WorldWideScience

Sample records for admission management system

  1. Admission Control Techniques for UMTS System

    Directory of Open Access Journals (Sweden)

    P. Kejik

    2010-09-01

    Full Text Available Universal mobile telecommunications system (UMTS is one of the 3rd generation (3G cell phone technologies. The capacity of UMTS is interference limited. Radio resources management (RRM functions are therefore used. They are responsible for supplying optimum coverage, ensuring efficient use of physical resources, and providing the maximum planned capacity. This paper deals with admission control techniques for UMTS. An own UMTS simulation program and several versions of proposed admission control algorithms are presented in this paper. These algorithms are based on fuzzy logic and genetic algorithms. The performance of algorithms is verified via simulations.

  2. Professional perspectives on systemic barriers to admission avoidance: learning from a system dynamics study of older people's admission pathways.

    Science.gov (United States)

    Walsh, Bronagh; Lattimer, Valerie; Wintrup, Julie; Brailsford, Sally

    2015-06-01

    There is debate worldwide about the best way to manage increased healthcare demand within ageing populations, particularly rising rates of unplanned and avoidable hospital admissions. To understand health and social care professionals' perspectives on barriers to admission avoidance throughout the admissions journey, in particular: the causes of avoidable admissions in older people; drivers of admission and barriers to use of admission avoidance strategies; and improvements to reduce unnecessary admissions. A qualitative framework analysis of interview data from a System dynamics (SD) modelling study. Semi-structured interviews were conducted with twenty health and social care professionals with experience of older people's admissions. The interviews were used to build understanding of factors facilitating or hindering admission avoidance across the admissions system. Data were analysed using framework analysis. Three overarching themes emerged: understanding the needs of the patient group; understanding the whole system; and systemwide access to expertise in care of older people. There were diverse views on the underlying reasons for avoidable admissions and recognition of the need for whole-system approaches to service redesign. Participants recommended system redesign that recognises the specific needs of older people, but there was no consensus on underlying patient needs or specific service developments. Access to expertise in management of older and frailer patients was seen as a barrier to admission avoidance throughout the system. Providing access to expertise and leadership in care of frail older people across the admissions system presents a challenge for service managers and nurse educators but is seen as a prerequisite for effective admission avoidance. System redesign to meet the needs of frail older people requires agreement on causes of avoidable admission and underlying patient needs. © 2014 John Wiley & Sons Ltd.

  3. Evaluating the Predictive Validity of Graduate Management Admission Test Scores

    Science.gov (United States)

    Sireci, Stephen G.; Talento-Miller, Eileen

    2006-01-01

    Admissions data and first-year grade point average (GPA) data from 11 graduate management schools were analyzed to evaluate the predictive validity of Graduate Management Admission Test[R] (GMAT[R]) scores and the extent to which predictive validity held across sex and race/ethnicity. The results indicated GMAT verbal and quantitative scores had…

  4. Resource management in Diffserv measurement-based admission control PHR

    NARCIS (Netherlands)

    Westberg, L.; Heijenk, Geert; Karagiannis, Georgios; Oosthoek, S.; Partain, D.; Rexhepi, Vlora; Szabo, R.; Wallentin, P.; El Allali, H.

    2002-01-01

    The purpose of this draft is to present the Resource Management in Diffserv (RMD) Measurement-Based Admission Control (RIMA) Per Hop Reservation (PHR) protocol. The RIMA PHR protocol is used on a per-hop basis in a Differentiated Services (Diffserv) domain and extends the Diffserv Per Hop Behavior

  5. Admission, management and outcomes of acute pancreatitis in intensive care.

    Science.gov (United States)

    Russell, Peter S; Mittal, Anhubav; Brown, Lisa; McArthur, Colin; Phillips, Anthony J R; Petrov, Max; Windsor, John A

    2017-12-01

    A review of the management of acute pancreatitis (AP) at a tertiary intensive care unit (ICU) in Auckland, New Zealand, was published in 2004. This paper aims to update this series and identify changes in admission criteria, management and outcomes. A retrospective review of patients admitted to the Department of Critical Care Medicine, Auckland City Hospital, with AP from 2003 to 2014 was undertaken and data compared with the previous study (1988-2001). Eighty-four patients (male 53, mean ± SD age = 56.9 ± 15 years) with 85 admissions to ICU from 2003 to 2014 were compared with 112 patients in the previous study. Maori were over-represented. Median duration of symptoms prior to admission to ICU decreased from 7 to 3 days. The proportion of total AP patients admitted to ICU halved and the mean Acute Physiology and Chronic Health Evaluation II score on admission decreased from mean 19.9 ± 8.2 SD to 15.4 ± 7.3 (P < 0.001). Two thirds of patients had persistent organ failure. The use of enteral feeding doubled from 46/112 (41%) to 71/85 (84%) (P < 0.001). The use of primary percutaneous drainage increased from 14/112 (13%) to 24/85 (28%) (P = 0.007). Rate of necrosectomy was similar (36/112 (32%) versus 20/85 (24%), P = 0.205), although minimally invasive necrosectomy was introduced. Overall hospital mortality decreased by 29% (P = 0.198). There have been changes to the admission criteria and management in line with evolving guidelines and, overall, outcomes have improved. © 2016 Royal Australasian College of Surgeons.

  6. Admission Control and Interference Management in Dynamic Spectrum Access Networks

    Directory of Open Access Journals (Sweden)

    Jorge Martinez-Bauset

    2010-01-01

    Full Text Available We study two important aspects to make dynamic spectrum access work in practice: the admission policy of secondary users (SUs to achieve a certain degree of quality of service and the management of the interference caused by SUs to primary users (PUs. In order to limit the forced termination probability of SUs, we evaluate the Fractional Guard Channel reservation scheme to give priority to spectrum handovers over new arrivals. We show that, contrary to what has been proposed, the throughput of SUs cannot be maximized by configuring the reservation parameter. We also study the interference caused by SUs to PUs. We propose and evaluate different mechanisms to reduce the interference, which are based on simple spectrum access algorithms for both PUs and SUs and channel repacking algorithms for SUs. Numerical results show that the reduction can be of one order of magnitude or more with respect to the random access case. Finally, we propose an adaptive admission control scheme that is able to limit simultaneously the forced termination probability of SUs and what we define as the probability of interference. Our scheme does not require any configuration parameters beyond the probability objectives. Besides, it is simple to implement and it can operate with any arrival process and distribution of the session duration.

  7. Power Admission Control with Predictive Thermal Management in Smart Buildings

    DEFF Research Database (Denmark)

    Yao, Jianguo; Costanzo, Giuseppe Tommaso; Zhu, Guchuan

    2015-01-01

    This paper presents a control scheme for thermal management in smart buildings based on predictive power admission control. This approach combines model predictive control with budget-schedulability analysis in order to reduce peak power consumption as well as ensure thermal comfort. First......, the power budget with a given thermal comfort constraint is optimized through budget-schedulability analysis which amounts to solving a constrained linear programming problem. Second, the effective peak power demand is reduced by means of the optimal scheduling and cooperative operation of multiple thermal...... appliances. The performance of the proposed control scheme is assessed by simulation based on the thermal dynamics of a real eight-room office building located at Danish Technical University....

  8. Using Lean Management to Reduce Emergency Department Length of Stay for Medicine Admissions.

    Science.gov (United States)

    Allaudeen, Nazima; Vashi, Anita; Breckenridge, Julia S; Haji-Sheikhi, Farnoosh; Wagner, Sarah; Posley, Keith A; Asch, Steven M

    The practice of boarding admitted patients in the emergency department (ED) carries negative operational, clinical, and patient satisfaction consequences. Lean tools have been used to improve ED workflow. Interventions focused on reducing ED length of stay (LOS) for admitted patients are less explored. To evaluate a Lean-based initiative to reduce ED LOS for medicine admissions. Prospective quality improvement initiative performed at a single university-affiliated Department of Veterans Affairs (VA) medical center from February 2013 to February 2016. We performed a Lean-based multidisciplinary initiative beginning with a rapid process improvement workshop to evaluate current processes, identify root causes of delays, and develop countermeasures. Frontline staff developed standard work for each phase of the ED stay. Units developed a daily management system to reinforce, evaluate, and refine standard work. The primary outcome was the change in ED LOS for medicine admissions pre- and postintervention. ED LOS at the intervention site was compared with other similar VA facilities as controls over the same time period using a difference-in-differences approach. ED LOS for medicine admissions reduced 26.4%, from 8.7 to 6.4 hours. Difference-in-differences analysis showed that ED LOS for combined medicine and surgical admissions decreased from 6.7 to 6.0 hours (-0.7 hours, P = .003) at the intervention site compared with no change (5.6 hours, P = .2) at the control sites. We utilized Lean management to significantly reduce ED LOS for medicine admissions. Specifically, the development and management of standard work were key to sustaining these results.

  9. Validation of the MARS (Medical Admission Risk System)

    DEFF Research Database (Denmark)

    Ohman, Malin Charlotta; Atkins, Tara E Holm; Cooksley, Tim

    2018-01-01

    Background: The MARS (Medical Admission Risk System) uses 11 physiological and laboratory data and had promising results in its derivation study for predicting 5 and 7 day mortality. Aim: To perform an external independent validation of the MARS score. Design: An unplanned secondary cohort study....

  10. Surgical management of colonic volvulus during same hospital admission

    International Nuclear Information System (INIS)

    Alam, Mohammed K.; Fahim, F.; Qazi, Shabir A.; Al-Akeely, Mohammad H.A.; Al-Dossary, Nasser F.

    2009-01-01

    Objective was to study the local patient profile, diagnostic methods and treatment outcome in patients with large bowel volvulus to recommend a management plan. A retrospective study of patient's record with a final diagnosis of large bowel volvulus treated at King Saud Medical Complex, Riyadh, Saudi Arabia between January 2000 and December 2007 were performed for patient demography, clinical presentations, co-morbidity, diagnostic methods, anatomical types, management and outcome. Forty-two patients with large bowel volvulus were reviewed. They presented 8.5% of all intestinal obstructions treated. Most had sigmoid volvulus (83%), were less than 60 years of age and were male. Recognized risk factors were present in 12 (29%) patients. Diagnosis was suspected on plain abdominal x-ray in 28 patients (69%), although the characteristic signs of omega and coffee bean were seen only in 16 patients. Eight patients required emergency surgery. Endoscopic decompression was successful in 34 patients, followed by a definitive surgery in 24 patients. Seven patients refused surgery; 3 of them were readmitted with recurrence and were operated. Three patients were unfit for surgery. There were 3 deaths. Large bowel volvulus is uncommon in this area. Abdominal distension with pain, constipation and characteristic gas pattern in plain x-ray can help diagnose most cases. Decompression can be achieved in most patients with sigmoid volvulus, followed by surgery during the same hospital admission. Transverse colon and cecal volvulus usually need emergency surgery. (author)

  11. Management of thallium poisoning in patients with delayed hospital admission.

    Science.gov (United States)

    Sun, Tong-Wen; Xu, Qing-Yan; Zhang, Xiao-Juan; Wu, Qiong; Liu, Zhang-Suo; Kan, Quan-Cheng; Sun, Cheng-Ye; Wang, Lexin

    2012-01-01

    To describe the clinical features and management of thallium poisoning in patients with delayed hospital admission. Fourteen patients (median age 36 years) were admitted 9-19 days after ingesting food poisoned with thallium. Clinical and laboratory data, including blood and urine thallium concentrations, were collected. Patients were treated with oral Prussian blue, a chelating agent sodium dimercaptosulfonate, and hemodialysis. All patients experienced a triad of symptoms of acute gastrointestinal upset, painful combined polyneuropathy, and hair loss after consuming poisoned food. Fatigue and skin pigmentation were observed in all patients. Abnormal liver function tests were found in 6 (42.9%) and delirium and coma were identified in 4 (28.6%). Two weeks after the poisoning, the blood and urine thallium concentration ranged from 219.0 to 1414.4 μg/L (median: 535.3) and 956.5 to 11285.0 μg/L (median: 7460.0), respectively. One patient (7.1%) with a previous history of pulmonary fibrosis died of respiratory failure in hospital. Symptoms were improved and blood or urine thallium levels were normalized in the remaining 13 patients before discharge. After a 6.5 ± 1-month follow-up, 1 patient (7.1%) developed deep venous thrombosis in the left lower limb. In another patient (7.1%), numbness in the lower limbs remained. Acute thallium poisoning is commonly manifested by gastrointestinal upset, painful polyneuropathy, and significant hair loss. Treatment strategies included Prussian blue and hemodialysis, which were associated with a good outcome in this case series.

  12. A multidisciplinary team case management approach reduces the burden of frequent asthma admissions.

    Science.gov (United States)

    Burke, Hannah; Davis, Jenny; Evans, Sian; Flower, Laura; Tan, Andrew; Kurukulaaratchy, Ramesh J

    2016-07-01

    Up to 10% of asthmatics have "difficult asthma"; however, they account for 80% of asthma-related expenditure and run the highest risk of acute severe exacerbations. An estimated 75% of admissions for asthma are avoidable. Guidelines advise that these patients be managed by an experienced specialist multidisciplinary team (MDT). We aimed to assess the impact of a case management strategy delivered via specialist MDTs on acute healthcare utilisation of patients with frequent asthma admissions. An MDT (consultant, specialist nurse, physiotherapist and psychologist) case management strategy was introduced in 2010 at University Hospital Southampton Foundation Trust (Southampton, UK) to support patients with frequent asthma admissions during admission and then in clinic. To assess efficacy, we systematically searched the hospital database for patients acutely admitted for asthma on two or more occasions in 2010, 2011 and 2012. Data were collected retrospectively covering patient demographics, admission details, asthma severity and comorbidity. From 2010 to 2012, 84 patients were admitted on two or more occasions per year (80% female, mean body mass index 31 kg·m -2 and 55% psychological comorbidity). After introducing an MDT approach repeat asthma admissions fell by 33% from 127 in 2010 to 84 in 2012 (p=0.0004). In addition, bed days fell by 52% from 895 in 2010 to 430 in 2010 (p=0.015). An MDT case management approach significantly reduces hospitalisation in difficult asthma patients with prior frequent admission.

  13. Admissible perturbations and false instabilities in PT -symmetric quantum systems

    Science.gov (United States)

    Znojil, Miloslav

    2018-03-01

    One of the most characteristic mathematical features of the PT -symmetric quantum mechanics is the explicit Hamiltonian dependence of its physical Hilbert space of states H =H (H ) . Some of the most important physical consequences are discussed, with emphasis on the dynamical regime in which the system is close to phase transition. Consistent perturbation treatment of such a regime is proposed. An illustrative application of the innovated perturbation theory to a non-Hermitian but PT -symmetric user-friendly family of J -parametric "discrete anharmonic" quantum Hamiltonians H =H (λ ⃗) is provided. The models are shown to admit the standard probabilistic interpretation if and only if the parameters remain compatible with the reality of the spectrum, λ ⃗∈D(physical ) . In contradiction to conventional wisdom, the systems are then shown to be stable with respect to admissible perturbations, inside the domain D(physical ), even in the immediate vicinity of the phase-transition boundaries ∂ D(physical ) .

  14. Effect of Medicaid disease management programs on emergency admissions and inpatient costs.

    Science.gov (United States)

    Conti, Matthew S

    2013-08-01

    To determine the impact of state Medicaid diabetes disease management programs on emergency admissions and inpatient costs. National InPatient Sample sponsored by the Agency for Healthcare Research and Quality Project for the years from 2000 to 2008 using 18 states. A difference-in-difference methodology compares costs and number of emergency admissions for Washington, Texas, and Georgia, which implemented disease management programs between 2000 and 2008, to states that did not undergo the transition to managed care (N = 103). Costs and emergency admissions were extracted for diabetic Medicaid enrollees diagnosed in the reform and non-reform states and collapsed into state and year cells. In the three treatment states, the implementation of disease management programs did not have statistically significant impacts on the outcome variables when compared to the control states. States that implemented disease management programs did not achieve improvements in costs or the number of emergency of admissions; thus, these programs do not appear to be an effective way to reduce the burden of this chronic disease. © Health Research and Educational Trust.

  15. Admission uric acid levels and length of expectant management in preterm preeclampsia.

    Science.gov (United States)

    Urato, A C; Bond, B; Craigo, S D; Norwitz, E R; Paulus, J K; Strohsnitter, W C

    2012-10-01

    Uric acid is known to be elevated in preeclampsia. We sought to determine if uric acid levels on admission correlate with the length of expectant management in preterm patients with preeclampsia. A retrospective chart review was conducted on singleton preeclamptic pregnancies delivered between 24 0/7 and 37 0/7 weeks' gestation at Tufts Medical Center between January 2005 and December 2007. Patients with a multiple gestation and those transferred or discharged before delivery were excluded. Data regarding signs and symptoms of preeclampsia, laboratory values, pregnancy complications and outcome were abstracted from the medical records. Correlation between admission uric acid level and days of expectant management was assessed. The relative risk (RR) was used to estimate the effect of uric acid levels on expectant management length >7 days. Mantel-Haenszel χ(2) values were used to construct 95% confidence intervals (CIs) around the RR. Four hundred seventy-one charts were reviewed. Of these, 190 met inclusion criteria. In all, 55 patients (28.9%) were managed expectantly for >1 week. Admission uric acid level correlated with days of expectant management (Pmanagement for >1 week among women with low uric acid level (7.0; 95% CI: 3.34 to 14.68). Women with medium uric acid levels at admission also had a higher likelihood of prolonging pregnancy relative to women with high uric acid levels (RR: 2.81; 95% CI: 1.32 to 5.96) (P-value for trend management in preterm patients with preeclampsia. Pregnancy prolongation for >1 week is significantly more likely in patients with low and medium uric acid levels at the time of admission. Uric acid levels may be helpful in assessing disease severity and counseling preeclamptic patients regarding likelihood of extended expectant management.

  16. Reliable Record Matching for a College Admissions System.

    Science.gov (United States)

    Fitt, Paul D.

    Prospective student data, supplied by various national college testing and student search services, can be matched with existing student records in a college admissions database. Instead of relying on one unique record identifier, such as the student's social security number, a technique has been developed that is based on a number of common data…

  17. What is the evidence for the management of patients along the pathway from the emergency department to acute admission to reduce unplanned attendance and admission? An evidence synthesis.

    Science.gov (United States)

    Credé, Sarah H; O'Keeffe, Colin; Mason, Suzanne; Sutton, Anthea; Howe, Emma; Croft, Susan J; Whiteside, Mike

    2017-05-16

    Globally, the rate of emergency hospital admissions is increasing. However, little evidence exists to inform the development of interventions to reduce unplanned Emergency Department (ED) attendances and hospital admissions. The objective of this evidence synthesis was to review the evidence for interventions, conducted during the patient's journey through the ED or acute care setting, to manage people with an exacerbation of a medical condition to reduce unplanned emergency hospital attendance and admissions. A rapid evidence synthesis, using a systematic literature search, was undertaken in the electronic data bases of MEDLINE, EMBASE, CINAHL, the Cochrane Library and Web of Science, for the years 2000-2014. Evidence included in this review was restricted to Randomised Controlled Trials (RCTs) and observational studies (with a control arm) reported in peer-reviewed journals. Studies evaluating interventions for patients with an acute exacerbation of a medical condition in the ED or acute care setting which reported at least one outcome related to ED attendance or unplanned admission were included. Thirty papers met our inclusion criteria: 19 intervention studies (14 RCTs) and 11 controlled observational studies. Sixteen studies were set in the ED and 14 were conducted in an acute setting. Two studies (one RCT), set in the ED were effective in reducing ED attendance and hospital admission. Both of these interventions were initiated in the ED and included a post-discharge community component. Paradoxically 3 ED initiated interventions showed an increase in ED re-attendance. Six studies (1 RCT) set in acute care settings were effective in reducing: hospital admission, ED re-attendance or re-admission (two in an observation ward, one in an ED assessment unit and three in which the intervention was conducted within 72 h of admission). There is no clear evidence that specific interventions along the patient journey from ED arrival to 72 h after admission benefit ED

  18. AN AUTOMATED IMPLEMENTATION OF INDIAN UNIVERSITY ADMISSION SYSTEM USING ARTIFICIAL NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    B. Sankarasubramanian

    2014-04-01

    Full Text Available Indian University Admission is a complex phenomenon encompassing various factors both tangible and intangible. Apart from Merit - Caste, Community and Religion play a crucial role in getting admission to various courses offered by Universities. The Single Window Admission System followed by almost all Government Universities (for example: Anna University, Chennai is, so far, the best practice to offer Admission sought by student community. But, still, in Private Universities, the Admission process is done manually since number of students seeking a course is smaller in size. This manual process is fraught with some drawbacks: such as slower in time, cumbersome and costlier, bias by the Admission Officer, manual errors while processing, due to influence exercised by powerful people qualified students not getting their course of choice and unqualified students getting into their course of willingness and etc. This paper addresses these problems via neural network architecture based Admission system which will eliminate all the pitfalls and drawbacks inherent in the current system and offers a smooth, clearer, easier and cost effective way of student admission system implementation in Indian Universities.

  19. Traffic Management by Using Admission Control Methods in Multiple Node IMS Network

    Directory of Open Access Journals (Sweden)

    Filip Chamraz

    2016-01-01

    Full Text Available The paper deals with Admission Control methods (AC as a possible solution for traffic management in IMS networks (IP Multimedia Subsystem - from the point of view of an efficient redistribution of the available network resources and keeping the parameters of Quality of Service (QoS. The paper specifically aims at the selection of the most appropriate method for the specific type of traffic and traffic management concept using AC methods on multiple nodes. The potential benefit and disadvantage of the used solution is evaluated.

  20. Enrollment Management in Medical School Admissions: A Novel Evidence-Based Approach at One Institution.

    Science.gov (United States)

    Burkhardt, John C; DesJardins, Stephen L; Teener, Carol A; Gay, Steven E; Santen, Sally A

    2016-11-01

    In higher education, enrollment management has been developed to accurately predict the likelihood of enrollment of admitted students. This allows evidence to dictate numbers of interviews scheduled, offers of admission, and financial aid package distribution. The applicability of enrollment management techniques for use in medical education was tested through creation of a predictive enrollment model at the University of Michigan Medical School (U-M). U-M and American Medical College Application Service data (2006-2014) were combined to create a database including applicant demographics, academic application scores, institutional financial aid offer, and choice of school attended. Binomial logistic regression and multinomial logistic regression models were estimated in order to study factors related to enrollment at the local institution versus elsewhere and to groupings of competing peer institutions. A predictive analytic "dashboard" was created for practical use. Both models were significant at P performance. In the binomial model female, underrepresented minority students, grade point average, Medical College Admission Test score, admissions committee desirability score, and most individual financial aid offers were significant (P performs a key institutional research function for understanding failed recruitment of highly desirable candidates.

  1. Functional Health Literacy and the Risk of Hospital Admission Among Medicare Managed Care Enrollees

    Science.gov (United States)

    Baker, David W.; Gazmararian, Julie A.; Williams, Mark V.; Scott, Tracy; Parker, Ruth M.; Green, Diane; Ren, Junling; Peel, Jennifer

    2002-01-01

    Objectives. This study analyzed whether inadequate functional health literacy is an independent risk factor for hospital admission. Methods. We studied a prospective cohort of 3260 Medicare managed care enrollees. Results. Of the participants, 29.5% were hospitalized. The crude relative risk (RR) of hospitalization was higher for individuals with inadequate literacy (n = 800; RR = 1.43; 95% confidence interval [CI] = 1.24, 1.65) and marginal literacy (n = 366; RR = 1.33; 95% CI = 1.09, 1.61) than for those with adequate literacy (n = 2094). In multivariate analysis, the adjusted relative risk of hospital admission was 1.29 (95% CI = 1.07, 1.55) for individuals with inadequate literacy and 1.21 (95% CI = 0.97, 1.50) for those with marginal literacy. Conclusions. Inadequate literacy was an independent risk factor for hospital admission among elderly managed care enrollees. (Am J Public Health. 2002;92:1278–1283) PMID:12144984

  2. Effectiveness of case management in the prevention of COPD re-admissions: a pilot study.

    Science.gov (United States)

    van Eeden, Annelies E; van de Poll, Ingrid; van Vulpen, Gertrud; Roldaan, Tim; Wagenaar, Wies; Boland, Melinde R S; Wolterbeek, Ron; Chavannes, Niels H

    2017-11-25

    Chronic obstructive pulmonary disease (COPD) exacerbations are associated with high disease burden and costs, especially in the case of hospitalizations. The overall number of hospital admissions due to exacerbations of COPD has increased. It is remarkable that re-admissions account for a substantial part of these hospitalizations. This pilot study investigates the use of case management to reduce re-admissions due to COPD. COPD patients with more than one hospitalization per year due to an exacerbation were included. The participants (n = 10) were closely monitored and intensively coached for 20 weeks after hospitalization. The case manager provided care in a person-focused manner. The case manager informed and supported the patient, took action when relapse threatened, coordinated and connected primary and secondary care. Data of 12 months before and after start of the intervention were compared. Primary outcome was the difference in number of hospitalizations. Secondary outcomes were health-related quality of life (measured by the Clinical COPD Questionnaire, CCQ) and dyspnoea (measured by the MRC Dyspnoea Scale). The incidence rate of hospitalizations was found to be 2.25 times higher (95% confidence interval [CI] 1.3-3.9; P = 0.004) 12 months before compared with 12 months after the start of case management. COPD patients had a mean CCQ score of 3.3 (95% CI 2.8-3.8) before and 2.4 (95% CI 1.9-2.8) after 20 weeks of case management; a difference of 1.0 (95% CI 0.4-1.6; P = 0.001). The mean MRC scores showed no significant differences before (4.3; 95% CI 3.7-4.9) and after the case management period (3.9; 95% CI 3.2-4.6); a difference of 0.4 (95% CI - 0.1 to 0.9; P = 0.114). This pilot study shows that the number of COPD hospital re-admissions decreased significantly after the introduction of a case manager. Moreover, there was an improvement in patient-reported health-related quality of life.

  3. Lumbar puncture for suspected meningitis after intensive care unit admission is likely to change management.

    Science.gov (United States)

    Khasawneh, Faisal A; Smalligan, Roger D; Mohamad, Tammam N; Moughrabieh, Mohamad K; Soubani, Ayman O

    2011-02-01

    The aim of this study was to determine the outcome of lumbar punctures (LPs) in critically ill medical patients and how likely the results were to change case management. A retrospective review was conducted on the medical records of all 168 patients who underwent LP during their medical intensive care unit (MICU) admission at a university hospital during a 4.5-year period beginning in January 2000. Lumbar puncture was performed a mean of 2.8 days after MICU admission. The most common symptoms that prompted LP were changes in mental status and fever. Seventy-four percent of patients were on antibiotics at the time of LP, and 98% of patients had a computed tomography scan of the head performed before the procedure. Lumbar puncture confirmed meningitis in 47 (30%) patients and provided a specific bacteriologic diagnosis in 5 (3%) patients. The results of the procedure led to a change in management in 50 (30%) patients. The presence of meningeal signs and use of antibiotics at the time of the procedure were the factors that predicted change in management. Although the likelihood that LP will yield a specific bacteriologic diagnosis in critically ill patients is low, the procedure frequently provides important information that can lead to a change in case management, most commonly de-escalation of antibiotic therapy.

  4. Multi-Stage Admission Control for Load Balancing in Next Generation Systems

    DEFF Research Database (Denmark)

    Mihovska, Albena D.; Anggorojati, Bayu; Luo, Jijun

    2008-01-01

    This paper describes a load-dependent multi-stage admission control suitable for next generation systems. The concept uses decision polling in entities located at different levels of the architecture hierarchy and based on the load to activate a sequence of actions related to the admission...... of a user to the network, i.e., the ranking of the intermediate decisions is dynamic. The decision is controlled by passing a token between the base station (BS) and the gateway (GW), thereby considering the load status of the BS and the backhaul network. A token is assigned to the entity with the highest...... load. Each admission request will issue a flag whose colour will reflect the load level in this entity and will determine the correct sequence of the required admission control actions....

  5. Association between use of a health information exchange system and hospital admissions.

    Science.gov (United States)

    Vest, J R; Kern, L M; Campion, T R; Silver, M D; Kaushal, R

    2014-01-01

    Relevant patient information is frequently difficult to obtain in emergency department (ED) visits. Improved provider access to previously inaccessible patient information may improve the quality of care and reduce hospital admissions. Health information exchange (HIE) systems enable access to longitudinal, community-wide patient information at the point of care. However, the ability of HIE to avert admissions is not well demonstrated. We sought to determine if HIE system usage is correlated with a reduction in admissions via the ED. We identified 15,645 adults from New York State with an ED visit during a 6-month period, all of whom consented to have their information accessible in the HIE system, and were continuously enrolled in two area health plans. Using claims we determined if the ED encounter resulted in an admission. We used the HIE's system log files to determine usage during the encounter. We determined the association between HIE system use and the likelihood of admission to the hospital from the ED and potential cost savings. The HIE system was accessed during 2.4% of encounters. The odds of an admission were 30% lower when the system was accessed after controlling for confounding (odds ratio = 0.70; 95%C I= 0.52, 0.95). The annual savings in the sample was $357,000. These findings suggest that the use of an HIE system may reduce hospitalizations from the ED with resultant cost savings. This is an important outcome given the substantial financial investment in interventions designed to improve provider access to patient information in the US.

  6. Design of a fuzzy ranking system for admission processes in higher ...

    African Journals Online (AJOL)

    ... was used to evaluate candidates' credentials and every other determinant factor for admitting students. The results showed each candidate's chances of admission, while the system minimized the level of subjectivity in decision making. Keywords: Fuzzy logic, artificial intelligence, decision making, fuzzy inference system ...

  7. Relationships of Multimorbidity and Income With Hospital Admissions in 3 Health Care Systems

    OpenAIRE

    Wang, Harry H. X.; Wang, Jia Ji; Lawson, Kenny D.; Wong, Samuel Y. S.; Wong, Martin C. S.; Li, Fang Jian; Wang, Pei Xi; Zhou, Zhi Heng; Zhu, Chun Yan; Yeong, Yao Qun; Griffiths, Sian M.; Mercer, Stewart W.

    2015-01-01

    Associations of multimorbidity and income with hospital admission were investigated in population samples from 3 widely differing health care systems: Scotland (n = 36,921), China (n = 162,464), and Hong Kong (n = 29,187). Multimorbidity increased odds of admissions in all 3 settings. In Scotland, poorer people were more likely to be admitted (adjusted odds ratio [aOR] = 1.62; 95% CI, 1.41–1.86 for the lowest income group vs the highest), whereas China showed the opposite (aOR ...

  8. Social networks enabled coordination model for cost management of patient hospital admissions.

    Science.gov (United States)

    Uddin, Mohammed Shahadat; Hossain, Liaquat

    2011-09-01

    In this study, we introduce a social networks enabled coordination model for exploring the effect of network position of "patient," "physician," and "hospital" actors in a patient-centered care network that evolves during patient hospitalization period on the total cost of coordination. An actor is a node, which represents an entity such as individual and organization in a social network. In our analysis of actor networks and coordination in the healthcare literature, we identified that there is significant gap where a number of promising hospital coordination model have been developed (e.g., Guided Care Model, Chronic Care Model) for the current healthcare system focusing on quality of service and patient satisfaction. The health insurance dataset for total hip replacement (THR) from hospital contribution fund, a prominent Australian Health Insurance Company, are analyzed to examine our proposed coordination model. We consider network attributes of degree, connectedness, in-degree, out-degree, and tie strength to measure network position of actors. To measure the cost of coordination for a particular hospital, average of total hospitalization expenses for all THR hospital admissions is used. Results show that network positions of "patient," "physician," and "hospital" actors considering all hospital admissions that a particular hospital has have effect on the average of total hospitalization expenses of that hospital. These results can be used as guidelines to set up a cost-effective healthcare practice structure for patient hospitalization expenses. © 2011 National Association for Healthcare Quality.

  9. Prescription and over-the-counter drug treatment admissions to the California public treatment system.

    Science.gov (United States)

    Gonzales, Rachel; Brecht, Mary-Lynn; Mooney, Larissa; Rawson, Richard A

    2011-04-01

    Prescription and over-the-counter (OTC) drug abuse has become a focal point of public health policy, prevention, and control efforts. Adolescents represent one of the fastest growing segments of the general population abusing prescription and OTC drugs as represented by national surveys. This article reports on treatment admission data to the California addiction public system for prescription and OTC drugs among two age subgroups: adolescents 12-17 years and adults 18 years and older. Of the 6,841 admissions for primary abuse of prescription and OTC drugs in California (during 2006-2007), most adolescent admissions (12-17) were for stimulant prescription and OTC drugs (45.3% and 32.1%, respectively), whereas opioid prescription drugs (88.9%) were most common for adults 18 years and older. Differences in psychosocial, treatment, and substance use characteristics between these two age subgroups are described. Results from this study offer useful treatment admission information about prescription and OTC drug abuse within the California public addiction treatment system. Published by Elsevier Inc.

  10. A Reinforcement Learning Approach to Call Admission Control in HAPS Communication System

    Directory of Open Access Journals (Sweden)

    Ni Shu Yan

    2017-01-01

    Full Text Available The large changing of link capacity and number of users caused by the movement of both platform and users in communication system based on high altitude platform station (HAPS will resulting in high dropping rate of handover and reduce resource utilization. In order to solve these problems, this paper proposes an adaptive call admission control strategy based on reinforcement learning approach. The goal of this strategy is to maximize long-term gains of system, with the introduction of cross-layer interaction and the service downgraded. In order to access different traffics adaptively, the access utility of handover traffics and new call traffics is designed in different state of communication system. Numerical simulation result shows that the proposed call admission control strategy can enhance bandwidth resource utilization and the performances of handover traffics.

  11. Cost of management in epistaxis admission: Impact of patient and hospital characteristics.

    Science.gov (United States)

    Goljo, Erden; Dang, Rajan; Iloreta, Alfred M; Govindaraj, Satish

    2015-12-01

    To investigate patient and hospital characteristics associated with increased cost and length of stay in the inpatient management of epistaxis. Retrospective cross-sectional study of the 2008 to 2012 National (Nationwide) Inpatient Sample. Patient and hospital characteristics of epistaxis admissions were analyzed. Multiple linear regression analysis was used to ascertain variables associated with increased cost and length of hospital stay. Variables significantly associated with high cost were further analyzed to determine the contribution of operative intervention and total procedures to cost. A total of 16,828 patients with an admitting diagnosis of epistaxis were identified. The average age was 67.5; 52.3% of the patients were male; 73.3% of the patients were Caucasian; and 70.7% of the hospital stays were government funded. The average length of stay was 3.24 days, and average hospitalization cost was $6,925. Longer length of stay was associated with black race, alcohol abuse, sinonasal disease, renal disease, Medicaid, and care at a northeastern U.S. hospital. Increased hospitalization costs of > $1,000 were associated with Asian/Pacific Islander race; sinonasal disease; renal disease; top income quartile; and care at urban teaching, northeastern, and western hospitals in the United States. High costs were predicted by procedural intervention in patients with comorbid alcohol abuse, sinonasal disease, renal disease, patients with private insurance, and patients managed at large hospitals. Although hospitalization costs are complex and multifactorial, we were able to identify patient and hospital characteristics associated with high costs in the management of epistaxis. Early identification and intervention, combined with implementation of targeted hospital management protocols, may improve outcomes and reduce financial burden. 2C. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  12. The Validity of Graduate Management Admission Test Scores: A Summary of Studies Conducted from 1997 to 2004

    Science.gov (United States)

    Talento-Miller, Eileen; Rudner, Lawrence M.

    2008-01-01

    The validity of Graduate Management Admission Test (GMAT) scores is examined by summarizing 273 studies conducted between 1997 and 2004. Each of the studies was conducted through the Validity Study Service of the test sponsor and contained identical variables and statistical methods. Validity coefficients from each of the studies were corrected…

  13. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  14. A review of pre-admission advanced airway management in combat casualties, Helmand Province 2013.

    Science.gov (United States)

    Pugh, Harry E J; LeClerc, S; Mclennan, J

    2015-06-01

    Airway compromise is the third leading cause of potentially preventable combat death. Pre-hospital airway management has lower success rates than in hospital. This study reviewed advanced airway management focusing on cricothyroidotomies and supraglottic airway devices in combat casualties prior to admission to a Role 3 Hospital in Afghanistan. This was a retrospective review of all casualties who required advanced airway management prior to arrival at the Role 3 Hospital, Bastion, Helmand Province over a 30-week period identified by the US Joint Theatre Trauma Registry. The notes and relevant X-rays were analysed. The opinions of US and UK clinical Subject Matter Experts (SME) were then sought. Fifty-seven advanced airway interventions were identified. 45 casualties had attempted intubations, 37 (82%) were successful and of those who had failed intubations, one had a King LT Airway (supraglottic device) and seven had a rescue cricothyroidotomy. The other initial advanced airway interventions were five attempted King LT airways and seven attempted cricothyroidotomies. In total, 14 cricothyroidotomies were performed; in this group, there were nine complications/significant events. The SMEs suggested that dedicated surgical airway kits should be used and students in training should be taught to secure the cricothyroidotomy tube as well as how to insert it. This review re-emphasises the need to 'ensure the right person, with the right equipment and the right training, is present at the right time if we are to improve the survival of patients with airway compromise on the battlefield'. The audit reference number is RCDM/Res/Audit/1036/12/0368. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  15. Prevention of unplanned intensive care unit admissions and hospital mortality by early warning systems.

    Science.gov (United States)

    Mapp, Ila D; Davis, Leslie L; Krowchuk, Heidi

    2013-01-01

    Researchers have found that patients exhibit physiological changes up to 8 hours prior to an arrest event. Deaths have been attributed to a lack of observation, lack of documentation of observations, inability of a caregiver to recognize early signs of deterioration, and lack of communication between healthcare providers. This integrative review examines early warning scoring systems and their effectiveness in predicting a patient's potential for deterioration and considers whether these scoring systems prevent unplanned intensive care unit admissions and/or death. Three databases (MEDLINE, CINAHL [Cumulative Index to Nursing and Allied Health Literature], and the Cochrane Collaboration) were searched to identify the instruments and clinical support systems available to assist healthcare personnel in recognizing early clinical deterioration. Key search words included modified early warning score, early warning score, early warning systems, deteriorating patient, patients at risk, shock index, track and trigger systems, and failure to rescue. Two prior literature reviews examined early warning scoring systems and their effects on patient outcomes; however, the most recent one reviewed only articles published before 2007. This review examined studies of early warning systems and the incorporation of clinical support published from 2007 to 2012. Nine studies fitting the search criteria were included in this review. Early warning scoring systems that interface with electronic medical records and are supplemented with decision aides (algorithms) and clinical support systems produce an effective screening system for early identification of deteriorating patients. This multifaceted approach decreases unplanned intensive care unit admissions and hospital mortality.

  16. Evaluation of illness severity scoring systems and risk prediction in vascular intensive care admissions.

    Science.gov (United States)

    Dover, M; Tawfick, Wael; Hynes, Niamh; Sultan, Sherif

    2016-08-01

    This study examines the predictive value of intensive care unit (ICU) scoring systems in a vascular ICU population. From April 2005 to September 2011, we examined 363 consecutive ICU admissions. Simplified Acute Physiology Score II (SAPS II), Acute Physiology and Chronic Health Evaluation II (APACHE II), APACHE IV, Multiple Organ Dysfunction Score (MODS), organ dysfunctions and/or infection (ODIN), mortality prediction model (MPM) and physiologic and operative severity score for the enumeration of mortality and morbidity (POSSUM) were calculated. The Glasgow Aneurysm Score (GAS) was calculated for patients with aneurysm-related admissions. Overall mortality for complex vascular intervention was 11.6%. At admission, the areas under the receiver operating characteristic curve (AUCs) was 0.884 for SAPS II, 0.894 for APACHE II, 0.895 for APACHE IV, 0.902 for MODS, 0.891 for ODIN and 0.903 for MPM. At 24 h, model discrimination was best for POSSUM (AUC = 0.906) and MPM (AUC = 0.912). The good discrimination of these scoring systems indicates their value as an adjunct to clinical assessment but should not be used on an individual basis as a clinical decision-making tool. © The Author(s) 2015.

  17. Facebook Usage as Social Screening. Exploring the Approach of Admissions Officers from Management Colleges

    Directory of Open Access Journals (Sweden)

    Elena - Mădălina VĂTĂMĂNESCU

    2015-03-01

    Full Text Available The online social networks allow individuals to continuously create and model their self-presentations and representations. Facebook stands for a relevant example as people are given the uncensored opportunity to unfold their online selves according to their interests, preferences, goals and expectations. As a social networking site, Facebook is particularly used for reasons related to social documentation (social searching and maintaining preexisting close relationships (bonding social capital that imply knowledge of new information about persons met offline, and less for social exploration (social browsing that refers to using Facebook to initiate new contacts. The extant recent literature often approach the usage of Facebook as a pre-employment screening tool with a view to select the fittest candidates for the job. Still, there are few studies which address the professors’ endeavor to use social media, in general and Facebook, in particular, as a complementary criterion when selecting future students. At this level, Facebook profiles are liable to stand for cogent indicators for the prospects’ personalities and potential, for their predispositions and professional perspectives. Starting from this point, the current research aims at investigating the approaches on the aforementioned issue of several professors from Management colleges in Romania who are in charge of settling the evaluation reference points of the college admissions procedure. The research is the more relevant so as the future graduate managers should possess some key characteristics which may be anticipated or pre-assessed based on their Facebook profile cues. In order to test the subjects’ openness to consider the implications of Facebook usage as a thorough social documentation tool, nineteen in-depth interviews were conducted. The findings show that there is a high degree of skepticism towards using Facebook as a source of reliable information.

  18. Disproportionate effect on child admissions of the change in Medicines and Healthcare Products Regulatory Agency guidance for management of paracetamol poisoning: an analysis of hospital admissions for paracetamol overdose in England and Scotland.

    Science.gov (United States)

    Narayan, Hafid; Thomas, Simon H L; Eddleston, Michael; Dear, James W; Sandilands, Euan; Bateman, D Nicholas

    2015-12-01

    The aim of the present study was to assess the effects of the changes in the management of paracetamol overdose recommended by the UK Commission for Human Medicines on rates of hospital admission. An interrupted time series analysis was carried out on data for hospital admissions for paracetamol poisoning for England between January 2010 and June 2014, and for Scotland between January 2010 and Sept. 2014. The main outcome measure was admissions to hospital with paracetamol poisoning (T39.1), as defined by first position coding in children and adults. The time series analysis (Jan 2010 to June 2014) showed that admission rates for paracetamol poisoning were steady from 2010 to the date of change (September 2012), with an estimated 269 [95% confidence interval (CI) 252.5, 285.5] child (0-14 years) and 3541 (95% CI 3454, 3628) adult admissions per month. In September 2013, 12 months after the change, there were an estimated additional 116 [37.3% (95% CI 17.2-67.4)] child and 426 [12.5% (95% CI 4.5-19.6)] adult admissions. Thus, in the year before the change (September 2011 to August 2012) there were 45,181 (3500 child and 41,681 adult) admissions, and in the year after (September 2012 to August 2013) there were 50,198 (4779 child and 45,419 adult) admissions. The overall proportion of child admissions was significantly greater after the change (Chi-square 32.486, P paracetamol poisoning in September 2012 were rapidly implemented but have particularly increased paediatric hospital admissions for paracetamol poisoning. This impact in children, who are at low risk of mortality from paracetamol toxicity, appears excessive. © 2015 The British Pharmacological Society.

  19. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way.......In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  20. On the use of Disease Staging for clinical management: analysis of untimely admissions in the Abruzzo Region, Italy

    Directory of Open Access Journals (Sweden)

    Lamberto Manzoli

    2004-12-01

    Full Text Available

    Background and aims. The process of decentralization which recently occurred within the Italian National Health Service has transferred substantial responsibility and authority for health care administration to the individual regions. The project is aimed at developing regional benchmarks that can be used as a part of an ongoing system for analysis of resource use and quality of care in the Abruzzo Region of Italy.

    Methods. All 286 924 hospital admissions for the year 2001 in the region were analysed. Three diseases were chosen for in-depth review: diabetes mellitus; cholecystitis/cholelithiasis; and bacterial pneumonia. There were a total of 9391 admissions for these diagnoses. Severity, length of hospital stay and hospital mortality were analysed using Disease Staging methodology. In addition, the timeliness of hospitalisation was assessed by grouping admissions in three categories: premature or medically unnecessary, timely and late.

    Results. The rate of medically unnecessary admissions for diabetes mellitus was 72% throughout the region, and the percentage of late hospitalisations for cholelithiasis/cholecystitis was 43%. For both diseases, there were significant variations across Local Health Units in the proportion of late and early admissions. The rate of timely hospitalisations for bacterial pneumonia was higher than 86%.

    Conclusion. The analysis of discharge abstract data using Disease Staging revealed that in the Abruzzo region there are problems of inappropriate hospital admission, both early and late, for all diseases examined excepted bacterial pneumonia.

    Data confirmed the validity of Disease Staging to compare the performance of diverse hospitals in terms of length of stay and in-hospital mortality.

  1. Validating the Performance of the Modified Early Obstetric Warning System Multivariable Model to Predict Maternal Intensive Care Unit Admission.

    Science.gov (United States)

    Ryan, Helen M; Jones, Meghan A; Payne, Beth A; Sharma, Sumedha; Hutfield, Anna M; Lee, Tang; Ukah, U Vivian; Walley, Keith R; Magee, Laura A; von Dadelszen, Peter

    2017-09-01

    To evaluate the performance of the Modified Early Obstetric Warning System (MEOWS) to predict maternal ICU admission in an obstetric population. Case-control study. Two maternity units in Vancouver, Canada, one with ICU facilities, between January 1, 2000, and December 31, 2011. Pregnant or recently delivered (≤6 weeks) women admitted to the hospital for >24 hours. Three control patients were randomly selected per case and matched for year of admission. Retrospective, observational, case-control validation study investigating the physiologic predictors of admission in the 24-hour period preceding either ICU admission >24 hours (cases) or following admission (control patients). Model performance was assessed based on sensitivity, specificity, and predictive values. Forty-six women were admitted to the ICU for >24 hours (0.51/1000 deliveries); the study included 138 randomly selected control patients. There were no maternal deaths in the cohort. MEOWS had high sensitivity (0.96) but low specificity (0.54) for ICU admission >24 hours, whereas ≥1 one red trigger maintained sensitivity (0.96) and improved specificity (0.73). Altering MEOWS trigger parameters may improve the accuracy of MEOWS in predicting ICU admission. Formal modelling of a MEOWS scoring system is required to support evidence-based care. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  2. Transfer Innovations Fund Updating Project. BC Council on Admissions and Transfer. Tourism Management Articulation

    Science.gov (United States)

    British Columbia Council on Admissions and Transfer, 2010

    2010-01-01

    In 2008, a number of changes were identified that expanded the scope of the updating required for Block Transfer for tourism management as follows: a new core curriculum for diploma programs; the need for expanded information on diploma to diploma transfer; and, a growing need for an expanded system of transfer identified in Campus 2020…

  3. Relationships of multimorbidity and income with hospital admissions in 3 health care systems.

    Science.gov (United States)

    Wang, Harry H X; Wang, Jia Ji; Lawson, Kenny D; Wong, Samuel Y S; Wong, Martin C S; Li, Fang Jian; Wang, Pei Xi; Zhou, Zhi Heng; Zhu, Chun Yan; Yeong, Yao Qun; Griffiths, Sian M; Mercer, Stewart W

    2015-03-01

    Associations of multimorbidity and income with hospital admission were investigated in population samples from 3 widely differing health care systems: Scotland (n = 36,921), China (n = 162,464), and Hong Kong (n = 29,187). Multimorbidity increased odds of admissions in all 3 settings. In Scotland, poorer people were more likely to be admitted (adjusted odds ratio [aOR] = 1.62; 95% CI, 1.41-1.86 for the lowest income group vs the highest), whereas China showed the opposite (aOR = 0.58; 95% CI, 0.56-0.60). In Hong Kong, poorer people were more likely to be admitted to public hospitals (aOR = 1.68; 95% CI, 1.36-2.07), but less likely to be admitted to private ones (aOR = 0.18; 95% CI, 0.13-0.25). Strategies to improve equitable health care should consider the impact of socioeconomic deprivation on the use of health care resources, particularly among populations with prevalent multimorbidity. © 2015 Annals of Family Medicine, Inc.

  4. QoS-Guaranteed Admission Control for OFDMA-based Systems

    DEFF Research Database (Denmark)

    Ramkumar, Venkata; Anggorojati, Bayu; Lucian, Stefan P. Andrei

    2010-01-01

    This paper proposes a novel admission control (AC) algorithm for guaranteed quality of service (QoS) to all users. The proposed solution provides better utilization of system capacity using adaptive modulation (AM). A scheduler based on a per user priority function is also given in this paper....... The AC is given by allocating the exact number of slots for each user that will meet its QoS. For every new user the number of slots required to meet its service requirements is estimated based on its channel quality information (CQI), packet arrival rate and buffer length. Using the average QoS achieved......, the satisfaction index (SI) and priority is calculated for every user, which is used as key input for the scheduler. Further, the resource allocation in time and frequency for Orthogonal Frequency Division Multiplexing (OFDMA) systems is also discussed based on user satisfaction and number of slots required...

  5. 44 CFR 68.9 - Admissible evidence.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Admissible evidence. 68.9 Section 68.9 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... admissible. (b) Documentary and oral evidence shall be admissible. (c) Admissibility of non-expert testimony...

  6. Human Resource Management System

    OpenAIRE

    Navaz, A. S. Syed; Fiaz, A. S. Syed; Prabhadevi, C.; Sangeetha, V.; Gopalakrishnan, S.

    2013-01-01

    The paper titled HUMAN RESOURCE MANAGEMENT SYSTEM is basically concerned with managing the Administrator of HUMAN RESOURCE Department in a company. A Human Resource Management System, refers to the systems and processes at the intersection between human resource management and information technology. It merges HRM as a discipline and in particular its basic HR activities and processes with the information technology field, whereas the programming of data processing systems evolved into standa...

  7. Avionics System Performance Management

    National Research Council Canada - National Science Library

    Damania, Bhavesh

    1998-01-01

    .... The reasons for improved performance management include advances in processor technology and architectures, increasingly integrated systems, and the requirement of reducing costs in developing and deploying the systems...

  8. Credit Management System

    Data.gov (United States)

    US Agency for International Development — Credit Management System. Outsourced Internet-based application. CMS stores and processes data related to USAID credit programs. The system provides information...

  9. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  10. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  11. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  12. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  13. A new approach to scoring systems to improve identification of acute medical admissions that will require critical care.

    Science.gov (United States)

    Carmichael, H A; Robertson, E; Austin, J; McCruden, D; Messow, C M; Belcher, P R

    2011-11-01

    Removal of the intensive care unit (ICU) at the Vale of Leven Hospital mandated the identification and transfer out of those acute medical admissions with a high risk of requiring ICU. The aim of the study was to develop triaging tools that identified such patients and compare them with other scoring systems. The methodology included a retrospective analysis of physiological and arterial gas measurements from 1976 acute medical admissions produced PREEMPT-1 (PRE-critical Emergency Medical Patient Triage). A simpler one for ambulance use (PREAMBLE-1 [PRE-Admission Medical Blue-Light Emergency]) was produced by the addition of peripheral oxygen saturation to a modification of MEWS (Modified Early Warning Score). Prospective application of these tools produced a larger database of 4447 acute admissions from which logistic regression models produced PREEMPT-2 and PREAMBLE-2, which were then compared with the original systems and seven other early warning scoring systems. Results showed that in patients with arterial gases, the area under the receiver operator characteristic curve was significantly higher in PREEMPT-2 (89·1%) and PREAMBLE-2 (84.4%) than all other scoring systems. Similarly, in all patients, it was higher in PREAMBLE-2 (92·4%) than PREAMBLE-1 (88·1%) and the other scoring systems. In conclusion, risk of requiring ICU can be more accurately predicted using PREEMPT-2 and PREAMBLE-2, as described here, than by other early warning scoring systems developed over recent years.

  14. Information systems project management

    CERN Document Server

    Olson, David

    2014-01-01

    Information Systems Project Management addresses project management in the context of information systems. It deals with general project management principles, with focus on the special characteristics of information systems. It is based on an earlier text, but shortened to focus on essential project management elements.This updated version presents various statistics indicating endemic problems in completing information system projects on time, within budget, at designed functionality. While successful completion of an information systems project is a challenge, there are some things that ca

  15. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  16. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  17. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  18. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  19. Management of Mild Traumatic Brain Injury at the Emergency Department and Hospital Admission in Europe : A Survey of 71 Neurotrauma Centers Participating in the CENTER-TBI Study

    NARCIS (Netherlands)

    Foks, Kelly A.; Cnossen, Maryse C.; Dippel, Diederik W. J.; Maas, Andrew I. R.; Menon, David; van der Naalt, Joukje; Steyerberg, Ewout W.; Lingsma, Hester F.; Polinder, Suzanne

    2017-01-01

    Previous studies have indicated that there is no consensus about management of mild traumatic brain injury (mTBI) at the emergency department (ED) and during hospital admission. We aim to study variability between management policies for TBI patients at the ED and at the hospital ward across Europe.

  20. Glycemic control in patients with diabetes mellitus upon admission to a dental clinic: considerations for dental management.

    Science.gov (United States)

    Rhodus, Nelson L; Vibeto, Bryan M; Hamamoto, Darryl T

    2005-06-01

    The purpose of this study was to determine the level of glycemic control in dental patients with diabetes upon admission to a dental school clinic. One hundred patients (mean age: 57.7 years) of the Oral Diagnosis-Admissions Clinic at the University of Minnesota School of Dentistry, Minneapolis, Minnesota, with diabetes mellitus were chosen as subjects. Fasting blood glucose was measured using a portable blood glucose monitoring device as a part of their initial dental examination. Twenty-eight of the 100 patients were found to be hyperglycemic (> or = 126 mg/dl; 174.8 +/- 40.8 mg/dl; mean +/- SEM); 2 patients were found to be hypoglycemic (diabetes in the cohort, 3 (37.5%) were very hyperglycemic, with fasting blood glucose levels > 250 mg/dl. This is important information for dental practitioners because patients with diabetes may not be under good glycemic control, and dentists may have to take special precautions before, during, and after treatment. This paper reviews the pathogenesis of diabetes, the detection of patients with undiagnosed or poorly controlled diabetes, and the management of patients with diabetes during dental treatment.

  1. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available purposes until the assets are exhausted. This paper addresses elements of environmental crime and the risk management strategies as part of EAP, including risk management system functions. A unique implemented risk management system in the Kruger National...

  2. Environmental compliance management system

    Energy Technology Data Exchange (ETDEWEB)

    Cason, A. [Dow Chemical Co., Midland, MI (United States); Larrinaga, L.

    1995-12-01

    A cross-functional team of environmental regulatory experts, plant managers, and plant engineers have been working since 1991 on the development, implementation and maintenance of the Environmental Compliance Management System. The Environmental Compliance Management System is a practical and accurate method of determining the applicability of the state and federal environmental regulations and of establishing standard and straightforward procedures to meet these requirements. The Environmental Compliance Management System allows individual manufacturing facilities to avoid the additional manpower that would be required to read, digest and decide on the applicability and plan of action to meet the requirements of all the environmental regulations.

  3. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  4. Lithium battery management system

    Science.gov (United States)

    Dougherty, Thomas J [Waukesha, WI

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  5. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  6. Metadata management staging system

    Energy Technology Data Exchange (ETDEWEB)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. An evolution of our Node.js and CouchDb metadata management system. This one focuses on server functionality and uses a well-documented, rational and REST-ful API for data access.

  7. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  8. Quality Management and Integrated Management System

    OpenAIRE

    BŘICHÁČKOVÁ, Lenka

    2011-01-01

    Graduation theses is directed on the Management System and the characteristics of the company and its development since 2003. Theses is introduced on the Integrated Management System, which consists of the Quality Management System, the Environmental Management System and the Occupational Health and Safety Assessment Series. The theses is especially directed on the Occupational Health and Safety Assessment Series. Management System is analyzed and steps are recommended to improve these proces...

  9. A Computerized Hospital Patient Information Management System

    Science.gov (United States)

    Wig, Eldon D.

    1982-01-01

    The information processing needs of a hospital are many, with varying degrees of complexity. The prime concern in providing an integrated hospital information management system lies in the ability to process the data relating to the single entity for which every hospital functions - the patient. This paper examines the PRIMIS computer system developed to accommodate hospital needs with respect to a central patient registry, inpatients (i.e., Admission/Transfer/Discharge), and out-patients. Finally, the potential for expansion to permit the incorporation of more hospital functions within PRIMIS is examined.

  10. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  11. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  12. Addendum to: on a possible Lie-admissible covering of the Galilei relativity in Newtonian mechanics for nonconservative and Galilei form-noninvariant systems

    Energy Technology Data Exchange (ETDEWEB)

    Santilli, R.M.

    1978-10-01

    In this note I first present a needed clarification on the realization of Lie-admissible algebras for non-conservative Newtonian systems considerd in a recent paper. The following aspects are then treated (A) I introduce a new realization which is directly applicable to all nonconservative systems of the admitted class (local, class C and regular) via the solution of simple algebraic systems. (B) I indicated that such a realization yields compatible generalized formulations of Hamilton-admissible, Lie-admissible and symplectic-admissible type. (C) I show in details that such a realization is applicable to the construction of th eLie-admissible generalization of the Galilei relativity I proposed for nonconservative systems, and I work out a number of examples. (D) I then prove that, for the subclass of autonomous systems, the time-component of the proposesd generalized relativity is indeed universal, that is, it provides the form-invariant description of all systems considered, while being able to recover the conventional time component of the Galilei relativity at the limit of the null value of the Galilei symmetry-breaking forces. And, finally, (E) I prove that the dual Lie-admissible algebraic and sympletic-admissible geometrical character of the proposed generalized relativity is independent from the selected system of local coordinates, by therefore confirming the hope for a coordinate free-globalization of the symplectic-admissible geometry and relativity.

  13. Hospital admissions for respiratory system diseases in adults with intellectual disabilities in Southeast London: a register-based cohort study.

    Science.gov (United States)

    Chang, Chin-Kuo; Chen, Chih-Yin; Broadbent, Mathew; Stewart, Robert; O'Hara, Jean

    2017-03-29

    Intellectual disability (ID) carries a high impact on need for care, health status and premature mortality. Respiratory system diseases contribute a major part of mortality among people with ID, but remain underinvestigated as consequent morbidities. Anonymised electronic mental health records from the South London and Maudsley Trust (SLaM) were linked to national acute medical care data. Using retrospective cohort and matched case-control study designs, adults with ID receiving SLaM care between 1 January 2008 and 31 March 2013 were identified and compared with local catchment residents for respiratory system disease admissions. Standardised admission ratios (SARs) were first calculated, followed by a comparison of duration of hospitalisation with respiratory system disease between people with ID and age-matched and gender-matched random counterparts modelled using linear regression. Finally, the risk of readmission for respiratory system disease was analysed using the Cox models. For the 3138 adults with ID identified in SLaM, the SAR for respiratory system disease admissions was 4.02 (95% CI 3.79 to 4.26). Compared with adults without ID, duration of hospitalisation was significantly longer by 2.34 days (95% CI 0.03 to 4.64) and respiratory system disease readmission was significantly elevated (HR=1.35; 95% CI 1.17 to 1.56) after confounding adjustment. Respiratory system disease admissions in adults with ID are more frequent, of longer duration and have a higher likelihood of recurring. Development and evaluation of potential interventions to the preventable causes of respiratory diseases should be prioritised. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  14. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  15. "We don't have the infrastructure to support them at home": How health system inadequacies impact on long-term care admissions of people with dementia.

    Science.gov (United States)

    Donnelly, Nora-Ann; Humphries, Niamh; Hickey, Anne; Doyle, Frank

    2017-12-01

    The influence of healthcare system factors on long-term care admissions has received relatively little attention. We address this by examining how inadequacies in the healthcare system impact on long-term care admissions of people with dementia. This is done in the context of the Irish healthcare system. Thirty-eight qualitative in-depth interviews with healthcare professionals and family carers were conducted. Interviews focused on participants' perceptions of the main factors which influence admission to long-term care. Interviews were analysed thematically. The findings suggest that long-term care admissions of people with dementia may be affected by inadequacies in the healthcare system in three ways. Firstly, participants regarded the economic crisis in Ireland to have exacerbated the under-resourcing of community care services. These services were also reported to be inequitable. Consequently, the effectiveness of community care was seen to be limited. Secondly, such limits in community care appear to increase acute hospital admissions. Finally, admission of people with dementia to acute hospitals was believed to accelerate the journey towards long-term care. Inadequacies in the healthcare system are reported to have a substantial impact on the threshold for long-term care admissions. The findings indicate that we cannot fully understand the factors that predict long-term care admission of people with dementia without accounting for healthcare system factors on the continuation of homecare. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Temporizing surgical management improves outcome in patients with Vibrio necrotizing fasciitis complicated with septic shock on admission.

    Science.gov (United States)

    Hong, Guang-Liang; Dai, Xiao-Qin; Lu, Cai-Jiao; Liu, Jia-Ming; Zhao, Guang-Ju; Wu, Bin; Li, Meng-Fang; Lu, Zhong-Qiu

    2014-05-01

    Necrotizing fasciitis (NF) caused by Vibrio infection is one of the most fatal diseases, resulting in high morbidity and mortality. Early diagnosis and effective surgical intervention are the mainstays for better outcomes for affected patients. Currently, standard surgical management calls for prompt and aggressive debridement and amputation. However, due to its rapid progression and deterioration, 50-60% of Vibrio NF cases present with septic shock and multiple organ dysfunction on admission. These patients, who usually have many surgical contraindications, are unable to tolerate a prolonged aggressive surgical debridement. Therefore, determining the optimal surgical intervention for these particularly severe patients remains a formidable problem in emergency medicine. A retrospective study was conducted on patients who underwent surgery for Vibrio NF and septic shock on admission to the emergency room from April 2001 to October 2012. These patients received the same treatment protocol, with the exception of the initial surgical intervention strategy. Nineteen patients were treated with a temporizing strategy, which called for simple incisions and drainage under regional anesthesia, followed by complete debridement 24h later. Another fifteen patients underwent aggressive surgical debridement during the first operative procedure. Basic demographics, laboratory results on admission, clinical course and outcomes were compared to assess the efficacy and safety of two initial surgical treatment methods: the temporizing strategy and the aggressive strategy. Thirty-four patients were included in this study, and the average age was 51.65 years. Chronic liver disease was the most prevalent preexisting condition (50.00%) and the lower limbs were most commonly involved in infection (76.47%). In this patient population, 19 cases underwent surgery with a temporizing therapeutic strategy, while the remaining 15 cases were treated with an aggressive surgical strategy. There were

  17. Intranet Document Management Systems.

    Science.gov (United States)

    Wen, H. Joseph; Yen, David C.; Lin, Binshan

    1998-01-01

    Explains how intranets facilitate documentation availability within a company at substantial cost savings. Topics include intranet document management systems (IDMS); publication costs for printed materials; hardware and software specifications; performance; and security. (Author/LRW)

  18. Correspondence Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — CMS is EPA's correspondence tracking and workflow management system. It scans, logs, routes, tracks, and stores incoming and outgoing correspondence in all Program...

  19. Holdings Management System

    Data.gov (United States)

    National Archives and Records Administration — This system supports the physical management of permanent, hard-copy archival Records in the custody of National Archives and Records Administration program offices.

  20. Earned Value Management System

    Data.gov (United States)

    US Agency for International Development — EVMS is a system for measuring project performance and progress in an objective manner by supporting earned value management. EVMS has the ability to combine...

  1. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  2. Portfolio Management System

    Data.gov (United States)

    US Agency for International Development — PfMS is an implementation of WorkLenz. WorkLenz is USAID's portfolio management system tool. It is a commercially available, off-the-shelf (COTS) package that...

  3. Effectiveness of an Integrated Tertiary Software Mobile Information System for Student Registration and Admission at a University in Gauteng

    Directory of Open Access Journals (Sweden)

    Frans MASHABELA

    2017-07-01

    Full Text Available This study investigates whether the new online registration and admission system implemented at a Tertiary Institution in Gauteng, South Africa, was successful and effective. The Institution under study is the first in South Africa to implement this new online registration system from the 3rd of January 2013 using a system called the Integrated Tertiary Software (ITS Mobile information system. The information system enables students to apply online without physically visiting the institution and provides the status of their registration and admission applications via their smartphones. A total of one hundred 1st year students and ten personnel were sampled to respond to self-completed questionnaires. The efficiency of this new online system was evaluated using the Technology Acceptance Model (TAM, the Web of System Performance (WOSP model and the DeLone and McLean IS Success model as well as the indicators of system ineffectiveness and attributes on the basis of which an information system was evaluated. Key findings emerging from the data analysis and interpretation show that the new online system met the expectations of most staff and students with the exception of few staff members and students. The findings show that the investment made on the new online registration system is benefiting the University and students. The implementation of the new online registration and admission system was a success to a larger extent because the expectations of most users were met. The online system is effective as it was evaluated using the conventional measuring methods and resulted in positive outcomes.

  4. Database Management System

    Science.gov (United States)

    1990-01-01

    In 1981 Wayne Erickson founded Microrim, Inc, a company originally focused on marketing a microcomputer version of RIM (Relational Information Manager). Dennis Comfort joined the firm and is now vice president, development. The team developed an advanced spinoff from the NASA system they had originally created, a microcomputer database management system known as R:BASE 4000. Microrim added many enhancements and developed a series of R:BASE products for various environments. R:BASE is now the second largest selling line of microcomputer database management software in the world.

  5. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  6. Audit Management System

    CERN Document Server

    Alconada, Federico

    2015-01-01

    In the need of renewing their system, the Internal Audit department has given a proposal for building a new one. Taking into consideration the problems of their system they elaborated a requirement's list with the functionalities and features they were expecting from the new management system. This new system would be primarily for the use of the Internal Audit staff but it would also support the follow-up of internal audit recommendations by potentially all CERN staff members.

  7. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  8. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  9. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P.; Verho, P.; Kaerenlampi, M.; Pitkaenen, M. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion to the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. Nowadays the SCADA is the main computer system (and often the only) in the control center. However, the information displayed by the SCADA is often inadequate, and several tasks cannot be solved by a conventional SCADA system. A need for new computer applications in control center arises from the insufficiency of the SCADA and some other trends. The latter means that the overall importance of the distribution networks is increasing. The slowing down of load-growth has often made network reinforcements unprofitable. Thus the existing network must be operated more efficiently. At the same time larger distribution areas are for economical reasons being monitored at one control center and the size of the operation staff is decreasing. The quality of supply requirements are also becoming stricter. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the

  10. Joint Resource Allocation and Admission Control Mechanism for an OFDMA-Based System

    DEFF Research Database (Denmark)

    Meucci, Filippo; Mihovska, Albena D.; Anggorojati, Bayu

    2008-01-01

    This paper describes a Call Admission Control (CAC) mechanism that adapts the type of admitted users based on a proposed resource allocation strategy that responds to changes in the channel conditions. The admission control decides to admit new services according to the load of the cell and based...... on a-priori analysis of the radio link for the incoming request in terms of QoS satisfaction. For low to medium values of the load the Resource Allocation (RA) grants resources to user with higher priority. The priority is defined based on user and service characteristics. For very high load values...... the mechanism will aim at maximising the number of users that receive a connection even the QoS for high priority users must be degraded....

  11. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  12. General Practitioners and Involuntary Admission

    DEFF Research Database (Denmark)

    Jepsen, Britta; Lomborg, Kirsten; Engberg, Marianne

    2010-01-01

    Background: In many countries, medical authorities are responsible for involuntary admissions of mentally ill patients. Nonetheless, very little is known about GPs' experiences with involuntary admission. Aim: The aim of the present study was to explore GP's experiences from participating in invo...... by the psychiatric system. Conclusion: The unpleasant experiences and induced feelings resulting from involuntary admissions reflect an undesirable and stressful working environment.......Background: In many countries, medical authorities are responsible for involuntary admissions of mentally ill patients. Nonetheless, very little is known about GPs' experiences with involuntary admission. Aim: The aim of the present study was to explore GP's experiences from participating...... in involuntary admissions. Setting: General practice, Aarhus, Denmark. Method: One focus group interview and six individual interviews were conducted with 13 Danish GPs, who had recently sectioned one of their own patients. Results: GPs experienced stress and found the admission procedure time consuming...

  13. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  14. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  15. Anesthesia information management systems

    Directory of Open Access Journals (Sweden)

    Feri Štivan

    2014-08-01

    Full Text Available Introduction: The use of anesthesia information management systems (AIMS is on the increase. This is particularly true for academic anesthesia departments. The main reasons for slow adoption of these systems in the past are financial barriers associated with implementation of these systems and their not so traditionally obvious potential to improve patient care. In addition, a major obstacle to acceptance of this technology is the concern of users over the impact of the electronic anesthesia record on malpractice exposure.Conclusions: The experience reported by departments using AIMS indicates that these systems are useful for managing malpractice risk. AIMS can enhance the efficiency and effectiveness of preoperative, intraoperative, and post-operative anesthesia care. However, AIMS are able to increase the quality of care and improve operating room efficiency only with careful planning, installation, and customization. Strengths, weaknesses, opportunities and threats (SWOT analysis performed for AIMS could help departments in making better decisions when implementing AIMS.

  16. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  17. Distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Kaerenlampi, M.; Pitkaenen, M.; Jaerventausta, P.; Partanen, J.

    1997-12-31

    This report comprises a general description of the results obtained in the research projects `Information system applications of a distribution control center`, `Event analysis in primary substation`, and `Distribution management system` of the EDISON research program during the years of 1993 - 1997. The different domains of the project are presented in more detail in other reports. An operational state analysis of a distribution network has been made from the control center point of view and the functions which can not be solved by a conventional SCADA system are determined. The basis for new computer applications is shown to be integration of the computer systems. The main result of the work is a distribution management system (DMS), which is an autonomous system integrated to the existing information systems, SCADA and AM/FM/GIS. The system uses a large number of modelling and computation methods and provides an extensive group of advanced functions to support the distribution network monitoring, fault management, operations planning and optimization. The development platform of the system consists of a Visual C++ programming environment, Windows NT operating system and PC. During the development the DMS has been tested in a pilot utility and it is nowadays in practical use in several Finnish utilities. The use of a DMS improves the quality and economy of power supply in many ways; the outage times can, in particular, be reduced using the system. Based on the achieved experiences some parts of the DMS reached the commercialization phase, too. Initially the commercial products were developed by a software company, Versoft Oy. At present the research results are the basis of a worldwide software product supplied by ABB Transmit Co. (orig.) EDISON Research Programme. 28 refs.

  18. DIRAC Workload Management System

    CERN Document Server

    Garonne, V; Stokes-Rees, I

    2005-01-01

    The Workload Management System is the core component of the DIRAC distributed MC production and analysis grid environment of the CERN LHCb experiment. This paper discusses the architecture, implementation and performance of this system. The WMS is a community scheduler, realizing a pull paradigm, particulary for the high troughput computing context. It has recently been used for an intensive physics simulation production involving more than 60 sites, 65 TB of data, and over 1000-GHz processor-years.

  19. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  20. Pollution management system

    DEFF Research Database (Denmark)

    2015-01-01

    A pollution management system comprises an array of one or more inlets and at least one outlet. The one or more inlets are arranged to collect polluted air and supply said polluted air to a polluted air treatment element. The one or more inlets each comprise a respective inlet sensor for measuring...

  1. Visual management support system

    Science.gov (United States)

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  2. An audit of acute oncology services: patient experiences of admission procedures and staff utilisation of a new telephone triage system.

    Science.gov (United States)

    Warrington, Lorraine; Holch, Patricia; Kenyon, Lucille; Hector, Ceri; Kozlowska, Krystina; Kenny, Anne Marie; Ziegler, Lucy; Velikova, Galina

    2016-12-01

    In 2010, St. James Institute of Oncology (Leeds, UK) created a new acute oncology service (AOS) consisting of a new admissions unit with a nurse-led telephone triage (TT) system. This audit cycle (March 2011 and June 2013) evaluated patient experiences of the reconfigured AOS and staff use of the TT system. Patient views were elicited via a questionnaire and semi-structured interviews. The TT forms were analysed descriptively evaluating completion and data quality, reported symptoms and their severity and advice given (including admission rates). Patients (n = 40) reported high satisfaction with the new AOS. However, 56 % of patients delayed 2 days or more before contacting the unit. In 2011, 26 % of all the admitted patients were triaged via the TT system; 133 TT forms were completed. In June 2013, 49 % of the admitted patients were triaged; 264 forms were completed. The most commonly reported symptoms on the TT forms were pain, pyrexia/rigors/infection, diarrhoea, vomiting and dyspnoea. Half of the patients using the TT system were admitted (52 % in 2011, 49 % in 2013). Our audit provided evidence of successful implementation of the TT system with the number of TT forms doubling from 2011 to 2013. The new AOS was endorsed by patients, with the majority satisfied with the care they received.

  3. Admission Control for Multiservices Traffic in Hierarchical Mobile IPv6 Networks by Using Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    Jung-Shyr Wu

    2012-01-01

    Full Text Available CAC (Call Admission Control plays a significant role in providing QoS (Quality of Service in mobile wireless networks. In addition to much research that focuses on modified Mobile IP to get better efficient handover performance, CAC should be introduced to Mobile IP-based network to guarantee the QoS for users. In this paper, we propose a CAC scheme which incorporates multiple traffic types and adjusts the admission threshold dynamically using fuzzy control logic to achieve better usage of resources. The method can provide QoS in Mobile IPv6 networks with few modifications on MAP (Mobility Anchor Point functionality and slight change in BU (Binding Update message formats. According to the simulation results, the proposed scheme presents good performance of voice and video traffic at the expenses of poor performance on data traffic. It is evident that these CAC schemes can reduce the probability of the handoff dropping and the cell overload and limit the probability of the new call blocking.

  4. Petascale system management experiences.

    Energy Technology Data Exchange (ETDEWEB)

    Desai, N.; Bradshaw, R.; Lueninghoener, C.; Cherry, A.; Coghlan, S.; Scullin, W. (LCF); ( MCS)

    2008-01-01

    National Laboratory, and a 504 TF Opteron-based system has been deployed at Texas Advanced Computing Center (TACC). Intrepid is comprised of 40,960 nodes with a total of 163,840 cores. While systems like these are uncommon now, we expect them to become more widespread in the coming years. The scale of these large systems impose several requirements upon system architecture. The need for scalability is obvious, however, power efficiency and density constraints have become increasingly important in recent years. At the same time, because the size of administrative staff cannot grow linearly with the system size, more efficient system management techniques are needed. In this paper we will describe our experiences administering Intrepid. Over the last year, we have experienced a number of interesting challenges in this endeavor. Our initial expectation was for scalability to be the dominant system issue. This expectation was not accurate. Several issues expected to have minor impact have played a much greater role in system operations. Debugging, due to the large numbers of components used in scalable system operations, has become a much more difficult endeavor. The system has a sophisticated monitoring system, however, the analysis of this data has been problematic. These issues are not specific to HPC workloads in any way, so we expect them to be of general interest. This paper consists of three major parts. First, we will provide a detailed overview of several important aspects of Intrepid's hardware and software. In this, we will highlight aspects that have featured prominently in our system management experiences. Next, we will describe our administration experiences in detail. Finally, we will draw some conclusions based on these experiences. In particular, we will discuss the implications for the non-HPC world, system managers, and system software developers.

  5. Smart energy management system

    Science.gov (United States)

    Desai, Aniruddha; Singh, Jugdutt

    2010-04-01

    Peak and average energy usage in domestic and industrial environments is growing rapidly and absence of detailed energy consumption metrics is making systematic reduction of energy usage very difficult. Smart energy management system aims at providing a cost-effective solution for managing soaring energy consumption and its impact on green house gas emissions and climate change. The solution is based on seamless integration of existing wired and wireless communication technologies combined with smart context-aware software which offers a complete solution for automation of energy measurement and device control. The persuasive software presents users with easy-to-assimilate visual cues identifying problem areas and time periods and encourages a behavioural change to conserve energy. The system allows analysis of real-time/statistical consumption data with the ability to drill down into detailed analysis of power consumption, CO2 emissions and cost. The system generates intelligent projections and suggests potential methods (e.g. reducing standby, tuning heating/cooling temperature, etc.) of reducing energy consumption. The user interface is accessible using web enabled devices such as PDAs, PCs, etc. or using SMS, email, and instant messaging. Successful real-world trial of the system has demonstrated the potential to save 20 to 30% energy consumption on an average. Low cost of deployment and the ability to easily manage consumption from various web enabled devices offers gives this system a high penetration and impact capability offering a sustainable solution to act on climate change today.

  6. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  7. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    of integration. The focus of the article is primarily to discuss three ambition levels of integration: from increased compatibility of system elements over coordination of generic processes to an embeddedness of an integrated management system (IMS) in a culture of learning and continuous improvements......Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects....... At present, national IMS standards are being developed, and the IMS standards in Denmark and Spain are being analysed regarding the ambition level for integration. Should the ISO organisation decide to make a standard for IMS, then it would be necessary to consider the different levels of integration...

  8. Properties of the set of admissible 'state-control' pairs for first-order evolution control systems

    International Nuclear Information System (INIS)

    Tolstonogov, A A

    2001-01-01

    We consider a control system described by a non-linear first-order evolution equation on an evolution triple of Banach spaces (a 'Gelfand triple') with a mixed multivalued control constraint whose values are non-convex closed sets in the control space. Besides the original system, we consider systems with the following control constraints: the constraint whose values are the closed convex hulls of the values of the original constraint, and the constraint whose values are the extreme points of the convexified constraint that belong to the original one. We study topological properties of the sets of admissible 'state-control' pairs for the same system with various constraints and consider the relations between them. An example of a non-linear parabolic control system is worked out in detail

  9. Mastering the management system.

    Science.gov (United States)

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  10. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  11. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  12. Prevention of hospital payment errors and implications for case management: a study of nine hospitals with a high proportion of short-term admissions over time.

    Science.gov (United States)

    Hightower, Rebecca E

    2008-01-01

    medical advice) occurring during the baseline and remeasurement time frames was examined. The baseline period consisted of 1 month's claims-the complete month just prior to the start of approved project activities. Remeasurement was performed by each hospital and reported to the Quality Improvement Organization on a monthly basis following implementation of the hospital's quality improvement plan. Each hospital was required to provide a monthly remeasurement report by indicator until it had met its stated goal(s) for improvement for 2 consecutive months; therefore, each hospital completed its required monthly reporting for a specific indicator in a different month. Results were calculated for the following indicators: INDICATOR 1: Proportion of unnecessary short-term admissions = number of unnecessary short-term inpatient admissions/total short-term inpatient admissions in time frame. INDICATOR 2: Proportion of errors in billed treatment setting, that is, outpatient observation billed as inpatient = number of errors in billed treatment setting/total short-term admissions in time frame.Six of the 9 hospitals were able to accomplish reduction of their error rates within 6 months from the beginning of the study. The seventh hospital reached its goals in the 7th month, with the 2 remaining hospitals making progress toward their goals by the conclusion of the study. 1 Case managers must be up-to-date with payor requirements regarding medical record documentation for medical necessity of services and timing of inpatient admission, e.g., for Medicare, the date and time of the written physician's order for admission to the inpatient care setting is the date and time of inpatient admission. 2 The balancing of clinical decisions and financial considerations required of case managers in hospital settings remains an ongoing challenge. 3 Senior leadership must be engaged in ensuring the success of the case management program by providing the resources required. 4 Managers of case

  13. Pacing system malfunction is a rare cause of hospital admission for syncope in patients with a permanent pacemaker.

    Science.gov (United States)

    Ofman, Peter; Rahilly-Tierney, Catherine; Djousse, Luc; Peralta, Adelqui; Hoffmeister, Peter; Gaziano, J Michael; Weiss, Alexey; Lotan, Chaim; Rosenheck, Shimon

    2013-01-01

    Few studies have examined the prevalence of permanent pacemaker (PPM) malfunction among patients with a previously implanted pacemaker admitted to the hospital with syncope. This study sought to examine causes of syncope in patients with a previously implanted pacemaker admitted to our hospital with syncope. We retrospectively reviewed our hospital admission database for patients who had both keywords "syncope" and "pacemaker" as their diagnoses from January 1, 1995 until June 1, 2012. One hundred and sixty-two patients who were admitted to the hospital because of syncope and had a PPM implanted prior to the index syncopal episode were included. All patients had pacemakers interrogated during the admission. Two independent physicians examined the discharge summary of each patient and determined the cause of syncope in each case. Of the 162 patients studied, eight (4.9%) were found to have pacemaker system malfunction as a cause of syncope. In 96 patients (59.2%), the cause of syncope could not be determined prior to hospital discharge. Among the identifiable causes of syncope, orthostatic hypotension was most prevalent (16%) followed by vasovagal (6%), severe aortic stenosis (4.3%), atrial arrhythmia (3.1%), acute and subacute infection (3.1%), and other less prevalent causes (3.1%). In this study, PPM system malfunction was rarely a cause of syncope in patients admitted to the hospital with a previously implanted device. ©2012, The Authors. Journal compilation ©2012 Wiley Periodicals, Inc.

  14. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  15. DIRAC Workload Management System

    CERN Document Server

    Paterson, S

    2007-01-01

    DIRAC (Distributed Infrastructure with Remote Agent Control) is the Workload and Data Management system (WMS) for the LHCb experiment. The DIRAC WMS offers a transparent way for LHCb users to submit jobs to the EGEE Grid as well as local clusters and individual PCs. This paper will describe workload management optimizations, which ensure high job efficiency and minimized job start times. The computing requirements of the LHCb experiment can only be fulfilled through the use of many distributed compute resources. DIRAC provides a robust platform to run data productions on all the resources available to LHCb including the EGEE Grid. More recently, user support was added to DIRAC that greatly simplifies the procedure of submitting, monitoring and retrieving output of Grid jobs for the LHCb user community. DIRAC submits Pilot Agents to the EGEE Grid via the gLite WMS as normal jobs. Pilot Agents then request jobs from the DIRAC Workload Management System after the local environment has been checked. Therefore DIR...

  16. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  17. Programmatic risk management system

    Energy Technology Data Exchange (ETDEWEB)

    Mahn, J. [Sandia National Labs., Albuquerque, NM (United States); Wood, C.L. [Automated Solutions of Albuquerque, NM (United States)

    1996-07-01

    The purpose of the Programmatic Risk Management System (PRMS) is to evaluate and manage potential risks associated with proposed projects (i.e., new products or processes, or possible research and technological development projects). Although the PRMS considers some technical aspects of risk, the primary focus of the methodology is programmatic risk. That is, the methodology permits an assessment of risks associated with such issues as the ability to successfully produce a product that performs in accordance with all customer requirements, and the availability and allocation of resources (money, equipment, facilities, skilled personnel). The PRMS process consists of five formalized activities that are essential for effective management of risks associated with proposed projects. These activities include risk assessment, development of appropriate risk mitigation strategies, estimating strategy implementation cost, ranking of risk mitigation strategies for resource allocation, and scheduling of strategy implementing. The PRMS utilizes a ranking system that allows the user to identify the most cost-effective investment of resources of minimizing risk.

  18. Test-Based Admission to Selective Universities:

    DEFF Research Database (Denmark)

    Thomsen, Jens-Peter

    2016-01-01

    in the social gradient in the primary admission system, admitting students on the basis of their high school grade point average, and in the secondary admission system, admitting university students based on more qualitative assessments. I find that the secondary higher education admission system does...

  19. Bank Customers Management System

    Directory of Open Access Journals (Sweden)

    Ebubeogu Amarachukwu Felix

    2015-08-01

    Full Text Available ABSTRACT The purpose of this project is in partial fulfilment of the requirements of Bachelor of Science Hon in Information Technology. The Design and development of this Bank customers Management system provides a more secured approach in managing bank customers information which strengthens the relationships between banks and their customers by providing the right solutions that uses a multi-level security to improve customer satisfaction. The technology used in developing this project is ASP.NET and the programming language used to develop this project is C and the IDE used is Microsoft Visual Studio 2013 professional in designing the front end while the back end uses Microsoft SQL Server 2012.

  20. Management Information Systems at CERN

    OpenAIRE

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  1. Remedial action graphics management system

    International Nuclear Information System (INIS)

    Madson, M.E.

    1987-01-01

    The objective of the Graphics Management System is to provide a visual display of the Grand Junction vicinities properties status as a cost effective management tool. Capabilities of the system are listed and a series of sample displays are presented

  2. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  3. A Multiagent System for Distributed Systems Management

    OpenAIRE

    H. M. Kelash; H. M. Faheem; M. Amoon

    2007-01-01

    The demand for autonomous resource management for distributed systems has increased in recent years. Distributed systems require an efficient and powerful communication mechanism between applications running on different hosts and networks. The use of mobile agent technology to distribute and delegate management tasks promises to overcome the scalability and flexibility limitations of the currently used centralized management approach. This work proposes a multiagent s...

  4. Cryptographic Key Management System

    Energy Technology Data Exchange (ETDEWEB)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  5. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  6. Supplier Management System

    Science.gov (United States)

    Ramirez, Eric; Gutheinz, Sandy; Brison, James; Ho, Anita; Allen, James; Ceritelli, Olga; Tobar, Claudia; Nguyen, Thuykien; Crenshaw, Harrel; Santos, Roxann

    2008-01-01

    Supplier Management System (SMS) allows for a consistent, agency-wide performance rating system for suppliers used by NASA. This version (2.0) combines separate databases into one central database that allows for the sharing of supplier data. Information extracted from the NBS/Oracle database can be used to generate ratings. Also, supplier ratings can now be generated in the areas of cost, product quality, delivery, and audit data. Supplier data can be charted based on real-time user input. Based on these individual ratings, an overall rating can be generated. Data that normally would be stored in multiple databases, each requiring its own log-in, is now readily available and easily accessible with only one log-in required. Additionally, the database can accommodate the storage and display of quality-related data that can be analyzed and used in the supplier procurement decision-making process. Moreover, the software allows for a Closed-Loop System (supplier feedback), as well as the capability to communicate with other federal agencies.

  7. Computerized training management system

    Energy Technology Data Exchange (ETDEWEB)

    Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  8. Computerized training management system

    Energy Technology Data Exchange (ETDEWEB)

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  9. Impact of a chronic disease management program on hospital admissions and readmissions in an Australian population with heart disease or diabetes.

    Science.gov (United States)

    Hamar, G Brent; Rula, Elizabeth Y; Wells, Aaron; Coberley, Carter; Pope, James E; Larkin, Shaun

    2013-04-01

    Chronic disease management programs (CDMPs) were introduced in Australia to reduce unnecessary health care utilization by the growing population with chronic conditions; however, evidence of effectiveness is needed. This study evaluated the impact of a comprehensive CDMP, My Health Guardian (MHG), on rate of hospital admissions, readmissions, and average length of hospital stay (ALOS) for insured individuals with heart disease or diabetes. Primary outcomes were assessed through retrospective comparison of members in MHG (treatment; n=5053) to similar nonparticipating members (comparison; n=23,077) using a difference-in-differences approach with the year before program commencement serving as baseline and the subsequent 12 or 18 months serving as the program periods. All outcomes were evaluated for the total study population and for disease-matched subgroups (heart disease and diabetes). Statistical tests were performed using multivariate regression controlling for age, sex, number of chronic diseases, and past hospitalization status. After both 12 and 18 months, treatment members displayed decreases in admissions (both, P≤0.001) and readmissions (both, P≤0.01), and ALOS after 18 months (P≤0.01) versus the comparison group; magnitude of impact increased over time for these 3 measures. All outcomes for both disease-matched subgroups directionally mirrored the total study group, but the diabetes subgroup did not achieve significance for readmissions or ALOS. Within the treatment group, admissions decreased with increasing care calls to members (12 and 18 months, Phospital admissions and presents a promising approach to reduce the burden associated with hospitalizations in populations with chronic disease.

  10. A standardized crisis management model for self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder: The Brief Admission Skåne randomized controlled trial protocol (BASRCT).

    Science.gov (United States)

    Liljedahl, Sophie I; Helleman, Marjolein; Daukantaité, Daiva; Westrin, Åsa; Westling, Sofie

    2017-06-15

    Brief Admission is a crisis and risk management strategy in which self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder self-admit to hospital at times of increasing risk when other efforts to stay safe are failing. Standardized in the current randomized controlled trial, the intensity of Brief Admission Skåne is implemented in durations of three days, with a maximum frequency of three times a month. Brief Admission is integrated into existing treatment plans in advance of crises to prevent reliance on general psychiatric admissions for risk management, as these may be lengthy, unstructured, and of uncertain therapeutic value. The overall objective of the Brief Admission Skåne randomized controlled trial is to determine if Brief Admission can replace general psychiatric admission for self-harming and suicidal individuals with complex mental illness at times of escalating risk. Other objectives of the study are to evaluate whether Brief Admission increases daily functioning and enhances coping, reduces psychiatric symptoms including frequency and severity of self-harm and suicidal behaviours. A final objective is to determine if Brief Admission is an effective crisis management model for this population. Participants are randomized at an individual level to either Brief Admission Skåne plus Treatment as Usual or Treatment As Usual. Based on a priori power analyses, N = 124 participants will be recruited to the study. Data collection is in progress, and will continue until June 2018. All participant data are single-blinded and will be handled with intention-to-treat analysis. Based on the combined clinical experience of our international research group, the Brief Admission Skåne randomized controlled trial upon which the current protocol is based represents the first initiative to standardize, implement and evaluate Brief Admission amongst self-harming and suicidal individuals, including those with

  11. Nonimmigrant Admissions - Annual Report

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  12. A COMPARISON OF THE CLASS ACTION FOR DAMAGES IN THE AMERICAN JUDICIAL SYSTEM TO THE BRAZILIAN CLASS ACTION: THE REQUIREMENTS OF ADMISSIBILITY

    Directory of Open Access Journals (Sweden)

    A. P. Grinover

    2015-01-01

    Full Text Available After describing the class action for damages in the American judicial system, with the requisites of ‘prevalence’ and ‘superiority,’ the study passes to the examiner of the requirements of the admissibility of the Brazilian class action for damages, concluding on the existence of the same requisites, even in a civil law system.

  13. Changeability of production management systems

    NARCIS (Netherlands)

    Hoogenraad, M. S.; Wortmann, J. C.; Olhager, J; Persson, F

    2007-01-01

    Modem production management systems consist of transaction processing systems and decision enhancement systems. A clear example of two such components are an ERP systems and APS systems. These systems are often standard software systems, and therefore suitable for many different situations. This

  14. Manpower management information system /MIS/

    Science.gov (United States)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  15. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  16. Informational system. Documents management

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2009-12-01

    Full Text Available Productivity growing, as well as reducing of operational costs in a company can be achieved by adopting a document management solutions. Such application will allow management and structured and efficient transmission of information within the organization.

  17. ASCOT data base management system

    Energy Technology Data Exchange (ETDEWEB)

    Barbieri, J.; Nyholm, R.; Castro, C.; Hill, K.

    1980-07-01

    The ASCOT data base management system is designed to handle the data produced by both the experimental and theoretical efforts of the DOE Atmospheric Studies in Complex Terrain (ASCOT) project. The data base envisioned is hierarchically structured, sparse, and compact. Information concerning any given data file is stored in a directory file. The data base management system uses a relational data management approach. Presently three management schema are being developed for use with the data base. 5 figures.

  18. Mathematics Admission Test Remarks

    Directory of Open Access Journals (Sweden)

    Ideon Erge

    2016-12-01

    Full Text Available Since 2014, there have been admission tests in mathematics for applicants to the Estonian University of Life Sciences for Geodesy, Land Management and Real Estate Planning; Civil Engineering; Hydraulic Engineering and Water Pollution Control; Engineering and Technetronics curricula. According to admission criteria, the test must be taken by students who have not passed the specific mathematics course state exam or when the score was less than 20 points. The admission test may also be taken by those who wish to improve their state exam score. In 2016, there were 126 such applicants of whom 63 took the test. In 2015, the numbers were 129 and 89 and in 2014 150 and 47 accordingly. The test was scored on scale of 100. The arithmetic average of the score was 30.6 points in 2016, 29.03 in 2015 and 18.84 in 2014. The test was considered to be passed with 1 point in 2014 and 20 points in 2015 and 2016. We analyzed test results and gave examples of problems which were solved exceptionally well or not at all.

  19. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  20. Admission of new oncological drugs to the Slovenian health care system and their accessibility to the patients

    Directory of Open Access Journals (Sweden)

    Mitja Kos

    2007-09-01

    Full Text Available Background: The aim of the present study is to analyze the admission of anticancer drugs to the Slovenian healthcare system, and to evaluate patients’ accessibility to these medications.Methods: Admission and accessibility to anticancer drugs was evaluated by analysing: differences in registration time among USA, selected member states of EU, and Slovenia; time from the registration to the first use in Slovenia; differences between the first use in Slovenia and the first use in selected member states of EU and by analysing the market of oncology drugs. The study included drugs of the ATC groups such as Antitumor medications (cytostatics (ATC = L01 and Endocrine treatment (ATC = L02 that were used in Slovenia for the first time between 1999 to 2005. Registration data for Slovenia and EU was obtained from the registration documention of selected drugs at the Agency for Medicinal Products and Medical Devices of the Republic of Slovenia, and the European Agency for the Evaluation of Medicinal Products (EMEA. Registration data for USA was obtained from the registration documention of selected drugs at the Food and Drug Administration (FDA. The information upon the first use of drugs in Slovenia was acquired from the PharMIS system, and the information upon the first use of drugs in selected member states of EU was obtained from the study on patients’ access to oncology drugs by Nils Wilking and Bengt Jönsson, performed from 2005. Data for the market analysis of oncology drugs was obtained from the PharMIS system.Results: In previous years a delay in registration time between Slovenia and compared states was present for some oncology drugs. Along with the acceptance of Slovenia as a new member state of EU, on 1st May 2004, registration process in Slovenia became a part of the registration system of the European Agency for the Evaluation of Medicinal Products (EMEA. Majority of drugs had a time difference between the registration and the first use

  1. The optimal look-ahead policy for admission to a single server system

    NARCIS (Netherlands)

    Nawijn, W.M.

    1985-01-01

    This paper considers a service system with a single server, finite waiting room, and a renewal arrival process. Customers who arrive while the server is busy are lost. Upon completing service, the server chooses between two actions: either he immediately starts a new service, provided a customer is

  2. Look-ahead policies for admission to a single server loss system

    NARCIS (Netherlands)

    Nawijn, W.M.

    1990-01-01

    Consider a single server loss system in which the server, being idle, may reject or accept an arriving customer for service depending on the state at the arrival epoch. It is assumed that at every arrival epoch the server knows the service time of the arriving customer, the arrival time of the next

  3. Dynamic allocation and admission policies for QoS-aware provisioning systems

    DEFF Research Database (Denmark)

    Mazzucco, M.; Mazzara, M.; Dragoni, Nicola

    2013-01-01

    We present an architecture of a hosting system consisting of a set of hosted web services subject to QoS constraints, and a certain number of servers used to run user's demand. The traffic is session–based, while provider and users agree on SLAs specifying the expected level of service performance...

  4. The predictive validity of grade point average scores in a partial lottery medical school admission system

    NARCIS (Netherlands)

    Cohen-Schotanus, Janke; Muijtjens, Arno M. M.; Reinders, Jan J.; Agsteribbe, Jessica; van Rossum, Herman J. M.; van der Vleuten, Cees P. M.

    2006-01-01

    PURPOSE To ascertain whether the grade point average (GPA) of school-leaving examinations is related to study success, career development and scientific performance. The problem of restriction of range was expected to be partially reduced due to the use of a national lottery system weighted in

  5. 4GL ward management system.

    OpenAIRE

    Brandejs, J. F.

    1991-01-01

    After many years of extensive research of computerized information systems for nursing, inpatient care, clinics and HMOs, laboratories, diagnostic imaging, pharmacy and other services, an integrated Ward Patient Management system was developed. A mature, relational data base management system (RDBMS) ORACLE was selected as the design tool. The system is running under VMS, DOS and UNIX operating systems and ORACLE version 6 on nearly all computer platforms, although multiprocessors are preferr...

  6. Admissibility of logical inference rules

    CERN Document Server

    Rybakov, VV

    1997-01-01

    The aim of this book is to present the fundamental theoretical results concerning inference rules in deductive formal systems. Primary attention is focused on: admissible or permissible inference rules the derivability of the admissible inference rules the structural completeness of logics the bases for admissible and valid inference rules. There is particular emphasis on propositional non-standard logics (primary, superintuitionistic and modal logics) but general logical consequence relations and classical first-order theories are also considered. The book is basically self-contained and

  7. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  8. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  9. The Pattern of Surgical Admissions in University of Nigeria Teaching ...

    African Journals Online (AJOL)

    The digestive system and genitourinary systems were the most commonly affected systems. Emergency admission accounted for 18.1% of all surgical admissions while elective admissions accounted for the rest. Conclusion: More detailed research on the pattern of admissions is important in planning and should be carried ...

  10. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  11. ENVIRONMENTAL SYSTEMS MANAGEMENT AND SUSTAINABLE SYSTEMS THEORY

    Science.gov (United States)

    Environmental Systems Management is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects. This is importa...

  12. Cargo Data Management Demonstration System

    Science.gov (United States)

    1974-02-01

    Delays in receipt and creation of cargo documents are a problem in international trade. The work described demonstrates some of the advantages and capabilities of a computer-based cargo data management system. A demonstration system for data manageme...

  13. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  14. Dialogue Systems and Dialogue Management

    Science.gov (United States)

    2016-12-01

    system and user can take (McTear, 2002). FSM are archetypal handcrafted methods for dialogue management; they are developed solely through human...Natural language engineering, 6(3&4), pp. 323- 340. Lee, C., Jung , S., Eun, J., Jeong, M., & Lee, G. G. (2006). A situation-based dialogue management...72. IEEE. Lee, C., Jung , S., Kim, K., Lee, D., & Lee, G. G. (2010). Recent approaches to dialog management for spoken dialog systems. Journal of

  15. The association of renin–angiotensin system blockades and pneumonia requiring admission in patients with COPD

    Directory of Open Access Journals (Sweden)

    Kim J

    2016-09-01

    Full Text Available Junghyun Kim,1 Jung-Kyu Lee,2 Eun Young Heo,2 Hee Soon Chung,2 Deog Kyeom Kim2 1Department of Internal Medicine, Division of Pulmonary and Critical Care Medicine, Seoul National University Hospital, 2Department of Internal Medicine, Division of Pulmonary and Critical Care Medicine, Seoul Metropolitan Government-Seoul National University Boramae Medical Center, Seoul, Korea Background: The hallmark of COPD is chronic airway inflammation, which may be mediated by renin–angiotensin system. The renin–angiotensin system blockers such as angiotensin-converting enzyme inhibitors (ACEi and angiotensin II receptor blockers (ARBs have exhibited anti-inflammatory and immunomodulatory effects in patients with various diseases. We explored the effects of ACEi and ARBs on the risk of pneumonia in patients with COPD.Methods: A nested case–control study was performed on COPD patients recruited from January 2010 to August 2013 in two referral hospitals in Korea. A total of 130 COPD patients admitted with pneumonia were included, and 245 COPD patients without pneumonia were selected as controls from a total of 1,646 such patients. Controls were matched with test patients by age, sex, and severity of airflow limitation. The effects of ACEi/ARBs use on the odds ratio (OR for the development of pneumonia were tested through conditional logistic regression.Results: Elderly patients (over 70 years of age constituted ~30% of each group; most of the patients were male (85%. Of the COPD patients with pneumonia, 21.5% had taken ACEi/ARBs for a mean of 9.8 months (standard deviation ±3.5 months. The proportions of ACEi/ARBs users and the mean duration of such use did not differ when compared to those of the control patients (26.9%, P=0.25; 9.6±3.6 months, P=0.83. Univariate analyses indicated that the use of ACEi/ARBs was not associated with a decreased risk of pneumonia (OR =0.70, 95% confidence interval 0.41–1.23, P=0.21, whereas both a history of pulmonary

  16. IT Asset Management System -

    Data.gov (United States)

    Department of Transportation — ITAMS provides a web frontend for the managing of all HW Assets lifecycle data purchased by ATO since 2006. In addition it contains much of our Enterprise SW license...

  17. The predictive validity of grade point average scores in a partial lottery medical school admission system.

    Science.gov (United States)

    Cohen-Schotanus, Janke; Muijtjens, Arno M M; Reinders, Jan J; Agsteribbe, Jessica; van Rossum, Herman J M; van der Vleuten, Cees P M

    2006-10-01

    To ascertain whether the grade point average (GPA) of school-leaving examinations is related to study success, career development and scientific performance. The problem of restriction of range was expected to be partially reduced due to the use of a national lottery system weighted in favour of students with higher GPAs. We studied the students (n = 398) admitted to the Faculty of Medicine, University of Groningen, the Netherlands in 1982 and 1983. Data concerning drop-out and study progress were derived from the student administration. Data about career development were obtained from annual interviews with graduates (n = 318) between 1993 and 2000. Literature searches yielded data concerning scientific performance. Multiple linear regression and logistic regression were used to analyse the data. The variables 'gender' and 'cohort' and their interaction were included in the analyses to account for variation in the general level of the dependent variable and the effect of GPA on the dependent variable. GPA scores had no effect on drop-out rate. High GPA scores were associated with significantly less time to graduation, more chance of a preferred placement for specialist training and higher scientific output. GPA was not related to income. Gender differences were found for study duration and scientific output. Women graduated earlier and published less. The GPA of school-leaving examinations was found to be related to study success, career development and scientific performance. In this study the usual problem of restriction of range was shown to be absent. The weighted lottery procedure even resulted in an over-dispersion of candidates relative to the applicants. The resulting effect sizes were in agreement with those reported in other studies.

  18. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  19. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  20. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  1. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  2. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  3. The association of targeted temperature management at 33 and 36 °C with outcome in patients with moderate shock on admission after out-of-hospital cardiac arrest: a post hoc analysis of the Target Temperature Management trial.

    Science.gov (United States)

    Annborn, Martin; Bro-Jeppesen, John; Nielsen, Niklas; Ullén, Susann; Kjaergaard, Jesper; Hassager, Christian; Wanscher, Michael; Hovdenes, Jan; Pellis, Tommaso; Pelosi, Paolo; Wise, Matt P; Cronberg, Tobias; Erlinge, David; Friberg, Hans

    2014-09-01

    We hypothesized that a targeted temperature of 33 °C as compared to that of 36 °C would increase survival and reduce the severity of circulatory shock in patients with shock on admission after out-of-hospital cardiac arrest (OHCA). The recently published Target Temperature Management trial (TTM-trial) randomized 939 OHCA patients with no difference in outcome between groups and no difference in mortality at the end of the trial in a predefined subgroup of patients with shock at admission. Shock was defined as a systolic blood pressure of 30 min or the need of supportive measures to maintain a blood pressure ≥90 mmHg and/or clinical signs of end-organ hypoperfusion. In this post hoc analysis reported here, we further analyzed the 139 patients with shock at admission; all had been randomized to receive intervention at 33 °C (TTM33; n = 71) or 36 °C (TTM36; n = 68). Primary outcome was 180-day mortality. Secondary outcomes were intensive care unit (ICU) and 30-day mortality, severity of circulatory shock assessed by mean arterial pressure, serum lactate, fluid balance and the extended Sequential Organ Failure assessment (SOFA) score. There was no significance difference between targeted temperature management at 33 °C or 36 °C on 180-day mortality [log-rank test, p = 0.17, hazard ratio 1.33, 95 % confidence interval (CI) 0.88-1.98] or ICU mortality (61 vs. 44 %, p = 0.06; relative risk 1.37, 95 % CI 0.99-1.91). Serum lactate and the extended cardiovascular SOFA score were higher in the TTM33 group (p shock with targeted temperature management at 33 °C as compared to 36 °C in patients with shock on admission after OHCA.

  4. The CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Cinquilli, M. [CERN; Evans, D. [Fermilab; Foulkes, S. [Fermilab; Hufnagel, D. [Fermilab; Mascheroni, M. [CERN; Norman, M. [UC, San Diego; Maxa, Z. [Caltech; Melo, A. [Vanderbilt U.; Metson, S. [Bristol U.; Riahi, H. [INFN, Perugia; Ryu, S. [Fermilab; Spiga, D. [CERN; Vaandering, E. [Fermilab; Wakefield, Stuart [Imperial Coll., London; Wilkinson, R. [Caltech

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager), a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  5. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  6. BIMS: Biomedical Information Management System

    OpenAIRE

    Mora, Oscar; Bisbal, Jesús

    2013-01-01

    In this paper, we present BIMS (Biomedical Information Management System). BIMS is a software architecture designed to provide a flexible computational framework to manage the information needs of a wide range of biomedical research projects. The main goal is to facilitate the clinicians' job in data entry, and researcher's tasks in data management, in high data quality biomedical research projects. The BIMS architecture has been designed following the two-level modeling paradigm, a promising...

  7. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  8. The Systemic Inflammatory Response Syndrome (SIRS)--number and type of positive criteria predict interventions and outcomes in acute surgical admissions.

    Science.gov (United States)

    Stephenson, James A; Gravante, Gianpiero; Butler, Nicholas A; Sorge, Roberto; Sayers, Rob D; Bown, Matt J

    2010-11-01

    Systemic inflammatory response syndrome (SIRS) is a syndrome that reflects the widespread activation of inflammatory pathways. The goal of this study was to find whether the presence or absence of SIRS on emergency surgical admissions is related to the subsequent clinical outcome in terms of in-hospital interventions, length of stay, and mortality. The presence of SIRS at admission, final diagnosis of the underlying disease, treatments, and clinical outcomes were prospectively recorded for 1 month. Comparisons of interventions and outcomes were performed between SIRS+ vs. SIRS- patients. In patients with SIRS, the contribution of each positive criterion was evaluated with regards to mortality. A total of 179 patients were recruited. The prevalence of SIRS at admission was 35.2%. SIRS+ patients required less diagnostic procedures compared with SIRS- (28.6% vs. 34.5%) but had more therapeutic interventions (39.7% vs. 16.4%), surgical interventions (33.3% vs. 3.4%), intensive treatments (11.1% vs. 0.9%; p SIRS+ patients with four positive criteria had more surgical interventions, intensive treatments, and fatal outcomes compared with the others. Of importance the most influent factor was the respiratory rate followed by the white cell count and the heart rate/temperature. Patients with SIRS at admission apparently receive more interventions, have longer length of stay, and increased mortality than those patients without SIRS. These findings require separate validation in a larger cohort study.

  9. Congestion Management System Process Report

    Science.gov (United States)

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  10. System Wide Information Management (SWIM)

    Science.gov (United States)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  11. Fault management and systems knowledge

    Science.gov (United States)

    2016-12-01

    Pilots are asked to manage faults during flight operations. This leads to the training question of the type and depth of system knowledge required to respond to these faults. Based on discussions with multiple airline operators, there is agreement th...

  12. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  13. BIMS: Biomedical Information Management System

    OpenAIRE

    Mora Pérez, Oscar

    2009-01-01

    This final year project presents the design principles and prototype implementation of BIMS (Biomedical Information Management System), a flexible software system which provides an infrastructure to manage all information required by biomedical research projects.The BIMS project was initiated with the motivation to solve several limitations in medical data acquisition of some research projects, in which Universitat Pompeu Fabra takes part. These limitations,based on the lack of control mechan...

  14. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...... is developed consisting of 18 dimensions. Building on an enterprise case we argue that the interrelation between politics, competences and unpredictability is crucial. A maturity measurement tool for enterprises planning to implement enterprise systems is developed....

  15. CLASSIFICATION OF LEARNING MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Yu. B. Popova

    2016-01-01

    Full Text Available Using of information technologies and, in particular, learning management systems, increases opportunities of teachers and students in reaching their goals in education. Such systems provide learning content, help organize and monitor training, collect progress statistics and take into account the individual characteristics of each user. Currently, there is a huge inventory of both paid and free systems are physically located both on college servers and in the cloud, offering different features sets of different licensing scheme and the cost. This creates the problem of choosing the best system. This problem is partly due to the lack of comprehensive classification of such systems. Analysis of more than 30 of the most common now automated learning management systems has shown that a classification of such systems should be carried out according to certain criteria, under which the same type of system can be considered. As classification features offered by the author are: cost, functionality, modularity, keeping the customer’s requirements, the integration of content, the physical location of a system, adaptability training. Considering the learning management system within these classifications and taking into account the current trends of their development, it is possible to identify the main requirements to them: functionality, reliability, ease of use, low cost, support for SCORM standard or Tin Can API, modularity and adaptability. According to the requirements at the Software Department of FITR BNTU under the guidance of the author since 2009 take place the development, the use and continuous improvement of their own learning management system.

  16. Impact Management System

    Data.gov (United States)

    US Agency for International Development — IMS (developed w/Iraq mission) is a system for conducting quality portfolio impact analysis, linking projects to strategy through integration of context data. IMS...

  17. Automated Maintenance Management System -

    Data.gov (United States)

    Department of Transportation — To achieve the to-be state of a modernized supply chain infrastructure and the NextGen Mission Service Requirements, the System Information Modernization initiative...

  18. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  19. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  20. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  1. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  2. Influence of timing of admission in labour and management of labour on method of birth: results from a randomised controlled trial of caseload midwifery (COSMOS trial).

    Science.gov (United States)

    Davey, Mary-Ann; McLachlan, Helen L; Forster, Della; Flood, Margaret

    2013-12-01

    to explore the relationship between the degree to which labour is established on admission to hospital and method of birth. a recent randomised controlled trial found fewer caesarean sections (CS) in women allocated to caseload midwifery (19.4%) compared with standard care (24.9%). There is interest in exploring what specific aspects of the care might have resulted in this reduction. a large tertiary-level maternity service in Melbourne, Australia. English-speaking women with no previous caesarean section at low risk of complications in pregnancy were recruited to a randomised controlled trial. Trial participants whose management did not include a planned caesarean and who were admitted to hospital in spontaneous labour were included in this secondary analysis of trial data (n=1532). this secondary analysis included women admitted to hospital in spontaneous labour who were randomised to caseload midwifery compared with those randomised to standard care with regard to timing of admission in labour, augmentation of labour and use of epidural analgesia. In a further analysis randomised groups were pooled to examine predictors of caesarean section for first births only using multiple logistic regression. nulliparous women randomised to standard care were more likely to have labour augmented than those having caseload care (54.2% and 45.5% respectively, p=0.008), but were no more likely to use epidural analgesia. They were admitted earlier in labour, spending 1.1 hours longer than those in the caseload arm in hospital before the birth (p=0.003). Parous women allocated to standard care were more likely than those in the caseload arm to use epidural analgesia (10.0% and 5.3% respectively, p=0.047), but were no more likely to have labour augmented. They were also admitted earlier in labour, with a median cervical dilatation of 4 cm compared with 5 cm in the caseload arm (p=0.012). Pooling the two randomised groups of nulliparous women, and after adjusting for randomised

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  4. Management systems for service providers

    International Nuclear Information System (INIS)

    Bolokonya, Herbert Chiwalo

    2015-02-01

    In the field of radiation safety and protection there are a number of institutions that are involved in achieving different goals and strategies. These strategies and objectives are achieved based on a number of tools and systems, one of these tools and systems is the use of a management system. This study aimed at reviewing the management system concept for Technical Service Providers in the field of radiation safety and protection. The main focus was on personal monitoring services provided by personal dosimetry laboratories. A number of key issues were found to be prominent to make the management system efficient. These are laboratory accreditation, approval; having a customer driven operating criteria; and controlling of records and good reporting. (au)

  5. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  6. The JCMT Telescope Management System

    Science.gov (United States)

    Tilanus, Remo P. J.; Jenness, Tim; Economou, Frossie; Cockayne, Steve

    Established telescopes often face a challenge when trying to incorporate new software standards and utilities into their existing real-time control system. At the JCMT we have successfully added important new features such as a Relational Database (the Telescope Management System---TMS), an online data Archive, and WWW based utilities to an, in part, 10-year old system. The new functionality was added with remarkably few alterations to the existing system. We are still actively expanding and exploring these new capabilities.

  7. Management Information System & Computer Applications

    OpenAIRE

    Sreeramana Aithal

    2017-01-01

    The book contains following Chapters : Chapter 1 : Introduction to Management Information Systems, Chapter 2 : Structure of MIS, Chapter 3 : Planning for MIS, Chapter 4 : Introduction to Computers Chapter 5 : Decision Making Process in MIS Chapter 6 : Approaches for System Development Chapter 7 : Form Design Chapter 8 : Charting Techniques Chapter 9 : System Analysis & Design Chapter 10 : Applications of MIS in Functional Areas Chapter 11 : System Implement...

  8. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  9. The contribution of Ebola viral load at admission and other patient characteristics to mortality in a Médecins Sans Frontières (MSF) Ebola Case Management Centre (CMC), Kailahun, Sierra Leone, June -October, 2014.

    LENUS (Irish Health Repository)

    Fitzpatrick, Gabriel

    2015-05-22

    This paper describes patient characteristics, including Ebola viral load, associated with mortality in an MSF Ebola case management centre. Out of 780 admissions between June and October 2014, 525 (67%) were positive for Ebola with a known outcome. The crude mortality rate was 51% (270\\/525). Ebola viral load (whole blood sample) data was available on 76% (397\\/525) of patients. Univariate analysis indicated viral load at admission, age, symptom duration prior to admission and distance travelled to the CMC were associated with mortality (p value<0.05). The multivariable model predicted mortality in those with a viral load at admission greater than 10 million copies per millilitre (p value<0.05, Odds Ratio>10), aged 50 years or more (p value=0.08, Odds Ratio=2) and symptom duration prior to admission less than 5 days (p value=0.14). The presence of confusion, diarrhoea and conjunctivitis were significantly higher (p value<0.05) in Ebola patients who died. These findings highlight the importance viral load at admission has on mortality outcomes and could be used to cohort cases with viral loads greater than 10 million copies into dedicated wards with more intensive medical support to further reduce mortality.

  10. Biometric System Vulnerability as a Compromising Factor for Integrity of Chain of Custody and Admissibility ofDigitalEvidence in Court of Justice: Analysis and Improvement Proposal

    Directory of Open Access Journals (Sweden)

    Zoran Cosic

    2014-06-01

    Full Text Available Biometric systems play an important role in digital investigation process as a important factor of authentication and verification applications, since they are strongly linked to the holder of a biometric  traits  and  possible  suspect.  Thus  it  is  important  that  biometric  systems  can  be designed  to  withstand  attacks  when  employed  in  security-critical  applications,  especially  in unattended  remote  applications  such  as  energy  plants,  access  to  borders  at  airports,  ecommerce  etc.  Biometric  recognition  either  raises  important  legal  issues  of  remediation, authority,  and  reliability,  and,  of  course,  privacy.  The  standard  assumptions  of  the technologists  who  design  new  techniques,  capabilities,  and  systems  are  very  different  from those embedded in the legal  system.  Legal precedent on the  use of biometric technology is growing, with some key cases going back decades and other more recent cases having raised serious questions about the admissibility of biometric evidence in court. In this paper authors is about to explain influence of reliability of biometric system on general acceptance of digital evidence  in  Court  of  Justice  process.  Through  paper  authors  are  also  about  to  propose vulnerability assessment of biometric system as improvementfactor of reliability of existing methodology  for  preserving  chain  of  custody  of  digital  evidence  called  DEMF  (Digital Evidence Management Framework. Improvement proposal is presented as an introduction of phase  of  biometric  vulnerability  evaluation  methodology  within  proposedframework called APDEMF (Admissibility procedure of DEMF. Using UML (Universal Modeling Language modeling  methodology  authors  are  about  to  represent  a  APDEMF  framework  which  will describe essential phases of the same process.

  11. The association of targeted temperature management at 33 and 36 °C with outcome in patients with moderate shock on admission after out-of-hospital cardiac arrest

    DEFF Research Database (Denmark)

    Annborn, Martin; Bro-Jeppesen, John; Nielsen, Niklas

    2014-01-01

    Management trial (TTM-trial) randomized 939 OHCA patients with no difference in outcome between groups and no difference in mortality at the end of the trial in a predefined subgroup of patients with shock at admission. Shock was defined as a systolic blood pressure of 30 min or the need...... cardiovascular SOFA score were higher in the TTM33 group (p shock with targeted temperature management at 33 °C as compared to 36 °C in patients with shock on admission after OHCA.......PURPOSE: We hypothesized that a targeted temperature of 33 °C as compared to that of 36 °C would increase survival and reduce the severity of circulatory shock in patients with shock on admission after out-of-hospital cardiac arrest (OHCA). METHODS: The recently published Target Temperature...

  12. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  13. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  14. Campus Telephone Systems: Managing Change.

    Science.gov (United States)

    National Association of College and University Business Officers, Washington, DC.

    Issues facing a college or university that seeks to change its telephone system are raised in seven chapters. Major topics addressed by this resource guide are: telephone deregulation and changes in the telephone industry, the new technology available, how to manage a system, consultants, financing options, and institutional case studies. Specific…

  15. Managing Risk in Systems Development.

    Science.gov (United States)

    DePaoli, Marilyn M.; And Others

    Stanford University's use of a risk assessment methodology to improve the management of systems development projects is discussed. After examining the concepts of hazard, peril, and risk as they relate to the system development process, three ways to assess risk are covered: size, structure, and technology. The overall objective for Stanford…

  16. The CMS Data Management System

    CERN Document Server

    Giffels, M.; Kuznetsov, V; Magini, N; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Dataset Booking System (DBS), a metadata catalogue; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this presentation we will discuss the use of both Oracle and nonSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  17. Standard versus atrial fibrillation-specific management strategy (SAFETY) to reduce recurrent admission and prolong survival: pragmatic, multicentre, randomised controlled trial.

    Science.gov (United States)

    Stewart, Simon; Ball, Jocasta; Horowitz, John D; Marwick, Thomas H; Mahadevan, Gnanadevan; Wong, Chiew; Abhayaratna, Walter P; Chan, Yih K; Esterman, Adrian; Thompson, David R; Scuffham, Paul A; Carrington, Melinda J

    2015-02-28

    Patients are increasingly being admitted with chronic atrial fibrillation, and disease-specific management might reduce recurrent admissions and prolong survival. However, evidence is scant to support the application of this therapeutic approach. We aimed to assess SAFETY--a management strategy that is specific to atrial fibrillation. We did a pragmatic, multicentre, randomised controlled trial in patients admitted with chronic, non-valvular atrial fibrillation (but not heart failure). Patients were recruited from three tertiary referral hospitals in Australia. 335 participants were randomly assigned by computer-generated schedule (stratified for rhythm or rate control) to either standard management (n=167) or the SAFETY intervention (n=168). Standard management consisted of routine primary care and hospital outpatient follow-up. The SAFETY intervention comprised a home visit and Holter monitoring 7-14 days after discharge by a cardiac nurse with prolonged follow-up and multidisciplinary support as needed. Clinical reviews were undertaken at 12 and 24 months (minimum follow-up). Coprimary outcomes were death or unplanned readmission (both all-cause), measured as event-free survival and the proportion of actual versus maximum days alive and out of hospital. Analyses were done on an intention-to-treat basis. The trial is registered with the Australian New Zealand Clinical Trials Registry (ANZCTRN 12610000221055). During median follow-up of 905 days (IQR 773-1050), 49 people died and 987 unplanned admissions were recorded (totalling 5530 days in hospital). 127 (76%) patients assigned to the SAFETY intervention died or had an unplanned readmission (median event-free survival 183 days [IQR 116-409]) and 137 (82%) people allocated standard management achieved a coprimary outcome (199 days [116-249]; hazard ratio 0·97, 95% CI 0·76-1·23; p=0·851). Patients assigned to the SAFETY intervention had 99·5% maximum event-free days (95% CI 99·3-99·7), equating to a median

  18. Electromagnetic spectrum management system

    Science.gov (United States)

    Seastrand, Douglas R.

    2017-01-31

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  19. Electromagnetic spectrum management system

    Energy Technology Data Exchange (ETDEWEB)

    Seastrand, Douglas R.

    2017-10-17

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  20. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  1. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  2. Introduction to Management Information system

    OpenAIRE

    Mishra, Umakant

    2013-01-01

    A Management Information System (MIS) is a systematic organization and presentation of information that is generally required by the management of an organization for taking better decisions for the organization. The MIS data may be derived from various units of the organization or from other sources. However it is very difficult to say the exact structure of MIS as the structure and goals of different types of organizations are different. Hence both the data and structure of MIS is dependent...

  3. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. [Tennessee Univ., Knoxville, TN (United States)

    1992-08-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  4. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. (Tennessee Univ., Knoxville, TN (United States))

    1992-01-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  5. Intentional systems management: managing forests for biodiversity.

    Science.gov (United States)

    A.B. Carey; B.R. Lippke; J. Sessions

    1999-01-01

    Conservation of biodiversity provides for economic, social, and environmental sustainability. Intentional management is designed to manage conflicts among groups with conflicting interests. Our goal was to ascertain if intentional management and principles of conservation of biodiversity could be combined into upland and riparian forest management strategies that would...

  6. Management of complex dynamical systems

    Science.gov (United States)

    MacKay, R. S.

    2018-02-01

    Complex dynamical systems are systems with many interdependent components which evolve in time. One might wish to control their trajectories, but a more practical alternative is to control just their statistical behaviour. In many contexts this would be both sufficient and a more realistic goal, e.g. climate and socio-economic systems. I refer to it as ‘management’ of complex dynamical systems. In this paper, some mathematics for management of complex dynamical systems is developed in the weakly dependent regime, and questions are posed for the strongly dependent regime.

  7. The CMS data management system

    International Nuclear Information System (INIS)

    Giffels, M; Magini, N; Guo, Y; Kuznetsov, V; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  8. The CMS Data Management System

    Science.gov (United States)

    Giffels, M.; Guo, Y.; Kuznetsov, V.; Magini, N.; Wildish, T.

    2014-06-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  9. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Hansen, Michael Fiil

    2006-01-01

    The ERP journey has taken us beyond implementation, into the second wave of ERP. One interesting question in this second wave is how the ERP system is managed and what role the ERP system plays in the organization after some years of implementation. These questions are addressed in this paper....... In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  10. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Fill, Michael; Simonsen, Martin

    2007-01-01

    The ERP journey has taken us beyond implementation, into the second wave of ERP. One interesting question in this second wave is how the ERP system is managed and what role the ERP system plays in the organization after some years of implementation. These questions are addressed in this paper....... In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  11. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  12. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  13. The SMAP Dictionary Management System

    Science.gov (United States)

    Smith, Kevin A.; Swan, Christoper A.

    2014-01-01

    The Soil Moisture Active Passive (SMAP) Dictionary Management System is a web-based tool to develop and store a mission dictionary. A mission dictionary defines the interface between a ground system and a spacecraft. In recent years, mission dictionaries have grown in size and scope, making it difficult for engineers across multiple disciplines to coordinate the dictionary development effort. The Dictionary Management Systemaddresses these issues by placing all dictionary information in one place, taking advantage of the efficiencies inherent in co-locating what were once disparate dictionary development efforts.

  14. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  15. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  16. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  17. Thermal management systems and methods

    Science.gov (United States)

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  18. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  19. Information system revives materials management

    International Nuclear Information System (INIS)

    Hansen, T.

    1995-01-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD)

  20. Systems approach in energy management

    International Nuclear Information System (INIS)

    Dutta-Choudhury, K.

    1993-01-01

    Several years ago when the author was working in the chemicals division of a paper company in Instrumentation and Controls, one experience had a lasting impact on his work approach which is systems approach. The maintenance manager told the author that a very important piece of boiler instrument of the power plant had broken down and delivery of the replacement needed to be expedited. The instrument was ordered over the phone in another city. The purchase order was personally delivered at the supplier's office and arrangements were made so the instrument was put on the next flight. A week later the maintenance manager indicated that the particular instrument still had not arrived in the plant and he could not run the power plant. Thus the company incurred substantial losses. Further inquiries showed that the instrument did indeed arrive at the plant stores on time. But, in the absence of any instructions thereon, the instrument was not delivered to the power plant. The sense of urgency was lost in the existing delivery process. In other words, the process or system failed. The whole process from requisitioning to delivery of ordered items was analyzed and corrective procedures were incorporated to prevent future repetitions. This brings up the subject of systems approach in engineering management in general and energy management in particular. This involves defining an objective and designing a system for an effective way of getting there

  1. Grenada Education Management Information System

    OpenAIRE

    Porta, Emilio; Klein, Jennifer; Arcia, Gustavo; Nannyonjo, Harriet

    2012-01-01

    The Education Management Information System (EMIS) country report for Grenada includes the following headings: background which includes education data in Grenada, EMIS staff, facilities and equipment, EMIS data, and publications; prerequisites of quality; assurances of integrity; methodological soundness; accuracy and reliability; serviceability; and accessibility.

  2. Security ManagementSystems Approach

    Directory of Open Access Journals (Sweden)

    Milan Kný

    2015-12-01

    Full Text Available The aim of the contribution is the use of the systems approach to treat security management as a practical field and new scientific discipline. The philosophy of systems approach to the solution of problems generally is an adequate methodological basis even for the theory of management. The path to the real optimization of security situation leads only through the holistic and solid solution. Applications of systems analysis and synthesis back up the fact, that systems approach and systems thinking should not absent in security objects. The truthfulness of the claim, that security management is a well-established discipline, depends on ongoing discussion that represents useful process of development of new scientific discipline. At the same time the rationality of science and systematism works as a counterbalance to irrational fear of the whole society, too. Which questions of security remain open in relation to „our interests“? Current problems of Europe should be solved systematically. It is necessary to define the space of interest (territorially the border of the EU or the Schengen area, to implement the system to the object with respect to the borders of the space, to specify the structure and subjects of decision making and implementation.

  3. OSPACS: Ultrasound image management system

    Directory of Open Access Journals (Sweden)

    Bessant Conrad

    2008-06-01

    Full Text Available Abstract Background Ultrasound scanning uses the medical imaging format, DICOM, for electronically storing the images and data associated with a particular scan. Large health care facilities typically use a picture archiving and communication system (PACS for storing and retrieving such images. However, these systems are usually not suitable for managing large collections of anonymized ultrasound images gathered during a clinical screening trial. Results We have developed a system enabling the accurate archiving and management of ultrasound images gathered during a clinical screening trial. It is based upon a Windows application utilizing an open-source DICOM image viewer and a relational database. The system automates the bulk import of DICOM files from removable media by cross-validating the patient information against an external database, anonymizing the data as well as the image, and then storing the contents of the file as a field in a database record. These image records may then be retrieved from the database and presented in a tree-view control so that the user can select particular images for display in a DICOM viewer or export them to external media. Conclusion This system provides error-free automation of ultrasound image archiving and management, suitable for use in a clinical trial. An open-source project has been established to promote continued development of the system.

  4. Automated Car Park Management System

    Science.gov (United States)

    Fabros, J. P.; Tabañag, D.; Espra, A.; Gerasta, O. J.

    2015-06-01

    This study aims to develop a prototype for an Automated Car Park Management System that will increase the quality of service of parking lots through the integration of a smart system that assists motorist in finding vacant parking lot. The research was based on implementing an operating system and a monitoring system for parking system without the use of manpower. This will include Parking Guidance and Information System concept which will efficiently assist motorists and ensures the safety of the vehicles and the valuables inside the vehicle. For monitoring, Optical Character Recognition was employed to monitor and put into list all the cars entering the parking area. All parking events in this system are visible via MATLAB GUI which contain time-in, time-out, time consumed information and also the lot number where the car parks. To put into reality, this system has a payment method, and it comes via a coin slot operation to control the exit gate. The Automated Car Park Management System was successfully built by utilizing microcontrollers specifically one PIC18f4550 and two PIC16F84s and one PIC16F628A.

  5. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  6. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  7. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  8. Metrics for border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  9. MIMS - MEDICAL INFORMATION MANAGEMENT SYSTEM

    Science.gov (United States)

    Frankowski, J. W.

    1994-01-01

    MIMS, Medical Information Management System is an interactive, general purpose information storage and retrieval system. It was first designed to be used in medical data management, and can be used to handle all aspects of data related to patient care. Other areas of application for MIMS include: managing occupational safety data in the public and private sectors; handling judicial information where speed and accuracy are high priorities; systemizing purchasing and procurement systems; and analyzing organizational cost structures. Because of its free format design, MIMS can offer immediate assistance where manipulation of large data bases is required. File structures, data categories, field lengths and formats, including alphabetic and/or numeric, are all user defined. The user can quickly and efficiently extract, display, and analyze the data. Three means of extracting data are provided: certain short items of information, such as social security numbers, can be used to uniquely identify each record for quick access; records can be selected which match conditions defined by the user; and specific categories of data can be selected. Data may be displayed and analyzed in several ways which include: generating tabular information assembled from comparison of all the records on the system; generating statistical information on numeric data such as means, standard deviations and standard errors; and displaying formatted listings of output data. The MIMS program is written in Microsoft FORTRAN-77. It was designed to operate on IBM Personal Computers and compatibles running under PC or MS DOS 2.00 or higher. MIMS was developed in 1987.

  10. The LHCb Data Management System

    International Nuclear Information System (INIS)

    Baud, J P; Charpentier, Ph; Ciba, K; Lanciotti, E; Màthè, Z; Graciani, R; Remenska, D; Santana, R

    2012-01-01

    The LHCb Data Management System is based on the DIRAC Grid Community Solution. LHCbDirac provides extensions to the basic DMS such as a Bookkeeping System. Datasets are defined as sets of files corresponding to a given query in the Bookkeeping system. Datasets can be manipulated by CLI tools as well as by automatic transformations (removal, replication, processing). A dynamic handling of dataset replication is performed, based on disk space usage at the sites and dataset popularity. For custodial storage, an on-demand recall of files from tape is performed, driven by the requests of the jobs, including disk cache handling. We shall describe the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behavior of LHCb Storage capacity.

  11. Normative engineering risk management systems

    International Nuclear Information System (INIS)

    Regan, P.J.; Pate-Cornell, M.E.

    1997-01-01

    This paper describes the design of a normative engineering risk management system that performs four activities: diagnosis, dynamic evolution, decision making, and information gathering. The problem domain can be represented as a partially-observable Markov decision process (POMDP). By decomposing the POMDP into a separate model for each of the four activities, the system enables highly asymmetric models to be tailored to a particular situation. Our goal is to construct a normative system that creates an accurate, concise decision model and that provides timely, reliable results. Conserved model components are constructed at design time whereas unique features are customized at run time. For run-time model components, human guidance is used sparingly to refine the decision model. Customized asymmetry is most extreme for information gathering. An application to the management of fire risks on board offshore oil platforms, with particular emphasis on gas leaks, illustrates the concepts

  12. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  13. Radiology information management system, TOSRIM

    Energy Technology Data Exchange (ETDEWEB)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito (Toshiba Corp., Kawasaki, Kanagawa (Japan))

    1991-02-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author).

  14. Radiology information management system, TOSRIM

    International Nuclear Information System (INIS)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito

    1991-01-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author)

  15. The Cheetah data management system

    International Nuclear Information System (INIS)

    Kunz, P.F.; Word, G.B.

    1992-09-01

    Cheetah is a data management system based on the C programming language, with support for other languages. Its main goal is to transfer data between memory and I/O steams in a general way. The streams are either associated with disk files or are network data stems. Cheetah provides optional convenience functions to assist in the management of C structures. Cheetah steams are self-describing so that general purpose applications can fully understand an incoming steam. This information can be used to display the data in an incoming steam to the user of an interactive general application, complete with variable names and optional comments

  16. ISO 14000 : environmental management systems

    International Nuclear Information System (INIS)

    Boutin, C.; Emard, C.; Lalonde, G.; Levesque, A.; Robitaille, R.; Rollin, A.L.; Thibeault, I.

    1996-01-01

    This book is addressed to the managers, professionals, and government agents which wish to know the philosophy of the step as well as the stages to be followed for the establishment of a system of environmental management in conformity with the standards of the series ISO 14000. This work locates ISO 14000 in the historical context of its development by describing the bonds with other standards in place of which those of the series ISO 9000. This book answers questions that arise regarding a companies step toward accreditation to ISO 14000

  17. Spatial Data Management System (SDMS)

    Science.gov (United States)

    Hutchison, Mark W.

    1994-01-01

    The Spatial Data Management System (SDMS) is a testbed for retrieval and display of spatially related material. SDMS permits the linkage of large graphical display objects with detail displays and explanations of its smaller components. SDMS combines UNIX workstations, MIT's X Window system, TCP/IP and WAIS information retrieval technology to prototype a means of associating aggregate data linked via spatial orientation. SDMS capitalizes upon and extends previous accomplishments of the Software Technology Branch in the area of Virtual Reality and Automated Library Systems.

  18. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  19. OSH management systems in enterprises

    Directory of Open Access Journals (Sweden)

    B. Kalandyk

    2010-04-01

    Full Text Available Nowadays, in modern companies and enterprises, safety means much more than only the evaluation of risk and analysis of accidents. Theactivities in the area of the occupational health and safety should form an integral part of the enterprise management system. According toa framework directive no 89/391/EEC the EU member states are obliged to implement standards related with the occupational health andsafety systems. The standard most popular and used most commonly, as applicable to enterprises of any type, is the international OHSAS18001 system and in Poland Polish Standards PN-N-18001.

  20. Decline in adolescent treatment admissions for methamphetamine ...

    African Journals Online (AJOL)

    Background and objectives. The purpose of this report is to describe the changing trends in adolescent treatment admissions for methamphetamine in Cape Town, and to discuss possible implications. Method. Data were collected on admissions for drug abuse treatment through a regular monitoring system involving drug ...

  1. Lexical Profiles of Thailand University Admission Tests

    Science.gov (United States)

    Cherngchawano, Wirun; Jaturapitakkul, Natjiree

    2014-01-01

    University Admission Tests in Thailand are important documents which reflect Thailand's education system. To study at a higher education level, all students generally need to take the University Admission Tests designed by the National Institute of Educational Testing Service (NIETS). For the English test, vocabulary and reading comprehension is…

  2. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  3. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  4. International safeguards data management system

    International Nuclear Information System (INIS)

    Argentesi, F.; Costantini, L.; Franklin, M.; Dondi, M.G.

    1981-01-01

    The data base management system ''ISADAM'' (i.e. International Safeguards Data Management System) described in this report is intended to facilitate the safeguards authority in making efficient and effective use of accounting reports. ISADAM has been developed using the ADABAS data base management system and is implemented on the JRC-Ispra computer. The evaluation of safeguards declarations focuses on three main objectives: - the requirement of syntactical consistency with the legal conventions of data recording for safeguards accountancy; - the requirement of accounting evidence that there is no material unaccounted for (MUF); - the requirement of semantic consistency with the technological characteristics of the plant and the processing plans of the operator. Section 2 describes in more detail the facilities which ISADAM makes available to a safeguards inspector. Section 3 describes how the MUF variance computation is derived from models of measurement error propagation. Many features of the ISADAM system are automatically provided by ADABAS. The exceptions to this are the utility software designed to: - screen plant declarations before loading into the data base, - prepare variance summary files designed to support real-time computation of MUF and variance of MUF, - provide analyses in response to user requests in interactive or batch mode. Section 4 describes the structure and functions of this software which have been developed by JRC-Ispra

  5. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  6. The European positional paper on rhinosinusitis and nasal polyps: has the introduction of guidance on the management of sinus disease affected uptake of surgery and acute admissions for sinusitis?

    Science.gov (United States)

    Cosway, Ben; Tomkinson, Alun; Owens, David

    2013-03-01

    Rhinosinusitis is a common condition with adults experiencing 2-5 episodes per year. The European Positional Paper on Rhinosinusitis and Nasal Polyps (EP3OS) published in 2005 and updated in 2007 provided evidence-based guidelines on the management of sinus disease promoting a conservative approach to treatment. This study examines the effect of EP3OS on sinus surgery uptake and acute admissions for sinusitis in England and Wales. A retrospective study using the national electronic health databases of England (Hospital Episodes Statistics, HES online) and Wales (Patient Episodes Database of Wales, PEDW) was undertaken from 2000 to 2010 using the OPCS-4 codes E12-E17 (sinus surgery) and ICD10 code J01 (acute admission for sinusitis). Data were analysed for effect following the introduction of the EP3OS in 2005 using linear regression and Chi squared analysis. 116,370 sinus procedures and 10,916 acute admissions for sinusitis were made during the study period. No significant decrease in sinus surgery procedures occurred following the introduction of the EP3OS as may have been expected (p > 0.05), although subgroup analysis suggested a significant increase in Wales (p introduction of EP3OS (p 0.05). The EP3OS appears to have had little impact on the rates of sinus surgery but more conservative approaches to managing of sinus disease may have led to an increase in acute admissions. Further research is required to investigate whether changes in practice were adopted.

  7. Knowledge management systems in practice

    DEFF Research Database (Denmark)

    Tørning, Kristian

    is to directly seek to change the user's behavior, i.e., persuading more knowledge sharing. The main contribution is an indication of an anomaly with regards to the strategic approach towards knowledge management, where knowledge sharing is seen as an effort by which companies can gain a competitive advantage......This dissertation contributes to the existing body of knowledge on how we design computer systems, particularly multiuser software for knowledge sharing and creation in globally diffused companies. This is achieved by conducting a work place study of a global industrial engineering conglomerate...... which has the strategy of working with knowledge in the form of "best practices" meant to boost performance. The thesis explores the situation that workers are in, since they are meant to share and develop "best practices" knowledge in a portal based Knowledge Management System (KMS). The study...

  8. ISO 9001 quality management systems

    CERN Document Server

    Natarajan, Dhanasekharan

    2017-01-01

    This book explains the requirements of ISO 9001 for establishing quality management system (QMS) for an organization. The requirements are illustrated with examples from industries for understanding the requirements and preparing the documents of QMS with high clarity. Methods of integrating ISO 9001 requirements with enterprise resource planning (ERP) software are presented. The software integrated approach enables process owners to focus on their core tasks of achieving the planned outputs of processes and the software generates quality records automatically.

  9. ISO 9000 Quality Management System

    Science.gov (United States)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  10. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  11. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  12. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  13. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  14. Treatment Episode Data Set: Admissions (TEDS-A-1994)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  15. Treatment Episode Data Set: Admissions (TEDS-A-2002)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  16. Treatment Episode Data Set: Admissions (TEDS-A-2006)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  17. Treatment Episode Data Set: Admissions (TEDS-A-1999)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  18. Treatment Episode Data Set: Admissions (TEDS-A-2003)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  19. Treatment Episode Data Set: Admissions (TEDS-A-1997)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  20. Treatment Episode Data Set: Admissions (TEDS-A-2000)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  1. Treatment Episode Data Set: Admissions (TEDS-A-2005)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  2. Treatment Episode Data Set: Admissions (TEDS-A-2008)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  3. Treatment Episode Data Set: Admissions (TEDS-A-2004)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  4. Treatment Episode Data Set: Admissions (TEDS-A-2001)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  5. Treatment Episode Data Set: Admissions (TEDS-A-2013)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  6. Treatment Episode Data Set: Admissions (TEDS-A-1993)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  7. Treatment Episode Data Set: Admissions (TEDS-A-2010)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  8. Treatment Episode Data Set: Admissions (TEDS-A-2009)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  9. Treatment Episode Data Set: Admissions (TEDS-A-1995)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  10. Treatment Episode Data Set: Admissions (TEDS-A-1992)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  11. Treatment Episode Data Set: Admissions (TEDS-A-2011)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  12. Treatment Episode Data Set: Admissions (TEDS-A-2007)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  13. Treatment Episode Data Set: Admissions (TEDS-A-2012)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  14. Treatment Episode Data Set: Admissions (TEDS-A-1998)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  15. Treatment Episode Data Set: Admissions (TEDS-A-1996)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  16. Integrated Building Management System (IBMS)

    Energy Technology Data Exchange (ETDEWEB)

    Anita Lewis

    2012-07-01

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  17. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  18. Combat Agility Management System (CAMS)

    Science.gov (United States)

    Skow, Andrew; Porada, William

    1994-01-01

    The proper management of energy becomes a complex task in fighter aircraft which have high angle of attack (AOA) capability. Maneuvers at high AOA are accompanied by high bleed rates (velocity decrease), a characteristic that is usually undesirable in a typical combat arena. Eidetics has developed under NASA SBIR Phase 1 and NAVAIR SBIR Phase 2 contracts a system which allows a pilot to more easily and effectively manage the trade-off of energy (airspeed or altitude) for turn rate while not imposing hard limits on the high AOA nose pointing capability that can be so important in certain air combat maneuver situations. This has been accomplished by incorporating a two-stage angle of attack limiter into the flight control laws. The first stage sets a limit on AOA to achieve a limit on the maximum bleed rate (selectable) by limiting AOA to values which are dependent on the aircraft attitude and dynamic pressure (or flight path, velocity, and altitude). The second stage sets an AOA limit near the AOA for C(sub l max). One of the principal benefits of such a system is that it enables a low-experience pilot to become much more proficient at managing his energy. The Phase 2 simulation work is complete, and an exploratory flight test on the F-18 HARV is planned for the Fall of 1994 to demonstrate/validate the concept.

  19. TRAMWAY MANAGEMENT SYSTEM IN INDONESIA

    Directory of Open Access Journals (Sweden)

    Melia Damayanti

    2015-01-01

    Full Text Available Tramway systems, which can carry more passengers than buses at one haul, are now being proposed to meet Indonesia’s public transport requirement. The objective of this research is to analyze the management structures for operating tram in different countries and then propose a suitable organizational structure for operating trams, if re-introduced, in Indonesia. The author chose France (Montpellier tramway, Germany (Karlsruhe tram-train and the UK (Nottingham Express Transit as the role model countries for investigation. From the analysis, the most appropriate organizational structure and suitable tramway management structure for operating tramways implementation in Indonesia. The key features of the research are to establish public transport company by local government to manage all public transport systems, propose tramway construction and operation to exist as separate departments under the tramway team division of the public company, recommend the public transport company to have responsibility for overseeing construction of the trams, operating, and maintaining the trams, suggest local government to own them and have responsibility for tramway strategic policy, control regulation as well as supervision and coordination of the performance of the public transport company, propose joint working between public and private sectors.

  20. Exploring unplanned ICU admissions: a systematic review.

    Science.gov (United States)

    Vlayen, Annemie; Verelst, Sandra; Bekkering, Geertruida E; Schrooten, Ward; Hellings, Johan; Claes, Nerée

    2011-01-01

    Adverse events are unintended patient injuries or complications that arise from healthcare management resulting in death, disability or prolonged hospital stay. Adverse events that require critical care are a considerable financial burden to the healthcare system. Medical record review seems to be a reliable method for detecting adverse events. To synthesize the best available evidence regarding the estimates of the incidence and preventability of adverse events that necessitate intensive care admission; to determine the type and consequences (patient harm, mortality, length of ICU stay and direct medical costs) of these adverse events. MEDLINE (from 1966 to present), EMBASE (from 1974 to present) and CENTRAL (version 1-2010) were searched for studies reporting on unplanned admissions to intensive care units (ICUs). Databases of reports, conference proceedings, grey literature, ongoing research, relevant patient safety organizations and two journals were searched for additional studies. Reference lists of retrieved papers were searched and authors were contacted in an attempt to find any further published or unpublished work. Only quantitative studies that used chart review for the detection of adverse events requiring intensive care admission were considered for eligibility. Studies that were published in the English, Dutch, German, French or Spanish language were included. Two reviewers independently extracted data and assessed the methodological quality of the included studies. 28 studies in the English language and one study in French were included. Of these, two were considered duplicate publications and therefore 27 studies were reviewed. Meta-analysis of the data was not appropriate due to statistical heterogeneity between studies; therefore, results are presented in a descriptive way. Studies were categorized according to the population and the providers of care. 1) The majority of the included studies investigated unplanned intensive care admissions after

  1. Validation of APACHE II scoring system at 24 hours after admission as a prognostic tool in urosepsis: A prospective observational study

    Directory of Open Access Journals (Sweden)

    Sundaramoorthy VijayGanapathy

    2017-11-01

    Full Text Available Purpose: Urosepsis implies clinically evident severe infection of urinary tract with features of systemic inflammatory response syndrome (SIRS. We validate the role of a single Acute Physiology and Chronic Health Evaluation II (APACHE II score at 24 hours after admission in predicting mortality in urosepsis. Materials and Methods: A prospective observational study was done in 178 patients admitted with urosepsis in the Department of Urology, in a tertiary care institute from January 2015 to August 2016. Patients >18 years diagnosed as urosepsis using SIRS criteria with positive urine or blood culture for bacteria were included. At 24 hours after admission to intensive care unit, APACHE II score was calculated using 12 physiological variables, age and chronic health. Results: Mean±standard deviation (SD APACHE II score was 26.03±7.03. It was 24.31±6.48 in survivors and 32.39±5.09 in those expired (p<0.001. Among patients undergoing surgery, mean±SD score was higher (30.74±4.85 than among survivors (24.30±6.54 (p<0.001. Receiver operating characteristic (ROC analysis revealed area under curve (AUC of 0.825 with cutoff 25.5 being 94.7% sensitive and 56.4% specific to predict mortality. Mean±SD score in those undergoing surgery was 25.22±6.70 and was lesser than those who did not undergo surgery (28.44±7.49 (p=0.007. ROC analysis revealed AUC of 0.760 with cutoff 25.5 being 94.7% sensitive and 45.6% specific to predict mortality even after surgery. Conclusions: A single APACHE II score assessed at 24 hours after admission was able to predict morbidity, mortality, need for surgical intervention, length of hospitalization, treatment success and outcome in urosepsis patients.

  2. Hospice Admission Assessment.

    Science.gov (United States)

    Moon, Paul J

    2017-04-01

    Hospice admission assessment is a pivotal encounter for patient/family and hospice representative. For patient/family, the admission is the threshold by which a particular level of care can commence and, symbolically, a certain marker in health status trajectory is reached. For hospice representative, the admission episode is an occasion to inaugurate an ambience that can serve to frame future hospice care experiences for the patient/family. Through a narrative lens, hospice admission assessment can be seen as experiential time and space, where patient's and family's stories are mindfully and deliberately witnessed and explored. Through the practice of narrative mining, the hospice representative can better understand others' offered stories of reality, which will better inform the plan of palliation and hospice care.

  3. Management of Hotel Dining Information System

    OpenAIRE

    Liu, Fangyi

    2010-01-01

    Dining hotel management is more completed, more accurately, and effectively method for hotel and dining industries. It is an application based on modern hotel market. The information management system is already widely used in many fields at moment. Nowadays, with the dining hotel industries development, an advanced and scientific management system that could be more detailed and secure is needed. Hotel Dining Management system is extremely practical in the present hotel industry dining manag...

  4. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  5. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  6. Nonimmigrant Admissions: Fiscal Year 2010

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  7. Nonimmigrant Admissions - Fiscal Year 2013

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  8. Nonimmigrant Admissions: Fiscal Year 2016

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  9. Nonimmigrant Admissions: Fiscal Year 2011

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  10. Nonimmigrant Admissions: Fiscal Year 2004

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  11. Nonimmigrant Admissions: Fiscal Year 2014

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  12. Nonimmigrant Admissions: Fiscal Year 2005

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  13. Nonimmigrant Admissions: Fiscal Year 2012

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  14. Nonimmigrant Admissions: Fiscal Year 2015

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  15. Nonimmigrant Admissions: Fiscal Year 2009

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  16. Nonimmigrant Admissions: Fiscal Year 2008

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  17. Nonimmigrant Admissions: Fiscal Year 2006

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  18. Nonimmigrant Admission: Fiscal Year 2007

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  19. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  20. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  1. A rural transit asset management system

    Science.gov (United States)

    2005-01-01

    This reports the research undertaken to create an interactive, geographic information system based asset management system for the Alabama Department of Transportation to manage vehicles purchased and operated through Section 5310 and 5311 federal gr...

  2. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...... Ferreira and Otley’s (2009) conceptual and holistic framework for performance management systems, supplemented by elements of contextual factors and organisational culture. Further, selected researchers’ perceptions of the purpose of using management control systems are related to practitioners’ ideas...

  3. Electricity pricing and management systems

    International Nuclear Information System (INIS)

    Sawal, D.M.; Bajapai, Ashok

    1997-01-01

    The installed capacity of power generation in India is at present 80,000 MW. Out of the total 5.79 lakh inhabitated villages in the country, 4.79 villages have been electrified so far. Total number of consumers of electricity are about 95 million in the country. For such a large country with population of over 900 million and area of 32.873 lakh sq. kms., the role of electricity pricing and management system of the power sector is of paramount importance

  4. Environmental Management System ISO 14001

    CERN Document Server

    Haider, Syed

    2010-01-01

    This is a must-have tool for any company in the process of adopting and incorporating the ISO 14001:2004 requirements, this book and accompanying CD-ROM provides the latest updates and amendments and translates the ISO language into actionable strategy. Offering administrative solutions to managers of all sorts, it includes practical examples of policies with objectives, targets, and action plans applicable to any process related industry or an ordinary organization. With template formats and hands-on flow charts to describe step-by-step system development, documentation, and implementation ph

  5. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  6. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  7. An admissions system to select veterinary medical students with an interest in food animals and veterinary public health.

    Science.gov (United States)

    Haarhuis, Jan C M; Muijtjens, Arno M M; Scherpbier, Albert J J A; van Beukelen, Peter

    2009-01-01

    Interest in the areas of food animals (FA) and veterinary public health (VPH) appears to be declining among prospective students of veterinary medicine. To address the expected shortage of veterinarians in these areas, the Utrecht Faculty of Veterinary Medicine has developed an admissions procedure to select undergraduates whose aptitude and interests are suited to these areas. A study using expert meetings, open interviews, and document analysis identified personal characteristics that distinguished veterinarians working in the areas of FA and VPH from their colleagues who specialized in companion animals (CA) and equine medicine (E). The outcomes were used to create a written selection tool. We validated this tool in a study among undergraduate veterinary students in their final (sixth) year before graduation. The applicability of the tool was verified in a study among first-year students who had opted to pursue either FA/VPH or CA/E. The tool revealed statistically significant differences with acceptable effect sizes between the two student groups. Because the written selection tool did not cover all of the differences between the veterinarians who specialized in FA/VPH and those who specialized in CA/E, we developed a prestructured panel interview and added it to the questionnaire. The evaluation of the written component showed that it was suitable for selecting those students who were most likely to succeed in the FA/VPH track.

  8. Information management system for KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie [Korea Electric Power Corporation, Seoul (Korea, Republic of); Park, Jaemoon [Korea Power Engineering Co., Inc., Daejeon (Korea, Republic of)

    1996-04-15

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III.

  9. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  10. Microcomputer Database Management Systems for Bibliographic Data.

    Science.gov (United States)

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  11. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  12. Transition Office Management and Accounting System

    Data.gov (United States)

    US Agency for International Development — TOMAS combined over 20 previously separate systems into one fully integrated management system covering budget, finance, procurement, travel, and emergency contact...

  13. Ground Enterprise Management System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Emergent Space Technologies Inc. proposes to develop the Ground Enterprise Management System (GEMS) for spacecraft ground systems. GEMS will provide situational...

  14. Pattern of non-communicable diseases among medical admissions ...

    African Journals Online (AJOL)

    Medical admissions due to non-communicable diseases were carefully selected and analyzed. There were 1853 cases of various non-communicable diseases out of a total medical admission of 3294 constituting 56.2% of total medical admissions. Diseases of the cardiovascular, endocrine and renal systems were the most ...

  15. Systems Engineering Management and the Relationship of Systems Engineering to Project Management and Software Engineering (presentation)

    OpenAIRE

    Boehm, Barry; Conrow, Ed; Madachy, Ray; Nidiffer, Ken; Roedler, Garry

    2010-01-01

    Prepared for the 13th Annual NDIA Systems Engineering Conference October 28, 2010, “Achieving Acquisition Excellence Via Effective Systems Engineering”. Panel: Systems Engineering Management and the Relationship of Systems Engineering to Project Management and Software Engineering

  16. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  17. A System Architecture for Autonomous Demand Side Load Management in Smart Buildings

    DEFF Research Database (Denmark)

    Costanzo, Giuseppe Tommaso; Zhu, Guchuan; Anjos, Miguel F.

    2012-01-01

    This paper presents a system architecture for load management in smart buildings which enables autonomous demand side load management in the smart grid. Being of a layered structure composed of three main modules for admission control, load balancing, and demand response management......, this architecture can encapsulate the system functionality, assure the interoperability between various components, allow the integration of different energy sources, and ease maintenance and upgrading. Hence it is capable of handling autonomous energy consumption management for systems with heterogeneous dynamics...... in multiple time-scales and allows seamless integration of diverse techniques for online operation control, optimal scheduling, and dynamic pricing. The design of a home energy manager based on this architecture is illustrated and the simulation results with Matlab/Simulink confirm the viability...

  18. The Stress Management in the Enterprise Management System

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-05-01

    Full Text Available The article systematizes the classification of the type of management by a number of attributes: horizon of ambition, priority style of interaction between management and managed systems, level of centralization, orientation, consideration of environmental impact, contents, type of activity, and response to deviation. Within terms of the attribute of response to deviations, place of the stress management is allocated near to the harmonic and the risk management. It has been substantiated that the stress management is the enterprise management system aimed at overcoming unwanted deviations that are significant, extreme, and have a significant negative impact on the operation of enterprise. In the structure of the stress management, the following integral components have been allocated and characterized: crisis, adaptive, reactive, fears, and anticipative.

  19. Prediction of maternal complications and adverse infant outcome at admission for temporizing management of early-onset severe hypertensive disorders of pregnancy

    NARCIS (Netherlands)

    Ganzevoort, Wessel; Rep, Annelies; de Vries, Johanna I. P.; Bonsel, Gouke J.; Wolf, Hans

    2006-01-01

    OBJECTIVE: We explored the association between clinical parameters at admission and the subsequent development of major maternal complications or adverse infant outcome in women with hypertensive complications of pregnancy remote from term. STUDY DESIGN: We drew data from a randomized trial of

  20. Business Management System Support Analysis

    Science.gov (United States)

    Parikh, Jay

    2008-01-01

    The purpose of this research project was to develop a searchable database compiled with internal and external audit findings/observations. The data will correspond to the findings and observations from the date of Center-wide implementation of the ISO 9001-2000 standard to the present (2003-2008). It was derived and extracted from several sources and was in multiple formats. Once extracted, categorization of the findings/observations would be possible. The final data was mapped to the ISO 9001-2000 standard with the understanding that it will be displayed graphically. The data will be used to verify trends, associate risks, and establish timelines to identify strengths and weaknesses to determine areas of improvement in the Kennedy Space Center Business Management System Internal Audit Program.

  1. Predicting Appropriate Admission of Bronchiolitis Patients in the Emergency Department: Rationale and Methods.

    Science.gov (United States)

    Luo, Gang; Stone, Bryan L; Johnson, Michael D; Nkoy, Flory L

    2016-03-07

    In young children, bronchiolitis is the most common illness resulting in hospitalization. For children less than age 2, bronchiolitis incurs an annual total inpatient cost of $1.73 billion. Each year in the United States, 287,000 emergency department (ED) visits occur because of bronchiolitis, with a hospital admission rate of 32%-40%. Due to a lack of evidence and objective criteria for managing bronchiolitis, ED disposition decisions (hospital admission or discharge to home) are often made subjectively, resulting in significant practice variation. Studies reviewing admission need suggest that up to 29% of admissions from the ED are unnecessary. About 6% of ED discharges for bronchiolitis result in ED returns with admission. These inappropriate dispositions waste limited health care resources, increase patient and parental distress, expose patients to iatrogenic risks, and worsen outcomes. Existing clinical guidelines for bronchiolitis offer limited improvement in patient outcomes. Methodological shortcomings include that the guidelines provide no specific thresholds for ED decisions to admit or to discharge, have an insufficient level of detail, and do not account for differences in patient and illness characteristics including co-morbidities. Predictive models are frequently used to complement clinical guidelines, reduce practice variation, and improve clinicians' decision making. Used in real time, predictive models can present objective criteria supported by historical data for an individualized disease management plan and guide admission decisions. However, existing predictive models for ED patients with bronchiolitis have limitations, including low accuracy and the assumption that the actual ED disposition decision was appropriate. To date, no operational definition of appropriate admission exists. No model has been built based on appropriate admissions, which include both actual admissions that were necessary and actual ED discharges that were unsafe. The

  2. AM admissions/PM discharges can reduce length of stay.

    Science.gov (United States)

    Shukla, R K; O'Hallaron, R D

    1986-01-01

    This article challenges our present system of afternoon admissions and morning discharges for its inefficiency in utilizing patient stay at the hospital as well as for its insensitivity to consumer convenience. In fact, the tradition of afternoon admissions and morning discharges may have its roots in the hotel industry which sets similar times for arrival and departure of guests. By changing the admission system from afternoon admissions and morning discharges (PM/AM) to morning admissions and evening discharges (AM/PM), the length of stay for most patients can be reduced and used more efficiently.

  3. An Introduction to Database Management Systems.

    Science.gov (United States)

    Warden, William H., III; Warden, Bette M.

    1984-01-01

    Description of database management systems for microcomputers highlights system features and factors to consider in microcomputer system selection. A method for ranking database management systems is explained and applied to a defined need, i.e., software support for indexing a weekly newspaper. A glossary of terms and 32-item bibliography are…

  4. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  5. Educational Management Information Systems: Progress and Prospectives.

    Science.gov (United States)

    Evans, John A.

    An educational management information system is a network of communication channels, information sources, computer storage and retrieval devices, and processing routines that provide data to educational managers at different levels, places, and times to facilitate decisionmaking. Management information systems should be differentiated from…

  6. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  7. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  8. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  9. 76 FR 14592 - Safety Management System; Withdrawal

    Science.gov (United States)

    2011-03-17

    ...-06A] RIN 2120-AJ15 Safety Management System; Withdrawal AGENCY: Federal Aviation Administration (FAA... (``product/ service providers'') to develop a Safety Management System (SMS). The FAA is withdrawing the... management with a set of robust decision-making tools to use to improve safety. The FAA received 89 comments...

  10. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  11. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  12. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  13. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  14. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  15. Mine management system based on PDCA cycle

    Science.gov (United States)

    Wang, Yunliang

    2017-10-01

    The scientific and effective management of mining enterprises has been a major problem for managers. And as modern technical equipment is continuously equipped to the mine, the traditional way of management has been unable to meet the needs, which causes many problems. In response to these questions, we apply PDCA cycle management patterns to mining enterprises in this paper, and establish a scientific and effective management system. After that the efficiency of mine production is greatly improved under the premise of safe production.

  16. ISO 55000: Creating an asset management system.

    Science.gov (United States)

    Bradley, Chris; Main, Kevin

    2015-02-01

    In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.

  17. Tests and College Admissions.

    Science.gov (United States)

    Hargadon, Fred

    1981-01-01

    Discusses different emphases placed by institutions of higher education on a range of admissions criteria including academic performance, evidence of graduation, letters of recommendation, personal essays, and interviews. Concludes that standardized tests are not the pervasive barrier to higher education in the United States that many test critics…

  18. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  19. BETWEEN BALANCED SCORECARD AND QUALITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Jelena Jovanović

    2008-09-01

    Full Text Available The aim of this research is to analyze parallel implementation of BSC as a strategic management system and quality management system by the principals of ISO 9000 certification. We will analyze advantages and disadvantages of the models. Further more, the research will analyze cumulative advantages of the two systems implementation. The research will present possibilities for BSC implementation in QMS environment, underlining the processes. We will put the accent on improvement of firm's effectiveness by Strategic Management System (BSC and Quality Management System's implementation.

  20. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  1. Radiation management computer system for Monju

    International Nuclear Information System (INIS)

    Aoyama, Kei; Yasutomo, Katsumi; Sudou, Takayuki; Yamashita, Masahiro; Hayata, Kenichi; Ueda, Hajime; Hosokawa, Hideo

    2002-01-01

    Radiation management of nuclear power research institutes, nuclear power stations and other such facilities are strictly managed under Japanese laws and management policies. Recently, the momentous issues of more accurate radiation dose management and increased work efficiency has been discussed. Up to now, Fuji Electric Company has supplied a large number of Radiation Management Systems to nuclear power stations and related nuclear facilities. We introduce the new radiation management computer system with adopted WWW technique for Japan Nuclear Cycle Development Institute, MONJU Fast Breeder Reactor (MONJU). (author)

  2. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  3. Hospital information management system: an evolutionary knowledge management perspective.

    Science.gov (United States)

    Wadhwa, S; Saxena, Avneet; Wadhwa, Bharat

    2007-01-01

    The evolving paradigm shift resulting from IT, social and technological changes has created a need for developing an innovative knowledge-based healthcare system, which can effectively meet global healthcare system demands and also cater to future trends. The Hospital Information Management System (HIMS) is developed with this sole aim in mind, which helps in processing and management of hospital information not only inside the boundary, but also beyond the hospital boundary, e.g., telemedicine or e-healthcare. The purpose of this paper is to present such kind of functional HIMS, which can efficiently satisfy the current and future system requirements by using Knowledge Management (KM) and data management systems. The HIMS is developed in a KM context, wherein users can share and use the knowledge more effectively. The proposed system is fully compatible with future technical, social, managerial and economical requirements.

  4. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  5. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  6. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  7. APPROACH TO ADAPTIVE LEARNING MANAGEMENT SYSTEM DESIGN

    Directory of Open Access Journals (Sweden)

    Vitaly A. Gaevoy

    2014-01-01

    Full Text Available In this paper, we describe how to increase the learning management systems effi ciency by using an adaptive approach. In our work we try and summarize the existing systems; the adaptability absence problem is discovered, programming and architectural adaptive learning management system designing approach is offered. 

  8. Challenges and potential improvements in the admission process of patients with spinal cord injury in a specialized rehabilitation clinic - an interview based qualitative study of an interdisciplinary team.

    Science.gov (United States)

    Röthlisberger, Fabian; Boes, Stefan; Rubinelli, Sara; Schmitt, Klaus; Scheel-Sailer, Anke

    2017-06-26

    The admission process of patients to a hospital is the starting point for inpatient services. In order to optimize the quality of the health services provision, one needs a good understanding of the patient admission workflow in a clinic. The aim of this study was to identify challenges and potential improvements in the admission process of spinal cord injury patients at a specialized rehabilitation clinic from the perspective of an interdisciplinary team of health professionals. Semi-structured interviews with eight health professionals (medical doctors, physical therapists, occupational therapists, nurses) at the Swiss Paraplegic Centre (acute and rehabilitation clinic) were conducted based on a maximum variety purposive sampling strategy. The interviews were analyzed using a thematic analysis approach. The interviewees described the challenges and potential improvements in this admission process, focusing on five themes. First, the characteristics of the patient with his/her health condition and personality and his/her family influence different areas in the admission process. Improvements in the exchange of information between the hospital and the patient could speed up and simplify the admission process. In addition, challenges and potential improvements were found concerning the rehabilitation planning, the organization of the admission process and the interdisciplinary work. This study identified five themes of challenges and potential improvements in the admission process of spinal cord injury patients at a specialized rehabilitation clinic. When planning adaptations of process steps in one of the areas, awareness of effects in other fields is necessary. Improved pre-admission information would be a first important step to optimize the admission process. A common IT-system providing an interdisciplinary overview and possibilities for interdisciplinary exchange would support the management of the admission process. Managers of other hospitals can supplement

  9. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  10. Profile of neurological admissions at the University of Nigeria Teaching Hospital Enugu.

    Science.gov (United States)

    Ekenze, O S; Onwuekwe, I O; Ezeala Adikaibe, B A

    2010-01-01

    The burden of Neurological diseases may be on the increase especially in developing countries. Improved outcome in these settings may require appreciation of the spectrum of Neurological diseases and the impediments to their management. We aim to determine the profile of neurological admissions and the challenges of managing these diseases at the University of Nigeria Teaching Hospital Enugu South East Nigeria. Analysis of Neurological admissions into the medical wards of the University of Nigeria Teaching Hospital Enugu from January 2003 to December 2007. Neurological admissions comprise about 14.8% of medical admissions. There were 640 (51%) males and 609 (49%) females. The spectrum of neurological diseases were stroke 64.9%, central nervous system infections (21.8% ), HIV related neurological diseases 3.5%, hypertensive encephalopathy (3.4%), dementia (3%), subarachnoid haemorrhage (2.2%), Guillian Barre syndrome (1.2%), Parkinson's disease (1.1%), myasthenia gravis (1.0%), motor neurone disease and peripheral neuropathy and accounted for 0.8% and 0.6% respectively. Overall, noninfectious disease accounted for 78.2% of neurological admissions while infectious diseases accounted for 11.8%. A wide spectrum of neurological diseases occurs in our setting. The high incidence of CNS infections indicates that efforts should be geared towards preventive measures. A major challenge to be addressed in the management of neurological diseases in our setting is the lack of specialized facilities.

  11. Call Admission Control in Mobile Cellular Networks

    CERN Document Server

    Ghosh, Sanchita

    2013-01-01

    Call Admission Control (CAC) and Dynamic Channel Assignments (DCA) are important decision-making problems in mobile cellular communication systems. Current research in mobile communication considers them as two independent problems, although the former greatly depends on the resulting free channels obtained as the outcome of the latter. This book provides a solution to the CAC problem, considering DCA as an integral part of decision-making for call admission. Further, current technical resources ignore movement issues of mobile stations and fluctuation in network load (incoming calls) in the control strategy used for call admission. In addition, the present techniques on call admission offers solution globally for the entire network, instead of considering the cells independently.      CAC here has been formulated by two alternative approaches. The first approach aimed at handling the uncertainty in the CAC problem by employing fuzzy comparators.  The second approach is concerned with formulation of CAC ...

  12. Management system, organizational climate and performance relationships

    Science.gov (United States)

    Davis, B. D.

    1979-01-01

    Seven aerospace firms were investigated to determine if a relationship existed among management systems, organizational climate, and organization performance. Positive relationships were found between each of these variables, but a statistically significant relationship existed only between the management system and organizational climate. The direction and amount of communication and the degree of decentralized decision-making, elements of the management system, also had a statistically significant realtionship with organization performance.

  13. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  14. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-05-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system as potential replacements namely: Proquest 360 Resource Manager, Ex Libris Alma and Open Source CORAL ERMS. After comparing and trialling the systems, it was decided to go for Proquest 360 Resource Manager.

  15. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  16. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  17. Managing chronic conditions care across primary care and hospital systems: lessons from an Australian Hospital Avoidance Risk Program using the Flinders Chronic Condition Management Program.

    Science.gov (United States)

    Lawn, Sharon; Zabeen, Sara; Smith, David; Wilson, Ellen; Miller, Cathie; Battersby, Malcolm; Masman, Kevin

    2017-08-24

    Objective The study aimed to determine the impact of the Flinders Chronic Condition Management Program for chronic condition self-management care planning and how to improve its use with Bendigo Health's Hospital Admission Risk Program (HARP). Methods A retrospective analysis of hospital admission data collected by Bendigo Health from July 2012 to September 2013 was undertaken. Length of stay during admission and total contacts post-discharge by hospital staff for 253 patients with 644 admissions were considered as outcome variables. For statistical modelling we used the generalised linear model. Results The combination of the HARP and Flinders Program was able to achieve significant reductions in hospital admissions and non-significant reduction in emergency department presentations and length of stay. The generalised linear model predicted that vulnerable patient groups such as those with heart disease (P=0.037) and complex needs (Pmanage chronic conditions through a greater focus on coordination and integration of care across primary care and hospital systems. In support of HARP, self-management interventions such as the Flinders Program aim to help individuals better manage their medical treatment and cope with the impact of the condition on their physical and mental wellbeing and thus reduce health services utilisation. What does this paper add? This paper sheds light on which patients might be more or less likely to benefit from the combination of the HARP and Flinders Program, with regard to their impact on reductions in hospital admissions, emergency department presentations and length of stay. This study also sheds light on how the Flinders Program could be better targeted towards and implemented among high-need and high-cost patients to lessen chronic disease burden on Australia's health system. What are the implications for practitioners? Programs targeting vulnerable populations and applying evidence-based chronic condition management and self-management

  18. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  19. Social Responsibility as a Management Control System

    National Research Council Canada - National Science Library

    Barger, Anthony

    2004-01-01

    .... Finally, they overlay the model from corporate America onto the Naval Postgraduate School to examine where socially responsible management control systems operate to control and adjust the overall...

  20. Lack of utility of a decision support system to mitigate delays in admission from the operating room to the postanesthesia care unit.

    Science.gov (United States)

    Ehrenfeld, Jesse M; Dexter, Franklin; Rothman, Brian S; Minton, Betty Sue; Johnson, Diane; Sandberg, Warren S; Epstein, Richard H

    2013-12-01

    When the phase I postanesthesia care unit (PACU) is at capacity, completed cases need to be held in the operating room (OR), causing a "PACU delay." Statistical methods based on historical data can optimize PACU staffing to achieve the least possible labor cost at a given service level. A decision support process to alert PACU charge nurses that the PACU is at or near maximum census might be effective in lessening the incidence of delays and reducing over-utilized OR time, but only if alerts are timely (i.e., neither too late nor too early to act upon) and the PACU slot can be cleared quickly. We evaluated the maximum potential benefit of such a system, using assumptions deliberately biased toward showing utility. We extracted 3 years of electronic PACU data from a tertiary care medical center. At this hospital, PACU admissions were limited by neither inadequate PACU staffing nor insufficient PACU beds. We developed a model decision support system that simulated alerts to the PACU charge nurse. PACU census levels were reconstructed from the data at a 1-minute level of resolution and used to evaluate if subsequent delays would have been prevented by such alerts. The model assumed there was always a patient ready for discharge and an available hospital bed. The time from each alert until the maximum census was exceeded ("alert lead time") was determined. Alerts were judged to have utility if the alert lead time fell between various intervals from 15 or 30 minutes to 60, 75, or 90 minutes after triggering. In addition, utility for reducing over-utilized OR time was assessed using the model by determining if 2 patients arrived from 5 to 15 minutes of each other when the PACU census was at 1 patient less than the maximum census. At most, 23% of alerts arrived 30 to 60 minutes prior to the admission that resulted in the PACU exceeding the specified maximum capacity. When the notification window was extended to 15 to 90 minutes, the maximum utility was system to mitigate

  1. Managing your digital life with a Personal information management system

    OpenAIRE

    Abiteboul, Serge; André, Benjamin; Kaplan, Daniel

    2015-01-01

    International audience; Computer wizards already know how to control their personal data to some extent. It is now becoming possible for everyone to do the same, and there are many advantages to doing so. Everyone should now be in a position to manage his/her personal information management system. This is the topic of this paper. To appear in Communications of the ACM

  2. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  3. Information Systems Coordinate Emergency Management

    Science.gov (United States)

    2012-01-01

    -changing planet. This information can be captured, analyzed, and visualized by geographic information systems (GIS) to produce maps, charts, and other tools that can reveal information essential to a wide variety of applications including emergency management. Knowing precise, real-time information about the size, location, environmental conditions, and resulting damage of an event like a flood or wildfire as well as the location and numbers of emergency responders and other resources contributes directly to the effectiveness of disaster mitigation. The need for such information is also evident when responding to homeland security threats, such as a terrorist attack. Recognizing the value of its geospatial information resources for this and other purposes, in 1998 Stennis and the state of Mississippi partnered to form what became the Enterprise for Innovative Geospatial Solutions (EIGS) industry cluster, supporting the growth of remote sensing and GIS-based research and business. As part of EIGS, several companies partnered with NASA through dual use and Small Business Innovation Research (SBIR) contracts. Among those was NVision.

  4. Automated attendance management and alert system | Rahim ...

    African Journals Online (AJOL)

    “Automated Attendance Management and Alert System (AAMAS)” was developed to help UiTM lecturers and Academic Affairs Department in monitoring students' absenteeism and improving the absenteeism record management. AAMAS provides various functions, from managing and recording students' attendance record ...

  5. Inappropriate Intensive Care Unit admissions: Nigerian doctors ...

    African Journals Online (AJOL)

    2015-12-04

    Dec 4, 2015 ... Conclusion: Inappropriate ICU admissions were perceived as a common event and were mainly attributed to pressure from seniors, referring clinicians, and hospital management. Further work is ..... Financial support and sponsorship. Nil. Conflicts of interest. There are no conflicts of interest. References. 1.

  6. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  7. Effective maintenance practices to manage system aging

    Science.gov (United States)

    Chockie, Alan; Bjorkelo, Kenneth

    A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence of maintenance programs on addressing the system and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. Four key elements of an effective maintenance program that are important to an aging management were identified: (1) the selection of critical systems and components; (2) the development of an understanding of aging through the collection and analysis of equipment performance information; (3) the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; and (4) the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations.

  8. System safety education focused on system management

    Science.gov (United States)

    Grose, V. L.

    1971-01-01

    System safety is defined and characteristics of the system are outlined. Some of the principle characteristics include role of humans in hazard analysis, clear language for input and output, system interdependence, self containment, and parallel analysis of elements.

  9. FORMATION OF THE ENTERPRISE COSTS MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Borysiuk Iryna

    2018-01-01

    Full Text Available Introduction. The paper deals with the actual issues of formation of the enterprise management system costs, because in the conditions of an unstable market environment the financial performance depends on the efficiency of the cost management system, competitiveness, financial sustainability and investment attractiveness of any subject of economic activity. Purpose of the article is consolidation of approaches to cost management, theoretical substantiation and development of recommendations regarding the formation of the enterprise cost management system. Results. Development of an enterprise cost management system based on research on the essence and cost management approaches. The goals, tasks, principles, methods, tools, functions and main elements of the cost management system were determined, factors of the external and internal environment of the enterprise, that affect the system of its costs management. Conclusions. Formation of integrated cost management system ensures the successful company operation on the market, production of competitive products based on costs and prices optimization and making a profit, increase of the reasonableness of making managerial decisions.

  10. Admission Criteria for MBA Programs

    Directory of Open Access Journals (Sweden)

    Silvana Dakduk

    2016-11-01

    Full Text Available This paper reports a review of studies on admission criteria for MBA programs. The method consisted in a literary review based on a systematic search in international databases (Emerald, ABI/INFORM Global, ProQuest Education Journals, ProQuest European Business, ProQuest Science Journal, ProQuest Research Library, ProQuest Psychology Journals, ProQuest Social Science Journals and Business Source Complete of studies published from January 1990 to December 2013, which explore the academic performance of students or graduates of MBA programs. A quantitative review was performed. Results show that most researchers studied relations between GMAT (Graduate Management Admission Test and UGPA (Undergraduate Grade Point Average as predictors of GGPA (Graduate Grade Point Average. On the other hand, work experience and personal traits (such as personality, motivation, learning strategies, self-efficacy beliefs and achievement expectations and their relation with GGPA had been less studied, and results are not consistent enough to consider them valid predictors of student performance at this time.

  11. Software for Intelligent System Health Management

    Science.gov (United States)

    Trevino, Luis C.

    2004-01-01

    This viewgraph presentation describes the characteristics and advantages of autonomy and artificial intelligence in systems health monitoring. The presentation lists technologies relevant to Intelligent System Health Management (ISHM), and some potential applications.

  12. Descriptions of Transit Maintenance Management Information Systems

    Science.gov (United States)

    1984-10-01

    This 289-page report presents an overview of ten maintenance management information systems that are currently operational or near-operational on minicomputers or microcomputers. The systems described address one or more of the following concerns: co...

  13. Logistics Reduction: Universal Waste Management System

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Advanced Exploration Systems (AES) Logistics Reduction (LR) project's Universal Waste Management System (UWMS) task is to develop a compact...

  14. Marine biological data and information management system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.

    Indian National Oceanographic Data Centre (INODC) is engaged in developing a marine biological data and information management system (BIODIMS). This system will contain the information on zooplankton in the water column, zoobenthic biomass...

  15. Waste Management Information System (WMIS) User Guide

    Energy Technology Data Exchange (ETDEWEB)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  16. Waste Management Information System (WMIS) User Guide

    International Nuclear Information System (INIS)

    Broz, R.E.

    2008-01-01

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data through the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal

  17. Introduction to data base management systems

    International Nuclear Information System (INIS)

    Rossiter, B.N.

    1984-01-01

    Data base management systems offer considerable advantages over elementary filing systems under favourable circumstances such as where data structures and applications are continually changing. The architecture of such systems and the manner in which they work is described, with particular attention to data independence. An introduction is made to the classification of data base management systems by the data structuring models that they employ. (orig.)

  18. Energy Management of Smart Distribution Systems

    Science.gov (United States)

    Ansari, Bananeh

    Electric power distribution systems interface the end-users of electricity with the power grid. Traditional distribution systems are operated in a centralized fashion with the distribution system owner or operator being the only decision maker. The management and control architecture of distribution systems needs to gradually transform to accommodate the emerging smart grid technologies, distributed energy resources, and active electricity end-users or prosumers. The content of this document concerns with developing multi-task multi-objective energy management schemes for: 1) commercial/large residential prosumers, and 2) distribution system operator of a smart distribution system. The first part of this document describes a method of distributed energy management of multiple commercial/ large residential prosumers. These prosumers not only consume electricity, but also generate electricity using their roof-top solar photovoltaics systems. When photovoltaics generation is larger than local consumption, excess electricity will be fed into the distribution system, creating a voltage rise along the feeder. Distribution system operator cannot tolerate a significant voltage rise. ES can help the prosumers manage their electricity exchanges with the distribution system such that minimal voltage fluctuation occurs. The proposed distributed energy management scheme sizes and schedules each prosumer's ES to reduce the electricity bill and mitigate voltage rise along the feeder. The second part of this document focuses on emergency energy management and resilience assessment of a distribution system. The developed emergency energy management system uses available resources and redundancy to restore the distribution system's functionality fully or partially. The success of the restoration maneuver depends on how resilient the distribution system is. Engineering resilience terminology is used to evaluate the resilience of distribution system. The proposed emergency energy

  19. Case management and adherence to an online disease management system.

    Science.gov (United States)

    Robertson, Lucy; Smith, Michael; Tannenbaum, Dennis

    2005-01-01

    Non-adherence to treatment presents a significant obstacle to achieving favourable health outcomes. We have studied consumers' adherence to an online disease management system for depression, called Recovery Road. Recovery Road was implemented on a pilot basis for mental health care in Western Australia. Recovery Road was available for use by consumers and clinicians to augment usual treatment. One hundred and thirty consumers who had been diagnosed with major depression were enrolled. Consumers who used Recovery Road (n = 98) were provided with education, progress monitoring, e-consultation, e-diary and online evidenced-based therapy. Consumers received either standard, automated adherence reminders by email (n = 69), or case management, which included personalized email and telephone follow-up in response to non-adherence (n = 29). After the first eight sessions, the adherence was 84% in the case management group and 55% in the automatic reminders group. The results suggest that case management increases adherence to online disease management systems.

  20. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  1. Safety Management System in Croatia Control Ltd.

    OpenAIRE

    Pavlin, Stanislav; Sorić, Vedran; Bilać, Dragan; Dimnik, Igor; Galić, Daniel

    2009-01-01

    International Civil Aviation Organization and other international aviation organizations regulate the safety in civil aviation. In the recent years the International Civil Aviation Organization has introduced the concept of the safety management system through several documents among which the most important is the 2006 Safety Management Manual. It treats the safety management system in all the segments of civil aviation, from carriers, aerodromes and air traffic control to design, constructi...

  2. Existence crises of actual financial management systems

    OpenAIRE

    SVASTA Mihai

    2009-01-01

    The present financial management systems reflects only partially the economic reality and they are no longer able to act as an instrument for the management. It is absurd that an economy populated by business models based on 21st century technology to use financial management systems based mainly on the same principles formalised by Luca Paciolli in 1494. Therefore, one of the causes of the current economic crisis could be the lack of coordination between the evolution of the business models ...

  3. Region 7 Laboratory Information Management System

    Science.gov (United States)

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  4. Management system for nuclear facilities and activities

    International Nuclear Information System (INIS)

    Kyei, Afrifa Yamoah

    2015-02-01

    A management system is set of procedures an organization need to order to meet its objectives. A management system is the framework of processes and procedures used to ensure that an organization can fufil all tasks require to achieve its objectives. A good efficiency of this system ensures proper safety culture in an organization. The aim of this project is to provide guidance for establishing, implementing, assessing and continually improving a management system that integrates safety, health, environmental, security, quality and economic elements, in order to meet the requirements established by the IAEA. Due to the number of nuclear and radiological accidents occurring over years. It is therefore necessary to have proper management systems to manage the situation. The management system shall be applicable to operators of nuclear reactors, activities using sources of ionizing radiation, radioactive waste management, the transport of radioactive material, radiation protection activities and any other practices or circumstances in which people may exposed to radiation from naturally occurring of artificial sources. An intergrated management system shall be employed to intergrate all of the organization's system and processes into one complete framework, to enable the organization to work as a single and with artificial objectives. (au)

  5. Social responsibility as a management system

    Directory of Open Access Journals (Sweden)

    Nuria Arimany-Serrat

    2018-02-01

    Originality/value: The study identifies a business management system that continuously organises and improves the performances of a company in the area of Corporate Social Responsibility, through audited certification that enhances the competitivity of companies that hold the international standard. The study also demonstrates the need for a management system to integrate into business models.

  6. ITS data management system : year one activities

    Science.gov (United States)

    1997-08-01

    This report documents research conducted in the development of an ITS data management system, hereafter referred to as ITS DataLink. The objective of the ITS DataLink system is to retain, manage, share, and analyze ITS data for a variety of tra...

  7. Disconnect Between Public Sector Management System and ...

    African Journals Online (AJOL)

    three regional governments, this article exposes how public sector management system (public finance and human resource management system) determines decentralization outcomes. It contends that outcomes of decentralization reforms are shaped not only by political and economic factors, as suggested in the ...

  8. African Traditional Knowledge Systems and Biodiversity Management

    African Journals Online (AJOL)

    There is a link between African Traditional Knowledge Systems and the management of Biodiversity. These have been passed over from one generation to the next through oral tradition. The lack of documentation of these systems of managing biodiversity has led to the existence of a gap between the scientifi cally based ...

  9. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  10. Environmental management systems in South Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla

    2004-01-01

    The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa.......The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa....

  11. Knowledge Management System Model for Learning Organisations

    Science.gov (United States)

    Amin, Yousif; Monamad, Roshayu

    2017-01-01

    Based on the literature of knowledge management (KM), this paper reports on the progress of developing a new knowledge management system (KMS) model with components architecture that are distributed over the widely-recognised socio-technical system (STS) aspects to guide developers for selecting the most applicable components to support their KM…

  12. The LHCb Data Management System

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    We shall describe all the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behaviour of LHCb Storage capacity.

  13. Pattern and outcome of admissions into the general Intensive Care ...

    African Journals Online (AJOL)

    1994-01-01

    Background: It is not clear if the modality of patient admission into the Intensive Care Unit influences outcome. The Intensive Care Unit was audited to determine the pattern of admission, course of illness and management outcome. Methods: In a retrospective study covering the period January 1, 1994 to December 31, 2003 ...

  14. Business Management Information System (BMIS): procedures manual

    Energy Technology Data Exchange (ETDEWEB)

    1978-09-01

    Interim Energy Technology policy guidelines for implementation, management, and operation of the ET Business Management Information System (ET-BMIS) are established. The objective of the ET-BMIS, the ET financial management information system for addressng the functions of budget formulation, budget execution, and procurement planning and tracking, is to satisfy line managers' needs for program information. The system capability, i.e., what information is to be provided to support line managers' needs, is described. How the system is to accomplish this is addressed. The participants and their roles are identified. Attachments include: (1) a chart illustrating the flow of ET-BMIS activities and information, from budget formulation through project completion; (2) a tabulation of current system data elements and recommended sources; and (3) a chart of potential output-reporting capabilities.

  15. Globalization and localization of Management Control Systems

    DEFF Research Database (Denmark)

    Toldbod, Thomas; Israelsen, Poul

    2014-01-01

    controls, through the theoretical lens of globalization, localization, and glocalization. The analysis documents that these different management control systems are affected differently by the processes of globalization and localization, whereby some are universal throughout the organization and others...... have more particular characteristics. Specifically, this study finds that cybernetic controls and administrative controls are designed as global management control systems. Planning controls are glocal systems and reward & compensation controls assume local characteristics. The finding leads...... to the conclusion that primary control systems are designed as global systems, which are universal throughout the company, whereas secondary systems are designed as local or glocal systems....

  16. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  17. Sequencing Information Management System (SIMS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fields, C.

    1996-02-15

    A feasibility study to develop a requirements analysis and functional specification for a data management system for large-scale DNA sequencing laboratories resulted in a functional specification for a Sequencing Information Management System (SIMS). This document reports the results of this feasibility study, and includes a functional specification for a SIMS relational schema. The SIMS is an integrated information management system that supports data acquisition, management, analysis, and distribution for DNA sequencing laboratories. The SIMS provides ad hoc query access to information on the sequencing process and its results, and partially automates the transfer of data between laboratory instruments, analysis programs, technical personnel, and managers. The SIMS user interfaces are designed for use by laboratory technicians, laboratory managers, and scientists. The SIMS is designed to run in a heterogeneous, multiplatform environment in a client/server mode. The SIMS communicates with external computational and data resources via the internet.

  18. Nova laser assurance-management system

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Nova assurance management system was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management system. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  19. Expert Systems for auditing management information systems

    Directory of Open Access Journals (Sweden)

    Gheroghe Popescu

    2007-05-01

    Full Text Available Expert systems are built with the help of: specialised programming languages or expert system generators (shell. But this structure was reached after tens of years of work and research, because expert systems are nothing but pragmatic capitalisation of the results of research carried out in artificial intelligence and theory of knowledge.

  20. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  1. Fims, forestry information management system: An overview

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This geographic information system has been developed as part of Forestry Canada's Eastern Quebec Forestry Program for woodlot owners in eastern Quebec. The goal was to provide private woodlot operators with a management system that uses the most advanced technology available. This booklet provides an overview of this system, explaining how the system can be used.

  2. Prospects of a Unified Management System

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Simonsen, Gorm

    2002-01-01

    In this article, the trend among management systems towards a common structure and the inclusion of additional areas of corporate concern (quality, environment, occupational health and safety and social responsibility) is outlined. The article suggests that a large part of the work associated...... with implementing and maintaining standardised management systems can be rationalised by developing a ?unified system?. The unified system is proposed to consist of a common basic standard of general managerial methodology expandable with supplements, which are related to the specific areas of concern...... that the company could wish to include in their management system and possibly have certified. It is estimated that such a unified management system would contribute to synergy between the activities related to each area of concern, resulting in a more careful and efficient treatment of the increasing number...

  3. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  4. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  5. Total quality environmental management: Integrating environmental and quality management systems

    Energy Technology Data Exchange (ETDEWEB)

    Carley, J.A.; Kubala, G.; Hudson, T. [and others

    1996-11-01

    As the oilfield industry strives to globally sustain continuous movement of environmental and quality performance, companies have come to realize Total Quality Environmental Management (TQEM) is essential in product research, development manufacturing and services. As our industry endeavors to continuously improve, more emphasis is being placed upon the management systems we apply such as ISO 14000 and ISO 9000. These standards are tools for improving environmental and quality performance, meeting customer requirements, and increasing profitability. lbs paper presents actual examples of the successful integration of environmental and quality management systems into an operational TQEM system. Also presented are pilot study evaluations of the draft ISO 14000 standards by two certified ISO 9000 facilities. Examples of continuous improvement and cross-functional teams as means to merge environment and quality management into the functions of process control, corrective and preventive action, document control, and waste management are presented. Results and improvements from facilities involved with TQEM discussed along with their strategies and progress in consolidating the environmental and quality programs into a single, viable management system. The case histories from various facilities demonstrate the implementation of TQEM and in TQEM promotes a cleaner environment, reduces costs, con- serves energy and raw materials, minimizes pollutants and wastes, and reduces redundant paperwork.

  6. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  7. Energy management system certification in industry

    Directory of Open Access Journals (Sweden)

    Jovanović Bojana V.

    2014-01-01

    Full Text Available Energy management system is a set of interrelated or interacting elements aiming to establish an energy policy and energy objectives, including processes and procedures to achieve those objectives. Certification of energy management systems according to standards EN 16001 and new standard ISO 50001 is a way to sustain energy use in an organization. There has been a lot of research about different aspects of energy efficiency and energy management in global industries, but none about the state of certification of energy management systems in global industries. This paper aims to give a comprehensive review of certification of energy management systems in different industries and its subsectors globally. Statistical analysis of available ISO 50001 certification data was used in this research.

  8. Environmental management systems and organizational change

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg

    2000-01-01

    The establishment of an environmental management system and its continuous improvements is a process towards a reduction of the companies' and the products' environmental impact. The organizations' ability to change is crucial in order to establish a dynamic environmental management system...... and environmental management systems. The structure of the organizations has changed, the relationships with external partners have strengthened and the implementation of quality and environmental management systems has trimmed the organizations to manage and develop these areas. The organization analysis is based...... and to achieve continuous environmental improvements. The study of changes gives an insight into how organizations function, as well as their forces and barriers. This article focuses on the organizational changes that two companies have undergone from 1992 up until today in connection with their quality...

  9. Revenue management system for the hospitality

    Directory of Open Access Journals (Sweden)

    Kalinka Pavlova

    2017-03-01

    Full Text Available The purpose of this study is to describe the essence of the revenue management system, applicable for entities in the hospitality industry, as a multidisciplinary concept, that draws its features from a variety of established academic areas, by consistently clarifying its intrinsic elements. This paper is intended to examine the revenue-management related theory, in regards with its generation and evolution, essence, as well as characteristics of service industries applying revenue management. The revenue management elements, related with economics, marketing, strategic management, information technology and finance, are summarized and described.

  10. 1995 Baseline solid waste management system description

    International Nuclear Information System (INIS)

    Anderson, G.S.; Konynenbelt, H.S.

    1995-09-01

    This provides a detailed solid waste system description that documents the treatment, storage, and disposal (TSD) strategy for managing Hanford's solid low-level waste, low-level mixed waste, transuranic and transuranic mixed waste, and greater-than-Class III waste. This system description is intended for use by managers of the solid waste program, facility and system planners, as well as system modelers. The system description identifies the TSD facilities that constitute the solid waste system and defines these facilities' interfaces, schedules, and capacities. It also provides the strategy for treating each of the waste streams generated or received by the Hanford Site from generation or receipt through final destination

  11. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  12. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  13. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  14. Searching your site's management information systems

    International Nuclear Information System (INIS)

    Marquez, W.; Rollin, C.

    1994-01-01

    The Department of Energy's guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort

  15. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  16. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  17. Integrated safety management system verification: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, R.F.

    1998-08-10

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

  18. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2017-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover......, specific methodological challenges arise when investigating waste systems, such as the allocation of impacts and the consideration of long-term emissions. The complexity of waste LCAs is mainly derived from the variability of the object under study (waste) which is made of different materials that may...

  19. Development of a change management system

    Science.gov (United States)

    Parks, Cathy Bonifas

    1993-01-01

    The complexity and interdependence of software on a computer system can create a situation where a solution to one problem causes failures in dependent software. In the computer industry, software problems arise and are often solved with 'quick and dirty' solutions. But in implementing these solutions, documentation about the solution or user notification of changes is often overlooked, and new problems are frequently introduced because of insufficient review or testing. These problems increase when numerous heterogeneous systems are involved. Because of this situation, a change management system plays an integral part in the maintenance of any multisystem computing environment. At the NASA Ames Advanced Computational Facility (ACF), the Online Change Management System (OCMS) was designed and developed to manage the changes being applied to its multivendor computing environment. This paper documents the research, design, and modifications that went into the development of this change management system (CMS).

  20. Building network management system for video conference system in intranet

    Science.gov (United States)

    Li, Hui; Bai, Lin; Ji, Yuefeng

    2004-04-01

    To provide visual communication over enterprise Intranet, the video conference system in H.323 has been proposed as a suitable architecture to take the place of circuit-switched telephony model. However, managing video conference system will be complicated due to the real-time monitoring and reporting. This paper presents some research on the network management of H.323 Video conference system, and introduces the standards about this system, such as ITU-T H.341 and H.350 recommendation, and then gives some advices on network management design for video conference system with the considering of the real-time feature.

  1. Assessing the economic value of avoiding hospital admissions by shifting the management of gram+ acute bacterial skin and skin-structure infections to an outpatient care setting.

    Science.gov (United States)

    Ektare, V; Khachatryan, A; Xue, M; Dunne, M; Johnson, K; Stephens, J

    2015-01-01

    To estimate, from a US payer perspective, the cost offsets of treating gram positive acute bacterial skin and skin-structure infections (ABSSSI) with varied hospital length of stay (LOS) followed by outpatient care, as well as the cost implications of avoiding hospital admission. Economic drivers of care were estimated using a literature-based economic model incorporating inpatient and outpatient components. The model incorporated equal efficacy, adverse events (AE), resource use, and costs from literature. Costs of once- and twice-daily outpatient infusions to achieve a 14-day treatment were analyzed. Sensitivity analyses were performed. Costs were adjusted to 2015 US$. Total non-drug medical cost for treatment of ABSSSI entirely in the outpatient setting to avoid hospital admission was the lowest among all scenarios and ranged from $4039-$4924. Total non-drug cost for ABSSSI treated in the inpatient setting ranged from $9813 (3 days LOS) to $18,014 (7 days LOS). Inpatient vs outpatient cost breakdown was: 3 days inpatient ($6657)/11 days outpatient ($3156-$3877); 7 days inpatient ($15,017)/7 days outpatient ($2495-$2997). Sensitivity analyses revealed a key outpatient cost driver to be peripherally inserted central catheter (PICC) costs (average per patient cost of $873 for placement and $205 for complications). Drug and indirect costs were excluded and resource use was not differentiated by ABSSSI type. It was assumed that successful ABSSSI treatment takes up to 14 days per the product labels, and that once-daily and twice-daily antibiotics have equal efficacy. Shifting ABSSSI care to outpatient settings may result in medical cost savings greater than 53%. Typical outpatient scenarios represent 14-37% of total medical cost, with PICC accounting for 28-43% of the outpatient burden. The value of new ABSSSI therapies will be driven by eliminating the need for PICC line, reducing length of stay and the ability to completely avoid a hospital stay.

  2. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  3. Effective maintenance practices to manage system aging

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies.

  4. Microsoft System Center Configuration Manager

    CERN Document Server

    Sandbu, Marius

    2013-01-01

    This book is a step-by-step tutorial that guides you through the key steps in implementing best solutions for high availability and performance tuning. It is split into two distinct approaches: client and site side HA and optimization.Microsoft SCCM High Availability and Performance Tuning is for IT professionals and consultants working with Configuration Manager who wish to learn the skills to deploy a redundant and scalable solution.

  5. Profitability of Management Systems on German Fenlands

    Directory of Open Access Journals (Sweden)

    Marco Rebhann

    2016-10-01

    Full Text Available Fens are organic sites that require drainage for agricultural use. Lowering the groundwater level leads to trade-offs between economic benefits and environmental impacts (i.e., CO2 and nutrient emissions. To identify management options that are both environmentally and economically sustainable, a propaedeutic systematic analysis of the costs, income and profit of different land use and management systems on fenlands is necessary. This study provides an overview of the profitability, labor demand and comparative advantages of feasible management systems on German fenlands. Twenty management practices in four land use systems are analyzed. The results indicate that most management systems are profitable only with subsidies and payments for ecosystem services. In addition to sales revenue, these payments are indispensable to promote peat-saving agricultural practices on fenlands. Regarding the labor aspect, intensive management systems caused an increase in working hours per hectare, which may positively affect employment in rural areas. The calculations obtained in this study can be used as a basis for estimations of greenhouse gas (GHG mitigation costs when management systems are associated with GHG emission values.

  6. Revenue management system for the hospitality

    OpenAIRE

    Kalinka Pavlova

    2017-01-01

    The purpose of this study is to describe the essence of the revenue management system, applicable for entities in the hospitality industry, as a multidisciplinary concept, that draws its features from a variety of established academic areas, by consistently clarifying its intrinsic elements. This paper is intended to examine the revenue-management related theory, in regards with its generation and evolution, essence, as well as characteristics of service industries applying revenue management...

  7. Warehouse management in ERP system

    OpenAIRE

    Matjaž, Grega

    2011-01-01

    The acronym ERP (Enterprise Resource Planning) celebrated its twentieth anniversary last year. In 1990 this acronym was used for the first time by the analysis group Gartner to refer to systems that have the ability to support several business functions in the same way. Today these systems are mainly introduced in large companies but because of their advantages they are also spreading to small and medium-sized companies. A decade ago, it seemed that ERP systems will become almighty. This ...

  8. Automated Instructional Management Systems (AIMS) Version III, System Manual.

    Science.gov (United States)

    New York Inst. of Tech., Old Westbury.

    This document sets forth the procedures necessary to understand and utilize the internal characteristics of the Automated Instructional Management System (AIMS), a computer-based system for the management of educational processes. In this manual, overall design concepts governing the development of AIMS are specified; and overview of its…

  9. 76 FR 76917 - Homeless Management Information Systems Requirements

    Science.gov (United States)

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  10. Change in Inpatient Rehabilitation Admissions for Individuals With Traumatic Brain Injury After Implementation of the Medicare Inpatient Rehabilitation Facility Prospective Payment System

    Science.gov (United States)

    Hoffman, Jeanne M.; Brown, Elena Donoso; Chan, Leighton; Dikmen, Sureyya; Temkin, Nancy; Bell, Kathleen R.

    2014-01-01

    Objective To evaluate the impact of Medicare’s inpatient rehabilitation facility (IRF) prospective payment system (PPS) on use of inpatient rehabilitation for individuals with traumatic brain injury (TBI). Design Retrospective cohort study of patients with TBI. Setting One hundred twenty-three level I and II trauma centers across the U.S. who contributed data to the National Trauma Data Bank. Participants Patients (N = 135,842) with TBI and an Abbreviated Injury Score of the head of 2 or greater admitted to trauma centers between 1995 and 2004. Interventions None. Main Outcome Measure Discharge location: IRF, skilled nursing facility, home, and other hospitals. Results Compared with inpatient rehabilitation admissions before IRF PPS came into effect, demographic characteristics of admitted patients changed. Those admitted to acute care trauma centers after PPS was enacted (January 2002) were older and nonwhite. No differences were found in rates of injury between men and women. Over time, there was a significant drop in the percent of patients being discharged to inpatient rehabilitation, which varied by region, but was found across all insurance types. In a logistic regression, after controlling for patient characteristics (age, sex, race), injury characteristics (cause, severity), insurance type, and facility, the odds of being discharged to an IRF after a TBI decreased 16% after Medicare’s IRF PPS system was enacted. Conclusions The enactment of the Medicare PPS appears to be associated with a reduction in the chance that patients receive inpatient rehabilitation treatment after a TBI. The impact of these changes on the cost, quality of care, and patient outcome is unknown and should be addressed in future studies. PMID:22840827

  11. SOFTWARE OPTIMIZATION OF BUSINESS PROCESS “UNIVERSITY ADMISSION CAMPAIGN”

    Directory of Open Access Journals (Sweden)

    Victor V. Babenko

    2015-01-01

    Full Text Available Admission campaign is an important part of the main business processes system of the university. Admission campaign is analyzed on the base of different modeling tools. The conceptual basis of CRM-system as information support of the process is proposed. It should be significant optimizing resource of business process. 

  12. INFORMATION SYSTEM OF ENTERPRISE SUPPLY CHAIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    I. V. Shatokhin

    2016-01-01

    Full Text Available The supply chain management method for manufacture scheduling and planning basedon APS-algorithm is offered. It . Logistics solutions and inventory management problems are discussed. The structure of automated control system of enterprise is designed and its tasks are described.

  13. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  14. Business School's Performance Management System Standards Design

    Science.gov (United States)

    Azis, Anton Mulyono; Simatupang, Togar M.; Wibisono, Dermawan; Basri, Mursyid Hasan

    2014-01-01

    This paper aims to compare various Performance Management Systems (PMS) for business school in order to find the strengths of each standard as inputs to design new model of PMS. There are many critical aspects and gaps notified for new model to improve performance and even recognized that self evaluation performance management is not well…

  15. Managing examination malpractice in Nigerian University system ...

    African Journals Online (AJOL)

    Managing examination malpractice in Nigerian University system using strategic management policy. ... This paper discusses the concept of examination malpractice and highlights a number of offences that are regarded as forms of examination malpractice at the pre-examination, examination and postexamination stages ...

  16. Managing Health Information System | Campbell | Nigerian ...

    African Journals Online (AJOL)

    The effective planning, management monitoring and evaluation of health services, health resources and indeed the health system requires a wealth of health information, with its simultaneous effective and efficient management. It is an instrument used to help policy-making, decision making and day to day actions in the ...

  17. Airport Economics: Management Control Financial Reporting Systems

    Science.gov (United States)

    Buchbinder, A.

    1972-01-01

    The development of management control financial reporting systems for airport operation is discussed. The operation of the system to provide the reports required for determining the specific revenue producing facilities of airports is described. The organization of the cost reporting centers to show the types of information provided by the system is analyzed.

  18. Management Information Systems: Applications to Educational Administration.

    Science.gov (United States)

    Witkin, Belle Ruth

    An orientation to management information systems (MIS) is offered which presents information about MIS in the context of public education and suggests some considerations that should be taken into account in designing and operating such systems. MIS is defined as a set of operating procedures that act as a control system to automatically provide…

  19. An Introduction to Digital Rights Management Systems

    NARCIS (Netherlands)

    Jonker, Willem

    2007-01-01

    This chapter gives a concise introduction to digital rights management (DRM) systems by first presenting the basic ingredients of the architecture of DRM systems for (audio and/or video) content delivery, followed by an introduction to two open-standard DRM systems, one developed in the mobile world

  20. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  1. Integrated safety management system verification: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  2. Automated Traffic Management System and Method

    Science.gov (United States)

    Glass, Brian J. (Inventor); Spirkovska, Liljana (Inventor); McDermott, William J. (Inventor); Reisman, Ronald J. (Inventor); Gibson, James (Inventor); Iverson, David L. (Inventor)

    2000-01-01

    A data management system and method that enables acquisition, integration, and management of real-time data generated at different rates, by multiple heterogeneous incompatible data sources. The system achieves this functionality by using an expert system to fuse data from a variety of airline, airport operations, ramp control, and air traffic control tower sources, to establish and update reference data values for every aircraft surface operation. The system may be configured as a real-time airport surface traffic management system (TMS) that electronically interconnects air traffic control, airline data, and airport operations data to facilitate information sharing and improve taxi queuing. In the TMS operational mode, empirical data shows substantial benefits in ramp operations for airlines, reducing departure taxi times by about one minute per aircraft in operational use, translating as $12 to $15 million per year savings to airlines at the Atlanta, Georgia airport. The data management system and method may also be used for scheduling the movement of multiple vehicles in other applications, such as marine vessels in harbors and ports, trucks or railroad cars in ports or shipping yards, and railroad cars in switching yards. Finally, the data management system and method may be used for managing containers at a shipping dock, stock on a factory floor or in a warehouse, or as a training tool for improving situational awareness of FAA tower controllers, ramp and airport operators, or commercial airline personnel in airfield surface operations.

  3. Measurement system as a subsystem of the quality management system

    OpenAIRE

    Ľubica Floreková; Ján Terpák; Marcela Čarnogurská

    2006-01-01

    Each measurement system and a control principle must be based on certain facts about the system behaviour (what), operation (how) and structure (why). Each system is distributed into subsystems that provide an input for the next subsystem. For each system, start is important the begin, that means system characteristics, collecting of data, its hierarchy and the processes distribution.A measurement system (based on the chapter 8 of the standard ISO 9001:2000 Quality management system, requirem...

  4. Social Responsibility as a Management Control System

    National Research Council Canada - National Science Library

    Barger, Anthony

    2004-01-01

    In this report, the authors examine how businesses with social responsibility as part of their core strategy use related management control systems within the business strategy control model set forth...

  5. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  6. A system model for water management.

    Science.gov (United States)

    Schenk, Colin; Roquier, Bastien; Soutter, Marc; Mermoud, André

    2009-03-01

    Although generally accepted as a necessary step to improve water management and planning, integrated water resources management (IWRM) methodology does not provide a clear definition of what should be integrated. The various water-related issues that IWRM might encompass are well documented in the literature, but they are generally addressed separately. Therefore, water management lacks a holistic, systems-based description, with a special emphasis on the interrelations between issues. This article presents such a system model for water management, including a graphical representation and textual descriptions of the various water issues, their components, and their interactions. This model is seen as an aide-memoire and a generic reference, providing background knowledge helping to elicit actual system definitions, in possible combination with other participatory systems approaches. The applicability of the model is demonstrated through its application to two test case studies.

  7. Surface Waters Information Management System (SWIMS)

    Data.gov (United States)

    Kansas Data Access and Support Center — The Surface Waters Information Management System (SWIMS) has been designed to meet multi-agency hydrologic database needs for Kansas. The SWIMS project was supported...

  8. CERN sells management system to Transacsys

    CERN Multimedia

    Rohde, L

    2001-01-01

    CERN has sold its Internal Transaction Management system to UK company Transacsys for 1 MCHF. The company will market it with Oracle although CERN will continue to work with Transacsys on the future developments (1/2 page).

  9. CERN sells management system to UK's Transacsys

    CERN Multimedia

    Rohde, L

    2001-01-01

    CERN has sold its Internal Transaction Management system to UK company Transacsys for 1 MCHF. The company will market it with Oracle although CERN will continue to work with Transacsys on the future developments (1/2 page).

  10. Region 7 Laboratory Information Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory...

  11. A Multilevel Secure Workflow Management System

    National Research Council Canada - National Science Library

    Kang, Myong H; Froscher, Judith N; Sheth, Amit P; Kochut, Krys J; Miller, John A

    1999-01-01

    The Department of Defense (DoD) needs multilevel secure (MLS) workflow management systems to enable globally distributed users and applications to cooperate across classification levels to achieve mission critical goals...

  12. Architecture for Integrated System Health Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Managing the health of vehicle, crew, and habitat systems is a primary function of flight controllers today. We propose to develop an architecture for automating...

  13. American Indian Systems for Natural Resource Management.

    Science.gov (United States)

    Quintana, Jorge O.

    1992-01-01

    Outlines the philosophy and general principles of "primitive" indigenous production technologies and natural resource management systems in North and South America. Discusses indigenous practices that promote sustainable production in gathering, hunting and fishing, minerals extraction, and agriculture. (SV)

  14. Food for Peace Management Information System

    Data.gov (United States)

    US Agency for International Development — FFPMIS is an online system managed by Devis and Micropact designed to track programs within FFP from initial submission to program closure. It is also tasked with...

  15. Marine geophysical data management and presentation system

    Digital Repository Service at National Institute of Oceanography (India)

    Kunte, P.D.

    The Geophysical Data Management and Presentation System (GPDMPS) constitutes an integral part of the large Geological Oceanographic Database (GODBASE) which is under development at the Indian National Oceanographic Data Centre (INODC...

  16. Los Alamos Plutonium Facility Waste Management System

    International Nuclear Information System (INIS)

    Smith, K.; Montoya, A.; Wieneke, R.; Wulff, D.; Smith, C.; Gruetzmacher, K.

    1997-01-01

    This paper describes the new computer-based transuranic (TRU) Waste Management System (WMS) being implemented at the Plutonium Facility at Los Alamos National Laboratory (LANL). The Waste Management System is a distributed computer processing system stored in a Sybase database and accessed by a graphical user interface (GUI) written in Omnis7. It resides on the local area network at the Plutonium Facility and is accessible by authorized TRU waste originators, count room personnel, radiation protection technicians (RPTs), quality assurance personnel, and waste management personnel for data input and verification. Future goals include bringing outside groups like the LANL Waste Management Facility on-line to participate in this streamlined system. The WMS is changing the TRU paper trail into a computer trail, saving time and eliminating errors and inconsistencies in the process

  17. Infrastructure Management Information System User Manual

    Science.gov (United States)

    1998-10-01

    This publication describes and explains the user interface for the Infrastructure Management Information System (IMIS). The IMIS is designed to answer questions regarding public water supply, wastewater treatment, and census information. This publica...

  18. Seaway Information System Management and Control Requirements

    Science.gov (United States)

    1973-10-01

    This report examines in detail the control and information system requirements of the St. Lawrence Seaway development program in terms of the needs of the vessel traffic controllers and the management users. Structural control models of Seaway operat...

  19. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  20. Training Requirements and Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    Cillan, T.F.; Hodgson, M.A.

    1992-05-01

    This is the software user's guide for the Training Requirements and Information Management System. This guide defines and describes the software operating procedures as they apply to the end user of the software program. This guide is intended as a reference tool for the user who already has an indepth knowledge of the Training Requirements and Information Management System functions and data reporting requirement.

  1. Environmental management systems in South-Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla Kornelia

    2003-01-01

    The paper presents and discusses some of the empirical findings regarding envi-ronmental management systems (EMS) of four companies in the automotive industry in South Africa and compares some of the findings to Danish and international experiences.......The paper presents and discusses some of the empirical findings regarding envi-ronmental management systems (EMS) of four companies in the automotive industry in South Africa and compares some of the findings to Danish and international experiences....

  2. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  3. Employee Information Management System (EIMS)

    Data.gov (United States)

    US Agency for International Development — The EIMS is the Office of Human Resources' web-based employee information system. Direct-hire employees can access and review their USAID personnel information, such...

  4. Image and information management system

    Science.gov (United States)

    Robertson, Tina L. (Inventor); Raney, Michael C. (Inventor); Dougherty, Dennis M. (Inventor); Kent, Peter C. (Inventor); Brucker, Russell X. (Inventor); Lampert, Daryl A. (Inventor)

    2009-01-01

    A system and methods through which pictorial views of an object's configuration, arranged in a hierarchical fashion, are navigated by a person to establish a visual context within the configuration. The visual context is automatically translated by the system into a set of search parameters driving retrieval of structured data and content (images, documents, multimedia, etc.) associated with the specific context. The system places ''hot spots'', or actionable regions, on various portions of the pictorials representing the object. When a user interacts with an actionable region, a more detailed pictorial from the hierarchy is presented representing that portion of the object, along with real-time feedback in the form of a popup pane containing information about that region, and counts-by-type reflecting the number of items that are available within the system associated with the specific context and search filters established at that point in time.

  5. Defense Security Assistance Management System

    National Research Council Canada - National Science Library

    1998-01-01

    ... $10 billion Foreign Military Sales Program. As envisioned, it will replace 13 automated information systems used by the Military Departments and Defense Security Assistance Agency and will provide standardized and improved security assistance...

  6. Measurement system as a subsystem of the quality management system

    Directory of Open Access Journals (Sweden)

    Ľubica Floreková

    2006-12-01

    Full Text Available Each measurement system and a control principle must be based on certain facts about the system behaviour (what, operation (how and structure (why. Each system is distributed into subsystems that provide an input for the next subsystem. For each system, start is important the begin, that means system characteristics, collecting of data, its hierarchy and the processes distribution.A measurement system (based on the chapter 8 of the standard ISO 9001:2000 Quality management system, requirements defines the measurement, analysis and improvement for each organization in order to present the products conformity, the quality management system conformity guarantee and for the continuously permanent improvement of effectivity, efficiency and economy of quality management system.

  7. [Electronic poison information management system].

    Science.gov (United States)

    Kabata, Piotr; Waldman, Wojciech; Kaletha, Krystian; Sein Anand, Jacek

    2013-01-01

    We describe deployment of electronic toxicological information database in poison control center of Pomeranian Center of Toxicology. System was based on Google Apps technology, by Google Inc., using electronic, web-based forms and data tables. During first 6 months from system deployment, we used it to archive 1471 poisoning cases, prepare monthly poisoning reports and facilitate statistical analysis of data. Electronic database usage made Poison Center work much easier.

  8. Agent based energy management systems

    Energy Technology Data Exchange (ETDEWEB)

    Wolter, Martin

    2012-07-01

    In liberalized, regulated energy markets, the different participants - namely producers and consumers of energy, transmission and distribution system operators as well as regulatory authorities - have partly divergent and partly convergent interests. Loads, power plants and grid operators try to maximize their own benefit in this highly complex environment accepting to act detrimentally to others. Although the relationship between the participants is mostly competitive, there are some fundamental shared interests, e.g. voltage stability, a constant system frequency or efficient energy production, transmission and distribution, which are endangered e.g. by increased injection of volatile sources in low and medium voltage grids, displacement of stabilizing bulk generation and the slowly progressing extension of the electric grid. There is a global consensus, that the resulting challenges can efficiently be faced using information and communication technologies to coordinate grid utilization and operation. The basic idea is to benefit from unused reserves by participating in deployment of system services e.g. reactive power supply to keep the voltage within certain bounds. The coordination can best be done by the grid operator. All activities of that kind are summarized under the umbrella term ''Smart Grid''. To simultaneously model the behavior and interests of different types of market participants and their convergent and divergent interests, multi-agent systems are used. They offer a perfectly fitting framework for this sort of game theory and can easily be adapted to all kinds of new challenges of electricity markets. In this work, multi-agent systems are used to either cooperatively or competitively solve problems in distribution and transmission systems. Therefore, conventional algorithms have to be modified to converge into multiple local optima using only small pieces of the entire system information. It is clearly stated, that personal

  9. Medical Conditions of Nursing Home Admissions

    Directory of Open Access Journals (Sweden)

    Nawrot Tim

    2010-07-01

    Full Text Available Abstract Background As long-term nursing home care is likely to increase with the aging of the population, identifying chronic medical conditions is of particular interest. Although need factors have a strong impact on nursing home (NH admission, the diseases causing these functional disabilities are lacking or unclear in the residents' file. We investigated the medical reason (primary diagnosis of a nursing home admission with respect to the underlying disease. Methods This study is based on two independent, descriptive and comparative studies in Belgium and was conducted at two time points (1993 and 2005 to explore the evolution over twelve years. Data from the subjects were extracted from the resident's file; additional information was requested from the general practitioner, nursing home physician or the head nurse in a face-to-face interview. In 1993 we examined 1332 residents from 19 institutions, and in 2005 691 residents from 7 institutions. The diseases at the time of admission were mapped by means of the International Classification of Diseases - 9th edition (ICD-9. Longitudinal changes were assessed and compared by a chi-square test. Results The main chronic medical conditions associated with NH admission were dementia and stroke. Mental disorders represent 48% of all admissions, somatic disorders 43% and social/emotional problems 8%. Of the somatic disorders most frequently are mentioned diseases of the circulatory system (35% [2/3 sequels of stroke and 1/5 heart failure], followed by diseases of the nervous system (15% [mainly Parkinson's disease] and the musculoskeletal system (14% [mainly osteoarthritis]. The most striking evolution from 1993 to 2005 consisted in complicated diabetes mellitus (from 4.3 to 11.4%; p Conclusion Diseases like stroke, diabetes and mobility problems are only important for institutionalisation if they cause functional disability. Diabetes related complications as cause of admission increased almost three

  10. A core management system for JRR-3

    International Nuclear Information System (INIS)

    Soyama, Kazuhiko; Tsuruta, Harumichi; Ichikawa, Hiroki; Nemoto, Hiroyuki.

    1991-05-01

    Japan Research Reactor No.3 (JRR-3) was upgraded to the thermal output with 20 MW by replacing the core, cooling system and utilization facilities. It is a water moderated and cooled, pool type reactor using 20% enriched U · Alx fuel. A core management system for JRR-3 has been made. This code system can manage of reactivity, power distribution and burn up in consideration of the position of control rod, fuel arrangement and operation pattern. This report is the user's manual of this code system. (author)

  11. System safety management: A new discipline

    Science.gov (United States)

    Pope, W. C.

    1971-01-01

    The systems theory is discussed in relation to safety management. It is suggested that systems safety management, as a new discipline, holds great promise for reducing operating errors, conserving labor resources, avoiding operating costs due to mistakes, and for improving managerial techniques. It is pointed out that managerial failures or system breakdowns are the basic reasons for human errors and condition defects. In this respect, a recommendation is made that safety engineers stop visualizing the problem only with the individual (supervisor or employee) and see the problem from the systems point of view.

  12. Environmental management systems: An industry viewpoint

    International Nuclear Information System (INIS)

    Ottenbreit, R.

    1993-01-01

    Imperial Oil is upgrading systems used to ensure protection of health and safety and to facilitate the internalization and integration of environmental considerations into its business. Work in progress related to this upgrading is reported. The upgrading was undertaken partly in response to increased expectations from stakeholders and from the notion that improvement of the environmental, health, and safety (EH ampersand S) aspects of business can have the effect of improving reliability, lowering expenses, and minimizing liabilities. The responsibility for establishing environmental policy and direction as well as the environmental management framework rests with Imperial Oil's management committee and the EH ampersand S committee of the board of directors. Responsibility and accountability for implementation and sustainment of environmental processes and systems resides with line management. One of the management systems, the Operations Integrity Management Framework, is described. Elements of this framework include management leadership, accountability, and commitment; risk assessment and management; management of change; personnel and training; incident investigation and analysis; and facilities design and construction. 2 figs

  13. Methods of forming thermal management systems and thermal management methods

    Science.gov (United States)

    Gering, Kevin L.; Haefner, Daryl R.

    2012-06-05

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  14. A computer-based purchase management system

    International Nuclear Information System (INIS)

    Kuriakose, K.K.; Subramani, M.G.

    1989-01-01

    The details of a computer-based purchase management system developed to meet the specific requirements of Madras Regional Purchase Unit (MRPU) is given. Howe ver it can be easily modified to meet the requirements of any other purchase department. It covers various operations of MRPU starting from indent processing to preparation of purchase orders and reminders. In order to enable timely management action and control facilities are provided to generate the necessary management information reports. The scope for further work is also discussed. The system is completely menu driven and user friendly. Appendix A and B contains the menu implemented and the sample outputs respectively. (author)

  15. Mastering System Center 2012 Configuration Manager

    CERN Document Server

    Rachui, Steve; Martinez, Santos; Daalmans, Peter

    2012-01-01

    Expert coverage of Microsoft's highly anticipated network software deployment tool The latest version of System Center Configuration Manager (SCCM) is a dramatic update of its predecessor Configuration Manager 2007, and this book offers intermediate-to-advanced coverage of how the new SCCM boasts a simplified hierarchy, role-based security, a new console, flexible application deployment, and mobile management. You'll explore planning and installation, migrating from SCCM 2007, deploying software and operating systems, security, monitoring and troubleshooting, and automating and customizing SCC

  16. [A medical consumable material management information system].

    Science.gov (United States)

    Tang, Guoping; Hu, Liang

    2014-05-01

    Medical consumables material is essential supplies to carry out medical work, which has a wide range of varieties and a large amount of usage. How to manage it feasibly and efficiently that has been a topic of concern to everyone. This article discussed about how to design a medical consumable material management information system that has a set of standardized processes, bring together medical supplies administrator, suppliers and clinical departments. Advanced management mode, enterprise resource planning (ERP) applied to the whole system design process.

  17. Management Intelligent Systems : First International Symposium

    CERN Document Server

    Martínez-López, Francisco; Rodríguez, Juan

    2012-01-01

    The 2012 International Symposium on Management Intelligent Systems is believed to be the first international forum to present and discuss original, rigorous and significant contributions on Artificial Intelligence-based (AI) solutions—with a strong, practical logic and, preferably, with empirical applications—developed to aid the management of organizations in multiple areas, activities, processes and problem-solving; i.e., what we propose to be named as Management Intelligent Systems (MiS). The three-day event aimed to bring together researchers interested in this promising interdisciplinary field who came from areas as varied as management, marketing, and business in general, computer science, artificial intelligence, statistics, etc. This volume presents the proceedings of these activities in a collection of contributions with many original approaches. They address diverse Management and Business areas of application such as decision support, segmentation of markets, CRM, product design, service person...

  18. Multiple system modelling of waste management

    International Nuclear Information System (INIS)

    Eriksson, Ola; Bisaillon, Mattias

    2011-01-01

    Highlights: → Linking of models will provide a more complete, correct and credible picture of the systems. → The linking procedure is easy to perform and also leads to activation of project partners. → The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

  19. COMMUNICATION AND INFORMATION SYSTEM MANAGEMENT INTERNATIONAL

    Directory of Open Access Journals (Sweden)

    Mircea Alexandru Răduţeanu

    2012-01-01

    Full Text Available In recent decades international management itself as a separate component of the general science of leadership, is an intercultural management. In this context of globalization, computerization, any business that wants have a modern management should have a structured information system based on communication, overall objective consisting in providing accurate data in real time all parties, increasing the level of communication. Given these considerations, we conducted this work trying to highlight the role of communication in achieving a modern, emphasizing international management features.The paper is divided into 6 parts, prefaced by an introduction of the paper we presented and completed within a set of conclusions on the effectiveness of communication. During the other paragraphs, we present the theoretical concepts of international management, communication, after which I stressed the role of information communication, managerial communication and will then focus on the process, taking stock of its specific stages in international management.

  20. Tank waste remediation system risk management list

    International Nuclear Information System (INIS)

    Collard, L.B.

    1995-01-01

    The Tank Waste Remedation System (TWRS) Risk Management List and it's subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists

  1. Information Technology Management Strategies to Implement Knowledge Management Systems

    Science.gov (United States)

    McGee, Mary Jane Christy

    2017-01-01

    More than 38% of the U.S. public workforce will likely retire by 2030, which may result in a labor shortage. Business leaders may adopt strategies to mitigate knowledge loss within their organizations by capturing knowledge in a knowledge management system (KMS). The purpose of this single case study was to explore strategies that information…

  2. RFID system in warehouse management

    OpenAIRE

    Stipančič, Vedran

    2014-01-01

    The goal of the thesis was to create an RFID system that enables traceability of products, tagged with RFID stickers or tags and overview of data on desktop or mobile devices. In the implementation of the RFID system, two applications were developed, called RFID Portal and SCM Portal. RFID Portal is a desktop application that operates an RFID door, which detects products, that arrive at a warehouse and leave it and temperatures in which they were kept. All the collected data is sent to the we...

  3. Admission Control in IMS Networks

    Directory of Open Access Journals (Sweden)

    Erik Chromy

    2013-01-01

    Full Text Available In our paper there is an emphasis on simulations of admission control methods in MATLAB environment. The main task of admission control method is to make a decision if the connection requiring network access should be accepted to the network or the access should be rejected. If the connection is accepted to the network, the admission control has to ensure that Quality of Service of this connection will be satisfied, as well as Quality of Service of all other existing connections. We have observed several Measurement based admission control algorithms and the result is the identification of the suitable algorithm which can estimate the required bandwidth.

  4. Managing Sustainable Information Systems Development

    DEFF Research Database (Denmark)

    Kautz, Karlheinz

    2013-01-01

    Sustainable information systems development (ISD) in the context of this paper is not about products that support sustainability at large with its environmental, economic and social dimensions and little about the development of sustainable products, which are both without doubt important topics...

  5. Humanitarian information management and systems

    NARCIS (Netherlands)

    van de Walle, B.A.; van den Eede, G.G.P.; Muhren, W.J.; Loffler, J.; Klann, M.

    2009-01-01

    In times of major disasters such as hurricane Katrina or the Sichuan earthquake, the need for accurate and timely information is as crucial as is rapid and coherent coordination among the responding humanitarian community. Effective humanitarian information systems that provide timely access to

  6. Power Management for Energy Systems

    DEFF Research Database (Denmark)

    Hovgaard, Tobias Gybel

    by the industrial applications, and defining economic objectives that reect the real physics of the systems as well as our control objectives; 3) solving the involved, non-trivial optimization problems eciently in real-time; 4) demonstrating the feasibility and potential of the proposed methods by extensive...

  7. Features of the Kozloduy NPP management system

    International Nuclear Information System (INIS)

    2016-01-01

    The Kozloduy NPP management system was built taking into account the specifics of the organizational structure and management of the Company, actual processes and practices, and is oriented towards future development, with the participation of all staff. Additional requirements integrated in the system that distinguish it from general industrial requirements of management systems are: priority of nuclear safety; safety culture; knowledge management including extraction and storage of 'hidden knowledge'; periodic self-assessments; use of graded response to the products and activities; use of 'conservative approach' in decision making;; possibilities for self learning and creating of a vision of 'leaders' and 'professional workers in nuclear energy

  8. Information management systems improve advanced plant design

    International Nuclear Information System (INIS)

    Turk, R.S.; Serafin, S.A.; Leckley, J.B.

    1994-01-01

    Computer-aided engineering tools are proving invaluable in both the design and operation of nuclear power plants. ABB Combustion Engineering's Advanced Light Water Reactor (ALWR) features a computerized Information Management System (IMS) as an integral part of the design. The System 80+IMS represents the most powerful information management tool for Nuclear Power Plants commercially available today. Developed by Duke Power Company specifically for use by nuclear power plant owner operators, the IMS consists of appropriate hardware and software to manage and control information flow for all plant related work or tasks in a systematic, consistent, coordinated and informative manner. A significant feature of this IMS is that it is primarily based on plant data. The principal design tool, PASCE (Plant Application and Systems from Combustion Engineering), is comprised of intelligent databases that describe the design and from which accurate plant drawings are created. Additionally the IMS includes, at its hub, a relational database management system and an associated document management system. The data-based approach and applications associated with the IMS were developed, and have proven highly effective, for plant modifications, configuration management, and operations and maintenance applications at Duke Power Company's operating nuclear plants. This paper presents its major features and benefits. 4 refs

  9. Integrated therapy safety management system

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-01-01

    Aims The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an ‘integrated therapy safety management’ is drafted. This concept could serve as a basis to improve resilience. Methods The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for ‘integrated therapy safety management’. The concept is applied by way of example for the ‘medication process’ to demonstrate its practical implementation. Results The ‘integrated therapy safety management’ is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of ‘bridge managers’. ‘Bridge managers’ anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the ‘bridge managers’ and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. Conclusions The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. PMID:24007448

  10. Perceptions of veterinary admissions committee members of ...

    African Journals Online (AJOL)

    Veterinary admission committees are asked to create and implement a fair, reliable, and valid system to select the candidates most likely to succeed in veterinary school from a large pool of applicants. Although numerous studies have explored grade point average (GPA) as a predictive value of later academic success, ...

  11. Managing adaptively for multifunctionality in agricultural systems.

    Science.gov (United States)

    Hodbod, Jennifer; Barreteau, Olivier; Allen, Craig; Magda, Danièle

    2016-12-01

    The critical importance of agricultural systems for food security and as a dominant global landcover requires management that considers the full dimensions of system functions at appropriate scales, i.e. multifunctionality. We propose that adaptive management is the most suitable management approach for such goals, given its ability to reduce uncertainty over time and support multiple objectives within a system, for multiple actors. As such, adaptive management may be the most appropriate method for sustainably intensifying production whilst increasing the quantity and quality of ecosystem services. However, the current assessment of performance of agricultural systems doesn't reward ecosystem service provision. Therefore, we present an overview of the ecosystem functions agricultural systems should and could provide, coupled with a revised definition for assessing the performance of agricultural systems from a multifunctional perspective that, when all satisfied, would create adaptive agricultural systems that can increase production whilst ensuring food security and the quantity and quality of ecosystem services. The outcome of this high level of performance is the capacity to respond to multiple shocks without collapse, equity and triple bottom line sustainability. Through the assessment of case studies, we find that alternatives to industrialized agricultural systems incorporate more functional goals, but that there are mixed findings as to whether these goals translate into positive measurable outcomes. We suggest that an adaptive management perspective would support the implementation of a systematic analysis of the social, ecological and economic trade-offs occurring within such systems, particularly between ecosystem services and functions, in order to provide suitable and comparable assessments. We also identify indicators to monitor performance at multiple scales in agricultural systems which can be used within an adaptive management framework to increase

  12. Managing adaptively for multifunctionality in agricultural systems

    Science.gov (United States)

    Hodbod, Jennifer; Barreteau, Olivier; Allen, Craig R.; Magda, Danièle

    2016-01-01

    The critical importance of agricultural systems for food security and as a dominant global landcover requires management that considers the full dimensions of system functions at appropriate scales, i.e. multifunctionality. We propose that adaptive management is the most suitable management approach for such goals, given its ability to reduce uncertainty over time and support multiple objectives within a system, for multiple actors. As such, adaptive management may be the most appropriate method for sustainably intensifying production whilst increasing the quantity and quality of ecosystem services. However, the current assessment of performance of agricultural systems doesn’t reward ecosystem service provision. Therefore, we present an overview of the ecosystem functions agricultural systems should and could provide, coupled with a revised definition for assessing the performance of agricultural systems from a multifunctional perspective that, when all satisfied, would create adaptive agricultural systems that can increase production whilst ensuring food security and the quantity and quality of ecosystem services. The outcome of this high level of performance is the capacity to respond to multiple shocks without collapse, equity and triple bottom line sustainability. Through the assessment of case studies, we find that alternatives to industrialized agricultural systems incorporate more functional goals, but that there are mixed findings as to whether these goals translate into positive measurable outcomes. We suggest that an adaptive management perspective would support the implementation of a systematic analysis of the social, ecological and economic trade-offs occurring within such systems, particularly between ecosystem services and functions, in order to provide suitable and comparable assessments. We also identify indicators to monitor performance at multiple scales in agricultural systems which can be used within an adaptive management framework to

  13. X-33/RLV System Health Management/Vehicle Health Management

    Science.gov (United States)

    Mouyos, William; Wangu, Srimal

    1998-01-01

    To reduce operations costs, Reusable Launch Vehicles (RLVS) must include highly reliable robust subsystems which are designed for simple repair access with a simplified servicing infrastructure, and which incorporate expedited decision-making about faults and anomalies. A key component for the Single Stage To Orbit (SSTO) RLV system used to meet these objectives is System Health Management (SHM). SHM incorporates Vehicle Health Management (VHM), ground processing associated with the vehicle fleet (GVHM), and Ground Infrastructure Health Management (GIHM). The primary objective of SHM is to provide an automated and paperless health decision, maintenance, and logistics system. Sanders, a Lockheed Martin Company, is leading the design, development, and integration of the SHM system for RLV and for X-33 (a sub-scale, sub-orbit Advanced Technology Demonstrator). Many critical technologies are necessary to make SHM (and more specifically VHM) practical, reliable, and cost effective. This paper will present the X-33 SHM design which forms the baseline for the RLV SHM, and it will discuss applications of advanced technologies to future RLVs. In addition, this paper will describe a Virtual Design Environment (VDE) which is being developed for RLV. This VDE will allow for system design engineering, as well as program management teams, to accurately and efficiently evaluate system designs, analyze the behavior of current systems, and predict the feasibility of making smooth and cost-efficient transitions from older technologies to newer ones. The RLV SHM design methodology will reduce program costs, decrease total program life-cycle time, and ultimately increase mission success.

  14. Emergency department orthopedics observation unit as an alternative to admission.

    Science.gov (United States)

    Ernst, Amy A; Jones, Jaime; Weiss, Steven J; Silva, Otono

    2014-10-01

    Inclusion of select orthopedic problems in the orthopedics observation unit (OOU) may reduce hospital admissions. Our system allows OOU status for 24 hours, but the effect on admissions is unknown. Our primary hypothesis was that we could predict which OOU patients required admission based on the presence of uncontrolled pain. Data were prospectively collected for all OOU patients in this prospective observational study, including data on extremity cellulitis, fractures, and spine injuries awaiting brace placement.The primary outcome variable was admission to the hospital versus discharge home. The a priori hypotheses were that patients with more persistent or worsening pain would require admission more often and that the OOU would result in fewer patients needing a costlier inpatient admission to the hospital. An a priori power analysis showed adequate power of 80% to detect a difference between admitted and discharged patients. Data were prospectively collected from August 2011 to August 2012 for 199 consecutive OOU patients, 62% of whom were men. Diagnoses included infection (cellulitis or abscess of extremity) in 76%, fracture in 15% and other in 9% of the patients. Sixty-two patients (31%) were admitted and 7 patients (4%) made return visits for the same problem within a 30-day period. No significant relations existed between any of the independent variables and admission on bivariate analysis. Multivariable logistic regression found no significant predictors of hospital admission. Logistic regression was not performed on 30-day returns because of the low event rate (4%). An OOU prevented 138 of 199 (69%) patients from being admitted to a hospital. There were no significant predictors of which patients would require admission. Pain was not a predictor of need for admission. The lack of significant predictors is important in suggesting that without the ability to predict which patients require admission, a system using an OOU can reduce admissions by more than

  15. Implementation of the Environmental Management System in Radioactive Waste Management

    International Nuclear Information System (INIS)

    Fabjan, M.; Kralj, M.; Rojc, J.

    2008-01-01

    Agency for Radwaste Management (ARAO) is a public institution assigned to provide effective, safe and responsible management of all kinds of radioactive waste in Slovenia from the moment they arise to their final disposal. Therefore it holds an important role in environmental protection. Its main assignment is to provide conditions for permanent disposal of radioactive waste. It is also authorised to perform public service of radioactive waste management from small producers that includes: collection of the waste from small producers at the producers' premises, transportation to the storage facility, treatment, conditioning storage of RW from small producers; acceptance of radioactive waste in case of emergency situation (e.g. transport accidents); acceptance of radioactive waste in case of unknown producer; operation and management of Central Interim Storage of Radioactive Waste. The quality of ARAO performance in carrying out its mission is assured by implementing the environmental management system according to the standard ISO 14001:2004. Its effectiveness was confirmed by certification in October 2007. The ISO 14001:2004 certificate represents a permanent commitment of ARAO to implement and improve the environmental management system and to include environmental aspects in all its activities, especially in performing the public service. We developed own evaluation criteria for determination of relevant environmental impacts and aspects. ARAO has defined its environmental policy and objectives, it evaluates its environmental impacts yearly, and defines its environmental programmes that not only fulfil legal requirements but tend even to reduce the impacts below legally set levels. A very important environmental programme in the last few years was the reconstruction of the storage facility. Public information and communication programmes are considered to be important also from the environmental management point of view, because public shows great interest in

  16. Tank waste remediation system systems engineering management plan

    International Nuclear Information System (INIS)

    Peck, L.G.

    1998-01-01

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance

  17. NASA Administrative Data Base Management Systems, 1984

    Science.gov (United States)

    Radosevich, J. D. (Editor)

    1984-01-01

    Strategies for converting to a data base management system (DBMS) and the implementation of the software packages necessary are discussed. Experiences with DBMS at various NASA centers are related including Langley's ADABAS/NATURAL and the NEMS subsystem of the NASA metrology informaton system. The value of the integrated workstation with a personal computer is explored.

  18. Electricity: capacity management Systems in Europe

    International Nuclear Information System (INIS)

    Le Bihan-Graf, Christine; L'Hostis, Catherine; Souriadakis, Angelos

    2015-01-01

    In Europe, several States have installed capacity management systems to reduce the risk of power failures during peak periods of energy consumption. These systems are still too recent to be fully evaluated. However, everything should be done to ensure their harmonisation on a European scale. (authors)

  19. Introduction To Natural Resources Management Extension System ...

    African Journals Online (AJOL)

    Introduction To Natural Resources Management Extension System (Nrmes); Rethinking In Extension Systems For 21st Century. ... Growing food demands, soil nutrient depletion is occurring in many tropical and subtropical countries, and land degradation and desertification continues to progress in many other countries.

  20. An Architecture for Open Learning Management Systems

    NARCIS (Netherlands)

    Avgeriou, Paris; Retalis, Simos; Skordalakis, Manolis

    2003-01-01

    There exists an urgent demand on defining architectures for Learning Management Systems, so that high-level frameworks for understanding these systems can be discovered, and quality attributes like portability, interoperability, reusability and modifiability can be achieved. In this paper we propose