WorldWideScience

Sample records for admission management system

  1. Pharmacist-led admission medication reconciliation before and after the implementation of an electronic medication management system.

    Science.gov (United States)

    Sardaneh, Arwa A; Burke, Rosemary; Ritchie, Angus; McLachlan, Andrew J; Lehnbom, Elin C

    2017-05-01

    To investigate the impact of the introduction of an electronic medication management system on the proportion of patients with a recorded medication reconciliation on admission, the time from admission to when medication reconciliation was performed, and the characteristics of patients receiving this intervention pre-and post-implementation. An electronic medication management system was implemented in an Australian hospital from May to July 2015. A retrospective observational study was conducted in three wards across two phases; pre- (August 2014) and post- (August 2015) implementation. The study sample included every second patient admitted to these wards. A total of 370 patients were included, 179 pre- and 191 post-implementation. The proportion of recorded admission medication reconciliation significantly increased post-implementation in all study wards; coronary care unit (40 vs 68%, p=0.004), gastroenterology ward (39 vs 59%, p=0.015), and the neurology ward (19 vs 45%, p=0.002). The proportion of patients with recorded medication reconciliation within 24h of weekday admissions, or 48-72h of weekend admissions, increased from 47% pre- to 84% post-implementation. Admission medication reconciliation was recorded within a median of 1.0day for weekday admissions pre- and post-implementation (IQR 1.1 vs 0.2, respectively), and 3.5days (IQR 2.0) pre-implementation vs 1.5days (IQR 2.0) post-implementation for weekend admissions. Overall, across both phases pre-and post-implementation, admission medication reconciliation was recorded for patients who were significantly older (median 77 and 71 years, p<0.001), had a higher number of preadmission medications (median 6.5 and 5.0 medicines, p=0.001), and had a longer hospital stay (median 6.5 and 5.1days, p=0.003). A significantly higher proportion of patients with recorded medication reconciliation in the pre-implementation phase experienced polypharmacy (61%, p=0.002), hyperpolypharmacy (15%, p=0.001), and used a high

  2. Advantages of a Web-Based Real-Time Bed-Management System for Hospital Admission Monitoring in Iran.

    Science.gov (United States)

    Abedian, Somayeh; Bitaraf, Ehsan; Askari, Marjan

    2018-01-01

    Lack of up-to-date information of hospitals beds, specifically in emergencies, is a significant problem in many large countries; The Ministry of Health and Medical Education of Iran (MOHME) designed and implemented a dynamic system that reports the status of beds in 2012. This system created great opportunities for national bed management, including real-time hospital admission monitoring, especially for emergency departments, ICUs and CCUs. Therefore, an additional online system was planned to be implemented for monitoring hospital admissions, including a national alert system. Prior to the design of this system, a study was done using literature study and expert opinion to investigate the advantages and features that this monitoring system was required to have. We used the MoSCoW method to prioritize the requirements of the system. This system was designed to have the following advantages, among other things: the hospitals as well as government should be able to track the patients, manage patient distribution in healthcare centers, and make policy for supplying extra beds. It should also be possible for the hospitals executive board, as well as the government, to monitor the performance of the hospitals regarding patient admissions (i.e., the rate of rejection of patients with severe conditions).

  3. Admission Control Techniques for UMTS System

    Directory of Open Access Journals (Sweden)

    P. Kejik

    2010-09-01

    Full Text Available Universal mobile telecommunications system (UMTS is one of the 3rd generation (3G cell phone technologies. The capacity of UMTS is interference limited. Radio resources management (RRM functions are therefore used. They are responsible for supplying optimum coverage, ensuring efficient use of physical resources, and providing the maximum planned capacity. This paper deals with admission control techniques for UMTS. An own UMTS simulation program and several versions of proposed admission control algorithms are presented in this paper. These algorithms are based on fuzzy logic and genetic algorithms. The performance of algorithms is verified via simulations.

  4. Professional perspectives on systemic barriers to admission avoidance: learning from a system dynamics study of older people's admission pathways.

    Science.gov (United States)

    Walsh, Bronagh; Lattimer, Valerie; Wintrup, Julie; Brailsford, Sally

    2015-06-01

    There is debate worldwide about the best way to manage increased healthcare demand within ageing populations, particularly rising rates of unplanned and avoidable hospital admissions. To understand health and social care professionals' perspectives on barriers to admission avoidance throughout the admissions journey, in particular: the causes of avoidable admissions in older people; drivers of admission and barriers to use of admission avoidance strategies; and improvements to reduce unnecessary admissions. A qualitative framework analysis of interview data from a System dynamics (SD) modelling study. Semi-structured interviews were conducted with twenty health and social care professionals with experience of older people's admissions. The interviews were used to build understanding of factors facilitating or hindering admission avoidance across the admissions system. Data were analysed using framework analysis. Three overarching themes emerged: understanding the needs of the patient group; understanding the whole system; and systemwide access to expertise in care of older people. There were diverse views on the underlying reasons for avoidable admissions and recognition of the need for whole-system approaches to service redesign. Participants recommended system redesign that recognises the specific needs of older people, but there was no consensus on underlying patient needs or specific service developments. Access to expertise in management of older and frailer patients was seen as a barrier to admission avoidance throughout the system. Providing access to expertise and leadership in care of frail older people across the admissions system presents a challenge for service managers and nurse educators but is seen as a prerequisite for effective admission avoidance. System redesign to meet the needs of frail older people requires agreement on causes of avoidable admission and underlying patient needs. © 2014 John Wiley & Sons Ltd.

  5. Information Management of a Structured Admissions Interview Process in a Medical College with an Apple II System

    Science.gov (United States)

    O'Reilly, Robert; Fedorko, Steve; Nicholson, Nigel

    1983-01-01

    This paper describes a structured interview process for medical school admissions supported by an Apple II computer system which provides feedback to interviewers and the College admissions committee. Presented are the rationale for the system, the preliminary results of analysis of some of the interview data, and a brief description of the computer program and output. The present data show that the structured interview yields very high interrater reliability coefficients, is acceptable to the medical school faculty, and results in quantitative data useful in the admission process. The system continues in development at this time, a second year of data will be shortly available, and further refinements are being made to the computer program to enhance its utilization and exportability.

  6. Marketing in Admissions: The Information System Approach.

    Science.gov (United States)

    Wofford, O. Douglas; Timmerman, Ed

    1982-01-01

    A marketing information system approach for college admissions is outlined that includes objectives, information needs and sources, a data collection format, and information evaluation. Coordination with other institutional information systems is recommended. (MSE)

  7. Evaluating the Predictive Validity of Graduate Management Admission Test Scores

    Science.gov (United States)

    Sireci, Stephen G.; Talento-Miller, Eileen

    2006-01-01

    Admissions data and first-year grade point average (GPA) data from 11 graduate management schools were analyzed to evaluate the predictive validity of Graduate Management Admission Test[R] (GMAT[R]) scores and the extent to which predictive validity held across sex and race/ethnicity. The results indicated GMAT verbal and quantitative scores had…

  8. Admission Systems and Student Mobility: A Proposal for an EU-Wide Registry for University Admission

    Directory of Open Access Journals (Sweden)

    Cecile Hoareau McGrath

    2016-07-01

    Full Text Available Europe’s higher education systems are struggling to respond to the established mass demand for higher education, especially given the proportional decline in available resources per student and, more generally the demand for an ever longer education and reduction of the population of working age due to demographic decline. In addition, growing student mobility puts pressure on admission systems to set up relevant procedures for applicants who wish to enter a country. Admission systems to higher education constitute one key element in the mitigation of these challenges. Admissions can regulate student flows, and play a key role in guaranteeing the acquisition of skills in higher education by matching student profiles to their desired courses of study. This article puts European admission systems in perspective. The issue of regulation of student mobility is topical, given the broader and salient discussion on migration flows in Europe. The article uses international comparisons with systems such as the US, Australia and Japan, to provide a critical overview of the role of admission systems in an often overlooked but yet fundamental part of the European Higher Education Area, namely student mobility. The paper also argues for the creation of an information-sharing EU registry on admissions practices for mobile students.

  9. Resource management in Diffserv measurement-based admission control PHR

    NARCIS (Netherlands)

    Westberg, L.; Heijenk, Geert; Karagiannis, Georgios; Oosthoek, S.; Partain, D.; Rexhepi, Vlora; Szabo, R.; Wallentin, P.; El Allali, H.

    2002-01-01

    The purpose of this draft is to present the Resource Management in Diffserv (RMD) Measurement-Based Admission Control (RIMA) Per Hop Reservation (PHR) protocol. The RIMA PHR protocol is used on a per-hop basis in a Differentiated Services (Diffserv) domain and extends the Diffserv Per Hop Behavior

  10. Power Admission Control with Predictive Thermal Management in Smart Buildings

    DEFF Research Database (Denmark)

    Yao, Jianguo; Costanzo, Giuseppe Tommaso; Zhu, Guchuan

    2015-01-01

    This paper presents a control scheme for thermal management in smart buildings based on predictive power admission control. This approach combines model predictive control with budget-schedulability analysis in order to reduce peak power consumption as well as ensure thermal comfort. First...

  11. Admission Control and Interference Management in Dynamic Spectrum Access Networks

    Directory of Open Access Journals (Sweden)

    Jorge Martinez-Bauset

    2010-01-01

    Full Text Available We study two important aspects to make dynamic spectrum access work in practice: the admission policy of secondary users (SUs to achieve a certain degree of quality of service and the management of the interference caused by SUs to primary users (PUs. In order to limit the forced termination probability of SUs, we evaluate the Fractional Guard Channel reservation scheme to give priority to spectrum handovers over new arrivals. We show that, contrary to what has been proposed, the throughput of SUs cannot be maximized by configuring the reservation parameter. We also study the interference caused by SUs to PUs. We propose and evaluate different mechanisms to reduce the interference, which are based on simple spectrum access algorithms for both PUs and SUs and channel repacking algorithms for SUs. Numerical results show that the reduction can be of one order of magnitude or more with respect to the random access case. Finally, we propose an adaptive admission control scheme that is able to limit simultaneously the forced termination probability of SUs and what we define as the probability of interference. Our scheme does not require any configuration parameters beyond the probability objectives. Besides, it is simple to implement and it can operate with any arrival process and distribution of the session duration.

  12. Using Lean Management to Reduce Emergency Department Length of Stay for Medicine Admissions.

    Science.gov (United States)

    Allaudeen, Nazima; Vashi, Anita; Breckenridge, Julia S; Haji-Sheikhi, Farnoosh; Wagner, Sarah; Posley, Keith A; Asch, Steven M

    The practice of boarding admitted patients in the emergency department (ED) carries negative operational, clinical, and patient satisfaction consequences. Lean tools have been used to improve ED workflow. Interventions focused on reducing ED length of stay (LOS) for admitted patients are less explored. To evaluate a Lean-based initiative to reduce ED LOS for medicine admissions. Prospective quality improvement initiative performed at a single university-affiliated Department of Veterans Affairs (VA) medical center from February 2013 to February 2016. We performed a Lean-based multidisciplinary initiative beginning with a rapid process improvement workshop to evaluate current processes, identify root causes of delays, and develop countermeasures. Frontline staff developed standard work for each phase of the ED stay. Units developed a daily management system to reinforce, evaluate, and refine standard work. The primary outcome was the change in ED LOS for medicine admissions pre- and postintervention. ED LOS at the intervention site was compared with other similar VA facilities as controls over the same time period using a difference-in-differences approach. ED LOS for medicine admissions reduced 26.4%, from 8.7 to 6.4 hours. Difference-in-differences analysis showed that ED LOS for combined medicine and surgical admissions decreased from 6.7 to 6.0 hours (-0.7 hours, P = .003) at the intervention site compared with no change (5.6 hours, P = .2) at the control sites. We utilized Lean management to significantly reduce ED LOS for medicine admissions. Specifically, the development and management of standard work were key to sustaining these results.

  13. Surgical management of colonic volvulus during same hospital admission

    International Nuclear Information System (INIS)

    Alam, Mohammed K.; Fahim, F.; Qazi, Shabir A.; Al-Akeely, Mohammad H.A.; Al-Dossary, Nasser F.

    2009-01-01

    Objective was to study the local patient profile, diagnostic methods and treatment outcome in patients with large bowel volvulus to recommend a management plan. A retrospective study of patient's record with a final diagnosis of large bowel volvulus treated at King Saud Medical Complex, Riyadh, Saudi Arabia between January 2000 and December 2007 were performed for patient demography, clinical presentations, co-morbidity, diagnostic methods, anatomical types, management and outcome. Forty-two patients with large bowel volvulus were reviewed. They presented 8.5% of all intestinal obstructions treated. Most had sigmoid volvulus (83%), were less than 60 years of age and were male. Recognized risk factors were present in 12 (29%) patients. Diagnosis was suspected on plain abdominal x-ray in 28 patients (69%), although the characteristic signs of omega and coffee bean were seen only in 16 patients. Eight patients required emergency surgery. Endoscopic decompression was successful in 34 patients, followed by a definitive surgery in 24 patients. Seven patients refused surgery; 3 of them were readmitted with recurrence and were operated. Three patients were unfit for surgery. There were 3 deaths. Large bowel volvulus is uncommon in this area. Abdominal distension with pain, constipation and characteristic gas pattern in plain x-ray can help diagnose most cases. Decompression can be achieved in most patients with sigmoid volvulus, followed by surgery during the same hospital admission. Transverse colon and cecal volvulus usually need emergency surgery. (author)

  14. New degradation call admission control for increasing WCDMA system capacity

    Institute of Scientific and Technical Information of China (English)

    Liu Ningqing; Lu Zhi; Gu Xuemai

    2006-01-01

    Propose a new degradation call admission control(DCAC)scheme, which can be used in wideband code division multiple access communication system. So-called degradation is that non-real time call has the characteristic of variable bit rate, so decreasing its bit rate can reduce the load of the system, consequently the system can admit new call which should be blocked when the system is close to full load, therefore new call's access probability increases. This paper brings forward design project and does system simulation, simulation proves that DCAC can effectively decrease calls' blocking probability and increase the total number of the on-line users.

  15. Management of thallium poisoning in patients with delayed hospital admission.

    Science.gov (United States)

    Sun, Tong-Wen; Xu, Qing-Yan; Zhang, Xiao-Juan; Wu, Qiong; Liu, Zhang-Suo; Kan, Quan-Cheng; Sun, Cheng-Ye; Wang, Lexin

    2012-01-01

    To describe the clinical features and management of thallium poisoning in patients with delayed hospital admission. Fourteen patients (median age 36 years) were admitted 9-19 days after ingesting food poisoned with thallium. Clinical and laboratory data, including blood and urine thallium concentrations, were collected. Patients were treated with oral Prussian blue, a chelating agent sodium dimercaptosulfonate, and hemodialysis. All patients experienced a triad of symptoms of acute gastrointestinal upset, painful combined polyneuropathy, and hair loss after consuming poisoned food. Fatigue and skin pigmentation were observed in all patients. Abnormal liver function tests were found in 6 (42.9%) and delirium and coma were identified in 4 (28.6%). Two weeks after the poisoning, the blood and urine thallium concentration ranged from 219.0 to 1414.4 μg/L (median: 535.3) and 956.5 to 11285.0 μg/L (median: 7460.0), respectively. One patient (7.1%) with a previous history of pulmonary fibrosis died of respiratory failure in hospital. Symptoms were improved and blood or urine thallium levels were normalized in the remaining 13 patients before discharge. After a 6.5 ± 1-month follow-up, 1 patient (7.1%) developed deep venous thrombosis in the left lower limb. In another patient (7.1%), numbness in the lower limbs remained. Acute thallium poisoning is commonly manifested by gastrointestinal upset, painful polyneuropathy, and significant hair loss. Treatment strategies included Prussian blue and hemodialysis, which were associated with a good outcome in this case series.

  16. Crossing the GEM Frontier: Graduate Admissions Professionals' Participation in Enrollment Management

    Science.gov (United States)

    Campbell, C. Dean; Smith, Jahmaine

    2014-01-01

    Using qualitative inquiry and professional socialization as a framework to draw meaning from the work experiences of graduate admissions professionals, this project examines individual beliefs and organizational behaviors as they relate to enrollment management.

  17. Cross-Layer Admission Control Policy for CDMA Beamforming Systems

    Directory of Open Access Journals (Sweden)

    Sheng Wei

    2007-01-01

    Full Text Available A novel admission control (AC policy is proposed for the uplink of a cellular CDMA beamforming system. An approximated power control feasibility condition (PCFC, required by a cross-layer AC policy, is derived. This approximation, however, increases outage probability in the physical layer. A truncated automatic retransmission request (ARQ scheme is then employed to mitigate the outage problem. In this paper, we investigate the joint design of an AC policy and an ARQ-based outage mitigation algorithm in a cross-layer context. This paper provides a framework for joint AC design among physical, data-link, and network layers. This enables multiple quality-of-service (QoS requirements to be more flexibly used to optimize system performance. Numerical examples show that by appropriately choosing ARQ parameters, the proposed AC policy can achieve a significant performance gain in terms of reduced outage probability and increased system throughput, while simultaneously guaranteeing all the QoS requirements.

  18. Admissible perturbations and false instabilities in PT -symmetric quantum systems

    Science.gov (United States)

    Znojil, Miloslav

    2018-03-01

    One of the most characteristic mathematical features of the PT -symmetric quantum mechanics is the explicit Hamiltonian dependence of its physical Hilbert space of states H =H (H ) . Some of the most important physical consequences are discussed, with emphasis on the dynamical regime in which the system is close to phase transition. Consistent perturbation treatment of such a regime is proposed. An illustrative application of the innovated perturbation theory to a non-Hermitian but PT -symmetric user-friendly family of J -parametric "discrete anharmonic" quantum Hamiltonians H =H (λ ⃗) is provided. The models are shown to admit the standard probabilistic interpretation if and only if the parameters remain compatible with the reality of the spectrum, λ ⃗∈D(physical ) . In contradiction to conventional wisdom, the systems are then shown to be stable with respect to admissible perturbations, inside the domain D(physical ), even in the immediate vicinity of the phase-transition boundaries ∂ D(physical ) .

  19. Opioid management strategy decreases admissions in high-utilizing adults with sickle cell disease.

    Science.gov (United States)

    Mager, Amy; Pelot, Kristin; Koch, Kathryn; Miller, Lawrence; Hubler, Collin; Ndifor, Anisah; Coan, Canice; Leonard, Cynthia; Field, Joshua J

    A subset of adults with sickle cell disease (SCD) heavily utilizes the emergency department (ED) and hospital. The objective of our study was to determine the efficacy of a multidisciplinary strategy to address unmet needs in highly utilizing adults with SCD. In a prospective study, adults with SCD with ≥10 admissions per year were assessed by a multidisciplinary team for gaps in medical, social, and psychological care. Thereafter, the team decided upon the subject's predominant domain that drove admissions and instituted an interventional plan. All plans included an opioid management strategy. Preintervention and postintervention admission rate, as well as opioid use, was compared. Twelve subjects were enrolled. Median rate of ED and hospital admissions preintervention was 25 per year. The predominant domains identified were social needs (n = 6), psychological disorder (n = 1), and substance use disorder (n = 5). Multifaceted interventional plans were developed to address a wide range of gaps in care, but an opioid management strategy was the only intervention successfully completed. Even so, when the preintervention versus postintervention admission rate was compared, regardless of the domain, there was a 40 percent decline in hospital admissions (p = 0.03). Consistent with the successful implementation of an opioid management plan, the decrease in admissions was accompanied by a 37 percent decrease in intravenous opioid use (p = 0.02) and 10 percent decrease in oral opioid use (p = 0.04). An opioid management strategy, as part of a larger effort to improve care for high-utilizing adults with SCD, decreased rate of admissions and opioid use.

  20. Impact of Admission Control Methods to the Traffic Management

    Directory of Open Access Journals (Sweden)

    Filip Chamraz

    2015-01-01

    Full Text Available The paper deals with Admission control methods (AC in IMS networks (IP multimedia subsystem as one of the elements that help ensure QoS (Quality of service. In the paper we are trying to choose the best AC method for selected IMS network node to allow access to the greatest number of users. Of the large number of methods that were tested and considered good we chose two. The paper compares Gaussian approximation method and one of the measurement based method, specifically „Measured Sum“. Both methods estimate effective bandwidth to allow access for the greatest number of users/devices and allow them access to prepaid services or multimedia content.

  1. COPD prevalence and hospital admissions in Galicia (Spain). An analysis using the potential of new health information systems.

    Science.gov (United States)

    Barbosa-Lorenzo, R; Ruano-Ravina, A; Fernández-Villar, A; López-Pardo, E; Carballeira-Roca, C; Barros-Dios, J M

    2018-05-05

    Chronic obstructive pulmonary disease (COPD) is a major public health problem. The aim of this study was to ascertain the prevalence of COPD and whether such prevalence was positively or negatively associated with COPD admissions, using all the data of a regional health care system. We designed a descriptive cross-sectional study which included all subjects aged over 45 years, diagnosed with COPD in primary care in 2013. We also calculated the number of such patients who had a record of hospital admissions due to this disease. COPD prevalence and incidence of admissions were calculated. Poisson regression models were then used to analyse the association between cases with diagnosis of COPD and admissions due to COPD, by sex, adjusting for socio-demographic variables and distance to hospital. Sensitivity subanalyses were performed by reference to the respective municipal rurality indices. Median municipal prevalence of COPD was 5.29% in men and 2.19% in women. Among patients with COPD, 28.22% of men and 16.00% of women had at least one hospital admission. The relative risk of admission per unit of the standardised prevalence ratio was 0.37 (95% CI 0.34-0.41) for men and 0.39 (95% CI 0.34-0.45) for women. There is a significant negative association between COPD prevalence and hospital admissions due to this disease. The proportion of admissions is lower in municipalities lying furthest from hospitals. There is considerable municipal variability in terms of COPD prevalence and proportion of admissions. In-depth attention should be given to disease-management training programmes. Copyright © 2018 Sociedade Portuguesa de Pneumologia. Published by Elsevier España, S.L.U. All rights reserved.

  2. Effect of Medicaid disease management programs on emergency admissions and inpatient costs.

    Science.gov (United States)

    Conti, Matthew S

    2013-08-01

    To determine the impact of state Medicaid diabetes disease management programs on emergency admissions and inpatient costs. National InPatient Sample sponsored by the Agency for Healthcare Research and Quality Project for the years from 2000 to 2008 using 18 states. A difference-in-difference methodology compares costs and number of emergency admissions for Washington, Texas, and Georgia, which implemented disease management programs between 2000 and 2008, to states that did not undergo the transition to managed care (N = 103). Costs and emergency admissions were extracted for diabetic Medicaid enrollees diagnosed in the reform and non-reform states and collapsed into state and year cells. In the three treatment states, the implementation of disease management programs did not have statistically significant impacts on the outcome variables when compared to the control states. States that implemented disease management programs did not achieve improvements in costs or the number of emergency of admissions; thus, these programs do not appear to be an effective way to reduce the burden of this chronic disease. © Health Research and Educational Trust.

  3. Quality of Education Outcomes: The Role of the Graduate Management Admission Test

    Science.gov (United States)

    Wamala, Robert; Buyinza, Mukadasi

    2013-01-01

    Although the Graduate Management Admission Test (GMAT) is considered by leading business institutions worldwide as a predictor of success in graduate programs, an issue of contention is whether the introduction of the examination enhances the quality of education outcomes. This study sought to obtain an understanding of this issue, focusing on…

  4. AN AUTOMATED IMPLEMENTATION OF INDIAN UNIVERSITY ADMISSION SYSTEM USING ARTIFICIAL NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    B. Sankarasubramanian

    2014-04-01

    Full Text Available Indian University Admission is a complex phenomenon encompassing various factors both tangible and intangible. Apart from Merit - Caste, Community and Religion play a crucial role in getting admission to various courses offered by Universities. The Single Window Admission System followed by almost all Government Universities (for example: Anna University, Chennai is, so far, the best practice to offer Admission sought by student community. But, still, in Private Universities, the Admission process is done manually since number of students seeking a course is smaller in size. This manual process is fraught with some drawbacks: such as slower in time, cumbersome and costlier, bias by the Admission Officer, manual errors while processing, due to influence exercised by powerful people qualified students not getting their course of choice and unqualified students getting into their course of willingness and etc. This paper addresses these problems via neural network architecture based Admission system which will eliminate all the pitfalls and drawbacks inherent in the current system and offers a smooth, clearer, easier and cost effective way of student admission system implementation in Indian Universities.

  5. Multi-Stage Admission Control for Load Balancing in Next Generation Systems

    DEFF Research Database (Denmark)

    Mihovska, Albena D.; Anggorojati, Bayu; Luo, Jijun

    2008-01-01

    This paper describes a load-dependent multi-stage admission control suitable for next generation systems. The concept uses decision polling in entities located at different levels of the architecture hierarchy and based on the load to activate a sequence of actions related to the admission...

  6. Testing for Bias against Female Test Takers of the Graduate Management Admissions Test and Potential Impact on Admissions to Graduate Programs in Business.

    Science.gov (United States)

    Wright, Robert E.; Bachrach, Daniel G.

    2003-01-01

    Graduate Management Admission Test (GMAT) scores and grade point average in graduate core courses were compared for 190 male and 144 female business administration students. No significant differences in course performance were found, but males had been admitted with significantly higher GMAT scores, suggesting a bias against women. (Contains 27…

  7. Traffic Management by Using Admission Control Methods in Multiple Node IMS Network

    Directory of Open Access Journals (Sweden)

    Filip Chamraz

    2016-01-01

    Full Text Available The paper deals with Admission Control methods (AC as a possible solution for traffic management in IMS networks (IP Multimedia Subsystem - from the point of view of an efficient redistribution of the available network resources and keeping the parameters of Quality of Service (QoS. The paper specifically aims at the selection of the most appropriate method for the specific type of traffic and traffic management concept using AC methods on multiple nodes. The potential benefit and disadvantage of the used solution is evaluated.

  8. Effectiveness of case management in the prevention of COPD re-admissions: a pilot study.

    Science.gov (United States)

    van Eeden, Annelies E; van de Poll, Ingrid; van Vulpen, Gertrud; Roldaan, Tim; Wagenaar, Wies; Boland, Melinde R S; Wolterbeek, Ron; Chavannes, Niels H

    2017-11-25

    Chronic obstructive pulmonary disease (COPD) exacerbations are associated with high disease burden and costs, especially in the case of hospitalizations. The overall number of hospital admissions due to exacerbations of COPD has increased. It is remarkable that re-admissions account for a substantial part of these hospitalizations. This pilot study investigates the use of case management to reduce re-admissions due to COPD. COPD patients with more than one hospitalization per year due to an exacerbation were included. The participants (n = 10) were closely monitored and intensively coached for 20 weeks after hospitalization. The case manager provided care in a person-focused manner. The case manager informed and supported the patient, took action when relapse threatened, coordinated and connected primary and secondary care. Data of 12 months before and after start of the intervention were compared. Primary outcome was the difference in number of hospitalizations. Secondary outcomes were health-related quality of life (measured by the Clinical COPD Questionnaire, CCQ) and dyspnoea (measured by the MRC Dyspnoea Scale). The incidence rate of hospitalizations was found to be 2.25 times higher (95% confidence interval [CI] 1.3-3.9; P = 0.004) 12 months before compared with 12 months after the start of case management. COPD patients had a mean CCQ score of 3.3 (95% CI 2.8-3.8) before and 2.4 (95% CI 1.9-2.8) after 20 weeks of case management; a difference of 1.0 (95% CI 0.4-1.6; P = 0.001). The mean MRC scores showed no significant differences before (4.3; 95% CI 3.7-4.9) and after the case management period (3.9; 95% CI 3.2-4.6); a difference of 0.4 (95% CI - 0.1 to 0.9; P = 0.114). This pilot study shows that the number of COPD hospital re-admissions decreased significantly after the introduction of a case manager. Moreover, there was an improvement in patient-reported health-related quality of life.

  9. Patient participation in quality pain management during an acute care admission.

    Science.gov (United States)

    McTier, Lauren J; Botti, Mari; Duke, Maxine

    2014-04-01

    The objective of the study was to explore patient participation in the context of pain management during a hospital admission for a cardiac surgical intervention of patients with cardiovascular disease. This is a single-institution study, with a case-study design. The unit of analysis was a cardiothoracic ward of a major metropolitan, tertiary referral hospital in Melbourne, Australia. Multiple methods of data collection were used including preadmission and predischarge patient interviews (n=98), naturalistic observations (n=48), and focus group interviews (n=2). Patients' preference for participation in pain management was not always commensurate with their involvement in pain management. Patients displayed a greater understanding of their role in pain management in terms of reporting pain and the use of multimodal analgesics after surgery. The majority of patients, however, did not understand the importance of reporting pain to avoid complications. Patients had limited opportunity to participate in their pain management. On occasions in which clinicians did involve patients, the involvement appeared to be focused on reporting pain rather than treatment of pain. Patient participation in pain management during hospitalization is not optimal. This has implications for the quality of pain management patients receive. Higher engagement of patients in their pain management during hospitalization is required to ensure comfort, reduce potential for complications, and adequately prepare the patients to manage their pain following discharge from hospital.

  10. [Profile of heart failure according to the department of admission. Implications for multidisciplinary management].

    Science.gov (United States)

    Vicent, Lourdes; Ayesta, Ana; Vidán, María Teresa; Miguel-Yanes, José María de; García, Jorge; Tamargo, María; Gómez, Víctor; Véliz, Samuel; Fernández-Avilés, Francisco; Martínez-Sellés, Manuel

    Population aging has led to notable changes in heart failure admissions. The aim of this study was to analyse the characteristics, comorbidity, management, and outcomes of this patient population in three hospital departments. An analysis was made of a prospective register that included all patients admitted due to heart failure in Internal Medicine, Cardiology, and Geriatrics over a period of 45 days. Of a total of 235 patients, 124 (52.7%) were admitted to Internal Medicine, 83 (35.3%) to Cardiology, and 28 (11.9%) to Geriatrics. Mean age was 77.0±20.2 years (Cardiology 71.5±13.5; Internal Medicine 79.2±21.1; Geriatrics 89.9±5.1; prenal disease (89; 37.8%), and chronic obstructive pulmonary disease (65; 27.6%). Infections were the most common decompensating trigger in Internal Medicine (56; 45.2%), and there was often no trigger in Cardiology (45; 54.2%) and Geriatrics (14; 50.0%), p<.0001. The use of renin-angiotensin system inhibitors, beta-blockers, and spironolactone in patients with systolic dysfunction was higher in Cardiology. During the 45 days follow-up, 23 patients (9.9%) were readmitted, which was more frequent in Internal Medicine than in Cardiology (odds ratio 3.0 [95% confidence interval: 1.1 - 8.6], p=.03), with no other significant comparisons. Patients admitted due to decompensated heart failure are elderly and often have comorbidities. There are major differences between departments as regards age and clinical profile. Copyright © 2016 SEGG. Publicado por Elsevier España, S.L.U. All rights reserved.

  11. The impact of a proactive chronic care management program on hospital admission rates in a German health insurance society.

    Science.gov (United States)

    Hamar, Brent; Wells, Aaron; Gandy, William; Haaf, Andreas; Coberley, Carter; Pope, James E; Rula, Elizabeth Y

    2010-12-01

    Hospital admissions are the source of significant health care expenses, although a large proportion of these admissions can be avoided through proper management of chronic disease. In the present study, we evaluate the impact of a proactive chronic care management program for members of a German insurance society who suffer from chronic disease. Specifically, we tested the impact of nurse-delivered care calls on hospital admission rates. Study participants were insured individuals with coronary artery disease, heart failure, diabetes, or chronic obstructive pulmonary disease who consented to participate in the chronic care management program. Intervention (n  = 17,319) and Comparison (n  = 5668) groups were defined based on records of participating (or not participating) in telephonic interactions. Changes in admission rates were calculated from the year prior to (Base) and year after program commencement. Comparative analyses were adjusted for age, sex, region of residence, and disease severity (stratification of 3 [least severe] to 1 [most severe]). Overall, the admission rate in the Intervention group decreased by 6.2% compared with a 14.9% increase in the Comparison group (P  management care calls can help reduce hospital admissions among German health insurance members with chronic disease.

  12. [Evaluation of hospital admissions: admission guidelines implementation in a pediatric emergency department].

    Science.gov (United States)

    Katz, Manuel; Warshawsky, Sheila S; Rosen, Shirley; Barak, Nurit; Press, Joseph

    2004-10-01

    To develop and implement locally tailored pediatric admission guidelines for use in a pediatric emergency department and evaluate the appropriateness of admissions based on these guidelines. Our Study was based on the development of admission guidelines by senior physicians, using the Delphi Consensus Process, for use in the Pediatric Emergency Department (PED) at Soroka University Medical Center (Soroka). We evaluated the appropriateness of admissions to the pediatric departments of Soroka on 33 randomly selected days in 1999 and 2000 prior to guideline implementation and 30 randomly selected days in 2001, after guideline implementation. A total of 1037 files were evaluated. A rate of 12.4% inappropriate admissions to the pediatric departments was found based on locally tailored admission guidelines. There was no change in the rate of inappropriate admissions after implementation of admission guidelines in PED. Inappropriate admissions were associated with age above 3 years, hospital stay of two days or less and the season. The main reasons for evaluating an admission as inappropriate were that the admission did not comply with the guidelines and that the case could be managed in an ambulatory setting. There were distinctive differences in the characteristics of the Bedouin and Jewish populations admitted to the pediatric departments, although no difference was found in the rate of inappropriate admissions between these populations. Patient management in Soroka PED is tailored to the conditions of this medical center and to the characteristics of the population it serves. The admission guidelines developed reflect these special conditions. Lack of change in the rate of inappropriate admissions following implementation of the guidelines indicates that the guidelines reflect the physicians' approach to patient management that existed in Soroka PED prior to guideline implementation. Hospital admission guidelines have a role in the health management system; however

  13. QoS-Guaranteed Admission Control for OFDMA-based Systems

    DEFF Research Database (Denmark)

    Ramkumar, Venkata; Anggorojati, Bayu; Lucian, Stefan P. Andrei

    2010-01-01

    This paper proposes a novel admission control (AC) algorithm for guaranteed quality of service (QoS) to all users. The proposed solution provides better utilization of system capacity using adaptive modulation (AM). A scheduler based on a per user priority function is also given in this paper. Th...

  14. A Reinforcement Learning Approach to Call Admission Control in HAPS Communication System

    Directory of Open Access Journals (Sweden)

    Ni Shu Yan

    2017-01-01

    Full Text Available The large changing of link capacity and number of users caused by the movement of both platform and users in communication system based on high altitude platform station (HAPS will resulting in high dropping rate of handover and reduce resource utilization. In order to solve these problems, this paper proposes an adaptive call admission control strategy based on reinforcement learning approach. The goal of this strategy is to maximize long-term gains of system, with the introduction of cross-layer interaction and the service downgraded. In order to access different traffics adaptively, the access utility of handover traffics and new call traffics is designed in different state of communication system. Numerical simulation result shows that the proposed call admission control strategy can enhance bandwidth resource utilization and the performances of handover traffics.

  15. The Validity of Graduate Management Admission Test Scores: A Summary of Studies Conducted from 1997 to 2004

    Science.gov (United States)

    Talento-Miller, Eileen; Rudner, Lawrence M.

    2008-01-01

    The validity of Graduate Management Admission Test (GMAT) scores is examined by summarizing 273 studies conducted between 1997 and 2004. Each of the studies was conducted through the Validity Study Service of the test sponsor and contained identical variables and statistical methods. Validity coefficients from each of the studies were corrected…

  16. Cost of management in epistaxis admission: Impact of patient and hospital characteristics.

    Science.gov (United States)

    Goljo, Erden; Dang, Rajan; Iloreta, Alfred M; Govindaraj, Satish

    2015-12-01

    To investigate patient and hospital characteristics associated with increased cost and length of stay in the inpatient management of epistaxis. Retrospective cross-sectional study of the 2008 to 2012 National (Nationwide) Inpatient Sample. Patient and hospital characteristics of epistaxis admissions were analyzed. Multiple linear regression analysis was used to ascertain variables associated with increased cost and length of hospital stay. Variables significantly associated with high cost were further analyzed to determine the contribution of operative intervention and total procedures to cost. A total of 16,828 patients with an admitting diagnosis of epistaxis were identified. The average age was 67.5; 52.3% of the patients were male; 73.3% of the patients were Caucasian; and 70.7% of the hospital stays were government funded. The average length of stay was 3.24 days, and average hospitalization cost was $6,925. Longer length of stay was associated with black race, alcohol abuse, sinonasal disease, renal disease, Medicaid, and care at a northeastern U.S. hospital. Increased hospitalization costs of > $1,000 were associated with Asian/Pacific Islander race; sinonasal disease; renal disease; top income quartile; and care at urban teaching, northeastern, and western hospitals in the United States. High costs were predicted by procedural intervention in patients with comorbid alcohol abuse, sinonasal disease, renal disease, patients with private insurance, and patients managed at large hospitals. Although hospitalization costs are complex and multifactorial, we were able to identify patient and hospital characteristics associated with high costs in the management of epistaxis. Early identification and intervention, combined with implementation of targeted hospital management protocols, may improve outcomes and reduce financial burden. 2C. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  18. Quality management system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mu Sung

    2009-08-15

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  19. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  20. Impact of Quota System and Catchment Area Policy on the University Admissions in North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Joachim Chinweike Omeje

    2016-06-01

    Full Text Available The quota system and the catchment areas are federal government policies formulated to bridge the gap between the educationally developed states and the educationally less developed states. Sequel to the enactment of these policies, government established several universities across the country to create equal opportunity for all candidates. In spite of the astronomical growth of the universities in Nigeria, both the federal and the state governments have not been able to contend with the surging demand for the university education, hence the adoption of the quota system and catchment area policies. Serious concerns were expressed by relevant stakeholders on their perceived impact of the quota system and the catchment area on admissions into the federal and state universities in North Central Nigeria. This study therefore examined the impact of the quota system and catchment area policies on students’ admissions in North Central Nigeria. A research question and a null hypothesis guided the study. Descriptive survey design was adopted for the study. The population for the study was 14,347 staff in the federal and state universities in North Central Nigeria. A sample of 1,435 was drawn through stratified proportionate sampling technique. Data were collected using questionnaire and interviews. Mean scores and standard deviations were used to answer the research question, whereas t-test statistics were used to test the hypothesis at 0.05 level of significance. The findings of the results showed, among others, that the impact of the quota system and catchment area policies on students’ admission was to a high extent.

  1. On the use of Disease Staging for clinical management: analysis of untimely admissions in the Abruzzo Region, Italy

    Directory of Open Access Journals (Sweden)

    Lamberto Manzoli

    2004-12-01

    Full Text Available

    Background and aims. The process of decentralization which recently occurred within the Italian National Health Service has transferred substantial responsibility and authority for health care administration to the individual regions. The project is aimed at developing regional benchmarks that can be used as a part of an ongoing system for analysis of resource use and quality of care in the Abruzzo Region of Italy.

    Methods. All 286 924 hospital admissions for the year 2001 in the region were analysed. Three diseases were chosen for in-depth review: diabetes mellitus; cholecystitis/cholelithiasis; and bacterial pneumonia. There were a total of 9391 admissions for these diagnoses. Severity, length of hospital stay and hospital mortality were analysed using Disease Staging methodology. In addition, the timeliness of hospitalisation was assessed by grouping admissions in three categories: premature or medically unnecessary, timely and late.

    Results. The rate of medically unnecessary admissions for diabetes mellitus was 72% throughout the region, and the percentage of late hospitalisations for cholelithiasis/cholecystitis was 43%. For both diseases, there were significant variations across Local Health Units in the proportion of late and early admissions. The rate of timely hospitalisations for bacterial pneumonia was higher than 86%.

    Conclusion. The analysis of discharge abstract data using Disease Staging revealed that in the Abruzzo region there are problems of inappropriate hospital admission, both early and late, for all diseases examined excepted bacterial pneumonia.

    Data confirmed the validity of Disease Staging to compare the performance of diverse hospitals in terms of length of stay and in-hospital mortality.

  2. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  3. Small supermarket management system

    Institute of Scientific and Technical Information of China (English)

    曹正

    2016-01-01

    This system USES the Java language in the MyEclipse platform development tool, SQL2005 as the database platform for data and data, the SQL2005 required for the user operating system. It mainly implements the daily management of goods, including purchase management, inventory management, sales management, personnel management and supplier management. The system can also complete the functions of browsing, querying, adding, deleting and modifying relevant information. This topic is the core of the stock management, inventory management and sales management, at the same time, the system also has the full user management and permissions management function..

  4. [Evaluations by hospital-ward physicians of patient care management quality for patients hospitalized after an emergency department admission].

    Science.gov (United States)

    Bartiaux, M; Mols, P

    2017-01-01

    patient management in the acute and sub-acute setting of an Emergency Department is challenging. An assessment of the quality of provided care enables an evaluation of failings. It contributes to the identification of areas for improvement. to obtain an analysis, by hospital-ward physicians, of adult patient care management quality, as well as of the correctness of diagnosis made during emergency admissions. To evaluate the consequences of inadequate patient care management on morbidity, mortality and cost and duration of hospitalization. prospective data analysis obtained between the 1/12/2009 and the 21/12/2009 from physicians using a questionnaire on adult-patient emergency admissions and subsequent hospitalization. questionnaires were completed for 332 patients. Inadequate management of patient care were reported for 73/332 (22 %) cases. Incorrect diagnoses were reported for 20/332 (6 %) cases. 35 cases of inadequate care management (10.5 % overall) were associated with morbidity (34 cases) or mortality (1 case), including 4 cases (1.2 % ) that required emergency intensive-care or surgical interventions. this quality study analyzed the percentage of patient management cases and incorrect diagnoses in the emergency department. The data for serious outcome and wrong diagnosis are comparable with current literature. To improve performance, we consider the process for establishing a diagnosis and therapeutic care.

  5. Transfer Innovations Fund Updating Project. BC Council on Admissions and Transfer. Tourism Management Articulation

    Science.gov (United States)

    British Columbia Council on Admissions and Transfer, 2010

    2010-01-01

    In 2008, a number of changes were identified that expanded the scope of the updating required for Block Transfer for tourism management as follows: a new core curriculum for diploma programs; the need for expanded information on diploma to diploma transfer; and, a growing need for an expanded system of transfer identified in Campus 2020…

  6. 44 CFR 68.9 - Admissible evidence.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Admissible evidence. 68.9 Section 68.9 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... admissible. (b) Documentary and oral evidence shall be admissible. (c) Admissibility of non-expert testimony...

  7. Admission Control of Integrated Voice and Data CDMA/TDD System Considering Asymmetric Traffic and Power Limit

    Institute of Scientific and Technical Information of China (English)

    CAOYanbo; ZHOUBin; LIChengshu

    2004-01-01

    In this paper, we research an admission control scheme of integrated voice and data CDMA/TDD (Code division multiple access/Time division duplex) system considering asymmetric traffic and power limit. A new user can access the system only if the outage probabilities it experiences on the uplink and downlink time slots are below a threshold value. Based on the power limit the results show the voice and data blocking probabilities under different cell coverage~ arrival rates and various uplink/downlink time slot allocation patterns. Furthermore, multicode and multislot schemes are also evaluated under the presented admission control scheme.

  8. A new approach to scoring systems to improve identification of acute medical admissions that will require critical care.

    Science.gov (United States)

    Carmichael, H A; Robertson, E; Austin, J; McCruden, D; Messow, C M; Belcher, P R

    2011-11-01

    Removal of the intensive care unit (ICU) at the Vale of Leven Hospital mandated the identification and transfer out of those acute medical admissions with a high risk of requiring ICU. The aim of the study was to develop triaging tools that identified such patients and compare them with other scoring systems. The methodology included a retrospective analysis of physiological and arterial gas measurements from 1976 acute medical admissions produced PREEMPT-1 (PRE-critical Emergency Medical Patient Triage). A simpler one for ambulance use (PREAMBLE-1 [PRE-Admission Medical Blue-Light Emergency]) was produced by the addition of peripheral oxygen saturation to a modification of MEWS (Modified Early Warning Score). Prospective application of these tools produced a larger database of 4447 acute admissions from which logistic regression models produced PREEMPT-2 and PREAMBLE-2, which were then compared with the original systems and seven other early warning scoring systems. Results showed that in patients with arterial gases, the area under the receiver operator characteristic curve was significantly higher in PREEMPT-2 (89·1%) and PREAMBLE-2 (84.4%) than all other scoring systems. Similarly, in all patients, it was higher in PREAMBLE-2 (92·4%) than PREAMBLE-1 (88·1%) and the other scoring systems. In conclusion, risk of requiring ICU can be more accurately predicted using PREEMPT-2 and PREAMBLE-2, as described here, than by other early warning scoring systems developed over recent years.

  9. Credit Management System

    Data.gov (United States)

    US Agency for International Development — Credit Management System. Outsourced Internet-based application. CMS stores and processes data related to USAID credit programs. The system provides information...

  10. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  11. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  12. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  13. Business advertisements management system

    OpenAIRE

    Rekel, Ernest

    2017-01-01

    Business Advertisements Management System The main goal of the project was to create a business advertisements management system, where users could easily create and find business advertisements. To accomplish this goal exist- ing systems were analyzed as well as their limitations. The end result is a working system which is able to store and proccess huge amount of data.

  14. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  15. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  16. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  17. Management Information Systems Research.

    Science.gov (United States)

    Research on management information systems is illusive in many respects. Part of the basic research problem in MIS stems from the absence of standard...decision making. But the transition from these results to the realization of ’satisfactory’ management information systems remains difficult indeed. The...paper discusses several aspects of research on management information systems and reviews a selection of efforts that appear significant for future progress. (Author)

  18. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  19. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  20. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  1. A Computerized Hospital Patient Information Management System

    Science.gov (United States)

    Wig, Eldon D.

    1982-01-01

    The information processing needs of a hospital are many, with varying degrees of complexity. The prime concern in providing an integrated hospital information management system lies in the ability to process the data relating to the single entity for which every hospital functions - the patient. This paper examines the PRIMIS computer system developed to accommodate hospital needs with respect to a central patient registry, inpatients (i.e., Admission/Transfer/Discharge), and out-patients. Finally, the potential for expansion to permit the incorporation of more hospital functions within PRIMIS is examined.

  2. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  3. Lithium battery management system

    Science.gov (United States)

    Dougherty, Thomas J [Waukesha, WI

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  4. Effectiveness of an Integrated Tertiary Software Mobile Information System for Student Registration and Admission at a University in Gauteng

    Directory of Open Access Journals (Sweden)

    Frans MASHABELA

    2017-07-01

    Full Text Available This study investigates whether the new online registration and admission system implemented at a Tertiary Institution in Gauteng, South Africa, was successful and effective. The Institution under study is the first in South Africa to implement this new online registration system from the 3rd of January 2013 using a system called the Integrated Tertiary Software (ITS Mobile information system. The information system enables students to apply online without physically visiting the institution and provides the status of their registration and admission applications via their smartphones. A total of one hundred 1st year students and ten personnel were sampled to respond to self-completed questionnaires. The efficiency of this new online system was evaluated using the Technology Acceptance Model (TAM, the Web of System Performance (WOSP model and the DeLone and McLean IS Success model as well as the indicators of system ineffectiveness and attributes on the basis of which an information system was evaluated. Key findings emerging from the data analysis and interpretation show that the new online system met the expectations of most staff and students with the exception of few staff members and students. The findings show that the investment made on the new online registration system is benefiting the University and students. The implementation of the new online registration and admission system was a success to a larger extent because the expectations of most users were met. The online system is effective as it was evaluated using the conventional measuring methods and resulted in positive outcomes.

  5. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  6. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  7. Spinal cord infarction: a rare cause of admission to Internal Medicine Departments but a condition with relevant systemic complications

    Directory of Open Access Journals (Sweden)

    Daniela Galimberti

    2013-04-01

    Full Text Available BACKGROUND Spinal cord infarction is a rare cause of admission to Internal Medicine Departments as it is of infrequent occurrence and it is usually addressed to Neurologic Units. Diagnosis at admission however may be challenging expecially in the elderly because of several co-morbidities and variable presentation. Clinical course is often complicated by autonomic, infective and cardiovascular problems as well as a long stay-in-bed period. Outcome is poor in case of severe motor, autonomic (bladder and bowel and sensitive impairment at presentation, it’s related to anatomic damage site and extension and it’s worse in case of anterior bilateral infarcts. CLINICAL CASE The authors describe the case of an 81- year-old woman who was admitted to an Internal Medicine Department because of cervical spinal cord infarction. The diagnostic evaluation as well as the management of cardiovascular, infective, rheumatologic and autonomic complications needed skillful internistic competence and a long in-hospital period. MR allowed a correct diagnosis a few hours after presentation, but the pathogenesis was never clearly established. The most invalidating symptoms were loss of bowel control lasting for several weeks during hospitalization and neuropathic pain still present at discharge. As for the outcome, the patient was able to go home after 3 months from admission able to walk with aids, with full bowel and bladder control and no sensitive impairment.

  8. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  9. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  10. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  11. Portfolio Management System

    Data.gov (United States)

    US Agency for International Development — PfMS is an implementation of WorkLenz. WorkLenz is USAID's portfolio management system tool. It is a commercially available, off-the-shelf (COTS) package that...

  12. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  13. Holdings Management System

    Data.gov (United States)

    National Archives and Records Administration — This system supports the physical management of permanent, hard-copy archival Records in the custody of National Archives and Records Administration program offices.

  14. Correspondence Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — CMS is EPA's correspondence tracking and workflow management system. It scans, logs, routes, tracks, and stores incoming and outgoing correspondence in all Program...

  15. Earned Value Management System

    Data.gov (United States)

    US Agency for International Development — EVMS is a system for measuring project performance and progress in an objective manner by supporting earned value management. EVMS has the ability to combine...

  16. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Jaerventausta, P.; Kaerenlampi, M.; Paulasaari, H. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1996-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  17. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P; Jaerventausta, P; Kaerenlampi, M; Paulasaari, H [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1997-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  18. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  19. Audit Management System

    CERN Document Server

    Alconada, Federico

    2015-01-01

    In the need of renewing their system, the Internal Audit department has given a proposal for building a new one. Taking into consideration the problems of their system they elaborated a requirement's list with the functionalities and features they were expecting from the new management system. This new system would be primarily for the use of the Internal Audit staff but it would also support the follow-up of internal audit recommendations by potentially all CERN staff members.

  20. Electrical distribution system management

    International Nuclear Information System (INIS)

    Hajos, L.; Mortarulo, M.; Chang, K.; Sparks, T.

    1990-01-01

    This paper reports that maintenance of electrical system data is essential to the operation, maintenance, and modification of a nuclear station. Load and equipment changes affect equipment sizing, available short-circuit currents and protection coordination. System parameters must be maintained in a controlled manner to enable evaluation of proposed modifications and provide adequate verification and traceability. For this purpose, Public Service Electric and Gas Company has implemented a Verified and Validated Electric Distribution System Management (EDSM) program at the Hope Creek and Salem Nuclear Power Stations. EDSM program integrates computerized configuration management of electrical systems with calculational software the Technical Standard procedures. The software platform is PC-based. The Database Manager and Calculational programs have been linked together through a user friendly menu system. The database management nodule enable s assembly and maintenance of databases for individual loads, buses, and branches within the electrical systems with system access and approval controlled through electronic security incorporated within the database manger. Reports drawn from the database serve as the as-built and/or as-designed record of the system configurations. This module also creates input data files of network parameters in a format readable by the calculational modules. Calculations modules provide load flow, voltage drop, motor starting, and short-circuit analyses, as well as dynamic analyses of bus transfers

  1. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  2. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  3. Admission Control for Multiservices Traffic in Hierarchical Mobile IPv6 Networks by Using Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    Jung-Shyr Wu

    2012-01-01

    Full Text Available CAC (Call Admission Control plays a significant role in providing QoS (Quality of Service in mobile wireless networks. In addition to much research that focuses on modified Mobile IP to get better efficient handover performance, CAC should be introduced to Mobile IP-based network to guarantee the QoS for users. In this paper, we propose a CAC scheme which incorporates multiple traffic types and adjusts the admission threshold dynamically using fuzzy control logic to achieve better usage of resources. The method can provide QoS in Mobile IPv6 networks with few modifications on MAP (Mobility Anchor Point functionality and slight change in BU (Binding Update message formats. According to the simulation results, the proposed scheme presents good performance of voice and video traffic at the expenses of poor performance on data traffic. It is evident that these CAC schemes can reduce the probability of the handoff dropping and the cell overload and limit the probability of the new call blocking.

  4. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P; Verho, P; Kaerenlampi, M; Pitkaenen, M [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion to the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. Nowadays the SCADA is the main computer system (and often the only) in the control center. However, the information displayed by the SCADA is often inadequate, and several tasks cannot be solved by a conventional SCADA system. A need for new computer applications in control center arises from the insufficiency of the SCADA and some other trends. The latter means that the overall importance of the distribution networks is increasing. The slowing down of load-growth has often made network reinforcements unprofitable. Thus the existing network must be operated more efficiently. At the same time larger distribution areas are for economical reasons being monitored at one control center and the size of the operation staff is decreasing. The quality of supply requirements are also becoming stricter. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the

  5. Materials management information systems.

    Science.gov (United States)

    1996-01-01

    The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The

  6. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  7. Anesthesia information management systems

    OpenAIRE

    Feri Štivan; Janez Benedik; Tomaž Lužar

    2014-01-01

    Introduction: The use of anesthesia information management systems (AIMS) is on the increase. This is particularly true for academic anesthesia departments. The main reasons for slow adoption of these systems in the past are financial barriers associated with implementation of these systems and their not so traditionally obvious potential to improve patient care. In addition, a major obstacle to acceptance of this technology is the concern of users over the impact of the electronic anesthesia...

  8. Advanced alarm management system

    International Nuclear Information System (INIS)

    Easter, J.R.

    1995-01-01

    The Westinghouse Advanced Alarm Management System (AWARE) is one of the Man-Machine Design Interfaces (MMI) which has great flexibility with regard to hardware type and configuration, alarm system concept, plant scope, engineering scope and installation. The AWARE System provides the capability to better manage the quantity prioritization and presentation of real-time process alarm messages in the control room. The messages are specific, precise and dynamic. The AWARE System can provide a large reduction in the number of messages that the control room staff must address at any one time, thus making the alarm message system a useful tool for the operators during situations that normally produce a high volume of messages as well as improving the clarity of the presentation of process abnormalities during small disturbances. The operating staff is now provided with the basis for a better understanding of the current plant state and for taking the appropriate control actions. (2 refs., 3 figs.)

  9. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  10. Prevention of hospital payment errors and implications for case management: a study of nine hospitals with a high proportion of short-term admissions over time.

    Science.gov (United States)

    Hightower, Rebecca E

    2008-01-01

    medical advice) occurring during the baseline and remeasurement time frames was examined. The baseline period consisted of 1 month's claims-the complete month just prior to the start of approved project activities. Remeasurement was performed by each hospital and reported to the Quality Improvement Organization on a monthly basis following implementation of the hospital's quality improvement plan. Each hospital was required to provide a monthly remeasurement report by indicator until it had met its stated goal(s) for improvement for 2 consecutive months; therefore, each hospital completed its required monthly reporting for a specific indicator in a different month. Results were calculated for the following indicators: INDICATOR 1: Proportion of unnecessary short-term admissions = number of unnecessary short-term inpatient admissions/total short-term inpatient admissions in time frame. INDICATOR 2: Proportion of errors in billed treatment setting, that is, outpatient observation billed as inpatient = number of errors in billed treatment setting/total short-term admissions in time frame.Six of the 9 hospitals were able to accomplish reduction of their error rates within 6 months from the beginning of the study. The seventh hospital reached its goals in the 7th month, with the 2 remaining hospitals making progress toward their goals by the conclusion of the study. 1 Case managers must be up-to-date with payor requirements regarding medical record documentation for medical necessity of services and timing of inpatient admission, e.g., for Medicare, the date and time of the written physician's order for admission to the inpatient care setting is the date and time of inpatient admission. 2 The balancing of clinical decisions and financial considerations required of case managers in hospital settings remains an ongoing challenge. 3 Senior leadership must be engaged in ensuring the success of the case management program by providing the resources required. 4 Managers of case

  11. BWR reactor management system

    International Nuclear Information System (INIS)

    Makino, Kakuji; Kawamura, Atsuo; Yoshioka, Ritsuo; Neda, Toshikatsu.

    1979-01-01

    It is necessary to grasp the delicate state of operation in reactor cores in view of the control of burn-up and power output at the time of the operation management of BWRs. Enormous labor has been required for the collection, processing and evaluation of the data. It is desirable to obtain the safer, more efficient and faster method of operation control by predicting the states in cores including the change of xenon and reflecting them to operation plans as well as by tracing with high accuracy the past burn-up history for a long period. At present, the on-line evaluation of the states in cores is carried out with the process computers attached to respective units, but the amount of data required for core operation management of high degree far exceeds their capacity. From such viewpoints, the research and development on the reactor management system were carried out. The data processing concerning core operation management is performed with newly installed computers utilizing the data from existing process computers, and the operation of reactor cores, the qualitative improvement of management works, labor saving, and fast, efficient operation control are feasible with it. This system was installed in an actual plant in October, 1977. The composition of the system, the prediction of the change in local output distribution accompanying control rod operation, the prediction of the change in the states in cores due to the flow rate of coolant, and the function of collecting plant data are explained. (Kako, I.)

  12. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  13. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  14. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  15. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  16. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  17. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  18. Managing Complex Dynamical Systems

    Science.gov (United States)

    Cox, John C.; Webster, Robert L.; Curry, Jeanie A.; Hammond, Kevin L.

    2011-01-01

    Management commonly engages in a variety of research designed to provide insight into the motivation and relationships of individuals, departments, organizations, etc. This paper demonstrates how the application of concepts associated with the analysis of complex systems applied to such data sets can yield enhanced insights for managerial action.

  19. Visual management support system

    Science.gov (United States)

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  20. Advanced Distribution Management System

    OpenAIRE

    Avazov, Artur; Sobinova, Lubov Anatolievna

    2016-01-01

    This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  1. Advanced Distribution Management System

    Science.gov (United States)

    Avazov, Artur R.; Sobinova, Liubov A.

    2016-02-01

    This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  2. Advanced Distribution Management System

    Directory of Open Access Journals (Sweden)

    Avazov Artur R.

    2016-01-01

    Full Text Available This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  3. Smart energy management system

    Science.gov (United States)

    Desai, Aniruddha; Singh, Jugdutt

    2010-04-01

    Peak and average energy usage in domestic and industrial environments is growing rapidly and absence of detailed energy consumption metrics is making systematic reduction of energy usage very difficult. Smart energy management system aims at providing a cost-effective solution for managing soaring energy consumption and its impact on green house gas emissions and climate change. The solution is based on seamless integration of existing wired and wireless communication technologies combined with smart context-aware software which offers a complete solution for automation of energy measurement and device control. The persuasive software presents users with easy-to-assimilate visual cues identifying problem areas and time periods and encourages a behavioural change to conserve energy. The system allows analysis of real-time/statistical consumption data with the ability to drill down into detailed analysis of power consumption, CO2 emissions and cost. The system generates intelligent projections and suggests potential methods (e.g. reducing standby, tuning heating/cooling temperature, etc.) of reducing energy consumption. The user interface is accessible using web enabled devices such as PDAs, PCs, etc. or using SMS, email, and instant messaging. Successful real-world trial of the system has demonstrated the potential to save 20 to 30% energy consumption on an average. Low cost of deployment and the ability to easily manage consumption from various web enabled devices offers gives this system a high penetration and impact capability offering a sustainable solution to act on climate change today.

  4. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  5. TFTR data management system

    International Nuclear Information System (INIS)

    Randerson, L.; Chu, J.; Ludescher, C.; Malsbury, J.; Stark, W.

    1986-01-01

    Developments in the tokamak fusion test reactor (TFTR) data management system supporting data management system supporting data acquisition and off-line physics data reduction are described. Data from monitor points, timing channels, and transient recorder channels and other devices are acquired and stored for use by on-line tasks. Files are transferred off-line automatically. A configuration utility determines data acquired and files transferred. An event system driven by file arrival activates off-line reduction processes. A post-run process transfers files not shipped during runs. Files are archived to tape and are retrievable by digraph and shot number. Automatic skimming based on most recent access, file type, shot numbers, and user-set protection maintains the files required for post-run data reduction

  6. Management Information Systems

    Directory of Open Access Journals (Sweden)

    Furduescu Bogdan-Alexandru

    2017-12-01

    Full Text Available Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting information, in particular, with the use of computers [Longley, D. & Shain, M. (1985, p. 164]. The importance of IT in the economic growth and development is widely known, taking into account the impact that technology can have on the success and survival, or the failure of the economic activity of enterprises/organizations, IT offering various management information systems (MIS, executive and feedback segments, which all have important and beneficial implications in management and control.

  7. Managing Conflict in Temporary Management Systems

    Science.gov (United States)

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  8. Mastering the management system.

    Science.gov (United States)

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  9. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  10. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  11. Data Management System

    Science.gov (United States)

    1997-01-01

    CENTRA 2000 Inc., a wholly owned subsidiary of Auto-trol technology, obtained permission to use software originally developed at Johnson Space Center for the Space Shuttle and early Space Station projects. To support their enormous information-handling needs, a product data management, electronic document management and work-flow system was designed. Initially, just 33 database tables comprised the original software, which was later expanded to about 100 tables. This system, now called CENTRA 2000, is designed for quick implementation and supports the engineering process from preliminary design through release-to-production. CENTRA 2000 can also handle audit histories and provides a means to ensure new information is distributed. The product has 30 production sites worldwide.

  12. Mountain biking injuries requiring trauma center admission: a 10-year regional trauma system experience.

    Science.gov (United States)

    Kim, Peter T W; Jangra, Dalbhir; Ritchie, Alec H; Lower, Mary Ellen; Kasic, Sharon; Brown, D Ross; Baldwin, Greg A; Simons, Richard K

    2006-02-01

    Mountain biking has become an increasingly popular recreational and competitive sport with increasingly recognized risks. The purpose of this study was to review a population based approach to serious injuries requiring trauma center admission related to mountain biking, identify trends and develop directions for related injury prevention programs. Three trauma centers in the Greater Vancouver area exclusively serve a major mountain bike park and the North Shore Mountains biking trails. The Trauma Registries and the patient charts were reviewed for mountain bike injuries from 1992 to 2002. The data were analyzed according to demographics, distribution, and severity of injuries, and need for operative intervention. Findings were reviewed with injury prevention experts and regional and national mountain-biking stakeholders to provide direction to injury prevention programs. A total of 1,037 patients were identified as having bicycling-related injuries. Of these, 399 patients sustained 1,092 injuries while mountain biking. There was a threefold increase in the incidence of mountain biking injuries over a 10-year period. Young males were most commonly affected. Orthopedic injuries were most common (46.5%) followed by head (12.2%), spine (12%), chest (10.3%), facial (10.2%), abdominal (5.4%), genitourinary (2.2%), and neck injuries (1%). High operative rate was observed: 38% of injuries and 66% of patients required surgery. One patient died from his injuries. Injury prevention programs were developed and successfully engaged the target population. Mountain biking is a growing cause of serious injuries. Young males are principally at risk and serious injuries result from intended activity and despite protective equipment. Injury prevention programs were developed to address these concerns.

  13. Environmental management systems

    OpenAIRE

    Misiak, Małgorzata

    2016-01-01

    Considering environmental protection requirements in business operations may, in the long run, determine if a lasting comparative advantage can be achieved. That is why our textbook, rich in case studies, identifies not only the threats a business may pose to the environment but stresses the ways of reducing its negative impact. It discusses, among other things, the concept of corporate social responsibility, environmental management systems, methods and the importance of eco-labelling goods ...

  14. Nonimmigrant Admissions - Annual Report

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  15. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  16. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  17. A standardized crisis management model for self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder: The Brief Admission Skåne randomized controlled trial protocol (BASRCT).

    Science.gov (United States)

    Liljedahl, Sophie I; Helleman, Marjolein; Daukantaité, Daiva; Westrin, Åsa; Westling, Sofie

    2017-06-15

    Brief Admission is a crisis and risk management strategy in which self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder self-admit to hospital at times of increasing risk when other efforts to stay safe are failing. Standardized in the current randomized controlled trial, the intensity of Brief Admission Skåne is implemented in durations of three days, with a maximum frequency of three times a month. Brief Admission is integrated into existing treatment plans in advance of crises to prevent reliance on general psychiatric admissions for risk management, as these may be lengthy, unstructured, and of uncertain therapeutic value. The overall objective of the Brief Admission Skåne randomized controlled trial is to determine if Brief Admission can replace general psychiatric admission for self-harming and suicidal individuals with complex mental illness at times of escalating risk. Other objectives of the study are to evaluate whether Brief Admission increases daily functioning and enhances coping, reduces psychiatric symptoms including frequency and severity of self-harm and suicidal behaviours. A final objective is to determine if Brief Admission is an effective crisis management model for this population. Participants are randomized at an individual level to either Brief Admission Skåne plus Treatment as Usual or Treatment As Usual. Based on a priori power analyses, N = 124 participants will be recruited to the study. Data collection is in progress, and will continue until June 2018. All participant data are single-blinded and will be handled with intention-to-treat analysis. Based on the combined clinical experience of our international research group, the Brief Admission Skåne randomized controlled trial upon which the current protocol is based represents the first initiative to standardize, implement and evaluate Brief Admission amongst self-harming and suicidal individuals, including those with

  18. Impact of a chronic disease management program on hospital admissions and readmissions in an Australian population with heart disease or diabetes.

    Science.gov (United States)

    Hamar, G Brent; Rula, Elizabeth Y; Wells, Aaron; Coberley, Carter; Pope, James E; Larkin, Shaun

    2013-04-01

    Chronic disease management programs (CDMPs) were introduced in Australia to reduce unnecessary health care utilization by the growing population with chronic conditions; however, evidence of effectiveness is needed. This study evaluated the impact of a comprehensive CDMP, My Health Guardian (MHG), on rate of hospital admissions, readmissions, and average length of hospital stay (ALOS) for insured individuals with heart disease or diabetes. Primary outcomes were assessed through retrospective comparison of members in MHG (treatment; n=5053) to similar nonparticipating members (comparison; n=23,077) using a difference-in-differences approach with the year before program commencement serving as baseline and the subsequent 12 or 18 months serving as the program periods. All outcomes were evaluated for the total study population and for disease-matched subgroups (heart disease and diabetes). Statistical tests were performed using multivariate regression controlling for age, sex, number of chronic diseases, and past hospitalization status. After both 12 and 18 months, treatment members displayed decreases in admissions (both, P≤0.001) and readmissions (both, P≤0.01), and ALOS after 18 months (P≤0.01) versus the comparison group; magnitude of impact increased over time for these 3 measures. All outcomes for both disease-matched subgroups directionally mirrored the total study group, but the diabetes subgroup did not achieve significance for readmissions or ALOS. Within the treatment group, admissions decreased with increasing care calls to members (12 and 18 months, Phospital admissions and presents a promising approach to reduce the burden associated with hospitalizations in populations with chronic disease.

  19. Bank Customers Management System

    Directory of Open Access Journals (Sweden)

    Ebubeogu Amarachukwu Felix

    2015-08-01

    Full Text Available ABSTRACT The purpose of this project is in partial fulfilment of the requirements of Bachelor of Science Hon in Information Technology. The Design and development of this Bank customers Management system provides a more secured approach in managing bank customers information which strengthens the relationships between banks and their customers by providing the right solutions that uses a multi-level security to improve customer satisfaction. The technology used in developing this project is ASP.NET and the programming language used to develop this project is C and the IDE used is Microsoft Visual Studio 2013 professional in designing the front end while the back end uses Microsoft SQL Server 2012.

  20. Management Information Systems at CERN

    CERN Document Server

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  1. Mathematics Admission Test Remarks

    Directory of Open Access Journals (Sweden)

    Ideon Erge

    2016-12-01

    Full Text Available Since 2014, there have been admission tests in mathematics for applicants to the Estonian University of Life Sciences for Geodesy, Land Management and Real Estate Planning; Civil Engineering; Hydraulic Engineering and Water Pollution Control; Engineering and Technetronics curricula. According to admission criteria, the test must be taken by students who have not passed the specific mathematics course state exam or when the score was less than 20 points. The admission test may also be taken by those who wish to improve their state exam score. In 2016, there were 126 such applicants of whom 63 took the test. In 2015, the numbers were 129 and 89 and in 2014 150 and 47 accordingly. The test was scored on scale of 100. The arithmetic average of the score was 30.6 points in 2016, 29.03 in 2015 and 18.84 in 2014. The test was considered to be passed with 1 point in 2014 and 20 points in 2015 and 2016. We analyzed test results and gave examples of problems which were solved exceptionally well or not at all.

  2. A COMPARISON OF THE CLASS ACTION FOR DAMAGES IN THE AMERICAN JUDICIAL SYSTEM TO THE BRAZILIAN CLASS ACTION: THE REQUIREMENTS OF ADMISSIBILITY

    Directory of Open Access Journals (Sweden)

    A. P. Grinover

    2015-01-01

    Full Text Available After describing the class action for damages in the American judicial system, with the requisites of ‘prevalence’ and ‘superiority,’ the study passes to the examiner of the requirements of the admissibility of the Brazilian class action for damages, concluding on the existence of the same requisites, even in a civil law system.

  3. Pollution management system

    DEFF Research Database (Denmark)

    2015-01-01

    A pollution management system comprises an array of one or more inlets and at least one outlet. The one or more inlets are arranged to collect polluted air and supply said polluted air to a polluted air treatment element. The one or more inlets each comprise a respective inlet sensor for measuring...... a level of pollution at the inlet, and the at least one outlet comprises an outlet sensor for measuring a level of pollution at the outlet. The inlet sensors and the outlet sensor are arranged to provide feedback to the polluted air treatment element....

  4. Pembangunan Model Restaurant Management System

    OpenAIRE

    Fredy Jingga; Natalia Limantara

    2014-01-01

    Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS) help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they a...

  5. Environmental management system

    International Nuclear Information System (INIS)

    2004-01-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  6. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This contract was for the development of a new range of colliery information computer systems (CIS) using a VAX 11/730 computer. The report details the selection of the system and the set-up of the hardware and software. The first application of these systems was to monitor production and delays from longwall faces. A trial installation was implemented at Shirebrook Colliery and this proved so successful that British Coal are now installing many similar systems. The key features of the production monitoring application are that delays are automatically detected in real time and the operator is prompted for the root cause of the delay. This is done through a linked series of questions and answere from a linked set of possible delay causes. Ad hoc and regular reports are produced giving local colliery management visibility of coal face performance, thus enabling informed decisions and corrective action to be taken. Following the successful application to production monitoring, the system was extended to heading/drivages, coal clearance/conveyors, mine air environment and fixed plant. Those applications were operational during the contract but have since been extended.

  7. TFTR data management system

    International Nuclear Information System (INIS)

    Randerson, L.; Chu, J.; Ludescher, C.; Malsbury, J.; Stark, W.

    1986-01-01

    Developments in the tokamak fusion test reactor (TFTR) data-management system supporting data acquisition and off-line physics data reduction are described. Data from monitor points, timing channels, transient recorder channels, and other devices are acquired and stored for use by on-line tasks. Files are transferred off line automatically. A configuration utility determines data acquired and files transferred. An event system driven by file arrival activates off-line reduction processes. A post-run process transfers files not shipped during runs. Files are archived to tape and are retrievable by digraph and shot number. Automatic skimming based on most recent access, file type, shot numbers, and user-set protections maintains the files required for post-run data reduction

  8. EUPHIDS, a decision-support system for the admission of pesticides

    NARCIS (Netherlands)

    Beinat E; Berg R van den; Vrije Universiteit van; Fraunhofer Institue for Environmental Chemistry; International Centre of Pesticide Safety, Busto; LBG

    1996-01-01

    EUPHIDS (EUropean Pesticide Hazard Information and Decision-support System) is the result of a research project carried out during 1993-1995 with the support of the Environment Research Programme (1990-1994) of the European Union. The system is meant to become an aid in the process of registering a

  9. Admissibility and hyperbolicity

    CERN Document Server

    Barreira, Luís; Valls, Claudia

    2018-01-01

    This book gives a comprehensive overview of the relationship between admissibility and hyperbolicity. Essential theories and selected developments are discussed with highlights to applications. The dedicated readership includes researchers and graduate students specializing in differential equations and dynamical systems (with emphasis on hyperbolicity) who wish to have a broad view of the topic and working knowledge of its techniques. The book may also be used as a basis for appropriate graduate courses on hyperbolicity; the pointers and references given to further research will be particularly useful. The material is divided into three parts: the core of the theory, recent developments, and applications. The first part pragmatically covers the relation between admissibility and hyperbolicity, starting with the simpler case of exponential contractions. It also considers exponential dichotomies, both for discrete and continuous time, and establishes corresponding results building on the arguments for exponent...

  10. The Pattern of Surgical Admissions in University of Nigeria Teaching ...

    African Journals Online (AJOL)

    The digestive system and genitourinary systems were the most commonly affected systems. Emergency admission accounted for 18.1% of all surgical admissions while elective admissions accounted for the rest. Conclusion: More detailed research on the pattern of admissions is important in planning and should be carried ...

  11. Initial time singularities and admissible initial states for a system of coupled scalar fields

    Energy Technology Data Exchange (ETDEWEB)

    Baacke, Juergen [Technische Univ. Dortmund (Germany). Fakultaet Physik; Kevlishvili, Nina [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany); GAS, Tbilisi (Georgia). Andronikashvili Inst. of Physics

    2009-10-15

    We discuss the problem of initial states for a system of coupled scalar fields out of equilibrium in the one-loop approximation. The fields consist of classical background fields, taken constant in space, and quantum fluctuations. If the initial state is the adiabatic vacuum, i.e., the ground state of a Fock space of particle excitations that diagonalize the mass matrix, the energy-momentum tensor is infinite at t=0, its most singular part behaves as 1/t. When the system is coupled to gravity this presents a problem that we solve by a Bogoliubov transformation of the naive initial state. As a side result we also discuss the canonical formalism and the adiabatic particle number for such a system. Most of the formalism is presented for Minkowksi space. Embedding the system and its dynamics into a flat FRW universe is straightforward and we briefly address the essential modifications. (orig.)

  12. Initial time singularities and admissible initial states for a system of coupled scalar fields

    International Nuclear Information System (INIS)

    Baacke, Juergen; Kevlishvili, Nina; GAS, Tbilisi

    2009-10-01

    We discuss the problem of initial states for a system of coupled scalar fields out of equilibrium in the one-loop approximation. The fields consist of classical background fields, taken constant in space, and quantum fluctuations. If the initial state is the adiabatic vacuum, i.e., the ground state of a Fock space of particle excitations that diagonalize the mass matrix, the energy-momentum tensor is infinite at t=0, its most singular part behaves as 1/t. When the system is coupled to gravity this presents a problem that we solve by a Bogoliubov transformation of the naive initial state. As a side result we also discuss the canonical formalism and the adiabatic particle number for such a system. Most of the formalism is presented for Minkowksi space. Embedding the system and its dynamics into a flat FRW universe is straightforward and we briefly address the essential modifications. (orig.)

  13. What impact did a Paediatric Early Warning system have on emergency admissions to the paediatric intensive care unit? An observational cohort study.

    Science.gov (United States)

    Sefton, G; McGrath, C; Tume, L; Lane, S; Lisboa, P J G; Carrol, E D

    2015-04-01

    The ideology underpinning Paediatric Early Warning systems (PEWs) is that earlier recognition of deteriorating in-patients would improve clinical outcomes. To explore how the introduction of PEWs at a tertiary children's hospital affects emergency admissions to the Paediatric Intensive Care Unit (PICU) and the impact on service delivery. To compare 'in-house' emergency admissions to PICU with 'external' admissions transferred from District General Hospitals (without PEWs). A before-and-after observational study August 2005-July 2006 (pre), August 2006-July 2007 (post) implementation of PEWs at the tertiary children's hospital. The median Paediatric Index of Mortality (PIM2) reduced; 0.44 vs 0.60 (pemergency admissions to PICU. A 39% reduction in emergency admission total beds days reduced cancellation of major elective surgical cases and refusal of external PICU referrals. Following introduction of PEWs at a tertiary children's hospital PIM2 was reduced, patients required less PICU interventions and had a shorter length of stay. PICU service delivery improved. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. Admission of new oncological drugs to the Slovenian health care system and their accessibility to the patients

    Directory of Open Access Journals (Sweden)

    Mitja Kos

    2007-09-01

    Full Text Available Background: The aim of the present study is to analyze the admission of anticancer drugs to the Slovenian healthcare system, and to evaluate patients’ accessibility to these medications.Methods: Admission and accessibility to anticancer drugs was evaluated by analysing: differences in registration time among USA, selected member states of EU, and Slovenia; time from the registration to the first use in Slovenia; differences between the first use in Slovenia and the first use in selected member states of EU and by analysing the market of oncology drugs. The study included drugs of the ATC groups such as Antitumor medications (cytostatics (ATC = L01 and Endocrine treatment (ATC = L02 that were used in Slovenia for the first time between 1999 to 2005. Registration data for Slovenia and EU was obtained from the registration documention of selected drugs at the Agency for Medicinal Products and Medical Devices of the Republic of Slovenia, and the European Agency for the Evaluation of Medicinal Products (EMEA. Registration data for USA was obtained from the registration documention of selected drugs at the Food and Drug Administration (FDA. The information upon the first use of drugs in Slovenia was acquired from the PharMIS system, and the information upon the first use of drugs in selected member states of EU was obtained from the study on patients’ access to oncology drugs by Nils Wilking and Bengt Jönsson, performed from 2005. Data for the market analysis of oncology drugs was obtained from the PharMIS system.Results: In previous years a delay in registration time between Slovenia and compared states was present for some oncology drugs. Along with the acceptance of Slovenia as a new member state of EU, on 1st May 2004, registration process in Slovenia became a part of the registration system of the European Agency for the Evaluation of Medicinal Products (EMEA. Majority of drugs had a time difference between the registration and the first use

  15. System Security Management in SNMP

    OpenAIRE

    P. Deivendran; Dr. R. Dhanapal Ph.D

    2010-01-01

    We present a framework for managing system security, based on a SNMP Management Information Base (MIB), namely the System Security MIB (SSEC MIB), We have defined managed objects and completed the ASN.1 description of the MIB that embeds them. The related security management functions are mainly focused on monitoring external script execution for system security scanning and access control. The main goal of this work is to introduce the semantics and a standard interface that will allow the r...

  16. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  17. Analysing admission rules to a service system with two job classes and mandatory pre-emption

    DEFF Research Database (Denmark)

    Larsen, Christian

    , the pre-emptive action will cause a time delay before the server can start the service. Therefoe, the administrator might in some instances deny a class 2 job access to an idle server and instead hold it back in queue. We develop a semi-Markov decision model for this problem. In order to compute......We consider a queueing system consisting of S identical servers and two job classes, where class 1 jobs must always be processed as soon as possible. Therefore, the administrator of the system must, if neccesary, pre-empt a class 2 job and allocate the server to an arriving class 1 job. However...

  18. Look-ahead policies for admission to a single server loss system

    NARCIS (Netherlands)

    Nawijn, W.M.

    1990-01-01

    Consider a single server loss system in which the server, being idle, may reject or accept an arriving customer for service depending on the state at the arrival epoch. It is assumed that at every arrival epoch the server knows the service time of the arriving customer, the arrival time of the next

  19. Dynamic allocation and admission policies for QoS-aware provisioning systems

    DEFF Research Database (Denmark)

    Mazzucco, M.; Mazzara, M.; Dragoni, Nicola

    2013-01-01

    We present an architecture of a hosting system consisting of a set of hosted web services subject to QoS constraints, and a certain number of servers used to run user's demand. The traffic is session–based, while provider and users agree on SLAs specifying the expected level of service performance...

  20. The predictive validity of grade point average scores in a partial lottery medical school admission system

    NARCIS (Netherlands)

    Cohen-Schotanus, Janke; Muijtjens, Arno M. M.; Reinders, Jan J.; Agsteribbe, Jessica; van Rossum, Herman J. M.; van der Vleuten, Cees P. M.

    2006-01-01

    PURPOSE To ascertain whether the grade point average (GPA) of school-leaving examinations is related to study success, career development and scientific performance. The problem of restriction of range was expected to be partially reduced due to the use of a national lottery system weighted in

  1. Cryptographic Key Management System

    Energy Technology Data Exchange (ETDEWEB)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  2. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  3. Alarm management system

    International Nuclear Information System (INIS)

    Woods, D.D.; Elm, W.C.; Lipner, M.H.; Butterworth, G.E.; Easter, J.R.

    1989-01-01

    An alarm management system is described, comprising: a light water pressurized nuclear power plant; sensors coupled to the plant indicating the state of the plant; a sensor signal processor, operatively connected to the sensors, for producing state signals indicating the state of the sensors monitoring the power plant from the sensor signals and for combining the state signals using rule based algorithms to produce abnormality indication signals; a message processor, operatively connected to the sensor signal processor for receiving the abnormality indication signals; a spatially dedicated parallel display for each function, operatively connected to the message processor, for displaying the portion of the messages simultaneously; and a serial display, operatively connected to the message processor, for displaying the message in the queues in priority order within category within function upon request, the message processor outputting messages from the queue to the parallel display as display space becomes available on the parallel display due to an abnormality being resolved

  4. Managing Distributed Knowledge Systems

    DEFF Research Database (Denmark)

    Sørensen, Brian Vejrum; Gelbuda, Modestas

    2005-01-01

    . This paper contributes to the research on organizations as distributed knowledge systems by addressing two weaknesses of the social practice literature. Firstly, it downplays the importance of formal structure and organizational design and intervention efforts by key organizational members. Secondly, it does......The article argues that the growth of de novo knowledge-based organization depends on managing and coordinating increasingly growing and, therefore, distributed knowledge. Moreover, the growth in knowledge is often accompanied by an increasing organizational complexity, which is a result...... of integrating new people, building new units and adding activities to the existing organization. It is argued that knowledge is not a stable capacity that belongs to any actor alone, but that it is rather an ongoing social accomplishment, which is created and recreated as actors engage in mutual activities...

  5. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  6. Systems management of facilities agreements

    International Nuclear Information System (INIS)

    Blundell, A.

    1998-01-01

    The various types of facilities agreements, the historical obstacles to implementation of agreement management systems and the new opportunities emerging as industry is beginning to make an effort to overcome these obstacles, are reviewed. Barriers to computerized agreement management systems (lack of consistency, lack of standards, scarcity of appropriate computer software) are discussed. Characteristic features of a model facilities agreement management system and the forces driving the changing attitudes towards such systems (e.g. mergers) are also described

  7. Manpower management information system /MIS/

    Science.gov (United States)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  8. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  9. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  10. Informational system. Documents management

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2009-12-01

    Full Text Available Productivity growing, as well as reducing of operational costs in a company can be achieved by adopting a document management solutions. Such application will allow management and structured and efficient transmission of information within the organization.

  11. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  12. The predictive validity of grade point average scores in a partial lottery medical school admission system.

    Science.gov (United States)

    Cohen-Schotanus, Janke; Muijtjens, Arno M M; Reinders, Jan J; Agsteribbe, Jessica; van Rossum, Herman J M; van der Vleuten, Cees P M

    2006-10-01

    To ascertain whether the grade point average (GPA) of school-leaving examinations is related to study success, career development and scientific performance. The problem of restriction of range was expected to be partially reduced due to the use of a national lottery system weighted in favour of students with higher GPAs. We studied the students (n = 398) admitted to the Faculty of Medicine, University of Groningen, the Netherlands in 1982 and 1983. Data concerning drop-out and study progress were derived from the student administration. Data about career development were obtained from annual interviews with graduates (n = 318) between 1993 and 2000. Literature searches yielded data concerning scientific performance. Multiple linear regression and logistic regression were used to analyse the data. The variables 'gender' and 'cohort' and their interaction were included in the analyses to account for variation in the general level of the dependent variable and the effect of GPA on the dependent variable. GPA scores had no effect on drop-out rate. High GPA scores were associated with significantly less time to graduation, more chance of a preferred placement for specialist training and higher scientific output. GPA was not related to income. Gender differences were found for study duration and scientific output. Women graduated earlier and published less. The GPA of school-leaving examinations was found to be related to study success, career development and scientific performance. In this study the usual problem of restriction of range was shown to be absent. The weighted lottery procedure even resulted in an over-dispersion of candidates relative to the applicants. The resulting effect sizes were in agreement with those reported in other studies.

  13. CEFR information management system solution

    International Nuclear Information System (INIS)

    Lu Fei; Zhao Jia'ning

    2011-01-01

    Based on finished information resources planning scheme for China sodium cooled experimental fast breeder reactor and the advanced information resources management solution concepts were applied, we got the building solution of CEFR information management systems. At the same time, the technical solutions of systems structures, logic structures, physical structures, development platforms and operation platforms for information resources management system in fast breeder reactors were developed, which provided programmatic introductions for development works in future. (authors)

  14. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available bnaude@csir.co.za Charl Petzer Council for Scientific and Industrial Research PO Box 395 Pretoria 0001 South Africa +2712 841 4292 CPetzer1@csir.co.za Copyright © 2017 by B Naudé, C Petzer. Published and used by INCOSE with permission.... Charl Petzer is registered professional engineer with 30 years of programme/project management as well as systems engineering experience in military and other environments. He has been the lead systems engineer, as well as programme manager on several...

  15. Army Healthcare Enterprise Management System

    National Research Council Canada - National Science Library

    2001-01-01

    .... The complaint alleged that the Army Healthcare Enterprise Management System was not properly competed, potential conflicts of interest existed, and possible contract performance problems existed...

  16. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  17. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  18. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  19. Pengembangan Content Management System pada Admisi Online Binus University

    Directory of Open Access Journals (Sweden)

    Karto Iskandar

    2012-12-01

    Full Text Available Technically registration form for new Binus institution must be regenerated and not dynamic. Therefore, this research is objected to simplify the creation of registration process for new Binus institution and provide solutions to the problem when Binus establish other new institutions. Methodology used is analysis and design of the database (database oriented. Analysis is done by asking the problems of existing systems in the IT Directorate, whereas the design uses UML diagram notation 2.0. The results obtained is front end and back end applications for the Content Management System of the registration form. The results of this design can be used to simplify the new student registration or in the many Binus institutions by grouping similar fields. With some changes in the front end and back end applications for content Management System, the addition of new online admission application form can be managed faster, where the creation of admision registration form is managed in the back end application. As suggestions for future development, online admission registration can be run in mobile version.

  20. Hospital managers need management information systems.

    Science.gov (United States)

    Davis, S; Freeman, J R

    1976-01-01

    A new hospital director seeking to bring his institution to the brink of solvency found himself with ten pounds of data but no "information"--at least, not the kind of information he could use as a basis for management decisions. What he needed was a system that would not only present data, but the meaning of the data. Such a system is the integrated MIS.

  1. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  2. Cargo Data Management Demonstration System

    Science.gov (United States)

    1974-02-01

    Delays in receipt and creation of cargo documents are a problem in international trade. The work described demonstrates some of the advantages and capabilities of a computer-based cargo data management system. A demonstration system for data manageme...

  3. System analysis for radwaste management

    International Nuclear Information System (INIS)

    Lennemann, W.L.

    1987-01-01

    The most logical approach to evaluating radioactive waste management processes and their options is to consider radioactive waste management, handling, and disposal as a complete and complex system from the waste arisings to their disposition. The principal elements that should be considered or taken into account when making a decision involving one or more components of a radwaste management system essentially concern radiation doses or detriments- both radiological and industrial safety and both capital investments and operating costs. This paper discusses the system analysis of the low- and medium-level radioactive waste management

  4. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  5. IT Asset Management System -

    Data.gov (United States)

    Department of Transportation — ITAMS provides a web frontend for the managing of all HW Assets lifecycle data purchased by ATO since 2006. In addition it contains much of our Enterprise SW license...

  6. Password Management Systems

    OpenAIRE

    Fiala, Lukáš

    2010-01-01

    The goal is to describe and compare password management utilities and applications for individuals or small teams. Examples of such applications are KeePass, Password Safe, CodeWallet Pro and eWallet. On-line password managers like LastPass or RoboForm are another group of applications. Support for synchronization, sharing passwords in a team or protection against keyloggers (when filling in automatically) may also be included in the criteria.

  7. Management of fever, hyperglycemia, and swallowing dysfunction following hospital admission for acute stroke in New South Wales, Australia.

    Science.gov (United States)

    Drury, Peta; Levi, Christopher; McInnes, Elizabeth; Hardy, Jennifer; Ward, Jeanette; Grimshaw, Jeremy M; D' Este, Catherine; Dale, Simeon; McElduff, Patrick; Cheung, N Wah; Quinn, Clare; Griffiths, Rhonda; Evans, Malcolm; Cadilhac, Dominique; Middleton, Sandy

    2014-01-01

    Fever, hyperglycemia, and swallow dysfunction poststroke are associated with significantly worse outcomes. We report treatment and monitoring practices for these three items from a cohort of acute stroke patients prior to randomization in the Quality in Acute Stroke Care trial. Retrospective medical record audits were undertaken for prospective patients from 19 stroke units. For the first three-days following stroke, we recorded all temperature readings and administration of paracetamol for fever (≥37·5°C) and all glucose readings and administration of insulin for hyperglycemia (>11 mmol/L). We also recorded swallow screening and assessment during the first 24 h of admission. Data for 718 (98%) patients were available; 138 (19%) had four hourly or more temperature readings and 204 patients (29%) had a fever, with 44 (22%) receiving paracetamol. A quarter of patients (n = 102/412, 25%) had six hourly or more glucose readings and 23% (95/412) had hyperglycemia, with 31% (29/95) of these treated with insulin. The majority of patients received a swallow assessment (n = 562, 78%) by a speech pathologist in the first instance rather than a swallow screen by a nonspeech pathologist (n = 156, 22%). Of those who passed a screen (n = 108 of 156, 69%), 68% (n = 73) were reassessed by a speech pathologist and 97% (n = 71) were reconfirmed to be able to swallow safely. Our results showed that acute stroke patients were: undermonitored and undertreated for fever and hyperglycemia; and underscreened for swallowing dysfunction and unnecessarily reassessed by a speech pathologist, indicating the need for urgent behavior change. © 2013 The Authors. International Journal of Stroke © 2013 World Stroke Organization.

  8. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  9. The contribution of Ebola viral load at admission and other patient characteristics to mortality in a Médecins Sans Frontières (MSF) Ebola Case Management Centre (CMC), Kailahun, Sierra Leone, June -October, 2014.

    LENUS (Irish Health Repository)

    Fitzpatrick, Gabriel

    2015-05-22

    This paper describes patient characteristics, including Ebola viral load, associated with mortality in an MSF Ebola case management centre. Out of 780 admissions between June and October 2014, 525 (67%) were positive for Ebola with a known outcome. The crude mortality rate was 51% (270\\/525). Ebola viral load (whole blood sample) data was available on 76% (397\\/525) of patients. Univariate analysis indicated viral load at admission, age, symptom duration prior to admission and distance travelled to the CMC were associated with mortality (p value<0.05). The multivariable model predicted mortality in those with a viral load at admission greater than 10 million copies per millilitre (p value<0.05, Odds Ratio>10), aged 50 years or more (p value=0.08, Odds Ratio=2) and symptom duration prior to admission less than 5 days (p value=0.14). The presence of confusion, diarrhoea and conjunctivitis were significantly higher (p value<0.05) in Ebola patients who died. These findings highlight the importance viral load at admission has on mortality outcomes and could be used to cohort cases with viral loads greater than 10 million copies into dedicated wards with more intensive medical support to further reduce mortality.

  10. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  11. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  12. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  13. Is "Race-Neutral" Really Race-Neutral?: Disparate Impact towards Underrepresented Minorities in Post-209 UC System Admissions

    Science.gov (United States)

    Santos, Jose L.; Cabrera, Nolan L.; Fosnacht, Kevin J.

    2010-01-01

    Authors examine the proportion of undergraduate applications, admissions, and enrollments preceding, during, and after Proposition 209 while accounting for the relative growth in University of California eligibility for underrepresented minorities (URMs). They employed standard deviation analyses to measure dispersion of the URMs to non-URMs.…

  14. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  15. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  16. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  17. Biometric System Vulnerability as a Compromising Factor for Integrity of Chain of Custody and Admissibility ofDigitalEvidence in Court of Justice: Analysis and Improvement Proposal

    Directory of Open Access Journals (Sweden)

    Zoran Cosic

    2014-06-01

    Full Text Available Biometric systems play an important role in digital investigation process as a important factor of authentication and verification applications, since they are strongly linked to the holder of a biometric  traits  and  possible  suspect.  Thus  it  is  important  that  biometric  systems  can  be designed  to  withstand  attacks  when  employed  in  security-critical  applications,  especially  in unattended  remote  applications  such  as  energy  plants,  access  to  borders  at  airports,  ecommerce  etc.  Biometric  recognition  either  raises  important  legal  issues  of  remediation, authority,  and  reliability,  and,  of  course,  privacy.  The  standard  assumptions  of  the technologists  who  design  new  techniques,  capabilities,  and  systems  are  very  different  from those embedded in the legal  system.  Legal precedent on the  use of biometric technology is growing, with some key cases going back decades and other more recent cases having raised serious questions about the admissibility of biometric evidence in court. In this paper authors is about to explain influence of reliability of biometric system on general acceptance of digital evidence  in  Court  of  Justice  process.  Through  paper  authors  are  also  about  to  propose vulnerability assessment of biometric system as improvementfactor of reliability of existing methodology  for  preserving  chain  of  custody  of  digital  evidence  called  DEMF  (Digital Evidence Management Framework. Improvement proposal is presented as an introduction of phase  of  biometric  vulnerability  evaluation  methodology  within  proposedframework called APDEMF (Admissibility procedure of DEMF. Using UML (Universal Modeling Language modeling  methodology  authors  are  about  to  represent  a  APDEMF  framework  which  will describe essential phases of the same process.

  18. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D. M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  19. Evaluating a Skills Management System

    International Nuclear Information System (INIS)

    Largier, A.

    2013-01-01

    In order to anticipate the large number of people due to retire in the next few years, and to optimize the workforce contribution, IRSN (Institute for radiation protection and nuclear safety) is setting up skill management. This poster presents the IRSN's skill management system. The skill management system is based on a 4 step approach: -) identifying and listing the necessary skills, -) assessing the skills available, -) defining and setting up solutions: training, recruitment, out-sourcing), and -) feedback about the efficiency of the system. It appears that it is important to take into account the way the organization considers individual ability in order to favour collective proficiency

  20. HTR-10 management information system

    International Nuclear Information System (INIS)

    Liu Ruoxiao; Wu Zhongwang; Xi Shuren

    2000-01-01

    The HTR-10 Management information system (REMIS) strengthens the managerial level and usage of the information of HTR-10, thereby enhances the ability and efficiency of the design and management work. REMIS is designed based on the Client/Server framework. Database management system is SQL Server 6.5 for NT, While the client side is developed by Borland C ++ Builder, and it is based on Windows 95/98. The network protocol is TCP/IP. REMIS collects date of the HTR-10 at four parameters: Reactor properties, Design parameters, Equipment properties Reactor system flow charts. Final discussing extended prospect of REMIS

  1. The CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Cinquilli, M. [CERN; Evans, D. [Fermilab; Foulkes, S. [Fermilab; Hufnagel, D. [Fermilab; Mascheroni, M. [CERN; Norman, M. [UC, San Diego; Maxa, Z. [Caltech; Melo, A. [Vanderbilt U.; Metson, S. [Bristol U.; Riahi, H. [INFN, Perugia; Ryu, S. [Fermilab; Spiga, D. [CERN; Vaandering, E. [Fermilab; Wakefield, Stuart [Imperial Coll., London; Wilkinson, R. [Caltech

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager), a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  2. The CMS workload management system

    International Nuclear Information System (INIS)

    Cinquilli, M; Mascheroni, M; Spiga, D; Evans, D; Foulkes, S; Hufnagel, D; Ryu, S; Vaandering, E; Norman, M; Maxa, Z; Wilkinson, R; Melo, A; Metson, S; Riahi, H; Wakefield, S

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager); a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  3. Customer relationship management system

    OpenAIRE

    Selenis, Laimonas

    2004-01-01

    Customer Relationship Management (CRM) is one of the biggest problems for many companies today. By analyzing history records (profiles) of its customers, organization can effectively adapt its business activity to users needs and create better products and services. Proper analysis of customer profiles can help to predict the behaviour of the customers. After grouping customer profiles by similar attributes, company can easier handle its interactions with similar users. Such group profiling c...

  4. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  5. Inappropriate Intensive Care Unit admissions: Nigerian doctors ...

    African Journals Online (AJOL)

    2015-12-04

    Dec 4, 2015 ... Background: Nonclinical factors are said to influence decisions to admit patients into the ... admissions per year did not affect possible steps in the setting of a full ICU. ... hospital management, patient's family, threat of legal.

  6. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  7. Information Security Management System toolkit

    OpenAIRE

    Καραμανλής, Μάνος; Karamanlis, Manos

    2016-01-01

    Secure management of information is becoming critical for any organization because information is one of the most valuable assets in organization’s business operations. An Information security management system (ISMS) consists of the policies, procedures, guidelines, and associated resources and activities, collectively managed by an organization, in the pursuit of protecting its information assets. An ISMS is a systematic approach for establishing, implementing, operating, mon...

  8. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  9. Management system of instrument database

    International Nuclear Information System (INIS)

    Zhang Xin

    1997-01-01

    The author introduces a management system of instrument database. This system has been developed using with Foxpro on network. The system has some characters such as clear structure, easy operation, flexible and convenient query, as well as the data safety and reliability

  10. A standardized crisis management model for self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder: The Brief Admission Skane randomized controlled trial protocol (BASRCT)

    NARCIS (Netherlands)

    Liljedahl, S.I.; Helleman, M.; Daukantaite, D.; Westrin, A.; Westling, S.

    2017-01-01

    BACKGROUND: Brief Admission is a crisis and risk management strategy in which self-harming and suicidal individuals with three or more diagnostic criteria of borderline personality disorder self-admit to hospital at times of increasing risk when other efforts to stay safe are failing. Standardized

  11. Nuclear database management systems

    International Nuclear Information System (INIS)

    Stone, C.; Sutton, R.

    1996-01-01

    The authors are developing software tools for accessing and visualizing nuclear data. MacNuclide was the first software application produced by their group. This application incorporates novel database management and visualization tools into an intuitive interface. The nuclide chart is used to access properties and to display results of searches. Selecting a nuclide in the chart displays a level scheme with tables of basic, radioactive decay, and other properties. All level schemes are interactive, allowing the user to modify the display, move between nuclides, and display entire daughter decay chains

  12. Army Healthcare Enterprise Management System

    National Research Council Canada - National Science Library

    2001-01-01

    ... to buy the Enterprise Management System. The Information Technology Business Center provides information technology services to Fort Sam Houston tenants which include the Army Medical Command and the Army Medical Department Center and School...

  13. Fault management and systems knowledge

    Science.gov (United States)

    2016-12-01

    Pilots are asked to manage faults during flight operations. This leads to the training question of the type and depth of system knowledge required to respond to these faults. Based on discussions with multiple airline operators, there is agreement th...

  14. Congestion Management System Process Report

    Science.gov (United States)

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  15. Introducing Managers to Expert Systems.

    Science.gov (United States)

    Finlay, Paul N.; And Others

    1991-01-01

    Describes a short course to expose managers to expert systems, consisting of (1) introductory lecture; (2) supervised computer tutorial; (3) lecture and discussion about knowledge structuring and modeling; and (4) small group work on a case study using computers. (SK)

  16. Pembangunan Model Restaurant Management System

    Directory of Open Access Journals (Sweden)

    Fredy Jingga

    2014-12-01

    Full Text Available Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they accept the customer order until the chef could know what to cook and checklist for the waitress wheter the order is fullfill or not, until the cahsier that will calculate the bill and the payment that they accep from the customer.

  17. System Wide Information Management (SWIM)

    Science.gov (United States)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  18. Peadiatric social admission

    OpenAIRE

    Carter Anand, Janet

    2009-01-01

    The phenomenon of paediatric social admission describes the hospitalisation of children for medicallynon- urgent and/or social reasons. Much of the research in this field has been in relation to avoidable admissions which have been identified, studied and condoned based on strict medical criteria. Such research has tended to mask the significance of social factors and the commonplace practice of Paediatric Social Admission. This paper examines decision making from the perspective of the healt...

  19. Electronic Resource Management Systems

    Directory of Open Access Journals (Sweden)

    Mark Ellingsen

    2004-10-01

    Full Text Available Computer applications which deal with electronic resource management (ERM are quite a recent development. They have grown out of the need to manage the burgeoning number of electronic resources particularly electronic journals. Typically, in the early years of e-journal acquisition, library staff provided an easy means of accessing these journals by providing an alphabetical list on a web page. Some went as far as categorising the e-journals by subject and then grouping the journals either on a single web page or by using multiple pages. It didn't take long before it was recognised that it would be more efficient to dynamically generate the pages from a database rather than to continually edit the pages manually. Of course, once the descriptive metadata for an electronic journal was held within a database the next logical step was to provide administrative forms whereby that metadata could be manipulated. This in turn led to demands for incorporating more information and more functionality into the developing application.

  20. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  1. CLASSIFICATION OF LEARNING MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Yu. B. Popova

    2016-01-01

    Full Text Available Using of information technologies and, in particular, learning management systems, increases opportunities of teachers and students in reaching their goals in education. Such systems provide learning content, help organize and monitor training, collect progress statistics and take into account the individual characteristics of each user. Currently, there is a huge inventory of both paid and free systems are physically located both on college servers and in the cloud, offering different features sets of different licensing scheme and the cost. This creates the problem of choosing the best system. This problem is partly due to the lack of comprehensive classification of such systems. Analysis of more than 30 of the most common now automated learning management systems has shown that a classification of such systems should be carried out according to certain criteria, under which the same type of system can be considered. As classification features offered by the author are: cost, functionality, modularity, keeping the customer’s requirements, the integration of content, the physical location of a system, adaptability training. Considering the learning management system within these classifications and taking into account the current trends of their development, it is possible to identify the main requirements to them: functionality, reliability, ease of use, low cost, support for SCORM standard or Tin Can API, modularity and adaptability. According to the requirements at the Software Department of FITR BNTU under the guidance of the author since 2009 take place the development, the use and continuous improvement of their own learning management system.

  2. Automated Maintenance Management System -

    Data.gov (United States)

    Department of Transportation — To achieve the to-be state of a modernized supply chain infrastructure and the NextGen Mission Service Requirements, the System Information Modernization initiative...

  3. Impact Management System

    Data.gov (United States)

    US Agency for International Development — IMS (developed w/Iraq mission) is a system for conducting quality portfolio impact analysis, linking projects to strategy through integration of context data. IMS...

  4. Management Information Systems

    OpenAIRE

    Furduescu Bogdan-Alexandru

    2017-01-01

    Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting) information, in particular, with the use of computers [Long...

  5. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  6. Device configuration-management system

    International Nuclear Information System (INIS)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information

  7. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  8. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  9. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  10. Management information systems. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, D.; Spence, A.C.

    1985-02-01

    The successful application in the United Kingdom of the real time monitoring and control systems (MINOS) for underground mining operations, particularly in coal transport and the development of coalface monitoring (FIDO) in 1980 led naturally to the design of an operational data base for management. A User Group of experienced colliery managers produced a Management Information System (MIS) requirements specification and began the evolution of the systems of today. Twenty-four mines operate MIS in different ways from total dependency to a means of checking their manual reporting system. MIS collects useful data from all the major MINOS applications and provides a means of manually inputting other, relevant information. A wide variety of displays and reports are available to management, adjusted to meet individual requirements. The benefits from the use of MIS are difficult to quantify, since they become part of the management process. Further developments are taking place based on operational experience and requirements and taking advantage of the recent advances in computer technology. MIS is the modern management tool in British coal mining, collecting, storing, analysing and presenting accurate information upon which management decision making is based.

  11. Systems Engineering Management Procedures

    Science.gov (United States)

    1966-03-10

    hls -iii-rit. -miiiirme 4 --tandnirdized hle iil*ri oa;iu ’ -enperfrm)a- -yýfefi ~lall uitm l--im eniai~ atar n which will lumPremiiieuiea -. v-imli m...with standard component/part selection. and de- tile total system requirements stated in the Sys- tailed functional and physical interfaces: eval- tern...system survivability requirAent. As physical , interface, time, environment, use of these facility requirements are bei developed, standard perts; and

  12. Disposal Site Information Management System

    International Nuclear Information System (INIS)

    Larson, R.A.; Jouse, C.A.; Esparza, V.

    1986-01-01

    An information management system for low-level waste shipped for disposal has been developed for the Nuclear Regulatory Commission (NRC). The Disposal Site Information Management System (DSIMS) was developed to provide a user friendly computerized system, accessible through NRC on a nationwide network, for persons needing information to facilitate management decisions. This system has been developed on NOMAD VP/CSS, and the data obtained from the operators of commercial disposal sites are transferred to DSIMS semiannually. Capabilities are provided in DSIMS to allow the user to select and sort data for use in analysis and reporting low-level waste. The system also provides means for describing sources and quantities of low-level waste exceeding the limits of NRC 10 CFR Part 61 Class C. Information contained in DSIMS is intended to aid in future waste projections and economic analysis for new disposal sites

  13. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  14. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  15. Management systems for service providers

    International Nuclear Information System (INIS)

    Bolokonya, Herbert Chiwalo

    2015-02-01

    In the field of radiation safety and protection there are a number of institutions that are involved in achieving different goals and strategies. These strategies and objectives are achieved based on a number of tools and systems, one of these tools and systems is the use of a management system. This study aimed at reviewing the management system concept for Technical Service Providers in the field of radiation safety and protection. The main focus was on personal monitoring services provided by personal dosimetry laboratories. A number of key issues were found to be prominent to make the management system efficient. These are laboratory accreditation, approval; having a customer driven operating criteria; and controlling of records and good reporting. (au)

  16. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  17. The JCMT Telescope Management System

    Science.gov (United States)

    Tilanus, Remo P. J.; Jenness, Tim; Economou, Frossie; Cockayne, Steve

    Established telescopes often face a challenge when trying to incorporate new software standards and utilities into their existing real-time control system. At the JCMT we have successfully added important new features such as a Relational Database (the Telescope Management System---TMS), an online data Archive, and WWW based utilities to an, in part, 10-year old system. The new functionality was added with remarkably few alterations to the existing system. We are still actively expanding and exploring these new capabilities.

  18. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  19. Decline in adolescent treatment admissions for methamphetamine ...

    African Journals Online (AJOL)

    Background and objectives. The purpose of this report is to describe the changing trends in adolescent treatment admissions for methamphetamine in Cape Town, and to discuss possible implications. Method. Data were collected on admissions for drug abuse treatment through a regular monitoring system involving drug ...

  20. Lexical Profiles of Thailand University Admission Tests

    Science.gov (United States)

    Cherngchawano, Wirun; Jaturapitakkul, Natjiree

    2014-01-01

    University Admission Tests in Thailand are important documents which reflect Thailand's education system. To study at a higher education level, all students generally need to take the University Admission Tests designed by the National Institute of Educational Testing Service (NIETS). For the English test, vocabulary and reading comprehension is…

  1. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  2. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  3. Information Systems and Management Training.

    Science.gov (United States)

    Curry, B.; Smith, D. G.

    1991-01-01

    A case study of a South Wales manufacturer illustrates the need for companies to adopt an integrated strategy for computerization and information systems. Lack of management training blending computing and business skills can have a crippling effect on system development and organizational health. (SK)

  4. Tennessee Offender Management Information System

    OpenAIRE

    Beck, Tim

    1993-01-01

    This article describes the integration of a knowledge-based system with a large COBOL-DB2-based offender management system. The knowledge-based application, developed for the purpose of offender sentence calculation, is shown to provide several benefits, including a shortened development cycle, simplified maintenance, and improved accuracy over a previous COBOL-based application.

  5. An Admissions Officer's Credentials

    Science.gov (United States)

    Chronicle of Higher Education, 2007

    2007-01-01

    Marilee Jones has resigned as a dean of admissions at the Massachusetts Institute of Technology after admitting that she had misrepresented her academic degrees when first applying to work at the university in 1979. As one of the nation's most prominent admissions officers--and a leader in the movement to make the application process less…

  6. A Stunning Admission

    Science.gov (United States)

    Hu, Helen

    2012-01-01

    Few people set out to become admissions counselors, say people in the profession. But the field is requiring skills that are more demanding and varied than ever. And at a time when universities are looking especially hard at the bottom line, people in admissions need to constantly learn new things and make themselves indispensable. Counselors…

  7. Advice on Admissions Transparency

    Science.gov (United States)

    Australian Government Tertiary Education Quality and Standards Agency, 2018

    2018-01-01

    Admissions transparency means that prospective domestic undergraduate students can easily find good quality admissions information that allows them to compare courses and providers and make informed study choices. In October 2016 the Higher Education Standards Panel (HESP) made recommendations to achieve greater transparency in higher education…

  8. Automated plant, production management system

    Science.gov (United States)

    Aksenova, V. I.; Belov, V. I.

    1984-12-01

    The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.

  9. Electromagnetic spectrum management system

    Science.gov (United States)

    Seastrand, Douglas R.

    2017-01-31

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  10. Electromagnetic spectrum management system

    Energy Technology Data Exchange (ETDEWEB)

    Seastrand, Douglas R.

    2017-10-17

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  11. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  12. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  13. Technical Literature Review Concerning Management Information Systems.

    Science.gov (United States)

    interrelationships of the many aspects of management information systems (MIS); that is, with how analysis, design, operation, evaluation, and user considerations affect management information systems . (Author)

  14. Introduction to Management Information system

    OpenAIRE

    Mishra, Umakant

    2013-01-01

    A Management Information System (MIS) is a systematic organization and presentation of information that is generally required by the management of an organization for taking better decisions for the organization. The MIS data may be derived from various units of the organization or from other sources. However it is very difficult to say the exact structure of MIS as the structure and goals of different types of organizations are different. Hence both the data and structure of MIS is dependent...

  15. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. [Tennessee Univ., Knoxville, TN (United States)

    1992-08-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  16. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. (Tennessee Univ., Knoxville, TN (United States))

    1992-01-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  17. Intentional systems management: managing forests for biodiversity.

    Science.gov (United States)

    A.B. Carey; B.R. Lippke; J. Sessions

    1999-01-01

    Conservation of biodiversity provides for economic, social, and environmental sustainability. Intentional management is designed to manage conflicts among groups with conflicting interests. Our goal was to ascertain if intentional management and principles of conservation of biodiversity could be combined into upland and riparian forest management strategies that would...

  18. The CMS Data Management System

    Science.gov (United States)

    Giffels, M.; Guo, Y.; Kuznetsov, V.; Magini, N.; Wildish, T.

    2014-06-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  19. The CMS data management system

    International Nuclear Information System (INIS)

    Giffels, M; Magini, N; Guo, Y; Kuznetsov, V; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  20. Management of complex dynamical systems

    Science.gov (United States)

    MacKay, R. S.

    2018-02-01

    Complex dynamical systems are systems with many interdependent components which evolve in time. One might wish to control their trajectories, but a more practical alternative is to control just their statistical behaviour. In many contexts this would be both sufficient and a more realistic goal, e.g. climate and socio-economic systems. I refer to it as ‘management’ of complex dynamical systems. In this paper, some mathematics for management of complex dynamical systems is developed in the weakly dependent regime, and questions are posed for the strongly dependent regime.

  1. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  2. Treatment Episode Data Set: Admissions (TEDS-A-2002)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  3. Treatment Episode Data Set: Admissions (TEDS-A-1994)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  4. Treatment Episode Data Set: Admissions (TEDS-A-2008)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  5. Treatment Episode Data Set: Admissions (TEDS-A-2003)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  6. Treatment Episode Data Set: Admissions (TEDS-A-2006)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  7. Treatment Episode Data Set: Admissions (TEDS-A-2011)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  8. Treatment Episode Data Set: Admissions (TEDS-A-1999)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  9. Treatment Episode Data Set: Admissions (TEDS-A-1997)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  10. Treatment Episode Data Set: Admissions (TEDS-A-2000)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  11. Treatment Episode Data Set: Admissions (TEDS-A-2009)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  12. Treatment Episode Data Set: Admissions (TEDS-A-2010)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  13. Treatment Episode Data Set: Admissions (TEDS-A-1998)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  14. Treatment Episode Data Set: Admissions (TEDS-A-2007)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  15. Treatment Episode Data Set: Admissions (TEDS-A-1993)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  16. Treatment Episode Data Set: Admissions (TEDS-A-1995)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  17. Treatment Episode Data Set: Admissions (TEDS-A-1996)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  18. Treatment Episode Data Set: Admissions (TEDS-A-2005)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  19. Treatment Episode Data Set: Admissions (TEDS-A-1992)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  20. Treatment Episode Data Set: Admissions (TEDS-A-2001)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  1. Treatment Episode Data Set: Admissions (TEDS-A-2004)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  2. Treatment Episode Data Set: Admissions (TEDS-A-2013)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  3. Treatment Episode Data Set: Admissions (TEDS-A-2012)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Treatment Episode Data Set -- Admissions (TEDS-A) is a national census data system of annual admissions to substance abuse treatment facilities. TEDS-A provides...

  4. System of Enterprise Reputation Management

    Directory of Open Access Journals (Sweden)

    Derevianko Olena. H.

    2014-03-01

    Full Text Available The article offers a system of enterprise reputation management directed at increase of economic benefits from formation and maintenance of high reputation in the result of maximisation of the volume of the incoming cash flows of the enterprise and also their duration and stability. It proves that reputation management, which allows achievement of economic goals of the enterprise, should be directed at key groups of stakeholders: growth of products sales is ensured by consumers, growth of internal stability – by enterprise personnel, growth of external stability – by society, including authority bodies, growth of business value – by investors, owners and partners. The article describes components of the system of enterprise reputation management, the degree of development of which are determined by three vectors: interaction with stakeholders and level of their feedback: messaging, informing, convincing and attracting; activity of the used instruments of reputation management, regularity and intensity, and also quantitative indicators of their application within the framework of directions of the product PR, corporate PR and IR, internal PR, GR and PR-CSR; level of organisational pre-requisites (functional, system and strategic of the system of reputation management.

  5. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  6. 14 CFR 1212.704 - System manager.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  7. The European positional paper on rhinosinusitis and nasal polyps: has the introduction of guidance on the management of sinus disease affected uptake of surgery and acute admissions for sinusitis?

    Science.gov (United States)

    Cosway, Ben; Tomkinson, Alun; Owens, David

    2013-03-01

    Rhinosinusitis is a common condition with adults experiencing 2-5 episodes per year. The European Positional Paper on Rhinosinusitis and Nasal Polyps (EP3OS) published in 2005 and updated in 2007 provided evidence-based guidelines on the management of sinus disease promoting a conservative approach to treatment. This study examines the effect of EP3OS on sinus surgery uptake and acute admissions for sinusitis in England and Wales. A retrospective study using the national electronic health databases of England (Hospital Episodes Statistics, HES online) and Wales (Patient Episodes Database of Wales, PEDW) was undertaken from 2000 to 2010 using the OPCS-4 codes E12-E17 (sinus surgery) and ICD10 code J01 (acute admission for sinusitis). Data were analysed for effect following the introduction of the EP3OS in 2005 using linear regression and Chi squared analysis. 116,370 sinus procedures and 10,916 acute admissions for sinusitis were made during the study period. No significant decrease in sinus surgery procedures occurred following the introduction of the EP3OS as may have been expected (p > 0.05), although subgroup analysis suggested a significant increase in Wales (p introduction of EP3OS (p 0.05). The EP3OS appears to have had little impact on the rates of sinus surgery but more conservative approaches to managing of sinus disease may have led to an increase in acute admissions. Further research is required to investigate whether changes in practice were adopted.

  8. The SMAP Dictionary Management System

    Science.gov (United States)

    Smith, Kevin A.; Swan, Christoper A.

    2014-01-01

    The Soil Moisture Active Passive (SMAP) Dictionary Management System is a web-based tool to develop and store a mission dictionary. A mission dictionary defines the interface between a ground system and a spacecraft. In recent years, mission dictionaries have grown in size and scope, making it difficult for engineers across multiple disciplines to coordinate the dictionary development effort. The Dictionary Management Systemaddresses these issues by placing all dictionary information in one place, taking advantage of the efficiencies inherent in co-locating what were once disparate dictionary development efforts.

  9. Puberty menorrhagia Requiring Inpatient Admission

    Directory of Open Access Journals (Sweden)

    AH Khosla

    2010-06-01

    Full Text Available INTRODUCTION: Puberty menorrhagia is a significant health problem in adolescent age group and severe cases may require admission and blood transfusion. Aim of this study was to evaluate the causes, associated complications and management of puberty menorrhagia. METHODS: Hospital records of all patients of puberty menorrhagia requiring admission were analyzed for etiology, duration since menarche, duration of bleeding, investigation profile and management. RESULTS: There were 18 patients of puberty menorrhagia requiring hospital admission. Etiology was anovulatory bleeding in 11 patients, bleeding disorders in five which included idiopathic thrombocytopenia purpura in three and one each with Von-Willebrand disease and leukemia. Two patients had hypothyroidism as the cause. Fourteen patients presented with severe anaemia and required blood transfusion. All except one responded to oral hormonal therapy. CONCLUSIONS: Puberty menorrhagia can be associated with severe complications and requiring blood transfusion. Although most common cause is anovulation but bleeding disorder, other medical condition and other organic causes must be ruled out in any patient of Puberty menorrhagia. KEYWORDS: anovulation, bleeding disorder, puberty, menorrhagia, anaemia.

  10. Emergency department case management: the dyad team of nurse case manager and social worker improve discharge planning and patient and staff satisfaction while decreasing inappropriate admissions and costs: a literature review.

    Science.gov (United States)

    Bristow, Darlene P; Herrick, Charlotte A

    2002-01-01

    A model of emergency department (ED) case management consisting of a social worker and a nurse case manager can prevent inappropriate admissions, improve discharge planning, decrease cost, and enhance patient satisfaction. The individual and combined roles of the dyad team of social worker and nurse case manager are discussed. A literature review includes how a case management dyad team of social worker and nurse case manager in the ED can decrease utilization of the ED for nonemergent visits, promote the use of community resources, and improve discharge planning to avoid excessive costs. The importance of the dyad team working with the interdisciplinary team in the ED, the primary care physician (PCP), and other community health care providers in order to provide a holistic approach to care is addressed. A discussion about the improvement of both patient and staff satisfaction demonstrates the results of case management strategies that support and advocate for patients to receive quality, cost-effective care across the health care continuum, while decreasing the use of the ED for nonemergent care.

  11. The Prototype Automated Research Management System (ARMS)

    National Research Council Canada - National Science Library

    Prekop, Paul

    2004-01-01

    Automated Research Management System (ARMS) is a knowledge management application designed to address many of the knowledge management problems identified by SmartWays and FASSP's Knowledge Management Review...

  12. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  13. Networked inventory management systems: materializing supply chain management

    NARCIS (Netherlands)

    Verwijmeren, M.A.A.P.; Vlist, van der P.; Donselaar, van K.H.

    1996-01-01

    Aims to explain the driving forces for networked inventory management. Discusses major developments with respect to customer requirements, networked organizations and networked inventory management. Presents high level specifications of networked inventory management information systems (NIMISs).

  14. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  15. Data management system performance modeling

    Science.gov (United States)

    Kiser, Larry M.

    1993-01-01

    This paper discusses analytical techniques that have been used to gain a better understanding of the Space Station Freedom's (SSF's) Data Management System (DMS). The DMS is a complex, distributed, real-time computer system that has been redesigned numerous times. The implications of these redesigns have not been fully analyzed. This paper discusses the advantages and disadvantages for static analytical techniques such as Rate Monotonic Analysis (RMA) and also provides a rationale for dynamic modeling. Factors such as system architecture, processor utilization, bus architecture, queuing, etc. are well suited for analysis with a dynamic model. The significance of performance measures for a real-time system are discussed.

  16. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  17. Intelligent power system data management systems (DBMS)

    Energy Technology Data Exchange (ETDEWEB)

    Middleton, A.; Macdonald, E. [GE Digital Energy, Markham, ON (Canada); Schreiner, Z. [Intelligent Process Solutions GmbH, Lindau (Germany); Bizjak, J. [Elektro Ljubljana d.d., Ljubljana (Slovenia)

    2010-07-01

    Network owners/operators from around the world have moved from electromechanical products to intelligent electronic devices (IEDs). Most networks have a multi-generation technology mix because protection assets have a normal application lifespan of between 10 and 40 years. Associated data capture and maintenance management regimes have therefore moved from paper based into digitized media, creating a significant increase in the volume of acquired data, such that there is now a mix of paper and digitized storage. Data is rarely consolidated or used for decision making in asset management processes once testing is completed, having a major impact on overall power system reliability. This paper presented the concept of intelligent operative maintenance management, now becoming more recognized in the industry. The concept was described as the management of operational data, resulting actions and responses, wherever and by whoever they are needed, without any additional overhead. The paper discussed new techniques of testing as well as planning and operative maintenance. The practical benefits of the new system were also presented, with particular reference to central management; simplification of routine protocols; secondary testing; and reduced cost of data handling. It was concluded that the main benefit from all of the techniques discussed in this paper is that experienced expert test engineers can focus more time upon making good, critical decisions to ensure that utilities maximize their customer service and safety regimes. 13 refs., 7 figs.

  18. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  19. Information system revives materials management

    International Nuclear Information System (INIS)

    Hansen, T.

    1995-01-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD)

  20. Exploring unplanned ICU admissions: a systematic review.

    Science.gov (United States)

    Vlayen, Annemie; Verelst, Sandra; Bekkering, Geertruida E; Schrooten, Ward; Hellings, Johan; Claes, Nerée

    Adverse events are unintended patient injuries or complications that arise from healthcare management resulting in death, disability or prolonged hospital stay. Adverse events that require critical care are a considerable financial burden to the healthcare system. Medical record review seems to be a reliable method for detecting adverse events. To synthesize the best available evidence regarding the estimates of the incidence and preventability of adverse events that necessitate intensive care admission; to determine the type and consequences (patient harm, mortality, length of ICU stay and direct medical costs) of these adverse events. MEDLINE (from 1966 to present), EMBASE (from 1974 to present) and CENTRAL (version 1-2010) were searched for studies reporting on unplanned admissions to intensive care units (ICUs). Databases of reports, conference proceedings, grey literature, ongoing research, relevant patient safety organizations and two journals were searched for additional studies. Reference lists of retrieved papers were searched and authors were contacted in an attempt to find any further published or unpublished work. Only quantitative studies that used chart review for the detection of adverse events requiring intensive care admission were considered for eligibility. Studies that were published in the English, Dutch, German, French or Spanish language were included. Two reviewers independently extracted data and assessed the methodological quality of the included studies. 28 studies in the English language and one study in French were included. Of these, two were considered duplicate publications and therefore 27 studies were reviewed. Meta-analysis of the data was not appropriate due to statistical heterogeneity between studies; therefore, results are presented in a descriptive way. Studies were categorized according to the population and the providers of care. 1) The majority of the included studies investigated unplanned intensive care admissions after

  1. Systems approach in energy management

    International Nuclear Information System (INIS)

    Dutta-Choudhury, K.

    1993-01-01

    Several years ago when the author was working in the chemicals division of a paper company in Instrumentation and Controls, one experience had a lasting impact on his work approach which is systems approach. The maintenance manager told the author that a very important piece of boiler instrument of the power plant had broken down and delivery of the replacement needed to be expedited. The instrument was ordered over the phone in another city. The purchase order was personally delivered at the supplier's office and arrangements were made so the instrument was put on the next flight. A week later the maintenance manager indicated that the particular instrument still had not arrived in the plant and he could not run the power plant. Thus the company incurred substantial losses. Further inquiries showed that the instrument did indeed arrive at the plant stores on time. But, in the absence of any instructions thereon, the instrument was not delivered to the power plant. The sense of urgency was lost in the existing delivery process. In other words, the process or system failed. The whole process from requisitioning to delivery of ordered items was analyzed and corrective procedures were incorporated to prevent future repetitions. This brings up the subject of systems approach in engineering management in general and energy management in particular. This involves defining an objective and designing a system for an effective way of getting there

  2. Grenada Education Management Information System

    OpenAIRE

    Porta, Emilio; Klein, Jennifer; Arcia, Gustavo; Nannyonjo, Harriet

    2012-01-01

    The Education Management Information System (EMIS) country report for Grenada includes the following headings: background which includes education data in Grenada, EMIS staff, facilities and equipment, EMIS data, and publications; prerequisites of quality; assurances of integrity; methodological soundness; accuracy and reliability; serviceability; and accessibility.

  3. DEVELOPMENT OF MANAGEMENT INFORMATION SYSTEMS

    OpenAIRE

    Wiesław Samitowski

    2016-01-01

    On the basis of many years of experience in providing consulting services in the area of management, the author presents the issues regarding the development of information systems to be applied in business. The analysis is conducted within the framework of a field of study introduced by the author and referred to as infornomics.

  4. Managing conflicts in systems development.

    Science.gov (United States)

    Barnett, E

    1997-05-01

    Conflict in systems development is nothing new. It can vary in intensity, but there will always be two possible outcomes--one constructive and the other destructive. The common approach to conflict management is to draw the battle lines and apply brute force. However, there are other ways to deal with conflict that are more effective and more people oriented.

  5. A System Architecture for Autonomous Demand Side Load Management in Smart Buildings

    DEFF Research Database (Denmark)

    Costanzo, Giuseppe Tommaso; Zhu, Guchuan; Anjos, Miguel F.

    2012-01-01

    This paper presents a system architecture for load management in smart buildings which enables autonomous demand side load management in the smart grid. Being of a layered structure composed of three main modules for admission control, load balancing, and demand response management...... in multiple time-scales and allows seamless integration of diverse techniques for online operation control, optimal scheduling, and dynamic pricing. The design of a home energy manager based on this architecture is illustrated and the simulation results with Matlab/Simulink confirm the viability...

  6. OSPACS: Ultrasound image management system

    Directory of Open Access Journals (Sweden)

    Bessant Conrad

    2008-06-01

    Full Text Available Abstract Background Ultrasound scanning uses the medical imaging format, DICOM, for electronically storing the images and data associated with a particular scan. Large health care facilities typically use a picture archiving and communication system (PACS for storing and retrieving such images. However, these systems are usually not suitable for managing large collections of anonymized ultrasound images gathered during a clinical screening trial. Results We have developed a system enabling the accurate archiving and management of ultrasound images gathered during a clinical screening trial. It is based upon a Windows application utilizing an open-source DICOM image viewer and a relational database. The system automates the bulk import of DICOM files from removable media by cross-validating the patient information against an external database, anonymizing the data as well as the image, and then storing the contents of the file as a field in a database record. These image records may then be retrieved from the database and presented in a tree-view control so that the user can select particular images for display in a DICOM viewer or export them to external media. Conclusion This system provides error-free automation of ultrasound image archiving and management, suitable for use in a clinical trial. An open-source project has been established to promote continued development of the system.

  7. Automated Car Park Management System

    Science.gov (United States)

    Fabros, J. P.; Tabañag, D.; Espra, A.; Gerasta, O. J.

    2015-06-01

    This study aims to develop a prototype for an Automated Car Park Management System that will increase the quality of service of parking lots through the integration of a smart system that assists motorist in finding vacant parking lot. The research was based on implementing an operating system and a monitoring system for parking system without the use of manpower. This will include Parking Guidance and Information System concept which will efficiently assist motorists and ensures the safety of the vehicles and the valuables inside the vehicle. For monitoring, Optical Character Recognition was employed to monitor and put into list all the cars entering the parking area. All parking events in this system are visible via MATLAB GUI which contain time-in, time-out, time consumed information and also the lot number where the car parks. To put into reality, this system has a payment method, and it comes via a coin slot operation to control the exit gate. The Automated Car Park Management System was successfully built by utilizing microcontrollers specifically one PIC18f4550 and two PIC16F84s and one PIC16F628A.

  8. Undergraduate Admissions | NSU

    Science.gov (United States)

    . Continuing Education Financial Aid Career Development Regional Campuses International Affairs Veterans Admissions Honors College Experiential Education Study Abroad Research Opportunities Career Preparation SharkLink California Disclosure International Affairs Undergraduate Advising Career Development Libraries at

  9. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  10. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  11. Nonimmigrant Admissions: Fiscal Year 2008

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  12. Nonimmigrant Admissions: Fiscal Year 2012

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  13. Nonimmigrant Admissions - Fiscal Year 2013

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  14. Nonimmigrant Admissions: Fiscal Year 2005

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  15. Nonimmigrant Admissions: Fiscal Year 2016

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  16. Nonimmigrant Admissions: Fiscal Year 2010

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  17. Nonimmigrant Admissions: Fiscal Year 2006

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  18. Nonimmigrant Admission: Fiscal Year 2007

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  19. Nonimmigrant Admissions: Fiscal Year 2014

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  20. Nonimmigrant Admissions: Fiscal Year 2009

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  1. Nonimmigrant Admissions: Fiscal Year 2011

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  2. Nonimmigrant Admissions: Fiscal Year 2004

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  3. Nonimmigrant Admissions: Fiscal Year 2015

    Data.gov (United States)

    Department of Homeland Security — Nonimmigrants are foreign nationals granted temporary admission into the United States. The major purposes for which nonimmigrant admission may be authorized include...

  4. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  5. Metrics for border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  6. MIMS - MEDICAL INFORMATION MANAGEMENT SYSTEM

    Science.gov (United States)

    Frankowski, J. W.

    1994-01-01

    MIMS, Medical Information Management System is an interactive, general purpose information storage and retrieval system. It was first designed to be used in medical data management, and can be used to handle all aspects of data related to patient care. Other areas of application for MIMS include: managing occupational safety data in the public and private sectors; handling judicial information where speed and accuracy are high priorities; systemizing purchasing and procurement systems; and analyzing organizational cost structures. Because of its free format design, MIMS can offer immediate assistance where manipulation of large data bases is required. File structures, data categories, field lengths and formats, including alphabetic and/or numeric, are all user defined. The user can quickly and efficiently extract, display, and analyze the data. Three means of extracting data are provided: certain short items of information, such as social security numbers, can be used to uniquely identify each record for quick access; records can be selected which match conditions defined by the user; and specific categories of data can be selected. Data may be displayed and analyzed in several ways which include: generating tabular information assembled from comparison of all the records on the system; generating statistical information on numeric data such as means, standard deviations and standard errors; and displaying formatted listings of output data. The MIMS program is written in Microsoft FORTRAN-77. It was designed to operate on IBM Personal Computers and compatibles running under PC or MS DOS 2.00 or higher. MIMS was developed in 1987.

  7. The LHCb Data Management System

    International Nuclear Information System (INIS)

    Baud, J P; Charpentier, Ph; Ciba, K; Lanciotti, E; Màthè, Z; Graciani, R; Remenska, D; Santana, R

    2012-01-01

    The LHCb Data Management System is based on the DIRAC Grid Community Solution. LHCbDirac provides extensions to the basic DMS such as a Bookkeeping System. Datasets are defined as sets of files corresponding to a given query in the Bookkeeping system. Datasets can be manipulated by CLI tools as well as by automatic transformations (removal, replication, processing). A dynamic handling of dataset replication is performed, based on disk space usage at the sites and dataset popularity. For custodial storage, an on-demand recall of files from tape is performed, driven by the requests of the jobs, including disk cache handling. We shall describe the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behavior of LHCb Storage capacity.

  8. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  9. Validation of APACHE II scoring system at 24 hours after admission as a prognostic tool in urosepsis: A prospective observational study

    Directory of Open Access Journals (Sweden)

    Sundaramoorthy VijayGanapathy

    2017-11-01

    Full Text Available Purpose: Urosepsis implies clinically evident severe infection of urinary tract with features of systemic inflammatory response syndrome (SIRS. We validate the role of a single Acute Physiology and Chronic Health Evaluation II (APACHE II score at 24 hours after admission in predicting mortality in urosepsis. Materials and Methods: A prospective observational study was done in 178 patients admitted with urosepsis in the Department of Urology, in a tertiary care institute from January 2015 to August 2016. Patients >18 years diagnosed as urosepsis using SIRS criteria with positive urine or blood culture for bacteria were included. At 24 hours after admission to intensive care unit, APACHE II score was calculated using 12 physiological variables, age and chronic health. Results: Mean±standard deviation (SD APACHE II score was 26.03±7.03. It was 24.31±6.48 in survivors and 32.39±5.09 in those expired (p<0.001. Among patients undergoing surgery, mean±SD score was higher (30.74±4.85 than among survivors (24.30±6.54 (p<0.001. Receiver operating characteristic (ROC analysis revealed area under curve (AUC of 0.825 with cutoff 25.5 being 94.7% sensitive and 56.4% specific to predict mortality. Mean±SD score in those undergoing surgery was 25.22±6.70 and was lesser than those who did not undergo surgery (28.44±7.49 (p=0.007. ROC analysis revealed AUC of 0.760 with cutoff 25.5 being 94.7% sensitive and 45.6% specific to predict mortality even after surgery. Conclusions: A single APACHE II score assessed at 24 hours after admission was able to predict morbidity, mortality, need for surgical intervention, length of hospitalization, treatment success and outcome in urosepsis patients.

  10. Validation of APACHE II scoring system at 24 hours after admission as a prognostic tool in urosepsis: A prospective observational study.

    Science.gov (United States)

    VijayGanapathy, Sundaramoorthy; Karthikeyan, VIlvapathy Senguttuvan; Sreenivas, Jayaram; Mallya, Ashwin; Keshavamurthy, Ramaiah

    2017-11-01

    Urosepsis implies clinically evident severe infection of urinary tract with features of systemic inflammatory response syndrome (SIRS). We validate the role of a single Acute Physiology and Chronic Health Evaluation II (APACHE II) score at 24 hours after admission in predicting mortality in urosepsis. A prospective observational study was done in 178 patients admitted with urosepsis in the Department of Urology, in a tertiary care institute from January 2015 to August 2016. Patients >18 years diagnosed as urosepsis using SIRS criteria with positive urine or blood culture for bacteria were included. At 24 hours after admission to intensive care unit, APACHE II score was calculated using 12 physiological variables, age and chronic health. Mean±standard deviation (SD) APACHE II score was 26.03±7.03. It was 24.31±6.48 in survivors and 32.39±5.09 in those expired (p<0.001). Among patients undergoing surgery, mean±SD score was higher (30.74±4.85) than among survivors (24.30±6.54) (p<0.001). Receiver operating characteristic (ROC) analysis revealed area under curve (AUC) of 0.825 with cutoff 25.5 being 94.7% sensitive and 56.4% specific to predict mortality. Mean±SD score in those undergoing surgery was 25.22±6.70 and was lesser than those who did not undergo surgery (28.44±7.49) (p=0.007). ROC analysis revealed AUC of 0.760 with cutoff 25.5 being 94.7% sensitive and 45.6% specific to predict mortality even after surgery. A single APACHE II score assessed at 24 hours after admission was able to predict morbidity, mortality, need for surgical intervention, length of hospitalization, treatment success and outcome in urosepsis patients.

  11. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Fill, Michael; Simonsen, Martin

    2007-01-01

    . In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  12. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Hansen, Michael Fiil

    2006-01-01

    . In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  13. ISO 14000 : environmental management systems

    International Nuclear Information System (INIS)

    Boutin, C.; Emard, C.; Lalonde, G.; Levesque, A.; Robitaille, R.; Rollin, A.L.; Thibeault, I.

    1996-01-01

    This book is addressed to the managers, professionals, and government agents which wish to know the philosophy of the step as well as the stages to be followed for the establishment of a system of environmental management in conformity with the standards of the series ISO 14000. This work locates ISO 14000 in the historical context of its development by describing the bonds with other standards in place of which those of the series ISO 9000. This book answers questions that arise regarding a companies step toward accreditation to ISO 14000

  14. The Cheetah data management system

    International Nuclear Information System (INIS)

    Kunz, P.F.; Word, G.B.

    1992-09-01

    Cheetah is a data management system based on the C programming language, with support for other languages. Its main goal is to transfer data between memory and I/O steams in a general way. The streams are either associated with disk files or are network data stems. Cheetah provides optional convenience functions to assist in the management of C structures. Cheetah steams are self-describing so that general purpose applications can fully understand an incoming steam. This information can be used to display the data in an incoming steam to the user of an interactive general application, complete with variable names and optional comments

  15. Radiology information management system, TOSRIM

    International Nuclear Information System (INIS)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito

    1991-01-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author)

  16. Radiology information management system, TOSRIM

    Energy Technology Data Exchange (ETDEWEB)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito (Toshiba Corp., Kawasaki, Kanagawa (Japan))

    1991-02-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author).

  17. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  18. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  19. Spatial Data Management System (SDMS)

    Science.gov (United States)

    Hutchison, Mark W.

    1994-01-01

    The Spatial Data Management System (SDMS) is a testbed for retrieval and display of spatially related material. SDMS permits the linkage of large graphical display objects with detail displays and explanations of its smaller components. SDMS combines UNIX workstations, MIT's X Window system, TCP/IP and WAIS information retrieval technology to prototype a means of associating aggregate data linked via spatial orientation. SDMS capitalizes upon and extends previous accomplishments of the Software Technology Branch in the area of Virtual Reality and Automated Library Systems.

  20. OSH management systems in enterprises

    Directory of Open Access Journals (Sweden)

    B. Kalandyk

    2010-04-01

    Full Text Available Nowadays, in modern companies and enterprises, safety means much more than only the evaluation of risk and analysis of accidents. Theactivities in the area of the occupational health and safety should form an integral part of the enterprise management system. According toa framework directive no 89/391/EEC the EU member states are obliged to implement standards related with the occupational health andsafety systems. The standard most popular and used most commonly, as applicable to enterprises of any type, is the international OHSAS18001 system and in Poland Polish Standards PN-N-18001.

  1. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  2. Respiratory care management information systems.

    Science.gov (United States)

    Ford, Richard M

    2004-04-01

    Hospital-wide computerized information systems evolved from the need to capture patient information and perform billing and other financial functions. These systems, however, have fallen short of meeting the needs of respiratory care departments regarding work load assessment, productivity management, and the level of outcome reporting required to support programs such as patient-driven protocols. The respiratory care management information systems (RCMIS) of today offer many advantages over paper-based systems and hospital-wide computer systems. RCMIS are designed to facilitate functions specific to respiratory care, including assessing work demand, assigning and tracking resources, charting, billing, and reporting results. RCMIS incorporate mobile, point-of-care charting and are highly configurable to meet the specific needs of individual respiratory care departments. Important and substantial benefits can be realized with an RCMIS and mobile, wireless charting devices. The initial and ongoing costs of an RCMIS are justified by increased charge capture and reduced costs, by way of improved productivity and efficiency. It is not unusual to recover the total cost of an RCMIS within the first year of its operation. In addition, such systems can facilitate and monitor patient-care protocols and help to efficiently manage the vast amounts of information encountered during the practitioner's workday. Respiratory care departments that invest in RCMIS have an advantage in the provision of quality care and in reducing expenses. A centralized respiratory therapy department with an RCMIS is the most efficient and cost-effective way to monitor work demand and manage the hospital-wide allocation of respiratory care services.

  3. [Evaluation of the appropriateness of hospital admissions using the iso-gravity classification systems APR-DRG and Disease Staging and the Italian version of Appropriateness Evaluation Protocol (AEP)].

    Science.gov (United States)

    D'Andrea, G; Capalbo, G; Volpe, M; Marchetti, M; Vicentini, F; Capelli, G; Cambieri, A; Cicchetti, A; Ricciardi, G; Catananti, C

    2006-01-01

    Our main purpose was to evaluate the organizational appropriateness of admissions made in a university hospital, by comparing two iso-gravity classification systems, APR-DRG and Disease Staging, with the Italian version of AEP (PRUO). Our analysis focused on admissions made in 2001, related to specific Diagnosis Related Groups (DRGs), which, according an Italian Law, would be considered at high risk of inappropriateness, if treated as ordinary admissions. The results obtained by using the 2 classification systems did not show statistically significant differences with respect to the total number of admissions. On the other hand, some DRGs showed statistically significant differences due to different algorithms of attribution of the severity levels used by the two systems. For almost all of the DRGs studied, the AEP-based analysis of a sample of medical records showed an higher number of inappropriate admissions in comparison with the number expected by iso-gravity classification methods. The difference is possibly due to the percentage limits of tolerability fixed by the Law for each DRG. Therefore, the authors suggest an integrated use of the two methods to evaluate organizational appropriateness of hospital admissions.

  4. Pattern of non-communicable diseases among medical admissions ...

    African Journals Online (AJOL)

    Medical admissions due to non-communicable diseases were carefully selected and analyzed. There were 1853 cases of various non-communicable diseases out of a total medical admission of 3294 constituting 56.2% of total medical admissions. Diseases of the cardiovascular, endocrine and renal systems were the most ...

  5. Knowledge management systems in practice

    DEFF Research Database (Denmark)

    Tørning, Kristian

    which has the strategy of working with knowledge in the form of "best practices" meant to boost performance. The thesis explores the situation that workers are in, since they are meant to share and develop "best practices" knowledge in a portal based Knowledge Management System (KMS). The study...... indentifies a set of problems that prevents knowledge sharing from taking place to the degree to which management was specifically aiming. It was explored whether these problems could, to some degree, be mitigated by employing persuasive design, which is a new stance towards design where the aim...... is to directly seek to change the user's behavior, i.e., persuading more knowledge sharing. The main contribution is an indication of an anomaly with regards to the strategic approach towards knowledge management, where knowledge sharing is seen as an effort by which companies can gain a competitive advantage...

  6. International safeguards data management system

    International Nuclear Information System (INIS)

    Argentesi, F.; Costantini, L.; Franklin, M.; Dondi, M.G.

    1981-01-01

    The data base management system ''ISADAM'' (i.e. International Safeguards Data Management System) described in this report is intended to facilitate the safeguards authority in making efficient and effective use of accounting reports. ISADAM has been developed using the ADABAS data base management system and is implemented on the JRC-Ispra computer. The evaluation of safeguards declarations focuses on three main objectives: - the requirement of syntactical consistency with the legal conventions of data recording for safeguards accountancy; - the requirement of accounting evidence that there is no material unaccounted for (MUF); - the requirement of semantic consistency with the technological characteristics of the plant and the processing plans of the operator. Section 2 describes in more detail the facilities which ISADAM makes available to a safeguards inspector. Section 3 describes how the MUF variance computation is derived from models of measurement error propagation. Many features of the ISADAM system are automatically provided by ADABAS. The exceptions to this are the utility software designed to: - screen plant declarations before loading into the data base, - prepare variance summary files designed to support real-time computation of MUF and variance of MUF, - provide analyses in response to user requests in interactive or batch mode. Section 4 describes the structure and functions of this software which have been developed by JRC-Ispra

  7. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  8. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  9. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  10. Data management system advanced development

    Science.gov (United States)

    Douglas, Katherine; Humphries, Terry

    1990-01-01

    The Data Management System (DMS) Advanced Development task provides for the development of concepts, new tools, DMS services, and for the testing of the Space Station DMS hardware and software. It also provides for the development of techniques capable of determining the effects of system changes/enhancements, additions of new technology, and/or hardware and software growth on system performance. This paper will address the built-in characteristics which will support network monitoring requirements in the design of the evolving DMS network implementation, functional and performance requirements for a real-time, multiprogramming, multiprocessor operating system, and the possible use of advanced development techniques such as expert systems and artificial intelligence tools in the DMS design.

  11. A computerized legal information management system | Ohiagu ...

    African Journals Online (AJOL)

    A computerized legal information management system. ... process through the filling system using the survey research methodology. ... A framework for the design and implementation of a legal information management system was presented.

  12. Overview of Management Systems. No. 157.

    Science.gov (United States)

    Goddu, Roland

    The need for organizational management is discussed, and educational management systems are examined, with attention paid to organizational components and different approaches to organizational control. (MJB)

  13. An admissions system to select veterinary medical students with an interest in food animals and veterinary public health.

    Science.gov (United States)

    Haarhuis, Jan C M; Muijtjens, Arno M M; Scherpbier, Albert J J A; van Beukelen, Peter

    2009-01-01

    Interest in the areas of food animals (FA) and veterinary public health (VPH) appears to be declining among prospective students of veterinary medicine. To address the expected shortage of veterinarians in these areas, the Utrecht Faculty of Veterinary Medicine has developed an admissions procedure to select undergraduates whose aptitude and interests are suited to these areas. A study using expert meetings, open interviews, and document analysis identified personal characteristics that distinguished veterinarians working in the areas of FA and VPH from their colleagues who specialized in companion animals (CA) and equine medicine (E). The outcomes were used to create a written selection tool. We validated this tool in a study among undergraduate veterinary students in their final (sixth) year before graduation. The applicability of the tool was verified in a study among first-year students who had opted to pursue either FA/VPH or CA/E. The tool revealed statistically significant differences with acceptable effect sizes between the two student groups. Because the written selection tool did not cover all of the differences between the veterinarians who specialized in FA/VPH and those who specialized in CA/E, we developed a prestructured panel interview and added it to the questionnaire. The evaluation of the written component showed that it was suitable for selecting those students who were most likely to succeed in the FA/VPH track.

  14. Validation of the MARS (Medical Admission Risk System): A combined physiological and laboratory risk prediction tool for 5- to 7-day in-hospital mortality.

    Science.gov (United States)

    Ohman, Malin Charlotta; Atkins, Tara E Holm; Cooksley, Tim; Brabrand, Mikkel

    2018-03-10

    The MARS (Medical Admission Risk System) uses 11 physiological and laboratory data and had promising results in its derivation study for predicting 5 and 7 day mortality. To perform an external independent validation of the MARS score. An unplanned secondary cohort study. Patients admitted to the medical admission unit (MAU) at The Hospital of South West Jutland were included from 2 October 2008 until 19 February 2009 and 23 February 2010 until 26 May 2010 were analysed. Validation of the MARS score using 5 and 7 day mortality was the primary endpoint. 5858 patients were included in the study. 2923 (49.9%) patients were women with a median age of 65 years (15-107). The MARS score had an AUROC of 0.858 (95% CI: 0.831-0.884) for 5-day mortality and 0.844 (0.818-0.870) for 7 day mortality with poor calibration for both outcomes. The MARS score had excellent discriminatory power but poor calibration in predicting both 5 and 7-day mortality. The development of accurate combination physiological/laboratory data risk scores has the potential to improve the recognition of at risk patients.

  15. ISO 9001 quality management systems

    CERN Document Server

    Natarajan, Dhanasekharan

    2017-01-01

    This book explains the requirements of ISO 9001 for establishing quality management system (QMS) for an organization. The requirements are illustrated with examples from industries for understanding the requirements and preparing the documents of QMS with high clarity. Methods of integrating ISO 9001 requirements with enterprise resource planning (ERP) software are presented. The software integrated approach enables process owners to focus on their core tasks of achieving the planned outputs of processes and the software generates quality records automatically.

  16. ISO 9000 Quality Management System

    Science.gov (United States)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  17. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  18. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  19. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  20. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  1. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  2. The system for waste management

    International Nuclear Information System (INIS)

    Hennelly, E.J.

    1987-01-01

    The author views the system for the management of high level radioactive waste as having five major components science and technology, domestic politics, international programs, regulation and institutions, and the ever changing rules and public perceptions. A system failure will usually occur because of the failure to communicate and not because of inadequate scientific data or engineering skills. For effective communication to occur the participants need to understand each other. The author will focus on this issue as a major theme of this presentation

  3. Environmental management & audit 2: Management systems

    OpenAIRE

    2018-01-01

    The present scientific monograph, entitled “Environmental management & audit“, is the result of three years’ work on an international project entitled “Environmental management in Russian companies – retraining courses for the sensibilization for and integration of Eco-Audit programs in corporate decision-making (RECOAUD)”. Within its more than 600 pages, the monograph features interesting texts written by 31 authors from the European Union and the Russian Federation, edited by dr. Borut Jere...

  4. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    Science.gov (United States)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  5. Predicting Appropriate Admission of Bronchiolitis Patients in the Emergency Department: Rationale and Methods.

    Science.gov (United States)

    Luo, Gang; Stone, Bryan L; Johnson, Michael D; Nkoy, Flory L

    2016-03-07

    In young children, bronchiolitis is the most common illness resulting in hospitalization. For children less than age 2, bronchiolitis incurs an annual total inpatient cost of $1.73 billion. Each year in the United States, 287,000 emergency department (ED) visits occur because of bronchiolitis, with a hospital admission rate of 32%-40%. Due to a lack of evidence and objective criteria for managing bronchiolitis, ED disposition decisions (hospital admission or discharge to home) are often made subjectively, resulting in significant practice variation. Studies reviewing admission need suggest that up to 29% of admissions from the ED are unnecessary. About 6% of ED discharges for bronchiolitis result in ED returns with admission. These inappropriate dispositions waste limited health care resources, increase patient and parental distress, expose patients to iatrogenic risks, and worsen outcomes. Existing clinical guidelines for bronchiolitis offer limited improvement in patient outcomes. Methodological shortcomings include that the guidelines provide no specific thresholds for ED decisions to admit or to discharge, have an insufficient level of detail, and do not account for differences in patient and illness characteristics including co-morbidities. Predictive models are frequently used to complement clinical guidelines, reduce practice variation, and improve clinicians' decision making. Used in real time, predictive models can present objective criteria supported by historical data for an individualized disease management plan and guide admission decisions. However, existing predictive models for ED patients with bronchiolitis have limitations, including low accuracy and the assumption that the actual ED disposition decision was appropriate. To date, no operational definition of appropriate admission exists. No model has been built based on appropriate admissions, which include both actual admissions that were necessary and actual ED discharges that were unsafe. The

  6. Electric vehicle energy management system

    Science.gov (United States)

    Alaoui, Chakib

    This thesis investigates and analyzes novel strategies for the optimum energy management of electric vehicles (EVs). These are aimed to maximize the useful life of the EV batteries and make the EV more practical in order to increase its acceptability to market. The first strategy concerns the right choice of the batteries for the EV according to the user's driving habits, which may vary. Tests conducted at the University of Massachusetts Lowell battery lab show that the batteries perform differently from one manufacturer to the other. The second strategy was to investigate the fast chargeability of different batteries, which leads to reduce the time needed to recharge the EV battery pack. Tests were conducted again to prove that only few battery types could be fast charged. Test data were used to design a fast battery charger that could be installed in an EV charging station. The third strategy was the design, fabrication and application of an Electric Vehicle Diagnostic and Rejuvenation System (EVDRS). This system is based on Mosfet Controlled Thyristors (MCTs). It is capable of quickly identifying any failing battery(s) within the EV pack and rejuvenating the whole battery pack without dismantling them and unloading them. A novel algorithm to rejuvenate Electric Vehicle Sealed Lead Acid Batteries is described. This rejuvenation extends the useful life of the batteries and makes the EV more competitive. The fourth strategy was to design a thermal management system for EV, which is crucial to the safe operation, and the achievement of normal/optimal performance of, electric vehicle (EV) batteries. A novel approach for EV thermal management, based on Pettier-Effect heat pumps, was designed, fabricated and tested in EV. It shows the application of this type of technology for thermal management of EVs.

  7. Root Cause Analysis of Diabetic Ketoacidosis Admissions at a Tertiary Referral Pediatric Emergency Department in North India

    OpenAIRE

    Jayashree, Muralidharan; Sasidharan, Rohit; Singhi, Sunit; Nallasamy, Karthi; Baalaaji, Mullai

    2017-01-01

    Objectives: To identify system-based factors contributing to Emergency Department (ED) admissions of children with diabetic ketoacidosis (DKA) and related complications with emphasis on parental and physician awareness and prereferral management. Materials and Methods: A prospective observational root cause analysis study of all consecutive admissions of children with DKA to pediatric ED of a tertiary care referral hospital in northern India over a period of 1 year (July 2010–June 2011). Preh...

  8. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  9. CIMS: The Cartographic Information Management System,

    Science.gov (United States)

    1981-01-01

    use. Large-scale information systems may cover large amounts of information such as the Land Identification and Information Management System (LIMS...small computer in managing the information holdings of a mapping institute. The result is the Cartographic Information Management System (CIMS), a...American countrie.s. 1 .- - _ _ _ _. = _ m m m THE CARTOGRAPHIC INFORMATION MANAGEMENT SYSTEM System Rationale Interactive computer-assisted cartography

  10. TRAMWAY MANAGEMENT SYSTEM IN INDONESIA

    Directory of Open Access Journals (Sweden)

    Melia Damayanti

    2015-01-01

    Full Text Available Tramway systems, which can carry more passengers than buses at one haul, are now being proposed to meet Indonesia’s public transport requirement. The objective of this research is to analyze the management structures for operating tram in different countries and then propose a suitable organizational structure for operating trams, if re-introduced, in Indonesia. The author chose France (Montpellier tramway, Germany (Karlsruhe tram-train and the UK (Nottingham Express Transit as the role model countries for investigation. From the analysis, the most appropriate organizational structure and suitable tramway management structure for operating tramways implementation in Indonesia. The key features of the research are to establish public transport company by local government to manage all public transport systems, propose tramway construction and operation to exist as separate departments under the tramway team division of the public company, recommend the public transport company to have responsibility for overseeing construction of the trams, operating, and maintaining the trams, suggest local government to own them and have responsibility for tramway strategic policy, control regulation as well as supervision and coordination of the performance of the public transport company, propose joint working between public and private sectors.

  11. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  12. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  13. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  14. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  15. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    Ferreira and Otley’s (2009) conceptual and holistic framework for performance management systems, supplemented by elements of contextual factors and organisational culture. Further, selected researchers’ perceptions of the purpose of using management control systems are related to practitioners’ ideas......The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  16. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  17. A rural transit asset management system

    Science.gov (United States)

    2005-01-01

    This reports the research undertaken to create an interactive, geographic information system based asset management system for the Alabama Department of Transportation to manage vehicles purchased and operated through Section 5310 and 5311 federal gr...

  18. Environmental Management System ISO 14001

    CERN Document Server

    Haider, Syed

    2010-01-01

    This is a must-have tool for any company in the process of adopting and incorporating the ISO 14001:2004 requirements, this book and accompanying CD-ROM provides the latest updates and amendments and translates the ISO language into actionable strategy. Offering administrative solutions to managers of all sorts, it includes practical examples of policies with objectives, targets, and action plans applicable to any process related industry or an ordinary organization. With template formats and hands-on flow charts to describe step-by-step system development, documentation, and implementation ph

  19. Electricity pricing and management systems

    International Nuclear Information System (INIS)

    Sawal, D.M.; Bajapai, Ashok

    1997-01-01

    The installed capacity of power generation in India is at present 80,000 MW. Out of the total 5.79 lakh inhabitated villages in the country, 4.79 villages have been electrified so far. Total number of consumers of electricity are about 95 million in the country. For such a large country with population of over 900 million and area of 32.873 lakh sq. kms., the role of electricity pricing and management system of the power sector is of paramount importance

  20. Learning Management Systems and Comparison of Open Source Learning Management Systems and Proprietary Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Yücel Yılmaz

    2016-04-01

    Full Text Available The concept of learning has been increasingly gaining importance for individuals, businesses and communities in the age of information. On the other hand, developments in information and communication technologies take effect in the field of learning activities. With these technologies, barriers of time and space against the learning activities largely disappear and these technologies make it easier to carry out these activities more effectively. There remain a lot of questions regarding selection of learning management system (LMS to be used for the management of e-learning processes by all organizations conducing educational practices including universities, companies, non-profit organizations, etc. The main questions are as follows: Shall we choose open source LMS or commercial LMS? Can the selected LMS meet existing needs and future potential needs for the organization? What are the possibilities of technical support in the management of LMS? What kind of problems may be experienced in the use of LMS and how can these problems be solved? How much effective can officials in the organization be in the management of LMS? In this study, primarily e-learning and the concept of LMS will be discussed, and in the next section, as for answers to these questions, open source LMSs and centrally developed LMSs will be examined and their advantages and disadvantages relative to each other will be discussed.

  1. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  2. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  3. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  4. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  5. Information management system for KNGR

    International Nuclear Information System (INIS)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie; Park, Jaemoon

    1996-01-01

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III

  6. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  7. Information management system for KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie [Korea Electric Power Corporation, Seoul (Korea, Republic of); Park, Jaemoon [Korea Power Engineering Co., Inc., Daejeon (Korea, Republic of)

    1996-04-15

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III.

  8. Management Systems. Accounting and finance: Public Management

    OpenAIRE

    Martins, J. Albuquerque

    2005-01-01

    Traditionally the differences between the organizations of the public property sector and those of the private one are pointed out. In addition to the classic failures on both of these productive sectors, based on the organizational “500 Maiores e Melhores” operating in Portugal that are divergent in resources, in the present work any substantial differences amongst these sectors’ organizations have been found. Regarding the subject to the models of management, the present study corroborate s...

  9. Challenges and potential improvements in the admission process of patients with spinal cord injury in a specialized rehabilitation clinic - an interview based qualitative study of an interdisciplinary team.

    Science.gov (United States)

    Röthlisberger, Fabian; Boes, Stefan; Rubinelli, Sara; Schmitt, Klaus; Scheel-Sailer, Anke

    2017-06-26

    The admission process of patients to a hospital is the starting point for inpatient services. In order to optimize the quality of the health services provision, one needs a good understanding of the patient admission workflow in a clinic. The aim of this study was to identify challenges and potential improvements in the admission process of spinal cord injury patients at a specialized rehabilitation clinic from the perspective of an interdisciplinary team of health professionals. Semi-structured interviews with eight health professionals (medical doctors, physical therapists, occupational therapists, nurses) at the Swiss Paraplegic Centre (acute and rehabilitation clinic) were conducted based on a maximum variety purposive sampling strategy. The interviews were analyzed using a thematic analysis approach. The interviewees described the challenges and potential improvements in this admission process, focusing on five themes. First, the characteristics of the patient with his/her health condition and personality and his/her family influence different areas in the admission process. Improvements in the exchange of information between the hospital and the patient could speed up and simplify the admission process. In addition, challenges and potential improvements were found concerning the rehabilitation planning, the organization of the admission process and the interdisciplinary work. This study identified five themes of challenges and potential improvements in the admission process of spinal cord injury patients at a specialized rehabilitation clinic. When planning adaptations of process steps in one of the areas, awareness of effects in other fields is necessary. Improved pre-admission information would be a first important step to optimize the admission process. A common IT-system providing an interdisciplinary overview and possibilities for interdisciplinary exchange would support the management of the admission process. Managers of other hospitals can supplement

  10. Microcomputer Database Management Systems for Bibliographic Data.

    Science.gov (United States)

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  11. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  12. Transition Office Management and Accounting System

    Data.gov (United States)

    US Agency for International Development — TOMAS combined over 20 previously separate systems into one fully integrated management system covering budget, finance, procurement, travel, and emergency contact...

  13. Profile of neurological admissions at the University of Nigeria Teaching Hospital Enugu.

    Science.gov (United States)

    Ekenze, O S; Onwuekwe, I O; Ezeala Adikaibe, B A

    2010-01-01

    The burden of Neurological diseases may be on the increase especially in developing countries. Improved outcome in these settings may require appreciation of the spectrum of Neurological diseases and the impediments to their management. We aim to determine the profile of neurological admissions and the challenges of managing these diseases at the University of Nigeria Teaching Hospital Enugu South East Nigeria. Analysis of Neurological admissions into the medical wards of the University of Nigeria Teaching Hospital Enugu from January 2003 to December 2007. Neurological admissions comprise about 14.8% of medical admissions. There were 640 (51%) males and 609 (49%) females. The spectrum of neurological diseases were stroke 64.9%, central nervous system infections (21.8% ), HIV related neurological diseases 3.5%, hypertensive encephalopathy (3.4%), dementia (3%), subarachnoid haemorrhage (2.2%), Guillian Barre syndrome (1.2%), Parkinson's disease (1.1%), myasthenia gravis (1.0%), motor neurone disease and peripheral neuropathy and accounted for 0.8% and 0.6% respectively. Overall, noninfectious disease accounted for 78.2% of neurological admissions while infectious diseases accounted for 11.8%. A wide spectrum of neurological diseases occurs in our setting. The high incidence of CNS infections indicates that efforts should be geared towards preventive measures. A major challenge to be addressed in the management of neurological diseases in our setting is the lack of specialized facilities.

  14. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  15. Designing an oil spill information management system

    International Nuclear Information System (INIS)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R.

    1995-01-01

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning

  16. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  17. FEATURES OF LOGISTIC SYSTEM ADAPTIVE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Natalya VOZNENKO

    2015-08-01

    Full Text Available The study presents literature survey on enterprise logistic system adaptive management place and structure in the general enterprise management system. The theoretical basics of logistic system functioning, levels of its management and its effectiveness had been investigated. The role of adaptive management and its types had been scrutinized. The necessity of creating company’s adaptive regulator such as its economic mechanism had been proved.

  18. The Stress Management in the Enterprise Management System

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-05-01

    Full Text Available The article systematizes the classification of the type of management by a number of attributes: horizon of ambition, priority style of interaction between management and managed systems, level of centralization, orientation, consideration of environmental impact, contents, type of activity, and response to deviation. Within terms of the attribute of response to deviations, place of the stress management is allocated near to the harmonic and the risk management. It has been substantiated that the stress management is the enterprise management system aimed at overcoming unwanted deviations that are significant, extreme, and have a significant negative impact on the operation of enterprise. In the structure of the stress management, the following integral components have been allocated and characterized: crisis, adaptive, reactive, fears, and anticipative.

  19. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  20. Exploring if day and time of admission is associated with average length of stay among inpatients from a tertiary hospital in Singapore: an analytic study based on routine admission data.

    Science.gov (United States)

    Earnest, Arul; Chen, Mark I C; Seow, Eillyne

    2006-01-22

    It has been postulated that patients admitted on weekends or after office hours may experience delays in clinical management and consequently have longer length of stay (LOS). We investigated if day and time of admission is associated with LOS in Tan Tock Seng Hospital (TTSH), a 1,400 bed acute care tertiary hospital serving the central and northern regions of Singapore. This was a historical cohort study based on all admissions from TTSH from 1st September 2003 to 31st August 2004. Data was extracted from routinely available computerized hospital information systems for analysis by episode of care. LOS for each episode of care was log-transformed before analysis, and a multivariate linear regression model was used to study if sex, age group, type of admission, admission source, day of week admitted, admission on a public holiday or eve of public holiday, admission on a weekend and admission time were associated with an increased LOS. In the multivariate analysis, sex, age group, type of admission, source of admission, admission on the eve of public holiday and weekends and time of day admitted were independently and significantly associated with LOS. Patients admitted on Friday, Saturday or Sunday stayed on average 0.3 days longer than those admitted on weekdays, after adjusting for potential confounders; those admitted on the eve of public holidays, and those admitted in the afternoons and after office hours also had a longer LOS (differences of 0.71, 1.14 and 0.65 days respectively). Cases admitted over a weekend, eve of holiday, in the afternoons, and after office hours, do have an increased LOS. Further research is needed to identify processes contributing to the above phenomenon.

  1. Exploring if day and time of admission is associated with average length of stay among inpatients from a tertiary hospital in Singapore: an analytic study based on routine admission data

    Directory of Open Access Journals (Sweden)

    Chen Mark IC

    2006-01-01

    Full Text Available Abstract Background It has been postulated that patients admitted on weekends or after office hours may experience delays in clinical management and consequently have longer length of stay (LOS. We investigated if day and time of admission is associated with LOS in Tan Tock Seng Hospital (TTSH, a 1,400 bed acute care tertiary hospital serving the central and northern regions of Singapore. Methods This was a historical cohort study based on all admissions from TTSH from 1st September 2003 to 31st August 2004. Data was extracted from routinely available computerized hospital information systems for analysis by episode of care. LOS for each episode of care was log-transformed before analysis, and a multivariate linear regression model was used to study if sex, age group, type of admission, admission source, day of week admitted, admission on a public holiday or eve of public holiday, admission on a weekend and admission time were associated with an increased LOS. Results In the multivariate analysis, sex, age group, type of admission, source of admission, admission on the eve of public holiday and weekends and time of day admitted were independently and significantly associated with LOS. Patients admitted on Friday, Saturday or Sunday stayed on average 0.3 days longer than those admitted on weekdays, after adjusting for potential confounders; those admitted on the eve of public holidays, and those admitted in the afternoons and after office hours also had a longer LOS (differences of 0.71, 1.14 and 0.65 days respectively. Conclusion Cases admitted over a weekend, eve of holiday, in the afternoons, and after office hours, do have an increased LOS. Further research is needed to identify processes contributing to the above phenomenon.

  2. Lack of utility of a decision support system to mitigate delays in admission from the operating room to the postanesthesia care unit.

    Science.gov (United States)

    Ehrenfeld, Jesse M; Dexter, Franklin; Rothman, Brian S; Minton, Betty Sue; Johnson, Diane; Sandberg, Warren S; Epstein, Richard H

    2013-12-01

    When the phase I postanesthesia care unit (PACU) is at capacity, completed cases need to be held in the operating room (OR), causing a "PACU delay." Statistical methods based on historical data can optimize PACU staffing to achieve the least possible labor cost at a given service level. A decision support process to alert PACU charge nurses that the PACU is at or near maximum census might be effective in lessening the incidence of delays and reducing over-utilized OR time, but only if alerts are timely (i.e., neither too late nor too early to act upon) and the PACU slot can be cleared quickly. We evaluated the maximum potential benefit of such a system, using assumptions deliberately biased toward showing utility. We extracted 3 years of electronic PACU data from a tertiary care medical center. At this hospital, PACU admissions were limited by neither inadequate PACU staffing nor insufficient PACU beds. We developed a model decision support system that simulated alerts to the PACU charge nurse. PACU census levels were reconstructed from the data at a 1-minute level of resolution and used to evaluate if subsequent delays would have been prevented by such alerts. The model assumed there was always a patient ready for discharge and an available hospital bed. The time from each alert until the maximum census was exceeded ("alert lead time") was determined. Alerts were judged to have utility if the alert lead time fell between various intervals from 15 or 30 minutes to 60, 75, or 90 minutes after triggering. In addition, utility for reducing over-utilized OR time was assessed using the model by determining if 2 patients arrived from 5 to 15 minutes of each other when the PACU census was at 1 patient less than the maximum census. At most, 23% of alerts arrived 30 to 60 minutes prior to the admission that resulted in the PACU exceeding the specified maximum capacity. When the notification window was extended to 15 to 90 minutes, the maximum utility was system to mitigate

  3. Business Management System Support Analysis

    Science.gov (United States)

    Parikh, Jay

    2008-01-01

    The purpose of this research project was to develop a searchable database compiled with internal and external audit findings/observations. The data will correspond to the findings and observations from the date of Center-wide implementation of the ISO 9001-2000 standard to the present (2003-2008). It was derived and extracted from several sources and was in multiple formats. Once extracted, categorization of the findings/observations would be possible. The final data was mapped to the ISO 9001-2000 standard with the understanding that it will be displayed graphically. The data will be used to verify trends, associate risks, and establish timelines to identify strengths and weaknesses to determine areas of improvement in the Kennedy Space Center Business Management System Internal Audit Program.

  4. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  5. Admission Criteria for MBA Programs

    Directory of Open Access Journals (Sweden)

    Silvana Dakduk

    2016-11-01

    Full Text Available This paper reports a review of studies on admission criteria for MBA programs. The method consisted in a literary review based on a systematic search in international databases (Emerald, ABI/INFORM Global, ProQuest Education Journals, ProQuest European Business, ProQuest Science Journal, ProQuest Research Library, ProQuest Psychology Journals, ProQuest Social Science Journals and Business Source Complete of studies published from January 1990 to December 2013, which explore the academic performance of students or graduates of MBA programs. A quantitative review was performed. Results show that most researchers studied relations between GMAT (Graduate Management Admission Test and UGPA (Undergraduate Grade Point Average as predictors of GGPA (Graduate Grade Point Average. On the other hand, work experience and personal traits (such as personality, motivation, learning strategies, self-efficacy beliefs and achievement expectations and their relation with GGPA had been less studied, and results are not consistent enough to consider them valid predictors of student performance at this time.

  6. Derivation and Validation of a Biomarker-Based Clinical Algorithm to Rule Out Sepsis From Noninfectious Systemic Inflammatory Response Syndrome at Emergency Department Admission: A Multicenter Prospective Study.

    Science.gov (United States)

    Mearelli, Filippo; Fiotti, Nicola; Giansante, Carlo; Casarsa, Chiara; Orso, Daniele; De Helmersen, Marco; Altamura, Nicola; Ruscio, Maurizio; Castello, Luigi Mario; Colonetti, Efrem; Marino, Rossella; Barbati, Giulia; Bregnocchi, Andrea; Ronco, Claudio; Lupia, Enrico; Montrucchio, Giuseppe; Muiesan, Maria Lorenza; Di Somma, Salvatore; Avanzi, Gian Carlo; Biolo, Gianni

    2018-05-07

    To derive and validate a predictive algorithm integrating a nomogram-based prediction of the pretest probability of infection with a panel of serum biomarkers, which could robustly differentiate sepsis/septic shock from noninfectious systemic inflammatory response syndrome. Multicenter prospective study. At emergency department admission in five University hospitals. Nine-hundred forty-seven adults in inception cohort and 185 adults in validation cohort. None. A nomogram, including age, Sequential Organ Failure Assessment score, recent antimicrobial therapy, hyperthermia, leukocytosis, and high C-reactive protein values, was built in order to take data from 716 infected patients and 120 patients with noninfectious systemic inflammatory response syndrome to predict pretest probability of infection. Then, the best combination of procalcitonin, soluble phospholypase A2 group IIA, presepsin, soluble interleukin-2 receptor α, and soluble triggering receptor expressed on myeloid cell-1 was applied in order to categorize patients as "likely" or "unlikely" to be infected. The predictive algorithm required only procalcitonin backed up with soluble phospholypase A2 group IIA determined in 29% of the patients to rule out sepsis/septic shock with a negative predictive value of 93%. In a validation cohort of 158 patients, predictive algorithm reached 100% of negative predictive value requiring biomarker measurements in 18% of the population. We have developed and validated a high-performing, reproducible, and parsimonious algorithm to assist emergency department physicians in distinguishing sepsis/septic shock from noninfectious systemic inflammatory response syndrome.

  7. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  8. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  9. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  10. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  11. Managing chronic conditions care across primary care and hospital systems: lessons from an Australian Hospital Avoidance Risk Program using the Flinders Chronic Condition Management Program.

    Science.gov (United States)

    Lawn, Sharon; Zabeen, Sara; Smith, David; Wilson, Ellen; Miller, Cathie; Battersby, Malcolm; Masman, Kevin

    2017-08-24

    Objective The study aimed to determine the impact of the Flinders Chronic Condition Management Program for chronic condition self-management care planning and how to improve its use with Bendigo Health's Hospital Admission Risk Program (HARP). Methods A retrospective analysis of hospital admission data collected by Bendigo Health from July 2012 to September 2013 was undertaken. Length of stay during admission and total contacts post-discharge by hospital staff for 253 patients with 644 admissions were considered as outcome variables. For statistical modelling we used the generalised linear model. Results The combination of the HARP and Flinders Program was able to achieve significant reductions in hospital admissions and non-significant reduction in emergency department presentations and length of stay. The generalised linear model predicted that vulnerable patient groups such as those with heart disease (P=0.037) and complex needs (Pmanage chronic conditions through a greater focus on coordination and integration of care across primary care and hospital systems. In support of HARP, self-management interventions such as the Flinders Program aim to help individuals better manage their medical treatment and cope with the impact of the condition on their physical and mental wellbeing and thus reduce health services utilisation. What does this paper add? This paper sheds light on which patients might be more or less likely to benefit from the combination of the HARP and Flinders Program, with regard to their impact on reductions in hospital admissions, emergency department presentations and length of stay. This study also sheds light on how the Flinders Program could be better targeted towards and implemented among high-need and high-cost patients to lessen chronic disease burden on Australia's health system. What are the implications for practitioners? Programs targeting vulnerable populations and applying evidence-based chronic condition management and self-management

  12. Automated system for individual control for admission of staff in the controlled zones of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Avramski, D.; Jordanova, V.

    2008-01-01

    The development of the system leads to the following: automated registering of the staff in the personnel database; real time reading of the personal dosimeters; real time reading of the collective dose; the control over the working people (especially external) concerning the dose limits or restrictions are performed in real time

  13. Electrofluidic systems for contrast management

    Science.gov (United States)

    Rebello, Keith J.; Maranchi, Jeffrey P.; Tiffany, Jason E.; Brown, Christopher Y.; Maisano, Adam J.; Hagedon, Matthew A.; Heikenfeld, Jason C.

    2012-06-01

    Operating in dynamic lighting conditions and in greatly varying backgrounds is challenging. Current paints and state-ofthe- art passive adaptive coatings (e.g. photochromics) are not suitable for multi- environment situations. A semi-active, low power, skin is needed that can adapt its reflective properties based on the background environment to minimize contrast through the development and incorporation of suitable pigment materials. Electrofluidic skins are a reflective display technology for electronic ink and paper applications. The technology is similar to that in E Ink but makes use of MEMS based microfluidic structures, instead of simple black and white ink microcapsules dispersed in clear oil. Electrofluidic skin's low power operation and fast switching speeds (~20 ms) are an improvement over current state-ofthe- art contrast management technologies. We report on a microfluidic display which utilizes diffuse pigment dispersion inks to change the contrast of the underlying substrate from 5.8% to 100%. Voltage is applied and an electromechanical pressure is used to pull a pigment dispersion based ink from a hydrophobic coated reservoir into a hydrophobic coated surface channel. When no voltage is applied, the Young-Laplace pressure pushes the pigment dispersion ink back down into the reservoir. This allows the pixel to switch from the on and off state by balancing the two pressures. Taking a systems engineering approach from the beginning of development has enabled the technology to be integrated into larger systems.

  14. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  15. Traffic Management Systems Performance Measurement: Final Report

    OpenAIRE

    Banks, James H.; Kelly, Gregory

    1997-01-01

    This report documents a study of performance measurement for Transportation Management Centers (TMCs). Performance measurement requirements were analyzed, data collection and management techniques were investigated, and case study traffic data system improvement plans were prepared for two Caltrans districts.

  16. Trust Management in Open Systems (TMOS)

    National Research Council Canada - National Science Library

    Jones, Vicki

    2002-01-01

    .... The problem considered in the Trust Management in Open Systems (TMOS) project is management of the exchange of sensitive credentials between strangers for the purpose of property-based authentication and authorization...

  17. Managers’ Use of Multiple Management Control Systems

    DEFF Research Database (Denmark)

    Willert, Jeanette

    This dissertation addresses the topic Management Control Systems (MCS) as a Package. Many research studies investigate management and control systems individually, whereas fewer research studies take a holistic view and include a larger part of all the MCS managers use to guide and direct...... subordinates behaviour in the best interest of their companies. In the MCS literature, it is stressed that knowledge is particularly lacking about how managers design and use MCS as a package, and the effectiveness of using the MCS. This dissertation responds to this call by carrying out a large survey among...... executive managers in large companies, a survey that investigates the subject: Effective Management and Control Systems. The focus in the survey is to explore how executive management in large companies design and use their management control systems package. Further, this study is supplemented...

  18. Automated attendance management and alert system | Rahim ...

    African Journals Online (AJOL)

    Automated attendance management and alert system. ... Journal of Fundamental and Applied Sciences ... AAMAS provides various functions, from managing and recording students' attendance record, to sending automatic alerts to students ...

  19. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  20. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  1. Downlink Radio Resource Management for QoS Provisioning in OFDMA Systems

    DEFF Research Database (Denmark)

    Monghal, Guillaume Damien

    Admission Control solution for a realistic OFDMA based system in downlink where LTE is taken as a case study. In the frame of the thesis work, a detailed system model of LTE dedicated to Radio Resource Management study has been developed and implemented in a semi-static system level simulator. In a first...... phase, the study focuses on the dual time / frequency domain packet scheduling concept which allows a linear complexity. Fundamental design principles for throughput control are highlighted. Using those principles, the design of a complete Quality of Service aware packet scheduling algorithm based...

  2. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  3. ISO 55000: Creating an asset management system.

    Science.gov (United States)

    Bradley, Chris; Main, Kevin

    2015-02-01

    In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.

  4. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  5. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2018-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover...... LCA on solid waste systems....

  6. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  7. Radiation management computer system for Monju

    International Nuclear Information System (INIS)

    Aoyama, Kei; Yasutomo, Katsumi; Sudou, Takayuki; Yamashita, Masahiro; Hayata, Kenichi; Ueda, Hajime; Hosokawa, Hideo

    2002-01-01

    Radiation management of nuclear power research institutes, nuclear power stations and other such facilities are strictly managed under Japanese laws and management policies. Recently, the momentous issues of more accurate radiation dose management and increased work efficiency has been discussed. Up to now, Fuji Electric Company has supplied a large number of Radiation Management Systems to nuclear power stations and related nuclear facilities. We introduce the new radiation management computer system with adopted WWW technique for Japan Nuclear Cycle Development Institute, MONJU Fast Breeder Reactor (MONJU). (author)

  8. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  9. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  10. Water management - management actions applied to water resources system

    International Nuclear Information System (INIS)

    Petkovski, Ljupcho; Tanchev, Ljubomir

    2001-01-01

    In this paper are presented a general description of water resource systems, a systematisation of the management tasks and the approaches for solution, including a review of methods used for solution of water management tasks and the fundamental postulates in the management. The management of water resources is a synonym for the management actions applied to water resource systems. It is a general term that unites planning and exploitation of the systems. The modern planning assumes separating the water racecourse part from the hydro technical part of the project. The water resource study is concerned with the solution for the resource problem. This means the parameters of the system are determined in parallel with the definition of the water utilisation regime. The hydro-technical part of the project is the design of structures necessary for the water resource solution. (Original)

  11. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  12. An operation management system for golf tournament

    Directory of Open Access Journals (Sweden)

    Yuan Yijun

    2017-02-01

    Full Text Available In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful for reducing management costs and improving efficiency of tournament management company.

  13. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  14. Performance Enhancements for Advanced Database Management Systems

    OpenAIRE

    Helmer, Sven

    2000-01-01

    New applications have emerged, demanding database management systems with enhanced functionality. However, high performance is a necessary precondition for the acceptance of such systems by end users. In this context we developed, implemented, and tested algorithms and index structures for improving the performance of advanced database management systems. We focused on index structures and join algorithms for set-valued attributes.

  15. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  16. Adopting Clinical Guidelines for Admission Criteria of Intensive Care Unit: A Measure to Manage Queues of Patients Waiting for This Section

    Directory of Open Access Journals (Sweden)

    Afshin Mohammad Alizadeh

    2018-04-01

    Full Text Available Background: Due to the need of patients to the intensive care unit (ICU for receiving medical and nursing services, these services should be provided in a timely manner. This study aimed to develop the clinical guidelines for admission criteria of intensive care unit.Materials and Methods: This study was observational type study was conducted for nine months in 2015 based on a three-step process of adoption of clinical guidelines including planning, adoption and finalization. After conducting systematic searches, the quality of retrieved clinical guidelines was evaluated by experts from policy makers in the admission of patients in the ICU. Finally, the ultimate version of the guideline was developed after reviewing and organizing expert panel sessions.Results: The criteria for accepting patients were presented in form of seven clauses based on the neurological status, cardiovascular status, respiratory status, water and electrolyte disorders, gastrointestinal disturbances, endocrine disorders, surgery and postoperative care.Conclusion: One of the most important factors of creating demand inducing to the patients is the lack of clinical guidelines. It is recommended that departmental doctors should apply the mentioned clinical guidelines in order to make the resources of the intensive care unit more effective.

  17. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  18. An operation management system for golf tournament

    OpenAIRE

    Yuan Yijun; Luo Hanwen

    2017-01-01

    In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful...

  19. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-05-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system as potential replacements namely: Proquest 360 Resource Manager, Ex Libris Alma and Open Source CORAL ERMS. After comparing and trialling the systems, it was decided to go for Proquest 360 Resource Manager.

  20. Destination Information Management System for Tourist

    OpenAIRE

    Abdulhamid, Shafii Muhammad; Usman, Gana

    2014-01-01

    The use of information and communication technology in our day to day activities is now unavoidable. In tourism developments, destination information and management systems are used to guide visitors and provide information to both visitors and management of the tour sites. In this paper, information and navigation system was designed for tourists, taking some Niger state of Nigeria tourism destinations into account. The information management system was designed using Java Applet (NetBeans I...

  1. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  2. Management system, organizational climate and performance relationships

    Science.gov (United States)

    Davis, B. D.

    1979-01-01

    Seven aerospace firms were investigated to determine if a relationship existed among management systems, organizational climate, and organization performance. Positive relationships were found between each of these variables, but a statistically significant relationship existed only between the management system and organizational climate. The direction and amount of communication and the degree of decentralized decision-making, elements of the management system, also had a statistically significant realtionship with organization performance.

  3. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  4. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  5. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  6. University Program Management Information System

    Science.gov (United States)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  7. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  8. Structure preserving transformations for Newtonian Lie-admissible equations

    International Nuclear Information System (INIS)

    Cantrijn, F.

    1979-01-01

    Recently, a new formulation of non-conservative mechanics has been presented in terms of Hamilton-admissible equations which constitute a generalization of the conventional Hamilton equations. The algebraic structure entering the Hamilton-admissible description of a non-conservative system is that of a Lie-admissible algebra. The corresponding geometrical treatment is related to the existence of a so-called symplectic-admissible form. The transformation theory for Hamilton-admissible systems is currently investigated. The purpose of this paper is to describe one aspect of this theory by identifying the class of transformations which preserve the structure of Hamilton-admissible equations. Necessary and sufficient conditions are established for a transformation to be structure preserving. Some particular cases are discussed and an example is worked out

  9. Sustainable Soil Water Management Systems

    OpenAIRE

    Basch, G.; Kassam, A.; Friedrich, T.; Santos, F.L.; Gubiani, P.I.; Calegari, A.; Reichert, J.M.; dos Santos, D.R.

    2012-01-01

    Soil quality and its management must be considered as key elements for an effective management of water resources, given that the hydrological cycle and land management are intimately linked (Bossio et al. 2007). Soil degradation has been described by Bossio et al. (2010) as the starting point of a negative cycle of soil-water relationships, creating a positive, self-accelerating feedback loop with important negative impacts on water cycling and water productivity. Therefore, sustainable soil...

  10. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  11. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  12. Information Systems Coordinate Emergency Management

    Science.gov (United States)

    2012-01-01

    -changing planet. This information can be captured, analyzed, and visualized by geographic information systems (GIS) to produce maps, charts, and other tools that can reveal information essential to a wide variety of applications including emergency management. Knowing precise, real-time information about the size, location, environmental conditions, and resulting damage of an event like a flood or wildfire as well as the location and numbers of emergency responders and other resources contributes directly to the effectiveness of disaster mitigation. The need for such information is also evident when responding to homeland security threats, such as a terrorist attack. Recognizing the value of its geospatial information resources for this and other purposes, in 1998 Stennis and the state of Mississippi partnered to form what became the Enterprise for Innovative Geospatial Solutions (EIGS) industry cluster, supporting the growth of remote sensing and GIS-based research and business. As part of EIGS, several companies partnered with NASA through dual use and Small Business Innovation Research (SBIR) contracts. Among those was NVision.

  13. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  14. ORGANIZATIONAL THEORY, SYSTEMIC THINKING AND SYSTEM MANAGEMENT

    OpenAIRE

    Shahram Mirzaie Daryani; Samad Aali; Ahmad Asli-zadeh

    2012-01-01

    Organizational theory offers effective ways of thinking to researchers and practitioners who are interested in this field of study. This knowledge helps managers make organizational behavior more efficient through analyzing complex situations and developing effective tools to resolve them. In other words, it opens human’s mind to different aspects of life both inside and outside of the organization. Therefore, the value of organizational theory is in changing managers' thinking ways, thought ...

  15. Assessing the economic value of avoiding hospital admissions by shifting the management of gram+ acute bacterial skin and skin-structure infections to an outpatient care setting.

    Science.gov (United States)

    Ektare, V; Khachatryan, A; Xue, M; Dunne, M; Johnson, K; Stephens, J

    2015-01-01

    To estimate, from a US payer perspective, the cost offsets of treating gram positive acute bacterial skin and skin-structure infections (ABSSSI) with varied hospital length of stay (LOS) followed by outpatient care, as well as the cost implications of avoiding hospital admission. Economic drivers of care were estimated using a literature-based economic model incorporating inpatient and outpatient components. The model incorporated equal efficacy, adverse events (AE), resource use, and costs from literature. Costs of once- and twice-daily outpatient infusions to achieve a 14-day treatment were analyzed. Sensitivity analyses were performed. Costs were adjusted to 2015 US$. Total non-drug medical cost for treatment of ABSSSI entirely in the outpatient setting to avoid hospital admission was the lowest among all scenarios and ranged from $4039-$4924. Total non-drug cost for ABSSSI treated in the inpatient setting ranged from $9813 (3 days LOS) to $18,014 (7 days LOS). Inpatient vs outpatient cost breakdown was: 3 days inpatient ($6657)/11 days outpatient ($3156-$3877); 7 days inpatient ($15,017)/7 days outpatient ($2495-$2997). Sensitivity analyses revealed a key outpatient cost driver to be peripherally inserted central catheter (PICC) costs (average per patient cost of $873 for placement and $205 for complications). Drug and indirect costs were excluded and resource use was not differentiated by ABSSSI type. It was assumed that successful ABSSSI treatment takes up to 14 days per the product labels, and that once-daily and twice-daily antibiotics have equal efficacy. Shifting ABSSSI care to outpatient settings may result in medical cost savings greater than 53%. Typical outpatient scenarios represent 14-37% of total medical cost, with PICC accounting for 28-43% of the outpatient burden. The value of new ABSSSI therapies will be driven by eliminating the need for PICC line, reducing length of stay and the ability to completely avoid a hospital stay.

  16. Waste Management Information System (WMIS) User Guide

    International Nuclear Information System (INIS)

    Broz, R.E.

    2008-01-01

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data through the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal

  17. Waste Management Information System (WMIS) User Guide

    Energy Technology Data Exchange (ETDEWEB)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  18. System safety education focused on system management

    Science.gov (United States)

    Grose, V. L.

    1971-01-01

    System safety is defined and characteristics of the system are outlined. Some of the principle characteristics include role of humans in hazard analysis, clear language for input and output, system interdependence, self containment, and parallel analysis of elements.

  19. FORMATION OF THE ENTERPRISE COSTS MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Borysiuk Iryna

    2018-01-01

    Full Text Available Introduction. The paper deals with the actual issues of formation of the enterprise management system costs, because in the conditions of an unstable market environment the financial performance depends on the efficiency of the cost management system, competitiveness, financial sustainability and investment attractiveness of any subject of economic activity. Purpose of the article is consolidation of approaches to cost management, theoretical substantiation and development of recommendations regarding the formation of the enterprise cost management system. Results. Development of an enterprise cost management system based on research on the essence and cost management approaches. The goals, tasks, principles, methods, tools, functions and main elements of the cost management system were determined, factors of the external and internal environment of the enterprise, that affect the system of its costs management. Conclusions. Formation of integrated cost management system ensures the successful company operation on the market, production of competitive products based on costs and prices optimization and making a profit, increase of the reasonableness of making managerial decisions.

  20. Marine biological data and information management system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.

    Indian National Oceanographic Data Centre (INODC) is engaged in developing a marine biological data and information management system (BIODIMS). This system will contain the information on zooplankton in the water column, zoobenthic biomass...

  1. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-01-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system

  2. Descriptions of Transit Maintenance Management Information Systems

    Science.gov (United States)

    1984-10-01

    This 289-page report presents an overview of ten maintenance management information systems that are currently operational or near-operational on minicomputers or microcomputers. The systems described address one or more of the following concerns: co...

  3. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  4. The PDS4 Metadata Management System

    Science.gov (United States)

    Raugh, A. C.; Hughes, J. S.

    2018-04-01

    We present the key features of the Planetary Data System (PDS) PDS4 Information Model as an extendable metadata management system for planetary metadata related to data structure, analysis/interpretation, and provenance.

  5. Software for Intelligent System Health Management

    Science.gov (United States)

    Trevino, Luis C.

    2004-01-01

    This viewgraph presentation describes the characteristics and advantages of autonomy and artificial intelligence in systems health monitoring. The presentation lists technologies relevant to Intelligent System Health Management (ISHM), and some potential applications.

  6. A Blood Bank Information Management System

    Science.gov (United States)

    Farmer, James J.

    1982-01-01

    A computerized Blood Bank Management system is described. Features include product oriented data input, inventory control reports, product utilization reports, rapid retrieval of individual patient reports. Relative benefits of the system are discussed.

  7. Planning for impact management: a systems perspective

    International Nuclear Information System (INIS)

    Leistritz, F.L.; Halstead, J.M.; Chase, R.A.; Murdock, S.H.

    1983-01-01

    The authors develop a conceptual basis for viewing impact events and their subsequent management, and thus for designing impact management programs. Following an examination of the pragmatic rationales for an impact management program for large-scale projects, such as a nuclear waste repository, they discuss the interrelated nature of impact events that clarify the need for an integrated systems-orientated socioeconomic impact management framework. They then present the key components of such a system and discusss its implementation. Although a concerted systems approach is difficult to implement and is complex in design, it will be more difficult to complete the repository siting process without one. 4 tables

  8. Energy Management of Smart Distribution Systems

    Science.gov (United States)

    Ansari, Bananeh

    Electric power distribution systems interface the end-users of electricity with the power grid. Traditional distribution systems are operated in a centralized fashion with the distribution system owner or operator being the only decision maker. The management and control architecture of distribution systems needs to gradually transform to accommodate the emerging smart grid technologies, distributed energy resources, and active electricity end-users or prosumers. The content of this document concerns with developing multi-task multi-objective energy management schemes for: 1) commercial/large residential prosumers, and 2) distribution system operator of a smart distribution system. The first part of this document describes a method of distributed energy management of multiple commercial/ large residential prosumers. These prosumers not only consume electricity, but also generate electricity using their roof-top solar photovoltaics systems. When photovoltaics generation is larger than local consumption, excess electricity will be fed into the distribution system, creating a voltage rise along the feeder. Distribution system operator cannot tolerate a significant voltage rise. ES can help the prosumers manage their electricity exchanges with the distribution system such that minimal voltage fluctuation occurs. The proposed distributed energy management scheme sizes and schedules each prosumer's ES to reduce the electricity bill and mitigate voltage rise along the feeder. The second part of this document focuses on emergency energy management and resilience assessment of a distribution system. The developed emergency energy management system uses available resources and redundancy to restore the distribution system's functionality fully or partially. The success of the restoration maneuver depends on how resilient the distribution system is. Engineering resilience terminology is used to evaluate the resilience of distribution system. The proposed emergency energy

  9. Introduction to data base management systems

    International Nuclear Information System (INIS)

    Rossiter, B.N.

    1984-01-01

    Data base management systems offer considerable advantages over elementary filing systems under favourable circumstances such as where data structures and applications are continually changing. The architecture of such systems and the manner in which they work is described, with particular attention to data independence. An introduction is made to the classification of data base management systems by the data structuring models that they employ. (orig.)

  10. Reexamining Operating System Support for Database Management

    OpenAIRE

    Vasil, Tim

    2003-01-01

    In 1981, Michael Stonebraker [21] observed that database management systems written for commodity operating systems could not effectively take advantage of key operating system services, such as buffer pool management and process scheduling, due to expensive overhead and lack of customizability. The “not quite right” fit between these kernel services and the demands of database systems forced database designers to work around such limitations or re-implement some kernel functionality in user ...

  11. Safety Management System in Croatia Control Ltd.

    OpenAIRE

    Pavlin, Stanislav; Sorić, Vedran; Bilać, Dragan; Dimnik, Igor; Galić, Daniel

    2009-01-01

    International Civil Aviation Organization and other international aviation organizations regulate the safety in civil aviation. In the recent years the International Civil Aviation Organization has introduced the concept of the safety management system through several documents among which the most important is the 2006 Safety Management Manual. It treats the safety management system in all the segments of civil aviation, from carriers, aerodromes and air traffic control to design, constructi...

  12. Region 7 Laboratory Information Management System

    Science.gov (United States)

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  13. Existence crises of actual financial management systems

    OpenAIRE

    SVASTA Mihai

    2009-01-01

    The present financial management systems reflects only partially the economic reality and they are no longer able to act as an instrument for the management. It is absurd that an economy populated by business models based on 21st century technology to use financial management systems based mainly on the same principles formalised by Luca Paciolli in 1494. Therefore, one of the causes of the current economic crisis could be the lack of coordination between the evolution of the business models ...

  14. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  15. Treatment system operation, management, and finance

    Energy Technology Data Exchange (ETDEWEB)

    Truax, D.D. (Mississippi State Univ., Mississippi State (United States))

    1990-06-01

    This article deals with literature on operation, management, and financing of wastewater treatment plants. Some topics discussed are system hydraulics and flow monitoring, odor, reliability, equipment age, management philosophy, performance, reducing operating cost, planning and response to emergencies, preventative maintenance, inspection systems, mechanical vibrations, safety, privatization, municipal leasing, user and impact fees.

  16. Disconnect Between Public Sector Management System and ...

    African Journals Online (AJOL)

    three regional governments, this article exposes how public sector management system (public finance and human resource management system) determines decentralization outcomes. It contends that outcomes of decentralization reforms are shaped not only by political and economic factors, as suggested in the ...

  17. Assessment of laboratory logistics management information system ...

    African Journals Online (AJOL)

    Introduction: Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. Methods: ...

  18. INDUSTRIAL ENTERPRISE MANAGEMENT SYSTEM QUALITY ASSESMENT

    Directory of Open Access Journals (Sweden)

    S. V. Pankov

    2012-01-01

    Full Text Available Management systems of small-scale enterprises in Moscow region are of centralized linear type. Misunderstanding of the need for qualitymanagement operational processes is observed in such business structures. Using correct management systems results in reduction of business costs and increase of business economic efficiency and entrepreneurship social role.

  19. Public Management Information Systems: Theory and Prescription.

    Science.gov (United States)

    Bozeman, Barry; Bretschneider, Stuart

    1986-01-01

    The existing theoretical framework for research in management information systems (MIS) is criticized for its lack of attention to the external environment of organizations, and a new framework is developed which better accommodates MIS in public organizations: public management information systems. Four models of publicness that reflect external…

  20. Environmental management systems in South Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla

    2004-01-01

    The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa.......The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa....

  1. Knowledge Management System Model for Learning Organisations

    Science.gov (United States)

    Amin, Yousif; Monamad, Roshayu

    2017-01-01

    Based on the literature of knowledge management (KM), this paper reports on the progress of developing a new knowledge management system (KMS) model with components architecture that are distributed over the widely-recognised socio-technical system (STS) aspects to guide developers for selecting the most applicable components to support their KM…

  2. Career management in the healthcare system

    OpenAIRE

    Pusa Tania Tapliga; Roxana Nicoleta Matei

    2014-01-01

    Career management is a specialized activity that provides the relation between HRM and the individual and organizational career planning. The health system is changing, more than any other field. Career Management in the health care system involves a complex process of analysis and human resource planning at both the organizational and the individual level.

  3. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  4. ITS data management system : year one activities

    Science.gov (United States)

    1997-08-01

    This report documents research conducted in the development of an ITS data management system, hereafter referred to as ITS DataLink. The objective of the ITS DataLink system is to retain, manage, share, and analyze ITS data for a variety of tra...

  5. African Traditional Knowledge Systems and Biodiversity Management

    African Journals Online (AJOL)

    There is a link between African Traditional Knowledge Systems and the management of Biodiversity. These have been passed over from one generation to the next through oral tradition. The lack of documentation of these systems of managing biodiversity has led to the existence of a gap between the scientifi cally based ...

  6. Social responsibility as a management system

    Directory of Open Access Journals (Sweden)

    Nuria Arimany-Serrat

    2018-02-01

    Originality/value: The study identifies a business management system that continuously organises and improves the performances of a company in the area of Corporate Social Responsibility, through audited certification that enhances the competitivity of companies that hold the international standard. The study also demonstrates the need for a management system to integrate into business models.

  7. The LHCb Data Management System

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    We shall describe all the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behaviour of LHCb Storage capacity.

  8. Nonflexible Lie-admissible algebras

    International Nuclear Information System (INIS)

    Myung, H.C.

    1978-01-01

    We discuss the structure of Lie-admissible algebras which are defined by nonflexible identities. These algebras largely arise from the antiflexible algebras, 2-varieties and associator dependent algebras. The nonflexible Lie-admissible algebras in our discussion are in essence byproducts of the study of nonassociative algebras defined by identities of degree 3. The main purpose is to discuss the classification of simple Lie-admissible algebras of nonflexible type

  9. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  10. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  11. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  12. Municipal solid waste management system: decision support through systems analysis

    OpenAIRE

    Pires, Ana Lúcia Lourenço

    2010-01-01

    Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia for the degree of Doctor of Philosophy in Environmental Engineering The present study intends to show the development of systems analysis model applied to solid waste management system, applied into AMARSUL, a solid waste management system responsible for the management of municipal solid waste produced in Setúbal peninsula, Portugal. The model developed intended to promote sustainable decision making, ...

  13. Management system requirements for small reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K.A., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2013-07-01

    This abstract identifies the management system requirements for the life cycle of small reactors from initial conception through completion of decommissioning. For small reactors, the requirements for management systems remain the same as those for 'large' reactors regardless of the licensee' business model and objectives. The CSA N-Series of standards provides an interlinked set of requirements for the management of nuclear facilities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while other CSA nuclear standards provide technical requirements and guidance that support the management system. CSA N286 is based on a set of principles. The principles are then supported by generic requirements that are applicable to the life cycle of nuclear facilities. CNSC regulatory documents provide further technical requirements and guidance. (author)

  14. Sequencing Information Management System (SIMS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fields, C.

    1996-02-15

    A feasibility study to develop a requirements analysis and functional specification for a data management system for large-scale DNA sequencing laboratories resulted in a functional specification for a Sequencing Information Management System (SIMS). This document reports the results of this feasibility study, and includes a functional specification for a SIMS relational schema. The SIMS is an integrated information management system that supports data acquisition, management, analysis, and distribution for DNA sequencing laboratories. The SIMS provides ad hoc query access to information on the sequencing process and its results, and partially automates the transfer of data between laboratory instruments, analysis programs, technical personnel, and managers. The SIMS user interfaces are designed for use by laboratory technicians, laboratory managers, and scientists. The SIMS is designed to run in a heterogeneous, multiplatform environment in a client/server mode. The SIMS communicates with external computational and data resources via the internet.

  15. Nova laser assurance-management system

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Nova assurance management system was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management system. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  16. Admission predictability of children with acute asthma

    Directory of Open Access Journals (Sweden)

    Maan Alherbish

    2018-01-01

    CONCLUSIONS: Decision of admission could be made to many children with moderate-to-severe acute asthma at the 2nd h of ED stay based on their total PAS. OS and RR should be part of any scoring system to evaluate acute asthma in children.

  17. Test-Based Admission to Selective Universities:

    DEFF Research Database (Denmark)

    Thomsen, Jens-Peter

    2016-01-01

    This article examines whether the existence of a secondary higher education admission system honouring more qualitative and extra-curricular merits has reduced the social class gap in access to highly sought-after university programmes in Denmark. I use administrative data to examine differences...

  18. Perceptions of veterinary admissions committee members of ...

    African Journals Online (AJOL)

    Veterinary admission committees are asked to create and implement a fair, reliable, and valid system to select the candidates most likely to succeed in veterinary school from a large pool of applicants. Although numerous studies have explored grade point average (GPA) as a predictive value of later academic success, ...

  19. Expert Systems for auditing management information systems

    Directory of Open Access Journals (Sweden)

    Gheroghe Popescu

    2007-05-01

    Full Text Available Expert systems are built with the help of: specialised programming languages or expert system generators (shell. But this structure was reached after tens of years of work and research, because expert systems are nothing but pragmatic capitalisation of the results of research carried out in artificial intelligence and theory of knowledge.

  20. Fims, forestry information management system: An overview

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This geographic information system has been developed as part of Forestry Canada's Eastern Quebec Forestry Program for woodlot owners in eastern Quebec. The goal was to provide private woodlot operators with a management system that uses the most advanced technology available. This booklet provides an overview of this system, explaining how the system can be used.

  1. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  2. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  3. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  4. Manager's assistant systems for space system planning

    Science.gov (United States)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  5. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  6. Environmental management systems and organizational change

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg

    2000-01-01

    and environmental management systems. The structure of the organizations has changed, the relationships with external partners have strengthened and the implementation of quality and environmental management systems has trimmed the organizations to manage and develop these areas. The organization analysis is based......The establishment of an environmental management system and its continuous improvements is a process towards a reduction of the companies' and the products' environmental impact. The organizations' ability to change is crucial in order to establish a dynamic environmental management system...... and to achieve continuous environmental improvements. The study of changes gives an insight into how organizations function, as well as their forces and barriers. This article focuses on the organizational changes that two companies have undergone from 1992 up until today in connection with their quality...

  7. Five paradox on energy system management

    International Nuclear Information System (INIS)

    Frisch, J.R.

    1995-01-01

    Five paradox are detailed on energy management: internationalization of energy questions but always regional management is present, short term problems must be solved but without forgetting long term problems in environment, the third paradox is : we have time but we are in a hurry, we have reserves but ten, twenty or thirty years are necessary to adapt our energy system; the fourth paradox is : we cannot manage energy by managing only energy, for example : finances system development and environment importance. The last and fifth paradox is : the market, yes, but state too, as regulative force

  8. 1995 Baseline solid waste management system description

    International Nuclear Information System (INIS)

    Anderson, G.S.; Konynenbelt, H.S.

    1995-09-01

    This provides a detailed solid waste system description that documents the treatment, storage, and disposal (TSD) strategy for managing Hanford's solid low-level waste, low-level mixed waste, transuranic and transuranic mixed waste, and greater-than-Class III waste. This system description is intended for use by managers of the solid waste program, facility and system planners, as well as system modelers. The system description identifies the TSD facilities that constitute the solid waste system and defines these facilities' interfaces, schedules, and capacities. It also provides the strategy for treating each of the waste streams generated or received by the Hanford Site from generation or receipt through final destination

  9. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  10. Wheel speed management control system for spacecraft

    Science.gov (United States)

    Goodzeit, Neil E. (Inventor); Linder, David M. (Inventor)

    1991-01-01

    A spacecraft attitude control system uses at least four reaction wheels. In order to minimize reaction wheel speed and therefore power, a wheel speed management system is provided. The management system monitors the wheel speeds and generates a wheel speed error vector. The error vector is integrated, and the error vector and its integral are combined to form a correction vector. The correction vector is summed with the attitude control torque command signals for driving the reaction wheels.

  11. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  12. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  13. QUALITY MANAGEMENT IN BANKING SYSTEM

    Directory of Open Access Journals (Sweden)

    Micuda Ion Dan

    2009-05-01

    Full Text Available Quality management banking perspective is extremely interesting, from the point of view of the activities specific, and of the permanent area competition improvement. Banks being aware of the quality problems also lead to the appearance and requirement of

  14. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  15. Learning Management Systems: Are They Knowledge Management Tools?

    Directory of Open Access Journals (Sweden)

    Bayan Aref Abu Shawar

    2010-03-01

    Full Text Available The new adventure of online world has helped to improve many domains and sectors. Knowledge management era which originally related to business sector is now required in industry, health, or any institute that needs to manage its knowledge. Education is no exception! The advancement in computers speed and memory, and the growth of Internet usage are behind the inspiration of e-learning approach. In which the computer is used as a medium to deliver and share educational materials and knowledge instead of face-to-face tutoring. This makes education available to any one, any place, and any time as learner need. This paper presents the relationship between knowledge management and learning management system (LMS that is used in e-learning paradigms. A detailed description of the LMS used at Arab Open University (AOU is included in this paper. We claim that the LMS used at AOU can be considered as a knowledge management tool.

  16. An information model of a centralized admission campaign in ...

    African Journals Online (AJOL)

    The aim of the work is to structure individual application environments of the information model of a centralized admission campaign in higher education institutions in Russia by modifying the corresponding structure of the Federal information system supporting state final examination and admission procedures. , The ...

  17. A Survey of International Practice in University Admissions Testing

    Science.gov (United States)

    Edwards, Daniel; Coates, Hamish; Friedman, Tim

    2012-01-01

    This paper explores how admissions tests are used in different higher education systems around the world. This is a relatively new area of research, despite the fact that admissions processes are a key component of university practices and given the ever increasing globalisation of higher education. This paper shows that aptitude and achievement…

  18. Searching your site's management information systems

    International Nuclear Information System (INIS)

    Marquez, W.; Rollin, C.

    1994-01-01

    The Department of Energy's guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort

  19. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  20. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system