WorldWideScience

Sample records for administration contractor performance

  1. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  2. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  3. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  4. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  5. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  6. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  7. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  8. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  9. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  10. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  11. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

    Science.gov (United States)

    2014-08-01

    State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...

  12. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  13. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  14. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  15. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  16. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief

    Science.gov (United States)

    2014-01-01

    State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation dep...

  17. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  18. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  19. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  20. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  1. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  2. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  3. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  4. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  5. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  6. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  7. 78 FR 37670 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Science.gov (United States)

    2013-06-21

    ...: Mr. Michael O. Jackson, Procurement Analyst, at 202-208-4949, for clarification of content. For... Administrator for Federal Procurement Policy makes a written determination that it would not be in the best..., Contractor Code of Business Ethics and Conduct, in the definition of ``full cooperation''. The Councils...

  8. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  9. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  10. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  11. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  12. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2009-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and provides the contractor with sufficient risk reward...

  13. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2008-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and to provide the contractor with sufficient risk reward...

  14. Operator/contractor teamwork is the key to performance improvement

    International Nuclear Information System (INIS)

    Robins, K.B.; Roberts, J.D.M.

    1996-01-01

    The contract strategies developed by the two major E and P companies operating in the North Sea emphasize teamwork between operator and contractors to achieve the common goal of maximizing project value. These strategies have had significant repercussions across the whole industry. This paper compares these strategies and concludes that although they are structurally different, they have the same fundamental objectives. It describes the evolution of what these operators consider to be their core business, with the resultant changing roles for both operator and contractor staff. Several examples of results achieved through implementing these changes are described, highlighting the need for a structured performance measurement system to quantify the success of these initiatives. Finally, the potential for even greater efficiency improvements through further industry-wide cooperation is emphasized

  15. 48 CFR 52.236-1 - Performance of Work by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Performance of Work by the....236-1 Performance of Work by the Contractor. As prescribed in 36.501(b), insert the following clause... the work and customary or necessary specialty subcontracting (see 36.501(a)).] Performance of Work by...

  16. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    Science.gov (United States)

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  17. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  18. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  19. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  20. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  1. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  2. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Review and correction of... contractors' property control systems. When the Government's property administrator determines that review and... administrator must review the system to determine whether the contractor will be able to meet the requirements...

  3. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  4. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  5. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  6. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  7. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Science.gov (United States)

    2013-08-07

    ....regulations.gov , including any personal and/or business confidential information provided. FOR FURTHER... equivalent of ``providing'' the past performance evaluation to the contractor, and it starts the suspense... explanations included, available to source selection officials within 14 days will be to the advantage of most...

  8. Perceptions of success in performance-based procurement: Differences between clients and contractors

    NARCIS (Netherlands)

    van Duren, J.M.A.; Doree, Andries G.; Voordijk, Johannes T.

    2015-01-01

    Purpose – The purpose of this study is to analyse, from the perspective of agency theory, differences between client and contractor in their perceptions of changes in uncertainty and in inclination to opportunistic behaviour while using a performance-based procurement procedure. In agency theory,

  9. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  10. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  11. Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of Concept

    Science.gov (United States)

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Big Data Analysis of Contractor Performance Information for Services...Director, Acquisition Career Management, ASN(RD&A) Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of...oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 398 - Big Data Analysis of Contractor Performance Information for Services Acquisition in

  12. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  13. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  14. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  15. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  16. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  17. Health and Safety Guide for Home Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  18. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  19. Certification of ERDA contractors' packaging with respect to compliance with DOT specification 7A performance requirements

    International Nuclear Information System (INIS)

    Edling, D.A.; Griffin, J.F.

    1975-01-01

    The purpose of this study was to have one ERDA contractor: (1) compile a list of specification packagings, proposed by ERDA contractors, for shipping Type A quantities of radioactive material, and (2) analyze these packages for conformance to Specification 7A requirements. This study was divided into two phases. Phase I provides a report on those packages which could be shown, based on existing test data and engineering analyses, to conform to DOT Specification 7A packaging requirements. The results of Phase I are discussed in detail in the publication, ''Certification of AEC Contractor's Packagings With Respect to Compliance with DOT Specification 7A Performance Requirements -- Phase I Summary Report,'' D. A. Edling, H. E. Meyer and G. L. Phillabaum (Schedule 189C, May 26, 1974). The objectives of Phase II were: (1) identification of packages from Phase I for which available information was not adequate for certification. (Those specification containers used by ERDA contractors and those containers for which adequate information was available for certification are listed in the Phase I summary report.); (2) identification of specific test/engineering analysis data required; (3) generation/procurement of these data; and (4) documentation of study results for use by all ERDA contractors and private industry. The results of Phase II of the study are presented. (U.S.)

  20. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  1. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was..., Washington, DC 20405. Please cite OMB Control No. 9000-0132, Contractors' Purchasing Systems Review, in all...

  2. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    .... The essence of the definition cannot be changed substantially in the DFARS from that in the... recommended that the final rule define the contractor's obligation to cooperate, as in the mandatory... define the scope and limitations of the contractor's obligation to cooperate with Government...

  3. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  4. 48 CFR 32.1007 - Administration and payment of performance-based payments.

    Science.gov (United States)

    2010-10-01

    ... contractor's experience, performance record, reliability, financial strength, and the adequacy of controls... of performance-based payments. 32.1007 Section 32.1007 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 32.1007...

  5. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  6. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  7. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  8. 77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2012-09-06

    ....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...

  9. 41 CFR 109-1.5204 - Review and approval of a designated contractor's personal property management system.

    Science.gov (United States)

    2010-07-01

    ... property management system. (a) An initial review of a designated contractor's personal property management... follow-on contract. The purpose of the review is to determine whether the contractor's system provides... by the property administrator that all major system deficiencies identified in the review or...

  10. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  11. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  12. 48 CFR 242.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ...) Contractor estimating systems (see FAR 15.407-5); and (B) Contractor material management and accounting... report identifying significant accounting system or related internal control deficiencies. (9) For... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract...

  13. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  14. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  15. Hanford Site Welding Program Successfully Providing A Single Site Function For Use By Multiple Contractors

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2009-01-01

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  16. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  17. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  18. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  19. 77 FR 11355 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Science.gov (United States)

    2012-02-24

    ...D published an initial proposed rule for Business Systems-- Definition and Administration (DFARS... the definition and administration of contractor business systems as follows: A. Contractor business..., 245, and 252 RIN 0750-AG58 Defense Federal Acquisition Regulation Supplement; Business Systems...

  20. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  1. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  2. 23 CFR Appendix C to Subpart A of... - Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) C Appendix C to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Part 230—Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) EC14OC91.000 ...

  3. Performance Analysis of the Romanian Administration

    Directory of Open Access Journals (Sweden)

    Marius Constantin PROFIROIU

    2013-10-01

    Full Text Available The performance of public administration is one of the top priorities of the national governments worldwide, not only for Romania. The role of a performing management system at the level of public administration is to ensure a high quality and efficiency of the adopted policies and strategies, of the provided public services and of the administrative act itself, and to guarantee the advantage of a competitive and efficient administration both in relation to its own citizens, and in competition with other cities and countries throughout Europe and all around the world. Following these considerations, and based upon an empirical research conducted with the aid of a survey regarding ‘The analysis of the performance level of the Romanian public administration’ the article aims to (1 identify modern management tools that determine and influence the performance of Romanian public institutions, (2 analyze the effects of using project management as organizational capacity development instruments by public administration in Romania, and (3 determine the influence and effects of the external factors on the performance and development of Romanian public administration.

  4. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  5. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  6. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  7. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  8. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  9. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  10. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  11. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  12. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  13. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  14. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  15. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  16. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  17. Report to Congress on the Indemnification of Contractors Performing Environmental Restoration

    Science.gov (United States)

    1993-11-01

    strategies have C-0 irwo-enal contracting experience within the Ibm aple in protecting assets hrm CERCLA ! components and the question of what role, if...federal Crawford v. National Lead Co.40 is another government owns tens of thousands of automobiles ; example of a failed government contractor defense

  18. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  19. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  20. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Science.gov (United States)

    2011-05-12

    ...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for... Conflicts of Interest for Contractor Employees Performing Acquisition Functions by any of the following...

  1. 48 CFR 42.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Office Functions 42... officer. (5) Negotiate forward pricing rate agreements (see 15.407-3). (6) Negotiate advance agreements..., packaging, and packing. (38) Ensure contractor compliance with contractual quality assurance requirements...

  2. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  3. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  4. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  5. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  6. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  7. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  8. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  9. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  10. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  11. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  12. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  13. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  14. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  15. Eleventh annual report of radiation exposures for DOE and DOE contractor employees

    International Nuclear Information System (INIS)

    1978-01-01

    In 1968, the US Atomic Energy Commission (AEC) established a program for reporting certain occupationa radiation exposure information to a central radiation records repository maintained at the Union Carbide Computing Technology Center, Oak Ridge, Tennessee. Annual summaries (WASH-1350-R1 through WASH-1350-R6) were reported for the years 1968-1973 and included data on AEC contracter employees as well as employees of companies in the private sector licensed by the AEC. In January 1975, the operational functions of the AEC, including the maintenance of records on the occupational radiation exposure on contractor employees, were transferred to the Energy Research and Development Administration (ERDA) and the AEC's regulatory functions, including the reporting of information on the occupational radiation exposure of licenses, were transferred to the Nuclear Regulatory Commission (NRC). Previous AEC licenses then reported to NRC while the contractors reported to ERDA. On October 1, 1977, the Department of Energy (DOE) was formed and assumed the responsibilities of ERDA. This report contains the 1978 radiation exposure data for DOE and DOE contractors

  16. 48 CFR 509.308-2 - Testing performed by the Government.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-2 Testing performed by the Government. In FSS solicitations and contracts that will have the...

  17. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  18. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  19. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  20. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  1. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  2. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  3. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  4. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  5. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  6. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  7. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  8. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  9. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  10. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  11. Institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    Results show that contractors face institutional constraints (work allocation limitations, lack of performance incentives and high transaction costs, such as negotiation costs, the risk of a loss in work and contract default risk), cash flow problems, poor physical infrastructure and a lack of labour. It is expected that the promotion ...

  12. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  13. Performance of consultants on government projects in ghana: Client and contractor pespective

    Directory of Open Access Journals (Sweden)

    J. Dadzie

    2013-07-01

    Full Text Available Construction project consultants share the characteristics of helping their clients address problems and improve upon project performance; they have a passion for the wisdom and expertise they bring to the project, and they have the ability to galvanize clients into action. However, it is an open secret that many projects often delay. Also, it is a known fact that most project contract figures swell more than double the original tender figure. Meanwhile, there are supervising consultants who are engaged and paid to manage such important projects. Their role however, is to complement the effort of contractors to ensure a successful completion of a project. The aim of this research is to identify factors affecting the performance of consultants on government projects, and to rank these factors according to their relative importance from the perspective of consultants. Analysis of the factors considered in a survey indicate that the main factors negatively affecting the performance of consultants are: urgency of the project at hand, project duration, variations, political influence from higher authority, timely decision making on the part of the consulting team and the experience of the design team on the project. The others are the ability of the consultants to work as a team, creativity on the part of the consultants in controlling cost and developing own efficiencies so that contract sums are kept within budget .

  14. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  15. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  16. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  17. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  18. Representation a Framwork for Contractors Selection Via of Health, Safety and Environment

    Directory of Open Access Journals (Sweden)

    Shahram Mahmoudi

    2016-12-01

    Full Text Available Introduction: Quality and efficiency of health, safety, and environment (HSE management systems play a vital role in achieving their goals. Considering outputs and objective achievement make continuous improvement of services and products, internal and external customer satisfaction, adopting a systematic way for performing various tasks, system performance and analysis very important. The present study was conducted to construct a proper framework for assessing MAPNA group contractors in terms of their health, safety, and environment performance.  . Method: In the first step of the study, all documents and literature associated with performance assessment were reviewed. In the second step, using a focus group approach, a basic model for assessing HSE management system was designed. Lastly, the framework was tested and credited on three major contractors of MAPNA group. Results: The proposed framework was composed of five criteria. The main criteria was the pattern of HSE process implementation which had seven sub-criteria and 120 guiding hints. Moreover, the five criteria were able to assess the organizational capabilities in terms of health, safety, and environment management.. Conclusion: The proposed framework make contractors able to promote their HSE performances by identifying organizational strong and weak points, prioritizing improvement projects, and also monitoring the pace of improvement in achieving organizational excellence..

  19. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  20. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  1. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  2. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  3. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  4. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  5. Financial Planning and Management Practices of Electrical Contractors

    Directory of Open Access Journals (Sweden)

    Lucko Gunnar

    2016-12-01

    Full Text Available Contractors must carefully manage their cash outflows (e.g., for materials to enable their work and inflows (after the work to be profitable, particularly in an economy that is still recovering from the 2008-2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

  6. Control of subcontractors by civil works contractor for a nuclear power plant

    International Nuclear Information System (INIS)

    Jiang Xinguo

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail

  7. Control of subcontractors by civil works contractor for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinguo, Jiang [Huaxing Construction Company, Yizheng, JS (China)

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail.

  8. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  9. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  10. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  11. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  12. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  13. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  14. 75 FR 31744 - Information Collection; Contract Operations and Administration

    Science.gov (United States)

    2010-06-04

    .... Forest Service officers collect the information from contractors who may be individuals, private sector... products including: (1) Planning and scheduling contract administration workloads, (2) planning and...

  15. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  16. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  17. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  18. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  19. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  20. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  1. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  2. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Science.gov (United States)

    2010-10-01

    ... Clauses 52.230-6 Administration of Cost Accounting Standards. As prescribed in 30.201-4(d)(1), insert the following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering the Cost Accounting Standards (CAS) requirements under this contract, the Contractor shall take the...

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  4. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  5. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  6. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  7. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  8. DOE contractor trade network: a decade of experience in training resource exchange

    International Nuclear Information System (INIS)

    Croll, P.; Weseman, M.

    1989-01-01

    Training Resources and Data Exchange (TRADE) refers to a series of activities designed to increase communication and exchanges of ideas, information, and resources among US Department of Energy contractor operated facilities in the field of training and human resource development. TRADE activities are planned and implemented by the DOE Contractor TRADE Executive Committee. TRADE objectives are accomplished through conference workshops, publications, and special interest groups. TRADE special interest groups include the following: computer-based training, emergency preparedness, industrial hygiene training, human resource issues, radiation protection training, safeguards and security training. The authors discuss how TRADE has evolved to meet changing contractor needs to improve human performance over the last 10 years. TRADE currently has working agreements to share training information with INPO, the Federal Laboratories Consortium, and the National Registry of Radiation Protection Technologists

  9. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  10. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  11. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  12. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  13. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  14. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  15. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  16. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  17. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  18. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  19. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  20. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  1. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  2. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  3. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  4. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    Chockie, Alan

    2005-09-01

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  5. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  6. 42 CFR 421.316 - Limitation on Medicare integrity program contractor liability.

    Science.gov (United States)

    2010-10-01

    ... services to a MIP contractor is not in violation of any criminal law or civilly liable under any law of the United States or of any State (or political subdivision thereof) by reason of the performance of any duty...

  7. 78 FR 73818 - Information Collection; Timber Sale Contract Operations and Administration

    Science.gov (United States)

    2013-12-09

    .... Forest Service officers collect the information from contractors who may be individuals, private sector... timber and other forest products, in order to: (1) Plan and schedule contract administration workloads...

  8. Building America Best Practices Series. Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Adams, K. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Love, Pat M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-05-01

    This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

  9. Administrative Task Performance by Heads of Senior High Schools ...

    African Journals Online (AJOL)

    This study aimed at examining the administrative task performance of heads of senior high schools (SHS) in Ghana from the organising perspective. The study hypothesized that there is no statistically significant difference in the compliance level of organising as an administrative task performance by heads in the rural and ...

  10. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  11. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  12. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  13. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  14. Performance-based Reward Administration Enhancing Employees’ Feelings of Interactional Justice

    Directory of Open Access Journals (Sweden)

    Azman Ismail

    2017-04-01

    Full Text Available The transformation in international business landscape has changed organizational management especially reward administration. This is done in order to maintain the organization’s competitiveness in global market place. In the field of reward administration, an emerging trend can be observed whereby most organizations are moving toward the application of psychological elements in administering organizational reward system. The ultimate objective of this study is to investigate the association between performance-based reward administration and interactional justice. The proposed model was empirically tested using a sample of 113 employees from fire and rescue agency in Peninsular Malaysia. This study found an evidence that performance-based reward administration (i.e., communication, participation and performance appraisal is positively and significantly associated with interactional justice. This findings proves that the ability of administrators to appropriately implement communication openness, inspire participative decision-making and organize fairness performance appraisal in administering performance-based reward have significantly evoked the feeling of interactional justice when employees perceived that they are being fairly treated in the reward system.

  15. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  16. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  17. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  18. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  19. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  20. The impact of customer-contractor interactions on spacecraft innovation: Insights from communication satellite history

    Science.gov (United States)

    Szajnfarber, Zoe; Stringfellow, Margaret V.; Weigel, Annalisa L.

    2010-11-01

    This paper captures a first detailed attempt to quantitatively analyze the innovation history of the space sector. Building on a communication satellite innovation metric and a spacecraft innovation framework developed as part of an ongoing project, this paper presents a preliminary model of global communication satellite innovation. In addition to innovation being a function of the rate of performance normalized by price, innovation was found to be strongly influenced by characteristics of the customer-contractor contractual relationship. Specifically, Department of Defense contracts tend to result in a lower level of innovation on average as compared to other customers. Also, particular customer-contractor pairs perform differently and exhibit a second order relationship in time.

  1. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  2. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  3. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  4. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    Science.gov (United States)

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  5. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  6. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  7. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  8. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  9. Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BASCHE, A.D.

    2000-01-01

    The purpose of the Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor is to provide a third-party quantitative and qualitative cost and schedule risk analysis of HNF-1946. The purpose of this Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor (TFC) is to document the results of the risk-based financial analysis of HNF-1946, Programmatic Baseline Summary for Phase 1 Privatization f o r the Tank Farm Contractor (Diediker 2000). This analysis was performed to evaluate how well the proposed baseline meets the U. S. Department of Energy, Office of River Protection (ORP) Letter OO-MSO-009, ''Contract NO. DE-AC06-99RL14047--The US Department of Energy, Office of River Protection (ORP) Mission Planning Guidance for Fiscal Year (FY) 2002--Revision 1'' (Short 2000). The letter requires a confidence level in the baseline schedule that is consistent with the Phase 1A readiness-to-proceed (RTP) assessment conducted in fiscal year (FY) 1998. Because the success of the project depends not only on the budget but also on the schedule, this risk analysis addresses both components of the baseline

  10. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  11. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  12. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  13. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

    Science.gov (United States)

    Dorman, Lane

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

  14. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  15. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  16. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  18. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  19. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  20. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  1. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  2. 34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.

    Science.gov (United States)

    2010-07-01

    ... all funds collected by its employees and contractors. (c) If an institution uses a billing service to carry out billing procedures under § 674.43, the institution shall ensure that the service— (1) Provides... paragraph (f) of this section. (e) If an institution uses a billing service to carry out § 674.43 (billing...

  3. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  4. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  5. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  6. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  7. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  8. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  9. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  10. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  11. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  12. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  13. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  14. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  15. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  16. The weaknesses of China's contractors in overseas construction project management: 2 case studies

    Directory of Open Access Journals (Sweden)

    Ph. D. Mo Xuan

    2012-05-01

    Full Text Available The practices of international construction contracting have been prevalent increasingly over the past half a centuru, Altough the contractors of highly developed world have dominated this field, there tends to be more players from newly emerging countries like China. The history of China's contractors performing in the overseas construction markets is divided into 3 major phases, namely the planning economy era, reform and openness perios and the latest nwe millennium. However, the know-how and techniques of modern project management have been widely deployed in China for merely 2 decades. While competing with those veterans in overseas markets, China's contractors still lack adequate advantages as well as experiences, leading to the underperformance or even failures. A 2-dimension framework of overseas project management, comprising the external risk and internal function aspects , is proposed. Based on the analysis of 2 recent cases in Saudi Arabia an Poland respectively, it's foung that the low cost strategy management in risk, commerce, cost, human resources, etc. are their fatal weaknesses.

  17. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  18. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  19. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  20. 48 CFR 42.1501 - General.

    Science.gov (United States)

    2010-10-01

    ... administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and...); the contractor's record of integrity and business ethics, and generally, the contractor's business...

  1. THE EFFECT TRANSFORMATIONAL LEADERSHIP, PERSONALITY AND JOB PERFORMANCE ADMINISTRATION EMPLOYEE

    OpenAIRE

    Andinasari, Andinasari; Sujanto, Bedjo; Mukhtar, Mukhneri

    2017-01-01

    The purpose of this study was determine the effect transformational leadership, personality and job performance administration employeeUniversity of Indonesian Teachers Union of Palembang (PGRI). This research try answer problems about job performance involving of 144 administration employee had been selected from the target population of 223 employee by using quantitative approach with path analysis methods.  The reseach of conclude show (1) transformational leadership had a direct effe...

  2. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  3. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  4. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  5. The influence of government targeted procurement strategies on the growth performance of construction small and medium-sized contractors (SMCs in South Africa

    Directory of Open Access Journals (Sweden)

    Abdurauf Adediran

    2017-12-01

    Full Text Available This paper examines government targeted procurement (TP strategies in South Africa and whether these strategies have an influence on the growth performance of Small and medium-sized contractors (SMCs in the construction industry. The rationale for this study stems from reports that while TP has been widely used as an instrument to improve the position of SMCs in the South African construction industry, three out of five SMCs do not become established firms. In addition, the nature of the influence of TP strategies on the growth performance of SMCs is not known. Following a review of existing literature, the study mainly adopted a quantitative research approach. Questionnaire surveys were administered to Construction Industry Development Board (cidb Grades 3 to 6 contractors that have executed TP projects within the last 5 years. The collected data was subjected to descriptive and inferential statistical analyses – Spearman’s rank order correlation was used as an index of association between the study variables. The study found that tendering equity is the most frequently used TP strategy, closely followed by preferencing and mandatory subcontracting. The study also found that positive significant associations exists among preferencing and turnover; third-party management and company assets; tendering equity, turnover and number of employees; as well as accelerated rotations, turnover and number of employees. The study concluded that government intervention through targeted procurement has the potential to achieve its intended results of improving the position of historically disadvantaged SMCs in the construction industry in South Africa if selected and implemented appropriately.

  6. The quality of Medicaid and Medicare data obtained from CMS and its contractors: implications for pharmacoepidemiology.

    Science.gov (United States)

    Leonard, Charles E; Brensinger, Colleen M; Nam, Young Hee; Bilker, Warren B; Barosso, Geralyn M; Mangaali, Margaret J; Hennessy, Sean

    2017-04-26

    Administrative claims of United States Centers for Medicare and Medicaid Services (CMS) beneficiaries have long been used in non-experimental research. While CMS performs in-house checks of these claims, little is known of their quality for conducting pharmacoepidemiologic research. We performed exploratory analyses of the quality of Medicaid and Medicare data obtained from CMS and its contractors. Our study population consisted of Medicaid beneficiaries (with and without dual coverage by Medicare) from California, Florida, New York, Ohio, and Pennsylvania. We obtained and compiled 1999-2011 data from these state Medicaid programs (constituting about 38% of nationwide Medicaid enrollment), together with corresponding national Medicare data for dually-enrolled beneficiaries. This descriptive study examined longitudinal patterns in: dispensed prescriptions by state, by quarter; and inpatient hospitalizations by federal benefit, state, and age group. We further examined discrepancies between demographic characteristics and disease states, in particular frequencies of pregnancy complications among men and women beyond childbearing age, and prostate cancers among women. Dispensed prescriptions generally increased steadily and consistently over time, suggesting that these claims may be complete. A commercially-available National Drug Code lookup database was able to identify the dispensed drug for 95.2-99.4% of these claims. Because of co-coverage by Medicare, Medicaid data appeared to miss a substantial number of hospitalizations among beneficiaries ≥ 45 years of age. Pregnancy complication diagnoses were rare in males and in females ≥ 60 years of age, and prostate cancer diagnoses were rare in females. CMS claims from five large states obtained directly from CMS and its contractors appeared to be of high quality. Researchers using Medicaid data to study hospital outcomes should obtain supplemental Medicare data on dual enrollees, even for non-elders. Not

  7. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  8. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  9. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  10. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  11. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  12. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  13. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  14. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  15. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  16. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  17. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  18. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  19. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  20. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  1. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  2. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  3. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  4. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  5. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  6. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  7. Representation of a Method for Identification of the Best Safe Contractors by Fuzzy Input Efficiency Profiling and AHP

    Directory of Open Access Journals (Sweden)

    F. Taheri

    2011-04-01

    Full Text Available Background and Aims Health, Safety and Environment (HSE performance measurement of the contractors and identification of the best ones can make a perception of the past changes in their HSE performance. Consequently, this may motivate them and provide an opportunity to improve their quality of services. The aim of this study is to rank the contractor-companies of one of the Iranian steel manufacturing companies considering their safety behavior and also to determine the best combination of contractors-companies.   Methods safety behavior sampling method used to determine the status of unsafe acts. The fuzzy efficiency numbers of each input were ranked by Chen & Klein method. To obtain a final ranking AHP was applied. The obtained rankings by FIEP-AHP were compared to the ranking of DEA.   Results Results indicated that the most frequent unsafe behaviors were related to not-using or miss-using the PPE, using broken tools and inappropriate working condition respectively. A significant relationship between experience, education and age with safety behaviors was obtained (p<0.05. Results showed that companies’ number 2 and 6 had respectively the best and worst ranks.   Conclusion Because FIEP increases the power of recognition especially when the number of DMUs is lower than inputs and outputs, it can be suggested as an appropriate model for determining the best contractor companies.

  8. Fiscal year 1999 Battelle performance evaluation and fee agreement

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  9. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  10. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  11. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  12. Fiscal year 1999 Battelle performance evaluation and fee agreement; TOPICAL

    International Nuclear Information System (INIS)

    DAVIS, T.L.

    1998-01-01

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory

  13. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  14. 41 CFR Appendix A to Part 60 - 250-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Science.gov (United States)

    2010-07-01

    ... modified work schedules. For instance, flexible or adjusted work schedules could benefit special disabled... difficulty performing his or her job. 1. A contractor is required to make reasonable accommodations to the... the skill, experience, education and other job-related selection criteria, and can perform the...

  15. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  16. 77 FR 6985 - General Services Administration Acquisition Regulation; Reinstatement of Coverage Pertaining to...

    Science.gov (United States)

    2012-02-10

    ... Acquisition Regulation; Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building... Administration Acquisition Regulation (GSAR) to restore guidance on the release of claims after completion of construction and building service contracts to ensure contractors are paid in accordance with their contract...

  17. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  18. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  19. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  20. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  1. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  2. THE EVALUATION OF THE IMPLEMENTATION OF CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS PROGRAM ON TURNAROUND PROJECT (TA AT PT. PUPUK SRIWIDJAJA (PUSRI PALEMBANG

    Directory of Open Access Journals (Sweden)

    Muhammad Arif

    2016-03-01

    Full Text Available Background :Turnaround is one of the done by contractor in which if it is not managed well, it could cause work accident. The purpose of this study was to evaluate the implementation of contractor safety management system (CSMS program on turnaround project at PT. Pupuk Sriwidjaja Palembang. Method : This study was a qualitative study. The information was obtained from deep interview, observation and the study of document. The data was analyzed by using content analysis. The validity of the instruments was tested through triangulation of sources, method and data Result : The program implementation Contractor Safety Management System (CSMS on a turnaround project is already well underway only on projects in addition to departments turnaround K3 & LH less involved in the risk assessment stage, pre-qualification and selection of contractors. Conclusion : The implementation of the program Contractor Safety Management System (CSMS on a turnaround project at PT. Pupuk Sriwidjaja Palembang are in accordance with the Code of Labor Management Health, Safety and Environmental Protection Contractor BPMIGAS. It is advisable to PT. Pupuk Sriwidjaja Palembang in order to improve communication between departments procure goods and services with K3 and LH-related departments work tendered as the risk assessment stage, pre-qualification and selection on work tendered. Need sanctions against contractors who do not regularly report performance data K3.

  3. Job Performance and Gender Factors of Administrative Staff in South West Nigeria Universities

    Science.gov (United States)

    Olorunsola, E. O.

    2012-01-01

    This study examines the level of administrative staff job performance in South West Nigerian universities and also investigates whether the administrative staff job performance is related to their sexual characteristics. An instrument titled Job Performance Questionnaire (JPQ) was used to collect the data and was administered 400 subjects in…

  4. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  5. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  6. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  7. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  8. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of January 31, 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  9. Tort Suits Against Federal Contractors: An Overview of the Legal Issues

    Science.gov (United States)

    2011-04-07

    Although tort law “exists on a spectrum of culpability,”16 most plaintiffs seeking recovery bring their tort suits based on a theory of negligence ...in contract terms and performance. Other contractors have asserted that state tort law claims against them are preempted under the Federal Tort ...based its decision on the “discretionary function” exception to the FTCA, some lower courts have found that state tort law claims may also be

  10. PLAN FOR PERFORMANCE ADMINISTRATION IN PYRAMIDAL STRUCTURE ORGANIZATIONS

    Directory of Open Access Journals (Sweden)

    Domingo Alarcón Ortiz

    2013-11-01

    Full Text Available Performance administration has become a current strategy in evaluating management within organizations, but its implementation often lacks an action plan, resulting from the valuation of climate and leadership styles embedded in the culture of the organization. This paper proposes a model action plan for performance management, which has been implemented, executed and evaluated in pyramidal organizational structure organizations where a diagnosis of the cultural climate and leadership styles recurring in the organization have been previously made.

  11. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  12. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  13. 75 FR 76692 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Science.gov (United States)

    2010-12-09

    ..., and 252 RIN 0750-AG58 Defense Federal Acquisition Regulation Supplement; Business Systems--Definition... for Business Systems--Definition and Administration (DFARS Case 2009-D038) in the Federal Register on... improve the effectiveness of DoD oversight of contractor business systems. The comment period is being...

  14. 45 CFR 74.43 - Competition.

    Science.gov (United States)

    2010-10-01

    ... to ensure objective contractor performance and eliminate unfair competitive advantage, contractors... 45 Public Welfare 1 2010-10-01 2010-10-01 false Competition. 74.43 Section 74.43 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS...

  15. Performance measurement of administration services using balance scorecard and Kano model

    Directory of Open Access Journals (Sweden)

    Abolfazl Danaei

    2014-04-01

    Full Text Available This paper performs a survey to measure the performance of an administration unit in Iran based on a popular technique of balance scorecard. The study also uses Kano model to prioritize various factors and to provide necessary recommendation to improve the performance of different units. The survey has indicated that while these offices do well in terms of financial figures as well as customer perspective, they perform poorly in terms of learning and growth. According to our survey, it is essential to use information technology in general service offices, properly. In addition, these administrative agencies need to use hardware and software packages, more efficiently and these two basic items have received much attraction.

  16. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  17. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  18. 76 FR 30088 - Notice of Public Meeting of the Assembly of the Administrative Conference of the United States

    Science.gov (United States)

    2011-05-24

    ..., and (4) enhanced ethics requirements for contractors that do business with the government. To... provides best practices for effective use of video. (4) The recommendation ``Government Contractor Ethics'' addresses improvements to ethics regulation for government contractor employees, who are now performing more...

  19. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  20. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  1. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  2. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  3. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  4. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  5. E-Government, Audit Opinion, and Performance of Local Government Administration in Indonesia

    Directory of Open Access Journals (Sweden)

    Bambang Sutopo

    2017-12-01

    Full Text Available Local governments (LGs have an important role in providing services to the community. Nevertheless, some local governments still show relatively low performance. Scores of e-government implementation and audit opinions obtained by some local governments are also relatively low. This study examines whether there are relationships between e-government, the dimensions of e-government, and audit opinion and the performance of the local government administration. There are five dimensions of the e-government i.e. policy, institutions, infrastructure, applications, and planning. The sample used in this study includes 246 local governments from 2012 to 2014. Using regression analysis, the results of this study show that e-government has a positive association with the performance of the local government administration. This is supported by the positive association of e-government’s dimensions with performance. The audit opinion is also positively associated with performance as expected. These results suggest that e-government and audit opinion can be used as indicators of the performance of local government administration.

  6. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  7. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  8. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...

  9. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2012-10-31

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment... Collection: Office of Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of... become contractors for the U.S. Department of State, Office of Language Services, the information...

  10. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment and...: Title of Information Collection: Office of Language Services Contractor Application Form. OMB Control... States. If candidates successfully become contractors for the U.S. Department of State, Office of...

  11. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...

  12. Assessing Contractor Capabilities for Streamlined Site Investigations

    Science.gov (United States)

    The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.

  13. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of the end of May 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  14. 76 FR 31365 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-05-31

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Contractor Certification as to Forced or Indentured Child Labor.'' This notice adds a product, hand-woven... of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child...

  15. PRINCIPLES OF THE EUROPEAN ADMINISTRATIVE SPACE AND THEIR IMPACT ON PERFORMANCE IN PUBLIC ORGANIZATIONS

    Directory of Open Access Journals (Sweden)

    Alexandra Ema Cioclea

    2012-09-01

    Full Text Available The European Union is interested in ensuring that each national administration offers comparable administrative capacity through quality of public services and professionalism from the civil servants. At the same time, the European states are characterised by long and varied institutional histories, with different trajectories in their evolution. That is why, public administration structures and regulations vary among the Member States and a set of common principles can guide them towards administrative convergence and performance. This paper aims to analyze the shared principles of a common European Administrative Space and also to address the link between these principles and the performance of public institutions from a managerial point of view. The study is based on review and analysis of academic research, government documents and personal perspectives, extracting and linking key findings from existing research and practice. The paper argues that managerial theories on performance are compatible with public administration organizations and some of the criteria are common to those promoted by the principles of the European Administrative Space.

  16. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  17. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  18. Administrative Aspects of the Criticality Controls Used in Programmes for Basic Criticality Research, Reactor Development and Materials Processing

    Energy Technology Data Exchange (ETDEWEB)

    Wood, D. P.; Giessing, D. F. [Operational Safety Division, USAEC Albuquerque Operations Office, NM (United States)

    1966-05-15

    This paper describes the administrative and procedural aspects of criticality controls used by a field office of the United States Atomic Energy Commission in programmes that include reactor criticals, research and materials testing reactors, and power reactor development. Situations encountered include handling, storing, and processing large quantities of uranium-235 and plutonium-239 of various configurations and compositions in laboratories and operations which gather basic criticality data, processing of fissile material, and varied reactor research and development, programmes including fuel materials. Similar situations exist for uranium-233 and plutonium-238 on a smaller laboratory scale. The administrative controls and interactions of the USAEC field office and the operating contractors, who operate these installations for the USAEC, are outlined. Also, the purpose and scope of the direct examination by USAEC personnel of these contractor facilities are analysed. The programme has been in effect for three years and is believed to be successful in maintaining efficient operations and an acceptable low level of risk of inadvertent criticality. Success of this programme is in good measure due to the close working relationship between the staffs of the USAEC field office and the operating contractors. (author)

  19. Licensee contractor and vendor inspection status report: Quarterly report, January--March 1996. Volume 20, Number 1

    International Nuclear Information System (INIS)

    1996-05-01

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC's Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1996 through March 1996

  20. Licensee contractor and vendor inspection status report: Quarterly report, January--March 1997. Volume 21, Number 1

    International Nuclear Information System (INIS)

    1997-07-01

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC's Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1997 through March 1997

  1. Licensee contractor and vendor inspection status report: Quarterly report, July--September 1997. Volume 21, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results if inspections that were performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, and that were distributed to the inspected organizations during the period from July through September 1997.

  2. Licensee contractor and vendor inspection status report: Quarterly report, July - September 1997. Volume 21, Number 3

    International Nuclear Information System (INIS)

    1997-11-01

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results if inspections that were performed by the NRC's Special Inspection Branch, Vendor Inspection Section, and that were distributed to the inspected organizations during the period from July through September 1997

  3. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  4. US Department of Energy Office of Inspector General report on audit of program administration by the Office of Energy Research

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-02

    The objective of the audit was to determine whether Energy Research had established performance expectations, including performance criteria and metrics, and used these expectations to monitor progress for basic and applied research performed at the Department`s national laboratories. Congressional and Departmental initiatives envision improved contract and program performance by requiring program managers to set measurable performance expectations. Even though research outcomes are inherently unpredictable, performance expectations can and should be established for scopes of work, milestones, resource limits and deliverables. However, Energy Research generally did not clearly specify--at either an aggregated program or individual task level--such expectations for research at the Department`s national laboratories. While information was available in the contractor`s research proposals, Energy Research essentially relied on the contractors to initiate and execute the research without agreement on expectations. This practice provided the Department with little basis to measure and evaluate contractor performance. Energy Research agreed in part with the finding and will take action on the recommendations in the report.

  5. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    Pemberton, S.

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  6. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  7. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  8. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any proceedings...

  9. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-03-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  10. Fire-safety engineering and performance-based codes

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    project administrators, etc. The book deals with the following topics: • Historical presentation on the subject of fire • Legislation and building project administration • European fire standardization • Passive and active fire protection • Performance-based Codes • Fire-safety Engineering • Fundamental......Fire-safety Engineering is written as a textbook for Engineering students at universities and other institutions of higher education that teach in the area of fire. The book can also be used as a work of reference for consulting engineers, Building product manufacturers, contractors, building...... thermodynamics • Heat exchange during the fire process • Skin burns • Burning rate, energy release rate and design fires • Proposal to Risk-based design fires • Proposal to a Fire scale • Material ignition and flame spread • Fire dynamics in buildings • Combustion products and toxic gases • Smoke inhalation...

  11. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  12. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  13. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ... Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense.../Pension Review from Procedures, Guidance, and Information to the Defense Acquisition Regulation Supplement..., February 23, 2006, moved requirements for Contractor Insurance/Pension Review (CIPR) from DFARS 242.7302 to...

  14. Hanford analytical services quality assurance requirements documents. Volume 1: Administrative Requirements

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1997-01-01

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  15. Influence of Principals' Administrative Style on the Job Performance ...

    African Journals Online (AJOL)

    The objective was to evaluate the administrative style of secondary school principals in relation to teachers' job performance in Cross River State, Nigeria. A total of four hundred (400) teachers and one thousand two hundred (1200) students were randomly sampled for the study, using Ex-post facto research design with ...

  16. 41 CFR Appendix A to Part 60 - 741-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Science.gov (United States)

    2010-07-01

    ... disability. Job restructuring may also involve allowing part-time or modified work schedules. For instance, flexible or adjusted work schedules could benefit persons who cannot work a standard schedule because of... having significant difficulty performing his or her job. 1. A contractor is required to make reasonable...

  17. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  18. Contractors' Support of U.S. Operations in Iraq

    National Research Council Canada - National Science Library

    Frisk, Daniel; Trunkey, R. D; Talaber, Adam; Adedeji, Adebayo; Liu, Victoria; Dennis, Robert; Gullo, Theresa; Sammartino, Frank; Murphy, Robert; Elsea, Jennifer

    2008-01-01

    .... This paper, which covers the period from 2003 through 2007, provides an overview of the federal costs of employing contractors in Iraq and in nearby countries, the type of products and services...

  19. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  20. 48 CFR 227.7207 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7207 Section 227.7207 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Computer Software and Computer Software Documentation 227.7207 Contractor data repositories. Follow 227.7108 when it is in the Government's interests to have a data repository include computer software or to...

  1. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reimbursement of cost for transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer...

  2. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  3. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    Science.gov (United States)

    2008-09-29

    reporting procedures, bad investigation methods and unfair double standards amongst employees should not be condoned." Tom Jackman , “Security Contractor...Cleared in Two Firings”, Washington Post, August 2, 2007. p. A-15. 43 Tom Jackman . “U.S. Contractor Fired on Iraqi Vehicles for Sport, Suit Alleges...Public Diplomacy and Public Affairs Karen Hughes , speaking before the Council on Foreign Relations, New York City, N.Y., on May 10, 2006, said of the new

  4. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  5. Defense Trade Contractors Engage in Varied International Alliances

    National Research Council Canada - National Science Library

    2000-01-01

    .... Generally, two or more companies form a team by negotiating an agreement to work together to pursue a particular government procurement, with one company acting as the primary contractor and others as subcontractors...

  6. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of... one or more phases, dependent on one or more power sale contracts. The proposed wind park would... that limit construction vehicle speed limits. Foresight indicated that the wind park contractor will...

  7. Setting the Record Straight: Strong Positive Impacts Found from the National Evaluation of Upward Bound. Re-Analysis Documents Significant Positive Impacts Masked by Errors in Flawed Contractor Reports

    Science.gov (United States)

    Cahalan, Margaret; Goodwin, David

    2014-01-01

    In January 2009, in the last week of the Bush Administration, the U.S. Department of Education (ED), upon orders from the departing political appointee staff, published the final report in a long running National Evaluation of Upward Bound (UB). The study was conducted by the contractor, Mathematica Policy Research. After more than a year in…

  8. Exploring factors affecting owners' trust of contractors in construction projects: a case of China.

    Science.gov (United States)

    Tai, Shuangliang; Sun, Chengshuang; Zhang, Shoujian

    2016-01-01

    It has been found that a low level of trust among members of a construction project team leads to poor performance in China. Many researchers have described the challenges, consequently advocating partnering as an attractive approach for more valuable cooperation. Because substantial investments have been poured into construction projects since the year 2000, trust research will improve the performance of construction projects and will be meaningful to the Chinese construction industry. The purpose of this paper is to investigate the attributes affecting owners' trust of contractors, to understand the potential properties of these factors, and to rank the factors in order of importance. Twenty-four attributes are identified from a literature review. Supported by qualitative reviews, a questionnaire is conducted to obtain relevant data, and 168 valid responses are obtained for data analysis. Principal component analysis (PCA) is employed to find the factor structure of the identified trust attributes. By the method of PCA, the attributes are extracted into eight factors, including interaction history, information sharing and communication, contract and institution, relation-specific investment, reputation, integrity, competence, and opportunistic behaviour. The value and originality of this paper are embodied in using PCA to understand the various attribute groupings and to illuminate trust impact factors in the Chinese context. When they understand the critical factors affecting trust better, owners and contractors can devise more appropriate strategies to improve performance.

  9. Energy Renovations: Volume 17: Insulation - A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Adams, Karen; Hefty, Marye G.; Gilbride, Theresa L.; Love, Pat M.

    2012-05-15

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

  10. TAP 2: Performance-Based Training Manual

    International Nuclear Information System (INIS)

    1993-08-01

    Cornerstone of safe operation of DOE nuclear facilities is personnel performing day-to-day functions which accomplish the facility mission. Performance-based training is fundamental to the safe operation. This manual has been developed to support the Training Accreditation Program (TAP) and assist contractors in efforts to develop performance-based training programs. It provides contractors with narrative procedures on performance-based training that can be modified and incorporated for facility-specific application. It is divided into sections dealing with analysis, design, development, implementation, and evaluation

  11. Defense Contract Audit Agency Audits of Contractor Compliance with Cost Accounting Standards

    Science.gov (United States)

    1999-01-11

    Appendix B. Continued Need for Cost Accounting Standards Asset Valuations. GAAP requires that assets be revalued after mergers and acquisitions. If the...purchase method is used to revalue assets , depreciation and amortization costs may increase drastically to be passed on as increased costs on...contractor fully for the assets through normal depreciation . Contractor Pension Plans. Government-funded pension assets must be properly allocated

  12. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    Science.gov (United States)

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  13. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... otherwise authorized by law or regulation. Any release containing contractor bid or proposal information or..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as...

  14. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  15. Financial Reporting by Selected Defense Agencies of Government Property in the Custody of Contractors

    National Research Council Canada - National Science Library

    1997-01-01

    ... over the $92 billion of Government property in the custody of contractors. After several years of planning, DoD has not developed a standard accounting system for recording, tracking, and reporting Government property in the custody of contractors...

  16. Environmental Management Performance Report - October 2002

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of the end of October 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  17. Energy Research and Development Administration, Division of Safety, Standards, and Compliance respirator manual

    International Nuclear Information System (INIS)

    Douglas, D.D.; Hack, A.L.; Held, B.J.; Revoir, W.H.

    1976-05-01

    The manual has been prepared to provide technical information for contractors of the Energy Research and Development Administration (ERDA) on the application of respiratory protective devices for protection against airborne contaminants, both radioactive and nonradioactive. The various elements of a respirator program including selection and maintenance of equipment and training of personnel are described to assist in establishing adequate programs

  18. Energy Research and Development Administration, Division of Safety, Standards, and Compliance respirator manual

    Energy Technology Data Exchange (ETDEWEB)

    Douglas, D.D.; Hack, A.L.; Held, B.J.; Revoir, W.H.

    1976-05-01

    The manual has been prepared to provide technical information for contractors of the Energy Research and Development Administration (ERDA) on the application of respiratory protective devices for protection against airborne contaminants, both radioactive and nonradioactive. The various elements of a respirator program including selection and maintenance of equipment and training of personnel are described to assist in establishing adequate programs.

  19. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor... contracting officer must check the List of Products Requiring Contractor Certification as to Forced or...

  20. Energy Renovations: Volume 14: HVAC - A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Gilbride, Theresa L.; Baechler, Michael C.; Hefty, Marye G.; Hand, James R.; Love, Pat M.

    2011-08-29

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various energy-efficient options for heating, cooling, and ventilating existing homes. The report provides descriptions of many common and not-so-common HVAC systems, including their advantages and disadvantages, efficiency ranges and characteristics of high-performance models, typical costs, and climate considerations. The report also provides decision trees and tables of useful information for homeowners who are making decisions about adding, replacing, or upgrading existing HVAC equipment in their homes. Information regarding home energy performance assessments (audits) and combustion safety issues when replacing HVAC equipment are also provided.

  1. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  2. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  3. Effect of glucose infusion on endurance performance after beta-adrenoceptor blocker administration

    NARCIS (Netherlands)

    van Baak, M.A.; Mooij, J.M.

    1994-01-01

    Effect of glucose infusion on endurance performance after beta-adrenoceptor blocker administration. Van Baak MA, Mooij JM. Department of Human Biology, University of Limburg, Maastricht, The Netherlands. To investigate the effect of glucose (Glc) infusion on endurance performance after

  4. Knowledge exchange and learning from failures in distributed environments: The role of contractor relationship management and work characteristics

    International Nuclear Information System (INIS)

    Gressgård, Leif Jarle; Hansen, Kåre

    2015-01-01

    Learning from failures is vital for improvement of safety performance, reliability, and resilience in organizations. In order for such learning to take place in distributed environments, knowledge has to be shared among organizational members at different locations and units. This paper reports on a study conducted in the context of drilling and well operations on the Norwegian Continental Shelf, which represents a high-risk distributed organizational environment. The study investigates the relationships between organizations' abilities to learn from failures, knowledge exchange within and between organizational units, quality of contractor relationship management, and work characteristics. The results show that knowledge exchange between units is the most important predictor of perceived ability to learn from failures. Contractor relationship management, leadership involvement, role clarity, and empowerment are also important factors for failure-based learning, both directly and through increased knowledge exchange. The results of the study enhance our understanding of how abilities to learn from failures can be improved in distributed environments where similar work processes take place at different locations and involve employees from several companies. Theoretical contributions and practical implications are discussed. - Highlights: • We investigate factors affecting failure-based learning in distributed environments. • Knowledge exchange between units is the most important predictor. • Contractor relationship management is positively related to knowledge exchange. • Leadership involvement, role clarity, and empowerment are significant variables. • Respondents from an operator firm and eight contractors are included in the study

  5. Army Depot Maintenance: More Effective Use of Organic and Contractor Resources

    Science.gov (United States)

    1990-06-04

    terkerrny (PA) RRAD Red River (TX) IBAD Lexingtor).Bluegrass (KY) 3MPUAD Pueblo (CO) 2000 ANAD CCAD TEAD TOAD SAAO LEAD FMD LBAD PUAfl j] Aut)’onzed Onboard...until it is received by the contractor. That problem could be eliminated by redesigning the process. Specifically, the FTA document that notifies the...should revise CCSS to allow the FTM document to generate an image to LCA, the FTA to create a due-in to the contractor, and CCSS to determine the depot

  6. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  7. Private Military Contractors, War Crimes and International ...

    African Journals Online (AJOL)

    The end of the Cold War witnessed the growth and spread of legally established private military contractors (PMCs) playing largely undefined roles in wars, international security and post-conflict reconstruction. The operations of PMCs in Iraq and Afghanistan in the 21st century have been marked by gross human rights ...

  8. 41 CFR Appendix A to Part 60 - 300-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Science.gov (United States)

    2010-07-01

    ... allowing part-time or modified work schedules. For instance, flexible or adjusted work schedules could... performing his or her job. 1. A contractor is required to make reasonable accommodations to the known... qualified with respect to that process. One is “otherwise qualified” if he or she is qualified for a job...

  9. WORKER PROTECTION: Federal Contractors and Violations of Labor Law

    National Research Council Canada - National Science Library

    1995-01-01

    ... of Federal Contract Compliance Programs (OFCCP). Federal law and an executive order place greater responsibilities on federal contractors compared with other employers In some areas of workplace activity...

  10. When Contractors Deploy: A Guide for the Operational Commander

    National Research Council Canada - National Science Library

    Buhler, Carl

    2000-01-01

    .... Furthermore, this paper also lists four recommendations for operational commanders and the military on how to better integrate contractors into the military effort, especially during hostile combat situations...

  11. APPROVAL OF WASTE TREATMENT AND IMMOBILIZATION PLANT CONTRACTOR-INITIATED AUTHORIZATION BASIS AMENDMENT REQUESTS (ABAR)

    International Nuclear Information System (INIS)

    JONES GL

    2008-01-01

    The objective is to describe the process used by the Office of River Protection (ORP) for evaluating and implementing Contractor-initiated changes to the Waste Treatment and Immobilization Plant (WTP) Authorization Basis (AB). The WTP Project's history has provided a unique challenge for establishing and maintaining an ORP-approved AB during design and construction. Until operations begin, the project cannot implement the classic Unreviewed Safety Question (USQ) process to determine when ORP approval of Contractor-initiated changes is required. A 'quasiUSQ' process has been implemented that defines when AB changes could occur. The three types of AB changes are (1) Limited Scope Changes, (2) Authorization Basis Deviations, and (3) Authorization Basis Amendment Request (ABAR). DOE RL/REG 97-13, 'Office of River Protection Position on Contractor-Initiated Changes to the Authorization Basis', describes the process the WTP Contractor must follow to make changes to the AB, with and without ORP approval. The process uses a 'safety evaluation' process that is similar to the USQ process but at a more qualitative level. The maturation of the WTP Contractor's facility design and activities, and other changing conditions, resulted in a process that allows the Contractor to make changes to the AB without ORP approval; however, those changes that may significantly affect nuclear safety do require ORP approval. This process balances the WTP regulatory principle of efficiency with assurance that adequate safety will not be compromised. The process has reduced the number of ABARs requiring ORP approval and reduced the potential for delays in design and procurement activities

  12. Haemoglobin mass and running time trial performance after recombinant human erythropoietin administration in trained men.

    Directory of Open Access Journals (Sweden)

    Jérôme Durussel

    Full Text Available UNLABELLED: Recombinant human erythropoietin (rHuEpo increases haemoglobin mass (Hb(mass and maximal oxygen uptake (v O(2 max. PURPOSE: This study defined the time course of changes in Hb(mass, v O(2 max as well as running time trial performance following 4 weeks of rHuEpo administration to determine whether the laboratory observations would translate into actual improvements in running performance in the field. METHODS: 19 trained men received rHuEpo injections of 50 IU•kg(-1 body mass every two days for 4 weeks. Hb(mass was determined weekly using the optimized carbon monoxide rebreathing method until 4 weeks after administration. v O(2 max and 3,000 m time trial performance were measured pre, post administration and at the end of the study. RESULTS: Relative to baseline, running performance significantly improved by ∼6% after administration (10:30±1:07 min:sec vs. 11:08±1:15 min:sec, p<0.001 and remained significantly enhanced by ∼3% 4 weeks after administration (10:46±1:13 min:sec, p<0.001, while v O(2 max was also significantly increased post administration (60.7±5.8 mL•min(-1•kg(-1 vs. 56.0±6.2 mL•min(-1•kg(-1, p<0.001 and remained significantly increased 4 weeks after rHuEpo (58.0±5.6 mL•min(-1•kg(-1, p = 0.021. Hb(mass was significantly increased at the end of administration compared to baseline (15.2±1.5 g•kg(-1 vs. 12.7±1.2 g•kg(-1, p<0.001. The rate of decrease in Hb(mass toward baseline values post rHuEpo was similar to that of the increase during administration (-0.53 g•kg(-1•wk(-1, 95% confidence interval (CI (-0.68, -0.38 vs. 0.54 g•kg(-1•wk(-1, CI (0.46, 0.63 but Hb(mass was still significantly elevated 4 weeks after administration compared to baseline (13.7±1.1 g•kg(-1, p<0.001. CONCLUSION: Running performance was improved following 4 weeks of rHuEpo and remained elevated 4 weeks after administration compared to baseline. These field performance effects coincided with r

  13. BUSINESS STRATEGY OF LARGE CONTRACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS: THE MALAYSIAN CASE

    Directory of Open Access Journals (Sweden)

    FRANKY AMBON

    2012-12-01

    Full Text Available Industrialised Building System (IBS is the term coined by the government and industry in Malaysia to represent the construction industry and the application of prefabrication method in building construction. The purpose of this exploratory research paper is to highlight business strategy being pursued by large Malaysian contractors in adopting IBS. The paper uses case study as research method. The analysis is based primarily on cross-case analysis and pattern matching technique. The paper observes contractors which involved in IBS are part of larger holding companies in a corporate set-up include design and manufacturing subsidiaries. The companies positioned themselves as one-stop total solution provider for IBS and offer a wider range of services from design, production, and installation to clients. To become competitive and able to create total solution, contractors need to establish cluster and consortium of integrated project team by creating a partnership when and where it is needed. A vendor development programme modelled along the lines of the development of automotive industry should also be established. Future empirical studies should extensively examine these areas, especially the development of business model for contractors. The availability of this model could help to accelerate the uptake of IBS among contractors.

  14. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  15. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  16. DOE contractor radiation safety CBT [computer based training] course

    International Nuclear Information System (INIS)

    Gardner, P.R.

    1986-01-01

    Westinghouse Hanford Company developed a generic Radiation Worker safety CBT course for Department of Energy contractors. Task analysis concentrated on actual and potential tasks and included visits to fourteen different contractor sites. Team Design and Prototype verification formed the major portion of the development phase. Lesson entry was accomplished using the WISE author system from WICAT Systems, Inc. The course features graded task simulations for both Pretest and Final; fourteen Topics in five Lessons, each Topic keyed to ''Critical Acts'' and Questions in the Pretest and Final; Automatic, Intensive, and Manual modes of instruction available for each Lesson; Practical Problems and Sample Questions associated with each Topic; and provisions for local configuration in several areas. The course is deliverable on IBM PC compatible equipment. 2 refs

  17. Medicare program; appeals of CMS or CMS contractor determinations when a provider or supplier fails to meet the requirements for Medicare billing privileges. Final rule.

    Science.gov (United States)

    2008-06-27

    This final rule implements a number of regulatory provisions that are applicable to all providers and suppliers, including durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) suppliers. This final rule establishes appeals processes for all providers and suppliers whose enrollment, reenrollment or revalidation application for Medicare billing privileges is denied and whose Medicare billing privileges are revoked. It also establishes timeframes for deciding enrollment appeals by an Administrative Law Judge (ALJ) within the Department of Health and Human Services (DHHS) or the Departmental Appeals Board (DAB), or Board, within the DHHS; and processing timeframes for CMS' Medicare fee-for-service (FFS) contractors. In addition, this final rule allows Medicare FFS contractors to revoke Medicare billing privileges when a provider or supplier submits a claim or claims for services that could not have been furnished to a beneficiary. This final rule also specifies that a Medicare contractor may establish a Medicare enrollment bar for any provider or supplier whose billing privileges have been revoked. Lastly, the final rule requires that all providers and suppliers receive Medicare payments by electronic funds transfer (EFT) if the provider or supplier, is submitting an initial enrollment application to Medicare, changing their enrollment information, revalidating or re-enrolling in the Medicare program.

  18. Contractor selection: a quantitative, consensus-friendly, transparent ...

    African Journals Online (AJOL)

    This article offers a method for selecting contractors in an objective, transparent and participative way. The use of the Decision Analysis System (DAS), also referred to as decision-making by objectives, makes it possible that a large number of objectives can be taken into account to select the best amongst a wide range of ...

  19. Security of payment regime in construction industry: are Malaysian sub-contractors ready?

    OpenAIRE

    Supardi, Azizan; Adnan, Hamimah; Mohammad, Mohammad Fadhil

    2011-01-01

    In Malaysia, the particularly small sized sub-contractors are definitely benefited from payment provisions in the proposed Construction Industry Payment and Adjudication Act (CIPA Act), but need to enhance their knowledge in order to improve their awareness of the benefits of the Act. Accordingly, this on-going research attempts to introduce proper guidelines to the sub-contractors, in giving the knowledge, to claim for payment. Firstly, the research explored the problems and legal issues rel...

  20. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  1. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    International Nuclear Information System (INIS)

    WOJTASEK, R.D.

    2000-01-01

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project

  2. Strategic Change in a Construction Contractor's Purchasing Organisation and Supplier Relations

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben

    2010-01-01

    The paper adopts a combined supply chain management and purchasing theory approach to changes in a contractor's purchasing organization and suppliers relations. This is seen to be a complex prolonged change process emerging over long time. The method is qualitative and longitudinal combining ex...... ante studies with ex post elements. As the time frame is ten years a necessary combination of studies with different aims has been done. The case of a major contractor's efforts within supply chain and purchasing exhibits a number of change elements in interaction; new business concepts, processes...

  3. The status of contractors workers operating in US nuclear power plants

    International Nuclear Information System (INIS)

    Lochard, J.

    1985-01-01

    The status of contractors operating in PWRs in the United States is described. The statistics concerning the trends of both the individual and collective exposures of these workers were analysed as well as their main demographic and sociological features. The data relative to the particular group of ''transient'' workers, i.e. those operating in several different power plants during the same year were also examined. The results presented show that the dosimetric and sociological profiles of contractors' workers, in US power plants, do not differ fundamentally from that of permanent workers [fr

  4. Administrator Leadership Styles and Their Impact on School Nursing Part II. A High-Performance School Nurse-Building Administrator Relationship Model.

    Science.gov (United States)

    Davis, Charles R; Lynch, Erik J

    2018-06-01

    There is a significant disparity in roles, responsibilities, education, training, and expertise between the school nurse and building administrator. Because of this disparity, a natural chasm must be bridged to optimize student health, safety, well-being, and achievement in the classroom while meeting the individual needs of both professionals. This article constructs and presents a new school nurse-building administrator relationship model, the foundation of which is formed from the pioneering and seminal work on high-performance professional relationships and outcomes of Lewin and Drucker. The authors posit that this new model provides the framework for successful school nurse-building administrator interactions that will lead to optimal student outcomes.

  5. Highway vehicle systems contractors coordination meeting. Seventeenth summary report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Separate abstracts was prepared for each of the 62 papers presented at the Contractors' Coordination meeting on highway vehicle systems. One paper had previously appeared in DOE's data base.

  6. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  7. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2013-03-22

    ... collection would violate the fundamental purposes of the Paperwork Reduction Act because of the burden it... subcontracting. We submit that fundamental preparation for a review is part of a contractor's normal course of... accounting of the contractors' time expenditure needed to prepare for a CPSR and respond to any contracting...

  8. 48 CFR 45.402 - Title to contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... the contract. Under fixed-price type contracts, in the absence of financing provisions or other... item. If a deliverable item is to be retained by the contractor for use after inspection and acceptance...

  9. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    International Nuclear Information System (INIS)

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study of actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980

  10. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study of actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.

  11. Needs of Non Energy-Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  12. Needs of Non-Energy Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liakus, C. [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  13. Contractors on the Battlefield Force Multipliers or Force Dividers?

    National Research Council Canada - National Science Library

    Nelson, Kim

    2000-01-01

    .... An increased reliance on contractor support has helped ease the burden on a heavily reduced force structure, but has left military commanders vulnerable to declaring a non-mission capable status during times of crisis...

  14. On the relationship between financial measures and contractor pricing strategy: Empirical tests in the defense aerospace industry

    OpenAIRE

    Moses, O. Douglas

    1987-01-01

    This report includes two separate but related empirical studies of the relationship between financial measures for defense aerospace contractors and pricing strategies adopted by contractors. Two pricing strategies are identified: skimming and penetration. Collectively the findings indicate that the adoption of a particular pricing strategy is associated with the financial condition of the contractor as reflected in measures of risk, asset utilization and organizational slack. Keywords: Finan...

  15. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  16. 75 FR 78755 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-12-16

    ... Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to... products requiring federal contractor certification as to the use of forced or indentured child labor. To.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  17. 77 FR 59418 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-09-27

    ... of products requiring federal contractor certification as to the use of forced or indentured child... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  18. 76 FR 61384 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-10-04

    ... Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  19. 40 CFR 35.938-6 - Progress payments to contractors.

    Science.gov (United States)

    2010-07-01

    ... on nor diverted to another job; and (iii) A fabrication period of more than 6 months is anticipated...: (i) A first payment upon submission by the prime contractor of shop drawings for the equipment or...

  20. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 455 [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This proposed rule would provide guidance to...

  1. Comparative Study On The Ethical Perceptions Of Contractors And Designers In The China Construction Industry

    Science.gov (United States)

    Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian

    2017-12-01

    Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.

  2. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Science.gov (United States)

    2010-10-01

    ...-by-case basis. If the time period expired due to negligence by the contractor, DOE may grant a... to avoid such negligence in the future. If a contractor is requesting an extension of time in which... Law 101-189, section 3133(d), and the DOE owned facility is involved in weapons related research and...

  3. Global petroleum fiscal systems compared by contractor take

    International Nuclear Information System (INIS)

    Johnston, D.

    1994-01-01

    Petroleum fiscal terms in most countries are tougher than in the US, but these countries have more geological potential and still may be economically attractive. The market for exploration capital and technology is super competitive and getting more sophisticated. Governments are increasingly aware of the global market for exploration acreage or rehabilitation projects. For many oil companies, an important part of the negotiations is to secure terms acceptable to the potential partner. Knowing the market and what terms are realistic depends on a region's potential and other factors. Most countries developing petroleum fiscal systems are opting for the production sharing contract (PSC). This trend began in the 1960s. Now, nearly half of the countries with petroleum potential have a system based on the PSC. However, financial results could be the same in a royalty/tax arrangement. Economics depend primarily on division of profits or what is known as government/contractor take. The paper discusses contractor take, estimating take, Indonesian split, and take implications

  4. 75 FR 42164 - Notice of Final Determination Updating the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-07-20

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Guidelines for Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  5. A Novel Approach to Selecting Contractor in Agent-based Multi-sensor Battlefield Reconnaissance Simulation

    Directory of Open Access Journals (Sweden)

    Xiong Li

    2012-11-01

    Full Text Available This paper presents a novel approach towards showing how contractor in agent-based simulation for complex warfare system such as multi-sensor battlefield reconnaissance system can be selected in Contract Net Protocol (CNP with high efficiency. We first analyze agent and agent-based simulation framework, CNP and collaborators, and present agents interaction chain used to actualize CNP and establish agents trust network. We then obtain contractor's importance weight and dynamic trust by presenting fuzzy similarity-based algorithm and trust modifying algorithm, thus we propose contractor selecting approach based on maximum dynamic integrative trust. We validate the feasibility and capability of this approach by implementing simulation, analyzing compared results and checking the model.

  6. Impact of Extending Sexual Orientation and Gender Identity Nondiscrimination Requirements to Federal Contractors

    OpenAIRE

    Badgett, M.V. Lee

    2012-01-01

    A federal executive order that would require contractors to prohibit discrimination based on sexual orientation and gender identity would protect up to 16.5 million more workers than are already protected by state or private anti-discrimination policies. Currently, state laws or private voluntary policies already protect 61% of federal contractor employees from sexual orientation discrimination and 41% from gender identity discrimination. Research also suggests an executive order would not di...

  7. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  8. Measurement and evaluation of the public administration performance through delivery of electronic services

    Directory of Open Access Journals (Sweden)

    Mirlinda Batalli

    2015-07-01

    Full Text Available The purpose of this paper concerns the relation between delivery of electronic services (e-services and evaluation of public administration performance. Public sector organizations should pay attention and determine the strategies to be followed in order to increase the satisfaction of citizens and businesses in relation to delivery of electronic services. The study aims to review the demands toward progress to the competitiveness, the sustainability, efficiency and effectives in public administration that have rapidly enforced the wide reforms in the public sector, in order to modernize the initiatives to offer better electronic services for the citizens. The article aims to present that the transformation process toward providing electronic services to the citizens should be assessed continuously, in light with challenges, demands and process of globalization, in order to strengthen the capacities of public administration and make it more efficient. In this regard, the regular evaluation and measurement of the public administration performance leads toward the promotion of enhanced public services and higher level of accountability. Through receiving the e-services, citizens can save their time, can reduce the expenses and create an easier access of communication with all levels of the government.

  9. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  10. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    Energy Technology Data Exchange (ETDEWEB)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    2014-07-01

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

  11. Program Evaluation: A Consumer Evaluation of Alternative Contractor Concepts in Government Food Service

    Science.gov (United States)

    1974-09-01

    food service facilities. The food factors (quality, variety, and quantity, in that order) were generally rated by consumers as most serious problems, in keeping with many previous survey studies of military food service system. The contractor food service concept with raw food provided by the contractor, as exemplified by Fort Myer, significantly reduced consumer problems in food service personnel, speed, hours, environment, and convenience of location, and also reduced the degree to which food variety,

  12. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Science.gov (United States)

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  13. 48 CFR 919.7006 - Incentives for DOE contractor participation.

    Science.gov (United States)

    2010-10-01

    ... disadvantaged businesses, women-owned small businesses, HBCUs, other minority institutions of higher learning... contractor participation. 919.7006 Section 919.7006 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919...

  14. Is Late or Non-Payment a Significant Problem to Malaysian Contractors?

    Directory of Open Access Journals (Sweden)

    M.E. Che Munaaim

    2007-12-01

    Full Text Available Some developed countries have drawn lip construction-specific statutory security of payment acts/legislations typically known as Construction Contracts Act to eliminate poor payment practices and to assist continuous uninterrupted construction works. Malaysia too cannot pretend not to have these problems. This paper presents findings of a study conducted amongst Malaysian contractors with the aims to determine the seriousness of late and non- payment problems; to identify the main causes and effects of late and non-payment; and to identify ways to sustain the payment flows in the Malaysian construction industry. The study focused on contractual payments from the paymaster (government or private to the contractors. The main factors for late and nonpayment in the construction industry identified from the study include: delay in certification, paymaster's poor financial management, local culture/attitude, pay master's failure to implement good governance in business, underpayment of certified amounts by the pay master and the use of 'pay when paid' clauses in contracts. The research findings show that late and non-payment can create cash flow problems, stress and financial hardship on the contractors. Amongst the most appropriate solutions to overcome the problem of late and non-payment faced by local contractors include: a right to regular periodic payment, a right to a defined time frame (or payment and a right to a speedy dispute resolution mechanism. Promptness of submitting, processing, issuing interim payment certificates and honouring the certificates are extremely important issues in relation to progress payment claims. Perhaps, an increased sense of professionalism in construction industry could overcome some of the problems related to late and non- payment issues.

  15. A strategic management model for evaluation of health, safety and environmental performance.

    Science.gov (United States)

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  16. Preaward Evaluation and Responsibility Determination of Foreign Contractors.

    Science.gov (United States)

    1988-12-01

    3 Contractor Country Contract Number Bundesamt Fuer Wehrtechnik FRG DAJA3786C0326 Bundesamt Fuer Wehrtechnik FRG F6154686D0022 Construcciones ...Aeronauticas SA Spain F0960385C0006 Construcciones Aeronauticas SA Spain F4260086C6464 Daimler Benz AG FRG DAJA3778GOO11 Eaton Corp. FRG F0960382D0663

  17. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  18. Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works

    Directory of Open Access Journals (Sweden)

    Loanata V.R.

    2010-01-01

    Full Text Available A construction project comprises of a number of work packages, which are subjected to delays. These delays may be caused by many on-site factors. The aim of this research is to represent owner and contractors perceptions towards delay factors that frequently occur in structural and finishing works. Data for analysis were gathered by distributing questionnaire. A total of 198 sets of questionnaire were gathered and used for subsequent analyses. In general, design changes during construction are perceived by respondents as the most frequent factor to cause delay in all structural and finishing works. The results also show that there are a number of differences between owner’s and contractor’s perceptions towards the occurrences of the factors. Whilst most contractors concern that information factors related to project design and scope frequently causing delays in construction works, owners consider many contractor originated factors, as most frequent delay causes.

  19. Nuclear criticality safety training: guidelines for DOE contractors

    International Nuclear Information System (INIS)

    Crowell, M.R.

    1983-09-01

    The DOE Order 5480.1A, Chapter V, Safety of Nuclear Facilities, establishes safety procedures and requirements for DOE nuclear facilities. This guide has been developed as an aid to implementing the Chapter V requirements pertaining to nuclear criticality safety training. The guide outlines relevant conceptual knowledge and demonstrated good practices in job performance. It addresses training program operations requirements in the areas of employee evaluations, employee training records, training program evaluations, and training program records. It also suggests appropriate feedback mechanisms for criticality safety training program improvement. The emphasis is on academic rather than hands-on training. This allows a decoupling of these guidelines from specific facilities. It would be unrealistic to dictate a universal program of training because of the wide variation of operations, levels of experience, and work environments among DOE contractors and facilities. Hence, these guidelines do not address the actual implementation of a nuclear criticality safety training program, but rather they outline the general characteristics that should be included

  20. A Management Case Analysis of the Department of Defense Contractor Risk Assessment Guide Program

    Science.gov (United States)

    1990-12-01

    ORGANIZATION ......... 17 1. Past Government Organization Problems... 17 2. Current Government Organization ......... 17 3. The Contractor’s Organizatin ...Program and urged CODSIA to take a leadership role in encouraging its members to participate. The DCAA [Ref ll:p. 45] informed defense contractors in...conferences, and through the leadership of officials including the Under Secretary of the Navy for Acquisition, DOD Comptroller General, DOD Inspector General

  1. Environmental Management Performance Report to DOE-RL June 2002

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of the end of June 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing acceptable performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  2. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    Science.gov (United States)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  3. Locational Factors and Foreign Market-entry Considerations for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    A.R Abdul_Aziz

    2012-11-01

    Full Text Available Past studies on contractor internationalisation adopt a unimodelapproach. Taking up the call of a few scholars, a study isconducted, this time by integrating several extant models of fi rminternationalisation. Malaysian international contractors are usedto test this approach. Due to space limitation, this paper is focusedonly on locational factors. It begins by justifying the inclusion oflocational factors in a multi-model approach. Then it posits thatlocational disadvantage is a more intellectually appealing conceptthan locational advantages. Empirically, it shows that the surveyedcontractors evaluate a wide range of factors before making thego/no go decision to enter foreign markets. It also shows thatpsychic distance was not their major concern. Finally, the locationaldisadvantages create a market space for international contractorswith the tenacity to overcome them, which the sampled populationpossessed.

  4. TECHNICAL AND ECONOMICAL ANALYSIS OF LOGGING CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Abilio Donizetti de Morais Filho

    2009-09-01

    Full Text Available The objective of this study was to describe the financial conditions of forestry contractors, concerning life quality aspects, condition of work and equipments, operational costs, and economic credit to invest in new technologies. Five companies had been analyzed, with an annual income between US$ 400,000.00 and US$ 1,720,000.00, with an average of US$ 950,000.00. The number of employees varied between 33 and 181, and the companies were classified in terms of size as: one small, two average, and two big. The main difficulties to invest in new machines were high financial taxes, more than 12% an year, and a lack of long term contracts to guarantee the payment capability. It was observed that the contractors did not consider the capital remuneration and a correct depreciation of machines, resulting in an average machine life higher than 10 years. The final conclusions were that the costs were above the paid values for the services, when computed the depreciation and capital remuneration, with negative results in the financial analyzes of three companies. Finally, the mechanization process increased the workers life quality, however, the annual income was around US$ 2,112.00 per worker, approximately 39% lower than the average Brazilian population.

  5. The selection of construction sub-contractors using the fuzzy sets theory

    International Nuclear Information System (INIS)

    Krzemiński, Michał

    2015-01-01

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable

  6. Comparing Performance of Government and Private Clients in Construction Projects: Contractors’ Perspective

    OpenAIRE

    Jati Utomo Dwi Hatmoko; Riqi Radian Khasania

    2016-01-01

    By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision making, management skills, supports for contractor, and client’s attitude. Data were collected through questionnaire surveys filled in by 117 respo...

  7. Assessing the readiness of contractors in implementing low carbon ...

    African Journals Online (AJOL)

    For the implementation of low carbon construction in our construction industry, the contractors need to be ready and have knowledge to adopt low carbon construction ... A checklist was established by summarizing the highest low carbon activities from each category which were sustainable site planning and management, ...

  8. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Science.gov (United States)

    2013-02-21

    ... include a recommendation by the SDC as to a proposed course of action; (2) The debarment decision-making... proposed debarment; (3) The suspension decision-making process, which shall afford the contractor (and any... Management, Contracting; Attention: Contracting Policy, 1900 E Street NW., Washington, DC 20415; or email...

  9. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Science.gov (United States)

    2010-01-25

    ... Part II The President Memorandum of January 20, 2010--Addressing Tax Delinquency by Government... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contracts are awarded to tens of thousands of companies with serious tax delinquencies. The total amount in...

  10. The operation of contractors on nuclear sites: French regulations

    International Nuclear Information System (INIS)

    Mayoux, J.C.; Derche, B.

    1985-01-01

    The first purpose of this paper is to show how the French common law -as it results from the code of labour and holdings of the courts- deals with the intervention of contractors. The second part analyses the special regulations in force to ensure radiation protection [fr

  11. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  12. Agencies Need Improved Financial Data Reporting for Private Security Contractors

    National Research Council Canada - National Science Library

    Warren, David R; Bianco, Michael A; Nasser, Waheed; Kusman, Richard R; Shafer, James; Venner, Jason; Walls, Lovell Q; Wright, Samson J

    2008-01-01

    Section 842 of the National Defense Authorization Act of 2008 (Public Law 110-181), required SIGIR to, among other things, develop a plan to evaluate various characteristics of contracting for private security contractor services in Iraq...

  13. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  14. 9 CFR 201.94 - Information as to business; furnishing of by packers, swine contractors, live poultry dealers...

    Science.gov (United States)

    2010-01-01

    ... of by packers, swine contractors, live poultry dealers, stockyard owners, market agencies, and... poultry dealers, stockyard owners, market agencies, and dealers. Each packer, swine contractor, live poultry dealer, stockyard owner, market agency, and dealer, upon proper request, shall give to the...

  15. Bretylium potentiation of the contractor responses of isolated rabbit aortic strips to potassium and tyramine.

    Science.gov (United States)

    Kurahashi, K; Shibata, S

    1971-09-01

    1. Pretreatment of rabbit aortic strips with bretylium potentiated the contractor response to potassium and tyramine but not to noradrenaline. On the other hand, such pretreatment inhibited the response to nicotine.2. Even in reserpinized or cold stored aortic strips, pretreatment with bretylium enhanced the contractor response to potassium and tyramine.3. Pretreatment of fresh, reserpinized, or cold stored aortic strips with pheniprazine potentiated the contractor response to potassium and tyramine.4. Pretreatment of aortic strips with bretylium or pheniprazine did not potentiate the response to 5-hydroxytryptamine (5-HT).5. The results indicate that both bretylium and pheniprazine potentiate the action of tyramine and potassium, not by presynaptic mechanisms, but by postsynaptic action, causing an increase in the sensitivity of the effector cells to the stimulants.

  16. 24 CFR 1000.44 - What prohibitions on the use of debarred, suspended, or ineligible contractors apply?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What prohibitions on the use of debarred, suspended, or ineligible contractors apply? 1000.44 Section 1000.44 Housing and Urban Development... § 1000.44 What prohibitions on the use of debarred, suspended, or ineligible contractors apply? In...

  17. South African Private Security Contractors Active in Armed Conflicts ...

    African Journals Online (AJOL)

    Not only is this legislation completely unique, but it appears wholly at odds with international opinion. In this article we place private security contractors (PSCs) under the microscope of international law, exploring the role they play in armed conflicts, and the status afforded them by international humanitarian law (IHL).

  18. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  19. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  20. Radiation exposures for DOE and DOE contractor employees Eighteenth annual report, 1985

    International Nuclear Information System (INIS)

    1986-12-01

    All US Department of Energy (DOE) and DOE contractors are required to submit occupational radiation exposure records to a central repository. The data required include a summary of whole-body exposures to ionizing radiation, a summary of internal depositions of radioactive materials above specified limits, and occupational exposure reports for terminating employees. This report is a summary of the data submitted by DOE and DOE contractors for 1985. A total of 95,806 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1985. In addition to the employees, 96,665 visitors were monitored. Of all employees monitored, 58.4% received a dose equivalent that was less than measurable, 39.8% a measurable exposure less than 1 rem, and 1.9% an exposure greater than 1 rem. One employee received a dose equivalent greater than 5 rem (8.66 rem). The exposure received by 91.9% of the visitors to DOE facilities was less than measurable. No visitors received a dose equivalent greater than 2 rem. The collective dose equivalent for DOE and DOE contractor employees was 8223 person-rem. The collective dose equivalent for visitors was 461 person-rem. These averages are significantly less than the DOE 5-rem/year radiation protection standard for whole-body exposures. Ten new cases of internal depositions were reported in 1985 that exceeded 50% of the pertinent annual dose-equivalent standard. Of these ten cases, eight occurred in a previous year and are reported now because recent revisions in the dose calculations established these cases as reportable depositions. Twenty-six cases reported during 1985 were considered to be the continued tracking of previous depositions. 5 figs., 32 tabs

  1. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    National Research Council Canada - National Science Library

    Elsea, Jennifer K; Serafino, Nina M

    2007-01-01

    .... From the information available in published sources, this apparently is the first time that the United States has depended on contractors to provide such extensive security in a hostile environment...

  2. Politics, Administration and Performance: A continuing search, but no one best way?

    NARCIS (Netherlands)

    Ch. Pollitt (Christopher)

    2012-01-01

    textabstractIntroduction: I have been tasked with the following question: how do relations between politics and administration shift when performance-improving reforms are introduced? As always, there is more than one way of interpreting the question, and of trying to answer. There are also strong

  3. 29 CFR 471.15 - Under what circumstances must a contractor be provided the opportunity for a hearing?

    Science.gov (United States)

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances must a contractor be provided the...

  4. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Science.gov (United States)

    2010-07-01

    ... treatment works owner, the applicant, its engineers, contractors, equipment manufacturers or suppliers; (b) The RBC failure has significantly increased the project's capital or operation and maintenance costs; (c) The modification/replacement project meets all requirements of EPA's construction grant and other...

  5. The acute effects of MDMA and ethanol administration on electrophysiological correlates of performance monitoring in healthy volunteers.

    Science.gov (United States)

    Spronk, D B; Dumont, G J H; Verkes, R J; De Bruijn, E R A

    2014-07-01

    Knowing how commonly used drugs affect performance monitoring is of great importance, because drug use is often associated with compromised behavioral control. Two of the most commonly used recreational drugs in the western world, 3,4-methylenedioxymethamphetamine (MDMA or "ecstasy") and ethanol (alcohol), are also often used in combination. The error-related negativity (ERN), correct-related negativity (CRN), and N2 are electrophysiological indices of performance monitoring. The present study aimed to investigate how ethanol, MDMA, and their co-administration affect performance monitoring as indexed by the electrophysiological correlates. Behavioral and EEG data were obtained from 14 healthy volunteers during execution of a speeded choice-reaction-time task after administration of ethanol, MDMA, and combined ethanol and MDMA, in a double-blind, placebo-controlled, randomized crossover design. Ethanol significantly reduced ERN amplitudes, while administration of MDMA did not affect the ERN. Co-administration of MDMA and ethanol did not further impair nor ameliorate the effect of ethanol alone. No drug effects on CRN nor N2 were observed. A decreased ERN following ethanol administration is in line with previous work and offers further support for the impairing effects of alcohol intoxication on performance monitoring. This impairment may underlie maladaptive behavior in people who are under influence. Moreover, these data demonstrate for the first time that MDMA does not affect performance monitoring nor does it interact with ethanol in this process. These findings corroborate the notion that MDMA leaves central executive functions relatively unaffected.

  6. 77 FR 197 - Federal Acquisition Regulation; Public Access to the Federal Awardee Performance and Integrity...

    Science.gov (United States)

    2012-01-03

    ... will soon be able to evaluate the business ethics and quality of potential contractor clients... public the data in FAPIIS will benefit contractors with records of business integrity and performance... and authorized users performing business on behalf of the Government will be able to view the...

  7. 48 CFR 622.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor. (e) The... manufacture an end product furnished pursuant to a contract awarded subject to the certification required in...

  8. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    National Research Council Canada - National Science Library

    Elsea, Jennifer K; Schwartz, Moshe; Nakamura, Kennon H

    2008-01-01

    .... In Iraq, private firms known as Private Security Contractors (PSCs) serve to protect individuals, transport convoys, forward operating bases, buildings, and other economic infrastructure, and are training Iraqi police and military personnel...

  9. Prolonged administration of recombinant human erythropoietin increases submaximal performance more than maximal aerobic capacity

    DEFF Research Database (Denmark)

    Thomsen, J J; Rentsch, R L; Robach, P

    2007-01-01

    HuEpo treatment VO2max increased (Ptime-to-exhaustion (80% VO2max) was increased by 54.0 and 54.3% (Ptime point...... week 11), TTE was decreased by 26.8% as compared to pre rHuEpo administration. In conclusion, in healthy non-athlete subjects rHuEpo administration prolongs submaximal exercise performance by about 54% independently of the approximately 12% increase in VO2max....

  10. 42 CFR 455.232 - Medicaid integrity audit program contractor functions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Medicaid integrity audit program contractor functions. 455.232 Section 455.232 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PROGRAM INTEGRITY: MEDICAID Medicaid...

  11. Contractor-Client Communications Checklist for Spray Polyurethane Foam (SPF), Incluyendo la Versión de Español

    Science.gov (United States)

    This checklist provides professional contractors and clients topics to discuss so that the client understands what to expect when a professional contractor installs SPF insulation. Lista de verificación de comunicación del contratista y el cliente.

  12. Stirling convertor performance mapping test results

    Science.gov (United States)

    Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.

    2002-01-01

    The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .

  13. GBI assessment checklist: Level of awareness of the contractors in the Malaysian construction industry

    Science.gov (United States)

    Marhani, M. A.; Muksain, M. A. S.

    2018-02-01

    Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.

  14. Technical Baseline Summary Description for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    TEDESCHI, A.R.

    2000-01-01

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford

  15. Fourteenth annual report radiation exposures for DOE and DOE contractor employees - 1981

    International Nuclear Information System (INIS)

    1983-03-01

    All Department of Energy (DOE) and DOE contractors are required by DOE Order 5484.1, Chapter IV, to submit occupational exposure records to a central repository. The data required includes a summary of whole-body exposures to ionizing radiation, a summary of internal depositions of radioactive materials above specified limits, and occupational exposure reports for terminating employees. This report is a summary of the data submitted by DOE and DOE contractors for 1981. A total of 82,873 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1981. In addition to the employees, 84,343 visitors were monitored. Of all employees monitored, 54.43% received a dose equivalent that was less than measurable, 44.04% a measurable exposure less than 1 rem, and 1.53% an exposure granter than 1 rem. the exposure received by 88.14% of the visitors to DOE facilities was less than measurable. Only 11.85% of the visitors received a measurable exposure less than 1 rem, and 0.0% of the visitors received an exposure greater than 1 rem. No employees or visitors received a dose equivalent greater than 5 rem. The collective dose equivalent for DOE and DOE contractors employees was 6,902 person-rem. The collective dose equivalent for visitors was 579 person-rem. The total dose equivalent for employees and visitors combined was 7,481 person-rem. The average dose equivalent for all individuals (employees and visitors) monitored was 45 mrem and the average dose equivalent for all individuals who received a measurable exposure was 157 mrem. The highest average dose equivalent was observed for employees monitored at fuel processing facilities (342 mrem) and the lowest among visitors (7 mrem) to DOE facilities. These averages are significantly less than the DOE 5-rem/year radiation protection standard for whole-body exposures

  16. The Organizational Justice of the Administrative Leaders and its Impact on Employees' Career Performance

    Directory of Open Access Journals (Sweden)

    Zaid Yaseen Saud Al-Dulaimi

    2017-03-01

    • What is level of work or Career Performance of employees from the point of view of their leaders? The study's society is formed from administrative leaders, heads of departments and discussed faculties. Researchers will use a questionnaire for data collection and it will include, the responder's demographic information, the measuring tool for the Organizational Justice practiced by the administrative leaders, the measurement of Career Performance of their employees. Study Tools has been verified by bringing it to the attention of the arbitrators of jurisdiction, and verification of the appropriateness of using the test method and the test. For answering the questions of the study researchers will use arithmetic averages, standard deviations and Pearson Linklabs.

  17. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Science.gov (United States)

    2010-10-01

    ... affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right... benefits are, to the extent permitted by law or Government regulations, available to the public on... rights—(1) Assignment to the Government. Except to the extent that rights are retained by the Contractor...

  18. 75 FR 57963 - Draft Guidance for Industry and Food and Drug Administration Staff; Establishing the Performance...

    Science.gov (United States)

    2010-09-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0459] Draft Guidance for Industry and Food and Drug Administration Staff; Establishing the Performance Characteristics of In Vitro Diagnostic Devices for the Detection of Helicobacter pylori; Availability AGENCY: Food...

  19. 48 CFR 2936.604 - Performance evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor... reports must be made using Standard Form 1421, Performance Evaluation (Architect-Engineer) as prescribed...

  20. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification of...

  1. Personality and Student Performance on Evaluation Methods Used in Business Administration Courses

    Science.gov (United States)

    Lakhal, Sawsen; Sévigny, Serge; Frenette, Éric

    2015-01-01

    The objective of this study was to verify whether personality (Big Five model) influences performance on the evaluation methods used in business administration courses. A sample of 169 students enrolled in two compulsory undergraduate business courses responded to an online questionnaire. As it is difficult within the same course to assess…

  2. Environmental monitoring at major U.S. Energy Research and Development Administration contractor sites: calendar year 1975. Volume 2

    International Nuclear Information System (INIS)

    1976-08-01

    This report describes environmental monitoring conducted during 1975 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, soil, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Shippingport Atomic Power Station during 1975. The Beaver Valley Power Station was under construction during the report year, and therefore, made no radioactive releases. Additional analyses of the effluent from the reactor portion of Shippingport were performed to ensure that the water quality standards specified by Energy Research and Development Administration Manual Chapter 0510 and the Commonwealth of Pennsylvania have been met. The results of environmental monitoring described by this report show that Shippingport operations and the pre-operational phase of the Beaver Valley Power Station have not adversely affected the surrounding environment

  3. Radiation exposures for DOE and DOE contractor employees, 1987

    International Nuclear Information System (INIS)

    1989-10-01

    This report is one of series of annual reports provided by the US Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year, as well as identification of trends in exposures being experienced over the years. 5 figs., 30 tabs

  4. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional Use...

  5. Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine

    Directory of Open Access Journals (Sweden)

    Sherif Mohamed

    2006-12-01

    Full Text Available The construction industry has unique characteristics that sharply distinguish it from other sectors of the economy. It is fragmented, very sensitive to the economic cycles and political environment, and has a significantly high rate of business failure. Business failure, collapse and bankruptcy are common terms in the industry due to the many risks inherited in how the industry operates. Throughout the world, the relative ease of entry gives rise to a large number of contracting firms competing fiercely in the market exposing many of them to business failure, Palestine is no exception. The objectives of this paper are to report on a research study which aims at exploring the causes of contractor's business failure in Palestine, and investigating their severity from the contractor's point of view. The study's results shows that the main causes of business failure are delay in collecting debt from clients (donors, border closure, heavy dependence on bank loans and payment of high interest on these loans, lack of capital, absence of industry regulations, low profit margin due to high competition, awarding contracts by client to the lowest bidder, and lack of experience in contract management. Based on these findings, recommendations to the Palestinian National Authority (PNA and local contractors are presented in this paper.

  6. Business administration postgraduates’ authentic task performance in the transition from university to work

    NARCIS (Netherlands)

    Bijker, Monique; Van der Klink, Marcel; Boshuizen, Els

    2012-01-01

    Bijker, M. M., Van der Klink, M. R., & Boshuizen, H. P. A. (2012). Business administration postgraduates’ authentic task performance in the transition from university to work. Paper presented at the EARLI-SIG14 Conference August 22-24, Antwerp, Belgium.

  7. Hand in Glove? Small Building Contractors, Mobile Technology and Innovation

    DEFF Research Database (Denmark)

    Buser, Martine; Koch, Christian; Tambo, Torben

    2010-01-01

    for construction are developing as well. A recent review shows a small portfolio of systems using mobile computing to support specifically the construction project processes. The aim of this paper is to evaluate the use of mobile computing at small construction contractors. The paper presents a quantitative...

  8. A performance incentive contract that pays off for all parties

    International Nuclear Information System (INIS)

    Krummrich, C.R.; Johnston, R.E.; Crist, T.W.

    1995-01-01

    The Western Business Unit Bakersfield drilling department of Chevron, U.S.A. Production Company developed a drilling performance incentive contract that was implemented during 1994 in the Lost Hills field of California. The performance incentive contract (PIC) financially rewarded all of the drilling contractor's rig employees for outperforming pre-established drilling performance goals. The key elements of the performance incentive program are: (1) Goals that rigger incentives are based on cost categories that are controllable by the drilling team; (2) Goals were established using a database of past years performance; (3) Goals that are not achieved negatively impact the incentive earned in an effort to deter repeated errors; (4) Accidents that occur on the job negatively impact the incentive earned; (5) Administration of the program is not time consuming. The results of using an incentive contract in the Lost Hills drilling program are: (1) Time and cost of operations are reduced; (2) The results are measurable and repeatable; (3) A team environment develops in which ideas are shared and acted upon by crew members and supervisory personnel

  9. An fMRI study on variation of visuospatial cognitive performance of young male due to highly concentrated oxygen administration

    Science.gov (United States)

    Chung, Soon Cheol; Kim, Ik Hyeon; Tack, Gye Rae; Sohn, Jin Hun

    2004-04-01

    This study investigated the effects of 30% oxygen administration on the visuospatial cognitive performance using fMRI. Eight college students (right-handed, average age 23.5) were selected as subjects for this study. Oxygen supply equipment which gives 21% and 30% oxygen at a constant rate of 8L/min was developed for this study. To measure the performance of visuospatial cognition, two questionnaires with similar difficulty containing 20 questions each were also developed. Experiment was designed as two runs: run for visuospatial cognition test with normal air (21% of oxygen) and run for visuospatial cognition test with highly concentrated air (30% of oxygen). Run consists of 4 blocks and each block has 8 control problems and 5 visuospatial problems. Functional brain images were taken from 3T MRI using single-shot EPI method. Activities of neural network due to performing visuospatial cognition test were identified using subtraction procedure, and activation areas while performing visuospatial cognition test were extracted using double subtraction procedure. Activities were observed at occipital lobe, parietal lobe, and frontal lobe when performing visuospatial cognition test following both 21% and 30% oxygen administration. But in case of only 30% oxygen administration there were more activities at left precuneus, left cuneus, right postcentral gyrus, bilateral middle frontal gyri, right inferior frontal gyrus, left superior frontal gyrus, bilateral uvula, bilateral pyramis, and nodule compared with 21% oxygen administration. From results of visuospatial cognition test, accuracy rate increased in case of 30% oxygen administration. Thus it could be concluded that highly concentrated oxygen administration has positive effects on the visuospatial cognitive performance.

  10. The factors impacted to local contractor from Foreign Direct Investment in advancing economic hub development in Iskandar Malaysia

    Science.gov (United States)

    Syafiq Salim, Muhamad; Zakaria, Rozana; Aminuddin, Eeydzah; Hamid, Abdul Rahim Abdul; Abdullah, Redzuan; Shahzaib Khan, Jam

    2018-04-01

    Iskandar Malaysia is an advanced economic hub which is rapidly growing in the State of Johor. It has been an attractive place for Foreign Direct Investment (FDI) to invest. Many sectors are affected by the presence of FDI including the construction sector. This paper highlights the investigation on the effects of FDI to the local contractor in the Iskandar Malaysia Development. In this study, a questionnaire survey was carried out to gain the information on problems from internal factors and external factors that caused the limitation on involvement in FDI project by local contractors. 73 numbers of local contractor registered under CIDB in class G5, G6 and G7 are the respondents. Frequency analysis and Average Index Analysis are used for the results. This study provides the factors that impacted local construction players in Iskandar Malaysia Development. This study has portrayed that FDI plays a vital and significant role in spearheading the active involvement of local contractors in an urban sustainable development.

  11. Optimizing the Time Performance of Subcontractors in Building Projects

    Directory of Open Access Journals (Sweden)

    Andy K.W Ng

    2010-07-01

    Full Text Available The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.

  12. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Hack, W.L.

    1995-01-01

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  13. 7th Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    Science.gov (United States)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership' provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processess, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission. The conference was highlighted by the announcement of the first recipients of the George M. Low Trophy: NASA's Quality and Excellence Award. My congratulations go out to all nine finalist organizations and to the two recipients of this prestigious honor: Rockwell Space Systems Division and Marotta Scientific Controls, Inc. (the first small business to achieve this honor). These organizations have demonstrated a commitment to quality that is unsurpassed in the aerospace industry. This report summarizes the presentations and is not intended to be a verbatim proceedings document. You are encouraged to contact the speakers with any requests for further information.

  14. Principals' Administrative Styles and Students' Academic Performance in Taraba State Secondary Schools, Nigeria

    Science.gov (United States)

    Bello, Suleiman; Ibi, Mustapha Baba; Bukar, Ibrahim Bulama

    2016-01-01

    The study determined the relationship between principals' administrative styles and students' academic performance in Taraba State secondary schools, Nigeria. The objectives of the study were to determine the relationships between initiative structure of leadership styles, consideration structure of leadership styles, participatory structure of…

  15. In ovo administration of copper nanoparticles and copper sulfate positively influences chicken performance

    DEFF Research Database (Denmark)

    Mroczek-Sosnowska, Natalia; Łukasiewicz, Monika; Wnuk, Agnieszka

    2016-01-01

    BACKGROUND: Copper (Cu) is a key trace mineral involved in a variety of physiological processes, and is commonly used in poultry production. However, regardless of the inclusion level the majority of Cu is excreted with poultry faeces. We hypothesise that in ovo administration will allow for better...... utilisation of Cu during embryo development than when supplied post-natally with feed to growing chickens. Thus, the objective of this study was to evaluate effects of in ovo administration of NanoCu and copper sulfate (CuSO4 ) on broiler chicken performance. RESULTS: The study showed the positive influences...

  16. A Contingency View of the Strategies of Sustainable Development and Disclosure: Study of ENR's Top 10 Contractors

    Science.gov (United States)

    Ho, Shih Ping; Yu, Chong Yang; Hsu, Yaowen

    2017-04-01

    More and more international firms in the A/E/C (Architecture/Engineering/ Construction) industries voluntarily invest in sustainable development and disclose their efforts publicly. Especially, the sustainable development efforts of the firms in Construction industry draw more attentions from the public, compared to that in A/E industries. There are various reporting systems in practice for reporting the performance of a firm's development on sustainability. The most well known reporting systems include Global Reporting Initiative (GRI), United Nations Global Compact (UNGC), and the AA1000 Accountability Principal Standards. However, most of these reporting systems are very complicated in terms of the performance indices and the categories and subcategories of these indices. It is impossible and also unnecessary for a firm to be evaluated on all the indices. However, it is also not clear on what indices are more important for a firm than other indices and why. The more fundamental questions are "what sustainable development efforts contribute more to a particular firm's competitive advantages and why?" In this research, we studied the world's top 10 contractors in ENR (Engineering News Records). We analyzed how these contractors disclose their efforts and performance in sustainable development and, most importantly, why. Lastly, based on the insights obtained from the analysis, we developed a contingency view of sustainable development and disclosure strategies. This strategic framework can be further examined from the perspective of firms' competitive advantages and give implications to how a firm's top managers should implement the firm's sustainable development program.

  17. Construction contractors and healthcare delivery in South Africa: challenges and interventions

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2007-10-01

    Full Text Available This paper compares the demand side requirements of the National Department of Health with the supply-side capabilities of the construction industry as determined by the Register of Contractors. It finds that only a small percentage of registered...

  18. Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor

    International Nuclear Information System (INIS)

    DIEDIKER, J.A.

    2000-01-01

    The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission

  19. Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor

    Energy Technology Data Exchange (ETDEWEB)

    DIEDIKER, J.A.

    2000-04-22

    The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission.

  20. 48 CFR 1352.271-76 - Performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...

  1. Risk analysis in the management of urban construction projects from the perspective of the employer and the contractor

    Directory of Open Access Journals (Sweden)

    Mohammad Taghipour

    2015-12-01

    Full Text Available Imbalance between anticipated and actual progress in the development of urban construction projects suggests that there are many obstacles and risks which not only causes the urban management be unsustainable, but the reconstruction and development of urban space is also seriously threatened. In this study, the library research on issues related to the risk of construction projects was done, then some interviews were conducted with experts and managers informed and involved in the projects, and finally questionnaires were distributed to identify and classify the impact of the risks of the implementation of the construction projects. After analyzing the data, the results indicated that the experts listed the most significant risks as the delays in the payment of contractors' claims and statements due to the lack of handling financial instruments, the governance of relationships rather than rules in the tenders resulting from employer actions, low commitment to the quality of work provided by their subcontractors, failure to complete the detail engineering by foreign contractors on time, weaknesses in contractors' financial resources, and offering lower prices than reasonable by contractors to win the tender. All of these require special attention and other kinds of risks are important at the next level. Finally, the solutions for eliminating or reducing risks in high-risk areas have been offered to provide tranquility for contractors and employers.

  2. Professional performance evaluation within the Romanian administrative system

    Directory of Open Access Journals (Sweden)

    Cristina MANOLE

    2010-12-01

    Full Text Available The current economic crisis, manifested in the entire world, highlights the need for sustained involvement of the local and regional authorities in each country, in conceiving and implementing Community policies (which already exist at European level having an essential role in implementing the economic plans achievement. This view was shared by all European Union Member States, of which Romania is part, since 2007. Therefore, the economic crisis which is reflected in the Romanian society today, requires prompt and sustained intervention by the authorities in the execution of the economic recovery plan, implying the community strategies, due to sharply budgetary expenses cut, which is found in all European countries. In order to achieve this major objective, the Romanian authorities should have qualified and properly motivated personnel through an adequate remuneration, according to the training, skills, responsibilities and especially individual performance obtained at each position, as it happens in most developed countries of the European Union. In this context, this study approaches the issues related to the performance evaluation of the public sector’s employees. Considering the fact that strengthening and developing the human resources segment is a strategic goal of the Romanian administration for the period 2008 - 2013, which will lead to modernizing it and making it more efficient (at both central and local level, the personnel performance evaluation, at the organizational level represents a fundamental activity from the human resources’ management perspective.

  3. Environmental Management Performance Report to DOE-RL December 2001

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of October 31, 2001 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  4. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  5. 48 CFR 245.610-4 - Contractor inventory in foreign countries.

    Science.gov (United States)

    2010-10-01

    ..., DRMS disposal activities shall be used to dispose of surplus contractor inventory located outside the... property covered by this contract will be used in (name of country). In the event of resale or export by... equivalent in other currency at the official exchange rate, the Purchaser agrees to obtain the approval of...

  6. 48 CFR 52.227-11 - Patent Rights-Ownership by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... variety has been reproduced with recognized characteristics. Nonprofit organization means a university or...) Communications. [Complete according to agency instructions.] (k) Subcontracts. (1) The Contractor shall include... international agreements entered into by the Government before or after the effective date of the contract and...

  7. NEURO-FUZZY MODELING APPLIED IN PROGRAM MANAGEMENT TO INCREASE LOCAL PUBLIC ADMINISTRATION PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Adrian-Mihai Zaharia-Radulescu

    2016-07-01

    Full Text Available One of the challenges in local public administration is dealing with an increasing number of competing requests coming from the communities they serve. The traditional approach would be to handle each request as a standalone project and be prioritized according to benefits and budget available. More and more nowadays program management is becoming a standard approach in managing the initiatives of local public administration. Program management approach is itself an enabler for performance in public sector organizations by allowing an organization to better coordinate its efforts and resources in managing a portfolio of projects. This paper aims to present how neuro-fuzzy modeling applied in program management can help an organization to increase its performance. Neuro-fuzzy modeling would lead organizations one step further by allowing them to simulate different scenarios and manage better the risks accompanying their initiatives. The research done by the authors is theoretical and combines knowledge from different areas and a neuro-fuzzy model is proposed and discussed.

  8. Process Performance Measurement for E-Government: A Case Scenario from the German Ministerial Administration

    Directory of Open Access Journals (Sweden)

    Oliver Thomas

    2007-06-01

    Full Text Available During the last years, the realization of the E-Government driven benefits was in the center of interest at various public administrations. The article at hand outlines a process driven approach for the evaluation of technology-based performance impacts. From the German perspective, existing concepts of performance evaluation are concretized for the case scenario of the German Plan Approval Procedures.

  9. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  10. Distinctive research patterns on public sector performance measurement of public administration and accounting disciplines

    NARCIS (Netherlands)

    van Helden, G. Jan; Johnsen, Age; Vakkuri, Jarmo

    2008-01-01

    This article explores distinctive research patterns of public administration and accounting disciplines concerning public sector performance measurement (PSPM). Our review shows that accounting researchers from Europe investigate reasons for limited PM use and factors explaining a rational or

  11. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  12. Shifting Practices in Teacher Performance Evaluation: A Qualitative Examination of Administrator Change Readiness

    Science.gov (United States)

    Spina, Nancy; Buckley, Phillip; Puchner, Laurel

    2014-01-01

    This study examines the perceptions, attitudes and beliefs of administrators and teachers in a Southwestern Illinois School District regarding the recent reforms in teacher performance evaluation. This study uses a qualitative approach and provides data from individual and focus group interviews to determine the extent to which the district is…

  13. Final Report for the Restart of the Waste Characterization, Reduction and Repackaging Facility (WCRRF) Contractor Readiness Assessment (CRA)

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Gregory Mark [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-22

    The Los Alamos National Laboratory (LANL or Laboratory) Contractor Readiness Assessment (CRA) required for restart of the Technical Area (TA) 50 Waste Characterization, Reduction, and Repackaging Facility (WCRRF) for remediated nitrate salt (RNS) waste operations was performed in compliance with the requirements of Department of Energy (DOE) Order (O) 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, and LANL procedure FSD-115-001, Verification of Readiness to Start Up or Restart LANL Nuclear Facilities, Activities, and Operations.

  14. 48 CFR 1852.245-70 - Contractor requests for Government-owned equipment.

    Science.gov (United States)

    2010-10-01

    ... the equipment and the reasons why contractor-owned property cannot be used, citing the applicable FAR... 1419, DOD Industrial Plant Equipment Requisition, or equivalent format, for each item requested and (ii... Government-owned equipment. 1852.245-70 Section 1852.245-70 Federal Acquisition Regulations System NATIONAL...

  15. Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

  16. 48 CFR 1536.201 - Evaluation of contracting performance.

    Science.gov (United States)

    2010-10-01

    ... performance. 1536.201 Section 1536.201 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY... Contracting for Construction 1536.201 Evaluation of contracting performance. (a) The Contracting Officer will... will file the form in the contractor performance evaluation files which it maintains. (e) The Quality...

  17. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    Energy Technology Data Exchange (ETDEWEB)

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  18. 24 CFR 1000.26 - What are the administrative requirements under NAHASDA?

    Science.gov (United States)

    2010-04-01

    ... recipient of a cash escrow of not less than 20 percent of the total contract price, subject to reduction... monitoring of disbursements by the contractor. (12) Section 85.37, “Subgrants.” (13) Section 85.40, “Monitoring and reporting program performance,” except paragraphs (b) through (d) and paragraph (f). (14...

  19. 48 CFR 27.305-2 - Administration by the Government.

    Science.gov (United States)

    2010-10-01

    ... personnel regarding work under the contract involved, observe the work on site, and inspect laboratory notebooks and other records of the contractor related to work under the contract. (e) If a contractor or...

  20. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    Science.gov (United States)

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…