WorldWideScience

Sample records for action work plan

  1. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  2. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  3. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  4. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  5. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  6. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  7. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  8. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  9. The scaup conservation action plan: working toward coherence

    Science.gov (United States)

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  10. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  11. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  12. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  13. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  14. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  15. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  16. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  17. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  18. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  19. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  20. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  1. Removal Action Work Plan for 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Morton, M.R.

    2000-01-01

    This document contains the removal action work plan for the 105-DR and 105-F Reactor buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site, which is owned and operated by the US Department of Energy (DOE), in Benton County, Washington. The 100 Areas (including the 100-D/DR and 100-F Areas) of the Hanford Site were placed on the US Environmental Protection Agency's (EPA's) National Priorities List under the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA). The DOE has determined that hazardous substances in the 105-DR and 105-F Reactor buildings and four ancillary facilities present a potential threat to human health or the environment. The DOE has also determined that a non-time critical removal action is warranted at these facilities. Alternatives for conducting a non-time critical removal action were evaluated in the ''Engineering Evaluation/Cost Analysis for the 105-DR and 105-F Reactor Facilities and Ancillary Facilities'' (DOE-RL 1998a). The engineering evaluation/cost analysis (EE/CA) resulted in the recommendation to decontaminate and demolish the contaminated reactor buildings (except for the reactor blocks) and the ancillary facilities and to construct a safe storage enclosure (SSE) over the reactor blocks. The recommendation was approved in an action memorandum (Ecology et al. 1998) signed by the Washington State Department of Ecology (Ecology), EPA, and DOE. The DOE is the agency responsible for implementing the removal actions in the 105-D/DR and 105-F Areas. Ecology is the lead regulatory agency for facilities in the 100-D/DR Area, and EPA is the lead regulatory agency for facilities in the 100-F Area. The term ''lead regulator agency'' hereinafter, refers to these authorities. This removal action work plan supports implementation of the non-time critical removal action

  2. Action research and Care Work

    DEFF Research Database (Denmark)

    Andersen, John; Bilfeldt, Anette

    The paper is a about planning and empowerment in care work at public nursing homes and the role of action research. It is based on ongoing work in the “Center for Demokratisk Samfundsudvikling og Aktionsforskning” at Roskilde University and the transnational research network KATARSIS, which works...

  3. What are the working mechanisms of a web-based workplace sitting intervention targeting psychosocial factors and action planning?

    Science.gov (United States)

    De Cocker, Katrien; De Bourdeaudhuij, Ilse; Cardon, Greet; Vandelanotte, Corneel

    2017-05-03

    Office workers demonstrate high levels of sitting on workdays. As sitting is positively associated with adverse health risks in adults, a theory-driven web-based computer-tailored intervention to influence workplace sitting, named 'Start to Stand,' was developed. The intervention was found to be effective in reducing self-reported workplace sitting among Flemish employees. The aim of this study was to investigate through which mechanisms the web-based computer-tailored intervention influenced self-reported workplace sitting. Employees (n = 155) participated in a clustered randomised controlled trial and reported socio-demographics (age, gender, education), work-related (hours at work, employment duration), health-related (weight and height, workplace sitting and physical activity) and psychosocial (knowledge, attitudes, self-efficacy, social support, intention regarding (changing) sitting behaviours) variables at baseline and 1-month follow-up. The product-of-coefficients test of MacKinnon based on multiple linear regression analyses was conducted to examine the mediating role of five psychosocial factors (knowledge, attitudes, self-efficacy, social support, intention). The influence of one self-regulation skill (action planning) in the association between the intervention and self-reported workplace sitting time was investigated via moderation analyses. The intervention had a positive influence on knowledge (p = 0.040), but none of the psychosocial variables did mediate the intervention effect on self-reported workplace sitting. Action planning was found to be a significant moderator (p workplace sitting only occurred in the group completing an action plan. Future interventions aimed at reducing employees' workplace sitting are suggested to focus on self-regulatory skills and promote action planning when using web-based computer-tailored advice. Clinicaltrials.gov NCT02672215 ; (Archived by WebCite at https://clinicaltrials.gov/ct2/show/NCT02672215 ).

  4. What's an Asthma Action Plan?

    Science.gov (United States)

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  5. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  6. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  7. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  8. What are the working mechanisms of a web-based workplace sitting intervention targeting psychosocial factors and action planning?

    Directory of Open Access Journals (Sweden)

    Katrien De Cocker

    2017-05-01

    Full Text Available Abstract Background Office workers demonstrate high levels of sitting on workdays. As sitting is positively associated with adverse health risks in adults, a theory-driven web-based computer-tailored intervention to influence workplace sitting, named ‘Start to Stand,’ was developed. The intervention was found to be effective in reducing self-reported workplace sitting among Flemish employees. The aim of this study was to investigate through which mechanisms the web-based computer-tailored intervention influenced self-reported workplace sitting. Methods Employees (n = 155 participated in a clustered randomised controlled trial and reported socio-demographics (age, gender, education, work-related (hours at work, employment duration, health-related (weight and height, workplace sitting and physical activity and psychosocial (knowledge, attitudes, self-efficacy, social support, intention regarding (changing sitting behaviours variables at baseline and 1-month follow-up. The product-of-coefficients test of MacKinnon based on multiple linear regression analyses was conducted to examine the mediating role of five psychosocial factors (knowledge, attitudes, self-efficacy, social support, intention. The influence of one self-regulation skill (action planning in the association between the intervention and self-reported workplace sitting time was investigated via moderation analyses. Results The intervention had a positive influence on knowledge (p = 0.040, but none of the psychosocial variables did mediate the intervention effect on self-reported workplace sitting. Action planning was found to be a significant moderator (p < 0.001 as the decrease in self-reported workplace sitting only occurred in the group completing an action plan. Conclusions Future interventions aimed at reducing employees’ workplace sitting are suggested to focus on self-regulatory skills and promote action planning when using web-based computer-tailored advice. Trial

  9. Mitigation Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  10. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  11. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  12. ECOWindS Joint Action Plan

    DEFF Research Database (Denmark)

    2014-01-01

    The Joint Action Plan (JAP) is a deliverable of the ECOWindS project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. The objective of the JAP is to be an international...

  13. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  14. Removal action work plan for Corehole 8 in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-11-01

    The objective of the Waste Area Grouping 1 Corehole 8 Removal Action is to collect strontium-90 contaminated groundwater that is currently being discharged from existing storm drains into First Creek. 90 Sr has been identified as a major contributor to potential risk offsite. First Creek contributes about 10% of the 90 Sr contamination detected at White Oak Dam. This Removal Action Work Plan (RAWP) addresses construction of new french drains, gravity piping, and a pressure sewer pipeline to collect and pump the contaminated water to Manhole 24. The contaminated water will then flow through existing pipes to the Process Waste Treatment Plant for treatment. The proposed scope of work for this project includes the installation of approximately 480 ft of high-density polyethylene gravity piping, with cleanouts, to transport the contaminated water to a proposed pumping station. The contaminated water will then be pumped from the new pump station approximately 1,140 ft through a new force main to Manhole 24. This project will reduce the quantity of 90 Sr contaminated groundwater entering First Creek

  15. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  16. Working on the Work: An Action Plan for Teachers, Principals, and Superintendents. The Jossey-Bass Education Series.

    Science.gov (United States)

    Schlechty, Phillip C.

    This book, which is a companion to the books, "Shaking up the Schoolhouse" and "Inventing Better Schools," presents the Working on the Work (WOW) framework for improving student performance by improving the quality of schoolwork. Field-tested in schools nationwide, the framework describes the 12 essential components of a WOW…

  17. Hungarian climate change action plan

    Energy Technology Data Exchange (ETDEWEB)

    Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  18. Climate Action Planning Tool | NREL

    Science.gov (United States)

    NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to Tool Calculation Formulas and Assumptions Climate Neutral Research Campuses Website Climate Neutral

  19. Safety margin evaluation concepts for plant Up rates and life extension. Results of the OECD/NEA/CSNI working group on Safety Margin Action Plan (SMAP)

    International Nuclear Information System (INIS)

    Belac, J

    2006-01-01

    This presentation summarizes results of the OECD/NEA/CSNI working group on Safety Margin Action Plan (SMAP) aimed to develop generalized safety margin concept and means of its quantification for the process of evaluating plant safety in the frame of plant life extension and power up rating activities to be used by OECD member countries. (author)

  20. St. Lawrence action plan meter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    The purpose of this bulletin is to report on the progress achieved under the St. Lawrence Action Plan. Under each of the Action Plan`s five objectives, it outlines environmental management indicators which identify actions taken and shows the results. This report presents the data collected in late August 1992 on the activities carried out by all partners of both governments involved in SLAP. The objectives examined in the bulletin are: to reduce by 90% the liquid toxic waste discharged by the 50 plants targeted for priority action; to prepare remediation plans for contaminated federal sites and restore wetlands; to conserve 5000 additional hectares of habitat and create a marine park; to develop and implement recovery plans for mammals, fish, birds, amphibians, reptiles, and plants; and to determine the state of the St. Lawrence River.

  1. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  2. American Samoa: Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conrad, Misty [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  3. Planning an action.

    Science.gov (United States)

    Gentilucci, M; Negrotti, A; Gangitano, M

    1997-06-01

    The motor control of a sequence of two motor acts forming an action was studied in the present experiment. The two analysed motor acts were reaching-grasping an object (first target) and placing it on a second target of the same shape and size (experiment 1). The aim was to determine whether extrinsic properties of the second target (i.e. target distance) could selectively influence the kinematics of reaching and grasping. Distance, position and size of both targets were randomly varied across the experimental session. The kinematics of the initial phase of the first motor act, that is, velocity of reaching and hand shaping of grasping, were influenced by distance of the second target. No kinematic difference was found between movements executed with and without visual control of both hand and targets. These results could be due to computation of the general program of an action that takes into account extrinsic properties of the final target. Conversely, they could depend on a visual interference effect produced by the near second target on the control of the first motor act. In order to dissociate the effects due to second target distance from those due to visual interference, two control experiments were carried out. In the first control experiment (experiment 2) subjects executed movements directed towards spatial locations at different distances from the first target, as in experiment 1. However, the near second target was not presented and subjects were required to place the object on an arbitrary near position. Distance of the second (either real or arbitrary) target affected the reaching component of the first motor act, as in experiment 1, but not the grasp component. In the second control experiment (experiment 3), the pure visual interference effect was tested. Subjects were required to reach and grasp the object and to lift it in either presence or absence of a second near stimulus. No effect on the initial phase of the first motor act was observed. The

  4. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  5. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  6. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  7. Interim remedial action work plan for the cesium plots at Waste Area Grouping 13 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-07-01

    This remedial action work plan (RAWP) is issued under the Federal Facility Agreement to provide a basic approach for implementing the interim remedial action (IRA) described in Interim Record of Decision for the Oak Ridge National Laboratory Waste Area Grouping 13 Cesium Plots, Oak Ridge, Tennessee. This RAWP summarizes the interim record of decision (IROD) requirements and establishes the strategy for the implementation of the field activities. As documented in the IROD document, the primary goal of this action is to reduce the risk to human health and the environment resulting from current elevated levels of gamma radiation on the site and at areas accessible to the public adjacent to the site. The major steps of this IRA are to: Excavate cesium-contaminated soil; place the excavated soils in containers and transport to Waste Area Grouping (WAG) 6; and backfill excavated plots with clean fill materials. The actual remedial action will be performed by Department of Energy prime contractor, MK-Ferguson of Oak Ridge Company. Remediation of the cesium plots will require approximately 60 days to complete. During this time, all activities will be performed according to this RAWP and the applicable specifications, plans, and procedures referred to in this document. The IRA on WAG 13 will prevent a known source of cesium-contaminated soil from producing elevated levels of gamma radiation in areas accessible to the public, eliminate sources of contamination to the environment, and reduce the risks associated with surveillance and maintenance of the WAG 13 site

  8. Action understanding as inverse planning.

    Science.gov (United States)

    Baker, Chris L; Saxe, Rebecca; Tenenbaum, Joshua B

    2009-12-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the principle of rationality: the expectation that agents will plan approximately rationally to achieve their goals, given their beliefs about the world. The mental states that caused an agent's behavior are inferred by inverting this model of rational planning using Bayesian inference, integrating the likelihood of the observed actions with the prior over mental states. This approach formalizes in precise probabilistic terms the essence of previous qualitative approaches to action understanding based on an "intentional stance" [Dennett, D. C. (1987). The intentional stance. Cambridge, MA: MIT Press] or a "teleological stance" [Gergely, G., Nádasdy, Z., Csibra, G., & Biró, S. (1995). Taking the intentional stance at 12 months of age. Cognition, 56, 165-193]. In three psychophysical experiments using animated stimuli of agents moving in simple mazes, we assess how well different inverse planning models based on different goal priors can predict human goal inferences. The results provide quantitative evidence for an approximately rational inference mechanism in human goal inference within our simplified stimulus paradigm, and for the flexible nature of goal representations that human observers can adopt. We discuss the implications of our experimental results for human action understanding in real-world contexts, and suggest how our framework might be extended to capture other kinds of mental state inferences, such as inferences about beliefs, or inferring whether an entity is an intentional agent.

  9. Action plan for photovoltaic standards

    Energy Technology Data Exchange (ETDEWEB)

    Oldach, R.

    1999-07-01

    This report examines the present situation regarding international standards governing photovoltaic (PV) systems and components, and seeks to identify barriers to the commercialisation of PV systems in the UK due to the absence of standards and codes of practice, and develop an action plan to overcome these barriers. An overview of standardisation bodies and standard generation mechanisms is presented, and the PV cells and modules, stand-alone PV systems, utility interconnection with PV systems, and building integration of PV are reviewed.

  10. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. Th...

  11. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  12. Yukon Government climate change action plan

    International Nuclear Information System (INIS)

    2009-02-01

    This Climate Change Action Plan described the measures that are being taken by the Yukon Government to adapt to, understand, and reduce contributions to climate change. The action plan is the result of input received from more than 100 individuals and organizations and provides clear direction for a strategy that will minimize the negative impacts of climate change and provide economic, social and other environmental benefits through climate change mitigation. The Yukon government has already taken many actions that respond to climate change, such as: developing the Yukon Cold Climate Innovation Centre; supporting the Northern Climate Exchange for public education and outreach; funding community recycling depots and other groups that reduce waste generation, promote public awareness and divert solid waste; and working with provincial and territorial counterparts to enhance national building standards. The main objectives of the climate change actions are to enhance knowledge and understanding of climate change; adapt to climate change; reduce greenhouse gas emissions; and lead Yukon action in response to climate change. tabs., figs.

  13. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  14. 29 CFR 1918.100 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans. (a) Scope and application. This section requires all employers to develop and implement an... departments that can be contacted for further information or explanation of duties under the plan. (c) Alarm... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work...

  15. An action plan for radioactive substances regulation

    International Nuclear Information System (INIS)

    1998-01-01

    This document sets out an action plan for the Agency's Radioactive Substances Regulation function. Our vision is to secure continuous improvement in the protection of the public and the environment from the harmful effects of radioactive substances. Radioactive Substances Regulation will work with others to realise this vision and contribute to the Agency's role in achieving sustainable development. We will also work to ensure that the Agency achieves its objectives in an efficient, consistent and integrated way. The main elements of our Action Plan are as follows: establishing indicators of sustainability and the means and methods of monitoring them; establishing performance indicators and a programme of targets and objectives to be achieved; establishing a database of all premises subject to RSA93 and to use it for work planning, resource targeting, and improvement to radioactive waste management; provision of systems of procedures and technical guidance to ensure nationally consistent and cost- effective regulation; establishing systems to audit the implementation of the procedures and guidance; ensuring quality of regulation by defining technical competencies of inspectors and the training programmes to secure them; an R and D programme targeted on improving radioactive waste management and radioactive substances regulation; and full and effective participation in development of national policy

  16. Plan Generation and Evaluation Using Action Networks

    National Research Council Canada - National Science Library

    Peot, Mark

    2003-01-01

    ... from potential actions of the plan. Methods used to accomplish these results included the use of Action Networks, and development of a suite of analysis tools in support of the AFRL Campaign Assessment Tool...

  17. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    Energy Technology Data Exchange (ETDEWEB)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors

  18. Information basis for developing comprehensive waste management system. US-Japan joint nuclear energy action plan waste management working group phase I report (Joint research)

    International Nuclear Information System (INIS)

    Yui, Mikazu; Ishikawa, Hirohisa; Umeki, Hiroyuki; Hioki, Kazumasa; Naito, Morimasa; Makino, Hitoshi; Oda, Chie; Tachi, Yukio; Mitsui, Seiichiro; Shibata, Masahiro; Watanabe, Atsuo; Yoshino, Kyoji; Seo, Toshihiro; Miyamoto, Yoichi; Nutt, Mark; Peters, Mark; Bresee, James; Lesica, Sue; Schwab, Patrick; Gomberg, Steve; Jones, Jay; Halsey, Bill; Marra, John; Vienna, John; Gombert, Drik; McMahon, Kevin; James, Scott; Caporuscio, Florie

    2010-05-01

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors

  19. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  20. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  1. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  2. The Effects of the Working on the Work Framework, an Action Plan for Teachers, on Student Engagement, Teacher Commitment, and Academics

    Science.gov (United States)

    Harless, Laurie Christenberry

    2010-01-01

    This study addressed the implementation of the Working on the Work (WOW) framework in an elementary school in Northwest Georgia. The researcher examined the effectiveness of the WOW framework on teacher commitment, teacher training, student engagement, and student achievement. The researcher used quantitative and qualitative research methods to…

  3. Solar heating action plan; Solvarme handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Jan Erik

    2011-10-15

    This solar action plan should be seen as a follow-up to the Danish Energy Agency's solar heating strategy from 2007, which showed great potential and opportunities for exploitation and use of solar heat in Denmark. In relation to the strategy from 2007, this action plan adjusted the distribution of solar heat from district heating plants and individual plants, but it is still the objective of this action plan to achieve the strategy's overall goal for 2030. With the implementation of the Action Plan in early 2012, it is estimated that in 2030 there will be about. 10 million m2 of solar collectors in operation, 8 million m2 for district heating and 2 million m2 for individual heating, equivalent to an installed capacity totaling 7 GW. The budget for actions in the Action Plan is about 80 million DKK annually over the next 5 years to initiate and ensure this development. (LN)

  4. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  5. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  6. Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Jeff Smith

    1998-08-01

    This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

  7. 'Action 2016': AREVA's strategic action plan to improve performance

    International Nuclear Information System (INIS)

    Marie, Patricia; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 12, 2011, Luc Oursel, Executive Officer of AREVA, and Pierre Aubouin, Chief Financial Executive Officer, presented the group's 'Action 2016' strategic action plan based on an in-depth analysis of the market's outlook. This document makes, first, a Detailed presentation of the 'Action 2016' plan and then presents the group's financial outlook: - Full-year 2011 immediate accounting consequences of the new market environment: operating losses expected in 2011; - 2012-2013 transition period Objective: self-finance capex in cumulative terms; - 2014-2016: safe growth and cash generation, free operating cash flow at break-even beginning in 2013, above euro 1 bn per year beginning in 2015

  8. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  9. 29 CFR 1917.30 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans—(1) Scope and application. This paragraph (a) requires all employers to develop and... departments that can be contacted for further information or explanation of duties under the plan. (3) Alarm... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work...

  10. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  11. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  12. Work hazard prevention plans

    International Nuclear Information System (INIS)

    Albertos Campos, F.

    2009-01-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  13. VTrans climate change action plan

    Science.gov (United States)

    2008-06-01

    VTrans is working closely with other state agencies, including the Agency of Natural Resources (ANR) to review and implement the transportation-related recommendations from the 2007 Governors Commission on Climate Change (GCCC) final report. The r...

  14. Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1

    International Nuclear Information System (INIS)

    1998-07-01

    This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout

  15. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  16. Quality Customer Service Action Plan

    International Nuclear Information System (INIS)

    2008-12-01

    Since its establishment in 1992 the RPII has been committed to the provision of high quality services to its customers. This report outlines how the RPII will work towards providing a high quality service to our customers and the standards we aim for in the provision of our services

  17. Putting Action Back into Action Planning: Experiences of Career Clients

    Science.gov (United States)

    Borgen, William A.; Maglio, Asa-Sophia T.

    2007-01-01

    This study used the critical incident technique to investigate what helped and hindered unemployed and career-changing people in implementing the action plans they developed while participating in career or employment counseling. Information from interviews with 23 women and 16 men generated 9 categories of helping incidents and 9 categories of…

  18. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  19. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  20. The Danish Organic Action Plan 2020

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Lassen, Anne Dahl; Løje, Hanne

    2015-01-01

    Objective With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food...... procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Design Comparison study measuring organic food procurement by applying two different methods, one based on the use...... organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Subjects Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). Results A high significant correlation coefficient was found between the two...

  1. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  2. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  3. Heart Truth for Women: An Action Plan

    Science.gov (United States)

    ... only treatment that some people need. Kick the Smoking Habit There is nothing easy about giving up cigarettes, but with a plan of action, you can do it. Become aware of your personal smoking “triggers”—the situations that typically bring on the ...

  4. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  5. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  6. 24 CFR 91.220 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development..., evaluate and reduce lead-based paint hazards, reduce the number of poverty-level families, develop...

  7. 24 CFR 91.320 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development...), evaluate and reduce lead-based paint hazards, reduce the number of poverty level families, develop...

  8. 36 CFR 72.13 - Action plan.

    Science.gov (United States)

    2010-07-01

    ... objectives, priorities and implementation strategies in relation to the intent of the Urban Park and... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK...

  9. Structural priming, action planning, and grammar.

    Science.gov (United States)

    MacDonald, Maryellen C; Weiss, Daniel J

    2017-01-01

    Structural priming is poorly understood and cannot inform accounts of grammar for two reasons. First, those who view performance as grammar + processing will always be able to attribute psycholinguistic data to processing rather than grammar. Second, structural priming may be simply an example of hysteresis effects in general action planning. If so, then priming offers no special insight into grammar.

  10. 7 CFR 275.16 - Corrective action planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...

  11. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  12. Strategic Action Plan for ERNWACA - 2007-2011 | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strategic Action Plan for ERNWACA - 2007-2011. IDRC institutional support over the period 2003-2006 (project 102095) enabled the Educational Research Network for West and Central Africa (ERNWACA) to carry out research that made an important contribution to policy dialogue in the region. The work also allowed the ...

  13. Does the knowledge-to-action (KTA) framework facilitate physical demands analysis development for firefighter injury management and return-to-work planning?

    Science.gov (United States)

    Sinden, Kathryn; MacDermid, Joy C

    2014-03-01

    Employers are tasked with developing injury management and return-to-work (RTW) programs in response to occupational health and safety policies. Physical demands analyses (PDAs) are the cornerstone of injury management and RTW development. Synthesizing and contextualizing policy knowledge for use in occupational program development, including PDAs, is challenging due to multiple stakeholder involvement. Few studies have used a knowledge translation theoretical framework to facilitate policy-based interventions in occupational contexts. The primary aim of this case study was to identify how constructs of the knowledge-to-action (KTA) framework were reflected in employer stakeholder-researcher collaborations during development of a firefighter PDA. Four stakeholder meetings were conducted with employee participants who had experience using PDAs in their occupational role. Directed content analysis informed analyses of meeting minutes, stakeholder views and personal reflections recorded throughout the case. Existing knowledge sources including local data, stakeholder experiences, policies and priorities were synthesized and tailored to develop a PDA in response to the barriers and facilitators identified by the firefighters. The flexibility of the KTA framework and synthesis of multiple knowledge sources were identified strengths. The KTA Action cycle was useful in directing the overall process but insufficient for directing the specific aspects of PDA development. Integration of specific PDA guidelines into the process provided explicit direction on best practices in tailoring the PDA and knowledge synthesis. Although the themes of the KTA framework were confirmed in our analysis, order modification of the KTA components was required. Despite a complex context with divergent perspectives successful implementation of a draft PDA was achieved. The KTA framework facilitated knowledge synthesis and PDA development but specific standards and modifications to the KTA

  14. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  15. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  16. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  17. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  18. National Biofuels Action Plan, October 2008

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  19. Action plans can interact to hinder or facilitate reach performance.

    Science.gov (United States)

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  20. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  1. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  2. BEPS Action Plan: Global Tax Cooperation

    Directory of Open Access Journals (Sweden)

    Andrei Shelepov

    2016-12-01

    Full Text Available Given the dynamics of economic and financial globalization, national tax authorities often do not have adequate tools to effectively combat tax avoidance practices that exploit gaps in the existing tax rules. To address the global problem of tax base erosion and profit shifting (BEPS, the Organisation for Economic Co-operation and Development (OECD and the Group of 20 (G20 have consolidated their efforts on an equal footing. Their joint BEPS Action Plan allowed to involve more than 100 countries, both developing and advanced, in designing and implementing rules aimed at aligning the generation of profits and their taxation and increasing the predictability, transparency and flexibility of the international tax environment for business. This article examines the history of the BEPS project, emphasizing the mode of OECD-G20 engagement in global tax governance, describes the key recommendations made by international institutions to tackle BEPS and forecasts further developments in the area. The author pays special attention to the mechanisms designed to stimulate participation by non-OECD and non-G20 members in the BEPS project and the stance of business on the proposed reforms. He concludes that the work on BEPS is far from finished. Different interpretations of standards, risks of strengthening tax competition between countries and potentially excessive tax burdens on businesses should be addressed. In this regard, OECD and G20 should strengthen their efforts to ensure the participation of developing countries and the private sector, which would stimulate other reforms in international taxation to support global growth and development.

  3. Predicting Plan Failure by Monitoring Action Sequences and Duration

    Directory of Open Access Journals (Sweden)

    Giovani Parente FARIAS

    2017-07-01

    Full Text Available An agent can attempt to achieve multiple goals and each goal can be achieved by applying various different plans. Anticipating failures in agent plan execution is important to enable an agent to develop strategies to avoid or circumvent such failures, allowing the agent to achieve its goal. Plan recognition can be used to infer which plans are being executed from observations of sequences of activities being performed by an agent. Symbolic Plan Recognition is an algorithm that represents knowledge about the agents under observation in the form of a plan library. In this work, we use this symbolic algorithm to find out which plan the agent is performing and we develop a failure prediction system, based on information available in the plan library and in a simplified calendar which manages the goals the agent has to achieve. This failure predictor is able to monitor the sequence of agent actions and detects if an action is taking too long or does not match the plan that the agent was expected to be performing. We have successfully employed this approach in a health-care prototype system.

  4. Maintenance Action Work Plan for Waste Area Grouping 1 inactive tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-07-01

    This Maintenance Action Work Plan has been prepared to document the activities and procedures for the remediation of four inactive, low-level radioactive tanks at Waste Area Grouping 1, from the Category D list of tanks in the Federal Facility Agreement for the Oak Ridge Reservation (EPA et al. 1994). The four tanks to remediated are tanks 3001-B, 3004-B, T-30, and 3013. Three of the tanks (3001-B, 3004-B, and T-30) will be physically removed from the ground. Because of logistical issues associted with excavation and site access, the fourth tank (3013) will be grouted in place and permanently closed

  5. 29 CFR 1910.38 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An... plans. An emergency action plan must be in writing, kept in the workplace, and available to employees... information about the plan or an explanation of their duties under the plan. (d) Employee alarm system. An...

  6. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  7. Action plan for renewable energy sources

    International Nuclear Information System (INIS)

    2000-03-01

    In the Finnish Energy Strategy, approved by the Finnish Government in 1997, the emphasis is laid on the importance of bioenergy and other renewable energy sources for the creation of such prerequisites for the Finnish energy economy that the supply of energy can be secured, the price on energy is competitive and the emissions from energy generation are within the limits set by the international commitments made by Finland. In 1998, the European Union Meeting of the Ministers of Energy adopted a resolution taking a positive attitude to the Communication from the Commission 'Energy for the future: Renewable sources of energy' - White Paper for a Community Strategy and Action Plan. National measures play a key role in the achievement of the objectives set in the White Paper. This Action Plan for Renewable Energy Sources is a national programme in line with the EU's White Paper. It comprises all renewable sources of energy available in Finland. It encompasses even peat, which in Finland has traditionally been considered to be a solid biofuel but is internationally classified as one of the non-renewable sources of energy. In the Action Plan, objectives are set for the volume of renewable energy sources used in the year 2010 including a prognosis on the development by the year 2025. The goal is that by the year 2010 the volume of energy generated using renewable energy sources has increased by 50% compared with the year 1995. This would mean an increase by 3 Mtoe, which is about 1 Mtoe more than anticipated in the outlook based on the Finnish Energy Strategy. A further goal is to double the use of renewable energy sources by the year 2025. The aggregate use of renewable energy sources depends to a large extent both on the development of the price on energy produced using other energy sources and on possible changes in the production volume of the Finnish forest industry. The most important objective stated in the Action Plan is to improve the competitiveness of renewable

  8. Fukushima action plan 2014; Aktionsplan Fukushima 2014

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-02-15

    analyses of the EU stress tests new points were added. The list of the identified points is continually verified on the basis of newest findings and updated if necessary. In 2014 it was decided to definitively shut down the KKM reactor in 2019. The decision to withdraw the long term operation of KKM influences the application of the improvements planned and imposed as a consequence of Fukushima.The Fukushima action plans are an instrument for the evaluation of new findings from the Fukushima accident and for planning improvements. The advancement of the treatment of the identified points is documented and published.

  9. Joint action without and beyond planning

    DEFF Research Database (Denmark)

    Blomberg, Olle

    2013-01-01

    ” that one must have in order to be a party to a shared intention (consider, for example, the social play of young children or the cooperative hunting of non-human primates or social carnivores). The second lacuna concerns how participants (including adult human agents) are able to coordinate their actions......, to make sense of the idea that joint activities are non-accidentally coordinated. In chapter 3, I offer an account of a kind of joint activity in which agents such as young children and some non-human primates could participate, given what we know about their socio-cognitive capacities. In chapter 4, I...... to perform “our” joint action. I reject this constraint and argue that some joint actions (such as a joint manoeuvre performed by two figure skaters) are joint in virtue of each participant having what I call ‘socially extended intention-in-action’ that overlap. In chapter 5, I review empirical work...

  10. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  11. Affirmative Action Plan, October 1991--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  12. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  13. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  14. Fukushima action plan 2015; Aktionsplan Fukushima 2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-02-15

    stress tests new points were added. The list of the identified points is continually verified on the basis of newest findings and updated if necessary. The Fukushima action plans are an instrument for the evaluation of new findings from the Fukushima accident and for planning improvements. The advancement of the treatment of the identified points is documented and published.

  15. Clean slate corrective action investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  16. Clean slate corrective action investigation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT)

  17. SADC establishes a regional action plan.

    Science.gov (United States)

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  18. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  19. Westcoast Energy Inc. VCR action plan

    International Nuclear Information System (INIS)

    1998-01-01

    Westcoast Energy Inc. comprises a group of 14 major natural gas and petroleum companies from Canada and the United States. Climate change is a key strategic issue for the group. This paper represents their first consolidated Voluntary Challenge and Registry (VCR) action plan and includes updated information for the seven Westcoast companies which have previously filed individual action plans with the VCR office. Westcoast is involved in gathering and distribution of natural gas to more than one million consumers in Canada, and strongly supports a voluntary approach to meet Canada's commitment to reduce greenhouse gas emissions. Westcoast believes that market-based measures are the most effective and least-expensive way of addressing climate change issues. Key actions undertaken by Westcoast in 1996 were: (1) the creation of a climate change employee awareness program, (2) the development of greenhouse gas emissions inventories, (3) the use of new technologies and methods to reduce greenhouse gas emissions, (4) the development and use of end-user energy efficiency programs, and (5) support for research and pilot scale projects aimed at market-based approaches. In 1996, Westcoast emission from operational sources were 8,201 kt CO 2 equivalent. Emissions from operational sources represent an increase of 42 per cent over 1990 emissions. The main reason for these higher emissions is the increased market demand for natural gas which has resulted in the expansion of Westcoast operations. The demand for natural gas is expected to remain high because natural gas offers low carbon intensity compared to other fossil fuels. Future actions to reduce greenhouse gas emissions include gas storage in abandoned pipelines, a corporation-wide greenhouse gas emission reduction workshop, use of dry low NO x turbine combustion technology, advanced pipeline technology, acid gas reinjection, improvements in data tracking and capture, co-generation, recovery of landfill methane, and support

  20. Radiation protection challenges into the 21st century. Action planning

    International Nuclear Information System (INIS)

    Bandle, A.M.

    2000-01-01

    Building on the work undertaken by the UK Health and Safety Executive in liaison with the wider health and safety community to examine emerging technological trends and their implications for occupational health and safety, a paper was produced for the Southport '99 International Symposium which looked at the likely impact on radiation protection. This paper reports on the next phase of the work which is designed to set the agenda for regulators, duty holders, qualified experts and other key stakeholders and intermediaries. Broad trends and themes determined by phase 1 of the work are translated into action plans aimed at anticipating the key challenges and exploiting the opportunities offered by technological developments for radiation protection purposes. These might equally be to achieve improved risk assessment and exposure characterisations of uncertain or novel practices (or interventions), to promote improved design of equipment and systems of work and adoption of inherently safer processes or procedures, to raise standards of competence in key workers and managers, or to encourage greater collaboration and joined up working between different groups of stakeholders and across national boundaries. The principle purpose of sharing this vision of the future is to encourage radiation protection professionals and others with an interest in radiation and nuclear technologies, to register an interest. It will only be by engagement that the priorities and activities proposed in the action plan can be refined and only by a team effort that the implementation plan can be fully realised. And then there is the next action plan to build and tackle....(author)

  1. Action plan against declining vineyards: An innovative approach

    Directory of Open Access Journals (Sweden)

    Riou Christophe

    2016-01-01

    Full Text Available Declining vineyards are assessed by a multi-year decrease in vine productivity and/or its sudden premature or gradual death, based on multiple factors. Since 2015, the French wine sector has been working on an original study to identify new research avenues while launching an innovative action plan to combat vineyard decline. First, a statistical analysis enabled to estimate research efforts in the different countries. 70 factors susceptible to contribute to vineyard decline were then identified by analyzing more than 500 publications. These factors are biological, physical or linked to growing practices. While the role of pathogens is fairly well-known, the impact of the land plot or the soil on decline is less understood. Secondly, a prospective methodology was used to better identify viticulture system factors and levers affecting vines. It was thus demonstrated that yield and longevity are strongly linked to agronomy, economic variables and plant matter, plant physiology, disease, etc... These are the key issues and leverage actions to combat more strongly vineyard decline. The matrix analysis was then complemented by interviews and statistical data to imagine leverage actions. The strategic action plan is focused on four objectives: promoting training of good practices, improving plant production organization, developing vineyard observation networks, implementing an innovative research plan.

  2. Texas strategic action plan for motorcycles : 2013-2018.

    Science.gov (United States)

    2013-06-01

    The Texas Strategic Action Plan for Motorcycles: 2013-2018 provides an integrated : approach to identify implementable strategies and action steps to make the : road environment and infrastructure safer for motorcyclists and other powered : two- and ...

  3. ORD Strategic Action Plan for Information Management / Information Technology 2011

    Science.gov (United States)

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  4. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-06-27

    ... Prevention and Health Promotion, Division of Reproductive Health, Attn: National Public Health Action Plan... Disease Prevention and Health Promotion, Division of Reproductive Health, 4770 Buford Highway NE... topic's public health importance, existing challenges, and opportunities for action to decrease the...

  5. Working plan BDG 91/92

    International Nuclear Information System (INIS)

    1991-09-01

    This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs

  6. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    of the methodology is included in Chapter 6. As recognized from the beginning, the proposed action plan has been highly multidisciplinary and a wide variety of expertise has been needed for its development. The exchange of information and experience among participating organizations, which was defined as the third objective in the safety margins action plan, has not been only an essential working method, but also a net benefit of the work

  7. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  8. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  9. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  10. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2011-01-01

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  11. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  12. [Strategic planning: an important economic action for German hospitals].

    Science.gov (United States)

    Wiese, Christoph H R; Zink, Wolfgang; Russo, Sebastian G

    2011-11-01

    In medical systems, economic issues and means of action are in the course of dwindling human (physicians and nurses) and financial resources are more important. For this reason, physicians must understand basic economic principles. Only in this way, there may be medical autonomy from social systems and hospital administrators. The current work is an approach to present a model for strategic planning of an anesthesia department. For this, a "strengths", "weaknesses", "opportunities", and "threats" (SWOT) analysis is used. This display is an example of an exemplary anaesthetic department. © Georg Thieme Verlag Stuttgart · New York.

  13. Smart Buildings: Business Case and Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  14. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  15. Behavior Plan, Does It Work?

    Science.gov (United States)

    Gonzalez, Blanca M.; Brown, D.

    2015-01-01

    As educators, we are responsible for teaching academic skills. However, some students not only need to learn academic skills but they need behavior support, due to problematic behaviors that are happening in the school setting. In this article, we will learn more of what are the implications, requirements and best strategies for a behavior plan.…

  16. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  17. Prairie Conservation in Canada: The Prairie Conservation Action Plan Experience

    Science.gov (United States)

    Dean Nernberg; David Ingstrup

    2005-01-01

    In Canada, grassland conservation has been mobilized and directed through the development of Prairie Conservation Action Plans and Action Plan Committees in the three prairie provinces of Alberta (45 partner agencies and organizations), Saskatchewan (26 partners), and Manitoba (26 partners). In Alberta, 43 percent of the native prairie remains; in Saskatchewan and...

  18. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document

  19. Drawing plan for solid works

    International Nuclear Information System (INIS)

    Lee, Kuk Hwan; Kim, Hyung Seop; Yu, Dae Won

    2004-02-01

    This book deals with beginning solid works 2003, setting system option, setting tool group, setting document and storing part template file. It also introduces works of basic solid works modeling such as making of square, circuit, plate washer, square column, block I, block II, link, cover plate, position block and housing. The last part explains drawing of fix block, stopper plate III, bracket, cover, belt pulley, circle plate, square, block, stopper block, angle block, washer, circle block and link.878

  20. Applying Planning Algorithms to Argue in Cooperative Work

    Science.gov (United States)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  1. National Action Plan for Energy Efficiency Report

    Energy Technology Data Exchange (ETDEWEB)

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  2. Electric driving accelerated. Action Plan 2011-2015. Annex 2

    International Nuclear Information System (INIS)

    2011-10-01

    The Dutch Action Plan for Electric Driving gives form and substance to the ambition of the Dutch government to accelerate the market introduction of electric cars in the Netherlands. This plan is not only focused on the electric passenger car. To promote the electrification of transport, also electric garbage trucks, buses, scooters and possibly pleasure boats are included in the plan. [nl

  3. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  4. Turning strategy into action: implementing a conservation action plan in the Cape Floristic Region

    CSIR Research Space (South Africa)

    Gelderblom, CM

    2003-07-01

    Full Text Available for conservation. These pressures are predicted to intensify, as the region acts as a magnet for settlement and development. This paper thus describes the development of a conservation action plan for the region, arising from the Cape Action Plan...

  5. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-07-15

    ... Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY... guidance ``PAG Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents... ``anonymous access'' system, which means the EPA will not know your identity or contact information unless you...

  6. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  7. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  8. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    Directory of Open Access Journals (Sweden)

    Sanjeev Sridharan

    2016-09-01

    Full Text Available Background: Mainstreaming of gender, equity, and human rights (GER is an important focus of the World Health Organization (WHO and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design: A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results: GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions: Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  9. Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Laura Pastor

    2006-01-01

    locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan

  10. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  11. Government of Canada Action Plan 2000 on Climate Change

    International Nuclear Information System (INIS)

    2000-01-01

    In this first National Climate Change Business Plan the Government of Canada affirms its intention to invest up to $500 million over five years on specific actions to reduce greenhouse gas emissions. This sum is in addition to the action plans being put forward by the provincial and territorial governments and in addition to the $625 million investment over five years announced in Budget 2000. Action Plan 2000 targets key sectors, and the measures announced are expected to take Canada one third of the way to achieving the target established in the Kyoto Protocol by reducing Canada's GHG emissions by 65 megatonnes per year during the 2008-2012 commitment period. The key sectors targeted include the areas of transportation, oil, gas and electricity production, industry, buildings, forestry and agriculture, i. e. sectors that together account for over 90 per cent of Canada's GHG emissions.The Action Plan focuses on reducing GHG emissions in a cost effective way; draws extensively on the best ideas put forward by the provinces, territories and other stakeholders; encourages action by industry and consumers; complements measures and actions by the provinces and territories to address regional issues; and sets the stage for long-term behavioural, technological and economic changes. The remainder of Canada's Kyoto commitments will be addressed by actions in future plans which are currently in the process of being developed, together with the development of further details of this first National Climate Change Business Plan

  12. Developing Action Plans Based on Strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter H.; Vinter, Otto

    2018-01-01

    The authors have performed a thorough study of the change strategy literature that is the foundation for the 10 overall change strategies defined in ISO/IEC 33014. Then the authors identified eight aspects that should be considered when developing the concrete actions for executing the strategy....

  13. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  14. 29 CFR 1608.4 - Establishing affirmative action plans.

    Science.gov (United States)

    2010-07-01

    ... taken pursuant to an affirmative action plan or program must be reasonable in relation to the problems... remedy the situation. Such steps, which in design and execution may be race, color, sex or ethnic...

  15. Transit green building action plan : report to congress

    Science.gov (United States)

    2009-06-04

    The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...

  16. Learning through Participatory Action Research for Community Ecotourism Planning.

    Science.gov (United States)

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  17. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  18. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  19. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  20. to the National Mental Health Action Plan

    African Journals Online (AJOL)

    strategic planning meeting, held from 30 March to 1 April 2012 in. Windhoek .... psychiatrists to be incorporated at all the levels of decision-making: facility .... of a recovery-focused model. .... Suicide risk assessment must be made a core competency of all .... and auditing of mental healthcare programmes to be established in.

  1. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  2. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  3. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  4. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  5. Planning for Action: Campaign Concepts and Tools

    Science.gov (United States)

    2012-08-01

    painting that gets the creative juices flowing. Campaign planning is an art, but some of the science of tactics, techniques, and practices (TTP) can help...Designation of the reserve, including its location and composition .  Reconnaissance and security operations.  Essential stability tasks...measurable, collectable, and relevant to a specific time. Examples of indicators include bushels of apples sold in a specific market in the past

  6. [Some psychological problems in family planning work].

    Science.gov (United States)

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  7. 29 CFR 1926.35 - Employee emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all...) Names or regular job titles of persons or departments who can be contacted for further information or... the employee in the event of an emergency. The written plan shall be kept at the workplace and made...

  8. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  9. Application of action planning to PES systems

    OpenAIRE

    Paredes Cuervo, Diego; Arango Ramírez, Alejandro

    2008-01-01

    Buscando aportar una de las primeras aproximaciones metodológicas al tema del pago por servicios ambientales (PSA) en la cuenca del río Otún (Risaralda, Colombia) se propuso un plan de acción para la instalación de un sistema de PSA en la zona. El resultado principal de este proceso fue la definición de las actividades, responsabilidades y recursos para la implementación de un proyecto piloto de PSA enfocado en la calidad hídrica y la conservación de la biodiversidad y que incluirá como p...

  10. NIH Launches National COPD Action Plan | NIH MedlinePlus the Magazine

    Science.gov (United States)

    ... COPD Action Plan Follow us NIH Launches National COPD Action Plan Photo: National Heart, Lung, and Blood ... questions for NIH MedlinePlus magazine. Why was the COPD National Action Plan created? The staggering numbers associated ...

  11. NEAP - National Environmental Action Plan (Republic of Macedonia)

    International Nuclear Information System (INIS)

    Shnajder-Jakobi, Martin; Anastasovski, Vasil; Gorgievski, Kire.

    1997-01-01

    The Republic of Macedonia, like other Central and East European countries in transition, has started the process of reform towards a market economy. As a part of the economic development program, the Republic of Macedonia is shaping its environmental polices and identifying priority actions to protect human health and the environment and to utilize its natural resources in a sustainable manner. These polices and actions are consistent with the 'Environmental Action Programme for Central and Eastern Europe' (EAP), the document adopted at the Ministerial Conference in Lucerne in 1993. In meeting the goals towards protecting the environment, The Government of the Republic of Macedonia has prepared the National Environmental Action Plan (NEAP) with the support of the World Bank group. The Ministry of Urban Planning, Construction and Environment was the key agency involved in the preparation of the NEAP. The NEAP highlights the environmental problems and recommends actions related to policy, institutions and priority investments. (author)

  12. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  13. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  14. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    Science.gov (United States)

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-11-01

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  15. Spatial Working Memory Is Necessary for Actions to Guide Thought

    Science.gov (United States)

    Thomas, Laura E.

    2013-01-01

    Directed actions can play a causal role in cognition, shaping thought processes. What drives this cross-talk between action and thought? I investigated the hypothesis that representations in spatial working memory mediate interactions between directed actions and problem solving. Participants attempted to solve an insight problem while…

  16. The neural basis of predicting the outcomes of planned actions

    Directory of Open Access Journals (Sweden)

    Andrew eJahn

    2011-11-01

    Full Text Available A key feature of human intelligence is the ability to predict the outcomes of one’s own actions prior to executing them. Action values are thought to be represented in part in the dorsal and ventral medial prefrontal cortex, yet current studies have focused on the value of executed actions rather than the anticipated value of a planned action. Thus, little is known about the neural basis of how individuals think (or fail to think about their actions and the potential consequences before they act. We scanned individuals with fMRI while they thought about performing actions that they knew would likely be correct or incorrect. Here we show that merely imagining an error, as opposed to imagining a correct outcome, increases activity in the dorsal anterior cingulate cortex, independently of subsequent actions. This activity overlaps with regions that respond to actual error commission. The findings show a distinct network that signals the prospective outcomes of one’s planned actions. A number of clinical disorders such as schizophrenia and drug abuse involve a failure to take the potential consequences of an action into account prior to acting. Our results thus suggest how dysfunctions of the medial prefrontal cortex may contribute to such failures.

  17. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  18. Participatory action research as work stress intervention

    NARCIS (Netherlands)

    Dollard, M.F.; Blanc, Le P.M.; Cotton, S.J.; Naswal, K.; Hellgren, J.; Sverke, M.

    2008-01-01

    Working life has been the subject of great change in recent years with contemporary conditions generally providing increased opportunities and autonomy for individuals. But these benefits can coincide with greater demands and responsibilities, increasing the pressure to work outside of traditional

  19. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Joomyung; Jae, Moosung [Hanyang Univ., Seoul (Korea, Republic of); Ahn, Kwangil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy.

  20. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    International Nuclear Information System (INIS)

    Lee, Joomyung; Jae, Moosung; Ahn, Kwangil

    2013-01-01

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy

  1. Action plan for electric mobility in Canada

    International Nuclear Information System (INIS)

    Gilbert, R.; Cormier, A.; Lavallee, P.

    2005-01-01

    Electric mobility is an important emerging industry in Canada, where there is significant expertise in electric and hybrid vehicles, batteries, hybrid technologies, grid-connected technologies and fuel cell vehicles. This paper presented a case for the formation of Electric Mobility Canada, a proposed network of private companies and public sector agencies that aims to stimulate industry and provide support to government agencies involved with meeting Canada's obligations under the Kyoto Protocol, as well as in new industry sectors. The environmental, health, economic and industrial benefits of electric mobility were outlined. Current programs for electric mobility were reviewed, and details of financial incentives and initiatives were presented. An overview of electric mobility programs in the United States and Europe was provided. Research and development needs were evaluated. The former Electric Vehicle Association of Canada was discussed. An organizational structure for the proposed network was presented, along with a mission statement and outline of future goals. Recommendations for the future of the network included identifying short and long-term market opportunities for electric mobility technologies for all surface transport modes in Canada; determining research and development needs and appropriate funding and investment opportunities; determining other actions necessary to allow the electric mobility industry to play a growing role in meeting Canada's transport needs; and raising public awareness of the importance of electric mobility trends. It was concluded that the federal government should be approached for start-up funds for the network, which will be followed by further investment from provincial and business interests once the network is in place and functioning. 84 refs

  2. Planned Parenthood works with Korean government.

    Science.gov (United States)

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  3. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  4. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  5. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  6. Action plan to reduce perinatal mortality.

    Science.gov (United States)

    Bhakoo, O N; Kumar, R

    1990-01-01

    The government of India has set a goal of reducing perinatal mortality from its current rate of 48/1000 to 30-35/1000 by the year 2000. Perinatal deaths result from maternal malnutrition, inadequate prenatal care, complications of delivery, and infections in the postpartum period. Since reductions in perinatal mortality require attention to social, economic, and behavioral factors, as well as improvements in the health care delivery system, a comprehensive strategy is required. Social measures, such as raising the age at marriage to 18 years for females, improving the nutritional status of adolescent girls, reducing the strenuousness of work during pregnancy, improving female literacy, raising women's status in the society and thus in the family, and poverty alleviation programs, would all help eliminate the extent of complications of pregnancy. Measures required to enhance infant survival include improved prenatal care, prenatal tetanus toxoid immunization, use of sterile disposable cord care kits, the provision of mucus extractors and resuscitation materials to birth attendants, the creation of neonatal care units in health facilities, and more efficient referral of high-risk newborns and mothers. Since 90% of births in rural India take place at home priority must be given to training traditional birth attendants in the identification of high risk factors during pregnancy, delivery, and the newborn period.

  7. Preparing US community greenhouse gas inventories for climate action plans

    International Nuclear Information System (INIS)

    Blackhurst, Michael; Scott Matthews, H; Hendrickson, Chris T; Sharrard, Aurora L; Azevedo, Ines Lima

    2011-01-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  8. Preparing US community greenhouse gas inventories for climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael [Department of Civil, Architectural and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0276 (United States); Scott Matthews, H; Hendrickson, Chris T [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Sharrard, Aurora L [Green Building Alliance, 333 East Carson Street, Suite 331, Pittsburgh, PA 15219 (United States); Azevedo, Ines Lima, E-mail: mblackhurst@gmail.com, E-mail: hsm@cmu.edu, E-mail: auroras@gbapgh.org, E-mail: cth@andrew.cmu.edu, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-07-15

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  9. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...

  10. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  11. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  12. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  13. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  14. IAEA supports regional seas conventions and action plans

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs about the 3rd Global Meeting of Regional Seas Conventions and Action Plans held in Monaco in November 2000 at the IAEA's Marine Environmental Laboratory (IAEA-MEL). The meeting assembled a number of marine environmental experts from several UN bodies to reinforce activities to protect the marine environment

  15. 12 CFR 704.10 - Investment action plan.

    Science.gov (United States)

    2010-01-01

    ... market pricing, cash flows, and risk; (3) How the investment fits into the credit union's asset and... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an...

  16. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  17. Town of Canmore Energy Management Action Plan (EMAP)

    International Nuclear Information System (INIS)

    2005-03-01

    In 1999, the Town of Canmore, Alberta joined the Federation of Canadian Municipalities' Partners for Climate Protection (PCP) Program and committed to reducing greenhouse gas (GHG) emissions from municipal operations by 20 per cent and community-wide emissions by 6 per cent of 2000 levels by 2012. To date, the City has completed a baseline analysis for municipal operations and the community. It has also initiated an Energy Management Action Plan (EMAP) to identify opportunities in sustainable development through energy, GHG and air quality management. The broad community objectives include housing and transportation management, job creation and local economic development. The city has adopted The Natural Step (TNS) framework which defines sustainability and the guiding principles for decision-making. The objectives of EMAP are to define and evaluate options for a practical strategy and action plan to meet the city's GHG reduction targets; raise local awareness of the issues and opportunities of energy planning and GHG reductions and develop a local action plan outlining action items to reduce energy use and GHG emissions from municipal operations throughout the community. This report explained the methodology and framework for EMAP management and presented a community profile for the Town of Canmore. It also included an energy and emissions inventory and forecast with reference to corporate energy and emissions baseline; community energy and emissions baseline; corporate energy and emissions forecast; community energy and emissions forecast and corporate and community GHG targets. refs., tabs., figs

  18. Action Plan for the Development of Civic Morality

    Science.gov (United States)

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  19. Quantity and quality of written feedback, action plans, and student ...

    African Journals Online (AJOL)

    Background. Mini-clinical-evaluation exercise (mini-CEX) assessment forms that have been modified with the addition of specific spaces on separate sheets are expected to improve the quantity and quality of written feedback and the action plan for further learning which is agreed upon, and to encourage written reflection.

  20. A national action plan for workforce development in behavioral health.

    Science.gov (United States)

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  1. From Readiness to Action: How Motivation Works

    Directory of Open Access Journals (Sweden)

    Kruglanski Arie W.

    2014-09-01

    Full Text Available We present a new theoretical construct labeled motivational readiness. It is defined as the inclination, whether or not ultimately implemented, to satisfy a desire. A general model of readiness is described which builds on the work of prior theories, including animal learning models and personality approaches, and which aims to integrate a variety of research findings across different domains of motivational research. Components of this model include the Want state (that is, an individual’s currently active desire, and the Expectancy of being able to satisfy that Want. We maintain that the Want concept is the critical ingredient in motivational readiness: without it, readiness cannot exist. In contrast, some motivational readiness can exist without Expectancy. We also discuss the role of incentive in motivational readiness. Incentive is presently conceived of in terms of a Match between a Want and a Perceived Situational Affordance. Whereas in classic models incentive was portrayed as a first order determinant of motivational readiness, here we describe it as a second order factor which affects readiness by influencing Want, Expectancy, or both. The new model’s relation to its theoretical predecessors, and its implications for future research, also are discussed.

  2. Evaluation criteria for communications-related corrective action plans

    International Nuclear Information System (INIS)

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations

  3. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  4. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    Science.gov (United States)

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous

  5. Energy efficiency action plan. Policy action plan for promotion of energy efficiency in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply and environmental protection. Therefore, the Czech government aims to promote these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. In addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formulation of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Energy Efficiency Action Plan focuses on promotion of energy efficiency in end-use (this report); The Renewable Energy Action Plan (separate report; ECN-C--99-064) deals with policy on promotion of renewable energy production. These two Action Plans provide policy makers in the Czech government with essential information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; and (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the investment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  6. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  7. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  8. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  9. Transport Canada's sustainable development action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-30

    Transport Canada's sustainable development strategy, tabled in the House of Commons in December 1997, sets out the direction for the Department to integrate environmental concerns with safety and efficiency in developing policies and programs and in carrying out its day-to-day activities. While recognizing that moving towards sustainable development is a long-term undertaking, the department is determined to turn 'words' into 'work'. The action plan outlined in this document is organized according to the challenges laid out in the original Sustainable Development Strategy document. Accordingly, the department shall endeavour to minimize risk of environmental damage from transportation accidents; promote greening of operations in the transportation sector; reduce emissions of hazardous substances from transportation sources; promote education and awareness on sustainable transportation; refine sustainable performance indicators; and develop and promote the application of cleaner transportation systems and transportation technologies. The bulk of the report is devoted to brief summaries of progress achieved in each of these areas to date.

  10. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    Croft, J.R.; Robb, J.D.

    1993-01-01

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  11. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action

  12. Action of personal planning in the mining firm

    Directory of Open Access Journals (Sweden)

    Antošová Mária

    2004-06-01

    Full Text Available Planning in the personal area is systematically performed by the way of forcasting of future needs and reserves in human resources in every organization. By evaluating the number and the kind of employees, the organization will need, the department of human resources management can plan their obtaining, education and development, or the working process.The paper is dealing with the neccessity for the personal planning in every organization, irrespective of to its volume or tasks and area of planning. Planning of human resources demand a valuable, detailed and actural information, without that it cannot formulate real goals and predict the development of indexes influencing for achievement of such goals. To such information belong external factors (the prognosis of state economy development, competition, work market, etc., as well as the internal information that have an influence on the obtaining and forming of working power. In the next part I deal with the process of personal planning and methods of evaluation for workers needs. The process of one method - based on the analysis of development trends is used as an example of the calculation of planning the number of workers in 2004 in mining organization.Personal planning is very demanding for time, human and financial sources. When their creators will sufficiently understand every internal and external factors in a process of personal planning, they can very effectively predict tactical and strategical needs of their organization.

  13. The Search Conference as a Method in Planning Community Health Promotion Actions

    Science.gov (United States)

    Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica

    2016-01-01

    Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives. Significance for public health This article describe and discuss how the Search conference can be used as a method when working with knowledge based health promotion actions in local communities. The article describe the sequences of the conference and shows how this have been adapted when planning and prioritizing health promotion actions in three Norwegian municipalities. The significance of the article is that it shows how central elements in the planning of health promotion actions, as participation and involvements as well as evidence was a fundamental thinking in how the conference were accomplished. The article continue discussing how the method function as both a top-down and a bottom-up strategy, and in what way working evidence based can be in conflict with a bottom-up strategy. The experiences described can be used as guidance planning knowledge based health promotion actions in communities. PMID:27747199

  14. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  15. Review and action plan for oral health improvement in Sheffield special schools.

    Science.gov (United States)

    Worsley, D J; Jones, K; Harris, J C; Charlesworth, J; Marshman, Z

    2018-03-01

    A description of the process of a review of oral health improvement in special schools in Sheffield and the implementation of an action plan for these activities. Public health competencies encompassed: assessing the evidence on oral health and dental interventions, programmes and services; strategic leadership and collaborative working for health; oral health improvement. Copyright© 2018 Dennis Barber Ltd.

  16. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control.

    Science.gov (United States)

    de Bruijn, Gert-Jan; Wiedemann, Amelie; Rhodes, Ryan E

    2014-09-01

    In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to investigate distributions and predictors of fruit intake intention-behaviour discordance. Prospective correlational design. Data were obtained from undergraduate students (n = 413) using validated questionnaires. Variables from the theory of planned behaviour, automaticity, and action planning were assessed at baseline, and fruit intake was assessed 2 weeks later. Data were analysed using discriminant function analyses and analyses of variance. The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. There was a larger proportion of fruit intake intenders amongst those who reported strong automatic fruit intake. Action control was predicted by fruit intake automaticity and affective attitudes, but the strongest predictor was perceived behavioural control. No action planning items were related to fruit intake action control. There is considerable asymmetry in the intention-fruit intake relationship. An application of the action control framework may stimulate debate on the applicability of intention-based models at the public health level. What is already known on this subject? Intention is theorized to be a key construct in fruit intake. Studies in the physical activity domain indicate that nearly half of the people with positive intentions fail to subsequently act. What does this study add? The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. Holding positive intentions is not sufficient to consume fruit at suggested public health guidelines. Perceived behavioural control is the most important predictor of fruit intake action control. © 2013 The British Psychological Society.

  17. Action plan for 1965, Annex 2; Prilog br. 2 - Plan zadataka u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-12-15

    Action plan presented in this annex includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building. [Serbo-Croat] Plan zadataka obuhvata aktivnosti masinske i elektro grupe na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA.

  18. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  19. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures

  20. Documentation of a model action plan to deter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Kristo, M.J.; Niemeyer, S.; Dudder, G.B.

    2008-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)

  1. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  2. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  3. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  4. Climate change in Nova Scotia : a background paper to guide Nova Scotia's climate change action plan

    International Nuclear Information System (INIS)

    2007-10-01

    Climate change causes changes in the temperature of the earth, the level of the sea, and the frequency of extreme weather conditions. The province of Nova Scotia recently released an act related to environmental goals and sustainable prosperity. Addressing climate change is a key element in achieving Nova Scotia's sustainable prosperity goals outlined in the act. The Nova Scotia Department of Energy is working towards developing both policy and action, to help meet its target of a 10 per cent reduction in greenhouse gases from 1990 levels by the year 2020. Two major plans are underway, notably a climate change action plan and a renewed energy strategy. This report provided background information on Nova Scotia's climate change action plan. It discussed climate change issues affecting Nova Scotia, air pollutants, energy sources in Nova Scotia, energy consumers in the province, and Nova Scotia's approach to climate change. The report also discussed actions underway and funding sources. It was concluded that in order for the climate change action plan to be successful, Nova Scotians must use energy more efficiently; use renewable energy; use cleaner energy; and plan for change. 13 refs., 2 tabs., 6 figs., 4 appendices

  5. Draft IAEA Action Plan on Nuclear Safety. Report by the Director General

    International Nuclear Information System (INIS)

    Amano, Y.

    2011-01-01

    In accordance with paragraphs 23 and 24 of the Declaration adopted by the Ministerial Conference on Nuclear Safety held on 20-24 June 2011, the Director General was requested to prepare and present to the Board of Governors and the General Conference at their September 2011 meetings a report on the Ministerial Conference and a draft Action Plan, building on the Ministerial Declaration, the conclusions and recommendations of the working sessions of the Ministerial Conference and the expertise and knowledge available therein, and to facilitate consultations among Member States on the draft Action Plan. This draft Action Plan is the result of an extensive process of consultations with Member States and responds to the request contained in the Ministerial Declaration.

  6. Representation and Integration: Combining Robot Control, High-Level Planning, and Action Learning

    DEFF Research Database (Denmark)

    Petrick, Ronald; Kraft, Dirk; Mourao, Kira

    We describe an approach to integrated robot control, high-level planning, and action effect learning that attempts to overcome the representational difficulties that exist between these diverse areas. Our approach combines ideas from robot vision, knowledgelevel planning, and connectionist machine......-level action specifications, suitable for planning, from a robot’s interactions with the world. We present a detailed overview of our approach and show how it supports the learning of certain aspects of a high-level lepresentation from low-level world state information....... learning, and focuses on the representational needs of these components.We also make use of a simple representational unit called an instantiated state transition fragment (ISTF) and a related structure called an object-action complex (OAC). The goal of this work is a general approach for inducing high...

  7. Empowering the child and caregiver: yellow zone Asthma Action Plan.

    Science.gov (United States)

    Dinakar, Chitra; Portnoy, Jay M

    2014-11-01

    Current guidelines, both national and international, elegantly describe evidence-based measures to attain and maintain long-term control of asthma. These strategies, typically discussed between the provider and patient, are provided in the form of written (or electronic) instructions as part of the green zone of the color-coded Asthma Action Plan. The red zone of the Asthma Action Plan has directives on when to use systemic corticosteroids and seek medical attention. The transition zone between the green zone of good control and the red zone of asthma exacerbation is the yellow zone. This zone guides the patient on self-management of exacerbations outside a medical setting. Unfortunately, the only recommendation currently available to patients per the current asthma guidelines is the repetitive use of reliever bronchodilators. This approach, while providing modest symptom relief, does not reliably prevent progression to the red zone. In this document, we present new, evidence-based, yellow zone intervention options.

  8. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  9. Uranium mill tailings remedial action project real estate management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence

  10. Local climate action plans in climate change mitigation

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2016-01-01

    the extent, targets and scope of LG CAPs and find that Danish LGs are highly involved in mitigation activities with a widespread CAP adoption and an overall high degree of sectoral coverage on base year accounts and action plans, albeit with some significant shortcomings. Different approaches for target...... and scope definition are identified and assessed, and the overall contribution of LGs to the Danish energy transition is discussed....

  11. Uranium mill tailings remedial action project real estate management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  13. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  14. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  15. Education issues in disaster medicine: summary and action plan.

    Science.gov (United States)

    Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B

    2001-01-01

    Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.

  16. Motivations for self-regulation: The clean air action plan

    International Nuclear Information System (INIS)

    Giuliano, Genevieve; Linder, Alison

    2013-01-01

    In the fall of 2006 the Ports of Long Beach and Los Angeles announced the Clean Air Action Plan (CAAP). Its intent was to greatly accelerate emissions reductions from port activities. The CAAP was unprecedented in several ways: it was a voluntary agreement between two competing ports; it was achieved with the cooperation of local, state and federal agencies; it promised large particulate emissions reductions along with continued port growth, and it had a price tag of $2.1 billion. What explains the Ports’ decision to implement the CAAP? We conduct a case study to explore alternative explanations for the CAAP. Using data from interviews, media, and the history of events leading up to the CAAP, we find that the CAAP was a strategic response to social and political pressures that had built up over the previous decade. Its intent was to respond to local concerns and reduce opposition to port growth. The CAAP represents an example of the potential of voluntary efforts to solve environmental problems. - Highlights: • We conduct a case study of self-regulation for emissions reduction at seaports in Southern California. • We examine motivations for implementing the Clean Air Action Plan. • We find that social and political pressures were the main motivators, with regulatory threats a contributing factor. • The Clean Air Action Plan is a powerful example of the potential of voluntary strategies

  17. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  18. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    David Strand

    2006-01-01

    contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval

  19. Empowering Youth Work Supervisors with Action Research Strategies

    Science.gov (United States)

    Herman, Margo

    2012-01-01

    Supervising youth workers is a challenging, demanding job in a complex field. Too frequently youth workers get mired in reacting to the everyday crises that dominate their work, finding it difficult to rise above the daily demands to reach a place where reflection can help guide their work. Strategies based in action research can empower youth…

  20. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  1. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the 'Federal Facility Agreement and Consent Order' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions

  2. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  3. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  4. Effects of action video game training on visual working memory.

    Science.gov (United States)

    Blacker, Kara J; Curby, Kim M; Klobusicky, Elizabeth; Chein, Jason M

    2014-10-01

    The ability to hold visual information in mind over a brief delay is critical for acquiring information and navigating a complex visual world. Despite the ubiquitous nature of visual working memory (VWM) in our everyday lives, this system is fundamentally limited in capacity. Therefore, the potential to improve VWM through training is a growing area of research. An emerging body of literature suggests that extensive experience playing action video games yields a myriad of perceptual and attentional benefits. Several lines of converging work suggest that action video game play may influence VWM as well. The current study utilized a training paradigm to examine whether action video games cause improvements to the quantity and/or the quality of information stored in VWM. The results suggest that VWM capacity, as measured by a change detection task, is increased after action video game training, as compared with training on a control game, and that some improvement to VWM precision occurs with action game training as well. However, these findings do not appear to extend to a complex span measure of VWM, which is often thought to tap into higher-order executive skills. The VWM improvements seen in individuals trained on an action video game cannot be accounted for by differences in motivation or engagement, differential expectations, or baseline differences in demographics as compared with the control group used. In sum, action video game training represents a potentially unique and engaging platform by which this severely capacity-limited VWM system might be enhanced.

  5. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  6. Creating healthy work in small enterprises - from understanding to action

    DEFF Research Database (Denmark)

    Stephen, Legg; Ian S., laird; Olsen, Kirsten Bendix

    2014-01-01

    Although much is known about small and medium enterprises (SMEs), our current knowledge and understanding of occupational health and safety (OHS) and the work environment in SMEs is limited. Far less is known about how SMEs put our knowledge of OSH into action. In short, how do we create healthy...... work and healthy lives as well as ‘healthy business' in SMEs? The present paper, which also acts as an editorial for this special issue, addresses these questions by providing a summary of current knowledge - our understanding - about how to create healthy work and healthy lives for workers and owner......-managers in SMEs whilst concurrently also aiming to create a healthy business (in terms of profitability and sustainability). This paper and the special issue also emphasise the need to convert this knowledge into action - ‘from understanding to action'....

  7. Increasing advance personal planning: the need for action at the community level.

    Science.gov (United States)

    Waller, Amy; Sanson-Fisher, Rob; Ries, Nola; Bryant, Jamie

    2018-05-09

    Advance personal planning is the process by which people consider, document and communicate their preferences for personal, financial and health matters in case they lose the ability to make decisions or express their wishes in the future. Advance personal planning is most often undertaken by individuals who are seriously ill, often in the context of a medical crisis and/or at the time of admission to hospital. However, the clinical utility and legal validity of the planning process may be compromised in these circumstances. Patients may lack sufficient capacity to meaningfully engage in advance personal planning; there may be insufficient time to adequately reflect on and discuss wishes with key others; and there may also be limited opportunity for inter-professional input and collaboration in the process. Here, we propose an agenda for research to advance the science of advance personal planning by promoting a 'whole community' approach. Adoption of advance personal planning at a community level may be achieved using a variety of strategies including public media campaigns, intervening with professionals across a range of health care and legal settings, and mobilising support from influential groups and local government. One potentially promising method for encouraging earlier adoption of advance personal planning among a broader population involves a community action approach, whereby multiple evidence-based strategies are integrated across multiple access points. Community action involves calling on community members, professionals, community and/or government organisations to work collaboratively to design and systematically implement intervention strategies with the aim of bringing about desired behaviour change. An example of a community action trial to improving uptake and quality of advance personal planning is described. While promising, there is a need for rigorous evidence to demonstrate whether a community action approach is effective in

  8. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  9. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  10. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  11. Corrective action investigation plan for Corrective Action Unit Number 427: Area 3 septic waste system numbers 2 and 6, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Compound, specifically Corrective Action Unit (CAU) Number 427, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Corrective Action Unit Work Plan, Tonopah Test Range, Nevada divides investigative activities at TTR into Source Groups. The Septic Tanks and Lagoons Group consists of seven CAUs. Corrective Action Unit Number 427 is one of three septic waste system CAUs in TTR Area 3. Corrective Action Unit Numbers 405 and 428 will be investigated at a future data. Corrective Action Unit Number 427 is comprised of Septic Waste Systems Number 2 and 6 with respective CAS Numbers 03-05-002-SW02 and 03-05-002-SW06

  12. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  13. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  14. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    International Nuclear Information System (INIS)

    Pastor, Laura

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI

  15. Developing Effective Corrective Action Plan in Krsko NPP

    International Nuclear Information System (INIS)

    Bach, Bruno; Cizmek, Rudi; Bozin, Bojan

    2014-01-01

    OE program regarding to developing effective and efficient corrective action plan based both on internal and industry events. It will describe the key steps of developing, implementing and assessing the effectiveness of corrective actions that address issues identified in the OE program and includes the following aspects: a. Developing effective corrective actions, b. Prioritizing corrective actions, c. Implementing corrective actions successfully, d. Assessing the effectiveness of the corrective actions. (authors)

  16. The Work Compatibility Improvement Framework: theory and application of improvement action and intervention strategies.

    Science.gov (United States)

    Genaidy, Ash M; Rinder, Magda M; Sequeira, Reynold; A-Rehim, Amal D

    2009-05-01

    Challenges facing management of manufacturing firms can be transformed into asset gains by giving careful consideration to the worker-work environment interface. The benefits of a 'healthy' interface may lead to sizable reductions in rising health care costs and retention of highly qualified workers. This paper presents a novel approach for the 'improve' phase of the Work Compatibility Improvement Framework. The work tasks of this research consisted of: (a) fundamentals of cognitive-based improvement action and intervention; (b) design concepts and process of improvement action/intervention generation; (c) assessment model of estimated gains in company's assets; (d) application demonstration in the manufacturing sector. The process of improvement action/intervention generation is described, preceded by a description of the fundamentals of cognitive-based improvement action and intervention and system architecture. This is followed by a documentation of estimated asset gains as a result of the improvement plan. The results showed that expert workers were, on average, 78% in agreement with the algorithm-identified improvement actions. Their knowledge was used to update the recommended actions as well as to detail the multiple strategies required to address the improvement actions. As a result, an integrated improvement plan was developed resulting in estimated asset gains of $1.6 million, which was validated by the general manager. The research reported herein documented the theory and application of the 'improve' phase of the Work Compatibility Improvement Framework. The economic assessment of the suggested improvement is also reported and this has proved to be an important driver to secure the firm collaboration of manufacturing enterprise management. An integrated improvement solution plan backed by a detailed economic assessment of suggested improvements is essential to demonstrate the full potential of workplace micro- and macro-ergonomic interventions.

  17. Working memory and the control of action: evidence from task switching.

    Science.gov (United States)

    Baddeley, A; Chincotta, D; Adlam, A

    2001-12-01

    A series of 7 experiments used dual-task methodology to investigate the role of working memory in the operation of a simple action-control plan or program involving regular switching between addition and subtraction. Lists requiring switching were slower than blocked lists and showed 2 concurrent task effects. Demanding executive tasks impaired performance on both blocked and switched lists, whereas articulatory suppression impaired principally the switched condition. Implications for models of task switching and working memory and for the Vygotskian concept of verbal control of action are discussed.

  18. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  19. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  20. Proceedings of the Radon national action plan workshop

    International Nuclear Information System (INIS)

    Chevet, Pierre-Franck; Godet, Jean-Luc; Tirmarche, Margot; Strand, Per; Mrdakovic Popic, Jelena; Dysvik, Solveig; Skjold, Anne Marit; Vallet, Benoit; Van Deventer, Emilie; Colgan, Tony; ); Mundigl, Stefan; ); Magnusson, S.; Long, Bill; McBurney, Ruth; Thompson, P.A; Pollard, David; Fenton, David; Long, Stephanie; Dehandschutter, Boris; Murith, Christophe; Skeppstroem, Kirlna; Petrova, Karla; Davidkova, Jana; Pravdova, Eva; Kiselev, Sergey; Mc Coll, Neil; Vallet, Jeremie; Rannou, Alain; Kurttio, Paivi; Martinsen, Finn; Roulet, Claude-Alain; Goyette, Joelle; Frutos, Borja; Olaya, Manuel; Linares Alemparte, Pilar; Marinko, Janez; Garcia-Talavera, Marta; Pedrazzi, Lisa; Mc Laughlin, James; Gutierrez-Villanueva, Jose-Luis; Janssens, Augustin

    2015-01-01

    Following the publication of the new European Basic Safety Standards Directive (the Council Directive 2013/59/EURATOM ), published in January 2014, Member States of the European Union have 4 years to incorporate it and to prepare or update their strategy for reducing radon concentration and the associated national radon action plan. Under a joint initiative from ASN and NRPA, 20 European countries, represented by authorities in charge of Radiation Protection, Health, Labour and Housing and Landscaping were brought together during a workshop on national radon action plans. The objective of the workshop, held in ASN's premises, was to share the views and experiences concerning national strategies for reducing radon exposure of the population and associated lung cancer risk. The radon workshop was supported by the World Health Organisation (WHO), the International Atomic Energy Agency (IAEA), the Heads of European Radiation protection Control Authorities (HERCA) and the European Commission (EC). Authorities from USA (EPA, CRCPD), Canada (CNSC) and Russia (FMBA) and the European Radon Association (ERA) also participated in the workshop. This radon workshop has offered the opportunity to compare the actions in place or in preparation in different countries aiming at reducing radon exposure in home and dwellings, in buildings with public access (i.e. schools) and in workplaces. Preventive and corrective solutions, associated with incentives and communication to increase the public awareness, as well as education and training actions for different actors concerned, have been presented and discussed. The question about the relative place of regulation in the national strategy has been considered as an important key point. This document brings together the presentations (slides) given at the workshop. The main conclusions of the workshop are presented at the end of the document

  1. Restructuring: A School-Based Plan of Action.

    Science.gov (United States)

    Rothberg, Robert A.; Bozeman, William C.

    The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…

  2. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  3. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  4. Quality Assurance Plan, N springs expedited response action

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1994-01-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986)

  5. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  6. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  7. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  8. The Representation of Action Plans in Long Term Memory

    Science.gov (United States)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  9. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  10. The Organization of Working Time: Developing an Understanding and Action Plan to Promote Workers' Health in a Seasonal Work Context: L'organisation temporelle du travail: la comprendre pour développer des actions favorisant la santé des travailleuses en contexte de travail saisonnier.

    Science.gov (United States)

    Major, Marie-Eve; Vézina, Nicole

    2017-11-01

    Despite the health problems associated with irregular schedules and long working hours, few studies have focused on the temporal dimension of work in seasonal working contexts. Through the monitoring of sixteen seasonal workers in the crab-processing industry over a two-year period, this study aimed to better understand their working reality and to provide a detailed picture of the temporal dimension of seasonal work as experienced by these workers. Observations of the work activity, interviews, and analysis of official documents were carried out. The findings reveal that the organization of working time and working conditions are very restrictive. These constraints are linked not only to the work environment and management but also to various public policies and ministerial directives. Methodological elements essential for the study of the organization of working time have been identified and could contribute to a better understanding of temporal constraints experienced by seasonal workers. Résumé Malgré les problèmes de santé associés aux horaires non standards et aux longues heures de travail, peu d'études se sont attardées à dégager un portrait de la dimension temporelle du travail en contexte de travail saisonnier. Par le suivi de 16 travailleuses saisonnières de l'industrie de la transformation du crabe pendant deux années, cette étude visait à mieux comprendre leur réalité de travail et à dresser un portrait détaillé de la dimension temporelle du travail saisonnier tel que vécu par ces travailleuses. Des observations du travail, des entretiens et l'analyse de documents ont été réalisés. Les résultats révèlent une organisation temporelle et des conditions de travail fort contraignantes pour ces travailleuses liées, entre autres, à l'environnement et à la gestion du travail, mais également à diverses politiques publiques et consignes ministérielles. Des éléments méthodologiques essentiels pour l'étude des temps de travail

  11. The G8 summit of Gleneagles (July 6-8, 2005) - the energy-climate action plan - the France-Algeria cooperation. The works of the national commission of the public debate about energy - the management of nuclear wastes - the EPR at Flamanville - the Cotentin-Maine VHV line. The oil prices surge during summer 2005, national and international reactions

    International Nuclear Information System (INIS)

    Lamy, J.; Locufier, A.; Vincent, C.; Bros, Th.; Delmestre, N.; Noilban, F.; Quintaine, Th.; Perrin, J.L.; Branche, Th.; Barthe, F.

    2006-01-01

    This issue of Energies et matieres premieres newsletter comprises five articles dealing with: 1 - the energy-climate action plan adopted by the presidents of the 8 more industrialized countries of the world (G8) during the Gleneagles summit (Scotland) in July 6-8, 2005. This action plan was discussed in association with five emerging countries, among the biggest energy consumers in the world; 2 - the works carried out by the national commission of the public debate on energy about the management of radioactive wastes. The article recalls the 3 axes of research (separation-transmutation, underground disposal and surface or sub-surface storage) and the planning of the preparation of the future project of radioactive management law which will be examined by the European parliament during the second quarter of 2006; 3 - the public debate about the setting up of the European pressurized reactor (EPR) at Flamanville (Cotentin, France); 4 - the public debate about the project of very-high voltage power line between Flamanville and Maine region for the reinforcement of the regional power grid; and 5 - the national and international reactions in front of the surge of oil prices during summer 2005. (J.S.)

  12. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within 90...

  13. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  14. North Slope (Wahluke Slope) expedited response action cleanup plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  15. North Slope (Wahluke Slope) expedited response action cleanup plan

    International Nuclear Information System (INIS)

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi 2 (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives

  16. Kinesthetic working memory and action control within the dorsal stream.

    Science.gov (United States)

    Fiehler, Katja; Burke, Michael; Engel, Annerose; Bien, Siegfried; Rösler, Frank

    2008-02-01

    There is wide agreement that the "dorsal (action) stream" processes visual information for movement control. However, movements depend not only on vision but also on tactile and kinesthetic information (=haptics). Using functional magnetic resonance imaging, the present study investigates to what extent networks within the dorsal stream are also utilized for kinesthetic action control and whether they are also involved in kinesthetic working memory. Fourteen blindfolded participants performed a delayed-recognition task in which right-handed movements had to be encoded, maintained, and later recognized without any visual feedback. Encoding of hand movements activated somatosensory areas, superior parietal lobe (dorsodorsal stream), anterior intraparietal sulcus (aIPS) and adjoining areas (ventrodorsal stream), premotor cortex, and occipitotemporal cortex (ventral stream). Short-term maintenance of kinesthetic information elicited load-dependent activity in the aIPS and adjacent anterior portion of the superior parietal lobe (ventrodorsal stream) of the left hemisphere. We propose that the action representation system of the dorsodorsal and ventrodorsal stream is utilized not only for visual but also for kinesthetic action control. Moreover, the present findings demonstrate that networks within the ventrodorsal stream, in particular the left aIPS and closely adjacent areas, are also engaged in working memory maintenance of kinesthetic information.

  17. The IAEA and Y2K. The Agency's action plan on the year 2000 problem

    International Nuclear Information System (INIS)

    Cherif, H.S.; Winkels, J.

    1999-01-01

    The article describes the aims of it IAEA action plan concerned with Year 2000 (Y2K) problem and the results achieved during four years of work, including the technical documents dealing with the Y2K computer problem, published by IAEA. This include IAEA systems and operations, contingency plans, coordination in the United Nations system. Through the IAEA Internet site, a series of Web pages were developed by the Division of Public Information to co-ordinate the global exchange of information on the IAEA Y2K activities and related topics. The site is open to Member States and international organisations within and outside United Nations system

  18. Selective weighting of action-related feature dimensions in visual working memory.

    Science.gov (United States)

    Heuer, Anna; Schubö, Anna

    2017-08-01

    Planning an action primes feature dimensions that are relevant for that particular action, increasing the impact of these dimensions on perceptual processing. Here, we investigated whether action planning also affects the short-term maintenance of visual information. In a combined memory and movement task, participants were to memorize items defined by size or color while preparing either a grasping or a pointing movement. Whereas size is a relevant feature dimension for grasping, color can be used to localize the goal object and guide a pointing movement. The results showed that memory for items defined by size was better during the preparation of a grasping movement than during the preparation of a pointing movement. Conversely, memory for color tended to be better when a pointing movement rather than a grasping movement was being planned. This pattern was not only observed when the memory task was embedded within the preparation period of the movement, but also when the movement to be performed was only indicated during the retention interval of the memory task. These findings reveal that a weighting of information in visual working memory according to action relevance can even be implemented at the representational level during maintenance, demonstrating that our actions continue to influence visual processing beyond the perceptual stage.

  19. Using Action Research to prevent work-related illness among rubber farmers in Northeastern Thailand.

    Science.gov (United States)

    Sena, Wijitra; Nilvarangkul, Kessarawan; Saranrittichai, Kesinee; Smith, John F; Phajan, Teerasak; Seetangkham, Sansanee

    2018-06-10

    This research aimed to enhance self-care among rubber farmers for preventing work-related illness. The project used Action Research's four phase iterative process: fact-finding to understand the problems, action planning, action plan implementation, and evaluation and reflection on action plan impacts. Sixty-six participants (46 rubber farmers and 20 community stakeholders) were purposively recruited from two villages in the top 10 rubber producing provinces in Northeastern Thailand. Demographic and work-related illness data were collected in face-to-face structured interviews, Focus group interviews and participant observations were used to collect data in each project phase. Night group meetings were held throughout the research phases. The intervention included training workshops and establishing a community health education team for ongoing farmer support. Results showed improved farmer self-care behaviors and establishment of a community health education team to encourage farmers to care for themselves properly. Community nurses, other health personnel, and the Thai government can build on initiatives like this to strengthen occupational health and safety practices and services policy for rubber farmers. © 2018 Wiley Periodicals, Inc.

  20. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  1. The U.S. National Action Plan to Improve Health Literacy: A Model for Positive Organizational Change.

    Science.gov (United States)

    Baur, Cynthia; Harris, Linda; Squire, Elizabeth

    2017-01-01

    This chapter presents the U.S. National Action Plan to Improve Health Literacy and its unique contribution to public health and health care in the U.S. The chapter details what the National Action Plan is, how it evolved, and how it has influenced priorities for health literacy improvement work. Examples of how the National Action Plan fills policy and research gaps in health care and public health are included. The first part of the chapter lays the foundation for the development of the National Action Plan, and the second part discusses how it can stimulate positive organizational change to help create health literate organizations and move the nation towards a health literate society.

  2. Actionable findings and the role of IT support: report of the ACR Actionable Reporting Work Group.

    Science.gov (United States)

    Larson, Paul A; Berland, Lincoln L; Griffith, Brent; Kahn, Charles E; Liebscher, Lawrence A

    2014-06-01

    The ACR formed the Actionable Reporting Work Group to address the potential role of IT in the communication of imaging findings, especially in cases that require nonroutine communication because of the urgency of the findings or their unexpected nature. These findings that require special communication with referring clinicians are classified as "actionable findings." The work group defines 3 categories of actionable findings that require, respectively, communication and clinical decision within minutes (category 1), hours (category 2), or days (category 3). Although the work group does not believe that there can be definitive lists of such findings, it developed lists in each category that would apply in most general hospital settings. For each category, the work group discusses ways in which IT can assist interpreting radiologists in successfully communicating to the relevant clinicians to ensure optimal patient care. IT systems can also help document the communication and facilitate auditing of the documentation. The work group recommends that vendors develop platforms that can be customized on the basis of local preferences and needs. Whatever system is used, it should be highly reliable and fit seamlessly into radiologists' workflow. Copyright © 2014 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  3. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  4. Assessing and Planning Health Actions During a Crisis

    Directory of Open Access Journals (Sweden)

    Selim SUNER

    2015-10-01

    Full Text Available SUMMARY: Initial stage of a disaster is managed with existing resources. The following stages of disaster response often involve assistance from outside of the disaster zone. This may consist of mutual aid from neighboring communities for small-scale incidents but in major disasters, the response is from federal or international agencies or often both. Rapid needs assessment after an incident is a collaborative effort between responding agencies and local emergency preparedness and health authorities. Ideally, a team from responding agencies with intimate knowledge and experience regarding the capabilities and assets of the responding entity along with local authorities, with decision making capacity, who have knowledge of the community, the limitations of the responding agencies and can obtain near real-time information about the incident and subject matter experts (engineering, medical, law enforcement, etc. comprise the needs assessment team. Keywords: Crisis, health action, disaster planning

  5. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  6. Interest Deductibility and the BEPS Action Plan: nihil novi sub sole?

    OpenAIRE

    Traversa, Edoardo

    2013-01-01

    Interest payments between affiliated companies which aim at shifting profit from high to low tax countries are a well-known and frequently used tool in international tax planning. It is therefore not surprising that in the OECD Action Plan on Base Erosion and Profit Shifting (BEPS) (Action Plan) considerable attention is given to the measures limiting the deductibility of (excessive) intra-group interest payments.1 The Action Plan does not, however, provide any clear guidance as to which, amo...

  7. Scales, strategies and actions for effective energy planning: A review

    International Nuclear Information System (INIS)

    Pasimeni, Maria Rita; Petrosillo, Irene; Aretano, Roberta; Semeraro, Teodoro; De Marco, Antonella; Zaccarelli, Nicola; Zurlini, Giovanni

    2014-01-01

    This paper is a review of the most recent literature on the interaction between climate change, land-use and energy, based on the analysis of papers collected through the most relevant scientific literature databases. A total of 114 papers published between 2000 and 2011 were reviewed. The aims of this review are: in general (1) to identify the different research topics that have been developed related to the interaction between climate change, land-use and energy; more specifically, (2) to analyze what are the most suitable spatial and temporal scales of investigation to focus on for actions and strategies to reduce critical issues in the field of energy and environment; (3) to identify which actions and strategies are deemed as the most appropriate to mitigate critical issues in energy and environment; and given the research gaps found in the review, (4) to propose research recommendations in the context of effective climate-energy planning. We argue that there are certain gaps and needs for a “nested” environmental governance. It is necessary to understand how different environmental policies overlap and how they can be integrated in order to verify whether there are conflicting targets that may negate each other in the long term. - Highlights: • Energy production and consumption can directly or indirectly affect climate change. • Energy sector is influenced directly and indirectly by changes in climate conditions. • Energy sector and climate change affect and limit alternative uses of land, causing land-use changes. • The most suitable spatial scale for energy planning is the municipal level requiring short-term perspectives. • Several research recommendations to deal with the complexity of energy-land-use-climate change issue are proposed

  8. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  9. Reducing greenhouse gas emissions: Lessons from state climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Pollak, Melisa, E-mail: mpollak@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Meyer, Bryn, E-mail: meye1058@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Wilson, Elizabeth, E-mail: ewilson@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States)

    2011-09-15

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: > This study analyzed climate action plans from 12 states and surveyed the advisory group members. > Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. > Advisory group members perceived different opportunities and risks in the top-ten strategies. > Both geographic and socio-political factors may underlie the varying reliance on certain strategies. > Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  10. Reducing greenhouse gas emissions: Lessons from state climate action plans

    International Nuclear Information System (INIS)

    Pollak, Melisa; Meyer, Bryn; Wilson, Elizabeth

    2011-01-01

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: → This study analyzed climate action plans from 12 states and surveyed the advisory group members. → Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. → Advisory group members perceived different opportunities and risks in the top-ten strategies. → Both geographic and socio-political factors may underlie the varying reliance on certain strategies. → Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  11. Is perceived motor competence a constraint in children's action planning?

    Science.gov (United States)

    Gabbard, Carl; Caçola, Priscila; Cordova, Alberto

    2009-06-01

    A form of action representation of developmental interest is reach estimation-the perceptual and cognitive judgment of whether an object is within or out of reach. A common observation among children is overestimation, which, speculatively, has been linked to perceived motor competence (PMC). The authors examined the PMC effect on reachability among 7-, 9-, and 11-year-old children. The authors predicted that with higher PMC, participants would display greater overestimation and that this outcome would show a developmental trend with younger children displaying greater overestimation complementing higher PMC scores. Results revealed no age differences in total error for reach, and all age groups overestimated. Regarding PMC, the 7-year-old childrens' scores were significantly higher than those of their older counterparts. However, relation analyses revealed no support for the idea that PMC was significantly associated with reachability. The findings suggested that a general measure of PMC is not a good predictor of childrens' action planning through reach estimation. Furthermore, if PMC in some form is a psychological constraint, future studies should be tied to context-specific measures of perceived abilities in relation to the specificity of the task.

  12. World Health Organization Global Disability Action Plan: The Mongolian Perspective

    Directory of Open Access Journals (Sweden)

    Fary Khan

    2017-01-01

    Full Text Available Objective: To provide an update on disability and rehabilitation in Mongolia, and to identify potential barriers and facilitators for implementation of the World Health Organization (WHO Global Disability Action Plan (GDAP. Methods: A 4-member rehabilitation team from the Royal Melbourne Hospital conducted an intensive 6-day workshop at the Mongolian National University of Medical Sciences, for local healthcare professionals (n = 77 from medical rehabilitation facilities (urban/rural, public/private and non-governmental organizations. A modified Delphi method (interactive sessions, consensus agreement identified challenges for rehabilitation service provision and disability education and attitudes, using GDAP objectives. Results: The GDAP summary actions were considered useful for clinicians, policy-makers, government and persons with disabilities. The main challenges identified were: limited knowledge of disability services and rehabilitation within healthcare sectors; lack of coordination between sectors; geo-topographical issues; limited skilled workforces; lack of disability data, guidelines and accreditation standards; poor legislation and political commitment. The facilitators were: strong leadership; advocacy of disability-inclusive development; investment in local infrastructure/human resources; opportunities for coordination and partnerships between the healthcare sector and other stakeholders; research opportunities; and dissemination of information. Conclusion: Disability and rehabilitation is an emerging priority in Mongolia to address the rights and needs of persons with disabilities. The GDAP provides guidance to facilitate access and strengthen rehabilitation services.

  13. [Development of human resources and the Plan of Action].

    Science.gov (United States)

    Vidal, C

    1984-01-01

    This article (whose first part was published in the previous issue of Educación Médica y Salud) concludes an exhaustive review of manpower development in the Americas. This part considers the specific measures in this field enunciated in the Plan of Action; these measures pertain to four main areas: planning and programming of human resources, training in priority areas, utilization of human resources, and educational technology. The author discusses the present and future possibilities and obstacles of each of these activities and the steps to be taken to bring needs into line with real situations. It is of paramount importance that the national health authorities clearly spell out their policies for the development of human resources in the health field within the framework of general development policies. Another point to be insisted upon is the multiprofessional and multidisciplinary training of the health team and the importance of the education-service-supervision function, which usually results in permanent and continuing education, which in turn optimizes the utilization of personnel. However, none of this will be possible without an appropriate education technology with which to innovate, analyze and refine the entire education process and so meet the needs of both society and the health services.

  14. Water Planning and Climate Change: Actionable Intelligence Yet?

    Science.gov (United States)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  15. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    Energy Technology Data Exchange (ETDEWEB)

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by

  16. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    Science.gov (United States)

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  17. Plan d'action pour la conservation des espèces d'oiseaux inscrites ...

    African Journals Online (AJOL)

    This List includes fifteen species of bird, and at the thirteenth Conference of the Parties in Catania, Sicily in November 2003, an Action Plan for the conservation of these species was adopted, following similar plans on monk seal, marine turtles, cetaceans and marine vegetation. The Action Plan for Birds notes initiatives ...

  18. Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)

    International Nuclear Information System (INIS)

    Beck, J.E.; Ison, S.A.

    1994-01-01

    This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completion of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions

  19. Migration plans and hours of work in Malaysia.

    Science.gov (United States)

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  20. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  1. Space Weather Action Plan Solar Radio Burst Phase 1 Benchmarks and the Steps to Phase 2

    Science.gov (United States)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Love, J. J.; Pierson, J.

    2017-12-01

    Solar radio bursts, when at the right frequency and when strong enough, can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The benchmark team has developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks, the basis used to derive them, and the limitations of that work. We will also discuss the work that needs to be done to complete the phase 2 benchmarks.

  2. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  3. Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A...Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) DoD Component Air Force Responsible Office Program...APB) dated March 9, 2015 DCAPES Inc 2A 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments

  4. Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B...Information Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B) DoD Component Air Force Responsible Office...been established. DCAPES Inc 2B 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments (DCAPES) is

  5. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  6. Nuclear energy and global governance to 2030 : an action plan

    International Nuclear Information System (INIS)

    Frechette, L.; Findlay, T.; Brem, M.; Hanson, J.; Bunch, M.; McCausland, T.

    2010-01-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  7. LEAP: local environmental action plan. Municipality of Sopishte

    International Nuclear Information System (INIS)

    2004-01-01

    The establishment of the Municipality of Sopishte was preceded by the development of a kind of suburban settlement of Skopje, basically composed of illegally constructed individual houses for living. As a result from economic activities in the Municipality and the impacts from human factor, there are problems related to the disturbance of the quality of the basic environmental quality factors (water, air and soil), as well as threat to biological diversity and natural values and rarities. The Municipality of Sopishte is situated in hilly-mountain area. Significant sources of air pollution have not been recorded (in terms of industrial facilities) caused by the household neglectible air pollution caused by traffic. The Municipality is very poor in water resources. Almost 90% of the Municipality's territory are without river or stream. A potential source of water supply in this area is the river of Patishka, which is currently not used for water supply purposes. The solid waste, generated basically by the households, is not properly disposed (most frequently dumped on illegal dumping sites on the territory of the Municipality) and represents a serious problem making impacts on the quality of the environment. On the basis of the evaluation of identified environmental problems, priority activities required to be undertaken in short and medium term have been set up. Financial constrains have been taken into account in this regard. The proposed Action Plan reflects the observed needs of the population of the Municipality of Sopishte and the perception of the key problems

  8. Nuclear energy and global governance to 2030 : an action plan

    Energy Technology Data Exchange (ETDEWEB)

    Frechette, L.; Findlay, T. (comps.); Brem, M.; Hanson, J.; Bunch, M.; McCausland, T. (eds.)

    2010-07-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  9. Reducing our Carbon Footprint - an initial action plan for Northern Ireland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-14

    In the Energy White Paper, Our Energy Future - Creating a low carbon economy, the UK Government accepted the Royal Commission on Environmental Pollution's (RCEP) recommendations on how the UK should address the threat of climate change. These recommendations included the early development of a concerted, coordinated and integrated strategy across all Government Departments that would put the UK economy on an early path to reducing carbon dioxide (CO{sub 2}) emissions by at least 60% by 2050. Responding to this challenge, the Carbon Trust and Invest NI sponsored a project to develop an action plan that will set Northern Ireland on the path to realising the deep reductions in carbon emissions needed to reach this target. During the project, the prospects for reducing CO{sub 2} emissions (or carbon emissions) in five key sectors of the economy were examined. The main conclusion of this work was that it was possible to realise a 60% reduction in carbon emissions by 2050, provided early action is taken to set Northern Ireland on the path to a low carbon economy. The project also prepared an initial action plan to help initiate change. This consists of: Immediate actions, including encouraging the uptake of energy efficiency measures, revising building regulations and changing public procurement procedures. Developing options for the future, by supporting the exploitation of renewable resources, modifying the regulatory scheme to support combined heat and power (CHP) and encouraging additional investment in low carbon technologies. Cross-cutting actions, including developing planning procedures that take account of sustainability, marketing campaigns to capture hearts and minds, developing a skills base in low carbon technologies and exploring more radical ways of cutting carbon emissions. (UK)

  10. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005)

  11. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  12. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  13. Early actions in decontamination after nuclear power accidents, guidelines for planning

    International Nuclear Information System (INIS)

    Ulvsand, T.; Andersson, K.G.; Hansen, J.H.; Preuthun, J.; Sinkko, K.; Svennerstedt, G.; Uhnger, S.

    1997-01-01

    The target group for this document consists mainly of persons in charge of making plans for the actions in case of a radioactive release, persons found at different levels in the preparedness organisations. This report builds on a joint Nordic project, from which a basic report has been published (NKS-EKO--5(96)-18, INIS 28-021176), which is useful to experts. The work has extracted seven actions which can be classed as early: Hosing of roofs, walls, and paved areas; Lawn mowing; Pruning of trees and bushes; Removal of snow; and Vacuum cleaning of streets. For a reference deposition of 1 Mbq/m 2 of 137 Cs, calculations have been performed in five urban or suburban areas such as detached wooden or brick houses, semi-detached houses, terrace houses and city centre multi-storey houses. In case of dry or wet deposition, the report describes the expected effects of the various actions and the practical, economical and protective-relevant consequences generated by them. The actions giving the largest effects, measured as reduction in life time dose reduction, are lawn mowing, removal of snow and pruning of trees and bushes. The document finally discuss clean-up actions and their effects on the rural living environments. The actions will be the same as those taken in the urban areas, but there is a difference in the performance. In urban areas, the actions will to a great extent be performed by the society. In rural areas, the equipment and experience needed exist on the farms, and the inhabitants will perform the clean-up actions themselves

  14. PLAN Bicol, Philippines: health manpower development program in action.

    Science.gov (United States)

    Lind, K

    1994-06-01

    PLAN Bicol in the Philippines is a community based Health Manpower Development Program (HMDP) geared toward training and mobilization of indigenous health practitioners, providing infrastructural and logistical support to individual families, and educating the community about health, nutrition, and the environment. The field officer recommends at the initiation of a project that program staff have roles that are well defined. New programs should be introduced to the community first and should involve the community in the planning stages. The HMDP program is directed to 38 villages located around national parks that have suffered from deforestation. Community health issues are malnutrition, low immunization, and lack of access to health services. HMDP established a training program for auxiliary health workers (AHWs), who make a commitment to return to their villages after training. Midwives are being trained at local schools. Village houses are being built and repaired; water systems and sanitary toilet facilities are being installed. Village health stations have been constructed and equipped with basic medicines, supplies, and equipment, and are open 5 days a week. Health education classes inform the community about nutrition and health. The problems at inception were the unwillingness of field staff to participate in the program and a high drop out rate among AHWs. Problems were worked out as the program progressed. Facilitative factors are the close coordination with the provincial health office, community acceptance, and the availability of qualified people.

  15. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...

  16. Priority actions of the different Regional Prevention Plans: common features and innovations

    Directory of Open Access Journals (Sweden)

    Francesca Russo

    2013-06-01

    Full Text Available The National Prevention Plan (NPP 2010-2012, approved by the Agreement between the Government, the Regions and Autonomous Provinces of Trento and Bolzano on 29 April 2010, called for Regions to adopt, by 31/12/2010, the Regional Prevention Plan (RPP for implementing the interventions provided by the NPP 2010-2012.This article has considered and compared the different RPP’s. In an attempt to provide an outlook on the future medical prevention plans over the next few years in Italy, a comparison has been made between the RPP from 19 Regions and the Autonomous Province of Trento. This work has been focused on the actions identified in regional plans as a priority concerning the major common and innovative elements.The analysis of each RPP revealed a common plan to chronic degenerative diseases, because of the aging of the population in every Region of Italy. Other important common targets are: surveillance systems, vaccination programs and screening programs. Toscana and Liguria, more than other Regions, are engaged in the creation of networks involving various social actors. In some Regions there are projects aimed at eliminating social, economic or gender inequities, such as the project “women’s health” in the Region of Puglia. Toscana and Emilia-Romagna Plans pay attention to environment and pollution issues.Despite social, environmental and economic differences, the various Regions have common principles, concerning: life style, surveillance, vaccination and the screening for cancer.

  17. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... ensure that requested data can be provided in the desired format, reporting burden (time and financial... DEPARTMENT OF LABOR Comment Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements; Extension With Revisions AGENCY: Employment and Training Administration, DOL. ACTION...

  18. Significance of action plans in the development of occupational well-being in the schools of Finland and Estonia.

    Science.gov (United States)

    Laine, Sari; Saaranen, Terhi; Pertel, Tiia; Hansen, Siivi; Lepp, Kädi; Tossavainen, Kerttu

    2016-02-01

    This article is part of a long term project "Promoting the Occupational Well-Being of School Staff-Action Research Project in Finland and Estonia, 2009-2014." The purpose of this article is to describe the significance of action plans in the promotion of the occupational well-being of primary and upper secondary school staff in Finland and Estonia from 2010 to the turn of the year 2011-2012. An electronic open questionnaire was sent to occupational well-being groups in Finland (N=18) and in Estonia (N=39). In Finland, the questionnaire was responded to by 16 (n=16) occupational well-being groups, and in Estonia, by 38 (n=38) groups. The qualitative data were analyzed using the inductive-deductive method and content analysis. The obtained results indicate that the schools had named goals for action plans in all aspects of the promotion of occupational well-being in schools (worker and work, working conditions, professional competence, working community) and that these goals were mainly realized in the schools in a systematic way. Schools felt that the action plan for occupational well-being helped them to set goals for occupational well-being and that the planned actions were realized in a more systematic way than before. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  20. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  1. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  2. Clean Water Action Plan: Restoring and protecting America`s waters

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    On October 18, 1997, the 25th anniversary of the enactment of the Clean Water Act, the Vice President called for a renewed effort to restore and protect water quality. The Vice President asked that the Secretary of Agriculture and the Administrator of the Environmental Protection Agency (EPA), working with other affected agencies, develop a Clean Water Action Plan that builds on clean water successes and addresses three major goals: (1) enhanced protection from public health threats posed by water pollution; (2) more effective control of polluted runoff; and (3) promotion of water quality protection on a watershed basis.

  3. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  4. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  5. Readability, suitability, and characteristics of asthma action plans: examination of factors that may impair understanding.

    Science.gov (United States)

    Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P

    2013-01-01

    Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.

  6. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  7. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  8. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  9. Action planning and position sense in children with Developmental Coordination Disorder

    NARCIS (Netherlands)

    Adams, I.L.; Ferguson, G.D.; Lust, J.M.; Steenbergen, B.; Smits-Engelsman, B.C.M.

    2016-01-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were

  10. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    Science.gov (United States)

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  11. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  12. Air quality management: challenges and solutions in delivering air quality action plans

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, C.I.; Longhurst, J.W.S.; Woodfield, N.K.

    2000-07-01

    The Air Quality Strategy for England, Scotland, Wales and Northern Ireland (DETR, 2001) has the aim of showing how improved local air quality in the UK may be delivered. Through a process of reviewing and assessing local air quality in both urban and rural localities, a clear picture is emerging of areas of the UK where air quality objectives are not likely to be met. The next challenge will be the identification of the required actions and new ways of working to achieve specific air quality objectives. The declaration of air quality management areas, where objectives are not predicted to be met by their target years, involves co-ordinated local action and collaborative working, which can only be effective with support across local authority departments and external stake holders. This paper provides a background to the relevant legislation underpinning, local air quality management and summarises the review and assessment process. It then comments on future directions in relation to the designation of Air Quality Management Areas and considers the requirements of action plans to deliver the goal of cleaner air in the UK. It is concluded that the UK has developed a highly sophisticated system of air quality management over a relatively short period of time, and with it has brought a new way of local authority working. The challenge of the next stage of the process is likely to be in implementing cost effective and proportional solutions to identified problems at the local level. (Author)

  13. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  14. Survey of shark fisheries and preparation of a National Plan of Action (NPOA) for conservation and management of shark resources in Bangladesh

    OpenAIRE

    2014-01-01

    The report presents; terms of reference; work progress; surveys of shark fishers and traders; shark biodiversity survey; and a National Plan of Action (NPOA) for conservation and management of shark resources in Bangladesh.

  15. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    Energy Technology Data Exchange (ETDEWEB)

    Sarraf, Saket [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Anand, Shilpi [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Shukla, Yash [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  16. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on...

  17. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  18. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found...

  19. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  20. VISION, STRATEGY AND ACTION PLAN FOR SHELLFISH FARMING DEVELOPMENT IN THE KRKA RIVER ESTUARY

    Directory of Open Access Journals (Sweden)

    Drago Maguš

    2009-10-01

    Full Text Available In this paper are presented the vision, strategic guidelines/measures and the action plan for shellfish farming development in the Krka river estuary. They came as a result from several discussions that were held with shellfish farmers of the estuary area in year 2008 while writing the Integrated Plan for Shellfish Farming for Krka Estuary Area, which was realized in the framework of the Green Business Support Programme (UNDP COST Project — Conservation, and Sustainable Use of Biodiversity in the Dalmatian Coast through Greening Coastal Development. For a short–term, a considerable impetus for the development of shellfish farming in the Krka river estuary could be the construction of common distribution and purification center, building of warehouse for shellfish farming equipment, and providing work space for the preparation of the equipment as well as the space for waste disposal; for a long–term it could be building of shellfish hatchery at the location of Martinska marine station.

  1. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  2. A soil plan of action to awaken society beyond 2015

    Science.gov (United States)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  3. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  4. Alternatives/action plan report for outfall 17

    International Nuclear Information System (INIS)

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem

  5. Alternatives/action plan report for outfall 17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  6. Climatic Action Plan Project for the state of Veracruz (Mexico)

    Science.gov (United States)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  7. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  8. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  9. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  10. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  11. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    Science.gov (United States)

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  12. Succession planning: a call to action for nurse executives.

    Science.gov (United States)

    Trepanier, Sylvain; Crenshaw, Jeannette T

    2013-10-01

    To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.

  13. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  14. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  15. Motor planning is facilitated by adopting an action's goal posture: An fMRI study

    NARCIS (Netherlands)

    Zimmermann, M.; Meulenbroek, R.G.J.; Lange, F.P. de

    2012-01-01

    Abstract: Motor planning is a hierarchical process that is typically organized around an action's goal (e.g., drinking from a cup). However, the motor plan depends not only on the goal but also on the current body state. Here, we investigated how one's own body posture interacts with planning of

  16. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  17. RA reactor action plan for 1977 - Annex VI; Prilog VI - Plan rada reaktora RA za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-12-15

    In the RA reactor action plan for 1977 it is foreseen that the reactor would be operated for 181 days, mostly at nominal power of 6.5 MW. It is planned to produce 28236 MWh in total. Five reactor core exchanges (refuelling) are planned. The plan includes time for repair of components as well as for cooling. [Serbo-Croat] Plan rada reaktora RA predvidja rad tokom 181 dana, vecim delom na nominalnoj snazi od 6,5 MW tokom 1977. godine. Planirano je da ukupni rad iznosi 28236 MWh. Planom je predvidjeno i pet izmena goriva kao i vreme potrebno za remont opreme i hladjenje.

  18. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  19. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    T. M. Fitzmaurice

    2000-01-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection[NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site

  20. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2010-01-01

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  1. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  2. Planning, preparation, execution, and imagery of volitional action.

    Science.gov (United States)

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc.

  3. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  4. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-04-15

    ... Blocking Agent in Radiation Emergencies, FDA (66 FR 64046, Dec. 11, 2001). Provide basic planning guidance... decision making. Chapter 4--Late Phase: A brief planning guidance on the cleanup process is included... PAG Manual. Basic planning guidance on approaching radioactive waste disposal is included. Please...

  5. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  6. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  7. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States)

    2017-08-01

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

  9. Evaluating Courses of Actions at the Strategic Planning Level

    Science.gov (United States)

    2013-03-01

    Normann and Ramirez 1993). • American business historian, Alfred D. Chandler in 1962, defines strategy as “the determination of the basic long...goals” ( Chandler 1962). The planning makes us prepare a better future. It helps to formulate methods or means to achieve a desired objective or goal in...Jossey-Bass, 1995. Chandler , A.D. Strategy and Structure. Cambridge, MA: MIT Press, 1962. Evered, Roger. "So What is Strategy?" Long Range Planning 16

  10. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Grant Evenson

    2006-01-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139

  11. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  12. Implementation of a safety action plan: reduction of the dose limits in a research centre

    International Nuclear Information System (INIS)

    Deworm, J.P.

    1992-01-01

    The Belgian Regulations require an annual Action Plan to improve the Safety and health conditions of works. Taking into consideration the preliminary versions of the new ICRP-recommendations, the 1990 Action Plan of the Belgian research Centre aimed to reduce the personal dose limit to 20 mSv/year and the annual collective dose by 10%. Major means used in the campaign were sensibility through information, consultation between hierarchy and executors and the application of a policy of discouragement at certain limits. As a result, the maximum level reaches was 16.5 mSv, while only 7 people received a dose above 10 mSv (of 219 who received a measurable dose, mean value 3,4 mSv). This success is due to the commitment at all levels of responsibilities. In 1991, the 20 mSv-limit is imposed as an obligation by the management, and a feasibility study to impose 10 mSv in near future is being undertaken. (author)

  13. Rehabilitation in Madagascar: Challenges in implementing the World Health Organization Disability Action Plan.

    Science.gov (United States)

    Khan, Fary; Amatya, Bhasker; Mannan, Hasheem; Burkle, Frederick M; Galea, Mary P

    2015-09-01

    To provide an update on rehabilitation in Madagascar by using local knowledge to outline the potential barriers and facilitators for implementation of the World Health Organization (WHO) Disability Action Plan (DAP). A 14-day extensive workshop programme (September-October 2014) was held at the University Hospital Antananarivo and Antsirabe, with the Department of Health Madagascar, by rehabilitation staff from Royal Melbourne Hospital, Australia. Attendees were rehabilitation professionals (n=29) from 3 main rehabilitation facilities in Madagascar, who identified various challenges faced in service provision, education and attitudes/approaches to people with disabilities. Their responses and suggested barriers/facilitators were recorded following consensus agreement, using objectives listed in the DAP. The barriers and facilitators outlined by participants in implementing the DAP objectives include: engagement of health professionals and institutions using a multi-sectoral approach, new partnerships, strategic collaboration, provision of technical assistance, future policy directions, and research and development. Other challenges for many basic policies included: access to rehabilitation services, geographical coverage, shortage of skilled work-force, limited info-technology systems; lack of care-models and facility/staff accreditation standards; limited health services infrastructure and "disconnect" between acute and community-based rehabilitation. The DAP summary actions were useful planning tools to improve access, strengthen rehabilitation services and community-based rehabilitation, and collate data for outcome research.

  14. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    David Strand

    2006-06-01

    contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval.

  15. Student Centric Learning Through Planned Hard work - An Innovative Model

    OpenAIRE

    Aithal, Sreeramana; Aithal, Shubrajyotsna

    2016-01-01

    The strategies followed by educational institutions and the students become very important when the performance of students in the examinations is concerned. By means of properly planned and well guided model of training and motivation to do hard work, students can follow a well disciplined study plan and become exceptionally successful in examinations. Teaching and training by experienced and dedicated faculty members, continuous support by parents and motivating the students based on settin...

  16. Training Effectiveness Assessment of Red Cape: Crisis Action Planning and Execution

    National Research Council Canada - National Science Library

    Schaefer, Peter S; Shadrick, Scott B; Beaubien, Jeff; Crabb, Brian T

    2008-01-01

    The crisis response training program Red Cape: Crisis Action Planning and Execution uses theme-based training and multimedia scenarios to instill expert thinking patterns in crisis response personnel...

  17. Initial Remedial Action Plan for Expanded Bioventing System BX Service Station, Patrick Air Force Base, Florida

    National Research Council Canada - National Science Library

    1995-01-01

    This initial remedial action plan presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the BX Service Station at Patrick Air Force Base (AFB), Florida...

  18. Remedial Action Plan for Expanded Bioventing System Buildings 2034/2035, Fairchild Air Force Base, Washington

    National Research Council Canada - National Science Library

    1996-01-01

    This remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils in the vicinity of Buildings 2034 and 2035 at Fairchild Air Force Base (AFB), Washington...

  19. NRC action plan developed as a result of the TMI-2 accident. Volume 2

    International Nuclear Information System (INIS)

    1980-05-01

    The Action Plan provides a comprehensive and integrated plan for all actions judged necessary by the Nuclear Regulatory Commission to correct or improve the regulation and operation of nuclear facilities based on the experience from the accident at the Three Mile Island, Unit 2, nuclear facility and the official studies and investigations of the accident. The tables included in this volume list the recommendations from the various organizations and task forces investigating the accident at Three Mile Island. The tables are annotated to provide easy references to the associated parts of the Action Plan in Volume 1. The tables are also annotated to provide a shorthand indication of how the various recommendations are treated in the Action Plan

  20. National action plan 2016-2019 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Mortureux, Marc; Vallet, Benoit; Struillou, Yves; Girometti, Laurent

    2017-01-01

    After a brief presentation of the context, and a presentation of aspects related to the plan governance and strategies (plan steering, actors in the radon risk management, synthesis of main actions in France, regulatory evolutions and new strategies), this report presents the three axes of the national action plan for 2016-2019. The first one consists in the implementation of a global strategy of information and in developing tools to collect and share information. The second one consists in a continuous knowledge improvement. The third one consists in a better taking into account of radon risk management in buildings. Sheets are then proposed which describe the various actions associated with these axes (5 actions for the first one, 10 for the second, and 5 for the third one). Each sheet comprises the action title, its objectives, methods and tools, its coordinator and actors, its agenda and current status

  1. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  2. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential

  3. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  4. Who formulates self-regulatory action plans regarding fruit consumption? An application of the big five personality theory.

    NARCIS (Netherlands)

    de Bruijn, G.-J.

    2013-01-01

    Objective: Action planning is regarded as an important correlate and predictor of health behaviour, but little is known about antecedents of action planning. Because personality constructs have been shown to moderate the effect of action planning interventions, the present study tested associations

  5. The Second Physical Therapy Summit on Global Health: developing an action plan to promote health in daily practice and reduce the burden of non-communicable diseases

    DEFF Research Database (Denmark)

    Meyer, Erna Rosenlund; Dean,, Elizabeth

    2013-01-01

    . Working questions were: (1) how well is health promotion implemented within physical therapy practice; and (2) how might this be improved across five target audiences (i.e. physical therapist practitioners, educators, researchers, professional body representatives, and government liaisons......-focused physical therapy as a clinical competency across regions and within target audiences. Participants agreed that healthfocused practice is a professional priority, and a strategic action plan was needed to develop it as a clinical competency. The action plan and recommendations largely paralleled...

  6. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    ITLV

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation

  7. Measuring the quality of Patients’ goals and action plans: development and validation of a novel tool

    Directory of Open Access Journals (Sweden)

    Teal Cayla R

    2012-12-01

    Full Text Available Abstract Background The purpose of this study is to develop and test reliability, validity, and utility of the Goal-Setting Evaluation Tool for Diabetes (GET-D. The effectiveness of diabetes self-management is predicated on goal-setting and action planning strategies. Evaluation of self-management interventions is hampered by the absence of tools to assess quality of goals and action plans. To address this gap, we developed the GET-D, a criteria-based, observer rating scale that measures the quality of patients’ diabetes goals and action plans. Methods We conducted 3-stage development of GET-D, including identification of criteria for observer ratings of goals and action plans, rater training and pilot testing; and then performed psychometric testing of the GET-D. Results Trained raters could effectively rate the quality of patient-generated goals and action plans using the GET-D. Ratings performed by trained evaluators demonstrated good raw agreement (94.4% and inter-rater reliability (Kappa = 0.66. Scores on the GET-D correlated well with measures theoretically associated with goal-setting, including patient activation (r=.252, P Conclusions The GET-D can reliably and validly rate the quality of goals and action plans. It holds promise as a measure of intervention fidelity for clinical interventions that promote diabetes self-management behaviors to improve clinical outcomes. Trial registration Clinicaltrials.gov Identifier: NCT00481286

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  9. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  10. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  11. Action Plan on Base Erosion and Profit Shifting: An Indian Perspective.

    OpenAIRE

    Rao, R. Kavita; Sengupta, D.P.

    2014-01-01

    The discussion in this paper highlights some evidence to support the notion that there is base erosion in India. On the specific action points listed in the OECD's Action Plan, a perspective from India's stand point has been presented along with a brief discussion on the steps needed to prepare for complying with likely proposed measures.

  12. Pre-Planning Civic Action: An Analysis of Civic Leaders' Problem Solving Strategies

    Science.gov (United States)

    Fitzgerald, Jason

    2016-01-01

    This study explores the civic thinking heuristics that civic leaders use when pre-planning action. Across eight think-aloud protocols, findings suggest that three heuristics are employed. "Frame alignment" refers to the process of harmonizing personal beliefs and interests with the particulars of a civic action issue to find personal…

  13. The impact of participation in strategic planning and action planning on management control effectiveness: An analysis of independent and joint effects

    OpenAIRE

    Bedford, David S.; Bednark, Piotr; Dossi, Andrea; Ditillo, Angelo; Gosselin, Maurice; Madsen, Dag Øivind

    2016-01-01

    This research paper examines the independent and joint effects of participation in strategic planning and action planning. There is extensive research about employee participation in both the fields of strategic planning and budgeting. However, there is a lack of research about the interaction between participation in strategic planning and budgeting. Drawing on the research on participation in decision-making processes, the hypothesis is that strategic planning and action plan...

  14. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-05-16

    ... Disease Control and Prevention, National Center for Chronic Disease Prevention and Health Promotion... Promotion, Division of Reproductive Health, 4770 Buford Highway NE., Mailstop K-34, Atlanta, Georgia 30341... health importance, existing challenges, and opportunities for action to decrease the impact of...

  15. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    OpenAIRE

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian; Togelius, Julian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions ...

  16. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  17. Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage

    International Nuclear Information System (INIS)

    Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho

    2005-01-01

    Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work

  18. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2006-01-01

    Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: (sm b ullet) CAS 06-07-01, Decon Pad (sm b ullet) CAS 15-01-03, Aboveground Storage Tank (sm b ullet) CAS 15-04-01, Septic Tank (sm b ullet) CAS 15-05-01, Leachfield (sm b ullet) CAS 15-08-01, Liquid Manure Tank (sm b ullet) CAS 15-23-01, Underground Radioactive Material Area (sm b ullet) CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs

  19. Record of Technical Change No.2 for ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    International Nuclear Information System (INIS)

    1999-01-01

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  20. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  1. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting

  2. Implementation of an action plan in radiological protection of the patient in Argentina

    International Nuclear Information System (INIS)

    Michelin, S.; Perez, M.R.; Dubner, D.

    2006-01-01

    consider the inclusion of topics of PRP in the medical grade formation. Work groups were constituted in Radiodiagnostic, Radiotherapy, Nuclear Medicine and the PRP of the pregnant woman that agreed the contents and chronograph of a work plan to short and medium term that is at the moment in execution. The continuity of this coordinated action facilitated the execution of the proposed objectives. In this communication the results obtained until the present of the action plan for the PRP implemented in the Argentina starting from the year 2004 are presented. (Author)

  3. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  4. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  5. Visual information for action planning in left and right congenital hemiparesis

    NARCIS (Netherlands)

    Craje, C.; van der Kamp, J.; Steenbergen, B.

    2009-01-01

    Converging evidence suggests that compromised motor abilities in hemiparetic cerebral palsy are not solely due to impairments in motor execution, but are also related to deficits in action planning. The present study had two aims. First, we compared grip planning in a sequential task between

  6. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  7. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    Science.gov (United States)

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  8. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  9. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  10. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  11. Women's Economic Empowerment in Latin America and the Caribbean : Policy Lessons from the World Bank Gender Action Plan

    OpenAIRE

    World Bank

    2012-01-01

    Group s gender action plan (GAP) trust fund has financed a series of programs to promote gender equality by empowering women to compete in key markets: land, labor, agriculture, finance and the private sector. Work and family: Latin American and the Caribbean women in search of a new balance offer new analysis of how household decision-making and allocation of resources affects female labo...

  12. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  13. AREVA - 2012 annual results: significant turnaround in performance one year after launching the Action 2016 plan

    International Nuclear Information System (INIS)

    Duperray, Julien; Berezowskyj, Katherine; Kempkes, Vincent; Rosso, Jerome; Thebault, Alexandre; Scorbiac, Marie de; Repaire, Philippine du

    2013-01-01

    One year after launching Areva's Action 2016 strategic plan, the first results are in. AREVA is ahead of schedule in executing its recovery plan. While pursuing its efforts in the management of a few difficult projects (such as OL3), Areva group was able to return to a virtuous performance cycle rooted in strong growth in nuclear order intake and good progress on its cost reduction program. Commercially, despite the difficult economic environment, AREVA was able to capitalize on its leadership in the installed base and on its long-term partnerships with strategic customers, beginning with EDF, with which AREVA renewed a confident and constructive working relationship. Areva has secured 80% of its objective of one billion euros of savings by the end of 2015 to improve its competitiveness. The group also continued efforts to optimize working capital requirement and control the capital expenditure trajectory. Together, these results enabled AREVA to exceed the objectives set for 2012 for two key indicators of its strategic plan: EBITDA and free operating cash flow. Nearly 60% of the 2.1 billion euros devoted to capital expenditures for future growth in 2012 were funded by operations, a quasi-doubled share compared to 2011. Areva's floor target for asset disposals was achieved one year ahead of schedule, also helping the Group to control its net debt, which remained below 4 billion euros. In 2013, Areva is continuing to implement the Action 2016 plan to keep its turnaround on track. In summary: - Backlog renewed over the year 2012 to euro 45.4 bn thanks to the increase in nuclear order intake; - Sales revenue growth: euro 9.342 bn (+5.3% vs. 2011), led by nuclear and renewables operations; - Very sharp upturn in EBITDA: euro 1.007 bn (+euro 586 m vs. 2011) - Very net improvement in free operating cash flow: -euro 854 m (+euro 512 m vs. 2011); - Back to positive reported operating income: euro 118 m (+euro 1.984 bn vs. 2011); - 2012-2013 floor target for asset disposals

  14. Setting priorities for action plans at Los Alamos National Laboratory. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, A.C.

    1992-09-30

    This report summarizes work done by Applied Decision Analysis (ADA) for Los Alamos National Laboratory (LANL) under Subcontract Number 9-XQ2-Y3837-1 with the University of California. The purpose of this work was to develop a method of setting priorities for environmental, safety, and health (ES&H) deficiencies at Los Alamos. The deficiencies were identified by a DOE Tiger Team that visited LANL in the fall of 1991, and by self assessments done by the Laboratory. ADA did the work described here between October 1991 and the end of September 1992. The ADA staff working on this project became part of a Risk Management Team in the Laboratory`s Integration and Coordination Office (ICO). During the project, the Risk Management Team produced a variety of documents describing aspects of the action-plan prioritization system. Some of those documents are attached to this report. Rather than attempt to duplicate their contents, this report provides a guide to those documents, and references them whenever appropriate.

  15. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  16. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  17. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  18. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  19. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  20. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  1. N Springs expedited response action performance monitoring plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    Groundwater contained in the 100-NR-2 Operable Unit is contaminated with various radionuclides derived from waste water disposal practices and spills associated with 100-N Reactor operations. Of primary concern is the presence of high levels of 90 Sr in the groundwater and the discharge of 90 Sr-contaminated groundwater to the nearby Columbia River through historic river bank seeps known as ''N Springs.'' A pump-and-treat system is being installed to remove 90 Sr contamination from the groundwater as part of the N Springs expedited response action (ERA). The groundwater extraction system will consist of four extraction and two injection wells with a proposed initial treatment capacity of 50 gal/min. The proposed location of the groundwater extraction system relative to the 90 Sr groundwater plume is presented

  2. School Climate Improvement Action Guide for Working with Students. School Climate Improvement Resource Package

    Science.gov (United States)

    National Center on Safe Supportive Learning Environments, 2017

    2017-01-01

    Improving school climate takes time and commitment from a variety of people in a variety of roles. This document outlines key action steps to engage students in the school climate improvement process. Key action steps are provided for the following strategies: (1) Participate in planning for school climate improvements; (2) Engage stakeholders in…

  3. Corrective action investigation plan for the Roller Coaster RADSAFE Area, Corrective Action Unit 407, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. CAUs consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 407, the Roller Coaster RADSAFE Area (RCRSA) which is located on the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 km (140 mi) northwest of Las Vegas, Nevada. CAU No. 407 is comprised of only one CAS (TA-23-001-TARC). The RCRSA was used during May and June 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site. The purpose of the corrective action investigation described in this CAIP is to: identify the presence and nature of COPCs; determine the vertical and lateral extent of COPCs; and provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS

  4. Corrective action investigation plan for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 342, the Area 23 Mercury Fire Training Pit (FTP), which is located in Area 23 at the Nevada Test Site (NTS). The NTS is approximately 88 km (55 mi) northwest of Las Vegas, Nevada. Corrective Action Unit 342 is comprised of CAS 23-56-01. The FTP is an area approximately 100 m by 140 m (350 ft by 450 ft) located west of the town of Mercury, Nevada, which was used between approximately 1965 and 1990 to train fire-fighting personnel (REECo, 1991; Jacobson, 1991). The surface and subsurface soils in the FTP have likely been impacted by hydrocarbons and other contaminants of potential concern (COPC) associated with burn activities and training exercises in the area.

  5. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  6. Differential beta-band event-related desynchronization during categorical action sequence planning.

    Directory of Open Access Journals (Sweden)

    Hame Park

    Full Text Available A primate study reported the existence of neurons from the dorso-lateral prefrontal cortex which fired prior to executing categorical action sequences. The authors suggested these activities may represent abstract level information. Here, we aimed to find the neurophysiological representation of planning categorical action sequences at the population level in healthy humans. Previous human studies have shown beta-band event-related desynchronization (ERD during action planning in humans. Some of these studies showed different levels of ERD according to different types of action preparation. Especially, the literature suggests that variations in cognitive factors rather than physical factors (force, direction, etc modulate the level of beta-ERD. We hypothesized that the level of beta-band power will differ according to planning of different categorical sequences. We measured magnetoencephalography (MEG from 22 subjects performing 11 four-sequence actions--each consisting of one or two of three simple actions--in 3 categories; 'Paired (ooxx', 'Alternative (oxox' and 'Repetitive (oooo' ('o' and 'x' each denoting one of three simple actions. Time-frequency representations were calculated for each category during the planning period, and the corresponding beta-power time-courses were compared. We found beta-ERD during the planning period for all subjects, mostly in the contralateral fronto-parietal areas shortly after visual cue onset. Power increase (transient rebound followed ERD in 20 out of 22 subjects. Amplitudes differed among categories in 20 subjects for both ERD and transient rebound. In 18 out of 20 subjects 'Repetitive' category showed the largest ERD and rebound. The current result suggests that beta-ERD in the contralateral frontal/motor/parietal areas during planning is differentiated by the category of action sequences.

  7. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  8. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  9. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-05-01

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and

  10. Renewable energy plan of action for American Samoa

    Energy Technology Data Exchange (ETDEWEB)

    Shupe, J.W. (USDOE San Francisco Operations Office, Honolulu, HI (USA). Pacific Site Office); Stevens, J.W. (Sandia National Labs., Albuquerque, NM (USA))

    1990-11-01

    American Samoa has no indigenous fossil fuels and is almost totally dependent for energy on seaborne petroleum. However, the seven Pacific Islands located at 14 degrees south latitude that constitute American Samoa have a wide variety of renewable resources with the potential for substituting for imported oil. Included as possible renewable energy conversion technologies are solar thermal, photovoltaics, wind, geothermal, ocean thermal, and waste-to-energy recovery. This report evaluates the potential of each of these renewable energy alternatives and establishes recommended priorities for their development in American Samoa. Rough cost estimates are also included. Although renewable energy planning is highly site specific, information in this report should find some general application to other tropical insular areas.

  11. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  12. Testing principle working mechanisms of the health action process approach for subjective physical age groups.

    Science.gov (United States)

    Wienert, Julian; Kuhlmann, Tim; Fink, Sebastian; Hambrecht, Rainer; Lippke, Sonia

    2016-01-01

    This study investigated differences in social-cognitive predictors and self-regulatory planning, as proposed by the health action process approach (HAPA), across three different subjective physical age groups for physical activity. With a cross-sectional design, 521 participants across the chronological age span from 25 to 86 years (M = 48.79; SD = 12.66) were separated into three groups: those who feel physically younger than they are in terms of chronological age, the same perceived and chronological age, and feeling physically older compared to their chronological age. Participants were assessed regarding their perceived vulnerability, outcome expectancies, general intentions, planning, self-efficacy, and stages of physical activity (non-intenders, intenders, and actors). Data were analysed via mean comparison and multigroup structural equation modelling. Mean differences for all but one construct were eminent in all groups, generally showing that those feeling physically younger also report better social-cognitive predictors of physical activity (e.g. lower perceived vulnerability) in comparison to those who feel the same age or older. The model showed that basic working mechanisms of the HAPA can be applied to all groups. With that, the results provide for the first time evidence that principle working mechanism of the HAPA can be applied to all subjective physical age groups. These may be used to tailor health promoting interventions according to participants' needs as a more suitable proxy than chronological age.

  13. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  14. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  15. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  16. RA reactor Action plan for 1978 - Annex VI; Prilog VI - Plan rada reaktora RA za 1978. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-12-15

    This annex include a detailed monthly action plan of the RA reactor for 1978. It was planned that the reactor will operate at nominal and lower power levels for 158 days. The plan is made with the aim to achieve same annual neutron flux as in 1977, which is somewhat higher then the annual production in the period from 1968-1975. [Serbo-Croat] Ovaj prilog sadrzi detaljan plan rada reaktora RA za 1978. godinu. Planirano je da reaktor radi na nominalnoj snazi of 6,5 MW i na manjim snagama ukupno 158 dana. Plan je napravljen tako da se ostvari godisnja proizvodnja neutronskog fluksa u obimu koji je relaizovan 1977. godine sto je nesto vise od godisnje proizvodnje u periodu 1968-1975.

  17. Developing a vision and strategic action plan for future community-based residency training.

    Science.gov (United States)

    Skelton, Jann B; Owen, James A

    2016-01-01

    The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to

  18. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  19. CONSTRUCTING ORGANIZATIONAL DISCOURSE. A SYMBOLIC ACTION IN IMPROVING WORK

    Directory of Open Access Journals (Sweden)

    Alexandra GALBIN

    2015-04-01

    Full Text Available Social constructionism, a postmodern approach with epistemological assumptions, brings new resources for organizational interventions. A key element in organizational development, the discourse plays an important role in fashioning the future of this. This article presents the organizational discourse as a symbolic action in which discourse influence behavior of members and reinforces mindsets. Discourse shapes the relations between individuals, and creates mental frames. Create change by changing the discourse generates fresh new possibilities and innovative forms to look at a situation. Constructing a positive organizational discourse offers a great potential for social change and address challenges and advances thinking in the organizational field.

  20. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973 to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.

  1. Model Action Plan for Nuclear Forensics and Nuclear Attribution

    International Nuclear Information System (INIS)

    Dudder, G B; Niemeyer, S; Smith, D K; Kristo, M J

    2004-01-01

    Nuclear forensics and nuclear attribution have become increasingly important tools in the fight against illegal trafficking in nuclear and radiological materials. This technical report documents the field of nuclear forensics and nuclear attribution in a comprehensive manner, summarizing tools and procedures that have heretofore been described independently in the scientific literature. This report also provides national policy-makers, decision-makers, and technical managers with guidance for responding to incidents involving the interdiction of nuclear and radiological materials. However, due to the significant capital costs of the equipment and the specialized expertise of the personnel, work in the field of nuclear forensics has been restricted so far to a handful of national and international laboratories. In fact, there are a limited number of specialists who have experience working with interdicted nuclear materials and affiliated evidence. Most of the laboratories that have the requisite equipment, personnel, and experience to perform nuclear forensic analysis are participants in the Nuclear Smuggling International Technical Working Group or ITWG (see Section 1.8). Consequently, there is a need to disseminate information on an appropriate response to incidents of nuclear smuggling, including a comprehensive approach to gathering evidence that meets appropriate legal standards and to developing insights into the source and routes of nuclear and radiological contraband. Appendix A presents a ''Menu of Options'' for other Member States to request assistance from the ITWG Nuclear Forensics Laboratories (INFL) on nuclear forensic cases

  2. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2003-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motor Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document

  3. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  4. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  5. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  6. Action plan in response to March 1981 report to NFPQT Committee

    International Nuclear Information System (INIS)

    1981-03-01

    This plan of action has been prepared at the direction of the Acting Under Secretary in response to the report of the Nuclear Facilities Personnel Qualifications and Training (NFPQT) Committee on A Safety Assessment of Department of Energy Nuclear Reactors. Senior Department officials with Headquarters responsibilities for the safety of nuclear facilities owned by and operated for the Department have developed this plan with input from the operations office managers having operational responsibility for such facilities. A summary of the plan's objectives and a cross-reference to the findings of the NFPQT Committee Report is attached to the plan. Appendix A contains implementing actions and Appendix B contains a summary of actions responsive to lessons learned from the TMI accident that have been completed or are well underway. Although the plan is written in definitive language, the specific actions (such as organization realignments and proposals) will be subject to appropriate review and approval. Also, other adjustments may be required as the actions are implemented

  7. [Security of hospital infusion practices: From an a priori risk analysis to an improvement action plan].

    Science.gov (United States)

    Pignard, J; Cosserant, S; Traore, O; Souweine, B; Sautou, V

    2016-03-01

    Infusion in care units, and all the more in intensive care units, is a complex process which can be the source of many risks for the patient. Under cover of an institutional approach for the improvement of the quality and safety of patient healthcare, a risk mapping infusion practices was performed. The analysis was focused on intravenous infusion situations in adults, the a priori risk assessment methodology was applied and a multidisciplinary work group established. Forty-three risks were identified for the infusion process (prescription, preparation and administration). The risks' assessment and the existing means of control showed that 48% of them would have a highly critical patient security impact. Recommendations were developed for 20 risks considered to be most critical, to limit their occurrence and severity, and improve their control level. An institutional action plan was developed and validated in the Drug and Sterile Medical Devices Commission. This mapping allowed the realization of an exhaustive inventory of potential risks associated with the infusion. At the end of this work, multidisciplinary groups were set up to work on different themes and regular quarterly meetings were established to follow the progress of various projects. Risk mapping will be performed in pediatric and oncology unit where the risks associated with the handling of toxic products is omnipresent. Copyright © 2015 Académie Nationale de Pharmacie. Published by Elsevier Masson SAS. All rights reserved.

  8. Nurse managers' strategies for feeling less drained by their work: an action research and reflection project for developing emotional intelligence.

    Science.gov (United States)

    Taylor, Bev; Roberts, Sue; Smyth, Therese; Tulloch, Moira

    2015-10-01

    To raise nurse managers' critical awareness of practice problems; uncover practice constraints and improve work effectiveness. Nurse management requires skills and knowledge, underscored by emotional intelligence. The research improved participants' practice and personal insights. Purposive sampling targeted nurse managers interested in improving their practice. Three experienced female nurse managers met fortnightly in a group, for 1 hour, for 10 meetings. The methods included: writing and sharing de-identified journal reflections; critically analysing practice stories; identifying a thematic concern; generating action strategies; and instituting and revising the action plan. Phase One resulted in the identification of the issue of 'being drained by the intensity of nurse managers' work'. The participants adopted five strategies: debriefing problematic situations; deflecting multiple requests; diffusing issues; naming dysfunctional behaviours; and regrouping. In Phase Two, participants implemented and revised the action plan strategies, which resulted in them feeling less drained by their work. Strategies can lessen nurse managers' sense of personal depletion. However, strategies cannot guarantee success every time because the emotional intelligence is integral to nurse management. Action research and reflection assist nurse managers to improve their practice and develop their emotional intelligence. © 2014 John Wiley & Sons Ltd.

  9. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  10. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  11. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  12. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  13. Do children perceive postural constraints when estimating reach or action planning?

    Science.gov (United States)

    Gabbard, Carl; Cordova, Alberto; Lee, Sunghan

    2009-03-01

    Estimation of whether an object is reachable from a specific body position constitutes an important aspect in effective motor planning. Researchers who estimate reachability by way of motor imagery with adults consistently report the tendency to overestimate, with some evidence of a postural effect (postural stability hypothesis). This idea suggests that perceived reaching limits depend on an individual's perceived postural constraints. Based on previous work with adults, the authors expected a significant postural effect with the Reach 2 condition, as evidenced by reduced overestimation. Furthermore, the authors hypothesized that the postural effect would be greater in younger children. They then tested these propositions among children aged 7, 9, and 11 years by asking them to estimate reach while seated (Reach 1) and in the more demanding posture of standing on 1 foot and leaning forward (Reach 2). Results indicated no age or condition difference, therefore providing no support for a postural effect. When the authors compared these data to a published report of adults, a developmental difference emerged. That is, adults recognize the perceived postural constraint of the standing position resulting in under- rather than overestimation, as displayed in the seated condition. Although preliminary, these observations suggest that estimates of reach (action planning) continue to be refined between late childhood and young adulthood.

  14. Transierra social action plan; Plano de acao social de Transierra: responsabilidade social e satisfacao comunitaria

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Alba, Rafael [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The design and the execution of the social - environmental compensation's plan of Transierra, or Plan of Social Action (PAS), are based on the implementation of programs and projects with 8 organizations belonging to 2 Indigenous Villages and with 6 Municipal Governments, for which jurisdictions crosses the Gas pipeline Yacuiba Rio Grande (GASYRG). The PAS is allowing the company to support tight links of good vicinity, and at the same time that is generating local employment and public and private concurrent investments, contributing this way to the sustainable development and to the improvement of the quality of life of the region and the country. Transierra's PAS is implemented by the principal social actors of the influence area who have institutional, legal and social - politics responsibilities with the development of more than 30.000 families, the same ones that have expressed a high degree of satisfaction for being beneficiaries of more than 600 projects of health, education, culture, basic sanitation, infrastructure and productive development. The present work tries to summarize the current advances and the results of the implementation of the PAS, as well as to demonstrate that the levels of satisfaction of the beneficiaries are happily coincidental with the institutional intentions of Social Corporate Responsibility. (author)

  15. Transierra social action plan; Plano de acao social de Transierra: responsabilidade social e satisfacao comunitaria

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Alba, Rafael [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The design and the execution of the social - environmental compensation's plan of Transierra, or Plan of Social Action (PAS), are based on the implementation of programs and projects with 8 organizations belonging to 2 Indigenous Villages and with 6 Municipal Governments, for which jurisdictions crosses the Gas pipeline Yacuiba Rio Grande (GASYRG). The PAS is allowing the company to support tight links of good vicinity, and at the same time that is generating local employment and public and private concurrent investments, contributing this way to the sustainable development and to the improvement of the quality of life of the region and the country. Transierra's PAS is implemented by the principal social actors of the influence area who have institutional, legal and social - politics responsibilities with the development of more than 30.000 families, the same ones that have expressed a high degree of satisfaction for being beneficiaries of more than 600 projects of health, education, culture, basic sanitation, infrastructure and productive development. The present work tries to summarize the current advances and the results of the implementation of the PAS, as well as to demonstrate that the levels of satisfaction of the beneficiaries are happily coincidental with the institutional intentions of Social Corporate Responsibility. (author)

  16. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  17. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  18. LEAP: local environmental action plan. Municipality of Dolneni

    International Nuclear Information System (INIS)

    2004-01-01

    The Municipality of Dolneni is situated in the northern part of the Pelagonia Valley, at about 600 meters above the sea level. It is surrounded on three sides (north, northeast, east and northwest) by the mountain massifs of Dautica, Babuna and Busova Planina. The assesment of the state of the environment in the Municipality of Dolneni presented in this document is based on several principles, including, before all, human health, as well as impacts from human activities on urban and natural environment, social and economic development, etc. The impacts from environmental pollution on human health in the Municipality of Dolneni are evident. Major problem is the lack of sewerage system to collect wastewater and absence of organized landfill(s) for solid waste disposal. In addition, the improper drinking water supply in most of the settlements contributes to the increased human health risk in the Municipality. The absence of urban planning has lead to developments and uncontrolled use of natural resources that cause degradation of the environment and consequently decrease in quality of living for the population. The above problems affect the quality of living conditions and human health both directly and indirectly. In recent years, incidence of epidemics of communicable hepatitis was recovered (Debreste, Desovo), and there is a concern for a high risk of appearance of intestinal and other infectious diseases. There are no indicators of the soil quality of surface running water resources with regard to pollution. In any case, on the basis of the manner of land use and specific human activities on the territory of the Municipality, as well as on the basis of the above mentioned solid waste and waste water related problems, it may be concluded that these resources are in a rather poor condition. Other aspects of determining the quality of the environment (atmosphere, noise, natural ecosystems and biodiversity in general) are not under serious human pressure at present

  19. Action Planning and the Timescale of Evidence Accumulation.

    Directory of Open Access Journals (Sweden)

    Konstantinos Tsetsos

    Full Text Available Perceptual decisions are based on the temporal integration of sensory evidence for different states of the outside world. The timescale of this integration process varies widely across behavioral contexts and individuals, and it is diagnostic for the underlying neural mechanisms. In many situations, the decision-maker knows the required mapping between perceptual evidence and motor response (henceforth termed "sensory-motor contingency" before decision formation. Here, the integrated evidence can be directly translated into a motor plan and, indeed, neural signatures of the integration process are evident as build-up activity in premotor brain regions. In other situations, however, the sensory-motor contingencies are unknown at the time of decision formation. We used behavioral psychophysics and computational modeling to test if knowledge about sensory-motor contingencies affects the timescale of perceptual evidence integration. We asked human observers to perform the same motion discrimination task, with or without trial-to-trial variations of the mapping between perceptual choice and motor response. When the mapping varied, it was either instructed before or after the stimulus presentation. We quantified the timescale of evidence integration under these different sensory-motor mapping conditions by means of two approaches. First, we analyzed subjects' discrimination threshold as a function of stimulus duration. Second, we fitted a dynamical decision-making model to subjects' choice behavior. The results from both approaches indicated that observers (i integrated motion information for several hundred ms, (ii used a shorter than optimal integration timescale, and (iii used the same integration timescale under all sensory-motor mappings. We conclude that the mechanisms limiting the timescale of perceptual decisions are largely independent from long-term learning (under fixed mapping or rapid acquisition (under variable mapping of sensory

  20. Clean air plans and action plans: perspectives from the viewpoint of environmental and public health; Luftreinhalteplaene und Aktionsplaene - eine Bewertung aus umweltmedizinischer Sicht

    Energy Technology Data Exchange (ETDEWEB)

    Eikmann, T.; Herr, C. [Inst. fuer Hygiene und Umweltmedizin, Universitaetsklinikum Giessen und Marburg, Justus-Liebig-Univ. Giessen, Giessen (Germany); [Technische Univ. Dreden, Pirna (Germany). Inst. fuer Abfallwirtschaft und Altlasten; Koeckler, H. [Center for Environmental Systems Research (CESR), Univ. Kassel (Germany); [Mentec GmbH, Aue/Sa. (Germany); Nieden, A. zur [Inst. fuer Hygiene und Umweltmedizin, Universitaetsklinikum Giessen und Marburg, Justus-Liebig-Univ. Giessen, Giessen (Germany); FG Stadtklimatologie, Univ. Kassel (Germany); Katzschner, L. [FG Stadtklimatologie, Univ. Kassel (Germany); [INTECUS Dresden GmbH (Germany); Schimmelpfennig, M. [Gesundheitsamt der Stadt Kassel (Germany); Eikmann, S. [GUK - Gesellschaft fuer Umwelttoxikologie und Krankenhaushygiene mbH, Wetzlar (Germany)

    2005-07-01

    The present discussion on the health effects associated with airborne fine particulate matter has lead to an increased public interest in the general framework of compilation and evaluation of clean air plans and actions plans. While the surveys of the ''old'' clean air plans of the 80ies and 90ies of the last century relied on assessment of direct and indirect effects of air pollution on human health (and ecology), theses surveys are not part of the ''new'' clean air plans according to European law. This reduction of surveys and actions directed at threshold compliance only, abandons assessing, i.e., documentation and evaluation the health status and quality of life of populations. Assessment of individual and focus group specific sensibility and vulnerability becomes possible once health related, sociodemographic and environmental data are combined. By this, unequal life chance, i.e., unimpaired health as well as reasonable strategies towards minimizing environmental injustice can be identified. As of yet it is unclear, to what extend quality of life and quality of environment of populations living in air polluted areas are attributable to socioeconomic factors. Likewise, it is not known to which degree the environmental quality of individuals and families is self determined. This has to be considered especially for children, immigrants and women. These issues i.e., environmental justice/injustice should be considered in future projects on the development of clean air plans and especially actions plans derived thereof. Scientists, government officials and physicians working in field of preventive or environmental medicine cannot agree to a limitation of the cautionary principle to the bare compliance with thresholds. (orig.)

  1. Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. S. Tobiason

    2000-08-01

    Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the

  2. Challenging behaviour: an action plan for education and training.

    Science.gov (United States)

    Farrell, Gerald A; Salmon, Peter

    Nurses and other health care staff frequently encounter a range of aggressive and other 'challenging behaviours' at work from clients and colleagues. In response to staff concerns, an abundance of state and national policies are now available but it is left up to individual employers to decide how best to implement them at a local level. In this paper we offer an education and training model which is conceptually sound, practical in application, and suitable for health care staff at different levels in the organisation. The importance of understanding challenging behaviour from an interactional perspective, and the educational principles on which training should be founded, are discussed. Finally, the cost of training and the need for program evaluation are considered.

  3. The search conference as a method in planning community health promotion actions

    Directory of Open Access Journals (Sweden)

    Eva Magnus

    2016-08-01

    Full Text Available Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives.

  4. Physical Activity Participation: Social Cognitive Theory versus the Theories of Reasoned Action and Planned Behavior.

    Science.gov (United States)

    Dzewaltowski, David A; Noble, John M; Shaw, Jeff M

    1990-12-01

    Social cognitive theory and the theories of reasoned action and planned behavior were examined in the prediction of 4 weeks of physical activity participation. The theories of reasoned action and planned behavior were supported. Attitude and perceived control predicted intention, and intention predicted physical activity participation. The social cognitive theory variables significantly predicted physical activity participation, with self-efficacy and self-evaluation of the behavior significantly contributing to the prediction. The greater the confidence in participating in physical activity and the greater the satisfaction with present physical activity, the more physical activity performed. Hierarchical regression analyses indicated that perceived control and intentions did not account for any unique variation in physical activity participation over self-efficacy. Therefore the social cognitive theory constructs were better predictors of physical activity than those from the theories of reasoned action and planned behavior.

  5. HERCA Action Plan in relation to the transposition and implementation of Directive 2013/59/Euratom (Euratom BSS)

    International Nuclear Information System (INIS)

    Fremout, An; Vanderlinck, Annie; Berlamont, Jolien; Van Bladel, Lodewijk; Petrova, Karla; Ulbak, Kaare; Mundigl, Stefan; ); Markkanen, Mika; Godet, Jean-Luc; Tran-Thien, Vivien; Koch, Isabell Christin; Hackstein, Matthias; Griebel, Juergen; Kamenopoulou, Vasiliki; Fennel, Stephan; Ryan, Tom; Schreiner, Alexandra; Majerus, Patrick; Vermeulen, Ton; Holo, Eldri; Wiklund, Asa; RYF, Salome; Thomas, Gareth; Wellens, Rob; Ebdon-Jackson, Steve

    2014-10-01

    On 5 December 2013, the Council of the European Union adopted Council Directive 2013/59/Euratom laying down basic safety standards for protection against the dangers arising from exposure to ionising radiation.1 Member States have to transpose the new Basic Safety Standards Directive (BSS Directive) into their national legal systems by 6 February 2018 at the latest. At the 13. meeting of the Board of HERCA (BoH) in Vilnius in June 2014, a proposal to establish a special Task Force (TF) to make proposals in relation to HERCA activities in support of the transposition and implementation of the new Euratom BSS Directive was agreed. The BSS-TF was established, commenced its work on the basis of a 'non-questionnaire' and a discussion document. It met on one occasion on 7 October 2014 and agreed an action plan for consideration by the BoH. The agreed action plan proposal was approved by the BoH on the occasion of its 14. meeting in Stockholm, on 21-22 October 2014. The approved Action Plan covers the following areas: - Identification of HERCA's role in the transposition of the new Euratom BSS; - Definition of actions for HERCA in relation to the transposition of the BSS; - Coordination between HERCA and the EC in relation to BSS transposition activities. The Actions identified relate to several subject areas: Emergency preparedness and response; Medical exposures; Radon; Non-medical imaging exposures; RPE/RPO; General exchange of information. HERCA is a voluntary association, in which the Heads of European Radiological Protection Competent Authorities work together in order to identify common issues and propose practical solutions for these issues. It has no statutory role in relation to the transposition of the Euratom BSS. However, additional work by HERCA can support the transposition process as indicated in the Action Plan. Uniform transposition or implementation in the Member States is not an objective of HERCA activities. Clearly it will remain a matter for

  6. Corrective Action Investigation Plan for Corrective Action Unit 487: Thunderwell Site, Tonopah Test Range, Nevada (Rev. No.: 0, January 2001)

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-01-02

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 487, Thunderwell Site, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 487 consists of a single Corrective Action Site (CAS), RG 26-001-RGRV, Thunderwell Site. The site is located in the northwest portion of the TTR, Nevada, approximately five miles northwest of the Area 3 Control Point and closest to the Cactus Flats broad basin. Historically, Sandia National Laboratories in New Mexico used CAU 487 in the early to mid-1960s for a series of high explosive tests detonated at the bottom of large cylindrical steel tubes. Historical photographs indicate that debris from these tests and subsequent operations may have been scattered and buried throughout the site. A March 2000 walk-over survey and a July 2000 geophysical survey indicated evidence of buried and surface debris in dirt mounds and areas throughout the site; however, a radiological drive-over survey also performed in July 2000 indicated that no radiological hazards were identified at this site. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that detonation activities at this CAU site may have resulted in the release of contaminants of concern into the surface/subsurface soil including total volatile and total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, radionuclides, total petroleum hydrocarbons, and high explosives. Therefore, the scope of corrective action field investigation will involve excavation, drilling, and extensive soil sampling and analysis activities to determine the extent (if any) of both the lateral and vertical contamination

  7. Principles in Action: The Work of Henri Wallon

    Science.gov (United States)

    Voyat, Gilbert

    1974-01-01

    An examination of the life and philosophy of Henri Wallon, A French psychiatrist, psychologist, and educator, focusing on his views regarding the role of imitation in adaptation and learning, emotional development, syncretic thought, his differences with Piaget, and an assessment of the impact of his work. (EH)

  8. Rural Action: A Collection of Community Work Case Studies.

    Science.gov (United States)

    Henderson, Paul, Ed.; Francis, David, Ed.

    This book contains 10 case studies of rural community development in England, Wales, Scotland, Ireland, and Catalonia, as seen from the perspective of community-work practitioners. Development projects encompassed such activities as promotion of tourism, establishment of community centers, vocational training for school dropouts, adult community…

  9. Shift Work and Health: Current Problems and Preventive Actions

    Directory of Open Access Journals (Sweden)

    Giovanni Costa

    2010-12-01

    Full Text Available The paper gives an overview of the problems to be tackled nowadays by occupational health with regards to shift work as well as the main guidelines at organizational and medical levels on how to protect workers’ health and well-being. Working time organization is becoming a key factor on account of new technologies, market globalization, economic competition, and extension of social services to general populations, all of which involve more and more people in continuous assistance and control of work processes over the 24 hours in a day. The large increase of epidemiological and clinical studies on this issue document the severity of this risk factor on human health and well being, at both social and psychophysical levels, starting from a disruption of biological circadian rhythms and sleep/wake cycle and ending in several psychosomatic troubles and disorders, likely also including cancer, and extending to impairment of performance efficiency as well as family and social life. Appropriate interventions on the organization of shift schedules according to ergonomic criteria and careful health surveillance and social support for shift workers are important preventive and corrective measures that allow people to keep working without significant health impairment.

  10. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  11. Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles[mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a)

  12. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    International Nuclear Information System (INIS)

    2000-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at

  13. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material - including lead plates, lead bricks, and lead-shielded cables was removed during the investigation and requires no additional corrective action.

  14. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  15. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort

  16. Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2006-01-01

    , to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval

  17. A resource pathway to action against discrimination : How burnout and work-family balance form obstacles to action

    NARCIS (Netherlands)

    Stroebe, K.; Missler, M.A.

    2016-01-01

    Why is it difficult for targets to act out against individual experiences of discrimination? Whereas prior research focuses on normative concerns or failure to perceive discrimination as determinants of (lack of) action, we hypothesize that perceiving frequent discrimination at work undermines the

  18. A resource pathway to action against discrimination: How burnout and work-family balance form obstacles to action

    NARCIS (Netherlands)

    Stroebe, Katherine; Missler, Marjolein

    2016-01-01

    Why is it difficult for targets to act out against individual experiences of discrimination? Whereas prior research focuses on normative concerns or failure to perceive discrimination as determinants of (lack of) action, we hypothesize that perceiving frequent discrimination at work undermines the

  19. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  20. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  1. Development and verification for review plan of emergency action level (EAL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Emergency action levels (EALs) are used as the trigger in order to implement the precautionary protective actions at the nuclear emergency. In this study the framework for applying the EAL in Japan and the process for developing the review plan, such as procedures to review the basis of EAL submitted by the licensee, have been investigated based on the survey for EAL review executed in the United States. In addition, issues to reflect the EAL framework in enhancement of the local government emergency planning and emergency response support system have been investigated. (author)

  2. A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, J [Abt Environmental Research, Boulder, CO (United States); Wagner, C. [Abt Environmental Research, Boulder, CO (United States); Renfrow, S. [Abt Environmental Research, Boulder, CO (United States)

    2015-09-03

    The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

  3. The Impact of the OECD BEPS Action Plan on Finnish Multinational Companies – Case Study

    OpenAIRE

    Hirvinen, Jyri

    2017-01-01

    This research attempts to evaluate the effects that the new OECD BEPS action plan might cause to the companies, main focus being in Finnish multinational companies and in the company being researched in the case study part of the research. The author understands the limitations of the one company case study model in the research but believes that use-ful information can be gained on the effects of the OECD BEPS action plan by examining the changes that the case study company has to go through...

  4. Inventory and action plan for greenhouse gas emissions and capture in the Lower Saint Lawrence

    International Nuclear Information System (INIS)

    Granger, F.; Avoine, G.; Michon, P.-Y.; Drainville, L.

    2003-01-01

    The authors reported on a project designed to provide farmers with concrete information based on data from their enterprise to develop an action plan for the reduction of greenhouse gas emissions. This project involved completing an inventory of greenhouse gas emissions and capture for seven farms located in the Lower Saint Lawrence region of Quebec. The authors presented a balance sheet and action plan for the region under study. A total of six priorities were identified. They encompassed measures such as the optimization of nitrogen management in agricultural soils, to increasing the capture rate of carbon dioxide, and reducing the use of fossil fuels. 6 refs., 6 figs

  5. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  6. The 13 february action plan and the prospects for the North Korean nuclear issue

    International Nuclear Information System (INIS)

    Narushige, Muchishita

    2007-01-01

    On 13 February, the Third Session of the Fifth Round of the Six-Party Talks ended with the adoption of the 'Action Plan' for the implementation of the September 2005 Joint Statement.2 The Action Plan has two phases - the initial phase and the 'next' phase - but the core of the deal lies in the initial stage in which the parties agreed to exchange the nuclear freeze and the provision of energy. In the initial phase, North Korea will 'shut down and seal' the Yongbyon nuclear facility, including the reprocessing facility, and invite back International Atomic Energy Agency (IAEA) personnel to conduct monitoring and verifications within 60 days. In return, the other parties of the talks will provide emergency energy assistance equivalent to 50,000 tons of heavy fuel oil (HFO) to North Korea. There are other items in the initial stage such as North Korea discussing a list of all its nuclear programs with other parties, and the United States and North Korea starting bilateral talks toward full diplomatic relations. However, these items are rather nominal and symbolic in nature and will not likely produce meaningful results in a short period of time. The second phase is even more open-ended. In the second phase, North Korea will provide a complete declaration of all nuclear programs and disable all existing nuclear facilities. In return, the other parties will provide economic, energy and humanitarian assistance up to the equivalent of 950,000 tons of HFO. However, the timing and the details of the nuclear 'disablement' and the provision of assistance are not specified, making it likely that the parties will disagree over how to interpret the words in the Action Plan. The Action Plan provides that five Working Groups (WG) on different topics will be established in order to discuss the details, but the effectiveness of the WG remains to be seen. The Action Plan, therefore, represents the lowest common denominator for the parties involved. In agreeing to the plan, all

  7. The 13 february action plan and the prospects for the North Korean nuclear issue

    Energy Technology Data Exchange (ETDEWEB)

    Narushige, Muchishita

    2007-07-01

    On 13 February, the Third Session of the Fifth Round of the Six-Party Talks ended with the adoption of the 'Action Plan' for the implementation of the September 2005 Joint Statement.2 The Action Plan has two phases - the initial phase and the 'next' phase - but the core of the deal lies in the initial stage in which the parties agreed to exchange the nuclear freeze and the provision of energy. In the initial phase, North Korea will 'shut down and seal' the Yongbyon nuclear facility, including the reprocessing facility, and invite back International Atomic Energy Agency (IAEA) personnel to conduct monitoring and verifications within 60 days. In return, the other parties of the talks will provide emergency energy assistance equivalent to 50,000 tons of heavy fuel oil (HFO) to North Korea. There are other items in the initial stage such as North Korea discussing a list of all its nuclear programs with other parties, and the United States and North Korea starting bilateral talks toward full diplomatic relations. However, these items are rather nominal and symbolic in nature and will not likely produce meaningful results in a short period of time. The second phase is even more open-ended. In the second phase, North Korea will provide a complete declaration of all nuclear programs and disable all existing nuclear facilities. In return, the other parties will provide economic, energy and humanitarian assistance up to the equivalent of 950,000 tons of HFO. However, the timing and the details of the nuclear 'disablement' and the provision of assistance are not specified, making it likely that the parties will disagree over how to interpret the words in the Action Plan. The Action Plan provides that five Working Groups (WG) on different topics will be established in order to discuss the details, but the effectiveness of the WG remains to be seen. The Action Plan, therefore, represents the lowest common denominator for the parties

  8. National action plan to reduce smoking during pregnancy: the National Partnership to Help Pregnant Smokers Quit.

    Science.gov (United States)

    Orleans, Tracy; Melvin, Cathy; Marx, Joseph; Maibach, Edward; Vose, Kathryn Kahler

    2004-04-01

    Although there has been remarkable progress and momentum toward achieving smoke-free pregnancies in the United States since 1990, concerted action is needed to close the remaining gaps in treatment and prevention so that we can reach the Healthy People 2010 goal for pregnant smokers: a prevalence of 1% or less. This need for action led to the formation of the National Partnership to Help Pregnant Smokers Quit, a collaboration among more than 50 organizations and agencies, public and private, that have joined forces to help pregnant smokers quit by providing proven clinical and community-based interventions to every pregnant smoker. This article summarizes the action plan developed by the partnership, the strategies it outlines, and some of the actions taken by partners over the past year to put the plan into action. Action is planned and progress is being made in five strategic areas: offering help through the health care system; using the media effectively; harnessing community and worksite resources; promoting policies known to increase smoking cessation efforts and successes; and expanding national research, surveillance, and evaluation efforts.

  9. Analysis of the CNSC Staffs Action Plan to Reflect Lessons Learned from Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sangkyu; Yune, Young Gill; Ahn, Hyungjoon; Kim, Byungjik; Lee, Jinho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    On September 30, 2011, the Task Force completed its review and presented the public with the findings and recommendations in the CNSC Fukushima Task Force Report. The Task Force made 13 recommendations to further enhance the safety of nuclear power plants in Canada. After that, the CNSC established the CNSC Staffs Action Plan based on the Fukushima Task Force's recommendations. In Canada, 19 nuclear power reactor units are currently producing electric power, and all of them are pressurized heavy water-reactor (PHWR) types. Also, considering 2 power reactor units in Korea, Wolsung unit 1 and 2, are the same reactor type, the analysis of the CNSC Staffs Action Plan will be of benefit to determining recommendations of Korea to address lessons learned from the Fukushima Daiichi nuclear power plant. Therefore, the CNSC Staffs Action Plan was introduced and analyzed in this study. From the results of the above analysis, it is recognized that the strengthening of defense in depth, emergency preparedness and the regulatory oversight of nuclear power plants in Canada were emphasized and much similar to practices of other countries. Public consultation process establishing the CNSC Staffs action plan has been carried out several times, in order to ensure regulatory transparency, by the CNSC staffs, and this is comparable with other countries. It is expected that the detail analysis results of the above plan will be helpful to enhance the safety of domestic operating nuclear power plants.

  10. Factors associated with ownership and use of written asthma action plans in North-West Melbourne.

    Science.gov (United States)

    Sulaiman, N D; Barton, C A; Abramson, M J; Liaw, T; Harris, C; Chondros, P; Dharmage, S; Clarke, D

    2004-12-01

    Written asthma action plans (WAAPs) have become a core component of asthma management in Australia. We investigated ownership, utilisation and factors associated with ownership of asthma action plans by caregivers. 443/776 (57%) caregivers of children aged 2-14 years with asthma were identified from 32 GP clinics as part of a randomised controlled trial (RCT), and completed self-administered questionnaires. Only 29% of participants owned a WAAP, while 13% possessed verbal instructions, and 56% had no plan. An asthma action plan for children, which was developed by a general practitioner (GP) was more likely to comprise verbal instructions (p = 0.001), while action plans developed by paediatricians were more likely to be written (p time they visited their doctor for asthma. Factors associated with WAAP ownership included nights waking (p = 0.013), self reported severity (p = 0.001), and days lost from school (p = 0.037). Children who had seen a GP in the last 3 months for asthma, or who had been to the Emergency Department (ED) or hospital were more likely to possess a WAAP (p < 0.001). Caregivers who were less satisfied with their child's asthma control were more likely to own a WAAP (p = 0.037). Caregivers with any action plan found it useful and 82% reported using their action plan for management of an acute attack. However, caregivers with a WAAP were more likely to adhere to the plan for an acute attack compared to caregivers with verbal instructions (OR = 4.5, p < 0.05). Caregivers with a WAAP were more knowledgeable about asthma (p = 0.002), better able to recognise the difference between preventer and reliever medications (p = 0.01), and better able to recognise an asthma attack (p = 0.006). Ownership of WAAPs in this group was still too low. Importantly, caregivers with written instructions were more knowledgeable about asthma and more likely to report following the action plan during an asthma attack.

  11. Local actions to reduce greenhouse gas emissions in the context of national action plans

    International Nuclear Information System (INIS)

    Harvey, L.D.D.

    1995-01-01

    Municipalities can play a number of important roles to complement national actions to limit greenhouse gas emissions: (i) by facilitating comprehensive, city-wide building retrofit activities; (ii) by facilitating the development and/or expansion of community integrated energy systems involving district heating, district cooling, and cogeneration of electricity; and (iii) by promoting urban intensification to reduce the need to use the private automobile. Innovative institutional and financial mechanism are needed to overcome some of the persistent barriers to more efficient energy use in buildings and a number of concepts, which are currently being considered by the City of Toronto as part of its programme to reduce CO 2 emissions by 20% from the 1988 level by 2005, are discussed here. These concepts involve using public securitization funds to leverage private sector funds for energy efficiency retrofits and a number of measures to reduce financing and retrofit transaction costs. Even where surplus electricity generating capacity exists at the regional scale, reduced electricity demand can still result in avoided utility system costs if transmission bottlenecks and future transmission and transformer upgrade costs are reduced. Finally, given the need to replace or modify many of the existing commercial chillers due to the phase out of CFC's, a window of opportunity exists during the next few years to provide alternative, chlorocarbon-free district cooling systems based on absorption chillers using waste heat from electricity generation, with significant (30-65%) CO 2 emission savings. (au)

  12. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  13. Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities

  14. Corrective Action Investigation Plan for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, Revision No.:0

    International Nuclear Information System (INIS)

    2002-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL, Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium

  15. Work plan, AP-102 mixer pump removal and pump replacement

    International Nuclear Information System (INIS)

    Jimenez, R.F.

    1994-01-01

    The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken

  16. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    Science.gov (United States)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking

  17. Disentangling self-management goal setting and action planning: A scoping review.

    Directory of Open Access Journals (Sweden)

    Stephanie Anna Lenzen

    Full Text Available The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used.A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used.Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up. Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67% did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60% focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47% reported a theoretical framework.The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might

  18. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  19. European Climate Change Programme. Working Group II. Impacts and Adaptation. Urban Planning and Construction. Sectoral Report

    International Nuclear Information System (INIS)

    2007-03-01

    Adaptation is a new policy area for the European Climate Change Policy. The Impacts and Adaptation Workgroup has been set up as part of European Climate Change Programme (ECCP II). The main objective of the workgroup is to explore options to improve Europe's resilience to climate change impacts, to encourage the integration of climate change adaptation into other policy areas at the European, national, regional and local level and to define the role of EU-wide policies complementing action by Member States. The aim of this initial programme of work is to identify good practice in the development of adaptation policy and foster learning from different sectoral experiences and explore a possible EU role in adaptation policies. The Commission has led a series of 10 sectoral meetings looking at adaptation issues for different sectors. One of these meetings looked at the impacts on urban planning and infrastructure in particular. This report summarises the state of play in the urban planning sector in relation to adaptation to climate change on the basis of the information gathered at the stakeholder meeting. Some of the other stakeholder meetings, such as the meeting on human health, have a strong connection with the urban planning agenda. Therefore, some actions in the sector report on adaptation and human health relate to urban planning and infrastructure considerations

  20. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national