WorldWideScience

Sample records for action scheduling tool

  1. Model-based development of a course of action scheduling tool

    DEFF Research Database (Denmark)

    Kristensen, Lars Michael; Mechlenborg, Peter; Zhang, Lin

    2008-01-01

    This paper shows how a formal method in the form of Coloured Petri Nets (CPNs) and the supporting CPN Tools have been used in the development of the Course of Action Scheduling Tool (COAST). The aim of COAST is to support human planners in the specification and scheduling of tasks in a Course...... of Action. CPNs have been used to develop a formal model of the task execution framework underlying COAST. The CPN model has been extracted in executable form from CPN Tools and embedded directly into COAST, thereby automatically bridging the gap between the formal specification and its implementation....... The scheduling capabilities of COAST are based on state space exploration of the embedded CPN model. Planners interact with COAST using a domain-specific graphical user interface (GUI) that hides the embedded CPN model and analysis algorithms. This means that COAST is based on a rigorous semantical model...

  2. Recovery Action Mapping Tool

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Recovery Action Mapping Tool is a web map that allows users to visually interact with and query actions that were developed to recover species listed under the...

  3. A Network Simulation Tool for Task Scheduling

    Directory of Open Access Journals (Sweden)

    Ondřej Votava

    2012-01-01

    Full Text Available Distributed computing may be looked at from many points of view. Task scheduling is the viewpoint, where a distributed application can be described as a Directed Acyclic Graph and every node of the graph is executed independently. There are, however, data dependencies and the nodes have to be executed in a specified order. Hence the parallelism of the execution is limited. The scheduling problem is difficult and therefore heuristics are used. However, many inaccuracies are caused by the model used for the system, in which the heuristics are being tested. In this paper we present a tool for simulating the execution of the distributed application on a “real” computer network, and try to tell how the executionis influenced compared to the model.

  4. INTERACTIVE TOOL FOR SCHEDULING JOBS IN A FLEXIBLE MANUFACTURING ENVIRONMENT

    NARCIS (Netherlands)

    SLOMP, J; GUPTA, JND

    1992-01-01

    This paper describes an innovative interactive decision making tool for scheduling jobs in a flexible manufacturing environment. While the proposed tool provides computer integrated mechanism for scheduling jobs to the flexible manufacturing systems, it retains the human touch needed to augment

  5. Cyclic machine scheduling with tool transportation - additional calculations

    NARCIS (Netherlands)

    Kuijpers, C.M.H.

    2001-01-01

    In the PhD Thesis of Kuijpers a cyclic machine scheduling problem with tool transportation is considered. For the problem with two machines, it is shown that there always exists an optimal schedule with a certain structure. This is done by means of an elaborate case study. For a number of cases some

  6. Gain Scheduling of Observer-Based Controllers with Integral Action

    DEFF Research Database (Denmark)

    Trangbæk, Klaus; Stoustrup, Jakob; Bendtsen, Jan Dimon

    2006-01-01

     This paper presents a method for continuous gain scheduling of  observer-based controllers with integral action. Given two stabilising controllers for a given system, explicit state space formulae are presented, allowing to change gradually from one  controller to the other while preserving...

  7. An Automated Tool for Optimizing Waste Transportation Routing and Scheduling

    International Nuclear Information System (INIS)

    Berry, L.E.; Branch, R.D.; White, H.A.; Whitehead, H. D. Jr.; Becker, B.D.

    2006-01-01

    An automated software tool has been developed and implemented to increase the efficiency and overall life-cycle productivity of site cleanup by scheduling vehicle and container movement between waste generators and disposal sites on the Department of Energy's Oak Ridge Reservation. The software tool identifies the best routes or accepts specifically requested routes and transit times, looks at fleet availability, selects the most cost effective route for each waste stream, and creates a transportation schedule in advance of waste movement. This tool was accepted by the customer and has been implemented. (authors)

  8. A Multiple Criteria Genetic Algorithm Scheduling Tool for Production Scheduling in the Capital Goods Industry

    Directory of Open Access Journals (Sweden)

    Wenbin Xie

    2014-01-01

    Full Text Available Production planners usually aim to satisfy multiple objectives. This paper describes the development of a genetic algorithm tool that finds optimum trade-offs among delivery performance, resource utilisation, and workin-progress inventory. The tool was specifically developed to meet the requirements of capital goods companies that manufacture products with deep and complex product structures with components that have long and complicated routings. The model takes into account operation and assembly precedence relationships and finite capacity constraints. The tool was tested using various production problems that were obtained from a collaborating company. A series of experiments showed the tool provides a set of non-dominated solutions that enable the planner to choose an optimum trade-off according to their preferences. Previous research had optimised a single objective function. This is the first scheduling tool of its type that has simultaneously optimised delivery performance, resource utilisation and work-in-progress inventory. The quality of the schedules produced was significantly better than the approaches used by the collaborating company.

  9. Dynamic Action Scheduling in a Parallel Database System

    NARCIS (Netherlands)

    Grefen, P.W.P.J.; Apers, Peter M.G.

    This paper describes a scheduling technique for parallel database systems to obtain high performance, both in terms of response time and throughput. The technique enables both intra- and inter-transaction parallelism while controlling concurrency between transactions correctly. Scheduling is

  10. Biopharmaceutical Process Optimization with Simulation and Scheduling Tools.

    Science.gov (United States)

    Petrides, Demetri; Carmichael, Doug; Siletti, Charles; Koulouris, Alexandros

    2014-09-29

    Design and assessment activities associated with a biopharmaceutical process are performed at different levels of detail, based on the stage of development that the product is in. Preliminary "back-of-the envelope" assessments are performed early in the development lifecycle, whereas detailed design and evaluation are performed prior to the construction of a new facility. Both the preliminary and detailed design of integrated biopharmaceutical processes can be greatly assisted by the use of process simulators, discrete event simulators or finite capacity scheduling tools. This report describes the use of such tools for bioprocess development, design, and manufacturing. The report is divided into three sections. Section One provides introductory information and explains the purpose of bioprocess simulation. Section Two focuses on the detailed modeling of a single batch bioprocess that represents the manufacturing of a therapeutic monoclonal antibody (MAb). This type of analysis is typically performed by engineers engaged in the development and optimization of such processes. Section Three focuses on production planning and scheduling models for multiproduct plants.

  11. Biopharmaceutical Process Optimization with Simulation and Scheduling Tools

    Directory of Open Access Journals (Sweden)

    Demetri Petrides

    2014-09-01

    Full Text Available Design and assessment activities associated with a biopharmaceutical process are performed at different levels of detail, based on the stage of development that the product is in. Preliminary “back-of-the envelope” assessments are performed early in the development lifecycle, whereas detailed design and evaluation are performed prior to the construction of a new facility. Both the preliminary and detailed design of integrated biopharmaceutical processes can be greatly assisted by the use of process simulators, discrete event simulators or finite capacity scheduling tools. This report describes the use of such tools for bioprocess development, design, and manufacturing. The report is divided into three sections. Section One provides introductory information and explains the purpose of bioprocess simulation. Section Two focuses on the detailed modeling of a single batch bioprocess that represents the manufacturing of a therapeutic monoclonal antibody (MAb. This type of analysis is typically performed by engineers engaged in the development and optimization of such processes. Section Three focuses on production planning and scheduling models for multiproduct plants.

  12. A NEW MANAGERIAL TOOL FOR SCENARIOS IN SCHEDULING

    Directory of Open Access Journals (Sweden)

    GEORGE CRISTIAN GRUIA

    2014-11-01

    Full Text Available The purpose of this paper is to introduce a newly developed managerial tool, Quality Scheduling Index (QSI, which can be used at the improvement of quality and time consumption within not only manufacturing companies. The authors present this tool as a result of the actual market conditions of finding a way for managing and controlling the usage of time, quality of work and the costs associated with these two factors. The paper is focused on the area of Management of Production and Operations with the main goal of developing the area of scheduling research and main purpose of increasing the productivity of a manufacturing enterprise by using at maximum the available resources, without any additional costs or investments. A survey is realized regarding the market requirements and partial empirical results of the authors’ researches are presented, with conclusions being drawn for future studies. A scenario mainframe is also developed and a relation between QSI and scenarios is presented. The paper represents partial results of the grant projects GAČR P403/12/1950 and SGS13/191/OHK2/3T/12.

  13. A NEW MANAGERIAL TOOL FOR SCENARIOS IN SCHEDULING

    Directory of Open Access Journals (Sweden)

    George Cristian GRUIA

    2014-05-01

    Full Text Available The purpose of this paper is to introduce a newly developed managerial tool, Quality Scheduling Index (QSI, which can be used at the improvement of quality and time consumption within not only manufacturing companies. The authors present this tool as a result of the actual market conditions of finding a way for managing and controlling the usage of time, quality of work and the costs associated with these two factors. The paper is focused on the area of Management of Production and Operations with the main goal of developing the area of scheduling research and main purpose of increasing the productivity of a manufacturing enterprise by using at maximum the available resources, without any additional costs or investments. A survey is realized regarding the market requirements and partial empirical results of the authors’ researches are presented, with conclusions being drawn for future studies. A scenario mainframe is also developed and a relation between QSI and scenarios is presented. The paper represents partial results of the grant projects GAČR P403/12/1950 and SGS13/191/OHK2/3T/12.

  14. 21 CFR 1301.32 - Action on applications for research in Schedule I substances.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Action on applications for research in Schedule I... REGISTRATION OF MANUFACTURERS, DISTRIBUTORS, AND DISPENSERS OF CONTROLLED SUBSTANCES Action on Application for Registration: Revocation Or Suspension of Registration § 1301.32 Action on applications for research in...

  15. Action-Oriented Benchmarking: Concepts and Tools

    Energy Technology Data Exchange (ETDEWEB)

    California Energy Commission; Mathew, Paul; Mills, Evan; Mathew, Paul; Piette, Mary Ann; Bourassa, Norman; Brook, Martha

    2008-02-13

    Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article--Part 1 of a two-part series--we describe an 'action-oriented benchmarking' approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful metrics and to identify, screen and prioritize potential efficiency improvements. This opportunity assessment process can then be used to inform and optimize a full-scale audit or commissioning process. We introduce a new web-based action-oriented benchmarking system and associated software tool-EnergyIQ. The benchmarking methods, visualizations, and user interface design are informed by an end-user needs assessment survey and best-practice guidelines from ASHRAE.

  16. Simultaneous Scheduling of Jobs, AGVs and Tools Considering Tool Transfer Times in Multi Machine FMS By SOS Algorithm

    Science.gov (United States)

    Sivarami Reddy, N.; Ramamurthy, D. V., Dr.; Prahlada Rao, K., Dr.

    2017-08-01

    This article addresses simultaneous scheduling of machines, AGVs and tools where machines are allowed to share the tools considering transfer times of jobs and tools between machines, to generate best optimal sequences that minimize makespan in a multi-machine Flexible Manufacturing System (FMS). Performance of FMS is expected to improve by effective utilization of its resources, by proper integration and synchronization of their scheduling. Symbiotic Organisms Search (SOS) algorithm is a potent tool which is a better alternative for solving optimization problems like scheduling and proven itself. The proposed SOS algorithm is tested on 22 job sets with makespan as objective for scheduling of machines and tools where machines are allowed to share tools without considering transfer times of jobs and tools and the results are compared with the results of existing methods. The results show that the SOS has outperformed. The same SOS algorithm is used for simultaneous scheduling of machines, AGVs and tools where machines are allowed to share tools considering transfer times of jobs and tools to determine the best optimal sequences that minimize makespan.

  17. Infrared thermometry as a tool for site-specific irrigation scheduling

    Science.gov (United States)

    Ground-based infrared thermometry has been used as a tool to provide a non-invasive method to detect crop water stress and schedule irrigations. However, studies are limited on the use of infrared thermometry for irrigation scheduling with variable rate irrigation (VRI) systems. This study describes...

  18. A positive action handling tool for TRIGA fuel

    International Nuclear Information System (INIS)

    McMaster, Ira B.

    1976-01-01

    Because several elements have disengaged accidentally from the conventional fuel handling tool at the PSBR a need was apparent for a tool whose action was more positive. The new design utilizes rotary motion to provide a positive locking action when the tool engages an element. This action provides a secure grip on the element and positive control by the tool operator over when an element can disengage from the tool. The convenience provided by the flexibility of the original tool is retained by making the lower four feet of the new tool flexible. (author)

  19. A Graph-Based Approach to Action Scheduling in a Parallel Database System

    NARCIS (Netherlands)

    Grefen, P.W.P.J.; Apers, Peter M.G.

    Parallel database machines are meant to obtain high performance in transaction processing, both in terms of response time adn throughput. To obtain high performance, a good scheduling of the execution of the various actions in transactions is crucial. This paper describes a graph-based technique for

  20. Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

    Science.gov (United States)

    Chevalley, Eric; Parke, Bonny; Kraut, Josh M.; Bienert, Nancy; Omar, Faisal; Palmer, Everett A.

    2015-01-01

    In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex

  1. Minimizing the total tardiness for the tool change scheduling problem on parallel machines

    Directory of Open Access Journals (Sweden)

    Antonio Costa

    2016-04-01

    Full Text Available This paper deals with the total tardiness minimization problem in a parallel machines manufacturing environment where tool change operations have to be scheduled along with jobs. The mentioned issue belongs to the family of scheduling problems under deterministic machine availability restrictions. A new model that considers the effects of the tool wear on the quality characteristics of the worked product is proposed. Since no mathematical programming-based approach has been developed by literature so far, two distinct mixed integer linear programming models, able to schedule jobs as well as tool change activities along the provided production horizon, have been devised. The former is an adaptation of a well-known model presented by the relevant literature for the single machine scheduling problem with tool changes. The latter has been specifically developed for the issue at hand. After a theoretical analysis aimed at revealing the differences between the proposed mathematical models in terms of computational complexity, an extensive experimental campaign has been fulfilled to assess performances of the proposed methods under the CPU time viewpoint. Obtained results have been statistically analyzed through a properly arranged ANOVA analysis.

  2. The potential application of military fleet scheduling tools to the Federal Waste Management System Transportation System

    International Nuclear Information System (INIS)

    Harrison, I.G.; Pope, R.B.; Kraemer, R.D.; Hilliard, M.R.

    1991-01-01

    This paper discusses the feasibility of adapting concepts and tools that were developed for the US military's transportation management systems to the management of the Federal Waste Management System's (FWMS) Transportation System. Many of the lessons in the development of the planning and scheduling software for the US military are applicable to the development of similar software for the FWMS Transportation System. The resulting system would be invaluable to the US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM), both initially, for long-range planning, and later, in day-to-day scheduling and management activities

  3. RISK COMMUNICATION IN ACTION: THE TOOLS OF MESSAGE MAPPING

    Science.gov (United States)

    Risk Communication in Action: The Tools of Message Mapping, is a workbook designed to guide risk communicators in crisis situations. The first part of this workbook will review general guidelines for risk communication. The second part will focus on one of the most robust tools o...

  4. Tools and techniques for schedule's controlling: tracking system and control of Urucu-Manaus gas-pipeline construction, stretch B1

    Energy Technology Data Exchange (ETDEWEB)

    Zuany, Valdenise Marques; Dias, Jose Luiz Gomes [CONCREMAT Engenharia e Tecnologia S/A, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The goal is to show the monitoring systems and deadline control, using the PMBOK{sup R} project management tools, in the Construction and Assembly of the Coari-Manaus Gas-pipeline, stretch B1, which includes the cities of Coari, Codajas, Anori and Anama, in the state of Amazon, in the Northern Undertaking Implementation (IENOR), an Engineering division of the PETROBRAS System. This report presents the practical effects of the usage of three schedule control tools of the project: Performance Measurement, using the technique of the Earned Value Management (EVM), which integrates cost, schedule and physical progress of the enterprise to determine the variations of schedule and performance; Project Management Software, MSProject, which allows schedule's elaboration and makes the tracking of the planned dates possible (baseline) in relation to real dates and forecasts the trend level, the effects of changes in the project's schedule, demonstrating its utility as a schedule control tool; and Schedule Variance Analysis, which adopts practical data to reach the pessimistic, most likely and optimistic expectations. The implantation of these tools was based in the Work Breakdown Structure of the enterprise. The application of these three tools in the tracking and control of the enterprise demonstrates that, the use of information and techniques deriving from the planning and control can be an important support for project management and decision taking, comparing the results gotten in the implantation of the plan with its actual realization, defining, thus, the necessary corrective actions, generating learned lessons to use in future projects. (author)

  5. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    Science.gov (United States)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  6. An Overview Of Tool For Response Action Cost Estimating (TRACE)

    International Nuclear Information System (INIS)

    Ferries, S.R.; Klink, K.L.; Ostapkowicz, B.

    2012-01-01

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel(reg s ign) workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  7. The use of web2 tools in action research

    DEFF Research Database (Denmark)

    Kolbæk, Raymond; Steensgaard, Randi; Angel, Sanne

    2017-01-01

    . Furthermore we try to evidence-based the concept of "Sample handlings" and examines whether this concept can be used as a flexible methodological tool for developing workflow that promotes patient participation in their own rehabilitation. We use a action research design to identify actual problems, develop...... and the researchers themselves have felt strange and confused about the use of online tools. For example, some of the participants did not want to use Facebook as a communication medium, as several did not have a Facebook account, while others would not want to mix work and leisure together. The web2 tools used...

  8. Operational controlling - a tool of translating strategy into action

    Directory of Open Access Journals (Sweden)

    2011-03-01

    Full Text Available . Enterprises have a lot of problems with realization their strategic aims in the fast changing and competitive business arena from many years. Effective execution of strategic plan needs its translating into action, task results and indicators of everyday activities. The success on the market is attainable by communicating strategic and operating goals on the each level of organizational structure and their connecting with budget of units or employee motivation. The scorecards balancing in finance, customer, process and development perspectives is very useful for pointing - what do we control with? or - what do we have to achieve? But doesn't answer to question about ways of enterprise managing. Main aim of the article is proving that operational controlling system is a essential tool for translating strategy into action. The Balanced Scorecard methodology should to take into consideration system and process connection of enterprise with procurement, co-operation or distribution supply chain also.

  9. Manufacturing scheduling systems an integrated view on models, methods and tools

    CERN Document Server

    Framinan, Jose M; Ruiz García, Rubén

    2014-01-01

    The book is devoted to the problem of manufacturing scheduling, which is the efficient allocation of jobs (orders) over machines (resources) in a manufacturing facility. It offers a comprehensive and integrated perspective on the different aspects required to design and implement systems to efficiently and effectively support manufacturing scheduling decisions. Obtaining economic and reliable schedules constitutes the core of excellence in customer service and efficiency in manufacturing operations. Therefore, scheduling forms an area of vital importance for competition in manufacturing companies. However, only a fraction of scheduling research has been translated into practice, due to several reasons. First, the inherent complexity of scheduling has led to an excessively fragmented field in which different sub problems and issues are treated in an independent manner as goals themselves, therefore lacking a unifying view of the scheduling problem. Furthermore, mathematical brilliance and elegance has sometime...

  10. From Provenance Standards and Tools to Queries and Actionable Provenance

    Science.gov (United States)

    Ludaescher, B.

    2017-12-01

    The W3C PROV standard provides a minimal core for sharing retrospective provenance information for scientific workflows and scripts. PROV extensions such as DataONE's ProvONE model are necessary for linking runtime observables in retrospective provenance records with conceptual-level prospective provenance information, i.e., workflow (or dataflow) graphs. Runtime provenance recorders, such as DataONE's RunManager for R, or noWorkflow for Python capture retrospective provenance automatically. YesWorkflow (YW) is a toolkit that allows researchers to declare high-level prospective provenance models of scripts via simple inline comments (YW-annotations), revealing the computational modules and dataflow dependencies in the script. By combining and linking both forms of provenance, important queries and use cases can be supported that neither provenance model can afford on its own. We present existing and emerging provenance tools developed for the DataONE and SKOPE (Synthesizing Knowledge of Past Environments) projects. We show how the different tools can be used individually and in combination to model, capture, share, query, and visualize provenance information. We also present challenges and opportunities for making provenance information more immediately actionable for the researchers who create it in the first place. We argue that such a shift towards "provenance-for-self" is necessary to accelerate the creation, sharing, and use of provenance in support of transparent, reproducible computational and data science.

  11. How to Compute a Slot Marker - Calculation of Controller Managed Spacing Tools for Efficient Descents with Precision Scheduling

    Science.gov (United States)

    Prevot, Thomas

    2012-01-01

    This paper describes the underlying principles and algorithms for computing the primary controller managed spacing (CMS) tools developed at NASA for precisely spacing aircraft along efficient descent paths. The trajectory-based CMS tools include slot markers, delay indications and speed advisories. These tools are one of three core NASA technologies integrated in NASAs ATM technology demonstration-1 (ATD-1) that will operationally demonstrate the feasibility of fuel-efficient, high throughput arrival operations using Automatic Dependent Surveillance Broadcast (ADS-B) and ground-based and airborne NASA technologies for precision scheduling and spacing.

  12. Education tools for entrepreneurship creating an action-learning environment through educational learning tools

    CERN Document Server

    Gómez, Jaime; Vélez-Torres, Francisco; Rueda-Armengot, Carlos

    2016-01-01

    This book examines education in entrepreneurship through an action-learning environment that employs various education tools, technology tools and pedagogical methods being implemented into university curriculums around the world. Entrepreneurship in all of its aspects, connotations, and applications has undoubtedly become a major force for new and sustainable wealth creation in both emerging and developed economies. This notion has been encouraging universities to incorporate entrepreneurship-related competencies into the curriculums of almost all subjects, as researchers, educators, and administrators alike acknowledge that students must be fully engaged and prepared to thrive in a society increasingly defined by innovation. In this context, the primary challenge consists in how to inspire or work beyond the mental limits in the classroom; to determine which learning platforms are required or useful to unlock and stimulate creativity and eliminate the human aversion to failure. Featuring contributions and c...

  13. Usability Improvement for Data Input into the Fatigue Avoidance Scheduling Tool (FAST)

    National Research Council Canada - National Science Library

    Miller, James C

    2005-01-01

    ...) data input mode than using the graphic schedule input mode. The Grid input mode provided both a statistically and an operationally significant reduction in data input time, compared to the Graphic mode for both novice...

  14. A Self-Regulated Learning Approach: A Mobile Context-aware and Adaptive Learning Schedule (mCALS Tool

    Directory of Open Access Journals (Sweden)

    J.Y-K. Yau

    2008-07-01

    Full Text Available Abstract—Self-regulated students are able to create andmaximize opportunities they have for studying or learning.We combine this learning approach with our MobileContext-aware and Adaptive Learning Schedule (mCALStool which will create and enhance opportunities forstudents to study or learn in different locations. Thelearning schedule is used for two purposes, a to helpstudents organize their work and facilitate timemanagement, and b for capturing the users’ activitieswhich can be retrieved and translated as learning contextslater by our tool. These contexts are then used as a basis forselecting appropriate learning materials for the students.Using a learning schedule to capture and retrieve contexts isa novel approach in the context-aware mobile learning field.In this paper, we present the conceptual model andpreliminary architecture of our mCALS tool, as well as ourresearch questions and methodology for evaluating it. Thelearning materials we intend to use for our tool will be Javafor novice programmers. This is appropriate because largeamounts of time and motivation are necessary to learn anobject-oriented programming language such as Java, andwe are currently seeking ways to facilitate this for noviceprogrammers.

  15. Embodied representation of tool-use action verbs and hand action verbs: evidence from a tone judgment task.

    Science.gov (United States)

    Yang, Jie; Shu, Hua

    2011-04-15

    Many studies have found that language comprehension involves sensory-motor system. However, the relationship between word form and embodied semantic representation still lacks evidence. The current fMRI study used Chinese tool-use action verbs, hand action verbs and a Mandarin lexical tone task to explore the issue. In the tone task, all verbs showed strong effects in hand motor areas. However, the contrasts between the hand action verbs and the tool-use action verbs yielded differences mainly in tone processing areas, and the hand action verbs had stronger effects. The ROI analyses indicated consistent result pattern with the contrast analyses. In short, these results revealed that word processing involves basic sensory-motor information automatically, whereas the fine grained information which distinguishes among different semantics can be hindered by the processing of word form. Published by Elsevier Ireland Ltd.

  16. Soil capacitance sensors and stem dendrometers. Useful tools for irrigation scheduling of commercial orchards?

    Energy Technology Data Exchange (ETDEWEB)

    Bonet, L.; Ferrer, P.; Castel, J. R.; Intrigliolo, D. S.

    2010-07-01

    Irrigation scheduling is often performed based on a soil water balance, where orchard evapotranspiration is estimated using the reference evapotranspiration (ETo) times the crop coefficient (Kc). This procedure, despite being widely spread, has some uncertainties. Because of this, plant and soil water status monitoring could be alternatively or complementarity used to schedule irrigation. The usefulness of capacitance probes was evaluated during several seasons in large irrigation districts where irrigation practices were changed over years from the ETo * Kc model to the analysis of soil water status trend. This area corresponds to drip irrigated orchards planted with citrus, peach, nectarine and persimmon. Around 25% less irrigation was applied with no substantial yield penalty when the information provided by capacitance probes was correctly applied for irrigation management. On the other hand, the usefulness of stem dendrometers for continuously monitoring plant water status was evaluated in a young plum experimental orchard. Over two years, irrigation was scheduled using exclusively trunk shrinkage via the signal intensity approach by means of a baseline equation previously obtained in the orchard. Results showed that it was not always possible to schedule irrigation based on the trunk shrinkage signal intensity due to the temporal changes in the reference values that occurred as trees aged. Overall, results obtained are discussed in terms of the possible extrapolation at field level of both capacitance probes and stem dendrometers. Advantages and drawbacks of each technique are analyzed and discussed. (Author) 34 refs.

  17. The Role of Expertise in Tool Use: Skill Differences in Functional Action Adaptations to Task Constraints

    Science.gov (United States)

    Bril, Blandine; Rein, Robert; Nonaka, Tetsushi; Wenban-Smith, Francis; Dietrich, Gilles

    2010-01-01

    Tool use can be considered a particularly useful model to understand the nature of functional actions. In 3 experiments, tool-use actions typified by stone knapping were investigated. Participants had to detach stone flakes from a flint core through a conchoidal fracture. Successful flake detachment requires controlling various functional…

  18. Cell transfection as a tool to study growth hormone action

    DEFF Research Database (Denmark)

    Norstedt, G; Enberg, B; Francis, S

    1994-01-01

    of cellular function that mimic those of the endogenous GHR. GHR cDNA transfected cells also offer a system where the mechanism of GH action can be studied. Such a system has been used to demonstrate that the GHR itself becomes tyrosine phosphorylated and that further phosphorylation of downstream proteins...... is important in GH action. The GH signals are transmitted to the nucleus and GH regulated genes have now begun to be characterized. The ability to use cell transfection for mechanistic studies of GH action will be instrumental to define domains within the receptor that are of functional importance...

  19. Searching for New Directions: Developing MA Action Research Project as a Tool for Teaching

    Science.gov (United States)

    Lee, Young Ah; Wang, Ye

    2012-01-01

    Action research has been recognized as a useful professional development tool for teaching, but for inservice teachers, conducting action research can be challenging. Their learning about action research can be influenced by social situations--whether in an MA (Master of Arts) program or other professional development. The purpose of this…

  20. Solving dynamic resource constraint project scheduling problems using new constraint programming tools

    OpenAIRE

    Elkhyari, Abdallah; Guéret, Christelle; Jussien, Narendra

    2003-01-01

    Timetabling problems have been studied a lot over the last decade. Due to the complexity and the variety of such problems, most work concern static problems in which activities to schedule and resources are known in advance, and constraints are fixed. However, every timetabling problem is subject to unexpected events (consider for example, for university timetabling problems, a missing teacher, or a slide projector breakdoawn). In such a situation, one has to quickly build a new solution whic...

  1. Do human brain areas involved in visuomotor actions show a preference for real tools over visually similar non-tools?

    Science.gov (United States)

    Macdonald, Scott N; Culham, Jody C

    2015-10-01

    Neuroimaging has revealed a left-lateralized network of brain areas implicated in understanding the conceptual and sensorimotor aspects of tool perception and tool use. Often this network of areas is identified by contrasting brain activity when participants view pictures of tools vs. pictures of non-tools (e.g., animals or buildings). It is unclear, however, what aspect of tools drive activity in the tool network as both tools and non-tools tend to differ in their low-level features. For instance, areas in the tool network may simply activate to elongated objects or to handheld objects over round or ungraspable objects irrespective of object category. To test whether tools indeed drive activity in tool-selective areas over non-tools, participants passively viewed real tools and non-tools matched on low-level features during functional magnetic resonance imaging (fMRI). To maximize the potential for action, participants saw real-tools as opposed to pictures of tools. The non-tools were created by chopping the business ends of tools into pieces and attaching the pieces to both ends of the original tool handles. In doing so, the tools and non-tools were matched for elongation and real-world size. Importantly, tools and non-tools were viewed directly without the use of mirrors and placed within the participants' reach. Stimuli were presented at two opposite horizontal orientations to investigate whether areas that are selective for tools also show greater activation when the tool's handle is directed towards the hand as opposed to away from it. Our results showed that, even after the low-level differences between tools and non-tools were controlled, tools evoked more activation in the tool network as well as in sensorimotor areas. The orientation of the tool handles did not mediate effects within these sensorimotor areas. In sum, when we passively view tools, even without an intent to act, functional associations are automatically evoked and these associations are not

  2. Responding to Cyber Bullying: An Action Tool for School Leaders

    Science.gov (United States)

    Myers, Jill Joline; McCaw, Donna S.; Hemphill, Leaunda S.

    2011-01-01

    A parent brings a cyber bullying incident to your attention and expects you to resolve it. What are the students' rights and your responsibilities according to the law? Because the laws regarding disciplinary action are still evolving, this manual fills the gap by providing public school leaders with data-driven solutions for managing cyber…

  3. Designing appropriate complementary feeding recommendations: tools for programmatic action.

    Science.gov (United States)

    Daelmans, Bernadette; Ferguson, Elaine; Lutter, Chessa K; Singh, Neha; Pachón, Helena; Creed-Kanashiro, Hilary; Woldt, Monica; Mangasaryan, Nuné; Cheung, Edith; Mir, Roger; Pareja, Rossina; Briend, André

    2013-09-01

    Suboptimal complementary feeding practices contribute to a rapid increase in the prevalence of stunting in young children from age 6 months. The design of effective programmes to improve infant and young child feeding requires a sound understanding of the local situation and a systematic process for prioritizing interventions, integrating them into existing delivery platforms and monitoring their implementation and impact. The identification of adequate food-based feeding recommendations that respect locally available foods and address gaps in nutrient availability is particularly challenging. We describe two tools that are now available to strengthen infant and young child-feeding programming at national and subnational levels. ProPAN is a set of research tools that guide users through a step-by-step process for identifying problems related to young child nutrition; defining the context in which these problems occur; formulating, testing, and selecting behaviour-change recommendations and nutritional recipes; developing the interventions to promote them; and designing a monitoring and evaluation system to measure progress towards intervention goals. Optifood is a computer-based platform based on linear programming analysis to develop nutrient-adequate feeding recommendations at lowest cost, based on locally available foods with the addition of fortified products or supplements when needed, or best recommendations when the latter are not available. The tools complement each other and a case study from Peru illustrates how they have been used. The readiness of both instruments will enable partners to invest in capacity development for their use in countries and strengthen programmes to address infant and young child feeding and prevent malnutrition. © 2013 John Wiley & Sons Ltd.

  4. Drip Planner Chart: a simple irrigation scheduling tool for smallholder drip farmers

    NARCIS (Netherlands)

    Boesveld, H.; Zisengwe, L.S.; Yakami, S.

    2012-01-01

    Drip irrigation is widely recognized as potentially one of the most efficient irrigation methods. However, this efficiency is often not achieved because systems are not always well designed or maintained and many farmers lack the tools to assess the crop water requirements and to monitor the soil

  5. Basis of Estimate Software Tool (BEST) - a practical solution to part of the cost and schedule integration puzzle

    International Nuclear Information System (INIS)

    Murphy, L.; Bain, P.

    1997-01-01

    The Basis of Estimate Software Tool (BEST) was developed at the Rocky Flats Environmental Technology Site (Rocky Flats) to bridge the gap that exists in conventional project control systems between scheduled activities, their allocated or assigned resources, and the set of assumptions (basis of estimate) that correlate resources and activities. Having a documented and auditable basis of estimate (BOE) is necessary for budget validation, work scope analysis, change control, and a number of related management control functions. The uniqueness of BEST is demonstrated by the manner in which it responds to the diverse needs of the heavily regulated environmental workplace - containing many features not found in conventional off-the-shelf software products. However, even companies dealing in relatively unregulated work places will find many attractive features in BEST. This product will be of particular interest to current Government contractors and contractors preparing proposals that may require subsequent validation. 2 figs

  6. A planning tool for tree species selection and planting schedule in forestation projects considering environmental and socio-economic benefits.

    Science.gov (United States)

    Rollan, Catherine Denise; Li, Richard; San Juan, Jayne Lois; Dizon, Liezel; Ong, Karl Benedict

    2018-01-15

    Species selection is a crucial step in the planning phase of forestation programs given its impact on the results and on stakeholder interactions. This study develops a planning tool for forestation programs that incorporates the selection of tree species and the scheduling of planting and harvesting, while balancing the maximization of the carbon sequestered and income realized, into the forestation decision-making and planning process. The validation of the goal programming model formulated demonstrates that the characteristics of natural tree species along with the behavior of growth and timing of yield are significant factors in achieving the environmental and socio-economic aspirations. The proposed model is therefore useful in gauging species behavior and performance over time. Sensitivity analysis was also conducted where the behavior of the income generated and carbon sequestered with respect to the external factors such as carbon market prices, percentage area allocated for protection and discount factor was assessed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. 2B-Alert Web: An Open-Access Tool for Predicting the Effects of Sleep/Wake Schedules and Caffeine Consumption on Neurobehavioral Performance.

    Science.gov (United States)

    Reifman, Jaques; Kumar, Kamal; Wesensten, Nancy J; Tountas, Nikolaos A; Balkin, Thomas J; Ramakrishnan, Sridhar

    2016-12-01

    Computational tools that predict the effects of daily sleep/wake amounts on neurobehavioral performance are critical components of fatigue management systems, allowing for the identification of periods during which individuals are at increased risk for performance errors. However, none of the existing computational tools is publicly available, and the commercially available tools do not account for the beneficial effects of caffeine on performance, limiting their practical utility. Here, we introduce 2B-Alert Web, an open-access tool for predicting neurobehavioral performance, which accounts for the effects of sleep/wake schedules, time of day, and caffeine consumption, while incorporating the latest scientific findings in sleep restriction, sleep extension, and recovery sleep. We combined our validated Unified Model of Performance and our validated caffeine model to form a single, integrated modeling framework instantiated as a Web-enabled tool. 2B-Alert Web allows users to input daily sleep/wake schedules and caffeine consumption (dosage and time) to obtain group-average predictions of neurobehavioral performance based on psychomotor vigilance tasks. 2B-Alert Web is accessible at: https://2b-alert-web.bhsai.org. The 2B-Alert Web tool allows users to obtain predictions for mean response time, mean reciprocal response time, and number of lapses. The graphing tool allows for simultaneous display of up to seven different sleep/wake and caffeine schedules. The schedules and corresponding predicted outputs can be saved as a Microsoft Excel file; the corresponding plots can be saved as an image file. The schedules and predictions are erased when the user logs off, thereby maintaining privacy and confidentiality. The publicly accessible 2B-Alert Web tool is available for operators, schedulers, and neurobehavioral scientists as well as the general public to determine the impact of any given sleep/wake schedule, caffeine consumption, and time of day on performance of a

  8. Social Audits for Community Action: A tool to Initiate Community Action for Reducing Child Mortality

    Directory of Open Access Journals (Sweden)

    Nandan D

    2005-01-01

    Full Text Available Research question : (i What is the community′s perception (assessment & analysis of causes underlying neonatal, infant and under five deaths? (ii What action does the community take thereafter? Objectives : To stimulate the community to assess and analyze the causes and underlying social delays responsible for neonatal, infant and under five deaths in their villages and subsequently take collective action to prevent these deaths in future using Social Audits for Community Action (SACA. Design : Retrospective Participatory study. Setting : Rural community development blocks, district Agra, Uttar Pradesh. Material and Methods : SACA were conducted in a total of 152 villages of Fathehpur Sikri and Bichpuri blocks of district Agra, U.P. One SACA was conducted in each of the 211 anganwadi catchment areas, wherein 10-15 women from different socio-clusters of the community participated in a participatory discussion on issues pertaining to number of births and deaths of children less than five years of age in the last one-year. Results : 7656 live births and 749 under-five deaths were reported during the year 2002. The neonatal, infant and under-five mortality rate was 39.4, 73.5 and 85 per 1,000 live births respectively. Hypothermia, pneumonia, birth asphyxia, prematurity and low birth weight emerged as major causes of neonatal deaths. Majority of deaths of infants and children 1-5 years of age were found to have occurred due to severe malnutrition and diarrhoea. The community realized that majority of deaths occurred because of the delay in recognition of the seriousness of problem, delay in taking decision to seek appropriate care and delay in arranging transport/money. Subsequently, behaviour change communication strategies were re-defined to help community assess signs of illness and take preparedness measures to prevent child deaths in future. Conclusion : Strategies like dialoguing with the community using social audits for community action is

  9. The Neuroscience of Storing and Molding Tool Action Concepts: how plastic is grounded cognition?

    Directory of Open Access Journals (Sweden)

    J.C. Mizelle

    2010-11-01

    Full Text Available Choosing how to use tools to accomplish a task is a natural and seemingly trivial aspect of our lives, yet engages complex neural mechanisms. Recently, work in healthy populations has led to the idea that tool knowledge is grounded to allow for appropriate recall based on some level of personal history. This grounding has presumed neural loci for tool use, centered on parieto-temporo-frontal areas to fuse perception and action representations into one dynamic system. A challenge for this idea is related to one of its great benefits. For such a system to exist, it must be very plastic, to allow for the introduction of novel tools or concepts of tool use and modification of existing ones. Thus, learning new tool usage (familiar tools in new situations and new tools in familiar situations must involve mapping into this grounded network while marinating existing rules for tool usage. This plasticity may present a challenging breadth of encoding that needs to be optimally stored and accessed. The aim of this work is to explore the challenges of plasticity related to changing or incorporating representations of tool action within the theory of grounded cognition and propose a modular model of tool-object goal related accomplishment. While considering the neuroscience evidence for this approach, we will focus on the requisite plasticity for this system. Further, we will highlight challenges for flexibility and organization of already grounded tool actions and provide thoughts on future research to better evaluate mechanisms of encoding in the theory of grounded cognition.

  10. Eating tools in hand activate the brain systems for eating action: a transcranial magnetic stimulation study.

    Science.gov (United States)

    Yamaguchi, Kaori; Nakamura, Kimihiro; Oga, Tatsuhide; Nakajima, Yasoichi

    2014-07-01

    There is increasing neuroimaging evidence suggesting that visually presented tools automatically activate the human sensorimotor system coding learned motor actions relevant to the visual stimuli. Such crossmodal activation may reflect a general functional property of the human motor memory and thus can be operating in other, non-limb effector organs, such as the orofacial system involved in eating. In the present study, we predicted that somatosensory signals produced by eating tools in hand covertly activate the neuromuscular systems involved in eating action. In Experiments 1 and 2, we measured motor evoked response (MEP) of the masseter muscle in normal humans to examine the possible impact of tools in hand (chopsticks and scissors) on the neuromuscular systems during the observation of food stimuli. We found that eating tools (chopsticks) enhanced the masseter MEPs more greatly than other tools (scissors) during the visual recognition of food, although this covert change in motor excitability was not detectable at the behavioral level. In Experiment 3, we further observed that chopsticks overall increased MEPs more greatly than scissors and this tool-driven increase of MEPs was greater when participants viewed food stimuli than when they viewed non-food stimuli. A joint analysis of the three experiments confirmed a significant impact of eating tools on the masseter MEPs during food recognition. Taken together, these results suggest that eating tools in hand exert a category-specific impact on the neuromuscular system for eating. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Creating a Healthy School Using the Healthy School Report Card: An ASCD Action Tool. Canadian Second Edition

    Science.gov (United States)

    Lohrmann, David; Vamos, Sandra; Yeung, Paul

    2011-01-01

    How well does your school support the health and well-being of students and staff members? Explore the answer with this ASCD Action Tool and accompanying online scoring and analysis tool. Updated to reflect current research, new standards, and best practices, the Canadian second edition of the action tool guides you through the four steps of the…

  12. Delphi technique as a tool in assessing injury priorities and actions ...

    African Journals Online (AJOL)

    Delphi technique as a tool in assessing injury priorities and actions for injury prevention in the European Union. Delia-Marina Alexe, Ilias Skalkidis, Kiki Petroulaki, Eleni Petridou. Abstract. No Abstract. African Safety Promotion: A Journal of Injury and Violence Prevention Vol. 4(1) 2006: 119-129.

  13. Validation of signal impact assessment tool in order to explore pharmacovigilance signals' follow-up actions

    NARCIS (Netherlands)

    Rolfes, Leàn; Kolfschoten, Judith; Van Hunsel, Florence; Van Puijenbroek, Eugene; van Grootheest, Kees

    2014-01-01

    Background: To determine which actions are advisable for signals arising from a spontaneous reporting system, the Netherlands Pharmacovigilance Centre Lareb uses a Signal Impact Assessment Tool (SIAT). It categorizes signals into one of four categories: strong/moderate signal strength and similarly

  14. Automated Scheduling Tool - (AST)

    Data.gov (United States)

    Department of Homeland Security — Managing Employee Performance, Managing Employee Compensation and Benefits, Administering Health and Safety Activities, Managing Employee Personnel File, Providing...

  15. Action learning: a tool for the development of strategic skills for Nurse Consultants?

    Science.gov (United States)

    Young, Sarah; Nixon, Eileen; Hinge, Denise; McFadyen, Jan; Wright, Vanessa; Lambert, Pauline; Pilkington, Carolyn; Newsome, Christine

    2010-01-01

    This paper will discuss the process of action learning and the outcomes of using action learning as a tool to achieve a more strategic function from Nurse Consultant posts. It is documented that one of the most challenging aspect of Nurse Consultant roles, in terms of leadership, is the strategic contribution they make at a senior corporate Trust level, often across organizations and local health economies. A facilitated action learning set was established in Brighton, England, to support the strategic leadership development of eight nurse consultant posts across two NHS Trusts. Benefits to patient care, with regard to patient pathways and cross-organizational working, have been evident outcomes associated with the nurse consultant posts involved in the action learning set. Commitment by organizational nurse leaders is essential to address the challenges facing nurse consultants to implement change at strategic levels. The use of facilitated action learning had been a successful tool in developing the strategic skills of Nurse Consultant posts within this setting. Action learning sets may be successfully applied to a range of senior nursing posts with a strategic remit and may assist post holders in achieving better outcomes pertinent to their roles.

  16. Left occipitotemporal cortex contributes to the discrimination of tool-associated hand actions: fMRI and TMS evidence

    Directory of Open Access Journals (Sweden)

    Francesca ePerini

    2014-08-01

    Full Text Available Functional neuroimaging studies have implicated the left lateral occipitotemporal cortex (LOTC in both tool and hand perception but the functional role of this region is not fully known. Here, by using a task manipulation, we tested whether tool-/hand-selective LOTC contributes to the discrimination of tool-associated hand actions. Participants viewed briefly presented pictures of kitchen and garage tools while they performed one of two tasks: in the action task, they judged whether the tool is associated with a hand rotation action (e.g., screwdriver or a hand squeeze action (e.g., garlic press, while in the location task they judged whether the tool is typically found in the kitchen (e.g., garlic press or in the garage (e.g., screwdriver. Both tasks were performed on the same stimulus set and were matched for difficulty. Contrasting fMRI responses between these tasks showed stronger activity during the action task than the location task in both tool- and hand-selective LOTC regions, which closely overlapped. No differences were found in nearby object- and motion-selective control regions. Importantly, these findings were confirmed by a TMS study, which showed that effective TMS over the tool-/hand-selective LOTC region significantly slowed responses for tool action discriminations relative to tool location discriminations, with no such difference during sham TMS. We conclude that left LOTC contributes to the discrimination of tool-associated hand actions.

  17. Left occipitotemporal cortex contributes to the discrimination of tool-associated hand actions: fMRI and TMS evidence.

    Science.gov (United States)

    Perini, Francesca; Caramazza, Alfonso; Peelen, Marius V

    2014-01-01

    Functional neuroimaging studies have implicated the left lateral occipitotemporal cortex (LOTC) in both tool and hand perception but the functional role of this region is not fully known. Here, by using a task manipulation, we tested whether tool-/hand-selective LOTC contributes to the discrimination of tool-associated hand actions. Participants viewed briefly presented pictures of kitchen and garage tools while they performed one of two tasks: in the action task, they judged whether the tool is associated with a hand rotation action (e.g., screwdriver) or a hand squeeze action (e.g., garlic press), while in the location task they judged whether the tool is typically found in the kitchen (e.g., garlic press) or in the garage (e.g., screwdriver). Both tasks were performed on the same stimulus set and were matched for difficulty. Contrasting fMRI responses between these tasks showed stronger activity during the action task than the location task in both tool- and hand-selective LOTC regions, which closely overlapped. No differences were found in nearby object- and motion-selective control regions. Importantly, these findings were confirmed by a TMS study, which showed that effective TMS over the tool-/hand-selective LOTC region significantly slowed responses for tool action discriminations relative to tool location discriminations, with no such difference during sham TMS. We conclude that left LOTC contributes to the discrimination of tool-associated hand actions.

  18. Tools for Assessment of Communication Skills of Hospital Action Teams: A Systematic Review.

    Science.gov (United States)

    Rehim, Shady A; DeMoor, Stephanie; Olmsted, Richard; Dent, Daniel L; Parker-Raley, Jessica

    Hospital action teams comprise interdisciplinary health care providers working simultaneously to treat critically ill patients. Assessments designed to evaluate communication effectiveness or "nontechnical" performance of these teams are essential to minimize medical errors and improve team productivity. Although multiple communication tools are available, the characteristics and psychometric validity of these instruments have yet to be systematically compared. To identify assessments used to evaluate the communication or "nontechnical" performance of hospital action teams and summarize evidence to develop and validate these instruments. A literature search was conducted using MEDLINE/PubMed database to identify original articles related to assessment of communication skills in teams working in acute care medicine not exclusive to emergency room, operating room, prehospital air and ground transport, or code blue/rapid response resuscitations. Ten communication assessment tools were identified. Six tools (60%) were designed to measure communication performance of the whole team, whereas 4 tools (40%) were created to assess individual team member's communication skills. Regardless of the type of analysis, the most commonly assessed behavior domains were Leadership, Teamwork, Communication, and Situation awareness. Only 1 of 16 articles describing a particular communication assessment tool reported all the validation criteria, other authors underreported efforts to validate their instruments. A number of tools designed to measure the communication or "nontechnical" performance of hospital action teams are available. Unfortunately, limited reported validity evidence may hamper the utility of these tools in actual clinical practice until further validation studies are performed. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  19. An action research approach to facilitating the adoption of a foot health assessment tool in India.

    Science.gov (United States)

    Harrison-Blount, Michael; Cullen, Michelle; Nester, Christopher J; Williams, Anita E

    2015-01-01

    India has a diabetes population that is growing and alongside this, the incidence of limb threatening foot problems is increasing. Foot health care provision does not yet meet this demand. In one locality in India, clinicians had an unstructured approach to foot health assessments resulting in poor adoption of evidence based guidelines from the West and a persistence of serious foot complications. There was the perception that existing assessment tools did not take into account the local cultural, organizational and professional needs and there was a lack of ownership of any potential solution to the problem. Therefore, the aim of this work was to facilitate the ownership and development of a foot health assessment tool for use in the Indian context. In order to achieve this an action research approach was chosen. Participants were facilitated through the action and implementation phases of the action research cycle by the researchers. The action phase included generating a list of potential items for inclusion in the tool from a review of the literature to provide an evidence based foundation for the foot health assessment tool. A modified Delphi method was used to further refine the contents of the tool. Members of the Delphi Panel (n = 8) were experts in their field of medicine and experts in delivering health care within services in India. The outcome of the study was the adoption of a locally developed foot health assessment tool (Salford Indian Foot Health Assessment Tool, SIFT). It contains thirteen sections, which reflect the risk factors identified for assessing foot health agreed by the participants to fit the Indian context. The SIFT is supported with evidence based guidelines from the West and a training program was delivered by the researchers in order to support its implementation into clinical practice. An action research approach has facilitated the development and implementation of a locally created and owned foot health assessment tool. This

  20. FUTISTREFFIT : Participatory Action Research: analysis and evaluation of football as a community youth development tool

    OpenAIRE

    Wesseh, Cucu

    2012-01-01

    Wesseh Cucu. Thesis: Futistreffit – analysis and evaluation. Language: English. Content: 53 pages, 2 appendices. Degree: Bachelor of Social Services. Focus: Community Development. Institution: Diaconia University of Applied Sciences, Järvenpää The aim of this research is to examine football as a positive youth development tool for Learning-Integration. It focuses on community youth work and uses action research as the prime method of analysis and evaluation. The subject of researc...

  1. Initial Investigations of Controller Tools and Procedures for Schedule-Based Arrival Operations with Mixed Flight-Deck Interval Management Equipage

    Science.gov (United States)

    Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas

    2012-01-01

    NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.

  2. A Systematic Review of Tools Used to Assess Team Leadership in Health Care Action Teams.

    Science.gov (United States)

    Rosenman, Elizabeth D; Ilgen, Jonathan S; Shandro, Jamie R; Harper, Amy L; Fernandez, Rosemarie

    2015-10-01

    To summarize the characteristics of tools used to assess leadership in health care action (HCA) teams. HCA teams are interdisciplinary teams performing complex, critical tasks under high-pressure conditions. The authors conducted a systematic review of the PubMed/MEDLINE, CINAHL, ERIC, EMBASE, PsycINFO, and Web of Science databases, key journals, and review articles published through March 2012 for English-language articles that applied leadership assessment tools to HCA teams in all specialties. Pairs of reviewers assessed identified articles for inclusion and exclusion criteria and abstracted data on study characteristics, tool characteristics, and validity evidence. Of the 9,913 abstracts screened, 83 studies were included. They described 61 team leadership assessment tools. Forty-nine tools (80%) provided behaviors, skills, or characteristics to define leadership. Forty-four tools (72%) assessed leadership as one component of a larger assessment, 13 tools (21%) identified leadership as the primary focus of the assessment, and 4 (7%) assessed leadership style. Fifty-three studies (64%) assessed leadership at the team level; 29 (35%) did so at the individual level. Assessments of simulated (n = 55) and live (n = 30) patient care events were performed. Validity evidence included content validity (n = 75), internal structure (n = 61), relationship to other variables (n = 44), and response process (n = 15). Leadership assessment tools applied to HCA teams are heterogeneous in content and application. Comparisons between tools are limited by study variability. A systematic approach to team leadership tool development, evaluation, and implementation will strengthen understanding of this important competency.

  3. The Article Idea Chart: A participatory action research tool to aid involvement in dissemination

    Directory of Open Access Journals (Sweden)

    Cheryl Forchuk

    2014-06-01

    Full Text Available Participatory-action research encourages the involvement of all key stakeholders in the research process and is especially well suited to mental health research. Previous literature outlines the importance of engaging stakeholders in the development of research questions and methodologies, but little has been written about ensuring the involvement of all stakeholders (especially non-academic members in dissemination opportunities such as publication development. The Article Idea Chart was developed as a specific methodology for engaging all stakeholders in data analysis and publication development. It has been successfully utilised in a number of studies and is an effective tool for ensuring the dissemination process of participatory-action research results is both inclusive and transparent to all team members, regardless of stakeholder group. Keywords: participatory-action research, mental health, dissemination, community capacity building, publications, authorship

  4. The development of a structured schedule for collecting ICF-CY-based information on disability in school and preschool children: an action research from Italy.

    Science.gov (United States)

    Raggi, Alberto; Meucci, Paolo; Leonardi, Matilde; Barbera, Tiziana; Villano, Annamaria; Caputo, Maria R; Grassi, Alessandra

    2014-03-01

    The aim of this study was to present the development of an instrument to collect disability information in school settings, based on the International Classification of Functioning, Disability and Health, Children and Youth version (ICF-CY): the ICF-PEI Schedule (ICF-CY-based schedule for Individualized Education Plan). Through an action-research process, a group of 14 teachers participated in the definition of a comprehensive list of ICF-CY categories, which were then used in a pilot test: categories relevant in at least 30% of the cases were retained. Teachers also reported the most relevant difficulties they had in using the ICF-CY questionnaires: these were discussed in plenary. On the basis of a pilot test and teachers' difficulties, a set of structured, easy to use and feasible questions for the school context were developed. A total of 118 ICF-CY categories were included in the preliminary list and 67 were retained. The most relevant difficulties in using ICF-CY questionnaires were as follows: obtaining reliable information on bodily impairments; using capacity in activities and participation; using qualifiers in 'borderline situations'; and identifying systems and policies as barriers or facilitators. The ICF-PEI Schedule is composed of 62 items, with a simplified rating scale. Teachers are asked to rate performance, which is directly observed, and to address which environmental factors impact it; thus, environmental factor rating is simplified. The ICF-PEI Schedule was drafted as a feasible instrument for school settings to collect and exploit functioning and disability data. Teachers can fruitfully employ it to assist in the definition of educational objectives and verify them longitudinally.

  5. A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

    Energy Technology Data Exchange (ETDEWEB)

    Mitra, Joydeep [Michigan State Univ., East Lansing, MI (United States); Ben-Idris, Mohammed [University of Nevada, Reno; Faruque, Omar [Florida State Univ., Tallahassee, FL (United States); Backhaus, Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Deb, Sidart [LCG Consulting, Los Altos, CA

    2016-03-30

    This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Development of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization

  6. Using scissors to bisect a line: a perception-action dissociation in complex tool use.

    Science.gov (United States)

    Massen, Cristina; Rieger, Martina; Sülzenbrück, Sandra

    2014-01-01

    Previous research has shown that unilateral visual neglect is improved when patients are required to actively grasp an object at its center, rather than only pointing to its center. A similar dissociation between pointing and grasping responses has been reported for pseudoneglect, a spatial bias toward the left side of space that is normally exhibited by healthy participants. Among other theories, the two-visual-streams hypothesis has been offered as an explanation for these dissociations. According to this hypothesis, highly practiced actions that are performed under easily available visual input (e.g., grasping an object) are controlled by the dorsal stream and can resist perceptual judgment biases. We investigated whether, in pseudoneglect, dissociations between perceptual judgments and motor-manipulative responses occur when participants have to respond with complex tools that are highly practiced but that have been shown to rely on both ventral- and dorsal-stream processing. In a standard line bisection task, participants had to either mark the center of a line with a pencil or cut the line in two halves using a pair of scissors. The results indicated the typical leftward bias (pseudoneglect) in the pencil task, whereas performance was much more accurate in the scissors task. These results show that actions featuring complex tool use can resist perceptual judgment biases, and the findings are discussed with reference to existing accounts of perception-action dissociations.

  7. HORMONOMETER: a tool for discerning transcript signatures of hormone action in the Arabidopsis transcriptome.

    Science.gov (United States)

    Volodarsky, Dina; Leviatan, Noam; Otcheretianski, Andrei; Fluhr, Robert

    2009-08-01

    Plant hormones regulate growth and responses to environmental change. Hormone action ultimately modifies cellular physiological processes and gene activity. To facilitate transcriptome evaluation of novel mutants and environmental responses, there is a need to rapidly assess the possible contribution of hormone action to changes in the levels of gene transcripts. We developed a vector-based algorithm that rapidly compares lists of transcripts yielding correlation values. The application as described here, called HORMONOMETER, was used to analyze hormone-related activity in a transcriptome of Arabidopsis (Arabidopsis thaliana). The veracity of the resultant analysis was established by comparison with cognate and noncognate hormone transcriptomes as well as with mutants and selected plant-environment interactions. The HORMONOMETER accurately predicted correlations between hormone action and biosynthetic mutants for which transcriptome data are available. A high degree of correlation was detected between many hormones, particularly at early time points of hormone action. Unforeseen complexity was detected in the analysis of mutants and in plant-herbivore interactions. The HORMONOMETER provides a diagnostic tool for evaluating the physiological state of being of the plant from the point of view of transcripts regulated by hormones and yields biological insight into the multiple response components that enable plant adaptation to the environment. A Web-based interface has been developed to facilitate external interfacing with this platform.

  8. Soundscape actions: A tool for noise treatment based on three workshops in landscape architecture

    Directory of Open Access Journals (Sweden)

    Gunnar Cerwén

    2017-12-01

    Full Text Available This paper reports experiences from three workshops dealing with soundscape as a noise treatment approach in landscape architecture. The workshops were conducted between 2012 and 2016 in different contexts, for different purposes and with different participants. The paper describes the workshop approach employed and analyzes the proposals made by workshop participants to employ “soundscape action” as an operational tool in landscape architecture projects. Through a process of ‘keywording’ and clustering proposals from the workshops, 22 pragmatic soundscape actions emerged and are described on a general level. The paper then discusses the outcomes and experiences from the workshops and relates this to landscape architecture practice.

  9. Upgrade human-machine interface, provide additional analysis tool, and upgrade and migrate scheduling CPCI in existing major computing system

    OpenAIRE

    Andrex, D. L.

    1996-01-01

    This project was inspired by an ENG 5004 session that explored how humans process information coupled with a complaint in my workplace about how difficult it was to analyze our management data. The workplace problem lay in the technology in use: character based terminals presenting data in tabular format regarding schedule data for work on maps. This data tends to be graphically and geographically related. and more easily processed visually as symbols by humans. The challenge in this proje...

  10. LASSOing the MUSTANG: Using Tools Developed by IRIS for Actionable Seismic Data Quality Assessment

    Science.gov (United States)

    Frassetto, A.; Sumy, D. F.; Casey, R. E.; Woodward, R.; Ahern, T. K.

    2016-12-01

    MUSTANG, short for Modular Utility for STAtistical kNowledge Gathering, is a system developed by IRIS Data Services to bring data quality analysis web services to the IRIS DMC, covering the entirety of the data archive from past to present time. It provides station operators and earth scientists ready access to measurements that are scientifically useful and reflect the state of instrumentation that record seismic data. LASSO (Latest Assessment of Seismic Station Observations) is a software client, developed by Instrumental Software Technologies Inc. in conjunction with IRIS Instrumentation Services, which allows the viewer to download, display, sort, and analyze values of different metrics from MUSTANG. LASSO runs within a web-browser, allowing its user to interactively select from a number of preset metric groupings, or develop a more customized query. For many networks archiving data with the DMC, MUSTANG metrics are now available within days, making LASSO an ideal tool for assessing network status. Here, we demonstrate the features of LASSO and how Instrumentation Services commonly uses both LASSO and MUSTANG directly to provide actionable reports and visualizations of data quality. We also highlight the Mustang Data Browser, a tool for the simplified, rapid display of MUSTANG metrics developed by Data Services. Those interested in learning more about LASSO (lasso.iris.edu), MUSTANG (http://service.iris.edu/mustang/), and the Data Browser (https://ds.iris.edu/mustang/databrowser/) are encouraged to use these tools and visit our presentation.

  11. Action-Research and Food and Nutrition Security: A School Experience Mediated by Conceptual Graphic Representation Tool

    Science.gov (United States)

    Graebner, Ivete Teresinha; de Souza, Elizabeth Maria Tala; Saito, Carlos Hiroo

    2009-01-01

    This study deals with the development of a graphic representation tool as a way to support educational planning in an elementary school in the rural area of Brasilia (Brazil's capital), aiming at the implementation of an integrated action-research project focusing on hunger and nutrition. The graphic tool made it possible to promote…

  12. From action to language: comparative perspectives on primate tool use, gesture and the evolution of human language

    Science.gov (United States)

    Steele, James; Ferrari, Pier Francesco; Fogassi, Leonardo

    2012-01-01

    The papers in this Special Issue examine tool use and manual gestures in primates as a window on the evolution of the human capacity for language. Neurophysiological research has supported the hypothesis of a close association between some aspects of human action organization and of language representation, in both phonology and semantics. Tool use provides an excellent experimental context to investigate analogies between action organization and linguistic syntax. Contributors report and contextualize experimental evidence from monkeys, great apes, humans and fossil hominins, and consider the nature and the extent of overlaps between the neural representations of tool use, manual gestures and linguistic processes. PMID:22106422

  13. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  14. Isothermal microcalorimetry, a new tool to monitor drug action against Trypanosoma brucei and Plasmodium falciparum.

    Directory of Open Access Journals (Sweden)

    Tanja Wenzler

    Full Text Available Isothermal microcalorimetry is an established tool to measure heat flow of physical, chemical or biological processes. The metabolism of viable cells produces heat, and if sufficient cells are present, their heat production can be assessed by this method. In this study, we investigated the heat flow of two medically important protozoans, Trypanosoma brucei rhodesiense and Plasmodium falciparum. Heat flow signals obtained for these pathogens allowed us to monitor parasite growth on a real-time basis as the signals correlated with the number of viable cells. To showcase the potential of microcalorimetry for measuring drug action on pathogenic organisms, we tested the method with three antitrypanosomal drugs, melarsoprol, suramin and pentamidine and three antiplasmodial drugs, chloroquine, artemether and dihydroartemisinin, each at two concentrations on the respective parasite. With the real time measurement, inhibition was observed immediately by a reduced heat flow compared to that in untreated control samples. The onset of drug action, the degree of inhibition and the time to death of the parasite culture could conveniently be monitored over several days. Microcalorimetry is a valuable element to be added to the toolbox for drug discovery for protozoal diseases such as human African trypanosomiasis and malaria. The method could probably be adapted to other protozoan parasites, especially those growing extracellularly.

  15. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    Science.gov (United States)

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  16. Burst analysis tool for developing neuronal networks exhibiting highly varying action potential dynamics.

    Science.gov (United States)

    Kapucu, Fikret E; Tanskanen, Jarno M A; Mikkonen, Jarno E; Ylä-Outinen, Laura; Narkilahti, Susanna; Hyttinen, Jari A K

    2012-01-01

    In this paper we propose a firing statistics based neuronal network burst detection algorithm for neuronal networks exhibiting highly variable action potential dynamics. Electrical activity of neuronal networks is generally analyzed by the occurrences of spikes and bursts both in time and space. Commonly accepted analysis tools employ burst detection algorithms based on predefined criteria. However, maturing neuronal networks, such as those originating from human embryonic stem cells (hESCs), exhibit highly variable network structure and time-varying dynamics. To explore the developing burst/spike activities of such networks, we propose a burst detection algorithm which utilizes the firing statistics based on interspike interval (ISI) histograms. Moreover, the algorithm calculates ISI thresholds for burst spikes as well as for pre-burst spikes and burst tails by evaluating the cumulative moving average (CMA) and skewness of the ISI histogram. Because of the adaptive nature of the proposed algorithm, its analysis power is not limited by the type of neuronal cell network at hand. We demonstrate the functionality of our algorithm with two different types of microelectrode array (MEA) data recorded from spontaneously active hESC-derived neuronal cell networks. The same data was also analyzed by two commonly employed burst detection algorithms and the differences in burst detection results are illustrated. The results demonstrate that our method is both adaptive to the firing statistics of the network and yields successful burst detection from the data. In conclusion, the proposed method is a potential tool for analyzing of hESC-derived neuronal cell networks and thus can be utilized in studies aiming to understand the development and functioning of human neuronal networks and as an analysis tool for in vitro drug screening and neurotoxicity assays.

  17. Burst analysis tool for developing neuronal networks exhibiting highly varying action potential dynamics

    Directory of Open Access Journals (Sweden)

    Fikret Emre eKapucu

    2012-06-01

    Full Text Available In this paper we propose a firing statistics based neuronal network burst detection algorithm for neuronal networks exhibiting highly variable action potential dynamics. Electrical activity of neuronal networks is generally analyzed by the occurrences of spikes and bursts both in time and space. Commonly accepted analysis tools employ burst detection algorithms based on predefined criteria. However, maturing neuronal networks, such as those originating from human embryonic stem cells (hESC, exhibit highly variable network structure and time-varying dynamics. To explore the developing burst/spike activities of such networks, we propose a burst detection algorithm which utilizes the firing statistics based on interspike interval (ISI histograms. Moreover, the algorithm calculates interspike interval thresholds for burst spikes as well as for pre-burst spikes and burst tails by evaluating the cumulative moving average and skewness of the ISI histogram. Because of the adaptive nature of the proposed algorithm, its analysis power is not limited by the type of neuronal cell network at hand. We demonstrate the functionality of our algorithm with two different types of microelectrode array (MEA data recorded from spontaneously active hESC-derived neuronal cell networks. The same data was also analyzed by two commonly employed burst detection algorithms and the differences in burst detection results are illustrated. The results demonstrate that our method is both adaptive to the firing statistics of the network and yields successful burst detection from the data. In conclusion, the proposed method is a potential tool for analyzing of hESC-derived neuronal cell networks and thus can be utilized in studies aiming to understand the development and functioning of human neuronal networks and as an analysis tool for in vitro drug screening and neurotoxicity assays.

  18. Solving scheduling problems by untimed model checking. The clinical chemical analyser case study

    NARCIS (Netherlands)

    Margaria, T.; Wijs, Anton J.; Massink, M.; van de Pol, Jan Cornelis; Bortnik, Elena M.

    2009-01-01

    In this article, we show how scheduling problems can be modelled in untimed process algebra, by using special tick actions. A minimal-cost trace leading to a particular action, is one that minimises the number of tick steps. As a result, we can use any (timed or untimed) model checking tool to find

  19. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    Science.gov (United States)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  20. Action Observation and Motor Imagery: Innovative Cognitive Tools in the Rehabilitation of Parkinson’s Disease

    Directory of Open Access Journals (Sweden)

    Giovanni Abbruzzese

    2015-01-01

    Full Text Available Parkinson’s disease (PD is characterized by a progressive impairment of motor skills with deterioration of autonomy in daily living activities. Physiotherapy is regarded as an adjuvant to pharmacological and neurosurgical treatment and may provide small and short-lasting clinical benefits in PD patients. However, the development of innovative rehabilitation approaches with greater long-term efficacy is a major unmet need. Motor imagery (MI and action observation (AO have been recently proposed as a promising rehabilitation tool. MI is the ability to imagine a movement without actual performance (or muscle activation. The same cortical-subcortical network active during motor execution is engaged in MI. The physiological basis of AO is represented by the activation of the “mirror neuron system.” Both MI and AO are involved in motor learning and can induce improvements of motor performance, possibly mediated by the development of plastic changes in the motor cortex. The review of available evidences indicated that MI ability and AO feasibility are substantially preserved in PD subjects. A few preliminary studies suggested the possibility of using MI and AO as parts of rehabilitation protocols for PD patients.

  1. TENCompetence tools and I*Teach methodology in action: development of an active web-based teachers’ community

    NARCIS (Netherlands)

    Nikolova, Nikolina; Stefanov, Krassen; Todorova, Cornelia; Stefanova, Eliza; Ilieva, Miroslava; Sligte, Henk; Hernández-Leo, Davinia

    2009-01-01

    Nikolova, N., Stefanov, K., Todorova, K., Stefanova, E., Ilieva, M., Sligte, H., & Hernández-Leo, D. (2010). TENCompetence tools and I*Teach methodology in action: development of an active web-based teachers’ community. In D. Griffiths, & R. Koper (Eds.), Rethinking Learning and Employment at a

  2. Action Research: A Tool for Improving Teacher Quality and Classroom Practice

    Science.gov (United States)

    O'Connor, Katherine A.; Greene, H. Carol; Anderson, Patricia J.

    2006-01-01

    Background: Action research is a meaningful form of research because it is conducted by the teacher in his or her own classroom. Action research requires a teacher to design a study in an area of interest and conduct it in their own classroom. Action research is a requirement for some masters of education programs in the United States. Purpose: To…

  3. Navigating knowledge to action: a conceptual map for facilitating translation of population health risk planning tools into practice.

    Science.gov (United States)

    Peirson, Leslea; Rosella, Laura

    2015-01-01

    A population health risk tool was created that estimates future diabetes risk and provides outputs that can inform practical and meaningful diabetes prevention strategies and support local decision making and planning. A project was designed to inform and understand knowledge translation and application of this novel tool in multiple health-related settings. Lacking published studies in this area, the authors conceived a conceptual map to guide the project that integrates and adapts elements from several planned action theories. This paper describes the rationale and basis for constructing the Population Health Planning Knowledge-to-Action Model and elaborates on the 2 connected structures of the framework: the Tool Creation Path and the Action Cycle. Although created for an express purpose, this model has the potential to inform application of other tools. This work demonstrates how a research team can adapt and integrate existing frameworks to better align with novel real-world knowledge translation issues. Furthermore, the integration of a population risk tool to support health decision making highlights the interaction between continuing education and knowledge translation. © 2015 The Alliance for Continuing Education in the Health Professions, the Society for Academic Continuing Medical Education, and the Council on Continuing Medical Education, Association for Hospital Medical Education.

  4. The Distraction in Action Tool©: Feasibility and Usability in Clinical Settings.

    Science.gov (United States)

    Hanrahan, Kirsten; Kleiber, Charmaine; Miller, Ben J; Davis, Heather; McCarthy, Ann Marie

    2017-11-10

    Distraction is a relatively simple, evidence-based intervention to minimize child distress during medical procedures. Timely on-site interventions that instruct parents on distraction coaching are needed. The purpose of this study was to test the feasibility and usability of the Distraction in Action Tool© (DAT©), which 1) predicts child risk for distress with a needle stick and 2) provides individualized instructions for parents on how to be a distraction coach for their child in clinical settings. A mixed-methods descriptive design was used to test feasibility and usability of DAT in the Emergency Department and a Phlebotomy Lab at a large Midwest Academic Medical Center. Twenty parents of children ages 4-10years requiring venipuncture and clinicians performing 13 of those procedures participated. Participants completed an evaluation and participated in a brief interview. The average age of the children was 6.8years, and 80% of parent participants were mothers. Most parents reported the DAT was not difficult to use (84.2%), understandable (100%), and they had a positive experience (89.5%). Clinicians thought DAT was helpful (100%) and did not cause a meaningful delay in workflow (92%). DAT can be used by parents and clinicians to assess their children's risk for procedure related distress and learn distraction techniques to help their children during needle stick procedures. DAT for parents is being disseminated via social media and an open-access website. Further research is needed to disseminate and implement DAT in community healthcare settings. Copyright © 2017. Published by Elsevier Inc.

  5. IsoBED: a tool for automatic calculation of biologically equivalent fractionation schedules in radiotherapy using IMRT with a simultaneous integrated boost (SIB technique

    Directory of Open Access Journals (Sweden)

    Benassi Marcello

    2011-05-01

    Full Text Available Abstract Background An advantage of the Intensity Modulated Radiotherapy (IMRT technique is the feasibility to deliver different therapeutic dose levels to PTVs in a single treatment session using the Simultaneous Integrated Boost (SIB technique. The paper aims to describe an automated tool to calculate the dose to be delivered with the SIB-IMRT technique in different anatomical regions that have the same Biological Equivalent Dose (BED, i.e. IsoBED, compared to the standard fractionation. Methods Based on the Linear Quadratic Model (LQM, we developed software that allows treatment schedules, biologically equivalent to standard fractionations, to be calculated. The main radiobiological parameters from literature are included in a database inside the software, which can be updated according to the clinical experience of each Institute. In particular, the BED to each target volume will be computed based on the alpha/beta ratio, total dose and the dose per fraction (generally 2 Gy for a standard fractionation. Then, after selecting the reference target, i.e. the PTV that controls the fractionation, a new total dose and dose per fraction providing the same isoBED will be calculated for each target volume. Results The IsoBED Software developed allows: 1 the calculation of new IsoBED treatment schedules derived from standard prescriptions and based on LQM, 2 the conversion of the dose-volume histograms (DVHs for each Target and OAR to a nominal standard dose at 2Gy per fraction in order to be shown together with the DV-constraints from literature, based on the LQM and radiobiological parameters, and 3 the calculation of Tumor Control Probability (TCP and Normal Tissue Complication Probability (NTCP curve versus the prescribed dose to the reference target.

  6. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    Despite several attempts to accurately predict duration and cost of software projects, initial plans still do not reflect real-life situations. Since commitments with customers are usually decided based on these initial plans, software companies frequently fail to deliver on time and many projects...... overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...

  7. Final Documentation: Incident Management And Probabilities Courses of action Tool (IMPACT).

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, Donna M.; Ray, Jaideep; Tucker, Mark D.; Whetzel, Jonathan; Cauthen, Katherine Regina

    2018-03-01

    This report pulls together the documentation produced for the IMPACT tool, a software-based decision support tool that provides situational awareness, incident characterization, and guidance on public health and environmental response strategies for an unfolding bio-terrorism incident.

  8. Action observation as a tool for neurorehabilitation to moderate motor deficits and aphasia following stroke

    Science.gov (United States)

    Ertelt, Denis; Binkofski, Ferdinand

    2012-01-01

    The mirror neuron system consists of a set of brain areas capable of matching action observation with action execution. One core feature of the mirror neuron system is the activation of motor areas by action observation alone. This unique capacity of the mirror neuron system to match action perception and action execution stimulated the idea that mirror neuron system plays a crucial role in the understanding of the content of observed actions and may participate in procedural learning. These features bear a high potential for neurorehabilitation of motor deficits and of aphasia following stroke. Since the first articles exploring this principle were published, a growing number of follow-up studies have been conducted in the last decade. Though, the combination of action observation with practice of the observed actions seems to constitute the most powerful approach. In the present review, we present the existing studies analyzing the effects of this neurorehabilitative approach in clinical settings especially in the rehabilitation of stroke associated motor deficits and give a perspective on the ongoing trials by our research group. The data obtained up to date showed significant positive effect of action observation on recovery of motor functions of the upper limbs even in the chronic state after stroke, indicating that our approach might become a new standardized add-on feature of modern neurorehabilitative treatment schemes. PMID:25624838

  9. Disability Rights, Gender, and Development: A Resource Tool for Action. Full Report

    Science.gov (United States)

    de Silva de Alwis, Rangita

    2008-01-01

    This resource tool builds a normative framework to examine the intersections of disability rights and gender in the human rights based approach to development. Through case studies, good practices and analyses the research tool makes recommendations and illustrates effective tools for the implementation of gender and disability sensitive laws,…

  10. Action Research: A Tool for Promoting Faculty Development and Continuous Improvement in Leadership Preparation

    Science.gov (United States)

    Carver, Cynthia L.; Klein, C. Suzanne

    2013-01-01

    This paper introduces the use of action research to examine the content and outcomes of university-based leadership preparation programs. Using examples drawn from an ongoing action research project with candidates in a master's level principal preparation program, we demonstrate how the collection and analysis of candidate's written reflections,…

  11. Mirror neurons: action observation treatment as a tool in stroke rehabilitation.

    Science.gov (United States)

    Franceschini, M; Agosti, M; Cantagallo, A; Sale, P; Mancuso, M; Buccino, G

    2010-12-01

    The observation of actions performed by others activate in an observer the same neural structures (including mirror neurons) as when he/she actually performs the same actions. The aim of the present study was to assess whether action observation treatment may improve upper limb motor impairment in chronic stroke patients. This was an observational study. Patients were recruited by three Italian Centres for Neurorehabilitation between 2006 and 2008. Twenty-eight chronic stroke patients with upper limb impairment have undergone for four weeks, five days a week, a rehabilitation treatment based on observation of video-clips presenting hand daily actions, followed by the imitation of those same actions with the affected limb. Functional evaluation by means of Modified Barthel Index (MBI), Frenchay Arm Test (FAT) and Fugl Meyer (FM) was carried out twice before treatment (BT1 and BT2), at an interval of 15 days, then after treatment (AT1) and finally at a two-month follow-up (AT2). Wilcoxon Signed Rank test was applied to test differences between scores obtained from functional scales before and after treatment (BT1 vs. BT2; BT2 vs. AT1; AT1 vs. AT2). In all scales, scores did not differ when comparing BT1 with BT2. Scores improved significantly in all scales at AT1 as compared to BT2 (MBI, P=0.026; FAT, P=0.005; FM, P=0.001). This improvement was still present at the two-month follow-up as testified by no score difference between AT1 and AT2. Action Observation Treatment may become a useful strategy in the rehabilitation of stroke patients. The present preliminary study suggests that stimulation of neural structures (including mirror neurons), activated when the patients actually perform the same actions as those observed could constitute a good alternative rehabilitative approach in chronic stroke patients.

  12. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  13. The Humanitarian Action Qualifications Framework : A Quality Assurance Tool for the Humanitarian Sector

    NARCIS (Netherlands)

    Aardema, Bastiaan; Churruca Muguruza, Cristina

    The article presents the European Universities on Professionalisation on Humanitarian Action (EUPRHA) Project as an initiative that seeks to contribute to the professionalisation and quality assurance of the humanitarian sector. Its purpose is to explain the approach and the process leading to the

  14. Gauging Universities for Sustainability: Action Research as a Tool for Assessing and Influencing Organisational Transformation

    NARCIS (Netherlands)

    Baker-Shelley, Alex

    2016-01-01

    This contribution presents how the novel social scientific methodology of Action Research (AR) can assess campus-driven initiatives to see how to enhance governance for sustainability at Higher Education Institutions (HEI’s). Maastricht University (UM) in particular has a unique form of maintaining

  15. Youth Participatory Action Research and Educational Transformation: The Potential of Intertextuality as a Methodological Tool

    Science.gov (United States)

    Bertrand, Melanie

    2016-01-01

    In this article, Melanie Bertrand explores the potential of using the concept of intertextuality--which captures the way snippets of written or spoken text from one source become incorporated into other sources--in the study and practice of youth participatory action research (YPAR). Though this collective and youth-centered form of research…

  16. Unaware Processing of Tools in the Neural System for Object-Directed Action Representation.

    Science.gov (United States)

    Tettamanti, Marco; Conca, Francesca; Falini, Andrea; Perani, Daniela

    2017-11-01

    The hypothesis that the brain constitutively encodes observed manipulable objects for the actions they afford is still debated. Yet, crucial evidence demonstrating that, even in the absence of perceptual awareness, the mere visual appearance of a manipulable object triggers a visuomotor coding in the action representation system including the premotor cortex, has hitherto not been provided. In this fMRI study, we instantiated reliable unaware visual perception conditions by means of continuous flash suppression, and we tested in 24 healthy human participants (13 females) whether the visuomotor object-directed action representation system that includes left-hemispheric premotor, parietal, and posterior temporal cortices is activated even under subliminal perceptual conditions. We found consistent activation in the target visuomotor cortices, both with and without perceptual awareness, specifically for pictures of manipulable versus non-manipulable objects. By means of a multivariate searchlight analysis, we also found that the brain activation patterns in this visuomotor network enabled the decoding of manipulable versus non-manipulable object picture processing, both with and without awareness. These findings demonstrate the intimate neural coupling between visual perception and motor representation that underlies manipulable object processing: manipulable object stimuli specifically engage the visuomotor object-directed action representation system, in a constitutive manner that is independent from perceptual awareness. This perceptuo-motor coupling endows the brain with an efficient mechanism for monitoring and planning reactions to external stimuli in the absence of awareness. SIGNIFICANCE STATEMENT Our brain constantly encodes the visual information that hits the retina, leading to a stimulus-specific activation of sensory and semantic representations, even for objects that we do not consciously perceive. Do these unconscious representations encompass the motor

  17. Planning for Action: The Impact of an Asthma Action Plan Decision Support Tool Integrated into an Electronic Health Record (EHR) at a Large Health Care System.

    Science.gov (United States)

    Kuhn, Lindsay; Reeves, Kelly; Taylor, Yhenneko; Tapp, Hazel; McWilliams, Andrew; Gunter, Andrew; Cleveland, Jeffrey; Dulin, Michael

    2015-01-01

    Asthma is a chronic airway disease that can be difficult to manage, resulting in poor outcomes and high costs. Asthma action plans assist patients with self-management, but provider compliance with this recommendation is limited in part because of guideline complexity. This project aimed to embed an electronic asthma action plan decision support tool (eAAP) into the medical record to streamline evidence-based guidelines for providers at the point of care, create individualized patient handouts, and evaluate effects on disease outcomes. eAAP development occurred in 4 phases: web-based prototype creation, multidisciplinary team engagement, pilot, and system-wide dissemination. Medical record and hospital billing data compared frequencies of asthma exacerbations before and after eAAP receipt with matched controls. Between December 2012 and September 2014, 5174 patients with asthma (∼10%) received eAAPs. Results showed an association between eAAP receipt and significant reductions in pediatric asthma exacerbations, including 33% lower odds of requiring oral steroids (P management plays an important role in reducing asthma exacerbations. We show the feasibility of leveraging technology to provide guideline-based decision support through an eAAP, addressing known challenges of implementation into routine practice. © Copyright 2015 by the American Board of Family Medicine.

  18. HORMONOMETER: A Tool for Discerning Transcript Signatures of Hormone Action in the Arabidopsis Transcriptome1[W][OA

    Science.gov (United States)

    Volodarsky, Dina; Leviatan, Noam; Otcheretianski, Andrei; Fluhr, Robert

    2009-01-01

    Plant hormones regulate growth and responses to environmental change. Hormone action ultimately modifies cellular physiological processes and gene activity. To facilitate transcriptome evaluation of novel mutants and environmental responses, there is a need to rapidly assess the possible contribution of hormone action to changes in the levels of gene transcripts. We developed a vector-based algorithm that rapidly compares lists of transcripts yielding correlation values. The application as described here, called HORMONOMETER, was used to analyze hormone-related activity in a transcriptome of Arabidopsis (Arabidopsis thaliana). The veracity of the resultant analysis was established by comparison with cognate and noncognate hormone transcriptomes as well as with mutants and selected plant-environment interactions. The HORMONOMETER accurately predicted correlations between hormone action and biosynthetic mutants for which transcriptome data are available. A high degree of correlation was detected between many hormones, particularly at early time points of hormone action. Unforeseen complexity was detected in the analysis of mutants and in plant-herbivore interactions. The HORMONOMETER provides a diagnostic tool for evaluating the physiological state of being of the plant from the point of view of transcripts regulated by hormones and yields biological insight into the multiple response components that enable plant adaptation to the environment. A Web-based interface has been developed to facilitate external interfacing with this platform. PMID:19535475

  19. College Students Understanding of Production Management and Master Production Schedule through Using a Real World Tool, Complimented with Company Tours and In- Class Visits, Provides an Excellent Learning Experience at Farmingdale State College

    Directory of Open Access Journals (Sweden)

    Jill Anne O'Sullivan

    2015-08-01

    Full Text Available Manufacturing is playing a significant role in its re-shoring into America. Companies are grappling with ways to obtain that competitive advantage by distinguishing themselves through their intellectual capabilities, process improvements, technology, people, shop floor management and information flows. The purpose of this paper is to describe the effort at Farmingdale State College to educate our students in understanding Production Management and Master Production Schedule (MPS. We are trying to prepare students for entry into the workforce. By using a Real world ERP tool in the classroom while complimenting this learning with touring local manufacturers who use this tool and having production control experts in our classrooms. [1] The opportunity presents itself for these students to visit real world manufacturers using the same tool these students use in the classroom, the Infor Visual ERP. Each semester students go to a local manufacturer to see how the product is made and the ERP system is used to make it. Each semester a subject matter expert, SME, in manufacturing comes into the class and talks about how they use their ERP to perform their functional responsibilities. Students go into these companies and sit down with these Production Manufacturing and IT SME's to see how they use the modules in their ERP system from estimating, Production Management, MPS to delivery and payment. From the manufacturing window to the Master Schedule Window students learn from these companies SME's just how they perform their functions, how they use this tool. Then that is replicated this in the classroom lab assignments for students to better understand Production Management, scheduling and work order integrity. They identify the desired schedule (forecast and populate a Master Production Schedule. They create a BOM with work orders adding operations and material. The Production Management/Control is the function of directing or regulating the movement of

  20. Integral Action: Management Tool for Municipal Governments Centralized by the National Policy of Territorial Consolidation and Reconstruction

    Directory of Open Access Journals (Sweden)

    Orlando Antonio Mejía Quintero

    2015-01-01

    Full Text Available Integral action has been a key tool for social development, regarding the achievements of the national government to recover legitimacy and governability. Since its beginning in 2002 and up to date, the consolidation process—represented in the National Policy of Territorial Consolidation and Reconstruction (NPTCR— has presented changes in its strategy, in line with current circumstances. This article is theoretically based on the concepts of legitimacy and governability and on the doctrine of integral action of the Armed Forces, complemented with the experience of officers who worked on this strategy or currently run it. Thus, this study offers recommendations to the national government for decision making in modifying the development of NPTCR, taking into account the current historical moment.

  1. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  2. Development of a Tool to Evaluate Lecturers' Verbal Repertoire in Action

    Science.gov (United States)

    van der Rijst, R. M.; Visser-Wijnveen, G. J.; Verloop, N.; van Driel, J. H.

    2014-01-01

    A broad communicative repertoire can help university lecturers to motivate and engage diverse student populations. The aim of this study is to develop and explore the usefulness and validity of a tool to identify patterns in lecturers' verbal repertoire. Speech act theory is presented as a framework to study lecturers' verbal…

  3. Action Research on a WebQuest as an Instructional Tool for Writing Abstracts of Research Articles

    Directory of Open Access Journals (Sweden)

    Krismiyati Latuperissa

    2012-08-01

    Full Text Available The massive growth of and access to information technology (IT has enabled the integration of technology into classrooms. One such integration is the use of WebQuests as an instructional tool in teaching targeted learning activities such as writing abstracts of research articles in English for English as a Foreign Language (EFL learners. In the academic world, writing an abstract of a research paper or final project in English can be challenging for EFL students. This article presents an action research project on the process and outcomes of using a WebQuest designed to help 20 Indonesian university IT students write a research article’s abstract in English. Findings reveal that despite positive feedback, changes need to be made to make the WebQuest a more effective instructional tool for the purpose it was designed.

  4. Actions and tools for the conservation and valorisation of rural architecture and landscape

    Directory of Open Access Journals (Sweden)

    Daniela Bosia

    2014-05-01

    Full Text Available The valorisation of the traditional architecture is a key strategy to improve the economic development of rural areas. The activities of some G.A.L. (Local Action Group of Piedmont Region included the creation of guides focused on the refurbishment of the rural architecture, improving also the energy efficiency of buildings. The paper describes the targets, the methodology and the main results concerning the adoption of the guides and outline a monitoring project, aimed to assess strengths, weakness and opportunities, in order to improve the overall effectiveness of the measures and investments.

  5. Education as a tool for addressing the extinction crisis: moving students from understanding to action.

    Science.gov (United States)

    Moyer-Horner, Lucas; Kirby, Rebecca; Vaughan, Christopher

    2010-12-01

    Human activity is leading to mass species extinctions worldwide. Conservation biology (CB) courses, taught worldwide at universities, typically focus on the proximal causes of extinction without teaching students how to respond to this crisis. The Extinction of Species 360 course has been taught yearly each fall semester to several hundred students at the University of Wisconsin-Madison for over two decades. In 2007 the instructor and five teaching assistants combined principles driving extinctions, based on traditional lectures and discussion sections, with action-oriented education targeting individual consumer habits, to a group of 285 students. Students learn the science underpinning conservation efforts, as evidenced by highly significant learning (extinction crisis and c) facilitated activities to reduce our impact and help alleviate the crisis. The results suggested students learned CB concepts and understood biodiversity's value, increased their awareness of the connection between personal consumption and extinction, and reduced their collective ecological footprints. Furthermore, students complemented their learning and multiplied the potential for consumption reduction, by participating in action-based activities. Such academic courses can provide a rigorous treatment of the direct and indirect causes of extinction while developing a student's sense of personal empowerment to help slow the extinction crisis.

  6. To widen the action tools against the climatic change by domestic projects. Evaluation report

    International Nuclear Information System (INIS)

    Arnaud, E.; Dominicis, A. de; Leguet, B.; Leseur, A.; Perthuis, Ch. de

    2005-11-01

    In the framework of the climatic change fight, each country aims to implement tools of emissions reduction. In France, the european system of CO 2 quotas exchange, applied on the more emitted installations, covers less than 30% of the national carbon emissions. The other 70% are free of taxes. The 'climate mission' realized an evaluation of the emission reduction in the case of a new policy aiming to develop domestic projects of emission control. This report presents the study and its conclusions: the domestic projects, the possibilities of these projects in the transportation agriculture and forests and building sectors, the implementing conditions

  7. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    led several cost research initiatives in cloud computing, service-oriented architecture, and agile development and various independent schedule...and he supports DoD and federal acquisition efforts with a focus on rapid and agile practices to speed solutions with the lowest practical program...assessment, and risk management to control cost and deliver on time. A Government Accountability Office (GAO) assessment of 86 programs that made up the

  8. Education as a tool for addressing the extinction crisis: Moving students from understanding to action

    Directory of Open Access Journals (Sweden)

    Lucas Moyer-Horner

    2010-12-01

    Full Text Available Human activity is leading to mass species extinctions worldwide. Conservation biology (CB courses, taught worldwide at universities, typically focus on the proximal causes of extinction without teaching students how to respond to this crisis. The Extinction of Species 360 course has been taught yearly each fall semester to several hundred students at the University of Wisconsin-Madison for over two decades. In 2007 the instructor and five teaching assistants combined principles driving extinctions, based on traditional lectures and discussion sections, with action-oriented education targeting individual consumer habits, to a group of 285 students. Students learn the science underpinning conservation efforts, as evidenced by highly significant learning (<.001 gains in a 22 question survey in every measured category, and also make direct and immediate changes in their lifestyle and consumption habits. This course succeeded in each of its three primary goals: a informed students about the value of and threats to biodiversity, similar to traditional CB courses, b emphasized our personal role (as consumers in perpetuating the extinction crisis and c facilitated activities to reduce our impact and help alleviate the crisis. The results suggested students learned CB concepts and understood biodiversity’s value, increased their awareness of the connection between personal consumption and extinction, and reduced their collective ecological footprints. Furthermore, students complemented their learning and multiplied the potential for consumption reduction, by participating in action-based activities. Such academic courses can provide a rigorous treatment of the direct and indirect causes of extinction while developing a student’s sense of personal empowerment to help slow the extinction crisis. Rev. Biol. Trop. 58 (4: 1115-1126. Epub 2010 December 01.

  9. Territory and energy: policies, scales and tools for mobilization, knowledge and local action

    International Nuclear Information System (INIS)

    Chanard, Camille

    2011-01-01

    The thesis is about French local authorities' energy policies, and more particularly about regional policies. In a context of reassessment of fossil fuel-based energy systems, local authorities have a key role to play. Indeed, energy systems are complex and require to act locally, in order to keep fair access for consumers and to adapt supply to needs and uses. In the same way, environmental constraints and sustainable exploitation of local resources involve to have a good knowledge of territory and of local energy potential. But, local authorities do not know much about boundaries and about components of territorial energy systems. The main purpose of the thesis is to determine structure and behaviour of these energy systems in order to identify public policy incentive levers at local scale. The first part of the thesis deals with the links between land uses, actors' behaviours, political choices and energy consumptions. Here, we point out the specific interest of geography and territorial approach to treat energy issue, both for land planning and for actors' mobilization. In the second part, we identify policy instruments which local authorities should dispose and actions they should implement in order to develop energy saving and renewables. Then, the third part is more specific to regional level. The analysis of two French planning instruments (Regional Plans for Climate, Air and Energy and Regional Energy Observatories), shows the interest of this scale which could, with its position between national and local levels, contribute to improve knowledge of territories, to coordinate local actions and to develop energy policies adapted to local specificities [fr

  10. A Decision Making Tool for a Comprehensive Evaluation of Building Retrofitting Actions at the Regional Scale

    Directory of Open Access Journals (Sweden)

    Rossano Albatici

    2016-09-01

    Full Text Available Buildings in Europe account for 40% of total primary energy consumption and 36% of CO2 emissions. Nearly one-half of the building stock was built before modern energy efficiency standards and need urgent renovation. Urban retrofitting has emerged as a crucial factor for bringing about a radical change, the new construction rate being lower than 1%. Nevertheless, an accepted and consolidated methodology for refurbishing the existing housing stock is still lacking. The study presents an operating methodology for the optimization of the retrofitting process, based on energy efficiency and cost-effectiveness, as well as users’ comfort, in the building asset of ITEA SpA, the social housing institute for the Province of Trento (Italy, which manages more than 600 buildings. The research consists of the following stages: (1 definition of building classes, similar in age, dimension, typology, construction system and location; (2 analysis of plant systems and recognition of cases significant for classifying buildings in term of energy class; (3 identification of possible improvements and related cost-benefits; and (4 extension of the results to the whole building class. A tool is here proposed, intended for use by ITEA in order to set medium- and long-term plans. The tool does not consider only the effective sustainability of the controlling body intervention but also the final users’ full satisfaction.

  11. The global hidden hunger indices and maps: an advocacy tool for action.

    Science.gov (United States)

    Muthayya, Sumithra; Rah, Jee Hyun; Sugimoto, Jonathan D; Roos, Franz F; Kraemer, Klaus; Black, Robert E

    2013-01-01

    The unified global efforts to mitigate the high burden of vitamin and mineral deficiency, known as hidden hunger, in populations around the world are crucial to the achievement of most of the Millennium Development Goals (MDGs). We developed indices and maps of global hidden hunger to help prioritize program assistance, and to serve as an evidence-based global advocacy tool. Two types of hidden hunger indices and maps were created based on i) national prevalence data on stunting, anemia due to iron deficiency, and low serum retinol levels among preschool-aged children in 149 countries; and ii) estimates of Disability Adjusted Life Years (DALYs) attributed to micronutrient deficiencies in 136 countries. A number of countries in sub-Saharan Africa, as well as India and Afghanistan, had an alarmingly high level of hidden hunger, with stunting, iron deficiency anemia, and vitamin A deficiency all being highly prevalent. The total DALY rates per 100,000 population, attributed to micronutrient deficiencies, were generally the highest in sub-Saharan African countries. In 36 countries, home to 90% of the world's stunted children, deficiencies of micronutrients were responsible for 1.5-12% of the total DALYs. The pattern and magnitude of iodine deficiency did not conform to that of other micronutrients. The greatest proportions of children with iodine deficiency were in the Eastern Mediterranean (46.6%), European (44.2%), and African (40.4%) regions. The current indices and maps provide crucial data to optimize the prioritization of program assistance addressing global multiple micronutrient deficiencies. Moreover, the indices and maps serve as a useful advocacy tool in the call for increased commitments to scale up effective nutrition interventions.

  12. The Global Hidden Hunger Indices and Maps: An Advocacy Tool for Action

    Science.gov (United States)

    Muthayya, Sumithra; Rah, Jee Hyun; Sugimoto, Jonathan D.; Roos, Franz F.; Kraemer, Klaus; Black, Robert E.

    2013-01-01

    The unified global efforts to mitigate the high burden of vitamin and mineral deficiency, known as hidden hunger, in populations around the world are crucial to the achievement of most of the Millennium Development Goals (MDGs). We developed indices and maps of global hidden hunger to help prioritize program assistance, and to serve as an evidence-based global advocacy tool. Two types of hidden hunger indices and maps were created based on i) national prevalence data on stunting, anemia due to iron deficiency, and low serum retinol levels among preschool-aged children in 149 countries; and ii) estimates of Disability Adjusted Life Years (DALYs) attributed to micronutrient deficiencies in 136 countries. A number of countries in sub-Saharan Africa, as well as India and Afghanistan, had an alarmingly high level of hidden hunger, with stunting, iron deficiency anemia, and vitamin A deficiency all being highly prevalent. The total DALY rates per 100,000 population, attributed to micronutrient deficiencies, were generally the highest in sub-Saharan African countries. In 36 countries, home to 90% of the world’s stunted children, deficiencies of micronutrients were responsible for 1.5-12% of the total DALYs. The pattern and magnitude of iodine deficiency did not conform to that of other micronutrients. The greatest proportions of children with iodine deficiency were in the Eastern Mediterranean (46.6%), European (44.2%), and African (40.4%) regions. The current indices and maps provide crucial data to optimize the prioritization of program assistance addressing global multiple micronutrient deficiencies. Moreover, the indices and maps serve as a useful advocacy tool in the call for increased commitments to scale up effective nutrition interventions. PMID:23776712

  13. Effecting change through dialogue: Habermas' theory of communicative action as a tool in medical lifestyle interventions.

    Science.gov (United States)

    Walseth, Liv Tveit; Schei, Edvin

    2011-02-01

    Adjustments of everyday life in order to prevent disease or treat illness afflict partly unconscious preferences and cultural expectations that are often difficult to change. How should one, in medical contexts, talk with patients about everyday life in ways that might penetrate this blurred complexity, and help people find goals and make decisions that are both compatible with a good life and possible to accomplish? In this article we pursue the question by discussing how Habermas' theory of communicative action can be implemented in decision-making processes in general practice. The theory of deliberative decision-making offers practical guidelines for what to talk about and how to do it. For a decision to be rooted in patients' everyday life it has to take into consideration the patient's practical circumstances, emotions and preferences, and what he or she perceives as ethically right behaviour towards other people. The aim is a balanced conversation, demonstrating respect, consistency and sincerity, as well as offering information and clarifying reasons. Verbalising reasons for one's preferences may increase awareness of values and norms, which can then be reflected upon, producing decisions rooted in what the patient perceives as good and right behaviour. The asymmetry of medical encounters is both a resource and a challenge, demanding patient-centred medical leadership, characterised by empathy and ability to take the patient's perspective. The implementation and adjustments of Habermas' theory in general practice is illustrated by a case story. Finally, applications of the theory are discussed.

  14. Decision support tool for Virtual Power Players: Hybrid Particle Swarm Optimization applied to Day-ahead Vehicle-To-Grid Scheduling

    DEFF Research Database (Denmark)

    Soares, João; Valle, Zita; Morais, Hugo

    2013-01-01

    of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network...

  15. PECULIAR FEATURES OF MACHINING MARKS FORMATION ON SURFACE ОF TITANIUM SPECIMEN WITH SINGLE ELECTRO CONTACT ACTION OF WIRE ELECTRODE-TOOL

    Directory of Open Access Journals (Sweden)

    M. G. Kiselev

    2013-01-01

    Full Text Available The paper presents an investigation of shape and geometry parameters of machining marks obtained on the surface of titanium specimen with a single electro contact action of a wire electrode-tool. A description of the developed unit and methodology for execution of experimental investigations has been given in the paper. The paper provides and analyzes experimentally obtained data showing the effect of conditions and modes of single electro contact action of wire tool-electrode on the shape and geometrical parameters of machining marks obtained on the surface of titanium specimen. It is shown that the formation of these traces occurs in the context of joint action of both the electrical erosion and mechanical action of the working part of the wire electrode-tool on the surface of the titanium specimen that expands technological capabilities of electro contact treatment while  solving problems associated with targeted modification of the original work-piece surfaces.

  16. Astronaut Office Scheduling System Software

    Science.gov (United States)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  17. Qualitative evaluation of the implementation of the Interdisciplinary Management Tool: a reflective tool to enhance interdisciplinary teamwork using Structured, Facilitated Action Research for Implementation.

    Science.gov (United States)

    Nancarrow, Susan A; Smith, Tony; Ariss, Steven; Enderby, Pamela M

    2015-07-01

    Reflective practice is used increasingly to enhance team functioning and service effectiveness; however, there is little evidence of its use in interdisciplinary teams. This paper presents the qualitative evaluation of the Interdisciplinary Management Tool (IMT), an evidence-based change tool designed to enhance interdisciplinary teamwork through structured team reflection. The IMT incorporates three components: an evidence-based resource guide; a reflective implementation framework based on Structured, Facilitated Action Research for Implementation methodology; and formative and summative evaluation components. The IMT was implemented with intermediate care teams supported by independent facilitators in England. Each intervention lasted 6 months and was evaluated over a 12-month period. Data sources include interviews, a focus group with facilitators, questionnaires completed by team members and documentary feedback from structured team reports. Data were analysed qualitatively using the Framework approach. The IMT was implemented with 10 teams, including 253 staff from more than 10 different disciplines. Team challenges included lack of clear vision; communication issues; limited career progression opportunities; inefficient resource use; need for role clarity and service development. The IMT successfully engaged staff in the change process, and resulted in teams developing creative strategies to address the issues identified. Participants valued dedicated time to focus on the processes of team functioning; however, some were uncomfortable with a focus on teamwork at the expense of delivering direct patient care. The IMT is a relatively low-cost, structured, reflective way to enhance team function. It empowers individuals to understand and value their own, and others' roles and responsibilities within the team; identify barriers to effective teamwork, and develop and implement appropriate solutions to these. To be successful, teams need protected time to take

  18. Education as a tool for addressing the extinction crisis: Moving students from understanding to action

    Directory of Open Access Journals (Sweden)

    Lucas Moyer-Horner

    2010-12-01

    Full Text Available Human activity is leading to mass species extinctions worldwide. Conservation biology (CB courses, taught worldwide at universities, typically focus on the proximal causes of extinction without teaching students how to respond to this crisis. The Extinction of Species 360 course has been taught yearly each fall semester to several hundred students at the University of Wisconsin-Madison for over two decades. In 2007 the instructor and five teaching assistants combined principles driving extinctions, based on traditional lectures and discussion sections, with action-oriented education targeting individual consumer habits, to a group of 285 students. Students learn the science underpinning conservation efforts, as evidenced by highly significant learning (La actividad humana está produciendo grandes extinciones de especies en todo el mundo. Los cursos de biología de la conservación (BC, impartidos en universidades de todo el mundo, por lo general se enfocan en las causas de la extinción, sin enseñar a los estudiantes cómo responder a esta crisis. Durante más de dos décadas, la Universidad de Wisconsin-Madison ha ofrecido el curso Extinción de las Especies (#360, que se ha dado cada año, durante otoño a varios cientos de estudiantes cada vez. En 2007 el instructor y cinco asistentes de enseñanza combinaron los principios de manejo de la extinción, con base en presentaciones tradicionales y una sección de discusión, con educación con acción-orientada a los hábitos individuales de consumo, a un grupo de 285 estudiantes. Ellos aprendieron que la ciencia sustenta los esfuerzos de conservación, como lo demuestra el aprendizaje altamente significativo (P<.001 en una encuesta de 22 preguntas en todas las categorías medidas, y en cambios directos e inmediatos en su estilo de vida y hábitos de consumo. Este curso tuvo éxito en cada uno de sus tres objetivos principales: a los estudiantes fueron informados sobre el valor y las amenazas a

  19. THE NATIONAL RADON ARCHIVE AS A USEFUL TOOL FOR DEVELOPING AND UPDATING THE NATIONAL RADON ACTION PLAN.

    Science.gov (United States)

    Bochicchio, F; Antignani, S; Carpentieri, C; Ampollini, M; Caccia, B; Pozzi, S; Venoso, G

    2017-11-01

    International recommendations and regulations require developing of National Radon Action Plans (NRAPs) to effectively manage the protection of workers and population from radon exposure. In Italy, a NRAP was published in 2002 and several activities have been carried out in this framework. Information and data regarding these and previous activities have been collected in a National Radon Archive (NRA). Activities carried out by institutionally involved institutes and agencies include several national and regional surveys, involving more than 50 000 indoor environments (dwellings, schools and workplaces), and remedial actions performed in ~350 buildings, largely in schools. Data collected in the NRA allowed also to estimate that lung cancer deaths attributable to radon exposure in Italy are ~3400 per year. On-going developments of the Italian NRA finalized to effectively use it as tool for developing, monitoring and updating the NRAP are also described. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  20. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  1. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  2. Assessing participants' perceptions on group-based principles for action in community-based health enhancing physical activity programmes: The APEF tool.

    Science.gov (United States)

    Herens, Marion; Wagemakers, Annemarie

    2017-12-01

    In community-based health enhancing physical activity (CBHEPA) programmes, group-based principles for action such as active participation, enjoyment, and fostering group processes are widely advocated. However, not much is known about participants' perceptions of these principles as there are no assessment tools available. Therefore, this article describes the development of the APEF (Active Participation, Enjoyment, and Fostering group processes) tool and reports on its implementation in a Dutch CBHEPA programme. Indicators for the principles have been identified from literature research, interviews with professionals, and secondary analysis of three group interviews with 11 practitioners. To address the identified indicators, the APEF tool was developed, pretested, and used in 10 focus groups with 76 participants. The APEF tool consists of eight statements about group-based principles for action, on which CBHEPA participants vote, followed by in-depth discussion. The voting procedure engages participants. Spider diagrams visualise participants' perceptions of group-based principles. The APEF tool addresses the challenge of relating group level outcomes to individual outcomes such as physical activity behaviour. The tool facilitates as well as evaluates group-based principles for action, it stimulates dialogue and is culturally sensitive, but it needs strong facilitating skills to manage group dynamics. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  3. Records Control Schedules Repository

    Data.gov (United States)

    National Archives and Records Administration — The Records Control Schedules (RCS) repository provides access to scanned versions of records schedules, or Standard Form 115, Request for Records Disposition...

  4. Roteiro pedagógico: um instrumento para a aprendizagem de conceitos de física Pedagogical Schedule: a tool for learning physics concepts

    Directory of Open Access Journals (Sweden)

    Neiva Irma Jost Manzini

    2007-04-01

    Full Text Available O objetivo desta investigação foi analisar as possibilidades e os limites de uma experiência de ensino-aprendizagem de conteúdos de física, realizada com alunos do curso de Licenciatura em Física e fundamentada na "epistemologia genética" de Jean Piaget. Como metodologia de ensino foi construído o roteiro pedagógico, que tem como objetivo identificar e promover a construção e reconstrução de processos cognitivos sob a perspectiva piagetiana, visando possibilitar a compreensão das grandezas físicas envolvidas nos fenômenos e das relações lógico-matemáticas entre elas. Contatou-se que essa atividade pedagógica auxilia os alunos na construção do conhecimento e na formação da equação matemática que expressa o fenômeno físico estudado.This investigation aims to analyze the possibilities and limits of a teaching-and-learning experience about physics subjects, carried out with students from a Physics Degree and its basis is in the "Genetics Epistemology", of Jean Piaget. As a methodology of teaching, it uses a pedagogical schedule, that aims to identify and promote the construction and reconstruction of cognitive processes using Piaget´s perspective, aiming to make possible the comprehension of the magnitudes in Physics involved in the phenomenon and logical-mathematical relations between them. I noticed that this pedagogical activity helps students in the acquisition of their knowledge and the formation of mathematical equations that expresses the physical phenomenon studied.

  5. Enhancements to highway construction scheduling expert system.

    Science.gov (United States)

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  6. Virtual Reality as a Tool for the Study of Perception-Action : The Case of Running to Catch Fly Balls

    NARCIS (Netherlands)

    Zaal, Frank T. J. M.; Bootsma, Reinoud J.

    Virtual reality (VR) holds great promise for the study of perception-action. The case of studying the outfielder problem is presented as an example of how VR has contributed to our understanding of perception-action, and of the potential and pitfalls of using VR in such a task. The outfielder

  7. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  8. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Ravn, Anders P.

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact ...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way.......Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...

  9. Widening the Schedulability Hierarchical Scheduling Systems

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper presents a compositional approach for schedula- bility analysis of hierarchical systems, which enables to prove more sys- tems schedulable by having richer and more detailed scheduling models. We use a lightweight method (statistical model checking) for design ex- ploration, easily ass...

  10. 76 FR 13665 - Cambridge Tool & Die, Including On-Site Leased Workers From Action Total Staffing, Cambridge, OH...

    Science.gov (United States)

    2011-03-14

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,605] Cambridge Tool & Die... Eligibility To Apply for Worker Adjustment Assistance In accordance with Section 223 of the Trade Act of 1974... of Cambridge Tool & Die, Cambridge, Ohio. The workers are engaged in the production of plastic...

  11. Implementation of structure-mapping inference by event-file binding and action planning: a model of tool-improvisation analogies.

    Science.gov (United States)

    Fields, Chris

    2011-03-01

    Structure-mapping inferences are generally regarded as dependent upon relational concepts that are understood and expressible in language by subjects capable of analogical reasoning. However, tool-improvisation inferences are executed by members of a variety of non-human primate and other species. Tool improvisation requires correctly inferring the motion and force-transfer affordances of an object; hence tool improvisation requires structure mapping driven by relational properties. Observational and experimental evidence can be interpreted to indicate that structure-mapping analogies in tool improvisation are implemented by multi-step manipulation of event files by binding and action-planning mechanisms that act in a language-independent manner. A functional model of language-independent event-file manipulations that implement structure mapping in the tool-improvisation domain is developed. This model provides a mechanism by which motion and force representations commonly employed in tool-improvisation structure mappings may be sufficiently reinforced to be available to inwardly directed attention and hence conceptualization. Predictions and potential experimental tests of this model are outlined.

  12. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  13. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  14. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    Science.gov (United States)

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  15. Action Research, Pedagogy, and Activity Theory: Tools Facilitating Two Instructors' Interpretations of the Professional Development of Four Preservice Teachers

    Science.gov (United States)

    Clarke, Pier A. Junor; Fournillier, Janice B.

    2012-01-01

    This paper explores the value of action research in the understanding of the professional development of 4 preservice secondary school mathematics (PSSM) teachers and their instructors in a teacher education program. It draws upon data collected from multiple cycles in a research project (2007-2010). The goal of the long term project was to…

  16. From vision to action: roadmapping as a strategic method and tool to implement climate change adaptation - the example of the roadmap 'water sensitive urban design 2020'.

    Science.gov (United States)

    Hasse, J U; Weingaertner, D E

    2016-01-01

    As the central product of the BMBF-KLIMZUG-funded Joint Network and Research Project (JNRP) 'dynaklim - Dynamic adaptation of regional planning and development processes to the effects of climate change in the Emscher-Lippe region (North Rhine Westphalia, Germany)', the Roadmap 2020 'Regional Climate Adaptation' has been developed by the various regional stakeholders and institutions containing specific regional scenarios, strategies and adaptation measures applicable throughout the region. This paper presents the method, elements and main results of this regional roadmap process by using the example of the thematic sub-roadmap 'Water Sensitive Urban Design 2020'. With a focus on the process support tool 'KlimaFLEX', one of the main adaptation measures of the WSUD 2020 roadmap, typical challenges for integrated climate change adaptation like scattered knowledge, knowledge gaps and divided responsibilities but also potential solutions and promising chances for urban development and urban water management are discussed. With the roadmap and the related tool, the relevant stakeholders of the Emscher-Lippe region have jointly developed important prerequisites to integrate their knowledge, to clarify vulnerabilities, adaptation goals, responsibilities and interests, and to foresightedly coordinate measures, resources, priorities and schedules for an efficient joint urban planning, well-grounded decision-making in times of continued uncertainties and step-by-step implementation of adaptation measures from now on.

  17. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  18. Trying on and trying out: participatory action research as a tool for literacy and identity work in middle grades classrooms.

    Science.gov (United States)

    Van Sluys, Katie

    2010-09-01

    This article explores the role of collaborative, ethnographic, participatory action research (PAR) with eighth grade students as a set of possible literacy practices for involving students with issues connected to their lives, resources, language(s), and communities. Findings are based on a year of fieldwork conducted as part of shared inquiry into one public school community's experiences with gentrification and meeting the complex needs of diverse learners. Findings bring to life the ways in which PAR facilitates the redefining of reading, writing, and research; the reconsideration of languages; the rethinking of literacy practices; and the repositioning of participants within and beyond given research endeavors.

  19. An Evaluation of New After-Action Review Tools in Exercise Black Skies 10 & Exercise Black Skies 12

    Science.gov (United States)

    2013-10-01

    Wickens, E. (2003) Andragogy and the Socratic method: The adult learner persective. Journal of Hospitality, Leisure , Sport & Tourism Education, 2(2...and rehearsal. The report is divided into two studies , coinciding with the evaluation of the EBS10 and EBS12 versions of AWAR respectively...In Study 1, the EBS10 version of the AWAR tool suite was observed to encourage a more inclusive and discursive AAR, which took account of the factors

  20. Development of a Web-based tool to collect and display water system customer service areas for public health action.

    Science.gov (United States)

    Wong, Michelle; Wolff, Craig; Collins, Natalie; Guo, Liang; Meltzer, Dan; English, Paul

    2015-01-01

    Significant illness is associated with biological contaminants in drinking water, but little is known about health effects from low levels of chemical contamination in drinking water. To examine these effects in epidemiological studies, the sources of drinking water of study populations need to be known. The California Environmental Health Tracking Program developed an online application that would collect data on the geographic location of public water system (PWS) customer service areas in California, which then could be linked to demographic and drinking water quality data. We deployed the Water Boundary Tool (WBT), a Web-based geospatial crowdsourcing application that can manage customer service boundary data for each PWS in California and can track changes over time. We also conducted a needs assessment for expansion to other states. The WBT was designed for water system operators, local and state regulatory agencies, and government entities. Since its public launch in 2012, the WBT has collected service area boundaries for about 2300 individual PWS, serving more than 90% of the California population. Results of the needs assessment suggest interest and utility for deploying such a tool among states lacking statewide PWS service area boundary data. Although the WBT data set is incomplete, it has already been used for a variety of applications, including fulfilling legislatively mandated reporting requirements and linking customer service areas to drinking water quality data to better understand local water quality issues. Development of this tool holds promise to assist with outbreak investigations and prevention, environmental health monitoring, and emergency preparedness and response.

  1. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  2. Prioritizing action on health inequities in cities: An evaluation of Urban Health Equity Assessment and Response Tool (Urban HEART) in 15 cities from Asia and Africa.

    Science.gov (United States)

    Prasad, Amit; Kano, Megumi; Dagg, Kendra Ann-Masako; Mori, Hanako; Senkoro, Hawa Hamisi; Ardakani, Mohammad Assai; Elfeky, Samar; Good, Suvajee; Engelhardt, Katrin; Ross, Alex; Armada, Francisco

    2015-11-01

    Following the recommendations of the Commission on Social Determinants of Health (2008), the World Health Organization (WHO) developed the Urban Health Equity Assessment and Response Tool (HEART) to support local stakeholders in identifying and planning action on health inequities. The objective of this report is to analyze the experiences of cities in implementing Urban HEART in order to inform how the future development of the tool could support local stakeholders better in addressing health inequities. The study method is documentary analysis from independent evaluations and city implementation reports submitted to WHO. Independent evaluations were conducted in 2011-12 on Urban HEART piloting in 15 cities from seven countries in Asia and Africa: Indonesia, Iran, Kenya, Mongolia, Philippines, Sri Lanka, and Vietnam. Local or national health departments led Urban HEART piloting in 12 of the 15 cities. Other stakeholders commonly engaged included the city council, budget and planning departments, education sector, urban planning department, and the Mayor's office. Ten of the 12 core indicators recommended in Urban HEART were collected by at least 10 of the 15 cities. Improving access to safe water and sanitation was a priority equity-oriented intervention in 12 of the 15 cities, while unemployment was addressed in seven cities. Cities who piloted Urban HEART displayed confidence in its potential by sustaining or scaling up its use within their countries. Engagement of a wider group of stakeholders was more likely to lead to actions for improving health equity. Indicators that were collected were more likely to be acted upon. Quality of data for neighbourhoods within cities was one of the major issues. As local governments and stakeholders around the world gain greater control of decisions regarding their health, Urban HEART could prove to be a valuable tool in helping them pursue the goal of health equity. Copyright © 2015. Published by Elsevier Ltd.

  3. Intelligent scheduling support for the US Coast Guard

    Energy Technology Data Exchange (ETDEWEB)

    Darby-Dowman, K.; Lucas, C.; Mitra, G. [Brunel Univ., Uxbridge (United Kingdom); Fink, R. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Kingsley, L.; Smith, J.W. [Coast Guard Research and Development Center, Groton, CT (United States)

    1992-12-31

    This paper will discuss a joint effort by the U.S. Coast Guard Research & Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler`s capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  4. Computeer-based decision support tools for evaluation of actions affecting flow and water quality in the San Joaquin Basin

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, N.W.T.

    1993-01-01

    This document is a preliminary effort to draw together some of the important simulation models that are available to Reclamation or that have been developed by Reclamation since 1987. This document has also attempted to lay out a framework by which these models might be used both for the purposes for which they were originally intended and to support the analysis of other issues that relate to the hydrology and to salt and water quality management within the San Joaquin Valley. To be successful as components of a larger Decision Support System the models should to be linked together using custom designed interfaces that permit data sharing between models and that are easy to use. Several initiatives are currently underway within Reclamation to develop GIS - based and graphics - based decision support systems to improve the general level of understanding of the models currently in use, to standardize the methodology used in making planning and operations studies and to permit improved data analysis, interpretation and display. The decision support systems should allow greater participation in the planning process, allow the analysis of innovative actions that are currently difficult to study with present models and should lead to better integrated and more comprehensive plans and policy decisions in future years.

  5. An informatics-based tool to assist researchers in initiating research at an academic medical center: Vanderbilt Customized Action Plan.

    Science.gov (United States)

    Pulley, Jill M; Harris, Paul A; Yarbrough, Tonya; Swafford, Jonathan; Edwards, Terri; Bernard, Gordon R

    2010-01-01

    The regulatory review and approval process is a significant part of the workflow associated with initiating clinical and translational research projects. Ambiguity concerning submission requirements and expected times associated with the review process can create additional work for research teams and ultimately delay important scientific projects. In an effort to provide assistance to investigators, we have developed an online interactive interface which elicits basic study characteristics for a single project and subsequently produces a list of required administrative applications needed for approval along with clear instructions concerning expectations from the research team. This system, the Vanderbilt Customized Action Plan (V-CAP), was launched in October 2006 and has been well received by researchers. In this article, the authors present (1) the V-CAP project design, (2) a reference workflow associated with Vanderbilt policies and regulations, (3) the V-CAP metrics of use by Vanderbilt research teams, and (4) a list of recommendations for other academic centers considering a similar systems-based approach for helping researchers efficiently navigate processes related to regulatory approval. The informatics-systems-based approach of the V-CAP is scalable to other academic medical centers and may serve as a useful model to help researchers navigate the complexity of the regulatory approvals process.

  6. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  7. 78 FR 37246 - January 2013 Pay Schedules

    Science.gov (United States)

    2013-06-20

    ... incorporated as part of this notice. U.S. Office of Personnel Management. Elaine Kaplan, Acting Director... MANAGEMENT January 2013 Pay Schedules AGENCY: U.S. Office of Personnel Management. ACTION: Notice. SUMMARY... levels. This notice serves as documentation for the public record. FOR FURTHER INFORMATION CONTACT...

  8. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  9. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  10. Using a map-based assesment tool for the development of cost-effective WFD river basin action programmes in a changing climate

    DEFF Research Database (Denmark)

    Kaspersen, Bjarke Stoltze; Vammen Jacobsen, Torsten; Brian Butts, Michael

    2016-01-01

    For the 2nd and 3rd river basin management cycles (2015–2027) of the Water Framework Directive (WFD), EU Member States are required to fully integrate climate change into the process of river basin management planning (RBMP). Complying with the main WFD objective of achieving ‘good ecological......, there is still a need for further reductions. In addition, the impacts of climate change are projected to lead to a situation where nutrient loads will have to be reduced still further in comparison to current climate conditions. There is an urgent need to address this challenge in WFD action programmes in order...... Basin in the north east of Denmark. The tool facilitates assessments of the application of agri-environmental measures that are targeted towards low retention agricultural areas, where limited or no surface and subsurface N reduction takes place. Effects of climate change on nitrate leaching were...

  11. Effects of Block Scheduling

    Directory of Open Access Journals (Sweden)

    William R. Veal

    1999-09-01

    Full Text Available This study examined the effects of a tri-schedule on the academic achievement of students in a high school. The tri-schedule consists of traditional, 4x4 block, and hybrid schedules running at the same time in the same high school. Effectiveness of the schedules was determined from the state mandated test of basic skills in reading, language, and mathematics. Students who were in a particular schedule their freshman year were tested at the beginning of their sophomore year. A statistical ANCOVA test was performed using the schedule types as independent variables and cognitive skill index and GPA as covariates. For reading and language, there was no statistically significant difference in test results. There was a statistical difference mathematics-computation. Block mathematics is an ideal format for obtaining more credits in mathematics, but the block format does little for mathematics achievement and conceptual understanding. The results have content specific implications for schools, administrations, and school boards who are considering block scheduling adoption.

  12. Schedule for Rating Disabilities; the Endocrine System. Final rule.

    Science.gov (United States)

    2017-11-02

    This document amends the Department of Veterans Affairs (VA) Schedule for Rating Disabilities (VASRD) by revising the portion of the Schedule that addresses endocrine conditions and disorders of the endocrine system. The effect of this action is to ensure that the VASRD uses current medical terminology and to provide detailed and updated criteria for evaluation of endocrine disorders.

  13. Airport environmental noise mapping and land use management as an environmental protection action policy tool. The case of the Larnaka International Airport (Cyprus).

    Science.gov (United States)

    Vogiatzis, Konstantinos

    2012-05-01

    The evidence from epidemiological studies on the association between exposure to traffic and aircraft noise and hypertension and ischemic heart disease has increased during the recent years. Both road traffic and aircraft noise increase the risk of high blood pressure. Environmental noise mapping, as per the 2002/49/EC Directive, is an obligation of all European Union (EU) member states. In the framework of the present article a complete Strategic Noise Mapping research and Action Noise Plans assessment and evaluation are presented and aim to access land use management as an effective tool for protection from aircraft noise. The case of the Larnaka International Airport in Cyprus, a typical Mediterranean airport, (considered as a "large airport" according to the above EU Directive and the recent Cyprus Legislation Law No. 224(Ι)/2004), is presented. In this paper a review of both assessment and action implementation procedures focusing on the dominant--in the area--aircraft traffic noise is presented, with emphasis to (a) a full calculation of Strategic Noise Map (SNM) scenarios of actual and future airport operation using the ECAC.CEAC Doc 29 methodology for both EU common indicators L(den) and L(night) in scales of 5 dB, (b) a full evaluation of results with emphasis to the Larnaka greater area land uses and the exposure of inhabitants in residences in various levels of environmental noise, and (c) a full evaluation of Noise Action Plans (NAP) introducing especially a new land use management scheme for the future Larnaka Town Land Use Plan. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  15. Design of a computer program for the registration of implantable medical device, field safety corrective action and advers events, as a tool for medical device surveillance

    Directory of Open Access Journals (Sweden)

    Juan Francisco Márquez-Peiró

    2016-03-01

    Full Text Available Objective: To describe the features of computer program to support the activity of the responsible for surveillance of medical devices. To evaluate their use after one year of implementation in a hospital. Method: The stages of the process were: description of the activities of medical devices surveillance and implant registration, definition of functionality and data processing, creation of databases, implementation in a private hospital which manages PS, validation of the program and analysis of their usefulness. Results: SIVIPS was developed using Acces®. Main variables were described for all the activities of the responsible for medical device surveillance (implants, alert, medical device incidents, including for in vitro diagnostics and all the functionalities of the computer program. SIVIPS was introduced in a pharmacy service with one pharmacist for the management of medical devices. One year after its implementation we had registered 564 implants with a description by type of implant, 31 alerts and 6 incidents. SIVIPS allow monitoring of the actions taken in these cases. Conclusions: SIVIPS® is the first tool to support the activity of medical device surveillance. It is an easy tool that allows the registration of alerts and medical device related incidents, and registration of implants performed in the center, which will improve the traceability of the PS.

  16. [Design of a computer program for the registration of implantable medical device, field safety corrective action and advers events, as a tool for medical device surveillance].

    Science.gov (United States)

    Márquez-Peiró, Juan Francisco; Gaspar-Carreño, Marisa; Jiménez-Torres, José; Selva-Otaolaurruchi, Juan

    2016-03-01

    To describe the features of computer program to support the activity of the responsible for surveillance of medical devices. To evaluate their use after one year of implementation in a hospital. The stages of the process were: description of the activities of medical devices surveillance and implant registration, definition of functionality and data processing, creation of databases, implementation in a private hospital which manages PS, validation of the program and analysis of their usefulness. SIVIPS was developed using Acces. Main variables were described for all the activities of the responsible for medical device surveillance (implants, alert, medical device incidents, including for in vitro diagnostics) and all the functionalities of the computer program. SIVIPS was introduced in a pharmacy service with one pharmacist for the management of medical devices. One year after its implementation we had registered 564 implants with a description by type of implant, 31 alerts and 6 incidents. SIVIPS allow monitoring of the actions taken in these cases. SIVIPS is the first tool to support the activity of medical device surveillance. It is an easy tool that allows the registration of alerts and medical device related incidents, and registration of implants performed in the center, which will improve the traceability of the PS. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  17. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  18. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  19. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  20. Childhood Vaccine Schedule

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  1. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    the predominant scheduling method since it was introduced in the late 1950s. Over the years, CPM has proven to be a very powerful technique for planning, scheduling and controlling projects, which among other things is indicated by the development of a large number of CPM-based software applications available...... on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...

  2. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  3. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  4. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  5. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    Typically, ground staff scheduling is centrally planned for each terminal in an airport. The advantage of this is that the staff is efficiently utilized, but a disadvantage is that staff spends considerable time walking between stands. In this paper a decentralized approach for ground staff...... scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...

  6. Intelligent scheduling support for the US Coast Guard

    Energy Technology Data Exchange (ETDEWEB)

    Darby-Dowman, K.; Lucas, C.; Mitra, G. (Brunel Univ., Uxbridge (United Kingdom)); Fink, R. (Idaho National Engineering Lab., Idaho Falls, ID (United States)); Kingsley, L.; Smith, J.W. (Coast Guard Research and Development Center, Groton, CT (United States))

    1992-01-01

    This paper will discuss a joint effort by the U.S. Coast Guard Research Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler's capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  7. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  8. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  9. 78 FR 23981 - Proposed Collection; Comment Request for Form 1041 and Related Schedules D, J, and K-1

    Science.gov (United States)

    2013-04-23

    ... 1041 and Related Schedules D, J, and K-1 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION..., the IRS is soliciting comments concerning Form 1041 and related Schedules D, J, and K-1, U.S. Income... Losses (Schedule D), Accumulation Distribution for Certain Complex Trusts (Schedule J), and Beneficiary's...

  10. Program cost and schedule baseline; Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-11-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of the Radioactive Waste Management Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive Level (Level 0) and Program (Level 1) Change Control Boards (CCBs) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD) and the Waste Management System Requirements (WMSR) documents provides the technical basis for the PCSB. The PCSB establishes baseline values for the Yucca Mountain Site Characterization Project cost and schedule through submittal of the license application to the Nuclear Regulatory Commission (NRC).

  11. Is the cultural transmission of irrelevant tool actions in adult humans (Homo sapiens) best explained as the result of an evolved conformist bias?

    Science.gov (United States)

    McGuigan, Nicola; Gladstone, Daryl; Cook, Lisa

    2012-01-01

    Recent studies of social learning have revealed that adult humans are "over-imitators" who frequently reproduce a model's causally irrelevant tool actions to the detriment of task efficiency. At present our knowledge of adult over-imitation is limited to the fact that adults do over-imitate, we know very little about the causes of this behavior. The current study aimed to provide novel insights into adult over-imitation by extending a paradigm recently used with human children to explore social aspects of over-imitation. In the child study observers saw two models demonstrate a tool-use task using the same inefficient approach, or two models demonstrate different approaches to the task (one inefficient and one efficient). The manipulation of social influence came in the testing phase where the observer completed the task in the presence of either an inefficient model or an efficient model. We adapted the paradigm used in the child study to provide the first systematic exploration of factors which may lead to adult over-imitation including: 1) the presence of the model(s) during testing, 2) the presence of a competing efficient task demonstration, 3) the presence of a majority displaying the inefficient approach, and 4) the 'removal' of the experimental context during task completion. We show that the adult participants only over-imitated in conditions where the inefficient strategy was the majority approach witnessed. This tendency towards over-imitation was almost entirely eliminated when the participants interacted with the task when they believed the experiment to be complete. Our results suggest that adult over-imitation is best explained as a result of an evolved 'conformist bias' argued to be crucial to the transmission of human cultural behavior and one which may be unique in the animal kingdom.

  12. ATO Resource Tool -

    Data.gov (United States)

    Department of Transportation — Cru-X/ART is a shift management tool designed for?use by operational employees in Air Traffic Facilities.? Cru-X/ART is used for shift scheduling, shift sign in/out,...

  13. Experience in scheduled maintenance

    International Nuclear Information System (INIS)

    Tsai, M.T.

    1985-01-01

    As outage management affects both the cost and reliability of a nuclear power plant, performance of a scheduled maintenance outage in an efficient and effective manner is an important task in the operation of nuclear power plant. This paper covers the experience gained in the past ten refueling outages for the two BWR units at the First Nuclear Power Station of Taipower. The key to optimizing both the cost and schedule of a refueling outage is to maintain a high level of quality workmanship. The outage management in planning, scheduling, preparation, coordination, and cooperation, accompanied by the qualified in-house capability and sufficient outside support, have placed the refueling outages at the FNPS in a well controlled situation and have established the capacity factors of these two BWR units at a level which is 20% higher than the world average in the past years

  14. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  15. Integrating spatial support tools into strategic planning-SEA of the GMS North-South Economic Corridor Strategy and Action Plan

    International Nuclear Information System (INIS)

    Ramachandran, Pavit; Linde, Lothar

    2011-01-01

    The GMS countries, supported by the Asian Development Bank, have adopted a holistic, multidimensional approach to strengthen infrastructural linkages and facilitate cross border trade through (i) the establishment of a trans-boundary road connecting two economic nodes across marginalised areas, followed by 2) facilitation of environmentally and socially sound investments in these newly connected areas as a means to develop livelihoods. The North-South Economic Corridor is currently in its second phase of development, with investment opportunities to be laid out in the NSEC Strategy and Action Plan (SAP). It targets the ecologically and culturally sensitive border area between PR China's Yunnan Province, Northern Lao PDR, and Thailand. A trans-boundary, cross-sectoral Strategic Environmental Assessment was conducted to support the respective governments in assessing potential environmental and social impacts, developing alternatives and mitigation options, and feeding the findings back into the SAP writing process. Given the spatial dimension of corridor development-both with regard to opportunities and risks-particular emphasis was put in the application of spatial modelling tools to help geographically locate and quantify impacts as a means to guide interventions and set priorities.

  16. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  17. Fuzzy HRRN CPU Scheduling Algorithm

    OpenAIRE

    Bashir Alam; R. Biswas; M. Alam

    2011-01-01

    There are several scheduling algorithms like FCFS, SRTN, RR, priority etc. Scheduling decisions of these algorithms are based on parameters which are assumed to be crisp. However, in many circumstances these parameters are vague. The vagueness of these parameters suggests that scheduler should use fuzzy technique in scheduling the jobs. In this paper we have proposed a novel CPU scheduling algorithm Fuzzy HRRN that incorporates fuzziness in basic HRRN using fuzzy Technique FIS.

  18. 77 FR 6466 - Schedule for Rating Disabilities; AL Amyloidosis (Primary Amyloidosis)

    Science.gov (United States)

    2012-02-08

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 4 RIN 2900-AN75 Schedule for Rating Disabilities; AL... Department of Veterans Affairs (VA) is amending its Schedule for Rating Disabilities by updating the schedule of ratings for the hemic and lymphatic systems to include AL amyloidosis. This regulatory action is...

  19. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  20. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  1. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  2. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  3. Iterative robust multiprocessor scheduling

    NARCIS (Netherlands)

    Adyanthaya, S.; Geilen, M.; Basten, T.; Voeten, J.; Schiffelers, R.

    2015-01-01

    General purpose platforms are characterized by unpredictable timing behavior. Real-time schedules of tasks on general purpose platforms need to be robust against variations in task execution times. We define robustness in terms of the expected number of tasks that miss deadlines. We present an

  4. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  5. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  6. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  7. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    Science.gov (United States)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  8. Scheduling the maintenance of gaseous diffusion and electric power distribution plants

    International Nuclear Information System (INIS)

    Chauvet, D.

    1990-01-01

    A computer aided scheduling applied to the maintenance of a uranium enrichment plant is presented. The plant exploits gaseous diffusion and electric power distribution plants, for which the operating conditions must be satisfied. The management and the execution of the maintenance actions are computer aided. Concerning the techniques, the cost, the safety and the scheduling actions were optimized [fr

  9. Scheduling and order acceptance for the customised stochastic lot scheduling problem

    NARCIS (Netherlands)

    van Foreest, Nicky D.; Wijngaard, Jacob; van der Vaart, Taco

    2010-01-01

    This paper develops and analyses several customer order acceptance policies to achieve high bottleneck utilisation for the customised stochastic lot scheduling problem (CSLSP) with large setups and strict order due dates. To compare the policies, simulation is used as the main tool, due to the

  10. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    be that the objects routed have an availability time window and a delivery time window or that locations on the path have a service time window. When routing moving transportation objects such as vehicles and vessels schedules are made in connection with the routing. Such schedules represent the time for the presence......In today’s globalized society, transport contributes to our daily life in many different ways. The production of the parts for a shelf ready product may take place on several continents and our travel between home and work, vacation travel and business trips has increased in distance the last...... couple of decades. To deliver competitive service and price, transportation today needs to be cost effective. A company requiring for things to be shipped will aim at having the freight shipped as cheaply as possible while often satisfying certain time constraints. For the transportation company...

  11. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  12. CMS Multicore Scheduling Strategy

    CERN Document Server

    Perez-Calero Yzquierdo, Antonio

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue Moores Law style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications. Also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multi-core jobs on the GRID based on the glideIn WMS submission infrastructure. We will present the individual components of the strategy, from special site specific queues used during provisioning of resources and implications to scheduling; to dynamic partitioning within a single pilot to allow to transition to multi-core or whole-node scheduling on site level without disallowing single-core jobs. In this presentation, we will present the experiences mad...

  13. The JFACC Planner/Scheduler

    National Research Council Canada - National Science Library

    2002-01-01

    ... (the JFACC Planner/Scheduler, or JPS) that supports generation of tightly linked air operations plans and schedules, as well as their adaptation in response to changing tasks and resource availability...

  14. Block Scheduling in High Schools.

    Science.gov (United States)

    Irmsher, Karen

    1996-01-01

    Block Scheduling has been considered a cure for a lengthy list of educational problems. This report reviews the literature on block schedules and describes some Oregon high schools that have integrated block scheduling. Major disadvantages included resistance to change and requirements that teachers change their teaching strategies. There is…

  15. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  16. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  17. Fundamentals of Shiftwork Scheduling

    National Research Council Canada - National Science Library

    Miller, James C

    2006-01-01

    ..., assessment tools and examples. Subjects discussed include fatigue, safety, calendar arithmetic, circadian stability, the Principles of Chronohygiene, shiftwork satisfaction, the numbers of workers needed, the basic structure...

  18. A computer-based group discussion support tool for achieving consensus and culture change using the organisational culture assessment instrument (OCAI): an action design research study

    NARCIS (Netherlands)

    Lee Mui Suan, Jaclyn

    2015-01-01

    Organisational culture change is a long and complex process that typically takes years to complete and has a very low success rate. This Action Design Research Study in an educational setting, addresses the problem by the proposed use of an Action Design Research Methodology to build and deploy an

  19. Scheduling of Power System Cells Integrating Stochastic Power Generation

    International Nuclear Information System (INIS)

    Costa, L.M.

    2008-12-01

    Energy supply and climate change are nowadays two of the most outstanding problems which societies have to cope with under a context of increasing energy needs. Public awareness of these problems is driving political willingness to take actions for tackling them in a swift and efficient manner. Such actions mainly focus in increasing energy efficiency, in decreasing dependence on fossil fuels, and in reducing greenhouse gas emissions. In this context, power systems are undergoing important changes in the way they are planned and managed. On the one hand, vertically integrated structures are being replaced by market structures in which power systems are un-bundled. On the other, power systems that once relied on large power generation facilities are witnessing the end of these facilities' life-cycle and, consequently, their decommissioning. The role of distributed energy resources such as wind and solar power generators is becoming increasingly important in this context. However, the large-scale integration of such type of generation presents many challenges due, for instance, to the uncertainty associated to the variability of their production. Nevertheless, advanced forecasting tools may be combined with more controllable elements such as energy storage devices, gas turbines, and controllable loads to form systems that aim to reduce the impacts that may be caused by these uncertainties. This thesis addresses the management under market conditions of these types of systems that act like independent societies and which are herewith named power system cells. From the available literature, a unified view of power system scheduling problems is also proposed as a first step for managing sets of power system cells in a multi-cell management framework. Then, methodologies for performing the optimal day-ahead scheduling of single power system cells are proposed, discussed and evaluated under both a deterministic and a stochastic framework that directly integrates the

  20. A study of the impact of scheduling parameters in heterogeneous computing environments

    Energy Technology Data Exchange (ETDEWEB)

    Powers, Sarah S [ORNL

    2014-01-01

    This paper describes a tool for exploring system scheduler parameter settings in a heterogeneous computing environment. Through the coupling of simulation and optimization techniques, this work investigates optimal scheduling intervals, the impact of job arrival prediction on scheduling, as well as how to best apply fair use policies. The developed simulation framework is quick and modular, enabling decision makers to further explore decisions in real-time regarding scheduling policies or parameter changes.

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  2. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  3. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  4. Planning and Scheduling of Payloads of AstroSat During Initial and ...

    Indian Academy of Sciences (India)

    The process is found to be labour intensive and several operational software tools, encompassing spacecraft sub-systems, on-orbit, domain and environmental constraints, were built-in and interacted with the scheduling tool for appropriate decision-making and science scheduling. The procedural details of the complex ...

  5. New Approaches to Irrigation Scheduling of Vegetables

    Directory of Open Access Journals (Sweden)

    Michael D. Cahn

    2017-04-01

    Full Text Available Using evapotranspiration (ET data for scheduling irrigations on vegetable farms is challenging due to imprecise crop coefficients, time consuming computations, and the need to simultaneously manage many fields. Meanwhile, the adoption of soil moisture monitoring in vegetables has historically been limited by sensor accuracy and cost, as well as labor required for installation, removal, and collection of readings. With recent improvements in sensor technology, public weather-station networks, satellite and aerial imaging, wireless communications, and cloud computing, many of the difficulties in using ET data and soil moisture sensors for irrigation scheduling of vegetables can now be addressed. Web and smartphone applications have been developed that automate many of the calculations involved in ET-based irrigation scheduling. Soil moisture sensor data can be collected through wireless networks and accessed using web browser or smartphone apps. Energy balance methods of crop ET estimation, such as eddy covariance and Bowen ratio, provide research options for further developing and evaluating crop coefficient guidelines of vegetables, while recent advancements in surface renewal instrumentation have led to a relatively low-cost tool for monitoring crop water requirement in commercial farms. Remote sensing of crops using satellite, manned aircraft, and UAV platforms may also provide useful tools for vegetable growers to evaluate crop development, plant stress, water consumption, and irrigation system performance.

  6. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  7. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    to scheduling problems with temporal dependencies between tasks. However, these problems appear in various contexts and with different properties. A group of the problems considered are related to vehicle routing problems, where transportation and time windows are important factors that must be accounted for....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied....... Column generation is an iterative exact solution method based on the theory of linear programming and is capable of providing provably optimal solutions. In some of the applications, the approach is modified to provide feasible solutions of high-quality in less time. The exceptional solution quality...

  8. Le Nordais on schedule

    International Nuclear Information System (INIS)

    Anon.

    1998-01-01

    The first phase of the Le Nordais wind farm project in the Gaspe Peninsula in Quebec is on schedule. It was announced that the project's first turbines will be turning by September 1998. Hydro-Quebec has agreed to buy power from the 100 MW wind farm. The Le Nordais consortium plans to have 76,750 kW turbines in service in Cap-Chat by December 1998. Many of the foundations for the towers are poured and a substation is under construction. The turbines that are currently in use come from Denmark, but 20 of the 76 turbines being slated for installation this year will come from NEG Micon Canada Inc.'s assembly plant in Quebec. The Quebec government is providing a $5.6 million grant for their production and for turbine assembly in Quebec. During phase two, an additional 57 turbines will be installed in Matane by the end of 1999. 1 fig

  9. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  10. 75 FR 10018 - Proposed Collection; Comment Request for Form 1041 and Related Schedules D, J, and K-1

    Science.gov (United States)

    2010-03-04

    ... 1041 and Related Schedules D, J, and K-1 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION..., the IRS is soliciting comments concerning Form 1041 and related Schedules D, J, and K-1, U.S. Income...), Accumulation Distribution for Certain Complex Trusts (Schedule J), and Beneficiary's Share of Income...

  11. Circannual basis of geographically distinct bird schedules.

    Science.gov (United States)

    Helm, Barbara; Schwabl, Ingrid; Gwinner, Eberhard

    2009-05-01

    To anticipate seasonal change, organisms schedule their annual activities by using calendrical cues like photoperiod. The use of cues must be fitted to local conditions because schedules differ between species and habitats. In complete absence of temporal information, many species show persistent circannual cycles that are synchronised, but not driven, by photoperiod. The contribution of circannual rhythms to timing under natural photoperiodic conditions is still unclear. In a suite of experiments, we examined timing in two closely related songbirds (Siberian and European stonechats) that inhabit similar latitudes but differ in seasonal behaviour. Under a more continental climate, Siberian stonechats breed later, moult faster and migrate further than European stonechats. We tested hypotheses for seasonal timing mechanisms by comparing the birds under constant and naturally changing daylengths. The taxa retained characteristic reproductive and moult schedules and hybrids behaved roughly intermediately. Based on their distinct circannual cycles, we expected European and Siberian stonechats to differ in photoperiodic responses at a given time of year. We found that the taxa responded, as predicted, in opposite ways to photoperiodic simulations as experienced on different migration routes. The findings indicate that circannual rhythms reflect geographically distinct periodic changes in seasonal disposition and cue-response mechanisms. Under natural daylengths, the phase relationship of the underlying circannual rhythm to the external year determines the action of photoperiod. Circannual rhythms are widespread among long-lived species. Accordingly, responses to environmental change, range expansion and novel migration patterns may depend on the particulars of a species' underlying circannual programming.

  12. Human Actions Made Tangible

    DEFF Research Database (Denmark)

    Buur, Jacob; Caglio, Agnese; Jensen, Lars Christian

    2014-01-01

    , a method developed to engage people from different backgrounds in collaboratively analysing videos with the help of physical objects. We will present one of these tools, Action Scrabble, for analysing temporal organisation of human actions. We work with a case of skilled forklift truck driving...

  13. Action Learning in China

    Science.gov (United States)

    Marquardt, Michael J.

    2015-01-01

    Action learning was introduced into China less than 20 years ago, but has rapidly become a valuable tool for organizations seeking to solve problems, develop their leaders, and become learning organizations. This article provides an historical overview of action learning in China, its cultural underpinnings, and five case studies. It concludes…

  14. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  15. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  16. Scheduling in the operating theatre.

    OpenAIRE

    Rose, M. B.; Davies, D. C.

    1984-01-01

    The effect of scheduling on the use of operating theatre time has been studied. Scheduling involved determining the average length of common operations and fitting them into the calculated available operating time. The technique has been shown to reduce significantly the variation in length of operating sessions, and it ensures the best use of available operating time.

  17. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  18. Bulletin publication schedule

    CERN Multimedia

    Publications Section, DG-CO Group

    2011-01-01

    The final edition (Nos 51-52/2011 and 1-2-3/2012) of the Bulletin this year will be published on Friday 16 December and will cover events at CERN from 19 December 2011 to 19 January 2012. Announcements for publication in this issue should reach the Communication Group or the Staff Association, as appropriate, by noon on Tuesday 13 December. Bulletin publication schedule for 2012 The table below lists the 2012 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 noon on Tuesdays at the latest.   Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Printed version 4-5   Tuesday 17 January Fridays 20 and 27 January Wednesday25 January 6-7   Tuesday 31 January Fridays 3 and 10 February Wednesday 8 February 8-9 Tuesday 14 February Fridays 17 and 24 february Wednesday 22 Februa...

  19. AsmL Specification of a Ptolemy II Scheduler

    DEFF Research Database (Denmark)

    Lázaro Cuadrado, Daniel; Koch, Peter; Ravn, Anders Peter

    2003-01-01

    Ptolemy II is a tool that combines different computational models for simulation and design of embedded systems. AsmL is a software specification language based on the Abstract State Machine formalism. This paper reports on development of an AsmL model of the Synchronous Dataflow domain scheduler...... of Ptolemy II. By building this model we can give precise semantics to the implementation. Furthermore it allows us to isolate the scheduling problem from the tool and make the potential parallelism of the implementation explicit. The model is executable and is tested against the implementation...

  20. Plan Generation and Evaluation Using Action Networks

    National Research Council Canada - National Science Library

    Peot, Mark

    2003-01-01

    ... from potential actions of the plan. Methods used to accomplish these results included the use of Action Networks, and development of a suite of analysis tools in support of the AFRL Campaign Assessment Tool...

  1. 2017 SmartWay Logistics Tool Demonstration

    Science.gov (United States)

    This EPA presentation provides information on the SmartWay Logistics Carrier Tool: its background and development, participation in the program, application process, emission metrics, tool demonstration, data collection, and schedule for 2017.

  2. 76 FR 57681 - Modification of Interlibrary Loan Fee Schedule

    Science.gov (United States)

    2011-09-16

    .... Knipling, Administrator, Agricultural Research Service. [FR Doc. 2011-23723 Filed 9-15-11; 8:45 am] BILLING... Service 7 CFR Part 505 RIN 0518-8AA04 Modification of Interlibrary Loan Fee Schedule AGENCY: Agricultural Research Service, USDA. ACTION: Proposed rule. SUMMARY: The Agricultural Research Service proposes to amend...

  3. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-21

    ... an electronic information system used to track review action assignments and customer satisfaction... disposal or reduce the retention period of records already authorized for disposal. NARA invites public... accumulation, agency records managers prepare schedules proposing retention periods for records and submit...

  4. 75 FR 48672 - Pesticides; Revised Fee Schedule for Registration Applications

    Science.gov (United States)

    2010-08-11

    ... the Federal Food, Drug, and Cosmetic Act (FFDCA). Section 33 also created a schedule of decision... entitled ``CR No.'' cross-references the current Congressional Record category number for convenience... Registration EPA No. CR No. Action (months) Service Fee FY 11/12 ($) R010 1 Food use\\1\\ 24 569,221 R020 2 Food...

  5. 76 FR 29802 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-05-23

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... administrative use by the agency of ] origin, the rights of the Government and of private persons directly... information system used to estimate the total life-cycle cost of equipment use, maintenance actions, and...

  6. Cogena, a novel tool for co-expressed gene-set enrichment analysis, applied to drug repositioning and drug mode of action discovery.

    Science.gov (United States)

    Jia, Zhilong; Liu, Ying; Guan, Naiyang; Bo, Xiaochen; Luo, Zhigang; Barnes, Michael R

    2016-05-27

    Drug repositioning, finding new indications for existing drugs, has gained much recent attention as a potentially efficient and economical strategy for accelerating new therapies into the clinic. Although improvement in the sensitivity of computational drug repositioning methods has identified numerous credible repositioning opportunities, few have been progressed. Arguably the "black box" nature of drug action in a new indication is one of the main blocks to progression, highlighting the need for methods that inform on the broader target mechanism in the disease context. We demonstrate that the analysis of co-expressed genes may be a critical first step towards illumination of both disease pathology and mode of drug action. We achieve this using a novel framework, co-expressed gene-set enrichment analysis (cogena) for co-expression analysis of gene expression signatures and gene set enrichment analysis of co-expressed genes. The cogena framework enables simultaneous, pathway driven, disease and drug repositioning analysis. Cogena can be used to illuminate coordinated changes within disease transcriptomes and identify drugs acting mechanistically within this framework. We illustrate this using a psoriatic skin transcriptome, as an exemplar, and recover two widely used Psoriasis drugs (Methotrexate and Ciclosporin) with distinct modes of action. Cogena out-performs the results of Connectivity Map and NFFinder webservers in similar disease transcriptome analyses. Furthermore, we investigated the literature support for the other top-ranked compounds to treat psoriasis and showed how the outputs of cogena analysis can contribute new insight to support the progression of drugs into the clinic. We have made cogena freely available within Bioconductor or https://github.com/zhilongjia/cogena . In conclusion, by targeting co-expressed genes within disease transcriptomes, cogena offers novel biological insight, which can be effectively harnessed for drug discovery and

  7. 75 FR 79296 - Schedules of Controlled Substances: Placement of 5-Methoxy-N,N-Dimethyltryptamine into Schedule I...

    Science.gov (United States)

    2010-12-20

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration 21 CFR Part 1308 [Docket No. DEA-331F... Controlled Substances Act AGENCY: Drug Enforcement Administration (DEA), Department of Justice. ACTION: Final... for schedule I registration in accordance with 21 CFR 1301.18. Constitutional concerns: Several...

  8. Performance analysis of a large-grain dataflow scheduling paradigm

    Science.gov (United States)

    Young, Steven D.; Wills, Robert W.

    1993-01-01

    A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

  9. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  10. Autonomous power system: Integrated scheduling

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

  11. To widen the action tools against the climatic change by domestic projects. Evaluation report; Elargir les instruments d'action contre le changement climatique grace aux projets domestiques. Rapport d'evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Arnaud, E.; Dominicis, A. de; Leguet, B.; Leseur, A.; Perthuis, Ch. de

    2005-11-15

    In the framework of the climatic change fight, each country aims to implement tools of emissions reduction. In France, the european system of CO{sub 2} quotas exchange, applied on the more emitted installations, covers less than 30% of the national carbon emissions. The other 70% are free of taxes. The 'climate mission' realized an evaluation of the emission reduction in the case of a new policy aiming to develop domestic projects of emission control. This report presents the study and its conclusions: the domestic projects, the possibilities of these projects in the transportation agriculture and forests and building sectors, the implementing conditions.

  12. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  13. 77 FR 42332 - Large Power Transformers From Korea; Revised Schedule for the Subject Investigation

    Science.gov (United States)

    2012-07-18

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1189 (Final)] Large Power Transformers From Korea; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: July 12, 2012. FOR FURTHER INFORMATION CONTACT: Edward...

  14. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  15. When greediness fails: examples from stochastic scheduling

    NARCIS (Netherlands)

    Uetz, Marc Jochen

    2003-01-01

    The purpose of this paper is to present examples for the sometimes surprisingly different behavior of deterministic and stochastic scheduling problems. In particular, it demonstrates some seemingly counterintuitive properties of optimal scheduling policies for stochastic machine scheduling problems.

  16. Immunization Schedules for Preteens and Teens

    Science.gov (United States)

    ... Vaccines: The Basics Immunization Schedule for Preteens and Teens (7 through 18 Years) Recommend on Facebook Tweet ... 2018 Immunization Schedule Recommended Vaccinations for Preteens and Teens Schedule for preteens and teens (7 through 18 ...

  17. Scheduling Spitzer: The SIRPASS Story

    Science.gov (United States)

    Mittman, David S.; Hawkins, Robert

    2013-01-01

    NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

  18. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  19. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  20. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  1. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  2. Multi-criteria evaluation methods in the production scheduling

    Science.gov (United States)

    Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.

    2016-08-01

    The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.

  3. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  4. On the Inclusion of Externally Controlled Actions in Action Planning

    NARCIS (Netherlands)

    Tsai, C.C.; Knoblich, G.K.; Sebanz, N.

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial

  5. On the Inclusion of Externally Controlled Actions in Action Planning

    Science.gov (United States)

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  6. Workload Schedulers - Genesis, Algorithms and Comparisons

    OpenAIRE

    Sliwko, L.; Getov, Vladimir

    2015-01-01

    In this article we provide brief descriptions of three classes of schedulers: Operating Systems Process Schedulers, Cluster Systems, Jobs Schedulers and Big Data Schedulers. We describe their evolution from early adoptions to modern implementations, considering both the use and features of algorithms. In summary, we discuss differences between all presented classes of schedulers and discuss their chronological development. In conclusion, we highlight similarities in the focus of scheduling st...

  7. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    Science.gov (United States)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  8. Non-clairvoyant Scheduling Games

    Science.gov (United States)

    Dürr, Christoph; Nguyen, Kim Thang

    In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the game, players may follow selfish strategies to optimize their cost and therefore their behaviors do not necessarily lead the game to an equilibrium. Even in the case there is an equilibrium, its makespan might be much larger than the social optimum, and this inefficiency is measured by the price of anarchy - the worst ratio between the makespan of an equilibrium and the optimum. Coordination mechanisms aim to reduce the price of anarchy by designing scheduling policies that specify how jobs assigned to a same machine are to be scheduled. Typically these policies define the schedule according to the processing times as announced by the jobs. One could wonder if there are policies that do not require this knowledge, and still provide a good price of anarchy. This would make the processing times be private information and avoid the problem of truthfulness. In this paper we study these so-called non-clairvoyant policies. In particular, we study the RANDOM policy that schedules the jobs in a random order without preemption, and the EQUI policy that schedules the jobs in parallel using time-multiplexing, assigning each job an equal fraction of CPU time.

  9. A knowledge-based decision support system for payload scheduling

    Science.gov (United States)

    Tyagi, Rajesh; Tseng, Fan T.

    1988-01-01

    This paper presents the development of a prototype Knowledge-based Decision Support System, currently under development, for scheduling payloads/experiments on space station missions. The DSS is being built on Symbolics, a Lisp machine, using KEE, a commercial knowledge engineering tool.

  10. Planning and Scheduling of Payloads of ASTROSAT during Initial ...

    Indian Academy of Sciences (India)

    41

    2015-09-28

    Sep 28, 2015 ... environmental constraints, were built-in and interacted with the scheduling tool for appropriate .... The sensors for measuring attitude are star sensors, gyroscopes, 4π Sun sensors and magnetometers. ... attitude control if momentum capability of reaction wheels becomes insufficient. An additional constraint ...

  11. A stochastic simulation approach for production scheduling and ...

    African Journals Online (AJOL)

    The present paper aims to develop a simulation tool for tile manufacturing companies. The paper shows how simulation approach can be useful to support management decisions related to production scheduling and investment planning. Particularly the aim is to demonstrate the importance of an information system in tile ...

  12. AsmL Specification of a Ptolemy II Scheduler

    DEFF Research Database (Denmark)

    Lázaro Cuadrado, Daniel; Koch, Peter; Ravn, Anders Peter

    2003-01-01

    Ptolemy II is a tool that combines different computational models for simulation and design of embedded systems. AsmL is a software specification language based on the Abstract State Machine formalism. This paper reports on development of an AsmL model of the Synchronous Dataflow domain scheduler...

  13. Interval algebra - an effective means of scheduling surveillance radar networks

    CSIR Research Space (South Africa)

    Focke, RW

    2015-05-01

    Full Text Available -term planning is desirable, there is still work required to make these practically feasible in all cases. There are various architectures used for creating a mulstisensor man- 3 ager. Traditionally, a centralised architecture has been used, where a central... in the timeline of sensing actions for each sensor. This is known as the scheduling function, which is the focus of this work. A sensor coordination algorithm is considered a nimble scheduler when it is able to rapidly adapt to changes in the surveyed area...

  14. Present and future hydropower scheduling in Statkraft

    Science.gov (United States)

    Bruland, O.

    2012-12-01

    uncertainties have thus far been handled superficially. Statkraft has initiated a program called ENKI to approach these issues. A part of this program is to apply distributed models for hydrological forecasting. Developing methodologies to handle uncertainties in the observations, the meteorological forecasts, the model itself and how to update the model with this information are other parts of the program. Together with energy price expectations and information about the state of the energy production system the hydrological forecast is input to the next step in the production scheduling both on short and long term. The long term schedule for reservoir filling is premise provider to the short term optimizing of water. The long term schedule is based on the actual reservoir levels, snow storages and a long history of meteorological observations and gives an overall schedule at a regional level. Within the regions a more detailed tool is used for short term optimizing of the hydropower production Each reservoir is scheduled taking into account restrictions in the water courses and cost of start and stop of aggregates. The value of the water is calculated for each reservoir and reflects the risk of water spillage. This compared to the energy price determines whether an aggregate will run or not. In a gradually more complex energy system with relatively lower regulated capacity this is an increasingly more challenging task.

  15. Design Principles and Algorithms for Air Traffic Arrival Scheduling

    Science.gov (United States)

    Erzberger, Heinz; Itoh, Eri

    2014-01-01

    This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

  16. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .... Return of Partnership Income), Schedule D (Capital Gains and Losses), Schedule K-1 (Partner's Share of...' Capital Accounts), and Schedule M-3 (Net Income (Loss) Reconciliation for Certain Partnerships)). DATES... Partnership Income (Form 1065), Capital Gains and Losses (Schedule D), Partner's Share of Income, Credits...

  17. Statistical Tools Applied in the Characterisation and Evaluation of a Thermo-Hygrometric Corrective Action Carried out at the Noheda Archaeological Site (Noheda, Spain

    Directory of Open Access Journals (Sweden)

    Miguel Ángel Valero

    2014-01-01

    Full Text Available The Noheda archaeological site is unique and exceptional for its size, and the quality and conservation condition of the Roman mosaic pavement covering its urban pars. In 2008 a tent was installed as protection from rain and sun. Being of interest to characterise the microclimate of the remains, six probes with relative humidity and temperature sensors were installed in 2013 for this purpose. Microclimate monitoring allowed us to check relative humidity differences resulting from the groundwater level, as well as inner sensors reaching maximum temperatures higher than the outdoors ones as a consequence of the non-ventilated tent covering the archaeological site. Microclimatic conditions in the archaeological site were deemed detrimental for the conservation of the mosaics. Thus, in summer 2013, expanded clay and geotextile were installed over the mosaics as a corrective action. The outcomes of this study have proven the effectiveness of this solution to control temperature and relative humidity, helping to configure a more stable microclimate suitable for preservation of the mosaic.

  18. An informatics-based tool to assist researchers in initiating research at an academic medical center: Vanderbilt Customized Action Plan (V-CAP)

    Science.gov (United States)

    Pulley, Jill M.; Harris, Paul A.; Yarbrough, Tonya; Swafford, Jonathan; Edwards, Terri; Bernard, Gordon R.

    2013-01-01

    The regulatory review and approval process is a significant part of the workflow associated with initiating clinical and translational research projects. Ambiguity concerning submission requirements and expected times associated with the review process can create additional work for research teams and ultimately delay important scientific projects. In an effort to provide assistance to investigators, we have developed an online interactive interface which elicits basic study characteristics for a single project and subsequently produces a list of required administrative applications needed for approval along with clear instructions concerning expectations from the research team. This system, the Vanderbilt Customized Action Plan (V-CAP), was launched in October, 2006 and been used extensively. The informatics systems-based approach is scalable to other academic medical centers and the authors report details concerning: (1) V-CAP project design; (2) a reference workflow associated with Vanderbilt policies and regulations; (3) V-CAP metrics of use by Vanderbilt research teams; and (4) a list of recommendations for other academic centers considering a similar systems-based approach for helping researchers efficiently navigate processes related to regulatory approval. PMID:20042844

  19. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  20. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  3. Schedule goals for civilian radioactive waste management - Can we have confidence?

    International Nuclear Information System (INIS)

    Bartlett, John W.

    1992-01-01

    The schedule goals for the Civilian Radioactive Waste Management Program are to begin spent fuel receipt from reactors in 1998 and to begin waste disposal in 2010. Although there are various reasons for these goals, the most important is to set demanding goals and be responsible for achieving them. Meeting these goals requires taking into account an array of facilitators and potential inhibitors that affect schedule confidence. Facilitators include actions to prioritize the program, and make its operations efficient. These include actions to baseline activities, emphasize communications with constituencies, use help from others, and facilitate the licensing process. Inhibitors include problems in monitored storage facilities negotiations, obstruction by the State of Nevada, funding deficiencies, and technical uncertainties at Yucca Mountain. At the present time, the program can, in principle meet its schedule goals. In the near-term, the linchpin of schedule confidence is Congressional action to match the Administration's commitment to progress. (author)

  4. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use of...

  5. Gain scheduling using the youla parameterization

    DEFF Research Database (Denmark)

    Niemann, H.H.; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector theta cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector theta has been derived by using the Youla parameterization...

  6. Transfer of a repair gene from E. coli as a tool in studies on the action of alkylating mutagens in tobacco

    International Nuclear Information System (INIS)

    Veleminsky, J.; Briza, J.; Angelis, K.; Satava, J.; Margison, G.

    1990-01-01

    Full text: Alkylating agents (AA) belong to the most potent mutagens. Nevertheless, the role of individual DNA lesions in the toxic and mutagenic effects of AA in plants are poorly understood. A new tool to study this topic is the transfer of a gene with a specified repair function for a specific DNA lesion. Differences in the responses to AA can be assumed to be caused by changes in the amount of DNA lesion(s) repaired by the introduced gene. Methyl-nitroso urea (MNU) produces 06-methylG and other DNA lesions methylated at O-sites. Taurine-chloroethyl-nitrosourea (TCNH) causes DNA-DNA crosslinks, the formation of which starts with the chloroethylation of G at 06. Both 06-methylG, 04-methylT, O-methylphosphotriesters produced by MNH and 06-chloroethylG produced by TCNH are known to be repaired with AT coded by E. coli ada gene. Transfer of this gene and its expression in tobacco appeared to increase the resistance of the transformed cell to both AA tested. It seems, therefore, likely that the DNA lesions mentioned above are at least partly involved in the production of toxic effects of AA in tobacco. (author)

  7. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  8. Optimal randomized scheduling by replacement

    Energy Technology Data Exchange (ETDEWEB)

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  9. 75 FR 51531 - Proposed Collection; Comment Request for Forms 941, 941-PR, 941-SS, 941-X, 941-X(PR), Schedule B...

    Science.gov (United States)

    2010-08-20

    ... 941, 941-PR, 941- SS, 941-X, 941-X(PR), Schedule B (Form 941), Schedule R (Form 941) and Schedule B (Form 941-PR) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... comments concerning Forms 941 (Employer's Quarterly Federal Tax Return), 941-PR (Planilla Para La...

  10. 78 FR 47056 - Proposed Collection; Comment Request for Forms 941, 941-PR, 941-SS, 941-X, 941-X(PR), Schedule B...

    Science.gov (United States)

    2013-08-02

    ... 941, 941-PR, 941- SS, 941-X, 941-X(PR), Schedule B (Form 941), Schedule R (Form 941)and Schedule B (Form 941-PR) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Forms 941 (Employer's Quarterly Federal Tax Return), 941-PR, 941-SS (Employer's Quarterly Federal Tax...

  11. Intelligent Scheduling of a Grid-Connected Heat Pump in a Danish Detached House

    DEFF Research Database (Denmark)

    Gianniou, Panagiota; Foteinaki, Kyriaki; Heller, Alfred

    This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation...... thermal comfort conditions. The proposed methodology bridges dynamic building modelling with optimization of real-time operation of HVAC systems offering a detailed model for building physics, especially regarding thermal mass and a stochastic price-based control....

  12. Biopharmaceutical Process Optimization with Simulation and Scheduling Tools

    OpenAIRE

    Petrides, Demetri; Carmichael, Doug; Siletti, Charles; Koulouris, Alexandros

    2014-01-01

    Design and assessment activities associated with a biopharmaceutical process are performed at different levels of detail, based on the stage of development that the product is in. Preliminary “back-of-the envelope” assessments are performed early in the development lifecycle, whereas detailed design and evaluation are performed prior to the construction of a new facility. Both the preliminary and detailed design of integrated biopharmaceutical processes can be greatly assisted by the use of p...

  13. NutriLive: An Integrated Nutritional Approach as a Sustainable Tool to Prevent Malnutrition in Older People and Promote Active and Healthy Ageing—The EIP-AHA Nutrition Action Group

    Directory of Open Access Journals (Sweden)

    Maddalena Illario

    2016-01-01

    Full Text Available The present document describes a nutritional approach that is nested in the European Innovation Partnership for Active and Healthy Aging (EIP-AHA and aims to provide the first common European program translating an integrated approach to nutritional frailty in terms of a multidimensional and transnational methodology. The document has been developed by the A3 Nutrition Action Area of the EIP-AHA and aims at providing a stepwise approach to malnutrition in older citizens, identifying adequate interventions based on a unified assessment and ICT-supported solutions. “NutriLive” is an integrated nutritional approach, represented by a structured Screening-Assessment-Monitoring-Action-Pyramid-Model (SAM-AP. Its core concept is the stratification of the nutritional needs, considered by the working group as the key for targeted, effective, and sustainable interventions. “NutriLive” tries to close gaps in epidemiological data within an aging population, creating a unified language to deal with the topic of nutrition and malnutrition in Europe. By assembling all the validated screening, assessment, and monitoring tools on malnutrition in a first pyramid, which is interrelated to a second intervention pyramid, the A3 Nutrition WG identifies a common, integrated vision on the nutritional approach to frailty, which applies to the various health care settings.

  14. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    Dynamic models of congestion so far rely on exogenous scheduling preferences of travelers, based for example on disutility of deviation from a preferred departure or arrival time for a trip. This paper provides a more fundamental view in which travelers derive utility just from consumption and le...

  15. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  16. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project

  17. Course Scheduling and Academic Performance

    Science.gov (United States)

    Dills, Angela K.; Hernandez-Julian, Rey

    2008-01-01

    This paper examines the relationship between course scheduling and student achievement, controlling for student and course characteristics. The literature in psychology recognizes that performance varies by time of day and that spacing learning out over time may foster greater long-term memory of items. We use student grades as a measure of…

  18. Job scheduling, cooperation and control

    NARCIS (Netherlands)

    Calleja, P.; Estevez Fernandez, M.A.; Borm, P.; Hamers, H.

    2006-01-01

    This paper studies one machine job scheduling situations where clients can have more than one job to be processed and where a job can be of interest for different players. Corresponding cooperative games are introduced and a result on balancedness is provided. © 2005 Elsevier B.V. All rights

  19. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different...

  20. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  1. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  2. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  3. Production planning and scheduling with material handling using modelling and simulation

    Directory of Open Access Journals (Sweden)

    Krenczyk Damian

    2017-01-01

    Full Text Available Increase flexibility of manufacturing requires implementation of effective planning IT tools. Planning and scheduling problems traditionally consider the production resources as the only constraints. Since the raw material and intermediate transferring times are relevant in relation to the production times, it is required to model the material handling equipment and its activities. The problem of scheduling subject to manufacturing and logistical constraints based on data-driven models generation method is presented. A KbRS and FlexSim systems are used as a scheduling tool.

  4. Instrumental uncertainty as a determinant of behavior under interval schedules of reinforcement

    Directory of Open Access Journals (Sweden)

    Alicia DeRusso

    2010-05-01

    Full Text Available Interval schedules of reinforcement are known to generate habitual behavior, the performance of which is less sensitive to revaluation of the earned reward and to alterations in the action-outcome contingency. Here we report results from experiments using different types of interval schedules of reinforcement in mice to assess the effect of uncertainty, in the time of reward availability, on habit formation. After limited training, lever pressing under fixed interval (FI, low interval uncertainty or random interval schedules (RI, higher interval uncertainty was sensitive to devaluation, but with more extended training, performance of animals trained under RI schedules became more habitual, i.e. no longer sensitive to devaluation, whereas performance of those trained under FI schedules remained goal-directed. When the press-reward contingency was reversed by omitting reward after pressing but presenting reward in the absence of pressing, lever pressing in mice previously trained under FI decreased more rapidly than that of mice trained under RI schedules. Further analysis revealed that action-reward contiguity is dramatically reduced in lever pressing under RI schedules, whereas action-reward correlation does not vary significantly. These data indicate that the extent of goal-directedness could vary as a function of temporal uncertainty.

  5. Integrated scheduling of tasks and gynecologists to improve patient appointment scheduling : a case study

    NARCIS (Netherlands)

    van de Vrugt, Maartje; Luen-English, Samuel J.; Bastiaansen, W.A.P.; Kleinluchtenbeld, S.; Lardinois, W.T.P.; Pots, M.H.; Schoonbergen, D.H.; Hans, Erwin W.; Hurink, Johann L.; Boucherie, Richardus J.

    Like many hospital departments, the gynecology department of the Jeroen Bosch Hospital experienced difficulties with scheduling outpatient appointments at the medically preferred times. Despite the time invested in creating the schedule, the compliance of the achieved schedules with the preferences

  6. Action physics

    Science.gov (United States)

    McGinness, Lachlan P.; Savage, C. M.

    2016-09-01

    More than a decade ago, Edwin Taylor issued a "call to action" that presented the case for basing introductory university mechanics teaching around the principle of stationary action [E. F. Taylor, Am. J. Phys. 71, 423-425 (2003)]. We report on our response to that call in the form of an investigation of the teaching and learning of the stationary action formulation of physics in a first-year university course. Our action physics instruction proceeded from the many-paths approach to quantum physics to ray optics, classical mechanics, and relativity. Despite the challenges presented by action physics, students reported it to be accessible, interesting, motivational, and valuable.

  7. Designing a prototype of the ITER pulse scheduling system

    International Nuclear Information System (INIS)

    Yamamoto, T.; Yonekawa, I.; Ohta, K.; Hosoyama, H.; Hashimoto, Y.; Wallander, A.; Winter, A.; Sugie, T.; Kusama, Y.; Kawano, Y.; Yoshino, R.

    2012-01-01

    Highlights: ► We designed a prototype of the ITER pulse scheduling system. ► Structure of ITER pulse schedules was designed. ► Validation and automatic value assignment functions were adopted. ► A prototype will be implemented in 2011. - Abstract: A prototype of the ITER pulse scheduling system that prepares and manages parameters for ITER plasma operations has been designed. Based on the analyzed requirements on the system, structure of the parameters and necessary functions were determined. Segment and module structures were tuned to the ITER requirements. Three types of validations assure sanity of the parameters. The design limits check and the operation window check verify whether the values of the parameters do not exceed the limits. The consistency check calculates dependency among parameters in accordance with logics described in a scripting language. The ITER pulse scheduling system provides interface with a physics model and simulator. Some abstract physics parameters are converted to engineering parameters with the physics simulation. The results of simulation such as plasma characteristics of specified parameters are also shown to the researchers. The tool to specify the parameters is data-driven. Therefore, it is flexible for changes of number of the parameters. A prototype is being implemented in 2011. Using the prototype, this design will be verified and refined. The evaluation of the prototype will be a basis of the final production of the ITER pulse scheduling system.

  8. A risk-based decision-aiding tool for waste disposal

    International Nuclear Information System (INIS)

    Weiner, R.F.; Reiser, A.S.; Elcock, C.G.; Nevins, S.

    1997-01-01

    N-CART (the National Spent Nuclear Fuel Program Cost Analysis and Risk Tool) is being developed to aid in low-risk, cost-effective, timely management of radioactive waste and spent nuclear fuel, and can therefore be used in management of mixed waste. N-CART provides evaluation of multiple alternatives and presents the consequences of proposed waste management activities in a clear and concise format. N-CART's decision-aiding analyses include comparisons and sensitivity analyses of multiple alternatives and allows the user to perform quick turn-around open-quotes what ifclose quotes studies to investigate various scenarios. Uncertainties in data (such as cost and schedule of various activities) are represented as distributions. N-CART centralizes documentation of the bases of program alternatives and program decisions, thereby supporting responses to stakeholders concerns. The initial N-CART design considers regulatory requirements, costs, and schedules for alternative courses of action. The final design will include risks (public health, occupational, economic, scheduling), economic benefits, and the impacts of secondary waste generation. An optimization tool is being incorporated that allows the user to specify the relative importance of cost, time risks, and other bases for decisions. The N-CART prototype can be used to compare the costs and schedules of disposal alternatives for mixed low-level radioactive waste (MLLW) and greater-than-Class-C (GTCC) waste, as well as spent nuclear fuel (SNF) and related scrap material

  9. Action Research in Practice

    Science.gov (United States)

    Piggot-Irvine, Eileen

    2009-01-01

    Action research places a powerful tool for school improvement in the hands of teachers. By highlighting the outcomes that are possible and presenting clear steps in the research process, this book is one to encourage anyone who is seeking to implement evidence-based school improvement. Eileen Piggot-Irvine uses her Problem Resolving Action…

  10. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  11. Requested meals versus scheduled meals

    Directory of Open Access Journals (Sweden)

    Ciampolini M

    2012-04-01

    Full Text Available Mario CiampoliniPreventive Gastroenterology Unit, Department of Paediatrics, Università di Firenze, Florence, ItalyBackground: Scheduled meals are considered to be equivalent to those requested by the infant (null hypothesis. In adults, we have found high blood glucose before scheduled meals and low blood glucose after recognition of validated initial hunger. Low preprandial blood glucose is associated with a decrease in energy intake and body weight both in adults who are overtly overweight and in those who are of normal weight with insulin resistance (hidden overweight. In this study, we investigated the validity of the null hypothesis between scheduled and requested meals in 2-year-old infants with chronic nonspecific diarrhea.Methods: We trained a "recognizing request" meal pattern in 70 mother-infant pairs. The trained meal pattern consisted of administering food after a first request that we validated by blood glucose measurement in the hospital laboratory. Using a 7-day food diary, mothers reported preprandial blood glucose measurements for their infants three times a day. We assessed mean preprandial blood glucose, daily energy intake, days with diarrhea, blood parameters, and anthropometry before training and 4 months after training, and compared the results with measurements in 73 randomly selected untrained controls.Results: In the trained group, there was a decrease in mean blood glucose from 86.9 ± 9.4 mg/dL to 76.4 ± 6.7 mg/dL (P < 0.0001, as well as a decrease in energy intake and days with diarrhea in comparison with control infants who maintained scheduled meals. Only two of 21 infants who had a mean blood glucose lower than 81.2 mg/dL at recruitment showed a statistically significant decrease in mean blood glucose, whereas 36 of 49 infants above this cutoff level showed a statistically significant decrease after training (Chi-square test, P < 0.0001.Conclusion: Requested meals are associated with low preprandial blood

  12. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  13. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  14. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    through, for example, Program Evaluation and Review Technique, Critical Path Method and Gantt Charts (Blanchard & Fabrycky, 2006, esp. Chap. 11...million lines in the F-15E. Lines of code in the F-35 vary with source and date. A 2014 CRS report estimates F- 35 software as containing...set of tasks (e.g., PERT, Gantt Charts) 4 SCHEDULE EST. RELATIONSHIPS Some Candidate Explanatory Variables • Risk Reduction Efforts • Contract

  15. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  17. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  18. Ada and cyclic runtime scheduling

    Science.gov (United States)

    Hood, Philip E.

    1986-01-01

    An important issue that must be faced while introducing Ada into the real time world is efficient and prodictable runtime behavior. One of the most effective methods employed during the traditional design of a real time system is the cyclic executive. The role cyclic scheduling might play in an Ada application in terms of currently available implementations and in terms of implementations that might be developed especially to support real time system development is examined. The cyclic executive solves many of the problems faced by real time designers, resulting in a system for which it is relatively easy to achieve approporiate timing behavior. Unfortunately a cyclic executive carries with it a very high maintenance penalty over the lifetime of the software that is schedules. Additionally, these cyclic systems tend to be quite fragil when any aspect of the system changes. The findings are presented of an ongoing SofTech investigation into Ada methods for real time system development. The topics covered include a description of the costs involved in using cyclic schedulers, the sources of these costs, and measures for future systems to avoid these costs without giving up the runtime performance of a cyclic system.

  19. Quick Spacecraft Thermal Analysis Tool, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — For spacecraft design and development teams concerned with cost and schedule, the Quick Spacecraft Thermal Analysis Tool (QuickSTAT) is an innovative software suite...

  20. Issues in Locomotive Crew Management and Scheduling

    Science.gov (United States)

    1990-11-01

    This study explores matters related to the scheduling and management of locomotive crews, particularly as they : might contribute to fatigue and stress. It describes how crews are scheduled currently, why there is so much : unpredictability in schedu...

  1. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  2. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  3. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  4. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  5. Electric power scheduling - A distributed problem-solving approach

    Science.gov (United States)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity.

  6. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  7. Agile Systems Engineering-Kanban Scheduling Subsection

    Science.gov (United States)

    2017-03-10

    Agile Systems Engineering – Kanban Scheduling Subsection Technical Report SERC-2017-TR-104 March 10, 2017 Principal Investigator: Dr...scheduling systems based on explicit, transparent, and continuously updated value of work [6], [7], [8]. This Kanban -based Scheduling System Network (KSSN...and literature searches. • RT-35/35A, Agile-Lean Software Engineering (ALSE) Evaluating Kanban in SE, focused on using pull scheduling techniques

  8. IOPS advisor: Research in progress on knowledge-intensive methods for irregular operations airline scheduling

    Science.gov (United States)

    Borse, John E.; Owens, Christopher C.

    1992-01-01

    Our research focuses on the problem of recovering from perturbations in large-scale schedules, specifically on the ability of a human-machine partnership to dynamically modify an airline schedule in response to unanticipated disruptions. This task is characterized by massive interdependencies and a large space of possible actions. Our approach is to apply the following: qualitative, knowledge-intensive techniques relying on a memory of stereotypical failures and appropriate recoveries; and quantitative techniques drawn from the Operations Research community's work on scheduling. Our main scientific challenge is to represent schedules, failures, and repairs so as to make both sets of techniques applicable to the same data. This paper outlines ongoing research in which we are cooperating with United Airlines to develop our understanding of the scientific issues underlying the practicalities of dynamic, real-time schedule repair.

  9. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  10. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  11. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  12. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  13. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  14. 7 CFR 283.29 - Scheduling conference.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Scheduling conference. 283.29 Section 283.29... Procedure for Appeals of QC Claims of Less Than $50,000 § 283.29 Scheduling conference. (a) Time and place. The ALJ shall direct the parties or their counsel to attend a scheduling conference following the...

  15. The minimalist grammar of action

    Science.gov (United States)

    Pastra, Katerina; Aloimonos, Yiannis

    2012-01-01

    Language and action have been found to share a common neural basis and in particular a common ‘syntax’, an analogous hierarchical and compositional organization. While language structure analysis has led to the formulation of different grammatical formalisms and associated discriminative or generative computational models, the structure of action is still elusive and so are the related computational models. However, structuring action has important implications on action learning and generalization, in both human cognition research and computation. In this study, we present a biologically inspired generative grammar of action, which employs the structure-building operations and principles of Chomsky's Minimalist Programme as a reference model. In this grammar, action terminals combine hierarchically into temporal sequences of actions of increasing complexity; the actions are bound with the involved tools and affected objects and are governed by certain goals. We show, how the tool role and the affected-object role of an entity within an action drives the derivation of the action syntax in this grammar and controls recursion, merge and move, the latter being mechanisms that manifest themselves not only in human language, but in human action too. PMID:22106430

  16. The minimalist grammar of action.

    Science.gov (United States)

    Pastra, Katerina; Aloimonos, Yiannis

    2012-01-12

    Language and action have been found to share a common neural basis and in particular a common 'syntax', an analogous hierarchical and compositional organization. While language structure analysis has led to the formulation of different grammatical formalisms and associated discriminative or generative computational models, the structure of action is still elusive and so are the related computational models. However, structuring action has important implications on action learning and generalization, in both human cognition research and computation. In this study, we present a biologically inspired generative grammar of action, which employs the structure-building operations and principles of Chomsky's Minimalist Programme as a reference model. In this grammar, action terminals combine hierarchically into temporal sequences of actions of increasing complexity; the actions are bound with the involved tools and affected objects and are governed by certain goals. We show, how the tool role and the affected-object role of an entity within an action drives the derivation of the action syntax in this grammar and controls recursion, merge and move, the latter being mechanisms that manifest themselves not only in human language, but in human action too.

  17. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  18. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  19. Electric power scheduling: A distributed problem-solving approach

    Science.gov (United States)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity. The value-driven free-market economic model is such a tool.

  20. Optimized Waterspace Management and Scheduling Using Mixed-Integer Linear Programming

    Science.gov (United States)

    2016-01-01

    simulations were performed using the IBM’s ILOG CPLEX optimization software [35]. All simulations were performed on a 2.8 GHz quad-core CPU equipped with...temporal schedule of the overall mission. The MILP optimization software was run with a cutoff time of 10 minutes for each optimization phase (Survey-RI, and...1 RI UUV 2 PMA Vehicle Schedule Dock Deploy Move Survey RI RI PMA Figure 5: Simulated MCM Schedule. Gantt chart represents the duration of each action

  1. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1994-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  2. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July - September 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  3. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1989-06-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. Also included are a number of enforcement actions that had been previously resolved but not published in this NUREG. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  4. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1990) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. Also included are a number of enforcement actions that had been previously resolved but not published in this NUREG. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  5. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  6. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    Science.gov (United States)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  7. Schedules of controlled substances: placement of 5-methoxy-N,N-dimethyltryptamine into Schedule I of the Controlled Substances Act. Final rule.

    Science.gov (United States)

    2010-12-20

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance 5-methoxy-N,N-dimethyltryptamine (5-MeO-DMT), including its salts, isomers and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule I of the Controlled Substances Act (CSA). This action by the DEA Deputy Administrator is based on a scheduling recommendation from the Assistant Secretary for Health of the Department of Health and Human Services (DHHS) and a DEA review indicating that 5-MeO-DMT meets the criteria for placement in schedule I of the CSA. This final rule will impose the criminal sanctions and regulatory controls of schedule I substances under the CSA on the manufacture, distribution, dispensing, importation, exportation, and possession of 5-MeO-DMT.

  8. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  9. OOTW Force Design Tools

    Energy Technology Data Exchange (ETDEWEB)

    Bell, R.E.; Hartley, D.S.III; Packard, S.L.

    1999-05-01

    This report documents refined requirements for tools to aid the process of force design in Operations Other Than War (OOTWs). It recommends actions for the creation of one tool and work on other tools relating to mission planning. It also identifies the governmental agencies and commands with interests in each tool, from whom should come the user advisory groups overseeing the respective tool development activities. The understanding of OOTWs and their analytical support requirements has matured to the point where action can be taken in three areas: force design, collaborative analysis, and impact analysis. While the nature of the action and the length of time before complete results can be expected depends on the area, in each case the action should begin immediately. Force design for OOTWs is not a technically difficult process. Like force design for combat operations, it is a process of matching the capabilities of forces against the specified and implied tasks of the operation, considering the constraints of logistics, transport and force availabilities. However, there is a critical difference that restricts the usefulness of combat force design tools for OOTWs: the combat tools are built to infer non-combat capability requirements from combat capability requirements and cannot reverse the direction of the inference, as is required for OOTWs. Recently, OOTWs have played a larger role in force assessment, system effectiveness and tradeoff analysis, and concept and doctrine development and analysis. In the first Quadrennial Defense Review (QDR), each of the Services created its own OOTW force design tool. Unfortunately, the tools address different parts of the problem and do not coordinate the use of competing capabilities. These tools satisfied the immediate requirements of the QDR, but do not provide a long-term cost-effective solution.

  10. Adding Production Value Through Application of Value Based Scheduling

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    process values of both engineers and foremen on site. The questionnaire identifies relevant process values, and these are compared to values observed in the scheduling process at three construction cases. The aim is to minimize time usage in the scheduling processes and to increase robustness......Customer value is a key goal in the Lean philosophy, essentially only actions that adds value should be conducted. In a transformation view, the basic lean approach is to remove waste, which indirectly increases value (or withstand value lose). Lean Construction acknowledges two different types...... of value views. Product value, as stated above and value in relation to cooperation in the construction process. Process values are important when it comes to the comfort (physical and mental wellbeing) of the craftsmen cooperating aligned around the same goal of a smooth process and a great end product...

  11. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  12. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  13. Broadcast scheduling with data bundles

    Science.gov (United States)

    Chen, Fangfei; Pizzocaro, Diego; Johnson, Matthew P.; Bar-Noy, Amotz; Preece, Alun; La Porta, Thomas

    2011-06-01

    Broadcast scheduling has been extensively studied in wireless environments, where a base station broadcasts data to multiple users. Due to the sole wireless channel's limited bandwidth, only a subset of the needs may be satisfiable, and so maximizing total (weighted) throughput is a popular objective. In many realistic applications, however, data are dependent or correlated in the sense that the joint utility of a set of items is not simply the sum of their individual utilities. On the one hand, substitute data may provide overlapping information, so one piece of data item may have lower value if a second data item has already been delivered; on the other hand, complementary data are more valuable than the sum of their parts, if, for example, one data item is only useful in the presence of a second data item. In this paper, we define a data bundle to be a set of data items with possibly nonadditive joint utility, and we study a resulting broadcast scheduling optimization problem whose objective is to maximize the utility provided by the data delivered.

  14. Schedule optimization study implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  15. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  16. Comparison of traditional and ET-based irrigation scheduling of surface-irrigated cotton in the arid southwestern USA

    Science.gov (United States)

    The use of irrigation scheduling tools to produce cotton under-surface irrigation in the arid southwesternUSA is minimal. In the State of Arizona, where traditional irrigation scheduling is the norm, producersuse an average of 1460 mm annually to grow a cotton crop. The purpose of this paper was to ...

  17. PLANNING THE WORK OF AVIATION UNITS USING PROJECT MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Dmitry Valerievich Bogomolov

    2017-01-01

    Full Text Available The article deals with the problematic issues of planning the work of aviation units and offers one of the possible variants of their solutions by means of project management tools implementation in aviation units.As a key concept in the theory of planning, the author proposes introducing the concept of a project as a complex, non-repeating one-time action, limited in time, budget, resources and in clear guidance throughout the process, followingthe customer requirements. In aviation engineering service work, this also includes such works as operational preparationstypes, routine maintenance, aviation technology improvements, military repair etc.The use of network models can also easily specify the sequence of some of the actions (events, to make process flow charts and organizational charts.The main advantage of linear graphs is their clarity and simplicity. Linear graphs make it possible to optimize the work on a variety of criteria, including the equability of labor force, machinery, building materials, etc. At the same time,the main drawback of linear graphs is that they are difficult to correct in case of non-compliance with the deadlines or a change in their arrangement. These drawbacks are eliminated by a different form of scheduling - network charts.The scheme of planning the work of units using project management tools is given. To carry out the scheme theauthor proposes to use modern tools of project management, which allow to structure the process of maintenance activities through its decomposition into phases, tasks and subtasks, then to identify critical path tasks, construct the chart of imple- mentation. The process model as a project allows to make the prognostic analysis and to improve the process according to it, for what a number of modern software packages that automate the functions of planning and planned types of work schedule control.

  18. Modeling Enterprise Architecture Using Timed Colored PETRI Net: Single Processor Scheduling

    OpenAIRE

    Pashazadeh, Saied; Niyari, Elham Abdolrahimi

    2014-01-01

    The purpose of modeling enterprise architecture and analysis of it is to ease decision making about architecture of information systems. Planning is one of the most important tasks in an organization and has a major role in increasing the productivity of it. Scope of this paper is scheduling processes in the enterprise architecture. Scheduling is decision making on execution start time of processes that are used in manufacturing and service systems. Different methods and tools have been propo...

  19. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  20. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1990) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  1. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-08-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  2. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  3. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-07-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April-June 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  4. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-12-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  5. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-06-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  6. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  7. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1990) and includes copies of letters, notices, and orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  8. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  9. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  10. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1989-12-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  11. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  12. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  13. From customer satisfaction survey to corrective actions in laboratory services in a university hospital.

    Science.gov (United States)

    Oja, Paula I; Kouri, Timo T; Pakarinen, Arto J

    2006-12-01

    To find out the satisfaction of clinical units with laboratory services in a university hospital, to point out the most important problems and defects in services, to carry out corrective actions, and thereafter to identify the possible changes in satisfaction. and Senior physicians and nurses-in-charge of the clinical units at Oulu University Hospital, Finland. Customer satisfaction survey using a questionnaire was carried out in 2001, indicating the essential aspects of laboratory services. Customer-specific problems were clarified, corrective actions were performed, and the survey was repeated in 2004. In 2001, the highest dissatisfaction rates were recorded for computerized test requesting and reporting, turnaround times of tests, and the schedule of phlebotomy rounds. The old laboratory information system was not amenable to major improvements, and it was renewed in 2004-05. Several clinical units perceived turnaround times to be long, because the tests were ordered as routine despite emergency needs. Instructions about stat requesting were given to these units. However, no changes were evident in the satisfaction level in the 2004 survey. Following negotiations with the clinics, phlebotomy rounds were re-scheduled. This resulted in a distinct increase in satisfaction in 2004. Satisfaction survey is a screening tool that identifies topics of dissatisfaction. Without further clarifications, it is not possible to find out the specific problems of customers and to undertake targeted corrective actions. Customer-specific corrections are rarely seen as improvements in overall satisfaction rates.

  14. TIME RESERVES DURING THE ORGANISATION OF FREIGHT TRAIN MOVEMENT ON SCHEDULE

    Directory of Open Access Journals (Sweden)

    D. M. Kozachenko

    2015-03-01

    Full Text Available Purpose. The article is devoted to the development of estimation methods of time reserves that should be formed at the train schedule and the schedule for the turnover of freight trains, required to ensure the sustained interaction of technological processes of industrial enterprises and railways for the transportation of freight on schedule. Methodology. The paper considers the issues of bulk conveyance organization between industrial enterprises on schedule. In order to ensure the arrival of trains at the destination station to the specified time, the schedules of rolling stocks turnover must have some time reserves. These reserves, in their turn, should be sufficient for correction action of destabilizing factors. The methods of mathematical statistics were used to study the schedule performance quality of separate trains. Currently the movement of the main part of freight trains is performed on preparedness and occupation processes of separate schedule train paths by some depots are not fixed. Therefore, the analyses of the schedule performance of freight trains do not allow receiving the material for research. And, due to the lack of statistical material on the punctuality of the schedule for the movement of freight trains, research of the passenger trains movement with subsequent dissemination of results on freight movement were carried out by the authors. Findings. The research proved that the trains arrival at the destination station according to the schedule should be ensured by permissible rating of delay as well as increase the operating time of trains and running intervals. The values of the additional time reserves that should be included in the schedule of trains, and the schedule for the turnover of freight trains to provide conditional interaction of railroads and industrial enterprises in Ukraine were proposed. Originality. On the basis of the research development graph methods of trains turnover, providing transportation of

  15. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  16. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  17. The delivery commitment schedule process

    International Nuclear Information System (INIS)

    Vance, S.A.

    1991-01-01

    The Standard Contract for the Disposal of Spent Nuclear Fuel (SNF) and/or High-Level Radioactive Waste (HLW) (herein referred to as the Contract) tasked the U.S. Department of Energy (DOE) with the development of a transportation system adequate to service both utilities and the waste management system (WMS). Due to the nature of the Contract, this development must take place prior to the utilities' final determination of the specific SNF that they will deliver during each allocation period. The Delivery Commitment Schedule (DCS) process is designed to initiate the identification of the SNF that will be delivered at a given time in order to aid in the development of the transportation system

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  19. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  20. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and discontinuous flow of resources. Alternative scheduling techniques, often called repetitive or linear...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  1. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  2. O enfermeiro como instrumento de ação no cuidar do idoso El enfermero como instrumento de accion en el cuidado del anciano The nurse as an action tool in care for the aged

    Directory of Open Access Journals (Sweden)

    Ana Karine Ramos Brum

    2005-12-01

    enfrentamiento de la situación vivida. El estudio permitió señalar algunas contribuciones para las áreas del cuidado, la atención, la docencia y la investigación, contemplando la actitud del enfermero como instrumento de acción en el cuidado del anciano.This study approaches nursing care as related to the aged. The studied situation involved health care needs of hospitalized persons, using the following central question: which is the meaning of nurses' actions when attending hospitalized aged patients without expectation of recovery and when technology is no longer that important? We aimed to reflect about hospitalized elders' needs in nursing reality. Comprehensive Sociology was used as a theoretical-methodological framework. The study was carried out at an Intensive Care Service of a Municipal Hospital in the city of Rio de Janeiro - Brazil. The subjects were nurses who attend hospitalized aged persons without any expectation of recovery, who were approached through a phenomenological interview. Through a comprehensive analysis, we identified care by being together, providing at the same time physical comfort and well-being to cope with the situation as typical of nursing actions. This study indicates some contributions for nursing care, assistance, teaching and research, aimed at strengthening nurses' attitude as an action tool in care for aged patients.

  3. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  4. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors

    OpenAIRE

    Zilanawala, A.

    2017-01-01

    Objectives: Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9–5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Co...

  5. Scheduling and Communication Synthesis for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul

    2000-01-01

    Embedded systems are now omnipresent: from cellular phones to pagers, from microwave ovens to PDAs, almost all the devices we use are controlled by embedded systems. Many embedded systems have to fulfill strict requirements in terms of performance and cost efficiency. Emerging designs are usually...... based on heterogeneous architectures that integrate multiple programmable processors and dedicated hardware components. New tools which extend design automation to system level have to support the integrated design of both the hardware and software components of such systems. This thesis concentrates...... on aspects of scheduling and communication for embedded real-time systems. Special emphasis has been placed on the impact of the communication infrastructure and protocol on the overall system performance. The scheduling and communication strategies proposed are based on an abstract graph representation...

  6. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  7. A New Software for Management, Scheduling, and Optimization for the Light Hydrocarbon Pipeline Network System of Daqing Oilfield

    Directory of Open Access Journals (Sweden)

    Yongtu Liang

    2014-01-01

    Full Text Available This paper presents the new software which specifically developed based on Visual Studio 2010 for Daqing Oilfield China includes the most complex light hydrocarbon pipeline network system in Asia, has become a powerful auxiliary tool to manage field data, makes scheduling plans for batching operation, and optimizes pumping plans. Firstly, DMM for recording and managing field data is summarized. Then, the batch scheduling simulation module called SSM for the difficult batch-scheduling issues of the multiple-source pipeline network system is introduced. Finally, SOM, that is Scheduling Optimization Module, is indicated for solving the problem of the pumps being started up/shut-down frequently.

  8. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  9. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  10. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  11. SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

    Science.gov (United States)

    Frank, Jeremy

    2005-01-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can

  12. From talk to action: what performance improvement is really all about.

    Science.gov (United States)

    Newmark, Jason

    2007-01-01

    In today's ever increasingly competitive healthcare environment, our customers are demanding more efficient, easily accessible, and high quality service, and we are being asked to do more and more with oftentimes limited resources. As such, continually evaluating our department's operations, identifying opportunities for improvement, and commencing upon improvement initiatives is essential for an organization, and an administrator, to be successful. This article presents a "call to action" for the initiation of on-going performonce improvement efforts, and provides an overview of sample tools and strategies necessary to both identify opportunities for improvement and develop effective strategies to accomplish them. In addition, best practices for obtaining substantial financial and customer satisfaction data, as well as specific tools to engage stakeholders (management, staff, physicians, and so on) in achieving performance improvement success, are discussed. For clarity, a case study focusing on successful improvement initiatives with a central scheduling office will be presented.

  13. Optimal Day-ahead Charging Scheduling of Electric Vehicles through an Aggregative Game Model

    DEFF Research Database (Denmark)

    Liu, Zhaoxi; Wu, Qiuwei; Huang, Shaojun

    2017-01-01

    The electric vehicle (EV) market has been growing rapidly around the world. With large scale deployment of EVs in power systems, both the grid and EV owners will benefit if the flexible demand of EV charging is properly managed through the electricity market. When EV charging demand is considerable...... in a grid, it will impact spot prices in the electricity market and consequently influence the charging scheduling itself. The interaction between the spot prices and the EV demand needs to be considered in the EV charging scheduling, otherwise it will lead to a higher charging cost. A day-ahead EV charging...... scheduling based on an aggregative game model is proposed in this paper. The impacts of the EV demand on the electricity prices are formulated with the game model in the scheduling considering possible actions of other EVs. The existence and uniqueness of the pure strategy Nash equilibrium are proved...

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  15. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Braaksma, Aleida; Vliegen, Ingrid M.H.; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  16. Incremental Scheduling Engines: Cost Savings through Automation

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  17. Appointment scheduling with unscheduled arrivals and reprioritization

    NARCIS (Netherlands)

    Borgman, Nardo J.; Vliegen, Ingrid M.H.; Boucherie, Richard J.; Hans, Erwin W.

    2017-01-01

    Inspired by the real life problem of a radiology department in a Dutch hospital, we study the problem of scheduling appointments, taking into account unscheduled arrivals and reprioritization. The radiology department offers CT diagnostics to both scheduled and unscheduled patients. Of these

  18. Stochastic Online Scheduling on Unrelated Machines

    NARCIS (Netherlands)

    Gupta, Varun; Moseley, Benjamin; Uetz, Marc Jochen; Xie, Qiaomin

    2016-01-01

    We derive the first performance guarantees for a combinatorial online algorithm that schedules stochastic, nonpreemptive jobs on unrelated machines to minimize the expectation of the total weighted completion time. Prior work on unrelated machine scheduling with stochastic jobs was restricted to the

  19. A question of matching rather than scheduling

    NARCIS (Netherlands)

    van de Velde, S.L.

    1995-01-01

    Proper scheduling maintenance for Air Force C-130 aircraft involves the prevention of mismatches concerning the availability of the aircraft and a new wing kit which would prolong its use. Scheduling maintenance problems include the designation of wing kits in the production sequence to match for a

  20. Scheduling parameters in flexible manufacturing cells

    NARCIS (Netherlands)

    Slomp, J.; Gaalman, G.J.C.; Ahmad, M.M.; Sullivan, W.G.; Migliore, H.; Randhawa, S.

    1998-01-01

    The existence of a well-designed scheduling procedure is a major condition for an effective integration of a flexible manufacturing cell (FMC) in the material flow of a firm. This paper shows the presence and relative importance of three parameter types in the scheduling of operations on a flexible

  1. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  2. A Case Against Periodic Jukebox Scheduling

    NARCIS (Netherlands)

    Lijding, M.E.M.; Hanssen, F.T.Y.; Jansen, P.G.

    This paper presents the jukebox early quantum scheduler (JEQS). JEQS is a periodic jukebox scheduler for a Video-on-Demand system. JEQS uses the jukebox robots in a cyclic way and the time is divided in constant units called quanta. A quantum is the maximum time needed to unload and load all the

  3. Crew Scheduling for Netherlands Railways: "destination: customer"

    NARCIS (Netherlands)

    L.G. Kroon (Leo); M. Fischetti (Matteo)

    2000-01-01

    textabstract: In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer"

  4. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    The method is capable of stating the overhaul frequency of each machine within this time period. For convenience in the formulation of the model, maintenance schedule was divided into two parts, namely minor and major maintenance schedules. During a minor maintenance, an individual machine is checked and reset, ...

  5. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-01-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes cost and schedule data through June 1989

  6. A Heuristic Approach to Scheduling University Timetables.

    Science.gov (United States)

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  7. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  8. Unrelated Machine Scheduling with Stochastic Processing Times

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the processing times of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated

  9. Machine scheduling with resource dependent processing times

    NARCIS (Netherlands)

    Grigoriev, A.; Sviridenko, M.; Uetz, Marc Jochen

    We consider machine scheduling on unrelated parallel machines with the objective to minimize the schedule makespan. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a discrete renewable resource, e.g. workers. A given amount of that

  10. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  11. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  12. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  13. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Document Server

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  14. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  15. Elements of social action

    Directory of Open Access Journals (Sweden)

    Marjanović Miloš

    2011-01-01

    Full Text Available Because of the significant analytical advantages, the author prefers social action as initial sociological concept in the relation to social phenomenon. Its basic elements are: actors, subjects and tools, needs and interests, values and norms, positions and roles. Actors set in motion and unify the rest of elements, guide to the magic triangle of sociology (movement, change, order, reaffirm actor paradigm to systemic paradigm. Subjects and tools materialize an action and its overestimate results in technological determinism or (by means of property as institutional appropriation of nature in the (unclassed historical type of society. Needs and interests are the basis of person's motivation and starting point for depth analysis of sociability. The expansion of legitimate interests circle develops techniques of normative regulation. Values and norms guide to institutional-organizational, positions to vertical and roles to horizontal structure. Values give the meaning to the action as well as to human existence, they are orientations of motivate system of personality but also basic aspect of society. As abstractions, values are latent background of norms and they tell to us what to do, and norms how to do something. Norms are specified instructions for suitable behavior Without normative order, not to be possible the satisfying of needs and the conciliation of interests. Riches, power and prestige are components of social position, and legal status is the determination of rights and obligations of the position. Roles are normative expectation of behavior. Toward kinds of sanctions roles are classified. Roles but also other elements of social action are starting point for sociological analysis of legal norms and institutes. On the other side, the observation of legal component of social actions enriches, strengths and precises sociological analysis of them.

  16. 5 CFR 2472.11 - Final action by the Panel.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Final action by the Panel. 2472.11... LABOR RELATIONS AUTHORITY AND FEDERAL SERVICE IMPASSES PANEL FEDERAL SERVICE IMPASSES PANEL IMPASSES... SCHEDULES Procedures of the Panel § 2472.11 Final action by the Panel. (a) After due consideration of the...

  17. 75 FR 33445 - U.S. Citizenship and Immigration Services Fee Schedule

    Science.gov (United States)

    2010-06-11

    ... Part IV Department of Homeland Security 8 CFR Parts 103, 204, 244, et al. U.S. Citizenship and..., and 274A [CIS No. 2490-09; DHS Docket No. USCIS-2009-0033] RIN 1615-AB80 U.S. Citizenship and Immigration Services Fee Schedule AGENCY: U.S. Citizenship and Immigration Services, DHS. ACTION: Proposed...

  18. 75 FR 69851 - U.S. Citizenship and Immigration Services Fee Schedule; Correction

    Science.gov (United States)

    2010-11-16

    ...] RIN 1615-AB80 U.S. Citizenship and Immigration Services Fee Schedule; Correction AGENCY: U.S. Citizenship and Immigration Services, DHS. ACTION: Final rule; correction. SUMMARY: The Department of Homeland Security corrects an inadvertent error in the amendatory language of the final rule U.S. Citizenship and...

  19. 77 FR 27009 - Schedule for Rating Disabilities; The Digestive System; Withdrawal

    Science.gov (United States)

    2012-05-08

    ... Digestive System; Withdrawal AGENCY: Department of Veterans Affairs. ACTION: Proposed rule; withdrawal... science related to the digestive system. Therefore, the proposed rule is in part based upon outdated and... to revise and update the Schedule for Rating Disabilities (VASRD) that addresses the digestive system...

  20. Improved utilization and responsiveness with gang scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Feitelson, D.G., [Institute of Computer Science, The Hebrew University of Jerusalem (IsraelL); Jette, M.A. [Lawrence Livermore National Lab., CA (United States)

    1996-10-01

    Most commercial multicomputers use space-slicing schemes in which each scheduling decision has an unknown impact on the future: should a job be scheduled, risking that it will block other larger jobs later, or should the processors be left idle for now in anticipation of future arrivals? This dilemma is solved by using gang scheduling, because then the impact of each decision is limited to its time slice, and future arrivals can be accommodated in other time slices. This added flexibility is shown to improve overall system utilization and responsiveness. Empirical evidence from using gang scheduling on a Cray T3D installed at Lawrence Livermore National Lab corroborates these results, and shows conclusively that gang scheduling can be very effective with current technology. 29 refs., 10 figs., 6 tabs.

  1. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  2. Social Data Analytics Tool

    DEFF Research Database (Denmark)

    Hussain, Abid; Vatrapu, Ravi

    2014-01-01

    This paper presents the design, development and demonstrative case studies of the Social Data Analytics Tool, SODATO. Adopting Action Design Framework [1], the objective of SODATO [2] is to collect, store, analyze, and report big social data emanating from the social media engagement of and socia...

  3. Integrating and scheduling an open set of static analyses

    DEFF Research Database (Denmark)

    Eichberg, Michael; Mezini, Mira; Kloppenburg, Sven

    2006-01-01

    To improve the productivity of the development process, more and more tools for static software analysis are tightly integrated into the incremental build process of an IDE. If multiple interdependent analyses are used simultaneously, the coordination between the analyses becomes a major obstacle...... to keep the set of analyses open. We propose an approach to integrating and scheduling an open set of static analyses which decouples the individual analyses and coordinates the analysis executions such that the overall time and space consumption is minimized. The approach has been implemented...

  4. Alternative schedules of levothyroxine administration.

    Science.gov (United States)

    Geer, Melanie; Potter, Donald Mark; Ulrich, Heather

    2015-03-01

    Published evidence on bedtime versus prebreakfast administration of levothyroxine is reviewed. Because levothyroxine absorption has been shown to increase when the drug is administered to patients in a fasted state, the standard recommendation is that levothyroxine be taken one half to one hour prior to breakfast and at least four hours before or after potentially interacting drugs. However, compliance with this recommendation may be problematic for patients with unpredictable or variable schedules. A literature search identified four published studies of bedtime levothyroxine dosing. Two of the studies demonstrated a significant decrease in levels of thyroid-stimulating hormone (TSH) with levothyroxine administration at bedtime versus 30 minutes before breakfast, one study showed an increase in TSH when levothyroxine was taken at bedtime versus one hour before breakfast, and one study found no significant differences in TSH levels or other thyroid function monitoring limitations with bedtime versus standard dosing in subjects naive to levothyroxine therapy. The inconsistent study findings may be attributable to a number of variables, including dietary differences among the study populations, the use of potentially interacting supplements in one study, and variable intervals between levothyroxine administration and food intake. Neither dosing method correlated with substantial changes in assessments of quality of life or symptom severity; in two of the studies, patients indicated a preference for bedtime levothyroxine administration. Based on the available literature, bedtime administration of levothyroxine is an option for patients with hypothyroidism who want to avoid taking their medication with food. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  5. A Scheduling Algorithm for Cloud Computing System Based on the Driver of Dynamic Essential Path.

    Science.gov (United States)

    Xie, Zhiqiang; Shao, Xia; Xin, Yu

    2016-01-01

    To solve the problem of task scheduling in the cloud computing system, this paper proposes a scheduling algorithm for cloud computing based on the driver of dynamic essential path (DDEP). This algorithm applies a predecessor-task layer priority strategy to solve the problem of constraint relations among task nodes. The strategy assigns different priority values to every task node based on the scheduling order of task node as affected by the constraint relations among task nodes, and the task node list is generated by the different priority value. To address the scheduling order problem in which task nodes have the same priority value, the dynamic essential long path strategy is proposed. This strategy computes the dynamic essential path of the pre-scheduling task nodes based on the actual computation cost and communication cost of task node in the scheduling process. The task node that has the longest dynamic essential path is scheduled first as the completion time of task graph is indirectly influenced by the finishing time of task nodes in the longest dynamic essential path. Finally, we demonstrate the proposed algorithm via simulation experiments using Matlab tools. The experimental results indicate that the proposed algorithm can effectively reduce the task Makespan in most cases and meet a high quality performance objective.

  6. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  7. Solving Flexible Job-Shop Scheduling Problem Using Gravitational Search Algorithm and Colored Petri Net

    Directory of Open Access Journals (Sweden)

    Behnam Barzegar

    2012-01-01

    Full Text Available Scheduled production system leads to avoiding stock accumulations, losses reduction, decreasing or even eliminating idol machines, and effort to better benefitting from machines for on time responding customer orders and supplying requested materials in suitable time. In flexible job-shop scheduling production systems, we could reduce time and costs by transferring and delivering operations on existing machines, that is, among NP-hard problems. The scheduling objective minimizes the maximal completion time of all the operations, which is denoted by Makespan. Different methods and algorithms have been presented for solving this problem. Having a reasonable scheduled production system has significant influence on improving effectiveness and attaining to organization goals. In this paper, new algorithm were proposed for flexible job-shop scheduling problem systems (FJSSP-GSPN that is based on gravitational search algorithm (GSA. In the proposed method, the flexible job-shop scheduling problem systems was modeled by color Petri net and CPN tool and then a scheduled job was programmed by GSA algorithm. The experimental results showed that the proposed method has reasonable performance in comparison with other algorithms.

  8. Computer-based irrigation scheduling for cotton crop

    International Nuclear Information System (INIS)

    Laghari, K.Q.; Memon, H.M.

    2008-01-01

    In this study a real time irrigation schedule for cotton crop has been tested using mehran model, a computer-based DDS (Decision Support System). The irrigation schedule was set on selected MAD (Management Allowable Depletion) and the current root depth position. The total 451 mm irrigation water applied to the crop field. The seasonal computed crop ET (Evapotranspiration) was estimated 421.32 mm and actual (ET/sub ca/) observed was 413 mm. The model over-estimated seasonal ET by only 1.94. WUE (Water Use Efficiency) for seed-cotton achieved 6.59 Kg (ha mm)/sup -1/. The statistical analysis (R/sup 2/=0.96, ARE%=2.00, T-1.17 and F=550.57) showed good performance of the model in simulated and observed ET values. The designed Mehran model is designed quite versatile for irrigation scheduling and can be successfully used as irrigation DSS tool for various crop types. (author)

  9. Gain Scheduling for the Orion Launch Abort Vehicle Controller

    Science.gov (United States)

    McNamara, Sara J.; Restrepo, Carolina I.; Madsen, Jennifer M.; Medina, Edgar A.; Proud, Ryan W.; Whitley, Ryan J.

    2011-01-01

    One of NASAs challenges for the Orion vehicle is the control system design for the Launch Abort Vehicle (LAV), which is required to abort safely at any time during the atmospheric ascent portion of ight. The focus of this paper is the gain design and scheduling process for a controller that covers the wide range of vehicle configurations and flight conditions experienced during the full envelope of potential abort trajectories from the pad to exo-atmospheric flight. Several factors are taken into account in the automation process for tuning the gains including the abort effectors, the environmental changes and the autopilot modes. Gain scheduling is accomplished using a linear quadratic regulator (LQR) approach for the decoupled, simplified linear model throughout the operational envelope in time, altitude and Mach number. The derived gains are then implemented into the full linear model for controller requirement validation. Finally, the gains are tested and evaluated in a non-linear simulation using the vehicles ight software to ensure performance requirements are met. An overview of the LAV controller design and a description of the linear plant models are presented. Examples of the most significant challenges with the automation of the gain tuning process are then discussed. In conclusion, the paper will consider the lessons learned through out the process, especially in regards to automation, and examine the usefulness of the gain scheduling tool and process developed as applicable to non-Orion vehicles.

  10. Microcomputer-based vehicle routing and scheduling: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Klein, A.J.

    1987-08-01

    Commercially available vehicle-routing and scheduling packages were surveyed to assess capabilities, categorize key characteristics, compare individual packages, and select candidate software for additional testing. Among the key characteristics addressed were backhauling, distance and vehicle travel-time calculation, geocoding, speed zones, natural barriers, time-window constraints, vehicle/stop matching constraints, and other constraints such as vehicle/driver operating costs. The survey included review of vendor literature, telephone interviews, site visits to review software, and the testing of demonstration packages on a set of sample distribution networks. Thirteen packages were reviewed; these were categorized by price and performance as follows; (1) inexpensive packages (costing $2000 or less), which solve the basic vehicle-routing problem but are somewhat limited in their ability to handle large numbers of vehicles and stops; (2) medium-priced systems (from $5000 to $20,000), which offer more capability to handle constraints such as multiple pickup and delivery, time windows, and multiple depots and provide manual intervention capability and enhanced graphics; (3) very expensive systems (from $50,000 to about $150,000), which can handle real-time situations in scheduling last-minute route changes and employ sophisticated graphics tools to change route schedules interactively. Out of the 13 packages, four demonstration vehicle-routing packages were obtained for testing of 4 sample networks; two of the packages were found to be capable of solving most vehicle-routing problem constraints for two versions of 21-city and 30-city networks.

  11. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  12. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  13. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  14. Using icons to convey medication schedule information.

    Science.gov (United States)

    Morrow, D G; Leirer, V O; Andrassy, J M

    1996-08-01

    We examined older adult comprehension and memory for medication schedules conveyed by different types of visual icons as well as text. Three icons were compared: a timeline, a pair of 12 h clocks (one for AM and one for PM hours) and a 24 h clock. In Experiment 1, older and younger participants paraphrased and then recalled schedules that were conveyed by the three icons or by text. Text and timeline schedules were paraphrased more accurately than either clock icon. Paraphrase errors suggested that subjects had trouble integrating schedule information across the two 12 h clocks. Analysis of paraphrase times showed that the text schedule was paraphrased most quickly, followed by the timeline, the 24 h clock and the 12 h clock. No differences were found for the accuracy of recalling the icon and text schedules. Experiment 2 examined free and cued recall after limited study time by older adults. Because text superiority in Experiment 1 may have reflected greater familiarity with text than with icons, recall was examined across four trials in Experiment 2. Text was recalled most accurately, followed by the timeline, the 24 h clock and the 12 h clock. Study-test trials did not influence recall. Text schedules may have been generally more effective than the icons because of their greater familiarity. The timeline may have been the most effective icon because it was more compact and familiar than the clock icons used in the study. The findings suggest that including such icons in medication instructions requires training.

  15. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  16. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    optimality of the dynamic programming solution for single satellites was within 10%, and find up to 5% more optimal solutions. The optimality gap for constellations was found to be 22% at worst, but the dynamic programming schedules were found at nearly four orders of magnitude better computational speed than integer programming. The algorithm can include cloud cover predictions, ground downlink windows or any other spatial, temporal or angular constraints into the orbital module and be integrated into planning tools for agile constellations.

  17. Is credit for early action credible early action?

    International Nuclear Information System (INIS)

    Rolfe, C.; Michaelowa, A.; Dutschke, M.

    1999-12-01

    Credit for early action as a tool for greenhouse gas emissions reduction is compared with various market instruments as a means of narrowing the gap between projected emissions and those of the Kyoto Protocol. Market instruments work by creating a market price for emissions and use the market to encourage reductions at the lowest price, which is done by placing limits on greenhouse gas emissions and allowing the market to decide where reductions occur, or by imposing a carbon tax or emissions charge. While they can be applied within a sector, they are usually used to encourage reductions throughout the economy or across large sectors. Credit for early action also creates an incentive for emissions reductions throughout the economy or at least across many sectors. Credit for early action tools do not work by either imposing a carbon tax or emissions charge or placing limits on emissions, rather they promise that entities that take action against greenhouse gases prior to the imposition of a carbon tax or emissions limits will receive a credit against future taxes or limits. An overview is provided of the Kyoto Protocol and the rationale for taking early action, and a review is included of the theory and specific proposals for market instruments and credit for early action. A comparative analysis is provided of these approaches by examining their relative efficiency, environmental effectiveness, and impacts on the redistribution of wealth. Credit for early action is viewed as problematic on a number of counts and is seen as an interim strategy for imposition while political support for market instruments develop. The environmental effectiveness of credit for early action is very difficult to predict, and credit for early action programs do not yield the lowest cost emissions reductions. Credit for early action programs will not achieve compliance with the Kyoto Protocol at the lowest cost, and credits for early action will increase the compliance costs for those who

  18. Scheduling participants of Assessment Centres

    DEFF Research Database (Denmark)

    Lysgaard, Jens; Løber, Janni

      Assessment Centres are used as a tool for psychologists and coaches to observe a number of dimensions in a person's behaviour and test his/her potential within a number of chosen focus areas. This is done in an intense course, with a number of different exercises which expose each participant......'s ability level in the chosen focus areas. The participants are observed by assessors with the purpose of gathering material for reaching a conclusion on each participant's personal profile. We consider the particular case that arises at the company Human Equity (www.humanequity.dk), where Assessment...

  19. NEWS OF THE NATIONAL IMMUNIZATION SCHEDULE

    Directory of Open Access Journals (Sweden)

    O. V. Shamsheva

    2014-01-01

    Full Text Available The article presents the changes Immunization Schedule Russia introduced in 2014. In new Schedule now is the vaccination against pneumococcal disease for all children of 2 months with revaccination at 4 and 15 months old; excluded from the Schedule second revaccination against tuberculosis. At risk groups to be vaccinated against the flu, entered pregnant women and persons subject to military conscription. Recommendations on use of vaccines containing relevant antigens for the Russian Federation, to provide maximum effectiveness of immunization and vaccines that do not contain preservatives in children under 1 year of age. Offered to create a council of experts in the field of vaccinology and vaccine prevention

  20. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...... in terms of their advanced ability to perform tasks at machines by using their manipulation arms. The mobile robots thus have to be scheduled in relation to scheduling of machines so as to increase the efficiency of the overall system. The performance criterion is to minimize time required to complete all...

  1. Starshade Observation Scheduling for WFIRST

    Science.gov (United States)

    Soto, Gabriel; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    An exoplanet direct imaging mission can employ an external starshade for starlight suppression to achieve higher contrasts and potentially higher throughput than with an internal coronagraph. This separately-launched starshade spacecraft is assumed to maintain a single, constant separation distance from the space telescope—for this study, the Wide Field Infrared Survey Telescope (WFIRST)—based on a designated inner working angle during integration times. The science yield of such a mission can be quantified using the Exoplanet Open-Source Imaging Simulator (EXOSIMS): this simulator determines the distributions of mission outcomes, such as the types and amount of exoplanet detections, based on ensembles of end-to-end simulations of the mission. This study adds a starshade class to the survey simulation module of EXOSIMS and outlines a method for efficiently determining observation schedules. The new starshade class solves boundary value problems using circular restricted three-body dynamics to find fast, high-accuracy estimates of the starshade motion while repositioning between WFIRST observations. Fuel usage dictates the mission lifetime of the starshade given its limited fuel supply and is dominated by the Δv used to reposition the starshade between the LOS of different targets; the repositioning time-of-flight is kept constant in this study. A starshade burns less fuel to reach certain target stars based on their relative projected positions on a skymap; other targets with costly transfers can be filtered out to increase the starshade mission duration. Because the initial target list can consist of nearly 2000 stars, calculating the Δv required to move the starshade to every other star on the target list would be too computationally expensive and renders running ensembles of survey simulations infeasible. Assuming the starshade begins its transfer at the LOS of a certain star, a Δv curve is approximated for the remaining target stars based on their right

  2. New tool for integration of wind power forecasting into power system operation

    DEFF Research Database (Denmark)

    Gubina, Andrej F.; Keane, Andrew; Meibom, Peter

    2009-01-01

    The paper describes the methodology that has been developed for transmission system operators (TSOs) of Republic of Ireland, Eirgrid, and Northern Ireland, SONI the TSO in Northern Ireland, to study the effects of advanced wind power forecasting on optimal short-term power system scheduling...... for evaluation of the impacts that different types of wind energy forecasts (stochastic vs. deterministic vs. perfect) have on the schedules, and how the new incoming information via in-day scheduling impacts the quality of the schedules. Within the methodology, metrics to assess the quality of the schedules....... The resulting schedules take into account the electricity market conditions and feature optimal reserve scheduling. The short-term wind power prediction is provided by the Anemos tool, and the scheduling function, including the reserve optimisation, by the Wilmar tool. The proposed methodology allows...

  3. Operational Excellence through Schedule Optimization and Production Simulation of Application Specific Integrated Circuits.

    Energy Technology Data Exchange (ETDEWEB)

    Flory, John Andrew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Padilla, Denise D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gauthier, John H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Zwerneman, April Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Miller, Steven P [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performance evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.

  4. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  5. Web Audio/Video Streaming Tool

    Science.gov (United States)

    Guruvadoo, Eranna K.

    2003-01-01

    In order to promote NASA-wide educational outreach program to educate and inform the public of space exploration, NASA, at Kennedy Space Center, is seeking efficient ways to add more contents to the web by streaming audio/video files. This project proposes a high level overview of a framework for the creation, management, and scheduling of audio/video assets over the web. To support short-term goals, the prototype of a web-based tool is designed and demonstrated to automate the process of streaming audio/video files. The tool provides web-enabled users interfaces to manage video assets, create publishable schedules of video assets for streaming, and schedule the streaming events. These operations are performed on user-defined and system-derived metadata of audio/video assets stored in a relational database while the assets reside on separate repository. The prototype tool is designed using ColdFusion 5.0.

  6. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  7. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  8. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and patients. Cancellation ... management. High cancellation rates may indicate that rare health resources are being used ineffectively, thereby increasing costs. There are many reasons for surgery cancellation including.

  9. Dynamical model for retrieval of tram schedule

    Science.gov (United States)

    Nagatani, Takashi

    2007-04-01

    We present the dynamical model for retrieval of a tram schedule when trams arrive at stops slower or faster than the schedule. Trams speed up or stop shorter to retrieve the delay. The dynamics of the trams is expressed in terms of the nonlinear maps. We study the dynamical behavior of trams when they control the speed and stopping time to retrieve the schedule. The arrival times of trams exhibit the complex behavior with varying trips. The trams show the periodic and irregular (chaotic) motions even if there are no noises. The tram chaos is controlled by varying both stopping time and degree of speedup. The tram schedule is connected with the complex motions of trams. The region map (phase diagram) is shown to control the complex motions of trams.

  10. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  11. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  12. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  13. Strategic Gang Scheduling for Railroad Maintenance

    Science.gov (United States)

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  14. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  15. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  16. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  17. 40 CFR 52.626 - Compliance schedules.

    Science.gov (United States)

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The.... Source Location Regulation sections involved Date of adoption Nanakuli Paving & Rock Co., Ltd Molokai 8...

  18. Schedule of average annual equipment ownership expense

    Science.gov (United States)

    2003-03-06

    The "Schedule of Average Annual Equipment Ownership Expense" is designed for use on Force Account bills of Contractors performing work for the Illinois Department of Transportation and local government agencies who choose to adopt these rates. This s...

  19. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  20. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  1. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  2. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  3. Automated scheduler improvements and generalizations for the Automated Planet Finder

    Science.gov (United States)

    Holden, Bradford P.; Burt, Jennifer A.; Deich, William T. S.

    2016-07-01

    The Automated Planet Finder (APF) was originally designed as a single purpose facility to search for exoplanets. The APF, however, has become a general use observatory that is used by astronomers the world over. We describe the improvements to our software for operations that both optimize finding planets with known periods and supporting a much broader community of astronomers with a variety of interests and requirements. These include a variety of observing modes beyond the originally envisioned fixed target lists, such as time dependent priorities to meet the needs of rapid varying targets, and improved tools for simulating observing cadence for the planet hunting teams. We discuss the underlying software for the APF, illustrating why its simplicity of use allows users to write software that focuses on scientific productivity. Because of this simplicity, we can then develop scheduling software, which is easily integrated into the APF operations suite. We test these new scheduling modes using a nightly simulator which uses historical weather and seeing data. After discussing this new simulation tool, we measure how well the methods work after a 36 month simulated campaign to follow-up transiting targets. We find that the data yield of each of the tested schemes is similar. Therefore, we can focus on the best potential scientific return with little concern about the impact on the number or duration of observations.

  4. Action Learning: Avoiding Conflict or Enabling Action

    Science.gov (United States)

    Corley, Aileen; Thorne, Ann

    2006-01-01

    Action learning is based on the premise that action and learning are inextricably entwined and it is this potential, to enable action, which has contributed to the growth of action learning within education and management development programmes. However has this growth in action learning lead to an evolution or a dilution of Revan's classical…

  5. Maximizing System Lifetime by Battery Scheduling

    OpenAIRE

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the system lifetime. Straightforward scheduling schemes, like round robin or choosing the best battery available, already provide a big improvement compared to a sequential discharge of the batteries. ...

  6. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  7. A Program Master Schedule Can Improve Results

    Science.gov (United States)

    2014-02-01

    briefings, so PMOs often rely on static pictures and Gantt charts available on presentation software such as Microsoft PowerPoint. That’s fine—and...dependencies, current status and individual forecasts to be overlaid and projected in a program context. Commercial scheduling software is...uniquely capable of doing this in re- peatable and reliable fashion. However, scheduling software doesn’t always produce the “pretty” pictures preferred for

  8. Drug discrimination under a concurrent schedule.

    OpenAIRE

    Snodgrass, S H; McMillan, D E

    1996-01-01

    Three pigeons were trained to discriminate a 5.0 mg/kg dose of pentobarbital from saline under a two-key concurrent schedule with responding on the key associated with the presession injection, under both stimulus conditions, producing four times as many reinforcers as responding on the other key. This concurrent schedule resulted in approximately 70% responding to the higher reinforcement key under the pentobarbital stimulus and approximately 30% responding to that key under the saline stimu...

  9. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  10. Spiking Neural P Systems With Scheduled Synapses.

    Science.gov (United States)

    Cabarle, Francis George C; Adorna, Henry N; Jiang, Min; Zeng, Xiangxiang

    2017-12-01

    Spiking neural P systems (SN P systems) are models of computation inspired by biological spiking neurons. SN P systems have neurons as spike processors, which are placed on the nodes of a directed and static graph (the edges in the graph are the synapses). In this paper, we introduce a variant called SN P systems with scheduled synapses (SSN P systems). SSN P systems are inspired and motivated by the structural dynamism of biological synapses, while incorporating ideas from nonstatic (i.e., dynamic) graphs and networks. In particular, synapses in SSN P systems are available only at specific durations according to their schedules. The SSN P systems model is a response to the problem of introducing durations to synapses of SN P systems. Since SN P systems are in essence static graphs, it is natural to consider them for dynamic graphs also. We introduce local and global schedule types, also taking inspiration from the above-mentioned sources. We prove that SSN P systems are computationally universal as number generators and acceptors for both schedule types, under a normal form (i.e., a simplifying set of restrictions). The introduction of synapse schedules for either schedule type proves useful in programming the system, despite restrictions in the normal form.

  11. Reliability Generalization: An Examination of the Positive Affect and Negative Affect Schedule

    Science.gov (United States)

    Leue, Anja; Lange, Sebastian

    2011-01-01

    The assessment of positive affect (PA) and negative affect (NA) by means of the Positive Affect and Negative Affect Schedule has received a remarkable popularity in the social sciences. Using a meta-analytic tool--namely, reliability generalization (RG)--population reliability scores of both scales have been investigated on the basis of a random…

  12. Optimal Usage of Multiple Energy Carriers in Residential Systems : Unit Scheduling and Power Control

    NARCIS (Netherlands)

    Ramirez-Elizondo, L.M.

    2013-01-01

    The world’s increasing energy demand and growing environmental concerns have motivated scientists to develop new technologies and methods to make better use of the remaining resources of our planet. The main objective of this dissertation is to develop a scheduling and control tool at the district

  13. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  14. Talent Management: Emphasis on Action

    Science.gov (United States)

    Butterfield, Barbara

    2008-01-01

    Recent discussions among HR practitioners in higher education have focused on talent management; specifically, the concept of developing a college or university talent management approach balanced between planning and action. Talent management as a planning tool looks very similar to workforce planning, but where HR will experience a real…

  15. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  16. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  17. Machine tool

    International Nuclear Information System (INIS)

    Kang, Myeong Sun

    1981-01-01

    This book indicates machine tool, which includes cutting process and processing by cutting process, theory of cutting like tool angle and chip molding, cutting tool such as milling cutter and drill, summary and introduction of following machine ; spindle drive and feed drive, pivot and pivot bearing, frame, guide way and table, drilling machine, boring machine, shaper and planer, milling machine, machine tool for precision finishing like lapping machine and super finishing machine gear cutter.

  18. Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

    Science.gov (United States)

    Chou, Hui-Yu; Yang, Jyh-Bin

    2017-10-01

    The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

  19. How do I revise my agent’s action theory?

    CSIR Research Space (South Africa)

    Varzinczak, IJ

    2009-06-01

    Full Text Available Logical theories in reasoning about actions may also evolve and knowledge engineers need revision tools to incorporate new incoming laws about the dynamic environment. Researchers here fill this gap by providing an algorithmic approach for action...

  20. Collaborative writing: Tools and tips

    Directory of Open Access Journals (Sweden)

    Eapen Bell

    2007-01-01

    Full Text Available Majority of technical writing is done by groups of experts and various web based applications have made this collaboration easy. Email exchange of word processor documents with tracked changes used to be the standard technique for collaborative writing. However web based tools like Google docs and Spreadsheets have made the process fast and efficient. Various versioning tools and synchronous editors are available for those who need additional functionality. Having a group leader who decides the scheduling, communication and conflict resolving protocols is important for successful collaboration.

  1. Collaborative writing: Tools and tips.

    Science.gov (United States)

    Eapen, Bell Raj

    2007-01-01

    Majority of technical writing is done by groups of experts and various web based applications have made this collaboration easy. Email exchange of word processor documents with tracked changes used to be the standard technique for collaborative writing. However web based tools like Google docs and Spreadsheets have made the process fast and efficient. Various versioning tools and synchronous editors are available for those who need additional functionality. Having a group leader who decides the scheduling, communication and conflict resolving protocols is important for successful collaboration.

  2. Socially extended intentions-in-action

    DEFF Research Database (Denmark)

    Blomberg, Olle

    2011-01-01

    as an unconditional constraint on the contents of intentions-in-action: one may intend to perform a basic action that belongs both to oneself and to another agent. Based on the phenomenology of tool use, I first argue that intentions-in-action of one’s basic actions may be technologically extended, meaning...... that their contents are not restricted to concern the agent’s bodily movements. In analogy with this, I then argue that the phenomenology of some skillful joint activities supports the idea that one’s basic intentions-in-action may be socially extended, in violation of the widely accepted exclusivity constraint...

  3. Development of an international schedule for the assessment and staging of care for dementia.

    Science.gov (United States)

    Semrau, Maya; Burns, Alistair; Djukic-Dejanovic, Slavica; Eraslan, Defne; Han, Changsu; Lecic-Tosevski, Dusica; Lobo, Antonio; Mihai, Adriana; Morris, Julie; Palumbo, Claudia; Robert, Philippe; Stiens, Gerthild; Stoppe, Gabriela; Volpe, Umberto; Rikkert, Marcel Olde; Sartorius, Norman

    2015-01-01

    A reliable and valid global staging scale has been lacking within dementia care. To develop an easy-to-use multi-dimensional clinical staging schedule for dementia. The schedule was developed through: i) Two series of focus groups (40 and 48 participants, respectively) in Denmark, France, Germany, Netherlands, Spain, Switzerland, and UK with a multi-disciplinary group of professionals working within dementia care, to assess the need for a dementia-staging tool and to obtain suggestions on its design and characteristics; ii) A pilot-study over three rounds to test inter-rater reliability of the newly developed schedule using written case histories, with five members of the project's steering committee and 27 of their colleagues from Netherlands, France, and Spain as participants; and iii) A field-study to test the schedule's inter-rater reliability in clinical practice in France, Germany, Netherlands, Spain, Italy, Turkey, South Korea, Romania, and Serbia, which included 209 dementia patients and 217 of their caregivers as participants. Focus group participants indicated a clear need for a culture-fair international dementia staging scale and reached consensus on face validity and content validity. Accordingly, the schedule has been composed of seven dimensions including behavioral, cognitive, physical, functional, social, and care aspects. Overall, the schedule showed adequate face validity, content validity, and inter-rater reliability; in the nine field-sites, intraclass correlation coefficients (ICCs; absolute agreement) for individual dimensions ranged between 0.38 and 1.0, with 84.4% of ICCs over 0.7. ICCs for total sum scores ranged between 0.89 and 0.99 in the nine field-sites. The IDEAL schedule looks promising as tool for the clinical and social management of people with dementia globally, though further reliability and validity testing is needed.

  4. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  5. Empirical results on scheduling and dynamic backtracking

    Science.gov (United States)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  6. Analysis of crimes committed against scheduled tribes

    Science.gov (United States)

    Khadse, Vivek P.; Akhil, P.; Anto, Christopher; Gnanasigamani, Lydia J.

    2017-11-01

    One of the curses to the society is a crime which has a deep impact on the society. Victims of crimes are the one who is impacted the most. All communities in the world are affected by crime and the criminal justice system, but largely impacted communities are the backward classes. There are many cases reported of crime committed against scheduled tribes from the year 2005 till date. This paper states the analysis of Crimes Committed against Scheduled Tribes in the year 2015 in various states and union territories in India. In this study, Multiple Linear regression techniques have been used to analyze the crimes committed against scheduled tribes’ community in India. This study compares the number of cases reported to the police station and rate of crime committed in different states in India. It also states the future prediction of the crime that would happen. It will also predict the number of cases of crime committed against the scheduled tribe that can be reported in future. The dataset which has been used in this study is taken from official Indian government repository for crimes which include different information of crimes committed against scheduled tribes in different states and union territories measured under the population census of the year 2011. This study will help different Indian states and union territory government to analyze and predict the future crimes that may occur and take appropriate measures against it before the actual crime would occur.

  7. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  8. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  9. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  10. Simulation tools

    CERN Document Server

    Jenni, F

    2006-01-01

    In the last two decades, simulation tools made a significant contribution to the great progress in development of power electronics. Time to market was shortened and development costs were reduced drastically. Falling costs, as well as improved speed and precision, opened new fields of application. Today, continuous and switched circuits can be mixed. A comfortable number of powerful simulation tools is available. The users have to choose the best suitable for their application. Here a simple rule applies: The best available simulation tool is the tool the user is already used to (provided, it can solve the task). Abilities, speed, user friendliness and other features are continuously being improved—even though they are already powerful and comfortable. This paper aims at giving the reader an insight into the simulation of power electronics. Starting with a short description of the fundamentals of a simulation tool as well as properties of tools, several tools are presented. Starting with simplified models ...

  11. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  12. Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Gano, K. A.; Lucas, J. G.; Lindsey, C. T.

    2011-06-30

    This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

  13. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  14. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline; Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project.

  15. A Gain-Scheduling PI Control Based on Neural Networks

    Directory of Open Access Journals (Sweden)

    Stefania Tronci

    2017-01-01

    Full Text Available This paper presents a gain-scheduling design technique that relies upon neural models to approximate plant behaviour. The controller design is based on generic model control (GMC formalisms and linearization of the neural model of the process. As a result, a PI controller action is obtained, where the gain depends on the state of the system and is adapted instantaneously on-line. The algorithm is tested on a nonisothermal continuous stirred tank reactor (CSTR, considering both single-input single-output (SISO and multi-input multi-output (MIMO control problems. Simulation results show that the proposed controller provides satisfactory performance during set-point changes and disturbance rejection.

  16. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  17. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  18. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  19. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  20. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    Science.gov (United States)

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  1. 76 FR 77895 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Science.gov (United States)

    2011-12-15

    ... medical use, and the degree of dependence the substance may cause, 21 U.S.C. 812. The initial schedules of... with this finding of conditions of public health and of good cause to waive the 30 day period and... of Schedule IV substances such as alprazolam can range from mild dysphoria and insomnia to a major...

  2. Integrated scheduled waste management system in Kuala Lumpur ...

    African Journals Online (AJOL)

    GREGORY

    2011-12-16

    Dec 16, 2011 ... requirements, packaging requirements, impact of scheduled wastes, recycling of scheduled wastes and recommendations. Besides ... specifically excludes municipal solid waste and municipal sewage. Scheduled wastes are ... scheduled waste generated in Kuala Lumpur (KL) and service provided for ...

  3. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    This paper proposes a topology-based hierarchical scheduling scheme using Deficit Round Robin (DRR). The main idea of the topology-based hierarchical scheduling is to map the topology of the connected network into the logical structure of the scheduler, and combine several token schedulers accord...... of malicious traffic. This is significant for IPTV services in Carrier Ethernet networks....

  4. A Priority-Based Budget Scheduler with Conservative Dataflow Model

    NARCIS (Netherlands)

    Steine, Marcel; Bekooij, Marco Jan Gerrit; Wiggers, M.H.

    2009-01-01

    Currently, the guaranteed throughput of a stream processing application, mapped on a multi-processor system, can be computed with a conservative dataflow model, if only time division multiplex (TDM) schedulers are applied. A TDM scheduler is a budget scheduler. Budget schedulers can be characterized

  5. Proposed algorithm to improve job shop production scheduling using ant colony optimization method

    Science.gov (United States)

    Pakpahan, Eka KA; Kristina, Sonna; Setiawan, Ari

    2017-12-01

    This paper deals with the determination of job shop production schedule on an automatic environment. On this particular environment, machines and material handling system are integrated and controlled by a computer center where schedule were created and then used to dictate the movement of parts and the operations at each machine. This setting is usually designed to have an unmanned production process for a specified interval time. We consider here parts with various operations requirement. Each operation requires specific cutting tools. These parts are to be scheduled on machines each having identical capability, meaning that each machine is equipped with a similar set of cutting tools therefore is capable of processing any operation. The availability of a particular machine to process a particular operation is determined by the remaining life time of its cutting tools. We proposed an algorithm based on the ant colony optimization method and embedded them on matlab software to generate production schedule which minimize the total processing time of the parts (makespan). We test the algorithm on data provided by real industry and the process shows a very short computation time. This contributes a lot to the flexibility and timelines targeted on an automatic environment.

  6. A Case Study of Line-of-Balance based Schedule Planning and Control System

    OpenAIRE

    Seppänen, Olli; Aalto, Erno

    2005-01-01

    Line-of-Balance is a graphical technique which can be used to plan and manage work flow. It is suit-able for construction projects because of their large degree of repetition. Despite its strengths Line-of-Balance has not gained widespread use in construction industry internationally. However, it has been used as the principal scheduling tool in Finland since 1980s. As a result of two decades of research and use in industry, a comprehensive schedule planning and control system has been develo...

  7. Energy-Aware Synthesis of Fault-Tolerant Schedules for Real-Time Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    This paper presents a design optimisation tool for distributed embedded real-time systems that 1) decides mapping, fault-tolerance policy and generates a fault-tolerant schedule, 2) is targeted for hard real-time, 3) has hard reliability goal, 4) generates static schedule for processes and messages......, 5) provides fault-tolerance for k transient/soft faults, 6) optimises for minimal energy consumption, while considering impact of lowering voltages on the probability of faults, 7) uses constraint logic programming (CLP) based implementation....

  8. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    -Wolfe decomposition is presented. The pricing problem is the linear multicommodity flow problem defined on a time-space network. Branching strategies are presented for the branchand-price algorithm and three heuristics and an exact solution method are implemented for finding a feasible start solution. Finally......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  9. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  10. A scheduling algorithm based on Clara clustering

    Science.gov (United States)

    Kuang, Ling; Zhang, Lichen

    2017-08-01

    Task scheduling is a key issue in cloud computing. A new algorithm for queuing task scheduling based on Clara clustering and SJF cloud computing is proposed to introduce the Clara clustering for the shortcomings of SJF algorithm load imbalance. The Clara clustering method prepares the task clustering based on the task execution time and the waiting time of the task, and then divides the task into three groups according to the reference point obtained by the clustering. Based on the number of tasks per group in the proportion of the total number of tasks assigned to the implementation of the quota. Each queue team will perform task scheduling based on these quotas and SJF. The simulation results show that the algorithm has good load balancing and system performance.

  11. Effects of 4X4 Block Scheduling

    Directory of Open Access Journals (Sweden)

    R. Brian Cobb

    1999-02-01

    Full Text Available The effects of a 4 X 4 block scheduling program in a middle school on a variety of student measures were investigated. These measures included standardized achievement tests in mathematics, reading, and writing, cumulative and semester grades in middle school and high school, attendance rates, and enrollment rates in advanced high school courses (in mathematics only. The block scheduling program had been in effect for four years allowing analyses of current middle and high school students who had experienced a minimum of one and one-half years of block scheduling while in middle school. The primary research design was a post-test only, matched pairs design. Students were matched on school characteristics, gender, ethnicity, grade level, and 5th grade standardized reading scores. Results were relatively consistent with the extant literature and generally positive.

  12. MDTM: Optimizing Data Transfer using Multicore-Aware I/O Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Liang [Fermilab; Demar, Phil [Fermilab; Wu, Wenji [Fermilab; Kim, Bockjoo [Florida U.

    2017-05-09

    Bulk data transfer is facing significant challenges in the coming era of big data. There are multiple performance bottlenecks along the end-to-end path from the source to destination storage system. The limitations of current generation data transfer tools themselves can have a significant impact on end-to-end data transfer rates. In this paper, we identify the issues that lead to underperformance of these tools, and present a new data transfer tool with an innovative I/O scheduler called MDTM. The MDTM scheduler exploits underlying multicore layouts to optimize throughput by reducing delay and contention for I/O reading and writing operations. With our evaluations, we show how MDTM successfully avoids NUMA-based congestion and significantly improves end-to-end data transfer rates across high-speed wide area networks.

  13. MDTM: Optimizing Data Transfer using Multicore-Aware I/O Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Liang [Fermilab; Demar, Phil [Fermilab; Wu, Wenji [Fermilab; Kim, Bockjoo [Florida U.

    2017-01-01

    Bulk data transfer is facing significant challenges in the coming era of big data. There are multiple performance bottlenecks along the end-to-end path from the source to destination storage system. The limitations of current generation data transfer tools themselves can have a significant impact on end-to-end data transfer rates. In this paper, we identify the issues that lead to underperformance of these tools, and present a new data transfer tool with an innovative I/O scheduler called MDTM. The MDTM scheduler exploits underlying multicore layouts to optimize throughput by reducing delay and contention for I/O reading and writing operations. With our evaluations, we show how MDTM successfully avoids NUMA-based congestion and significantly improves end-to-end data transfer rates across high-speed wide area networks.

  14. Scheduling of inspectors for ticket spot checking in urban rail transportation

    DEFF Research Database (Denmark)

    Thorlacius, Per; Clausen, Jens

    2010-01-01

    A central issue for operators of passenger transportation in urban rail is balancing the income from tickets against the cost of the operation. The main part of the income except for governmental subsides comes from sales of tickets. There are various ways to ensure that all passengers carry valid...... of the inspectors, this tool enables the construction of new schedules for ticket inspectors, such that the income from penalty fares claimed from passengers without a valid ticket is maximised. Other tools to increase income from ticket sales and penalty fares are also discussed....... tickets, i.e. to avoid so called fare evasion. Many European companies use spot checking of passengers and among these is DSB S-tog. The current paper describes a decision support tool developed at DSB S-tog. Based on historical data regarding when penalty fares are claimed and based on the schedules...

  15. NutriLive: An Integrated Nutritional Approach as a Sustainable Tool to Prevent Malnutrition in Older People and Promote Active and Healthy Ageing—The EIP-AHA Nutrition Action Group

    OpenAIRE

    Maddalena Illario; Angela Serena Maione; Maria Rosaria Rusciano; Edwig Goossens; Amelia Rauter; Nidia Braz; Harriet Jager-Wittenaar; Carolina Di Somma; Catherine Crola; Maria Soprano; Laura Vuolo; Pietro Campiglia; Guido Iaccarino; Helen Griffiths; Tobias Hartman

    2016-01-01

    The present document describes a nutritional approach that is nested in the European Innovation Partnership for Active and Healthy Aging (EIP-AHA) and aims to provide the first common European program translating an integrated approach to nutritional frailty in terms of a multidimensional and transnational methodology. The document has been developed by the A3 Nutrition Action Area of the EIP-AHA and aims at providing a stepwise approach to malnutrition in older citizens, identifying adequate...

  16. S-CHART - SCHEDULING CHART PROGRAM

    Science.gov (United States)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  17. A heuristic approach to incremental and reactive scheduling

    Science.gov (United States)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  18. Providing frequency regulation reserve services using demand response scheduling

    International Nuclear Information System (INIS)

    Motalleb, Mahdi; Thornton, Matsu; Reihani, Ehsan; Ghorbani, Reza

    2016-01-01

    Highlights: • Proposing a market model for contingency reserve services using demand response. • Considering transient limitations of grid frequency for inverter-based generations. • Price-sensitive scheduling of residential batteries and water heaters using dynamic programming. • Calculating the profits of both generation companies and demand response aggregators. - Abstract: During power grid contingencies, frequency regulation is a primary concern. Historically, frequency regulation during contingency events has been the sole responsibility of the power utility. We present a practical method of using distributed demand response scheduling to provide frequency regulation during contingency events. This paper discusses the implementation of a control system model for the use of distributed energy storage systems such as battery banks and electric water heaters as a source of ancillary services. We present an algorithm which handles the optimization of demand response scheduling for normal operation and during contingency events. We use dynamic programming as an optimization tool. A price signal is developed using optimal power flow calculations to determine the locational marginal price of electricity, while sensor data for water usage is also collected. Using these inputs to dynamic programming, the optimal control signals are given as output. We assume a market model in which distributed demand response resources are sold as a commodity on the open market and profits from demand response aggregators as brokers of distributed demand response resources can be calculated. In considering control decisions for regulation of transient changes in frequency, we focus on IEEE standard 1547 in order to prevent the safety shut-off of inverter-based generation and further exacerbation of frequency droop. This method is applied to IEEE case 118 as a demonstration of the method in practice.

  19. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  20. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...