WorldWideScience

Sample records for action project wssrap

  1. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  2. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  3. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  4. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  5. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  6. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included

  7. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  8. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  9. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status to date January 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments

  10. Involving technical professionals in community relations

    International Nuclear Information System (INIS)

    Meyer, K.A.; Meyer, L.

    1994-01-01

    The Weldon Spring site Remedial Action Project (WSSRAP), a U.S. Department of Energy (DOE) environmental restoration project, has developed a successful community relations program that differs from the traditional approach and has built a general consensus about the DOE's work at the Weldon Spring site. The WSSRAP has a small, dedicated Community Relations Department that is heavily supported by technical professionals who receive intensive training in preparatory and presentation skills, role-playing, and critiquing of performances. This training allows the public to speak directly with the individuals responsible for remediation activities. The media, in turn, has access to technical individuals with good presentation skills, and WSSRAP managers can be confident that interactions are handled professionally. This approach results in a satisfied client. The WSSRAP's community relations program is a high-quality, cost-effective program that could be easily implemented by other facilities

  11. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  12. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  13. WSSRAP [Weldon Spring Site Remedial Action Project] quarry preliminary engineering report

    International Nuclear Information System (INIS)

    1990-01-01

    The removal, transport, and temporary storage of radiologically and chemically contaminated bulk waste from the Weldon Spring Quarry will be accomplished by dividing the work into three subcontract packages. The major portion of the work will come under the bulk waste excavation package; construction of a temporary storage area (TSA) at the Weldon Spring Chemical Plant and of a haul road between the quarry and the TSA comprise the other two packages. Cost estimates to complete the removal range from $5 million to $9.4 million due to a high degree of uncertainty regarding both the productivity of the excavating equipment and the effectiveness of planned dewatering efforts. Quarry wastes will be substantially dewatered and the water treated before discharge. Waste will be excavated in three phases, using conventional construction equipment, with preliminary sorting of waste at the quarry before transport to the TSA. Special attention will be given to controlling the spread of contamination by careful monitoring and control of surface and groundwater drainage and of particulate and radiological contamination of the air. 6 refs., 21 figs., 8 tabs

  14. Proceedings of the geosciences workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-01-01

    The manuscripts in these proceedings represent current understanding of geologic issues associated with the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is in St. Charles County, Missouri. The proceedings are the record of the information presented during the WSSRAP Geosciences Workshop conducted on February 21, 1991. The objective of the workshop and proceedings is to provide the public and scientific community with technical information that will facilitate a common understanding of the geology of the Weldon Spring site, of the studies that have been and will be conducted, and of the issues associated with current and planned activities at the site. This coverage of geologic topics is part of the US Department of Energy overall program to keep the public fully informed of the status of the project and to address public concerns as we clean up the site and work toward the eventual release of the property for use by this and future generations. Papers in these proceedings detail the geology and hydrology of the site. The mission of the WSSRAP derives from the US Department of Energy's Surplus Facilities Management Program. The WSSRAP will eliminate potential hazards to the public and the environment and make surplus real property available for other uses to the extent possible. This will be accomplished by conducting remedial actions which will place the quarry, the raffinate pits, the chemical plant, and the vicinity properties in a radiologically and chemically safe condition. The individual papers have been catalogued separately.

  15. Modified TCLP test for evaluating the leachability of site-specific wastes

    International Nuclear Information System (INIS)

    Pier, J.

    1996-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) has developed a site-specific test to assess the leachability of wastes that will be placed in its on-site disposal cell. This test is modelled after the TCLP, but examines an expanded list of parameters and uses an extraction solution that is representative of conditions that are expected to exist in the disposal facility. Following the same logic that guided development of TCLP protocols, the WSSRAP developed concentration guidelines for non-TCLP parameters that were contaminants of concern in its wastes. Response actions, specific to the WSSRAP cell and wastes, were also developed to address constituents that failed to meet these guides. From 1955 to 1966, the US Atomic Energy Commission operated a uranium feed materials plant on this site. Nitroaromatic, and later, radiological wastes were disposed of in the quarry from 1945 until 1970. This paper describes testing to determine whether contaminant concentrations in leachates derived from the major waste-types that will be placed in its on-site disposal cell conform with the Department of Energy's (DOE) as low as reasonably achievable (ALARA) policy. Although the WSSRAP will continue to use the TCLP test to determine if any waste is classified RCRA-hazardous, the site-specific test described in this paper will be used to further assess whether leachate from any waste-type has the potential to adversely impact groundwater

  16. Development of the chemical stabilization and solidification process for the treatment of radioactive raffinate sludges at the DOE Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Cole, P.M.; Kakaria, V.; Enger, J.

    1996-01-01

    Chemical Solidification and Stabilization (CSS) is the mixing of chemical reagents with waste to solidify and chemically stabilize the contaminated material. The resulting product is resistant to leaching of certain contaminants. CSS treatment using Class C fly ash and Portland cement was chosen as the most feasible method for treatment of the chemically and radioactively contaminated sludge (raffinate) contained in raffinate pits on the Weldon Spring Site Remedial Action Project (WSSRAP) located outside of St. Louis, Missouri. Due to the uniqueness of the material, substantial bench-scale testing was performed on the raffinate to better understand its properties. Similarly, due to mixed results in the application of CSS treatment to radioactive materials, a pilot-scale testing facility was built to verify bench testing results and to establish and quantify design parameters for the full-scale CSS production facility. This paper discusses the development of the pilot-scale testing facility, the testing plan, and the results of the testing activities. Particular attention has been given to the applicability of the CSS treatment method and to the value of pilot-scale testing

  17. Weldon spring site environmental report for calendar year 1996. Revision 0

    International Nuclear Information System (INIS)

    1997-01-01

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring

  18. Weldon spring site environmental report for calendar year 1996. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-23

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  19. Executive summary for the Weldon Spring Site Environmental Report for calendar year 1991

    International Nuclear Information System (INIS)

    1992-07-01

    This report is the sixth in a series of annual reports produced by the Weldon Spring Site Remedial Action Project (WSSRAP) since 1986. It reports the results of a comprehensive, year-round program to monitor the impact of the Weldon Spring site (WSS) on the surrounding region's groundwater and surface waters; air quality; vegetation and wildlife; and, through these multiple pathways, the potential for exposure to receptor human populations. Information is also presented on the environmental monitoring quality assurance program, waste management activities, audits and reviews, and special environmental studies. Data are included for both the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. Based on the consistent exercise of quality assurance in both standard operating procedures and quality control sample collection, the WSSRAP asserts that the data presented in the WSS Environmental Report for Calendar Year 1991 accurately reflect the environmental conditions monitored at the WSS. This report presents narratives, summaries, and conclusions on environmental monitoring at the WSS and surrounding vicinity properties for the entire 1991 monitoring year. During 1991 the WSSRAP also published quarterly data reports, wherein all routine monitoring data were tabulated and presented quarterly to allow the public to review the data in a timely fashion prior to issuance of the annual report

  20. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  1. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  2. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  3. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  4. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  5. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  6. Community Action Projects: Applying Biotechnology in the Real World

    Science.gov (United States)

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  7. Water treatment technologies for a mixed waste remedial action

    International Nuclear Information System (INIS)

    Reith, C.; Freeman, G.; Ballew, B.

    1992-01-01

    Water treatment is an important element of the Weldon Spring Site Remedial Action Project (WSSRAP), which is cleaning up a former uranium processing plant near St. Louis, Missouri. This project, under the management of the U.S. Department of Energy (DOE), includes treatment and release of contaminated surface water and possibly groundwater at the plant site and a nearby quarry, which was once used for waste disposal. The contaminants include uranium, thorium, radium, nitroaromatics, nitrates, and metals. Three water treatment plants will be used to treat contaminated water prior to its release to the Missouri River. The first, construction of which is nearly complete, will treat contaminated surface water and interstitial water in and around the quarry. A stepwise process of sedimentation, clarification, filtration, adsorption, and ion exchange will be used to remove the contaminants. A similar sequence will be used for the first train of the water treatment plant at the plant site, although process details have been adjusted to address the different contaminant concentrations. The site water treatment plant will also have a second train consisting of a vapor compression/ distillation (VCD) system. Train 2 is necessary to treat waters primarily from four raffinate pits containing high concentrations of inorganics (e.g., nitrates, sulfates, and chlorides) in addition to radionuclides, nitroaromatics, and metals contamination that are common in most of the waters at the site. Construction is under way on the First train of this facility. After it is treated, all water will be impounded and batch tested for compliance with the project's National Pollution Discharge Elimination System (NPDES) permits prior to release to the Missouri River. The third water treatment plant is a mobile system that will be used to treat waters in some of the building sumps. (author)

  8. Water treatment technologies for a mixed waste remedial action

    Energy Technology Data Exchange (ETDEWEB)

    Reith, C; Freeman, G [Weldon Spring Site Remedial Action Project, Jacobs Engineering Group, Inc., St. Charles, MO (United States); Ballew, B [Weldon Spring Site Remedial Action Project, Dames and Moore, St. Charles, MO (United States)

    1992-07-01

    Water treatment is an important element of the Weldon Spring Site Remedial Action Project (WSSRAP), which is cleaning up a former uranium processing plant near St. Louis, Missouri. This project, under the management of the U.S. Department of Energy (DOE), includes treatment and release of contaminated surface water and possibly groundwater at the plant site and a nearby quarry, which was once used for waste disposal. The contaminants include uranium, thorium, radium, nitroaromatics, nitrates, and metals. Three water treatment plants will be used to treat contaminated water prior to its release to the Missouri River. The first, construction of which is nearly complete, will treat contaminated surface water and interstitial water in and around the quarry. A stepwise process of sedimentation, clarification, filtration, adsorption, and ion exchange will be used to remove the contaminants. A similar sequence will be used for the first train of the water treatment plant at the plant site, although process details have been adjusted to address the different contaminant concentrations. The site water treatment plant will also have a second train consisting of a vapor compression/ distillation (VCD) system. Train 2 is necessary to treat waters primarily from four raffinate pits containing high concentrations of inorganics (e.g., nitrates, sulfates, and chlorides) in addition to radionuclides, nitroaromatics, and metals contamination that are common in most of the waters at the site. Construction is under way on the First train of this facility. After it is treated, all water will be impounded and batch tested for compliance with the project's National Pollution Discharge Elimination System (NPDES) permits prior to release to the Missouri River. The third water treatment plant is a mobile system that will be used to treat waters in some of the building sumps. (author)

  9. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  10. Risk Management Affecting IS/IT Project Success Through Communicative Action

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    Project risk management is defined in the literature as being instrumental action based on rational problem solving. Research indicates limited positive effects of an exclusive focus of instrumental action on project success. This article proposes to extend this instrumental view through

  11. Development of a model for geomorphological assessment at U.S. DOE chemical/radioactive waste disposal facilities in the central and eastern United States; Weldon spring site remedial action project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    Rockaway, J.D.; Smith, R.J.

    1994-01-01

    Landform development and long-term geomorphic stability is the result of a complex interaction of a number of geomorphic processes. These processes may be highly variable in intensity and duration under different physiographic settings. This limitation has influenced the applicability of previous geomorphological stability assessments conducted in the arid or semi-arid western United States to site evaluations in more temperate and humid climates. The purpose of this study was to develop a model suitable for evaluating both long-term and short-term geomorphic processes which may impact landform stability and hence the stability of disposal facilities located in the central and eastern United States. The model developed for the geomorphological stability assessment at the Weldon Spring Site Remedial Action Project (WSSRAP) near St. Louis, Missouri, included an evaluation of existing landforms and consideration of the impact of both long-term and short-term geomorphic processes. These parameters were evaluated with respect to their impact and contribution to three assessment criteria considered most important with respect to the stability analysis; evaluation of landform age, evaluation of present geomorphic process activity and; determination of the impact of the completed facility on existing geomorphic processes. The geomorphological assessment at the Weldon Spring site indicated that the facility is located in an area of excellent geomorphic stability. The only geomorphic process determined to have a potential detrimental effect on long-term facility performance is an extension of the drainage network. A program of mitigating measures has been proposed to minimize the impact that future gully extension could have on the integrity of the facility

  12. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    Science.gov (United States)

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  13. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  14. The Biodiversity Community Action Project: An STS Investigation

    Science.gov (United States)

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  15. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    Science.gov (United States)

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects.

  16. UMTRA Surface Project management action process document: Final. Revision 2

    International Nuclear Information System (INIS)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites

  17. UMTRA Surface Project management action process document: Final. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  18. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    Science.gov (United States)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  19. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  20. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  1. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  2. UMTRA -- The US Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Lightner, R.; Cormier, C.; Bierley, D.

    1995-01-01

    In the late 1970s, the United States (US) established the first comprehensive regulatory structure for the management, disposal, and long-term care of wastes produced from its domestic uranium processing industry. This regulatory framework was established through the passage of the Uranium Mill Tailings Radiation Control Act of 1978, often referred to as UMTRCA. This legislation created the Uranium Mill Tailings Remedial Action (UMTRA) Project and assigned the US Department of Energy (DOE) the lead in conducting the required remedial action at 24 designated inactive uranium ore processing sites. With the majority of these 22 sites complete, the DOE's UMTRA Project has established a distinguished reputation for safely and effectively remediating these low-level waste sites in a complex regulatory and socioeconomic environment. This paper describes the past accomplishments and current status of the UMTRA Project and discusses the DOE's plans for addressing ground water contamination associated with these sites and its commitment to continuing the long-term care and management of these disposal cells

  3. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  4. Engineering design and test plan for demonstrating DETOX treatment of mixed wastes

    International Nuclear Information System (INIS)

    Goldblatt, S.; Dhooge, P.

    1995-01-01

    DETOX is a cocatalyzed wet oxidation process in which the catalysts are a relatively great concentration of iron ions (typically as iron(III) chloride) in the presence of small amounts of platinum and ruthenium ions. Organic compounds are oxidized completely to carbon dioxide, water, and (if chlorinated) hydrogen chloride. The process has shown promise as a non-thermal alternative to incineration for treatment and/or volume reduction of hazardous, radioactive, and mixed wastes. Design and fabrication of a demonstration unit capable of destroying 25. Kg/hr of organic material is now in progress. This paper describes the Title 2 design of the demonstration unit, and the planned demonstration effort at Savannah River Site (SRS) and Weldon Spring Site Remedial Action Project (WSSRAP)

  5. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  6. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA

  7. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  8. UMTRA Surface Project management action process document. Final report: Revision 1

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project

  9. Alcan Kitimat smelter modernization project remedial action scheme functional requirements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-09-09

    This paper identified remedial actions for reducing islanding and voltage collapse at the Alcan Kitimat smelter modernization project. The study was conducted after an earlier study indicated that the proposed project significantly increased electricity loads and stresses on Alcan's power system. Remedial actions included shedding the appropriate number of Kemano (KMO) generators; reducing Kitimat potline loads by de-saturating saturable reactors and lowering tap changers; and shedding potlines to preserve the Kitimat auxiliary load and facilitate power restoration. Power flow and transient stability studies were conducted to evaluate the impact of the remedial actions on the KMO generators and the transmission system. Results showed that fast load reduction improved power system response. Load reduction by changing the converter transformer tap reduced significant amounts of loads, but was too slow to be effective during fast voltage collapse. The study showed that although the remedial action scheme (RAS) reduced the impact of various contingencies on the Alcan system, performance was degraded due to the significant load increase. Fast load shedding capability was also reduced. It was concluded that further research is needed to develop and implement the RAS. 3 tabs., 7 figs.

  10. Uranium mill tailings remedial action project real estate management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence

  11. Uranium mill tailings remedial action project real estate management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  13. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    Science.gov (United States)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  14. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  15. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  16. Project InterActions: A Multigenerational Robotic Learning Environment

    Science.gov (United States)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  17. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  18. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  19. Public information experience in the uranium mill tailings remedial action (UMTRA) project

    International Nuclear Information System (INIS)

    Meyer, H.R.; Skinner, D.J.

    1986-01-01

    To enhance public perception of the UMTRA Project remedial actions at some 23 sites in the US, an information program has been designed to demonstrate the small risk associated with the work in each community. An unusual aspect of this information program has involved a specific effort to educate listeners concerning the Health Physics terminology being used. The information program has been successful in reducing the level of public anxiety associated with UMTRA remedial action at the first Project site, and is currently being applied at several new sites

  20. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  1. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  2. Hydrogeologic investigations sampling plan: Revision 0

    International Nuclear Information System (INIS)

    1988-11-01

    The goal of this sampling plan is to identify and develop specific plans for those investigative actions necessary to: (1) characterize the hydrologic regime; (2) define the extent and impact of contamination; and (3) predict future contaminant migration for the Weldon Spring Site (WSS) and vicinity. The plan is part of the Weldon Spring Site Remedial Action Project (WSSRAP) sponsored by the US Department of Energy (DOE) and has been developed in accordance with US EPA Remedial Investigation (RI) and Data Quality Objective (DQO) guidelines. The plan consists of a sequence of activities including the evaluation of data, development of a conceptual model, identification of data uses and needs, and the design and implementation of a data collection program. Data will be obtained to: (1) confirm the presence or absence of contaminants; (2) define contaminant sources and modes of transport; (3) delineate extent of contaminant migration and predict future migration; and (4) provide information to support the evaluation and selection of remedial actions. 81 refs., 62 figs., 26 tabs

  3. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  4. Survey to promote an action implemented jointly project; Kyodo jisshi katsudo project suishin chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the 1st (1995) conference of the nations which concluded the Framework Convention on Climate Change, decided on was a trial implementation of an action implemented jointly (AIJ) project with developing countries on the voluntary basis. In the Asia region, emission of greenhouse effect gas is remarkably increasing in accordance with rapid development of economy, and it is important to appropriately support through this project both economic development and energy demand in Asia. Taking the circumstance into consideration, the survey was conducted to contribute to activating the AIJ Japan Program. As the AIJ of leading developed countries, recognized were 25 (U.S.), 6 (Holland), 8 (Germany), 2 (Norway) projects. As to the AIJ in Southeast Asia, China and India, Indonesia is actively participating in the project, but others less actively. Concerning the project needs in every country, heightening of power plant efficiency, enhancement of efficiency in the transportation sector, new energy utilization, recovery of methane gas, etc. acquire a priority. 21 figs., 31 tabs.

  5. An Action Learning Project on Diversity: Pitfalls and Possibilities.

    Science.gov (United States)

    Hite, Linda M.

    1997-01-01

    In a college course on diversity in the workplace, students' experiences with conducting a cultural audit of the university as a workplace illustrate the dilemmas that can arise when students conduct action research in a real client system. Despite the inherent problems, the project resulted in significant student learning about the subject and…

  6. Health Activities Project (HAP): Heart Fitness and Action Module.

    Science.gov (United States)

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within the Heart Fitness and Action Module are teacher and student folios describing five activities which involve students in…

  7. Transgressive Practices in Participatory Action Research within the Context of Projects as a System of Governance

    DEFF Research Database (Denmark)

    Juhlin, Sharmila Maria Holmstrøm; Thingstrup, Signe Hvid

    2012-01-01

    institutional and discursive presence of projects in people’s everyday lives affects the possibilities of action research to engage in meaningful democratic and transgressive practises with its participants. When does participatory action research become yet another social technique and when does it have...... the potential to challenge dominating social hierarchies and contribute to social change? We will discuss these questions based on findings from two empirical action research projects from our own work in the multicultural field. In one project, teachers and researcher engage in the development of multicultural...

  8. Weldon Spring Site environmental report for calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    This report describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring. Comprehensive monitoring indicated that emissions of radiological compounds in airborne and surface water discharges from the Weldon Spring site consisted primarily of Rn-220 gas, isotopes of thorium and radium, and natural uranium. Airborne Rn-220 emissions were estimated to be 42 Ci (1.6E12 Bq), while emissions from a combination of thorium, radium, and natural uranium isotopes to air and surface water were estimated to be 0.018 Ci (6.7E8 Bq), for a total of 25,000 g (25 kg). There was no measurable impact to any drinking water source.

  9. Weldon Spring Site environmental report for calendar year 1997

    International Nuclear Information System (INIS)

    1998-08-01

    This report describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring. Comprehensive monitoring indicated that emissions of radiological compounds in airborne and surface water discharges from the Weldon Spring site consisted primarily of Rn-220 gas, isotopes of thorium and radium, and natural uranium. Airborne Rn-220 emissions were estimated to be 42 Ci (1.6E12 Bq), while emissions from a combination of thorium, radium, and natural uranium isotopes to air and surface water were estimated to be 0.018 Ci (6.7E8 Bq), for a total of 25,000 g (25 kg). There was no measurable impact to any drinking water source

  10. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    Rick Findlay

    2006-01-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  11. Appreciation of a Child’s Journey: Implementation of a Cardiac Action Research Project

    Directory of Open Access Journals (Sweden)

    Kate Alexa Dengler

    2012-01-01

    Full Text Available The aim of this paper is to provide an overview of the phases of the action research process involved in developing, implementing, and evaluating the Heart Beads program. The aim of the project is to enrich the hospital experience of children with cardiac conditions. Heart Beads involves children receiving unique beads specific to each cardiac treatment, procedure or event in recognition of their experiences, and endurance. An action research approach, involving a partnership between clinicians and researchers and emphasising the involvement of patients and their families, was used to guide the Heart Beads program. The project followed the five phases of action research: identification, investigation, program development, implementation, and evaluation. Heart Beads began as a small project which continues to grow in popularity and significance with children at a tertiary paediatric hospital in Sydney, Australia. The program is now being implemented nationwide with the vision that all Australian children hospitalised with cardiac conditions can benefit from Heart Beads.

  12. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    Carson, J.W.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Remsen, W.E.; Tuttle, B.G.; Wilson, R.C.

    1997-09-01

    This report documents the readiness assessment for initial startup of the 300-FF-1 Remedial Action Task. A readiness assessment verifies and documents that field activities are ready to start (or restart) safely. The 300-FF-1 assessment was initiated in April 1997. Readiness assessment activities included confirming the completion of project-specific procedures and permits, training staff, obtaining support equipment, receipt and approval of subcontractor submittals, and mobilization and construction of site support systems. The scope of the 300-FF-1 Remedial Action Task includes excavation and disposal of contaminated soils at liquid waste disposal facilities and of waste in the 618-4 Burial Ground and the 300-FF-1 landfills. The scope also includes excavation of test pits and test trenches

  13. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  14. An integrated ball projection technology for the study of dynamic interceptive actions.

    Science.gov (United States)

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  15. Public opinion and communicative action around renewable energy projects

    Science.gov (United States)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  16. The action of the project coordinator with respect to reactor safety

    International Nuclear Information System (INIS)

    Leclercq, Jacques

    1981-01-01

    Before describing the various actions of the project coordinator (EDF) entrusted with the building of nuclear power stations, with respect to reactor safety in France, the definition of reactor safety and the various participants are mentioned first. These participants are: the Government Departments and the Experts involved (the Department of Nuclear Safety of the 'Institut de Protection et de Surete Nucleaire' forming the first technical support) and the applicant, namely the EDF. The reactor safety actions of the project coordinator are defined as from the following components: 1 - The targets laid down with respect to safety, the final objective being the protection of workers and the public against the potential dangers of the installations, principally against radiation. 2 - The safety methodology at the design stage of the power station: 'barrier' method, defence method in depth at three levels, lines of assurance method, and probabilistic method. 3 - Safety actions at the construction stage within the context of an assurance of quality programe. 4 - Safety at the trials, commissioning and operating stage, with the backing of the 'Groupe Operationnel de Demarrage (G.O.D.)' and the 'Commission d'Essais sur Site (C.E.S.)'. An initial balance sheet of the reactor safety actions for the PWR units built by the EDF is presented [fr

  17. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    Science.gov (United States)

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  18. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  19. A Collaborative Action Research Project towards Embedding ESD within the Higher Education Curriculum

    Science.gov (United States)

    Cebrián, Gisela

    2017-01-01

    Purpose: This paper aims to present a collaborative action research project conducted at the University of Southampton with the aim to promote curriculum and professional development in education for sustainable development (ESD) and learn from everyday practices of academics. Design/methodology/approach: An action research approach guided by…

  20. A simplified approach to the PROMETHEE method for priority setting in management of mine action projects

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2016-12-01

    Full Text Available In the last 20 years, priority setting in mine actions, i.e. in humanitarian demining, has become an increasingly important topic. Given that mine action projects require management and decision-making based on a multi -criteria approach, multi-criteria decision-making methods like PROMETHEE and AHP have been used worldwide for priority setting. However, from the aspect of mine action, where stakeholders in the decision-making process for priority setting are project managers, local politicians, leaders of different humanitarian organizations, or similar, applying these methods can be difficult. Therefore, a specialized web-based decision support system (Web DSS for priority setting, developed as part of the FP7 project TIRAMISU, has been extended using a module for developing custom priority setting scenarios in line with an exceptionally easy, user-friendly approach. The idea behind this research is to simplify the multi-criteria analysis based on the PROMETHEE method. Therefore, a simplified PROMETHEE method based on statistical analysis for automated suggestions of parameters such as preference function thresholds, interactive selection of criteria weights, and easy input of criteria evaluations is presented in this paper. The result is web-based DSS that can be applied worldwide for priority setting in mine action. Additionally, the management of mine action projects is supported using modules for providing spatial data based on the geographic information system (GIS. In this paper, the benefits and limitations of a simplified PROMETHEE method are presented using a case study involving mine action projects, and subsequently, certain proposals are given for the further research.

  1. Generalized Born-Infeld actions and projective cubic curves

    Energy Technology Data Exchange (ETDEWEB)

    Ferrara, S. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); INFN - Laboratori Nazionali di Frascati, Via Enrico Fermi 40, I-00044, Frascati (Italy); Porrati, M. [CCPP, Department of Physics, NYU, 4 Washington Pl., New York, NY, 10003 (United States); Sagnotti, A. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); Stora, R. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); Laboratoire d' Annecy-le-Vieux de Physique Theorique (LAPTH), F-74941, Annecy-le-Vieux, Cedex (France); Yeranyan, A. [INFN - Laboratori Nazionali di Frascati, Via Enrico Fermi 40, I-00044, Frascati (Italy); Centro Studi e Ricerche Enrico Fermi, Via Panisperna 89A, 00184, Roma (Italy)

    2015-04-01

    We investigate U(1){sup n} supersymmetric Born-Infeld Lagrangians with a second non-linearly realized supersymmetry. The resulting non-linear structure is more complex than the square root present in the standard Born-Infeld action, and nonetheless the quadratic constraints determining these models can be solved exactly in all cases containing three vector multiplets. The corresponding models are classified by cubic holomorphic prepotentials. Their symmetry structures are associated to projective cubic varieties. (copyright 2015 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  2. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  3. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  4. Leadership for ethical policy and practice (LEPP): participatory action project.

    Science.gov (United States)

    Storch, Janet; Rodney, Patricia; Varcoe, Colleen; Pauly, Bernadette; Starzomski, Rosalie; Stevenson, Lynne; Best, Lynette; Mass, Heather; Fulton, Thomas Reilly; Mildon, Barbara; Bees, Fiona; Chisholm, Anne; MacDonald-Rencz, Sandra; McCutcheon, Amy Sanchez; Shamian, Judith; Thompson, Charlotte; Makaroff, Kara Schick; Newton, Lorelei

    2009-01-01

    Within Canada's fast-paced, ever-changing healthcare environment, providers are experiencing difficulty practising according to their professional ethical standards, leading many to experience moral or ethical distress. Limited attention has been paid to improvements in the ethical climate in healthcare settings in research focusing on nurses' workplaces. In this three-year study, we focused on how the ethical climate in healthcare delivery can be improved and how the use of participatory action research methods can lead to continued enhancements and lasting changes in services delivery. Together, we developed strategies for taking action, aimed at improving the quality of the work environment. This action involved both nurses in direct care and those in key leadership positions (CNOs or their equivalents). Through the active participation of those for whom the research-based change was intended, these strategies were tested in various sites across British Columbia and can be used as templates or designs for use in other settings. A key component of the success of the projects and action plans that were created was the integral involvement of nurse leaders through all phases.

  5. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  6. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  7. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  8. Improving student midwives’ practice learning in Uganda through action research: the MOMENTUM project

    Directory of Open Access Journals (Sweden)

    Joy Kemp

    2018-05-01

    Full Text Available Background and context: The Royal College of Midwives is engaged in a long-term twinning partnership with the Uganda Private Midwives Association. Uganda is one of the poorest countries in the world and only 27% of women and newborns have their needs met (UNFPA, 2014. A well-skilled, competent midwifery workforce is required to meet these needs yet Ugandan student midwives often receive poor-quality clinical education. The Ugandan Nurses and Midwives Council approached the Royal College of Midwives for assistance in designing a system of mentorship for Ugandan midwifery to address this gap. The project was funded by UK-Aid through the Tropical Health and Education Trust. Aims of the project: MOMENTUM was a 20-month action research project that aimed to develop and pilot a model of mentorship for student midwives in Uganda. This article focuses on one workstream relating to practice development, a twinning project that used workbased learning and appreciative inquiry, embedded in an action research approach, to facilitate practice development. Conclusions: This project added to the body of knowledge about midwifery twinning for building capacity in mentorship, research, and cross-cultural competence. MOMENTUM created a powerful community of practice that was enabling, fulfilling and transformative. Replication of this would require funding, management capacity and sufficient lead time for participatory planning and piloting. MOMENTUM’s audit tool was a bespoke design for this pilot project and so may not be transferable to other settings without further development, testing and validation. Implications for practice: •\tTwinning, action research, appreciative enquiry and workbased learning can be effective in enabling practice development •\tThe impact of midwifery twinning on leadership development requires further investigation, together with greater evidence on the reciprocal impact of twinning on the sending country

  9. ATEE Interactive Co-ordination and Educational Monitoring of Socrates Comenius Action 3 Projects.

    Science.gov (United States)

    Libotton, Arno; Van Braak, Johan; Garofalo, Mara

    2002-01-01

    Asserts that although the Comenius Action 3 courses were well-accepted and high quality, there is a need for a structure for easily monitoring and evaluating these projects. This article presents a pilot project designed with this purpose, which may be useful in implementing a system of coordination and communication among the different projects…

  10. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  11. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  12. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  13. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  14. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  15. Some Recurrent Disagreements about Social Change Which Affect Action Research Projects.

    Science.gov (United States)

    Hofstetter, Heather N.; Hofstetter, Merlin I.

    This paper describes the beliefs and values of a pluralistic approach to social change and of four competing approaches: social Darwinism, functionalism, militancy, and conflict theory. Stressing the alienation and dogmatism of the competing approaches, the authors relate each approach to its operation in community action projects. Social…

  16. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    International Nuclear Information System (INIS)

    Little, C.A.; Berven, B.A.; Carter, T.E.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards

  17. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  18. Success factors for international HTA projects: evaluating EUnetHTA Joint Action as an exemplar.

    Science.gov (United States)

    Guegan, Eleanor Woodford; Cook, Andrew

    2014-11-01

    Evaluation is essential for the management of international projects or networks in health technology assessment (HTA). It extends beyond the normal process of project management by incorporating qualitative dimensions and provides information about a project's effectiveness and achievements. This article aimed to identify the factors that are important for the success of international HTA projects. The European network for Health Technology Assessment Joint Action (EUnetHTA JA) is presented as an exemplar. METHODS for the evaluation of international HTA projects include interviews, focus groups, questionnaires, observations and documentary review, and the key points of these approaches have been summarized. The impact and effectiveness of the EUnetHTA JA was evaluated by questionnaires of project participants and external stakeholders, and by documentary review. The response rate for the three annual questionnaires sent to project participants ranged from 86 percent to 88 percent and for external stakeholders ranged from 65 percent to 88 percent. Key factors for project success included production of deliverables according to the workplan, achievement of objectives, added value generated, effective communication, involvement of external stakeholders, workstream management and progress from the preceding EUnetHTA 2006-2008 project. The experience of this project can inform the evaluation of future international HTA collaborations, such as the EUnetHTA 2nd Joint Action and HTAsiaLink. A high response rate was achieved to the self-completion questionnaires and the strategy followed is recommended for evaluation of international HTA projects. Future assessments of international HTA projects should strive to measure outcomes and impact, not just outputs and process.

  19. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  20. Surface water management at a mixed waste remediation site

    International Nuclear Information System (INIS)

    Schlotzhauer, D.S.; Warbritton, K.R.

    1991-01-01

    The Weldon Spring Remedial Action Project (WSSRAP) deals with chemical and radiological contaminants. MK-Ferguson Company is managing the project under contract with the US Department of Energy. Remedial activities include demolishing buildings, constructing material storage and staging areas, excavating and consolidating waste materials, and treating and disposing of the materials in a land disposal facility. Due to the excavation and construction required during remediation, a well-planned surface water management system is essential. Planning involves characterization of source areas and surface water transport mechanisms and identification of applicable regulations. System components include: erosion control sediment control, flow attenuation, and management of contaminated water. Combinations of these components may be utilized during actual construction and remediation to obtain optimum control. Monitoring is performed during implementation in order to assess the effectiveness of control measures. This management scheme provides for comprehensive management of surface water at this site by providing control and/or treatment to appropriate standards. Although some treatment methodologies for contaminated water are specific to site contaminants, this comprehensive program provides a management approach which is applicable to many remedial projects in order to minimize contaminant release and meet Clean Water Act requirements

  1. Determination of aerosol size distributions at uranium mill tailings remedial action project sites

    International Nuclear Information System (INIS)

    Newton, G.J.; Reif, R.H.; Hoover, M.D.

    1994-01-01

    The U.S. Department of Energy (DOE) has an ongoing program, the Uranium Mill Tailings Remedial Action (UMTRA) Project, to stabilize piles of uranium mill tailings in order to reduce the potential radiological hazards to the public. Protection of workers and the general public against airborne radioactivity during remedial action is a top priority at the UMTRA Project. The primary occupational radionuclides of concern are 230 Th, 226 Ra, 210 Pb, 210 Po, and the short-lived decay products of 222 Rn with 230 Th causing the majority of the committed effective dose equivalent (CEDE) from inhaling uranium mill tailings. Prior to this study, a default particle size of 1.0 μm activity median aerodynamic diameter (AMAD) was assumed for airborne radioactive tailings dust. Because of recent changes in DOE requirements, all DOE operations are now required to use the CEDE methodology, instead of the annual effective dose equivalent (AEDE) methodology, to evaluate internal radiation exposures. Under the transition from AEDE to CEDE, with a 1.0 μm AMAD particle size, lower bioassay action levels would be required for the UMTRA Project. This translates into an expanded internal dosimetry program where significantly more bioassay monitoring would be required at the UMTRA Project sites. However, for situations where the particle size distribution is known to differ significantly from 1.0 μm AMAD, the DOE allows for corrections to be made to both the estimated dose to workers and the derived air concentration (DAC) values. For particle sizes larger than 1.0 μm AMAD, the calculated CEDE from inhaling tailings would be relatively lower

  2. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date

  3. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    Science.gov (United States)

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  4. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    International Nuclear Information System (INIS)

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized

  5. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  6. Waste assessment chemical characterization of the Weldon Spring site Raffinate Pitts

    International Nuclear Information System (INIS)

    1989-08-01

    As part of the remedial investigation efforts conducted at the Weldon Spring Site Remedial Action project (WSSRAP), it was recognized that an assessment of the nature and extent of the types of waste in the Weldon Spring Raffinate Pits (WSRP) was necessary to evaluate treatment and disposal alternatives. A sampling plan was developed, therefore, which detailed sample locations, sample parameters, and sampling techniques. The sampling effort consisted of collecting 145 samples from 42 locations. The sampling locations were evenly distributed across each of the four raffinate pits in terms of both area and depth. The samples were analyzed for nitroaromatics, metals, inorganic anions, volatiles, semi-volatiles, PCBs/pesticides, oil and grease, total organic halogens, total organic carbon, cyanides and phenols. The data were then evaluated specific to each pit. At a later date the surface waters of each pit were sampled and similarly analyzed for metals. Samples were also analyzed for radiological contaminants. Information regarding radiological characterization is available in a companion report. 5 figs., 24 tabs

  7. Growing up with expectations. Better understanding the expectations of community partners in participatory action research projects

    Directory of Open Access Journals (Sweden)

    Clarissa Wilkinson

    2009-06-01

    Full Text Available This paper challenges the assumption that youth and youth agencies are in a condition of equality when entering a participatory action research (PAR. By asserting that it is not a state of equality that practitioners nor youth should assume nor be immediately striving for, but a consistently equitable process, this article draws from and reflects on the relationship between young people and researchers who have used a PAR methodology in action oriented projects. Using the UNESCO Growing up in Cities Canada project as a case example, this review extrapolates from and reflects on challenges faced by the project as a whole. Using semi-structured interviews to explore the roles of adults and youth, a number of strategies are highlighted as the techniques used to overcome these challenges. The discussion concludes with further reflection on the complexities of equality and equity, recommending a number of actions that have the potential to create an equitable environment in PAR projects similar to the one examined. Le présent article examine la condition supposée d’égalité des jeunes et des agences de jeunes engagés dans des projets participatifs de recherche-action. L’article se base sur la relation entre des jeunes et des chercheurs dans le cadre de démarches de recherche-action participative pour affirmer que ce n’est pas une condition d’égalité que les praticiens et les jeunes devraient assumer ou rechercher en premier lieu, mais plutôt des processus équitables. Le cas d’étude utilisé est le projet Grandir en Ville Canada, de l’UNESCO. À partir d’entrevues semi-dirigées visant à explorer les rôles des adultes et des jeunes, plusieurs stratégies employées pour surmonter les défis soulevés par le projet sont soulignées. L’article termine avec une réflexion sur les complexités de l’égalité et de l’équité, et propose plusieurs actions ayant le potentiel de créer un environnement d’équité lors des d

  8. Nurse-led action research project for expanding nurses′ role in patient education in Iran: Process, structure, and outcomes

    Directory of Open Access Journals (Sweden)

    Parvaneh Khorasani

    2015-01-01

    Full Text Available Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses′ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a "core research support team," "two steering committees," and community representatives of clients and professionals as "feedback groups." A seven-stage process, named the "Nurse Educators: Al-Zahra Role Expansion Action Research" (NEAREAR process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic-clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses′ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  9. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    Science.gov (United States)

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  10. Nurse-led action research project for expanding nurses' role in patient education in Iran: Process, structure, and outcomes.

    Science.gov (United States)

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses' role in patient education in Iran. This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a "core research support team," "two steering committees," and community representatives of clients and professionals as "feedback groups." A seven-stage process, named the "Nurse Educators: Al-Zahra Role Expansion Action Research" (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. A nurse-led ad hoc structure with academic-clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses' educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system policy makers in a wider range of practice.

  11. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  12. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1996-01-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project

  13. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    International Nuclear Information System (INIS)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized

  14. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    Science.gov (United States)

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  15. Action Memorandum for Decommissioning the Engineering Test Reactor Complex under the Idaho Cleanup Project

    International Nuclear Information System (INIS)

    A. B. Culp

    2007-01-01

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared and released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessel. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface

  16. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    Science.gov (United States)

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded by…

  17. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    Science.gov (United States)

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  18. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  19. Corrective action program reengineering project

    International Nuclear Information System (INIS)

    Vernick, H.R.

    1996-01-01

    A series of similar refueling floor events that occurred during the early 1990s prompted Susquehanna steam electric station (SSES) management to launch a broad-based review of how the Nuclear Department conducts business. This was accomplished through the formation of several improvement initiative teams. Clearly, one of the key areas that benefited from this management initiative was the corrective action program. The corrective action improvement team was charged with taking a comprehensive look at how the Nuclear Department identified and resolved problems. The 10-member team included management and bargaining unit personnel as well as an external management consultant. This paper provides a summary of this self-assessment initiative, including a discussion of the issues identified, opportunities for improvement, and subsequent completed or planned actions

  20. Programmatic Environmental Report for remedial actions at UMTRA [Uranium Mill Tailings Remedial Action] Project vicinity properties

    International Nuclear Information System (INIS)

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs

  1. Action research: Scandinavian Experiences

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard

    2004-01-01

    The article focus on paradigms, methods and ethics of action research in the Scandinavian countries. The special features of the action research paradigm is identified. A historical overview follows of some main action research projects in Norway, Sweden and Denmark. The tendency towards upsclae...... action research projects from organisational or small community projects yo large-scale, regional based network apporaches are also outlined and discussed. Finally, a synthesised approach of the classical, socio-technical action research approach and the large-scale network and holistic approaches...

  2. Mathematics in Action

    DEFF Research Database (Denmark)

    December 2004-November 2007 Denmark, Hungary, Lithuania, the Netherlands, Norway, Slovenia and Spain have cooperated in the project Mathematics in Action (MiA). The MiA project is supported by the Grundtvig action in the Socrates program of the European Commission. The aim of the project...

  3. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  4. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  5. Critical management issues for the Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    Themelis, J.G.; Krishnan, K.R.

    1985-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (PL95-604) authorized the Secretary of Energy to enter into cooperative agreements with certain states and Indian Tribes to clean up 24 inactive uranium mill tailing sites and associated vicinity properties. The Uranium Mill Tailings Remedial Action (UMTRA) Project includes the three Federal agencies (EPA, DOE, and NRC), eleven state, Indian Tribes, and at least four major contractors. The UMTRA Project extends over a period of ten years. The standards for the Project require a design life of 1000 years with a minimum performance period of 200 years. This paper discusses the critical management issues in dealing with the UMTRA Project and identifies the development of solutions for many of those issues. The highlights to date are promulgation of EPA standards, continued support from Congress and participating states and Indian Tribes, significant leadership shown at all levels, establishment of credibility with the public, and continued motivation of the team. The challenge for tomorrow is making certain NRC will license the sites and maintaining the high level of coordination exhibited to date to assure Project completion on schedule

  6. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area at the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  7. Civic Action Projects Report, 1 January 1965-31 December 1965. Volume 1

    Science.gov (United States)

    1966-06-22

    construcELon and ship repair facilities in Argentina, the Navy utilizes its facilities, on a non-competitive basis with civilian industry , tr repair...been quite industrious during the past year. The following projects were supported by the committee, with excellent results: a. Potable water...the Escuela Militär de Ingenieria , to provide a basic reference lihrary on civic action. 9. PROBLEM AREAS. Seme excellent press releases have been

  8. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  9. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    Science.gov (United States)

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  10. Re-Placing the Arts in Elementary School Curricula: An Interdisciplinary, Collaborative Action Research Project

    Science.gov (United States)

    Trent, Allen; Riley, Jorge-Ayn

    2009-01-01

    This article describes a collaborative action research project aimed at deliberately "re-placing" art in the elementary curriculum through targeted planning, implementation, and assessment of an art integrated unit in an urban 4th grade classroom. Findings and implications should be relevant to elementary teachers, administrators, art specialists,…

  11. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state's 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs

  12. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    International Nuclear Information System (INIS)

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification

  13. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  14. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  15. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant

  16. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work

  17. Engaging Key Stakeholders in Climate Change: A Community-Based Project for Youth-Led Participatory Climate Action

    Science.gov (United States)

    Trott, Carlie D.

    Few studies have examined how youth think about, and take action on climate change and far fewer have sought to facilitate their engagement using participatory methods. This dissertation evaluated the impacts of Science, Camera, Action! (SCA), a novel after-school program that combined climate change education with participatory action through photovoice. The specific aims of this study were to: (1) Evaluate the impacts of SCA on youth participants' climate change knowledge, attitudes, and behaviors; (2) Examine how SCA participation served to empower youth agency; and (3) Explore SCA's influence on youths' science engagement. Participants were 55 youths (ages 10 to 12) across three Boys and Girls Club sites in Northern Colorado. SCA's Science component used interactive activities to demonstrate the interrelationships between Earth's changing climate, ecosystems, and sustainable actions within communities. Photovoice, SCA's Camera component, was used to explore youths' climate change perspectives and to identify opportunities for their active engagement. Finally, SCA's Action component aimed to cultivate youth potential as agents of change in their families and communities through the development and implementation of youth-led action projects. Action projects included local policy advocacy, a tree-planting campaign, a photo gallery opening, development of a website, and the establishment of a Boys and Girls Club community garden. To evaluate SCA impacts, a combination of survey and focus group methods were used. Following the program, youth demonstrated increased knowledge of the scientific and social dimensions of the causes and consequences of climate change, as well as its solutions through human action. Though participants expressed a mix of positive (e.g., hope) and negative (e.g., sadness) emotions about climate change, they left the program with an increased sense of respect for nature, an enhanced sense of environmental responsibility, and a greater sense

  18. Actions to reduce the impact of construction products on indoor air: Outcomes of the European Project HealthyAir

    NARCIS (Netherlands)

    Bluyssen, P.M.; Richemont, S.de; Crump, D.; Maupetit, F.; Witterseh, T.; Gajdos, P.

    2010-01-01

    The European project - HealthyAir is a network project involving six institutions in Europe on actions and activities that address the effects of construction products on indoor air. Different ways to improve indoor air quality were reviewed, ranging from source control to education of occupants on

  19. Teachers’ Stories of Engaging Students in Controversial Action Projects on the Island of Ireland

    Directory of Open Access Journals (Sweden)

    Majella McSharry

    2016-06-01

    Full Text Available Civic, Social and Political Education (CSPE in the Republic of Ireland and Local and Global Citizenship (LGC in Northern Ireland keenly promote students’ active participation in society. However, the purpose of this participation is not necessarily to encourage students to campaign for change in the present but rather that ‘students are given opportunities to engage in actions and develop skills that will contribute to their becoming active participatory citizens in later life’ (NCCA (2005 CSPE Guidelines for Teachers, p. 59. This often gives rise to a culture of passive citizenship and a tendency to focus on ‘action projects’ that are safe and self-contained. This paper focuses on a five action projects carried out by a sample of teachers and students that may be considered ‘controversial’. In each case students actively campaign for equality and social justice, on local or global human rights issues and in ways that may be deemed controversial. It examines how the mainstream curriculum and school structures facilitate or impede this type of controversial action and explores the potential opportunities for greater engagement in such action through proposed curriculum reform.

  20. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  2. Interdisciplinary Action in Halls of EJA: the projects work in the light of focus-cultural history

    Directory of Open Access Journals (Sweden)

    Cyntia Graziella Guizelim Simões Girotto

    2009-11-01

    Full Text Available This article aims to discuss the organization of work teaching in classrooms of Pejão (Program of Education for Youth and Adult - Unesp - Linda through the Work Projects, which underlie actions from the perspective of interdisciplinary Theory History-Culture. Pointing to the pedagogical implications of this conception of education, considering the formation of educating young adults and forth the use of time and space for education, production of knowledge, the procedure to information given to school subjects, the development / implementation / development / evaluation of projects of interdisciplinary work in the light of the focus vygotiskiano. Therefore, our gaze is theoretical and methodological back-up for a particular context: the classes of its shares in EJA interdisciplinary. Discuss such issues as follows: the first section, we present the general theory, discussing key concepts such as mediation, activity, learning, development, and then inserted the actions of students and educators of EJA. In a second section, we draw some lessons of that theory, to (re present and (re thinking projects in the EJA, resignified and resizing them by vygotiskiano bias.

  3. Uranium Mill Tailings Remedial Action Project Vicinity Property Program

    International Nuclear Information System (INIS)

    Little, L.E.; Potter, R.F.; Arpke, P.W.

    1988-01-01

    The Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Grand Junction Project Vicinity Property Program is a $165 million program for the removal and disposal of uranium mill tailings that were used in the construction of approximately 4,000 residences, commercial buildings, and institutional facilities in the City of Grand Junction and surrounding Mesa County, Colorado. This paper discusses the UMTRA Vicinity Property Program and the economic benefits of this program for the City of Grand Junction and Mesa County, Colorado. The Bureau of Reclamation Economic Assessment Model (BREAM) was used to estimate the increases in employment and increases in personal income in Mesa County that result from the Vicinity Property Program. The effects of program-related changes in income and taxable expenditures on local and state tax revenue are also presented

  4. Shared voices, different worlds: Process and product in the Food Dignity action research project

    Directory of Open Access Journals (Sweden)

    Christine M. Porter

    2014-06-01

    Full Text Available Diversity of perspective makes for greater depth when painting a portrait of community life. But embracing the idea of representing true diversity in a formal research project is a whole lot easier than putting it into practice. The three dozen members of the Food Dignity action research team, now entering the fourth year of a five-year project, are intimately familiar with this challenge. In this article, four of the collaborators explore the intricacies of navigating what it means to bring together a genuine cross-section of community-based activists and academics in an effort to draw on one another’s professional and personal strengths to collect and disseminate research findings that represent the truth of a community’s experiences, and are ultimately disseminated in a way that brings tangible benefit to the heart and soul of that community. The authors include Food Dignity’s principal investigator (Porter and three community organisers (Marshall, Herrera and Woodsum in organisations that have partnered with Food Dignity. Two of the organisers (Herrera and Woodsum also serve project-wide roles. These collaborators share their personal and professional hopes, struggles, concerns, successes and failures as participants in this cutting-edge effort to equalise community and university partnerships in research. Keywords: community-based participatory research (CBPR, food justice, equitable community-campus partnerships, food sovereignty, case study, action research

  5. Exploring teachers' beliefs and knowledge about scientific inquiry and the nature of science: A collaborative action research project

    Science.gov (United States)

    Fazio, Xavier Eric

    Science curriculum reform goals espouse the need to foster and support the development of scientific literacy in students. Two critical goals of scientific literacy are students' engagement in, and developing more realistic conceptions about scientific inquiry (SI) and the nature of science (NOS). In order to promote the learning of these curriculum emphases, teachers themselves must possess beliefs and knowledge supportive of them. Collaborative action research is a viable form of curriculum and teacher development that can be used to support teachers in developing the requisite beliefs and knowledge that can promote these scientific literacy goals. This research study used a collective case study methodology to describe and interpret the views and actions of four teachers participating in a collaborative action research project. I explored the teachers' SI and NOS views throughout the project as they investigated ideas and theories, critically examined their current curricular practice, and implemented and reflected on these modified curricular practices. By the end of the research study, all participants had uniquely augmented their understanding of SI and NOS. The participants were better able to provide explanatory depth to some SI and NOS ideas; however, specific belief revision with respect to SI and NOS ideas was nominal. Furthermore, their idealized action research plans were not implemented to the extent that they were planned. Explanations for these findings include: impact of significant past educational experiences, prior understanding of SI and NOS, depth of content and pedagogical content knowledge of the discipline, and institutional and instructional constraints. Nonetheless, through participation in the collaborative action research process, the teachers developed professionally, personally, and socially. They identified many positive outcomes from participating in a collaborative action research project; however, they espoused constraints to

  6. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  7. Remedial investigation for the chemical plant area of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) is responsible for management of the Weldon Spring Site Remedial Action Project (WSSRAP) under its Environmental Restoration and Waste Management Program. Major goals include eliminating potential public and environmental hazards due to site contamination and releasing the property for alternate uses to the maximum extent practicable. The purpose of the remedial investigation described in this report was to determine the extent of contamination associated with the portion of the Weldon Spring site known as the chemical plant and raffinate pit area. The DOE has assumed responsibility for investigating and remediating all on-site soil contamination and off-site soil which is radiologically contaminated as a result of uranium and thorium processing operations. The DOE has also assumed the responsibility for radiologically contaminated groundwater on and off site. The Weldon Spring site remedial investigation also involved the evaluation of the sources, nature and extent, and environmental fate and transport of contaminants to provide a basis for defining the risks that the contaminants may pose to human health and the environment. Data are included in this report to support the screening of remedial technologies and to permit the development and detailed analysis of alternatives for remedial action at the site during the feasibility study process

  8. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 2

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities. One of the first steps in the UMTRA Ground Water Project is the preparation of the Programmatic Environmental Impact Statement (PEIS). This report contains the comments and responses received on the draft PEIS

  9. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  10. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  11. Students Development of Food and Health-Related Action Competence - Upscaling LOMA Project

    DEFF Research Database (Denmark)

    Ruge, Dorte; Nielsen, Morten Kromann; Jensen, Kirsten

    , based on preliminary results from LOMA I project, there are indications, that students at the whole school develop healthier eating habits and experience comensality, Sense of Coherence and QOL, when they participate in LOMA educational activities. The evaluation of LOMA II will apply a mixed methods......, that encompass participation from both teachers, pedagogs and students (8-15 years) and teacher-students.The evaluation of LOMA II will apply a mixed methods design, that facilitates a 'realist' (Pawson and Tilley 1998; Carlsson and Simovska 2012) approach to data collection and analysis. Apart from more...... mainstream methods of measurement, action research strategies (Checkland 2000) will be applied at certain stages of the evaluation, e.g. during pilot-projets and in relation to students participation in the 'mid-term-seminar' of the project in 2016. Expected Outcomes It is expected, that LOMA II...

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort

  13. The influence of perceived uncertainty on entrepreneurial action in emerging renewable energy technology; biomass gasification projects in the Netherlands

    International Nuclear Information System (INIS)

    Meijer, Ineke S.M.; Hekkert, Marko P.; Koppenjan, Joop F.M.

    2007-01-01

    Emerging renewable energy technologies cannot break through without the involvement of entrepreneurs who dare to take action amidst uncertainty. The uncertainties that the entrepreneurs involved perceive will greatly affect their innovation decisions and can prevent them from engaging in innovation projects aimed at developing and implementing emerging renewable energy technologies. This article analyzes how perceived uncertainties and motivation influence an entrepreneur's decision to act, using empirical data on biomass gasification projects in the Netherlands. Our empirical results show that technological, political and resource uncertainty are the most dominant sources of perceived uncertainty influencing entrepreneurial decision-making. By performing a dynamic analysis, we furthermore demonstrate that perceived uncertainties and motivation are not stable, but evolve over time. We identify critical factors in the project's internal and external environment which influence these changes in perceived uncertainties and motivation, and describe how various interactions between the different variables in the conceptual model (internal and external factors, perceived uncertainty, motivation and previous actions of the entrepreneurs) positively or negatively influence the decision of entrepreneurs to continue entrepreneurial action. We discuss how policymakers can use these insights for stimulating the development and diffusion of emerging renewable energy technologies

  14. Analysis of expert opinion on uranium mill tailings remedial action project (UMTRAP) alternatives: a decision-support-system pilot study

    International Nuclear Information System (INIS)

    Thode, E.F.

    1983-01-01

    The Uranium Mill Tailings Remedial Action Project requires a specific remedial action individually chosen for each site. A panel of professionals was asked to rate objectives for remedial action and to rank alternatives for meeting the objectives. Responses were statistically analyzed. The panel's preference was earth cover in place at the Salt Lake City, Utah, and Shiprock, New Mexico, sites. Asphalt cover was next at Salt Lake City. This decision support system is appropriate for use with other inactive and active tailings sites

  15. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  16. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    Science.gov (United States)

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  17. PROJECT BASED LEARNING (PBL TO IMPROVE PSYCHOMOTORIC SKILLS: A CLASSROOM ACTION RESEARCH

    Directory of Open Access Journals (Sweden)

    W. Sumarni

    2016-10-01

    Full Text Available This paper discusses the application of project-based learning (PBL to improve student’ psychomotor skills and concept understanding, as well as knowing what PBL contribution to the improvement of student’ psychomotor skills in chemistry learning. The study was conducted in three cycles. Each cycle consisted of planning, implementation, observation, and reflection steps. One set of data consists of student’ psychomotor skills assesment, student’ conceptual understanding and questionnaire responses were obtained from the action research. Learning process was performed in the eleventh grade students included 37 students (10 males and 27 females and 3 collaborators. The successful research was indicated by 85% of students achieve the mastery learning on concept understanding and well on psychomotor aspects. Data collection was performed using documentation method by questionnaire, observations, and tests. Data was analyzed quantitatively and qualitatively. The results show that all aspects of the psychomotor assessed include sets, mechanical response, complex response, adaptation, and origination were in high category. At the end of the lesson, the project assigned to students were evaluated jointly between teachers and students. The project results in the form of a series of distillation apparatus is applied to separate the natural compounds.

  18. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  19. Pengaruh Aida (Attention, Interest, Desire, Action) Terhadap Efektifitas Iklan Online (Survei Pada Pembeli Di Toko Online Adorable Project)

    OpenAIRE

    Johar, Diah Syafita

    2015-01-01

    This research aims to describe the factors determining of models of AIDA (attention, interest, desire, action), to describe the influence of AIDA (Attention, Interest, Desire, Action) toward online advertising, and to describe the most dominant AIDA factor toward online advertising. The result of this research based on 145 buyers of online shop Adorable Project With factor and mulitiple linear regression analysis the result of this research is formed four new factor named interest, desire, ac...

  20. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices

  1. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  2. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  3. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [US Department of Energy, Washington, DC (United States).Office of Legacy Management

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  4. Practicum in adapted physical activity: a Dewey-inspired action research project.

    Science.gov (United States)

    Standal, Øyvind; Rugseth, Gro

    2014-07-01

    The purpose of this study was to investigate what adapted physical activity (APA) students learn from their practicum experiences. One cohort of APA students participated, and data were generated from an action research project that included observations, reflective journals, and a focus group interview. The theoretical framework for the study was Dewey's and Wackerhausen's theories of reflections. The findings show the objects of students' reflections, the kind of conceptual resources they draw on while reflecting, and their knowledge interests. In addition, two paradoxes are identified: the tension between reflecting from and on own values, and how practicum as a valued experience of reality can become too difficult to handle. In conclusion, we reflect on how practicum learning can be facilitated.

  5. "Someone Had to Have Faith in Them as Professionals": An Evaluation of an Action Research Project to Develop Educational Leadership across the Early Years

    Science.gov (United States)

    Henderson, Linda

    2017-01-01

    This article reports on an evaluation of three action research projects developed by a group of teachers working across the early years in three independent schools. The article examines the role of action research in developing educational leadership capabilities. Drawing on the educational leadership literature, concepts and ideas of action and…

  6. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  7. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  8. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  9. Designing Internet Learning for Novice Users -Paper Based on a Action Research Project In India

    DEFF Research Database (Denmark)

    Purushothaman, Aparna

    2012-01-01

    The paper centre on an Action Research project undertaken in India for enabling the female students empowered through Internet use. The paper will discuss the design elements of Internet training for the first time users with limited Internet access based on Blooms Digital Taxonomy of Learning...... Domains.The paper also illustrates the identity formation of students, through learning to use Internet, using wengers social theory of learning with the empirical data....

  10. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown

  11. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    Science.gov (United States)

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  12. Empowering Language Learners through the Use of a Curriculum-Integrated Information Literacy Programme: An Action Research Project

    Science.gov (United States)

    Alzahrani, Sahar

    2017-01-01

    This paper implements and evaluates a curriculum-integrated information literacy programme in an Arabic primary school in the United Kingdom to empower learners and develop life-long learning skills. It reports on an action research project with a reflective practice approach used at the beginning of the semester to identify potential problems…

  13. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  14. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information

  15. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  16. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  17. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    Science.gov (United States)

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  18. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  19. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    Science.gov (United States)

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...

  20. Turning the Co-Production Corner: Methodological Reflections from an Action Research Project to Promote LGBT Inclusion in Care Homes for Older People

    Science.gov (United States)

    Almack, Kathryn; Simpson, Paul; Billings, Barbara; Mall, Naresh

    2018-01-01

    Background: Older lesbian, gay, bisexual and trans (LGBT) residents are often invisible in long-term care settings. This article presents findings from a community-based action research project, which attempted to address this invisibility through co-produced research with LGBT community members. Particular Question: What conditions enable co-produced research to emerge in long-term residential care settings for older people? Aims of Project: To analyse outcomes and challenges of action-oriented, co-produced research in the given context. In particular, we explore how co-production as a collaborative approach to action-orientated research can emerge during the research/fieldwork process; and reflect critically on the ethics and effectiveness of this approach in advancing inclusion in context. Methods: The project was implemented across six residential care homes in England. Reflections are based on qualitative evaluation data gathered pre- and post-project, which includes 37 interviews with care home staff, managers and community advisors (two of whom are co-authors). Results and Conclusions: We discuss how the co-production turn emerged during research and evaluate how the politics of this approach helped advance inclusion—itself crucial to well-being. We argue for the value of co-produced research in instigating organizational change in older people’s care environments and of non-didactic storytelling in LGBT awareness-raising amongst staff. PMID:29642460

  1. Turning the Co-Production Corner: Methodological Reflections from an Action Research Project to Promote LGBT Inclusion in Care Homes for Older People.

    Science.gov (United States)

    Willis, Paul; Almack, Kathryn; Hafford-Letchfield, Trish; Simpson, Paul; Billings, Barbara; Mall, Naresh

    2018-04-07

    Background : Older lesbian, gay, bisexual and trans (LGBT) residents are often invisible in long-term care settings. This article presents findings from a community-based action research project, which attempted to address this invisibility through co-produced research with LGBT community members. Particular Question: What conditions enable co-produced research to emerge in long-term residential care settings for older people? Aims of Project: To analyse outcomes and challenges of action-oriented, co-produced research in the given context. In particular, we explore how co-production as a collaborative approach to action-orientated research can emerge during the research/fieldwork process; and reflect critically on the ethics and effectiveness of this approach in advancing inclusion in context. The project was implemented across six residential care homes in England. Reflections are based on qualitative evaluation data gathered pre- and post-project, which includes 37 interviews with care home staff, managers and community advisors (two of whom are co-authors) . Results and Conclusions: We discuss how the co-production turn emerged during research and evaluate how the politics of this approach helped advance inclusion-itself crucial to well-being. We argue for the value of co-produced research in instigating organizational change in older people's care environments and of non-didactic storytelling in LGBT awareness-raising amongst staff.

  2. Turning the Co-Production Corner: Methodological Reflections from an Action Research Project to Promote LGBT Inclusion in Care Homes for Older People

    Directory of Open Access Journals (Sweden)

    Paul Willis

    2018-04-01

    Full Text Available Background: Older lesbian, gay, bisexual and trans (LGBT residents are often invisible in long-term care settings. This article presents findings from a community-based action research project, which attempted to address this invisibility through co-produced research with LGBT community members. Particular Question: What conditions enable co-produced research to emerge in long-term residential care settings for older people? Aims of Project: To analyse outcomes and challenges of action-oriented, co-produced research in the given context. In particular, we explore how co-production as a collaborative approach to action-orientated research can emerge during the research/fieldwork process; and reflect critically on the ethics and effectiveness of this approach in advancing inclusion in context. Methods: The project was implemented across six residential care homes in England. Reflections are based on qualitative evaluation data gathered pre- and post-project, which includes 37 interviews with care home staff, managers and community advisors (two of whom are co-authors. Results and Conclusions: We discuss how the co-production turn emerged during research and evaluate how the politics of this approach helped advance inclusion—itself crucial to well-being. We argue for the value of co-produced research in instigating organizational change in older people’s care environments and of non-didactic storytelling in LGBT awareness-raising amongst staff.

  3. Action research in inter-organisational networks

    DEFF Research Database (Denmark)

    Goduscheit, René Chester; Rasmussen, Erik Stavnsager; Jørgensen, Jacob Høj

    2007-01-01

    Traditionally, the literature on action research has been aimed at intra-organisational issues. These studies have distinguished between two researcher roles: The problem-solver and the observer. This article addresses the distinct challenges of action research in inter-organisational projects....... In addition to the problem-solver and observer roles, the researcher in an inter-organisational setting can serve as a legitimiser of the project and manage to involve partners that in an ordinary business-to-business setting would not have participated. Based on an action research project in a Danish inter......-organisational network, this article discusses potential pitfalls in the legitimiser role. Lack of clarity in defining the researcher role and project ownership in relation to the funding organisation and the rest of the network can jeopardise the project and potentially the credibility of the researchers. The article...

  4. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    Science.gov (United States)

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  5. Action Research as a Network

    DEFF Research Database (Denmark)

    Boulus-Rødje, Nina

    2012-01-01

    This paper explores roles and interventions in IS action research. I draw upon a four-year research project about electronic medical records, conducted in close collaboration with a community partner. Following a self-reflexive stance, I trace the trajectory of the research engagement...... and the different roles I occupied. To better understand the complex nature of collaboration found within action research projects, I propose conceptualizing action research as a network. The network framework directs our attention to the collective production and the conditions through which roles...... this influences the researcher’s agency....

  6. Overview of uranium mill tailings remedial action project of the United States of America 1995-1996

    International Nuclear Information System (INIS)

    Edge, R.

    1997-01-01

    From the early 1940's through the 1960's the United States federal government contracted for processed uranium ore for national defense research, weapons development and commercial nuclear energy. When these contracts were terminated, the mills ceased operation leaving large uranium tailings on the former mill sites. The purpose of the Uranium Remedial Action Project (UMTRA) is to minimize or eliminate potential health hazards resulting from exposure of the public to the tailings at these abandons sites. There are 24 inactive uranium mill tailings sites, in 10 states and an Indian reservation lands, included for clean up under the auspices of UMTRA. Presently the last 2 sites are under remediation. This paper addresses the progress of the project over the last two years. (author)

  7. Mental health promotion in a school community by using the results from the Well-being Profile: an action research project.

    Science.gov (United States)

    Puolakka, Kristiina; Haapasalo-Pesu, Kirsi-Maria; Konu, Anne; Astedt-Kurki, Päivi; Paavilainen, Eija

    2014-01-01

    This article presents an action research project as a method to combine science and practical expertise in order to develop the practices of the health care system. The project aimed at developing mental health promotion in the school community in general and at finding tools for timely help when mental health is at risk. The underlying idea is that mental health is an integral part of health and by promoting general well-being it is also possible to promote and ensure mental health at school. The study was conducted in a Finnish lower secondary school of 446 pupils where the pupils are aged between 12 and 15 years. The initial survey was conducted using the School Well-being Profile, a tool developed by Anne Konu. A well-being questionnaire was used to identify the areas in need of improvement, providing the basis for planning and implementing development measures together with the local actors. The instrument proved to be a usable way of collecting feedback of the well-being of the school environment. As a result of the action research project, the school's physical conditions and social relationships improved and appropriate practices for future problem situations were set.

  8. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  9. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  10. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  11. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  12. ECOWindS Joint Action Plan

    DEFF Research Database (Denmark)

    2014-01-01

    The Joint Action Plan (JAP) is a deliverable of the ECOWindS project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. The objective of the JAP is to be an international...

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  14. Engagement enacted: Essentials of initiating an action research project

    NARCIS (Netherlands)

    Prof Tineke Abma; Dr Theo Niessen; Drs Miranda Snoeren

    2011-01-01

    Engagement is seen as an important characteristic of action research. The term is often used to refer to the participation and involvement of the research participants. Within this article we take another angle and explore the concept of engagement in relation to the main action researcher. Using an

  15. Engagement enacted: Essentials of initiating an action research project

    NARCIS (Netherlands)

    Snoeren, M.M.W.C.; Niessen, T.J.H.; Abma, T.A.

    2012-01-01

    Engagement is seen as an important characteristic of action research. The term is often used to refer to the participation and involvement of the research participants. Within this article we take another angle and explore the concept of engagement in relation to the main action researcher. Using an

  16. Teachers in Action Research: Assumptions and Potentials

    Science.gov (United States)

    Li, Yuen-Ling

    2008-01-01

    Research literature has long indicated that action research may stimulate practitioners themselves to actively evaluate the quality of their practice. This study is designed to report the use of action research for the development of early years professional practice by analyzing the pre-project and the post-project video-filmed teaching events.…

  17. 1992 North Dakota Economic Impact Study for the Uranium Mill Tailings Remedial Action Project, Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1993-01-01

    The goal of the Uranium Mill Tailings Remedial Action (UMTRA) Project in North Dakota is to improve the environment and reduce the negative health effects associated with residual radioactive material (RRM) from the inactive processing sites at Belfield and Bowman, North Dakota. A secondary benefit of the UMTRA Project is economic gain. The 1992 North Dakota Economic Impact Study (NDEIS) analyzes the impact of the remedial actions at the inactive Belfield and Bowman processing sites and their associated vicinity properties. This analysis is based on the assumption that the state of North Dakota will provide 10 percent of the funding required for remediation. For every dollar the state of North Dakota invests in the Belfield and Bowman onsite portion of the UMTRA Project, it will realize $5.04 in gross labor income (i.e., gross labor income divided by the state's total funding requirement). For every dollar the state of North Dakota invests, it will realize a net return of $3.04 (i.e., net benefit divided by the state's total funding requirement). This reflects only labor expenditure and employment impact. ff state and local non-labor tax benefits were considered in the net economic benefit, North Dakota could receive significantly more than $3.04 for each dollar it invests. The UMTRA Project work at Belfield and Bowman will benefit the state of North Dakota. Benefits include a reduction in the negative health effects caused by low-level RRM, an improvement in the environment, and increased economic growth

  18. Multimodal responsive action

    DEFF Research Database (Denmark)

    Oshima, Sae

    ; Raymond 2003; Schegloff and Lerner 2009), including those with multimodal actions (e.g. Olsher 2004; Fasulo & Monzoni 2009). Some responsive actions can also be completed with bodily behavior alone, such as: when an agreement display is achieved by using only nonvocal actions (Jarmon 1996), when...... the recipient’s gaze shift becomes a significant part of the speaker’s turn construction (Goodwin 1980), and when head nods show the recipient’s affiliation with the speaker’s stance (Stivers 2008). Still, much room remains for extending our current understanding of responding actions that necessarily involve...... a hairstylist and a client negotiate the quality of the service that has been provided. Here, the first action is usually the stylist’s question and/or explanation of the new cut that invites the client’s assessment/(dis)agreement, accompanied with embodied actions that project an imminent self...

  19. Action-based flood forecasting for triggering humanitarian action

    Science.gov (United States)

    Coughlan de Perez, Erin; van den Hurk, Bart; van Aalst, Maarten K.; Amuron, Irene; Bamanya, Deus; Hauser, Tristan; Jongma, Brenden; Lopez, Ana; Mason, Simon; Mendler de Suarez, Janot; Pappenberger, Florian; Rueth, Alexandra; Stephens, Elisabeth; Suarez, Pablo; Wagemaker, Jurjen; Zsoter, Ervin

    2016-09-01

    Too often, credible scientific early warning information of increased disaster risk does not result in humanitarian action. With financial resources tilted heavily towards response after a disaster, disaster managers have limited incentive and ability to process complex scientific data, including uncertainties. These incentives are beginning to change, with the advent of several new forecast-based financing systems that provide funding based on a forecast of an extreme event. Given the changing landscape, here we demonstrate a method to select and use appropriate forecasts for specific humanitarian disaster prevention actions, even in a data-scarce location. This action-based forecasting methodology takes into account the parameters of each action, such as action lifetime, when verifying a forecast. Forecasts are linked with action based on an understanding of (1) the magnitude of previous flooding events and (2) the willingness to act "in vain" for specific actions. This is applied in the context of the Uganda Red Cross Society forecast-based financing pilot project, with forecasts from the Global Flood Awareness System (GloFAS). Using this method, we define the "danger level" of flooding, and we select the probabilistic forecast triggers that are appropriate for specific actions. Results from this methodology can be applied globally across hazards and fed into a financing system that ensures that automatic, pre-funded early action will be triggered by forecasts.

  20. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  1. 1992 Colorado Economic Impact Study for the US Department of Energy and Colorado Department of Health Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    1991-01-01

    The findings of the 1992 Colorado Economic Impact Study (CEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Project are outlined below. All dollar amounts used in the study are in year-of-expenditure dollars. The total funding requirement for the State of Colorado for the UMTRA Project is estimated to be $66.8 million, or 10 percent of the remedial action costs for the UMTRA Project in Colorado. The UMTRA Project will generate $487.5 million in gross labor income in Colorado between 1983 and 1996. This includes $54.4 million in state and local tax revenues and $41.2 million in federal individual income tax revenues. The net economic benefit of the UMTRA Project to Colorado is $355.1 million. For every dollar the State of Colorado invests in the UMTRA Project, it will realize $5.32 in gross labor income. The employment impact to the Western Slope region is significant. The UMTRA Project will create a total employment impact of 13,749 fulltime equivalents (FTES) spread over. a period of 13 years in seven site areas. Nearly 100 percent of the labor will be drawn from the local communities. The State of Colorado's Western Slope is anticipated to be minimally impacted by the phaseout of the UMTRA Project. Unlike industries that shut down operations without warning, the UMTRA Project workers, local government, and businesses know the schedule for completion and can consider and prepare for the impact of UMTRA Project conclusion. Further, because the majority of the work force is local, there has not been a significant investment in each community's infrastructure. Any small increases in the infrastructure will not be abandoned at the end of the UMTRA Project due to a marked increase in migration out of the local community

  2. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  3. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  4. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  5. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  6. DisseminACTION: disseminating science in the information age (www.action-euproject.eu: a website for researchers and parents)

    OpenAIRE

    Matteo Mauri

    2015-01-01

    www.action-euproject.eu is a website designed at the University of Cagliari, by the Department of Surgery, Faculty of Medicine, within the projectACTION – Aggression in Children: unravelling gene-environment interplay to inform Treatment and InterventiON strategies”, a collaborative project which includes twelve international partners, funded under the 7th Framework Programme for Research, technological Development and Demonstration.Its aim is to properly disseminate official news, events, ...

  7. Remedial action and waste disposal project -- 100-DR-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    April, J.G.; Ard, J.A.; Corpuz, F.M.; DeMers, S.K.; Donahoe, R.L.; Frank, J.M.; Hobbs, B.J.; Roeck, F.V.

    1997-02-01

    This readiness assessment report presents the results of the project readiness assessment for the 100-DR-1 source sites remediation. The assessment was conducted at the conclusion of a series of project activities that began in August 1996. These activities included confirming the completion of project-specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, and mobilization and construction of site support systems

  8. Are REDD+ community forest projects following the principles for collective action, as proposed by Ostrom?

    Directory of Open Access Journals (Sweden)

    Abdul-Razak Saeed

    2017-03-01

    Full Text Available Forested countries in the global south that have agreed to engage in REDD+, a policy mechanism for addressing climate change, are receiving support to improve laws, policies, systems and structures. As a mechanism initiated at the global level and seeking to use forests to address a global commons crisis (atmospheric carbon concentration, understanding how REDD+ translates into implementation at the local level is essential. Therefore, using a systematic review approach, we examined 15 studies of REDD+ in the context of public and/or community managed forests, drawn from a comprehensive application of inclusion criteria to identify relevant published peer-reviewed empirical research. The common property resources literature was used to highlight the role of local institutions in REDD+ and to distil how REDD+ community forest projects conform to Ostrom’s collective action principles. The review revealed limited sharing of information and decision-making authority with communities; a general absence of FPIC; and a lack of defined benefit sharing and conflict resolution arrangements in many of the REDD+ projects.

  9. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities by meeting Environmental Protection Agency (EPA) ground water standards. One of the first steps in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). The EPA standards allow the use of different strategies for achieving compliance with the standards. This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. Each of the four alternatives evaluated in the PEIS is based on a different mix of strategies to meet EPA ground water standards. The PEIS is intended to serve as a programmatic planning document that provides an objective basis for determining site-specific ground water compliance strategies and data and information that can be used to prepare site-specific environmental impact analyses more efficiently. DOE will prepare appropriate further National Environmental Policy Act documentation before making site-specific decisions to implement the Ground Water Project. Affected States, Tribes, local government agencies, and members of the public have been involved in the process of preparing this PEIS; DOE encourages their continued participation in the site-specific decision making process

  10. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  11. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  12. Ethical considerations related to participation and partnership: an investigation of stakeholders' perceptions of an action-research project on user fee removal for the poorest in Burkina Faso.

    Science.gov (United States)

    Hunt, Matthew R; Gogognon, Patrick; Ridde, Valéry

    2014-02-20

    Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public

  13. Theater and action research

    DEFF Research Database (Denmark)

    Tofteng, Ditte Maria Børglum; Husted, Mia

    2011-01-01

    Action research on marginalization and exclusion often seeks to examine relations between recognition, respect, and inclusion, but addressing these topics is difficult. Theatre-based action research opens up a new way to communicate and make visible knowledge and experiences from below that have...... difficulties reaching the public agenda or influencing structures of power. In this article we follow the creation of a play and of scenes that address the life, sufferings, and wishes of unemployed people. The skills of actors, writers, and producers are worked into a critical utopian action research project...

  14. Use of Action Research in Nursing Education

    Directory of Open Access Journals (Sweden)

    Susan D. Moch

    2016-01-01

    Full Text Available Purpose. The purpose of this article is to describe action research in nursing education and to propose a definition of action research for providing guidelines for research proposals and criteria for assessing potential publications for nursing higher education. Methods. The first part of this project involved a search of the literature on action research in nursing higher education from 1994 to 2013. Searches were conducted in the CINAHL and MEDLINE databases. Applying the criteria identified, 80 publications were reviewed. The second part of the project involved a literature review of action research methodology from several disciplines to assist in assessing articles in this review. Results. This article summarizes the nursing higher education literature reviewed and provides processes and content related to four topic areas in nursing higher education. The descriptions assist researchers in learning more about the complexity of both the action research process and the varied outcomes. The literature review of action research in many disciplines along with the review of action research in higher education provided a framework for developing a nursing-education-centric definition of action research. Conclusions. Although guidelines for developing action research and criteria for publication are suggested, continued development of methods for synthesizing action research is recommended.

  15. Application of NEPA to nuclear weapons production, storage, and testing Weinberger v. Catholic Action of Hawaii/Peace Education Project

    International Nuclear Information System (INIS)

    Sauber, A.J.

    1984-01-01

    The National Environmental Policy Act (NEPA) requirement of environmental impact statements for the testing of military equipment, specifically nuclear weapons, conflicts with national security objectives. The author examines NEPA and the Freedom of Information Act (FOIA) in terms of the environmental effects of weapons testing and the relevant case law. The Supreme Court's decision in Catholic Action of Hawaii/Peace Education Project sought to resolve the conflict by distinguishing between a project which is contemplated and one which is proposed. The classification scheme embodied in the FOIA exemption for national security may cause unwarranted frustration of NEPA's goals. The author outlines a new classification system and review mechanism that could curb military abuse in this area

  16. The Action Researcher as Chameleon.

    Science.gov (United States)

    Hadfield, Mark; Bennett, Steve

    1995-01-01

    Describes a project that trained institutional policymakers in action research regarding problems in developing training policies about young people's needs, examining attempts to collaborate and dialog with stakeholders and discussing how project members became enmeshed in complex sets of relationships calling for construction of dialog in…

  17. An overview of actions concerning life management of nuclear power plants in Argentina

    International Nuclear Information System (INIS)

    Pochettino, A.A.

    1995-01-01

    An overview of actions concerning life management of nuclear power plants in Argentina is presented including the following issues: reorganization of nuclear activities in Argentina; life extension actions; main specific research and development actions (reactor pressure vessel integrity assessment project; reactor internal components project; heat exchanges project); other research and development actions (non-destructive testing developments; eddy current techniques; acoustic emission applications; materials; vibrations and fretting wear; reactor chemistry; control and instrumentation; probabilistic safety assessment)

  18. Action Research in Schools: The Practitioners' Perspectives

    Science.gov (United States)

    Song, Liyan; Kenton, Jeffrey M.

    2010-01-01

    This paper presents a study on the effectiveness of an action research model from the perspectives of school educators as action researchers. The study design followed seven action researchers--inservice teachers and school library media specialists--as they completed research projects in their schools. Data came from three different sources:…

  19. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    Science.gov (United States)

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  20. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  1. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  2. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  3. Students in Action Initiative

    OpenAIRE

    Ryan, Theresa; Mottiar, Ziene; Quinn, Bernadette; Gorman, Catherine; Griffin, Kevin; Craggs, Ruth; Quinn, Deirdre

    2015-01-01

    The Students in Action Project in the School of Hospitality Management and Tourism was established in 2012 as a way of engaging students and working with stakeholders in a destination. The overall aim of the project was to immerse students in an active collaborative learning environment within the destination to identify ways in which tourism could be enhanced. In the 2014/2015 academic year the project involved over 300 students from a variety of programmes and modules working with local sta...

  4. Using structuration theory in action research

    DEFF Research Database (Denmark)

    Rose, Jeremy; Lewis, Paul

    2001-01-01

    Structuration theory, Giddens' meta theory of social practice, has been used for theorizing the IS field and for analyzing empirical case studies, but has been little used in any practical or action research context. In the action research project reported here, which concerns the development...

  5. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  6. Derivation of the Polyakov action

    International Nuclear Information System (INIS)

    Kachkachi, M.

    1999-11-01

    We develop another method to get the Polyakov action that is: tile solution of tile conformal Ward identity on a Riemann surface Σ. We find that this action is the sum of two terms: the first one is expressed in terms of the projective connection and produces the diffeomorphism anomaly and tile second one is anomaly and contains the globally defined zero modes of the Ward identity. The explicit expression of this action is given on the complex plane. (author)

  7. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  8. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Goyette, M.L.; MacDonell, M.M.

    1992-01-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE's predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site

  9. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    Energy Technology Data Exchange (ETDEWEB)

    Sloop, Christina

    2017-12-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.

  10. The ultrasonic ranging and data system for radiological surveys in the UMTRA [Uranium Mill Tailings Remedial Action] Project

    International Nuclear Information System (INIS)

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs

  11. The Niagara Falls Storage Site Remedial Action Project. Status update and summary of special features

    International Nuclear Information System (INIS)

    Campbell, L.F.; Coxon, G.D.

    1986-01-01

    The U.S. Department of Energy (DOE) and its Project Management Contractor, Bechtel National, Inc., are conducting remedial action at the Niagara Falls Storage Site (NFSS) near Lewiston, New York to stabilize low-level radioactive wastes stored at the site and to decontaminate over two dozen contaminated vicinity properties. Over the past 4 years a 10-acre interim waste containment facility has been developed at the site to hold the approximately 250,000 yd/sup 3/ of contaminated soil and rubble from the cleanup operations. Several existing buildings were demolished or modified for burial inside the containment area. In addition, residues inside a 165-ft-high concrete tower were transferred to one of the buildings inside the containment area using hydraulic mining techniques. The residues were dewatered and covered with clay to minimize radom emanation; the tower was demolished and the rubble disposed of in the containment area. Environmental monitoring will continue throughout the interim storage period. In addition, the surface and subsurface condition of the containment structure will be monitored to ensure that undesirable trends are detected in time for corrective action to be taken. The DOE Record of Decision on the long-term disposition of the NFSS is expected to be made by the end of April, 1986

  12. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  13. Innovating Science Teaching by Participatory Action Research – Reflections from an Interdisciplinary Project of Curriculum Innovation on Teaching about Climate Change

    Directory of Open Access Journals (Sweden)

    Timo Feierabend

    2011-01-01

    Full Text Available This paper describes a three-year curriculum innovation project on teaching about climate change. The innovation for this study focused on a socio-critical approach towards teaching climate change in four different teaching domains (biology, chemistry, physics and politics. The teaching itself explicitly aimed at general educational objectives, i.e., fostering students’ communication and evaluation abilities as essential components for preparing young people for active participation in society. Participatory Action Research has been used as a collaborative strategy of cyclical curriculum innovation and research. Using past experiences and selected results from accompanying research, this project and its methodology will be reflected upon from the viewpoint of the chemistry group taking part in the project. Core issues reflected upon include how the project contributed to the creation of feasible curriculum materials, how it led to innovative structures in practice, and whether it supported experienced teachers’ ongoing professional development. General considerations for the process of curriculum innovation will also be derived.

  14. Action Research: Order Out of Chaos.

    Science.gov (United States)

    Geffen, Mitzi

    2002-01-01

    Describes on Israeli English-as-a-Foreign-Language teacher's action research project that focused on how to teach reading comprehension in English to a class of ninth grade boys. Outlines the teacher's goals, implementation of the project, and thoughts on the outcomes. (Author/VWL)

  15. Developing Asset Life Cycle Management capabilities through the implementation of Asset Life Cycle Plans – an Action Research project

    OpenAIRE

    Ruitenburg, Richard; Braaksma, Anne Johannes Jan

    2017-01-01

    Asset Life Cycle Management is a strategic approach to managing physical assets over their complete life cycle. However, the literature and the recent ISO 55,000 standard do not offer guidance as to how to develop such an approach. This paper investigates the main capabilities for Asset Life Cycle Management by means of a four year Action Research project implementing Asset Life Cycle Plans. Five main capabilities emerged: 1. strategic information use; 2. alignment of operations and strategy;...

  16. Managing Normative Criteria in Action Research

    DEFF Research Database (Denmark)

    Boulus-Rødje, Nina

    2014-01-01

    experiences from an action research project in a healthcare infrastructural setting. I use these experiences as a basis for appraising the normative crite- ria for rigor and relevance that are enacted in IS action research literature. I argue that while these criteria originally had important contributions......, there are also weaknesses with norma- tive approaches. Specifically, these norms of action research leave relatively little space for understanding and managing emerging empirical uncertainties. These norms are important because they have implications not only on how we conduct action research in practice...

  17. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  18. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  19. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. Th...

  20. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  1. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  2. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  3. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  4. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  5. Actions to achieve competence in radiation protection practices in the Republic of Cuba

    International Nuclear Information System (INIS)

    Prendes Alonso, M.; Tomas Zerquera, J.; Valdes Ramos, M.; Guillen Campos, A.; Santana Nunez, J.F.

    2013-01-01

    The article addresses the goals of a national project created with the purpose of systematize all actions of the country in this area, including the definition of the responsibilities of the participating institutions and the actions to ensure consistency with the guidelines of the IAEA in this field.The experiences of projects currently being developed in other countries, as it is the case of the European project ENETRAP, were taken into account in the conception of the project and its contents. The work also describes other actions that this field is developing in the country

  6. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  7. Participatory action research: involving students in parent education.

    Science.gov (United States)

    Fowler, Cathrine; Wu, Cynthia; Lam, Winsome

    2014-01-01

    Competition for scarce clinical placements has increased requiring new and innovative models to be developed to meet the growing need. A participatory action research project was used to provide a community nursing clinical experience of involvement in parent education. Nine Hong Kong nursing students self-selected to participate in the project to implement a parenting program called Parenting Young Children in a Digital World. Three project cycles were used: needs identification, skills development and program implementation. Students were fully involved in each cycle's planning, action and reflection phase. Qualitative and quantitative data were collected to inform the project. The overall outcome of the project was the provision of a rich and viable clinical placement experience that created significant learning opportunities for the students and researchers. This paper will explore the student's participation in this PAR project as an innovative clinical practice opportunity. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. Is credit for early action credible early action?

    International Nuclear Information System (INIS)

    Rolfe, C.; Michaelowa, A.; Dutschke, M.

    1999-12-01

    Credit for early action as a tool for greenhouse gas emissions reduction is compared with various market instruments as a means of narrowing the gap between projected emissions and those of the Kyoto Protocol. Market instruments work by creating a market price for emissions and use the market to encourage reductions at the lowest price, which is done by placing limits on greenhouse gas emissions and allowing the market to decide where reductions occur, or by imposing a carbon tax or emissions charge. While they can be applied within a sector, they are usually used to encourage reductions throughout the economy or across large sectors. Credit for early action also creates an incentive for emissions reductions throughout the economy or at least across many sectors. Credit for early action tools do not work by either imposing a carbon tax or emissions charge or placing limits on emissions, rather they promise that entities that take action against greenhouse gases prior to the imposition of a carbon tax or emissions limits will receive a credit against future taxes or limits. An overview is provided of the Kyoto Protocol and the rationale for taking early action, and a review is included of the theory and specific proposals for market instruments and credit for early action. A comparative analysis is provided of these approaches by examining their relative efficiency, environmental effectiveness, and impacts on the redistribution of wealth. Credit for early action is viewed as problematic on a number of counts and is seen as an interim strategy for imposition while political support for market instruments develop. The environmental effectiveness of credit for early action is very difficult to predict, and credit for early action programs do not yield the lowest cost emissions reductions. Credit for early action programs will not achieve compliance with the Kyoto Protocol at the lowest cost, and credits for early action will increase the compliance costs for those who

  9. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  10. Remedial Action Program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    Within the DOE's Office of Environmental Restoration ampersand Waste Management, the Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. The programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings Remedial Action Program, and the West Valley Demonstration Project. These programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive or hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Uranium Mill Tailings Remedial Action Project, DOE-AL, and was held in Albuquerque, NM. This volume of proceedings is the record of that conference. The proceedings consist of abstracts, summaries, or actual text for each presentation made and any visual aids used by the speakers

  11. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  12. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  13. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  14. Department of Energy Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    Franco, P.J.

    1989-01-01

    This paper discusses the hazardous waste remedial actions program (HAZWRAP) which manages approximately 200 hazardous waste projects. These projects include preliminary assessments, site inspections, and remedial investigation/feasibility studies. The author describes the procedures HAZWRAP follows to ensure quality. The discussion covers the quality assurance aspects of project management, project planning, site characterization, document control and technical teamwork

  15. ENGAGING YOUTH THROUGH SPATIAL SOCIO-TECHNICAL STORYTELLING, PARTICIPATORY GIS, AGENT-BASED MODELING, ONLINE GEOGAMES AND ACTION PROJECTS

    Directory of Open Access Journals (Sweden)

    A. Poplin

    2017-09-01

    Full Text Available The main goal of this paper is to present the conceptual framework for engaging youth in urban planning activities that simultaneously create locally meaningful positive change. The framework for engaging youth interlinks the use of IT tools such as geographic information systems (GIS, agent-based modelling (ABM, online serious games, and mobile participatory geographic information systems with map-based storytelling and action projects. We summarize the elements of our framework and the first results gained in the program Community Growers established in a neighbourhood community of Des Moines, the capital of Iowa, USA. We conclude the paper with a discussion and future research directions.

  16. Engaging Youth Through Spatial Socio-Technical Storytelling, Participatory GIS, Agent-Based Modeling, Online Geogames and Action Projects

    Science.gov (United States)

    Poplin, A.; Shenk, L.; Krejci, C.; Passe, U.

    2017-09-01

    The main goal of this paper is to present the conceptual framework for engaging youth in urban planning activities that simultaneously create locally meaningful positive change. The framework for engaging youth interlinks the use of IT tools such as geographic information systems (GIS), agent-based modelling (ABM), online serious games, and mobile participatory geographic information systems with map-based storytelling and action projects. We summarize the elements of our framework and the first results gained in the program Community Growers established in a neighbourhood community of Des Moines, the capital of Iowa, USA. We conclude the paper with a discussion and future research directions.

  17. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  18. Challenges of scaling up and of knowledge transfer in an action research project in Burkina Faso to exempt the worst-off from health care user fees

    Directory of Open Access Journals (Sweden)

    Kadio Kadidiatou

    2011-11-01

    Full Text Available Abstract Background Systems to exempt the indigent from user fees have been put in place to prevent the worst-off from being excluded from health care services for lack of funds. Yet the implementation of these mechanisms is as rare as the operational research on this topic. This article analyzes an action research project aimed at finding an appropriate solution to make health care accessible to the indigent in a rural district of Burkina Faso. Research This action research project was initiated in 2007 to study the feasibility and effectiveness of a community-based, participative and financially sustainable process for exempting the indigent from user fees. A interdisciplinary team of researchers from Burkina Faso and Canada was mobilized to document this action research project. Results and knowledge sharing The action process was very well received. Indigent selection was effective and strengthened local solidarity, but coverage was reduced by the lack of local financial resources. Furthermore, the indigent have many other needs that cannot be addressed by exemption from user fees. Several knowledge transfer strategies were implemented to share research findings with residents and with local and national decision-makers. Partnership achievements and difficulties Using a mixed and interdisciplinary research approach was critical to grasping the complexity of this community-based process. The adoption of the process and the partnership with local decision-makers were very effective. Therefore, at the instigation of an NGO, four other districts in Burkina Faso and Niger reproduced this experiment. However, national decision-makers showed no interest in this action and still seem unconcerned about finding solutions that promote access to health care for the indigent. Lessons learned The lessons learned with regard to knowledge transfer and partnerships between researchers and associated decision-makers are: i involve potential users of the

  19. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  20. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  1. Using action research for complex research initiatives

    CSIR Research Space (South Africa)

    Greeff, M

    2009-12-01

    Full Text Available the research process of such a complex research initiative. Action research is one research method that lends itself to these complex projects. The paper uses the Ability Based Technology Interventions (AbTi) research project as a case study to analyse...

  2. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  3. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  4. Through a Feminist Poststructuralist Lens: Embodied Subjectivites and Participatory Action Research

    Science.gov (United States)

    Chesnay, Catherine T.

    2016-01-01

    An emerging literature has been building bridges between poststructuralism and participatory action research, highlighting the latter's potential for transformative action. Using examples from participative action research projects with incarcerated or previously incarcerated women, this article discusses how participatory action research is a…

  5. Building Civic Bridges: Community-Centered Action Civics

    Science.gov (United States)

    LeCompte, Karon; Blevins, Brooke

    2015-01-01

    Project-based learning is an example of powerful social studies learning in which student engage in active inquiry. Action civics is a relatively new educational practice in which students "act as citizens" through a cycle of research, action, and reflection about problems they care about in their community. "Building Civic…

  6. By a communicative action/supervison: Haberma's strategy to rethink the educational practices in the Project of Professiobalization of Workers in the Field Nursing.

    Directory of Open Access Journals (Sweden)

    Elioenai Dornelles Alves

    2012-01-01

    Full Text Available This philosophical reflection search to build some guide elements that can subsidize the discussions on the teaching methodologies in health and nursing, while philosophical referencial to rethink the pedagogic political projects used in the qualification of human resources in health and of the implications with the offers of courses, projects, researches and activities related to extension action the permanent education in health. This study search to rescue a critical and creative approach of the educators in health, contributing to a new look interdisciplinar focused philosophically of way multiprofissional, to rethink our praxis in the different acting forms.

  7. Projective simulation for artificial intelligence

    Science.gov (United States)

    Briegel, Hans J.; de Las Cuevas, Gemma

    2012-05-01

    We propose a model of a learning agent whose interaction with the environment is governed by a simulation-based projection, which allows the agent to project itself into future situations before it takes real action. Projective simulation is based on a random walk through a network of clips, which are elementary patches of episodic memory. The network of clips changes dynamically, both due to new perceptual input and due to certain compositional principles of the simulation process. During simulation, the clips are screened for specific features which trigger factual action of the agent. The scheme is different from other, computational, notions of simulation, and it provides a new element in an embodied cognitive science approach to intelligent action and learning. Our model provides a natural route for generalization to quantum-mechanical operation and connects the fields of reinforcement learning and quantum computation.

  8. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  9. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  10. Action research in inter-organisational networks : - impartial studies or the Trojan horse?

    DEFF Research Database (Denmark)

    Goduscheit, René Chester; Rasmussen, Erik Stavnsager; Jørgensen, Jacob Høj

    2007-01-01

    Traditionally, the literature on action research has been aimed at intra-organisational issues. These studies have distinguished between two researcher roles: The problem-solver and the observer. This article addresses the distinct challenges of action research in inter-organisational projects....... In addition to the problem-solver and observer roles, the researcher in an inter-organisational setting can serve as a legitimiser of the project and manage to involve partners that in an ordinary business-to-business setting would not have participated. Based on an action research project in a Danish inter......-organisational network, this article discusses potential pitfalls in the legitimiser role. Lack of clarity in defining the researcher role and project ownership in relation to the funding organisation and the rest of the network can jeopardise the project and potentially the credibility of the researchers. The article...

  11. Resonating Statements: Discursive acts in IT projects

    DEFF Research Database (Denmark)

    Hjelholt, Morten; Jensen, Tina Blegind

    2015-01-01

    IT projects are often complex arrangements of technological components, social actions, and organizational transformation that are difficult to manage in practice. This paper takes an analytical discourse perspective to explore the process of legitimizing IT projects. We introduce the concept...... of resonating statements to highlight how central actors navigate in various discourses over time. Particularly, the statements and actions of an IT project manager are portrayed to show how individuals can legitimize actions by connecting statements to historically produced discourses. The case study...... of an IT project in a Danish local government spans a two-year time period and demonstrates a double-loop legitimization process. First, resonating statements are produced to localize a national IT initiative to support the specificity of a local government discourse. Second, the resonating statements are used...

  12. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  13. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  14. Civil Society, Adult Learning and Action in India.

    Science.gov (United States)

    Tandon, Rajesh

    2000-01-01

    Five case studies of individual and collective learning projects in India demonstrate that (1) the impetus for civic action arises from local conditions; (2) transformative action requires sustained adult learning; and (3) civil society is a complex concept reflecting diverse priorities and perspectives. (SK)

  15. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  16. Health Activities Project (HAP): Action/Reaction Module.

    Science.gov (United States)

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within this module are teacher and student folios describing activities in timing, improving, and practicing to improve reaction…

  17. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  18. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  19. 18 CFR 4.105 - Action on exemption applications.

    Science.gov (United States)

    2010-04-01

    ... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Action on exemption...

  20. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  1. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  2. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  3. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  4. Reve et action: Bloch, Heidegger et Levinas

    Czech Academy of Sciences Publication Activity Database

    Bierhanzl, Jan

    2016-01-01

    Roč. 12, č. 3 (2016), s. 1-6 ISSN 1336-6556 R&D Projects: GA ČR(CZ) GA16-23046S Institutional support: RVO:67985955 Keywords : possibility * wishing * decision * action * dream * utopia Subject RIV: AA - Philosophy ; Religion http://www.ostium.sk/sk/r%C8%87ve-er-action-bloch-heidegger-et-levinas/

  5. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  6. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  7. Building a Knowledge to Action Program in Stroke Rehabilitation.

    Science.gov (United States)

    Janzen, Shannon; McIntyre, Amanda; Richardson, Marina; Britt, Eileen; Teasell, Robert

    2016-09-01

    The knowledge to action (KTA) process proposed by Graham et al (2006) is a framework to facilitate the development and application of research evidence into clinical practice. The KTA process consists of the knowledge creation cycle and the action cycle. The Evidence Based Review of Stroke Rehabilitation is a foundational part of the knowledge creation cycle and has helped guide the development of best practice recommendations in stroke. The Rehabilitation Knowledge to Action Project is an audit-feedback process for the clinical implementation of best practice guidelines, which follows the action cycle. The objective of this review was to: (1) contextualize the Evidence Based Review of Stroke Rehabilitation and Rehabilitation Knowledge to Action Project within the KTA model and (2) show how this process led to improved evidence-based practice in stroke rehabilitation. Through this process, a single centre was able to change clinical practice and promote a culture that supports the use of evidence-based practices in stroke rehabilitation.

  8. "I'm Not so Sure…": Teacher Educator Action Research into Uncertainty

    Science.gov (United States)

    Rogers, Carrie

    2016-01-01

    Using a framework of uncertainty that is informed by Hannah Arendt's philosophy this four-semester action research project describes the creation and analysis of an assignment that allows teacher candidates to explore their own uncertainties in regards to the teaching profession. This action research project examines the assignment and its…

  9. Action Research in the University Library: the “Front Office Project”

    OpenAIRE

    Moroni, Ilaria

    2011-01-01

    The presentation of the University Library "Front Office Project ", briefly explains the Action Research method (history, applications, features, and process), then reports five phases of the action research project about library services: 1) Diagnosis by benchmarking among Italian university library services, literature analysis about library services and surveys, quantitative survey (questionnaires) and qualitative survey (interviews) addressed to users (students, teachers, etc.); 2) Planni...

  10. UMTRA Ground Water Project management action process document

    International Nuclear Information System (INIS)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards

  11. Metaphors in Projects - An Overlooked X-factor

    DEFF Research Database (Denmark)

    Svejvig, Per

    2015-01-01

    Metaphors are pervasive in human thought and action, but have been an overlooked X-factor in projects and project management. This essay presents deliberate uses of metaphors classified into specific projects and frameworks for projects in order to stimulate explicit uses of metaphors in project...

  12. 75 FR 19670 - Marine Highway Projects

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway Projects as specified in the America's Marine Highway Program Final Rule, MARAD...

  13. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  14. Essential actions for caterers to promote healthy eating out among European consumers: results from a participatory stakeholder analysis in the HECTOR project.

    Science.gov (United States)

    Lachat, Carl; Naska, Androniki; Trichopoulou, Antonia; Engeset, Dagrun; Fairgrieve, Alastair; Marques, Helena Ávila; Kolsteren, Patrick

    2011-02-01

    To identify and assess actions by which the catering sector could be engaged in strategies for healthier eating out in Europe. A SWOT analysis was used to assess the participation of the catering sector in actions for healthier eating out. Caterers subsequently shortlisted essential actions to overcome threats and weaknesses the sector may face when engaging in implementing these actions. Analysis undertaken in the European Union-supported HECTOR project on 'Eating Out: Habits, Determinants and Recommendations for Consumers and the European Catering Sector'. Thirty-eight participants from sixteen European countries reflecting a broad multi-stakeholder panel on eating out in Europe. The catering sector possesses strengths that allow direct involvement in health promotion strategies and could well capitalise on the opportunities offered. A focus on healthy eating may necessitate business re-orientations. The sector was perceived as being relatively weak in terms of its dependency on the supply of ingredients and lack of financial means, technical capacity, know-how and human resources. To foster participation in strategies for healthier eating out, caterers noted that guidelines should be simple, food-based and tailored to local culture. The focus could be on seasonal foods, traditional options and alternative dishes rather than just on 'healthy eating'. Small-to-medium-sized enterprises have specific concerns and needs that should be considered in the implementation of such strategies. The study highlights a number of possible policy actions that could be instrumental in improving dietary intake in Europe through healthier eating out.

  15. RE_ACTION

    DEFF Research Database (Denmark)

    This book investigates the ways in which new digital media may enhance the experience of the art-archive. Taken as a whole, the new media is a vital component of a 'transdisciplinary' and transformative field, a cultural landscape that is changing rapidly the conditions and domains of the archive...... of the project was presented at the exhibition TOTAL_ACTION - Art in the New Media Landscape at the Museum of Contemporary Art in Roskilde, Denmark, from October through November 2008....

  16. Using Nikola Tesla's Story and His Experiments as Presented in the Film "The Prestige" to Promote Scientific Inquiry: A Report of an Action Research Project

    Science.gov (United States)

    Hadzigeorgiou, Yannis; Garganourakis, Vassilios

    2010-01-01

    This paper reports on an action research project undertaken with the primary aim of investigating the extent to which situations that evoke a sense of wonder can promote scientific inquiry. Given the intense interest, curiosity, and wonder that some students had begun to develop after seeing the film "The Prestige", a science teacher…

  17. 76 FR 69700 - Klamath National Forest; California; Pumice Vegetation Management Project

    Science.gov (United States)

    2011-11-09

    ... Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact.... Grantham, Forest Supervisor, Attn: Ben Haupt, Pumice Vegetation Management Project Team Leader, Goosenest... Management Project will recommend implementation of one of the following: (1) The proposed action; (2) an...

  18. [Method for projecting indicators for the goals of the Strategic Action Plan for Tackling Chronic Non-Communicable Diseases in Brazil according to Capitals and the Federal District].

    Science.gov (United States)

    Bernal, Regina Tomie Ivata; Malta, Deborah Carvalho; Iser, Betine Pinto Moehlecke; Monteiro, Rosane Aparecida

    2016-01-01

    to present the indicators' projection method of the Strategic Action Plan for Tackling Chronic Non-Communicable Diseases (NCDs) in Brazilian State capitals and the Federal District, 2012-2022. simple linear regression model was used to calculate the indicators' projections with data from the Surveillance System of Risk and Protective Factors for Chronic Diseases by Telephone Survey (Vigitel). in most of the capitals, there was an increase in the prevalence of obesity (annual change: 0.36%;1.29%), overweight (annual change: 1.11%;2.00%), recommended (annual change: 1.45%;2.66%) and regular (annual change: 0.45%;1.46%) consumption of fruits and vegetables; smoking presented a decreasing trend (annual change: -1.34%;-0.20%); whereas physical inactivity, heavy drinking and mammography and Pap smears examinations were stable. most of the goals are possible; however, effective actions are necessary, especially for tackling overweight and heavy drinking.

  19. Power and contexts – some societal conditions for participatory projects

    DEFF Research Database (Denmark)

    Bloch-Poulsen, Jørgen; Kristiansen, Marianne

    2014-01-01

    Based on action research co-operation with a team of teachers at a Social and Healthcare College in Denmark 2012-2013, the article raises the question: What are the conditions for organisational action research projects in a neoliberal context? The article has three purposes. Firstly, we want...... to show that mapping and delimitating relevant contexts are critical in an organisational AR project, because it is always arbitrary what you delimit as your field of inquiry, initially. The consequences of ignoring this in the project described were fatal. Secondly, the article draws attention to clashes...... with immediate and additional stakeholders questioning, among others, if the action research project is practicable at all....

  20. 78 FR 33755 - Project Financing Loans

    Science.gov (United States)

    2013-06-05

    ... CFR Part 1710 [0572-AC21] Project Financing Loans AGENCY: Rural Utilities Service, USDA. ACTION... also considering regulations to clarify the agency's procedures for single asset/project financing... parameters necessary to more effectively and prudently use project financing in the RUS electric loan program...

  1. Games, Actions and Social Software

    NARCIS (Netherlands)

    D.J.N. van Eijck (Jan); R. Verbrugge; not CWI et al

    2012-01-01

    textabstractThis is the second book that appears as a product of the multi-disciplinary project ``Games, Action and Social Software'', which was carried out at the Netherlands Institute for Advanced Study in the Humanities and Social Sciences (NIAS) in Wassenaar, from September 2006 through

  2. Probabilistic measures of climate change vulnerability, adaptation action benefits, and related uncertainty from maximum temperature metric selection

    Science.gov (United States)

    DeWeber, Jefferson T.; Wagner, Tyler

    2018-01-01

    Predictions of the projected changes in species distributions and potential adaptation action benefits can help guide conservation actions. There is substantial uncertainty in projecting species distributions into an unknown future, however, which can undermine confidence in predictions or misdirect conservation actions if not properly considered. Recent studies have shown that the selection of alternative climate metrics describing very different climatic aspects (e.g., mean air temperature vs. mean precipitation) can be a substantial source of projection uncertainty. It is unclear, however, how much projection uncertainty might stem from selecting among highly correlated, ecologically similar climate metrics (e.g., maximum temperature in July, maximum 30‐day temperature) describing the same climatic aspect (e.g., maximum temperatures) known to limit a species’ distribution. It is also unclear how projection uncertainty might propagate into predictions of the potential benefits of adaptation actions that might lessen climate change effects. We provide probabilistic measures of climate change vulnerability, adaptation action benefits, and related uncertainty stemming from the selection of four maximum temperature metrics for brook trout (Salvelinus fontinalis), a cold‐water salmonid of conservation concern in the eastern United States. Projected losses in suitable stream length varied by as much as 20% among alternative maximum temperature metrics for mid‐century climate projections, which was similar to variation among three climate models. Similarly, the regional average predicted increase in brook trout occurrence probability under an adaptation action scenario of full riparian forest restoration varied by as much as .2 among metrics. Our use of Bayesian inference provides probabilistic measures of vulnerability and adaptation action benefits for individual stream reaches that properly address statistical uncertainty and can help guide conservation

  3. Probabilistic measures of climate change vulnerability, adaptation action benefits, and related uncertainty from maximum temperature metric selection.

    Science.gov (United States)

    DeWeber, Jefferson T; Wagner, Tyler

    2018-06-01

    Predictions of the projected changes in species distributions and potential adaptation action benefits can help guide conservation actions. There is substantial uncertainty in projecting species distributions into an unknown future, however, which can undermine confidence in predictions or misdirect conservation actions if not properly considered. Recent studies have shown that the selection of alternative climate metrics describing very different climatic aspects (e.g., mean air temperature vs. mean precipitation) can be a substantial source of projection uncertainty. It is unclear, however, how much projection uncertainty might stem from selecting among highly correlated, ecologically similar climate metrics (e.g., maximum temperature in July, maximum 30-day temperature) describing the same climatic aspect (e.g., maximum temperatures) known to limit a species' distribution. It is also unclear how projection uncertainty might propagate into predictions of the potential benefits of adaptation actions that might lessen climate change effects. We provide probabilistic measures of climate change vulnerability, adaptation action benefits, and related uncertainty stemming from the selection of four maximum temperature metrics for brook trout (Salvelinus fontinalis), a cold-water salmonid of conservation concern in the eastern United States. Projected losses in suitable stream length varied by as much as 20% among alternative maximum temperature metrics for mid-century climate projections, which was similar to variation among three climate models. Similarly, the regional average predicted increase in brook trout occurrence probability under an adaptation action scenario of full riparian forest restoration varied by as much as .2 among metrics. Our use of Bayesian inference provides probabilistic measures of vulnerability and adaptation action benefits for individual stream reaches that properly address statistical uncertainty and can help guide conservation actions. Our

  4. Business Action Learning Tasmania (BALT)--An Account of Practice

    Science.gov (United States)

    Cother, Genevieve; Cother, Robert F.

    2017-01-01

    Business Action Learning Tasmania's (BALT) mission is self-reliant industry development, with diverse companies co-operating to improve their profitability, develop their people and grow the local economy. This is achieved through collaborative action learning, with companies working together on projects of vital importance and sharing the…

  5. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  6. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  7. Action research in rehabilitation with chronic stroke recovery

    DEFF Research Database (Denmark)

    Pedersen, Malene; Bundgaard, Tina H; Zeeman, Peter

    2016-01-01

    BACKGROUND: Chronic stroke patients are primarily referred to general rehabilitation, rather than to specific neurorehabilitation. Currently, there are no Danish clinical guidelines for chronic stroke, but recent research in neuroplasticity has contributed to possible rehabilitation interventions....... CONCLUSIONS: This report indicates that a specific neuroplastic focus in combination with action research has an impact on the participants with chronic stroke. However, there is still no clarity regarding what type of rehabilitation methods can be considered the most efficacious in promoting neuroplasticity...... for these patients. OBJECTIVE: The purpose of this project is to describe the use of a specialized neuroplastic approach in combination with an already existing training program. METHODS: The project is designed as an action research project concerning four participants with chronic stroke. Through ten intervention...

  8. The Autonomy-Authority Duality of Shared Decision-Making in Youth Environmental Action

    Science.gov (United States)

    Schusler, Tania M.; Krasny, Marianne E.; Decker, Daniel J.

    2017-01-01

    While environmental action is recognized as an effective approach for developing young people's capabilities as citizens and contributing to environmental improvements, little research has addressed how adults facilitate youth action projects. Environmental action involves a partnership among youth and adults characterized by shared…

  9. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  10. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  11. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  12. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  13. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  14. Action learning in undergraduate engineering thesis supervision

    Directory of Open Access Journals (Sweden)

    Brad Stappenbelt

    2017-03-01

    Full Text Available In the present action learning implementation, twelve action learning sets were conducted over eight years. The action learning sets consisted of students involved in undergraduate engineering research thesis work. The concurrent study accompanying this initiative, investigated the influence of the action learning environment on student approaches to learning and any accompanying academic, learning and personal benefits realised. The influence of preferred learning styles on set function and student adoption of the action learning process were also examined. The action learning environment implemented had a measurable significant positive effect on student academic performance, their ability to cope with the stresses associated with conducting a research thesis, the depth of learning, the development of autonomous learners and student perception of the research thesis experience. The present study acts as an addendum to a smaller scale implementation of this action learning approach, applied to supervision of third and fourth year research projects and theses, published in 2010.

  15. Project-Based Community Participatory Action Research Using Geographic Information Technologies

    Science.gov (United States)

    Kim, Minsung

    2018-01-01

    The paper investigates the effects of a project-based community participation course in which students chose research topics relevant to a local community. Specifically, the students undertook the following projects: (1) creating a virtual 3D model of a local government office, (2) creating interactive digitized versions of mountain trails using…

  16. Project Compliance with Enterprise Architecture

    NARCIS (Netherlands)

    Foorthuis, R.M.

    2012-01-01

    This research project set out to identify effective practices and models for working with projects that are required to comply with Enterprise Architecture (EA), and investigate the benefits and drawbacks brought about by compliance. Research methods used are canonical action research, a statistical

  17. Interdisciplinary linkage of community psychology and cross-cultural psychology: history, values, and an illustrative research and action project on intimate partner violence.

    Science.gov (United States)

    Mankowski, Eric S; Galvez, Gino; Glass, Nancy

    2011-03-01

    An analysis of the respective organizational histories, missions, and scholarly activity of the International Association for Cross-Cultural Psychology and the Society for Community Research and Action was conducted in order to inform the development of interdisciplinary linkages between members of the two organizations. The analysis revealed many points of shared values and actions, as well as some important differences. Both scholarly organizations developed out of a similar historical and cultural zeitgeist in the late 1960s and early 1970s. The missions emphasize the role of culture/diversity in psychological phenomena, adopting an interdisciplinary orientation, the value of collaboration, the importance of research method and ethics, and the value of action research. However, community psychology generally lacks an adequate treatment of cultural phenomena while cross-cultural psychology often fails to draw on community and participatory methods useful for understanding culture in context. These common roots and differences are examined. Finally, we describe a community based, participatory research and intervention project to address intimate partner violence among Latinos and European-Americans living in Oregon. Analysis of the research process and on some of our initial findings illustrates challenges and potential benefits of an interdisciplinary, cultural community psychology.

  18. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  19. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  20. 76 FR 6153 - Supplemental Environmental Impact Statement for the Proposed Campo Regional Landfill Project on...

    Science.gov (United States)

    2011-02-03

    ... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...

  1. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  2. Improving a health information system for real-time data entries: An action research project using socio-technical systems theory.

    Science.gov (United States)

    Adaba, Godfried Bakiyem; Kebebew, Yohannes

    2018-03-01

    This paper presents the findings of an action research (AR) project to improve a health information system (HIS) at the Operating Theater Department (OTD) of a National Health Service (NHS) hospital in South East England, the UK. Informed by socio-technical systems (STS) theory, AR was used to design an intervention to enhance an existing patient administration system (PAS) to enable data entries in real time while contributing to the literature. The study analyzed qualitative data collected through interviews, participant observations, and document reviews. The study found that the design of the PAS was unsuitable to the work of the three units of the OTD. Based on the diagnoses and STS theory, the project developed and implemented a successful intervention to enhance the legacy system for data entries in real time. The study demonstrates the value of AR from a socio-technical perspective for improving existing systems in healthcare settings. The steps adopted in this study could be applied to improve similar systems. A follow-up study will be essential to assess the sustainability of the improved system.

  3. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  4. Action Research and Interactive Research

    DEFF Research Database (Denmark)

    First part of the book is written by senior researchers on specific issues like validity, gender, new forms of organisations, methodologies and methods, earlier and new trends. - The second part of the book is written by doctoral students reporting experiences doing action research in their PhD-projects....

  5. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  6. Twisted equivariant K-theory, groupoids and proper actions

    OpenAIRE

    Cantarero, Jose

    2009-01-01

    In this paper we define twisted equivariant K-theory for actions of Lie groupoids. For a Bredon-compatible Lie groupoid, this defines a periodic cohomology theory on the category of finite CW-complexes with equivariant stable projective bundles. A classification of these bundles is shown. We also obtain a completion theorem and apply these results to proper actions of groups.

  7. Making Tracks 1.0: Action Researching an Active Transportation Education Program

    Science.gov (United States)

    Robinson, Daniel; Foran, Andrew; Robinson, Ingrid

    2014-01-01

    This paper reports on the results of the first cycle of an action research project. The objective of this action research was to examine the implementation of a school-based active transportation education program (Making Tracks). A two-cycle action research design was employed in which elementary school students' (ages 7-9), middle school…

  8. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  9. Energy efficiency action plan. Policy action plan for promotion of energy efficiency in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply and environmental protection. Therefore, the Czech government aims to promote these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. In addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formulation of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Energy Efficiency Action Plan focuses on promotion of energy efficiency in end-use (this report); The Renewable Energy Action Plan (separate report; ECN-C--99-064) deals with policy on promotion of renewable energy production. These two Action Plans provide policy makers in the Czech government with essential information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; and (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the investment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  10. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  11. Student Voice in High School: An Action Research Study

    Science.gov (United States)

    Termini, Lorraine

    2013-01-01

    This action research study examined the effects of student voice in one high school and the self-reflection of the researcher-administrator involved in the effort. Using three cycles of action research, the researcher-administrator completed a pilot study, implemented a student voice project in one class, and developed a professional development…

  12. Three imperative action formats in Danish talk-in-interaction

    DEFF Research Database (Denmark)

    Steensig, Jakob; Heinemann, Trine

    2017-01-01

    be translated into ‘just’ in English, but they are not synonymous in Danish. The investigated actions formats are: (1) imperative+lige, which is used to perform a bilateral request, that is a request for an action that is portrayed as being part of a common project, (2) imperative+bare, which is used to grant...... permission, and (3) bare+imperative, which is used to advise the recipient to carry out a specific action as a solution to a problem. The action formats are designed to show consideration of the recipients’ benefits of the proposed actions in specific ways and they make differential claims of entitlement...

  13. Mid-term evaluation of the Climate Change Action Fund: Technology Early Action Measures (TEAM) block

    International Nuclear Information System (INIS)

    2001-11-01

    To assist Canada in meeting its commitments under the Kyoto Protocol for the reduction of greenhouse gas emissions, the Government of Canada established the Climate Change Action Fund (CCAF) in 1998. Under the CCAF umbrella, the Technology Early Action Measures (TEAM) Block was initially allocated 60 million dollars over a three-year period for the provision of cost-shared support to speed up the development and deployment of cost-effective near market-ready greenhouse gases emission reducing technologies. The main avenues adopted by TEAM in its mandate were: supporting technology development and deployment, overcoming obstacles to technology development and deployment, and piloting technology transfer to developing countries and countries in transition. A mid-term evaluation of its performance to date was conducted. It proved to be too early for an adequate assessment of the extent to which the projects sponsored by TEAM demonstrated technical success in reducing greenhouse gases emissions, considering the time-consuming tasks required for the development and negotiation of technology projects. Most projects to date have not moved beyond the early stages benchmark. It was determined that the expected outcomes will be achieved. The innovative approach selected by TEAM, building on existing programs, appeared to be very effective. Findings and recommendations were discussed in this report

  14. Using Action Research Projects to Examine Teacher Technology Integration Practices

    Science.gov (United States)

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  15. Action Learning--A Process Which Supports Organisational Change Initiatives

    Science.gov (United States)

    Joyce, Pauline

    2012-01-01

    This paper reflects on how action learning sets (ALSs) were used to support organisational change initiatives. It sets the scene with contextualising the inclusion of change projects in a masters programme. Action learning is understood to be a dynamic process where a team meets regularly to help individual members address issues through a highly…

  16. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  17. 76 FR 47288 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Science.gov (United States)

    2011-08-04

    ... highway project will be barred unless the claim is filed on or before January 31, 2012. If the Federal law... following highway project in the State of California: The addition of bus rapid transit stations and... actions by the Federal agencies, and the laws under which such actions were taken, are described in the...

  18. "Knowing Is Not Enough; We Must Apply": Reflections on a Failed Action Learning Application

    Science.gov (United States)

    Reese, Simon

    2015-01-01

    This paper reflects upon a sub-optimal action learning application with a strategic business re-design project. The objective of the project was to improve the long-term business performance of a subsidiary business and build the strategic plan. Action learning was introduced to aid the group in expanding their view of the real problems…

  19. Climate Ready Estuaries Partner Projects Map

    Science.gov (United States)

    CRE partners with the National Estuary Program to develop climate change projects in coastal U.S. areas, such as bays and harbors; to develop adaptation action plans, identify climate impacts and indicators, and more. This map shows project locations.

  20. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  1. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  2. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  3. Action research and empowerment in a Danish context – experiences from three different contexts

    DEFF Research Database (Denmark)

    Andersen, John; Søgård jensen, Michael; Bilfeldt, Anette

    The paper discusses how action research with active participation from a.o. citizens, public employees, private employees and environmental organizations, can contribute to strengthen these actors’ capacity to get influence on the development of society and to contribute to societal change...... for better social and environmental conditions. The paper introduces the core concepts in action research and the linkage between critical participatory action research and empowerment. The paper presents three different action research projects that has been carried out in: 1) a public nursing home, where...... in methods that have been employed in the three projects. Finally challenges and opportunities for action research to contribute to empowerment and to the development of societal change with better social and environmental conditions are discussed....

  4. Community based needs assessment in an urban area; A participatory action research project

    Directory of Open Access Journals (Sweden)

    Ahari Saeid

    2012-03-01

    Full Text Available Abstract Background Community assessment is a core function of public health. In such assessments, a commitment to community participation and empowerment is at the heart of the WHO European Healthy Cities Network, reflecting its origins in health for all and the Ottawa Charter for Health Promotion. This study employs a participation and empowerment plan in order to conduct community assessment. Methods The method of participatory action research (PAR was used. The study was carried out in an area of high socio-economic deprivation in Ardabil, a city in the northwest of Iran, which is currently served by a branch of the Social Development Center (SDC. The steering committee of the project was formed by some university faculty members, health officials and delegates form Farhikhteh non-governmental organization and representatives from twelve blocks or districts of the community. Then, the representatives were trained and then conducted focus groups in their block. The focus group findings informed the development of the questionnaire. About six hundred households were surveyed and study questionnaires were completed either during face-to-face interviews by the research team (in case of illiteracy or via self-completion. The primary question for the residents was: 'what is the most important health problem in your community? Each health problem identified by the community was weighted based on the frequency it was selected on the survey, and steering committee perception of the problem's seriousness, urgency, solvability, and financial load. Results The main problems of the area appeared to be the asphalt problem, lack of easy access to medical centers, addiction among relatives and unemployment of youth. High participation rates of community members in the steering committee and survey suggest that the PAR approach was greatly appreciated by the community and that problems identified through this research truly reflect community opinion

  5. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Volume 2 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This appendix discusses the scope of actions addressed in the Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. To address the purpose and need for agency action identified in Chapter 2.0 of the HRA-EIS, the scope includes an evaluation of the potential environmental impacts associated with the remedial actions to be conducted by the US Department of Energy (DOE) under the provisions of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1989). These remedial actions would bring the Hanford Site into compliance with the applicable requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA). The DOE program responsible for conducting remedial actions at the Hanford Site is referred to as the Richland Environmental Restoration (ER) Project. The Richland ER Project encompasses the following projects: radiation area remedial actions and underground storage tanks (UST); RCRA closures; single-shell tank (SST) closures; past-practice waste site operable unit (source and groundwater) remedial actions; surplus facility decommissioning; and waste storage and disposal facilities

  6. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  7. 76 FR 1664 - Notice of Final Federal Agency Actions on State Highway 99 (Segment G)

    Science.gov (United States)

    2011-01-11

    ... on State Highway 99 (Segment G) AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of.... 139(l)(1). The actions relate to a proposed highway project, Grand Parkway (State Highway 99) Segment... (State Highway 99) Segment G from I- 45 to US 59 in Harris and Montgomery Counties; FHWA Project...

  8. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    International Nuclear Information System (INIS)

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers ''will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of ''vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells

  9. An Action Research Study of a Healthcare Enterprise information System at the Faroe Islands

    DEFF Research Database (Denmark)

    Schlichter, Bjarne Rerup; Svejvig, Per; Andersen, Povl Erik Rostgaard

    2015-01-01

    concerning getting value from their IT investment. In order to fulfill this objective an action research project was started in the fall of 2010 consisting of two cycles: (1) setting the stage for benefit realization and; (2) benefit realization in a pilot area. The first cycle has revealed...... of Style Composition in action research we suggest a method to identify and realize emergent IT public value in an HIS action research project. The method is presented and discussed, and issues and concerns for further research are presented....

  10. Methods for assessing environmental impacts of a FUSRAP property-cleanup/interim-storage remedial action

    International Nuclear Information System (INIS)

    Wyman, D.J.

    1982-12-01

    This document provides a description of a property-cleanup/interim-storage action, explanation of how environmental impacts might occur, comprehensive treatment of most potential impacts that might occur as a result of this type of action, discussion of existing methodologies for estimating and assessing impacts, justification of the choice of specific methodologies for use in FUSRAP environmental reviews, assessments of representative impacts (or expected ranges of impacts where possible), suggested mitigation measures, and some key sources of information. The major topical areas covered are physical and biological impacts, radiological impacts, and socioeconomic impacts. Some project-related issues were beyond the scope of this document, including dollar costs, specific accident scenarios, project funding and changes in Congressional mandates, and project management (contracts, labor relations, quality assurance, liability, emergency preparedness, etc.). These issues will be covered in other documents supporting the decision-making process. Although the scope of this document covers property-cleanup and interim-storage actions, it is applicable to other similar remedial actions. For example, the analyses discussed herein for cleanup activities are applicable to any FUSRAP action that includes site cleanup

  11. Yakima Basin Fish Passage Project, Phase 2

    International Nuclear Information System (INIS)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs

  12. Economics, funding and the influence of politics on the UMTRA Project

    International Nuclear Information System (INIS)

    Hamp, S.

    1993-01-01

    This presentation discusses the factors contributing to the cost of the Uranium Mill Tailings Remediation Action Project and the political process involved in the funding. Topics covered include the following: Funding estimate and growth of estimate; Management actions during process; how the political process worked; cost of completed sites; economic benefit analysis of the project to Colorado; cost reduction program for the UMTRA project

  13. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  14. Students in Action: Engaging Students with Destination Stakeholders

    OpenAIRE

    Craggs, Ruth; Gorman, Catherine; Griffin, Kevin; mottiar, ziene; Quinn, Deirdre; Quinn, Bernadette; Ryan, Theresa

    2015-01-01

    The Students in Action Project in the School of Hospitality Management and Tourism was established in 2012 as a way of engaging students and working with stakeholders in a destination. The overall aim of the project was to immerse students in an active collaborative learning environment within the destination to identify ways in which tourism could be enhanced. In the 2014/2015 academic year the project involved over 300 students from a variety of programmes and modules working with local sta...

  15. Project LIFT: Year 1 Report

    Science.gov (United States)

    Norton, Michael; Piccinino, Kelly

    2014-01-01

    Research for Action (RFA) is currently in the second year of a five-year external evaluation of the Project Leadership and Investment for Transformation (LIFT) Initiative in the Charlotte-Mecklenburg School District (CMS). Project LIFT is a public-private partnership between CMS and the local philanthropic and business communities in Charlotte,…

  16. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  17. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  18. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  19. Reducing Teenage Binge Drinking and Drunk Driving on the Reservation: The Pikanii Action Team

    Science.gov (United States)

    Still Smoking, Dorothy; Bull Shoe, Debbie Whitegrass

    2012-01-01

    The Pikanii Action Team project addressed the issues of teenage drinking and drunk driving on the Blackfeet Reservation. Basing their actions on locally-generated research, the Pikanii Action Team conducted a series of activities and initiatives to promote public awareness and action related to high-risk activities related to drinking. The team's…

  20. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  1. The Headache Action Plan Project for Youth (HAPPY): School Nurses as Facilitators of System Change in Pediatric Migraine Care.

    Science.gov (United States)

    Connelly, Mark; Bickel, Jennifer; Wingert, Tammie; Galemore, Cynthia

    2018-01-01

    Migraine is a common health problem in youth that is ranked highest for disability among neurological conditions and is one of the leading reasons for school absences. Children with migraines frequently are seen by the school nurse for care, sometimes before ever being seen by another healthcare provider for evaluation and treatment. As such, school nurses have the unique opportunity to provide education and resources to children with migraines and their family. This article provides information on the Headache Action Plan Program for Youth (HAPPY), a project involving the provision of live and online migraine education and management resources to school nurses, children, families, and primary care providers in an effort to improve migraine recognition and care in the community.

  2. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  3. Teaching and Learning English through the Project Work. Innovative Pilot Teaching Project in the Pre-school and Primary School Pompeu Fabra, Vallirana, Barcelona. Investigation in Action comprehension in Primary Education

    Directory of Open Access Journals (Sweden)

    Verónica Asensio Arjona

    2017-12-01

    Full Text Available In order to impulse a methodology focused on the student, teachers have to establish the learning conditions that allow them to develop the experimentation, creativity, challenge and individual development. Below this framework, a Project Work of Teaching-Learning English as a foreign language is designed and applied at the state school Pompeu Fabra, Vallirana, Barcelona during the scholar year 2013-2014. The methodology of project work is chosen because it is the most appropriated methodology to achieve a learning focused on the student. It is executed an Action Research of the application of this Project in order to evaluate the competential progress of students. Quantitative and qualitative tools are used to execute the research. The quantitative tools are a standardized test and a Survey. The first one is applied in two moments, in October and in June, to evaluate the progress. The results are analyzed with Excel Tools to calculate the general average and each competence average. On the other hand, the qualitative tools that are used are: The Satisfaction and Self-perception Survey, validated by the University of Barcelona; the Teacher Diary of Observation; and an Evaluation Table for the Speaking. The triangulation of all the information show the English competence of student’s increase; as well as the interest of students in the English learning and the satisfaction in doing it also increases. Moreover, the Project Work is highly qualified by students as: the best activity to learn and enjoy it. This research obtains satisfactory results. It is a sample of innovation in teaching and learning English as a foreign language. As a result, the school decides to continue using the Project Work in the next scholar year.

  4. Projective Simulation compared to reinforcement learning

    OpenAIRE

    Bjerland, Øystein Førsund

    2015-01-01

    This thesis explores the model of projective simulation (PS), a novel approach for an artificial intelligence (AI) agent. The model of PS learns by interacting with the environment it is situated in, and allows for simulating actions before real action is taken. The action selection is based on a random walk through the episodic & compositional memory (ECM), which is a network of clips that represent previous experienced percepts. The network takes percepts as inpu...

  5. Project 2nd Periodic Report - Section 2

    DEFF Research Database (Denmark)

    Healy, Mark; Knowles, Emma; Johnstone, Cameron

    The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive.......The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive....

  6. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  7. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  8. Application study of the project management on the nuclear power projects in China Institute of Atomic Energy

    International Nuclear Information System (INIS)

    Ji Cunxing

    2012-01-01

    The article introduced the actions of foreign and domestic nuclear power technical services in China Institute of Atomic Energy, the project management theory is applied to the organization, implementation and control of the nuclear power projects. It is analyzed the quality, schedule , investment etc of nuclear power projects, the improving measures and suggestions are bring forward on the project management organization, quality assurance, reduce cost etc. It will raise its nuclear power project management level in China Institute of Atomic Energy. (author)

  9. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  10. An approach to knowledge management for EUROSAFE projects

    International Nuclear Information System (INIS)

    Goldschmidt, F.; Gelder, P. De; Beraha, D.

    2005-01-01

    The objective of a knowledge management system (KMS) in the field of Nuclear Safety Assessment is to keep competence in expertise and research at the best level. This contribution proposes a diagram of KM organization associated with the Eurosafe Safety Assessment Guide project proposal. The aim of the KM action is to test and bring forward a generic and perennial method of knowledge management adapted to the safety culture. It will be interested to support the access to information useful for the practices of expertise by organizing a knowledge mapping, supporting the exchanges of know-how by the consolidation of a competence network and the externalization of expert knowledge. This article presents the actions in progress at AVN, GRS and IRSN, and suggests some principles based on experience feedbacks drawn from the literature. It is not supposed to be exhaustive but rather to encourage other Technical Support Organizations to take part in this KM action associated with the technical project. We suggest to organize the KM action in three phases: (1) definition of a KM Strategy adapted to the technical project; (2) implementation of KM selected actions (actors sensitization, tests of KM methods, etc); (3) choice and fulfillment of effective and perennial KM solutions. (authors)

  11. Typology of public outreach for biodiversity conservation projects in Spain.

    Science.gov (United States)

    Jiménez, Amanda; Iniesta-Arandia, Irene; Muñoz-Santos, Maria; Martín-López, Berta; Jacobson, Susan K; Benayas, Javier

    2014-06-01

    Conservation education and outreach programs are a key approach to promote public understanding of the importance of biodiversity conservation. We reviewed 85 biodiversity conservation projects supported by the Spanish Ministry of Environment's Biodiversity Foundation. Through content analysis and descriptive statistics, we examined how the projects carried out communication, education, and public awareness and participation (CEPA) actions. We also used multivariate statistical analysis to develop a typology of 4 classes of biodiversity conservation projects on the basis of CEPA implementation. The classifications were delineated by purpose of CEPA, level of integration of CEPA actions, type of CEPA goals, main CEPA stakeholders, and aim of conservation. Our results confirm the existence of 2 key positions: CEPA has intrinsic value (i.e., they supposed the implementation of any CEPA action indirectly supported conservation) and CEPA is an instrument for achieving conservation goals. We also found that most CEPA actions addressed general audiences and school children, ignored minority groups and women, and did not include evaluation. The characteristics of the 4 types of projects and their frequency of implementation in the sample reflect the need for better integration of different types of actions (communication, education, and participation) and improved fostering of participation of multiple stakeholders in developing policy and implementing management strategies. © 2014 Society for Conservation Biology.

  12. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  13. Hybrid Monte Carlo algorithm with fat link fermion actions

    International Nuclear Information System (INIS)

    Kamleh, Waseem; Leinweber, Derek B.; Williams, Anthony G.

    2004-01-01

    The use of APE smearing or other blocking techniques in lattice fermion actions can provide many advantages. There are many variants of these fat link actions in lattice QCD currently, such as flat link irrelevant clover (FLIC) fermions. The FLIC fermion formalism makes use of the APE blocking technique in combination with a projection of the blocked links back into the special unitary group. This reunitarization is often performed using an iterative maximization of a gauge invariant measure. This technique is not differentiable with respect to the gauge field and thus prevents the use of standard Hybrid Monte Carlo simulation algorithms. The use of an alternative projection technique circumvents this difficulty and allows the simulation of dynamical fat link fermions with standard HMC and its variants. The necessary equations of motion for FLIC fermions are derived, and some initial simulation results are presented. The technique is more general however, and is straightforwardly applicable to other smearing techniques or fat link actions

  14. Organizational knowledge building through action research

    DEFF Research Database (Denmark)

    Hansen, Lone Hersted; Frimann, Søren

    learning and change processes in relation to organizational knowledge building and knowledge sharing. The project draws on the dialogue tradition within action research (Coghlan et al.; 2010; Reason & Bradbury, 2001; Ripamonti et al 2016) and social constructionist ideas (Cunliffe 2002, 2004; Gergen 2003...... 2005; Chia 1996; Tsoukas, & Chia (2002)) based on a dialogical approach. Two internal consultants fulfill the roles as process facilitators of the action research process, and the two researchers from Aalborg University (LH and SF) are contributing with ideas, sparring, qualitative research design...... in a collaborative setting for learning, involving employees and managers, including as well the sharing of knowledge throughout the organization? In addition, we are curious to examine whether action research as an inquiry for learning and change can act as an alternative to the New Public Management paradigm...

  15. The Danish Organic Action Plan 2020

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Lassen, Anne Dahl; Løje, Hanne

    2015-01-01

    Objective With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food...... procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Design Comparison study measuring organic food procurement by applying two different methods, one based on the use...... organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Subjects Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). Results A high significant correlation coefficient was found between the two...

  16. Together We Can: Assessing the Impact of Women's Action Groups ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project will evaluate the impact of India's Mahila Samakhya (MS), the world's largest ... light on the role of women's action groups in catalyzing social and economic change. ... The data will include variables related to labour market outcomes, gender ... L'union fait la force : Étudier les répercussions des groupes d'action ...

  17. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  18. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  19. Geometric modular action and transformation groups

    International Nuclear Information System (INIS)

    Summers, S.J.

    1996-01-01

    We study a weak form of geometric modular action, which is naturally associated with transformation groups of partially ordered sets and which provides these groups with projective representations. Under suitable conditions it is shown that these groups are implemented by point transformations of topological spaces serving as models for space-times, leading to groups which may be interpreted as symmetry groups of the space-times. As concrete examples, it is shown that the Poincare group and the de Sitter group can be derived from this condition of geometric modular action. Further consequences and examples are discussed. (orig.)

  20. Action Research in Inter-organisational Networks - Impartial studies or the Trojan Horse?

    DEFF Research Database (Denmark)

    Goduscheit, René Chester; Bergenholtz, Carsten; Jørgensen, Jacob Høj

    2008-01-01

    Traditionally, the literature on action research has been aimed at intra-organisational issues. These studies have distinguished between two researcher roles: The problem-solver and the observer. This article addresses the distinct challenges of action research in inter-organisational projects. I...

  1. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  2. Turtle Watch: Community Engagement and Action

    Science.gov (United States)

    Lewis, Elaine; Baudains, Catherine

    2015-01-01

    Many threats face the freshwater turtle, Chelodina colliei, also known as the oblong turtle. A community education project, Turtle Watch, focused on this target species and enabled effective conservation action to be implemented. Turtle Watch was conducted in the Perth Metropolitan Area of Western Australia, as the oblong turtle inhabits the…

  3. Weldon Spring Site environmental report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year

  4. A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, J [Abt Environmental Research, Boulder, CO (United States); Wagner, C. [Abt Environmental Research, Boulder, CO (United States); Renfrow, S. [Abt Environmental Research, Boulder, CO (United States)

    2015-09-03

    The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

  5. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  6. 75 FR 56094 - Delta-Mendota Canal Intertie Project

    Science.gov (United States)

    2010-09-15

    ... Project AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Record of Decision and... maintain a new 69-kilovolt (kV) transmission line and fiber optic cable for delivery of project use power...) Delta-Mendota Canal (DMC)/California Aqueduct Intertie (Intertie) project. The Intertie, including the...

  7. Statistics in Action: The Story of a Successful Service-Learning Project

    Science.gov (United States)

    DeHart, Mary; Ham, Jim

    2011-01-01

    The purpose of this article is to share the stories of an Introductory Statistics service-learning project in which students from both New Jersey and Michigan design and conduct phone surveys that lead to publication in local newspapers; to discuss the pedagogical benefits and challenges of the project; and to provide information for those who…

  8. Nationally Appropriate Mitigation Action: Understanding NAMA Cycle

    DEFF Research Database (Denmark)

    Sharma, Sudhir; Desgain, Denis DR

    There is no internationally defined or agreed Nationally Appropriate Mitigation Action(NAMA) cycle, as was the case, for example, with the Clean Development Mechanisms (CDM) project cycle. However, there are some common steps that NAMA identification, formulation, and implementation will all go...

  9. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs

  10. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  11. 77 FR 10767 - Rate Adjustments for Indian Irrigation Projects

    Science.gov (United States)

    2012-02-23

    ... Irrigation Project on the proposed rates about the following issues: (1) The methodology for O&M rate setting..., Irrigation Project Manager, (Project operations and management contracted to Tribes), R.R.1, Box 980, Harlem... Projects AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of rate adjustments. SUMMARY: The...

  12. [How to understand and facilitate return to school of high school students treated for cancer: analysis of a sociology research-action project].

    Science.gov (United States)

    Rollin, Zoé

    2015-01-01

    Based on a sociology research-action project, this article analyses the specific issue of return to school of high school students with cancer. Three detailed cases, illustrating the global results of the study, are presented to highlight the academic trajectories of these students. This situation has a particular impact on juvenile sociability. Moreover, the education of these students does not comply with French educational standards and is very complex for professionals. Finally, social inequalities in education are reinforced by the experience of serious illness, as pedagogical negotiations are even more complex due to the fact that families are not familiar with school practices.

  13. Radiation Area Remedial Action FY 1996 summary report

    International Nuclear Information System (INIS)

    Hayward, W.M.

    1996-11-01

    The Radiation Area Remedial Action (RARA) project is responsible for the interim stabilization and maintenance of the majority of the inactive waste sites at the Hanford Site. These waste sites include approximately 400 individual sites and 4,000 acres. Three facilities were removed from the RARA list near the end of fiscal year (FY) 1996P: the 218-W-4B, 218-E-10, and 218-E-12B Burial Grounds. These three facilities are treatment, storage, and disposal (TSD) sites assigned to Fluor Daniel Hanford. Therefore, the RARA project will no longer perform activities on the inactive portions to maintain clear lines of responsibility (fully with Fluor Daniel Hanford). RARA activities are broken into two broad categories: interim stabilization, and surveillance and maintenance (S and M). Interim stabilization addresses major corrective actions for sites with radioactive surface contamination. A site continues to require S and M once it has received interim stabilization. Vegetation management is a significant activity under the RARA project. The goal is to control vegetation that may grow and spread radioactive contamination

  14. 24 CFR 266.120 - Actions for which sanctions may be imposed.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.120 Actions for which sanctions may be imposed. Results of... provisions with respect to individual projects; (12) Maintain a default ratio acceptable to HUD relative to...

  15. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  16. 78 FR 1991 - Major Capital Investment Projects

    Science.gov (United States)

    2013-01-09

    ... Administration 49 CFR Part 611 Major Capital Investment Projects; Notice of Availability of Proposed New Starts... Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Final rule. SUMMARY... capital investments seeking funding under the discretionary ``New Starts'' and ``Small Starts'' programs...

  17. Maintaining project consistency with transportation plans throughout the project life cycle with an emphasis on maintaining air quality conformity: technical report.

    Science.gov (United States)

    2016-07-01

    Federal and state transportation planning statutory and regulatory laws require transportation projects to be : consistent with transportation plans and improvement programs before a federal action can be taken on a : project requiring one. Significa...

  18. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  19. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the 'Federal Facility Agreement and Consent Order' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions

  20. Digital food activism: Values, expertise and modes of action

    OpenAIRE

    Eli, Karin; Schneider, Tanja; Dolan, Catherine; Ulijaszek, Stanley

    2018-01-01

    New information and communication technologies (ICTs) increasingly enable social action and civic organisation, on both local and global scales. Ranging from social media platforms such as Facebook and Twitter, to mobile apps such as Buycott, and to data sharing wiki platforms and hacktivist projects, the activist landscape is rapidly shifting, collapsing geographic boundaries to form new issue publics and fast, sometimes mercurial, collective action. Within these emerging digital platforms f...

  1. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  2. Performative Actions in E-Adoption Processes: Strategic Efforts in a Local Government

    DEFF Research Database (Denmark)

    Hjelholt, Morten

    2015-01-01

    In this paper the concept of performative action is introduced to address how individuals can engage in IT adoption processes. The study investigates how local government employees adopt and localize ideas from a Danish National IT initiative called eDay3. Particularly the actions of a project...... and variance of the specific local government. Second, a feedback loop re-attaching the localized project to the national reform program in order to maintain and protect the newly formed local practices. The study concludes that individuals actively struggle for social positions in IT adoption processes...

  3. Dissemination and Exploitation: Project Goals beyond Science

    Science.gov (United States)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  4. Developing an action-based health and safety training project in southern China.

    Science.gov (United States)

    Szudy, Betty; O'Rourke, Dara; Brown, Garrett D

    2003-01-01

    A project brought together international footwear manufacturers, labor rights groups, local contract factories, and occupational health professionals to strengthen factory health and safety programs in southern China. Steps involved in the two-year project, including needs assessment, interviews and focus groups with workers and supervisors; design and development of a participatory workshop; development of plant-wide health and safety committees in three footwear factories; and evaluation project impact, are discussed. The project significantly increased occupational safety and health knowledge, and hazards in the factories were identified and corrected. Successes and challenges faced by three functioning worker-management health and safety committees are discussed. Key elements to create effective programs with meaningful participation by workers include: 1) developing clear guidelines that enable multi-stakeholder groups to collaborate; 2) obtaining top-level management support; 3) building workers' knowledge and capacity to fully participate; 4) involving local labor rights groups and occupational professionals in support and technical assistance; and 5) connecting project goals to larger issues within a country and the global economy.

  5. 18 CFR 380.4 - Projects or actions categorically excluded.

    Science.gov (United States)

    2010-04-01

    ... water power projects under Part I of the Federal Power Act, of “as built” or revised drawings or... facility (other than compression) solely within an existing building within a natural gas facility (other...) Wilderness areas; (iii) Wild and scenic rivers; (iv) Wetlands; (v) Units of the National Park System...

  6. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  7. Understanding asphalt compaction: An action research strategy

    NARCIS (Netherlands)

    Miller, Seirgei Rosario; ter Huerne, Henderikus L.; Doree, Andries G.; Amaratunga, Dilanthi

    2007-01-01

    In Hot Mix Asphalt (HMA) construction, rollers provide the compaction energy required to produce a specified density. However, little is known about the heuristics used by the roller operators. This study forms part of a larger action research project focussing on the improvement of the HMA paving

  8. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    International Nuclear Information System (INIS)

    1995-01-01

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE's UMTRA Project is the world's largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation

  9. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  10. All projects related to | Page 535 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Aligning the National S&T Policy with the National Sustainable Development ... Project. Sri Lanka does not have an official science and technology (S&T) policy. ... Project. This action research project will study innovation in service delivery by local ... Topic: SOLID WASTES, WASTE MANAGEMENT, WASTE DISPOSAL.

  11. Demonstrating managed aquifer recharge as a solution for climate change adaptation: results from Gabardine project and asemwaterNet coordination action in the Algarve region (Portugal

    Directory of Open Access Journals (Sweden)

    João Paulo Lobo Ferreira

    2014-09-01

    Full Text Available In the Algarve southern Portugal region, Managed Aquifer Recharge (MAR research activities have been developed to provide not only water surplus storage in aquifers during wet years, focusing in the Querença-Silves aquifer (FP6 ASEMWATERNet Coordination Action, but also groundwater quality rehabilitation in the Campina de Faro aquifer (FP6 Gabardine Project. Following MAR research potentialities in southern Portugal, this paper describes the objectives, conceptual demonstration, background and capabilities of one of the selected Circum-Mediterranean pilot sites (in Portugal that will be researched in the new FP7-ENV-2013-WATER-INNO-DEMO MARSOL project, which started Dec. 1st, 2013. In the Algarve pilot site, several case-study areas will be located in the Querença-Silves aquifer and in the Campina de Faro aquifer.

  12. A Meta-Analysis of Local Climate Change Adaptation Actions ...

    Science.gov (United States)

    Local governments are beginning to take steps to address the consequences of climate change, such as sea level rise and heat events. However, we do not have a clear understanding of what local governments are doing -- the extent to which they expect climate change to affect their community, the types of actions they have in place to address climate change, and the resources at their disposal for implementation. Several studies have been conducted by academics, non-governmental organizations, and public agencies to assess the status of local climate change adaptation. This project collates the findings from dozens of such studies to conduct a meta-analysis of local climate change adaptation actions. The studies will be characterized along several dimensions, including (a) methods used, (b) timing and geographic scope, (c) topics covered, (d) types of adaptation actions identified, (e) implementation status, and (f) public engagement and environmental justice dimensions considered. The poster presents the project's rationale and approach and some illustrative findings from early analyses. [Note: The document being reviewed is an abstract in which a poster is being proposed. The poster will enter clearance if the abstract is accepted] The purpose of this poster is to present the research framework and approaches I am developing for my ORISE postdoctoral project, and to get feedback on early analyses.

  13. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  14. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  15. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  16. Knowledge Integration and Inter-Disciplinary Communication in Action Research

    Directory of Open Access Journals (Sweden)

    Hahn Heidi Ann

    2014-08-01

    Full Text Available In a plenary talk at WMSCI 2012 entitled "Planning for Action Research: Looking at Practice through a Different Lens," this author asserted that behavioral science practitioners, often "back into" action research – they start out doing a process improvement or intervention and discover something along the way, i.e., generalizable knowledge, that seems worthwhile to share with their community of practice. It was further asserted that, had the efforts been conceived of as research from the outset, the contributions to the body of knowledge would be more robust and the utility of the projects would improve as well. This paper continues on that theme. Action research and process improvement methods are briefly described and compared. A comparison of two Los Alamos National Laboratory engineering ethics training projects – one developed using a process improvement framework, the other using an action research framework – is put forth to provide evidence that use of a research "lens" can enhance behavioral science interventions and the knowledge that may result from them. The linkage between the Specifying Learning and Diagnosing stages of the Action Research Cycle provides one mechanism for integrating the knowledge gained into the product or process being studied and should provide a reinforcing loop that leads to continual improvement. The collaborative relationships among researchers and the individual, group, or organization that is the subject of the imp rovement op p ortunity (the "client", who are likely from very different backgrounds, and the interpretive epistemology that are among the hallmarks of action research also contribute to the quality of the knowledge gained. This paper closes with a discussion of how Inter-Disciplinary Communication is embedded within the action research paradigm and how this likely also enriches the knowledge gained.

  17. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  18. The search conference as a method in planning community health promotion actions

    Directory of Open Access Journals (Sweden)

    Eva Magnus

    2016-08-01

    Full Text Available Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives.

  19. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  20. Performance of core exit thermocouple for PWR accident management action in vessel top break LOCA simulation experiment at OECD/NEA ROSA project

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Nakamura, Hideo

    2009-01-01

    Presented are experiment results of the Large Scale Test Facility (LSTF) conducted at the Japan Atomic Energy Agency (JAEA) with a focus on core exit thermocouple (CET) performance to detect core overheat during a vessel top break loss-of-coolant accident (LOCA) simulation experiment. The CET temperatures are used to start accident management (AM) action to quickly depressurize steam generator (SG) secondary side in case of core temperature excursion. Test 6-1 is first test of the OECD/NEA ROSA Project started in 2005, simulating withdraw of a control rod drive mechanism penetration nozzle at the vessel top head. The break size is equivalent to 1.9% cold leg break. The AM action was initiated when CET temperature rose up to 623K. There was no reflux water fallback onto the CETs during the core heat-up period. The core overheat, however, was detected with a time delay of about 230s. In addition, a large temperature discrepancy was observed between the CETs and the hottest core region. This paper clarifies the reason of time delay and temperature discrepancy between the CETs and heated core during boil-off including three-dimensional steam flows in the core and core exit. The paper discusses applicability of the LSTF CET performance to pressurized water reactor (PWR) conditions and a possibility of alternative indicators for earlier AM action than in Test 6-1 is studied by using symptom-based plant parameters such as a reactor vessel water level detection. (author)

  1. Sequencing Conservation Actions Through Threat Assessments in the Southeastern United States

    Science.gov (United States)

    Robert D. Sutter; Christopher C. Szell

    2006-01-01

    The identification of conservation priorities is one of the leading issues in conservation biology. We present a project of The Nature Conservancy, called Sequencing Conservation Actions, which prioritizes conservation areas and identifies foci for crosscutting strategies at various geographic scales. We use the term “Sequencing” to mean an ordering of actions over...

  2. Research to Action: an evaluation.

    Science.gov (United States)

    Murphy, Gail Tomblin; Alder, Rob; MacKenzie, Adrian; Cook, Amanda; Maddalena, Victor

    2012-03-01

    The evaluation of the Research to Action project was conducted using an Outcome Mapping (OM) methodology (Earl et al. 2001) with a mixed-methods, repeat survey (before/after) study design. This design uses concurrent measurement of process and outcome indicators at baseline and follow-up. The RTA project proved effective at improving work environments and thereby promoting the retention and recruitment of nurses. Nurses involved in the RTA initiatives had a higher perception of leadership and support in their units, improved job satisfaction, increased empowerment and occupational commitment, and a greater intention to stay on the job.The pilot projects were most successful when there were clearly stated objectives, buy-in from nurses, support from the steering committee and management, and adequate communication among stakeholders. Committed coordination and leadership, both locally and nationally, were central to success.Considerable evidence has documented the challenges facing Canada's nursing human resources and their workplaces, such as high levels of turnover, excessive use of overtime and persistent shortages. There is a growing imperative to translate this research into action, and much of the available evidence presents viable policy alternatives for consideration. For example, a recent national synthesis report (Maddalena and Crupi 2008) recommended that, in consultation with stakeholders, processes should be put in place to share knowledge and best practices in nursing management, practice, staffing models and innovations in workplace health and well-being.Nurses across the country report a desire to be more involved in decisions affecting them and their patients (Wortsman and Janowitz 2006). A recent study on the shortage of registered nurses in Canada (Tomblin Murphy et al. 2009) highlighted the need for collaboration among governments, employers, unions and other stakeholders to improve working conditions for nurses. Another report notes the

  3. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  4. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-08-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  5. 77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-06-08

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  6. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  7. Human Action Recognition Using Ordinal Measure of Accumulated Motion

    Directory of Open Access Journals (Sweden)

    Kim Wonjun

    2010-01-01

    Full Text Available This paper presents a method for recognizing human actions from a single query action video. We propose an action recognition scheme based on the ordinal measure of accumulated motion, which is robust to variations of appearances. To this end, we first define the accumulated motion image (AMI using image differences. Then the AMI of the query action video is resized to a subimage by intensity averaging and a rank matrix is generated by ordering the sample values in the sub-image. By computing the distances from the rank matrix of the query action video to the rank matrices of all local windows in the target video, local windows close to the query action are detected as candidates. To find the best match among the candidates, their energy histograms, which are obtained by projecting AMI values in horizontal and vertical directions, respectively, are compared with those of the query action video. The proposed method does not require any preprocessing task such as learning and segmentation. To justify the efficiency and robustness of our approach, the experiments are conducted on various datasets.

  8. Climate Change Action Fund: public education and outreach. Change: think climate

    International Nuclear Information System (INIS)

    2001-05-01

    This illustrated booklet provides a glimpse of the many creative approaches being adopted by educators, community groups, industry associations and governments at all levels to inform Canadians about the causes and effects of climate change. It also provides suggestions about how each individual person can contribute to reduce greenhouse gas emissions through residential energy efficiency, by participating in ride-share programs, by planting trees and a myriad of other community action projects and public awareness campaigns. The booklet describes educational resources and training available to teachers, science presentations, climate change workshops, public awareness initiatives, community action on climate change, and sector-specific actions underway in the field of transportation and in improving energy efficiency in residential and large buildings. Descriptive summaries of the activities of organizations involved in climate change advocacy and promotion, and a list of contacts for individual projects also form part of the volume

  9. Automating ActionScript Projects with Eclipse and Ant

    CERN Document Server

    Koning, Sidney

    2011-01-01

    Automating repetitive programming tasks is easier than many Flash/AS3 developers think. With the Ant build tool, the Eclipse IDE, and this concise guide, you can set up your own "ultimate development machine" to code, compile, debug, and deploy projects faster. You'll also get started with versioning systems, such as Subversion and Git. Create a consistent workflow for multiple machines, or even complete departments, with the help of extensive Ant code samples. If you want to work smarter and take your skills to a new level, this book will get you on the road to automation-with Ant. Set up y

  10. Preparing Students for (Inter-)Action with Activity Theory

    DEFF Research Database (Denmark)

    Bødker, Susanne; Klokmose, Clemens Nylandsted

    2012-01-01

    In this paper we explore recent developments in activity theoretical HCI with the purpose of preparing designers for action. The paper discusses two projects where students engaged in iterative design applying fundamental principles from Activity Theory. They had been introduced to these principles...

  11. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  12. CLICing into action

    CERN Multimedia

    Barbara Warmbein

    2015-01-01

    Putting its acronym into action, the Compact Linear Collider (CLIC) collaboration is testing its first compact accelerator module in the CTF3 test facility. Fed by high-power waveguides, cables and cooling tubes, the module has all the functions of future CLIC modules and allows the experts to test all the features, including frequency, losses, damping, acceleration and deceleration.   The new CLIC module in the CTF3 test facility. CLIC is one of the potential follow-up projects to the LHC, alongside the International Linear Collider (ILC) and the Future Circular Collider (FCC) studies. Instead of smashing protons into protons, it is designed to collide electrons with positrons. Following the publication of its CDR in 2012, the CLIC collaboration entered the project preparation phase - testing its unique technology, making improvements and taking a closer look at the cost of the individual components. This is where the new module comes in. While many of the techniques and technologies neede...

  13. An introduction to the HighARCS Integrated Action Plans, with an institutions, policies and conflicts perspective

    DEFF Research Database (Denmark)

    Lund, Søren

    This report is an introduction focused on institutions, policies and conflicts aspects, for the Integrated Action Plans (IAPs) produced by the HighARCS project for the 5 sites in China, India and Vietnam......This report is an introduction focused on institutions, policies and conflicts aspects, for the Integrated Action Plans (IAPs) produced by the HighARCS project for the 5 sites in China, India and Vietnam...

  14. A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

    Energy Technology Data Exchange (ETDEWEB)

    Mitra, Joydeep [Michigan State Univ., East Lansing, MI (United States); Ben-Idris, Mohammed [Univ. of Nevada, Reno, NV (United States); Faruque, Omar [Florida State Univ., Tallahassee, FL (United States); Backhaus, Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Deb, Sidart [LCG Consulting, Los Altos, CA (United States)

    2016-03-30

    This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Development of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization

  15. 76 FR 66117 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2011-10-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... notice lists the projects, described below, receiving approval for the consumptive use of water pursuant...

  16. 76 FR 53526 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2011-08-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... lists the projects, described below, receiving approval for the consumptive use of water pursuant to the...

  17. 76 FR 42159 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2011-07-18

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... lists the projects, described below, receiving approval for the consumptive use of water pursuant to the...

  18. 77 FR 4859 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-01-31

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... notice lists the projects, described below, receiving approval for the consumptive use of water pursuant...

  19. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  20. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.; Bukhari, Duaa

    2013-01-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  1. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.

    2013-06-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  2. Reducing inequalities in health and access to health care in a rural Indian community: an India-Canada collaborative action research project.

    Science.gov (United States)

    Haddad, Slim; Narayana, Delampady; Mohindra, Ks

    2011-11-08

    Inadequate public action in vulnerable communities is a major constraint for the health of poor and marginalized groups in low and middle-income countries (LMICs). The south Indian state of Kerala, known for relatively equitable provision of public resources, is no exception to the marginalization of vulnerable communities. In Kerala, women's lives are constrained by gender-based inequalities and certain indigenous groups are marginalized such that their health and welfare lag behind other social groups. The goal of this socially-engaged, action-research initiative was to reduce social inequalities in access to health care in a rural community. Specific objectives were: 1) design and implement a community-based health insurance scheme to reduce financial barriers to health care, 2) strengthen local governance in monitoring and evidence-based decision-making, and 3) develop an evidence base for appropriate health interventions. Health and social inequities have been masked by Kerala's overall progress. Key findings illustrated large inequalities between different social groups. Particularly disadvantaged are lower-caste women and Paniyas (a marginalized indigenous group), for whom inequalities exist across education, employment status, landholdings, and health. The most vulnerable populations are the least likely to receive state support, which has broader implications for the entire country. A community based health solidarity scheme (SNEHA), under the leadership of local women, was developed and implemented yielding some benefits to health equity in the community-although inclusion of the Paniyas has been a challenge. The Canadian-Indian action research team has worked collaboratively for over a decade. An initial focus on surveys and data analysis has transformed into a focus on socially engaged, participatory action research. Adapting to unanticipated external forces, maintaining a strong team in the rural village, retaining human resources capable of analyzing

  3. Reducing inequalities in health and access to health care in a rural Indian community: an India-Canada collaborative action research project

    Directory of Open Access Journals (Sweden)

    Mohindra KS

    2011-11-01

    Full Text Available Abstract Background Inadequate public action in vulnerable communities is a major constraint for the health of poor and marginalized groups in low and middle-income countries (LMICs. The south Indian state of Kerala, known for relatively equitable provision of public resources, is no exception to the marginalization of vulnerable communities. In Kerala, women’s lives are constrained by gender-based inequalities and certain indigenous groups are marginalized such that their health and welfare lag behind other social groups. The research The goal of this socially-engaged, action-research initiative was to reduce social inequalities in access to health care in a rural community. Specific objectives were: 1 design and implement a community-based health insurance scheme to reduce financial barriers to health care, 2 strengthen local governance in monitoring and evidence-based decision-making, and 3 develop an evidence base for appropriate health interventions. Results and outcomes Health and social inequities have been masked by Kerala’s overall progress. Key findings illustrated large inequalities between different social groups. Particularly disadvantaged are lower-caste women and Paniyas (a marginalized indigenous group, for whom inequalities exist across education, employment status, landholdings, and health. The most vulnerable populations are the least likely to receive state support, which has broader implications for the entire country. A community based health solidarity scheme (SNEHA, under the leadership of local women, was developed and implemented yielding some benefits to health equity in the community—although inclusion of the Paniyas has been a challenge. The partnership The Canadian-Indian action research team has worked collaboratively for over a decade. An initial focus on surveys and data analysis has transformed into a focus on socially engaged, participatory action research. Challenges and successes Adapting to

  4. 33 CFR 211.18 - Action by claimant.

    Science.gov (United States)

    2010-07-01

    ... DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.18 Action by claimant. Real estate claims may be presented by the owner of the property or his duly authorized agent or legal representative. The word “owner”, as so used, includes...

  5. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  6. Collective action, clientelism and connectivity

    DEFF Research Database (Denmark)

    Shami, Mahvish

    that the unequal relationship between landlords and peasants does not, in and by itself, block peasant collective action. Rather, it is the interaction between clientelism and isolation that allow patrons to block community based projects. Despite still relying on powerful landlords, peasants in connected villages...... face no such constraints. On the contrary, their patrons assisted them in their collective endeavours, making the hierarchical network an added resource for peasants to rely upon....

  7. Projective interpretation of some doubly special relativity theories

    International Nuclear Information System (INIS)

    Jafari, N.; Shariati, A.

    2011-01-01

    A class of projective actions of the orthogonal group on the projective space is being studied. It is shown that the Fock-Lorentz and Magueijo-Smolin transformations known as doubly special relativity are such transformations. The formalism easily leads to new types of transformations.

  8. Novel Trypanosomatid-Bacterium Association: Evolution of Endosymbiosis in Action

    Czech Academy of Sciences Publication Activity Database

    Kostygov, A.Y.; Dobáková, Eva; Grybchuk-Ieremenko, A.; Váhala, D.; Maslov, D. A.; Votýpka, Jan; Lukeš, Julius; Yurchenko, V.

    2016-01-01

    Roč. 7, č. 2 (2016), č. článku e01985-15. ISSN 2150-7511 R&D Projects: GA ČR(CZ) GA14-23986S EU Projects: European Commission(XE) 316304 - MODBIOLIN Grant - others:EU COST Action CM1307 Institutional support: RVO:60077344 Keywords : leader rna gene * insect trypanosomatids * monoxenous trypanosomatids * neotropical heteroptera * Trichomonas vaginalis * phylogenetic analysis Subject RIV: EB - Genetics ; Molecular Biology Impact factor: 6.956, year: 2016

  9. The use of web2 tools in action research

    DEFF Research Database (Denmark)

    Kolbæk, Raymond; Steensgaard, Randi; Angel, Sanne

    2017-01-01

    . Furthermore we try to evidence-based the concept of "Sample handlings" and examines whether this concept can be used as a flexible methodological tool for developing workflow that promotes patient participation in their own rehabilitation. We use a action research design to identify actual problems, develop......, to test, evaluate and implement specific actions to promote patient participation in rehabilitation. Four nurses and four social and health assistants is having a "co-researcher" active role. The interaction with the researchers creates a reflexive and dynamic process with a learning and competence......Abstract Content: Major challenges occurs, when trying to implement research in clinical practice. In the West Danish Center for Spinal Cord Injury, we are doing a practice-based ph.d. project, that involves the practice field's own members as co-researchers. In the management of the project we use...

  10. Project transition to risk based corrective action

    International Nuclear Information System (INIS)

    Judge, J.M.; Cormier, S.L.

    1996-01-01

    Many states have adopted or are considering the adoption of the America Society for Testing and Materials (ASTM) Standard E 1739, Standard for Risk Based Corrective Action (RBCA) Applied to Petroleum Release Sites. This standard is being adopted to regulate leaking underground storage tank (LUST) sites. The case studies of two LUST sites in Michigan will be presented to demonstrate the decision making process and limiting factors involved in transitioning sites to the RBCA program. Both of these case studies had been previously investigated and one was actively remediated. The first case study involves a private petroleum facility where soil and ground water have been impacted. Remediation involved a ground water pump and treat system. Subsequent monitoring during system operation indicated that analytical data were still above the Tier 1 RBSLs but below the Tier 2 SSTLs. The closure strategy that was developed was based on the compounds of concern that were below the SSTLs. A deed restriction was also developed for the site as an institutional control. The second LUST site exhibited BTEX concentrations in soil and ground water above the Tier 1 RBSLs. Due to the exceedence of the Tier 1 RBSLs, the second site required a Tier 2 assessment to develop SSTLs as remedial objectives and remove hot spots in the soil and treat the ground water to achieve closure. Again, a deed restriction was instituted along with a performance monitoring plan

  11. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms

  12. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  13. Transforming Language Ideologies through Action Research: A Case Study of Bilingual Science Learning

    Science.gov (United States)

    Yang, Eunah

    2012-01-01

    This qualitative case study explored a third grade bilingual teacher's transformative language ideologies through participating in a collaborative action research project. By merging language ideologies theory, Cultural Historical Activity Theory (CHAT), and action research, I was able to identify the analytic focus of this study. I analyzed…

  14. Learning from participation : Quick scan of Participatory Action

    NARCIS (Netherlands)

    Verhagen, H.J.; Van der Pol, C.; Glasius, A.; Winnubst, M.

    2005-01-01

    Projects using innovative concepts in coastal defence -like ComCoast- can benefit greatly from participatory action. It can lead to innovative solutions with a broad societal support base, as is shown in the plan for water storage in the Overdiepse polder and the inundation compensation scheme for

  15. Twenty Years on: Reflections on the CEDISYS Project

    DEFF Research Database (Denmark)

    Boudol, Gerard; Castellani, Ilaria; Hennessy, Matthew

    2008-01-01

    We recall some memories of the Esprit Basic Research Action CEDISYS, a small, well-focussed and fruitful project which brought together researchers at the meeting point of true concurrency and process algebra, in the period 1988-1991. The project was initiated and effectively animated by Ugo...

  16. Challenges of youth participation in participatory action research

    DEFF Research Database (Denmark)

    Wattar, Laila; Fanous, Sandrine; Berliner, Peter

    2012-01-01

    Paamiut Youth Voice (PYV) is a Participatory Action Research (PAR) project, exploring youth perceptions, experiences, and the promotion of well-being in Paamiut, Greenland. Active youth participation remained a key challenge in the development of the local community through the locally initiated...... community mobilisation programme Paamiut Asasara. The challenges of youth participation in PYV are investigated in order to explore the implications of youth participation in PAR projects. The discussion of challenges is based on a methodological account of experiences from the research process clarifying...

  17. 78 FR 26417 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Science.gov (United States)

    2013-05-06

    ... the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Interstate 90 (I-90) Snoqualmie Pass... to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the listed... claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Liana Liu, Area...

  18. Revision of the protective action guides manual for nuclear incidents

    International Nuclear Information System (INIS)

    DeCair, S.; MacKinney, J.

    2007-01-01

    EPA's 1992 Manual of Protective Action Guides and Protective Actions for Nuclear Incidents, referred to as the PAG Manual, is a radiological emergency planning and response tool for emergency management officials at the Federal, state, tribal, and local levels. A Protective Action Guide is defined as, the projected dose to reference man, or other defined individual, from a release of radioactive material at which a specific protective action to reduce or avoid that dose is recommended'. The updated version of the PAG Manual accomplishes these key objectives: applying the existing 1992 protective action guides and protective actions to new radiological and nuclear scenarios of concern; updating the dosimetry basis; lowering the recommended dose for administration of stable iodine; providing new guidance concerning consumption of drinking water during or after a radiological emergency; updating the dosimetry basis for all derived levels, and, adding guidance for dealing with long-term site restoration following a major radiological release. (author)

  19. Reducing our Carbon Footprint - an initial action plan for Northern Ireland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-14

    In the Energy White Paper, Our Energy Future - Creating a low carbon economy, the UK Government accepted the Royal Commission on Environmental Pollution's (RCEP) recommendations on how the UK should address the threat of climate change. These recommendations included the early development of a concerted, coordinated and integrated strategy across all Government Departments that would put the UK economy on an early path to reducing carbon dioxide (CO{sub 2}) emissions by at least 60% by 2050. Responding to this challenge, the Carbon Trust and Invest NI sponsored a project to develop an action plan that will set Northern Ireland on the path to realising the deep reductions in carbon emissions needed to reach this target. During the project, the prospects for reducing CO{sub 2} emissions (or carbon emissions) in five key sectors of the economy were examined. The main conclusion of this work was that it was possible to realise a 60% reduction in carbon emissions by 2050, provided early action is taken to set Northern Ireland on the path to a low carbon economy. The project also prepared an initial action plan to help initiate change. This consists of: Immediate actions, including encouraging the uptake of energy efficiency measures, revising building regulations and changing public procurement procedures. Developing options for the future, by supporting the exploitation of renewable resources, modifying the regulatory scheme to support combined heat and power (CHP) and encouraging additional investment in low carbon technologies. Cross-cutting actions, including developing planning procedures that take account of sustainability, marketing campaigns to capture hearts and minds, developing a skills base in low carbon technologies and exploring more radical ways of cutting carbon emissions. (UK)

  20. Leading multi-professional teams in the children's workforce: an action research project.

    Science.gov (United States)

    Stuart, Kaz

    2012-01-01

    The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  1. Strategic Action Plan for ERNWACA - 2007-2011 | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strategic Action Plan for ERNWACA - 2007-2011. IDRC institutional support over the period 2003-2006 (project 102095) enabled the Educational Research Network for West and Central Africa (ERNWACA) to carry out research that made an important contribution to policy dialogue in the region. The work also allowed the ...

  2. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  3. Westinghouse Hanford Company waste minimization actions

    International Nuclear Information System (INIS)

    Greenhalgh, W.O.

    1988-09-01

    Companies that generate hazardous waste materials are now required by national regulations to establish a waste minimization program. Accordingly, in FY88 the Westinghouse Hanford Company formed a waste minimization team organization. The purpose of the team is to assist the company in its efforts to minimize the generation of waste, train personnel on waste minimization techniques, document successful waste minimization effects, track dollar savings realized, and to publicize and administer an employee incentive program. A number of significant actions have been successful, resulting in the savings of materials and dollars. The team itself has been successful in establishing some worthwhile minimization projects. This document briefly describes the waste minimization actions that have been successful to date. 2 refs., 26 figs., 3 tabs

  4. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Science.gov (United States)

    2011-12-27

    ... startup operations. The actions by the Federal agencies, and the laws under which such actions were taken... Assistance and Real Property Acquisition Policies Act of 1970, as amended [42 U.S.C. 61]. 7. Wetlands and...

  5. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  6. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  7. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  8. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  9. Ricœur et la théorie de l’action

    Directory of Open Access Journals (Sweden)

    Jean-Luc Petit

    2014-07-01

    Full Text Available  AbstractRicoeur’s Philosophy of the Will is reexamined here both as a source of motivation for his project of dialoguing with the analytic theory of action and as an explanation for the lack of response on the part of his Anglo-American interlocutors.Keywords: Actions, Language, Body, Idealism. RésuméLa Philosophie de la volonté de Ricœur est revisitée ici comme source de motivation de son entreprise de dialogue avec la théorie analytique de l’action et comme explication du défaut de réponse de ses interlocuteurs anglo-américains.Mots-clés: Actions, Langage, Corps, Idéalisme.

  10. Analysis of the Course of Action in Practices

    Directory of Open Access Journals (Sweden)

    Jacques Fontanille

    2016-07-01

    Full Text Available This is a semiotic essay in which the production of meaning is analyzed during the course of action. As it is an opened course, its nature and projective scope are relevant,whichplacesus inthe actionfieldas language, and also in the syntagmatic settings needed to maintain the congruence. In order to achieve it, the course of action would have to use adaptation, regulation, adjustment, memory and anticipation, etc. For example, there is a typology of traces which leads us from the forms to the interpretative processes, as well as to the concordance or discordance, and to the interpretation rules.

  11. The development of peer reflective supervision amongst nurse educator colleagues: An action research project.

    Science.gov (United States)

    Bulman, C; Forde-Johnson, C; Griffiths, A; Hallworth, S; Kerry, A; Khan, S; Mills, K; Sharp, P

    2016-10-01

    This action research study developed the use of peer reflective supervision (PRS) amongst eight nurse educators contributing to an undergraduate Adult Nursing programme at a UK University. During the academic year (2013-14), nurse educator co-researchers met for an introductory workshop and then met regularly in pairs to facilitate each other's reflection. This provided an opportunity for nurse educators to reflect on identified issues linked to their role with a facilitative peer. Educators met three additional times in a Reflexive Learning Group (RLG), to gather data on their use of PRS. Audio-recordings from the RLGs were transcribed and analysed using Norton's (2009) thematic analysis framework. Co-researchers iteratively validated the data and an external validation group critically viewed the evidence. Overall, seven themes were generated from the three research cycles. These were: PRS as a Valuable Affirming Experience; Time Issues; Facilitation- Support, Trust and Challenge; Developing a Flexible 'Toolbox'; To Write or Not to Write; Drawing on Literature; and Requirement for Action. Findings add new evidence regarding use of a flexible toolbox of resources to develop reflection and offer practical guidance on the development of PRS. Nurse educators often experienced similar concerns, and a facilitative supervision structure allowed co-researchers to positively explore these. Recognition of work pressures and requirement for time and space for reflection was highlighted, particularly regarding writing, and exploring the literature, to develop critical analysis of experiences. The importance of action as part of the reflective process was emphasised. Co-researchers reported positive personal change as well as the opportunity to highlight issues through their reflection for further action within the organisation. The study adds constructive evidence for the use of reflection to explore professional work, make sense of experiences and develop positive action

  12. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  13. Two Project Methods: Preliminary Observations on the Similarities and Differences between William Heard Kilpatrick's Project Method and John Dewey's Problem-Solving Method

    Science.gov (United States)

    Sutinen, Ari

    2013-01-01

    The project method became a famous teaching method when William Heard Kilpatrick published his article "Project Method" in 1918. The key idea in Kilpatrick's project method is to try to explain how pupils learn things when they work in projects toward different common objects. The same idea of pupils learning by work or action in an…

  14. Temporary Residences: a becoming project

    Directory of Open Access Journals (Sweden)

    Luisa Ingaramo

    2012-04-01

    Full Text Available Among the experimental actions fostered so far by the Compagnia di San Paolo through its Housing Program, committed in handling the complex and fragmented housing discomfort issue, the Temporary Dwellings initiative represents a unique and innovative experience, as it actually offers the chance to activate a proper managerial direction around and about the real estate development processes. In particular, the Temporary Dwellings action is marked by two key aspects: a structured co-planning vision and projects selected through a requests for proposal system. The process in the whole aims on the one hand at reaching an high transparent level of decision making , while, on the other hand, at developing a continuous and mutual monitoring and matching activity between the Housing Program and the group of cross-curricular experts teamed up in the project: technicians, designers, managers, psychologists, contractors, and the other local stakeholders.

  15. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    International Nuclear Information System (INIS)

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-01-01

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely

  16. Comparison of doses, before and after remedial action

    International Nuclear Information System (INIS)

    Wallo, A. III

    1988-01-01

    The Division of Facility and Site Decommissioning Projects at DOE-Headquarters is evaluating potential doses from vicinity properties before and after remedial action at several sites using the RESRAD computer code. A preliminary review was completed for nineteen Colonie vicinity properties. This review indicated potential doses before remedial action at these sites ranged from about 43 to 2 mrem/year and after remediation between 5 and 0 mrem/year. These estimates indicate the conservatism in the DOE-derived soil decontamination remedial action. Following remedial action, the potential doses are on the order of those being considered to be below regulatory concern by EPA and NRC. The estimates made for these sites are still conservative due to the method used to determine the source term. More realistic assessments of source terms are anticipate dot significantly affect the after-remedial-action doses, possibly lowering them all to below 1 mrem/year. This evaluation is being refined with more realistic estimates of the source term, for all of the Colonie vicinity properties. Once the Colonie vicinity properties are completed, at least three other sites will be evaluated. It is hoped that this information will provide added confidence in the remedial action guidelines and more general acceptance of the guidelines by the EPA and others

  17. Project Management Information System: the Role and the Issues of Implementation

    Directory of Open Access Journals (Sweden)

    Dumitru OPREA

    2006-01-01

    Full Text Available We are coping more and more with the project and project management in day by day life. Even if some activities are the similarly with common organization actions, the life cycle project activities request more information and more actions. So it is necessary to have some tools, methods and rules to manage a large amount of information which must be disseminated to numerous stakeholders. This need could be solved by project management information systems (PMIS. PMIS is a complex one, with various components which are depending on type of project, type of organization etc. The latest evolution of information and communication technology was favorable to our research field. Therefore, there are different tools to support the structure, automation and efficiency of PMIS. Moreover from several years it is spread the following notions: web-based project management, project management office, enterprise project management. So, we can see the fast evolution of this field. But, our paper will bring general ideas relating to project management information systems, like definition of PMIS, the project life cycle and the information needed of each stage, various tools to support the PMIS procedures. The characteristics, tools, trends will be our future research.

  18. Project Citizen: Promoting Action-Oriented Citizen Science in the Classroom

    Science.gov (United States)

    Green, Carie; Medina-Jerez, William

    2012-01-01

    In recent years, citizen science projects have emerged as a means to involve students in scientific inquiry, particularly in the fields of ecology and environmental science. A citizen scientist is "a volunteer who collects and/or processes data as part of a scientific inquiry" (Silverton 2009, p. 467). Participation in citizen science…

  19. Uranium Mill Tailings Remedial Action 1993 Roadmap

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ''Lack of sufficient human resources,'' remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0

  20. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  1. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  2. A case study for sustainable development action using financial gradients

    International Nuclear Information System (INIS)

    Bose, Arnab; Ramji, Aditya; Singh, Jarnail; Dholakia, Dhairya

    2012-01-01

    Energy access is critical for sustainable development and therefore financing energy access is a necessity. The key is whether to focus on grants or public finance for sustainable development projects or move to a more diffused financing mechanism, involving investment grade financing sources like debt and equity. In other words, financing sustainable development action via grants is becoming a constraint. To address this constraint, it is important to consider the relationship between the nature and sources of financial flows. The concept of ‘financial gradients’ emerged while analysing the financial and business strategy developed for Lighting a Billion Lives (LaBL) campaign. This paper espouses the idea of ‘financial gradients’ which is a potential financial mechanism for sustainable development action. Financial gradients, can contribute in three different ways—first, as an approach to analyse financial flows in projects; second, as a tool to generate a single, long term and stable inflow of finance; third, as a financial mechanism to help in creating long term strategies to sustain projects. This paper will concentrate on financial gradients as a potential approach to analyse financial flows in a sustainable development programme. - Highlights: ► Financial stability is a key challenge for sustainable development programmes. ► Development action via public funds is limited, need for investment grade finance. ► Need to understand financial flows with relation to nature and sources of finance. ► Financial gradients is an innovative tool for ensuring health of programmes.

  3. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    International Nuclear Information System (INIS)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  5. Measuring, Reporting and Verifying Nationally Appropriate Mitigation Actions. Reflecting experiences under the Mitigation Momentum Project. Discussion paper

    Energy Technology Data Exchange (ETDEWEB)

    De Vit, C.; Roeser, F.; Fekete, H.; Hoehne, N.; Wartmann, S.; Van Tilburg, X.; Larkin, J.; Escalante, D.; Haensel, G.; Veum, K.; Cameron, L.; Halcomb, J.

    2013-06-15

    The Mitigation Momentum project aims to support the development of Nationally Appropriate Mitigation Actions (NAMAs). It contributes to the concrete design of NAMA proposals in five countries (Peru, Chile, Indonesia, Tunisia and Kenya). A further aim is to foster cooperation and knowledge exchange within the NAMA community while advancing the international climate policy debate on mitigation and related issues, including approaches for the Measurement, Reporting and Verification (MRV) of NAMAs. MRV enables the assessment of the effectiveness of both internationally supported NAMAs (supported NAMAs) and domestically supported NAMAs (unilateral NAMAs) by tracking NAMA impacts including greenhouse gas (GHG) emission reductions and non-GHG related impacts such as sustainable development benefits. MRV also supports improved policy design and decision making through systematic progress reporting and is a key tool to ensure accountability of NAMA stakeholders. Both host countries and funders share the common interest of having strong, implementable MRV systems in place. From both perspectives, this raises a number of questions, as well as potential challenges, on how to adapt the MRV approach to the specific circumstances of each NAMA. The objective of this paper is to identify open issues for the MRV of impacts of NAMAs, understood here as implementable actions, i.e. a project, a policy, a programme or a strategy. It pays particular attention to NAMAs with a supported component and reflects relevant initial experiences with developing NAMA proposals in the five Mitigation Momentum countries (i.e. using country examples where appropriate). As MRV systems for these NAMAs are still under development or at their preliminary stage, we hope to share further lessons learned in a subsequent discussion paper. Key challenges analysed in this paper include: How to design a MRV system that satisfies both the host country's and funder's expectations while complying with

  6. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  7. De-Escalating the IT-Projects

    Directory of Open Access Journals (Sweden)

    Ghulam Muhammad Kundi

    2007-12-01

    Full Text Available Escalation stickins with an ailing project beyond rational justifications. This happens because in the face of negative feedback, decision makers are strangled between whether to stick with or quit the dying project. Environmental uncertainty has been identified as the root cause of the escalatory behavior. This uncertainty emanates from several sources relating to individual, group, organization and broader environmental factors. This paper argues the premise that effective communication can help create an environment whereby workforce can develop an organized action thereby distributing the responsibility across the whole workforce and not the individuals – leading to the possible reduction of escalatory behavior in IT projects.

  8. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  9. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  10. PROJECT IMPLEMENTATION IN ORGANISATIONS OF REPETITIVE ACTIVITIES

    Directory of Open Access Journals (Sweden)

    Marek WIRKUS

    2015-04-01

    Full Text Available The study presents the implementation of projects in organisations that achieve business objectives through the imple-mentation of repetitive actions. Projects in these organisations are, on the one hand, treated as marginal activities, while the results of these projects have significant impact on the delivery of main processes, e.g. through the introduction of new products. Human capital and solutions in this field bear impact on the success of projects in these organisations, which is not always conducive to smooth implementation of projects. Conflict results from the nature of a project, which is a one-time and temporary process, so organisational solutions are also temporary. It influences on attitudes and com-mitment of the project contractors. The paper identifies and analyses factors which affect the success of the projects.

  11. Thinking Like Researchers: Action Research and Its Impact on Novice Teachers' Thinking

    Science.gov (United States)

    Davis, Janine; Clayton, Courtney; Broome, John

    2018-01-01

    This project investigated the effects of novice teachers' responses to an action research project conducting during the student-teaching semester. This study drew on a framework that considered the participants' process of research, practice of teaching, and identity as a researcher and utilized a qualitative, multiple case-study approach with an…

  12. 78 FR 39829 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...: Title: Reporting of Nonpayroll Withheld Tax Liabilities. OMB Number: 1545-1413. Regulation Project...

  13. Action Research: A Tool for Promoting Faculty Development and Continuous Improvement in Leadership Preparation

    Science.gov (United States)

    Carver, Cynthia L.; Klein, C. Suzanne

    2013-01-01

    This paper introduces the use of action research to examine the content and outcomes of university-based leadership preparation programs. Using examples drawn from an ongoing action research project with candidates in a master's level principal preparation program, we demonstrate how the collection and analysis of candidate's written reflections,…

  14. TWENTY-ONE-YEAR EXTENSION PROJECT PERFORMANCE "LET'S BREASTFEEDING, MOMMY?"

    Directory of Open Access Journals (Sweden)

    Marizete Argolo Teixeira

    2017-05-01

    Full Text Available Research aiming to describe the actions that were developed by the Extension Project "Let's breastfeed, Mom?" During the 21 years of its performance in Jequié / Bahia and identify the difficulties, facilities and progress of the project. This is a descriptive, quantitative-qualitative study. The data were collected in the archived project documents, analyzed through descriptive statistics and content analysis. The results showed that 8,923 registered postpartum women with educational activities and 1,313 domiciliary visits were carried out, as the main actions carried out by the project. The difficulties were: lack of consumer / permanent materials and human resources; As facilities: responsibility and commitment of the members of the project, as well as the support of the transportation service of the institution. The advances were the elaboration of the research project, with insertion of research fellows, creation of the webpage and the logo. It is necessary to reflect on the difficulties and propose measures to remedy them and thus continue to contribute to the promotion, protection and support of breastfeeding in the Municipality, contributing to the reduction of infant morbidity and mortality

  15. The Minnesota Articulation Project and Its Proficiency-Based Assessments.

    Science.gov (United States)

    Chalhoub-Deville, Micheline

    1997-01-01

    Reports on the Minnesota Articulation Project, providing an overview of the projects' three principal working groups: political action, curriculum, and assessment. The article then outlines the theoretical underpinnings of the proficiency-based assessment instruments developed in French, German, and Spanish and describes in detail the content and…

  16. Project radon final report

    International Nuclear Information System (INIS)

    Ekholm, S.; Rossby, U.

    1990-01-01

    The main radiation problem in Sweden is due to radon in dwellings. At the Swedish State Power Board, R, D and D about radon has been going on since 1980. The work has concentrated on the important questions: How to find building with enhanced radon levels?; How to accurately decide on measures that will give adequate cleaning-up results, using appropriate measurement procedures; What cleaning-up effect is possible to achieve with an electro-filter?; and What cleaning-up effects are possible to achieve with different types of ventilation systems? The R, D and D-work, has been pursued in cooperation with universities of technology in Denmark and Finland, equipment manufacturers, consultants and authorities concerned. It was decided in December 1986 to give an offer to some SSPB-employees to investigate the radon situation of their dwellings, in order to test methods of measurement and cleaning-up under realistic conditions and to develop the methods to commercial maturity. The investigation was named 'Project Radon' and was carried out in three years with costs amounting to 1 M dollars. During the project less comprehensive radon measurements, named 'trace-measurements' were undertaken in about 1300 dwellings and more elaborate measurements, leading to suggestions of actions to be taken, in about 400 dwellings. Out of the suggestions, about 50 are carried out including control measurement after actions taken. The control measurement have shown that the ability to suggest appropriate actions is very successful - in just one case was a minor additional action necessary. The high reliability is achieved by always doing elaborate measurements before suggested mitigation method is decided on. (authors)

  17. Using participatory action research to develop an HIV and Aids ...

    African Journals Online (AJOL)

    this participatory action research (PAR) project (Ebersöhn & Ferreira, 2011; ..... giving them information on HIV and Aids” (focus group 2, teacher participant 7). .... under their care and to give them the best possible advice when necessary: “ ...

  18. Learning from Experiences in Action: Music in Schools to Promote Healthy Coping with Grief and Loss

    Science.gov (United States)

    McFerran, Katrina; Hunt, Meagan

    2008-01-01

    This article describes three research projects that utilise a range of research approaches to investigate the benefits of music therapy as support for young people experiencing both bereavement and migration. Two of the research projects utilise formal action research principles in their design, whilst the original project employs a…

  19. Some remarks on the topology of hyperbolic actions of Rn on n-manifolds

    Science.gov (United States)

    Bouloc, Damien

    2017-11-01

    This paper contains some results on the topology of a nondegenerate action of Rn on a compact connected n-manifold M when the action is totally hyperbolic (i.e. its toric degree is zero). We study the R-action generated by a fixed vector of Rn, that provides some results on the number of hyperbolic domains and the number of fixed points of the action. We study with more details the case of the 2-sphere, in particular we investigate some combinatorial properties of the associated 4-valent graph embedded in S2. We also construct hyperbolic actions in dimension 3, on the sphere S3 and on the projective space RP3.

  20. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors