WorldWideScience

Sample records for act operating permit

  1. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  2. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  3. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  4. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  5. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  6. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  7. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  8. 41 CFR 102-74.55 - Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract?

    Science.gov (United States)

    2010-07-01

    ... vending facilities (including vending machines) on Federal property. ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities....55 Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract...

  9. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  10. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2010-04-16

    ... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...

  11. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2012-09-25

    ... Objection to State Operating Permit for Cheyenne Light, Fuel & Power, Wygen II Power Plant AGENCY... to Cheyenne Light, Fuel & Power (CLF&P) for their Wygen II power plant (Wygen II). Pursuant to... final Order, the Petition, and other supporting information. You may view the hard copies Monday through...

  12. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  13. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  14. Effect of zero discharge permits on oil and gas operations

    International Nuclear Information System (INIS)

    Higdon, G.D.

    1994-01-01

    This paper examines one of the more prominent effects of the Clean Water Act (CWA) upon oil and gas operations. To that end, the paper begins with a general discussion of the regulatory background and permitting framework which serves as the foundation for water pollution control. From this discussion, the paper will then move into a discussion of particular permit provisions which govern the discharge of wastes generated from oil and gas operations. Upon discussing these provisions, the paper will then discuss potential enforcement options available to the Environmental Protection Agency (EPA) to address violations of the regulations and permits it has issued to implement the CWA. In that regard, the paper will also discuss some recent enforcement theories advocated by the EPA which may have significant impacts upon oil and gas operators and the way in which they conduct their operations. In light of some of these recent enforcement activities, the paper will close with a discussion of the implications of the theories of liability espoused by EPA and steps which oil and gas operators may taking in response to the positions assumed by EPA

  15. 76 FR 60933 - Antarctic Conservation Act Permit Applications

    Science.gov (United States)

    2011-09-30

    ... NATIONAL SCIENCE FOUNDATION Antarctic Conservation Act Permit Applications AGENCY: National... Conservation Act of 1978. DATES: Interested parties are invited to submit written data, comments, or views with... Regulation for conduct of a flight from South America, over the South Pole, landing at Teniente Marsh Base...

  16. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  17. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 5, contains Appendices E1, H1, I1--3, K1, K2, and L1. These appendices cover a RCRA ground water monitoring waiver, a list of job titles, the operational closure plan, the waste retrieval plan for wastes placed during the test phase, and listings of agreements between WIPP, DOE, and various state and federal agencies. 91 refs., 21 figs., 3 tabs

  18. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  19. FAA's Implementation of the Commercial Space Launch Amendments Act of 2004- The Experimental Permit

    Science.gov (United States)

    Repcheck, J. Randall

    2005-12-01

    A number of entrepreneurs are committed to the goal of developing and operating reusable launch vehicles for private human space travel. In order to promote this emerging industry, and to create a clear legal, regulatory, and safety regime, the United States (U.S.) Congress passed the Commercial Space Launch Amendments Act of 2004 (CSLAA). Signed on December 23, 2004 by U.S. President George W. Bush, the CSLAA makes the Federal Aviation Administration (FAA) responsible for regulating human spaceflight. The CSLAA, among other things, establishes an experimental permit regime for developmental reusable suborbital rockets. This paper describes the FAA's approach in developing guidelines for obtaining and maintaining an experimental permit, and describes the core safety elements of those guidelines.

  20. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 4, contains Appendices C3, C4, and D1--D10. These appendices cover information on environmental impacts, site characterization, geology and hydrology of the area, monitoring of the environment, compatibility of waste forms and containers, and removal of volatile organic compounds (VOC)

  1. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  2. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 3, is Appendix C2 continued. This appendix contains information on shipping; inventories of chemicals present in waste; chemical compatibility of wastes; the methodology to determine compatibility; analytical data regarding volatile organic compounds (VOC), metals, and solvents; and a description of sampling programs of waste drum gases

  3. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 1, contains a site and facility description of WIPP; procedures for waste analysis and characterization, testing, monitoring, inspection, and training; hazard prevention, safety and security plans; plans for closure; and a discussion of other applicable laws. Also included are maps, photographs, and diagrams of the facilities and surrounding areas. 180 refs., 75 figs., 24 tabs

  4. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 2, contains Appendices B1, C1, and C2. These appendices describe the surface hydrology of the area, provide a description of the physical and chemical characteristics of wastes to be placed in WIPP, and outline a waste analysis plan which gives an overview of the total waste inventory planned for WIPP. 34 refs., 107 figs., 27 tabs

  5. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received...

  6. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-06-29

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received...

  7. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  8. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  9. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  10. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  11. 76 FR 17434 - Receipt of Application for an Endangered Species Act Incidental Take Permit

    Science.gov (United States)

    2011-03-29

    ... Atmospheric Administration RIN 0648-XA020 Receipt of Application for an Endangered Species Act Incidental Take..., the Services) for incidental take permits (ITPs) under the Endangered Species Act of 1973, as amended...) and implementing regulations prohibit the taking of animal species listed as endangered or threatened...

  12. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Science.gov (United States)

    2010-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  13. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  14. Relationship Between the Part 70 Operating Permit Program and Section 112(r)

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Hanford Facility resource conservation and recovery act permit general inspection plan

    International Nuclear Information System (INIS)

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  16. 75 FR 34983 - Order (1) Pursuant to Section 4(c) of the Commodity Exchange Act, Permitting the Kansas City...

    Science.gov (United States)

    2010-06-21

    ... Act, Permitting the Kansas City Board of Trade Clearing Corporation To Clear Over-the-Counter Wheat Calendar Swaps and (2) Pursuant to Section 4d of the Commodity Exchange Act, Permitting Customer Positions... contract market, and its wholly- owned subsidiary corporation, the Kansas City Board of Trade Clearing...

  17. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  18. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  19. 77 FR 62537 - Notice of Waste Management Permit Application Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-10-15

    ... NATIONAL SCIENCE FOUNDATION Notice of Waste Management Permit Application Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of a Waste Management... the National Science Foundation (NSF) has received a waste management permit application for Mike...

  20. Resource Conservation and Recovery Act permit modifications and the functional equivalency demonstration: a case study

    International Nuclear Information System (INIS)

    Elsberry, K.; Garcia, P.; Carnes, R.; Kinker, J.; Loehr, C.; Lyon, W.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ''functionally equivalent.'' The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers' specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times

  1. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  2. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  3. Process for evaluation of renewal of the operating permit for Garona NPP

    International Nuclear Information System (INIS)

    Zarzuela Jimenez, J.

    2009-01-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CSN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  4. 78 FR 60321 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-10-01

    ..., Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system... effort to monitor the spatial scale of human impacts in Antarctica. Samples taken near Palmer Station...

  5. 78 FR 41960 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-07-12

    ..., Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system... waste (food waste, human solid waste, and packaging materials). Human waste and grey water would be...

  6. 76 FR 57765 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2011-09-16

    ..., Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system... Island (ASPA 121) and Cape Crozier (ASPA 124) to collect ground control with highly precise GPS equipment...

  7. Tennessee Valley Authority, Paradise Fossil Plant; Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  8. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  9. Pacific Custom Materials, Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. 75 FR 62891 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-10-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  11. 76 FR 52354 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2011-08-22

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  12. 77 FR 56237 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-09-12

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  13. 75 FR 61520 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-10-05

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  14. 75 FR 60830 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-10-01

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  15. 76 FR 58049 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2011-09-19

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  16. 75 FR 75501 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-12-03

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  17. 75 FR 25300 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-05-07

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  18. 77 FR 31044 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-05-24

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received Under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  19. 75 FR 6222 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-02-08

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received Under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  20. 76 FR 58843 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2011-09-22

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  1. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  2. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy's contractors are identified as ''co-operators'' and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ''operator'' elsewhere in the application is not meant to conflict with the contractors' designation as co-operators but rather is based on the contractors' contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  3. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  4. 78 FR 54685 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-05

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  5. 78 FR 52218 - Notice of permit applications received under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-08-22

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of permit applications received under the Antarctic... applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  6. 78 FR 56247 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-12

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  7. 78 FR 1759 - Notice of Approval of Clean Air Act Outer Continental Shelf Minor Source/Title V Minor Permit...

    Science.gov (United States)

    2013-01-09

    ... documents relevant to the above-referenced permits are available for public inspection during normal... permit decisions, to the extent it is available, may be sought by filing a petition for review in the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR PART 52 [FRL-9767-5] Notice of Approval of Clean Air Act...

  8. Wisconsin Public Service, Weston Generating Station; Petition to Object to Issuance of Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  9. Tennessee Valley Authority, Paradise Fossil Plant; Order Responding Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  10. Application of the Coasting Trade Act to offshore oil and gas operations

    International Nuclear Information System (INIS)

    De Jonge, B.B.

    2002-01-01

    The main features of the 1992 Coasting Trade Act are summarized. The main purpose of the Act is to protect Canadian ship owners and to ensure they have an opportunity to recover their investments in having Canadian built and crewed vessels. The Coasting Trade Act replaces provisions of the Canada Shipping Act which prohibited non-British ships from entering into Canadian domestic trade. The intention for the Coasting Trade Act is to reserve the coasting trade of Canada to Canadian-registered ships. However, when a Canadian ship is not available, a suitable foreign ship may be temporarily permitted to engage in the Canadian coasting trade as long as Canadian safety standards are met and duties are paid. The Canada Customs and Revenue Agency deals with licence applications while the Canadian Transportation Agency deals with unfair practices and enforcement. The provisions relating to the Coasting Trade License applications are examined along with how they are administered with particular reference to offshore oil and gas operations. The paper also presents recent decisions regarding application licences for Tycom (US) Inc., the Norwegian Polar Ship Management, and the Cyprus-registered seismic vessel, the Northern Access. It is noted that in evaluating the suitability and availability of a Canadian vessel for an activity proposed to be performed by a foreign vessel, the Canadian Transportation Agency examines the technical, financial and commercial elements brought by the parties

  11. Petition for the Administrator to Obect to TVA's Shawnee Fossil Plant's Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Order Denying Petition to Object to Operating Permit for TVA's Shawnee Fossil Plant

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. 77 FR 37445 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-06-21

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... directed by the Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science... feathers removed to confirm gender of the penguin, and have GPS/TDR tags attached and later removed. The...

  14. 75 FR 34434 - Request To Amend an Existing Order Under Section 4(c) of the Commodity Exchange Act Permitting...

    Science.gov (United States)

    2010-06-17

    ...) pursuant to Section 4(c) of the Act, (a) to permit the clearing of coffee, sugar, and cocoa OTC swap..., ``a * * * commodity swap,'' which latter term includes swaps on agricultural products. While the...(c) of the Act, ICE Clear could not engage in the clearing of OTC swap contracts in cocoa, sugar and...

  15. Title V Operating Permit: QEP Field Services Company - Wonsits Valley Compressor Station

    Science.gov (United States)

    Response to public comments and the Title V Operating Permit for the QEP Field Services Company, Wonsits Valley Compressor Station, located on the Uintah and Ouray Indian Reservation in Uintah County, Utah.

  16. Title V Operating Permit: QEP Field Services Company - Coyote Wash Compressor Station

    Science.gov (United States)

    Response to public comments and the Title V Operating Permit for the QEP Field Services Company, Coyote Wash Compressor Station, located on the Uintah and Ouray Indian Reservation in Uintah County, Utah.

  17. Petition to Object to the Carmeuse Lime and Stone Plant, Manitowoc, Wisconsin, Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. 77 FR 37445 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-06-21

    ..., Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system... additional seals takes into account the loss of tags and incomplete datasets from irretrievable equipment...

  19. 75 FR 65035 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-10-21

    ..., Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system... organic pollutants (POPs) stored in glacier ice into the Antarctica marine food web, and (b) provide...

  20. INEL RCRA [Resource Conservation and Recovery Act] permit for incineration of hazardous waste: Status report

    International Nuclear Information System (INIS)

    McFee, J.N.; Dalton, J.D.; Bohrer, H.A.

    1987-01-01

    The Waste Experimental Reduction Facility (WERF) was constructed to reduce the volume of low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). To address the problem of radioactively contaminated ignitable hazardous waste resulting from INEL activities, a development program was carried out to evaluate WERF's ability to meet the regulated criteria for incinerating liquid and solid ignitable waste. Concurrently, INEL submitted its hazardous waste Part B application under the Resource Conservation and Recovery Act (RCRA). As required, and as a major step in the permitting process, the WERF incinerator portion of the permit application included a proposed trial burn, which is a demonstration test of the incinerator's ability to destroy hazardous materials. The trial burn plan was designed to demonstrate the system performance for liquid and solid ignitable wastes at three operating conditions, using a prepared mix of materials representative of waste to be processed. EPA Region X reviewed and commented on the plan prior to the trial burn. Results of the liquid feed trial burn showed a greater than 97% probability of meeting the RCRA-dictated DRE value for chlorinated solvents and a greater than 99% probability for nonchlorinated solvents. Nonchlorinated solid waste results were calculated at a 93% probability of meeting the required DRE, with a 75% probability for chlorinated solid wastes. In addition, the incinerator DRE continued to improve long after the assumed pre-test equilibrium period had ended. The trial burn demonstrates that the WERF incinerator can safely and adequately destroy ignitable hazardous and mixed waste and provides a significant enhancement of the INEL's waste management system

  1. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  2. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  3. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  4. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  5. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  6. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  7. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  8. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  9. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  10. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  11. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  12. 78 FR 3920 - Notice of Permit Applications Received; Under the Antarctic Conservation Act of 1978 (Pub. L. 95...

    Science.gov (United States)

    2013-01-17

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... explore for, discover, and collect vertebrate fossils (primarily those of fishes, marine reptiles, non... be shed on the evolution, faunal dynamics, and/or paleobiogeography of such important vertebrate...

  13. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  14. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  15. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  17. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  18. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  4. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  5. Public Service Company, Fort St. Vrain Station, Petition For Objection to Issuance of Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Honeywell Engines, Systems and Services, Phoenix, Arizona, Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. June 30, 2003 Petition for the Administrator to Object to Chemical Lime Company's Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Salt River Project San Tan Generating Station, Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Petition to Object to the TVA Paradise Fossil Plant, Drakesboro, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Petition to Object to the Xcel Energy, Hayden Station, Hayden Colorado, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. 78 FR 73893 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-12-09

    .... 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed... on September 18, 2013 . The issued permit allows the applicant to conduct waste management activities associated with tourism activities including shore [[Page 73894

  12. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  13. 76 FR 10894 - Notice of Issuance of Prevention of Significant Deterioration and Federal Operating Permits to...

    Science.gov (United States)

    2011-02-28

    ... Deterioration and Federal Operating Permits to Grand Casino Hinckley AGENCY: Environmental Protection Agency... Corporate Commission doing business as Grand Casino Hinckley. This permit authorizes Grand Casino Hinckley... owned by Mille Lacs Band Corporate Commission doing business as Grand Casino Hinckley. EPA received an...

  14. Hanford Central Waste Complex: Radioactive mixed waste storage facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy Field Office, Richland. The Hanford Site manages and produces dangerous waste and mixed waste (containing both radioactive and dangerous components). The dangerous waste is regulated in accordance with the Resource Conversation and Recovery Act of 1976 and the State of Washington Hazardous Waste Management Act of 1976. The radioactive component of mixed waste is interpreted by the US Department of Energy to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous component of mixed waste is interpreted to be regulated under the Resource Conservation and Recovery Act of 1976 and Washington Administrative Code 173--303. Westinghouse Hanford Company is a major contractor to the US Department of Energy Field Office, Richland and serves as co-operator of the Hanford Central Waste Complex. The Hanford Central Waste Complex is an existing and planned series of treatment, storage, and/or disposal units that will centralize the management of solid waste operations at a single location on the Hanford facility. The Hanford Central Waste Complex units include the Radioactive Mixed Waste Storage Facility, the unit addressed by this permit application, and the Waste Receiving and Processing Facility. The Waste Receiving and Processing Facility is covered in a separate permit application submittal

  15. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  17. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  20. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  1. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  2. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  3. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  4. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  5. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  7. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Science.gov (United States)

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  8. Atomic Energy Authority Act 1971

    International Nuclear Information System (INIS)

    1971-01-01

    This Act provides for the transfer of property, rights, liabilities and obligations of parts of the undertaking of the United Kingdom Atomic Energy Autority, to two new Compagnies set up for this purpose: the Bristish Nuclear Fuels Limited, and the Radiochemical Centre Limited. Patents licences and registered designs owned by the Autority at the time of the transfer are not included therein. The Act also includes amendments to the Nuclear Installations Act 1965, notably as regards permits to operate granted to a body corporate. Finally, the Schedule to this Act lays down a certain number of provisions relating to security and the preservation of secrets. (NEA) [fr

  9. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  10. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  11. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  12. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  13. Nuclear installations operated without the required permits: the policy pursued in the Netherlands

    International Nuclear Information System (INIS)

    Huygen, A.

    1994-01-01

    The authoress presents two topical cases from the Netherlands where two nuclear installations are allowed to continue operation by a joint decision of the government and the courts, although the legal operating permits have been declared void by a government senate. The legal basis constructed for this approach allowing plant operation to continue for a limited number of years is an explicit statement by the government to tolerate such procedure. The installations are the Bodeward nuclear power station with a BWR and the Almelo URENCO uranium enrichment facility. (orig./HSCH) [de

  14. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  15. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  16. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  17. Order Responding to October 5, 2000 Petition for the Administrator to Object to Elmhurst Hospital's Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. April 1, 2003 Petition Requesting the Administrator Object to Operating Permit for Eastman Kodak in Rochester, NY

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. 77 FR 67055 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-11-08

    ... of State (DOS) has received from NOVA Chemicals Inc. (``NOVA Inc.'') notice that by way of corporate... Presidential Permit issued to Polysar. NOVA Inc. requests a new Presidential Permit be issued under its name.... anticipates no change in the operations of Lines 16, 18 and 19 relative to those that were authorized by the...

  20. New Clean Air Act complicates power plant operation, design

    International Nuclear Information System (INIS)

    Smock, R.W.

    1991-01-01

    In November the president signed into law the new Clean Air Act, ushering in a new era in the power generation industry. This paper reviews the six important sections of the Clean Air Act and their impact on power plant operation and design

  1. 'Blocked area' of a citizens' action group in operating plan permit accoding to Mining Law

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-26

    On the question as to whether a citizen's action group, organized in the form of a registered club, has the right to file suit as defined by paragraph 2 of sect. 42 of the rules of administrative courts, in case they bring forward that their right to the reforestation of an estate, ensured by easement, will be affected by a skeleton operating plan permit issued under the mining law. Since the protection of the recreational function of forests is a task the safeguarding of which is solely assigned to bodies of public administration, anyone who has a real right may not claim neighbourly protection under public law in so far. On the relationship between operating plan approval, procedures are according to mining laws and the licensing procedures concerning construction permits.

  2. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  3. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  4. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  5. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  6. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1993-01-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change

  7. February 18, 2005 Order Responding to Reqest to Object to Operating Permit for Eastman Kodak in Rochester, NY

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Honeywell Engines, Systems and Services, Phoenix, Arizona, Dec. 10, 2007 Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Petition Requesting that the Administrator Object to the Issuance of Title V Operating Permit to Madison-Kipp Corp.

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Response to the Petition to Object to the TVA Paradise Fossil Plant, Drakesboro, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Pacer Corporation, White Bear Mica Plant near Custer, South Dakota Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. GCC Dacotah Cement Manufacturing, Order Partially Granting and Partially Denying Petition for Objection to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  14. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  15. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  16. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  17. Guidance to regulations on trade with emission permits for carbon dioxide; Vaegledning till lagstiftning om handel med utslaeppsraetter foer koldioxid

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-15

    This guidance is intended to facilitate application of the rules on emissions trading. The guidance is principally concerned with issues relating to permit appraisal and monitoring, but also discusses some terms common to permits and allocations, such as installation and operator. The guidance follows the same structure as the Swedish Environmental Protection Agency regulations (NFS 2007:5) in order to provide direct support for the rules. The focus is on providing a general description of the responsibilities of the operator and application of the rules. In addition, some difficult terms and relationships are explained. However, no exhaustive description of the operator's responsibilities is given, nor are the rules on verification described. We therefore recommend that the guidance should be read in conjunction with the Trading Act, the Trading Ordinance and the Swedish Environmental Protection Agency regulations. The first chapter presents a brief description of the purpose of the trading scheme, and is followed by a chapter in which the rules on applying for permits and the application procedure are reviewed. The next chapter gives a description of how the operator should monitor emissions and how the rules for the monitoring plan work, as well as the options that exist for simplified monitoring. The next chapter looks at notifications the operator might have to make and what they should contain. Guidance is also provided on how the county administrative board should process these notifications. The conditions of the permit decision are also briefly described. This is followed by a short chapter on the emissions report and the materiality threshold. The final chapter comments on certain parts of the annexes to the regulations. The EU Emissions Trading Directive has been implemented in Sweden through the Emissions Trading Act (2004:1199) (the Trading Act), the Emissions Trading Ordinance (2004:1205), the Swedish Environmental Protection Agency regulations

  18. 685. Order amending the Order concerning the definition of goods whose export requires a permit in accordance with the Security Control Act

    International Nuclear Information System (INIS)

    1990-01-01

    The list of goods which may not be exported without a permit, in accordance with the Act of 1972 on security control, was amended by this Order. The amendment includes numerous items or equipment involving radiation or radioactive materials. It came into effect on 1 December 1990. (NEA)

  19. Wisconsin Public Service - Weston Generating Station; Order Denying in Part and Granting in Part a Petition for Objection to the Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  20. 49 CFR 231.22 - Operation of track motor cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  1. 76 FR 80960 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2011-12-27

    ..., Kansas, Nebraska, and South Dakota, for the purpose of enhancing the species' survival. Permit... certain activities with endangered or threatened species. The Endangered Species Act of 1973, as amended (Act), prohibits activities with endangered and threatened species unless a Federal permit allows such...

  2. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  3. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  4. Order Granting and Denying in Part the Petition for Objection to the Xcel Energy, Hayden Station Operating Permit, Hayden Colorado

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Petition to Object to the Eastern Kentucky Power Coop. William C. Dale Power Station, Ford, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  7. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  8. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  9. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  10. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  11. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  12. 76 FR 74070 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2011-11-30

    ... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: November 21, 2011. Lynn M. Lewis...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  13. 78 FR 9415 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-02-08

    ...). Authority: The authority for this notice is the Endangered Species Act of 1973, as amended (16 U.S.C. 1531...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  14. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  15. EPA's Review of Concentrated Animal Feeding Operation (CAFO) Permits and Nutrient Management Plans in the Chesapeake Bay Watershed

    Science.gov (United States)

    Starting in 2013, EPA conducted reviews of Concentrated Animal Feeding Operations (CAFOs) permits and nutrient management plans (NMPs) in six of the Bay jurisdictions (Delaware, Maryland, New York, Pennsylvania, Virginia and West Virginia).

  16. February 18, 2005 Order Responding to Petition for the Administrator to Object to Operating Permit for Eastman Kodak in Rochester, NY

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Petition to the EPA Administrator to Object to the Puerto Rico Electric Power Authority Central San Juan Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  19. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  20. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  1. 77 FR 25129 - Environmental Impact Statement for Issuance of a Special Use Permit for the Continued Operation...

    Science.gov (United States)

    2012-04-27

    ... Use Permit for the Continued Operation of the Winchester Canyon Gun Club; Los Padres National Forest... environmental impact statement (EIS). SUMMARY: The USDA, Forest Service, Los Padres National Forest, gives...: Send written comments to: Los Padres National Forest, 6755 Hollister Avenue, Suite 150, Goleta, CA...

  2. Determination on Whether Specialty Minerals Inc. Must be Included in the Simpson Paper Company Shasta Mill Application for a Title V Operating Permit as a Support Facility.

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Science.gov (United States)

    2010-08-06

    ... Presidential Permit No. PP-22, as amended, to BC Hydro. The application requested that the Department of Energy... the transmission of electric energy between the United States and a foreign country is prohibited in... law pursuant to British Columbia's Clean Energy Act. Since restructuring of the electric power...

  4. 78 FR 19602 - Approval and Promulgation of Implementation Plans and Operating Permits Program; State of Missouri

    Science.gov (United States)

    2013-04-02

    ... compounds which are excluded from the definition of Volatile Organic Compound (VOC) in 10 CSR 10-6.020(v... adversely affect the stringency of the SIP or the operating permits program. Next, definitions in 40 CSR 10... state has incorporated the EPA method subpart references in 10 CSR 10-6.020 Definitions and Common...

  5. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    ... issued an endangered species permit to address emergency veterinary care for an injured green sea turtle...] Emergency Issuance of Endangered Species Permit AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered and threatened species under section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended...

  6. RCRA permitting strategies for the development of innovative technologies: Lessons from Hanford

    International Nuclear Information System (INIS)

    Gajewski, S.W.; Donaghue, J.F.

    1994-01-01

    The Hanford Site restoration is the largest waste cleanup operation in history. The Hanford plutonium production mission generated two-thirds of all the nuclear waste, by volume, in the Department of Energy (DOE) Complex. Cleanup challenges include not only large stored volumes of radioactive, hazardous, and mixed waste, but contaminated soil and groundwater and scores of major structures slated for decontamination, decommissioning, and demolition. DOE and its contractors will need to invent the technology required to do the job on a timetable driven by negotiated milestones, public concerns, and budgetary constraints. This paper will discuss the effort at Hanford to develop an integrated, streamlined strategy for compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in the conduct of research, development, and demonstration (RD ampersand D) of innovative cleanup technologies. The aspects that will be discussed include the following: the genesis of the RD ampersand D permitting challenge at Hanford; permitting options in the existing regulatory framework; regulatory options that offered the best fit for Hanford RD ampersand D activities, and the problems associated with them; and conclusions and recommendations made to regulatory bodies

  7. Licensing of nuclear facilities according to the Bulgarian Act on the Safe Use of Nuclear Energy

    International Nuclear Information System (INIS)

    Stoyanova-Todorova, P.

    2004-01-01

    The new Bulgarian Act on the Safe Use of Nuclear Energy /Nuclear Act/ has replaced the former Act on the Use of Nuclear Energy for Peaceful Purposes. The new Nuclear Act covers the activities involving nuclear energy and sources of ionising radiation mainly by establishing a consistent licensing regime. About 13 regulations specifying the provisions of the Nuclear Act have been recently adopted by the Council of Ministers, the most important one being the Regulation on the Procedure for Issue of Licenses and Permits for the Safe Use of Nuclear Energy. The Chairman of the Nuclear Regulatory Agency (NRA) is authorised by the law to consider any application for issue of a license or a permit under the Bulgarian Nuclear Act. The procedure starts with an application, filed with the NRA, and continues about nine months. The final decision could be for issuing of the license or permit or a refusal for issuing the claimed document. The denial must be grounded and is subject to appeal. The Nuclear Act prescribes the conditions for issuing of two types of licensing documents (authorisations): licenses and permits. From a legal point of view the two types of licensing documents have one and the same nature - they are individual administrative acts according to the Bulgarian law. That is why there is no difference between them in terms of the issuing procedure. The difference between licenses and permits could be explained as follows: while a license is issued for reiterated activities, a permit is issued for non-reoccurring activities, this division being a specific feature of the Bulgarian Nuclear Act. In the field of nuclear facilities usage only one type of license is provided for by the Nuclear Act - a license for operation of a nuclear facility unit. For the rest of the activities issuing of permits is envisaged, those permits being in compliance with the main stages of the authorisation process formulated by the IAEA, following the step-by-step approach - siting, design

  8. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  9. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    International Nuclear Information System (INIS)

    2010-01-01

    for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd 3 ) (157,437 cubic feet (ft 3 )). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd 3 (756,999 ft 3 ) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd 3 (0.9 million ft 3 ). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls (PCBs)) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with

  10. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  11. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  12. 19 CFR 12.7 - Permits required for importation.

    Science.gov (United States)

    2010-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  13. The French Space Operation Act: Technical Regulations

    Science.gov (United States)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  14. Process for evaluation of renewal of the operating permit for Garona NPP.; Proceso para la evaluacion de la renovacion de la autorizacion de explotacion de Garona

    Energy Technology Data Exchange (ETDEWEB)

    Zarzuela Jimenez, J.

    2009-07-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  15. Order Denying the Petition to Object to the Eastern Kentucky Power Coop. William C. Dale Power Station, Ford, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-27

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Foundation (NSF) is required to publish a notice of permit applications received to conduct activities...

  17. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  18. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  19. Lessons from Queensland's last-drinks legislation: The use of extended trading permits.

    Science.gov (United States)

    Zahnow, Renee; Miller, Peter; Coomber, Kerri; de Andrade, Dominique; Ferris, Jason

    2018-05-01

    The association between alcohol availability, alcohol consumption and, in turn, alcohol-related harms is well established. Policies to reduce alcohol-related harms focus on limiting accessibility through the regulation of the liquor industry, including trading hours. On 1 July 2016, the Queensland Government introduced legislation to reduce ordinary liquor trading hours, replacing 5 am closing times with 3 am cessation of liquor sales in designated entertainment precincts and 2 am cessation of sales across the rest of the state. However, the amendment was under-inclusive and did not apply to temporary extended trading permits, a provision of the Liquor Act 1992 allowing one-off variations in trading hours for special events. We use 24 months of data (1 January 2015 to 31 December 2016) from the Office of Liquor Gaming and Regulation to explore patterns of extended trading permit use across Queensland, pre- and post- 1 July 2016. We find that following the Amendment in 2016 there was also a distinct shift in the utilisation of temporary extended trading permits, with a 63% increase in approved permits between 2015 and 2016. Temporal clustering around key calendar events dissipated following 1 July 2016 with consistent concentration of permit utilisation over consecutive weeks. Using temporary extended trading permits venue owners avoided earlier closing times and continued to operate until 5 am. The findings provide lessons for future policy implementation by illustrating the capacity for under-inclusive legislation to result in the dilution of intended effects. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  20. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  1. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  2. 78 FR 72080 - Draft NPDES General Permit Modification for Discharges From the Oil and Gas Extraction Point...

    Science.gov (United States)

    2013-12-02

    ...). ACTION: Notice; Proposal of NPDES general permit modification. SUMMARY: EPA Region 6 today proposes... determine whether your facility, company, business, organization, etc. is regulated by this action, you..., Paperwork Reduction Act, and Regulatory Flexibility Act. The scope of Today's permit modification action...

  3. Auctioning emission permits in a leader-follower setting

    OpenAIRE

    Alvarez, Francisco; André, Francisco J.

    2015-01-01

    We analise emission permit auctions under leader-follower competition when the leader bids strategically and the follower acts as price-taker both at the auction and the secondary market. We obtain linear equilibrium bidding strategies for both firms and a unique equilibrium of the auction, which is optimal ex-post for the leader. Under specific distributional assumptions we conclude that the auction always awards less permits to the leader than the cost-effective amount. Our central result i...

  4. 75 FR 53689 - Issuance of an Experimental Use Permit

    Science.gov (United States)

    2010-09-01

    ... INFORMATION CONTACT: Gina Casciano, Biopesticides and Pollution Prevention Division (7511P), Office of..., Experimental use permits. Dated: August 19, 2010. W. Michael McDavit, Acting Director, Biopesticides and...

  5. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  6. 75 FR 29584 - Notice of Lodging of Consent Decree Under the Resource Conservation and Recovery Act

    Science.gov (United States)

    2010-05-26

    ..., to obtain a permit under the Resource Conservation and Recovery Act (``RCRA'') for its ownership and... emissions from the TMW at the facility; perform trial and risk burns for the TMW to identify appropriate incinerator level and risk based operating and control parameters for the unit; file a notification and...

  7. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  8. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  9. Section 404 of the Clean Water Act

    Science.gov (United States)

    Information about the Clean Water Act permitting program for dredge or fill material into waters of the US, including roles, 401 certification of permits, state/tribal assumption of 404 program, mitigation requirements, regulations

  10. 30 CFR 910.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Georgia Water Quality Control Act, section 17-501; the Georgia Solid Waste Management Act, section 43-1681.... 910.773 Section 910.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA...

  11. 30 CFR 922.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Waste Management Act of 1978, MCL section 299.401; Michigan Water Resources Commission Act, MCL section.... 922.773 Section 922.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN...

  12. 30 CFR 921.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21.... 921.773 Section 921.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE...

  13. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  14. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  15. 76 FR 10361 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2011-02-24

    .../anadarko_response2010.pdf . FOR FURTHER INFORMATION CONTACT: Donald Law, Office of Partnerships and..., 2010 response to the Administrator's October 8, 2009 Order arguing it failed to appropriately assess...

  16. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  17. Impact of the safe drinking water act on energy development. Final issue paper

    International Nuclear Information System (INIS)

    Guymont, F.J.; Shore, R.; Goldberg, M.

    1977-11-01

    Energy development activities will be impacted by the Underground Injection Control Regulations that are formulated under Part C of the Safe Drinking Water Act. The thrust of Part C of the Act is to protect groundwater that now is or in the future might be used for drinking water. A new draft of the regulations, on which this analysis is based, is currently being considered. These regulations will be either another set of proposed regulations or will be interim final which means they can be enforced immediately but EPA will still entertain comments on them and modify them if necessary. There are four possible situations in which the Underground Control Regulations would not apply. They are: If the aquifer in question can be left unprotected despite the fact that its solids level is less than 10,000 mg/1; if the aquifer is oil or mineral producing; if the aquifer is located at a depth that would made recovery of drinking water uneconomical; and if the aquifer is already contaminated. However, the individual states have to demonstrate this to the satisfaction of the EPA administrator. If none of the conditions holds, construction, monitoring operating and reporting requirements will be necessary to receive a permit. The economic impact of these requirements is uncertain but could involve significant economic and time expenditures. Permits do not have to be renewed and one permit can serve for a whole field of wells. However, the permit application requires a significant amount of information and will take a considerable amount of time and expense to fill out. Solution mining operations also will incur extra expenses establishing initial water quality profiles and maintaining monitoring wells

  18. Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon

    Science.gov (United States)

    2018-05-01

    This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...

  19. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  20. 40 CFR 122.33 - If I am an operator of a regulated small MS4, how do I apply for an NPDES permit and when do I...

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Application and Special NPDES Program... 40 Protection of Environment 21 2010-07-01 2010-07-01 false If I am an operator of a regulated...

  1. 77 FR 67407 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-11-09

    ... designation of certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. The applications received... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  2. The Clean Air Act Amendments of 1990 - Implementation

    International Nuclear Information System (INIS)

    Radford, N.D. Jr.

    1991-01-01

    On November 15, 1991 the Clean Air Act Amendments of 1990 were signed into law. The Amendments include eleven titles. They are: Title I specifies the requirements for attainment and maintenance of the national ambient air quality standards; Title II provides for more stringent motor vehicle emission limits and cleaner vehicle fuels; Title III addresses the release of air toxics; Title IV creates an acid deposition control program; Title V imposes a new comprehensive operating permit system for stationary sources; Title VI provides for stratospheric ozone protection; Title VII imposes increased civil and criminal penalties and liability; Title VIII contains miscellaneous provisions. Title IX provides for air quality research projects; Title X directs the EPA to make ten percent of research funds available to disadvantaged businesses; and Title XI amends the Job Training Partnership Act

  3. Understanding the impact of the Smoke-Free Ontario Act on hospitality establishments' outdoor environments: a survey of restaurants and bars.

    Science.gov (United States)

    Kennedy, Ryan David; Elton-Marshall, Tara; Mutti, Seema; Dubray, Jolene; Fong, Geoffrey T

    2010-04-01

    The Smoke-Free Ontario Act (SFOA) came into effect in May 2006 and included restrictions to outdoor hospitality areas by only permitting smoking on a patio if the area had no roof. (1) To assess the impact of the SFOA on the prevalence of smoke-free patios in Ontario and (2) to determine the proportion of venues where structural alterations were made rather than going smoke-free in order to achieve compliance with the SFOA. A telephone survey of 403 hospitality sector operators/owners in four clustered samples of Ontario, Canada. Based on completed surveys, the SFOA resulted in an increase in prevalence of smoke-free patios, from 5% (n=21) to 25% (n=99). Of the patios where smoking was permitted before the SFOA (n=382), 42% (n=161) had physical structures that would make smoking not permissible under the new act. Operators of half of these venues (n=80) made their patios smoke-free, with most indicating they had no choice given the costs or physical limitations to changing their outdoor environment. The other half (n=81) reported making physical changes, including removing roof structures to achieve compliance. The SFOA resulted in greater protection from outdoor secondhand smoke; however, most patios still permitted smoking. Half of the venues that complied with the SFOA by going smoke-free did so involuntarily because of structural and/or financial limitations. The majority of venue operators preferred to permit smoking on their patios, and only made their patios smoke-free when they were required to do so by law.

  4. 30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.

    Science.gov (United States)

    2010-07-01

    ... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...

  5. H.R.3052: This Act may be cited as the Coal Field Water Protection and Replacement Act, introduced in the US House of Representatives, One Hundred Second Congress, First Session, July 25, 1991

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This bill would amend the Surface Mining Control and Reclamation Act of 1977 to provide for the protection of water resources during coal mining operations. Sections of the bill describe probable hydrologic consequences; surface and ground water monitoring plan; performance bonds; protection of water resources for permit approval; effect of underground coal mining operations; inspection and monitoring; penalty for failure of representative of Secretary or state regulatory authority to carry out certain duties; release of performance bond; water rights and replacement; regulations; and state programs

  6. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  7. Are LMFBR permits unconstitutional. [German Feferal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, H; Ziegler, E

    1977-12-01

    The August 18, 1977 decision by the Muenster Higher Administrative Court to have the Federal Constitutional Court investigate the constitutionality of permits granted for fast breeder power plants has aroused much attention, both in the FRG and in other countries. This is the first time that the German Atomic Energy Act is being questioned with respect to the separation of powers between legislative and executive authorities and also with respect to the principle of a constitutional state. As a result of their analysis of the first information available about the court decision the authors have some doubts as to whether the views held by the court about the consequences of the development of fast breeder reactors and of the permit granted for the SNR 300 demonstration nuclear power station are essentially correct. In view of the wording of and the official comments on the incriminated Section 7 of the Atomic Energy Act and the large number of subsequent leading decisions by the Federal Diet about fast breeder reactors also the concern about the constitutionality of that reactor line appears to be unfounded.

  8. Incorporation of Startup, Shutdown, and Malfunction Plans into Source's Title V Permits

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. July 2011 Memorandum: Improving EPA Review of Appalachian Surface Coal Mining Operations Under the Clean Water Act, National Environmental Policy Act, and the Environmental Justice Executive Order

    Science.gov (United States)

    Memorandum: Improving EPA Review of Appalachian Surface Coal Mining Operations Under the Clean Water Act, National Environmental Policy Act, and the Environmental Justice Executive Order, July 21, 2011

  10. Order Responding to November 18, 2002 Petitoner's Request that the Administrator Object to the TVA John Sevier Fossil Plant and the TVA Kingston Fossil Plant Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  12. The European Union's potential for strategic emissions trading through permit sales contracts

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Hagem, Cathrine

    2011-01-01

    Strategic market behavior by permit sellers will harm the European Union (EU) as it is expected to become a large net buyer of permits in a follow-up agreement to the Kyoto Protocol. In this paper, we explore how the EU could benefit from making permit trade agreements with non-EU countries. These trade agreements involve permit sales requirement, complemented by a financial transfer from the EU to the other contract party. Such agreements would enable the EU to act strategically in the permit market on behalf of its member states, although each member state is assumed to behave as a price taker in the permit market. Using a stylized numerical simulation model, we show that an appropriately designed permit trade agreement between the EU and China could significantly cut the EU's total compliance cost. This result is robust for a wide range of parameterizations of the simulation model. (author)

  13. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  14. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  15. Seeley-Gilkey coefficients for fourth-order operators on Riemannian manifold

    International Nuclear Information System (INIS)

    Gusynin, V.P.

    1990-01-01

    The covariant pseudodifferential-operator method of Widom is developed for computing the coefficients in the heat kernel expansion. It allows one to calculate Seeley-Gilkey coefficients for both minimal and nonminimal differential operators acting on a vector bundle over a riemannian manifold. The coefficients for the fourth-order minimal operators in arbitrary dimensions of space are calculated. In contrast to the second-order operators the coefficients for the fourth-order (and higher) operators turn out to be essentially dependent on the space dimension. The algorithmic character of the method allows one to calculate the coefficients by computer using an analytical calculation system. The method also permits a simple generalization to manifolds with torsion and supermanifolds. (orig.)

  16. Order Responding to a Request that the Administrator Object to the Issuance of an Operating Permit to Albert Einstein College of Medicine of Yeshiva University in Bronx, NY

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. H.R. 3184: The Act may be cited as the Department of Energy Minority Economic Impact Revitalization Act. Introduced in the House of Representatives, One Hundredth Congress, First Session, August 4, 1989

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    H.R. 3184 is a bill to establish within the Office of Minority Economics Impact of the Department of Energy (DOE) programs involving loans and grants to enhance the development and operation of minority business enterprises with respect to energy-related business, to amend the Nuclear Waste Policy Act of 1982 to permit the investment of certain funds in the Minority Bank Deposit Program of the Department of the Treasury, and for other purposes

  18. 76 FR 4683 - Pesticide Experimental Use Permit; Receipt of Application; Comment Request

    Science.gov (United States)

    2011-01-26

    ... telephone number is (703) 305-5805. FOR FURTHER INFORMATION CONTACT: Mike Mendelsohn, Biopesticides and... permits. Dated: January 12, 2011. Keith A. Matthews, Acting Director, Biopesticides and Pollution...

  19. Periodic Monitoring in Title V Permits for Turbines Subject to NSPS Subpart GG

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 22 CFR 161.10 - Non-Federal applicants for permits.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-Federal applicants for permits. 161.10 Section 161.10 Foreign Relations DEPARTMENT OF STATE ENVIRONMENTAL PROTECTION REGULATIONS FOR IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Coordination of Other Requirements of NEPA § 161...

  1. 25 CFR 700.33 - Act (The Act).

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Act (The Act). 700.33 Section 700.33 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.33 Act (The Act). (a) The Act. The Act is Pub. L. 93-531, (88 Stat...

  2. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  3. 40 CFR 60.3069 - Am I required to apply for and obtain a title V operating permit for my air curtain incinerator...

    Science.gov (United States)

    2010-07-01

    ... title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and... and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard...

  4. S. 1626: This Act may be cited as the Mickey Leland Minority Economic Impact Revitalization Act. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, September 14, 1989

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    S. 1626 is a bill to establish within the Office of Minority Economic Impact of the Department of Energy (DOE) programs involving loans and grants to enhance the development and operation of minority business enterprises with respect to energy-related business, to amend the Nuclear Waste Policy Act of 1982 to permit the investment of certain funds in the Minority Bank Deposit Program of the Department of the Treasury, and for other purposes

  5. 40 CFR 70.8 - Permit review by EPA and affected States.

    Science.gov (United States)

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements... PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.8 Permit review by EPA and affected States. (a...

  6. 49 CFR 385.337 - What happens if a new entrant refuses to permit a safety audit to be performed on its operations?

    Science.gov (United States)

    2010-10-01

    ... safety audit to be performed on its operations? 385.337 Section 385.337 Transportation Other Regulations... TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS SAFETY FITNESS PROCEDURES New Entrant Safety Assurance Program § 385.337 What happens if a new entrant refuses to permit a safety audit to be performed on its...

  7. 77 FR 123 - Final Reissuance of General NPDES Permits (GP) for Facilities Related to Oil and Gas Extraction

    Science.gov (United States)

    2012-01-03

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  8. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  9. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  10. Operational experience with double acting piston pumps for cryogenic helium and nitrogen

    International Nuclear Information System (INIS)

    Vosswinkel, F.

    1978-01-01

    The design of a high efficiency double acting piston pump suitable for pumping liquefied gases at cryogenic temperatures for cable cooling, is reported. The pump has proved flexible, reliable and efficient in operation. The plunger-type pumps can be used for filling cryostats or dewars with liquid helium or nitrogen from a pressure free or pressurized storage vessel, or as circulators for subcooled, saturated and/or supercritical helium in large scale cooling experiments. Flow rates of up to 17 g/s, maximum operating pressure of 600 kPa absolute and maximum differential pressure of approximately 100 kPa are obtained. (UK)

  11. 77 FR 36273 - Public Meeting on Draft Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using...

    Science.gov (United States)

    2012-06-18

    ... duration and well closure; area of review; information submitted with the permit application; and... Fracturing Activities Using Diesel Fuels--Draft: Underground Injection Control Program Guidance 84.'' The... permits under the Safe Drinking Water Act to ensure protection of underground sources of drinking water...

  12. Petition to Object to the Williams Four Corners, LLC - Sims Mesa Central Delivery Point natural gas processing plant and compressor station, Rio Arriba County, New Mexico, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  14. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  15. 77 FR 5506 - ORPC Maine, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-02-03

    ... preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Treat Island Tidal Energy Project to be located in Passamaquoddy Bay, between the Town of Eastport and Treat Island, Washington County, Maine. The sole purpose of a preliminary permit, if issued...

  16. HANDBOOK: GUIDANCE ON SETTING PERMIT CONDITIONS AND REPORTING TRIAL BURN RESULTS

    Science.gov (United States)

    This Handbook provides guidance for establishing operational conditions for incinerators. he document provides a means for state and local agencies to achieve a level of consistency in setting permit conditions that will result in establishment of more uniform permit conditions n...

  17. A sorting system with automated gates permits individual operant experiments with mice from a social home cage.

    Science.gov (United States)

    Winter, York; Schaefers, Andrea T U

    2011-03-30

    Behavioral experiments based on operant procedures can be time-consuming for small amounts of data. While individual testing and handling of animals can influence attention, emotion, and behavior, and interfere with experimental outcome, many operant protocols require individual testing. We developed an RFID-technology- and transponder-based sorting system that allows removing the human factor for longer-term experiments. Identity detectors and automated gates route mice individually from their social home cage to an adjacent operant compartment with 24/7 operation. CD1-mice learnt quickly to individually pass through the sorting system. At no time did more than a single mouse enter the operant compartment. After 3 days of adjusting to the sorting system, groups of 4 mice completed about 50 experimental trials per day in the operant compartment without experimenter intervention. The automated sorting system eliminates handling, isolation, and disturbance of the animals, eliminates experimenter-induced variability, saves experimenter time, and is financially economical. It makes possible a new approach for high-throughput experimentation, and is a viable tool for increasing quality and efficiency of many behavioral and neurobiological investigations. It can connect a social home cage, through individual sorting automation, to diverse setups including classical operant chambers, mazes, or arenas with video-based behavior classification. Such highly automated systems will permit efficient high-throughput screening even for transgenic animals with only subtle neurological or psychiatric symptoms where elaborate or longer-term protocols are required for behavioral diagnosis. Copyright © 2011 Elsevier B.V. All rights reserved.

  18. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Science.gov (United States)

    2011-07-20

    ... have a choice of health plans to fit their needs. Exchanges will give individuals and small businesses... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... implement the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the...

  19. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  20. 77 FR 74507 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-12-14

    ... not operate to the disadvantage of the endangered species, and (3) the granted permit would be.... Zoological Park. 2012. 82880A Big Game Studio 77 FR 54604; September 5, October 17, 2012. 2012. 83520A Donald...; fax (703) 358-2280. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  1. Act N0 68-1045 of 29 November 1968 amending Act N0 65-956 of 12 November 1965 on the third party liability of operators of nuclear ships

    International Nuclear Information System (INIS)

    1968-01-01

    This Act amends the 1965 Act, in particular by specifying that the maximum amount of liability of the operator of a foreign nuclear ship is that fixed by the legislation of the State concerned, unless otherwise agreed with that State, but may in no case be lower than that set out in the 1965 Act, namely 500 million French francs. (NEA) [fr

  2. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  3. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  4. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  5. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  6. 1984 Act on nuclear activities (1984:3)

    International Nuclear Information System (INIS)

    1984-01-01

    This 1984 Act on Nuclear Activities (1984:3) replaces the 1956 Atomic Energy Act as well as the 1977 Act on special permits to charge nuclear reactors with nuclear fuel and the 1980 Act on Public Insight into the Safety Work at Nuclear Power Plants. Like the 1956 Act, the 1984 Act in a safety legislation, which is based on a system of licensing conditions and supervision. According to the fundamental provisions of the 1984 Act, nuclear activities should be conducted in such a way as to meet safety requirements and fulfil the obligations that follow from Sweden's international agreements for the purpose of preventing the proliferation of nuclear weapons. (NEA) [fr

  7. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  8. The Air Force Air Program and Information Management System (APIMS): A flexible tool for managing your Title V Operating Permits

    Energy Technology Data Exchange (ETDEWEB)

    Weston, A.A.; Gordon, S.R.

    1999-07-01

    The Air Force Command Core System (CCS) is an integrated, activity-based risk management system designed to support the information needs of Environment, Safety, and Occupational Health (ESOH) professionals. These professionals are responsible for managing a complex and often dynamic set of requirements, and therefore, have a need for an information system that can readily be customized to meet their specific needs. This dynamic environment also drives the need for flexibility in the system. The Air Program Information Management System (APIMS) is a module within CCS designed to not only manage permit compliance and emission inventories, but also support the monitoring, recordkeeping, and reporting requirements related to air quality issues. This paper will describe the underlying foundation of CCS, the information linkages within the database, and then summarize the functionality available within the APIMS module to support the Air Quality Managers' information needs, placing emphasis on the flexibility the system provides to manage Title V Operating Permits.

  9. An examination of the Hazardous Materials Transportation Uniform Safety Act (HMTUSA): A southern perspective

    International Nuclear Information System (INIS)

    1992-03-01

    On November 16,1990, President Bush signed into law the most comprehensive amendments to the Hazardous Materials Transportation Act (HMTA) in 15 years. The Hazardous Materials Transportation Uniform Safety Act of 1990 (HMTUSA) was created by Congress in an effort to strengthen and clarify the HMTA. This paper will discuss the act's provisions as they affect shipments of spent fuel and high-level radioactive materials as well as the impact of those provisions on routing and emergency response issues in the southern region. HMTUSA consists of seven key provisions that affect radioactive materials: clarification of regulatory jurisdiction; highway routing standards; broadened industry registration; safety permits for motor carriers of high risk materials; expanded nuclear transportation requirements; new provisions for emergency response training and planning; and a public process for assessing the feasibility of a federally operated central reporting system and data center. In addition to amending various HMTA provisions, the new HMTUSA act provides appropriations to carry out the specific goals of the legislation. The act authorizes appropriations for the 1991, 1992 and 1993 fiscal years

  10. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  11. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  12. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  13. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility

  14. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  15. Government Performance and Results Act Reporting on Defense Working Capital Funds Net Operating Results

    National Research Council Canada - National Science Library

    2001-01-01

    .... The overall objective of the audit was to determine whether the net operating results for the activity groups of the Defense Working Capital Fund were consistently and accurately compiled. We also assessed internal controls to determine whether management complied with the Government Performance and Results Act of 1993.

  16. Order Granting the Petition to Object to Williams Four Corners, LLC - Sims Mesa Central Delivery Point natural gas processing plant and compressor station, Rio Arriba County, New Mexico, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. 78 FR 17661 - Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the...

    Science.gov (United States)

    2013-03-22

    ...., whichever is earlier. Hearing statements may be provided orally or in written format. Commenters providing... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  18. 78 FR 70042 - Proposed Issuance of the NPDES General Permit for Oil and Gas Geotechnical Surveying and Related...

    Science.gov (United States)

    2013-11-22

    ... be provided orally or in written format. Commenters providing verbal comments are encouraged to... Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts from... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  19. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  20. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  1. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  2. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  3. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  4. 12 CFR 563.146 - Will the OTS permit my capital distribution?

    Science.gov (United States)

    2010-01-01

    ... under 12 U.S.C. 1831o(d)(1)(B). (b) Your proposed capital distribution raises safety or soundness... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Will the OTS permit my capital distribution... SAVINGS ASSOCIATIONS-OPERATIONS Capital Distributions § 563.146 Will the OTS permit my capital...

  5. 75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC

    Science.gov (United States)

    2010-11-16

    ... Utilities, 107 Selden Street, Berlin, CT 06037 AND Mary Anne Sullivan, Hogan Lovells, LLP, 555 13th St., NW., Washington, DC 20004. Before a Presidential permit may be issued or amended, DOE must determine that the... impacts of the proposed project pursuant to the National Environmental Policy Act of 1969, determines the...

  6. 75 FR 29991 - Marine Mammals; receipt of application for permit amendment

    Science.gov (United States)

    2010-05-28

    ...; phone (978)281-9300; fax (978)281-9333; and Southeast Region, NMFS, 263 13th Avenue South, Saint... delphinids such as long-finned pilot whales (Globicephala melas), although other small cetacean species may... expiration date of the permit. In compliance with the National Environmental Policy Act of 1969 (42 U.S.C...

  7. 76 FR 61670 - Receipt of an Application for Incidental Take Permit (16230)

    Science.gov (United States)

    2011-10-05

    ... application includes endangered Kemp's ridley, leatherback, and hawksbill sea turtles and threatened green and... Division of Marine Fisheries (NCDMF) pursuant to the Endangered Species Act of 1973, as amended (ESA). As... take of endangered or threatened species. The permit application is for the incidental take of ESA...

  8. 77 FR 65864 - Receipt of an Application for Incidental Take Permit (16230)

    Science.gov (United States)

    2012-10-31

    .... This application includes endangered Kemp's ridley, leatherback, and hawksbill sea turtles and... Fisheries (NCDMF) pursuant to the Endangered Species Act of 1973, as amended (ESA). As required by the ESA... endangered or threatened species. The permit application is for the incidental take of ESA-listed adult and...

  9. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Science.gov (United States)

    2012-02-15

    ... determined that reissuance of this general permit is not likely to adversely affect Essential Fish Habitat... that issuance of the permit has no adverse effect to Essential Fish Habitat. Coastal Zone Management... initiated section 7 consultations in accordance with the Endangered Species Act with the U.S. Fish and...

  10. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    Energy Technology Data Exchange (ETDEWEB)

    Bhatt, Arpit H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Yi Min [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-01

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

  11. PERMIT PROCEDURE OF ESTHABLISMENT AND SUPERVISION OF NURSING CLINIC IN BANTUL REGENCY

    Directory of Open Access Journals (Sweden)

    Nasrullah Nasrullah

    2012-12-01

    Full Text Available As one of the health professions, nurse normally does no have independent authority to conduct medical practice. However, according to several regulations, nurse has a chance to establish and run his/her own nursing clinic. So far, there are six individual nursing clinics have been operated in Bantul Regency. By utilizing empirical research method with legislation approach, this research aims at finding out the importance and the permit procedure to establish nursing clinic as well as to know the supervision means used by the government upon the operated nursing clinic in Bantul Regency. This research proved that nursing clinics have given beneficial advantages on the society as whole. Meanwhile, to operate a nursing clinic a nurse has to be granted a Nursing Practice Permit Letter (Surat Izin Praktik Perawat/SIPP from the government. Finally, the nursing clinic is supervised by the Health Bureau by means of supervision and control program.Keywords: nursing practice, nursing clinic, Nursing Practice Permit Letter, supervision and control program

  12. Permitting of Landfill Bioreactor Operations: Ten Years after the RD&D Rule

    Science.gov (United States)

    Prior to promulgation of the Rule, there were approximately 20 full-scale bioreactor projects in North America, including one in Canada. Of these, six were permitted by EPA (four Project XL sites and two projects listed separately under a cooperative research agreement at the Ou...

  13. AQUIS: A PC-based air quality and permit information system

    International Nuclear Information System (INIS)

    Smith, A.E.; Huber, C.C.; Tschanz, J.; Ryckman, J.S. Jr.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans

  14. The French Space Operation Act: Scope and Main Features. Introduction to the Technical Regulation Considerations about the Implementation in the Launcher Field

    Science.gov (United States)

    Cahuzac, Francois

    2010-09-01

    This publication provides a presentation of the new French Space Operation Act(hereafter FSOA). The main objectives of FSOA are to institute a clarified legal regime for launch operations. The technical regulation associated to the act is set forth, in particular for the safety of persons and property, the protection of public health and the environment. First, we give an overview of the institutional and legal framework implemented in accordance with the act. The general purpose of this French Space Operation Act(hereafter FSOA) is to set up a coherent national regime of authorization and control of Space operations under the French jurisdiction or for which the French Government bears international liability either under UN Treaties principles(namely the 1967 Outer Space Treaty, the 1972 Liability Convention and the 1976 Registration Convention) or in accordance with its European commitments with the ESA organization and its Members States. For a given space operation, the operator must show that systems and procedures that he intends to implement are compliant with the technical regulation. The regime of authorization leads to a request of authorization for each launch operation. Thus, licences concerning operator management organization or a given space system can be obtained. These licences help to simplify the authorization file required for a given space operation. The technical regulation is presented in another article, and will be issued in 2010 by the French Minister in charge of space activities. A brief description of the organization associated to the implementation of the authorization regime in the launcher field is presented.

  15. 77 FR 4060 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-01-26

    ... Biology, University of Alabama, Birmingham, AL 35294-1170. Activity for Which Permit Is Requested Take and... marine algae, 30 green marine algae, 10 red marine algae, and 10 diatom marine algae to sublimate...

  16. MEDICAL ENTITIES –FINANCING TYPES AND SOURCES IN LIGHT OF THE ACT ON MEDICAL ACTIVITY

    Directory of Open Access Journals (Sweden)

    Małgorzata Paszkowska

    2014-04-01

    Full Text Available Defining legally permitted financing sources is fundamental for each medical entity. The act on medical activity of 15th April 2011introduced many changes for medical service suppliers also as concerns the permitted financing sources. This paper aims to present the types of medical entities and their financing sources in the light of the new regulations, i.e. the act on medical activity.

  17. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  18. 78 FR 58568 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-24

    ... certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. Application Details 1. Applicant... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  19. 78 FR 53789 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-08-30

    ... certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. Application Details 1. Applicant... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  20. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  1. Hanford facility dangerous waste permit application, low-level burial grounds

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20)

  2. Hanford facility dangerous waste permit application, low-level burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  3. 77 FR 53236 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-08-31

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... facilities that may be present, verify that the reasons for special protection remain valid, verify that the... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  4. Design study of shaft face seal with self-acting lift augmentation. 5: Performance in simulated gas turbine engine operation

    Science.gov (United States)

    Ludwig, L. P.; Johnson, R. L.

    1971-01-01

    The feasibility and the noncontact operation of the self-acting seal was demonstrated over a range of simulated gas turbine engine conditions from 200 to 500 ft/sec sliding speed. Sealed pressure differentials were 50 to 300 psi and sealed temperatures were 150 to 1200 F. Low leakage (about 1/10 that of conventional labyrinth seals) was exhibited in two endurance runs (200 and 338 hr) at 400 ft/sec, 200 psi and 1000 F (gas temperature). For these endurance runs, the self-acting pad wear was less than 3.8 micrometers (0.00015 in.); this low wear was attributed to the noncontact operation of the primary seal. Operating problems identified were fretting wear of the secondary seal and erosion of the primary seal by hard particles.

  5. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  6. Petition to Object to the GCC Dacotah Portland Cement Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. 75 FR 45675 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-08-03

    .... Applicant: Sam Feola, Director, Raytheon Polar Services Company, 7400 South Tucson Way, Centennial, CO 80112..., Raytheon Polar Services Company, 7400 South Tucson Way, Centennial, CO 80112. Activity for Which Permit is... Way, Centennial, CO 80112. Activity for Which Permit is Requested: Enter Antarctic Specially Protected...

  8. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    Science.gov (United States)

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  9. Review of the nuclear liability act

    International Nuclear Information System (INIS)

    1990-01-01

    There has always been concern that nuclear materials have the potential to cause injury and property damage. For this reason, nuclear operators have always been required by national regulatory authorities to exercise special precautions in the operation of their facilities. Federal legislation was drafted in Canada as the Nuclear Liability Act in 1970. The Act ensures that funds are available from all operators of nuclear facilities to provide financial compensation to third parties for injuries or damages suffered as a result of a nuclear incident; at the same time the Act provides protection to the operators by limiting their related liability. The Act also protects persons other than operators. The review of the Act has progressed in stages. The first stage was conducted by the staff of the Atomic Energy Control Board and catalogued previously identified difficulties with the Act. The second stage was a preliminary examination of the Act by an Interdepartmental Working Group. 2 figs

  10. 32 CFR 767.12 - References for submission of permit application to conduct archeological research.

    Science.gov (United States)

    2010-07-01

    ... preservation planning process with guidelines on implementation. (c) Archeological Resources Protection Act of... of Historic Properties, 36 CFR part 800. These regulations govern the Section 106 Review Process.... These regulations establish basic government-wide standards for the issuance of permits for...

  11. Act No. 430 of 7 June 1978 amending Sections 4 and 5

    International Nuclear Information System (INIS)

    1978-01-01

    Act No. 430 amends Sections 4 and 5 of the Atomic Energy Act of 25/10/57. Under Section 4 as amended, a permit issued by virtue of the Atomic Energy Act may now be granted for specified reasons for a stated period of time. The possibility of granting permits for a period is considered important in the light of the uncertainties relating to nuclear waste management. Such permits may be renewed permanently provided the reasons for their periodic validity have ceased to exist. Amended Section 5 lays down the manner in which the responsibility for nuclear waste has been divided between the waste producer and the State. The waste producer has overall responsibility for the expenses caused by nuclear waste management. The State may, however, take over the nuclear waste, provided that the conditions approved by the Council of State have been fulfilled and provision for payment of expenses arising from the treatment and disposal of such waste has been made in a satisfactory manner. (NEA) [fr

  12. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  13. 7 CFR 57.905 - Importation of restricted eggs or eggs containing more restricted eggs than permitted in the...

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Importation of restricted eggs or eggs containing more restricted eggs than permitted in the official standards for U.S. Consumer Grade B. 57.905 Section 57.905... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG...

  14. 30 CFR 843.13 - Suspension or revocation of permits: Pattern of violations.

    Science.gov (United States)

    2010-07-01

    ... order to a permittee requiring him or her to show cause why his or her permit and right to mine under... the circumstances, including: (i) The number of violations, cited on more than one occasion, of the... number of violations, cited on more than one occasion, of different requirements of the Act, this chapter...

  15. 40 CFR 266.102 - Permit standards for burners.

    Science.gov (United States)

    2010-07-01

    ... or industrial furnace downstream of the combustion zone and prior to release of stack gases to the... MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.102 Permit standards for burners. (a) Applicability—(1) General. Owners and operators of boilers and industrial furnaces...

  16. 78 FR 13101 - No FEAR Act Notice; Notice of Rights and Protections Available Under Federal Antidiscrimination...

    Science.gov (United States)

    2013-02-26

    ... No. 1] No FEAR Act Notice; Notice of Rights and Protections Available Under Federal... FEAR Act. The Act requires that federal agencies provide notice to their employees, former employees.... 1214(f). Nothing in the No FEAR Act alters existing laws or permits an agency to take unfounded...

  17. 76 FR 12745 - Privacy Act of 1974; Department of Homeland Security Office of Operations Coordination and...

    Science.gov (United States)

    2011-03-08

    ... 20528. For privacy issues please contact: Mary Ellen Callahan (703-235-0780), Chief Privacy Officer... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary [Docket No. DHS-2010-0055] Privacy Act of... Operations Center Tracker and Senior Watch Officer Logs System of Records AGENCY: Privacy Office, DHS. ACTION...

  18. 76 FR 22444 - Privacy Act; System of Records: State-52, Parking Permit and Car Pool Records

    Science.gov (United States)

    2011-04-21

    ...; bureau; office telephone number and e-mail address; and type of parking permit and desired [[Page 22445... authentication and time out function. All Department of State employees and contractors with authorized access...

  19. 49 CFR 40.281 - Who is qualified to act as a SAP?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Who is qualified to act as a SAP? 40.281 Section... § 40.281 Who is qualified to act as a SAP? To be permitted to act as a SAP in the DOT drug and alcohol.... (2) You must be knowledgeable about the SAP function as it relates to employer interests in safety...

  20. The Balanced Budget Act of 1997 and U.S. hospital operations.

    Science.gov (United States)

    Bazzoli, Gloria J; Lindrooth, Richard C; Hasnain-Wynia, Romana; Needleman, Jack

    The Balanced Budget Act (BBA) of 1997 initiated several changes to Medicare payment policy in an effort to slow the growth of hospital Medicare payments and ensure the future of the Medicare Hospital Insurance Trust Fund. Although subsequent federal legislation relaxed some original proposals, restored funds were limited and directed to specific types of hospitals. In addition, these Medicare policy changes came at a time when hospitals faced private sector payment constraints. This paper assesses the short-term effects of the BBA on operations of nonprofit hospitals in the United States and compares these effects to those observed in the early 1980s during implementation of the Medicare prospective payment system (PPS). We found that some operational changes instituted by hospitals facing financial pressures from the BBA were similar to those observed for hospitals that faced pressure from Medicare PPS, including efforts to contain Medicare cost growth, to expand outpatient service provision, and to contain hospital staffing. However, during PPS implementation hospitals experienced declining inpatient use and growing profit margins, whereas post-BBA hospitals experienced growing inpatient use and declining margins.

  1. 77 FR 41809 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-07-16

    ..., Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity..., Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity for Which Permit Is.... Applicant: Celia Lang, Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO...

  2. 33 CFR 221.1 - Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4).

    Science.gov (United States)

    2010-07-01

    ... Permits for Activities in Navigable Waters or Ocean Waters. 2 33 CFR 209.120 was removed at 42 FR 37133... Federal Water Pollution Control Act (see paragraph (i)(2)) of this section. Such a permit is subject to a...) Responsibilities under section 404 of the Federal Water Pollution Control Act as amended in 1972 (33 U.S.C. 1151...

  3. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  4. 78 FR 41959 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-07-12

    ... Areas (ASPA) or involving Antarctic Flora and Fauna. Starting in 2013, all new permits issued for ASPA entry or involving Antarctic Flora and Flora require the permittee to submit an annual report to the... Specially Protected Areas (ASPA) or involving Antarctic Flora and Fauna issued prior to 2013 that require...

  5. 24 CFR 146.1 - Purpose of the Age Discrimination Act of 1975.

    Science.gov (United States)

    2010-04-01

    ... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General § 146.1 Purpose of the Age Discrimination Act of... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of the Age Discrimination... programs or activities receiving Federal financial assistance. The Act, however, permits federally assisted...

  6. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  7. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  8. 75 FR 23671 - Endangered and Threatened Species; Take of Anadromous Fish; Research Permit Applications

    Science.gov (United States)

    2010-05-04

    ... and Threatened Species; Take of Anadromous Fish; Research Permit Applications AGENCY: National Marine... listed under the Endangered Species Act (ESA) and to help guide management and conservation efforts. The... capture, handle, and release juvenile fish from all the species covered by this notice. They would also...

  9. 77 FR 4288 - Arbitration Panel Decision Under the Randolph-Sheppard Act

    Science.gov (United States)

    2012-01-27

    ... February 5, 2009, permit application to operate vending machines at the Southern Oregon Rehabilitation... Blind for a permit to operate the Clinic vending machines.'' Arbitration Panel Decision After reviewing... vending machines are part and parcel of that facility. The panel noted that the parties' differing...

  10. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Science.gov (United States)

    2012-05-01

    ...) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction dredges (intake nozzle... ENVIRONMENTAL PROTECTION AGENCY [FRL-9666-1] Proposed Issuance of a General NPDES Permit for Small... certifies ``will not, if promulgated, have a significant economic impact on a substantial number of small...

  11. 25 CFR 166.100 - What special tribal policies will we apply to permitting on Indian agricultural lands?

    Science.gov (United States)

    2010-04-01

    ... preferences in permits advertised for bid under § 166.221 of this part, by allowing prospective Indian operators to match the highest responsible bid (unless the tribal law or leasing policy specifies some other... THE INTERIOR LAND AND WATER GRAZING PERMITS Tribal Policies and Laws Pertaining to Permits § 166.100...

  12. Application of the French Space Operation Act and the Development of Space Activities in the Field of Launchers

    Science.gov (United States)

    Cahuzac, F.; Biard, A.

    2012-01-01

    The development of space activities has led France to define a new legal framework: French Space Operation Act (FSOA). The aim of this act, is to define the conditions according to which the French government authorizes and checks the spatial operations under its jurisdiction or its international responsibility as State of launch, according to the international treaties of the UN on space, in particular the Treaty (1967) on Principles Governing the Activities of States in the Exploration and Use of Outer Space, the Convention ( 1972 ) on International Liability for Damage Caused by Space Objects, and the Convention (1975) on Registration of Objects Launched into Outer Space. The main European space centre is the Guiana Space Centre (CSG), settled in France. A clarification of the French legal framework was compulsory to allow the arrival of new launchers (Soyuz and Vega). This act defines the competent authority, the procedure of authorization and licenses, the regime for operations led from foreign countries, the control of spatial objects, the enabling of inspectors, the delegation of monitoring to CNES, the procedure for urgent measures necessary for the safety, the registration of spatial objects. In this framework, the operator is fully responsible of the operation that he leads. He is subjected to a regime of authorization and to governmental technical monitoring delegated to CNES. In case of litigation, the operator gets the State guarantee above a certain level of damage to third party. The introduction of FSOA has led to issue a Technical Regulation set forth, in particular for the safety of persons and property, the protection of public health and the environment. This general regulation is completed by a specific regulation applicable to CSG that covers the preparation phase of the launch, and all specificities of the launch range, as regards the beginning of the launch. The Technical Regulation is based on 30 years of Ariane's activities and on the

  13. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    International Nuclear Information System (INIS)

    2010-01-01

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  14. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  15. National Environmental Policy Act guidance: A model process

    International Nuclear Information System (INIS)

    Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.

    1995-04-01

    The ''Model National Environmental Policy Act (NEPA) Process'' includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions

  16. Appendix: The Dream Act of 2009--111th Congress, 1st Session, S.729

    Science.gov (United States)

    New Directions for Student Services, 2010

    2010-01-01

    This article describes the Development, Relief, and Educational for Alien Minors Act of 2009 or the "DREAM Act of 2009." The authors of the bill aim to amend the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 to permit States to determine State residency for higher education purposes and to authorize the cancellation…

  17. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  18. A study for Unsafe Act classification under crew interaction during procedure-driven operation

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jinkyun; Kim, Yochan; Kim, Seunghwan; Jung, Wondea

    2016-01-01

    Highlights: • The procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. • Ten patterns of UA occurrence paths and the related operators per path were identified. • The UA type classification scheme was proposed based on the ten patterns of UA occurrence paths. • A case study to implement the UA type classification and to define the related operators per UA was performed. • The UA type classification scheme can be practical in that it prevents bias by subjective judgment. - Abstract: In this study, a method for UA (Unsafe Act) classification under a simulated procedure driven operation was proposed. To this end, a procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. Based on the four stages of a procedure driven operation, ten patterns of UA occurrence paths and the related operators per path were identified. From the ten types of UA occurrence paths including related operators, it is practicable to trace when and by whom a UA is initiated during a procedure driven operation, and the interaction or causality among the crew after the UA is initiated. Therefore, the types of UAs were classified into ‘Instruction UA’, ‘Reporting UA’, and ‘Execution UA’ by considering the initiation time and initiator of UA. A case study to implement the UA type classification and to define the related operators per UA was performed with the ISLOCA scenario simulator training data. The UA classification scheme proposed in this paper can be practical in that it does not require expertise relatively in a human performance analysis and it prevents bias by subjective judgment because it is based on an observation-based approach to exclude subjective judgment.

  19. 78 FR 44557 - Turnagain Arm Tidal Energy Corporation; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2013-07-24

    ... Tidal Energy Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, the Turnagain Arm Tidal... Federal Power Act (FPA), proposing to study the feasibility of the Turnagain Arm Tidal Electric Generation...

  20. 75 FR 8735 - Endangered and Threatened Wildlife and Plants; Permit, San Luis Obispo County, CA

    Science.gov (United States)

    2010-02-25

    ...] Endangered and Threatened Wildlife and Plants; Permit, San Luis Obispo County, CA AGENCY: Fish and Wildlife... Luis Obispo County, California. We invite comments from the public on the application, which includes a... Luis Obispo County, California, that will meet Americans with Disabilities Act (ADA) accessibility...

  1. Marginal overweight operating scenario for DOE's initiative I highway casks

    International Nuclear Information System (INIS)

    Hill, C.V.; Loud, G.C.; Heitzman, A.C.

    1993-01-01

    This paper assesses the potential transport of high-capacity Initiative I highway casks under development by the Office of Civilian Radioactive Waste Management (OCRWM) as permitted marginal overweight shipments that: exceed a gross vehicle weight (gvw) limit of 80,000, but weight less than 96,000 pounds; follow axle and axle group weight limits adopted by the Surface Transportation Assistance Act (STAA) of 1982; conform to dimensional restrictions to operate on most major highways; and comply with the Federal Bridge Formula. The marginal overweight tractor-trailer would operate in normal open-quotes over-the-roadclose quotes mode and comply with all laws and regulations. The vehicle would have a sleeper berth and two drivers - one to drive while the other provides escort and communications services and accumulates required off-duty time

  2. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  3. Petition to have the Administrator Object to Weyerhaeuser - Barnesville Wood Products Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. Kinesthetic coupling between operator and remote manipulator

    Science.gov (United States)

    Bejczy, A. K.; Salisbury, J. K., Jr.

    1980-01-01

    A universal force-reflecting hand controller has been developed which allows the establishment of a kinesthetic coupling between the operator and a remote manipulator. The six-degree-of-freedom controller was designed to generate forces and torques on its three positional and three rotational axes in order to permit the operator to accurately feel the forces encountered by the manipulator and be as transparent to operate as possible. The universal controller has been used in an application involving a six-degree-of-freedom mechanical arm equipped with a six-dimensional force-torque sensor at its base. In this application, the hand controller acts as a position control input device to the arm, while forces and torques sensed at the base of the mechanical hand back drive the hand controller. The positional control relation and the back driving of the controller according to inputs experienced by the force-torque sensor are established through complex mathematical transformations performed by a minicomputer. The hand controller is intended as a development tool for investigating force-reflecting master-slave manipulator control technology.

  5. 78 FR 277 - Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for...

    Science.gov (United States)

    2013-01-03

    ..., Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for..., FRL-9764-8] Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for Concentrated Animal Feeding Operations (CAFOs); Extension of Comment Period AGENCY...

  6. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  7. Nuclear Non-proliferation (Safeguards) Act 1987 - No 8 of 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This Act aims at giving domestic legislative effect to Australia's international non-proliferation obligations and establishes controls over the possession and transport of nuclear materials and equipment by a system of permits. These obligations arise inter alia under the NPT Convention on the Physical Protection of Nuclear Material. The Act provides that its provisions shall apply to nuclear material (as defined in Article XX of the IAEA Statute) and associated items which include associated material, equipment or technology. These are clearly defined in the Act. (NEA) [fr

  8. Aligning oversize/overweight permit fees with agency costs : critical issues.

    Science.gov (United States)

    2013-08-01

    This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options : due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structur...

  9. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  10. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  11. 78 FR 11575 - Privacy Act of 1974; Implementation

    Science.gov (United States)

    2013-02-19

    ... subject to exemption under these subsections. Finally, the commenter alleged that the Department failed to... potential acts of terrorism. Revealing this information may also permit the subject individual to take... addition, because many of these records come from courts and other state and local criminal justice...

  12. Consideration of Fugitives in Open-Air Cattle Operations

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. Vessel Operator System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Operator cards are required for any operator of a charter/party boat and or a commercial vessel (including carrier and processor vessels) issued a vessel permit from...

  14. 76 FR 45792 - Proposed Reissuance of a General NPDES Permit for Facilities Related to Oil and Gas Extraction

    Science.gov (United States)

    2011-08-01

    ... proposed rule'' for which the agency ``is required by section 553 of the Administrative Procedure Act (APA... permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA...

  15. 76 FR 20721 - Notice of Permit Applications Received Under the Antarctic Conservation Act

    Science.gov (United States)

    2011-04-13

    .... 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed... conducted in collaboration with the University of California San Diego Keck Center for Magnetic Resonance...

  16. First Commercial US Mixed Waste Vitrification Facility: Permits, Readiness Reviews, and Delisting of Final Wasteform

    International Nuclear Information System (INIS)

    Pickett, J.B.; Norford, S.W.; Diener, G.A.

    1998-01-01

    Westinghouse Savannah River Co. (WSRC) contracted GTS Duratek (Duratek) to construct and operate the first commercial vitrification facility to treat an F-006 mixed (radioactive/hazardous) waste in the United States. The permits were prepared and submitted to the South Carolina state regulators by WSRC - based on a detailed design by Duratek. Readiness Assessments were conducted by WSRC and Duratek at each major phase of the operation (sludge transfer, construction, cold and radioactive operations, and a major restart) and approved by the Savannah River Department of Energy prior to proceeding. WSRC prepared the first 'Upfront Delisting' petition for a vitrified mixed waste. Lessons learned with respect to the permit strategy, operational assessments, and delisting from this 'privatization' project will be discussed

  17. Act N0 65-956 of 12 November 1965 on the third party liability of operators of nuclear ships

    International Nuclear Information System (INIS)

    1965-01-01

    This Act determines the liability of operators of nuclear ships according to the general principles of the Paris Convention. In particular, such operators are solely liable for nuclear damage caused by a nuclear incident up to a limit of 500 millions French francs. With regard to French nuclear ships and insofar as the security provided by the operator is insufficient to meet claims for which he is liable up to the above-mentioned limit, the State intervenes to that amount. (NEA) [fr

  18. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  19. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  20. 75 FR 78236 - Pennamaquan Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-12-15

    ... Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2010. On November 22, 2010, Pennamaquan Tidal... Act (FPA), proposing to study the feasibility of the Pennamaquan Tidal Power Plant Project to be...

  1. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2005-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions'', Section 4.3.1). AOP requirement is for annual monitoring (e.g., four 1 week samples

  2. Has the Federal Government the power to instruct State authorities in procedures under the Atomic Energy Act

    International Nuclear Information System (INIS)

    Ost, W.; Pelzer, N.

    1979-01-01

    The differences in opinion which have emerged between the Federal Government and ministers of the State of North Rhine-Westphalia about further permits to be issued for construction of the SNR 300 fast breeder reactor at Kalkar have raised the question of whether the Federal Government has the right to issue directives to a state authority to grant a permit. Close examination of the legal aspects indicates that hardly any literature and no court decisions are as yet available on this problem, because it has never played a role so far. However, it is undisputed that there is such a right to give instructions. Under the Constitution and the Atomic Energy Act the state authorities are responsible for granting permits, but only as agents acting on behalf of the federal authority. Such instructions must be in accordance with the Atomic Energy Act and the objective sought must be lawful for the instructions to be effective. (orig.) [de

  3. NYPIRG Petition to Object to Yeshiva University's Albert Einstein College of Medicane Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. Response to Petition for EPA to Object to Cash Creek Generation Station's Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  6. US Department of Energy, Nevada Operations Office: Annual site environmental report, 1990

    International Nuclear Information System (INIS)

    McDowell, E.M.; Black, S.C.

    1991-09-01

    Monitoring and surveillance on and around the Nevada Test Site (NTA) by DOE contractors and Site user organizations during 1990 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.05 percent of the guideline for air exposure. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the AIRDOS-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 4.7 x 10 -3 mrem. Any person receiving this dose was also exposed to 123 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits. 63 figs., 88 tabs

  7. Act no 388 to amend Section 15 of the Nuclear Liability Act

    International Nuclear Information System (INIS)

    1986-01-01

    Finland is ratifying the Montreal Protocols Nos 3 and 4 to the Warsaw Convention concerning carriage by air; protocol No 4 contains no exclusion clause for nuclear damage. This Act amends the 1972 Nuclear Liability Act to the effect that air carriers of nuclear substances have a right of recourse against the operator liable under nuclear legislation. In this way the principle of channelling liability onto the nuclear operator is maintained. (NEA) [fr

  8. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-05

    ... Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in.... The proposed project would consist of: (1) 4 OCGen\\TM\\ hydrokinetic tidal devices each consisting of...

  9. 75 FR 2128 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project, to be located on Saxtons River, in...

  10. 48 CFR 970.2210 - Service Contract Act.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  11. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Science.gov (United States)

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  12. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  13. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  14. Run permit software for the proton storage ring

    International Nuclear Information System (INIS)

    Bair, S.S.

    1985-01-01

    The Run Permit system is intended to protect equipment from radiation effects caused by having beam enabled when required equipment is not operational. This system will not allow beam unless certain devices are ready and will drop beam if any of these devices become inoperative. A system to provide such protection might be implemented in hardware. However, because the several operating modes of the Proton Storage Ring/Weapons Neutron Research facility require certain devices to be in different states (depending on mode), a dynamic configuration capability is needed, that is, a software solution is more feasible

  15. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  16. Environmental Compliance Guide. Guidance manual for Department of Energy compliance with the Clean Water Act: National Pollutant Discharge Elimination System (NPDES)

    Energy Technology Data Exchange (ETDEWEB)

    1982-07-01

    This manual provides general guidance for Department of Energy (DOE) officials for complying with Sect. 402 of the Clean Water Act (CWA) of 1977 and amendments. Section 402 authorizes the US Environmental Protection Agency (EPA) or states with EPA approved programs to issue National Pollutant Discharge Elimination System (NPDES) permits for the direct discharge of waste from a point source into waters of the United States. Although the nature of a project dictates the exact information requirements, every project has similar information requirements on the environmental setting, type of discharge(s), characterization of effluent, and description of operations and wastewater treatment. Additional information requirements for projects with ocean discharges, thermal discharges, and cooling water intakes are discussed. Guidance is provided in this manual on general methods for collecting, analyzing, and presenting information for an NPDES permit application. The NPDES program interacts with many sections of the CWA; therefore, background material on pertinent areas such as effluent limitations, water quality standards, toxic substances, and nonpoint source pollutants is included in this manual. Modifications, variances, and extensions applicable to NPDES permits are also discussed.

  17. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  18. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  19. 75 FR 2127 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in...

  20. 20 CFR 670.520 - Are students permitted to hold jobs other than work-based learning opportunities?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Are students permitted to hold jobs other than work-based learning opportunities? 670.520 Section 670.520 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT...

  1. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  2. Guidance for writing permits for the use or disposal of sewage sludge. Draft report

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Section 405(d) of the Clean Water Act (CWA) directs the U.S. Environmental Protection Agency (EPA) to develop regulations containing guidelines for the use and disposal of sewage sludge. On February 19th, 1993, EPA published final regulations at 40 Code of Federal Regulations (CFR) Part 503 as the culmination of a major effort to develop technical standards in response to Section 405(d). These regulations govern three sewage sludge use and disposal practices: land application, surface disposal, and incineration. A key element in EPA's implementation of the Part 503 regulations is educating Agency and State personnel about these new requirements. Although the regulations are generally directly enforceable against all persons involved in the use and disposal of sewage sludge, they will also be implemented through permits issued to treatment works treating domestic sewage as defined in 40 CFR 122.22. Thus, the primary focus of the manual is to assist permit writers in incorporating the Part 503 requirements into permits; it serves as an update to the Guidance for Writing Case-by-Case Permit Conditions for Municipal Sewage Sludge (PB91-145508/HDM).

  3. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  4. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  5. Self-acting shaft seals

    Science.gov (United States)

    Ludwig, L. P.

    1978-01-01

    Self-acting seals are described in detail. The mathematical models for obtaining a seal force balance and the equilibrium operating film thickness are outlined. Particular attention is given to primary ring response (seal vibration) to rotating seat face runout. This response analysis reveals three different vibration models with secondary seal friction being an important parameter. Leakage flow inlet pressure drop and affects of axisymmetric sealing face deformations are discussed. Experimental data on self-acting face seals operating under simulated gas turbine conditions are given. Also a spiral groove seal design operated to 244 m/sec (800 ft/sec) is described.

  6. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  7. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  8. Petition Requesting That the Administrator Object to the Title V Permit for JP Pulliam Power Plant

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Petition Requesting the Administrator Object to Title V Permit for Duke Energy Progress's Richmond County Turbines

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  11. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    International Nuclear Information System (INIS)

    2010-01-01

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  12. Environmental dosimetry for normal operations at SRP. Revision 1

    International Nuclear Information System (INIS)

    Marter, W.L.

    1984-01-01

    The radiological effect of environmental releases from SRP during normal operations has been assessed annually since 1972 with a dosimetry model developed by SRL in 1971 to 1972, as implemented in the MREM code for atmospheric releases and RIVDOSE code for liquid releases. Starting in 1978, SRL started using environmental models and dose commitment factors developed by Nuclear Regulatory Commission (NRC) for all other environmental dose calculations. The NRC models are more flexible than the older SRL models, use more up-to-date methodologies, cover more exposure pathways, and permit more detailed analysis of effects of normal operations. It is recommended that the NRC models, as implemented in the computer codes X0QD0Q and GASPAR for atmospheric releases and LADTAP for liquid releases, and NRC dose commitment factors be used as the standard method at SRP for assessing offsite dose from normal operations in Health Protection Department annual environmental monitoring reports, and in National Environmental Policy Act documents and Safety Analysis Reports for SRP facilities. 23 references, 3 figures, 9 tables

  13. 77 FR 26777 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-05-07

    ... not operate to the disadvantage of the endangered species, and (3) The granted permit would be..., 2012. 64654A Double Springs 77 FR 6816; March 14, 2012. Partnership Ltd. February 9, 2012. 64656A Double Springs 77 FR 6816; March 14, 2012. Partnership Ltd. February 9, 2012. 64723A Larry Friesenhahn...

  14. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  15. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  16. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2005-01-19

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions

  17. Discontinuation of approval of modifications in notes, guaranteed under Title VI or VII of the Public Health Service Act, proposed to permit use of the notes as collateral for tax-exempt financings--PHS. Final rule.

    Science.gov (United States)

    1983-09-21

    The Department of Health and Human Services (HHS) adds a new section to regulations for making and guaranteeing loans for construction and modernization of hospitals and medical facilities and to regulations for guaranteeing loans for the construction of teaching facilities for health professions personnel. Under these regulations HHS will not approve the modification of the terms of an existing loan guaranteed under Title VI or Title VII of the Public Health Service (PHS) Act if the modification would permit use of the guarantee (or guaranteed loan) as collateral for tax-exempt financing.

  18. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  19. Hanford Site Solid Waste Landfill permit application. Revision 1

    International Nuclear Information System (INIS)

    1993-01-01

    Both nonhazardous and nonradioactive sanitary solid waste are generated at the Hanford Site. This permit application describes the manner in which the Solid Waste Landfill will be operated. A description is provided of the landfill, including applicable locational, general facility, and landfilling standards. The characteristics and quantity of the waste disposed of are discussed. The regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill are reviewed. A plan is included of operation, closure, and postclosure. This report addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill is discussed

  20. Resource conversation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume II contains attachments for Module II and Module III. Attachments for Module II are: part A permit application; examples of acceptable documentation; Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program; inspection schedule and monitoring schedule; inspection log forms; personnel training course outlines; hazardous waste job position training requirements; contingency plan; closure plan; and procedures for establishing background for the underground units. One attachment, facility process information, is included for Module III. Remaining attachments for this module are in Volume III

  1. Self-acting and hydrodynamic shaft seals

    Science.gov (United States)

    Ludwig, L. P.

    1973-01-01

    Self-acting and hydrodynamic seals are described. The analytical procedures are outlined for obtaining a seal force balance and the operating film thickness. Particular attention is given to primary ring response (seal vibration) to rotating seat face runout. This response analysis revealed three different vibration modes. Proposed applications of self-acting seals in gas turbine engines and in rocket vehicle turbopumps are described. Also experimental data on self-acting face seals operating under simulated gas turbine conditions are given; these data show the feasibility of operating the seal at conditions of 345 newtons per square centimeter (500 psi) and 152 meters per second (500 ft/sec) sliding speed.

  2. 77 FR 19282 - Draft NPDES General Permit for Discharges From the Oil and Gas Extraction Point Source Category...

    Science.gov (United States)

    2012-03-30

    ... adversely affect an Essential Fish Habitat is subject to the consultation provisions of the Manguson-Stevens Act. The Texas Coastal Subcategory areas covered by this general permit include Essential Fish Habitat... would be unlikely to adversely affect Essential Fish Habitat. EPA received written [[Page 19284...

  3. [ACCEPTANCE AND COMMITMENT THERAPY (ACT): BEHAVIORISM, MINDFULNESS AND VALUES].

    Science.gov (United States)

    Coletti, Juan Pablo; Teti, Germán Leandro

    2015-01-01

    Over the last decades a series of psychological treatments labeled have been developed. Acceptance and Commitment Therapy (ACT) is a third generation therapy that essentially seeks to promote the acceptance of private events in opposition to their modification or change, with the aim of promoting cognitive flexibility. Thus, it is intended that the subject be permitted to choose their behavior consistent with personal values. The current work aims to provide overview specific to the contextual conditions that promoted the emergence of ACT, the underlying philosophy and theory, and the particularities of the intervention model.

  4. 30 CFR 774.12 - Post-permit issuance information requirements for permittees.

    Science.gov (United States)

    2010-07-01

    ... for permittees. 774.12 Section 774.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... competent jurisdiction grants a stay of the cessation order and the stay remains in effect. (c) Within 60...

  5. 78 FR 24768 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2013-N094; FXES11130300000F3-234... Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY... includes a two year scientific research study of acoustic deterrents, wind turbine operational experiments...

  6. 77 FR 29357 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2012-05-17

    ...-FF03E00000] Endangered and Threatened Wildlife and Plants; Permit Applications AGENCY: Fish and Wildlife... U.S. mail to the Regional Director, Attn: Lisa Mandell, U.S. Fish and Wildlife Service, Ecological... speeds and operating protocols. The study is proposed to further understand bat interactions with...

  7. Web-enabled work permit system for fast breeder test reactor

    International Nuclear Information System (INIS)

    Madurai Meenachi, N.; Vinolia, K.; Ramanathan, V.

    2003-01-01

    The objective of this project is to computerize and web-enable the Work Permit System for the Fast Breeder Test Reactor (FBTR) at IGCAR, Kalpakkam. The existing Work Permit System at FBTR was studied in detail. Since all the formalities were paper-based, the risk of human error in scrutinizing all permits before reactor start-up was high. Compilation of reports (daily, monthly, yearly etc.) was tedious. The work permit system was therefore automated in order to enable the operation group manage the maintenance work carried out in the plant systematically with entries. The entire project was classified into five permit modules -maintenance, transfer, return, cancellation and reissue. Each module takes care of the entry and maintenance of data in their respective fields in their respective tables. The user is also provided with an option to take a hard copy of the report of his/her choice. A client/server based system was designed to web-enable the entire project. The server program was designed using VB 6.0 as the front-end and MS Access database as the back end to store the data. The client software was developed using Active Server Pages and published using personal web server in the Intranet. A number of administrative tools have been incorporated in the software to ensure access security and integrity of the database. An online help feature with search facilities was added to the software. The work permit system software is now already being used at FBTR and has been deemed to be an invaluable aid in empowering the availability of the reactor and determining the performance history of the equipment. (author)

  8. 76 FR 28025 - East Maui Pumped Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2011-05-13

    ... Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Act (FPA), proposing to study the feasibility of the East Maui Pumped Storage Water Supply Project to.... Bart M. O'Keeffe, East Maui Pumped Storage Water Supply LLC; P.O. Box 1916; Discovery Bay, CA 94505...

  9. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13723-000] Iron Mask Hydro..., Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask Pumped Storage Project to be...

  10. Standard review plan on antitrust reviews. Final report

    International Nuclear Information System (INIS)

    Lambe, W.M.; Davis, M.J.

    1997-12-01

    This standard review plan describes the procedures used by NRC staff to implement the antitrust review and enforcement provisions in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), and replaces NUREG-0970. These procedures are principally derived from the Commission's Rules and Regulations in 10 CFR Sections 2.101, 2.102, Part 2-Appendix A, Section X, 50.33a, 50.80, 50.90, and 52.77. These procedures set forth the steps and criteria the staff uses in antitrust reviews of construction permit applications, operating license applications, combined construction permit/operating license applications, combined construction permit/operating license applications, and applications for approval of the transfer of construction permits, operating licenses, and combined licenses. In addition, the procedures describe how the staff enforces compliance with antitrust conditions appended to licenses

  11. 78 FR 69812 - Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution by Permits for...

    Science.gov (United States)

    2013-11-21

    ...EPA is proposing to approve portions of two revisions to the Texas State Implementation Plan (SIP) concerning the Permits for Specific Designated Facilities Program, also referred to as the FutureGen Program. EPA has determined that the portions of these SIP revisions specific to the FutureGen Program submitted on March 9, 2006 and July 2, 2010, comply with the Clean Air Act and EPA regulations and are consistent with EPA policies. This action is being taken under section 110 and parts C and D of the Act.

  12. 78 FR 69773 - Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution by Permits for...

    Science.gov (United States)

    2013-11-21

    ...EPA is taking a direct final action to approve portions of two revisions to the Texas State Implementation Plan (SIP) concerning the Permits for Specific Designated Facilities Program, also referred to as the FutureGen Program. EPA has determined that the portions of these SIP revisions specific to the FutureGen Program submitted on March 9, 2006 and July 2, 2010, comply with the Clean Air Act and EPA regulations and are consistent with EPA policies. This action is being taken under section 110 and parts C and D of the Act.

  13. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  14. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  15. Nonpoint Pollution Discharge Permit Testing and Control Strategies at Naval Air Station Whidbey Island.

    Science.gov (United States)

    1991-01-01

    were published in the 16 November 1990 Federal Recister in response to the Water Quality Act of 1987. The existing station permit expires in 1992 and...anaerobic decomposition potential may be of major significance. Biodegradation may not occur, however, if other factors needed for bacterial growth are not... bacterially mediated oxidation of ammonia-nitrogen, these compounds can be toxic to humans or other mammals if present at excessive levels. Sources include

  16. Act No. 732 of December 7, 1988. Act to amend the Act on civil liability for nuclear damage

    International Nuclear Information System (INIS)

    1988-01-01

    This Act amends Act No. 332 of June 19, 1974 on civil liability for nuclear damage, enabling Denmark to ratify the 1982 Protocols to amend the Paris Convention and the Brussels Supplementary Convention as well as the 1988 Joint Protocol relating to the application of the Vienna and the Paris Convention. The 1988 Act raises the nuclear operator's liability from 75 million DKr to 60 million SDRs while cover involving State funds is raised from 120 million units of account to 300 million SDRs. The Act entered into force on July 1, 1989 except for the provision on State funds which becomes effective when the 1982 Protocol amending the Brussels Convention comes into force. (NEA) [fr

  17. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    permitting process in the country as well as important planned (or recently introduced) changes in the relevant legislation. The analysis also presents the role of the regulating authorities as well as other key actors in the process, and outlines the different steps of the permitting processes, including the relationships between the different permits. We also address the responsibility for the radioactive waste and dismantling, and how these issues come into the licensing process. Important differences and similarities across the various countries are highlighted, with special emphasis on parallels to the Swedish legislation. The report then analyzes a number of important legal and political issues of a principal nature in the permitting of nuclear power plants. We compare how the different countries differ on these grounds, and also emphasize some overall lessons and practical experiences of nuclear power development internationally. Three broad issues are discussed. The first of these concerns the notion of nuclear power as a highly political issue, and we analyze the role of the public opinion, the extent to which the regulatory process is independent of policy decisions, as well as the allocation of political power between the national and local levels in the respective countries. Not the least the last issue has been in focus in some of the countries that have reformed their permitting process, and there exist significant inter-country differences. The second issue concerns how a number of countries - most notably the USA and Great Britain - have attempted to streamline their plant permitting processes for new nuclear power. These reforms are characterized by, for instance, a combined construction and operation license, the selection (and exclusion) of geographical locations for new installations, as well as attempts to achieve standardizations of nuclear reactor designs. We pay particular attention to the issues of reactor design standardization, including the scope

  18. 40 CFR 63.130 - Transfer operations provisions-periodic recordkeeping and reporting.

    Science.gov (United States)

    2010-07-01

    ...: A check off on a log sheet; a list of DOT serial numbers or Method 27 data; or a position... in the Notification of Compliance Status or operating permit. (2) Reports of the duration of periods... of Compliance Status or operating permit. (e) The owner or operator of a Group 1 transfer rack shall...

  19. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  20. 75 FR 62850 - Endangered and Threatened Wildlife and Plants; Permit; Habitat Conservation Plan for Operation...

    Science.gov (United States)

    2010-10-13

    ... management and predator control in the Hono o Na Pali Natural Area Reserve; (4) updating estimates of at-sea... location during the fourth and fifth year of the permit. The work that KIUC proposes to carry out is... effects that implementation of any reasonable alternatives could have on endangered and threatened species...

  1. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  2. 48 CFR 970.2204-1-1 - Administrative controls and criteria for application of the Davis-Bacon Act in operational or...

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administrative controls... Administrative controls and criteria for application of the Davis-Bacon Act in operational or maintenance.... The proving out of investigative findings and theories of a scientific and technical nature may...

  3. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  4. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. The data derived from that monitoring will be reported

  5. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2002-02-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting

  6. 9 CFR 590.905 - Importation of restricted eggs or eggs containing more restricted eggs than permitted in the...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Importation of restricted eggs or eggs containing more restricted eggs than permitted in the official standards for U.S. Consumer Grade B. 590.905... EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Imports...

  7. Federal Act of 29 April 1964 on Liability for Nuclear Damage (Atomic Liability Act)

    International Nuclear Information System (INIS)

    Under this Act, the operator of a nuclear installation is liable for any nuclear incident occurring in such installation or which is caused by nuclear substances in his charge. If an incident is caused by a radioisotope, the person in possession of the radioisotope at the time of the incident is liable therefore. When an incident occurs during transport of nuclear substances, the carrier is liable in three cases only: when such substances are neither despatched to nor originating from installations on Austrian territory; when they are despatched without the written consent of the Austrian operator who is to receive them; and when they are not destined for a nuclear installation. Other provisions of the Act fix liability ceilings, a basis for apportionment of compensation when several victims are involved and the amount of security for coverage of the operators liability. The Act came into force on 1 September 1964. (NEA) [fr

  8. Petition to Object to the Proposed Title V Permit for Public Service Company of New Hampshire's Schiller Station

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Petition to Object to the Murphy Oil USA, Inc Meraux Refinery, St. Bernard Parish, Louisiana Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. New York Organic Fertilizer Company, Order Granting In Part and Denying In Part Petition For Objection To Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  12. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  13. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  14. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) section 270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below

  15. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  16. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  17. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  18. 30 CFR 903.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 903.785 Section 903.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ARIZONA § 903.785 Requirements for permits for special categories of mining. Part 785 of this...

  19. 30 CFR 912.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 912.785 Section 912.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.785 Requirements for permits for special categories of mining. Part 785 of this...

  20. 30 CFR 910.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 910.785 Section 910.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA § 910.785 Requirements for permits for special categories of mining. Part 785 of this...

  1. 30 CFR 905.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 905.785 Section 905.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE CALIFORNIA § 905.785 Requirements for permits for special categories of mining. Part 785 of this...

  2. 30 CFR 921.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 921.785 Section 921.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.785 Requirements for permits for special categories of mining. Part 785 of...

  3. 30 CFR 922.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 922.785 Section 922.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN § 922.785 Requirements for permits for special categories of mining. Part 785 of this...

  4. AQUIS: An air quality and permit information management system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, A.E.; Huber, C.C.; Tschanz, J. (Argonne National Lab., IL (USA)); Ryckman, S.J. Jr. (Air Force Logistics Command, Wright-Patterson AFB, OH (USA))

    1991-01-01

    The Air Quality Utility Information System (AQUIS) is a data base management system that operates on a dedicated, IBM-compatible personal computer using dBASE IV. AQUIS is in operation at six of the seven US Air Force Logistics Command (AFLC) bases to assist with the management of the source inventory, permit tracking, and the estimating and tracking of emissions. The system also provides environmental management personnel with information on regulatory requirements and other compliance information. An AFLC base can have over 500 regulated or unregulated emission sources, and the task of tracking and correlating emissions, sources, and permits is substantial. AQUIS is a comprehensive management tool that provides a single system for storing and accessing information previously available only in multiple, uncorrelated files. This paper discusses the development of the system and provides an overview of the system structure and the relationship of that structure to sources in the field. Certain features such as the linking capability and compound-specific emissions are highlighted. The experience of environmental managers, the ultimate system users, is discussed, including specific ways in which AQUIS has proven useful in responding to managers' needs for air quality information. 10 refs., 3 figs., 1 tab.

  5. Political Economy of Tradeable Permits. Competitiveness, Co-operation and Market Power

    Energy Technology Data Exchange (ETDEWEB)

    Convery, F.J.; Dunne, L.; Redmond, L.; Ryan, L.B. [Department of Environmental Studies, University College, Dublin (Ireland)

    2003-07-01

    occurrence of the initiation of our workshop series with publication of these proposals was fortuitous, and provided a continuing deliberative thread to our workshops as they unfolded. The formal withdrawal from the Kyoto Process by the US added another dimension which was incorporated into the research agenda. Our brief did not confine us to climate change or indeed to Europe, but inevitably much of our focus was shaped by these developments. In Venice, Egenhofer (2001) provided a very comprehensive 'state of the art' as regards the theory and (especially) the practise of emissions trading, and its links with other policy instruments, notably taxation. As regards the latter, he notes that 'On a practical level, taxation increasingly is used as a stick to convince industry to accept cap and trade emissions trading programmes'. Typically, firms accepting an absolute cap and participation in cap-and-trade programmes are exempted from environmental or carbon taxes as evidenced in the UK where companies accepting to participate in the ET scheme are exempted up to 80% of the UK climate change levy. The criteria applied in the evaluation of emissions trading are typified by the paper by Boemare and Quirion (2001). They assess the Commission's proposal in some detail, and touch on 10 other schemes from a variety of perspectives, including number of participants and spatial coverage and permit allocation. For each theme, they set out the relevant theoretical framework and its implications, and then assess practise. The parts of their template which address competitiveness, co- operation and market power provides a convenient framework into which to incorporate some of the relevant political economy issues that were addressed in the research literature presented at the workshops.

  6. Political Economy of Tradeable Permits. Competitiveness, Co-operation and Market Power

    International Nuclear Information System (INIS)

    Convery, F.J.; Dunne, L.; Redmond, L.; Ryan, L.B.

    2003-01-01

    of our workshop series with publication of these proposals was fortuitous, and provided a continuing deliberative thread to our workshops as they unfolded. The formal withdrawal from the Kyoto Process by the US added another dimension which was incorporated into the research agenda. Our brief did not confine us to climate change or indeed to Europe, but inevitably much of our focus was shaped by these developments. In Venice, Egenhofer (2001) provided a very comprehensive 'state of the art' as regards the theory and (especially) the practise of emissions trading, and its links with other policy instruments, notably taxation. As regards the latter, he notes that 'On a practical level, taxation increasingly is used as a stick to convince industry to accept cap and trade emissions trading programmes'. Typically, firms accepting an absolute cap and participation in cap-and-trade programmes are exempted from environmental or carbon taxes as evidenced in the UK where companies accepting to participate in the ET scheme are exempted up to 80% of the UK climate change levy. The criteria applied in the evaluation of emissions trading are typified by the paper by Boemare and Quirion (2001). They assess the Commission's proposal in some detail, and touch on 10 other schemes from a variety of perspectives, including number of participants and spatial coverage and permit allocation. For each theme, they set out the relevant theoretical framework and its implications, and then assess practise. The parts of their template which address competitiveness, co- operation and market power provides a convenient framework into which to incorporate some of the relevant political economy issues that were addressed in the research literature presented at the workshops

  7. Matrimonial Causes Act, 1989 (No. 58 of 1989), 28 December 1989.

    Science.gov (United States)

    1989-01-01

    This document contains major provisions of the 1989 Matrimonial Causes Act of Saint Vincent and the Grenadines. These provisions cover 1) divorce, nullity, separation petitions, and presumed death of a spouse; 2) spousal and child support arrangements; 3) child custody; and 4) permitted court actions in cases of polygamy.

  8. US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

    1993-09-01

    This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

  9. 77 FR 72431 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-12-05

    ... principle place of business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary... with regard to whether issuing a new Presidential Permit reflecting the corporate succession and...

  10. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-12-05

    ... business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary of Plains All... whether issuing a new Presidential Permit reflecting the corporate succession and authorizing Plains LPG...

  11. 75 FR 25855 - Clean Air Act Advisory Committee (CAAAC): Notice of Meeting

    Science.gov (United States)

    2010-05-10

    ...) Permits/NSR/Toxics Integration--Liz Naess, (919) 541-1892; (2) Economic Incentives and Regulatory... Air Act of 1990. The Committee advises on economic, environmental, technical scientific, and...., Washington, DC. Seating will be available on a first come, first served basis. The Economic Incentives and...

  12. 77 FR 52233 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-08-29

    ...: EPA is approving revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution... Regulations for the Control of Atmospheric Pollution (PRRCAP). In the context of the Clean Air Act (CAA or Act... that approved the revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution...

  13. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1991-01-01

    The US Department of Energy is currently constructing the Waste Isolation Pilot near Carlsbad, New Mexico. The full-scale pilot plant will demonstrate the feasibility of the safe disposal of defense-related nuclear waste in a bedded salt formation at a depth of 2160 feet below the surface. WIPP will provide for the permanent storage of 25,000 cu ft of remote-handled (RH) transuranic waste and 6,000,000 cu ft of contact-handled (CH) transuranic waste. This paper covers the major mechanical/structural design considerations for the waste hoist and its hoist tower structure. The design of the hoist system and safety features incorporates state-of-the-art technology developed in the hoist and mining industry to ensure safe operation for transporting nuclear waste underground. Also included are design specifications for VOC-10 monitoring system

  14. 78 FR 28000 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-05-13

    ... 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has... facilities and equipment. Location Antarctic Peninsula region, ASPA 117-Avian Island, ASPA 128 Cape...

  15. 75 FR 7227 - Atlantic Coastal Fisheries Cooperative Management Act Provisions; Application for Exempted...

    Science.gov (United States)

    2010-02-18

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration 50 CFR Part 600 and 697 RIN 0648-XT83 Atlantic Coastal Fisheries Cooperative Management Act Provisions; Application for Exempted Fishing Permits (EFPs) AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric...

  16. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  17. 78 FR 54686 - Notice of Permit Applications Received under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-05

    ... the Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism... of the ongoing effort to monitor the spatial scale of human impacts in Antarctica. Samples taken near...

  18. 78 FR 18960 - Atlantic Coastal Fisheries Cooperative Management Act Provisions; General Provisions for Domestic...

    Science.gov (United States)

    2013-03-28

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XC586 Atlantic Coastal Fisheries Cooperative Management Act Provisions; General Provisions for Domestic Fisheries; Application for Exempted Fishing Permits AGENCY: National Marine Fisheries Service (NMFS), National Oceanic...

  19. 31 CFR 0.216 - Privacy Act.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Privacy Act. 0.216 Section 0.216... RULES OF CONDUCT Rules of Conduct § 0.216 Privacy Act. Employees involved in the design, development, operation, or maintenance of any system of records or in maintaining records subject to the Privacy Act of...

  20. 77 FR 50720 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-08-22

    ... Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and..., bill and flipper dimensions taken, 3-5 feathers removed to confirm gender of the penguin, and have GPS...

  1. 78 FR 56743 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... by the Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science... measure ablation and GPS units to monitor the motion of the glacier. The GPR system will be moved...

  2. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    International Nuclear Information System (INIS)

    1993-12-01

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment

  3. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology

  4. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  5. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  6. 77 FR 27451 - Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using Diesel Fuels-Draft...

    Science.gov (United States)

    2012-05-10

    ... (other than diesel fuels) pursuant to hydraulic fracturing operations related to oil, gas, or geothermal... during HF related to oil, gas, or geothermal operations must obtain a UIC permit before injection begins... diesel fuels are available through the UIC Class II Program, the well class for oil and gas activities.\\1...

  7. TetR-dependent gene regulation in intracellular Listeria monocytogenes demonstrates the spatiotemporal surface distribution of ActA.

    Science.gov (United States)

    Schmitter, Sibylle; Fieseler, Lars; Klumpp, Jochen; Bertram, Ralph; Loessner, Martin J

    2017-08-01

    To enable specific and tightly controlled gene expression both in vitro and during the intracellular lifecycle of the pathogen Listeria monocytogenes, a TetR-dependent genetic induction system was developed. Highest concentration of cytoplasmic TetR and best repression of tetO-controlled genes was obtained by tetR expression from the synthetic promoter Pt 17 . Anhydrotetracycline (ATc) as inducer permitted concentration-dependent, fine-tuned expression of genes under control of the tetO operator and a suitable promoter. The actin-polymerizing ActA protein represents a major virulence factor of L. monocytogenes, required for actin-based motility and cell-to-cell spread in infected host cells. To be able to observe its spatial and temporal distribution on intracellular L. monocytogenes cells, conditional mutants featuring actA placed under TetR control were used to infect PtK2 epithelial cells. Following induction at different time intervals, the subsequent recruitment of actin by L. monocytogenes could be monitored. We found that cells displayed functional ActA after approximately 15 min, while formation of polarized actin tail was complete after 90-120 min. At this point, intracellular motility of the induced mutants was indistinguishable from wild-type bacteria. Interestingly, de novo ActA synthesis in intracellular Listeria also demonstrated the temporal, asymmetric redistribution of the membrane-anchored proteins from the lateral walls toward the cell poles. © 2017 John Wiley & Sons Ltd.

  8. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  9. Family and Medical Leave Act; Definition of Spouse. Final rule.

    Science.gov (United States)

    2016-04-08

    The U.S. Office of Personnel Management (OPM) is revising the definition of spouse in its regulations on the Family and Medical Leave Act (FMLA) as a result of the decision by the United States Supreme Court holding section 3 of the Defense of Marriage Act (DOMA) unconstitutional. The new definition replaces the existing definition, which contains language from DOMA that refers to "a legal union between one man and one woman.'' The new definition permits Federal employees with same-sex spouses to use FMLA leave in the same manner as Federal employees with opposite-sex spouses.

  10. 77 FR 7610 - Notice of permit applications received under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-02-13

    ... 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has... to be used for K-12 educational outreach activities. In general, the bird parts will be an example of...

  11. Section 294 of the children's act: do roots really matter? | van ...

    African Journals Online (AJOL)

    Section 294 of the Children's Act 38 of 2005 currently only permits commissioning parents to engage in surrogacy arrangements in instances where they are able to provide a genetic link to their future offspring. This provision then excludes other infertile individuals, who due to the cause of their infertility are unable to ...

  12. Hanford Waste Vitrification Plant Clean Air Act permit application

    International Nuclear Information System (INIS)

    1990-04-01

    This document briefly describes the Hanford Site and provides a general overview of the Hanford Waste Vitrification Plant (HWVP). Other topics include sources of emissions, facility operating parameters, facility emissions, pollutant and radionuclide control technology and air quality. The HWVP will convert mixed wastes (high-activity radioactive and hazardous liquid wastes) to a solid vitrified form (borosilicate glass) for disposal. Mixed wastes pretreated in the Hanford Site B Plant will be pumped into double- shell tanks in the 200 East Area for interim storage. This pretreated mixed waste will be batch transferred from interim storage to the HWVP facility, where the waste will be concentrated by evaporation, treated with chemicals, and mixed with glass-forming materials. The mixture will then be continuously fed into an electrically heated glass melter. The molten glass will be poured into canisters that will be cooled, sealed, decontaminated, and stored until the vitrified product can be transferred to a geologic repository. 25 refs., 18 figs., 32 tabs

  13. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  14. Application of Clean Water (CWA) Section 404 compensatory wetland mitigation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

    International Nuclear Information System (INIS)

    Abbott, D.J.; Straub, C.A.

    1994-01-01

    Pursuant to Section 404 of the Clean Water Act (CWA), activities resulting in the discharge of dredge or fill material into waters of the US, including wetlands, require permit authorization from the US Army Corps of Engineers (ACOE). As part of the Section 404 permitting process, compensatory wetland mitigation in the form of wetland enhancement, restoration, or construction may be required to off-set impacts sustained under a Section 404 permit. Under normal circumstances, compensatory mitigation is a relatively straight forward process; however, issues associated with mitigation become more complex at sites undergoing remediation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), because on-site response/remedial actions involving dredged and fill material are not subject to the formal Section 404 permitting process. These actions are conducted in accordance with the substantive permitting requirements of the ACOE's Nationwide and individual permitting programs. Wetland mitigatory requirements are determined through application of the US Environmental Protection Agency's (USEPA's) 040(b) (1) Guidelines promulgated in 40 CFR Part 230 and are implemented through compliance with substantive permitting requirements during the conduct of response/remedial actions. A programmatic approach for implementing wetland mitigatory requirements is being developed at a former US Department of Energy (DOE) uranium refinery undergoing CERCLA remediation in southwestern Ohio. The approach is designed to define the regulatory mechanism that will be used to integrate CWA driven wetland mitigatory requirements into the CERCLA process

  15. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  16. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  17. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  18. 78 FR 54437 - Interagency Cooperation-Endangered Species Act of 1973, as Amended; Incidental Take Statements

    Science.gov (United States)

    2013-09-04

    ... affecting the species (e.g., for an aquatic species, changes in water temperature or chemistry, flows, or... proposed Clean Water Act permit issued by the Army Corps of Engineers, a quarter-acre of wetlands composed...

  19. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  20. 76 FR 77558 - Sunshine Act Meeting; Notice

    Science.gov (United States)

    2011-12-13

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting; Notice DATES: Date and Time: The Legal Services Corporation's Operations & Regulations Committee will meet December 16, 2011. The meeting will commence at 4 p... Bylaws necessitated by the DC Nonprofit Corporation Act of 2010. 3. Public comment. 4. Consider and act...

  1. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  2. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  3. Nuclear Liability Act of 8 June 1972 as amended by the Act of 15 September 1989

    International Nuclear Information System (INIS)

    1989-09-01

    The 1972 Nuclear Liability Act has been amended by an Act 1989 to bring its provisions in line with those of the Paris Convention and the Brussels Supplementary Convention as amended respectively by the 1982 Protocols. The 1989 Act also raises the limit of the nuclear operator's liability from 42 million Finnish marks (approximately 8 million Special Draing Rights - SDRs) to 100 million SDRs [fr

  4. Space platforms - A cost effective evolution of Spacelab operation

    Science.gov (United States)

    Stofan, A. J.

    1981-01-01

    The capabilities added to the Shuttle/Spacelab configuration by the addition of the Power Extension Package (PEP), the Power System (PS), and the Science and Applications Space Platforms (SASP) are reviewed with an emphasis on SASP. SASP are intended for placement in orbit by the Shuttle to test new instruments and systems, for clustering of instrumentation, and for servicing, refurbishment, repair, or augmentation by the Shuttle. The PEP permits extended stays in orbit (30 days), and the PS is an orbital solar array and energy storage system acting as a free flying spacecraft. The Shuttle can deliver payloads to the PS or attach to it for extension of the Spacelab operations. Applications of SASP for long term space-based biological experiments are outlined, and the fact that SASP do not increase the required Shuttle in-orbit time is stressed.

  5. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  6. 32 CFR Appendix G to Part 323 - Privacy Act Enforcement Actions

    Science.gov (United States)

    2010-07-01

    ... right granted by this DLAR will be permitted to seek relief through appropriate administrative channels... damages, court cost, and attorney fees in some cases. D. Criminal Penalties— 1. The Privacy Act also provides for criminal penalties (see 5 U.S.C. 552a(1).) Any official or employee may be found guilty of a...

  7. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  8. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  9. Alternative Work Schedules: Many Agencies Do Not Allow Employees the Full Flexibility Permitted by Law. Report to Congressional Committees.

    Science.gov (United States)

    General Accounting Office, Washington, DC. General Government Div.

    A review was conducted of the extent to which selected federal agencies are allowing employees to use alternative work schedules (AWS) as authorized by the Federal Employees Flexible and Compressed Work Schedules Act. The statute permits, rather than requires, agencies to institute AWS programs. The study surveyed the policies and practices of 59…

  10. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  11. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  12. 43 CFR 23.4 - Application for permission to conduct exploration operations.

    Science.gov (United States)

    2010-10-01

    ... to be disturbed, explore, test, or prospect for minerals (other than oil and gas) subject to disposition under the mineral leasing acts without first filing an application for, and obtaining, a permit...

  13. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  14. 75 FR 30395 - Stakeholder Input; National Pollutant Discharge Elimination System (NPDES) Permit Requirements...

    Science.gov (United States)

    2010-06-01

    ... peak flow as part of an SSO rulemaking to allow for a holistic and integrated approach to reducing SSOs... Charles Glass, EPA Headquarters, Office of Water, Office of Wastewater Management at tel.: 202-564-0418 or... principles with the following suggested NPDES permit requirements: (1) Capacity, management, operation and...

  15. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  16. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  17. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    The PUREX Storage Tunnels are a mixed waste storage unit consisting of two underground railroad tunnels: Tunnel Number 1 designated 218-E-14 and Tunnel Number 2 designated 218-E-15. The two tunnels are connected by rail to the PUREX Plant and combine to provide storage space for 48 railroad cars (railcars). The PUREX Storage Tunnels provide a long-term storage location for equipment removed from the PUREX Plant. Transfers into the PUREX Storage Tunnels are made on an as-needed basis. Radioactively contaminated equipment is loaded on railcars and remotely transferred by rail into the PUREX Storage Tunnels. Railcars act as both a transport means and a storage platform for equipment placed into the tunnels. This report consists of part A and part B. Part A reports on amounts and locations of the mixed water. Part B permit application consists of the following: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report

  18. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 and 2

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for asbestos and open burning

  19. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  20. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.