WorldWideScience

Sample records for accurate systems installed

  1. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  2. Caregivers’ Use of Child Passenger Safety Resources and Quality of Future Child Restraint System Installations

    Directory of Open Access Journals (Sweden)

    Jessica H. Mirman

    2017-10-01

    Full Text Available Objectives: Child Restraint System (CRS misuse is common. We characterized caregivers’ use of child passenger safety informational and instructional resources and determined whether there were differences in the quality of CRS installations associated with prior exposure to specific resources as evaluated in a standardized CRS installation environment. Methods: Caregivers completed self-report surveys and installed a forward-facing CRS in a controlled environment. Installations were evaluated for security (tightness and accuracy (no errors by a child passenger safety technician (CPST. Results: CRS manuals were the most common way caregivers learned to install a CRS. Primary care providers (PCPs were the most frequently endorsed source of CRS safety information. There was no strong pattern of associations between prior exposure to resources and installation quality (security or accuracy, although some evidence supports protective effects of learning from CPSTs; 13% (19 out of 151 installations were secure and 57% (86 out of 151 installations were accurate. Conclusions: A focus on developing effective and lasting behavioral interventions is needed.

  3. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  4. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  5. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  6. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  7. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  8. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  9. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  10. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  11. Accurate activity recognition in a home setting

    NARCIS (Netherlands)

    van Kasteren, T.; Noulas, A.; Englebienne, G.; Kröse, B.

    2008-01-01

    A sensor system capable of automatically recognizing activities would allow many potential ubiquitous applications. In this paper, we present an easy to install sensor network and an accurate but inexpensive annotation method. A recorded dataset consisting of 28 days of sensor data and its

  12. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  13. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  14. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  15. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  16. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  17. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  18. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  19. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  20. Approaching system equilibrium with accurate or not accurate feedback information in a two-route system

    Science.gov (United States)

    Zhao, Xiao-mei; Xie, Dong-fan; Li, Qi

    2015-02-01

    With the development of intelligent transport system, advanced information feedback strategies have been developed to reduce traffic congestion and enhance the capacity. However, previous strategies provide accurate information to travelers and our simulation results show that accurate information brings negative effects, especially in delay case. Because travelers prefer to the best condition route with accurate information, and delayed information cannot reflect current traffic condition but past. Then travelers make wrong routing decisions, causing the decrease of the capacity and the increase of oscillations and the system deviating from the equilibrium. To avoid the negative effect, bounded rationality is taken into account by introducing a boundedly rational threshold BR. When difference between two routes is less than the BR, routes have equal probability to be chosen. The bounded rationality is helpful to improve the efficiency in terms of capacity, oscillation and the gap deviating from the system equilibrium.

  1. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  2. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  4. The installation of helium auxiliary systems in HTGR

    International Nuclear Information System (INIS)

    Qin Zhenya; Fu Xiaodong

    1993-01-01

    The inert gas Helium was chosen as reactor coolant in high temperature gas coolant reactor, therefore a set of Special and uncomplex helium auxiliary systems will be installed, the safe operation of HTR-10 can be safeguarded. It does not effect the inherent safety of HTR-10 MW if any one of all those systems were damaged during operation condition. This article introduces the design function and the system principle of all helium auxiliary systems to be installed in HTR-10. Those systems include: helium purification and its regeneration system, helium supply and storage system, pressure control and release system of primary system, dump system for helium auxiliary system and fuel handling, gaseous waste storage system, water extraction system for helium auxiliary systems and evacuation system for primary system

  5. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  6. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  7. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  8. Installation dismantling system, working process and hood utilizable in this system

    International Nuclear Information System (INIS)

    Poirier, J.C.; Mulcey, P.; Morel, P.; Vavasseur, C.

    1989-01-01

    The system for dismantling an installation under a controlled atmosphere is made by a tool polluting the atmosphere, a gas blanket creating a continement zone around the tool, an extractor removing polluted gas from the zone, a purifier for the extracted gas and a controller regulating the flow of gas in the blanket and keeping the installation at constant pressure [fr

  9. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  10. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  11. Installation of wireless LAN system into the SuperKEKB accelerator tunnel

    International Nuclear Information System (INIS)

    Iwasaki, Masako; Satoh, Masanori

    2014-01-01

    We have installed a wireless LAN system of the accelerator control network into the accelerator tunnel for SuperKEKB, which is the upgrade plan of the KEKB B-factory project. The wireless LAN system is used for the construction and maintenance of the accelerator components. The leaky coaxial cable (LCX) antennas are installed into the arc sections of SuperKEKB tunnel, and the collinear antennas are installed into the straight sections and the injector Linac. We have selected the LCX and collinear antennas with good radiation hardness of more than 1 MGy. After the installation, we evaluated the wireless LAN system and obtained the good network speed performance in the whole tunnel area. (author)

  12. Installation package - SIMS prototype system 1A

    Science.gov (United States)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  13. Flow Simulation of Modified Duct System Wind Turbines Installed on Vehicle

    Science.gov (United States)

    Rosly, N.; Mohd, S.; Zulkafli, M. F.; Ghafir, M. F. Abdul; Shamsudin, S. S.; Muhammad, W. N. A. Wan

    2017-10-01

    This study investigates the characteristics of airflow with a flow guide installed and output power generated by wind turbine system being installed on a pickup truck. The wind turbine models were modelled by using SolidWorks 2015 software. In order to investigate the characteristic of air flow inside the wind turbine system, a computer simulation (by using ANSYS Fluent software) is used. There were few models being designed and simulated, one without the rotor installed and another two with rotor installed in the wind turbine system. Three velocities being used for the simulation which are 16.7 m/s (60 km/h), 25 m/s (90 km/h) and 33.33 m/s (120 km/h). The study proved that the flow guide did give an impact to the output power produced by the wind turbine system. The predicted result from this study is the velocity of the air inside the ducting system of the present model is better that reference model. Besides, the flow guide implemented in the ducting system gives a big impact on the characteristics of the air flow.

  14. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Science.gov (United States)

    2010-07-01

    ... Operations § 250.1628 Design, installation, and operation of production systems. (a) General. All production... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Design, installation, and operation of production systems. 250.1628 Section 250.1628 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF...

  15. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  16. A modernized and versatile startup reactivity measuring system installed at NPP Paks and its application for subcritical systems

    International Nuclear Information System (INIS)

    Czibok, T.; Dezso, Z.; Horvath, Cs.; Lipcsei, S.; Vegh, J.; Pos, I.

    2006-01-01

    In 2004 the Hungarian Paks NPP completed a project for upgrading the reactivity measuring system applied during reactor startup experiments. Almost all components of the previous system were replaced, only ex-core ionisation chambers remained unaltered. New hardware and software components were introduced for neutron flux signal handling, for data acquisition, as well as for measurement evaluation and data presentation. High-precision picoamper meters were installed at each reactor unit, current signals are handled by a portable signal processing unit. The system applies an accurate on-line reactivity calculation algorithm based on the point-kinetic model with six delayed neutron groups. Detailed off-line evaluation and analysis of startup measurements can be performed on the portable unit, as well. The paper describes the architecture, data acquisition modules, services and man-machine interface of the new system. Functions and results are illustrated with measured data recorded during a startup of Unit 3. In 2003 and 2004 the RMR was installed and tested at all Paks NPP units successfully and now it is in regular use during unit startups. The second part of the paper illustrates an extension of the new system to perform reactivity measurements using the well-known Rossi-α and Feynman-α statistical methods. The modified system was needed to estimate the reactivity of a subcritical system formed by damaged fuel assemblies stored at the fuel service pit of Paks Unit 2. Theoretical background of the applied algorithms is outlined, then results of validation tests and on site measurements are treated. The measurements have shown that the subcriticality of the damaged fuel was sufficiently deep if the high boron concentration in the fuel service pit was maintained

  17. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  18. Accurate radiotherapy positioning system investigation based on video

    International Nuclear Information System (INIS)

    Tao Shengxiang; Wu Yican

    2006-01-01

    This paper introduces the newest research production on patient positioning method in accurate radiotherapy brought by Accurate Radiotherapy Treating System (ARTS) research team of Institute of Plasma Physics of Chinese Academy of Sciences, such as the positioning system based on binocular vision, the position-measuring system based on contour matching and the breath gate controlling system for positioning. Their basic principle, the application occasion and the prospects are briefly depicted. (authors)

  19. Renewable energy systems in Mexico: Installation of a hybrid system

    Science.gov (United States)

    Pate, Ronald C.

    1993-05-01

    Sandia has been providing technical leadership on behalf of DOE and CORECT on a working level cooperative program with Mexico on renewable energy (PROCER). As part of this effort, the Sandia Design Assistance Center (DAC) and the solar energy program staff at Instituto de Investigaciones Electricas (IIE) in Cuernavaca, Mexico, recently reached agreement on a framework for mutually beneficial technical collaboration on the monitoring and field evaluation of renewable energy systems in Mexico, particularly village-scale hybrid systems. This trip was made for the purpose of planning the details for the joint installation of a data acquisition system (DAS) on a recently completed PV/Wind/Diesel hybrid system in the village of Xcalac on the Southeast coast of the state of Quintana Roo, Mexico. The DAS installation will be made during the week of March 15, 1993. While in Mexico, discussions were also held with personnel from.the National Autonomous University of Mexico (UNAM) Solar Energy Laboratory and several private sector companies with regard to renewable energy project activities and technical and educational support needs in Mexico.

  20. Installation Guidelines for Solar DHW Systems in One- and Two-Family Dwellings. Second Edition.

    Science.gov (United States)

    Hollander, Peter; And Others

    Described are some of the better techniques for installing solar domestic hot water (DHW) systems. By using these guidelines, along with the manufacturer's manual, professional installation contractors and skilled homeowners should be able to install and fill a solar DHW system. Among the topics considered are system layouts, siting, mounting…

  1. Input-output analysis for installing renewable energy systems

    International Nuclear Information System (INIS)

    Itoh, Y.; Nakata, T.

    2004-01-01

    Renewable energy facilities have been installed in many regions, because of their possibility to be an alternative to fossil fuels for mitigating global warming. Besides the profitability of renewable energy businesses, indirect economic effects of installing renewable energy facilities should be clarified. This study examines the possibility that the renewable energy facilities give renewed impetus to regional economic progress. The economic effects are analysed with input-output techniques in a rural area in Japan. As a consequence, both positive and negative effects on the rural economy are derived. In addition, we will focus on the changes in sectors such as construction, business services, banking, etc. as a result of economic activities for renewable systems. The business benefits of renewable energy system are discussed. (author)

  2. Regional Information System for Educators: Installation and Evaluation.

    Science.gov (United States)

    Kromer, Charles

    This document describes the installation and evaluation of the Regional Information System within the Michigan-Ohio Regional Educational Laboratory (MOREL). MOREL is an agency established to develop and test alternatives to current educational practice under Title IV of ESEA. The Regional Information System was established to provide referrals to…

  3. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  4. Solar hot water system installed at Las Vegas, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

  5. The installation of a multiport ground-water sampling system in the 300 Area

    International Nuclear Information System (INIS)

    Gilmore, T.J.

    1989-06-01

    In 1988, the Pacific Northwest Laboratory installed a multiport groundwater sampling system in well 399-1-20, drilled north of the 300 Area on the Hanford Site in southwestern Washington State. The purpose of installing the multiport system is to evaluate methods of determining the vertical distribution of contaminants and hydraulic heads in ground water. Well 399-1-20 is adjacent to a cluster of four Resource Conservation and Recovery Act (RCRA) ground-water monitoring wells. This proximity makes it possible to compare sampling intervals and head measurements between the multiport system and the RCRA monitoring wells. Drilling and installation of the multiport system took 42 working days. Six sampling ports were installed in the upper unconfined aquifer at depths of approximately 120, 103, 86, 74, 56, and 44 feet. The locations of the sampling ports were determined by the hydrogeology of the area and the screened intervals of adjacent ground-water monitoring wells. The system was installed by backfilling sand around the sampling ports and isolating the ports with bentonite seals. The method proved adequate. For future installation, however, development and evaluation of an alternative method is recommended. In the alternative method suggested, the multiport system would be placed inside a cased and screened well, using packers to isolate the sampling zones. 4 refs., 8 figs., 1 tab

  6. Evaluating the Effect of a Mechanical Adjunct to Improve the Installation of Child Restraint Systems to Vehicles.

    Science.gov (United States)

    Mirman, Jessica H; Seifert, Sara J; Zonfrillo, Mark R; Metzger, Kristi; Durbin, Dennis R; Arbogast, Kristy B

    2015-01-01

    We explored if an alternative CRS design that utilized a mechanical adjunct to amplify the force applied to the adult seat belt (intervention CRS) results in more accurate and secure attachment between the CRS and the vehicle compared to similar CRS models that use LATCH or the existing adult seat belt. We conducted three separate studies to address this question and additionally explored: (1) the contribution of prior CRS installation experience (Study 1), (2) the value-added of CRS labeling (Study 2), and (3) paper-based vs. video instructions (Study 3). In Studies 1 and 2 we assessed a forward facing combination CRS design (intervention CRS) compared to a commercially available LATCH equipped model (control CRS) and in Study 3 we conducted a similar study using a convertible model of both the intervention and control CRS. Participants installed both CRS in a contemporary minivan and could choose which type of attachment to use for the control CRS (LATCH or seat belt); order of installation was counter-balanced. Evaluators systematically examined installations for accuracy and security. Study 1: A greater proportion of participants in both the experienced and inexperienced groups was able to securely install the intervention CRS compared to the control CRS: (45% vs. 16%, p =.0001 for experienced) and (37% vs. 6%, p =.003 for inexperienced). No differences between the CRS were observed for accuracy of installation in either user group. Study 2: A greater proportion of participants were able to securely install the enhanced intervention CRS compared to the control CRS: (62% vs. 9%, p =.001). The intervention CRS demonstrated reduced installation accuracy: (30% vs. 61%, p =.001). Study 3: A greater proportion of participants was able to securely install the intervention CRS compared to the control CRS: 79% vs. 66% p =.03, but this effect was smaller than in the previous studies. Participants were less likely to achieve an accurate installation with the intervention

  7. Environmental Monitoring Techniques and Equipment related to the installation and operation of Marine Energy Conversion Systems

    International Nuclear Information System (INIS)

    Scanu, Sergio; Carli, Filippo Maria; Piermattei, Viviana; Bonamano, Simone; Paladini de Mendoza, Francesco; Marcelli, Marco; Peviani, Maximo Aurelio; Dampney, Keith; Norris, Jennifer

    2015-01-01

    Results of activities under project Marine Renewables Infrastructure Network for Emerging Energy Technologies (MaRINET) are reported, which led to DEMTE, a database, created on the basis of standardized monitoring of the marine environment during installation, operation and decommissioning of Marine Energy Conversion Systems. Obtained with the consortium partners’ available techniques and equipment, the database shows that such instruments cover all identified marine environmental compartments, despite the lack of underwater vehicles and the reduced skills in using satellite technologies. These weaknesses could be overcome by an accurate planning of equipment, techniques and knowledge sharing. The approach here presented also leads to an effective analysis even in non-marine contexts

  8. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  9. RMR. A new portable Reactivity Measuring System installed at NPP Paks

    International Nuclear Information System (INIS)

    Czibok, T.; Horvath, C.; Bara, P.; Dezsoe, Z.; Laz, J.; Vegh, J.; Pos, I.

    2003-01-01

    The Hungarian Paks NPP is conducting a two year project for upgrading the reactivity measuring system applied during reactor startup experiments. The NPP has decided to replace almost all components of the previous system, only ionisation chambers remain unaltered. Devices for measuring neutron flux by means of ionisation chambers, for data acquisition and for measurement evaluation were completely renewed: new hardware-software components were introduced. Autonomous, high-precision current measuring systems (picoampere meters) are applied at each reactor unit, the converted picoampere signals are handled by a portable processing unit. The portable unit - based on a notebook PC - handles measured signals by using a high-precision A/D converter card, the scan time is 0.10 sec. In addition to handling three ionisation chamber signals the portable unit collects control rod position measurements through a serial line. The portable unit is able to receive additional measured data (e.g. core inlet temperature and boron concentration) from the process computer via local area network. Archiving of all measured and calculated data is performed in a redundant manner: data are stored locally and in the process computer, as well. The new system applies an accurate on-line reactivity calculation algorithm based on the point-kinetic model with 6 delayed neutron groups. Input data (effective delayed neutron fraction and other delayed neutron parameters) to the on-line calculation are taken from the off-line core design calculation. Detailed evaluation and analysis of startup measurements can be performed also on the portable unit. The user interface of the system is tailored to support various startup measurement tasks effectively: measured and calculated data are displayed on trends and on dedicated pictures. A user-friendly trending and listing graphic tool facilitates visualisation of archived data. The paper describes the architecture, data acquisition modules, algorithms and

  10. System performance of a three-phase PV-grid-connected system installed in Thailand. Data monitored analysis

    International Nuclear Information System (INIS)

    Boonmee, Chaiyant; Watjanatepin, Napat; Plangklang, Boonyang

    2009-01-01

    PV-grid-connected systems are worldwide installed because it allows consumer to reduce energy consumption from the electricity grid and to feed the surplus energy back into the grid. The system needs no battery so therefore the system price is very cheap comparing to other PV systems. PV-grid-connected systems are used in buildings that already hooked up to the electrical grid. Finding efficiency of the PV-grid-connected system can be done by using a standard instrument which needs to disconnect the PV arrays from the grid before measurement. The measurement is also difficult and we lose energy during the measurement. This paper will present the system performance of a PV-grid-connected system installed in Thailand by using a monitoring system. The monitored data are installed by acquisition software into a computer. Analysis of monitored data will be done to find out the system performance without disconnecting the PV arrays from the system. The monitored data include solar radiation, PV voltage, PV current, and PV power which has been recorded from a 5 kWp system installed of amorphous silicon PV at Rajamangala University of Technology Suvarnabhumi, Nonthaburi, Thailand. The system performance of the system by using the data monitored is compared to the standard instrument measurement. The paper will give all details about system components, monitoring system, and monitored data. The result of data analysis will be fully given. (author)

  11. Accurately bearing measurement in non-cooperative passive location system

    International Nuclear Information System (INIS)

    Liu Zhiqiang; Ma Hongguang; Yang Lifeng

    2007-01-01

    The system of non-cooperative passive location based on array is proposed. In the system, target is detected by beamforming and Doppler matched filtering; and bearing is measured by a long-base-ling interferometer which is composed of long distance sub-arrays. For the interferometer with long-base-line, the bearing is measured accurately but ambiguously. To realize unambiguous accurately bearing measurement, beam width and multiple constraint adoptive beamforming technique is used to resolve azimuth ambiguous. Theory and simulation result shows this method is effective to realize accurately bearing measurement in no-cooperate passive location system. (authors)

  12. ACP Facility Safety Surveillance System Installation

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-10-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hotcell was built in the IMEF basement. All facilities which treat radioactive materials must manage CCTV system which is under control of Health Physics department. Three main points (including hotcell rear door area) have each camera, but operators who are in charge of facility management need to check the safety of the facility immediately through the network in his office. This needs introduce additional network cameras installation and this new surveillance system is expected to update the whole safety control ability with existing system

  13. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  14. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ... Submerged Liquid Storage Systems,” and the American Petroleum Institute (API) Publication 1632, “Cathodic... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615 (November 1979), “Installation of...

  15. [Requirements for the successful installation of an data management system].

    Science.gov (United States)

    Benson, M; Junger, A; Quinzio, L; Hempelmann, G

    2002-08-01

    Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.

  16. The effectiveness of the installation of a mobile voice communication system in a university hospital.

    Science.gov (United States)

    Hanada, Eisuke; Fujiki, Tadayoshi; Nakakuni, Hideaki; Sullivan, Corbet Vernon

    2006-04-01

    In large hospitals, collaborative clinical practice is currently emphasized, with members of various departments expected to work as a team. The importance of accurate communication among the team members is of utmost importance. To improve such communication, the introduction of mobile voice communication systems has received much attention in Japan. Shimane University Hospital also introduced a Personal Handy-phone System (PHS) for doctors. In the traditional setting, much time was wasted searching for doctors through multiple calls on fixed-line telephones. In order to measure the effectiveness of our system, the change in the number of calls made on fixed-line telephones before and after PHS installation was compared. The total number of calls was reduced by more than 35%, and the number of calls to the wards on weekdays was reduced by half. Mobile telecommunication systems with small output power, such as PHS, are known to cause little interference with medical devices which makes it possible to use mobile voice communication safely in hospitals. The improvement in communication by this systems resulted in an improvement in labor efficiency.

  17. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  18. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  19. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  20. Installation package for a domestic solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    The installation of two prototype solar heating and hot water systems is described. The systems consists of the following subsystems: solar collector, storage, control, transport, and auxiliary energy.

  1. Installation of the multi-packer system for the long-term monitoring of deep groundwater system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyung Su; Bae, Dae Seok; Kim, Chun Soo; Park, Byung Yoon; Koh, Yong Kweon; Kim, Geon Young [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    The groundwater system in the deep geological environment is very important to evaluate the behavior of the radionuclide migration and near-field barrier system. The multi-packer system was installed to derive the long-term change of the groundwater pressure and its quality in the several isolated monitoring zones with depth in the study sites. The monitoring zones were basically determined by the spatial distribution characteristics of the conductive fracture and their hydraulic properties. To recover the natural groundwater condition, the borehole water was purged after completing the installation. From this equipment, the in-situ data will be provided to the radionuclide migration and system development study. 2 refs., 9 figs., 3 tabs. (Author)

  2. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  3. Investigations on installation of the heat exchange system in geothermal wells; Chinetsu koseinai netsukokan system donyu ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The heat exchange system in geothermal wells is a system that replaces the air source heat pump and uses underground beds or groundwater as a heat source to heat rooms by collecting underground heat in winter, and cool rooms in summer by operating a heat media circuit in reverse direction through the action of a reverse flow valve to discharge heat underground. This paper describes feasibility investigations on the system including its technical trend for introducing the system technology. Technological and economic discussions were given by classifying the intra-well heat exchange device in its installation direction (horizontal loop type and vertical installation type), underground heat exchange media (antifreeze solution/water cyclic system and direct expansion system), and underground heat transfer (heat conduction system and heat convection system). As a result of discussing each system, it was concluded that the following two systems are promising: A = vertical installation, antifreeze solution/water cyclic and heat conduction system, and B = vertical installation, antifreeze solution/water cyclic and heat convection system. Since the system B was found to have better efficiency and economy among both systems, it is necessary to verify an intra-well heat exchange system and operation methods that suit the system B effectively. 21 refs., 8 tabs.

  4. High accurate time system of the Low Latitude Meridian Circle.

    Science.gov (United States)

    Yang, Jing; Wang, Feng; Li, Zhiming

    In order to obtain the high accurate time signal for the Low Latitude Meridian Circle (LLMC), a new GPS accurate time system is developed which include GPS, 1 MC frequency source and self-made clock system. The second signal of GPS is synchronously used in the clock system and information can be collected by a computer automatically. The difficulty of the cancellation of the time keeper can be overcomed by using this system.

  5. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  6. Equipment upgrade - Accurate positioning of ion chambers

    International Nuclear Information System (INIS)

    Doane, Harry J.; Nelson, George W.

    1990-01-01

    Five adjustable clamps were made to firmly support and accurately position the ion Chambers, that provide signals to the power channels for the University of Arizona TRIGA reactor. The design requirements, fabrication procedure and installation are described

  7. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  8. How Accurately can we Calculate Thermal Systems?

    International Nuclear Information System (INIS)

    Cullen, D; Blomquist, R N; Dean, C; Heinrichs, D; Kalugin, M A; Lee, M; Lee, Y; MacFarlan, R; Nagaya, Y; Trkov, A

    2004-01-01

    I would like to determine how accurately a variety of neutron transport code packages (code and cross section libraries) can calculate simple integral parameters, such as K eff , for systems that are sensitive to thermal neutron scattering. Since we will only consider theoretical systems, we cannot really determine absolute accuracy compared to any real system. Therefore rather than accuracy, it would be more precise to say that I would like to determine the spread in answers that we obtain from a variety of code packages. This spread should serve as an excellent indicator of how accurately we can really model and calculate such systems today. Hopefully, eventually this will lead to improvements in both our codes and the thermal scattering models that they use in the future. In order to accomplish this I propose a number of extremely simple systems that involve thermal neutron scattering that can be easily modeled and calculated by a variety of neutron transport codes. These are theoretical systems designed to emphasize the effects of thermal scattering, since that is what we are interested in studying. I have attempted to keep these systems very simple, and yet at the same time they include most, if not all, of the important thermal scattering effects encountered in a large, water-moderated, uranium fueled thermal system, i.e., our typical thermal reactors

  9. Installation and commissioning of instantaneous dose rate monitoring system

    CERN Document Server

    Iaydjiev, Plamen

    2018-01-01

    INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users.

  10. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    Science.gov (United States)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  11. Installation of a second trip system

    International Nuclear Information System (INIS)

    Bessada, E.

    1997-01-01

    Since its first criticality in 1957, the NRU reactor has been operating safely and efficiently supporting the CANDU reactor's research and development programs and producing radioisotopes for medical use. To ensure that the reactor continues to operate safely and effectively, Atomic Energy of Canada Limited (AECL) commissioned a team in 1989 to conduct a systematic review and assessment of the reactor condition. The outcome of the study indicated that the overall condition of the reactor is good and that it is being operated safely. The study also produced recommendations as to where safety can be improved. These recommendations are the basis of the upgrade program currently being implemented in the reactor. The Second Trip System (STS) is part of the upgrade program. It is a stand alone seismically qualified trip system that operates independently from the existing first trip system (FST) to shutdown the reactor. This paper discusses the design, installation and the inactive commissioning of the system, and the process used to ensure that the system can be retrofitted to the reactor without affecting its safety or its operational requirements. (author)

  12. Industrial process. Solartron installs the KME measuring and testing system at Civaux

    International Nuclear Information System (INIS)

    Foucher, N.

    1997-01-01

    The Solartron company wined the European call for offer of EdF/CNEPE for the installation of the KME measuring and testing system on the first unit of the Civaux nuclear power plant (France). This system is based on the IMP centralized measurement system, the SNET network and a SNET/ETHERNET interface. Measurement electronic devices are installed in the vicinity of the sensors which reduces the costs and the wires length. Logical and analogical data acquisition is performed by 35 IMP systems which can be connected to 72 different points. The communication with the PATERN data management system is performed by a second independent ETHERNET network. This system ensures the database management and the calculation of the thermodynamical, mechanical and electrical parameters. (J.S.)

  13. Guidelines for safety related telecommunications systems on normally unattended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally unattended offshore installations associated with oil and gas production on the United Kingdom continental shelf. The guidelines are mainly concerned with ensuring that: while the installation is unattended, its operation can be remotely monitored and controlled effectively to prevent the escalation of any abnormal situation; the installation can be safely approached when it is necessary to transfer personnel on board; persons on board, for example for inspection or maintenance activities, are safe. (UK)

  14. Analysis of financial support for photovoltaic system installation with the economic simulation model

    International Nuclear Information System (INIS)

    Imamura, E.; Uchiyama, Y.

    1994-01-01

    The authors developed a penetration method of dispersed generation technologies and tried to investigate economic simulation on photovoltaic systems. The model is composed of several analysis modules; a technology application module, a regional meteorology module, cost modules such as capital cost, power generation cost, marginal cost and avoided cost, and a logistic penetration module. The database management system of application forms, meteorological data, energy demand and equipment costs is also developed to support the model. The main purpose of the study is to make clear impacts to the power supply configuration and cost/benefit effects when PV systems are installed into several different sectors in Japan. The ultimate potential of PV system is 235, 103MWp and its market potential is 15,172 MWp in Japan. Market penetration highly depends on cost learning factors of several components of PV system. The installed capacity with 50% subsidy is 5 times larger than that with 67%. In conclusion, it is feasible for government or utilities to financially support the promotion and installation of PV systems as the electricity supply system

  15. Radiation safety system (RSS) backbones: Design, engineering, fabrication and installation

    International Nuclear Information System (INIS)

    Wilmarth, J.E.; Sturrock, J.C.; Gallegos, F.R.

    1998-01-01

    The Radiation Safety System (RSS) Backbones are part of an electrical/electronic/mechanical system insuring safe access and exclusion of personnel to areas at the Los Alamos Neutron Science Center (LANSCE) accelerator. The RSS Backbones control the safety fusible beam plugs which terminate transmission of accelerated ion beams in response to predefined conditions. Any beam or access fault of the backbone inputs will cause insertion of the beam plugs in the low energy beam transport. The Backbones serve the function of tying the beam plugs to the access control systems, beam spill monitoring systems and current-level limiting systems. In some ways the Backbones may be thought of as a spinal column with beam plugs at the head and nerve centers along the spinal column. The two Linac Backbone segments and experimental area segments form a continuous cable plant over 3,500 feet from beam plugs to the tip on the longest tail. The Backbones were installed in compliance with current safety standards, such as installation of the two segments in separate conduits or tray. Monitoring for ground-faults and input wiring verification was an added enhancement to the system. The system has the capability to be tested remotely

  16. IMIS: Integrated Marine Installation System for offshore turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The report describes a feasibility study on the Integrated Marine Installation System for offshore wind turbines. The aspects covered are (1) Background and why the study is required; (2) Aims and objectives of the project; (3) Summary of methods adopted; (4) Design criteria according to the area for deployment; (5) Conclusions and recommendations. The ultimate goal will be to install and secure the wind turbine in position using an integrated approach to avoid using lifting vessels. To date, an initial feasibility study has been carried out where four different concepts were considered. The next phase of the project will be to address a number of possible risks and constraints before the chosen concept can be demonstrated to be viable. The work is being carried out by Setech Ltd, Armstrong Technology Associates Ltd and Smith Rea Energy Ltd for the DTI.

  17. The modularization construction of piping system installation in AP1000 plant

    International Nuclear Information System (INIS)

    Lu Song; Wang Yuan; Wei Junming

    2012-01-01

    Modularization construction is the main technique used in AP1000 plants, the piping Modularization installation will impact directly to the module construction as the important part of the Modularization construction. After the piping system has took the modularization design in AP1000 plants, some installation works of piping system has moved from the site to fabrication shop. With improving the construction quality and minimizing the time frame of project, the critical paths can be optimized. This paper has analyzed the risk and challenge that met during the modularization construction period of piping systems though introducing the characteristic of modularization construction for AP1000 piping systems, and get construction experiences from the First AP1000 plants in the world, then it will be the firmly basics for the wide application of modularization construction in the future. (authors)

  18. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    International Nuclear Information System (INIS)

    Bocchino, W.M.; Burson, B.

    1997-01-01

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher's ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall

  19. Design and installation of a system of quality for the specialized services of irradiation

    International Nuclear Information System (INIS)

    Rodriguez, Y.; Romero, M.; Castillo, E.; Villoch, A.; Cruz, S.

    1999-01-01

    This study is traced as objective the the design and installation of a System of Quality of agreement to the norm ISO 9002 and the NC-ISO/IEC Guide 25. For this a program was elaborated that it embraced the following phases: organization, installation and maintenance of the system. The elements that would conform the whole program of quality of the irradiation services they would be given from the qualification of the material to process until the certification of the dose imparted to the product; as well as the internal and external control of the quality in the own one installation

  20. Looking beyond installation: Why households struggle to make the most of solar hot water systems

    International Nuclear Information System (INIS)

    Gill, Nicholas; Osman, Peter; Head, Lesley; Voyer, Michelle; Harada, Theresa; Waitt, Gordon; Gibson, Chris

    2015-01-01

    This paper examines household responses to sustainability issues and adoption of energy saving technologies. Our example of solar hot water systems highlights the complexity and variability of responses to low-carbon technologies. While SHW systems have the potential to provide the majority of household hot water and to lower carbon emissions, little research has been done to investigate how SHW systems are integrated into everyday life. We draw on cultural understandings of the household to identify passive and active users of SHW systems and utilize a model that illustrates how technology use is dependent on inter-relations between cultural norms, systems of provision, the material elements of homes, and practice. A key finding is that households can be ill-prepared to make the most of their SHW systems and lack post-installation support to do so. Thus, informed and efficient use of SHW systems is hit and miss. Current policy is largely aimed at subsidizing purchase and installation on the assumption that this is sufficient for emission reduction goals. Our analysis provides evidence to the contrary. Areas we highlight for policy and practice improvement are independent pre-purchase advice, installation quality, and practical guidance on system operation and interaction with patterns of hot water use. - Highlights: • We interview Australian households about their experience with SHW systems. • We identify active and passive users of SHW. Active users tend to be dissatisfied with their system. • Passive users tend to be satisfied but have relatively inefficient systems. • Householders struggle to integrate hot water use and system operation, compromising efficiency. • Policy should encompass pre and post-installation support as much as incentives to install.

  1. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  2. Engineering, installation, testing, and initial operation of the DIII-D Advanced Divertor

    International Nuclear Information System (INIS)

    Andersen, P.M.; Baxi, C.B.; Reis, E.E.; Schaffer, M.J.; Smith, J.P.

    1990-09-01

    The Advanced Divertor (AD) for General Atomics tokamak, DIII-D, was installed in the summer of 1990. The AD has enabled two classes of physics experiments to be run: divertor biasing and divertor baffling. Both are new experiments for DIII-D. The AD has two principal components: (1) a continuous ring electrode; and (2) a toroidally symmetric baffle. The tokamak can be run in bias baffle or standard DIII-D divertor modes by accurate positioning of the outer divertor strike point through the use of the DIII-D control system. The paper covers design, analysis, fabrication, installation, instrumentation, testing, initial operation, and future plans for the Advanced Divertor from an engineering viewpoint. 2 refs., 5 figs

  3. Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, Kristen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Feldman, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ong, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-11-01

    This report presents results from the first U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs—often referred to as “business process” or “soft” costs—for residential and commercial photovoltaic (PV) systems. Annual expenditure and labor-hour-productivity data are analyzed to benchmark 2010 soft costs related to the DOE priority areas of (1) customer acquisition; (2) permitting, inspection, and interconnection; (3) installation labor; and (4) installer labor for arranging third-party financing. Annual expenditure and labor-hour data were collected from 87 PV installers. After eliminating outliers, the survey sample consists of 75 installers, representing approximately 13% of all residential PV installations and 4% of all commercial installations added in 2010. Including assumed permitting fees, in 2010 the average soft costs benchmarked in this analysis total $1.50/W for residential systems (ranging from $0.66/W to $1.66/W between the 20th and 80th percentiles). For commercial systems, the median 2010 benchmarked soft costs (including assumed permitting fees) are $0.99/W for systems smaller than 250 kW (ranging from $0.51/W to $1.45/W between the 20th and 80th percentiles) and $0.25/W for systems larger than 250 kW (ranging from $0.17/W to $0.78/W between the 20th and 80th percentiles). Additional soft costs not benchmarked in the present analysis (e.g., installer profit, overhead, financing, and contracting) are significant and would add to these figures. The survey results provide a benchmark for measuring—and helping to accelerate—progress over the next decade toward achieving the DOE SunShot Initiative’s soft-cost-reduction targets. We conclude that the selected non-hardware business processes add considerable cost to U.S. PV systems, constituting 23% of residential PV system price, 17% of small commercial system price, and 5% of large commercial system price (in 2010

  4. Argonne National Laboratory's photo-oxidation organic mixed waste treatment system - installation and startup testing

    International Nuclear Information System (INIS)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-01-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig

  5. Design and installation of high-temperature ultrasonic measuring system and grinder for nuclear fuel containing trans-uranium elements

    International Nuclear Information System (INIS)

    Serizawa, Hiroyuki; Kikuchi, Hironobu; Iwai, Takashi; Arai, Yasuo; Kurosawa, Makoto; Mimura, Hideaki; Abe, Jiro

    2005-07-01

    A high-temperature ultrasonic measuring system had been designed and installed in a glovebox (711-DGB) to study a mechanical property of nuclear fuel containing trans-uranium (TRU) elements. A figuration apparatus for the cylinder-type sample preparation had also been modified and installed in an established glovebox (142-D). The system consists of an ultrasonic probe, a heating furnace, cooling water-circulating system, a cooling air compressor, vacuum system, gas supplying system and control system. An A/D converter board and an pulsar/receiver board for the measurement of wave velocity were installed in a personal computer. The apparatus was modified to install into the glovebox. Some safety functions were supplied to the control system. The shape and size of the sample was revised to minimize the amount of TRU elements for the use of the measurement. The maximum sample temperature is 1500degC. The performance of the installed apparatuses and the glovebox were confirmed through a series of tests. (author)

  6. Installation and Commissioning of the Helium Refrigeration System for the HANARO-CNS

    International Nuclear Information System (INIS)

    Choi, Jung Woon; Kim, Young Ki; Wu, Sang Ik; Son, Woo Jung

    2009-11-01

    The cold neutron source (CNS), which will be installed in the vertical CN hole of the reflector tank at HANARO, makes thermal neutrons to moderate into the cold neutrons with the ranges of 0.1 ∼ 10 meV passing through a moderator at about 22K. A moderator to produce cold neutrons is liquid hydrogen, which liquefies by the heat transfer with cryogenic helium flowing from the helium refrigeration system. For the maintenance of liquid hydrogen in the IPA, the CNS system is mainly consisted of the hydrogen system to supply the hydrogen to the IPA, the vacuum system to keep the cryogenic liquid hydrogen in the IPA, and the helium refrigeration system to liquefy the hydrogen gas. The helium refrigeration system can be divided into two sections: one is the helium compression part from the low pressure gas to the high pressure gas and the other is the helium expansion part from the high temperature gas and pressure to low temperature and pressure gas by the expansion turbine. The helium refrigeration system except the warm helium pipe and the helium buffer tank has been manufactured by Linde Kryotechnik, AG in Switzerland and installed in the research reactor hall, HANARO. Other components have been manufactured in the domestic company. This technical report deals with the issues, its solutions, and other particular points while the helium refrigeration system was installed at site, verified its performance, and conducted its commissioning along the reactor operation. Furthermore, the operation procedure of the helium refrigeration system is included in here for the normal operation of the CNS

  7. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  8. Tracking the Sun 10: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2017-09-21

    Berkeley Lab’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected, residential and non-residential systems solar photovoltaic (PV) systems in the United States. The present report, the tenth edition in the series, focuses on systems installed through year-end 2016, with preliminary data for the first half of 2017. The report provides an overview of both long-term and more-recent trends, highlighting key drivers for installed price declines over different time horizons. The report also extensively characterizes the widespread variability in system pricing, comparing installed prices across states, market segments, installers, and various system and technology characteristics. The trends described in this report derive from project-level data collected by state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data for this report were compiled and cleaned for more than 1.1 million individual PV systems, though the analysis in the report is based on a subset of that sample, consisting of roughly 630,000 systems with available installed price data. The full underlying dataset of project-level data (excluding any confidential information) is available in a public data file, for use by other researchers and analysts.

  9. Installation of a Wastewater SCADA Monitoring System at Fort Bragg, NC

    National Research Council Canada - National Science Library

    Mullaney, Joe

    2004-01-01

    .... The Wastewater SCADA Monitoring System was installed to monitor 26 remote sites. A detailed radio study of the area verified the feasibility of using radio equipment to transfer data from these sites...

  10. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Al-Haddad, Tristan [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Valdes, Francisco [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Caravati, Kevin [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Goodman, Joseph [Georgia Tech Applied Research Corporation, Atlanta, GA (United States)

    2015-08-27

    The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project. Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the

  11. Design and installation of a multimode microscopy system

    Science.gov (United States)

    Helm, Johannes P.; Haug, Finn-Mogens S.; Storm, Johan F.; Ottersen, Ole-Petter

    2001-04-01

    We describe design and installation of a multi-mode microscopy core facility in an environment of varied research activity in life-sciences. The experimentators can select any combination of a) microscopes (upright, upright fixed-stage, inverted), b) microscopy modes (widefield, DIC, IRDIC, widefield epifluorescence, transmission LSM, reflection and fluorescence CLSM, MPLSM), c) imaging techniques (direct observation, video observation, photography, quantitative camera-recording, flying spot scanning), d) auxiliary systems (equipment for live specimen imaging, electrophysiology, time-coordinated laser-scanning and electrophysiology, patch-clamp). The equipment is installed on one large vibration-isolating optical table (3m X 1.5m X 0.3m). Electronics, auxiliary equipment, and a fiber-coupled, remotely controlled Ar+-Kr+ laser are mounted in a rack system fixed to the ceiling. The design of the shelves allows the head of the CSLM to be moved to any of the microscopes without increasing critical cable lengths. At the same time easy access to all the units is preserved. The beam of a Titanium-Sapphire laser, controlled by means of an EOM and a prism GVD, is coupled directly to the microscopes. Three mirrors mounted on a single precision translation table are integrated into the beam steering system so that the beam can easily be redirected to any of the microscopes. All the available instruments can be operated by the educated and trained user. The system is popular among researchers in neuroanatomy, embryology, cell biology, molecular biology - including the study of protein interactions, e.g. by means of FRET, and electrophysiology. Its colocalization with an EM facility promises to provide considerable synergy effects.

  12. An analysis of file system and installation of the file management system for NOS operating system

    International Nuclear Information System (INIS)

    Lee, Young Jai; Park, Sun Hee; Hwang, In Ah; Kim, Hee Kyung

    1992-06-01

    In this technical report, we analyze NOS file structure for Cyber 170-875 and Cyber 960-31 computer system. We also describe functions, procedure and how-to-operate and how-to-use of VDS. VDS is used to manage large files effectively for Cyber computer system. The purpose of the VDS installation is to increase the virtual disk storage by utilizing magnetic tape, to assist the users of the computer system in managing their files, and to enhance the performance of KAERI Cyber computer system. (Author)

  13. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  14. Accurate conjugate gradient methods for families of shifted systems

    NARCIS (Netherlands)

    Eshof, J. van den; Sleijpen, G.L.G.

    We present an efficient and accurate variant of the conjugate gradient method for solving families of shifted systems. In particular we are interested in shifted systems that occur in Tikhonov regularization for inverse problems since these problems can be sensitive to roundoff errors. The

  15. Predictive parameters of Legionella pneumophila occurrence in hospital water: HPCs and plumbing system installation age.

    Science.gov (United States)

    Ghanizadeh, Ghader; Mirmohamadlou, Ali; Esmaeli, Davoud

    2016-09-01

    Occurrence of Legionella pneumophila can be relevant to the installation age and the presence of heterotrophic plate counts (HPCs). This research illustrates L. pneumophila contamination of hospital water in accordance with the installation age and the presence of HPCs. One hundred and fifty samples were collected from hot and cold water systems and cultured on R2A and BCYE agar. L. pneumophila identification was done via specific biochemical tests. HPCs and L. pneumophila were detected in 96 and 37.3 % of the samples, respectively. The mean of HPCs density was 947 ± 998 CFU/ml; therefore, 52 % of the samples had higher densities than 500 CFU/ml. High densities of HPCs (>500 CFU/ml) led to colonization of L. pneumophila (≥1000 CFU/ml), mainly observed in cooling systems, gynecological, sonography, and NICU wards. Chi(2) test demonstrated that higher densities (>500 CFU/ml) of HPCs and L. pneumophila contamination in cold water were more frequent than warm water (OR: 2.3 and 1.49, respectively). Univariate regressions implied a significant difference between HPCs density and installation age in positive and negative tests of L. pneumophila (OR = 1.1, p installation age on L. pneumophila occurrences (p installation age (r s  = 0.33, p installation age are relevant; so, plumbing system renovation with appropriate materials and promotion of the effective efforts for hospital's water quality assurance is highly recommended.

  16. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  17. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  18. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  19. Building system technology with installation bus. Planning now for the future; Gebaeudesystemtechnik - mit Installationsbus. Heute schon an morgen denken

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, D. [RWE Energie AG, Essen (Germany)

    1995-12-31

    In chapter 16 of the anthology about building technology the building system technology with installation bus is described. The following aspects are discussed: limits of the conventional electric installation, building system technology, building system technology - illusion or reality?; The European Installation Bus Association (EIBA). (BWI) [Deutsch] Kapitel 16 des Sammelbandes ueber Building Control ist dem Thema der Gebaeudesystemtechnik mit Installationsbus gewidmet. In diesem Zusammenhang werden folgende Themenbereiche angesprochen: Grenzen der konventionellen Elektroinstallation; Gebaeudesystemtechnik; Gebaeudesystemtechnik - Illusion oder Realitaet?; Die EIBA (European Installation Bus Association). (BWI)

  20. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  1. Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Darghouth, Naïm [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cates, Sarah [Exeter Associates, Columbia, MD (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2016-08-16

    Now in its ninth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and non-residential systems installed through year-end 2015, with preliminary trends for the first half of 2016. An accompanying LBNL report, Utility-Scale Solar, addresses trends in the utility-scale sector. This year’s report incorporates a number of important changes and enhancements from prior editions. Among those changes, LBNL has made available a public data file containing all non-confidential project-level data underlying the analysis in this report. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. Refer to the text box to the right for several key notes about these data. In total, data were collected and cleaned for more than 820,000 individual PV systems, representing 85% of U.S. residential and non-residential PV systems installed cumulatively through 2015 and 82% of systems installed in 2015. The analysis in this report is based on a subset of this sample, consisting of roughly 450,000 systems with available installed price data.

  2. Installation of laboratory scale flue gas treatment system at ALURTRON, MINT

    International Nuclear Information System (INIS)

    Siti A'iasah Hashim; Khairul Zaman Dahlan; Zulkafli Ghazali; Khomsaton Abu Bakar, Ayub Muhamad

    2002-01-01

    A laboratory scale test rig to treat simulated flue gas using electron beam technology was installed at the Alurtron EB-irradiation center, MINT. The experiment test rig was proposed as a result of a feasibility studies conducted jointly by IAEA, MINT and TNB Research in 1997. The test rig system consisted of several components, among other, diesel generator, gas analyzers and spray cooler. The installation was completed and commissioned in October 2001. Results from the commissioning test runs and subsequent experimental work showed that the efficiency of the gas treatment is high. It was proven that electron beam technology might be applied in the treatment of air pollutants. This paper describes the design and work function of the individual major components as well as the full system function. Results from the initial experimental works are also presented. (Author)

  3. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    Energy Technology Data Exchange (ETDEWEB)

    Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru [Bureya HPP (a JSC RusGidro affiliate) (Russian Federation)

    2016-09-15

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  4. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    International Nuclear Information System (INIS)

    Musyurka, A. V.

    2016-01-01

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  5. Solar space and water heating system installed at Charlottesville, Virginia

    Science.gov (United States)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  6. Real-time POD-CFD Wind-Load Calculator for PV Systems

    Energy Technology Data Exchange (ETDEWEB)

    Huayamave, Victor [Centecorp; Divo, Eduardo [Centecorp; Ceballos, Andres [Centecorp; Barriento, Carolina [Centecorp; Stephen, Barkaszi [FSEC; Hubert, Seigneur [FSEC

    2014-03-21

    The primary objective of this project is to create an accurate web-based real-time wind-load calculator. This is of paramount importance for (1) the rapid and accurate assessments of the uplift and downforce loads on a PV mounting system, (2) identifying viable solutions from available mounting systems, and therefore helping reduce the cost of mounting hardware and installation. Wind loading calculations for structures are currently performed according to the American Society of Civil Engineers/ Structural Engineering Institute Standard ASCE/SEI 7; the values in this standard were calculated from simplified models that do not necessarily take into account relevant characteristics such as those from full 3D effects, end effects, turbulence generation and dissipation, as well as minor effects derived from shear forces on installation brackets and other accessories. This standard does not include provisions that address the special requirements of rooftop PV systems, and attempts to apply this standard may lead to significant design errors as wind loads are incorrectly estimated. Therefore, an accurate calculator would be of paramount importance for the preliminary assessments of the uplift and downforce loads on a PV mounting system, identifying viable solutions from available mounting systems, and therefore helping reduce the cost of the mounting system and installation. The challenge is that although a full-fledged three-dimensional computational fluid dynamics (CFD) analysis would properly and accurately capture the complete physical effects of air flow over PV systems, it would be impractical for this tool, which is intended to be a real-time web-based calculator. CFD routinely requires enormous computation times to arrive at solutions that can be deemed accurate and grid-independent even in powerful and massively parallel computer platforms. This work is expected not only to accelerate solar deployment nationwide, but also help reach the SunShot Initiative goals

  7. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  8. 14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)

    Science.gov (United States)

    2010-01-01

    ... Appendix I to Part 25—Installation of an Automatic Takeoff Thrust Control System (ATTCS) I25.1General. (a... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation of an Automatic Takeoff Thrust...

  9. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  10. Experimental coal dust suppression system installed at the Nikola Tesla thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Guzijan, D [Rudarski Institut, Belgrade (Yugoslavia). Zavod za Ventilaciju i Tehnicku Zastitu

    1988-01-01

    Describes a project conducted at the Nikola Tesla thermal power plant by the Mining Institute of Belgrade to reduce the high levels of dust concentrations in overloading stations on coal conveyors and hoppers. A mathematical model was developed to determine the ventilation capacity required at each of the 18 overloading stations with the hoppers considered successively: empty, 1/3 full, 2/3 full and completely full. Shows how this model enabled an efficient dust suppression system to be developed and subsequently installed by the Termovent company in Belgrade using 4 axial ventilators supplied by the Ventilator Company in Zagreb. The ventilators were powered by means of 5.5 kW electric motors and provided 440 Pa pressure at 950 rpm. Gives the result of dust concentration measurements indicating that the installed system achieved the results predicted by the mathematical model and that the levels were well below the statutory limit. A description of the complete installation is included. 3 refs.

  11. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  12. Installation design of pump motor control systems for supplied of the RSG-GAS secondary raw water cooling system

    International Nuclear Information System (INIS)

    Kiswanto; Teguh Sulistyo; M-Taufik

    2013-01-01

    It has designed already of an installation of the pump motor control system for supplied of raw water to fulfil the RSG-GAS secondary cooling system. The installation design of this plant is used to supply electrical energy from PLN and 3 phase generator to operate the pump motor embedded multilevel type, capacity, Q = 30 m 3 /h; electric power, PN = 4 kW; voltage, 380V/3-/50Hz, and Y connections that can be operated manually or automatically by using the automatic transfer switch. The results obtained recapitulation total load of 4 kW, the magnitude of the nominal current of 9.5 A; kind of safety and capacity are used NFB 16 A, use of this type of cable to the control panel is PLN NYY 6 mm 2 diameter maximum current capacity of 25 A cable and use the control panel to the pump motor cable type NYY 4 mm 2 diameter maximum current capacity of 20 A. The design of the pump motor control system installation is ready to be implemented. (author)

  13. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Science.gov (United States)

    2010-04-01

    ...(a)(1) through (5). (c) Provisions for future installation of electric clothes dryers. When wiring is... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All...

  14. A study on the nuclear computer codes installation and management system

    International Nuclear Information System (INIS)

    Kim, Yeon Seung; Huh, Young Hwan; Kim, Hee Kyung; Kang, Byung Heon; Kim, Ko Ryeo; Suh, Soong Hyok; Choi, Young Gil; Lee, Jong Bok

    1990-12-01

    From 1987 a number of technical transfer related to nuclear power plant had been performed from C-E for YGN 3 and 4 construction. Among them, installation and management of the computer codes for YGN 3 and 4 fuel and nuclear steam supply system was one of the most important project. Main objectives of this project are to establish the nuclear computer code management system, to develop QA procedure for nuclear codes, to secure the nuclear code reliability and to extend techanical applicabilities including the user-oriented utility programs for nuclear codes. Contents of performing the project in this year was to produce 215 transmittal packages of nuclear codes installation including making backup magnetic tape and microfiche for software quality assurance. Lastly, for easy reference about the nuclear codes information we presented list of code names and information on the codes which were introduced from C-E. (Author)

  15. Installation of JMTR core management system

    International Nuclear Information System (INIS)

    Imaizumi, Tomomi; Ide, Hiroshi; Naka, Michihiro; Komukai, Bunsaku; Nagao, Yoshiharu

    2013-01-01

    In order to carry out the core management after the reoperation of JMTR quickly and accurately, the authors took up the Standard Reactor Analysis Code (SRAC) system and core management support programs that are operating in a general-purpose large computer and transferred them to PC (OS: Linux), and newly established a JMTR core management system. As for the core analysis, this measure enabled an increase in the processing speed from the check of core arrangement to the result display of nuclear restriction values to about 60 times, compared with the conventional method. It was confirmed that the differences of calculation results originated from the difference of internal display of computers, associated with the transfer of each analysis code from GS21-400 system to PC-Linux, were within practically allowable level. In the future, this system will be applied to the core analysis of JMTR, as well as to the preparation of operation plans. (A.O.)

  16. A Framework to Survey the Energy Efficiency of Installed Motor Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rao, Prakash; Hasanbeigi, Ali; McKane, Aimee

    2013-08-01

    While motors are ubiquitous throughout the globe, there is insufficient data to properly assess their level of energy efficiency across regional boundaries. Furthermore, many of the existing data sets focus on motor efficiency and neglect the connected drive and system. Without a comprehensive survey of the installed motor system base, a baseline energy efficiency of a country or region’s motor systems cannot be developed. The lack of data impedes government agencies, utilities, manufacturers, distributers, and energy managers when identifying where to invest resources to capture potential energy savings, creating programs aimed at reducing electrical energy consumption, or quantifying the impacts of such programs. This paper will outline a data collection framework for use when conducting a survey under a variety of execution models to characterize motor system energy efficiency within a country or region. The framework is intended to standardize the data collected ensuring consistency across independently conducted surveys. Consistency allows for the surveys to be leveraged against each other enabling comparisons to motor system energy efficiencies from other regions. In creating the framework, an analysis of various motor driven systems, including compressed air, pumping, and fan systems, was conducted and relevant parameters characterizing the efficiency of these systems were identified. A database using the framework will enable policymakers and industry to better assess the improvement potential of their installed motor system base particularly with respect to other regions, assisting in efforts to promote improvements to the energy efficiency of motor driven systems.

  17. System design and installation for RS600 programmable control system for solar heating and cooling

    Science.gov (United States)

    1978-01-01

    Procedures for installing, operating, and maintaining a programmable control system which utilizes a F8 microprocessor to perform all timing, control, and calculation functions in order to customize system performance to meet individual requirements for solar heating, combined heating and cooling, and/or hot water systems are described. The manual discusses user configuration and options, displays, theory of operation, trouble-shooting procedures, and warranty and assistance. Wiring lists, parts lists, drawings, and diagrams are included.

  18. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  19. An automatic system for controlling the quality of straws installed in the ATLAS TRT detector

    CERN Document Server

    Golunov, A O; Gousakov, Yu V; Kekelidze, G D; Livinski, V V; Mouraviev, S V; Parzycki, S S; Peshekhonov, V D; Price, M J; Savenkov, A A

    2004-01-01

    This article describes an automatic system to control the quality of straws installed in the wheels of the end-cap Transition Radiation Tracker of the ATLAS experiment. The system tests both the straightness and the electrical insulation of the straws during installation. The testing time per straw is 9s; consequently it takes about 2h to measure one layer of straws. The off-line analysis takes 20s per straw. With this system defects can be immediately detected and corrected. This clearly influences the future performance of the detector.

  20. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  1. Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naïm R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spears, Mike [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Buckley, Michael [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Grue, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-08-01

    Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and nonresidential systems installed through year-end 2014, with preliminary trends for the first half of 2015. As noted in the text box below, this year’s report incorporates a number of important changes and enhancements. Among those changes, this year's report focuses solely on residential and nonresidential PV systems; data on utility-scale PV are reported in LBNL’s companion Utility-Scale Solar report series. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data were collected for roughly 400,000 individual PV systems, representing 81% of all U.S. residential and non-residential PV capacity installed through 2014 and 62% of capacity installed in 2014, though a smaller subset of this data were used in analysis.

  2. 40 CFR 264.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ..., Partially Buried, or Submerged Liquid Storage Systems,” and the American Petroleum Institute (API... physical damage and excessive stress due to settlement, vibration, expansion, or contraction. [Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615...

  3. Reliability of sprinkler systems. Exploration and analysis of data from nuclear and non-nuclear installations

    International Nuclear Information System (INIS)

    Roenty, V.; Keski-Rahkonen, O.; Hassinen, J.P.

    2004-12-01

    Sprinkler systems are an important part of fire safety of nuclear installations. As a part of effort to make fire-PSA of our utilities more quantitative a literature survey from open sources worldwide of available reliability data on sprinkler systems was carried out. Since the result of the survey was rather poor quantitatively, it was decided to mine available original Finnish nuclear and non-nuclear data, since nuclear power plants present a rather small device population. Sprinklers are becoming a key element for the fire safety in modern, open non-nuclear buildings. Therefore, the study included both nuclear power plants and non-nuclear buildings protected by sprinkler installations. Data needed for estimating of reliability of sprinkler systems were collected from available sources in Finnish nuclear and non-nuclear installations. Population sizes on sprinkler system installations and components therein as well as covered floor areas were counted individually from Finnish nuclear power plants. From non-nuclear installations corresponding data were estimated by counting relevant things from drawings of 102 buildings, and plotting from that sample needed probability distributions. The total populations of sprinkler systems and components were compiled based on available direct data and these distributions. From nuclear power plants electronic maintenance reports were obtained, observed failures and other reliability relevant data were selected, classified according to failure severity, and stored on spreadsheets for further analysis. A short summary of failures was made, which was hampered by a small sample size. From non-nuclear buildings inspection statistics from years 1985.1997 were surveyed, and observed failures were classified and stored on spreadsheets. Finally, a reliability model is proposed based on earlier formal work, and failure frequencies obtained by preliminary data analysis of this work. For a model utilising available information in the non

  4. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  5. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    Science.gov (United States)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  6. Towards cycle-accurate performance predictions for real-time embedded systems

    NARCIS (Netherlands)

    Triantafyllidis, K.; Bondarev, E.; With, de P.H.N.; Arabnia, H.R.; Deligiannidis, L.; Jandieri, G.

    2013-01-01

    In this paper we present a model-based performance analysis method for component-based real-time systems, featuring cycle-accurate predictions of latencies and enhanced system robustness. The method incorporates the following phases: (a) instruction-level profiling of SW components, (b) modeling the

  7. Laser Guided Automated Calibrating System for Accurate Bracket ...

    African Journals Online (AJOL)

    Background: The basic premise of preadjusted bracket system is accurate bracket positioning. ... using MATLAB ver. 7 software (The MathWorks Inc.). These images are in the form of matrices of size 640 × 480. 650 nm (red light) type III diode laser is used as ... motion control and Pitch, Yaw, Roll degrees of freedom (DOF).

  8. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  9. An Electrical Energy Consumption Monitoring and Forecasting System

    Directory of Open Access Journals (Sweden)

    J. L. Rojas-Renteria

    2016-10-01

    Full Text Available Electricity consumption is currently an issue of great interest for power companies that need an as much as accurate profile for controlling the installed systems but also for designing future expansions and alterations. Detailed monitoring has proved to be valuable for both power companies and consumers. Further, as smart grid technology is bound to result to increasingly flexible rates, an accurate forecast is bound to prove valuable in the future. In this paper, a monitoring and forecasting system is investigated. The monitoring system was installed in an actual building and the recordings were used to design and evaluate the forecasting system, based on an artificial neural network. Results show that the system can provide detailed monitoring and also an accurate forecast for a building’s consumption.

  10. Experience in installing a microprocessor-based protection system on a UK nuclear power plant

    International Nuclear Information System (INIS)

    Jones, C.D.; Smith, I.C.

    1993-01-01

    This paper describes a recently completed project to install a microprocessor-based reactor protection system on a twin reactor station in the United Kingdom. This represented the first application of digital technology as part of such a system in the UK. The background of the application and details of the chosen solution are provided. The experience gained during the installation, commissioning and early operation of the equipment is reviewed by the operators. Interactions between the utility and the regulatory body are outlined and the impact of the regulatory process on the utility's resources and the project timescales are discussed

  11. Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Schenkman, Benjamin L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.

  12. Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama

    Science.gov (United States)

    1980-01-01

    The solar energy system installed at the Huntsville Senior Citizen Center is described. Detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are presented.

  13. Licensing system for primary category radioactive installations; Sistema de licenciamiento de instalciones radiactivas de primera categoria

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Riquelme, Angelica Beatriz

    1998-12-31

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission`s Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population`s health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system`s elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author) Dissertation to obtain the degree of Computing and Informatics Engineer; 10 refs., 48 figs., 34 tabs.

  14. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  15. The underwater installation of a drained geomembrane system on Lost Creek Dam

    International Nuclear Information System (INIS)

    Onken, S.; Harlan, R.C.; Wilkes, J.; Vaschetti, G.

    1998-01-01

    Lost Creek Dam was constructed in California around 1923. It is a 122 foot high concrete arch dam with a crest elevation of 3,287 feet and a crest length of 490 feet. Over the years, the dam and the condition of the concrete face have deteriorated. The concrete is porous and seeps water along the entire downstream face. In winter, the seeping water freezes, penetrates the concrete and causes expansion and spalling of the concrete surface. In some places, the concrete has very low strength to a depth of a foot or more, rendering the dam only marginally safe. Seven mitigative measures were identified as possible solutions to the problem. It was determined that the seepage of the water through the concrete dam could be stopped with the installation of a geomembrane to the upstream face. This paper describes the unique underwater installation of a drained geomembrane system on the concrete face of the dam. This was the first ever installation of a drained geomembrane system on an entire dam using divers. Monitoring will determine the success of the project, and whether the seepage of the water through the porous concrete had been reduced sufficiently to stop the deterioration of the concrete on the downstream face. 2 refs., 12 figs

  16. Design, installation and operating experience of 20 photovoltaic medical refrigerator systems on four continents

    Science.gov (United States)

    Hein, G. F.

    1982-01-01

    The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.

  17. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    Science.gov (United States)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  18. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  19. Solar heating and hot water system installed at Cherry Hill, New Jersey

    Science.gov (United States)

    1979-01-01

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  20. Solar heating and hot water system installed at Listerhill, Alabama

    Science.gov (United States)

    1978-01-01

    The Solar system was installed into a new building and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

  1. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  2. The large Debye-Scherrer camera installed at SPring-8 BL02B2 for charge density studies

    CERN Document Server

    Nishibori, E; Kato, K; Sakata, M; Kubota, Y; Aoyagi, S; Kuroiwa, Y; Yamakata, M; Ikeda, N

    2001-01-01

    The design and performance of a large Debye-Scherrer Camera with imaging plate (IP) as a detector, which was very recently installed at SPring-8, BL02B2, is reported. By taking advantage of high beam quality of SPring-8, the camera enables one a rapid collection of a high counting statistics and high angular resolution powder pattern, which can lead to accurate structure analyses. The camera also provides easy access to structural changes at varied temperatures between 15-1000 K. The camera provides a rapid and accurate powder diffraction system utilizing third generation SR.

  3. Installation of the product transport system and control system for the Co-60 irradiator at the Institute of Investigations of the Alimentary Industry (IIIA), La Havana, Cuba

    International Nuclear Information System (INIS)

    Tran Khac An; Le Minh Tuan; Pham Thi Thu Hong; Nguyen Thanh Cuong; Huynh Dong Phuong; Ha Thanh Viet; Truong Vu Thanh Nhan

    2016-01-01

    Under the protocol of international cooperation in science and technology between Vietnam and Cuba - “Installation of the product transport system and control system for the Cobalt-60 irradiator at the Institute of Investigations of the Alimentary Industry (IIIA)”, the renovation of the irradiator has been started since 2012 and carried out by Research and Development Center for Radiation Technology (VINAGAMMA). The renovation work comprises the installation of the tote box transport system that was designed and constructed by Isotope Institute Budapest, Hungary, the installation of the PLC based control system which were designed and constructed by VINAGAMMA, installations of technological systems and training Cuban irradiator operators. The project has been successfully implemented and the industrial Co-60 irradiator with new control system has been put into operation. (author)

  4. Assembly, installation and commissioning of the new halo current sensors system for JET

    International Nuclear Information System (INIS)

    Peruzzo, S.; Fullard, K.; Grando, L.; Huntley, S.; Lam, N.; Pomaro, N.; Riccardo, V.; Sonato, P.

    2007-01-01

    This paper presents the status of the halo current sensors (HCS) diagnostic enhancement project for JET. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, with a total of 24 Rogowski coils and 5 toroidal field pick-up coils. These sensors are meant to provide a measurement of the current flowing through each single tile of the upper dump plate and an estimate of the total poloidal halo current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/2005 shutdown and the acquisition of signals started during the restart phase of the machine in autumn 2005. This paper firstly summarises the critical aspects encountered during the final phase of the procurement of the system and the in-vessel installation, which was accomplished using the remote handling system. The paper then focuses on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns

  5. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage

  6. Solar heating and domestic hot water system installed at North Dallas High School

    Science.gov (United States)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  7. Leader completes installation of process water evaporation system

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-11-01

    The installation of a patent-pending evaporation system at a facility in northeast British Columbia was discussed. The system captures excess waste exhaust heat from natural gas-fired compressor engines and is used to evaporate process water. The disposal of process water is a major cost in the production of natural gas and is usually hauled and disposed at water disposal wells located off-site. The cost to truck and dispose of the water at the facility was estimated at between $30 to $40 per cubic metre. The evaporation system can evaporate 4 to 8 cubic metres of process water every 24 hours and has an estimated useful life of 20 years. The evaporator relies on heat that would otherwise be expelled directly into the atmosphere, and the systems are expected to provide substantial savings. A wide-ranging manufacturing and marketing strategy was expected to commence by the end of 2005. With rising energy prices, operators of facilities are seeking more efficient ways of managing energy needs. The system was created by Leader Energy Services Ltd., a company that provides essential field services for oil and gas well stimulation in Alberta.

  8. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    Energy Technology Data Exchange (ETDEWEB)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  9. The year 2000 embedded systems problem to maintain the safety of nuclear installations

    International Nuclear Information System (INIS)

    Ardisasmita, M.S.

    1999-01-01

    The Y2K problem may impact on nuclear installations in a number of ways because embedded systems are used in nuclear routine operation, monitoring and control system. The very simplest embedded systems are capable of performing only a single function or set of functions to meet a single predetermined purpose. In more complex systems the functioning of the embedded system is determined by an application program that enables the embedded system to be used for a particular purpose in a specific application. The simplest devices consist of a single microprocessor which may itself be packaged with other chips in a hybrid system or Application Specific Integrated Circuit (ASIC). Its input comes from a detector or sensor and its output goes to a switch or activator which may start or stop the operation of a positioning motors or, by operating a valve, may control the flow of cooling system to reactor core. Embedded systems in our organization are also be found in Batan security systems. These include systems for the security of buildings and premises, and in the communication systems on which these depend. In the enclosed paper we demonstrate the use of analytic model and reliability analysis. The subject of this reliability test is to detect the components of the embedded system with PLC's that could fail on Y2K problem in nuclear installation and safety system. (author)

  10. Solar heating and hot water system installed at Alderson Broaddus College, Philippi, West Virginia

    Science.gov (United States)

    1981-01-01

    Data needed necessary to evaluate the design and operation of a solar energy heating and hot water system installed in a commercial application are presented. The information includes system descriptions, acceptance test data, schematics, as built drawing, problems encountered, all solutions and photographs of the system at various stages of completion.

  11. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  12. Radiation protection systems on the TESLA Accelerator Installation

    International Nuclear Information System (INIS)

    Pavlovic, R.

    1996-01-01

    In the Institute of Nuclear sciences VINCA, the Accelerator Installation TESLA which is an medium energy ion accelerator facility consisting of an isochronous cyclotron VINCY, a heavy ion source, a D/H ion source, three low energy and five high energy experimental channels is now under construction. Some problems in defining radiation protection and safety programme, particularly problems in construction appropriate shielding barriers at the Accelerator Installation TESLA are discussed in this paper. (author

  13. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  14. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  15. Assessment of safety of the nuclear installations of the world

    International Nuclear Information System (INIS)

    Thomas, B.A.; Pozniakov, N.; Banga, U.

    1992-01-01

    Incidents and accidents periodically remind us that preventive measures at nuclear installations are not fully reliable. Although sound design is widely recognized to be prerequisite for safe operation, it is not sufficient. An active management that compensates for the weak aspects of the installations design by redundant operational provisions, is the key factor to ensure safe operation. Safety of nuclear installations cannot be assessed on an emotional basis. Since 1986, accurate safety assessment techniques based on an integrated approach to operational safety have been made available by the ASSET services and are applicable to any industrial process dealing with nuclear materials. The ASSET methodology enables to eliminate in advance the Root Causes of the future accidents by introducing practical safety culture principles in the current managerial practices

  16. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  17. Designing, Constructing and Installing a Local Exhaust Ventilation System to Minimize Welders\\' Exposure to Welding Fumes

    Directory of Open Access Journals (Sweden)

    Sajad Zare

    2017-10-01

    Full Text Available Background & Aims of the Study: Welder’s exposure to welding fumes can cause occupational diseases. The current study sought to examine exposure to welding fumes among welders who work in the repair shop of Sarcheshmeh Copper Complex and design a local exhaust ventilation system to control exposure to welding fumes. Materials & Methods: This applied analytical study was conducted in the summer of 2016 among welders working in the repair shop of Sarcheshmeh Copper Complex. The study comprised three phases; in the first one, welders’ exposure to welding fumes was assessed at the beginning of the study. After that, a local exhaust ventilation system was designed and installed in the aforementioned repair shop. In the final stage, welders’ exposure to welding fumes was assessed again after installation of the ventilation system. The procedure recommended by NIOSH (method number 7300 was used for individual sampling of welders. Results: Based on the obtained findings, before installing the ventilation system, welding technicians were exposed to 0.3 mg/m3 of copper fumes and 0.04 mg/m3 of chromium fumes. Journeyman welders were also exposed to 2.16 mg/m3 of manganese fumes, while stellar welders were exposed to 6.9 mg/m3 of iron fumes. In the light of these measurements, a local exhaust ventilation system was designed and installed. Subsequently, measurement of exposure to welding fumes showed a significant reduction. That is, welding technicians were exposed to 0.17 mg/m3 and 0.015 mg/m3 of copper and chromium fumes respectively. Additionally, journeyman welders were exposed to 0.86 mg/m3 of manganese fumes, whereas stellar welders were exposed to 4.3 mg/m3 of iron fumes. Conclusions: A comparison of standard limits of exposure to welding fumes and the results obtained from measurements in sampling stations before and after the installation of the local exhaust ventilation system reveals that this controlling measure was very effective in the

  18. Design and installation of a laboratory-scale system for radioactive waste treatment

    International Nuclear Information System (INIS)

    Berger, D.N.; Knox, C.A.; Siemens, D.H.

    1980-05-01

    Described are the mechanical design features and remote installation of a laboratory-scale radiochemical immobilization system which is to provide a means at Pacific Northwest Laboratory of studying effluents generated during solidification of high-level liquid radioactive waste. Detailed are the hot cell, instrumentation, two 4-in. and 12-in. service racks, the immobilization system modules - waste feed, spray calciner unit, and effluent - and a gamma emission monitor system for viewing calcine powder buildup in the spray calciner/in-can melter

  19. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  20. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L; Machado Filho, Remo Z [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros, Junior, Adory J [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  1. A Highly Accurate Approach for Aeroelastic System with Hysteresis Nonlinearity

    Directory of Open Access Journals (Sweden)

    C. C. Cui

    2017-01-01

    Full Text Available We propose an accurate approach, based on the precise integration method, to solve the aeroelastic system of an airfoil with a pitch hysteresis. A major procedure for achieving high precision is to design a predictor-corrector algorithm. This algorithm enables accurate determination of switching points resulting from the hysteresis. Numerical examples show that the results obtained by the presented method are in excellent agreement with exact solutions. In addition, the high accuracy can be maintained as the time step increases in a reasonable range. It is also found that the Runge-Kutta method may sometimes provide quite different and even fallacious results, though the step length is much less than that adopted in the presented method. With such high computational accuracy, the presented method could be applicable in dynamical systems with hysteresis nonlinearities.

  2. Installations of SNCR on bark-fired boilers

    International Nuclear Information System (INIS)

    Hjalmarsson, A.K.; Hedin, K.; Andersson, Lars

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO x reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO 2 /MJ fuel input and the NO x reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  3. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  4. Management of manufacture and installation of plant pipings by bar code system

    International Nuclear Information System (INIS)

    Suwa, Minoru

    1995-01-01

    As for the piping system of nuclear power plants, the number of parts is very large, and the mill sheet is attached to each part, therefore, it is necessary to manage them individually, and large man power is required. In order to resolve the delay of mechanization in the factory, bar code system was adopted on full scale. At the time of taking parts out from the store, bar code labels are stuck to all piping parts. By this means, all the processes of manufacture and inspection are managed with a computer, and it is useful for labor saving and the prevention of mistaken input. This system is centering around the system of the progress management for piping manufacture, and is operated by being coupled with respective systems of production design, order and inventory, mill sheet management and installation management. The management of production design, manufacture, inspection and installation is explained. There is the problem of sticking bar code labels again as the labels become dirty or parts pass through coating and pickling processes. The direct carving of bar codes on parts by laser marker was tried, and it was successful for stainless steel, but in carbon steel pipes, it was hard to read. It is desirable to develop the bar codes which endure until the end of plant life. (K.I.)

  5. The Application of Systemic Safety for Smaller Nuclear Installations

    International Nuclear Information System (INIS)

    Ward, J.

    2016-01-01

    This paper will provide an outline of ARPANSA’s approach to systemic safety as applied to smaller hazard nuclear installations. It will describe ARPANSA’s effort to enable licence holders to better understand the principles of systemic safety so that they may make improvements for themselves. In regard to human and organizational factors, inspections are more often used to highlight areas where performance can be improved to meet best practice rather than strictly as a compliance tool. This takes account of a graded, risk informed approach and is undertaken in a collaborative way that places a premium on openness, clarity, reliability and efficiency. The paper will discuss the challenges faced by the approach, and how ARPANSA is currently managing these. It will describe ARPANSA’s regulatory guidance and inspection processes. The significant stages in ARPANSA development of the systemic approach are provided briefly in the following paragraphs.

  6. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  7. Finite Element Modelling of a Field-Sensed Magnetic Suspended System for Accurate Proximity Measurement Based on a Sensor Fusion Algorithm with Unscented Kalman Filter.

    Science.gov (United States)

    Chowdhury, Amor; Sarjaš, Andrej

    2016-09-15

    The presented paper describes accurate distance measurement for a field-sensed magnetic suspension system. The proximity measurement is based on a Hall effect sensor. The proximity sensor is installed directly on the lower surface of the electro-magnet, which means that it is very sensitive to external magnetic influences and disturbances. External disturbances interfere with the information signal and reduce the usability and reliability of the proximity measurements and, consequently, the whole application operation. A sensor fusion algorithm is deployed for the aforementioned reasons. The sensor fusion algorithm is based on the Unscented Kalman Filter, where a nonlinear dynamic model was derived with the Finite Element Modelling approach. The advantage of such modelling is a more accurate dynamic model parameter estimation, especially in the case when the real structure, materials and dimensions of the real-time application are known. The novelty of the paper is the design of a compact electro-magnetic actuator with a built-in low cost proximity sensor for accurate proximity measurement of the magnetic object. The paper successively presents a modelling procedure with the finite element method, design and parameter settings of a sensor fusion algorithm with Unscented Kalman Filter and, finally, the implementation procedure and results of real-time operation.

  8. Tennessee Valley Authority becomes first to install digital process protection system

    International Nuclear Information System (INIS)

    Miller, W.; Doyle, J.

    1991-01-01

    Westinghouse Pressurized Water Reactors were originally furnished with analog process protection equipment of various vintages. The older equipment is quickly reaching the point of obsolescence, becoming costly to maintain and operate, its qualification increasingly difficult to achieve. Newer digital-based systems offer improved performance, automatic calibration, and streamlined surveillance test features, as discussed here. For these reasons, the Tennessee Valley Authority installed the world's first digital process protection system, complete with automatic test and calibration features, in its Sequoyah units 1 and 2 last year. The US utility replaced its ageing analog system with Westinghouse Electric's Eagle 21 Process Protection System during a routine maintenance shutdown in a record 23 days. (author)

  9. Testing an Open Source installation and server provisioning tool for the INFN CNAF Tierl Storage system

    International Nuclear Information System (INIS)

    Pezzi, M; Favaro, M; Gregori, D; Ricci, P P; Sapunenko, V

    2014-01-01

    In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.

  10. The electric energy produced by photovoltaic systems connected to the national electric network: own disadvantages taken from the experiences of the systems installed in Guantanamo

    International Nuclear Information System (INIS)

    Mila Raymond, Ramón

    2017-01-01

    The work addresses the experience of installing photovoltaic systems connected to the grid using the available spaces on the roofs of buildings such as the Copextel Territorial Division in Guantánamo, MININT Headquarters and General Teaching Hospital Dr. Agostinho Neto. 36 solar panels of polycrystalline silicon, of 250 Wp for a total of 9KWp, were installed in the Territorial Division of Copextel in Guantánamo with an inverter SB7000 US, generating 2951 KWh in 1071 hours, for an average of 33 KWh daily, were left of Emit 2.47t of CO2 to the atmosphere. In the MININT the installation of 120 photovoltaic modules of monocrystalline silicon and 165Wp, 60 for each inverter SB7000US was carried out and generated until April 3, 8022 KWh in 1166 hours (3.5 months) 76.4 KWh per day and they stopped to emit 8t of CO2. At the General Teaching Hospital Dr. Agustino Neto a 25 kWp system was installed and another 25 KWp system was installed with Sunny Tripower STP25000TL-30 inverters. (author)

  11. The influence of potential exposure to radiation protection system of accelerator installation TESLA

    International Nuclear Information System (INIS)

    Orlic, M.; Cuknic, O.

    2000-01-01

    Potential exposure of individuals at big nuclear machines like Accelerator Installation Tesla (AIT) generates direct requirements to reliability of radiation protection system. Starting from technical characteristics of AlT and international recommendation concerning potential exposure and the probability of death has been calculated. The reference risk has been specified. Comparing then we calculated the probability of the failure of the protective system. The reliability of the system has to be better (author)

  12. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  13. FN-tandem accelerator in Bucharest after the seismic protection system installation

    International Nuclear Information System (INIS)

    Marinescu, L.; Petrascu, M.; Dima, R.; Serban, D.

    1996-01-01

    Subsequent to the installation of the seismic protection system in the HVEC FN-tandem accelerator in Bucharest, observations have been made of the efficiency of the protection devices. Performance and improvements of the new voltage divider are discussed. The SF 6 content of the insulating gas is shown to be conveniently measured using the elastic recoil technique and a robust ioniser heater is described for the HICONEX source. (orig.)

  14. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  15. Feedforward signal prediction for accurate motion systems using digital filters

    NARCIS (Netherlands)

    Butler, H.

    2012-01-01

    A positioning system that needs to accurately track a reference can benefit greatly from using feedforward. When using a force actuator, the feedforward needs to generate a force proportional to the reference acceleration, which can be measured by means of an accelerometer or can be created by

  16. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    Energy Technology Data Exchange (ETDEWEB)

    Andrea Wilkerson, Gregory P Sullivan, Robert G Davis, Sarah Safranek

    2018-04-30

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding the long-term performance of LED lighting systems in high-temperature environments.

  17. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  18. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  19. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  20. Solar hot water system installed at Quality Inn, Key West, Florida

    Science.gov (United States)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  1. The design and installation of Solar Home Systems in rural Cambodia

    Directory of Open Access Journals (Sweden)

    Rebecca Alice Watts

    2016-09-01

    Full Text Available This study contends that solar home systems (SHS are an appropriate solution to provide affordable, reliable and clean electricity in rural Cambodia. SHS provide decentralised electricity suitable for the electricity needs of rural households and with the decreasing cost of solar energy technologies, SHS are becoming an increasingly competitive source of energy. This study details the design and installation of two SHS in a rural community in Cambodia. The SHS have replaced the use of kerosene lamps and supplemented car battery usage, which has generated a cost saving of USD$2.50-3.20 per month. The SHS have increased the hours of quality lighting making it possible for users to improve educational outcomes by studying at night and participating in private education classes as well as potentially extending their working hours that provides an opportunity to increase their income. Community involvement in the installation of SHS and participation in an education program has ensured transfer of knowledge about system operation and maintenance at a local level that has ensured economic, social and environmental were benefits. This study builds a case in support of solar energy at the household level in rural Cambodia and makes recommendations for the deployment of SHS in rural communities throughout the developing world.

  2. Installation of the CDC 7600 supercomputer system in the computer centre in 1972

    CERN Multimedia

    Nettz, William

    1972-01-01

    The CDC 7600 was installed in 1972 in the newly built computer centre. It was said to be the largest and most powerful computer system in Europe at that time and remained the fastest machine at CERN for 9 years. It was replaced after 12 years. Dr. Julian Blake (CERN), Dr. Tor Bloch (CERN), Erwin Gasser (Control Data Corporation), Jean-Marie LaPorte (Control Data Corporation), Peter McWilliam (Control Data Corporation), Hans Oeshlein (Control Data Corporation), and Peter Warn (Control Data Corporation) were heavily involved in this project and may appear on the pictures. William Nettz (who took the pictures) was in charge of the installation. Excerpt from CERN annual report 1972: 'Data handling and evaluation is becoming an increasingly important part of physics experiments. In order to meet these requirements a new central computer system, CDC 7600/6400, has been acquired and it was brought into more or less regular service during the year. Some initial hardware problems have disappeared but work has still to...

  3. An Open-source Meteorological Operational System and its Installation in Portuguese- speaking Countries

    Science.gov (United States)

    Almeida, W. G.; Ferreira, A. L.; Mendes, M. V.; Ribeiro, A.; Yoksas, T.

    2007-05-01

    CPTEC, a division of Brazil’s INPE, has been using several open-source software packages for a variety of tasks in its Data Division. Among these tools are ones traditionally used in research and educational communities such as GrADs (Grid Analysis and Display System from the Center for Ocean-Land-Atmosphere Studies (COLA)), the Local Data Manager (LDM) and GEMPAK (from Unidata), andl operational tools such the Automatic File Distributor (AFD) that are popular among National Meteorological Services. In addition, some tools developed locally at CPTEC are also being made available as open-source packages. One package is being used to manage the data from Automatic Weather Stations that INPE operates. This system uses only open- source tools such as MySQL database, PERL scripts and Java programs for web access, and Unidata’s Internet Data Distribution (IDD) system and AFD for data delivery. All of these packages are get bundled into a low-cost and easy to install and package called the Meteorological Data Operational System. Recently, in a cooperation with the SICLIMAD project, this system has been modified for use by Portuguese- speaking countries in Africa to manage data from many Automatic Weather Stations that are being installed in these countries under SICLIMAD sponsorship. In this presentation we describe the tools included-in and and architecture-of the Meteorological Data Operational System.

  4. Assessing the effects of customer innovativeness, environmental value and ecological lifestyles on residential solar power systems install intention

    International Nuclear Information System (INIS)

    Chen, Kee Kuo

    2014-01-01

    To understand the impact of environmental value, ecological lifestyle, customer innovativeness on customer intention to install solar power system (SPS) in their private houses, an empirical model was proposed. Customer innovativeness was treated as a second-order construct with two first-order dimensions, with each of the latter being measured by means of reflective indicators. Using structural equation modeling, data collected from 203 college students and faculties at a University of Taiwan were tested against the model. We found that environmental value has a positive impact on ecological lifestyle and SPS install intention. Although ecological lifestyle associates positively with SPS install intention, the effect disappears when environmental value is included in the model. The effect of customer innovativeness on SPS install intention results from the tendency of customer novelty seeking, while the impact of customer independent judgment-making on SPS install intention is insignificant. The model explained 76% of the total variations within SPS install intention. Managerial implications for promoting of SPS are considered, and suggestions for further research provided. - Highlights: • We integrate customer innovativeness into an environmental behavior model. • The impact of customer innovativeness on SPS install intention was confirmed. • The impact of novelty seeking on SPS install intention has been found. • Environmental value is the most important factor for SPS install intention. • The model explained 76% of the total variations within SPS install intention

  5. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  6. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    Energy Technology Data Exchange (ETDEWEB)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  7. Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-16

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  8. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  9. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  10. 46 CFR 76.30-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  11. Hot stuff : ultra-high temperature ESP system installed in SAGD wells

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2010-10-15

    Ultra-temperature electrical submersible pumping (ESP) systems have been installed in steam-assisted gravity drainage (SAGD) wells for the first time at a thermal project in Christina Lake, Alberta. The Centrilift XP ESP production system that is being field tested can operate at fluid temperatures reaching 250 degrees C, higher than conventional systems, which is expected to result in an increase in production with a larger steam chamber and less viscous oil at higher steaming temperatures. The more robust system is expected to extend run life and lower operating costs. Years of research and development at specialized testing facilities went into creating the system. The unique testing facilities simulated the horizontal orientation and temperature cycling characteristics of SAGD wells and permitted the system to be tested at temperatures up to 300 degrees C. The new system is expected to lower infrastructure costs for SAGD wells that require high temperatures. 1 fig.

  12. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  13. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  14. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  15. INSTALLING AN ERP SYSTEM WITH A METHODOLOGY BASED ON THE PRINCIPLES OF GOAL DIRECTED PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ioannis Zafeiropoulos

    2010-01-01

    Full Text Available This paper describes a generic methodology to support the process of modelling, adaptation and implementation (MAI of Enterprise Resource Planning Systems (ERPS based on the principles of goal directed project management (GDPM. The proposed methodology guides the project manager through specific stages in order to successfully complete the ERPS implementation. The development of the proper MAI methodology is deemed necessary because it will simplify the installation process of ERPS. The goal directed project management method was chosen since it provides a way of focusing all changes towards a predetermined goal. The main stages of the methodology are the promotion and preparation steps, the proposal, the contract, the implementation and the completion. The methodology was applied as a pilot application by a major ERPS development company. Important benefits were the easy and effective guidance for all installation and analysis stages, the faster installation for the ERPS and the control and cost reduction for the installation, in terms of time, manpower, technological equipment and other resources.

  16. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  17. Some mathematical aspects of creation of the control system for a physical installation

    International Nuclear Information System (INIS)

    Efimov, K.M.; Efimova, T.E.; Zagurskij, A.B.

    1988-01-01

    The article presented is a result of investigations connected to the problems of the software creation for the linear accelerator automatic control system. The problems considered arise before each scientific group engaged in the development of the automatic control complex for a physical installation. The possible ways of solving such problems are discussed

  18. Security of a nuclear material in an installation is determined by how far the installation is to assure that nuclear material remains at a predetermined location

    International Nuclear Information System (INIS)

    Djoko Hari Nugroho

    2010-01-01

    This paper observed a preliminary design on nuclear material tracking system in the installation for decision making support based on multi sensor fusion that is reliable and accurate to ensure that the nuclear material remains inside the control area. Capability on decision making in the Management Information System is represented by an understanding of perception in the third level of abstraction. The second level will be achieved with the support of image analysis and organizing data. The first level of abstraction is constructed by merger between several CCD camera sensors distributed in a building in a data fusion representation. Data fusion is processed based on Wavelett approach. Simulation utilizing Matlab programming shows that Wavelett fuses multi information from sensors as well. Hope that when the nuclear material out of control regions which have been predetermined before, there will arise a warning alarm and a message in the Management Information System display. Thus the nuclear material movement time event can be obtained and tracked as well. (author)

  19. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  20. Evaluation of a reverberation enhancement system installed in a small multi purpose hall

    DEFF Research Database (Denmark)

    Gade, Anders Christian

    1997-01-01

    After design and installation of a reverberation enhancement system in new 400 seat multi purpose hall in Vejle, Denmark. room acoustic measurements and listening tests were performed in order to reveal the objective and subjective performance and limits of such a powerful tool for altering ''room...... acoustic'' properties. The compromises in realistic choice of acoustic parameters for the different settings of the system are described with reference to the natural acoustics and functional needs of the hall in question. Although the enhancement system is capable of increasing the reverberation time...

  1. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  2. Optical analysis of a photovoltaic V-trough system installed in western India.

    Science.gov (United States)

    Maiti, Subarna; Sarmah, Nabin; Bapat, Pratap; Mallick, Tapas K

    2012-12-20

    The low concentrating photovoltaic (PV) system such as a 2× V-trough system can be a promising choice for enhancing the power output from conventional PV panels with the inclusion of thermal management. This system is more attractive when the reflectors are retrofitted to the stationary PV panels installed in a high aspect ratio in the north-south direction and are tracked 12 times a year manually according to preset angles, thus eliminating the need of diurnal expensive tracking. In the present analysis, a V-trough system facing exactly the south direction is considered, where the tilt angle of the PV panels' row is kept constant at 18.34°. The system is installed on the terrace of CSIR-Central Salt and Marine Chemicals Research Institute in Bhavnagar, Gujarat, India (21.47 N, 71.15 E). The dimension of the entire PV system is 9.64 m×0.55 m. The V-troughs made of anodized aluminum reflectors (70% specular reflectivity) had the same dimensions. An in-house developed; experimentally validated Monte Carlo ray-trace model was used to study the effect of the angular variation of the reflectors throughout a year for the present assembly. Results of the ray trace for the optimized angles showed the maximum simulated optical efficiency to be 85.9%. The spatial distribution of solar intensity over the 0.55 m dimension of the PV panel due to the V-trough reflectors was also studied for the optimized days in periods that included solstices and equinoxes. The measured solar intensity profiles with and without the V-trough system were used to calculate the actual optical efficiencies for several sunny days in the year, and results were validated with the simulated efficiencies within an average error limit of 10%.

  3. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  4. Method and system for installing a layered vessel on location

    International Nuclear Information System (INIS)

    Pechacek, R.E.; Clay, E.J.

    1982-01-01

    A method and system for installing a layered vessel wherein the method includes the steps of constructing the bottom vessel head section in an inverted position mounting the bottom head section on the vessel foundation, erecting a generally cylindrical construction frame having a plurality of annular work stations; substantially simultaneously with the erection of the cylindrical construction frame, constructing onto the bottom head a cylindrical inside shell liner and a hemispherical upper head inside liner and adding layers to the inside shell from the bottom upwardly with the addition of such layers occurring substantially simultaneously at various of the annular work stations. A system for accomplishing these steps is provided, including particular method for constructing the bottom head, and further, an annularly movable crane assembly is provided for the work stations. (author)

  5. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    Science.gov (United States)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  6. The calibration procedure of the radiation monitoring system installed in radiation controlled area of KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sung-Kyun; Min, Yi-Sub; Park, Jeong-Min; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2016-10-15

    The spaces, where these accelerators are installed, are defined as the radiation controlled area and the levels of the radiation in this area are monitored by the radiation monitoring system (RMS) to protect radiation workers and experiment users from the hazards of the ionizing radiation and the surface and air contamination tests are carried out periodically by the radiation secure team. The most of RMS instruments are installed in the accelerator building, where the 100-MeV proton linear accelerator is installed. All detectors of RMS should be calibrated every year to prove the reliability of RMS and almost all instruments for RMS was calibrated during this summer maintenance period of KOMAC this year. Almost all RMS instruments installed in KOMAC is calibrated between 2016-07-13 and 2016-08-24. As the calibration result, if the current reading value are within the 5% of the reference dose rate value, this RMS instrument can be used one more year. Otherwise, the detector of that RMS instrument should be repaired or replaced. The self-calibration certificate for each RMS instrument will be published only for the instrument to satisfy the condition.

  7. Analysis of Marine Corps Renewable Energy Planning to Meet Installation Energy Security Requirements

    Science.gov (United States)

    2013-12-03

    monitoring grid interruptions at each installation and their impact on operations. Collecting interruption data will assist in obtaining an accurate...zero energy status is within reach if Miramar implements the recommended measures, replaces all remaining natural gas with biogas , and completely

  8. A TDR-based system for the localization of leaks in newly installed, underground pipes made of any material

    International Nuclear Information System (INIS)

    Cataldo, A; Cannazza, G; De Benedetto, E; Giaquinto, N

    2012-01-01

    In this paper, a time domain reflectometry-based system for locating leaks in underground pipes (made of any material) is presented. The proposed system simply requires that a biwire should be attached to the pipe (all along its length), at the time of installation. Basically, the biwire acts as a permanent sensing element that can be connected to the measurement instrument whenever it is necessary to check for the presence of leaks. It is worth emphasizing that such a simple and low-cost system could tremendously facilitate leak detection not only in water distribution systems but also in wastewater/sewer pipelines. The proposed system was validated through measurements on a newly installed pilot plant, in which a leak was intentionally provoked. (paper)

  9. Radiation protection system installation for the accelerator production of tritium/low energy demonstration accelerator project (APT/LEDA)

    CERN Document Server

    Wilmarth, J E; Tomei, T L

    2000-01-01

    The APT/LEDA personnel radiation protection system installation was accomplished using a flexible, modular proven system which satisfied regulatory orders, project design criteria, operational modes, and facility requirements. The goal of providing exclusion and safe access of personnel to areas where prompt radiation in the LEDA facility is produced was achieved with the installation of a DOE-approved Personnel Access Control System (PACS). To satisfy the facility configuration design, the PACS, a major component of the overall radiation safety system, conveniently provided five independent areas of personnel access control. Because of its flexibility and adaptability the Los-Alamos Neutron- Science-Center-(LANSCE)-designed Radiation Security System (RSS) was efficiently configured to provide the desired operational modes and satisfy the APT/LEDA project design criteria. The Backbone Beam Enable (BBE) system based on the LANSCE RSS provided the accelerator beam control functions with redundant, hardwired, ta...

  10. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  11. What is stopping you from installing solar systems? Contrasting Chilean with German homes.

    Science.gov (United States)

    Haas, J.; Caro Castro, C. P.

    2017-12-01

    Towards meeting Paris` climate change goals, a rapid shift towards clean energy sources is needed. While the deployment of centralized solar photovoltaic (PV) power plants has been remarkable in Germany and -in the last years- also in Chile, the residential PV installations in Chile lag greatly in contrast to Germany. In fact, Chile's largest PV system until 2012 was smaller than 25 kW. And, although the recently implemented net-billing scheme has brightened this scenario, most of Chile's roofs keep being bald. Beyond the evident economic contrasts among both countries, there are many other underlying differences in public acceptance of renewable technologies. Understanding them is of both conceptual and practical importance. Here, we study the variables that determine the public acceptance of residential PV systems in Germany and Chile. We survey the positions of laypersons on the support of climate change goals, on the necessity of renewable technologies, on their auto-sustainability (how much I identify myself with being sustainable), and on their auto-effectiveness (do I believe that my behavior has impact on global targets). The sample is further characterized by socioeconomic status, knowledge and experience and proximity to solar systems, esthetic perception of the systems, security of the neighborhood and house ownership, willingness of installing solar systems, and trust in the technology. We identify the main factors via data correlation analysis. From our findings, actions to improve the acceptance and literacy of solar technologies in Chile can be derived.

  12. 46 CFR 76.25-35 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  13. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    International Nuclear Information System (INIS)

    WHITE, W.F.

    1999-01-01

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services

  14. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  15. Installation and early operation of a complex low inventory cryogenic distillation system for the Princeton TFTR

    International Nuclear Information System (INIS)

    Busigin, A.; Busigin, C.J.; Robins, J.R.; Woodall, K.B.; Bellamy, D.G.; Fong, C.; Kalyanam, K.; Sood, S.K.

    1995-01-01

    A low inventory Tritium Purification System (TPS) has just been installed at the Princeton Plasma Physics Laboratory (PPPL). The TPS was designed specifically for PPPL, based on their specifications for exhaust gases. The generic design, however, can easily be modified to accept a large variety of input conditions. The Princeton system is designed to have a total tritium inventory of approximately 0.5 g while producing pure product streams consisting of H 2 , D 2 , and T 2 . The purpose of the system is to separate and recycle unburnt tritium from the TFTR and to produce hydrogen and deuterium streams that are free of tritium. These streams can be disposed by stacking, thus eliminating the need to create large volume waste streams that are contaminated with tritium and that must be managed for permanent disposal. This paper will discuss the installation, the modifications and preliminary results of operation of this system at Princeton. 2 refs., 3 figs

  16. An integrated management system to improve the performance of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Beckmerhagen, I.A.; Berg, H.P. [Bundesamt fur Strahlenschutz, Salzgitter (Germany)

    2001-07-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  17. An integrated management system to improve the performance of nuclear installations

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2001-01-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  18. 14 CFR 27.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...

  19. 14 CFR 29.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...

  20. 14 CFR 25.967 - Fuel tank installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...

  1. Cooling performance of a vertical ground-coupled heat pump system installed in a school building

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yujin; Lee, Jae-Keun; Jeong, Young-Man; Koo, Kyung-Min [Department of Mechanical Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea); Lee, Dong-Hyuk; Kim, In-Kyu; Jin, Sim-Won [LG Electronics, 391-2 Gaeumjeong-dong, Changwon City, Gyeongnam (Korea); Kim, Soo H. [Department of Nanosystems and Nanoprocess Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea)

    2009-03-15

    This paper presents the cooling performance of a water-to-refrigerant type ground heat source heat pump system (GSHP) installed in a school building in Korea. The evaluation of the cooling performance has been conducted under the actual operation of GSHP system in the summer of year 2007. Ten heat pump units with the capacity of 10 HP each were installed in the building. Also, a closed vertical typed-ground heat exchanger with 24 boreholes of 175 m in depth was constructed for the GSHP system. To analyze the cooling performance of the GSHP system, we monitored various operating conditions, including the outdoor temperature, the ground temperature, and the water temperature of inlet and outlet of the ground heat exchanger. Simultaneously, the cooling capacity and the input power were evaluated to determine the cooling performance of the GSHP system. The average cooling coefficient of performance (COP) and overall COP of the GSHP system were found to be {proportional_to}8.3 and {proportional_to}5.9 at 65% partial load condition, respectively. While the air source heat pump (ASHP) system, which has the same capacity with the GSHP system, was found to have the average COP of {proportional_to}3.9 and overall COP of {proportional_to}3.4, implying that the GSHP system is more efficient than the ASHP system due to its lower temperature of condenser. (author)

  2. Installation of a bio-venting remediation system using directionally drilled horizontal wells

    International Nuclear Information System (INIS)

    Hardy, L.; Stolz, A.P.

    1997-01-01

    The installation of a remediation system for off-site contamination was discussed. The site was contaminated with gasoline and diesel from an abandoned bulk fuel storage and distribution terminal located near a highway. The dissolved phase hydrocarbon plume extended beneath several houses down gradient of the site. Bioventing was considered to be the only remediation option to recover the liquid phase hydrocarbons beneath the highway in a way that would satisfy all the clean-up objectives and the design constraints. Bioventing is closely related to soil vapour extraction (SVE). The main difference is that in bioventing, the mechanism for removal of contaminants is bio-degradation by indigenous bacteria, whereas in SVE, contaminants are simply removed by volatilization. Bioventing systems enhance the activity of the indigenous bacteria by inducing air flow in the subsurface through the use of vapour injection or extraction wells. Two horizontal vapour extraction wells were installed with a directional drill. A soil pile was utilized as a bio-filter for the extracted hydrocarbon vapours and a backfilled trench was used to inject vapours recovered from the soil pile to the subsurface. The total mass of hydrocarbons degraded by this system in 230 days was estimated to be 1,000 kg. It was concluded that under appropriate conditions the in-situ treatment of contaminated soil using directionally drilled wells can be justified on both economic and technical grounds. 3 refs., 1 tab., 5 figs

  3. An Accurate Gaussian Process-Based Early Warning System for Dengue Fever

    OpenAIRE

    Albinati, Julio; Meira Jr, Wagner; Pappa, Gisele Lobo

    2016-01-01

    Dengue fever is a mosquito-borne disease present in all Brazilian territory. Brazilian government, however, lacks an accurate early warning system to quickly predict future dengue outbreaks. Such system would help health authorities to plan their actions and to reduce the impact of the disease in the country. However, most attempts to model dengue fever use parametric models which enforce a specific expected behaviour and fail to capture the inherent complexity of dengue dynamics. Therefore, ...

  4. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  5. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  6. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  7. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  8. Global search tool for the Advanced Photon Source Integrated Relational Model of Installed Systems (IRMIS) database

    International Nuclear Information System (INIS)

    Quock, D.E.R.; Cianciarulo, M.B.

    2007-01-01

    The Integrated Relational Model of Installed Systems (IRMIS) is a relational database tool that has been implemented at the Advanced Photon Source to maintain an updated account of approximately 600 control system software applications, 400,000 process variables, and 30,000 control system hardware components. To effectively display this large amount of control system information to operators and engineers, IRMIS was initially built with nine Web-based viewers: Applications Organizing Index, IOC, PLC, Component Type, Installed Components, Network, Controls Spares, Process Variables, and Cables. However, since each viewer is designed to provide details from only one major category of the control system, the necessity for a one-stop global search tool for the entire database became apparent. The user requirements for extremely fast database search time and ease of navigation through search results led to the choice of Asynchronous JavaScript and XML (AJAX) technology in the implementation of the IRMIS global search tool. Unique features of the global search tool include a two-tier level of displayed search results, and a database data integrity validation and reporting mechanism.

  9. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric

  10. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  11. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  12. Integration Tests of the Muon System

    CERN Multimedia

    Cerutti, F; Palestini, S

    A complex large-size prototype of the Muon system is installed in the test area H8B in Prévessin; the set-up includes chambers belonging to the three layers of the Barrel Spectrometer (on the right in Figure 1), and chambers belonging to one octant of the End Cap Spectrometer (center and left side of Figure 1). Figure 1: Set-up of the Muon spectrometer integration test. The installation accurately reproduces the geometry of regions of the ATLAS Muon Spectrometer, with the H8 beam-line crossing the detectors at positions/angles corresponding to particles with polar angle of 75 ± 4 and 15 ± 4 degrees, respectively for the Barrel and the End Cap. A comprehensive test program is being carried out with this set-up, ranging from tests of support frames (octant of the MDT BigWheel and of the SmallWheel) and of handling/installation of tracking chambers, to real-size tests of the alignment systems, together with accurate studies of performance and calibration of the precision chambers, and with develo...

  13. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  14. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  15. Analysis of normative requirements for the development and implementation of a quality management system in Brazilian nuclear installations and activities

    International Nuclear Information System (INIS)

    Kibrit, Eduardo

    2008-01-01

    The present work identifies, characterizes and analyses the normative requirements for the development and implementation of quality management systems in Brazilian nuclear installations and activities. The requirements established in standards IAEA GS-R-3, IAEA GS-G-3.1, IAEA DS 349, NBR ISO 9001:2000 e CNEN-NN-1.16 are critically analyzed. A correlation matrix of the applicable standards is presented and the related topics among them are identified. The standards IAEA GS-R-3, IAEA GS-G-3.1 and IAEA DS 349 define general requirements for establishing, implementing, assessing and continually improving an integrated management system in nuclear installations and activities, in IAEA member countries. The standard NBR ISO 9001:2000 establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard CNEN NN-1.16 establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The standard IAEA GS-R-3 that replaces the code IAEA 50-C-Q introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concepts of 'Quality Assurance' and 'Quality Management'. This new approach is aligned with the current tendency incorporating requirements of quality, safety, health, environment, security, economics and other in a unique management system. Examples of quality management systems implemented by Brazilian nuclear organizations and by nuclear organizations outside Brazil are analyzed and considered in the discussion of results. (author)

  16. Accurate Vehicle Location System Using RFID, an Internet of Things Approach

    Science.gov (United States)

    Prinsloo, Jaco; Malekian, Reza

    2016-01-01

    Modern infrastructure, such as dense urban areas and underground tunnels, can effectively block all GPS signals, which implies that effective position triangulation will not be achieved. The main problem that is addressed in this project is the design and implementation of an accurate vehicle location system using radio-frequency identification (RFID) technology in combination with GPS and the Global system for Mobile communication (GSM) technology, in order to provide a solution to the limitation discussed above. In essence, autonomous vehicle tracking will be facilitated with the use of RFID technology where GPS signals are non-existent. The design of the system and the results are reflected in this paper. An extensive literature study was done on the field known as the Internet of Things, as well as various topics that covered the integration of independent technology in order to address a specific challenge. The proposed system is then designed and implemented. An RFID transponder was successfully designed and a read range of approximately 31 cm was obtained in the low frequency communication range (125 kHz to 134 kHz). The proposed system was designed, implemented, and field tested and it was found that a vehicle could be accurately located and tracked. It is also found that the antenna size of both the RFID reader unit and RFID transponder plays a critical role in the maximum communication range that can be achieved. PMID:27271638

  17. Accurate Vehicle Location System Using RFID, an Internet of Things Approach.

    Science.gov (United States)

    Prinsloo, Jaco; Malekian, Reza

    2016-06-04

    Modern infrastructure, such as dense urban areas and underground tunnels, can effectively block all GPS signals, which implies that effective position triangulation will not be achieved. The main problem that is addressed in this project is the design and implementation of an accurate vehicle location system using radio-frequency identification (RFID) technology in combination with GPS and the Global system for Mobile communication (GSM) technology, in order to provide a solution to the limitation discussed above. In essence, autonomous vehicle tracking will be facilitated with the use of RFID technology where GPS signals are non-existent. The design of the system and the results are reflected in this paper. An extensive literature study was done on the field known as the Internet of Things, as well as various topics that covered the integration of independent technology in order to address a specific challenge. The proposed system is then designed and implemented. An RFID transponder was successfully designed and a read range of approximately 31 cm was obtained in the low frequency communication range (125 kHz to 134 kHz). The proposed system was designed, implemented, and field tested and it was found that a vehicle could be accurately located and tracked. It is also found that the antenna size of both the RFID reader unit and RFID transponder plays a critical role in the maximum communication range that can be achieved.

  18. Accurate Vehicle Location System Using RFID, an Internet of Things Approach

    Directory of Open Access Journals (Sweden)

    Jaco Prinsloo

    2016-06-01

    Full Text Available Modern infrastructure, such as dense urban areas and underground tunnels, can effectively block all GPS signals, which implies that effective position triangulation will not be achieved. The main problem that is addressed in this project is the design and implementation of an accurate vehicle location system using radio-frequency identification (RFID technology in combination with GPS and the Global system for Mobile communication (GSM technology, in order to provide a solution to the limitation discussed above. In essence, autonomous vehicle tracking will be facilitated with the use of RFID technology where GPS signals are non-existent. The design of the system and the results are reflected in this paper. An extensive literature study was done on the field known as the Internet of Things, as well as various topics that covered the integration of independent technology in order to address a specific challenge. The proposed system is then designed and implemented. An RFID transponder was successfully designed and a read range of approximately 31 cm was obtained in the low frequency communication range (125 kHz to 134 kHz. The proposed system was designed, implemented, and field tested and it was found that a vehicle could be accurately located and tracked. It is also found that the antenna size of both the RFID reader unit and RFID transponder plays a critical role in the maximum communication range that can be achieved.

  19. Accurate and Simple Calibration of DLP Projector Systems

    DEFF Research Database (Denmark)

    Wilm, Jakob; Olesen, Oline Vinter; Larsen, Rasmus

    2014-01-01

    does not rely on an initial camera calibration, and so does not carry over the error into projector calibration. A radial interpolation scheme is used to convert features coordinates into projector space, thereby allowing for a very accurate procedure. This allows for highly accurate determination...

  20. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  1. Laser ionization installation for measurement of atomic beam parameters

    CERN Document Server

    Tukhlibaev, O; Khalilov, E E; Alimov, U Z

    2002-01-01

    The design of the laser ionization installation for determination of the atomic beam intensity, density and spatial structure is described. The method of the atoms laser resonance staged photoionization is applied in the installation. The above installation consists of two lasers on the dyestuffs, the atomizer, the ionization system and the ion signals registration system. The results of studies on the spatial structure of the In atoms beam are presented. The proposed method provides for the spatial resolution at the level of 10-100 mu m

  2. A database system for the control of radioactive effluents generated by the IPEN-CNEN/SP installations

    International Nuclear Information System (INIS)

    Maduar, M.F.

    1992-01-01

    A PC-compatible database system has been developed in order to optimize the control of liquid and gaseous effluents generated by the installations of IPEN-CNEN/SP. The system implements source-term generation, optimizes the discharge control of the effluents and allows several ways for the retrieval of data concerning to the effluents. (author)

  3. Recommendation System Based On Association Rules For Distributed E-Learning Management Systems

    Science.gov (United States)

    Mihai, Gabroveanu

    2015-09-01

    Traditional Learning Management Systems are installed on a single server where learning materials and user data are kept. To increase its performance, the Learning Management System can be installed on multiple servers; learning materials and user data could be distributed across these servers obtaining a Distributed Learning Management System. In this paper is proposed the prototype of a recommendation system based on association rules for Distributed Learning Management System. Information from LMS databases is analyzed using distributed data mining algorithms in order to extract the association rules. Then the extracted rules are used as inference rules to provide personalized recommendations. The quality of provided recommendations is improved because the rules used to make the inferences are more accurate, since these rules aggregate knowledge from all e-Learning systems included in Distributed Learning Management System.

  4. Design basis and requirements for 241-SY modular exhauster mechanical installation

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1994-01-01

    A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ''T'' to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort

  5. Remote inspection system for components installed inside a primary containment vessel of a boiling water reactor

    International Nuclear Information System (INIS)

    Shimizu, Katsutoshi; Kawai, Katsumi; Ito, Takahiko; Hashimoto, Yuji; Tomizawa, Fumio.

    1983-01-01

    A remote operation type monitoring system was developed to always enable the watching of the condition of the main equipment installed in the containment vessels of BWRs. It comprises four inspection vehicles suspended by a monorail and pulled with trolley chain, coaxial cables for signal transmission and power supply, and control system. On the inspection vehicles, a television camera, a thermometer, a microphone and a radiation dose rate meter are installed. The performance of the system was confirmed at 60 deg C for several months. Thereafter, the field test was carried out in the Tokai No. 2 Power Station, Japan Atomic Power Co., from December, 1980, to September, 1981. By the continuous monitoring and grasp of operational condition, the preventive maintenance and the improvement of the rate of operation can be expected. Also it is desirable in view of the reduction of radiation exposure of operators. The mechanization of and the labor saving in inspection and maintenance works is necessary because skilled workers will be short. The design and the composition of the system and its tests are reported. (Kako, I.)

  6. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  7. Solar heating and hot water system installed at Saint Louis, Missouri

    Science.gov (United States)

    1980-01-01

    The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  8. Battery Management Systems: Accurate State-of-Charge Indication for Battery-Powered Applications

    NARCIS (Netherlands)

    Pop, V.; Bergveld, H.J.; Danilov, D.; Regtien, Paulus P.L.; Notten, P.H.L.

    2008-01-01

    Battery Management Systems – Universal State-of-Charge indication for portable applications describes the field of State-of-Charge (SoC) indication for rechargeable batteries. With the emergence of battery-powered devices with an increasing number of power-hungry features, accurately estimating the

  9. Thermal solar energy. Collective domestic hot water installations

    International Nuclear Information System (INIS)

    Garnier, Cedric; Chauvet, Chrystele; Fourrier, Pascal

    2016-01-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic outlook on the way to complete the installation of a collective domestic water solar heating system. After some recall of what is solar energy, the thermal solar technology and the energy savings it may induce, this document presents the main hydraulic configurations of a solar heating system with water storage, the dimensioning of a solar water heating system and its cost estimation, the installation and the commissioning of the system, the monitoring and maintenance operations

  10. Preliminary design for spent fuel canister handling systems in a canister transfer and installation vehicle

    International Nuclear Information System (INIS)

    Wendelin, T.; Suikki, M.

    2008-12-01

    The report presents a spent fuel canister transfer and installation vehicle. The vehicle is used for carrying the fuel canister into a disposal tunnel and installing it into a deposition hole. The report outlines basic requirements and a design for canister handling equipment used in a canister transfer and installation vehicle, a description regarding the operation and maintenance of the equipment, as well as a cost estimate. Specific vehicles will be manufactured for all canister types in order to minimize the height of the disposal tunnels. This report is only focused on a transfer and installation vehicle for OL1-2 fuel canisters. Detailed designing and selection of final components have not yet been carried out. The report also describes the vehicle's requirements for the structures of a repository system, as well as actions in possible malfunction or fault situations. The spent fuel canister is brought from an encapsulation plant by a canister lift down to the repository level. The fuel canister is driven from the canister lift by an automated guided vehicle onto a canister hoist at a canister loading station. The canister transfer and installation vehicle is waiting for the canister with its radiation shield in an upright position above the canister hoist. The hoist carries the canister upward until the vehicle's own lifting means grab hold of the canister and raise it up into the vehicle's radiation shield. This is followed by turning the radiation shield to a transport position and by closing it in a radiation-proof manner against a rear radiation shield. The vehicle is driven along the central tunnel into the disposal tunnel and parked on top of the deposition hole. The vehicle's radiation shield is turned to the upright position and the canister is lowered with the vehicle's hydraulic winches into a bentonite-lined deposition hole. The radiation shield is turned back to the transport position and the vehicle can be driven out of the disposal tunnel

  11. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  12. AUTOMOTIVE DIESEL MAINTENACE 1. UNIT XV, I--MAINTAINING THE COOLING SYSTEM, CUMMINS DIESEL ENGINE, I--UNIT INSTALLATION--TRANSMISSION.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND THE PROCEDURES FOR TRANSMISSION INSTALLATION. TOPICS ARE (1) IMPORTANCE OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) EVALUATING COOLING SYSTEM FAILURES, (4) CARING FOR THE COOLING SYSTEM,…

  13. Development and installation of solution measurement and monitoring system (SMMS) at TRP

    International Nuclear Information System (INIS)

    Satoh, Takehiko; Yamanaka, Atsushi; Kashimura, Takao; Yamamoto, Tokuhiro

    2001-01-01

    The IAEA proposed TRP safeguard improvement plants in 1995 for closer and more efficient safeguards of TRP. Development of Solution Measurement and Monitoring System (SMMS) is one item of the plans and has been carried out under the JASPAS program as JA-6. Following to the IAEA's acceptance test, after the installation of the SMMS in 1999, field test of this system has been carried out. The main purpose of the SMMS is to establish the IAEA's independent monitoring system. Besides input and output accountability tanks, seven Pu storage tanks and a pot attached to the Pu storage tanks are monitored continuously, and solution level, density and temperature data of these tanks are recorded by the SMMS. Authentication of the SMMS, confirmed by the IAEA at the acceptance test, is kept by failure detection and recording functions of the system. (author)

  14. Dynamic thermal analysis of a concentrated photovoltaic system

    Science.gov (United States)

    Avrett, John T., II; Cain, Stephen C.; Pochet, Michael

    2012-02-01

    Concentrated photovoltaic (PV) technology represents a growing market in the field of terrestrial solar energy production. As the demand for renewable energy technologies increases, further importance is placed upon the modeling, design, and simulation of these systems. Given the U.S. Air Force cultural shift towards energy awareness and conservation, several concentrated PV systems have been installed on Air Force installations across the country. However, there has been a dearth of research within the Air Force devoted to understanding these systems in order to possibly improve the existing technologies. This research presents a new model for a simple concentrated PV system. This model accurately determines the steady state operating temperature as a function of the concentration factor for the optical part of the concentrated PV system, in order to calculate the optimum concentration that maximizes power output and efficiency. The dynamic thermal model derived is validated experimentally using a commercial polysilicon solar cell, and is shown to accurately predict the steady state temperature and ideal concentration factor.

  15. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  16. Environmental settings for selected U.S. Department of Energy installations - support information for the Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1994-12-01

    This report contains the environmental setting information developed for 20 U.S. Department of Energy (DOE) installations in support of the DOE's Programmatic Environmental Impact Study (PEIS). The objective of the PEIS is to provide the public with information about the types of radiological and hazardous wastes and environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that these wastes pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry. When possible, local experts participated in the initial development, fine tuning, and final review of the PEIS environmental settings

  17. Safeguards Strategy in Physical Protection System for Nuclear Installation

    International Nuclear Information System (INIS)

    Ade lndra B; Kasturi; Tatang Eryadi

    2004-01-01

    Safeguards strategy is directed at efforts of eliminating theft of nuclear materials and sabotage of nuclear installation. For achieving the above objective, it is necessary to set up safeguards strategy in physical protection of nuclear materials and installation. The safeguards strategy starts from anticipated security condition, list of thefts, planning referred to as safeguards planning. Safeguards planning are implemented in safeguards implementation, followed up then by evaluation. Results of evaluation are equipped with results of safeguards survey already developed. Safeguards' planning is made from these results and serve as guidelines for next safeguards implementation and is repeated to form a safeguard cycle. One safeguard cycle is made on a periodical basis, at least annually. (author)

  18. SU-E-J-134: An Augmented-Reality Optical Imaging System for Accurate Breast Positioning During Radiotherapy

    International Nuclear Information System (INIS)

    Nazareth, D; Malhotra, H; French, S; Hoffmann, K; Merrow, C

    2014-01-01

    Purpose: Breast radiotherapy, particularly electronic compensation, may involve large dose gradients and difficult patient positioning problems. We have developed a simple self-calibrating augmented-reality system, which assists in accurately and reproducibly positioning the patient, by displaying her live image from a single camera superimposed on the correct perspective projection of her 3D CT data. Our method requires only a standard digital camera capable of live-view mode, installed in the treatment suite at an approximately-known orientation and position (rotation R; translation T). Methods: A 10-sphere calibration jig was constructed and CT imaged to provide a 3D model. The (R,T) relating the camera to the CT coordinate system were determined by acquiring a photograph of the jig and optimizing an objective function, which compares the true image points to points calculated with a given candidate R and T geometry. Using this geometric information, 3D CT patient data, viewed from the camera's perspective, is plotted using a Matlab routine. This image data is superimposed onto the real-time patient image, acquired by the camera, and displayed using standard live-view software. This enables the therapists to view both the patient's current and desired positions, and guide the patient into assuming the correct position. The method was evaluated using an in-house developed bolus-like breast phantom, mounted on a supporting platform, which could be tilted at various angles to simulate treatment-like geometries. Results: Our system allowed breast phantom alignment, with an accuracy of about 0.5 cm and 1 ± 0.5 degree. Better resolution could be possible using a camera with higher-zoom capabilities. Conclusion: We have developed an augmented-reality system, which combines a perspective projection of a CT image with a patient's real-time optical image. This system has the potential to improve patient setup accuracy during breast radiotherapy, and could possibly be

  19. SU-E-J-134: An Augmented-Reality Optical Imaging System for Accurate Breast Positioning During Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Nazareth, D; Malhotra, H; French, S [Roswell Park Cancer Institute, Buffalo, NY (United States); Hoffmann, K [Neurosurgery at SUNY at Buffalo, Buffalo, NY (United States); Merrow, C [Bassett Healthcare, Oneonta, NY (United States)

    2014-06-01

    Purpose: Breast radiotherapy, particularly electronic compensation, may involve large dose gradients and difficult patient positioning problems. We have developed a simple self-calibrating augmented-reality system, which assists in accurately and reproducibly positioning the patient, by displaying her live image from a single camera superimposed on the correct perspective projection of her 3D CT data. Our method requires only a standard digital camera capable of live-view mode, installed in the treatment suite at an approximately-known orientation and position (rotation R; translation T). Methods: A 10-sphere calibration jig was constructed and CT imaged to provide a 3D model. The (R,T) relating the camera to the CT coordinate system were determined by acquiring a photograph of the jig and optimizing an objective function, which compares the true image points to points calculated with a given candidate R and T geometry. Using this geometric information, 3D CT patient data, viewed from the camera's perspective, is plotted using a Matlab routine. This image data is superimposed onto the real-time patient image, acquired by the camera, and displayed using standard live-view software. This enables the therapists to view both the patient's current and desired positions, and guide the patient into assuming the correct position. The method was evaluated using an in-house developed bolus-like breast phantom, mounted on a supporting platform, which could be tilted at various angles to simulate treatment-like geometries. Results: Our system allowed breast phantom alignment, with an accuracy of about 0.5 cm and 1 ± 0.5 degree. Better resolution could be possible using a camera with higher-zoom capabilities. Conclusion: We have developed an augmented-reality system, which combines a perspective projection of a CT image with a patient's real-time optical image. This system has the potential to improve patient setup accuracy during breast radiotherapy, and could

  20. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  1. Installation guidelines for Solar Heating System, single-family residence at New Castle, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Solar Heating System installer guidelines are provided for each subsystem and includes testing and filling the system. This single-family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Information is also provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance. Information consists of written procedures, schematics, detail drawings, pictures and manufacturer's component data.

  2. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  3. Highly accurate and fast optical penetration-based silkworm gender separation system

    Science.gov (United States)

    Kamtongdee, Chakkrit; Sumriddetchkajorn, Sarun; Chanhorm, Sataporn

    2015-07-01

    Based on our research work in the last five years, this paper highlights our innovative optical sensing system that can identify and separate silkworm gender highly suitable for sericulture industry. The key idea relies on our proposed optical penetration concepts and once combined with simple image processing operations leads to high accuracy in identifying of silkworm gender. Inside the system, there are electronic and mechanical parts that assist in controlling the overall system operation, processing the optical signal, and separating the female from male silkworm pupae. With current system performance, we achieve a very highly accurate more than 95% in identifying gender of silkworm pupae with an average system operational speed of 30 silkworm pupae/minute. Three of our systems are already in operation at Thailand's Queen Sirikit Sericulture Centers.

  4. Design, Construction, Installation and First Commissioning Results of the LHC Cryogenic System

    CERN Document Server

    Claudet, S

    2006-01-01

    The cryogenic system of the Large Hadron Collider (LHC) will be, upon its completion in 2006, the largest in the world in terms of refrigeration capacity with an equivalent to 144 kW at 4.5 K, about 400'000 litres of superfluid helium with 25 km of superconducting magnets below 2 K leading to a cryogen inventory of 100 tons of helium. The challenges involved in the design, construction and installation, as well as the first commissioning results will be addressed in this talk. Particular mention will be made of the problems encountered and how they were or are being solved. Perspectives for LHC will be presented. General considerations for future large cryogenic systems will be briefly proposed.

  5. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  6. Design and installation manual for thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M [eds.

    1979-02-01

    The purpose for this manual is to provide information on the design and installation of thermal energy storage in solar heating systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating system, and stand-alone domestic hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  7. Solar heating and cooling system installed at Leavenworth, Kansas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Perkins, R. M.

    1980-06-01

    The solar heating and cooling system installed at the headquarters of Citizens Mutual Savings Association in Leavenworth, Kansas, is described in detail. The project is part of the U.S. Department of Energy's solar demonstration program and became operational in March, 1979. The designer was TEC, Inc. Consulting Engineers, Kansas City, Missouri and contractor was Norris Brothers, Inc., Lawrence, Kansas. The solar system is expected to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2200 square feet. Five, 3-ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3000 gallon chilled water storage tank. Two, 3000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

  8. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  9. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  10. The air quality in ventilation installations. Practical guidelines; Qualite de l'air dans les installations aerauliques. Guide pratique

    Energy Technology Data Exchange (ETDEWEB)

    Angeli, L. [France Air, 91 - Chilly Mazarin (France); Bianchina, M. [Unelvent, 93 - Le Bourget (France); Blazy, M. [Anjos, 01 - Torcieu (France); Boulanger, X. [Aldes, 21 - Chenove (France); Chiesa, M. [Atlantic (France); Duclos, M. [Groupe Titanair, 69 - Lyon (France); Hubert, D.; Kridorian, O. [Groupe Astato, Blanc Mesnil (France); Josserand, O. [Carrier (Belgium); Lancieux, C. [Camfil, 60 - Saint Martin Longueau (France); Lemaire, J.C. [Agence de l' Environnement et de la Maitrise de l' Energie, ADEME, 75 - Paris (France); Petit, Ph. [Compagnie Industrielle d' Applications Thermiques ( CIAT ), 75 - Paris (France); Ribot, B. [Electricite de France (EDF), 75 - Paris (France); Tokarek, S. [Gaz de France (GDF), 75 - Paris (France); Bernard, A.M.; Tissot, A. [Centre Technique des Industries Aerauliques et Thermiques (CETIAT), 69 - Villeurbanne (France)

    2004-07-01

    The present guide aims to provide design departments, maintenance companies and builders with practical guidelines and recommendations for the installation of ventilation and air-conditioning systems. The objective is to ensure good Indoor Air Quality (IAQ) and to safeguard the health and well-being of the occupants. The guide deals with aspects of design, dimensioning, installation and servicing, all of which play a major role in guaranteeing IAQ and duct-work hygiene. These steps are reviewed for the principal ventilation systems met in both residential and commercial premises. The first part presents the system and draws the attention of the user to specific points which require particular care in term of IAQ. The second part details recommended practice component by component, in respect of design, installation and servicing. Application of these simple guidelines during the various project stages is essential, in order to ensure a good IAQ in ventilation systems. Content: introduction; good ventilation; systems: exhaust ventilation, balanced ventilation, air handling unit, terminal ventilation units, impact of systems on indoor air quality, components: air inlet, air filter, heat recovery unit, heating or cooling coil, humidifier, mechanical fan unit, cowl and hybrid ventilation fan, mixing box, ventilation duct-work, air outlet and air terminal device; references.

  11. 41 CFR 101-39.304 - Modification or installation of accessory equipment.

    Science.gov (United States)

    2010-07-01

    ..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.3-Use and Care of GSA Interagency Fleet Management System Vehicles § 101-39.304 Modification or installation of accessory equipment. The modification of a GSA Interagency Fleet Management System (IFMS) vehicle or the permanent installation of...

  12. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  13. Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors

    Science.gov (United States)

    Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.

    2015-01-01

    This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.

  14. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  15. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  16. Assembly, installation and commissioning of the JET-EP Halo Current Sensors system

    International Nuclear Information System (INIS)

    Peruzzo, S.; Grando, L.; Pomaro, N.; Sonato, P.; Fullard, K.; Huntley, S.; Lam, N.; Riccardo, V.

    2006-01-01

    The Halo Current Sensors (HCS) system has been developed under the JET-EP enhancement programme, to allow a more detailed study of the Halo Currents flowing in the upper part of the JET vessel. A better understanding of the origin, distribution and scaling of Halo Currents in tokamaks is one of the critical issues for any next step device, like the ITER project, in particular for the design of the plasma facing components and for a reliable plasma operation at high performances. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, each containing up to eight Rogowski coils and two toroidal field pick-up coils. The Rogowski coils are designed to directly measure the current flowing through the tiles of the upper dump plate, whereas the toroidal field pick-up coils are conceived to give an estimate the total poloidal Halo Current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/05 Shutdown and started the acquisition of signals during the restart phase of the machine in autumn 2005. This paper will highlight and discuss the critical aspects and the lessons learned during the final phase of the procurement of the system; the in-vessel installation, accomplished by means of remote handling system, and the pre-commissioning tests executed on the system will be described in detail. The paper will then focus on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns. Since the beginning of operation the HCS signals showed the effects of several noise sources, increased by the low sensitivity of the probes, due to design geometrical constraints. The expected pick-up of stray magnetic fields was quite easily compensated through a correlation with other existing magnetic diagnostics. Moreover the

  17. Installation of spectrally selective imaging system in RF negative ion source

    International Nuclear Information System (INIS)

    Ikeda, K.; Kisaki, M.; Nagaoka, K.; Nakano, H.; Osakabe, M.; Tsumori, K.; Kaneko, O.; Takeiri, Y.; Wünderlich, D.; Fantz, U.; Heinemann, B.; Geng, S.

    2016-01-01

    A spectrally selective imaging system has been installed in the RF negative ion source in the International Thermonuclear Experimental Reactor-relevant negative ion beam test facility ELISE (Extraction from a Large Ion Source Experiment) to investigate distribution of hydrogen Balmer-α emission (H α ) close to the production surface of hydrogen negative ion. We selected a GigE vision camera coupled with an optical band-path filter, which can be controlled remotely using high speed network connection. A distribution of H α emission near the bias plate has been clearly observed. The same time trend on H α intensities measured by the imaging diagnostic and the optical emission spectroscopy is confirmed

  18. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  19. Characterization of 3-Dimensional PET Systems for Accurate Quantification of Myocardial Blood Flow.

    Science.gov (United States)

    Renaud, Jennifer M; Yip, Kathy; Guimond, Jean; Trottier, Mikaël; Pibarot, Philippe; Turcotte, Eric; Maguire, Conor; Lalonde, Lucille; Gulenchyn, Karen; Farncombe, Troy; Wisenberg, Gerald; Moody, Jonathan; Lee, Benjamin; Port, Steven C; Turkington, Timothy G; Beanlands, Rob S; deKemp, Robert A

    2017-01-01

    Three-dimensional (3D) mode imaging is the current standard for PET/CT systems. Dynamic imaging for quantification of myocardial blood flow with short-lived tracers, such as 82 Rb-chloride, requires accuracy to be maintained over a wide range of isotope activities and scanner counting rates. We proposed new performance standard measurements to characterize the dynamic range of PET systems for accurate quantitative imaging. 82 Rb or 13 N-ammonia (1,100-3,000 MBq) was injected into the heart wall insert of an anthropomorphic torso phantom. A decaying isotope scan was obtained over 5 half-lives on 9 different 3D PET/CT systems and 1 3D/2-dimensional PET-only system. Dynamic images (28 × 15 s) were reconstructed using iterative algorithms with all corrections enabled. Dynamic range was defined as the maximum activity in the myocardial wall with less than 10% bias, from which corresponding dead-time, counting rates, and/or injected activity limits were established for each scanner. Scatter correction residual bias was estimated as the maximum cavity blood-to-myocardium activity ratio. Image quality was assessed via the coefficient of variation measuring nonuniformity of the left ventricular myocardium activity distribution. Maximum recommended injected activity/body weight, peak dead-time correction factor, counting rates, and residual scatter bias for accurate cardiac myocardial blood flow imaging were 3-14 MBq/kg, 1.5-4.0, 22-64 Mcps singles and 4-14 Mcps prompt coincidence counting rates, and 2%-10% on the investigated scanners. Nonuniformity of the myocardial activity distribution varied from 3% to 16%. Accurate dynamic imaging is possible on the 10 3D PET systems if the maximum injected MBq/kg values are respected to limit peak dead-time losses during the bolus first-pass transit. © 2017 by the Society of Nuclear Medicine and Molecular Imaging.

  20. Installation and commissioning of Scandiflash-450 flash X-ray generator at BARC, Visakhapatnam

    International Nuclear Information System (INIS)

    Banerjee, P.; Verma, R.; Shukla, R.; Sharma, S.K.; Das, B.; Prabaharan, T.; Deb, P.; Das, R.; Adhikary, B.; Meena, M.; Sagar, K.; Shyam, A.

    2014-08-01

    Energetics and Electromagnetics Division, BARC, Visakhapatnam has possessed a Flash X-ray radiography (FXR) system, make: Scandiflash, Sweden. This installation and commissioning of the system has been done by ourselves. Few problems have been detected during installation and commissioning. The troubleshooting of the system has been done. Somewhere we needed to replace the original components by indigenously made one. The complete installation and commissioning has been reportedly as far as detailed possible. Presently the system is working with satisfaction. The installed facility is being used as one of the primary means of diagnostics in many of the ongoing experiments. (author)

  1. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Barbose, Galen; Peterman, Carla

    2009-02-11

    As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

  2. NOS module - reducing the nitrogen oxides and dust emissions of wood-fired systems; NOS-Modul. Installation und Test - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Salerno, B.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a project that examined the potential of reducing dust and nitrogen oxides emissions of biomass-fired systems. Two prototype installations are described with capacities of 70 - 300 kW and 150 - 500 kW, the latter being a mobile installation installed together with a silo in a container. The prototypes can burn problematical biomass such as cereals, chicken droppings, damp wood-chippings and straw. Various factors and configurations influencing the formation of emissions are examined. Cyclone technology, a catalyst using chrome-nickel shavings and a ceramic heat-exchanger are discussed. Measurements made are presented in tabular and graphical form and discussed.

  3. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  4. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  5. 30 CFR 75.1103-4 - Automatic fire sensor and warning device systems; installation; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... systems that use carbon monoxide sensors shall provide identification of fire along all belt conveyors. (1... downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the...

  6. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  7. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  8. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  9. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  10. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  11. Extension of the Accurate Voltage-Sag Fault Location Method in Electrical Power Distribution Systems

    Directory of Open Access Journals (Sweden)

    Youssef Menchafou

    2016-03-01

    Full Text Available Accurate Fault location in an Electric Power Distribution System (EPDS is important in maintaining system reliability. Several methods have been proposed in the past. However, the performances of these methods either show to be inefficient or are a function of the fault type (Fault Classification, because they require the use of an appropriate algorithm for each fault type. In contrast to traditional approaches, an accurate impedance-based Fault Location (FL method is presented in this paper. It is based on the voltage-sag calculation between two measurement points chosen carefully from the available strategic measurement points of the line, network topology and current measurements at substation. The effectiveness and the accuracy of the proposed technique are demonstrated for different fault types using a radial power flow system. The test results are achieved from the numerical simulation using the data of a distribution line recognized in the literature.

  12. Statistical analysis of installed wind capacity in the United States

    International Nuclear Information System (INIS)

    Staid, Andrea; Guikema, Seth D.

    2013-01-01

    There is a large disparity in the amount of wind power capacity installed in each of the states in the U.S. It is often thought that the different policies of individual state governments are the main reason for these differences, but this may not necessarily be the case. The aim of this paper is to use statistical methods to study the factors that have the most influence on the amount of installed wind capacity in each state. From this analysis, we were able to use these variables to accurately predict the installed wind capacity and to gain insight into the driving factors for wind power development and the reasons behind the differences among states. Using our best model, we find that the most important variables for explaining the amount of wind capacity have to do with the physical and geographic characteristics of the state as opposed to policies in place that favor renewable energy. - Highlights: • We conduct a statistical analysis of factors influencing wind capacity in the U.S. • We find that state policies do not strongly influence the differences among states. • Driving factors are wind resources, cropland area, and available percentage of land

  13. Lessons learned from a whole hospital PACS installation. Picture Archiving and Communication System.

    Science.gov (United States)

    Pilling, J R

    2002-09-01

    The Norfolk and Norwich University Hospital has incorporated a fully filmless Picture Archiving and Communication System (PACS) as part of a new hospital provision using PFI funding. The PACS project has been very successful and has met with unanimous acclaim from radiologists and clinicians. A project of this size cannot be achieved without learning some lessons from mistakes and recognising areas where attention to detail resulted in a successful implementation. This paper considers the successes and problems encountered in a large PACS installation.

  14. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  15. Practices for improving the serviceability of linings installations in open systems

    International Nuclear Information System (INIS)

    Spieres, G.V.; Tombaugh, R.S.

    2001-01-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  16. Total cost of ownership of CHP SOFC systems: Effect of installation context

    International Nuclear Information System (INIS)

    Arduino, Francesco; Santarelli, Massimo

    2016-01-01

    Solid oxide fuel cells (SOFC) are one of the most interesting between the emerging technologies for energy production. Although some information about the production cost of these devices are already known, their operational cost has not been studied yet with sufficient accuracy. This paper presents a life cycle cost (LCC) analysis of CHP (combined heat and power) SOFC systems performed in hospitals located in various cities of the US and one in Italy. In this study the strong effects of the installation context will be analyzed using a customized use phase model for each location. The cost effectiveness of these devices has been proved without credits in Mondovi (IT), New York (NY) and Minneapolis (MN) where the payback time goes from 10 to 7 years. Considering the credits, it is possible to obtain economic feasibility also in Chicago (IL) and reduce the payback for other cities to values from 4 to 6 years. In other cities like Phoenix (AZ) and Houston (TX) the payback can’t be reached in any case. The life cycle impact assessment analysis has shown how, even in the cities with cleaner electricity grid, there is a reduction in the emissions of both greenhouse gases and pollutants. - Highlights: •Life cycle cost analysis has been performed for CHP SOFC systems. •The strong effects of the installation context have been analyzed. •Economic feasibility has been proven in new york, Minneapolis and Mondovi. •Economic feasibility can’t be reached in phoenix and Houston. •SOFC always provide a reduction in the emissions of greenhouse gases and pollutant.

  17. Solar heating and hot water system installed at Arlington Raquetball Club, Arlington, Virginia

    Science.gov (United States)

    1981-01-01

    A solar space and water heating system is described. The solar energy system consists of 2,520 sq. ft. of flat plate solar collectors and a 4,000 gallon solar storage tank. The transfer medium in the forced closed loop is a nontoxic antifreeze solution (50 percent water, 50 percent propylene glycol). The service hot water system consists of a preheat coil (60 ft. of 1 1/4 in copper tubing) located in the upper third of the solar storage tank and a recirculation loop between the preheat coil and the existing electric water heaters. The space heating system consists of two separate water to air heat exchangers located in the ducts of the existing space heating/cooling systems. The heating water is supplied from the solar storage tank. Extracts from site files, specification references for solar modifications to existing building heating and hot water systems, and installation, operation and maintenance instructions are included.

  18. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  19. Development of cryogenic installations for large liquid argon neutrino detectors

    CERN Document Server

    Adamowski, M; Geynisman, M; Hentschel, S; Montanari, D; Nessi, M; Norris, B

    2015-01-01

    A proposal for a very large liquid argon (68,000 kg) based neutrino detector is being studied. To validate the design principles and the detector technology, and to gain experience in the development of the cryostats and the cryogenic systems needed for such large experiments, several smaller scale installations will be developed and implemented, at Fermilab and CERN. The cryogenic systems for these installations will be developed, constructed, installed and commissioned by an international engineering team. These installations shall bring the required cooling power under specific conditions to the experiments for the initial cool-down and the long term operation, and shall also guarantee the correct distribution of the cooling power within the cryostats to ensure a homogeneous temperature distribution within the cryostat itself. The cryogenic systems shall also include gaseous and liquid phase argon purification devices to be used to reach and maintain the very stringent purity requirements needed for these...

  20. Development and implementation of computerized operator support systems in nuclear installations

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to address the development and implementation of computerized operator support systems (COSS) in nuclear installations. The requirements of operators in information management and job performance in a control room environment are discussed. These requirements, which must be agreed to by the operators, provide a focus for the developers of COSS for implementation in an operational environment. The design methodology presents good practice approaches derived from the experience gained and the lessons learned during actual development of the COSS. The team concept, pilot study and structured step by step phases of software development and implementation should help COSS developers to achieve the level of quality and reliability required. 8 figs, 1 tab

  1. Design and installation manual for thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  2. Guidelines for safety related telecommunications systems on normally attended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally attended offshore installations associated with oil and gas production on the United Kingdom continental shelf. Basic requirements for such equipment are presented as a series of objectives which should be capable of being met in the event of any emergency situation arising. The telecommunications facilities necessary to meet these objectives are identified, together with the role of each facility in controlling the emergency, how each would be used and the design considerations to ensure the facilities will remain operational throughout the emergency. (UK)

  3. Irradiation process validation in the new conveyor system installed at PISI: special dosimetry

    International Nuclear Information System (INIS)

    Pantano, Barbara P.; Docters, Andrea S.

    2009-01-01

    Semi Industrial Irradiation Plant (PISI) is a multipurpose facility which uses 60 Co sources to treat different products with numerous purposes, such as sterilization of medical devices, pharmaceutical and veterinarian products; control of pathogenic microorganisms, shelf-life extension and insect disinfestation of food, among others. In order to achieve the desired effect, the product is carried inside the irradiation chamber by means of a conveyor system, and it is exposed to radiation following a pre-established path. The recent installation of a new conveyor system at PISI demands the execution of a thorough validation programme. The scope of this presentation is to describe the dose mapping tasks that will be performed in order to characterize the irradiator and its new conveyor system with respect to distribution and variability of dose, complying with international standards on good irradiation practices. Information about the distribution and variability of dose in a product irradiated under defined conditions will allow the obtaining of process parameters which will conform the process specifications in future routine irradiations. The initial stages of the Validation Programme are the Installation Qualification, the Operational Qualification (OQ) and the Performance Qualification (PQ). To accomplish the IQ diverse tests are being carried out at PISI in order to verify that the system has been installed and is operating according to its technical specifications. Both OQ and PQ require dose mapping on simulated and real product, respectively. Dose mapping consists on placing dosimeters on a process load of homogeneous material -under certain irradiator and process parameters- according to a three-dimensional pre-established placement pattern. Since the replacement of the conveyor system introduces a significant modification in the source-to-product geometry, therefore in dose distribution, there is no reference dosimetry data available, so a more exhaustive

  4. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  5. Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations

    Science.gov (United States)

    2016-04-04

    still slightly more expensive to install than utility-scale PV, distributed solar installation costs decreased in half since 2008, and this power source...has been privately purchased and installed . However, utility companies are beginning to purchase and install solar panel systems on homes and...front installation and hardware costs. This new initiative accounted for more than 72 % of U.S. residential solar installations in 2Ol4. Over the past

  6. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  7. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  8. Installation and evaluation of a nitrogen-16 detector in the Ford nuclear reactor

    International Nuclear Information System (INIS)

    Burn, R.R.

    1995-01-01

    Core differential temperature is the final measure of steady-state power at the Ford nuclear reactor. During some evolutions, such as changing the number of cooling-tower fans in operation, differential temperature undergoes a transient and does not provide an accurate measure of true power. A 16 N detector was installed to provide a more stable measure of power, even under transient conditions

  9. Compact activation detectors for measuring of neutron emission on plasma focus installations

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Peregudova, E.V.; Volobuev, I.V.

    2005-01-01

    The paper presents the two compact simple systems for the measurement of the absolute neutron yield in the range 10 6 - 10 12 neutrons/pulse and higher and spatial anisotropy of neutron radiation. The systems are destined for the registration of the short duration neutron radiation of the pulsed plasma installations, such as Plasma Focus (PF), z-pinches and others plasma installations. This paper also includes the results of the neutron emission measurements on different PF installations: 'Tulip' (P.N. Lebedev Physical Institute, Moscow Russia), the PF-1000 and PF-150 installations (Institute of Plasma Physics and Laser Microfusion, Warsaw, Poland)

  10. Characterization of 3D PET systems for accurate quantification of myocardial blood flow

    OpenAIRE

    Renaud, Jennifer M.; Yip, Kathy; Guimond, Jean; Trottier, Mikaël; Pibarot, Philippe; Turcotte, Éric; Maguire, Conor; Lalonde, Lucille; Gulenchyn, Karen; Farncombe, Troy; Wisenberg, Gerald; Moody, Jonathan; Lee, Benjamin; Port, Steven C.; Turkington, Timothy G

    2016-01-01

    Three-dimensional (3D) mode imaging is the current standard for positron emission tomography-computed tomography (PET-CT) systems. Dynamic imaging for quantification of myocardial blood flow (MBF) with short-lived tracers, such as Rb-82- chloride (Rb-82), requires accuracy to be maintained over a wide range of isotope activities and scanner count-rates. We propose new performance standard measurements to characterize the dynamic range of PET systems for accurate quantitative...

  11. Annual report 1 January - 31 December 1978 computer installation

    International Nuclear Information System (INIS)

    1979-05-01

    The computer installation of Risoe National Laboratory functions as an internal service bureau. The staff is concentrated around operating the computer and providing expertise in the fields of numerical mathematics, statistics, operation research, systems software, and software engineering. Selected parts of the activities at the Computer Installation are described. (B.P.)

  12. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  13. Performance of cooling installation for cyclotron Decy-13

    International Nuclear Information System (INIS)

    Edi Trijono Budisantoso; Suprapto; Sutadi

    2015-01-01

    Has been calculated the cooling installation performance of Decy-13 cyclotron. The cooling installation is analysed based on the technical specifications of each cooling component to proof the results of the design and implementation of installations meet the cooling requirement. Analysis of loss of pressure and flow rate in the piping installation is done empirically using Hazen-Williams equation while the analysis of heat transfer processes in the cooling tower is done using the help of psychometric charts that available. Cooling component consists of a condenser and associated piping systems with cooling towers and equipped with a pump to push the circulation of cooling. The calculations show that the installation of the condenser cooler uses the cooling tower LiangChi LBC-30 with a booster pump Grundfos 4 kW NF30-36T powered 47kW able to transfer heat with the coolant flow rate 136 lpm, input to output coolant pressure difference 2.1atm and the cooling temperature difference 5 °C. Conclusion of the calculation is the technical specifications of cooling components and installation already meets the needs of the cooling expected. (author)

  14. A Sensitivity Study of the Impact of Installation Parameters and System Configuration on the Performance of Bifacial PV Arrays

    Energy Technology Data Exchange (ETDEWEB)

    Marion, William F [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Deline, Christopher A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Asgharzadeh, Amir [University of Iowa; Hansen, Clifford [Sandia National Laboratories; Stein, Joshua S. [Sandia National Laboratories; Toor, Fatima [University of Iowa

    2018-04-19

    In this paper, we present the effect of installation parameters (tilt angle, height above ground, and albedo) on the bifacial gain and energy yield of three south-facing photovoltaic (PV) system configurations: a single module, a row of five modules, and five rows of five modules utilizing RADIANCE-based ray tracing model. We show that height and albedo have a direct impact on the performance of bifacial systems. However, the impact of the tilt angle is more complicated. Seasonal optimum tilt angles are dependent on parameters such as height, albedo, size of the system, weather conditions, and time of the year. For a single bifacial module installed in Albuquerque, NM, USA (35 degrees N) with a reasonable clearance (~1 m) from the ground, the seasonal optimum tilt angle is lowest (~5 degrees) for the summer solstice and highest (~65 degrees) for the winter solstice. For larger systems, seasonal optimum tilt angles are usually higher and can be up to 20 degrees greater than that for a single module system. Annual simulations also indicate that for larger fixed-tilt systems installed on a highly reflective ground (such as snow or a white roofing material with an albedo of ~81%), the optimum tilt angle is higher than the optimum angle of the smaller size systems. We also show that modules in larger scale systems generate lower energy due to horizon blocking and large shadowing area cast by the modules on the ground. For albedo of 21%, the center module in a large array generates up to 7% less energy than a single bifacial module. To validate our model, we utilize measured data from Sandia National Laboratories' fixed-tilt bifacial PV testbed and compare it with our simulations.

  15. Awareness of the Installation the Lightning Protection System (LPS by Using Structural Bonding Method in Malaysia

    Directory of Open Access Journals (Sweden)

    Abdul Rahim Mustaqqim

    2017-01-01

    Full Text Available Structural Bonding Method (SBM is one type of Lightning Protection System (LPS, design to protect human, structures, contents inside structures, electrical equipment, transmission lines and other from the lightning flash. Besides, SBM is a standard LPS that comply with technical standards or codes of practice or called as conventional Lightning Protection System. In order to know the level of the Awareness of the Installation LPS by using SBM in the building among Civil Engineering Consultants, conducting survey need to be done. This paper presents the Research Design and Research Strategy in conducting the survey. It is explaining about the way before conducting the survey which are determine the population of sample (Consultant Company at Northern Region Area, samples of respondents (Civil Engineer at Consultant Office with the number of sample is 40, data collecting process, structure of the questionnaire form and the way in analysis the data. After the analysis the data, the result of the level of awareness in the Installation of LPS by using SBM are consider as moderate level.

  16. Outline of a future security system to provide physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Rossnagel, A.

    1984-01-01

    Nuclear energy, within three or four decades, may become a main pillar of the world's energy supply. The author discusses the problems entailed by the necessity to protect nuclear facilities against assaults, and whether this can be ensured without interference with civic rights. The method applied by the author to show the significance of the problems is to explain the current situation, and to compare it with a plausible outline of the developments to be expected over the next 50 years. He shows the hazards to be taken into account due to criminal actions by persons from outside, or by persons working in nuclear facilities. A main problem is the fact that the security system to be set up has to encompass not only the nuclear installation itself, but also the surrounding area, and the measures to be taken will have an impact on the society, which necessarily will curtail personal freedom. The author presumes that the necessity to guarantee physical protection of nuclear facilities will lead to a modification of the meaning of basic rights, and states his anxiety that security for nuclear installations might affect our concept of freedom. (HSCH) [de

  17. Functioning strategy study on control systems of large physical installations used with a digital computer

    International Nuclear Information System (INIS)

    Bel'man, L.B.; Lavrikov, S.A.; Lenskij, O.D.

    1975-01-01

    A criterion to evaluate the efficiency of a control system functioning of large physical installations by means of a control computer. The criteria are the object utilization factor and computer load factor. Different strategies of control system functioning are described, and their comparative analysis is made. A choice of such important parameters as sampling time and parameter correction time is made. A single factor to evaluate the system functioning efficiency is introduced and its dependence on the sampling interval value is given. Using diagrams attached, it is easy to find the optimum value of the sampling interval and the corresponding maximum value of the single efficiency factor proposed

  18. Impact of organic Rankine cycle system installation on light duty vehicle considering both positive and negative aspects

    International Nuclear Information System (INIS)

    Usman, Muhammad; Imran, Muhammad; Yang, Youngmin; Park, Byung-Sik

    2016-01-01

    Highlights: • Positive and negative effects of waste heat recovery unit on vehicle were studied. • Organic Rankine cycle based power system for waste heat recovery. • Relationship of ORC unit weight and power was developed. • Impact of added weight, Part load operation and back pressure are presented. • Power enhancement of 5.82% of engine when positive & negative effects considered. - Abstract: This paper presents the analysis of organic Rankine cycle (ORC) based waste heat recovery system. Both the positive and negative effects of ORC system installation on a light duty vehicle were evaluated. Engine exhaust data for a light duty vehicle was used to design an ORC based system. Optimum cycle design suggests that ORC system installation is feasible. Results presented that for the vehicle operation at 100 km/h, engine power can be enhanced by 10.88% which is 5.92 kW of additional power and at the lower speed of 23.5 km/h, the engine power enhancement was 2.34%. ORC component weight data from manufacturers were used to estimate the weight of the designed system. The performance decline due to added weight is calculated. Effects of added back pressure and performance decline due to the part-load operation of ORC unit were also calculated and an overall effect of waste heat recovery system was evaluated. The results then suggested that maximum power enhancement is 5.82% at the vehicle speed of 100 km/h instead of previously mentioned 10.88% can be achieved if negative effects are also considered. Furthermore, it was concluded that at speeds lower than 48 km/h the waste heat recovery system was not beneficial at all and low-speed operation was in fact not preferable as it results in additional power demand from the engine by 6.39% at 23.5 km/h. The vehicles for city driving cycles are not recommended for ORC installation. Another finding revealed that if exhaust heat recovery heat exchanger is designed for maximum heat recovery, at part load operation, the

  19. Qualitative analysis of the man-organization system in accident conditions for nuclear installations

    International Nuclear Information System (INIS)

    Farcasiu, Mita; Prisecaru, Ilie

    2010-01-01

    In this paper a model of the human performance investigation of accident conditions in the operation of the nuclear installation is developed. A framework for analyses of the human action in the man-organization system context is achieved. The goal of this model is to identify the possible roots causing human errors which could occur during the evolution of the accident by the qualitative analysis of the interfaces in man-organization system. These interfaces represent the main elements which characterize the implication of the organization in human performance. The results of this paper are the interfaces of the man-organization and their circumstances in which human performance could fail. Also, another result is a pre-designed framework which could help in the investigation of an accident. (authors)

  20. Cabin fuselage structural design with engine installation and control system

    Science.gov (United States)

    Balakrishnan, Tanapaal; Bishop, Mike; Gumus, Ilker; Gussy, Joel; Triggs, Mike

    1994-01-01

    Design requirements for the cabin, cabin system, flight controls, engine installation, and wing-fuselage interface that provide adequate interior volume for occupant seating, cabin ingress and egress, and safety are presented. The fuselage structure must be sufficient to meet the loadings specified in the appropriate sections of Federal Aviation Regulation Part 23. The critical structure must provide a safe life of 10(exp 6) load cycles and 10,000 operational mission cycles. The cabin seating and controls must provide adjustment to account for various pilot physiques and to aid in maintenance and operation of the aircraft. Seats and doors shall not bind or lockup under normal operation. Cabin systems such as heating and ventilation, electrical, lighting, intercom, and avionics must be included in the design. The control system will consist of ailerons, elevator, and rudders. The system must provide required deflections with a combination of push rods, bell cranks, pulleys, and linkages. The system will be free from slack and provide smooth operation without binding. Environmental considerations include variations in temperature and atmospheric pressure, protection against sand, dust, rain, humidity, ice, snow, salt/fog atmosphere, wind and gusts, and shock and vibration. The following design goals were set to meet the requirements of the statement of work: safety, performance, manufacturing and cost. To prevent the engine from penetrating the passenger area in the event of a crash was the primary safety concern. Weight and the fuselage aerodynamics were the primary performance concerns. Commonality and ease of manufacturing were major considerations to reduce cost.

  1. Field installation versus local integration of photovoltaic systems and their effect on energy evaluation metrics

    International Nuclear Information System (INIS)

    Halasah, Suleiman A.; Pearlmutter, David; Feuermann, Daniel

    2013-01-01

    In this study we employ Life-Cycle Assessment to evaluate the energy-related impacts of photovoltaic systems at different scales of integration, in an arid region with especially high solar irradiation. Based on the electrical output and embodied energy of a selection of fixed and tracking systems and including concentrator photovoltaic (CPV) and varying cell technology, we calculate a number of energy evaluation metrics, including the energy payback time (EPBT), energy return factor (ERF), and life-cycle CO 2 emissions offset per unit aperture and land area. Studying these metrics in the context of a regionally limited setting, it was found that utilizing existing infrastructure such as existing building roofs and shade structures does significantly reduce the embodied energy requirements (by 20–40%) and in turn the EPBT of flat-plate PV systems due to the avoidance of energy-intensive balance of systems (BOS) components like foundations. Still, high-efficiency CPV field installations were found to yield the shortest EPBT, the highest ERF and the largest life-cycle CO 2 offsets—under the condition that land availability is not a limitation. A greater life-cycle energy return and carbon offset per unit land area is yielded by locally-integrated non-concentrating systems, despite their lower efficiency per unit module area. - Highlights: ► We evaluate life-cycle energy impacts of PV systems at different scales. ► We calculate the energy payback time, return factor and CO 2 emissions offset. ► Utilizing existing structures significantly improves metrics of flat-plate PV. ► High-efficiency CPV installations yield best return and offset per aperture area. ► Locally-integrated flat-plate systems yield best return and offset per land area.

  2. Methods of physical experiment and installation automation on the base of computers

    International Nuclear Information System (INIS)

    Stupin, Yu.V.

    1983-01-01

    Peculiarities of using computers for physical experiment and installation automation are considered. Systems for data acquisition and processing on the base of microprocessors, micro- and mini-computers, CAMAC equipment and real time operational systems as well as systems intended for automation of physical experiments on accelerators and installations of laser thermonuclear fusion and installations for plasma investigation are dpscribed. The problems of multimachine complex and multi-user system, arrangement, development of automated systems for collective use, arrangement of intermachine data exchange and control of experimental data base are discussed. Data on software systems used for complex experimental data processing are presented. It is concluded that application of new computers in combination with new possibilities provided for users by universal operational systems essentially exceeds efficiency of a scientist work

  3. Java/JNI/C/Fortran based HSVD/HLSVD custom plugins for the jMRUI software system : Development, installation and usage

    NARCIS (Netherlands)

    De Beer, R.; Van Ormondt, D.

    2015-01-01

    This work was done in the context of FP7 - PEOPLE Marie Curie Initial Training Network Project PITN-GA-2012-316679-TRANSACT. This report describes the development, installation and usage of the HSVD and HLSVD plugin for the jMRUI software system. The latter system is maintained by the TRANSACT EU

  4. Experience with HEPA filters at United States nuclear installations

    International Nuclear Information System (INIS)

    Bellamy, R.R.

    1977-01-01

    Part 50 of Title 10 of the United States Code of Federal Regulations requires that a number of atmosphere cleanup systems be included in the design of commercial nuclear power plants to be licensed in the United States. These filtering systems are to contain high efficiency particulate air (HEPA) filters for removal of radioactive particulate matter generated during normal and accident conditions. Recommendations for the design, testing and maintenance of the filtering systems and HEPA filter components are contained in a number of United States Nuclear Regulatory Commission documents and industry standards. This paper will discuss this published guidance available to designers of filtering systems and the plant operators of U.S. commercial nuclear power plants. The paper will also present a survey of published reports of experience with HEPA filters, failures and possible causes for the failures, and other abnormal occurrences pertaining to HEPA filters installed in U.S. nuclear power installations. A discussion will be included of U.S. practices for qualification of HEPA filters before installation, and verification of continued performance capability at scheduled intervals during operation

  5. Peak Load Regulation and Cost Optimization for Microgrids by Installing a Heat Storage Tank and a Portable Energy System

    Directory of Open Access Journals (Sweden)

    Hong Zhang

    2018-04-01

    Full Text Available With the rapid growth of electricity demands, many traditional distributed networks cannot cover their peak demands, especially in the evening. Additionally, with the interconnection of distributed electrical and thermal grids, system operational flexibility and energy efficiency can be affected as well. Therefore, by adding a portable energy system and a heat storage tank to the traditional distributed system, this paper proposes a newly defined distributed network to deal with the aforementioned problems. Simulation results show that by adding a portable energy system, fossil fuel energy consumption and daily operation cost can be reduced by 8% and 28.29%, respectively. Moreover, system peak load regulating capacity can be significantly improved. However, by introducing the portable energy system to the grid, system uncertainty can be increased to some extent. Therefore, chance constrained programming is proposed to control the system while considering system uncertainty. By applying Particle Swarm Optimization—Monte Carlo to solve the chance constrained programming, results show that power system economy and uncertainty can be compromised by selecting appropriate confidence levels α and β. It is also reported that by installing an extra heat storage tank, combined heat and power energy efficiency can be significantly improved and the installation capacity of the battery can be reduced.

  6. Modeling of capacitor charging dynamics in an energy harvesting system considering accurate electromechanical coupling effects

    Science.gov (United States)

    Bagheri, Shahriar; Wu, Nan; Filizadeh, Shaahin

    2018-06-01

    This paper presents an iterative numerical method that accurately models an energy harvesting system charging a capacitor with piezoelectric patches. The constitutive relations of piezoelectric materials connected with an external charging circuit with a diode bridge and capacitors lead to the electromechanical coupling effect and the difficulty of deriving accurate transient mechanical response, as well as the charging progress. The proposed model is built upon the Euler-Bernoulli beam theory and takes into account the electromechanical coupling effects as well as the dynamic process of charging an external storage capacitor. The model is validated through experimental tests on a cantilever beam coated with piezoelectric patches. Several parametric studies are performed and the functionality of the model is verified. The efficiency of power harvesting system can be predicted and tuned considering variations in different design parameters. Such a model can be utilized to design robust and optimal energy harvesting system.

  7. Using Residential Solar PV Quote Data to Analyze the Relationship Between Installer Pricing and Firm Size

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-19

    We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.

  8. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, F.; Sinclair, K.

    2012-03-01

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  9. Accurate Complex Systems Design: Integrating Serious Games with Petri Nets

    Directory of Open Access Journals (Sweden)

    Kirsten Sinclair

    2016-03-01

    Full Text Available Difficulty understanding the large number of interactions involved in complex systems makes their successful engineering a problem. Petri Nets are one graphical modelling technique used to describe and check proposed designs of complex systems thoroughly. While automatic analysis capabilities of Petri Nets are useful, their visual form is less so, particularly for communicating the design they represent. In engineering projects, this can lead to a gap in communications between people with different areas of expertise, negatively impacting achieving accurate designs.In contrast, although capable of representing a variety of real and imaginary objects effectively, behaviour of serious games can only be analysed manually through interactive simulation. This paper examines combining the complementary strengths of Petri Nets and serious games. The novel contribution of this work is a serious game prototype of a complex system design that has been checked thoroughly. Underpinned by Petri Net analysis, the serious game can be used as a high-level interface to communicate and refine the design.Improvement of a complex system design is demonstrated by applying the integration to a proof-of-concept case study.   

  10. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-05-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory’s (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude.

  11. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    International Nuclear Information System (INIS)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-01-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory's (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude

  12. 46 CFR 56.97-40 - Installation tests.

    Science.gov (United States)

    2010-10-01

    ... attached to boilers by welding without practical means of blanking off for testing, the piping shall be...) Fixed oxygen-acetylene system piping. (b) Installation testing requirements for refrigeration, fluid...

  13. Mineral insulated thermocouples - installation in steam generating plant

    International Nuclear Information System (INIS)

    Bridges, W.J.; Brown, J.F.

    1980-01-01

    The main areas of interest considered are Central Station Fossil Fuel fired boilers of around 500 MW capacity, AGR Boilers, and Industrial and Research Development projects. While the requirement for temperature measurement in each of these areas may vary the techniques adopted to overcome installation and protection problems created by thermal, chemical and mechanical hazards remain basically the same. The reasons for temperature measurement are described together with methods of attachment development and procedures for protection of the thermocouple along its route length until its exit from the hazardous environment. These relative accuracies of the different attachments are discussed along with factors influencing the life of the thermocouple. In many instances thermocouple installation is either a once only opportunity and/or an expensive exercise. It is therefore essential to develop and apply an effective quality control system during the installation phase. An effective system is described. Finally, a brief outline of possible future trends is given. (author)

  14. Reduction of Dynamic Loads in Mine Lifting Installations

    Science.gov (United States)

    Kuznetsov, N. K.; Eliseev, S. V.; Perelygina, A. Yu

    2018-01-01

    Article is devoted to a problem of decrease in the dynamic loadings arising in transitional operating modes of the mine lifting installations leading to heavy oscillating motions of lifting vessels and decrease in efficiency and reliability of work. The known methods and means of decrease in dynamic loadings and oscillating motions of the similar equipment are analysed. It is shown that an approach based on the concept of the inverse problems of dynamics can be effective method of the solution of this problem. The article describes the design model of a one-ended lifting installation in the form of a two-mass oscillation system, in which the inertial elements are the mass of the lifting vessel and the reduced mass of the engine, reducer, drum and pulley. The simplified mathematical model of this system and results of an efficiency research of an active way of reduction of dynamic loadings of lifting installation on the basis of the concept of the inverse problems of dynamics are given.

  15. Remote system for monitoring and control of controlled area of nuclear installation

    Energy Technology Data Exchange (ETDEWEB)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto [Departamento de Ciencias da Administracao e Tecnologia. Centro Universitario de Araraquara (UNIARA) Araraquara, SP (Brazil); Farias, Marcos Sant' anna de; Santos, Isaac J.A. Luquetti dos, E-mail: luquetti@ien.gov.br [Instituto Engenharia Nuclear (IEN/CNEN-RJ), Rio Janeiro, RJ (Brazil). Divisao de Instrumentacao e Confiabilidade Humana

    2011-07-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  16. Remote system for monitoring and control of controlled area of nuclear installation

    International Nuclear Information System (INIS)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto; Farias, Marcos Sant'anna de; Santos, Isaac J.A. Luquetti dos

    2011-01-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  17. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  18. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  19. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  20. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    International Nuclear Information System (INIS)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-01

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component

  1. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  2. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  3. Proposal for the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system. Following a market survey carried out among 61 firms in ten Member States and 14 firms in three non-Member States, a call for tenders (IT-2624/EP/ATLAS) was sent on 19 April 2002 to four firms and three consortia in six Member States and two firms in one non-Member State. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE ITALIA (IT), the lowest bidder, for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system for a total amount not exceeding 2 840 000 euros (4 191 300 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. This procurement will be financed by the ATLAS Common Fund and CERN's contribution will not exceed 8...

  4. Flow Rate Measurement Using 99mTc Radiotracer Method in a Pipe Installation

    International Nuclear Information System (INIS)

    Sipaun, S. M.; Bakar, A. Q. Abu; Othman, N.; Shaari, M. R.; Adnan, M. A. K.; Yusof, J. Mohd; Demanah, R.

    2010-01-01

    Flow rate is a significant parameter for managing processes in chemical processing plants and water processing facility. Accurate measurement of the flow rate allows engineers to monitor the delivery of process material, which in turn impacts a plant's capacity to produce their products. One of the available methods for determining the flow rate of a process material is by introducing a radiotracer to the system that mimics the material's flow pattern. In this study, a low activity Technetium-99m radioisotope was injected into a water piping setup and the 2'' x 2'' NaI (Tl) detectors were calibrated to detect spectrum peaks at specific points of the pipe installation. Using pulse velocity method, water flow rate was determined to be 11.3 litres per minute. For the sampling method, at different pump capacity, the flow rate was 15.0 litres per minute.

  5. Plant process computer replacements - techniques to limit installation schedules and costs

    International Nuclear Information System (INIS)

    Baker, M.D.; Olson, J.L.

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested

  6. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  7. Measure Guideline: Combined Space and Water Heating Installation and Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, B. [NorthernSTAR Building America Partnership, St. Paul, MN (United States); Bohac, D. [NorthernSTAR Building America Partnership, St. Paul, MN (United States); Huelman, P. [NorthernSTAR Building America Partnership, St. Paul, MN (United States)

    2017-03-01

    Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

  8. Measure Guideline: Combined Space and Water Heating Installation and Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, B. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Bohac, D. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Huelman, P. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership

    2017-03-03

    Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

  9. Economic and environmental assessment of rooftops regarding suitability for photovoltaic systems installation based on remote sensing data

    International Nuclear Information System (INIS)

    Lukač, Niko; Seme, Sebastijan; Dežan, Katarina; Žalik, Borut; Štumberger, Gorazd

    2016-01-01

    Within the last few years, the increase of the world's energy consumption has substantially impacted the environment. Solar energy initiative is more than ever involved to tackle this issue, especially when deploying PV (photovoltaic) systems over large-scale residential areas. However, not all surfaces in these areas are economically suitable, while some surfaces have low CO_2 mitigation. With the availability of high-resolution remote sensing data, the estimation of suitable rooftops for PV systems installation can be performed automatically by estimating the PV potential. This paper presents a novel method for estimating NPV (net present value) of the potential PV systems installed on rooftops by using LiDAR (Light Detection And Ranging) data and PV systems' nonlinear efficiency characteristics. More importantly, the environmental impact is estimated for each rooftop through EPBT (energy payback time) and GGER (greenhouse gas emission rate), based on the life-cycle of a specific PV system. This is combined with NPV in order to find rooftops that are both economically and environmentally viable candidates for PV systems deployment. Results demonstrate a case study LiDAR data for predicting each building's economical and environmental impact, as well as providing an overall view of resulting cumulative CO_2 mitigation over large residential area. - Highlights: • The method relies on PV potential estimation over LiDAR remote sensing data. • Novel economic assessment of PV systems using remote sensing data is proposed. • Environmental analysis of PV systems based on EPBT and GGER is performed. • Estimation of CO_2 mitigation over LiDAR data by considering national energy network.

  10. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  11. A system for accurate on-line measurement of total gas consumption or production rates in microbioreactors

    NARCIS (Netherlands)

    van Leeuwen, Michiel; Heijnen, Joseph J.; Gardeniers, Johannes G.E.; Oudshoorn, Arthur; Noorman, Henk; Visser, Jan; van der Wielen, Luuk A.M.; van Gulik, Walter M.

    2009-01-01

    A system has been developed, based on pressure controlled gas pumping, for accurate measurement of total gas consumption or production rates in the nmol/min range, applicable for on-line monitoring of bioconversions in microbioreactors. The system was validated by carrying out a bioconversion with

  12. Policy and systems analysis for nuclear installation decommissioning

    International Nuclear Information System (INIS)

    Gu Jiande

    1995-01-01

    On the basis of introducing into principal concept for nuclear installation decommissioning, form policy, sciences point of view, the author analyses present problems in the policy, the administrative and programme for decommissioning work in China. According to the physical process of decommissioning, the author studied engineering economics, derived method and formulas to estimate decommissioning cost. It is pointed out that basing on optimization principle for radiation protection and analysing cost-benefit for decommissioning engineering, the corresponding policy decision can be made

  13. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  14. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  15. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  16. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  17. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  18. Solar heating and hot water system installed at Municipal Building complex, Abbeville, South Carolina

    Science.gov (United States)

    1979-01-01

    Information on the solar energy system installed at the new municipal building for the City of Abbeville, SC is presented, including a description of solar energy system and buildings, lessons learned, and recommendations. The solar space heating system is a direct air heating system. The flat roof collector panel was sized to provide 75% of the heating requirement based on an average day in January. The collectors used are job-built with two layers of filon corrugated fiberglass FRP panels cross lapped make up the cover. The storage consists of a pit filled with washed 3/4 in - 1 1/2 in diameter crushed granite stone. The air handler includes the air handling mechanism, motorized dampers, air circulating blower, sensors, control relays and mode control unit. Solar heating of water is provided only those times when the hot air in the collector is exhausted to the outside.

  19. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  20. Economic viability of present-day biomass energy installations; Wirtschaftlichkeit von heutigen Biomasse-Energieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Markus Sommerhalder, M; Schelske, O [Ernst Basler und Partner AG, Zuerich (Switzerland); Nussbaumer, T [Verenum, Zuerich (Switzerland); Engeli, H [Engeli Engineering, Neerach (Switzerland); Membrez, Y; Ndoh, M; Tacchini, C [EREP SA, Aclens (Switzerland)

    2007-03-15

    This illustrated, comprehensive report for the Swiss Federal Office of Energy (SFOE) takes a look at the economic viability of biomass energy installations. The installations examined included wood-fired installations, biogas installations and those using bio-diesel and bio-ethanol. The system boundaries involved are defined and various factors that influence cost calculations are examined. The resulting heat and electricity prices for various energy sources and systems are presented and discussed. Examples of small and large-scale installations are presented. For wood-energy, combined heat and power system producing electricity at powers of 1 to 5 MWe are looked at and the various factors influencing their viability are discussed. Biogas installations of various sizes are discussed and the differing investment costs involved are commented on. Here, large industrial installations using communal green wastes are also examined and the influence of communal waste-collection charges on the price for the electricity generated is discussed, as is the influence of the market for the residual compost produced. The production and use of biogas in public wastewater treatment plants is also looked at, including the use of co-substrates. As far as biogenic liquid fuels such as bio-diesel and bio-ethanol are concerned, the report takes a brief look at the situation concerning installations in Switzerland and reviews the production costs involved. Various conclusions are drawn for the various energy sources reviewed as well as for the prices for heat and electrical energy obtained.

  1. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    Energy Technology Data Exchange (ETDEWEB)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

  2. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    International Nuclear Information System (INIS)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE's Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry

  3. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-22

    Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning around 2010 with the emergence of alternative customer financing options.

  4. Nuclear ventilation installations. Method of control of the scrubbing coefficient of iodine trap

    International Nuclear Information System (INIS)

    1982-12-01

    The present standard aims at defining a method to control the scrubbing coefficient of radioactive iodine trapping systems, used in nuclear ventilation installations. It applies to the installations where the trapping, efficiency of radioactive iodine has to be known, tested and compared to a reference value generally included in the safety reports. It applies to the installations where the absolute pressure of the air in the ventilation systems is above 1,4. 10 5 Pa (1,4 Bar) [fr

  5. Installations of SNCR on bark-fired boilers; Uppfoeljning av SNCR-installationer paa barkpannor

    Energy Technology Data Exchange (ETDEWEB)

    Hjalmarsson, A.K.; Hedin, K. [AaF-Energikonsult, Stockholm (Sweden); Andersson, Lars [AaF-IPK (Sweden)

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO{sub x} reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO{sub 2}/MJ fuel input and the NO{sub x} reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  6. Remote handling installation of diagnostics in the JET Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Allan, P., E-mail: Peter.Allan@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Loving, A.B. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Omran, H. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom); Collins, S.; Thomas, J. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Parsloe, A.; Merrigan, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); British Nuclear Services, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Hassall, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom)

    2011-10-15

    The requirement for an upgrade of the diagnostics for the JET ITER Like Wall (ILW) while maintaining personnel exposure to contamination as low as reasonably practicable or ALARP, has necessitated the development of a bespoke set of diagnostic components. These components, by virtue of their design and location, require a versatile yet comprehensive suite of remote handling tools to undertake their in-vessel installation. The installation of the various diagnostic components is covered in multiple tasks. Each task requires careful assessment and design of tools that can successfully interface with the components and comply with the handling and installation requirements. With remote maintenance a requirement, the looms/conduits were designed to be modular with connections which are electrically connected when the module is fitted or conversely disconnected when removed. The shape of each complex and often bulky component is verified during the design phase, to ensure that it can be delivered and installed to its specified location in the torus. This is done by matching the kinematic capabilities of the remote handling system and the path of the component through the torus by using a state of the art virtual reality system.

  7. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  8. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  9. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  10. Two year performance of a 10 kW CPV system installed in two areas of Saudi Arabia

    Science.gov (United States)

    Khonkar, Hussam; Alowais, Abdullah; Sheikho, Ayman; Alyahya, Abdulaziz; Alghamdi, Ahmed; Alsaedan, Abdullah; Eugenio, Nunilo N.; Alalweet, Fahad; Halawani, Mohammad; Alsaferan, Abdulrahman

    2014-09-01

    The three year KACST/IBM collaboration in solar technology research led to the design and development of a 10kW CPV system. The system is comprised of 81 PV modules, inverters and a tracking system and is grid connected. A primary and secondary optics were employed to reach 1600x concentration on multijunction solar cells. Two CPV trackers were installed in the city of Riyadh and one in the eastern coastal city of Al Khafji. These two areas differ in climatic conditions. Riyadh is mostly dry and very often hit by very strong sand storms while Al Khafji is very humid with sand storms. Very fine dusts and dirt carried by the storms hits the surface of the primary optics, Fresnel lens, of the system. In Riyadh, the particles stick to the lenses but accumulation in the surface is not much since it is blown away by wind. However, the humid condition of the coastal areas wets the dusts and makes it sticky, cumulating more dusts and dirt. This paper discusses in details the parts of the 10kW CPV system. It presents a comprehensive analysis of the system's performance since the time they were installed and operated. CPV systems are operated with the least number of personnel and supervision. However, dust and dirt lessens the amount of sunlight passing through the primary optics. It requires periodic cleaning of the Fresnel lens. Different methods of cleaning were tried to identify the efficient way to clean the system that results to a higher power generation. Corrections and modifications of the system to further increase power production are presented.

  11. Effectiveness of Physical Barriers Installation for Prevention of Incidents in Mexico City’s Subway System

    OpenAIRE

    Portillo-Villasana, Gerardo de Jesús; Huerta-Barrientos, Aida; Dillarza Andrade, Yazmin

    2017-01-01

    Nowadays, suicides inside the installations of subway platforms are considered a public health problem in Mexico City. One solution to prevent them is the installation of physical barriers, but their high cost is unattractive for governmental authorities. Traditional approaches of research on the effectiveness of physical barriers for preventing suicides have been limited to analyzing statistically the effects of installing platform screen doors and blue lights on subway platforms. Although c...

  12. A new gas stripper system for BARC-TIFR Pelletron Accelerator facility: installation and preliminary results

    International Nuclear Information System (INIS)

    Sharma, S.C.; Ninawe, N.G.; Yadav, M.L.; Ekambaram, M.; Ramjilal; Matkar, U.V.; Ansari, Q.N.; Lokare, R.N.; Ramlal; Gupta, A.K.; Bhagwat, P.V.; Pillay, R.G.

    2009-01-01

    The gas-stripper plays a key role in stripping the heavy and molecular ion beams in a tandem accelerator. Efficiency of gas stripper depends on its supporting vacuum pumps. A new recirculating turbo molecular pump-based gas stripper has been installed in the high voltage terminal of Pelletron Accelerator. Re-circulating the stripper gas reduces the flow of gas into the accelerating tubes reducing the transmission losses. Preliminary results obtained using the new gas stripper system are discussed. (author)

  13. A new model with an anatomically accurate human renal collecting system for training in fluoroscopy-guided percutaneous nephrolithotomy access.

    Science.gov (United States)

    Turney, Benjamin W

    2014-03-01

    Obtaining renal access is one of the most important and complex steps in learning percutaneous nephrolithotomy (PCNL). Ideally, this skill should be practiced outside the operating room. There is a need for anatomically accurate and cheap models for simulated training. The objective was to develop a cost-effective, anatomically accurate, nonbiologic training model for simulated PCNL access under fluoroscopic guidance. Collecting systems from routine computed tomography urograms were extracted and reformatted using specialized software. These images were printed in a water-soluble plastic on a three-dimensional (3D) printer to create biomodels. These models were embedded in silicone and then the models were dissolved in water to leave a hollow collecting system within a silicone model. These PCNL models were filled with contrast medium and sealed. A layer of dense foam acted as a spacer to replicate the tissues between skin and kidney. 3D printed models of human collecting systems are a useful adjunct in planning PCNL access. The PCNL access training model is relatively low cost and reproduces the anatomy of the renal collecting system faithfully. A range of models reflecting the variety and complexity of human collecting systems can be reproduced. The fluoroscopic triangulation process needed to target the calix of choice can be practiced successfully in this model. This silicone PCNL training model accurately replicates the anatomic architecture and orientation of the human renal collecting system. It provides a safe, clean, and effective model for training in accurate fluoroscopy-guided PCNL access.

  14. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  15. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  16. Using an Educational Electronic Documentation System to Help Nursing Students Accurately Identify Nursing Diagnoses

    Science.gov (United States)

    Pobocik, Tamara J.

    2013-01-01

    The use of technology and electronic medical records in healthcare has exponentially increased. This quantitative research project used a pretest/posttest design, and reviewed how an educational electronic documentation system helped nursing students to identify the accurate related to statement of the nursing diagnosis for the patient in the case…

  17. Data Analysis of the TK-1G Sounding Rocket Installed with a Satellite Navigation System

    Directory of Open Access Journals (Sweden)

    Lesong Zhou

    2017-10-01

    Full Text Available This article gives an in-depth analysis of the experimental data of the TK-1G sounding rocket installed with the satellite navigation system. It turns out that the data acquisition rate of the rocket sonde is high, making the collection of complete trajectory and meteorological data possible. By comparing the rocket sonde measurements with those obtained by virtue of other methods, we find that the rocket sonde can be relatively precise in measuring atmospheric parameters within the scope of 20–60 km above the ground. This establishes the fact that the TK-1G sounding rocket system is effective in detecting near-space atmospheric environment.

  18. An Accurate Computational Tool for Performance Estimation of FSO Communication Links over Weak to Strong Atmospheric Turbulent Channels

    Directory of Open Access Journals (Sweden)

    Theodore D. Katsilieris

    2017-03-01

    Full Text Available The terrestrial optical wireless communication links have attracted significant research and commercial worldwide interest over the last few years due to the fact that they offer very high and secure data rate transmission with relatively low installation and operational costs, and without need of licensing. However, since the propagation path of the information signal, i.e., the laser beam, is the atmosphere, their effectivity affects the atmospheric conditions strongly in the specific area. Thus, system performance depends significantly on the rain, the fog, the hail, the atmospheric turbulence, etc. Due to the influence of these effects, it is necessary to study, theoretically and numerically, very carefully before the installation of such a communication system. In this work, we present exactly and accurately approximate mathematical expressions for the estimation of the average capacity and the outage probability performance metrics, as functions of the link’s parameters, the transmitted power, the attenuation due to the fog, the ambient noise and the atmospheric turbulence phenomenon. The latter causes the scintillation effect, which results in random and fast fluctuations of the irradiance at the receiver’s end. These fluctuations can be studied accurately with statistical methods. Thus, in this work, we use either the lognormal or the gamma–gamma distribution for weak or moderate to strong turbulence conditions, respectively. Moreover, using the derived mathematical expressions, we design, accomplish and present a computational tool for the estimation of these systems’ performances, while also taking into account the parameter of the link and the atmospheric conditions. Furthermore, in order to increase the accuracy of the presented tool, for the cases where the obtained analytical mathematical expressions are complex, the performance results are verified with the numerical estimation of the appropriate integrals. Finally, using

  19. Installation of Monte Carlo neutron and photon transport code system MCNP4

    International Nuclear Information System (INIS)

    Takano, Makoto; Sasaki, Mikio; Kaneko, Toshiyuki; Yamazaki, Takao.

    1993-03-01

    The continuous energy Monte Carlo code MCNP-4 including its graphic functions has been installed on the Sun-4 sparc-2 work station with minor corrections. In order to validate the installed MCNP-4 code, 25 sample problems have been executed on the work station and these results have been compared with the original ones. And, the most of the graphic functions have been demonstrated by using 3 sample problems. Further, additional 14 nuclides have been included to the continuous cross section library edited from JENDL-3. (author)

  20. Manufacture and installation of JET MKII divertor support structure

    International Nuclear Information System (INIS)

    Celentano, G.; Altmann, H.; Macklin, B.; Miele, P.; Pick, M.A.; Tait, J.; Moletta, L.; Romagnolo, A.; Shaw, R.

    1995-01-01

    The water cooled support structure, comprising twenty-four modules is the main component of the JET MKII divertor system. It is to be installed in the vacuum vessel with high accuracy with respect to the magnetic center and the other in-vessel components. The paper describes the design and manufacturing cycle including the required tolerances, the assembly and installation method and the material production process required to ensure the accuracy and reliability of the MKII support structure system. The water cooling holes, machined into the support structure require the procurement of special material to prevent risks of leaks inside the vacuum vessel

  1. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  2. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  3. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  4. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  5. Evaluation of the Photovoltaic System Installation Impact to an Electric Power Grid Part 1: Simulation of photovoltaic generation by applying a meteorological model

    Directory of Open Access Journals (Sweden)

    Juan Ernesto Wyss Porras

    2015-12-01

    Full Text Available The impact of the installation of a large-scale photovoltaic (PV system to the electric power grid management is analyzed numerically in this series of works. In this part 1, the solar irradiance at the target country, Guatemala, is evaluated with a weather forecasting model, and PV energy potential is estimated. From the computed potential distribution, the appropriate area for installation of a large-scale PV system is selected. This area is where the solar irradiance is large and the energy consumption regions are close by. The optimal tilted angle of the PV panels is proposed as well from the PV output simulation. The time series data of the PV output is also evaluated in this part, and it will be applied to the analysis of the impact of the PV installation to the electric power grid management in the following part of this series of works.

  6. Software of microcomputer ELEKTRONIKA-60 installed in the control system of the measuring projector PUOS-4

    International Nuclear Information System (INIS)

    Dikij, V.M.; Nekipelova, G.D.; Shakhbazyan, V.V.; Yurpalov, V.D.

    1990-01-01

    The tasks, structure and aspects of realization of servodrivers of the PUOS-4 measuring projector (measuring carriage, tape transport) on the installed ELEKTRONIKA-60 microcomputer operating in the multi-machine system of film information preprocessing, are considered. Realizability of drivers is estimated under rigid operation conditions using the RTM60 real time monitor. The problem of the projector testing is also considered. 11 refs.; 5 figs.; 1 tab

  7. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  8. A Flexible Fringe Projection Vision System with Extended Mathematical Model for Accurate Three-Dimensional Measurement.

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2016-04-28

    In order to acquire an accurate three-dimensional (3D) measurement, the traditional fringe projection technique applies complex and laborious procedures to compensate for the errors that exist in the vision system. However, the error sources in the vision system are very complex, such as lens distortion, lens defocus, and fringe pattern nonsinusoidality. Some errors cannot even be explained or rendered with clear expressions and are difficult to compensate directly as a result. In this paper, an approach is proposed that avoids the complex and laborious compensation procedure for error sources but still promises accurate 3D measurement. It is realized by the mathematical model extension technique. The parameters of the extended mathematical model for the 'phase to 3D coordinates transformation' are derived using the least-squares parameter estimation algorithm. In addition, a phase-coding method based on a frequency analysis is proposed for the absolute phase map retrieval to spatially isolated objects. The results demonstrate the validity and the accuracy of the proposed flexible fringe projection vision system on spatially continuous and discontinuous objects for 3D measurement.

  9. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  10. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  11. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    Energy Technology Data Exchange (ETDEWEB)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance of the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.

  12. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    1999-01-01

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance of the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year

  13. 46 CFR 115.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...

  14. Accurate formulas for the penalty caused by interferometric crosstalk

    DEFF Research Database (Denmark)

    Rasmussen, Christian Jørgen; Liu, Fenghai; Jeppesen, Palle

    2000-01-01

    New simple formulas for the penalty caused by interferometric crosstalk in PIN receiver systems and optically preamplified receiver systems are presented. They are more accurate than existing formulas.......New simple formulas for the penalty caused by interferometric crosstalk in PIN receiver systems and optically preamplified receiver systems are presented. They are more accurate than existing formulas....

  15. FY 1998 report on the results of the New Sunshine Project - Development of the commercialization technology of the photovoltaic power system. Verification study of the photovoltaic power system - Research on engineering methods for cost effective PV installation; 1998 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden system no jissho kenkyu (tashu secchi koho no kenkyu kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the purpose of promoting installations of PV system and making use of the unused space for which a rise in the PV demand equal to that in houses, building roofs, etc. is expected, examination/research for much newer forms of land installation are proceeded with, and evaluation/verification of reliability/durability are conducted of new installation processes using thin film solar cells, adhesives, etc. In this fiscal year, study of the development/verification of low cost floating pedestal was promoted, and at the same time, examinational study of forms of land installation was made. As to the development of low cost floating pedestal, the module type flexible floating pedestal was developed as a small prototype pedestal and tested for installation in a pool. Survey was also carried out of geometry, mooring systems, materials, design conditions, and existing instances of different floats, and measures were studied for the effective use of the floating system. In relation to reliability and durability evaluation of the new installation process, the verification operation of evaluation facilities for various installation processes was continued, and the power generation capacity was made clear in special forms of installation such as installations on vertical/horizontal surfaces. And the study was made of the large area frameless structure, building use double glass structure, and durability of the adhesive/adhesive tape process of thin film solar cells. (NEDO)

  16. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  17. A GPS Sensing Strategy for Accurate and Energy-Efficient Outdoor-to-Indoor Handover in Seamless Localization Systems

    Directory of Open Access Journals (Sweden)

    Yungeun Kim

    2012-01-01

    Full Text Available Indoor localization systems typically locate users on their own local coordinates, while outdoor localization systems use global coordinates. To achieve seamless localization from outdoors to indoors, a handover technique that accurately provides a starting position to the indoor localization system is needed. However, existing schemes assume that a starting position is known a priori or uses a naïve approach to consider the last location obtained from GPS as the handover point. In this paper, we propose an accurate handover scheme that monitors the signal-to-noise ratio (SNR of the effective GPS satellites that are selected according to their altitude. We also propose an energy-efficient handover mechanism that reduces the GPS sampling interval gradually. Accuracy and energy efficiency are experimentally validated with the GPS logs obtained in real life.

  18. Impact of PID on industrial rooftop PV-installations

    Science.gov (United States)

    Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.

    2017-08-01

    Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.

  19. Preliminary measurements on the new TOF system installed at the AMS beamline of INFN-LABEC

    Energy Technology Data Exchange (ETDEWEB)

    Palla, L., E-mail: palla@fi.infn.it [Dipartimento di Fisica, Università di Pisa, e INFN Sezione di Pisa (Italy); Castelli, L. [INFN Sezione di Firenze (Italy); Czelusniak, C. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Fedi, M.E. [INFN Sezione di Firenze (Italy); Giuntini, L. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Liccioli, L. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Mandò, P.A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Martini, M. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Mazzinghi, A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Ruberto, C. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Schiavulli, L. [Dipartimento di Fisica, Università di Bari, e INFN Sezione di Bari (Italy); Sibilia, E. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Taccetti, F. [INFN Sezione di Firenze (Italy)

    2015-10-15

    A high resolution time of flight (TOF) system has been developed at LABEC, the 3 MV Tandem accelerator laboratory in Florence, in order to improve the sensitivity of AMS measurements on carbon samples with ultra-low concentration and also to measure other isotopes, such as {sup 129}I. The system can be employed to detect and identify residual interfering particles originated from the break-up of molecular isobars. The set-up has been specifically designed for low energy heavy ions: it consists of two identical time pick-off stations, each made up of a thin conductive foil and a Micro-Channel Plate (MCP) multiplier. The beamline is also equipped with a silicon detector, installed downstream the stop TOF station. In this paper the design of the new system and the implemented readout electronics are presented. The tests performed on the single time pick-off station are reported: they show that the maximum contribution to the timing resolution given by both the intrinsic MCP resolution and the electronics is ⩽500 ps (FWHM). For these tests, single particle pulsed beams of 2–5 MeV protons and 10 MeV {sup 12}C{sup 3+} ions, to simulate typical AMS conditions, were used. The preliminary TOF and TOF-E (TOF-energy) measurements performed with carbon beams after the installation of the new system on the AMS beam line are also discussed. These measurements were performed using the foil–MCP as the start stage and a silicon detector as the stop stage. The spectra acquired with carbon ions suggest the presence of a small residual background from neighboring masses reaching the end of the beamline with the same energy as the rare isotope.

  20. Preliminary measurements on the new TOF system installed at the AMS beamline of INFN-LABEC

    International Nuclear Information System (INIS)

    Palla, L.; Castelli, L.; Czelusniak, C.; Fedi, M.E.; Giuntini, L.; Liccioli, L.; Mandò, P.A.; Martini, M.; Mazzinghi, A.; Ruberto, C.; Schiavulli, L.; Sibilia, E.; Taccetti, F.

    2015-01-01

    A high resolution time of flight (TOF) system has been developed at LABEC, the 3 MV Tandem accelerator laboratory in Florence, in order to improve the sensitivity of AMS measurements on carbon samples with ultra-low concentration and also to measure other isotopes, such as "1"2"9I. The system can be employed to detect and identify residual interfering particles originated from the break-up of molecular isobars. The set-up has been specifically designed for low energy heavy ions: it consists of two identical time pick-off stations, each made up of a thin conductive foil and a Micro-Channel Plate (MCP) multiplier. The beamline is also equipped with a silicon detector, installed downstream the stop TOF station. In this paper the design of the new system and the implemented readout electronics are presented. The tests performed on the single time pick-off station are reported: they show that the maximum contribution to the timing resolution given by both the intrinsic MCP resolution and the electronics is ⩽500 ps (FWHM). For these tests, single particle pulsed beams of 2–5 MeV protons and 10 MeV "1"2C"3"+ ions, to simulate typical AMS conditions, were used. The preliminary TOF and TOF-E (TOF-energy) measurements performed with carbon beams after the installation of the new system on the AMS beam line are also discussed. These measurements were performed using the foil–MCP as the start stage and a silicon detector as the stop stage. The spectra acquired with carbon ions suggest the presence of a small residual background from neighboring masses reaching the end of the beamline with the same energy as the rare isotope.

  1. Cooling systems for efficient operation of induction heating installations; Kuehlsysteme fuer den effizienten Betrieb von Induktionsschmelzanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Doetsch, Erwin; Schmidt, Juergen [ABP Induction Systems GmbH, Dortmund (Germany)

    2009-12-15

    Electrical and thermal losses in the system components of induction melting systems are mainly carried off by the cooling water. The design and maintenance of the corresponding cooling systems play a decisive role in the operating reliability of induction installations. Due to the differing requirements made on water quality, cooling of the furnace and the electrical components is generally accomplished by means of two independent cooling circuits, which are described below. The article also examines utilization of waste-heat, which has a particular significance for energy-efficiency, since more than a fourth of the furnace power, in the case of melting of ferrous materials, and more than half, in the case of non-ferrous materials, is lost. (orig.)

  2. Small-scale installations. Solar concentration system for architectural integration; Instalaciones de pequeno tamano. Sistema de concetracion solar para integracion arquitectonica

    Energy Technology Data Exchange (ETDEWEB)

    Chemisana, D.; Rosell, J.

    2010-07-01

    Concentration solar systems now practically limit its use in large installations with devices of considerable size, such as generator systems central tower parabolic trough concentrators for power generation. Disco-parabolic concentrators with Stirling engine or the great fans that support two-axis Fresnel lenses in combination with occasional multilayered cells with or without secondary concentrator. (Author) 11 refs.

  3. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  4. Study of accurate volume measurement system for plutonium nitrate solution

    Energy Technology Data Exchange (ETDEWEB)

    Hosoma, T. [Power Reactor and Nuclear Fuel Development Corp., Tokai, Ibaraki (Japan). Tokai Works

    1998-12-01

    It is important for effective safeguarding of nuclear materials to establish a technique for accurate volume measurement of plutonium nitrate solution in accountancy tank. The volume of the solution can be estimated by two differential pressures between three dip-tubes, in which the air is purged by an compressor. One of the differential pressure corresponds to the density of the solution, and another corresponds to the surface level of the solution in the tank. The measurement of the differential pressure contains many uncertain errors, such as precision of pressure transducer, fluctuation of back-pressure, generation of bubbles at the front of the dip-tubes, non-uniformity of temperature and density of the solution, pressure drop in the dip-tube, and so on. The various excess pressures at the volume measurement are discussed and corrected by a reasonable method. High precision-differential pressure measurement system is developed with a quartz oscillation type transducer which converts a differential pressure to a digital signal. The developed system is used for inspection by the government and IAEA. (M. Suetake)

  5. Musculoskeletal MRI: dedicated systems

    International Nuclear Information System (INIS)

    Masciocchi, C.; Barile, A.; Satragno, L.

    2000-01-01

    The ''dedicated'' MRI units have characteristics of high diagnostic accuracy and lower installation and management costs as compared with whole-body systems. The dedicated MRI units are easy to install. The low weight allows their installation also under unfavorable circumstances. In a dedicated system cost-effectiveness and ease of installation must be accompanied by the capability of providing high-quality images. In our experience, the high number of examinations performed, the most part of which provided with the surgical controls, allowed an accurate evaluation of the diagnostic potentialities of the dedicated magnet. We were not able to perform the examinations in only 3 % of cases due to the physical shape of the patient and the clinical condition of the patient which may hinder the correct positioning of the limb. The overlapping of the diagnostic accuracy of the E-scan and Artoscan units in the study of the lower limbs, compared with whole-body units and surgery, prompted us to exploit the potentialities of the E-Scan in the study of the shoulder. We had a good correlation between E-Scan, whole-body units, and surgical findings, which confirmed the high diagnostic accuracy of the dedicated system. In conclusion, in our experience carried out in the musculoskeletal system, the dedicated magnets showed promising results. Their diagnostic reliability and utility was comparable to that obtained from conventional units operating at higher magnetic fields. (orig.)

  6. Item 01: Peculiarities during installation of forced filtered venting system, units 3 and 4 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Dinev, D.

    2005-01-01

    The Forced Filtered Venting System (FFV) is designated to minimize the uncontrolled and unfiltered release of activity to the environment due to untightness of the confinement in case of a severe accident. In this paper the flow diagram of FFV, Units 3 and 4 is shown and the main components of the system which are installed in RB, in Rooms A 031/2, A032/3, A031/4, at elevation 2.10 m are described. Calculation models of the pipelines of FFV were developed based on the requirements to the design and the input data, which were collected and analyzed. The graphic part of the model is presented at calculation schemes. The pipelines are checked according to the requirements of the ASME Code and the equations for calculation of the connected pipelines are stipulated in ASME NC-3650. The enclosed photos illustrate the most relevant positions of the modifications. In conclusion the positive aspects of the mounting experience for this unique installation are analyzed and the weak points are stated aiming at the improvement of the quality of preparation, organization and complete performance for similar facilities

  7. Code of practice and design principles, for installed radiological protection systems

    International Nuclear Information System (INIS)

    Powell, R.G.

    1980-09-01

    The main points on which a guide for designers and installers of radiological protection instrumentation (RPI) should be based have been examined by a small group of instrumentation engineers. The purpose of this document is to present a comprehensive and detailed review of these points. It is intended to give an overall coverage and serve as a reference document for specific points; it should also be of value to newcomers to the RPI field. The code presents a standard of good practice and takes the form of recommendations only. The contents cover: the requirement for RPI; design, availability and reliability, information displays, human factors, power supplies, manufacture, quality assurance, testing, cost, installation, operation, maintenance and documentation. Appendices include: Radon and thoron decay series, air sampling, reliability of component combinations and redundancy. (28 references). (author)

  8. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  9. Training and certification of PV installers in Europe

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Tournaki, Stavroula; Gkouskos, Zacharias; Masson, Gaetan; Holden, John; Huidobro, Ana; Stoykova, Evelina; Rata, Camelia; Bacan, Andro; Maxoulis, Christos; Charalambous, Anthi

    2013-01-01

    The European strategy for the coming decades sets specific targets for a sustainable growth, including reaching a 20% share of renewables in final energy consumption till 2020. To achieve this target, a number of initiatives and measures have been in force. Europe, is currently the largest market for PV systems with more than 75% of the annual worldwide installations in 2011. The favourable European policies as well as the Member States’ supporting legislations have resulted in high market growth for photovoltaics. Applying PV technologies however, requires high qualified technicians to install, repair and maintain them. Until today, national markets have been growing faster than the skilled PV installers force can satisfy. The PVTRIN, an Intelligent Energy Europe action, addresses these issues by developing a training and certification scheme for technicians active in the installation and maintenance of small scale PV systems. During the implementation of the action, a market research was conducted in the six participating countries in order to record the stakeholders’ attitudes, perceptions and considerations and to adapt the training methods, tools and materials to the national PV industry requirements and markets’ needs. Indicative results of this analysis as well as the current situation regarding relevant training and certification schemes are presented in this paper. - Highlights: ► Market research in six EU countries on PV professional Training and Certification needs. ► PVTRIN scheme integrates the national legislations and the market's needs. ► The different aspects (technical, institutional, financial) are presented

  10. An accurate and efficient system model of iterative image reconstruction in high-resolution pinhole SPECT for small animal research

    Energy Technology Data Exchange (ETDEWEB)

    Huang, P-C; Hsu, C-H [Department of Biomedical Engineering and Environmental Sciences, National Tsing Hua University, Hsinchu, Taiwan (China); Hsiao, I-T [Department Medical Imaging and Radiological Sciences, Chang Gung University, Tao-Yuan, Taiwan (China); Lin, K M [Medical Engineering Research Division, National Health Research Institutes, Zhunan Town, Miaoli County, Taiwan (China)], E-mail: cghsu@mx.nthu.edu.tw

    2009-06-15

    Accurate modeling of the photon acquisition process in pinhole SPECT is essential for optimizing resolution. In this work, the authors develop an accurate system model in which pinhole finite aperture and depth-dependent geometric sensitivity are explicitly included. To achieve high-resolution pinhole SPECT, the voxel size is usually set in the range of sub-millimeter so that the total number of image voxels increase accordingly. It is inevitably that a system matrix that models a variety of favorable physical factors will become extremely sophisticated. An efficient implementation for such an accurate system model is proposed in this research. We first use the geometric symmetries to reduce redundant entries in the matrix. Due to the sparseness of the matrix, only non-zero terms are stored. A novel center-to-radius recording rule is also developed to effectively describe the relation between a voxel and its related detectors at every projection angle. The proposed system matrix is also suitable for multi-threaded computing. Finally, the accuracy and effectiveness of the proposed system model is evaluated in a workstation equipped with two Quad-Core Intel X eon processors.

  11. Procedure for Installing a photovoltaic system on roofs in Cuban Ron Corporation S.A

    International Nuclear Information System (INIS)

    Guzmán Villavicencio, Mayra; Águila Bernal, Inoel; Torres Águila, José M.; Soto Castellón, Carlos R.

    2017-01-01

    In this work, a methodological procedure developed from experiences gained during the project "Photovoltaic installation on the roofs of the Central Rum Factory for operation in self consumption and public MT grid connection” is presented, which was held along with UGAO-AINAIR signature. It is developed taking into account the need to further consolidate the dominance of this alternative energy technology, which is the first experience in such facilities for both, the rum industry and process industries in Cuba. There are no technical rules that regulate requirements to be considered during the conceptual stage of projects for the introduction of photovoltaic systems connected to the grid. The methodological procedure presented provides guidance for its application in other entities, resulting necessary its elaboration to ensure technical stability and reliability of systems during its life. (author)

  12. PPSL - the newly installed analytical system for the detection of irradiated food

    International Nuclear Information System (INIS)

    Guzik, G.P.; Stachowicz, W.

    2006-01-01

    Newly installed in the Laboratory for Detection of Irradiated Food at the beginning of 2005 Pulsed PhotoStimulated Luminescence method (PPSL) is described. Methodology of the PPSL examination of food is simple: the analysed sample is dispensed into a Petri dish in a thin layer and placed into a sample chamber. the sample is exposed to pulsed laser infra-red light emitted by an array of diodes (IR LEDs). The PPSL signal produced in the system by luminescence released from photostimulated mineral debris of the sample is stored by a photomultiplier and the created numerical signal transmitted to the PC. it has been found, that screening by means of the PPSL apparatus is easy, effective and inexpensive. The method provides the fastest way to gain results whether food product is irradiated

  13. Recommendations for the design and the installation of large laser scanning microscopy systems

    Science.gov (United States)

    Helm, P. Johannes

    2012-03-01

    Laser Scanning Microscopy (LSM) has since the inventions of the Confocal Scanning Laser Microscope (CLSM) and the Multi Photon Laser Scanning Microscope (MPLSM) developed into an essential tool in contemporary life science and material science. The market provides an increasing number of turn-key and hands-off commercial LSM systems, un-problematic to purchase, set up and integrate even into minor research groups. However, the successful definition, financing, acquisition, installation and effective use of one or more large laser scanning microscopy systems, possibly of core facility character, often requires major efforts by senior staff members of large academic or industrial units. Here, a set of recommendations is presented, which are helpful during the process of establishing large systems for confocal or non-linear laser scanning microscopy as an effective operational resource in the scientific or industrial production process. Besides the description of technical difficulties and possible pitfalls, the article also illuminates some seemingly "less scientific" processes, i.e. the definition of specific laboratory demands, advertisement of the intention to purchase one or more large systems, evaluation of quotations, establishment of contracts and preparation of the local environment and laboratory infrastructure.

  14. Heritage plaza parking lots improvement project- Solar PV installation

    Energy Technology Data Exchange (ETDEWEB)

    Hooks, Todd [Agua Caliente Indian Reservation, Palm Springs, CA (United States)

    2017-03-31

    The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.

  15. PEP liquid level system

    International Nuclear Information System (INIS)

    Lauritzen, T.; Sah, R.C.

    1981-03-01

    A liquid level system has been installed in the accelerator housing of the PEP storage ring. This instrument spans the entire 2.2 km circumference of the PEP project, and over one hundred readouts provide reference elevations which are used for the accurate alignment of accelerator components. The liquid level has proven to be extremely precise (+-0.10 mm) and quick to use, and it has contributed to the accurate alignment of PEP before beam turn-on. Since the liquid level readouts are rigidly attached to the accelerator housing, the liquid level has been a convenient means to monitor the settling of the accelerator housing

  16. Laser guided automated calibrating system for accurate bracket ...

    African Journals Online (AJOL)

    It is widely recognized that accurate bracket placement is of critical importance in the efficient application of biomechanics and in realizing the full potential of a preadjusted edgewise appliance. Aim: The purpose of ... placement. Keywords: Hough transforms, Indirect bonding technique, Laser, Orthodontic bracket placement ...

  17. Using Residential Solar PV Quote Data to Analyze the Relationship Between Installer Pricing and Firm Size

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-04-01

    The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low prices are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.

  18. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de

    1980-06-01

    The process of installation of nuclear power plants in the context of the Brazilian legal system is analysed. The structure of the political and administrative system related to the matter and the correspondent legislation are discussed. (A.L.) [pt

  19. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  20. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  1. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: safety environmental equipment (total system diagram, layout scheme drawing, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, outline drawing of operation control panel, operator console of the integrated load pressure control system, operator console of the integrated sequential control system, central control panel, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of cooler control panel of the main transformer, etc.), common facilities (total layout, diagram of the equipment cooling water pipe system, diagram of the fire-extinguishing water pipe system, etc.) In pictures of fabrication/installation, pictures of the following were included: gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, common facilities, etc. (NEDO)

  2. Installation and pre-commissioning of the cryogenic system of JT-60SA tokamak

    Science.gov (United States)

    Hoa, C.; Michel, F.; Roussel, P.; Fejoz, P.; Girard, S.; Goncalves, R.; Lamaison, V.; Natsume, K.; Kizu, K.; Koide, Y.; Yoshida, K.; Cardella, A.; Portone, A.; Verrecchia, M.; Wanner, M.; Beauvisage, J.; Bertholat, F.; Gaillard, G.; Heloin, V.; Langevin, B.; Legrand, J.; Maire, S.; Perrier, J. M.; Pudys, V.

    2017-02-01

    The cryogenic system for the superconducting tokamak JT-60SA is currently being commissioned in Naka, Japan and shall be ready for operation in summer 2016. This contribution is part of the Broader Approach agreement between Japan and Europe. With an equivalent refrigeration capacity of about 9.5 kW at 4.5 K the cryogenic system will supply cryo-pump panels at 3.7 K, superconducting magnets and their structures at 4.4 K, high temperature superconducting current leads at 50 K and thermal shields between 80 K and 100 K. The system has been specifically designed to handle large pulse loads at 4.4 K during plasma operation. The mechanical and electrical assembly of the cryogenic system has been achieved within six months by October 2015. The main contractor Air Liquide Advanced Technology (AL-aT) have supplied eight parallel working screw compressors with a common oil removal and dryer system, a Refrigeration Cold Box and an Auxiliary Cold box with cold rotating machines. F4E has provided six GHe storage vessels and QST has provided the complete infrastructure and the facilities for the utilities. The paper gives an overview of the main design features, the infrastructure and the status of installation and pre-commissioning.

  3. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    Science.gov (United States)

    2015-09-01

    compliant GIS, usually obtained from the installation itself. NZP also includes an appropriate weather file for the location selected, using the closest...such as solar photovoltaics, solar-thermal, wind energy, biomass (wood chips, etc.), biogas , or synthetic gas need to be considered as part of the mix...have better information. In some cases, such as photovoltaics, users can obtain data from an online system and enter it into NZP. In this case, users

  4. Systems-based modeling of generation variability under alternate geographic configurations of photovoltaic (PV) installations in Virginia

    International Nuclear Information System (INIS)

    Collins, Ross D.; Crowther, Kenneth G.

    2011-01-01

    With increased focus on renewable energy in our modern era, it is increasingly important to understand the impact of policies on the performance and reliability of regional energy systems. This research develops a model to understand how geographic dispersion of PV installations impacts the reliability of electricity generated from the total PV network, measured by the variance of the distribution of generated electricity. Using NREL data, beta probability distributions of sunlight (kWh/m 2 /day) in various regions of Virginia are estimated using a fitting method that minimizes the Kolmogorov-Smirnov test statistic. A Monte Carlo simulation model is developed to measure PV electricity generation from multiple centralized and dispersed configurations over 100,000 days of probabilistic sunlight. There is a calculable tradeoff between average generation and generation variability, and increased geographic dispersion of PV installations can decrease this variability. Controlling variable generation through policies that promote efficient PV siting can help provide reliable power, minimizing the need for load-balancing peaking power infrastructure and costly electricity purchases from the grid. Using a tradeoff framework of generation and costs, this paper shows that geographically dispersed generation can mitigate the risk of unreliable solar generation that can significantly impact the end-user costs and make PV infrastructure unattractive. - Highlights: → We model how uncertain sunlight affects generation of different PV systems. → We show that geographically dispersed systems decrease generation variability. → Geographically dispersed PV systems are potentially more costly in the short run. → Controlling variability provides reliable power, which can decrease long-run costs. → Promoting mixes of uncertain energy sources requires assessment of these tradeoffs.

  5. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  6. A Flexible Fringe Projection Vision System with Extended Mathematical Model for Accurate Three-Dimensional Measurement

    Directory of Open Access Journals (Sweden)

    Suzhi Xiao

    2016-04-01

    Full Text Available In order to acquire an accurate three-dimensional (3D measurement, the traditional fringe projection technique applies complex and laborious procedures to compensate for the errors that exist in the vision system. However, the error sources in the vision system are very complex, such as lens distortion, lens defocus, and fringe pattern nonsinusoidality. Some errors cannot even be explained or rendered with clear expressions and are difficult to compensate directly as a result. In this paper, an approach is proposed that avoids the complex and laborious compensation procedure for error sources but still promises accurate 3D measurement. It is realized by the mathematical model extension technique. The parameters of the extended mathematical model for the ’phase to 3D coordinates transformation’ are derived using the least-squares parameter estimation algorithm. In addition, a phase-coding method based on a frequency analysis is proposed for the absolute phase map retrieval to spatially isolated objects. The results demonstrate the validity and the accuracy of the proposed flexible fringe projection vision system on spatially continuous and discontinuous objects for 3D measurement.

  7. Code of practice and design principles for installed radiological protection systems

    International Nuclear Information System (INIS)

    Powell, R.G.

    1979-03-01

    For some years there has been comprehensive guidance documentation for Nuclear Reactor Instrumentation, but apparently no corresponding guide for designers and installers of Radiological Protection Instrumentation. A small group of instrumentation engineers discussed this lack of a suitable guide, and they examined the main points on which it should be based. This document attempts to present a comprehensive and detailed review of these points. It is intended to give an overall coverage and serve as a reference document for specific points; it should also be of value to the newcomer to the Radiological Protection Instrumentation field. This Code of Practice represents a standard of good practice and takes the form of recommendations only. Each installation must be assessed individually, and agreement on its suitability must be reached locally by the designers and the officers responsible for safety and operation. (author)

  8. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  9. Installing Git under MacOS

    OpenAIRE

    Fitzpatrick, Benjamin

    2015-01-01

    Step by step guide to installing the version control software Git under the Macintosh Operating System MacOS X (and later). Includes a seqeunce of screenshots with hand drawn arrows ;-) These slides are part of the materials for an Introductory course on the R language and environment for statistial computing. Free and Open Source materials for this course hosted on GitHub: https://github.com/brfitzpatrick/Intro_to_R

  10. Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade

    CERN Document Server

    AUTHOR|(CDS)2071552; Aggleton, Robin Cameron; Baber, Mark David John; Barbieri, Richard Alexander; Belknap, Donald Austin; Berryhill, Jeffrey; Brooke, James John; Bundock, Aaron; Cali, Ivan Amos; Cepeda, Maria Luisa; Dasgupta, Sudeshna; da Silva, J.C; Dasu, Sridhara Rao; Durkin, Timothy John; Fobes, Robert William; Ghabrous Larrea, Carlos; Gorski, Thomas; Grimes, Mark; Guilbaud, Maxime; Guo, Z; Hall, Geoffrey; Harder, Kristian; Harper, Sam; Iles, Gregory Michiel; Innocenti, Gian Michele; Ives, Sarah Joanne; Jones, John; Kreis, Benjamin Jonah; Lee, Y; Li, W; Lucas, Christopher; Lucas, Robyn Elizabeth; Marrouche, Jad; Newbold, David; Northup, Michael; Oljavo, I; Paramesvaran, Sudarshan; Rivera, Ryan Allen; Roland, Christof; Rose, A; Sankey, D; Smith, Wesley; Svetek, Ales; Tapper, Alexander; Thea, Alessandro; Tikalsky, Jesra Lilah; Uplegger, Lorenzo; Vicente, Marcelo; Williams, Thomas Stephen; Wyslouch, Boleslaw

    2016-01-01

    The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of th...

  11. Composite rotor blades for large wind energy installations

    Science.gov (United States)

    Kussmann, A.; Molly, J.; Muser, D.

    1980-01-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  12. Composite rotor blades for large wind energy installations

    Energy Technology Data Exchange (ETDEWEB)

    Kussmann, A; Molly, J P; Muser, D

    1979-06-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  13. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  14. Evaluation of Factors that Influence Residential Solar Panel Installations

    Energy Technology Data Exchange (ETDEWEB)

    Morton, April M. [ORNL; Omitaomu, Olufemi A. [ORNL; Kotikot, Susan M. [ORNL; Held, Elizabeth L. [ORNL; Bhaduri, Budhendra L. [ORNL

    2018-03-01

    Though rooftop photovoltaic (PV) systems are the fastest growing source of distributed generation, detailed information about where they are located and who their owners are is often known only to installers and utility companies. This lack of detailed information is a barrier to policy and financial assessment of solar energy generation and use. To bridge the described data gap, Oak Ridge National Laboratory (ORNL) was sponsored by the Department of Energy (DOE) Office of Energy Policy and Systems Analysis (EPSA) to create an automated approach for detecting and characterizing buildings with installed solar panels using high-resolution overhead imagery. Additionally, ORNL was tasked with using machine learning techniques to classify parcels on which solar panels were automatically detected in the Washington, DC, and Boston areas as commercial or residential, and then providing a list of recommended variables and modeling techniques that could be combined with these results to identify attributes that motivate the installation of residential solar panels. This technical report describes the methodology, results, and recommendations in greater detail, including lessons learned and future work.

  15. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  16. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  17. Development of an accurate transmission line fault locator using the global positioning system satellites

    Science.gov (United States)

    Lee, Harry

    1994-01-01

    A highly accurate transmission line fault locator based on the traveling-wave principle was developed and successfully operated within B.C. Hydro. A transmission line fault produces a fast-risetime traveling wave at the fault point which propagates along the transmission line. This fault locator system consists of traveling wave detectors located at key substations which detect and time tag the leading edge of the fault-generated traveling wave as if passes through. A master station gathers the time-tagged information from the remote detectors and determines the location of the fault. Precise time is a key element to the success of this system. This fault locator system derives its timing from the Global Positioning System (GPS) satellites. System tests confirmed the accuracy of locating faults to within the design objective of +/-300 meters.

  18. The installations of the Amsterdam town hall annex music theatre. Het stadhuis/muziektheater te Amsterdam, zitten daar ookinstallaties in

    Energy Technology Data Exchange (ETDEWEB)

    Huijben, J.W.

    1989-10-01

    The following systems within the title building are discussed:installations to produce heat or cold energy; air treatment andventilation systems; high-voltage installations and energy conservationmeasures; low-voltage installations; transport systems and stageinstallations. In particular mechanical engineering, the electricalinstallations and the energy conservation measures are highlighted. 13figs.

  19. Installing and Setting Up Git Software Tool on Windows | High-Performance

    Science.gov (United States)

    Computing | NREL Git Software Tool on Windows Installing and Setting Up Git Software Tool on Windows Learn how to set up the Git software tool on Windows for use with the Peregrine system. Git is this doc, we'll show you how to get git installed on Windows 7, and how to get things set up on NREL's

  20. Hydrological information system based on on-line monitoring--from strategy to implementation in the Brantas River Basin, East Java, Indonesia.

    Science.gov (United States)

    Marini, G W; Wellguni, H

    2003-01-01

    The worsening environmental situation of the Brantas River, East Java, is addressed by a comprehensive basin management strategy which relies on accurate water quantity and quality data retrieved from a newly installed online monitoring network. Integrated into a Hydrological Information System, the continuously measured indicative parameters allow early warning, control and polluter identification. Additionally, long-term analyses have been initiated for improving modelling applications like flood forecasting, water resource management and pollutant propagation. Preliminary results illustrate the efficiency of the installed system.

  1. Installation of the liquid nitrogen tank for the external cryogenics system

    CERN Multimedia

    2001-01-01

    The picture shows the installation of the 50000l liquid nitrogen tank in its first position next to the SHL annex of the SX5 building. The tank will be moved to its final position after the completion of the surface tests.

  2. 46 CFR 76.33-20 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... chart or diagram shall be installed adjacent to the detecting cabinet and auxiliary panel indicating the... system. The chart at the cabinet location or a separate card or booklet to be kept near the chart, shall...

  3. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    International Nuclear Information System (INIS)

    Nielsen, T K; Kjeldsen, M

    2010-01-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  4. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    Science.gov (United States)

    Nielsen, T. K.; Kjeldsen, M.

    2010-08-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  5. Solar heating and hot water system installed at Southeast of Saline, Unified School District 306, Mentor, Kansas

    Science.gov (United States)

    1979-01-01

    The solar system, installed in a new building, was designed to provide 52 percent of the estimated annual space heating load and 84 percent of the estimated annual potable hot water requirement. The liquid flat plate collectors are ground-mounted and cover a total area of 5125 square feet. The system will provide supplemental heat for the school's closed-loop water-to-air heat pump system and domestic hot water. The storage medium is water inside steel tanks with a capacity of 11,828 gallons for space heating and 1,600 gallons for domestic hot water. The solar heating facility is described and drawings are presented of the completed system which was declared operational in September 1978, and has functioned successfully since.

  6. Calculation of a vacuum system of the installation for cleaning the surface of metal rolling by a cathode spot of a vacuum arc

    Science.gov (United States)

    Kuznetsov, V. G.; Kurbanov, T. A.; Kostrin, D. K.

    2017-07-01

    In this work are presented the installations for cleaning the surface of rolled products (wire and ribbon) from scale and technological lubricant with gateway systems of open type. The calculation of gateway devices and the optimal selection of pumping systems are shown.

  7. Installation And Test Of Electron Beam Generation System To Produce Far-Infrared Radiation And X-Ray Pulses

    International Nuclear Information System (INIS)

    Wichaisirimongkol, Pathom; Jinamoon, Witoon; Khangrang, Nopadon; Kusoljariyakul, Keerati; Rhodes, Michael W.; Rimjaem, Sakhorn; Saisut, Jatuporn; Chitrlada, Thongbai; Vilaithong, Thiraphat; Wiedemann, Helmut

    2005-10-01

    SURIYA project at the Fast Neutron Research Facility, Chiang Mai University, aims to establish a facility to generate femtosecond electron beams. This electron beam can be used to generate high intensity far-infrared radiation and ultra-short X-ray pulses. The main components of the system are a 3 MeV RF electron gun with a thermionic cathode, an a-magnet as a bunch compressor, and post acceleration 15-20 MeV by a linear accelerator (linac). Between the main components, there are focusing quadrupole magnets and steering magnets to maintain the electron beam within a high vacuum tube. At the end of the beam transport line, a dipole magnet has been installed to function as a beam dump and an energy spectrometer. After the installation and testing of individual major components were completed, we have been investigating the generation of the electron beam, intense far- infrared radiation and ultra short X-ray pulses

  8. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  9. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant

  10. Data acquisition and control system in a heavy water detritiation installation

    International Nuclear Information System (INIS)

    Stefan, Iuliana; Balteanu, Ovidiu; Retevoi, Carmen; Stefan, Liviu

    2002-01-01

    The experimental installation for extracting tritium and deuterium from the tritiated heavy water used as moderator in CANDU type nuclear reactors is described. The separated tritium of high purity can be used in the fusion reactors of the future or in various laboratory researches. The fluids implied in operating this installation require special safety measures to be taken to protect both the operational personnel and the environment. Accordingly, in the technologic room no personnel is allowed and hence parameter monitoring, analyses and the testing must be done by remote control equipment. The computers for monitoring, warning and testing, as well as the sensors are housed in the data acquisition room, separated from the control room. The values generated by the process variables are converted in electrical or pneumatic signals and subsequently transmitted to the subsystems of monitoring, control and protection. Data acquisition in the control room is ensured by a computer provided with a FieldPoint interface. So, the connection between I/O modules from the data acquisition room and the computer ensures a 115.2 kb/s speed. Measured values of the parameters are recorded and displayed in the control room. Here these are compared with preset limits of the process parameters and in case of abnormal behavior, an alarm is triggered both optically and acoustically. At the same time, the program which controls the inputs and the outputs makes decisions and issues corrective or preventive commands for the technological process or installation protection, respectively. A diagram illustrating the monitoring, using a LabView platform is presented

  11. EMISSION AND TRENDS IN RECLAIMING WASTE HEAT IN INDUSTRIAL INSTALATIONS

    Directory of Open Access Journals (Sweden)

    Lech Hys

    2013-04-01

    Full Text Available The article presents the analysis of waste heat emission in a typical industrial installation. On the basis of the process monitoring system, periodic analyses of fumes composition, installation process manual and the conducted measurements of the heat fluxes from individual sources emitting heat on the way of natural convection from the devices’ coats and forced convection in the fumes flux were calculated. According to the authors the heat of temperature 140–155 °C and surface power density 860–970 W/m2 emitted by devices’ covers can be reclaimed in ORC techniques, Peltier’s modules and the systems realising Stirling cycle. Part of the waste heat included in fumes, which makes c.a. 76% of the total emission from the installation, should be returned to the process of fuel oxidation, what will reduce the emission by c.a. 18% and the volume of consumed fuel by c.a. 25 m3 CH4/h, according to the presented calculations.

  12. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  13. Installation method for the steel container and vessel of the nuclear heating reactor

    International Nuclear Information System (INIS)

    Chen Liying; Guo Jilin; Liu Wei

    2000-01-01

    The Nuclear Heating Reactor (NHR) has the advantages of inherent safety and better economics, integrated arrangement, full power natural circulation and dual vessel structure. However, the large thin container presents a new and difficult problem. The characteristics of the dual vessel installation method are analyzed with system engineering theory. Since there is no foreign or domestic experience, a new method was developed for the dual vessel installation for the 5 MW NHR. The result shows that the installation method is safe and reliable. The research on the dual vessel installation method has important significance for the design, manufacture and installation of the NHR dual vessel, as well as the industrialization and standardization of the NHR

  14. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  15. Automated eddy-current installation AVD-01 for detecting flaws in fuel element cans

    International Nuclear Information System (INIS)

    Varvaritsa, V.P.; Martishchenko, L.G.; Popov, V.K.; Romanov, M.L.; Shlepnev, I.O.; Shmatok, V.P.

    1986-01-01

    This paper describes an automated installation for eddy-current flaw detection in thin-walled pipes with small diameter; its unified transport system makes it possible to use the installation in inspection lines and production lines of fuel elements. The article describes the structural diagrams of the installation and presents the results of investigations connected with the selection for establishing the optimum regimes and sensitivity of feedthrough transducers with focusing screens

  16. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-16

    This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.

  17. Treasure Transformers: Novel Interpretative Installations for the National Palace Museum

    Science.gov (United States)

    Hsieh, Chun-Ko; Liu, I.-Ling; Lin, Quo-Ping; Chan, Li-Wen; Hsiao, Chuan-Heng; Hung, Yi-Ping

    Museums have missions to increase accessibility and share cultural assets to the public. The National Palace Museum intends to be a pioneer of utilizing novel interpretative installations to reach more diverse and potential audiences, and Human-Computer Interaction (HCI) technology has been selected as the new interpretative approach. The pilot project in partnership with the National Taiwan University has successfully completed four interactive installations. To consider the different nature of collections, the four systems designed against different interpretation strategies are uPoster, i-m-Top, Magic Crystal Ball and Virtual Panel. To assess the feasibility of the project, the interactive installations were exhibited at the Taipei World Trade Center in 2008. The purpose of this paper is to present the development of the "Treasure Transformers" exhibition, design principles, and effectiveness of installations from the evaluation. It is our ambition that the contributions will propose innovative media approaches in museum settings.

  18. Approach and organisation of radiation sources safety and security of installations

    International Nuclear Information System (INIS)

    Al-Hilali, S.

    1998-01-01

    Development of application of techniques using radiation sources was fact in all public domains. Although all these techniques were meant for so called peaceful uses they should respect safety regulations in order to ensure safety of personnel, public and the environment. Security system for installations adopted by CNESTEN is based on establishing administrative and technical protection of the installation against external or internal aggression on one hand and protection of the environment by confining radioactivity, on the other hand. Application of Methode Organisee et Systematique d'analyse de risque (MOSAR) at the installations of CNESTEN showed weak points in order to define barriers for prevention and means necessary for management and dealing with accidental situations. At the first stage this attitude was limited to qualitative considerations adopting macroscopic analysis of each installation. Experience obtained from operation of these installation, which have started operation hardly a few months ago, would establish a real database indispensable for complete risk analysis including quantification of possible risks

  19. Leveraging Two Kinect Sensors for Accurate Full-Body Motion Capture

    Directory of Open Access Journals (Sweden)

    Zhiquan Gao

    2015-09-01

    Full Text Available Accurate motion capture plays an important role in sports analysis, the medical field and virtual reality. Current methods for motion capture often suffer from occlusions, which limits the accuracy of their pose estimation. In this paper, we propose a complete system to measure the pose parameters of the human body accurately. Different from previous monocular depth camera systems, we leverage two Kinect sensors to acquire more information about human movements, which ensures that we can still get an accurate estimation even when significant occlusion occurs. Because human motion is temporally constant, we adopt a learning analysis to mine the temporal information across the posture variations. Using this information, we estimate human pose parameters accurately, regardless of rapid movement. Our experimental results show that our system can perform an accurate pose estimation of the human body with the constraint of information from the temporal domain.

  20. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  1. Diagnosis of the operation state of photovoltaic water pumping systems installed in Pernambuco state, Brazil; Diagnostico do estado de funcionamento de sistemas de bombeamento de agua fotovoltaico (SBFV) instalados em Pernambuco

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Heitor Scalambrini [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil). Nucleo de Apoio a Projetos de Energias Renovaveis], Email: hscosta@ufpe.br

    2006-07-01

    The major projects concerning the dissemination of the use of photovoltaic solar energy (PVSE) in Brazil are located in the Northeast region. Particularly, the state of Pernambuco has the largest number of installations and the largest installed power of autonomous systems. There exist approximately 700 residencies, 250 schools and 150 water pumping systems among other applications using PVSE, totaling 250 k Wp installed in more than 80 cities of that State. This work analyses a diagnosis report on the state of functioning of 64 one-year-old water-pumping installations in 30 m to 60 m depth wells, driven by 300 to 1,600 Wp photovoltaic generators, the flows varying from 200 l/h to 6,000 l/h. Technical and non-technical problems were identified, ranging from improper location choice, wrong system dimensioning, inadequate photovoltaic generator installations, lack of user instruction and training, lack of responsibility definitions regarding the technical assistance and the needed follow-up. In the final part of this report proposals are enumerated concerning the establishment of a local and municipal organizing structure aiming the management of the water-pumping installations and the assurance of a larger success probability in the use of that technology. (author)

  2. Favourable environmental factors for shaft furnace installation for gas carbonitriding and hardening

    Energy Technology Data Exchange (ETDEWEB)

    Fuchs, H. (Solo-Industrieofenbau, Biehl-Bienne (Switzerland))

    In this lecture we do not primarily speak about the shaft furnace installation as one could think when reading the title - but about one quenching system - mounted over the shaft furnace installation. This quenching system permits a hardening in several mediums, without any formation of flames, smoke and vapour, and causes the surfaces of the pieces to be free of tinder. Moreover, the security for the work staff in the heat treatment shops are highly improved.

  3. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  4. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  5. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: actual-pressure/actual-size combustor test equipment (structural drawing of exhaust temperature reducing device, structural drawing of hot air device, system diagram of piping, etc.), safety environmental equipment (total system diagram, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, front view of auxiliary panel of safety environment equipment, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of gas circuit breaker, etc.), common facilities (total layout, diagram of the nitrogen gas pipe system, system diagram of utility equipment, etc.) In pictures of fabrication/installation, pictures of the following were included: state of the construction work, gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, 66kV/6.9kV indoor switching station facilities, common facilities. (NEDO)

  6. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  7. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  8. Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, Kristen; O' Shaughnessy, Eric; Fu, Ran; McClurg, Chris; Huneycutt, Joshua; Margolis, Robert

    2016-12-01

    In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quarter of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.

  9. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  10. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  11. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations

    International Nuclear Information System (INIS)

    Lacour, J.

    1964-01-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [fr

  12. Improved image quality in pinhole SPECT by accurate modeling of the point spread function in low magnification systems

    International Nuclear Information System (INIS)

    Pino, Francisco; Roé, Nuria; Aguiar, Pablo; Falcon, Carles; Ros, Domènec; Pavía, Javier

    2015-01-01

    Purpose: Single photon emission computed tomography (SPECT) has become an important noninvasive imaging technique in small-animal research. Due to the high resolution required in small-animal SPECT systems, the spatially variant system response needs to be included in the reconstruction algorithm. Accurate modeling of the system response should result in a major improvement in the quality of reconstructed images. The aim of this study was to quantitatively assess the impact that an accurate modeling of spatially variant collimator/detector response has on image-quality parameters, using a low magnification SPECT system equipped with a pinhole collimator and a small gamma camera. Methods: Three methods were used to model the point spread function (PSF). For the first, only the geometrical pinhole aperture was included in the PSF. For the second, the septal penetration through the pinhole collimator was added. In the third method, the measured intrinsic detector response was incorporated. Tomographic spatial resolution was evaluated and contrast, recovery coefficients, contrast-to-noise ratio, and noise were quantified using a custom-built NEMA NU 4–2008 image-quality phantom. Results: A high correlation was found between the experimental data corresponding to intrinsic detector response and the fitted values obtained by means of an asymmetric Gaussian distribution. For all PSF models, resolution improved as the distance from the point source to the center of the field of view increased and when the acquisition radius diminished. An improvement of resolution was observed after a minimum of five iterations when the PSF modeling included more corrections. Contrast, recovery coefficients, and contrast-to-noise ratio were better for the same level of noise in the image when more accurate models were included. Ring-type artifacts were observed when the number of iterations exceeded 12. Conclusions: Accurate modeling of the PSF improves resolution, contrast, and recovery

  13. Improved image quality in pinhole SPECT by accurate modeling of the point spread function in low magnification systems

    Energy Technology Data Exchange (ETDEWEB)

    Pino, Francisco [Unitat de Biofísica, Facultat de Medicina, Universitat de Barcelona, Barcelona 08036, Spain and Servei de Física Mèdica i Protecció Radiològica, Institut Català d’Oncologia, L’Hospitalet de Llobregat 08907 (Spain); Roé, Nuria [Unitat de Biofísica, Facultat de Medicina, Universitat de Barcelona, Barcelona 08036 (Spain); Aguiar, Pablo, E-mail: pablo.aguiar.fernandez@sergas.es [Fundación Ramón Domínguez, Complexo Hospitalario Universitario de Santiago de Compostela 15706, Spain and Grupo de Imagen Molecular, Instituto de Investigacións Sanitarias de Santiago de Compostela (IDIS), Galicia 15782 (Spain); Falcon, Carles; Ros, Domènec [Institut d’Investigacions Biomèdiques August Pi i Sunyer (IDIBAPS), Barcelona 08036, Spain and CIBER en Bioingeniería, Biomateriales y Nanomedicina (CIBER-BBN), Barcelona 08036 (Spain); Pavía, Javier [Institut d’Investigacions Biomèdiques August Pi i Sunyer (IDIBAPS), Barcelona 080836 (Spain); CIBER en Bioingeniería, Biomateriales y Nanomedicina (CIBER-BBN), Barcelona 08036 (Spain); and Servei de Medicina Nuclear, Hospital Clínic, Barcelona 08036 (Spain)

    2015-02-15

    Purpose: Single photon emission computed tomography (SPECT) has become an important noninvasive imaging technique in small-animal research. Due to the high resolution required in small-animal SPECT systems, the spatially variant system response needs to be included in the reconstruction algorithm. Accurate modeling of the system response should result in a major improvement in the quality of reconstructed images. The aim of this study was to quantitatively assess the impact that an accurate modeling of spatially variant collimator/detector response has on image-quality parameters, using a low magnification SPECT system equipped with a pinhole collimator and a small gamma camera. Methods: Three methods were used to model the point spread function (PSF). For the first, only the geometrical pinhole aperture was included in the PSF. For the second, the septal penetration through the pinhole collimator was added. In the third method, the measured intrinsic detector response was incorporated. Tomographic spatial resolution was evaluated and contrast, recovery coefficients, contrast-to-noise ratio, and noise were quantified using a custom-built NEMA NU 4–2008 image-quality phantom. Results: A high correlation was found between the experimental data corresponding to intrinsic detector response and the fitted values obtained by means of an asymmetric Gaussian distribution. For all PSF models, resolution improved as the distance from the point source to the center of the field of view increased and when the acquisition radius diminished. An improvement of resolution was observed after a minimum of five iterations when the PSF modeling included more corrections. Contrast, recovery coefficients, and contrast-to-noise ratio were better for the same level of noise in the image when more accurate models were included. Ring-type artifacts were observed when the number of iterations exceeded 12. Conclusions: Accurate modeling of the PSF improves resolution, contrast, and recovery

  14. Development and Testing of a Friction-Based Post-Installable Fiber-Optic Monitoring System for Subsea Applications

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating

  15. Physical Protection Study of the Radio metallurgy Installation Using SAVIComputer Program

    International Nuclear Information System (INIS)

    Pinitoyo, Andreas

    2000-01-01

    Based on IAEA Recommendation on INFCIR/225/Rev.3 (The Physical Protectionof Nuclear Material), a nuclear installation shall have physical protectionsystem for protection or being secure on sabotage activities in theinstallation and thieve of nuclear materials. The recommendation states therequirements for physical protection of nuclear materials usage, transit andstorage. Radio metallurgy Installation of the Fuel Element and ReprocessingDevelopment Center (BATAN) at Serpong is a nuclear installation for researchon post irradiation of high radioactive spent fuel element, its processingand storage. The installation has risk on threat of a sabotage, which isdominant than thieve. The RMI building was designed and constructed ofphysical protection components and have been integrated with the BATAN Safetyand Security System and the Security Guards functions to be PhysicalProtection System for the RMI. By using the SAVI Computer Program with inputdata from the existing standards, assumptions for detection possibility,delay and response, that will result the probability of interruptions of theworst adversary paths PI = 0.1. These mean that the physical protectionsystems of the RMI shall be upgraded and improved in order to be reliable orbetter if the most of paths to the target PI = 1.0. (author)

  16. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  17. Electrical installations of the Channel tunnel; Installations electriques du Tunnel sous la Manche

    Energy Technology Data Exchange (ETDEWEB)

    Kersabiec, G. de [Eurotunnel, Folkestone (United Kingdom)

    2002-08-01

    Like an underground factory, the railway and auxiliary equipments of the Channel tunnel between France and UK, need a reliable and redundant power supply with a high quality maintenance. This article presents: the design criteria of the power distribution systems, the installation itself and the organisation of its exploitation: 1 - transportation system of the Channel tunnel (loads to supply, exploitation imperatives, fundamental criteria); 2 - external power sources (connection to the UK and French grids, values used by the national grids); 3 - exploitation criteria, tunnel design; 4 - description (main UK and French power stations, 25 kV traction network, 21 kV distribution network, tunnels, lighting in railway tunnels, supply of terminals, earthing network); 5 - exploitation; 6 - maintenance and quality. (J.S.)

  18. Mid-market transformation programs: programs to promote best practices in system specification and installation

    International Nuclear Information System (INIS)

    Rosenberg, Mitchell

    2003-01-01

    This paper summarizes the experience of programs designed to promote the adoption of best practices in equipment specification and installation among distributors and installation contractors in the residential central air conditioning and industrial compressed air equipment markets. For each of those markets, the paper identifies the current understanding of best practices, characterizes energy savings available from their adoption, assesses the nature of barriers to their adoption, and describes the operations and accomplishments of programs designed to address those barriers

  19. Installation of a variable-angle spectrometer system for monitoring diffuse and global solar radiation

    Science.gov (United States)

    Ormachea, O.; Abrahamse, A.; Tolavi, N.; Romero, F.; Urquidi, O.; Pearce, J. M.; Andrews, R.

    2013-11-01

    We report on the design and installation of a spectrometer system for monitoring solar radiation in Cochabamba, Bolivia. Both the light intensity and the spectral distribution affect the power produced by a photovoltaic device. Local variations in the solar spectrum (especially compared to the AM1.5 standard) may have important implications for device optimization and energy yield estimation. The spectrometer system, based on an Ocean Optics USB4000 (300-900nm) spectrometer, was designed to increase functionality. Typically systems only record the global horizontal radiation. Our system moves a fiber-optic cable 0-90 degrees and takes measurements in 9 degree increments. Additionally, a shadow band allows measurement of the diffuse component of the radiation at each position. The electronic controls utilize an Arduino UNO microcontroller to synchronizes the movement of two PAP bipolar (stepper) motors with the activation of the spectrometer via an external trigger. The spectrometer was factory calibrated for wavelength and calibrated for absolute irradiance using a Sellarnet SL1-Cal light source. We present preliminary results from data taken March-June, 2013, and comment on implications for PV devices in Cochabamba.

  20. Characterization of double face adhesive sheets for ceramic tile installation

    International Nuclear Information System (INIS)

    Nascimento, Otavio L.; Mansur, Alexandra A.P.; Mansur, Herman S.

    2011-01-01

    The main goal of this work was the characterization of an innovative ceramic tile installation product based on double face adhesive sheets. Density, hardness, tensile strength, x-ray diffraction, infrared spectroscopy, and scanning electron microscopy coupled with spectroscopy of dispersive energy assays were conducted. The results are in agreement with some manufacture specifications and the obtained information will be crucial in the analysis of durability and stability of the ceramic tile system installed with this new product. (author)

  1. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  2. A new fire alarm system for electrical installations

    CERN Document Server

    Pietersen, A H

    1978-01-01

    Fires in electrical installations are considered to develop in four phases - initiation, smouldering, flame formation and heat development. Cables are among the more sensitive components, with working temperatures around 50 degrees C and fire detection at 70 degrees C. Conventional alarms include smoke detectors. The new technique described uses microcapsules containing powder forming a gas of the Freon type after diffusion. A typical microcapsule loses 4% per year and has a natural life of 10 years. Fabrication methods are described. Detection is by gas concentration, with a sensitivity of 1 to 10 ppm, or by acoustic methods with microphones to pick up the sound of fractures. Pressure/temperature characteristics of various types of Freon mixtures commercially available are given in graphical form.

  3. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L; Wiser, Ryan; Peterman, Carla; Darghouth, Naim

    2009-10-05

    Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of

  4. THE NATURAL COLD ACCUMULATOR AND VACUUM INSTALLATION FOR MILK COOLING IN REPUBLIC OF MOLDOVA

    Directory of Open Access Journals (Sweden)

    Cretu V.

    2010-04-01

    Full Text Available Based on theoretical and experimental research of the milk cooling process was elaborated mathematical model of accumulator with natural cold and vacuum installations, which allows determining the operating system installations, mentioned from environmental parameters.

  5. Smart home in a box: usability study for a large scale self-installation of smart home technologies.

    Science.gov (United States)

    Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen

    2016-07-01

    This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.

  6. 46 CFR 76.17-90 - Installations contracted for prior to November 19, 1952.

    Science.gov (United States)

    2010-10-01

    ... they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2) The... VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-90 Installations contracted...

  7. 46 CFR 76.30-90 - Installations contracted for prior to November 19, 1952.

    Science.gov (United States)

    2010-10-01

    ... and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2... VESSELS FIRE PROTECTION EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-90 Installations...

  8. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Science.gov (United States)

    2010-10-01

    ..., and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and replacements may be made to the same standards as the original installation. (b... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...

  9. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Science.gov (United States)

    2010-10-01

    ... and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and replacements may be made to the same standards as the original installation. (2... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...

  10. 46 CFR 95.17-90 - Installations contracted for prior to November 19, 1952.

    Science.gov (United States)

    2010-10-01

    ... and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2... MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-90 Installations...

  11. 46 CFR 76.27-90 - Installations contracted for prior to November 19, 1952.

    Science.gov (United States)

    2010-10-01

    ..., and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2... VESSELS FIRE PROTECTION EQUIPMENT Electric Fire Detecting System, Details § 76.27-90 Installations...

  12. Computational model for real-time determination of tritium inventory in a detritiation installation

    International Nuclear Information System (INIS)

    Bornea, Anisia; Stefanescu, Ioan; Zamfirache, Marius; Stefan, Iuliana; Sofalca, Nicolae; Bidica, Nicolae

    2008-01-01

    Full text: At ICIT Rm.Valcea an experimental pilot plant was built having as main objective the development of a technology for detritiation of heavy water processed in the CANDU-type reactors of the nuclear power plant at Cernavoda, Romania. The aspects related to safeguards and safety for such a detritiation installation being of great importance, a complex computational model has been developed. The model allows real-time calculation of tritium inventory in a working installation. The applied detritiation technology is catalyzed isotopic exchange coupled with cryogenic distillation. Computational models for non-steady working conditions have been developed for each process of isotopic exchange. By coupling these processes tritium inventory can be determined in real-time. The computational model was developed based on the experience gained on the pilot installation. The model uses a set of parameters specific to isotopic exchange processes. These parameters were experimentally determined in the pilot installation. The model is included in the monitoring system and uses as input data the parameters acquired in real-time from automation system of the pilot installation. A friendly interface has been created to visualize the final results as data or graphs. (authors)

  13. Low-voltage electrical installations in medical buildings - clinical centres and hospitals

    Directory of Open Access Journals (Sweden)

    Simić Ninoslav

    2015-01-01

    Full Text Available This paper presents the observations collected during the testing of electrical installations in medical buildings. The details of the power supply, wiring systems and the implemented systems of protection against electric shocks are described. The causes of some faults during the exploitation of the facilities are presented through practical examples, and the specific problem caused by water leaking through the insulation of electrical installations is explained in detail. It is pointed out how important maintenance, monitoring and application of the latest standards in this area are, as well as adequate training of professional staff.

  14. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  15. Accurate Lithium-ion battery parameter estimation with continuous-time system identification methods

    International Nuclear Information System (INIS)

    Xia, Bing; Zhao, Xin; Callafon, Raymond de; Garnier, Hugues; Nguyen, Truong; Mi, Chris

    2016-01-01

    Highlights: • Continuous-time system identification is applied in Lithium-ion battery modeling. • Continuous-time and discrete-time identification methods are compared in detail. • The instrumental variable method is employed to further improve the estimation. • Simulations and experiments validate the advantages of continuous-time methods. - Abstract: The modeling of Lithium-ion batteries usually utilizes discrete-time system identification methods to estimate parameters of discrete models. However, in real applications, there is a fundamental limitation of the discrete-time methods in dealing with sensitivity when the system is stiff and the storage resolutions are limited. To overcome this problem, this paper adopts direct continuous-time system identification methods to estimate the parameters of equivalent circuit models for Lithium-ion batteries. Compared with discrete-time system identification methods, the continuous-time system identification methods provide more accurate estimates to both fast and slow dynamics in battery systems and are less sensitive to disturbances. A case of a 2"n"d-order equivalent circuit model is studied which shows that the continuous-time estimates are more robust to high sampling rates, measurement noises and rounding errors. In addition, the estimation by the conventional continuous-time least squares method is further improved in the case of noisy output measurement by introducing the instrumental variable method. Simulation and experiment results validate the analysis and demonstrate the advantages of the continuous-time system identification methods in battery applications.

  16. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  17. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  18. Experience of Developing Cloud Service for accounting Sales in installments

    Science.gov (United States)

    Barankov, V. V.; Barankova, I. I.; Mikhailova, U. V.; Kalugina, O. B.

    2018-05-01

    The paper presents the developed and implemented system of accounting sales in installments using tables as a cloud variant of Google services. The main system requirements and the special features of the program implementation such as the multi user data cleaning, the volume and speed of converting the tables, the mechanisms of conditional formatting of cells, the protection of cells and ranges and the data input check are provided. The paper also discusses the functionality of the system of accounting sales in installments, which is implemented by the formulae in the cells, the formulae in the extra options of Google tables and by programming in Google Apps Script, as a cloud variant of Java Script. The safety and security of the customers’ data, as well as staff members’ accountability and responsibility for the input of data in the system, are provided by a number of information security measures

  19. 33 CFR 183.550 - Fuel tanks: Installation.

    Science.gov (United States)

    2010-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Manufacturer Requirements § 183.550 Fuel tanks: Installation. (a) Each fuel tank must not be integral with any boat structure or mounted on an engine. (b) Each... the top surface of each metallic fuel tank when the boat is in its static floating position. (e) Each...

  20. Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-11-01

    As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed price of these systems over time and by location, customer type, and system characteristics. This report helps to fill this need by summarizing trends in the installed price of grid-connected PV systems in the United States from 1998 through 2011, with preliminary data for 2012. The analysis is based on project-level data for more than 150,000 individual residential, commercial, and utility-scale PV systems, totaling more than 3,000 megawatts (MW) and representing 76% of all grid-connected PV capacity installed in the United States through 2011. The report describes installed price trends for residential and commercial PV systems, and another set of trends for utility-scale PV. In all cases, installed prices are identified in terms of real 2011 dollars per installed watt (DC-STC), prior to receipt of any direct financial incentives or tax credits.