WorldWideScience

Sample records for acceptance test procedures

  1. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  2. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  3. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  4. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  5. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  6. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  7. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  8. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  9. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  10. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  11. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  12. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  13. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  14. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  15. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  18. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  19. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  20. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  2. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  3. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  4. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  10. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  11. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  12. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  13. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  15. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  16. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  17. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  18. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  19. Void fraction instrument acceptance test procedure

    International Nuclear Information System (INIS)

    Stokes, T.I.; Pearce, K.L.

    1994-01-01

    This document presents the results of the acceptance test for the mechanical and electrical features (not specifically addressed by the software ATP) of the void fraction instrument (VFI). Acceptance testing of the VFI, control console, and decontamination spray assembly was conducted in the 306E building high bay and area adjacent to the facility. The VFI was tested in the horizontal position supported in multiple locations on rolling tables. The control console was located next to the VFI pneumatic control assembly. The VFI system was operated exactly as is expected in the tank farm, with the following exceptions: power was provided from a building outlet and the VFI was horizontal. The testing described in this document verifies that the mechanical and electrical features are operating as designed and that the unit is ready for field service

  20. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  1. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  2. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  3. Cone penetrometer acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  4. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  5. Gas characterization system software acceptance test procedure

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  6. Cone penetrometer moisture probe acceptance test report

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1996-01-01

    This Acceptance Test Report (ATR) documents the results of WHC-SD-WM-ATP-146 (Prototype Cone Penetrometer Moisture Probe Acceptance Test Procedure) and WHC-SD-WM-ATP-145 (Cone Penetrometer Moisture Probe Acceptance Test Procedure). The master copy of WHC-SD-WM-ATP-145 can be found in Appendix A and the master copy of WHC-SD-WM-ATP-146 can be found in Appendix B. Also included with this report is a matrix showing design criteria of the cone penetrometer moisture probe and the verification method used (Appendix C)

  7. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  8. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  9. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  10. Acceptance test procedure for C-018H, 242-A evaporator/PUREX plant process condensate treatment facility

    International Nuclear Information System (INIS)

    Parrish, D.E.

    1994-01-01

    This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation system function as required for this facility. Each company or organization participating in this ATP will designate personnel to assume the responsibilities and duties as defined herein for their respective roles

  11. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  12. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  13. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly

  14. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  15. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  16. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  17. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  18. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  19. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  20. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  1. Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Larsen, D.C.

    1998-01-01

    Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was determined to be unrelated to the ATP and unfortunate that the instrument failed during the ATP. The next two test exceptions were disposition as acceptable because the alarming functions worked correctly in identifying a problem when software communications were interrupted. The test was completed satisfactorily over 2 days. The remainder of the acceptance test report is the completed test procedure

  2. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  3. Acceptance test report for core sample trucks 3 and 4

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-01-01

    The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ''Engineering Practice Guidelines,'' Appendix M, ''Acceptance Test Procedures and Reports.'' Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ''Rock Slinger'' test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted

  4. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  5. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    Science.gov (United States)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  6. Acceptance of Colonoscopy Requires more than Test Tolerance

    Directory of Open Access Journals (Sweden)

    Amanda Condon

    2008-01-01

    Full Text Available BACKGROUND: Colon cancer screening, including colonoscopy, lags behind other forms of cancer screening for participation rates. The intrinsic nature of the endoscopic procedure may be an important barrier that limits patients from finding this test acceptable and affects willingness to undergo screening. With colon cancer screening programs emerging in Canada, test characteristics and their impact on acceptance warrant consideration.

  7. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    International Nuclear Information System (INIS)

    Barrett, R.A.

    1995-01-01

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP's facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson's facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified

  8. Acceptance test report 2721-Z upgrades

    International Nuclear Information System (INIS)

    Keck, R.D.

    1998-01-01

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing

  9. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  10. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  11. Acceptance test procedure MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor

  12. Acceptance test report MICON software exhaust fan control

    International Nuclear Information System (INIS)

    Keck, R.D.

    1998-01-01

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped

  13. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  14. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  15. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  16. Specification and acceptance testing of radiotherapy treatment planning systems

    International Nuclear Information System (INIS)

    2007-04-01

    Quality assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. The computerized radiotherapy treatment planning systems (RTPSs) are now widely available in industrialized and developing countries and it is of special importance to support hospitals in Member States in developing procedures for acceptance testing, commissioning and QA of their RTPSs. Responding to these needs, a group of experts developed an IAEA publication with such recommendations, which was published in 2004 as IAEA Technical Reports Series No. 430. This report provides a general framework and describes a large number of tests and procedures that should be considered by the users of new RTPSs. However, small hospitals with limited resources or large hospitals with high patient load and limited staff are not always able to perform complete characterization, validation and software testing of algorithms used in RTPSs. Therefore, the IAEA proposed more specific guidelines that provide a step-by-step recommendation for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for newly purchased RTPSs. The current publication was developed in the framework of the Coordinated Research Project on Development of Procedures for Quality Assurance for Dosimetry Calculations in Radiotherapy and uses the International Electrotechnical Commission (IEC) standard IEC 62083, Requirements for the Safety of Radiotherapy Treatment Planning Systems as its basis. The report addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and users at the hospitals. Recommendations are provided for specific tests to be performed at the manufacturing facility known as type tests, and for acceptance tests to be performed at the hospital known as site tests. The purpose of acceptance testing is to demonstrate to the

  17. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  18. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  19. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  20. Acceptance Test Report for the 241-AN-107 Enraf Advanced Technology Gauges

    International Nuclear Information System (INIS)

    Dowell, J.L.; Enderlin, V.R.

    1995-06-01

    This Acceptance Test Report covers the results of the execution of the Acceptance Test Procedure for the 241-AN-107 Enraf Advanced Technology Gauges. The test verified the proper operation of the gauges to measure waste density and level in the 241-AN-107 tank

  1. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    International Nuclear Information System (INIS)

    ANDREWS, J.E.

    2000-01-01

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications

  2. Procedures and acceptance criteria for PAS-1 cask inspections

    International Nuclear Information System (INIS)

    Mercado, J.E.

    1998-01-01

    The procedures and acceptance criteria that comprise this document were prepared to support a one-time test to certify two PAS-1 casks in accordance with US Department of Energy Certificate of Compliance US A/9184/B(U), which was issued in 1998. The specific inspections addressed in this document are the visual weld inspection and a dimensional inspection of the primary containment vessel

  3. Acceptance procedures: Microfilm printer

    Science.gov (United States)

    Lockwood, H. E.

    1973-01-01

    Acceptance tests were made for a special order automatic additive color microfilm printer. Tests include film capacity, film transport, resolution, illumination uniformity, exposure range checks, and color cuing considerations.

  4. 242A Distributed Control System Year 2000 Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  5. 242A Distributed Control System Year 2000 Acceptance Test Report

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3(trademark) (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

  6. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  7. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  8. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    Energy Technology Data Exchange (ETDEWEB)

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  9. Acceptance test report for the AY-102 ENRAF densitometer

    International Nuclear Information System (INIS)

    Huber, J.H.

    1998-01-01

    On February 11, 1998, the AY-1 02, Riser 15E ENRAF Densitometer was acceptance tested per HNF-SD-WM-ATP-077. The test was performed at the Department of Energy's Hanford Site, 200 East Area, building MO-407. The test validated the functionality of the Densitometer for use by project W-320, C-1 06 Retrieval. The purpose of the test procedure was to verify the functionality of the ENRAF Series 854 ATG densitometer. Typically, all ENRAF Series 854 ATGs are acceptance tested before transport to the field. The ATP, as performed for level gauges, sets default program values within the gauge and verifies the gauge's force transducer calibration

  10. 105K West Isolation Barrier Acceptance Test results

    International Nuclear Information System (INIS)

    McCracken, K.J.; Irwin, J.J.

    1995-01-01

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test

  11. Acceptance test report: Field test of mixer pump for 241-AN-107 caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1997-01-01

    The field acceptance test of a 75 HP mixer pump (Hazleton serial number N-20801) installed in Tank 241-AN-107 was conducted from October 1995 thru February 1996. The objectives defined in the acceptance test were successfully met, with two exceptions recorded. The acceptance test encompassed field verification of mixer pump turntable rotation set-up and operation, verification that the pump instrumentation functions within established limits, facilitation of baseline data collection from the mixer pump mounted ultrasonic instrumentation, verification of mixer pump water flush system operation and validation of a procedure for its operation, and several brief test runs (bump) of the mixer pump

  12. Feasibility of the gamma camera acceptance testing procedure introduced by the Swiss Federal Office of public health

    International Nuclear Information System (INIS)

    Baechler, S.; Bochud, F.; Verdun, F.R.; Corminboeuf, F.; Linder, R.; Trueb, Ph.; Malterre, J.; Bischof Delaloye, A.

    2006-01-01

    Like in the field of radiology, digital systems are also becoming the standard in the field of nuclear medicine. This offers not only the possibility to process, transmit and archive data from patients more easily but also to introduce quantitative measurements for quality controls. In this framework, standards concerning the qualification of gamma camera systems have been updated and appeared to be useful to set legal requirements, in spite of the fact, that this is not their goals. The aim of this study was first to choose a set of tests described in standards to define measurements to be performed at the acceptance of the systems and after the regular maintenance (at least once every six months). Reference values are then established to control the stability of the system. To verify the feasibility, from a technical and a time requirements points of view, the tests proposed for the quality assurance programme have been applied on three gamma camera systems. The results of this study show that new requirements concerning the quality assurance of gamma camera of the Swiss Federal Office of Public Health based on international standards required to slightly modify some procedures to reduce the time necessary for the acceptance and status tests. (authors)

  13. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  14. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  15. Acceptance test report, plutonium finishing plant life safety upgrade

    International Nuclear Information System (INIS)

    Hodge, S.G.

    1994-01-01

    This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door By Pass Switches

  16. 32 CFR 1806.3 - Procedures governing acceptance of service of process.

    Science.gov (United States)

    2010-07-01

    ... COUNTERINTELLIGENCE CENTER PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1806.3 Procedures governing acceptance of service of process. (a) Service of Process Upon the NACIC or a NACIC Employee in an Official..., personal service of process may be accepted only by NACIC Counsel, Director, NACIC, or Deputy Director...

  17. Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1995-11-01

    This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel and purge control panel will be tested for its safety interlock which shuts down the camera and pan-and-tilt inside the tank vapor space during loss of purge pressure and that the correct purge volume exchanges are performed as required by NFPA 496. This procedure is separated into seven sections. This Acceptance/Operational Test Report documents the successful acceptance and operability testing of the 241-AN-104 camera system and camera purge control system

  18. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Science.gov (United States)

    2010-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing acceptance of service of process. (a) Service of Process Upon the CIA or a CIA Employee in An Official..., personal service of process may be accepted only by attorneys of the Office of General Counsel at CIA...

  19. WRAP low level waste (LLW) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1998-01-01

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report

  20. W-026, transuranic waste (TRU) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1998-01-01

    On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, sorting table, lidder/delidder device and the TRU empty drum compactor were also conducted. As of February 25, 1998, 10 of the 102 test exceptions that affect the TRU glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test exceptions are provided as appendices to this report

  1. WRAP low level waste (LLW) glovebox acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  2. Acceptance Testing of Thermoluminescent Dosimeter Holders.

    Science.gov (United States)

    Romanyukha, Alexander; Grypp, Matthew D; Sharp, Thad J; DiRito, John N; Nelson, Martin E; Mavrogianis, Stanley T; Torres, Jeancarlo; Benevides, Luis A

    2018-05-01

    The U.S. Navy uses the Harshaw 8840/8841 dosimetric (DT-702/PD) system, which employs LiF:Mg,Cu,P thermoluminescent dosimeters (TLDs), developed and produced by Thermo Fisher Scientific (TFS). The dosimeter consists of four LiF:Mg,Cu,P elements, mounted in Teflon® on an aluminum card and placed in a plastic holder. The holder contains a unique filter for each chip made of copper, acrylonitrile butadiene styrene (ABS), Mylar®, and tin. For accredited dosimetry labs, the ISO/IEC 17025:2005(E) requires an acceptance procedure for all new equipment. The Naval Dosimetry Center (NDC) has developed and tested a new non-destructive procedure, which enables the verification and the evaluation of embedded filters in the holders. Testing is based on attenuation measurements of low-energy radiation transmitted through each filter in a representative sample group of holders to verify that the correct filter type and thickness are present. The measured response ratios are then compared with the expected response ratios. In addition, each element's measured response is compared to the mean response of the group. The test was designed and tested to identify significant nonconformities, such as missing copper or tin filters, double copper or double tin filters, or other nonconformities that may impact TLD response ratios. During the implementation of the developed procedure, testing revealed a holder with a double copper filter. To complete the evaluation, the impact of the nonconformities on proficiency testing was examined. The evaluation revealed failures in proficiency testing categories III and IV when these dosimeters were irradiated to high-energy betas.

  3. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    International Nuclear Information System (INIS)

    Lott, D.T.

    1995-01-01

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP's performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12

  4. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  5. 242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility

  6. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  7. GMS/DACS interface acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring of existing, and newly installed, instrumentation associated with the SY-101 tank Gas Monitoring Systems will be systematically evaluated by performance of this procedure. All new alarms will be verified to function at the required setpoints. The change of I/O Drop 17 to I/O Drop 13 will be checked to verify that all associated alarms and screen displays are correct. All new or changed Control Screens which provide operator interface with the Gas Monitoring Systems readouts during operations will be verified to be adequate and correct. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B ampersand K (Photo) NH 3 equipment; any new or changed Genesis screens; and I/O Drop 13

  8. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  9. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Science.gov (United States)

    2010-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702.3 Procedures governing acceptance of service of process. (a) Service of process upon the ODNI or an... authorized by the General Counsel, personal service of process upon the ODNI or an ODNI employee in the...

  10. Acceptance Test Report for Fourth-Generation Hanford Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  11. 14 CFR 151.29 - Procedures: Offer, amendment, and acceptance.

    Science.gov (United States)

    2010-01-01

    ... resolution or ordinance must, as appropriate under the local law— (1) Set forth the terms of the offer at... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Procedures: Offer, amendment, and... § 151.29 Procedures: Offer, amendment, and acceptance. (a) Upon approving a project, the Administrator...

  12. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ''1/0 MODULE HEALTH STATUS'', ''MININ1'', and ''MININ2'' screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure

  13. Nevada test site defense waste acceptance criteria, certification, and transfer requirements

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Test Site (NTS) Defense Waste Acceptance Criteria, Certification and Transfer Requirements establishes procedures and criteria for safe transfer, disposal, and storage of defense transuranic, low-level, and mixed waste at the NTS. Included are an overview of the NTS defense waste management program; the NTS waste acceptance criteria for transuranic, low-level, and mixed wastes; waste certification requirements and guidance; application to submit waste; and requirements for waste transfer and receipt. 5 figs., 16 tabs

  14. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    Energy Technology Data Exchange (ETDEWEB)

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  15. DACS upgrade acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations

  16. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1997-01-01

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack of installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report

  17. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging

  18. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  19. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  20. Acceptance test report for 241-AW process air system

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    The acceptance test procedure (ATP) for the compressed air system at building 241-AW-273 was completed on March 11, 1993. The system was upgraded to provide a reliable source of compressed air to the tank farm. The upgrade included the demolition of the existing air compressor and associated piping, as well as the installation of a new air compressor with a closed loop cooling system. A compressed air cross-tie was added to allow the process air compressor to function as a back-up to the existing instrument air compressor. The purpose of the ATP was to achieve three primary objectives: verify system upgrade in accordance with the design media; provide functional test of system components and controls; and prepare the system for the Operational Test. The ATP was successfully completed with thirteen exceptions, which were resolved prior to completing the acceptance test. The repaired exceptions had no impact to safety or the environment and are briefly summarized. Testing ensured that the system was installed per design, that its components function as required and that it is ready for operational testing and subsequent turnover to operations

  1. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... provided less forecast accuracy improvement and it needed a longer time to achieve relatively acceptable forecast uncertainty....

  2. Displacement compressors - acceptance tests

    CERN Document Server

    International Organization for Standardization. Geneva

    1996-01-01

    ISO 1217:2009 specifies methods for acceptance tests regarding volume rate of flow and power requirements of displacement compressors. It also specifies methods for testing liquid-ring type compressors and the operating and testing conditions which apply when a full performance test is specified.

  3. Conditions for acceptance and usage of mobile payment procedures

    OpenAIRE

    Pousttchi, Key

    2003-01-01

    Mobile payment (MP) is crucial for, but not limited to mobile commerce. The key to mobile payment acceptance is in the hands of customers. In this paper we examine the conditions for acceptance and actual usage of MP procedures by the customer. We identify essential conditions which belong to the categories costs, security and convenience. Different preferences lead to an individual set of essential conditions for any single user. We propose a scheme for their representation and comparison an...

  4. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  5. Project W-320 acceptance test report for AY-farm electrical distribution

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the AY-Farm Electrical Distribution System functions as required by the design criteria. This test is divided into three parts to support the planned construction schedule; Section 8 tests Mini-Power Pane AY102-PPI and the EES; Section 9 tests the SSS support systems; Section 10 tests the SSS and the Multi-Pak Group Control Panel. This test does not include the operation of end-use components (loads) supplied from the distribution system. Tests of the end-use components (loads) will be performed by other W-320 ATPs

  6. Acceptance Testing Of Web Applications With Test Description Language

    Directory of Open Access Journals (Sweden)

    Łukasz Olek

    2014-01-01

    Full Text Available Acceptance tests are usually created by a client after a part of a system is implemented. However, some methodologies propose the elaboration of test cases before implementing a system. This approach increases the probability of system implementation that fulfills requirements, but may be problematic for customers and testers. To allow acceptance testing in such conditions, we propose to define test cases by recording them on an interactive mockup (a low detailed user-interface prototype. The paper focuses on Test Description Language, a notation used to store test cases.

  7. 40 CFR 63.1365 - Test methods and initial compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... permit limit applicable to the process vent. (D) Design analysis based on accepted chemical engineering... concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design... procedures specified in Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical...

  8. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  9. RISK ANALYSES USED IN ACCEPTANCE TESTING

    Directory of Open Access Journals (Sweden)

    Oxana STOROJ

    2016-06-01

    Full Text Available This article is talking about risk based testing approach in user acceptance testing UAT (User Acceptance Testing. There are presented definitions of risk and risk based testing. In addition, we are talking about risks that can appear during UAT and we are describing the process of testing based on risks. We propose some techniques and methods of identifying risks such as using Brainstorming, Delphi method,probability analysis method and others. Also, risk traceability matrix is presented as a method of prioritizing risks.

  10. User Acceptance of YouTube for Procedural Learning: An Extension of the Technology Acceptance Model

    Science.gov (United States)

    Lee, Doo Young; Lehto, Mark R.

    2013-01-01

    The present study was framed using the Technology Acceptance Model (TAM) to identify determinants affecting behavioral intention to use YouTube. Most importantly, this research emphasizes the motives for using YouTube, which is notable given its extrinsic task goal of being used for procedural learning tasks. Our conceptual framework included two…

  11. Acceptance sampling for attributes via hypothesis testing and the hypergeometric distribution

    Science.gov (United States)

    Samohyl, Robert Wayne

    2017-10-01

    This paper questions some aspects of attribute acceptance sampling in light of the original concepts of hypothesis testing from Neyman and Pearson (NP). Attribute acceptance sampling in industry, as developed by Dodge and Romig (DR), generally follows the international standards of ISO 2859, and similarly the Brazilian standards NBR 5425 to NBR 5427 and the United States Standards ANSI/ASQC Z1.4. The paper evaluates and extends the area of acceptance sampling in two directions. First, by suggesting the use of the hypergeometric distribution to calculate the parameters of sampling plans avoiding the unnecessary use of approximations such as the binomial or Poisson distributions. We show that, under usual conditions, discrepancies can be large. The conclusion is that the hypergeometric distribution, ubiquitously available in commonly used software, is more appropriate than other distributions for acceptance sampling. Second, and more importantly, we elaborate the theory of acceptance sampling in terms of hypothesis testing rigorously following the original concepts of NP. By offering a common theoretical structure, hypothesis testing from NP can produce a better understanding of applications even beyond the usual areas of industry and commerce such as public health and political polling. With the new procedures, both sample size and sample error can be reduced. What is unclear in traditional acceptance sampling is the necessity of linking the acceptable quality limit (AQL) exclusively to the producer and the lot quality percent defective (LTPD) exclusively to the consumer. In reality, the consumer should also be preoccupied with a value of AQL, as should the producer with LTPD. Furthermore, we can also question why type I error is always uniquely associated with the producer as producer risk, and likewise, the same question arises with consumer risk which is necessarily associated with type II error. The resolution of these questions is new to the literature. The

  12. Nitrogen trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco's facility

  13. Acceptance Test Plan for ANSYS Software

    International Nuclear Information System (INIS)

    CREA, B.A.

    2000-01-01

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled

  14. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    International Nuclear Information System (INIS)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-01-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal

  15. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    Science.gov (United States)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  16. W-025, acceptance test report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This acceptance test report (ATR) has been prepared to establish the results of the field testing conducted on W-025 to demonstrate that the electrical/instrumentation systems functioned as intended by design. This is part of the RMW Land Disposal Facility

  17. L-286, Acceptance Test Record

    International Nuclear Information System (INIS)

    HARMON, B.C.

    2000-01-01

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  18. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  19. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  20. A data base and a standard material for use in acceptance testing of low-activity waste products

    International Nuclear Information System (INIS)

    Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

    1998-04-01

    The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material

  1. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  2. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    International Nuclear Information System (INIS)

    NNSA/NSO Waste Management Project

    2008-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal

  3. Fair play in energy policy decisions: Procedural fairness, outcome fairness and acceptance of the decision to rebuild nuclear power plants

    International Nuclear Information System (INIS)

    Visschers, Vivianne H.M.; Siegrist, Michael

    2012-01-01

    To raise public acceptance of new energy policies, promoting the fairness of the outcomes and of the decision-making procedure has been suggested. Very few studies have examined the role of fairness in public acceptance of rebuilding nuclear power plants. Therefore, using a large mail survey, we investigated the public’s acceptance of the decision to rebuild nuclear power plants in Switzerland by 2020. The study examined the influence of procedural fairness and outcome fairness on the acceptance of this decision, as well as other factors such as risk perception and benefit perception. Additionally, we investigated the moderating influence of general attitudes towards nuclear power on the relation between fairness and decision acceptance. Results indicated that outcome fairness strongly increased decision acceptance, along with general attitudes towards nuclear power and perceived economic benefits. Procedural fairness had only a small impact on decision acceptance. The influence of fairness on decision acceptance did not seem to depend on general nuclear attitudes. Our findings imply that, in the case of rebuilding nuclear power plants, perceived benefits and outcome fairness are important determinants of acceptance of the decision, while procedural fairness only has a limited impact. - Highlights: ► We investigated the role of fairness in the acceptance of a nuclear policy decision. ► Outcome fairness strongly influenced decision acceptance regarding nuclear power plants. ► The role of procedural fairness was relatively small in this respect. ► Also, nuclear attitudes and perceived economic benefits affected decision acceptance. ► Outcome fairness seems more relevant for decision acceptance than procedural fairness.

  4. Hanford Immobilized LAW Product Acceptance: Tanks Focus Area Testing Data Package II

    International Nuclear Information System (INIS)

    Schulz, Rebecca L.; Lorier, Troy H.; Peeler, David K.; Brown, Kevin G.; Reamer, Irene A.; Vienna, John D.; Jiricka, Antonin; Jorgensen, Benaiah M.; Smith, Donald E.

    2001-01-01

    This report is a continuation of the Hanford Immobilized Low Activity Waste (LAW) Product Acceptance (HLP): Initial Tanks Focus Area Testing Data Package (Vienna (and others) 2000). In addition to new 5000-h product consistency test (PCT), vapor hydration test (VHT), and alteration products data, some previously reported data together with relevant background information are included for an easily accessible source of reference when comparing the response of the various glasses to different test conditions. A matrix of 55 glasses was developed and tested to identify the impact of glass composition on long-term corrosion behavior and to develop an acceptable composition region for Hanford LAW glasses. Of the 55 glasses, 45 were designed to systematically vary the glass composition, and 10 were selected because large and growing databases on their corrosion characteristics had accumulated. The targeted and measured compositions of these glasses are found in the Appendix A. All glasses were fabricated according to standard procedures and heat treated to simulate the slow cooling that will occur in a portion of the waste glass after vitrification in the planned treatment facility at Hanford

  5. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees) Minimum...

  6. Generator acceptance test and inspection report

    International Nuclear Information System (INIS)

    Johns, B.R.

    1997-01-01

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing

  7. User acceptance testing a step-by-step guide

    CERN Document Server

    Hambling, Brian

    2013-01-01

    Every information system brought into service in every type of organisation requires user acceptance testing. This book is a hands-on manual for non-testing specialists to plan and carry out an effective acceptance test of an information system. It also identifies ways of making the process as simple and cost-effective as possible.

  8. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  9. Nevada Test Site Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-01-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site

  10. A Bayesian decision procedure for testing multiple hypotheses in DNA microarray experiments.

    Science.gov (United States)

    Gómez-Villegas, Miguel A; Salazar, Isabel; Sanz, Luis

    2014-02-01

    DNA microarray experiments require the use of multiple hypothesis testing procedures because thousands of hypotheses are simultaneously tested. We deal with this problem from a Bayesian decision theory perspective. We propose a decision criterion based on an estimation of the number of false null hypotheses (FNH), taking as an error measure the proportion of the posterior expected number of false positives with respect to the estimated number of true null hypotheses. The methodology is applied to a Gaussian model when testing bilateral hypotheses. The procedure is illustrated with both simulated and real data examples and the results are compared to those obtained by the Bayes rule when an additive loss function is considered for each joint action and the generalized loss 0-1 function for each individual action. Our procedure significantly reduced the percentage of false negatives whereas the percentage of false positives remains at an acceptable level.

  11. 241-AN-A valve pit manifold valves and position indication acceptance test procedure

    Energy Technology Data Exchange (ETDEWEB)

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  12. Acceptance Test Report for 241-U compressed air system

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027

  13. Nevada Test Site Waste Acceptance Criteria, December 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  14. Nevada Test Site Waste Acceptance Criteria, December 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal

  15. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  16. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  17. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  18. Judgments of Restrictiveness, Social Acceptability, and Usage: Review of Research on Procedures to Decrease Behavior

    OpenAIRE

    Morgan, Robert L.

    1989-01-01

    Research on professionals’, consumers’, and others’ judgments of the restrictiveness, social acceptability, and estimated frequency of use of procedures to decrease behavior were reviewed. General findings were that (a) respondents generally were consistent in rating procedures from least to most restrictive; (b) most respondents agreed that procedures judged more restrictive should be used as a last resort; (c) more restrictive procedures were not frequently used in practice; (d) respondents...

  19. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 10: D2X Hub Prototype Acceptance Test Plan and Summary Report.

    Science.gov (United States)

    2017-10-27

    This Devices to Everything (D2X) Acceptance Test Plan (ATP) and Summary Report provides the plan, test cases, and test procedures that were used to verify Prototype System (version 2.0) system requirements, as well as a summary of results of the test...

  20. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  1. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  2. Acceptability of Functional Behavioral Assessment Procedures to Special Educators and School Psychologists

    Science.gov (United States)

    O'Neill, Robert E.; Bundock, Kaitlin; Kladis, Kristin; Hawken, Leanne S.

    2015-01-01

    This survey study assessed the acceptability of a variety of functional behavioral assessment (FBA) procedures (i.e., functional assessment interviews, rating scales/questionnaires, systematic direct observations, functional analysis manipulations) to a national sample of 123 special educators and a state sample of 140 school psychologists.…

  3. Multiport riser and flange assemblies acceptance test report

    International Nuclear Information System (INIS)

    Precechtel, D.R.; Schroeder, B.K.

    1994-01-01

    This document presents the results of the acceptance test for the multiport riser (MPR) and multiport flange (MPF) assemblies. The accepted MPR and MPF assemblies will be used in support of the hydrogen mitigation project for double-shell waste tank 241-SY-101 and other related projects. The testing described in this document verifies that the mechanical and interface features are operating as designed and that the unit is ready for field service. The objectives of the acceptance testing were as follows: Basic equipment functions and mechanical interfaces were verified; Installation and removal of equipment were demonstrated to the degree possible; Operation of the decon spray system and all valving was confirmed; and the accumulated leak rate of the MPR and MPF assemblies was determined

  4. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  5. Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    The purpose of the test was to verify that the AN Tank Farm Encasement Leak Detector components are functionally integrated and operate in accordance with engineering design specifications The Acceptance Test Procedure HNF-4650, SN-268 Encasement Leak Detection ANA-W-LDSTA-335, was conducted between 22 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure, were found to be labeled and identified as written in the procedure

  6. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  7. Automation of the testing procedure

    International Nuclear Information System (INIS)

    Haas, H.; Fleischer, M.; Bachner, E.

    1979-01-01

    For the judgement of technologies applied and the testing of specific components of the HTR primary circuit, complex test procedures and data evaluations are required. Extensive automation of these test procedures is indispensable. (orig.) [de

  8. Electrical/instrumentation acceptance test report for Project C-018H, 242-A Evaporator/PUREX Plant condensate treatment facility

    International Nuclear Information System (INIS)

    Compau, R.A. Jr.

    1995-01-01

    This project is part of the 200 Area Effluent Treatment Facility. The acceptance test procedure describes test methods for leak detection units, pump flow switches, pump level control valves, room air temperature monitor, leachate pump status contacts, basin pump status contacts, catch basin leak detector, leachate level monitors, and basin level monitors. These are all components of the C-018H Collection System

  9. Breathing air trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller's location

  10. Preparation of acceptance tests and criteria for the Test Blanket Systems to be operated in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Laan, J.G. van der, E-mail: JaapG.vanderLaan@iter.org [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Cuquel, B. [AIRBUS Defence and Space S.A.S., 13115 Saint Paul Lez Durance (France); Demange, D.; Ghidersa, B.-E. [Karlsruhe Institute of Technology, Karlsruhe (Germany); Giancarli, L.M.; Iseli, M.; Jourdan, T. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Pascal, R.; Ring, W. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER. • These tests complement those required by the applicable codes and standards, and regulations. • Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment. • Next steps are “Reception Inspection Tests”, and on-site pre-installation and components tests. • This guideline allows the detailing of the TBS specific test plans and their scheduling. - Abstract: This paper describes the main acceptance criteria and required acceptance tests for the components of the six Test Blanket Systems to be installed and operated in ITER. It summarizes the guide-line toward the establishment of detailed test plans for the TBS, starting from the end-product at the ITER Members factories, and to generally define the type of tests that have to be performed on the ITER site after shipment, and/or prior to the systems final commissioning phase.

  11. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  12. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  13. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    Science.gov (United States)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  14. Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    The purpose of the test was to verify that the AN Tank Farm B Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4646,241-AN-B-Pit Leak Detection ANB-WT-LDSTA-231 was conducted between 26 June and 02 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as written in the procedure

  15. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  16. Nevada Test Site Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-01-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal

  17. Do Ethical Judgments Depend on the Type of Response Scale? Comparing Acceptability versus Unacceptability Judgments in the Case of Life-Ending Procedures

    Directory of Open Access Journals (Sweden)

    Etienne Mullet

    2010-01-01

    Full Text Available Using Functional Measurement (Anderson, 2008, Frileux, Lelièvre, Muñoz Sastre, Mullet, and Sorum (2003 examined the joint impact of several key factors on lay people's judgments of the acceptability of physicians' interventions to end patients' lives. The level of acceptability was high, and the information integration rule that best described the participants' judgments was Acceptability = Patient's Request + Patient's Age + Residual Suffering + Incurability. Critics suggested, however, that acceptability was high because the ethical problem was framed in terms of acceptability (Murphy, 2007. Presenting participants with acceptability scales may have caused the life-ending procedure to be represented in participants' mind as basically "acceptable". By contrast, presenting participants with unacceptability scales might cause the procedure to be represented as basically "unacceptable". In the present study, therefore, we directly compared lay people's judgments of the acceptability of life-ending procedures under two opposite conditions - an acceptability condition, and an unacceptability condition. The life-ending procedure did not appear as more acceptable to participants responding in terms of acceptability than to those responding in terms of unacceptability. In addition, the impacts of the factors describing the end-of-life situations were not affected by the type of judgment scale that was used. Functional Measurement seems to be resistant to goal-framing effects; the findings that have been observed using acceptability scales can be considered as robust.

  18. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  19. Standardization of waste acceptance test methods by the Materials Characterization Center

    International Nuclear Information System (INIS)

    Slate, S.C.

    1985-01-01

    This paper describes the role of standardized test methods in demonstrating the acceptability of high-level waste (HLW) forms for disposal. Key waste acceptance tests are standardized by the Materials Characterization Center (MCC), which the US Department of Energy (DOE) has established as the central agency in the United States for the standardization of test methods for nuclear waste materials. This paper describes the basic three-step process that is used to show that waste is acceptable for disposal and discusses how standardized tests are used in this process. Several of the key test methods and their areas of application are described. Finally, future plans are discussed for using standardized tests to show waste acceptance. 9 refs., 1 tab

  20. Toddler test or procedure preparation

    Science.gov (United States)

    ... a test or procedure: Explain the procedure in language your child understands, using plain words. Avoid abstract terms. Make sure your child understands the exact body part involved in the test, and that the ...

  1. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  2. Commissioning and Acceptance Testing of the existing linear accelerator upgraded to volumetric modulated arc therapy

    Science.gov (United States)

    Varadharajan, Ekambaram; Ramasubramanian, Velayudham

    2013-01-01

    Aim The RapidArc commissioning and Acceptance Testing program will test and ensure accuracy in DMLC position, precise dose-rate control during gantry rotation and accurate control of gantry speed. Background Recently, we have upgraded our linear accelerator capable of performing IMRT which was functional from 2007 with image guided RapidArc facility. The installation of VMAT in the existing linear accelerator is a tedious process which requires many quality assurance procedures before the proper commissioning of the facility and these procedures are discussed in this study. Materials and methods Output of the machine at different dose rates was measured to verify its consistency at different dose rates. Monitor and chamber linearity at different dose rates were checked. DMLC QA comprising of MLC transmission factor measurement and dosimetric leaf gap measurements were performed using 0.13 cm3 and 0.65 cm3 Farmer type ionization chamber, dose 1 dosimeter, and IAEA 30 cm × 30 cm × 30 cm water phantom. Picket fence test, garden fence test, tests to check leaf positioning accuracy due to carriage movement, calibration of the leaves, leaf speed stability effects due to the acceleration and deceleration of leaves, accuracy and calibration of leaves in producing complex fields, effects of interleaf friction, etc. were verified using EDR2 therapy films, Vidar scanner, Omnipro accept software, amorphous silicon based electronic portal imaging device and EPIQA software.1–8 Results All the DMLC related quality assurance tests were performed and evaluated by film dosimetry, portal dosimetry and EPIQA.7 Conclusion Results confirmed that the linear accelerator is capable of performing accurate VMAT. PMID:24416566

  3. Commissioning and Acceptance Testing of the existing linear accelerator upgraded to volumetric modulated arc therapy.

    Science.gov (United States)

    Varadharajan, Ekambaram; Ramasubramanian, Velayudham

    2013-01-01

    The RapidArc commissioning and Acceptance Testing program will test and ensure accuracy in DMLC position, precise dose-rate control during gantry rotation and accurate control of gantry speed. Recently, we have upgraded our linear accelerator capable of performing IMRT which was functional from 2007 with image guided RapidArc facility. The installation of VMAT in the existing linear accelerator is a tedious process which requires many quality assurance procedures before the proper commissioning of the facility and these procedures are discussed in this study. Output of the machine at different dose rates was measured to verify its consistency at different dose rates. Monitor and chamber linearity at different dose rates were checked. DMLC QA comprising of MLC transmission factor measurement and dosimetric leaf gap measurements were performed using 0.13 cm(3) and 0.65 cm(3) Farmer type ionization chamber, dose 1 dosimeter, and IAEA 30 cm × 30 cm × 30 cm water phantom. Picket fence test, garden fence test, tests to check leaf positioning accuracy due to carriage movement, calibration of the leaves, leaf speed stability effects due to the acceleration and deceleration of leaves, accuracy and calibration of leaves in producing complex fields, effects of interleaf friction, etc. were verified using EDR2 therapy films, Vidar scanner, Omnipro accept software, amorphous silicon based electronic portal imaging device and EPIQA software.(1-8.) All the DMLC related quality assurance tests were performed and evaluated by film dosimetry, portal dosimetry and EPIQA.(7.) Results confirmed that the linear accelerator is capable of performing accurate VMAT.

  4. Evaluation of acceptance strength tests for concrete pavements.

    Science.gov (United States)

    2005-06-30

    The North Carolina Department of Transportation has used traditionally flexural strength tests for acceptance : testing of Portland cement concrete pavements. This report summarizes a research project implemented to : investigate the feasibility of u...

  5. Nevada test site waste acceptance criteria

    International Nuclear Information System (INIS)

    1996-01-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document

  6. Nevada test site waste acceptance criteria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  7. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  8. Neutron absorber qualification and acceptance testing from the designer's perspective

    International Nuclear Information System (INIS)

    Bracey, W.; Chiocca, R.

    2004-01-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3σ. The original and current bases for the reduced 10 B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and process controls

  9. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  10. Acceptability of HIV self-testing: a systematic literature review.

    Science.gov (United States)

    Krause, Janne; Subklew-Sehume, Friederike; Kenyon, Chris; Colebunders, Robert

    2013-08-08

    The uptake of HIV testing and counselling services remains low in risk groups around the world. Fear of stigmatisation, discrimination and breach of confidentiality results in low service usage among risk groups. HIV self-testing (HST) is a confidential HIV testing option that enables people to find out their status in the privacy of their homes. We evaluated the acceptability of HST and the benefits and challenges linked to the introduction of HST. A literature review was conducted on the acceptability of HST in projects in which HST was offered to study participants. Besides acceptability rates of HST, accuracy rates of self-testing, referral rates of HIV-positive individuals into medical care, disclosure rates and rates of first-time testers were assessed. In addition, the utilisation rate of a telephone hotline for counselling issues and clients` attitudes towards HST were extracted. Eleven studies met the inclusion criteria (HST had been offered effectively to study participants and had been administered by participants themselves) and demonstrated universally high acceptability of HST among study populations. Studies included populations from resource poor settings (Kenya and Malawi) and from high-income countries (USA, Spain and Singapore). The majority of study participants were able to perform HST accurately with no or little support from trained staff. Participants appreciated the confidentiality and privacy but felt that the provision of adequate counselling services was inadequate. The review demonstrates that HST is an acceptable testing alternative for risk groups and can be performed accurately by the majority of self-testers. Clients especially value the privacy and confidentiality of HST. Linkage to counselling as well as to treatment and care services remain major challenges.

  11. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  12. SU-F-T-475: An Evaluation of the Overlap Between the Acceptance Testing and Commissioning Processes for Conventional Medical Linear Accelerators

    International Nuclear Information System (INIS)

    Morrow, A; Rangaraj, D; Perez-Andujar, A; Krishnamurthy, N

    2016-01-01

    Purpose: This work’s objective is to determine the overlap of processes, in terms of sub-processes and time, between acceptance testing and commissioning of a conventional medical linear accelerator and to evaluate the time saved by consolidating the two processes. Method: A process map for acceptance testing for medical linear accelerators was created from vendor documentation (Varian and Elekta). Using AAPM TG-106 and inhouse commissioning procedures, a process map was created for commissioning of said accelerators. The time to complete each sub-process in each process map was evaluated. Redundancies in the processes were found and the time spent on each were calculated. Results: Mechanical testing significantly overlaps between the two processes - redundant work here amounts to 9.5 hours. Many beam non-scanning dosimetry tests overlap resulting in another 6 hours of overlap. Beam scanning overlaps somewhat - acceptance tests include evaluating PDDs and multiple profiles but for only one field size while commissioning beam scanning includes multiple field sizes and depths of profiles. This overlap results in another 6 hours of rework. Absolute dosimetry, field outputs, and end to end tests are not done at all in acceptance testing. Finally, all imaging tests done in acceptance are repeated in commissioning, resulting in about 8 hours of rework. The total time overlap between the two processes is about 30 hours. Conclusion: The process mapping done in this study shows that there are no tests done in acceptance testing that are not also recommended to do for commissioning. This results in about 30 hours of redundant work when preparing a conventional linear accelerator for clinical use. Considering these findings in the context of the 5000 linacs in the United states, consolidating acceptance testing and commissioning would have allowed for the treatment of an additional 25000 patients using no additional resources.

  13. SU-F-T-475: An Evaluation of the Overlap Between the Acceptance Testing and Commissioning Processes for Conventional Medical Linear Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, A [Scott & White Hospital Temple, TX (United States); Rangaraj, D [Baylor Scott & White Health, Temple, TX (United States); Perez-Andujar, A [University of California San Francisco, San Francisco, CA (United States); Krishnamurthy, N [Baylor Scott & White Healthcare, Temple, TX (United States)

    2016-06-15

    Purpose: This work’s objective is to determine the overlap of processes, in terms of sub-processes and time, between acceptance testing and commissioning of a conventional medical linear accelerator and to evaluate the time saved by consolidating the two processes. Method: A process map for acceptance testing for medical linear accelerators was created from vendor documentation (Varian and Elekta). Using AAPM TG-106 and inhouse commissioning procedures, a process map was created for commissioning of said accelerators. The time to complete each sub-process in each process map was evaluated. Redundancies in the processes were found and the time spent on each were calculated. Results: Mechanical testing significantly overlaps between the two processes - redundant work here amounts to 9.5 hours. Many beam non-scanning dosimetry tests overlap resulting in another 6 hours of overlap. Beam scanning overlaps somewhat - acceptance tests include evaluating PDDs and multiple profiles but for only one field size while commissioning beam scanning includes multiple field sizes and depths of profiles. This overlap results in another 6 hours of rework. Absolute dosimetry, field outputs, and end to end tests are not done at all in acceptance testing. Finally, all imaging tests done in acceptance are repeated in commissioning, resulting in about 8 hours of rework. The total time overlap between the two processes is about 30 hours. Conclusion: The process mapping done in this study shows that there are no tests done in acceptance testing that are not also recommended to do for commissioning. This results in about 30 hours of redundant work when preparing a conventional linear accelerator for clinical use. Considering these findings in the context of the 5000 linacs in the United states, consolidating acceptance testing and commissioning would have allowed for the treatment of an additional 25000 patients using no additional resources.

  14. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  15. Acceptance test for graphite components and construction status of HTTR

    International Nuclear Information System (INIS)

    Iyoku, T.; Ishihara, M.; Maruyama, S.; Shiozawa, S.; Tsuji, N.; Miki, T.

    1996-01-01

    In March, 1991, the Japan Atomic Energy Research Institute (JAERI) started to constructed the High Temperature engineering Test Reactor(HTTR) which is a 30-MW(thermal) helium gas-cooled reactor with a core composed of prismatic graphite blocks piled on the core support graphite structures. Two types of graphite materials are used in the HTTR. One is the garde IG-110, isotropic fine grain graphite, another is the grade PGX, medium-to-fine grained molded graphite. These materials were selected on the basis of the appropriate properties required by the HTTR reactor design. Industry-wide standards for an acceptance test of graphite materials used as main components of a nuclear reactor had not been established. The acceptance standard for graphite components of the HTTR, therefore, was drafted by JAERI and reviewed by specialists outside JAERI. The acceptance standard consists of the material testing, non-destructive examination such as the ultrasonic and eddy current testings, dimensional and visual inspections and assembly test. Ultrasonic and eddy current testings are applied to graphite logs to detect an internal flaw and to graphite components to detect a surface flaw, respectively. The assembly test is performed at the works, prior to their installation in the reactor pressure vessel, to examine fabricating precision of each component and alignment of piled-up structures. The graphite components of the HTTR had been tested on the basis of the acceptance standard. It was confirmed that the graphite manufacturing process was well controlled and high quality graphite components were provided to the HTTR. All graphite components except for the fuel graphite blocks are to be installed in the reactor pressure vessel of the HTTR in September 1995. The paper describes the construction status of the HTTR focusing on the graphite components. The acceptance test results are also presented in this paper. (author). Figs

  16. MBA acceptance test procedures, software Version 1.4

    International Nuclear Information System (INIS)

    Mullaney, J.E.; Russell, V.K.

    1994-01-01

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness

  17. On the comparability of acceptance tests for concrete by operation characteristics

    International Nuclear Information System (INIS)

    Rackwitz, R.

    1978-01-01

    The purely statistical aspect of acceptance tests can be estimated by means of operation characteristics, the position and steepness of which determine the probability for acceptance or rejection of offered loads. For negative decisions in concrete checking there will be, as a rule, an after-check in normal quality control. The operation characteristics with after-check valid for DIN 1045, DIN 1084, and DIN 1048 are set up. Complete comparability of different acceptance tests by means of the operation characteristic can only be achieved if the different sampling rates and the number of decisions are also included in the consideration. Proposals for improving the acceptance tests for concrete are presented. (orig.) [de

  18. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    Science.gov (United States)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  19. Gas characterization system software acceptance test report

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  20. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  1. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    the two locations were compared to determine if the contents of the tank were well mixed. The Coliwasa sampler is a tube with a stopper at the bottom and is designed to obtain grab samples from specific locations within the drum contents. A position paper (4) was issued to address the prototypic flow loop issues and simulant selections. A statistically designed plan (5) was issued to address the total number of samples each sampler needed to pull, to provide the random order in which samples were pulled and to group samples for elemental analysis. The TTR required that the Isolok sampler perform as well as the Hydragard sampler during these tests to ensure the acceptability of the Isolok sampler for use in the DWPF sampling cells. Procedure No.L9.4-5015 was used to document the sample parameters and process steps. Completed procedures are located in R&D Engineering job folder 23269.

  2. Efficacy, safety, and patient acceptability of the Essure™ procedure

    Directory of Open Access Journals (Sweden)

    Hopkins MR

    2011-04-01

    Full Text Available Collette R Lessard, Matthew R HopkinsDepartment of Obstetrics and Gynecology, Mayo Clinic, Rochester, Minnesota, USAAbstract: The Essure™ system for permanent contraception was developed as a less invasive method of female sterilization. Placement of the Essure™ coil involves a hysteroscopic transcervical technique. This procedure can be done in a variety of settings and with a range of anesthetic options. More than eight years have passed since the US Food and Drug Administration approval of Essure™. Much research has been done to evaluate placement success, adverse outcomes, satisfaction, pain, and the contraceptive efficacy of the Essure™. The purpose of this review is to summarize the available literature regarding the efficacy, safety, and patient satisfaction with this new sterilization technique.Keywords: hysteroscopic sterilization, Essure™, safety, efficacy, acceptability

  3. The Northern regional programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the UK Northern Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. Organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, the final visit just prior to the end of the manufacturers warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details limiting values for the acceptance test measurements are given. In some instances testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  4. Understanding patient acceptance and refusal of HIV testing in the emergency department

    Directory of Open Access Journals (Sweden)

    Christopoulos Katerina A

    2012-01-01

    Full Text Available ABSTRACT Background Despite high rates of patient satisfaction with emergency department (ED HIV testing, acceptance varies widely. It is thought that patients who decline may be at higher risk for HIV infection, thus we sought to better understand patient acceptance and refusal of ED HIV testing. Methods In-depth interviews with fifty ED patients (28 accepters and 22 decliners of HIV testing in three ED HIV testing programs that serve vulnerable urban populations in northern California. Results Many factors influenced the decision to accept ED HIV testing, including curiosity, reassurance of negative status, convenience, and opportunity. Similarly, a number of factors influenced the decision to decline HIV testing, including having been tested recently, the perception of being at low risk for HIV infection due to monogamy, abstinence or condom use, and wanting to focus on the medical reason for the ED visit. Both accepters and decliners viewed ED HIV testing favorably and nearly all participants felt comfortable with the testing experience, including the absence of counseling. While many participants who declined an ED HIV test had logical reasons, some participants also made clear that they would prefer not to know their HIV status rather than face psychosocial consequences such as loss of trust in a relationship or disclosure of status in hospital or public health records. Conclusions Testing for HIV in the ED as for any other health problem reduces barriers to testing for some but not all patients. Patients who decline ED HIV testing may have rational reasons, but there are some patients who avoid HIV testing because of psychosocial ramifications. While ED HIV testing is generally acceptable, more targeted approaches to testing are necessary for this subgroup.

  5. Inspection Program Development for an Aircraft Fleet and an Airline on the Basis of the Acceptance Fatigue Test Result

    Directory of Open Access Journals (Sweden)

    Paramonov Yuri

    2015-02-01

    Full Text Available An inspection interval planning is considered in order to limit the probability of any fatigue failure (FFP in a fleet of N aircraft (AC and to provide an economical effectiveness of airline (AL under the limitation of fatigue failure rate (FFR. A solution of these two problems is based on the processing of the result of acceptance fatigue test of a new type of aircraft. During this test an estimate of the parameter ϴ, of a fatigue crack growth trajectory has been obtained. If the result of this acceptance test is too bad then this new type of aircraft will not be used in service. A redesign of this project should be done. If the result the acceptance test is pretty good then the reliability of the aircraft fleet and the airline will be provided without inspections. For this strategy there is a maximum of FFP (a maximum of FFR as a function of an unknown parameter ᶿ. This maximum can be limited by the use of the offered here procedure of the choice of the inspection number. The economic effectiveness of the AL operation is considered using the theory of Markov process with rewords.

  6. Automatically generated acceptance test: A software reliability experiment

    Science.gov (United States)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  7. Analysis of the acceptance procedure and quality control a virtual simulation system

    International Nuclear Information System (INIS)

    Gonzalez Ruiz, C.; Pedrero de Aristizabal, D.; Jimenez Rojas, R.; Garcia Hernandez, M. J.; Ruiz Galan, G.; Ayala Lazaro, R.; Garcia Marcos, R.

    2011-01-01

    Acceptance has been made, determining the reference state, commissioning and implementation of control protocol virtual simulation system consists of an image acquisition unit of computerized tomography (CT), an independent external location laser locator and a simulation module associated with the existing scheduler for clinical dosimetry in radiotherapy. This paper summarizes the path followed in this process, together with the established procedure for periodic monitoring and analysis system of the results obtained in the two years of clinical and control.

  8. Safety panel and new procedures evaluation by simulator tests

    International Nuclear Information System (INIS)

    Meslin, T.

    1986-01-01

    With more than thirty weeks of simulator testing (for the last three years only) and approximately three hundred scenarios, EDF's experience in this field is extensive. This practice is well known within Fossil and Nuclear Generation and is well accepted by the operating teams which participate in it. Simulator testing appears to be an essential decision-making tool in the process of developing new operating aids in PWR plants. Accelerated development and the elimination of long and expensive modifications after commissioning is an economic advantage. The saving in time is obvious, since modifications are carried out continuously throughout the development phase. Finally, operators participate in the development of systems and receive fixed, well-defined applications. This practice has become systematic, and all new applications concerning the operation of PWR plants are simulator-tested, particularly 1300-MW unit computers and operating procedures, the new generation of 900-MW unit computers, and the new 1500-MW fully computerized control rooms. Finally, this simulator testing allows us to considerably increase our knowledge concerning the behavior of operators in accident situations, and special tests are performed for this purpose

  9. Acceptability of rapid diagnostic test-based management of Malaria among caregivers of under-five children in rural Ghana.

    Directory of Open Access Journals (Sweden)

    Frank Baiden

    Full Text Available WHO now recommends test-based management of malaria (TBMM across all age-groups. This implies artemisinin-based combination treatment (ACT should be restricted to rapid diagnostic test (RDT-positive cases. This is a departure from what caregivers in rural communities have been used to for many years.We conducted a survey among caregivers living close to 32 health centres in six districts in rural Ghana and used logistic regression to explore factors likely to influence caregiver acceptability of RDT based case management and concern about the denial of ACT on account of negative RDT results. Focus group discussions were conducted to explain the quantitative findings and to elicit further factors.A total of 3047 caregivers were interviewed. Nearly all (98% reported a preference for TBMM over presumptive treatment. Caregivers who preferred TBMM were less likely to be concerned about the denial of ACT to their test-negative children (O.R. 0.57, 95%C.I. 0.33-0.98. Compared with caregivers who had never secured national health insurance cover, caregivers who had valid (adjusted O.R. 1.30, 95% CI 1.07-1.61 or expired (adjusted O.R. 1.38, 95% CI 1.12-1.73 insurance cover were more likely to be concerned about the denial of ACT to their RDT-negative children. Major factors that promote TBMM acceptability include the perception that a blood test at health centre level represents improvement in the quality of care, leads to improvement in treatment outcomes, and offers opportunity for better communication between health workers and caregivers. Acceptability is also enhanced by engaging caregivers in the procedures of the test. Apprehensions about negative health worker attitude could however undermine acceptance.Test (RDT-based management of malaria in under-five children is likely to be acceptable to caregivers in rural Ghana. The quality of caregiver-health worker interaction needs to be improved if acceptability is to be sustained.

  10. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    International Nuclear Information System (INIS)

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-01-01

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits

  11. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    Energy Technology Data Exchange (ETDEWEB)

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G [Baystate Health Systems, Inc., Springfield, MA (United States)

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  12. The Northern Regional Programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. The organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, and the final visit just prior to the end of the manufacturer's warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first visit. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details of the limiting values for the acceptance test measurements are given. The results of the programme are discussed. In some instances the testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  13. W-026, acceptance test report manipulator system

    International Nuclear Information System (INIS)

    Watson, T.L.

    1997-01-01

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests

  14. MAC mini acceptance test procedure, software Version 3.0

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness

  15. MAC mini acceptance test procedures, software Version 3.3

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness

  16. Physics acceptance and QA procedures for IMRT

    International Nuclear Information System (INIS)

    LoSasso, T.; Ling, C.

    2001-01-01

    QA program for DMLC. We distinguish between the preliminary preparations for clinical DMLC implementation (i.e., acceptance testing and commissioning), the routine QA of DMLC performance (machine QA), and the verification of patient-specific IM fields using DMLC (treatment QA). Since our initial DMLC implementation in 1995, there have been a number of incremental improvements to our overall QA program. These include methods of mechanical and dosimetric measurements, and software tools developed either by us or by the manufacturer. The use of EPID (electronic portal imaging devise), which potentially provide a more efficient, but certainly not 'cost-free' method, awaits improvements in the speed of data acquisition and in spatial resolution. Our current approach integrates existing methods, combining periodic QA and computer verification, to provide the necessary quality assurance in a safe and efficient manner. Copyright (2001) Australasian College of Physical Scientists and Engineers in Medicine

  17. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy...

  18. Acceptability of self-collected vaginal samples for HPV testing in an ...

    African Journals Online (AJOL)

    Objective: To evaluate the acceptability of self-collected vaginal samples for HPV testing in women living in rural and urban areas of ... Conclusion: Acceptability of self-sampling for HPV testing was similarly excellent in both groups despite their difference in terms ... cancer is the leading cause of death caused by cancer in.

  19. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    Science.gov (United States)

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. 241-SY-101 DACS instrument problem screen (SCR 448) acceptance test procedure

    International Nuclear Information System (INIS)

    ERMI, A.M.

    1999-01-01

    The operability of the 241-SY-101 Data Acquisition and Control System (DACS) to provide proper control and monitoring of the mitigation mixer pump and instrumentation installed in the 241-SY-101 underground storage tank utilizing the [INSTPROB] screen will be systematically evaluated by the performance of this procedure

  1. Formulation of a candidate glass for use as an acceptance test standard material

    International Nuclear Information System (INIS)

    Ebert, W.L.; Strachan, D.M.; Wolf, S.F.

    1998-04-01

    In this report, the authors discuss the formulation of a glass that will be used in a laboratory testing program designed to measure the precision of test methods identified in the privatization contracts for the immobilization of Hanford low-activity wastes. Tests will be conducted with that glass to measure the reproducibility of tests and analyses that must be performed by glass producers as a part of the product acceptance procedure. Test results will be used to determine if the contractually required tests and analyses are adequate for evaluating the acceptability of likely immobilized low-activity waste (ILAW) products. They will also be used to evaluate if the glass designed for use in these tests can be used as an analytical standard test material for verifying results reported by vendors for tests withg ILAW products. The results of those tests and analyses will be presented in a separate report. The purpose of this report is to document the strategy used to formulate the glass to be used in the testing program. The low-activity waste reference glass LRM that will be used in the testing program was formulated to be compositionally similar to ILAW products to be made with wastes from Hanford. Since the ILAW product compositions have not been disclosed by the vendors participating in the Hanford privatization project, the composition of LRM was formulated based on simulated Hanford waste stream and amounts of added glass forming chemicals typical for vitrified waste forms. The major components are 54 mass % SiO 2 , 20 mass % Na 2 O, 10 mass % Al 2 O 3 , 8 mass % B 2 O 3 , and 1.5 mass % K 2 O. Small amounts of other chemicals not present in Hanford wastes were also included in the glass, since they may be included as chemical additives in ILAW products. This was done so that the use of LRM as a composition standard could be evaluated. Radionuclides were not included in LRM because a nonradioactive material was desired

  2. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  3. Dispersant testing : a study on analytical test procedures

    International Nuclear Information System (INIS)

    Fingas, M.F.; Fieldhouse, B.; Wang, Z.; Environment Canada, Ottawa, ON

    2004-01-01

    Crude oil is a complex mixture of hydrocarbons, ranging from small, volatile compounds to very large, non-volatile compounds. Analysis of the dispersed oil is crucial. This paper described Environment Canada's ongoing studies on various traits of dispersants. In particular, it describes small studies related to dispersant effectiveness and methods to improve analytical procedures. The study also re-evaluated the analytical procedure for the Swirling Flask Test, which is now part of the ASTM standard procedure. There are new and improved methods for analyzing oil-in-water using gas chromatography (GC). The methods could be further enhanced by integrating the entire chromatogram rather than just peaks. This would result in a decrease in maximum variation from 5 per cent to about 2 per cent. For oil-dispersant studies, the surfactant-dispersed oil hydrocarbons consist of two parts: GC-resolved hydrocarbons and GC-unresolved hydrocarbons. This study also tested a second feature of the Swirling Flask Test in which the side spout was tested and compared with a new vessel with a septum port instead of a side spout. This decreased the variability as well as the energy and mixing in the vessel. Rather than being a variation of the Swirling Flask Test, it was suggested that a spoutless vessel might be considered as a completely separate test. 7 refs., 2 tabs., 4 figs

  4. Validity, reliability, feasibility, acceptability and educational impact of direct observation of procedural skills (DOPS).

    Science.gov (United States)

    Naeem, Naghma

    2013-01-01

    Direct observation of procedural skills (DOPS) is a new workplace assessment tool. The aim of this narrative review of literature is to summarize the available evidence about the validity, reliability, feasibility, acceptability and educational impact of DOPS. A PubMed database and Google search of the literature on DOPS published from January 2000 to January 2012 was conducted which yielded 30 articles. Thirteen articles were selected for full text reading and review. In the reviewed literature, DOPS was found to be a useful tool for assessment of procedural skills, but further research is required to prove its utility as a workplace based assessment instrument.

  5. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  6. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 6: Prototype Acceptance Test Summary Report

    Science.gov (United States)

    2017-10-30

    The Task 6 Prototype Acceptance Test Summary Report summarizes the results of Acceptance Testing carried out at Battelle facilities in accordance with the Task 6 Acceptance Test Plan. The Acceptance Tests were designed to verify that the prototype sy...

  7. Analysis and optimization of blood-testing procedures.

    NARCIS (Netherlands)

    Bar-Lev, S.K.; Boxma, O.J.; Perry, D.; Vastazos, L.P.

    2017-01-01

    This paper is devoted to the performance analysis and optimization of blood testing procedures. We present a queueing model of two queues in series, representing the two stages of a blood-testing procedure. Service (testing) in stage 1 is performed in batches, whereas it is done individually in

  8. Acceptance test report for portable exhauster POR-007/Skid E

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includes measurements of bearing vibration levels, pressure decay testing, programmable logic controller interlocks, high vacuum, flow and pressure control functional testing. The purpose of Acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-0490, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document

  9. Neutron absorber qualification and acceptance testing from the designer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Bracey, W. [Transnuclear, Inc, Hawthorne, NY (United States); Chiocca, R. [Cogema Logistics, St. Quentin en Yvelines (France)

    2004-07-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3{sigma}. The original and current bases for the reduced {sup 10}B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and

  10. MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

    International Nuclear Information System (INIS)

    CHENAULT, D.M.

    2000-01-01

    Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350

  11. DOT-7A packaging test procedure

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1995-01-01

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes

  12. K West basin isolation barrier leak rate test

    International Nuclear Information System (INIS)

    Whitehurst, R.; McCracken, K.; Papenfuss, J.N.

    1994-01-01

    This document establishes the procedure for performing the acceptance test on the two isolation barriers being installed in K West basin. This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals

  13. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2009-05-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  14. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    International Nuclear Information System (INIS)

    2009-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  15. Tank monitor and control system (TMACS) revision 11 acceptance test procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11 of the Tank Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  16. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    that need to be attained for successful characterization of the planned demonstrators and it deals with the material characterization and prototype testing for the COTECH demonstrators. The summary of this report includes:  General description of COTECH industrial demonstrators  COTECH materials...... and material characterization techniques  Characterization techniques of the COTECH demonstrators  Functionality and lifecycle testing of the COTECH demonstrators Besides the general introduction and conclusion each section of the report is dedicated to the characterization techniques and test procedure.......Characterization techniques and test procedure requirements for innovative self-ligating dental brackets (EO) Section 5.Characterization techniques and test procedure requirements for smart diagnostic chips comprising a microfluidic channel system (GBO) Section 6.Characterization techniques and test procedure...

  17. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  18. Project W-314 acceptance test report HNF-4643 for HNF-4642 241-AN-A valve pit manifold valves and position indication for project W-314

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    The purpose of the test was to verify that the AN Tank Farm Manifold Valves can be manually manipulated to the required operating position and that the electrical and visual indications accurately reflect that position. Physical locking devices were also verified to function. The Acceptance Test Procedure HNF-4642, 241-AN-A Valve Pit Manifold Valves and Position Indication was conducted between 23 June and 10 August 1999 at the 200E AN Tank Farm. The test has no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed, this had an impact on the procedure and test results, ECN 653752 was written to correct the mismatch between the procedure and actual field conditions. P and ID H-14-100941 was changed via ECN-W-314-4C-120. All components, identified in the procedure, were not found to be labeled and identified as written in the procedure, temporary tags were used for operational identification. A retest of valve ANA-WT-V 318 was required because it was removed from its installed position and modified after testing was completed

  19. Automated Transportation Management System (ATMS) V2.0 logistics module PBI acceptance criteria

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1995-01-01

    This document defines the acceptance criteria for the Automated Transportation Management System V2.0 Logistics Module Performance Based Incentive (PBI). This acceptance criteria will be the primary basis for the generation of acceptance test procedures. The purpose of this document is to define the minimum criteria that must be fulfilled to guarantee acceptance of the Logistics Module

  20. Surface moisture measurement system hardware acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  1. Nevada Test Site waste acceptance criteria [Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  2. Nevada Test Site waste acceptance criteria [Revision 1

    International Nuclear Information System (INIS)

    None

    1997-01-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document

  3. Local tolerance testing under REACH: Accepted non-animal methods are not on equal footing with animal tests.

    Science.gov (United States)

    Sauer, Ursula G; Hill, Erin H; Curren, Rodger D; Raabe, Hans A; Kolle, Susanne N; Teubner, Wera; Mehling, Annette; Landsiedel, Robert

    2016-07-01

    In general, no single non-animal method can cover the complexity of any given animal test. Therefore, fixed sets of in vitro (and in chemico) methods have been combined into testing strategies for skin and eye irritation and skin sensitisation testing, with pre-defined prediction models for substance classification. Many of these methods have been adopted as OECD test guidelines. Various testing strategies have been successfully validated in extensive in-house and inter-laboratory studies, but they have not yet received formal acceptance for substance classification. Therefore, under the European REACH Regulation, data from testing strategies can, in general, only be used in so-called weight-of-evidence approaches. While animal testing data generated under the specific REACH information requirements are per se sufficient, the sufficiency of weight-of-evidence approaches can be questioned under the REACH system, and further animal testing can be required. This constitutes an imbalance between the regulatory acceptance of data from approved non-animal methods and animal tests that is not justified on scientific grounds. To ensure that testing strategies for local tolerance testing truly serve to replace animal testing for the REACH registration 2018 deadline (when the majority of existing chemicals have to be registered), clarity on their regulatory acceptance as complete replacements is urgently required. 2016 FRAME.

  4. 40 CFR 53.23 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... deviation about the mean and is expressed in concentration units. (2) Test procedure. (i) Allow sufficient... definition. Positive or negative response caused by a substance other than the one being measured. (2) Test...) Before testing for each interferent, allow the test analyzer to sample through the scrubber a test...

  5. Size and power of pretest procedures

    NARCIS (Netherlands)

    Albers, Willem/Wim; Boon, P.C.; Kallenberg, W.C.M.

    2000-01-01

    A pre-test procedure consists of a preliminary test on a nuisance parameter, investigating whether it equals a given value or not, followed by the main testing problem on the parameter of interest. In case of acceptance of the preliminary test, the main test is applied in the restricted family with

  6. Intelligent Network Flow Optimization (INFLO) prototype acceptance test summary.

    Science.gov (United States)

    2015-05-01

    This report summarizes the results of System Acceptance Testing for the implementation of the Intelligent Network : Flow Optimization (INFLO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected : Vehicle Program. ...

  7. Advances in flaw evaluation procedures and acceptance criteria for reactor piping

    International Nuclear Information System (INIS)

    Gamble, R.M.; Zahoor, A.; Norris, D.M.

    1986-01-01

    During the past several years, intergranular stress corrosion cracks (IGSCC) have been detected in stainless steel piping in boiling water reactors (BWRs) and have resulted in an increased number of flaw evaluations. To reduce the outage time associated with evaluating IGSCC, various research and ASME code groups have spent significant effort to provide utility personnel with efficient means to detect, classify, and size flaws, and to determine suitability for return to service for flawed stainless steel piping. One of the several nondestructive evaluation technologies that has received considerable attention is fracture mechanics, the discipline that considers the failure of flawed material. Fracture mechanics can be used to answer two key questions concerning return to service of flawed pipe: (a) what is the largest flaw size that can be returned to service and still maintain adequate safety margins at the applied loads, and (b) how much operating time remains before the crack reaches the largest allowable size? The purpose of this paper is to provide an overview of the recently developed ASME code Section XI flaw size evaluation procedure and acceptance criteria for stainless steel piping and their application by BWR owners to efficiently determine if flaws found by nondestructive examination are acceptable for continued service

  8. Advances in flaw evaluation procedures and acceptance criteria for reactor piping

    Energy Technology Data Exchange (ETDEWEB)

    Gamble, R.M.; Zahoor, A.; Norris, D.M.

    1986-01-01

    During the past several years, intergranular stress corrosion cracks (IGSCC) have been detected in stainless steel piping in boiling water reactors (BWRs) and have resulted in an increased number of flaw evaluations. To reduce the outage time associated with evaluating IGSCC, various research and ASME code groups have spent significant effort to provide utility personnel with efficient means to detect, classify, and size flaws, and to determine suitability for return to service for flawed stainless steel piping. One of the several nondestructive evaluation technologies that has received considerable attention is fracture mechanics, the discipline that considers the failure of flawed material. Fracture mechanics can be used to answer two key questions concerning return to service of flawed pipe: (a) what is the largest flaw size that can be returned to service and still maintain adequate safety margins at the applied loads, and (b) how much operating time remains before the crack reaches the largest allowable size. The purpose of this paper is to provide an overview of the recently developed ASME code Section XI flaw size evaluation procedure and acceptance criteria for stainless steel piping and their application by BWR owners to efficiently determine if flaws found by nondestructive examination are acceptable for continued service.

  9. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  10. Embedding Procedure Assistance into Mission Control Tools, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are the accepted means of commanding spacecraft. Procedures encode the operational knowledge of a system as derived from system experts, testing, training...

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis

  13. MCO combustible gas management leak test acceptance criteria; TOPICAL

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    1999-01-01

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10(sup -5) std cc/sec and 1 x 10(sup -7) std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations[within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL)

  14. Quality assurance methods and procedures for accepting radioactive waste for final storage

    International Nuclear Information System (INIS)

    Wenger, R.

    1992-01-01

    The concept of quality assurance for the final storage of radioactive materials is presented together with the procedure, characterisation, procedural development and documentation involved. Other topics include the assessment of the material to find its suitability for final storage and the tests for transport. 4 figs., 9 refs

  15. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  16. Acceptance test report for portable exhauster POR-008/Skid F

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document

  17. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1994-01-01

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified

  18. Fueled viking generator S/N 106 acceptance vibration test report

    International Nuclear Information System (INIS)

    Anderson, C.; Brewer, C.O.; Abrahamson, S.G.

    1976-01-01

    The Viking Generator S/N 106 was vibrated to the Teledyne Isotope Flight Acceptance Schedule (Random Only) with no deviation from normal generator functional output. Radiographic analysis and power tests before and after the vibration test indicated no change in the condition of the generator. The work was conducted in the Alpha Fuels Environmental Test Facility at Mound Laboratory

  19. 105 K East isolation barrier acceptance analysis report

    International Nuclear Information System (INIS)

    McCracken, K.J.; Irwin, J.J.

    1995-01-01

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c). A discussion of the leak rate analytical characterization (Irwin 1995) describes how the flow characteristics and the flow rate will be determined using the test data from the test report (McCracken 1995b). The barriers must adequately control the leakage from the main basin to the discharge chute to less than the 1,500 gph (5,680 lph) Safety Analysis Report (SAR 1994) limit

  20. Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

    Science.gov (United States)

    Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

  1. Operability test report for core sample truck number one flammable gas modifications

    International Nuclear Information System (INIS)

    Akers, J.C.

    1997-01-01

    This report primarily consists of the original test procedure used for the Operability Testing of the flammable gas modifications to Core Sample Truck No. One. Included are exceptions, resolutions, comments, and test results. This report consists of the original, completed, test procedure used for the Operability Testing of the flammable gas modifications to the Push Mode Core Sample Truck No. 1. Prior to the Acceptance/Operability test the truck No. 1 operations procedure (TO-080-503) was revised to be more consistent with the other core sample truck procedures and to include operational steps/instructions for the SR weather cover pressurization system. A draft copy of the operations procedure was used to perform the Operability Test Procedure (OTP). A Document Acceptance Review Form is included with this report (last page) indicating the draft status of the operations procedure during the OTP. During the OTP 11 test exceptions were encountered. Of these exceptions four were determined to affect Acceptance Criteria as listed in the OTP, Section 4.7 ACCEPTANCE CRITERIA

  2. Low acceptance of HSV-2 testing among high-risk women.

    Science.gov (United States)

    Roth, A M; Dodge, B M; Van Der Pol, B; Reece, M; Zimet, G D

    2011-06-01

    We evaluated the acceptability of a community-based herpes simplex virus type 2 (HSV-2) screening programme for at-risk women and assessed factors related to uptake of point of care HSV-2 testing. One hundred recently arrested women (median age 34 years) were recruited from a community court handling lower-level misdemeanour cases in Indianapolis, Indiana. Individuals completed a survey assessing factors related to HSV-2 screening intentions and were offered point of care HSV-2 testing. Rates of HSV-2 infection in this population are high; 61.1% of women tested were positive. The majority (81%) accepted a prescription for suppressive therapy. Women in this sample indicated that HSV-2 screening is an important component of health care but were unwilling to pay the US$10 it cost to be tested. To encourage this and other high-risk populations to be screened for HSV-2, public health resources will be needed to help individuals overcome cost-related barriers to care.

  3. Acceptance of HIV testing among women attending antenatal care in south-western Uganda: risk factors and reasons for test refusal.

    Science.gov (United States)

    Dahl, V; Mellhammar, L; Bajunirwe, F; Björkman, P

    2008-07-01

    A problem commonly encountered in programs for prevention of mother-to-child-transmission (PMTCT) of HIV in sub-Saharan Africa is low rates of HIV test acceptance among pregnant women. In this study, we examined risk factors and reasons for HIV test refusal among 432 women attending three antenatal care clinics offering PMTCT in urban and semi-urban parts of the Mbarara district, Uganda. Structured interviews were performed following pre-test counselling. Three-hundred-eighty women were included in the study, 323 (85%) of whom accepted HIV testing. In multivariate analysis, testing site (Site A: OR = 1.0; Site B: OR = 3.08; 95%CI: 1.12-8.46; Site C: OR = 5.93; 95%CI: 2.94-11.98), age between 30 and 34 years (refusal. Testing sites operating for longer durations had higher rates of acceptance. The most common reasons claimed for test refusal were: lack of access to antiretroviral therapy (ART) for HIV-infected women (88%; n=57), a need to discuss with partner before decision (82%; n=57) and fear of partner's reaction (54%; n=57). Comparison with previous periods showed that the acceptance rate increased with the duration of the program. Our study identified risk factors for HIV test refusal among pregnant women in Uganda and common reasons for not accepting testing. These findings may suggest modifications and improvements in the performance of HIV testing in this and similar populations.

  4. Cloud-based Electronic Test Procedures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Test procedures are at the heart of any experimental process, especially those involving novel and complex hardware. Whether these procedures are for system...

  5. Acceptance test for 900 MWe PWR unit replacement steam generators; Essai de reception des generateurs de vapeur de remplacement des tranches REP 900

    Energy Technology Data Exchange (ETDEWEB)

    Gourguechon, B.

    1993-12-31

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG`s differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs.

  6. Portal monitor evaluation and test procedure

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Rich, B.L.

    1983-10-01

    The purpose was to develop techniques and procedures to allow users to measure performance and sensitivity of portal monitors. Additionally, a methodology was developed to assist users in optimizing monitor performance. The two monitors tested utilized thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: a) background count rate and the statistical variability, b) detector efficiency at different distances, c) moving source sensitivity for various size sources and speeds, and d) false alarm rates at different background levels. A model was developed for the moving source measurements to compare the experimental data with measured results, and to test whether it is possible to adequately model the behavior of a portal monitor's response to a moving source. The model results were compared with the actual test results. A procedure for testing portal monitors is also given. 1 reference, 9 figures, 8 tables

  7. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1994-01-01

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area)

  8. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  9. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  10. 78 FR 38411 - Vogtle Electric Generating Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria

    Science.gov (United States)

    2013-06-26

    ... Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests...

  11. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  12. Acceptability of routine offer of HIV testing (opt-out approach) among ...

    African Journals Online (AJOL)

    Background: With the introduction of the opt out HIV testing policy in Ghana, the HIV test is offered routinely to all pregnant women unless they decline testing. Objective: To assess acceptability of the routine offer of HIV testing antenatal clinic (ANC) clients in the Wa municipality, Ghana. Design: Cross-sectional study of 270 ...

  13. Waste acceptance criteria study: Volume 2, Appendixes: Final report

    International Nuclear Information System (INIS)

    Johnson, E.R.; McLeod, N.B.; McBride, J.A.

    1988-09-01

    These appendices to the report on Waste Acceptance Criteria have been published as a separate volume for the convenience of the reader. They consist of the text of the 10CFR961 Contract for disposal of spent fuel, estimates of the cost (savings) to the DOE system of accepting different forms of spent fuel, estimates of costs of acceptance testing/inspection of spent fuel, illustrative specifications and procedures, and the resolution of comments received on a preliminary draft of the report. These estimates of costs contained herein preliminary and are intended only to demonstrate the trends in costs, the order of magnitude involved, and the methodology used to develop the costs. The illustrative specifications and procedures included herein have been developed for the purpose of providing a starting point for the development of a consensus on such matters between utilities and DOE

  14. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Science.gov (United States)

    2010-10-01

    ... acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under...

  15. Acceptance inspection plan 105KE Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified, to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  16. Acceptance inspection plan 105KW Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of.work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  17. Test performance and acceptability of self- versus provider-collected swabs for high-risk HPV DNA testing in female-to-male trans masculine patients.

    Science.gov (United States)

    Reisner, Sari L; Deutsch, Madeline B; Peitzmeier, Sarah M; White Hughto, Jaclyn M; Cavanaugh, Timothy P; Pardee, Dana J; McLean, Sarah A; Panther, Lori A; Gelman, Marcy; Mimiaga, Matthew J; Potter, Jennifer E

    2018-01-01

    High-risk human papillomavirus (hrHPV) causes virtually all cervical cancers. Trans masculine (TM) people (those assigned female at birth who identify with a gender other than female) have low uptake of conventional cervical cancer screening. Self-collected hrHPV DNA testing has high levels of acceptability among cisgender (non-transgender) females and may support increased cervical cancer screening uptake in TM individuals. To assess the test performance and acceptability of self-collected vaginal specimens in comparison to provider-collected cervical swabs for hrHPV DNA detection in TM individuals ages 21-64 years. Between March 2015-September 2016, 150 TM participants with a cervix (mean age = 27.5 years; SD = 5.7) completed a one-time study visit comprised of a self-report survey, self-collected vaginal HPV DNA swab, clinician-administered cervical HPV swab, and brief interview on acceptability of clinical procedures. Participants were randomized to complete either self- or provider-collection first to minimize ordering effects. Self- and provider-collected samples were tested for 13 hrHPV DNA types using a DNA Hybridization Assay. The primary outcome variable was the concordance (kappa statistic) and performance (sensitivity, specificity) of self-collected vaginal HPV DNA specimens versus provider-collected cervical HPV swabs as the gold standard. Of the 131 participants completing both the self- and provider-collected HPV tests, 21 cases of hrHPV were detected by the provider cervical swab (gold standard; 16.0% hrHPV prevalence); 15 of these cases were accurately detected by the self-collected vaginal swab (71.4% concordance) (Kappa = 0.75, 95% Confidence Interval [CI]: 0.59, 0.92; p<0.001). Compared to the provider-collected cervical hrHPV DNA sample (gold standard), the self-collected vaginal hrHPV DNA test demonstrated a sensitivity of 71.4% (95% CI: 0.52, 0.91; p = 0.0495) and specificity of 98.2% (95% CI: 0.96, 1.00; p<0.0001). Over 90% of participants

  18. Adolescent test or procedure preparation

    Science.gov (United States)

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older teens may benefit from videos that show adolescents of the same age explaining ...

  19. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  20. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  1. Optimized FFTF Acceptance Test Program covering Phases III, IV, and V

    International Nuclear Information System (INIS)

    Wykoff, W.R.; Jones, D.H.

    1977-03-01

    A detailed review of Phases III, IV, and V of the FFTF Acceptance Test Program has been completed. The purpose of this review was to formulate that test sequence which not only meets requirements for safe, reliable and useful operation of the plant, but also results in the earliest prudent demonstration of full-power performance. A test sequence based on the underlying assumption that sodium flows into the secondary sodium storage tank (T-44) no later than August 31, 1978, is described in detail. A time-scale which allows extra time to put systems and equipment into operation the first time, debugging, and learning how to operate most effectively has been superimposed on the test sequence. Time is not included for major equipment malfunctions. This test plan provides the basis for coordinating the many and varied activities and interfaces necessary for successful and timely execution of the FFTF Acceptance Test Program. In this report, the need dates have been identified for presently scheduled test articles and standard core components

  2. Test report - 241-AN-274 Caustic Pump Control Building

    International Nuclear Information System (INIS)

    Paintner, G.P.

    1995-05-01

    This Acceptance Test Report documents the test results of test procedure WHC-SD-WM-ATP-135 'Acceptance Test Procedure for the 241-AN- 274 Caustic Pump Control Building.' The objective of the test was to verify that the 241-AN-274 Caustic Pump Control Building functions properly based on design specifications per applicable H-2-85573 drawings and associated ECN's. The objective of the test was met

  3. An Application of Graphical Approach to Construct Multiple Testing Procedure in a Hypothetical Phase III Design

    Directory of Open Access Journals (Sweden)

    Naitee eTing

    2014-01-01

    Full Text Available Many multiple testing procedures (MTP have been developed in recent years. Among these new procedures, the graphical approach is flexible and easy to communicate with non-statisticians. A hypothetical Phase III clinical trial design is introduced in this manuscript to demonstrate how graphical approach can be applied in clinical product development. In this design, an active comparator is used. It is thought that this test drug under development could potentially be superior to this comparator. For comparison of efficacy, the primary endpoint is well established and widely accepted by regulatory agencies. However, an important secondary endpoint based on Phase II findings looks very promising. The target dose may have a good opportunity to deliver superiority to the comparator. Furthermore, a lower dose is included in case the target dose may demonstrate potential safety concerns. This Phase III study is designed as a non-inferiority trial with two doses, and two endpoints. This manuscript will illustrate how graphical approach is applied to this design in handling multiple testing issues.

  4. Acceptance testing and commissioning of a new model HDR afterloader

    International Nuclear Information System (INIS)

    McDermott, Patrick N.; Somnay, Archana R.; Alecu, Rodica

    1996-01-01

    We have recently performed acceptance testing procedures and have commissioned a new model HDR afterloader, the Varian VariSource with ''Intelligent Drive.'' Our site was one of the first installations worldwide. It is our intent to describe our tests and the results of the tests particularly as they may differ from other afterloaders. The Ir-192 source is unique among afterloaders marketed in the US in that it is very slender (OD of source wire is 0.59 mm) and relatively long (two 0.5 cm sources for a total active length of 1.0 cm). A check of source homogeneity by autoradiograph as urged by the US Nuclear Regulatory Commission demonstrates no detectable source inhomogeneity. Reentrant well ionization chambers are calibrated in the US with a 3.5 mm long source at Accredited Dosimetry Calibration Laboratories. Therefore calibration needs to be considered with some care. Calibration of the first delivered source with a well ionization chamber indicated agreement with the manufacturer's stated activity to within 0.5%. Source positioning is checked with a device called a 'cam scale'. Tests have been carried out on this system and it has been found to accurately indicate source position to within ±0.5 mm. Timer accuracy has been found to be better than 0.1% for dwell times of several hundred seconds. The intelligent drive system and the small source diameter allow the source wire to negotiate paths with small radius of curvature. A series of tests have been made in which the source is forced to negotiate 'U' turns of decreasing radius of curvature. A 4.7 F, 100 cm long catheter was used for these tests and the 'U' turn was positioned at approximately 90 cm. Under these conditions, the VariSource was consistently able to traverse a 1.25 cm radius of curvature, which is better than the manufacturer's stated limit of 1.5 cm

  5. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer's (OEM) specifications. This document reports the results of the testing

  6. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  7. On generalized fixed sequence procedures for controlling the FWER.

    Science.gov (United States)

    Qiu, Zhiying; Guo, Wenge; Lynch, Gavin

    2015-12-30

    Testing a sequence of pre-ordered hypotheses to decide which of these can be rejected or accepted while controlling the familywise error rate (FWER) is of importance in many scientific studies such as clinical trials. In this paper, we first introduce a generalized fixed sequence procedure whose critical values are defined by using a function of the numbers of rejections and acceptances, and which allows follow-up hypotheses to be tested even if some earlier hypotheses are not rejected. We then construct the least favorable configuration for this generalized fixed sequence procedure and present a sufficient condition for the FWER control under arbitrary dependence. Based on the condition, we develop three new generalized fixed sequence procedures controlling the FWER under arbitrary dependence. We also prove that each generalized fixed sequence procedure can be described as a specific closed testing procedure. Through simulation studies and a clinical trial example, we compare the power performance of these proposed procedures with those of the existing FWER controlling procedures. Finally, when the pairwise joint distributions of the true null p-values are known, we further improve these procedures by incorporating pairwise correlation information while maintaining the control of the FWER. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  8. Void fraction instrument software, Version 1,2, Acceptance test report

    International Nuclear Information System (INIS)

    Gimera, M.

    1995-01-01

    This provides the report for the void fraction instrument acceptance test software Version 1.2. The void fraction will collect data that will be used to calculate the quantity of gas trapped in waste tanks

  9. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion...

  10. SU-F-J-20: Commissioning and Acceptance Testing of the C-Rad CatalystHD Surface Imaging System

    International Nuclear Information System (INIS)

    Stanley, D; Rasmussen, K; Kirby, N; Papanikolaou, N; Gutierrez, A

    2016-01-01

    Introduction: With the increasing use of surface-based, nonionizing image-guided radiotherapy (IGRT) systems, a comprehensive set of clinical acceptance and commissioning procedures are needed to ensure correct functionality and proper clinical integration. Although TG-147 provides a specific set of parameters, measurement methodologies have yet to be described. The aim of this study was to provide a comprehensive overview of the commissioning and acceptance analysis performed for the C-Rad CatalystHD imaging system. Methods and Materials: Methodology for the commissioning and acceptance of the C-Rad CatalystHD imaging system was developed using commercially available clinical equipment. Following TG-147 guidelines, the following tests were performed: integration of peripheral equipment, system drift, static spatial reproducibility and localization accuracy, static end-to-end analysis, static rotational accuracy, dynamic spatial accuracy, dynamic temporal accuracy, dynamic radiation delivery and a comprehensive end-to-end analysis. Results: The field of view (FOV) of the CatalystHD was 105×109×83 cm3 in the lateral, longitudinal and vertical directions. For thermal equilibrium and system drift, a thermal drift of 1.0mm was noted. A 45 min warmup time is recommended if the system has been shut off an extended period of time (>24 hours) before the QA procedure to eliminate any thermal drift. Spatial reproducibility was found to be 0.05±0.03 mm using a rigid phantom. For the static localization accuracy, system agreement with couch shifts was within 0.1±0.1 mm and positioning agreement with kV-CBCT was 0.16±0.10 mm. For static rotational accuracy, system agreement with a high precision rotational stage (0.01 deg precision) was within 0.10±0.07 deg. Dynamic spatial and temporal localization accuracy was found to be within 0.2±0.1 mm. Conclusion: A comprehensive commissioning and acceptance study was performed using commercially available phantoms and in

  11. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00025; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  12. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  13. 16 CFR 1510.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedure. 1510.4 Section 1510.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS... plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  14. Testing of tubular goods - a critical review of past and actual testing procedures

    Energy Technology Data Exchange (ETDEWEB)

    Teodoriu, C. [Texas A and M Univ., Houston, TX (United States); Holzmann, J.; Klaws, M. [TU Clausthal (Germany). Inst. fuer Erdoel- und Erdgastechnik

    2007-09-13

    Testing of oil country tubular goods (OCTG) is based on standards and offers the user a comparison platform between products of different manufacturers. But, do the standard based testing procedures assume the real loads on OCTG? More likely, the existing standards or recommendations on tubular testing have been evolving together with the new demands on OCTG loading. Since nowadays the oil and gas industry is looking to develop extreme reservoir types (deep water, HP/HT), there is a need of a better understanding and continuous improvement of testing procedures. The following poster proposes an analysis of existing procedures to test tubular goods and then will focus on the future demands on OCTG testing. New loads, as casing fatigue, will be discussed and analyzed based on the authors experience gained during more than 8 years of testing tubular goods at the Clausthal University of Technology, Institute of Petroleum Engineering. (orig.)

  15. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  16. Community acceptability of use of rapid diagnostic tests for malaria by community health workers in Uganda

    Directory of Open Access Journals (Sweden)

    Waiswa Peter

    2010-07-01

    Full Text Available Abstract Background Many malarious countries plan to introduce artemisinin combination therapy (ACT at community level using community health workers (CHWs for treatment of uncomplicated malaria. Use of ACT with reliance on presumptive diagnosis may lead to excessive use, increased costs and rise of drug resistance. Use of rapid diagnostic tests (RDTs could address these challenges but only if the communities will accept their use by CHWs. This study assessed community acceptability of the use of RDTs by Ugandan CHWs, locally referred to as community medicine distributors (CMDs. Methods The study was conducted in Iganga district using 10 focus group discussions (FGDs with CMDs and caregivers of children under five years, and 10 key informant interviews (KIIs with health workers and community leaders. Pre-designed FGD and KII guides were used to collect data. Manifest content analysis was used to explore issues of trust and confidence in CMDs, stigma associated with drawing blood from children, community willingness for CMDs to use RDTs, and challenges anticipated to be faced by the CMDs. Results CMDs are trusted by their communities because of their commitment to voluntary service, access, and the perceived effectiveness of anti-malarial drugs they provide. Some community members expressed fear that the blood collected could be used for HIV testing, the procedure could infect children with HIV, and the blood samples could be used for witchcraft. Education level of CMDs is important in their acceptability by the community, who welcome the use of RDTs given that the CMDs are trained and supported. Anticipated challenges for CMDs included transport for patient follow-up and picking supplies, adults demanding to be tested, and caregivers insisting their children be treated instead of being referred. Conclusion Use of RDTs by CMDs is likely to be acceptable by community members given that CMDs are properly trained, and receive regular technical

  17. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  18. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  19. A review of acceptance testing of the Los Alamos, Canberra Alpha Sentry Continuous Air Monitor (CAM)

    International Nuclear Information System (INIS)

    Rodgers, J.C.

    1998-01-01

    Los Alamos National Laboratory (LANL) undertook the design and development of a new generation of alpha continuous air monitor (CAM) instrumentation that would incorporate advanced technologies in the design of the sampling inlet, multi-channel analyzer (MCA) electronics, solid state alpha detectors, radon background interference suppression, background interference compensation and based on spectral analysis, and microcomputer based data communication, processing, storage, and retrieval. The ANSI air monitoring instrument standards (Performance Specifications for Health Physics Instrumentation -- Occupational Airborne Radioactivity Monitoring Instrumentation, N42.17B) specify performance criteria and testing procedures for instruments and instrument systems designed to continuously sample and quantify airborne radioactivity in the workplace. Although the intent of the standard is to provide performance testing criteria for type testing, it is appropriate to evaluate the performance of a new instrument such as the Alpha Sentry against certain of these criteria for purposes of an acceptance test based on stated specifications and the Los Alamos CAM Requirements document. This report provides an overview of the results of these tests, as they pertain to instruments designed to detect alpha-emitting radionuclides in particulate form

  20. Feasibility and acceptability of workers' health surveillance for fire fighters.

    Science.gov (United States)

    Plat, Marie-Christine J; Frings-Dresen, Monique Hw; Sluiter, Judith K

    2011-09-01

    The objective of this study was to test the feasibility and acceptability of a new workers' health surveillance (WHS) for fire fighters in a Dutch pilot-implementation project. In three fire departments, between November 2007 and February 2009, feasibility was tested with respect to i) worker intent to change health and behavior; ii) the quality of instructions for testing teams; iii) the planned procedure in the field; and iv) future WHS organisation. Acceptability involved i) satisfaction with WHS and ii) verification of the job-specificity of the content of two physical tests of WHS. Fire fighters were surveyed after completing WHS, three testing teams were interviewed, and the content of the two tests was studied by experts. nearly all of the 275 fire fighters intended to improve their health when recommended by the occupational physician. The testing teams found the instructions to be clear, and they were mostly positive about the organisation of WHS. Acceptability: the fire fighters rated WHS at eight points (out of a maximum of ten). The experts also reached a consensus about the optimal job-specific content of the future functional physical tests. Overall, it is feasible and acceptable to implement WHS in a definitive form in the Dutch fire-fighting sector.

  1. Test procedure for boxed waste assay system

    International Nuclear Information System (INIS)

    Wachter, J.

    1994-01-01

    This document, prepared by Los Alamos National Laboratory's NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system's embedded operating and data reduction software

  2. KE basin recirculation/skimmer/IX systems restart acceptance test report

    International Nuclear Information System (INIS)

    Derosa, D.C.

    1996-01-01

    The 105 KE Basin Recirculation System and Skimmer Loop have been upgraded to provide the flexibility to run the Ion Exchange Modules on either system to support spent fuel removal for the Spent Nuclear Fuel Project. This Acceptance Test Report Provides the documentation of the leak Testing for the construction work associated with the IXM inlet and outlet piping, places the cartridge filters back in service and provides the functional testing of the IXM's on the recirculation and skimmer systems

  3. Waste retrieval sluicing system data acquisition system acceptance test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115

  4. Test procedure forms for sludge retrieval and packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides test procedure forms for sludge retrieval and packaging tests in the 305 Cold Test Facility. The completed and approved forms provide all descriptions, criteria and analysis to safely perform sludge equipment tests in the 305 Cold Test Facility

  5. Dissolution test for low-activity waste product acceptance

    International Nuclear Information System (INIS)

    Ebert, W. L.

    1998-01-01

    We have measured the mean and standard deviation of the solution concentrations of B, Na, and Si attained in replicate dissolution tests conducted at temperatures of 20, 40, and 70 C, for durations of 3 and 7 days, and at glass/water mass ratios of 1:10 and 1:1. These and other tests were conducted to evaluate the adequacy of the test methods specified in privatization contracts and to develop a data base that can be used to evaluate the reliability of reported results for tests performed on the waste products. Tests were conducted with a glass that we formulated to be similar to low-activity waste products that will be produced during the remediation of Hanford tank wastes. Statistical analyses indicated that, while the mean concentrations of B, Na, and Si were affected by the values of test parameters, the standard deviation of replicate tests was not. The precision of the tests was determined primarily by uncertainties in the analysis of the test solutions. Replicate measurements of other glass properties that must be reported for Hanford low-activity waste products were measured to evaluate the possible adoption of the glass used in these tests as a standard test material for the product acceptance process

  6. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  7. Current use and acceptability of novel diagnostic tests for active tuberculosis: a worldwide survey

    Directory of Open Access Journals (Sweden)

    Massimo Amicosante

    Full Text Available ABSTRACT Objective: To determine the current use and potential acceptance (by tuberculosis experts worldwide of novel rapid tests for the diagnosis of tuberculosis that are in line with World Health Organization target product profiles. Methods: A multilingual survey was disseminated online between July and November of 2016. Results: A total of 723 individuals from 114 countries responded to the survey. Smear microscopy was the most commonly used rapid tuberculosis test (available to 90.9% of the respondents, followed by molecular assays (available to 70.7%. Only a small proportion of the respondents in middle- and low-income countries had access to interferon-gamma-release assays. Serological and lateral flow immunoassays were used by more than a quarter (25.4% of the respondents. Among the respondents who had access to molecular tests, 46.7% were using the Xpert assay overall, that proportion being higher in lower middle-income countries (55.6% and low-income countries (76.6%. The data also suggest that there was some alignment of pricing for molecular assays. Respondents stated they would accept novel rapid tuberculosis tests if available, including molecular assays (acceptable to 86.0% or biomarker-based serological assays (acceptable to 81.7%. Simple biomarker-based assays were more commonly deemed acceptable in middle- and low-income countries. Conclusions: Second-generation molecular assays have become more widely available in high- and low-resource settings. However, the development of novel rapid tuberculosis tests continues to be considered important by tuberculosis experts. Our data also underscore the need for additional training and education of end users.

  8. Testing of the MFTF magnets

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chang, Y.; Dalder, E.N.C.

    1982-01-01

    This paper describes the cooldown and testing of the first yin-yang magnet for the Mirror Fusion Test Facility. The introduction describes the superconducting magnet; the rest of the paper explains the tests prior to and including magnet cooldown and final acceptance testing. The MFTF (originally MX) was proposed in 1976 and the project was funded for construction start in October 1977. Construction of the first large superconducting magnet set was completed in May 1981 and testing started shortly thereafter. The acceptance test procedures were reviewed in May 1981 and the cooldown and final acceptance test were done by the end of February 1982. During this acceptance testing the magnet achieved its full design current and field

  9. Specifications for Testing Procedures at Svåheia

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Kofoed, Jens Peter

    This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance.......This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance....

  10. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  11. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... procedures for electric motors to allow currently unregulated motors to be tested by clarifying the test...

  12. Factors associated with willingness to accept oral fluid HIV rapid testing among most-at-risk populations in China.

    Directory of Open Access Journals (Sweden)

    Huanmiao Xun

    Full Text Available The availability of oral fluid HIV rapid testing provides an approach that may have the potential to expand HIV testing in China, especially among most-a-risk populations. There are few investigations about the acceptability of oral fluid HIV testing among most-at-risk populations in China.A cross-sectional study with men who have sex with men (MSM, female sex workers (FSW and voluntary counseling and testing (VCT clients was conducted in three cities of Shandong province, China from 2011 to 2012. Data were collected by face-to-face questionnaire.About 71% of participants were willing to accept the oral fluid HIV rapid testing, and home HIV testing was independently associated with acceptability of the new testing method among MSM, FSW and VCT clients (AOR of 4.46, 3.19 and 5.74, respectively. Independent predictors of oral fluid HIV rapid testing acceptability among MSM were having ever taken an oral fluid HIV rapid test (AOR= 15.25, having ever taken an HIV test (AOR= 2.07, and education level (AOR= 1.74. Engagement in HIV-related risk behaviors (AOR= 1.68 was an independent predictor of acceptability for FSW. Having taken an HIV test (AOR= 2.85 was an independent predictor of acceptability for VCT clients. The primary concern about the oral fluid HIV testing was accuracy. The median price they would pay for the testing ranged from 4.8 to 8.1 U.S. dollars.High acceptability of oral fluid HIV rapid testing was shown among most-at-risk populations. Findings provide support for oral rapid HIV testing as another HIV prevention tool, and provide a backdrop for the implementation of HIV home testing in the near future. Appropriate pricing and increased public education through awareness campaigns that address concerns about the accuracy and safety of the oral fluid HIV rapid testing may help increase acceptability and use among most-at-risk populations in China.

  13. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  14. Retrofit and acceptance test of 30-cm ion thrusters

    Science.gov (United States)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  15. Acceptance Rate of HIV Testing among Women Seeking Induced ...

    African Journals Online (AJOL)

    A l\\'aide d\\'un questionnaire semi-structuré et auto-administré, nous avons interviewé 1051 femmes qui recherchaient l\\'avortement provoqué dans quatre cliniques selectionnées au hazard à Benin City entre janvier et septembre 2002. Les échantillons sanguins de celles qui ont accepté le test du VIH ont été collectés et ont ...

  16. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  17. Acceptance Sampling Plans Based on Truncated Life Tests for Sushila Distribution

    Directory of Open Access Journals (Sweden)

    Amer Ibrahim Al-Omari

    2018-03-01

    Full Text Available An acceptance sampling plan problem based on truncated life tests when the lifetime following a Sushila distribution is considered in this paper. For various acceptance numbers, confidence levels and values of the ratio between fixed experiment time and particular mean lifetime, the minimum sample sizes required to ascertain a specified mean life were found. The operating characteristic function values of the suggested sampling plans and the producer’s risk are presented. Some tables are provided and the results are illustrated by an example of a real data set.

  18. Acceptance test report for the 241-SY-101 Flexible Receiver Gamma Detector System

    International Nuclear Information System (INIS)

    Dowell, J.L.

    1995-01-01

    This Acceptance Test Report is for the 241-SY-101 Flexible Receiver Gamma Detector System. This test verified that the data logger and data converter for the gamma detector system functions as intended

  19. Agile Acceptance Test-Driven Development of Clinical Decision Support Advisories: Feasibility of Using Open Source Software.

    Science.gov (United States)

    Basit, Mujeeb A; Baldwin, Krystal L; Kannan, Vaishnavi; Flahaven, Emily L; Parks, Cassandra J; Ott, Jason M; Willett, Duwayne L

    2018-04-13

    Moving to electronic health records (EHRs) confers substantial benefits but risks unintended consequences. Modern EHRs consist of complex software code with extensive local configurability options, which can introduce defects. Defects in clinical decision support (CDS) tools are surprisingly common. Feasible approaches to prevent and detect defects in EHR configuration, including CDS tools, are needed. In complex software systems, use of test-driven development and automated regression testing promotes reliability. Test-driven development encourages modular, testable design and expanding regression test coverage. Automated regression test suites improve software quality, providing a "safety net" for future software modifications. Each automated acceptance test serves multiple purposes, as requirements (prior to build), acceptance testing (on completion of build), regression testing (once live), and "living" design documentation. Rapid-cycle development or "agile" methods are being successfully applied to CDS development. The agile practice of automated test-driven development is not widely adopted, perhaps because most EHR software code is vendor-developed. However, key CDS advisory configuration design decisions and rules stored in the EHR may prove amenable to automated testing as "executable requirements." We aimed to establish feasibility of acceptance test-driven development of clinical decision support advisories in a commonly used EHR, using an open source automated acceptance testing framework (FitNesse). Acceptance tests were initially constructed as spreadsheet tables to facilitate clinical review. Each table specified one aspect of the CDS advisory's expected behavior. Table contents were then imported into a test suite in FitNesse, which queried the EHR database to automate testing. Tests and corresponding CDS configuration were migrated together from the development environment to production, with tests becoming part of the production regression test

  20. 40 CFR 63.645 - Test methods and procedures for miscellaneous process vents.

    Science.gov (United States)

    2010-07-01

    ... analysis based on accepted chemical engineering principles, measurable process parameters, or physical or... for a new source, Method 18 may be used to determine any non-VOC hydrocarbons that may be deducted to calculate the TOC (minus non-VOC hydrocarbons) concentration and mass flow rate. The following procedures...

  1. Factors predicting the acceptance of herpes simplex virus type 2 antibody testing among adolescents and young adults.

    Science.gov (United States)

    Zimet, Gregory D; Rosenthal, Susan L; Fortenberry, J Dennis; Brady, Rebecca C; Tu, Wanzhu; Wu, Jingwei; Bernstein, David I; Stanberry, Lawrence R; Stone, Katherine M; Leichliter, Jami S; Fife, Kenneth H

    2004-11-01

    The rates and determinants of acceptance of herpes simplex virus type 2 (HSV-2) testing have not been adequately studied. The objective of this study was to identify factors associated with acceptance of HSV-2 antibody testing in individuals with no history of genital herpes. We conducted a cross-sectional survey study followed by the offer of free HSV-2 serologic testing at an urban sexually transmitted disease (STD) clinic, 2 general adult medical clinics, an urban university campus, and an urban adolescent medicine clinic. A total of 1199 individuals aged 14 to 30 years completed the survey and were offered testing. A total of 68.4% accepted HSV-2 testing. Factors independently associated with acceptance were female sex, older age, having an STD history, having 1 or more sexual partners in the last 6 months, perceived vulnerability to HSV-2 infection, and perceived benefits of HSV-2 testing. Fear of needles predicted rejection of testing, as did attending a general medical clinic versus an STD clinic and nonwhite race. There is a substantial interest in HSV-2 antibody testing across a variety of settings. Those at greatest behavioral and historic risk for HSV-2 infection, women, and persons whose health beliefs are consistent with testing are more likely to accept serologic testing when it is offered.

  2. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    Energy Technology Data Exchange (ETDEWEB)

    Burdin, J.R.

    1995-10-25

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  3. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    International Nuclear Information System (INIS)

    Burdin, J.R.

    1995-01-01

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  4. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  5. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  6. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  7. Acceptance test report MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This report documents the results the acceptance test HNF-4108 which verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, the alarms for the new emergency fan damper backup air compressor, and the generator sequencer logic

  8. 26. willingness to accept hiv testing among caretakers with a child

    African Journals Online (AJOL)

    Esem

    women and 11% of men have ever been tested for HIV. With all these efforts in place the .... important strategy in determining the gap in knowledge and its relationship with ... salary, education, and religion to be associated with accepting VCT ...

  9. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  10. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  11. A FLOW-THROUGH TESTING PROCEDURE WITH DUCKWEED (LEMNA MINOR L.)

    Science.gov (United States)

    Lemna minor is one of the smallest flowering plants. Because of its floating habit, ease of culture, and small size it is well adapted for laboratory investigations. Procedures for flow-through tests were developed. Testing procedures were developed with this apparatus. By using ...

  12. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    WERRY, S.M.

    2000-03-23

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  13. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    International Nuclear Information System (INIS)

    WERRY, S.M.

    2000-01-01

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151

  14. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  15. Quality assurance of radiopharmaceuticals-specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Pojer, P.M.

    1981-08-01

    This report is a compilation of test methods used and specifications adopted for the Radiopharmaceutical Quality Assurance Test Programme conducted by the Australian Radiation Laboratory. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods have been developed at the ARL

  16. Rein tension acceptance in young horses in a voluntary test situation.

    Science.gov (United States)

    Christensen, J W; Zharkikh, T L; Antoine, A; Malmkvist, J

    2011-03-01

    During riding, horses are frequently exposed to pressure from the rider, e.g. through the bit and reins, but few studies have investigated at which point rein tension becomes uncomfortable for the horse. To investigate how much rein tension young inexperienced horses are willing to accept in order to obtain a food reward; whether the tension acceptance changes during 3 consecutive test days; and whether rein tension correlates with the expression of conflict behaviour and heart rate. Pressure-naïve horses will apply only little rein tension in the first voluntary trial, but their acceptance will gradually increase. High levels of rein tension will lead to expression of conflict behaviour and increases in heart rate. Fifteen 2-year-old, bridle-naïve mares were encouraged to stretch their head forward (across a 0.95 m high metal bar) to obtain a food reward in a voluntary test situation. On each test day, each horse was exposed to 2 control sessions (loose reins), an intermediate and a short rein session (1 min/session). Rein tension, heart rate and behaviour were recorded. The horses applied significantly more tension on the first day (mean rein tension: 10.2 N), compared to the second and third test day (Day 2: 6.0 and Day 3: 5.7 N). The horses showed significantly more conflict behaviour in the short rein treatment. There was no treatment effect on heart rate. The horses applied the highest rein tension on the first day, and apparently learned to avoid the tension, rather than habituate to it. Rein tension correlated with expression of conflict behaviour, indicating that the horses found the tension aversive. Further studies should focus on the correlation between rein tension and conflict behaviour in ridden horses. © 2010 EVJ Ltd.

  17. Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2007-01-01

    1.1 These test methods provide procedures to determine the insulation resistance of a photovoltaic (PV) module, i.e. the electrical resistance between the module's internal electrical components and its exposed, electrically conductive, non-current carrying parts and surfaces. 1.2 The insulation integrity procedures are a combination of wet insulation resistance and wet dielectric voltage withstand test procedures. 1.3 These procedures are similar to and reference the insulation integrity test procedures described in Test Methods E 1462, with the difference being that the photovoltaic module under test is immersed in a wetting solution during the procedures. 1.4 These test methods do not establish pass or fail levels. The determination of acceptable or unacceptable results is beyond the scope of these test methods. 1.5 The values stated in SI units are to be regarded as the standard. 1.6 There is no similar or equivalent ISO standard. 1.7 This standard does not purport to address all of the safety conce...

  18. Rein tension acceptance in young horses in a voluntary test situation

    DEFF Research Database (Denmark)

    Christensen, Janne Winther; zharkikh, T.L.; Antoine, A.

    2011-01-01

    Reasons for performing the study: During riding, horses are frequently exposed to pressure from the rider, e.g. through the bit and reins, but few studies have investigated at which point rein tension becomes uncomfortable for the horse. Objectives: To investigate how much rein tension young...... inexperienced horses are willing to accept in order to obtain a food reward; whether the tension acceptance changes during 3 consecutive test days; and whether rein tension correlates with the expression of conflict behaviour and heart rate. Hypotheses: Pressure-naïve horses will apply only little rein tension...... in the first voluntary trial, but their acceptance will gradually increase. High levels of rein tension will lead to expression of conflict behaviour and increases in heart rate. Methods: Fifteen 2-year-old, bridle-naïve mares were encouraged to stretch their head forward (across a 0.95 m high metal bar...

  19. Establishment of a radiotherapy service with a linear accelerator (photons): acceptance tests, dosimetry and quality control

    International Nuclear Information System (INIS)

    Berdaky, Mafalda Feliciano

    2000-01-01

    This work presents the operational part of the final process of the establishment of a radiotherapy service with a linear accelerator (6 MeV photon beams), including the acceptance tests, commissioning tests and the implementation of a quality control program through routine mechanical and radiation tests. All acceptance tests were satisfactory, showing results below the allowed limits of the manufacturer, the commissioning tests presented results within those of the international recommendations. The quality control program was performed during 34 months and showed an excellent stability of this accelerator. (author)

  20. Evaluating outcomes of computer-based classroom testing: Student acceptance and impact on learning and exam performance.

    Science.gov (United States)

    Zheng, Meixun; Bender, Daniel

    2018-03-13

    Computer-based testing (CBT) has made progress in health sciences education. In 2015, the authors led implementation of a CBT system (ExamSoft) at a dental school in the U.S. Guided by the Technology Acceptance Model (TAM), the purposes of this study were to (a) examine dental students' acceptance of ExamSoft; (b) understand factors impacting acceptance; and (c) evaluate the impact of ExamSoft on students' learning and exam performance. Survey and focus group data revealed that ExamSoft was well accepted by students as a testing tool and acknowledged by most for its potential to support learning. Regression analyses showed that perceived ease of use and perceived usefulness of ExamSoft significantly predicted student acceptance. Prior CBT experience and computer skills did not significantly predict acceptance of ExamSoft. Students reported that ExamSoft promoted learning in the first program year, primarily through timely and rich feedback on examination performance. t-Tests yielded mixed results on whether students performed better on computerized or paper examinations. The study contributes to the literature on CBT and the application of the TAM model in health sciences education. Findings also suggest ways in which health sciences institutions can implement CBT to maximize its potential as an assessment and learning tool.

  1. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  2. Vehicle accelerated corrosion test procedures for automotive in Malaysia

    Directory of Open Access Journals (Sweden)

    Anuar Liza

    2017-01-01

    Full Text Available An accelerated corrosion test, known as proving ground accelerated test, is commonly performed by automotive manufacturers to evaluate the corrosion performance of a vehicle. The test combines corrosion and durability inputs to detect potential failures that may occur during in-service conditions. Currently, the test is conducted at an external test center overseas. Such test is aimed to simulate the effects of one year accelerated corrosion in severe corrosive environment of the north-east and south east of America. However, the test results obtained do not correlate with the actual corrosion conditions observed in the Malaysian market, which is likely attributed to the different test environment of the tropical climate of vehicles in service. Therefore, a vehicle accelerated corrosion test procedure that suits the Malaysian market is proposed and benchmarked with other global car manufacturers that have their own dedicated corrosion test procedure. In the present work, a test track is used as the corrosion test ground and consists of various types of roads for structural durability exposures. Corrosion related facilities like salt trough, mud trough and gravel road are constructed as addition to the existing facilities. The establishment of accelerated corrosion test facilities has contributed to the development of initial accelerated corrosion test procedure for the national car manufacturer. The corrosion exposure is monitored by fitting test coupons at the underbody of test vehicle using mass loss technique so that the desired corrosion rate capable of simulating the real time corrosion effects for its target market.

  3. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures and...

  4. Improving Acceptance, Integration, and Health Among LGBT Service Members

    Science.gov (United States)

    2017-10-01

    through multiple rounds of internal testing and quality assurance procedures. Recruitment for the Phase II survey was initiated on August 25, 2017...Award Numbers: W81XWH-15-1-0701 Title: Improving Acceptance, Integration, and Health Among LGBT Service Members Principal Investigators...burden to Department of Defense, Washington Headquarters Services , Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis

  5. Railcar waste transfer system hydrostatic test

    International Nuclear Information System (INIS)

    Ellingson, S.D.

    1997-01-01

    Recent modifications have been performed on the T-Plant Railcar Waste Transfer System, This Acceptance Test Procedure (ATP) has been prepared to demonstrate that identified piping welds and mechanical connections incorporated during the modification are of high integrity and are acceptable for service. This will be achieved by implementation of a hydrostatic leak test

  6. CANFLEX fuel bundle cross-flow endurance test 2 (test procedure)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Deok; Chung, C. H.; Chang, S. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    This report describes test procedure of cross-flow 2 test for CANFLEX fuel. In October 1996. a cross-flow test was successfully performed in the KAERI Hot Test Loop for four hours at a water flow rate of 31kg/s, temperature of 266 deg C and inlet pressure of 11MPa, but it is requested more extended time periods to determine a realistic operational margin for the CANFLEX bundle during abnormal refuelling operations. The test shall be conducted for twenty two hours under the reactor conditions. After an initial period of ten hours, the test shall be stopped at the intervals of four hours for bundle inspection and inspect the test bundle end-plate to end-cap welds for failure or crack propagation using liquid penetrant examination. 2 refs., 1 fig. (Author)

  7. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... device, the exhaust pipe must be the same diameter as found in-use for at least 4 pipe diameters upstream... Exhaust Test Procedures § 86.1327-96 Engine dynamometer test procedures; overview. (a) The engine.... The exhaust emissions are diluted with ambient air and a continuous proportional sample is collected...

  8. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and... (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... mode energy use of products that combine a microwave oven with other appliance functionality, as well...

  9. Acceptability of self-collected vaginal samples for HPV testing in an ...

    African Journals Online (AJOL)

    Objective: To evaluate the acceptability of self-collected vaginal samples for HPV testing in women living in rural and urban areas of Madagascar. Materials and methods: Participants were recruited in a health care center (urban group) and smaller affiliated dispensaries (rural group). They were invited to perform ...

  10. Development of an accelerated creep testing procedure for geosynthetics.

    Science.gov (United States)

    1997-09-01

    The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...

  11. Acceptance test plan for the Waste Information Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  12. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    Quality Assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. Computerized radiotherapy treatment planning systems (RTPSs) are now widely available in both industrialised and developing countries so, it is of special importance to support hospitals in the IAEA Member States in developing procedures for acceptance testing, commissioning and ongoing QA of their RTPSs. Responding to these needs, a group of experts developed a comprehensive report, the IAEA Technical Reports Series No 430 'Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer', that provides the general framework and describes a large number of tests and procedures to be considered by the RTPS users. To provide practical guidance for implementation of IAEA Technical Reports Series No. 430 in radiotherapy hospitals and particularly in those with limited resources, a coordinated research project (CRP E2.40.13) 'Development of procedures for dosimetry calculation in radiotherapy' was established. The main goal of the project was to create a set of practical acceptance and commissioning tests for dosimetry calculations in radiotherapy, defined in a dedicated protocol. Two specific guidance publications that were developed in the framework of the Coordinated Research Project E2.40.13 are based on guidelines described in the IAEA Technical Report Series No. 430 and provide a step-by-step description for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for their RTPSs. The first publication, 'Specification and acceptance testing of radiotherapy treatment planning systems' IAEA-TECDOC-1540 uses the International Electrotechnical Commission (IEC) standard IEC 62083 as its basis and addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and

  13. 702AZ aging waste ventilation facility year 2000 test procedure

    International Nuclear Information System (INIS)

    Winkelman, W.D.

    1998-01-01

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure

  14. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    International Nuclear Information System (INIS)

    Biyani, R.K.; Hendrickson, D.W.

    1997-01-01

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations

  15. 105 K east ion exchange and cartridge filter restart instrumentation acceptance test report

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1996-01-01

    Acceptance Test Report following the completion of ATP-012 for the 105KE CP-A and CP-A Computer and PLC Panels. The test was conducted from 11/13/95 to 12/11/95. Three test discrepancies were generated during the ATP and all were dispositioned and closed. All sections were completed except Section 5.9 which was deleted per ECN 190556

  16. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt's Hypotheses

    Science.gov (United States)

    Rulison, Kelly L.; Kreager, Derek A.; Osgood, D. Wayne

    2014-01-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent…

  17. MAC Version 3.3, MBA Version 1.3 acceptance test summary report

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Code Cleanup ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The Acceptance Test results indicate that the MAC and MBA systems are ready for operation using the cleaned up code. The final codes were removed to the production space on the customer server on April 15th

  18. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  19. Procedures for Selecting Items for Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1989-01-01

    Several classical approaches and alternative approaches to item selection for computerized adaptive testing (CAT) are reviewed and compared. The study also describes procedures for constrained CAT that may be added to classical item selection approaches to allow them to be used for applied testing. (TJH)

  20. New energy test procedures for refrigerators and other appliances; FINAL

    International Nuclear Information System (INIS)

    Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

    1999-01-01

    Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances

  1. The deformable secondary mirror of VLT: final electro-mechanical and optical acceptance test results

    Science.gov (United States)

    Briguglio, Runa; Biasi, Roberto; Xompero, Marco; Riccardi, Armando; Andrighettoni, Mario; Pescoller, Dietrich; Angerer, Gerald; Gallieni, Daniele; Vernet, Elise; Kolb, Johann; Arsenault, Robin; Madec, Pierre-Yves

    2014-07-01

    The Deformable Secondary Mirror (DSM) for the VLT ended the stand-alone electro-mechanical and optical acceptance process, entering the test phase as part of the Adaptive Optics Facility (AOF) at the ESO Headquarter (Garching). The VLT-DSM currently represents the most advanced already-built large-format deformable mirror with its 1170 voice-coil actuators and its internal metrology based on co-located capacitive sensors to control the shape of the 1.12m-diameter 2mm-thick convex shell. The present paper reports the final results of the electro-mechanical and optical characterization of the DSM executed in a collaborative effort by the DSM manufacturing companies (Microgate s.r.l. and A.D.S. International s.r.l.), INAF-Osservatorio Astrofisico di Arcetri and ESO. The electro-mechanical acceptance tests have been performed in the company premises and their main purpose was the dynamical characterization of the internal control loop response and the calibration of the system data that are needed for its optimization. The optical acceptance tests have been performed at ESO (Garching) using the ASSIST optical test facility. The main purpose of the tests are the characterization of the optical shell flattening residuals, the corresponding calibration of flattening commands, the optical calibration of the capacitive sensors and the optical calibration of the mirror influence functions.

  2. 40 CFR 53.43 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... sampling zone (see § 53.42(d)). To meet the maximum blockage limit of § 53.42(a) or for convenience, part... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind tunnel. Collect...

  3. Developing an acceptability assessment of preventive dental treatments.

    Science.gov (United States)

    Hyde, Susan; Gansky, Stuart A; Gonzalez-Vargas, Maria J; Husting, Sheila R; Cheng, Nancy F; Millstein, Susan G; Adams, Sally H

    2009-01-01

    Early childhood caries (ECC) is very prevalent among young Hispanic children. ECC is amenable to a variety of preventive procedures, yet many Hispanic families underutilize dental services. Acceptability research may assist in health care planning and resource allocation by identifying patient preferences among efficacious treatments with the goal of improving their utilization. The purposes of this study were (a) to develop a culturally competent acceptability assessment instrument, directed toward the caregivers of young Hispanic children, for five preventive dental treatments for ECC and (b) to test the instrument's reliability and validity. An instrument of five standard treatments known to prevent ECC was developed, translated, reviewed by focus groups, and pilot tested, then tested for reliability The instrument included illustrated cards, brief video clips, and samples of the treatments and was culturally appropriate for low-income Hispanic caregivers. In addition to determining the acceptability of the five treatments individually, the treatments were also presented as paired comparisons. Focus groups and debriefing interviews following the pilot tests established that the instrument has good face validity. The illustrated cards, product samples, and video demonstrations of the five treatments resulted in an instrument possessing good content validity. The instrument has good to excellent test-retest reliability, with identical time 1-time 2 responses for each of the five treatments 92 percent of the time (range 87 to 97 percent), and the same treatment of the paired comparisons preferred 75 percent of the time (range 61 to 90 percent). The acceptability instrument described is reliable and valid and may be useful in program planning efforts to identify and increase the utilization of preferred ECC preventive treatments for target populations.

  4. 40 CFR 600.111-08 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... § 600.109(b) while sampling the exhaust gas. (viii) Sampling must begin two seconds before beginning the... convenience of the user, the revised text is set forth as follows: § 600.111-08 Test procedures. (f) Special...

  5. Acceptance testing and quality assurance of Simulix evolution radiotherapy simulator

    International Nuclear Information System (INIS)

    Sinha, Ashutosh; Singh, Navin; Gurjar, Om Prakash; Bagdare, Priyusha

    2015-01-01

    The success of radiotherapy depends on precise treatment simulation and proper patient positioning. The simulator is a conventional radiographic and fluoroscopic system which emulates the geometrical positions of radiotherapy treatment unit. Hence, the acceptance tests and quality assurance (QA) of the simulator are important prior to its commissioning for the safe and precise clinical use. The verification of mechanical and optical readouts, field size, isocenter, optical and radiation field congruence were performed. The X-ray beam parameters were tested for kVp, mAs and consistency of radiation output. The flat panel detector performance was checked with respect to resolution, low contrast sensitivity (LCS), automatic dose rate control (ADRC), and gray image resolution (GIR). Gantry, table, and imaging system collision possibility was checked. Radiation survey around the room was also performed. The field size test for digital readout and on graph paper, the results of isocenter checkup for rotation of gantry, collimator, and couch, and the deviations observed in auto stop for various movements were found within the tolerance limits. Optical field and radiation field was found congruent. All the lasers were found aligned with the established isocenter. Maximum deviation for set and measured kV was found to be 3% in fluoro mode. The maximum deviation observed in mAs was 1.5% in 3-point as well as in 2-point film exposed mode. The X-ray output was found consistent. The results of tests for resolution, LCS, ADRC, and GIR of the flat panel detector were within tolerance limits. All the six safety interlocks were found working. Radiation level around the room was found within the acceptable limits. All the tests carried out were found within the tolerance limits. The data which has been taken in this study will provide basic support to the routine QA of the simulator. (author)

  6. Studies of field test procedures in hydraulic turbines for SHP; Estudos de procedimentos de ensaios de campo em turbinas hidraulicas para PCH

    Energy Technology Data Exchange (ETDEWEB)

    Justino, Lucimary Aparecida

    2006-07-01

    A supply contract of equipment for Small Hydro Power, contain the power and turbine efficiency guarantees and can contain adds guarantees referring to a rotation and pressure variation, runaway speed and cavitations test. To the determination about the hydraulics turbines performance for contractual guarantees are realized the field acceptance test, that are methods quite a lot used for enterprises like tools to prove the contractual guarantees in substitution to model test, that showed a cost extremely high. In the field acceptance test are measures of some values that added to the others, possibility obtain the turbine efficiency. In the small hydro power, the turbine efficiency represents the hydraulic power percentage that is subject to be transformed in electrical power. In the turbine purchase, the manufacturer has to guarantee the efficiency specified if it is become down to expected, the damages are enormous, then the importance to exist precise methods and reliable for your measurement. The method accuracy of the discharge measurement that has, between another problems, the calibration and installation, that influence hard the value of the efficiency obtained. This work shows the different methodologies about discharge measurement in hydraulic turbines, that can be apply in Small Hydro Power field tests and shows too the procedures used that in specifics cases of small hydro, without quality damage, the site tests could be executed the form that the guarantees will be approve with compatible cots with the investment done. As an example for said above, are show two cases in small hydro where did realized field acceptance tests to assure the contractual guarantees. (author)

  7. Multi-Canister Overpack (MCO) Combustible Gas Management Leak Test Acceptance Criteria (OCRWM)

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    2000-01-01

    The purpose of this document is to support the Spent Nuclear Fuel Project's combustible gas management strategy while avoiding the need to impose any requirements for oxygen free atmospheres within storage tubes that contain multi-canister overpacks (MCO). In order to avoid inerting requirements it is necessary to establish and confirm leak test acceptance criteria for mechanically sealed and weld sealed MCOs that are adequte to ensure that, in the unlikely event the leak test results for any MCO were to approach either of those criteria, it could still be handled and stored in stagnant air without compromising the SNF Project's overall strategy to prevent accumulation of combustible gas mixtures within MCOs or within their surroundings. To support that strategy, this document: (1) establishes combustible gas management functions and minimum functional requirements for the MCO's mechanical seals and closure weld(s); (2) establishes a maximum practical value for the minimum required initial MCO inert backfill gas pressure; and (3) based on items 1 and 2, establishes and confirms leak test acceptance criteria for the MCO's mechanical seal and final closure weld(s)

  8. Nurses' perceptions, acceptance, and use of a novel in-room pediatric ICU technology: testing an expanded technology acceptance model.

    Science.gov (United States)

    Holden, Richard J; Asan, Onur; Wozniak, Erica M; Flynn, Kathryn E; Scanlon, Matthew C

    2016-11-15

    The value of health information technology (IT) ultimately depends on end users accepting and appropriately using it for patient care. This study examined pediatric intensive care unit nurses' perceptions, acceptance, and use of a novel health IT, the Large Customizable Interactive Monitor. An expanded technology acceptance model was tested by applying stepwise linear regression to data from a standardized survey of 167 nurses. Nurses reported low-moderate ratings of the novel IT's ease of use and low to very low ratings of usefulness, social influence, and training. Perceived ease of use, usefulness for patient/family involvement, and usefulness for care delivery were associated with system satisfaction (R 2  = 70%). Perceived usefulness for care delivery and patient/family social influence were associated with intention to use the system (R 2  = 65%). Satisfaction and intention were associated with actual system use (R 2  = 51%). The findings have implications for research, design, implementation, and policies for nursing informatics, particularly novel nursing IT. Several changes are recommended to improve the design and implementation of the studied IT.

  9. Acceptability of rapid oral fluid HIV testing among male injection drug users in Taiwan, 1997 and 2007.

    Science.gov (United States)

    Lyu, Shu-Yu; Morisky, Donald E; Yeh, Ching-Ying; Twu, Shiing-Jer; Peng, Eugene Yu-Chang; Malow, Robert M

    2011-04-01

    Rapid oral fluid HIV testing (rapid oral testing) is in the process of being adapted in Taiwan and elsewhere given its advantages over prior HIV testing methods. To guide this process, we examined the acceptability of rapid oral testing at two time points (i.e., 1997 and 2007) among one of the highest risk populations, male injection drug users (IDUs). For this purpose, an anonymous self-administered survey was completed by HIV-negative IDUs involved in the criminal justice system in 1997 (N (1)=137 parolees) and 2007 (N (2)=106 prisoners). A social marketing model helped guide the design of our questionnaire to assess the acceptability of rapid oral testing. This included assessing a new product, across four marketing dimensions: product, price, promotion, and place. Results revealed that in both 1997 and 2007, over 90% indicated that rapid oral testing would be highly acceptable, particularly if the cost was under US$6, and that a pharmacy would be the most appropriate and accessible venue for selling the rapid oral testing kits. The vast majority of survey respondents believed that the cost of rapid oral testing should be federally subsidized and that television and newspaper advertisements would be the most effective media to advertise for rapid oral testing. Both the 1997 and 2007 surveys suggested that rapid oral HIV testing would be particularly accepted in Taiwan by IDUs after release from the criminal justice system.

  10. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  11. Dermal and inhalation acute toxic class methods: test procedures and biometric evaluations for the Globally Harmonized Classification System.

    Science.gov (United States)

    Holzhütter, H G; Genschow, E; Diener, W; Schlede, E

    2003-05-01

    The acute toxic class (ATC) methods were developed for determining LD(50)/LC(50) estimates of chemical substances with significantly fewer animals than needed when applying conventional LD(50)/LC(50) tests. The ATC methods are sequential stepwise procedures with fixed starting doses/concentrations and a maximum of six animals used per dose/concentration. The numbers of dead/moribund animals determine whether further testing is necessary or whether the test is terminated. In recent years we have developed classification procedures for the oral, dermal and inhalation routes of administration by using biometric methods. The biometric approach assumes a probit model for the mortality probability of a single animal and assigns the chemical to that toxicity class for which the best concordance is achieved between the statistically expected and the observed numbers of dead/moribund animals at the various steps of the test procedure. In previous publications we have demonstrated the validity of the biometric ATC methods on the basis of data obtained for the oral ATC method in two-animal ring studies with 15 participants from six countries. Although the test procedures and biometric evaluations for the dermal and inhalation ATC methods have already been published, there was a need for an adaptation of the classification schemes to the starting doses/concentrations of the Globally Harmonized Classification System (GHS) recently adopted by the Organization for Economic Co-operation and Development (OECD). Here we present the biometric evaluation of the dermal and inhalation ATC methods for the starting doses/concentrations of the GHS and of some other international classification systems still in use. We have developed new test procedures and decision rules for the dermal and inhalation ATC methods, which require significantly fewer animals to provide predictions of toxicity classes, that are equally good or even better than those achieved by using the conventional LD(50)/LC

  12. CEL Working procedures for WRAP 2A formulation development test

    International Nuclear Information System (INIS)

    Duchsherer, M.J.

    1994-01-01

    The WRAP 2A facility will encapsulate retrieved, stored, and newly generated contact-handled mixed low level waste (MLLW) into 55-500 gal cementitous forms. Standardized test procedures will be required to facilitate this process. Cementitous specimens will be prepared from simulated drum wastes and will be tested in the Chemical Engineering Laboratory using the laboratory operating/working procedures encorporated into this document

  13. In acceptance we trust? Conceptualising acceptance as a viable approach to NGO security management.

    Science.gov (United States)

    Fast, Larissa A; Freeman, C Faith; O'Neill, Michael; Rowley, Elizabeth

    2013-04-01

    This paper documents current understanding of acceptance as a security management approach and explores issues and challenges non-governmental organisations (NGOs) confront when implementing an acceptance approach to security management. It argues that the failure of organisations to systematise and clearly articulate acceptance as a distinct security management approach and a lack of organisational policies and procedures concerning acceptance hinder its efficacy as a security management approach. The paper identifies key and cross-cutting components of acceptance that are critical to its effective implementation in order to advance a comprehensive and systematic concept of acceptance. The key components of acceptance illustrate how organisational and staff functions affect positively or negatively an organisation's acceptance, and include: an organisation's principles and mission, communications, negotiation, programming, relationships and networks, stakeholder and context analysis, staffing, and image. The paper contends that acceptance is linked not only to good programming, but also to overall organisational management and structures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.

  14. Acceptance and Divergence from Engineering Design Procedures Implicating Knowledge Flow

    DEFF Research Database (Denmark)

    Jensen, Ole Kjeldal; Ahmed, Saeema

    2009-01-01

    of explicit procedures and; 3) implicit procedures supporting needs that are not catered for by the explicit procedures. In this understanding, a procedure can be any kind of method, tool or framework used to support design engineers. Furthermore, the study discusses a variety of recommended actions......When developing procedures such as tools, methods and frameworks to support the development of new products, one of the challenges is ensuring their successful implementation. This paper describes a study of the development and use of such design-procedures with primary focus on the new product...

  15. Consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices

    International Nuclear Information System (INIS)

    Shi Peixin; Lin Yin

    2001-01-01

    Establishment of irradiation processing parameters, a quality assurance system, consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices were the activities carried out in this project by the Chinese Agricultural Irradiation Center. The results of the studies showed that the process dose for rice was 0.2-0.5 kGy when the non-uniformity was lower than 2.5, dose range for dehydrated vegetables was 5-7 kGy, dose for spices was 7-8 kGy. The system for quality assurance was established. The processing standards for several irradiated food items were set up. Market test showed that more than 70-80% of consumers accepted irradiated food. Industrial companies also accepted irradiated dehydrated vegetables and spices. The latter were successfully introduced to the markets and successful commercialization of irradiated garlic was followed. The economic benefit of operating the Chinese Agricultural Irradiation Center was analyzed and found attractive, especially for low dose irradiation of foods in sufficient supply. (author)

  16. Consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices

    Energy Technology Data Exchange (ETDEWEB)

    Peixin, Shi; Yin, Lin [Chinese Agricultural Irradiation Center, Institute for Application of Atomic Energy, Chinese Academy of Agricultural Sciences, Beijing (China)

    2001-05-01

    Establishment of irradiation processing parameters, a quality assurance system, consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices were the activities carried out in this project by the Chinese Agricultural Irradiation Center. The results of the studies showed that the process dose for rice was 0.2-0.5 kGy when the non-uniformity was lower than 2.5, dose range for dehydrated vegetables was 5-7 kGy, dose for spices was 7-8 kGy. The system for quality assurance was established. The processing standards for several irradiated food items were set up. Market test showed that more than 70-80% of consumers accepted irradiated food. Industrial companies also accepted irradiated dehydrated vegetables and spices. The latter were successfully introduced to the markets and successful commercialization of irradiated garlic was followed. The economic benefit of operating the Chinese Agricultural Irradiation Center was analyzed and found attractive, especially for low dose irradiation of foods in sufficient supply. (author)

  17. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax... displacement (compression) relative to the spine, measured with the chest deflection transducer (SA-572-S50...

  18. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  19. Vacuum Acceptance Tests for the UHV Room Temperature Vacuum System of the LHC during LS1

    CERN Document Server

    Cattenoz, G; Bregliozzi, G; Calegari, D; Gallagher, J; Marraffa, A; Chiggiato, P

    2014-01-01

    During the CERN Large Hadron Collider (LHC) first long shut down (LS1), a large number of vacuum tests are carried out on consolidated or newly fabricated devices. In such a way, the vacuum compatibility is assessed before installation in the UHV system of the LHC. According to the equipment’s nature, the vacuum acceptance tests consist in functional checks, leak test, outgassing rate measurements, evaluation of contaminants by Residual Gas Analysis (RGA), pumping speed measurements and qualification of the H2 sticking probability of Non-Evaporable-Getter (NEG) coating. In this paper, the methods used for the tests and the acceptance criteria are described. A summary of the measured vacuum characteristics for the tested components is also given.

  20. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... September 14, 1977. 42 FR 46140. Industry representatives viewed these test procedures as too complex and... Freezers'' (HRF-1- 1979). Using this industry-created test procedure, DOE revised its test procedures on... compartment of such a product to be at a level that would effectively exclude the coverage of combination wine...

  1. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the... energy use of products that combine a microwave oven with other appliance functionality, as well as minor...

  2. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  3. Determinants of the Acceptance of Sustainable Production Strategies among Dairy Farmers: Development and Testing of a Modified Technology Acceptance Model

    Directory of Open Access Journals (Sweden)

    Simona Naspetti

    2017-10-01

    Full Text Available An extended version of the Technology Acceptance Model (TAM was applied by means of Structural Equation Modelling to testing various hypotheses on attitudes and intentions of dairy farmers towards three novel sustainable production strategies, as well as the influence of organic practices and collaborative behaviours, such as information sharing with supply-chain partners. Data on the acceptance of three sustainable production strategies, namely ‘Agro-forestry’, ‘Alternative protein source’, and ‘Prolonged maternal feeding’ were collected by a survey of dairy farmers in six European Union (EU countries (Austria, Belgium, Denmark, Finland, Italy, United Kingdom. We found that perceived usefulness is the key determinant of acceptance, while the intention to adopt a sustainable production strategy may derive from the influence of opinions (and behaviours of relevant others (e.g., leading dairy farmers, family members, advisors showing the role of interactions among farmers and other stakeholders in the adoption of innovations. Finally, the perceived usefulness of all of the investigated strategies is higher for organic farmers, while collaborative patterns reduce the impact of subjective norm on usefulness and overall acceptance. Our findings should encourage policy makers to consider the important role of supply chain management practices, including collaboration, to enhance the sustainability of dairy farming systems.

  4. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  5. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  6. Philips Gemini TF64 PET/CT Acceptance Testing

    International Nuclear Information System (INIS)

    González Gonzalez, Joaquín J.; Calderón Marin, Carlos F.; Varela Corona, Consuelo; Machado Tejeda, Adalberto; González Correa, Héctor J.

    2016-01-01

    The Philips Gemini TF64 is the first PET/CT scanner installed in Cuba at the Institute of Oncology and Radiobiology in 2014. It is a third generation fully tridimensional whole body PET scanner with time-of-flight (TOF) technology combined with a 64-slice Brilliance CT scanner. The CT detector module contains 672x64 solid state detector, incorporating GOS scintillators, optical diodes and electronic signal channels arranged in 64 side by side arcs, with 672 detectors in each arc. There are sixteen 0.75 mm individual detector elements around the center and four 1.5 mm elements at each end, resulting in a 24 mm total detection length. The PET detector consists of 28 pixelar modules of a 23x44 array of 4x4x22 mm3 of LYSO crystals arranged in an Anger-logic detector design. The hardware coincidence-timing window for this scanner is set at 4 ns and delayed coincidence window technique is used to estimate the random coincidences in collected data. In this study the performance characteristics of PET/CT scanner were measured as part of the program tests of acceptance for clinical use.Methodology. The performance characteristics of CT scanner were evaluated by manufacturer protocol using Philips system performance phantom. Some additional geometrical tests were performed by the user. The intrinsic measurements of energy resolution as well as timing resolution, which define the TOF performance of PET scanner, were performed following the recommendations of manufacturer using 18 F. Spatial resolution, sensitivity, scatter fraction, counting rate performance, image quality and accuracy were measured according to the NEMA NU-2 2007 procedures. Additionally, to characterize the effect of TOF reconstruction on lesion contrast and noise, the standard NEMA torso phantom was reconstructed with and without TOF capability. The accuracy of PET/CT image registration was tested according to the manufacturer protocol using an image alignment calibration holder with 6 point sources of 22

  7. Electricity supply between acceptance, acceptability and social compatibility; Energieversorgung zwischen Akzeptanz, Akzeptabilitaet und Sozialvertraeglichkeit

    Energy Technology Data Exchange (ETDEWEB)

    Schubert, Katharina; Koch, Marco K. [Bochum Univ. (Germany). Lehrstuhl Energiesysteme und Energiewirtschaft (LEE)

    2012-11-01

    Acceptance promotion is supposed to be an indispensable premise for a successful realization of an energy concept. The contribution identifies deficiencies of the energy policy, including intransparency, complexity of decision procedures, for instance in case of the so called energy transmission line extension acceleration law, that has caused irritation and anger in the public. The justification of acceptance promotion is questioned in connection with the German nuclear policy reversal following the Fukushima accident. A research program ''public acceptance of large-scale power plants for electricity generation'' is presented. The issues criteria and limits of acceptability are of main importance for this discussion.

  8. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a... specified in 49 CFR 572.124(c): (1) The maximum sternum displacement relative to the spine, measured with...

  9. The influence of different measurement structures on NRTA test procedures

    International Nuclear Information System (INIS)

    Beedgen, R.

    1986-01-01

    The development of sequential statistical test procedures in the area of near real time material accountancy (NRTA) mostly assumed a fixed measurement model of a given model facility. In this paper different measurement models (dispersion matrices) for a sequence of balance periods are studied. They are used to compare the detection probabilities of three different sequential test procedures for losses of material. It is shown how different plant models have an influence on the sensitivity of specified tests. Great importance for that analysis have the optimal loss patterns in each measurement situation

  10. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  11. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  12. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  13. Operational test report for LERF Basin 242AL-44 integrity test

    International Nuclear Information System (INIS)

    Galioto, T.M.

    1994-01-01

    This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ''LERF Basin Integrity Testing.'' The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ''Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.'' WHC-S-086, ''Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,'' identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C

  14. Integrating Telemedicine for Disaster Response: Testing the Emergency Telemedicine Technology Acceptance Model

    Science.gov (United States)

    Davis, Theresa M.

    2013-01-01

    Background: There is little evidence that technology acceptance is well understood in healthcare. The hospital environment is complex and dynamic creating a challenge when new technology is introduced because it impacts current processes and workflows which can significantly affect patient care delivery and outcomes. This study tested the effect…

  15. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission

  16. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission

  17. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  18. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...... for a monopile testing was provided by Thomassen (2015a), procedure for monopile testing can be found in Thomassen (2015b), while safety instructions were given by Vaitkunaite et al. (2014)....

  19. Acceptability of Sexually Transmitted Infection Testing Using Self-Collected Vaginal Swabs among College Women

    Science.gov (United States)

    Fielder, Robyn L.; Carey, Kate B.; Carey, Michael P.

    2013-01-01

    Objective: To assess the acceptability of sexually transmitted infection (STI) testing using self-collected vaginal swabs (SCVS) among college women. Participants: First-year female students ("N" = 483). Methods: Participants were offered free testing for 3 STIs using SCVS in April 2010 and later completed a survey regarding their…

  20. Computer-facilitated rapid HIV testing in emergency care settings: provider and patient usability and acceptability.

    Science.gov (United States)

    Spielberg, Freya; Kurth, Ann E; Severynen, Anneleen; Hsieh, Yu-Hsiang; Moring-Parris, Daniel; Mackenzie, Sara; Rothman, Richard

    2011-06-01

    Providers in emergency care settings (ECSs) often face barriers to expanded HIV testing. We undertook formative research to understand the potential utility of a computer tool, "CARE," to facilitate rapid HIV testing in ECSs. Computer tool usability and acceptability were assessed among 35 adult patients, and provider focus groups were held, in two ECSs in Washington State and Maryland. The computer tool was usable by patients of varying computer literacy. Patients appreciated the tool's privacy and lack of judgment and their ability to reflect on HIV risks and create risk reduction plans. Staff voiced concerns regarding ECS-based HIV testing generally, including resources for follow-up of newly diagnosed people. Computer-delivered HIV testing support was acceptable and usable among low-literacy populations in two ECSs. Such tools may help circumvent some practical barriers associated with routine HIV testing in busy settings though linkages to care will still be needed.

  1. Topographical mapping system for radiological and hazardous environments acceptance testing

    International Nuclear Information System (INIS)

    Armstrong, G.A.; Dochat, G.R.

    1997-01-01

    During the summer of 1996, the Topographical Mapping System (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the Interactive Computer-Enhanced Remote-Viewing System (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and ICERVS was initiated by the US Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention

  2. Topographical mapping system for radiological and hazardous environments acceptance testing

    Science.gov (United States)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  3. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  4. W-087 Operational test report. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks. The equipment to be tested includes the following: a. Leak detection system operation and controls. b. Electrical interlocks.- C. Transfer pump oper ation. d. Vacuum breaker system interlocks.

  5. Who accepts a rapid HIV antibody test? The role of race/ethnicity and HIV risk behavior among community adolescents.

    Science.gov (United States)

    Swenson, Rebecca R; Hadley, Wendy S; Houck, Christopher D; Dance, S Kwame; Brown, Larry K

    2011-05-01

    Centers for Disease Control and Prevention guidelines recommend routine human immunodeficiency virus (HIV) screening in health care settings for all individuals aged 13-64 years; however, overall testing rates among adolescents still continue to remain low. This study examined factors related to the acceptance of HIV testing among an at-risk sample of ethnically/racially diverse community adolescents. Adolescents aged 15-21 (N = 81) years were recruited from community-based youth organizations to complete HIV risk assessment surveys. After the completion of the survey, participants were offered a free OraQuick rapid HIV antibody test. More than half (53.1%) of the participants accepted the test, with the black population being more likely to accept testing as compared to Latinos (75% vs. 39%). After controlling for race/ethnicity, significant predictors of test acceptance included history of sexual intercourse (OR = 5.43), having only one sexual partner in the past 3 months (OR = 4.88), not always using a condom with a serious partner (OR = 3.94), and not using a condom during last sexual encounter (OR = 4.75). Given that many adolescents are willing to know their HIV status, policies that support free or low-cost routine testing may lead to higher rates of case identification among youth. However, approaches must be developed to increase test acceptance among Latino adolescents and teenagers with multiple sexual partners. Copyright © 2011 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  6. Quality assurance in diagnostic radiology in Hungary - first experiences in acceptance testing

    International Nuclear Information System (INIS)

    Porubszky, T.; Pellet, S.; Ballay, L.; Talian, L.; Giczi, F.

    2003-01-01

    It is a general experience that optimum imaging with minimum patient doses, moreover, the safe operation and long life of X-ray equipment can be assured by regular measurement of technical parameters and checking of their constancy (routine performance testing) only. These tests are generally known as quality control, while together with the so-called corrective actions and its management it is called (physical-technical) quality assurance (QA). In the European Union, Directive 97/43/EURATOM about radiation protection of patients requires - among others - the good practice of (physical-technical) quality assurance. In Hungary, Decree No. 31/2001. (X.3.) of the Minister of Health harmonizes all of its requirements. Acceptance testing of new diagnostic X-ray equipment is assigned to NPHC-NRIRR. QA has been a daily practice in radiation therapy and nuclear medicine for a long time. A National Patient Dose Assessment Programme has also successfully run since 1989. We had, however, only few preliminaries in QA in diagnostic radiology in the second half of the eighties. Nowadays there are running QA programmes in some hospitals and mammography centres. he testing activity of our institute is independent from manufacturers, it is run within the frame of an accredited testing laboratory, using calibrated measuring instruments and based on valid international standards. So the started way of implementing QA in diagnostic radiology needs a lot of further efforts, adapting experiences of other countries, and also some financial help to reach an acceptable level in the EU. (authors)

  7. Characteristics of Mobile Payment Procedures

    OpenAIRE

    Kreyer, Nina; Pousttchi, Key; Turowski, Klaus

    2002-01-01

    Companies are not going to invest into the development of innovative applications or services unless these can be charged for appropriately. Thus, the existence of standardized and widely accepted mobile payment procedures is crucial for successful business-to-customer mobile commerce. The acceptance of mobile payment procedures depends on costs, security and convenience issues. For the latter, it is important that a procedure can be used over the different payment scenarios mobile commerce, ...

  8. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion. 1209.7 Section 1209.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY... for smoldering combustion. This section provides the test method for determining smoldering combustion...

  9. Acceptability of using electronic vending machines to deliver oral rapid HIV self-testing kits: a qualitative study.

    Directory of Open Access Journals (Sweden)

    Sean D Young

    Full Text Available Rates of unrecognized HIV infection are significantly higher among Latino and Black men who have sex with men (MSM. Policy makers have proposed that HIV self-testing kits and new methods for delivering self-testing could improve testing uptake among minority MSM. This study sought to conduct qualitative assessments with MSM of color to determine the acceptability of using electronic vending machines to dispense HIV self-testing kits.African American and Latino MSM were recruited using a participant pool from an existing HIV prevention trial on Facebook. If participants expressed interest in using a vending machine to receive an HIV self-testing kit, they were emailed a 4-digit personal identification number (PIN code to retrieve the test from the machine. We followed up with those who had tested to assess their willingness to participate in an interview about their experience.Twelve kits were dispensed and 8 interviews were conducted. In general, participants expressed that the vending machine was an acceptable HIV test delivery method due to its novelty and convenience.Acceptability of this delivery model for HIV testing kits was closely associated with three main factors: credibility, confidentiality, and convenience. Future research is needed to address issues, such as user-induced errors and costs, before scaling up the dispensing method.

  10. Acceptability of using electronic vending machines to deliver oral rapid HIV self-testing kits: a qualitative study.

    Science.gov (United States)

    Young, Sean D; Daniels, Joseph; Chiu, ChingChe J; Bolan, Robert K; Flynn, Risa P; Kwok, Justin; Klausner, Jeffrey D

    2014-01-01

    Rates of unrecognized HIV infection are significantly higher among Latino and Black men who have sex with men (MSM). Policy makers have proposed that HIV self-testing kits and new methods for delivering self-testing could improve testing uptake among minority MSM. This study sought to conduct qualitative assessments with MSM of color to determine the acceptability of using electronic vending machines to dispense HIV self-testing kits. African American and Latino MSM were recruited using a participant pool from an existing HIV prevention trial on Facebook. If participants expressed interest in using a vending machine to receive an HIV self-testing kit, they were emailed a 4-digit personal identification number (PIN) code to retrieve the test from the machine. We followed up with those who had tested to assess their willingness to participate in an interview about their experience. Twelve kits were dispensed and 8 interviews were conducted. In general, participants expressed that the vending machine was an acceptable HIV test delivery method due to its novelty and convenience. Acceptability of this delivery model for HIV testing kits was closely associated with three main factors: credibility, confidentiality, and convenience. Future research is needed to address issues, such as user-induced errors and costs, before scaling up the dispensing method.

  11. The effect of lubricating oils on bearing fatigue-life using the Evonik RohMax pitting test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Bartels, Thorsten [Evonik RohMax Additives GmbH, Darmstadt (Germany)

    2009-07-01

    A major requirement for modern driveline lubricants is the need to reduce churning losses and friction in order to deliver continual improvements in fuel efficiency. In trying to achieve this oil formulators target lower and lower viscosities, testing the limits of what is acceptable Churning loss reductions are being made by reducing the viscosity of the lubricating oil. Reduced oil viscosities can lead to reduced oil film thicknesses, especially at high operating temperatures. Thinner oil films can lead to an increase in friction, and a decrease in the fatigue-life capacity in lubricated contacts of bearings and gears in several driveline applications. Extensive fluid testing is required. Current test procedures are subject to extremely high variability, and large numbers of experiments are required to develop high confidence in the test conclusions. This publication introduces a new fatigue-life test method, which in our hands provides a clear improvement in test time, cost, and reproducibility. The test's results enable an estimation of the effect of lubricating oils on bearing fatigue-life. This is done by comparing the results to those obtained with reference oils which have also been tested in the standardized bearing tests for lubricating oils. The effects of operating parameters on test accuracy and repeatability have been studied. The parameters studied are oil temperature, contact pressure, speed and the test specimen batch. In addition to the measurement of bearing fatigue-life, the new test may also be used to study gear fatigue-life. We have used this test to investigate the lubrication oils' influence on fatigue-life in bearings and in gears. In order to extend the comparisons to gear performance the reference fluids were evaluated in standard industry test procedures used for determining gear performance, in particular the FZG test rig, thus establishing an extra insight in the fluids' performance by comparing gear test performance

  12. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  13. System acceptance and operability test report for the RMCS exhauster C on flammable gas tanks

    International Nuclear Information System (INIS)

    Waldo, E.J.

    1998-01-01

    This test report documents the completion of acceptance and operability testing of the rotary mode core sampling (RMCS) exhauster C, as modified for use as a major stack (as defined by the Washington State Department of Health) on flammable gas tanks

  14. Acceptability of study procedures (self-collected introital swabs, blood draws and stool sample collection) by students 10-16 years for an HPV vaccine effectiveness study: a pilot study.

    Science.gov (United States)

    Nakalembe, Miriam; Mutyaba, Twaha; Mirembe, Florence

    2016-03-16

    A cohort study was planned to evaluate vaccine immunogenicity and effect of malaria and helminth co-infections on the bivalent Human papilloma virus (HPV) vaccine. The study would involve self collected introital swabs, blood draws and stool sample collection. We therefore conducted a pilot study to assess the acceptability of these procedures among the students and their parents. A cross-sectional study among forty four students from two purposively selected primary schools of Western Uganda. Exit interviews and two focus group discussions (FGD) (for parents) were conducted. Acceptability was measured by willingness to undergo the procedures again, recommending the procedures to others as well as proportion of introital swabs positive for β globulin. FGD determined acceptability of the parents and explored opinions and perceptions that would influence their decisions. HPV-16/18 and β globulin deoxyribonucleic acid (DNA) were analysed using a polymerase chain reaction (PCR) kit. All the students (100%) in the study were willing to provide a self- collected introital swab and a stool sample as well as recommending their friends while (86.3%) were willing for blood draws. There were 40/44 (90.1%) self collected introital swabs that had positive result for human β globulin though none of them was positive for HPV-16/18. In the FGD, it emerged that parents concerns were on the blood draws and introital swab collection which were addressed. The study procedures were highly acceptable among this study population of students and their parents. Follow-up to assess HPV vaccine effectiveness and factors that may influence the vaccine in this age group is feasible.

  15. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  16. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF ENERGY [Docket Number EERE-2011-BT-TP-0041] RIN 1904-AC50 Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires) AGENCY: Office of Energy Efficiency and Renewable... (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires...

  17. The design, effectiveness and acceptability of the arm sleeve for the prevention of body fluid contamination during obstetric procedures.

    Science.gov (United States)

    Kabukoba, J J; Pearce, J M

    1993-08-01

    1. To design a device that would reduce contamination of staff during obstetric procedures. 2. To undertake clinical trials to assess the effectiveness and acceptability of such a device. A prospective study. The arm sleeve is made of a nonwoven material laminated on polyethylene film making it waterproof. It has an elastomeric cuff with adhesive that ensures a watertight seal between it and the glove. Delivery suite in a teaching hospital. Doctors and midwives were requested to wear the sleeve on top of the standard gown and gloves. Each user was assessed for blood contamination at the end of the procedure and a questionnaire detailing the extent of contamination and the views of the user was completed. Eighty questionnaires were completed. The contamination of arms and hands was 3.8% and 5%, respectively. Eighty-nine percent thought the sleeve had served its purpose and 76% said they would use it regularly. The sleeve is an effective protective device which complements the glove and gown. We recommend that it should be used during all obstetric procedures.

  18. Factors associated with acceptance of provider-initiated HIV testing and counseling among pregnant women in Ethiopia.

    Science.gov (United States)

    Gebremedhin, Ketema Bizuwork; Tian, Bingjie; Tang, Chulei; Zhang, Xiaoxia; Yisma, Engida; Wang, Honghong

    2018-01-01

    The global human immunodeficiency virus (HIV) epidemic disproportionately affects sub-Saharan African countries, including Ethiopia. Provider-initiated HIV testing and counseling (PITC) is a tool to identify HIV-positive pregnant women and an effective treatment and prevention strategy. However, its success depends upon the willingness of pregnant women to accept HIV testing. To describe the level of acceptance of PITC and associated factors among pregnant women attending 8 antenatal care clinics in Adama, Ethiopia. Trained nursing students and employees from an HIV clinic conducted face-to-face structured interviews in private offices at the clinics from August to September, 2016. Among the 441 respondents, 309 (70.1%) accepted PITC. Women with more antenatal care visits (odds ratio [OR] =2.59, 95% CI: 1.01-6.63), reported better quality of the PITC service (OR =1.91, 95% CI: 1.19-3.08), and higher level of knowledge on mother-to-child transmission (OR =1.82, 95% CI: 1.03-3.20), were more likely to accept PITC, while women who were older in age (OR =0.37, 95% CI: 0.19-0.74) and perceived negative attitudes from their partners toward HIV-positive results (OR =0.31, 95% CI: 0.10-0.94) were less likely to accept the PITC service. About one-third of pregnant women are not willing to accept PITC. When designing intervention program to improve the acceptance of PITC, we should take into consideration the personal factors, HIV-related knowledge, and attitude of women as well as institutional factors.

  19. Test procedures, AN/AIC-27 system and component units. [for space shuttle

    Science.gov (United States)

    Reiff, F. H.

    1975-01-01

    The AN/AIC-27 (v) intercommunication system is a 30-channel audio distribution which consists of: air crew station units, maintenance station units, and a central control unit. A test procedure for each of the above units and also a test procedure for the system are presented. The intent of the test is to provide data for use in shuttle audio subsystem design.

  20. 75 FR 38422 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-07-02

    ... 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of..., 2011. DATES: This rule is effective July 2, 2010. FOR FURTHER INFORMATION CONTACT: For program issues... Federal Regulations, as follows: PART 40--PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING...

  1. Resolve. Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    International Nuclear Information System (INIS)

    LAVENDER, J.C.

    2000-01-01

    RESOLVE. Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations

  2. Biological and chemical tests of contaminated soils to determine bioavailability and environmentally acceptable endpoints (EAE)

    International Nuclear Information System (INIS)

    Montgomery, C.R.; Menzie, C.A.; Pauwells, S.J.

    1995-01-01

    The understanding of the concept of bioavailability of soil contaminants to receptors and its use in supporting the development of EAE is growing but still incomplete. Nonetheless, there is increased awareness of the importance of such data to determine acceptable cleanup levels and achieve timely site closures. This presentation discusses a framework for biological and chemical testing of contaminated soils developed as part of a Gas Research Institute (GRI) project entitled ''Environmentally Acceptable Endpoints in Soil Using a Risk Based Approach to Contaminated Site Management Based on Bioavailability of Chemicals in Soil.'' The presentation reviews the GRI program, and summarizes the findings of the biological and chemical testing section published in the GRI report. The three primary components of the presentation are: (1) defining the concept of bioavailability within the existing risk assessment paradigm, (2) assessing the usefulness of the existing tests to measure bioavailability and test frameworks used to interpret these measurements, and (3) suggesting how a small selection of relevant tests could be incorporated into a flexible testing scheme for soils to address this issue

  3. Preanalytical errors in primary healthcare: a questionnaire study of information search procedures, test request management and test tube labelling.

    Science.gov (United States)

    Söderberg, Johan; Brulin, Christine; Grankvist, Kjell; Wallin, Olof

    2009-01-01

    Most errors in laboratory medicine occur in the preanalytical phase and are the result of human mistakes. This study investigated information search procedures, test request management and test tube labelling in primary healthcare compared to the same procedures amongst clinical laboratory staff. A questionnaire was completed by 317 venous blood sampling staff in 70 primary healthcare centres and in two clinical laboratories (response rate = 94%). Correct procedures were not always followed. Only 60% of the primary healthcare staff reported that they always sought information in the updated, online laboratory manual. Only 12% reported that they always labelled the test tubes prior to drawing blood samples. No major differences between primary healthcare centres and clinical laboratories were found, except for test tube labelling, whereby the laboratory staff reported better practices. Re-education and access to documented routines were not clearly associated with better practices. The preanalytical procedure in the surveyed primary healthcare centres was associated with a risk of errors which could affect patient safety. To improve patient safety in laboratory testing, all healthcare providers should survey their preanalytical procedures and improve the total testing process with a systems perspective.

  4. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  5. Acceptable level of radiation risk and its perception

    International Nuclear Information System (INIS)

    Kusama, Tomoko; Shinozaki, Motoshi; Yoshizawa, Yasuo

    1987-01-01

    The acceptable level of radiation risk for public members, that is 10 -5 /y, was proposed by ICRP and other international organizations. We studied to survey basic procedures of deriving this value and to derive an acceptable risk value in Japan by using similar procedures. The basic procedures to derive 10 -5 /y were found as follows; (1) 0.1 percent of annual mortality from all diseases, (2) 0.1 percent of life time risk, (3) one percent of mortality from all causes in each age cohort and (4) corresponding value to 1 mSv annual radiation exposure. From these bases we derived the value of 10 -5 /y as acceptable risk level in Japan. The perception to risk level of 10 -5 /y in conventional life was investigated by means of questionnaires for 1,095 college students living in Tokyo. The risks considered in this study were natural background radiation, coffee, skiing, X-ray diagnosis, spontaneous cancer, passive smoking and air pollution. The most acceptable risk was the risk related with natural background radiation. And the risk of natural background radiation was more easily accepted by the students who had knowledges on natural background radiation. On the other hand, the risk from air pollution or passive smoking was the most adverse one. (author)

  6. Acceptance testing in digital systens of mammography. Protocols applicability; Pruebas de aceptacion en equipos digitales de mamografia. Aplicabilidad de protocolos

    Energy Technology Data Exchange (ETDEWEB)

    Bermudez, R.; Espana, M.L.; Garcia Castanon, P.; Gomez Barrado, A.; Rodriguez Martin, G.; Fernandez Bedoya, B.

    2011-07-01

    Acceptance testing of mammographic imaging systems technical is the first approach in order to guarantee that mammograms will be achieved with the minimun radiation dose compatible with an image quality sutiable for diagnose purposes. The aim of this study is to assess the practical applicability of different protocols in acceptance test of digital mammographyc systems. This study has been carried out on the results of ltyhe acceptance tests of five flat panel digital mammographic systems. Parameters established in the systems technical specifications and those evaluated in the consulted protocols were tested. Due to the fact that the legislation oin our country does not demand to consider a specific protocol, the results obtained were also compared considering different existing protocols. Results show discrepancies between manufacturers limiting values and those established in the protocols. Some parameters, such as the authomatic exposure control compensation and the detector noise, were found out to meet or not the limiting value, depending on the selected protocol. From our results we could suggest, that protocols from manufacturers should be adapted to acknowledged documents on acceptance testing in digital mammography. They buyer representative could even specify the protocol to be followed during the acceptance tests. (Author). 25 refs.

  7. Acceptance testing in digital systems of mammography. Protocols applicability; Pruebas de aceptacion en equipos digitales de mamografia. Aplicabilidad de protocolos

    Energy Technology Data Exchange (ETDEWEB)

    Bermudez, R.; Espana, M.L.; Garcia Castanon, P.; Gomez Barrado, A.; Rodriguez Martin, G.; Fernandez Bedoya, B.

    2011-07-01

    Acceptance testing of mammographic imaging systems technical is the first approach in order to guarantee that mammograms will be achieved with the minimum radiation dose compatible with an image quality suitable for diagnose purposes. The aim of this study is to assess the practical applicability of different protocols in acceptance test of digital mammographic systems. This study has been carried out on the results of the acceptance tests of five flat panel digital mammographic systems. Parameters established in the systems technical specifications and those evaluated in the consulted protocols were tested. Due to the fact that the legislation in our country does not demand to consider a specific protocol, the results obtained were also compared considering different existing protocols. Results show discrepancies between manufacturers limiting values and those established in the protocols. Some parameters, such as the automatic exposure control compensation and the detector noise, were found out to meet or not the limiting value, depending on the selected protocol. From our results we could suggest, that protocols from manufacturers should be adapted to acknowledged documents on acceptance testing in digital mammography. They buyer representative could even specify the protocol to be followed during the acceptance tests. (Author). 25 refs.

  8. A procedure for the assessment of low frequency noise complaints.

    Science.gov (United States)

    Moorhouse, Andy T; Waddington, David C; Adams, Mags D

    2009-09-01

    The development and application of a procedure for the assessment of low frequency noise (LFN) complaints are described. The development of the assessment method included laboratory tests addressing low frequency hearing threshold and the effect on acceptability of fluctuation, and field measurements complemented with interview-based questionnaires. Environmental health departments then conducted a series of six trials with genuine "live" LFN complaints to test the workability and usefulness of the procedure. The procedure includes guidance notes and a pro-forma report with step-by-step instructions. It does not provide a prescriptive indicator of nuisance but rather gives a systematic procedure to help environmental health practitioners to form their own opinion. Examples of field measurements and application of the procedure are presented. The procedure and examples are likely to be of particular interest to environmental health practitioners involved in the assessment of LFN complaints.

  9. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  10. 10 CFR 431.193 - Test procedures for measuring energy consumption of distribution transformers.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for measuring energy consumption of distribution transformers. 431.193 Section 431.193 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY... § 431.193 Test procedures for measuring energy consumption of distribution transformers. The test...

  11. Laparoscopic Stephen-Fowler stage procedure: appropriate management for high intra-abdominal testes.

    Science.gov (United States)

    Agrawal, Amit; Joshi, Milind; Mishra, Pankaj; Gupta, Rahul; Sanghvi, Beejal; Parelkar, Sandesh

    2010-03-01

    The length of testicular vessels is the main length-limiting factor to bring down the testes in the scrotum. Fowler and Stephen proposed the division of testicular vessels, high and as far from the testes as possible to maintain collateral blood supply, to treat high intra-abdominal testes. Cortesi introduced the diagnostic laparoscopy and Jorden first did the laparoscopic orchiopexy for nonpalpable testes. We had done Fowler-Stephen staged orchiopexy for high intra-abdominal testes, in which both stages were done laparoscopically. In total, 17 testes of 13 patients had undergone laparoscopic staged Fowler-Stephen orchiopexy. The decision to perform a staged Fowler-Stephen orchiopexy was based on the distance of the testis from the deep inguinal ring on laparoscopy. If distance was more than 2.5 cm, then we proceeded to a laparoscopic staged Fowler-Stephen orchiopexy. In the first stage, testicular vessels were cauterized by bipolar diathermy. Laparoscopic second-stage Fowler-Stephen procedure was done 6 months after the first stage. Patients were regularly followed, and the success of the procedure was assessed by the size of the testes and the position in the scrotum. Testicular vascularity was assessed by color Doppler ultrasonography. There was no testicular atrophy on second stage and on follow-up. All testes were in the scrotum with good size on follow-up. There was no complication related to laparoscopy. In cases of high intra-abdominal testes, the staged Fowler-Stephen procedure should be the procedure of choice. This procedure yields a high success rate. Transaction of vessels by bipolar diathermy is a very safe, cost-effective method.

  12. Acceptability and Barriers to Uptake of Voluntary Counselling and Testing for HIV amongst Pregnant Women in Nigeria

    Directory of Open Access Journals (Sweden)

    Bukola Olateju Omolase

    2010-08-01

    Full Text Available AIM: This study was designed to determine the acceptability of voluntary counselling and testing (VCT for HIV and identify possible barriers to it’s uptake amongst pregnant women in a Nigerian community. METHODS: One hundred and twenty seven consenting pregnant women attending antenatal clinic at Federal Medical Centre, Owo were randomly selected and interviewed by the authors and two trained assistants. The study was conducted between August and October, 2007. The information obtained with the aid of semi –structured questionnaire included their bio data, awareness about VCT and vertical transmission of HIV-AIDS. Other information obtained included acceptability of VCT and barriers to its uptake. RESULT: Majority (85% were aware about vertical transmission of HIV, most (83.5% knew of VCT. They were predominantly willing to accept VCT (77.2% and were ready to recommend VCT to others(76.2%. The main identified barriers to uptake of voluntary counseling were fear of possible outcome (82.7% and risk of divorce (70.9%. CONCLUSION: Most respondents were aware of voluntary counselling and testing for HIV as well as the vertical transmission of HIV. Majority were willing to accept HIV test and recommend same to others. Barriers to uptake of HIV test included fear of possible outcome, lack of felt need, stigmatization and financial constraint. There is need to extend voluntary counselling and testing for HIV to all antenatal patients. [TAF Prev Med Bull 2010; 9(4.000: 309-314

  13. Review of the Factory Acceptance Tests and Cold Tests of the W7-X Superconducting Magnets

    International Nuclear Information System (INIS)

    Ehmler, H.; Baldzuhn, J.; Genini, L.

    2006-01-01

    The W7-X magnet system consists of 50 non-planar coils of five different types and 20 planar coils of two different types. Factory acceptance tests of the non-planar coils are carried out at the manufacturer site of Babcock-Noell, Germany, and for the planar coils at Tesla Engineering, UK. They consist of electrical insulation checks, mass flow measurements and leak tests. In the test facility of CEA Saclay, France, each coil is cooled down to ∼ 6 K and operated at nominal current. At least one coil of each type is quenched by increasing the inlet temperature. The characteristic parameters of the quench tests (temperature, pressure, speed of normal-conducting zone, etc.) will be presented. Coils of the same type show a uniform behavior. The occurrences of leaks during cool-down on planar coils revealed quality problems with aluminum welds and stress corrosion of stainless steel tubes at the soldered connections with copper heat sinks. AC tests (impulse and impedance tests) were applied to detect short circuits during the fabrication of the winding packs. High voltage DC tests under vacuum and low gas pressure (Paschen-minimum conditions) revealed electrical insulation defects, which had not been found using standard high-voltage tests. These were mainly due to voids and cavities present in the winding pack after vacuum impregnation, insufficient glass-epoxy wrapped insulation and inappropriate design of the Kapton insulated quench detection cables. The mass flow measurements of the superconductor showed that the deviation between individual double layers of the coils is within acceptable limits. Two winding packs were given up by the supplier because of a superconductor blockage with resin and a short circuited winding, respectively. All other quality issues could be resolved by repair or changes in the components. The coil instrumentation with temperature sensors seems to be adequate. The strain gauges need improvements in temperature compensation and gluing

  14. 118-B-1 excavation treatability test procedures

    International Nuclear Information System (INIS)

    Frain, J.M.

    1994-01-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel

  15. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  16. 100 Area soil washing bench-scale test procedures

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing

  17. 9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.

    Science.gov (United States)

    2010-01-01

    ... samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... for diagnostic testing. (b) The authorized laboratory must identify each egg as to the breeding flock...

  18. 77 FR 49063 - Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products

    Science.gov (United States)

    2012-08-15

    ... Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products; Proposed...-AC01 Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products... procedures for both dishwashers and conventional cooking products for the measurement of energy use in fan...

  19. Standards regulations and public acceptance

    International Nuclear Information System (INIS)

    Fernandez, E.C.

    1977-01-01

    Spanish nuclear legislation and the associated procedure for the authorization of installations is summarized. Public acceptance is discussed in the context of the needs for and hazards of nuclear energy. (U.K.)

  20. Solar panel acceptance testing using a pulsed solar simulator

    Science.gov (United States)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  1. Developing a Cloze Procedure as a Reading Comprehension Achievement Test

    Directory of Open Access Journals (Sweden)

    I Ketut Seken

    2004-01-01

    Full Text Available The project was concerned with developing a cloze procedure as a reading comprehension achievement test. The subjects were students of the English Department of the Faculty of Letters, State University of Malang, who were halfway in the semester to complete Reading II course. The test was planned and constructed on the foundation of existing theory of cloze test construction. A review of theory concerning reading comprehension, testing reading comprehension, and cloze testing led to the construction of the test, including the decision concerning how to score the test and to interpret the scores. Using a class of 28 students, the test was tried out a week after the mid-semester test was administered by the Reading II teacher. It was found that the test is sufficienty reliable on the basis of a reliability coefficient of .79 through split-half procedure and a coefficient value of .78 by K-R 20. The test also showed high inter-section correlation. The validity of the test was viewed in terms of face, content, and construct. The test scores correlate moderately with those obtained from the mid-semester test by the teacher. Some problems are discussed and a suggestion made with regard to a possible solution to these problems.

  2. Patients’ acceptance of corticotomy-assisted orthodontics

    Science.gov (United States)

    Zawawi, Khalid H

    2015-01-01

    Objective To study patients’ acceptance of corticotomy-assisted orthodontics as a treatment option. Methods Adult patients seeking orthodontic treatment were asked to complete two sets of questionnaires; the first set included questions about age, sex, and level of education and general questions about orthodontic treatment; and the second set was related to the corticotomy-assisted orthodontics. Before answering the corticotomy questions, a brief description of the clinical procedure was explained and photographs of an actual procedure were shown. Results A total of 150 subjects were approached and 129 (86%) agreed to answer the questionnaires (72 male and 57 female patients). Of these, only 3.1% did hear about corticotomy and 7.8% selected corticotomy instead of extraction. Fear from the surgery (53.2%) was the most frequent reason for not selecting corticotomy followed by fear from pain (36.9%). The acceptance of corticotomy between males and females was similar. No relationship was found between the level of education and prior knowledge of the procedure, P=0.857. Prior knowledge about corticotomy was not a factor in selecting it as a treatment option (P=0.556) to reduce the treatment time (P=0.427). Conclusion The acceptance of corticotomy-assisted orthodontics as a treatment option was low. Fear from the surgery was the main reason for not selecting it. The acceptance of corticotomy-assisted orthodontics was not related to patient’s level of education or sex. PMID:26316719

  3. Parametric fitting of data obtained from detectors with finite resolution and limited acceptance

    International Nuclear Information System (INIS)

    Gagunashvili, N.D.

    2011-01-01

    A goodness-of-fit test for fitting of a parametric model to data obtained from a detector with finite resolution and limited acceptance is proposed. The parameters of the model are found by minimization of a statistic that is used for comparing experimental data and simulated reconstructed data. Numerical examples are presented to illustrate and validate the fitting procedure.

  4. Acceptance Test Report for the Modular Automation System (MAS) Manufactured by Honeywell Inc

    International Nuclear Information System (INIS)

    ANDERSON, D.L.

    2000-01-01

    This document details the performance of the acceptance test of the Honeywell MAS Control System for equipment to be installed in gloveboxes HA-20MB and HA-211 at a later date. Equipment that was anticipated included 6 stabilization furnaces, only three and their associated equipment were installed

  5. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... Energy (DOE) is amending its test procedures for residential water heaters, direct heating equipment (DHE... necessary for residential water heaters, because the existing test procedures for those products already...

  6. 76 FR 56347 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2011-09-13

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... proposed to amend, where appropriate, its test procedures for residential water heaters, direct heating... notes that the test procedure and metric for residential water heaters currently address and incorporate...

  7. Laboratory procedures for waste form testing

    International Nuclear Information System (INIS)

    Mast, E.S.

    1994-01-01

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory

  8. Laboratory procedures for waste form testing

    Energy Technology Data Exchange (ETDEWEB)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  9. Screening for diabetes in optometry practices: acceptability to users.

    Science.gov (United States)

    Howse, Jennifer H; Jones, Steve; Hungin, A Pali S

    2011-07-01

    Diabetes is a leading cause of blindness in the working age population. While optometrists have an established role in screening people with known diabetes for eye disease, their role in screening for diabetes has not been evaluated. For diabetes screening in optometry practices to be successful it must be acceptable to both optometrists and to the public. The purpose of this study was to determine acceptability to people attending optometry practices of using random capillary blood glucose (rCBG) tests to detect raised blood glucose levels in optometry practices. A screening service offering people with risk factors or symptoms of diabetes rCBG tests was piloted in five high street opticians' practices in North East England. One thousand and two people used the screening service during a 20 week period. Each was given a questionnaire to complete and return following a rCBG test. Nine hundred and thirty-nine questionnaires were returned (return rate 93.7%). The mean age of participants was 54.5 years, 63.3% were female and 75.0% had not been screened for diabetes previously. 99.1% agreed or strongly agreed that the location was convenient for them and 98.0% would recommend others to use the screening service. 83.8% of the participants would not have gone elsewhere to have any tests done and 148 (16.2%) responded that they would have sought a test elsewhere; 14.2% at the GP, 0.8% at a pharmacy and 0.5% elsewhere. Only 3.2% reported that the test procedure was uncomfortable.   To those attending opticians' practices, screening using rCBG tests is acceptable in terms of convenience and test comfort, and they would recommend the test to others. Screening in optometry practices provides an opportunity to identify people at risk of diabetes in a hitherto unutilised setting. Ophthalmic & Physiological Optics © 2011 The College of Optometrists.

  10. HIV test offers and acceptance: New York State findings from the behavioral risk factor surveillance system and the National HIV behavioral surveillance, 2011-2012.

    Science.gov (United States)

    John Leung, Shu-Yin; Sinclair, Amber H; Battles, Haven B; Swain, Carol-Ann E; French, Patrick Tyler; Anderson, Bridget J; Sowizral, Mycroft J; Ruberto, Rachael; Brissette, Ian; Lillquist, Patricia; Smith, Lou C

    2015-01-01

    The New York State HIV testing law requires that patients aged 13-64 years be offered HIV testing in health care settings. We investigated the extent to which HIV testing was offered and accepted during the 24 months after law enactment. We added local questions to the Behavioral Risk Factor Surveillance System (BRFSS) and the National HIV Behavioral Surveillance (NHBS) surveys asking respondents aged 18-64 years whether they were offered an HIV test in health care settings, and whether they had accepted testing. Statewide prevalence estimates of test offers and acceptance were obtained from a combined 2011-2012 BRFSS sample (N = 6,223). Local estimates for 2 high-risk populations were obtained from NHBS 2011 men who have sex with men (N = 329) and 2012 injection drug users (N = 188) samples. BRFSS data showed that 73% of New Yorkers received care in any health care setting in the past 12 months, of whom 25% were offered an HIV test. Sixty percent accepted the test when offered. The levels of test offer increased from 20% to 29% over time, whereas acceptance levels decreased from 68% to 53%. NHBS data showed that 81% of men who have sex with men received care, of whom 43% were offered an HIV test. Eighty-eight percent accepted the test when offered. Eighty-five percent of injection drug users received care, of whom 63% were offered an HIV test, and 63% accepted the test when offered. We found evidence of partial and increasing implementation of the HIV testing law. Importantly, these studies demonstrated New Yorkers' willingness to accept an offered HIV test as part of routine care in health care settings.

  11. Usage and acceptability of HIV self-testing in men who have sex with men in Hong Kong.

    Science.gov (United States)

    Wong, Horas Tze Hoo; Tam, Hoi Yan; Chan, Denise Pui Chung; Lee, Shui Shan

    2015-03-01

    Whilst studies on over-the-counter HIV tests continue to accumulate after FDA's approval of OraQuick Advance in 2012, few have focused on men who have sex with men (MSM) in Asian cities. An internet survey was conducted on 1,122 MSM in Hong Kong, revealing a low usage (6.1 %) and acceptability rate (43.8 %) on self-testing despite its availability in the market. Hierarchical logistic regression models showed that having received relevant information and users' attitudes on self-testing were the determinants of usage and acceptability. These factors had greater effects than sexual behaviors and social-networking on MSM's decision on self-testing. Majority of ever self-testers only repeated the self-test after a non-negative result, and overall only 26.6 % went for a formal test subsequent to the self-test. Concerns regarding the tests' accuracy were expressed by respondents. In conclusion, appropriate and accessible information and evidence-based guidance are needed to incorporate self-testing into HIV prevention strategies targeting MSM.

  12. Project W-314 specific test and evaluation plan for SN-633 transfer line (241-AX-B to 241-AY-02A)

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation

  13. Is it acceptable to approach colorectal cancer patients at diagnosis to discuss genetic testing? A pilot study

    OpenAIRE

    Porteous, M; Dunckley, M; Appleton, S; Catt, S; Dunlop, M; Campbell, H; Cull, A

    2003-01-01

    In this pilot study, the acceptability of approaching 111 newly diagnosed colorectal cancer patients with the offer of genetic testing for hereditary nonpolyposis colorectal cancer (HNPCC) was assessed. A total of 78% of participants found it highly acceptable to have the information about HNPCC brought to their attention at that time.

  14. Understanding Student Teachers' Behavioural Intention to Use Technology: Technology Acceptance Model (TAM) Validation and Testing

    Science.gov (United States)

    Wong, Kung-Teck; Osman, Rosma bt; Goh, Pauline Swee Choo; Rahmat, Mohd Khairezan

    2013-01-01

    This study sets out to validate and test the Technology Acceptance Model (TAM) in the context of Malaysian student teachers' integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA), and structural equation…

  15. Acceptance criteria for reprocessed AcuNav catheters: comparison between functionality testing and clinical image assessment.

    Science.gov (United States)

    Bank, Alan J; Berry, James M; Wilson, Robert F; Lester, Bruce R

    2009-03-01

    The AcuNav-catheter is a vector-phased array ultrasound catheter that has shown great utility for both diagnosis and electrophysiological interventions. To test the feasibility of limited catheter reuse and to ensure that reprocessed catheters would produce acceptable clinical images, the present study compared the 2-D and Doppler image quality, as determined by clinical assessment, with the catheter's functional status as determined by the FirstCall 2000 transducer tester. Reprocessed catheters from four functional categories, two acceptable and two unacceptable, were used to collect images, 2-D and Doppler, from a porcine heart. The images were blinded and then rated by clinical evaluation. The study found that catheter images from all functional categories were found to be clinically acceptable except for those from the lowest unacceptable category. In addition, examination of tip deflection characteristics showed no significant difference between new and reprocessed catheters. We conclude that reprocessed AcuNav catheters that pass functional tests are able to produce clinical images, 2-D and Doppler, which are equivalent to their new counterparts.

  16. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  17. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  18. Acceptable level of radiation risk and its perception

    Energy Technology Data Exchange (ETDEWEB)

    Kusama, Tomoko; Shinozaki, Motoshi; Yoshizawa, Yasuo

    1987-03-01

    The acceptable level of radiation risk for public members, that is 10/sup -5//y, was proposed by ICRP and other international organizations. We studied to survey basic procedures of deriving this value and to derive an acceptable risk value in Japan by using similar procedures. The basic procedures to derive 10/sup -5//y were found as follows; (1) 0.1 percent of annual mortality from all diseases, (2) 0.1 percent of life time risk, (3) one percent of mortality from all causes in each age cohort and (4) corresponding value to 1 mSv annual radiation exposure. From these bases we derived the value of 10/sup -5//y as acceptable risk level in Japan. The perception to risk level of 10/sup -5//y in conventional life was investigated by means of questionnaires for 1,095 college students living in Tokyo. The risks considered in this study were natural background radiation, coffee, skiing, X-ray diagnosis, spontaneous cancer, passive smoking and air pollution. The most acceptable risk was the risk related with natural background radiation. And the risk of natural background radiation was more easily accepted by the students who had knowledges on natural background radiation. On the other hand, the risk from air pollution or passive smoking was the most adverse one.

  19. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  20. Acceptance testing and commissioning of Kodak Directview CR-850 digital radiography system.

    Science.gov (United States)

    Bezak, E; Nelligan, R A

    2006-03-01

    This Technical Paper describes Acceptance Testing and Commissioning of the Kodak DirectView CR-850 digital radiography system installed at the Royal Adelaide Hospital. The first of its type installed in Australia, the system is a "dry" image processor, for which no chemicals are required to develop images. Rather, latent radiographic images are stored on photostimulable phosphor screens, which are scanned and displayed by a reader unit. The image can be digitally processed and enhanced before it is forwarded to a storage device, printer or workstation display, thereby alleviating the need to re-expose patients to achieve satisfactory quality images. The phosphor screens are automatically erased, ready for re-use. Results are reported of tests carried out using the optional "Total Quality Tool" quality assurance package installed with the system. This package includes analysis and reporting software which provides for simple testing and reporting of many important characteristics of the system, such as field uniformity, aspect ratio, line and pixel positions, image and system noise, exposure response, scan linearity, modulation transfer function (MTF) and image artefacts. Acceptance Tests were performed for kV and MV exposures. Resolution for MV exposures was at least 0.8 l/mm, and measured phantom dimensions were within 1.05% of expected magnification. Reproducibility between cassettes was within 1.6%. The mean pixel values on the central axis were close to linear for MV exposures from 3 to 10 MU and reached saturation level at around 20 MU for 6 MV and around 30 MV for 23 MV beams. Noise levels were below 0.2 %.

  1. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  2. Probabilistic relationships in acceptable risk studies

    International Nuclear Information System (INIS)

    Benjamin, J.R.

    1977-01-01

    Acceptable risk studies involve uncertainties in future events; consequences and associated values, the acceptability levels, and the future decision environment. Probabilistic procedures afford the basic analytical tool to study the influence of each of these parameters on the acceptable risk decision, including their interrelationships, and combinations. A series of examples are presented in the paper in increasing complexity to illustrate the principles involved and to quantify the relationships to the acceptable risk decision. The basic objective of such studies is to broaden the scientific basis of acceptable risk decision making. It is shown that rationality and consistency in decision making is facilitated by such studies and that rather simple relationships exist in many situations of interest. The variation in criteria associated with an increase in the state of knowledge or change in the level of acceptability is also discussed. (Auth.)

  3. Probabilistic relationships in acceptable risk studies

    International Nuclear Information System (INIS)

    Benjamin, J.R.

    1977-01-01

    Acceptable risk studies involve uncertainties in future events: consequences and associated values, the acceptability levels, and the future decision environment. Probabilistic procedures afford the basic analytical tool to study the influence of each of these parameters on the acceptable risk decision, including their interrelationships, and combinations. A series of examples are presented in the paper in increasing complexity to illustrate the principles involved and to quantify the relationships to the acceptable risk decision. The basic objective of such studies is to broaden the scientific basis of acceptable risk decision making. It is shown that rationality and consistency in decision making is facilitated by such studies and that rather simple relationships exist in many situations of interest. The variation in criteria associated with an increase in the state of knowledge or change in the level of acceptability is also discussed

  4. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  5. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  6. Home-based voluntary HIV counselling and testing found highly acceptable and to reduce inequalities

    Directory of Open Access Journals (Sweden)

    Michelo Charles

    2010-06-01

    Full Text Available Abstract Background Low uptake of voluntary HIV counselling and testing (VCT in sub-Saharan Africa is raising acceptability concerns which might be associated with ways by which it is offered. We investigated the acceptability of home-based delivery of counselling and HIV testing in urban and rural populations in Zambia where VCT has been offered mostly from local clinics. Methods A population-based HIV survey was conducted in selected communities in 2003 (n = 5035. All participants stating willingness to be HIV tested were offered VCT at home and all counselling was conducted in the participants' homes. In the urban area post-test counselling and giving of results were done the following day whereas in rural areas this could take 1-3 weeks. Results Of those who indicated willingness to be HIV tested, 76.1% (95%CI 74.9-77.2 were counselled and received the test result. Overall, there was an increase in the proportion ever HIV tested from 18% before provision of home-based VCT to 38% after. The highest increase was in rural areas; among young rural men aged 15-24 years up from 14% to 42% vs. for urban men from 17% to 37%. Test rates by educational attainment changed from being positively associated to be evenly distributed after home-based VCT. Conclusions A high uptake was achieved by delivering HIV counselling and testing at home. The highest uptakes were seen in rural areas, in young people and groups with low educational attainment, resulting in substantial reductions in existing inequalities in accessing VCT services.

  7. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Science.gov (United States)

    2010-10-01

    ... and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a) From...

  8. 1 Patient acceptability and feasibility of HIV testing in emergency departments in the UK - a systematic review and meta-analysis.

    Science.gov (United States)

    Lungu, Nicola

    2017-12-01

    NICE 2016 HIV testing guidelines now include the recommendation to offer HIV testing in Emergency Departments, in areas of high prevalence, 1 to everyone who is undergoing blood tests. 23% of England's local authorities are areas of high HIV prevalence (>2/1000) and are therefore eligible. 2 So far very few Emergency Departments have implemented routine HIV testing. This systematic review assesses evidence for two implementation considerations: patient acceptability (how likely a patient will accept an HIV test when offered in an Emergency Department), and feasibility, which incorporates staff training and willingness, and department capacity, (how likely Emergency Department staff will offer an HIV test to an eligible patient), both measured by surrogate quantitative markers. Three medical databases were systematically searched for reports of non-targeted HIV testing in UK Emergency Departments. A total of 1584 unique papers were found, 9 full text articles were critically appraised, and 7 studies included in meta-analysis. There is a combined patient sample of 1 01 975. The primary outcome, patient acceptability of HIV testing in Emergency Departments (number of patients accepting an HIV test, as a proportion of those offered) is 54.1% (CI 40.1, 68.2). Feasibility (number of tests offered, as a proportion of eligible patients) is 36.2% (CI 9.8, 62.4). For an Emergency Department considering introducing routine HIV testing, this review suggests an opt-out publicity-lead strategy. Utilising oral fluid and blood tests would lead to the greatest proportion of eligible patients accepting an HIV test. For individual staff who are consenting patients for HIV testing, it may be encouraging to know that there is >50% chance the patient will accept an offer of testing.emermed;34/12/A860-a/T1F1T1Table 1Summary table of data extracted from final 7 studies, with calculated acceptability and feasibility if appropriate, and GRADE score. Studies listed in chronological

  9. Diagnostic accuracy and acceptability of rapid HIV oral testing among adults attending an urban public health facility in Kampala, Uganda.

    Directory of Open Access Journals (Sweden)

    Joanita Nangendo

    Full Text Available The prevalence of HIV in Uganda is 7.3%, and yet nearly 40% of people living with HIV are unaware of their status. The current HIV testing policy which is strictly blood-based poses several challenges including: a need for high level laboratory skills, stringent waste disposal needs, and painful sample collection. It is envisaged that introduction of a rapid, painless HIV oral fluid test as a potential alternative is likely to increase the number of people testing. The aim of this study was to determine the diagnostic accuracy and acceptability of rapid HIV oral testing among adults attending Kisenyi Health Centre IV in Kampala.We conducted a cross-sectional study among 440 adults recruited consecutively at Kisenyi Health Centre IV from January to March 2016. The diagnostic accuracy of the HIV oral test was assessed by comparing to the national HIV serial testing algorithm. We also assessed for acceptability among patients and health care workers (HCWs by triangulating responses from a structured questionnaire, three focus group discussions and seven key informant interviews. Acceptability was defined as willingness to take the test at the time of the study and intention for future use of the test if it was availed. The prevalence of HIV infection among study participants was 14.8%. The HIV oral fluid test was highly accurate with sensitivity of 100% (95% CI; 94.5-100.0, specificity of 100% (95% CI; 99.0-100.0, positive predictive value (PPV of 100% (95% CI; 94.5-100.0 and negative predictive value (NPV of 100% (95% CI; 99.0-100.0. Acceptability of HIV oral testing was also high at 87.0% (95% CI; 83.6-89.9. Participants preferred HIV oral testing because it was: pain free (91%, n = 399 and did not require blood draw (82%, n = 360.The HIV oral fluid test has high diagnostic accuracy and acceptability. HIV oral testing is a suitable addition to the national HIV testing strategies with the potential of increasing access to HIV testing services in

  10. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  11. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  12. Rock mass and shaft concrete lining temperature measurement procedure: Final draft

    International Nuclear Information System (INIS)

    1986-10-01

    This procedure document describes the equipment and procedures which will be used to obtain temperature data from within rock-mass and shaft linings at the Deaf Smith Exploratory Shaft Facility. Temperature measurement methods for instrument temperature correction, fluid temperature correction, heated surface monitoring and air temperature monitoring are outside the scope of this procedure, and are covered in the appropriate individual test procedures. Calibration, acceptance testing and the assignment of transducer reference numbers are outside the scope of this procedure. Section 2.0 provides a summary of the temperature measurement methods which will be employed, together with the measurement locations, environmental considerations and measurement requirements. Test layouts, including detailed descriptions of instruments, support requirements and detailed installation procedures are also presented. Section 3.0 describes the requirements for data recording, ADAS monitoring, and data reporting. Section 4.0 defines personnel responsibilities and qualifications. In addition a measurement and installation schedule is provided, and safety and contingency plans are described. Section 5.0 discusses management and quality assurance requirements. Cited references are listed in Section 6.0. 7 refs., 9 figs

  13. Disintegration of sublingual tablets: proposal for a validated test method and acceptance criterion.

    Science.gov (United States)

    Weda, M; van Riet-Nales, D A; van Aalst, P; de Kaste, D; Lekkerkerker, J F F

    2006-12-01

    In the Netherlands the market share of isosorbide dinitrate 5 mg sublingual tablets is dominated by 2 products (A and B). In the last few years complaints have been received from health care professionals on product B. During patient use the disintegration of the tablet was reported to be slow and/or incomplete, and ineffectiveness was experienced. In the European Pharmacopoeia (Ph. Eur.) no requirement is present for the disintegration time of sublingual tablets. The purpose of this study was to compare the in vitro disintegration time of products A and B, and to establish a suitable test method and acceptance criterion. A and B were tested with the Ph. Eur. method described in the monograph on disintegration of tablets and capsules as well as with 3 modified tests using the same Ph. Eur. apparatus, but without movement of the basket-rack assembly. In modified test 1 and modified test 2 water was used as medium (900 ml and 50 ml respectively), whereas in modified test 3 artificial saliva was used (50 ml). In addition, disintegration was tested in Nessler tubes with 0.5 and 2 ml of water. Finally, the Ph. Eur. method was also applied to other sublingual tablets with other drug substances on the Dutch market. With modified test 3 no disintegration could be achieved within 20 min. With the Ph. Eur. method and modified tests 1 and 2 product A and B differed significantly (p disintegration times. These 3 methods were capable of discriminating between products and between batches. The time measured with the Ph. Eur. method was significantly lower compared to modified tests 1 and 2 (p tablets the disintegration time should be tested. The Ph. Eur. method is considered suitable for this test. In view of the products currently on the market and taking into consideration requirements in the United States Pharmacopeia and Japanese Pharmacopoeia, an acceptance criterion of not more than 2 min is proposed.

  14. 14 CFR 413.11 - Acceptance of an application.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Acceptance of an application. 413.11 Section 413.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE APPLICATION PROCEDURES § 413.11 Acceptance of an application...

  15. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B H; Dam, J J.D. van; Delft, D R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  16. Regulatory Acceptance of Alternative Methods in the Development and Approval of Pharmaceuticals.

    Science.gov (United States)

    Beken, Sonja; Kasper, Peter; van der Laan, Jan-Willem

    acceptance of 3R testing approaches, including a process for collection of real-life data (safe harbour). Pathways for regulatory acceptance of 3R testing approaches are depicted and a new procedure for submission and evaluation of a proposal for regulatory acceptance of 3R testing approaches is described.

  17. 40 CFR 92.123 - Test procedure; general requirements.

    Science.gov (United States)

    2010-07-01

    ... the test. Auxiliary fan(s) may be used to maintain engine cooling during operation on the dynamometer... smoke. (1) In the raw exhaust sampling procedure, sample is collected directly from the exhaust stream... of another raw exhaust sample. The fuel flow rate for each throttle setting is measured. (2) For...

  18. 40 CFR 86.1527 - Idle test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ... from a single exhaust pipe in which exhaust products are homogeneously mixed. The configuration for... additional “Y” pipe be placed in the exhaust system before dilution. [48 FR 52252, Nov. 16, 1983... determine the raw concentration (in percent) of CO in the exhaust flow at idle. The test procedure begins...

  19. Reconnaissance On Chi-Square Test Procedure For Determining Two Species Association

    Science.gov (United States)

    Marisa, Hanifa

    2008-01-01

    Determining the assosiation of two species by using chi-square test has been published. Utility of this procedure to plants species at certain location, shows that the procedure could not find "ecologically" association. Tens sampling units have been made to record some weeds species in Indralaya, South Sumatera. Chi square test; Xt2 = N[|(ad)-(bc)|-(N/2)]2/mnrs (Eq:1) on two species (Cleome sp and Eleusine indica) of the weeds shows positive assosiation; while ecologically in nature, there is no relationship between them. Some alternatives are proposed to this problem; simplified chi-square test steps, make further study to find out ecologically association, or at last, ignore it.

  20. Patients’ Acceptance of Smartphone Health Technology for Chronic Disease Management: A Theoretical Model and Empirical Test

    Science.gov (United States)

    Dou, Kaili; Yu, Ping; Liu, Fang; Guan, YingPing; Li, Zhenye; Ji, Yumeng; Du, Ningkai; Lu, Xudong; Duan, Huilong

    2017-01-01

    Background Chronic disease patients often face multiple challenges from difficult comorbidities. Smartphone health technology can be used to help them manage their conditions only if they accept and use the technology. Objective The aim of this study was to develop and test a theoretical model to predict and explain the factors influencing patients’ acceptance of smartphone health technology for chronic disease management. Methods Multiple theories and factors that may influence patients’ acceptance of smartphone health technology have been reviewed. A hybrid theoretical model was built based on the technology acceptance model, dual-factor model, health belief model, and the factors identified from interviews that might influence patients’ acceptance of smartphone health technology for chronic disease management. Data were collected from patient questionnaire surveys and computer log records about 157 hypertensive patients’ actual use of a smartphone health app. The partial least square method was used to test the theoretical model. Results The model accounted for .412 of the variance in patients’ intention to adopt the smartphone health technology. Intention to use accounted for .111 of the variance in actual use and had a significant weak relationship with the latter. Perceived ease of use was affected by patients’ smartphone usage experience, relationship with doctor, and self-efficacy. Although without a significant effect on intention to use, perceived ease of use had a significant positive influence on perceived usefulness. Relationship with doctor and perceived health threat had significant positive effects on perceived usefulness, countering the negative influence of resistance to change. Perceived usefulness, perceived health threat, and resistance to change significantly predicted patients’ intentions to use the technology. Age and gender had no significant influence on patients’ acceptance of smartphone technology. The study also

  1. Procedure guideline for radioiodine test (version 3)

    International Nuclear Information System (INIS)

    Dietlein, M.; Schicha, H.; Eschner, W.; Deutsche Gesellschaft fuer Medizinische Physik; Koeln Univ.; Lassmann, M.; Deutsche Gesellschaft fuer Medizinische Physik; Wuerzburg Univ.; Leisner, B.; Allgemeines Krankenhaus St. Georg, Hamburg; Reiners, C.; Wuerzburg Univ.

    2007-01-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  2. Test/score/report: Simulation techniques for automating the test process

    Science.gov (United States)

    Hageman, Barbara H.; Sigman, Clayton B.; Koslosky, John T.

    1994-01-01

    A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary

  3. Development test procedure High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    Development testing will be performed on the water jet cleaning fixture to determine the most effective arrangement of water jet nozzles to remove contamination from the surfaces of canisters and other debris. The following debris may be stained with dye to simulate surface contaminates: Mark O, Mark I, and Mark II Fuel Storage Canisters (both stainless steel and aluminum), pipe of various size, (steel, stainless, carbon steel and aluminum). Carbon steel and stainless steel plate, channel, angle, I-beam and other surfaces, specifically based on the Scientific Ecology Group (SEG) inventory and observations of debris within the basin. Test procedure for developmental testing of High Pressure Water Jet System

  4. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  5. Quality assurance of radiopharmaceuticals - specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Colmanet, S.F.; Ivanov, Z.; Lauder, R.A.

    1990-10-01

    The authors report on a Radiopharmaceutical Quality Assurance Test Programme carried out by the Australian Radiation Laboratory in which radiopharmaceuticals used in nuclear medicine in Australia are tested for compliance with specifications. Where the radiopharmaceutical is the subject of a monograph in the British Pharmacopoeia or the European Pharmacopoeia, then the specifications given in the Pharmacopoeia are adopted. In other cases the specifications given have been adopted by this Laboratory and have no legal status. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods described have been developed at this Laboratory. It should be noted that, unless stated otherwise, specifications listed apply at all times up until product expire

  6. The Worlds First Ever Cooling Tower Acceptance Test Using Process Data Reconciliation

    International Nuclear Information System (INIS)

    Magnus Langenstein; Jan Hansen-Schmidt

    2006-01-01

    The cooling capacity of cooling towers is influenced by multiple constructive and atmospheric parameters in a very complex way. This leads to strong variations of the measured cold-water temperature and causes unacceptable unreliability of conventional acceptance tests, which are based on single point measurements. In order to overcome this lack of accuracy a new approach to acceptance test based on process data reconciliation has been developed by BTB Jansky and applied at a nuclear power plant. This approach uses process data reconciliation according to VDI 2048 to evaluate datasets over a long period covering different operating conditions of the cooling tower. Data reconciliation is a statistical method to determine the true process parameters with a statistical probability of 95% by considering closed material-, mass-and energy balances. Datasets which are not suitable for the evaluation due to strong transient gradients are excluded beforehand, according to well-defined criteria. The reconciled cold-water temperature is then compared, within a wet bulb temperature range of 5 deg. C to 20 deg. C to the manufacturer's guaranteed temperature. Finally, if the average deviation between reconciled and guaranteed value over the evaluated period is below zero, the cooling tower guarantee is fulfilled. (authors)

  7. [Procedure of seed quality testing and seed grading standard of Prunus humilis].

    Science.gov (United States)

    Wen, Hao; Ren, Guang-Xi; Gao, Ya; Luo, Jun; Liu, Chun-Sheng; Li, Wei-Dong

    2014-11-01

    So far there exists no corresponding quality test procedures and grading standards for the seed of Prunus humilis, which is one of the important source of base of semen pruni. Therefor we set up test procedures that are adapt to characteristics of the P. humilis seed through the study of the test of sampling, seed purity, thousand-grain weight, seed moisture, seed viability and germination percentage. 50 cases of seed specimens of P. humilis tested. The related data were analyzed by cluster analysis. Through this research, the seed quality test procedure was developed, and the seed quality grading standard was formulated. The seed quality of each grade should meet the following requirements: for first grade seeds, germination percentage ≥ 68%, thousand-grain weight 383 g, purity ≥ 93%, seed moisture ≤ 5%; for second grade seeds, germination percentage ≥ 26%, thousand-grain weight ≥ 266 g, purity ≥ 73%, seed moisture ≤9%; for third grade seeds, germination percentage ≥ 10%, purity ≥ 50%, thousand-grain weight ≥ 08 g, seed moisture ≤ 13%.

  8. South African physicians’ acceptance of e-prescribing technology: an empirical test of a modified UTAUT model

    Directory of Open Access Journals (Sweden)

    Jason Cohen

    2013-07-01

    Full Text Available E-prescribing systems hold promise for improving the quality and efficiency of the scripting process. Yet, the use of the technology has been associated with a number of challenges. The diffusion of e-prescribing into physician practices and the consequent realisation of its potential benefits will depend on whether physicians are willing to accept and engage with the technology. This study draws on the Unified Theory of Acceptance and Use of Technology (UTAUT and recent literature on user trust in technology to develop and test a model of the factors influencing South African physicians’ acceptance of e-prescribing. Data was collected from a sample of 72 physicians. Results indicate a general acceptance of e-prescribing amongst physicians who on average reported strong intentions to use e-prescribing technologies if given the opportunity. PLS analysis revealed that physicians’ performance expectancies and perceptions of facilitating conditions had significant direct effects on acceptance whilst trust and effort expectancy had important indirect effects. Social influence and price value perceptions did not add additional explanatory power. The model explained 63% of the variation in physician acceptance.

  9. Effect of Information about Animal Feeding on Consumer Acceptability of Sausages from Turopolje Pig Breed

    OpenAIRE

    Cerjak, Marija; Petrčić, Mario; Karolyi, Danijel

    2017-01-01

    Th e aim of this study was to examine the infl uence of information about pig feeding (conventional vs. acorn-fed) on consumer acceptability and probability of purchase of sausages made from local Turopolje pig breed. The study was conducted on a sample of 135 respondents using three step procedures: hedonic test in blind conditions, evaluation of expected preferences and informed hedonic test. Results showed that in the blind test sausage from conventionally-fed pigs were rated higher, but i...

  10. Criteria required for an acceptable point-of-care test for UTI detection: Obtaining consensus using the Delphi technique.

    Science.gov (United States)

    Weir, Nichola-Jane M; Pattison, Sally H; Kearney, Paddy; Stafford, Bob; Gormley, Gerard J; Crockard, Martin A; Gilpin, Deirdre F; Tunney, Michael M; Hughes, Carmel M

    2018-01-01

    Urinary Tract Infections (UTIs) are common bacterial infections, second only to respiratory tract infections and particularly prevalent within primary care. Conventional detection of UTIs is culture, however, return of results can take between 24 and 72 hours. The introduction of a point of care (POC) test would allow for more timely identification of UTIs, facilitating improved, targeted treatment. This study aimed to obtain consensus on the criteria required for a POC UTI test, to meet patient need within primary care. Criteria for consideration were compiled by the research team. These criteria were validated through a two-round Delphi process, utilising an expert panel of healthcare professionals from across Europe and United States of America. Using web-based questionnaires, panellists recorded their level of agreement with each criterion based on a 5-point Likert Scale, with space for comments. Using median response, interquartile range and comments provided, criteria were accepted/rejected/revised depending on pre-agreed cut-off scores. The first round questionnaire presented thirty-three criteria to the panel, of which 22 were accepted. Consensus was not achieved for the remaining 11 criteria. Following response review, one criterion was removed, while after revision, the remaining 10 criteria entered the second round. Of these, four were subsequently accepted, resulting in 26 criteria considered appropriate for a POC test to detect urinary infections. This study generated an approved set of criteria for a POC test to detect urinary infections. Criteria acceptance and comments provided by the healthcare professionals also supports the development of a multiplex point of care UTI test.

  11. 40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test of Solvent Cleaning Procedures A... CATEGORIES National Emission Standards for Halogenated Solvent Cleaning Pt. 63, Subpt. T, App. A Appendix A to Subpart T of Part 63—Test of Solvent Cleaning Procedures General Questions ___ 1. What is the...

  12. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  13. Bridging the Gap between Social Acceptance and Ethical Acceptability.

    Science.gov (United States)

    Taebi, Behnam

    2017-10-01

    New technology brings great benefits, but it can also create new and significant risks. When evaluating those risks in policymaking, there is a tendency to focus on social acceptance. By solely focusing on social acceptance, we could, however, overlook important ethical aspects of technological risk, particularly when we evaluate technologies with transnational and intergenerational risks. I argue that good governance of risky technology requires analyzing both social acceptance and ethical acceptability. Conceptually, these two notions are mostly complementary. Social acceptance studies are not capable of sufficiently capturing all the morally relevant features of risky technologies; ethical analyses do not typically include stakeholders' opinions, and they therefore lack the relevant empirical input for a thorough ethical evaluation. Only when carried out in conjunction are these two types of analysis relevant to national and international governance of risky technology. I discuss the Rawlsian wide reflective equilibrium as a method for marrying social acceptance and ethical acceptability. Although the rationale of my argument is broadly applicable, I will examine the case of multinational nuclear waste repositories in particular. This example will show how ethical issues may be overlooked if we focus only on social acceptance, and will provide a test case for demonstrating how the wide reflective equilibrium can help to bridge the proverbial acceptance-acceptability gap. © 2016 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.

  14. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  15. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  16. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  17. Patients' Acceptance of Smartphone Health Technology for Chronic Disease Management: A Theoretical Model and Empirical Test.

    Science.gov (United States)

    Dou, Kaili; Yu, Ping; Deng, Ning; Liu, Fang; Guan, YingPing; Li, Zhenye; Ji, Yumeng; Du, Ningkai; Lu, Xudong; Duan, Huilong

    2017-12-06

    Chronic disease patients often face multiple challenges from difficult comorbidities. Smartphone health technology can be used to help them manage their conditions only if they accept and use the technology. The aim of this study was to develop and test a theoretical model to predict and explain the factors influencing patients' acceptance of smartphone health technology for chronic disease management. Multiple theories and factors that may influence patients' acceptance of smartphone health technology have been reviewed. A hybrid theoretical model was built based on the technology acceptance model, dual-factor model, health belief model, and the factors identified from interviews that might influence patients' acceptance of smartphone health technology for chronic disease management. Data were collected from patient questionnaire surveys and computer log records about 157 hypertensive patients' actual use of a smartphone health app. The partial least square method was used to test the theoretical model. The model accounted for .412 of the variance in patients' intention to adopt the smartphone health technology. Intention to use accounted for .111 of the variance in actual use and had a significant weak relationship with the latter. Perceived ease of use was affected by patients' smartphone usage experience, relationship with doctor, and self-efficacy. Although without a significant effect on intention to use, perceived ease of use had a significant positive influence on perceived usefulness. Relationship with doctor and perceived health threat had significant positive effects on perceived usefulness, countering the negative influence of resistance to change. Perceived usefulness, perceived health threat, and resistance to change significantly predicted patients' intentions to use the technology. Age and gender had no significant influence on patients' acceptance of smartphone technology. The study also confirmed the positive relationship between intention to use

  18. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation. The scope of this test procedure is to validate the operation of FRS and IWTS components as a complete system. Fuel canisters shall be processed in accordance with this test procedure such that fuel inspection results are clearly attributed to a particular set of PCM operating parameters. The Phase 3 test sequence processes a minimum of six canisters. Twenty-four contingency canisters have been identified, and will be processed if additional performance data are required. The Phase 4 test sequence processes a minimum of 29 specific canisters. Twenty-nine contingency canisters have been identified for Phase 4 activities and will be processed to complete process validation, if

  19. Comparison of implant-abutment interface misfits after casting and soldering procedures.

    Science.gov (United States)

    Neves, Flávio Domingues das; Elias, Gisele Araújo; da Silva-Neto, João Paulo; de Medeiros Dantas, Lucas Costa; da Mota, Adérito Soares; Neto, Alfredo Júlio Fernandes

    2014-04-01

    The aim of this study was to compare vertical and horizontal adjustments of castable abutments after conducting casting and soldering procedures. Twelve external hexagonal implants (3.75 × 10 mm) and their UCLA abutments were divided according their manufacturer and abutment type: PUN (plastic UCLA, Neodent), PUC (plastic UCLA, Conexão), PU3i (plastic UCLA, Biomet 3i), and PUTN (plastic UCLA with Tilite milled base, Neodent). Three infrastructures of a fixed partial implant-supported bridge with 3 elements were produced for each group. The measurements of vertical (VM) and horizontal (HM) misfits were obtained via scanning electron microscopy after completion of casting and soldering. The corresponding values were determined to be biomechanically acceptable to the system, and the results were rated as a percentage. Statistical analysis establishes differences between groups by chi-square after procedures, and McNeman's test was applied to analyze the influence of soldering over casting (α ≤ .05). For the values of VM and HM, respectively, when the casting process was complete, it was observed that 83.25% and 100% (PUTN), 33.3% and 27.75% (PUN), 33.3% and 88.8% (PUC), 33.3% and 94.35% (PU3i) represented acceptable values. After completing the requisite soldering, acceptable values were 50% and 94.35% (PUTN), 16.6% and 77.7% (PUN), 38.55% and 77.7% (PUC), and 27.75% and 94.35% (PU3i). Within the limitations of this study, it can be concluded that the premachined abutments presented more acceptable VM values. The HM values were within acceptable limits before and after the soldering procedure for most groups. Further, the soldering procedure resulted in an increase of VM in all groups.

  20. [Statistical approach to evaluate the occurrence of out-of acceptable ranges and accuracy for antimicrobial susceptibility tests in inter-laboratory quality control program].

    Science.gov (United States)

    Ueno, Tamio; Matuda, Junichi; Yamane, Nobuhisa

    2013-03-01

    To evaluate the occurrence of out-of acceptable ranges and accuracy of antimicrobial susceptibility tests, we applied a new statistical tool to the Inter-Laboratory Quality Control Program established by the Kyushu Quality Control Research Group. First, we defined acceptable ranges of minimum inhibitory concentration (MIC) for broth microdilution tests and inhibitory zone diameter for disk diffusion tests on the basis of Clinical and Laboratory Standards Institute (CLSI) M100-S21. In the analysis, more than two out-of acceptable range results in the 20 tests were considered as not allowable according to the CLSI document. Of the 90 participating laboratories, 46 (51%) experienced one or more occurrences of out-of acceptable range results. Then, a binomial test was applied to each participating laboratory. The results indicated that the occurrences of out-of acceptable range results in the 11 laboratories were significantly higher when compared to the CLSI recommendation (allowable rate laboratory was statistically compared with zero using a Student's t-test. The results revealed that 5 of the 11 above laboratories reported erroneous test results that systematically drifted to the side of resistance. In conclusion, our statistical approach has enabled us to detect significantly higher occurrences and source of interpretive errors in antimicrobial susceptibility tests; therefore, this approach can provide us with additional information that can improve the accuracy of the test results in clinical microbiology laboratories.