Sample records for acceptance checkout equipment

  1. West Valley Demonstration Project vitrification process equipment Functional and Checkout Testing of Systems (FACTS)

    International Nuclear Information System (INIS)

    Carl, D.E.; Paul, J.; Foran, J.M.; Brooks, R.

    1990-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project was designed to convert stored radioactive waste into a stable glass for disposal in a federal repository. The Functional and Checkout Testing of Systems (FACTS) program was conducted from 1984 to 1989. During this time new equipment and processes were developed, installed, and implemented. Thirty-seven FACTS tests were conducted, and approximately 150,000 kg of glass were made by using nonradioactive materials to simulate the radioactive waste. By contrast, the planned radioactive operation is expected to produce approximately 500,000 kg of glass. The FACTS program demonstrated the effectiveness of equipment and procedures in the vitrification system, and the ability of the VF to produce quality glass on schedule. FACTS testing also provided data to validate the WVNS waste glass qualification method and verify that the product glass would meet federal repository acceptance requirements. The system was built and performed to standards which would have enabled it to be used in radioactive service. As a result, much of the VF tested, such as the civil construction, feed mixing and holding vessels, and the off-gas scrubber, will be converted for radioactive operation. The melter was still in good condition after being at temperature for fifty-eight of the sixty months of FACTS. However, the melter exceeded its recommended design life and will be replaced with a similar melter. Components that were not designed for remote operation and maintenance will be replaced with remote-use items. The FACTS testing was accomplished with no significant worker injury or environmental releases. During the last FACTS run, the VF processes approximated the remote-handling system that will be used in radioactive operations. Following this run the VF was disassembled for conversion to a radioactive process. Functional and checkout testing of new components will be performed prior to radioactive operation

  2. Integrated system checkout report

    International Nuclear Information System (INIS)

    1991-01-01

    The planning and preparation phase of the Integrated Systems Checkout Program (ISCP) was conducted from October 1989 to July 1991. A copy of the ISCP, DOE-WIPP 90--002, is included in this report as an appendix. The final phase of the Checkout was conducted from July 10, 1991, to July 23, 1991. This phase exercised all the procedures and equipment required to receive, emplace, and retrieve contact handled transuranium (CH TRU) waste filled dry bins. In addition, abnormal events were introduced to simulate various equipment failures, loose surface radioactive contamination events, and personnel injury. This report provides a detailed summary of each days activities during this period. Qualification of personnel to safely conduct the tasks identified in the procedures and the abnormal events were verified by observers familiar with the Bin-Scale CH TRU Waste Test requirements. These observers were members of the staffs of Westinghouse WID Engineering, QA, Training, Health Physics, Safety, and SNL. Observers representing a number of DOE departments, the state of new Mexico, and the Defense Nuclear Facilities Safety Board observed those Checkout activities conducted during the period from July 17, 1991, to July 23, 1991. Observer comments described in this report are those obtained from the staff member observers. 1 figs., 1 tab

  3. Project W-151 checkout-testing report

    Energy Technology Data Exchange (ETDEWEB)

    Nordquist, E.M.

    1997-01-31

    This document contains the completed checkout testing plan along with the exception log documenting exceptions which occurred during the test and their closure. This document also contains several minor open exceptions which will be closed upon installation of the radiation-sensitive equipment.

  4. Waste Isolation Pilot Plant contact-handled transuranic waste preoperational checkout: Final report

    International Nuclear Information System (INIS)

    1988-07-01

    This report documents the results of the WIPP CH TRU Preoperational Checkout which was completed between June 8 and June 14, 1988 during which period, a total of 10 TRUPACT shipping containers were processed from site receipt through emplacement of the simulated waste packages in the underground storage area. Since the design of WIPP includes provisions to unload an internally contaminated TRUPACT, in the controlled environment of the Overpack and Repair Room, one TRUPACT was partially processed through this sequence of operations to verify this portion of the waste handling process as part of the checkout. The successful completion of the CH TRU Preoperational Checkout confirmed the acceptability of WIPP operating procedures, personnel, equipment, and techniques. Extrapolation of time-line data using a computer simulation model of the waste handling process has confirmed that WIPP operations can achieve the design throughput capability of 500,000 ft 3 /year, if required, using two waste handling shifts. The single shift throughput capability of 273,000 ft 3 /year exceeds the anticipated operating receival rate of about 230,000 ft 3 /year. At the 230,000 ft 3 /year rate, the combined CH TRU annual operator dose and the average individual dose (based on minimum crew size) is projected to be 13.7 rem and 0.7 rem, respectively. 6 refs., 27 figs., 3 tabs

  5. Waste Isolation Pilot Plant RH TRU waste preoperational checkout: Final report

    International Nuclear Information System (INIS)

    1988-06-01

    This report documents the results of the Waste Isolation Pilot Plant (WIPP) Remote-Handled Transuranic (RH TRU) Waste Preoperational Checkout. The primary objective of this checkout was to demonstrate the process of handling RH TRU waste packages, from receipt through emplacement underground, using equipment, personnel, procedures, and methods to be used with actual waste packages. A further objective was to measure operational time lines to provide bases for confirming the WIPP design through put capability and for projecting operator radiation doses. Successful completion of this checkout is a prerequisite to the receipt of actual RH TRU waste. This checkout was witnessed in part by members of the Environmental Evaluation Group (EEG) of the state of New Mexico. Further, this report satisfies a key milestone contained in the Agreement for Consultation and Cooperation with the state of New Mexico. 4 refs., 26 figs., 4 tabs

  6. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1987-09-01

    This plan describes the preoperational checkout for handling Remote-Handled Transuranic (RH-TRU) Wastes from their receipt at the Waste Isolation Pilot Plant (WIPP) to their emplacement underground. This plan identifies the handling operations to be performed, personnel groups responsible for executing these operations, and required equipment items. In addition, this plan describes the quality assurance that will be exercised throughout the checkout, and finally, it establishes criteria by which to measure the success of the checkout. 7 refs., 5 figs

  7. The effect of different supermarket checkout workstations on trunk kinematics of checkout operators O efeito de diferentes modelos de checkout na cinemática de operadores de supermercado

    Directory of Open Access Journals (Sweden)

    André L. F. Rodacki

    2010-02-01

    Full Text Available OBJECTIVES: This study analyzed the effect of a standard and a modified checkout workstation during a simulated task on trunk postures of a supermarket checkout operator. METHODS: Eight participants performed a task involving grasping, scanning and depositing products, while 3D images of the trunk were collected. RESULTS: A number of kinematic changes were observed in trunk posture. A greater anterior flexion (3.0±1.2º and lateral bending during grasping (7.1±1.4º were found in the standard checkout workstation when compared to the modified model (p0.05. DISCUSSION: The modified checkout workstation provided less lateral bending of the trunk to grasp products (8.1º ± 2.8; p0.05, irrespective of the checkout workstations (p>0.05. The modified checkout workstation successfully reduced risk of injury in some aspects, particularly the problems associated with lateral bending of the trunk. Other studies are required to test whether such potential benefits are obtained on a daily basis. CONCLUSIONS: Supermarket checkout operators may be at high risk of occupational injury due to different workstation demands. Modifications to checkout workstation design are an attractive possibility to reduce postural stress and fatigue in checkout operators. Longitudinal studies are required to test whether changes observed in the present study are sustained in the long term.OBJETIVOS: Analisar o efeito de um modelo padrão e de um modificado de checkout durante uma tarefa simulada de um operador de caixa de supermercado. MÉTODOS: Oito participantes desempenharam uma tarefa envolvendo apanhar, ler e depositar produtos, enquanto imagens 3D do tronco foram coletadas. RESULTADOS: Um número de mudanças cinemáticas foram observadas na postura do tronco. Uma maior flexão anterior (3.0±1.2º e uma inclinação lateral durante o apanhar (7.1±1.4º foram encontradas no checkout padrão quando comparadas ao modelo modificado (p0.05. DISCUSSÃO: O checkout

  8. Healthy Checkout Lines: A Study in Urban Supermarkets.

    Science.gov (United States)

    Adjoian, Tamar; Dannefer, Rachel; Willingham, Craig; Brathwaite, Chantelle; Franklin, Sharraine

    2017-09-01

    To understand the impact of healthy checkouts in Bronx, New York City supermarkets. Consumer purchasing behavior was observed for 2 weeks in 2015. Three supermarkets in the South Bronx. A total of 2,131 adult shoppers (aged ≥18 years) who paid for their groceries at 1 of the selected study checkout lines. Two checkout lines were selected per store; 1 was converted to a healthy checkout and the other remained as it was (standard checkout). Data collectors observed consumer behavior at each line and recorded items purchased from checkout areas. Percentage of customers who purchase items from the checkout area; quantity and price of healthy and unhealthy items purchased from the healthy and standard checkout lines. Measures were analyzed by study condition using chi-square and t tests; significance was determined at α = .05. Only 4.0% of customers bought anything from the checkout area. A higher proportion of customers using the healthy vs standard checkout line bought healthy items (56.5% vs 20.5%; P < .001). When healthier products were available, the proportion of healthy purchases increased. Findings contribute to limited research on effectiveness of healthy checkouts in supermarkets. Similar interventions should expect an increase in healthy purchases from the checkout area, but limited overall impact. Copyright © 2017 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  9. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  10. Pester power: snackfoods displayed at supermarket checkouts in Melbourne, Australia.

    Science.gov (United States)

    Dixon, Helen; Scully, Maree; Parkinson, Kristiina

    2006-08-01

    To establish the amount and accessibility of snack food displayed at supermarket checkouts located in Melbourne, Australia. Observational survey of 24 randomly selected supermarkets situated within a 20-kilometre radius of Melbourne's General Post Office. Individual checkouts within each store (n=257) were observed to determine the types of items that were displayed, how they were promoted, and whether they were within the reach of children. All supermarkets surveyed displayed food products at their checkouts, with most checkouts displaying chocolate (87%), gum (81%) and sweets (80%). Only 7% of checkouts had their display of foods or drinks out of the reach of children. Foods displayed at supermarket checkouts in Melbourne are predominantly energy-dense confectionery items. They are often promoted in a way that targets children and encourages parents to impulse buy for their children.

  11. The Northern regional programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the UK Northern Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. Organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, the final visit just prior to the end of the manufacturers warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details limiting values for the acceptance test measurements are given. In some instances testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  12. The Northern Regional Programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. The organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, and the final visit just prior to the end of the manufacturer's warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first visit. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details of the limiting values for the acceptance test measurements are given. The results of the programme are discussed. In some instances the testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  13. Acceptance of the institutions and the organs of inspection for the nuclear under pressure equipment

    International Nuclear Information System (INIS)

    2006-05-01

    The candidate companies in the acceptance have to justify their competence in inspection on one hand, in nuclear pressure equipment on the other hand. The guide defines the conditions of the acceptance (competence and modes of proof), the contents of the demand of acceptance, the procedure of instruction as well as the conditions of the preservation of the acceptance. The general direction of the nuclear safety and the radiation protection implements the control of the companies and the organs of inspection for their activities in nuclear equipment under pressure. (N.C.)

  14. Expansion of the acceptance program: nitrous oxide scavenging equipment and nitrous oxide trace gas monitoring equipment

    Energy Technology Data Exchange (ETDEWEB)

    1977-10-01

    The Acceptance Program for dental materials and devices and the general guidelines for submission of products have been reported in the Journal (88:615 March 1974). At its April 1977 meeting, the Council included equipment for scavenging and monitoring trace nitrous oxide gas in its Acceptance Program. The Council has established the effective date for classification of products under these two sets of guidelines as one year from the date of publication of this announcement. After that date, classification of a product will be required before promotion or exhibition in Association media.

  15. Specification and acceptance testing of nuclear medicine equipment

    International Nuclear Information System (INIS)

    Wegst, A.V.; Erickson, J.J.

    1984-01-01

    The purchase of nuclear medicine equipment is of prime importance in the operation of a clinical service. Failure to properly evaluate the potential uses of the instrumentation and the various operational characteristics of the equipment can often result in the purchase of inappropriate or inferior instruments. The magnitude of the purchase in terms of time and financial investments make it imperative that the purchase be approached in a systematic manner. Consideration of both the intended clinical functions and personnel requirements is important. It is necessary also to evaluate the ability of the equipment vendor to support the instrumentation after the purchase has been completed and the equipment installed in the clinical site. The desired specifications of the instrument characteristics should be stated in terms that can be verified by acceptance testing. The complexity of modern instrumentation and the sensitivity of it to the environment require the buyer to take into account the potential problems of controlling the temperature, humidity, and electrical power of the installation site. If properly and systematically approached, the purchase of new nuclear medicine instrumentation can result in the acquisition of a powerful diagnostic tool which will have a useful lifetime of many years. If not so approached, it may result in the expenditure of a large amount of money and personnel time without the concomitant return in useful clinical service. (author)

  16. Regulation E 67-13. Opinion of acceptance for the clinical use of medical equipment using radiation

    International Nuclear Information System (INIS)

    2015-01-01

    The objective of this regulation is to establish the regulatory requirements for the granting of the 'Act of Acceptance for the clinical use of radiation Medical Equipment employing' complementing the provisions of the 'Regulations for the Evaluation and State Control of Medical Equipment' and aims help to improve the legal basis of the Regulatory technical Medical Equipment Program. The provisions of this regulation is aimed at any institution of the National Health System, hereinafter applicant required an Opinion of Acceptance for the clinical use of a medical team that uses radiation to authorization of use in humans.

  17. Typical design/qualification acceptance criteria for newly installed pipelines and equipment components of VVER-type NPPs

    International Nuclear Information System (INIS)

    Masopust, R.

    2003-01-01

    This paper describes in general the typical design/qualification acceptance criteria and seismic acceptance criteria in particular that are applicable for important to safety newly installed pipelines and equipment components of VVER-type already existing NPPs, specifically during the design verification phase of this newly installed equipment. These criteria are currently used for VVER 440-213 and VVER 1000 NPPs in Czech Republic and in Slovakia. The similar criteria are also used in Hungary. (author)

  18. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  19. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  20. Guideline on evaluation and acceptance of commercial grade digital equipment for nuclear safety applications

    International Nuclear Information System (INIS)

    1996-10-01

    Nuclear power plants are increasingly upgrading their instrumentation and control (I ampersand C) systems with commercial digital equipment, which allows them to continue meeting safety and reliability requirements while controlling operating costs. However, the use of commercial software-based devices for safety related applications has raised new issues that impact design, procurement, and licensing activities. This guideline describes a consistent, comprehensive approach for the evaluation and acceptance of commercial digital equipment for nuclear safety systems

  1. The proportion of unhealthy foodstuffs children are exposed to at the checkout of convenience supermarkets.

    Science.gov (United States)

    Horsley, Jason A; Absalom, Katie Ar; Akiens, Evie M; Dunk, Robert J; Ferguson, Alice M

    2014-11-01

    To investigate the proportion of foods that are unhealthy to which children are exposed at the checkout of convenience supermarkets. We performed a cross-sectional survey of foodstuffs displayed at the checkout. Products displayed at or below children's eye-level were designated as healthy, unhealthy or unclassifiable using the Food Standards Agency's scoring criteria. Thirteen convenience supermarkets from the three leading UK supermarket chains were selected on the basis of proximity to the town hall in Sheffield, England. Convenience supermarkets were defined as branches of supermarket chains that were identified as being other than superstores on their company's store locator website. In almost all of the convenience supermarkets surveyed, the main healthy product on display was sugar-free chewing gum. On average, when chewing gum was not included as a foodstuff, 89% of the products on display at the checkouts of convenience supermarkets were unhealthy using the Food Standards Agency's criteria. One store was a notable outlier, providing only fruit and nuts at its checkout. The overwhelming majority of products to which children are exposed at the convenience supermarket checkout are unhealthy. This is despite all the supermarket chains surveyed having signed up to the UK Government's 'responsibility deal'.

  2. Communication at Work: An Ethnography of Checkout Operators.

    Science.gov (United States)

    Searle, Jean

    1991-01-01

    A framework for identifying information regarding workplace communication requirements is presented that assumes communication involves sign systems as well as spoken and written language. Research with suburban supermarket checkout operators indicates that communication is deeply embedded in the social context. (Contains 18 references.) (LB)

  3. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from equipment suppliers of manufacturers in new and existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing quality status of the equipment. A working group has developed guidelines for these acceptance tests. Items to be measured are reported and proposed limiting values and their tolerances are discussed. (author)

  4. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from the equipment suppliers or manufacturers in new and also existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing the quality status of the equipment. A working group has developed guidelines for these acceptance tests. The items to be measured are reported and the proposed limiting values and their tolerances are discussed. (author)

  5. Development of an instrument for assessing workstyle in checkout cashier work (BAsIK).

    Science.gov (United States)

    Kjellberg, Katarina; Palm, Peter; Josephson, Malin

    2012-01-01

    Checkout cashier work consists of handling a large number of items during a work shift, which implies repetitive movements of the shoulders, arms and hands/wrists, and a high work rate. The work is associated with a high prevalence of disorders in the neck and upper extremity. The concept of workstyle explains how ergonomic and psychosocial factors interact in the development of work-related upper extremity disorders. The aim of the project was to develop an instrument for the occupational health services to be used in the efforts to prevent upper extremity disorders in checkout cashier work. The instrument is based on the workstyle concept and is intended to be used as a tool to identify high-risk workstyle and needs for interventions, such as training and education. The instrument, BAsIK, consists of four parts; a questionnaire about workstyle, an observation protocol for work technique, a checklist about the design of the checkout and a questionnaire about work organization. The instrument was developed by selecting workstyle items developed for office work and adapting them to checkout cashier work, discussions with researchers and ergonomists, focus-group interviews with cashiers, observations of video recordings of cashiers, and studies of existing guidelines and checklists.

  6. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    Energy Technology Data Exchange (ETDEWEB)

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  7. Evaluation of the control system checkout test results for YGN 3

    International Nuclear Information System (INIS)

    Hong, Eon Young; Shon, Suk Whun; Kim, Shim Whan; Sung, Kang Sik; Seo, Jong Tae.

    1996-11-01

    During the Yonggwang Nuclear Power Plant Unit 3 (YGN3) Power Ascension Test (PAT) period, the Control System Checkout tests were performed at 10%, 20%, 50%, 80%, and 100% respectively. This test evaluates the performance of the feedwater control system, reactor regulating system, pressurizer level and pressure control system in controlling their respective parameters within specified control bands at different power levels. The first test evaluates the ability of the FWCS to control steam generator 1 and 2 water levels during steady and transient conditions. The SG level setpoint was changed from normal SG level. The FWCS no.1 and no.2 controlled the SG water level to the new setpoint within the acceptable band. The second test evaluates the ability of the reactor regulating system (RRS) to control reactor coolant system (RCS) average temperature with respect to the reference temperature. The final test evaluates the ability of all of the control systems to work in an integrated manner controlling their respective parameters while the plant is at steady state conditions. The FWCS, RRS, SBCS, PLCS control their respective parameters within the control bands. The tests performed at Unit 3 were successful by meeting all of the test acceptable criteria. The measured test data for the major plant parameters were collected and evaluated. (author). 14 tabs., 217 figs., 7 refs

  8. Food at checkouts in non-food stores: a cross-sectional study of a large indoor shopping mall.

    Science.gov (United States)

    Wright, James; Kamp, Erin; White, Martin; Adams, Jean; Sowden, Sarah

    2015-10-01

    To investigate the display of food at non-food store checkouts; and to classify foods by type and nutrient content, presence of price promotions and whether food was at child height. Cross-sectional survey of checkout displays at non-food stores. Foods were classified as 'less healthy' or healthier using the UK Food Standards Agency's Nutrient Profile Model. Written price promotions were recorded. Child height was defined as the sight line of an 11-year-old approximated from UK growth charts. A large indoor shopping mall, Gateshead, UK, February-March 2014. Two hundred and five out of 219 non-food stores in the shopping mall directory which were open for trading. Thirty-two (15·6%) of 205 non-food stores displayed food at the checkout. All displayed less healthy foods, and fourteen (43·8%) had healthier foods. Overall, 5911 checkout foods were identified. Of these, 4763 (80·6%) were 'less healthy'. No fruits, vegetables, nuts or seeds were found. Of 4763 less healthy foods displayed, 195 (4·1%) were subject to price promotions, compared with twelve of 1148 (1·0%) healthier foods (χ 2(df=1)=25·4, P<0·0001). There was no difference in the proportion of less healthy (95·1%) and healthier (96·2%) foods displayed at child height. Almost one-sixth of non-food stores displayed checkout food, the majority of which was 'less healthy' and displayed at child height. Less healthy food was more likely to be subject to a written price promotion than healthier food. Further research into the drivers and consequences of checkout food in non-food stores is needed. Public health regulation may be warranted.

  9. Development of an automated checkout, service and maintenance system for a Space Station EVAS

    Science.gov (United States)

    Abeles, Fred J.; Tri, Terry; Blaser, Robert

    1988-01-01

    The development of a new operational system for the Space Station will minimize the time normally spent on performing on-orbit checkout, servicing, and maintenance of an extravehicular activity system of the Space Station. This system, the Checkout, Servicing, and Maintenance System (COSM), is composed of interactive control software interfacing with software simulations of hardware components. The major elements covered in detail include the controller, the EMU simulator and the regenerative life support system. The operational requirements and interactions of the individual elements as well as the protocols are also discussed.

  10. Presence of Candy and Snack Food at Checkout in Chain Stores: Results of a Pilot Study.

    Science.gov (United States)

    Basch, Corey H; Kernan, William D; Menafro, Anthony

    2016-10-01

    Community health professionals must use multiple strategies to address the rising rates of childhood obesity in the United States. One such strategy is to address the underlying causes of childhood obesity, including lack of exercise and the consumption of calorically-dense snack foods. This study examines the presence of candy and snack food in the checkout lines of all retail chain stores in a selected community to determine the presence of these products, the ways in which these products are promoted, and the type of physical environment through which customers navigate during the checkout process. The findings confirm that candy, soft drinks, snacks, and ice cream were present in a large majority of these retail stores. Further, this pilot study found that many of these stores "corral" customers through the check-out line in such a way that it is necessary to pass these snack foods directly. Three themes for discussion emerged from the review of the data collected, including product marketing, product packaging, and product placement. Implications for childhood health are presented in the context of these marketing strategies. The results and subsequent discussion provide important insight into the ways in which the presence of candy and snack food at checkout lines might contribute to childhood obesity rates.

  11. Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

    Science.gov (United States)

    Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)

    1998-01-01

    The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

  12. An analysis of the number of parking bays and checkout counters for a supermarket using SAS simulation studio

    Science.gov (United States)

    Kar, Leow Soo

    2014-07-01

    Two important factors that influence customer satisfaction in large supermarkets or hypermarkets are adequate parking facilities and short waiting times at the checkout counters. This paper describes the simulation analysis of a large supermarket to determine the optimal levels of these two factors. SAS Simulation Studio is used to model a large supermarket in a shopping mall with car park facility. In order to make the simulation model more realistic, a number of complexities are introduced into the model. For example, arrival patterns of customers vary with the time of the day (morning, afternoon and evening) and with the day of the week (weekdays or weekends), the transport mode of arriving customers (by car or other means), the mode of payment (cash or credit card), customer shopping pattern (leisurely, normal, exact) or choice of checkout counters (normal or express). In this study, we focus on 2 important components of the simulation model, namely the parking area, the normal and express checkout counters. The parking area is modeled using a Resource Pool block where one resource unit represents one parking bay. A customer arriving by car seizes a unit of the resource from the Pool block (parks car) and only releases it when he exits the system. Cars arriving when the Resource Pool is empty (no more parking bays) leave without entering the system. The normal and express checkouts are represented by Server blocks with appropriate service time distributions. As a case study, a supermarket in a shopping mall with a limited number of parking bays in Bangsar was chosen for this research. Empirical data on arrival patterns, arrival modes, payment modes, shopping patterns, service times of the checkout counters were collected and analyzed to validate the model. Sensitivity analysis was also performed with different simulation scenarios to identify the parameters for the optimal number the parking spaces and checkout counters.

  13. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  14. Mission Specialist Pedro Duque undergoes equipment check prior to launch

    Science.gov (United States)

    1998-01-01

    In the Operations and Checkout Building, STS-95 Mission Specialist Pedro Duque of Spain, with the European Space Agency, gets help with his suit from suit technician Tommy McDonald. The STS-95 crew were conducting flight crew equipment fit checks prior to launch on Oct. 29. STS-95 is expected to launch at 2 p.m. EST on Oct. 29, last 8 days, 21 hours and 49 minutes, and land at 11:49 a.m. EST on Nov. 7.

  15. Effects of Check-In/Checkout on Behavioral Indices and Mathematics Generalization

    Science.gov (United States)

    Mong, Michael D.; Johnson, Kristin N.; Mong, Kristi W.

    2011-01-01

    Check-in/checkout (CICO) is a behavioral intervention that is used to provide systematic feedback about a student's behavior at the beginning and end of each school day. The purpose of the present study was to evaluate the effectiveness of CICO on decreasing problem behaviors and the collateral effects on mathematics performance for 4 at-risk…

  16. Paying for Express Checkout: Competition and Price Discrimination in Multi-Server Queuing Systems

    Science.gov (United States)

    Deck, Cary; Kimbrough, Erik O.; Mongrain, Steeve

    2014-01-01

    We model competition between two firms selling identical goods to customers who arrive in the market stochastically. Shoppers choose where to purchase based upon both price and the time cost associated with waiting for service. One seller provides two separate queues, each with its own server, while the other seller has a single queue and server. We explore the market impact of the multi-server seller engaging in waiting cost-based-price discrimination by charging a premium for express checkout. Specifically, we analyze this situation computationally and through the use of controlled laboratory experiments. We find that this form of price discrimination is harmful to sellers and beneficial to consumers. When the two-queue seller offers express checkout for impatient customers, the single queue seller focuses on the patient shoppers thereby driving down prices and profits while increasing consumer surplus. PMID:24667809

  17. Paying for express checkout: competition and price discrimination in multi-server queuing systems.

    Directory of Open Access Journals (Sweden)

    Cary Deck

    Full Text Available We model competition between two firms selling identical goods to customers who arrive in the market stochastically. Shoppers choose where to purchase based upon both price and the time cost associated with waiting for service. One seller provides two separate queues, each with its own server, while the other seller has a single queue and server. We explore the market impact of the multi-server seller engaging in waiting cost-based-price discrimination by charging a premium for express checkout. Specifically, we analyze this situation computationally and through the use of controlled laboratory experiments. We find that this form of price discrimination is harmful to sellers and beneficial to consumers. When the two-queue seller offers express checkout for impatient customers, the single queue seller focuses on the patient shoppers thereby driving down prices and profits while increasing consumer surplus.

  18. Advanced gamma ray balloon experiment ground checkout and data analysis

    Science.gov (United States)

    Blackstone, M.

    1976-01-01

    A software programming package to be used in the ground checkout and handling of data from the advanced gamma ray balloon experiment is described. The Operator's Manual permits someone unfamiliar with the inner workings of the software system (called LEO) to operate on the experimental data as it comes from the Pulse Code Modulation interface, converting it to a form for later analysis, and monitoring the program of an experiment. A Programmer's Manual is included.

  19. AUS diffusion module POW checkout - 1- and 2-dimensional kinetics calculations

    International Nuclear Information System (INIS)

    Pollard, J.P.

    1977-01-01

    POW is the diffusion module 'workhorse' of the AUS reactor neutronics modular code system; its steady state calculations have been checked out against other diffusion codes (particularly CRAM and GOG). Checkout of kinetic aspects, however, is difficult as kinetic codes are not freely available. In this report POW has been checked against three benchmark calculations as well as a calculation on the 100 KW Argonaut reactor Moata. (author)

  20. A postura no trabalho dos operadores de checkout de supermercados: uma necessidade constante de análises Supermarket checkout operators posture at work: The continuous need for analysis

    Directory of Open Access Journals (Sweden)

    Eduardo Concepción Batiz

    2009-04-01

    Full Text Available As condições de trabalho nas quais os operadores de checkout de supermercados realizam suas atividades têm sido uma preocupação dos especialistas nos últimos tempos. Essa pesquisa foi realizada em oito supermercados de duas cidades do Brasil com o objetivo de conhecer as condições em que os operadores realizam suas atividades, detectando os fatores de risco para propor medidas que eliminem ou minimizem o aparecimento de efeitos adversos nos trabalhadores. Foi aplicado um questionário e o método RULA a uma amostra de 80 trabalhadores. O estudo mostrou que o mobiliário não está adaptado às características antropométricas da população, a maioria das posturas analisadas é inadequada, não existem revezamento nem pausas que poderiam ajudar a minimizar a situação, existência de sobrecarga, mental e física, entre outras. Conclui-se que a atividade pode representar riscos à saúde dos operadores de caixa de supermercados.The work conditions in which supermarket checkout operators perform activities have been a recent concern to specialists. This research was carried out in eight supermarkets of two cities in Brazil with the aim of knowing the conditions under which operators work, in order to detect risk factors and to propose procedures that could eliminate or minimize their adverse effects on workers. Structured questionnaire and the RULA method was applied to a sample of 80 workers. Major findings of the study as follows: furniture was not adapted to anthropometric characteristics of the workers, most of analyzed positions are not adequate, there was no rotation or pauses that could reduce the risk, there was a significant amount of mental and physical work overload. We conclude that, under current conditions, checkout operations at supermarkets poses health risk to operators.

  1. Design and Checkout of a High Speed Research Nozzle Evaluation Rig

    Science.gov (United States)

    Castner, Raymond S.; Wolter, John D.

    1997-01-01

    The High Flow Jet Exit Rig (HFJER) was designed to provide simulated mixed flow turbojet engine exhaust for one- seventh scale models of advanced High Speed Research test nozzles. The new rig was designed to be used at NASA Lewis Research Center in the Nozzle Acoustic Test Rig and the 8x6 Supersonic Wind Tunnel. Capabilities were also designed to collect nozzle thrust measurement, aerodynamic measurements, and acoustic measurements when installed at the Nozzle Acoustic Test Rig. Simulated engine exhaust can be supplied from a high pressure air source at 33 pounds of air per second at 530 degrees Rankine and nozzle pressure ratios of 4.0. In addition, a combustion unit was designed from a J-58 aircraft engine burner to provide 20 pounds of air per second at 2000 degrees Rankine, also at nozzle pressure ratios of 4.0. These airflow capacities were designed to test High Speed Research nozzles with exhaust areas from eighteen square inches to twenty-two square inches. Nozzle inlet flow measurement is available through pressure and temperature sensors installed in the rig. Research instrumentation on High Speed Research nozzles is available with a maximum of 200 individual pressure and 100 individual temperature measurements. Checkout testing was performed in May 1997 with a 22 square inch ASME long radius flow nozzle. Checkout test results will be summarized and compared to the stated design goals.

  2. Evaluation of the control system checkout test at 100% power for Yonggwang Nuclear Power Plant Unit 3

    International Nuclear Information System (INIS)

    Kim, Shin Whan; Lee, Joo Han; Baek, Jong Man; Seo, Jong Tae; Lee, Sang Keun; Kang, In Koo; Ju, Hee Wan; Min, Kyung Soo; Kim, Byung Gon

    1995-01-01

    Control system checkout tests at various powers for Yonggwang Nuclear Power Plant Unit 3(YGN3) were performed to demonstrate the accuracies and proper performances of the control systems of the plant. Tested control systems included the feedwater control system, steam bypass control system, reactor regulation system, control element drive mechanism control system, pressurizer level control system, and pressurizer pressure control system. The measured test data during the control system checkout test at 100% power are evaluated. The test results showed that the control systems of YGN 3 properly control system was simulated by using the LTC code which is the performance analysis code for YGN 3 and 4 design. Comparisons of the predicted results with the measured data confirmed that the feedwater control system controls the steam generator level as designed

  3. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  4. Common data buffer system. [communication with computational equipment utilized in spacecraft operations

    Science.gov (United States)

    Byrne, F. (Inventor)

    1981-01-01

    A high speed common data buffer system is described for providing an interface and communications medium between a plurality of computers utilized in a distributed computer complex forming part of a checkout, command and control system for space vehicles and associated ground support equipment. The system includes the capability for temporarily storing data to be transferred between computers, for transferring a plurality of interrupts between computers, for monitoring and recording these transfers, and for correcting errors incurred in these transfers. Validity checks are made on each transfer and appropriate error notification is given to the computer associated with that transfer.

  5. Nitrogen trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco's facility

  6. Substituting sugar confectionery with fruit and healthy snacks at checkout - a win-win strategy for consumers and food stores?

    DEFF Research Database (Denmark)

    Winkler, Lise L; Christensen, Ulla; Glümer, Charlotte

    2016-01-01

    BACKGROUND: The widespread use of in-store marketing strategies to induce unhealthy impulsive purchases has implications for shopping experience, food choice and possibly adverse health outcomes. The aim of this study was to examine consumer attitudes and evaluate sales effects of a healthy...... short in-store interviews, 11 semi-structured interviews and three focus group interviews). Findings were presented to food retailers and informed the decision to test a healthy checkout intervention. Sugar confectionery at one checkout counter was substituted with fruit and healthy snacking items...... intervention awareness was modest. Most participants believed that the intervention could help other consumers make healthier choices, while fewer expected to be influenced by the intervention themselves. Statistical analyses suggested an intervention effect on sales of carrot snack packs when compared...

  7. Ammunition Peculiar Equipment (APE) 1995, NIR Propellant Analyzer, to MIL-STD-398, Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance

    National Research Council Canada - National Science Library

    2003-01-01

    ... (SJMAC-DEM) to test the Ammunition Peculiar Equipment (APE) 1995 NIR Propellant Analyzer, to MIL-STD-398, "Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance...

  8. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Science.gov (United States)

    2010-10-01

    ... acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under...

  9. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  10. Heavy ion fusion (HIF) impulse injector design, construction, and checkout

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, M. J., LLNL

    1998-05-04

    The following report describes the design, construction, and checkout of a high-voltage (HV) impulser built for the heavy ion fusion (HIF) project. The purpose of this impulser is to provide an adjustable diode voltage source of sufficient quality and level to allow the optimization of beam transport and accelerator sections of HIF. An elegant, low-impedance, high-energy storage capacitor circuit has been selected for this application. A retrofit to the diode region has been included to provide additional beam stability and a controlled rise time. The critical part of this circuit that is common to all candidates is the impedance matching component. The following report provides a description of the implemented circuit, the basic circuit variables for wave shaping, component screening techniques, resulting operating parameters, diode modifications, operating considerations, and fault protection.

  11. Fatores associados ao trabalho de operadores de checkout: investigação das queixas musculoesqueléticas Factors related to the work of checkout operators: research musculoskeletal complaints

    Directory of Open Access Journals (Sweden)

    Clarissa Stefani Teixeira

    2009-01-01

    Full Text Available Este artigo buscou verificar os fatores associados à dor musculoesquelética expressa por operadores de checkout. Participaram do estudo 48 trabalhadores que responderam ao questionário nórdico para identificação da presença de queixas musculoesqueléticas e a um questionário multidimensional com aspectos sociodemográficos de saúde e de condições de trabalho. Para a análise dos dados, foi utilizada a correlação de Spearman para associações, Qui-Quadrado e teste exato de Fisher para testar a homogeneidade das queixas em relação às variáveis socioeconômicas de saúde e de condições do trabalho. Os resultados indicam condições de trabalho não conformes com a NR-17, as quais se relacionam com os sintomas musculoesqueléticos principalmente na região superior das costas. Além disso, os afastamentos por queixas relacionaram-se de forma mais forte aos joelhos e ao exercício de outro trabalho remunerado.This article aims to evaluate the factors associated with complaints of musculoskeletal pain expressed by checkout operators. Participants in the study were 48 employees who responded to the Nordic questionnaire to identify the presence of musculoskeletal complaints, and a multidimensional questionnaire covering aspects of socio-demographics, health and working conditions. For data analysis it used Spearman's correlation to test for associations, chi-square and Fisher's Exact Test to test the homogeneity of complaints related to socioeconomic variables, health and working conditions. The results indicate a lack of compliance with the NR-17 on working conditions, and relate to musculoskeletal symptoms, especially in the upper back. Moreover, job loss due to such complaints related preponderantly to knee problems and the carrying out of other paid work.

  12. Systematic Review of the Check-In, Check-Out Intervention for Students at Risk for Emotional and Behavioral Disorders

    Science.gov (United States)

    Hawken, Leanne S.; Bundock, Kaitlin; Kladis, Kristin; O'Keeffe, Breda; Barret, Courtenay A.

    2014-01-01

    The purpose of this systematic literature review was to summarize outcomes of the Check-in Check-out (CICO) intervention across elementary and secondary settings. Twenty-eight studies utilizing both single subject and group (experimental and quasi-experimental) designs were included in this review. Median effect sizes across the eight group…

  13. Nudging at the checkout counter - A longitudinal study of the effect of a food repositioning nudge on healthy food choice.

    Science.gov (United States)

    Van Gestel, L C; Kroese, F M; De Ridder, D T D

    2018-06-01

    Objective The current study is a longitudinal conceptual replication and aimed to investigate the effect of a food repositioning nudge on healthy food choice in a kiosk. Design During eight weeks, sales data were collected. The former four weeks formed the baseline phase and the latter four weeks formed the nudge phase where healthy food products were repositioned at the checkout counter display, while unhealthy alternatives remained available elsewhere in the store. Main Outcome Measures The main variable of interest was the proportion of healthy food products (selected to be repositioned) sold per day. Also exit interviews were administered to gather individual level data about purchases, and awareness and opinions of the nudge. Results Results showed that the proportion of selected healthy food products in total food sales was higher in all four nudge weeks than in all four baseline weeks. Individual level data showed that more customers had bought a selected healthy food product in the nudge phase and that customers generally approved of the nudge. Conclusion The current study strengthened the empirical evidence base of repositioning healthy food products as an effective and well-accepted nudge.

  14. Multiport riser and flange assemblies acceptance test report

    International Nuclear Information System (INIS)

    Precechtel, D.R.; Schroeder, B.K.

    1994-01-01

    This document presents the results of the acceptance test for the multiport riser (MPR) and multiport flange (MPF) assemblies. The accepted MPR and MPF assemblies will be used in support of the hydrogen mitigation project for double-shell waste tank 241-SY-101 and other related projects. The testing described in this document verifies that the mechanical and interface features are operating as designed and that the unit is ready for field service. The objectives of the acceptance testing were as follows: Basic equipment functions and mechanical interfaces were verified; Installation and removal of equipment were demonstrated to the degree possible; Operation of the decon spray system and all valving was confirmed; and the accumulated leak rate of the MPR and MPF assemblies was determined

  15. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  16. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  17. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    International Nuclear Information System (INIS)

    ANDREWS, J.E.

    2000-01-01

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications

  18. Code Development and Analysis Program: developmental checkout of the BEACON/MOD2A code

    International Nuclear Information System (INIS)

    Ramsthaler, J.A.; Lime, J.F.; Sahota, M.S.

    1978-12-01

    A best-estimate transient containment code, BEACON, is being developed by EG and G Idaho, Inc. for the Nuclear Regulatory Commission's reactor safety research program. This is an advanced, two-dimensional fluid flow code designed to predict temperatures and pressures in a dry PWR containment during a hypothetical loss-of-coolant accident. The most recent version of the code, MOD2A, is presently in the final stages of production prior to being released to the National Energy Software Center. As part of the final code checkout, seven sample problems were selected to be run with BEACON/MOD2A

  19. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  20. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    Energy Technology Data Exchange (ETDEWEB)

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  1. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  2. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  3. Acceptance test procedure for the master equipment list (MEL)database system -- phase I

    International Nuclear Information System (INIS)

    Jech, J.B.

    1997-01-01

    The Waste Remediation System/.../Facilities Configuration Management Integration group has requested development of a system to help resolve many of the difficulties associated with management of master equipment list information. This project has been identified as Master Equipment List (MEL) database system. Further definition is contained in the system requirements specification (SRS), reference 7

  4. Breathing air trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller's location

  5. 47 CFR 80.225 - Requirements for selective calling equipment.

    Science.gov (United States)

    2010-10-01

    ... Commission will not accept new applications (but will continue to process then-pending applications) for certification of non-portable DSC equipment that does not meet the requirements of ITU-R Recommendation M.493-11... Commission will not accept new applications (but will continue to process then-pending applications) for...

  6. 29 CFR 1926.29 - Acceptable certifications.

    Science.gov (United States)

    2010-07-01

    ... Acceptable certifications. (a) Pressure vessels. Current and valid certification by an insurance company or... by an insurance company or regulatory authority attesting to the safe installation, inspection, and... types of pressure vessels and similar equipment are contained in subparts F and O of this part. ...

  7. OEE and equipment effectiveness : an evaluation

    NARCIS (Netherlands)

    Ron, de A.J.; Rooda, J.E.

    2006-01-01

    The overall equipment effectiveness or efficiency (OEE) is a metric that has been accepted in the semiconductor industry. OEE is simple and clear, and standards and guidelines have been developed. Nonetheless, the literature indicates imperfections in applying OEE with regard to the time base and

  8. Acceptance Test Report for the Modular Automation System (MAS) Manufactured by Honeywell Inc

    International Nuclear Information System (INIS)

    ANDERSON, D.L.

    2000-01-01

    This document details the performance of the acceptance test of the Honeywell MAS Control System for equipment to be installed in gloveboxes HA-20MB and HA-211 at a later date. Equipment that was anticipated included 6 stabilization furnaces, only three and their associated equipment were installed

  9. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  10. Acceptance test report for core sample trucks 3 and 4

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-01-01

    The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ''Engineering Practice Guidelines,'' Appendix M, ''Acceptance Test Procedures and Reports.'' Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ''Rock Slinger'' test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted

  11. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  12. Survey on quality control measurements for nuclear medicine imaging equipment in Finland in 2006

    International Nuclear Information System (INIS)

    Korpela, Helinae; Niemelae, Jarkko

    2008-01-01

    Routine quality control (QC) is an essential requirement in nuclear medicine (NM) in order to ensure optimal functioning of equipment. To harmonise the routine QC of NM imaging equipment in Finnish hospital s (planar gamma cameras, SPECT, coincidence gamma cameras, PET), the Radiation and Nuclear Safety Authority (STUK) will publish guidelines on QC in collaboration with several hospital physicists. Recommendations will be provided on routine QC measurements and on the frequency of testing. It is also planned to provide recommendations for the acceptance criteria when assessing different performance parameters for NM imaging equipment. In order to determine what performance parameters of NM equipment are currently measured in hospitals, how frequently they are measured and what acceptance criteria are used, a survey was carried out on the QC of NM equipment in Finland during 2006. (author)

  13. 24 CFR 203.52 - Acceptance of individual residential water purification equipment.

    Science.gov (United States)

    2010-04-01

    ... determined to meet local or state quality standards for drinking water. If neither state nor local standards... acceptable for human consumption. The notification to the mortgagor must identify specific contaminants in... maintaining. I undertstand that the individual water supply is unsafe for consumption unless the system is...

  14. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer's (OEM) specifications. This document reports the results of the testing

  15. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  16. Waste Isolation Pilot Plant Dry Bin-Scale Integrated Systems Checkout Plan

    International Nuclear Information System (INIS)

    1991-04-01

    In order to determine the long-term performance of the Waste Isolation Pilot Plant (WIPP) disposal system, in accordance with the requirements of the US Environmental Protection Agency (EPA) Standard 40 CFR 191, Subpart B, Sections 13 and 15, two performance assessment tests will be conducted. The tests are titled WIPP Bin-Scale Contact Handled (CH) Transuranic (TRU) Waste Tests and WIPP In Situ Alcove CH TRU Waste Tests. These tests are designed to measure the gas generation characteristics of CH TRU waste. Much of the waste will be specially prepared to provide data for a better understanding of the interactions due to differing degradation modes, waste forms, and repository environmental affects. The bin-scale test is designed to emplace nominally 146 bins. The majority of the bins will contain various forms of waste. Eight bins will be used as reference bins and will contain no waste. This checkout plan exercises the systems, operating procedures, and training readiness of personnel to safely carry out those specifically dedicated activities associated with conducting the bin-scale test plan for dry bins only. The plan does not address the entire WIPP facility readiness state. 18 refs., 6 figs., 3 tabs

  17. 10 CFR 603.535 - Value of proposed real property or equipment.

    Science.gov (United States)

    2010-01-01

    ... AGREEMENTS Pre-Award Business Evaluation Cost Sharing § 603.535 Value of proposed real property or equipment. The contracting officer rarely should accept values for cost sharing contributions of real property or...-profit participants. The contracting officer may accept the full value of a donated capital asset if the...

  18. Substituting sugar confectionery with fruit and healthy snacks at checkout – a win-win strategy for consumers and food stores? a study on consumer attitudes and sales effects of a healthy supermarket intervention

    Directory of Open Access Journals (Sweden)

    Lise L. Winkler

    2016-11-01

    Full Text Available Abstract Background The widespread use of in-store marketing strategies to induce unhealthy impulsive purchases has implications for shopping experience, food choice and possibly adverse health outcomes. The aim of this study was to examine consumer attitudes and evaluate sales effects of a healthy checkout supermarket intervention. The study was part of Project Sundhed & Lokalsamfund (Project SoL; a Danish participatory community-based health promotion intervention. Methods Consumer attitudes towards unhealthy snack exposure in supermarkets were examined in a qualitative pre-intervention study (29 short in-store interviews, 11 semi-structured interviews and three focus group interviews. Findings were presented to food retailers and informed the decision to test a healthy checkout intervention. Sugar confectionery at one checkout counter was substituted with fruit and healthy snacking items in four stores for 4 weeks. The intervention was evaluated by 48 short exit interviews on consumer perceptions of the intervention and by linear mixed model analyses of supermarket sales data from the intervention area and a matched control area. Results The qualitative pre-intervention study identified consumer concern and annoyance with placement and promotion of unhealthy snacks in local stores. Store managers were willing to respond to local consumer concern and a healthy checkout intervention was therefore implemented. Exit interviews found positive attitudes towards the intervention, while intervention awareness was modest. Most participants believed that the intervention could help other consumers make healthier choices, while fewer expected to be influenced by the intervention themselves. Statistical analyses suggested an intervention effect on sales of carrot snack packs when compared with sales before the intervention in Bornholm control stores (P < 0.05. No significant intervention effect on sales of other intervention items or sugar

  19. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  20. 78 FR 37760 - Electrical Equipment in Hazardous Locations

    Science.gov (United States)

    2013-06-24

    ... Standardization ISO/IEC Standard 17025 and related IECEx procedures. The ExTL tests the subject equipment and...)/IEC Standard 17025 and related IECEx Operational Documents and Rules of Procedure. Some foreign flag... internationally accepted independent third-party certification system, the IEC System for Certification to...

  1. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  2. Implementation and acceptance of dynamic MLC for IMRT and VMAT

    International Nuclear Information System (INIS)

    Garcia, B.; Marquina, J.; Ramirez, J.; Gonzales, A.

    2014-08-01

    The use of Multi-leaf Collimator (MLC) in Intensity-Modulated Radiation Therapy (IMRT) for dynamic treatment techniques as Volumetric Modulated Arc Therapy (VMAT) makes that the movement controls as the speed of the MLC are quantified by means of an acceptance test. The objective determination of the operation regulations of the radiotherapy equipment requires ideally the establishment of the quantitative relationship among the performance deviations and clinical results or some acceptable substitute. Different protocols exist detailed with parameters and acceptance ranges according to the MLC thickness. In our case the acceptance test was carried out for 120-MLC of Trilogy equipment brand Varian. For all the test were used 300-200 Um for each formed beam lets; source-surface distance (SSD) of 100 cm. 9 acceptance tests were used each one with different purposes like to quantify, synchronization, stability, complexity, precision, positioning, conformity, dynamic movements for the case of dynamic wedges, consecutive moves, among others, for the measurements were used film badges dosimetry (Gafchromic Ebt-3 scanner Epson expression 10000 XL); additionally the results were compared with a diodes arrangement Map-Check 2 brand Sun Nuclear; that consists of 1527 diodes prepared in a field of 32 x 26 cm located at a distance of 1 cm parallel, 0.5 cm diagonally. All the developed tests were inside the acceptance tolerance parameters when comparing the obtained result regarding the badges and the Map-Check was found a discrepancy of 0.01%, what gives a treatment certainty to the moment to impart volumetric dose in dynamic fields to the patients. (Author)

  3. Survey of methods for improving operator acceptance of computerized aids

    International Nuclear Information System (INIS)

    Frey, P.R.; Kisner, R.A.

    1982-04-01

    The success of current attempts to improve the operational performance and safety of nuclear power plants by installing computerized operational aids in the control rooms is dependent, in part, on the operator's attitude toward the aid. Utility experience with process computer systems indicates that problems may already exist with operator acceptance of computerized aids. The growth of the role that computers have in nuclear power plants makes user acceptance of computer technology an important issue for the nuclear industry. The purpose of this report is to draw from the literature factors related to user acceptance of computerized equipment that may also be applicable to the acceptance of computerized aids used in the nuclear power plant control room

  4. Survey of methods for improving operator acceptance of computerized aids

    Energy Technology Data Exchange (ETDEWEB)

    Frey, P. R.; Kisner, R. A.

    1982-04-01

    The success of current attempts to improve the operational performance and safety of nuclear power plants by installing computerized operational aids in the control rooms is dependent, in part, on the operator's attitude toward the aid. Utility experience with process computer systems indicates that problems may already exist with operator acceptance of computerized aids. The growth of the role that computers have in nuclear power plants makes user acceptance of computer technology an important issue for the nuclear industry. The purpose of this report is to draw from the literature factors related to user acceptance of computerized equipment that may also be applicable to the acceptance of computerized aids used in the nuclear power plant control room.

  5. Design review report for modifications to RMCS safety class equipment

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1997-01-01

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable

  6. Design review report for modifications to RMCS safety class equipment

    Energy Technology Data Exchange (ETDEWEB)

    Corbett, J.E.

    1997-05-30

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable.

  7. Synthetic seismic acceleration time-histories and their acceptance criteria

    International Nuclear Information System (INIS)

    Xu Hong

    1996-01-01

    In seismic dynamic response analysis of structures and equipment, time-history analysis is now widely used. The 3-D seismic acceleration time-histories or 3-D seismic displacement time-histories are required in the 3-D seismic dynamic response analysis as the seismic excitation input data. Because of the lack of actual acceleration time-histories for the field where the structures or equipment are installed, the general practice is to use the synthetic seismic acceleration time-histories, which are derived from the design seismic response spectra of the field, as the seismic excitation input data. However, from one specified design response spectrum indefinite solutions of acceleration time-histories can be derived depending on the values of the input parameters. Not all the derived synthetic time-histories can be used as seismic excitation input data. Only those which meet the acceptance criteria can be used. The factors (input parameters), which will affect the time-history solution from a specified seismic response spectrum, and the acceptance criteria are discussed

  8. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  9. Substituting sugar confectionery with fruit and healthy snacks at checkout - a win-win strategy for consumers and food stores? a study on consumer attitudes and sales effects of a healthy supermarket intervention.

    Science.gov (United States)

    Winkler, Lise L; Christensen, Ulla; Glümer, Charlotte; Bloch, Paul; Mikkelsen, Bent E; Wansink, Brian; Toft, Ulla

    2016-11-22

    The widespread use of in-store marketing strategies to induce unhealthy impulsive purchases has implications for shopping experience, food choice and possibly adverse health outcomes. The aim of this study was to examine consumer attitudes and evaluate sales effects of a healthy checkout supermarket intervention. The study was part of Project Sundhed & Lokalsamfund (Project SoL); a Danish participatory community-based health promotion intervention. Consumer attitudes towards unhealthy snack exposure in supermarkets were examined in a qualitative pre-intervention study (29 short in-store interviews, 11 semi-structured interviews and three focus group interviews). Findings were presented to food retailers and informed the decision to test a healthy checkout intervention. Sugar confectionery at one checkout counter was substituted with fruit and healthy snacking items in four stores for 4 weeks. The intervention was evaluated by 48 short exit interviews on consumer perceptions of the intervention and by linear mixed model analyses of supermarket sales data from the intervention area and a matched control area. The qualitative pre-intervention study identified consumer concern and annoyance with placement and promotion of unhealthy snacks in local stores. Store managers were willing to respond to local consumer concern and a healthy checkout intervention was therefore implemented. Exit interviews found positive attitudes towards the intervention, while intervention awareness was modest. Most participants believed that the intervention could help other consumers make healthier choices, while fewer expected to be influenced by the intervention themselves. Statistical analyses suggested an intervention effect on sales of carrot snack packs when compared with sales before the intervention in Bornholm control stores (P branding opportunity for supermarkets, thus representing a win-win strategy for store managers and consumers in the short term. However, the intervention

  10. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    International Nuclear Information System (INIS)

    Barrett, R.A.

    1995-01-01

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP's facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson's facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified

  11. Electromagnetic compatibility for the control and command equipments in nuclear power plants

    International Nuclear Information System (INIS)

    Buisson, J.

    1985-06-01

    Different kinds of electrical interference produce some disturbance on electronic sub-assemblies used to assume the control and the command of nuclear reactors. Following interferences are described: power supply lines perturbations, potential difference between grounding connections, electromagnetic fields. A method is described for testing the EMC of different equipments. The advantages of this method are: no destructive method, usable for testing equipment ''in situ'' in operating conditions on nuclear power plant, usable for testing equipment before operating conditions (acceptance test), level of the testing signals similar to the electrical interference level induced by the electromagnetic environment in normal operating conditions, no particular equipment and installation for test are required [fr

  12. Equipment nonconformance and degradation: Promptly determining operability and establishing corrective action plans

    International Nuclear Information System (INIS)

    Hoxie, C.L.; Cotton, K.R.; Emch, R.L. Jr.

    1992-01-01

    Nine principles for dealing with degraded and nonconforming equipment are presented and some examples are discussed. The distinction between equipment operability (i.e., capability to perform the safety function) and equipment qualification (conformance to all aspects of the current licensing basis, including codes and standards, design criteria, and commitments) is discussed. The concept of finding reasonable assurance of safety for continued plant operation for equipment not covered by technical specifications is also presented. Degraded or nonconforming equipment must be evaluated for its safety impact and for operability. In all cases, degraded or nonconforming conditions must ultimately be resolved, either through prompt corrective action or through some process of showing that the changed state of the plant is acceptable for continued operation, based on 10 CFR 50.59

  13. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  14. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  15. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  16. The point of view from thermal equipment managers; Le point de vue des gestionnaires d`equipements thermiques

    Energy Technology Data Exchange (ETDEWEB)

    Barroyeur, P. [Compagnie General de Chauffe, 59 - Saint Andre Lez Lille (France)

    1997-12-31

    The new French regulations on air pollution and classified installations have increased the technical and economical constraints of thermal equipment managers in the domain of collective space heating and industrial heating. The aim of this paper is to precise the impact of these regulations in particular, on the valorization and elimination of fossil fuel ashes, and on the design, operation and maintenance of combustion installations (maximum acceptable limits of pollutant emissions). (J.S.)

  17. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  18. 40 CFR 205.57-6 - Acceptance and rejection of batches.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Acceptance and rejection of batches. 205.57-6 Section 205.57-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-6...

  19. Human Factors Affecting the Patient's Acceptance of Wireless Biomedical Sensors

    Science.gov (United States)

    Fensli, Rune; Boisen, Egil

    In monitoring arrhythmia, the quality of medical data from the ECG sensors may be enhanced by being based on everyday life situations. Hence, the development of wireless biomedical sensors is of growing interest, both to diagnose the heart patient, as well as to adjust the regimen. However, human factors such as emotional barriers and stigmatization, may affect the patient's behavior while wearing the equipment, which in turn may influence quality of data. The study of human factors and patient acceptance is important both in relation to the development of such equipment, as well as in evaluating the quality of data gathered from the individual patient. In this paper, we highlight some important aspects in patient acceptance by comparing results from a preliminary clinical trial with patients using a wireless ECG sensor for three days out-of-hospital service, to available published results from telehomecare projects, and discuss important aspects to be taken into account in future investigations.

  20. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  1. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  2. Exploring How Peer Communities Enable Lead User Innovations to Become Standard Equipment in the Industry

    DEFF Research Database (Denmark)

    Hienerth, Christoph; Lettl, Christopher

    2011-01-01

    Literature on new product development indicates that on average around 40% of new products fail across different industries (e.g., Crawford, ; Crawford and Di Benedetto, ). Out of those that survive only few become widely accepted standard equipment in the industry (Utterback, ). Literature...... they are developed. It is therefore the aim of this study to shed light on how innovations become widely accepted by large segments of the market and specifically which demand-side forces are at work. An approach suitable for pursuing this objective is to focus on those individuals who are on the leading edge...... with respect to an important market trend (lead users) and their respective peer communities. As little knowledge is available, an explorative case study design is applied, working with cases from two different industries, specifically the medical equipment and sporting equipment industry. A longitudinal...

  3. 46 CFR 159.010-3 - Independent laboratory: Standards for acceptance.

    Science.gov (United States)

    2010-10-01

    ... engaged, as a regular part of its business, in performing inspections and tests that are the same as or... manufacturer; (4) Not be dependent on Coast Guard acceptance under this subchapter to remain in business; and (5) Not advertise or promote the manufacturer's equipment or material that the laboratory inspects...

  4. Project W-320, tank 241-C-106 sluicing acceptance for beneficial use

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    The purpose of this document is to identify the Project W-320 Chiller Documentation required to be turned over from the Projects Organization to Tank Farm Operations as part of the acceptance of the new equipment for beneficial use

  5. System for routine testing of self-contained and airline breathing equipment

    Energy Technology Data Exchange (ETDEWEB)

    McDermott, H.J.; Hermens, G.A.

    1980-07-01

    A system for routine testing of self-contained and airline breathing equipment, developed by Shell Oil Co., for testing breathing equipment at one of its refineries, consists of an 80 psig air supply for airline respirators; a 500-2100 psig air supply for self-contained units; a regulator test system which uses a mannequin head that simulates human inhalation and which tests the ability of the regulator to keep the mask interior at the correct positive pressure; and an exhalation valve test system which identifies a leaky or sticking valve. The testing system has been in use for about 30 mo and has led to increased acceptance of respiratory protective equipment by workers.

  6. 40 CFR 205.57-7 - Acceptance and rejection of batch sequence.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Acceptance and rejection of batch sequence. 205.57-7 Section 205.57-7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205...

  7. 24 CFR 3280.804 - Disconnecting means and branch-circuit protective equipment.

    Science.gov (United States)

    2010-04-01

    ...-2005, National Electrical Code, concerning identification of each disconnecting means and each service... multiple receptacle shall be acceptable when connected to a 20-ampere laundry circuit. (i) When circuit... the blank space. (k) When a home is provided with installed service equipment, a single disconnecting...

  8. Preliminary evaluation of operational parameters in fixed x-ray diagnostics equipment

    International Nuclear Information System (INIS)

    Bacelar, Alexandre; Oliveira, Sandro Soletti de; Streck, Elaine E.; Furtado, Alvaro Porto Alegre; Pinto, Ana Lucia Acosta

    1998-01-01

    In this work they were appraised 22 fixed X-ray diagnostic equipment belonging to three great medical institutions in Porto Alegre - RS, Brazil, with the purpose of demonstrating the importance of the implementation of a Quality Warranty program, advised by a health physicist, in the performance of these equipment. For so some data of alignment and collimation of the beam, peak tube voltage, tube current, transportable charge and exposition time were collected. The results of the tests showed that in only one of the institutions all the equipment remained in operationally acceptable conditions, with relative percent errors below 10%, concerning to the analyzed parameters. This study also showed that the performance of the equipment of the three analyzed institutions is a direct reflex of the maintenance of a Quality Warranty Program, advised by a qualified professional. (author)

  9. Medical image compression and its application to TDIS-FILE equipment

    International Nuclear Information System (INIS)

    Tsubura, Shin-ichi; Nishihara, Eitaro; Iwai, Shunsuke

    1990-01-01

    In order to compress medical images for filing and communication, we have developed a compression algorithm which compresses images with remarkable quality using a high-pass filtering method. Hardware for this compression algorithm was also developed and applied to TDIS (total digital imaging system)-FILE equipment. In the future, hardware based on this algorithm will be developed for various types of diagnostic equipment and PACS. This technique has the following characteristics: (1) significant reduction of artifacts; (2) acceptable quality for clinical evaluation at 15:1 to 20:1 compression ratio; and (3) high-speed processing and compact hardware. (author)

  10. Radiological equipment analyzed by specific developed phantoms and software

    International Nuclear Information System (INIS)

    Soto, M.; Campayo, J. M.; Mayo, P.; Verdu, G.; Rodenas, F.

    2010-10-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  11. Radiological equipment analyzed by specific developed phantoms and software

    Energy Technology Data Exchange (ETDEWEB)

    Soto, M.; Campayo, J. M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Mayo, P. [TITANIA Servicios Tecnologicos SL, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Verdu, G.; Rodenas, F., E-mail: m.soto@lainsa.co [ISIRYIM Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain)

    2010-10-15

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  12. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  13. Offering within-category food swaps to reduce energy density of food purchases: a study using an experimental online supermarket.

    Science.gov (United States)

    Forwood, Suzanna E; Ahern, Amy L; Marteau, Theresa M; Jebb, Susan A

    2015-06-25

    Swaps are often used to encourage healthier food choices, but there is little evidence of their effectiveness. The current study assessed the impact of offering swaps on groceries purchased within a bespoke online supermarket; specifically the objective was to measure the impact on energy density (ED) of food purchases following the offer of lower ED alternatives (a) at point of selection or at checkout, and (b) with or without explicit consent to receive swap prompts. Participants were asked to complete a 12-item shopping task within an online shopping platform, developed for studying food purchasing. 1610 adults were randomly assigned to a no swap control condition or to one of four interventions: consented swaps at selection; consented swaps at checkout; imposed swaps at selection; or imposed swaps at checkout. Each swap presented two lower ED options from the same category as the participant's chosen food. Swap acceptance rate and purchased food ED were the primary outcomes. Of the mean 12.36 (SD 1.26) foods purchased, intervention participants were offered a mean of 4.1 (SD 1.68) swaps, with the potential to reduce the ED of purchased food (effect (95% CI): -83 kJ/100 g (-110 - -56), p = food ED (effect (95% CI): -24 kJ/100 g (4 - -52), p = 0.094). More swaps were accepted when offered at selection than at checkout (OR (95% CI) = 1.224 (1.11 - 1.35), p food ED was unaffected by point of swap or consent, but reduced with number of swaps accepted (effect per swap (95% CI) = -24 kJ/100 g (-35 - -14), p category swaps did not reduce the ED of food purchases reflecting the observation that the use of swaps within an on-line shopping platform offered small potential gains in ED and a minority was accepted.

  14. W-026, acceptance test report manipulator system

    International Nuclear Information System (INIS)

    Watson, T.L.

    1997-01-01

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests

  15. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  16. Technical evaluation of seismic qualification of safety-related equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yang Hui; Park, Heong Gee; Park, Yeong Seok [Univ. of Incheon, Incheon (Korea, Republic of)

    1994-04-15

    This study is purposed to evaluate the technical acceptability of the procedures and techniques of seismic qualifications which were performed for the YGN 3 and 4 safety-related equipment.This study is also targeted to suggest a systematized technical procedure guide for the effective performance and review of the seismic qualification, which reflects the most up-to-date licensing requirements and state-of the-art.

  17. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Not only are acceptance criteria directly related to the design of medical x-ray equipment and quality assurance exercised during its manufacture, but also its performance, safety and reliability must feature in requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. In the UK quality of maintenance services has been considered by one of our Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment in the National Health Service. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes complementary duties of contractors and customers. Radiograph reject analysis has indicated human error outweighs unsatisfactory equipment performance as the reason for rejecting poor radiographs. The use in X-ray departments of the kind of manufacturing quality system used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure. (author)

  18. Optimized FFTF Acceptance Test Program covering Phases III, IV, and V

    International Nuclear Information System (INIS)

    Wykoff, W.R.; Jones, D.H.

    1977-03-01

    A detailed review of Phases III, IV, and V of the FFTF Acceptance Test Program has been completed. The purpose of this review was to formulate that test sequence which not only meets requirements for safe, reliable and useful operation of the plant, but also results in the earliest prudent demonstration of full-power performance. A test sequence based on the underlying assumption that sodium flows into the secondary sodium storage tank (T-44) no later than August 31, 1978, is described in detail. A time-scale which allows extra time to put systems and equipment into operation the first time, debugging, and learning how to operate most effectively has been superimposed on the test sequence. Time is not included for major equipment malfunctions. This test plan provides the basis for coordinating the many and varied activities and interfaces necessary for successful and timely execution of the FFTF Acceptance Test Program. In this report, the need dates have been identified for presently scheduled test articles and standard core components

  19. Effects of battery charge acceptance and battery aging in complete vehicle energy management

    NARCIS (Netherlands)

    Khalik, Z.; Romijn, T.C.J.; Donkers, M.C.F.; Weiland, S.

    2017-01-01

    In this paper, we propose a solution to the complete vehicle energy management problem with battery charge acceptance limitations and battery aging limitations. The problem is solved using distributed optimization for a case study of a hybrid heavy-duty vehicle, equipped with a refrigerated

  20. Human performance for the success of equipment reliability programs

    International Nuclear Information System (INIS)

    Woodcock, J.

    2007-01-01

    Human performance is a critical element of programs directed at equipment reliability. Reliable equipment performance requires broad support from all levels of plant management and throughout all plant departments. Experience at both nuclear power plants and fuel manufacturing plants shows that human performance must be addressed during all phases of program implementation from the beginning through the establishment of a living, on-going process. At the beginning, certain organizational and management actions during the initiation of the program set the stage for successful adoption by station personnel, leading to more rapid benefits. For the long term, equipment reliability is a living process needed throughout the lifetime of a station, a program which must be motivated and measured. Sustained acceptance and participation by the plant personnel is a requirement, and culture is a key ingredient. This paper will provide an overview of key human performance issues to be considered, using the application of the INPO AP-913 Equipment Reliability Guideline as a basis and gives some best practices for training, communicating and implementing programs. The very last part includes ways to tell if the program is effective

  1. Radiographic Co-60 in component of heavy equipment casting

    International Nuclear Information System (INIS)

    Djoli Soembogo, Harun Al Rasyid R dan Namad Sianta

    2016-01-01

    The application of radiography using isotope Co-60 source has been used on component of heavy equipment such as component of heavy equipment casting. Components of heavy equipment casting made through metal casting of carbon steel. This study tried applying digital radiography are using isotope Co-60 sources and using scanning positive film media of Epson V700 for digitization results of conventional radiographic films. This radiography is using film AGFA D7 and Fuji 100 to obtain a contrast medium, medium sensitivity and image quality is good. The purpose radiographic Co-60 at a component of heavy equipment casting is detecting indications of the shape and type casting defects of component of heavy equipment casting thus fit for use. Radiographic test of Co-60 has been carried out on component of heavy equipment casting with single wall single image method and the results of radiographic films digitization using scanning positive film media of Epson V700 with observation parameters casting defects. Time exposure of Co-60 radiation was 10 and 15 minutes hours for metal castings of carbon steel for thickness 20.00-50.00 mm by using activity 30.05 Ci and the perpendicular distance to the source of the film is 820 mm. Scanner positive film results in the form of digital radiography which allow for the transfer of digital data or digital computerized data storage. Radiographic test results on component of heavy equipment casting with single wall single image method produce the parameter casting defect of component of heavy equipment casting in position of critical area is found shrinkage that should be repaired and in position of safety area is not found defect indication so casting defect of component of heavy equipment casting are not acceptable according to standards referenced. (author)

  2. Equipment Obsolescence Analysis and Management Software

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.; Carret, L.; Shaon, S.; Schultz, C.

    2015-07-01

    The procurement engineering resources at Nuclear Power Plants (NPPs) are experiencing increasing backlog for procurement items primarily due to the inability to order the original replacement parts. The level of effort and time required to prepare procurement packages is increasing since the number of obsolete parts are increasing exponentially. Procurement packages for obsolete components and parts are much more complex and take more time to prepare because of the need to perform equivalency evaluations, testing requirements and test acceptance criteria development, commercial grade dedication or equipment qualification, and increasing efforts to verify that no fraudulent or counterfeit parts are procured. This problem will be further compounded when NPPs pursue license renewal and approval for plant-life extension. Advanced planning and advanced knowledge of equipment obsolescence is required to allow for sufficient time to properly procure replacement parts for obsolete items. The uncertain supply chain capability due to obsolescence is a real problem and can cause a risk to reliable plant operations due to the potential for a lack of available spare parts and replacement components to support outages and unplanned component failures. Advanced notification of obsolescence is increasingly more important to ensure that adequate time and planning is scheduled to procure the proper replacement parts. A thorough analysis of Original Equipment Manufacturer (OEM) availability and inventory as well as an analysis of failure rates and usage rates is required to predict critical part needs to allow for early identification of obsolescence issues so that a planned and controlled strategy to qualify replacement equipment can be implemented. (Author)

  3. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Radiological equipment is not purpose-built for each individual application. Thus, not only are acceptance criteria directly related to the design of equipment and the quality assurance exercised during its manufacture, but also the performance, safety and reliability of equipment must feature in the requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. Similarly the continuing reliability of equipment in service is directly related to the quality of maintenance services. This is determined largely by the manner in which such services are procured. In the UK this issue has been considered by one of four Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes the complementary duties of contractors and customers. The use in X-ray departments of the kind of manufacturing quality system that is used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure to patients. (author)

  4. Prototypical spent nuclear nuclear fuel rod consolidation equipment, Phase 2: Final design report: Volume 2, Appendices: Part 1

    International Nuclear Information System (INIS)

    Ciez, A.P.

    1987-01-01

    The purpose of this specification is to establish functional and design requirements for the Prototypical Spent Nuclear Fuel Rod Consolidation System. The Department of Energy-Idaho Operations Office (DOE-ID) is responsible for the implementation of the Prototypic Dry Rod Consolidation Demonstration Project. This program is to develop and demonstrate a fully qualified, licensable, cost-effective, dry spent fuel rod consolidation system by July 1989. The work is divided into four phases as follows: Phase I--Preliminary Design, Phase II--Final Design Option, Phase III--Fabrication and System Checkout Option, and Phase IV--Installation and Hot Demonstration Option. This specification is part of the Phase II effort. The objectives of this specification are to provide functional and design requirements for the Prototypical Spent Nuclear Fuel Rod Consolidation equipment; establish specific tool and subsystem requirements such that the integrated and overall system requirements are satisfied; and establish positioning, envelope and size interface control requirements for each tool or subsystem such that the individual components will interface properly with the overall system design

  5. [Infection prevention check-in and infection prevention check-out to prevent nosocomial infections].

    Science.gov (United States)

    Kramer, A; Schilling, M; Heidecke, C D

    2010-02-01

    A precondition for the success of the prevention of SSI is the complete realisation of the proven anti-infective measures in form of the multi-barrier strategy or the so-called bundles. In daily practice it is important to follow the fixed instructions, i. e., to ensure a high compliance. In much the same way as an airline pilot or co-pilot must examine whether all instruments are functioning before each take-off, a comparable procedure should be developed as a pre-operative control for the observance of all -defined measures by the responsible surgeon and for the post-operative supervision by the patient. For the control of the observance of the defined pre-operative prevention measures, a check list with 12 items was developed, named the "infection prevention check-in". The check list is authorised by the responsible surgeon be-fore each operation. For the surveillance of the general hygiene in the post-operative period the "infection prevention check-out" with 14 items was developed. Thereby the patient is able to evaluate the staff's compliance with the hygienic measures at the time of dismissal. With the introduction of the check-lists a simple means is given to involve both the team of the surgeons and the ward staff, together with the patient, into the infection prophylaxis even more effectively. In order to assess the success of those measures, the influence on the rate of SSI is to be determined prospectively. Georg Thieme Verlag Stuttgart, New York.

  6. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  7. Specific developed phantoms and software to assess radiological equipment image quality

    International Nuclear Information System (INIS)

    Verdu, G.; Rodenas, F.

    2011-01-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be automatized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques, etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (mAs). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (author)

  8. Specific developed phantoms and software to assess radiological equipment image quality

    Energy Technology Data Exchange (ETDEWEB)

    Verdu, G., E-mail: gverdu@iqn.upv.es [Universidad Politecnica de Valencia (Spain). Dept. de Ingenieria Quimica y Nuclear; Mayo, P., E-mail: p.mayo@titaniast.com [TITANIA Servicios Teconologicos, Valencia (Spain); Rodenas, F., E-mail: frodenas@mat.upv.es [Universidad Politecnica de Valencia (Spain). Dept. de Matematica Aplicada; Campayo, J.M., E-mail: j.campayo@lainsa.com [Logistica y Acondicionamientos Industriales S.A.U (LAINSA), Valencia (Spain)

    2011-07-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be automatized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques, etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (mAs). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (author)

  9. User Acceptance of Wrist-Worn Activity Trackers Among Community-Dwelling Older Adults: Mixed Method Study.

    Science.gov (United States)

    Puri, Arjun; Kim, Ben; Nguyen, Olivier; Stolee, Paul; Tung, James; Lee, Joon

    2017-11-15

    Wearable activity trackers are newly emerging technologies with the anticipation for successfully supporting aging-in-place. Consumer-grade wearable activity trackers are increasingly ubiquitous in the market, but the attitudes toward, as well as acceptance and voluntary use of, these trackers in older population are poorly understood. The aim of this study was to assess acceptance and usage of wearable activity trackers in Canadian community-dwelling older adults, using the potentially influential factors as identified in literature and technology acceptance model. A mixed methods design was used. A total of 20 older adults aged 55 years and older were recruited from Southwestern Ontario. Participants used 2 different wearable activity trackers (Xiaomi Mi Band and Microsoft Band) separately for each segment in the crossover design study for 21 days (ie, 42 days total). A questionnaire was developed to capture acceptance and experience at the end of each segment, representing 2 different devices. Semistructured interviews were conducted with 4 participants, and a content analysis was performed. Participants ranged in age from 55 years to 84 years (mean age: 64 years). The Mi Band gained higher levels of acceptance (16/20, 80%) compared with the Microsoft Band (10/20, 50%). The equipment characteristics dimension scored significantly higher for the Mi Band (Ptechnology acceptance (Paccepting of wearable activity trackers, and they had a clear understanding of its value for their lives. Wearable activity trackers were uniquely considered more personal than other types of technologies, thereby the equipment characteristics including comfort, aesthetics, and price had a significant impact on the acceptance. Results indicated that privacy was less of concern for older adults, but it may have stemmed from a lack of understanding of the privacy risks and implications. These findings add to emerging research that investigates acceptance and factors that may influence

  10. Preliminary checkout on the reliability and validity of nuclear and radiation effect psychological effect rating scale (NRERS)

    International Nuclear Information System (INIS)

    Yin Zhongwei; Xie Huaijiang; Yang Chengjun; Yin Xuhui

    2009-01-01

    Objective: To preliminarily evaluate the reliability and validity of the NRPES. Methods: NRPES, SDS and SAS were applied to assess the psychological sate of 352 soldiers, 80 soldiers were randomly selected to determine with NRPES again, which at last contribute to assess the reliability and validity of NRPES. Results: The satisfactory reliability and Cronbach a coefficient respectively were 0.756 and 0.698. The sixth and eighth factor of the principal component analysis are combined together to a new factor, the results indicate the constructive validity is adaptive to the primary design of the questionnaire. NRPES and its 7 factors have a greater significant relation and the correlation coefficient which is from 0.569 ∼ 0.878. There is a great significant correlation between the NRPES, factor x1, x2, x3 and SDS, SAS, the correlation coefficient of which are over 0.5. Conclusion: Though NRPES has some shortcomings,which need to be improved late, NRPES has a better reliability and validity through the preliminary checkout. (authors)

  11. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  12. Biannular Airbreathing Nozzle Rig (BANR) facility checkout and plug nozzle performance test data

    Science.gov (United States)

    Cummings, Chase B.

    2010-09-01

    The motivation for development of a supersonic business jet (SSBJ) platform lies in its ability to create a paradigm shift in the speed and reach of commercial, private, and government travel. A full understanding of the performance capabilities of exhaust nozzle configurations intended for use in potential SSBJ propulsion systems is critical to the design of an aircraft of this type. Purdue University's newly operational Biannular Airbreathing Nozzle Rig (BANR) is a highly capable facility devoted to the testing of subscale nozzles of this type. The high accuracy, six-axis force measurement system and complementary mass flowrate measurement capabilities of the BANR facility make it rather ideally suited for exhaust nozzle performance appraisal. Detailed accounts pertaining to methods utilized in the proper checkout of these diagnostic capabilities are contained herein. Efforts to quantify uncertainties associated with critical BANR test measurements are recounted, as well. Results of a second hot-fire test campaign of a subscale Gulfstream Aerospace Corporation (GAC) axisymmetric, shrouded plug nozzle are presented. Determined test article performance parameters (nozzle thrust efficiencies and discharge coefficients) are compared to those of a previous test campaign and numerical simulations of the experimental set-up. Recently acquired data is compared to published findings pertaining to plug nozzle experiments of similar scale and operating range. Suggestions relating to the future advancement and improvement of the BANR facility are provided. Lessons learned with regards to test operations and calibration procedures are divulged in an attempt to aid future facility users, as well.

  13. Quality assessment of ultrasonographic equipment using an ATS-539 multipurpose phantom

    International Nuclear Information System (INIS)

    Kim, Pyo Nyun; Lim, Joo Won; Kim, Hyun Cheol; Yoon, Young Cheol; Sung, Deuk Je; Moon, Min Hoan; Kim, Jeong Sook; Kim, Jong Chan

    2008-01-01

    To determine the rate of congruence and to standardize assessment of US (ultrasound) phantom images with the use of an ATS-539 multipurpose phantom for US equipment currently utilized in Korea. US phantom images were scanned with a 3.0-5.0 MHz convex transducer and were digitized by use of an analogue-digital converter. Members of a committee with consent evaluated the US phantom images from 108 types of ultrasound equipment. The dead zone, vertical and horizontal measurement, axial/lateral resolution, focal zone, sensitivity, functional resolution and gray scale/dynamic range were evaluated. Congruence or incongruence of ultrasound equipment was determined based on the results of dead zone, axial/lateral resolution and gray scale/dynamic range measurements. Other factors were evaluated for the possibility as criteria with the use of the Mann-Whitney U test and receiver operator characteristic (ROC) curve analysis. The dead zone, axial/lateral resolution and gray scale/dynamic range were 91.7%, 94.4% and 76.9%, respectively, for suitable US equipment. Considering all three factors, 78 types of ultrasound equipment were passed. The congruence rate of focal zone and functional resolution were 62.4% and 69.3% of the US equipment, respectively. Of the US equipment, 72.2% of the equipment was acceptable based on the dead zone, axial/lateral resolution, and gray scale/dynamic range measurement as determined with the use of an ATS-539 phantom. Focal zone and 8 mm-functional resolution can be useful as a standard in the assessment of a US phantom image

  14. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  15. Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit

    Science.gov (United States)

    Gnanavel, C.; Saravanan, R.; Chandrasekaran, M.; Jayakanth, J. J.

    2017-03-01

    Measurements and improvements are very indispensable task at all levels of management. Here some samples are, at operator level: Measuring operating parameters to ensure OEE (Overall Equipment Effectiveness) and measuring Q components performance to ensure quality, at supervisory level: measuring operator’s performance to ensure labour utility at managerial level: production and productivity measurements and at top level capital and capacity utilization. An often accepted statement is “Improvement is impossible without measurement”. Measurements often referred as observation. The case study was conducted at Government Boiler factory in India. The scientific approach followed for indentifying non value added activities. Personalised new equipment designed and installed to achieve productivity improvement of 85% for a day. The new equipment can serve 360o around its axis hence it simplified loading and unloading procedures as well as reduce their times and ensured effective space and time.

  16. EM-18-2008 regulation. Essential requirements for the registration of medical equipment

    International Nuclear Information System (INIS)

    2015-01-01

    This rule lays down additional rules for the evaluation and the State Control of Medical Equipment provisions. Medical equipment must be designed and constructed so that they are used under the conditions and for the intended purpose and shall, where applicable, by virtue of the technical knowledge, experience, education or training of users, do not compromise the clinical condition or safety of patients, or the safety and health of users or, where applicable, other persons, assuming that any risks that may be associated with their use constitute acceptable risks versus the benefits for the patient and is compatible with a high level of protection of health and safety.

  17. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Science.gov (United States)

    2010-10-01

    ... and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a) From...

  18. Anesthesia machine checkout and room setup: a randomized, single-blind, comparison of two teaching modalities.

    Science.gov (United States)

    Spofford, Christina M; Bayman, Emine O; Szeluga, Debra J; From, Robert P

    2012-01-01

    Novel methods for teaching are needed to enhance the efficiency of academic anesthesia departments as well as provide approaches to learning that are aligned with current trends and advances in technology. A video was produced that taught the key elements of anesthesia machine checkout and room set up. Novice learners were randomly assigned to receive either the new video format or traditional lecture-based format for this topic during their regularly scheduled lecture series. Primary outcome was the difference in written examination score before and after teaching between the two groups. Secondary outcome was the satisfaction score of the trainees in the two groups. Forty-two students assigned to the video group and 36 students assigned to the lecture group completed the study. Students in each group similar interest in anesthesia, pre-test scores, post-test scores, and final exam scores. The median posttest to pretest difference was greater in the video groups (3.5 (3.0-5.0) vs 2.5 (2.0-3.0), for video and lecture groups respectively, p 0.002). Despite improved test scores, students reported higher satisfaction the traditional, lecture-based format (22.0 (18.0-24.0) vs 24.0 (20.0-28.0), for video and lecture groups respectively, p students in the video-based teaching group, however students rated traditional, live lectures higher than newer video-based teaching.

  19. Response of equipment in nuclear power plants to airplane crash

    International Nuclear Information System (INIS)

    Schalk, M.; Woelfel, H.

    1975-01-01

    The question has been posed concerning the effect of airplane crash on the safety of the equipment (pipes, vessels, etc.) mounted on the floors and walls inside the outer structure. This equipment is set into vibration by the crash-induced shaking of the outer building; the resulting stresses may be quite appreciable. The following questions arise: a) how large are these stresses. Can they, for example, be larger than the stresses produced by earthquake loading. b) What are the significant response parameters. c) Which methods of analysis and design criteria are reasonable. To what extent is it possible to apply the techniques which have become generally accepted for earthquake loading. The paper presents a preliminary answer to these questions pending further work in this area. (orig./HP) [de

  20. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  1. Firing Room Remote Application Software Development

    Science.gov (United States)

    Liu, Kan

    2015-01-01

    The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.

  2. Principles of commercially available pretreatment and feeding equipment for baled biomass

    Energy Technology Data Exchange (ETDEWEB)

    Koch, T. [Thomas Koch Energi, Vanloese (Denmark); Hummelshoej, R.M. [COWIconsult, Lyngby (Denmark)

    1993-12-31

    During the last 15 years, there has been a growing interest in utilizing waste biomass for energy production in Denmark. Since 1990, it has been unlawful to burn surplus straw on open land. Before the year 2000, it is intended to utilize most of the 2--3 million tons of surplus straw as an energy resource. The type of plants that were built in the beginning were combustion plants for district heating. The feeding equipment for these plants has been developed to an acceptable standard. Later, combustion plants for combined heat and power production based on a steam turbine were introduced. This type of plant demands a much greater continuity in the fuel flow, and the consequences of minor discontinuities are to be dropped from the grid. Gasification and pyrolysis demands a high sealing ability of the feeding equipment, because of the explosive and poisonous gas in the plant and a need for a very high continuity in the fuel feed. The first plants were built with the equipment and experiences from the farming industries, which have a long tradition in working with biomass-handling. The experiences gained with this type of equipment were not very promising, and in the early eighties, a more industrial type of biomass-handling equipment was developed. This paper presents the principles of the heavy-duty biomass pretreatment and feeding equipment that was commercially available in Denmark in May, 1993.

  3. Quality assurance applied to mammographic equipments using phantoms and software for its evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Mayo, Patricia, E-mail: p.mayo@titaniast.co [Titania Servicios Tecnologicos S.L., Grupo Dominguis, Apartado 46015, Valencia (Spain); Rodenas, Francisco [Departamento de Matematica Aplicada, Universidad Politecnica de Valencia, Apartado 46022, Valencia (Spain); Manuel Campayo, Juan [Hospital Clinico Universitario de Valencia, Avda. Blasco Ibanez, Apartado 46017, Valencia (Spain); Verdu, Gumersido [Departamento de Ingenieria Quimica y Nuclear, Universidad Politecnica de Valencia, Apartado 46022, Valencia (Spain)

    2010-07-21

    The image quality assessment in radiographic equipments is a very important item for a complete quality control of the radiographic image chain. The periodic evaluation of the radiographic image quality must guarantee the constancy of this quality to carry out a suitable diagnosis. Mammographic phantom images are usually used to study the quality of images obtained by determined mammographic equipment. The digital image treatment techniques allow to carry out an automatic analysis of the phantom image. In this work we apply some techniques of digital image processing to analyze in an automatic way the image quality of mammographic phantoms, namely CIRS SP01 and RACON for different varying conditions of the mammographic equipment. The CIRS SP01 phantom is usually used in analogic mammographic equipments and the RACON phantom has been specifically developed by authors to be applied to acceptance and constancy tests of the image quality in digital radiographic equipments following recommendations of international associations. The purpose of this work consists in analyzing the image quality for both phantoms by means of an automatic software utility. This analysis allows us to study the functioning of the image chain of the mammographic system in an objective way, so an abnormal functioning of the radiographic equipment might be detected.

  4. Quality assurance applied to mammographic equipments using phantoms and software for its evaluation

    International Nuclear Information System (INIS)

    Mayo, Patricia; Rodenas, Francisco; Manuel Campayo, Juan; Verdu, Gumersido

    2010-01-01

    The image quality assessment in radiographic equipments is a very important item for a complete quality control of the radiographic image chain. The periodic evaluation of the radiographic image quality must guarantee the constancy of this quality to carry out a suitable diagnosis. Mammographic phantom images are usually used to study the quality of images obtained by determined mammographic equipment. The digital image treatment techniques allow to carry out an automatic analysis of the phantom image. In this work we apply some techniques of digital image processing to analyze in an automatic way the image quality of mammographic phantoms, namely CIRS SP01 and RACON for different varying conditions of the mammographic equipment. The CIRS SP01 phantom is usually used in analogic mammographic equipments and the RACON phantom has been specifically developed by authors to be applied to acceptance and constancy tests of the image quality in digital radiographic equipments following recommendations of international associations. The purpose of this work consists in analyzing the image quality for both phantoms by means of an automatic software utility. This analysis allows us to study the functioning of the image chain of the mammographic system in an objective way, so an abnormal functioning of the radiographic equipment might be detected.

  5. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  6. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  7. STS-31 crew training: firefighting, food tasting, EVA prep and post

    Science.gov (United States)

    1990-03-01

    The Space Shuttle crew is shown lighting a pond of gasoline and then performing firefighting tasks. The crew is also shown tasting food including lemonade, chicken casserole, and tortillas, and performing extravehicular activity (EVA) equipment checkouts in the CCT middeck and airlock.

  8. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  9. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  10. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  11. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  12. Development of floor design response spectra for seismic design of floor-supported equipment or components, Revision 1, February 1978

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This guide presents an acceptable method for developing two horizontal and one vertical floor design response spectra at various floor or other equipment-support locations from the time-history motions resulting from the dynamic analysis of the supporting structure. These floor design response spectra are used in the dynamic analysis of systems or equipment supported at various locations of the supporting structure. Consulation has been provided by the Advisory Committee on Reactor Safeguards

  13. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  14. Acceptability of picture archiving and communication system (PACS) among hospital healthcare personnel based on a unified theory of acceptance and use of technology.

    Science.gov (United States)

    Ahmadi, Maryam; Mehrabi, Nahid; Sheikhtaheri, Abbas; Sadeghi, Mojtaba

    2017-09-01

    The picture archiving and communication system (PACS) is a healthcare system technology which manages medical images and integrates equipment through a network. There are some theories about the use and acceptance of technology by people to describe the behavior and attitudes of end users towards information technologies. We investigated the influential factors on users' acceptance of PACS in the military hospitals of Tehran. In this applied analytical and cross-sectional study, 151 healthcare employees of military hospitals who had experience in using the PACS system were investigated. Participants were selected by census. The following variables were considered: performance expectancy, efforts expectancy, social influence, facilitating conditions and behavioral intention. Data were gathered using a questionnaire. Its validity and reliability were approved by a panel of experts and was piloted with 30 hospital healthcare staff (Cronbach's alpha =0.91). Spearman correlation coefficient and multiple linear regression analysis were used in analyzing the data. Expected performance, efforts expectancy, social impact and facilitating conditions had a significant relationship with behavioral intention. The multiple regression analysis indicated that only performance expectancy can predict the user's behavioral intentions to use PACS technology. Performance and effort expectancies are quite influential in accepting the use of PACS in hospitals. All healthcare personnel should become aware that using such technology is necessary in a hospital. Knowing the influencing factors that affect the acceptance of using new technology can help in improving its use, especially in a healthcare system. This can improve the offered healthcare services' quality.

  15. A Study on Performance and Safety Tests of Electrosurgical Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2016-09-01

    Full Text Available Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  16. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  17. Plasma atomic layer etching using conventional plasma equipment

    International Nuclear Information System (INIS)

    Agarwal, Ankur; Kushner, Mark J.

    2009-01-01

    The decrease in feature sizes in microelectronics fabrication will soon require plasma etching processes having atomic layer resolution. The basis of plasma atomic layer etching (PALE) is forming a layer of passivation that allows the underlying substrate material to be etched with lower activation energy than in the absence of the passivation. The subsequent removal of the passivation with carefully tailored activation energy then removes a single layer of the underlying material. If these goals are met, the process is self-limiting. A challenge of PALE is the high cost of specialized equipment and slow processing speed. In this work, results from a computational investigation of PALE will be discussed with the goal of demonstrating the potential of using conventional plasma etching equipment having acceptable processing speeds. Results will be discussed using inductively coupled and magnetically enhanced capacitively coupled plasmas in which nonsinusoidal waveforms are used to regulate ion energies to optimize the passivation and etch steps. This strategy may also enable the use of a single gas mixture, as opposed to changing gas mixtures between steps

  18. Implementation and acceptance of dynamic MLC for IMRT and VMAT; Implementacion y aceptacion de MLC dinamicos para IMRT y VMAT

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, B.; Marquina, J.; Ramirez, J.; Gonzales, A., E-mail: bertha.garcia@aliada.com.pe [ALIADA, Oncologia Integral, Av. Jose Galvez Barrenechea 1044, San Isidro, Lima 27 (Peru)

    2014-08-15

    The use of Multi-leaf Collimator (MLC) in Intensity-Modulated Radiation Therapy (IMRT) for dynamic treatment techniques as Volumetric Modulated Arc Therapy (VMAT) makes that the movement controls as the speed of the MLC are quantified by means of an acceptance test. The objective determination of the operation regulations of the radiotherapy equipment requires ideally the establishment of the quantitative relationship among the performance deviations and clinical results or some acceptable substitute. Different protocols exist detailed with parameters and acceptance ranges according to the MLC thickness. In our case the acceptance test was carried out for 120-MLC of Trilogy equipment brand Varian. For all the test were used 300-200 Um for each formed beam lets; source-surface distance (SSD) of 100 cm. 9 acceptance tests were used each one with different purposes like to quantify, synchronization, stability, complexity, precision, positioning, conformity, dynamic movements for the case of dynamic wedges, consecutive moves, among others, for the measurements were used film badges dosimetry (Gafchromic Ebt-3 scanner Epson expression 10000 XL); additionally the results were compared with a diodes arrangement Map-Check 2 brand Sun Nuclear; that consists of 1527 diodes prepared in a field of 32 x 26 cm located at a distance of 1 cm parallel, 0.5 cm diagonally. All the developed tests were inside the acceptance tolerance parameters when comparing the obtained result regarding the badges and the Map-Check was found a discrepancy of 0.01%, what gives a treatment certainty to the moment to impart volumetric dose in dynamic fields to the patients. (Author)

  19. Assessment of lightning impact frequency for process equipment

    International Nuclear Information System (INIS)

    Necci, Amos; Antonioni, Giacomo; Cozzani, Valerio; Krausmann, Elisabeth; Borghetti, Alberto; Nucci, Carlo Alberto

    2014-01-01

    Fires and explosions triggered by lightning strikes are among the most frequent Natech scenarios affecting the chemical and process industry. Although lightning hazard is well known, well accepted quantitative procedures to assess the contribution of accidents caused by lightning to industrial risk are still lacking. In the present study, a quantitative methodology for the assessment of the expected frequency of lightning capture by process equipment is presented. A specific model, based on Monte Carlo simulations, was developed to assess the capture frequency of lightning for equipment with a given geometry. The model allows the assessment of lay-out effects and the reduction of the capture probability due to the presence of other structures or equipment items. The results of the Monte Carlo simulations were also used to develop a simplified cell method allowing a straightforward assessment of the lightning impact probability in a quantitative risk assessment framework. The developed approach allows an in-depth analysis of the hazard due to lightning impact by identifying equipment items with the highest expected frequency of lightning impacts in a given lay-out. The model thus supplies useful data to approach the assessment of the quantitative contribution of lightning-triggered accidents to industrial risk. - Highlights: • A specific approach to storage tank lightning impact frequency calculation was developed. • The approach is suitable for the quantitative assessment of industrial risk due to lightning. • The models developed provide lightning capture frequency based on tank geometry. • Lay-out effects due to nearby structures are also accounted. • Capture frequencies may be as high as 10 −1 events/year for standalone unprotected tanks

  20. Bridging the Gap between Social Acceptance and Ethical Acceptability.

    Science.gov (United States)

    Taebi, Behnam

    2017-10-01

    New technology brings great benefits, but it can also create new and significant risks. When evaluating those risks in policymaking, there is a tendency to focus on social acceptance. By solely focusing on social acceptance, we could, however, overlook important ethical aspects of technological risk, particularly when we evaluate technologies with transnational and intergenerational risks. I argue that good governance of risky technology requires analyzing both social acceptance and ethical acceptability. Conceptually, these two notions are mostly complementary. Social acceptance studies are not capable of sufficiently capturing all the morally relevant features of risky technologies; ethical analyses do not typically include stakeholders' opinions, and they therefore lack the relevant empirical input for a thorough ethical evaluation. Only when carried out in conjunction are these two types of analysis relevant to national and international governance of risky technology. I discuss the Rawlsian wide reflective equilibrium as a method for marrying social acceptance and ethical acceptability. Although the rationale of my argument is broadly applicable, I will examine the case of multinational nuclear waste repositories in particular. This example will show how ethical issues may be overlooked if we focus only on social acceptance, and will provide a test case for demonstrating how the wide reflective equilibrium can help to bridge the proverbial acceptance-acceptability gap. © 2016 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.

  1. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR (Integral Fast Reactor) program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. (author)

  2. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. 5 refs., 4 figs

  3. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1997-01-01

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack of installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report

  4. Brief scales to assess physical activity and sedentary equipment in the home

    Directory of Open Access Journals (Sweden)

    Durant Nefertiti

    2010-01-01

    Full Text Available Abstract Background Sedentary behaviors such as TV viewing are associated with childhood obesity, while physical activity promotes healthy weight. The role of the home environment in shaping these behaviors among youth is poorly understood. The study purpose was to examine the reliability of brief parental proxy-report and adolescent self-report measures of electronic equipment and physical activity equipment in the home and to assess the construct validity of these scales by examining their relationship to physical activity, sedentary behavior, and weight status of children and adolescents. Methods Participants were adolescents (n = 189; mean age = 14.6, parents of adolescents (n = 171; mean age = 45.0, and parents of younger children (n = 116; parents mean age = 39.6; children's mean age = 8.3 who completed two surveys approximately one month apart. Measures included a 21-item electronic equipment scale (to assess sedentary behavior facilitators in the home, in the child or adolescent's bedroom, and portable electronics and a 14-item home physical activity equipment scale. Home environment factors were examined as correlates of children's and adolescents' physical activity, sedentary behavior, and weight status after adjusting for child age, sex, race/ethnicity, household income, and number of children in the home. Results Most scales had acceptable test-retest reliability (intraclass correlations were .54 - .92. Parent and adolescent reports were correlated. Electronic equipment in adolescents' bedrooms was positively related to sedentary behavior. Activity equipment in the home was inversely associated with television time in adolescents and children, and positively correlated with adolescents' physical activity. Children's BMI z-score was positively associated with having a television in their bedroom. Conclusions The measures of home electronic equipment and activity equipment were similarly reliable when reported by parents and by

  5. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  6. Fluidized bed incineration system for U.S. Department of Energy Defense Waste, January--June 1978

    International Nuclear Information System (INIS)

    Anderson, D.L.; Bell, B.A.; Feng, P.K.; Meyer, F.G.

    1978-12-01

    A fluidized bed incineration facility has been designed for installation at the Rocky Flats Plant to develop and demonstrate the process for the combustion of transuranic waste. The unit capacity will be about 82 kg/hour of combustible waste. The combustion process will utilize in situ neutralization of acid gases generated in the process. The equipment design is based on data generated on a pilot scale unit and represents a scale-up factor of nine. Equipment installation was completed on April 30, 1978. Equipment checkout and startup is in progress

  7. External quality audit programmes for radiotherapy dosimetry and equipment

    International Nuclear Information System (INIS)

    Thwaites, D.I.

    1997-01-01

    It is widely accepted that individual radiotherapy centres should have in place a comprehensive quality assurance programme on all the necessary steps for the delivery of safe accurate treatment. As regards the performance of radiotherapy equipment and dosimetry, the most widely used process of external checking has been dosimetry intercomparison, comparing independently measured doses to locally stated doses in a variety of conditions. These have been at a number of different levels: from basic beam calibration; up to and including exercises employing anatomic or pseudo-anatomic phantoms and incorporating tests of treatment planning equipment and procedures. Some of these have been one-off exercises, whilst others are continuing, or have given rise to on-going quality audit programmes on a national (or wider) basis. A number of these have evolved, or are evolving, into audits which include external checking of the achievement of standards in performance of treatment equipment, as well as in the dosimetry in each institution involved. The principles and methodologies of the various types of external checking programmes for treatment equipment and dosimetry are reviewed, covering the experimental approaches and the tolerances applied. What is included in a given programme will, of necessity, depend on the resources available and the purpose of the exercise. Methods and tolerances must be matched to endpoint. Tolerance levels must take into account the experimental uncertainties of the measurement methods employed. Finally, external audit can only be used to complement, and in conjunction with, institutional quality assurance programmes and not as a substitute for them

  8. Possible alternatives for diesel powered mobile equipment for the conditions of deep mines

    Energy Technology Data Exchange (ETDEWEB)

    Paraszczak, J.; Kotersi, O [Laval Univ., Quebec City, PQ (Canada). Dept. of Mining, Metallurgical and Materials Engineering

    2008-07-01

    The challenges associated with mining at considerable depths were discussed. Mines such as Kidd Creek, LaRonde and Creighton are deeper than 2500 m. High rock temperature is among the challenges that operators face in such conditions. Conventional diesel powered load-hauling equipment constitute an additional source of heat and noxious gases. As such, more intense ventilation is needed in order to keep ambient temperature and air quality at a level that is acceptable for human workers. This paper examined possible alternatives for diesel powered equipment, including those that are commercially available as well as those that are underdevelopment or in the prototype stage. The equipment was reviewed with reference to the required infrastructure, stage of technology development and progress. The flexibility, practicality and economic viability of the equipment was also investigated. The potential for its use in deep Canadian mines was discussed along with the most promising drive alternatives for vehicles designed for deep mine operations. Electric drives have proven to be effective in many mining applications since they have significant advantages over diesel drives. The characteristics of cable powered equipment, trolley-wire powered equipment, and battery powered equipment were described. The key advantages and disadvantages of hybrid diesel electric equipment were also reviewed along with the viability of power plants based on the use of hydrogen. The principle types of hydrogen power plants include hydrogen combustion engines; HY-Drive systems and fuel cells. It was concluded that although there is no viable alternative for diesel engines at present, Canadian mining companies operating at great depths have made significant progress in these fields and remain among the leaders in mining innovation. 17 refs.

  9. Discussion on unpacking inspection of imported civil nuclear safety equipment

    International Nuclear Information System (INIS)

    Li Chan; Zhang Wenguang; Li Maolin; Li Shixin; Jin Gang; Yao Yuan

    2014-01-01

    This paper introduces the purpose, contents, process and requirements of unpacking inspection which is the second stage of safety inspection of imported civil nuclear safety equipment, expresses review key points on application documents of unpacking inspection, processes of witness on-the-spot before unpacking inspection outside the civil nuclear facilities by the test agency, discusses understanding of unpacking inspection, supervision of manufacture, inspection prior to shipment, supervision of loading and acceptance by the unit operating civil nuclear facilities, reports on unpacking inspection. Some suggestions on reinforcing the unpacking inspection in China are concerned. (authors)

  10. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  11. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  12. Process acceptance and adjustment techniques for Swiss automatic screw machine parts. Final report

    International Nuclear Information System (INIS)

    Robb, J.M.

    1976-01-01

    Product tolerance requirements for small, cylindrical, piece parts produced on swiss automatic screw machines have progressed to the reliability limits of inspection equipment. The miniature size, configuration, and tolerance requirements (plus or minus 0.0001 in.) (0.00254 mm) of these parts preclude the use of screening techniques to accept product or adjust processes during setup and production runs; therefore, existing means of product acceptance and process adjustment must be refined or new techniques must be developed. The purpose of this endeavor has been to determine benefits gained through the implementation of a process acceptance technique (PAT) to swiss automatic screw machine processes. PAT is a statistical approach developed for the purpose of accepting product and centering processes for parts produced by selected, controlled processes. Through this endeavor a determination has been made of the conditions under which PAT can benefit a controlled process and some specific types of screw machine processes upon which PAT could be applied. However, it was also determined that PAT, if used indiscriminately, may become a record keeping burden when applied to more than one dimension at a given machining operation

  13. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  14. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  15. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  16. Plasma Hazards and Acceptance for International Space Station Extravehicular Activities

    Science.gov (United States)

    Patton, Thomas

    2010-09-01

    Extravehicular activity(EVA) is accepted by NASA and other space faring agencies as a necessary risk in order to build and maintain a safe and efficient laboratory in space. EVAs are used for standard construction and as contingency operations to repair critical equipment for vehicle sustainability and safety of the entire crew in the habitable volume. There are many hazards that are assessed for even the most mundane EVA for astronauts, and the vast majority of these are adequately controlled per the rules of the International Space Station Program. The need for EVA repair and construction has driven acceptance of a possible catastrophic hazard to the EVA crewmember which cannot currently be controlled adequately. That hazard is electrical shock from the very environment in which they work. This paper describes the environment, causes and contributors to the shock of EVA crewmembers attributed to the ionospheric plasma environment in low Earth orbit. It will detail the hazard history, and acceptance process for the risk associated with these hazards that give assurance to a safe EVA. In addition to the hazard acceptance process this paper will explore other factors that go into the decision to accept a risk including criticality of task, hardware design and capability, and the probability of hazard occurrence. Also included will be the required interaction between organizations at NASA(EVA Office, Environments, Engineering, Mission Operations, Safety) in order to build and eventually gain adequate acceptance rationale for a hazard of this kind. During the course of the discussion, all current methods of mitigating the hazard will be identified. This paper will capture the history of the plasma hazard analysis and processes used by the International Space Station Program to formally assess and qualify the risk. The paper will discuss steps that have been taken to identify and perform required analysis of the floating potential shock hazard from the ISS environment

  17. Measurement system performance during cold checkout runs at the BNFP

    International Nuclear Information System (INIS)

    Ehinger, M.H.; Crawford, J.M.

    1978-01-01

    The measurement systems in a complex nuclear fuel plant such as the Barnwell Nuclear Fuel Plant rely on capabilities to remotely measure solution quantities and determine the nuclear material content of these solutions. During recent testing activities using natural uranium, a major objective of the NMC group was to demonstrate these solution measurement capabilities. Installed measurement systems at the BNFP use the most recent innovations in measurement equipment and techniques for remote solution measurement. This paper presents the measurement methods and results of the tests and evaluations. 6 figures

  18. Equipment-independent reference values for dopamine transporter imaging with 123I-FP-CIT

    International Nuclear Information System (INIS)

    Koch, W.; Hornung, J.; Poepperl, G.; Tatsch, K.; Hamann, C.

    2007-01-01

    Aim: Reliable reference values are helpful to interpret and compare the results of dopamine transporter imaging with SPECT. Since semi-quantitative reference values cannot be easily transferred between imaging equipments, this study aimed to establish equipment independent normal values for the true striatal binding of 123 I-FP-CIT. Patients, methods: Specific striatal FP-CIT binding of 6 healthy volunteers and 26 patients with essential tremor were used to generate a reference range by applying an equipment specific resolution dependent factor to compensate for recovery effects. This factor has been determined previously by a series of standardized phantom measurements of an anthropomorphic basal ganglia phantom. Herewith, the resulting DAT binding values represent the expected true specific binding in the striatum. Results: On average, true specific striatal binding was 5.83 ± 0.96 in healthy controls, 5.25 ± 0.67 in patients with essential tremor and 5.36 ± 0.75 in the entire study cohort. Conclusion: These preliminary results may serve as a basis for the generation of a generally accepted equipment independent reference range for dopamine transporter imaging with 123 I-FP-CIT. By a simple phantom measurement that can be accomplished within one day factors related to specific imaging equipment and processing can be corrected for, resulting in specific binding values which may enable a more standardized interpretation of dopamine transporter scans. (orig.)

  19. The revision of RP 91 on criteria for acceptability of radiological (including radiotherapy) and nuclear medicine installations

    International Nuclear Information System (INIS)

    Faulkner, K.; Malone, J. F.; Christofides, S.; Lillicrap, S.; Horton, P.

    2013-01-01

    In 1997 the European Commission published Radiation Protection 91: 'Criteria for acceptability of radiological (including radiotherapy) and nuclear medicine installations'(1). This document specified the minimum criteria for acceptability. It has been used to this effect in legislation, codes of practice and by individual professionals. In a single document, it defined a level of performance at which remedial action was required. The document specified a series of parameters which characterised equipment performance and acceptable levels of performance. In its time it proved to be a useful document which was applied in member states to various degrees. Since the publication of Report 91 in 1997(1), a series of weaknesses emerged over time. Development of new radiological systems and technologies, as well as improvements in traditional technologies, has created circumstances where the acceptability criteria were in need of review. These weaknesses were recognised by the European Commission and a tender for its revision was issued. The criteria were developed by a team drawn from a broad range of backgrounds including hospitals, industry, government bodies, regulators and standardisation organisations. Representatives were mainly from Europe, but individuals from the American Association of Physicists in Medicine and International Atomic Energy Agency were included in the drafting process. This study describes the process employed in developing the revised document and the consultation process involved. One of the major difficulties the revision team encountered was related to an understanding of the actual meaning of the EC Directive(2). The view taken by the revision team was that Article 8, paragraph 3 places responsibilities on both the holders of radiological equipment and competent authorities. The acceptability criteria have been produced consistent with the European Commission's Medical Exposures Directive(2), which requires that patient exposures are

  20. IFR fuel cycle

    International Nuclear Information System (INIS)

    Battles, J.E.; Miller, W.E.; Lineberry, M.J.; Phipps, R.D.

    1992-01-01

    The next major milestone of the IFR program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase, which includes completion of facility modifications and installation and cold checkout of process equipment. This paper reviews the development of the electrorefining pyroprocess, the design and construction of the facility for the hot demonstration, the design and fabrication of the equipment, and the schedule and initial plan for its operation

  1. The difficult business model for mask equipment makers and mask infrastructure development support from consortia and governments

    Science.gov (United States)

    Hector, Scott

    2005-11-01

    The extension of optical projection lithography through immersion to patterning features with half pitch face the challenge of being profitable in the small market for mask equipment while encountering significant R&D expenses to bring new generations of mask fabrication equipment to market. The total available market for patterned masks is estimated to be $2.5B to $2.9B per year. The patterned mask market is about 20% of the market size for lithography equipment and materials. The total available market for mask-making equipment is estimated to be about $800M per year. The largest R&D affordability issue arises for the makers of equipment for fabricating masks where total available sales are typically less than ten units per year. SEMATECH has used discounted cash flow models to predict the affordable R&D while maintaining industry accepted internal rates of return. The results have been compared to estimates of the total R&D cost to bring a new generation of mask equipment to market for various types of tools. The analysis revealed that affordability of the required R&D is a significant problem for many suppliers of mask-making equipment. Consortia such as SEMATECH and Selete have played an important role in cost sharing selected mask equipment and material development projects. Governments in the United States, in Europe and in Japan have also helped equipment suppliers with support for R&D. This paper summarizes the challenging business model for mask equipment suppliers and highlight government support for mask equipment and materials development.

  2. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  3. Consumer views on the acceptance of irradiated food

    International Nuclear Information System (INIS)

    Taylor, J.

    1992-01-01

    Scientists, technologists and equipment manufacturers do not a successful process make. And yet to many - outsiders, consumers and food industry alike -these three groups increasingly appear to believe they are indeed all that is necessary to ensure marketplace acceptance and utilisation. The reality is that the food irradiation industry is increasingly facing the risk of becoming irrelevant. The potential of this new technology is undoubtedly immense and the sheer scientific creativity of it has the ring of the 21st Century. Unfortunately the methods used to communicate the positive benefits of the technology are reminiscent of the 1950's. Unless the food irradiation industry comes to terms with this it may well have wasted 4 decades of research and development work. (orig.) [de

  4. Learner-Centered Instruction (LCI): Volume IV, The Simulated Maintenance Task Environment (SMTE): A Job Specific Simulator.

    Science.gov (United States)

    Rifkin, Kenneth I.; And Others

    The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…

  5. Responsible technology acceptance

    DEFF Research Database (Denmark)

    Toft, Madeleine Broman; Schuitema, Geertje; Thøgersen, John

    2014-01-01

    As a response to climate change and the desire to gain independence from imported fossil fuels, there is a pressure to increase the proportion of electricity from renewable sources which is one of the reasons why electricity grids are currently being turned into Smart Grids. In this paper, we focus...... on private consumers’ acceptance of having Smart Grid technology installed in their home. We analyse acceptance in a combined framework of the Technology Acceptance Model and the Norm Activation Model. We propose that individuals are only likely to accept Smart Grid technology if they assess usefulness...... in terms of a positive impact for society and the environment. Therefore, we expect that Smart Grid technology acceptance can be better explained when the well-known technology acceptance parameters included in the Technology Acceptance Model are supplemented by moral norms as suggested by the Norm...

  6. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  7. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  8. Acceptance of Others, Feeling of Being Accepted and Striving for Being Accepted Among the Representatives of Different Kinds of Occupations

    Directory of Open Access Journals (Sweden)

    Gergana Stanoeva

    2012-05-01

    Full Text Available This paper deals with an important issue related to the human attitudes and needs in interpersonal and professional aspects. The theoretical part deals with several psychological components of the self-esteem and esteem of the others – acceptance of the others, feeling of being accepted, need for approval. Some gender differences in manifestations of acceptance and feeling of being accepted at the workplace are discussed. This article presents some empirical data for the degree of acceptance of others, feeling of being accepted and the strive for being accepted among the representatives of helping, pedagogical, administrative and economic occupations, as well as non-qualified workers. The goals of the study were to reveal the interdependency between these constructs and to be found some significant differences between the representatives of the four groups of occupations. The methods of the first study were W. Fey’s scales “Acceptance of others”, and “How do I feel accepted by others”. The method of the second study was Crown and Marlowe Scale for Social Desirability. The results indicated some significant differences in acceptance of others and feeling of being accepted between the non-qualified workers and the representatives of helping, administrative and economic occupations. There were not any significant difference in strive for being accepted between the fouroccupational groups.

  9. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  10. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  11. Quality assurance in diagnostic radiology in Hungary - first experiences in acceptance testing

    International Nuclear Information System (INIS)

    Porubszky, T.; Pellet, S.; Ballay, L.; Talian, L.; Giczi, F.

    2003-01-01

    It is a general experience that optimum imaging with minimum patient doses, moreover, the safe operation and long life of X-ray equipment can be assured by regular measurement of technical parameters and checking of their constancy (routine performance testing) only. These tests are generally known as quality control, while together with the so-called corrective actions and its management it is called (physical-technical) quality assurance (QA). In the European Union, Directive 97/43/EURATOM about radiation protection of patients requires - among others - the good practice of (physical-technical) quality assurance. In Hungary, Decree No. 31/2001. (X.3.) of the Minister of Health harmonizes all of its requirements. Acceptance testing of new diagnostic X-ray equipment is assigned to NPHC-NRIRR. QA has been a daily practice in radiation therapy and nuclear medicine for a long time. A National Patient Dose Assessment Programme has also successfully run since 1989. We had, however, only few preliminaries in QA in diagnostic radiology in the second half of the eighties. Nowadays there are running QA programmes in some hospitals and mammography centres. he testing activity of our institute is independent from manufacturers, it is run within the frame of an accredited testing laboratory, using calibrated measuring instruments and based on valid international standards. So the started way of implementing QA in diagnostic radiology needs a lot of further efforts, adapting experiences of other countries, and also some financial help to reach an acceptable level in the EU. (authors)

  12. 242A Distributed Control System Year 2000 Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  13. 242A Distributed Control System Year 2000 Acceptance Test Report

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3(trademark) (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

  14. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  15. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  16. Market driven strategy for acquisition of waste acceptance and transportation services for commercial spent fuel in the United States

    International Nuclear Information System (INIS)

    Lemeshewky, W.; Macaluso, C.; Smith, P.; Teer, B.

    1998-05-01

    The Department of Energy has the responsibility for the shipment of spent nuclear fuel (SNF) from commercial reactors to a Federal facility for storage and/or disposal. DOE has developed a strategy for a market driven approach for the acquisition of transportation services and equipment which will maximize the participation of private industry. To implement this strategy, DOE is planning to issue a Request for Proposal (RFP) for the provision of the required services and equipment to accept SNF from the utilities and transport the SNF to a Federal facility. The paper discusses this strategy and describes the RFP

  17. KSC ground operations planning for Space Station

    Science.gov (United States)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  18. Acceptance and perception of Nigerian patients to medical photography.

    Science.gov (United States)

    Adeyemo, W L; Mofikoya, B O; Akadiri, O A; James, O; Fashina, A A

    2013-12-01

    The aim of the study was to determine the acceptance and perception of Nigerian patients to medical photography. A self-administered questionnaire was distributed among Nigerian patients attending oral and maxillofacial surgery and plastic surgery clinics of 3 tertiary health institutions. Information requested included patients' opinion about consent process, capturing equipment, distribution and accessibility of medical photographs. The use of non-identifiable medical photographs was more acceptable than identifiable to respondents for all purposes (P = 0.003). Most respondents were favourably disposed to photographs being taken for inclusion in the case note, but opposed to identifiable photographs being used for other purposes most especially in medical websites and medical journals. Female respondents preferred non-identifiable medical photographs to identifiable ones (P = 0.001). Most respondents (78%) indicated that their consent be sought for each of the outline needs for medical photography. Half of the respondents indicated that identifiable photographs may have a negative effect on their persons; and the most commonly mentioned effects were social stigmatization, bad publicity and emotional/psychological effects. Most of the respondents preferred the use of hospital-owned camera to personal camera/personal camera-phone for their medical photographs. Most respondents (67.8%) indicated that they would like to be informed about the use of their photographs on every occasion, and 74% indicated that they would like to be informed of the specific journal in which their medical photographs are to be published. In conclusion, non-identifiable rather than identifiable medical photography is acceptable to most patients in the studied Nigerian environment. The use of personal camera/personal camera-phone should be discouraged as its acceptance by respondents is very low. Judicious use of medical photography is therefore advocated to avoid breach of principle of

  19. Power/response spectrum transformations in equipment qualification

    International Nuclear Information System (INIS)

    Unruh, J.F.; Kana, D.D.

    1985-01-01

    Since its introduction a few years ago the use of the power/response spectrum transformation has gained considerable interest and acceptance, and a number of new applications of the transformation have been developed in the equipment qualification area. A brief review of the power/response spectrum transformation is given with a discussion of the input/output relationships for linear systems required for elevated power spectrum generation. Frequency content of earthquakelike signals is discussed with emphasis on the resolution given by the PSD. The problem of excessive ZPA due to inconsistent spectra enveloping and mechanical nonlinearities is also discussed. The PSD/RS transformation is applied to the problems of combining various dynamic load events, developing bounding spectra, and developing damping consistent test spectra. Development of elevated component spectra corrected for base overtest and generation from in-situ measurements is reviewed

  20. Regulatory analysis for resolution of Unresolved Safety Issue A-46, seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Chang, T.Y.; Anderson, N.R.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform required safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring these plants to meet the criteria that are applied to new plants. This report presents the regulatory analysis for Unresolved Safety Issue (USI) A-46. It includes: Statement of the Problem; the Objective of USI A-46; a Summary of A-46 Tasks; a Proposed Implementation Procedure; a Value-Impact Analysis; Application of the Backfit Rule; 10 CFR 50.109; Implementation; and Operating Plants To Be Reviewed to USI A-46 Requirements

  1. Plasma Decontamination of Space Equipment for Planetary Protection

    Science.gov (United States)

    Thomas, Hubertus; Barczyk, Simon; Rettberg, Petra; Shimizu, Satoshi; Shimizu, Tetsuji; Klaempfl, Tobias; Morfill, Gregor; Zimmermann, Julia; Weber, Peter

    The search for extraterrestrial life is one of the most challenging science topics for the next decades. Space missions, like ExoMars, plan to land and search for biological remnants on planets and moons in our nearby Solar system. Planetary protection regulations defined by COSPAR prevent that during the mission biological contamination of the bodies occur through the space probes. Therefore decontamination of the probes and more general space equipment is necessary before the launch. The up-to-date accepted decontamination procedure originate from the old NASA Viking missions and use dry heat (T>110°C for 30h) - a technology not well suited for sensitive equipment nowadays. We investigated in a study financed by the German Space Agency* cold atmospheric plasma (CAP) as an alternative for such decontamination. It is well known that CAP can kill bacteria or spores within seconds or minutes, respectively, if the plasma is in direct contact with the treated sample. This procedure might also be quite aggressive to the treated surface materials. Therefore, we developed an afterglow CAP device specially designed for the soft treatment of space equipment. Afterglow plasma produced by a SMD device in air is transported into a “larger” treatment chamber where the samples are positioned. It could be shown that samples of different bacteria and spores, the latter defined by COSPAR as a means to show the effectiveness of the decontamination process, positioned on different materials (steel, Teflon, quartz) could be effectively inactivated. The surface materials were investigated after the plasma treatment to identify etching or deposition problems. The afterglow in the treatment chamber could even overcome obstacles (tubes of different height and diameter) which simulate more complicated structures of the relevant surfaces. Up to now, CAP looks like a quite promising alternative to decontaminate space equipment and need to be studied in greater detail in the near future

  2. Guidelines for Quality Control of Equipment Used in Diagnostic Radiology in the Netherlands

    International Nuclear Information System (INIS)

    Berg, L. van den; Aarts, C.N.M.; Beentjes, L.B.; Dalen, A. van; Elsakkers, P.; Julius, H.W.; Kicken, P.J.H.; Meer, F. van der; Teeuwisse, W.; Thijssen, M.A.O.; Zoetelief, J.

    1998-01-01

    The Dutch working group on 'Quality Criteria for Equipment Used in Diagnostic Radiology' has formulated guidelines providing technical criteria for equipment used in conventional diagnostic radiology. These guidelines are applicable to the technical parameters having a major impact on image quality and patient dose and include methods for testing. The following parameters are included: tube voltage, automatic exposure control, film processing, film-screen combination, light tightness and illumination of the dark room, half-value layer and filtration, light field, grid, focal spot size, viewing boxes and geometrical indicators. Each guideline consists of the following chapters: (1) Scope and field of application, (2) Background information, (3) Test procedure, (4) Test frequency, (5) Registration of observations, (6) Evaluation and interpretation, (7) Test report. Chapter 3 includes both the principles of the test method and a step by step description of the procedures. The principles of the test procedure provide a basis for adaptation to local circumstances. The step by step test procedure allows a quality control measurement to be performed with limited physical knowledge of the equipment. Chapter 6 includes limiting values. Draft guidelines were evaluated in practice in 20 hospitals. The final document has been accepted by the professional societies in the Netherlands and the Dutch Minister of Health as a reference set of tools to perform Quality Control of equipment used for conventional diagnostic radiology. (author)

  3. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  4. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  6. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. Estimation of dose challenge in radiological exams policontuses patients in public hospital in Santiago with digital radiology equipment

    International Nuclear Information System (INIS)

    Diaz-Munoz Ihmaidan, Gabriela

    2012-01-01

    lonizing radiation is always present in our natural environment and with the development of new technologies in diagnostic radiology we have elevated the exposure to radiation with an increased dose to both patient and professionals. This is of great importance for secondary stochastic effects that could be generated by exposure to ionizing radiation. There are different x-ray entrance dose studies in patients with radiological examinations in conventional radiology equipment, but not in trauma patients examinated with digital radiology equipment where there is a supposed greater exposure to radiation because of the increase of the number of radiological examinations requested. This study determined the doses received by trauma patients in a direct digital x ray equipment (in a ER in Santiago, Chile) and see if the doses are within the ones recommended by international societies. We used thermoluminescent crystals which were first properly calibrated and located in the center of the radiation beam. The results obtained show that using good practice we can obtain acceptable dose levels, independently of the digital equipment used where it is presumed that could give a higher dose of ionizing radiation exposure than conventional x-ray equipment

  8. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled

  9. Design of electronic measurement and quench detection equipment for the Current Lead Test facility Karlsruhe (CuLTKa)

    International Nuclear Information System (INIS)

    Hollik, Markus; Fietz, Walter H.; Fink, Stefan; Gehrlein, Mirko; Heller, Reinhard; Lange, Christian; Möhring, Tobias

    2013-01-01

    The Current Lead Test facility Karlsruhe (CuLTKa) is under construction at the Karlsruhe Institute of Technology (KIT) to perform acceptance tests of high temperature superconductor (HTS) current leads (CL). CuLTKa is in progress and present planning expects the completion in 2013. The data acquisition system is based on a modular design with electronic measurement and monitoring equipment covering a test voltage of 50 kV DC against ground. It provides plug-in units which enable temperature and voltage measurement at high voltage potential and in addition quench detection units which detect a loss of superconductivity reliably and quickly to avoid damage of the superconducting device under test. Prototype units for quench detection, temperature and voltage measurement have been successfully tested. Six temperature measurement units are already in use in the KIT test facility TOSKA and operated reliably during the acceptance tests of the HTS current leads for Wendelstein 7-X (W7-X) in 2011/2012. CuLTKa will be used first for 26 current leads which will be built in KIT for the fusion experiment JT-60SA. The present paper gives an overview of the design of the electronic measurement and quench detection equipment

  10. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  11. An investigation into CT radiation dose variations for head examinations on matched equipment

    International Nuclear Information System (INIS)

    Zarb, Francis; Foley, Shane; Toomey, Rachel; Rainford, Louise; Holm, Susanne; Evanoff, Michael G.

    2016-01-01

    This study investigated radiation dose and image quality differences for computed tomography (CT) head examinations across centres with matched CT equipment. Radiation dose records and imaging protocols currently employed across three European university teaching hospitals were collated, compared and coded as Centres A, B and C from specification matched CT equipment models. Patient scans (n = 40) obtained from Centres A and C were evaluated for image quality, based on the visualisation of Commission of European Community (CEC) image quality criteria using visual grading characteristic (VGC) analysis, where American Board of Radiology examiners (n = 11) stated their confidence in identifying anatomical criteria. Mean doses in terms of CT dose index (CTDI vol -mGy) and dose length product (DLP-mGy cm) were as follows: Centre A-33.12 mGy and 461.45 mGy cm; Centre B -101 mGy (base)/32 mGy (cerebrum) and 762 mGy cm and Centre C-71.98 mGy and 1047.26 mGy cm, showing a significant difference (p ≤ 0.05) in DLP across centres. VGC analysis indicated better visualisation of CEC criteria on Centre C images (VGC AUC 0.225). All three imaging protocols are routinely used clinically, and image quality is acceptable in each centre. Clinical centres with identical model CT scanners have variously customised their protocols achieving a range of dose savings and still resulting in clinically acceptable image quality. (authors)

  12. Bridging the Gap between Social Acceptance and Ethical Acceptability

    NARCIS (Netherlands)

    Taebi, B.

    2016-01-01

    New technology brings great benefits, but it can also create new and significant risks. When evaluating those risks in policymaking, there is a tendency to focus on social acceptance. By solely focusing on social acceptance, we could, however, overlook important ethical aspects of technological

  13. Video Game Acceptance: A Meta-Analysis of the Extended Technology Acceptance Model.

    Science.gov (United States)

    Wang, Xiaohui; Goh, Dion Hoe-Lian

    2017-11-01

    The current study systematically reviews and summarizes the existing literature of game acceptance, identifies the core determinants, and evaluates the strength of the relationships in the extended technology acceptance model. Moreover, this study segments video games into two categories: hedonic and utilitarian and examines player acceptance of these two types separately. Through a meta-analysis of 50 articles, we find that perceived ease of use (PEOU), perceived usefulness (PU), and perceived enjoyment (PE) significantly associate with attitude and behavioral intention. PE is the dominant predictor of hedonic game acceptance, while PEOU and PU are the main determinants of utilitarian game acceptance. Furthermore, we find that respondent type and game platform are significant moderators. Findings of this study provide critical insights into the phenomenon of game acceptance and suggest directions for future research.

  14. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  15. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  16. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  17. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  18. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  19. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  20. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  1. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  3. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  6. IEEE 693 seismic qualification of composites for substation high-voltage equipment

    Energy Technology Data Exchange (ETDEWEB)

    Schiff, A.J. [Precision Measurement Instruments, Los Altos Hills, CA (United States); Kempner, L.Jr. [Bonneville Power Administration, Vancouver, BC (Canada)

    2004-07-01

    Standard 693-1997 of the Institute of Electrical and Electronic Engineers (IEEE) is the recommended practice for seismic design of substations. It represents a significant improvement in the way the power industry seismically qualifies substation high-voltage equipment. This paper described the use of IEEE Standard 693 for hollow-core composite insulators that are used on high-voltage transformers and demonstrated that changes are warranted. The following four failure modes associated with the composite insulator were discussed: bond degradation, bond failure, tube degradation and tube layer delamination. The authors evaluated the IEEE 693 qualification procedure of time history shake-table and static-pull tests and were concerned about acceptance criteria. It was shown that acceptance criteria are not valid for qualifying hollow-core composites and that static-pull tests are needed after the vibration qualification tests are completed. It was suggested that more research is warranted to determine if bonding at the top part of the flange can be eliminated, thereby eliminating bond degradation. The resulting increase in system damping would improve the dynamic response of the unit. 1 ref., 10 figs.

  7. Impact of power uprate on environmental qualification of equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Raheja, R.D.; Mohiuddin, A.; Alsammarae, A.

    1996-01-01

    Many nuclear power facilities are finding it economically beneficial to increase reactor output, from operating plants, by resorting to power uprates. A power uprate implies that a utility can increase the reactor output, or the megawatts generated, by increasing steam pressure without adding or changing any plant systems. This is perhaps one of the least expensive options for increasing the generating capacity of a power plant. However, a nuclear plant requires a comprehensive review of the plant systems, structures and components to assure their capability to withstand the resulting increased normal and accident plant conditions. A power uprate will typically result in a plant operating at higher than the originally designed environmental conditions. Safety related equipment in nuclear plants is presently qualified to the UFSAR Chapter 15 accident events and the resulting temperatures, pressures, radiation levels etc. These values will increase when the reactor is producing a higher MWe output. Components that are sensitive to the environment must be re-evaluated and assessed to determine their acceptability and operability under the revised environmental conditions. Most safety-related mechanical and electrical equipment will require an assessment from an environmental qualification standpoint. Utilities must perform this task in a systematic, auditable and cost effective manner to optimize their resources and minimize plant costs associated with modifications, replacements or equipment testing. This paper discusses various approaches and provides recommendations to achieve equipment qualification while satisfying the plant's objective of a power uprate

  8. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  9. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  10. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  11. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  12. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  13. In acceptance we trust? Conceptualising acceptance as a viable approach to NGO security management.

    Science.gov (United States)

    Fast, Larissa A; Freeman, C Faith; O'Neill, Michael; Rowley, Elizabeth

    2013-04-01

    This paper documents current understanding of acceptance as a security management approach and explores issues and challenges non-governmental organisations (NGOs) confront when implementing an acceptance approach to security management. It argues that the failure of organisations to systematise and clearly articulate acceptance as a distinct security management approach and a lack of organisational policies and procedures concerning acceptance hinder its efficacy as a security management approach. The paper identifies key and cross-cutting components of acceptance that are critical to its effective implementation in order to advance a comprehensive and systematic concept of acceptance. The key components of acceptance illustrate how organisational and staff functions affect positively or negatively an organisation's acceptance, and include: an organisation's principles and mission, communications, negotiation, programming, relationships and networks, stakeholder and context analysis, staffing, and image. The paper contends that acceptance is linked not only to good programming, but also to overall organisational management and structures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.

  14. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  15. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  16. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  17. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  18. Consideration of demand rate in overall equipment effetiveness (OEE on equipment with constant process time

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2013-06-01

    Full Text Available Purpose: The paper is primarily done on the purpose of introducing new concept in defining the Overall Equipment Effectiveness (OEE with the consideration of both machine utilization and customer demand requested. Previous literature concerning the limitation and difficulty of OEE implementation has been investigated in order to track out the potential opportunities to be improved, since the OEE has been widely accepted by most of the industries regardless their manufacturing environment.Design/methodology/approach: The paper is conducting the study based on literature review and the computerized data collection. In details, the novel definition and method of processing the computerized data are all interpreted based on similar studies performed by others and supported by related journals in proving the validation of the output. Over the things, the computerized data are the product amount and total time elapsed on each production which is automatically recorded by the system at the manufacturing site.Findings: The finding of this paper is firstly the exposure and emphasis of limitation exists in current implementation of OEE, which showing that high utilization of the machine is encouraged regardless of the customer demand and is having conflict with the inventory handling cost. This is certainly obvious with overproduction issue especially during low customer demand period. The second limitation in general implementation of OEE is the difficulty in obtaining the ideal cycle time, especially those equipments with constant process time. The section of this paper afterward comes out with the proposed solution in fixing this problem through the definition of performance ratio and then usage of this definition in measuring the machine utilization from time to time. Before this, the time available for the production is calculated incorporating the availability of OEE, which is then used to get the Takt time.Research limitations/implications: Future

  19. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  20. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  1. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  2. Evaluation of video capture equipment for secondary image acquisition in the PACS.

    Science.gov (United States)

    Sukenobu, Yoshiharu; Sasagaki, Michihiro; Hirabuki, Norio; Naito, Hiroaki; Narumi, Yoshifumi; Inamura, Kiyonari

    2002-01-01

    There are many cases in which picture archiving and communication systems (PACS) are built with old-type existing modalities with no DICOM output. One of the methods for interfacing them to the PACS is to implement video capture (/ frame grabber) equipment. This equipment takes analog video signal output from medical imaging modalities, and amplitude of the video signal is A/D converted and supplied to the PACS. In this report, we measured and evaluated the accuracy at which this video capture equipment could capture the image. From the physical evaluation, we found the pixel values of an original image and its captured image were almost equal in gray level from 20%-90%. The change in the pixel values of a captured image was +/-3 on average. The change of gray level concentration was acceptable and had an average standard deviation of around 0.63. As for resolution, the degradation was observed at the highest physical level. In a subjective evaluation, the evaluation value of the CT image had a grade of 2.81 on the average (the same quality for a reference image was set to a grade of 3.0). Abnormalities in heads, chests, and abdomens were judged not to influence diagnostic accuracy. Some small differences were seen when comparing captured and reference images, but they are recognized as having no influence on the diagnoses.

  3. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  4. MEASUREMENT FOR ACCEPTANCE OF SUPPLY CHAIN SIMULATOR APPLICATION USING TECHNOLOGY ACCEPTANCE MODEL

    Directory of Open Access Journals (Sweden)

    Mulyati E.

    2018-03-01

    Full Text Available The aim of this research for was to measure the user acceptance of simulator application which was built as a tool for student in learning of supply chain, particularly in bullwhip effect problem. The measurements used for the acceptance of supply chain simulator application in this research was the Technology Acceptance Model from 162 samples which were analyzed with Confirmatory Factor Analysis and Structural Equation Modelling. The result of this research indicated that the user acceptance (shown by customer participation of supply chain simulator was directly influence by perceived usefulness of supply chain simulator application used (positive and significant; the user acceptance of supply chain simulator was indirectly influenced by perceived ease of use in using supply chain simulator application (positive but not significant; the user acceptance of supply chain simulator was indirectly influenced by perceived enjoyment when the supply chain simulator application was used. The research would give a better understanding about a bullwhip effect and better experience for students, which would not be obtained through conventional learning, when the tools were not used.

  5. Development of food acceptance patterns in the first years of life.

    Science.gov (United States)

    Birch, L L

    1998-11-01

    As young omnivores, children make the transition from the exclusive milk diet of infancy to consuming a variety of foods. They must learn to accept a set of the foods available in their environmental niche, and they 'come equipped' with a set of predispositions that facilitate the development of food acceptance patterns, constrained by predisposition and limited by what is offered to them. While children are predisposed to like sweet or salty foods and to avoid sour or bitter foods, their preferences for the majority of foods are shaped by repeated experience. The predispositions that shape food acceptance patterns also include neophobia and the predisposition to learn to prefer and accept new foods when they are offered repeatedly. In addition, the predisposition for associative conditioning affects children's developing food acceptance patterns, resulting in preferences for foods offered in positive contexts, while foods presented in negative contexts will become more disliked via the learning of associations with the social and environmental contexts. Children also learn to prefer energy-dense foods when consumption of those foods is followed by positive post-ingestive consequences, such as those produced when high-energy-density foods are eaten when hungry. Although children are predisposed to be responsive to the energy content of foods in controlling their intake, they are also responsive to parents' control attempts. We have seen that these parental control attempts can refocus the child away from responsiveness to internal cues of hunger and satiety and towards external factors such as the presence of palatable foods. This analysis suggests that taking a closer look at what children are learning about food and eating may provide clues regarding the formation of children's food acceptance patterns, and that this approach also suggests potential causative factors implicated in the aetiology of obesity and the emergence of weight concerns. Current data

  6. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  7. SU-F-J-20: Commissioning and Acceptance Testing of the C-Rad CatalystHD Surface Imaging System

    International Nuclear Information System (INIS)

    Stanley, D; Rasmussen, K; Kirby, N; Papanikolaou, N; Gutierrez, A

    2016-01-01

    Introduction: With the increasing use of surface-based, nonionizing image-guided radiotherapy (IGRT) systems, a comprehensive set of clinical acceptance and commissioning procedures are needed to ensure correct functionality and proper clinical integration. Although TG-147 provides a specific set of parameters, measurement methodologies have yet to be described. The aim of this study was to provide a comprehensive overview of the commissioning and acceptance analysis performed for the C-Rad CatalystHD imaging system. Methods and Materials: Methodology for the commissioning and acceptance of the C-Rad CatalystHD imaging system was developed using commercially available clinical equipment. Following TG-147 guidelines, the following tests were performed: integration of peripheral equipment, system drift, static spatial reproducibility and localization accuracy, static end-to-end analysis, static rotational accuracy, dynamic spatial accuracy, dynamic temporal accuracy, dynamic radiation delivery and a comprehensive end-to-end analysis. Results: The field of view (FOV) of the CatalystHD was 105×109×83 cm3 in the lateral, longitudinal and vertical directions. For thermal equilibrium and system drift, a thermal drift of 1.0mm was noted. A 45 min warmup time is recommended if the system has been shut off an extended period of time (>24 hours) before the QA procedure to eliminate any thermal drift. Spatial reproducibility was found to be 0.05±0.03 mm using a rigid phantom. For the static localization accuracy, system agreement with couch shifts was within 0.1±0.1 mm and positioning agreement with kV-CBCT was 0.16±0.10 mm. For static rotational accuracy, system agreement with a high precision rotational stage (0.01 deg precision) was within 0.10±0.07 deg. Dynamic spatial and temporal localization accuracy was found to be within 0.2±0.1 mm. Conclusion: A comprehensive commissioning and acceptance study was performed using commercially available phantoms and in

  8. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  9. The Small Acceptance Vertex Detector of NA61/SHINE

    Directory of Open Access Journals (Sweden)

    Deveaux M.

    2018-01-01

    Full Text Available Charmonium production in heavy ion collisions is considered as an important diagnostic probe for studying the phase diagram of strongly interacting matter for potential phase transitions. The interpretation of existing data from the CERN SPS is hampered by a lack of knowledge on the properties of open charm particle production in the fireball. Moreover, open charm production in heavy ion collisions by itself is poorly understood. To overcome this obstacle, the NA61/SHINE was equipped with a Small Acceptance Vertex Detector (SAVD, which is predicted to make the experiment sensitive to open charm mesons produced in A-A collisions at the SPS top energy. This paper will introduce the concept and the hardware of the SAVD. Moreover, first running experience as obtained in a commissioning run with a 150 AGeV/c Pb+Pb collision system will be reported.

  10. Seismic qualification of equipment in operating nuclear power plants: Unresolved Safety Issue A-46

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46. In addition, the collection and review of seismic experience data and existing seismic test data are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experienced data base. The principal technical finding of USI A-46 is that seismic experience data, supplemented by existing seismic test data, applied in accordance with the guidelines developed, can be used to verify the seismic adequacy of mechanical and electrical equipment in operating nuclear plants. Explicit seismic qualification should be required only if seismic experience data or existing test data on similar components cannot be shown to apply

  11. The perceived feasibility and acceptability of a conceptually challenging exercise training program in older adults.

    Science.gov (United States)

    Miller, Clint T; Teychenne, Megan; Maple, Jaimie-Lee

    2018-01-01

    Exercise training is an essential component of falls prevention strategies, but they do not fully address components of physical function that leads to falls. The training approaches to achieve this may not be perceived as appropriate or even feasible in older adults. This study aims to assess the perceived feasibility and acceptability of novel exercise training approaches not usually prescribed to older adults. Fourteen adults were exposed to conceptually and physically demanding exercises. Interviews were then conducted to determine perceptions and acceptability of individual exercise tasks. Qualitative thematic analysis was used to identify themes. Safety and confidence, acceptability, and population participation were the key themes identified. Staff knowledge, presence, program design, and overt safety equipment were important for alleviating initial apprehension. Although physically demanding, participants expressed satisfaction when challenged. Prior disposition, understanding the value, and the appeal of novel exercises were perceived to influence program engagement. Given the evidence for acceptability, this type of training is feasible and may be appropriate as part of an exercise training program for older adults. Further research should be conducted to confirm that the physical adaptations to exercise training approaches as presented in this study occur in a similar manner to that observed in younger adults, and to also determine whether these adaptations lead to prolonged independence and reduced falls in older adults compared to usual care.

  12. Restart Plan for the Prototype Vertical Denitration Calciner [SD Coversheet has Incorrect Document Number

    Energy Technology Data Exchange (ETDEWEB)

    SUTTER, C.S.

    1999-07-26

    Testing activities on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The Restart Plan will govern the transition of the test program from the completion of the activity based startup review; through equipment checkout and surrogate material runs; to resumption of the testing program and transition to unrestricted testing.

  13. Restart plan for the prototype vertical denitration calciner

    Energy Technology Data Exchange (ETDEWEB)

    SUTTER, C.S.

    1999-09-01

    Testing activities on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The Restart Plan will govern the transition of the test program from the completion of the activity based startup review; through equipment checkout and surrogate material runs; to resumption of the testing program and transition to unrestricted testing.

  14. Restart plan for the prototype vertical denitration calciner

    International Nuclear Information System (INIS)

    SUTTER, C.S.

    1999-01-01

    Testing activities on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The Restart Plan will govern the transition of the test program from the completion of the activity based startup review; through equipment checkout and surrogate material runs; to resumption of the testing program and transition to unrestricted testing

  15. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  16. Shields calculations for teletherapy equipment. Regulatory approach of the National Center of Nuclear Safety

    International Nuclear Information System (INIS)

    Fuente P, A. de la; Dumenigo G, C.; Quevedo G, J.R.; Lopez F, Y.

    2006-01-01

    The evaluation of applications of construction licenses for the new services of radiotherapy has occupied a significant space in the activity developed by the National Center of Nuclear Safety (CNSN) in the last 2 years. Presently work the experiences of the authors in the evaluation of the required shield for the local where cobalt therapy equipment and lineal accelerators of medical use are used its are exposed, the practical problems detected are approached during the application of the methodologies recommended in both cases and its are discussed which have been the suppositions of items accepted by the Regulatory Authority for the realization of these shield calculations. The accumulated experience allows to assure that the realistic application of the item data and the rational use of the engineering logic makes possible to design local for radiotherapy equipment that fulfill the established dose restrictions in the in use legislation in Cuba, without it implies an excessive expense of construction materials. (Author)

  17. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  18. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  19. Chinese Nurses' Acceptance of PDA: A Cross-Sectional Survey Using a Technology Acceptance Model.

    Science.gov (United States)

    Wang, Yanling; Xiao, Qian; Sun, Liu; Wu, Ying

    2016-01-01

    This study explores Chinese nurses' acceptance of PDA, using a questionnaire based on the framework of Technology Acceptance Model (TAM). 357 nurses were involved in the study. The results reveal the scores of the nurses' acceptance of PDA were means 3.18~3.36 in four dimensions. The younger of nurses, the higher nurses' title, the longer previous usage time, the more experienced using PDA, and the more acceptance of PDA. Therefore, the hospital administrators may change strategies to enhance nurses' acceptance of PDA, and promote the wide application of PDA.

  20. [A young child with respiratory acidosis and hypoxia from mechanical ventilation with equipment made for adults].

    Science.gov (United States)

    Joor, Fleur; Markhorst, Dick G; Kneyber, Martin C J; van Heerde, Marc

    2011-01-01

    During mechanical ventilation of young children, problems may arise due to the additional dead space of the ventilation circuit. This may lead to respiratory acidosis and even hypoxia in the child. A 3-month-old boy suffered from frequent apnoea. He was mechanically ventilated for this. Shortly after its initiation, he developed severe respiratory acidosis, hypoxemia and circulatory insufficiency. This was due to a large additional dead space caused by the use of equipment components made for adults. After he was switched to a circuit suitable for himself, he recovered rapidly. As a rule of thumb, an additional dead space of 1.5-2 ml/kg body weight is acceptable in young children. Emergency wards for young children should have specific equipment to mechanically ventilate them, and have a protocol paying explicit attention to the dead space.

  1. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  2. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  3. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  4. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  5. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  6. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  7. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  8. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  9. Age and Acceptance of Euthanasia.

    Science.gov (United States)

    Ward, Russell A.

    1980-01-01

    Study explores relationship between age (and sex and race) and acceptance of euthanasia. Women and non-Whites were less accepting because of religiosity. Among older people less acceptance was attributable to their lesser education and greater religiosity. Results suggest that quality of life in old age affects acceptability of euthanasia. (Author)

  10. Survey of past base isolation applications in nuclear power plants and challenges to industry/regulatory acceptance

    International Nuclear Information System (INIS)

    Malushte, S.R.; Whittaker, A.S.

    2005-01-01

    Seismic base isolation provides many benefits that can facilitate the standardization of future nuclear power plant structures and equipment while reducing the initial/life-cycle cost and construction schedule. This paper presents a survey of past seismic base isolation applications and studies related to nuclear applications and provides a discussion of the challenges that need to be overcome to gain industry and regulatory acceptance for deployment in future US nuclear power plants. Issues related to design, codes/standards/regulations, procurement, and construction, have been identified. (authors)

  11. Gamma-ray spectrometry combined with acceptable knowledge (GSAK). A technique for characterization of certain remote-handled transuranic (RH-TRU) wastes. Part 2. Testing and results

    International Nuclear Information System (INIS)

    Hartwell, J.K.; McIlwain, M.E.

    2005-01-01

    Gamma-ray spectrometry combined with acceptable knowledge (GSAK) is a technique for the characterization of certain remote-handled transuranic (RH-TRU) wastes. GSAK uses gamma-ray spectrometry to quantify a portion of the fission product inventory of RH-TRU wastes. These fission product results are then coupled with calculated inventories derived from acceptable process knowledge to characterize the radionuclide content of the assayed wastes. GSAK has been evaluated and tested through several test exercises. These tests and their results are described; while the former paper in this issue presents the methodology, equipment and techniques. (author)

  12. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  13. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  14. Lesson learned - CGID based on the Method 1 and Method 2 for digital equipment

    International Nuclear Information System (INIS)

    Hwang, Wonil; Sohn, Kwang Young; Cho, Chang Hwan; Kim, Sung Jong

    2015-01-01

    The acceptance methods associated with commercial-grade dedication are the following: 1) Special tests and inspection (Method 1) 2) Commercial-grade surveys (Method 2) 3) Source verification (Method 3) 4) An acceptable item and supplier performance record (Method 4) Special tests and inspections, often referred to as Method 1, are performed by the dedicating entity after the item is received to verify selected critical characteristics. Conducting a commercial-grade survey of a supplier is often referred to as Method 2. Supplier audits to verify compliance with a nuclear QA program do not meet the intent of a commercial-grade survey. Source verification, often referred to as Method 3, entails verification of critical characteristics during manufacture and testing of the item being procured. The performance history (good or bad) of the item and supplier is a consideration when determining the use of the other acceptance methods and the rigor with which they are used on a case-by-case basis. Some digital equipment system has the delivery reference and its operating history for Nuclear Power Plant as far as surveyed. However it was found that there is difficulty in collecting this of supporting data sheet, so that supplier usually decide to conduct the CGID based on the Method-1 and Method-2 based on the initial qualification likely. It is conceived that the Method-4 might be a better approach for CGID(Commercial Grade Item Dedication) even if there are some difficulties in data package for justifying CGID from the vendor and operating organization. This paper present the lesson learned from the consulting for Method-1 and 2 for digital equipment dedication. Considering all the information above, there are a couple of issues to remind in order to perform the CGID for Method-2. In doing commercial grade survey based on Method 2, quality personnel as well as technical engineer shall be involved for integral dedication. Other than this, the review of critical

  15. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  16. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  17. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  18. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  19. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  20. DEVELOPMENT OF PROTOTYPE SYSTEM FOR REGULATING THERMAL CONDITIONS OF TELECOMMUNICATIONS EQUIPMENT CABINETS

    Directory of Open Access Journals (Sweden)

    A. T. Rashidkhanov

    2017-01-01

    Full Text Available Objectives. The main objective of the study was to regulate the thermal regime and ensure the reliability of electronic equipmentMethods. In order to conduct experimental studies of the thermoelectric cooling system using heat pipes, a stand was assembled on which the developed and manufactured prototype was studied. The object of the experimental studies was a prototype cooling system, consisting of a thermoelectric battery made of conventional unified thermoelectric materials of ICE-71 type. The solution of the research problems carried out by the method of reduction to ordinary differential equations (Kantorovich method provides acceptable accuracy for such a class of problems.Results. A design of a telecommunication equipment cabinet with a thermal management system based on the use of heat pipes and thermoelectric cooling units is proposed. A mathematical model for the determination of the thermal field in the cabinet volume is considered; an experimental stand for the prototype study is described; the results of experimental studies for various power sources of heat release are presented.Conclusion. Experimental studies confirm the operability of the developed cooling system for cabinets with telecommunication equipment; this cooling method has advantages over conventional forced or natural cooling; the temperature in the block volume and the peak values of the heat sources are significantly reduced; at dissipation powers on one board within 50 W there is no need to use special means to remove heat from hot junctions of the thermoelectric battery.

  1. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  2. Risk-based equipment removal guide for on-line maintenance at PSE ampersand G

    International Nuclear Information System (INIS)

    Knoll, A.; Smith, C.; Pollock, J.

    1995-01-01

    On-line maintenance plays an important role in achieving safe and reliable power generation in a nuclear power plant. However, maintenance, if not properly planned and performed, may also be an important contributor to plant risk. Therefore, plant-specific procedures are needed for equipment removal from service to enhance the benefits of on-line maintenance and minimize the risks involved. The problem is to identify and implement the most effective on-line maintenance policy in the form of a proceduralized guide to assure plant safety under various operation and maintenance constraints. This paper presents a methodology to develop plant-specific on-line maintenance strategies and acceptance criteria using a multivariate safety approach based on risk assessment. Based on plant-specific data as modeled in the individual plant evaluation (IPE) and the updated probabilistic safety assessment (PSA), the risk-based methodology is currently being applied to the development of proceduralized equipment removal guides at Hope Creek and Salem units 1 and 2 of Public Service Electric and Gas Company (PSE ampersand G)

  3. Fitness-for-service and decisions for petroleum and chemical equipment. PVP-Volume 315

    International Nuclear Information System (INIS)

    Prager, M.; Becht, C. IV; Depadova, T.A.; Okazaki, M.; Onyewuenyi, O.A.; Smith, J.P.; Takezono, S.; Weingart, L.J.; Yagi, K.

    1995-01-01

    This volume is part of a series of publications intended to present the technical foundation for broadly accepted practices to establish the mechanical integrity of equipment in service. A focal point for this activity has been a Materials Properties Council program on fitness-for-service (FSS) reported in earlier PVP volumes. Work reported here covers the full range of equipment of interest to petroleum and chemical companies from LNG to creep service and provides a snapshot of current Codes, methods, concerns, and problems. It encompasses crack-like flaws and local thinning situations, welds, clad vessels, storage tanks, and pressure vessels. The work in progress is only a start, and the papers herein should be viewed as part of the process of validating the techniques used. While most of the applications are to petroleum refineries and natural gas processing plants, some papers deal with fossil-fuel power plants, nuclear power plants, synthetic fuels refineries, and materials for high-temperature applications. Papers have been processed separately for inclusion on the data base

  4. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  5. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  6. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  7. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  8. Validity and reliability of a home environment inventory for physical activity and media equipment

    Directory of Open Access Journals (Sweden)

    Pereira Mark A

    2008-04-01

    Full Text Available Abstract Background Little is known about how the home environmental supports physical activity and screen media usage. The purpose of this study was to develop and test the reliability and validity of a self-report instrument to comprehensively reflect the availability and accessibility of physical activity and screen media equipment in the home environment. Methods Ten families participated in the initial field testing to provide feedback for instrument development. Thirty one adult participants, each of whom had at least one child 10–17 years old, completed two Physical Activity and Media Inventory (PAMI instruments. The first PAMI was completed simultaneously, but independently, with a research assistant to assess validity. A second PAMI was completed by the participant one week later to assess reliability. Results The adult participants were mostly mothers/female guardians, mean age 38 ± 7.2 years, mostly Caucasian (52%, college educated (65%, living in single family homes (74%. Test-retest reliability was acceptable to strong for all summary variables (physical activity equipment, ICC = 0.76 to 0.99; media equipment, ICC = 0.72 to 0.96. For validation, reports from participants and research assistants were strongly correlated (physical activity, 0.67 – 0.98; media, 0.79 – 0.96. Compared to participants, research assistants reported a greater percentage of physical activity equipment as "in plain view and easy to get to" and a smaller percentage of items as "put away and difficult to get to". Conclusion Our results indicate strong evidence for the reliability and validity of the variables calculated from the PAMI. This self report inventory may be useful in assessing the availability of physical activity and screen media equipment in the home environment and could be used in conjunction with other home assessment tools (food availability, parenting styles and feeding practices to identify obesogenic home environments.

  9. FUZZY ACCEPTANCE SAMPLING AND CHARACTERISTIC CURVES

    Directory of Open Access Journals (Sweden)

    Ebru Turano?lu

    2012-02-01

    Full Text Available Acceptance sampling is primarily used for the inspection of incoming or outgoing lots. Acceptance sampling refers to the application of specific sampling plans to a designated lot or sequence of lots. The parameters of acceptance sampling plans are sample sizes and acceptance numbers. In some cases, it may not be possible to define acceptance sampling parameters as crisp values. These parameters can be expressed by linguistic variables. The fuzzy set theory can be successfully used to cope with the vagueness in these linguistic expressions for acceptance sampling. In this paper, the main distributions of acceptance sampling plans are handled with fuzzy parameters and their acceptance probability functions are derived. Then the characteristic curves of acceptance sampling are examined under fuzziness. Illustrative examples are given.

  10. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  11. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  12. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  13. Evolution of and projections for automated composite material placement equipment in the aerospace industry

    Science.gov (United States)

    McCarville, Douglas A.

    2009-12-01

    As the commercial aircraft industry attempts to improve airplane fuel efficiency by shifting from aluminum to composites (reinforced plastics), there is a concern that composite processing equipment is not mature enough to meet increasing demand and that delivery delays and loss of high tech jobs could result. The research questions focused on the evolution of composite placement machines, improvement of machine functionality by equipment vendors, and the probability of new inventions helping to avoid production shortfalls. An extensive review of the literature found no studies that addressed these issues. Since the early twentieth century, exploratory case study of pivotal technological advances has been an accepted means of performing historic analysis and furthering understanding of rapidly changing marketplaces and industries. This qualitative case study investigated evolution of automated placement equipment by (a) codifying and mapping patent data (e.g., claims and functionality descriptions), (b) triangulating archival data (i.e., trade literature, vender Web sites, and scholarly texts), and (c) interviewing expert witnesses. An industry-level sensitivity model developed by the author showed that expanding the vendor base and increasing the number of performance enhancing inventions will most likely allow the industry to make the transition from aluminum to composites without schedule delays. This study will promote social change by (a) advancing individual and community knowledge (e.g., teaching modules for students, practitioners, and professional society members) and (b) providing an empirical model that will help in the understanding and projection of next generation composite processing equipment demand and productivity output.

  14. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  15. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  16. Challenges and Prospects of Equipment Health Monitoring with Wireless Sensor Network in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Chen, Dongyi; Jiang, Jin; Bari, Ataul; Wang, Quan; Hashemian, Hash-M.

    2014-01-01

    A wireless sensor network (WSN) system can offer tremendous benefits to equipment condition monitoring in newly-constructed and/or refurbished nuclear power plants (NPPs). However, it has not been widely accepted so far because of the following requirements by the NPP operators ectromagnetic (EM) emissions from the wireless transceivers must not interfere with the functionalities of the sensitive safety and protection systems in the plant, WSN must perform reliably in the presence of high levels of EM interference from devices such as relays and motor driven pumps, and ionizing radiation sources, dependable WSN performance in harsh industrial environments that are cluttered with cable trays, piping, valves, pumps, motors, and concrete and steel structures, and trict compliance with nuclear regulatory guidelines on EM emissions by the wireless devices. This paper will review the key issues associated with the deployment of WSN for equipment condition monitoring in NPPs. Some promising WSN technologies that can be used in NPP applications are also discussed

  17. Challenges and Prospects of Equipment Health Monitoring with Wireless Sensor Network in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Dongyi [University of Electronic Science and Technology of China, Chengdu (China); Jiang, Jin; Bari, Ataul; Wang, Quan [University of Western Ontario, Ontario (Canada); Hashemian, Hash-M. [AMS Technology Center Knoxville (United States)

    2014-08-15

    A wireless sensor network (WSN) system can offer tremendous benefits to equipment condition monitoring in newly-constructed and/or refurbished nuclear power plants (NPPs). However, it has not been widely accepted so far because of the following requirements by the NPP operators ectromagnetic (EM) emissions from the wireless transceivers must not interfere with the functionalities of the sensitive safety and protection systems in the plant, WSN must perform reliably in the presence of high levels of EM interference from devices such as relays and motor driven pumps, and ionizing radiation sources, dependable WSN performance in harsh industrial environments that are cluttered with cable trays, piping, valves, pumps, motors, and concrete and steel structures, and trict compliance with nuclear regulatory guidelines on EM emissions by the wireless devices. This paper will review the key issues associated with the deployment of WSN for equipment condition monitoring in NPPs. Some promising WSN technologies that can be used in NPP applications are also discussed.

  18. Market driven strategy for acquisition of waste acceptance and transportation services for commercial spent fuel in the united states

    International Nuclear Information System (INIS)

    Lemeshewsky, W.; Macaluso, C.; Smith, P.; Teer, B.

    1998-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) in the United States Department of Energy (DOE) has the responsibility under the Nuclear Waste Policy Act of 1982 (the Act) for the shipment of spent nuclear fuel (SNF) from commercial reactors to a Federal facility for storage and/or disposal. The Act requires the use of private industry to the 'fullest extent possible' in the transportation of spent fuels. An OCRWM goal is to develop a safe, efficient and effective transportation system while meeting the mandate of the Act. OCRWM has then develop a strategy for a market driven approach for the acquisition of transportation services and equipment. To implement this strategy, OCRWM is planning to issue a Request for Proposal (RPF) for the provision of the required services and equipment to accept SNF from the utilities and transport the SNF to a Federal facility. Two draft RPFs have been issued with the second draft incorporating comments on the first draft from potential contractors and other interested parties. The overall strategy as outlined in the draft RPF relies on private industry to use the innovative powers of the marketplace to help DOE accomplish its mission objectives. DOE intends to pursue this procurement strategy whether or not the OCRWM program includes interim storage. The concept described in the draft RPF provides for DOE to purchase services and equipment from a contractor-operated waste acceptance and transportation organization. The contractor is expected to provide initial financing for the project including that necessary for initial acquisition of operational equipment, establish the necessary management organization, and mobilize the necessary resources and capabilities to provide the SNF delivery services at a fixed rate. DOE will retain final approval on all routes and maintain primary responsibility to the States, tribes, and local units of government for assuring appropriate interaction and consideration of their input on

  19. Cold Pump Test and Training and Mock-Up Facility Functions and Requirements

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document defines the functions and requirements (F and R) for a test facility to provide for pre-deployment, checkout, testing, and training for the underground storage tank retrieval equipment, systems, and crews that will be developed or deployed as part of Waste Feed Delivery. The F and R for a River Protection Project retrieval test facility, one that supports a production mode tank farm system, are identified

  20. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  1. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  2. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  3. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  4. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  5. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  6. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  7. Public acceptance of nuclear power

    International Nuclear Information System (INIS)

    Wildgruber, O.H.

    1990-01-01

    The lecture addresses the question why we need public acceptance work and provides some clues to it. It explains various human behaviour patterns which determine the basics for public acceptance. To some extent, the opposition to nuclear energy and the role the media play are described. Public acceptance efforts of industry are critically reviewed. Some hints on difficulties with polling are provided. The lecture concludes with recommendations for further public acceptance work. (author)

  8. Evaluation of retrieval activities and equipment for removal of containers from the transuranic storage area retrieval enclosure

    International Nuclear Information System (INIS)

    Bannister, R.; Rhoden, G.; Davies, G.B.

    1995-09-01

    Since 1970, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory has accepted over 55,000 cubic meters of Transuranic contaminated hazardous waste for interim storage. The waste has been neatly stored in ''cell'' configurations on adjoining, above ground asphalt pads at the Transuranic Storage Area (TSA). A number of reports have been supplied for review and comment describing the methodology and equipment proposed for retrieval of drums and boxes from a storage facility at the INEL site. The contract for this review requires two main issues to be addressed. First, the adequacy of equipment and methodology for the retrieval of containers which have been breached, lost structural integrity, or are otherwise damaged, Second, to review the strategies and equipment for retrieval of intact waste containers. These issues are presented in the following report along with additional detail in the methodology to complete the description of the operations required for retrieval under most operational scenarios. The documentation reviewed is considered to be at an interim stage and is therefore expected to be subject to the development of the methodology from the existing level of detail with input from the facility operators. This review aims to anticipate some of this development by providing suggested detailed methods of retrieval and equipment for both normal and abnormal operations

  9. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  10. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  11. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  12. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  13. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  14. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  15. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  16. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  17. The usage of filtration as fulfillment of acceptable indoor and optimal energy management

    International Nuclear Information System (INIS)

    Burroughs, H.E.

    1993-01-01

    The role of filtration is a significant factor in the prevention and mitigation of indoor air quality problems. ASHRAE Standard 62-89. Ventilation for Acceptable Indoor Air Quality, makes broad and non-specific references to filtration. This paper provides guidelines for the usage of filtration as a means of fulfillment of the Standard's requirements. The paper also references the specific authorities as iterated in the Standard. The discussion will include the usage of filtration in treating contaminated outside air, protection of equipment and systems, protection of occupants, reduction of ventilation air, and source control. The reduction of ventilation air through filtration has significant and positive energy management benefits. Other energy benefits accrue from clean heat exchange surfaces

  18. Blind and Deaf to Acceptance: The Role of Self-Esteem in Capitalizing on Social Acceptance

    OpenAIRE

    Luerssen, Anna Maud

    2013-01-01

    Across two studies, we evaluated whether people with low self-esteem are less likely to capitalize on, or take full advantage of, their romantic partners' accepting behaviors. We conceptualized capitalization as the tendency to perceive acceptance when it occurs, and to experience positive changes in affect and relationship satisfaction when acceptance is perceived. We found that participants with low self-esteem under-perceived their partners' acceptance, both in daily life and in the labora...

  19. Challenge accepted : Genessee Mine working to maintain clean record

    Energy Technology Data Exchange (ETDEWEB)

    Ednie, H.

    2010-09-15

    The Genesee Mine produces 5.5 million tonnes of coal annually for the Genesee Power Plant run by Capital Power. The mine operators place much emphasis on safety and have achieved 22 consecutive years without a lost time accident, which is as long as the mine has been in operation. After recently accepting its tenth safety award, the company recognizes that it must avoid complacency. Employees were asked their opinions regarding the company's safety record. The employee response was that positive attitudes contribute to the safe work environment, together with competent trainers, employee interest in the condition of equipment, good communication, and good leadership. The on-site workforce now encompasses over 160 employees. The ISO 9000 and 14001 and other standards and policies have not only driven the safety program, but the safety performance to date has set the bar high. A hazard assessment program requires that crew be responsive to safety indicators every day. 1 fig.

  20. PCDP [Prototypical Spent Fuel Consolidation Equipment Demonstration Project] design basis accident report 9315-P-103, Rev. A

    International Nuclear Information System (INIS)

    1987-12-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) has identified a requirement to integrate the spent fuel rod consolidation design activities of each of several proposed geological repository facilities and the Monitored Retrievable Storage (MRS) facility, and to develop efficient and cost-effective equipment for the consolidation process. The equipment to be developed for the rod consolidation system will be required to operate in a dry environment at rates which can be appropriately scaled to approximate the waste management system acceptance rates, irrespective of repository geologic characteristics or the existence of an MRS facility in the waste management system. The purpose of this report is to identify and analyze the range of facility credible events and accident occurrences (from minor to the design basis accidents) and their causes and consequences. For each situation, the considerations to prevent or mitigate the event or accident is addressed

  1. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  2. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  3. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  4. BWR nuclear plant maintenance simulation

    International Nuclear Information System (INIS)

    Stuart, I.F.

    1985-01-01

    As early as 1977, the General Electric Company, USA, Nuclear Energy Operation was making plans to construct a maintenance-type simulator to support Training and Services. The Company's pioneering experience with control room simulators started in 1968 with the Dresden simulator and showed clearly the benefits of having such facilities for training, checkout of procedures and, in the case of maintenance, match-up of equipment or tools as needed. Since the dedication of the facility, it has proved to be an invaluable resource in the training of refuelling and servicing crews. The facility has also been extensively used as developmental and test facility for in-vessel servicing equipment and procedures. (author)

  5. Electricity supply between acceptance, acceptability and social compatibility; Energieversorgung zwischen Akzeptanz, Akzeptabilitaet und Sozialvertraeglichkeit

    Energy Technology Data Exchange (ETDEWEB)

    Schubert, Katharina; Koch, Marco K. [Bochum Univ. (Germany). Lehrstuhl Energiesysteme und Energiewirtschaft (LEE)

    2012-11-01

    Acceptance promotion is supposed to be an indispensable premise for a successful realization of an energy concept. The contribution identifies deficiencies of the energy policy, including intransparency, complexity of decision procedures, for instance in case of the so called energy transmission line extension acceleration law, that has caused irritation and anger in the public. The justification of acceptance promotion is questioned in connection with the German nuclear policy reversal following the Fukushima accident. A research program ''public acceptance of large-scale power plants for electricity generation'' is presented. The issues criteria and limits of acceptability are of main importance for this discussion.

  6. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  7. Zone of Acceptance Under Performance Measurement: Does Performance Information Affect Employee Acceptance of Management Authority?

    DEFF Research Database (Denmark)

    Nielsen, Poul Aaes; Jacobsen, Christian Bøtcher

    2018-01-01

    Public sector employees have traditionally enjoyed substantial influence and bargaining power in organizational decision making, but few studies have investigated the formation of employee acceptance of management authority. Drawing on the ‘romance of leadership’ perspective, we argue that perfor......Public sector employees have traditionally enjoyed substantial influence and bargaining power in organizational decision making, but few studies have investigated the formation of employee acceptance of management authority. Drawing on the ‘romance of leadership’ perspective, we argue...... that performance information shapes employee attributions of leader quality and perceptions of a need for change in ways that affect their acceptance of management authority, conceptualized using Simon’s notion of a ‘zone of acceptance.’ We conducted a survey experiment among 1,740 teachers, randomly assigning...... true performance information about each respondent’s own school. When employees were exposed to signals showing low or high performance, their acceptance of management authority increased, whereas average performance signals reduced employee acceptance of management authority. The findings suggest...

  8. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  9. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  10. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  11. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  12. Application of ultrasonic inspection data in strength calculations for nuclear power plant equipment

    International Nuclear Information System (INIS)

    Ovchinnikov, A.V.; Rivkin, E.Yu.; Vasilchenko, G.S.; Zvezdin, Yu.I.

    1991-01-01

    Several kinds of test specimens were produced with three types of defects of defined sizes and positions in the particular localities of weld joints. Such specimens have been used for defect parameter characterization by ultrasonic testing. The principles for schematization of such defects and the formulae for the stress intensity factor calculations for elliptical and semielliptical cracks have been worked out. Methods for defining the sizes of defect which are acceptable have been designed for use for use on operational nuclear power plant equipment and take account of the mutual effects of the force, thermal and residual stresses. The method can be used in the brittle, transitional and tough material state. (author)

  13. Evaluation of the quality parameters of mobile X-ray units equipment used for radiodiagnostic in public institutions of Sergipe

    International Nuclear Information System (INIS)

    Oliveira, Celso A.; Santos, Lucas R. dos; Silva, Fabio A.R.; Souza, Divanizia N.

    2008-01-01

    This project was started having as main objective to observe the diagnosis quality offered by mobile x-ray units utilized in a health care institution. In this work we are reporting the first results obtained from three equipment used by a public institution inspected on the state of Sergipe, Brazil. During the verification visits at institution the radiology technicians were questioned about specific maintenances performed on the equipment and the operating procedures used. Moreover, some beams parameters were verified as dose, dose rate, and peak voltage and exposition time. The obtained results showed a good index of reproducibility and linearity of the operation parameters, of the kerma air rate and exposition time. However, to the kVp tests were observed variations up to 20% between the nominal value used and the value measured on the X-ray units. The test results of the focal point are in accordance with the acceptable standards. The analyses of equipment and the answered questionnaire showed that have not been performed periodic maintenances in the equipment, therefore some of the equipment do not present satisfactory requirements of operating, their do not make use of luminous field nether collimator or the scale meter to checking the source to surface distance. The main factor that can explains the negative results is the absence of a continue quality program associated with the unsatisfactory maintenances. The health care institutions evaluated are introducing a permanent quality program to the X-ray devices. (author)

  14. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  15. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  16. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  17. Acceptable noise level

    DEFF Research Database (Denmark)

    Olsen, Steen Østergaard; Nielsen, Lars Holme; Lantz, Johannes

    2012-01-01

    The acceptable noise level (ANL) is used to quantify the amount of background noise that subjects can accept while listening to speech, and is suggested for prediction of individual hearing-aid use. The aim of this study was to assess the repeatability of the ANL measured in normal-hearing subjects...... using running Danish and non-semantic speech materials as stimuli and modulated speech-spectrum and multi-talker babble noises as competing stimuli....

  18. Acceptable noise level

    DEFF Research Database (Denmark)

    Olsen, Steen Østergaard; Nielsen, Lars Holme; Lantz, Johannes

    2012-01-01

    The acceptable noise level (ANL) is used to quantify the amount of background noise that subjects can accept while listening to speech, and is suggested for prediction of individual hearing-aid use. The aim of this study was to assess the repeatability of the ANL measured in normal-hearing subjec...... using running Danish and non-semantic speech materials as stimuli and modulated speech-spectrum and multi-talker babble noises as competing stimuli....

  19. On risks and acceptability

    International Nuclear Information System (INIS)

    Watson, S.R.

    1981-01-01

    A very attractive notion is that it should be possible not only to determine how much risk is associated with any particular activity, but also to determine if that risk is acceptable. Stated boldly this seems an entirely unobjectionable and indeed a very acceptable notion. There is, however, underlying this idea, a mistaken view of risk which we might refer to as the ''phlogiston'' theory of risk. In this paper, presented at the SRP meeting on Ethical and Legal Aspects of Radiological Protection, the phlogiston theory of risk is described; secondly, it will be argued that it is too simple a theory to be realistic or useful; and thirdly, the management of risk will be placed in a wider decision framework. Acceptability, it will be argued is highly dependent on context, and it is not possible, therefore, to lay down generally applicable notions of acceptability. (author)

  20. NASA Controller Acceptability Study 1(CAS-1) Experiment Description and Initial Observations

    Science.gov (United States)

    Chamberlain, James P.; Consiglio, Maria C.; Comstock, James R., Jr.; Ghatas, Rania W.; Munoz, Cesar

    2015-01-01

    This paper describes the Controller Acceptability Study 1 (CAS-1) experiment that was conducted by NASA Langley Research Center personnel from January through March 2014 and presents partial CAS-1 results. CAS-1 employed 14 air traffic controller volunteers as research subjects to assess the viability of simulated future unmanned aircraft systems (UAS) operating alongside manned aircraft in moderate-density, moderate-complexity Class E airspace. These simulated UAS were equipped with a prototype pilot-in-the-loop (PITL) Detect and Avoid (DAA) system, specifically the Self-Separation (SS) function of such a system based on Stratway+ software to replace the see-and-avoid capabilities of manned aircraft pilots. A quantitative CAS-1 objective was to determine horizontal miss distance (HMD) values for SS encounters that were most acceptable to air traffic controllers, specifically HMD values that were assessed as neither unsafely small nor disruptively large. HMD values between 0.5 and 3.0 nautical miles (nmi) were assessed for a wide array of encounter geometries between UAS and manned aircraft. The paper includes brief introductory material about DAA systems and their SS functions, followed by descriptions of the CAS-1 simulation environment, prototype PITL SS capability, and experiment design, and concludes with presentation and discussion of partial CAS-1 data and results.

  1. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  2. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  3. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  4. Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

    Science.gov (United States)

    Pavlock, Kate M.

    2011-01-01

    Lessons Learne: 1. Design-out unnecessary risk to prevent excessive mitigation management during flight. 2. Consider iterative checkouts to confirm or improve human factor characteristics. 3. Consider the total flight test profile to uncover unanticipated human-algorithm interactions. 4. Consider test card cadence as a metric to assess test readiness. 5. Full-scale flight test is critical to development, maturation, and acceptance of adaptive control laws for operational use.

  5. Perceptions on use of home telemonitoring in patients with long term conditions - concordance with the Health Information Technology Acceptance Model: a qualitative collective case study.

    Science.gov (United States)

    Middlemass, Jo B; Vos, Jolien; Siriwardena, A Niroshan

    2017-06-26

    Health information technology (HIT) may be used to improve care for increasing numbers of older people with long term conditions (LTCs) who make high demands on health and social care services. Despite its potential benefits for reducing disease exacerbations and hospitalisations, HIT home monitoring is not always accepted by patients. Using the Health Information Technology Acceptance Model (HITAM) this qualitative study examined the usefulness of the model for understanding acceptance of HIT in older people (≥60 years) participating in a RCT for older people with Chronic Obstructive Pulmonary Disease (COPD) and associated heart diseases (CHROMED). An instrumental, collective case study design was used with qualitative interviews of patients in the intervention arm of CHROMED. These were conducted at two time points, one shortly after installation of equipment and again at the end of (or withdrawal from) the study. We used Framework Analysis to examine how well the HITAM accounted for the data. Participants included 21 patients aged between 60-99 years and their partners or relatives where applicable. Additional concepts for the HITAM for older people included: concerns regarding health professional access and attachment; heightened illness anxiety and desire to avoid continuation of the 'sick-role'. In the technology zone, HIT self-efficacy was associated with good organisational processes and informal support; while ease of use was connected to equipment design being suitable for older people. HIT perceived usefulness was related to establishing trends in health status, detecting early signs of infection and potential to self-manage. Due to limited feedback to users opportunities to self-manage were reduced. HITAM helped understand the likelihood that older people with LTCs would use HIT, but did not explain how this might result in improved self-management. In order to increase HIT acceptance among older people, equipment design and organisational factors

  6. Safe shutdown analysis for submerged equipment inside containment

    International Nuclear Information System (INIS)

    Song, Dong Soo; Lee, Seung Chan; Yoon, Duk Joo; Ha, Sang Jun

    2017-01-01

    The purpose of the paper is to analyze internal flooding effects on the submerged safety-related components inside containment building. Safe shutdown analysis has been performed based on the criteria, assumptions and guideline provided in ANSI/ANS-56.11-1988 and ANSI/ANS-58.11-1988. Flooding can be postulated from a failure of several systems located inside the containment. Loss of coolant accident (LOCA), Feed water line break (FWLB), and other pipe breaks/cracks are assumed. The worst case flooding scenario is a large break LOCA. The maximum flood level for a large break LOCA is calculated based on the combined inventory of the reactor coolant system, the three accumulators, the boron injection tank (BIT), the chemical additive tank (CAT), and the refueling water storage tank (RWST) flooding the containment. The maximum flood level that could occur from all of the water which is available in containment is 2.3 m from the base elevation. A detailed flooding analysis for the components has been performed to demonstrate that internal flooding resulting from a postulated initiating event does not cause the loss of equipment required to achieve and maintain safe shutdown of the plant, emergency core cooling capability, or equipment whose failure could result in unacceptable offsite radiological consequences. The flood height can be calculated as h = (dh/dt) x (t-t 0 ) + h 0 , where h = time dependent flood height and subscript 0 means the initial value and height slope dh/dt. In summary, the submerged components inside containment are acceptable because they complete the mission of safety injection (SI) prior to submeregency or have no safe shutdown function including containment isolation during an accident. (author)

  7. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  8. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  9. Operations Acceptance Management

    OpenAIRE

    Suchá, Ivana

    2010-01-01

    This paper examines the process of Operations Acceptance Management, whose main task is to control Operations Acceptance Tests (OAT). In the first part the author focuses on the theoretical ground for the problem in the context of ITSM best practices framework ITIL. Benefits, process pitfalls and possibilities for automation are discussed in this part. The second part contains a case study of DHL IT Services (Prague), where a solution optimizing the overall workflow was implemented using simp...

  10. Gerontechnology acceptance by elderly Hong Kong Chinese: a senior technology acceptance model (STAM).

    Science.gov (United States)

    Chen, Ke; Chan, Alan Hoi Shou

    2014-01-01

    The purpose of this study was to develop and test a senior technology acceptance model (STAM) aimed at understanding the acceptance of gerontechnology by older Hong Kong Chinese people. The proposed STAM extended previous technology acceptance models and theories by adding age-related health and ability characteristics of older people. The proposed STAM was empirically tested using a cross-sectional questionnaire survey with a sample of 1012 seniors aged 55 and over in Hong Kong. The result showed that STAM was strongly supported and could explain 68% of the variance in the use of gerontechnology. For older Hong Kong Chinese, individual attributes, which include age, gender, education, gerontechnology self-efficacy and anxiety, and health and ability characteristics, as well as facilitating conditions explicitly and directly affected technology acceptance. These were better predictors of gerontechnology usage behaviour (UB) than the conventionally used attitudinal factors (usefulness and ease of use).

  11. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  12. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  13. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  14. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  15. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  16. Public acceptance of small reactors

    International Nuclear Information System (INIS)

    McDougall, D.S.

    1997-01-01

    The success of any nuclear program requires acceptance by the local public and all levels of government involved in the decision to initiate a reactor program. Public acceptance of a nuclear energy source is a major challenge in successful initiation of a small reactor program. In AECL's experience, public acceptance will not be obtained until the public is convinced that the specific nuclear program is needed, safe and economic and environmental benefit to the community. The title of public acceptance is misleading. The objective of the program is a fully informed public. The program proponent cannot force public acceptance, which is beyond his control. He can, however, ensure that the public is informed. Once information has begun to flow to the public by various means as will be explained later, the proponent is responsible to ensure that the information that is provided by him and by others is accurate. Most importantly, and perhaps most difficult to accomplish, the proponent must develop a consultative process that allows the proponent and the public to agree on actions that are acceptable to the proponent and the community

  17. Equipment performance monitoring in NPP Krsko (Summarized system health report)

    International Nuclear Information System (INIS)

    Djetelic, N.; Cicvaric, D.

    2004-01-01

    Management common goal is safe, reliable, effective, acceptable to public and conservative/cautious operation of NPP Krsko. A set of programs, including Corrective Action Program, Performance Indicators, Operating Experience, Self Assessment and System Health Report, is developed to assist NPP Krsko management in fulfilling those goals. System Health Report is a tool that management can use to quickly assess how selected systems are performing, to determine where additional management attention is required and to determine if appropriate corrective actions have been established. Summarized System Health Report is developed for management's quick overview of systems status, important system malfunctions and problems as well as major changes from previous assessment period. Summarized Report contains nine sections: status difference including brief explanation, selected performance indicators, new equipment problems, functional failures, important problem analyses, action plan for systems with Potential Danger (RED) status, maintenance rule status overview and systems availability (planned and unplanned).(author)

  18. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  19. Influence of different outdoor design conditions on design cooling load and design capacities of air conditioning equipments

    International Nuclear Information System (INIS)

    Aktacir, Mehmet Azmi; Bueyuekalaca, Orhan; Bulut, Huesamettin; Yilmaz, Tuncay

    2008-01-01

    Outdoor design conditions are important parameters for energy efficiency of buildings. The result of incorrect selection of outdoor design conditions can be dramatic in view of comfort and energy consumption. In this study, the influence of different outdoor design conditions on air conditioning systems is investigated. For this purpose, cooling loads and capacities of air conditioning equipments for a sample building located in Adana, Turkey are calculated using different outdoor design conditions recommended by ASHRAE, the current design data used in Turkey and the daily maximum dry and wet bulb temperatures of July 21st, which is generally accepted as the design day. The cooling coil capacities obtained from the different outdoor design conditions considered in this study are compared with each other. The cost analysis of air conditioning systems is also performed. It is seen that the selection of outdoor design conditions is a very critical step in calculation of the building cooling loads and design capacities of air conditioning equipments

  20. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  1. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  2. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  3. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  4. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  5. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  6. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  7. Evaluation of comfort level in desks equipped with two personalized ventilation systems in slightly warm environments

    Energy Technology Data Exchange (ETDEWEB)

    Conceicao, Eusebio Z.E. [Faculdade de Ciencias e Tecnologia - Universidade do Algarve, Campus de Gambelas, 8005-139 Faro (Portugal); Lucio, Manuela J.R. [Agrupamento Vertical Professor Paula Nogueira, R. Comunidade Lusiada, 8700-000 Olhao (Portugal); Rosa, Silvia P.; Custodio, Ana L.V.; Andrade, Renata L.; Meira, Maria J.P.A. [Faculdade de Ciencias do Mar e do Ambiente - Universidade do Algarve, Campus de Gambelas, 8005-139 Faro (Portugal)

    2010-03-15

    In this work the comfort level, namely the thermal comfort, local thermal discomfort and air quality levels, in a classroom with desks equipped with two personalized ventilation systems, in slightly warm environments, is evaluated. A manikin, a ventilated classroom desk, two indoor climate analyzers, a multi-nodal human thermal comfort numerical model and a computational fluid dynamic numerical model, are used. The classroom desk, with double occupation capacity, is used by a student, located in the right side seat. Each personalized ventilation system is equipped with one air terminal device located above the desk writing area, in front to the trunk area, and an other located below the desk writing area, in front to the legs area. The thermal comfort level is evaluated by the developed multi-nodal human thermal comfort numerical model, using a PMV value, the local thermal discomfort level, namely the draught risk and the air velocity fluctuation equivalent frequencies, is evaluated by empirical models, while the air quality level and the detailed airflow around the manikin are evaluated by the computational fluid dynamic numerical model. In the experimental tests the mean air velocity and the turbulence intensity in the upper air terminal device are 3.5 m/s and 9.7%, while in the lower air terminal device are 2.6 m/s and 15.2%. The mean air temperature in the air terminal devices is around 28 C, while the mean radiant temperature in the occupation area, the mean air temperature far from the occupation area and the internal mean air relative humidity were, respectively, 28 C, 28 C and 50%. The air velocity and temperature around the occupant are measured around 15 human body sections. The actual personalized ventilation system, which promotes an ascendant airflow around the occupant with highest air renovation rate in the respiration area, promotes acceptable thermal comfort conditions and air quality in the respiration area in accord to the present standards. The

  8. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  9. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  10. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  11. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  12. LHC Report: Beam on

    CERN Multimedia

    Rossano Giachino for the LHC Team

    2012-01-01

    The powering tests described in the last edition of the Bulletin were successfully finished at the end of the first week of March opening the way for 4 TeV operations this year. The beam was back in the machine on Wednesday 14 March. The first collisions at 4 TeV are scheduled for the first week of April.   The first beam of 2012 is dumped after making a few rounds in the LHC. The magnet powering tests were followed by the machine checkout phase. Here the operations team in collaboration with the equipment groups performs a sequence of tests to ensure the readiness of the LHC for beam. The tests include driving all the LHC systems – beam dump, injection, collimation, RF, power converters, magnet circuits, vacuum, interlocks, controls, timing and synchronization – through the operational cycle. The “checkout phase” is really a massive de-bugging exercise, which is performed with the objective of ensuring the proper functioning of the whole machine and t...

  13. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  14. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  15. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  16. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  17. 42 CFR 137.138 - Once the Indian Tribe's final offer has been accepted or deemed accepted by operation of law...

    Science.gov (United States)

    2010-10-01

    ... accepted or deemed accepted by operation of law, what is the next step? 137.138 Section 137.138 Public... final offer has been accepted or deemed accepted by operation of law, what is the next step? After the... the acceptance or the deemed acceptance. Rejection of Final Offers ...

  18. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  19. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  20. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  1. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  2. Probabilistic relationships in acceptable risk studies

    International Nuclear Information System (INIS)

    Benjamin, J.R.

    1977-01-01

    Acceptable risk studies involve uncertainties in future events; consequences and associated values, the acceptability levels, and the future decision environment. Probabilistic procedures afford the basic analytical tool to study the influence of each of these parameters on the acceptable risk decision, including their interrelationships, and combinations. A series of examples are presented in the paper in increasing complexity to illustrate the principles involved and to quantify the relationships to the acceptable risk decision. The basic objective of such studies is to broaden the scientific basis of acceptable risk decision making. It is shown that rationality and consistency in decision making is facilitated by such studies and that rather simple relationships exist in many situations of interest. The variation in criteria associated with an increase in the state of knowledge or change in the level of acceptability is also discussed. (Auth.)

  3. Probabilistic relationships in acceptable risk studies

    International Nuclear Information System (INIS)

    Benjamin, J.R.

    1977-01-01

    Acceptable risk studies involve uncertainties in future events: consequences and associated values, the acceptability levels, and the future decision environment. Probabilistic procedures afford the basic analytical tool to study the influence of each of these parameters on the acceptable risk decision, including their interrelationships, and combinations. A series of examples are presented in the paper in increasing complexity to illustrate the principles involved and to quantify the relationships to the acceptable risk decision. The basic objective of such studies is to broaden the scientific basis of acceptable risk decision making. It is shown that rationality and consistency in decision making is facilitated by such studies and that rather simple relationships exist in many situations of interest. The variation in criteria associated with an increase in the state of knowledge or change in the level of acceptability is also discussed

  4. Technology, Demographic Characteristics and E-Learning Acceptance: A Conceptual Model Based on Extended Technology Acceptance Model

    Science.gov (United States)

    Tarhini, Ali; Elyas, Tariq; Akour, Mohammad Ali; Al-Salti, Zahran

    2016-01-01

    The main aim of this paper is to develop an amalgamated conceptual model of technology acceptance that explains how individual, social, cultural and organizational factors affect the students' acceptance and usage behaviour of the Web-based learning systems. More specifically, the proposed model extends the Technology Acceptance Model (TAM) to…

  5. Investigating Students' Acceptance of a Statistics Learning Platform Using Technology Acceptance Model

    Science.gov (United States)

    Song, Yanjie; Kong, Siu-Cheung

    2017-01-01

    The study aims at investigating university students' acceptance of a statistics learning platform to support the learning of statistics in a blended learning context. Three kinds of digital resources, which are simulations, online videos, and online quizzes, were provided on the platform. Premised on the technology acceptance model, we adopted a…

  6. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  7. American acceptance of nuclear power

    International Nuclear Information System (INIS)

    Barrett, W.

    1980-01-01

    The characteristic adventurous spirit that built American technology will eventually lead to American acceptance of nuclear power unless an overpowering loss of nerve causes us to reject both nuclear technology and world leadership. The acceptance of new technology by society has always been accompanied by activist opposition to industralization. To resolve the debate between environmental and exploitive extremists, we must accept with humility the basic premise that human accomplishment is a finite part of nature

  8. Tacit acceptance of the succession

    Directory of Open Access Journals (Sweden)

    Ioana NICOLAE

    2012-01-01

    Full Text Available This paper examines some essential and contradictory aspects regarding the issue of tacit acceptance of succession in terms of distinction between documents valuing tacit acceptance of succession and other acts that would not justify such a solution. The documents expressly indicated by the legislator as having tacit acceptance value as well as those which do not have such value are presented and their most important legal effects are examined and discussed.

  9. Approaches to acceptable risk

    International Nuclear Information System (INIS)

    Whipple, C.

    1997-01-01

    Several alternative approaches to address the question open-quotes How safe is safe enough?close quotes are reviewed and an attempt is made to apply the reasoning behind these approaches to the issue of acceptability of radiation exposures received in space. The approaches to the issue of the acceptability of technological risk described here are primarily analytical, and are drawn from examples in the management of environmental health risks. These include risk-based approaches, in which specific quantitative risk targets determine the acceptability of an activity, and cost-benefit and decision analysis, which generally focus on the estimation and evaluation of risks, benefits and costs, in a framework that balances these factors against each other. These analytical methods tend by their quantitative nature to emphasize the magnitude of risks, costs and alternatives, and to downplay other factors, especially those that are not easily expressed in quantitative terms, that affect acceptance or rejection of risk. Such other factors include the issues of risk perceptions and how and by whom risk decisions are made

  10. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  11. Determination of Anthracycline Drug Residual in Cleaning Validation Swabs of Stainless-Steel Equipment after Production of Cytostatic Injections Using HPLC Analytical Method

    Directory of Open Access Journals (Sweden)

    Zuzana Slivová

    2015-01-01

    Full Text Available Standard cleaning procedures of production line equipment were verified after manufacture of cytostatic injections containing Anthracycline derivate substance. Residual content of Anthracycline drug substance on stainless-steel equipment surface was determined using swab sampling with a specific HPLC-DAD analysis. The acceptance limit was decided as 200.0 μg/100 cm2. Recovery from the stainless-steel surface was 90.1%. Linearity of the method was observed in the concentration range of 0.155–194 μg/mL when estimated using Zorbax TMS (5 μm, 0.25 m × 4.6 mm ID column at 1.3 mL/min flow rate and 254 nm (DAD 190–600 nm. The mobile phase consisted of lauryl hydrogen sulphate solution (3.7 g/L : methanol : acetonitrile (54 : 16 : 30, v/v/v with pH adjusted to 2.5 using phosphoric acid (85%. The LOD and LOQ for Anthracycline derivate were found to be 0.047 and 0.155 μg/mL, respectively. The method validation confirmed the method provides acceptable degree of selectivity, linearity, accuracy, and precision for the intended purposes.

  12. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  13. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  14. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  15. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  16. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  17. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  18. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  19. Self-acceptance of stuttering: A preliminary study.

    Science.gov (United States)

    De Nardo, Thales; Gabel, Rodney M; Tetnowski, John A; Swartz, Eric R

    2016-01-01

    This study explored the relationship between self-acceptance of stuttering and (1) psychosocial factors (self-esteem, hostility towards others, emotional support, and perceived discrimination); (2) treatment history (support group participation, therapy duration, and perceived therapy success); and (3) previously reported variables in self-acceptance of stuttering, which include age and stuttering severity. Participants were 80 adults who stutter who were recruited with assistance from the National Stuttering Association and Board Certified Specialists in Fluency Disorders. Participants completed an electronic survey composed of an acceptance of stuttering scale, psychosocial scales, and a participant information questionnaire. Statistical analysis identified significant correlations between participants' reports of self-acceptance of stuttering and self-esteem, perceived discrimination, hostility towards others, and perceived therapy outcome. Self-esteem was positively correlated with self-acceptance, while hostility towards others and perceived discrimination was negatively correlated with self-acceptance. Participants who perceived their therapy outcome to be successful were significantly more likely to report higher levels of self-acceptance. No significant relationships were found between self-acceptance of stuttering and support group participation, emotional support, stuttering severity, and participant age. This exploratory investigation has provided a foundation for future studies on the self-acceptance of stuttering. The findings indicate common psychosocial variables in self-acceptance of stuttering and of other disabilities. The significant relationships between self-acceptance of stuttering and psychosocial and therapeutic variables found need to be further explored to identify its causalities and clinical implications. The reader will be able to (1) discuss the importance of assessing self-acceptance of stuttering, (2) summarize the literature on self-acceptance

  20. Differentiated influences of risk perceptions on nuclear power acceptance according to acceptance targets: Evidence from Korea

    International Nuclear Information System (INIS)

    Roh, Seung Kook; Lee, Jin Won

    2017-01-01

    The determinants of the public's nuclear power acceptance have received considerable attention as decisive factors regarding nuclear power policy. However, the contingency of the relative importance of different determinants has been less explored. Building on the literature of psychological distance between the individual and the object, the present study demonstrates that the relative effects of different types of perceived risks regarding nuclear power generation differ across acceptance targets. Using a sample of Korea, our results show that, regarding national acceptance of nuclear power generation, perceived risk from nuclear power plants exerts a stronger negative effect than that from radioactive waste management; however, the latter exerts a stronger negative effect than the former on local acceptance of a nuclear power plant. This finding provides implications for efficient public communication strategy to raise nuclear power acceptance

  1. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  2. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  3. Older Adults' Acceptance of Information Technology

    Science.gov (United States)

    Wang, Lin; Rau, Pei-Luen Patrick; Salvendy, Gavriel

    2011-01-01

    This study investigated variables contributing to older adults' information technology acceptance through a survey, which was used to find factors explaining and predicting older adults' information technology acceptance behaviors. Four factors, including needs satisfaction, perceived usability, support availability, and public acceptance, were…

  4. Monitoring device acceptance in implantable cardioverter defibrillator patients using the Florida Patient Acceptance Survey

    DEFF Research Database (Denmark)

    Versteeg, Henneke; Starrenburg, Annemieke; Denollet, Johan

    2012-01-01

    Patient device acceptance might be essential in identifying patients at risk for adverse patient-reported outcomes following implantation of an implantable cardioverter defibrillator (ICD). We examined the validity and reliability of the Florida Patient Acceptance Scale (FPAS) and identified corr...

  5. Seismic qualification of equipment in operating nuclear power plants. Unresolved safety issue A-46, draft report for comment

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1985-08-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants should be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46 by the Nuclear Regulatory Commission staff and its contractors, Idaho National Engineering Laboratory, Southwest Research Institute, Brookhaven National Laboratory, and Lawrence Livermore National Laboratory. In addition, the collection and review of seismic experience data by the Seismic Qualification Utility Group and the review and recommendations of a group of seismic consultants, the Senior Seismic Review Advisory Panel, are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experience data base

  6. Wind power: basic challenge concerning social acceptance

    NARCIS (Netherlands)

    Wolsink, M.; Meyers, R.A.

    2012-01-01

    This reference article gives an overview of social acceptance (acceptance by all relevant actors in society) of all relevant aspects of implementation and diffusion of wind power. In social acceptance three dimensions of acceptance are distinguished (socio-political -; community -; market

  7. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  8. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  9. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  10. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  11. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  12. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  13. 30 CFR 75.524 - Electric face equipment; electric equipment used in return air outby the last open crosscut...

    Science.gov (United States)

    2010-07-01

    ... used in return air outby the last open crosscut; maximum level of alternating or direct electric... other in return air outby the last open crosscut, shall not exceed one ampere as determined from the... Electrical Equipment-General § 75.524 Electric face equipment; electric equipment used in return air outby...

  14. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  15. Differentiated influences of risk perceptions on nuclear power acceptance according to acceptance targets: Evidence from Korea

    Directory of Open Access Journals (Sweden)

    Seungkook Roh

    2017-08-01

    Full Text Available The determinants of the public's nuclear power acceptance have received considerable attention as decisive factors regarding nuclear power policy. However, the contingency of the relative importance of different determinants has been less explored. Building on the literature of psychological distance between the individual and the object, the present study demonstrates that the relative effects of different types of perceived risks regarding nuclear power generation differ across acceptance targets. Using a sample of Korea, our results show that, regarding national acceptance of nuclear power generation, perceived risk from nuclear power plants exerts a stronger negative effect than that from radioactive waste management; however, the latter exerts a stronger negative effect than the former on local acceptance of a nuclear power plant. This finding provides implications for efficient public communication strategy to raise nuclear power acceptance.

  16. Differentiated influences of risk perceptions on nuclear power acceptance according to acceptance targets: Evidence from Korea

    Energy Technology Data Exchange (ETDEWEB)

    Roh, Seung Kook [Policy Research Center, Korea Atomic Energy Research Institute (KAERI), Daejeon (Korea, Republic of); Lee, Jin Won [School of Management, Xiamen University, Xiamen (China)

    2017-08-15

    The determinants of the public's nuclear power acceptance have received considerable attention as decisive factors regarding nuclear power policy. However, the contingency of the relative importance of different determinants has been less explored. Building on the literature of psychological distance between the individual and the object, the present study demonstrates that the relative effects of different types of perceived risks regarding nuclear power generation differ across acceptance targets. Using a sample of Korea, our results show that, regarding national acceptance of nuclear power generation, perceived risk from nuclear power plants exerts a stronger negative effect than that from radioactive waste management; however, the latter exerts a stronger negative effect than the former on local acceptance of a nuclear power plant. This finding provides implications for efficient public communication strategy to raise nuclear power acceptance.

  17. Acceptability of multipurpose human papillomavirus vaccines among providers and mothers of adolescent girls: A mixed-methods study in five countries

    Directory of Open Access Journals (Sweden)

    Nadja A. Vielot

    2017-06-01

    Full Text Available Introduction: Multipurpose vaccines (MPVs could be formulated to prevent multiple sexually transmitted infections simultaneously. Little is known about acceptability of MPVs among vaccine health care providers (HCPs or mothers of adolescent girls. Methods: 151 adolescent vaccine providers and 118 mothers of adolescent girls aged 9–14 were recruited from five geographically-diverse countries: Argentina, Malaysia, South Africa, South Korea, and Spain. We assessed providers’ preferences for single-purpose human papillomavirus (HPV vaccine versus MPVs (including HPV+herpes simplex virus (HSV−2, HPV+HIV, or HPV+HSV-2+HIV via quantitative surveys. Maternal MPV attitudes were assessed in four focus group discussions (FGDs in each country. Results: Most providers preferred MPVs over single-purpose HPV vaccination, with preference ranging from 61% in Malaysia to 96% in South Africa. HPV+HSV-2+HIV was the most preferred MPV formulation (56–82%. Overall, 53% of the mothers preferred MPVs over single-purpose HPV vaccines, with strongest support in South Africa (90% and lowest support in South Korea (29%. Convenience and trust in the health care system were commonly-cited reasons for MPV acceptability. Safety and efficacy concerns were common barriers to accepting MPVs, though specific concerns differed by country. Across FGDs, additional safety and efficacy information on MPVs were requested, particularly from trusted sources like HCPs. Conclusions: Though maternal acceptability of MPVs varied by country, MPV acceptability would be enhanced by having HCPs provide parents with additional MPV vaccine safety and efficacy information. While most providers preferred MPVs, future health behavior research should identify acceptability barriers, and targeted provider interventions should equip providers to improve vaccination discussions with parents. Keywords: Vaccines, Acceptability, Multipurpose, Human papillomavirus, Sexually transmitted

  18. 46 CFR 28.73 - Accepted organizations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Accepted organizations. 28.73 Section 28.73 Shipping... INDUSTRY VESSELS General Provisions § 28.73 Accepted organizations. An organization desiring to be designated by the Commandant as an accepted organization must request such designation in writing. As a...

  19. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  20. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  1. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  2. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Dong Hee; KIm, Hyeong Gyun [Dept. of Radiological Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test.

  3. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    International Nuclear Information System (INIS)

    Hong, Dong Hee; KIm, Hyeong Gyun

    2016-01-01

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test

  4. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  5. Future development of IR thermovision weather satellite equipment

    Science.gov (United States)

    Listratov, A. V.

    1974-01-01

    The self radiation of the surface being viewed is used for image synthesis in IR thermovision equipment. The installation of such equipment aboard weather satellites makes it possible to obtain cloud cover pictures of the earth's surface in a complete orbit, regardless of the illumination conditions, and also provides quantitative information on the underlying surface temperature and cloud top height. Such equipment is used successfully aboard the Soviet satellites of the Meteor system, and experimentally on the American satellites of the Nimbus series. With regard to surface resolution, the present-day IR weather satellite equipment is inferior to the television equipment. This is due primarily to the comparatively low detectivity of the IR detectors used. While IR equipment has several fundamental advantages in comparison with the conventional television equipment, the problem arises of determining the possibility for future development of weather satellite IR thermovision equipment. Criteria are examined for evaluating the quality of IR.

  6. Methods for verifying compliance with low-level radioactive waste acceptance criteria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-01

    This report summarizes the methods that are currently employed and those that can be used to verify compliance with low-level radioactive waste (LLW) disposal facility waste acceptance criteria (WAC). This report presents the applicable regulations representing the Federal, State, and site-specific criteria for accepting LLW. Typical LLW generators are summarized, along with descriptions of their waste streams and final waste forms. General procedures and methods used by the LLW generators to verify compliance with the disposal facility WAC are presented. The report was written to provide an understanding of how a regulator could verify compliance with a LLW disposal facility`s WAC. A comprehensive study of the methodology used to verify waste generator compliance with the disposal facility WAC is presented in this report. The study involved compiling the relevant regulations to define the WAC, reviewing regulatory agency inspection programs, and summarizing waste verification technology and equipment. The results of the study indicate that waste generators conduct verification programs that include packaging, classification, characterization, and stabilization elements. The current LLW disposal facilities perform waste verification steps on incoming shipments. A model inspection and verification program, which includes an emphasis on the generator`s waste application documentation of their waste verification program, is recommended. The disposal facility verification procedures primarily involve the use of portable radiological survey instrumentation. The actual verification of generator compliance to the LLW disposal facility WAC is performed through a combination of incoming shipment checks and generator site audits.

  7. Methods for verifying compliance with low-level radioactive waste acceptance criteria

    International Nuclear Information System (INIS)

    1993-09-01

    This report summarizes the methods that are currently employed and those that can be used to verify compliance with low-level radioactive waste (LLW) disposal facility waste acceptance criteria (WAC). This report presents the applicable regulations representing the Federal, State, and site-specific criteria for accepting LLW. Typical LLW generators are summarized, along with descriptions of their waste streams and final waste forms. General procedures and methods used by the LLW generators to verify compliance with the disposal facility WAC are presented. The report was written to provide an understanding of how a regulator could verify compliance with a LLW disposal facility's WAC. A comprehensive study of the methodology used to verify waste generator compliance with the disposal facility WAC is presented in this report. The study involved compiling the relevant regulations to define the WAC, reviewing regulatory agency inspection programs, and summarizing waste verification technology and equipment. The results of the study indicate that waste generators conduct verification programs that include packaging, classification, characterization, and stabilization elements. The current LLW disposal facilities perform waste verification steps on incoming shipments. A model inspection and verification program, which includes an emphasis on the generator's waste application documentation of their waste verification program, is recommended. The disposal facility verification procedures primarily involve the use of portable radiological survey instrumentation. The actual verification of generator compliance to the LLW disposal facility WAC is performed through a combination of incoming shipment checks and generator site audits

  8. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  9. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  10. Credit in Acceptance Sampling on Attributes

    NARCIS (Netherlands)

    Klaassen, Chris A.J.

    2000-01-01

    Credit is introduced in acceptance sampling on attributes and a Credit Based Acceptance sampling system is developed that is very easy to apply in practice.The credit of a producer is defined as the total number of items accepted since the last rejection.In our sampling system the sample size for a

  11. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  12. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  13. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  14. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  15. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  16. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  17. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  18. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  19. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  20. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  1. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  2. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  3. 12 CFR 412.7 - Conditions for acceptance.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Conditions for acceptance. 412.7 Section 412.7 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES ACCEPTANCE OF PAYMENT FROM A NON-FEDERAL SOURCE FOR TRAVEL EXPENSES § 412.7 Conditions for acceptance. (a) Eximbank may accept payment for...

  4. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  5. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  6. Consumer acceptance of functional foods

    DEFF Research Database (Denmark)

    Frewer, Lynn J.; Scholderer, Joachim; Lambert, Nigel

    2003-01-01

    In the past, it has been assumed that consumers would accept novel foods if there is a concrete and tangible consumer benefit associated with them, which implies that those functional foods would quickly be accepted. However, there is evidence that individuals are likely to differ in the extent...... to which they are likely to buy products with particular functional properties. Various cross-cultural and demographic differences in acceptance found in the literature are reviewed, as well as barriers to dietary change. In conclusion, it is argued that understanding consumer's risk perceptions...

  7. A Study on Performance and Safety Tests of Defibrillator Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2017-12-01

    Nowadays, more than 10,000 different types of medical devices can be found in hospitals. This way, medical electrical equipment is being employed in a wide variety of fields in medical sciences with different physiological effects and measurements. Hospitals and medical centers must ensure that their critical medical devices are safe, accurate, reliable and operational at the required level of performance. Defibrillators are critical resuscitation devices. The use of reliable defibirillators has led to more effective treatments and improved patient safety through better control and management of complications during Cardiopulmonary Resuscitation (CPR). The metrological reliability of twenty frequent use, manual defibrillators in use ten hospitals (4 private and 6 public) in one of the provinces of Iran according to international and national standards was evaluated. Quantitative analysis of control and instrument accuracy showed the amount of the obtained results in many units are critical which had less value over the standard limitations especially in devices with poor battery. For the accuracy of delivered energy analysis, only twelve units delivered acceptable output values and the precision in the output energy measurements especialy in weak battry condition, after activation of discharge alarm, were low. Obtained results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially for high risk instruments. It is also necessary to provide training courses on the fundumentals of operation and performane parameters for medical staff in the field of meterology in medicine and how one can get good accuracy results especially in high risk medical devices.

  8. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  9. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  10. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  11. Management of radiological related equipments. Creating the equipment management database and analysis of the repair and maintenance records

    International Nuclear Information System (INIS)

    Eguchi, Megumu; Taguchi, Keiichi; Oota, Takashi; Kajiwara, Hiroki; Ono, Kiyotune; Hagio, Kiyofumi; Uesugi, Ekizo; Kajishima, Tetuo; Ueda, Kenji

    2002-01-01

    In 1997, we established the committee of equipments maintenance and management in our department. We designed the database in order to classify and register all the radiological related equipments using Microsoft Access. The management of conditions and cost of each equipment has become easier, by keeping and recording the database in the equipments management ledger and by filing the history of repairs or maintenances occurred to modalities. We then accounted numbers, cost of repairs and downtimes from the data of the repair and maintenance records for four years, and we reexamined the causal analysis of failures and the contents of the regular maintenance for CT and MRI equipments that had shown the higher numbers of repairs. Consequently, we have found the improvement of registration method of the data and the more economical way to use of the cost of repair. (author)

  12. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  13. 40 CFR 63.1434 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1434... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1434 Equipment leak provisions. (a) The owner or operator of each affected source shall comply with the HON equipment leak...

  14. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  15. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  16. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  17. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  18. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  19. 14 CFR 25.1439 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... also enable the flightcrew to use radio equipment. (4) The part of the equipment protecting the eyes... Regulations: (1) The equipment must be designed to protect the appropriate crewmember from smoke, carbon... must include— (i) Masks covering the eyes, nose and mouth, or (ii) Masks covering the nose and mouth...

  20. 40 CFR 63.769 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.769... § 63.769 Equipment leak standards. (a) This section applies to equipment subject to this subpart and... release to detect leaks, except under the following conditions. (i) The owner or operator has obtained...

  1. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  2. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  3. Optimization of rotating equipment in offshore wind farm

    International Nuclear Information System (INIS)

    Okunade, O A

    2014-01-01

    The paper considered the improvement of rotating equipment in a wind farm, and how these could maximise the farm power capacity. It aimed to increase capacity of electricity generation through a renewable source in UK and contribute to 15 per cent energy- consumption target, set by EU on electricity through renewable sources by 2020. With reference to a case study in UK offshore wind farm, the paper analysed the critique of the farm, as a design basis for its optimization. It considered power production as design situation, load cases and constraints, in order to reflect characteristics and behaviour of a standard design. The scope, which considered parts that were directly involved in power generation, covered rotor blades and the impacts of gearbox and generator to power generation. The scope did not however cover support structures like tower design. The approaches of detail data analysis of the blade at typical wind load conditions, were supported by data from acceptable design standards, relevant authorities and professional bodies. The findings in proposed model design showed at least over 3 per cent improvement on the existing electricity generation. It also indicated overall effects on climate change

  4. Optimization of rotating equipment in offshore wind farm

    Science.gov (United States)

    Okunade, O. A.

    2014-07-01

    The paper considered the improvement of rotating equipment in a wind farm, and how these could maximise the farm power capacity. It aimed to increase capacity of electricity generation through a renewable source in UK and contribute to 15 per cent energy- consumption target, set by EU on electricity through renewable sources by 2020. With reference to a case study in UK offshore wind farm, the paper analysed the critique of the farm, as a design basis for its optimization. It considered power production as design situation, load cases and constraints, in order to reflect characteristics and behaviour of a standard design. The scope, which considered parts that were directly involved in power generation, covered rotor blades and the impacts of gearbox and generator to power generation. The scope did not however cover support structures like tower design. The approaches of detail data analysis of the blade at typical wind load conditions, were supported by data from acceptable design standards, relevant authorities and professional bodies. The findings in proposed model design showed at least over 3 per cent improvement on the existing electricity generation. It also indicated overall effects on climate change.

  5. The perceived feasibility and acceptability of a conceptually challenging exercise training program in older adults

    Directory of Open Access Journals (Sweden)

    Miller CT

    2018-03-01

    Full Text Available Clint T Miller,1 Megan Teychenne,2 Jaimie-Lee Maple2 1School of Exercise and Nutrition Sciences, Deakin University, Geelong, VIC, Australia; 2Institute for Physical Activity and Nutrition (IPAN, School of Exercise and Nutrition Sciences, Deakin University, Geelong, VIC, Australia Background: Exercise training is an essential component of falls prevention strategies, but they do not fully address components of physical function that leads to falls. The training approaches to achieve this may not be perceived as appropriate or even feasible in older adults. This study aims to assess the perceived feasibility and acceptability of novel exercise training approaches not usually prescribed to older adults. Patients and methods: Fourteen adults were exposed to conceptually and physically demanding exercises. Interviews were then conducted to determine perceptions and acceptability of individual exercise tasks. Qualitative thematic analysis was used to identify themes. Results: Safety and confidence, acceptability, and population participation were the key themes identified. Staff knowledge, presence, program design, and overt safety equipment were important for alleviating initial apprehension. Although physically demanding, participants expressed satisfaction when challenged. Prior disposition, understanding the value, and the appeal of novel exercises were perceived to influence program engagement. Conclusion: Given the evidence for acceptability, this type of training is feasible and may be appropriate as part of an exercise training program for older adults. Further research should be conducted to confirm that the physical adaptations to exercise training approaches as presented in this study occur in a similar manner to that observed in younger adults, and to also determine whether these adaptations lead to prolonged independence and reduced falls in older adults compared to usual care. Keywords: falls, balance, qualitative analysis, thematic

  6. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  7. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  8. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2001-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  9. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  10. Sustainability and acceptance - new challenges for nuclear energy

    International Nuclear Information System (INIS)

    Lensa, W. von

    2001-01-01

    This paper discusses the concept of sustainability in relation to acceptance of nuclear energy. Acceptance is viewed in terms of public acceptance, industrial acceptance, and internal acceptance/consensus within the nuclear community. It addresses sustainability criteria, the need for innovation, and the different levels of acceptability. The mechanisms of risk perception are discussed along with the technological consequences from risk perception mechanisms leading to specific objections against nuclear energy. (author)

  11. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  12. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  13. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  14. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  15. 46 CFR 71.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...

  16. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  17. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  18. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  19. Nuclear Energy and Public Acceptance

    International Nuclear Information System (INIS)

    Daifuku, K.

    2002-01-01

    The continued use of nuclear power in the European Union and elsewhere requires an adequate level of public and political acceptance. A lack of acceptance is often mistakenly cited as a reason for the slowdown in nuclear power plant construction in Western Europe and as a justification for abandoning nuclear power. In fact, the reasons for the slowdown have more to do with the following two factors: Plentiful supplies of low-priced natural gas, making gas-fired power plants a more attractive investment choice; more than adequate supplies of electricity which have curbed the need for the construction of new plant of any kind. In general, moves towards a withdrawal from nuclear in certain Community countries have been due to party political pressures and have not been a response to public opposition to nuclear. In addition, opinion polls do not show widespread public opposition to the use of nuclear power. Figures consistently indicate that the use of nuclear power does not come high on the list of most people's main worries. Their main concerns focus on other issues such as crime and financial problems. In the main, electricity is taken for granted in the industrialised world. Electric power only becomes an issue when there is a threat of shortages. So if public acceptance is not the main obstacle, what is? Political acceptance is an integral part of the process in which nuclear becomes acceptable or not. The relationship between public and political acceptance and the role of the industry in this context, on how to foster a better trialogue, will be examined. (author)

  20. Acceptability of GM foods among Pakistani consumers

    Science.gov (United States)

    Ali, Akhter; Rahut, Dil Bahadur; Imtiaz, Muhammad

    2016-01-01

    ABSTRACT In Pakistan majority of the consumers do not have information about genetically modified (GM) foods. In developing countries particularly in Pakistan few studies have focused on consumers' acceptability about GM foods. Using comprehensive primary dataset collected from 320 consumers in 2013 from Pakistan, this study analyzes the determinants of consumers' acceptability of GM foods. The data was analyzed by employing the bivariate probit model and censored least absolute deviation (CLAD) models. The empirical results indicated that urban consumers are more aware of GM foods compared to rural consumers. The acceptance of GM foods was more among females' consumers as compared to male consumers. In addition, the older consumers were more willing to accept GM food compared to young consumers. The acceptability of GM foods was also higher among wealthier households. Low price is the key factor leading to the acceptability of GM foods. The acceptability of the GM foods also reduces the risks among Pakistani consumers. PMID:27494790

  1. Acceptability of GM foods among Pakistani consumers.

    Science.gov (United States)

    Ali, Akhter; Rahut, Dil Bahadur; Imtiaz, Muhammad

    2016-04-02

    In Pakistan majority of the consumers do not have information about genetically modified (GM) foods. In developing countries particularly in Pakistan few studies have focused on consumers' acceptability about GM foods. Using comprehensive primary dataset collected from 320 consumers in 2013 from Pakistan, this study analyzes the determinants of consumers' acceptability of GM foods. The data was analyzed by employing the bivariate probit model and censored least absolute deviation (CLAD) models. The empirical results indicated that urban consumers are more aware of GM foods compared to rural consumers. The acceptance of GM foods was more among females' consumers as compared to male consumers. In addition, the older consumers were more willing to accept GM food compared to young consumers. The acceptability of GM foods was also higher among wealthier households. Low price is the key factor leading to the acceptability of GM foods. The acceptability of the GM foods also reduces the risks among Pakistani consumers.

  2. Consumer Acceptance of Novel Foods

    NARCIS (Netherlands)

    Fischer, A.R.H.; Reinders, M.J.

    2016-01-01

    The success of novel foods depends to a considerable extent on whether consumers accept those innovations. This chapter provides an overview of current knowledge relevant to consumer acceptance of innovations in food. A broad range of theories and approaches to assess consumer response to

  3. 33 CFR 142.24 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.24 Use of equipment. (a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or...

  4. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  5. 27 CFR 6.43 - Sale of equipment.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Furnishing Things of Value § 6.43 Sale of equipment. A transaction in which equipment is sold to a retailer by an industry member, except as provided.... Further, the negotiation by an industry member of a special price to a retailer for equipment from an...

  6. 46 CFR 28.130 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Survival craft equipment. 28.130 Section 28.130 Shipping... INDUSTRY VESSELS Requirements for All Vessels § 28.130 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, effective for the purpose it is intended to serve, and...

  7. Impact of an Acceptance Facilitating Intervention on Patients' Acceptance of Internet-based Pain Interventions: A Randomized Controlled Trial.

    Science.gov (United States)

    Baumeister, Harald; Seifferth, Holger; Lin, Jiaxi; Nowoczin, Lisa; Lüking, Marianne; Ebert, David

    2015-06-01

    Results from clinical trials indicate that Internet-based psychological pain interventions are effective in treating chronic pain. However, little is known about patients' acceptance of these programs and how to positively influence patients' intention to engage in them. Therefore, the present study aimed (1) to assess patients' acceptance of Internet-based interventions, and (2) to examine whether patients' acceptance can be increased by an acceptance facilitating intervention. A total of 104 patients with chronic pain from 2 pain units were randomly allocated to an intervention group (IG) and a no-intervention control group (CG). The IG was shown a short informational video about Internet-based psychological pain interventions before receiving a questionnaire on patients' acceptance of Internet-based psychological pain interventions and predictors of acceptance (performance expectancy, effort expectancy, social influence, facilitating conditions, Internet usage, and Internet anxiety). The CG filled out the questionnaire immediately. Patients' acceptance was measured with a 4-item scale (sum score ranging from 4 to 20). Baseline acceptance of Internet-based interventions was reported as low (sum-score:4-9) by 53.8%, moderate (10 to 15) by 42.3%, and high (16 to 20) by 3.9% of the patients with chronic pain in the CG. The IG showed a significantly higher acceptance (M = 12.17, SD = 4.22) than the CG (M = 8.94, SD = 3.71) with a standardized mean difference of d = 0.81 (95% CI, 0.41, 1.21). All predictor variables were significantly improved in the IG compared with the CG, except for Internet usage. Patients with chronic pain display a relatively low acceptance of Internet-based psychological pain interventions, which can be substantially increased by a short informational video.

  8. The UK market for gaseous emissions control equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The report analyses the changes in demand for gaseous emissions control equipment in the United Kingdom over the next 5 years. It discusses the factors affecting demand such as legislation reporting of environmental performance, and economic factors. It looks at environmental expenditure by UK industry. Markets are examined, for VOC abatement systems; thermal incinerators; adsorption equipment; catalytic oxidisers; absorption equipment; biological treatments; cryogenic equipment; SO{sub x} abatement equipment; wet FGD; wet dry FGD, dry scrubbers; NOx abatement systems; selective catalytic reduction; and selective non-catalytic reduction. Profiles are given of 16 leading suppliers.

  9. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  10. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  11. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  12. Evaluation of the Acceptance of Audience Response System by Corporations Using the Technology Acceptance Model

    Science.gov (United States)

    Chu, Hsing-Hui; Lu, Ta-Jung; Wann, Jong-Wen

    The purpose of this research is to explore enterprises' acceptance of Audience Response System (ARS) using Technology Acceptance Model (TAM). The findings show that (1) IT characteristics and facilitating conditions could be external variables of TAM. (2) The degree of E-business has positive significant correlation with behavioral intention of employees. (3) TAM is a good model to predict and explain IT acceptance. (4) Demographic variables, industry and firm characteristics have no significant correlation with ARS acceptance. The results provide useful information to managers and ARS providers that (1) ARS providers should focus more on creating different usages to enhance interactivity and employees' using intention. (2) Managers should pay attention to build sound internal facilitating conditions for introducing IT. (3) According to the degree of E-business, managers should set up strategic stages of introducing IT. (4) Providers should increase product promotion and also leverage academic and government to promote ARS.

  13. Assessment of Patients’ Perception of Telemedicine Services Using the Service User Technology Acceptability Questionnaire

    Directory of Open Access Journals (Sweden)

    Claudio Dario

    2016-06-01

    Full Text Available Introduction: The purpose of this paper is to assess if similar telemedicine services integrated in the management of different chronic diseases are acceptable and well perceived by patients or if there are any negative perceptions. Theory and methods: Participants suffering from different chronic diseases were enrolled in Veneto Region and gathered into clusters. Each cluster received a similar telemedicine service equipped with different disease-specific measuring devices. Participants were patients with diabetes (n = 163, chronic obstructive pulmonary disease (n = 180, congestive heart failure (n = 140 and Cardiac Implantable Electronic Devices (n = 1635. The Service User Technology Acceptability Questionnaire (SUTAQ was initially translated, culturally adapted and pretested and subsequently used to assess patients’ perception of telemedicine. Data were collected after 3 months and after 12 months from the beginning of the intervention. Data for patients with implantable devices was collected only at 12 months. Results: Results at 12 months for all clusters are similar and assessed a positive perception of telemedicine. The SUTAQ results for clusters 2 (diabetes, 5 (COPD and 7 (CHF after 3 months of intervention were confirmed after 12 months. Conclusions: Telemedicine was perceived as a viable addition to usual care. A positive perception for telemedicine services isn’t a transitory effect, but extends over the course of time.

  14. Assessment of Patients' Perception of Telemedicine Services Using the Service User Technology Acceptability Questionnaire.

    Science.gov (United States)

    Dario, Claudio; Luisotto, Elena; Dal Pozzo, Enrico; Mancin, Silvia; Aletras, Vassilis; Newman, Stanton; Gubian, Lorenzo; Saccavini, Claudio

    2016-06-01

    The purpose of this paper is to assess if similar telemedicine services integrated in the management of different chronic diseases are acceptable and well perceived by patients or if there are any negative perceptions. Participants suffering from different chronic diseases were enrolled in Veneto Region and gathered into clusters. Each cluster received a similar telemedicine service equipped with different disease-specific measuring devices. Participants were patients with diabetes (n = 163), chronic obstructive pulmonary disease (n = 180), congestive heart failure (n = 140) and Cardiac Implantable Electronic Devices (n = 1635). The Service User Technology Acceptability Questionnaire (SUTAQ) was initially translated, culturally adapted and pretested and subsequently used to assess patients' perception of telemedicine. Data were collected after 3 months and after 12 months from the beginning of the intervention. Data for patients with implantable devices was collected only at 12 months. Results at 12 months for all clusters are similar and assessed a positive perception of telemedicine. The SUTAQ results for clusters 2 (diabetes), 5 (COPD) and 7 (CHF) after 3 months of intervention were confirmed after 12 months. Telemedicine was perceived as a viable addition to usual care. A positive perception for telemedicine services isn't a transitory effect, but extends over the course of time.

  15. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  16. Strategy for conformity of non-standard cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    CERN as an intergovernmental organization establishes its own Safety Rules as necessary for its proper functioning. In particular, the CERN General Safety Instruction for cryogenic equipment requires that cryogenic pressure equipment at CERN shall comply with the European Pressure Equipment Directive (PED). However, due to the particular features of some of the cryogenic equipment required for the accelerators, as well as the existence of international collaborations with in-kind contributions from non-EU countries, full compliance with the PED may not always be achieved. This situation is foreseen in the Safety Rules, where CERN HSE will define the Safety requirements applicable to such equipment as well as any eventual additional compensatory measure as to ensure a commensurate level of Safety for our pressure equipment. Where compliance with PED may not be achieved, CERN HSE will become the de facto Notified Body and therefore be in charge of the assessment of the conformity of the equipment to the applica...

  17. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  18. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  19. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  20. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations