WorldWideScience

Sample records for accelerator vacuum systems

  1. Vacuum system for Advanced Test Accelerator

    International Nuclear Information System (INIS)

    Denhoy, B.S.

    1981-01-01

    The Advanced Test Accelerator (ATA) is a pulsed linear electron beam accelerator designed to study charged particle beam propagation. ATA is designed to produce a 10,000 amp 50 MeV, 70 ns electron beam. The electron beam acceleration is accomplished in ferrite loaded cells. Each cell is capable of maintaining a 70 ns 250 kV voltage pulse across a 1 inch gap. The electron beam is contained in a 5 inch diameter, 300 foot long tube. Cryopumps turbomolecular pumps, and mechanical pumps are used to maintain a base pressure of 2 x 10 -6 torr in the beam tube. The accelerator will be installed in an underground tunnel. Due to the radiation environment in the tunnel, the controlling and monitoring of the vacuum equipment, pressures and temperatures will be done from the control room through a computer interface. This paper describes the vacuum system design, the type of vacuum pumps specified, the reasons behind the selection of the pumps and the techniques used for computer interfacing

  2. Vacuum system for Advanced Test Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Denhoy, B.S.

    1981-09-03

    The Advanced Test Accelerator (ATA) is a pulsed linear electron beam accelerator designed to study charged particle beam propagation. ATA is designed to produce a 10,000 amp 50 MeV, 70 ns electron beam. The electron beam acceleration is accomplished in ferrite loaded cells. Each cell is capable of maintaining a 70 ns 250 kV voltage pulse across a 1 inch gap. The electron beam is contained in a 5 inch diameter, 300 foot long tube. Cryopumps turbomolecular pumps, and mechanical pumps are used to maintain a base pressure of 2 x 10/sup -6/ torr in the beam tube. The accelerator will be installed in an underground tunnel. Due to the radiation environment in the tunnel, the controlling and monitoring of the vacuum equipment, pressures and temperatures will be done from the control room through a computer interface. This paper describes the vacuum system design, the type of vacuum pumps specified, the reasons behind the selection of the pumps and the techniques used for computer interfacing.

  3. Ultra high vacuum systems for accelerators

    International Nuclear Information System (INIS)

    Loefgren, P.

    2001-01-01

    Full text: In order to perform controlled, stable, and reproducible experiments, several research areas today require very low pressures. Maybe the most important example is the research that is performed in storage rings and accelerators where the lifetime and stability of particle beams depends critically on the vacuum conditions. Although the vacuum requirements ultimately depend on the kind of experiments that is performed, the studies of more and more rare and exotic species in storage rings and accelerators today pushes the demands on the vacuum conditions towards lower and lower pressures. The final pressure obtained in the vacuum system can often be the key factor for the outcome of an experiment. Pioneering work in vacuum technology has therefore often been performed at storage rings and accelerator facilities around the world. In order to reach pressures in the low UHV regime and lower (below 10 -11 mbar), several aspects have to be considered which implies choosing the proper materials, pumps and vacuum gauges. In the absence of gases inleaking from the outside, the rate of gas entering a vacuum system is determined by the release of molecules adsorbed on the surfaces and the outgassing from the bulk of the vacuum chamber walls. This means that the choice of material and, equally important, the pre treatment of the material, must be such that these rates are minimised. Today the most widely used material for vacuum applications are stainless steel. Besides its many mechanical advantages, it is resistant to corrosion and oxidation. If treated correctly the major gas source in a stainless steel chamber is hydrogen outgassing from the chamber walls. The hydrogen outgassing can be decreased by vacuum firing at 950 deg. C under vacuum. In addition to choosing the right materials the choice of vacuum pumps is important for the final pressure. Since no vacuum pump is capable of taking care of all kinds of gases found in the rest gas at pressures below 10 -11

  4. Vacuum system design considerations of the Los Alamos Accelerator Test Stand (ATS)

    International Nuclear Information System (INIS)

    Wilson, N.G.

    1986-01-01

    The accelerator test stand (ATS), in operation at the Los Alamos National Laboratory, includes a hydrogen ion source, low- and high-energy beam-transport sections, and a 425-MHz radio-frequency quadrupole (RFQ) linear accelerator. A 425-MHz drift-tube linac (DTL) and a powered ''buncher'' matching section have been constructed and will be installed on the ATS. The vacuum systems required for the various sections of the ATS are designed to provide: (1) high gas-load capability, as required in the ion source, and (2) high-vacuum capability in the high-power, radio-frequency accelerator sections (where fast vacuum-system response time is of importance) through the use of distributed, differential pumping as a principal vacuum-system feature. This paper describes properties of accelerator materials, vacuum-systems engineering and analysis, vacuum equipment used, and ATS vacuum-system performance

  5. CAS CERN Accelerator School vacuum technology. Proceedings

    International Nuclear Information System (INIS)

    Turner, S.

    1999-01-01

    These proceedings present the lectures given at the twelfth specialized course organized by the CERN Accelerator School (CAS), the topic this time being 'Vacuum Technology'. Despite the importance of vacuum technology in the design and operation of particle accelerators at CERN and at the many other accelerators already installed around the world, this was the first time that CAS has organized a course devoted entirely to this topic. Perhaps this reflects the facts that vacuum has become one of the more critical aspects of future accelerators, and that many of the pioneers in the accelerator field are being replaced by new, younger personnel. The lectures start with the basic concepts of the physics and technology of vacuum followed by detailed descriptions of the many different types of gas-pumping devices and methods to measure the pressures achieved. The outgassing characteristics of the different materials used in the construction of vacuum systems and the optimisation of cleaning methods to reduce this outgassing are then explained together with the effects of the residual gases on the particle beams. Then follow chapters on leak detection, materials and vacuum system engineering. Finally, seminars are presented on designing vacuum systems, the history of vacuum devices, the LHC (large hadron collider) vacuum system, vacuum systems for electron storage rings, and quality assurance for vacuum. (orig.)

  6. Vacuum system of tandem type electrostatic accelerator of Kyushu University

    International Nuclear Information System (INIS)

    Nakajima, Yutaka

    1981-01-01

    In the tandem type electrostatic accelerator of Kyushu University, the problem of vacuum in the beam transport system including the accelerator tube has been considered as one of the important elements for the performance of the electrostatic accelerator from the beginning of construction. Though the three-stage tandem accelerating scheme was considered as the beam transport system at the beginning of the program, in which the existing 6 MV Van de Graaf accelerator was to be used as the injector, three types of ion sources are prepared at present; the sputter ion source to generate negative heavy ions, the polarizing ion source to generate negative polarized protons or deuterons, and direct extraction type negative ion source. Ultrahigh evacuating system, in which the sputter ion pump is mainly employed, and the turbo-molecular pump is used supplementarily, was installed in the vacuum system. The vacuum of approximately 10 - 9 Torr level off-beam at the inlet or outlet of the accelerator tube and approximately 10 - 8 Torr level in the tubing section in the center terminal were achieved. Since the upper limit of withstand voltage of the accelerating tube was not able to be satisfied for the insufficient baking at the beginning, it was finally decided that the accelerating tube should be heated by directly supplying power to the electrode through low voltage discharge in the tube. This method enabled the generated voltage at the terminal to exceed 10 MV. (Wakatsuki, Y.)

  7. The Control System of CERN Accelerators Vacuum (Current Status and Recent Improvements)

    CERN Document Server

    Gomes, P; Blanchard, S; Boccioli, M; Girardot, G; Vestergard, H; Kopylov, L; Mikheev, M

    2011-01-01

    The vacuum control system of most of the CERN accelerators is based on Siemens PLCs and on PVSS SCADA. After the transition from the LHC commissioning phase to its regular operation, there has been a number of additions and improvements to the vacuum control system. They were driven by new technical requirements and by feedback from the accelerator operators and vacuum specialists. New control functions have been implemented in the PLCs; new tools have been developed for the SCADA, while its ergonomics and navigation have been enhanced.

  8. The control system of CERN accelerators vacuum (current status and recent improvements)

    International Nuclear Information System (INIS)

    Gomes, P.; Antoniotti, F.; Blanchard, S.; Boccioli, M.; Girardot, G.; Vestergard, H.; Kopylov, L.; Mikheev, M.

    2012-01-01

    The vacuum control system of most of the CERN accelerators is based on Siemens PLCs and on PVSS SCADA. After the transition from the LHC commissioning phase to its regular operation, there has been a number of additions and improvements to the vacuum control system. They were driven by new technical requirements and by feedback from the accelerator operators and vacuum specialists. New control functions have been implemented in the PLCs; new tools have been developed for the SCADA, while its ergonomic and navigation have been enhanced. (authors)

  9. Ultra high vacuum system of the 3 MeV electron beam accelerator

    International Nuclear Information System (INIS)

    Puthran, G.P.; Jayaprakash, D.; Mishra, R.L.; Ghodke, S.R.; Majumder, R.; Mittal, K.C.; Sethi, R.C.

    2003-01-01

    Full text: A 3 MeV electron beam accelerator is coming up at the electron beam centre, Kharghar, Navi Mumbai. A vacuum of the order of 1x10 -7 mbar is desired in the beam line of the accelerator. The UHV system is spread over a height of 6 meters. The total surface area exposed to vacuum is 65,000 cm 2 and the volume is 200 litres. Distributed pumping is planned, to avoid undesirable vacuum gradient between any two sections of the beam-line. The electron beam is scanned in an area of 6 cms x 100 cms and it comes out of the scan-horn through a titanium foil of 50 micron thick. Hence the vacuum system is designed in such a way that, in the event of foil rupture during beam extraction, the electron gun, accelerating column and the pumps can be protected from sudden air rush. The vacuum in the beam-line can also be maintained in this condition. After changing the foil, scan-horn area can be separately pumped to bring the vacuum level as desired and can be opened to the beam-line. The design, vacuum pumping scheme and the safety aspects are discussed in this paper

  10. Vacuum system of Synchrotron Light National Laboratory (LNLS) linear accelerator: project and results

    International Nuclear Information System (INIS)

    Rocha, L.R.B.; Gomes, P.A.P.

    1990-01-01

    The LINAC, electron linear accelerator used as injector for storage ring in production of synchrotron radiation at Laboratorio Nacional de Luz Sincrotron (LNLS) is described. The LINAC basic parameters, the dimension calculations of vacuum system and the final project with all components are presented. The vacuum system for electron gun tests and accelerator structure tests is described. (M.C.K.)

  11. Accelerator vacuum system elements

    International Nuclear Information System (INIS)

    Sivokon', V.V.; Kobets, A.F.; Shvetsov, V.A.; Sivokon', L.V.

    1980-01-01

    Some elements of vacuum systems are investigated. Considerable attention has been given to the investigation into peculiarities in pumping out of a ionoguide for transportation of an accelerated charged particles beam the spread of which often attains a considerable length. The number of pumps over the ionoguide length is experimentally determined. It is shown that as a result of ionoguide warm-up the pumping out time is considerably reduced maximum permissible pressure is decreased by two orders and lesser rate of pump pumping out is required. The investigations have shown that when operating the ionoguide there is no necessity in setting up seals between the ionoguide and magnetodischarged pump. The causes of the phenomenon in which the pressure near the pump is greater than in the end of the ionoguide, are impurities carried in by the pump into the ionoguide volume and the pumping out capacity of the pressure converter

  12. Accelerator tube vacuum conditions in the NSF tandem

    International Nuclear Information System (INIS)

    Groome, A.E.

    1979-08-01

    The Nuclear Structure Facility currently under construction at the Daresbury Laboratory contains a 30 MV tandem Van de Graaff accelerator with a modular design of accelerator tube. The vacuum system requirements are specified to limit beam loss due to charge-state-changing collisions in the residual gas. This report gives an assessment of some of the parameters affecting the vacuum pressure in an operational machine. Measurements are made of the vacuum conductance and outgassing rate of accelerator tube modules. An assessment is made of the effects of temperature rise, beam mis-steering and the presence of suppression magnets on the ultimate vacuum obtainable. Predictions are made of the pressure profile throughout the machine and consideration is given to operational problems such as tube conditioning and temporary loss of pumping. A schematic diagram of the tandem and its vacuum system is shown. (author)

  13. 2 MeV/20 kW industrial electron beam accelerator vis-s-vis its vacuum system

    International Nuclear Information System (INIS)

    Khader, S.A.; Assadullah, M.; Sarma, K.S.S.; Bandi, L.N.

    2003-01-01

    Full text: Electron beam accelerators in the energy range 200 keV to 10 MeV have been extensively used for many radiation processing applications that include polymerization, polymer modifications, radiation sterilization, food irradiation and gem coloration. The accelerator technology is a multidisciplinary one wherein production of stable vacuum in various accelerator systems is of utmost importance to achieve required output beam parameters like beam energy and current for processing industrial products at large through puts on continuous basis. A 2 MeV, 20 kW industrial electron beam accelerator has been in operation since 2001 at BARC-BRIT complex, Navi Mumbai for commercial and R and D applications like crosslinking of wire and cables, heat shrinkable tubes, PE O rings, PTEE degradation and color enhancement in diamonds. The machine is a ILU-6 type pulse RF accelerator consisting of a single resonator copper cavity of 1.2 m diameter and 1.2 m height (volume:∼ 1.5 m3) placed inside a stainless steel container (called cavity container) and a s.s. beam extraction window wherein vacuum needs to be maintained at a minimum 10-6 torr. Four sputter ion pumps are directly fixed on the cavity container to obtain maximum pumping efficiency. The fore vacuum is generated using a combination rotary and a roots pump. The beam extraction widow has a 50 and 956 m thick titanium foil acting as the exit window for electrons from the vacuum into air. Both the cavity and the beam extraction window are coupled through a gate valve which acts as a vacuum separator isolating the systems from each other during foil puncture, scanning system failure or any other related problems. This paper reports details of the vacuum system, measurements, vacuum leaks and detection and the operational experience related to maintenance and troubleshooting exercises that have been carried in the accelerator

  14. Ultra-high vacuum technology for accelerators

    CERN Multimedia

    CERN. Geneva. Audiovisual Unit; Hilleret, Noël; Strubin, Pierre M

    2002-01-01

    The lectures will start with a review of the basics of vacuum physics required to build Ultra High Vacuum (UHV) systems, such as static and dynamic outgassing. Before reviewing the various pumping and measurement devices, including the most modern one like Non Evaporable Getter (NEG) coatings, an overview of adequate materials to be used in UHV systems will be given together with their treatment (e.g. cleaning procedures and bake out). Practical examples based on existing or future accelerators will be used to illustrate the topics. Finally, a short overview of modern vacuum controls and interlocks will be given.

  15. Proceedings of the international conference on vacuum science and technology and SRS vacuum systems. V.1: accelerators and SRS systems

    International Nuclear Information System (INIS)

    Venkatramani, N.; Sinha, A.K.

    1995-01-01

    An International Conference on Vacuum Science and Technology, INCOVAST-95 was held during January 30 - February 2, 1995 at the Centre for Advanced Technology (CAT), Indore under the aegis of the Indian Vacuum Society. Centre for Advanced Technology has a major programme of design and construction of a 450 MeV electron storage ring, synchrotron radiation source Indus-1 followed by the 1.25 GeV Indus-2. To match the activities at the centre, the present conference had ultrahigh vacuum for Synchrotron Radiation Sources (SRSs) as the main theme. Three major topics, namely accelerators and SRS systems, thin films and surfaces, vacuum components and applications were covered in detail. A short summary of the discussions is also included in the proceedings. Papers relevant to INIS are indexed separately

  16. Simulations and Vacuum Tests of a CLIC Accelerating Structure

    CERN Document Server

    Garion, C

    2011-01-01

    The Compact LInear Collider, under study, is based on room temperature high gradient structures. The vacuum specificities of these cavities are low conductance, large surface areas and a non-baked system. The main issue is to reach UHV conditions (typically 10-7 Pa) in a system where the residual vacuum is driven by water outgassing. A finite element model based on an analogy thermal/vacuum has been built to estimate the vacuum profile in an accelerating structure. Vacuum tests are carried out in a dedicated set-up, the vacuum performances of different configurations are presented and compared with the predictions.

  17. Vacuum Systems Consensus Guideline for Department of Energy Accelerator Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Casey,R.; Haas, E.; Hseuh, H-C.; Kane, S.; Lessard, E.; Sharma, S.; Collins, J.; Toter, W. F.; Olis, D. R.; Pushka, D. R.; Ladd, P.; Jobe, R. K.

    2008-09-09

    and inspections of materials, in-process fabrications, non-destructive tests, and acceptance test. (3) Documentation, traceability, and accountability must be maintained for each unique pressure vessel or system, including descriptions of design, pressure conditions, testing, inspection, operation, repair, and maintenance. The purpose of this guideline is to establish a set of expectations and recommendations which will satisfy the requirements for vacuum vessels in general and particularly when an equivalent level of safety as required by 10 CFR 851 must be provided. It should be noted that these guidelines are not binding on DOE Accelerator Laboratories and that other approaches may be equally acceptable in addressing the Part 851 requirements.

  18. Safety and operational aspects in in-situ electrical baking of large vacuum systems of Indus accelerators

    International Nuclear Information System (INIS)

    Bhatnagar, Prateek; Bhange, Nilesh; Joshi, Sujata; Sridhar, R.

    2016-01-01

    In order to achieve pressures in UHV (Ultra High Vacuum) range, the vacuum chambers and associated vacuum components, necessarily made of UHV compatible materials, should be baked sufficiently long enough so as to reduce outgassing rates. The baking period usually ranges from 48 hours to 72 hours for an electrical load of more than 30 kW per sector, in which baking temperatures, a characteristic parameter and specific to material, range from 150°C-180°C for Aluminium alloy and 250°C-300°C for SS (stainless steel). Indus accelerators vacuum installations include more than 300 m long vacuum chamber which are subjected to rigorous, standardized and labour intensive electrical baking procedure involving an intelligent ON-OFF distributed temperature control system with in-built defence of electrical safety and expandability as per the needs. The paper discusses various in built electrical safely features, operational aspects, work practices and challenges involved in accomplishing an interrupt free continuous electrical baking for distributed electrical load of more than 30 kW for a typical vacuum segment of Indus accelerator. (author)

  19. Vacuum design for the disk-and-washer accelerator structure

    International Nuclear Information System (INIS)

    Ruhe, J.R.; Hansborough, L.D.

    1982-02-01

    The disk-and-washer (DAW) accelerator structure is being developed for several applications. Because of its complicated geometry and newness, vacuum calculations for the DAW accelerator structure are not yet formalized. The applicable vacuum equations for this structure are presented and correlations for it have been made with the vacuum data from the Clinton P. Anderson Meson Physics Facility side-coupled accelerator structure. A calculation is presented for the DAW structure proposed for the Pion Generator for Medical Irradiations (PIGMI) accelerator

  20. Vacuum electron acceleration by coherent dipole radiation

    International Nuclear Information System (INIS)

    Troha, A.L.; Van Meter, J.R.; Landahl, E.C.; Alvis, R.M.; Hartemann, F.V.; Troha, A.L.; Van Meter, J.R.; Landahl, E.C.; Alvis, R.M.; Li, K.; Luhmann, N.C. Jr.; Hartemann, F.V.; Unterberg, Z.A.; Kerman, A.K.

    1999-01-01

    The validity of the concept of laser-driven vacuum acceleration has been questioned, based on an extrapolation of the well-known Lawson-Woodward theorem, which stipulates that plane electromagnetic waves cannot accelerate charged particles in vacuum. To formally demonstrate that electrons can indeed be accelerated in vacuum by focusing or diffracting electromagnetic waves, the interaction between a point charge and coherent dipole radiation is studied in detail. The corresponding four-potential exactly satisfies both Maxwell's equations and the Lorentz gauge condition everywhere, and is analytically tractable. It is found that in the far-field region, where the field distribution closely approximates that of a plane wave, we recover the Lawson-Woodward result, while net acceleration is obtained in the near-field region. The scaling of the energy gain with wave-front curvature and wave amplitude is studied systematically. copyright 1999 The American Physical Society

  1. Cosmological evolution of vacuum and cosmic acceleration

    International Nuclear Information System (INIS)

    Kaya, Ali

    2010-01-01

    It is known that the unregularized expressions for the stress-energy tensor components corresponding to subhorizon and superhorizon vacuum fluctuations of a massless scalar field in a Friedmann-Robertson-Walker background are characterized by the equation of state parameters ω = 1/3 and ω = -1/3, which are not sufficient to produce cosmological acceleration. However, the form of the adiabatically regularized finite stress-energy tensor turns out to be completely different. By using the fact that vacuum subhorizon modes evolve nearly adiabatically and superhorizon modes have ω = -1/3, we approximately determine the regularized stress-energy tensor, whose conservation is utilized to fix the time dependence of the vacuum energy density. We then show that vacuum energy density grows from zero up to H 4 in about one Hubble time, vacuum fluctuations give positive acceleration of the order of H 4 /M 2 p and they can completely alter the cosmic evolution of the universe dominated otherwise by the cosmological constant, radiation or pressureless dust. Although the magnitude of the acceleration is tiny to explain the observed value today, our findings indicate that the cosmological backreaction of vacuum fluctuations must be taken into account in early stages of cosmic evolution.

  2. The Control System of CERN Accelerators Vacuum (LS1 Activities and New Developments)

    CERN Document Server

    Gomes, P; Bellorini, F; Blanchard, S; Boivin, J P; Gama, J; Girardot, G; Pigny, G; Rio, B; Vestergard, H; Kopylov, L; Merker, S; Mikheev, M

    2014-01-01

    After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [1]. Major consolidation and maintenance works are being performed across the whole CERN’s Accelerator chain, in order to prepare the LHC to restart at higher energy, in 2015. The injector chain shall resume earlier, in mid-14. We report about the on-going vacuum-controls projects. Some of them concern the renovation of the controls of certain machines; others are associated with the consolidations of the vacuum systems of LHC and its injectors; and a few are completely new installations. ue to the wide age-span of the existing vacuum installations, there is a mix of design philosophies and of control-equipment generations. The renovations and the novel projects offer an opportunity to improve the uniformity and efficiency of vacuum controls by: reducing the number of equipment versions with similar functionality; identifying, naming, labelling, and documenting all pieces of equipment; homogenizing the contr...

  3. Multistage charged particle accelerator, with high-vacuum insulation

    International Nuclear Information System (INIS)

    Holl, P.

    1976-01-01

    A multistage charged-particle accelerator for operating with accelerating voltages higher than 150 kV is described. The device consists essentially of a high-voltage insulator, a source for producing charged particles, a Wehnelt cylinder, an anode, and a post-accelerating tube containing stack-wise positioned post-accelerating electrodes. A high vacuum is used for insulating the parts carrying the high voltages, and at least one cylindrical screen surrounding these parts is interposed between them and the vacuum vessel, which can itself also function as a cylindrical screen

  4. Ultra-high vacuum photoelectron linear accelerator

    Science.gov (United States)

    Yu, David U.L.; Luo, Yan

    2013-07-16

    An rf linear accelerator for producing an electron beam. The outer wall of the rf cavity of said linear accelerator being perforated to allow gas inside said rf cavity to flow to a pressure chamber surrounding said rf cavity and having means of ultra high vacuum pumping of the cathode of said rf linear accelerator. Said rf linear accelerator is used to accelerate polarized or unpolarized electrons produced by a photocathode, or to accelerate thermally heated electrons produced by a thermionic cathode, or to accelerate rf heated field emission electrons produced by a field emission cathode.

  5. CAS - CERN Accelerator School and ALBA Synchrotron Light Facility : Course on Vacuum in Accelerators

    CERN Document Server

    Vacuum in Accelerators

    2007-01-01

    These proceedings present the lectures given at the twentieth specialized course organized by the CERN Accelerator School (CAS), the topic being Vacuum in Accelerators. The course was held in Platja d’Aro, Spain, from 16 to 24 May 2006. A similar course took place in Snekersten, Denmark, in 1999, with proceedings published as CERN 99-05. After an interval of seven years, the aim of this course was to present a review of the actual state of the art and to highlight the latest developments in the field. The lectures start with a general overview of vacuum, accelerators and cryogenics followed by a more detailed review of the basic principles concerning thermal and non-thermal outgassing. More specialized lectures are then proposed on gas dynamics, on the interaction of energetic particles with matter, and on beam–gas collisions. The production and measurement of vacuum is addressed in subsequent lectures on pumps and vacuum gauges which present a detailed view of the materials currently used in accelerators...

  6. Analytical and numerical tools for vacuum systems

    CERN Document Server

    Kersevan, R

    2007-01-01

    Modern particle accelerators have reached a level of sophistication which require a thorough analysis of all their sub-systems. Among the latter, the vacuum system is often a major contributor to the operating performance of a particle accelerator. The vacuum engineer has nowadays a large choice of computational schemes and tools for the correct analysis, design, and engineering of the vacuum system. This paper is a review of the different type of algorithms and methodologies which have been developed and employed in the field since the birth of vacuum technology. The different level of detail between simple back-of-the-envelope calculations and more complex numerical analysis is discussed by means of comparisons. The domain of applicability of each method is discussed, together with its pros and cons.

  7. Acceleration of charged particles by lasers in vacuum

    International Nuclear Information System (INIS)

    Cicchitelli, L.; Hora, H.; Scheid, W.

    1989-01-01

    For laser acceleration of electrons (and other charged particles) by lasers to the TeV energy range in vacuum, the scheme of trapping electrons in spatially moving and accelerated intensity gradients or minima of laser fields, the single electron motion in standing wave fields is evaluated in details numerically. Acceleration of the minima results in the acceleration of the electrons as expected from global results of the nonlinear forces. If half-wave length laser pulses propagating in vacuum are used the relativistic exact solutions are derived and evaluated. A disadvantage is the lateral motion requiring a large laser focus. For TeV electron energy, MJ KrF-laser pulses are necessary and the acceleration length is about 10 cm. copyright 1989 American Institute of Physics

  8. No survival of Nonlocalilty of fermionic quantum states with alpha vacuum in the infinite acceleration limit

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Younghun, E-mail: yyhkwon@hanyang.ac.kr

    2015-09-02

    In this article, we investigate the nonlocal behavior of the quantum state of fermionic system having the alpha vacuum. We evaluate the maximum violation of CHSH inequality in the quantum state. Even when the maximally entangled quantum state is initially shared it cannot violate the CHSH inequality, regardless of any alpha vacuum, when the infinite acceleration is applied. It means that the nonlocality of the quantum state in fermionic system with the alpha vacuum cannot survive in the infinite acceleration limit.

  9. Design consideration on the synchrotron ultrahigh vacuum system

    International Nuclear Information System (INIS)

    Tsujikawa, H.; Chida, K.; Mizobuchi, A.; Miyahara, A.

    1982-01-01

    Ultrahigh vacuum production for the high-energy heavy-ion accelerator poses special problems concerning beam-gas molecule and beam-wall interactions. In this paper, summary of the TARN ultrahigh vacuum system and design criteria of the synchrotron ultrahigh vacuum system are presented. On-beam pressure of 4 x 10 -11 Torr is achieved in the TARN ultrahigh vacuum system, of which experiences through the construction and the operation are described and discussed. With emphasis on the application of newly developed technique in the fabrication of vacuum chamber and ultrahigh vacuum pump for the synchrotron ultrahigh vacuum system. (author)

  10. Acceleration of plasma into vacuum

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, John [Los Alamos Scientific Laboratory, University of California, Los Alamos, NM (United States)

    1958-07-01

    The first part of this paper is a discussion of the magnetic acceleration of plasma. The second part contains a description of some experiments which have been performed. In the work reported the intention is: 1. To produce a burst of gas in vacuo; 2. To ionize the gas and heat it to such an extent that it becomes a good electrical conductor. 3. To accelerate the plasma thus produced into vacuum by the use of external time-varying magnetic fields.

  11. Technical specification for vacuum systems

    International Nuclear Information System (INIS)

    Khaw, J.

    1987-01-01

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10 -5 to 10 -11 Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing and designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components

  12. Spontaneous excitation of a circularly accelerated atom coupled to electromagnetic vacuum fluctuations

    International Nuclear Information System (INIS)

    Jin, Yao; Hu, Jiawei; Yu, Hongwei

    2014-01-01

    We study, using the formalism proposed by Dalibard, Dupont-Roc and Cohen-Tannoudji, the contributions of the vacuum fluctuation and radiation reaction to the rate of change of the mean atomic energy for a circularly accelerated multilevel atom coupled to vacuum electromagnetic fields in the ultrarelativistic limit. We find that the balance between vacuum fluctuation and radiation reaction is broken, which causes spontaneous excitations of accelerated ground state atoms in vacuum. Unlike for a circularly accelerated atom coupled to vacuum scalar fields, the contribution of radiation reaction is also affected by acceleration, and this term takes the same form as that of a linearly accelerated atom coupled to vacuum electromagnetic fields. For the contribution of vacuum fluctuations, we find that in contrast to the linear acceleration case, terms proportional to the Planckian factor are replaced by those proportional to a non-Planck exponential term, and this indicates that the radiation perceived by a circularly orbiting observer is no longer thermal as is in the linear acceleration case. However, for an ensemble of two-level atoms, an effective temperature can be defined in terms of the atomic transition rates, which is found to be dependent on the transition frequency of the atom. Specifically, we calculate the effective temperature as a function of the transition frequency and find that in contrast to the case of circularly accelerated atoms coupled to the scalar field, the effective temperature in the current case is always larger than the Unruh temperature. -- Highlights: •We study the spontaneous excitation of a circularly accelerated atom. •Contribution of radiation reaction to the excitation is affected by acceleration. •The radiation perceived by a circularly orbiting observer is no longer thermal. •An effective temperature can be defined in terms of atomic transition rates. •Effective temperature is larger than Unruh temperature and frequency-dependent

  13. Linear accelerator section alignment in a vacuum chamber

    International Nuclear Information System (INIS)

    Vengrov, R.M.; Vinogradskij, N.N.; Danil'tsev, E.N.; Iosseliani, D.D.; Kosyak, V.S.; Porubaj, N.I.; Ugarov, S.B.

    1989-01-01

    Alignment technique for multisectional accelerating structures, that may be used in designing new accelerators for experimental and applied purposes, is described. The accuracy of the alignment of four-chamber resonator sections directly in an accelerator vacuum volume without its depressurization is not less than 100 μm. 8 refs.; 5 figs.; 5 tabs

  14. The AGS Booster vacuum systems

    International Nuclear Information System (INIS)

    Hseuh, H.C.

    1989-01-01

    The AGS Booster is a synchrotron for the acceleration of both protons and heavy ions. The design pressure of low 10 -11 mbar is required to minimize beam loss of the partially stripped heavy ions. To remove contaminants and to reduce outgassing, the vacuum chambers and the components located in them will be chemically cleaned, vacuum fired, baked then treated with nitric oxide. The vacuum sector will be insitu baked to a minimum of 200 degree C and pumped by the combination of sputter ion pumps and titanium sublimation pumps. This paper describes the design and the processing of this ultra high vacuum system, and the performance of some half-cell vacuum chambers. 9 refs., 7 figs

  15. Method of correcting eddy current magnetic fields in particle accelerator vacuum chambers

    Science.gov (United States)

    Danby, Gordon T.; Jackson, John W.

    1991-01-01

    A method for correcting magnetic field aberrations produced by eddy currents induced in a particle accelerator vacuum chamber housing is provided wherein correction windings are attached to selected positions on the housing and the windings are energized by transformer action from secondary coils, which coils are inductively coupled to the poles of electro-magnets that are powered to confine the charged particle beam within a desired orbit as the charged particles are accelerated through the vacuum chamber by a particle-driving rf field. The power inductively coupled to the secondary coils varies as a function of variations in the power supplied by the particle-accelerating rf field to a beam of particles accelerated through the vacuum chamber, so the current in the energized correction coils is effective to cancel eddy current flux fields that would otherwise be induced in the vacuum chamber by power variations in the particle beam.

  16. The vacuum system for technological unit development and design

    Science.gov (United States)

    Zhukeshov, A. M.; Gabdullina, A. T.; Amrenova, A. U.; Giniyatova, Sh G.; Kaibar, A.; Sundetov, A.; Fermakhan, K.

    2015-11-01

    The paper shows results of development of plasma technological unit on the basis of accelerator of vacuum arc and automated system. During the previous years, the authors investigated the operation of pulsed plasma accelerator and developed unique technologies for hardening of materials. Principles of plasma formation in pulsed plasma accelerator were put into basis of the developed unit. Operation of the pulsed arc accelerator was investigated at different parameters of the charge. The developed vacuum system is designed for production of hi-tech plasma units in high technologies in fields of nanomaterials, mechanical and power engineering and production with high added value. Unlike integrated solutions, the system is a module one to allow its low cost, high reliability and simple maintenance. The problems of use of robots are discussed to modernize the technological process.

  17. The vacuum system for technological unit development and design

    International Nuclear Information System (INIS)

    Zhukeshov, A M; Gabdullina, A T; Amrenova, A U; Giniyatova, Sh G; Kaibar, A; Sundetov, A; Fermakhan, K

    2015-01-01

    The paper shows results of development of plasma technological unit on the basis of accelerator of vacuum arc and automated system. During the previous years, the authors investigated the operation of pulsed plasma accelerator and developed unique technologies for hardening of materials. Principles of plasma formation in pulsed plasma accelerator were put into basis of the developed unit. Operation of the pulsed arc accelerator was investigated at different parameters of the charge. The developed vacuum system is designed for production of hi-tech plasma units in high technologies in fields of nanomaterials, mechanical and power engineering and production with high added value. Unlike integrated solutions, the system is a module one to allow its low cost, high reliability and simple maintenance. The problems of use of robots are discussed to modernize the technological process. (paper)

  18. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  19. Developments on the SCADA of CERN Accelerators Vacuum

    CERN Document Server

    Antoniotti, F; Boccioli, M; Gomes, P; Pereira, H; Kopylov, L; Mikheev, M; Merker, S

    2014-01-01

    During the first 3 years of LHC operation, the priority for the SCADA (Supervisory Control And Data Acquisition) of vacuum controls was to attend to user requests, and to improve its ergonomics and efficiency: access & presentation of information simplified and normalized; coherent functionalities & menus across all accelerators; automatic scripts instead of fastidious manual actions; enhanced tools for data analysis and for maintenance interventions. Several decades of cumulative developments, based on heterogeneous technologies and architectures, have been asking for a homogenization effort. The first LHC Long Shutdown (LS1) provides the opportunity to further standardize the vacuum controls systems [1], around Siemens-S7 PLCs (Programmable Logic Controllers) and PVSS SCADA. Meanwhile, exchanges with other Groups at CERN and outside Institutes have been promoted: to follow the global update policy for software libraries; to discuss philosophies and development details; and to accomplish common pro...

  20. Operating status of TARN vacuum system and future tasks

    International Nuclear Information System (INIS)

    Chida, Katsuhisa; Tsujikawa, Hiroshi; Mizobuchi, Akira

    1981-01-01

    TARN (Test Accumulation Ring for Numatron) was constructed for the purpose of obtaining the fundamental data for high energy heavy ion accelerator (Numatron) project, which accelerates heavy ions up to uranium to 1 GeV/nucleon. Its vacuum is required to be 1 x 10 - 10 Torr or less on beam. In February, 1972, only the vacuum system was temporarily assembled, and the vacuum of 2 x 10 - 11 Torr was realized by baking at 300 deg C alone. In July, 1972, the assembling of the vacuum chamber into magnets was completed, and several test experiments were performed using the H 2+ beam from the SF cyclotron. In this report, first, the outline of the vacuum system, and next, its operation are described. For the reason of the purpose of the ring, the vacuum system is required to be atmospheric pressure to attach beam monitors and other measuring instruments just before the machine time. Therefore, it is an important task to make the evacuation time as short as possible. As future tasks, the examination on the material and shape of the chamber, the investigation of pump system (appropriate combination of ion pump, titanium sublimation pump, cryo-pump, molecular pump, etc.), the study on the measuring and control systems (accurate measurement of total pressure and partial pressure and the feedback to the protecting system), the studies of problems on the vacuum wall surface (surface treatment prior to assembling the chamber into the ring and the methods and the effects of baking and electric discharge cleaning) are included. (Wakatsuki, Y.)

  1. Calculation and optimization of laser acceleration in vacuum

    Directory of Open Access Journals (Sweden)

    Z. Huang

    2004-01-01

    Full Text Available Extraordinarily high fields generated by focused lasers are envisioned to accelerate particles to high energies. In this paper, we develop a new method to calculate laser acceleration in vacuum based on the energy exchange arising from the interference of the laser field with the radiation field of the particle. We apply this method to a simple accelerating structure, a perfectly conducting screen with a round hole, and show how to optimize the energy gain with respect to the hole radius, laser angle, and spot size, as well as the transverse profile of the laser. Limitations and energy scaling of this acceleration method are also discussed.

  2. Fast response system for vacuum volume emergency separation

    International Nuclear Information System (INIS)

    Gubrienko, K.I.; Lastochkin, Yu.A.

    1982-01-01

    A system which allows to separate vacuum systems of the magnetic-optic beam channels connected with the accelerator has been worked out for case of emergency environment break through the extraction ''window''. The system, consisting of two valve - gate devices and a control unit, allows one in the emergency case to separate more than 20 m long volume from the accelerator without any pressure changes in the latter one

  3. Proceedings of the 5th meeting on ultra high vacuum techniques for accelerators and storage rings

    International Nuclear Information System (INIS)

    Horikoshi, Gen-ichi

    1984-08-01

    This is the proceedings of the 5th meeting on UHV Techniques for Accelerators and Storage Rings held at KEK, March 26-27, 1984. More than 110 vacuum scientists attended the meeting, and 23 reports were presented. Main subjects were, of course, concerning with the vacuum systems for large accelerators and plasma devices under planning or construction in Japan. At the same time, many reports on the general problems of vacumm science were also presented. The subjects of these reports were outgassing phenomenon, surface problems, new type UHV pumps and others. (author)

  4. Laser vacuum acceleration of a relativistic electron bunch

    Energy Technology Data Exchange (ETDEWEB)

    Glazyrin, I V; Karpeev, A V; Kotova, O G; Nazarov, K S [E.I. Zababakhin All-Russian Scientific-Research Institute of Technical Physics, Russian Federal Nuclear Centre, Snezhinsk, Chelyabinsk region (Russian Federation); Bychenkov, V Yu [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation)

    2015-06-30

    With regard to the problem of laser acceleration of a relativistic electron bunch we present a scheme of its vacuum acceleration directly by a relativistic intensity laser pulse. The energy of the electron bunch injected into the laser pulse leading edge increases during its coaxial movement to a thin, pulse-reflecting target. The laser-accelerated electrons continue to move free forward, passing through the target. The study of this acceleration scheme in the three-dimensional geometry is verified in a numerical simulation by the particle-in-cell method, which showed that the energy of a part of the electrons can increase significantly compared to the initial one. Restrictions are discussed, which impose limiting values of energy and total charge of accelerated electrons. (superstrong light fields)

  5. The HIE-ISOLDE Vacuum System

    CERN Document Server

    Vandoni, G; Radwan, K; Chiggiato, P

    2014-01-01

    The High Intensity and Energy Isolde (HIE-Isolde) project aims at increasing the energy and intensity of the radioactive ion beams (RIB) delivered by the present Rex-Isolde facility. Energy up to 10MeV/amu will be reached by a new post-accelerating, superconducting (SC) linac. Beam will be delivered via a HEBT to three experimental stations for nuclear physics. To keep the SC linac compact and avoid cold-warm transitions, the cryomodules feature a common beam and insulation vacuum. Radioactive ion beams require a hermetically sealed vacuum, with transfer of the effluents to the nuclear ventilation chimney. Hermetically sealed, dry, gas transfer vacuum pumps are preferred to gas binding pumps, for an optimized management of radioactive contamination risk during maintenance and intervention. The vacuum system of the SC-linac is isolated by two fast valves, triggered by fast reacting cold cathode gauges installed on the warm linac, the HEBT and the experimental stations. Rough pumping is distributed, while the H...

  6. Dynamic Model for the Z Accelerator Vacuum Section Based on Transmission Line Code%Dynamic Model for the Z Accelerator Vacuum Section Based on Transmission Line Code

    Institute of Scientific and Technical Information of China (English)

    呼义翔; 雷天时; 吴撼宇; 郭宁; 韩娟娟; 邱爱慈; 王亮平; 黄涛; 丛培天; 张信军; 李岩; 曾正中; 孙铁平

    2011-01-01

    The transmission-line-circuit model of the Z accelerator, developed originally by W. A. STYGAR, P. A. CORCORAN, et al., is revised. The revised model uses different calculations for the electron loss and flow impedance in the magnetically insulated transmission line system of the Z accelerator before and after magnetic insulation is established. By including electron pressure and zero electric field at the cathode, a closed set of equations is obtained at each time step, and dynamic shunt resistance (used to represent any electron loss to the anode) and flow impedance are solved, which have been incorporated into the transmission line code for simulations of the vacuum section in the Z accelerator. Finally, the results are discussed in comparison with earlier findings to show the effectiveness and limitations of the model.

  7. The CAS and ALBA Synchrotron Light Facility specialized school on 'Vacuum in Accelerators' members in Platja d'Aro, Spain - 16-24 May, 2006.

    CERN Multimedia

    2006-01-01

    This course is aimed at providing a detailed overview of the topics relevant for the design and operation of accelerator vacuum systems. The lectures will be given by teachers whose expertise is internationally recognised. Specialists from the vacuum industry will also give lectures in the field where their expertise is unique. The topics selected comprise general vacuum questions: e.g. outgassing, gas dynamics, stimulated desorption as well as more practical subjects: gauges, mechanical pumps, getter pumps, sealing technology, or important subjects for the running of accelerators: large systems commissioning, beam-vacuum interactions, control systems. The course will also encourage contacts and informal discussions between participants, teachers and representatives of the vacuum industry as the majority of teachers will be present during the complete duration of the course.

  8. Vacuum arc localization in CLIC prototype radio frequency accelerating structures

    CERN Document Server

    AUTHOR|(CDS)2091976; Koivunen, Visa

    2016-04-04

    A future linear collider capable of reaching TeV collision energies should support accelerating gradients beyond 100 MV/m. At such high fields, the occurrence of vacuum arcs have to be mitigated through conditioning, during which an accelerating structure’s resilience against breakdowns is slowly increased through repeated radio frequency pulsing. Conditioning is very time and resource consuming, which is why developing more efficient procedures is desirable. At CERN, conditioning related research is conducted at the CLIC high-power X-band test stands. Breakdown localization is an important diagnostic tool of accelerating structure tests. Abnormal position distributions highlight issues in structure design, manufacturing or operation and may consequently help improve these processes. Additionally, positioning can provide insight into the physics of vacuum arcs. In this work, two established positioning methods based on the time-difference-ofarrival of radio frequency waves are extended. The first method i...

  9. Vacuum system of the compact Energy Recovery Linac

    Energy Technology Data Exchange (ETDEWEB)

    Honda, T., E-mail: tohru.honda@kek.jp; Tanimoto, Y.; Nogami, T.; Takai, R.; Obina, T.; Asaoka, S.; Uchiyama, T.; Nakamura, N. [High Energy Accelerator Research Organization (KEK) (1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan) (Japan)

    2016-07-27

    The compact Energy Recovery Linac (cERL), a test accelerator to establish important technologies demanded for future ERL-based light sources, was constructed in late 2013 at KEK. The accelerator was successfully commissioned in early 2014, and demonstrated beam circulation with energy recovery. In the cERL vacuum system, low-impedance vacuum components are required to circulate high-intensity, low-emittance and short-bunch electron beams. We therefore developed ultra-high-vacuum (UHV)-compatible flanges that can connect beam tubes seamlessly, and employed retractable beam monitors, namely, a movable Faraday cup and screen monitors. In most parts of the accelerator, pressures below 1×10{sup −7} Pa are required to mitigate beam-gas interactions. Particularly, near the photocathode electron gun and the superconducting (SC) cavities, pressures below 1×10{sup −8} Pa are required. The beam tubes in the sections adjoining the SC cavities were coated with non-evaporable getter (NEG) materials, to reduce gas condensation on the cryo-surfaces. During the accelerator commissioning, stray magnetic fields from the permanent magnets of some cold cathode gauges (CCGs) were identified as a source of the disturbance to the beam orbit. Magnetic shielding was specially designed as a remedy for this issue.

  10. Troubles in vacuum system and radiation exposure

    International Nuclear Information System (INIS)

    Konno, Osamu

    1978-01-01

    It is about eleven years since the LINAC of 300 MeV in Tohoku University has first accelerated electrons. The maintenance and improvement of the accelerator used more than 10 years now give the related personnel an important problem of radiation exposure. 40 days were required for the maintenance and checking-up in 1977, and other 26 days were used for other construction works. The troubles in the vacuum system occurred 81 times in total. The vacuum system is divided into two subsystems, each being provided with a leak detector. Either of them enables to detect and locate the leak. Silver-alloy brazing of a duct with a cooling water tube has deteriorated in the strength because of repeated baking temperature and/or the copper tubes for cooling have been eroded due to the large local cell action by purified water. The similar phenomena have occurred in RF windows, outside of which is cooled with water. Carbonaceous matter has stuck to the element of the ion pump, but successfully been cleaned. Though the energy compression system was installed for the efficient use of electrons, the troubles due to overheating of the current monitor have increased because of its limited space, and the change of location was made. Considerable surface residual radiation dose was found at some parts of transport system, and a few personnel have been exposed to radiation over 1000 mrem/year as a result of the troubles in vacuum system. (Wakatsuki, Y.)

  11. Evaluation of CBA first string full cell vacuum system

    International Nuclear Information System (INIS)

    Foerster, C.L.; Briggs, J.; Christianson, C.; Stattel, P.

    1983-01-01

    The CBA (Colliding Beam Accelerator, formerly known as ISABELLE) Full Cell Magnet System consisting of six superconducting dipole magnets and two superconducting quadrupole magnets requires two separate vacuum systems. One, known as beam vacuum operates below 3 x 10 -11 Torr and the other, known as insulating vacuum, operates at less than 10 -7 Torr to isolate cryo circuits from atmosphere and from the uhv beam tubes. The uhv bore tube is isolated from the 4.0 0 K magnet by thirty-six (36) layers of superinsulation and insulating vacuum. Heat load measurements on the bore tube have been completed and found to agree with data obtained in smaller controlled experiments. Measurements of helium, accumulated on cryogenic pumped charcoal panels over many weeks, have verified sensitive helium mass spectrometer leak detection methods for vacuum integrity, providing sound design of the welded complex. The Full Cell was assembled and operated under conditions that would exist in the completed machine. Pressures below 2 x 10 -11 Torr beam vacuum requirement and below 2 x 10 -7 Torr insulating vacuum, were routinely achieved during all phases of the Full Cell operation and support systems testing

  12. MEA vacuum system

    International Nuclear Information System (INIS)

    Stroo, R.; Schwebke, H.; Heine, E.

    1984-01-01

    This report describes construction and operation of the MEA vacuum system of NIKHEF (Netherlands). First, the klystron vacuum system, beam transport system, diode pump and a triode pump are described. Next, the isolation valve and the fast valves of the vacuum system are considered. Measuring instruments, vacuum system commands and messages of failures are treated in the last chapter. (G.J.P.)

  13. Pressure measurements in the AGS Booster ultra-high vacuum system

    International Nuclear Information System (INIS)

    Gabusi, J.; Geller, J.; Hseuh, H.C.; Mapes, M.; Stattel, P.

    1992-01-01

    An average pressure of mid 10 -11 Torr has been achieved and maintained in the AGS Booster ring vacuum system during its first year of operation. This ultra-high vacuum system is monitored through remote controlled Bayard-Alpert Gauges (BAGs). The characteristics of the pressure measurements with BAGs over the long cable lengths (up to 200 m) and under various accelerator operating conditions will be described. Two types of noise in the pressure readouts have been identified; the electromagnetic interference (EMI) associated with the acceleration cycles of the Booster and the environment noise associated with the temperature of the collector cables. The magnitude of the noise pickup depends on the routing of the collector cables and reaches the equivalent pressure of low 10 -9 Torr

  14. LHC : The World's Largest Vacuum Systems being commissioned at CERN

    CERN Document Server

    Jiménez, J M

    2008-01-01

    When it switches on in 2008, the 26.7 km Large Hadron Collider (LHC) at CERN, will have the world's largest vacuum system operating over a wide range of pressures and employing an impressive array of vacuum technologies. This system is composed by 54 km of UHV vacuum for the circulating beams and 50 km of insulation vacuum around the cryogenic magnets and the liquid helium transfer lines. Over the 54 km of UHV beam vacuum, 48 km of this are at cryogenic temperature (1.9 K). The remaining 6 km of beam vacuum containing the insertions for "cleaning" the proton beams, radiofrequency cavities for accelerating the protons as well as beam-monitoring equipment is at ambient temperature and uses non-evaporable getter (NEG) coatings - a vacuum technology that was born and industrialized at CERN. The pumping scheme is completed using 780 ion pumps to remove noble gases and to provide pressure interlocks to the 303 vacuum safety valves. Pressure readings are provided by 170 Bayard-Alpert gauges and 1084 gauges (Pirani a...

  15. Vacuum laser acceleration using a radially polarized CO sub 2 laser beam

    CERN Document Server

    Liu, Y; He, P

    1999-01-01

    Utilizing the high-power, radially polarized CO sub 2 laser and high-quality electron beam at the Brookhaven Accelerator Test Facility, a vacuum laser acceleration scheme is proposed. In this scheme, optics configuration is simple, a small focused beam spot size can be easily maintained, and optical damage becomes less important. At least 0.5 GeV/m acceleration gradient is achievable by 1 TW laser power.

  16. The chirped-pulse inverse free-electron laser: A high-gradient vacuum laser accelerator

    International Nuclear Information System (INIS)

    Hartemann, F.V.; Landahl, E.C.; Troha, A.L.; Van Meter, J.R.; Baldis, H.A.; Freeman, R.R.; Luhmann, N.C. Jr.; Song, L.; Kerman, A.K.; Yu, D.U.

    1999-01-01

    The inverse free-electron laser (IFEL) interaction is studied theoretically and computationally in the case where the drive laser intensity approaches the relativistic regime, and the pulse duration is only a few optical cycles long. The IFEL concept has been demonstrated as a viable vacuum laser acceleration process; it is shown here that by using an ultrashort, ultrahigh-intensity drive laser pulse, the IFEL interaction bandwidth and accelerating gradient are increased considerably, thus yielding large energy gains. Using a chirped pulse and negative dispersion focusing optics allows one to take further advantage of the laser optical bandwidth and produce a chromatic line focus maximizing the gradient. The combination of these novel ideas results in a compact vacuum laser accelerator capable of accelerating picosecond electron bunches with a high gradient (GeV/m) and very low energy spread. copyright 1999 American Institute of Physics

  17. Laser acceleration in vacuum with an open iris-loaded waveguide

    International Nuclear Information System (INIS)

    Xie, Ming

    1997-05-01

    An open iris-loaded waveguide structure is considered for laser acceleration of highly relativistic particle in vacuum. Complete characterization of all eigenmodes are given in analytical form for the structure. In particular the dominant radially polarized TM mode is evaluated in detail for laser acceleration. The entire parameter space is searched and it is found that below the laser damage threshold of the structure an acceleration gradient around 1 GV/m can be obtained over a phase slippage length of 10s of cm with TWs laser in the wavelength range from 1 to 10 μm

  18. Vacuum considerations summary

    International Nuclear Information System (INIS)

    1977-01-01

    The vacuum system for Heavy Ion Fusion machines can be divided according to pressure into 4 parts: (a) Ion Sources; (b) Linear Accelerators; (c) Circular Accelerators, Accumulators and Storage Rings; and (d) Reactors. Since ion sources will need rather conventional pumping arrangements and reactors will operate with greater pressures, depending on their mode of operation, only items b and c will be treated in this report. In particular, the vacuum system design will be suggested for the machines proposed by various scenarios arrived at during the workshop. High mass numbers will be assumed

  19. The Plasma Window: A Windowless High Pressure-Vacuum Interface for Various Accelerator Applications

    International Nuclear Information System (INIS)

    Hershcovitch, A. I.; Johnson, E. D.; Lanza, R. C.

    1999-01-01

    The Plasma Window is a stabilized plasma arc used as an interface between accelerator vacuum and pressurized targets. There is no solid material introduced into the beam and thus it is also capable of transmitting particle beams and electromagnetic radiation with low loss and of sustaining high beam currents without damage. Measurements on a prototype system with a 3 mm diameter opening have shown that pressure differences of more than 2.5 atmospheres can be sustained with an input pressure of ∼ 10 -6 Torr. The system is capable of scaling to higher-pressure differences and larger apertures. Various plasma window applications for synchrotron light sources, high power lasers, internal targets, high current accelerators such as the HAWK, ATW, APT, DARHT, spallation sources, as well as for a number of commercial applications, is discussed

  20. Hardwired interlock system with fault latchability and annunciation panel for electron accelerators

    International Nuclear Information System (INIS)

    Mukesh Kumar; Roychoudhury, P.; Nimje, V.T.

    2011-01-01

    A hard-wired interlock system is designed, developed, installed and tested to ensure healthy status for interlock signals, coming from the various sub-systems of electron accelerators as digital inputs. Each electron accelerator has approximately ninety-six interlock signals. Hardwired Interlock system consists of twelve-channel 19 inches rack mountable hard-wired interlock module of 4U height. Digital inputs are fed to the hard-wired interlock module in the form of 24V dc for logic 'TRUE' and 0V for logic 'FALSE'. These signals are flow signals to ensure cooling of the various sub-systems, signals from the klystron modulator system in RF Linac to ensure its healthy state to start, signals from high voltage system of DC accelerator, vacuum signals from vacuum system to ensure proper vacuum in the electron accelerator, door interlock signals, air flow signals, and area search and secure signals. This hard-wired interlock system ensures the safe start-up, fault annunciation and alarm, fault latchablity, and fail-safe operation of the electron accelerators. Safe start-up feature ensures that beam generation system can be made ON only when cooling of all the electron accelerator sub-systems are confirmed, all the fault signals of high voltage generation system are attended, proper vacuum is achieved inside the beam transport system, all the doors are closed and various areas have been searched and secured manually. Fault annunciation and alarm feature ensures that during the start up and operation of the electron accelerators, if any fault is there, that fault signal window keeps on flashing with red colour and alarm is sounded till the operator acknowledges the fault. Once acknowledged, flashing and alarm stops but display of the window in red colour remains till the operator clears the fault. Fault latchability feature ensures that if any fault has happened, accelerator cannot be started again till the operator resets that interlock signal. Fail-safe feature ensures

  1. Measurements of x-ray scattering from accelerator vacuum chamber surfaces, and comparison with an analytical model

    Directory of Open Access Journals (Sweden)

    G. F. Dugan

    2015-04-01

    Full Text Available This paper compares measurements and calculations of scattering of photons from technical vacuum chamber surfaces typical of accelerators. Synchrotron radiation generated by a charged particle beam in the accelerator is either absorbed, specularly reflected, or scattered by the vacuum chamber surface. This phenomenon has important implications on the operation of the accelerator. Measurements of photon scattering were made at the BESSY-II synchrotron radiation facility using samples of aluminum vacuum chamber from Cornell electron storage ring (CESR. A description of the analytic model used in the calculation is given, which takes into account the reflectivity of the material, the surface features of the sample, the wavelengths and the incident angles of the photons. The surface properties used in these calculations were obtained from measurements made from an atomic force microscope.

  2. Accelerator system model (ASM): A unique tool in exploring accelerator driven transmutation technologies (ADTT) system trade space

    Energy Technology Data Exchange (ETDEWEB)

    Myers, T.J.; Favale, A.J.; Berwald, D.H.; Burger, E.C.; Paulson, C.C.; Peacock, M.A.; Piaszczyk, C.M.; Piechowiak, E.M.; Rathke, J.W. [Northrop Grumman Corp., Bethpage, NY (United States). Advanced Technology and Development Center

    1997-09-01

    To aid in the development and optimization of emerging Accelerator Driven Transmutation Technology (ADTT) concepts, the Northrop Grumman Corporation, working together with G.H. Gillespie Associates and Los Alamos National Laboratory has developed a computational tool which combines both accelerator physics layout/analysis capabilities with engineering analysis capabilities to create a standardized platform to compare and contrast accelerator system configurations. In this context, the accelerator system configuration includes not only the accelerating structures, but also the major support systems such as the vacuum, thermal control, RF power, and cryogenic subsystem (if superconducting accelerator operation is investigated) as well as estimates of the costs for enclosures (accelerating tunnel and RF halls). This paper presents an overview of the Accelerator System Model (ASM) code flow, as well as a discussion of the data and analysis upon which it is based. Also presented is material which addresses the development of the evaluation criteria employed by this code including a presentation of the economic analysis methods, and a discussion of the cost database employed. The paper concludes with examples depicting completed and planned trade studies for both normal and superconducting accelerator applications. 8 figs.

  3. Vacuum system for ISABELLE

    International Nuclear Information System (INIS)

    Hobson, J.P.

    1975-01-01

    An analysis is presented of the proposed vacuum system for the planned ISABELLE storage rings with respect to acceptability and practicality from the vacuum viewport. A comparison is made between the proposed vacuum system and the vacuum system at the CERN ISR, and some comments on various design and operational parameters are made

  4. CERN Accelerator School: A vacuum well filled

    CERN Multimedia

    2006-01-01

    CAS and the ALBA Synchrotron Light Facility (Consortium CELLS) jointly organized a specialized school on 'Vacuum in Accelerators' in Platja d'Aro, Spain from 16 to 24 May, 2006. The last CAS course dedicated to the vacuum was organized in 1999, so there was plenty of ground to cover. The challenging programme proposed a review of the latest state of the art developments in the field and included 36 hours of course work. A one-day excursion to Barcelona was also part of the programme. A record of 93 students of more than 24 nationalities attended the course, not only from Europe and North America, but also from Brazil, China, India, Jordan, Morocco and Taiwan. European industry showed a welcome and solid interest in the school both by sending participants to the course, and by providing a few scholarships for highly deserving young students, who would not otherwise have been able to participate without this support. Feedback from the participants acknowledged the expertise of the lecturers, as well as the ...

  5. Accelerated Biofluid Filling in Complex Microfluidic Networks by Vacuum-Pressure Accelerated Movement (V-PAM).

    Science.gov (United States)

    Yu, Zeta Tak For; Cheung, Mei Ki; Liu, Shirley Xiaosu; Fu, Jianping

    2016-09-01

    Rapid fluid transport and exchange are critical operations involved in many microfluidic applications. However, conventional mechanisms used for driving fluid transport in microfluidics, such as micropumping and high pressure, can be inaccurate and difficult for implementation for integrated microfluidics containing control components and closed compartments. Here, a technology has been developed termed Vacuum-Pressure Accelerated Movement (V-PAM) capable of significantly enhancing biofluid transport in complex microfluidic environments containing dead-end channels and closed chambers. Operation of the V-PAM entails a pressurized fluid loading into microfluidic channels where gas confined inside can rapidly be dissipated through permeation through a thin, gas-permeable membrane sandwiched between microfluidic channels and a network of vacuum channels. Effects of different structural and operational parameters of the V-PAM for promoting fluid filling in microfluidic environments have been studied systematically. This work further demonstrates the applicability of V-PAM for rapid filling of temperature-sensitive hydrogels and unprocessed whole blood into complex irregular microfluidic networks such as microfluidic leaf venation patterns and blood circulatory systems. Together, the V-PAM technology provides a promising generic microfluidic tool for advanced fluid control and transport in integrated microfluidics for different microfluidic diagnosis, organs-on-chips, and biomimetic studies. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  6. Cold Vacuum Drying (CVD) Facility Vacuum Purge System Chilled Water System Design Description. System 47-4

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    2000-01-01

    This system design description (SDD) addresses the Vacuum Purge System Chilled Water (VPSCHW) system. The discussion that follows is limited to the VPSCHW system and its interfaces with associated systems. The reader's attention is directed to Drawings H-1-82162, Cold Vacuum Drying Facility Process Equipment Skid PandID Vacuum System, and H-1-82224, Cold Vacuum Drying Facility Mechanical Utilities Process Chilled Water PandID. Figure 1-1 shows the location and equipment arrangement for the VPSCHW system. The VPSCHW system provides chilled water to the Vacuum Purge System (VPS). The chilled water provides the ability to condense water from the multi-canister overpack (MCO) outlet gases during the MCO vacuum and purge cycles. By condensing water from the MCO purge gas, the VPS can assist in drying the contents of the MCO

  7. Ultra high vacuum activities and required modification at 14 UD BARC-TIFR pelletron accelerator facility

    International Nuclear Information System (INIS)

    Sharma, S.C.; Ninawe, N.G.; Ramjilal; Bhagwat, P.V.; Salvi, S.B.

    2003-01-01

    Full text: The 14 UD pelletron accelerator is working round the clock since 1989. The accelerator is housed inside a tank which is 6 meter in diameter and 25 meter long. The accelerator tank is pressurized with SF 6 at 80 to 100 PSIG in order to achieve 14MV. In pelletron, ions are extracted from SNICS are pre-accelerated up to 300 keV before being injected into low energy accelerator tube. In the terminal which is at high potential (4MV to 14 MV), the ion beam pass through the stripper and positive ions with high charge states are produced. The high energy beams are focussed and analyzed by 90 deg magnet. The analyzed beam is then transported to the various experimental ports. In order to achieve uniform ultra high vacuum (to reduce the loss of intensity and spread in the energy of ions beams) in more than 100 metre and 100 mm diameter beam lines including magnet chambers and various beam diagnostic devices, combination of getter-ion pumps and turbo pumps are being used at Pelletron Accelerator Facility. The 14 UD pelletron is equipped with a combination of foil and gas stripper in high voltage terminal section. The foil and gas stripper in the terminal section are mainly used for stripping of light and heavy ions respectively. The gas stripper plays a great role for stripping of heavy ions and its efficiency depends on gas stripper parameters and supporting pumps. The gas stripper is originally installed with getter pumps. These pumps required periodic replacement of titanium cartridges and slowly the pumping speed used to diminish with time. A new recirculation turbo molecular pumps based system is being designed to improve good beam transmission. Details of design will be presented. Proton beam of tens of MeV energy and μA range current is in demand to carry out specific radiochemistry experiments in this facility. It is proposed to built and accommodate a proton experimental setup in the tower area of the existing facility. Details of required UHV system for

  8. Monte Carlo simulations of ultra high vacuum and synchrotron radiation for particle accelerators

    CERN Document Server

    AUTHOR|(CDS)2082330; Leonid, Rivkin

    With preparation of Hi-Lumi LHC fully underway, and the FCC machines under study, accelerators will reach unprecedented energies and along with it very large amount of synchrotron radiation (SR). This will desorb photoelectrons and molecules from accelerator walls, which contribute to electron cloud buildup and increase the residual pressure - both effects reducing the beam lifetime. In current accelerators these two effects are among the principal limiting factors, therefore precise calculation of synchrotron radiation and pressure properties are very important, desirably in the early design phase. This PhD project shows the modernization and a major upgrade of two codes, Molflow and Synrad, originally written by R. Kersevan in the 1990s, which are based on the test-particle Monte Carlo method and allow ultra-high vacuum and synchrotron radiation calculations. The new versions contain new physics, and are built as an all-in-one package - available to the public. Existing vacuum calculation methods are overvi...

  9. Vacuum system for LHC

    International Nuclear Information System (INIS)

    Groebner, O.

    1995-01-01

    The Large Hadron Collider (LHC) which is planned at CERN will be housed in the tunnel of the Large Electron Positron collider (LEP) and will store two counter-rotating proton beams with energies of up to 7 TeV in a 27 km accelerator/storage ring with superconducting magnets. The vacuum system for the LHC will be at cryogenic temperatures (between 1.9 and 20 K) and will be exposed to synchrotron radiation emitted by the protons. A stringent limitation on the vacuum is given by the energy deposition in the superconducting coils of the magnets due to nuclear scattering of the protons on residual gas molecules because this may provoke a quench. This effect imposes an upper limit to a local region of increased gas density (e.g. a leak), while considerations of beam lifetime (100 h) will determine more stringent requirements on the average gas density. The proton beam creates ions from the residual gas which may strike the vacuum chamber with sufficient energy to lead to a pressure 'run-away' when the net ion induced desorption yield exceeds a stable limit. These dynamic pressure effects will be limited to an acceptable level by installing a perforated 'beam screen' which shields the cryopumped gas molecules at 1.9 K from synchrotron radiation and which also absorbs the synchrotron radiation power at a higher and, therefore, thermodynamically more efficient temperature. (author)

  10. Proposed Physics Experiments for Laser-Driven Electron Linear Acceleration in a Dielectric Loaded Vacuum, Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Byer, Robert L. [Stanford Univ., CA (United States). Dept. of Applied Physics. Edward L. Ginzton Lab.

    2016-07-08

    This final report summarizes the last three years of research on the development of advanced linear electron accelerators that utilize dielectric wave-guide vacuum channels pumped by high energy laser fields to accelerate beams of electrons.

  11. Ultrahigh vacuum system of the heavy ion transport line at Brookhaven

    International Nuclear Information System (INIS)

    Hseuh, H.C.; Feigenbaum, I.; Manni, M.; Stattel, P.; Skelton, R.

    1985-01-01

    Heavy ions with an energy up to 8 MeV/A for S +16 and 1 MeV/A for Au +34 from the 16 MV Tandem will be injected into the AGS for further acceleration to less than or equal to 15 GeV/A. A 600-meter beam transport line between the Tandem and the AGS has been designed and is under construction. This paper describes the design of the vacuum system of this transport line and the performance of the prototype vacuum sectors

  12. Vacuum system control for the Heavy Ion Transport Line

    International Nuclear Information System (INIS)

    Stattel, P.; Feigenbaum, I.; Hseuh, H.C.; Robinson, T.; Skelton, R.; Wong, V.

    1987-01-01

    The Brookhaven AGS, 807 m in circumference, and the Tandem Van de Graaff are now joined together by a transport line, 600 m in length. This now allows heavy ions from the Tandem, up to fully stripped sulfur (M = 32) to be transported into the AGS and accelerated to 15 GeV/A. With the addition of a booster between the Tandem and the AGS in the near future, heavy ions such as gold (M = 200) can be accelerated to 30 Z/A GeV/A. This paper describes the HITL (Heavy Ion Transport Line) vacuum control system design and implementation

  13. Vacuum-to-air interface for the advanced test accelerator beam director

    International Nuclear Information System (INIS)

    Cruz, G.E.; Edwards, W.F.; Kavanagh, D.P.; Addis, R.B.; Weiss, W.C.; Livenspargar, C.M.

    1986-01-01

    A vacuum-to-air transition was created to facilitate the Lawrence Livermore National Laboratory's Advanced Test Accelerator (ATA) electron beam 1-Hz pulse rate. It is necessary that a pulsed particle beam go from a region at 10 -6 torr through a 1-cm-diam maximum aperture into a region at 760 torr. This must be accomplished without the use of windows or solid barriers. Two tests will be conducted on the vacuum-to-air interface. The first determines pressure profiles through 1.0-mm- and 10.0-mm-diam orifices. The second test employs an expendable foil and foil advancement mechanism. In this paper, the experimental results of the orifice test are presented and the analytical results are compared with the empirical results. The foil advancement test will be documented after the test is completed. The mechanism serves both as an orifice and as a fast-acting vacuum valve. In operation, the electron beam penetrates the thin foil, thereby creating an aperture of minimum geometry. During the balance of the pulse cycle, after the beam duration, the foil is advanced to seal the opening and recover the almost negligible loss in vacuum

  14. Dirac vacuum: Acceleration and external-field effects

    International Nuclear Information System (INIS)

    Jauregui, R.; Torres, M.; Hacyan, S.

    1991-01-01

    The quantization of the massive spin-1/2 field in Rindler coordinates is considered, including the effects of a background magnetic field. We calculate the expectation values of conserved quantities such as the stress-energy tensor, current density, and spin distribution, as detected by an accelerated observer. The ratio of the energy and particle densities is given by a Fermi-Dirac distribution, but the spectrum of these quantities takes in general a complicated form that cannot be simply interpreted as a thermal spectrum. For the free-particle case the spectrum of the energy-stress tensor has a Fermi-Dirac form only in the massless limit. In the presence of the magnetic field the Dirac vacuum is magnetized and exhibits plasmalike properties

  15. Ultra high vacuum technology

    CERN Multimedia

    CERN. Geneva

    2001-01-01

    A short introduction for some basic facts and equations. Subsquently, discussion about: Building blocks of an ultrahigh vacuum system - Various types of pumps required to reach uhv and methods to reduce these effects - Outgassing phenomena induced by the presence of a particle beam and the most common methods to reduce these effects It will be given some practical examples from existing CERN accelerators and discuss the novel features of the future LHC vacuum system.

  16. The development for C-band whole sealed vacuum accelerating tuber

    International Nuclear Information System (INIS)

    Zhou Wenzhen; Zhang Xiangyang; Ding Shulin; Hu Jinquan; Yang Zhenyuan

    1999-01-01

    S-Band standing wave electron linacs have got wide-ranging application for industry nondestructive testing and formed varied kinds of products. X-band electron linac for NDT has been developed by Schonberg Company USA in 1985. Because of bigger structure of S-band linac and difficult machining of X-Band linac, an C-band portable linac for NDT has been developed in CIAE at present, a whole sealed vacuum accelerating tuber will be given here. It consists of 4 cavities, the phase velocity of the first two cavities is 0.5 and 0.9, respectively, and that of the second two cavities is 1. The high power testing proved that the design of the accelerating tuber is good for 1.5 MeV electron linac for NDT

  17. Shiva and Argus target diagnostics vacuum systems

    International Nuclear Information System (INIS)

    Glaros, S.S.; Mayo, S.E.; Campbell, D.; Holeman, D.

    1978-09-01

    The normal operation of LLL's Argus and Shiva laser irradiation facilities demand a main vacuum system for the target chamber and a separate local vacuum system for each of the larger appendage dianostics. This paper will describe the Argus and Shiva main vacuum systems, their respective auxiliary vacuum systems and the individual diagnostics with their respective special vacuum requirements and subsequent vacuum systems. Our latest approach to automatic computer-controlled vacuum systems will be presented

  18. Vacuum system for the test accumulation ring for the NUMATRON project (TARN)

    International Nuclear Information System (INIS)

    Mizobuchi, Akira

    1979-01-01

    The vacuum system for the test accumulation ring for the NUMATRON project (TARN) being constructed in the Institute for Nuclear Study, University of Tokyo, for the purpose of accumulating fundamental data on high energy, heavy ion acceleration is presented. The main specifications of TARN are as follows: repetition rate 1 Hz, average radius 5.06 m, the radius of curvature 1.333 m, circumference 31.795 m, the length of a unit cell 3.974 m, the length of a long straight section 1.8 m, the number of unit cells 8, superperiodicity 8, and the structure of a unit cell FODO. The vacuum level of TARN lower than 1 x 10 -10 Torr is necessary. The preliminary test apparatuses, number one and two, for obtaining the basic data on superhigh vacuum were constructed. The characteristics of a molecular vacuum pump and the high temperature baking effect were tested with the number one test apparatus. The glow discharge cleaning effect of the model vacuum chamber for deflecting magnets was tested, utilizing the number two test apparatus. The pressure curve in course of time during pump down, the residual gas components, the residual gas spectrum in vacuum state and the change of residual gas components before and after the glow discharge cleaning are shown as these testing results. The vacuum gauges, which are used for TARN for measuring both the total pressure and the partial pressure of gas, are explained. The vacuum system, the vacuum chamber, the vacuum pumps, the expected exhausting speed and the partial functional test results for the vacuum system are introduced. (Nakai, Y.)

  19. Application of high power microwave vacuum electron devices

    International Nuclear Information System (INIS)

    Ding Yaogen; Liu Pukun; Zhang Zhaochuan; Wang Yong; Shen Bin

    2011-01-01

    High power microwave vacuum electron devices can work at high frequency, high peak and average power. They have been widely used in military and civil microwave electron systems, such as radar, communication,countermeasure, TV broadcast, particle accelerators, plasma heating devices of fusion, microwave sensing and microwave heating. In scientific research, high power microwave vacuum electron devices are used mainly on high energy particle accelerator and fusion research. The devices include high peak power klystron, CW and long pulse high power klystron, multi-beam klystron,and high power gyrotron. In national economy, high power microwave vacuum electron devices are used mainly on weather and navigation radar, medical and radiation accelerator, TV broadcast and communication system. The devices include high power pulse and CW klystron, extended interaction klystron, traveling wave tube (TWT), magnetron and induced output tube (IOT). The state of art, common technology problems and trends of high power microwave vacuum electron devices are introduced in this paper. (authors)

  20. Control system technology for particle accelerators

    International Nuclear Information System (INIS)

    Tsumura, Yoshihiko; Matsuo, Keiichi; Maruyama, Takayuki.

    1995-01-01

    Control systems for particle accelerators are being designed around open-architecture systems, which allows easy upgrading, high-speed networks and high-speed processors. Mitsubishi Electric is applying realtime Unix operating systems, fiber-distributed data interface (FDDI), shared memory networks and remote I/O systems to achieve these objectives. In the area of vacuum control systems, which requires large-scale sequence control, the corporation is employing general-purpose programmable logic controllers (PLCs) to achieve cost-effective design. Software for these applications is designed around a library of application program interfaces (APIs) that give users direct access to key system functions. (author)

  1. Vacuum improvements for ultra high charge state ion acceleration

    International Nuclear Information System (INIS)

    Xie, Z.Q.; Lyneis, C.M.; Clark, D.J.; Guy, A.; Lundgren, S.A

    1998-06-01

    The installation of a second cryo panel has significantly improved the vacuum in the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory. The neutral pressure in the extraction region decreased from 1.2 x 10 -6 down to about 7 x 10 -7 Torr. The vacuum improvement reduces beam loss from charge changing collisions and enhances the cyclotron beam transmission, especially for the high charge state heavy ions. Tests with improved vacuum show the cyclotron transmission increased more than 50% (from 5.7% to 9.0%) for a Xe 27+ at 603 MeV, more than doubled for a Bi 41+ beam (from 1.9% to 4.6%) at 904 MeV and tripled for a U 47+ beam (from 1.2% to 3.6%) at 1,115 MeV. At about 5 NeV/nucleon 92 enA (2.2 pnA) for Bi 41+ and 14 enA (0.3 pnA) for U 47+ were extracted ut of the 88-Inch Cyclotron Ion beams with charge states as high as U 64+ have been produced by the LBNL AECR-U ion source and accelerated through the cyclotron for the first time. The beam losses for a variety of ultra high charge state ions were measured as a function of cyclotron pressure and compared with the calculations from the existing models

  2. Vacuum improvements for ultra high charge state ion acceleration

    International Nuclear Information System (INIS)

    Xie, Z.Q.; Lyneis, C.M.; Clark, D.J.; Guy, A.; Lundgren, S.A.

    1999-01-01

    The installation of a second cryo panel has significantly improved the vacuum in the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory. The neutral pressure in the extraction region decreased from 1.2 x 10 -6 down to about 7 x 10 -7 Torr. The vacuum improvement reduces beam loss from charge changing collisions and enhances the cyclotron beam transmission, especially for the high charge state heavy ions. Tests with improved vacuum show the cyclotron transmission increased more than 50% (from 5.7% to 9.0%) for a Xe 27+ at 603 MeV, more than doubled for a Bi 41+ beam (from 1.9% % to 4.6%) at 904 MeV and tripled for a U 47+ beam (from 1.2% to 3.6%) at 1115 MeV. At about 5 MeV/nucleon 92 enA (2.2 pnA) for Bi 41+ and 14 enA (0.3 pnA) for U 47+ were extracted out of the 88-Inch Cyclotron Ion beams with charge states as high as U 64+ have been produced by the LBNL AECR-U ion source and accelerated through the cyclotron for the first time. The beam losses for a variety of ultra high charge state ions were measured as a function of cyclotron pressure and compared with the calculations from the existing models. (authors)

  3. Quality Management of CERN Vacuum Controls

    CERN Document Server

    Antoniotti, F; Fortescue-Beck, E; Gama, J; Gomes, P; Le Roux, P; Pereira, H F; Pigny, G

    2014-01-01

    The vacuum controls Section (TE-VSC-ICM) is in charge of the monitoring, maintenance and consolidation of the control systems of all accelerators and detectors in CERN; this represents 6 000 instruments distributed along 128 km of vacuum chambers, often of heterogeneous architectures and of diverse

  4. FRIB driver linac vacuum model and benchmarks

    CERN Document Server

    Durickovic, Bojan; Kersevan, Roberto; Machicoane, Guillaume

    2014-01-01

    The Facility for Rare Isotope Beams (FRIB) is a superconducting heavy-ion linear accelerator that is to produce rare isotopes far from stability for low energy nuclear science. In order to achieve this, its driver linac needs to achieve a very high beam current (up to 400 kW beam power), and this requirement makes vacuum levels of critical importance. Vacuum calculations have been carried out to verify that the vacuum system design meets the requirements. The modeling procedure was benchmarked by comparing models of an existing facility against measurements. In this paper, we present an overview of the methods used for FRIB vacuum calculations and simulation results for some interesting sections of the accelerator. (C) 2013 Elsevier Ltd. All rights reserved.

  5. Modification of Ultra-High Vacuum Surfaces Using Free Radicals

    CERN Document Server

    Vorlaufer, G

    2002-01-01

    In ultra-high vacuum systems outgassing from vacuum chamber walls and desorption of surface adsorbates are usually the factors which determine pressure and residual gas composition. In particular in beam vacuum systems of accelerators like the LHC, where surfaces are exposed to intense synchrotron radiation and bombardment by energetic ions and electrons, surface properties like the molecular desorption yield or secondary electron yield can strongly influence the performance of the accelerator. Well-established treatment methods like vacuum bake-out or glow-discharge cleaning have been successfully applied in the past to condition ultra-high vacuum surfaces, but these methods are sometimes difficult to carry out, for example if the vacuum chambers are not accessible. In this work, an alternative treatment method is investigated. This method is based on the strong chemical reactivity of free radicals, electrically neutral fragments of molecules. Free radicals (in the case of this work, nitrogen and oxygen radi...

  6. The LACARA Vacuum Laser Accelerator Experiment: Beam Positioning and Alignment in a Strong Magnetic Field

    International Nuclear Information System (INIS)

    Shchelkunov, Sergey V.; Marshall, T. C.; Hirshfield, J. L.; Wang, Changbiao; LaPointe, M. A.

    2006-01-01

    LACARA (laser cyclotron auto-resonance accelerator) is a vacuum laser accelerator of electrons that is under construction at the Accelerator Test Facility (ATF), Brookhaven National Laboratory. It is expected that the experiment will be assembled by September 2006; this paper presents progress towards this goal. According to numerical studies, as an electron bunch moves along the LACARA solenoidal magnetic field (∼5.2 T, length ∼1 m), it will be accelerated from 50 to ∼75 MeV by interacting with a 0.8 TW Gaussian-mode circularly polarized optical pulse provided by the ATF CO2 10.6μm laser system. The LACARA laser transport optics must handle 10 J and be capable of forming a Gaussian beam inside the solenoid with a 1.4 mm waist and a Rayleigh range of 60 cm. The electron optics must transport a bunch having input emittance of 0.015 mm-mrad and 100 μm waist through the magnet. Precision alignment between the electron beam and the solenoid magnetic axis is required, and a method to achieve this is described in detail. Emittance- filtering may be necessary to yield an accelerated bunch having a narrow (∼1%) energy-spread

  7. Vacuum production; Produccion de vacio

    Energy Technology Data Exchange (ETDEWEB)

    Segovia, J. L. de

    2010-07-01

    Since the advent of ultra high vacuum in 1958 has been a great demand for new as means of production and to meet the process needs to be done: industry heavy, high technology and space research areas, large accelerator systems particles or nuclear fusion. In this paper we explore the modern media production: dry vacuum pumps, turbo pumps, pump status diffusion ion pumps and cryopumps. (Author)

  8. Introduction to the magnet and vacuum systems of an electron storage ring

    International Nuclear Information System (INIS)

    Weng, W.T.

    1982-01-01

    An accelerator or storage ring complex is a concerted interplay of various functional systems. For the convenience of discussion we can divide it into the following systems: injector, magnet, RF, vacuum, instrumentation and control. In addition, the conventional construction of the building and radiation safety consideration are also needed and finally the beam lines, detector, data acquisition and analysis set-ups for research programs. Dr. L. Teng has given a comprehensive review of the whole complex and the operation of such a facility. I concentrate on the description of magnet and vacuum systems. Only the general function of each system and the basic design concepts will be introduced, no detailed engineering practice will be given which will be best done after a machine design is produced. For further understanding and references a table of bibliography is provided at the end of the paper

  9. Acceleration of the universe, vacuum metamorphosis, and the large-time asymptotic form of the heat kernel

    International Nuclear Information System (INIS)

    Parker, Leonard; Vanzella, Daniel A.T.

    2004-01-01

    We investigate the possibility that the late acceleration observed in the rate of expansion of the Universe is due to vacuum quantum effects arising in curved spacetime. The theoretical basis of the vacuum cold dark matter (VCDM), or vacuum metamorphosis, cosmological model of Parker and Raval is reexamined and improved. We show, by means of a manifestly nonperturbative approach, how the infrared behavior of the propagator (related to the large-time asymptotic form of the heat kernel) of a free scalar field in curved spacetime leads to nonperturbative terms in the effective action similar to those appearing in the earlier version of the VCDM model. The asymptotic form that we adopt for the propagator or heat kernel at large proper time s is motivated by, and consistent with, particular cases where the heat kernel has been calculated exactly, namely in de Sitter spacetime, in the Einstein static universe, and in the linearly expanding spatially flat Friedmann-Robertson-Walker (FRW) universe. This large-s asymptotic form generalizes somewhat the one suggested by the Gaussian approximation and the R-summed form of the propagator that earlier served as a theoretical basis for the VCDM model. The vacuum expectation value for the energy-momentum tensor of the free scalar field, obtained through variation of the effective action, exhibits a resonance effect when the scalar curvature R of the spacetime reaches a particular value related to the mass of the field. Modeling our Universe by an FRW spacetime filled with classical matter and radiation, we show that the back reaction caused by this resonance drives the Universe through a transition to an accelerating expansion phase, very much in the same way as originally proposed by Parker and Raval. Our analysis includes higher derivatives that were neglected in the earlier analysis, and takes into account the possible runaway solutions that can follow from these higher-derivative terms. We find that the runaway solutions do

  10. Proof-of-principle experiment of the vacuum beat wave accelerator

    International Nuclear Information System (INIS)

    Ting, A.; Krushelnick, K.; Esarey, E.; Sprangle, P.

    1997-01-01

    The vacuum beat wave accelerator (VBWA) is discussed and design parameters for proof-of-principle experiment are presented. The VBWA utilizes two focused laser beams of differing wavelengths to generate a beat wave that can impart a net acceleration to charged particles. Theory and simulations show that the single-stage energy gain of the VBWA is limited by diffraction of the laser beams, particle slippage in phase and velocity, and radial walk-off. In the simulations the particles are synchronous with the beat wave for a short interval of time and the energy gain has the nature of an impulse delivered near the focal region. Simulations also show that the problem of radial walk-off may be ameliorated by using a converging beam of particles. For terawatt-level laser beams, with wavelengths 1 μm and 0.5 μm, and a 4.5 MeV finite-emittance electron beam the energy can be increased to ∼12.5MeV in a non-synchronous interaction over a distance of under 4 mm, with a peak acceleration gradient >15GeV/m and an estimated trapping fraction of -1%. copyright 1997 American Institute of Physics

  11. Quality Management of CERN Vacuum Controls

    CERN Document Server

    Antoniotti, F; Fortescue-Beck, E; Gama, J; Gomes, P; Le Roux, P; Pereira, H; Pigny, G

    2014-01-01

    The vacuum controls Section (TE-VSC-ICM) is in charge of the monitoring, maintenance and consolidation of the control systems of all accelerators and detectors in CERN; this represents 6 000 instruments distributed along 128 km of vacuum chambers, often of heterogeneous architectures and of diverse technical generations. In order to improve the efficiency of the services provided by ICM, to vacuum experts and to accelerator operators, a Quality Management Plan is being put into place. The first step was the standardization of the naming convention across different accelerators. The traceability of problems, requests, repairs, and other actions, has also been put into place (VTL). This was combined with the effort to identify each individual device by a coded label, and register it in a central database (MTF). Occurring in parallel, was the gathering of old documents and the centralization of information concerning architectures, procedures, equipment and settings (EDMS). To describe the topology of control c...

  12. ITER diagnostic system: Vacuum interface

    Energy Technology Data Exchange (ETDEWEB)

    Patel, K.M., E-mail: Kaushal.Patel@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Udintsev, V.S.; Hughes, S.; Walker, C.I.; Andrew, P.; Barnsley, R.; Bertalot, L. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Drevon, J.M. [Bertin Technologies, BP 22, 13762 Aix-en Provence cedex 3 (France); Encheva, A. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Kashchuk, Y. [Institution “PROJECT CENTER ITER”, 1, Akademika Kurchatova pl., Moscow (Russian Federation); Maquet, Ph. [Bertin Technologies, BP 22, 13762 Aix-en Provence cedex 3 (France); Pearce, R.; Taylor, N.; Vayakis, G.; Walsh, M.J. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France)

    2013-10-15

    Diagnostics play an essential role for the successful operation of the ITER tokamak. They provide the means to observe control and to measure plasma during the operation of ITER tokamak. The components of the diagnostic system in the ITER tokamak will be installed in the vacuum vessel, in the cryostat, in the upper, equatorial and divertor ports, in the divertor cassettes and racks, as well as in various buildings. Diagnostic components that are placed in a high radiation environment are expected to operate for the life of ITER. There are approx. 45 diagnostic systems located on ITER. Some diagnostics incorporate direct or independently pumped extensions to maintain their necessary vacuum conditions. They require a base pressure less than 10{sup −7} Pa, irrespective of plasma operation, and a leak rate of less than 10{sup −10} Pa m{sup 3} s{sup −1}. In all the cases it is essential to maintain the ITER closed fuel cycle. These directly coupled diagnostic systems are an integral part of the ITER vacuum containment and are therefore subject to the same design requirements for tritium and active gas confinement, for all normal and accidental conditions. All the diagnostics, whether or not pumped, incorporate penetration of the vacuum boundary (i.e. window assembly, vacuum feedthrough etc.) and demountable joints. Monitored guard volumes are provided for all elements of the vacuum boundary that are judged to be vulnerable by virtue of their construction, material, load specification etc. Standard arrangements are made for their construction and for the monitoring, evacuating and leak testing of these volumes. Diagnostic systems are incorporated at more than 20 ports on ITER. This paper will describe typical and particular arrangements of pumped diagnostic and monitored guard volume. The status of the diagnostic vacuum systems, which are at the start of their detailed design, will be outlined and the specific features of the vacuum systems in ports and extensions

  13. ITER diagnostic system: Vacuum interface

    International Nuclear Information System (INIS)

    Patel, K.M.; Udintsev, V.S.; Hughes, S.; Walker, C.I.; Andrew, P.; Barnsley, R.; Bertalot, L.; Drevon, J.M.; Encheva, A.; Kashchuk, Y.; Maquet, Ph.; Pearce, R.; Taylor, N.; Vayakis, G.; Walsh, M.J.

    2013-01-01

    Diagnostics play an essential role for the successful operation of the ITER tokamak. They provide the means to observe control and to measure plasma during the operation of ITER tokamak. The components of the diagnostic system in the ITER tokamak will be installed in the vacuum vessel, in the cryostat, in the upper, equatorial and divertor ports, in the divertor cassettes and racks, as well as in various buildings. Diagnostic components that are placed in a high radiation environment are expected to operate for the life of ITER. There are approx. 45 diagnostic systems located on ITER. Some diagnostics incorporate direct or independently pumped extensions to maintain their necessary vacuum conditions. They require a base pressure less than 10 −7 Pa, irrespective of plasma operation, and a leak rate of less than 10 −10 Pa m 3 s −1 . In all the cases it is essential to maintain the ITER closed fuel cycle. These directly coupled diagnostic systems are an integral part of the ITER vacuum containment and are therefore subject to the same design requirements for tritium and active gas confinement, for all normal and accidental conditions. All the diagnostics, whether or not pumped, incorporate penetration of the vacuum boundary (i.e. window assembly, vacuum feedthrough etc.) and demountable joints. Monitored guard volumes are provided for all elements of the vacuum boundary that are judged to be vulnerable by virtue of their construction, material, load specification etc. Standard arrangements are made for their construction and for the monitoring, evacuating and leak testing of these volumes. Diagnostic systems are incorporated at more than 20 ports on ITER. This paper will describe typical and particular arrangements of pumped diagnostic and monitored guard volume. The status of the diagnostic vacuum systems, which are at the start of their detailed design, will be outlined and the specific features of the vacuum systems in ports and extensions will be described

  14. Materials for high vacuum technology, an overview

    CERN Document Server

    Sgobba, Stefano

    2007-01-01

    In modern accelerators stringent requirements are placed on materials of vacuum systems. Their physical and mechanical properties, machinability, weldability or brazeability are key parameters. Adequate strength, ductility, magnetic properties at room as well as low temperatures are important factors for vacuum systems of accelerators working at cryogenic temperatures, such as the Large Hadron Collider (LHC) under construction at CERN. In addition, baking or activation of Non-Evaporable Getters (NEG) at high temperatures impose specific choices of material grades of suitable tensile and creep properties in a large temperature range. Today, stainless steels are the dominant materials of vacuum constructions. Their metallurgy is extensively treated. The reasons for specific requirements in terms of metallurgical processes are detailed, in view of obtaining adequate purity, inclusion cleanliness, and fineness of the microstructure. In many cases these requirements are crucial to guarantee the final leak tightnes...

  15. Collective ion acceleration in the system with an isolated anode

    Energy Technology Data Exchange (ETDEWEB)

    Bystritskii, V M; Didenko, A N; Krasik, Ya E; Lopatin, V S; Podkatov, V I [Tomskij Politekhnicheskij Inst. (USSR). Inst. Yadernoj Fiziki, Ehlektroniki i Avtomatiki

    1980-01-01

    Processes of collective proton acceleration in vacuum are studied in the system of an isolated anode and isolated or earthed electrodes located behind the anode on heavy-current electron accelerators ''Tonus'' and ''Vera''. The effect of external conditions and electron beam parameters on the efficiency of accelerating processes is studied. The effect of the presence of a charge pre-pulse and the number of the after-anode electrodes on the energy of accelerated energy electrons is studied. In the system with a single anode the proton yield is Nsub(p)=10sup(14) at 2Esub(e)system with three after-anode electrodes. Possible mechanism of proton acceleration is discussed. The results are compared with those obtained elsewhere. Possibilities to increase the efficiency of this acceleration method are considered.

  16. Analytical solutions for a single vertical drain with time-dependent vacuum combined surcharge preloading in membrane and membraneless systems

    International Nuclear Information System (INIS)

    Geng, X Y; Indraratna, B; Rujikiatkamjorn, C

    2010-01-01

    Vertical drains combined with vacuum pressure and surcharge preloading are widely used to accelerate the consolidation process of soft clay in order to decrease the pore pressure as well as to increase the effective stress. Currently there are two types of vacuum preloading systems commercially available; (a) membrane system with an airtight membrane over the drainage layer and, (b) membraneless system where a vacuum system is connected to individual drain. Their effectiveness varies from site to site depending on the type of soil treated and the characteristics of the drain-vacuum system. This study presents the analytical solutions of vertical drains with vacuum preloading for both membrane and membraneless systems. According to the field and laboratory observations, the vacuum in both of the membraneless and membrane system was assumed to be decreasing along the drain whereas in the membrane system, it was maintained at a constant level. This model was verified by using the measured settlements and excess pore pressures obtained from large-scale laboratory testing and case studies in Australia. The analytical solutions improved the accuracy of predicting the dissipation of pore water pressure and the associated settlement. The effects of the permeability of the sand blanket in a membrane system and the possible loss of vacuum were also discussed.

  17. DC photogun vacuum characterization through photocathode lifetime studies

    International Nuclear Information System (INIS)

    Marcy Stutzman; Joseph Grames; Matt Poelker; Kenneth Surles-Law; Philip Adderley

    2007-01-01

    Excellent vacuum is essential for long photocathode lifetimes in DC high voltage photoelectron guns. Vacuum Research at Thomas Jefferson National Accelerator Facility has focused on characterizing the existing vacuum systems at the CEBAF polarized photoinjector and on quantifying improvements for new systems. Vacuum chamber preprocessing, full activation of NEG pumps and NEG coating the chamber walls should improve the vacuum within the electron gun, however, pressure measurement is difficult at pressures approaching the extreme-high-vacuum (XHV) region and extractor gauge readings are not significantly different between the improved and original systems. The ultimate test of vacuum in a DC high voltage photogun is the photocathode lifetime, which is limited by the ionization and back-bombardment of residual gasses. Discussion will include our new load-locked gun design as well as lifetime measurements in both our operational and new photo-guns, and the correlations between measured vacuum and lifetimes will be investigated

  18. 21 CFR 884.5070 - Vacuum abortion system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  19. Cosmic vacuum

    International Nuclear Information System (INIS)

    Chernin, Artur D

    2001-01-01

    Recent observational studies of distant supernovae have suggested the existence of cosmic vacuum whose energy density exceeds the total density of all the other energy components in the Universe. The vacuum produces the field of antigravity that causes the cosmological expansion to accelerate. It is this accelerated expansion that has been discovered in the observations. The discovery of cosmic vacuum radically changes our current understanding of the present state of the Universe. It also poses new challenges to both cosmology and fundamental physics. Why is the density of vacuum what it is? Why do the densities of the cosmic energy components differ in exact value but agree in order of magnitude? On the other hand, the discovery made at large cosmological distances of hundreds and thousands Mpc provides new insights into the dynamics of the nearby Universe, the motions of galaxies in the local volume of 10 - 20 Mpc where the cosmological expansion was originally discovered. (reviews of topical problems)

  20. Cosmic vacuum

    Energy Technology Data Exchange (ETDEWEB)

    Chernin, Artur D [P.K. Shternberg State Astronomical Institute at the M.V. Lomonosov Moscow State University, Moscow (Russian Federation)

    2001-11-30

    Recent observational studies of distant supernovae have suggested the existence of cosmic vacuum whose energy density exceeds the total density of all the other energy components in the Universe. The vacuum produces the field of antigravity that causes the cosmological expansion to accelerate. It is this accelerated expansion that has been discovered in the observations. The discovery of cosmic vacuum radically changes our current understanding of the present state of the Universe. It also poses new challenges to both cosmology and fundamental physics. Why is the density of vacuum what it is? Why do the densities of the cosmic energy components differ in exact value but agree in order of magnitude? On the other hand, the discovery made at large cosmological distances of hundreds and thousands Mpc provides new insights into the dynamics of the nearby Universe, the motions of galaxies in the local volume of 10 - 20 Mpc where the cosmological expansion was originally discovered. (reviews of topical problems)

  1. The Study of Advanced Accelerator Physics Research at UCLA Using the ATF at BNL: Vacuum Acceleration by Laser of Free Electrons

    International Nuclear Information System (INIS)

    Cline, David B.

    2016-01-01

    An experiment was designed and data were taken to demonstrate that a tightly focused laser on vacuum can accelerate an electron beam in free space. The experiment was proof-of-principle and showed a clear effect for the laser beam off and on. The size of the effect was about 20% and was consistent over 30 laser and beam shots.

  2. Automation of Aditya vacuum control system based on CODAC Core System

    Energy Technology Data Exchange (ETDEWEB)

    Raulji, Vismaysinh D., E-mail: vismay@ipr.res.in; Pujara, Harshad; Arambhadiya, Bharat; Jadeja, Kumarpalsinh; Bhatt, Shailesh; Rajpal, Rachana

    2016-11-15

    Highlights: • Monitor and control of vacuum control system based on CODAC Core System. • Communication between SIEMENS PLC and open source software EPICS. • With CODAC Core easy to configure and programming of slow controller. - Abstract: The main objective of vacuum control system is to provide ultrahigh vacuum for Aditya Tokamak operations. Aditya Vacuum vessel is having four vacuum pumping lines. To demonstrate implementation of automation; a study case is under taken by automating single Pumping Line of the Aditya vacuum system using CODAC Core System (CCS). Currently, vacuum system is operated manually. The CCS based control system allows remote control, monitoring, alarm handling of vacuum parameters. The CODAC Core System is the Linux based software package that is distributed by ITER Organization for the development of Plant System I&C software. CODAC Core System includes EPICS, CSS (Control System Studio) etc. CSS is used for HMI (Human Machine Interface), alarms and archives. SDD (Self Description Data) tool is used to configure plant system I&C. SDD Editor is an Eclipse based application to define the plant system, interface, I&C component, interfaced signals, configure variable. SCADA (Supervisory Control and Data Acquisition) system is developed in CSS. Data is transferred between PLC and CSS through EPICS. The complete system is tested with Aditya Vacuum Control System with process interlocks. Operator interface is also developed using Lab VIEW as a choice of the user. This paper will describe the salient features of the developed control system in detail.

  3. Particle contamination in vacuum systems

    International Nuclear Information System (INIS)

    Martignac, J.; Bonin, B.; Henriot, C.; Poupeau, J.P.; Koltchakian, I.; Kocic, D.; Herbeaux, Ch.; Marx, J.P.

    1996-01-01

    Many vacuum devices, like RF cavities, are sensitive to particle contamination. This fact has motivated a considerable effort of cleanliness from the SRF community. The present paper reports the first results of a general study trying to identify the most contaminating steps during assembly and vacuum operation of the cavity. The steps investigated here are gasket assembly, evacuation and venting of the vacuum system, and operation of sputter ion pumps. (author)

  4. Particle contamination in vacuum systems

    International Nuclear Information System (INIS)

    Martignac, J.; Bonin, B.; Henriot, C.; Poupeau, J.P.; Koltchakian, I.; Kocic, D.; Herbeaux, Ch.; Marx, J.P.

    1996-01-01

    Many vacuum devices, like RF cavities, are sensitive to particle contamination. This fact has motivated a considerable effort of cleanliness from the SRF community. The first results of a general study trying to identify the most contaminating steps during assembly and vacuum operation of the cavity is reported. The steps investigated here are gasket assembly, evacuation and venting of the vacuum system, and operation of sputter ion pumps. (author)

  5. Design foundation of vacuum system for electron beam machine

    International Nuclear Information System (INIS)

    Darsono; Suprapto; Djasiman

    1999-01-01

    Vacuum system is a main part of electron beam Machine because (EBM) the electron can not be produced without this vacuum. Vacuum system consists of vacuum pump, connecting pipe, valve, and vacuum gauge. The design vacuum system of EBM, basis knowledge and technology of vacuum is needed. The paper describes types of vacuum pump, calculation of pipe conductance and pumping time of vacuum system then there are used as consideration of criteria to choose vacuum pump for EBM. From the result of study, it is concluded that for EBM of 500 keV/10 mA which is going to use for wood coating and with consideration of economic and technic factor it is better to use diffusion pump. (author)

  6. Advanced Photon Source accelerator ultrahigh vacuum guide

    International Nuclear Information System (INIS)

    Liu, C.; Noonan, J.

    1994-03-01

    In this document the authors summarize the following: (1) an overview of basic concepts of ultrahigh vacuum needed for the APS project, (2) a description of vacuum design and calculations for major parts of APS, including linac, linac waveguide, low energy undulator test line, positron accumulator ring (PAR), booster synchrotron ring, storage ring, and insertion devices, and (3) cleaning procedures of ultrahigh vacuum (UHV) components presently used at APS

  7. Development of vacuum brazing furnace

    International Nuclear Information System (INIS)

    Singh, Rajvir; Yedle, Kamlesh; Jain, A.K.

    2005-01-01

    In joining of components where welding process is not possible brazing processes are employed. Value added components, high quality RF systems, UHV components of high energy accelerators, carbide tools etc. are produced using different types of brazing methods. Furnace brazing under vacuum atmosphere is the most popular and well accepted method for production of the above mentioned components and systems. For carrying out vacuum brazing successfully it is essential to have a vacuum brazing furnace with latest features of modern vacuum brazing technology. A vacuum brazing furnace has been developed and installed for carrying out brazing of components of copper, stainless steel and components made of dissimilar metals/materials. The above furnace has been designed to accommodate jobs of 700mm diameter x 2000mm long sizes with job weight of 500kgs up to a maximum temperature of 1250 degC at a vacuum of 5 x 10 -5 Torr. Oil diffusion pumping system with a combination of rotary and mechanical booster pump have been employed for obtaining vacuum. Molybdenum heating elements, radiation shield of molybdenum and Stainless Steel Grade 304 have been used. The above furnace is computer controlled with manual over ride facility. PLC and Pentium PC are integrated together to maneuver steps of operation and safety interlocks of the system. Closed loop water supply provides cooling to the system. The installation of the above system is in final stage of completion and it will be ready for use in next few months time. This paper presents insights of design and fabrication of a modern vacuum brazing furnace and its sub-system. (author)

  8. ELETTRA vacuum system

    International Nuclear Information System (INIS)

    Bernardini, M.; Daclon, F.; Giacuzzo, F.; Miertusova, J.; Pradal, F.; Kersevan, R.

    1993-01-01

    Elettra is a third-generation synchrotron light source which is being built especially for the use of high brilliance radiation from insertion devices and bending magnets. The UHV conditions in a storage ring lead to a longer beam lifetime - one of the most important criterion. The Elettra vacuum system presents some pecularities which cannot be found in any already existing machine. The final version of bending magnet vacuum chamber is presented. After chemical and thermal conditioning the specific outgassing rate of about 1.5e-12 Torr. liters sec -1 cm -2 was obtained. A microprocessor-controlled system has been developed to perform bake-out at the uniform temperature. The etched-foil type heaters are glued to the chamber and Microtherm insulation is used. UHV pumps based on standard triode sputter-ion pumps were modified with ST 707 NEG (Non Evaporable Getter) modules. A special installation enables the resistive activation of getters and significantly increases pumping speed for hydrogen and other residual gases (except methane and argon). All these technological innovations improve vacuum conditions in Elettra storage ring and consequently also the other parameters of the light source

  9. Compact particle accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Elizondo-Decanini, Juan M.

    2017-08-29

    A compact particle accelerator having an input portion configured to receive power to produce particles for acceleration, where the input portion includes a switch, is provided. In a general embodiment, a vacuum tube receives particles produced from the input portion at a first end, and a plurality of wafer stacks are positioned serially along the vacuum tube. Each of the plurality of wafer stacks include a dielectric and metal-oxide pair, wherein each of the plurality of wafer stacks further accelerate the particles in the vacuum tube. A beam shaper coupled to a second end of the vacuum tube shapes the particles accelerated by the plurality of wafer stacks into a beam and an output portion outputs the beam.

  10. Procurement specification high vacuum test chamber and pumping system

    International Nuclear Information System (INIS)

    1976-01-01

    The specification establishes requirements for a high-vacuum test chamber, associated vacuum pumps, valves, controls, and instrumentation that shall be designed and fabricated for use as a test chamber for testing a closed loop Brayton Isotope Power System (BIPS) Ground Demonstration System (GDS). The vacuum system shall include all instrumentation required for pressure measurement and control of the vacuum pumping system. A general outline of the BIPS-GDS in the vacuum chamber and the preliminary piping and instrumentation interface to the vacuum chamber are shown

  11. First Observation of Laser-Driven Acceleration of Relativistic Electrons in a Semi-Infinite Vacuum Space

    CERN Document Server

    Plettner, Tomas; Colby, Eric R; Cowan, Benjamin; Sears, Chris M S; Siemann, Robert; Smith, Todd I; Spencer, James

    2005-01-01

    We have observed acceleration of relativistic electrons in vacuum driven by a linearly polarized laser beam incident on a thin gold-coated reflective boundary. The observed energy modulation effect follows all the characteristics expected for linear acceleration caused by a longitudinal electric field. As predicted by the Lawson-Woodward theorem the laser driven modulation only appears in the presence of the boundary. It shows a linear dependence with the strength of the electric field of the laser beam and also it is critically dependent on the laser polarization. Finally, it appears to follow the expected angular dependence of the inverse transition radiation process.

  12. CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum

    CERN Document Server

    Baglin, V; Chiggiato, P; Jimenez, JM; Lanza, G

    2014-01-01

    After the Long Shutdown 1 (LS1) and the consolidation of the magnet bus bars, the CERN Large Hadron Collider (LHC) will operate with nominal beam parameters. Larger beam energy, beam intensities and luminosity are expected. Despite the very good performance of the beam vacuum system during the 2010-12 physics run (Run 1), some particular areas require attention for repair, consolidation and upgrade. Among the main activities, a large campaign aiming at the repair of the RF bridges of some vacuum modules is conducted. Moreover, consolidation of the cryogenic beam vacuum systems with burst disk for safety reasons is implemented. In addition, NEG cartridges, NEG coated inserts and new instruments for the vacuum system upgrade are installed. Besides these activities, repair, consolidation and upgrades of other beam equipment such as collimators, kickers and beam instrumentations are carried out. In this paper, the motivation and the description for such activities, together with the expected beam vacuum performa...

  13. Integration Test of the High Voltage Hall Accelerator System Components

    Science.gov (United States)

    Kamhawi, Hani; Haag, Thomas; Huang, Wensheng; Pinero, Luis; Peterson, Todd; Dankanich, John

    2013-01-01

    NASA Glenn Research Center is developing a 4 kilowatt-class Hall propulsion system for implementation in NASA science missions. NASA science mission performance analysis was completed using the latest high voltage Hall accelerator (HiVHAc) and Aerojet-Rocketdyne's state-of-the-art BPT-4000 Hall thruster performance curves. Mission analysis results indicated that the HiVHAc thruster out performs the BPT-4000 thruster for all but one of the missions studied. Tests of the HiVHAc system major components were performed. Performance evaluation of the HiVHAc thruster at NASA Glenn's vacuum facility 5 indicated that thruster performance was lower than performance levels attained during tests in vacuum facility 12 due to the lower background pressures attained during vacuum facility 5 tests when compared to vacuum facility 12. Voltage-Current characterization of the HiVHAc thruster in vacuum facility 5 showed that the HiVHAc thruster can operate stably for a wide range of anode flow rates for discharge voltages between 250 and 600 volts. A Colorado Power Electronics enhanced brassboard power processing unit was tested in vacuum for 1,500 hours and the unit demonstrated discharge module efficiency of 96.3% at 3.9 kilowatts and 650 volts. Stand-alone open and closed loop tests of a VACCO TRL 6 xenon flow control module were also performed. An integrated test of the HiVHAc thruster, brassboard power processing unit, and xenon flow control module was performed and confirmed that integrated operation of the HiVHAc system major components. Future plans include continuing the maturation of the HiVHAc system major components and the performance of a single-string integration test.

  14. Acquisition of reliable vacuum hardware for large accelerator systems

    International Nuclear Information System (INIS)

    Welch, K.M.

    1996-01-01

    Credible and effective communications prove to be the major challenge in the acquisition of reliable vacuum hardware. Technical competence is necessary but not sufficient. We must effectively communicate with management, sponsoring agencies, project organizations, service groups, staff and with vendors. Most of Deming's 14 quality assurance tenets relate to creating an enlightened environment of good communications. All projects progress along six distinct, closely coupled, dynamic phases; all six phases are in a state of perpetual change. These phases and their elements are discussed, with emphasis given to the acquisition phase and its related vocabulary. (author)

  15. Investigation of a vacuum system of the U-240 isochronous cyclotron

    International Nuclear Information System (INIS)

    Bykov, V.I.; Glushko, A.Ya.; Olejnik, E.E.; Prokopenko, V.S.

    1988-01-01

    The investigation results of intensity loss causes of accelerated heavy and H - ions on residual gas in the accelerator chamber were given. The results are compared with the gas inleakage data, performed by the MX-7304 mass-spectrometer. It was shown that the pumping out of heavy molecules of residual gas, inleakage reduction from the source and vacuum hygiene requirement observance, decrease to a considerable degree the ion intensity losses in acceleration process. 8 refs.; 7 figs

  16. Preliminary studies for the LHCb vertex detector vacuum system

    CERN Document Server

    Doets, M; Van Bakel, N; Van den Brand, J F J; van den Brand, Jo

    2000-01-01

    We lay down some general considerations which will serve as a starting point for design studies of a realistic LHCb vertex detector vacuum system. Based on these considerations, we propose a design strategy and identify issues to be further studied. In particular we try to outline some boundary conditions imposed by LHC and LHCb on the vacuum system. We discuss two possibilities for the LHCb vertex detector vacuum system. The preferred strategy uses a differentially pumped vacuum system with the silicon detectors separated from the beam line vacuum. Some estimations on static vacuum pressures and gas flows are presented.

  17. FMIT accelerator

    International Nuclear Information System (INIS)

    Armstrong, D.D.

    1983-01-01

    A 35-MeV 100-mA cw linear accelerator is being designed by Los Alamos for use in the Fusion Materials Irradiation Test (FMIT) Facility. Essential to this program is the design, construction, and evaluation of performance of the accelerator's injector, low-energy beam transport, and radio-frequency quadrupole sections before they are shipped to the facility site. The installation and testing of some of these sections have begun as well as the testing of the rf, noninterceptive beam diagnostics, computer control, dc power, and vacuum systems. An overview of the accelerator systems and the performance to date is given

  18. Vacuum systems for the ILC helical undulator

    CERN Document Server

    Malyshev, O B; Clarke, J A; Bailey, I R; Dainton, J B; Malysheva, L I; Barber, D P; Cooke, P; Baynham, E; Bradshaw, T; Brummitt, A; Carr, S; Ivanyushenkov, Y; Rochford, J; Moortgat-Pick, G A

    2007-01-01

    The International Linear Collider (ILC) positron source uses a helical undulator to generate polarized photons of ∼10MeV∼10MeV at the first harmonic. Unlike many undulators used in synchrotron radiation sources, the ILC helical undulator vacuum chamber will be bombarded by photons, generated by the undulator, with energies mostly below that of the first harmonic. Achieving the vacuum specification of ∼100nTorr∼100nTorr in a narrow chamber of 4–6mm4–6mm inner diameter, with a long length of 100–200m100–200m, makes the design of the vacuum system challenging. This article describes the vacuum specifications and calculations of the flux and energy of photons irradiating the undulator vacuum chamber and considers possible vacuum system design solutions for two cases: cryogenic and room temperature.

  19. Vacuum and fueling systems for the IGNITEX experiment

    International Nuclear Information System (INIS)

    Hallock, G.; Booth, W.D.; Carrera, R.

    1989-01-01

    The results of preliminary studies of the vacuum and fueling requirements for the proposed fusion ignition experiment IGNITEX are presented. An initial design for the vacuum pumping and plasma fueling system is given. The IGNITEX vacuum system must meet the demands of providing sufficient pumping speed to reach a base pressure of about 10 -8 Torr to provide a clean environment for plasma formation. In addition, the pumping speed should meet the requirements during the discharge cleaning cycle. The design of the vacuum pumping system including layout and location and structure of the vacuum ports required for pumping and diagnostic access is presented. Two different types of pumping systems - turbomolecular pumps and cryrogenic pumps have been considered. The advantages and disadvantages of each type of pumping system are analyzed

  20. A new gas stripper system for BARC-TIFR Pelletron Accelerator facility: installation and preliminary results

    International Nuclear Information System (INIS)

    Sharma, S.C.; Ninawe, N.G.; Yadav, M.L.; Ekambaram, M.; Ramjilal; Matkar, U.V.; Ansari, Q.N.; Lokare, R.N.; Ramlal; Gupta, A.K.; Bhagwat, P.V.; Pillay, R.G.

    2009-01-01

    The gas-stripper plays a key role in stripping the heavy and molecular ion beams in a tandem accelerator. Efficiency of gas stripper depends on its supporting vacuum pumps. A new recirculating turbo molecular pump-based gas stripper has been installed in the high voltage terminal of Pelletron Accelerator. Re-circulating the stripper gas reduces the flow of gas into the accelerating tubes reducing the transmission losses. Preliminary results obtained using the new gas stripper system are discussed. (author)

  1. Turbomolecular pump vacuum system for the Princeton Large Torus

    International Nuclear Information System (INIS)

    Dylla, H.F.

    1977-10-01

    A turbomolecular pump vacuum system has been designed and installed on the Princeton Large Torus (PLT). Four vertical shaft, oil-bearing, 1500 l/s turbomolecular pumps have been interfaced to the 6400 liter PLT Vacuum vessel to provide a net pumping speed of 3000 l/s for H 2 . The particular requirements and problems of tokamak vacuum systems are enumerated. A vacuum control system is described which protects the vacuum vessel from contamination, and protects the turbomolecular pumps from damage under a variety of possible failure modes. The performance of the vacuum system is presented in terms of pumping speed measurements and residual gas behavior

  2. STUXNET and the Impact on Accelerator Control Systems

    CERN Document Server

    Lüders, S

    2011-01-01

    2010 has seen wide news coverage of a new kind of computer attack, named "Stuxnet", targeting control systems. Due to its level of sophistication, it is widely acknowledged that this attack marks the very first case of a cyber-war of one country against the industrial infrastructure of another, although there is still much speculation about the details. Worse yet, experts recognize that Stuxnet might just be the beginning and that similar attacks, eventually with much less sophistication, but with much more collateral damage, can be expected in the years to come. Stuxnet was targeting a special model of the Siemens 400 PLC series. Similar modules are also deployed for accelerator controls like the LHC cryogenics or vacuum systems as well as the detector control systems in LHC experiments. Therefore, the aim of this presentation is to give an insight into what this new attack does and why it is deemed to be special. In particular, the potential impact on accelerator and experiment control sys...

  3. Spent nuclear fuel project cold vacuum drying facility vacuum and purge system design description

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1998-11-30

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Vacuum and Purge System (VPS) . The SDD was developed in conjunction with HNF-SD-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-002, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the VPS equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  4. Spent nuclear fuel project cold vacuum drying facility vacuum and purge system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Vacuum and Purge System (VPS) . The SDD was developed in conjunction with HNF-SD-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-002, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the VPS equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  5. High Field Studies for CLIC Accelerating Structures Development

    CERN Document Server

    Profatilova, I

    2017-01-01

    Compact Linear Collider RF structures need to be able to achieve the very high average accelerating gradient of 100 MV/m. One of the main challenges in reaching such high accelerating gradients is to avoid vacuum electrical breakdown within CLIC accelerating structures. Accelerating structure tests are carried out in the klystron-based test stands known as the XBoxes. In order to investigate vacuum breakdown phenomena and its statistical characteristics in a simpler system and get results in a faster way, pulsed dc systems have been developed at CERN. To acquire sufficient breakdown data in a reasonable period of time, high repetition rate pulse generators are used in the systems for breakdown studies, so-called pulsed dc system. This paper describes the pulsed dc systems and the two high repetition rate circuits, which produce high-voltage pulses for it, available at CERN.

  6. Data logging system upgrade for Indus accelerator

    International Nuclear Information System (INIS)

    Mishra, R.; Merh, B.N.; Agrawal, R.K.; Fatnani, P.; Navathe, C.P.; Pal, S.

    2012-01-01

    An accelerator has various subsystems like Magnet Power Supply, Beam Diagnostics and Vacuum etc. which are required to work in a stable manner to ensure required machine performance. Logging of system parameters at a faster rate plays a crucial role in analysing and understanding machine behaviour. Logging all the machine parameters consistently at the rate of typically more than 1 Hz has been the aim of a recent data logging system upgrade. Nearly ten thousand parameters are being logged at varying intervals of one second to one minute in Indus accelerator complex. The present logging scheme is augmented to log all these parameters at a rate equal to or more than 1 Hz. The database schema is designed according to the data type of the parameter. The data is distributed into historical table and intermediate table which comprises of recent data. Machine control applications read the parameter values from the control system and store them into the text files of finite time duration for each sub-system. The logging application of each sub-system passes these text files to database for bulk insertion. The detail design of database, logging scheme and its architecture is presented in the paper. (author)

  7. Comparison of vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification systems.

    Science.gov (United States)

    Han, Young Keun; Miller, Kevin M

    2009-08-01

    To compare vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification machines. Jules Stein Eye Institute and Department of Ophthalmology, David Geffen School of Medicine at UCLA, Los Angeles, California, USA. The vacuum rise time under normal and enhanced aspiration modes, vacuum limit accuracy, and occlusion break surge of the Infiniti Vision System, Stellaris Vision Enhancement System, and WhiteStar Signature Phacoemulsification System were tested. Vacuum rise time and limit accuracy were measured at limit settings of 400 mm Hg and 600 mm Hg. Surge area was recorded at vacuum limit settings of 200 mm Hg, 300 mm Hg, 400 mm Hg, and 500 mm Hg. The Infiniti had the fastest vacuum rise times under normal and enhanced aspiration modes. At 4 seconds, the vacuum limit accuracy was greatest with the Infiniti at the 400 mm Hg limit and the Signature at the 600 mm Hg limit. The Stellaris did not reach either vacuum target. The Infiniti performed better than the other 2 machines during testing of occlusion break surge at all vacuum limit settings above 200 mm Hg. Under controlled laboratory test conditions, the Infiniti had the fastest vacuum rise time, greatest vacuum limit accuracy at 400 mm Hg, and least occlusion break surge. These results can be explained by the lower compliance of the Infiniti system.

  8. HIGH PRODUCTIVITY VACUUM BLASTING SYSTEM

    International Nuclear Information System (INIS)

    McPhee, William S.

    1999-01-01

    The objective of this project is to improve the productivity and lower the expense of existing vacuum blasting technology. This technology is used to remove radioactive contamination, PCBs, and lead-based paint and provides worker protection by continuously recycling the material and dust for the decontamination tasks. The proposed work would increase the cleaning rate and provide safe and cost-effective decontamination of the DOE sites. This work focuses on redesigning and improving existing vacuum blasting technology including blast head nozzles, ergonomic handling of the blast head by reducing its weight; brush-ring design, vacuum level regulator, efficiency of the dust separator, and operational control sensors. The redesign is expected to enhance the productivity and economy of the vacuum blasting system by at least 50% over current vacuum blasting systems. There are three phases in the project. Phase I consists of developing and testing mathematical models. Phase II consists of pre-prototype design and fabrication and pre-prototype unit testing. Phase III consists of prototype design and field verification testing. In phase I, mathematical models are developed and analyzed for the nozzle, blast head, wind curtain, and dust separator, first as individual devices and then combined as an integrated model. This allows study of respective airflow and design parameters. The Contractor shall, based on the results of the mathematical modeling studies, design experimental models of the components and test these models. In addition, the Contractor shall develop sensors to detect the relationship of the blast head to the blast surfaces and controls to minimize the dependency on an operator's skill and judgment to obtain optimum positioning, as well as real-time characterization sensors to determine as the blast head is moving the depth to which coatings must be removed, thereby improving production and minimizing waste. In phase II, the Contractor shall design and

  9. Vacuum system of SST-1 Tokamak

    International Nuclear Information System (INIS)

    Khan, Ziauddin; Pathan, Firozkhan; George, Siju; Semwal, Pratibha; Dhanani, Kalpesh; Paravastu, Yuvakiran; Thankey, Prashant; Ramesh, Gattu; Himabindu, Manthena; Pradhan, Subrata

    2013-01-01

    Highlights: ► Air leaks developed during ongoing SST-1 cooldown campaign were detected online using RGA. ► The presence of N 2 and O 2 gases with the ratio of their partial pressures with ∼3.81:1 confirmed the air leaks. ► Baking of SST-1 was done efficiently by flowing hot N 2 gas in C-channels welded on inner surfaces without any problem. ► In-house fabricated demountable bull nose couplers were demonstrated for high temperature and pressure applications. ► Cryopumping effect was observed when liquid helium cooled superconducting magnets reached below 63 K. -- Abstract: Vacuum chambers of Steady State Superconducting (SST-1) Tokamak comprises of the vacuum vessel and the cryostat. The plasma will be confined inside the vacuum vessel while the cryostat houses the superconducting magnet systems (TF and PF coils), LN 2 cooled thermal shields and hydraulics for these circuits. The vacuum vessel is an ultra-high (UHV) vacuum chamber while the cryostat is a high-vacuum (HV) chamber. In order to achieve UHV inside the vacuum vessel, it would be baked at 150 °C for longer duration. For this purpose, U-shaped baking channels are welded inside the vacuum vessel. The baking will be carried out by flowing hot nitrogen gas through these channels at 250 °C at 4.5 bar gauge pressure. During plasma operation, the pressure inside the vacuum vessel will be raised between 1.0 × 10 −4 mbar and 1.0 × 10 −5 mbar using piezoelectric valves and control system. An ultimate pressure of 4.78 × 10 −6 mbar is achieved inside the vacuum vessel after 100 h of pumping. The limitation is due to the development of few leaks of the order of 10 −5 mbar l/s at the critical locations of the vacuum vessel during baking which was confirmed with the presence of nitrogen gas and oxygen gas with the ratio of ∼3.81:1 indicating air leak. Similarly an ultimate vacuum of 2.24 × 10 −5 mbar is achieved inside the cryostat. Baking of the vacuum vessel up to 110 °C with ±10

  10. Past, Present and Future of Linac 2 Vacuum System

    CERN Document Server

    Mahner, E

    2011-01-01

    This note aims to review the past, present, and future operation of CERN's Linac 2 vacuum system. The machine vacuum system layout with its major components is summarized. Operational problems arising in 2006 yielded to a leak test campaign of the whole machine, which detected a new, major leak on tank 3. Details about the mitigation of this leak are described as well as additional diagnostics installed during shutdown 2006/07. The pressure evolution of the most critical vacuum sector is analyzed. A statistics of vacuum system faults observed since 2000 is presented and compared with other systems. Finally, a perspective for the vacuum system operation until 2017/18 is outlined.

  11. Accelerating tube for the ''EG-1'' electrostatic accelerator

    International Nuclear Information System (INIS)

    Romanov, V.A.; Ivanov, V.V.; Krupnov, E.P.; Debin, V.K.; Dudkin, N.I.; Volodin, V.I.

    1980-01-01

    A design of an accelerating tube (AT) for an electrostatic accelerator of the EG-1 type is described. Primary consideration in the development of the AT has been given to increasing the electric strength of accelerating gaps, the vacuum conductivity and better insulator screening from charged particles. After AT vacuum and high-voltage ageing in the accelerator, a hydrogen ions beam of up to 80 μA has been produced. The beam was adequately shaped in the energy range from 1.8 to 5.0 MeV [ru

  12. Electron emission of cathode holder of vacuum diode of an intense electron-beam accelerator and its effect on the output voltage

    OpenAIRE

    Xin-Bing Cheng; Jin-Liang Liu; Hong-Bo Zhang; Zhi-Qiang Hong; Bao-Liang Qian

    2011-01-01

    The vacuum diode which is used to generate relativistic electron beams is one of the most important parts of a pulsed-power modulator. In this paper, the electron emission of cathode holder of a vacuum diode and its effect on the output voltage is investigated by experiments on an intense electron-beam accelerator with 180 ns full width at half maximum and 200–500 kV output voltage. First, the field emission is analyzed and the electric field of the vacuum chamber is calculated. Then, the fla...

  13. Characteristics of the ISABELLE vacuum system

    International Nuclear Information System (INIS)

    Aggus, J.R.; Edwards, D. Jr.; Halama, H.J.; Herrera, J.C.

    1977-01-01

    A discussion is given of the complete vacuum system of ISABELLE, emphasizing those design characteristics dictated by high vacuum, the avoidance of beam current loss, and the reduction of background. The experimental and theoretical justifications for the design are presented

  14. Electrodeless plasma acceleration system using rotating magnetic field method

    Directory of Open Access Journals (Sweden)

    T. Furukawa

    2017-11-01

    Full Text Available We have proposed Rotating Magnetic Field (RMF acceleration method as one of electrodeless plasma accelerations. In our experimental scheme, plasma generated by an rf (radio frequency antenna, is accelerated by RMF antennas, which consist of two-pair, opposed, facing coils, and these antennas are outside of a discharge tube. Therefore, there is no wear of electrodes, degrading the propulsion performance. Here, we will introduce our RMF acceleration system developed, including the experimental device, e.g., external antennas, a tapered quartz tube, a vacuum chamber, external magnets, and a pumping system. In addition, we can change RMF operation parameters (RMF applied current IRMF and RMF current phase difference ϕ, focusing on RMF current frequency fRMF by adjusting matching conditions of RMF, and investigate the dependencies on plasma parameters (electron density ne and ion velocity vi; e.g., higher increases of ne and vi (∼360 % and 55 %, respectively than previous experimental results were obtained by decreasing fRMF from 5 MHz to 0.7 MHz, whose RMF penetration condition was better according to Milroy’s expression. Moreover, time-varying component of RMF has been measured directly to survey the penetration condition experimentally.

  15. Vacuum system of SST-1 Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Ziauddin, E-mail: ziauddin@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar 382 428 (India); Pathan, Firozkhan; George, Siju; Semwal, Pratibha; Dhanani, Kalpesh; Paravastu, Yuvakiran; Thankey, Prashant; Ramesh, Gattu; Himabindu, Manthena; Pradhan, Subrata [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar 382 428 (India)

    2013-10-15

    Highlights: ► Air leaks developed during ongoing SST-1 cooldown campaign were detected online using RGA. ► The presence of N{sub 2} and O{sub 2} gases with the ratio of their partial pressures with ∼3.81:1 confirmed the air leaks. ► Baking of SST-1 was done efficiently by flowing hot N{sub 2} gas in C-channels welded on inner surfaces without any problem. ► In-house fabricated demountable bull nose couplers were demonstrated for high temperature and pressure applications. ► Cryopumping effect was observed when liquid helium cooled superconducting magnets reached below 63 K. -- Abstract: Vacuum chambers of Steady State Superconducting (SST-1) Tokamak comprises of the vacuum vessel and the cryostat. The plasma will be confined inside the vacuum vessel while the cryostat houses the superconducting magnet systems (TF and PF coils), LN{sub 2} cooled thermal shields and hydraulics for these circuits. The vacuum vessel is an ultra-high (UHV) vacuum chamber while the cryostat is a high-vacuum (HV) chamber. In order to achieve UHV inside the vacuum vessel, it would be baked at 150 °C for longer duration. For this purpose, U-shaped baking channels are welded inside the vacuum vessel. The baking will be carried out by flowing hot nitrogen gas through these channels at 250 °C at 4.5 bar gauge pressure. During plasma operation, the pressure inside the vacuum vessel will be raised between 1.0 × 10{sup −4} mbar and 1.0 × 10{sup −5} mbar using piezoelectric valves and control system. An ultimate pressure of 4.78 × 10{sup −6} mbar is achieved inside the vacuum vessel after 100 h of pumping. The limitation is due to the development of few leaks of the order of 10{sup −5} mbar l/s at the critical locations of the vacuum vessel during baking which was confirmed with the presence of nitrogen gas and oxygen gas with the ratio of ∼3.81:1 indicating air leak. Similarly an ultimate vacuum of 2.24 × 10{sup −5} mbar is achieved inside the cryostat. Baking of the

  16. Prototype rf cavity for the HISTRAP accelerator

    International Nuclear Information System (INIS)

    Mosko, S.W.; Dowling, D.T.; Olsen, D.K.

    1989-01-01

    HISTRAP, a proposed synchrotron-cooling-storage ring designed to both accelerate and decelerate very highly charged very heavy ions for atomic physics research, requires an rf accelerating system to provide /+-/2.5 kV of peak accelerating voltage per turn while tuning through a 13.5:1 frequency range in a fraction of a second. A prototype half-wave, single gap rf cavity with biased ferrite tuning was built and tested over a continuous tuning range of 200 kHz through 2.7 MHz. Initial test results establish the feasibility of using ferrite tuning at the required rf power levels. The resonant system is located entirely outside of the accelerator's 15cm ID beam line vacuum enclosure except for a single rf window which serves as an accelerating gap. Physical separation of the cavity and the beam line permits in situ vacuum baking of the beam line at 300/degree/C

  17. Troubleshooting vacuum systems steam turbine surface condensers and refinery vacuum towers

    CERN Document Server

    Lieberman, Norman P

    2012-01-01

    Vacuum systems are in wide spread use in the petrochemical plants, petroleum refineries and power generation plants. The existing texts on this subject are theoretical in nature and only deal with how the equipment functions when in good mechanical conditions, from the viewpoint of the equipment vendor.  In this much-anticipated volume, one of the most well-respected and prolific process engineers in the world takes on troubleshooting vacuum systems, and especially steam ejectors, an extremely complex and difficult subject that greatly effects the profitability of the majority of the world'

  18. Wireless Integrated Microelectronic Vacuum Sensor System

    Science.gov (United States)

    Krug, Eric; Philpot, Brian; Trott, Aaron; Lawrence, Shaun

    2013-01-01

    NASA Stennis Space Center's (SSC's) large rocket engine test facility requires the use of liquid propellants, including the use of cryogenic fluids like liquid hydrogen as fuel, and liquid oxygen as an oxidizer (gases which have been liquefied at very low temperatures). These fluids require special handling, storage, and transfer technology. The biggest problem associated with transferring cryogenic liquids is product loss due to heat transfer. Vacuum jacketed piping is specifically designed to maintain high thermal efficiency so that cryogenic liquids can be transferred with minimal heat transfer. A vacuum jacketed pipe is essentially two pipes in one. There is an inner carrier pipe, in which the cryogenic liquid is actually transferred, and an outer jacket pipe that supports and seals the vacuum insulation, forming the "vacuum jacket." The integrity of the vacuum jacketed transmission lines that transfer the cryogenic fluid from delivery barges to the test stand must be maintained prior to and during engine testing. To monitor the vacuum in these vacuum jacketed transmission lines, vacuum gauge readings are used. At SSC, vacuum gauge measurements are done on a manual rotation basis with two technicians, each using a handheld instrument. Manual collection of vacuum data is labor intensive and uses valuable personnel time. Additionally, there are times when personnel cannot collect the data in a timely fashion (i.e., when a leak is detected, measurements must be taken more often). Additionally, distribution of this data to all interested parties can be cumbersome. To simplify the vacuum-gauge data collection process, automate the data collection, and decrease the labor costs associated with acquiring these measurements, an automated system that monitors the existing gauges was developed by Invocon, Inc. For this project, Invocon developed a Wireless Integrated Microelectronic Vacuum Sensor System (WIMVSS) that provides the ability to gather vacuum

  19. Re-circulating linac vacuum system

    International Nuclear Information System (INIS)

    Wells, Russell P.; Corlett, John N.; Zholents, Alexander A.

    2003-01-01

    The vacuum system for a proposed 2.5 GeV, 10ΜA recirculating linac synchrotron light source [1] is readily achievable with conventional vacuum hardware and established fabrication processes. Some of the difficult technical challenges associated with synchrotron light source storage rings are sidestepped by the relatively low beam current and short beam lifetime requirements of a re-circulating linac. This minimal lifetime requirement leads directly to relatively high limits on the background gas pressure through much of the facility. The 10ΜA average beam current produces very little synchrotron radiation induced gas desorption and thus the need for an ante-chamber in the vacuum chamber is eliminated. In the arc bend magnets, and the insertion devices, the vacuum chamber dimensions can be selected to balance the coherent synchrotron radiation and resistive wall wakefield effects, while maintaining the modest limits on the gas pressure and minimal outgassing

  20. Vacuum system transient simulator and its application to TFTR

    International Nuclear Information System (INIS)

    Sredniawski, J.

    1978-01-01

    The vacuum system transient simulator (VSTS) models transient gas transport throughout complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. VSTS is capable of treating gas models of up to 10 species, for all flow regimes from pure molecular to continuum. Viscous interactions between species are considered as well as non-uniform temperature of a system. Although this program was specifically developed for use on the Tokamak Fusion Test Reactor (TFTR) project at Princeton, it is a generalized tool capable of handling a broad range of vacuum system problems. During the TFTR engineering design phase, VSTS has been used in many applications. Two applications selected for presentation are: (1) torus vacuum pumping system performance between 400 Ci tritium pulses and (2) tritium backstreaming to neutral beams during pulses

  1. Vacuum system transient simulator and its application to TFTR

    International Nuclear Information System (INIS)

    Sredniawski, J.

    1977-01-01

    The vacuum system transient simulator (VSTS) models transient gas transport throughout complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. VSTS is capable of treating gas models of up to 10 species, for all flow regimes from pure molecular to continuum. Viscous interactions between species are considered as well as non-uniform temperature of a system. Although this program was specifically developed for use on the Tokamak Fusion Test Reactor (TFTR) project at Princeton, it is a generalized tool capable of handling a broad range of vacuum system problems. During the TFTR engineering design phase, VSTS has been used in many applications. Two applications selected for presentation are: torus vacuum pumping system performance between 400 Ci tritium pulses and tritium backstreaming to neutral beams during pulses

  2. Cold Vacuum Drying Instrument Air System Design Description. System 12

    International Nuclear Information System (INIS)

    SHAPLEY, B.J.; TRAN, Y.S.

    2000-01-01

    This system design description (SDD) addresses the instrument air (IA) system of the spent nuclear fuel (SNF). This IA system provides instrument quality air to the Cold Vacuum Drying (CVD) Facility. The IA system is a general service system that supports the operation of the heating, ventilation, and air conditioning (HVAC) system, the process equipment skids, and process instruments in the CVD Facility. The following discussion is limited to the compressor, dryer, piping, and valving that provide the IA as shown in Drawings H-1-82222, Cold Vacuum Drying Facility Mechanical Utilities Compressed and Instrument Air PandID, and H-1.82161, Cold Vacuum Drying Facility Process Equipment Skid PandID MCO/Cusk Interface. Figure 1-1 shows the physical location of the 1A system in the CVD Facility

  3. ISR vacuum system

    CERN Multimedia

    CERN PhotoLab

    1970-01-01

    A pressure of 5 x 10-11 Torr has been obtained repreatedly in this pilot section of the ISR vacuum system. The pilot section is 45 m long is pumped by 9 sputter-ion pumps pf 350 l/s pumping speed, and is baked out at 200 degrees C before each pump down.

  4. Design and construction of vacuum control system on EAST

    International Nuclear Information System (INIS)

    Wang, L.; Zhang, Y.; Hu, Q.S.; Wang, X.M.; Zhang, X.D.; Hu, J.S.; Yang, Y.; Gu, X.M.

    2008-01-01

    The construction of experimental advanced superconducting tokamak (EAST) was finished at the end of 2006 in Hefei, China. Its vacuum system, an important subsystem, has been commissioned in February 2006. The design and construction of this vacuum control system are described in this paper. The requirements for remote automation, distributed control and centralized management, high reliability and expansibility have been taken into account in the design. There are three levels of control in vacuum control system. The bottom level control is performed on the local instruments manually; the medium level control is based on Siemens S7-400 PLC; the top level control is conducted on IPCs with communication through profi b us network. In addition remote handling and centralized monitoring could be realized by a remote control server. The control system could achieve pumping and fueling of the whole vacuum system. Besides that, it also includes the data acquisition of the pressure and temperature. The details are discussed on the monitoring of vacuum system states including cooling water, power and compressed air, etc., safeguards of plasma chamber and cryostat chamber and vacuum equipments, choosing of control modes corresponding to the plasma discharge and wall conditioning. At the end, the parts of EAST device protection system related to vacuum and gas injection system will also be introduced

  5. Characteristics of electron gun used in the accelerator for customs inspection systems

    International Nuclear Information System (INIS)

    Huang Weiling; Li Quanfeng; Zhang Yunkai

    2001-01-01

    The author introduces the characteristics of the electron gun used in the 9 MeV traveling wave electron linear accelerator for fixed customs container inspection system. With the scan date cathode, the electron gun meets the accelerator characteristics with the whole system not needing high-temperature roasting to degas. The electron gun can work normally at a vacuum of about 10 -5 Pa and can be reinstalled after exposure to air. In the accelerator, the electron gun emits a beam which strikes the target to produce an X-ray beam with a dosage rate of over 30 Gy/(min·m) and a beam focus spot of less than φ 2 mm. The EGUN code is used to simulate the structure and properties of the electron gun. The reference size debugging parameters for replacing the electron gun are given for assembly requirements

  6. A 7MeV S-Band 2998MHz Variable Pulse Length Linear Accelerator System

    CERN Document Server

    Hernandez, Michael; Mishin, Andrey V; Saverskiy, Aleksandr J; Skowbo, Dave; Smith, Richard

    2005-01-01

    American Science and Engineering High Energy Systems Division (AS&E HESD) has designed and commissioned a variable pulse length 7 MeV electron accelerator system. The system is capable of delivering a 7 MeV electron beam with a pulse length of 10 nS FWHM and a peak current of 1 ampere. The system can also produce electron pulses with lengths of 20, 50, 100, 200, 400 nS and 3 uS FWHM with corresponding lower peak currents. The accelerator system consists of a gridded electron gun, focusing coil, an electrostatic deflector system, Helmholtz coils, a standing wave side coupled S-band linac, a 2.6 MW peak power magnetron, an RF circulator, a fast toroid, vacuum system and a PLC/PC control system. The system has been operated at repetition rates up to 250pps. The design, simulations and experimental results from the accelerator system are presented in this paper.

  7. Acquisition of reliable vacuum hardware for large accelerator systems

    International Nuclear Information System (INIS)

    Welch, K.M.

    1995-01-01

    Credible and effective communications prove to be the major challenge in the acquisition of reliable vacuum hardware. Technical competence is necessary but not sufficient. The authors must effectively communicate with management, sponsoring agencies, project organizations, service groups, staff and with vendors. Most of Deming's 14 quality assurance tenants relate to creating an enlightened environment of good communications. All projects progress along six distinct, closely coupled, dynamic phases. All six phases are in a state of perpetual change. These phases and their elements are discussed, with emphasis given to the acquisition phase and its related vocabulary. Large projects require great clarity and rigor as poor communications can be costly. For rigor to be cost effective, it can't be pedantic. Clarity thrives best in a low-risk, team environment

  8. PC driven integrated vacuum system

    International Nuclear Information System (INIS)

    Curuia, Marian; Culcer, Mihai; Brandea, Iulian; Anghel, Mihai

    2001-01-01

    The monitoring of industrial plants by virtual instrumentation represents the most modern trend in the domain of electronic equipment. The integrated vacuum system presented here has several facilities, including the automated data storing of measurement results on hard disk and providing warning messages for operators when the measured parameters are lower or higher upper than the fixed values. The system can also work stand-alone, receiving the commands from the keyboards placed on his front panel but, when it is included in a automation complex system, a remote control from PC is necessary . Both parts of the system, power supply unit for turbo-molecular pump and the vacuum gage, are controlled by an 80C31 microcontroller. Because this microcontroller has a built-in circuitry for a serial communication, we established a serial communication between the PC and the power supply unit for turbo-molecular pump and the vacuum gage, according to the RS-232 hardware standard. As software, after careful evaluation of several options, we chose to develop a hybrid software packing using two different software development tools: LabVIEW, and assembly language. We chose LabVIEW because it is dedicated to data acquisition and communications, containing libraries for data collection, analysis, display and storage. (authors)

  9. Modification in existing SF6 gas handling system at 14UD BARC-TIFR Pelletron Accelerator, Mumbai

    International Nuclear Information System (INIS)

    Ninawe, N.G.; Gupta, S.K.; Ramjilal; Sparrow, Hillary; Sharma, S.C.; Bhagwat, P.V.; Salvi, S.B.

    2003-01-01

    BARC-TIFR 14 UD Pelletron Accelerator facility at TIFR, Mumbai is operational since inception 1989. The accelerator is housed inside a pressure vessel of 6 metre diameter, 25 metre long and 525m 3 volume. The accelerator tank is pressurized with SF 6 at 80 to 100 psig in order to achieve 14MV. The inventory of SF 6 gas is about 18,000 Kg (approximately) at 80 psig. SF 6 gas can be transported from Accelerator tank to storage tank using gas handling system, which consists of oil free compressor, vacuum pump, dust filters, oil filters, dryers etc

  10. The vacuum interlock system for the CELSIUS ring

    International Nuclear Information System (INIS)

    Gajewski, K.

    1990-01-01

    A vacuum interlock system has been designed and built for the CELSIUS storage ring. The ultrahigh-vacuum system of CELSIUS has a design pressure of 10 -11 mbar. This is achieved by using vacuum-fired stainless-steel chambers, baking the whole ring to 300degC and running some 50 sputter ion and titanium sublimation pumps. The turbopumps, combined with roughing pumps, are used during the pump-down and the bake-out. The pressure is monitored by Penning vacuum gauges. There is a number of programmable pressure thresholds set to trigger various events (like closing the sector valves, disabling the bake-out, etc.). The interlock system is based on the Mitsubishi programmable logic controller (PLC). An IBM PC is used as an operator's console. The operation and performance of the system is described. On the basis of present experience an upgrading of the system is suggested. (orig.)

  11. ISR vacuum system

    CERN Multimedia

    CERN PhotoLab

    1971-01-01

    Some of the most important components of the vacuum system are shown. At the left, the rectangular box is a sputter-ion pump inside its bake-out oven. The assembly in the centre includes a sector valve, three roughing valves, a turbomolecular pump, a rotary backing pump and auxiliary equipment. At the right, the small elbow houses a Bayard-

  12. Optimal application of the Contura multilumen balloon breast brachytherapy catheter vacuum port to deliver accelerated partial breast irradiation.

    Science.gov (United States)

    Tokita, Kenneth M; Cuttino, Laurie W; Vicini, Frank A; Arthur, Douglas W; Todor, Dorin A; Julian, Thomas B; Lyden, Maureen R

    2011-01-01

    The impact of using the Contura multilumen balloon (MLB) (SenoRx, Inc., Irvine, CA) breast brachytherapy catheter's vacuum port in patients treated with accelerated partial breast irradiation (APBI) was analyzed. Data from 32 patients at two sites were reviewed. Variables analyzed included the seroma fluid (SF):air volume around the MLB before and after vacuum port use and on its ability to improve (1) the eligibility of patients for APBI and (2) dose coverage of the planning target volume for evaluation (PTV_EVAL) in eligible patients. The median SF/air volume before vacuum removal was 6.8 cc vs. 0.8 cc after vacuum removal (median reduction in SF/air volume was 90.5%). Before vacuum port use, the median SF/air volume expressed as percentage of the PTV_EVAL was 7.8% (range, 1.9-26.6) in all patients. After application of the vacuum, this was reduced to 1.2%. Before vacuum port use, 10 (31.3%) patients were not considered acceptable candidates for APBI because the SF/air volume:PTV_EVAL ratio (SF:PTV) was greater than 10% (range, 10.1-26.6%; median, 15.2%). After vacuum port use, the median SF:PTV ratio was 1.6% for a median reduction of 91.5%. In addition, the percentage of the prescribed dose covering greater than or equal to 90% of the PTV_EVAL proportionally increased a median of 8% (range, 3-10%) in eligible patients. Use of the Contura MLB vacuum port significantly improved the conformity of the target tissue to the balloon surface, leading to reproducible dose delivery and increased target volume coverage. In addition, application of the vacuum allowed the safe treatment of unacceptable patients with APBI. Copyright © 2011 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  13. Shape Memory Alloy connectors for Ultra High Vacuum applications: a breakthrough for accelerator technologies

    CERN Document Server

    AUTHOR|(CDS)2091326; Garion, Cedric

    Beam-pipe coupling in particle accelerators is nowadays provided by metallic flanges that are tightly connected by several screws or heavy collars. Their installation and dismounting in radioactive areas contribute to the radiation doses received by the technical personnel. Owing to the increased proton-beam intensity and luminosity of the future High-Luminosity LHC (HL-LHC), radioactivity in some specific zones will be significantly higher than in the present LHC; the presence of the technical staff in these areas will be strictly controlled and minimized. Remote interventions are being considered, too. Shape Memory Alloys (SMAs) offer a unique possibility to generate tight connections and fast clamping/unclamping by remotely changing the temperature of the junction unit. In fact, SMAs exhibit unique strain and stress recovery capabilities which are related to reversible phase transition mechanisms, induced thermally or mechanically. In this PhD work, a novel Ultra-High Vacuum (UHV) coupling system based on ...

  14. Stuxnet and the impact on accelerator control systems

    International Nuclear Information System (INIS)

    Lueders, S.

    2012-01-01

    2010 has seen wide news coverage of a new kind of computer attack, named 'Stuxnet', targeting control systems. Due to its level of sophistication, it is widely acknowledged that this attack marks the very first case of a cyber-war of one country against the industrial infrastructure of another, although there is still much speculation about the details. Worse yet, experts recognize that Stuxnet might just be the beginning and that similar attacks, eventually with much less sophistication, but with much more collateral damage, can be expected in the years to come. Stuxnet was targeting a special model of the Siemens 400 PLC series. Similar modules are also deployed for accelerator controls like the LHC cryogenics or vacuum systems as well as the detector control systems in LHC experiments. Therefore, the aim of this presentation is to give an insight into what this new attack does and why it is deemed to be special. In particular, the potential impact on accelerator and experiment control systems will be discussed, and means will be presented on how to properly protect against similar attacks. Deploying a 'Defense-in-depth' approach appears to be mandatory. (author)

  15. Bake-Out Mobile Controls for Large Vacuum Systems

    CERN Document Server

    Blanchard, S; Gomes, P; Pereira, H; Kopylov, L; Merker, S; Mikheev, M

    2014-01-01

    Large vacuum systems at CERN (Large Hadron Collider - LHC, Low Energy Ion Rings - LEIR...) require bake-out to achieve ultra-high vacuum specifications. The bake-out cycle is used to decrease the outgassing rate of the vacuum vessel and to activate the Non-Evaporable Getter (NEG) thin film. Bake-out control is a Proportional-Integral-Derivative (PID) regulation with complex recipes, interlocks and troubleshooting management and remote control. It is based on mobile Programmable Logic Controller (PLC) cabinets, fieldbus network and Supervisory Control and Data Acquisition (SCADA) application. The CERN vacuum installations include more than 7 km of baked vessels; using mobile cabinets reduces considerably the cost of the control system. The cabinets are installed close to the vacuum vessels during the time of the bake-out cycle. Mobile cabinets can be used in any of the CERN vacuum facilities. Remote control is provided through a fieldbus network and a SCADA application

  16. Development of a large lithium coolant system for operation under vacuum

    International Nuclear Information System (INIS)

    Kolowith, R.; Schwartz, K.E.; Meadows, G.E.; Berg, J.D.

    1983-11-01

    Argon and vacuum systems for the Experimental Lithium System (ELS) were tested to demonstrate vacuum-break capability, vacuum pumping performance, and vacuum sensor compatibility with a hostile liquid metal vapor/aerosol environment. Mechanical, diffusion and cryogenic vacuum pumps were evaluated. High-vacuum levels in the 10 -3 Pa range were achieved over a 270 0 C flowing lithium system. Ionization, thermal conductivity, capacitance manometer, and compound-type pressure sensors were evaluated to determine the effects of this potentially deleterious environment. Screening elbows were evaluated as pressure sensor protective devices. A dual-purpose vacuum-level/nitrogen partial-pressure sensor was evaluated as a means of detecting air in-leakage. Several types of static mechanical vacuum seals were also evaluated. Measurements of the vapor/aerosol generation were made at several system locations and operating conditions

  17. The vacuum interlock system for the PETRA III beamlines

    Energy Technology Data Exchange (ETDEWEB)

    Degenhardt, Markus; Hahn, Ulrich; Hesse, Mathias; Schulte-Schrepping, Horst [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany)

    2008-07-01

    The storage ring PETRA at DESY in Hamburg is being reconstructed into the third generation source for synchrotron radiation, PETRA III. The up to 100 m long beamlines are large UHV-systems that guide the synchrotron radiation from the storage ring to the experiments. Each beamline will be equipped with a vacuum interlock system to ensure the safe operation of the vacuum components. In particular the task of the vacuum interlock is to prevent faulty operations that can cause a ventilation of the vacuum system or a damage of vacuum components by the high power synchrotron radiation beam. The interlock system will be implemented as a PLC that is connected to a distributed input/output layer via a field bus system. As a specialty, the PLC will be realised as a soft-PLC running on a PC with a real time windows operating system. Another specialty is the visualisation and remote control of the vacuum interlock system by means of a website. At the beamline the interlock will be operated via a touch panel that displays the visualisation website. Additionally, the interlock can be remotely operated from any location by opening the visualisation website with a browser. The interlock is protected against unauthorised operation by a login page. All relevant interlock data will be fed into the existing network-based archive system.

  18. LHC Report: Even accelerators need a break

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    The LHC technical stop is in full swing, with a lot of essential maintenance work on the accelerator services, such as electricity distribution, cooling, ventilation, cryogenic systems, access and safety systems, vacuum, cranes and lifts, being crammed into the few weeks before the start of the 2011 run in February.   Team changing a magnet in the SPS accelerator.  In addition to the maintenance work a number of modifications are being made to the accelerator for 2011. These include the installation of small solenoids to combat the build-up of electrons inside the vacuum chamber with the increasing proton beam intensity; the replacement of a number of UPS (Uninterruptible Power Supply) installations, which are vital to ensuring the continuity of the electrical supply to essential systems such as the cryogenics; the installation of additional capacitors on the QPS (Quench Protection system) to prepare for a possible increase in beam energy in 2011; the completion of the programme to repla...

  19. Continuous vacuum processing system for quartz crystal resonators

    International Nuclear Information System (INIS)

    Ney, R.J.; Hafner, E.

    1979-01-01

    An ultrahigh vacuum continuous cycle quartz crystal fabrication facility has been developed that assures an essentially contamination-free environment throughout the final manufacturing steps of the crystal unit. The system consists of five essentially tubular vacuum chambers that are interconnected through gate valves. The unplated crystal resonators, mounted in ceramic flatback frames and loaded on carrier trays, enter the vacuum system through an entrance air lock, are UV/ozone cleaned, baked at 300 0 C, plated to frequency, thermocompression sealed, and exit as completed crystal units through an exit air lock, while the bake, plate and seal chambers remain under continuous vacuum permanently. In-line conveyor belts are used, in conjunction with balanced vacuum manipulators, to move the resonator components to the various work stations. Unique high density, highly directional nozzle beam evaporation sources, capable of long term operation without reloading, are used for electroding the resonators simultaneously on both sides. The design goal for the system is a production rate of 200 units per 8 hour day; it is adaptable to automatic operation

  20. Radiation zoning for vacuum equipment of the CERN Large Hadron Collider

    CERN Document Server

    Mahner, E; Cruikshank, P; Forkel-Wirth, D; Jiménez, J M

    2010-01-01

    Beam losses in high-energy particle accelerators are responsible for beam lifetime degradation. In the LHC beam losses will create a shower of particles while interacting with materials from the beam pipes and surroundings, resulting in a partial activation of material in the tunnel. Efforts have been made during the accelerator design to monitor and to reduce the activation induced by beam losses. Traceability for all vacuum components has been established providing a tool to follow-up individually each component or subcomponents installed in the tunnel, regardless of their future destination e.g. recycling or disposal. In the latter case, the history of vacuum components will allow calculating the beam-induced activation and permit comparisons with in-situ and ex-situ measurements. This zoning will also help to reduce collective and individual radiation doses to personnel during interventions. The paper presents the vacuum system layout and describes the LHC vacuum zoning and its implementation using an ORA...

  1. Internal motion in high vacuum systems

    Science.gov (United States)

    Frank, J. M.

    Three transfer and positioning mechanisms have been developed for the non-air exposed, multistep processing of components in vacuum chambers. The functions to be performed in all of the systems include ultraviolet/ozone cleaning, vacuum baking, deposition of thin films, and thermocompression sealing of the enclosures. Precise positioning of the components is required during the evaporation and sealing processes. The three methods of transporting and positioning the components were developed to accommodate the design criteria and goals of each individual system. The design philosophy, goals, and operation of the three mechanisms are discussed.

  2. The New Control System for the Vacuum of ISOLDE

    CERN Document Server

    Blanchard, S; Bernard, FB; Blanco, E; Gomes, P; Vestergard, H; Willeman, D

    2011-01-01

    The On-Line Isotope Mass Separator (ISOLDE) is a facility dedicated to the production of radioactive ion beams for nuclear and atomic physics. From ISOLDE vacuum sectors to the pressurized exhaust gas storage tanks there are up to five stages of pumping for a total of more than one hundred pumps including turbo-molecular, cryogenic, dry, membrane and oil pumps. The ISOLDE vacuum control system is critical; the volatile radioactive elements present in the exhaust gases and the high and ultra high vacuum pressure specifications require a complex control and interlock system. This paper describes the reengineering of the control system developed using the CERN UNICOS-CPC framework. An additional challenge has been the usage of the UNICOS-CPC in a vacuum domain for the first time. The process automation provides multiple operating modes (rough pumping, bake-out, high vacuum pumping, regeneration for cryo-pumped sectors, venting, etc). The control system is composed of local controllers driven by...

  3. Integrated vacuum extraction/pneumatic soil fracturing system for remediation of low permeability soil

    International Nuclear Information System (INIS)

    Plaines, A.L.; Piniewski, R.J.; Yarbrough, G.D.

    1994-01-01

    There is wide use of vacuum extraction to remove volatile and semi-volatile organic compounds (VOCs) from unsaturated soil. At sites with soil of low permeability, VOC extraction rates may not be sufficient to meet soil clean-up objectives within the desired time frame. During vacuum extraction in low permeability soil, the diffusion rates of VOCs through the soil matrix may limit VOC removal rates. An increase in the number of subsurface paths for advective flow through the contaminated zone results in a larger mass of contaminant being removed in a shorter time frame, accelerating site remediation. One technique for increasing the number of subsurface flow paths is Terra Vac's process of pneumatic soil fracturing (PSF). In this process, pressurized air is injected into the subsurface, creating micro-fractures for the vacuum extraction system to withdraw contaminants. Similar to hydraulic fracturing techniques long used in the petroleum industry for increasing yield from oil and gas production wells, this technique has applications for soil remediation in low permeability conditions. Two case studies, one in Louisiana at a gasoline service station and one at a manufacturing plant in New York, are presented

  4. Thermal Vacuum Integrated System Test at B-2

    Science.gov (United States)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Space Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility during pump down of the vacuum chamber, operation of the liquid nitrogen heat sink (or cold wall) and the infrared lamp array. A vacuum level of 1.3x10(exp -4)Pa (1x10(exp -6)torr) was achieved. The heat sink provided a uniform temperature environment of approximately 77 K (140deg R) along the entire inner surface of the vacuum chamber. The recently rebuilt and modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m at a chamber diameter of 6.7 m (22 ft) and along 11 m (36 ft) of the chamber s cylindrical vertical interior. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface. The data acquired matched pretest predictions and demonstrated system functionality.

  5. Technical specification for a 25 MV tandem electrostatic accelerator

    International Nuclear Information System (INIS)

    Jones, C.M.; Biggerstaff, J.A.; Blair, J.K.; Ball, J.B.; Larson, J.D.; Martin, J.A.; McConnell, J.W.; Milner, W.T.; Murray, J.A.; Ziegler, N.F.

    1975-08-01

    Specifications are given for an accelerator system to consist of a 25 MV tandem electrostatic accelerator and specified ancillary equipment, including an injector, a beam transport system, a vacuum system, a control system, and a system for storage of the insulating gas and transport of the gas to and from the accelerator. The insulating gas shall be SF 6 . The tandem electrostatic accelerator shall be vertical in orientation and of folded construction, and shall be installed in a new structure adjacent to the Oak Ridge Isochronous Cyclotron. (auth)

  6. Comment on "How the huge energy of quantum vacuum gravitates to drive the slow accelerating expansion of the Universe"

    Science.gov (United States)

    Mazzitelli, Francisco D.; Trombetta, Leonardo G.

    2018-03-01

    In a recent paper [Q. Wang, Z. Zhu, and W. G. Unruh, Phys. Rev. D 95, 103504 (2017), 10.1103/PhysRevD.95.103504] it was argued that, due to the fluctuations around its mean value, vacuum energy gravitates differently from what was previously assumed. As a consequence, the Universe would accelerate with a small Hubble expansion rate, solving the cosmological constant and dark energy problems. We point out here that the results depend on the type of cutoff used to evaluate the vacuum energy. In particular, they are not valid when one uses a covariant cutoff such that the zero-point energy density is positive definite.

  7. PC driven integrated vacuum system

    International Nuclear Information System (INIS)

    Curuia, M.; Culcer, M.; Brandea, I.; Anghel, M.

    2001-01-01

    The paper presents a integrated vacuum system which was designed and manufactured in our institute. The main parts of this system are the power supply unit for turbo-melecular pumps and the vacuummeter. Both parts of the system are driven by means of a personal computer using a serial communication, according to the RS 232 hardware standard.(author)

  8. Electron source with a carbon-fibrous cathode for radiation-technology accelerator

    International Nuclear Information System (INIS)

    Korenev, S.A.

    1994-01-01

    The paper analyses the circuit of a full operating voltage electron source which is a direct-action electron accelerator. The electron source consists of a power supply, high-voltage multiplier-rectifier, vacuum planar diode, vacuum system and control system. The vacuum electron diode contains an autoemission carbon-fibrous cathode and beryllium foil strip anode. The results of measurements of emission characteristics of alumosilicate and carbon-fibrous cathodes are presented. The investigations into test electron source show that it can be used as a basis for creating an electron accelerator which will be capable of generating 1 MW electron beams of 1-2 MeV energy and 1 A current. 3 refs., 1 fig., 1 tab

  9. Cryogenic vacuum pumping at the LBL 88-inch cyclotron

    International Nuclear Information System (INIS)

    Elo, D.; Morris, D.; Clark, D.J.; Gough, R.A.

    1978-09-01

    A cryogenic vacuum pumping panel has been in operation at the 88-inch cyclotron since 1974. The nude pumping panel is located in the acceleration chamber. The pumping surface consists of tubing cooled to 20 0 K by a closed loop helium refrigeration system. The pumping surfaces are shielded from radiation heat loads and water vapors by liquid nitrogen cooled baffles. The panel was designed for an average pumping speed of 14,000 liters/sec. for air. This approximately tripled the total effective pumping on the acceleration chamber from the existing diffusion pumped system, significantly reducing charge exchange losses of heavy ions during acceleration. Design, installation and performance characteristics are described

  10. Development of an automated system for the operation of an electron beam accelerator

    International Nuclear Information System (INIS)

    Somessari, Samir L.; Moura, João A.; Calvo, Wilson Ap. Parejo

    2017-01-01

    Electron beam accelerators are used in many applications, such as basic physical research, chemistry, medicine, molecular biology, microelectronics, agriculture and industry, among others. The majority of the accelerators have electrons from a hot tungsten filament and their energy is increased as it passes through an electric field in the vacuum chamber. For industrial purposes, the most common model is Dynamitrons®. At IPEN-CNEN/SP, there is an electron beam accelerator Dynamitron® Type (Manufactured by RDI- Radiation Dynamics Inc., 1978) model DC1500/25/4. The technology applied was available in the 60's and 70's, but, nowadays is obsolete. Moreover, there are not original spare parts for this equipment any longer. The aim of this work is to develop a nationalized automated operation system for the accelerator, to replace the old equipment. (author)

  11. Development of an automated system for the operation of an electron beam accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Somessari, Samir L.; Moura, João A.; Calvo, Wilson Ap. Parejo, E-mail: somessar@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2017-11-01

    Electron beam accelerators are used in many applications, such as basic physical research, chemistry, medicine, molecular biology, microelectronics, agriculture and industry, among others. The majority of the accelerators have electrons from a hot tungsten filament and their energy is increased as it passes through an electric field in the vacuum chamber. For industrial purposes, the most common model is Dynamitrons®. At IPEN-CNEN/SP, there is an electron beam accelerator Dynamitron® Type (Manufactured by RDI- Radiation Dynamics Inc., 1978) model DC1500/25/4. The technology applied was available in the 60's and 70's, but, nowadays is obsolete. Moreover, there are not original spare parts for this equipment any longer. The aim of this work is to develop a nationalized automated operation system for the accelerator, to replace the old equipment. (author)

  12. Test of the beam effect on vacuum arc occurrence in a high-gradient accelerating structure for the CLIC project

    CERN Document Server

    AUTHOR|(CDS)2130409; Gagliardi, Martino

    A new generation of lepton colliders capable of reaching TeV energies is pres- ently under development, and to succeed in this task it is necessary to show that the technology for such a machine is available. The Compact Linear Collider (CLIC) is a possible design option among the future lepton collider projects. It consists of two normal-conducting linacs. Accelerating structures with a gradient of the order of 100 MV/m are necessary to reach the required high energies within a reasonable machine length. One of the strictest require- ments for such accelerating structures is a relatively low occurrence of vacuum arcs. CLIC prototype structures have been tested in the past, but only in absence of beam. In order to proof the feasibility of the high gradient technology for building a functional collider, it is necessary to understand the effect of the beam presence on the vacuum breakdowns. Tests of this type have never been performed previously. The main goal of this work is to provide a first measurement of t...

  13. Vacuum Simulations in High Energy Accelerators and Distribution Properties of Continuous and Discrete Particle Motions

    OpenAIRE

    Aichinger, Ida; Larcher, Gerhard; Kersevan, Roberto

    2017-01-01

    The underlying thesis on mathematical simulation methods in application and theory is structured into three parts. The first part sets up a mathematical model capable of predicting the performance and operation of an accelerator’s vacuum system based on analytical methods. A coupled species-balance equation system describes the distribution of the gas dynamics in an ultra-high vacuum system considering impacts of conductance limitations, beam induced effects (ion-, electron-, and photon-induc...

  14. Proceedings of the national conference on vacuum electronic devices and applications: souvenir and extended abstracts

    International Nuclear Information System (INIS)

    2012-01-01

    Vacuum electronic devices have carved out a strategic niche for themselves in the areas of satellite based communications and broadcasting, industrial and medical accelerators, and, high power RF systems required in high energy particle accelerators, accelerator driven sub-critical systems, plasma heating systems in nuclear fusion reactors for power generation etc. Besides, these devices continue to have their major applications in various defence related communication, RADAR and ECM systems. Papers relevant to INIS are indexed separately

  15. Summary of the second international conference on electrostatic accelerator technology

    International Nuclear Information System (INIS)

    Wegner, H.E.

    1977-01-01

    A review is given of the history of electrostatic accelerator technology, including a technology assessment of acceleration tubes, vacuum systems, voltage gradients, charging systems, and ion sources. Improvements in the performance of electrostatic accelerators during the last four years and of those currently under construction are discussed. The improved performance has greatly expanded the heavy ion research capabilities of the entire research community

  16. Different ways of looking at the electromagnetic vacuum

    International Nuclear Information System (INIS)

    Milonni, P.W.

    1987-01-01

    Some thoughts on the electromagnetic vacuum are presented in connection with the vacuum and source fields as alternative physical bases for understanding spontaneous emission, the Lamb shift, Casimir effects, van der Waals forces, and the ''thermalization'' of vacuum fluctuations for a uniformly accelerated observer

  17. In situ conditioning for proton storage ring vacuum systems

    International Nuclear Information System (INIS)

    Blechschmidt, D.

    1978-01-01

    Average pressure and vacuum-stability limit as expected in the presence of a proton beam were measured after in situ treatments such as bakeout under various conditions, argon glow-discharge cleaning and sputter deposition of titanium. Measurements were carried out for test pipes made of stainless steel (untreated, electropolished, or cooled to 77 K), pure titanium and aluminum alloy. The measurement method used to obtain the vacuum-stability limit in the laboratory and in a prototype system is described. The results can be applied also to other systems of different geometry by use of scaling laws. In situ conditioning generally has a stronger influence on vacuum performance than a particular choice of material. Bakeout gives low average pressures and rather good vacuum stability. Glow discharges also increase the vacuum stability but have only a small effect on the static pressure. Coating the beam-pipe wall with titanium by in situ sputtering provides large linear pumping, thus a lower pressure and an extremely good vacuum stability

  18. Vacuum pulse conditioning and risetime sharpening on a low nu/gamma multi-MEV electron beam accelerator

    International Nuclear Information System (INIS)

    Stringfield, R.M.; Bartsch, R.R.; Davis, H.A.; Sherwood, E.G.

    1986-01-01

    The surface flashover switch interrupts the cathode stalk of the vacuum transmission line near the load. The flashover voltage is controlled by varying the switch length, with a maximum flashover voltage of 3MV. A diode element immediately upstream of the switch allows current to build up in the inductance of the vacuum transmission line while the switch is open. Upon switch closure, the axial current flowing the the load acts as a bias current to magnetically inhibit current flow in the upstream diode. This diode serves the additional purpose, with or without the flashover switch, of diverting a controlled portion of the total machine current form the load by varying the AK spacing. This feature provides the capability to vary the current and voltage at the load outside the simple constraints of the accelerator's load line. An examination of the performance of the switch and the diode is presented

  19. Sewerage force adjustment technology for energy conservation in vacuum sanitation systems

    Science.gov (United States)

    Guo, Zhonghua; Li, Xiaoning; Kagawa, Toshiharu

    2013-03-01

    The vacuum sanitation is the safe and sound disposal approach of human excreta under the specific environments like flights, high speed trains and submarines. However, the propulsive force of current systems is not adjustable and the energy consumption does not adapt to the real time sewerage requirement. Therefore, it is important to study the sewerage force adjustment to improve the energy efficiency. This paper proposes an energy conservation design in vacuum sanitation systems with pneumatic ejector circuits. The sewerage force is controlled by changing the systematic vacuum degree according to the amount of the excreta. In particular, the amount of the excreta is tested by liquid level sensor and mass sensor. According to the amount of the excreta, the relationship between the excreta amount and the sewerage force is studied to provide proper propulsive force. In the other aspect, to provide variable vacuum degrees for different sanitation requirements, the suction and discharge system is designed with pneumatic vacuum ejector. On the basis of the static flow-rate characteristics and the vacuum generation model, the pressure response in the ejector circuit is studied by using the static flow rate characteristics of the ejector and air status equation. The relationship is obtained between supplied compressed air and systematic vacuum degree. When the compressed air is supplied to the ejector continuously, the systematic vacuum degree increases until the vacuum degree reaches the extreme value. Therefore, the variable systematic vacuum degree is obtained by controlling the compressed air supply of the ejector. To verify the effect of energy conservation, experiments are carried out in the artificial excreta collection, and the variable vacuum-degree design saves more than 30% of the energy supply. The energy conservation is realized effectively in the new vacuum sanitation systems with good application prospect. The proposed technology provides technological

  20. The Fermilab Accelerator control system

    Science.gov (United States)

    Bogert, Dixon

    1986-06-01

    With the advent of the Tevatron, considerable upgrades have been made to the controls of all the Fermilab Accelerators. The current system is based on making as large an amount of data as possible available to many operators or end-users. Specifically there are about 100 000 separate readings, settings, and status and control registers in the various machines, all of which can be accessed by seventeen consoles, some in the Main Control Room and others distributed throughout the complex. A "Host" computer network of approximately eighteen PDP-11/34's, seven PDP-11/44's, and three VAX-11/785's supports a distributed data acquisition system including Lockheed MAC-16's left from the original Main Ring and Booster instrumentation and upwards of 1000 Z80, Z8002, and M68000 microprocessors in dozens of configurations. Interaction of the various parts of the system is via a central data base stored on the disk of one of the VAXes. The primary computer-hardware communication is via CAMAC for the new Tevatron and Antiproton Source; certain subsystems, among them vacuum, refrigeration, and quench protection, reside in the distributed microprocessors and communicate via GAS, an in-house protocol. An important hardware feature is an accurate clock system making a large number of encoded "events" in the accelerator supercycle available for both hardware modules and computers. System software features include the ability to save the current state of the machine or any subsystem and later restore it or compare it with the state at another time, a general logging facility to keep track of specific variables over long periods of time, detection of "exception conditions" and the posting of alarms, and a central filesharing capability in which files on VAX disks are available for access by any of the "Host" processors.

  1. The Fermilab accelerator control system

    International Nuclear Information System (INIS)

    Bogert, D.

    1986-01-01

    With the advent of the Tevatron, considerable upgrades have been made to the controls of all the Fermilab Accelerators. The current system is based on making as large an amount of data as possible available to many operators or end-users. Specifically there are about 100000 separate readings, settings, and status and control registers in the various machines, all of which can be accessed by seventeen consoles, some in the Main Control Room and others distributed throughout the complex. A ''Host'' computer network of approximately eighteen PDP-11/34's, seven PDP-11/44's, and three VAX-11/785's supports a distributed data acquisition system including Lockheed MAC-16's left from the original Main Ring and Booster instrumentation and upwards of 1000 Z80, Z8002, and M68000 microprocessors in dozens of configurations. Interaction of the various parts of the system is via a central data base stored on the disk of one of the VAXes. The primary computer-hardware communication is via CAMAC for the new Tevatron and Antiproton Source; certain subsystems, among them vacuum, refrigeration and quench protection, reside in the distributed microprocessors and communicate via GAS, an in-house protocol. An important hardware feature is an accurate clock system making a large number of encoded ''events'' in the accelerator supercycle available for both hardware modules and computers. System software features include the ability to save the current state of the machine or any subsystem and later restore it or compare it with the state at another time, a general logging facility to keep track of specific variables over long periods of time, detection of 'exception conditions' and the posting of alarms, and a central filesharing capability in which files on VAX disks are available for access by any of the ''Host'' processors. (orig.)

  2. Proceedings of the national symposium on vacuum science and technology and power beams. Volume 2

    International Nuclear Information System (INIS)

    Venkatramani, N.; Ray, A.K.

    1997-11-01

    This volume contains the proceedings of the national symposium on vacuum science and technology and power beams. The main topics dealt with are: accelerators and vacuum systems, thin films deposition techniques, lasers and electron power beams and their applications in nuclear facilities. Papers relevant to INIS are indexed separately

  3. LHC Detector Vacuum System Consolidation for Long Shutdown 1 (LS1) in 2013-2014

    CERN Document Server

    Gallilee, M; Cruikshank, P; Gallagher, J; Garion, C; Jimenez, J M; Kersevan, R; Kos, H; Leduc, L; Lepeule, P; Provot, N; Rambeau, H; Veness, R

    2012-01-01

    The LHC has ventured into unchartered territory for Particle Physics accelerators. A dedicated consolidation program is required between 2013 and 2014 to ensure optimal physics performance. The experiments, ALICE, ATLAS, CMS, and LHCb, will utilise this shutdown, along with the gained experience of three years of physics running, to make optimisations to their detectors. New vacuum technologies have been developed for the experimental areas, to be integrated during this first phase shutdown. These technologies include bellows, vacuum chambers and ion pumps in aluminium, new beryllium vacuum chambers, and composite mechanical supports. An overview of this first phase consolidation program for the LHC experiments is presented.

  4. Voltage measurements at the vacuum post-hole convolute of the Z pulsed-power accelerator

    Directory of Open Access Journals (Sweden)

    E. M. Waisman

    2014-12-01

    Full Text Available Presented are voltage measurements taken near the load region on the Z pulsed-power accelerator using an inductive voltage monitor (IVM. Specifically, the IVM was connected to, and thus monitored the voltage at, the bottom level of the accelerator’s vacuum double post-hole convolute. Additional voltage and current measurements were taken at the accelerator’s vacuum-insulator stack (at a radius of 1.6 m by using standard D-dot and B-dot probes, respectively. During postprocessing, the measurements taken at the stack were translated to the location of the IVM measurements by using a lossless propagation model of the Z accelerator’s magnetically insulated transmission lines (MITLs and a lumped inductor model of the vacuum post-hole convolute. Across a wide variety of experiments conducted on the Z accelerator, the voltage histories obtained from the IVM and the lossless propagation technique agree well in overall shape and magnitude. However, large-amplitude, high-frequency oscillations are more pronounced in the IVM records. It is unclear whether these larger oscillations represent true voltage oscillations at the convolute or if they are due to noise pickup and/or transit-time effects and other resonant modes in the IVM. Results using a transit-time-correction technique and Fourier analysis support the latter. Regardless of which interpretation is correct, both true voltage oscillations and the excitement of resonant modes could be the result of transient electrical breakdowns in the post-hole convolute, though more information is required to determine definitively if such breakdowns occurred. Despite the larger oscillations in the IVM records, the general agreement found between the lossless propagation results and the results of the IVM shows that large voltages are transmitted efficiently through the MITLs on Z. These results are complementary to previous studies [R. D. McBride et al., Phys. Rev. ST Accel. Beams 13, 120401 (2010

  5. Vacuum system and cleaning techniques in the FTU machines

    International Nuclear Information System (INIS)

    Alessandrini, C.; Apicella, M.L.; Ferro, C.

    1988-01-01

    FTU (Frascati Tokamak Upgrade) is a high magnetic field (8T) tokamak under construction at the Frascati Energy Research Center (ENEA). Its vacuum systems has been already manifactured and is presently being assembled. It consist of an all metallic fully welded vessel, pumped by six turbomolecular pumps. The vacuum system has been dimensioned to allow a base pressure lower than 2.6 x 10 -6 Pa. The paper reports the design philosophy of the vacuum system. The results of the cleaning techniques performed on a 1:1 scale toroidal sector of FTU are also presented and discussed

  6. Experience with the TRIUMF Main Tank Vacuum Control System

    International Nuclear Information System (INIS)

    Sarkar, S.; Yandon, J.C.; Sievers, W.; Bennett, P.; Gurd, D.P.; Harmer, P.; Nelson, J.

    1993-01-01

    The TRIUMF Main Tank Vacuum Control System was upgraded in 1984. The earlier system, which consisted of a collection of hardwired relay logic boxes housed in three standard instrumentation racks, was replaced with a compact and flexible microprocessor-based control system. The user interface, previously distributed over the three racks, was consolidated into a single hardwired control and mimic panel. Since 1984, the Main Tank Vacuum System has undergone a series of changes in configuration and vacuum pumping hardware with necessary changes being implemented in the control system logic. Corresponding changes to the user interface were sometimes difficult to implement and in time exhausted the spare input/output capacity which had been built into the panel. The availability of inexpensive personal computers with adequate graphics capability and the ease of modifying, or adding to a programmable user interface precipitated the retirement of the hardwired panel and its replacement by a PC-based graphics user interface. System configuration, safety considerations, the hardware and the software implementation using the open-quote C close-quote programming language are described. The evolution of the control system and its performance, both over the years and in adapting to the vacuum system changes, are discussed

  7. Metal and elastomer seal tests for accelerator applications

    International Nuclear Information System (INIS)

    Welch, K.M.; McIntyre, G.T.; Tuozzolo, J.E.; Skelton, R.; Pate, D.J.; Gill, S.M.

    1989-01-01

    The vacuum system of the Alternating Gradient Synchrotron (AGS) at Brookhaven National Laboratory has more than a thousand metal vacuum seals. Also, numerous elastomer seals are used throughout the AGS to seal large beam component chambers. An accelerator upgrade program is being implemented to reduce the AGS operating pressure by x100 and improve the reliability of the vacuum system. This paper describes work in progress on metal and elastomer vacuum seals to help meet those two objectives. Tests are reported on the sealing properties of a variety of metal seals used on different sealing surfaces. Results are also given on reversible sorption properties of certain elastomers. 16 refs., 6 figs., 4 tabs

  8. Design and performance of an in situ high vacuum STM in beam line at 15 UD pelletron accelerator

    International Nuclear Information System (INIS)

    Singh, J.P.; Tripathi, A.; Ahuja, R.; Dutt, R.N.; Kanjilal, D.; Mehta, G.K.; Raychoudhuri, A.K.

    2000-01-01

    The design, installation and performance of an in situ high vacuum STM in the materials science beam line of 15 UD tandem Pelletron accelerator, NSC are reported. The scanning tunneling microscope (STM) has imaged highly oriented pyrolytic graphite (HOPG) surfaces with atomic resolution. Local current-voltage spectroscopy has also been performed on p-type Si (111) samples. A band gap of 1.09 ± 0.1 eV was calculated. (author)

  9. The vacuum system of the Karlsruhe magnetic spectrograph 'Little John'

    International Nuclear Information System (INIS)

    Buschmann, J.; Gils, H.J.; Jelitto, H.; Krisch, J.; Ludwig, G.; Manger, D.; Rebel, H.; Seith, W.; Zagromski, S.

    1985-02-01

    The vacuum equipment of the magnetic spectrograph Little John is described. The system is characterized by the following special features: The sliding exit flange of the target chamber can be moved to the desired angle of observation without affecting the high vacuum. The pressure maintained is less by a factor of ten than the pressure in the incoming beam tubing. The vacuum system is divided into several separate pumping sections. Ground loops are strictly avoided. All actual states of relevance are fed back to the control panels. The vacuum installation is protected by hardware interlocking systems as well as by a real time program written in FORTRAN in cooperation with CAMAC interfacing. (orig.) [de

  10. 242-A evaporator vacuum condenser system

    International Nuclear Information System (INIS)

    Smith, V.A.

    1994-01-01

    This document is written for the 242-A evaporator vacuum condenser system (VCS), describing its purpose and operation within the evaporator. The document establishes the operating parameters specifying pressure, temperature, flow rates, interlock safety features and interfacing sub-systems to support its operation

  11. Design and status of the AGS booster accelerator

    International Nuclear Information System (INIS)

    Forsyth, E.B.; Lee, Y.Y.

    1987-01-01

    Comments are given on some areas of the design considered for the AGS Booster Accelerator, including lattice design, energy and repetition rate, injection, radio frequency system, and the vacuum system. The current status is then briefly described

  12. PREFACE: International Symposium on Vacuum Science & Technology and its Application for Accelerators (IVS 2012)

    Science.gov (United States)

    Pandit, V. S.; Pal, Gautam

    2012-11-01

    The Indian Vacuum Society (IVS) was established in 1970 to promote vacuum science and technology in academic, industrial and R&D institutions in India. IVS is a member society of the International Union for Vacuum Science, Technique and Applications (IUVSTA). It has organized International and national symposia, short term courses and workshops on different aspects of Vacuum Science and Technology at regular intervals. So far 27 National symposia, 4 International Symposia and 47 courses have been organized at various locations in India. There has been an active participation from R&D establishments, universities and Indian industries during all these events. In view of the current global situation and emerging trends in vacuum technology, the executive committee of the IVS suggested to us that we organize an International Symposium at the Variable Energy Cyclotron Centre, Kolkata from 15-17 February 2012. At the Variable Energy Cyclotron Centre we have a large number of high vacuum systems used in the K130 Cyclotron and K500 Superconducting Cyclotron. Also a large cryogenic system using LHe plant is in operation for cryopanels and a superconducting magnet for K-500 Cyclotron. The main areas covered at the symposium were the production and measurement of vacuums, leak detection, design and development of large vacuum systems, vacuum metallurgy, vacuum materials and the application of high vacuums in cyclotrons, LINACS and other accelerators. This symposium provided an opportunity for interaction between active researchers and technologists and allowed them to review the current situation, report recent experimental results, share the available expertise and consider the future R&D efforts needed in this area. Keeping the industrial significance of vacuum technology in mind, an exhibition of the vacuum related equipment, accessories, products etc by various suppliers and manufactures was organized alongside the symposium. Participation by a large number of exhibitors

  13. Vacuum pumping system for the JT-60 radio-frequency heating system

    International Nuclear Information System (INIS)

    Yokokura, Kenji; Ikeda, Yoshitaka; Imai, Tuyoshi; Suganuma, Kazuaki; Nagashima, Takashi

    1988-01-01

    The basic design requirements set up for the JT-60 radio-frequency heating system included: (1) rapid pumping of gas released upon application of a radio-frequency power to maintain the pressure in the launchers at 10 -2 - 10 -3 Pa or less, (2) incorporation of a gas analysis system that can operate under a strong field and high pressure (>10 -2 Pa) to permit remote controlled data collection and processing, and (3) low cost, multiple functions and high reliability. The vacuum pumping system, consisting of three units for low hybrid radio-frequency (LHRF) and one unit for ion cyclotron radio-frequency (ICRF), is connected to each launcher provided at the four ports of JT-60. The LHRF unit is composed of a main pump, an alumina joint for electrical insulation from the launcher, a metallic gate valve for isolation from the JT-60 vacuum region, and various vacuum gauges. Only a turbo-molecular pump is used for the ICRF system because a large-scale differential pumping is not required. A gas measuring system is incorporated which consists of a mass filter, personal computer, turbo-molecular pump, and variable flow valve equipped with an APG control. This system is designed to identify and make use of gas impurities released during the launcher aging process. The control system employed consists of a personal computer, interlock control board, data logger and other devices such as vacuum gages. (Nogami, K.)

  14. On excitation and radiation of detector moving in vacuum with acceleration or moving rectilinearly with superluminal velocity in a medium

    International Nuclear Information System (INIS)

    Ginzburg, V.L.; Frolov, V.P.

    1986-01-01

    The problem of excitation of a detector moving in vacuum with constant acceleration is being discussed in recent years. It is noted in the paper that this excitation and radiation associated with it are similar to those taking place in the range of anomalous Doppler effect occurring during motion of the detector with constant superluminal velocity in medium

  15. Venturi vacuum systems for hypobaric chamber operations.

    Science.gov (United States)

    Robinson, R; Swaby, G; Sutton, T; Fife, C; Powell, M; Butler, B D

    1997-11-01

    Physiological studies of the effects of high altitude on man often require the use of a hypobaric chamber to simulate the reduced ambient pressures. Typical "altitude" chambers in use today require complex mechanical vacuum systems to evacuate the chamber air, either directly or via reservoir system. Use of these pumps adds to the cost of both chamber procurement and maintenance, and service of these pumps requires trained support personnel and regular upkeep. In this report we describe use of venturi vacuum pumps to perform the function of mechanical vacuum pumps for human and experimental altitude chamber operations. Advantages of the venturi pumps include their relatively low procurement cost, small size and light weight, ease of installation and plumbing, lack of moving parts, and independence from electrical power sources, fossil fuels and lubricants. Conversion of three hyperbaric chambers to combined hyper/hypobaric use is described.

  16. Design and status of the AGS booster accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, E.B.; Lee, Y.Y.

    1987-01-01

    Comments are given on some areas of the design considered for the AGS Booster Accelerator, including lattice design, energy and repetition rate, injection, radio frequency system, and the vacuum system. The current status is then briefly described. (LEW)

  17. 14. conference on accelerators of charged particles. Annotations of reports

    International Nuclear Information System (INIS)

    1994-01-01

    Annotations of reports made at the 14 Conference on accelerators of charged particles are presented. The Conference took place 25 - 27 October, 1994 in IHEP, Protvino. Modern trends of development of cyclic and linear accelerators, as well as heavy ion accelerators and colliders have been discussed. Problems of developing accelerators on superhigh energy have been considered. Considerable attention has been paid to accelerating structures, power SHF equipment, beam monitoring systems as well as magnetic and vacuum systems of accelerators. Beam dynamics in accelerators and storage has been considered and new acceleration technique have been proposed. Utilization of accelerators for medicine and other applied purposes has been discussed

  18. Design of cryo-vacuum system for MW neutral beam injector

    International Nuclear Information System (INIS)

    Hu Chundong; Xie Yuanlai

    2010-01-01

    Neutral beam injector is an equipment that is used to produce and then to neutralize high energetic particle beam. A neutral beam injector (EAST-NBI) with MW magnitude neutral beam power is considered to be developed to support the EAST physical research. The requirements for vacuum system were analyzed after introducing the principle of EAST-NBI. A differential vacuum system structure was chosen after analyzing the performance of different vacuum pumping system structure. The gas sources and their characteristics were analyzed, and two inserted type cryocondensation pumps were chosen as main vacuum pump. The schematic structure of the two cryocondensation pump with pumping area 8 m 2 and 6 m 2 were given and their cooling method and temperature control mode were determined. (authors)

  19. Human machine interface based on labview for vacuum system operation of cyclotron proton DECY-13 MeV

    International Nuclear Information System (INIS)

    Fajar Sidik Permana; Saminto; Kurnia Wibowo; Vika Arwida Fanita Sari

    2016-01-01

    Center of Accelerator Science and Technology (CAST), BATAN is designing DECY-13 MeV Proton Cyclotron. So far, this operation system has been conducted conventionally. In this research, an Human Machine Interface system has been successfully built for simplifying operation and monitoring pressure inside vacuum chamber of cyclotron DECY-13 MeV. HMI system is built with LabVIEW software and integrated with Programmable Logic Controller FX-2424 series and NI cRIO (NI-9025 and NI-9870) module. HMI system consist of turning on/of pumps (rotary and diffusion), opening/ closing valve automatically, and retrieving of data from sensor in real time. (author)

  20. Construction of vacuum system for Tristan accumulation ring

    International Nuclear Information System (INIS)

    Ishimaru, H.; Horikoshi, G.; Kobayashi, M.; Kubo, T.; Mizuno, H.; Momose, T.; Narushima, K.; Watanabe, H.; Yamaguchi, H.

    1983-01-01

    An all aluminum-alloy vacuum system for the TRISTAN accumulation ring is now under construction. Aluminum and aluminum alloys are preferred materials for ultrahigh vacuum systems of large electron storage rings because of their good thermal conductivity, extremely low outgassing rate, and low residual radioactivity. Vacuum beam chambers for the dipole and quadrupole magnets are extruded using porthole dies. The aluminum alloy 6063-T6 provides superior performance in extrusion. For ultrahigh vacuum performance, a special extrusion technique is applied which, along with the outgassing procedure used, is described in detail. Aluminum alloy 3004 seamless elliptical bellows are inserted between the dipole and quadrupole magnet chambers. These bellows are produced by the hydraulic forming of a seamless tube. The seamless bellows and the beam chambers are joined by fully automatic welding. The ceramic chambers for the kicker magnets, the fast bump magnets, and the slow beam intensity monitor are inserted in the aluminum alloy beam chambers. The ceramic chamber (98% alumina) and elliptical bellows are brazed with brazing sheets (4003-3003-4003) in a vacuum furnace. The brazing technique is described. The inner surface of the ceramic chamber is coated with a TiMo alloy by vacuum evaporation to permit a smooth flow of the RF wall current. Other suitable aluminum alloy components, including fittings, feedthroughs, gauges, optical windows, sputter ion pumps, turbomolecular pumps, and valves have been developed; their fabrication is described

  1. Evaluation of ISABELLE full cell ultra high vacuum system

    International Nuclear Information System (INIS)

    Foerster, C.L.; Briggs, J.; Chou, T.S.; Stattel, P.

    1980-01-01

    The ISABELLE Full Cell Vacuum System consisting of a 40 m long, by 8.8 cm diameter stainless steel tube pumped by seven pumping stations was assembled and processed for 10 -12 Torr operation. Evaluation and testing of the system and its sub-assemblies has been completed. Detail design of system components and the determination of the conditioning process was completed. The best procedure to rough pump, leak test, vacuum bake the system, condition pumps, degas gauges, turn on ion pumps and flash sublimation pumps was established. Pressures below 2 x 10 -11 Torr are now routinely achieved in normal operation of the Full Cell. This includes pump down after replacement of various components and pump down after back fill with moist unfiltered air. The techniques developed for the Full Cell will be used to build the ISABELLE Ultra High Vacuum System

  2. Vacuum Acceptance Tests for the UHV Room Temperature Vacuum System of the LHC during LS1

    CERN Document Server

    Cattenoz, G; Bregliozzi, G; Calegari, D; Gallagher, J; Marraffa, A; Chiggiato, P

    2014-01-01

    During the CERN Large Hadron Collider (LHC) first long shut down (LS1), a large number of vacuum tests are carried out on consolidated or newly fabricated devices. In such a way, the vacuum compatibility is assessed before installation in the UHV system of the LHC. According to the equipment’s nature, the vacuum acceptance tests consist in functional checks, leak test, outgassing rate measurements, evaluation of contaminants by Residual Gas Analysis (RGA), pumping speed measurements and qualification of the H2 sticking probability of Non-Evaporable-Getter (NEG) coating. In this paper, the methods used for the tests and the acceptance criteria are described. A summary of the measured vacuum characteristics for the tested components is also given.

  3. Design and construction of Alborz tokamak vacuum vessel system

    International Nuclear Information System (INIS)

    Mardani, M.; Amrollahi, R.; Koohestani, S.

    2012-01-01

    Highlights: ► The Alborz tokamak is a D-shape cross section tokamak that is under construction in Amirkabir University of Technology. ► As one of the key components for the device, the vacuum vessel can provide ultra-high vacuum and clean environment for the plasma operation. ► A limiter is a solid surface which defines the edge of the plasma and designed to protect the wall from the plasma, localizes the plasma–surface interaction and localizes the particle recycling. ► Structural analyses were confirmed by FEM model for dead weight, vacuum pressure and plasma disruptions loads. - Abstract: The Alborz tokamak is a D-shape cross section tokamak that is under construction in Amirkabir University of Technology. At the heart of the tokamak is the vacuum vessel and limiter which collectively are referred to as the vacuum vessel system. As one of the key components for the device, the vacuum vessel can provide ultra-high vacuum and clean environment for the plasma operation. The VV systems need upper and lower vertical ports, horizontal ports and oblique ports for diagnostics, vacuum pumping, gas puffing, and maintenance accesses. A limiter is a solid surface which defines the edge of the plasma and designed to protect the wall from the plasma, localizes the plasma–surface interaction and localizes the particle recycling. Basic structure analyses were confirmed by FEM model for dead weight, vacuum pressure and plasma disruptions loads. Stresses at general part of the VV body are lower than the structure material allowable stress (117 MPa) and this analysis show that the maximum stresses occur near the gravity support, and is about 98 MPa.

  4. Vacuum seals design and testing for a linear accelerator of the National Spallation Neutron Source

    Energy Technology Data Exchange (ETDEWEB)

    Z. Chen; C. Gautier; F. Hemez; N. K. Bultman

    2000-02-01

    Vacuum seals are very important to ensure that the Spallation Neutron Source (SNS) Linac has an optimum vacuum system. The vacuum joints between flanges must have reliable seals to minimize the leak rate and meet vacuum and electrical requirements. In addition, it is desirable to simplify the installation and thereby also simplify the maintenance required. This report summarizes an investigation of the metal vacuum seals that include the metal C-seal, Energized Spring seal, Helcoflex Copper Delta seal, Aluminum Delta seal, delta seal with limiting ring, and the prototype of the copper diamond seals. The report also contains the material certifications, design, finite element analysis, and testing for all of these seals. It is a valuable reference for any vacuum system design. To evaluate the suitability of several types of metal seals for use in the SNS Linac and to determine the torque applied on the bolts, a series of vacuum leak rate tests on the metal seals have been completed at Los Alamos Laboratory. A copper plated flange, using the same type of delta seal that was used for testing with the stainless steel flange, has also been studied and tested. A vacuum seal is desired that requires significantly less loading than a standard ConFlat flange with a copper gasket for the coupling cavity assembly. To save the intersegment space the authors use thinner flanges in the design. The leak rate of the thin ConFlat flange with a copper gasket is a baseline for the vacuum test on all seals and thin flanges. A finite element analysis of a long coupling cavity flange with a copper delta seal has been performed in order to confirm the design of the long coupling cavity flange and the welded area of a cavity body with the flange. This analysis is also necessary to predict a potential deformation of the cavity under the combined force of atmospheric pressure and the seating load of the seal. Modeling of this assembly has been achieved using both HKS/Abaqus and COSMOS

  5. Vacuum seals design and testing for a linear accelerator of the National Spallation Neutron Source

    International Nuclear Information System (INIS)

    Chen, Z.; Gautier, C.; Hemez, F.; Bultman, N.K.

    2000-01-01

    Vacuum seals are very important to ensure that the Spallation Neutron Source (SNS) Linac has an optimum vacuum system. The vacuum joints between flanges must have reliable seals to minimize the leak rate and meet vacuum and electrical requirements. In addition, it is desirable to simplify the installation and thereby also simplify the maintenance required. This report summarizes an investigation of the metal vacuum seals that include the metal C-seal, Energized Spring seal, Helcoflex Copper Delta seal, Aluminum Delta seal, delta seal with limiting ring, and the prototype of the copper diamond seals. The report also contains the material certifications, design, finite element analysis, and testing for all of these seals. It is a valuable reference for any vacuum system design. To evaluate the suitability of several types of metal seals for use in the SNS Linac and to determine the torque applied on the bolts, a series of vacuum leak rate tests on the metal seals have been completed at Los Alamos Laboratory. A copper plated flange, using the same type of delta seal that was used for testing with the stainless steel flange, has also been studied and tested. A vacuum seal is desired that requires significantly less loading than a standard ConFlat flange with a copper gasket for the coupling cavity assembly. To save the intersegment space the authors use thinner flanges in the design. The leak rate of the thin ConFlat flange with a copper gasket is a baseline for the vacuum test on all seals and thin flanges. A finite element analysis of a long coupling cavity flange with a copper delta seal has been performed in order to confirm the design of the long coupling cavity flange and the welded area of a cavity body with the flange. This analysis is also necessary to predict a potential deformation of the cavity under the combined force of atmospheric pressure and the seating load of the seal. Modeling of this assembly has been achieved using both HKS/Abaqus and COSMOS

  6. PEP-II vacuum system pressure profile modeling using EXCEL

    International Nuclear Information System (INIS)

    Nordby, M.; Perkins, C.

    1994-06-01

    A generic, adaptable Microsoft EXCEL program to simulate molecular flow in beam line vacuum systems is introduced. Modeling using finite-element approximation of the governing differential equation is discussed, as well as error estimation and program capabilities. The ease of use and flexibility of the spreadsheet-based program is demonstrated. PEP-II vacuum system models are reviewed and compared with analytical models

  7. Electron acceleration from rest to GeV energy by chirped axicon Gaussian laser pulse in vacuum in the presence of wiggler magnetic field

    Science.gov (United States)

    Kant, Niti; Rajput, Jyoti; Singh, Arvinder

    2018-03-01

    This paper presents a scheme of electron energy enhancement by employing frequency - chirped lowest order axicon focussed radially polarised (RP) laser pulse in vacuum under the influence of wiggler magnetic field. Terawatt RP laser can be focussed down to ∼5μm by an axicon optical element, which produces an intense longitudinal electric field. This unique property of axicon focused Gaussian RP laser pulse is employed for direct electron acceleration in vacuum. A linear frequency chirp increases the time duration of laser-electron interaction, whereas, the applied magnetic wiggler helps in improving the strength of ponderomotive force v→ ×B→ and periodically deflects electron in order to keep it traversing in the accelerating phase up to longer distance. Numerical simulations have been carried out to investigate the influence of laser, frequency chirp and magnetic field parameters on electron energy enhancement. It is noticed that an electron from rest can be accelerated up to GeV energy under optimized laser and magnetic field parameters. Significant enhancement in the electron energy gain of the order of 11.2 GeV is observed with intense chirped laser pulse in the presence of wiggler magnetic field of strength 96.2 kG.

  8. Operating Characteristics of the low energy accelerator

    International Nuclear Information System (INIS)

    Abd El-Baki, M.M.; Abd El-Rahman, M.M.

    2000-01-01

    The main purpose of this work is to describe the construction and operation of low energy accelerator with energy in the range from (zero to 100 KeV.). This accelerator includes an ion source of the cold cathode penning type (with pierce geometry for ion beam extraction), an accelerating tube (with 8 electrodes) and faraday cup for measuring ion current. A vacuum system which gives vacuum of the order 3.0 x 10 8 torr is used. A palladium tube is used to supply the source with pure hydrogen atoms. It was possible to operate this accelerator with an energy 50 KeV. at minimum hydrogen pressure. 6.3 x 10 6 torr. The total resistance applied between the accelerating electrodes R T = 31.5 M OMEGA. These data includes the influence of the pressure in the accelerating tube, the magnetic field of the ion source, the extraction potential and the accelerating potential on the collector ion current. It was possible to accelerate protons with an energy 50 KeV with current about 100 MU A at pressure 6.3 x 10 6 Torr, the source magnetic field + 1100 gauss (I B = 2A), the current = 0.4 A and the extraction potential = 10 K. V

  9. Architecture of petawatt-class z-pinch accelerators

    International Nuclear Information System (INIS)

    Stygar, William A.; Mazarakis, Michael Gerrassimos; Cuneo, Michael Edward; Leeper, Ramon Joe; Ives, H.C.; Headley, D.I.; Wagoner, Tim C.; Porter, John Larry Jr.

    2006-01-01

    We have developed an accelerator architecture that can serve as the basis of the design of petawatt-class z-pinch drivers. The architecture has been applied to the design of two z-pinch accelerators, each of which can be contained within a 104-m-diameter cylindrical tank. One accelerator is driven by slow (∼1 (micro)s) Marx generators, which are a mature technology but which necessitate significant pulse compression to achieve the short pulses ( 4 capacitors, store 98 MJ, and erect to 5 MV; (ii) 600 water-dielectric triplate intermediate-store transmission lines, which also serve as pulse-forming lines; (iii) 600 5-MV laser-triggered gas switches; (iv) three monolithic radial-transmission-line impedance transformers, with triplate geometries and exponential impedance profiles; (v) a 6-level 5.5-m-diameter 15-MV vacuum insulator stack; (vi) six magnetically insulated vacuum transmission lines (MITLs); and (vii) a triple-post-hole vacuum convolute that adds the output currents of the six MITLs, and delivers the combined current to a z-pinch load. The accelerator delivers an effective peak current of 52 MA to a 10-mm-length z pinch that implodes in 95 ns, and 57 MA to a pinch that implodes in 120 ns. The LTD-driven accelerator includes monolithic radial transformers and a MITL system similar to those described above, but does not include intermediate-store transmission lines, multimegavolt gas switches, or a laser trigger system. Instead, this accelerator is driven by 210 LTD modules that include a total of 1 x 10 6 capacitors and 5 x 10 5 200-kV electrically triggered gas switches. The LTD accelerator stores 182 MJ and produces a peak electrical power of 1000 TW. The accelerator delivers an effective peak current of 68 MA to a pinch that implodes in 95 ns, and 75 MA to a pinch that implodes in 120 ns. Conceptually straightforward upgrades to these designs would deliver even higher pinch currents and faster implosions

  10. Cold Vacuum Drying Instrument Air System Design Description (SYS 12)

    Energy Technology Data Exchange (ETDEWEB)

    SHAPLEY, B.J.; TRAN, Y.S.

    2000-06-05

    This system design description (SDD) addresses the instrument air (IA) system of the spent nuclear fuel (SNF). This IA system provides instrument quality air to the Cold Vacuum Drying (CVD) Facility. The IA system is a general service system that supports the operation of the heating, ventilation, and air conditioning (HVAC) system, the process equipment skids, and process instruments in the CVD Facility. The following discussion is limited to the compressor, dryer, piping, and valving that provide the IA as shown in Drawings H-1-82222, Cold Vacuum Drying Facility Mechanical Utilities Compressed & Instrument Air P&ID, and H-1.82161, Cold Vacuum Drying Facility Process Equipment Skid P&ID MCO/Cusk Interface. Figure 1-1 shows the physical location of the 1A system in the CVD Facility.

  11. The JET vacuum interspace system

    International Nuclear Information System (INIS)

    Orchard, J.; Scales, S.

    1999-01-01

    In the past JET has suffered from a number of vacuum leaks on components such as bellows, windows and feedthroughs due, in part, to the adverse conditions, including high mechanical forces, which may prevail during plasma operation. Therefore before the recent Tritium experiments on JET it was deemed prudent to manufacture and install items with a secondary containment or interspace in order to minimise the effect of failure of the primary vacuum barrier on both the leak integrity of the machine and the outcome of the experiments. This paper describes the philosophy, logistics, method and implementation of an integrated connection and monitoring system on the 330 interspaces currently in position on the JET machine. Using the JET leak database comparisons are drawn of leak failure rates of the components allied to the number of operational hours, prior to the system being present and after installation and commissioning, and the case of detection compared to the previous situation. An argument is also presented on the feasibility and adaptability of this system to any large complex machine and the benefits to be obtained in reduction of leaks and operational down time. (author)

  12. The measurement of vacuum at high voltage terminal of the FOTIA facility at BARC

    International Nuclear Information System (INIS)

    Kansara, M.J.; Sapna, P.; Subrahmanyam, N.B.V.; Bhatt, J.P.; Gupta, S.K.; Singh, P.

    2003-01-01

    Full text: In FOTIA, the ion beams accelerated by the low energy tube are injected into the high-energy accelerating tube using the 180 deg folding magnet. In order to have maximum transmission through the magnet chamber the vacuum in this section should be in the range of 10 -8 Torr. The chamber is very narrow (14 mm x 24 mm) and offers low conductance to the vacuum system. For maintaining the required UHV inside this chamber and associated beam lines inside the high voltage terminal at 6 MV, a sputter ion pump (120 litres/sec) is used. However, the control of the ion pump and measurement of the vacuum in the chamber has to be done from the control consol located at ground potential. This has been accomplished through a fibre optic data telemetry system, which offers electrical isolation of 6 MV. This fibre optic system is integrated to the main control system of the FOTIA. For controlling and monitoring the ion pump DOUT and ADC modules of the CAMAC system are used to provide interfacing signals to the fibre optic system. For the measurement of the vacuum, the gauge output provided by the ion pump is converted to a suitable light signal (1 kHz to 10 kHz) and is transmitted to the fibre optic link box (located at ground). At ground level this light signal is converted back to a voltage signal and transmitted to ADC module of the CAMAC system. This voltage signal is calibrated against the vacuum measured in the terminal, which is available in the control room via computer connected to the CAMAC system. In this paper, details of the above system will be presented

  13. Comparison of occlusion break responses and vacuum rise times of phacoemulsification systems.

    Science.gov (United States)

    Sharif-Kashani, Pooria; Fanney, Douglas; Injev, Val

    2014-07-30

    Occlusion break surge during phacoemulsification cataract surgery can lead to potential surgical complications. The purpose of this study was to quantify occlusion break surge and vacuum rise time of current phacoemulsification systems used in cataract surgery. Occlusion break surge at vacuum pressures between 200 and 600 mmHg was assessed with the Infiniti® Vision System, the WhiteStar Signature® Phacoemulsification System, and the Centurion® Vision System using gravity-fed fluidics. Centurion Active FluidicsTM were also tested at multiple intraoperative pressure target settings. Vacuum rise time was evaluated for Infiniti, WhiteStar Signature, Centurion, and Stellaris® Vision Enhancement systems. Rise time to vacuum limits of 400 and 600 mmHg was assessed at flow rates of 30 and 60 cc/minute. Occlusion break surge was analyzed by 2-way analysis of variance. The Centurion system exhibited substantially less occlusion break surge than the other systems tested. Surge area with Centurion Active Fluidics was similar to gravity fluidics at an equivalent bottle height. At all Centurion Active Fluidics intraoperative pressure target settings tested, surge was smaller than with Infiniti and WhiteStar Signature. Infiniti had the fastest vacuum rise time and Stellaris had the slowest. No system tested reached the 600-mmHg vacuum limit. In this laboratory study, Centurion had the least occlusion break surge and similar vacuum rise times compared with the other systems tested. Reducing occlusion break surge may increase safety of phacoemulsification cataract surgery.

  14. Temperature control system for the study of single event effects in integrated circuits using a cyclotron accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Bakerenkov, A.S., E-mail: as_bakerenkov@list.ru [National Research Nuclear University MEPhI (Moscow Engineering Physics Institute), Moscow (Russian Federation); Belyakov, V.V. [National Research Nuclear University MEPhI (Moscow Engineering Physics Institute), Moscow (Russian Federation); Kozyukov, A.E. [Joint-Stock Company Institute of Space Device Engineering (JSC ISDE), Moscow (Russian Federation); Pershenkov, V.S.; Solomatin, A.V.; Shurenkov, V.V. [National Research Nuclear University MEPhI (Moscow Engineering Physics Institute), Moscow (Russian Federation)

    2015-02-11

    The temperature control system for the study of single event disruptions produced by hard ion impacts in integrated circuits is described. Heating and cooling of the irradiated device are achieved using thermoelectric modules (Peltier modules). The thermodynamic performance of the system is estimated. The technique for the numerical estimation of the main parameters of the temperature control system for cooling and heating is considered. The results of a test of the system in a vacuum cell of an accelerator are presented.

  15. Temperature control system for the study of single event effects in integrated circuits using a cyclotron accelerator

    International Nuclear Information System (INIS)

    Bakerenkov, A.S.; Belyakov, V.V.; Kozyukov, A.E.; Pershenkov, V.S.; Solomatin, A.V.; Shurenkov, V.V.

    2015-01-01

    The temperature control system for the study of single event disruptions produced by hard ion impacts in integrated circuits is described. Heating and cooling of the irradiated device are achieved using thermoelectric modules (Peltier modules). The thermodynamic performance of the system is estimated. The technique for the numerical estimation of the main parameters of the temperature control system for cooling and heating is considered. The results of a test of the system in a vacuum cell of an accelerator are presented

  16. TFCX pumped limiter and vacuum pumping system design and analysis

    International Nuclear Information System (INIS)

    Haines, J.R.

    1985-04-01

    Impurity control system design and performance studies were performed in support of the Tokamak Fusion Core Experiment (TFCX) pre-conceptual design. Efforts concentrated on pumped limiter and vacuum pumping system design configuration, thermal/mechanical and erosion lifetime performance of the limiter protective surface, and helium ash removal performance. The reference limiter design forms a continuous toroidal belt at the bottom of the device and features a flat surface with a single leading edge. The vacuum pumping system features large vacuum ducts (diameter approximately 1 m) and high-speed, compound cryopumps. Analysis results indicate that the limiter/vacuum pumping system design provides adequate helium ash removal. Erosion, primarily by disruption-induced vaporization and/or melting, limits the protective surface lifetime to about one calendar year or only about 60 full-power hours of operation. In addition to evaluating impurity control system performance for nominal TFCX conditions, these studies attempt to focus on the key plasma physics and engineering design issues that should be addressed in future research and development programs

  17. Project and implementation of the control system for the microtron accelerator

    International Nuclear Information System (INIS)

    Malafronte, Alexandre Almeida

    2008-01-01

    The racetrack microtron under construction at the Instituto de Fisica da Universidade de Sao Paulo, is a recirculated electron accelerator that has a few hundred parameters to be monitored and controlled. These parameters belong to several subsystems like transport, vacuum, RF, and diagnostics. To decrease the cognitive burden of the operator and help him to control the machine a computerized control system was built, pervading all subsystems. This system allows the operator to measure and change the parameters of interest, or alerts him when some of these parameters exceed a pre-defined value. The system was built using the three-layer model methodology: input and output device layer; device server layer; and the user interface layer. In the input and output device layer, several instruments with different communication interfaces were used, either commercial or in-house built. In the device server layer industrial PCs were used. The user interface layer uses a conventional PC running a human-computer interface built with assistance of the Lab Windows/CVI software (National Instruments). The control system must satisfy requirements of flexibility, upgradability and cost, must stand during the accelerator lifetime and allow maintenance by the Lab's technical support. (author)

  18. Apollo telescope mount thermal systems unit thermal vacuum test

    Science.gov (United States)

    Trucks, H. F.; Hueter, U.; Wise, J. H.; Bachtel, F. D.

    1971-01-01

    The Apollo Telescope Mount's thermal systems unit was utilized to conduct a full-scale thermal vacuum test to verify the thermal design and the analytical techniques used to develop the thermal mathematical models. Thermal vacuum test philosophy, test objectives configuration, test monitoring, environment simulation, vehicle test performance, and data correlation are discussed. Emphasis is placed on planning and execution of the thermal vacuum test with particular attention on problems encountered in conducting a test of this maguitude.

  19. Cold Vacuum Drying facility sanitary sewage collection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) sanitary sewage collection system. The sanitary sewage collection system provides collection and storage of effluents and raw sewage from the CVDF to support the cold vacuum drying process. This system is comprised of a sanitary sewage holding tank and pipes for collection and transport of effluents to the sanitary sewage holding tank

  20. Vacuum system design and tritium inventory for the TFTR charge exchange diagnostic

    International Nuclear Information System (INIS)

    Medley, S.S.

    1979-05-01

    The charge exchange diagnostic for the TFTR is comprised of two analyzer systems which contain a total of twenty independent mass/energy analyzers and one diagnostic neutral beam tentatively rated at 80 keV, 15 A. The associated vacuum systems were analyzed using the Vacuum System Transient Simulator (VSTS) computer program which models the transient transport of multi-gas species through complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. In addition to providing improved design performance at reduced cost, the analysis yields estimates for the exchange of tritium from the torus to the diagnostic components and of the diagnostic working gases to the torus

  1. A remote joint system for large vacuum ducts

    International Nuclear Information System (INIS)

    Hagmann, D.B.; Coughlan, J.B.

    1983-01-01

    A large remote vacuum duct joining system has been developed for fusion machines that uses several two-jaw screwdriven clamps. The preferred location for clamp installation is inside the vacuum duct where access space is available for the actuating device. It also decreases space needed for handling operations exterior to the duct. The clamp system is unique in that it is low cost, applies force directly over the seal, permits leak testing to the seal annulus, is highly reliable, can be remotely replaced, and is usable on a variety of other applications

  2. Review of vacuum systems for x-ray lithography light sources

    International Nuclear Information System (INIS)

    Schuchman, J.C.

    1990-01-01

    This paper will review and give a status report on vacuum systems for X-Ray lithography light sources. It will include conventional machines and compact machines (machines using superconducting magnets). The vacuum systems will be described and compared with regard to basic machine parameters, pumping systems, types of pumps, chamber design and material, gauging and diagnostics, and machine performane. 23 refs., 8 figs., 1 tab

  3. Experimental research for vacuum gap breakdown in high voltage multi-pulse

    International Nuclear Information System (INIS)

    Huang Ziping; He Jialong; Chen Sifu; Deng Jianjun; Wang Liping

    2008-01-01

    Base on the breakdown theory of vacuum gaps, experiments have been done to find out the breakdown electric field intensities in high voltage single-and triple-pulse for 26 vacuum gaps with different shapes. The experimental results match up to the theory and confirm the effect of the pulse-number increase on the breakdown electric field intensity. The key point to decide the macroscopical breakdown electric field intensity of a vacuum gap has been pointed out with some advises about the design of a multi-pulse linear inductive accelerator's accelerate gap. (authors)

  4. Ion accelerators for space

    International Nuclear Information System (INIS)

    Slobodrian, R.J.; Potvin, L.

    1991-01-01

    The main purpose of the accelerators is to allow ion implantation in space stations and their neighborhoods. There are several applications of interest immediately useful in such environment: as ion engines and thrusters, as implanters for material science and for hardening of surfaces (relevant to improve resistance to micrometeorite bombardment of exposed external components), production of man made alloys, etc. The microgravity environment of space stations allows the production of substances (crystalline and amorphous) under conditions unknown on earth, leading to special materials. Ion implantation in situ of those materials would thus lead uninterruptedly to new substances. Accelerators for space require special design. On the one hand it is possible to forego vacuum systems simplifying the design and operation but, on the other hand, it is necessary to pay special attention to heat dissipation. Hence it is necessary to construct a simulator in vacuum to properly test prototypes under conditions prevailing in space

  5. Improved plasma accelerator

    Science.gov (United States)

    Cheng, D. Y.

    1971-01-01

    Converging, coaxial accelerator electrode configuration operates in vacuum as plasma gun. Plasma forms by periodic injections of high pressure gas that is ionized by electrical discharges. Deflagration mode of discharge provides acceleration, and converging contours of plasma gun provide focusing.

  6. A Wideroee pre-accelerator for the SuperHILAC

    International Nuclear Information System (INIS)

    Staples, J.; Alonso, J.; Behrsing, G.; Clark, D.; Grunder, H.; Olivier, M.; Spence, D.; Yourd, R.

    1976-01-01

    Plans to upgrade both the Bevatron vacuum system and the SuperHILAC ion sources and injectors have been formulated. A proposed new pre-accelerator based on an air-insulated Cockcroft-Walton and a Wideroee linac is presented

  7. Development of the vacuum system pressure responce analysis code PRAC

    International Nuclear Information System (INIS)

    Horie, Tomoyoshi; Kawasaki, Kouzou; Noshiroya, Shyoji; Koizumi, Jun-ichi.

    1985-03-01

    In this report, we show the method and numerical results of the vacuum system pressure responce analysis code. Since fusion apparatus is made up of many vacuum components, it is required to analyze pressure responce at any points of the system when vacuum system is designed or evaluated. For that purpose evaluating by theoretical solution is insufficient. Numerical analysis procedure such as finite difference method is usefull. In the PRAC code (Pressure Responce Analysis Code), pressure responce is obtained solving derivative equations which is obtained from the equilibrium relation of throughputs and contain the time derivative of pressure. As it considers both molecular and viscous flows, the coefficients of the equation depend on the pressure and the equations become non-linear. This non-linearity is treated as piece-wise linear within each time step. Verification of the code is performed for the simple problems. The agreement between numerical and theoretical solutions is good. To compare with the measured results, complicated model of gas puffing system is analyzed. The agreement is well for practical use. This code will be a useful analytical tool for designing and evaluating vacuum systems such as fusion apparatus. (author)

  8. Gravitational collapse and the vacuum energy

    International Nuclear Information System (INIS)

    Campos, M

    2014-01-01

    To explain the accelerated expansion of the universe, models with interacting dark components (dark energy and dark matter) have been considered recently in the literature. Generally, the dark energy component is physically interpreted as the vacuum energy of the all fields that fill the universe. As the other side of the same coin, the influence of the vacuum energy on the gravitational collapse is of great interest. We study such collapse adopting different parameterizations for the evolution of the vacuum energy. We discuss the homogeneous collapsing star fluid, that interacts with a vacuum energy component, using the stiff matter case as example. We conclude this work with a discussion of the Cahill-McVittie mass for the collapsed object.

  9. Vacuum brazing of OFE Copper-316L stainless steel transition joints without electroplating stainless steel part for application in particle accelerators

    International Nuclear Information System (INIS)

    Yadav, D.P.; Kumar, Abhay; Ganesh, P.

    2015-01-01

    Brazed transition Joints between OFE copper and type 316L austenitic stainless steel (SS) find extensive applications in particle accelerators all over the world. In contrast to excellent wettability of OFE copper, austenitic SS is well known for its poor wettability for BVAg-8 ( 72 Ag/ 28 Cu; melting point: 1052 K) braze filler metal (BFM). High surface wettability is believed to be necessary to drag molten BFM into the capillary gap between mating metallic surfaces. Therefore, the widely accepted practice for vacuum brazing of such transition joints involves electroplating of SS parts with nickel or copper to enhance its wettability. A recently concluded in-house study, involving Nb to Ni-plated 316L SS brazing, has demonstrated that satisfactory ingress of BFM into a capillary joint between two dissimilar metals is possible if the poor wettability of one of the mating surfaces is compensated by good wettability of its counterpart. In the light of these observations, the present study was undertaken to explicitly evaluate the requirement of electroplating the SS part for establishment of sound OFE copper-316L SS brazed joints suitable for service in ultra-high vacuum (UHV) of particle accelerators

  10. New baking system for the RFX vacuum vessel

    Energy Technology Data Exchange (ETDEWEB)

    Collarin, P.; Luchetta, A.; Sonato, P.; Toigo, V.; Zaccaria, P.; Zollino, G. [Universita di Padova (Italy)

    1996-12-31

    A heating system based on eddy currents has been developed for the vacuum vessel of the RFX Reversed Field Pinch device. After a testing phase, carried out at low power, the final power supply system has been designed and installed. It has been used during last year to bake out the vessel and the graphite first wall up to 320{degree}C. Recently the heating system has been completed with a control system that allows for baking sessions with an automatic control of the vacuum vessel temperature and for pulse sessions with a heated first wall. After the description of the preliminary analyses and tests, and of the main characteristics of the power supply and control systems, the experimental results of the baking sessions performed during last year are presented. 6 refs., 7 figs.

  11. New baking system for the RFX vacuum vessel

    International Nuclear Information System (INIS)

    Collarin, P.; Luchetta, A.; Sonato, P.; Toigo, V.; Zaccaria, P.; Zollino, G.

    1996-01-01

    A heating system based on eddy currents has been developed for the vacuum vessel of the RFX Reversed Field Pinch device. After a testing phase, carried out at low power, the final power supply system has been designed and installed. It has been used during last year to bake out the vessel and the graphite first wall up to 320 degree C. Recently the heating system has been completed with a control system that allows for baking sessions with an automatic control of the vacuum vessel temperature and for pulse sessions with a heated first wall. After the description of the preliminary analyses and tests, and of the main characteristics of the power supply and control systems, the experimental results of the baking sessions performed during last year are presented. 6 refs., 7 figs

  12. VEDs for charged particle accelerators: Indian scenario

    International Nuclear Information System (INIS)

    Bhandari, R.K.

    2012-01-01

    In the initial times after their invention, the charged particle accelerators have, primarily, been used for fundamental studies on nuclei and atoms. From the first modern accelerator, the cathode ray tube, used by J.J. Thomson for the discovery of electron, very recently the gigantic 27 km circumference Large Hadron Collider (LHC) is operational in the search of Higg's boson and related physics issues. Particle accelerators have emerged as powerful microscopes for investigating the finest details of cells, genes, molecules, atoms, protons, neutrons, muons, electrons, quarks and, possibly, still undiscovered even more fundamental constituents of the universe, such as dark matter and dark energy. Several noble prize winning discoveries have been made using accelerators. Accelerators are now being used in a wide area of industrial and medical applications. They are used for the production of radioisotopes for medical imaging, cancer therapy, food sterilization, treatment of waste water, sterilization of medical equipment, material modification, mass spectroscopy, cargo scanning, fabrication of semiconductors etc. Ongoing effort towards the development of accelerators with megawatt beam power is showing hope for a cleaner source of nuclear energy and treatment of nuclear waste. Several tens of thousands of accelerators are presently operational in the world for basic research and applications. Development of new accelerators has several times been driven by new technologies and materials and sometimes they have driven the technological developments towards cutting edge. Some examples are ultra-high vacuum in large volumes, superfluid helium in cryogenics, cryocoolers, superconducting magnets and RF cavities, high power vacuum electronic devices, global control systems, superfast computing and communication networks, giant data storage/processing systems etc. India has been pursuing a fairly robust programme of accelerator development at various institutions. It

  13. Upgrading the control system for the Accelerators at the Svedberg Laboratory

    International Nuclear Information System (INIS)

    Gajewski, K.J.; Thuresson, L.; Johansson, O.

    1992-01-01

    Two accelerators at The Svedberg Laboratory in Uppsala, the Gustaf Werner cyclotron and the CELSIUS ring, will get a new control system. At present both the cyclotron and the ring have their own control systems based on S99 and PDP-11 minicomputers respectively. There are also a number of subsystems which are controlled separately from the stand-alone PC based consoles (ECR ion source, electron cooler, vacuum system). The goal of the rejuvenation is to integrate all existing control systems and provide the new system with an uniform operators interface based on workstations. The obsolete S99 microcomputers will be substituted with a VME system and all subsystems will be connected to the Ethernet. The upgrade strategy enabling the transformation of the system without any long shut-down period is discussed. Hardware and software planned for the upgrade is presented together with a discussion of expected problems. (author)

  14. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    Science.gov (United States)

    Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava

    2015-03-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  15. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    Energy Technology Data Exchange (ETDEWEB)

    Roy, Anindya, E-mail: r-ani@vecc.gov.in; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava [Variable Energy Cyclotron Centre, 1/AF Bidhan Nagar, Kolkata 700064 (India)

    2015-03-15

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  16. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    International Nuclear Information System (INIS)

    Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava

    2015-01-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system

  17. Cw operation of the FMIT RFQ accelerator

    International Nuclear Information System (INIS)

    Cornelius, W.D.

    1985-01-01

    Recently, we have achieved reliable cw operation of the Fusion Materials Irradiation Test (FMIT) radio-frequency quadrupole (RFQ) accelerator. In addition to the operational experiences in achieving this status, some of the modifications of the vacuum system, cooling system, and rf structure are discussed. Preliminary beam-characterization results are presented. 10 refs., 8 figs

  18. Systems and methods for analyzing liquids under vacuum

    Science.gov (United States)

    Yu, Xiao-Ying; Yang, Li; Cowin, James P.; Iedema, Martin J.; Zhu, Zihua

    2013-10-15

    Systems and methods for supporting a liquid against a vacuum pressure in a chamber can enable analysis of the liquid surface using vacuum-based chemical analysis instruments. No electrical or fluid connections are required to pass through the chamber walls. The systems can include a reservoir, a pump, and a liquid flow path. The reservoir contains a liquid-phase sample. The pump drives flow of the sample from the reservoir, through the liquid flow path, and back to the reservoir. The flow of the sample is not substantially driven by a differential between pressures inside and outside of the liquid flow path. An aperture in the liquid flow path exposes a stable portion of the liquid-phase sample to the vacuum pressure within the chamber. The radius, or size, of the aperture is less than or equal to a critical value required to support a meniscus of the liquid-phase sample by surface tension.

  19. Comparison of cold and warm vacuum systems for intersecting storage rings

    International Nuclear Information System (INIS)

    Halama, H.J.; Herrera, J.C.

    1975-01-01

    In storage rings employing superconducting magnets, the use of a cold bore as a cryopump appears, at first glance, as simple and economical. Since the selection of a cold or warm vacuum system has far-reaching implications on the basic design, each system is considered in some detail. The theoretical and practical limitations imposed on the maximum beam current by the gas desorption from the chamber walls are discussed. A realistic design of a cold vacuum chamber is developed and then compared with the proposed warm ISABELLE vacuum system. The comparison shows that the warm approach is preferable. (U.S.)

  20. Vacuum Technology

    Energy Technology Data Exchange (ETDEWEB)

    Biltoft, P J

    2004-10-15

    The environmental condition called vacuum is created any time the pressure of a gas is reduced compared to atmospheric pressure. On earth we typically create a vacuum by connecting a pump capable of moving gas to a relatively leak free vessel. Through operation of the gas pump the number of gas molecules per unit volume is decreased within the vessel. As soon as one creates a vacuum natural forces (in this case entropy) work to restore equilibrium pressure; the practical effect of this is that gas molecules attempt to enter the evacuated space by any means possible. It is useful to think of vacuum in terms of a gas at a pressure below atmospheric pressure. In even the best vacuum vessels ever created there are approximately 3,500,000 molecules of gas per cubic meter of volume remaining inside the vessel. The lowest pressure environment known is in interstellar space where there are approximately four molecules of gas per cubic meter. Researchers are currently developing vacuum technology components (pumps, gauges, valves, etc.) using micro electro mechanical systems (MEMS) technology. Miniature vacuum components and systems will open the possibility for significant savings in energy cost and will open the doors to advances in electronics, manufacturing and semiconductor fabrication. In conclusion, an understanding of the basic principles of vacuum technology as presented in this summary is essential for the successful execution of all projects that involve vacuum technology. Using the principles described above, a practitioner of vacuum technology can design a vacuum system that will achieve the project requirements.

  1. Acceleration of tritons with a compact cyclotron

    International Nuclear Information System (INIS)

    Wegmann, H.; Huenges, E.; Muthig, H.; Moringa, H.

    1981-01-01

    With the compact cyclotron at the Faculty of Physics of the Technical University of Munich, tritons have been accelerated to an energy of 7 MeV. A safe and reliable operation of the gas supply for the ion source was obtained by a new tritium storage system. A quantity of 1500 Ci tritium is stored by two special Zr-Al getter pumps in a non-gaseous phase. The tritium can be released in well-defined amounts by heating the getter material. During triton acceleration the pressure in the cyclotron vacuum chamber is maintained only by a large titanium sputter-ion pump, thus forming a closed vacuum system without any exhaust of tritium contaminated gas. Any tritium contaminations in the air can be detected by an extremely sensitive tritium monitoring system. The triton beam with a maximum intensity of 30 μA has been used so far to produce neutron-rich radioisotopes such as 28 Mg, 43 K, or 72 Zn, which are successfully applied in tracer techniques in the studies of biological systems. (orig.)

  2. Preliminary test of vacuum system of SPring-8 synchrotron

    International Nuclear Information System (INIS)

    Otsuka, Hideo; Yoneyama, Katsuji; Shimada, Taihei

    1992-01-01

    In this report, on the several points which it is desirable to be confirmed beforehand when the vacuum system of the synchrotron is designed, the results of the test by making the vacuum system for one normal cell simulating the actual machine are reported. Further by making three types of sample ducts, the ordinary type of 1.65 mm thickness, the rib-reinforced type of 0.3 mm thickness and bellows structure, the rate of released gas and the effect to eddy current were examined, for the purpose of taking the countermeasures to the eddy current accompanying the synchrotron operation. The mockup of the normal cell was composed of a duct of 10 m length, two ion pumps of 20 l/s, and a turbo molecular pump of 50 l/s, and the material of the ducts is SUS316L, and the sectional form is elliptic of 72 x 34. In the vacuum test of the normal cell, the exhaust characteristics at the time of rise and pressure distribution were verified. The measurement of the rate of released gas in the ducts and the measurement of current and voltage induced in the ducts are reported. The sufficient performance can be expected with the exhaust system used, and the time required for the rise of the vacuum system was clarified. (K.I.)

  3. Analysis of an innovative solar water desalination system using gravity induced vacuum

    International Nuclear Information System (INIS)

    Ayhan, T.; Al-Madani, H.

    2007-01-01

    This study presents the theoretical analysis, design and appropriate models of a new desalination system using gravity induced vacuum. The system utilizes natural means (gravity and atmospheric pressure) to create a vacuum under which water can be rapidly evaporated at much lower temperatures with less energy than conventional techniques. This technique is developed to overcome water storage, in the areas where good solar radiation (or waste heat sources) and sea water (or waste water sources). The developed system consists of an evaporator connected to condenser by means of a vacuum tank. The vapour produced in the evaporator is driven to condenser through the vacuum tank, where it condenses and collected as a product. Vacuum equivalent to 7 kPa (abs) or less can be created depending on ambient temperature of Bahrain climatic conditions. The effect of various operating conditions, namely water levels in condensation and evaporating columns on the system performance were studied. The theoretical analysis and preliminary experimental results show that the performance of this system depends on the condensation temperature

  4. Distributed remote temperature monitoring system for INDUS-2 vacuum chambers

    International Nuclear Information System (INIS)

    Bhange, N.J.; Gothwal, P.; Fatnani, P.; Shukla, S.K.

    2011-01-01

    Indus-2, a 2.5 GeV Synchrotron Radiation Source (SRS) at Indore has a large vacuum system. The vacuum envelope of Indus-2 ring comprises of 16 dipole chambers as vital parts. Each chamber has 4 photon absorbers and three beam line ports blanked with end flanges. Temperature monitoring of critical vacuum components during operation of Indus-2 ring is an important requirement. The paper discusses a distributed, 160 channel remote temperature monitoring system developed and deployed for this purpose using microcontroller based, modular Temperature Monitoring Units (TMU). The cabling has been extensively minimized using RS485 system and keeping trip relay contacts of all units in series. For ensuring proper signal conditioning of thermocouple outputs (K-type) and successful operation over RS485 bus, many precautions were taken considering the close proximity to the storage ring. We also discuss the software for vacuum chamber temperature monitoring and safety system. The software developed using LabVIEW, has important features like modularity, client-server architecture, local and global database logging, alarms and trips, event and error logging, provision of various important configurations, communications handling etc. (author)

  5. Application of programmable controllers to vacuum system interlocks

    International Nuclear Information System (INIS)

    Lee, G.; Moore, D.

    1979-11-01

    This paper describes the Doublet III Vacuum Control System in which all input signals and output loads are connected to a programmable controller (PC) for logical interfacing. Input signals derived from CAMAC, control panels, limit switches, etc., are implemented as output signals to CAMAC, vacuum valves, pump motors, etc., according to a logic program stored in the PC memory. The memory can be easily programmed by anyone familar with either Boolean algebra or relay-ladder network diagrams. The program data is entered with the aid of a calculator like, keyboard instrument with LED readout displays. The PC system contains a 1024 word RAM memory with a battery backup system to provide 72 hours protection of contents in case of power failure

  6. Vacuum system for the tokamak fusion test reactor (TFTR)

    International Nuclear Information System (INIS)

    Lange, W.J.; Green, D.; Sink, D.A.

    1976-01-01

    The vacuum system for TFTR is described. Insofar as possible, conventional and ultrahigh vacuum (UHV) components and technology will be employed. Subassemblies will be prebaked in vacuum to reduce subsequent outgassing, and assembly will employ TIG welding and metal gaskets. It is not anticipated that the totally assembled torus with its numerous diagnostic appendages will be baked in situ to a high temperature, however a lower bakeout temperature (approximately 250 0 C) is under consideration. Final vacuum conditioning will be performed using discharge cleaning to obtain a specific outgassing rate of less than or = to 10 -10 Torr liter/sec cm 2 hydrogen isotopes and less than or = to 10 -12 Torr liter/sec cm 2 of other gases, and a base pressure of less than or = to 5 x 10 -8 Torr

  7. Investigation of Vacuum Insulator Surface Dielectric Strength with Nanosecond Pulses

    International Nuclear Information System (INIS)

    Nunnally, W.C.; Krogh, M.; Williams, C.; Trimble, D.; Sampayan, S.; Caporaso, G.

    2003-01-01

    The maximum vacuum insulator surface dielectric strength determines the acceleration electric field gradient possible in a short pulse accelerator. Previous work has indicated that higher electric field strengths along the insulator-vacuum interface might be obtained as the pulse duration is decreased. In this work, a 250 kV, single ns wide impulse source was applied to small diameter, segmented insulators samples in a vacuum to evaluate the multi-layer surface dielectric strength of the sample construction. Resonances in the low inductance test geometry were used to obtain unipolar, pulsed electric fields in excess of 100 MV/m on the insulator surface. The sample construction, experimental arrangement and experimental results are presented for the initial data in this work. Modeling of the multi-layer structure is discussed and methods of improving insulator surface dielectric strength in a vacuum are proposed

  8. System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System

    International Nuclear Information System (INIS)

    ANGLESEY, M.O.

    2000-01-01

    The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items

  9. ITER cryostat main chamber and vacuum vessel pressure suppression system design

    International Nuclear Information System (INIS)

    Ito, Akira; Nakahira, Masataka; Takahashi, Hiroyuki; Tada, Eisuke; Nakashima, Yoshitane; Ueno, Osamu

    1999-03-01

    Design of Cryostat Main Chamber and Vacuum Vessel Pressure Suppression System (VVPS) of International Thermonuclear Experimental Reactor (ITER) has been conducted. The cryostat is a cylindrical vessel that includes in-vessel component such as vacuum vessel, superconducting toroidal coils and poloidal coils. This cryostat provides the adiabatic vacuum about 10 -4 Pa for the superconducting coils operating at 4 K and forms the second confinement barrier to tritium. The adiabatic vacuum is to reduce thermal loads applied to the superconducting coils and their supports so as to keep their temperature 4 K. The VVPS consists of a suppression tank located under the lower bio-shield and 4 relief pipes to connect the vacuum vessel and the suppression tank. The VVPS is to keep the maximum pressure rise of the vacuum vessel below the design value of 0.5 MPa in case of the in-vessel LOCA (water spillage from in-vessel component). The spilled water and steam are lead to the suppression tank through the relief pipes when the internal pressure of vacuum vessel is over 0.2 MPa, and then the internal pressure is kept below 0.5 MPa. This report summarizes the structural design of the cryostat main chamber and pressure suppression system, together with their fabrication and installation. (author)

  10. ITER cryostat main chamber and vacuum vessel pressure suppression system design

    Energy Technology Data Exchange (ETDEWEB)

    Ito, Akira; Nakahira, Masataka; Takahashi, Hiroyuki; Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nakashima, Yoshitane; Ueno, Osamu

    1999-03-01

    Design of Cryostat Main Chamber and Vacuum Vessel Pressure Suppression System (VVPS) of International Thermonuclear Experimental Reactor (ITER) has been conducted. The cryostat is a cylindrical vessel that includes in-vessel component such as vacuum vessel, superconducting toroidal coils and poloidal coils. This cryostat provides the adiabatic vacuum about 10{sup -4} Pa for the superconducting coils operating at 4 K and forms the second confinement barrier to tritium. The adiabatic vacuum is to reduce thermal loads applied to the superconducting coils and their supports so as to keep their temperature 4 K. The VVPS consists of a suppression tank located under the lower bio-shield and 4 relief pipes to connect the vacuum vessel and the suppression tank. The VVPS is to keep the maximum pressure rise of the vacuum vessel below the design value of 0.5 MPa in case of the in-vessel LOCA (water spillage from in-vessel component). The spilled water and steam are lead to the suppression tank through the relief pipes when the internal pressure of vacuum vessel is over 0.2 MPa, and then the internal pressure is kept below 0.5 MPa. This report summarizes the structural design of the cryostat main chamber and pressure suppression system, together with their fabrication and installation. (author)

  11. Vacuum system design for the PEP-II B Factory High-Energy Ring

    International Nuclear Information System (INIS)

    Perkins, C.; Bostic, D.; Daly, E.

    1994-06-01

    The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal design and vacuum requirements are particularly challenging in PEP-II due to high stored beam currents up to 3.0 amps in 1658 bunches. The vacuum chambers for the HER arcs are fabricated by electron beam welding extruded copper sections up to 6 m long. Design of these chambers and the vacuum PumPing configuration is described with results from vacuum and thermal analyses

  12. Operating experiences on the co-generation system (CGS) as an uninterruptible power source (UPS) for the super-sized accelerator facility, RIBF of RIKEN

    International Nuclear Information System (INIS)

    Fujinawa, Tadashi; Yano, Yasushige

    2011-01-01

    The RI Beam Factory (RIBF) of RIKEN Nishina Center for Accelerator-Based Science, which succeeded in extracting first beam on December 28th 2006 as scheduled, is currently conducting nuclear physics experiments. The RIBF has six accelerators, one of which is the world's biggest and most powerful superconducting ring cyclotron (SRC). The accelerators require not only a huge amount of electricity but also a reliable power supply for the He-cryogenic system, vacuum system and superconducting magnet systems. For this purpose, the co-generation system (CGS) was introduced. A gas turbine generates 6.5 MW of power from liquid natural gas (LNG) and supplies it to the systems mentioned above as an uninterruptible power source (UPS). By utilizing gas heat exhaust from the gas turbine, the CGS will also supply cooled water to the cooling system of the RIBF accelerators as well as to the air-conditioning system for the bending. The CGS plant was completed on the 1st floor of the RIBF accelerator building and it began operating in April 2003. This paper covers the merits and demerits. (author)

  13. PTC-6 vacuum system: WallWaler trademark Blastrac reg-sign shot blast cleaning system

    International Nuclear Information System (INIS)

    1998-02-01

    The LTC Americas, Inc. wall decontamination technology consisted of two pneumatic hand-held tools: (1) a roto-peen scaler that used star cutters and (2) a 3-piston hammer with reciprocating bits. The hand-held tools were used in conjunction with the LTC PTC-6 vacuum system which captured dust and debris as the wall decontamination took place. Recommendations for improved worker safety and health during use of the PTC-6 vacuum system with hand-held tools include: (1) keeping all hoses and lines as orderly as possible in compliance with good housekeeping requirements; (2) ergonomic training to include techniques in lifting, bending, stooping, twisting, etc.; (3) use of a clamping system to hold hoses to the vacuum system; (4) a safety line on the air line connections; (5) use of a mechanical lifting system for waste drum removal; and (6) the use of ergonomically designed tools

  14. TFTR ultrahigh-vacuum pumping system incorporating mercury diffusion pumps

    International Nuclear Information System (INIS)

    Sink, D.A.; Sniderman, M.

    1976-06-01

    The TFTR vacuum vessel will have a system of four 61 cm diameter mercury diffusion pumps to provide a base pressure in the 10 -8 to 10 -9 Torr range as well as a low impurity level within the vessel. The system, called the Torus Vacuum Pumping System (TVPS), will be employed with the aid of an occasional 250 0 C bakeout in situ as well as periodic applications of aggressive discharge cleaning. The TVPS is an ultrahigh-vacuum (UHV) system using no elastomers as well as being a closed system with respect to tritium or any tritiated gases. The backing system employing approximately 75 all-metal isolation valves is designed with the features of redundancy and flexibility employed in a variety of ways to meet the fundamental requirements and functions enumerated for the TVPS. Since the design, is one which is a modification of the conceptual design of the TVPS, those features which have changed are discussed. Calculations are presented for the major performance parameters anticipated for the TVPS and include conductances, effective pumping speeds, base pressures, operating parameters, getter pump parameters, and calculations of time constants associated with leak checking. Modifications in the vacuum pumping system for the guard regions on the twelve bellows sections are presented so that it is compatible with the main TVPS. The bellows pumping system consists of a mechanical pump unit, a zirconium aluminum getter pump unit and a residual gas analyzer. The control and management of the TVPS is described with particular attention given to providing both manual and automatic control at a local station and at the TFTR Central Control. Such operations as testing, maintenance, leak checking, startup, bakeout, and various other operations are considered in some detail. Various aspects related to normal pulsing, discharge cleaning, non-tritium operations and tritium operations are also taken into consideration. A cost estimate is presented

  15. Accelerator-timing system

    International Nuclear Information System (INIS)

    Timmer, E.; Heine, E.

    1985-01-01

    Along the NIKHEF accelerator in Amsterdam (Netherlands), at several places a signal is needed for the sychronisation of all devices with the acceleration process. In this report, basic principles and arrangements of this timing system are described

  16. Vacuum system for HIMAC synchrotrons

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sudou, M.; Sato, K.

    1994-01-01

    HIMAC synchrotrons are now under construction, which require vacuum chambers of large aperture and high vacuum of about 10 -9 torr. Wide thin wall vacuum chamber of 0.3 mm thickness reinforced with ribs has been developed as the chamber at dipole magnet. We have just now started to evacuate the lower ring. The obtained average value was about 5x10 -8 torr with turbo-molecular and sputter ion pumps, and 1.1x10 -9 torr after baking. (author)

  17. Rotary bayonets for cryogenic and vacuum service

    International Nuclear Information System (INIS)

    Rucinski, R.A.; Dixon, K.D.; Krasa, R.; Krempetz, K.J.; Mulholland, G.T.; Trotter, G.R.; Urbin, J.B.

    1993-07-01

    Rotary bayonets were designed, tested, and installed for liquid nitrogen, liquid argon, and vacuum service. This paper will present the design, testing, and service record for two sizes of vacuum jacketed cryogenic rotary bayonets and two sizes of vacuum service rotary bayonets. Materials used in construction provide electrical isolation across the bayonet joint. The joint permits 360 degrees of rotation between the male and female pipe sections while maintaining integrity of service. Assemblies using three such joints were built to allow end connection points to be translated through at least 1 meter of horizontal travel while kept in service. Vacuum jacketed sizes built in-house at Fermi National Accelerator Laboratory are 1-1/2 in. inner pipe size, 3 in. vacuum jacket, and 4 in. inner pipe size, 6 in. vacuum jacket The single wall vacuum service bayonets are in 4 in. and 6 in. pipe sizes. The bayonets have successfully been in active service for over one year

  18. Rotary bayonets for cryogenic and vacuum service

    International Nuclear Information System (INIS)

    Rucinski, R.A.; Dixon, K.D.; Krasa, R.; Krempetz, K.J.; Mulholland, G.T.; Trotter, G.R.; Urbin, J.B.

    1994-01-01

    Rotary bayonets were designed, tested, and installed for liquid nitrogen, liquid argon, and vacuum service. This paper will present the design, testing, and service record for two sizes of vacuum jacketed cryogenic rotary bayonets and two sizes of vacuum service rotary bayonets. Materials used in construction provide electrical isolation across the bayonet joint. The joint permits 360 degrees of rotation between the male and female pipe sections while maintaining integrity of service. Assemblies using three such joints were built to allow end connection points to be translated through at least 1 meter of horizontal travel while kept in service. Vacuum jacketed sizes built in-house at Fermi National Accelerator Laboratory are 1 1/2 inches inner pipe size, 3 inches vacuum jacket, and 4 inches inner pipe size, 6 inches vacuum jacket. The single wall vacuum service bayonets are in 4 inch and 6 inch pipe sizes. The bayonets have successfully been in active service for over one year

  19. Quantum effects in accelerator physics

    International Nuclear Information System (INIS)

    Leinaas, J.M.

    1991-08-01

    Quantum effects for electrons in a storage ring are discussed, in particular the polarization effect due to spin flip synchrotron radiation. The electrons are treated as a simple quantum mechnical two-level system coupled to the orbital motion and the radiation field. The excitations of the spin system are then related to the Unruh effect, i.e. the effect that an accelerated radiation detector is thermally excited by vacuum fluctuations. 24 refs., 2 figs

  20. The design and structure of the ultra-high vacuum system of HIRFL-CSR

    International Nuclear Information System (INIS)

    Yang Xiaotian; Zhang Junhui; Zhang Xinjun; Meng Jun; Zhan Wenlong

    2001-01-01

    To minimize the beam loss due to charge exchange of very heavy ions with the residual gas molecules, ultra-high vacuum of 6x10 -9 Pa is required for the HIRFL-CSR facility, which is the lowest pressure in a large vacuum system in China up to now. The total length of the system is about 450 meters and the total inner surface is about 263 square meters. More than 500 standard vacuum components are needed and more than 400 different chambers have to be manufactured. A lot of researches have been down to try to find out the experiences to obtain the required pressure. In this article the following contents are described: the layout of the system; the structure of main vacuum chambers; the treatment method to reduce the outgassing rate of the chamber wall surfaces; vacuum equipment; pressure distribution and the progress of the system

  1. Vacuum system problems of EBT: a steady-state fusion experiment

    International Nuclear Information System (INIS)

    Livesey, R.L.

    1981-01-01

    Many of the vacuum problems faced by EBT will soon be shared by other plasma devices as high-power microwave systems and long pulse lengths become more common. The solutions used on EBT (such as the raised lip with elastomer seal) are not unique; however, experience has shown that microwave-compatible designs must be carefully thought out. All details of the vacuum must be carefully thought out. All details of the vacuum must be carefully screened in advance to insure that microwaves do not leak into pumps or diagnostics where they can cause major damage. Sputter coating, which even now is noticeably present in most pulsed plasma systems, becomes much worse as systems approach steady state. And finally, radiation degradation of components which is presently a minor problem will become significant on high-power microwave-fed devices, such as EBT-P

  2. Vacuum System and Modeling for the Materials Plasma Exposure Experiment

    International Nuclear Information System (INIS)

    Lumsdaine, Arnold; Meitner, Steve; Graves, Van; Bradley, Craig; Stone, Chris

    2017-01-01

    Understanding the science of plasma-material interactions (PMI) is essential for the future development of fusion facilities. The design of divertors and first walls for the next generation of long-pulse fusion facilities, such as a Fusion Nuclear Science Facility (FNSF) or a DEMO, requires significant PMI research and development. In order to meet this need, a new linear plasma facility, the Materials Plasma Exposure Experiment (MPEX) is proposed, which will produce divertor relevant plasma conditions for these next generation facilities. The device will be capable of handling low activation irradiated samples and be able to remove and replace samples without breaking vacuum. A Target Exchange Chamber (TEC) which can be disconnected from the high field environment in order to perform in-situ diagnostics is planned for the facility as well. The vacuum system for MPEX must be carefully designed in order to meet the requirements of the different heating systems, and to provide conditions at the target similar to those expected in a divertor. An automated coupling-decoupling (“autocoupler”) system is designed to create a high vacuum seal, and will allow the TEC to be disconnected without breaking vacuum in either the TEC or the primary plasma materials interaction chamber. This autocoupler, which can be actuated remotely in the presence of the high magnetic fields, has been designed and prototyped, and shows robustness in a variety of conditions. The vacuum system has been modeled using a simplified finite element analysis, and indicates that the design goals for the pressures in key regions of the facility are achievable.

  3. Ultra high vacuum system for Isabelle full cell

    International Nuclear Information System (INIS)

    Skelton, R.; Briggs, J.; Chou, T.S.; Foerster, C.; Stattel, P.

    1979-01-01

    A vacuum system consisting of a 40 m long 8.8 cm diameter stainless steel tube, pumped by 7 pumping stations, has been assembled using automatic welding methods. All components have been fired at 950 0 C in a vacuum furnace at a pressure -4 Torr. Each pumping station contains a Ti-sublimator, a 30 liter/s ion pump and an UHV gauge. After assembly, the entire system was baked out at 250 0 C for 24 hours. A pressure -11 Torr was reached after titanium flash. Surface treatment of stainless for 10 -11 Torr operation, bake out and conditioning cycle to read 1 x 10 -11 Torr, and leak checking at low pressures are discussed

  4. Charged-particle acceleration through laser irradiation of thin foils at Prague Asterix Laser System

    International Nuclear Information System (INIS)

    Torrisi, Lorenzo; Cutroneo, Maria; Cavallaro, Salvatore; Musumeci, Paolo; Calcagno, Lucia; Wolowski, Jerzy; Rosinski, Marcin; Zaras-Szydlowska, Agnieszka; Ullschmied, Jiri; Krousky, Eduard; Pfeifer, Miroslav; Skala, Jiri; Velyhan, Andreiy

    2014-01-01

    Thin foils, 0.5–50 μm in thickness, have been irradiated in vacuum at Prague Asterix Laser System in Prague using 10 15–16  W cm −2 laser intensity, 1315 nm wavelength, 300 ps pulse duration and different focal positions. Produced plasmas from metals and polymers films have been monitored in the forward and backward directions. Ion and electron accelerations have been investigated by using Thomson parabola spectrometer, x-ray streak camera, ion collectors and SiC semiconductor detectors, the latter employed in time-of-flight configuration. Ion acceleration up to about 3 MeV per charge state was measured in the forward direction. Ion and electron emissions were detected at different angles as a function of the irradiation conditions. (paper)

  5. Complex of electrostatic accelerators for simulation and diagnostics of radiation damage

    International Nuclear Information System (INIS)

    Antuf'ev, Yu.P.; Belyaev, V.Kh.; Vergunov, A.D.

    1983-01-01

    The installation for simulation and diagnostics of radiation damage of materials is described. The installation consists of two electrostatic accelerators of vertical type for 5 MV and horizontal type for 800 kV. The accelerating complex ensures accelerated ion beam production in the independent operation regime as well as in the two beams target simultaneous irradiation regime, energy range of accelerated single-charged ions is 80 keV ... 5 MeV, homogeneity is better than +-0.05%. Oilless vacuum pumping out system is realized at the accelerating complex

  6. Linear induction accelerator

    Science.gov (United States)

    Buttram, M.T.; Ginn, J.W.

    1988-06-21

    A linear induction accelerator includes a plurality of adder cavities arranged in a series and provided in a structure which is evacuated so that a vacuum inductance is provided between each adder cavity and the structure. An energy storage system for the adder cavities includes a pulsed current source and a respective plurality of bipolar converting networks connected thereto. The bipolar high-voltage, high-repetition-rate square pulse train sets and resets the cavities. 4 figs.

  7. Concerning the maximum energy of ions accelerated at the front of a relativistic electron cloud expanding into vacuum

    International Nuclear Information System (INIS)

    Bulanov, S.V.; Esirkepov, T.Zh.; Koga, J.; Tajima, T.; Farina, D.

    2004-01-01

    Results of particle-in-cell simulations are presented that demonstrate characteristic interaction regimes of high-power laser radiation with plasma. It is shown that the maximum energy of fast ions can substantially exceed the electron energy. A theoretical model is proposed of ion acceleration at the front of a relativistic electron cloud expanding into vacuum in the regime of strong charge separation. The model describes the electric field structure and the dynamics of fast ions inside the electron cloud. The maximum energy the ions can gain at the front of the expanding electron cloud is found

  8. Vacuum Simulations in High Energy Accelerators and Distribution Properties of Continuous and Discrete Particle Motions

    CERN Document Server

    Aichinger, Ida; Kersevan, Roberto

    The underlying thesis on mathematical simulation methods in application and theory is structured into three parts. The first part sets up a mathematical model capable of predicting the performance and operation of an accelerator’s vacuum system based on analytical methods. A coupled species-balance equation system describes the distribution of the gas dynamics in an ultra-high vacuum system considering impacts of conductance limitations, beam induced effects (ion-, electron-, and photon-induced de- sorption), thermal outgassing and sticking probabilities of the chamber materials. A new solving algorithm based on sparse matrix representations, is introduced and presents a closed form solution of the equation system. The model is implemented in a Python environment, named PyVasco, and is supported by a graphical user interface to make it easy available for everyone. A sensitivity analysis, a cross-check with the Test-Particle Monte Carlo simulation program Molflow+ and a comparison of the simulation results t...

  9. Upgrading of TARN-II vacuum system

    International Nuclear Information System (INIS)

    Chida, K.; Arakaki, Y.; Yoshizawa, M.; Tomizawa, M.; Tanabe, T.; Katayama, I.

    1994-01-01

    Ion pumps and titanium getter pumps have been increased nearly twice in the TARN-II. The pumping speed per unit length is now improved up to 2/3 times that of TARN-I. An average vacuum pressure of 10 -11 Torr order has been achieved at beam time. Performance of the system after the upgrading is reported. (author)

  10. APS storage ring vacuum system performance

    International Nuclear Information System (INIS)

    Noonan, J.R.; Gagliano, J.; Goeppner, G.A.

    1997-01-01

    The Advanced Photon Source (APS) storage ring was designed to operated with 7-GeV, 100-mA positron beam with lifetimes > 20 hours. The lifetime is limited by residual gas scattering and Touschek scattering at this time. Photon-stimulated desorption and microwave power in the rf cavities are the main gas loads. Comparison of actual system gas loads and design calculations will be given. In addition, several special features of the storage ring vacuum system will be presented

  11. Energy dissipation on ion-accelerator grids during high-voltage breakdown

    International Nuclear Information System (INIS)

    Menon, M.M.; Ponte, N.S.

    1981-01-01

    The effects of stored energy in the system capacitance across the accelerator grids during high voltage vacuum breakdown are examined. Measurements were made of the current flow and the energy deposition on the grids during breakdown. It is shown that only a portion (less than or equal to 40 J) of the total stored energy (congruent to 100 J) is actually dissipated on the grids. Most of the energy is released during the formation phase of the vacuum arc and is deposited primarily on the most positive grid. Certain abnormal situations led to energy depositions of about 200 J on the grid, but the ion accelerator endured them without exhibiting any deterioration in performance

  12. Vacuum mechatronics first international workshop

    Energy Technology Data Exchange (ETDEWEB)

    Belinski, S.E.; Shirazi, M.; Hackwood, S.; Beni, G. (eds.) (California Univ., Santa Barbara, CA (USA))

    1989-01-01

    This report contains papers on the following topics: proposed epitaxial thin film growth in the ultra-vacuum of space; particle monitoring and control in vacuum processing equipment; electrostatic dust collector for use in vacuum systems; materials evaluation of an electrically noisy vacuum slip ring assembly; an overview of lubrication and associated materials for vacuum service; the usage of lubricants in a vacuum environment; guidelines and practical applications for lubrication in vacuum; recent development in leak detector and calibrator designs; the durability of ballscrews for ultrahigh vacuum; vacuum-compatible robot for self-contained manufacturing systems; the design, fabrication, and assembly of an advanced vacuum robotics system for space payload calibration; design criteria for mechanisms used in space; and concepts and requirements for semiconductor multiprocess integration in vacuum. These papers are indexed separately elsewhere.

  13. The fine art of preparing a vacuum

    CERN Multimedia

    2006-01-01

    The vacuum chambers, or beam pipes, of the LHC experiments are located right at the interface between the detectors and the accelerator, and are therefore crucial to the LHC project as a whole. In this domain, the ALICE and CMS experiments have just passed an important milestone, with the completion of the first of CMS's two end-cap vacuum chambers, together with the completion and bakeout of an 18-metre section of the ALICE vacuum chamber. These complex projects, for which CERN's AT/VAC Group is responsible, involved dozens of people over a number of years.

  14. Vacuum properties of TiZrV non-evaporable getter films [for LHC vacuum system

    CERN Document Server

    Benvenuti, Cristoforo; Costa-Pinto, P; Escudeiro-Santana, A; Hedley, T; Mongelluzzo, A; Ruzinov, V; Wevers, I

    2001-01-01

    Sputter-deposited thin films of TiZrV are fully activated after 24 h "in situ" heating at 180 degrees C. This activation temperature is the lowest of some 18 different getter coatings studied so far, and it allows the use of the getter thin film technology with aluminium alloy vacuum chambers, which cannot be baked at temperatures higher than 200 degrees C. An updated review is given of the most recent results obtained on TiZrV coatings, covering the following topics: influence of the elemental composition and crystal structure on activation temperature, discharge gas trapping and degassing, dependence of pumping speed and surface saturation capacity on film morphology, ageing consequent to activation-air-venting cycles and ultimate pressures. Furthermore, the results obtained when exposing a coated particle beam chamber to synchrotron radiation in a real accelerator environment (ESRF Grenoble) are presented and discussed. (13 refs).

  15. Vacuum Arc Ion Sources

    CERN Document Server

    Brown, I.

    2013-12-16

    The vacuum arc ion source has evolved into a more or less standard laboratory tool for the production of high-current beams of metal ions, and is now used in a number of different embodiments at many laboratories around the world. Applications include primarily ion implantation for material surface modification research, and good performance has been obtained for the injection of high-current beams of heavy-metal ions, in particular uranium, into particle accelerators. As the use of the source has grown, so also have the operational characteristics been improved in a variety of different ways. Here we review the principles, design, and performance of vacuum arc ion sources.

  16. Advanced accelerator research and development

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    Research and development on the Positron-Electron Project (PEP), the electron rings, the superconducting accelerator (ESCAR), and the superconductivity program are reported. Efforts relating to the proposed PEP include work on: (1) the injection system; (2) the rf system; (3) the main-ring bend magnets; (4) the magnet power supplies and controls; (5) alignment; (6) radiation and shielding; (7) the vacuum system; and (8) conventional facilities (utilities, etc.). Experimental and theoretical work continued on the development of suitably intense electron rings as vehicles for the collective acceleration of ions. The most difficult problem was found to be the longitudinal (negative mass) instability. Design work was begun for ESCAR (Experimental Superconducting Accelerating Ring), a small proton synchrotron and storage ring using superconducting magnets, which should aid in the design of future large superconducting facilities. Magnet development was largely directed toward the detailed design of the dipole units. A superconducting beam transport line was installed at the Bevatron. (PMA)

  17. Requirements and guidelines for NSLS experimental beam line vacuum systems: Revision A

    International Nuclear Information System (INIS)

    Foerster, C.; Halama, H.; Thomlinson, W.

    1986-10-01

    Requirements are provided for NSLS beam line front ends and vacuum interlocks. Guidelines are provided for UHV beam line vacuum systems, including materials, vacuum hardware (pumps, valves, and flanges), acoustic delay lines and beam line fast valves, instrumentation, fabrication and testing, and the NSLS cleaning facility. Also discussed are the design review for experimenters' equipment that would be connected to the NSLS and acceptance tests for any beam line to be connected with the ring vacuum. Also appended are a description of the acoustic delay line as well as the NSLS vacuum standards and NSLS procedures

  18. Monte Carlo method implemented in a finite element code with application to dynamic vacuum in particle accelerators

    CERN Document Server

    Garion, C

    2009-01-01

    Modern particle accelerators require UHV conditions during their operation. In the accelerating cavities, breakdowns can occur, releasing large amount of gas into the vacuum chamber. To determine the pressure profile along the cavity as a function of time, the time-dependent behaviour of the gas has to be simulated. To do that, it is useful to apply accurate three-dimensional method, such as Test Particles Monte Carlo. In this paper, a time-dependent Test Particles Monte Carlo is used. It has been implemented in a Finite Element code, CASTEM. The principle is to track a sample of molecules during time. The complex geometry of the cavities can be created either in the FE code or in a CAD software (CATIA in our case). The interface between the two softwares to export the geometry from CATIA to CASTEM is given. The algorithm of particle tracking for collisionless flow in the FE code is shown. Thermal outgassing, pumping surfaces and electron and/or ion stimulated desorption can all be generated as well as differ...

  19. EAST-AIA deployment under vacuum: Calibration of laser diagnostic system using computer vision

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yang, E-mail: yangyang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Song, Yuntao; Cheng, Yong; Feng, Hansheng; Wu, Zhenwei; Li, Yingying; Sun, Yongjun; Zheng, Lei [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Bruno, Vincent; Eric, Villedieu [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France)

    2016-11-15

    Highlights: • The first deployment of the EAST articulated inspection arm robot under vacuum is presented. • A computer vision based approach to measure the laser spot displacement is proposed. • An experiment on the real EAST tokamak is performed to validate the proposed measure approach, and the results shows that the measurement accuracy satisfies the requirement. - Abstract: For the operation of EAST tokamak, it is crucial to ensure that all the diagnostic systems are in the good condition in order to reflect the plasma status properly. However, most of the diagnostic systems are mounted inside the tokamak vacuum vessel, which makes them extremely difficult to maintain under high vacuum condition during the tokamak operation. Thanks to a system called EAST articulated inspection arm robot (EAST-AIA), the examination of these in-vessel diagnostic systems can be performed by an embedded camera carried by the robot. In this paper, a computer vision algorithm has been developed to calibrate a laser diagnostic system with the help of a monocular camera at the robot end. In order to estimate the displacement of the laser diagnostic system with respect to the vacuum vessel, several visual markers were attached to the inner wall. This experiment was conducted both on the EAST vacuum vessel mock-up and the real EAST tokamak under vacuum condition. As a result, the accuracy of the displacement measurement was within 3 mm under the current camera resolution, which satisfied the laser diagnostic system calibration.

  20. Development of a Modified Vacuum Cleaner for Lunar Surface Systems

    Science.gov (United States)

    Toon, Katherine P.; Lee, Steve A.; Edgerly, Rachel D.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) mission to expand space exploration will return humans to the Moon with the goal of maintaining a long-term presence. One challenge that NASA will face returning to the Moon is managing the lunar regolith found on the Moon's surface, which will collect on extravehicular activity (EVA) suits and other equipment. Based on the Apollo experience, the issues astronauts encountered with lunar regolith included eye/lung irritation, and various hardware failures (seals, screw threads, electrical connectors and fabric contamination), which were all related to inadequate lunar regolith mitigation. A vacuum cleaner capable of detaching, transferring, and efficiently capturing lunar regolith has been proposed as a method to mitigate the lunar regolith problem in the habitable environment on lunar surface. In order to develop this vacuum, a modified "off-the-shelf' vacuum cleaner will be used to determine detachment efficiency, vacuum requirements, and optimal cleaning techniques to ensure efficient dust removal in habitable lunar surfaces, EVA spacesuits, and air exchange volume. During the initial development of the Lunar Surface System vacuum cleaner, systematic testing was performed with varying flow rates on multiple surfaces (fabrics and metallics), atmospheric (14.7 psia) and reduced pressures (10.2 and 8.3 psia), different vacuum tool attachments, and several vacuum cleaning techniques in order to determine the performance requirements for the vacuum cleaner. The data recorded during testing was evaluated by calculating particulate removal, relative to the retained simulant on the tested surface. In addition, optical microscopy was used to determine particle size distribution retained on the surface. The scope of this paper is to explain the initial phase of vacuum cleaner development, including historical Apollo mission data, current state-of-the-art vacuum cleaner technology, and vacuum cleaner testing that has

  1. Review of Current Nuclear Vacuum System Technologies

    International Nuclear Information System (INIS)

    Carroll, M.; McCracken, J.; Shope, T.

    2003-01-01

    Nearly all industrial operations generate unwanted dust, particulate matter, and/or liquid wastes. Waste dust and particulates can be readily tracked to other work locations, and airborne particulates can be spread through ventilation systems to all locations within a building, and even vented outside the building - a serious concern for processes involving hazardous, radioactive, or nuclear materials. Several varieties of vacuum systems have been proposed and/or are commercially available for clean up of both solid and liquid hazardous and nuclear materials. A review of current technologies highlights both the advantages and disadvantages of the various systems, and demonstrates the need for a system designed to address issues specific to hazardous and nuclear material cleanup. A review of previous and current hazardous/nuclear material cleanup technologies is presented. From simple conventional vacuums modified for use in industrial operations, to systems specifically engineered for such purposes, the advantages and disadvantages are examined in light of the following criteria: minimal worker exposure; minimal secondary waste generation;reduced equipment maintenance and consumable parts; simplicity of design, yet fully compatible with all waste types; and ease of use. The work effort reviews past, existing and proposed technologies in light of such considerations. Accomplishments of selected systems are presented, including identified areas where technological improvements could be suggested

  2. Vacuum characteristics of the rf cavity for TRISTAN main ring

    International Nuclear Information System (INIS)

    Mizuno, H.; Akemoto, M.; Sakai, S.; Yamazaki, Y.; Higo, T.; Morozumi, Y.; Takata, K.

    1987-01-01

    In the TRISTAN main ring 52 accelerating units of alternating periodic structure (APS) are to be installed into the 6 straight sections around the Fuji, Tsukuba and Oho experimental areas. An accelerating unit which is 5365 mm long is composed of two 9 accelerating cell structures. At present (Jan. 1987) 32 units have been installed and under operation at a beam energy of 25 GeV. The remaining 20 units will be set up in this summer. To achieve the necessary beam life longer than 5 hours, the cavity sections should be pumped down to the pressure less than 5 X 10 -9 Torr with an operating RF power of 200 kW per each 9-cell cavity and the e+- beam. For this purpose a sufficient baking which is the most efficient method of reducing the outgassing rates of the parts of vacuum system is required for the APS cavity. A circulating water boiler system with electric heaters and a water pump was developed for the easy operation and maintenance of the RF vacuum system. The cavity unit is made of low-carbon steel S25C, and inner surface is electro-plated with copper of 100 μm thickness in a pyrophosphorous-acid bath. The area of inner surface and the volume of the cavity are about 18 M 2 and 1 m 3 , respectively. The unit is baked at 135 0 C by circulating 145 0 C hot water in the cooling channel. After the bake-out process for 24 hours the outgassing rate is dominated by the hydrogen permeation from the cooling water channel through the iron wall into the vacuum. to suppress this permeation, the anti-corrosion agent is added to the water by 5% in volume. All of the units were baked for 10 days at 135 0 C before they were installed into the straight sections

  3. Electron emission of cathode holder of vacuum diode of an intense electron-beam accelerator and its effect on the output voltage

    Directory of Open Access Journals (Sweden)

    Xin-Bing Cheng

    2011-04-01

    Full Text Available The vacuum diode which is used to generate relativistic electron beams is one of the most important parts of a pulsed-power modulator. In this paper, the electron emission of cathode holder of a vacuum diode and its effect on the output voltage is investigated by experiments on an intense electron-beam accelerator with 180 ns full width at half maximum and 200–500 kV output voltage. First, the field emission is analyzed and the electric field of the vacuum chamber is calculated. Then, the flatness of the output voltage is discussed before and after adding an insulation plate when a water load is used. It is found that the electron emission at the edges of the cathode holder is the main reason to cause the change of the flatness. Last, a piece of polyester film is used as a target to further show the electron emission of the cathode holder. This analysis shows that decreasing the electron emission of the cathode holder in such a pulse power modulator could be a good way to improve the quality of the output voltage.

  4. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B

    International Nuclear Information System (INIS)

    FOERSTER, C.

    1999-01-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of ∼ 1 x 10 -10 Torr without beam and ∼ 1 x 10 -9 Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware downstream of front ends. O-ring-sealed valves, if used, are not

  5. PTC-6 vacuum system: WallWalker{trademark} and Blastrac{reg_sign} shot blast cleaning system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The LTC Americas, Inc. wall decontamination technology consisted of two pneumatic hand-held tools: (1) a roto-peen scaler that used star cutters and (2) a 3-piston hammer with reciprocating bits. The hand-held tools were used in conjunction with the LTC PTC-6 vacuum system which captured dust and debris as the wall decontamination took place. Recommendations for improved worker safety and health during use of the PTC-6 vacuum system with hand-held tools include: (1) keeping all hoses and lines as orderly as possible in compliance with good housekeeping requirements; (2) ergonomic training to include techniques in lifting, bending, stooping, twisting, etc.; (3) use of a clamping system to hold hoses to the vacuum system; (4) a safety line on the air line connections; (5) use of a mechanical lifting system for waste drum removal; and (6) the use of ergonomically designed tools.

  6. Analysis of the steady-state operation of vacuum systems for fusion machines

    International Nuclear Information System (INIS)

    Roose, T.R.; Hoffman, M.A.; Carlson, G.A.

    1975-01-01

    A computer code named GASBAL was written to calculate the steady-state vacuum system performance of multi-chamber mirror machines as well as rather complex conventional multichamber vacuum systems. Application of the code, with some modifications, to the quasi-steady tokamak operating period should also be possible. Basically, GASBAL analyzes free molecular gas flow in a system consisting of a central chamber (the plasma chamber) connected by conductances to an arbitrary number of one- or two-chamber peripheral tanks. Each of the peripheral tanks may have vacuum pumping capability (pumping speed), sources of cold gas, and sources of energetic atoms. The central chamber may have actual vacuum pumping capability, as well as a plasma capable of ionizing injected atoms and impinging gas molecules and ''pumping'' them to a peripheral chamber. The GASBAL code was used in the preliminary design of a large mirror machine experiment--LLL's MX

  7. Charged particle accelerator

    International Nuclear Information System (INIS)

    Arakawa, Kazuo.

    1969-01-01

    An accelerator is disclosed having a device which permits the electrodes of an accelerator tube to be readily conditioned in an uncomplicated manner before commencing operation. In particle accelerators, it is necessary to condition the accelerator electrodes before a stable high voltage can be applied. Large current accelerators of the cockcroft-walton type require a complicated manual operation which entails applying to the electrodes a low voltage which is gradually increased to induce a vacuum discharge and then terminated. When the discharge attains an extremely low level, the voltage is again impressed and again raised to a high value in low current type accelerators, a high voltage power supply charges the electrodes once to induce discharge followed by reapplying the voltage when the vacuum discharge reaches a low level, according to which high voltage is automatically applied. This procedure, however, requires that the high voltage power supply be provided with a large internal resistance to limit the current to within several milliamps. The present invention connects a high voltage power supply and an accelerator tube through a discharge current limiting resistor wired in parallel with a switch. Initially, the switch is opened enabling the power supply to impress a voltage limited to a prescribed value by a suitably chosen resistor. Conditioning is effected by allowing the voltage between electrodes to increase and is followed by closing the switch through which high voltage is applied directly to the accelerator for operation. (K.J. Owens)

  8. Architecture of petawatt-class z-pinch accelerators

    Directory of Open Access Journals (Sweden)

    W. A. Stygar

    2007-03-01

    Full Text Available We have developed an accelerator architecture that can serve as the basis of the design of petawatt-class z-pinch drivers. The architecture has been applied to the design of two z-pinch accelerators, each of which can be contained within a 104-m-diameter cylindrical tank. One accelerator is driven by slow (∼1   μs Marx generators, which are a mature technology but which necessitate significant pulse compression to achieve the short pulses (≪1   μs required to drive z pinches. The other is powered by linear transformer drivers (LTDs, which are less mature but produce much shorter pulses than conventional Marxes. Consequently, an LTD-driven accelerator promises to be (at a given pinch current and implosion time more efficient and reliable. The Marx-driven accelerator produces a peak electrical power of 500 TW and includes the following components: (i 300 Marx generators that comprise a total of 1.8×10^{4} capacitors, store 98 MJ, and erect to 5 MV; (ii 600 water-dielectric triplate intermediate-store transmission lines, which also serve as pulse-forming lines; (iii 600 5-MV laser-triggered gas switches; (iv three monolithic radial-transmission-line impedance transformers, with triplate geometries and exponential impedance profiles; (v a 6-level 5.5-m-diameter 15-MV vacuum insulator stack; (vi six magnetically insulated vacuum transmission lines (MITLs; and (vii a triple-post-hole vacuum convolute that adds the output currents of the six MITLs, and delivers the combined current to a z-pinch load. The accelerator delivers an effective peak current of 52 MA to a 10-mm-length z pinch that implodes in 95 ns, and 57 MA to a pinch that implodes in 120 ns. The LTD-driven accelerator includes monolithic radial transformers and a MITL system similar to those described above, but does not include intermediate-store transmission lines, multimegavolt gas switches, or a laser trigger system. Instead, this accelerator is driven by 210

  9. Design for ANL 7 GeV storage ring vacuum system

    International Nuclear Information System (INIS)

    Wehrle, R.B.; Nielsen, R.W.

    1988-01-01

    The 7-GeV Advanced Photon Source (APS) design includes a storage ring having a 1060-m circumference with the capability of accommodating 34 insertion devices (ID) and their associated photon beam lines. An additional 35 photon lines can be provided from bending magnets. The vacuum system for the storage ring is designed to maintain a beam-on operating pressure of 1n Torr or less to achieve a positron beam lifetime of approximately 20 hours. The vacuum system and it's current developmental status are described

  10. Pulsed electron accelerator for radiation technologies in the enviromental applications

    Science.gov (United States)

    Korenev, Sergey

    1997-05-01

    The project of pulsed electron accelerator for radiation technologies in the environmental applications is considered. An accelerator consists of high voltage generator with vacuum insulation and vacuum diode with plasma cathode on the basis discharge on the surface of dielectric of large dimensions. The main parameters of electron accelerators are following: kinetic energy 0.2 - 2.0 MeV, electron beam current 1 - 30 kA and pulse duration 1- 5 microseconds. The main applications of accelerator for decomposition of wastewaters are considered.

  11. Development of the accelerating system

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Jiho; Kwon, H. J.; Kim, D. I.; Kim, H. S.; Ryu, J. Y.; Park, B. S.; Seol, K. T.; Yun, S. P.; Song, Y. G.; Cho, Y. S.

    2013-02-15

    One of the main purposes of the 'Development of the Accelerating System' is developing a 100-MeV proton linac which accelerate proton beams from 20 MeV to 100 MeV by using 7 DTL (drift tube linac) tanks. Two of them were finished in the 2-nd stage of the project. The remaining part was also successfully fabricated and installed at Gyeongju site of KAERI. The MEBT is an essential component to extract and supply 20-MeV proton beams to users, and to match proton beams to the next accelerating structure for 100-MeV acceleration. The development of the MEBT has successfully finished. The project also developed the digital LLRF (low level RF) system which control the accelerating field within 1% in magnitude and 1 degree in phase. This system has been successfully tested in the 20-MeV linac operation at Daejeon site of KAERI. The modified version of the digital LLRF system will be used in the 100-MeV linac operation. The project also developed the beam diagnostic system. They are the strip-line type beam position monitor (BPM), the beam current monitor (CT), the beam loss monitor (BLM), and the emittance measurement system. They are used to measure the characteristics of the 20-MeV proton beams. The project also developed the EPIC-based control system. It is used to monitor the status of the accelerator and components, and to remotely control accelerator components. It has been used and modified in the 20-MeV linac operation. The modified version of the LLRF, diagnostics and control systems will be used in 100-MeV linac operation.

  12. Design of dry scroll vacuum pumping system for efficient pumping of corrosive gas at medium vacuum range

    International Nuclear Information System (INIS)

    Banerjee, I.; Chandresh, B.G.; Guha, K.C.; Sarkar, S.

    2015-01-01

    Dry vacuum pumping systems attracts many applications because of its inherent capability of corrosion free pumping. It becomes a common trait of application in Thermo Nuclear Fusion, Semi conductor, Isotope separation industries etc. Thermo nuclear fusion requires a train of specially sealed roots pump backed by suitable capacity dry screw or reciprocating pump. Similarly corrosive fluoride gas pumping requires hermetically sealed specially designed dry scroll vacuum pump. Plant emergency operation however involves train of specially sealed roots pump backed with scroll pump for faster evacuation. In our attempt an indigenously designed scroll pump and associated system are designed to pump corrosive gases in a way to confine the corrosion product within the system. In order to execute the design, a numerical code for low pressure application is developed

  13. Conceptual Design of ILC Damping Ring Wiggler Straight Vacuum System

    International Nuclear Information System (INIS)

    Marks, S.; Kennedy, K.; Plate, D.; Schlueter, R.D.; Zisman, M.

    2007-01-01

    The positron and electron damping rings for the International Linear Collider will contain long straight sections consisting of twenty wiggler/quadrupole pairs. The wigglers will be based upon the CESR superconducting design. There are a number of challenges associated with the design of the wiggler straight vacuum system, in particular, the absorption of photon power generated by the wigglers. This paper will present the overall conceptual design of the wiggler straight vacuum system developed for the ILC Reference Design Report. Particular emphasis will be placed on photon power load calculations and the absorber design

  14. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B.

    Energy Technology Data Exchange (ETDEWEB)

    FOERSTER,C.

    1999-05-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of {approximately} 1 x 10{sup {minus}10} Torr without beam and {approximately} 1 x 10{sup {minus}9} Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware

  15. Design and performance of main vacuum pumping system of SST-1 Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Ziauddin, E-mail: ziauddin@ipr.res.in; Pathan, Firozkhan; George, Siju; Dhanani, Kalpesh; Paravastu, Yuvakiran; Semwal, Pratibha; Pradhan, Subrata

    2014-01-15

    Highlights: •SST-1 Tokamak was successfully commissioned. •Vacuum vessel and cryostat were pumped down to 6.3 × 10{sup −7} mbar and 1.3 × 10{sup −5} mbar. •Leaks developed during baking were detected in-situ by RGA and confirmed later on. •Cryo-pumping effect was observed when LN2 thermal shields reached below 273 K. •Non-standard aluminum wire-seals have shown leak tightness < 1.0 × 10{sup −9} mbar l/s. -- Abstract: Steady-state Superconducting Tokamak (SST-1) was installed and it is commissioning for overall vacuum integrity, magnet systems functionality in terms of successful cool down to 4.5 K and charging up to 10 kA current was started from August 2012. Plasma operation of 100 kA current for more than 100 ms was also envisaged. It is comprised of vacuum vessel (VV) and cryostat (CST). Vacuum vessel, an ultra-high (UHV) vacuum chamber with net volume of 23 m{sup 3} was maintained at the base pressure of 6.3 × 10{sup −7} mbar for plasma confinement. Cryostat, a high-vacuum (HV) chamber with empty volume 39 m{sup 3} housing superconducting magnet system, bubble thermal shields and hydraulics for these circuits, maintained at 1.3 × 10{sup −5} mbar in order to provide suitable environment for these components. In order to achieve these ultimate vacuums, two numbers of turbo-molecular pumps (TMP) are installed in vacuum vessel while three numbers of turbo-molecular pumps are installed in cryostat. Initial pumping of both the chambers was carried out by using suitable Roots pumps. PXI based real time controlled system is used for remote operation of the complete pumping operation. In order to achieve UHV inside the vacuum vessel, it was baked at 150 °C for longer duration. Aluminum wire-seals were used for all non-circular demountable ports and a leak tightness < 1.0 × 10{sup −9} mbar l/s were achieved.

  16. The vacuum system for the PEP II high energy ring straight sections

    International Nuclear Information System (INIS)

    Wienands, U.; Daly, E.; Heifets, S.A.; Kulikov, A.; Kurita, N.; Nordby, M.; Perkins, C.; Reuter, E.; Seeman, J.T.; Belser, F.C.; Berg, J.; Holdener, F.R.; Kerns, J.A.; McDaniel, M.R.; Stoeffl, W.

    1995-01-01

    The six straight sections of the PEP II High Energy Ring (HER) serve various functions: lattice tuning, beam injection and abort, providing space for rf cavities, longitudinal and transverse feedback, beam diagnostics and the interaction point. A stainless steel vacuum system has been designed; prototypes are currently being built. Cooling is required due to radiation coming from the last arc dipole and resistive losses in the vacuum chamber. Although the nominal beam current of the HER is 1 A the vacuum system is designed for 3 A to provide margin and an upgrade path. 5 refs., 7 figs

  17. Synchrotron radiation sources: general features and vacuum system

    International Nuclear Information System (INIS)

    Craievich, A.F.

    1985-01-01

    In the last years the electron or positron storage rings, which were until 1970 only used for high energy physics experiments, begun to be built in several countries exclusively as electromagnetic radiation source (synchrotron radiation). The sources are generally made up by injector (linear accelerator or microtron), 'booster' (synchrotron), storage ring, insertions ('Wigglers' and ondulators) and light lines. The interest by these sources are due to the high intensity, large spectrum (from infrared to the X-rays), polarization and pulsed structure of the produced radiation. For the ultra-vacuum obtainement, necessary for the functioning storage rings (p=10 -9 Torr), several special procedures are used. In Brazil the Synchrotron Radiation National Laboratory of the CNPq worked out a conceptual project of synchrotron radiation source, whose execution should begin by the construction of the several components prototypes. (L.C.) [pt

  18. Optimization of 200 kV electrostatic accelerator

    Directory of Open Access Journals (Sweden)

    M Nazmabadi

    2015-09-01

    Full Text Available Optimizations on 200 kV electrostatic accelerator have been done in order to increasing ion current on target, improving vacuum condition and reduction in x-rays emission, increasing stability of high voltage power supply and reaching much greater achievable voltage value. The accelerator tube has most important effect on beam tracing in the electrostatic accelerators. So precautions most be considered in designing and constructing of this part. In order to finding permissible tolerances in construction and assembling of 200 kV electrostatic accelerator column, first the effects of angle deviation of a part from accelerator axis on beam track in the accelerator tube was simulated with Simion 7.0 computer program. We found that in order to prevent beam lost, the tolerances of balancing and co-centering of each part should be smaller than 0.1 mm. Each part of accelerator tube constructed by tolerances lower than 0.05 mm. Ultrasonic cleaning method used in pre-assembling process of parts. Because of its excellences, in the new tube we used borosilicate glass instead of high density alumina as insulators between the metallic electrodes. After three days of working vacuum pumps the system reached to 8.0×10-7 and after months to 5.0×10-7 ultimate pressure values. Measurements showed that by these considerations the maximum of reachable ion current on target was 1.1 mA which increased 50% compared to old machine, while x-ray emission intensity was increased by 25%. Optimizations of high voltage power supply are now under studies and tests

  19. Fast space travel by vacuum zero-point field perturbations

    International Nuclear Information System (INIS)

    Froning, H. D. Jr.

    1999-01-01

    Forces acting upon an accelerating vehicle that is 'warping' its surrounding space are estimated, using the techniques of computational gas/fluid dynamics. Disturbances corresponding to perturbation of spacetime metric and vacuum zero-point fields by electromagnetic discharges are modeled as changes in the electric permittivity and magnetic permeability characteristics of the vacuum of space. And it is assumed that resistance to acceleration (vehicle inertia) is, in part, a consequence of zero-point radiation pressure field anisotropy in the warped space region surrounding the craft. The paper shows that resistance to vehicle acceleration can be diminished by spacetime warping that increases light propagation speed within the warped region. If sufficient warping is achieved, ship speed is slower than light speed within the region that surrounds it-even if it is moving faster-than-light with respect to earth

  20. Vacuum Analysis of Scanning Horn of Electron Beam Machine

    International Nuclear Information System (INIS)

    Suprapto; Sukidi; Sukaryono; Setyo Atmojo; Djasiman

    2003-01-01

    Vacuum analysis of scanning horn of electron beam machine (EBM) has been carried out. In EBM, electron beam produced by the electron gun is accelerated by the accelerating tube toward the target via scanning horn and window. To avoid the disturbance of electron beam trajectory in side the EBM, it is necessary to evacuate the EBM. In designing and constructing the scanning horn, vacuum analysis must be carried out to find the ultimate vacuum grade based on the analysis as well as on the test resulted by the vacuum pump. The ultimate vacuum grade is important and affecting the electron trajectory from electron gun to the target. The yield of the vacuum analysis show that the load gas to be evacuated were the outgassing, permeation and leakages where each value were 5.96487x10 -6 Torr liter/sec, 6.32083x10 -7 Torr liter/sec, and 1.3116234x10 -4 Torr liter/sec respectively, so that the total gas load was 1.377587x10 -4 Torr liter/sec. The total conductivity according to test result was 15.769 liter/sec, while the effective pumping rate and maximum vacuum obtained by RD 150 pump were 14.269 Torr liter/sec and 9.65x10 -6 Torr respectively, The vacuum steady state indicated by the test result was 3.5x10 -5 Torr. The pressure of 3.5x10 -5 Torr showed by the test is close to the capability of vacuum pump that is 2x10 -5 Torr. The vacuum test indicated a good result and that there was no leakage along the welding joint. In the latter of installation it considered to be has a pressure of 5x10 -6 Torr, because the aluminum gasket will be used to seal the window flanges and will be evacuated by turbomolecular pump with pumping rate of 500 liter/sec and ultimate vacuum of -10 Torr. (author)

  1. Limiter/vacuum system for plasma impurity control and exhaust in tokamaks

    International Nuclear Information System (INIS)

    Abdou, M.; Brooks, J.; Mattas, R.

    1980-01-01

    A detailed design of a limiter/vacuum system for plasma impurity control and exhaust has been developed for the STARFIRE tokamak power plant. It is shown that the limiter/vacuum concept is a very attractive option for power reactors. It is relatively simple and inexpensive and deserves serious experimental verification

  2. Baking system for vacuum components in INDUS-2

    International Nuclear Information System (INIS)

    Bhange, Nilesh J.; Bhatnagar, Prateek; Shukla, S.K.

    2005-01-01

    Optimized bake-out procedures are very important for the overall reliability of vacuum system. In this process the UHV components like Sputter ion pump (SIP), Titanium sublimation pump (TSP) are subjected to temperature rise for sufficiently long period of time. Baking is necessary for obtaining low out gassing rates. In order to provide controlled baking of UHV (Ultra High Vacuum) components for INDUS-II an intelligent ON/OFF control system was needed. For that purpose distributed control system was suitable. For fulfillment of this need modular baking system was developed. This system contains Temperature controller unit (TCU), Pressure Monitoring Unit (PMU), and Temperature control and pressure Monitoring Interface Software (TCPMIS). Each TCU is an eight channel temperature controlling unit. PMU is eight channel pressure monitoring unit to which analog data from gauges like Penning, BA Gauge controllers is given. TCPMIS is a user interface software developed for, controlling up to 5 TCU's. In this way 40 channel temperature control, data logging of 40 channel temperature and logging of eight channel pressures was realized. The present paper describes details about computer controlled baking system. (author)

  3. Cold Vacuum Dryer (CVD) Facility Security System Design Description. System 54

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    2000-01-01

    This system design description (SDD) addresses the Cold Vacuum Drying (CVD) Facility security system. The system's primary purpose is to provide reasonable assurance that breaches of security boundaries are detected and assessment information is provided to protective force personnel. In addition, the system is utilized by Operations to support reduced personnel radiation goals and to provide reasonable assurance that only authorized personnel are allowed to enter designated security areas

  4. Vacuum system of the Tokamak Novillo

    International Nuclear Information System (INIS)

    Valencia Alvarado, R.; Lopez Callejas, R.; Melendez Lugo, L.; Chavez Alarcon, E.

    1990-01-01

    A toroidal vacuum chamber of 28 access ports was constructed from four stainless steel 316L elbows joined together with dielectric seals to provide voltage break in the toroidal direction. All vacuum seals were viton O-rings. A 500 1/s turbomolecular pump provide a base pressure of 4 x 10 -8 mbar with light backing (∼ 60 deg C). In the regime of cleaning discharge the toroidal chamber is filled with H 2 to a pressure of 0.2 + 0.4 mbar. The ohmic heating coils are pulsed with a AF oscillator (10 kW, 17.5 kHz) for 60-80 msec, at a repetition rate of about 2 Hz. A toroidal magnetic field of roughly 600 G is added to generate the cleaning discharge. According to a residual gas analyzer installed in the system, 80% of the base pressure was given by water; the other components were hydrogen and mon- and dioxides of carbon. (Author)

  5. Beam vacuum system of Brookhaven's muon storage ring

    International Nuclear Information System (INIS)

    Hseuth, H.C.; Snydstrup, L.; Mapes, M.

    1995-01-01

    A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of the muons to an accuracy of 0.35 ppm.. The beam vacuum system of the storage ring will operate at 10 -7 Torr and has to be completely non-magnetic. It consists of twelve sector chambers. The chambers are constructed of aluminum and are approximately 3.5 m in length with a rectangular cross-section of 16.5 cm high by 45 cm at the widest point. The design features, fabrication techniques and cleaning methods for these chambers are described. The beam vacuum system will be pumped by forty eight non-magnetic distributed ion pumps with a total pumping speed of over 2000 ell/sec. Monte Carlo simulations of the pressure distribution in the muon storage region are presented

  6. Cold Vacuum Drying facility potable water system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) potable water (PW) system. The PW system provides potable water to the CVDF for supply to sinks, water closets, urinals, showers, custodial service sinks, drinking fountains, the decontamination shower, supply water to the non-PW systems, and makeup water for the de-ionized water system

  7. The Spallation Neutron Source accelerator system design

    Science.gov (United States)

    Henderson, S.; Abraham, W.; Aleksandrov, A.; Allen, C.; Alonso, J.; Anderson, D.; Arenius, D.; Arthur, T.; Assadi, S.; Ayers, J.; Bach, P.; Badea, V.; Battle, R.; Beebe-Wang, J.; Bergmann, B.; Bernardin, J.; Bhatia, T.; Billen, J.; Birke, T.; Bjorklund, E.; Blaskiewicz, M.; Blind, B.; Blokland, W.; Bookwalter, V.; Borovina, D.; Bowling, S.; Bradley, J.; Brantley, C.; Brennan, J.; Brodowski, J.; Brown, S.; Brown, R.; Bruce, D.; Bultman, N.; Cameron, P.; Campisi, I.; Casagrande, F.; Catalan-Lasheras, N.; Champion, M.; Champion, M.; Chen, Z.; Cheng, D.; Cho, Y.; Christensen, K.; Chu, C.; Cleaves, J.; Connolly, R.; Cote, T.; Cousineau, S.; Crandall, K.; Creel, J.; Crofford, M.; Cull, P.; Cutler, R.; Dabney, R.; Dalesio, L.; Daly, E.; Damm, R.; Danilov, V.; Davino, D.; Davis, K.; Dawson, C.; Day, L.; Deibele, C.; Delayen, J.; DeLong, J.; Demello, A.; DeVan, W.; Digennaro, R.; Dixon, K.; Dodson, G.; Doleans, M.; Doolittle, L.; Doss, J.; Drury, M.; Elliot, T.; Ellis, S.; Error, J.; Fazekas, J.; Fedotov, A.; Feng, P.; Fischer, J.; Fox, W.; Fuja, R.; Funk, W.; Galambos, J.; Ganni, V.; Garnett, R.; Geng, X.; Gentzlinger, R.; Giannella, M.; Gibson, P.; Gillis, R.; Gioia, J.; Gordon, J.; Gough, R.; Greer, J.; Gregory, W.; Gribble, R.; Grice, W.; Gurd, D.; Gurd, P.; Guthrie, A.; Hahn, H.; Hardek, T.; Hardekopf, R.; Harrison, J.; Hatfield, D.; He, P.; Hechler, M.; Heistermann, F.; Helus, S.; Hiatt, T.; Hicks, S.; Hill, J.; Hill, J.; Hoff, L.; Hoff, M.; Hogan, J.; Holding, M.; Holik, P.; Holmes, J.; Holtkamp, N.; Hovater, C.; Howell, M.; Hseuh, H.; Huhn, A.; Hunter, T.; Ilg, T.; Jackson, J.; Jain, A.; Jason, A.; Jeon, D.; Johnson, G.; Jones, A.; Joseph, S.; Justice, A.; Kang, Y.; Kasemir, K.; Keller, R.; Kersevan, R.; Kerstiens, D.; Kesselman, M.; Kim, S.; Kneisel, P.; Kravchuk, L.; Kuneli, T.; Kurennoy, S.; Kustom, R.; Kwon, S.; Ladd, P.; Lambiase, R.; Lee, Y. Y.; Leitner, M.; Leung, K.-N.; Lewis, S.; Liaw, C.; Lionberger, C.; Lo, C. C.; Long, C.; Ludewig, H.; Ludvig, J.; Luft, P.; Lynch, M.; Ma, H.; MacGill, R.; Macha, K.; Madre, B.; Mahler, G.; Mahoney, K.; Maines, J.; Mammosser, J.; Mann, T.; Marneris, I.; Marroquin, P.; Martineau, R.; Matsumoto, K.; McCarthy, M.; McChesney, C.; McGahern, W.; McGehee, P.; Meng, W.; Merz, B.; Meyer, R.; Meyer, R.; Miller, B.; Mitchell, R.; Mize, J.; Monroy, M.; Munro, J.; Murdoch, G.; Musson, J.; Nath, S.; Nelson, R.; Nelson, R.; O`Hara, J.; Olsen, D.; Oren, W.; Oshatz, D.; Owens, T.; Pai, C.; Papaphilippou, I.; Patterson, N.; Patterson, J.; Pearson, C.; Pelaia, T.; Pieck, M.; Piller, C.; Plawski, T.; Plum, M.; Pogge, J.; Power, J.; Powers, T.; Preble, J.; Prokop, M.; Pruyn, J.; Purcell, D.; Rank, J.; Raparia, D.; Ratti, A.; Reass, W.; Reece, K.; Rees, D.; Regan, A.; Regis, M.; Reijonen, J.; Rej, D.; Richards, D.; Richied, D.; Rode, C.; Rodriguez, W.; Rodriguez, M.; Rohlev, A.; Rose, C.; Roseberry, T.; Rowton, L.; Roybal, W.; Rust, K.; Salazer, G.; Sandberg, J.; Saunders, J.; Schenkel, T.; Schneider, W.; Schrage, D.; Schubert, J.; Severino, F.; Shafer, R.; Shea, T.; Shishlo, A.; Shoaee, H.; Sibley, C.; Sims, J.; Smee, S.; Smith, J.; Smith, K.; Spitz, R.; Staples, J.; Stein, P.; Stettler, M.; Stirbet, M.; Stockli, M.; Stone, W.; Stout, D.; Stovall, J.; Strelo, W.; Strong, H.; Sundelin, R.; Syversrud, D.; Szajbler, M.; Takeda, H.; Tallerico, P.; Tang, J.; Tanke, E.; Tepikian, S.; Thomae, R.; Thompson, D.; Thomson, D.; Thuot, M.; Treml, C.; Tsoupas, N.; Tuozzolo, J.; Tuzel, W.; Vassioutchenko, A.; Virostek, S.; Wallig, J.; Wanderer, P.; Wang, Y.; Wang, J. G.; Wangler, T.; Warren, D.; Wei, J.; Weiss, D.; Welton, R.; Weng, J.; Weng, W.-T.; Wezensky, M.; White, M.; Whitlatch, T.; Williams, D.; Williams, E.; Wilson, K.; Wiseman, M.; Wood, R.; Wright, P.; Wu, A.; Ybarrolaza, N.; Young, K.; Young, L.; Yourd, R.; Zachoszcz, A.; Zaltsman, A.; Zhang, S.; Zhang, W.; Zhang, Y.; Zhukov, A.

    2014-11-01

    The Spallation Neutron Source (SNS) was designed and constructed by a collaboration of six U.S. Department of Energy national laboratories. The SNS accelerator system consists of a 1 GeV linear accelerator and an accumulator ring providing 1.4 MW of proton beam power in microsecond-long beam pulses to a liquid mercury target for neutron production. The accelerator complex consists of a front-end negative hydrogen-ion injector system, an 87 MeV drift tube linear accelerator, a 186 MeV side-coupled linear accelerator, a 1 GeV superconducting linear accelerator, a 248-m circumference accumulator ring and associated beam transport lines. The accelerator complex is supported by ~100 high-power RF power systems, a 2 K cryogenic plant, ~400 DC and pulsed power supply systems, ~400 beam diagnostic devices and a distributed control system handling ~100,000 I/O signals. The beam dynamics design of the SNS accelerator is presented, as is the engineering design of the major accelerator subsystems.

  8. Factors determining the choice of the beam tube material and the vacuum chamber design for a superconducting high energy storage accelerator

    International Nuclear Information System (INIS)

    Aggus, J.; Edwards, D. Jr.; Halama, H.J.; Herrera, J.

    1979-01-01

    The factors which determine the choice of the material and the basic design for the vacuum chamber of the ISABELLE Colliding Storage Accelerator are reviewed. When the physical, thermal, electrical, and mechanical properties of the bulk material, as well as the various surface characteristics, are considered, it appears that a stainless tube covered with a copper sleeve is the best choice for the chambers in the magnet lattice of the rings. Aluminum is probably the most desirable material for those chambers in the experimental straight sections

  9. Baking controller for synchrotron beamline vacuum systems

    International Nuclear Information System (INIS)

    Garg, C.K.; Kane, S.R.; Dhamgaye, V.P.

    2003-01-01

    The 2.5 GeV electron storage ring Indus-2 is a hard X-ray Synchrotron Radiation (SR) Source. Nearly 27 beamlines will be installed on Indus-2 and they will cater to different experiments and applications. Most of the beamlines will be in Ultra High Vacuum (UHV) the only exception being hard X-rays beamlines. However the front ends of all the beamlines will be in UHV. Practicing UHV requires efforts and patience. Evacuating any chamber, volume gases can be removed easily. However, outgassing phenomena like desorption, diffusion and permeation restricts the system to attain UHV. All processes except the volume gas removal are temperature dependent. At ambient temperature, gas pressure decreases so slowly that outgassing limit (i.e. 10 -10 1/s/cm 2 ) can hardly be achieved on a practical time scale. Also there are three orders of magnitude difference in outgassing between baked and unbaked systems. Depending on the vacuum chamber and the components inside it, the thermal outgassing (baking) of system is required and can be done at various temperatures between 150 degC to 450 deg C. For whole baking cycle, constant monitoring and controlling of the systems is required which takes tens of hours. This paper describes the automation for such baking system, which will be used for SR beamlines

  10. PREFACE: International Symposium on `Vacuum Science and Technology' (IVS 2007)

    Science.gov (United States)

    Mittal, K. C.; Gupta, S. K.

    2008-03-01

    The Indian Vacuum Society (established in 1970) has organized a symposium every alternate year on various aspects of vacuum science and technology. There has been considerable participation from R & D establishments, universities and Indian industry in this event. In view of the current global scenario and emerging trends in vacuum technology, this year, the executive committee of IVS felt it appropriate to organize an international symposium at Tata Institute of Fundamental Research, Colaba, Mumbai 400 005 from 29-30 November 2007. This symposium provided a forum for exchange of information among vacuum scientists, technologists and industrialists on recent advances made in the areas of large vacuum systems, vacuum production, its measurement and applications in industry, and material processing in vacuum. Vacuum science and technology has made vital contributions in high tech areas like space, high energy particle accelerators, large plasma systems, electronics, thin films, melting and refining of metals, extraction and processing of advanced materials etc. The main areas covered in the symposium were the production and measurement of vacuums, leak detection, large vacuum systems, vacuum metallurgy, vacuum materials and processing inclusive of applications of vacuum in industry. Large vacuum systems for high energy particle accelerators, plasma devices and light sources are of special significance for this symposium. Vacuum evaporation, hard coatings, thin films, joining techniques, sintering, melting and heat treatment, furnaces and thermo dynamics are also covered in this symposium. There were eighteen invited talks from the best experts in the respective fields and more than one hundred contributed papers. This fact itself indicates the interest that has been generated amongst the scientists, technologists and industrialists in this field. In view of the industrial significance of the vacuum technology, an exhibition of vacuum and vacuum processing related

  11. CAS CERN accelerator school: 5. general accelerator physics course. Vol. 2. Proceedings

    International Nuclear Information System (INIS)

    Turner, S.

    1994-01-01

    The fifth CERN Accelerator School (CAS) basic course on General Accelerator Physics was given at the University of Jyvaeskylae, Finland, from 7 to 18 September 1992. Its syllabus was based on the previous similar courses held at Gif-sur-Yvette in 1984, Aarhus 1986, Salamanca 1988 and Juelich 1990, and whose proceedings were published as CERN Reports 85-19, 87-10, 89-05 and 91-04, respectively. However, certain topics were treated in a different way, improved or extended, while new subjects were introduced. As far as the proceedings of this school are concerned the opportunity was taken not only to include the lectures presented but also to select and revise the most appropriate chapters from the previous similar schools. In this way the present volumes constitute a rather complete introduction to all aspects of the design and construction of particle accelerators, including optics, emittance, luminosity, longitudinal and transverse beam dynamics, insertions, chromaticity, transfer lines, resonances, accelerating structures, tune shifts, coasting beams, lifetime, synchrotron radiation, radiation damping, beam-beam effects, diagnostics, cooling, ion and positron sources, RF and vacuum systems, injection and extraction, conventional, permanent and superconducting magnets, cyclotrons, RF linear accelerators, microtrons, as well as applications of particle accelerators (including therapy) and the history of accelerators. See hints under the relevant topics. (orig.)

  12. Proceedings of the Japan-U.S. workshop P-118 on vacuum technologies for fusion devices

    International Nuclear Information System (INIS)

    Miyahara, A.

    1989-01-01

    Fusion community does not appreciate vacuum technologies to the same extent as accelerator community does. This is because, in the case of accelerators, in particular storage ring systems, the requirement of attaining ultrahigh vacuum in order to avoid collisional loss is well defined, on the other hand, it is not possible to define the requirement so precisely in the case of fusion devices. One of the reasons is that core plasma interacts with vessel wall so strongly and unpredictably that it becomes difficult to identify the role played by individual components. However, in the next step and the next generation machines like CIT, LHS, ITER, FER and NET, vacuum technologies would play more significant roles, because the CIT will introduce tritium in a vacuum vessel, and the aim of the ITER project is to demonstrate particle balance, namely, to achieve steady state operation with D-T fuel. The Japan-U.S. workshop P-118 was held at the Institute of Plasma Physics, Nagoya University, from August 1 to 5, 1988. 33 participants including 4 from the U.S. took part in the workshop. In the plenary session, 12 lectures were given, and also the topics-oriented session on pumping, gauging, remote maintenance, first wall, pump limiter, divertor and others was held. (K.I.)

  13. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    International Nuclear Information System (INIS)

    Chan, C.K.; Chang, C.C.; Shueh, C.; Yang, I.C.; Wu, L.H.; Chen, B.Y.; Cheng, C.M.; Huang, Y.T.; Chuang, J.Y.; Cheng, Y.T.; Hsiao, Y.M.; Sheng, Albert

    2017-01-01

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  14. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    Energy Technology Data Exchange (ETDEWEB)

    Chan, C.K., E-mail: ckchan@nsrrc.org.tw; Chang, C.C.; Shueh, C.; Yang, I.C.; Wu, L.H.; Chen, B.Y.; Cheng, C.M.; Huang, Y.T.; Chuang, J.Y.; Cheng, Y.T.; Hsiao, Y.M.; Sheng, Albert

    2017-04-11

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  15. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    Science.gov (United States)

    Chan, C. K.; Chang, C. C.; Shueh, C.; Yang, I. C.; Wu, L. H.; Chen, B. Y.; Cheng, C. M.; Huang, Y. T.; Chuang, J. Y.; Cheng, Y. T.; Hsiao, Y. M.; Sheng, Albert

    2017-04-01

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  16. Cold Vacuum Drying Facility Condensate Collection System Design Description. System 19

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    2000-01-01

    The Cold Vacuum Drying (CVD) Facility of Spent Nuclear Fuel (SNF) provides required process systems, supporting equipment, and facilities to support the SNF Project mission. This system design description (SDD) addresses the Condensate Collection System (CCS). This is a general service system. The CCS begins at the condensate outlet of the general process air-handling unit (AHU) and the condensate outlets for the active process bays AHUs. The system terminates at each condensate collection tank (5 total)

  17. JKJ accelerator timing system

    International Nuclear Information System (INIS)

    Ohmori, C.; Mori, Y.; Yoshii, M.; Yamamoto, M.

    2001-01-01

    The JKJ (JAERl-KEK Joint Project) accelerator complex consists of the linear accelerator, 3 GeV and 50 GeV synchrotrons. To minimize the beam loss during the beam transfer from the 3 GeV synchrotron to the 50 GeV one, the synchronization of the two RF system of the rings is very important. To reduce the background from the high and low momentum neutron, the neutron beam chopper will be employed. The 3 GeV RF will be also synchronized to the chopper timing when the beam goes to the neutron facility. The whole timing control system of these accelerators and chopper will be described. (author)

  18. Three-dimensional electromagnetic model of the pulsed-power Z-pinch accelerator

    Directory of Open Access Journals (Sweden)

    D. V. Rose

    2010-01-01

    Full Text Available A three-dimensional, fully electromagnetic model of the principal pulsed-power components of the 26-MA ZR accelerator [D. H. McDaniel et al., in Proceedings of the 5th International Conference on Dense Z-Pinches (AIP, New York, 2002, p. 23] has been developed. This large-scale simulation model tracks the evolution of electromagnetic waves through the accelerator’s intermediate-storage capacitors, laser-triggered gas switches, pulse-forming lines, water switches, triplate transmission lines, and water convolute to the vacuum insulator stack. The insulator-stack electrodes are coupled to a transmission-line circuit model of the four-level magnetically insulated vacuum-transmission-line section and double-post-hole convolute. The vacuum-section circuit model is terminated by a one-dimensional self-consistent dynamic model of an imploding z-pinch load. The simulation results are compared with electrical measurements made throughout the ZR accelerator, and are in good agreement with the data, especially for times until peak load power. This modeling effort demonstrates that 3D electromagnetic models of large-scale, multiple-module, pulsed-power accelerators are now computationally tractable. This, in turn, presents new opportunities for simulating the operation of existing pulsed-power systems used in a variety of high-energy-density-physics and radiographic applications, as well as even higher-power next-generation accelerators before they are constructed.

  19. Proceedings of the 5th symposium on accelerator science and technology

    International Nuclear Information System (INIS)

    1985-01-01

    This proceedings are included 157 papers to submitting 5th Symposium on Accelerator Science and Technology. The papers are presented under the following main topics: a) invited talk (3 papers), b) status of accelerator construction and operation (12 papers), c) ion source and DC accelerator(7 papers), d) linac (16 papers), e) RF acceleration system (15 papers), f) beam monitor and beam handling (20 papers), g) magnet and power supply (13 papers), h) vacuum (12 papers), i) beam dynamics (20 papers), j) accelerator operation and control (22 papers), k) radiation and safety (8 papers), 1) future project (8 papers) and so on. (J.P.N.)

  20. Heavy ion acceleration at the AGS

    International Nuclear Information System (INIS)

    Lee, Y.Y.

    1989-01-01

    The Brookhaven AGS is alternating gradient synchrotron, 807 meters in circumference, which was originally designed for only protons. Using the 15 MV Brookhaven Tandem Van de Graaff as an injector, the AGS started to accelerate heavy ions of mass lighter than sulfur. Because of the relatively poor vacuum (∼10 -8 Torr), the AGS is not able to accelerate heavier ions which could not be fully stripped of electrons at the Tandem energy. When the AGS Booster, which is under construction, is completed the operation will be extended to all species of heavy ions including gold and uranium. Because ultra-high vacuum (∼10 -11 Torr) is planned, the Booster can accelerate partially stripped elements. The operational experience, the parameters, and scheme of heavy ion acceleration will be presented in detail from injection to extraction, as well as future injection into the new Relativistic Heavy Ion Collider (RHIC). A future plan to improve intensity of the accelerator will also be presented. 5 figs., 4 tabs

  1. Development of the cybernetic methods in the new generation of superhigh-energy accelerators

    International Nuclear Information System (INIS)

    Vasil'ev, A.A.; Berezhnoj, V.A.

    1985-01-01

    The problems related to the use of cybernetic methods in case of the development of control systems for superhigh-energy accelerators, particularly for parameters control which determine betatron particle oscillations are discussed. It is pointed out that early in 1960-s the development of the 1 TeV cybernetic accelerating complex consisting of a linear accelerator - injector, booster and main accelerator has been started. The conclusion is drawn that with the increase of accelerator energy, increase of ring magnet perimeter and decrease of vacuum chaber aperture as well as owing to comlication of accelerating complexes complication of operational modes and increase of particle beams intensity the use of cybernetic methods and completely automated control systems created on their base becomes in future still more pressing

  2. Cold Vacuum Drying (CVD) Electrical System Design Description

    International Nuclear Information System (INIS)

    SINGH, G.

    2000-01-01

    This system design description (SDD) provides a technical explanation of the design and operation of the electrical system for the Cold Vacuum Drying Facility (CVDF). This SDD also identifies the requirements, and the basis for the requirements and details on how the requirements have been implemented in the design and construction of the facility. This SDD also provides general guidance for the surveillance, testing, and maintenance of this system

  3. Cold Vacuum Drying Safety Class Instrumentation and Control System Design Description

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) Safety Class Instrumentation and Control system (SCIC). The SCIC provides safety functions and features to protect the environment, off-site and on-site personnel and equipment. The function of the SCIC is to provide automatic trip features, valve interlocks, alarms, indication and control for the cold vacuum drying process

  4. A vacuum--generated inertia reaction force

    International Nuclear Information System (INIS)

    Rueda, Alfonso; Haisch, Bernard

    2001-01-01

    A clear and succinct covariant approach shows that, in principle, there must be a contribution to the inertia reaction force on an accelerated object by the surrounding vacuum electromagnetic field in which the object is embedded. No details of the vacuum to object electromagnetic interaction need to be specified other than the fact that the object is made of electromagnetically interacting particles. Some interesting consequences of this feature are discussed. This analysis strongly supports the concept that inertia is indeed an opposition of the vacuum fields to any attempt to change the uniform state of motion of material bodies. This also definitely shows that inertia should be viewed as extrinsic to mass and that causing agents and/or mechanisms responsible for the inertia reaction force are neither intrinsic to the notion of mass nor to the entities responsible for the existence of mass in elementary particles (as, e.g., the Higgs field). In other words the mechanism that produces the inertia-reaction-force requires an explicit explanation. This explicit explanation is that inertia is an opposition of the vacuum fields to the accelerated motion of any material entities, i.e., of entities that possess mass. It is briefly commented why the existence of a Higgs field responsible for the generation of mass in elementary particles does not contradict the view presented here. It is also briefly discussed why a strict version of Mach's Principle does really contradict this view, though a broad sense version of Mach's Principle may be in agreement

  5. Summary of ACSL Simulations of the MSRE Auxiliary Charcoal Bed Vacuum System

    Energy Technology Data Exchange (ETDEWEB)

    Damiano, B

    2000-10-26

    The simulation of the Auxiliary Charcoal Bed (ACB) Vacuum System was performed to evaluate the original vacuum system design, detect and identify design deficiencies, investigate the effects of proposed corrections on system performance, and generally aid in refining the system design before construction and mockup testing. The simulation was performed by using the Advanced Continuous Simulation Language (ACSL). The vacuum system design goals are to provide approximately 20 SCFM of both booster gas and purge gas through the system and maintain a flow of approximately 40 SCFM with a velocity of 50 to 75 f/sec at the entrance to the cyclone separator. The model results showed that the original system design was incapable of meeting the system performance goals. Further simulations showed that the following modifications to the original vacuum system design were required to make the system performance acceptable; (1) Remove valve PCV4. (2) Modify the flow controllers FTC3 and FTC4 from the original flow range of 0-17.6 SCFM (0-500 SLM) to 0-35.3 SCFM (0-1000 SLM). (3) Replace the bellows sealed valves SV-1, SV-3A, SV-3B, SV-4A, and SV-4B with less restrictive ball valves. The simulation results saved considerable time and effort by identifying flaws in the original system design. Early identification of these flaws and the use of the simulation model to investigate possible solutions allowed corrective modifications to be made before construction of the mock up test facility.

  6. ATLAS magnet common cryogenic, vacuum, electrical and control systems

    CERN Document Server

    Miele, P; Delruelle, N; Geich-Gimbel, C; Haug, F; Olesen, G; Pengo, R; Sbrissa, E; Tyrvainen, H; ten Kate, H H J

    2004-01-01

    The superconducting Magnet System for the ATLAS detector at the LHC at CERN comprises a Barrel Toroid, two End Cap Toroids and a Central Solenoid with overall dimensions of 20 m diameter by 26 m length and a stored energy of 1.6 GJ. Common proximity cryogenic and electrical systems for the toroids are implemented. The Cryogenic System provides the cooling power for the 3 toroid magnets considered as a single cold mass (600 tons) and for the CS. The 21 kA toroid and the 8 kA solenoid electrical circuits comprise both a switch-mode power supply, two circuit breakers, water cooled bus bars, He cooled current leads and the diode resistor ramp-down unit. The Vacuum System consists of a group of primary rotary pumps and sets of high vacuum diffusion pumps connected to each individual cryostat. The Magnet Safety System guarantees the magnet protection and human safety through slow and fast dump treatment. The Magnet Control System ensures control, regulation and monitoring of the operation of the magnets. The update...

  7. Research of Virtual Accelerator Control System

    Institute of Scientific and Technical Information of China (English)

    DongJinmei; YuanYoujin; ZhengJianhua

    2003-01-01

    A Virtual Accelerator is a computer process which simulates behavior of beam in an accelerator and responds to the accelerator control program under development in a same way as an actual accelerator. To realize Virtual Accelerator, control system should provide the same program interface to top layer Application Control Program, it can make 'Real Accelerator' and 'Virtual Accelerator'use the same GUI, so control system should have a layer to hide hardware details, Application Control Program access control devices through logical name but not through coded hardware address. Without this layer, it is difficult to develop application program which can access both 'Virtual' and 'Real' Accelerators using same program interfaces. For this reason, we can create CSR Runtime Database which allows application program to access hardware devices and data on a simulation process in a unified way. A device 'is represented as a collection of records in CSR Runtime Database. A control program on host computer can access devices in the system only through names of record fields, called channel.

  8. Vacuum control system of VEC

    International Nuclear Information System (INIS)

    Roy, Anindya; Bhole, R.B.; Bandopadhyay, D.L.; Mukhopadhyay, B.; Pal, Sarbajit; Sarkar, D.

    2009-01-01

    As a part of modernization of VEC (Variable Energy Cyclotron), the Vacuum Control System is being upgraded to PLC based automated system from initial Relay based Manual system. EPICS (Experimental Physics and Industrial Control System), a standard open source software tool for designing distributed control system, is chosen for developing the supervisory control software layer, leading towards a unified distributed control architecture of VEC Control System. A Modbus - TCP based IOC (I/O Controller) has been developed to communicate control data to PLC using Ethernet-TCP LAN. Keeping in mind, the operators' familiarity with MS-Windows, a MS-Windows based operator interface is developed using VB6. It is also used to test and evaluate EPICS compatibility to MS Windows. Several MS Windows ActiveX components e.g. text display, image display, alarm window, set-point input etc. have been developed incorporating Channel Access library of EPICS. Use of such components ease the programming complexity and reduce developmental time of the operator interface. The system is in the final phase of commissioning. (author)

  9. Recent results on cleaning and conditioning the ATF vacuum system

    International Nuclear Information System (INIS)

    Langley, R.A.; Clark, T.L.; Glowienka, J.C.; Goulding, R.H.; Mioduszewski, P.K.; Rasmussen, D.A.; Rayburn, T.F.; Schaich, C.R.; Shepard, T.D.; Simpkins, J.E.; Yarber, J.L.

    1990-01-01

    Techniques for cleaning and conditioning the vacuum vessel of the Advanced Toroidal Facility (ATF) and its internal components are described. The vacuum vessel cleaning technique combines baking to 150 degree C and glow discharges with hydrogen gas. Chromium gettering is used to further condition the system. The major internal components are the anodized aluminum baffles in the Thomson scattering system, a graphite-shielded ICRF antenna, two graphite limiters, and a diagnostic graphite plate. Three independent heating systems are used to bake some of the major components of the system. The major characteristics used for assessing cleanliness and conditioning progress are the maximum pressure attained during bakeout, the results of gas analysis, and revelant plasma parameters (e.g., time to radiative decay). Details of the various cleaning and conditioning procedures and results are presented

  10. Development of a control system for compression and expansion cycles of critical valve for high vacuum systems

    Energy Technology Data Exchange (ETDEWEB)

    Agarwal, Jyoti, E-mail: jagarwal@ipr.res.in; Sharma, H.; Patel, Haresh; Gangradey, R.; Lambade, Vrushabh

    2016-11-15

    Highlights: • Control system with feedback loop of pressure gauge is developed for measuring the life cycle of vacuum isolation valve. • GUI based software developed for easy use and handling of control system. • Control system tested with an experiment showcasing the capability of the control system. • Control system can operate valve based on pressure inside the chamber, which helps to know the degradation of sealing capabilities of valve. • Control system can monitor the total closing and opening time of valve, cycles and pressure inside the vessel. - Abstract: A control system with feedback loop is designed, developed and tested to monitor the life cycles of the axial valve and bellows used in vacuum valves. The control system monitors number of compression cycles of any bellow or closing and opening cycle of a valve. It also interfaces vacuum gauges or pressure gauges to get pressure values inside the system. To find life cycle of valve, the developed control and monitoring system is integrated with an axial valve experimental test set up. In this system, feedback from the vacuum gauge attached to valve enclosure, is given and the life cycle test is automated. This paper describes the control and monitoring system in details and briefs the experiment carried out for valve life cycle. The same system can be used for life cycle estimate for bellows. A suitable GUI is also developed to control the function of the components and resister the number of cycles.

  11. The relationship between vacuum and atomic collisions in solids

    International Nuclear Information System (INIS)

    Carter, G.; Armour, D.G.

    1980-01-01

    Atomic collision events in solids are frequently stimulated by external irradiation with energetic heavy ions. This requires production, acceleration and manipulation of ion beams in vacuum system with ensuing problems arising in perturbations to ion beam quality from gas phase collisions. In addition the dynamic interaction between the gas phase and any surfaces at which atomic collisions are under investigation can lead to perturbation to the collision events by adsorbed contaminant. This review discusses both gas phase requirements for ion accelerators to minimize deleterious effects and outlines some of the processes which occur in atomic collisions due to the presence of adsorbed impurities. Finally it is shown how certain atomic collision processes involving elastic scattering may be employed to investigate surface adsorption and related effects. (author)

  12. Bench measurement of vacuum chamber impedances with wires

    International Nuclear Information System (INIS)

    Shafer, R.E.

    1979-01-01

    Particle beams travelling in an accelerator or storage ring vacuum chamber produce electric and magnetic fields which interact with the walls of the chamber. The induced wall currents in turn generate secondary fields which can interact with the beam, giving rise to both energy loss and other effects which can cause beam instability. In many simple geometries these effects can be calculated. In more complex geometries the calculations are difficult and very approximate. For this reason it is important that the effects be measured if possible prior to installation. As accelerators become larger and the number of vacuum chamber components more numerous, and as more severe beam intensity and stability requirements are placing lower limits on the longitudinal and transverse impedances, a less than adequate component will be more likely to limit machine performance

  13. Trial lectures for accelerator operators in SPring-8

    International Nuclear Information System (INIS)

    Ohshima, T.

    2004-01-01

    In case of the SPring-8, accelerator operators are working in three shifts of eight hours. They are making the scheduled beam injection to the storage ring, routine measurements of beam parameters such as the COD, the betatron tunes, the bunch current of stored beam and so on. They are keeping watch on operational state every time. In case of something wrong, they will take measures to meet the situation. Newcomer of operator works with an experienced one to learn sequence of the beam injection, how to operate Graphical User Interface and (GUI) so on. In addition, we organise preliminary lectures on accelerator for operators. Topics done in the lectures are RF system, vacuum system, magnet system, monitors, beam diagnostics, accelerator and beamline control system etc. The contents of the lecture can be seen through web browser again and again. It is useful for operators to understand the SPring-8 facility and details of their work because some of them are not familiar with the accelerator field before being an operator of SPring-8. (author)

  14. Vacuum leak detector and method

    Science.gov (United States)

    Edwards, Jr., David

    1983-01-01

    Apparatus and method for detecting leakage in a vacuum system involves a moisture trap chamber connected to the vacuum system and to a pressure gauge. Moisture in the trap chamber is captured by freezing or by a moisture adsorbent to reduce the residual water vapor pressure therein to a negligible amount. The pressure gauge is then read to determine whether the vacuum system is leaky. By directing a stream of carbon dioxide or helium at potentially leaky parts of the vacuum system, the apparatus can be used with supplemental means to locate leaks.

  15. Nuclear researches using unique installations and vacuum stands

    International Nuclear Information System (INIS)

    Oprea, C.; Oprea, A.; Curuia, M.; Mateescu, G.; Kappel, W.

    2007-01-01

    Full text: In this paper the development and application of nuclear methods using critical technologies for the analysis of nuclear and magnetic nanostructure of different systems are presented. The work consists of 3 parts: - 1.The modernization and use of the thermostat TS-3000K aimed for inelastic and quasi-elastic slow neutron scattering and neutron diffraction experiments in vacuum in condensed matter field, over a very large temperature range (up to 3000 K); - 2. The analysis of the nanostructure of Fe-Cu alloy performing measurements in vacuum by RBS and PIXE methods at the EG-5 Van der Graaf electrostatic accelerator of FLNP, JINR; - 3. Environmental researches conducted on different ecological objects by NAA and IGAA methods at the microtron MT-25. The present report presents the researches within the frame of the three international priority directions: - i. Industry of nanomaterials and nanosystems; - ii. Vacuum technology; - iii. Rational use of natural resources. The results proved that various traditional and new properties of materials which pose a structure at nano level have a good perspective to be further investigated by applying the nuclear methods. (authors)

  16. Can observations inside the Solar System reveal the gravitational properties of the quantum vacuum?

    CERN Document Server

    Hajdukovic, Dragan Slavkov

    2013-01-01

    The understanding of the gravitational properties of the quantum vacuum might be the next scientific revolution.It was recently proposed that the quantum vacuum contains the virtual gravitational dipoles; we argue that this hypothesis might be tested within the Solar System. The key point is that quantum vacuum ("enriched" with the gravitational dipoles) induces a retrograde precession of the perihelion. It is obvious that this phenomenon might eventually be revealed by more accurate studies of orbits of planets and orbits of the artificial Earth satellites. However, we suggest that potentialy the best "laboratory" for the study of the gravitational properties of the quantum vacuum is the Dwarf Planet Eris and its satellite Dysnomia; the distance of nearly 100AU makes it the unique system in which the precession of the perihelion of Dysnomia (around Eris) is strongly dominated by the quantum vacuum.

  17. Open loop, auto reversing liquid nitrogen circulation thermal system for thermo vacuum chamber

    International Nuclear Information System (INIS)

    Naidu, M C A; Nolakha, Dinesh; Saharkar, B S; Kavani, K M; Patel, D R

    2012-01-01

    In a thermo vacuum chamber, attaining and controlling low and high temperatures (-100 Deg. C to +120 Deg. C) is a very important task. This paper describes the development of 'Open loop, auto reversing liquid nitrogen based thermal system'. System specifications, features, open loop auto reversing system, liquid nitrogen flow paths etc. are discussed in this paper. This thermal system consists of solenoid operated cryogenic valves, double embossed thermal plate (shroud), heating elements, temperature sensors and PLC. Bulky items like blowers, heating chambers, liquid nitrogen injection chambers, huge pipe lines and valves were not used. This entire thermal system is very simple to operate and PLC based, fully auto system with auto tuned to given set temperatures. This system requires a very nominal amount of liquid nitrogen (approx. 80 liters / hour) while conducting thermo vacuum tests. This system was integrated to 1.2m dia thermo vacuum chamber, as a part of its augmentation, to conduct extreme temperature cycling tests on passive antenna reflectors of satellites.

  18. Cold Vacuum Drying (CVD) Electrical System Design Description

    International Nuclear Information System (INIS)

    BRISBIN, S.A.

    1999-01-01

    This document provides a technical explanation of the design and operation of the electrical system for the Cold Vacuum Drying Facility. This document identifies the requirements, and the basis for the requirements and details on how the requirements have been implemented in the design and construction of the facility. This document also provides general guidance for the surveillance, testing, and maintenance of this system

  19. Ion-stimulated gas desorption yields of coated (Au, Ag, Pd) stainless steel vacuum chambers irradiated with 4.2 MeV/u lead ions

    CERN Document Server

    Mahner, E; Küchler, D; Malabaila, M; Taborelli, M

    2005-01-01

    The ion-induced desorption experiment, installed in the CERN Heavy Ion Accelerator (LINAC 3), has been used to measure molecular desorption yields for 4.2 MeV/u lead ions impacting on different accelerator-type vacuum chambers. In order to study the effect of the surface oxide layer on the gas desorption, gold-, silver-, and palladium-coated 316LN stainless steel chambers and similarly prepared samples were tested for desorption at LINAC 3 and analysed for chemical composition by X-ray Photoemission Spectroscopy (XPS). The large effective desorption yield of 2 x 10**4 molecules/ion, previously measured for uncoated, vacuum fired stainless steel, was reduced after noble metal coating by up to 2 orders of magnitude. In addition, the effectiveness of beam scrubbing with heavy ions and the consequence of a subsequent venting on the desorption yields of a beam-scrubbed vacuum chamber are described. Practical consequences for the vacuum system of the future Low Energy Ion Ring (LEIR) are discussed.

  20. Accelerator System Development at High Voltage Engineering

    International Nuclear Information System (INIS)

    Klein, M. G.; Gottdang, A.; Haitsma, R. G.; Mous, D. J. W.

    2009-01-01

    Throughout the years, HVE has continuously extended the capabilities of its accelerator systems to meet the rising demands from a diverse field of applications, among which are deep level ion implantation, micro-machining, neutron production for biomedical research, isotope production or accelerator mass spectrometry. Characteristic for HVE accelerators is the coaxial construction of the all solid state power supply around the acceleration tubes. With the use of solid state technology, the accelerators feature high stability and very low ripple. Terminal voltages range from 1 to 6 MV for HVE Singletrons and Tandetrons. The high-current versions of these accelerators can provide ion beams with powers of several kW. In the last years, several systems have been built with terminal voltages of 1.25 MV, 2 MV and 5 MV. Recently, the first system based on a 6 MV Tandetron has passed the factory tests. In this paper we describe the characteristics of the HVE accelerator systems and present as example recent systems.

  1. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    Energy Technology Data Exchange (ETDEWEB)

    Foerster, C.L.

    1995-12-31

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and we recently enjoyed a fully conditioned machine vacuum at design currents. A brief description of the X-Ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. After several hundred amp hours of stored beam current operation, very little improvement in machine performance was seen due to conditioning. Sections of the rings were vented, to dry nitrogen and replacement components were pre-baked and pre-argon glow conditioned prior to installation. Very little machine conditioning was needed to return to operation after recovering vacuum due to well established conditioning procedures. All straight sections in the X-Ray ring and the VUV ring have been filled with various insertion devices and most are fully operational. Each storage ring has a computer controlled total pressure and partial pressure monitoring system for the ring and its beam ports, to insure good vacuum.

  2. Acceleration theorems

    International Nuclear Information System (INIS)

    Palmer, R.

    1994-06-01

    Electromagnetic fields can be separated into near and far components. Near fields are extensions of static fields. They do not radiate, and they fall off more rapidly from a source than far fields. Near fields can accelerate particles, but the ratio of acceleration to source fields at a distance R, is always less than R/λ or 1, whichever is smaller. Far fields can be represented as sums of plane parallel, transversely polarized waves that travel at the velocity of light. A single such wave in a vacuum cannot give continuous acceleration, and it is shown that no sums of such waves can give net first order acceleration. This theorem is proven in three different ways; each method showing a different aspect of the situation

  3. Cold Vacuum Drying facility fire protection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) fire protection system (FPS). The FPS provides fire detection, suppression, and loss limitation for the CVDF structure, personnel, and in-process spent nuclear fuel. The system provides, along with supporting interfacing systems, detection, alarm, and activation instrumentation and controls, distributive piping system, isolation valves, and materials and controls to limit combustibles and the associated fire loadings

  4. On the mechanism of high-voltage discharge initiation in high-voltage accelerator accelerating tubes

    International Nuclear Information System (INIS)

    Zheleznikov, F.G.

    1983-01-01

    Experimental investigation into physical natupe of discharge processes in high-voltage accelerator accelerating tubes in the absence of the accelerated particle beam are conducted. The installation for the study of the mechanism of initiating vacuum isolation conductivity is used in the experiments. The vacuum chamber of the installation is made of steel and sealed with rubber packings. Electrodes 300-360 mm in diameter are made of stainless steel. Two variants of cleaning technology were used before electrode assembling: 1) degreasing by organic solvents; 2) cleaning by fine grinding cloth with successive washing by rectificated alcohol. Analysis of the obtained data shows that forma. tion of background flux of charged particles in interelectrode gap is caused by external photoelectric effect, excited by X radiation, which initiates the formation of intensive internal field in microfilms of non-conducting impurities on the electrode surfaces. The secondary electron emission plays the minor role at that

  5. Development of high performance negative ion sources and accelerators for MeV class neutral beam injectors

    International Nuclear Information System (INIS)

    Taniguchi, M.; Hanada, M.; Iga, T.

    2003-01-01

    Operation of accelerator at low pressure is an essential requirement to reduce stripping loss of the negative ions, which in turn results in high efficiency of the NB systems. For this purpose, a vacuum insulated beam source (VIBS) has been developed at JAERI, which reduces the gas pressure in the accelerator by enhanced gas conductance through the accelerator. The VIBS achieves the high voltage insulation of 1 MV by immersing the whole structure of accelerator in vacuum with long (∼ 1.8 m) insulation distance. Results of the voltage holding test using a long vacuum gap of 1.8 m indicate that a transition from vacuum discharge to gas discharge occurs at around 0.2 Pa m in the long vacuum gap. So far, the VIBS succeeded in acceleration of 20 mA (H - ) beam up to 970 keV for 1 s. The high voltage holding capability of the VIBS was drastically improved by installing a new large stress ring, which reduces electric field concentration at the triple junction of the accelerator column. At present the VIBS sustains 1 MV stably for more than 1200 s. Acceleration of ampere class H- beams at high current density is to be started soon to demonstrate ITER relevant beam optics. Operation of negative ion source at low pressure is also essential to reduce the stripping loss. However, it was not so easy to attain high current density H - ions at low pressure, since destruction cross section of the negative ions becomes large if the electron temperature is > 1 eV, in low pressure discharge. Using strong magnetic filter to lower the electron temperature, and putting higher arc discharge power to compensate reduction of plasma density through the filter, an H - ion beam of 310 A/m 2 was extracted at very low pressure of 0.1Pa. This satisfies the ITER requirement of current density at 1/3 of the ITER design pressure (0.3 Pa). (author)

  6. Recent results on cleaning and conditioning the ATF vacuum system

    International Nuclear Information System (INIS)

    Langley, R.A.; Clark, T.L.; Glowienka, J.C.

    1989-01-01

    Techniques for cleaning and conditioning the vacuum vessel of the Advanced Toroidal Facility (ATF) and its internal components are described. The vacuum vessel cleaning technique combines baking to 150/degree/C and glow discharges with hydrogen gas. Chromium gettering is used to further condition the system. The major internal components are the anodized aluminum baffles in the Thomson scattering system, a graphite-shielded ICRF antenna, two graphite limiters, and a diagnostic graphite plate. Three independent heating systems are used to bake some of the major components of the system. The major characteristics used for assessing cleanliness and conditioning progress are the maximum pressure attained during bakeout, the results of gas analysis, and relevant plasma parameters (e.g., time to radiative decay). Details of the various cleaning and conditioning procedures and results are presented. 5 refs., 8 figs., 3 tabs

  7. Vacuum-induced coherence in quantum dot systems

    Science.gov (United States)

    Sitek, Anna; Machnikowski, Paweł

    2012-11-01

    We present a theoretical study of vacuum-induced coherence in a pair of vertically stacked semiconductor quantum dots. The process consists in a coherent excitation transfer from a single-exciton state localized in one dot to a delocalized state in which the exciton occupation gets trapped. We study the influence of the factors characteristic of quantum dot systems (as opposed to natural atoms): energy mismatch, coupling between the single-exciton states localized in different dots, and different and nonparallel dipoles due to sub-band mixing, as well as coupling to phonons. We show that the destructive effect of the energy mismatch can be overcome by an appropriate interplay of the dipole moments and coupling between the dots which allows one to observe the trapping effect even in a structure with technologically realistic energy splitting of the order of milli-electron volts. We also analyze the impact of phonon dynamics on the occupation trapping and show that phonon effects are suppressed in a certain range of system parameters. This analysis shows that the vacuum-induced coherence effect and the associated long-living trapped excitonic population can be achieved in quantum dots.

  8. LHC vacuum system

    CERN Document Server

    Gröbner, Oswald

    1999-01-01

    The Large Hadron Collider (LHC) project, now in the advanced construction phase at CERN, comprises two proton storage rings with colliding beams of 7-TeV energy. The machine is housed in the existing LEP tunnel with a circumference of 26.7 km and requires a bending magnetic field of 8.4 T with 14-m long superconducting magnets. The beam vacuum chambers comprise the inner 'cold bore' walls of the magnets. These magnets operate at 1.9 K, and thus serve as very good cryo-pumps. In order to reduce the cryogenic power consumption, both the heat load from synchrotron radiation emitted by the proton beams and the resistive power dissipation by the beam image currents have to be absorbed on a 'beam screen', which operates between 5 and 20 K and is inserted inside the vacuum chamber. The design of this beam screen represents a technological challenge in view of the numerous and often conflicting requirements and the very tight mechanical tolerances imposed. The synchrotron radiation produces strong outgassing from the...

  9. Design and Construction of the NSTX Bakeout, Cooling and Vacuum Systems

    International Nuclear Information System (INIS)

    Dudek, L.E.; Kalish, M.; Gernhardt, R.; Parsells, R.F.; Blanchard, W.

    1999-01-01

    This paper will describe the design, construction and initial operation of the NSTX bakeout, water cooling and vacuum systems. The bakeout system is designed for two modes of operation. The first mode allows heating of the first wall components to 350 degrees C while the external vessel is cooled to 150 degrees C. The second mode cools the first wall to 150 degrees C and the external vessel to 50 degrees C. The system uses a low viscosity heat transfer oil which is capable of high temperature low pressure operation. The NSTX Torus Vacuum Pumping System (TVPS) is designed to achieve a base pressure of approximately 1x10 (superscript -8) Torr and to evacuate the plasma fuel gas loads in less than 5 minutes between discharges. The vacuum pumping system is capable of a pumping speed of approximately 3400 l/s for deuterium. The hardware consists of two turbo molecular pumps (TMPs) and a mechanical pump set consisting of a mechanical and a Roots blower pump. A PLC is used as the control system to provide remote monitoring, control and software interlock capability. The NSTX cooling water provides chilled, de ionized water for heat removal in the TF, OH and PF, power supplies, bus bar systems, and various diagnostics. The system provides flow monitoring via a PLC to prevent damage due to loss of flow

  10. Computer controlled vacuum control system for synchrotron radiation beam lines

    International Nuclear Information System (INIS)

    Goldberg, S.M.; Wang, C.; Yang, J.

    1983-01-01

    The increasing number and complexity of vacuum control systems at the Stanford Synchrotron Radiation Laboratory has resulted in the need to computerize its operations in order to lower costs and increase efficiency of operation. Status signals are transmitted through digital and analog serial data links which use microprocessors to monitor vacuum status continuously. Each microprocessor has a unique address and up to 256 can be connected to the host computer over a single RS232 data line. A FORTRAN program on the host computer will request status messages and send control messages via only one RS232 line per beam line, signal the operator when a fault condition occurs, take automatic corrective actions, warn of impending valve failure, and keep a running log of all changes in vacuum status for later recall. Wiring costs are thus greatly reduced and more status conditions can be monitored without adding excessively to the complexity of the system. Operators can then obtain status reports at various locations in the lab quickly without having to read a large number of meter and LED's

  11. Vacuum considerations: summary

    International Nuclear Information System (INIS)

    Blechschmidt, D.; Halama, H.J.

    1978-01-01

    A summary is given of the efforts of a vacuum systems study group of the workshop on a Heavy Ion Demonstration Experiment (HIDE) for heavy ion fusion. An inadequate knowledge of cross-sections prevents a more concrete vacuum system design. Experiments leading to trustworthy numbers for charge exchange, stripping and capture cross-sections are badly needed and should start as soon as possible. In linacs, beam loss will be almost directly proportional to the pressure inside the tanks. The tanks should, therefore, be built in such a way that they can be baked-out in situ to improve their vacuum, especially if the cross-sections turn out to be higher than anticipated. Using standard UHV techniques and existing pumps, an even lower pressure can be achieved. The vacuum system design for circular machines will be very difficult, and in some cases, beyond the present state-of-the-art

  12. Vacuum system for the LBL Advanced Light Source (ALS)

    International Nuclear Information System (INIS)

    Kennedy, K.; Henderson, T.; Meneghetti, J.

    1989-03-01

    A 1.5 to 1.9 GeV synchrotron light source is being built at LBL. The vacuum system is designed to permit most synchrotron photons to escape the electron channel and be absorbed in an antechamber. The gas generated by the photons hitting the absorbers in the antechambers will be pumped by titanium sublimation pumps located directly under the absorbers. The electron channel and the antechamber are connected by a 10-mm-high slot that offers good electrodynamic isolation of the two chambers of frequencies affecting the store electron orbit. Twelve 10-meter-long vessels constitute the vacuum chambers for all the lattice magnets. Each chamber will be machined from two thick plates of 5083-H321 aluminum and welded at the perimeter. Machining both the inside and outside of the vacuum chamber permits the use of complex and accurate surfaces. The use of thick plates allows flanges to be machined directly into the wall of each chamber, thus avoiding much welding. 1 ref., 3 figs

  13. Collective field accelerator

    International Nuclear Information System (INIS)

    Luce, J.S.

    1978-01-01

    A collective field accelerator which operates with a vacuum diode and utilizes a grooved cathode and a dielectric anode that operates with a relativistic electron beam with a ν/γ of approx. 1, and a plurality of dielectric lenses having an axial magnetic field thereabout to focus the collectively accelerated electrons and ions which are ejected from the anode. The anode and lenses operate as unoptimized r-f cavities which modulate and focus the beam

  14. New evaporator station for the center for accelerator target science

    Science.gov (United States)

    Greene, John P.; Labib, Mina

    2018-05-01

    As part of an equipment grant provided by DOE-NP for the Center for Accelerator Target Science (CATS) initiative, the procurement of a new, electron beam, high-vacuum deposition system was identified as a priority to insure reliable and continued availability of high-purity targets. The apparatus is designed to contain TWO electron beam guns; a standard 4-pocket 270° geometry source as well as an electron bombardment source. The acquisition of this new system allows for the replacement of TWO outdated and aging vacuum evaporators. Also included is an additional thermal boat source, enhancing our capability within this deposition unit. Recommended specifications for this system included an automated, high-vacuum pumping station, a deposition chamber with a rotating and heated substrate holder for uniform coating capabilities and incorporating computer-controlled state-of-the-art thin film technologies. Design specifications, enhanced capabilities and the necessary mechanical modifications for our target work are discussed.

  15. Study of ITER equatorial port plug handling system and vacuum sealing interface

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Jean-Pierre [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France)], E-mail: jean-pierre.martins@cea.fr; Doceul, Louis; Marol, Sebastien; Delchie, Elise [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France); Cordier, Jean-Jacques; Levesy, Bruno; Tesini, Alessandro [ITER International Organization, F-13108 Saint-Paul-lez-Durance cedex (France); Ciattaglia, Emanuela [EFDA CSU - Garching, Boltzmannstr. 2, D-85748 Garching (Germany); Tivey, Richard [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Gillier, Rene; Abbes, Christophe [GARLOCK - Sealing Technologies - 90, rue de la roche du Geai, F-42029 St-Etienne cedex 1 (France)

    2009-06-15

    In the field of the ITER port plug engineering and integration task, CEA has contributed to define proposals concerning the port plugs vacuum sealing interface with the vessel flange and the equatorial plug handling. The 2001 baseline vacuum flange sealing consisted of TIG welding of a 316L strip plate on to U shapes. This arrangement presented some issues like welding access, implementation of tools, lip consumption, complex local leak test, continuous leak checking. Therefore, an alternate sealing solution based on the use of metallic gaskets is proposed. The different technical aspects are discussed to explain how this design can simplify the maintenance and deal with safety and vacuum requirements. The design of the mechanical attachment and vacuum sealing of the plug has constantly evolved, but the associated remote handling equipment was not systematically reviewed. An update of the cask and maintenance procedure was studied in order to design it in accordance with the last generic plug flange design. This includes a concept of a gripping system that uses the plug flange bolting area and, to help the remote handling process, a cantilever assisting system is suggested to increase the reliability of the transfer operation between vacuum vessel and cask.

  16. Vacuum system for the Stanford-LBL storage ring (PEP)

    International Nuclear Information System (INIS)

    Bostic, D.; Cummings, U.; Dean, N.; Jeong, B.; Jurow, J.

    1975-03-01

    The vacuum system for PEP will be similar in design, construction and operation to the system currently in operation at SPEAR. There will, of course, be quantitative differences since the closed path of PEP will be 10 times longer than the SPEAR path. Some qualitative differences will also arise since the radiated synchrotron power for PEP will be about 13 times greater than for SPEAR giving rise to an increased linear power density incident on the chamber wall. Other differences arise from the higher energy spectrum of the synchrotron radiation. The SPEAR vacuum system has been in operation since April 1972 and has proven satisfactory in design, construction and operation. The chamber has been subject to synchrotron radiation for approximately 300 ampere-hours and beam lifetimes are now more than several hours. The details of the PEP design and the SPEAR operating experience will be further discussed in this paper. 1 ref., 4 figs

  17. TMX-Upgrade vacuum-system design and analysis

    International Nuclear Information System (INIS)

    Simonen, T.C.; Chargin, A.K.; Drake, R.P.; Nexsen, W.E.; Pickles, W.L.; Poulsen, P.; Stack, T.P.; Wong, R.L.

    1981-10-01

    This paper describes the design and analysis of the TMX Upgrade Vacuum System. TMX Upgrade is a modification of the TMX tandem mirror device. It will employ thermal barriers to further improve plasma confinement. Thermal barriers are produced by microwave heating and neutral-beam pumping. They increase the feasibility of tandem-mirror reactors by reducing both the required magnetic field strengths and the neutral-beam injection voltages

  18. Electron guns for accelerators

    International Nuclear Information System (INIS)

    Rangarajan, L.M.; Mahadevan, S.; Ramamurthi, S.S.

    1995-01-01

    The high voltage, high current electron guns developed elsewhere for Linacs are based on cathode pulsing with direct emitting cathodes. Our grid pulsed triode gun employs indirect emitting cathode pellet under electron bombardment or a direct cathode emitter. Electron beam from the gun is injected to the accelerator guide at 40 kV and pulse duration is 2.8μsec. The gun is limited to axially symmetric geometry and electron optical design is optimized by computer programming. The gun with a water cooled Faraday cup is connected to a vacuum system comprising of a sputter ion pump and sorption pump. Working pressure is 1x10 -6 Pa. Gun is designed to be baked as an assembly at temperatures of 400 degC while vacuum processing. Materials are therefore restricted to refractory metals, SS, OFHC copper and all the electrodes are housed inside a ceramic tube. Lower Z graphite is used as a base material of Faraday cup. Grid is non-intercepting modulator anode, a new feature introduced, as compared to meshed grid system by others. CAT gun delivers 160 mA current pulses at 40 kV and its working characteristics such as perveance, emittance and beam radius compare well with SLAC and Hermosa guns. The above guns can be used for electron beam machines such as medical Linacs, industrial accelerators and EB welding equipment. (author). 2 refs., 2 figs

  19. Accelerated vacuum testing of long life ball bearings and sliprings

    Science.gov (United States)

    Meeks, C. R.; Christy, R. I.; Cunningham, A. C.

    1971-01-01

    Extensive analytical studies and testing have been conducted on bearings and sliprings in vacuum at temperatures from 30 to 130 F. Thirty-six bearings lubricated with two types of oil were tested in vacuum of less than 10 to the minus 8th power torr at speeds from 55 to 180 rpm. Temperatures, load, speed, and oil viscosity were varied to evaluate the effects on life and wear. All bearings performed successfully during a 7-month test, and the potential merits of the two oils were compared. Over 25 different, dry-lubricated brush/slipring material combinations have been tested, with variations of brush and ring design and surface speed. Test results indicate the probability of 10 years or more of slipring and brush lifetime with properly designed brushes for 1-in.-diameter ring rotating at 60 rpm.

  20. Relaxed plasma-vacuum systems

    International Nuclear Information System (INIS)

    Spies, G.O.; Lortz, D.; Kaiser, R.

    2001-01-01

    Taylor's theory of relaxed toroidal plasmas (states of lowest energy with fixed total magnetic helicity) is extended to include a vacuum between the plasma and the wall. In the extended variational problem, one prescribes, in addition to the helicity and the magnetic fluxes whose conservation follows from the perfect conductivity of the wall, the fluxes whose conservation follows from the assumption that the plasma-vacuum interface is also perfectly conducting (if the wall is a magnetic surface, then one has the toroidal and the poloidal flux in the vacuum). Vanishing of the first energy variation implies a pressureless free-boundary magnetohydrostatic equilibrium with a Beltrami magnetic field in the plasma, and in general with a surface current in the interface. Positivity of the second variation implies that the equilibrium is stable according to ideal magnetohydrodynamics, that it is a relaxed state according to Taylor's theory if the interface is replaced by a wall, and that the surface current is nonzero (at least if there are no closed magnetic field lines in the interface). The plane slab, with suitable boundary conditions to simulate a genuine torus, is investigated in detail. The relaxed state has the same double symmetry as the vessel if, and only if, the prescribed helicity is in an interval that depends on the prescribed fluxes. This interval is determined in the limit of a thin slab

  1. An Examination of Resonance, Acceleration, and Particle Dynamics in the Micro-Accelerator Platform

    International Nuclear Information System (INIS)

    McNeur, Josh; Rosenzweig, J. B.; Travish, G.; Zhou, J.; Yoder, R.

    2010-01-01

    An effort to build a micron-scale dielectric-based slab-symmetric accelerator is underway at UCLA. The structure achieves acceleration via a resonant accelerating mode that is excited in an approximately 800 nm wide vacuum gap by a side coupled 800 nm laser. Detailed simulation results on structure fields and particle dynamics, using HFSS and VORPAL, are presented. We examine the quality factors of the accelerating modes for various structures and the excitations of non-accelerating destructive modes. Additionally, the results of an analytic and computational study of focusing, longitudinal dynamics and acceleration are described. Methods for achieving simultaneous transverse and longitudinal focusing are discussed, including modification of structure dimensions and slow variation of the coupling periodicity.

  2. The vacuum system reform and test of the super-critical 600mw unit

    Science.gov (United States)

    Yan, Tao; Wan, Zhonghai; Lu, Jin; Chen, Wen; Cai, Wen

    2017-11-01

    The deficiencies of the designed vacuum system of the super-critical unit is pointed out in this paper, and then it is reformed by the steam ejector. The experimental results show that the vacuum of the condenser can be improved, the coal consumption can be reduced and the plant electricity consumption can be lowered dramatically at a small cost of the steam energy consumption. Meanwhile, the water-ring vacuum pumps cavitation problems can be solved.

  3. A scheme of measurement of quantum-vacuum geometric phases in a noncoplanar fibre system

    International Nuclear Information System (INIS)

    Shen Jianqi

    2004-01-01

    We study the quantum-vacuum geometric phases resulting from the vacuum fluctuation of photon fields in a Tomita-Chiao-Wu noncoplanar curved fibre system, and suggest a scheme to test for the potential existence of such a vacuum effect. Since the signs of the quantum-vacuum geometric phases of left- and right-handed (LRH) circularly polarized light are opposite, the sum of the geometric phases at the vacuum level is necessarily zero in the fibre experiments performed previously by other authors. By using the present approach where a fibre made of gyroelectric media is employed, the quantum-vacuum geometric phases of LRH light cannot be exactly cancelled, and it may therefore be possible to test this experimentally. (letter to the editor)

  4. Design of the vacuum control system for DIII-D

    International Nuclear Information System (INIS)

    Campbell, G.L.; Callis, R.W.; Haskovec, J.S.; Heckman, E.J.; Moore, C.D.; Scoville, J.T.

    1986-01-01

    The vacuum control and instrumentation for the DIII-D upgrade was designed using a new large programmable controller with color graphic operator interfaces and intelligent distributed devices. Remote, optically isolated input and output is used as well as optical isolation for the operator and programming consoles. Gate valves between experimental equipment and the vacuum vessel are interlocked for machine safety by an intelligent interface based upon a commercially available microcontroller card. Complete automatic operation with capability for remote operator intervention was one goal of this design effort. The design of the system with emphasis on the graphics, optical isolation and microcontroller implementation will be discussed

  5. Development of Power System for Medium Energy Accelerator

    International Nuclear Information System (INIS)

    Kwon, Hyeok Jung; Kim, Dae Il; Kim, Han Sung; Seol, Kyung Tae; Jang, Ji Ho; Cho, Yong Sub; Hong, In Seok; Kim, Kyung Ryul

    2008-05-01

    The main goal of the studies are to develop a power supply system used for 100MeV proton accelerator and to operate 20MeV accelerator which has been installed in KAERI site. The 100MeV proton accelerator uses RF cavity to accelerate beams and need RF amplifier, klystron. To operate the klystron, a high power pulse power supply is required and the power supply system should have high quality because the reliability of the power supply has critical impact on the overall reliability of accelerator system. Therefore, high power pulse power system and related technology development are inevitable for 100MeV accelerator system development. 20MeV accelerator system has been developed and installed in KAERI site, which will be used as an injector for 100MeV accelerator and supply 20MeV beam to users. A study on the 20MeV accelerator characteristics should be performed to operate the machine efficiently. In addition, this machine can be used as a test bench for developing the 100MeV accelerator components. Therefore, not only the hardware so called 'high voltage power supply', but the related technology of the high quality high voltage power system and man power can be obtained from the results of this studies. The test results of the 20MeV accelerator can be utilized as a basis for efficient operation of 100MeV accelerator and these are the ultimate objective and necessities of the study

  6. Technological plasma source equipped with combined system of vacuum-arc discharge initiation

    International Nuclear Information System (INIS)

    Sysoev, Yu.O.

    2013-01-01

    The construction and the operation principle of erosion plasma source with a three-stage system of vacuum-arc discharge excitation is described. As first two step was used the modified contactless start system with plasma injector, which was widely used in standard plasma sources of the ''Bulat'' systems. The operation principle of the third stage was based on the transition of glow discharge to arc discharge. Coordinated operation of three stages during various stages of coating deposition provided significant increasing of service life and reliability of the system of vacuum-arc discharge initiation and extended the functionality of the plasma source

  7. Nitrogen pressure in a vacuum system

    International Nuclear Information System (INIS)

    Edwards, D. Jr.

    1977-01-01

    Since the N 2 outgassing rate from walls of a vacuum system is generally recognized to be very small, the presence of a N 2 pressure in the system is a useful indication of the presence of real leaks to the atmosphere. A technique of thermal desorption mass spectrometry is introduced which allows the N 2 pressure in the background gas of a baked system to be separated from a CH 4 background to a minimum level of N 2 detectability of approximately 1 percent of the CO background pressure. In typical baked systems (of which an example is given), it is possible to readily determine the sum of all real N 2 leaks to atmosphere at a level of approximately 10 -11 Torr liter/s. This feature makes the technique ideally suited to large complex systems since the leak rate can be evaluated before detailed leak finding procedures are initiated

  8. AI systems approach in particle accelerators

    International Nuclear Information System (INIS)

    Kataria, S.K.; Bhagwat, P.V.; Kori, S.A.

    1992-01-01

    The large particle accelerators machines like pelletron accelerator at Tata Institute of Fundamental Research (T.I.F.R) have several levels of controls with operators responsible for overall global control decisions and closed loop feedback controllers for relatively small subsystems of the machines. As the accelerator machines are becoming more complicated and the requirements more stringent, there is a need to provide the operators with an artificial intelligence (AI) system to aid in the tuning the machine and in failure diagnosis. There are few major areas in the pelletron operation, which can be done more efficiently using AI systems approach so that useful beam is available for much more time: 1) Accelerator Conditioning, 2) Accelerator Tuning, and 3) Maintaining the Tune beams. The feasibility study for using expert system for above areas and also for safety evaluation of the various subsystems is carried out. (author). 10 refs., 4 figs

  9. Cold Vacuum Drying Facility Crane and Hoist System Design Description. System 14

    International Nuclear Information System (INIS)

    TRAN, Y.S.

    2000-01-01

    This system design description (SDD) is for the Cold Vacuum Drying (CVD) Facility overhead crane and hoist system. The overhead crane and hoist system is a general service system. It is located in the process bays of the CVD Facility, supports the processes required to drain the water and dry the spent nuclear fuel (SNF) contained in the multi-canister overpacks (MCOs) after they have been removed from the K-Basins. The location of the system in the process bay is shown

  10. Tests of a vacuum breaker for the FTU commutation system

    International Nuclear Information System (INIS)

    Andreani, R.; Lovisetto, L.; Cornago, F.

    1984-01-01

    A two poles vacuum breaker, equipped with saturable inductances and capacitor banks to produce an artificial current zero, appears the most suitable solution to satisfy these requirements with high reliability of operation and limited maintenance. Two series of tests have been conducted to evaluate the performance and reliability of the system and in particular the erosion of the electrodes as a function of number of operations. The test results have been very satisfactory. At least 1000 full power pulses can be envisaged before replacing the vacuum bottles. (author)

  11. Vacuum fused deposition modelling system to improve tensile ...

    African Journals Online (AJOL)

    In the printing process, the interlayer bonding is made too quick thus the layers are not fully fused together causing the reduced tensile strength. This paper presents a possible solution to this problem by incorporating vacuum technology in FDM system to improve tensile strength of 3D printed specimens. In this study, a ...

  12. Electron beam accelerator energy control system

    International Nuclear Information System (INIS)

    Sharma, Vijay; Rajan, Rehim; Acharya, S.; Mittal, K.C.

    2011-01-01

    A control system has been developed for the energy control of the electron beam accelerator using PLC. The accelerating voltage of 3 MV has been obtained by using parallel coupled voltage multiplier circuit. A autotransformer controlled variable 0-10 KV DC is fed to a tube based push pull oscillator to generate 120 Khz, 10 KV AC. Oscillator output voltage is stepped up to 0-300 KV/AC using a transformer. 0-300 KVAC is fed to the voltage multiplier column to generate the accelerating voltage at the dome 0-3 MV/DC. The control system has been designed to maintain the accelerator voltage same throughout the operation by adjusting the input voltage in close loop. Whenever there is any change in the output voltage either because of beam loading or arcing in the accelerator. The instantaneous accelerator voltage or energy is a direct proportional to 0-10 KVDC obtained from autotransformer. A PLC based control system with user settable energy level has been installed for 3 MeV, EB accelerator. The PLC takes the user defined energy value through a touch screen and compares it to the actual accelerating voltage (obtained using resistive divider). Depending upon the error the PLC generates the pulses to adjust the autotransformer to bring the actual voltage to the set value within the window of error (presently set to +/- 0.1%). (author)

  13. Criteria for vacuum breakdown in rf cavities

    International Nuclear Information System (INIS)

    Peter, W.; Faehl, R.J.; Kadish, A.; Thode, L.E.

    1983-01-01

    A new high-voltage scaling based on Kilpatrick's criterion is presented that suggests that voltages more than twice the Kilpatrick limit can be obtained with identical initial conditions of vacuum and surface cleanliness. The calculations are based on the experimentally observed decrease in secondary electron emission with increasing ion-impact energy above 100 keV. A generalized secondary-emission package has been developed to simulate actual cavity dynamics in conjunction with our 2 1/2-dimensional fully electromagnetic particle-in-cell code CEMIT. The results are discussed with application to the suppression of vacuum breakdown in rf accelerator devices

  14. Safety Analysis in Large Volume Vacuum Systems Like Tokamak: Experiments and Numerical Simulation to Analyze Vacuum Ruptures Consequences

    Directory of Open Access Journals (Sweden)

    A. Malizia

    2014-01-01

    Full Text Available The large volume vacuum systems are used in many industrial operations and research laboratories. Accidents in these systems should have a relevant economical and safety impact. A loss of vacuum accident (LOVA due to a failure of the main vacuum vessel can result in a fast pressurization of the vessel and consequent mobilization dispersion of hazardous internal material through the braches. It is clear that the influence of flow fields, consequence of accidents like LOVA, on dust resuspension is a key safety issue. In order to develop this analysis an experimental facility is been developed: STARDUST. This last facility has been used to improve the knowledge about LOVA to replicate a condition more similar to appropriate operative condition like to kamaks. By the experimental data the boundary conditions have been extrapolated to give the proper input for the 2D thermofluid-dynamics numerical simulations, developed by the commercial CFD numerical code. The benchmark of numerical simulation results with the experimental ones has been used to validate and tune the 2D thermofluid-dynamics numerical model that has been developed by the authors to replicate the LOVA conditions inside STARDUST. In present work, the facility, materials, numerical model, and relevant results will be presented.

  15. Insulation vacuum and beam vacuum overpressure release

    CERN Document Server

    Parma, V

    2009-01-01

    There is evidence that the incident of 19th September caused a high pressure build-up inside the cryostat insulation vacuum which the existing overpressure devices could not contain. As a result, high longitudinal forces acting on the insulation vacuum barriers developed and broke the floor and the floor fixations of the SSS with vacuum barriers. The consequent large longitudinal displacements of the SSS damaged chains of adjacent dipole cryo-magnets. Estimates of the helium mass flow and the pressure build- up experienced in the incident are presented together with the pressure build-up for an even more hazardous event, the Maximum Credible Incident (MCI). The strategy of limiting the maximum pressure by the installation of addition pressure relieve devices is presented and discussed. Both beam vacuum lines were ruptured during the incident in sector 3-4 giving rise to both mechanical damage and pollution of the system. The sequence, causes and effects of this damage will be briefly reviewed. We will then an...

  16. Ion exchange currents in vacuum accelerator tubes

    International Nuclear Information System (INIS)

    Eastham, D.A.; Thorn, R.

    1978-01-01

    Ion exchange currents (microdischarges) have been observed in short lengths of accelerator tube. The occurrence of these discharges can be related to the trajectories of ions in the tube. High-resolution mass spectra of the negative and positive ion components have been obtained. (author)

  17. Systems and methods for the magnetic insulation of accelerator electrodes in electrostatic accelerators

    Science.gov (United States)

    Grisham, Larry R

    2013-12-17

    The present invention provides systems and methods for the magnetic insulation of accelerator electrodes in electrostatic accelerators. Advantageously, the systems and methods of the present invention improve the practically obtainable performance of these electrostatic accelerators by addressing, among other things, voltage holding problems and conditioning issues. The problems and issues are addressed by flowing electric currents along these accelerator electrodes to produce magnetic fields that envelope the accelerator electrodes and their support structures, so as to prevent very low energy electrons from leaving the surfaces of the accelerator electrodes and subsequently picking up energy from the surrounding electric field. In various applications, this magnetic insulation must only produce modest gains in voltage holding capability to represent a significant achievement.

  18. Tesla-transformer-type electron beam accelerator

    International Nuclear Information System (INIS)

    Liu Jinliang; Zhong Huihuang; Tan Qimei; Li Chuanlu; Zhang Jiande

    2002-01-01

    An electron-beam Tesla-transformer accelerator is described. It consists of the primary storage energy system. Tesla transformer, oil Blumlein pulse form line, and the vacuum diode. The experiments of initial stage showed that diode voltage rises up to about 500 kV with an input of 20 kV and the maximum electron-beam current is about 9 kA, the pulse width is about 50 ns. This device can operate stably and be set up easily

  19. Electromagnetic Wave Propagation Through the ZR Z-Pinch Accelerator

    International Nuclear Information System (INIS)

    Rose, D. V.; Welch, D. R.; Madrid, E. A.; Miller, C. L.; Clark, R. E.; Stygar, W. A.; Struve, K.; Corcoran, P. A.; Whitney, B.

    2009-01-01

    A fully three-dimensional electromagnetic model of the major pulsed power components of the 26-MA ZR accelerator is presented. This large-scale simulation model tracks the evolution of electromagnetic waves through the intermediate storage capacitors, laser-triggered gas switches, pulse-forming lines, water switches, tri-plate transmission lines, and water convolute to the vacuum insulator stack. The plates at the insulator stack are coupled to a transmission line circuit model of the four-level magnetically-insulated transmission line section and post-hole convolutes. The vacuum section circuit model is terminated by either a short-circuit load or dynamic models of imploding z-pinch loads. The simulations results are compared with electrical measurements made throughout the ZR accelerator and good agreement is found, especially for times before and up to peak load power. This modeling effort represents new opportunities for modeling existing and future large-scale pulsed power systems used in a variety of high energy density physics and radiographic applications.

  20. Night vision imaging system design, integration and verification in spacecraft vacuum thermal test

    Science.gov (United States)

    Shang, Yonghong; Wang, Jing; Gong, Zhe; Li, Xiyuan; Pei, Yifei; Bai, Tingzhu; Zhen, Haijing

    2015-08-01

    The purposes of spacecraft vacuum thermal test are to characterize the thermal control systems of the spacecraft and its component in its cruise configuration and to allow for early retirement of risks associated with mission-specific and novel thermal designs. The orbit heat flux is simulating by infrared lamp, infrared cage or electric heater. As infrared cage and electric heater do not emit visible light, or infrared lamp just emits limited visible light test, ordinary camera could not operate due to low luminous density in test. Moreover, some special instruments such as satellite-borne infrared sensors are sensitive to visible light and it couldn't compensate light during test. For improving the ability of fine monitoring on spacecraft and exhibition of test progress in condition of ultra-low luminous density, night vision imaging system is designed and integrated by BISEE. System is consist of high-gain image intensifier ICCD camera, assistant luminance system, glare protect system, thermal control system and computer control system. The multi-frame accumulation target detect technology is adopted for high quality image recognition in captive test. Optical system, mechanical system and electrical system are designed and integrated highly adaptable to vacuum environment. Molybdenum/Polyimide thin film electrical heater controls the temperature of ICCD camera. The results of performance validation test shown that system could operate under vacuum thermal environment of 1.33×10-3Pa vacuum degree and 100K shroud temperature in the space environment simulator, and its working temperature is maintains at 5° during two-day test. The night vision imaging system could obtain video quality of 60lp/mm resolving power.

  1. Spent nuclear fuel project cold vacuum drying facility process water conditioning system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Process Water Conditioning (PWC) System. The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), the HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the PWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  2. Degradation kinetics of cyanidin 3-O-glucoside and cyanidin 3-O-rutinoside during hot air and vacuum drying in mulberry (Morus alba L.) fruit: A comparative study based on solid food system.

    Science.gov (United States)

    Zhou, Mo; Chen, Qinqin; Bi, Jinfeng; Wang, Yixiu; Wu, Xinye

    2017-08-15

    The aim of this study is to ascertain the degradation kinetic of anthocyanin in dehydration process of solid food system. Mulberry fruit was treated by hot air and vacuum drying at 60 and 75°C. The contents of cyanidin 3-O-glucoside and cyanidin 3-O-rutinoside were determined by using high performance liquid chromatography. Kinetic and thermodynamic parameters were calculated for analysing the degradation characteristics. Model fitting results showed monomeric anthocyanin degradations were followed the second-order kinetic. Vacuum drying presented high kinetic rate constants and low t 1/2 values. Thermodynamic parameters including the activation energy, enthalpy change and entropy change appeared significant differences between hot air and vacuum drying. Both heating techniques showed similar effects on polyphenol oxidase activities. These results indicate the anthocyanin degradation kinetic in solid food system is different from that in liquid and the oxygen can be regarded as a catalyst to accelerate the degradation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Vacuum Bellows, Vacuum Piping, Cryogenic Break, and Copper Joint Failure Rate Estimates for ITER Design Use

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader

    2010-06-01

    The ITER international project design teams are working to produce an engineering design in preparation for construction of the International Thermonuclear Experimental Reactor (ITER) tokamak. During the course of this work, questions have arisen in regard to safety barriers and equipment reliability as important facets of system design. The vacuum system designers have asked several questions about the reliability of vacuum bellows and vacuum piping. The vessel design team has asked about the reliability of electrical breaks and copper-copper joints used in cryogenic piping. Research into operating experiences of similar equipment has been performed to determine representative failure rates for these components. The following chapters give the research results and the findings for vacuum system bellows, power plant stainless steel piping (amended to represent vacuum system piping), cryogenic system electrical insulating breaks, and copper joints.

  4. At site qualification of accelerating tube dynodes

    International Nuclear Information System (INIS)

    Rajan, Rehim N.; Dewangan, S.; Sharma, D.K.

    2015-01-01

    A dc electron beam accelerator rated for 3 MeV encountered numerous vacuum side discharges at terminal voltage levels of 1800 kV. The cumulative rating of the accelerating tube in the system is 3350 kV. Pulsed currents in the order of 50 mA has been observed at the beam collector during these events along with voltage dips in terminal voltage. As dynode to dynode arcing is suspected to be the primary cause of this behaviour, it is desired to test the voltage withstanding capacity of each pair of dynodes. The accelerating tubes are rated for 335 kV at 6 kg/cm 2 SF 6 environment. However working at these pressures and testing of individual pairs of dynodes are impractical for qualification of dynodes of the 10 sets of accelerating tubes mounted in the accelerator. This problem has been overcome by using atmospheric pressure SF 6 and solid dielectrics. Experience of at site testing of the accelerating tube dynodes are described in this paper. (author)

  5. Plasma expansion into vacuum with charge separation effect

    International Nuclear Information System (INIS)

    Murakami, Masakatsu

    2008-01-01

    Plasma expansion into vacuum and resultant ion acceleration are studied theoretically. A new self-similar solution is found to describe free expansion of a finite plasma mass into vacuum with a full account of charge separation effects. It is argued that the normalized plasma size Λ R/λ D plays the dominant role in determining the whole ion energy spectrum and thus the maximum ion kinetic energy, where R and λ D are the plasma scale length and the Debye length, respectively. The analytical model is compared with experiments to show excellent agreement

  6. Status report on the accelerators operation

    International Nuclear Information System (INIS)

    Biri, S.; Kormany, Z.; Berzi, I.; Racz, R.

    2011-01-01

    vacuum measurement system that is based on two Pfeiffer MaxiGauge control units, has the following features: receiving and presenting data of 12 vacuum measurement heads, switching on/off the heads, writing continuous log of the vacuum data of VdG-5 accelerator tube. The hardware development of the quadrupole control system was finished in the first half of 2011. In September we started to collect data with Quadrupole- Control software to increase the efficiency of beam transport with recalling stored parameters. It has the following features: control of 1 electrostatic and 3 magnetic quadrupole dublet power supplies (Figure 1), storing/recalling of operating parameters, reading from two beamon- target current meters, VdG-5 beam energy versus analyzing magnet calculator. In 2011 the VdG-1 machine was working for only 84 hours. There were some test measurements with proton beam for a time-of-flight electron-spectrometer. (author)

  7. Vacuum mechatronic laser alignment system on the Nova laser

    International Nuclear Information System (INIS)

    Holliday, M.; Wong, K.; Shelton, R.

    1991-11-01

    The experiments conducted on NOVA are done to investigate inertially confined laser fusion reactions. To this end, the ten beams of the laser are aligned to within 30mm. The target chamber employs a vacuum mechatronic based reticle/target positioning system to accomplish this. It is a five degree-of-freedom chamber resident system, known as the Alignment Aids Positioner or AAP. The AAP aids in beam and diagnostic alignment by accurately positioning a reticle at target chamber center to with 7mm. The AAP system increases target positioning and alignment flexibility and accuracy through the use of a computer controlled multi degree-of-freedom stage assembly. This device uses microstepping DC stepper motors with encoders to achieve closed loop control in a 10 -6 torr vacuum. The AAP has two positioning regimes to move the alignment reticle and do beam alignment. One is course positioning in the Y-Z plane that moves a high resolution stage assembly to target chamber center. The other regime is high resolution movement in the X,Y,Z and q directions. 5 refs., 9 figs

  8. Automated System for Control of the Vacuum Diagnostic System for the TJ-II

    International Nuclear Information System (INIS)

    Lopez Sanchez, A.; Montoro Peinado, A.; Encabo Fernandez, J.; Gama de la Serrano, J.; Sanchez Sarabia, E.

    1999-12-01

    This report describes the monitoring and remote control systems belonging to the high vacuum systems of the TJ-II diagnostics. These systems are part of each diagnostic and their control has been integrated into the automata that carries out this task. All the controllers are connected through a Profibus network, so as to interchange data between themselves as well as between the general system of TJ-II. (Author)

  9. Vacuum Mechatronics And Insvection For Self-Contained Manufacturing

    Science.gov (United States)

    Belinski, Steve E.; Shirazi, Majid; Seidel, Thomas E.; Hackwood, Susan

    1990-02-01

    The vacuum environment is increasingly being used in manufacturing operations, especially in the semiconductor industry. Shrinking linewidths and feature sizes dictate that cleanliness standards become continually more strict. Studies at the Center for Robotic Systems in Microelectronics (CRSM) indicate that a controlled vacuum enclosure can provide a superior clean environment. In addition, since many microelectronic fabrication steps are already carried out under vacuum, self-contained multichamber processing systems are being developed at a rapid pace. CRSM support of these systems includes the development of a research system, the Self-contained Automated Robotic Factory (SCARF), a vacuum-compatible robot, and investigations of particulate characterization in vacuum and inspection for multichamber systems. Successful development of complex and expensive multichamber systems is, to a great extent, dependent upon the discipline called vacuum mechatronics, which includes the design and development of vacuum-compatible computer-controlled mechanisms for manipulating, sensing and testing in a vacuum environment. Here the constituents of the vacuum mechatronics discipline are defined and reviewed in the context of the importance to self-contained in-vacuum manufacturing.

  10. Remote monitoring of vacuum and valve status using LabVIEW

    International Nuclear Information System (INIS)

    Rozario, C.; Pal, S.; Nanal, V.; Pillay, R.G.

    2015-01-01

    For remote monitoring of vacuum status in LINAC and associated beam transport lines, a LabVIEW based interface through RS232 communication is developed. All vacuum stations in LINAC are equipped with Pfeiffer pressure measurement units, namely, TPQ 262 (for 2 no.s) and TPG256 (for 6 no.s). The communication to the unit is done via RS232 with the Serial Device Server. The electro-pneumatic gate valves separating beam line sections and cryostats are fitted with limit switches for indicating open/close status. A modular unit based on PIC 18F4520 microcontroller is developed to read the limit switch positions of up to 10 valves. Both the vacuum readout unit and the gate valve monitor unit act as a server to the client PC on the console. Each unit is assigned a unique IP address and connected to the TCP/IP Ethernet bus. The LabVIEW Virtual Instrument based TCP/IP is used for communication through the distributed LAN. It is possible to connect additional client PCs using the LabVIEW Remote Console features. During the accelerator operation the vacuum reading of the gauge and the status of valves can be monitored from the control room console. All the vacuum parameters like gauge value and status at different physical locations are scanned and logged approximately every second. The LabVIEW GUI has helped in making the system user friendly and can be expanded easily. (author)

  11. Cold Vacuum Drying facility deionized water system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) de-ionized water system. The de-ionized water system is used to provide clean, conditioned water, free from contaminants, chlorides and iron for the CVD Facility. Potable water is supplied to the deionized water system, isolated by a backflow prevention device. After the de-ionization process is complete, via a packaged de-ionization unit, de-ionized water is supplied to the process deionization unit

  12. Modernization of electron accelerator on the base of the RUP-400 x-ray unit

    International Nuclear Information System (INIS)

    Buslaev, I.I.; Kon'kov, N.G.; Kochetov, O.N.; Krylov, S.Yu.; Nikolaev, S.M.

    1976-01-01

    A device has been designed enabling one to change directly from the control panel relation of high to low energy electrons in the beam with a view to up-date a linear electron accelerator. The device comprises a high-voltage transformer accommodating an accelerating tube of the vacuum system with a titanium pump and a scanner. 1.5 BPV-2-400 X-ray tube with a renewable cathode is used as an accelerating tube. As a result of these modifications the accelerator has become smaller and not so heavy. Its characteristics on material irradiation have also improved

  13. New Possibilities of the FLNR Accelerator Complex for the Production of Track Membranes

    CERN Document Server

    Oganessian, Yu T; Didyk, A Yu; Gulbekyan, G G; Kutner, V B

    2000-01-01

    The description of the main systems of modified heavy ion accelerator U-400 of the Flerov Laboratory of Nuclear Reactions is presented including the ECR ion source, system of external injection of low energy ions onto median plane. The characteristic parameters for obtaining of accelerated heavy ions from krypton ions to more heavier ones also are presented. The structure and parameters of new beam line and vacuum chamber for irradiation of polymeric and other materials on modified cyclotron U-400 are presented too. The new possibilities for the production of unique track membrane are discussed.

  14. Operational characteristics of VEC vacuum system

    International Nuclear Information System (INIS)

    Viswanadham, C.; Bhavsar, S.T.; Bose, D.K.; Chintalapudi, S.N.; Das, S.K.; Tiwary, S.D.

    1979-01-01

    The main vacuum system of the Variable Energy Cyclotron which has been built indigenously has fulfilled the requirements for the smooth operation of the machine. By running two 88.9 cm diffusion pumps with freon cooled baffles and backed by 600 l/m rotary pumps, a pressure of 5 x 10 -6 torr in absence of the beam and 1 x 10 -5 torr in presence of the beam is readily achieved in the 23 m 3 volume. Various means have been adopted to maintain the system in order and contamination-free, by maintaining a pressure level of 1 x 10 -4 torr throughout the working week by a 30 cm diffusion pump, which can run even on emergency power. Cryopanels have also been installed and tried out. Details of pump-down characteristics and system performance are discussed. (auth.)

  15. Vacuum Pumping Performance Comparison of Non-Evaporable Getter Thin Films Deposited Using Argon and Krypton as Sputtering Gases

    CERN Document Server

    Liu, Xianghong; He, Yun; Li, Yulin

    2005-01-01

    Owing to the outstanding vacuum performance and the low secondary electron yield, non-evaporable getter (NEG) thin film deposited onto interior walls has gained widespread acceptance and has been incorporated into many accelerator vacuum system designs. The titanium-zirconium-vanadium (T-Zr-V) NEG thin films were deposited onto the interior wall of stainless steel pipes via DC magnetron sputtering method using either argon or krypton gas as sputtering gas. Vacuum pumping evaluation tests were carried out to compare vacuum pumping performances of the Ti-Zr-V NEG thin films deposited using argon or krypton. The results showed much higher initial pumping speed for the Kr-sputtered NEG film than the Ar-sputtered film, though both films have similar activation behavior. The compositions and textures of both thin films were measured to correlate to the pumping performances.

  16. Accelerator control systems in China

    International Nuclear Information System (INIS)

    Yao Chihyuan

    1992-01-01

    Three accelerator facilities were built in the past few years, the 2.8 GeV electron positron collider BEPC, the heavy ion SSC cyclotron accelerator HIRFL and the 800 MeV synchrotron radiation storage ring HESYRL. Aimed at different research areas, they represent a new generation of accelerator in China. This report describes the design philosophy, the structure, performance as well as future improvements of the control systems of the these facilities. (author)

  17. Ecton mechanism of ion flow generation in vacuum arc

    CERN Document Server

    Mesyats, G A

    2001-01-01

    The basic characteristics of cathode plasma generation in vacuum arc (ion erosion, ion average charge) were studied from the point of an ecton model of a cathode spot in vacuum arc. The estimates of ion parameters obtained for a single cell of a cathode spot show qualitative conformity with the experimental data. One introduces the following mechanism of cathode plasma generation in vacuum arc. In case of explosion-like destruction of a cathode segment under the effect of the Joule heating the cathode matter changes sequentially its state: condensed one, nonideal and ideal plasma ones. During this change one observes formation of plasma charge composition and ion acceleration under the effect of plasma pressure gradient

  18. Baking of tandem accelerator tube by low voltage arc discharge

    International Nuclear Information System (INIS)

    Nakajima, Yutaka

    1982-01-01

    In designing the accelerating tube for a static tandem accelerator in Kyushu University, the basic policy was as described below: individual unit composing the accelerating tube should fully withstand the electric field of 2 MV/m, and electric discharge must not be propagated from one unit to the adjacent unit when these are assembled to the accelerating tube. The accelerating tube units are each 25 cm in length, and both high and low energy sides are composed of 20 units, respectively. Although about 10 -9 Torr vacuum was obtained at the both ends of the accelerating tube by baking the tube at 300 to 350 deg C with electric heaters wound outside the tube in the conventional method, vast outgas was generated, which decreased vacuum by two or three figures if breakdown occurred through the intermediary of outgas. As a method of positively outgassing and cleaning the electrodes inside the accelerating tube, it was attempted to directly bake all the electrodes in the accelerating tube by causing strong arc discharge flowing H 2 gas in the tube. As a result of considering the conditions for this method, the low voltage arc discharge was employed using oxide cathodes. Thus, after implementing 10A arc discharge for several hours, the voltage was able to be raised to 10 MV almost immediately after the vacuum recovery, and further, after another conditioning for several hours, it was successful to raise voltage up to 11 MV. (Wakatsuki, Y.)

  19. Femtosecond electron-bunch dynamics in laser wakefields and vacuum

    Directory of Open Access Journals (Sweden)

    A. G. Khachatryan

    2007-12-01

    Full Text Available Recent advances in laser wakefield acceleration demonstrated the generation of extremely short (with a duration of a few femtoseconds relativistic electron bunches with relatively low (of the order of couple of percent energy spread. In this article we study the dynamics of such bunches in drift space (vacuum and in channel-guided laser wakefields. Analytical solutions were found for the transverse coordinate of an electron and for the bunch envelope in the wakefield in the case of arbitrary change in the energy. Our results show strong bunch dynamics already on a millimeter scale propagation distance both in plasma and in vacuum. When the bunch propagates in vacuum, its transverse sizes grow considerably; the same is observed for the normalized bunch emittance that worsens the focusability of the bunch. A scheme of two-stage laser wakefield accelerator with small drift space between the stages is proposed. It is found that fast longitudinal betatron phase mixing occurs in a femtosecond bunch when it propagates along the wakefield axis. When bunch propagates off axis, strong bunch decoherence and fast emittance degradation due to the finite bunch length was observed.

  20. In-situ measurements of the secondary electron yield in an accelerator environment: Instrumentation and methods

    International Nuclear Information System (INIS)

    Hartung, W.H.; Asner, D.M.; Conway, J.V.; Dennett, C.A.; Greenwald, S.; Kim, J.-S.; Li, Y.; Moore, T.P.; Omanovic, V.; Palmer, M.A.; Strohman, C.R.

    2015-01-01

    The performance of a particle accelerator can be limited by the build-up of an electron cloud (EC) in the vacuum chamber. Secondary electron emission from the chamber walls can contribute to EC growth. An apparatus for in-situ measurements of the secondary electron yield (SEY) in the Cornell Electron Storage Ring (CESR) was developed in connection with EC studies for the CESR Test Accelerator program. The CESR in-situ system, in operation since 2010, allows for SEY measurements as a function of incident electron energy and angle on samples that are exposed to the accelerator environment, typically 5.3 GeV counter-rotating beams of electrons and positrons. The system was designed for periodic measurements to observe beam conditioning of the SEY with discrimination between exposure to direct photons from synchrotron radiation versus scattered photons and cloud electrons. The samples can be exchanged without venting the CESR vacuum chamber. Measurements have been done on metal surfaces and EC-mitigation coatings. The in-situ SEY apparatus and improvements to the measurement tools and techniques are described

  1. In-situ measurements of the secondary electron yield in an accelerator environment: Instrumentation and methods

    Energy Technology Data Exchange (ETDEWEB)

    Hartung, W.H., E-mail: wh29@cornell.edu; Asner, D.M.; Conway, J.V.; Dennett, C.A.; Greenwald, S.; Kim, J.-S.; Li, Y.; Moore, T.P.; Omanovic, V.; Palmer, M.A.; Strohman, C.R.

    2015-05-21

    The performance of a particle accelerator can be limited by the build-up of an electron cloud (EC) in the vacuum chamber. Secondary electron emission from the chamber walls can contribute to EC growth. An apparatus for in-situ measurements of the secondary electron yield (SEY) in the Cornell Electron Storage Ring (CESR) was developed in connection with EC studies for the CESR Test Accelerator program. The CESR in-situ system, in operation since 2010, allows for SEY measurements as a function of incident electron energy and angle on samples that are exposed to the accelerator environment, typically 5.3 GeV counter-rotating beams of electrons and positrons. The system was designed for periodic measurements to observe beam conditioning of the SEY with discrimination between exposure to direct photons from synchrotron radiation versus scattered photons and cloud electrons. The samples can be exchanged without venting the CESR vacuum chamber. Measurements have been done on metal surfaces and EC-mitigation coatings. The in-situ SEY apparatus and improvements to the measurement tools and techniques are described.

  2. Photonic Crystal Laser-Driven Accelerator Structures

    International Nuclear Information System (INIS)

    Cowan, Benjamin M.

    2007-01-01

    Laser-driven acceleration holds great promise for significantly improving accelerating gradient. However, scaling the conventional process of structure-based acceleration in vacuum down to optical wavelengths requires a substantially different kind of structure. We require an optical waveguide that (1) is constructed out of dielectric materials, (2) has transverse size on the order of a wavelength, and (3) supports a mode with speed-of-light phase velocity in vacuum. Photonic crystals---structures whose electromagnetic properties are spatially periodic---can meet these requirements. We discuss simulated photonic crystal accelerator structures and describe their properties. We begin with a class of two-dimensional structures which serves to illustrate the design considerations and trade-offs involved. We then present a three-dimensional structure, and describe its performance in terms of accelerating gradient and efficiency. We discuss particle beam dynamics in this structure, demonstrating a method for keeping a beam confined to the waveguide. We also discuss material and fabrication considerations. Since accelerating gradient is limited by optical damage to the structure, the damage threshold of the dielectric is a critical parameter. We experimentally measure the damage threshold of silicon for picosecond pulses in the infrared, and determine that our structure is capable of sustaining an accelerating gradient of 300 MV/m at 1550 nm. Finally, we discuss possibilities for manufacturing these structures using common microfabrication techniques

  3. The SPEAR3 Vacuum System - An Analysis of the First Two Years of Operation (2004 and 2005)

    International Nuclear Information System (INIS)

    Armenta, R.

    2005-01-01

    SPEAR 3, a synchrotron radiation source at the Stanford Linear Accelerator Center, has been in operation for the past two years. SPEAR 3 was designed to achieve high beam lifetimes while operating at a higher current level than previously achieved with SPEAR 2. Maintaining high electron beam lifetimes within the ring allows users to perform their experiments with a consistent supply of high current synchrotron radiation. The purpose of this analysis is to evaluate the SPEAR 3 vacuum system's performance during the 2004 and 2005 runs while considering methods to optimize and improve vacuum system conditioning, especially within the pumping system, so that a recommended plan of action can be created for the FY 2006 run. Monitoring the dynamics of the electron beam within the ring can be a difficult task. Pressure data obtained from the gages attached to pumps, temperature data obtained from thermocouples located at various locations around the ring, and beam lifetime projections help to provide some indication of the health of the electron beam, but the true conditions within the beam chamber can only be extrapolated. Data collected from sensors (gauges, thermocouples, etc.) located around the ring can be viewed and extracted from a program created at the Stanford Synchrotron Radiation Laboratory (SSRL) called Historyplot. Manipulation and analysis of data was performed with the commercially available programs Matlab and Excel. The data showed that the beam lifetimes in 2005 were much greater than they were in 2004, but it did not provide a clear indication as to why this occurred. One variable of major importance between the 2004 and 2005 runs is the Titanium Sublimation Pump (TSP) flash frequency (flashing is the process in which Titanium from filaments within the pump is sublimated onto the wall surfaces of the pump, where it removes gas molecules from the system by chemisorption). The data indicated that pressures in 2005 could have been lower, based on a

  4. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum-assisted blood collection system. 864.9125 Section 864.9125 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES HEMATOLOGY AND PATHOLOGY DEVICES Products Used In Establishments That Manufacture...

  5. Large vacuum system for experiences in magnetic confined plasmas

    International Nuclear Information System (INIS)

    Honda, R.Y.; Kayama, M.E.; Boeckelmann, H.K.; Aihara, S.

    1984-01-01

    It is presented the operation method of a theta-pinch system capable of generating and confine plasmas with high densities and temperatures. Some characteristics of Tupa theta-pinch, which is operating at UNICAMP, emphasizing the cleaning mode of the vacuum chamber, are also presented. (M.C.K.) [pt

  6. Space Suit Portable Life Support System (PLSS) 2.0 Unmanned Vacuum Environment Testing

    Science.gov (United States)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    For the first time in more than 30 years, an advanced space suit Portable Life Support System (PLSS) design was operated inside a vacuum chamber representative of the flight operating environment. The test article, PLSS 2.0, was the second system-level integrated prototype of the advanced PLSS design, following the PLSS 1.0 Breadboard that was developed and tested throughout 2011. Whereas PLSS 1.0 included five technology development components with the balance the system simulated using commercial-off-the-shelf items, PLSS 2.0 featured first generation or later prototypes for all components less instrumentation, tubing and fittings. Developed throughout 2012, PLSS 2.0 was the first attempt to package the system into a flight-like representative volume. PLSS 2.0 testing included an extensive functional evaluation known as Pre-Installation Acceptance (PIA) testing, Human-in-the-Loop testing in which the PLSS 2.0 prototype was integrated via umbilicals to a manned prototype space suit for 19 two-hour simulated EVAs, and unmanned vacuum environment testing. Unmanned vacuum environment testing took place from 1/9/15-7/9/15 with PLSS 2.0 located inside a vacuum chamber. Test sequences included performance mapping of several components, carbon dioxide removal evaluations at simulated intravehicular activity (IVA) conditions, a regulator pressure schedule assessment, and culminated with 25 simulated extravehicular activities (EVAs). During the unmanned vacuum environment test series, PLSS 2.0 accumulated 378 hours of integrated testing including 291 hours of operation in a vacuum environment and 199 hours of simulated EVA time. The PLSS prototype performed nominally throughout the test series, with two notable exceptions including a pump failure and a Spacesuit Water Membrane Evaporator (SWME) leak, for which post-test failure investigations were performed. In addition to generating an extensive database of PLSS 2.0 performance data, achievements included requirements and

  7. Micro-damage propagation in ultra-high vacuum seals

    CERN Document Server

    Lutkiewicz, P; Garion, C

    2010-01-01

    The paper addresses a fundamental problem of tightness of ultra-high vacuum systems (UHV) at cryogenic temperatures in the light of continuum damage mechanics (CDM). The problem of indentation of a rigid punch into an elastic-plastic half-space is investigated based on rate independent plasticity with mixed kinematic and isotropic hardening. The micro-damage fields are modeled by using an anisotropic approach with a kinetic law of damage evolution suitable for ductile materials and cryogenic temperatures. The model has been experimentally validated and the results are used to predict the onset of macro-cracking (loss of tightness) and the corresponding load (contact pressure). The algorithm is applied in the design of UHV systems for particle accelerators. (C) 2009 Published by Elsevier Ltd.

  8. Applications of vacuum technology to novel accelerator problems

    International Nuclear Information System (INIS)

    Garwin, E.L.

    1983-01-01

    Vacuum requirements for electron storage rings are most demanding to fulfill, due to the presence of gas desorption caused by large quantities of synchrotron radiation, the very limited area accessible for pumping ports, the need for 10 -9 torr pressures in the ring, and for pressures a decade lower in the interaction regions. Design features of a wide variety of distributed ion sublimation pumps (DIP) developed at SLAC to meet these requirements are discussed, as well as NEG (non-evaporable getter) pumps tested for use in the Large Electron Positron Collider at CERN. Application of DIP to much higher pressures in electron damping rings for the Stanford Linear Collider are discussed

  9. Statistics of vacuum breakdown in the high-gradient and low-rate regime

    Science.gov (United States)

    Wuensch, Walter; Degiovanni, Alberto; Calatroni, Sergio; Korsbäck, Anders; Djurabekova, Flyura; Rajamäki, Robin; Giner-Navarro, Jorge

    2017-01-01

    In an increasing number of high-gradient linear accelerator applications, accelerating structures must operate with both high surface electric fields and low breakdown rates. Understanding the statistical properties of breakdown occurrence in such a regime is of practical importance for optimizing accelerator conditioning and operation algorithms, as well as of interest for efforts to understand the physical processes which underlie the breakdown phenomenon. Experimental data of breakdown has been collected in two distinct high-gradient experimental set-ups: A prototype linear accelerating structure operated in the Compact Linear Collider Xbox 12 GHz test stands, and a parallel plate electrode system operated with pulsed DC in the kV range. Collected data is presented, analyzed and compared. The two systems show similar, distinctive, two-part distributions of number of pulses between breakdowns, with each part corresponding to a specific, constant event rate. The correlation between distance and number of pulses between breakdown indicates that the two parts of the distribution, and their corresponding event rates, represent independent primary and induced follow-up breakdowns. The similarity of results from pulsed DC to 12 GHz rf indicates a similar vacuum arc triggering mechanism over the range of conditions covered by the experiments.

  10. Proceedings of B Factories, the state of the art in accelerators, detectors and physics

    International Nuclear Information System (INIS)

    Hitlin, D.

    1992-11-01

    The conference B Factories, The State of the Art in Accelerators, Detectors and Physics was held at Stanford Linear Accelerator Center on April 6-10, 1992. The guiding principle of the conference was to bring together accelerator physicists and high energy experimentalists and theorists at the same time, with the goal of encouraging communication in defining and solving problems in a way which cut across narrow areas of specialization. Thus the conference was, in large measure, two distinct conferences, one involving accelerator specialists, the other theorists and experimentalists. There were initial and closing plenary sessions, and three separate tracks of parallel sessions, called Accelerator, Detector/Physics and Joint Interest sessions. This report contains the papers of this conference, the general topics of these cover: vacuum system, lattice design, beam-beam interactions, rf systems, feedback systems, measuring instrumentation, the interaction region, radiation background, particle detectors, particle tracking and identification, data acquisition, and computing system, and particle theory

  11. Proceedings of B Factories, the state of the art in accelerators, detectors and physics

    Energy Technology Data Exchange (ETDEWEB)

    Hitlin, D. (ed.) (California Inst. of Tech., Pasadena, CA (United States))

    1992-11-01

    The conference B Factories, The State of the Art in Accelerators, Detectors and Physics was held at Stanford Linear Accelerator Center on April 6-10, 1992. The guiding principle of the conference was to bring together accelerator physicists and high energy experimentalists and theorists at the same time, with the goal of encouraging communication in defining and solving problems in a way which cut across narrow areas of specialization. Thus the conference was, in large measure, two distinct conferences, one involving accelerator specialists, the other theorists and experimentalists. There were initial and closing plenary sessions, and three separate tracks of parallel sessions, called Accelerator, Detector/Physics and Joint Interest sessions. This report contains the papers of this conference, the general topics of these cover: vacuum system, lattice design, beam-beam interactions, rf systems, feedback systems, measuring instrumentation, the interaction region, radiation background, particle detectors, particle tracking and identification, data acquisition, and computing system, and particle theory.

  12. LLNL Tandem Mirror Experiment (TMX) upgrade vacuum system

    International Nuclear Information System (INIS)

    Pickles, W.L.; Chargin, A.K.; Drake, R.P.

    1981-01-01

    TMX Upgrade is a large, tandem, magnetic-mirror fusion experiment with stringent requirements on base pressure (10 -8 torr), low H reflux from the first walls, and peak gas pressure (5 x 10 -7 torr) due to neutral beam gas during plasma operation. The 225 m 3 vacuum vessel is initially evacuated by turbopumps. Cryopumps provide a continuous sink for gases other than helium, deuterium, and hydrogen. The neutral beam system introduces up to 480 l/s of H or D. The hydrogen isotopes are pumped at very high speed by titanium sublimed onto two cylindrical radially separated stainless steel quilted liners with a total surface area of 540 m 2 . These surfaces (when cooled to about 80 0 K) provide a pumping speed of 6 x 10 7 l/s for hydrogen. The titanium getter system is programmable and is used for heating as well as gettering. The inner plasma liner can be operated at elevated temperatures to enhance migration of gases away from the surfaces close to the plasma. Glow discharge cleaning is part of the pumpdown procedure. The design features are discussed in conjunction with the operating procedures developed to manage the dynamic vacuum conditions

  13. Vacuum status-display and sector-conditioning programs

    International Nuclear Information System (INIS)

    Skelly, J.; Yen, S.

    1989-01-01

    Two programs have been developed for observation and control of the AGS vacuum system, which include these notable features: they incorporate a graphical user interface, and they are driven by a relational database which describes the vacuum system. The vacuum system comprises some 440 devices organized into 28 vacuum sectors. The Status Display Program invites menu selection of a sector, interrogates the relational database for relevant vacuum devices, acquires live readbacks, and posts a graphical display of their status. The Sector Conditioning Program likewise invites sector selection, produces the same status display, and also implements process control logic on the sector devices to pump the sector down from atmospheric pressure to high vacuum over a period extending for several hours. As additional devices are installed in the vacuum system, the devices are likewise added to the relational database; these programs then automatically include the new devices. 2 refs., 1 fig

  14. Continuous fed-batch vacuum fermentation system for glycerol from molasses by the sulfite process

    Energy Technology Data Exchange (ETDEWEB)

    Kalle, G.P.; Naik, S.C.

    1985-01-01

    A continuous fed-batch vacuum fermentation system has been described for the production of glycerol from cane molasses (and juice) by a conventional sulfite process. A glycerol concentration of 80 g/l was achieved with a productivity of 30 g/l/day at a dilution rate of 0.4/day which is twice that from a vacuum batch process (15 g/l/day) or four times that obtained without vacuum (8 g/l/day). 8 references.

  15. HIGH PRODUCTIVITY VACUUM BLASTING SYSTEM

    International Nuclear Information System (INIS)

    McPhee, William S.

    2001-01-01

    The Department of Energy (DOE) needs improved technologies to decontaminate large areas of both concrete and steel surfaces. The technology should have high operational efficiency, minimize exposures to workers, and produce low levels of secondary waste. In order to meet the DOE's needs, an applied research and development project for the improvement of a current decontamination technology, Vacuum Blasting, is proposed. The objective of this project is to improve the productivity and lower the expense of the existing vacuum blasting technology which has been widely used in DOE sites for removing radioactive contamination, PCBs, and lead-based paint. The proposed work would increase the productivity rate and provide safe and cost-effective decontamination of the DOE sites

  16. Quantum fluctuations in the dressed vacuum of a bosonic model system

    International Nuclear Information System (INIS)

    Wagner, R E; Su, Q; Grobe, R; Acosta, S; Glasgow, S A

    2012-01-01

    Quantum fluctuations and the polarizability of the vacuum state are sometimes interpreted in terms of virtual particles that come into and out of existence for a limited amount of time. We study the spatial and temporal properties of these auxiliary particles on a numerical space-time grid for a one-dimensional model system. This approach permits us to compute the average distance between virtual particles and their lifetime. The creation dynamics of the virtual particles from the bare vacuum state is also examined. (paper)

  17. Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume V. Vacuum-pumping system. Preliminary design report

    International Nuclear Information System (INIS)

    1982-01-01

    This report summarizes Title I Preliminary Design of the EBT-P Vacuum Pumping System. The Vacuum Pumping System has been designed by the McDonnell Douglas Astronautics Co. - St. Louis (MDAC). It includes the necessary vacuum pumps and vacuum valves to evacuate the torus, the Mirror Coil Dewars (MC Dewars), and the Gyrotron Magnet Dewars. The pumping ducts, manifolds, and microwave protection system are also included. A summary of the function of each subsystem and a description of its principle components is provided below. The analyses performed during the system design are also identified

  18. Evaluation of a Prototype Hybrid Vacuum Pump to Provide Vacuum-Assisted Suspension for Above-Knee Prostheses.

    Science.gov (United States)

    Major, Matthew J; Caldwell, Ryan; Fatone, Stefania

    2015-12-01

    Vacuum-assisted suspension (VAS) of prosthetic sockets utilizes a pump to evacuate air from between the prosthetic liner and socket, and are available as mechanical or electric systems. This technical note describes a hybrid pump that benefits from the advantages of mechanical and electric systems, and evaluates a prototype as proof-of-concept. Cyclical bench testing of the hybrid pump mechanical system was performed using a materials testing system to assess the relationship between compression cycles and vacuum pressure. Phase 1 in vivo testing of the hybrid pump was performed by an able-bodied individual using prosthesis simulator boots walking on a treadmill, and phase 2 involved an above-knee prosthesis user walking with the hybrid pump and a commercial electric pump for comparison. Bench testing of 300 compression cycles produced a maximum vacuum of 24 in-Hg. In vivo testing demonstrated that the hybrid pump continued to pull vacuum during walking, and as opposed to the commercial electric pump, did not require reactivation of the electric system during phase 2 testing. The novelty of the hybrid pump is that while the electric system provides rapid, initial vacuum suspension, the mechanical system provides continuous air evacuation while walking to maintain suspension without reactivation of the electric system, thereby allowing battery power to be reserved for monitoring vacuum levels.

  19. Paraformaldehyde pellet not necessary in vacuum-pumped maple sap system

    Science.gov (United States)

    H. Clay Smith; Carter B. Gibbs

    1970-01-01

    In a study of sugar maple sap collection through a vacuum-pumped plastic tubing system, yields were compared between tapholes in which paraformaldehyde pellets were used and tapholes without pellets, Use of the pellets did not increase yield.

  20. The charge state distribution of Be, C, Cl and Al ions at the Lund Pelletron accelerator with the recently modified terminal pumping in use

    International Nuclear Information System (INIS)

    Kiisk, Madis; Hellborg, Ragnar; Persson, Per; Faarinen, Mikko; Skog, Goeran; Stenstroem, Kristina

    2004-01-01

    Some years ago terminal pumping for the gas stripper system at the 3 MV Lund Tandem Pelletron accelerator was installed and charge state distribution measurements using the new installation were reported. Since then, new modifications of the mechanical design of the stripper system have been made. The results of pressure profile measurements as well as the results of charge state distribution measurements in a N 2 and Ar gas stripper at different, new geometrical modifications of the stripper system using C, Be, Al and Cl ion beams are reported. A comparison between pressure profiles obtained for different geometries shows a clear improvement of the vacuum conditions outside the stripper housing for the smallest conductance pipes between the stripper system and the accelerator tubes. These improvements are also well reflected in the charge state distribution measurements, as a higher mean charge state is obtained under the same vacuum conditions in the accelerator tubes for the improved stripper system in comparison with the former mechanical design

  1. Nonperturbative Dynamical Casimir Effect in Optomechanical Systems: Vacuum Casimir-Rabi Splittings

    Directory of Open Access Journals (Sweden)

    Vincenzo Macrì

    2018-02-01

    Full Text Available We study the dynamical Casimir effect using a fully quantum-mechanical description of both the cavity field and the oscillating mirror. We do not linearize the dynamics, nor do we adopt any parametric or perturbative approximation. By numerically diagonalizing the full optomechanical Hamiltonian, we show that the resonant generation of photons from the vacuum is determined by a ladder of mirror-field vacuum Rabi splittings. We find that vacuum emission can originate from the free evolution of an initial pure mechanical excited state, in analogy with the spontaneous emission from excited atoms. By considering a coherent drive of the mirror, using a master-equation approach to take losses into account, we are able to study the dynamical Casimir effect for optomechanical coupling strengths ranging from weak to ultrastrong. We find that a resonant production of photons out of the vacuum can be observed even for mechanical frequencies lower than the cavity-mode frequency. Since high mechanical frequencies, which are hard to achieve experimentally, were thought to be imperative for realizing the dynamical Casimir effect, this result removes one of the major obstacles for the observation of this long-sought effect. We also find that the dynamical Casimir effect can create entanglement between the oscillating mirror and the radiation produced by its motion in the vacuum field, and that vacuum Casimir-Rabi oscillations can occur. Finally, we also show that all these findings apply not only to optomechanical systems, but also to parametric amplifiers operating in the fully quantum regime.

  2. VUV photoemission studies of candidate Large Hadron Collider vacuum chamber materials

    Directory of Open Access Journals (Sweden)

    R. Cimino

    1999-06-01

    Full Text Available In the context of future accelerators and, in particular, the beam vacuum of the Large Hadron Collider (LHC, a 27 km circumference proton collider to be built at CERN, VUV synchrotron radiation (SR has been used to study both qualitatively and quantitatively candidate vacuum chamber materials. Emphasis is given to show that angle and energy resolved photoemission is an extremely powerful tool to address important issues relevant to the LHC, such as the emission of electrons that contributes to the creation of an electron cloud which may cause serious beam instabilities and unmanageable heat loads on the cryogenic system. Here we present not only the measured photoelectron yields from the proposed materials, prepared on an industrial scale, but also the energy and in some cases the angular dependence of the emitted electrons when excited with either a white light (WL spectrum, simulating that in the arcs of the LHC, or monochromatic light in the photon energy range of interest. The effects on the materials examined of WL irradiation and /or ion sputtering, simulating the SR and ion bombardment expected in the LHC, were investigated. The studied samples exhibited significant modifications, in terms of electron emission, when exposed to the WL spectrum from the BESSY Toroidal Grating Monochromator beam line. Moreover, annealing and ion bombardment also induce substantial changes to the surface thereby indicating that such surfaces would not have a constant electron emission during machine operation. Such characteristics may be an important issue to define the surface properties of the LHC vacuum chamber material and are presented in detail for the various samples analyzed. It should be noted that all the measurements presented here were recorded at room temperature, whereas the majority of the LHC vacuum system will be maintained at temperatures below 20 K. The results cannot therefore be directly applied to these sections of the machine until

  3. Interaction of a relativistic charge with vacuum channel elements

    International Nuclear Information System (INIS)

    Tatarnikov, V.A.

    1989-01-01

    The problems of beam acceleration and transport require accounting for the effects connected with natural fields of charged particles. Flying along the accelerating structure elements the bunch induces charges and currents on the walls which, in their turn, affect the accelerating particles creating a secondary electromagnetic field. The effect of vacuum channel walls on the charged particle energy is considered. In the approximation of an assigned current the expressions for integral changes in the energy of relativistic charge, are obtained. The difference in the nature of charge interaction with the inhomogeneities of the diaphragm type and a semiinfinite waveguide, is shown

  4. 46 CFR 154.804 - Vacuum protection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Vacuum protection. 154.804 Section 154.804 Shipping... Systems § 154.804 Vacuum protection. (a) Except as allowed under paragraph (b) of this section, each cargo tank must have a vacuum protection system meeting paragraph (a)(1) of this section and either paragraph...

  5. Vacuum type D initial data

    Science.gov (United States)

    García-Parrado Gómez-Lobo, Alfonso

    2016-09-01

    A vacuum type D initial data set is a vacuum initial data set of the Einstein field equations whose data development contains a region where the space–time is of Petrov type D. In this paper we give a systematic characterisation of a vacuum type D initial data set. By systematic we mean that the only quantities involved are those appearing in the vacuum constraints, namely the first fundamental form (Riemannian metric) and the second fundamental form. Our characterisation is a set of conditions consisting of the vacuum constraints and some additional differential equations for the first and second fundamental forms These conditions can be regarded as a system of partial differential equations on a Riemannian manifold and the solutions of the system contain all possible regular vacuum type D initial data sets. As an application we particularise our conditions for the case of vacuum data whose data development is a subset of the Kerr solution. This has applications in the formulation of the nonlinear stability problem of the Kerr black hole.

  6. Survey of electronic safety systems in accelerator applications

    International Nuclear Information System (INIS)

    Mahoney, K.

    1997-01-01

    This paper presents the preliminary results and analysis of a comprehensive survey of the implementation of accelerator safety interlock systems from over 30 international labs. At the present time there is not a self consistent means to evaluate both the experiences and level of protection provided by electronic safety interlock systems. This research is intended to analyze the strength and weaknesses of several different types of interlock system implementation methodologies. Research, medical, and industrial accelerators are compared. Thomas Jefferson National Accelerator Facility (TJNAF) was one of the first large particle accelerators to implement a safety interlock system using programmable logic controllers. Since that time all of the major new U.S. accelerator construction projects plan to use some form of programmable electronics as part of a safety interlock system in some capacity

  7. Cryogenic Beam Screens for High-Energy Particle Accelerators

    CERN Document Server

    Baglin, V; Tavian, L; van Weelderen, R

    2013-01-01

    Applied superconductivity has become a key enabling technology for high-energy particle accelerators, thus making them large helium cryogenic systems operating at very low temperature. The circulation of high-intensity particle beams in these machines generates energy deposition in the first wall through different processes. For thermodynamic efficiency, it is advisable to intercept these beam-induced heat loads, which may be large in comparison with cryostat heat in-leaks, at higher temperature than that of the superconducting magnets of the accelerator, by means of beam screens located in the magnet apertures. Beam screens may also be used as part of the ultra-high vacuum system of the accelerator, by sheltering the gas molecules cryopumped on the beam pipe from impinging radiation and thus avoiding pressure runaway. Space being extremely tight in the magnet apertures, cooling of the long, slender beam screens also raises substantial problems in cryogenic heat transfer and fluid flow. We present sizing rule...

  8. Automatic gas-levitation system for vacuum deposition of laser-fusion targets

    International Nuclear Information System (INIS)

    Jordan, C.W.; Cameron, G.R.; Krenik, R.M.; Crane, J.K.

    1981-01-01

    An improved simple system has been developed to gas-levitate microspheres during vacuum-deposition processes. The automatic operation relies on two effects: a lateral stabilizing force provided by a centering-ring; and an automatically incremented gas metering system to offset weight increases during coating

  9. A study of some features of the ultra high vacuum systems for EPIC

    International Nuclear Information System (INIS)

    Elsey, R.J.; Bennett, J.R.J.; Dossett, A.J.

    1977-01-01

    This report covers the experimental work carried out towards the development of the ultra high vacuum for the proposed electron positron storage ring, EPIC. Experiments included outgassing tests on samples of materials and pump-down tests on full scale aluminium vessels. The effect of baking was investigated. The approval of the similar machine PETRA at Hamburg and the subsequent withdrawal of the EPIC proposal in October 1975 curtailed the vacuum work. The experiments reported here are therefore incomplete, but nevertheless proved useful in showing that there should have been no major problems with building the vacuum system for EPIC. (author)

  10. Validated design of the ITER main vacuum pumping systems

    International Nuclear Information System (INIS)

    Day, Chr.; Antipenkov, A.; Dremel, M.; Haas, H.; Hauer, V.; Mack, A.; Boissin, J.-C.; Class, G.; Murdoch, D.K.; Wykes, M.

    2005-01-01

    Forschungszentrum Karlsruhe is developing the ITER high vacuum cryogenic pumping systems (torus, cryostat, NBI) as well as the corresponding mechanical roughing pump trains. All force-cooled big cryopumps incorporate similar design of charcoal coated cryopanels cooled to 5 K with supercritical helium. A model of the torus exhaust cryopump was comprehensively characterised in the TIMO testbed at Forschungszentrum. This paper discusses the vacuum performance results of the model pump and outlines how these data were incorporated in a sound design of the whole ITER torus exhaust pumping system. To do this, the dedicated software package ITERVAC was developed which is able to describe gas flow in viscous, transitional and molecular flow regimes as needed for the gas coming through the divertor slots and along the pump ducts into the cryopumps. The entrance section between the divertor cassettes and each pumping duct was identified to be the bottleneck of the gas flow. The interrelation of achievable throughputs as a function of the divertor pressure and the cryopump pumping speed is discussed. The system design is completed by assessment of the NBI cryopump system and integrating performance curves for the roughing pump trains needed during the regeneration phases of the cryopumps. (author)

  11. Application of local area networks to accelerator control systems at the Stanford Linear Accelerator

    International Nuclear Information System (INIS)

    Fox, J.D.; Linstadt, E.; Melen, R.

    1983-03-01

    The history and current status of SLAC's SDLC networks for distributed accelerator control systems are discussed. These local area networks have been used for instrumentation and control of the linear accelerator. Network topologies, protocols, physical links, and logical interconnections are discussed for specific applications in distributed data acquisition and control system, computer networks and accelerator operations

  12. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Foerster, C.L.

    1995-01-01

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and recently a fully conditioned machine vacuum at design currents was obtained. A brief description of the x-ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. 15 refs., 2 tabs., 8 figs

  13. Longitudinal coupling impedance of a double-step cross section change in the vacuum chamber

    International Nuclear Information System (INIS)

    Guidee, P.; Hahn, H.; Mizumachi, Y.

    1978-03-01

    The coupling impedance of a double-step cross section change in the vacuum chamber of an accelerator or storage ring is computed in first approximation. The character of the coupling impedance in the various frequency domains, that is low-frequency, above cut-off frequency of the vacuum chamber, and at resonances is discussed

  14. A transparent vacuum window for high-intensity pulsed beams

    CERN Document Server

    Monteil, M; Veness, R

    2011-01-01

    The HiRadMat (High-Radiation to Materials) facility Ill will allow testing of accelerator components, in particular those of the Large Hadron Collider (LHC) at CERN, under the impact of high-intensity pulsed beams. To reach this intensity range, the beam will be focused on a focal point where the target to be tested is located. A 60 mm aperture vacuum window will separate the vacuum of the beam line which is kept under high vacuum 10(-8) mbar, from the test area which is at atmospheric pressure. This window has to resist collapse due to beam passage. The high-intensity of the beam means that typical materials used for standard vacuum windows (such as stainless steel, aluminium and titanium alloy) cannot endure the energy deposition induced by the beam passage. Therefore, a vacuum window has been designed to maintain the differential pressure whilst resisting collapse due to the beam impact on the window. In this paper, we will present calculations of the energy transfer from beam to window, the design of the ...

  15. Ground test accelerator control system software

    International Nuclear Information System (INIS)

    Burczyk, L.; Dalesio, R.; Dingler, R.; Hill, J.; Howell, J.A.; Kerstiens, D.; King, R.; Kozubal, A.; Little, C.; Martz, V.; Rothrock, R.; Sutton, J.

    1988-01-01

    This paper reports on the GTA control system that provides an environment in which the automation of a state-of-the-art accelerator can be developed. It makes use of commercially available computers, workstations, computer networks, industrial 110 equipment, and software. This system has built-in supervisory control (like most accelerator control systems), tools to support continuous control (like the process control industry), and sequential control for automatic start-up and fault recovery (like few other accelerator control systems). Several software tools support these levels of control: a real-time operating system (VxWorks) with a real-time kernel (VRTX), a configuration database, a sequencer, and a graphics editor. VxWorks supports multitasking, fast context-switching, and preemptive scheduling. VxWorks/VRTX is a network-based development environment specifically designed to work in partnership with the UNIX operating system. A data base provides the interface to the accelerator components. It consists of a run time library and a database configuration and editing tool. A sequencer initiates and controls the operation of all sequence programs (expressed as state programs). A graphics editor gives the user the ability to create color graphic displays showing the state of the machine in either text or graphics form

  16. National Synchrotron Light Source: vacuum system for National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Schuchman, J.C.; Godel, J.B.; Jordan, W.; Oversluizen, T.

    1978-01-01

    The National Synchrotron Light Source (NSLS), a 24 million dollar project under construction at Brookhaven National Laboratory (BNL), is a research facility dedicated to the production of synchrotron radiation. Synchrotron radiation is that radiation produced by the acceleration of charged particles at near the speed of light. This facility will provide a continuous spectrum of radiation from the vacuum ultraviolet to the hard x-ray range. The radiation will be highly intense, 100% polarized, extremely well collimated and will have a pulsed time structure. The radiation will be produced in two electron storage rings at energies of 700 MeV and 2.5 GeV, respectively. A maximum of one ampere at 2 GeV, or one-half ampere at 2.5 GeV, of electron beam will be stored

  17. Waveguide transition with vacuum window for multiband dynamic nuclear polarization systems

    Energy Technology Data Exchange (ETDEWEB)

    Rybalko, Oleksandr; Bowen, Sean; Zhurbenko, Vitaliy [Technical University of Denmark, Ørsteds Plads 349, 2800 Kgs. Lyngby (Denmark); Ardenkjær-Larsen, Jan Henrik, E-mail: jhar@elektro.dtu.dk [Technical University of Denmark, Ørsteds Plads 349, 2800 Kgs. Lyngby (Denmark); GE Healthcare, Park Alle 295, Brøndby (Denmark)

    2016-05-15

    A low loss waveguide transition section and oversized microwave vacuum window covering several frequency bands (94 GHz, 140 GHz, 188 GHz) is presented. The transition is compact and was optimized for multiband Dynamic Nuclear Polarization (DNP) systems in a full-wave simulator. The window is more broadband than commercially available windows, which are usually optimized for single band operation. It is demonstrated that high-density polyethylene with urethane adhesive can be used as a low loss microwave vacuum window in multiband DNP systems. The overall assembly performance and dimensions are found using full-wave simulations. The practical aspects of the window implementation in the waveguide are discussed. To verify the design and simulation results, the window is tested experimentally at the three frequencies of interest.

  18. Applications of vacuum technology to novel accelerator problems

    Energy Technology Data Exchange (ETDEWEB)

    Garwin, E.L.

    1983-01-01

    Vacuum requirements for electron storage rings are most demanding to fulfill, due to the presence of gas desorption caused by large quantities of synchrotron radiation, the very limited area accessible for pumping ports, the need for 10/sup -9/ torr pressures in the ring, and for pressures a decade lower in the interaction regions. Design features of a wide variety of distributed ion sublimation pumps (DIP) developed at SLAC to meet these requirements are discussed, as well as NEG (non-evaporable getter) pumps tested for use in the Large Electron Positron Collider at CERN. Application of DIP to much higher pressures in electron damping rings for the Stanford Linear Collider are discussed.

  19. Vacuum system design and tritium inventory for the charge exchange diagnostic on the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Medley, S.S.

    1986-01-01

    The application of charge exchange analyzers for the measurement of ion temperature in fusion plasma experiments requires a direct connection between the diagnostic and plasma-discharge vacuum chambers. Differential pumping of the gas load from the diagnostic stripping cell operated at > or approx. = 10 -3 Torr is required to maintain the analyzer chamber at a pressure of -6 Torr. The migration of gases between the diagnostic and plasma vacuum chambers must be minimized. In particular, introduction of the analyzer stripping cell gas into the plasma chamber having a base pressure of -8 Torr must be suppressed. The charge exchange diagnostic for the Tokamak Fusion Test Reactor (TFTR) is comprised of two analyzer systems designed to contain a total of 18 independent mass/energy analyzers and one diagnostic neutral beam rated at 80 keV, 15 A. The associated arrays of multiple, interconnected vacuum systems were analyzed using the Vacuum System Transient Simulator (Vsts) computer program which models the transient transport of multigas species through complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. In addition to providing improved design performance at reduced costs, the analysis yields estimates for the exchange of tritium from the torus to the diagnostic components and of the diagnostic working gases to the torus

  20. Application of vacuum membrane distillation to lithium bromide absorption refrigeration system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Zanshe; Feng, Shiyu; Li, Yun [School of Energy and Power Engineering, Xi' an Jiaotong University, Xi' an 710049 (China); Gu, Zhaolin [School of Human Settlement and Civil Engineering, Xi' an Jiaotong University, Xi' an 710049 (China)

    2009-11-15

    Conventional generator in lithium bromide absorption refrigeration system is too bulky and heavy to be fitted into small scale device, and the temperature of the driving heater in the generator seems much higher than low grade energy such as regenerative energy or waste heat energy. In this paper, desorption of aqueous lithium bromide solution by vacuum membrane distillation process was presented. Hollow fiber membrane module made by polyvinylidene fluoride was used as desorption device of aqueous lithium bromide solution. Influencing factors of feed flux, feed temperature in lumen side and vacuum pressure in shell side were tested and analyzed with orthogonal test. The results showed that permeation flux of water vapor increased with the feed temperature increasing and the feed flux increasing in lumen side, and the permeation flux also went up along with absolute pressure drop in shell side. Feasibility and potential application analysis shows that the temperature of the driving heat was low and the volume and weight of the desorption device was light. In this study, vacuum membrane distillation to the lithium bromide absorption refrigeration system has proved to be an efficient and cheap desorption mode. (author)

  1. SMILE a new version for the RADLAC II linear accelerator

    International Nuclear Information System (INIS)

    Mazarakis, M.G.; Poukey, J.W.; Shope, S.L.; Frost, C.A.; Pankuch, P.J.; Turman, B.N.; Ramirez, J.J.; Prestwich, K.R.

    1991-01-01

    The authors present here the SMILE modification of the RADLAC II accelerator which enabled them to produce high quality 12-14 MV, 100 kA beams. The modification of replacing the 40-kA 4-MV beam injector, magnetic vacuum transport and accelerating gaps by a long cathode shank which adds up the voltages of the 8 pulse forming lines. The beam now is produced at the end of the accelerator and is free of all the possible instabilities associated with accelerating gaps and magnetic vacuum transport. Annular beams with β perpendicular ≤ 0.1 and radius r b ≤ 2 cm are routinely obtained and extracted from a small magnetically immersed foilless electron diode. Results of the experimental evaluation are presented and compared with design parameters and numerical simulation predictions

  2. High vacuum portable pumping station suitable for accelerator use

    International Nuclear Information System (INIS)

    Stattel, P.; Briggs, J.; DeBoer, W.; Skelton, R.

    1985-01-01

    The need for a Portable Pump Station for Ultra High Vacuum use became apparent when the ''Isabelle'' collider was first being designed. A Portable Pump Station had to be developed which contained the following features: maneuverability, compact size, rugged, self protected against various failures, capable of running unattended, and capable of reaching 10 -9 torr. The Pump Station that was developed and other variations are the subject of this paper. Emphasis will be on the Isabelle and HITL versions. 1 ref., 2 figs., 1 tab

  3. Linear induction accelerator and pulse forming networks therefor

    Science.gov (United States)

    Buttram, Malcolm T.; Ginn, Jerry W.

    1989-01-01

    A linear induction accelerator includes a plurality of adder cavities arranged in a series and provided in a structure which is evacuated so that a vacuum inductance is provided between each adder cavity and the structure. An energy storage system for the adder cavities includes a pulsed current source and a respective plurality of bipolar converting networks connected thereto. The bipolar high-voltage, high-repetition-rate square pulse train sets and resets the cavities.

  4. The vacuum system for insertion devices at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Trakhtenberg, E.; Gluskin, E.; Den Hartog, P.; Klippert, T.; Wiemerslage, G.; Xu, S.

    1995-01-01

    A vacuum system for the insertion devices at the Advanced Photon Source was designed, and chambers of this design were successfully manufactured and tested. Three different versions of the vacuum chamber have been developed with vertical apertures of 12 mm, 8mm, and 5 mm, respectively. The chambers are fabricated by extruding 6063 aluminum alloy to form a tube with the desired internal shaped and machining the exterior to finish dimensions. The wall thickness of the completed chamber at the beam orbit position is 1 mm. The design utilizes a rigid strongback that limits deflection of the chamber under vacuum despite the thin wall. Chambers with lengths of 2.2m and 5.2 m have been fabricated. Pumping is accomplished by a combination of lumped and distributed non-evaporable getters and ion pumps. An ultimate pressure of 5.1· -11 torr was achieved with the 12-mm vertical aperture prototype. Alignment of the vacuum chamber on its support can be made with a precision of ± 25 μm in the vertical plane, which allows minimum insertion device pole gaps of 14.5 mm, 10.5 mm, and 7.5 mm

  5. Cold Vacuum Drying facility condensate collection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) condensate collection system (CCS). The function of the CCS is to collect cooling coil condensate from air-handling units in the CVDF and to isolate the condensate in collection tanks until the condensate is determined to be acceptable to drain to the effluent drain collection basin

  6. A Magnetorestrictive Tuning System for Particle Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Chiu-Ying Tai; Jordan Cormier; William Espinola; Zhixiu Han; Chad Joshi; Anil Mavanur; Livia Racz; Kenneth Shepard; Edward Daly; Kirk Davis

    2005-05-16

    Energen, Inc. has designed, built, and demonstrated several fast and slow tuners based on its magnetostrictive actuators and stepper motor. These tuners are designed for Superconducting Radio Frequency (SRF) cavities, which are important structures in particle accelerators that support a wide spectrum of disciplines, including nuclear and high-energy physics and free electron lasers (FEL). In the past two years, Energen's work has focused on magnetostrictive fast tuners for microphonics and Lorentz detuning compensation on elliptical-cell and spoke-loaded cavities. These tuners were custom designed to meet specific requirements, which included a few to 100 micron stroke range, hundreds to kilohertz operation frequency, and cryogenic temperature operation in vacuum or liquid helium. These tuners have been tested in house and at different laboratories, such as DESY, Argonne National Lab, and Jefferson Lab. Some recent results are presented in this paper.

  7. Summary of Working Group 7 on 'Exotic acceleration schemes'

    International Nuclear Information System (INIS)

    Tajima, T.

    2001-01-01

    Exotic concepts of advanced acceleration technologies have been explored by Group 7 under the leadership of T. Tajima and T. Smith (who could not attend) at the AAC. Explored concepts are: (1) proton (ion) acceleration by laser, (2) additional ion acceleration methods, (3) crystal x-rays and acceleration, (4) vacuum acceleration, (5) active medium acceleration, and (6) some advanced methods in laser wakefield. The first subject of laser photon acceleration was discussed jointly with Group 1 and in the end the participants came to an agreement on the mechanism of proton acceleration by laser irradiation

  8. Optical signatures of discharges in parallel coupled DC accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Rajan, Rehim N.; Banerjee, Srutarshi; Acharya, S.N., E-mail: rehim@barc.gov.in [Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Mumbai (India); and others

    2014-07-01

    Parallel coupled voltage multiplier based accelerator topologies offer advantages of better regulation and ripple compared to their series coupled counterparts for Industrial electron beam accelerators. During conditioning and operation these systems undergoes various types of electrical discharges. The discharge can be a direct spark over from the high voltage terminal to ground through SF{sub 6} insulation, vacuum breakdown in the accelerating tube maintained in the order of 10{sup -7} mbar pressure, or local discharge between corona guards which are used to couple RF power to the multiplier. There could be discharges in between dynodes of the accelerating tube. As the inter electrode discharges do not reflect in load current, detection of these conditions becomes very difficult. Optical discharge detection methods can be used effectively in this situation. Photo multiplier based optical discharge detection has been deployed in a 3 MeV DC accelerator. Characteristics of the optical signal received during conditioning phase have been presented in this paper. (author)

  9. Expert system for accelerator single-freedom nonlinear components

    International Nuclear Information System (INIS)

    Wang Sheng; Xie Xi; Liu Chunliang

    1995-01-01

    An expert system by Arity Prolog is developed for accelerator single-freedom nonlinear components. It automatically yields any order approximate analytical solutions for various accelerator single-freedom nonlinear components. As an example, the eighth order approximate analytical solution is derived by this expert system for a general accelerator single-freedom nonlinear component, showing that the design of the expert system is successful

  10. Pierce electrodes for a multigap accelerating system

    International Nuclear Information System (INIS)

    Davydenko, V.I.; Ivanov, A.A.; Kotelnikov, I.A.; Tiunov, M.A.

    2007-01-01

    A well-known Pierce's solution that allows to focus a beam of charged particles using properly shaped electrodes outside the beam is generalized to the case of multigap accelerating system. Simple parametric formulae for Pierce electrodes are derived for an accelerating system with current density, limited either by space charge or by emitting property of the cathode. As an example of general approach, Pierce electrodes shape is analyzed for a system with two accelerating gaps. It is shown that precise Pierce's solution exists if acceleration rate within second gap is lower than within first gap. In the opposite case quasi-Pierce solution can be implemented using non-equipotential electrode between the gaps, and guidelines, based on numerical simulations, for the design of equipotential focusing electrodes are given

  11. Improving the Bevatron vacuum to 10-10 torr

    International Nuclear Information System (INIS)

    Avery, R.; Elioff, T.; Grunder, H.

    1981-03-01

    Pressure of approx. 10 -10 torr is needed in the Bevatron to accelerate partially-stripped very-heavy ions (e.g. U 69+ ) in the Bevatron without significant loss due to interactions with the residual gas. This ultra-high vacuum will be achieved by installing (summer and fall 1981) a cryogenic liner, mostly 12 0 K, surrounding the Bevatron circulating beam. The novel construction features are presented along with results from successful tests of prototype sections. This is believed to be the largest application of cryogenic pumping to particle accelerators yet undertaken

  12. A protection system for picosecond accelerator

    International Nuclear Information System (INIS)

    Cao Hongping; Chinese Academy of Sciences, Beijing; Chen Huanguang; Xu Ruinian; Tang Junlong; Li Deming

    2006-01-01

    A personnel and machine protection system for the picosecond accelerator has been built. The key of the system is to send on/off of three triggering signals which are those of electron gun, 2856 MHz and 476 MHz, respectively, to ensure the safety of users and the accelerator. This paper describes the emergencies interlocked by ADAM5511 and timing trigger processor, and some secondary functions which improve the efficiency of the protection system completed in upper layer software. (authors)

  13. Electron beam sub-harmonics chopping system for linear accelerator injector

    International Nuclear Information System (INIS)

    Bourat, Christophe

    1988-01-01

    The need of a 100 % duty cycle electron accelerator for use in nuclear physics, has led in 1981 the CEN Saclay Linear Accelerator Group, to study a machine using the existing linac associated with a pulse stretcher ring. The production of electron bunches at the ring RF frequency (600 MHz) requires the design of a new injector including a chopping beam System with a deflecting electromagnetic cavity and a collimator. A comparison between four transverse magnetic modes, led to choose a TM110 parallelepiped chopper. The construction of a prototype and of a vacuum-tight cavity followed by microwave measurements has permitted to solve several mechanical problems and to specify the cavity electrical properties. In a first step, the beam line, including - focusing, offset deflection coils, chopping with a rectangular collimator - has been studied, for zero intensity beam current, on the basis of a matrix model. An experimental 40 keV beam line, has been assembled to measure the bunch length. The method was based on a spectral analysis of the signal delivered by a large band, 50 ohms adapted beam collector. The bunch shape in the time domain was reconstructed by inverse Fourier transform. The beam dynamics has been studied with a 3D space charge model which has been introduced into the PARMELA tracking code. Simulations showed that a 150 keV, 2 A beam could be chopped with the same deflecting lay-out. (author) [fr

  14. Ion extraction capabilities of two-grid accelerator systems

    International Nuclear Information System (INIS)

    Rovang, D.C.; Wilbur, P.J.

    1984-02-01

    An experimental investigation into the ion extraction capabilities of two-grid accelerator systems common to electrostatic ion thrusters is described. This work resulted in a large body of experimental data which facilitates the selection of the accelerator system geometries and operating parameters necessary to maximize the extracted ion current. Results suggest that the impingement-limited perveance is not dramatically affected by reductions in screen hole diameter to 0.5 mm. Impingement-limited performance is shown to depend most strongly on grid separation distance, accelerator hole diameter ratio, the discharge-to-total accelerating voltage ratio, and the net-to-total accelerating voltage ratio. Results obtained at small grid separation ratios suggest a new grid operating condition where high beam current per hole levels are achieved at a specified net accelerating voltage. It is shown that this operating condition is realized at an optimum ratio of net-to-total accelerating voltage ratio which is typically quite high. The apparatus developed for this study is also shown to be well suited measuring the electron backstreaming and electrical breakdown characteristics of two-grid accelerator systems

  15. Remote vacuum or pressure sealing device and method for critical isolated systems

    Science.gov (United States)

    Brock, James David [Newport News, VA; Keith, Christopher D [Newport News, VA

    2012-07-10

    A remote vacuum or pressure sealing apparatus and method for making a radiation tolerant, remotely prepared seal that maintains a vacuum or pressure tight seal throughout a wide temperature range. The remote sealing apparatus includes a fixed threaded sealing surface on an isolated system, a gasket, and an insert consisting of a plug with a protruding sample holder. An insert coupling device, provided for inserting samples within the isolated system, includes a threaded fastener for cooperating with the fixed threaded sealing surface on the isolated system. The insert coupling device includes a locating pin for azimuthal orientation, coupling pins, a tooted coaxial socket wrench, and an insert coupling actuator for actuating the coupling pins. The remote aspect of the sealing apparatus maintains the isolation of the system from the user's environment, safely preserving the user and the system from detrimental effect from each respectively.

  16. Acceleration of a compact torus

    International Nuclear Information System (INIS)

    Hartmann, C.W.; Eddleman, J.L.; Hammer, J.H.; Kusse, B.

    1987-01-01

    The authors report the first results of a study of acceleration of spheromak-type compact toruses in the RACE experiment (plasma Ring ACceleration Experiment). The RACE apparatus consists of (1) a magnetized, coaxial plasma gun 50 cm long, 35 cm OD, 20 cm ID, (2) 600 cm long coaxial acceleration electrodes 50 cm OD, 20 cm ID, (3) a 250 kJ electrolytic capacitor bank to drive the gun solenoid for initial magnetization, (4) a 200 kJ gun bank, (5) a 260 kJ accelerator bank, and (6) magnetic probes and other diagnostics, and vacuum apparatus. To outer acceleration electrode is an extension, at larger OD, of the gun outer electrode, and the inner acceleration electrode is supported and fed by a coaxial insert in the gun center electrode as shown

  17. Vacuum pumping for controlled thermonuclear reactors

    International Nuclear Information System (INIS)

    Watson, J.S.; Fisher, P.W.

    1976-01-01

    Thermonuclear reactors impose unique vacuum pumping problems involving very high pumping speeds, handling of hazardous materials (tritium), extreme cleanliness requirements, and quantitative recovery of pumped materials. Two principal pumping systems are required for a fusion reactor, a main vacuum system for evacuating the torus and a vacuum system for removing unaccelerated deuterium from neutral beam injectors. The first system must pump hydrogen isotopes and helium while the neutral beam system can operate by pumping only hydrogen isotopes (perhaps only deuterium). The most promising pumping techniques for both systems appear to be cryopumps, but different cryopumping techniques can be considered for each system. The main vacuum system will have to include cryosorption pumps cooled to 4.2 0 K to pump helium, but the unburned deuterium-tritium and other impurities could be pumped with cryocondensation panels (4.2 0 K) or cryosorption panels at higher temperatures. Since pumping speeds will be limited by conductance through the ducts and thermal shields, the pumping performance for both systems will be similar, and other factors such as refrigeration costs are likely to determine the choice. The vacuum pumping system for neutral beam injectors probably will not need to pump helium, and either condensation or higher temperature sorption pumps can be used

  18. Classical mechanics and electromagnetism in accelerator physics

    CERN Document Server

    Stupakov, Gennady

    2018-01-01

    This self-contained textbook with exercises discusses a broad range of selected topics from classical mechanics and electromagnetic theory that inform key issues related to modern accelerators. Part I presents fundamentals of the Lagrangian and Hamiltonian formalism for mechanical systems, canonical transformations, action-angle variables, and then linear and nonlinear oscillators. The Hamiltonian for a circular accelerator is used to evaluate the equations of motion, the action, and betatron oscillations in an accelerator. From this base, we explore the impact of field errors and nonlinear resonances. This part ends with the concept of the distribution function and an introduction to the kinetic equation to describe large ensembles of charged particles and to supplement the previous single-particle analysis of beam dynamics. Part II focuses on classical electromagnetism and begins with an analysis of the electromagnetic field from relativistic beams, both in vacuum and in a resistive pipe. Plane electromagne...

  19. Vacuum exhaustion system for thermonuclear reactor and cryopump thereof

    International Nuclear Information System (INIS)

    Kobayashi, Shigetada.

    1992-01-01

    An impurity removing device is connected to a gas exhaust side of a plasma vacuum vessel by way of a gate valve, a cryopump is connected to the exit side of the device by way of an exit valve, a fuel transfer line is disposed for transferring fuels to a fuel purification system and a vacuum pump line is disposed to an exhaust gas line. Further, a tritium monitor is disposed to an exhaustion line and the line on the side of the exit of the monitor is branched into two ways, in which a tritium transfer pipe is disposed to one of them and an atmosphere release pipe is disposed on the other of them by way of an atmosphere releasing valve. Further, a condensation shebron is disposed for flowing in and out fuel isotope gases discharged from the plasma vacuum vessel, and a funnel discharge pipe is disposed for discharging a liquefied and condensed fluid. Since the gases to be exhausted are liquefied and condensed without coagulation or coagulation products are removed while operating the pump, the exhaust gases are processed continuously to reduce tritium inventory and make the regeneration step unnecessary and remarkably improve the heat efficiency. (N.H.)

  20. Advanced light source vacuum policy and vacuum guidelines for beamlines and experiment endstations

    International Nuclear Information System (INIS)

    Hussain, Z.

    1995-08-01

    The purpose of this document is to: (1) Explain the ALS vacuum policy and specifications for beamlines and experiment endstations. (2) Provide guidelines related to ALS vacuum policy to assist in designing beamlines which are in accordance with ALS vacuum policy. This document supersedes LSBL-116. The Advanced Light Source is a third generation synchrotron radiation source whose beam lifetime depends on the quality of the vacuum in the storage ring and the connecting beamlines. The storage ring and most of the beamlines share a common vacuum and are operated under ultra-high-vacuum (UHV) conditions. All endstations and beamline equipment must be operated so as to avoid contamination of beamline components, and must include proper safeguards to protect the storage ring vacuum from an accidental break in the beamline or endstation vacuum systems. The primary gas load during operation is due to thermal desorption and electron/photon induced desorption of contaminants from the interior of the vacuum vessel and its components. The desorption rates are considerably higher for hydrocarbon contamination, thus considerable emphasis is placed on eliminating these sources of contaminants. All vacuum components in a beamline and endstation must meet the ALS vacuum specifications. The vacuum design of both beamlines and endstations must be approved by the ALS Beamline Review Committee (BRC) before vacuum connections to the storage ring are made. The vacuum design is first checked during the Beamline Design Review (BDR) held before construction of the beamline equipment begins. Any deviation from the ALS vacuum specifications must be approved by the BRC prior to installation of the equipment on the ALS floor. Any modification that is incorporated into a vacuum assembly without the written approval of the BRC is done at the user's risk and may lead to rejection of the whole assembly

  1. Seawater desalination with solar-energy-integrated vacuum membrane distillation system

    Directory of Open Access Journals (Sweden)

    Fang Wang

    2017-03-01

    Full Text Available This study designed and tested a novel type of solar-energy-integrated vacuum membrane distillation (VMD system for seawater desalination under actual environmental conditions in Wuhan, China. The system consists of eight parts: a seawater tank, solar collector, solar cooker, inclined VMD evaporator, circulating water vacuum pump, heat exchanger, fresh water tank, and brine tank. Natural seawater was used as feed and a hydrophobic hollow-fiber membrane module was used to improve seawater desalination. The experiment was conducted during a typical summer day. Results showed that when the highest ambient temperature was 33 °C, the maximum value of the average solar intensity was 1,080 W/m2. The system was able to generate 36 kg (per m2 membrane module distilled fresh water during 1 day (7:00 am until 6:00 pm, the retention rate was between 99.67 and 99.987%, and electrical conductivity was between 0.00276 and 0.0673 mS/cm. The average salt rejection was over 90%. The proposed VMD system shows favorable potential application in desalination of brackish waters or high-salt wastewater treatment, as well.

  2. Diagnosis of Acceleration, Reconnection, Turbulence, and Heating

    Science.gov (United States)

    Dufor, Mikal T.; Jemiolo, Andrew J.; Keesee, Amy; Cassak, Paul; Tu, Weichao; Scime, Earl E.

    2017-10-01

    The DARTH (Diagnosis of Acceleration, Reconnection, Turbulence, and Heating) experiment is an intermediate-scale, experimental facility designed to study magnetic reconnection at and below the kinetic scale of ions and electrons. The experiment will have non-perturbative diagnostics with high temporal and three-dimensional spatial resolution, giving it the capability to investigate kinetic-scale physics. Of specific scientific interest are particle acceleration, plasma heating, turbulence and energy dissipation during reconnection. Here we will describe the magnetic field system and the two plasma guns used to create flux ropes that then merge through magnetic reconnection. We will also describe the key diagnostic systems: laser induced fluorescence (LIF) for ion vdf measurements, a 300 GHz microwave scattering system for sub-mm wavelength fluctuation measurements and a Thomson scattering laser for electron vdf measurements. The vacuum chamber is designed to provide unparalleled access for these particle diagnostics. The scientific goals of DARTH are to examine particle acceleration and heating during, the role of three-dimensional instabilities during reconnection, how reconnection ceases, and the role of impurities and asymmetries in reconnection. This work was supported by the by the O'Brien Energy Research Fund.

  3. 14C Accelerator mass spectrometry in Brazil

    International Nuclear Information System (INIS)

    Macario, K.D.; Gomes, P.R.S.; Anjos, Roberto M.; Linares, R.; Queiroz, E.A.; Oliveira, F.M.; Cardozo, L.; Carvalho, C.R.A.

    2011-01-01

    Radiocarbon Accelerator Mass Spectrometry is an ultra-sensitive technique that enables the direct measurement of carbon isotopes in samples as small as a few milligrams. The possibility of dating or tracing rare or even compound specific carbon samples has application in many fields of science such as Archaeology, Geosciences and Biomedicine. Several kinds of material such as wood, charcoal, carbonate and bone can be chemically treated and converted to graphite to be measured in the accelerator system. The Physics Institute of Universidade Federal Fluminense (UFF), in Brazil will soon be able to perform the complete 14 C-AMS measurement of samples. At the Nuclear Chronology Laboratory (LACRON) samples are prepared and converted to carbon dioxide. A stainless steel vacuum system was constructed for carbon dioxide purification and graphitization is performed in sealed tubes in a muffle oven. Graphite samples will be analyzed in a 250 kV Single Stage Accelerator produced by National Electrostatic Corporation which will be installed in the beginning of 2012. With the sample preparation laboratory at LACRON and the SSAMS system, the Physics Institute of UFF will be the first 14 C-AMS facility in Latin America. (author)

  4. Numerical and Experimental Investigations of the Effect of PVD and Vacuum Pressure on the Degree of Saturation

    Directory of Open Access Journals (Sweden)

    Ala Nasir Aljorany

    2018-12-01

    Full Text Available Soft clays are generally characterized by low shear strength, low permeability and high compressibility. An effective method to accelerate consolidation of such soils is to use vertical drains along with vacuum preloading to encourage radial flow of water. In this research numerical modeling of prefabricated vertical drains with vacuum pressure was done to investigate the effect of using vertical drains together with vacuum pressure on the degree of saturation of fully and saturated-unsaturated soft soils. Laboratory experiments were conducted by using a specially-designed large consolidometer cell where a central drain was installed and vacuum pressure was applied. All tests were conducted with a vacuum pressure of 40 kPa applied for a period of 30 days where a degree of soil consolidation of 90% was attained. At the end of the test period fifteen samples were taken from different locations distributed along the depth and radially to measure the water content. Consolidation settlements were recorded with time for all tests. The results showed that using vacuum pressure with vertical drains is a very effective method to accelerate consolidation of soils. As the thickness of unsaturated top layer increases, the settlement of soil surface decreases. The water content decreased after 30 days of application of the vacuum pressure.

  5. CAS Accelerator Physics (High-Power Hadron Machines) in Spain

    CERN Multimedia

    CAS

    2011-01-01

    The CERN Accelerator School (CAS) and ESS-Bilbao jointly organised a specialised course on High-Power Hadron Machines, held at the Hotel Barceló Nervión in Bilbao, Spain, from 24 May to 2 June, 2011.   CERN Accelerator School students. After recapitulation lectures on the essentials of accelerator physics and review lectures on the different types of accelerators, the programme focussed on the challenges of designing and operating high-power facilities. The particular problems for RF systems, beam instrumentation, vacuum, cryogenics, collimators and beam dumps were examined. Activation of equipment, radioprotection and remote handling issues were also addressed. The school was very successful, with 69 participants of 22 nationalities. Feedback from the participants was extremely positive, praising the expertise and enthusiasm of the lecturers, as well as the high standard and excellent quality of their lectures. In addition to the academic programme, the participants w...

  6. Cold Vacuum Drying facility personnel monitoring system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) instrument air (IA) system that provides instrument quality air to the CVDF. The IA system provides the instrument quality air used in the process, HVAC, and HVAC instruments. The IA system provides the process skids with air to aid in the purging of the annulus of the transport cask. The IA system provides air for the solenoid-operated valves and damper position controls for isolation, volume, and backdraft in the HVAC system. The IA system provides air for monitoring and control of the HVAC system, process instruments, gas-operated valves, and solenoid-operated instruments. The IA system also delivers air for operating hand tools in each of the process bays

  7. Modeling of complex gas distribution systems operating under any vacuum conditions: Simulations of the ITER divertor pumping system

    International Nuclear Information System (INIS)

    Vasileiadis, N.; Tatsios, G.; Misdanitis, S.; Valougeorgis, D.

    2016-01-01

    Highlights: • An integrated s/w for modeling complex rarefied gas distribution systems is presented. • Analysis is based on kinetic theory of gases. • Code effectiveness is demonstrated by simulating the ITER divertor pumping system. • The present s/w has the potential to support design work in large vacuum systems. - Abstract: An integrated software tool for modeling and simulation of complex gas distribution systems operating under any vacuum conditions is presented and validated. The algorithm structure includes (a) the input geometrical and operational data of the network, (b) the definition of the fundamental set of network loops and pseudoloops, (c) the formulation and solution of the mass and energy conservation equations, (d) the kinetic data base of the flow rates for channels of any length in the whole range of the Knudsen number, supporting, in an explicit manner, the solution of the conservation equations and (e) the network output data (mainly node pressures and channel flow rates/conductance). The code validity is benchmarked under rough vacuum conditions by comparison with hydrodynamic solutions in the slip regime. Then, its feasibility, effectiveness and potential are demonstrated by simulating the ITER torus vacuum system with the six direct pumps based on the 2012 design of the ITER divertor. Detailed results of the flow patterns and paths in the cassettes, in the gaps between the cassettes and along the divertor ring, as well as of the total throughput for various pumping scenarios and dome pressures are provided. A comparison with previous results available in the literature is included.

  8. Tailored vacuum chambers for ac magnets

    International Nuclear Information System (INIS)

    Harvey, A.

    1985-01-01

    The proposed LAMPF-II accelerator has a 60-Hz booster synchrotron and a 3-Hz main ring. To provide a vacuum enclosure inside the magnets with low eddy-current losses and minimal field distortion, yet capable of carrying rf image currents and providing beam stabilization, we propose an innovative combination pipe. Structurally, the enclosure is high-purity alumina ceramic, which is strong, radiation resistant, and has good vacuum properties. Applied to the chamber are thin, spaced, silver conductors using adapted thick-film technology. The conductor design can be tailored to the stabilization requirements, for example, longitudinal conductors for image currents, circumferential for transverse stabilization. The inside of the chamber has a thin, resistive coating to avoid charge build-up. The overall 60-Hz power loss is less than 100 W/m

  9. Concurrent control system for the JAERI tandem accelerator

    International Nuclear Information System (INIS)

    Hanashima, S.; Shoji, T.; Horie, K.; Tsukihashi, Y.

    1992-01-01

    Concurrent processing with a multiprocessor system is introduced to the particle accelerator control system region. The control system is a good application in both logical and physical aspects. A renewal plan of the control system for the JAERI tandem accelerator is discussed. (author)

  10. Regulating vacuum pump speed with feedback control

    International Nuclear Information System (INIS)

    Ludington, D.C.; Aneshansley, D.J.; Pellerin, R.; Guo, F.

    1992-01-01

    Considerable energy is wasted by the vacuum pump/motor on dairy farms. The output capacity (m 3 /min or cfm) of the vacuum pump always exceeds the capacity needed to milk cows and wash pipelines. Vacuum pumps run at full speed and load regardless of actual need for air. Excess air is admitted through a controller. Energy can be saved from electrical demand reduced by regulating vacuum pump speed according to air based on air usage. An adjustable speed drive (ASD) on the motor and controlled based upon air usage, can reduce the energy used by the vacuum pump. However, the ASD unit tested could not maintain vacuum levels within generally accepted guidelines when air usage changed. Adding a high vacuum reserve and a dual vacuum controller between the vacuum pump and the milking pipeline brought vacuum stability within guidelines. The ASD/dual vacuum system can reduce energy consumption and demand by at least 50 percent during milking and provide better vacuum stability than conventional systems. Tests were not run during washing cycles. Using 1990 costs and only the energy saved during milking, the simple payback on investment in new equipment for a 5 hp motor, speed controller and vacuum regulator would be about 5 years

  11. Modern vacuum physics

    CERN Document Server

    Chambers, Austin

    2005-01-01

    Modern Vacuum Physics presents the principles and practices of vacuum science and technology along with a number of applications in research and industrial production. The first half of the book builds a foundation in gases and vapors under rarefied conditions, The second half presents examples of the analysis of representative systems and describes some of the exciting developments in which vacuum plays an important role. The final chapter addresses practical matters, such as materials, components, and leak detection. Throughout the book, the author''s explanations are presented in terms of first principles and basic physics, augmented by illustrative worked examples and numerous figures.

  12. Cold Vacuum Drying Safety Class Instrumentation and Control System Design Description SYS 93-2

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) Safety Class Instrumentation and Control system (SCIC). The SCIC provides safety functions and features to protect the environment, off-site and on-site personnel and equipment. The function of the SCIC is to provide automatic trip features, valve interlocks, alarms, indication and control for the cold vacuum drying process

  13. Statistics of vacuum breakdown in the high-gradient and low-rate regime

    Directory of Open Access Journals (Sweden)

    Walter Wuensch

    2017-01-01

    Full Text Available In an increasing number of high-gradient linear accelerator applications, accelerating structures must operate with both high surface electric fields and low breakdown rates. Understanding the statistical properties of breakdown occurrence in such a regime is of practical importance for optimizing accelerator conditioning and operation algorithms, as well as of interest for efforts to understand the physical processes which underlie the breakdown phenomenon. Experimental data of breakdown has been collected in two distinct high-gradient experimental set-ups: A prototype linear accelerating structure operated in the Compact Linear Collider Xbox 12 GHz test stands, and a parallel plate electrode system operated with pulsed DC in the kV range. Collected data is presented, analyzed and compared. The two systems show similar, distinctive, two-part distributions of number of pulses between breakdowns, with each part corresponding to a specific, constant event rate. The correlation between distance and number of pulses between breakdown indicates that the two parts of the distribution, and their corresponding event rates, represent independent primary and induced follow-up breakdowns. The similarity of results from pulsed DC to 12 GHz rf indicates a similar vacuum arc triggering mechanism over the range of conditions covered by the experiments.

  14. Commissioning of the helium cryogenic system for the HIE- ISOLDE accelerator upgrade at CERN

    International Nuclear Information System (INIS)

    Delruelle, N; Inglese, V; Leclercq, Y; Pirotte, O; Williams, L

    2015-01-01

    The High Intensity and Energy ISOLDE (HIE-ISOLDE) project is a major upgrade of the existing ISOLDE and REX-ISOLDE facilities at CERN. The most significant improvement will come from replacing the existing REX accelerating structure by a superconducting linear accelerator (SC linac) composed ultimately of six cryo-modules installed in series, each containing superconducting RF cavities and solenoids operated at 4.5 K. In order to provide the cooling capacity at all temperature levels between 300 K and 4.5 K for the six cryo-modules, an existing helium refrigerator, manufactured in 1986 and previously used to cool the ALEPH magnet during LEP operation from 1989 to 2000, has been refurbished, reinstalled and recommissioned in a dedicated building located next to the HIE-ISOLDE experimental hall. This helium refrigerator has been connected to a new cryogenic distribution line, consisting of a 30-meter long vacuum-insulated transfer line, a 2000-liter storage dewar and six interconnecting valve boxes, one for each cryo-module. This paper describes the whole cryogenic system and presents the commissioning results including the preliminary operation at 4.5 K of the first cryo- module in the experimental hall. (paper)

  15. Definition and means of maintaining the process vacuum liquid detection interlock systems portion of the PFP safety envelope

    International Nuclear Information System (INIS)

    THOMAS, R.J.

    1999-01-01

    The Process Vacuum Liquid Detection interlock systems prevent intrusion of process liquids into the HEPA filters downstream of demisters No.6 and No.7 during Process Vacuum System operation. This prevents liquid intrusion into the filters, which could cause a criticality. The Safety Envelope (SE) includes the equipment, which detects the presence of liquids in the vacuum headers; isolates the filters; shuts down the vacuum pumps; and alarms the condition. This report identifies the equipment in the SE operating, maintenance, and surveillance procedures needed to maintain the SE equipment; and rationale for exclusion of some equipment and testing from the SE

  16. arXiv Analytical methods for vacuum simulations in high energy accelerators for future machines based on LHC performances

    CERN Document Server

    Aichinger, Ida; Chiggiato, Paolo

    The Future Circular Collider (FCC), currently in the design phase, will address many outstanding questions in particle physics. The technology to succeed in this 100 km circumference collider goes beyond present limits. Ultra-high vacuum conditions in the beam pipe is one essential requirement to provide a smooth operation. Different physics phenomena as photon-, ion- and electron- induced desorption and thermal outgassing of the chamber walls challenge this requirement. This paper presents an analytical model and a computer code PyVASCO that supports the design of a stable vacuum system by providing an overview of all the gas dynamics happening inside the beam pipes. A mass balance equation system describes the density distribution of the four dominating gas species $\\text{H}_2, \\text{CH}_4$, $\\text{CO}$ and $\\text{CO}_2$. An appropriate solving algorithm is discussed in detail and a validation of the model including a comparison of the output to the readings of LHC gauges is presented. This enables the eval...

  17. A design study of the vacuum system of the Daresbury X-8 experimental line

    International Nuclear Information System (INIS)

    Brand, J.F.J. van den.

    1982-03-01

    This paper deals with the front-end vacuum system of the X 8 beam line at the Daresbury synchrotron radiation source. The vacuum system is represented by a matrix to allow calculation of pressure profiles for many sets of pumping-speed and desorption parameters. It is shown that for a mass spectrum consisting mainly of CO and N 2 it is possible to operate the machine side of the front-end system in the 10 -10 Torr pressure region and proof is given that the two conductance-stage can provide a pressure difference of 1:100. (Auth.)

  18. Architecture of the modern accelerator control system

    International Nuclear Information System (INIS)

    Samardzic, B.; Drndarevic, V.

    2000-01-01

    Well defined concept of the system and construction plan are the important conditions for the successful realization of the accelerator control system. In this paper the modern concept of accelerator control system as well as guidelines for its efficient development have been presented. Described concept could be applied for the design of control systems for other types of facilities for experimental physics and for industrial process control. (author)

  19. JACoW Integration of the vacuum SCADA with CERN's Enterprise Asset Management system

    CERN Document Server

    Rocha, Andre; Fraga, Jorge; Gkioka, Georgia; Gomes, Paulo; Gonzalez, Luis; Krastev, Tsvetelin; Riddone, Germana; Widegren, David

    2018-01-01

    With over 128Km of vacuum chambers, reaching pressures as low as in interstellar space, CERN is home to the largest vacuum system in the world. Its underlying architecture comprises approximately 15 000 pieces of control equipment, supervised and controlled by 7 Supervisory Control And Data Acquisition (SCADA) servers, and over 300 Programmable Logic Controllers (PLCs). Their configuration files are automatically generated from a set of ORACLE databases (vacDB) using a Java application (vacDB-Editor). The maintenance management of such an amount of equipment requires the usage of an Enterprise Asset Management system (EAM), where the life cycle of every equipment is tracked from reception through decommissioning. The equipment displayed in the vacuum SCADA is automatically integrated in its user interfaces (UIs) based on data available on vacDB. On the other hand, the equipment available in Infor-EAM for maintenance management activities (creation of work-orders, stock management, location tracking) resides i...

  20. Design of large aperture, low mass vacuum windows

    International Nuclear Information System (INIS)

    Mapes, M.; Leonhardt, W.J.

    1993-01-01

    Large aperture, low mass, thin vacuum windows are required to minimize beam loss in the beam lines of particle accelerators as the products of nuclear collisions move from upstream targets to downstream detectors. This article describes the design, fabrication, testing, and operating experience of a large rectangular vacuum window, 122 cmx61 cm, and two circular windows of 91.4 and 96.5 cm diam. These window designs utilize a composite Kevlar 29 fabric and Mylar laminate as a window material with a typical combined thickness of 0.35 mm. Data for several material thicknesses are also presented. The windows are usually designed to withstand a pressure differential of two to three atmospheres to achieve the required factor of safety. These windows are typically used in the medium vacuum range of 10 -4 Torr. The equations used to predict the behavior of the window material will also be discussed

  1. Development of a high intensity proton accelerator

    International Nuclear Information System (INIS)

    Mizumoto, Motoharu; Kusano, Joichi; Hasegawa, Kazuo; Ito, Nobuo; Oguri, Hidetomo; Touchi, Yutaka; Mukugi, Ken; Ino, Hiroshi

    1997-01-01

    The high-intensity proton linear accelerator with a beam power of 15 MW has been proposed for various engineering tests for the nuclear waste transmutation system as one of the research plans in the Neutron Science Research Program (NSRP) in JAERI. High intensity proton beam and secondary particle beams such as neutron, pion, muon and unstable radio isotope (RI) beam generated from the proton spallation reaction will be utilized at these facilities in each research field. The R and D work has been carried out for the components of the front-end part of the proton accelerator; ion source, RFQ, DTL and RF source. In the beam test, the current of 70 mA with a duty factor of 7% has been accelerated from the RFQ at the energy of 2 MeV. A hot test model of the DTL for the high power and high duty operation was fabricated and tested. For the high energy portion above 100 MeV, superconducting accelerating cavity is studied as a main option. The superconducting linac is expected to have several favourable characteristics for high intensity accelerator such as short accelerator length, large bore radius resulting in low beam losses and cost effectiveness for construction and operation. A test stand with equipment of cryogenics system, vacuum system, RF system and cavity processing and cleaning is prepared to test the physics issues and fabrication process. The proposed plan for accelerator design and construction will compose of two consecutive stages. The first stage will be completed in about 7 years with the beam power of 1.5 MW. As the second stage gradual upgrading of the beam power will be made up to 15 MW. 7 refs., 3 figs., 4 tabs

  2. Numerical Study on Radiation Effects to Evaporator in Natural Vacuum Solar Desalination System

    Science.gov (United States)

    Siregar, R. E. T.; Ronowikarto, A. D.; Setyawan, E. Y.; Ambarita, H.

    2018-01-01

    The need for clean water is increasing day by day due to the increasing factor of living standard of mankind, hence designed natural vacuum solar desalination. The natural vacuum Solar desalination is studied experimentally. A small-scale natural vacuum desalination study consists of evaporator and condenser as the main components designed and manufactured. To transfer heat from the solar collector into the evaporator, the fluid transfer system uses a pump powered by a solar cell. Thus, solar collectors are called hybrid solar collectors. The main purpose of this exposure is to know the characteristics of the radiation effects on incoming energy on the evaporator during the process. This system is tested by exposing the unit to the solar radiation in the 4th floor building in Medan. The experiment was conducted from 8.00 to 16.00 local time. The results show that natural vacuum solar desalination with hybrid solar collectors can be operated perfectly. If the received radiation is high, then the incoming energy received by the evaporator will also be high. From measurements with HOBO microstation, obtained the highest radiation 695.6 W/m2, and the calculation result of incoming energy received evaporator obtained highest result 1807.293 W.

  3. Cryogenic systems for detectors and particle accelerators

    International Nuclear Information System (INIS)

    Sondericker, J.H.

    1988-01-01

    It's been one hundred years since the first successful experiments were carried out leading to the liquefaction of oxygen which birthed the field of cryogenics and about sixty years since cryogenics went commercial. Originally, cryogenics referred to the technology and art of producing low temperatures but today the definition adopted by the XII Congress of the International Institute of Refrigeration describes cryogenics as the study of phenomena, techniques, and concepts occurring at our pertaining to temperatures below 120 K. Modern acceptance of the importance and use of cryogenic fluids continues to grow. By far, the bulk of cryogenic products are utilized by industry for metal making, agriculture, medicine, food processing and as efficient storage of fuels. Cryogenics has found many uses in the scientific community as well, enabling the development of ultra low noise amplifiers, fast cold electronics, cryopumped ultra high vacuums, the production of intense magnetic fields and low loss power transmission through the sue of cryogenically cooled superconductors. High energy physic research has been and continues to use cryogenic hardware to produce liquids used as detector targets and to produce refrigeration necessary to cool superconducting magnets to design temperature for particle accelerator applications. In fact, today's super accelerators achieve energies that would be impossible to reach with conventional copper magnets, demonstrating that cryogenics has become an indispensable ingredient in today's scientific endeavors

  4. Indian Vacuum Society: The Indian Vacuum Society

    Science.gov (United States)

    Saha, T. K.

    2008-03-01

    expert members on the subject to deliver lectures and take part in devising courses in the universities. IVS publishes a quarterly called the `Bulletin of Indian Vacuum Society' since its inception, in which articles on vacuum and related topics are published. NIRVAT, news, announcements, and reports are the other features of the Bulletin. The articles in the Bulletin are internationally abstracted. The Bulletin is distributed free to all the members of the society. The society also publishes proceedings of national/international symposia and seminars, manuals, lecture notes etc. It has published a `Vacuum Directory' containing very useful information on vacuum technology. IVS has also set up its own website http://www.ivsnet.org in January 2002. The website contains information about IVS, list of members, list of EC members, events and news, abstracts of articles published in the `Bulletin of Indian Vacuum Society', utilities, announcements, reports, membership and other forms which can be completed online and also gives links to other vacuum societies. Our Society has been a member of the executive council of the International Union of Vacuum Science, Techniques and Applications (IUVSTA) and its various committees since 1970. In 1983 IVS conducted an International Symposium on Vacuum Technology and Nuclear Applications in BARC, Mumbai, under the sponsorship of IUVSTA. In 1987 IVS arranged the Triennial International Conference on Thin Films in New Delhi, where more than 200 foreign delegates participated. IVS also hosted the IUVSTA Executive Council Meeting along with the conference. The society organized yet again an International Conference on Vacuum Science and Technology and SRS Vacuum Systems at CAT, Indore in1995. IVS arranges the prestigious Professor Balakrishnan Memorial Lecture in memory of its founder vice-president. Leading scientists from India and abroad in the field are invited to deliver the talks. So far 23 lectures have been held in this series. IVS

  5. Surge-damping vacuum valve

    International Nuclear Information System (INIS)

    Bullock, J.C.; Kelley, B.E.

    1977-01-01

    A valve for damping out flow surges in a vacuum system is described. The surge-damping mechanism consists of a slotted, spring-loaded disk adjacent to the valve's vacuum port (the flow passage to the vacuum roughing pump). Under flow surge conditions, the differential pressure forces the disk into a sealing engagement with the vacuum port, thereby restricting the gas flow path to narrow slots in the disk's periphery. The increased flow damps out the flow surge. When pressure is equalized on both sides of the valve, the spring load moves the disk away from the port to restore full flow conductance through the valve

  6. The design of high vacuum system for baby electron beam machine (baby ebm): a comparison between theoretical and experimental

    International Nuclear Information System (INIS)

    Mohd Rizal Mamat; Rosli Darmawan; Lee Chee Huei; Mohd Rizal Md Chulan; Leo Kwee Wah; Muhamad Zahidee Taat; Fadzlie Nordin; Abu Bakar Mhd Ghazali

    2005-01-01

    Baby ebm which was developed to study the engineering and physics of electrons requires the use of high vacuum system in order to prevent electron loss and ionization of air molecules. In selecting the high vacuum system for baby ebm two main factors were considered: the ultimate pressure and the pump down time. The ultimate pressure required for the operation of the baby ebm is in 10-7 torr range. The pump down time was estimated from calculations, taking into account the vacuum pump and chamber size. The turbomolecular pump system (tmp), which is capable of achieving the required vacuum level was selected as the high vacuum system and installed to baby ebm. The tmp is currently fully operational. It was found that the vacuum pumping performance of the tmp differs considerably from what the calculations indicate. Compared to the calculations, it takes a much longer time to achieve the required operating pressure of baby ebm. This could be due to the fact that the formula used for the calculations was a very simplified formula that takes into account the main factors only which are the vacuum pump and chamber size. This paper attempts to present the comparison of the tmp performance between the theoretical and experimental. (Author)

  7. 0.56 GeV laser electron acceleration in ablative-capillary-discharge plasma channel

    International Nuclear Information System (INIS)

    Kameshima, Takashi; Kurokawa, Shin-ichi; Nakajima, Kazuhisa; Hong Wei; Wen Xianlun; Wu Yuchi; Tang Chuanming; Zhu Qihua; Gu Yuqiu; Zhang Baohan; Peng Hansheng; Sugiyama, Kiyohiro; Chen, Liming; Tajima, Toshiki; Kumita, Tetsuro

    2008-01-01

    A high-quality electron beam with a central energy of 0.56 GeV, an energy spread of 1.2% rms, and a divergence of 0.59 mrad rms was produced by means of a 4 cm ablative-capillary-discharge plasma channel driven by a 3.8 J27 fs laser pulse. This is the first demonstration of electron acceleration with an ablative capillary discharge wherein the capillary is stably operated in vacuum with a simple system triggered by a laser pulse. This result of the generation of a high-quality beam provides the prospects to realize a practical accelerator based on laser-plasma acceleration. (author)

  8. Non-Evaporable Getter Thin Film Coatings for Vacuum Applications

    CERN Document Server

    Prodromides, A E

    2002-01-01

    Getters are solid materials capable of chemisorbing gas molecules on their surface: getters are chemical pumps. They are widely used for a variety of applications such as in particle accelerators, vacuum tubes, field-emission display (FED), inert gas purification systems, H2 plasma purification, hydrogen species recycling as in the Tokamak Fusion Test Reactor. Among the different Non-Evaporable Getter (NEG) materials tested, the TiZrV alloys have the lowest activation temperature. For this reason, the TiZrV coatings were the object of this work. In particular, the aim of this investigation was to understand how to optimise three important properties of TiZrV coatings: to achieve the lowest possible activation temperature (Ta), and to obtain the highest pumping speed and surface pumping capacity. This objective is important in the context of the Large Hadron Collider (LHC) accelerator, since, before this work, the understanding and the knowledge of the TiZrV coatings properties were insufficient to adopt it fo...

  9. A Magnetostrictive Tuning System for Particle Accelerators

    CERN Document Server

    Tai, Chiu-Ying; Daly, Edward; Davis, Kirk; Espinola, William; Han, Zhixiu; Joshi, Chandrashekhar; Mavanur, Anil; Racz, Livia; Shepard, Kenneth

    2005-01-01

    Energen, Inc. has designed, built, and demonstrated several fast and slow tuners based on its magnetostrictive actuators and stepper motor. These tuners are designed for Superconducting Radio Frequency (SRF) cavities, which are important structures in particle accelerators that support a wide spectrum of disciplines, including nuclear and high-energy physics and free electron lasers (FEL). In the past two years, Energen's work has focused on magnetostrictive fast tuners for microphonics and Lorentz detuning compensation on elliptical-cell and spoke-loaded cavities, including the capability for real-time closed-loop control. These tuners were custom designed to meet specific requirements, which included a few to 100 micron stroke range, hundreds to kilohertz operation frequency, and cryogenic temperature operation in vacuum or liquid helium. These tuners have been tested in house and at different laboratories, such as DESY, Argonne National Lab, and Jefferson Lab. Some recent results are presented in this pape...

  10. Ultrathin Polyimide-Stainless Steel Heater for Vacuum System Bake-out

    CERN Document Server

    Rathjen, Christian; Henrist, Bernard; Kölemeijer, Wilhelmus; Libera, Bruno; Lutkiewicz, Przemyslaw

    2005-01-01

    Space constraints in several normal conducting magnets of the LHC required the development of a dedicated permanent heater for vacuum chamber bake-out. The new heater consists of stainless steel bands inside layers of polyimide. The overall heater thickness is about 0.3 mm. The low magnetic permeability is suitable for applications in magnetic fields. The material combination allows for temperatures high enough to activate a NEG coating. Fabrication is performed in consecutive steps of tape wrapping. Automation makes high volume production at low costs possible. About 800 m of warm vacuum system of the long straight sections of the LHC will be equipped with the new heater. This paper covers experience gained at CERN from studies up to industrialization.

  11. A high performance architecture for accelerator controls

    International Nuclear Information System (INIS)

    Allen, M.; Hunt, S.M; Lue, H.; Saltmarsh, C.G.; Parker, C.R.C.B.

    1991-01-01

    The demands placed on the Superconducting Super Collider (SSC) control system due to large distances, high bandwidth and fast response time required for operation will require a fresh approach to the data communications architecture of the accelerator. The prototype design effort aims at providing deterministic communication across the accelerator complex with a response time of < 100 ms and total bandwidth of 2 Gbits/sec. It will offer a consistent interface for a large number of equipment types, from vacuum pumps to beam position monitors, providing appropriate communications performance for each equipment type. It will consist of highly parallel links to all equipment: those with computing resources, non-intelligent direct control interfaces, and data concentrators. This system will give each piece of equipment a dedicated link of fixed bandwidth to the control system. Application programs will have access to all accelerator devices which will be memory mapped into a global virtual addressing scheme. Links to devices in the same geographical area will be multiplexed using commercial Time Division Multiplexing equipment. Low-level access will use reflective memory techniques, eliminating processing overhead and complexity of traditional data communication protocols. The use of commercial standards and equipment will enable a high performance system to be built at low cost

  12. A high performance architecture for accelerator controls

    International Nuclear Information System (INIS)

    Allen, M.; Hunt, S.M.; Lue, H.; Saltmarsh, C.G.; Parker, C.R.C.B.

    1991-03-01

    The demands placed on the Superconducting Super Collider (SSC) control system due to large distances, high bandwidth and fast response time required for operation will require a fresh approach to the data communications architecture of the accelerator. The prototype design effort aims at providing deterministic communication across the accelerator complex with a response time of <100 ms and total bandwidth of 2 Gbits/sec. It will offer a consistent interface for a large number of equipment types, from vacuum pumps to beam position monitors, providing appropriate communications performance for each equipment type. It will consist of highly parallel links to all equipments: those with computing resources, non-intelligent direct control interfaces, and data concentrators. This system will give each piece of equipment a dedicated link of fixed bandwidth to the control system. Application programs will have access to all accelerator devices which will be memory mapped into a global virtual addressing scheme. Links to devices in the same geographical area will be multiplexed using commercial Time Division Multiplexing equipment. Low-level access will use reflective memory techniques, eliminating processing overhead and complexity of traditional data communication protocols. The use of commercial standards and equipment will enable a high performance system to be built at low cost. 1 fig

  13. TFTR diagnostic vacuum controller

    International Nuclear Information System (INIS)

    Olsen, D.; Persons, R.

    1981-01-01

    The TFTR diagnostic vacuum controller (DVC) provides in conjunction with the Central Instrumentation Control and Data Acquisition System (CICADA), control and monitoring for the pumps, valves and gauges associated with each individual diagnostic vacuum system. There will be approximately 50 systems on TFTR. Two standard versions of the controller (A and B) wil be provided in order to meet the requirements of two diagnostic manifold arrangements. All pump and valve sequencing, as well as protection features, will be implemented by the controller

  14. Qualitative safety analysis in accelerator based systems

    International Nuclear Information System (INIS)

    Sarkar, P.K.; Chowdhury, Lekha M.

    2006-01-01

    In recent developments connected to high energy and high current accelerators, the accelerator driven systems (ADS) and the Radioactive Ion Beam (RIB) facilities come in the forefront of application. For medical and industrial applications high current accelerators often need to be located in populated areas. These facilities pose significant radiological hazard during their operation and accidental situations. We have done a qualitative evaluation of radiological safety analysis using the probabilistic safety analysis (PSA) methods for accelerator-based systems. The major contribution to hazard comes from a target rupture scenario in both ADS and RIB facilities. Other significant contributors to hazard in the facilities are also discussed using fault tree and event tree methodologies. (author)

  15. Accelerator control using RSX-11M and CAMAC

    International Nuclear Information System (INIS)

    Kulaga, J.E.

    1978-01-01

    This paper describes a computer-control system for a superconducting linear accelerator currently under development at Argonne National Laboratory. RSX-11M V3.1 running on a PDP 11/34 is used with CAMAC hardware to fully control 22 active beam-line elements and monitor critical accelerator conditions such as temperature, vacuum, and beam characteristics. This paper contrasts the use of an RSX compatible CAMAC driver for most CAMAC I/O operations and the use of the Connect-to-Interrupt Vector directive for fast ADC operation. The usage of table-driven software to achieve hardware configuration independence is discussed, along with the design considerations of the software interface between a human operator and a computer-control system featuring multi-function computer-readable control knobs and computer-writable displays which make up the operator's control console

  16. Radio frequency systems for present and future accelerators

    International Nuclear Information System (INIS)

    Raka, E.C.

    1987-01-01

    Rf systems are described for the FNAL Main Ring and Tevatron Ring, CERN SPS and LEP, and HERA proton acceleration system, CERN PS e + e/sup minus/ acceleration system, and CERN EPA monochromatic cavity. Low impedance rf systems in CERN ISR, the Brookhaven CBA, and SSC are also discussed

  17. Effects of an anode sheath on energy and momentum transfer in vacuum arcs

    International Nuclear Information System (INIS)

    Wang, Zhenxing; Zhou, Zhipeng; Tian, Yunbo; Wang, Haoran; Wang, Jianhua; Geng, Yingsan; Liu, Zhiyuan

    2017-01-01

    Anode phenomena under high-current vacuum arcs have a significant impact on the interrupting capacity of vacuum interrupters. However, the vacuum arc energy flux and momentum flux on the anode—which are necessary boundary conditions for simulations—are either set to an imaginary distribution or calculated using simple formulas without considering anode sheath regulatory effects. The objective of this paper is to reveal the anode sheath effects on regulating the energy and momentum transfer from the arc column to the anode surface in vacuum arcs. A particle-in-cell model for the anode sheath is developed. The required input parameters are obtained from a magnetohydrodynamic model for the arc column. From the results, there exists a sheath near the anode with a negative voltage drop. Both the electron density and the ion density significantly decline in the anode sheath region. The kinetic energy of the ions absorbed by the anode consists of directed kinetic energy, random kinetic energy, and sheath acceleration energy. The sheath acceleration energy contribution is the largest, and the random kinetic energy also accounts for a large part that cannot be ignored. The arc pressure on the anode surface is mainly caused by ion impact, and the accelerating effect of the anode sheath on the ions cannot be neglected in pressure calculations. In addition, in the case of an arc current at 15 kA, the input energy and momentum upon the anode surface is not obviously affected by the evaporated atoms at surface temperatures of 1600 K and 2000 K. (paper)

  18. Vacuum pumping concepts for ETF

    International Nuclear Information System (INIS)

    Homeyer, W.G.

    1980-09-01

    The Engineering Test Facility (ETF) poses unique vacuum pumping requirements due to its large size and long burn characteristics. These requirements include torus vacuum pumping initially and between burns and pumping of neutralized gas from divertor collector chambers. It was found that the requirements could be met by compound cryopumps in which molecular sieve 5A is used as the cryosorbent. The pumps, ducts, and vacuum valves required are large but fit with other ETF components and do not require major advances in vacuum pumping technology. Several additional design, analytical, and experimental studies were identified as needed to optimize designs and provide better design definition for the ETF vacuum pumping systems

  19. Accelerator optimization using a network control and acquisition system

    International Nuclear Information System (INIS)

    Geddes, Cameron G.R.; Catravas, P.E.; Faure, Jerome; Toth, Csaba; Tilborg, J. van; Leemans, Wim P.

    2002-01-01

    Accelerator optimization requires detailed study of many parameters, indicating the need for remote control and automated data acquisition systems. A control and data acquisition system based on a network of commodity PCs and applications with standards based inter-application communication is being built for the l'OASIS accelerator facility. This system allows synchronous acquisition of data at high (> 1 Hz) rates and remote control of the accelerator at low cost, allowing detailed study of the acceleration process

  20. Comments to accelerator-driven system

    International Nuclear Information System (INIS)

    Taka aki, Matsumoto

    2003-01-01

    Accelerator-driven system (ADS) that was a subcritical nuclear reactor driven by a high power proton accelerator was recently studied by several large organisations over the world. This paper described two comments for ADS: philosophical and technological ones. The latter was made from a view point of micro ball lightning (BL) that was newly discovered by the author. Negative and positive aspects of micro BL for ADS were discussed. (author)