WorldWideScience

Sample records for 2009-2020 plan indicatif

  1. Mars exploration strategy: 2009-2020

    Science.gov (United States)

    Syvertson, M.; McCleese, D.

    2003-01-01

    This document describes the planning processes used to achieve, and the outcome of, the sytrhesis that culminate in a strategy for the intensified scientific exploration of Mars in the time period from 2009-2020.

  2. Multi-annual planning of investments for heat production. 2009 - 2020 period

    International Nuclear Information System (INIS)

    A new Multi-annual Planning of Investments (PPI) for heat production in France has been realized in order to meet the conclusions of the Grenelle Environnement Forum for a better energy efficiency and a larger use of renewable energies. Based on quantitative data (the increase in heat production will reach more than 10 Mtoe by 2020), potential objectives have been assessed for the various heat production sources and techniques: wood, biomass (for buildings, district heating, industry and processes, cogeneration), deep and intermediary geothermal energy, individual heat pumps, individual and collective heat solar systems, biogas, etc. These objectives are said to be ambitious but reachable if every sources and techniques are thoroughly exploited

  3. Report to the Parliament 2009 - 2020 period. Multi-annual planning of investments for power generation

    International Nuclear Information System (INIS)

    A new Multi-annual Planning of Investments (PPI) for power generation in France has been realized in order to meet the conclusions of the Grenelle Environnement Forum for a better management of energy demand and a large investment program in non carbon energies. Some renewable energy development targets are set for 2020: 25000 MW for wind energy (19000 MW on land and 6000 MW on sea), 5400 MW for solar energy, 2300 MW for biomass energy, 3 TWh.year and a peak capacity of 3000 MW for hydroelectric power. Concerning nuclear energy, power plant operation will be optimized and two EPR-type reactors will be launched; the minimum required of conventional thermal power plants will be modernized in order to reduce its atmospheric emissions. Power systems in two regions (Brittany and PACA) will be reinforced

  4. National action plan for the promotion of renewable energies 2009-2020. In accordance with Article 4 of European Union Directive 2009/28/EC

    International Nuclear Information System (INIS)

    Article 4 of the renewable energy Directive (2009/28/EC) required Member States to submit national renewable energy action plans by 30 June 2010. These plans, were prepared in accordance with the template published by the Commission, and provide detailed road-maps of how each Member State expects to reach its legally binding 2020 target for the share of renewable energy in their final energy consumption. In their national renewable energy action plans Member States set out the sectoral targets, the technology mix they expect to use, the trajectory they will follow and the measures and reforms they will undertake to overcome the barriers to developing renewable energy. Since 2007, France has put in place an ambitious strategy for the development of renewable energies within its territory. A major national consultation, the 'Grenelle Environment Forum', was held from July to November 2007 and led to the emergence of priority targets in terms of controlling energy consumption and promoting renewable energies. It brought together all interested parties (State, local authorities, employers, Trade Unions and associations) and has been unanimously recognised as a solid starting point for later decisions in terms of sustainable development in the territory. Following this consultation, a working group met to establish a reference scenario to achieve the target of 23% of renewable energies in the total final energy consumption. The main determining factors in this scenario are, firstly, major efforts to control energy consumption, particularly in buildings where the scenario provides for a reduction of 38% in consumption by 2020, and, secondly, strong penetration by renewable energies with a targeted additional production of 20 mega-tons of oil equivalent (Mtoe) compared to 2006, or an approximate doubling in production of renewable energies by 2020. Regarding the control of energy consumption, residential and tertiary buildings have been identified as the biggest

  5. Pluri annual indicative plan of the investments in the gas sector; Plan indicatif pluriannuel des investissements dans le secteur du gaz Periode 2006-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-03-15

    This indicative plan constitutes the first report to the Parliament. It is a prospective document for the period 2006-2015 containing: a forecast of the gas demand increase, a description of main investments decided in matter of gas infrastructures, a diagnostic concerning the adequation between the supplying capacities in natural gas and the national needs, a series of recommendations on the State tools to guarantee the national supplying security and on the investment. The four parts deal with the stakes and perspectives of the national natural gas supplying, the demand evolution, the offer evolution and the equilibrium offer. (A.L.B.)

  6. Mars Exploration Strategy 2009-2020: white paper

    Science.gov (United States)

    Beaty, D. W.

    2003-01-01

    This document describes the planning processes used to achieve, and the outcome of, the synthesis that culminate in a strategy for the intensified scientific exploration of Mars in the time period from 2009 to 2020.

  7. Petroleum labour market information supply demand analysis 2009-2020

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Since 2006, the petroleum industry has been interested in collaboration to determine labour demand and supply/demand gaps for the upstream petroleum industry. In 2006, the petroleum industry experienced strong employment growth and was having difficulty finding workers. Comprehensive, up-to-date labour market information and analysis are the key foundation for addressing labour supply/demand issues. This document presented labour market information on the petroleum industry in order to inform company retention and recruitment offices; government departments involved in development of labour market policies and programs; education and training institutions; guidance counsellors, employment centres and organizations that work with youth and labour supply pools; and job seekers. Specific topics that were discussed included two industry scenarios (growth and base case) in determining the petroleum industry's medium-and long-term employment needs; labour supply/demand considerations for the industry as a whole and an industry-wide cost management; and an analysis of exploration and production, oil sands, services, and pipeline sectors to 2020. It was concluded that while new employment is not expected to lead to labour shortages within the pipeline sector, attrition due to requirements almost certainly would. In the growth scenario, it is likely the pipeline sector will be challenged by competition from the other petroleum industry sectors. tabs., figs., appendices.

  8. Climate policy programme for the Ministry of Transport and Communications' administrative sector for 2009-2020. A progress report 2012; Liikenne- ja viestintaeministerioen hallinnonalan ilmastopoliittinen ohjelma 2009-2020. Seuranta 2012

    Energy Technology Data Exchange (ETDEWEB)

    Jaeaeskelaeinen, S.

    2012-12-15

    According to preliminary data for 2011, greenhouse gas emissions from transport in Finland were approximately 13.2 million tonnes of carbon dioxide equivalent. This covers about one fifth of Finland's total GHG emissions and 40 per cent of emissions outside the emissions trading scheme. Some 90 per cent of emissions from transport in Finland are generated by road traffic. Out of these, approximately 60 per cent are caused by passenger vehicles, 35 per cent by vans and lorries, and the rest by buses, motorcycles, etc. Under the Kyoto Protocol and EU requirements, Finland is obliged to keep its GHG emissions at the 1990 level between 2008-2012. In 1990, greenhouse gas emissions from transport amounted to approximately 12.8 million tonnes CO{sub 2}-eq. After recovery from the recession of the early 1990s, greenhouse gas emissions started to increase. They grew steadily - by around 13 per cent - until 2007. As a result of the new recession in 2008-2009, emissions fell by almost 10 per cent, but resumed an upward trend in 2010. In 2011, on the other hand, emissions saw a decline of approximately 3 per cent in comparison to the previous year. Emissions from road transport have been found to reflect the general economic trends and the direction of transport performances: when the economy and transport performances grow, so do emissions, and vice versa. In 2011, however, road transport performances grew by 1.2 per cent from the 2010 figures, while emissions decreased by about 3 per cent. Therefore, it would seem that this time there were other reasons for reduced emissions than changes in transport performances. Such reasons are likely to include the increased use of biofuels in transport and the reduced specific emissions of new passenger cars. A further positive development discovered in the 2011 follow-up were larger passenger volumes of public transport, particularly in large urban regions. (orig.)

  9. Spatial planning

    OpenAIRE

    Dimitrov, Nikola; Koteski, Cane

    2016-01-01

    The professional book ,, Space planning "processed chapters on: space, concept and definition of space, space as a system, spatial economics, economic essence of space, space planning, social determinants of spatial planning, spatial planning as a process, factors development and elements in spatial planning, methodology, components and content of spatial planning stages and types of preparation of spatial planning, spatial planning and industrialization, industrialization, urbanization and s...

  10. Planning Lessons

    Institute of Scientific and Technical Information of China (English)

    Linda Jensen

    2007-01-01

    @@ Jensen's "Lesson Planning"article serves aS a guide fOr novice teachers who need to create formalized lesson plans.The article covers why,when,and how teachers plan lessons,as well aS basic lesson plan principles and a lesson plan template.

  11. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  12. Safety Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Swan Lake National Wildlife Refuge Safety Plan discusses policies for the safety of the station employees, volunteers, and public. This plan seeks to identify...

  13. Planning Diseases.

    Science.gov (United States)

    Gabel, Medard

    1984-01-01

    To solve societal problems, both local and global, a global approach is needed. Serious diseases that are crippling present-day problem solving and planning are discussed, and the characteristics of a healthy, effective planning approach are described. (RM)

  14. Marketing plan

    OpenAIRE

    Hejňáková, Renata

    2014-01-01

    The aim of this bachelor's work is an exemplification applicability individual aspects of marketing planning Y company in the conclusion is drown a marketing plan up with advising action programs for year 2014. The theoretical part is defined by marketing and stadium of marketing planning using descriptive models and comparison technical literature. At the conclusion is drown a marketing plan up. The practical part is made on the base of gained information by semistructured interview with a m...

  15. Fire Plans

    Science.gov (United States)

    Power, June

    2011-01-01

    Many libraries have disaster recovery plans, but not all have prevention and action plans to prepare for an emergency in advance. This article presents the author's review of the prevention and action plans of several libraries: (1) Evergreen State College; (2) Interlochen Public Library; (3) University of Maryland, Baltimore-Marshall Law Library;…

  16. Business plan

    OpenAIRE

    Monakov, Victor

    2011-01-01

    The aim of this bachelor's thesis is to prepare a business plan for web design courses in Prague and feasibility & efficiency evaluation of this type of business. In the theoretical part of my bachelor's thesis, I focus on important terms, structure and aspects of a business plan. In the practical part, I apply theoretical knowledge and create a real business plan.

  17. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    , business and other fields, and it is useful for all professionals, across a wide range of employment areas, who share an interest in renewing planning practice. Such an endeavour is seen as both important and timely, recognising that many complex planning tasks necessitate organisations – be they public...... or private – to engage in planning to prepare proactive decision-making....

  18. Business Plan

    OpenAIRE

    Neterda, Karel

    2012-01-01

    The objective of the diploma thesis is aimed at business plan for real estate agency. Theoretical part of the thesis focuses on basic definitions regarding new company establishment. As follows: business laws, legal form of companies, business grants and structure of the business plan. Practical part describes a business plan for real estate agency and evaluate the business environment and current competition through these methods: Porter Five Force Model, SWOT -- and PEST analyses. Further, ...

  19. Business plan

    OpenAIRE

    Bekesheva, Karina

    2013-01-01

    This Bachelor`s thesis is a business plan of the event agency. It consists of two parts: theoretical and practical. Theoretical part is based on theory from books and other re-sources. In theoretical part there are some definitions about entrepreneurship, business plan and some strategic analyses tools. In addition, it includes the history of entrepre-neurship in Kazakhstan. Practical part is focused on creation the business plan. It in-volves some external and internal analyses, marketing st...

  20. Inspection planning

    International Nuclear Information System (INIS)

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  1. Steel Planning

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    China releases a new plan for the iron and steel industry centered on industrial upgrades The new 12th Five-Year Plan (2011-15) for China’s iron and steel industry, recently released on the website of the Ministry of Industry and Information

  2. Test plan :

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  3. GRIPS Plan

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-31

    The GRIPS (Geothermal Resources Impact Projection Study) Commission was established by a Joint Powers Agreement between the California Counties of Lake, Mendocino, Napa, and Sonoma. The objectives of GRIPS are primarily to develop and use a cooperative environmental data collection and use system including natural, social, and economic considerations to facilitate their independent decisions and those of State and Federal agencies related to the environmental effects of geothermal development. This GRIPS Plan was prepared from a wide range of studies, workshops, and staff analyses. The plan is presented in four parts: summary and introduction; environmental data status report; planned programs; and budget. (MHR)

  4. Sign Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Sign Plan explains how signs are used on the Refuge to help guide and educate visitors. An inventory of current signs is...

  5. Planning Inequality

    DEFF Research Database (Denmark)

    Mandersheid, Katharina; Richardson, Tim

    2011-01-01

    While traces and techniques of power and contestation around the understanding and production of spaces are clearly recognized in the sociological and planning research literature, there has been little rigorous attention to how socio-spatial inequality is put at stake in strategic mobilization...... around particular spatial imaginaries. In an analysis of the German Spatial Planning Report, the paper examines how inequalities are represented in relation to space and movement in spatial strategy. The analysis shows how, in the report, the spatial dimension of the social is represented...... is represented as something outside and fluid which is meant to be channelled into the territorial containers by means of regional development and spatial planning. These representations of the social suggest a territorialized culturally integrated society as the unquestioned frame of reference which has lost...

  6. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  7. Plan Repair using a Plan Library

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    Plan library's have proven their added value to the efficiency of planning. In this paper, we present results on the use of a plan library to plan repair. We show that using a relatively simple library, we can already obtain significant improvements in efficiency compared to plan repair without a li

  8. Multiemployer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  9. Planning your pregnancy

    Science.gov (United States)

    ... Pregnancy > Before or between pregnancies > Planning your pregnancy Planning your pregnancy E-mail to a friend Please ... partner as you start your family. Why is planning your pregnancy important? Planning your pregnancy can help ...

  10. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  11. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  12. Community development planning

    International Nuclear Information System (INIS)

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  13. Plan Colombia

    Directory of Open Access Journals (Sweden)

    Noam Chomsky

    2000-12-01

    Full Text Available Colombia recibe más ayuda militar de Estados Unidos que el resto de América Latina y el Caribe unidos, y esta situación puede profundizarse con la ejecución del Plan Colombia, fundamentado en la lucha antidrogas. Sin embargo, el pais ha sido calificado con el récord en violación de derechos humanos. En este contexto se aplica la reforma económica más significativa en la década de los noventa, generando condicionantes en los procesos de integración con sus vecinos. En concordancia con el secretario de Defensa, Henry Stimson, desde los años 60 Estados Unidos estaba autorizado para controlar su propio sistema regional, mientras todos los demás intenlos serian desmantelados. La presentación ambigua de esta política del gobierno estadounidense en Colombia es cómo disociar esta guerra contra la droga y la lucha irregular contrainsurgente En Estados Unidos hay otra opinión que debe conocerse para comprender las divergencias en e! interior de dicho país. Este artículo del prestigioso profesor universitario del MU, Noam Chomsky, es un referente obligado en términos de opinión pública y académica de dimensión internacional, por el inmenso respeto que infunde tanto en América como en Europa

  14. Multi-Agent Planning with Planning Graph

    NARCIS (Netherlands)

    Bui, The Duy; Jamroga, Wojciech

    2003-01-01

    In this paper, we consider planning for multi-agents situations in STRIPS-like domains with planning graph. Three possible relationships between agents' goals are considered in order to evaluate plans: the agents may be collaborative, adversarial or indifferent entities. We propose algorithms to dea

  15. 1991 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bear River Migratory Bird Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  16. Calfornia General Plans

    Data.gov (United States)

    California Department of Resources — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  17. Calfornia General Plans Rural

    Data.gov (United States)

    California Department of Resources — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  18. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  19. The ground based plan

    International Nuclear Information System (INIS)

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  20. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  1. Planning to Plan-Integrating Control Flow

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    In many planning situations, computation itself becomes a resource to be planned and scheduled. We model such computational resources as conventional resources which are used by control-flow actions, e.g., to direct the planning process. Control-flow actions and conventional actions are planned/scheduled in an integrated way and can interact with each other. Control-flow actions are then executed by the planning engine itself. The approach is illustrated by examples, e.g., for hierarchical planning, in which tasks that are temporally still far away impose only rough constraints on the current schedule, and control-flow tasks ensure that these tasks are refined as they approach the current time. Using the same mechanism, anytime algorithms can change appropriate search methods or parameters over time, and problems like scheduling critical time-outs for garbage collection can be made part of the planning itself.

  2. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  3. Marketing Planning: Feeniks Koulu

    OpenAIRE

    Raut, Biranjan

    2013-01-01

    Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is to come up with systematic marketing plan following structured process. Thesis employs qualitative research methodology following inductive reasoning approach. Thesis, initiates by outlining theoretical planning methods, which then is materialized into marketing plan with the help of empirical research. Discussion and...

  4. Planned hospital birth versus planned home birth

    DEFF Research Database (Denmark)

    Olsen, O.; Clausen, J.A.

    2012-01-01

    Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998.......Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998....

  5. Site Development Planning Handbook

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The Handbook provides facility managers and site planners at DOE organizations responsible for planning site developments and facilities utilization a step-by-step planning checklist to ensure that planners at each site are focusing on Department-wide goals and objectives. It begins with a brief discussion of a site development-by-objectives program design to promote, recognize, and implement opportunities for improvements in site utilization through planning. Additional information is included on: assembling existing data, plans, programs, and procedures; establishing realistic objectives; identifying site problems, opportunities; and development needs; determining priorities among development needs; developing short and long-range plans; choosing the right development solutions and meeting minimum legal site restrictions; presenting the plan; implementing elements of the plan; monitoring and reporting plan status; and modifying development program plans. (MCW)

  6. LONG RANGE HEALTH PLANNING

    Directory of Open Access Journals (Sweden)

    ST. Motameni

    1974-03-01

    Full Text Available In the past, health planning in Iran has been carried out in the context of short-range economic plans. Although this mechanism has helped a great deal in the achievement of certain health plans however, the said scheme has been short in meeting the health objectives on a comprehensive basis. Most often, the heath programs have lost their values to the priority and cost effectiveness of economic plans. A brief review of heath planning in the past shows that the second development plan has been devoted to the establishment of new hospitals on a scattered pattern. The development of a coordinated hospital and health center system has been accepted and partly implemented during the third plan period. In the fourth plan the whole direction has changed towards the de­velopment of private hospitals on profit making basis, and now the fifth plan calls for the regionalized hospital system. Thus, one can say that the past twenty years have been spent to the experimentation of different schemes with­out a real long-range goal. In the past decade the World Health Organization has ventured in the development of health planning principles, but most of the efforts have been devoted to the short-range planning. The long-range health planning is not only a new look to the prin­ciples of planning, but a thorough examination of the time factor in health planning.

  7. Changed planning for planned and unplanned change

    NARCIS (Netherlands)

    Woerkum, van C.; Aarts, N.; Herzele, Van A.

    2011-01-01

    Change, planned and unplanned, can be the product of events (change by chance), new language (change from societal interaction), and practices (track-bound change), and can involve many different societal actors. To position planning as an activity within this broader context, we present a model tha

  8. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  9. BOEM Wind Planning Areas

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set represents the most recent changes for the Wind Development Planning Areas in the Atlantic. Wind Planning Areas in this dataset represent up to six...

  10. Pursuing happiness in planning?

    DEFF Research Database (Denmark)

    Lorentzen, Anne Birte

    2015-01-01

    Experience economic planning. Towards an urban staging system? Vancouver's journey form regional ressource periphery to global metropolis. The chaning cityscape of Vancouver. Values guiding urban planning in Vancouver. Governance of urban transformation in Vancouver. Planners as stagers in Vancou...

  11. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  12. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  13. 1999 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  14. Human Resource Planning

    Science.gov (United States)

    Hoffman, W. H.; Wyatt, L. L.

    1977-01-01

    By using the total resource approach, we have focused attention on the need to integrate human resource planning with other business plans and highlighted the importance of a productivity strategy. (Author)

  15. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  16. Prescriptions and Insurance Plans

    Science.gov (United States)

    MENU Return to Web version Prescriptions and Insurance Plans Prescriptions and Insurance Plans Getting a prescription filled is usually easy. But because of the high cost of prescription medicines, most insurance ...

  17. Understanding health insurance plans

    Science.gov (United States)

    ... medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  18. NSP Action Plans

    Data.gov (United States)

    Department of Housing and Urban Development — NSP Action Plans, also known as Substantial Amendments, contain a description of a grantee’s intended use for NSP funds. The plans contain information on the...

  19. COMET communication plan

    OpenAIRE

    Real, A; Howard, B. J.; Robles, B.; Mora, J. C.; Beresford, N.A.; C. L. Barnett

    2013-01-01

    The Communication Plan for COMET is described. The goals of the Plan are to identify COMET’s various stakeholders and to develop a matrix of communication needs, delivery schedules and metrics of success.

  20. Habitat monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management of habitat is required in order to achieve the refuge purpose and wildlife objectives. The Upland Habitat Management Plan (1993, Interim Plan) and the...

  1. Familiy Planning and Pregnancy

    Science.gov (United States)

    ... Storage Pool Deficiencies Home About Bleeding Disorders Family planning and pregnancy Carriers should receive genetic counselling about ... Diagnosis When to Test for Carrier Status Family Planning and Pregnancy Conception Options Prenatal Diagnosis Fetal Sex ...

  2. Plans Quality Compare

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Plans Quality Data is a publicly available CMS database that contains information on the quality and performance of health plans that offer Medicare Part C and...

  3. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    OpenAIRE

    Humphrey Tonkin

    2015-01-01

    The field of language planning (LP) has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster) suggests that planned languages (what Wüster calls Plansprache) might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, a...

  4. Business plan (tennis school)

    OpenAIRE

    Sirghi, Evgeniya

    2011-01-01

    The main task of this work is to develop a comprehensive business plan for startup sports business that will offer training services. In my final Diploma study I am working on the creation of business plans for the company with a few years vision, I am developing a strategy which takes into account precise construction of finance planning, market penetration and number of employees. The business plan will analyze the current market situation, competition and the probability of company develop...

  5. Business Plan SMEs

    OpenAIRE

    Oppolzerová, Eva

    2009-01-01

    The study presents a business plan for a firm which offers fishing services. The study consist of a theoretical part and a practical part. In the theoretical section the small and medium enterprises are specified, especially the family business and there are characteristics of the form, structure and terms of the business plan. The practical section focuses on elaboration of the business plan for the particular firm. It includes description of all activities, market analysis, financial plan, ...

  6. Disaster Management Plans

    OpenAIRE

    Ikeda, Makoto

    2012-01-01

    Following its devastating experience with recent disasters, Japan has been strengthening or drawing up new disaster management plans at the national and local levels. The Great East Japan Earthquake (GEJE) revealed a number of weaknesses in planning for complex and extraordinary disasters. Central and local governments have been revising their plans to reflect what they learned from the GE...

  7. Sandia Strategic Plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

  8. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social...

  9. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  10. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  11. Tax Planning for Enterprises

    Institute of Scientific and Technical Information of China (English)

    Fan Weiqing

    2011-01-01

    @@ Tax planning is legal planning activities for tax savings, meaning tax payers make operation plans within the national policy framework and choose operation programs favorable to tax savings.Along with a maturing socialist market economy system in China, tax planning is becoming an integral part of enterprise management and operation.For a better tax planning, enterprises have to fully understand the meaning, get proficient at relevant strategies, and apply these methods to save taxes and realize the maximization of enterprise value while considering the actual situation.

  12. Business plans made easy

    CERN Document Server

    Press, Entrepreneur

    2005-01-01

    Business Plans Made Easy, 3rd Edition is the latest incarnation of the essential guide for creating a high-impact business plan that will turn an entrepreneur's dreams into reality. Revised and updated, the book expands the helpful business plan summaries and adds new examples of real-life business plans. Tips about information technology and an added business plan for artists increase the scope of the book. The useful forms, worksheets and financial statements have been updated to reflect recent changes in the business world, and an added "expert advice" section at the end of each chapter giv

  13. Inspection and test planning

    International Nuclear Information System (INIS)

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  14. Transfusion service disaster planning.

    Science.gov (United States)

    Bundy, K L; Foss, M L; Stubbs, J R

    2008-01-01

    The Mayo Clinic, in Rochester, Minnesota, recently set forth a directive to develop a Mayo Emergency Incident Command System (MEICS) plan to respond to major disasters. The MEICS plan that was developed interfaces with national response plans to ensure effective communication and coordination between our institution and local, state, and federal agencies to establish a common language and communication structure. The MEICS plan addresses multiple aspects of dealing with resource needs during a crisis, including the need for blood and transfusion medicine services. The MEICS plan was developed to supplement our current local emergency preparedness procedures and provide a mechanism for responding to the escalating severity of an emergency to deal with situations of a magnitude that is outside the normal experience. A plan was developed to interface the existing Transfusion Medicine disaster plan standard operating procedures (SOP) with the institutional and Department of Laboratory Medicine (DLMP) MEICS plans. The first step in developing this interface was defining MEICS. Other major steps were defining the chain of command, developing a method for visually indicating who is "in charge," planning communication, defining the actions to be taken, assessing resource needs, developing flowcharts and updating SOPs, and developing a blood rationing team to deal with anticipated blood shortages. Several key features of the interface and updated disaster plan that were developed are calling trees for response personnel, plans for relocating leadership to alternative command centers, and action sheets to assist with resource assessment. The action sheets also provide documentation of key actions by response personnel.

  15. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...... and tools. This paper presents an “Interactive Energy Planning” framework, which is intended to support interactivity in planning, building on important theoretical and experimental advances in planning. In particular, the paper explores the potential significance of allowing a critical perspective...... on context analysis and problem-orientation to define the course of the planning process, and deploying value-rational planning tools primarily as a platform for interactivity. The focus on interactivity in energy planning will allow contemporary government planners, consultants, researchers...

  16. On strategic spatial planning

    Directory of Open Access Journals (Sweden)

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  17. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  18. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  19. 40 CFR 265.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure plan; amendment of plan. 265... DISPOSAL FACILITIES Closure and Post-Closure § 265.112 Closure plan; amendment of plan. (a) Written plan... have a written closure plan. Until final closure is completed and certified in accordance with §...

  20. 40 CFR 264.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure plan; amendment of plan. 264... Closure and Post-Closure § 264.112 Closure plan; amendment of plan. (a) Written plan. (1) The owner or operator of a hazardous waste management facility must have a written closure plan. In addition,...

  1. Mission planning for autonomous systems

    Science.gov (United States)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  2. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  3. Business plan competition

    CERN Multimedia

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  4. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  5. Marketing business plan

    OpenAIRE

    Puklová, Michaela

    2013-01-01

    The aim of the thesis is to assemble marketing plan for one chosen market subject, an author, who specializes in sale of automatic technique drawing. The thesis is divided into two essential parts. First part is devoted to theoretical summary of the topic using available literary sources. It focuses on definition of marketing planning as a partial process within complex structure of business activity, furthermore defines particular steps of marketing planning. These steps mainly embrace situa...

  6. IDC Integrated Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  7. Strategic Marketing Planning Audit

    OpenAIRE

    Violeta Radulescu

    2012-01-01

    Market-oriented strategic planning is the process of defining and maintaining a viable relationship between objectives, training of personnel and resources of an organization, on the one hand and market conditions, on the other hand. Strategic marketing planning is an integral part of the strategic planning process of the organization. For successful marketing organization to obtain a competitive advantage, but also to measure the effectiveness of marketing actions the company is required to ...

  8. Reasoning about plans

    CERN Document Server

    Allen, James; Pelavin, Richard; Tenenberg, Josh

    1991-01-01

    This book presents four contributions to planning research within an integrated framework. James Allen offers a survey of his research in the field of temporal reasoning, and then describes a planning system formalized and implemented directly as an inference process in the temporal logic. Starting from the same logic, Henry Kautz develops the first formal specification of the plan recognition process and develops a powerful family of algorithms for plan recognition in complex situations. Richard Pelavin then extends the temporal logic with model operators that allow the representation to

  9. Business Plans For Dummies

    CERN Document Server

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  10. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  11. It's in the Plan.

    Science.gov (United States)

    Bracci, Richard L.

    1999-01-01

    Examines how master planning and participatory process combines to successfully integrate technology into a school's educational system. Discussions on budget setting and environmental design are included. (GR)

  12. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. PMID:22902108

  13. DCOI Strategic Plan

    Data.gov (United States)

    General Services Administration — Under the Data Center Optimization Initiative (DCOI), covered agencies are required to post DCOI Strategic Plans and updates to their FITARA milestones publicly on...

  14. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan.

  15. Tourism in local planning and development : tourist area product and market plans (destination plans)

    OpenAIRE

    Ørjansen, Dag

    1998-01-01

    The main point in the project was to try to find a better framework for the tourism business units own destination planning and try to find a better co-operation with the local planning. By local planning we mean both the traditional long-term development planning, economical planning and short-term development planning.

  16. Guidelines for strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  17. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...

  18. Lesson Plays: Planning Teaching versus Teaching Planning

    Science.gov (United States)

    Zazkis, Rina; Liljedahl, Peter; Sinclair, Nathalie

    2009-01-01

    We introduce Lesson Play as an imaginary interaction between teacher and students presented in a form of a dialogue or play. We suggest that lesson plays are a valuable professional development tool in preparing for teaching that can be juxtaposed with, or used as a replacement for, traditional lesson planning. The article begins with an…

  19. Plan Ecuatoriano de Educacion (Ecuadoran Educational Planning).

    Science.gov (United States)

    Ministerio de Educacion Publica, Quito (Ecuador).

    This book provides background information of the educational system in Ecuador and describes the Ecuadoran plan for educational improvement. The first part considers the general conditions of the country and discusses geographic, economic, social, and demographic aspects along with the educational system. The book discusses the social function of…

  20. Planning Your Retirement.

    Science.gov (United States)

    American Association of Retired Persons, Washington, DC.

    This guidebook on retirement planning helps potential retirees by raising important issues in such areas as changing roles and relationships, health and fitness, meaningful use of time, working options, financial and estate planning, and housing and lifestyle. The first section, on attitude and role adjustments, discusses support systems, changing…

  1. Institutional Long Range Planning.

    Science.gov (United States)

    Caldwell Community Coll. and Technical Inst., Lenoir, NC.

    Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…

  2. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  3. Values Drive the Plan

    Science.gov (United States)

    Cook, Les P.

    2010-01-01

    Values-integrated strategic planning provides the opportunity to clarify professional values as one envisions a future that is exciting and perhaps a bit provocative. This chapter explores the role and importance of student affairs and institutional values in strategic planning. It also looks at the historical roots of the profession and methods…

  4. Automated process planning system

    Science.gov (United States)

    Mann, W.

    1978-01-01

    Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.

  5. Fermilab Program and Plans

    Energy Technology Data Exchange (ETDEWEB)

    Denisov, Dmitri [Fermilab

    2014-01-01

    This article is a short summary of the talk presented at 2014 Instrumentation Conference in Novosibirsk about Fermilab's experimental program and future plans. It includes brief description of the P5 long term planning progressing in US as well as discussion of the future accelerators considered at Fermilab.

  6. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...

  7. Planning in Academic Departments.

    Science.gov (United States)

    Fountoukidis, Dona; And Others

    1995-01-01

    The efforts of the biology department at William Paterson College, a state college in New Jersey, to use strategic planning at the department level are chronicled. Planning focused on establishing a direction for hiring faculty, developing curriculum, purchasing equipment, and training students. Results, unanticipated outcomes, and lessons learned…

  8. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.;

    2010-01-01

    is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  9. Tornado Preparedness Planning.

    Science.gov (United States)

    National Oceanic and Atmospheric Administration (DOC), Rockville, MD. National Weather Service.

    This pamphlet contains a set of guidelines for community leaders interested in developing preparedness plans for tornadoes and severe thunderstorms. Included in the guide is a list of the types of officials and agencies which should be involved in planning meetings. A set of suggestions for developing a community communications network and…

  10. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi;

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  11. Creating a Marketing Plan.

    Science.gov (United States)

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  12. 'Plans are useless'.

    Science.gov (United States)

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve. PMID:24113637

  13. Epistemic and Doxastic Planning

    DEFF Research Database (Denmark)

    Jensen, Martin Holm

    on mathematics and computer science. Planning is the mental capacity that allow us to predict the outcome of our actions, thereby enabling us to exhibit goal-directed behaviour. We often make use of planning when facing new situations, where we cannot rely on entrenched habits, and the capacity to plan......This thesis is concerned with planning and logic, which are both core areas of Artificial Intelligence (AI). A wide range of research disciplines deal with AI, including philosophy, economy, psychology, neuroscience, mathematics and computer science. The approach of this thesis is based...... is therefore closely related to the reflective system of humans. Logic is the study of reasoning. From certain fixed principles logic enables us to make sound and rational inferences, and as such the discpline is virtually impossible to get around when working with AI. The basis of automated planning, the term...

  14. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    2002-01-01

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on ?what is actually...... done?, as opposed to Habermas?s focus on ?what should be done?. We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  15. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on "what is actually...... done", as opposed to Habermas`  focus on "what should be done". We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  16. 'Plans are useless'.

    Science.gov (United States)

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve.

  17. A Plan Is Born

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    China is one of the few countries that formulate a plan pertaining to economic and social development every five years.From ideas to implementation,creating a five-year plan involves many great minds.It’s a complicated,sometimes drawn out process with thorough procedures-and it should be,since each plan plots the course China will take in its social and economic development over the next five years.Professor Hu Angang,Director of the Center for China Study of Tsinghua University,who took part in drawing up the 11th Five-Year Plan (2006-10) and is participating in the ongoing drafting process of the new one,explained the procedures involved in shaping the 12th Five-Year Plan (2011-15) in an exclusive interview with Beijing Review reporters Lan Xinzhen and Yu Shujun.

  18. Complexity Results in Epistemic Planning

    DEFF Research Database (Denmark)

    Bolander, Thomas; Jensen, Martin Holm; Schwarzentruber, Francois

    2015-01-01

    Epistemic planning is a very expressive framework that extends automated planning by the incorporation of dynamic epistemic logic (DEL). We provide complexity results on the plan existence problem for multi-agent planning tasks, focusing on purely epistemic actions with propositional preconditions......-hardness of the plan verification problem, which strengthens previous results on the complexity of DEL model checking....

  19. EMSL Strategic Plan 2008

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-08-15

    This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

  20. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  1. Language Planning Theories and Language Planning In China

    Institute of Scientific and Technical Information of China (English)

    许楠

    2006-01-01

    The specialized study of language policies and planning as a part of sociolinguistics is originated in the 1960's. The theories about language planning may give some guidance to the language planning in China. Of course, China's language policy makers should make decisions according to the specific language situation in China. Chinese language is the national language, and there are more than 120 ethnic minority languages. Therefore, language planning in China involves the Chinese language planning and minority languages planning.

  2. EMSL Contribution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  3. Strategic planning and republicanism

    Directory of Open Access Journals (Sweden)

    Mazza Luigi

    2010-01-01

    Full Text Available The paper develops two main linked themes: (i strategic planning reveals in practice limits that are hard to overcome; (ii a complete planning system is efficacy only in the framework of a republican political, social and government culture. It is argued that the growing disappointment associated to strategic planning practices, may be due to excessive expectations, and the difficulties encountered by strategic planning are traced to three main issues: (a the relationship between politics and planning; (b the relationship between government and governance; and (c the relationship between space and socioeconomic development. Some authors recently supported an idea of development as consisting in the qualitative evolution of forms of social rationality and argued that a reflection about the relationships between physical transformations and visions of development could be a way of testing innovations. But such strong demands might be satisfied only if we manage to make a 'new social and territorial pact for development', recreating a social fabric imbued with shared values. The re-creation of a social fabric imbued with shared values requires a rich conception of the political community and the possibility that the moral purposes of the community may be incorporated by the state. All this is missing today. Outside a republican scheme planning activities are principally instruments for legitimising vested interests and facilitating their investments, and the resolution of the conflicts that arise between the planning decisions of the various levels of government becomes at least impracticable. A complete planning system can be practised if can be referred to the authority and syntheses expressed in and by statehood, which suggests that in a democratic system planning is republican by necessity rather than by choice.

  4. Environmental monitoring plan

    International Nuclear Information System (INIS)

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  5. Assembly plans for ITER

    International Nuclear Information System (INIS)

    The assembly of ITER represents an extrapolation of a factor of two or more in size over existing large tokamaks. An assembly plan has been developed based on the ITER Outline Design. This plan was reviewed by technical experts and critical issues were identified. Alternate designs are being developed to address the most serious concerns and to minimize cost and assembly schedule. Because ITER has many characteristics of a full-scale nuclear reactor its assembly has challenges not faced previously by the fusion community. Careful assembly planning and well-designed tooling are required to insure success in the assembly of ITER

  6. Environmental monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  7. Heat pump planning handbook

    CERN Document Server

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  8. Business Plan: Elpis Restaurant

    OpenAIRE

    Tran, Luu Quoc Phong

    2016-01-01

    The purpose of this Bachelor’s thesis is to create a business plan for starting up a restaurant in European – Asian style in Helsinki. While the restaurants are in European or Asian style separately, this restaurant will be unique with dishes which are based on local traditional dishes, traditional Asian dishes and mixture between them as well as creation of new dishes. This business plan is created to minimize the risk when starting up a restaurant. The plan will not only help the restaur...

  9. Undecidability in Epistemic Planning

    DEFF Research Database (Denmark)

    Aucher, Guillaume; Bolander, Thomas

    2013-01-01

    Dynamic epistemic logic (DEL) provides a very expressive framework for multi-agent planning that can deal with nondeterminism, partial observability, sensing actions, and arbitrary nesting of beliefs about other agents’ beliefs. However, as we show in this paper, this expressiveness comes...... at a price. The planning framework is undecidable, even if we allow only purely epistemic actions (actions that change only beliefs, not ontic facts). Undecidability holds already in the S5 setting with at least 2 agents, and even with 1 agent in S4. It shows that multi-agent planning is robustly undecidable...

  10. Marketing plan business

    OpenAIRE

    Beková, Martina

    2014-01-01

    The aim of the present thesis is the marketing plan of a new Czech-French Restaurant Montmartre in Pilsen. The work is divided into two parts, a theoretical part and a practical part. The theoretical part, which provides the basis for an elaboration of a marketing plan, is a review of literature. It is divided into two chapters. The first chapter defines the concept of marketing and its meaning; the second chapter focuses on the marketing plan, starting at the definition of the different type...

  11. Single-employer pension plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active single-employer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  12. Probabilistic transmission system planning

    CERN Document Server

    Li, Wenyuan

    2011-01-01

    "The book is composed of 12 chapters and three appendices, and can be divided into four parts. The first part includes Chapters 2 to 7, which discuss the concepts, models, methods and data in probabilistic transmission planning. The second part, Chapters 8 to 11, addresses four essential issues in probabilistic transmission planning applications using actual utility systems as examples. Chapter 12, as the third part, focuses on a special issue, i.e. how to deal with uncertainty of data in probabilistic transmission planning. The fourth part consists of three appendices, which provide the basic knowledge in mathematics for probabilistic planning. Please refer to the attached table of contents which is given in a very detailed manner"--

  13. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  14. My Reproductive Life Plan

    Science.gov (United States)

    ... write their plan down on a piece of paper or in a journal. Be sure to talk ... your email address: Enter Email Address What's this? Submit What's this? Submit Button Information For... Media Policy ...

  15. Succeeding with succession planning.

    Science.gov (United States)

    McConnell, C R

    1996-12-01

    Succession planning is the process of identifying people who could presently move into key positions or could do so after specifically targeted development occurs. The process identifies the better people in the organization and takes a consistent approach to assembling, analyzing, and retaining information about potential leaders and planning for their further development. At its simplest level, it is the development of a backup and potential successor to each manager; at is most formal, it is a documented plan for management succession at all levels in the organization. Strongly supportive of a policy of development and promotion from within the organization, succession planning also represents a proactive posture in respect to inevitable management turnover. In these days of rapid change in health care, no modern organization that expects to keep up with increasing competition can afford to drift--or even to let a single department drift--while replacements are recruited for managers who resign, retire, or otherwise leave.

  16. Medicare Advantage Plans

    Science.gov (United States)

    ... plans Ways to pay Part A & Part B premiums Costs at a glance What Medicare Covers Is ... File a complaint Identity theft: protect yourself Phone numbers & websites Privacy practices Contact Medicare The page could ...

  17. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  18. Planning for older workers.

    Science.gov (United States)

    Randolph, Susan A

    2013-12-01

    Occupational and environmental health nurses can improve planning for an aging workforce by reviewing existing programs and services and adding aging and multi-generational workforce issues to ongoing training. PMID:24328920

  19. Elective course planning

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  20. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  1. Facility Response Plan (FRP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  2. Law Enforcement Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Law Enforcement Plan clarifies U.S. Fish and Wildlife enforcement policies as they apply to the Refuge. It provides...

  3. Land Use Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan discusses the main types of land use at Parker River National Wildlife Refuge. Information about geology and water, groundwater, climatic conditions,...

  4. Project Planning: An Analysis

    Directory of Open Access Journals (Sweden)

    Dr.S.S.Riaz Ahamed

    2010-01-01

    Full Text Available The purpose of the Planning stage is to analyze the project in terms of work breakdown, cost, resources, and timing. At the end of this stage all team members should be clear on the sub tasks and deliverables with the project, the time constraints they are working too and the roles and responsibilities that are expected from them.Software Project Plan defines what the work is, and how this work can be completed. This plan is developed at the beginning of the software project and is continually refined and improved as the work rocesses. It can be useful to management as a frame work for review and control the process of developing the software. Additionally, the Software Project Plan can define each of the major tasks and estimate the time and resources that are required to complete these tasks.

  5. Crowd Control Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Crowd Control Plan for Swan Lake National Wildlife Refuge outlines operational procedures in the event of a civil disorder on the Refuge. An inventory of...

  6. Planning a Science Fair

    Science.gov (United States)

    Ebert, Jim

    1976-01-01

    Presented are views, on planning science fairs and science fair projects, of a fair coordinator, a science teacher, and students. Also included are 25 questions which might result in science fair projects. (SL)

  7. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  8. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  9. Tulare Basin protection plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tulare Basin Protection Plan has been initiated by The Nature Conservancy to elucidate the problems and opportunities of natural diversity protection....

  10. Frenchglen Interpretive Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this interpretive plan is to provide guidance for the development of the interpretive exhibits for the Frenchglen Interpretive Center, as well as the...

  11. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  12. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  13. Network planning under uncertainties

    Science.gov (United States)

    Ho, Kwok Shing; Cheung, Kwok Wai

    2008-11-01

    One of the main focuses for network planning is on the optimization of network resources required to build a network under certain traffic demand projection. Traditionally, the inputs to this type of network planning problems are treated as deterministic. In reality, the varying traffic requirements and fluctuations in network resources can cause uncertainties in the decision models. The failure to include the uncertainties in the network design process can severely affect the feasibility and economics of the network. Therefore, it is essential to find a solution that can be insensitive to the uncertain conditions during the network planning process. As early as in the 1960's, a network planning problem with varying traffic requirements over time had been studied. Up to now, this kind of network planning problems is still being active researched, especially for the VPN network design. Another kind of network planning problems under uncertainties that has been studied actively in the past decade addresses the fluctuations in network resources. One such hotly pursued research topic is survivable network planning. It considers the design of a network under uncertainties brought by the fluctuations in topology to meet the requirement that the network remains intact up to a certain number of faults occurring anywhere in the network. Recently, the authors proposed a new planning methodology called Generalized Survivable Network that tackles the network design problem under both varying traffic requirements and fluctuations of topology. Although all the above network planning problems handle various kinds of uncertainties, it is hard to find a generic framework under more general uncertainty conditions that allows a more systematic way to solve the problems. With a unified framework, the seemingly diverse models and algorithms can be intimately related and possibly more insights and improvements can be brought out for solving the problem. This motivates us to seek a

  14. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  15. Approximations in Inspection Planning

    DEFF Research Database (Denmark)

    Engelund, S.; Sørensen, John Dalsgaard; Faber, M. H.;

    2000-01-01

    Planning of inspections of civil engineering structures may be performed within the framework of Bayesian decision analysis. The effort involved in a full Bayesian decision analysis is relatively large. Therefore, the actual inspection planning is usually performed using a number of approximations....... One of the more important of these approximations is the assumption that all inspections will reveal no defects. Using this approximation the optimal inspection plan may be determined on the basis of conditional probabilities, i.e. the probability of failure given no defects have been found...... by the inspection. In this paper the quality of this approximation is investigated. The inspection planning is formulated both as a full Bayesian decision problem and on the basis of the assumption that the inspection will reveal no defects....

  16. MyPlan

    Data.gov (United States)

    California Department of Resources — MyPlan is a map service designed to be a simple interface to California natural hazard data products produced by the California Natural Resources Agency departments...

  17. Climate plan 2004

    International Nuclear Information System (INIS)

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  18. Waterfowl disease contingency plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this contingency plan is reduce waterfowl losses from disease, primarily avian botulism, along the eastern shore of the Great Salt Lake in Utah. This...

  19. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  20. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning...... and strategic renewal. Empirical evidence of the various difficulties that learning flows has to overcome as it journeys through organizational and hierarchical levels are presented. Despite various cognitive and social psychological barriers identified along the way, the results show the novel...

  1. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  2. Postpartum Depression Action Plan

    Science.gov (United States)

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to feel ...

  3. Strategic marketing planning

    OpenAIRE

    Plechatý, Josef

    2014-01-01

    The object of this dissertation is to verify the business plan viability as well as its chances for competitive market and branch attractiveness. The business plan consist a creation of web page through which a service called “car pool” is realized. The goal is to catch up as many registered users as possible and to create great basis of potential clients for the advert submitter using the most exact aim. Customers ordering the advertisement are representing revenue of subject....

  4. El plan piloto 1997

    Directory of Open Access Journals (Sweden)

    Fernando Martínez Sandres

    2015-09-01

    Full Text Available Contenido: El proceso de gestación. El primer acercamiento. Las elaboraciones del grupo de trabajo. El segundo escalón. Las ideas llevadas a un proyecto. Hacia una iniciativa integral. La re-programación del proyecto. Las actividades en marcha. El plan piloto1997 funcionando. Los próximos pasos del plan. Recoger, sistematizar y analizar. El escenario futuro. Procurar que los esfuerzos den sus frutos

  5. DOREMI - Dissemination Plan

    OpenAIRE

    Lupi??ez-Villanueva, Francisco; Vozzi, Federico; Rial, Michela; Morales, Aurora; Parodi, Oberdan; Ferro, Erina; Fortunati, Luigi; Palumbo, Filippo

    2014-01-01

    The deliverable D7.1 "Dissemination plan" aims at formulating the project's dissemination strategy and plan, identifying the specific approaches best suited for contact and interaction with target groups, considering both new (e.g. internet exploitation; cross-posting, cycling references, etc.) and traditional (e.g. press release, newsletters, conferences, etc.) dissemination avenues. The report starts with the identification of the key stakeholders of the projects and the main dissemination ...

  6. Cassini science planning process

    Science.gov (United States)

    Paczkowski, Brian G.; Ray, Trina L.

    2004-01-01

    The mission design for Cassini-Huygens calls for a four-year orbital survey of the Saturnian system and the descent into the Titan atmosphere and eventual soft-landing of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 44 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that will perform a wide range of observations on a multitude of designated targets. The science opportunities, frequency of encounters, the length of the Tour, and the use of distributed operations pose significant challenges for developing the science plan for the orbiter mission. The Cassini Science Planning Process is the process used to develop and integrate the science and engineering plan that incorporates an acceptable level of science required to meet the primary mission objectives far the orbiter. The bulk of the integrated science and engineering plan will be developed prior to Saturn Orbit Insertion (Sol). The Science Planning Process consists of three elements: 1) the creation of the Tour Atlas, which identifies the science opportunities in the tour, 2) the development of the Science Operations Plan (SOP), which is the conflict-free timeline of all science observations and engineering activities, a constraint-checked spacecraft pointing profile, and data volume allocations to the science instruments, and 3) an Aftermarket and SOP Update process, which is used to update the SOP while in tour with the latest information on spacecraft performance, science opportunities, and ephemerides. This paper will discuss the various elements of the Science Planning Process used on the Cassini Mission to integrate, implement, and adapt the science and engineering activity plans for Tour.

  7. Environmental implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  8. Overview about project planning

    OpenAIRE

    Catalin Drob

    2012-01-01

    The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide) developed by the Project Management Institute (PMI) in 2008. According to this edition of PMBOK, project planning involves a group of processes required to establish the scope of the project, refine the objectives, and define the actions that must be undertaken to attain the objectives ...

  9. Energy and urban planning

    OpenAIRE

    Fertner, Christian

    2015-01-01

    How can spatial planning reduce energy use in our cities? How do differentgeographical, regional, cultural or political contexts influence our options? Howcan we measure and monitor its effects? And where do we set the boundaries forthe definition of action and goals? Findings from the international EU-FP7 projectPLEEC (‘Planning for energy efficient cities’, 2013-2016) and spin-off projects listoptions and challenges.

  10. Environmental implementation plan

    International Nuclear Information System (INIS)

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  11. A Plan Is Born

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ Ten steps The first step in making the 12th FiveYear Plan was a midterm review of the 11th Five-Year Plan. In the second half of 2008, the National Development and Reform Commission (NDRC) entrusted the Center for China Study of Tsinghua University, the Development Research Center of the State Council and the World Bank Office, Beijing with the review work. Each of the three then wrote an independent report.

  12. A Good Plan

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    Now I am a middle school student,and I have some experience on study.I think a good plan is the most important. In the middle school,there are a lot of things to do every day.So you must have a plan to help you do all the things,or you will be very busy and can't do things well.

  13. Human Resource Planning

    OpenAIRE

    Lache Cãtãlina

    2011-01-01

    The objective of human resource planning is to adapt the human capital needed to develop the enterprises’ activities and to accomplish their priority objectives on the medium and/or short term. Human resource planning is a dynamic activity, time being an essential variable, both in what regards the quantitative side (adapting the number of jobs according to the organisation’s evolution in time) and the qualitative side (harmonising the jobs’ complexity with technological changes). The quantit...

  14. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  15. Community energy planning

    Energy Technology Data Exchange (ETDEWEB)

    Rees, S. [BC Energy Aware Committee, Richmond, BC (Canada)

    2001-07-01

    The mandate of the BC Energy Aware Committee is to promote and assist in the implementation of community energy planning by working with local governments, developers and utilities to integrate energy into local planning processes and to use local resources in the design and operation of communities. This paper presented the basic concepts of how energy is used in communities and how its use impacts the community. It was demonstrated that designing for energy supports community livability objectives. Energy considerations can be incorporated in existing community planning processes, thereby playing an important role in reducing Canada's greenhouse gas emissions and slowing down climate change. The paper also provided some practical advice that will help communities move toward sustainable energy development. Community energy planning encompasses land use planning and transportation, infrastructure efficiency, and alternative energy supply. The strategies that are related to each of these components were highlighted. The community energy planning program in Kamloops was presented as a case study of a specific initiative to build a community that is socially, environmentally and fiscally sustainable. tabs., figs.

  16. Strategic planning for marketers.

    Science.gov (United States)

    Wilson, I

    1978-12-01

    The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.

  17. Developing a Professionalism Plan

    Directory of Open Access Journals (Sweden)

    Heather Pautler, PharmD

    2013-01-01

    Full Text Available Professionalism is a way of being which underlies all the responsibilities of a pharmacist and associated general and professional abilities. The Student Affairs Committee was charged with developing a college-wide professionalism plan to meet the Accreditation Council for Pharmacy Education (ACPE Standards 15.1 and 23. This plan was developed concurrently with a new curriculum. The plan was developed systematically with the following goals: 1 create a definition of professionalism, 2 determine outcomes of the plan, 3 identify existing components which should be continued and new components to be added, 4 ensure existing and new components are linked to outcomes and 5 develop a continuous assessment process for the plan. The proposed plan consists of curricular, co-curricular and extra-curricular activities designed to help students gain experience in three professionalism pillars: Competence, Connection and Character, as defined by Brown et al in “Taxonomy of Professionalism”. While knowledge and skills will be enhanced, the focus of development will be on student virtues, values and attitudes—that what they do defines who they are. The goal is to help students develop as people and professionals who value the high ideals expected of a pharmacist.

  18. Rulison Monitoring Plan

    International Nuclear Information System (INIS)

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides

  19. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  20. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  1. Differentiating Bona Fide Strategic Planning from Other Planning.

    Science.gov (United States)

    Meredith, Mark; And Others

    The extent to which a college has been engaged in strategic planning was studied with a sample of 96 institutions which had been identified as using strategic planning in a 1985 study. Survey questions consisted of a mixture of: (1) activities proper and essential to strategic planning; and (2) approaches and views of strategic planning that have…

  2. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  3. Bioclimate and city planning - open space planning

    Science.gov (United States)

    Mertens, Elke

    The planning and using of open spaces in urban areas very much depend on the shading of the surrounding building structures. This article presents a method for the investigation of the sunlight and the bioclimatic conditions in dependence on the surrounding buildings. It is illustrated for typical courtyards in Berlin, Germany, as one type of open spaces. The programme HelioDat determines the shading of any spot of an open space. It gives the possible duration of direct sunlight for the selected spot for each day of the year. The sunlight conditions in the courtyards differ from one another a lot in dependence on their size the tallness of the surrounding buildings. The calculation of the PMV on the basis of the results of the programme HelioDat determine the bioclimatic situation in the discussed courtyards. Although the results of HelioDat are only one input among the weather conditions and the personal characteristics of the test-person, the bioclimatic conditions correlate very much with the sunlight conditions. In a projected building structure, the sunlight conditions vary a lot between the present situation and the two architectural alternatives. Since the bioclimatic situation is correlated to the sunlight conditions, this example demonstrates the importance for the investigation of the sunlight conditions and the bioclimate already during the planning process of buildings.

  4. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  5. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  6. Nutritional plans for boars

    Directory of Open Access Journals (Sweden)

    Charles Kiefer

    2012-06-01

    Full Text Available The objective of the present study was to evaluate nutritional plans for boars. Four hundred animals of 67 to 135 days of age and initial weight of 27.75±1.61 kg were distributed in a randomized block design with seven nutritional plans for boars (9.0-8.0; 9.0-9.0; 10.0-9.0; 10.0-10.0; 11.0-10.0; 11.0-11.0 and 12.0-11.0 g/kg of digestible lysine from 67 to 107 days and from 108 to 135 days, respectively with four repetitions and a control plan for barrows (11.0-10.0 g/kg of digestible lysine with eight repetitions and ten animals each. Uncastrated male swine presented better feed conversion; however they showed a lower marbling degree in relation to barrows, regardless of the nutritional plan. The nutritional plan that corresponds to the sequence of 11.0-10.0 g/kg of digestible lysine from the 67 to the 107 days and from the 108 to the 135 days, respectively, meets the nutritional needs of boars.

  7. Piping research program plan

    International Nuclear Information System (INIS)

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  8. Draft Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

  9. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  10. Effective Implementation of Urban Planning

    Institute of Scientific and Technical Information of China (English)

    WANG Xun-guo

    2002-01-01

    We analyze the factors that affect the efficiency and function of city planning in practical implementation,especially those of detailed planning. Two key principles and three strategies for plan to reach effective implementation are discussed so that the inflexibility and non- effectiveness of plans can be lessened.

  11. Mathematical models for planning support

    NARCIS (Netherlands)

    L.G. Kroon (Leo); R.A. Zuidwijk (Rob)

    2003-01-01

    textabstractIn this paper we describe how computer systems can provide planners with active planning support, when these planners are carrying out their daily planning activities. This means that computer systems actively participate in the planning process by automatically generating plans or parti

  12. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  13. Program Implementation Plan

    International Nuclear Information System (INIS)

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  14. Energy and urban planning

    DEFF Research Database (Denmark)

    Fertner, Christian

    How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from the interna......How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from...... the international EU-FP7 project PLEEC (‘Planning for energy efficient cities’, 2013-2016) and spin-off projects list options and challenges....

  15. Fra Plan til Undervisning

    DEFF Research Database (Denmark)

    Ingerslev, Gitte Holten; Svejgaard, Karin; Madsen, Anne-Grethe

    Fra plan til undervisningspraksis ? en evaluering af fagligt samspil Resumé: Fra plan til undervisning er en rapport fra et evalueringsprojekt finansieret af undervisningsministeriets midler til udviklingsarbejde og forsøg på de gymnasiale uddannelser. Projektet er gennemført af et konsortium...... fremstilles i rapporten Fra plan til Undervisning som tre cases. Casene indeholder en del fællestræk, da skolernes arbejde med fagligt samspil udspringer af en række fælles erfaringer og træk ved undervisningskulturen på htx. Det gælder først og fremmest det forhold, at fagligt samspil knyttes sammen med de...

  16. Recertification Project Plan

    International Nuclear Information System (INIS)

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  17. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  18. Planning as situated design

    DEFF Research Database (Denmark)

    Axel, Erik

    they have to decide who among us does what with what to achieve this. It will be argued that this process contains moral and political aspects, as well as aspects of privilege, and that these aspects as well as the organising of planning takes shape from concrete conditions. It will be argued that even...... into any conceivable detail of the house to be built, still, unanticipated conditions appear during the whole process which must be taken into account. The planning is therefore not a realization of an idea, but a political development in the material and practical existence of the house....... understanding of theoretical thinking. Some material from the empirical research project developed with Klaus Nielsen on the design and engineering of a house will be presented. On this basis a conception of planning will be unfolded. It will be understood differently from the way it is understood...

  19. Tourism and Strategic Planning

    DEFF Research Database (Denmark)

    Pasgaard, Jens Christian

    2012-01-01

    The main purpose of this report is to explore and unfold the complexity of the tourism phenomenon in order to qualify the general discussion of tourism-related planning challenges. Throughout the report I aim to demonstrate the strategic potential of tourism in a wider sense and more specifically...... the potential of ‘the extraordinary’ tourism-dominated space. As highlighted in the introduction, this report does not present any systematic analysis of strategic planning processes; neither does it provide any unequivocal conclusions. Rather, the report presents a collection of so-called ‘detours......’ – a collection of theoretical discussions and case studies with the aim to inspire future strategic planning. Due to the complexity and heterogeneity of the phenomenon I use a non-linear and non-chronological report format with the ambition to create a new type of overview. In this regard the report is intended...

  20. Planning in subsumption architectures

    Science.gov (United States)

    Chalfant, Eugene C.

    1994-01-01

    A subsumption planner using a parallel distributed computational paradigm based on the subsumption architecture for control of real-world capable robots is described. Virtual sensor state space is used as a planning tool to visualize the robot's anticipated effect on its environment. Decision sequences are generated based on the environmental situation expected at the time the robot must commit to a decision. Between decision points, the robot performs in a preprogrammed manner. A rudimentary, domain-specific partial world model contains enough information to extrapolate the end results of the rote behavior between decision points. A collective network of predictors operates in parallel with the reactive network forming a recurrrent network which generates plans as a hierarchy. Details of a plan segment are generated only when its execution is imminent. The use of the subsumption planner is demonstrated by a simple maze navigation problem.

  1. Optics Supply Planning System

    Energy Technology Data Exchange (ETDEWEB)

    Gaylord, J

    2009-04-30

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  2. Fractional factorial plans

    CERN Document Server

    Dey, Aloke

    2009-01-01

    A one-stop reference to fractional factorials and related orthogonal arrays.Presenting one of the most dynamic areas of statistical research, this book offers a systematic, rigorous, and up-to-date treatment of fractional factorial designs and related combinatorial mathematics. Leading statisticians Aloke Dey and Rahul Mukerjee consolidate vast amounts of material from the professional literature--expertly weaving fractional replication, orthogonal arrays, and optimality aspects. They develop the basic theory of fractional factorials using the calculus of factorial arrangements, thereby providing a unified approach to the study of fractional factorial plans. An indispensable guide for statisticians in research and industry as well as for graduate students, Fractional Factorial Plans features: * Construction procedures of symmetric and asymmetric orthogonal arrays. * Many up-to-date research results on nonexistence. * A chapter on optimal fractional factorials not based on orthogonal arrays. * Trend-free plans...

  3. Automatic planning of head and neck treatment plans.

    Science.gov (United States)

    Hazell, Irene; Bzdusek, Karl; Kumar, Prashant; Hansen, Christian R; Bertelsen, Anders; Eriksen, Jesper G; Johansen, Jørgen; Brink, Carsten

    2016-01-01

    Treatment planning is time-consuming and the outcome depends on the person performing the optimization. A system that automates treatment planning could potentially reduce the manual time required for optimization and could also provide a method to reduce the variation between persons performing radiation dose planning (dosimetrist) and potentially improve the overall plan quality. This study evaluates the performance of the Auto-Planning module that has recently become clinically available in the Pinnacle3 radiation therapy treatment planning system. Twenty-six clinically delivered head and neck treatment plans were reoptimized with the Auto-Planning module. Comparison of the two types of treatment plans were performed using DVH metrics and a blinded clinical evaluation by two senior radiation oncologists using a scale from one to six. Both evaluations investigated dose coverage of target and dose to healthy tissues. Auto-Planning was able to produce clinically acceptable treatment plans in all 26 cases. Target coverages in the two types of plans were similar, but automatically generated plans had less irradiation of healthy tissue. In 94% of the evaluations, the autoplans scored at least as high as the previously delivered clinical plans. For all patients, the Auto-Planning tool produced clinically acceptable head and neck treatment plans without any manual intervention, except for the initial target and OAR delineations. The main benefit of the method is the likely improvement in the overall treatment quality since consistent, high-quality plans are generated which even can be further optimized, if necessary. This makes it possible for the dosimetrist to focus more time on difficult dose planning goals and to spend less time on the more tedious parts of the planning process.

  4. Marketing plan for a restaurant

    OpenAIRE

    Appelroth, Erica

    2015-01-01

    The aim of this bachelor's thesis was to create a marketing plan for Dream Hostel & Hotel's upcoming restaurant. Dream Hostel & Hotel has not created a marketing plan for the restaurant before. The thesis was commissioned by the company and the objectives for the marketing plan were decided by using information received from the representative of the company. The main idea behind this marketing plan was to create a plan for gaining visibility for the restaurant before its opening day. The...

  5. Human-scientific Planning Theory

    OpenAIRE

    Hagen, Aksel

    1998-01-01

    This working report is a paper written to XII AESOP Congress 22 – 25 July 1998, Aveiro, Portugal. It is a presentation of human-scientific action theory and its linkage to planning, both planning theory and planning practice. Human-scientific action theory is created by professor Gunnar Olsson and professor José Luis Ramírez, Nordic School of Planning, Stockholm. Planning is primarily a practical and reflective activity. The notion ”Planning” may, therefore, describe the activi...

  6. Marketing plan of company

    OpenAIRE

    Bartoš, Lukáš

    2011-01-01

    The topic of the thesis is the formulation of a marketing plan for a small firm, CHICkočárky, which sells baby products. This work should help the company improve its performance on the current local markets. The first part of the thesis includes an overview of the basic marketing concepts and of the most frequently used tools according to renowned experts like e.g. Philip Kotler and Miroslav Foret. This part explains the following marketing terms – marketing, marketing plan, situation analys...

  7. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka;

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...... and supply uncertainty were identified as particularly critical for the S&OP process. It was found that there is a great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites for a stable production process....

  8. The AB Staff Plan

    CERN Document Server

    Boillot, J; Delahaye, J P; Myers, S; CERN. Geneva. AB Department

    2003-01-01

    The present report summarises the staff plan of the newly created Accelerators and Beams (AB) Division following the restructuring of the Accelerator Sector and covering the period 2003 to 2010. It underlines the refocusing of the staff on priority work, especially the LHC Project and is coherent with the recently adopted CERN Long Term Plan (LTP). It compares the requested and available manpower (both staff and industrial support) for each Project, Programme and Activity (PPA) split in work packages and highlights the missing manpower for each category of personnel.

  9. Voting over economic plans

    OpenAIRE

    Boylan, Richard T; RICHARD D. MCKELVEY

    1995-01-01

    We review and provide motivation for a one-sector model of economic growth in which decisions about capital accumulation are made by a political process. If it is possible to commit for at least three periods into the future, then for any feasible consumption plan, there is a perturbation that is majority-preferred to it. Furthermore, plans that minimize the maximum vote that can be obtained against them yield a political business cycle. If it is impossible to commit, voters select the optima...

  10. Marketing plan for Diyue

    OpenAIRE

    Wang, Jiao

    2011-01-01

    The purpose of this thesis was to study marketing planning process from a case com-pany perspective. The thesis was done for the case company Diyue which is a new started 4S car shop located in the newly completed Auto Parts City in Baigou-a town of China. Diyue wanted to have a better and steady growth in the new market, the provided marketing plan would help the entrepreneurs of the Diyue to make the achievable objectives, right strategy, and efficient marketing mix to offer service and pro...

  11. Planned place of birth

    DEFF Research Database (Denmark)

    Overgaard, Charlotte; Coxon, Kirstie; Stewart, Mary

    Title Planned place of birth: issues of choice, access and equity. Outline In Northern European countries, giving birth is generally safe for healthy women with uncomplicated pregnancies, and their babies. However, place of birth can affect women’s outcomes and experiences of birth. Whilst tertiary...... in Denmark Coxon K et al: Planned place of birth in England: perceptions of accessing obstetric units, midwife led units and home birth amongst women and their partners. How these papers interrelate These papers draw upon recent research in maternity care, undertaken in Denmark and in England. In both...

  12. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  13. Guam Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  14. Overview about project planning

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2012-12-01

    Full Text Available The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide developed by the Project Management Institute (PMI in 2008. According to this edition of PMBOK, project planning involves a group of processes required to establish the scope of the project, refine the objectives, and define the actions that must be undertaken to attain the objectives of the project.

  15. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  16. Corporate plan 1989

    International Nuclear Information System (INIS)

    The paper presents the United Kingdom Science and Engineering Research Council's second Corporate Plan 1989. The Corporate Plan comprises statements of the current objectives of the Astronomy and Planetary Science Board, the Engineering Board, the Nuclear Physics Board, the Atmospheric Sciences and Computing Centre, along with a discussion of the mechanisms for their attainment. The Annex contains a description of some scientific highlights between 1985-1989, as well as a review of progress between 1984-5 to 1987-8. (U.K.)

  17. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka;

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...... product development, customer service levels, and supply uncertainty, were identified as particularly critical for the S&OP process. It was found that there is great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites...... for a stable production process....

  18. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  19. Aspects of Inspection Planning

    DEFF Research Database (Denmark)

    Faber, M. H.; Sørensen, John Dalsgaard

    2000-01-01

    Inspection planning for systems is considered with special emphasis to the effect of the quality of inspections on the system reliability and the probability of repair. Inspection quality is described and discussed in terms of inspection reliability and inspection coverage where the latter is set...... in relation to the correlation between the failure modes of the considered system. The inspection planning problem is described in general terms taking basis in the Bayesian decision theory. Practical applicable approaches are derived from the more general but also more involving formulations. The theoretical...

  20. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  1. Marketing Plan: Tukkanuotta Rauma

    OpenAIRE

    Hyrsky, Antti

    2012-01-01

    The purpose of this thesis was to make a marketing plan and a brand new website for a hair saloon. The marketing plan is based on the 7p’s of the extended or service marketing mix. The emphasis is on the parts of promotion and price. The thesis outlines the theory of marketing mix and applies it to the case. The second part of the thesis is a new website. The website was done using Joomla! 1.7 content management system. This platform was selected in order to make future updating and m...

  2. Automatic planning of head and neck treatment plans

    DEFF Research Database (Denmark)

    Hazell, Irene; Bzdusek, Karl; Kumar, Prashant;

    2016-01-01

    qual-ity since consistent, high-quality plans are generated which even can be further optimized, if necessary. This makes it possible for the dosimetrist to focus more time on difficult dose planning goals and to spend less time on the more tedious parts of the planning process.......Treatment planning is time-consuming and the outcome depends on the person performing the optimization. A system that automates treatment planning could potentially reduce the manual time required for optimization and could also pro-vide a method to reduce the variation between persons performing...... radiation dose planning (dosimetrist) and potentially improve the overall plan quality. This study evaluates the performance of the Auto-Planning module that has recently become clinically available in the Pinnacle3 radiation therapy treatment planning system. Twenty-six clinically delivered head and neck...

  3. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  4. Territorial energy planning

    International Nuclear Information System (INIS)

    Energy planning is a tool for action in the hands of the Public Administrations recognized of the utmost importance to actively involve local communities in the path towards sustainability energy, through the programming of local actions that improve energy efficiency, increase the use of renewable sources, stimulate savings energy and the rational use of energy.

  5. Dracula. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Bram Stoker's novel "Dracula," this lesson plan presents activities designed to help students understand that some fictional literary characters become so famous that they enter popular culture in other forms (movies, games, toys); and that working on a product such as a game often demands collaborative effort. The main activity of the…

  6. A Planning Palimpsest

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay; Gutzon Larsen, Henrik; Olesen, Kristian

    2015-01-01

    demonstrates how transformations of Danish spatial planning discourses and practices must be understood in context of previous discourses and practices sedimented as layers of meaning and materiality through time and over space. These layers do not completely overlay one another, but present a palimpsest...

  7. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  8. Ben Franklin. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Benjamin Franklin's "Poor Richard's Almanac," this lesson plan presents activities designed to help students understand that Ben Franklin is known, among other things, for his wit and wisdom; that Franklin published an almanac for 25 years; and he scattered aphorisms throughout the almanac. The main activity in the lesson is for students…

  9. "Frankenstein." [Lesson Plan].

    Science.gov (United States)

    Simon, Melanie

    Based on Mary Shelley's novel "Frankenstein," this lesson plan presents activities designed to help students understand that active readers interpret a novel (its characters, plot, setting, and theme) in different ways; and the great literature can be and has been adapted in many ways over time. The main activity of the lesson involves students…

  10. Clarence Cannon Sign Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon Sign Plan explains how signs are used on the Refuge to help guide and educate visitors. An inventory of current signs is given as well as a list...

  11. Planning with Reachable Distances

    KAUST Repository

    Tang, Xinyu

    2009-01-01

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the robot\\'s number of degrees of freedom. In addition to supporting efficient sampling, we show that the RD-space formulation naturally supports planning, and in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1000 links in time comparable to open chain sampling, and we can generate samples for 1000-link multi-loop systems of varying topology in less than a second. © 2009 Springer-Verlag.

  12. Ecological planning: A review

    Science.gov (United States)

    Steiner, Frederick; Brooks, Kenneth

    1981-11-01

    Beginning with the passage of the National Environmental Policy Act in 1969, the federal government of the United States has enacted numerous pieces of legislation intended to protect or conserve the environment. Other national governments have also enacted environmental legislation during the past two decades. State and local governments have also adopted policies concerned with environmental planning and management. Multiple laws and overlapping governmental agency responsibilities have confused development and resource management efforts. A comprehensive methodology that integrates the legal mandates and the agency missions into a common and unified framework is needed. Ecological planning offers such a method. Application of the method allows planners and resource managers to better understand the nature and character of the land and/or resource and therefore make better decisions about its appropriate use or management. The steps taken in an ecological planning process—1) goal setting, 2) inventory and analysis of data, 3) suitability analysis, 4) developing alternatives, 5) implementation, 6) administration, and 7) evaluation—are outlined and explained. Hand-drawn overlays and computer programs as techniques for handling ecological planning information are compared. Observations and suggestions for further research are offered.

  13. China's Economic Stimulus Plan

    Institute of Scientific and Technical Information of China (English)

    Li Zhen

    2008-01-01

    @@ A plan being laid out As the global financial crisis continues to tear the world down, more than 20 world leaders gathered in Washington at the beginning of November for a meeting to come up with effective measures to cushion the blow of this crisis.

  14. Artificial Gravity Research Plan

    Science.gov (United States)

    Gilbert, Charlene

    2014-01-01

    This document describes the forward working plan to identify what countermeasure resources are needed for a vehicle with an artificial gravity module (intermittent centrifugation) and what Countermeasure Resources are needed for a rotating transit vehicle (continuous centrifugation) to minimize the effects of microgravity to Mars Exploration crewmembers.

  15. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  16. Great Expectations. [Lesson Plan].

    Science.gov (United States)

    Devine, Kelley

    Based on Charles Dickens' novel "Great Expectations," this lesson plan presents activities designed to help students understand the differences between totalitarianism and democracy; and a that a writer of a story considers theme, plot, characters, setting, and point of view. The main activity of the lesson involves students working in groups to…

  17. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  18. Operation plan : Alviso System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the operation plan for ponds A2W, A3W, A7, A14, and A16 in the Alviso System at San Francisco Bay NWR Complex. Operating instructions for both winter and...

  19. National Pandemic Influenza Plan

    OpenAIRE

    Department of Health

    2007-01-01

    National Pandemic Influenza Plan The purpose of this document is to tell you about pandemic influenza (flu), to explain what the Government and the health services are doing to prepare for a possible pandemic and most importantly, to advise you what you need to do if there is a pandemic. Click here to download PDF 614kb

  20. Planning Professional Learning

    Science.gov (United States)

    Guskey, Thomas R.

    2014-01-01

    Why does professional learning for educators have such a mixed history? Why is it so hard to find solid research evidence of professional development programs that actually improve student learning outcomes? Part of the answer, writes Thomas R. Guskey, is that professional learning experiences for educators are rarely well planned. Consequently,…

  1. ICBC Plans Record IPO

    Institute of Scientific and Technical Information of China (English)

    REN WEI

    2006-01-01

    @@ According to Dow Jones Newswires, the Industrial & Commercial Bank of China (ICBC) plans to float shares on both the Hong Kong and Shanghai exchanges at the end of October to net US$19 billion, exceeding NTT Mobile Communications Network Inc's US$18.4 billion in 1998.

  2. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  3. A Strategic Planning Workbook.

    Science.gov (United States)

    Austin, William

    This workbook outlines the Salem Community College's (New Jersey) Strategic Planning Initiative (SPI), which will enable the college to enter the 21st Century as an active agent in the educational advancement of the Salem community. SPI will allow college faculty, staff, students, and the local community to reflect on the vitality of the college…

  4. Planning for Power.

    Science.gov (United States)

    Failla, Victor A.; Birk, Thomas A.

    1999-01-01

    Discusses the electrical power problems that can arise when schools try to integrate educational technology components into an existing facility, and how to plan the electrical power design to avoid power failures. Examines setting objectives, evaluating current electrical conditions, and developing the technology power design. (GR)

  5. Chemical hygiene plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan was written to administer and monitor safety measures and chemical hygiene principles in the TAC Uranium Mill Tailing Remedial Action Project sample preparation facility in Albuquerque, New Mexico. It applies to toxic and/or hazardous materials to radioactive materials.

  6. Planning Educational Task

    NARCIS (Netherlands)

    Burgos, Daniel; Van Nimwegen, Christof

    2006-01-01

    Open Universiteit (Educational Technology Expertise Centre, Development Programme)(OUNL) and Utrecht Universiteit (Institute of information and computing sciences, Center for content and knowledge engineering)(UU) have carried out an experiment about user´s behaviour, adaptive learning and planning

  7. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  8. Chemical hygiene plan

    International Nuclear Information System (INIS)

    This plan was written to administer and monitor safety measures and chemical hygiene principles in the TAC Uranium Mill Tailing Remedial Action Project sample preparation facility in Albuquerque, New Mexico. It applies to toxic and/or hazardous materials to radioactive materials

  9. Magnetic Fusion Program Plan

    International Nuclear Information System (INIS)

    This Plan reflects the present conditions of the energy situation and is consistent with national priorities for the support of basic and applied research. It is realistic in taking advantage of the technical position that the United States has already established in fusion research to make cost-effective progress toward the development of fusion power as a future energy option

  10. Project Planning and Management

    NARCIS (Netherlands)

    Weide, van der A.; Beulens, A.J.M.; Dijk, van S.

    2003-01-01

    Project Planning and Management helps prepare the reader to contribute confidently and effectively when working on projects or in managing project teams. This books concentrates on the output of a project as well as the whole process. It is written for projects in the areas of IT and knowledge manag

  11. RPII Action Plan

    International Nuclear Information System (INIS)

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  12. Planning for Capital Reinvestment.

    Science.gov (United States)

    Biedenweg, Frederick; Weisburg-Swanson, Lynda; Gardner, Catherine

    1998-01-01

    Describes and evaluates four alternatives for planning and budgeting for capital reinvestment for college and university facilities: physical plant auditing; a depreciation-based approach; percentage of current replacement value; and facility subsystem modeling, or life-cycle modeling. Each has advantages and limitations in budgeting for and…

  13. Feminist Language Planning

    Science.gov (United States)

    Liddicoat, Anthony J.

    2011-01-01

    Feminist language planning is an active engagement with the ways in which language represents and reproduces gender. It is not specifically concerned with the ways in which language presents women, although this is a major focus, but rather how language positions both males and females and how it enters into the social practices that gender people…

  14. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  15. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  16. Approaches to participative planning : Potential applications in municipal energy planning

    OpenAIRE

    Ljung, Stina

    2010-01-01

    This thesis explores potential participatory approaches suitable for a municipal energy planning context. It also analyses the possibility of using those approaches in energy planning processes in ten Swedish municipalities. Swedish municipal energy plans display differences in terms of quality, comprehensiveness and implementation. According to participation literature, planning processes can be improved by stakeholder participation. This study was carried out in four steps: creation of a th...

  17. Planning for the Pandemic

    Directory of Open Access Journals (Sweden)

    Joanne Embree

    2006-01-01

    Full Text Available Over the past year, many of us have become involved in the development of strategic plans for the hospitals, health authorities and clinical practices in which we work in case an influenza pandemic occurs in the very near future. Planning for this on the front lines is difficult, due in large part to the uncertainties involved. How will the pandemic evolve? Is the current H5N1 strain of bird flu going to be 'the' one? How closely will the pandemic resemble that of 1918? Will it have the same transmission characteristics as the yearly endemic influenza strains or will it be so different that our routine infection prevention precautions for influenza will be ineffective? Will there be a useful vaccine that is widely available and safe? That the current death rate associated with H5N1 strain infections in humans is approximately 60% is quite frightening; an influenza pandemic with such a high death rate is almost incomprehensible. Therefore, it is a relief to hear that the upper estimates are at a much lower rate of approximately 5% in most suggested epidemiological models. Will the use of oseltamivir really work to prevent infection, illness, morbidity or death? If so, will there be sufficient supplies available in Canada? How are we supposed to make plans so that our medical system, which is already quite stressed, will be functional under the extreme conditions that are anticipated? One major difficulty is that we do not actually know how soon, if at all, the pandemic will occur. Specific, highly detailed plans made today may not be applicable in the future. As a result, most contingency plans are being made for a generic situation based on the general assumption that some percentage of the workforce will be absent from work for some specified period of time. In general, the plans tend to be impersonal because they concentrate on essential functions that need to be undertaken in an institution and assume that, with training, all personnel can

  18. Safety case plan 2008

    International Nuclear Information System (INIS)

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  19. PERSONNEL PLANNING. A COMPARATIVE OUTLOOK

    Directory of Open Access Journals (Sweden)

    Catalin Constantin SAMOILA

    2015-10-01

    Full Text Available From a very wide perspective, planning has raised lots of issues over time. Management and business theory struggle to teach what planning is, and why it is so dramatically important, in a manner which seemingly quotes Antoine de Saint-Exupery -“A goal without a plan is just a wish”, or sets up awareness through Benjamin Franklin’s famous words -“By failing to prepare, you are preparing to fail” [1]. However, some voices are circumspect or balance between the usefulness of plans and planning: “… plans are useless, but planning is indispensable” [2], while others, sporadically but decisively, criticize the entire organizational planning process, presenting it as a total failure [3]. Sometimes the ‘cons’ are right, meaning that real life might bring more surprise than ever expected. Even so, organizations benefit from planning by trying at least to ‘see’ one step forward, and to avoid total uncertainty or critical situations, if not to improve. The military ones are not exempt. Military planning has become the organic environment for such organizations since Napoleonic wars, or even longer ago. This present attempt does not intend to deeply analyze the antagonist advocacies over planning, but to bring under comparison, in a brief manner, the business-shaped theoretical approach of planning, against the real concerns of the Romanian military system in terms of manpower planning.

  20. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  1. Integrating Workforce Planning, Human Resources, and Service Planning.

    Science.gov (United States)

    O'Brien-Pallas, Linda; Birch, Stephen; Baumann, Andrea; Murphy, Gail Tomblin

    The feasibility of integrated health human resources planning (IHHRP) was examined. The analysis focused on the following topics: ways of integrating labor market indicators into service planning; whether planning is sufficiently responsive and flexible to retain relevance and validity in rapidly changing health systems; different models and…

  2. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier;

    2012-01-01

    at a national level, but they need to be supplemented by local plans also, since the most successful renewable energy projects to date are at a local level. For example, it is evident from the transition to renewable energy in Denmark, that 100% renewable energy systems can already be implemented at a local......Considering the security of supply concerns relating to the Irish energy system at present and the significant renewable energy resource available, many initiatives and policies have been developed to encourage the transition to renewable energy. These objectives are almost exclusively set...... level. Hence, by initiating local action, national targets can be met and exceeded, while also creating a template for a wider transition to renewable energy. Accordingly, the primary goal of the project is: To develop a local energy plan for Limerick and Clare which is based on a quantified assessment...

  3. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  4. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  5. Wildlife monitoring program plan

    Science.gov (United States)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  6. Beyond the business plan.

    Science.gov (United States)

    Harrison, J; Thompson, D; Flanagan, H; Tonks, P

    1994-01-01

    Acknowledges that business planning in the NHS frequently disappoints. Reasons for this are found in the tendency for managers to view the production of a plan as an end rather than a means. A further difficulty resides in the perception managers have of their world. Argues that marketing is the most appropriate paradigm for understanding and structuring this world at present. However, an adaptive cognitive style is necessary to allow constant reframing within the dominant paradigm or even reframing of the paradigm itself. In adopting these approaches, the probability of achieving competitive advantage is heightened. If they are ignored, however, it is likely that training and development techniques, however sophisticated, will have little lasting impact.

  7. Multistate Health Plans

    Directory of Open Access Journals (Sweden)

    Robert E. Moffit PhD

    2015-09-01

    Full Text Available We discuss and evaluate the Multi-State Plan (MSP Program, a provision of the Affordable Care Act that has not been the subject of much debate as yet. The MSP Program provides the Office of Personnel Management with new authority to negotiate and implement multistate insurance plans on all health insurance exchanges within the United States. We raise the concern that the MSP Program may lead to further consolidation of the health insurance industry despite the program’s stated goal of increasing competition by means of health insurance exchanges. The MSP Program arguably gives a competitive advantage to large insurers, which already dominate health insurance markets. We also contend that the MSP Program’s failure to produce increased competition may motivate a new effort for a public health insurance option.

  8. Plan og virkelighed

    DEFF Research Database (Denmark)

    Kaufmann, E.

    Der er dén bagside ved altid at se fremad og lægge planer, at man ikke rigtigt får tid til at se bagud og lære af sine fejl. I denne bog er det imidlertid forsøgt at se tilbage på to mindre planer, som blev lagt for 20 år siden. Hvordan svarer virkelighed til plan?......Der er dén bagside ved altid at se fremad og lægge planer, at man ikke rigtigt får tid til at se bagud og lære af sine fejl. I denne bog er det imidlertid forsøgt at se tilbage på to mindre planer, som blev lagt for 20 år siden. Hvordan svarer virkelighed til plan?...

  9. Hanford Emergency Response Plan

    International Nuclear Information System (INIS)

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures

  10. SE debt restructuring plan

    International Nuclear Information System (INIS)

    Slovenske elektrarne, a.s. (SE) plans to restructure one's own debts in 2003-2005. Debt restructuring plan is following: 2003: Collection of pre-payment on electricity - 60 million Euro (2.5 billion Slovak crowns), consumer unknown. Own promissory notes in total value of 100 million US$ (3.5 billion Slovak crowns) - in process. Sale of claims worth 2.4 billion Slovak crowns (57.21 million Euro) - negotiations in process. 2003/2004: Restructuring of loans payable IV. quarter 2003 and at the beginning of 2004 in value of 200 million Euro (8.3 billion Slovak crowns). Aim of SE is a new credit payable within 7 years, with instalments payable in the last two to three without any state subsidies. 2005: Loans worth 460 million Euro (189 billion Slovak crowns) will still remain. SE want to negotiate them with banks without state support

  11. Fusion technology development plan

    International Nuclear Information System (INIS)

    This Fusion Technology Development Plan (FTDP) has been prepared to show how the technology development program conducted by the Division of Development and Technology of the Office of Fusion Energy supports the overall magnetic fusion energy program as delineated in the March 17, 1983, DOE testimony before the Energy Research and Production Subcommittee of the House Committee on Science and Technology. A first draft of this plan distributed for comment in November 1981. since that draft was prepared, changes in expectations for funding in the program have led us to develop a set of priorities based on critical technology issues. These critical issues and the priority ranking of technology development efforts was accomplished with help from each of the major program participants

  12. CIPS Validation Data Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  13. Transpacific section planned

    Science.gov (United States)

    Swift, James

    1984-04-01

    A transpacific section across the subpolar gyre near latitude 47°N is planned for September-October 1985. This complements the 24.5°N section planned for March-May 1985. The purpose of the expedition is to determine the western boundary current structure, to determine the meridional flow in the region of the Emperor Seamounts, to measure the transport of heat by ocean currents, to determine the net transport of water masses and estimate the meridional general circulation of the north Pacific, and to improve the mapping of tracer distributions in the deep north Pacific.Approximately 110 surface-to-bottom conductivity, temperature, and depth (CTD) rosette stations across the width of the ocean will be occupied, with maximum station spacing of 80 km over abyssal plains, closing to 30-50 km over rough topography and boundaries. Water samples will be collected and analyzed on board for salinity, oxygen, and nutrients.

  14. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  15. Why family planning matters.

    Science.gov (United States)

    Jensen, Jeffrey T

    2011-06-01

    Family planning is one of the principle tools of human development. Ensuring that all babies are wanted and planned reduces health care and social costs. Human numbers will increase to 11 billion by the end of this century, and human activities are the leading cause of environmental change that threaten our health and happiness. Therefore, the provision of highly effective contraceptive methods represents an important priority of primary medical care. Since women and men with complicated medical problems remain interested in sex, medical and surgical specialists need to understand how contraception and pregnancy will interact with the underlying condition. This paper discusses the interaction between population growth and the environment, and reviews modern methods of contraception.

  16. Hanford Emergency Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

  17. Walkability Planning in Jakarta

    OpenAIRE

    Lo, Ria S. Hutabarat

    2011-01-01

    Walking is the main mode of transportation for many of the world’s people, particularly those in cities of the majority world. In the metropolitan region of Jakarta, walking in the public realm constitutes the main transportation mode for almost 40 percent of trips—a massive contribution to urban mobility. On the other hand, there is no comprehensive planning for pedestrians in an analogous manner to other modes of transportation. Pedestrian facilities are often dilapidated, damaged, dangerou...

  18. Family Planning in China

    Institute of Scientific and Technical Information of China (English)

    朱耀华

    1994-01-01

    China is a developing country with vast territory, numerous population and relatively poor economic foundation. The basic features of China's population are of great quantity and considerable annual increase of population as well as its uneven distribution in different regions. For improvement of living standard of the people,Chinese Government began to advocate family planning throughout this country in the beginning of the 1970s while a strenuous effort was made to develop economy.

  19. Individual Career Planning

    OpenAIRE

    Dina Paul; Teliceanu Viorel Gabriel; Chiriac Marius

    2011-01-01

    Individual career planning defines a complex and customized process, run in parallel on two temporal axes. The management of developing a career management is a challenge to every inidivid because the levers used are not standardized and can be adapted to any employer from the labor market An optimal behavior in short-term career management requires both deep knowledge of active methods for career development and their efficient handling. Professional succes can be ensured by a correct correl...

  20. Family Planning Services

    Institute of Scientific and Technical Information of China (English)

    米国庆

    1994-01-01

    According to the China national programme of economic and social development, by 2000 the standard of living of Chinese people will have been fairly welloff. In order to accomplish the goal, the government has comprised the population development in the national social economic development programme. Family planning (FP) work will contribute to the general goal of social economy and development. Reform and open policy and establishment of socialist market economy sys

  1. Trust and Estate Planning

    DEFF Research Database (Denmark)

    Harrington, Brooke

    2012-01-01

    , these professionals keep a significant portion of the world’s private wealth beyond the reach of the state. Trust and estate planning thus contributes to creating and maintaining socioeconomic inequality on a global scale. The significance of the profession has grown as wealth itself has become more fungible......, spurring innovation in legal, organizational, and financial strategies, and thwarting a myriad of laws and policies designed to limit enduring inequality in modern, democratic societies....

  2. Urban planning after terrorism

    OpenAIRE

    Paizs, Franziska

    2013-01-01

    Terrorism is a targeted way to hurt a population but also to destroy and annihilate a part of the civilization by attacking the built environment, especially iconic and symbolic buildings with its values of collective memory and cultural heritage, which is at the latest created by the iconic act of destruction. The resilient city with its integrated plans and programs but also technical, personal or physical security aims to reduce the probability and the dimension of terrorist attacks. Howev...

  3. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  4. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  5. Defense waste management plan

    International Nuclear Information System (INIS)

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  6. NRC Incident Response Plan

    International Nuclear Information System (INIS)

    The Nuclear Regulatory Commission (NRC) regulates civilian nuclear activities to protect the public health and safety and to preserve environmental quality. An Incident Response Plan had been developed and has now been revised to reflect current Commission policy. NUREG-0728, Rev. 2 assigns responsibilities for responding to any potentially threatening incident involving NRC licensed activities and for assuring that the NRC will fulfill it statutory mission. This report has also been reproduced for staff use as NRC Manual Chapter 0502

  7. Business Plan: Vietnamese Restaurant

    OpenAIRE

    Vo, Hong

    2014-01-01

    This thesis is about planning for a start-up Vietnamese restaurant in Helsinki center. Enjoying Asian food seems to be a trend for Finish people nowadays. In addition, Vietnamese cuisine is famous, delicious and worth- introduced around the world. The statistics of Vietnamese in foreign country is growing and Finnish people are more interested in Vietnamese culture. Therefore, opening a Vietnamese restaurant business in Helsinki center may be potential. The thesis begins with an introdu...

  8. SERC corporate plan 1993

    International Nuclear Information System (INIS)

    In its last Corporate Plan, the Science and Engineering Research Council (SERC) planned wide-ranging policy and programme reviews. These have been carried out and the results set the context for this plan. In addition, the SERC is responding to major changes in the higher education sector and a difficult financial climate. The Plan has been prepared before the Government's proposed White Paper on science and technology is available but is consistent with the SERC's advice on the White Paper. The SERC's ''mission statement'' recognises its dual role of strengthening the United Kingdom's capabilities in fundamental research and of developing capabilities in strategic research related to industrial and social need. Six strategic aims are identified: the funding of a portfolio of excellent research which contributes both to advancement of knowledge, and economic and social advance, the support of the training of scientists and engineers, the improvement of knowledge transfer within the ''science and engineering base'' and between this base and industry, the promotion of effective international collaboration, increasing the public awareness of research in science and engineering and improving the economy, efficiency and effectiveness of all of the SERC's operations. Within its programme expenditure, the SERC will examine whether funding should be extended to a wider range of bodies; develop new, more efficient, ways of funding higher education institutes (HEI) research; increase emphasis on output measures of research; specify service standards; and market-test scientific support activities. The SERC will make gains of at least 1.5% a year in efficiency of administration, through measures including market testing, and will extend management accounting systems. (Author)

  9. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  10. School Planning Manual.

    Science.gov (United States)

    Watson, Cicely; Quazi, Saeed

    This text arose out of a practicum course for school planners given by the authors at the Ontario Institute for Studies in Education. The practicum is the core course of an M.Ed. program, which was designed to prepare planning-administrators for work at the level of the board of education in a system of education such as that of the province of…

  11. The Student Plan

    DEFF Research Database (Denmark)

    Krejsler, John B.

    2009-01-01

    Schools in Nordic countries and beyond increasingly introduce social technology templates to meet the growing complexity of internal and external demands they are expected to deal with. One advantage of social technologies is that they reduce complexity in highly complex learning environments tha...... teachers and students in terms of the roles they may position themselves in. Some of the most prevalent social technologies adopted by schools today include project work, logbooks, social contracts, interactive testing, and student and personal action plans....

  12. Treatment planning systems

    International Nuclear Information System (INIS)

    All aspects of treatment planning in radiotherapy are discussed in detail. Included are, among others, machine data and their acquisition, photon dose calculations and tests thereof, criteria of acceptability, sources of uncertainties, from 2D to 3D and from 3D to IMRT, dosimetric measurements for RTP validation, frequency of QA tests and suggested tolerances for TPS, time and staff requirements, model based segmentation, multi-dimensional radiotherapy (MDCRT), and biological IMRT process. (P.A.)

  13. Strategic Planning Improves Manufacturing Performance

    OpenAIRE

    JS Armstrong

    2004-01-01

    A quantitative critique of 28 studies concludes that formal planning is valuable for firms. The results were particularly favorable for manufacturing firms: nine studies found formal planning to be associated with better performance and none found detrimental performance.

  14. Utility-Based HTN Planning

    NARCIS (Netherlands)

    Georgievski, Ilche; Lazovik, Alexander

    2014-01-01

    We propose the use of HTN planning for risk-sensitive planning domains. We suggest utility functions that reflect the risk attitude of compound tasks, and adapt a best-first search algorithm to take such utilities into account.

  15. 1994 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  16. Business Plan: Paper Recycling Plant

    OpenAIRE

    Ali, Muhammad; Askari, Sana; Salman, Muhammad; Askari, Sheba

    2008-01-01

    This Business Plan was written for Business Plan competition organized by Ministry of Youth Affairs Government of Pakistan. It explains the paper recycling business, its pros and cons, cost of paper recycling, plant options and feasibility.

  17. Energy Emergency and Contingency Planning

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Region 3 document outlines the purpose of Energy Emergency and Contingency Plans. These plans are intended to help refuges continue to function during energy...

  18. Planning and Implementing Cooperative Education.

    Science.gov (United States)

    Brown, Sylvia J.

    1978-01-01

    Implementing cooperative education requires careful planning, institutional support, and competent staffing. Suggestions for planning, setting objectives, recruiting students, job development, student counseling and placement, liaison with other colleges offices, and institutionalization are described. (Author/LBH)

  19. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  20. Planning Ahead: Advanced Heart Failure

    Science.gov (United States)

    ... Pressure High Blood Pressure Tools & Resources Stroke More Planning Ahead: Advanced Heart Failure Updated:Jul 7,2016 ... making your preferences known is called advance care planning. It allows you to speak for yourself, even ...

  1. Diabetes type 2 - meal planning

    Science.gov (United States)

    ... ency/article/007429.htm Diabetes type 2 - meal planning To use the sharing features on this page, ... foods have carbohydrates. This will help with meal planning so that you can keep your blood sugar ...

  2. Qualified Health Plan (QHP) Landscape

    Data.gov (United States)

    U.S. Department of Health & Human Services — QHP Landscape Files present basic information about certified Qualified Health Plans and Stand-alone Dental Plans for individuals-families and small businesses...

  3. [Remote radiation planning support system].

    Science.gov (United States)

    Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi

    2012-08-01

    We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy.

  4. Future land use plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  5. Site characterization plan:

    International Nuclear Information System (INIS)

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  6. TFTR DT plan summary

    International Nuclear Information System (INIS)

    This paper describes the plans to prepare TFTR for Deuterium-Tritium (DT) fueled experimental operations. Factors that are important in the preparation effort are: total neutron production of 3 x 10/sup 21/ in the CY 90 DT experimental program; design objective radiation dose of 10 mRem/year at the site boundary; maintenance and repair work will be limited after DT experiments have started, machine hardware, particularly components inside the igloo shielding, must be highly reliable. Included in the plan are both internal and external manipulators to perform limited tasks within the TFTR torus and around the exterior of the machine. Some hardware on TFTR, particularly the neutral beams and carbon tiles, will be modified to accommodate use of the manipulators. Preparatory work will be performed in parallel with experimental operations with the majority of the installation work occurring during the CY 88 and CY 89 shutdowns. Experimental operations plans are such that machine activation will be at or below the level that safely permits hands-on work at the machine during shutdowns

  7. Site characterization plan:

    International Nuclear Information System (INIS)

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  8. Mobile systems capability plan

    International Nuclear Information System (INIS)

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered

  9. Ontario's energy action plan

    International Nuclear Information System (INIS)

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  10. Cardiopulmonary discipline science plan

    Science.gov (United States)

    1991-01-01

    Life sciences research in the cardiopulmonary discipline must identify possible consequences of space flight on the cardiopulmonary system, understand the mechanisms of these effects, and develop effective and operationally practical countermeasures to protect crewmembers inflight and upon return to a gravitational environment. The long-range goal of the NASA Cardiopulmonary Discipline Research Program is to foster research to better understand the acute and long-term cardiovascular and pulmonary adaptation to space and to develop physiological countermeasures to ensure crew health in space and on return to Earth. The purpose of this Discipline Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of cardiopulmonary sciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of both cardiovascular and pulmonary function. It contains a general plan that will be used by both NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational (intramural and extramural) research and development activities in this area.

  11. Musculoskeletal discipline science plan

    Science.gov (United States)

    1991-01-01

    Life sciences research in the musculoskeletal discipline must identify possible consequences of weightlessness on this system, understand the mechanisms of these effects, and develop effective and operationally practical countermeasures to protect crewmembers. The musculoskeletal system is highly plastic in that is possesses the inherent capability to adapt its structural and functional properties in accordance with the type and degree of stimuli imposed on it. Prolonged space travel is essentially a period of significant unloading of the musculoskeletal system. This results in adaptive responses in the structure and function of this system, placing it on the low end of a continuum from one of complete disuse to one of maximal use. There is a high probability that the musculoskeletal system is functionally impaired with increasing duration of weightlessness. The purpose of this Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences division research and development activities in the area of musculoskeletal function. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines research opportunities, which encompass critical questions in the subdiscipline areas (e.g., muscle, bone, and other musculoskeletal connective tissues). These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document contains a general plan that will be used by both NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.

  12. Future land use plan

    International Nuclear Information System (INIS)

    The US Department of Energy's (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ''Future Land Use'' initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities' interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory's view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts

  13. TRUPACT-1 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  14. Professional analysis in spatial planning

    Directory of Open Access Journals (Sweden)

    Andrej Černe

    2005-12-01

    Full Text Available Spatial analysis contributes to accomplishment of the three basic aims of spatial planning: it is basic element for setting spatial policies, concepts and strategies, gives basic information to inhabitants, land owners, investors, planners and helps in performing spatial policies, strategies, plans, programmes and projects. Analysis in planning are generally devoted to: understand current circumstances and emerging conditions within planning decisions; determine priorities of open questions and their solutions; formulate general principles for further development.

  15. Planning and learning under uncertainty

    OpenAIRE

    Jiménez Celorrio, Sergio

    2011-01-01

    Automated Planning is the component of Artificial Intelligence that studies the computational process of synthesizing sets of actions whose execution achieves some given objectives. Research on Automated Planning has traditionally focused on solving theoretical problems in controlled environments. In such environments both, the current state of the environment and the outcome of actions, are completely known. The development of real planning applications during the last decade (planning fire ...

  16. Practical planning extending the classical AI planning paradigm

    CERN Document Server

    Wilkins, David E

    2014-01-01

    Planning, or reasoning about actions, is a fundamental element of intelligent behavior--and one that artificial intelligence has found very difficult to implement. The most well-understood approach to building planning systems has been under refinement since the late 1960s and has now reached a level of maturity where there are good prospects for building working planners. Practical Planning is an in-depth examination of this classical planning paradigm through an intensive case study of SIPE, a significantly implemented planning system. The author, the developer of SIPE, defines the plann

  17. Strategic Planning for Higher Education.

    Science.gov (United States)

    Kotler, Philip; Murphy, Patrick E.

    1981-01-01

    The framework necessary for achieving a strategic planning posture in higher education is outlined. The most important benefit of strategic planning for higher education decision makers is that it forces them to undertake a more market-oriented and systematic approach to long- range planning. (Author/MLW)

  18. A Plan for All Seasons.

    Science.gov (United States)

    Golden, Sandra

    1993-01-01

    Planning can help college public relations officials make the most of their time and energy. One approach includes reviewing institutional mission and strategic plan; setting department goals; identifying and targeting audiences; establishing interdepartmental links; and setting out action, crisis, budget, and evaluation plans in writing. (MSE)

  19. Security Planning in IT Systems

    OpenAIRE

    Radu CONSTANTINESCU

    2006-01-01

    Security planning is a necessity nowadays. Planning involves policies, controls, timetable and a continuing attention. Policies are the foundation of effective information security. Security policies challenge users to change the way they think about their own responsibility for protecting corporate information. The paper presents the compulsive elements of security planning.

  20. Our Changing Concept of Planning.

    Science.gov (United States)

    Ackoff, Russell L.

    1982-01-01

    The author describes an approach to planning that differs from conventional concepts. This approach, called interactive or proactive planning, deals with interdependent problems and pursues goals, objectives, and ideals. Emphasizing that ideals play the key role in interactive planning, Ackoff contrasts this approach with prevailing planning…

  1. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  2. New Plan,Great Efforts

    Institute of Scientific and Technical Information of China (English)

    YU SHUJUN

    2010-01-01

    @@ This year marks the end of China's 1 1th Five-Year Plan for National Economic and Social Development (2006-10). While reviewing the past five years of development and the implementation of the plan, policymakers are working around the clock to bring out thenext--the 12th Five-Year Plan (2011-15).

  3. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  4. Unvented Drum Handling Plan

    International Nuclear Information System (INIS)

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  5. Digital Architecture Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Oxstrand, Johanna Helene [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Al Rashdan, Ahmad Yahya Mohammad [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Bly, Aaron Douglas [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Rice, Brandon Charles [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Fitzgerald, Kirk [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Wilson, Keith Leon [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS)

    2016-03-01

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including

  6. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  7. Foresighted urban planning

    Directory of Open Access Journals (Sweden)

    Dalia Bardauskienė

    2012-03-01

    Full Text Available Lithuania is urbanized country, about 70 % of poluation lives in urban areas. Curent urbanization is organized  by the new territorial planning law, which came into force in 1995. New system was applied on the developing market and democracy conditions, why it is not fully developed till nowadays. New urban planning and management system are rapidly changing the spatial patterns of Lithuania. How much those changes are foresighted in transformation process towards sustainable development? What actions are needed and whom participation is necessary to avoid the influence of current trends? The analyses of demographic trends and the Master plans of Lithuanian metropolitan cities and suburban municipalities shows unconformity to the existing social and economical trends. While the population is decreasing the huge need of land for new developmet had been planned. The spread of urban structures to the rural areas had raised the need and price of infrastructure and public services, it induced inhabitants dependence from own cars, enhanced environment pollution and consumption of energy resources. Current EU policy documents and the expert organizations the suburbanization are describing as „urban sprawl"which does not meet the principles of sustainable development [1,2,3,6]. Urban sprawl is a matter of concern in Europe, but only few cities (notably in Northern Europe are coping well. The sprawl in cities of Eastern Europe iliustrate the developmet of "free for all" of 1990 and impact of transition from socialist to free-market economy with its effect on local economies, social patterns and planning system. [4]. The growth of suburbanization, when the local economy and population decline, in Lithuania had occurred not long ago, urban dictionaries do not include the precise equivalent for the term above. Local specialists call it as "urban chaos" or "spread of compact urban structures", etc. [5]. The contributors think the guide for the foresighted

  8. Brainstorming: an application for programme planning in family welfare planning.

    Science.gov (United States)

    Kumaran, T V

    1985-01-01

    There have been many participatory devices developed and applied for programme planning in a variety of fields by the social scientists in the recent past, of which brainstorming is one. This device has been widely used in interpretive structural modelling to higher education programme planning, programme planning for housing in urban development, etc. Following these studies, application of brainstorming to develop a preliminary operational value system as a structural model for programme planning in Family planning was attempted. The products of a sequence of three sessions of approximately 5 hours each generated 39 needs, 28 alterables, and 22 constraints, all of which were used to set Family Planning objectives /34/. The objectives thus derived were used in building an intent structure to understand their priorities in plan formulation and eventual implementation.

  9. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos;

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  10. Behavior-based evacuation planning

    KAUST Repository

    Rodriguez, Samuel

    2010-05-01

    In this work, we present a formulation of an evacuation planning problem that is inspired by motion planning and describe an integrated behavioral agent-based and roadmap-based motion planning approach to solve it. Our formulation allows users to test the effect on evacuation of a number of different environmental factors. One of our main focuses is to provide a mechanism to investigate how the interaction between agents influences the resulting evacuation plans. Specifically, we explore how various types of control provided by a set of directing agents effects the overall evacuation planning strategies of the evacuating agents. ©2010 IEEE.

  11. Lesson plans in surgical training.

    Science.gov (United States)

    Lester, S E; Robson, A K R

    2007-06-01

    Lesson plans in surgery enable trainers and trainees to agree on goals that balance training needs with service commitments. Lesson plans are individualised to the trainee and encourage ownership of learning. They are based on SMART criteria and therefore have a sound educational footing. Most of the work in creating a lesson plan falls to the trainee. The total time for creation of each plan is approximately 20 min. Our use of lesson plans for surgical training has been met with favourable response from both trainer and trainees.

  12. Marketing plan for ETE MEDIA

    OpenAIRE

    Krysanov, Kirill

    2014-01-01

    The objective of the thesis is to gather information on the process of market planning and the development of a marketing plan for the video production company ETE MEDIA, which is owned by the author of this thesis. The purpose of the marketing plan is to help ETE MEDIA improve its business model, attract more customers and attain profitability. The author aims to answer the following questions: Why is it essential for small companies to have a marketing plan? How does such a plan differ...

  13. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  14. Containment integrity research program plan

    International Nuclear Information System (INIS)

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  15. Improving Planning Support : The use of planning support systems for spatial planning

    NARCIS (Netherlands)

    Vonk, Guido Antonius

    2006-01-01

    Spatial planning is one of the most complex activities of public organizations. Since approximately halfway the 1990s a new generation of geo-information technologies has become available to support those involved in planning in handling the complexity: Planning Support Systems (PSS). PSS consist of

  16. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  17. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans....... To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...... plan valuation and the plans process content were found. This suggests that investors prefer plans with strategy and context descriptions to plans with high or unknown execution risk. We also found significant differences in structure and innovation content for the following polar opposite innovation...

  18. Planning as an Iterative Process

    Science.gov (United States)

    Smith, David E.

    2012-01-01

    Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

  19. Telecommunications Network Plan

    International Nuclear Information System (INIS)

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM's information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program's Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs

  20. ESnet Program Plan 1994

    International Nuclear Information System (INIS)

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  1. Neuroscience discipline science plan

    Science.gov (United States)

    1991-01-01

    Over the past two decades, NASA's efforts in the neurosciences have developed into a program of research directed at understanding the acute changes that occur in the neurovestibular and sensorimotor systems during short-duration space missions. However, the proposed extended-duration flights of up to 28 days on the Shuttle orbiter and 6 months on Space Station Freedom, a lunar outpost, and Mars missions of perhaps 1-3 years in space, make it imperative that NASA's Life Sciences Division begin to concentrate research in the neurosciences on the chronic effects of exposure to microgravity on the nervous system. Major areas of research will be directed at understanding (1) central processing, (2) motor systems, (3) cognitive/spatial orientation, and (4) sensory receptors. The purpose of the Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of neurosciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of nervous system function. It contains a general plan that will be used by NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.

  2. ESnet Program Plan 1994

    Energy Technology Data Exchange (ETDEWEB)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  3. Vision, Plan and Reality

    DEFF Research Database (Denmark)

    Steinø, Nicolai

    , the theoretical study is organized as a threefold investigation of urban design theory, planning theory, as well as urban theory. As urban design in practice must consider what the built environment should be like as well as how it is developed, it must include normative as well as procedural considerations. Thus...... of achieving what it is aiming at, something must be wrong with it. Thus, the basic argument of the thesis is, that the answer to this question must be sought within urban design itself, rather than within the context in which it operates. In order to approach the research question, the thesis is organized...

  4. Planning for IPv6

    CERN Document Server

    Hagen, Silvia

    2011-01-01

    It's official: with IPv4 network addresses close to depletion, moving to IPv6 is now business critical. This concise book helps you plan for IPv6 integration by providing a high-level overview of the technical-and nontechnical-steps involved. Many of the challenges for your enterprise are on the organizational level, and solutions differ from company to company. IPv6 Essentials author Silvia Hagen, a protocol analysis and directory service expert who's worked with IPv6 international groups and forums for 10 years, supplies answers to the issues most frequently discussed by the clients she co

  5. Transportation Business Plan

    International Nuclear Information System (INIS)

    The Transportation Business Plan is a step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and describing requirements of the transportation system. Included in the document are strategies for procuring shipping casks and transportation support services. In the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle

  6. The Household Planning Game

    DEFF Research Database (Denmark)

    Koch, Louise; Ramsøy, Thomas Z.; Nyström, Marcus

    2014-01-01

    Two common reasons why people end up in personal financial problems are either because they have not learned to manage a budget, or because they have unrealistic expectations of what they can afford to buy. To assess potential level for risk-seeking behavior in daily life, we created a novel test...... shopping or budget planning situation. The selection of a card was associated with a monetary reward, but the card selection was also associated with a risk of receiving a penalty, which could be greater than the reward. The aim was to win as much money as possible. Rewards and penalties were modelled...

  7. SEA and planning

    DEFF Research Database (Denmark)

    Stoeglehner, G.; Brown, A.L.; Kørnøv, Lone

    2009-01-01

    As the field of strategic environmental assessment (SEA) has matured, the focus has moved from the development of legislation, guidelines and methodologies towards improving the effectiveness of SEA. Measuring and of course achieving effectiveness is both complex and challenging. This paper......, and the relationship of the SEA to the planning activity itself. This paper focuses on the influence that planners have in these implementation processes, postulating the hypothesis that these are key players in achieving effectiveness in SEA. Based upon implementation theory and empirical experience, the paper...

  8. Navy Geothermal Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-12-01

    Domestic geothermal resources with the potential for decreasing fossil fuel use and energy cost exist at a significant number of Navy facilities. The Geothermal Plan is part of the Navy Energy R and D Program that will evaluate Navy sites and provide a technical, economic, and environmental base for subsequent resource use. One purpose of the program will be to provide for the transition of R and D funded exploratory efforts into the resource development phase. Individual Navy geothermal site projects are described as well as the organizational structure and Navy decision network. 2 figs.

  9. Customer Service Action Plan

    OpenAIRE

    Department of Health (Ireland)

    2003-01-01

    Customer Service Action Plan One of the fundamental themes of Delivering Better Government (1996) is the â?oachievement of an excellent service for the Government and for the public as customers and clients at all levelsâ?Âù. In 2000, the Quality Customer Service (QCS) Working Group reviewed and revised the 1997 Principles of Quality Customer Service to take account of changes in the environment since 1997, such as the equality agenda. In July 2000, the Government decided that: Click ...

  10. Leading change: 2--planning.

    Science.gov (United States)

    Kerridge, Joanna

    National initiatives have outlined the importance of involving frontline staff in service improvement, and the ability to influence and manage change has been identified as an essential skill for delivering new models of care. Nurses often have to take the lead in managing change in clinical practice. The second in a three-part series is designed to help nurses at all levels develop the knowledge and skills to function as change agents within their organisations. This article focuses on planning the change and dealing with resistance. PMID:22439509

  11. AB Manpower Plan 2007

    CERN Document Server

    Myers, Stephen

    2007-01-01

    The present exercise is not as such a "manpower plan" but a purely budgetary comparison of known plus requested resources with the known commitments over the period 2007-2012. From a purely budgetary point of view, AB will have the capacity to maintain all those recently hired staff who fulfill the criteria for long term employment at CERN. Following this budgetary exercise, AB proposes to perform a CERN-wide staff work plan so as to compare the manpower available to the quantity of work to be done in the totality of the work-packages. If there is a significant mismatch between these two quantities then we propose the following measures which would create personnel economies and allow us to redress the mismatch by increased recruitment: a new job severance scheme; CERN restructuring; use of the new CERN-ITER agreement; more flexibility in transfers from Materials to Personnel budgets. Failing this a re-examination of possible closure of lower priority facilities may be needed.

  12. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  13. Corporate plan 1978

    International Nuclear Information System (INIS)

    The CEGB Corporate Plan is intended as a background document for those in the industry and as a basis for discussions with the Department of Energy on investment programmes and energy policy generally. It contains the most recent information on actions taken or agreed, on remaining problems and an options for further action on these problems. Following an introduction summarising the CEGB's objectives and recent progress the issues are discussed under the following main headings: energy policy background; medium term plans; the year ahead; options, actions and conclusions. Appendices include: three energy scenarios, one a reference case by the Department of Energy, and two CEGB scenarios which identify a credible range of future electricity demands; 1978 capital investment proposals; and medium term forecasts for demand and plant position at winter peak, and for bulk costs and unit sales. The board intends to continue to develop a suitable long term nuclear strategy which includes thermal reactors and the development of the fast reactor as a viable option. (U.K.)

  14. Human Factors Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    Paramore, B.; Peterson, L.R. (eds.)

    1985-12-01

    ''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management.

  15. Human Factors Review Plan

    International Nuclear Information System (INIS)

    ''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management

  16. Entertainment Landscape Planning

    Directory of Open Access Journals (Sweden)

    Jurga Kučinskienė

    2012-03-01

    Full Text Available The entertainment society can not imagine the life without entertainment. It is not enough to a human just to come to an amusement park. He/she wants a theme park which is guided by the need not only for extreme experiences but also the environment that must be formed in such a way that satisfies all the five senses. Sensory stimulators that accompany the experiences have to maintain and enrich its theme. The more senses, the more effective and more memorable experiences, then the bigger part of society will be satisfied. To have such experiences there should be a suitable environment – the entertainment landscape. The article deals with the features of entertainment landscape planning, analyzes the performances of entertainment park and theme park design items; it contains the rules of specific landscape plan used for the entertainment landscape design and the entertainment landscape design techniques. The article is illustrated with the examples of entertainment landscape theme parks and analyzes the significance of entertainment landscape creation in modern experience society.DOI: http://dx.doi.org/10.5755/j01.erem.59.1.659

  17. The text plan concept: contributions to the writing planning process

    Directory of Open Access Journals (Sweden)

    Ana Lúcia Tinoco Cabral

    2013-12-01

    Full Text Available Students - at different levels, ranging from early grades up to PhD - face problems both on comprehension and text production. This paper focuses on the text plan concept according to the DTA (Discourse Text Analysis approach, i.e., a principle of organization that allows students to put into practice the production intention as well as to arrange text information while producing; being responsible for the text compositional structure (Adam, 2008. The study analyzes the relation between text plan and the writing planning process, in which the first one provides the second with theoretical support. In order to develop such research, the study covers some issues related to the reading skill, analyzes an argumentative text as per its textual plan, and presents some reflections on the writing process, focusing on the relation between textual plan and the writing planning process.

  18. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  19. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  20. Determining Redundant Actions in Sequential Plans

    OpenAIRE

    Chrpa, Lukáš; McCluskey, T.L.; Osborne, Hugh

    2012-01-01

    Automated planning even in its simplest form, classical planning, is a computationally hard problem. With the increasing involvement of intelligent systems in everyday life there is a need for more and more advanced planning techniques able to solve planning problems in little (or real) time. However, planners designed to solve planning problems as fast as possible often provide solution plans of low quality. The quality of solution plans can be improved by their post-planning analysis by whi...

  1. Groundwater regulation and integrated planning

    Science.gov (United States)

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  2. Mind mapping for business planning and marketing plans

    OpenAIRE

    Boskov, Tatjana; Lazaroski, Spire

    2010-01-01

    In order to market effectively, it is important to have a clear understanding of what the market is currently like and your position in it. This can be extended to looking for ways that can extend the market, bridge to another market, or create a new market entirely. So, marketing control is important. Marketing plans using Mind Mapping because marketers need plans. But more importantly, you need "buy-in" from everyone involved to ensure the plan receives maximum support. So...

  3. Information center/ system planning: Physical layout and facilities planning

    OpenAIRE

    M.S. Sridhar

    1995-01-01

    Highlights the general issues of physical planning for libraries and explores alternate plans from the angle of collection, users, staff, etc. Provides practical tips for the whole exercise of physical planning for libraries and for acquiring equipment and furniture. Discusses related aspects like space estimation, allocation and utilization. A case study of projecting requirements of space for a special library, ISRO Satellite Centre (ISAC) Library is presented with emphasis on practical asp...

  4. 36 CFR 219.30 - Plan documentation.

    Science.gov (United States)

    2010-07-01

    ... Section 219.30 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Planning Documentation § 219.30 Plan... other information relevant to how the plan area is to be managed. Planning documents should be...

  5. Succession planning. A strategy for taking charge.

    Science.gov (United States)

    Bower, F L

    2000-01-01

    This article on succession planning includes a definition of succession planning, the reasons for and components of succession planning, and why succession planning is important to the leadership of an organization, unit, division or department. Each component of succession planning, that is, vision, networking, and mentorship, is described, with examples that are intended to guide the reader to initiate and evaluate succession planning.

  6. 7 CFR 1210.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1210.303 Section 1210.303 Agriculture... PLAN Watermelon Research and Promotion Plan Definitions § 1210.303 Plan. Plan means this watermelon research and promotion Plan issued by the Secretary pursuant to the Act....

  7. Implementation of a planning system using GCLA

    OpenAIRE

    Palmkvist, Johan

    1989-01-01

    This report describes a planning system implemented in GCLA. A definition of planning in the house world, which is a superset of STRIPS-like planning, is given, as well as a short introduction to the programming language GCLA. The blocks world and STRIPS-like planning is described, followed by a comparison between STRIPS-like planning and planning in the house world.

  8. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  9. Strategic Planning for Educational Reform and Improvement.

    Science.gov (United States)

    D'Amico, Joseph J.

    This paper applies the strategic planning process to the task of school renewal and improvement. After outlining the basic elements of stratgic planning (planning-to-plan phase, research, writing a mission statement, forecasting, contingency planning, and development of the strategic plan), the paper focuses on using this model to restructure…

  10. PPARC. 1998 business plan

    International Nuclear Information System (INIS)

    The 1998 PPARC Business Plan is based on the allocation of Pound Sterling 191.268M for 1998/99 set out in 'Allocation of the Science Budget 1998-99'. The objectives and programme to be pursued by PPARC in the years 1998/99 to 2001/02 inclusive are set out; the internal programme guidelines remain largely as in the 1997 Business Plan. Detailed spending plans have only been drawn up for 1998/99, pending the outcome of the government's Comprehensive Spending Review (CSR), and may have to be revised in the light of that Review. Firm commitments for domestic expenditure already made, or to be made before the outcome of the CSR is known, will not exceed 95% of the domestic expenditure allocation for 1998/99 in 1999/00, and 90% thereof in 2000/01. The past decade has been one of exceptional progress in both astronomy and particle physics, with the very real prospect of making further major advances in the next decade. PPARC supported scientists have played a significant role in securing this progress, and Council is concerned to ensure that they should continue to do so. The recognised world-class strength of current and past UK research and training in astronomy and particle physics is in large measure due to investments made ten or more years ago, and this investment must continue into the future. Since its inception in 1994, Council has been striving to create additional headroom for new investment, and this Business Plan is the first in which Council's efforts will be fully realised, with the restructuring of the Royal Observatories being completed in 1998199, continued efficiency gains at all sites, and reduction in the CERN and ESA budgets, all contributing to increased flexibility in the domestic science programme. The PPARC programme is dominated by long term international commitments with a planning horizon which extends well beyond 2001/02. Council therefore plans on a correspondingly long timescale, drawing on the 'Road Map' of opportunities of the highest

  11. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example...... of how the methodology he developed for power studies, called "phronetic planning research," may be employed in practice. Phronetic planning research follows the tradition of power studies running from Machiavelli and Nietzsche to Michel Foucault and Pierre Bourdieu. It focuses on four value......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  12. Employer-sponsored pension plans

    Directory of Open Access Journals (Sweden)

    Rakonjac-Antić Tatjana N.

    2004-01-01

    Full Text Available Apart from pension plans within social insurance, in developed pension systems there are also available to individuals schemes which may to a large extent ensure a significant part of their total pension. Among them are the following: employer-sponsored pension plans or individual pension plans. The most widely used employer-sponsored pension plan in the USA is 401(k, in which both the employer and the employee contribute to the financing of the pension. These contributions as well as the return to their investment have a preferential tax treatment, i.e. do not enter a tax base. The funds are taxed only when drawn from the account in the form of a pension. This paper aims to present the functioning of 401(k pension plan as the most widely used employer sponsored pension plan in the USA, which is likely, in a modified form, to have an important place within our future reformed pension insurance system.

  13. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example...... of how the methodology he developed for power studies, called "phronetic planning research," may be employed in practice. Phronetic planning research follows the tradition of power studies running from Machiavelli and Nietzsche to Michel Foucault and Pierre Bourdieu. It focuses on four value......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  14. Bootstrap planning: Theory and application

    Energy Technology Data Exchange (ETDEWEB)

    Chen, P.C.

    1994-02-01

    We identify a general framework for weak planning called bootstrap planning, which is defined as global planning using only a local planner along with some memory for learning intermediate subgoals. We present a family of algorithms for bootstrap planning, and provide some initial theory on their performance. In our theoretical analysis, we develop a random digraph problem model and use it to make some performance predictions and comparisons of these algorithms. We also use it to provide some techniques for approximating the optimal resource bound on the local planner to achieve the best global planner. We validate our theoretical results with empirical demonstration on the 15-puzzle. We show how to reduce the planning cost of a global planner by 2 orders of magnitude using bootstrap planning. We also demonstrate a natural but not widely recognized connection between search costs and the lognormal distribution.

  15. Strategic planning in healthcare organizations.

    Science.gov (United States)

    Rodríguez Perera, Francisco de Paula; Peiró, Manel

    2012-08-01

    Strategic planning is a completely valid and useful tool for guiding all types of organizations, including healthcare organizations. The organizational level at which the strategic planning process is relevant depends on the unit's size, its complexity, and the differentiation of the service provided. A cardiology department, a hemodynamic unit, or an electrophysiology unit can be an appropriate level, as long as their plans align with other plans at higher levels. The leader of each unit is the person responsible for promoting the planning process, a core and essential part of his or her role. The process of strategic planning is programmable, systematic, rational, and holistic and integrates the short, medium, and long term, allowing the healthcare organization to focus on relevant and lasting transformations for the future.

  16. GEND planning report

    International Nuclear Information System (INIS)

    The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal

  17. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  18. Plans and detours.

    Science.gov (United States)

    Wei, James

    2014-01-01

    At various stages of my career, I made and followed plans for progress and growth. However, owing to several unexpected challenges, I had to make detours into unplanned vistas. When I look around at the careers of my former students and younger colleagues, I see fewer long-term, stable positions and frequent changes both in employers and in functions every ten or twenty years. Our curriculum prepares our students for manufacturing careers in the United States, but the current trend of corporate merger and outsourcing can suddenly turn their work into marketing or finance in the Far East. A fox that knows many tricks may be better suited to changing environments than a hedgehog that knows only one single trick. Perhaps future education should not only teach few subjects in depth for immediate career needs but also teach adaptability to unrelated challenges. PMID:24328954

  19. Regional transmission subsystem planning

    Energy Technology Data Exchange (ETDEWEB)

    Costa Bortoni, Edson da [Quadrante Softwares Especializados Ltda., Itajuba, MG (Brazil); Bajay, Sergio Valdir; Barros Correia, Paulo de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica; Santos, Afonso Henriques Moreira; Haddad, Jamil [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    This work presents an approach for the planning of transmission systems by employing mixed--integer linear programming to obtain a cost and operating characteristics optimized system. The voltage loop equations are written in a modified form, so that, at the end of the analysis, the model behaves as a DC power flow, with the help of the two Kirchhoff`s laws, exempting the need of interaction with an external power flow program for analysis of the line loading. The model considers the occurrence of contingencies, so that the final result is a network robust to the most severe contingencies. This whole technique is adapted to the regional electric power transmission subsystems. (author) 9 refs., 4 figs.

  20. Planning tiger recovery

    DEFF Research Database (Denmark)

    Wilting, Andreas; Courtiol, Alexandre; Christiansen, Per;

    2015-01-01

    approaches to plan tiger recovery are partly impeded by the lack of a consensus on the number of tiger subspecies or management units, because a comprehensive analysis of tiger variation is lacking. We analyzed variation among all nine putative tiger subspecies, using extensive data sets of several traits...... two subspecies: the Sunda tiger, Panthera tigris sondaica, and the continental tiger, Panthera tigris tigris, which consists of two (northern and southern) management units. Conservation management programs, such as captive breeding, reintroduction initiatives, or trans-boundary projects, rely......, which will have profound implications for the management of in situ and ex situ tiger populations and boost conservation efforts by facilitating a pragmatic approach to tiger conservation management worldwide....

  1. CWTC Business Plan

    DEFF Research Database (Denmark)

    Jensen, Peter Hjuler; Hillestrøm, Adam; Markou, Helen;

    This report presents the Business Plan for the establishment of the Wind Turbine Component Centre (CWTC) to meet the objectives of performing theoretical research and experimental testing. The core idea of a CWTC is to support the Danish wind energy industry and research activities at the component...... level improving the competitive advantage of that industry. The CWTC will in itself operate its activities, including access to test and experimental facilities, on a semi commercial basis. The business model for the CWTC presented is based on revenues coming from component manufacturers as well...... as research grants, and will include membership fees as well as hourly payment and larger projects where payment is a limited project sum. The presented roadmap model clarifies the development path towards a fully developed CWTC, which will cover test of all important components along the drive-train as well...

  2. Graphite Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. Windes; T. Burchell; M.Carroll

    2010-10-01

    The Next Generation Nuclear Plant (NGNP) will be a helium-cooled High Temperature Gas Reactor (HTGR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Graphite has been used effectively as a structural and moderator material in both research and commercial high-temperature gas-cooled reactors. This development has resulted in graphite being established as a viable structural material for HTGRs. While the general characteristics necessary for producing nuclear grade graphite are understood, historical “nuclear” grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermomechanical design of the structural graphite in NGNP is based. This Technology Development Plan outlines the research and development (R&D) activities and associated rationale necessary to qualify nuclear grade graphite for use within the NGNP reactor.

  3. GEND planning report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

  4. MRI assisted radiotherapy planning

    International Nuclear Information System (INIS)

    To obtain the optimal radiation field, an MR simulation system (MRSS) has been developed. The system consists of an MR unit, a work station and a laser marking system. Phantom study concerned geographic distortion and the total accuracy of MRSS, the former revealed the result lesser than 1 mm within 90 mm-distance between MR slices and Center of magnetic field, the latter showed maximal errors 2 mm in the field size, and 3 mm in the iso-center. This system was applied to 15 patients with intracranial or head and neck lesions and all procedures were smoothly performed. To evaluate the usefulness of MRSS, 6 radiation oncologists compared the difference between MRSS and CT simulation system in setting radiation field. The results were satisfactory especially in cases with lesions the extent of which was unclear on CT images. It was considered that this system could support the radiotherapy planning for intracranial or head and neck lesions. (author)

  5. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  6. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  7. Strategic planning in transition

    DEFF Research Database (Denmark)

    Olesen, Kristian; Richardson, Tim

    2012-01-01

    In this paper, we analyse how contested transitions in planning rationalities and spatial logics have shaped the processes and outputs of recent episodes of Danish ‘strategic spatial planning’. The practice of ‘strategic spatial planning’ in Denmark has undergone a concerted reorientation...... style of ‘strategic spatial planning’ with its associated spatial logics is continuously challenged by a persistent regulatory, top-down rationality of ‘strategic spatial planning’, rooted in spatial Keynesianism, which has long characterised the Danish approach. The findings reveal the emergence...... of a particularly Danish approach, retaining strong regulatory aspects. However this approach does not sit easily within the current neoliberal political climate, raising concerns of an emerging crisis of ‘strategic spatial planning’....

  8. Development concept plan

    International Nuclear Information System (INIS)

    The following management objectives for New River Gorge National River relate to the Kaymoor site to: Preserve coal mining, railroad, and other historic resources that best illustrate park significance; Develop a system of land- and water-based recreation opportunities that allow visitors to experience the park's resources to the extent that natural, cultural, and scenic values are not imparied; and Work with the community to the extent possible to help it maximize economic benefits related to park development without impairing key resources. The Development Concept Plant outlining a plan of development for Kaymoor is a part of a larger emphasis by the National Park Service to identify and develop significant coal-related historic and cultural resources in southern West Virginia in cooperation with the West Virginia State Historic Preservation Office

  9. Flight plan optimization

    Science.gov (United States)

    Dharmaseelan, Anoop; Adistambha, Keyne D.

    2015-05-01

    Fuel cost accounts for 40 percent of the operating cost of an airline. Fuel cost can be minimized by planning a flight on optimized routes. The routes can be optimized by searching best connections based on the cost function defined by the airline. The most common algorithm that used to optimize route search is Dijkstra's. Dijkstra's algorithm produces a static result and the time taken for the search is relatively long. This paper experiments a new algorithm to optimize route search which combines the principle of simulated annealing and genetic algorithm. The experimental results of route search, presented are shown to be computationally fast and accurate compared with timings from generic algorithm. The new algorithm is optimal for random routing feature that is highly sought by many regional operators.

  10. FM consolidation plan

    CERN Document Server

    Nonis, M; CERN. Geneva. TS Department

    2008-01-01

    The average life duration of infrastructure being 30 years, preventive or corrective maintenance is not enough to guarantee the perpetuity of the operation of equipment and installation in order to assure the maintain of the patrimony in a functional state. At CERN, such is the age of the civil engineering infrastructure and the relative technical equipment that urgent and appropriate consolidation programs shall be established. The big number of aged buildings and equipment entails that priorities are defined. This paper realizes a portrait of the actual situation and related problems, based on data extracted from D7i and inventories carried out by TS/FM group; at the same time it defines an interventions planning which optimizes safety aspects and maintenance costs. The timing of these interventions depends on the availability of specific resources.

  11. Succession planning and individual development.

    Science.gov (United States)

    Goudreau, Kelly A; Hardy, Jacalyn

    2006-06-01

    The authors present a framework for a succession planning and individual development initiative implemented in a Veterans Health Administration facility. Foundational strategic goals and a conceptual framework in the Veterans Affairs system provide the structure for the 3 facility-level succession planning and individual development programs. Outcomes of the programs are promising with 2 of 3 programs demonstrating clear succession planning outcomes and the other one showing positive preliminary results.

  12. Natural Family Planning: An Update

    OpenAIRE

    Derzko, Christine M.

    1986-01-01

    Natural Family Planning (NFP) is defined by the World Health Organization (WHO) as “methods for planning or avoiding pregnancies by observation of the natural signs and symptoms of the fertile and infertile phase of the menstrual cycle. It is implicit in the definition of natural family planning, when used to avoid conception that drugs, devices and surgical procedures are not used, there is abstinence from sexual intercourse during the fertile phase of the menstrual cycle, and the act of int...

  13. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  14. JCS planning: assessment and recommendations

    OpenAIRE

    Kropp, Rocky D.

    1989-01-01

    Approved for public release; distribution is unlimited Strategic planning by the Joint Chiefs of Staff (JCS) has been a source of criticism due to the lack of quality and timely military advice needed by the National Command Authorities (NCA). The 1986 Goldwater-Nichols Act made organizational changes to help solve JCS planning problems, but failed to address other fundamental problems such as the lack of Presidential participation in planning, the lack of recognition of strategic role of ...

  15. PLANNING CAREERS IN PUBLIC INSTITUTIONS

    OpenAIRE

    CÎRNU DORU

    2015-01-01

    Planning careers, in any organization, but especially in the public ones, is a process of great importance. Today, in modern society, there is virtually no person who does not need a public service provided by trained staff, helpful, kind and involved. By judiciously prepared career plans, public organizations develop their employees. As a result, the administrative career planning is currently one issue that do not admit any delay.

  16. PLANNING CAREERS IN PUBLIC INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2015-03-01

    Full Text Available Planning careers, in any organization, but especially in the public ones, is a process of great importance. Today, in modern society, there is virtually no person who does not need a public service provided by trained staff, helpful, kind and involved. By judiciously prepared career plans, public organizations develop their employees. As a result, the administrative career planning is currently one issue that do not admit any delay.

  17. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  18. Energetic Planning in Colombia

    International Nuclear Information System (INIS)

    In the country one of the most dynamic sectors in the last years, it has been the mining - energy sector that has had rates of increase superiors to 5%. The most critical situation corresponds to the sector of hydrocarbons, where the exploration in Colombia has arrived at its lower historical levels as they are those of 22 and 30 perforated wells, and 2148 and 2300 acquired kilometers of seismic 2d, in the years of 1996 and 1997, that which doesn't agree with the National Energy Plan NEP that inclined to perforate 100 exploratory wells per year, for the period 1997 - 2010, with the purpose of maintaining the production of 1.0 mbd starting from the year 2000 and this way to avoid that Colombia loses its self-sufficiency and be importer in the 2004 again. The oil politics in charge of the Ecopetrol, will have to be revised with different approaches if one wants a reactivation, because from 1989, year in that included the escalation clause, not alone it has not been possible to increase the exploration, but rather it has fallen at the mentioned levels. In the electric sector; the Regulation of Energy and Gas Commission - REGC, has been a supremely difficult to put priorities, because measures and immediate and urgent changes are needed. To medium term, Colombia should solve its institutional, normative problems and of infrastructure, to be able to have a true integral planning, that takes us to receive the next millennium with true energy self-sufficiency and a consolidation of the country in the export of coal and petroleum, if they take the necessary measures and avoid the lost of the self-sufficiency in hydrocarbons

  19. Marine oil spill contingency planning

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    According to the practice researching and formulating "The Oil Spill Contingency Plan of South Chinese Sea", this paper analyses and discusses the structure, functions and main contents of marine oil spill contingency planning, programs the organizing and commanding system and emergency response system, and advances the planning and researching method to coordinate comprehensively and to design practically the detailed emergency response steps until to formulate the ease operating programs for the plan implementation (PPI) and the PPI to apply high-techniques supporting emergency administrations and response.

  20. Planning with Partial Preference Models

    CERN Document Server

    Nguyen, Tuan; Gerevini, Alfonso; Serina, Ivan; Srivastava, Biplav; Kambhampati, Subbarao

    2011-01-01

    Current work in planning with preferences assume that the user's preference models are completely specified and aim to search for a single solution plan. In many real-world planning scenarios, however, the user probably cannot provide any information about her desired plans, or in some cases can only express partial preferences. In such situations, the planner has to present not only one but a set of plans to the user, with the hope that some of them are similar to the plan she prefers. We first propose the usage of different measures to capture quality of plan sets that are suitable for such scenarios: domain-independent distance measures defined based on plan elements (actions, states, causal links) if no knowledge of the user's preferences is given, and the Integrated Convex Preference measure in case the user's partial preference is provided. We then investigate various heuristic approaches to find set of plans according to these measures, and present empirical results demonstrating the promise of our app...

  1. Business Plan for a Restaurant

    OpenAIRE

    Shiyo, Angela; Keter, Noah

    2012-01-01

    The objective of this thesis is to develop a business plan for a restaurant named Ushanga in Eldoret Kenya that will focus on food services around the area. The main purpose of this study is to determine whether this business plan is viable and able to function as a normal restaurant. The business plan evaluates different features that are related to restaurant management. The intention is to obtain a broader picture of business planning in general and its particular parts. The author’s own l...

  2. Action Plan for Jobs 2012

    OpenAIRE

    2012-01-01

    The Action Plan for jobs provides the blueprint for action which aligns all Government departments and agencies around an enterprise growth and jobs objective. The plan contains over 270 actions to be implemented in 2012 by all 15 Government Departments as well as 36 State agencies. The publication of the Action Plan for Jobs marks the commencement of an annual process to produce an Action Plan focused on jobs and the enterprise economy. Forfás worked closely with the Minister for Jobs, Enter...

  3. Final Draft Strategic Marketing Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  4. Danish Municipal planning in Change

    DEFF Research Database (Denmark)

    Møller, Jørgen

    2003-01-01

    Danish municipal planning at the entrance to the 2000 years, where many things in the everyday of planning are changed after pressure from the market, the state, the municipal organisation, the investors, the citizens and the planners themselves. In this situation of change there may be good reason......The local authorities and the municipal planning are today under a considerable pressure of change. From a relatively practice-related approach this paper dicusses the turbulent situation characterizing the Danish municipal planning just now. The main idea of this paper is to describe and analyze...

  5. Security planning an applied approach

    CERN Document Server

    Lincke, Susan

    2015-01-01

    This book guides readers through building an IT security plan. Offering a template, it helps readers to prioritize risks, conform to regulation, plan their defense and secure proprietary/confidential information. The process is documented in the supplemental online security workbook. Security Planning is designed for the busy IT practitioner, who does not have time to become a security expert, but needs a security plan now. It also serves to educate the reader of a broader set of concepts related to the security environment through the Introductory Concepts and Advanced sections. The book serv

  6. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  7. Program and Evaluation Planning Lite: Planning in the Real World

    Science.gov (United States)

    Randolph, Justus J.; Eronen, Pasi J.

    2004-01-01

    Background: Although there are many high-quality models for program and evaluation planning, these models are often too intensive to be used in situations when time and resources are scarce. Additionally, there is little added value in using an elaborate and expensive program and evaluation planning procedure when programs are small or are planned…

  8. Data-Driven Planning: Using Assessment in Strategic Planning

    Science.gov (United States)

    Bresciani, Marilee J.

    2010-01-01

    Data-driven planning or evidence-based decision making represents nothing new in its concept. For years, business leaders have claimed they have implemented planning informed by data that have been strategically and systematically gathered. Within higher education and student affairs, there may be less evidence of the actual practice of…

  9. Program and Evaluation Planning Light: Planning in the Real World

    Directory of Open Access Journals (Sweden)

    Justus J. RANDOLPH

    2007-04-01

    Full Text Available Although there are many high-quality models for program and evaluation planning, these models are often too intensive to be used in situations when time and resources are scarce. Additionally, there is little added value in using an elaborate and expensive program and evaluation planning procedure when programs are small or are planned to be short-lived. To meet the need for simplified models for program and evaluation planning, we describe a model that includes only what we consider to be the most essential outcomes-based program and evaluation planning steps: (a how to create a logic model that shows how the program is causally expected to lead to outcomes, (b how to use the logic model to identify the goals and objectives that the program is responsible for; (c how to formulate measures, baselines, and targets from the goals and objectives; and (d how to construct program activities that align with program targets.

  10. Multicriteria optimization informed VMAT planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Huixiao; Craft, David L.; Gierga, David P., E-mail: dgierga@partners.org

    2014-04-01

    We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionation–treated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO

  11. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001

  12. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  13. Spatial planning of wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    This paper proposes guidelines for spatial planning for wind power, based on experience with spatial planning in Belgium, Denmark, France and the Netherlands. In addition experiences from Germany and Ireland have been used. This guidelines quotes all decisive criteria for successful implementation of wind energy: landscape integration, stakeholders involvement, noise and distance from buildings. (author)

  14. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  15. Maintenance Planning for Historic Buildings

    OpenAIRE

    Diana Plian; Dan Babor

    2008-01-01

    The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  16. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, Martin H.; Hahmann, Andrea N.; Nielsen, Torben S.;

    This poster presents the Public Service Obligation (PSO) funded project PSO 10464 "Integrated Wind Power Planning Tool". The project goal is to integrate a Numerical Weather Prediction (NWP) model with statistical tools in order to assess wind power fluctuations, with focus on short term...... forecasting for existing wind farms, as well as long term power system planning for future wind farms....

  17. Succession planning: securing the future.

    Science.gov (United States)

    Bolton, Julia; Roy, Wendy

    2004-12-01

    Succession planning is an essential business strategy for healthcare organizations, given the impending retirement of the huge Baby Boomer cohort of experienced nurses. It ensures that there will be qualified candidates when key vacancies occur. The authors describe the critical elements of a succession plan and suggest ways to implement them. The model can be applied to leadership and clinical positions.

  18. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  19. Planning als leerproces; een grondslagenonderzoek

    NARCIS (Netherlands)

    Kleefmann, F.

    1985-01-01

    "Planning as a learning process: a study of fundamentals" is the overall title of three publications by the author, which are a response to the demand for clarification of the principles underlying the task and function of planning within contempary social organization. The publications are:1. ACTIO

  20. Succession Planning for Library Instruction

    Science.gov (United States)

    Sobel, Karen; Drewry, Josiah

    2015-01-01

    Detailed succession planning helps libraries pass information from one employee to the next. This is crucial in preparing for hiring, turnover, retirements, training of graduate teaching assistants in academic libraries, and other common situations. The authors of this article discuss succession planning for instruction programs in academic…

  1. Lesson on Demand. Lesson Plan.

    Science.gov (United States)

    Weaver, Sue

    This lesson plan helps students understand the role consumer demand plays in the market system, i.e., how interactions in the marketplace help determine pricing. Students will participate in an activity that demonstrates the concepts of demand, demand schedule, demand curve, and the law of demand. The lesson plan provides student objectives;…

  2. Wanted: A World Development Plan

    NARCIS (Netherlands)

    J. Tinbergen (Jan)

    1968-01-01

    textabstractDevelopment planning has become a routine activity for large numbers of corporations as well as for public authorities at various levels, particularly national governments. In quite a few national planning agencies extensive analyses of the probable expansion of world supply and demand a

  3. Scenario Based Network Infrastructure Planning

    DEFF Research Database (Denmark)

    Knudsen, Thomas Phillip; Pedersen, Jens Myrup; Madsen, Ole Brun

    2005-01-01

    The paper presents a method for IT infrastructure planning that take into account very long term developments in usages. The method creates a scenario for a final, time independent stage in the planning process. The method abstracts relevant modelling factors from available information...

  4. San Diego's Capital Planning Process

    Science.gov (United States)

    Lytton, Michael

    2009-01-01

    This article describes San Diego's capital planning process. As part of its capital planning process, the San Diego Unified School District has developed a systematic analysis of functional quality at each of its school sites. The advantage of this approach is that it seeks to develop and apply quantifiable metrics and standards for the more…

  5. Personal Approaches to Career Planning.

    Science.gov (United States)

    DeMont, Billie; DeMont, Roger

    1983-01-01

    Identifies four approaches to career planning based on situational leadership theory: the network approach, self-help approach, engineering approach, and mentor approach. Guidelines for the selection of a planning method based on the nature of the work environment and personal preference are discussed. (JAC)

  6. Austin ISD. Integrated Lesson Plans.

    Science.gov (United States)

    East Texas State Univ., Commerce. Educational Development and Training Center.

    This packet contains 14 lesson plans for integrated academic and vocational education courses. Lesson plans for the following courses are included: integrated physics and principles of technology; algebra and principles of technology; principles of technology, language arts, and economics; physics and industrial electronics; physics and…

  7. Organization and planning of conferences

    International Nuclear Information System (INIS)

    The author uses as an example of conference planning The First International Topical Conference on Electron Beam Research and Technology which was held in Albuquerque, New Mexico, November 3-6, 1975. Guidelines are given through all phases of planning up to and during the meeting

  8. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  9. Graph Transformation and AI Planning

    NARCIS (Netherlands)

    Edelkamp, S.; Rensink, A.; Edelkamp, S.; Frank, J.

    2007-01-01

    This document provides insight to the similarities and differences of Graph Transformation and AI Planning, two rising research fields with different publication organs and tools. While graph transformation systems can be used as a graphical knowledge engineering front-end for designing planning pr

  10. The Birth of a Plan

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The formulation of the12th Five-Year Plan shows the operation of China’s public policy-making mechanism In March 2008,the National Development and Reform Committee (NDRC)began to evaluate the progress of the 11th Five-Year Plan for National Economic and Social Development

  11. Institutional Planning: A Systems Approach.

    Science.gov (United States)

    Adamson, Willie D.

    This four-chapter report explores the possible contributions of a systems approach to institutional planning. After introductory comments, Chapter I reviews the management theory of Henry Fayol, which emphasizes management tasks, such as planning, organizing, commanding, coordinating, and controlling, which are "universal" regardless of the level…

  12. Seismic safety research program plan

    International Nuclear Information System (INIS)

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  13. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  14. Integral multidisciplinary rehabilitation treatment planning

    NARCIS (Netherlands)

    Braaksma, A.; Kortbeek, Nikky; Post, Gerhard; Nollet, Frans

    2012-01-01

    This paper presents a methodology to plan treatments for rehabilitation outpatients. These patients require a series of treatments by therapists from various disciplines. In current practice, when treatments are planned, a lack of coordination between the different disciplines, along with a failure

  15. Integral multidisciplinary rehabilitation treatment planning

    NARCIS (Netherlands)

    Braaksma, A.; Kortbeek, N.; Post, G.F.; Nollet, F.

    2014-01-01

    This paper presents a methodology to plan treatments for rehabilitation outpatients. These patients require a series of treatments by therapists from various disciplines. In current practice, when treatments are planned, a lack of coordination between the different disciplines, along with a failure

  16. Linking Resource Decisions to Planning

    Science.gov (United States)

    Saunders, Laura

    2014-01-01

    This chapter explores the relationship between strategic planning and budgeting. It describes how community college leaders can use strategic and foundational plans (academic, facilities, technology, and financial) to drive budgets and resource allocations in support of institutional goals and objectives. Finally, it identifies challenges of doing…

  17. Virtual planning in orthognathic surgery.

    Science.gov (United States)

    Stokbro, K; Aagaard, E; Torkov, P; Bell, R B; Thygesen, T

    2014-08-01

    Numerous publications regarding virtual surgical planning protocols have been published, most reporting only one or two case reports to emphasize the hands-on planning. None have systematically reviewed the data published from clinical trials. This systematic review analyzes the precision and accuracy of three-dimensional (3D) virtual surgical planning of orthognathic procedures compared with the actual surgical outcome following orthognathic surgery reported in clinical trials. A systematic search of the current literature was conducted to identify clinical trials with a sample size of more than five patients, comparing the virtual surgical plan with the actual surgical outcome. Search terms revealed a total of 428 titles, out of which only seven articles were included, with a combined sample size of 149 patients. Data were presented in three different ways: intra-class correlation coefficient, 3D surface area with a difference planning appears to be an accurate and reproducible method for orthognathic treatment planning. A more uniform presentation of the data is necessary to allow the performance of a meta-analysis. Currently, the software system most often used for 3D virtual planning in clinical trials is SimPlant (Materialise). More independent clinical trials are needed to further validate the precision of virtual planning.

  18. Local Transport Policy and Planning

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    The Ph. D. thesis describes and analyses how environmental obejctives and strategies have materialised in the real-life context of local transport policies and plans, how environmental perspectives have been picked up by policy makers concerned with transport issues, how policy and planning...

  19. Strategic Planning Is an Oxymoron

    Science.gov (United States)

    Bassett, Patrick F.

    2012-01-01

    The thinking on "strategic thinking" has evolved significantly over the years. In the previous century, the independent school strategy was to focus on long-range planning, blithely projecting 10 years into the future. For decades this worked well enough, but in the late 20th century, independent schools shifted to "strategic planning," with its…

  20. Path planning in dynamic environments

    NARCIS (Netherlands)

    Berg, J.P. van den

    2007-01-01

    Path planning plays an important role in various fields of application, such as CAD design, computer games and virtual environments, molecular biology, and robotics. In its most general form, the path planning problem is formulated as finding a collision-free path for a moving entity between a start

  1. BRIEFING ABOUT SIMCORB BUSINESS PLAN

    Science.gov (United States)

    The SIMCorB Business Plan was discussed at the ORD Infrastructure Meeting held on July 17, 2000 in Washington, D.C.The briefing explained the purpose of the Plan as a vehicle to provide a road map to attain the ORD science IM vision. The road map includes defined milestones, bu...

  2. Strategic Audit and Marketing Plan

    Science.gov (United States)

    Wright, Lianna S.

    2013-01-01

    The purpose of this audit was to revise the marketing plan for ADSum Professional Development School and give the owner a long-term vision of the school to operate competitively in the crowded field of for-profit schools. It is fairly simple to create a strategic plan but harder to implement and execute. Execution requires weeks and months of…

  3. Severe Weather Planning for Schools

    Science.gov (United States)

    Watson, Barbara McNaught; Strong, Christopher; Bunting, Bill

    2008-01-01

    Flash floods, severe thunderstorms, and tornadoes occur with rapid onset and often no warning. Decisions must be made quickly and actions taken immediately. This paper provides tips for schools on: (1) Preparing for Severe Weather Emergencies; (2) Activating a Severe Weather Plan; (3) Severe Weather Plan Checklist; and (4) Periodic Drills and…

  4. Planning to Serve: Using Backwards Planning to Design Service-Learning Lesson Plans in the Preservice Curriculum

    Science.gov (United States)

    Stiler, Gary

    2009-01-01

    The author describes how the Understanding by Design (backwards planning) lesson plan format was used by his preservice K-12 students to develop service-learning lesson plans. Preservice teachers in a multicultural education course were given an assignment to develop service-learning lesson plans using the Understanding by Design planning process.…

  5. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  6. Sensitivities in Structural Maintenance Planning

    DEFF Research Database (Denmark)

    Faber, Michael Havbro; Kroon, I.B.; Sørensen, John Dalsgaard

    1996-01-01

    A general description of optimal inspection and maintenance planning based on the classical decision theory and the modern reliability theory is given. A number of simplifications to this description is given leading to more appropriate formulations for practical applications. Sensitivities of bo...... inspection and maintenance plans showing too large sensitivity. An example from the offshore industry is given to indicate how the methodologies can be used in practical applications.......A general description of optimal inspection and maintenance planning based on the classical decision theory and the modern reliability theory is given. A number of simplifications to this description is given leading to more appropriate formulations for practical applications. Sensitivities of both...... optimal inspection and maintenance plans as well as the associated costs are given with respect to the assumptions on which the planning has been performed. These sensitivities indicate the significance of the individual assumptions and may be used as a decision tool to reject particular optimal...

  7. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.;

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP......-Terrestrial Plan/the Plan) as the framework for coordinated, long-term Arctic terrestrial biodiversity monitoring. The goal of the CBMP-Terrestrial Plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect, understand and report on long...

  8. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  9. Danish Municipal Planning in Change

    DEFF Research Database (Denmark)

    Møller, Jørgen

    The local authorities and the municipal planning are today under a considerable pressure of change. From a relatively practice-related approach this paper discusses the turbulent situation characterizing the Danish municipal planning just now. The main data of this paper is to describe and analyze...... Danish municipal planning at the entrance to the 2000 years, where many things in the everyday of planning are changed after pressure from the market, the state, the municipal organisations, the investors, the citizens and the planners themselves. In this situation of change there may be good reasons...... to bear in mind what the basic task of physical planning at a local level has actually been and to discuss both what it is at the moment and what it can turn into in the future. The paper may actually raise more questions than it answers. The reason is that well-known political, administrative structures...

  10. Enterprise resource planning for hospitals.

    Science.gov (United States)

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes. PMID:15171978

  11. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  12. Draft Mission Plan Amendment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-09-01

    The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.

  13. Online Planning Algorithm

    Science.gov (United States)

    Rabideau, Gregg R.; Chien, Steve A.

    2010-01-01

    AVA v2 software selects goals for execution from a set of goals that oversubscribe shared resources. The term goal refers to a science or engineering request to execute a possibly complex command sequence, such as image targets or ground-station downlinks. Developed as an extension to the Virtual Machine Language (VML) execution system, the software enables onboard and remote goal triggering through the use of an embedded, dynamic goal set that can oversubscribe resources. From the set of conflicting goals, a subset must be chosen that maximizes a given quality metric, which in this case is strict priority selection. A goal can never be pre-empted by a lower priority goal, and high-level goals can be added, removed, or updated at any time, and the "best" goals will be selected for execution. The software addresses the issue of re-planning that must be performed in a short time frame by the embedded system where computational resources are constrained. In particular, the algorithm addresses problems with well-defined goal requests without temporal flexibility that oversubscribes available resources. By using a fast, incremental algorithm, goal selection can be postponed in a "just-in-time" fashion allowing requests to be changed or added at the last minute. Thereby enabling shorter response times and greater autonomy for the system under control.

  14. Draft Mission Plan Amendment

    International Nuclear Information System (INIS)

    The Department of Energy's Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation's spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs

  15. Visual Sample Plan

    Energy Technology Data Exchange (ETDEWEB)

    2007-10-25

    VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 5.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (98, NT, 2000, Millennium Edition, CE, and XP) Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem./rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for UXO identification.

  16. Grout Facilities standby plan

    International Nuclear Information System (INIS)

    This plan defines how the Grout Facilities will be deactivated to meet the intent of the recently renegotiated Tri-Party Agreement (TPA). The TPA calls for the use of the grout process as an emergency option only in the event that tank space is not available to resolve tank safety issues. The availability of new tanks is expected by 1997. Since a grout startup effort would take an estimated two years, a complete termination of the Grout Disposal Program is expected in December 1995. The former Tank Waste Remediation (TWRS) Strategy, adopted in 1988, called for the contents of Hanford's 28 newer double-shell waste tanks to be separated into high-level radioactive material to be vitrified and disposed of in a geologic repository; low-level wastes were to be sent to the Grout Facility to be made into a cement-like-mixture and poured into underground vaults at Hanford for disposal. The waste in the 149 older single-shell tanks (SST) were to undergo further study and analysis before a disposal decision was made

  17. Advanced Production Planning Models

    Energy Technology Data Exchange (ETDEWEB)

    JONES,DEAN A.; LAWTON,CRAIG R.; KJELDGAARD,EDWIN A.; WRIGHT,STEPHEN TROY; TURNQUIST,MARK A.; NOZICK,LINDA K.; LIST,GEORGE F.

    2000-12-01

    >This report describes the innovative modeling approach developed as a result of a 3-year Laboratory Directed Research and Development project. The overall goal of this project was to provide an effective suite of solvers for advanced production planning at facilities in the nuclear weapons complex (NWC). We focused our development activities on problems related to operations at the DOE's Pantex Plant. These types of scheduling problems appear in many contexts other than Pantex--both within the NWC (e.g., Neutron Generators) and in other commercial manufacturing settings. We successfully developed an innovative and effective solution strategy for these types of problems. We have tested this approach on actual data from Pantex, and from Org. 14000 (Neutron Generator production). This report focuses on the mathematical representation of the modeling approach and presents three representative studies using Pantex data. Results associated with the Neutron Generator facility will be published in a subsequent SAND report. The approach to task-based scheduling described here represents a significant addition to the literature for large-scale, realistic scheduling problems in a variety of production settings.

  18. Planning is the first step

    Energy Technology Data Exchange (ETDEWEB)

    Rees, S. [TransLink, Transportation Policy Program, Vancouver, BC (Canada)

    2001-07-01

    The process of planning for district energy systems is described in an effort to illustrate the contribution of energy planning to broader community goals; to provide an overview of community energy planning fundamentals; to review approaches and tools for community energy planning; and to help identify opportunities for district energy systems. Community energy planning incorporates energy goals in community plans and policies; uses energy tools and techniques to achieve other community goals; and it explicitly plans for both energy demand and energy supply in the community. Community energy planning also fosters energy efficiencies by purposefully shaping the built environment in consideration of energy production, distribution and use. Energy efficiency in turn is supportive of other social, economic and environmental goals. Overall, the benefits are reduced emissions; reduced capital and operating expenses; increased local economic activity; greater competitiveness; reduced infrastructure requirements; and improved livability. Community energy planning also provides opportunities for joint demand-side management programs; joint metering; joint corridor development, operation and maintenance; waste heat recovery; and district energy systems. Successful implementation of community energy planning requires a high level of commitment; staff education; regional cooperation; and inter-agency coordination. Some basic principles of CEP are emphasized. These are (1) adoption of a systems perspective, (2) focus on energy services, not on commodities, (3) full-cost accounting approach, (4) looking for synergies in the delivery of multiple services and multiple objectives, (5) optimizing the use of energy efficient technologies, (6) designing sustainability into the urban form, (7) optimizing use of existing and new infrastructure, (8) optimizing local supply, and (9) diversifying the resource base.

  19. Shot Planning and Analysis Tools

    Energy Technology Data Exchange (ETDEWEB)

    Casey, A; Beeler, R; Conder, A; Fallejo, R; Flegel, M; Hutton, M; Jancaitis, K; Lakamsani, V; Potter, D; Reisdorf, S; Tappero, J; Whitman, P; Carr, W; Liao, Z

    2011-07-25

    Shot planning and analysis tools (SPLAT) integrate components necessary to help achieve a high over-all operational efficiency of the National Ignition Facility (NIF) by combining near and long-term shot planning, final optics demand and supply loops, target diagnostics planning, and target fabrication requirements. Currently, the SPLAT project is comprised of two primary tool suites for shot planning and optics demand. The shot planning component provides a web-based interface to selecting and building a sequence of proposed shots for the NIF. These shot sequences, or 'lanes' as they are referred to by shot planners, provide for planning both near-term shots in the Facility and long-term 'campaigns' in the months and years to come. The shot planning capabilities integrate with the Configuration Management Tool (CMT) for experiment details and the NIF calendar for availability. Future enhancements will additionally integrate with target diagnostics planning and target fabrication requirements tools. The optics demand component is built upon predictive modelling of maintenance requirements on the final optics as a result of the proposed shots assembled during shot planning. The predictive models integrate energetics from a Laser Performance Operations Model (LPOM), the status of the deployed optics as provided by the online Final Optics Inspection system, and physics-based mathematical 'rules' that predict optic flaw growth and new flaw initiations. These models are then run on an analytical cluster comprised of forty-eight Linux-based compute nodes. Results from the predictive models are used to produce decision-support reports in the areas of optics inspection planning, optics maintenance exchanges, and optics beam blocker placement advisories. Over time, the SPLAT project will evolve to provide a variety of decision-support and operation optimization tools.

  20. 20 CFR 632.17 - Planning process.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Planning process. 632.17 Section 632.17... process. (a) Each Native American grantee shall establish a planning process for the development of its Master Plan and Comprehensive Annual Plan. This planning process shall involve consideration of the...

  1. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this...

  2. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility...

  3. Hopi Sustainable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  4. National transuranic program plan

    International Nuclear Information System (INIS)

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic wasteclose quotes. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial

  5. DIGITAL ARCHITECTURE PROJECT PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  6. Computational Planning in Facial Surgery.

    Science.gov (United States)

    Zachow, Stefan

    2015-10-01

    This article reflects the research of the last two decades in computational planning for cranio-maxillofacial surgery. Model-guided and computer-assisted surgery planning has tremendously developed due to ever increasing computational capabilities. Simulators for education, planning, and training of surgery are often compared with flight simulators, where maneuvers are also trained to reduce a possible risk of failure. Meanwhile, digital patient models can be derived from medical image data with astonishing accuracy and thus can serve for model surgery to derive a surgical template model that represents the envisaged result. Computerized surgical planning approaches, however, are often still explorative, meaning that a surgeon tries to find a therapeutic concept based on his or her expertise using computational tools that are mimicking real procedures. Future perspectives of an improved computerized planning may be that surgical objectives will be generated algorithmically by employing mathematical modeling, simulation, and optimization techniques. Planning systems thus act as intelligent decision support systems. However, surgeons can still use the existing tools to vary the proposed approach, but they mainly focus on how to transfer objectives into reality. Such a development may result in a paradigm shift for future surgery planning. PMID:26579861

  7. Flight Planning in the Cloud

    Science.gov (United States)

    Flores, Sarah L.; Chapman, Bruce D.; Tung, Waye W.; Zheng, Yang

    2011-01-01

    This new interface will enable Principal Investigators (PIs), as well as UAVSAR (Uninhabited Aerial Vehicle Synthetic Aperture Radar) members to do their own flight planning and time estimation without having to request flight lines through the science coordinator. It uses an all-in-one Google Maps interface, a JPL hosted database, and PI flight requirements to design an airborne flight plan. The application will enable users to see their own flight plan being constructed interactively through a map interface, and then the flight planning software will generate all the files necessary for the flight. Afterward, the UAVSAR team can then complete the flight request, including calendaring and supplying requisite flight request files in the expected format for processing by NASA s airborne science program. Some of the main features of the interface include drawing flight lines on the map, nudging them, adding them to the current flight plan, and reordering them. The user can also search and select takeoff, landing, and intermediate airports. As the flight plan is constructed, all of its components are constantly being saved to the database, and the estimated flight times are updated. Another feature is the ability to import flight lines from previously saved flight plans. One of the main motivations was to make this Web application as simple and intuitive as possible, while also being dynamic and robust. This Web application can easily be extended to support other airborne instruments.

  8. Computational Aspects of Reordering Plans

    CERN Document Server

    Backstrom, C

    2011-01-01

    This article studies the problem of modifying the action ordering of a plan in order to optimise the plan according to various criteria. One of these criteria is to make a plan less constrained and the other is to minimize its parallel execution time. Three candidate definitions are proposed for the first of these criteria, constituting a sequence of increasing optimality guarantees. Two of these are based on deordering plans, which means that ordering relations may only be removed, not added, while the third one uses reordering, where arbitrary modifications to the ordering are allowed. It is shown that only the weakest one of the three criteria is tractable to achieve, the other two being NP-hard and even difficult to approximate. Similarly, optimising the parallel execution time of a plan is studied both for deordering and reordering of plans. In the general case, both of these computations are NP-hard. However, it is shown that optimal deorderings can be computed in polynomial time for a class of planning...

  9. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth;

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  10. Aspects of Integrated Planning in the Planning System of Lithuania

    OpenAIRE

    Jonas Jakaitis

    2011-01-01

    The article reveals subjects of foster systems of management and implementation of integrated planning in Lithuania that are widely discussed in the world. Coherence of planning is the basis for sustainable territorial development. The aspect of quality of life, vitality and sustain-ability of local communities is equally important for Lithuania as well as all European Community, thus empowering citizens to equally use the benefits of their land of residence.Article in Lithuanian

  11. Long range planning at NASA

    Science.gov (United States)

    Bekey, Ivan

    1987-01-01

    NASA's current plans for the U.S. space program are described. Consideration is given to the debate between manned or unmanned exploration of space, missions to the moon versus missions to Mars, and the exploration of space applications or science. NASA has created the Office of Policy and Planning and the Office of Exploration in order to improve the planning of future space activities. Long-range trends such as second-generation Shuttles, cargo launch vehicles with large capacity systems, an advanced Space Station, the use of robotics, closed cycle life support, health maintenance techniques, and the processing of extraterrestrial materials are considered.

  12. Proactive Approach to Manufacturing Planning

    Directory of Open Access Journals (Sweden)

    Peter Bubeník

    2014-07-01

    Full Text Available Proposed concept of proactive manufacturing planning uses sets of knowledge to create plan. These sets of knowledge are gained from transformation of historical data of selected indicators. This concept uses the analysis of occurred events, which is done by applying data mining methods to known historical data. Results of analysis are then recorded into knowledge-based system for further use. Application of data mining techniques helps to find hidden relationships with high influence on final decision of planner. This concept aims to navigate planner during creation of real plans resulting from real situations. Unknown situations are modelled using simulation module. 

  13. Public deliberation in municipal planning

    DEFF Research Database (Denmark)

    Bohøj, Morten; Borchorst, Nikolaj Gandrup; Bødker, Susanne;

    2011-01-01

    This paper reports on an exploratory participatory design process aimed at supporting citizen deliberation in municipal planning. It presents the main outcomes of this process in terms of selected prototypes and an approach to the use setting. We support and discuss different ways for citizens...... to act and reflect on proposed plans: in-situ, while physically close to the planning object, and ex-situ, when citizens are remote from this. The support of in-situ and ex-situ participation allows citizens to engage in continuous reflection-in and on-action as a collaborative activity with other...

  14. PFP dangerous waste training plan

    International Nuclear Information System (INIS)

    This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual

  15. Approval plans issues and innovations

    CERN Document Server

    Katz, Linda S

    2013-01-01

    How can you, as an acquisition librarians, keep current on the output of hundreds of publishers? The answer, of course, is that you cannot. For over 30 years, approval plans have been used by librarians to acquire current titles, save staff time, and build core collections. Even today, these reasons seem appropriate, as libraries try to maintain up-to-date collections and control personnel and operating budgets. However, as shown in Approval Plans: Issues and Innovations, the use of approval plans is not so simple and straightforward; their use is subject to complex procedures and policies--an

  16. Columbia River Impact Evaluation Plan

    International Nuclear Information System (INIS)

    A preliminary impact evaluation was conducted to assess the adequacy of existing data and proposed data collection programs for evaluating cumulative health and environmental impacts to the Columbia River due to past practices at the Hanford Site. The results of this evaluation were used to develop this plan to ensure collection of sufficient data for adequate characterization of the Columbia River along the 100 Area for CERCLA purposes. The evaluation used to develop the plan is not a risk assessment; the plan presented here is only a mechanism to collect additional data to support a future risk assessment

  17. System i Disaster Recovery Planning

    CERN Document Server

    Dolewski, Richard

    2008-01-01

    Mapping out all the preparations necessary for an effective disaster recovery plan and its safeguard-a continuous maintenance program-this guide is aimed at IT managers of small and medium businesses. The opening section covers the initial steps of auditing vulnerability, ranking essential IT functions, and reviewing the storage of tape backups, with the following discussion focused on the elements of the plan itself. The plan includes a mission statement, a definition of disaster, the assignment of staff to teams, methods of compensating for human error, and standards for documenting the step

  18. Non-cooperative planning theory

    CERN Document Server

    Bogetoft, Peter

    1994-01-01

    Planning in a general sense is concerned with the design of communication and decision making mechanisms in organizations where information and choice are decentralized. Non-cooperative planning theory as it is developed in this book treats the incentive aspects hereof. It stresses how strategic behavior and opportunism may impede planning, and how this can be coped with via the organization of communication and decision making, the design of information and control systems, and the development of incentive schemes. In particular, the book contains a thorough investigation of incentive provision in information production.

  19. Transformative Dynamics in Detailed Planning

    DEFF Research Database (Denmark)

    Quitzau, Maj-Britt; Poulsen, Naja; Gustavsson, Ted;

    that the translation process relies heavily on integration of impositions in the detailed plan, although this has clear limitations, since some sustainable strategies are more difficult to impose than others. It also shows how strategic navigation may represent an alternative translation strategy to promote more...... difficult sustainable strategies that address the project design more directly. In conclusion, the paper argues that strategic navigation represents a stronger mediator of change compared to the detailed plan, but that especially timing issues in the coordination between formal planning and design processes...

  20. Work through the valley: plan.

    Science.gov (United States)

    Jones, Loretta; Meade, Barbara; Koegel, Paul; Lucas-Wright, Aziza; Young-Brinn, Angela; Terry, Chrystene; Norris, Keith

    2009-01-01

    This first of three chapters on the Valley stage, or main work of a Community-Partnered Participatory Research (CPPR) initiative, concerns the planning phase of the work cycle. The main goal of this phase is to develop an action plan, which clarifies the goals, methods, responsible individuals, and timeline for doing the work. Further, this chapter reviews approaches, such as creativity and use of humor, that help level the playing field and assure community co-leadership with academic partners in developing effective action plans.

  1. Machine learning methods for planning

    CERN Document Server

    Minton, Steven

    1993-01-01

    Machine Learning Methods for Planning provides information pertinent to learning methods for planning and scheduling. This book covers a wide variety of learning methods and learning architectures, including analogical, case-based, decision-tree, explanation-based, and reinforcement learning.Organized into 15 chapters, this book begins with an overview of planning and scheduling and describes some representative learning systems that have been developed for these tasks. This text then describes a learning apprentice for calendar management. Other chapters consider the problem of temporal credi

  2. Seismic safety research program plan

    International Nuclear Information System (INIS)

    This document presents a plan for seismic research to be performed by the Structural and Seismic Engineering Branch in the Office of Nuclear Regulatory Research. The plan describes the regulatory needs and related research necessary to address the following issues: uncertainties in seismic hazard, earthquakes larger than the design basis, seismic vulnerabilities, shifts in building frequency, piping design, and the adequacy of current criteria and methods. In addition to presenting current and proposed research within the NRC, the plan discusses research sponsored by other domestic and foreign sources

  3. TERRITORIAL NETWORKS AND PLANNING: LAND PLANNING IN METROPOLITAN BILBAO

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2011-05-01

    Full Text Available The present article argues that the territorial planning is nowadays fundamental instrument to the definition of strategic areas of opportunity, and also, articulating instrument of distinct territory scales (from local to regional. It is restored the importance of distinct levels of planning, listed in chain, of a more general level of regional coverage to specific and local levels. It is demonstrated the importance of this articulation not only for dealing with urgencies in the intra-urban territory ordering to promote the compact city, but also, to develop cities and regions, enhancing the implementation of decentralized and solidary supply chains that characterize a network organization. It is proposed that, the planning instruments and strategic ordering of the territory, aimed at decentralization and creation of new towns or focusing on the redevelopment and recycling of uses and activities in cities and regions in decline with degraded areas, allowing decisions of strategic importance that determine lines, axes and opportunity areas, targets of economic, and social development, and therefore it starts to concentrate investment in infrastructure, serving to enhance the implementation of urban network centers and supply chains, which benefits with the larger planning of urban and regional territory. Because of it, the analysis object is the strategic territorial planning that has been developed and implemented specifically in Spain, underlying plans and actions of urban regeneration, as exemplified by the process is still ongoing in the city of Bilbao, the region north of the country.

  4. Regional energy planning through SWOT analysis and strategic planning tools.

    Energy Technology Data Exchange (ETDEWEB)

    Terrados, J.; Almonacid, G.; Hontoria, L. [Research Group IDEA, Polytechnics School, Campus Las Lagunillas, Edificio A3, University of Jaen, 23071 Jaen (Spain)

    2007-08-15

    Strategic planning processes, which are commonly used as a tool for region development and territorial structuring, can be harnessed by politicians and public administrations, at the local level, to redesign the regional energy system and encourage renewable energy development and environmental preservation. In this sense, the province of Jaen, a southern Spanish region whose economy is mainly based on olive agriculture, has carried out its strategic plan aiming at a major socioeconomic development. Under the leadership of the provincial government and the University of Jaen, main provincial institutions joined to propose the elaboration of a participatory strategic plan for the whole province. Here, the elaboration of the energy part of the plan, which was directly focused on the exploitation of renewable resources, mainly solar and biomass energy, and which highlights the effectiveness of techniques from business management applied to a sustainable energy model design is presented. Renewable Energy development during the first years of plan execution is presented, and the impact of additional issues is discussed. It is concluded that, although multicriteria decision-making technologies (MCDA) are extensively used in energy planning, a different approach can be utilized to incorporate techniques from strategic analysis. Furthermore, SWOT (strengths, weaknesses, opportunities and threats) analysis has proved to be an effective tool and has constituted a suitable baseline to diagnose current problems and to sketch future action lines. (author)

  5. Communications Contingency Plan: Planning for Crises and Controversy. Phase 1

    Science.gov (United States)

    Treise, Deborah; Bernstein, Arla G.; Yates, Brad

    1998-01-01

    Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

  6. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    Energy Technology Data Exchange (ETDEWEB)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie [Duke Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 and Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  7. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  8. What to include in your birth plan

    Science.gov (United States)

    Pregnancy - birth plan ... Birth plans are guides that parents-to-be make to help their health care providers best support them during ... things to consider before you make a birth plan. This is a great time to learn about ...

  9. Annual Water Management Plan, Part I

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  10. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  11. Students win national financial planning contest

    OpenAIRE

    Sutphin, Michael D.

    2007-01-01

    Three Virginia Tech students studying financial planning have won the 2007 Ameriprise Financial Planning Invitational, bringing home $10,000 in scholarship money to support the financial planning program in the College of Agriculture and Life Sciences.

  12. Annual water management plan 1998-1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  13. Annual water management plan 1996-1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  14. Annual water management plan - 1993-1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  15. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  16. Annual water management plan 1995-1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  17. A Framework for Healthcare Planning and Control

    NARCIS (Netherlands)

    Hans, Erwin W.; Houdenhoven, van Mark; Hulshof, Peter J.H.; Hall, Randolph

    2012-01-01

    Rising expenditures spur healthcare organizations to organize their processes more efficiently and effectively. Unfortunately, healthcare planning and control lags behind manufacturing planning and control. We analyze existing planning and control concepts or frameworks for healthcare operations man

  18. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  19. 36 CFR 219.31 - Maintenance of the plan and planning records.

    Science.gov (United States)

    2010-07-01

    ... planning records. 219.31 Section 219.31 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Planning Documentation § 219.31 Maintenance of the plan and planning records. (a) Each National Forest or Grassland...

  20. Strategic Planning, Operational Planning, and Measures of Effectiveness: An Integrated Model.

    Science.gov (United States)

    Donsky, Aaron P.

    While various paradigms exist for planning in two-year colleges, from master planning to quality circles, three major elements invariably appear in planning activities: strategic or formal planning, operational planning, and effectiveness measures. Strategic planning attempts to systematically assess an institution's relationship with its external…