With the lifting of the top dome of the Windscale (AGR) Advanced Gas-cooled Reactor earlier this year, the decommissioning team has begun to dismantle the heaviest of the reactor components. In defining the tasks involved, the most important criterion was to minimise the radiation exposure expected to be received by the team members. The manager of the WAGRdecommissioningproject describes the preparation undertaken and the final lifting of the top dome in this article. (author).
This report is based on a study carried out by the NEA Decommissioning Cost Estimation Group (DCEG) on decommissioning cost elements, estimation practices and reporting requirements. Its findings indicate that cost methodologies need to be updated continuously using cost data from actual decommissioningprojects and hence, systematic approaches need to be implemented to collect these data. The study also concludes that changes in project scope may have the greatest impact on project costs. Such changes must therefore be identified immediately and incorporated into the estimate. Finally, the report notes that more needs to be done to facilitate the comparison of estimates, for example by providing a reporting template for national estimates. (authors)
Argonne National Laboratory (ANL) is implementing waste minimization and pollution prevention activities into its conduct of decontamination and decommissioning (D&D) projects. Many of these activities are rather straight forward and simple approaches, yet they are often overlooked and not implemented as often as they should or could be. Specific activities involving recycling and reuse of materials and structures, which have proven useful in lowering decommissioning and disposal costs on D&D projects at ANL are presented.
This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioningprojects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of ...
This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioningprojects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of ...
The decommissioning of the Sodium Reactor Experiment is essentially complete. Contaminated materials, equipment, and soil were removed, decreasing the residual radioactivity to levels acceptable for future unrestricted use of the site. The fuel was removed and declad, tooling and techniques to support the decommissioning were developed, bulk sodium and residual sodium films were removed, coolant systems were dismantled, the reactor vessel was dissected, the interior surfaces of the facilities were decontaminated, and waste materials were packaged and shipped to burial sites. Radiation exposure to workers and the public was within the guidelines and as low as reasonably achievable. In performing the project, new decontamination techniques were tested, decontamination equipment was evaluated, and waste disposal methods were developed.
The decommissioning of windscale Pile 2 Chimney resulted in the removal of one of most historically significant and prominent features of the Sellafield site. The project was the first large scale concrete ''free release'' operation to be undertaken on the Sellafield nuclear site, producing 4500 tons of concrete of which 3000 tons was demonstrated to be ''free release''. The paper describes the radiometric techniques employed in the characterisation and segregation of the concrete into low level waste (LLW), very low level waste (VLLW) and free release categories. It examines the robust solutions that were developed to meet the technical and regulatory challenges of the project, which included the definition of free release, the selection of averaging volumes, the testing and validation of the monitoring systems employed for ton quantities of concrete and the identification and removal of small numbers of fuel particles ...
The purpose is to describe problems associated with the establishment of vegetation on mined lands and practical rehabilitation and restoration methods for establishing a rehabilitation plan. Land disturbed by mining should be restored to its original state, when the mine is decommissioned, but before that can be attained, site problems such as toxicity, moisture supply, and texture must be rectified. The land may need to pass through several conditioning stages, and links need to be formed to maintain a functioning ecosystem. A key aspect to rehabilitation is the need to increase the organic matter content of the substrate. This improves soil structure, increases the moisture holding ability, and provides a pool for nutrient cycling. 11 refs., 2 tabs.
With major D&D projects ongoing or being planned, and also with the daily management of radwaste from nuclear facilities, the potential role of transport packagings has often been overlooked: here will one rely essentially on drums, there several local waste processing units are built, elsewhere decommissioned facilities are cut in small bits to fit into small containers by far less efficient. The present paper proposes to illustrate how integrating a transport system from the start may influence operational choices of waste management.
This document presents the SSI preliminary views and position concerning the decommissioning of nuclear plants. To prevent the exposure of the decommissioning personnel and the general public to unacceptable levels of radiation and to protect the environment and future generations, it is SSI`s task to formulate and issue the necessary terms and regulations with which the reactor licensees must comply during the decommissioning work. The views and principles presented here are the basis of SSI`s continued work on guidelines and regulations for the decommissioning of nuclear plants.
The Institute of Energetic and Nuclear Research - IPEN is a research and development institution, located in a densely populated area, in the city of Sao Paulo. The nuclear fuel cycle was developed from the Yellow Cake to the enrichment and reconversion at IPEN. After this phase, all the technology was transferred to private enterprises and to the Brazilian Navy (CTM/SP). Some plants of the fuel cycle were at semi-industrial level, with a production over 20 kg/h. As a research institute, IPEN accomplished its function of the fuel cycle, developing and transferring technology. With the necessity of space for the implementation of new projects, the uranium hexafluoride (UF{sub 6}) production plant was chosen, since it had been idle for many years and presented potential leaking risks, which could cause environmental aggression and serious accidents. This plant decommission required accurate planning, as this work had not been carried out in ...
As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was ...
In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioningprojects. It has been used by the DPAD (Decontamination and Dismantling ...
All the tests have been finished up in the Waste Management and Disposal Facility which has been used for the safety tests of solidified radioactive waste on sea dumping disposal. The decommissioning of this facility was performed for use of radioisotopes. This report describes the plan on decommissioning of facility for use of radioisotopes, the contamination checking methods and measurement of radioactivity, the fore case and practice for amount of generated radioactive wastes, the operation procedures for dismantlement, the safety measures, the expenses for decommissioning and so on. (author)
The UK Pipelines Safety Regulations require the pipeline operator to ensure that a pipeline, once decommissioned, does not become a source of danger. Elsewhere, Regulatory Authorities require consideration of the possible issues which pipeline decommissioning may raise. This paper considers current practice with respect to pipeline decommissioning and abandonment, and sets out the range of factors which the operator must take into account. (author)
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.
Explosives have rarely been used in decommissioning of nuclear reactors. Nevertheless, controlled blasting can be used advantageously during careful destruction of nuclear power plants for removal of concrete, pipe systems, and other components. Experiments performed within a former nuclear power plant demonstrate the feasibility of this method, employing explosive masses up to 15 kg per blast. The loadings of the components and the total plant structure were measured and compared with code predictions. The experiments show a response of the containment predominantly in frequency ranges above 100 Hz, thus keeping the building and components below German regulation limits for shock excitation. The blast wave pressures are reduced drastically within short distances in the building. Dust and debris can be contained with simple methods such as curtains. Use of this method seems to be applicable to actual dismantling projects.
Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with ...
There is now an acute need to optimize maintenance to improve both reliability and competitiveness of nuclear power plant operation. There is an increasing tendency to move from the preventive (time based) maintenance concept to one dependent on plant and component conditions. In this context, various on-line and off-line condition monitoring and diagnostics, nondestructive inspection techniques and surveillance are used. Component selection for condition based maintenance, parameter selection for monitoring condition, evaluation of condition monitoring results are issues influencing the effectiveness of condition based maintenance. All these selections of components and parameters to be monitored, monitoring and diagnostics techniques to be used, acceptance criteria and trending for condition evaluation, and the economic aspect of predictive maintenance and condition monitoring should be incorporated into an integrated, effective condition based maintenance programme, which is part of ...
Following a referendum in Italy in 1987, the four Nuclear Power Plants (NPPs) owned and operated by the state utility ENEL were closed. After closing the NPPs, ENEL selected a ''safestore'' decommissioning strategy; anticipating a safestore period of some 40-50 years. This approach was consistent with the funds collected during plant operation, and was reinforced by the lack of both a waste repository and a set of national free release limits for contaminated materials in Italy. During 1999, twin decisions were made to privatize ENEL and to transform the nuclear division into a separate subsidiary of the ENEL group. This group was renamed Sogin and during the following year, ownership of the company was transferred to the Italian Treasury. On formation, Sogin was asked by the Italian government to review the national decommissioning strategy. The objective of the review was to move from a safestore strategy ...
This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary mission at the WVDP is to ...
With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.
The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted waste monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the ...
In the future even more than in the past, nuclear power will be indispensable in the present industrialized countries and in those still under development. The safe, nonpolluting, and economic supply of energy to mankind in the future includes so many different problems that the technology of the high-temperature reactor at its present level of development, and with the possibilities is offers above and beyond those provided by other, established, technologies, does not have to mark the end of some old line of development, but rather should be seen as the starting point of a development offering promise for the future. It is for this very reason that the extensive, valuable knowledge and experience accumulated in the construction, operation, and decommissioning of the AVR and THTR plants, the development of the HTR module and other variants and, last, but not least, the valuable results of projects such as PNP, NFE, and HHT, must be preserved ...
EOS Technologies has been commissioned to design and build a unique 2.4m astronomical telescope for the Magdalena Ridge Observatory. This telescope utilizes a high quality primary mirror and cell from a now decommissioned military application. This paper describes the project and gives an overview of the telescope design. The Magdalena Ridge Observatory (MRO) 2.4 meter telescope will be primarily utilized to observe, track, and characterize solar system astronomical targets, Earth satellites, space vehicles, and terrestrial military targets. The telescope's rapid tracking (slew rates are 10o/sec) will allow it to move to any target and acquire data within one minute of receipt of notice. In this way, the telescope will be used to capitalize on targets of opportunity that occur in asteroid studies (e.g., Near Earth Objects) and in astrophysics, such as gamma ray bursts and other transient phenomena. Planned instrumentation includes a CCD imager, ...
The authors have led development of a Standard Guide for Residential Green Buildings through the consensus process of the American Society for Testing and Materials (ASTM). The voluntary guidance document has been processed through two public peer reviews in ASTM`s E-50.06 sub-committee on the environment. The guide`s purpose is to present general criteria for home builders, residential designers and developers on how to systematically approach the creation of a green home--from the design phase on through to eventual de-commissioning of residential structures. This paper briefly reviews the standards process, includes an overview of the Standard Guides` principal criteria, and provides a robust resource listing for further investigation by readers. During development of the Standard Guide, authors emphasized thorough review of the available literature on sustainable residential development. This was then reflected in the technical contents of the Standard Guide to ...
The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is ...
The U.S. Department of Energy's (DOE) Savannah River Site (SRS) is decommissioning many of its excess facilities through removal of the facility structures leaving only the concrete-slab foundations in place. Site-specific, risk-based derived concentration guideline levels (DCGLs) for radionuclides have been determined for a future industrial worker potentially exposed to residual contamination on these concrete slabs as described in Jannik. These risk-based DCGLs were estimated for an exposure area of 100 m2. During deactivation and decommissioning (D and D) operations at SRS, the need for area factors for larger and smaller contaminated areas arose. This paper compares the area factors determined for an industrial worker exposed to a concrete slab end-state for several radionuclides of concern at SRS with 1) the illustrative area factors provided in MARSSIM, 2) the area correction factors provided in the U.S. Environmental Protection Agency's ...
The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry
The Systems Design Study (SDS) identified technologies available for the remediation of low-level and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the Idaho National Engineering Laboratory. The SDS study intentionally omitted the costs of transportation and disposal of the processed waste and the cost of decommissioning the processing facility. This report provides a follow-on analysis of the SDS to explore the basis for life-cycle cost segments of transportation, disposal, and facility decommissioning; to determine the sensitivity of the cost segments; and to quantify the life-cycle costs of the 10 ex situ concepts of the Systems Design Study.
The Systems Design Study (SDS) identified technologies available for the remediation of low-level and transuranic waste stored at the Radioactive Waste Management Complex`s Subsurface Disposal Area at the Idaho National Engineering Laboratory. The SDS study intentionally omitted the costs of transportation and disposal of the processed waste and the cost of decommissioning the processing facility. This report provides a follow-on analysis of the SDS to explore the basis for life-cycle cost segments of transportation, disposal, and facility decommissioning; to determine the sensitivity of the cost segments; and to quantify the life-cycle costs of the 10 ex situ concepts of the Systems Design Study.
SX Holdings Limited intends to establish a rare earths plant at Port Pirie, South Australia. The proposal involves three stages of development, Stage 3 being to develop a monazite cracking plant and associated rare earths separation facility with the capacity to process up to 8,000 t/a of monazite-type ores. The proposed initial capacity is 4,000 t/a. This Draft Environmental Impact Statement relates to Stage 3 and is based on a monazite processing capacity of 8,000 t/a. The justification of the project is given in terms of use and the market for rare earths, the economic and environmental benefits of the proposal, the site selection process, site rehabilitation, and the consequences of not proceeding. A detailed description of the project is given, including the treatment process, site development and facilities, the supply of raw materials, product and waste handling, transport and storage, plant commissioning, operation and ...
The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D&D) facilities. Although this method has been developed for D&D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D&D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the ...
The days of high-temperature reactors in the Federal Republic of Germany are numbered. The AVR has been decommissioned, and an application has been filed for licensing the decommissioning of the THTR. Nevertheless, Prof. Dr. Rudolf Schulten who is the director of Juelich Nuclear Research Center's Institute for Reactor Development, and also full professor of Aachen Technical University in the field of reactor safety, predicts a good future for the HTR reactor line on a worldwide level, due to the inherent safety of this reactor type. (orig.).
The primary purpose of the Rocky Flats Field Office of the US Department of Energy is to decommission the entire plant. In an effort to improve the basis and the accuracy of the future decommissioning cost, Rocky Flats has developed a powerful but easy-to-use tool to determine budget cost estimates to characterize, decontaminate, and demolish all its buildings. The parametric cost-estimating tool is called the Facilities Disposition Cost Model (FDCM).
This report discusses a desk-top computer program has been developed for estimating the costs, waste volumes, and occupational radiation exposures associated with decommissioning light-water reactor power stations. Cost categories and cost algorithms used in the program are discussed and a brief description of the user interface is given.
Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 cubic meters (850,000 ...
Significant environmental issues and regulatory proceedings in Alberta were discussed. The Mackenzie Valley Pipeline Project was reviewed in relation to the Deh Cho First Nation's advanced actions in the federal court to enjoin the review panel from proceeding with the review process. The Deh Cho First Nation is seeking a declaration that the plan violates their rights under the Canadian Charter of Rights and Freedoms and the Constitution Act. Various regulatory and government agencies have now developed a plan to coordinate their different regulatory processes and approvals in the Cooperation Plan for the Environmental Impact Assessment and Regulatory Review of the Northern Gas Pipeline project. The Deh Cho allege that they were not afforded the opportunity to participate in the development and implementation of the plan. A review panel plans to proceed once the environmental and social impacts are determined, and the consortiums plan ...
The SIEN 2009 symposium organized by Romanian Nuclear Energy Association, AREN, in co-operation with Romanian Atomic Forum, ROMATOM, was primarily targeting the expert community involved in developing new nuclear power projects and implementing the National Nuclear Program. The symposium was also open as a discussion and information forum for scientists, engineers, technicians and students interested in scientific and technologic topics of Nuclear Power. It was structured in the following 6 sections: - Nuclear new builds and developments; - Operation, inspection and maintenance; - Increasing nuclear safety features; - Fuel cycle and decommissioning; - Public perception and confidence strengthening; - Environmental management. The symposium began with three plenary lectures dealing with: - Sustainable Nuclear Energy European Technology Platform; - Nuclear new-build; - Current issues of nuclear equipment standardization in Romania. A poster ...
More important than waste generation numbers, the pollution prevention and waste minimization successes achieved at Hanford in 1993 have reduced waste and improved operations at the Site. Just a few of these projects are: A small research nuclear reactor, unused and destined for disposal as low level radioactive waste, was provided to a Texas University for their nuclear research program, avoiding 25 cubic meters of waste and saving $116,000. By changing the slope on a asphalt lot in front of a waste storage pad, run-off rainwater was prevented from becoming mixed low level waste water, preventing 40 cubic meters of waste and saving $750,000. Through more efficient electrostatic paint spraying equipment and a solvent recovery system, a paint shop reduced hazardous waste by 3,500 kilograms, saving $90,800. During the demolition of a large decommissioned building, more than 90% of the building's material was recycled by crushing the concrete for ...
The South White Rose oilfield, offshore Newfoundland, owned jointly by Husky Oil (82.5 per cent ) and Petro-Canada (17.5 per cent) is being developed using a floating production storage and offloading (FPSO) system. Some industry stakeholders claim that the oil should be produced using a concrete gravity base system as used in the Hibernia Field. However, Husky Oil officials are confident that the choice of the FPSO is well justified, based on its cost effectiveness and economic viability. Several production facility options have been assessed, taking into account feasibility, deliverability, economic attributes. risk and safety . The assessment results clearly pointed to FPSO as the preferred system based on its commercial and technical flexibility, proven track record in harsh environments, its ability to produce both oil and gas in sequential development, its promise of production at full capacity earlier than a gravity base system, and easier decommissioning ...
The calculated radioactive waste inventories of the Turkey Point pressurized water fission reactor (PWR) and the Starfire conceptual fusion tokamak are compared as a function of time from initial start-up to 10,000 years after decommissioning. Only materi...
The main problems arising in decommissioning nuclear-powered submarines (NPS) relate to choosing a concept of handling reactor compartments followed by handling technology development. Reactor compartments (RC) are characterized with extremely space-saving or integral layout of large-size power equipment and systems, restricted access for dismantling, high radiation dose rates in a number of bays of RC. The above RC features pose a problem to find optimum option of RC utilization which on the one hand would be the most cost efficient, and the safest as possible on the other, i.e. dose commitments of personnel involved should be minimum, and effect on population and environment should be negligible. The main radiation factors specifying safety in RC handling at any decommissioning stage are as follows: (1) total radioactivity integrated in reactor facility (RF); (2) distribution of this radioactivity through RF equipment and structures; (3) ...
The NATO Advanced Research Workshop on Nuclear Submarine Decommissioning and Related Problems was held in Moscow June 19--22, 1995. It was preceded by a visit to the Zvezdotchka Shipyard at Severodvinsk, a repair and maintenance yard for Russian nuclear submarines, for a subgroup of the workshop attendees. Most of the material in this paper is drawn directly form the workshop proceedings. Slightly less than 500 nuclear ships and submarines (the vast majority are submarines) have been constructed by the countries with nuclear navies. This includes approximately 250 by Russia, 195 by the United States, 23 by the United Kingdom, 11 by France and 6 by China. By the year 2000 it is expected that approximately one-half of these nuclear vessels will be removed from service and in various states of decommissioning. A newspaper account in June 1997 indicated that 156 Russian nuclear submarines had been removed from service. In August 1996 it was ...
This paper outlines the opportunities for UK-Canada collaboration/feasibility studies in areas that include novel research into waste management and decommissioning. A number of Universities in the UK have programs relevant to such collaborations in areas such as fuels; thermal hydraulics, reactor system and materials.
The days of high-temperature reactors in the Federal Republic of Germany are numbered. The AVR has been decommissioned, and an application has been filed for licensing the decommissioning of the THTR. Nevertheless, Prof. Dr. Rudolf Schulten who is the director of Juelich Nuclear Research Center's Institute for Reactor Development, and also full professor of Aachen Technical University in the field of reactor safety, predicts a good future for the HTR reactor line on a worldwide level, due to the inherent safety of this reactor type. (orig.).
The legal basis to be provided is a licence for decommissioning work, issued for a particular reactor, including activities for recycling of disassembled, radioactive components and materials, subject to radioactivity measurements and exemption from radiological control of materials not exceeding the legally defined maximum level of contamination. (HP) [Deutsch] Es genuegt eine Stillegungsgenehmigung zu einem konkreten Abbauauftrag mit Verwertung radioaktiver Reststoffe nach Freigabe durch Radioaktivitaetsgrenzwertsfestsetzung. (HP)
Remote-controlled handling systems are required for work to be done in the decommissioning and dismantling of nuclear facilities. These systems are equipped with electronic devices suitable for use in working environments affected by ionizing radiation. The publication explains the step-wise progress achieved for improving the radiation resistance of electronic devices with the example of a four-quadrant controlling device for the motors of a manipulator. The radiation resistance of the device could be enhanced to radiation energies of 5.500 Gy. This means that a manipulator vehicle equipped with this controlling device can take up to approx. 15 kGy all in all, taking into account its own shielding properties. (DG).
From 1980 to 1993, the domestic production of uranium declined from almost 44 million pounds U{sub 3}O{sub 8} to about 3 million pounds. This retrenchment of the U.S. uranium industry resulted in the permanent closing of many uranium-producing facilities. Current low uranium prices, excess world supply, and low expectations for future uranium demand indicate that it is unlikely existing plants will be reopened. Because of this situation, these facilities eventually will have to be decommissioned. The Uranium Mill Tailings and Radiation Control Act of 1978 (UMTRCA) vests the U.S. Environmental Protection Agency (EPA) with overall responsibility for establishing environmental standards for decommissioning of uranium production facilities. UMTRCA also gave the U.S. Nuclear Regulatory Commission (NRC) the responsibility for licensing and regulating uranium production and related activities, including decommissioning. Because ...
The Office of Environmental Management's (EM) Roadmap, U.S. Department of Energy--Office of Environmental Management Engineering & Technology Roadmap (Roadmap), defines the Department's intent to reduce the technical risk and uncertainty in its cleanup programs. The unique nature of many of the remaining facilities will require a strong and responsive engineering and technology program to improve worker and public safety, and reduce costs and environmental impacts while completing the cleanup program. The technical risks and uncertainties associated with cleanup program were identified through: (1) project risk assessments, (2) programmatic external technical reviews and technology readiness assessments, and (3) direct site input. In order to address these needs, the technical risks and uncertainties were compiled and divided into the program areas of: Waste Processing, Groundwater and Soil Remediation, and Deactivation and ...
The Nuclear Regulatory Commission (NRC) is conducting an enhanced participatory rulemaking to establish radiological criteria for site cleanup and decommissioning of NRC-licensed facilities. Open public meetings were held during 1993 in Chicago, IL, San Francisco, CA, Boston, MA, Dallas, TX, Philadelphia, PA, Atlanta, GA, and Washington, DC. Interested parties were invited to provide input on the rulemaking issues before the NRC staff develops a draft proposed rule. This report summarizes 3,635 comments categorized from transcripts of the seven workshops and 1,677 comments from 100 NRC docketed letters from individuals and organizations. No analysis or response to the comments is included. The comments reflect a broad spectrum of viewpoints on the issues related to radiological criteria for site cleanup and decommissioning. The NRC also held public meetings on the scope of the Generic Environmental Impact Statement (GEIS) during July 1993. The ...
Cementitious materials have physical and chemical properties that are well suited for the requirements of radioactive waste management. Namely, the materials have low permeability and durability that is consistent with the time frame required for short-lived radionuclides to decay. Furthermore, cementitious materials can provide a long-term chemical environment that substantially reduces the mobility of some long-lived radionuclides of concern for decommissioning (e.g., C-14, Ni-63, Ni-59). Because of these properties, cementitious materials are common in low-level radioactive waste disposal facilities throughout the world and are an attractive option for entombment of nuclear facilities. This paper describes design considerations for cementitious barriers in the context of performance over time frames of a few hundreds of years (directed toward short-lived radionuclides) and time frames of thousands of years (directed towards longer-lived radionuclides). The ...
Cementitious materials have physical and chemical properties that are well suited for the requirements of radioactive waste management. Namely, the materials have low permeability and durability that is consistent with the time frame required for short-lived radionuclides to decay. Furthermore, cementitious materials can provide a long-term chemical environment that substantially reduces the mobility of some long-lived radionuclides of concern for decommissioning (e.g., C-14, Ni-63, Ni-59). Because of these properties, cementitious materials are common in low-level radioactive waste disposal facilities throughout the world and are an attractive option for entombment of nuclear facilities. This paper describes design considerations for cementitious barriers in the context of performance over time frames of a few hundreds of years (directed toward short-lived radionuclides) and time frames of thousands of years (directed towards longer-lived radionuclides). The ...
The slow or stagnant rate of nuclear power generation development in many developed countries over the last two decades has resulted in a significant shortage in the population of mid-career nuclear industry professionals. This shortage is even more pronounced in some specific areas of expertise such as radiological protection, waste management and decommissioning. This situation has occurred at a time when the renaissance of nuclear power and the globalization of the nuclear industry are steadily gaining momentum and when the industry's involvement in international and national debates in these three fields of expertise (and the industry's impact on these debates) is of vital importance. This paper presents the World Nuclear Association (WNA) approach to building and enhancing worldwide industry cooperation in radiological protection, waste management and decommissioning, which is manifested through the activities of the two WNA working groups ...
This request is submitted to seek interim approval to operate a chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) wastes. This request covers only the disposal of small quantities of solid PCB wastes contained in decommissioned su...
This Standards/Requirements Identification Document (S/RID) sets forth the Environmental Safety and Health (ESH) standards/requirements for the Plutonium Finishing Plant (PFP). This S/RID is applicable to the appropriate life cycle phases of design, construction, operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.
In the future even more than in the past, nuclear power will be indispensable in the present industrialized countries and in those still under development. The safe, nonpolluting, and economic supply of energy to mankind in the future includes so many different problems that the technology of the high-temperature reactor at its present level of development, and with the possibilities is offers above and beyond those provided by other, established, technologies, does not have to mark the end of some old line of development, but rather should be seen as the starting point of a development offering promise for the future. It is for this very reason that the extensive, valuable knowledge and experience accumulated in the construction, operation, and decommissioning of the AVR and THTR plants, the development of the HTR module and other variants and, last, but not least, the valuable results of projects such as PNP, NFE, and HHT, must be preserved ...
This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)
For satisfaction of international growing demand for electrical energy it is impossible to ignore contribution of nuclear power. With an expected lifespan for nuclear plants estimated to 50-60 years of operation (years for decommissioning added), there is a need for a steady multi-generational stream of competent staff to ensure safe operations of nuclear plants. It is incumbent to governments to invest in education, research, and training for the three to five generations of people who will construct, operate and eventually decommission nuclear plants over the duration of their life cycle. To develop sustained nuclear programs it is necessary to carry out a lot of major problems, but three of them look like as most important: 1. Training a qualified and competent personal to ensure all nuclear activities; 2. Multilateral approach for nuclear fuel cycle, with a guaranteed framework for ensuring the supply of NPP owners with the necessary ...
Decommissioning of radiological and nuclear installations is for this century the new challenge. One of the performance criteria is the reduction of total quantities of radioactive materials (liquid or solid) arising from dismantling and decontamination of radiological and nuclear installations. In this work we present a new application of the water soluble polymers used as: - flocculation agents in treatment and conditioning process within the management of radioactive liquid materials; - strippable coatings on solid materials based on the water soluble polymers. The parameters of water soluble polymers made in our Institute by radiation processing have been analysed, namely the molecular average weight, composition, and efficiency of utilization of these polymeric materials as well as the content of ash, additives, decontamination factor, consumption per surfaces/liter, corrosion aspects, compatibility with various surfaces (of metal, concrete, plastics, etc). ...
The contribution is concerned from a legal point of view with the systematic recording, classification and assessment of specific problems concerning the post-operational phase of a nuclear power plant. As an introduction, present experience with decommissioning in the Federal Republic of Germany is dealt with. The first part treats the factual side of section 7 III AtG, explains the terms mentioned, the concrete extent of licensing and priority relations. In part 2 the preconditions for licensing pursuant to section 7 III AtG are dealt with, the stipulations of which are made difficult in particular on account of the reference in section 7 III sentence 2 AtG. The third part is concerned with the legal consequence of section III AtG, i.e. the extent of official discretionary powers, whereby aspects of radioactive waste management carry great weight. In part four administrative and procedural particularities in the legal sense relating to licensing according to ...
The Korea Atomic Energy Research Institute has launched a decommissioning program of uranium conversion plant. One of the important tasks in the decommissioning program is the treatment of the sludge, which was generated during operation and stored in the two ponds of the lagoon. The treatment requires the volume reduction of lagoon sludges for the low cost of the program and the conversion of the chemical forms, including uranium, for the acceptance at the final disposal site. The physical properties, such as densities, were measured and chemical compositions and radiological properties were analyzed. The denitration was a candidate process which would satisfy the requirements for sludge treatment, and the characteristics of thermal decomposition and dissolution with water were analyzed. The main compounds of the sludge were ammonium and sodium nitrate from conversion plant and calcium nitrate, calcium carbonate from Ca precipitation and ...
The Federal Republic of German (FRG) had uniquely strict emission legislation for particulates SO_2 and NO_X from fossil-fired power plants. The 13th Regulation to the Federal Emission Control Act required that by 1 July 1988 all large furnaces fired with solid or liquid fuels that would not be decommissioned by 1993 be retrofitted with SO_2 control technology. The emission limits are 15 per cent of the sulphur introduced with the fuel (400 mg/m"3 maximum) at thermal capacities above 300 MW. 1 ref., 9 figs, 15 bibliographies.
Since the beginning of the sixties, France has developed a fleet of nuclear powered vessels. Insofar as the ships of the 2. generation are being built, the older ones are decommissioned and enter the dismantling process. The average rate is presently one submarine decommissioned every two or three years. The overall strategy for the decommissioning of French nuclear submarines can be brought down to 3 phases: 1. Level 1 dismantling which essentially consists in: - unloading the spent fuel and storing it in a pool ; - possibly emptying the circuits which contain radioactive liquids. The level 1 is easily achieved, as it is not very different from the plant situation during ship overhaul or major refits. 2. Level 2 dismantling which consists in isolating the nuclear reactor compartment from the rest of the submarine and conditioning it for interim storage on a ground facility located inside Cherbourg Naval Dockyard. The rest ...
The Nuclear Regulatory Commission (NRC) on December 29, 1993, promulgated self-guarantee requirements that materials licensees may use to demonstrate financial assurance for decommissioning costs. However, nonprofit colleges and universities, nonprofit hospitals, and for-profit firms that do not issue bonds are currently precluded, by their unique accounting and financial reporting systems, or by other features of their business practices, from using the financial tests for self-guarantors adopted by the NRC. This Report evaluates several alternative financial tests that might serve as the basis for self-guarantee by these three categories of licensees.
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
The TVR heavy water research reactor was deployed at Moscow Institute of Theoretical and Experimental Physics. In 1990, the final batch of the spent nuclear fuel from this reactor was shipped to Production Association (PA) 'Mayak' for reprocessing. The SNF removal was a stage of the reactor decommissioning activities. The designs of the TVR reactor and its fuel elements are similar to the RA reactor designs. Two ways of the RA reactor SNF transportation to PA 'Mayak' have been considered: in aluminum barrels and in additional canisters using respectively TUK-32 and TUK-19 shipping casks. The practical experience and the equipment used to prepare for the TVR reactor SNF removal can be helpful to the RA reactor personnel in finding the best way to perform these engineering operations. (author)
The calculated radioactive waste inventories of the Turkey Point pressurized water fission reactor (PWR) and the Starfire conceptual fusion tokamak are compared as a function of time from initial start-up to 10,000 years after decommissioning. Only material out of reactor at least one year is considered. The total activity in Ci/W(th) of the Starfire tokamak is slightly greater than that of the PWR during the active lifetimes of the two reactors and beyond 1000 years. However, using reduced activation materials in Starfire can result in about 1/2000 as much long-lived radioactivity as in the fission reactor. It is stressed that comparison of wastes on this basis is not straightforward, since the radioisotopes and methods required for their disposal are different for fusion and fission reactors. 2 refs., 1 fig., 2 tabs.
The US Department of Energy (DOE) has millions of gallons of high level nuclear waste stored in underground tanks at Hanford, Washington and Savannah River, South Carolina. These tanks will eventually be emptied and decommissioned. This will leave a residue of sludge adhering to the interior tank surfaces that may contaminate groundwaters with radionuclides and RCRA metals. Experimentation on such sludges is both dangerous and prohibitively expensive so there is a great advantage to developing artificial sludges. The US DOE Environmental Management Science Program (EMSP) has funded a program to investigate the feasibility of developing such materials. The following text reports on the success of this program, and suggests that much of the radioisotope inventory left in a tank will not move out into the surrounding environment. Ultimately, such studies may play a significant role in developing safe and cost effective tank closure strategies.
This is the twenty-ninth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, and presents the most recent reactor data available to the IAEA. It contains the following summarized information: - General information as of the end of 2008 on power reactors operating or under construction, and shut down; - Performance data on reactors operating in the Agency's Member States, as reported to the IAEA. The IAEA's Power Reactor Information System (PRIS) is a comprehensive data source on nuclear power reactors in the world. It includes specification and performance history data of operating reactors as well as reactors under construction or reactors being decommissioned. PRIS data are collected by the IAEA through the designated national correspondents of Member States
This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references.
The CO laser is superior in the absorption characteristic to materials to the CO2 laser due to its shorter wavelength. In consideration of this characteristic Nuclear Power Engineering Corporation is studying this applicability sponsored by the Ministry of International Trade Industry of Japan to cutting of reactor core internals of commercial nuclear power plant. In decommissioning of reactor core internals it is necessary to cut stainless steel plates of 305 mm thick. The authors cut stainless steel plates of up to 310mm thick in air and those of up to 150 mm thick underwater with a 20kW class laser. Further, models simulating key structural elements of PWR core internals were cut and secondary products to clarify the applicability of the CO laser cutting to reactor core internals were evaluated. (author)
The Decree specifies basic quality assurance requirements applicable to machines, their parts and materials, civil engineering structures, means for automated control of technological processes including hardware and software, and electricity supply systems related to nuclear safety of nuclear facilities, and stipulates binding procedures for the implementation of technical and organizational provisions associated with the quality of selected equipment to ensure nuclear safety of nuclear facilities. Safety classes are defined for selected equipment. Requirements laid on safety assurance documentation are specified, and requirements placed on safety assurance programmes, their preparation, finalization and approval are defined. Quality assurance requirements are also specified with respect to the designing, manufacture, construction, operation, repair, modification and decommissioning of nuclear facilities. The Decree entered into force on 1 December 1990. (J.B.).
Decontamination and decommission activities related to the Molten Salt Reactor Experiment (MSRE) involve the trapping and recovery of radiolitically generated uranium hexafluoride and fluorine. Although fission product radiolysis was known to generate F{sub 2}, the formation of UF{sub 6} and its transport from the fuel salt was unexpected. Some of these gaseous radiolysis products have been moving through the gas piping to a charcoal bed since the reactor was shut down in 1969. Current and planned remediation and clean-up activities involve the trapping of the gaseous products, deactivation and treatment of the activated charcoal bed, stabilization and reconditioning of the fuel salt, and recovery of the uranium. The chemical aspects of these processes, including radiolytic generation mechanisms, reactions between uranium hexafluoride and fluorine and trapping materials such as activated charcoal, activated alumina, and sodium fluoride, along with the analytical ...
In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.
This item covers a meeting held between members of the United Kingdom government's energy committee and representatives of British Nuclear Fuels (BNFL) to discuss their Annual Report and Accounts for the year 1988-89. The committee explored the reasons for escalating predictions of the costs of nuclear power and why decommissioning costs are so difficult to estimate accurately so as to include them in cost per kilowatt hour of generated electricity. The relationship between BNFL and the Ministry of Defence (MoD) was explored, as was the MoD's relationship with the United States Department of Defense. BNFL's financial position should improve when the thermal oxide reprocessing plant at Sellafield becomes operational, and the Chapelcross and Calder Hall reactors may contribute income from electricity generation. (UK).
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.
The Lowell Hydroelectric Project (Eldred L. Field) is a key feature of the Departments of Energy's National Low Head Hydroelectric Power Demonstration Program. This report summarizes the Project's Construction which began in October 1983 and was completed in November 1985. It also details project construction costs.
This document presents our proposal to continue the activities of Boston University researchers in eight projects in high energy physics research: Colliding Beams Physics; Accelerator Design Physics; MACRO Project; Proton Decay Project; Theoretical Particle Physics; Muon G-2 Project; and Hadron Collider Physics. The scope of each of these projects is presented in detail in this paper.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
The Atlantic Wind Test Site was established in 1980 as a laboratory to facilitate the evaluation and demonstration of wind energy systems and equipment. This annual report describes its organization and management, facilities, major projects, and the outlook for the future. Major projects include wind diesel; AWTS-IREQ collaboration; remote community data acquisition; lagerwey test program; Alaska Energy Authority Project; public education; Atlantic Orient Corporation 15/50 Project; and the soft VAWT project.
This presentation summarizes the present upgrade R&D projects in the TileCal collaboration. One project studies the possibility to divide the drawers into smaller minidrawers to simplify maintenance. There are three different front-end projects. There are also projects dealing with high voltage and low voltage distribution, projects for developing PMT dividers, low voltage electronics, data transmission and off-detector electronics.
Radioactive wastes are generally classified into 3 type depending on their physical property: liquid, solid and gaseous type. State-of -the art concerning liquid waste treatment has already been published; KAERI/TR-1315/99. Solid wastes classification package and treatment method will be studied to effectively manage them during the practical decommissioning work. All of the spent fuel produced during the operation of the TRIGA Mark-2 and 3 have been transported to the US last year, 1998, according to the spent fuel management strategy set-up by the US government for the non-proliferation of nuclear energy. Solid wastes are mainly all equipment existing inside of the reactors, activated concrete among the bio-shielded concrete, pipes, pimps, resin filter and it's housings, heat-exchangers, liquid waste storage tanks, to radioactive waste storage treatment facilities and so on. Solid wastes are generally low-level. They are classified according to the ...
Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the ...
This is the quarterly progress review report for Wolsung NPP 2, 3, 4 NSSS design and engineering which evaluates the performance of project and describes the project highlight, manpower loading status, design and engineering and project related meeting by...
The status of the South American Geocentric reference System (SIRGAS) Project is presented, including the project goals, objectives and tasks already carried out by the Working Groups. (author). 2 refs., 1 fig., 1 tab
...and biological processes acting on recruitment and post-recruitment EU-Agrinet - Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quality indicator ... Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quali EU-Agrinet - Project sheet: Genetic evaluation of European ...
The NASA/DoD Aerospace Knowledge Diffusion Research Project is a cooperative effort sponsored by NASA, Office of Aeronautics, Exploration and Technology (OAET), and DoD, SAF/AQT Deputy for Scientific and Technical Information. The research project is a jo...
The Sunshine Project of Japan was inaugurated in 1974. Since 1980 it has been promoting priority projects such as coal liquefaction. Japan is now promoting the basic and applied research that underpins this development and is increasing the efficiency of technical development. With regard to risk dispersion, the expansion of international cooperation such as the IEA is being promoted.
Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint project prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. It was originally written in English and translated into Japanese with some corrections. (author)
This Fact Sheet presents the mission of the West Valley Demonstration Project and information on the 1994 pollution prevention and recycling accomplishments.
Project methodology, analysis of the occupational and training situation, task analysis process, design process for a systematic training plan specific to the job position are described.
... Materials Research - Major Instrumentation Project (IMR-MIP) program in the Division of Materials ... for materials preparation and characterization essential for researchers studying materials in a ...
A design is proposed for forming the rear screen of a chamber firebox at the point of aerodynamic projection and a design for attaching the pipes of the aerodynamic projection using girders linked with the screen by hinges and movable connections.
Project finance is asset-based financing, meaning that the project lenders have recourse only to the underlying assets of a project. It involves both debt and equity, where the debt-to-equity ratio is typically large (e.g., 70% debt to 30% equity). Debt is used when available and when it is the least expensive form of financing, with equity still needed for credit worthiness. Most important, revenue from the project must be able to generate a return to the equity investors, and pay for interest and principal on the debt, transaction costs associated with developing and structuring the project, and operations and maintenance costs. Successful project financing must provide a structure to manage and share risks in an optimal way that benefits all participants, allocating risks to those entities that are able to mitigate each specific risk, and to share information ...
In the report the results of the estimations of radiological risk of various stages of decommissioning of nuclear submarines are presented. At occurrence on nuclear submarine the heavy failure, relating to the class hypotetical volume of acting of radionuclides in atmosphere can reach 1.6E(15) Bq. Results of estimations probable doses on an axis of a trace of a radioactive loop show, that at distribution of radionuclides during atmospheric carry to 'agreed' settlement (500-1000 m) the maximum doses on its territory can make: about 6.0E(-3) Sv (for the whole body); 3.0E(-3) Gy for the leather (basal layer); 6.3E(-2) Gy for the lungs (acute exposure) and up to 1.8 Gy for the thyroid gland. Hypotetical failure for the estimation of the greatest possible radioecological consequences for hydrobiocenosis is considering, connected with single discharge of liquid radioactive waste (LRW) in water area. At navigating failure of the tanker with LRW in water area can arrive ...
This comprehensive guide offers several tried and true steps to help you successfully manage the complex process of developing free software. Topics include project management, developer motivation, technical infrastructure to support collaboration, and project promotion. Producing Open Source Software is ideal for developers starting their own free software projects, or people who simply want to participate in the process.
I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.
While substantial research has examined the control of information systems (IS) projects, most studies in this area have only examined how one controller manages a single group of controllees. However, many IS projects, especially enterprise systems projects (often initiated by an organization's corporate headquarters, and involving business unit users and consultants), have multiple stakeholders. The corporate headquarters (the project's principal controller) must simultaneously ensure that the various stakeholders are aligned with the project's goals despite their diverse motivations, and that the stakeholders collaborate with each other to achieve project success. Behavior control theory argues that the controller enacts a control portfolio of formal and informal controls. However, the ...
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry`s impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the third ...
The FEL electron linac consists of three buncher cavities: two accelerator cavities and a deflection cavity, each with its own phase-coherent rf source. All sources will be pulsed for 100 ..mu..s at a 1-pps rate. The phase and amplitude stability requirements are +-1/2/sup 0/, and +-1/2%. There are two subharmonic bunchers, each requiring 5 kW at 108.33 MHz. All remaining cavities operate at 1300 MHz. The fundamental buncher requires 5 kW, whereas each of the accelerating cavities requires at least 3 MW. The deflection cavity requires up to 100 kW, which is coupled from one of the accelerator cavity rf sources. Prominent features of the rf system are the phase and amplitude control circuits and the multimegawatt klystron amplifiers. Three L3707 klystrons were obtained from the AMRAD radar site at White Sands, which was decommissioned in the early 1970s. The tubes originally were designed to produce 10-MW, 10-..mu..s pulses. Each tube has delivered over 3.6-MW, ...
The FEL electron linac consists of three buncher cavities: two accelerator cavities and a deflection cavity, each with its own phase-coherent rf source. All sources will be pulsed for 100 #mu#s at a 1-pps rate. The phase and amplitude stability requirements are +-1/2_0, and +-1/2%. There are two subharmonic bunchers, each requiring 5 kW at 108.33 MHz. All remaining cavities operate at 1300 MHz. The fundamental buncher requires 5 kW, whereas each of the accelerating cavities requires at least 3 MW. The deflection cavity requires up to 100 kW, which is coupled from one of the accelerator cavity rf sources. Prominent features of the rf system are the phase and amplitude control circuits and the multimegawatt klystron amplifiers. Three L3707 klystrons were obtained from the AMRAD radar site at White Sands, which was decommissioned in the early 1970s. The tubes originally were designed to produce 10-MW, 10-#mu#s pulses. Each tube has delivered over 3.6-MW, 100-#mu#s ...
The FEL electron linac consists of three buncher cavities: two accelerator cavities and a deflection cavity, each with its own phase-coherent rf source. All sources will be pulsed for 100 #mu#s at a 1-pps rate. The phase and amplitude stability requirements are + or - 1/2"0, and + or - 1/2%. There are two subharmonic bunchers, each requiring 5 kW at 108.33 MHz. All remaining cavities operate at 1300 MHz. The fundamental buncher requires 5 kW, whereas each of the accelerating cavities requires at least 3 MW. The deflection cavity requires up to 100 kW, which is coupled from one of the accelerator cavity rf sources. Prominent features of the rf system are the phase and amplitude control circuits and the multimegawatt klystron amplifiers. Three L3707 klystrons were obtained from the AMRAD radar site at White Sands, which was decommissioned in the early 1970s. The tubes originally were designed to produce 10-MW, 10-#mu#s pulses. Each tube has delivered over 3.6-MW, ...
Considerations for longevity of nuclear facilities and ease of decommissioning are of great importance for future nuclear power plants. To this end, a concept of an optimal structural concept for nuclear reactor buildings has been studied: the main feature of this concept is to utilize large-sized, light weight prefabricated members with ultrahigh strength materials. The following two items have been selected to study the prospective structure: (1) Applicability of ultrahigh strength materials for reinforced concrete shear walls (2) Construction using large sized prefabricated members As the first step (1), material and structural tests using ultrahigh strength materials, and the subsequent analysis of those tests for reinforced concrete shear walls, has been conducted. The positive results of this study show a bright future for the use of ultrahigh strength materials for the reinforced concrete shear walls of nuclear reactor buildings. As the second step (2), ...
Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required ...
The US Department of Energy (DOE) has millions of gallons of high level nuclear waste stored in underground tanks at Hanford, Washington and Savannah River, South Carolina. These tanks will eventually be emptied and decommissioned. This will leave a residue of sludge adhering to the interior tank surfaces that may contaminate nearby groundwaters with radionuclides and RCRA metals. Performance assessment (PA) calculations must be carried out prior to closing the tanks. This requires developing radionuclide release models from the sludges so that the PA calculations can be based on credible source terms. These efforts continued to be hindered by uncertainties regarding the actual nature of the tank contents and the distribution of radionuclides among the various phases. In particular, it is of vital importance to know what radionuclides are associated with solid sludge components. Experimentation on actual tank sludges can be difficult, dangerous and prohibitively ...
This document gathers a series of very short articles concerning nuclear industry around the world. Areva company is investing 30 million euros in its Chalon-Saint-Marcel plant, it is the consequence of the extension of service life of nuclear power plants in the Usa. Areva holds 40% of the American market concerning the replacement of steam generators and 50% of that concerning the replacement of closure heads. The Obrigheim nuclear power plant was definitely closed down on may 2004, this decommissioning is a step forward in the German policy of progressively stepping out of nuclear energy. Chinese authorities are willing to construct 40 nuclear reactors in 15 years, despite that, the contribution of nuclear energy to the generation of electricity will reach only 4% in 2020. In 2007 Cea will begin the construction works of a new research reactor (Jules Horowitz reactor) in the Cadarache site. Prices of the yellow cake have been going up during the last years: from ...
As shown in various new examples, HABOG facility (Netherlands), CERNAVODA (Candu - Romania), KOZLODUY (WWER - Bulgaria), CHERNOBYL ( RMBK - Ukraine), MAYAK (Spent Fuel from submarine and Icebreakers - Russia), recent studies allow to confirm the flexibility and performances of the CASCAD system proposed by SGN, both in safety and operability, for the dry storage of main kinds of spent fuel. The main features are: A multiple containment barrier system: as required by international regulation, 2 independent barriers are provided (tight canister and storage pit); Passive cooling, while the Fuel Assemblies are stored in an inert atmosphere and under conditions of temperature preventing from degradation of rod cladding; Sub-criticality controlled by adequate arrangements in any conditions; Safe facility meeting ICPR 60 Requirements as well as all applicable regulations (including severe weather conditions and earthquake); Safe handling operations; Retrievability of the spent fuel either ...
Safety and environmental assessments have been made of conceptual fusion power plant designs employing silicon carbide composites (SiC/SiC) as the first wall and blanket structure material. These have used similar analysis methods to earlier studies of designs based on vanadium alloy or low-activation martensitic steel, allowing direct comparisons. The very low short-term activation of silicon carbide results in an almost insignificant level of decay heat in postulated loss of coolant accidents, and a lower {gamma}-dose rate on the timescale of relevance to handling for maintenance operations. However on the longer time-scale, of interest in possible recycling operations, decommissioning and waste management, SiC/SiC appears to perform no better than vanadium alloy or low-activation martensitic steel, due in part to the activation of impurities in a realistic composition. Furthermore, its increased neutron transparency may result in higher activation in the vacuum ...
Rehabilitation of the abandoned uranium mining areas in Saxonia and Thuringia is a task posing also legal problems. The radiation protection laws of the former GDR continued to be effective to a great extent and proved to be a legal basis not ``perfect`` in formal terms, but suitably efficient in practice to tackle the manifold problems encountered in the land reclamation and waste disposal work. Originally intended to serve as a legal interim regime awaiting amendment at a later date, the body of laws available for the task proved to be a sufficient basis. (orig./HP) [Deutsch] Das fortgeltende Strahlenschutzrecht der frueheren DDR hat sich zwar nicht als formal `perfektes`, in der Sache aber strahlenschutzgerechtes und praktikables Instrument zur Loesung der anstehenden Sanierungsaufgaben erwiesen. Bei seiner Beurteilung darf nicht ausser Acht gelassen werden, dass die Ueberleitung dieses Rechts seinerzeit aus der Not eines kurzfristigen Regelungsbedearfs geboren wurden und stets nur ...
The liberalization of the electricity sector requires utilities to develop sound operation strategies for their power plants. In this paper, attention is focused on the problem of optimizing the management of the thermal power plants belonging to a strategic producer that competes with other strategic companies and a set of smaller non-strategic ones in the day-ahead market. The market model suggested here determines an equilibrium condition over the selected period of analysis, in which no producer can increase profits by changing its supply offers given all rivals' bids. Power plants technical and operating constraints are considered. An iterative procedure, based on the dynamic programming, is used to find the optimum production plans of each producer. Some combinations of power plants and number of producers are analyzed, to simulate for instance the decommissioning of old expensive power plants, the installation of new more efficient capacity, the severance of ...
In the United States today, governments at all levels and the citizenry are paying increasing attention to the effects, both real and hypothetical, of industrial activity on the environment. Responsible modem industries, reflecting this heightened public and regulatory awareness, are either substituting benign materials for hazardous ones, or using hazardous materials only under carefully controlled conditions. In addition, present-day environmental consciousness dictates that we deal responsibly with legacy wastes. The decontamination and decommissioning (D&D) of facilities at which mercury was used or processed presents a variety of challenges. Elemental mercury is a liquid at room temperature and readily evaporates in air. In large mercury-laden buildings, droplets may evaporate from one area only to recondense in other cooler areas. The rate of evaporation is a function of humidity and temperature; consequently, different parts of a building may be sources ...
The National Ignition Facility (NIF) will be a U.S. Department of Energy (DOE) national center for inertial confinement fusion (ICF) and other research into the physics of high temperatures and high densities, and a vital element of the DOE`s nuclear weapons Stockpile Stewardship and Management Program. It will be used by scientists from a numerous different institutions and disciplines to support research advancements in national security, energy, basic science, and economic development. Multiple powerful laser beams will `ignite` small fusion targets, helping liberate more energy than is required to initiate the fusion reactions. This paper discusses the Design for Environment process for NIF, some of the subsequent activities resulting from the initial study, and a few of the lessons learned from this process. Subsequent activities include the development of a Pollution Prevention and Waste Minimization Plan (P2/WMin) for the facility, which includes Pollution Prevention Opportunity ...
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these methods. Evaluation results show that the dry cask method is the most advantageous for ...
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these methods. Evaluation results show that the dry cask method is the most advantageous for ...
Strippable or temporary coatings are innovative technologies for decontamination that effectively reduce loose contamination at low cost. These coatings have become a viable option during the deactivation and decommissioning of both US Department of Energy (DOE) and commercial nuclear facilities to remove or fix loose contamination on both vertical and horizontal surfaces. The ALARA{trademark} 1146 strippable coating was demonstrated as part of the Savannah River Site LSDDP and successfully removed transferable (surface) contamination from multiple surfaces (metal and concrete) with an average decontamination factor for alpha contamination of 6.68 and an average percentage of alpha contamination removed of 85.0%. Beta contamination removed was an average DF of 5.55 and an average percentage removed of 82.0%. This paper is an Innovative Technology Summary Report designed to provide potential users with the information they need to quickly determine if a technology ...
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)
One of the challenges facing Clean Development Mechanism (CDM) projects today is their limited ability to secure financing for the underlying greenhouse gas emission reduction activities, particularly in the least developed countries. Among the key reasons for this is the fact that most financial intermediaries in the CDM host countries have limited or no knowledge of the CDM Modalities and Procedures. Moreover, approaches, tools and skills for CDM project appraisal are lacking or are asymmetrical to the skills in comparable institutions in developed countries. Consequently, developing country financial institutions are unable to properly evaluate the risks and rewards associated with investing or lending to developers undertaking CDM projects, and therefore have, by-and-large, refrained from financing these projects. In addition, some potential project proponents lack experience in ...
The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.
We combine data from the Latin American Migration Project and the Mexican Migration Project to estimate models predicting the likelihood of taking of first and later trips to the United States...Full Text Available
The energy strategy of the UK Overseas Development Administration is outlined with specific emphasis on energy efficiency and renewable energies. Based on 29 case studies concerning projects and programmes in both developed and developing countries, critical success factors for renewable energy projects are identified. UK)
It has been of interest whether and when the rearrangement of neuronal circuits can be induced after projection patterns are formed during development. Earlier studies using cats reported that the rearrangement...Full Text Available
... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... ...
Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)
million for advanced energy projects Thu, Sep 29, 2011 - Project Aims to Bring Bio-based Jet Fuel Production to the Northwest Mon, Sep 12, 2011 - Drive like the wind Thu, Aug 25,...
This quarterly update contains information on the National Bioenergy Center Biochemical Platform Integration Project, R&D progress and related activities.
... Highly-Functional Materials" was launched in JFY1996 under the New Materials field. This project was ... Bio-mimetic materials" (1) Advanced stimuli responsive materials (2) Harmonized molecular materials ...
Phase 2 of the four phase NASA/DoD Aerospace Knowledge Diffusion Research Project was undertaken to study the transfer of scientific and technical information (STI) from government to the aerospace industry and the role of librarians and technical informa...
...PROJECTS We are funded by industry, public bodies, charities and research councils and we are proud of the research projects undertaken by our world-class research groups . Research News To read more about our latest research to hit the media go to our News & Events page ...
As the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program initiates new cost-shared solar energy R&D under the Solar America Initiative (SAI), it is useful to analyze the experience gained from cost-shared R&D projects that have been funded through the program to date. This report summarizes lessons learned from two DOE-sponsored photovoltaic (PV) projects: the Photovoltaic Manufacturing Technology/PV Manufacturing R&D (PVMaT/PVMR&D) project and the Thin-Film PV Partnership project. During the past 10-15 years, these two projects have invested roughly $330 million of government resources in cost-shared R&D and leveraged another $190 million in private-sector PV R&D investments. Following a description of key findings and brief descriptions of the PVMaT/PVMR&D and Thin-Film PV Partnership ...
This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005
...October 2006 - present: University of Leeds, UK PhD Candidate in Geochemistry Thesis Title: Magnetite formation in reducing natural environments Supervisors: Dr Liane G. Benning ...Germany Bachelor of Science in Geosciences and Astrophysics Project Details Project Title: \\
funded these sensors as the first Discovery Mission of. Opportunity, part of the ... aboard a Russian Soyuz rocket. .... the Swedes on other projects, mainly sounding rocket projects. ..... incoming applications for the Fellowship Program, fielding ...
In summer 2000, the Cushing/Whitney Medical Library at Yale University began a demonstration project to digitize classic articles in neurosurgery from the late 1800s and early 1900s. The objective of...Full Text Available
The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a ren...
Objective: The paper describes and evaluates the use of Clinical Digital Libraries Project (CDLP) digital library collections in terms of their facilitation of timely clinical information...Full Text Available
The ''biotechnology 2000'' project is supervised by the project sponsor ''biology, energy, ecology'' at Forschungszentrum Juelich on behalf of the Federal Ministry for Research and Technology. The project activities cover the development of techniques and methods, cell biology, gene structure and gene regulation, photosynthetic production processes, biological hydrogen production, synthetic biology, protein design, neurobiological research, biosystems, plant breeding, phytomedicine and plant protection, the biology of waste disposal methods, research into methods which replace animal experiments, biological safety research, technology risk assessment, and ethical aspects. A general survey introduces the promoted projects, and standardized data sheets briefly introduce the individual activities. The appendix gives the ...
This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.
... due to the evolving nature of the Strategy Maps and the changing priority roles, it was decided not to link the SMSP directly with any Strategic Plans. ...
This forum showcases the work of a variety of different heritage-based centers, organizations, and projects dedicated to research, education, and preservation of tangible and intangible forms of cultural heritage. The descriptions of these centers demonstrate the diversity of heritage work being done today. The centers and projects described in the forum vary in their contexts, missions, and outcomes. Highlighted in the forum are preservation organizations, university-based heritage centers, and a global collaborative cultural heritage project. Each organization in the forum provides information about their missions and goals, their approaches or methods to heritage work, and a brief description of some of their initiatives.
... Title : Refining the Magnetic Forming Capability. ... Abstract : The purpose of this project was to refine the in-house magnetic forming capability. ...
One of the essential steps in the main scope Project Management is the Time Management made by the planning and control of the project schedule. In this work is presented the resource constrained scheduling problem beyond its mathematical formulation and a review of papers about this issue. In sequence is presented a practical example of this model considering a simplified model of an engineering project schedule of oil production equipment. The results obtained with the model application are shown and the conclusions about the work with resource constrained scheduling problems. (author)
The projects described in this report represent the Laboratory's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides, a) a director's statement, b) an overview of the laboratory's LDRD program, including PNNL's management process and a self-assessment of the program, c) a five-year project funding table, and d) project summaries for each LDRD project.
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
...Development of an Agroforestry Sequestration Project in Khammam District of India | International Energy Studies International Energy Studies News | Researchers | Publications ...Technologies Division Industrial Innovations Industrial Energy Analysis Copyright &1692006 Disclaimer Development of an Agroforestry Sequestration Project in Khammam District of India Authors:P. Sudha; V.... Vasistha 2006-10-10 0 Development of an Agroforestry Sequestration Project in Khammam District of India P. Sudha, V. Ramprasad, M.D.V. Nagendra,...
The first objective is to utilize reservoir characterization and advanced technologies to optimize the design of a carbon dioxide (CO{sub 2}) project for the South Cowden Unit (SCU) located in Ector County, Texas. The SCU is a mature, relatively small, shallow shelf carbonate unit nearing, waterflood depletion. The second objective is to demonstrate the performance and economic viability of the project in the field. This report includes work on the reservoir characterization and project design objective and the demonstration project objective.
This article describes the steps taken to mitigate the impact to existing wetlands by creating new wetlands in an airport expansion project. The project addressed maintaining suitable amounts of wetlands to accommodate peak waterfowl populations, moving of high voltage power transmission towers, and maintaining agricultural and hunting interests. This project involved recreating of open water areas, marsh habitat, mud flat habitat, saline meadow habitat, maintaining two existing wetlands in the area of the new wetlands without disturbing them, and improving upland habitat surrounding the new wetlands.
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the ...
A project to demonstrate residential heating and cooling with a well-water source heat pump is documented. The system is schematically illustrated and described, and project experience is discussed. The system is capable of using source water as cool as 40/sup 0/F. Project expenses are accounted for. (LEW)
This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.
The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.
DescriptionThis project is part of the BBSRCs special initiative on plant and microbial metabolomics. The project will primarily focus on the trichothecene mycotoxin producing Ascomycete fungus Fusarium graminearum (Fg) which causes ear blight disease of small grain cereals. The project aims to explore the metabolome of various wild-type and single gene deletion Fg strains and to compare some of these with the identical gene mutation in the budding yeast, S. cerevisiae (Sc) and the saprophytic filamentous [continued...
This project is designed to establish one basis for empirically linking aspects of management and organizational design to the safe operation of nuclear power plants. Current work is focusing on (a) reviewing existing literature relevant to this linkage, and (b) isolating and incorporating numerous safety relevant indicators. Later stages of this project will involve hypothesis development, data collection and analysis.
The Coordinated Research Project is a topical collection of research agreements and contracts. The research contracts are awarded with financial support of about 10-20% of the total contract cost. Among the activities of the project is the organization of consultant group meetings and workshops involving several international experts and representatives of users and developers of border radiation monitoring equipment. The project also supports in coordinating the development of equipment and techniques for up-to-date border monitoring and in establishing of a process for providing nuclear forensics support to member states
Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.
Daya Bay Nuclear Power Station is the largest joint-venture project which is also the largest commercial nuclear power plant currently under construction in China mainland. Organized and executed strictly in accordance with international standards, the Daya Bay project is seen as the first step taken by China in the development programme of large-capacity commercial nuclear power units.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
Biofuels may contribute to both rural economic development and climate change mitigation and adaptation. The Gota Verde Project in Yoro, Honduras, attempts to demonstrate the technical and economic feasibility of small-scale biofuel production for local use by implementing a distinctive approach to feedstock production that encourages small farm sizes, mixed cropping of biofuel feedstock from Jatropha and food crops, particularly corn and beans, grown side by side on the same farmland and the total involvement of small rural farmers. But is the project sustainable? Using EC-Assess, the Earth Charter ethics-based assessment tool, to assess the sustainability of this project, the author found that in some assessment categories the actions surpassed the intended objectives, showing that the project was achieving certain Earth Charter goals without specifically stating its intention to address them. ...
In the context of the LHC Computing Grid (LCG) project, the Applications Area develops and maintains that part of the physics applications software and associated infrastructure that is shared among the LHC experiments. The "Physicist Interface" (PI) project of the LCG Application Area encompasses the interfaces and tools by which physicists will directly use the software, providing implementations based on agreed standards like the AIDA interfaces for data analysis. In collaboration with users from the experiments, work has started with implementing the AIDA interfaces for (binned and unbinned) histogramming, fitting and minimization as well as manipulation of tuples. These implementations have been developed by re-using existing packages either directly or by using a (thin) layer of wrappers. In addition, bindings of these interfaces to the Python interpreted language have been done using the dictionary subsystem of the LCG-AA/SEAL ...
SummaryPrimary visual cortex recombines inputs from magnocellular (M) and parvocellular (P) streams to create functionally specialized outputs. Understanding these input-output relationships is complicated by the fact that layer 4B, which provides outputs to dorsal visual areas, contains multiple cell types. Using a modified rabies virus that expresses green fluorescent protein, we show that layer 4B neurons projecting to MT are a majority spiny stellate, whereas those projecting to V2 are overwhelmingly pyramidal. Regardless of cell type, MT-projecting neurons have larger cell bodies, more dendritic length, and are deeper within layer 4B. Furthermore, MT-projecting pyramidal neurons are located preferentially underneath cytochrome oxidase blobs, indicating that MT-projecting neurons of bo...
The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.
For pt.I see ibid., vol.516, p.426-48, 1998. Manifest N=2 supersymmetric hypermultiplet mass terms can be introduced in the projective N=2 superspace formalism. In the case of complex hypermultiplets, where the gauge covariantized spinor derivatives have an explicit representation in terms of gauge prepotentials, it is possible to interpret such masses as vacuum expectation values of an Abelian vector multiplet. The duality transformation that relates the N=2 off-shell projective description of the hypermultiplet to the on-shell description involving two N=1 chiral superfields allows us to obtain the massive propagators of the N=1 complex linear fields in the projective hypermultiplet. The N=1 massive propagators of the component superfields in the projective hypermultiplet suggest a possible ansatz for the N=2 massive propagator, which agrees with an explicit calculation in N=2 superspace. (orig.).
The European demonstration project Hip Hip (house integrated photovoltaic high-tech in public) led the French photovoltaic market to reach a level comparable to those of the other European countries in terms of relevance of implemented solutions and costs. This document presents the best realizations and the experience gained through the Hip Hip project. Its aim is to convince the designers and managers of building projects of the advantages of photovoltaic installations integrated to the structure and connected to the power distribution grid: 1 - presentation of the technology; 2 - status of the Hip Hip demonstration project (goals, results: main innovations and impact on the French market); 3 - different possibilities of integration to the building structure; 4 - examples of projects realized in France in the framework of the Hip Hip project: integration in ...
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry's impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the third ...
The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report ...
The Fifteenmile Basin Habitat Improvement Project is an ongoing multi-agency effort to improve habitat in the Fifteenmile drainage and increase production of the depressed wild, winter steelhead run. Cooperating agencies include the Oregon Department of Fish and Wildlife, USDA Forest Service. USDA Soil Conservation Service and Bonneville Power Administration. in consultation with the Confederated Tribes of Warm Springs. The Oregon Department of Fish and Wildlife is administering project work on state and private lands and the U.S.D.A. Forest Service is administering project work on National Forest land. Project work on the Forest has been sub-divided into four components; (1) Ramsey Creek, (2) Eightmile Creek, (3) Fifteenmile Creek, and (4) Fivemile Creek. Forest Service activities in the Fifteenmile basin during 1988 involved habitat improvement work on Ramsey Creek, continuation of physical and ...
The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the ...
The leading environmental problem facing coastal Louisiana regions is the loss of wetlands. Oil and gas exploration and production activities have contributed to wetland damage through erosion at numerous sites where canals have been cut through the marsh to access drilling sites. An independent oil and gas producer, working with Southeastern Louisiana University and two oil field service companies, developed a process to stabilize drill cuttings so that they could be used as a substrate to grow wetlands vegetation. The U.S. Department of Energy (DOE) funded a project under which the process would be validated through laboratory studies and field demonstrations. The laboratory studies demonstrated that treated drill cuttings support the growth of wetlands vegetation. However, neither the Army Corps of Engineers (COE) nor the U.S. Environmental Protection Agency (EPA) would grant regulatory approval for afield trial of the process. Argonne National Laboratory was ...
DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current ...
The strategy for management of the Oak Ridge National Laboratory`s (ORNL) radioactively contaminated liquid waste was reviewed in 1991. The latest information available through the end of 1990 on waste characterization, regulations, US Department of Energy (DOE) budget guidance, and research and development programs was evaluated to determine how the strategy should be revised. Few changes are needed to update the strategy to reflect new waste characterization, research, and regulatory information. However, recent budget guidance from DOE indicates that minimum funding will not be sufficient to accomplish original objectives to upgrade the liquid low-level waste (LLLW) system to comply with the Federal Facilities Agreement, provide long-term LLLW treatment capability, and minimize environmental, safety, and health risks. Options are presented that might allow the ORNL LLLW system to continue operations temporarily, but they would significantly reduce its capabilities to handle ...
A multielement apparatus for the removal of aerosols formed in the vitrification of simulated high-activity accident wastes from the decommissioned nuclear power plant A-1 has been designed, manufactured and tested. The apparatus consists of two cooling and condensing steps connected in series, and of five filtration steps also connected in series. The five filtration steps allowed to achieve a decontamination factor of 1x10"5 in the case of removal of a NaCl("2"4Na) testing model aerosol. The decontamination factor for removal of the cesium aerosol by the whole apparatus was 3.3x10"6. In the first filtration step the aerosols are removed by the cartridge with a filtration fabric made of polyethylene fibers, in the second step by the cartridge with a granulated natural material, in the third step by the cartridge with glass-fiber filtration paper, in the fourth and fifth steps by the cartridge with high-efficiency filtration paper made of glass microfibers. In the ...
The strategy for management of the Oak Ridge National Laboratory`s (ORNL`s) radioactively contaminated liquid waste was reviewed. The latest information on waste characterization, regulations, US Department of Energy (DOE) budget guidance, and research and development programs was evaluated to determine how the strategy should be revised. Few changes are needed to update the strategy to reflect new waste characterization, research, and regulatory information. However, recent budget guidance from DOE indicates that minimum funding will not be sufficient to accomplish original objectives to upgrade the liquid low-level waste (LLLW) system to be in compliance with the Federal Facilities Agreement compliance, provide long-term LLLW treatment capability, and minimize Environmental Safety & Health risks. Options are presented that might allow the ORNL LLLW system to continue operations temporarily but significantly reduce its capabilities to handle emergency situations, provide treatment ...
Since the 1970 innovations have allowed both active and passive neutron techniques to address various safeguards and waste measurement needs in the DOE complex. Much research was focused on satisfjring the 100-nCi/g detection limit for TRU waste in 208-liter drums. The emphasis on measuring drum-sized containers for disposal at WIPP has resulted in improved waste assay capability that now needs to be extended to larger containers. The desire to expedite the decontamination and decommissioning of certtain DOE facilities, and the large waste encountered in that process, has prompted the need for increasingly large disposal containers. Instruments have recently been built to accommodate crates that are nearly 100 cubic feet in volume, such as a B-25 box or Standard Waste 13ox. The density of hydrogen inside a waste container profoundly affects the accuracy of neutron measurements, and the metal content greatly affects sensitivity. Depending on the matrix, and ...
Promoting the exchange of information related to implementation of the As Low as Reasonably Achievable (ALARA) philosophy is a continuing objective for the Department of Energy (DOE). This report was prepared by the Brookhaven National Laboratory (BNL) ALARA Center for the DOE Office of Health. It contains the fifth in a series of bibliographies on dose reduction at DOE facilities. The BNL ALARA Center was originally established in 1983 under the sponsorship of the Nuclear Regulatory Commission to monitor dose-reduction research and ALARA activities at nuclear power plants. This effort was expanded in 1988 by the DOE`s Office of Environment, Safety and Health, to include DOE nuclear facilities. This bibliography contains abstracts relating to various aspects of ALARA program implementation and dose-reduction activities, with a specific focus on DOE facilities. Abstracts included in this bibliography were selected from proceedings of technical meetings, journals, research reports, ...
This bibliography contains abstracts relating to various aspects of ALARA program implementation and dose reduction activities, with a focus on DOE facilities. Abstracts included in this bibliography were selected from proceedings of technical meetings, journals, research reports, searches of the DOE Energy, Science and Technology Database (in general, the citation and abstract information is presented as obtained from this database), and reprints of published articles provided by the authors. Facility types and activities covered in the scope of this report include: radioactive waste, uranium enrichment, fuel fabrication, spent fuel storage and reprocessing, facility decommissioning, hot laboratories, tritium production, research, test and production reactors, weapons fabrication and testing, fusion, uranium and plutonium processing, radiography, and aocelerators. Information on improved shielding design, decontamination, containments, robotics, source prevention ...
The paper is based on a NEA study entitled `Past Trends and Current State of Nuclear Research Institutes`, which has been published in 1996. The evolution of nuclear research institutes (NRIs) in NEA countries is described from their establishment in the early fifties to present. The objectives, missions, purposes, and competences of NRIs are highlighted. Further, the resources (budget, qualified manpower, equipment such as research reactors and laboratories) are analysed, emphasising the role of the government. Country specific examples are given to illustrate different aspects of the historic evolution, present status and trends of NRIs. It is expected that the future role of NRIs will reflect the progress in nuclear science and technology and the evolving requirements of the nuclear industry with regard to safety enhancement, fuel cycle optimisation, plant life time management and extension, decommissioning of nuclear facilities and radioactive waste disposal. ...
The paper is based on a NEA study entitled 'Past Trends and Current State of Nuclear Research Institutes', which has been published in 1996. The evolution of nuclear research institutes (NRIs) in NEA countries is described from their establishment in the early fifties to present. The objectives, missions, purposes, and competences of NRIs are highlighted. Further, the resources (budget, qualified manpower, equipment such as research reactors and laboratories) are analysed, emphasising the role of the government. Country specific examples are given to illustrate different aspects of the historic evolution, present status and trends of NRIs. It is expected that the future role of NRIs will reflect the progress in nuclear science and technology and the evolving requirements of the nuclear industry with regard to safety enhancement, fuel cycle optimisation, plant life time management and extension, decommissioning of nuclear facilities and radioactive waste disposal. ...
The Helium and Lead Observatory (HALO) is a supernova neutrino detector under development for construction at SNOLAB. It is intended to fulfill a niche as a long term, low cost, high livetime, and low maintenance, dedicated supernova detector. It will be constructed from 80 tonnes of lead, from the decommissioning of the Deep River Cosmic Ray Station, and instrumented with approximately 384 meters of {sup 3}He neutron detectors from the final phase of the SNO experiment. Charged- and Neutral-Current neutrino interactions in lead expel neutrons from the lead nuclei making a burst of detected neutrons the signature for the detection of a supernova. Existing neutrino detectors are mostly of the water Cerenkov and liquid scintillator types, which are primarily sensitive to electron anti-neutrinos via charged-current interactions on the hydrogen nuclei in these materials. By contrast, the large neutron excess of a heavy nucleus like Pb acts to Pauli-block p)n ...
Before the 1997 Kyoto Protocol on Climate Protection, the fluorinated greenhouse gases HFCs, PFCs, and SF6 (F-gases) aroused little public attention. Since then, the standards on surveying and reporting on national emissions have been rising constantly. Amongst others, the annual reporting to the UNFCCC secretariat makes detailed declarations on use and emissions of F-gases necessary, which have to be filled in specified formats for submission (Common Reporting Format = CRF). The scientific basis has been set out by the UNFCCC guidelines on reporting, in accordance with the instructions laid down in IPCC good practice guidance. Additionally, in Germany the Centralised System of Emissions (ZSE) shall provide a suitable tool to satisfy any quality needs of both activity data and emission factors. From 1995 onwards, activity data and emissions of each individual application sector shall be presented in a comprehensible and transparent way. Therefore, the way of data collection as well as ...
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US ...
Full text: The site selection process for a near surface repository dedicated for the radioactive waste resulted from the Cernavoda NPP operation and decommissioning started early in 90's. Each site selection stage included the collection of data from specific field and laboratory works as well as the appropriate safety performance evaluation. In order to assess/confirm the performance of the natural barrier of the Saligny site, the radionuclide concentration in the disposal system compartments has been evaluated, as complementary safety indicator of repository. The siting process was made in accordance with national and international regulations and standards and using a conceptual design similar to those used at L'Aube (France), ElCabril (Spain) or Mohovce (Slovak Republic). ANDRAD, the Romanian waste management organization that has continued the siting process in the last three years applied and obtained a partial siting license from CNCAN in 2008. In 2009, ...
Large-scale decommissioning of Russian nuclear-powered submarines (NPS) and their utilization prospects gave rise to numerous complicated scientific and technical, as well as economic, problems. Problems of handling of radioactive equipment from the reactor compartments (RC) are among the vital ones, arousing a growing concern with the public. Without solution of the problems the processes of NPS utilization can not be considered completed. It involves potential hazard, for the environment both from NPS being paid up (temporal on-float storage) with unloaded spent nuclear fuel (SNF), and RC, cut from submarine hull, containing highly radioactive equipment and materials but no SNF. Diverse variations of the concept of reactor compartment handling of NPS subject to, utilization are possible, but, in principle, there are essentially two variants: (1) RC utilization directly in the course of NPS utilization, envisaging removal of radioactive equipment from the reactor ...
One of the aims of SILMU, the Finnish Research Programme for Climate Change, was to produce information for decision-makers concerning climate change and its mitigation. One integrative project for this purpose was PAATE, an inquiry into the present state and future possibilities of interaction between researchers and decision-makers. The aims of the PAATE project can be summarised as follows: (1) to conduct a survey of the state of climate change research and climate policy in Finland, (2) to develop the interaction between climate research, policy makers and different societal organisations, (3) to acquire methodological experiences on the realisation of projects of this type, (4) to provide material for the final report of the SILMU project and for further action, and (5) to promote the rational development of climate policy. Methodologically, the PAATE project used the Delphi ...
This report contains the proceedings of the NKS-B Summary Seminar held on 24-25 October 2005 in Tartu, Estonia. The aim of the seminar was to provide a forum for presenting and discussing the results obtained in the NKS-B programme during the project period 2002 - 2005. The main attention was focused on radioecology and measurement techniques including presentations on the work done in the Projects INDOFERN (New Indicator Organisms for Environmental Radioactivity), LABINCO (Intercomparison of Laboratory Analyses of Radionuclides in Environmental Samples) and ECODOSES (Improving Radiological Assessments of Doses to Humans from Terrestrial Ecosystems). The total number of presentations in the seminar was 27. The seminar was also the final seminar of the four-year INDOFERN Project. The objective of the project was to identify new indicator organisms and biomarkers for assessment of environmental ...
Work at Institutt for energiteknikk (IFE) comprises both nuclear and non-nuclear activities. The main nuclear program is centered on the Halden Reactor Project. In 1958, the first Halden Reactor Project Agreement was signed by organisations representing 12 European countries. During 1994 France became a full member and associate membership was established with Russia. Accordingly, 16 countries were participating in the Project by the end of the year. The objectives have evolved from being simply a demonstration of the operation of a boiling heavy-water reactor to becoming a substantial research and development programme covering the domains of human-machine interaction, fuel behaviour, materials testing, water chemistry, and instrumentation. In 1994, significant progress was achieved in all of the areas addressed by the project, including the re-instrumentation of irradiated fuel rods, fission gas ...
The primary objective of this project is to enhance domestic petroleum production by demonstration and technology transfer of an advanced oil recovery technology in the Paradox basin, southeastern Utah. If this project can demonstrate technical and economic feasibility, the technique can be applied to approximately 100 additional small fields in the Paradox basin alone, and result in increased recovery of 150 to 200 million barrels of oil. This project is designed to characterize five shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation and choose the best candidate for a pilot demonstration project for either a waterflood or carbon dioxide (CO{sub 2}-)flood project. The field demonstration, monitoring of field performance, and associated validation activities will take place in the Paradox basin within the Navajo Nation. The results of this ...
Taiwan has completed a very successful five-year industrial waste minimization (IWM) demonstration and promotion project sponsored by the government. From 1990 to 1995, the project successfully disseminated the IWM concept of pollution prevention (P2) to industries. It effectively reduced industrial waste while significantly benefitting the economy by assisting industries in implementing in-plant IWM programs. In July 1995, the second stage of the five-year IWM and ISO 14000 promotion project was initiated for further promoting the IWM, P2, and cleaner production and, in particular, coping with the upcoming international environmental management standards (ISO 14000). To assist industries in establishing an environmental management system (EMS) and accumulating related experience, an EMS pilot demonstration project of five model industries and an ISO 14001 EMS demonstration and promotion ...
The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational ...
GAO's review of the H-Coal and Exxon projects showed inadequacies in DOE's contracting practices and a failure by DOE to properly plan, manage, and monitor, especially the H-Coal project. The initial Government-industry H-Coal agreements regarding the level of investment by private sponsors and the ceilings imposed on sharing in cost growth were imbalanced. Larger investments by private sponsors and sharing of cost growth provides an incentive to private sponsors to control costs and helps to assure that each party is fully committed to the success of the project. DOE started the H-Coal project prematurely before sufficiently detailed designs were available and without adequate project planning for functions such as construction scheduling, materials handling, inventory systems, and quality control. DOE staffing was inadequate at both projects ...
'The primary objective of this research project is to acquire a deeper fundamental knowledge of acoustic cavitation and cavitation chemistry, and in doing so, to ascertain how ultrasonic irradiation can be more effectively applied to environmental problems. Four on-going projects will be described in this progress report, The first project is the destruction of carbofuran in a Near-Field Acoustical Processor (NAP), and the hydrodynamic characterization of the reactor. The second project is a comprehensive study of how ultrasonic frequency influences sonochemical reaction rates; the substrate it, the preliminary portion of this study has been hydrogen peroxide formation. The third project in progress is destruction of four polychlorinated biphenyls at 20 kHz. Work so far has been at 20 kHz, but the most significant portion of this project will involve a ...
SummaryInitial results from the use of activated dolomite from QUESTOR project L1 have proved extremely encouraging in terms of metallic ion (also phosphate, nitrate and dye) removal from wastewater, with capacities in some instances in excess of commercially available activated carbons.This new project involves investigating actual plant effluent in laboratory scale columns and the design of a pilot scale rig for on site trials. The project also involves investigating disposal options and an economic [continued...
The purpose of the project was to evaluate the potential influence of global warming on the Finnish economy and well-being during the next 50 to 100 years. In order to achieve this goal a cost-benefit analysis was conducted which produced a quantitative estimate of the economic and partially non-economic effects of the climate change projected to happen in Finland. The analysis utilised the natural scientific evidence produced by other SILMU projects in partial sector models. Also a broader view of the phenomena and the possibilities for restricting greenhouse gas emissions was briefly discussed and surveyed. Two of the more important side-goals were to develop the methodology for country analysis and study the possibilities for adaptation
Using the past diffusion trends of four renewable energy technologies for irrigation water pumping in India (SPV pumps, windmill pumps and biogas/producer gas driven dual fuel engine pumps), results of an attempt to project their future dissemination levels, have been presented in this study. The likely contribution of the renewable energy options considered in the study to the projected energy demand for irrigation water pumping in India has been estimated. Estimates of the associated investment requirements taking into account the learning effect have also been presented. (author)
The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.
The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D&D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the {open_quotes}devil you know{close_quotes} than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies.
The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.
The Austrian sugar industry has developed a project for the manufacture of alcohol that is geared to the conditions in that country and is based on sugar beet as raw material. An alcohol production plant could be integrated in a sugar factory and operate all the year round at a capacity of 120,000 l/d. In this factory, the fermentation raw material would be in the form of green syrup (also thick juice if the need arose) and would be supplied from other sugar factories operating without molasses. The vinasse is to be concentrated and used or burnt. The project provides new possibilities for agriculture, and the sugar industry expects an improvement in plant utilization and a diversification.
Purpose: Assess the feasibility of using NASA satellite data to monitor persistent saltwater intrusion in coastal marshes. End User: USGS National Wetlands ...
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)
Challenges of robotic cars, sponsored by the Defense Advanced Research Projects Agency (DARPA) of the U.S. Defense Department. Carroll Cordes, recently retired USGS branch chief,...
Summary We describe the initiation and establishment of The University of Zambia - University College London Medical School (UNZA-UCLMS) Research and Training Project, an entirely African scientist-led, south-north partnership. In its 16 year existence, the project, by successfully obtaining competitive grant funding, has transformed itself into one of Africa's most productive African-led R&D programmes with training and visible research outputs. The project serves as a role model and now networks R&D and training activities with six southern African (10 institutions) and six European countries. This project case study illustrates that deep commitment is essential for success and that the factors which facilitate success in R&D in Africa need to be evaluated. The long-term prospects for su...
Energy projects are extremely capitalistic and the costs involved have a significant weight on the balance sheets of companies. This paper describes the general rules of financing policies used by companies from the natural gas and petroleum industries: constraints (external and financial markets, partnership, warranties..); implication of financiers; risk analysis (political (nationalization, civil or military troubles, difficult transfer of profits outside the project..), financial (property developer, nature of the project, delay, cost overruns, performance, market..)); financial instruments (proper funds and debt, bankers and insurers, loans etc..). These rules are illustrated with several examples of recent projects of gas pipelines and exploitation of oil fields abroad. (J.S.)
The book tries about the International and national aspects, natural gas situation, production, consumption, prices, demand projection, energetic plans, norms and laws of the natural gas in Colombia
Three companies--Amerada Hess Ltd., Shell Expro (a 50/50 joint partnership between Shell and Esso) and Texaco--have joined forces in a project that will combine their expertise. The Triton project will allow three fields (Bittern, Guillemot West and Gullemot Northwest) to be developed simultaneously using subsea technology, with the wellheads on the seafloor and 68 miles (110 km) of flowlines taking oil and gas produced from the fields to a central floating production storage and offloading (FPSO) vessel. These fields are located in the central area of the North Sea, about 118 miles from Aberdeen in 295 ft of water. The paper discusses the development of the fields, subsea technology, technical challenges, laying the pipeline, and project completion.
In the context of the LHC computing grid (LCG) project, the applications area develops and maintains that part of the physics applications software and associated infrastructure that is shared among the LHC experiments. The "physicist interface" (PI) project of the LCG application area encompasses the interfaces and tools by which physicists will directly use the software, providing implementations based on agreed standards like the analysis systems subsystem (AIDA) interfaces for data analysis. In collaboration with users from the experiments, work has started with implementing the AIDA interfaces for (binned and unbinned) histogramming, fitting and minimization as well as manipulation of tuples. These implementations have been developed by re-using existing packages either directly or by using a (thin) layer of wrappers. In addition, bindings of these interfaces to the Python interpreted language have been done using the dictionary subsystem ...
Oct 2, 2007 ... Other payloads included the Orbiter Experiments Autonomous Supporting Instrumentation System-1 (OASIS-1), a cooling system designed for ...
This document presents a summary of the work performed in support of the Buried Waste Robotics Program Subsurface Mapping Project. The project objective was to demonstrate the feasibility of remotely characterizing buried waste sites. To fulfill this objective, a remotely-operated vehicle, equipped with several sensors, was deployed at the Idaho National Engineering Laboratory. Descriptions of the equipment and areas involved in the project are included in this report. Additionally, this document provides data that was obtained during characterization operations at the Cold Test Pit and the Subsurface Disposal Area, both at the Idaho National Engineering Laboratory's Radioactive Waste Management Complex, and at the Idaho Chemical Processing Plant. The knowledge gained from the experience, that can be applied to the next generation remote-characterization system, is extensive and is presented in this report.
This report updates the status of 32 large projects having EPRI authorizations of $5 million or more. It also describes 86 smaller projects that have EPRI authorizations of less than $5 million and that have a high likelihood of producing a utility-useful new near-term accomplishment within the next two years. Finally, there are 45 examples of analytical, experimental and bench-scale projects that were influential in confirming or redirecting EPRI's research program. These examples cover the entire spectrum of electric R and D: (1) fuel processing, (2) electric power generation, (3) transmission and distribution, (4) energy storage and management, (5) energy analysis, and (6) environmental assessment and control.
ObjectivesTo improving the livelihoods of resource-poor farmers in developing countries through plant sciences research.Information on individual projects in the programme can be found by selecting this programme in the advanced search page. Please note that expenditure given in the project records contributes towards the overall expenditure of the programme.DescriptionProject Background: The PSP broad spectrum of research encompasses the latest biotechnology techniques for screening and breeding for drought/disease tolerance through to the development of key technologies - simple, low-cost interventions, the impacts of which are large enough to induce farmers to make other, perhaps more risky or more costly, changes in agronomic practices in order to make yet further gains. The Plant Sciences Research Programme funds projects under five research theme [continued...
The objective of this project was to develop new photocatalytic or other innovative process chemistry for the treatment of pink water and related contaminated water.
Strategies are needed for assessing the risks of exposures to airborne toxicants that vary over concentrations and durations. The goal of this project was to describe the relationship between the concentration...Full Text Available
of Earth Science data and information management capabilities. Dale Schulz/400 . For your exceptional achievement in leading the joint LaRC/GSFC team in ...
Apr 9, 2003 ... Adam Kissiah Jr., a retired KSC engineer, will be honored for his development of the digital hearing aid technology that led to the cochlear ...
Jun 20, 2011 ... NASA and the Defense Advanced Research Projects Agency (DARPA) are offering high school students the opportunity to design experiments ...
This report gives a brief introduction to the project `Probabilistic Design Tool for Wind Turbines` - PRODETO - which was carried out during the years 1996-98 with partial funding from the European Commission under the Non-Nuclear Energy Programme JOULE III. The report gives an overview of the objectives and motivation for the project, and the methodology used. In this context, an example of reliability-based wind turbine design against fatigue failure is outlined with emphasis on the various important steps herein, which include probabilistic load and resistance modelling, calculation of failure probability, and calibration of partial safety factors for use with a deterministic design code format. The results of the project are presented with emphasis on a developed computer program and its capabilities, and the various elements of an executed case study are outlined. A list of project reports ...
The Bantam System Technology Project is one element of the Advanced Space Transportation Program -- a NASA initiative to reduce the cost of space launch and ...
KEPCO (Korean Electric Power Corp.) with the support of AECL and other Korean and Canadian subcontractors has created a strong multi-company team to execute design and construction of the Wolsung-2 CANDU 6 power plant. Key concepts of the project team are: 1. KEPCO is the project manager, and AECL is the major engineering and supply contractor; 2. Significant participation by Korean companies in design work in Canada and Korea; 3. Significant manufacturing in both Canada and Korea; 4. Construction by Korean contractors. Key concepts of the Wolsung 2 design are: 1. Evolutionary improvement of the Wolsung-1 plant which balances proven technology and necessary design improvements including current codes and standards. 2. Sharing some structures with the Wolsung-1 plant. This paper describes the successful establishment and operation of the complex project interfaces along with the current project status ...
The funding for a coal-liquefaction demonstration plant near Morgantown, W.Va., appears more certain since Japan has committed $175 million toward the project. West Germany has already signed a memorandum of understanding to contribute 25% of the expected $700 million cost. West Virginia Governor J. Rockefeller has said that he feels sure the Carter Administration will approve the project since half the money is assured. The solvent-refined-coal (SRC) demonstration program began in July 1978 with the award of two separate multiphased contracts for development of a solid process, SRC-I, and a liquid process, SRC-II. The US Department of Energy is expected to choose one of the projects for detailed design and construction by the end of fiscal 1979.
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
Purpose: This preliminary report describes the development and implementation of a project to improve access to literature in Latin American social medicine (LASM).Methods:...Full Text Available
We investigate the possibility of implementing a given projection measurement using linear optics and arbitrarily fast feedforward based on the continuous detection of photons. In particular, we systematically derive the so-called Dolinar scheme that achieves the minimum-error discrimination of binary coherent states. Moreover, we show that the Dolinar-type approach can also be applied to projection measurements in the regime of photonic-qubit signals. Our results demonstrate that for implementing a projection measurement with linear optics, in principle, unit success probability may be approached even without the use of expensive entangled auxiliary states, as they are needed in all known (near-)deterministic linear-optics proposals.
Studies continued on organic tracers for use as hydrologic tracers as part of the Yucca Mountain Site Characterization project. This subject report for the quarter 01/01/93 through 03/31/93 discusses the following issues: project organization and responsibilities; quality assurance program; design control; procurement document control; instructions, procedures, and drawings; document control; control of purchased items and services; identification and control of items; control of processes; inspection; test control; control of measuring and test equipment; handling, storage, and shipping; inspection, test, and operating status; control of nonconforming items and conditions; corrective action; quality assurance records; audits; software quality assurance; and scientific investigation.
The Hyperion project was developed to determine an algorithm for assessing the risk of hydrate plug formation in the pipeline transport oil-water-gas mixtures at low temperatures. The project is a collaboration between physicists, chemists and engineers within the petroleum industry. This paper provided an overview of the project and outlined results obtained as the project entered its third and final year. The main objective of the project has been to understand the inherent mitigation effects of some oils on gas hydrate formation as well as to develop methods of predicting the risk of hydrate plugging. To date, the project has extracted and studied natural inhibiting components (NICs) in oils. Molecular modelling techniques have been used to study hydrate and fluid interfaces in order to estimate the driving force of agglomeration and growth through mechanical ...
This report is a description of the West Valley Demonstration Project`s radioactive waste storage facility, the Chemical Process Cell (CPC). This facility is currently being used to temporarily store vitrified waste in stainless steel canisters. These canisters are stacked two-high in a seismically designed rack system within the cell. Approximately 300 canisters will be produced during the Project`s vitrification campaign which began in June 1996. Following the completion of waste vitrification and solidification, these canisters will be transferred via rail or truck to a federal repository (when available) for permanent storage. All operations in the CPC are conducted remotely using various handling systems and equipment. Areas adjacent to or surrounding the cell provide capabilities for viewing, ventilation, and equipment/component access.
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
Through the dedicated collaborative efforts of many individuals interested in supporting local education, computer laboratories were established at two urban high schools. The purchasing and implementation of the project was handled by the Alliance for Education, a local non-profit education advocate. Funds were supplied by the Air Force as part of a 3-year research activity utilizing artificial intelligence technology to tutor 9th grade students. NCR (now AT7T Global Information Solutions) corporate leaders provided the computers and network equipment at a considerable savings to the project. Each lab is a state-of-the-art facility with air-conditioning, carpeting, special computer tables, computer projection screens, and on-site technical support. Student and teacher enthusiasm toward the project has been gratifying and quantitative results are currently being evaluated for both attitude, skills, and ...
The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)
Space Network Ku-band service. ... Completed GLAST mission schedule and budget assessment .... Utilize Ku band SN link (TDRSS) for science data return ...
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
This document is the annual update of the FFTF and Advanced Reactors Transition Program Resource Loaded Schedule for FY 2002 using current project direction and authorized funding levels
An Environmental Impact Assessment (EIA) study for any project is a time- consuming process because it has a large number of dependent and independent variables that must be taken into account. Although EIAs are dependent on geo-spatial information in order to make an assessment, there are no standard rules for conducting an environmental assessment. In addition, each assessment objective is case-dependent, based on what information is available. This paper presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for projects, based on the integration between remote sensing technology, geographic information systems, and spatial modeling. The framework comprehensively analyzes the environmental vulnerability around the project areas and its impact on the...
Jan 31, 2002 ... Sequential Flow of EDA Functionality for Flow with Separation ...... for Automated Air Traffic Management," AGARD Lecture Series No. ...
Abstract: The NASA Landsat Pathfinder Humid Tropical Deforestation Project mapped global deforestation for the humid tropics. Data sets from both the TM ...
diet and genetic obesity metabolic defects and inflammation. To determine the role of adipocyte death in promoting adipose tissue inflammation and insulin resistance in animal...
... teaching and learning; Creating learning materials and teaching strategies; Developing faculty ... achieve educational innovations. Educational Materials Development (EMD): A project under the former ...
... grants to adopt or adapt courses and materials developed by CCD projects at other institutions, and ... to adopt or adapt CCD-developed courses and materials. -iv- Accomplishments The CCD program has ...
The goal of this effort Composability, Provability, Reusability (CPR) for Survivability is to address the problem of composition of survivable systems. The particular objective of this project is to construct a formal specification of the Java Virtual Mac...
This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.
Abstract The potential impact of climate change on areas of strategic importance for water resources remains a concern. Here, river flow projections for the River Medway, above Teston in southeast England are presented, which is just such an area of strategic importance. The river flow projections use climate inputs from the Hadley Centre Regional Climate Model (HadRM3) for the time period 1960 2080 (a subset of the early release UKCP09 projections). River flow predictions are calculated using CATCHMOD, the main river flow prediction tool of the Environment Agency (EA) of England and Wales. In order to use this tool in the best way for climate change predictions, model setup and performance are analysed using sensitivity and uncertainty analysis. The model's representation of hydrological ...
[Originating_Center='Centro Nacional Patagonico-Laboratorio de Mamiferos Marinos ']. Refine by Category. Please select a field, Projects, Data Centers ...
The next generation of particle accelerator is currently being designed at CERN. An understanding of the market forces in the computer industry will play a crucial role in the success of the project.
... being designed for projected Minotaur IV launch load environments, with design objectives of light weight, integrated vibration isolation, low shock ...
who was appointed in July to lead the Defense Advanced Research Projects Agency, or DARPA, made visits last week to UC Berkeley, Stanford, UCLA and the California Institute of...
Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It the...
with Science, Dr. Barbara McQuiston of the Defense Advanced Research Projects Agency (DARPA), spoke about a few interesting ways the Department of Defense is trying to...
2011 Department of Energy Investments in Carbon Capture Technologies 2010 Smart Meter Installations DOE Recovery Field Projects and State Memos Advanced Vehicle...
The major projects of the Los Alamos National Laboratory's Accelerator Technology Division are discussed, covering activities that occurred during the first six months of calendar 1982.
It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development ...
The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important ...
The project on the free electron laser (FEL) of continuous action of the IR-range with the average power of 100 kW for conducting photochemical studies is described. The electron energy recovery by means of a linear accelerator-recuperator (AR) is applied in the FEL. The FEL and AR basic parameters are presented. It is supposed that the above project will be accomplished in two stages: the first order FEL-AR stage and the full-scale FEL-AR one. The possibilities of applying these facilities are indicated
The objectives of this project are to detect and characterize fractures in a naturally fractured tight gas reservoir, using surface seismic methods, borehole imaging logs, and in-situ stress field data. Further, the project aims to evaluate the various seismic methods as to their effectiveness in characterizing the fractures, and to formulate the optimum employment of the seismic methods as regards fracture characterization.
A series of questions and answers addresses issues related to developing synthetic fuels, including the potential supplies, regulatory road blocks, and development incentives to promote the role of the private sector. Chevron's efforts in the area of synfuels are aimed at shale oil tar sands and coal conversion. The status of these research and development projects and the projected recoverable reserves from each are summarized. (DCK)
The current status and future plans of the Ok Ridge Spallation Neutron Source (ORSNS) are reviewed. The ORSNS is a new project initiated by the U.S. Department of Energy (DOE) beginning October 1, 1995, to prepare the conceptual for a new spallation neutron source. (author) 2 refs.
The objective was to find out whether international research has now provided sufficiently reliable models to assess the corrosion behavior of spent fuel in groundwater and by this to contribute to answering the question whether the highly radioactive used fuel from nuclear reactors can be disposed of safely in a geological repository. Principal project results are described in the paper
This paper shows and describes the actions and methodologies adopted in commercialization of rural electrification projects in Parana State, Brazil. The actions evaluated aims to feasible the techniques to farm owners provides them properties with electric power. 7 figs., 2 tabs., 1 ref.
A detailed definitive cost estimate is given for an ethanol/gasohol storage and blending terminal serving a planned distillery at a Louisiana sugar factory. Included are an analysis of the accuracy of the estimate, labor rates efficiency, materials and labor escalation, as well as detailed calculations for each account of the project. (LEW)
BackgroundTwo randomized controlled trials of lung cancer screening initiated in the 1970's, the Johns Hopkins Lung Project and the Memorial Sloan-Kettering Lung...Full Text Available
Neutron Science Project was started at Japan Atomic Energy Research Institute since 1996 for promoting futuristic basic science and nuclear technology utilizing neutrons. For this purpose, research and developments of intense proton accelerator and spallation neutron target were initiated. The present paper describes the current status of such research and developments. (author)
Sponsored by the Defense Advanced Research Projects Agency the Image Understanding Workshop is a forum for the presentation of new research in vision, image analysis, and geometric modeling. Leading scientists present overviews of projects underway at major universities and corporate research sites, as well as results of individual work. The 1987 volume contains 94 articles and technical reports in two volumes.
The major purpose of the Police Family Life Education Project (FLEP) is 'to develop and deliver a program that will provide police recruits and their immediate family members with stress management education that focuses on the role and responsibilities o...
The IAEA Department of Safeguards established a project in 1996 for the year 2000 (Y2K) conversion activities. This project covered assessment, conversion and testing of the software applications, instrument evaluation software, embedded systems and Personal Computer (PC) hardware attached to various equipment. Significant progress has been made in converting the applications and instruments to be year 2000 compliant. At the same time Member states have made an effort as well in converting the systems used jointly at the facilities
Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.
Although the U.S. aerospace industry continues to be the leading positive contributor to the balance of trade among all merchandise industries, it is experiencing significant changes whose implications may not be well understood. Increasing U.S. collabora...
... News In Practice UK work Key facts & information Mass Balance Projects Resources & Library Technical Area Contacts Site Map Benchmarking solvent waste in the UK furniture manufacturing industry OrganisationBritish Furniture Manufacturers Ltd Project ReportSolvent Waste in Furniture Manufacturing Website: www.bfmenvironment.co.uk Return to list RSWT | Website Design Quiet Storm Solutions Ltd Please consider upgrading your browser! If you can see this ...
The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ...
Activities and results are reported of a project to investigate the application of remote sensing technology developed for the LACIE, AgRISTARS, Forestry and other NASA remote sensing projects for the environmental monitoring of strip mining, industrial pollution, and acid rain. Following a remote sensing workshop for EPA personnel, the EOD clustering algorithm CLASSY was selected for evaluation by EPA as a possible candidate technology. LANDSAT data acquired for a North Dakota test sight was clustered in order to compare CLASSY with other algorithms.
This issue of the newsletter on Engineering Design Activities (EDA) for the ITER Tokamak project contains a report on Second International Industries' Liaison meeting which was held in Tokyo on 2-4 April 1997 (by Y. Kaneki, JAIF, Japan); an overview report on the Blanket project (by A. Cardella, I.Ioki (ITER Central Team), W. Daenner (EU Home Team)); and a progress report on microwave reflectometry (by J. Sanchez, Madrid, Spain).
Decision-making is strongly based on modelling in two of our water supply projects concerning artificial ground water. The model used is a 2-dimensional flow and transport model using the element method. Due to sharp variations in Finnish soils, the modelling process is based on careful and detailed evaluation of basic hydrogeological data before and during model calibration.
Power generated by manufacturers and third-party suppliers in venture capital projects is available to military and other government users at a cost 10 to 20% lower. Tax benefits and other financial incentives keep suppliers' costs low. Users are required to contract for a minimum amount of energy over a 20- to 30-year period. Military use of these energy projects includes sources based on solar energy, cogeneration, geothermal heat, and refuse-derived fuel. (DCK)
Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by ...
We investigate theories of gravitation, in which spacetime is non-Riemannian and the metric g/sub munu/ is nonsymmetric, for ghosts and tachyons, using a spin-projection operator formalism. Ghosts are removed not by gauge invariance but by a Lagrange multiplier W/sub ..mu../, which occurs due to the breaking of projective invariance in the theory. Unified theories based on a Lagrangian containing a term lambdag/sup munu/g/sub / are proved to contain ghosts or tachyons.
Accounts are given of the history of coal liquefaction research and projects (indirect liquefaction, direct liquefaction, plus the recent state of Japanese developments and of process development), and of the significance of the petroleum age, the energy crisis and of coal liquefaction itself. (10 refs.) (In Japanese)
This report for the Swiss Federal Office of Energy (SFOE) presents the overview reports made by SFOE Heads of Program on work done in 2007. Projects reported on in the natural gas-fired fuel cell area include the EU-project REAL-SFOC, the long-term testing of anode-supported SOFC stacks, intermediate-temperature fuel cells based on proton conducting electrolytes, the interdisciplinary ONEBAT project and lifetime-enhancement of SOFC stacks for CHP applications. In the polymer-electrolyte fuel cell (PEFC) area, projects concerning proton-conducting polymer membranes, factors limiting the lifetime of fuel cell membranes, a new highly active oxygen reduction electrode for PEM fuel cell and zinc/air battery applications, the enhancement of PEFC durability and reliability, model-based investigation of PEFC performance, and local gas analysis of PE fuel cells are briefly reported on. Long-term research ...
A proposed project by which the island of Jersy could buy electric power from France is discussed. The interconnector will be capable of transmitting up to 50MW. Included in the project will be 27 km of submarine cable and 23 km of underground cable. An oil-filled cable containing 120 mm diameter copper conductors and weighing 47 kg/m is used. Details of the installation and oil system are given.
The author describes the feasibility study on implementing 18-months fuel cycle project in Daya Bay NPP: content, steps and major results including objective determination, benefit/cost assessment, electric net demands investigation, risk assessment, technical targets
Feasibility study is conducted for introduction of a top pressure recovery turbine (TRT) in China's Panzhihua Iron and Steel (Group) Company, Sichuan Province, for the potential project to simultaneously contribute to abatement of the greenhouse effect gases and to sustainable economic development of the counterpart country. This project considers to adopt the TRTs in 3 blast furnaces (No.1 to 3) of the 4 furnaces in service at the works, producing 2,500,000 t/y of crude steel, where the No.4 furnace is already provided with the model system and not considered in this project. According to the feasibility study results, the total fund required is 5.46 billion yen (Japan-made facilities: 4.172 billion yen, and China-made facilities: 1.288 billion yen), energy-saving effect is 36,467 t/y as crude, greenhouse effect gas emission abatement effect: 112,830 t/y as CO2, and pay-off period is 8.3 years. This plan considers ...
Abstract The success of software projects is quite subjective in nature and is fettered by many risks, the perception of which varies from individual to individual and largely depends on the demographic characteristics of the executives and even the characteristics of the project. This study aims to identify and gauge the software risk dimensions and analyze the differences of perception among executives toward software risks. The contributions of this study untangle the issues underlying risks in the software industry and associates these issues with the perception of the -human- factor present in the industry.
This article examines the developing market for independent power projects in Canada. The topics of the article include bidding in Ontario, the Quebec market, powering British Columbia, and market forces at work in Canada. Discussed are current projects in all stages of completion from bidding to production and includes gas-fired cogeneration, gas-fired combined-cycle electricity generation and cogeneration, wood-waste fired plants, repowering of existing utility plants, and hydroelectric power plants.
The U.S. Department of Energy and EPRI have co-funded this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project investigated catalytic oxidation of vapor-pha...
DescriptionFollowing publication of the Curry report, DEFRA have made a commitment to establish a number of pilot projects supporting a network of demonstration and development farms. These 'farms' are intended to support the process of technology transfer by giving free access to information on the practical application of new, emerging and best practice technologies. Protected Horticulture has been identified as a sub-sector requiring the establishment of one of these projects. One of the major pressures [continued...
Marshall Hall was selected by the US Army Corps of Engineers to participate in the Energy Efficiency Analysis Program. The objective of this program is to assist military installations in identifying energy usage and cost saving projects at their facilities and possibly provide funding for projects. Entech Engineering, Inc. was selected to perform this study.
This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and EDIN-sponsored renewable energy and energy efficiency projects.
Geothermal heat pump systems necessitate a comprehensive approach to geology and building facilities in order to be energetically useful and efficient. Cooperation with geothermal experts should be sought at an early projecting stage in order to obtain reliable data. Geothermal data and the technical facilities of the building must be matched for the project to be both effective and efficient. (orig.)
The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.
The Sacramento Municipal Utility District is developing a number of demonstration projects using geothermal heat pumps. This paper discusses some of the barriers and issues that have emerged over the past two years. The most important barriers are: regulatory impediments; high first cost; and a lack of local design and installation infrastructure.
The report summarizes results of the flue gas desulfurization (FGD) waste disposal field evaluation project sponsored by EPA at TVA's Shawnee steam plant, Paducah, KY. This pilot-scale project, initiated in 1974 and completed in September 1980, evaluated methods and costs for dis...
This report presents the methodologies and results of the field/laboratory experiments and mathematical modeling defined for the phase III of the project. Results from test cases 2-6 are given in separate chapters of the report (which have been indexed separately), and the last chapter discusses the lessons learned from the three phases of the DECOVALEX project.
This demonstration project uses modern simulation techniques to illustrate the important technologies and design variables that an auto-designer would consider in production a high efficiency, low emissions vehicle. Simulation and modeling techniques use the idea of capturing the relationships between real components of the systems with mathematical equations. These equations are then solved on a computer to simulate the behavior or performance of the system under various conditions. In the current demonstration project, we focus on many variations of a hydrogen-powered vehicle.
Compton scatter tomography utilizes the electronic collimation characteristics available through the Compton scattering angle-energy correlation to obtain tomographic images. In this work we present particular aspects of the technique, which are relevant to the inverse radiation transport problem of reducing marginal projection data to radial two-phase flow regime maps. The results indicate a viable technique for the tomographic imaging of tow-phase flow using practical source strengths and reasonably few detectors.
A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly S shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.
Tabulated data are presented from air monitoring studies in the vicinity of the Chalk Point fossil-fuel power plant located in a coastal region of Maryland. (ERA citation 02:057363)
The `biotechnology 2000` project is supervised by the project sponsor `biology, energy, ecology` at Forschungszentrum Juelich on behalf of the Federal Ministry for Research and Technology. The project activities cover the development of techniques and methods, cell biology, gene structure and gene regulation, photosynthetic production processes, biological hydrogen production, synthetic biology, protein design, neurobiological research, biosystems, plant breeding, phytomedicine and plant protection, the biology of waste disposal methods, research into methods which replace animal experiments, biological safety research, technology risk assessment, and ethical aspects. A general survey introduces the promoted projects, and standardized data sheets briefly introduce the individual activities. The appendix gives the project indices, the indices of joint projects, a ...
The Bureau of Mines has two projects in the remote sensing field as it pertains to mining. One of these is a completed contract that studied the use of aircraft mounted cameras and the results of photogrammetry. The second project is an ongoing contract to study the effectiveness of using an instrumentation system wired to remote data collection station to record embankment data. 6 refs.
A central problem in diagnostic radiology is to compare a new X-ray picture with a previous picture and from this comparison be able to decide if anatomical changes have occurred in the patient or not. It is of primary interest that these pictures are identical in projection. If not it is difficult to decide with confidence if differences between the pictures are due to anatomical changes or differences in their projection geometry. In this thesis we present a non invasive method that makes it possible to find the relative changes in the projection geometry between the exposure of a previous picture and a new picture. The method presented is based on the projection slice theorem (central section theorem). Instead of an elaborate search for a single new picture a pre-planned set of pictures are exposed from a circular orbit above the patient. By using 3D Fourier transform techniques we are able to ...
Progress in four research areas on this project are summarized under the following topics: (1) Geminate charge pair recombination in hexane; (2) Fast current measurements resulting from excitation of charge transfer (CT) states; (3) Measurement of the dipole moment of excited states by DC conductivity; and (4) Charge separation at macroscopic interfaces between electron donor and acceptor solids. In a final section, personnel who have contributed to the project during the past budget period are described.
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at ...
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at ...
This article discussed a project formed to develop innovative seismic imaging technologies. The Kaleidoscope project aims to accelerate the processing of seismic sound waves by several orders of magnitude using advanced computer-based techniques to reveal oil and gas deposits buried deep in the earth in a manner that is both cost-effective and efficient. It is expected that the technology will be used in deep water applications with massive untapped reserves. The seismic technology will be used to locate hydrocarbons and oil reserves buried 20,000 feet beneath the seabed. It is estimated that the Gulf of Mexico contains 56 billion barrels of oil equivalent worth nearly $6 trillion. However, the reserves are difficult to locate due to the interbedded salt bodies in the subsurface. The project is simultaneously working on both hardware and software applications, and are currently writing the first petascale set of seismic ...
The Thai-Canadian Nuclear Human Resources Development Linkage Project (the ''Project'') was initiated in 1994 in order to develop the engineering and scientific expertise needed for Thailand to decide whether and how the country can best benefit from the establishment of a nuclear power program. The Project was designed to upgrade current academics and people in industry, and to develop an adequate supply of new technical personnel for academic, industry, utility, regulatory and other government institutions. The key Project objectives included the establishment of a Chair in Nuclear Engineering at Chulalongkorn University, the upgrading of the current Masters level curriculum, the establishment of undergraduate and doctorate level curricula, development and delivery of an industrial training program for people in industry and government, exchanges of Thai and ...
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance ...
Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the ...
In consistency with the increasing requests from Member States for establishing radiotherapy programmes, an IAEA Technical Co-operation project was initiated in Latin America aimed at improving the physical aspects (as a complement to the clinical issues) of quality assurance in radiotherapy; this ARCAL XXX project (RLA/6/032) was classified as a Model Project of the IAEA. Among the important outcomes of the project were (i) the training of a considerable number of medical physicists in hospitals of the region, (ii) the development of a protocol for quality control procedures, and (iii) the organization of quality audit site visits (to the participant countries) where the implementation in hospitals of the developed quality control procedures is verified. The present publication is the protocol for quality control of the physical aspects of radiotherapy. It contains detailed procedures on what should be ...
Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international ...
Floating Production, Storage and Offloading (FPSO) systems have become a popular choice in recent years for marginal, fast-track or deepwater field developments world wide. However, the majority of these developments have incurred significant project delays and budget overruns as a result of commercial structure, project management and design/operating problems. The Health and Safety Executive (HSE) commissioned IGL Engineering Ltd to perform a study to highlight specific areas where safety concerns have arisen. The study also aims to identity the fundamental causes of problems and identify key lessons to be learned from such projects which can be used to the benefit of future developments. In summary, there are five fundamental areas where weaknesses can and have lead to the problems experienced in FPSO developments. The areas are all interrelated and many problems stem from deficiencies in more than one area. The areas ...
This document defines the quality system requirements for the US Department of Energy, Richland Operations Office (DOE-RL), Environmental Restoration (ER) Project at the Hanford Site. The Environmental Restoration Project Quality System Requirements for the Hanford Site integrates quality assurance requirements from the DOE Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), the Hanford Facility Resource Conservation and Recovery Act of 1976 (RCRA) Permit, and applicable Federal and Washington State regulations. This document, based on ten criteria, provides user organizations with the flexibility to incorporate only those criteria and paragraphs applicable to their specific scopes of work. The requirements of this document are to be applied based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities. The user ...
The major problem plaguing the synfuels industry is the financing of large capital requirements in a technologically unproven field. This is exemplified by the 2 to 3 billion dollar investment required by oil shale development. Despite an unquestionable resource which is well characterized and a wealth of information from processes which have undergone extensive pilot development work, financing of a project is difficult because of the risk. In recent studies on a worldwide basis as a background for evaluating the Cottonwood Wash project in the Uinta Basin, Utah, the concept of small scale or modular development of this type of resource can lead to acceptable economics with a substantially higher probability of actual completion. This study discusses Uinta Basin oil shale resources and current developments and evaluates the economics of small scale or modular development for the Cottonwood Wash project processes. This ...
This project is part of PETC`s Advanced Power Systems Program, whose mission is to accelerate the commercialization of affordable, high- efficiency, low emission, coal-fueled electric generating technologies. A process concept - Clear Liquor Scrubbing with Anhydrite Production - was proposed and accepted by PETC as a Phase I project in its Mega-PRDA program. the project integrated three process operations - chloride control upstream of the flue gas desulfurization (FGD) system, a clear liquor process for enhanced SO{sub 2} removal performance, and production of anhydrite (anhydrous calcium sulfate) rather than calcium sulfite or gypsum (calcium sulfate dihydrate). The first step in the project was to perform batch and flow-through experiments in the laboratory to confirm theoretical calculations and preliminary laboratory results concerning anhydrite formation, these laboratory experiments were designed ...
Because of past military operations, lack of upkeep and looting there are now enormous radioactive waste problems in Iraq. These waste problems include destroyed nuclear facilities, uncharacterized radioactive wastes, liquid radioactive waste in underground tanks, wastes related to the production of yellow cake, sealed radioactive sources, activated metals and contaminated metals that must be constantly guarded. Iraq currently lacks the trained personnel, regulatory and physical infrastructure to safely and securely manage these facilities and wastes. In 2005 the International Atomic Energy Agency (IAEA) agreed to organize an international cooperative program to assist Iraq with these issues. Soon after, the Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) was initiated by the U.S. Department of State (DOS) to support the IAEA and assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials. The Iraq NDs Program ...
Most countries have taken the vitrification route for managing High Level Waste (HLW). Depending on composition of site-specific HLW, suitable glass forming oxides are added to it in a melting furnace designed for converting the mixture to a matrix of borosilicate glass. After thorough homogenization, the product is poured into stainless steel canisters as an inert solidified form. Canisters are seal welded and 2-3 such containers are then packed and sealed in another bigger container for providing an additional engineered barrier. This product form is considered safe for long-term storage. The concurrent vitrification technologies employ either induction-heated metallic melters or joule-heated direct resistance-heated ceramic melters. In India, both technologies have been adopted. While older facilities in Trombay and Tarapur employ metallic melters, a retrofitted facility at Tarapur and the new plant at Kalpakkam are based on ceramic melter operations. Compared to the ceramic ...
Renewable Energy Technologies (RETS) have over the years become an integral part of the energy supply chain in most developed countries. Recent projections show that 13.5% of the world's primary energy supply comes from renewable and this figure has an aggregated annual growth rate of 16%. Wind has the highest annual growth rate of 22% while the least annual growth rate of 2% is for hydropower. The main push for renewable like wind in the OECD countries are environmental concerns and the business aspect in power generation. The situation is however completely different in Africa, where the thrust for RETs is developmental based. Although the continent has abundant renewable energy resources like solar, biomass, wind and hydro potential, they have remained largely unexploited. Several efforts have been made to help African countries like Zimbabwe to exploit such resources. The main objectives of this country study included review of Zimbabwe's ...
Case studies were made of the following dislocated worker programs: Cummins Engine Company Dislocated Worker Project; GM-UAW Metropolitan Pontiac Retraining and Employment Program; Minnesota Iron Range Dislocated Worker Project; Missouri Dislocated Worker Program Job Search Assistance, Inc.; Hillsborough, North Carolina, Dislocated Worker Project; Cleveland, Ohio, United Labor Agency Dislocated Worker Project; Houston Community College-Texas Employment Commission Dislocated Worker Project; Tacoma, Washington, ASARCO Copper Smelter Dislocated Worker Project; and Dane County, Wisconsin, Dislocated Worker Project. All of these programs had placement rates higher than those of Comprehensive Employment and Training Act (CETA)-funded demonstrations, and only two of the programs for which a wage replacement ratio could be calculated had ratios ...
The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate ...
The EMS Energy Institute at The Pennsylvania State University (Penn State) has managed the Gas Storage Technology Consortium (GSTC) since its inception in 2003. The GSTC infrastructure provided a means to accomplish industry-driven research and development designed to enhance the operational flexibility and deliverability of the nation's gas storage system, and provide a cost-effective, safe, and reliable supply of natural gas to meet domestic demand. The GSTC received base funding from the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) Oil & Natural Gas Supply Program. The GSTC base funds were highly leveraged with industry funding for individual projects. Since its inception, the GSTC has engaged 67 members. The GSTC membership base was diverse, coming from 19 states, the District of Columbia, and Canada. The membership was comprised of natural gas storage field operators, service companies, industry ...
Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results ...
The White Rose Oil Project, located in the Jeanne d'Arc Basin 350 km east of St. John's, is reported to continue paying benefits for the oil and gas industry in eastern Canada. The operator, Husky Energy, is said to be on target and expects first oil from the project in late 2005 or early 2006. Peak production for the White Rose Field is projected at 100,000 bbl/d. The project has a total capital cost of $2.35 billion. The first phase of the project, comprised of four wells, including an oil producer, was completed in July. The estimated productive capacity of this well is between 25,000 and 35,000 bbl/d. Other major milestones achieved at the White Rose project include movement of the topside modules onto the Sea Rose floating production, storage and offloading (FPSO) vessel, consisting of 17 lifts during the seven-week program. Individual ...
The objective of the three-phase Holly Sugar Geothermal Project was to replace fossil fuels with geothermal energy for sugar beet processing at the Holly Sugar plant located in Brawley, California, in a technically straightforward, economically sound and environmentally acceptable manner. The first phase of the project, discussed in this final report, encompassed the design and analysis of a geothermal industrial heat system for Holly Sugar and addresses: (1) assessment of the geothermal resource; (2) development of a preliminary system design; (3) analysis and publication of an environmental analysis and monitoring report; (4) preliminary economic analyses; (5) dissemination of project related information; and (6) the development of a proposal for the follow-on phases.
This research will be helpful for people to display the 2-dimensiona projective models of 4-variable actual problems in many fields, in order to investigate deeply those actual problems. By using the theory of N-dimensional finite rotation group of the regular polytopes, the author established the 2-dimensional projective model of 4-dimensional rectangular coordinate system, and deduced a transformation matrix, and adopt it to display successfully the 2-dimensional overall shapes of two most complicated regular polytopes 120-Cell and 600-Cell. In the meantime, the author calculated all the vertex coordinates and determine the joint relationships between adjacent vertices of the regular polytopes 120-Cell and 600-Cell. Also, this provided a pattern for displaying the 2-dimensional projective model of 4-variable actual problem.
Integrated resource planning is rapidly emerging as the preferred planning process for electric utilities. Under IRP, planners project the initial and annual operating costs of different resource options and compare them using the revenue-requirements method (RRM)- a project-evaluation technique that discounts future costs (i.e., revenue requirements) into present values. The discount rate used for these computations is usually the firm's weighted-average cost of capital (WACC)-the weighted-average cost of the firm's equity and debt. The project alternative with the lowest present-value revenue requirement (PVRR) (i.e., lowest costs) emerges as the economic choice.
A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of ''passive'' Advanced Light Water Reactors. The effects of aerosols that may result from hypothetical severe accidents are also considered. The construction of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA, has been completed. First steady-state tests have been performed on PANDA. The other facilities are now in their commissioning phases. Scaling studies have guided the design of the experimental facilities. Several small-scale experimental and studies have already produced valuable results which can be used to direct the experimental work, as well as the design of the passive ALWRs. (author). 23 refs, 6 figs.
The Surry low power and shutdown probabilistic risk analysis (PRA) is an ongoing project at Brookhaven National Laboratory (BNL) to identify and quantify potential accident scenarios that may occur in a pressurized water reactor (PWR) during low power and shutdown. It was initiated as a result of various incidents and accidents that have occurred within the United States and overseas. The project involves review and evaluation of PWR experience at shutdown, identification of accident scenarios, determination of methods to mitigate the accidents, and performance a level 1 PRA. An evaluation of accident progression, source terms and consequences has also been initiated. The results will be used to address issues related to shutdown conditions. The objective of this paper is to provide a progress report on the project, and to present the approach used as well as the preliminary results of the ongoing and completed tasks.
This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of research done in the third phase of a research project that investigated components for small heat pump systems that use ammonia as a working fluid. The report includes a summary of the findings of the first two phases of the project and goes on to describe tests done with rotary vane and scroll compressors. The aims of the project are discussed and the work done is listed chronologically. The construction and the components of the test installation are described in detail. Also, the heat pump testing facilities at the University of Applied Science in Rapperswil, Switzerland, are described. The results of the measurements made for various temperature gradients are presented in detail and commented on; also, the various types of compressor tested and other heat pump compressors are compared.
Proper use of quality assurance will provide the basis for an effective management control system for nuclear waste management programs. Control is essential for achieving successful programs free from costly losses and failures and for assuring the public and regulators that the environment and health and safety are being protected. The essence of quality assurance is the conscientious use of planned and systematic actions, based on selecting and applying appropriate requirements from an established quality assurance standard. Developing a quality assurance program consists of using knowledge of the technical and managerial aspects of a project to identify and evaluate risks of loss and failure and then to select appropriate quality assurance requirements that will minimize the risks. Those requirements are integrated into the project planning documents and are carried out as specific actions during the life of the ...
This pilot project was carried out for the purpose of testing methods for active biological monitoring. It covered a period of three years (until September 1994), including two years of exposure. The measurements served to determine pollutant levels in plants used as animal fodder and dust-borne heavy metal concentrations in different sites and, on this basis, to obtain indirect information on human exposure. Among others, the pilot project investigated the suitability of Italian rye-grass as a biological indicator for aluminium, arsenic, cadmium, cobalt, chromium, copper, iron, mercury, magnesium, manganese, nickel, lead, platinum, antimony, titanium, and zinc. (orig./GL).
A polymer-based additive that permanently reduces hardness in wood electrical transmission poles treated with a chromated copper arsenate (CCA) preservative, has been developed by a team of IREQ researchers. A three-phase project is being funded by Hydro-Quebec to evaluate the additive's effect on full-size hydro poles subjected to actual climatic conditions. The evaluation project is designed to test the CCA and the additive's degree of retention by analyzing the hardness measurements against climbing tests, and the washing resistance of the chromium, copper and arsenate in the CCA/polymer-additive treatment. CCA-treated poles will be used for reference. Accelerated aging tests to characterize the polymer's resistance to UV rays will also be part of the validation program.
The objective of this paper is to give an overview on the seismic evaluation and retrofitting procedures of reinforced concrete buildings within JICA technical cooperation project in Romania. The content of the paper covers a) an outline of the seismic evaluation; history and comparison of Romanian seismic design codes with the Japanese seismic evaluation guidelines, b) an outline of the retrofitting techniques which were transferred from Japan to Romania and structural tests for retrofitting techniques employed in Romania and c) retrofitting details that were used by JICA/NCSRR in the retrofitting design of two vulnerable buildings in Bucharest. The above-mentioned retrofitting projects are now under development of detailed design and therefore, in the near future, refining and improvement of solutions will be performed. (authors)
The confluence of technology development and market readiness is opening up major business opportunities for photovoltaic (PV) systems throughout the developing world. The National Renewable Energy Laboratory (NREL) and Sandia National Laboratories in Abuquerque (Sandia), working on behalf of the U.S. Department of Energy, have launched pilot projects in several countries throughout the world over the past 3 years. The focus of these pilot projects has been the development of in-country institutional capabilities necessary to deliver the promise of PV electricity to the rural populations. In addition to country-specific activities, NREL is conducting several technology, information, and partnership projects focused on further accelerating the education, training, business, and technology developments necessary to bridge the gap between promise and reality. This paper summarizes these efforts.
Just below the Arctic Circle, about 200 kilometres off the Helgeland coastal region of Norway, lies the Skarv oil and gas field. Discovered in 1998, the greater Skarv development project now includes the Idun gas field. The Skarv development has begun to take shape, now roughly half-way to commencement, so Scandinavian Oil-Gas Magazine decided it was time to take a look at the project's progress thus far and what's left to do before production that's slated to begin in late summer, 2011. The Skarv Project include subsea wells connected to a floating production storage and offloading (FPSO) vessel to process oil and condensate and a gas export pipeline that ties back to the Aasgard Transport system. (AG)
Variability in production is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced practical limitations in their application. A multiobjective analytic model (MAM) is proposed to develop a graphical solution for the design of Work-In-Process (WIP) Bf in order to overcome these practical limitations to Bf application, being demonstrated through the scheduling of repetitive building projects. Multiobjective analytic modeling is based on Simulation?Optimization (SO) modeling and Pareto Fronts concepts. Simulation...
ABB High Voltage Cables AB started the MPS (More Power Submarine cables) project in 1993 with a view to exploring new technology opportunities. The goal is to design and type test a submarine HVDC cable for a capacity of 1200 MW at 600 kV. On the day before ABB announced its success in winning the contract for the world`s largest ever submarine HVDC link project for the gigantic Bakun project in Malaysia, ABB Power Systems described progress to date at a symposium in Karlskrona. The proceedings included a test demonstration on an extruded cable which eventually broke down at a stress of over 935 kV -not in the insulation itself but in the end terminations. The electric field was in excess of 200 kV/mm which is higher than ever before reported. (UK)
To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No ...
Information technology allows national and local governments to satisfy the needs of citizens in a cost effective way. Unfortunately, citizens still tend to prefer traditional, more costly channels, such as the front desk, phone and mail. Through pilot projects government agencies attempt to influence this behavior of citizens, directing them towards the online channel. With this paper we provide insight into the possibility to influence citizens' behavior in the complex landscape of multi-channel service provision. The paper systematically compares five pilot projects using a framework that is based on organizational and marketing literature. The results show that socio-psychological factors are crucial in multi-channel management, much more than the technology itself. We conclude that ci...
Four interrelated projects are underway whose purpose is to migrate the LAMPF-PSR Accelerator Complex control systems to a system with a common set of hardware and software components. Project goals address problems in performance, maintenance and growth potential. Front-end hardware, operator interface hardware and software, computer systems, network systems and data system software are being simultaneously upgraded as part of these efforts. The efforts are being coordinated to provide for a smooth and timely migration to a client-sever model-based data acquisition and control system. An increased use of the distributed intelligence at both the front-end and operator interface is a key element of the projects. 2 refs., 2 figs.
Biomass combustion is an important part in a sustainable energy system, but as well a source of submicron (particles < 1 #mu#m) particles in the air. Consequently, to obtain a good air quality together with increased biomass combustion there is a need for a better understanding of particle formation. This work is a part of a larger project about formation and emissions of particles from biofuel combustion. The report includes the work performed in the project during the year 2004. The aim of the project is to describe the release of inorganic components, which cause particle emissions, during combustion of single fuel particles of biofuel, e.g. wood pellets. The work is carried out by emission measurements, systematic combustion experiments and modelling work. The results are expected to contribute to the understanding of which parameters that influence the formation of fine particles and thus gain a better insight into ...
There are two fundamental reasons or motivations for energy conservation: (1) economics; and (2) consideration of energy - its sources and availability. Economics speaks for itself and needs little explanation: a project is undertaken, the cost is recovered in a given period of time (we hope) and our company realizes cost savings thereafter. We study and propose a project; we estimate the payback. If approved, we implement the project. Then, we eagerly watch for its effectiveness - for the proposed payback. The second consideration in regard to energy conservation might - in the foreseeable future - become by far the most important - that of availability. Very knowledgeable persons have stated that this - in reality - is the most serious problem facing our nation today. Readily available, reasonably priced energy has given to the US the high form of living experienced today. An interruption in this flow could catapult our ...
Fundamentals of economic evaluation of projects to produce electricity using geothermal energy are described. Steps to obtain the basic data used to calculate the present value and the internal rate of return are described. Finally, a criterion to make an economical evaluation to take the best investment selection is shown, applied to a geothermal project in the Los Azufres, field Michoacan, Mexico. [Espanol] En este articulo se describen los diferentes topicos que se desarrollan para llevar a cabo la evaluacion economica de un proyecto para generar electricidad, desde la recopilacion de datos hasta la obtencion de los indices necesarios para la toma de decisiones, y su aplicacion a un proyecto geotermoelectrico situado en el campo de Los Azufres, Michoacan, Mexico.
ContextCost advantage has been one of the primary drivers of successful offshoring engagements of Indian software and services companies. However, the emphasis has shifted to the ability of the vendors to provide high quality over cost advantage in delivering software products and services. Meeting high quality requirements of the clients is a challenge due to the very nature of development and delivery of software through offshoring. ObjectiveThe objective of this research paper is to identify and evaluate the key determinants of quality in the case of software projects delivered through offshoring model. MethodA detailed survey was conducted among project managers/project leaders (leads) of a leading midsize Indian IT services company to evaluate the relationship of the determinants on t...
In accordance with federal legislation, the U.S. Department of Energy (DOE) has conducted a project to demonstrate use of its Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High-Rise Residential Buildings; Mandatory for New Federal Buildings; Interim Rule (referred to in this report as DOE-1993). A key requisite of the legislation requires DOE to develop commercial building energy standards that are cost effective. During the demonstration project, DOE specifically addressed this issue by assessing the impacts of the standards on (1) construction costs, (2) builders (and especially small builders) of multi-family, high-rise buildings, and (3) the ability of low-to moderate-income persons to purchase or rent units in such buildings. This document reports on this project.
A large number of proven technical solutions exists for the use of renewable energies. However, their dissemination is still too slow to meet the political goal of substituting for 8-15% of the primary energy demand in the European Union by the year 2010. Even renewable energy systems (RES) with an economic potential are only partly exploited. The FIRE research project financed partly in the JOULE program analyses and compares the means of financing RES in Austria, Denmark, Germany, the Netherlands, Spain, Sweden and the United Kingdom to put forward best practice recommendations so that renewable energy depolyments will occur at a faster rate. FIRE addresses to politicians, to potential investors and to project-developers. (orig./RHM)
The U.S. Department of Energy (DOE) Office of Pollution Prevention (EM-77) created is successful internally competed program to fund innovative projects based on projected returns. This is called the Return-on-Investment (ROI) program. EM-77 conducted a successful ROI pilot, developed and implemented sound management practices, and successfully transferred the program to several Operations Offices. Over the past 4 years sites have completed 262 ROI projects (costing $18.8 million) with claimed first-year savings of $88 million and claimed life cycle savings exceeding $300 million. EM-77 requested that Oak Ridge National Laboratory perform an independent evaluation of the site-led, DOE-HQ-funded pollution prevention (P2) ROI program to assist the Department in determining whether claimed savings are real.
Technologies and practices that recover energy and materials from municipal solid waste present a technically and economically viable alternative to sanitary landfills and other solid waste disposal methods. However, community planners considering resource recovery should be aware of the potential environmental impacts of proposed projects. To assess these impacts, a planner should: identify the most significant types of impacts; establish boundaries beyond which impacts are not significant; characterize the environment as it would exist without the proposed project over the project's lifetime; predict the magnitude, and the distribution over time and space, of potential impacts; and relate the magnitude of predicted impacts to a scale of significance that will allow environmental values to be considered in decision-making. 24 references, 1 table.
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
Purpose - The purpose of this paper is to encourage other libraries to provide access to their own original content via the web. By way of case study, the process of identifying materials, scanning them and creating web access to original content will be explored. Design/methodology/approach - To implement a book digitization project, three major things need to be present. The library must own material that was published prior to 1923, making them safely out of copyright in the USA; the library needs access to server space on the web and the library needs to own scanning equipment. Findings - This project demonstrated that a library does not necessarily need to obtain grant funding to begin an effective and successful digitization program. It also revealed a few things that would improve t...
This compilation contains 44 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1995. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 54 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1989. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1 -- ACRS Reports on Project Reviews, and Part 2 -- ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1988. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1, ACRS Reports on Project Reviews, and Part 2, ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. 136 refs., 1 tab.
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1987. It also includes a report to the Congress on the NRC Safety Research Program for FY 1988. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
This compilation contains 31 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission or to the Executive Director for Operations during calendar year 1990. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subject. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
Progress made during the first phase effort of the Solar-Thermal Full-System Experiment is summarized. This is one of a number of projects in the Solar-Thermal Subprogram involved with the development of solar central receiver hardware and systems for future use by utilities. The main emphasis is on systems that use Brayton-Cycle (gas turbine) equipment. The project summarized involves the planning and design of a complete Brayton-Cycle solar central receiver experimental system that would include all components of a commercial-size electric utility solar power plant. The objective of the overall project is to demonstrate the technical feasibility of a complete Brayton-Cycle, solar-fossil hybrid central receiver system. Major objectives of the Phase I effort summarized are to plan and design the experiment in detail and to organize a utility Test and Operating Group that would be directly involved in the development and ...
Oct 20, 1997 ... The following requirements apply to the solar array: ..... housings will be coated with material meeting the program's outgassing requirements. ... The solar array temperature testing requirements will be determined by analysis. .... The ADS also generates attitude products for the project and science team. ...
This report describes a quality assurance program plan for the Yucca Mountain Project. Aspects of the plan include: document control, equipment maintenance and calibration, process control, audits, computer software, and inspections. (CBS)
This report summarizes the research done on artificial photosynthesis by the Calvin Group between 1970 and 1995 when the program was terminated. It contains a compilation of the personnel involved as well as a bibliography of publications supported by the project.
Geographic information system (GIS) technology is now being used by wind energy developers who are required to consider and accommodate a wide variety of environmental and social considerations. This poster presentation discussed some of the new features available in current GIS technologies. High resolution imagery from satellites is being used to verify the accuracy of collected spatial data, as well as to investigate potential locations for meteorological towers, turbine sites, and roads. Slopes are easily calculated using GIS software tools, and digital elevation data can be used with high resolution aerial photography to determine routes for new roads and to establish available sites for crane pads. The GIS tools allow developers to consider protected ecological areas, wetlands and forests, and gives them the ability to better report project development considerations at public consultations. Wind resource grid outputs can also be ...
The goal of the railplug project is to commercialize this miniaturized railgun as an engine technology as rapidly as possible. To improve the technology transfer process, a board of industrial advisors was established. A list of representatives is included at the end of this annual report. The Railplug External Advisory Board (REAB) met in Austin on March 17--18, 1991 to discuss the project plan. A list of comments from the REAB is included at the end of this progress report, along with our written response to those comments. An alternate ``first`` meeting with some representatives of the REAB was held on July 9, 1991. This meeting was attended by most of the board members who were unable to attend the first meeting. The second meeting of the REAB was held in Toronto, Canada, on October 10, 1991. A list of the board members comments from this meeting is included at the end of this report, along with our written response to those comments. These ...
The goal of the railplug project is to commercialize this miniaturized railgun as an engine technology as rapidly as possible. To improve the technology transfer process, a board of industrial advisors was established. A list of representatives is included at the end of this annual report. The Railplug External Advisory Board (REAB) met in Austin on March 17--18, 1991 to discuss the project plan. A list of comments from the REAB is included at the end of this progress report, along with our written response to those comments. An alternate first'' meeting with some representatives of the REAB was held on July 9, 1991. This meeting was attended by most of the board members who were unable to attend the first meeting. The second meeting of the REAB was held in Toronto, Canada, on October 10, 1991. A list of the board members comments from this meeting is included at the end of this report, along with our written response to those ...
During the last few years, research on toxicologically relevant properties of engineered nanoparticles has increased tremendously. A number of international research projects and additional activities...Full Text Available
BackgroundHIV/AIDS is a major public health concern in Uganda. There is widespread consensus that weak health systems hamper the effective provision of HIV/AIDS services. In recent...Full Text Available
The divertor 'Large Project' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, ...
Oct 2, 2007 ... The Payload combines some of the most sensitive particle sensors .... provide state-of-the-art measurements of incoming x-ray, ultraviolet, .... It will be launched into a low-Earth orbit on a Delta 7320 rocket in September 2004. ...
Methods and materials employed by NCL to reclaim treatment of overburden dumps in opencast projects are described. These involve controlling slope stability and erosion (for example by covering with geosynthetic composites or jute/coir mat) and installing a drainage system before planting trees, shrubs and grass. 1 photo.
This paper presents the history and objectives of the development of a standard method for the measurement of organic contaminants in biomass producer gases. Recently, a project with that title has started in the European 5{sup th} Framework Programme. The structure of this project with acronym 'Tar Protocol' is also described in this paper. The project is performed by 17 partners and continues earlier work initiated by IEA (International Energy Agency), DoE (Department of Energy) and EU (European Union) in 1998. The project aims to combine two draft Protocols that resulted from this earlier work. The Tar Protocol will be developed for accurate measurement of organic contaminants ('tars') over a large range of concentrations (1 mg/Nm{sup 3} to 100 g/Nm{sup 3}) and conditions (0 - 900 deg C; 0.9 - 60 bars). Besides, a particulate concentration will be determined too. ...
OPERATE AT SOUTH POLE WINTER AMBIENTS, GIVEN THE PROJECT'S BUDGET AND TIME LINES . ... 17 MAXIMUM ELECTRICAL LENGHT CONSTRAINED BY Ku-BAND AT 50 FT. ... A MAXIMUM LENGTH OF 50 FEET HAS BEEN SPECIFIED BY THE SYSTEM LINK CALCULATIONS TO ...
The advanced technologies of Ka-Band systems such as high gain spot .... sometimes used based on link requirements for a specific application. .... received at NASA LeRC from a Ku-band satellite and retransmitted to the USAT at Ka-Band. .... and to the Office of Management and Budget, Paperwork Reduction Project ...
Objectives To evaluate the extent to which intensive care units participating in the initial Keystone ICU project sustained reductions in rates of catheter related bloodstream infections.Design...Full Text Available
Project ZEUS was designed to characterize the effects of long-term gamma irradiation on free-ranging meadow voles, and to determine the lowest level of radiation at which biological effects are discernible in the population. Behavioural tests are consider...
China’s methadone maintenance treatment program was initiated in 2004 as a small pilot project in just eight sites. It has since expanded into a nationwide program encompassing more than 680...Full Text Available
This report for the month of June 1995 presents information on the typical topics of tritium processing, environmental studies, waste management issues, and miscellaneous projects. The document consists many small reports by individuals or small groups.
We have constructed a deletion-mutant rabies virus encoding EGFP and find it to be an excellent tool for studying detailed morphology and physiology of neurons projecting to injection sites...Full Text Available
Standard Practice for Military Marking. MIL-STD-130. K. 1/15/00. Identification Marking of U.S. Military Property. MIL-STD-2073-1 D. Notice 1. 12/15/99. 05/10/ 02 ...
Technologies for materials, processes, and manufacturing that will provide safe, .... advanced energy conversion techniques, and pulsed inductive and ... duration antimatter storage and transportation, and methods for utilizing ...... EVA systems can be found in the EVA Technology Roadmap of the EVA Project Plan. ...
The project is currently on schedule. The design review meeting was held on 08/26/97 at the Coastal Systems Station in Panama City, Florida. The mechanical arrangement, performance analysis and design features were presented at the review meeting. A numbe...
Jun 28, 2000 ... Right now, my biggest project is working with students. ... RE: [Joni- JoniHarbottle/stilwellMiddleSchool] I have 2 dogs, ... you have to go through the military or any other special services to be the payload scientist? ...
Jan 15, 2004 ... thought I would have a difficult time working with. ...... they were absolutely right, because everybody said it rained cats and dogs on the orbit ...... We know that in the military. You can ask any military ...
The overall objective of this project was to use molecular genetics to develop strains of bacteria with enhanced ability to remove sulfur from coal, and to obtain data that will allow the performance and economics of a coal biodesulfurization process to be predicted. (VC)
A brief profile of Janet Doe is given. Twenty-five years of library automation are reviewed from the author's point of view. Major projects such as the SUNY Biomedical Communication Network and the...Full Text Available
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
This is an overview of the present-day versions of monadology with some applications to vector lattices and linear inequalities. Two approaches to combining nonstandard set-theoretic models are sketched and illustrated by order convergence, principal projection, and polyhedrality.
We present a methodology and database mediator tool for integrating modern knowledge-based systems, such as the Stanford EON architecture for automated guideline-based decision-support, with legacy...Full Text Available
Progress is briefly summarized for a large number of projects in the areas of research instruments, measurement and controls engineering, reactor systems, and maintenance management. (LEW)
This Public Design Report provides, in a single document, available nonproprietary design -information for the ``Innovative Coke Oven Gas Cleaning System for Retrofit Applications`` Demonstration Project at Bethlehem Steel Corporation`s Sparrows Point, Maryland coke oven by-product facilities. This project demonstrates, for the first time in the United States, the feasibility of integrating four commercially available technologies (processes) for cleaning coke oven gas. The four technologies are: Secondary Gas Cooling, Hydrogen Sulfide and Ammonia Removal, Hydrogen Sulfide and Ammonia Recovery, and Ammonia Destruction and Sulfur Recovery. In addition to the design aspects, the history of the project and the role of the US Department of,Energy are briefly discussed. Actual plant capital and projected operating costs are also presented. An overview of the integration (retrofit) of the processes into the ...
Work on this coke oven gas cleaning demonstration project (CCT-II) this quarter has been focused on Phase IIB tasks, and include engineering, procurement, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. Engineering efforts are nearly complete. Remaining to be finalized is an assessment of electrical heat tracing/insulation needs for pipe lines, assessment of fire protection requirements, and instrument modifications. Procurement of all major equipment items is complete, except for possible additions to fire fighting capabilities. Major focus is on expediting pipe and structural steel to the project site. Civil construction is complete except for minor pads and bases as required for pipe supports, etc. Erection of the hydrogen sulfide and ammonia scrubber vessels is complete. Installation of scrubber vessel internals ...
All of the project work since the previous report has been on Phase 2B tasks. Therefore, this quarterly progress report summarizes the period's activities in Engineering, Procurement and Civil Construction. Engineering is 95% complete, but revisions and changes are still being incorporated particularly in the Instrument and Electrical areas. Procurement has only valves 4 in. and above yet to order to complete all major items purchased. The scheduled material curve was based on the original estimate of the job. The projected curve reflects the previous month's estimate. Construction of civil work is proceeding according to schedule in the field. The initial bid packages for the Mechanical General Contractor portion of the work have been reviewed and evaluated. Order placement is scheduled for the end of July. The Electrical package is due back from the bidders on July 6. It requires additional evaluation by BSC and DSO and will ...
Research programs, presented at the contractor's review meeting on indirect liquefaction, are presented on the following topics: oxygenates (methanol) synthesis; Fischer-Tropsch synthesis; product upgrading; and process support engineering evaluations. A total of 18 reports are included. Individual projects are processed separately for the data bases. (CBS)
Aug 25, 2004 ... Current Developments in Future Planetary Probe Sensors: .... Data: Outgoing and incoming EIA RS-422 interface for serial data transmission (for electrical purposes only, .... Milos, et. al, Journal of Spacecraft & Rockets 1999 ...
The purpose of this project was to build a long-range, parallel hybrid gas/electric vehicle capable of driving beyond the communter capabilities of series hybrid vehicles. It was envisioned that since the gas engine would be able to independently propel t...
Foreward: Preface; Introduction; The natural science of global climate change; Land and water use; Coastal zones and oceans; Energy and industry; Energy and social systems; Technological change; and Sponsoring organizations, International Advisory Board, and project participants.
BackgroundThe long-term goal of the GKDZI (Genetics of Kidney Disease in Zuni Indians) Study is to identify genes, environmental factors, and genetic-environmental...Full Text Available
The authors map the route undertaken by the Project Management Office of the Gansu Basic Education Project (GBEP) in Gansu Province, China, in instituting measures to ensure good learning opportunities for children with special educational needs within the four poor counties benefiting from this DFID supported project. The main purpose of GBEP has been to increase enrolment and retention in these poor, minority areas so as to achieve universal basic education. As general enrolment increased so did that of pupils with special needs, the educational needs of which the schools began responding to in an unconscious way. However, at the start there was little understanding at the classroom and management levels of how to ensure access to learning as well as access to school. The authors map out the road to change and the methods undertaken to change practice at various management and classroom levels so as to enable schools to ...
Cooperation for low carbon and energy efficient development is a high priority for France, in line with the United Nations Framework Convention on Climate Change. France contributes to tackling climate change by working with its partners on all continents to implement projects both to mitigate greenhouse gas emissions and to adapt to climate change. Within the framework of the Marrakech Accords, France also encourages the implementation of the Kyoto Protocol Clean Development Mechanism, in particular between French business and non-Annex I countries; this mechanism will facilitate the financing of mitigation projects and contribute to the sustainable development of host countries in the South. At multilateral level, France is a major donor. At a bilateral level, an initial analysis of cooperation projects which are strongly linked to tackling climate change identified public support of 136 millions euros per year, as an ...
A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons ...
The core of Prismatic Modular Reactor (PMR) consists of assemblies of hexagonal graphite fuel and reflector elements. The core bypass flow of Very High Temperature Reactor (VHTR) is defined as the core flow that does not pass through the coolant channels but passes through the bypass gap between fuel elements. The increase in bypass flow makes the decrease in effective coolant flow. Since the core bypass flow has a negative impact on safety and efficiency of VHTR, core bypass phenomena have to be investigated to improve the core thermal margin of VHTR. For this purpose, the international project, I-NERI project, has been carried out since 2008. I-NERI project is collaborative project that KAERI and SNU of Korea side and INL, ANL and TAMU of U.S side are involved. In order to evaluate the core bypass flow, the multicolumn and multi-layer experimental facility is designed by SNU. In this experiment, the ...
Phox2b-expressing neurons of the retrotrapezoid nucleus (RTN) located in the ventrolateral brainstem are sensitive to changes in PCO2/pH, have excitatory projections...Full Text Available
Air pollution abatement measures are not an end in themselves, and undesirable side effects should be taken into account. The proposed emission index takes into account the total emissions caused by a technical project as well as the effects of the individual pollutants.
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
A project on the title is a special study of TRC (Technology Research Center) Japan National Oil Corporation, which aims at developing a system collecting many data near well bottom while drilling. The project is a 3-year project from 1993 to 1995 succeeding to results of a project on real-time drilling control technology which was finished in fiscal 1992. This paper is a record in fiscal 1993. In 1993, the first year, TRC starts a joint study with relational enterprises aiming at utilizing an EM-MWD (electromagnetic-measurement while drilling) system practically. Based on the past fruit of the study, the EM-MWD system was applied to an highly inclined well or a horizontal well. A total system was constructed, which improved electromagnetic radiation transmission efficiency, and reliability, and workability. An electromagnetic radiation receiver system for an offshore drilling rig was developed. A well ...
Short-hairpin RNA (shRNA)–mediated gene knockdown is a powerful tool for targeted gene silencing and an emerging novel therapeutic strategy. Recent publications, however, reported unexpected...Full Text Available
Research programs on coal liquefaction are presented. Major topics include: coprocessing, two-stage liquefaction, low severity liquefaction, coal/catalyst and liquefaction chemistry. Individual projects are processed separately for the data bases. (CBS)
Research programs, presented at the contractor's review meeting on direct liquefaction, are presented under the following topics: two-stage liquefaction; coprocessing; and advanced research on coal liquefaction. A total of 20 reports are included. Individual projects are processed separately for the data bases. (CBS)
The University of Georgia, in collaboration with GE Global Research, has investigated the relevant quenching mechanism of phosphor coatings used in white light devices based on UV LEDs. The final goal of the project was the design and fabrication of a high-efficacy white light UV-LED device through improved geometry and optimized phosphor coatings. At the end of the research period, which was extended to seamlessly carry over the research to a follow-up program, we have demonstrated a two-fold improvement in the conversion efficiency of a white light LED device, where the increase efficacy is due to both improved phosphor quantum efficiency and lamp geometry. Working prototypes have been displayed at DOE sponsored meetings and during the final presentation at the DOE Headquarters in Washington, DC. During the first phase of the project, a fundamental understanding of quenching processes in UV-LEDs was obtained, and the relationships that ...
The University of Georgia, in collaboration with GE Global Research, has investigated the relevant quenching mechanism of phosphor coatings used in white light devices based on UV LEDs. The final goal of the project was the design and fabrication of a high-efficacy white light UV-LED device through improved geometry and optimized phosphor coatings. At the end of the research period, which was extended to seamlessly carry over the research to a follow-up program, we have demonstrated a two-fold improvement in the conversion efficiency of a white light LED device, where the increase efficacy is due to both improved phosphor quantum efficiency and lamp geometry. Working prototypes have been displayed at DOE sponsored meetings and during the final presentation at the DOE Headquarters in Washington, DC. During the first phase of the project, a fundamental understanding of quenching processes in UV-LEDs was obtained, and the relationships that ...
This Final Technical Report provides an account of the project for the demonstration of Black Liquor Gasification at Georgia-Pacific LLC's Big Island, VA facility. This report covers the period from May 5, 2000 through November 30, 2006.
The main problems encountered during the operation of horizontal steam generators are considered. Design features of the new PGV-1000MK and PGV-1500 steam generators are analyzed.
The objective of this project is to reduce energy consumption in 203 buildings by providing a new EMCS (Energy Monitoring Control System) to control and monitor systems.
DOE is supporting the development of several conversion processes that are currently in the pilot plant stage. Each of these processes is described briefly and information given as to contractor, contract, funding, site and current progress. Several support projects are treated similarly. (LTN)
The CleverFarm project started out to build an integrated monitoring system for wind farms, where all information would be available and could be used across the wind farm for maintenance and component health assessments. This would enable wind farm operators to prioritise their efforts, since they have a good view of the farm status from home. A large emphasis was placed on the integration of condition monitoring approaches in the central system, enabling estimates of the remaining lifetime of components, especially in the nacelle. During the 3,5 years of the project, software and hardware was developed and installed in two wind farms in Denmark and Germany. The connected hardware included two different condition monitoring systems based on vibration sensors from Gram&Juhl and ISET, plus a camera system developed by Overspeed. Additionally, short-term predictions of the wind farm output were delivered by DMI and Risoes Prediktor system ...
Results of feasibility experiments for determining the mineral content of individual stains on special Sensitized Paper are presented. The stains were formed on the paper by the impaction of laboratory generated salt water droplets. Of the techniques exam...
This report documents the operation, maintenance, calibration, data acquisition and data reduction at the Chalk Point Meteorological Station for the period November 15, 1978 through November 15, 1979. Climatological data summaries for each month and calib...
subject to a learning curve which should help to lessen the user's time at KSC. An MMSE Payload Handling Fixture has ...... (F4.I ASSlUN IASILlM.ny.CTC I ...
This paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary micro-computer based cost estimating systems for hazardous waste remediations. he U.S. EPA system, "Remedial Action Cost Estimating System" (...
This project addresses the problem of flue gas desulfurization (FGD) sludge disposal to land. Specifically, the chemical species of FGD sludge constituents are thermodynamically modeled using the equilibrium constant approach, in an attempt to predict the constituent concentratio...
BackgroundIn 1988, the SPILI project was established in order to evaluate the cardiovascular disease (CVD) risk profile of the inhabitants of Spili, in rural Crete, Greece. The first...Full Text Available
This article outlines research and progress into the liquefaction of coal by solvent treatment, being conducted at the National Research Institute for Pollution and Resources, Japan. (In Japanese)
2 ...Amount received and number years supported Project Duration: 2 years Funding received from APN in Year1: US$...00 Funding received from APN in Year 2: US$40,000.00
The Plan identifies the Army's organization, goals, objectives, and policies with respect to energy. It projects energy consumption and costs to the year 2000 and summarizes the programs required to support the long range goals. A summary of current and needed energy related legislation is included. (Author)
During formation of the optic projection in astray/robo2 mutant zebrafish, optic axons exhibit rostro-caudal pathfinding errors, ectopic midline crossing and...Full Text Available
Background and AimsPlants from the family Lemnaceae are widely used in ecological engineering projects to purify wastewater and eutrophic water bodies. However, the biology of nutrient...Full Text Available
The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to ...
The goal of this LDRD was to demonstrate the use of robotic vehicles for deploying and autonomously reconfiguring seismic and acoustic sensor arrays with high (centimeter) accuracy to obtain enhancement of our capability to locate and characterize remote targets. The capability to accurately place sensors and then retrieve and reconfigure them allows sensors to be placed in phased arrays in an initial monitoring configuration and then to be reconfigured in an array tuned to the specific frequencies and directions of the selected target. This report reviews the findings and accomplishments achieved during this three-year project. This project successfully demonstrated autonomous deployment and retrieval of a payload package with an accuracy of a few centimeters using differential global positioning system (GPS) signals. It developed an autonomous, multisensor, temporally aligned, radio-frequency communication and signal processing capability, ...
The major projects of the Los Alamos National Laboratory's Accelerator Technology Division are discussed, covering activities that occurred during the first six months of calendar 1982.
Feb 19, 2009 ... Standard Practice for Military Marking. MIL-STD-130. K. 1/15/00. Identification Marking of U.S. Military Property. MIL-STD-2073-1. D. Notice 1 ...
On the Dutch North Sea coast, at the Westereems wind farm, the energy supplier Essent is currently implementing one of Europe's largest repowering projects. A total of 88 new wind turbines are going up at Dollart Bay. (orig.)
Large-scale cancer genome projects will soon be able to sequence many cancer genomes to comprehensively identify genetic changes in human cancer. Genome-wide association studies have also identified...Full Text Available