In July 1997, a field inspection was carried out of parts of the tunnel system of the Tonstad hydroelectric power station, Norway. This report discusses the findings: (1) The main drift has a varying bottom covering of sediments, (2) The tunnel to Ousdal had on its downmost 2 km an almost unbroken and apparently stable armour layer along the walls and an unstable or incomplete armour layer in the middle, (3) The tunnel to Homstoel almost had no bottom layer, (3) Sediments in side inlets and niches are of two kinds: (a) masses added through side inlets, (b) fine sand and mud deposited by the main tunnel, (4) A few cases were observed of downfallen rocks and of peeled rock of about 1 m size. It looks as if the Homstoel tunnel may have been previously used for larger discharges than that from Ousdal and that the latter is now being used to the limit of what the previously established armour layer can stand
The windmill industry in Denmark is currently confronted with making a choice between competing technologies so that the role of the stimulus of state subsidies for research has lately increased in importance. The Ministry of Energy, it is claimed, must be aware of this as possibilities for making use of research results are dictated by the market and competition. The industry is not sympathetic to the idea of state research contracts with specified goals for which manufacturers must produce a technical solution. Consultancy firms should work towards solving general problems which could help the industry as a whole. Wind turbines which are cheap to produce and operate are of more interest to industry than those which are technologically advanced or of a lighter construction. It is not thought to be advantageous to concentrate the allocation of subsidies on one key project chosen by the Ministry itself, such as the current intense interest in turbine blades. Aerodynamics, noise ...