This ETP defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS)Spray Wash Trailer.
Project methodology, analysis of the occupational and training situation, task analysis process, design process for a systematic training plan specific to the job position are described.
Feb 6, 2003 ... Director, Plans and Programs, Headquarters Air Force Materiel Command, .... Commander of the Joint Task Force Southwest Asia at Prince ...
This report describes a quality assurance program plan for the Yucca Mountain Project. Aspects of the plan include: document control, equipment maintenance and calibration, process control, audits, computer software, and inspections. (CBS)
This quality assurance plan (QAP) is designed ensure that the methodologies and the data used for environmental cleanup and treatment studies at the Nevada Test Site are both usable and defensible. The QAP serves two purposes in this regard: (1) to guide the preparation of procedures for carrying out the tasks of the Basic Environmental compliance and Monitoring program (BECAMP); and (2) to help management track the progress of those tasks.
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and ...
This operation plan covers the period of operations from the time major elements of the joint task force are deployed in the forward area until the completion of on-site operations. It was published for planning purposes only, always subject to periodic revision and refinement as more detailed information became available. ENIWETOK-BIKINI Danger Area, as the term is used in this plan, is that area encompassing ENIWETOK and BIKINI ATOLLS and bounded by the meridians 160 deg 35' - 166 deg 16' east longitude, and by the parallels 10 deg 15' - 12 deg 45' north latitude (an area of 150 by 350 miles).
During this quarter, work began on the regional structural and geologic analysis of the greater Green River basin (GGRB) in southwestern Wyoming, northwestern Colorado and northeastern Utah. The ultimate objective of the regional analysis is to apply the techniques developed and demonstrated during earlier phases of the project to sweet-spot delineation in a relatively new and underexplored play: tight gas from continuous-type Upper Cretaceous reservoirs of the GGRB. The primary goal of this work is to partition and high-grade the greater Green River basin for exploration efforts in the Cretaceous tight gas play. The work plan for the quarter of January 1, 1998--March 31, 1998 consisted of three tasks: (1) Acquire necessary data and develop base map of study area; (2) Process data for analysis; and (3) Initiate structural study. The first task and second tasks were completed during this reporting ...
Over the five year period of performance, thirteen task assignments were issued by the DOE to ARINC Research. During the two year base period seven tasks were assigned. Two task assignments were issued for each of the three consecutive one year option periods. Associated with all task assignments were multiple subtasks, some of which required significant effort. These subtasks are appropriately cited in this report under their respective task assignments as principal work activities or deliverables. The technical and management support provided to the DOE under this contract focused on two general areas: (1) appraisal activities and (2) non-appraisal activities. Support to appraisals included planning, document review, developing lines-of-inquiry, interviewing, data collection, report writing, and follow-up. Such work was executed both on-site at the DOE ...
One of the supporting elements of the Advanced Turbine Systems (ATS) Program is the materials/manufacturing technologies task. The objective of this element is to address critical materials issues for both industrial and utility gas turbines. DOE Oak Ridge Operations Office (ORO) will manage this element of the program, and a team from DOE-ORO and Oak Ridge National Laboratory is coordinating the planning for the materials/manufacturing effort. This paper describes that planning activity which is in the early stages.
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy Field Office, Richland (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with federal statutes and regulations. This report summarizes activities of the HCRL during fiscal year (FY) 1990. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks. The task list guided cultural resources management activities during FY 1990 and is the outline for this report. In order, these tasks were to (1) conduct cultural resource reviews, (2) develop an archaeological resources protection plan, (3) monitor the condition of known archaeological sites, (4) ...
The three tasks were completed during this reporting period. During this quarter, work focused on a local structural analysis of the Table Rock field, greater Green River basin (GGRB) in southwestern Wyoming. The ultimate objective of the local analysis is to apply the techniques developed and demonstrated during earlier phases of the project in the Rulison Field area of the Piceance basin for sweet-spot delineation. The primary goal of this work is to focus in on the Table Rock field area in the northern Washakie basin of the Greater Green River basin in support of Union Pacific Resources and DOE planned horizontal drilling efforts. The work plan for the quarter of April 1, 1998--June 30, 1998 consisted of three tasks: (1) Acquire necessary seismic data and depth-convert, (2) Map major fault geometry and analyze displacement vectors, (3) Develop and initiate a natural fracture prediction study.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, ...
The training of a new project team member was completed (Task 2.1). The Software Requirements Document was written (Task 2.3). It was determined that the CAPE-OPEN interfaces are sufficient for the communication between Fluent and V21 Controller (Task 2.4). The AspenPlus-Fluent prototype on allyl/triacetone alcohol production was further developed to assist the GUI and software design tasks. The prototype was also used to analyze the sensitivity of a process simulation result with respect to a parameter in a CFD model embedded in the process simulation. Thus the integration of process simulation and CFD provides additional process insights and enables the engineer to optimize overall process performance (e.g., product purity and yield) with respect to important CFD design and operation parameters (e.g., CSTR shaft speed). A top-level design of the V21 Controller was developed and discussed. A draft ...
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle.
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle. Included is a discussion of fallout forecasting techniques.
Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process.
The recent announcement that the public inquiry into the CEGB's plans to build a PWR at Sizewell will begin in January 1983 and the statement which followed from the task force that was set up in July 1981 to consider the future of the PWR programme in the UK, are considered. The relevant time scales, costs and safety, in particular the cost incurred due to the added safety features for the British PWR, are discussed. The effect of political aspects on the future of the PWR in Britain is considered.
This report details the status of the Biological Conversion of Synthesis Gas Project. The following tasks are described as being completed: (1) the test plan, (2) culture development, and (3) the mass transfer/kinetic studies. The bioreactor studies (Task 4) are underway. The continuous stirred tank reactor system for the conversion of H{sub 2}S to elemental sulfur using Chlorobium thiosulfatophilum has been studied for varying light intensities. The system was also modified to include both sulfur recovery and cell recycle using ceramic membranes. Studies were also performed to observe the effects of cell recycle using a polysulfone hollow filter membrane module. Work on Task 5, limiting conditions/scale-up, includes a scale-up study with three different size reactors to establish the optimum operating conditions for hydrogen production from synthesis gas by the biological water-gas shift reaction using ...
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
The Buried Waste Integrated Demonstration (BWID) is a program of the Department of Energy (DOE) Office of Technology Development whose mission is to evaluate different new and existing technologies and determine how well they address DOE community waste remediation problems. Twenty-three Technical TaskPlans (TTPs) have been identified to support this mission during FY-92; 10 of these have identified some support requirements when demonstrations take place. Section 1 of this report describes the tasks supported by BWID, determines if a technical demonstration is proposed, and if so, identifies the support requirements requested by the TTP Principal Investigators. Section 2 of this report is an evaluation identifying facility characteristics of existing Idaho National Engineering Laboratory (INEL) facilities that may be considered for use in BWID technology demonstration activities.
This document is the report of a task group of the Radiation Therapy Committee of the AAPM and has been prepared primarily to advise hospital physicists involved in external beam treatment of patients with pelvic malignancies who have high atomic number (Z) hip prostheses. The purpose of the report is to make the radiation oncology community aware of the problems arising from the presence of these devices in the radiation beam, to quantify the dose perturbations they cause, and, finally, to provide recommendations for treatment planning and delivery. Some of the data and recommendations are also applicable to patients having implanted high-Z prosthetic devices such as pins, humeral head replacements. The scientific understanding and methodology of clinical dosimetry for these situations is still incomplete. This report is intended to reflect the current state of scientific understanding and technical methodology in clinical dosimetry for ...
The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise ...
This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and ...
In October 1980, Air Products and Chemicals, Inc. began a three year contract with the DOE: Catalyst and Reactor Development for a Liquid Phase Fischer-Tropsch Process. The program contains four major tasks: (1) Project Work Plan, (2) Slurry Catalyst Development, (3) Slurry Reactor Design Studies, and (4) Pilot Facility Design. This report describes work on Tasks 2 and 3 carried out in the third quarter of the contract. In Task 2, the computerized search of the Fischer-Tropsch literature was continued, and improvements were made in data processing programs. Shakedown tests were completed on the first 300 ml slurry reactor, and construction of the second and third reactors began. Five modified conventional slurry catalysts were prepared, and two batches were tested in the gas phase giving information on selectivity as a function of composition and activation. Four supported cluster catalyst were ...
The Tevatron is a proton anti-proton accelerator collider operating at the Fermi National Accelerator Laboratory. The machine is currently delivering beam for the CDF and D0 experiments, which expect increasing luminosity until the conclusion of Run II, planned for 2009. The Laboratory defined a plan for achieving higher luminosity, and one of the tasks is the upgrade of the accelerator's beam position monitor (BPM). The Tevatron was built during the early eighties and some of its control systems, including the BPMs, are still the original ones. This paper describes the front-end software of the Tevatron BPM upgrade, from the requirements to the implementation, and the underlying hardware setup. The front-end software designed is presented, emphasizing its modularity and reusability, allowing it to be applied to other Fermilab machines.
The ALICE experimental area management team faces various challenges when it comes to sharing scarce resources, indispensable to any efficient installation in a category one worksite. Space, cranes, jigs, and personnel with key competences have to be carefully allocated to activities so as to avoid slowing down work progress. To this intent, a resource loaded planning has been developed that allows highlighting coactivities and prioritizing critical tasks. It uses the built-in capabilities of Microsoft Project. The use of this scheduling tool leads to a more efficient use of time and a safer work environment. The installation sequence resulting from this schedule is presented in this paper. The first part of the sequence focuses on the revision of the coils in the SX2 building. The dipole has then to be installed in the RB26 side of the UX25 cavern. This complex and resource intensive activity has to be performed in parallel with the services ...
Task, Psychomotor Vigilance Test (PVT) Transition to Operations ... Related Tasks (36). Task, Psychomotor Vigilance Test (PVT) on ISS. Common Item(s) ...
Since 1976 the Austrian Research Centre Seibersdorf has the task to collect, treat and store radioactive waste (Radwaste) arising in Austria. Within the Department of Waste Management a variety of appropriate treatment systems are installed. For storing unconditioned and conditioned waste proper storage-halls are available. The collection of Radwaste is carried out using 100 l drums, for the conditioned waste the 200 l drum concept is used. The interim storage of conditioned waste is done at Seibersdorf until a final repository is built. The present plan foresees one to be in operation at the year 2012. (author).
The founding of the Hanford Engineering Works to produce plutonium is described. The 45-year defense mission has now been replaced with a peaceful mission, that of being the first site for massive cleanup of the 45-year nuclear waste. In order to establish a remedial investigation and feasibility plan, a process of discovery named the Technical Baseline Report must be performed; the task of this process is to discover all that is known about a proposed cleanup site (what the waste was, where did it go). When none of the documentation can answer the question, oral history is utilized. Some of the problems associated with the conduct of oral history interviews are described, particularly Hanford`s legacy of secrecy.
Conversion of the United States military to the International System of measurement units is in the very early stages. Little formal planning has been done to articulate the management required to complete the conversion of operational Army and Air Force units. For those operational forces tasked to provide continuous combat readiness throughout metrication, management problems associated with the conversion are particularly difficult because of the nature of these assigned missions. This is the case for the 82nd Airborne Division ready brigade force (DRB) and the Military Airlift Command (MAC) strategic airlift system operating the C-141 and C-5A aircraft.
Purpose: The purpose of this course is to review the physical principles underlying design, clinical application and execution of interstitial and intracavitary implants in the classical low dose-rate (LDR) range. This year, the course will focus on quality assurance of sources, applicators and treatment planning software. In addition, development of procedures and QA checks designed optimize treatment delivery accuracy and patient safety during each individual procedure will be reviewed. The level of presentation will be designed to accommodate both physicists and physicians. Implementation of recently published AAPM Task Group reports (no. 40, 'Comprehensive Quality Assurance' and No. 43, 'Dosimetry of Interstitial Brachytherapy Sources') will be reviewed. Outline: (A) General Principles (1) QA endpoints: temporal accuracy, positional accuracy, dose delivery accuracy, and safety of the patient, personnel, and the institution (2) QA procedure ...
All of the project work since the previous report has been on Phase 2B tasks. Therefore, this quarterly progress report summarizes the period's activities in Engineering, Procurement and Civil Construction. Engineering is 95% complete, but revisions and changes are still being incorporated particularly in the Instrument and Electrical areas. Procurement has only valves 4 in. and above yet to order to complete all major items purchased. The scheduled material curve was based on the original estimate of the job. The projected curve reflects the previous month's estimate. Construction of civil work is proceeding according to schedule in the field. The initial bid packages for the Mechanical General Contractor portion of the work have been reviewed and evaluated. Order placement is scheduled for the end of July. The Electrical package is due back from the bidders on July 6. It requires additional evaluation by BSC and DSO and will not be placed until ...
The changes envisaged in the Management's draft plan will focus the resources of the Laboratory on the LHC project and its completion. One of CERN's largest areas of spending is in Industrial Service Contracts, which currently amount to nearly 15% of the CERN budget. At present more than 2000 people have access to CERN through such contracts, although the nature of the contracts means that expenditure is not only on labour but also on materials. The revised cost to completion of the LHC has caused understandable concern that savings in Industrial Services will give rise to job losses at CERN, and rumours of '500 lay-offs' appeared in some newspaper reports. These reports were based on misunderstanding and speculation rather than the actual plan being prepared at CERN. The current proposal regarding expenditure on Industrial Services - which is supported by the findings of Task Force 3 - is to redirect about CHF170 M to the ...
This report presents and discusses results from Task 5 of the study ''Fate of Mercury in Synthetic Gypsum Used for Wallboard Production,'' performed at a full-scale commercial wallboard plant. Synthetic gypsum produced by wet flue gas desulfurization (FGD) systems on coal-fired power plants is commonly used in the manufacture of wallboard. The FGD process is used to control the sulfur dioxide emissions which would result in acid rain if not controlled. This practice has long benefited the environment by recycling the FGD gypsum byproduct, which is becoming available in increasing quantities, decreasing the need to landfill this material, and increasing the sustainable design of the wallboard product. However, new concerns have arisen as recent mercury control strategies developed for power plants involve the capture of mercury in FGD systems. The objective of this study is to determine whether any mercury is released into the ...
This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will ...
The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the requirement of the EC to launch such a network in the area of ...
The US Department of Energy has provided support to four universities and the Oak Ridge National Laboratory in order to pursue research leading to the development and deployment of an advanced robotic system capable of performing tasks that are hazardous to humans, that generate significant occupational radiation exposure, and/or whose execution times can be reduced if performed by an automated system. The goal is to develop a generation of advanced robotic systems capable of performing surveillance, maintenance, and repair tasks in nuclear facilities and other hazardous environments. This goal will be achieved through a team effort among the Universities of Florida, Michigan, Tennessee, Texas, and the Oak Ridge National Laboratory, and their industrial partners, Combustion Engineering, Martin Marietta Baltimore Aerospace, Odetics, Remotec, and Telerobotics International. Each of the universities and ORNL have ongoing activities and ...
The goal of the railplug project is to commercialize this miniaturized railgun as an engine technology as rapidly as possible. To improve the technology transfer process, a board of industrial advisors was established. A list of representatives is included at the end of this annual report. The Railplug External Advisory Board (REAB) met in Austin on March 17--18, 1991 to discuss the project plan. A list of comments from the REAB is included at the end of this progress report, along with our written response to those comments. An alternate ``first`` meeting with some representatives of the REAB was held on July 9, 1991. This meeting was attended by most of the board members who were unable to attend the first meeting. The second meeting of the REAB was held in Toronto, Canada, on October 10, 1991. A list of the board members comments from this meeting is included at the end of this report, along with our written response to those comments. These meetings have proven ...
The goal of the railplug project is to commercialize this miniaturized railgun as an engine technology as rapidly as possible. To improve the technology transfer process, a board of industrial advisors was established. A list of representatives is included at the end of this annual report. The Railplug External Advisory Board (REAB) met in Austin on March 17--18, 1991 to discuss the project plan. A list of comments from the REAB is included at the end of this progress report, along with our written response to those comments. An alternate first'' meeting with some representatives of the REAB was held on July 9, 1991. This meeting was attended by most of the board members who were unable to attend the first meeting. The second meeting of the REAB was held in Toronto, Canada, on October 10, 1991. A list of the board members comments from this meeting is included at the end of this report, along with our written response to those comments. These ...
This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes ...
The strategy for the Korean nuclear power plant lifetime management (PLIM) program, which has been developed over the last 3 years, is introduced, together with descriptions of recent events and related maintenance activities. This leading Korean PLIM project has been focused on such areas as a plant data survey, screening and prioritization of systems, structures and components (SSCs), aging evaluation of major components, economic analysis and regulatory issues. The current status is outlined in terms of major tasks including aging evaluation of 13 major components. The future long-term plan which eventually aims at maximizing the economic benefit for both the utility and its customers is presented. Also described is the technical development required for plant life extension. (orig.).
The goal of the work this quarter has been to partition and high-grade the Greater Green River basin for exploration efforts in the Upper Cretaceous tight gas play and to initiate resource assessment of the basin. The work plan for the quarter of July 1-September 30, 1998 comprised three tasks: (1) Refining the exploration process for deep, naturally fractured gas reservoirs; (2) Partitioning of the basin based on structure and areas of overpressure; (3) Examination of the Kinney and Canyon Creek fields with respect to the Cretaceous tight gas play and initiation of the resource assessment of the Vermilion sub-basin partition (which contains these two fields); and (4) Initiation analysis of the Deep Green River Partition with respect to the Stratos well and assessment of the resource in the partition.
A large portion of the work performed at nuclear power plants follows standardized flow paths. For example, although components on which the maintenance crew works differ from one assignment to the next, all assignments basically follow the same process: requesting, reviewing, planning, scheduling, executing, testing, and documenting the work. In general, the term open-quotes work processclose quotes is used to refer to a standardized sequence of tasks designed within the operational environment of an organization to achieve a specific goal. The predictable nature of work processes suggests that a systematic analysis can be conducted to identify the desirable design of the process and to develop performance measures with respect to the strengths and weaknesses in the process. Furthermore, because of the close relationship of the work process to plant performance and plant safety, it is believed that such an analysis will facilitate the ...
This report summarizes the progress of the Basic Sciences Branch of the National Renewable Energy Laboratory (NREL) from October 1, 1989, through September 30, 1990. Six technical sections of the report cover these main areas of NREL's in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, and Solid-State Spectroscopy. Each section of the report was written by the group leader principally in charge of the work. The task in each case was to explain the purpose and major accomplishments of the work in the context of the US Department of Energy's National Photovoltaic Research Program plans.
This report summarizes the progress of the Basic Sciences Branch of the National Renewable Energy Laboratory (NREL) from October 1, 1989, through September 30, 1990. Six technical sections of the report cover these main areas of NREL`s in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, and Solid-State Spectroscopy. Each section of the report was written by the group leader principally in charge of the work. The task in each case was to explain the purpose and major accomplishments of the work in the context of the US Department of Energy`s National Photovoltaic Research Program plans.
The major goal of this continuation project is to advance the utilization of heat transfer enhancement techniques in commercial heat exchange equipment. Thirteen heat transfer enhancement techniques have been identified as having potential for improving heat transfer coefficients in full-scale industrial equipment. The following tasks are part of this project, which was originally planned for three years: (1) expansion of technology information base; (2) evaluation of performance of enhanced surfaces and inserts; (3) correlation of data for spirally fluted surfaces; (4) study of structured surfaces in pool boiling; and (5) study of structured surface in spray film evaporation.
The manual was prepared for State and local government officials, local emergency planning committee (LEPCs), and other community groups that want to make Title III work. It is intended as a practical guide for those who have little or no previous experience in the field of communication, whose time must be snatched from home and office, and whose resources are limited. The manual has three major sections: Part I discusses planning, which is vital to the success of a communication program; Part II suggests ways to get and keep people involved, especially important because Title III affects so many different sectors of the community; Part III, a how-to-do-it section, talks about specific tasks, such as giving a speech or writing a press release. Appendices include a detailed explanation of the law, a glossary, a list of recent studies related to Title III communications, a list of educational materials, and a list of State ...
Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the project, and outline a market development ...
The objectives of this project are to develop feasible synthetic routes to produce (1) 4(4{prime}-hydroxy-5{prime},6{prime},7{prime},8{prime}-tetrahydro-1{prime}-naphthylmethyl)-6-methyldibenzothiophene, and (2) a 1-hydroxynaphthalene-dibenzothiophene polymer. These compounds are thought to be representative of sulfur containing molecules in coal. The program is divided into three tasks, the first of which is a project work plan that has already been submitted. There are several possible synthetic routes to the target molecule (1). The authors are now investigating two general synthetic approaches: coupling of a dialkylated dibenzothiophene fragment with the phenol, and coupling of a monoalkylated dibenzothiophene fragment with a monoalkylated phenol fragment. This quarter they developed syntheses for the reaction fragments and conducted some preliminary coupling experiments. They found that polymerization of the fragments is a problem; ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) ``Maintenance Management Program`` guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. Fundamental to determining how to apply it is an understanding of the main difference ...
Work on this coke oven gas cleaning demonstration project (CCT-II) this quarter has been focused on Phase IIB tasks, and include engineering, procurement, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. Engineering efforts are nearly complete. Remaining to be finalized is an assessment of electrical heat tracing/insulation needs for pipe lines, assessment of fire protection requirements, and instrument modifications. Procurement of all major equipment items is complete, except for possible additions to fire fighting capabilities. Major focus is on expediting pipe and structural steel to the project site. Civil construction is complete except for minor pads and bases as required for pipe supports, etc. Erection of the hydrogen sulfide and ammonia scrubber vessels is complete. Installation of scrubber vessel internals is underway. A ...
This paper evaluates activities from 1981 to 1985 of the Donetskgormash association which develops and manufactures equipment for coal mining. The association has manufactured 1,410 hoists, 274 blowers and 26 bucket wheel excavators. Sixteen experimental units of new mining equipment have been developed, among others the RPM 3600-42.5/90 bucket wheel excavator (with a capacity of 3,600 m/sup 3//h for coal handling in storage yards of large power plants), the bucket wheel system used in the EhR 630-10.5/0.5 excavator and the PZ 1600-17/20 materials handling system. Among 20 equipment types manufactured from 1981 to 1985, 4 types were manufactured in the USSR for the first time (e.g. the MPP shaft sinking system and the VOD-50 mine blower). Use of new types of equipment manufactured by the association economized about 46 million rubles in coal mines. From 1986 to 1990 production of mining equipment in the association should increase by 133%; about 25.4% of equipment types will be ...
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP ...
... The task consisted of determination of the most economical composition of the charge of the cupola furnace of the foundry. 21s was no simple task. ...
... directed the transformation of designated Service operational headquarters into effective and scalable Joint Task Force headquarters capable of ...
This report presents findings from the first year of a two-year study of interactive efforts involving utilities and non-utility parties (NUPS) working together to prepare plans, develop Demand-Side Management (DSM) programs, or otherwise promote integrated planning and the use of cost-effective DSM measures. Of the ten cases covered in the current study, seven involved the collaborative approach to NUP involvement, which generally is marked by intensive utility-NUP interactions designed to reach consensus on a broad range of important issues; in collaboratives, outside consultants often are provided to enhance the technical capabilities of the NUPS. Another of the cases in this study involved a cooperative arrangement,'' whereby a utility and a NLT worked together in a focused short-term effort to develop a single DSM program. The intense interaction involved in this approach makes it very similar to a collaborative, except ...
This report presents findings from the first year of a two-year study of interactive efforts involving utilities and non-utility parties (NUPS) working together to prepare plans, develop Demand-Side Management (DSM) programs, or otherwise promote integrated planning and the use of cost-effective DSM measures. Of the ten cases covered in the current study, seven involved the collaborative approach to NUP involvement, which generally is marked by intensive utility-NUP interactions designed to reach consensus on a broad range of important issues; in collaboratives, outside consultants often are provided to enhance the technical capabilities of the NUPS. Another of the cases in this study involved a ``cooperative arrangement,`` whereby a utility and a NLT worked together in a focused short-term effort to develop a single DSM program. The intense interaction involved in this approach makes it very similar to a collaborative, except that both the ...
The follow-up system for wastes (JAeSTI), developed at the end of the 1990s, forms a basis for today's followup activities in Finland. JAeSTI relies on an environmental protection database, the compliance monitoring system VAHTI operated by the environmental authorities. Waste followup and waste statistics depend very much on the annual waste quantities recorded in the VAHTI system. In the KYJ-project the coverage and reliability of the data in the VAHTI system was evaluated as for the streams of solid municipal waste. The project also included the compiling of national statistics on municipal waste for the year 2000. The project used other information sources, too, such as statistics compiled when the National Waste Plan and regional waste plans were revised in 2002. In addition, the extent and quantity of in-situ (household) composting and incineration were assessed on the basis of a separate study (Annex 2, In Finnish). In ...
Special Operations Forces (SOF) within a Joint Task Force are controlled by a Joint Special Operations Task Force (JSOTF). Presently, JSOTF headquarters are formed around the core of the Theater Special Operations Command (TSOC), a service SOF headquarter...
This study is a task of ''Comprehensive study'' in ''nuclear energy basic technology research'', which is promoted under cooperation of four research institutes. The Electrotechnical Laboratory conducted, in 1991 in the first period of colaboration, on successful oscillation at visible region (598 nm) as the first case in Japan, construction of small type accumulation ring NIJI-IV for FEL, successful oscillation of visible range from 595 to 488 nm by installing optical krystron with maximum frequency in the world, and successful emittance lowering of accumulation beam by wide improvement of the ring. In the optical resonator, studies on minute loss measuring technique and on recovery from mirror deterioration were promoted. In the second period started from fiscal year of 1994, studies on FEL oscillation technique in short wavelength and upgrading of FEL corresponding to a frontier area were started, to succeed an oscillation experiment at 350 nm in ultraviolet ...
This report is a summary of the contribution of nitrogen and phosphorus in the eutrophication process of inland and coastal waters. Special attention was paid to the mechanisms of these nutrients in regulating biological processes and to the methods available in estimating their effects in the eutrophication of water bodies. The report includes five chapters which are entitled: Introduction, which is a general background to the subject with special attention to the requirements of the Finnish Water Act. Phosphorus and nitrogen as factors regulating biological processes. The topics included are: definition of eutrophication, forms of phosphorus and nitrogen and their sources to inland and coastal waters, effects of these nutrients as growth factors of phytoplankton and macrophytes and consequences of eutrophication. Estimation of the effects of phosphorus and nitrogen. The topics discussed from the point of view of the tasks of the National Board of Waters and the ...
FIU-HCET participated in an ICT meeting at Mound during the second week of December and presented a brief videotape of the testing of the Robotic Climber technology. During this meeting, FIU-HCET proposed the TechXtract technology for possible testing at Mound and agreed to develop a five-page proposal for review by team members. FIU-HCET provided assistance to Bartlett Inc. and General Lasertronics Corporation in developing a proposal for a Program Opportunity Notice (PON). The proposal was submitted by these companies on January 5, 1999. The search for new equipment dismantlement technologies is continuing. The following vendors have responded to requests for demonstration: LUMONICS, Laser Solutions technology; CRYO-BEAM, Cryogenic cutting technology; Waterjet Technology Association, Waterjet Cutting technology; and DIAJET, Waterjet Cutting technology. Based on the tasks done in FY98, FIU-HCET is working closely with Numatec Hanford Corporation (NHC) and Pacific ...
To develop a work in an area with high radiation, it requires of a detailed knowledge of the surroundings work, a communication and effective vision, a near dosimetric control. In a work where the spaces variables and reduced accesses exist, noise that hinders the communication, defendant operative condition, radiation field and taking of decision, it is necessary to have tools that allow a total control of the environment to make opportune and effective decisions, there where the task is developed. Under this elementary concept, it was developed in the Laguna Verde Central a project that it allowed a mechanism, interactive of control in spaces complex; to see, to hear, to speak, to measure. This concept takes to the creation of an equipped system with closed circuit of television, wireless communication systems, tele dosimetry wireless systems, VHS and DVD recording equipment, uninterrupted energy units. The system requires of an electric power socket, and the ...
Cache locking technique is often utilized to guarantee a tighter prediction of Worst-Case Execution Time (WCET) which is one of the most important performance metrics for embedded systems. However, in Multi-Processor Systems-on-Chip (MPSoC) systems with multi-tasks, Level 2 (L2) cache is often shared among different tasks and cores, which leads to extended unpredictability of cache. Task assignment has inherent relevancy for cache behavior, while cache behavior also affects the efficiency of task assignment. Task assignment and cache behavior have dramatic influences on the overall WCET of MPSoC. This paper proposes joint task assignment and cache partitioning techniques to minimize the overall WCET for MPSoC systems. Cache locking is applied to each task to guarantee a precise WCET. We pr...
Autonomous robots or remotely operated vehicles have raised high hopes in the military and industrial communities because of the potential safety improvement and gain of productivity they may provide. Waste management on nuclear sites, pallet manipulation in factories, interventions on battle-fields, etc., are actively studied. A lot of these applications require powerful four-wheel vehicles, the kinematics of which is similar to that of a car. Such vehicles have three degrees of freedom: the (x,y) positions in a plane and the orientation of the vehicle. Path planning is often understood as only changing the position of the vehicle, whereas the tasks performed by this kind of robot requires a perfect orientation of the vehicle: forklifting a pallet or docking at a loading or unloading station requires accuracy in the orientation of the vehicle. It is this requirement and the kinematic constraints of the motion mode which have led to the ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) Maintenance Management Program'' guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. Fundamental to determining how to apply it is an understanding of the ...
Institutional and organizational models ... Review individual centre institutional and organizational models in the light of the tasks to be performed by
The original plan for support of research in geothermal reservoir engineering, GREMP, is reviewed and compared with accomplishments to date. A commentary on the comparison and an updated plan are presented. Also included are a justification of the updated plan and a revised management plan. (MHR)
Two experiments examined the role of compatibility of input and output (I-O) modality mappings in task switching. We define I-O modality compatibility in terms of similarity of stimulus modality and modality of response-related sensory consequences. Experiment 1 included switching between 2 compatible tasks (auditory-vocal vs. visual-manual) and between 2 incompatible tasks (auditory-manual vs. visual-vocal). The resulting switch costs were smaller in compatible tasks compared to incompatible tasks. Experiment 2 manipulated the response-stimulus interval (RSI) to examine the time course of the compatibility effect. The effect on switch costs was confirmed with short RSI, but the effect was diminished with long RSI. Together, the data suggest that task sets are modality specific. Reduced switch costs in compatible tasks may be due to special ...
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.
The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, was re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for coal/IGCC powerplants. The new program was re-titled ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants''. This final report summarizes the work accomplished from March 1, 2003 to March 31, 2004 on the four original tasks, and the work accomplished from April 1, 2004 to July 30, 2005 on the two re-directed tasks. The program Tasks are summarized below: Task 1--IGCC Environmental Impact on high Temperature Materials: The first ...
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
Gel dosimetry is a new dosimetry method applied in radiation therapy. Gel dosimeters consist of a radiation sensitive gel, which can integrate absorbed doses from several radiation sources or beams. The dose to the gel can be evaluated by magnetic resonance imaging (MRI), a procedure that is the focus of the present thesis. A robust tool for the evaluation of the nonuniformity in MRI has been developed, the Deviation Image method. Unlike previously presented methods, the Deviation Image method includes all nonuniformity variations across a phantom surface and is insensitive to stochastic noise. Methods for the estimation of stochastic noise were analyzed in terms of sensitivity to nonuniformities. A method that averages the stochastic noise level over five regions over the phantom surface, and a method that assesses the stochastic noise level from the background, were found to be the methods of choice. Pronounced MR image nonuniformity variation with repetition and T1 relaxation time ...
...2010-10-01 false Information technology security plan and accreditation...Clauses 1252.239-71 Information technology security plan and accreditation...following provision: Information Technology Security Plan and...
Full text: The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This 26-page report summarized previous work on nuclear forensics and gave an initial analysis on prioritizing techniques and methods for forensic analysis regarding source and route attribution. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in ...
The effect of reference signals on performance in a visual vigilance task was studied under three conditions. Reference signals were presented on the same display as the real signals. In condition 1 (control), no reference signals were displayed. Sugbject...
The Space Task Group in its study of future directions in space, with ..... almost $6 billion and a peak civil service and contractor work force of 420000 people. ..... space organizations permitting assumptions of primary or joint responsibility for ...
Performance on serial tasks is influenced by first- and higher-order sequential effects, respectively due to the immediately previous and earlier trials. As response-to-stimulus interval (RSI)...Full Text Available
The purpose of the Joint Task Force Headquarters Master Training Guide (JTF HQ MTG) is to provide a descriptive, performance-oriented training guide to assist leaders in training their units. It also serves as a guide for the JTF Headquarters in actual op...
We used the idea of hierarchical control to study multi-muscle synergies during a whole-body sway task performed by a standing person. Within this view, at the lower level of the hierarchy,...Full Text Available
As requested by the Under Secretary of Defense (Acquisition, Technology, and Logistics) and the Director DARPA, the Defense Science Board task force performed a one-time independent evaluation of the technology investment for the Defense Advanced Research...
This study investigates the doctrinal guidance available to a corps headquarters if required to serve as ajoint task force headquarters and simultaneously be required to warfight the corps. The study contends that a corps being required to simultaneously ...
...undertake missions and tasks (on either a...Secretary of Defense to task the DoD Components...the Chairman of the Joint Chiefs of Staff any commitment of military forces assigned to the Unified... (9) Military forces employed in MSCA...approval from higher headquarters, local military...
A method is proposed for evaluating reliability of planning and calculation of the reliability factor with current planning of open pit mining operations. For a quantitative evaluation of the reliability of fulfilling the planned assignment, laws were defined for distribution of the quality characteristics of the coal. After establishing that coal ash content follows the normal distribution law, the probability was defined that the actual output of coal is greater or equal to the planned. Calculation of the factor of reliability of the current planning of open mining operations makes it possible to determine the optimum planning for this period and the probability of fulfillment of the planned assignments. The technique of planning with regard for reliability makes it possible to select the most reliable variant of the ...
Commercial introduction of new polymer materials for use as the electrolyte in solid tantalum and solid aluminum electrolytic capacitors is underway. ...
... The goal is to understand and describe the work actors do, their information behavior, the context in which they work, and the reasons for their ...
This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.
This report provides a summary of progress for the project {open_quotes}Evaluation of the Geologic Relations and Seismotectonic Stability of the Yucca Mountain Area, Nevada Nuclear Waste Site Investigation (NNWSI).{close_quotes} A similar report was previously provided for the period of 1 October 1991 to 30 September 1992. The report initially covers the activities of the General Task and is followed by sections that describe the progress of the other ongoing tasks.
This second report covers the period August 1 to September 30, 1991. During this period we modified our approach to Task 1 (Hybrid Armature study) with the addition of a numerical simulation of the steady state plasma brush length with a 1-D, four-phase equation of state code. A test fixture was designed and fabrication begun on a plasma brush test fixture for hybrid studies. It will be powered by a 140 kJ, 1 MA capacitor bank on loan to the project. Diagnostic data collection with 20 channels of digitizers and data reduction with a microvax were also arranged. Sliding friction of a solid armature was simulated and found to form a vapor layer at velocities below 2 km/s. The simulations indicated that higher interface pressure results in vapor boundary layer formation at lower velocity. If there is also a minimum interface pressure required to commutate high currents, then an optimum interface pressure will probably result. Plans for a launcher ...
The recently completed ''Deep River Study, Lower Mississippi River'' sponsored by the ''Governor's Task Force on Deep-Draft Vessel Access to the Lower Mississippi River'' contained the following recommended program: Dredge the present 40 foot deep channel to 45 feet initially from the Gulf via Southwest Pass to Mile 172 AHP to provide for two-way navigation of the deep draft vessels that would serve the forecasted most likely level of waterborne commerce (Alternative 9). Plan and seek authorization to further deepen the channel in stages to 55 feet in the future should actual increases in commerce equal the high level level of commerce (Alternative 11). Put into operation, as soon as possible, facilities for loading and topping-off grain ships midstream and topping-off coal carriers in the Gulf in order to attract and establish patterns of trade in large ships. The ...
North Carolina is in the process of siting a LLRW disposal facility as the next host state for the Southwest Compact. After two years of site characterization studies at two technically challenging sites, the LLRW Management Authority (the Authority), will submit a license application for the preferred site. One potential site is in unconsolidated Tertiary and Cretaceous deposits of the inner Coastal Plain, the other in fractured sedimentary rocks of the Triassic Deep River Basin. Involved since 1986, the North Carolina Geological Survey (NCGS) provides technical advice to the Division of radiation Protection, the state regulatory agency authorized to approve or deny a license. With the multi-million dollar project behind schedule, and millions of dollars over budget, in February 1992 the Southeast Compact Commission established three project milestones (1) submit license application by December 31, 1993; (2) approve license by March 15, 1994; (3) open facility by January 1, 1996. This ...
In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to ...
In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to ...
In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to ...
In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to ...
In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to ...
The Geothermal Energy Association ({open_quotes}GEA{close_quotes}) will create and manage a Geothermal Heat Pump ({open_quotes}GHP{close_quotes}) Training Center to deliver GHP and HVAC courses throughout California in response to imminent demand driven by national promotion. GEA services include providing management structure, cadre, curricula, promotion and physical equipment. The Center is dedicated to infrastructure strengthening goals of the Geothermal Heat Pump Consortium, Inc. ({open_quotes}GHPC{close_quotes}), the California Energy Commission ({open_quotes}CEC{close_quotes}) and Interagency Geothermal Heat Pump Task Force, and Geothermal Energy Association ({open_quotes}GEA{close_quotes}). Second-half 1996 start-up is co-funded by GHPC, CEC, GEA and three California utilities. Initial support is to five utilities representing 70 percent of California power users. Goals include becoming market driven by year No. 3 and self-finding by year No. 5. AR training ...
This document - IAEA Safeguards: Implementation Blueprint of Commercial Satellite Imagery - constitutes the second report from SSC Satellitbild giving a structured view and solid guidelines on how to proceed with a conceivable implementation of satellite imagery to support Safeguards activities of the Agency. This Phase 2 report presents a large number of concrete recommendations regarding suggested management issues, work organisation, imagery purchasing and team building. The study has also resulted in several lists of actions and preliminary project plans with GANT schedules concerning training, hardware and software, as well as for the initial pilot studies. In both the Phase 1 and Phase 2 studies it is confirmed that the proposed concept of a relatively small Imagery Unit using high-resolution data will be a sound and feasible undertaking. Such a unit capable of performing advanced image processing as a tool for various safeguard tasks ...
In this work an analysis of the influence of the choice of the algorithm or planning system, on the calculus of the same treatment plan is introduced. For this purpose specific software has been developed for comparing plans of a series of IMRT cases of prostate and head and neck cancer calculated using the convolution, superposition and fast superposition algorithms implemented in the XiO 4.40 planning system (CMS). It has also been used for the comparison of the same treatment plan for lung pathology calculated in XiO with the mentioned algorithms, and calculated in the Plan 4.1 planning system (Brainlab) using its pencil beam algorithm. Differences in dose among the treatment plans have been quantified using a set of metrics. The recommendation for the dosimetrist of a careful choice of the algorithm has been ...
This paper focuses on the development of explicit self-awareness in children. Mirror self-recognition has been the most popular paradigm used to assess this ability in children. Nevertheless, according to Rochat (2003), there are, at least, three different levels of explicit self-awareness. We therefore designed three different self-recognition tasks, each corresponding to one of these levels (a mirror self-recognition task, a picture self-recognition task and a masked self-recognition task). We observed a decrease in performance across the three tasks. This supports a developmental scale in self-awareness. Besides, the masked self-recognition performance makes it possible to assess the final and the most sophisticated level of self-awareness, i.e. the external self. To our best knowledge,...
This report accounts for Task 3 of DOE Contract No. AC01-81FE-05077. It reviews the developments in indirect coal liquefaction with emphasis on slurry-phase reactors and catalysis. This report also discusses topics related to indirect coal liquefaction research, such as analytical techniques in catalysis. The subjects covered in this report were selected by DOE. This report is the third and final task report of the three major tasks in this contract. The first task, ''Direct Coal Liquefaction Catalyst Development - Program Review and Research Perspectives'', was completed in November 1982. The second task, ''Review of Direct Coal Liquefaction by Slurry-Phase Catalysis'', was completed in September 1983. 47 refs., 66 figs., 50 tabs.
This is the third quarterly progress report for Year 3 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between Jan. 1, 2002 and Mar. 31, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility (Task 3: Addition of a Cuttings Injection/Separation System), (b) Research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (c) Research project (Task 9b): ''Study of Foam Flow Behavior Under EPET Conditions'', (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and ...
Research performed under this contract was divided into four tasks under the following headings: Task 1, Characterization of fly ash; Task 2, Measurements of the optical constants of slags; Task 3, Calculations of the radiant properties of fly ash dispersions; and Task 4, Measurements of the radiant properties of fly ash dispersions. Tasks 1 and 4 constituted the Ph.D. research topic of Sarbajit Ghosal, while Tasks 2 and 3 constituted the Ph.D. research topic of Jon Ebert. Together their doctoral dissertations give a complete account of the work performed. This final report, issued in two volumes consists of an executive summary of the whole program followed by the dissertation of Ghosal and Ebert. Volume 2 contains the dissertation of Ebert which covers the measurements of the optical constants of slags, and calculations of the radiant ...
Key elements in strategic planning in the nonferrous mining industry are discussed. Included are price forecasting, financial planning, government relations, research and development, and exploration. Financial planning is discussed in terms of 1) forecasting of earnings, 2) investment policy and 3) tax planning. Costs of environmental liabilities are expected to have a major impact on the industry. (JMT)
The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.).
This report forms part of an independent review of the specifications, execution and results of Task 6 of the Aespoe Task Force on Modelling of Groundwater Flow and Transport of Solutes, which is seeking to provide a bridge between site characterization (SC) and performance assessment (PA) approaches to solute transport in fractured rock. The present report is concerned solely with Task 6C, which relates to the construction and parametrisation of a block-scale hydrostructural model of the TRUE Block Scale region of the Aespoe Hard Rock laboratory. The task objectives, specifications and outcome are summarised and reviewed. Also, consideration is given to how the hydrostructural model might affect the outcomes of Task 6D and 6E. The main conclusions of this review are summarised below: The Task 6C hydrostructural model is a more comprehensive approach to ...
This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required.
...false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE...925 Additional requirements for health plans. (a) General rules....
The Task Force solicited comments on its Draft Final Report from a variety of sources. Letters were sent to over 400 individuals who had expressed interest in the interest in the Department`s radioactive waste, management programs, a notice was placed in the Federal Register, the morning session of the January 1993 meeting of the full Secretary of Energy Advisory Board was given over to discussion of the draft, and Task Force members and staff presented the effort at several professional meetings. Altogether 32 written comments were received. They are reproduced here, followed in each case by the Task Force`s response to specific suggestions made to improve the draft. (The panel did not respond to comments that simply reflected policy preferences or that praised the group`s effort.) With one exception, those specific suggestions are highlighted and given a letter designation from {open_quotes}A{close_quotes} to ...
The goal of GRI's Gas Appliance Technology Center is to encourage the introduction of highly efficient, cost-effective, convenient gas appliances for residential and commercial gas users. The report covers activity at Battelle from February 1989 to April 1990 in broad support tasks, residential and commercial appliances, and residential space conditioning. Broad support tasks included the G/A/S Newsletter; the GATC InfoBase; and technology transfer, workshops, and GATC coordination. Residential appliance tasks included burner technology research, gas appliance venting, gas lighting, and plastics durability. Commercial appliance tasks included development of a commercial cooktop fuel/air mixing valve. Residential space conditioning tasks included a corrosion test method for gas appliances and vents, generic technology for condensing heat exchangers, and technology for ...
This report describes the 5 tasks to be covered under this project and compiles budget information. Task 1 is to establish a Plutonium Information Resource, which has been established in Amarillo, Texas. Task 2, Advisory Functions, coordinates studies and activities relating to the disposition of excess weapons-grade plutonium. Task 3, Environmental, Public Health, and Safety, supports soil remediation activities. Task 4, Education and Outreach, is supporting four programs: K--12 education improvement in science and math courses; Academic intervention to identify and encourage high ability high school and middle school students with potential to become scientists and engineers; Graduate education evaluation; and Public outreach programs. Task 5, Plutonium and other Materials Studies, is currently funding two projects for the disposition of high explosives: a ...
This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.
Unmanned systems are often used to augment the ability of humans to perform challenging tasks. While the value of individual unmanned vehicles have been proven for a variety of tasks, it is less understood how multiple unmanned systems should be used together to accomplish larger missions such as site security. The purpose of this paper is to discuss efforts by researchers at the Idaho National Laboratory (INL) to explore the utility and practicality of operating multiple unmanned systems for a site security mission. This paper reviews the technology developed for a multi-agent mission and summarizes the lessons-learned from a technology demonstration.
Volume VII of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the tritium transport model documentation. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
Volume VI of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the groundwater flow model data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
Volume IV of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the hydrologic parameter data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
Volume II of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the potentiometric data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
In FY 1984 three specific tasks which are all related to not-well-understood two-phase phenomena of importance to LWR accidents have been identified under the program. These three tasks are: (1) inverted annular flow experiments and modeling; (2) hot leg U-bend two-phase flow simulation study; and (3) development and evaluation of two-phase flow scaling criteria. Some of the important results obtained under Tasks (1) and (2) are reported in this paper.
This chapter reports recent advances in the statistical learning literature that may be of interest for biometrics. In particular we discuss two different algorithmic settings, binary classification and multi-task learning, and analyze the two closely related problems of feature selection and feature learning. In the binary case the theoretical and algorithmic advances to feature selection are applied to solve face detection and face authentication problems. In the multi-task case we show how the data structure described by a group of features common to the various tasks can be effectively learned, and then we discuss how this approach could be used to address face recognition.
Abstract The authors provide a survey of how images are used in radiation therapy to improve the precision of radiation therapy plans, and delivery of radiation treatment. In contrast...Full Text Available
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different ...
Federal regulators were set to vote on a plan to protect deep water corals and other sensitive fish habitats that will likely include a permanent ban on ...
A brief article considers the possible result of the enquiry into Nirex`s plan to build an underground rock laboratory at Sellafield in relation to radioactive waste disposal in the UK. (UK).
In the National Water Plan it is described which measures must be taken to keep the Netherlands safe and livable for future generations and to make use of the chances offered by water.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
This data layer consists of polygons representing harvest area boundaries from Timber Harvest Plans approved by the California Department of Forestry ... ...
2.1 The Importance of Life Cycle Management and Cost Estimating................. ........... 1-2 .... 4.3.5 Task 12: Update Cost Estimate on Regular Basis. ...
Information superiority provides the Joint force a competitive ... Information Grid (GIG) as it matures and fills the needs of the Joint Task Force ... representatives from The Army Secretariat, Headquarters Department of Army ...
How to decide which mine surface tasks may be performed by industrial robots to improve productivity and working conditions is described. Charts are presented of the industrial tasks performed on the surface and how each task may be classified as light, average, difficult or very diffcult according to a defect criteria is explained (defective operations are those which involve, heavy, harmful, stressful or dangerous jobs). The results of these calculations are used to identify which operations are suitable for first introduction of robots since traditional automation methods cannot be used, e.g. various storage, loading and packaging tasks, coal selection, sorting and removal of foreign matter, provision of services such as food preparation, cleaning, etc. Robots may also be used to control automated operations that are monotonous and hazardous for human operators. It is envisaged that in the future ...
... Headquarters Element, Defense Logistics Agency, Support Detachment 3 ... Joint Task Force, Team 6 ... 19th Special Forces Group, Support Element 1 ...
... 7th Joint Task Force Augmentation Team Schwetzingen ... Headquarters 85th Division Training Support, Detach 2 ... 20th Special Forces Company A ...
BackgroundFeature selection is an important pre-processing task in the analysis of complex data. Selecting an appropriate subset of features can improve classification or clustering...Full Text Available
Selection of the appropriate radiation quality is an important aspect of optimisation for every clinical imaging task in radiology, since it affects both image quality and patient dose. Spreadsheet...Full Text Available
... The other standards in this group deal with heat exchangers, insulation, marking, valves, hydraulic cleanliness, storage of LPG, and centrifugal fire ...
... WHS- Washington Headquarters Service. ... US Military (ie, Army, Navy, Air Force) service publications ... Strike Group to Fight in the Joint Task Force. ...
The Morris water maze is widely used to evaluate to evaluate the spatial learning ability of rodents under laboratory settings. The present study demonstrates that reproductive male meadow voles, Microtus pennsylvanicus, are able to acquire and retain a spatial water maze task using celestial cues. Voles were able to acquire a modified outdoor Morris water maze task over 4 trials per day, whereby they had to learn and remember the location of a submerged hidden platform, using the position of the sun and associated celestial cues. Their proficiency on this task was related to the availability of the celestial cues, with voles displaying significantly poorer spatial navigation on overcast than clear days and when the testing time (and position of the sun and associated celestial cues) was shifted from morning to afternoon. These findings with meadow voles support the ecological relevance of the water maze ...
... WHS- Washington Headquarters Service. ... ie, Army, Navy, Air Force) service publications ... The Case of the Rapid Deployment Joint Task Force. ...
... WHS- Washington Headquarters Service ... but also with respect to other Joint, National and ... unit of action (UA) combat team or task force is organized ...
Introduction. This study used Item-Response Theory (IRT) to model the psychometric properties of a false belief picture sequencing task. Consistent with the mental time travel hypothesis of paranoia, we anticipated that performance on this deductive theory of mind (ToM) task would not be associated with the presence of persecutory delusions but would be related to other clinical, cognitive, and demographic factors. Method. A large (N=237) and diverse clinical and nonclinical sample differing in levels of depression and paranoid ideation performed 2 ToM tasks: the false belief sequencing task and a ToM stories task that was used to assess the validity of the false belief sequencing task as a measure of ToM. Results. A unidimensional IRT model was found to fit the data well. Latent ToM ability as measured by the false belief sequencing task ...
Amotivation is a telling hallmark of negative symptomatology in schizophrenia, and it impacts nearly every facet of behavior, including inclination to attempt the difficult cognitive tasks involved...Full Text Available
... for team sizes ranging from 2 to 6 robots. ... intercep- tion mission, a robot must overtake a ... of unmanned underwater vehicles (UUV), unmanned aerial ...
... Experts ( Appendix 5 ), and the NMFS-Sea Grant Joint Graduate Fellowship Program ( Appendix 6) . The Task Force consisted of one representative from NMFS Headquarters and 1-2 rep...
We used neuropsychological tasks to investigate integrity of brain circuits linking orbitofrontal cortex and amygdala (orbitofrontal-amygdala), and dorsolateral prefrontal cortex and hippocampus...Full Text Available
Sep 5, 1996 ... In Haiti, the military deployed a space support team to advise the task force commander on the effective use of space assets, such as the Milstar ...
This standard establishes requirements, verification criteria, and contractor tasks for electromagnetic effects protection of airborne, ground, and support systems. These effects include electromagnetic compatibility, electromagnetic interference, lightni...
Jan 14, 2004 ... presented to the nation at NASA Headquarters, Washington, D.C., ...... Board/Air Force Scientific Advisory Board Joint Task Force on ...
DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current ...
By using the paired comparison methodology, it was possible to establish evaluative priorities, providing criterion weights which reflected the thoughts and feelings of an advisory committee consisting of experts in the task selection process. For the U.S. Army Infantry School, the weights can be used to stress higher weighted criterion results in the task selection process. By extending the size and diversity of the advisory committee, the use of paired comparison methodology can provide an effective, reliable procedure for (1) constructing evaluative criterion weights for the task selection process and in other areas which have multiple criteria used for evaluative purposes and (2) incorporating into an evaluative design the valuable contributions of various experts and interest groups. (Author/BW)
Even before Egyptian times, fiber and paper-based methods were used to manage time, tasks, and priorities. Papyrus and paper were effective in their time, but now is the time for the even more effective computer-based methods of time management. This study compares paper and computer methods of the management of time, tasks, and priorities. Discussed are recommended strengths of off-the-shelf software for time management. Integrated software is recommended. A case study of the use of idea processing software to manage publication tasks and priorities is examined. Illustrated--for classroom-style training--are uses of a computer to enhance the quality and increase the efficiency of the coordination of publications from conception and research to printing and issuance. 3 refs., 43 figs.
... increasing its economic results, tapping mew financial sources and augmenting its income, but also a basic task in financial and tax management. ...
Recall from visual memory is vulnerable to the influence of task-irrelevant information, including the remembered, prototypical value of stimuli seen previously. Wilken...Full Text Available
Flow cytometry (FCM) is widely used in health research and in treatment for a variety of tasks, such as in the diagnosis and monitoring of leukemia and lymphoma patients, providing the counts of helper-T...Full Text Available
joint task force (JTF), division (OIV) and regimental combat team (RCT) with ..... Headquarters, Department of the Army. (HQOA), (2010). Field Manual 2-0 ...
The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix?s LPG fuel processor system integrated into Plug Power?s residential-scale GenSys 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program?s primary goal is ...
This interim technical report presented a summary of results obtained from Pit Lake models developed from different simulation models. The models were used to predict stratification in a hypothetical Pit Lake. Predictions were used to assess the hydrodynamic similarities and differences between the 2 models and to determine if the models would produce similar stratification profiles for the Pit Lakes to previous models. Results showed that the models produced similar results for both temperatures and salinities. The main difference between the RMA10 and CE-QUAL-W2 model used in a previous study was found to be run time. A sensitivity analysis of the RMA10 and CE-QUAL-W2 model predictions was completed to assess the effects of segmentation; time step; lake surface area; lake orientation; and model coefficients or parameters. Results showed that the selected time step and model segmentation were appropriate, as both led to modelling results that were stable. However, while the CE-QUAL-W2 ...
The primary goal of this project is to increase the availability and ease of access to critical data on the Mesaverde and Dakota tight gas reservoirs of the San Juan Basin. Secondary goals include tuning well log interpretations through integration of core, water chemistry and production analysis data to help identify bypassed pay zones; increased knowledge of permeability ratios and how they affect well drainage and thus infill drilling plans; improved time-depth correlations through regional mapping of sonic logs; and improved understanding of the variability of formation waters within the basin through spatial analysis of water chemistry data. The project will collect, integrate, and analyze a variety of petrophysical and well data concerning the Mesaverde and Dakota reservoirs of the San Juan Basin, with particular emphasis on data available in the areas defined as tight gas areas for purpose of FERC. A relational, geo-referenced database (a geographic ...
Implementation of a plan to charge waste management costs to the facility that generates such waste requires a long-term commitment and consistent administration. The benefit is that generators are provided the incentive to optimize waste management practices if the charges are appropriately applied. This paper summarizes (1) a plan to charge waste generators, (2) the administrative structure of the plan, (3) a comparison between the rate structure and changes in waste disposal operations, and (4) issues that have surfaced as the plan is implemented. 2 refs., 1 fig., 1 tab.
This report summarizes the objectives, background, technical progress, and status of ANL electric vehicle battery R&D tasks for DOE-EHP during the period of January 1 through March 31, 1991. The work is organized into the following six task areas: Project management; battery systems technology; lithium/sulfide batteries; advanced sodium/metal chloride battery; aqueous batteries; and EV Battery performance/life evaluation.
This report summarizes the objectives, background, technical progress, and status of ANL electric vehicle battery R D tasks for DOE-EHP during the period of January 1 through March 31, 1991. The work is organized into the following six task areas: Project management; battery systems technology; lithium/sulfide batteries; advanced sodium/metal chloride battery; aqueous batteries; and EV Battery performance/life evaluation.
This report covers the technical effort through February, 1989. This effort was directed towards the technology associated with the development of a large scale, long pulse DF-CO{sub 2} chemical laser. Optics damage studies performed under Task 1 assessed damage thresholds for diamond-turned salt windows. Task 2 is a multi-faceted task involving the use of PHOCL-50 for laser gain measurements, LTI experiments, and detector testing by LANL personnel. To support these latter tests, PHOCL-50 was upgraded with Boeing funding to incorporate a full aperture outcoupler that increased its energy output by over a factor of 3, to a full kilojoule. The PHOCL-50 carbon block calorimeter was also recalibrated and compared with the LANL Scientech meter. Cloud clearing studies under Task 3 initially concentrated on delivering a Boeing built Cloud Simulation Facility to LANL, and currently involves design of a Cold ...
Advances in robotic technologies reflected in commercially available and demonstrated capabilities provide exceptional alternatives to the designer of new and upgraded production processes. This paper discusses the states of the art of these technologies, describes some of the research and application engineering which has extended and exploited these capabilities, and provides some conceptual synthesis of advanced robotics and other industrial automation to hypothetical nuclear industry/laboratory tasks. Nuclear industry applications are oriented upon tasks in hazardous and contaminating environments and with hazardous materials.
Mission, threat and capabilities adaptations in the twenty-first century continue to change the tasks assigned to U.S. Army Infantry units. Traditional infantry tactical training does not prepare U.S. infantry forces for many of the tasks required in cont...
Previous work shows the presence of scale invariance and long-range correlations in ongoing and spontaneous activity of large scale brain responses (i.e. EEG), and such scaling behavior can also be modulated by simple sensory stimulus. However, little is known whether such alteration but not destruction in scaling properties also occurs during complex cognitive processing and if neuroplasticity plays any role in mediating such changes. In this study, we addressed these issues by investigating scaling properties of multivariate EEG signals obtained from two broad groups - artists and non-artists - while they performed complex tasks of perception and mental imagery of visual art objects. We found that brain regions showing increased correlation properties from rest were similar for both tasks, suggesting that brain networks responsible for visual perception are reactivated for mental imagery. Further, we observed that the two groups could be ...
Universal Oil Products, Inc. (UOP) of Des Plaines, Illinois has contracted A.E. Roberts & Associates, Inc. (AERA) of Atlanta, Georgia to prepare a sensitivity analysis for the development of the Fluidized-bed Copper Oxide (FBCO) process. As proposed by AERA in September 1991, development of the FBCO process design for a 500 mega-watt (MW) unit was divided into three tasks: (1) Establishment of a Conceptual Design, (2) Conceptual Design, (3) Cost Analysis Task 1 determined the basis for a conceptual design for the 500 megawatt (MW) FBCO process. It was completed by AERA in September of 1992, and a report was submitted at that time {open_quotes}Establishment of the Design Basis for Application to a 500 MW Coal-fired Facility.{close_quotes} Task 2 gathered all pertinent data available to date and reviewed its applicability to the 500 MW FBCO process. Work on this task was carried out on a joint basis ...
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: ...
This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.
The Devonian oil shales of the Eastern United States are a significant domestic energy resource. The overall objective of the multi-year program, initiated in October 1987 by the US Department of Energy is to perform the research necessary to develop the Pressurized Fluidized-Bed Hydroretorting (PFH) process for producing oil from Eastern oil shales. The program also incorporates research on technologies in areas such as raw shale preparation, beneficiation, product separation, and waste disposal that have the potential of improving the economics and/or environmental acceptability of recovering oil from oil shales using the PFH process. The results of the original 3-year program, which was concluded in May 1991, have been summarized in a four-volume final report published by IGT. DOE subsequently approved a 1-year extension to the program to further develop the PFH process specifically for application to beneficiated shale as feedstock. Studies have shown that beneficiated shale is the ...
The Devonian oil shales of the Eastern United States are a significant domestic energy resource. The overall objective of the multi-year program, initiated in October 1987 by the US Department of Energy is to perform the research necessary to develop the Pressurized Fluidized-Bed Hydroretorting (PFH) process for producing oil from Eastern oil shales. The program also incorporates research on technologies in areas such as raw shale preparation, beneficiation, product separation, and waste disposal that have the potential of improving the economics and/or environmental acceptability of recovering oil from oil shales using the PFH process. The results of the original 3-year program, which was concluded in May 1991, have been summarized in a four-volume final report published by IGT. DOE subsequently approved a 1-year extension to the program to further develop the PFH process specifically for application to beneficiated shale as feedstock. Studies have shown that beneficiated shale is the ...
The set of activities performed by SENTECH, Inc. addressed the specific recommendations provided to the Department of Energy (DOE) by its advisors, including the Hydrogen Technical Advisory Panel and the review panel members of the DOE Annual Hydrogen Program Review. SENTECH`s efforts were conducted under five tasks: Task 1: Technology and Process Analysis; Task 2: Hydrogen Information Development and Transfer; Task 3: Educational Products; Task 4: Systems Analysis; and Task 5: Life Cycle Costs. SENTECH activities were executed in two broad areas--analysis and technology transfer. The analytical tasks undertaken in FY97 were focused on two types of analysis--systems analysis and technical/economic assessments. These analytical activities benefit DOE by providing data that allow it to define the strategic goals of the hydrogen R and D ...
Conventional radiography has been the accepted nondestructive testing (NDT) method used for many years to either ''accent'' or ''reject'' a field weld in the pipeline industry. However, conventional radiography requires the expense of film, developing chemicals, and manpower for film development. It also normally has a delay of 2 hours or more between when the weld was radiographed and when the radiographic film of the weld is available for interpretation. Over the last few years, a newer approach to performing radiographic testing, called ''realtime'' radiography, has been used in several different types of field inspection operations. The realtime radiography system forms the image with optical imaging in lieu of photographic film. Objectives of this project were: (Task 1) Integration of realtime x-ray system components into a realtime-radiographic imaging ...
There are five tasks within this project on thermally stable coal-based jet fuels. Progress on each of the tasks is described. Task 1, Investigation of the quantitative degradation chemistry of fuels, has 5 subtasks which are described: Literature review on thermal stability of jet fuels; Pyrolytic and catalytic reactions of potential endothermic fuels: cis- and trans-decalin; Use of site specific {sup 13}C-labeling to examine the thermal stressing of 1-phenylhexane: A case study for the determination of reaction kinetics in complex fuel mixtures versus model compound studies; Estimation of critical temperatures of jet fuels; and Surface effects on deposit formation in a flow reactor system. Under Task 2, Investigation of incipient deposition, the subtask reported is Uncertainty analysis on growth and deposition of particles during heating of coal-derived aviation gas turbine fuels; under ...
The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste.
Volume V of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the transport parameter and source term data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
Volume III of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the data covering groundwater recharge and discharge. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.
There is evidence that aged normal subjects have more difficulty in achieving automaticity than young subjects. The underlying central neural mechanism for this phenomenon is unclear. In the present study, functional magnetic resonance imaging (fMRI) was used to investigate the effect of normal ageing on automaticity. Aged healthy subjects were asked to practice self-initiated, self-paced, memorized sequential finger movements with different complexity until they could perform the tasks automatically. Automaticity was evaluated by having subjects perform a secondary task simultaneously with the sequential movements. Although it took more time, most aged subjects eventually performed the tasks automatically at the same level as the young subjects. Functional MRI results showed that, for bot...
A three-light, three-lever discrete avoidance behavioral task was initiated to study the effects of a 500-675 rad neutron pulse upon performance. Eight primates performed the task for 4 h(3.5 h postexposure) on exposure day and for 4 h on each of 3 d postexposure. For the exposure day, five subjects had a decrease in correct responses, seven had increased reaction times, and six experienced productive emesis within 3.5 hours postexposure. Although the performance degradations were not severe, these data suggest that the performance of time critical tasks could be significantly impaired.
Many real-world text classification tasks involve imbalanced training examples. The strategies proposed to address the imbalanced classification (e.g., resampling, instance weighting), however, have not been systematically evaluated in the text domain. In this paper, we conduct a comparative study on the effectiveness of these strategies in the context of imbalanced text classification using Support Vector Machines (SVM) classifier. SVM is the interest in this study for its good classification accuracy reported in many text classification tasks. We propose a taxonomy to organize all proposed strategies following the training and the test phases in text classification tasks. Based on the taxonomy, we survey the methods proposed to address the imbalanced classification. Among them, 10 common...
In 1992, the Society of Automotive Engineers (SAE) established a task force to develop a procedure for measuring electric energy consumption, all-electric range, fuel economy, and exhaust emissions for hybrid vehicles; the procedure will be submitted to regulatory agencies as representing the automotive industry`s recommendations. The draft procedure is currently being tested on hybrid vehicles. The University of Maryland`s parallel hybrid was tested in September 1994, and the University of California-Davis` parallel hybrid and the University of Illinois` series hybrid will be tested in November 1994 and January 1995, respectively. The procedure is being modified to incorporate any lessons learned, and the task force hopes to recommend the final procedure to the SAE by mid 1995.
Adolescents with emotional and behavioral disorders (EBD) often fail to master literacy skills, in part because disruptive behaviors interfere with task engagement and persistence. The theory of behavioral momentum explains the persistence of behavior in the face of changing environmental conditions. The current exploratory study examined variables related to behavioral momentum in the context of a continuous reading task. Participants were three adolescents identified with EBD who were instructional on fifth-grade material. Results indicated that when participants read a third-grade paragraph immediately before a fifth-grade paragraph, they decreased the latency to initiate reading of the fifth-grade paragraph and increased words read correctly per minute on the first 10 words of the fifth-grade paragraph. Results are discussed in terms of the theory of behavioral momentum and the nature of interventions that may be developed to increase ...
Due to recent advancements in mobile computing and communication technologies, mobile ad hoc computational Grids are emerging as a new computing paradigm, enabling innovative applications through sharing of computing resources among mobile devices without any pre-existing network infrastructure. Energy-efficient resource allocation is one of the key issues in mobile ad hoc computational Grids due to limited battery life of mobile nodes. To reduce energy consumption, we propose a hybrid power-based resource allocation scheme for allocation of interdependent tasks to nodes within mobile ad hoc computational Grid. The basic idea is to exploit dependencies and task type, and allocate interdependent tasks to nodes accessible at minimum transmission power. We also propose a power-based algorithm...
Leading abstract. The goals of the Norwegian Academy of Technological Sciences (NTVA) are to promote research, education and development within technological and related sciences, for the benefit of the Norwegian society and for the development of Norwegian industry. Future energy policy and Global climate change are major issues in the Norwegian discussion today. The answers given have great influence on our industry and involve huge technological challenges. In the current situation NTVA wishes to contribute to the development of new technology. In 1998 the Norwegian Academy of Technological Sciences organized the seminar ''Do We Understand Global Climate Change''. NTVA have now followed this up with a seminar on the Energy System, one of the major sources of manmade greenhouse gases. The world's demand for energy increases with improvements in our standards of living. The cleaning of emissions from production processes requires more ...
A large number of proven technical solutions exists for the use of renewable energies (RE). However, their dissemination is still too slow to meet the political goal of substituting 12 % of the primary energy demand in the European Union by the year 2010. Even renewable energy systems (RES) with economic potential are only partly exploited. There is a long literature concerning the barriers to RE use. In particular it has become clear that the availability of finance and the forms and conditions upon which it is lent have a major impact on RE deployment. An area of importance is the deficiency of appropriate ownership forms and properly adapted financing instruments in certain countries. Moreover, different regulations and institutional barriers in the European countries hinder the free flow of capital for RES within the European common market. On the other hand, solutions have been developed very successfully in individual countries. Differences in cultures and institutions have ...
This paper describes the deliverables framework developed by Vanderbilt University Medical Center (VUMC) in its IAIMS planning process. The key deliverables include: visions for the future; mission,...Full Text Available
This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.
Four-dimensional (4D) radiotherapy is the explicit inclusion of the temporal changes in anatomy during the imaging, planning, and delivery of radiotherapy. One key component of 4D radiotherapy planning...Full Text Available
This plan describes the Quality Assurance Program which will be applied to spent fuel handling and packaging tests conducted at the Area 25 E-MAD facility, Nevada Test Site (NTS).
This report gives an overview of KIDS (Kestrel Interactive Development System). We describe a program derived with KIDS to solve the Missionaries and Cannibals problem (MC PROBLEM), a classical AI planning problem. Our interest in this problem arose as th...
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning mi...
ObjectivesTo describe the plans of English NHS hospitals to implement ePrescribing systems.Design and settingQuestionnaire-based survey of attendees...Full Text Available
Adaptive radiation therapy (ART) is the incorporation of daily images in the radiotherapy treatment process so that the treatment plan can be evaluated and modified to maximize the amount of radiation...Full Text Available
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
Given the high prevalence of overweight and low levels of physical activity among children, a better understanding of physical activity behaviour is an important step in intervention planning. This...Full Text Available
Megavoltage photon intensity-modulated radiation therapy (IMRT) is typically used in the treatment of prostate cancer at our institution. Approximately 1% to 2% of patients with prostate cancer have hip prostheses. The presence of the prosthesis usually complicates the planning process because of dose perturbation around the prosthesis, radiation attenuation through the prosthesis, and the introduction of computed tomography artifacts in the planning volume. In addition, hip prostheses are typically made of materials of high atomic number, which add uncertainty to the dosimetry of the prostate and critical organs in the planning volume. When the prosthesis is bilateral, treatment planning is further complicated because only a limited number of beam angles can be used to avoid the prostheses. In this case study, we will report the observed advantages of using noncoplanar beams in the delivery of IMRT to ...
The purpose of this work is to develop a novel feature-based registration strategy to automatically map the rectal contours from planning computed tomography (CT) (pCT) to cone beam CT (CBCT). The rectal...Full Text Available
The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3.
BackgroundObesity has reached epidemic proportions in the United States. It is implicated in the development of a variety of chronic disease states and is associated with increased...Full Text Available
Purpose:To investigate the clinical usage of dose verification of Helical Tomotherapy plans by using 2D-array ion chambers, and to develop an efficient way to validate the dose delivered...Full Text Available
BackgroundThe purpose of our investigation was to compare a digital templating system to conventional templating techniques when preoperatively planning for total hip arthroplasty.MethodsWe...Full Text Available
The aim of this study is to develop an Automatic Post-processing Tool for four-dimensional (4D) treatment planning (APT4D) that enables the user to perform some necessary procedures related...Full Text Available
Program plans of the Office of Coal Technology in coal liquefaction are presented. Technology description, status, market applications, program strategy and program management descriptions are included. 2 figs. (CBS)
The Plan identifies the Army's organization, goals, objectives, and policies with respect to energy. It projects energy consumption and costs to the year 2000 and summarizes the programs required to support the long range goals. A summary of current and needed energy related legislation is included. (Author)
In June 2010, Basic Energy Plan was approved in a Cabinet meeting. It says that Japan aims to construct more than 14 atomic power plants by 2030. Today, there are 12 plans of construction of atomic power plant, but it is hard to say that their plans easily come off. That's because public acceptance of atomic power plant is low in Japan, for example local residents wage opposition campaigns. This study conducts a survey in the form of a questionnaire and analyzes it by Analytical Hierarchical Process (AHP). Analytic Hierarchy Process is a structured technique for dealing with complex decisions. A questionnaire using AHP is very easy to answer and analyze. This survey was conducted in 2 areas. First area is Hohoku-cho, Yamaguchi Pref. that had a plan of construction of atomic power plant and the plan was demolished by opposition campaigns. Second area is Kaminoseki-cho, Yamaguchi ...
...2010-10-01 false Special rules relating to group health plans. 146.145 Section 146.145 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS REQUIREMENTS FOR THE GROUP HEALTH...
42 Public Health 3 2010-10-01 2010-10-01 false Health benefits plan: Supplemental health services. 417.102 Section 417.102 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF...
We investigated high-resolution mental imagery and mental rotation, while the participants received caloric vestibular stimulation. High-resolution visual mental imagery tasks have been shown...Full Text Available
... Headquarters 5th Brugade 78th Division (Ts) ... 2nd Battalion 20th Special Forces Company B ... 29th Corps Personnel Serves Hq Joint Task Force Aug ...
... NE Mall Room B-607, EPA Headquarters, 401 M ... formally adopted and initiated a joint strategy for ... CLI kick-off Partner and Task Force meeting. ...
Reliable dietary assessment is a challenging yet essential task for determining general health. Existing efforts are manual, require considerable effort, and are prone to underestimation and misrepresentation...Full Text Available
BackgroundThe variety of ways in which faces are categorized makes face recognition challenging for both synthetic and biological vision systems. Here we focus on two face processing...Full Text Available
ObjectiveMusician's focal dystonia is usually considered to be task specific but secondary motor disturbances have been reported also. We carried out a detailed evaluation of the...Full Text Available
The status of the South American Geocentric reference System (SIRGAS) Project is presented, including the project goals, objectives and tasks already carried out by the Working Groups. (author). 2 refs., 1 fig., 1 tab
Individuals with major depressive disorder (MDD) often exhibit impaired executive function, particularly in experimental tasks that involve response conflict and require adaptive behavioral...Full Text Available
The Executive Director for Operations (EDO) in establishing the Piping Review Committee concurred in its overall scope that included an evaluation of the potential for pipe breaks. The Pipe Break Task Group has responded to this directive. This report summarizes a review of regulatory documents and contains the Task Group's recommendations for application of the leak-before-break (LBB) approach to the NRC licensing process. The LBB approach means the application of fracture mechanics technology to demonstrate that high energy fluid piping is very unlikely to experience double-ended ruptures or their equivalent as longitudinal or diagonal splits. The Task Group's reommendations and discussion are founded on current and ongoing NRC staff actions as presented in Section 3.0 of this report. Additional more detailed comments and discussion are presented in Section 5.0 and in Appendices A and B. The obvious ...
Treatment of functional bowel disorders of irritable bowel-type (IBS) in children remains a difficult task because of a lack of drugs with low adverse event profile. We here report the results of a...Full Text Available
This report results from a contract tasking Eindhoven University of Technology as follows: The contractor will investigate the plasma treatment of surfaces and plasma enhanced deposition using EUT's cascade arc source as the basis for this effort.
Rare Earth Cobalt (REC) permanent magnets have unique properties that permit solutions to some optical tasks that cannot be accomplished with conventional magnets. A review of design and of performance characteristics of these magnets includes an analytical description of the three dimensional fringe fields of REC quadrupoles.
ObjectiveThis study discusses an appropriate framework to measure system performance for the task of neonatal seizure detection using EEG. The framework is used to present an extended...Full Text Available
Preventing tobacco use in youths may be an easier task than helping adults break the habit of smoking and overcome its ill effects. Using experimental procedures based on social work techniques,...Full Text Available
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development ...
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development ...
Background:An association has been reported between the dominant nostril through which we breathe and the cerebral hemisphere found to be active.Aims:To...Full Text Available
... We also toured a Trident submarine at Kings Bay, Ga. "During the weekend at the Joint Interagency Task Force Headquarters in Key West, Fla., we ...
This manual provides information to assist in selection and designing control measures for reducing pollutant discharges from combined sewer overflows (CSOs). he manual will be useful for municipal public works staff, design engineers, and regulatory agency staff tasked with the ...
BackgroundThe various tasks of visual systems, including course control, collision avoidance and the detection of small objects, require at the neuronal level the dendritic integration...Full Text Available
This paper summarizes the findings for the African Region of the WPA Task Force on Steps, Obstacles and Mistakes to Avoid in the Implementation of Community Mental Health Care. We present an overview...Full Text Available
Circuit modification associated with learning and memory involves multiple events, including the addition and remotion of newborn cells trough adulthood. Adult neurogenesis and gliogenesis were mainly...Full Text Available
Laser-assisted processing techniques for producing high-quality solar cell metallization patterns are being investigated, developed, and characterized. The tasks comprising these investigations are outlined.
We studied multi-joint coordination during tasks of transporting real and imaginary objects with two arms. One of the arms was unexpectedly arrested in one third of trials performed. In the...Full Text Available
Patients with schizophrenia can be taught the Wisconsin Card Sorting Test (WCST) sorting rules based upon expanded feedback. However, few task manipulations have been reported that differentially...Full Text Available
This monograph explores an alternative way of providing a JSOTF headquarters to the Joint Force Commander. Beginning with a history of joint SOF doctrine, the monograph outlines the evolution of special operations command and control and the subsequent ne...
Responsibility for the operation and maintenance of the bulk of the 132 kV cable network in England and Wales was transferred from the CEGB to the area boards in the 1970s. Norweb has successfully dealt with the increase in work using in-house expertise exclusively.
Microarray data has a high dimension of variables but available datasets usually have only a small number of samples, thereby making the study of such datasets interesting and challenging. In the task...Full Text Available
Peripheral vision has been the topic of few studies compared with central vision. Nevertheless, given that visual information covers all the visual field and that relevant information can...Full Text Available
Officers receive service-specific education and undergo experiences within their components that provide the expert knowledge that enables them to operate in their respective military departments. Given the Department of Defense (DoD) emphasis on service ...
The main objectives of Phase 2 are to determine the feasibility of using cements with controlled particle size distributions (CPSD cements) in practical concrete applications, and to refine our estimates of the potential energy savings that may ensue from such use. The work in Phase 2 is divided into two main tasks, some parts of which will be carried out simultaneously: Task 1 will continue cement paste studies to optimize cement performance similar to those of Phase 1, but with particular emphasis on gypsum requirements, blended cements, and water-reducing admixtures. This task will also include preparation of sufficient CPSD cements for use in all Phase 2 work. Task 2 will be a comprehensive examination of the properties of concretes made with CPSD cements. This will include optimization of concrete mix designs to obtain the best possible performance for practical applications of both portland and ...
Static task intensity–endurance time (ET) relationships (e.g. Rohmert's curve) were first reported decades ago. However, a comprehensive meta-analysis to compare experimentally-observed...Full Text Available
Double cones (DCs) are the most common cone types in fish, reptiles and birds. It has been suggested that DCs are used for achromatic tasks such as luminance, motion and polarization vision. Here we...Full Text Available
A summary of research conducted during the first year is presented. The research objectives were sought by conducting two tasks: (1) investigation of probabilistic design techniques for reliability-based design of composite sandwich panels, and (2) examin...
ObjectivesTo study inhalation and dermal exposure to hexamethylene diisocyanate (HDI) and its oligomers as well as personal protection equipment (PPE) use during task performance...Full Text Available
This official IEA report is a deliverable of IEA SHC Task 21/IEA BCS Annex 29: Daylight in Buildings. The Task focuses on daylighting systems and strategies which can be applied in new and existing buildings with a high potential electricity saving potential such as offices, schools, commercial, and institutional buildings. The daylighting performance of these strategies and systems is tested in laboratory facilities, through modeling, and in real case study buildings. This paper provides methods and procedures to evaluate the daylighting performance of real buildings. Annex 29 case studies located in Europe, North America, and Australia. It is a deliverable of Subtask D research projects. The main objective of Subtask D, as stated in the Implementing Agreement of Task 21/Annex 29, is `to demonstrate the viability of daylighting buildings in various world climatic zones as a means of achieving significant improvements in ...
One of the tasks comprising ERDA Contract EY-76-S-02-2840, ''Minimization of Cupola Energy and Air Pollution,'' has been the carrying out of a comprehensive survey of world literature relating to the cupola furnace for melting of cast iron. It was decided...
The author compares the UHF Follow-on and MILSTAR satellite communication systems. The comparison uses an analytical hierarchy process. Although the two systems have been tasked with different missions, a comparison of cost, capability, and orbit is condu...
New neurons are generated in the granule cell layer of the dentate gyrus (GCL) throughout adulthood. This process is modulated by many environmental and neurochemical factors. We previously...Full Text Available
The last of our series on the Task Forces. PS accelerator 'We had a clear mandate, which we could approach in a logical way', explains Steve Myers, Head of SL Division and convenor of Task Force 5, 'To avoid duplication of effort in the accelerator sector through a restructuring that would lead to greater efficiency and flexibility and so release resources for the LHC.' The implementation of all their recommendations is already underway, albeit with different time scales. In 2001 the accelerator sector involved more than 900 staff members in three divisions (LHC, PS and SL) and one unit (AC), working in 141 sections within 34 groups. The first step for the Task Force was to identify major activities within the sector and to set up inter-divisional working groups to review these activities (16 in all), identifying the technologies and the numbers of staff associated with each activity. The working groups were also asked ...
Safety standards for exposure to radiofrequency radiation must be based upon biologic consequences of exposure to such environments. Behavioral-based measures are considered to be the most-sensitive indices of biological effects. Current safety guidelines are based upon average power density and may not be relevant to the high-peak-power, short pulse width microwave radiation produced by newly developed high peak power microwave sources. The effects of exposure to high-peak-power radiation on reflexive responding and motor function in Fischer 344/N rats were assessed by measuring startle and general activity, and disruption of on-going performance of a rotarod task, respectively. The emitter used was the TEMPO repeat pulse axially extracted vircator. Exposure to single pulses resulted in significant startle responses. Exposure to 1 pps for 10 s produced significant alterations in baseline activity and marked disruption of performance of the rotarod ...
The tendency for some individuals to partake in high-risk behaviors (eg, substance abuse, gambling, risky sexual activities) is a matter of great public health concern, yet the characteristics and neural...Full Text Available
Average human behavior in cue combination tasks is well predicted by Bayesian inference models. As this capability is acquired over developmental timescales, the question arises, how it is learned....Full Text Available
Conceptual documents like Joint Vision 2010 (JV 2010), the Concept for Future Joint Operations (CFJO), and the Revolution in Military Affairs (RMA) postulate that advances in technology and information superiority will revolutionize the way military force...
The non-licensed operator on the job training model presently considered for development and implementation at C.N. Almaraz (CNA) has the primary objective of imparting practical knowledge and skills to the trainee on a per system basis and specific to the job position. This model is somewhat different in scope from the OJT process used in U.S. stations because the learning process is not done on a task per task basis, but rather on the concept of learning collectively all the knowledge and skills required by the specific-system job. This model arose primarily from two thoughts. First, the knowledge and skills have been obtained from a detailed job and task analysis process which will result in the learning of many required knowledge and skills divided by three categories: components, systems and academics. Secondly, the OJT most commonly used in the U.S. requires that the respective station department administers and ...
for sensitive personnel data. Based on the judgment of Task Force ...... Gunn, R ., Memorandum on Sub-Atomic Power Sources for Submarine ... Hunley, J., ed., The Birth of NASA: The Diary of T. Keith Glennan, SP-4105, ...
...COMCAM forces document Air Force and air component activities...supported unified command or joint task force commander, through the...Force COMCAM forces in a joint environment. If an...share of Unified Command headquarters COMCAM and visual...
(General Stafford) was selected as chair for the Task Force based on his expertise .... a large foreign customer base that includes joint working agreements with Russia, the .... NASA Headquarters management advocates the Jorge Scientific ...
Abstract: HARVEST was designed as a strategic research and planning tool, allowing assessment of the spatial pattern consequences of broad timber management ...
... due to the evolving nature of the Strategy Maps and the changing priority roles, it was decided not to link the SMSP directly with any Strategic Plans. ...
The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.
The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily.
This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual.
... CJCSI 3141.01C, Responsibilities for the Management and ... of a multivolume set of CJCS unclassified and ... (1) CJCSM 3122.01A, Joint Operation ...
The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.
This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
Four major projects at UNRSL have been supported by NWPO-Neotectonics Yucca Mountain Task 4 funds during the last year: (1) Operation and analysis of data from the UNRSL microearthquake network at Yucca Mountain. (2) Continued operation, maintenance, and calibration of three broadband stations. Limited data analysis was also initiated. (3) Continued review by Dr. Brune of documents and literature related to seismic hazard and tectonics of the Yucca Mountain region. (4) Testing of noise levels in boreholes.
This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.
What makes teamwork tick?. Cooperation matters, in daily life and in complex applications. After all, many tasks need more than a single agent to be effectively performed. Therefore, teamwork rules!. Teams are social groups of agents dedicated to the fulfilment of particular persistent tasks. In modern multiagent environments, heterogeneous teams often consist of autonomous software agents, various types of robots and human beings. Teamwork in Multi-agent Systems: A Formal Approach explains teamwork rules in terms of agents' attitudes and their complex interplay. It provides the first comprehe
The Knowledge Associates for Novel Intelligence (KANI) system provides a collection of automated 'associates' to actively support and participate in the information analysis task. In this paper, we describe the Information Integration Associate (IIA), which facilitates analyst interaction with underlying KANI reasoning and extraction associates and provides an interactive representation of the analytic process. We focus on features of the IIA that guide communication between the user and the KANI system in a way that ensures mutual understanding of the analytic task being performed, the capabilities of the system to assist the user, and the status of any reasoning and extraction conducted on behalf of the user by the KANI system.
The Fast Flux Test Facility near Richland, Washington, utilizes computer control for reactor refueling and other related core component handling and processing tasks. The computer controlled tasks described in this paper include core component transfers within the reactor vessel, core component transfers into and out of the reactor vessel, remote duct measurements of irradiated core components, remote duct cutting, and finally, transferring irradiated components out of the reactor containment building for off-site shipments or to long term storage. 3 refs., 16 figs.
This Radioactive and Mixed Waste Management Plan for the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory is written to meet the requirements for an annual report of radioactive and mixed waste management activities outlined in DOE Order 5820.2A. Radioactive and mixed waste management activities during FY 1994 listed here include principal regulatory and environmental issues and the degree to which planned activities were accomplished.
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning missions. Careful logistical and operational planning can optimize the health, performance, and readiness of the working dog while protecting the safety and well-being of the team members working with them. We also offer recommendations for medical treatment of dog bites. PMID:19813342
The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site.
The reports in this series are designed primarily to familiarize professional land use and resource planners with the range of possibilities and effective procedures for achieving integrated mining, reclamation, and land use planning. These reports are ba...
IAEA Plans of activities include, General Conference in September 2001 which reviewed activities relevant to preventing nuclear terrorism and proposed master plan. The Board of Governors approved new Nuclear Security Plan for the next four years. Three activity areas are; - needs assessment, analysis and coordination, prevention and detection and response.
The Hungarian Power Companies Ltd. has been using the IAEA planning methodologies since 1985 when it acquired the WASP model. Since then this model has been applied on a regular basis to determine the least cost expansion plan of the power generating system of the country. This report describes this experience as well as the application of the WASP model for other types of studies. (author).
The Conference on Building Design and Architecture organized by Swedish Council for Building Research Contents included articles on building physics, thermal-climate technology, and building location and planning.
An experimental plan for improving the problems of failed fuel location system in Wolsung Unit-2 reactors was established. It is not possible to make an experiment on the failed fuel monitoring nuclides in the cold laboratories because they have very short half life. Therefore, the experiments can be only carried out at the existing monitoring system under reactor operation. For that reason, an experimental plan was drawn up for installing the radiation detection system on reactor site.
Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.
Topics of this proceedings are: DNA damage and repair; Space research; Cell and tissue radiobiology; Treatment planning 1: The role of clinical RBEs; Treatment planning 2: Dose optimization and inverse planning; Dosimetry; Clinical results of particle therapy and new techniques; Status reports and future developments. Separate abstracts were prepared for 79 chapters. (orig./SR)
The Phase I feasibility study has focused on determining the availability of information for estimating exposures of the public to chemicals and radionuclides released as a result of historical operation of the facilities at the Oak Ridge Reservation (ORR). The estimation of such past exposures is frequently called dose reconstruction. The initial project tasks, Tasks 1 and 2 were designed to identify and collect information that documents the history of activities at the ORR that resulted in the release of contamination and to characterize the availability of data that could be used to estimate the magnitude of the contaminant releases or public exposures. A history of operations that are likely to have generated off-site releases has been documented as a result of Task 1 activities. The activities required to perform this task involved the extensive review of historical operation records and ...
The University of Maryland at Baltimore was awarded a grant from the Department of Energy to test a specially modified incinerator to burn biomedical radioactive waste. In preparation for the incinerator, the Radiation Safety Office devised a comprehensive plan for its safe and effective use. The incinerator plan includes a discussion of regulations regarding on-site incineration of radioactive waste, plans for optimum use in burning four principal waste forms, controlled air incineration technology, and standard health physics safety practices; a use plan, including waste categorization and segregation, processing, and ash disposition; safety procedures, including personnel and area monitoring; and methods to evaluate the incinerator's effectiveness by estimating its volume reduction factors, mass and activity balances, and by determining the cost effectiveness of incineration versus ...
This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.
Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the ...
Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems ...
A consortium of four institutions, based at Western Michigan University, was to plan a Research and Development Center on Student Testing, Evaluation, and Standards Setting. The four consortium sites are Boston College, the Dallas Independent School District, the University of Kansas, and Western Michigan University. This report is a final performance report for the planning grant made to Western Michigan University by the National Institute of Education. The first section provides a summary of the planning activities actually conducted under the grant. It includes a description of particular problems and successes, a list of participants and their affiliations, and an evaluation report for the planning project. The second section is a technical report on the Research and Development (R and D) mission for the Center. It updates the mission and strategy statement contained in the ...
This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As ...
Purpose: Various published reports involving intensity-modulated radiotherapy (IMRT) plans developed using automated optimization (inverse planning) have demonstrated highly conformal plans. These reported conformal IMRT plans involve significant target dose inhomogeneity, including both overdosage and underdosage within the target volume. In this study, we demonstrate the development of optimized beamlet IMRT plans that satisfy rigorous dose homogeneity requirements for all target volumes (e.g., #+-#5%), while also sparing the parotids and other normal structures. Methods and Materials: The treatment plans of 15 patients with oropharyngeal cancer who were previously treated with forward-planned multisegmental IMRT were planned again using an automated optimization system developed in-house. The optimization system ...
P.S. Lowell and Co., Inc. (Lowell and Co.) and Jay S. Dweck, Consultant, Inc. (JSD) under contract to the US Department of Energy (DOE) Morgantown Energy Technology Center (METC) have developed and implemented an aqueous electrolyte calculation capability into the ASPEN (Advanced System for Process Engineering) process simulator. This report documents the efforts of Task 1 which were to implement the basic calculational capability. Task 2 involves development of several unit operations models and demonstration of the models in simulating environmental control processes in coal gasification and shale oil processing plants. Task 1 of the project involved several subtasks: selection of a chemical equilibrium algorithm; selection of activity coefficient algorithms; selection of species for inclusion in the initial implementation; collection of required data for the selected species; regression of parameters not found in the ...
France has committed herself to keep in 2010 the same levels of greenhouse gas emissions as those of 1990, i.e. 144 millions of tons of carbon equivalent (MtCe). However, taking into account the existing pollution abatement measures and the measurements performed so far, the greenhouse gases level should reach 160 MtCe in 2010. Therefore, the inter-ministry commission on greenhouse effect decided on November 27, 1998 to elaborate a new national plan of fight against greenhouse effect. The elaboration of the new plan has fallen under the responsibility of the inter-ministry mission of greenhouse effect (MIES). The new plan was presented by the prime minister, L. Jospin, on January 19, 2000. This document summarises the content of the new plan: architecture (modalities of elaboration, content), measures for the reduction of greenhouse gas emissions (industry, transportation sector, buildings, ...
Summary'THE ROLE OF THE UK PLANNING SYSTEM IN PROTECTING AND ENHANCING SOILS PROJECT REF: UKLQ01 APRIL 2004 INTRODUCTION Soil has long been overlooked in environmental planning. Whilst it has sometimes benefited from indirect protection, until recently its importance and vulnerability have not been reflected in more explicit strategies. This study explored the current and potential role of the planning system in protecting and enhancing soils. Soil is the physical material that covers much o [continued...]DescriptionSNIFFER has commissioned this study on behalf of SEPA, SNH, EHS and the Environment Agency for England and Wales. These UK agencies have an interest in protecting soil quality through a combination of direct regulation of emissions to land, protection of designated sites of special value or sensitivity and engaging other regulatory regimes such as land use planning. All UK environment ...
The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication ...
A plan to diffuse instructional modules for the preparation of transportation professionals is presented, based on research and demonstration projects sponsored by the Urban Mass Transportation Administration (UMTA). The diffusion/adoption plan involves: developing instructional modules; disseminating the modules to professors teaching transportation courses at the college level; promoting the use and adoption of the modules; and evaluating and revising the plan. Transportation educators teach in a variety of disciplines (e.g., engineering, public administration, urban planning, and technology). Eight design and evaluation criteria for the instructional modules are listed, along with the procedures used by West Virginia University in developing the five instructional modules. The diffusion strategy involves repackaging UMTA research findings, change agents, and the use of information channels (e.g, ...
This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance ...
The Electrochemical Program at Argonne National Laboratory (ANL) provides technical and programmatic support to DOE`s Electric and Hybrid Propulsion Division (DOE-EHP). The goal of DOE-EHP is to advance promising electric-vehicle (EV) propulsion technologies to levels where industry will continue their commercial development and thereby. significantly reduce petroleum consumption in the transportation sector of the economy. In support of this goal, ANL provides research, development, testing/evaluation, post-test analysis, modeling, database management, and technical management of industrial R&D contracts on advanced battery and fuel cell technologies for DOE-EHP. This report summarizes the battery-related activities undertaken during the period of October 1, 1991 through March 31, 1992. In this report, the objective, background, technical progress, and status are described for each task. These tasks are structured into the following ...
The Electrochemical Program at Argonne National Laboratory (ANL) provides technical and programmatic support to DOE's Electric and Hybrid Propulsion Division (DOE-EHP). The goal of DOE-EHP is to advance promising electric-vehicle (EV) propulsion technologies to levels where industry will continue their commercial development and thereby. significantly reduce petroleum consumption in the transportation sector of the economy. In support of this goal, ANL provides research, development, testing/evaluation, post-test analysis, modeling, database management, and technical management of industrial R D contracts on advanced battery and fuel cell technologies for DOE-EHP. This report summarizes the battery-related activities undertaken during the period of October 1, 1991 through March 31, 1992. In this report, the objective, background, technical progress, and status are described for each task. These tasks are structured into the following ...
The Safeguards and Security Technology Development Directory is published annually by the Office of Safeguards and Security (OSS) of the US Department of Energy (DOE), and is Intended to inform recipients of the full scope of the OSS R&D program. It is distributed for use by DOE headquarters personnel, DOE program offices, DOE field offices, DOE operating contractors, national laboratories, other federal agencies, and foreign governments. Chapters 1 through 7 of the Directory provide general information regarding the Technology Development Program, including the mission, program description, organizational roles and responsibilities, technology development lifecycle, requirements analysis, program formulation, the task selection process, technology development infrastructure, technology transfer activities, and current research and development tasks. These chapters are followed by a series of appendices which contain more specific ...
Implementation of Noble Metal Chemical Application (NMCA) in a Boiling Water Reactor (BWR) requires injection of a noble metal compound while the reactor is idle at hot shutdown conditions. In order to minimize outage time, utilities are very pro-actively finding ways to reduce the number of critical path tasks. One of these tasks is to remove some containment vessel drywell head bolts during the NMCA idle time. This, thereby, saves the utilities outage time, or they can perform other tasks as desired. Using design basis conditions and state-of-the-art analytical techniques, detailed finite element stress analyses of the closure region are performed. Two acceptance criteria are evaluated. The first is that contained within Section III of the ASME Code for allowable stresses. The second relates to leak tightness, i.e., with bolt removal the joint must still remain leak tight. This paper describes the activities performed to ...
An overview of the Canadian mining industry`s state of preparedness for the Year 2000 is presented. Committees within the mining industry are working on scheduling and implementing activities, defining criticality, monitoring remedial action, and contingency planning. The Mining Association of Canada is working with the Federal Government`s National Contingency Planning Group to deal with potential threats to health and security. Survey results suggest that mining poses a low to medium risk based on the state of planning for Y2K. The results of a survey of member preparedness is tabulated. 1 tab.
This symposium about electric operational and expansion planning presents several articles that approaches issues such as, monitoring the power system stability, electrical load modelling, reliability in power systems, optimization in power systems, integrated resources planning in power systems, reactive control through static compensators, power flow analysis, system modelling, etc
Sirio is a computerized application to manage the hydroelectric system in a short time. This management is implemented as a real time tool in the Control Department. SIRIO has many modules, independent and integrated to operate and perform the data acquisition, optimization, planning simulation and planning optimization. This article presents the SIRIO System and its applications to the Iberdrola system in Tajo river.
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.
The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
The brochure contains information about the Emergency Planning and Community Right-to-Know Act. This law establishes a structure at the state and local levels to assist communities in planning for chemical emergencies and requires facilities to provide information on various chemicals present in the community. The Act requires that this information be made available to the public. One of the requirements concerns the reporting of annual releases of toxic chemicals to the air, water, and land. These provisions are outlined in Section 313 which mandates annual release reporting for over 300 chemicals.
Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)
We have studied the application of direct aperture optimization (DAO) as an inverse planning tool for breast IMRT. Additionally, we have analysed the impact of respiratory motion on the quality of the delivered dose distribution. From this analysis, we have developed guidelines for balancing the desire for a high-quality optimized plan with the need to create a plan that will not degrade significantly in the presence of respiratory motion. For a DAO optimized breast IMRT plan, the tangential fields incorporate a flash field to cover the range of respiratory motion. The inverse planning algorithm then optimizes the shapes and weights of additional segments that are delivered in combination with the open fields. IMRT plans were generated using DAO with the relative weights of the open segments varied from 0% to 95%. To assess the impact of breathing motion, the ...
This document presents a detailed schedule for the implementation of the strategy for managing defense remote-handled (RH) transuranic (TRU) waste. The baseline management strategy was defined in the Defense Remote-Handled Transuranic Waste Cost/Schedule Optimization Study and is summarized in this document. Also included are revised RH TRU waste inventory projections, current site management plans, a list of key decision points and milestones, and a discussion of uncertainties associated with management of RH TRU waste. The plans are summarized in a detailed schedule diagram and in an RH TRU waste work off diagram. 9 refs., 5 figs., 4 tabs.
'As part of the Computer Protection Plan, this Network Security Plan identifies the specific security measures used to protect Bechtel Hanford, Inc.'s (BHI's) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington, and facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the remainder of the Hanford community.'
... The revised work plan emphasized the research priorities of preharvest rodent damage to rice, the importance of postharvest food losses to rodents ...
Sick leave and other types of nonvested leave are expensed as taken. ... Employees Retirement System (FERS), a defined benefit and contribution plan. ...
The article presents briefly the plans of the British Petroleum Oil Company for a new hydrogen power plant that includes an offshore platform in the North Sea.
The book tries about the International and national aspects, natural gas situation, production, consumption, prices, demand projection, energetic plans, norms and laws of the natural gas in Colombia
15 to 75% of the gun barrel diameter. Similarly, model masses typically vary from 0.01 to 100 .... taining acceptable levels of gun barrel erosion. The ...
Canada will provide telescope baffles and fine error sensor assemblies. ..... ( Ongoing) Flight tests aboard sounding rockets and balloon planned for FY 1995. .... the effects of incoming energetic particles and solar radiation on the ...
Apr 22, 2010 ... I believe that space exploration is not a ... plan for space exploration, especially in .... space exploration beyond low Earth orbit. ...
... kinematic model for the robots and designed ... theoretic approach for modeling mobile robot teamn formations". ... "UUV teams, control from a biological ...
Japan Atomic Energy Research Institute (JAERI) is developing the world`s strongest spallation neutron source using high power proton accelerator and promoting a neutron science project for comprehensive studies on basic science and nuclear transmutation of high-level radioactive nuclide from nuclear power stations. For this purpose, JAERI organized the Special Taskforce for Neutron Science and OMEGA Project in April 1996 and reorganized it to Center for Neutron Science in April 1997. During this period, various research plans using the spallation neutron source are proposed and facilities necessary for research are studied by mainly research groups of JAERI. This report describes research plans and results of the preliminary conceptual design study on proposed facilities plan. (author)
Rationale and ObjectivesSample-size estimation is an important consideration when planning a receiver operating characteristic (ROC) study. The aim of this work was...Full Text Available
This paper discusses organizational models of planning technology development in coal mining. The following 4 planning systems are analyzed: all-union national system coordinated by the Ministry of Coal Mining of the USSR, all-union associations of coal mine associations (in the Ukrainian SSR the plan is developed by the Ministry of Coal Industry of the Republic), associations of coal mines, coal mines or groups of coal mines. Methods for developing programs for technology development at 4 levels are reviewed. The following planning periods are used: 10 years or more (from 1980 to 1990), a 5 year period and a 1 year period. System for technology development in the Soviet coal industry from 1981 to 1985 is evaluated: research and development programs (20 comprehensive state programs, 36 branch programs). (In Russian)
Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.
Map layer displays land designated as Suitable Land For Timber Production for the Forest Plan. It consists of all National Forest Lands less Non-forested ... ...
... less humans have to do to operate a robot. ... Robots can help human operators with the increase ... important mission outlined by the UUV master plan. ...
o If retaining CSRS/FERS, transferred employee will be credited with accumulated sick leave o Be reimbursed for travel, transportation, relocation costs ...
... System (CSRS) and the Federal Employees Retirement System (FERS). ... retirement, thrift savings plan, annual and sick leave, severance pay and ...
Jun 6, 2011 ... Sick leave is earned at a rate of 4 hours per pay period. ... The Federal Employees Retirement System (FERS) is a three-tiered pension plan ...
Purpose: The aim of this study was to assess interinstitutional variations in planning for stereotactic body radiation therapy (SBRT) for lung cancer before the start of the Japan Clinical Oncology Group (JCOG) 0403 trial.Methods and Materials: Eleven institutions created virtual plans for four cases of solitary lung cancer. The created plans should satisfy the target definitions and the dose constraints for the JCOG 0403 protocol.Results: FOCUS/XiO (CMS) was used in six institutions, Eclipse (Varian) in 3, Cadplan (Varian) in one, and Pinnacle3 (Philips/ADAC) in one. Dose calculation algorithms of Clarkson with effective path length correction and superposition were used in FOCUS/XiO; pencil beam convolution with Batho power law correction was used in Eclipse and Cadplan; and collapsed co...
Program Plans, Implementation, & Results Energy Management at Federal Facilities Energy Management at DOE Fleet Management Interagency Coordination Interagency Energy...
Nov 15, 2006 ... Sick leave and other types of non-vested leave ... For FERS employees, NASA makes contributions of 10.7 percent to the defined benefit plan, ...
The management of risks of explosives are described. Administrative and procedural controls are considered. The safety management plan involves hazard identification, risk analysis, assessment and control. The current position of explosives safety is considered. 4 tabs.
Two complementary computer programs have been developed for forecasting the demands and evaluating the costs of proposed radiographic facilities. The models are employed here in analyses of the sensitivity...Full Text Available
This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of ...
This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories/New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of ...
Disclosed in this proposal are plans to construct a patent pending wrist module with computer control, configurable to form high-dexerity telerobotic arms ...
... Deepwater Program is a 25-year, $24 billion plan to replace or modernize its fleet of vessels, aircraft, and information management capabilities. ...
He said, I had heard of Cloud Computing when I was in grad school, but they had presentations on it at EclipseCon. I was sold that it was something that ...
The bacterium Serratia marcescens produces a plethora of multicellular shapes of different colorations on solid substrates, allowing immediate visual detection of varieties. Such a...Full Text Available
Science plays paradoxical roles in environmental planning. As a process for generating and adapting knowledge of the biophysical environment to human use, it is essential to achieving sustainability. As the socially contested evaluation of competing claims to truth, however, adversarial science often becomes the focus of conflict in the planning process. British Columbia's Central Coast Land and Resource Management Plan (CCLRMP) planning process took place amid industrial restructuring, market campaigns, and scientific disputes over the conservation of the world's largest remaining temperate rainforest. This article shows how adversarial science set the terms of the policy debate, as well as the means for compromise. A multisector interdisciplinary information team played a key role in arr...
... the program manager plans to spend $23.2 million to procure 107 Hornets in excess of the 270 required by the 82nd Airborne Division for its basic ...
In recent years conservation of electric power has become an integral part of utility planning. The 1980 Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) requires that the region consider conservation potential in planning acquisitions of resources to meet load growth. The Bonneville Power Administration (BPA) developed its first estimates of conservation potential in 1982. Since that time BPA has updated its conservation supply analyses as a part of its Resource Program and other planning efforts. Major updates were published in 1985 and in January 1990. This 1992 document presents updated supply curves, which are estimates of the savings potential over time (cumulative savings) at different cost levels of energy conservation measures (ECMs). ECMs are devices, pieces of equipment, or actions that increase the efficiency of electricity use and reduce the amount of ...
The objective of this Task Group is the coordination of research studies on biokinetic models and the evaluation of the implications of new biokinetic models on dose assessment and safety standards. For this the new ICRP models, which will be used for a revision of ICRP Publications 30, 54, 68 and 78, are implemented into six different computer codes in five European countries and quality assured by intercomparison procedures. The work has started with the implementation of the new ICRP Alimentary Tract Model. New systemic models and the new NCRP wound model will follow. The work also includes the evaluation of experimental results in terms of formulation by the new model structures and a quality assurance of model formulation. PMID:17556343
With steam generator check testing, the numerous types of defect not only have to be detected reliably but also to be identified correctly and classified according to depth. A priori, no signals are provided by the physical eddy-current mechanism, i.e. the disturbance of an excited eddy-current field by a defect, which will allow unambiguous identification and classification of the defects. The task, therefore, consists in designing the eddy-current method in terms of measurement technology in such a way as to obtain useful detection, identification and classification by a translation of the signals as simple and as save as possible. Internal through-flow wils and internal rotating probes were examined for their suitability to fulfill this three-pronged task with steam generator inspection.
With steam generator check testing, the numerous types of defect not only have to be detected reliably but also to be identified correctly and classified according to depth. A priori, no signals are provided by the physical eddy-current mechanism, i.e. the disturbance of an excited eddy-current field by a defect, which will allow unambiguous identification and classification of the defects. The task, therefore, consists in designing the eddy-current method in terms of measurement technology in such a way as to obtain useful detection, identification and classification by a translation of the signals as simple and as save as possible. Internal through-flow wils and internal rotating probes were examined for their suitability to fulfill this three-pronged task with steam generator inspection. (orig./RW).
In 2009, following approval of the European Marine Strategy Framework Directive (MSFD, 2008/56/EC), the European Commission (EC) created task groups to develop guidance for eleven quality descriptors that form the basis for evaluating ecosystem function. The objective was to provide European countries with practical guidelines for implementing the MSFD, and to produce a Commission Decision that encapsulated key points of the work in a legal framework. This paper presents a review of work carried out by the eutrophication task group, and reports our main findings to the scientific community. On the basis of an operational, management-oriented definition, we discuss the main methodologies that could be used for coastal and marine eutrophication assessment. Emphasis is placed on integrated ap...
Background:- Children with oppositional defiant disorder/conduct disorder (ODD/CD) have shown deficits in -cool- abstract-cognitive, and -hot- reward-related executive function (EF) tasks. However, it is currently unclear to what extent ODD/CD is associated with neuropsychological deficits, independently of attention deficit hyperactivity disorder (ADHD). Methods:- Fifty-nine adolescents with a history of early-onset oppositional problems, 28 with pure ODD/CD symptoms and 31 with ADHD with or without ODD/CD, and 34 healthy controls were administered a task battery measuring motor response inhibition, sustained attention, cognitive flexibility and reward-related decision-making. Findings were analysed using dimensional and group analyses. Results:- In group analyses both groups with and wit...
This report summarizes the results of Task 3 work that was initially discussed in our monthly reports for the period October 1, 1992 through September 30, 1993, and contained in our various papers and abstracts, both published and currently in press or in review. Our work during this period was involved (a) the continuation of studies begun prior to October, 1992, focussed mainly on aspects of the caldera geology, volcanic stratigraphy, magmatic activity, hydrothermal mineralization and extensional tectonics of the western and northwestern parts of the southwestern and Nevada volcanic field (SWNVF), studies of the subsurface rocks of Yucca Mountain utilizing drill hole samples obtained in 1991 and 1992, and (b) new studies of veins and siliceous rocks cropping out in northwestern Yucca Mountain that provide evidence for previously unrecognized hydrothermal activity during the Crater Flat Tuff period of volcanism.
A scheme for controlling multimanipulator systems is presented. The control objective is to coordinate the manipulators to perform parts-matching tasks such as screwing a nut onto a bolt. The task of moving a rigid object can be treated as a special case. Two secondary control objectives internal force control and load distribution can be accomplished within the structure of the control law. The internal force control mechanism keeps the internal forces on the object being manipulated at a desirable level. The load distribution mechanism distributes control effort to each manipulator according to a weighting factor. It is also shown that the control algorithm has a modular structure which facilitates its implementation on a multiprocessor computer. The scheme was tested on a planar scara type dual-manipulator system. A series of experimental results is included to demonstrate the system performance under various conditions.
In this paper we present an approach for supporting users in the difficult task of searching for video. We use collaborative feedback mined from the interactions of earlier users of a video search system to help users in their current search tasks. Our objective is to improve the quality of the results that users find, and in doing so also assist users to explore a large and complex information space. It is hoped that this will lead to them considering search options that they may not have considered otherwise. We performed a user centred evaluation. The results of our evaluation indicate that we achieved our goals, the performance of the users in finding relevant video clips was enhanced with our system; users were able to explore the collection of video clips more and users demonstrated a preference for our system that provided recommendations.
This document is furnished as part of the effort to develop NRC Class 1E Digital Computer Systems Guidelines which is Task 8 of USAF Rome Laboratories Contract F30602-89-D-0100. The report addresses four major topics, namely, computer programming languages, software design and development, software testing and fault tolerance and fault avoidance. The topics are intended as stepping stones leading to a Draft Regulatory Guide document. As part of this task a small scale survey of software fault avoidance and fault tolerance practices was conducted among vendors of nuclear safety related systems and among agencies that develop software for other applications demanding very high reliability. The findings of the present report are in part based on the survey and in part on review of software literature relating to nuclear and other critical installations, as well as on the authors' experience in these areas.
A methodology is proposed to facilitate the construction of gridded bathymetry data for the use of hydrodynamic models on the continental shelf. It relies on the carrying out of three successive tasks: (1) automatic selection of records of better quality among multiple sets of overlapping data; (2) elimination of data points located on land; and (3) taking into account the shoreline as bathymetric data. Algorithms are proposed to perform sorting of the records according to their quality as well as masking by the coastline. The suggested method facilitates the updating of bathymetry data and optimizes their use. It enables automatic execution of all the tasks and building of new digital bathymetry models in a few hours, without action from the operator. The method has been tested many times...
The United States Department of Energy (DOE) at the Morgantown Energy Technology Center (METC) contracted with P.S. Lowell and Co. Inc. (Lowell and Co.) and Jay S. Dweck, Consultant, Inc., (JSD) to enhance the capability of ASPEN in simulating coal gasification and oil shale processing plants. Of particular concern was the capability to predict the distribution of environmentally significant components among the various aqueous and organic liquids and gas streams within or leaving the process. The project was divided into major task areas. The first was to develop and implement the calculational routines necessary for predicting aqueous electrolyte chemical reactions. Part of this effort also was to select a species list and collect and/or regress data for the necessary parameters. The second task was to develop and implement a multi-phase flash capability (including precipitated solids) and unit operations models for a venturi and a ...
This paper summarizes the findings from an exploratory definition of a usage strategy for multiple control centre wall displays in CANDU nuclear power plants. Wall displays are defined as large sized, vertically oriented display surfaces that may be positioned in various locations about a control room to support user information needs. The paper begins by discussing the need for a usage strategy for all control room information resources, and then reviews the history in wall display implementation and usage in nuclear power plant control rooms. The balance of the paper discusses the approach used in characterization and review of control room task information needs and definition of a wall display usage strategy. The paper concludes by outlining some of the possible impacts on future control room design and operations that the introduction of wall displays may imply. (author)
The six-axes industrial robot MANUTEC r15 UW was modified to work underwater and successfully tested down to the simulated water depth of 1100 m. Next step in the program was to use this robot as a handling tool for inspection tasks at the welding seam of an underwater structure conducted with CCD-cameras and distance sensors. This was also to demonstrate the possibility to assist and later on to replace divers from this work. Additional research was focussed on the stiffness and rigidity of the robot during the precise guiding of tools and workpieces under current water conditions up to a flow velocity of 1.1 m/s. Present work is concentrated on the application of this subsea robot on a maintenance task at the Brazilian underwater template OCTOS-1000. For this experiments the robot is integrated in a large mock-up which simulates a quarter section of this template. (orig.)
The vigilance reinforcement hypothesis (VRH) asserts that errors in signal detection tasks are partially explained by operant reinforcement and extinction processes. VRH predictions were tested with a computerized baggage screening task. Our experiment evaluated the effects of signal schedule (extinction vs. variable interval 6 min) and visual field complexity (dial vs. baggage x-ray) on search behavior rates. There was a main effect for signal schedule [F (1, 20) = 14.0, p = 0.001, p[subscript rep] = 0.99], but no effects for field complexity or interaction. The VRH suggests that performance errors in visual screening work may be reduced through operant conditioning of search behaviors by intensive management of artificially planted signals. (Contains 1 table and 3 figures.)
This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
The research documented herein was funded by a research contract between the Research Reactors Division (RRD) of Oak Ridge National Laboratory (ORNL) and the University of Tennessee, Knoxville (UTK) Mechanical, Aerospace and Biomedical Engineering Department (MABE). The research was governed by a statement of work (SOW) which clearly defines nine specific tasks. This report is outlined to follow and document the results of each of these nine specific tasks. The primary goal of this phase of the research is to demonstrate, through verification and validation methods, that COMSOL is a viable simulation tool for thermal-hydraulic modeling of the High Flux Isotope Reactor (HFIR) core. A secondary goal of this two-dimensional phase of the research is to establish methodology and data base libraries that are also needed in the full three-dimensional COMSOL simulation to follow. COMSOL version 3.5a was used for all of the models presented throughout ...
BackgroundThe typical Korean diet includes rice, which is usually served in a rice bowl. We investigated the effects of a meal plan using rice bowls of varying sizes on dietary energy...Full Text Available
The salient features of the near-infrared free-electron laser (FEL) that is under construction at the new Darmstadt superconducting 130-MeV electron accelerator are discussed. Special attention is given to the layout and the parameters of the accelerator, the layout of the planned FEL experiment, the characteristics of the electron gun, the subharmonic chopper-buncher system, and the hybrid undulator system of the Darmstadt FEL. A comparison of the planned Darmstadt FEL with conventional lasers, with respect to the pulse and wavelength region, is presented. 15 refs.
Energy sector is relatively easy to evaluate economically. There have existed reliable statistics on energy systems and consumption and the planning has been based on them. However the environmental factors have been integrated into the Danish energy policy first in the nineties, and the new socio-economic evaluations have to take the pollution abatement measures into account. (EG)
The report presents an integrated software system developed at the Norwegian Electric Power Research Institute (EFI), for production scheduling, maintenance handling, network security analysis, inflow forecasting, and load forecasting. The integrated software is being developed with focus on hydro-dominated power supply systems. In specific terms it is expected that application of the software will improve the operational decisions, and make the planning process more effective. The optimal scheduling of hydro resources poses severe computational problems in system operations planning. This necessitates problem decomposition. In the EFI approach, planning is split into three main levels: long-term, mid-term and short-term planning. The long-term planning aims at evaluating the seasonal and pluriannual handling of regional storages in view of firm power supply obligations, inflow ...
The aim of this report is to show how Energetic Planning and Territorial Policy should be working together for a better integration of Renewable Energies into Region. This Integration should to contemplate social, economic and environmental aspects of the territory. The report has been classified into 7 items: planning, energetic scenarios, technology transfer for Renewable Energies dissemination, barriers for this dissemination, environmental aspects, European Union Policy and Decision Support Systems (and specially GIS). (Author) 54 refs.
The paper deals with the disposal of radioactive waste and the plans for dealing with solid wastes of intermediate and low levels of activity, which are the responsibility of NIREX. NIREX is an executive body which co-ordinates the waste-disposal plans of the main radioactive waste producers. The disposal routes for the active wastes are described including the deep disposal of wastes containing material that will remain active for thousands of years. Requirements for deep burial are outlined with reference to the geology and hydrogeology of the site. Monitoring, maintenance and surveillance are mentioned for the protection of the public.
This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
This Test Plan outlines the testing to be done on the Special Protective Coating (SPC) Polyurea which includes: Tank Waste Compatibility, Decontamination Factor Testing, and Adhesion Strength Testing after a sample has been exposed to Radiation.
A focused ion beam (FIB) system has been applied to prepare a thin foil specimen of Si, MgO and alumina which contained cracks in the plan of foil. It was possible to observe a much larger area at and near a crack tip than has been hitherto possible. FIB was also applied to observation of microstructure near a crack tip evolved during severe rolling contact fatigue in a steel.
... orthopaedics, waiting times, NHS, private hospitals,health news, medical news, health services, medical treatments, health tips NHS ...be sent to private hospitals for surgery in a bid to bring orthopaedic waiting times under control. Plan to send NHS patients for ...
In accordance with the comprehensive plan in the eleventh five-year period the main content of prospecting and exploration on land in Axerbaidzhan by the Axneft' association will be done in the central and Western regions of the republic, where Paleogene-Mesozoic deposits will be inspected. Discussed in detail are the directions and volumes of prospecting and exploration in individual regions of Azerbaidzhan. They are determined with consideration of the degree of exploration of the earth's interior, the prospects for the deposits comprising them, and the development of the resources of oil.
Denmark has been one of the first countries in the world to commit itself to a sustainable energy development. This has been substantiated by two official action plans from 1990 and 1996 with emphasis on energy efficiency and supply systems based on renewable energy. In year 2005, renewable energy sources are planned to cover 12-14% and in year 2030 about 35% of total Danish energy demand. This paper reviews the experiences with implementation of renewable energy in Denmark with a focus on wind power and biomass.
The purpose of this analysis is to develop a systematic program of projects that will result in energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan for the Stratford Army Engine Plant in Stratford, Connecticut. Reduced energy consumption is a stated goal for the Army Facility Energy Plan.
Describes the Indonesian system of education of Islamic schooling, secular education, and out-of-school education. The provision of 9-year universal basic education is planned by 2004. The national plan challenges the education system to facilitate the change in Indonesia's economic structure from an agriculturally based system to one more dependent on manufacturing and service industries. (SLD)
...htm Waste Framework Directive 75/442/EEC (amended by Directive 91/156/EEC) and Waste Management Planning http://ec.europa.eu/environment/waste/plans/index.htm Selected EC commissioned/supported projects including LCA IPP Pilot Product exercise on mobile phones and on tropical garden furniture http://ec.europa.eu/environment/ipp/pilot.htm \\
A simplified stormwater management model has been developed to provide an inexpensive, flexible tool for planning and preliminary sizing of stormwater facilities. The model was developed to be part of a methodology for use in the management of stormwater that utilizes both simple...
Supplement B to the Terra Nova Development Application provides a description of the floating production storage and offloading (FPSO) vessel system selected for the development, a summary of the reasons for selecting the system, and the impact of this selection on the Development Plan, the Benefits Plan, the Environmental Impact Statement and the Socio-Economic Impact Statement. There is also a description of the contractor alliance approach to be used in the Terra Nova Development. Refs., tabs., figs.
A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)
Three book reviews and five essays address the problems of governing coastal regions. The books reviewed and the articles covered the institutions and programs involved in resource management, the balance of local and state interests in coastal conservation and developments, a consensus on coastal planning issues, and a growing trend in state-local collaborative planning. Four of the articles pertain to California, and one focuses on programs in Maine, Rhode Island, and Washington. 135 references. (DCK)
DescriptionThe overall aim of this application is to examine experimentally environmental influences on the pattern of senescence in birds. We plan to experimentally uncouple chronological age and reproductive effort and examine their effects on reproductive performance and lifespan. We also plan to examine experimentally how these relationships are influenced by nutritional conditions during early development. We will combine the organismal fitness measures of lifespan and reproductive performance with me [continued...
42 Public Health 3 2010-10-01 2010-10-01 false Health benefits plan: Basic health services. 417.101 Section 417.101 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND...
Secretary Cheney's 1990 Annual Report to the President and the Congress established the requirement for the Unified Commanders in Chief to be prepared for Third World conflict involving roles and missions requiring, 'mobile, highly ready, well equipped fo...
The interpretation of solution hydrodynamic data in terms of macromolecular structural parameters is not a straightforward task. Over the years, several approaches have been developed to cope...Full Text Available
Multiple memory systems are involved in parallel processing of spatial information during navigation. A series of studies have distinguished between hippocampus-dependent ‘spatial’ navigation,...Full Text Available
This research activity emphasizes the systems definition and resulting structural requirements for the primary structure of two potential SPS large space structure test articles. These test articles represent potential steps in the SPS research and technology development.
This document presents the SSI preliminary views and position concerning the decommissioning of nuclear plants. To prevent the exposure of the decommissioning personnel and the general public to unacceptable levels of radiation and to protect the environment and future generations, it is SSI`s task to formulate and issue the necessary terms and regulations with which the reactor licensees must comply during the decommissioning work. The views and principles presented here are the basis of SSI`s continued work on guidelines and regulations for the decommissioning of nuclear plants.
During the first 18 months of this project, four experimental subtasks were to have begun but only one of these was to have been completed. Additionally, five modeling subtasks were scheduled to begin, four of which were to have been completed. We are on schedule for all but one of these subtasks. All four experimental tasks are progressing on schedule. Initial durability tests were completed. The conclusions drawn from this first round of durability tests are being used to design the next set of tests. Initial baseline engine data were acquired and showed that the engine selected for this task behaves as hoped. However, the dyno controller is inadequate. The engine will be moved to another dyno during the near future. The modeling tasks are also progressing well. A model for the dynamic response of the ignition circuit was developed and validated. Two technical papers resulting from this model were submitted for ...
Quantum computers hold the promise of solving certain computational tasks much more efficiently than classical computers. We review recent experimental advances towards a quantum computer with trapped ions. In particular, various implementations of qubits, quantum gates and some key experiments are discussed. Furthermore, we review some implementations of quantum algorithms such as a deterministic teleportation of quantum information and an error correction scheme.
Only two years ago, plastic film recycling was considered an onerous task. Different resins had to be identified, colors had to be separated, and minute contaminants had to be weeded out almost by hand to produce a quality material. But the tide of plastic film recycling is changing now that new technologies have emerged and more organized collection infrastructure have been developed. Today, plastic film recycling maintains a lucrative market for those with the right combination of equipment and know-how.
The Subseabed Disposal Project (SDP) was part of an international program that investigated the feasibility of high-level radioactive waste disposal in the deep ocean sediments. This report briefly describes the seven-step iterative performance assessment procedures used in this study and presents representative results of the last iteration. The results of the performance are compared to interim standards developed for the SDP, to other conceptual repositories, and to related metrics. The attributes, limitations, uncertainties, and remaining tasks in the SDP feasibility phase are discussed.
The systems analyses and optimization studies performed in connection with a program to design and evaluate a commercial 663 MWe coal-fired combined cycle power plant using pressurized fluidized bed combustion and advanced technology in the hot gas cleanup system and gas turbines are presented. Details on the plant control system are included. (LCL)
Research is being carried out in this project in two areas which are of interest to ongoing investigations at the Pittsburgh Energy Technology Center (PETC). They are: (a) thermal behavior of slurry reactors used for indirect coal liquefaction; and (b) coal liquefaction under supercritical conditions. The current status of each of these tasks is summarized in this report. 76 refs., 23 figs., 6 tabs.
Research is being carried out in this project in two areas which are of interest to ongoing investigations at the Pittsburgh Energy Technology Center (PETC). They are: (1) behavior of slurry reactors used for indirect coal liquefaction, and (2) coal liquefaction under supercritical conditions. The current status of each of these tasks is summarized in this report.
Substantial damages at main components of steam turbines do not have to result inevitably in an exchange of the components concerned. Rather a preliminary or final repair is possible which also considers the cause of the damage. An important condition with the technically complex questions is an appropriate qualification and experience of all involved persons. The common task of operators, manufacturers and insurance companies is to preserve the balance from costs, expenditure of time and risk.
With the lifting of the top dome of the Windscale (AGR) Advanced Gas-cooled Reactor earlier this year, the decommissioning team has begun to dismantle the heaviest of the reactor components. In defining the tasks involved, the most important criterion was to minimise the radiation exposure expected to be received by the team members. The manager of the WAGR decommissioning project describes the preparation undertaken and the final lifting of the top dome in this article. (author).
Task 13 (a) was approved on December 21, 2001. Minimal work was performed for the quarter during the approval process. Laboratory and equipment facilities have been maintained in anticipation of the work to be done. The PI communicated with DOE and Estonia researchers during this period, providing advice and direction for the startup of the Estonia research, and preparing a Draft Teaming Agreement. The PI participated in an industrial liaison meeting with DOE personnel. This meeting is expected to lead to formal cooperation between industry and government.
Space HVAC systems are to provide hygienical room air. Air change is necessary because of pollutants released from materials or production processes but also because of the presence of humans or animals who consume oxygen. Poor room climate and/or poor air hygiene do not only reduce the felt comfort but may also result in a loss or profitability and higher sickness rates. (orig.)
The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details.
This report presents the work performed at the Institute of Gas Technology (IGT) during the second program quarter from October 1, 1993 to December 31, 1993, under Department of Energy (DOE) Contract No. DE-AC22-93PC92114. This program has co-ordinated funding for Task 1 from IGT`s Sustaining Membership Program (SMP), while DOE is funding Tasks 2--8. Progress in all tasks are reported. The overall objective of this research project is to develop a catalytic process to convert natural gas to liquid transportation fuels. The process consists of two steps that each utilize catalysts and sulfur containing intermediates: (1) to convert natural gas to CS{sub 2} and (2) to convert CS{sub 2} to gasoline range liquids. Experimental data will be generated to demonstrate the potential of catalysts and the overall process. During this quarter, progress in the following areas has been made. An existing unit at IGT was modified to ...
The Fusion Technology task performs analyses and systems studies of conceptual fusion reactors based upon inertial and high-#beta# magnetic confinement schemes. Progress in the areas of theoretical analysis (plasma and neutral-gas blanket models), specific reactor studies (toroidal and linear theta pinches, Z pinches, laser fusion) neutronic and nuclear data assessments, materials (metals and insulators) evaluation, and general engineering design is reported.
In November 1998, President Clinton charged the National Bioethics Advisory Commission with the task of conducting a thorough review of the issues associated with human stem cell research, balancing all ethical and medical considerations. The President's ...
Focuses on the application of remote sensing techniques to the study of coal waste mounds. The situation at the coal waste mounds in Fukuoka, Japan is cited. Guidelines on film parameters, photographic keys and tasks required to inventory, monitor and manage coal waste mounds in Japan are addressed. Application of photogrammetry, remote sensing, aerial photography and satellite imagery techniques in monitoring spoil banks is reviewed. Applicability of the techniques is discussed. 24 refs.
Characterization of the electron beam's properties will be a major task after the upgrade of the Los Alamos Free-Electron Laser (FEL) Facility with a photoelectric injector (PEI) and increased acceleration capability to 40 MeV. Adjustments to the previous diagnostics package that address the lower beam emittance, higher energy, and wakefield source reduction issues will be discussed. 6 refs., 8 figs., 1 tab.
The technology status of the dynamics and controls discipline as it applies to energy storage wheel systems was evaluated. No problems were identified for which an adequate solution could not be proposed. Design issues that influence control were addressed. The dynamics and control aspects associated with the energy storage system concept and its various constituent parts, and the control tasks attendant to large, manned spacecraft are discussed.
Using the Philips DRM distributed real-time multiprocessing system, designers can implement high-performance computer systems using VME hardware and the C programming language. The system provides a virtual-processing environment in which several 68000 CPUs share the workload. There are no centralized components, and tasks can be assumed by the rest of a system in the event of an individual processor's failure.
Abstract In his, -Descartes' Ontology of Thought-, Alan Nelson presents, on Descartes' behalf, a compositional theory of mental representation according to which the content of any mental representation is either simple or is entirely constituted by a combination of innate simples. Here the simples are our ideas of God, thought, extension, and union. My objection will be that it is simply ludicrous to think that any four simples are adequate to the task of combining to constitute all of human thought, and that the simples God, thought, extension, and union are particularly ill suited to it.
Equations are compiled for thermal balance in which for simplification, no consideration is made for heat conductivity along the axis of the cable and dependence of losses, heat capacitance and heat conductivity on temperature. Equations are modeled on a transistor analog calculator 42 TA. The solution to the task on the computer produced values of maximum temperature on the cable and coordinates of the point of maximum overheating. Using the analog model, one can study other parameters of the thermal mode.
Emerging high-power microwave technologies require that bioeffects of exposure to this type of radiation be investigated for health and safety considerations. Disruption of animal behavior is reported to be a sensitive indicator of microwave exposure. Three behavioral tasks were chosen for this initial investigation of exposure to U.S. Air Force high-power microwave emitters. The tasks were: (1) single-trail avoidance, (2) water satiation, and (3) rotarod performance. Exposure to high-power microwave radiation from the USAFSAM peak-power simulator significantly affected the single-trail avoidance task. Neither the single-trail avoidance task nor rotarod performance was affected by the Gypsy emitter. However, animals exposed to 9-kW and 11-kW outputs from the USAFSAM emitter spent significantly less time imbibing water postexposure than sham-exposed animals. The most consistent finding in the animals ...
An American Society of Mechanical Engineers task group on stainless steel weld materials was organized to determine the need for ferrite measurements of production welds required by the US Nuclear Regulatory Commission Regulatory Guide 1.31 (Rev. 1). The task group studied paired ferrite measurements (i.e., calculated and measured ferrite numbers (FNs) for the material qualifications versus measured ferrite numbers for corresponding production welds (PWs)). Our purpose was to compare delta-ferrite content as measured in the filler metal weld qualification pad with that in the resultant PW. Welds made predominantly by three common processes (submerged arc, shielded metal arc, and gas tungsten arc) were included in the study. Weld metals investigated included types 308, 308L, 316, and 316L stainless steel. An initial evaluation of the paired ferrite measurements was made by the task group, and specific conclusions and ...
DNA isolation procedures significantly influence the outcome of PCR-based detection of human pathogens. Unlike clinical samples, DNA isolation from food samples such as fresh and fresh-cut produce has remained a formidable task and has hampered the sensitivity and accuracy of molecular methods. We...
We propose a novel scheme for scalable solid state quantum computing, where superconducting microwave transmission line resonators (cavities) are arranged in a two-dimensional grid on the surface of a chip, coupling to superconducting qubits (charge or flux) at the intersections. We analyze how tasks of quantum information processing can be implemented in such a topology, including efficient two-qubit gates between any two qubits on the grid and elements of fault-tolerant computation.
A new three-dimensional treatment planning system (TPS) based on convolution/superposition algorithms (TMS-Radix from HELAX AB, Uppsala, Sweden) was recently installed at the University Hospital in Lund. The purpose of the present study was to design a quality assurance and acceptance testing programme to meet the specific characteristics of this convolution model. The model is based on parametrization of a non-measurable quantity - the polyenergetic pencil beam. However, the verification of the treatment planning model is still dependent on numerous comparisons of measured depth-doses and dose profiles. The test programme was divided in two basic parts: (i) model implementation and beam data consistency and (ii) model performance and limitations in special situations. The first part was scheduled for all photon beam qualities available before they could be used for clinical treatment planning. The second part was performed ...
The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management ...
Many governments around the world are focusing on emissions reduction through energy efficiency improvements, particularly on the demand side. Although Integrated Resource Planning (IRP), which considers both supply-side and demand-side options, had been a useful tool in the planning process for the power industry, its effectiveness has been challenged recently with the restructuring of the power sector that has occurred in China and elsewhere around the world. The paper proposes Integrated Resource Strategic Planning (IRSP) as an alternative to IRP in a deregulated power sector. IRSP takes the resource planning process one step further to the national level. In this paper, the authors demonstrate the tremendous potential for efficiency improvements on both the supply and demand sides of the power sector in China with IRSP. The results show that between 2009 and 2020, the potential for electricity ...
Many governments around the world are focusing on emissions reduction through energy efficiency improvements, particularly on the demand side. Although Integrated Resource Planning (IRP), which considers both supply-side and demand-side options, had been a useful tool in the planning process for the power industry, its effectiveness has been challenged recently with the restructuring of the power sector that has occurred in China and elsewhere around the world. The paper proposes Integrated Resource Strategic Planning (IRSP) as an alternative to IRP in a deregulated power sector. IRSP takes the resource planning process one step further to the national level. In this paper, the authors demonstrate the tremendous potential for efficiency improvements on both the supply and demand sides of the power sector in China with IRSP. The results show that between 2009 and 2020, the potential for electricity ...
In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the ...
The Hazardous Material Management and Emergency Response Training and Education Center -- known simply as HAMMER -- is being developed to assist the US Department of Energy (DOE) and others dedicated to improving worker health, safety and productivity. HAMMER is a training and education program for hazardous material, waste management, and emergency response workers. HAMMER is managed by the DOE Richland Operations Office under Work Breakdown Structure (8.2). The 1996 Multi-Year Program Plan (MYPP) includes the Execution Year data and provides the information for Programmatic Fiscal Year Site Management System Execution Baseline, as well as the detailed work plan for performance evaluation of the authorized work. The MYPP incorporates various planning methodologies to define the program and provides essential program integration, and a fully developed technical, cost, and schedule baseline. The MYPP will be utilized by WHC ...
In response to US Department of Energy directives, Argonne National Laboratory (ANL) has developed a waste minimization plan aimed at reducing the amount of wastes at this national research and development laboratory. Activities at ANL are primarily research- oriented and as such affect the amount and type of source reduction that can be achieved at this facility. The objective of ANL's waste minimization program is to cost-effectively reduce all types of wastes, including hazardous, mixed, radioactive, and nonhazardous wastes. The ANL Waste Minimization Plan uses a waste minimization audit as a systematic procedure to determine opportunities to reduce or eliminate waste. To facilitate these audits, a computerized bar-coding procedure is being implemented at ANL to track hazardous wastes from where they are generated to their ultimate disposal. This paper describes the development of the ANL Waste Minimization Plan ...
Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level
The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to ...
Reporting of the first nuclear trafficking incidents began in the early 1990's. The incidents were handled on a national level, using the resources and expertise available in the respective states. However, it soon became evident that fighting this illicit movement of nuclear material across borders would require international cooperation and a systematic and methodological approach. To this end, the G-8 states encouraged the creation of a dedicated group of experts. The Nuclear Smuggling International Technical Working Group (ITWG) was created in the mid 1990's under the auspices of the G-8, following the 1995 Ottawa summit and the 1996 nuclear security summit held in Moscow. The group reports regularly to the Nuclear Safety and Security Group (NSSG) of the G-8. The ITWG has been working towards a sustainable mechanism to help resolve the international problem surrounding combating the illicit trafficking of nuclear material. In consequence, the technical focus has been on ...
This plan establishes a Department-wide goal to reduce total releases of toxic chemicals to the environment and off-site transfers of such toxic chemicals by 50 percent by December 31, 1999, in compliance with Executive Order 12856. Each site that meets the threshold quantities of toxic chemicals established in the Emergency Planning and Community Right-to-Know Act (EPCRA) will participate in this goal. In addition, each DOE site will establish site-specific goals to reduce generation of hazardous, radioactive, radioactive mixed, and sanitary wastes and pollutants, as applicable. Implementation of this plan will represent a major step toward the environmental risks and costs associated with DOE operations and increasing the Department's use of preventive environmental management practices. Investing in Waste Minimization Pollution Prevention (WMin/PP) steadily reduce hazardous and radioactive waste generation and will ...
The performance of a convolution/superposition based treatment planning system depends on the ability of the dose calculation algorithm to accurately account for physical interactions taking place in the tissue, key components of the linac head and on the accuracy of the photon beam model. Generally the user has little or no control over the performance of the dose calculation algorithm but is responsible for the accuracy of the beam model within the constraints imposed by the system. This study explores the dosimetric impact of limitations in photon beam modeling accuracy on complex 3D clinical treatment plans. A total of 70 photon beam models was created in the Pinnacle(TM) treatment planning system. Two of the models served as references for 6 MV and 15 MV beams, while the rest were created by perturbing the reference models in order to produce specific deviations in specific regions of the calculated dose profiles ...
The DEFENSE WASTE MANAGEMENT PROGRAM has been chartered by the Department of Energy (DOE) to receive, reduce, store, and maintain all radioactive defense waste generated by Hanford and received from offsite DOE contractors in a safe condition and in accordance with DOE and Westinghouse Hanford Company (WHC) standards. These activities are accomplished through the use of TRU retrievable storage sites, solid waste burial grounds, liquid waste storage tanks, capsule storage pools, and other low-level waste disposal methods. Continuous and/or periodic surveillance is maintained. Through the use of improved packaging methods, evaporator-crystallization and capsule production waste has been and continues to be put in a safe and economic storage condition pending future reprocessing or final disposition. For this Program Plan, the scope of Defense Waste Management programmatic activities has been organized into three general categories. A summary outline of the work ...
The paper discusses the methodology used at Electricidade de Portugal (EDP) in planning its electric power system. In particular, it considers a description of the methodology used by EDP for a more accurate definition of the input data required to characterize hydroelectric plants and the evaluation of their impact on an optimal long-term expansion plan. In addition, the paper describes an analysis of the results of studies, both with WASP-II and WASP-III, with and without pumped storage plants, respectively. Finally, the paper details the use of VALOR AGUA, in conjunction with WASP, for a better simulation of the hydroelectric system and which also permits to solve other problems closely connected such as the calculation of marginal production costs. (author).
Integrated resource planning is rapidly emerging as the preferred planning process for electric utilities. Under IRP, planners project the initial and annual operating costs of different resource options and compare them using the revenue-requirements method (RRM)- a project-evaluation technique that discounts future costs (i.e., revenue requirements) into present values. The discount rate used for these computations is usually the firm's weighted-average cost of capital (WACC)-the weighted-average cost of the firm's equity and debt. The project alternative with the lowest present-value revenue requirement (PVRR) (i.e., lowest costs) emerges as the economic choice.
Boron neutron capture therapy (BNCT) trials for human glioma (glioblastoma multiform) were initiated September 1994 at the Brookhaven National Laboratory (BNL). Patients are given p-boronophenylalanine-fructose (BPA-F) intravenously as the boron carrier followed by exposure to the epithermal-neutron beam at the Brookhaven Medical Research Reactor (BMRR). The initial phase of the study is to determine safety and toxicity of the drug and irradiation procedure. The epithermal-neutron beam was developed in a joint effort by BNL and Idaho National Engineering Laboratory (INEL) researchers. For the human trials, treatment planning and radiation dose estimation is performed using the BNCT-Rtpe and the rtt-MC computer codes developed by the INEL BNCT program. This paper discusses our initial experience using these treatment planning codes for human subjects. The basic principles of BNCT have been previously documented.
Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific emergency response ...
Thirty-nine conference papers review practical and topical aspects of hydroelectric development, from planning and design to construction, operation and refurbishment. More than half of the papers deal with small-scale hydro, reflecting the continuing strong interest in this subject throughout the world. The planning and economic evaluation of large-scale hydro schemes and pumped-storage plants, and environmental aspects of hydroelectric developments are also discussed. A special session has also been included on hydro in Latin America, where some of the world's largest schemes are planned or under construction. The papers reproduced here draw on the expertise of engineers from eighteen countries in North and South America, Europe, Asia, Australasia and Africa. All the papers were selected and indexed separately.
Canada has undertaken to stabilize greenhouse gas emissions to 1990 levels by the year 2000. To achieve that objective, a voluntary challenge registry (VCR) plan was initiated by the federal and provincial governments to encourage industry, governments, and public sector to take voluntary actions that would contribute to the reduction of greenhouse gas emissions. The initiatives that CAPP member companies have taken were outlined in CAPP's 1995 Action Plan: Climate Change Voluntary Challenge, which was included with this report. The measures reported to date resulted in CO_2 reductions of 812,722 tonnes per year. The report provided a chronological review of CAPP actions in the field of climate changes since 1989, a summary of member action plans, and a listing of new technologies and their impact on greenhouse gas emissions.
The objective of this study is to establish a construction plan for vibration analysis system of HANARO's rotating machinery. To achieve this purpose, as a first step, the references related to the vibration analysis system for the rotating machinery were investigated. In addition, to verify the possibility of condition monitoring of the pumps, vibration signals obtained from the vibration monitoring system were analyzed. The results show that using the accelerometers mounted on the bearing locations of the pumps can monitor the current status of the pump such as unbalance, misalignment, and bearing condition. Based on the results of this study, the construction plans for the vibration analysis system of HANARO have been established. The hardware of the vibration analysis system will be installed by the end of this year. It is expected that the developed vibration analysis system can be utilized for the realization of the preventive ...
The authors have been developing a 3D brain CT image display system for planning of craniofacial operations. This system helps doctors plan craniofacial operations on a graphic display (GD) terminal by rendering 3D images reconstructed from a set of slices. The authors reveal how the system generates 3D shapes of organs from given CT images and how it modifies or transforms the obtained shapes according to the user's request. The system functions now available are extraction and display of the skull and the skin, measurement of the distance between two points on the skull given through the GD terminal, and generating and eliminating a polygonal region arbitrarily given on the skull as an operative region. (Auth.).