WorldWideScience
 
 
1

FY1999 Meeting of The Society of Heating, Air-Conditioning and Sanitary Engineering of Japan. Thermal simulation I; 1999 nendo gakujutsu koenkai gaiyo. Onnetsu simulation 1  

Energy Technology Data Exchange (ETDEWEB)

E-35 reported the specific air flow analysis program using a CFSV model (including a human body model) to develop a high-accuracy evaluation simulator for heterogeneous thermal environment based on human thermal physiological conditions. E-36 reported development of the radiation heat transfer analysis module by using a numerical integral method to calculate shape factors. Radiation heat transfer characteristics every body part were clarified quantitatively by this module. E-37 reported the results on continuous measurement of physiological conditions and thermal environment factors every monitor under controlled indoor thermal environment, to collect measurement data necessary for improving the accuracy of a prediction program for human body temperatures. E-38 reported the study result on physiological reaction and subjective evaluation through an examinee experiment in a blood controlled region, to collect basic data for the above improvement. E-39 reported the study result on the ...

1999-12-05

2

Construction method of the artificial iced bobsleigh and luge track. Aiming at the Nagano Winter Olympic Games; Tekkin concrete sei bobsleigh luge track no kensetsu. Nagano Olympic toki kyogi taikai wo mezashite  

Energy Technology Data Exchange (ETDEWEB)

The reinforced concrete artificial iced course, constructed first in Japan as a bobsleigh and luge track for the Nagano Olympic Games, has a total extension of 1,700 m and an altitude difference of 113 m. It contains 15 curves and 2 up-grades and is divided into 43 blocks with spans ranging from 20 m to 80 m, all of which consist of lightwall RC members supported by pile foundations. The surface is cooled to -15 centigrade by the cooling pipes embedded in concrete and is iced by spraying water, and iced surface is shaved to make a course. Since the course scarcely has same profiles, the finished wall thickness is secured by fixing wire gauzes on the required positions without using shutterings. As there is not existed concrete satisfying all the required quality, two kinds of concrete were selected for filling in the arrangement of reinforcement and pipes and for surface finishing. Special notice was taken of the accuracy of finished surface. For the construction of the artificial iced ...

1996-03-10