WorldWideScience

Sample records for sampling plan vol

  1. Special nuclear material inventory sampling plans

    International Nuclear Information System (INIS)

    Vaccaro, H.; Goldman, A.

    1987-01-01

    Since their introduction in 1942, sampling inspection procedures have been common quality assurance practice. The U.S. Department of Energy (DOE) supports such sampling of special nuclear materials inventories. The DOE Order 5630.7 states, Operations Offices may develop and use statistically valid sampling plans appropriate for their site-specific needs. The benefits for nuclear facilities operations include reduced worker exposure and reduced work load. Improved procedures have been developed for obtaining statistically valid sampling plans that maximize these benefits. The double sampling concept is described and the resulting sample sizes for double sample plans are compared with other plans. An algorithm is given for finding optimal double sampling plans that assist in choosing the appropriate detection and false alarm probabilities for various sampling plans

  2. Special nuclear material inventory sampling plans

    International Nuclear Information System (INIS)

    Vaccaro, H.S.; Goldman, A.S.

    1987-01-01

    This paper presents improved procedures for obtaining statistically valid sampling plans for nuclear facilities. The double sampling concept and methods for developing optimal double sampling plans are described. An algorithm is described that is satisfactory for finding optimal double sampling plans and choosing appropriate detection and false alarm probabilities

  3. IAEA Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geist, William H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  4. A comparison of attribute sampling plans

    International Nuclear Information System (INIS)

    Lanning, B.M.

    1997-05-01

    This report describes, compares, and provides sample size selection criteria for the most common sampling plans for attribute data (i.e., data that is qualitative in nature such as Pass-Fail, Yes-No, Defect-Nondefect data). This report is being issued as a guide in prudently choosing the correct sampling plan to meet statistical plan objectives. The report discusses three types of sampling plans: AQL (Acceptable Quality Level expressed as a percent), RQL (Rejectable Quality Level as a percent), and the AQL/RQL plan which emphasizes both risks simultaneously. These plans are illustrated with six examples, one of which is an inventory of UF 6 cans whose weight must agree within 100 grams of its listed weight to be acceptable

  5. 12-EEASA-Vol 22.indd

    African Journals Online (AJOL)

    jenny

    2006-02-22

    Feb 22, 2006 ... Southern African Journal of Environmental Education, Vol. .... To this end, a planning conference on environmental .... mathematics, physics, chemistry, biology, geography, agriculture, home economics and human and.

  6. 40 CFR 141.802 - Coliform sampling plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...

  7. ECONOMICS OF ALEXANDER THE GREAT (15 vols + 4 cdroms) by Gregory Zorzos

    OpenAIRE

    Gregory Zorzos

    2002-01-01

    Research contains many ancient texts (Ancient Greek, Hebrews, Hieroglyphs, Assyrian, Sumerian, Babylonian, Latin, etc.). 1. (MICRO-MACRO ECONOMICS OF ALEXANDER THE GREAT (5 vols + cdrom). Microeconomics and macroeconomics of Alexander the Great. Economic theories, feasibilities, economic plannings, general description of the campaign's business plan etc. 2. BANKS OF ALEXANDER THE GREAT (2 vols + cdrom) Describes banking system, economists, financiers, investors, accountants, bookkeepers, etc,...

  8. Waste classification sampling plan

    International Nuclear Information System (INIS)

    Landsman, S.D.

    1998-01-01

    The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998

  9. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  10. Statistical sampling plans

    International Nuclear Information System (INIS)

    Jaech, J.L.

    1984-01-01

    In auditing and in inspection, one selects a number of items by some set of procedures and performs measurements which are compared with the operator's values. This session considers the problem of how to select the samples to be measured, and what kinds of measurements to make. In the inspection situation, the ultimate aim is to independently verify the operator's material balance. The effectiveness of the sample plan in achieving this objective is briefly considered. The discussion focuses on the model plant

  11. Hanford site transuranic waste sampling plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed

  12. Appendix E - Sample Production Facility Plan

    Science.gov (United States)

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  13. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    International Nuclear Information System (INIS)

    T. Haney R. VanHorn

    2007-01-01

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used to determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality

  14. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  15. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  16. Final Sampling and Analysis Plan for Background Sampling, Fort Sheridan, Illinois

    National Research Council Canada - National Science Library

    1995-01-01

    .... This Background Sampling and Analysis Plan (BSAP) is designed to address this issue through the collection of additional background samples at Fort Sheridan to support the statistical analysis and the Baseline Risk Assessment (BRA...

  17. Integrated sampling and analysis plan for samples measuring >10 mrem/hour

    International Nuclear Information System (INIS)

    Haller, C.S.

    1992-03-01

    This integrated sampling and analysis plan was prepared to assist in planning and scheduling of Hanford Site sampling and analytical activities for all waste characterization samples that measure greater than 10 mrem/hour. This report also satisfies the requirements of the renegotiated Interim Milestone M-10-05 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). For purposes of comparing the various analytical needs with the Hanford Site laboratory capabilities, the analytical requirements of the various programs were normalized by converting required laboratory effort for each type of sample to a common unit of work, the standard analytical equivalency unit (AEU). The AEU approximates the amount of laboratory resources required to perform an extensive suite of analyses on five core segments individually plus one additional suite of analyses on a composite sample derived from a mixture of the five core segments and prepare a validated RCRA-type data package

  18. Group Acceptance Sampling Plan for Lifetime Data Using Generalized Pareto Distribution

    Directory of Open Access Journals (Sweden)

    Muhammad Aslam

    2010-02-01

    Full Text Available In this paper, a group acceptance sampling plan (GASP is introduced for the situations when lifetime of the items follows the generalized Pareto distribution. The design parameters such as minimum group size and acceptance number are determined when the consumer’s risk and the test termination time are specified. The proposed sampling plan is compared with the existing sampling plan. It is concluded that the proposed sampling plan performs better than the existing plan in terms of minimum sample size required to reach the same decision.

  19. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2018-03-01

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR

  20. 42 CFR 431.814 - Sampling plan and procedures.

    Science.gov (United States)

    2010-10-01

    ... reliability of the reduced sample. (4) The sample selection procedure. Systematic random sampling is... sampling, and yield estimates with the same or better precision than achieved in systematic random sampling... 42 Public Health 4 2010-10-01 2010-10-01 false Sampling plan and procedures. 431.814 Section 431...

  1. UMTRA project water sampling and analysis plan, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for water sampling activities for calendar year 1994. A buffer zone monitoring plan is included as an appendix. The buffer zone monitoring plan is designed to protect the public from residual contamination that entered the ground water as a result of former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually in 1994 at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted at least semiannually during and one year following the period of construction activities, to comply with the ground water protection strategy discussed in the remedial action plan (DOE, 1992a)

  2. International Journal of Development and Policy Studies - Vol 2, No ...

    African Journals Online (AJOL)

    International Journal of Development and Policy Studies - Vol 2, No 1 (2006) .... Locating oppressive use of language: a study of linguistic violence on nigerian ... trafficking - poverty link based on urban development and planning process ...

  3. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  4. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  5. Nr 257 - Opinion presented on the behalf of the Commission of sustainable development and land planning on the finance bill for 2013 (nr 235), Volumes 1-10, ecology, sustainable development and planning, regional policies, research and higher education

    International Nuclear Information System (INIS)

    Krabal, Jacques; Sermier, Jean-Marie; Gaillard, Genevieve; Baupin, Denis; Pauvros, Remi; Benisti, Jacques Alain; Fromantin, Jean-Christophe; Calmette, Alain; Plisson, Philippe; Ginesy, Charles-Ange

    2012-01-01

    This huge document comprises ten volumes which present and discuss public programs (objectives, strategies, plans, and actions), public finances, economic activity data and evolutions, debates by commissions, and amendments on different issues. A first set of issues deals with ecology, sustainable development and planning: protection of the environment and risk prevention (volume 1), and then with sustainable development policies (vol. 2), landscapes, water, biodiversity, and geographic and cartographic information (vol. 3), ecological transition (vol. 4), road, railway and water transports (vol. 5), air transports (vol. 6), maritime affairs (vol. 7). The next volume addresses regional policies (vol. 8). The last parts concern research and higher education: research in the field of sustainable development (vol. 9) and in the fields of environments and resources (vol. 10)

  6. Feasible sampling plan for Bemisia tabaci control decision-making in watermelon fields.

    Science.gov (United States)

    Lima, Carlos Ho; Sarmento, Renato A; Pereira, Poliana S; Galdino, Tarcísio Vs; Santos, Fábio A; Silva, Joedna; Picanço, Marcelo C

    2017-11-01

    The silverleaf whitefly Bemisia tabaci is one of the most important pests of watermelon fields worldwide. Conventional sampling plans are the starting point for the generation of decision-making systems of integrated pest management programs. The aim of this study was to determine a conventional sampling plan for B. tabaci in watermelon fields. The optimal leaf for B. tabaci adult sampling was the 6 th most apical leaf. Direct counting was the best pest sampling technique. Crop pest densities fitted the negative binomial distribution and had a common aggregation parameter (K common ). The sampling plan consisted of evaluating 103 samples per plot. This sampling plan was conducted for 56 min, costing US$ 2.22 per sampling and with a 10% maximum evaluation error. The sampling plan determined in this study can be adopted by farmers because it enables the adequate evaluation of B. tabaci populations in watermelon fields (10% maximum evaluation error) and is a low-cost (US$ 2.22 per sampling), fast (56 min per sampling) and feasible (because it may be used in a standardized way throughout the crop cycle) technique. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  7. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  8. Hydrogeologic investigations sampling plan: Revision 0

    International Nuclear Information System (INIS)

    1988-11-01

    The goal of this sampling plan is to identify and develop specific plans for those investigative actions necessary to: (1) characterize the hydrologic regime; (2) define the extent and impact of contamination; and (3) predict future contaminant migration for the Weldon Spring Site (WSS) and vicinity. The plan is part of the Weldon Spring Site Remedial Action Project (WSSRAP) sponsored by the US Department of Energy (DOE) and has been developed in accordance with US EPA Remedial Investigation (RI) and Data Quality Objective (DQO) guidelines. The plan consists of a sequence of activities including the evaluation of data, development of a conceptual model, identification of data uses and needs, and the design and implementation of a data collection program. Data will be obtained to: (1) confirm the presence or absence of contaminants; (2) define contaminant sources and modes of transport; (3) delineate extent of contaminant migration and predict future migration; and (4) provide information to support the evaluation and selection of remedial actions. 81 refs., 62 figs., 26 tabs

  9. UMTRA project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)

  10. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  11. The Toggle Local Planner for sampling-based motion planning

    KAUST Repository

    Denny, Jory; Amato, Nancy M.

    2012-01-01

    Sampling-based solutions to the motion planning problem, such as the probabilistic roadmap method (PRM), have become commonplace in robotics applications. These solutions are the norm as the dimensionality of the planning space grows, i.e., d > 5

  12. UMTRA Project water sampling and analysis plan, Gunnison, Colorado: Revision 1

    International Nuclear Information System (INIS)

    1994-11-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for future water sampling activities, in accordance with the Guidance Document for Preparing Sampling and Analysis Plans for UMTRA Sites. A buffer zone monitoring plan for the Dos Rios Subdivision is included as an appendix. The buffer zone monitoring plan was developed to ensure continued protection to the public from residual contamination. The buffer zone is beyond the area depicted as contaminated ground water due to former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually at the Gunnison processing site and disposal site. Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation

  13. Sample collection and sample analysis plan in support of the 105-C/190-C concrete and soil sampling activities

    International Nuclear Information System (INIS)

    Marske, S.G.

    1996-07-01

    This sampling and analysis plan describes the sample collection and sample analysis in support of the 105-C water tunnels and 190-C main pumphouse concrete and soil sampling activities. These analytical data will be used to identify the radiological contamination and presence of hazardous materials to support the decontamination and disposal activities

  14. UMTRA water sampling and analysis plan, Green River, Utah

    International Nuclear Information System (INIS)

    Papusch, R.

    1993-12-01

    The purpose of this water sampling and analysis plan (WSAP) is to provide a basis for groundwater and surface water sampling at the Green River Uranium Mill Tailing Remedial Action (UMTRA) Project site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations

  15. Compatibility Grab Sampling and Analysis Plan for Fiscal Year 2001

    International Nuclear Information System (INIS)

    LAURICELLA, T.L.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility

  16. Nitrate Waste Treatment Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Martinez, Patrick Thomas [Los Alamos National Laboratory; Garcia, Terrence Kerwin [Los Alamos National Laboratory

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  17. Sampling plans for pest mites on physic nut.

    Science.gov (United States)

    Rosado, Jander F; Sarmento, Renato A; Pedro-Neto, Marçal; Galdino, Tarcísio V S; Marques, Renata V; Erasmo, Eduardo A L; Picanço, Marcelo C

    2014-08-01

    The starting point for generating a pest control decision-making system is a conventional sampling plan. Because the mites Polyphagotarsonemus latus and Tetranychus bastosi are among the most important pests of the physic nut (Jatropha curcas), in the present study, we aimed to establish sampling plans for these mite species on physic nut. Mite densities were monitored in 12 physic nut crops. Based on the obtained results, sampling of P. latus and T. bastosi should be performed by assessing the number of mites per cm(2) in 160 samples using a handheld 20× magnifying glass. The optimal sampling region for T. bastosi is the abaxial surface of the 4th most apical leaf on the branch of the middle third of the canopy. On the abaxial surface, T. bastosi should then be observed on the side parts of the middle portion of the leaf, near its edge. As for P. latus, the optimal sampling region is the abaxial surface of the 4th most apical leaf on the branch of the apical third of the canopy on the abaxial surface. Polyphagotarsonemus latus should then be assessed on the side parts of the leaf's petiole insertion. Each sampling procedure requires 4 h and costs US$ 7.31.

  18. Using Load Balancing to Scalably Parallelize Sampling-Based Motion Planning Algorithms

    KAUST Repository

    Fidel, Adam; Jacobs, Sam Ade; Sharma, Shishir; Amato, Nancy M.; Rauchwerger, Lawrence

    2014-01-01

    Motion planning, which is the problem of computing feasible paths in an environment for a movable object, has applications in many domains ranging from robotics, to intelligent CAD, to protein folding. The best methods for solving this PSPACE-hard problem are so-called sampling-based planners. Recent work introduced uniform spatial subdivision techniques for parallelizing sampling-based motion planning algorithms that scaled well. However, such methods are prone to load imbalance, as planning time depends on region characteristics and, for most problems, the heterogeneity of the sub problems increases as the number of processors increases. In this work, we introduce two techniques to address load imbalance in the parallelization of sampling-based motion planning algorithms: an adaptive work stealing approach and bulk-synchronous redistribution. We show that applying these techniques to representatives of the two major classes of parallel sampling-based motion planning algorithms, probabilistic roadmaps and rapidly-exploring random trees, results in a more scalable and load-balanced computation on more than 3,000 cores. © 2014 IEEE.

  19. Using Load Balancing to Scalably Parallelize Sampling-Based Motion Planning Algorithms

    KAUST Repository

    Fidel, Adam

    2014-05-01

    Motion planning, which is the problem of computing feasible paths in an environment for a movable object, has applications in many domains ranging from robotics, to intelligent CAD, to protein folding. The best methods for solving this PSPACE-hard problem are so-called sampling-based planners. Recent work introduced uniform spatial subdivision techniques for parallelizing sampling-based motion planning algorithms that scaled well. However, such methods are prone to load imbalance, as planning time depends on region characteristics and, for most problems, the heterogeneity of the sub problems increases as the number of processors increases. In this work, we introduce two techniques to address load imbalance in the parallelization of sampling-based motion planning algorithms: an adaptive work stealing approach and bulk-synchronous redistribution. We show that applying these techniques to representatives of the two major classes of parallel sampling-based motion planning algorithms, probabilistic roadmaps and rapidly-exploring random trees, results in a more scalable and load-balanced computation on more than 3,000 cores. © 2014 IEEE.

  20. Economic Design of Acceptance Sampling Plans in a Two-Stage Supply Chain

    Directory of Open Access Journals (Sweden)

    Lie-Fern Hsu

    2012-01-01

    Full Text Available Supply Chain Management, which is concerned with material and information flows between facilities and the final customers, has been considered the most popular operations strategy for improving organizational competitiveness nowadays. With the advanced development of computer technology, it is getting easier to derive an acceptance sampling plan satisfying both the producer's and consumer's quality and risk requirements. However, all the available QC tables and computer software determine the sampling plan on a noneconomic basis. In this paper, we design an economic model to determine the optimal sampling plan in a two-stage supply chain that minimizes the producer's and the consumer's total quality cost while satisfying both the producer's and consumer's quality and risk requirements. Numerical examples show that the optimal sampling plan is quite sensitive to the producer's product quality. The product's inspection, internal failure, and postsale failure costs also have an effect on the optimal sampling plan.

  1. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site

  2. Tank 241-BY-105 rotary core sampling and analysis plan

    International Nuclear Information System (INIS)

    Sasaki, L.M.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two rotary-mode core samples from tank 241-BY-105 (BY-105)

  3. 105-DR Large Sodium Fire Facility decontamination, sampling, and analysis plan

    International Nuclear Information System (INIS)

    Knaus, Z.C.

    1995-01-01

    This is the decontamination, sampling, and analysis plan for the closure activities at the 105-DR Large Sodium Fire Facility at Hanford Reservation. This document supports the 105-DR Large Sodium Fire Facility Closure Plan, DOE-RL-90-25. The 105-DR LSFF, which operated from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility in the 100-D Area of the Hanford Site. The LSFF was established to investigate fire fighting and safety associated with alkali metal fires in the liquid metal fast breeder reactor facilities. The decontamination, sampling, and analysis plan identifies the decontamination procedures, sampling locations, any special handling requirements, quality control samples, required chemical analysis, and data validation needed to meet the requirements of the 105-DR Large Sodium Fire Facility Closure Plan in compliance with the Resource Conservation and Recovery Act

  4. Vol draadwerk

    African Journals Online (AJOL)

    Owner

    Die motto van Marius Crous se derde bundel,. Vol draadwerk (2012) is ontleen aan die vader van die psigoanalise, Sigmund Freud, wat lui: “Everywhere I go I find a poet has been there before me.” Vol draadwerk verskyn ses jaar ná sy vorige bundel, Aan 'n beentjie sit en kluif. (2006). Vir sy bundel, Brief uit die kolonies ...

  5. Reachable Distance Space: Efficient Sampling-Based Planning for Spatially Constrained Systems

    KAUST Repository

    Xinyu Tang,

    2010-01-25

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end-effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the number of the robot\\'s degrees of freedom. In addition to supporting efficient sampling of configurations, we show that the RD-space formulation naturally supports planning and, in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end-effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1,000 links in time comparable to open chain sampling, and we can generate samples for 1,000-link multi-loop systems of varying topologies in less than a second. © 2010 The Author(s).

  6. Sampling plans in attribute mode with multiple levels of precision

    International Nuclear Information System (INIS)

    Franklin, M.

    1986-01-01

    This paper describes a method for deriving sampling plans for nuclear material inventory verification. The method presented is different from the classical approach which envisages two levels of measurement precision corresponding to NDA and DA. In the classical approach the precisions of the two measurement methods are taken as fixed parameters. The new approach is based on multiple levels of measurement precision. The design of the sampling plan consists of choosing the number of measurement levels, the measurement precision to be used at each level and the sample size to be used at each level

  7. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years

  8. Sampling and Analysis Plan for PUREX canyon vessel flushing

    International Nuclear Information System (INIS)

    Villalobos, C.N.

    1995-01-01

    A sampling and analysis plan is necessary to provide direction for the sampling and analytical activities determined by the data quality objectives. This document defines the sampling and analysis necessary to support the deactivation of the Plutonium-Uranium Extraction (PUREX) facility vessels that are regulated pursuant to Washington Administrative Code 173-303

  9. UMTRA water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to provide background, guidance, and justification for fiscal year (FY) 1994 water sampling activities for the uranium mil tailings site at Tuba City, Arizona. This sampling and analysis plan will form the basis for groundwater sampling and analysis work orders to be implemented in FY94

  10. Visual Sample Plan (VSP) Software: Designs and Data Analyses for Sampling Contaminated Buildings

    International Nuclear Information System (INIS)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Nuffer, Lisa L.; Hassig, Nancy L.

    2005-01-01

    A new module of the Visual Sample Plan (VSP) software has been developed to provide sampling designs and data analyses for potentially contaminated buildings. An important application is assessing levels of contamination in buildings after a terrorist attack. This new module, funded by DHS through the Combating Terrorism Technology Support Office, Technical Support Working Group, was developed to provide a tailored, user-friendly and visually-orientated buildings module within the existing VSP software toolkit, the latest version of which can be downloaded from http://dqo.pnl.gov/vsp. In case of, or when planning against, a chemical, biological, or radionuclide release within a building, the VSP module can be used to quickly and easily develop and visualize technically defensible sampling schemes for walls, floors, ceilings, and other surfaces to statistically determine if contamination is present, its magnitude and extent throughout the building and if decontamination has been effective. This paper demonstrates the features of this new VSP buildings module, which include: the ability to import building floor plans or to easily draw, manipulate, and view rooms in several ways; being able to insert doors, windows and annotations into a room; 3-D graphic room views with surfaces labeled and floor plans that show building zones that have separate air handing units. The paper will also discuss the statistical design and data analysis options available in the buildings module. Design objectives supported include comparing an average to a threshold when the data distribution is normal or unknown, and comparing measurements to a threshold to detect hotspots or to insure most of the area is uncontaminated when the data distribution is normal or unknown

  11. Nonradioactive Dangerous Waste Landfill sampling and analysis plan and data quality objectives process summary report

    International Nuclear Information System (INIS)

    Smith, R.C.

    1997-08-01

    This sampling and analysis plan defines the sampling and analytical activities and associated procedures that will be used to support the Nonradioactive Dangerous Waste Landfill soil-gas investigation. This SAP consists of three sections: this introduction, the field sampling plan, and the quality assurance project plan. The field sampling plan defines the sampling and analytical methodologies to be performed

  12. Wind tunnel evaluation of Hi-Vol TSP effectiveness data

    Data.gov (United States)

    U.S. Environmental Protection Agency — Wind tunnel evaluation of EPA's Hi-Vol TSP sampler for sampling effectiveness with regards to aerodynamic particle diameter (5 to 35 microns), wind speed (2, 8, 24...

  13. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  14. 105-N Basin sediment disposition phase-one sampling and analysis plan

    International Nuclear Information System (INIS)

    1997-01-01

    The sampling and analysis plan (SAP) for Phase 1 of the 105-N Basin sediment disposition project defines the sampling and analytical activities that will be performed for the engineering assessment phase (phase 1) of the project. A separate SAP defines the sampling and analytical activities that will be performed for the characterization phase (Phase 2) of the 105-N sediment disposition project. The Phase-1 SAP is presented in the introduction (Section 1.0), in the field sampling plan (FSP) (Section 2.0), and in the quality assurance project plan (QAPjP) (Section 3.0). The FSP defines the sampling and analytical methodologies to be performed. The QAPjP provides information on the quality assurance/quality control (QA/QC) parameters related to the sampling and analytical methodologies. This SAP defines the strategy and the methods that will be used to sample and analyze the sediment on the floor of the 105-N Basin. The resulting data will be used to develop and evaluate engineering designs for collecting and removing sediment from the basin

  15. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  16. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  17. Sampling and Analysis Plan for the 233-S Plutonium Concentration Facility

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    This Sampling and Analysis Plan (SAP) provides the information and instructions to be used for sampling and analysis activities in the 233-S Plutonium Concentration Facility. The information and instructions herein are separated into three parts and address the Data Quality Objective (DQO) Summary Report, Quality Assurance Project Plan (QAP), and SAP

  18. Tank 241-AP-104 Grab Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AP-104. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AP-104 required to provide sample material to the Waste Treatment Contractor. Grab samples will be obtained from riser 001 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives and ICD-23. The 222-S Laboratory will receive samples; composite the samples; perform chemical analyses on composite samples; and provide samples to the Waste Treatment Contractor and the Process Chemistry Laboratory. The Process Chemistry Laboratory at the 222-S Laboratory Complex will perform process tests to evaluate the behavior of the 241-AP-104 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. The Waste Treatment Contractor will perform process verification and waste form qualification tests. Requirements for analyses of samples originating in the L and H DQO process tests will be documented in the corresponding test plan (Person 2000) and are not within the scope of this SAP. This report provides the general methodology and procedures to be used in the preparation, retrieval, transport, analysis, and reporting of results from grab samples retrieved from tank 241-AP-104

  19. Planning and Problem Solving

    Science.gov (United States)

    1982-10-01

    Artificial Intelig ~ence (Vol. III, edited by Paul R. Cohen and’ Edward A.. Feigenbaum)’, The chapter was written B’ Paul Cohen, with contributions... Artificial Intelligence (Vol. III, edited by Paul R. Cohen and EdWard A. Feigenbaum). The chapter was written by Paul R. Cohen, with contributions by Stephen...Wheevoats"EntermdI’ Planning and Problem ’Solving by Paul R. Cohen Chaptb-rXV-of Volumec III’of the Handbook of Artificial Intelligence edited by Paul R

  20. Energy-Aware Path Planning for UAS Persistent Sampling and Surveillance

    Science.gov (United States)

    Shaw-Cortez, Wenceslao

    The focus of this work is to develop an energy-aware path planning algorithm that maximizes UAS endurance, while performing sampling and surveillance missions in a known, stationary wind environment. The energy-aware aspect is specifically tailored to extract energy from the wind to reduce thrust use, thereby increasing aircraft endurance. Wind energy extraction is performed by static soaring and dynamic soaring. Static soaring involves using upward wind currents to increase altitude and potential energy. Dynamic soaring involves taking advantage of wind gradients to exchange potential and kinetic energy. The path planning algorithm developed in this work uses optimization to combine these soaring trajectories with the overarching sampling and surveillance mission. The path planning algorithm uses a simplified aircraft model to tractably optimize soaring trajectories. This aircraft model is presented and along with the derivation of the equations of motion. A nonlinear program is used to create the soaring trajectories based on a given optimization problem. This optimization problem is defined using a heuristic decision tree, which defines appropriate problems given a sampling and surveillance mission and a wind model. Simulations are performed to assess the path planning algorithm. The results are used to identify properties of soaring trajectories as well as to determine what wind conditions support minimal thrust soaring. Additional results show how the path planning algorithm can be tuned between maximizing aircraft endurance and performing the sampling and surveillance mission. A means of trajectory stitching is demonstrated to show how the periodic soaring segments can be combined together to provide a full solution to an infinite/long horizon problem.

  1. Test plan for core sampling drill bit temperature monitor

    International Nuclear Information System (INIS)

    Francis, P.M.

    1994-01-01

    At WHC, one of the functions of the Tank Waste Remediation System division is sampling waste tanks to characterize their contents. The push-mode core sampling truck is currently used to take samples of liquid and sludge. Sampling of tanks containing hard salt cake is to be performed with the rotary-mode core sampling system, consisting of the core sample truck, mobile exhauster unit, and ancillary subsystems. When drilling through the salt cake material, friction and heat can be generated in the drill bit. Based upon tank safety reviews, it has been determined that the drill bit temperature must not exceed 180 C, due to the potential reactivity of tank contents at this temperature. Consequently, a drill bit temperature limit of 150 C was established for operation of the core sample truck to have an adequate margin of safety. Unpredictable factors, such as localized heating, cause this buffer to be so great. The most desirable safeguard against exceeding this threshold is bit temperature monitoring . This document describes the recommended plan for testing the prototype of a drill bit temperature monitor developed for core sampling by Sandia National Labs. The device will be tested at their facilities. This test plan documents the tests that Westinghouse Hanford Company considers necessary for effective testing of the system

  2. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  3. Tank 241-U-105 push mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    Bell, K.E.

    1995-01-01

    This Sampling and Analysis Plan (SAP) will identify characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples and two push mode core samples from tank 241-U-105 (U-105)

  4. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  5. Evaluation of sampling plans for in-service inspection of steam generator tubes

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Heasler, P.G.; Baird, D.B.

    1994-02-01

    This report summarizes the results of three previous studies to evaluate and compare the effectiveness of sampling plans for steam generator tube inspections. An analytical evaluation and Monte Carlo simulation techniques were the methods used to evaluate sampling plan performance. To test the performance of candidate sampling plans under a variety of conditions, ranges of inspection system reliability were considered along with different distributions of tube degradation. Results from the eddy current reliability studies performed with the retired-from-service Surry 2A steam generator were utilized to guide the selection of appropriate probability of detection and flaw sizing models for use in the analysis. Different distributions of tube degradation were selected to span the range of conditions that might exist in operating steam generators. The principal means of evaluating sampling performance was to determine the effectiveness of the sampling plan for detecting and plugging defective tubes. A summary of key results from the eddy current reliability studies is presented. The analytical and Monte Carlo simulation analyses are discussed along with a synopsis of key results and conclusions

  6. Sampling and Analysis Plan for the 221-U Facility

    International Nuclear Information System (INIS)

    Rugg, J.E.

    1998-02-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed to be conducted to support the evaluation of alternatives for the final disposition of the 221-U Facility. This SAP will describe general sample locations and the minimum number of samples required. It will also identify the specific contaminants of potential concern (COPCs) and the required analysis. This SAP does not define the exact sample locations and equipment to be used in the field due to the nature of unknowns associated with the 221-U Facility

  7. Acceptance Sampling Plans Based on Truncated Life Tests for Sushila Distribution

    Directory of Open Access Journals (Sweden)

    Amer Ibrahim Al-Omari

    2018-03-01

    Full Text Available An acceptance sampling plan problem based on truncated life tests when the lifetime following a Sushila distribution is considered in this paper. For various acceptance numbers, confidence levels and values of the ratio between fixed experiment time and particular mean lifetime, the minimum sample sizes required to ascertain a specified mean life were found. The operating characteristic function values of the suggested sampling plans and the producer’s risk are presented. Some tables are provided and the results are illustrated by an example of a real data set.

  8. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  9. In situ sampling cart development engineering task plan

    International Nuclear Information System (INIS)

    DeFord, D.K.

    1995-01-01

    This Engineering Task Plan (ETP) supports the development for facility use of the next generation in situ sampling system for characterization of tank vapors. In situ sampling refers to placing sample collection devices (primarily sorbent tubes) directly into the tank headspace, then drawing tank gases through the collection devices to obtain samples. The current in situ sampling system is functional but was not designed to provide the accurate flow measurement required by today's data quality objectives (DQOs) for vapor characterization. The new system will incorporate modern instrumentation to achieve much tighter control. The next generation system will be referred to in this ETP as the New In Situ System (NISS) or New System. The report describes the current sampling system and the modifications that are required for more accuracy

  10. Sampling Plans for the Thrips Frankliniella schultzei (Thysanoptera: Thripidae) in Three Lettuce Varieties.

    Science.gov (United States)

    Silva, Alisson R; Rodrigues-Silva, Nilson; Pereira, Poliana S; Sarmento, Renato A; Costa, Thiago L; Galdino, Tarcísio V S; Picanço, Marcelo C

    2017-12-05

    The common blossom thrips, Frankliniella schultzei Trybom (Thysanoptera: Thripidae), is an important lettuce pest worldwide. Conventional sampling plans are the first step in implementing decision-making systems into integrated pest management programs. However, this tool is not available for F. schultzei infesting lettuce crops. Thus, the objective of this work was to develop a conventional sampling plan for F. schultzei in lettuce crops. Two sampling techniques (direct counting and leaf beating on a white plastic tray) were compared in crisphead, looseleaf, and Boston lettuce varieties before and during head formation. The frequency distributions of F. schultzei densities in lettuce crops were assessed, and the number of samples required to compose the sampling plan was determined. Leaf beating on a white plastic tray was the best sampling technique. F. schultzei densities obtained with this technique were fitted to the negative binomial distribution with a common aggregation parameter (common K = 0.3143). The developed sampling plan is composed of 91 samples per field and presents low errors in its estimates (up to 20%), fast execution time (up to 47 min), and low cost (up to US $1.67 per sampling area). This sampling plan can be used as a tool for integrated pest management in lettuce crops, assisting with reliable decision making in different lettuce varieties before and during head formation. © The Author(s) 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  11. Group SkSP-R sampling plan for accelerated life tests

    Indian Academy of Sciences (India)

    Muhammad Aslam

    2017-09-15

    Sep 15, 2017 ... SkSP-R sampling; life test; Weibull distribution; producer's risk; ... designed a sampling plan under a time-truncated life test .... adjusted using an acceleration factor. ... where P is the probability of lot acceptance for a single.

  12. Designing a two-rank acceptance sampling plan for quality inspection of geospatial data products

    Science.gov (United States)

    Tong, Xiaohua; Wang, Zhenhua; Xie, Huan; Liang, Dan; Jiang, Zuoqin; Li, Jinchao; Li, Jun

    2011-10-01

    To address the disadvantages of classical sampling plans designed for traditional industrial products, we originally propose a two-rank acceptance sampling plan (TRASP) for the inspection of geospatial data outputs based on the acceptance quality level (AQL). The first rank sampling plan is to inspect the lot consisting of map sheets, and the second is to inspect the lot consisting of features in an individual map sheet. The TRASP design is formulated as an optimization problem with respect to sample size and acceptance number, which covers two lot size cases. The first case is for a small lot size with nonconformities being modeled by a hypergeometric distribution function, and the second is for a larger lot size with nonconformities being modeled by a Poisson distribution function. The proposed TRASP is illustrated through two empirical case studies. Our analysis demonstrates that: (1) the proposed TRASP provides a general approach for quality inspection of geospatial data outputs consisting of non-uniform items and (2) the proposed acceptance sampling plan based on TRASP performs better than other classical sampling plans. It overcomes the drawbacks of percent sampling, i.e., "strictness for large lot size, toleration for small lot size," and those of a national standard used specifically for industrial outputs, i.e., "lots with different sizes corresponding to the same sampling plan."

  13. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    Science.gov (United States)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  14. Sampling plan to support HLW tank 16

    International Nuclear Information System (INIS)

    Rodwell, P.O.; Martin, B.

    1997-01-01

    Plans are to remove the residual waste from the annulus of High-Level Waste Tank 16, located in the H-Area Tank Farm, in 1998. The interior of the tank is virtually clean. In the late 1970's, the waste was removed from the interior of the tank by several campaigns of waste removal with slurry pumps, spray washing, and oxalic acid cleaning. The annulus of the tank at one time had several thousand gallons of waste salt, which had leaked from the tank interior. Some of this salt was removed by adding water to the annulus and circulating, but much of the salt remains in the annulus. In order to confirm the source term used for fate and transport modeling, samples of the tank interior and annulus will be obtained and analyzed. If the results of the analyses indicate that the data used for the initial modeling is bounding then no changes will be made to the model. However, if the results indicate that the source term is higher than that assumed in the initial modeling, thus not bounding, additional modeling will be performed. The purpose of this Plan is to outline the approach to sampling the annulus and interior of Tank 16 as a prerequisite to salt removal in the annulus and closure of the entire tank system. The sampling and analysis of this tank system must be robust to reasonably ensure the actual tank residual is within the bounds of analysis error

  15. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102

  16. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102

  17. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  18. IP Sample Plan #5 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    A sample Intellectual Property Management Plan in the form of a legal agreement between a University and its collaborators which addresses data sharing, sharing of research tools and resources and intellectual property management.

  19. Test plan for evaluating the performance of the in-tank fluidic sampling system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization contractor from double-shell feed tanks, 241-AP-102 and 241-AP-104, Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a conceptual sampling system that would be deployed in a feed tank riser, This sampling system will provide large volume, representative samples without the environmental, radiation exposure, and sample volume impacts of the current base-line ''grab'' sampling method. This test plan identifies ''proof-of-principle'' cold tests for the conceptual sampling system using simulant materials. The need for additional testing was identified as a result of completing tests described in the revision test plan document, Revision 1 outlines tests that will evaluate the performance and ability to provide samples that are representative of a tanks' content within a 95 percent confidence interval, to recovery from plugging, to sample supernatant wastes with over 25 wt% solids content, and to evaluate the impact of sampling at different heights within the feed tank. The test plan also identifies operating parameters that will optimize the performance of the sampling system

  20. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan; FINAL

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan

  1. Soil Sampling Plan for the transuranic storage area soil overburden and final report: Soil overburden sampling at the RWMC transuranic storage area

    International Nuclear Information System (INIS)

    Stanisich, S.N.

    1994-12-01

    This Soil Sampling Plan (SSP) has been developed to provide detailed procedural guidance for field sampling and chemical and radionuclide analysis of selected areas of soil covering waste stored at the Transuranic Storage Area (TSA) at the Idaho National Engineering Laboratory's (INEL) Radioactive Waste Management Complex (RWMC). The format and content of this SSP represents a complimentary hybrid of INEL Waste Management--Environmental Restoration Program, and Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) sampling guidance documentation. This sampling plan also functions as a Quality Assurance Project Plan (QAPP). The QAPP as a controlling mechanism during sampling to ensure that all data collected are valid, reliabile, and defensible. This document outlines organization, objectives and quality assurance/quality control (QA/QC) activities to achieve the desired data quality goals. The QA/QC requirements for this project are outlined in the Data Collection Quality Assurance Plan (DCQAP) for the Buried Waste Program. The DCQAP is a program plan and does not outline the site specific requirements for the scope of work covered by this SSP

  2. Spatial distribution and sequential sampling plans for Tuta absoluta (Lepidoptera: Gelechiidae) in greenhouse tomato crops.

    Science.gov (United States)

    Cocco, Arturo; Serra, Giuseppe; Lentini, Andrea; Deliperi, Salvatore; Delrio, Gavino

    2015-09-01

    The within- and between-plant distribution of the tomato leafminer, Tuta absoluta (Meyrick), was investigated in order to define action thresholds based on leaf infestation and to propose enumerative and binomial sequential sampling plans for pest management applications in protected crops. The pest spatial distribution was aggregated between plants, and median leaves were the most suitable sample to evaluate the pest density. Action thresholds of 36 and 48%, 43 and 56% and 60 and 73% infested leaves, corresponding to economic thresholds of 1 and 3% damaged fruits, were defined for tomato cultivars with big, medium and small fruits respectively. Green's method was a more suitable enumerative sampling plan as it required a lower sampling effort. Binomial sampling plans needed lower average sample sizes than enumerative plans to make a treatment decision, with probabilities of error of sampling plan required 87 or 343 leaves to estimate the population density in extensive or intensive ecological studies respectively. Binomial plans would be more practical and efficient for control purposes, needing average sample sizes of 17, 20 and 14 leaves to take a pest management decision in order to avoid fruit damage higher than 1% in cultivars with big, medium and small fruits respectively. © 2014 Society of Chemical Industry.

  3. Visual Sample Plan (VSP) - FIELDS Integration

    Energy Technology Data Exchange (ETDEWEB)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Hassig, Nancy L.; Carlson, Deborah K.; Bing-Canar, John; Cooper, Brian; Roth, Chuck

    2003-04-19

    Two software packages, VSP 2.1 and FIELDS 3.5, are being used by environmental scientists to plan the number and type of samples required to meet project objectives, display those samples on maps, query a database of past sample results, produce spatial models of the data, and analyze the data in order to arrive at defensible decisions. VSP 2.0 is an interactive tool to calculate optimal sample size and optimal sample location based on user goals, risk tolerance, and variability in the environment and in lab methods. FIELDS 3.0 is a set of tools to explore the sample results in a variety of ways to make defensible decisions with quantified levels of risk and uncertainty. However, FIELDS 3.0 has a small sample design module. VSP 2.0, on the other hand, has over 20 sampling goals, allowing the user to input site-specific assumptions such as non-normality of sample results, separate variability between field and laboratory measurements, make two-sample comparisons, perform confidence interval estimation, use sequential search sampling methods, and much more. Over 1,000 copies of VSP are in use today. FIELDS is used in nine of the ten U.S. EPA regions, by state regulatory agencies, and most recently by several international countries. Both software packages have been peer-reviewed, enjoy broad usage, and have been accepted by regulatory agencies as well as site project managers as key tools to help collect data and make environmental cleanup decisions. Recently, the two software packages were integrated, allowing the user to take advantage of the many design options of VSP, and the analysis and modeling options of FIELDS. The transition between the two is simple for the user – VSP can be called from within FIELDS, automatically passing a map to VSP and automatically retrieving sample locations and design information when the user returns to FIELDS. This paper will describe the integration, give a demonstration of the integrated package, and give users download

  4. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    International Nuclear Information System (INIS)

    2012-01-01

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  5. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  6. Sequential Sampling Plan of Anthonomus grandis (Coleoptera: Curculionidae) in Cotton Plants.

    Science.gov (United States)

    Grigolli, J F J; Souza, L A; Mota, T A; Fernandes, M G; Busoli, A C

    2017-04-01

    The boll weevil, Anthonomus grandis grandis Boheman (Coleoptera: Curculionidae), is one of the most important pests of cotton production worldwide. The objective of this work was to develop a sequential sampling plan for the boll weevil. The studies were conducted in Maracaju, MS, Brazil, in two seasons with cotton cultivar FM 993. A 10,000-m2 area of cotton was subdivided into 100 of 10- by 10-m plots, and five plants per plot were evaluated weekly, recording the number of squares with feeding + oviposition punctures of A. grandis in each plant. A sequential sampling plan by the maximum likelihood ratio test was developed, using a 10% threshold level of squares attacked. A 5% security level was adopted for the elaboration of the sequential sampling plan. The type I and type II error used was 0.05, recommended for studies with insects. The adjustment of the frequency distributions used were divided into two phases, so that the model that best fit to the data was the negative binomial distribution up to 85 DAE (Phase I), and from there the best fit was Poisson distribution (Phase II). The equations that define the decision-making for Phase I are S0 = -5.1743 + 0.5730N and S1 = 5.1743 + 0.5730N, and for the Phase II are S0 = -4.2479 + 0.5771N and S1 = 4.2479 + 0.5771N. The sequential sampling plan developed indicated the maximum number of sample units expected for decision-making is ∼39 and 31 samples for Phases I and II, respectively. © The Authors 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  7. A scalable method for parallelizing sampling-based motion planning algorithms

    KAUST Repository

    Jacobs, Sam Ade; Manavi, Kasra; Burgos, Juan; Denny, Jory; Thomas, Shawna; Amato, Nancy M.

    2012-01-01

    This paper describes a scalable method for parallelizing sampling-based motion planning algorithms. It subdivides configuration space (C-space) into (possibly overlapping) regions and independently, in parallel, uses standard (sequential) sampling-based planners to construct roadmaps in each region. Next, in parallel, regional roadmaps in adjacent regions are connected to form a global roadmap. By subdividing the space and restricting the locality of connection attempts, we reduce the work and inter-processor communication associated with nearest neighbor calculation, a critical bottleneck for scalability in existing parallel motion planning methods. We show that our method is general enough to handle a variety of planning schemes, including the widely used Probabilistic Roadmap (PRM) and Rapidly-exploring Random Trees (RRT) algorithms. We compare our approach to two other existing parallel algorithms and demonstrate that our approach achieves better and more scalable performance. Our approach achieves almost linear scalability on a 2400 core LINUX cluster and on a 153,216 core Cray XE6 petascale machine. © 2012 IEEE.

  8. A scalable method for parallelizing sampling-based motion planning algorithms

    KAUST Repository

    Jacobs, Sam Ade

    2012-05-01

    This paper describes a scalable method for parallelizing sampling-based motion planning algorithms. It subdivides configuration space (C-space) into (possibly overlapping) regions and independently, in parallel, uses standard (sequential) sampling-based planners to construct roadmaps in each region. Next, in parallel, regional roadmaps in adjacent regions are connected to form a global roadmap. By subdividing the space and restricting the locality of connection attempts, we reduce the work and inter-processor communication associated with nearest neighbor calculation, a critical bottleneck for scalability in existing parallel motion planning methods. We show that our method is general enough to handle a variety of planning schemes, including the widely used Probabilistic Roadmap (PRM) and Rapidly-exploring Random Trees (RRT) algorithms. We compare our approach to two other existing parallel algorithms and demonstrate that our approach achieves better and more scalable performance. Our approach achieves almost linear scalability on a 2400 core LINUX cluster and on a 153,216 core Cray XE6 petascale machine. © 2012 IEEE.

  9. Spatial Distribution and Sampling Plans for Grapevine Plant Canopy-Inhabiting Scaphoideus titanus (Hemiptera: Cicadellidae) Nymphs.

    Science.gov (United States)

    Rigamonti, Ivo E; Brambilla, Carla; Colleoni, Emanuele; Jermini, Mauro; Trivellone, Valeria; Baumgärtner, Johann

    2016-04-01

    The paper deals with the study of the spatial distribution and the design of sampling plans for estimating nymph densities of the grape leafhopper Scaphoideus titanus Ball in vine plant canopies. In a reference vineyard sampled for model parameterization, leaf samples were repeatedly taken according to a multistage, stratified, random sampling procedure, and data were subjected to an ANOVA. There were no significant differences in density neither among the strata within the vineyard nor between the two strata with basal and apical leaves. The significant differences between densities on trunk and productive shoots led to the adoption of two-stage (leaves and plants) and three-stage (leaves, shoots, and plants) sampling plans for trunk shoots- and productive shoots-inhabiting individuals, respectively. The mean crowding to mean relationship used to analyze the nymphs spatial distribution revealed aggregated distributions. In both the enumerative and the sequential enumerative sampling plans, the number of leaves of trunk shoots, and of leaves and shoots of productive shoots, was kept constant while the number of plants varied. In additional vineyards data were collected and used to test the applicability of the distribution model and the sampling plans. The tests confirmed the applicability 1) of the mean crowding to mean regression model on the plant and leaf stages for representing trunk shoot-inhabiting distributions, and on the plant, shoot, and leaf stages for productive shoot-inhabiting nymphs, 2) of the enumerative sampling plan, and 3) of the sequential enumerative sampling plan. In general, sequential enumerative sampling was more cost efficient than enumerative sampling.

  10. Sampling and Analysis Plan for K Basins Debris

    International Nuclear Information System (INIS)

    WESTCOTT, J.L.

    2000-01-01

    This Sampling and Analysis Plan presents the rationale and strategy for sampling and analysis activities to support removal of debris from the K-East and K-West Basins located in the 100K Area at the Hanford Site. This project is focused on characterization to support waste designation for disposal of waste at the Environmental Restoration Disposal Facility (ERDF). This material has previously been dispositioned at the Hanford Low-Level Burial Grounds or Central Waste Complex. The structures that house the basins are classified as radioactive material areas. Therefore, all materials removed from the buildings are presumed to be radioactively contaminated. Because most of the materials that will be addressed under this plan will be removed from the basins, and because of the cost associated with screening materials for release, it is anticipated that all debris will be managed as low-level waste. Materials will be surveyed, however, to estimate radionuclide content for disposal and to determine that the debris is not contaminated with levels of transuranic radionuclides that would designate the debris as transuranic waste

  11. Sampling and Analysis Plan for the 216-A-29 Ditch

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1998-06-01

    This sampling and analysis plan defines procedures to be used for collecting and handling samples to be obtained from the 216-A-29 Ditch, and identifies requirements for field and laboratory measurements. The sampling strategy describes here is derived from a Data Quality Objectives workshop conducted in January 1997 to support sampling to assure worker safety during construction and to assess the validity of a 1988 ditch sampling campaign and the effectiveness of subsequent stabilization. The purpose of the proposed sampling and analysis activities is to characterize soil contamination in the vicinity of a proposed road over the 216-A-29 Ditch

  12. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    International Nuclear Information System (INIS)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle's Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC)

  13. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    Energy Technology Data Exchange (ETDEWEB)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  14. IP Sample Plan #1 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample letter that shows how Universities including co-investigators, consultants, and collaborators can describe a data and research tool sharing plan and procedures for exercising intellectual property rights. The letter is to be used as part of the University's application. 

  15. Visual Sample Plan Version 7.0 User's Guide

    Energy Technology Data Exchange (ETDEWEB)

    Matzke, Brett D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Newburn, Lisa LN [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hathaway, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bramer, Lisa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilson, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dowson, Scott T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sego, Landon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pulsipher, Brent A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-03-01

    User's guide for VSP 7.0 This user's guide describes Visual Sample Plan (VSP) Version 7.0 and provides instructions for using the software. VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 7.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (XP, Vista, Windows 7, and Windows 8). Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem/rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for unexploded ordnance (UXO) identification.

  16. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  17. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    International Nuclear Information System (INIS)

    Lueck, K.J.

    1995-01-01

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs

  18. Planning Considerations Related to Collecting and Analyzing Samples of the Martian Soils

    Science.gov (United States)

    Liu, Yang; Mellon, Mike T.; Ming, Douglas W.; Morris, Richard V.; Noble, Sarah K.; Sullivan, Robert J.; Taylor, Lawrence A.; Beaty, David W.

    2014-01-01

    The Mars Sample Return (MSR) End-to-End International Science Analysis Group (E2E-iSAG [1]) established scientific objectives associ-ated with Mars returned-sample science that require the return and investigation of one or more soil samples. Soil is defined here as loose, unconsolidated materials with no implication for the presence or absence of or-ganic components. The proposed Mars 2020 (M-2020) rover is likely to collect and cache soil in addition to rock samples [2], which could be followed by future sample retrieval and return missions. Here we discuss key scientific consid-erations for sampling and caching soil samples on the proposed M-2020 rover, as well as the state in which samples would need to be preserved when received by analysts on Earth. We are seeking feedback on these draft plans as input to mission requirement formulation. A related planning exercise on rocks is reported in an accompanying abstract [3].

  19. IP Sample Plan #3 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample Research Resources and Intellectual Property Plan for use by an Institution and its Collaborators for intellectual property protection strategies covering pre-existing intellectual property, agreements with commercial sources, privacy, and licensing.  | [google6f4cd5334ac394ab.html

  20. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  1. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    International Nuclear Information System (INIS)

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary

  2. Corporate Data Network (CDN). Data Requirements Task. Preliminary Strategic Data Plan. Volume 4

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol.2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol.3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  3. IP Sample Plan #4 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample letter from Research Institutes and their principal investigator and consultants, describing a data and research tool sharing plan and procedures for sharing data, research materials, and patent and licensing of intellectual property. This letter is designed to be included as part of an application.

  4. Short-Run Contexts and Imperfect Testing for Continuous Sampling Plans

    Directory of Open Access Journals (Sweden)

    Mirella Rodriguez

    2018-04-01

    Full Text Available Continuous sampling plans are used to ensure a high level of quality for items produced in long-run contexts. The basic idea of these plans is to alternate between 100% inspection and a reduced rate of inspection frequency. Any inspected item that is found to be defective is replaced with a non-defective item. Because not all items are inspected, some defective items will escape to the customer. Analytical formulas have been developed that measure both the customer perceived quality and also the level of inspection effort. The analysis of continuous sampling plans does not apply to short-run contexts, where only a finite-size batch of items is to be produced. In this paper, a simulation algorithm is designed and implemented to analyze the customer perceived quality and the level of inspection effort for short-run contexts. A parameter representing the effectiveness of the test used during inspection is introduced to the analysis, and an analytical approximation is discussed. An application of the simulation algorithm that helped answer questions for the U.S. Navy is discussed.

  5. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  6. 105-F and DR Phase 1 Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    Curry, L.R.

    1998-06-01

    This SAP presents the rationale and strategy for characterization of specific rooms within the 105-F and 105-DR reactor buildings. Figures 1-1 and 1-2 identify the rooms that are the subject of this SAP. These rooms are to be decontaminated and demolished as an initial step (Phase 1 ) in the Interim Safe Storage process for these reactors. Section 1.0 presents the background and sites history for the reactor buildings and summarizes the data quality objective process, which provides the logical basis for this SAP. Preliminary surveys indicate that little radiochemical contamination is present. Section 2.0 presents the quality assurance project plan, which includes a project management structure, sampling methods and quality control, and oversight of the sampling process. Section 2.2.1 summarizes the sampling methods, reflecting the radiological and chemical sampling designs presented in Tables 1-17 and 1-18. Section 3.0 presents the Field Sampling Plan for Phase 1. The sampling design is broken into two stages. Stage 1 will verify the list of radioactive constituents of concern and generate the isotopic distribution. The objectives of Stage 2 are to estimate the radionuclide inventories of room debris, quantify chemical contamination, and survey room contents for potential salvage or recycle. Table 3-1 presents the sampling activities to be performed in Stage 1. Tables 1-17 and 1-18 identify samples to be collected in Stage 2. Stage 2 will consist primarily of survey data collection, with fixed laboratory samples to be collected in areas showing visible stains. Quality control sampling requirements are presented in Table 3-2

  7. Tank 241-B-203 push mode core sampling and analysis plan. Revision 1

    International Nuclear Information System (INIS)

    Jo, J.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two push-mode core samples from tank 241-B-203 (B-203)

  8. Tank 241-B-204 push mode core sampling and analysis plan. Revision 1

    International Nuclear Information System (INIS)

    Sasaki, L.M.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two push-mode core samples from tank 241-B-204 (B-204)

  9. Test plan for K Basin Sludge Canister and Floor Sampling Device

    International Nuclear Information System (INIS)

    Meling, T.A.

    1995-01-01

    This document provides the test plan and procedure forms for conducting the functional and operational acceptance testing of the K Basin Sludge Canister and Floor Sampling Device(s). These samplers samples sludge off the floor of the 100K Basins and out of 100K fuel storage canisters

  10. Efficient sampling algorithms for Monte Carlo based treatment planning

    International Nuclear Information System (INIS)

    DeMarco, J.J.; Solberg, T.D.; Chetty, I.; Smathers, J.B.

    1998-01-01

    Efficient sampling algorithms are necessary for producing a fast Monte Carlo based treatment planning code. This study evaluates several aspects of a photon-based tracking scheme and the effect of optimal sampling algorithms on the efficiency of the code. Four areas were tested: pseudo-random number generation, generalized sampling of a discrete distribution, sampling from the exponential distribution, and delta scattering as applied to photon transport through a heterogeneous simulation geometry. Generalized sampling of a discrete distribution using the cutpoint method can produce speedup gains of one order of magnitude versus conventional sequential sampling. Photon transport modifications based upon the delta scattering method were implemented and compared with a conventional boundary and collision checking algorithm. The delta scattering algorithm is faster by a factor of six versus the conventional algorithm for a boundary size of 5 mm within a heterogeneous geometry. A comparison of portable pseudo-random number algorithms and exponential sampling techniques is also discussed

  11. Tank 241-TX-113 rotary mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    McCain, D.J.

    1998-01-01

    This sampling and analysis plan (SAP) identities characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for push mode core samples from tank 241-TX-113 (TX-113). The Tank Characterization Technical Sampling Basis document identities Retrieval, Pretreatment and Immobilization as an issue that applies to tank TX-113. As a result, a 150 gram composite of solids shall be made and archived for that program. This tank is not on a Watch List

  12. Case Study: Does training of private networks of Family Planning clinicians in urban Pakistan affect service utilization?

    OpenAIRE

    Qureshi, Asma M

    2010-01-01

    Abstract Background To determine whether training of providers participating in franchise clinic networks is associated with increased Family Planning service use among low-income urban families in Pakistan. Methods The study uses 2001 survey data consisting of interviews with 1113 clinical and non-clinical providers working in public and private hospitals/clinics. Data analysis excludes non-clinical providers reducing sample size to 822. Variables for the analysis are divided into client vol...

  13. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  14. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy ''Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO)' (Nguyen 1999a), ''Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Butch X (LAW DQO) (Nguyen 1999b)'', ''Low Activity Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO)'' (Patello et al. 1999), and ''Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO)'' (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide sub-samples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP

  15. Generalized procedures for determining inspection sample sizes (related to quantitative measurements). Vol. 1: Detailed explanations

    International Nuclear Information System (INIS)

    Jaech, J.L.; Lemaire, R.J.

    1986-11-01

    Generalized procedures have been developed to determine sample sizes in connection with the planning of inspection activities. These procedures are based on different measurement methods. They are applied mainly to Bulk Handling Facilities and Physical Inventory Verifications. The present report attempts (i) to assign to appropriate statistical testers (viz. testers for gross, partial and small defects) the measurement methods to be used, and (ii) to associate the measurement uncertainties with the sample sizes required for verification. Working papers are also provided to assist in the application of the procedures. This volume contains the detailed explanations concerning the above mentioned procedures

  16. STECH VOL5 (1) FEBRUARY, 2016

    African Journals Online (AJOL)

    Copyright 1AARR 2012-2016: www.afrrevjo.net

    STECH VOL 5 (1) FEBRUARY, 2016. Vol. 5 (1), S/No11, February, 2016: 1-13 ..... Knowledge produce is an act of discovery which involves exploring, analyzing .... Architectural Research, Elsevier: Higher Education Press Limited Company.

  17. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  18. Town and Regional Planning - Vol 60 (2012)

    African Journals Online (AJOL)

    Mainstreaming informality and access to land through collaborative design and teaching of aspects of a responsive planning curriculum at the Cape Peninsula University of Technology · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. N Tapela, 10-18 ...

  19. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999), and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP

  20. Chain sampling plan (ChSP-1) for desired acceptable quality level (AQL) and limiting quality level (LQL)

    Science.gov (United States)

    Raju, C.; Vidya, R.

    2017-11-01

    Chain Sampling Plan is widely used whenever a small sample attributes plan is required to be used for situations involving destructive products coming out of continuous production process [1, 2]. This paper presents a procedure for the construction and selection of a ChSP-1 by attributes inspection based on membership functions [3]. A procedure using search technique is developed for obtaining the parameters of single sampling plan for a given set of AQL and LQL values. A sample of tables providing ChSP-1 plans for various combinations of AQL and LQL values are presented [4].

  1. Supplement to the UMTRA Project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Mexican Hat (DOE, 1994). Further, the supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Mexican Hat. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1991) and 60 FR 2854 (1995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Mexican Hat site are the Mexican Hat Long-Term Surveillance Plan (currently in progress), and the Mexican Hat Site Observational Work Plan (currently in progress)

  2. The Toggle Local Planner for sampling-based motion planning

    KAUST Repository

    Denny, Jory

    2012-05-01

    Sampling-based solutions to the motion planning problem, such as the probabilistic roadmap method (PRM), have become commonplace in robotics applications. These solutions are the norm as the dimensionality of the planning space grows, i.e., d > 5. An important primitive of these methods is the local planner, which is used for validation of simple paths between two configurations. The most common is the straight-line local planner which interpolates along the straight line between the two configurations. In this paper, we introduce a new local planner, Toggle Local Planner (Toggle LP), which extends local planning to a two-dimensional subspace of the overall planning space. If no path exists between the two configurations in the subspace, then Toggle LP is guaranteed to correctly return false. Intuitively, more connections could be found by Toggle LP than by the straight-line planner, resulting in better connected roadmaps. As shown in our results, this is the case, and additionally, the extra cost, in terms of time or storage, for Toggle LP is minimal. Additionally, our experimental analysis of the planner shows the benefit for a wide array of robots, with DOF as high as 70. © 2012 IEEE.

  3. Gas liquid sampling for closed canisters in KW Basin - test plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Test procedures for the gas/liquid sampler. Characterization of the Spent Nuclear Fuel, SNF, sealed in canisters at KW-Basin is needed to determine the state of storing SNF wet. Samples of the liquid and the gas in the closed canisters will be taken to gain characterization information. Sampling equipment has been designed to retrieve gas and liquid from the closed canisters in KW basin. This plan is written to outline the test requirements for this developmental sampling equipment

  4. Buffer AVL Alone Does Not Inactivate Ebola Virus in a Representative Clinical Sample Type.

    Science.gov (United States)

    Smither, Sophie J; Weller, Simon A; Phelps, Amanda; Eastaugh, Lin; Ngugi, Sarah; O'Brien, Lyn M; Steward, Jackie; Lonsdale, Steve G; Lever, Mark S

    2015-10-01

    Rapid inactivation of Ebola virus (EBOV) is crucial for high-throughput testing of clinical samples in low-resource, outbreak scenarios. The EBOV inactivation efficacy of Buffer AVL (Qiagen) was tested against marmoset serum (EBOV concentration of 1 × 10(8) 50% tissue culture infective dose per milliliter [TCID50 · ml(-1)]) and murine blood (EBOV concentration of 1 × 10(7) TCID50 · ml(-1)) at 4:1 vol/vol buffer/sample ratios. Posttreatment cell culture and enzyme-linked immunosorbent assay (ELISA) analysis indicated that treatment with Buffer AVL did not inactivate EBOV in 67% of samples, indicating that Buffer AVL, which is designed for RNA extraction and not virus inactivation, cannot be guaranteed to inactivate EBOV in diagnostic samples. Murine blood samples treated with ethanol (4:1 [vol/vol] ethanol/sample) or heat (60°C for 15 min) also showed no viral inactivation in 67% or 100% of samples, respectively. However, combined Buffer AVL and ethanol or Buffer AVL and heat treatments showed total viral inactivation in 100% of samples tested. The Buffer AVL plus ethanol and Buffer AVL plus heat treatments were also shown not to affect the extraction of PCR quality RNA from EBOV-spiked murine blood samples. © Crown copyright 2015.

  5. Failure-censored accelerated life test sampling plans for Weibull distribution under expected test time constraint

    International Nuclear Information System (INIS)

    Bai, D.S.; Chun, Y.R.; Kim, J.G.

    1995-01-01

    This paper considers the design of life-test sampling plans based on failure-censored accelerated life tests. The lifetime distribution of products is assumed to be Weibull with a scale parameter that is a log linear function of a (possibly transformed) stress. Two levels of stress higher than the use condition stress, high and low, are used. Sampling plans with equal expected test times at high and low test stresses which satisfy the producer's and consumer's risk requirements and minimize the asymptotic variance of the test statistic used to decide lot acceptability are obtained. The properties of the proposed life-test sampling plans are investigated

  6. Transuranic waste characterization sampling and analysis plan

    International Nuclear Information System (INIS)

    1994-01-01

    Los Alamos National Laboratory (the Laboratory) is located approximately 25 miles northwest of Santa Fe, New Mexico, situated on the Pajarito Plateau. Technical Area 54 (TA-54), one of the Laboratory's many technical areas, is a radioactive and hazardous waste management and disposal area located within the Laboratory's boundaries. The purpose of this transuranic waste characterization, sampling, and analysis plan (CSAP) is to provide a methodology for identifying, characterizing, and sampling approximately 25,000 containers of transuranic waste stored at Pads 1, 2, and 4, Dome 48, and the Fiberglass Reinforced Plywood Box Dome at TA-54, Area G, of the Laboratory. Transuranic waste currently stored at Area G was generated primarily from research and development activities, processing and recovery operations, and decontamination and decommissioning projects. This document was created to facilitate compliance with several regulatory requirements and program drivers that are relevant to waste management at the Laboratory, including concerns of the New Mexico Environment Department

  7. UMTRA project water sampling and analysis plan, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1994-06-01

    Surface remedial action was completed at the Salt Lake City, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site in the fall of 1987. Results of water sampling for the years 1992 to 1994 indicate that site-related ground water contamination occurs in the shallow unconfined aquifer (the uppermost aquifer). With respect to background ground water quality, contaminated ground water in the shallow, unconfined aquifer has elevated levels of chloride, sodium, sulfate, total dissolved solids, and uranium. No contamination associated with the former tailings pile occurs in levels exceeding background in ground water in the deeper confined aquifer. This document provides the water sampling and analysis plan for ground water monitoring at the former uranium processing site in Salt Lake City, Utah (otherwise known as the ''Vitro'' site, named after the Vitro Chemical Company that operated the mill). All contaminated materials removed from the processing site were relocated and stabilized in a disposal cell near Clive, Utah, some 85 miles west of the Vitro site (known as the ''Clive'' disposal site). No ground water monitoring is being performed at the Clive disposal site, since concurrence of the remedial action plan by the US Nuclear Regulatory Commission and completion of the disposal cell occurred before the US Environmental Protection Agency issued draft ground water standards in 1987 (52 FR 36000) for cleanup, stabilization, and control of residual radioactive materials at the disposal site. In addition, the likelihood of post-closure impact on the ground water is minimal to nonexistent, due to the naturally poor quality of the ground water. Water sampling activities planned for calendar year 1994 consist of sampling ground water from nine monitor wells to assess the migration of contamination within the shallow unconfined aquifer and sampling ground water from two existing monitor wells to assess ground water quality in the confined aquifer

  8. Statistical sampling plan for the TRU waste assay facility

    International Nuclear Information System (INIS)

    Beauchamp, J.J.; Wright, T.; Schultz, F.J.; Haff, K.; Monroe, R.J.

    1983-08-01

    Due to limited space, there is a need to dispose appropriately of the Oak Ridge National Laboratory transuranic waste which is presently stored below ground in 55-gal (208-l) drums within weather-resistant structures. Waste containing less than 100 nCi/g transuranics can be removed from the present storage and be buried, while waste containing greater than 100 nCi/g transuranics must continue to be retrievably stored. To make the necessary measurements needed to determine the drums that can be buried, a transuranic Neutron Interrogation Assay System (NIAS) has been developed at Los Alamos National Laboratory and can make the needed measurements much faster than previous techniques which involved γ-ray spectroscopy. The previous techniques are reliable but time consuming. Therefore, a validation study has been planned to determine the ability of the NIAS to make adequate measurements. The validation of the NIAS will be based on a paired comparison of a sample of measurements made by the previous techniques and the NIAS. The purpose of this report is to describe the proposed sampling plan and the statistical analyses needed to validate the NIAS. 5 references, 4 figures, 5 tables

  9. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste and High Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241-AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses

  10. Field Investigation Plan for 1301-N and 1325-N Facilities Sampling to Support Remedial Design

    International Nuclear Information System (INIS)

    Weiss, S. G.

    1998-01-01

    This field investigation plan (FIP) provides for the sampling and analysis activities supporting the remedial design planning for the planned removal action for the 1301-N and 1325-N Liquid Waste Disposal Facilities (LWDFs), which are treatment, storage,and disposal (TSD) units (cribs/trenches). The planned removal action involves excavation, transportation, and disposal of contaminated material at the Environmental Restoration Disposal Facility (ERDF).An engineering study (BHI 1997) was performed to develop and evaluate various options that are predominantly influenced by the volume of high- and low-activity contaminated soil requiring removal. The study recommended that additional sampling be performed to supplement historical data for use in the remedial design

  11. Compatibility Grab Sampling and Analysis Plan for FY 2000

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements to confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b)

  12. Planning Related to the Curation and Processing of Returned Martian Samples

    Science.gov (United States)

    McCubbin, F. M.; Harrington, A. D.

    2018-04-01

    Many of the planning activities in the NASA Astromaterials Acquisition and Curation Office at JSC are centered around Mars Sample Return. The importance of contamination knowledge and the benefits of a mobile/modular receiving facility are discussed.

  13. Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Maybell (DOE, 1994a). Further, this supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Maybell. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1994) and 60 CFR 2854 (1 995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Maybell site are the Maybell Baseline Risk Assessment (currently in progress), the Maybell Remedial Action Plan (RAP) (DOE, 1994b), and the Maybell Environmental Assessment (DOE, 1995)

  14. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  15. Planning Laws and Policies Which Influence the Use of Land in ...

    African Journals Online (AJOL)

    ... with the view to making proposals which will avail the acquired lands for rational use by the public and the government. It is also recommended that all levels of government embark on appropriate planning schemes as they are empowered by the Lagos State Urban and Regional Planning Act of 1998.. Africa Insight Vol.

  16. Chemical Hygiene Plan for Onsite Measurement and Sample Shipping Facility Activities

    International Nuclear Information System (INIS)

    Price, W.H.

    1998-01-01

    This chemical hygiene plan presents the requirements established to ensure the protection of employee health while performing work in mobile laboratories, the sample shipping facility, and at the onsite radiological counting facility. This document presents the measures to be taken to promote safe work practices and to minimize worker exposure to hazardous chemicals. Specific hazardous chemicals present in the mobile laboratories, the sample shipping facility, and in the radiological counting facility are presented in Appendices A through G

  17. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site

  18. Supplement to the UMTRA Project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project's present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b)

  19. C-018H Pre-Operational Baseline Sampling Plan

    International Nuclear Information System (INIS)

    Guzek, S.J.

    1993-01-01

    The objective of this task is to field characterize and sample the soil at selected locations along the proposed effluent line routes for Project C-018H. The overall purpose of this effort is to meet the proposed plan to discontinue the disposal of contaminated liquids into the Hanford soil column as described by DOE (1987). Detailed information describing proposed transport pipeline route and associated Kaiser Engineers Hanford Company (KEH) preliminary drawings (H288746...755) all inclusive, have been prepared by KEH (1992). The information developed from field monitoring and sampling will be utilized to characterize surface and subsurface soil along the proposed C-018H effluent pipeline and it's associated facilities. Potentially existing contaminant levels may be encountered therefore, soil characterization will provide a construction preoperational baseline reference, develop personnel safety requirements, and determine the need for any changes in the proposed routes prior to construction of the pipeline

  20. Food safety assurance systems: Microbiological testing, sampling plans, and microbiological criteria

    NARCIS (Netherlands)

    Zwietering, M.H.; Ross, T.; Gorris, L.G.M.

    2014-01-01

    Microbiological criteria give information about the quality or safety of foods. A key component of a microbiological criterion is the sampling plan. Considering: (1) the generally low level of pathogens that are deemed tolerable in foods, (2) large batch sizes, and (3) potentially substantial

  1. 10 CFR Appendix A to Subpart U of... - Sampling Plan for Enforcement Testing of Electric Motors

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing of Electric Motors A Appendix A to Subpart U of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY... to Subpart U of Part 431—Sampling Plan for Enforcement Testing of Electric Motors Step 1. The first...

  2. Double-Shell Tank (DST) Ventilation System Vapor Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples from the primary ventilation systems of the AN, AP, AW, and AY/AZ tank farms. Sampling will be performed in accordance with Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Air DQO) (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications. Vapor samples will be obtained from tank farm ventilation systems, downstream from the tanks and upstream of any filtration. Samples taken in support of the DQO will consist of SUMMA(trademark) canisters, triple sorbent traps (TSTs), sorbent tube trains (STTs), polyurethane foam (PUF) samples. Particulate filter samples and tritium traps will be taken for radiation screening to allow the release of the samples for analysis. The following sections provide the general methodology and procedures to be used in the preparation, retrieval, transport, analysis, and reporting of results from the vapor samples

  3. Crisis Communication (Handbooks of Communication Science Vol. 23)

    DEFF Research Database (Denmark)

    Johansen, Winni

    Vol. 23 - The Handbook of Communication Science General editors: Peter J. Schultz and Paul Cobley......Vol. 23 - The Handbook of Communication Science General editors: Peter J. Schultz and Paul Cobley...

  4. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  5. Health plan auditing: 100-percent-of-claims vs. random-sample audits.

    Science.gov (United States)

    Sillup, George P; Klimberg, Ronald K

    2011-01-01

    The objective of this study was to examine the relative efficacy of two different methodologies for auditing self-funded medical claim expenses: 100-percent-of-claims auditing versus random-sampling auditing. Multiple data sets of claim errors or 'exceptions' from two Fortune-100 corporations were analysed and compared to 100 simulated audits of 300- and 400-claim random samples. Random-sample simulations failed to identify a significant number and amount of the errors that ranged from $200,000 to $750,000. These results suggest that health plan expenses of corporations could be significantly reduced if they audited 100% of claims and embraced a zero-defect approach.

  6. Compatibility grab sampling and analysis plan for fiscal year 1999

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. Analytical requirements are taken from two revisions of the Compatibility data quality objectives (DQOs). Revision 1 of the DQO (Fowler 1995) listed analyses to be performed to meet both safety and operational data needs for the Compatibility program. Revision 2A of the DQO (Mulkey and Miller 1998) addresses only the safety-related requirements; the operational requirements of Fowler (1995) have not been superseded by Mulkey and Miller (1998). Therefore, safety-related data needs are taken from Mulkey and Miller (1998) and operational-related data needs are taken from Fowler (1995). Ammonia and total alpha analyses are also performed in accordance with Fowler (1998a, 1998b)

  7. Participatory land use planning for community based forest ...

    African Journals Online (AJOL)

    Participatory land use planning for community based forest management in South-Eastern Nigeria. FE Bisong, A Animashaun. Abstract. No Abstract. Lwati: A Journal of Contemporary Research Vol. 4 () 2007: pp.329-347. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  8. Development and Demonstration of a Method to Evaluate Bio-Sampling Strategies Using Building Simulation and Sample Planning Software.

    Science.gov (United States)

    Dols, W Stuart; Persily, Andrew K; Morrow, Jayne B; Matzke, Brett D; Sego, Landon H; Nuffer, Lisa L; Pulsipher, Brent A

    2010-01-01

    In an effort to validate and demonstrate response and recovery sampling approaches and technologies, the U.S. Department of Homeland Security (DHS), along with several other agencies, have simulated a biothreat agent release within a facility at Idaho National Laboratory (INL) on two separate occasions in the fall of 2007 and the fall of 2008. Because these events constitute only two realizations of many possible scenarios, increased understanding of sampling strategies can be obtained by virtually examining a wide variety of release and dispersion scenarios using computer simulations. This research effort demonstrates the use of two software tools, CONTAM, developed by the National Institute of Standards and Technology (NIST), and Visual Sample Plan (VSP), developed by Pacific Northwest National Laboratory (PNNL). The CONTAM modeling software was used to virtually contaminate a model of the INL test building under various release and dissemination scenarios as well as a range of building design and operation parameters. The results of these CONTAM simulations were then used to investigate the relevance and performance of various sampling strategies using VSP. One of the fundamental outcomes of this project was the demonstration of how CONTAM and VSP can be used together to effectively develop sampling plans to support the various stages of response to an airborne chemical, biological, radiological, or nuclear event. Following such an event (or prior to an event), incident details and the conceptual site model could be used to create an ensemble of CONTAM simulations which model contaminant dispersion within a building. These predictions could then be used to identify priority area zones within the building and then sampling designs and strategies could be developed based on those zones.

  9. 40 CFR Appendix Xi to Part 86 - Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles XI Appendix XI to Part 86 Protection of Environment ENVIRONMENTAL... Enforcement Auditing of Light-Duty Vehicles 40% AQL Table 1—Sampling Plan Code Letter Annual sales of...

  10. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  11. Tank 241-SY-101 push mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1998-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for push mode core samples from tank 241-SY-101 (SY-101). It is written in accordance with Data Quality Objective to Support Resolution of the Flammable Gas Safety Issue (Bauer 1998), Low Activity Waste Feed Data Quality Objectives (Wiemers and Miller 1997 and DOE 1998), Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Certa 1998), and the Tank Safety Screening Data Quality Objective (Dukelow et al. 1995). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues apply to tank SY-101 for this sampling event. Brown et al. also identifies high-level waste, regulatory, pretreatment and disposal issues as applicable issues for this tank. However, these issues will not be addressed via this sampling event

  12. Advances in boundary elements. Vol. 1-3

    International Nuclear Information System (INIS)

    Brebbia, C.A.; Connor, J.J.

    1989-01-01

    This book contains some of the edited papers presented at the 11th Boundary Element Conference, held in Cambridge, Massachusetts, during August 1989. The papers are arranged in three different books comprising the following topics: Vol. 1: Computations and Fundamentals - comprises sections on fundamentals, adaptive techniques, error and convergence, numerical methods and computational aspects. (283 p.). Vol. 2: Field and fluid flow solutions - includes the following topics: potential problems, thermal studies, electrical and electromagnetic problems, wave propagation, acoustics and fluid flow. (484 p.). Vol. 3: Stress analysis - deals with advances in linear problems, nonlinear problems, fracture mechanics, contact mechanics, optimization, geomechanics, plates and shells, vibrations and industrial applications. (450 p). (orig./HP)

  13. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-05-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination.

  14. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination

  15. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications

  16. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  17. Fixed-Precision Sequential Sampling Plans for Estimating Alfalfa Caterpillar, Colias lesbia, Egg Density in Alfalfa, Medicago sativa, Fields in Córdoba, Argentina

    Science.gov (United States)

    Serra, Gerardo V.; Porta, Norma C. La; Avalos, Susana; Mazzuferi, Vilma

    2013-01-01

    The alfalfa caterpillar, Colias lesbia (Fabricius) (Lepidoptera: Pieridae), is a major pest of alfalfa, Medicago sativa L. (Fabales: Fabaceae), crops in Argentina. Its management is based mainly on chemical control of larvae whenever the larvae exceed the action threshold. To develop and validate fixed-precision sequential sampling plans, an intensive sampling programme for C. lesbia eggs was carried out in two alfalfa plots located in the Province of Córdoba, Argentina, from 1999 to 2002. Using Resampling for Validation of Sampling Plans software, 12 additional independent data sets were used to validate the sequential sampling plan with precision levels of 0.10 and 0.25 (SE/mean), respectively. For a range of mean densities of 0.10 to 8.35 eggs/sample, an average sample size of only 27 and 26 sample units was required to achieve a desired precision level of 0.25 for the sampling plans of Green and Kuno, respectively. As the precision level was increased to 0.10, average sample size increased to 161 and 157 sample units for the sampling plans of Green and Kuno, respectively. We recommend using Green's sequential sampling plan because it is less sensitive to changes in egg density. These sampling plans are a valuable tool for researchers to study population dynamics and to evaluate integrated pest management strategies. PMID:23909840

  18. 'tomo_display' and 'vol_tools': IDL VM Packages for Tomography Data Reconstruction, Processing, and Visualization

    Science.gov (United States)

    Rivers, M. L.; Gualda, G. A.

    2009-05-01

    One of the challenges in tomography is the availability of suitable software for image processing and analysis in 3D. We present here 'tomo_display' and 'vol_tools', two packages created in IDL that enable reconstruction, processing, and visualization of tomographic data. They complement in many ways the capabilities offered by Blob3D (Ketcham 2005 - Geosphere, 1: 32-41, DOI: 10.1130/GES00001.1) and, in combination, allow users without programming knowledge to perform all steps necessary to obtain qualitative and quantitative information using tomographic data. The package 'tomo_display' was created and is maintained by Mark Rivers. It allows the user to: (1) preprocess and reconstruct parallel beam tomographic data, including removal of anomalous pixels, ring artifact reduction, and automated determination of the rotation center, (2) visualization of both raw and reconstructed data, either as individual frames, or as a series of sequential frames. The package 'vol_tools' consists of a series of small programs created and maintained by Guilherme Gualda to perform specific tasks not included in other packages. Existing modules include simple tools for cropping volumes, generating histograms of intensity, sample volume measurement (useful for porous samples like pumice), and computation of volume differences (for differential absorption tomography). The module 'vol_animate' can be used to generate 3D animations using rendered isosurfaces around objects. Both packages use the same NetCDF format '.volume' files created using code written by Mark Rivers. Currently, only 16-bit integer volumes are created and read by the packages, but floating point and 8-bit data can easily be stored in the NetCDF format as well. A simple GUI to convert sequences of tiffs into '.volume' files is available within 'vol_tools'. Both 'tomo_display' and 'vol_tools' include options to (1) generate onscreen output that allows for dynamic visualization in 3D, (2) save sequences of tiffs to disk

  19. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  20. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-08-05

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  1. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-07-29

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  2. Sampling and analysis plan for the consolidated sludge samples from the canisters and floor of the 105-K East basin

    International Nuclear Information System (INIS)

    BAKER, R.B.

    1999-01-01

    This Sampling and Analysis Plan (SAP) provides direction for sampling of fuel canister and floor Sludge from the K East Basin to complete the inventory of samples needed for Sludge treatment process testing. Sample volumes and sources consider recent reviews made by the Sludge treatment subproject. The representative samples will be characterized to the extent needed for the material to be used effectively for testing. Sampling equipment used allows drawing of large volume sludge samples and consolidation of sample material from a number of basin locations into one container. Once filled, the containers will be placed in a cask and transported to Hanford laboratories for recovery and evaluation. Included in the present SAP are the logic for sample location selection, laboratory analysis procedures required, and reporting needed to meet the Data Quality Objectives (DQOs) for this initiative

  3. Tracer gas diffusion sampling test plan

    International Nuclear Information System (INIS)

    Rohay, V.J.

    1993-01-01

    Efforts are under way to employ active and passive vapor extraction to remove carbon tetrachloride from the soil in the 200 West Area an the Hanford Site as part of the 200 West Area Carbon Tetrachloride Expedited Response Action. In the active approach, a vacuum is applied to a well, which causes soil gas surrounding the well to be drawn up to the surface. The contaminated air is cleaned by passage through a granular activated carbon bed. There are questions concerning the radius of influence associated with application of the vacuum system and related uncertainties about the soil-gas diffusion rates with and without the vacuum system present. To address these questions, a series of tracer gas diffusion sampling tests is proposed in which an inert, nontoxic tracer gas, sulfur hexafluoride (SF 6 ), will be injected into a well, and the rates of SF 6 diffusion through the surrounding soil horizon will be measured by sampling in nearby wells. Tracer gas tests will be conducted at sites very near the active vacuum extraction system and also at sites beyond the radius of influence of the active vacuum system. In the passive vapor extraction approach, barometric pressure fluctuations cause soil gas to be drawn to the surface through the well. At the passive sites, the effects of barometric ''pumping'' due to changes in atmospheric pressure will be investigated. Application of tracer gas testing to both the active and passive vapor extraction methods is described in the wellfield enhancement work plan (Rohay and Cameron 1993)

  4. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck bellows

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST)

  5. Continuing Medical Education - Vol 27, No 1 (2009)

    African Journals Online (AJOL)

    Continuing Medical Education - Vol 27, No 1 (2009). Journal Home > Archives > Vol 27, No 1 (2009). Log in or Register to get access to full text downloads. ... Addiction treatment · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. R Meyer ...

  6. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  7. International Journal of Humanistic Studies - Vol 3 (2004)

    African Journals Online (AJOL)

    International Journal of Humanistic Studies - Vol 3 (2004). Journal Home > Archives > Vol 3 (2004). Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register · Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives. DOWNLOAD FULL TEXT ...

  8. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  9. 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-01-01

    The 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  10. Evaluation of Capacity on a High Throughput Vol-oxidizer for Operability

    International Nuclear Information System (INIS)

    Kim, Young Hwan; Park, Geun Il; Lee, Jung Won; Jung, Jae Hoo; Kim, Ki Ho; Lee, Yong Soon; Lee, Do Youn; Kim, Su Sung

    2010-01-01

    KAERI is developing a pyro-process. As a piece of process equipment, a high throughput vol-oxidizer which can handle a several tens kg HM/batch was developed to supply U 3 O 8 powders to an electrolytic reduction(ER) reactor. To increase the reduction yield, UO 2 pellets should be converted into uniform powders. In this paper, we aim at the evaluation of a high throughput vol-oxidizer for operability. The evaluation consisted of 3 targets, a mechanical motion test, a heating test and hull separation test. In order to test a high throughput vol-oxidizer, By using a control system, mechanical motion tests of the vol-oxidizer were conducted, and heating rates were analyzed. Also the separation tests of hulls for recovery rate were conducted. The test results of the vol-oxidizer are going to be applied for operability. A study on the characteristics of the volatile gas produced during a vol-oxidation process is not included in this study

  11. Dynamics of structures '89. Vol. 3

    International Nuclear Information System (INIS)

    1989-01-01

    The proceedings, comprising 3 volumes published by the Plzen Centre of the Czechoslovak Society for Science and Technology (Vol. 1 and 2) and by Skoda Works in Plzen (Vol. 3), contain 107 papers, out of which 8 fall within the INIS Subject Scope; these deal with problems related to the earthquake resistance of nuclear power plants. Attention is paid to the evaluation of seismic characteristics of nuclear power plant equipment, to the equipment testing and to calculations of its dynamic characteristics under simulated seismic stress. (Z.M.)

  12. Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance

    Energy Technology Data Exchange (ETDEWEB)

    Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-30

    Public Law 105-119 directs the U.S. Department of Energy (DOE) to convey or transfer parcels of land to the Incorporated County of Los Alamos or their designees and to the Department of Interior, Bureau of Indian Affairs, in trust for the Pueblo de San Ildefonso. Los Alamos National Security is tasked to support DOE in conveyance and/or transfer of identified land parcels no later than September 2022. Under DOE Order 458.1, Radiation Protection of the Public and the Environment (O458.1, 2013) and Los Alamos National Laboratory (LANL or the Laboratory) implementing Policy 412 (P412, 2014), real property with the potential to contain residual radioactive material must meet the criteria for clearance and release to the public. This Sampling and Analysis Plan (SAP) is a second investigation of Tract A-18-2 for the purpose of verifying the previous sampling results (LANL 2017). This sample plan requires 18 projectspecific soil samples for use in radiological clearance decisions consistent with LANL Procedure ENV-ES-TP-238 (2015a) and guidance in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM, 2000). The sampling work will be conducted by LANL, and samples will be evaluated by a LANL-contracted independent lab. However, there will be federal review (verification) of all steps of the sampling process.

  13. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  14. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  15. Tank 241-Z-361 vapor sampling and analysis plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-02-23

    Tank 241-Z-361 is identified in the Hanford Federal Facility Agreement and Consent Order (commonly referred to as the Tri-Party Agreement), Appendix C, (Ecology et al. 1994) as a unit to be remediated under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). As such, the U.S. Environmental Protection Agency will serve as the lead regulatory agency for remediation of this tank under the CERCLA process. At the time this unit was identified as a CERCLA site under the Tri-Party Agreement, it was placed within the 200-ZP-2 Operable Unit. In 1997, The Tri-parties redefined 200 Area Operable Units into waste groupings (Waste Site Grouping for 200 Areas Soils Investigations [DOE-RL 1992 and 1997]). A waste group contains waste sites that share similarities in geological conditions, function, and types of waste received. Tank 241-Z-361 is identified within the CERCLA Plutonium/Organic-rich Process Condensate/Process Waste Group (DOE-RL 1992). The Plutonium/Organic-rich Process Condensate/Process Waste Group has been prioritized for remediation beginning in the year 2004. Results of Tank 216-Z-361 sampling and analysis described in this Sampling and Analysis Plan (SAP) and in the SAP for sludge sampling (to be developed) will determine whether expedited response actions are required before 2004 because of the hazards associated with tank contents. Should data conclude that remediation of this tank should occur earlier than is planned for the other sites in the waste group, it is likely that removal alternatives will be analyzed in a separate Engineering Evaluation/Cost Analysis (EE/CA). Removal actions would proceed after the U.S. Environmental Protection Agency (EPA) signs an Action Memorandum describing the selected removal alternative for Tank 216-Z-361. If the data conclude that there is no immediate threat to human health and the environment from this tank, remedial actions for the tank will be defined in a

  16. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters

  17. Planning spatial sampling of the soil from an uncertain reconnaissance variogram

    Science.gov (United States)

    Lark, R. Murray; Hamilton, Elliott M.; Kaninga, Belinda; Maseka, Kakoma K.; Mutondo, Moola; Sakala, Godfrey M.; Watts, Michael J.

    2017-12-01

    An estimated variogram of a soil property can be used to support a rational choice of sampling intensity for geostatistical mapping. However, it is known that estimated variograms are subject to uncertainty. In this paper we address two practical questions. First, how can we make a robust decision on sampling intensity, given the uncertainty in the variogram? Second, what are the costs incurred in terms of oversampling because of uncertainty in the variogram model used to plan sampling? To achieve this we show how samples of the posterior distribution of variogram parameters, from a computational Bayesian analysis, can be used to characterize the effects of variogram parameter uncertainty on sampling decisions. We show how one can select a sample intensity so that a target value of the kriging variance is not exceeded with some specified probability. This will lead to oversampling, relative to the sampling intensity that would be specified if there were no uncertainty in the variogram parameters. One can estimate the magnitude of this oversampling by treating the tolerable grid spacing for the final sample as a random variable, given the target kriging variance and the posterior sample values. We illustrate these concepts with some data on total uranium content in a relatively sparse sample of soil from agricultural land near mine tailings in the Copperbelt Province of Zambia.

  18. UMTRA project water sampling and analysis plan, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    This water sampling and analysis plan (WSAP) provides the basis for ground water sampling at the Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site during fiscal year 1994. It identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations and will be updated annually. The Ambrosia Lake site is in McKinley County, New Mexico, about 40 kilometers (km) (25 miles [mi]) north of Grants, New Mexico, and 1.6 km (1 mi) east of New Mexico Highway 509 (Figure 1.1). The town closest to the tailings pile is San Mateo, about 16 km ( 10 mi) southeast (Figure 1.2). The former mill and tailings pile are in Section 28, and two holding ponds are in Section 33, Township 14 North, Range 9 West. The site is shown on the US Geological Survey (USGS) map (USGS, 1980). The site is approximately 2100 meters (m) (7000 feet [ft]) above sea level

  19. Implementing reduced-risk integrated pest management in fresh-market cabbage: influence of sampling parameters, and validation of binomial sequential sampling plans for the cabbage looper (Lepidoptera Noctuidae).

    Science.gov (United States)

    Burkness, Eric C; Hutchison, W D

    2009-10-01

    Populations of cabbage looper, Trichoplusiani (Lepidoptera: Noctuidae), were sampled in experimental plots and commercial fields of cabbage (Brasicca spp.) in Minnesota during 1998-1999 as part of a larger effort to implement an integrated pest management program. Using a resampling approach and the Wald's sequential probability ratio test, sampling plans with different sampling parameters were evaluated using independent presence/absence and enumerative data. Evaluations and comparisons of the different sampling plans were made based on the operating characteristic and average sample number functions generated for each plan and through the use of a decision probability matrix. Values for upper and lower decision boundaries, sequential error rates (alpha, beta), and tally threshold were modified to determine parameter influence on the operating characteristic and average sample number functions. The following parameters resulted in the most desirable operating characteristic and average sample number functions; action threshold of 0.1 proportion of plants infested, tally threshold of 1, alpha = beta = 0.1, upper boundary of 0.15, lower boundary of 0.05, and resampling with replacement. We found that sampling parameters can be modified and evaluated using resampling software to achieve desirable operating characteristic and average sample number functions. Moreover, management of T. ni by using binomial sequential sampling should provide a good balance between cost and reliability by minimizing sample size and maintaining a high level of correct decisions (>95%) to treat or not treat.

  20. Microbiological sampling plan based on risk classification to verify supplier selection and production of served meals in food service operation.

    Science.gov (United States)

    Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke

    2014-08-01

    Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. TMI-2 accident evaluation program sample acquisition and examination plan. Executive summary

    International Nuclear Information System (INIS)

    Russell, M.L.; McCardell, R.K.; Broughton, J.M.

    1985-12-01

    The purpose of the TMI-2 Accident Evaluation Program Sample Acquisition and Examination (TMI-2 AEP SA and E) program is to develop and implement a test and inspection plan that completes the current-condition characterization of (a) the TMI-2 equipment that may have been damaged by the core damage events and (b) the TMI-2 core fission product inventory. The characterization program includes both sample acquisitions and examinations and in-situ measurements. Fission product characterization involves locating the fission products as well as determining their chemical form and determining material association

  2. Clinical Utility of 4D FDG-PET/CT Scans in Radiation Treatment Planning

    Energy Technology Data Exchange (ETDEWEB)

    Aristophanous, Michalis, E-mail: maristophanous@lroc.harvard.edu [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States); Berbeco, Ross I.; Killoran, Joseph H. [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States); Yap, Jeffrey T. [Department of Radiology, Dana-Farber Cancer Institute and Harvard Medical School, Boston, MA (United States); Sher, David J.; Allen, Aaron M.; Larson, Elysia; Chen, Aileen B. [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States)

    2012-01-01

    Purpose: The potential role of four-dimensional (4D) positron emission tomography (PET)/computed tomography (CT) in radiation treatment planning, relative to standard three-dimensional (3D) PET/CT, was examined. Methods and Materials: Ten patients with non-small-cell lung cancer had sequential 3D and 4D [{sup 18}F]fluorodeoxyglucose PET/CT scans in the treatment position prior to radiation therapy. The gross tumor volume and involved lymph nodes were contoured on the PET scan by use of three different techniques: manual contouring by an experienced radiation oncologist using a predetermined protocol; a technique with a constant threshold of standardized uptake value (SUV) greater than 2.5; and an automatic segmentation technique. For each technique, the tumor volume was defined on the 3D scan (VOL3D) and on the 4D scan (VOL4D) by combining the volume defined on each of the five breathing phases individually. The range of tumor motion and the location of each lesion were also recorded, and their influence on the differences observed between VOL3D and VOL4D was investigated. Results: We identified and analyzed 22 distinct lesions, including 9 primary tumors and 13 mediastinal lymph nodes. Mean VOL4D was larger than mean VOL3D with all three techniques, and the difference was statistically significant (p < 0.01). The range of tumor motion and the location of the tumor affected the magnitude of the difference. For one case, all three tumor definition techniques identified volume of moderate uptake of approximately 1 mL in the hilar region on the 4D scan (SUV maximum, 3.3) but not on the 3D scan (SUV maximum, 2.3). Conclusions: In comparison to 3D PET, 4D PET may better define the full physiologic extent of moving tumors and improve radiation treatment planning for lung tumors. In addition, reduction of blurring from free-breathing images may reveal additional information regarding regional disease.

  3. A sample lesson plan for the course English Composition II

    Directory of Open Access Journals (Sweden)

    Córdoba Cubillo, Patricia

    2005-03-01

    Full Text Available The goal of this article is to present a lesson plan and a series of sample tasks to help the instructors from the course English Composition II, at the School of Modern Languages from the University of Costa Rica, to guide students write an essay integrating the four skills: listening, speaking, reading, and writing. These activities will be a source of comprehensible input for the learners that will hopefully result in a good writing piece. El objetivo de este artículo es presentar un plan de lección y una serie de actividades que le ayudarán a los y las instructoras del curso Composición Inglesa II de la Escuela de Lenguas Modernas de la Universidad de Costa Rica a guiar a sus estudiantes a escribir un ensayo integrando las cuatro macro-destrezas, a saber comprensión auditiva, conversación, lectura y escritura. Mediante estas actividades se espera que los estudiantes elaboren un ensayo de calidad.

  4. Tank 241-SX-105 rotary mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    Simpson, B.C.

    1998-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for rotary mode core samples from tank 241-SX-105 (SX-105). It is written in accordance with Tank Safety Screening Data Quality Objective (Dukelow et al. 1995) and Memorandum of Understanding for the Organic Complexant Safety Issue Data Requirements (Schreiber 1997a). Vapor screening issues apply as well, but are outside the scope of this SAP. A physical profile prediction based on waste fill history and previous sampling information is provided in Appendix A. Prior to core sampling, the dome space (below the riser) shall be measured for the presence of flammable gases. The measurement shall be taken from within the dome space and the data reported as a percentage of the lower flammability limit (LFL). The results shall be transmitted to the tank coordinator within ten working days of the sampling event (Schreiber 1997b). If the results are above 25 percent of the LFL when analyzing by gas chromatography/mass spectrometry or gas-specific monitoring gauges or above 10% of the LFL when analyzing with a combustible gas meter, the necessity for recurring sampling for flammable gas concentration and the frequency of such sampling will be determined by the Flammable Gas Safety Project. Any additional vapor sampling is not within the scope of this SAP

  5. Vol 41 No 2

    African Journals Online (AJOL)

    Esem

    3 Centre for Primary Care Research. Medical Journal of Zambia, Vol. 41, No. 2: 59 - 64 (2014) ... pollutants by inhaling second-hand tobacco smoke are at risk of adverse health ..... To put the measured PM levels into perspective, a. 2.5. 5.

  6. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach.

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-12-26

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  7. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Directory of Open Access Journals (Sweden)

    Gabriele Ferri

    2015-12-01

    Full Text Available This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality, used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support. The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided

  8. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-01-01

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called Aη, is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  9. Sampling and Analysis Plan for N-Springs ERA pump-and-treat waste media

    International Nuclear Information System (INIS)

    Stankovich, M.T.

    1996-07-01

    This Sampling and Analysis Plan details the administrative procedures to be used to conduct sampling activities for characterization of spent ion-exchange resin, clinoptilolite, generated from the N-Springs pump-and-treat expedited response action. N-Springs (riverbank seeps) is located in the 100-N Area of the Hanford Site. Groundwater contained in the 100-NR-2 Operable Unit is contaminated with various radionuclides derived from wastewater disposal practices and spills associated with 100-N Reactor Operations

  10. Sampling and analysis plan (SAP) for WESF drains and TK-100 sump

    International Nuclear Information System (INIS)

    Simmons, F.M.

    1998-01-01

    The intent of this project is to determine whether the Waste Encapsulation and Storage Facility (WESF) floor drain piping and the TK-100 sump are free from contamination. TK-100 is currently used as a catch tank to transfer low level liquid waste from WESF to Tank Farms via B Plant. This system is being modified as part of the WESF decoupling since B Plant is being deactivated. As a result of the 1,1,1-trichloroethane (TCA) discovery in TK-100, the associated WESF floor drains and the pit sump need to be sampled. Breakdown constituents have been reviewed and found to be non-hazardous. There are 29 floor drains that tie into a common header leading into the tank. To prevent high exposure during sampling of the drains, TK-100 will be removed into the B Plant canyon and a new tank will be placed in the pit before any floor drain samples are taken. The sump will be sampled prior to TK-100 removal. A sample of the sludge and any liquid in the sump will be taken and analyzed for TCA and polychlorinated biphenyl (PCB). After the sump has been sampled, the vault floor will be flushed. The flush will be transferred from the sump into TK-100. TK-100 will be moved into B Plant. The vault will then be cleaned of debris and visually inspected. If there is no visual indication of TCA or PCB staining, the vault will be painted and a new tank installed. If there is an indication of TCA or PCB from laboratory analysis or staining, further negotiations will be required to determine a path forward. A total of 8 sets of three 40ml samples will be required for all of the floor drains and sump. The sump set will include one 125ml solid sample. The only analysis required will be for TCA in liquids. PCBs will be checked in sump solids only. The Sampling and Analysis Plan (SAP) is written to provide direction for the sampling and analytical activities of the 29 WESF floor drains and the TK-100 sump. The intent of this plan is to define the responsibilities of the various organizations

  11. Sampling and Analysis Plan for Tank 241-AP-108 Waste in Support of Evaporator Campaign 2000-1

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    2000-01-01

    This Tank Sampling and Analysis Plan (TSAP) identifies sample collection, laboratory analysis, quality assurance/quality control (QA/QC), and reporting objectives for the characterization of tank 241-AP-108 waste. Technical bases for these objectives are specified in the 242-A Evaporator Data Quality Objectives (Bowman 2000 and Von Bargen 1998) and 108-AP Tank Sampling Requirements in Support of Evaporator Campaign 2000-1 (Le 2000). Evaporator campaign 2000-1 will process waste from tank 241-AP-108 in addition to that from tank 241-AP-107. Characterization results will be used to support the evaporator campaign currently planned for early fiscal year 2000. No other needs (or issues) requiring data for this tank waste apply to this sampling event

  12. Index to Nuclear Safety. A technical progress review by chronology, permuted title, and author. Vol. 11, No. 1 through Vol. 15, No. 6

    International Nuclear Information System (INIS)

    Cottrell, W.B.; Klein, A.

    1975-04-01

    This issue of the Index to Nuclear Safety covers only articles included in Nuclear Safety, Vol. 11, No. 1, through Vol. 15, No. 6. This index is presented in three sections as follows: Chronological List of Articles by Volume; Permuted Title (KWIC) Index; and Author Index. (U.S.)

  13. Economic and Policy Review - Vol 13, No 3 (2007)

    African Journals Online (AJOL)

    Economic and Policy Review - Vol 13, No 3 (2007). Journal Home > Archives > Vol 13, No 3 ... Snagging the wheel of progress: Corruption, New anti-corruption drive and Nigeria\\'s quest for development. S B Kura ... Book Review: challenges of African growth opportunities, constraints and strategic directions. S I Owualah ...

  14. Sampling and analysis plan for assessment of beryllium in soils surrounding TA-40 building 15

    Energy Technology Data Exchange (ETDEWEB)

    Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-19

    Technical Area (TA) 40 Building 15 (40-15) is an active firing site at Los Alamos National Laboratory. The weapons facility operations (WFO) group plans to build an enclosure over the site in 2017, so that test shots may be conducted year-round. The enclosure project is described in PRID 16P-0209. 40-15 is listed on LANL OSH-ISH’s beryllium inventory, which reflects the potential for beryllium in/on soils and building surfaces at 40-15. Some areas in and around 40-15 have previously been sampled for beryllium, but past sampling efforts did not achieve complete spatial coverage of the area. This Sampling and Analysis Plan (SAP) investigates the area surrounding 40-15 via 9 deep (≥1-ft.) soil samples and 11 shallow (6-in.) soil samples. These samples will fill the spatial data gaps for beryllium at 40-15, and will be used to support OSH-ISH’s final determination of 40-15’s beryllium registry status. This SAP has been prepared by the Environmental Health Physics program in consultation with the Industrial Hygiene program. Industrial Hygiene is the owner of LANL’s beryllium program, and will make a final determination with regard to the regulatory status of beryllium at 40-15.

  15. Zede Journal - Vol 29 (2012)

    African Journals Online (AJOL)

    Journal Home > Archives > Vol 29 (2012) ... Leakage aware hardware and stochastic power scheduling for smart mobile devices ... Energy efficient topology for Wireless Mesh Networks · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  16. Comparison of PM collection efficiency of Gent and Airmatrics MiniVol portable air sampler

    International Nuclear Information System (INIS)

    Begum, Bilkis A.; Biswas, Swapan K.

    2005-01-01

    Gent PM sampler was developed as an integral part of several International Atomic Energy Agency sponsored coordinated research programmes (CRP) for collecting air particulate samples. On the other hand, the MiniVol Portable Air Sampler is a commercial ambient air sampler for particulate matter and non-reactive gases used by different agencies. Air quality management system requires comparable air quality data to be collected by different stake holders for assessment and regulatory purposes. In order to compare the characteristics of Gent sampler with the MiniVol Portable Air Sampler, the reproducibility of the sample mass collection efficiency were examined and the measured mass concentrations were compared. It was found that in case of PM 10 both samplers collect almost same fraction of PM 10 mass when the Gent sampler was operated at 16 litre per minute flow rate. But in case of fine fraction, Portable sampler collects 70% higher PM 2.5 mass concentration compared to the Gent PM 2.2 mass concentrations. This is because, the Gent sampler was typically operated at 16 to 17 lpm resulting in an estimated 50% cut point of 2.2 μm.(author)

  17. Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

    Energy Technology Data Exchange (ETDEWEB)

    Berryhill, Jesse Tobias [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gaukler, Shannon Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-26

    As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

  18. ANALYSING ACCEPTANCE SAMPLING PLANS BY MARKOV CHAINS

    Directory of Open Access Journals (Sweden)

    Mohammad Mirabi

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: In this research, a Markov analysis of acceptance sampling plans in a single stage and in two stages is proposed, based on the quality of the items inspected. In a stage of this policy, if the number of defective items in a sample of inspected items is more than the upper threshold, the batch is rejected. However, the batch is accepted if the number of defective items is less than the lower threshold. Nonetheless, when the number of defective items falls between the upper and lower thresholds, the decision-making process continues to inspect the items and collect further samples. The primary objective is to determine the optimal values of the upper and lower thresholds using a Markov process to minimise the total cost associated with a batch acceptance policy. A solution method is presented, along with a numerical demonstration of the application of the proposed methodology.

    AFRIKAANSE OPSOMMING: In hierdie navorsing word ’n Markov-ontleding gedoen van aannamemonsternemingsplanne wat plaasvind in ’n enkele stap of in twee stappe na gelang van die kwaliteit van die items wat geïnspekteer word. Indien die eerste monster toon dat die aantal defektiewe items ’n boonste grens oorskry, word die lot afgekeur. Indien die eerste monster toon dat die aantal defektiewe items minder is as ’n onderste grens, word die lot aanvaar. Indien die eerste monster toon dat die aantal defektiewe items in die gebied tussen die boonste en onderste grense lê, word die besluitnemingsproses voortgesit en verdere monsters word geneem. Die primêre doel is om die optimale waardes van die booonste en onderste grense te bepaal deur gebruik te maak van ’n Markov-proses sodat die totale koste verbonde aan die proses geminimiseer kan word. ’n Oplossing word daarna voorgehou tesame met ’n numeriese voorbeeld van die toepassing van die voorgestelde oplossing.

  19. A comparison of four gravimetric fine particle sampling methods.

    Science.gov (United States)

    Yanosky, J D; MacIntosh, D L

    2001-06-01

    A study was conducted to compare four gravimetric methods of measuring fine particle (PM2.5) concentrations in air: the BGI, Inc. PQ200 Federal Reference Method PM2.5 (FRM) sampler; the Harvard-Marple Impactor (HI); the BGI, Inc. GK2.05 KTL Respirable/Thoracic Cyclone (KTL); and the AirMetrics MiniVol (MiniVol). Pairs of FRM, HI, and KTL samplers and one MiniVol sampler were collocated and 24-hr integrated PM2.5 samples were collected on 21 days from January 6 through April 9, 2000. The mean and standard deviation of PM2.5 levels from the FRM samplers were 13.6 and 6.8 microg/m3, respectively. Significant systematic bias was found between mean concentrations from the FRM and the MiniVol (1.14 microg/m3, p = 0.0007), the HI and the MiniVol (0.85 microg/m3, p = 0.0048), and the KTL and the MiniVol (1.23 microg/m3, p = 0.0078) according to paired t test analyses. Linear regression on all pairwise combinations of the sampler types was used to evaluate measurements made by the samplers. None of the regression intercepts was significantly different from 0, and only two of the regression slopes were significantly different from 1, that for the FRM and the MiniVol [beta1 = 0.91, 95% CI (0.83-0.99)] and that for the KTL and the MiniVol [beta1 = 0.88, 95% CI (0.78-0.98)]. Regression R2 terms were 0.96 or greater between all pairs of samplers, and regression root mean square error terms (RMSE) were 1.65 microg/m3 or less. These results suggest that the MiniVol will underestimate measurements made by the FRM, the HI, and the KTL by an amount proportional to PM2.5 concentration. Nonetheless, these results indicate that all of the sampler types are comparable if approximately 10% variation on the mean levels and on individual measurement levels is considered acceptable and the actual concentration is within the range of this study (5-35 microg/m3).

  20. FIRM: Sampling-based feedback motion-planning under motion uncertainty and imperfect measurements

    KAUST Repository

    Agha-mohammadi, A.-a.; Chakravorty, S.; Amato, N. M.

    2013-01-01

    In this paper we present feedback-based information roadmap (FIRM), a multi-query approach for planning under uncertainty which is a belief-space variant of probabilistic roadmap methods. The crucial feature of FIRM is that the costs associated with the edges are independent of each other, and in this sense it is the first method that generates a graph in belief space that preserves the optimal substructure property. From a practical point of view, FIRM is a robust and reliable planning framework. It is robust since the solution is a feedback and there is no need for expensive replanning. It is reliable because accurate collision probabilities can be computed along the edges. In addition, FIRM is a scalable framework, where the complexity of planning with FIRM is a constant multiplier of the complexity of planning with PRM. In this paper, FIRM is introduced as an abstract framework. As a concrete instantiation of FIRM, we adopt stationary linear quadratic Gaussian (SLQG) controllers as belief stabilizers and introduce the so-called SLQG-FIRM. In SLQG-FIRM we focus on kinematic systems and then extend to dynamical systems by sampling in the equilibrium space. We investigate the performance of SLQG-FIRM in different scenarios. © The Author(s) 2013.

  1. FIRM: Sampling-based feedback motion-planning under motion uncertainty and imperfect measurements

    KAUST Repository

    Agha-mohammadi, A.-a.

    2013-11-15

    In this paper we present feedback-based information roadmap (FIRM), a multi-query approach for planning under uncertainty which is a belief-space variant of probabilistic roadmap methods. The crucial feature of FIRM is that the costs associated with the edges are independent of each other, and in this sense it is the first method that generates a graph in belief space that preserves the optimal substructure property. From a practical point of view, FIRM is a robust and reliable planning framework. It is robust since the solution is a feedback and there is no need for expensive replanning. It is reliable because accurate collision probabilities can be computed along the edges. In addition, FIRM is a scalable framework, where the complexity of planning with FIRM is a constant multiplier of the complexity of planning with PRM. In this paper, FIRM is introduced as an abstract framework. As a concrete instantiation of FIRM, we adopt stationary linear quadratic Gaussian (SLQG) controllers as belief stabilizers and introduce the so-called SLQG-FIRM. In SLQG-FIRM we focus on kinematic systems and then extend to dynamical systems by sampling in the equilibrium space. We investigate the performance of SLQG-FIRM in different scenarios. © The Author(s) 2013.

  2. Sampling and Analysis Plan for the 105-N Basin Water

    International Nuclear Information System (INIS)

    R.O. Mahood

    1997-01-01

    This sampling and analysis plan defines the strategy, and field and laboratory methods that will be used to characterize 105-N Basin water. The water will be shipped to the 200 Area Effluent Treatment Facility for treatment and disposal as part of N Reactor deactivation. These analyses are necessary to ensure that the water will meet the acceptance criteria of the ETF, as established in the Memorandum of Understanding for storage and treatment of water from N-Basin (Appendix A), and the characterization requirements for 100-N Area water provided in a letter from ETF personnel (Appendix B)

  3. samaru-main-vol 11 2011

    African Journals Online (AJOL)

    Library _info_Sc_ 1

    2004-07-11

    Jul 11, 2004 ... Samaru Journal of Information Studies Vol. 11 (1 & 2)2011 ... It is therefore paramount that the library ... source of primary and up to date information, both students and ... entertainment, arts, fashion, law, economy, medicine,.

  4. Planning Considerations for a Mars Sample Receiving Facility: Summary and Interpretation of Three Design Studies

    Science.gov (United States)

    Beaty, David W.; Allen, Carlton C.; Bass, Deborah S.; Buxbaum, Karen L.; Campbell, James K.; Lindstrom, David J.; Miller, Sylvia L.; Papanastassiou, Dimitri A.

    2009-10-01

    It has been widely understood for many years that an essential component of a Mars Sample Return mission is a Sample Receiving Facility (SRF). The purpose of such a facility would be to take delivery of the flight hardware that lands on Earth, open the spacecraft and extract the sample container and samples, and conduct an agreed-upon test protocol, while ensuring strict containment and contamination control of the samples while in the SRF. Any samples that are found to be non-hazardous (or are rendered non-hazardous by sterilization) would then be transferred to long-term curation. Although the general concept of an SRF is relatively straightforward, there has been considerable discussion about implementation planning. The Mars Exploration Program carried out an analysis of the attributes of an SRF to establish its scope, including minimum size and functionality, budgetary requirements (capital cost, operating costs, cost profile), and development schedule. The approach was to arrange for three independent design studies, each led by an architectural design firm, and compare the results. While there were many design elements in common identified by each study team, there were significant differences in the way human operators were to interact with the systems. In aggregate, the design studies provided insight into the attributes of a future SRF and the complex factors to consider for future programmatic planning.

  5. Vol 12, No 1 (2014)

    African Journals Online (AJOL)

    Egyptian Journal of Pediatric Allergy and Immunology (The) - Vol 12, No 1 (2014) ... The effect of serum angiotensin II and angiotensin II type 1 receptor gene ... with diabetic ketoacidosis · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  6. A Decision Support Tool for Planning the Sampling of Tank 19

    International Nuclear Information System (INIS)

    Edwards, T.B.

    2002-01-01

    The Statistical Consulting Section (SCS) of the Savannah River Technology Center (SRTC) was asked to develop a decision support system (DSS) to aid in the planning of the process to characterize the heel of Tank 19. This characterization is to be based on samples of the tank heel, and the DSS is to be used to help determine the number of samples that might be needed to provide a meaningful characterization based upon assumptions for relevant variations and volumes. The objective of this report is to describe the framework used to develop the DSS and to document its calculations. The DSS was developed as a Microsoft Excel spreadsheet. Detailed input and output for two test cases are provided in the appendix as part of the documentation of this spreadsheet

  7. Sampling and analysis plan for the 107-N Basin recirculation building liquid/sediment

    International Nuclear Information System (INIS)

    Thompson, W.S.

    1997-02-01

    This sampling and analysis plan (SAP) defines the strategy and the field and laboratory methods that will be used to characterize the liquids and sediment within the following four 100-N buildings/areas: 1310-N valve pit area inside the Radioactive Chemical Waste Treatment Pump House (silo); 1314-N Waste Pump (Overflow) Tank at the Liquid Waste Disposal Station; 105-N Lift Station pump well and valve pit areas inside the 105-N Reactor Building; and 107-N Basin Recirculation Building. This characterization activity is being performed in support of the work scope identified in the N Reactor Deactivation Program Plan and the sampling strategy in the DQO. The characterization data will be used for comparison to decontamination and decommissioning (D and D) endpoint acceptance criteria in preparation for turnover of the above-listed facilities to the D and D project. The data will also be used for waste acceptance criteria evaluation in the selection of the appropriate disposition option for liquid and sediment currently contained in the facilities

  8. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  9. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources

  10. Determination of uranium in industrial and environmental samples. Vol. 4

    Energy Technology Data Exchange (ETDEWEB)

    El-Sweify, F H; Shehata, M K; Metwally, E M; El-Shazly, E A.A.; El-Naggar, H A [Nuclear Chemistry Department, Hot Laborities Center, Atomic Energy Authority, Cairo (Egypt)

    1996-03-01

    The phosphate ores used at `Abu zaabal fertilizer and chemical company` for the production of some chemicals and fertilizers contain detectable amounts of uranium. In this study, the content of uranium in samples of different products of fertilizers, gypsum, and phosphate ore were determined using NAA, and gamma ray spectroscopy of the irradiated samples. Another method based on measuring the natural radioactivity of {sup 238} U series for non-irradiated samples using gamma-ray spectroscopy was also used for determine uranium content in the samples. In the NAA method, the content of U(ppm) in the samples was been computed from the photopeak activity of the lines = 106.1, 228.2, and 277.5 KeV of {sup 239} Np induced in the irradiated samples, and the uranium standard simultaneously irradiated. the gamma-ray spectra, and the decay curves are given. In the second method the gamma-ray spectra of the natural radioactivity of the samples and uranium standard were measured. The gamma-transition of energies 295.1, 251.9 KeV for {sup 214} Pb; 609.3, 768.4, 1120.3, 1238.1 KeV for {sup 214} Bi were determined. The uranium {sup 23U} traces in drainage water was also determined spectrophotometrically using arsenazo-III after preconcentration of uranium from the pretreated drainage water in column packed with chelex-100 resin. The recovery was found to be 90 {+-} 5%. 11 figs., 3 tabs.

  11. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  12. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  13. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    International Nuclear Information System (INIS)

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU

  14. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  15. Anestesia volátil e monitorização anestésica.

    OpenAIRE

    Alexandre, Nuno; Costa, Margarida; Mascarenhas, Ramiro

    2009-01-01

    Os autores apresentam um texto de apoio à disciplina de anestesiologia do curso de Medicina Veterinária .Neste texto são abordadas diversas temáticas da anestesia volátil tais como: equipamentos utilizados em anestesia volátil, farmacologia dos anestésicos voláteis. A monitorização dos pacientes é abordada na vertente mecânica ou intrumental e na componente básica.

  16. Index to Nuclear Safety: a technical progress review by chronology, permuted title, and author. Vol. 11(1)--Vol. 18(6)

    Energy Technology Data Exchange (ETDEWEB)

    Cottrell, W.B.; Klein, A.

    1978-04-11

    This index to Nuclear Safety covers articles published in Nuclear Safety, Vol. 11, No. 1 (January-February 1970), through Vol. 18, No. 6 (November-December 1977). It is divided into three sections: a chronological list of articles (including abstracts) followed by a permuted-title (KWIC) index and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center (NSIC), covers all safety aspects of nuclear power reactors and associated facilities. Over 450 technical articles published in Nuclear Safety in the last eight years are listed in this index.

  17. Index to Nuclear Safety: a technical progress review by chronology, permuted title, and author. Vol. 11(1)--Vol. 18(6)

    International Nuclear Information System (INIS)

    Cottrell, W.B.; Klein, A.

    1978-01-01

    This index to Nuclear Safety covers articles published in Nuclear Safety, Vol. 11, No. 1 (January-February 1970), through Vol. 18, No. 6 (November-December 1977). It is divided into three sections: a chronological list of articles (including abstracts) followed by a permuted-title (KWIC) index and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center (NSIC), covers all safety aspects of nuclear power reactors and associated facilities. Over 450 technical articles published in Nuclear Safety in the last eight years are listed in this index

  18. Ethiopian Journal of Health Sciences - Vol 28, No 2 (2018)

    African Journals Online (AJOL)

    Ethiopian Journal of Health Sciences - Vol 28, No 2 (2018). Journal Home > Archives > Vol 28, No 2 (2018). Log in or Register to get access to full text downloads. ... Prevalence of opportunistic intestinal parasites and associated factors among HIV patients while receiving ART at Arba Minch Hospital in southern Ethiopia: a ...

  19. Sampling and analysis plan for sludge located in fuel storage canisters of the 105-K West basin

    International Nuclear Information System (INIS)

    Baker, R.B.

    1997-01-01

    This Sampling and Analysis Plan (SAP) provides direction for the first sampling of sludge from the K West Basin spent fuel canisters. The specially developed sampling equipment removes representative samples of sludge while maintaining the radioactive sample underwater in the basin pool (equipment is described in WHC-SD-SNF-SDD-004). Included are the basic background logic for sample selection, the overall laboratory analyses required and the laboratory reporting required. These are based on requirements put forth in the data quality objectives (WHC-SD-SNF-DQO-012) established for this sampling and characterization activity

  20. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks Table 1—Sampling...

  1. Dynamics of structures '89. Vol. 1 and 2

    International Nuclear Information System (INIS)

    1989-01-01

    The proceedings, comprising 3 volumes published by the Plzen Centre of the Czechoslovak Society for Science and Technology (Vol. 1 and 2) and by Skoda Works in Plzen (Vol. 3), contain 107 papers, out of which 8 fall within the INIS Subject Scope; these deal with problems related to the earthquake resistance of nuclear power plants. Attention is paid to the evaluation of seismic characteristics of nuclear power plant equipment, to the equipment testing and to calculations of its dynamic characteristics under simulated seismic stress. (Z.M.)

  2. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  3. Large hadron collider workshop. Proceedings. Vol. 3

    International Nuclear Information System (INIS)

    Jarlskog, G.; Rein, D.

    1990-01-01

    The aim of the LHC workshop at Aachen was to discuss the 'discovery potential' of a high-luminosity hadron collider (the Large Hadron Collider) and to define the requirements of the detectors. Of central interest was whether a Higgs particle with mass below 1 TeV could be seen using detectors potentially available within a few years from now. Other topics included supersymmetry, heavy quarks, excited gauge bosons, and exotica in proton-proton collisions, as well as physics to be observed in electron-proton and heavy-ion collisions. A large part of the workshop was devoted to the discussion of instrumental and detector concepts, including simulation, signal processing, data acquisition, tracking, calorimetry, lepton identification and radiation hardness. The workshop began with parallel sessions of working groups on physics and instrumentaiton and continued, in the second half, with plenary talks giving overviews of the LHC project and the SSC, RHIC, and HERA programmes, summaries of the working groups, presentations from industry, and conclusions. Vol. 1 of these proceedings contains the papers presented at the plenary sessions, Vol. 2 the individual contributions to the physics sessions, and Vol. 3 those to the instrumentation sessions. (orig.)

  4. Large hadron collider workshop. Proceedings. Vol. 2

    International Nuclear Information System (INIS)

    Jarlskog, G.; Rein, D.

    1990-01-01

    The aim of the LHC workshop at Aachen was to discuss the 'discovery potential' of a high-luminosity hadron collider (the Large Hadron Collider) and to define the requirements of the detectors. Of central interest was whether a Higgs particle with mass below 1 TeV could be seen using detectors potentially available within a few years from now. Other topics included supersymmetry, heavy quarks, excited gauge bosons, and exotica in proton-proton collisions, as well as physics to be observed in electron-proton and heavy-ion collisions. A large part of the workshop was devoted to the discussion of instrumental and detector concepts, including simulation, signal processing, data acquisition, tracking, calorimetry, lepton identification and radiation hardness. The workshop began with parallel sessions of working groups on physics and instrumentation and continued, in the second half, with plenary talks giving overviews of the LHC project and the SSC, RHIC, and HERA programmes, summaries of the working groups, presentations from industry, and conclusions. Vol.1 of these proceedings contains the papers presented at the plenary sessions, Vol.2 the individual contributions to the physics sessions, and Vol.3 those to the instrumentation sessions. (orig.)

  5. Large hadron collider workshop. Proceedings. Vol. 1

    International Nuclear Information System (INIS)

    Jarlskog, G.; Rein, D.

    1990-01-01

    The aim of the LCH workshop at Aachen was to discuss the 'discovery potential' of a high-luminosity hadron collider (the Large Hadron Collider) and to define the requirements of the detectors. Of central interest was whether a Higgs particle with mass below 1 TeV could be seen using detectors potentially available within a few years from now. Other topics included supersymmetry, heavy quarks, excited gauge bosons, and exotica in proton-proton collisions, as well as physics to be observed in electron-proton and heavy-ion collisions. A large part of the workshop was devoted to the discussion of instrumental and detector concepts, including simulation, signal processing, data acquisition, tracking, calorimetry, lepton identification and radiation hardness. The workshop began with parallel sessions of working groups on physics and instrumentation and continued, in the second half, with plenary talks giving overviews of the LHC project and the SSC, RHIC, and HERA programmes, summaries of the working groups, presentations from industry, and conclusions. Vol. 1 of these proceedings contains the papers presented at the plenary sessions, Vol. 2 the individual contributions to the physics sessions, and Vol. 3 those to the instrumentation sessions. (orig.)

  6. Planning Multisentential English Text Using Communicative Acts

    Science.gov (United States)

    1990-12-01

    Composition, Vol. XI in series Advances in Discourse Processing, Alex Publishing Corporation. de Joia , A. and Stenton, A. 1980. Terms in Linguistics: A Guide to...investigate how attentional constraints relate to text planning and linguistic realization. 14 SUBJECT TE1MS I I N& De OF PAGES Natural Language Generation...surface form? Page I 4. What is the relation of communicative intentions to text structure and surface form? 5. What effects can texts be designed to have

  7. Errata Resonance, Vol.20, No.12, 2015. Rajaram Nityananda, Sun ...

    Indian Academy of Sciences (India)

    IAS Admin

    Resonance, Vol.20, No.12, 2015. Rajaram Nityananda, Sun, Sky and Clouds: Where Light and Matter Meet. Page 1121: The correct Figure 5 is reproduced below: Resonance, Vol.20, No.11, 2015. Anil Kumar, Felix Bloch (1905–1983). Page 956: Para 1, Line 5, 'also from Zürich' should be read as 'from nearby Bern'.

  8. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices

  9. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  10. Information manager-2011-Vol 11

    African Journals Online (AJOL)

    Library _info_Sc_ 1

    The Information Manager Vol. ... extent while carrying out their duties on a daily basis. ... It concluded by admonishing librarians to brace up and keep pace ... Proper training should be given to .... used to information and communication technologies .... proficiency Skills .... analysis of the workplace and implementation of.

  11. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  12. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  13. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  14. A novel derivation of a within-batch sampling plan based on a Poisson-gamma model characterising low microbial counts in foods.

    Science.gov (United States)

    Gonzales-Barron, Ursula; Zwietering, Marcel H; Butler, Francis

    2013-02-01

    This study proposes a novel step-wise methodology for the derivation of a sampling plan by variables for food production systems characterised by relatively low concentrations of the inspected microorganism. After representing the universe of contaminated batches by modelling the between-batch and within-batch variability in microbial counts, a tolerance criterion defining batch acceptability (i.e., up to a tolerance percentage of the food units having microbial concentrations lower or equal to a critical concentration) is established to delineate a limiting quality contour that separates satisfactory from unsatisfactory batches. The problem consists then of finding the optimum decision criterion - arithmetic mean of the analytical results (microbiological limit, m(L)) and the sample size (n) - that satisfies a pre-defined level of confidence measured on the samples' mean distributions from all possible true within-batch distributions. This is approached by obtaining decision landscape curves representing collectively the conditional and joint producer's and consumer's risks at different microbiological limits along with confidence intervals representing uncertainty due to the propagated between-batch variability. Whilst the method requires a number of risk management decisions to be made such as the objective of the sampling plan (GMP-based or risk-based), the modality of derivation, the tolerance criterion or level of safety, and the statistical level of confidence, the proposed method can be used when past monitoring data are available so as to produce statistically-sound dynamic sampling plans with optimised efficiency and discriminatory power. For the illustration of Enterobacteriaceae concentrations on Irish sheep carcasses, a sampling regime of n=10 and m(L)=17.5CFU/cm(2) is recommended to ensure that the producer has at least a 90% confidence of accepting a satisfactory batch whilst the consumer at least a 97.5% confidence that a batch will not be

  15. A Fixed-Precision Sequential Sampling Plan for the Potato Tuberworm Moth, Phthorimaea operculella Zeller (Lepidoptera: Gelechidae), on Potato Cultivars.

    Science.gov (United States)

    Shahbi, M; Rajabpour, A

    2017-08-01

    Phthorimaea operculella Zeller is an important pest of potato in Iran. Spatial distribution and fixed-precision sequential sampling for population estimation of the pest on two potato cultivars, Arinda ® and Sante ® , were studied in two separate potato fields during two growing seasons (2013-2014 and 2014-2015). Spatial distribution was investigated by Taylor's power law and Iwao's patchiness. Results showed that the spatial distribution of eggs and larvae was random. In contrast to Iwao's patchiness, Taylor's power law provided a highly significant relationship between variance and mean density. Therefore, fixed-precision sequential sampling plan was developed by Green's model at two precision levels of 0.25 and 0.1. The optimum sample size on Arinda ® and Sante ® cultivars at precision level of 0.25 ranged from 151 to 813 and 149 to 802 leaves, respectively. At 0.1 precision level, the sample sizes varied from 5083 to 1054 and 5100 to 1050 leaves for Arinda ® and Sante ® cultivars, respectively. Therefore, the optimum sample sizes for the cultivars, with different resistance levels, were not significantly different. According to the calculated stop lines, the sampling must be continued until cumulative number of eggs + larvae reached to 15-16 or 96-101 individuals at precision levels of 0.25 or 0.1, respectively. The performance of the sampling plan was validated by resampling analysis using resampling for validation of sampling plans software. The sampling plant provided in this study can be used to obtain a rapid estimate of the pest density with minimal effort.

  16. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  17. On The Use Of Network Sampling In Diabetic Surveys | Nafiu ...

    African Journals Online (AJOL)

    Two estimators: Hansen-Hurwitz estimator and Horvitz-Thompson estimator were considered; and the results were obtained using a program written in Microsoft Visual C++ programming language. Keywords: Graph, Sampling Frame, Households, Hansen-Hurwitz estimator and Horvitz-Thompson estimator. JORIND Vol.

  18. Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites

  19. UMTRA project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1994-04-01

    The Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site is a former uranium mill that is undergoing surface remediation in the form of on-site tailings stabilization. Contaminated surface materials from the Monument Valley, Arizona, UMTRA Project site have been transported to the Mexican Hat site and are being consolidated with the Mexican Hat tailings. The scheduled completion of the tailings disposal cell is August 1995. Water is found in two geologic units at the site: the Halgaito Shale Formation and the Honaker Trail Formation. The tailings rest on the Halgaito Shale, and water contained in that unit is a result of milling activities and, to a lesser extent, water released from the tailings from compaction during remedial action construction of the disposal cell. Water in the Halgaito Shale flows through fractures and discharges at seeps along nearby arroyos. Flow from the seeps will diminish as water drains from the unit. Ground water in the lower unit, the Honaker Trail Formation, is protected from contamination by an upward hydraulic gradient. There are no nearby water supply wells because of widespread poor background ground water quality and quantity, and the San Juan River shows no impacts from the site. This water sampling and analysis plan (WSAP) recommends sampling six seeps and one upgradient monitor well compared in the Honaker Trail Formation. Samples will be taken in April 1994 (representative of high group water levels) and September 1994 (representative of low ground water levels). Analyses will be performed on filtered samples for plume indicator parameters

  20. Index to Nuclear Safety. A technical progress review by chronology, permuted title, and author. Vol. 11, No. 1--Vol. 17, No. 6

    International Nuclear Information System (INIS)

    Cottrell, W.B.; Klein, A.

    1977-01-01

    This index to Nuclear Safety covers articles in Nuclear Safety Vol. 11, No. 1 (Jan.-Feb. 1970), through Vol. 17, No. 6 (Nov.-Dec. 1976). The index includes a chronological list of articles (including abstract) followed by KWIC and Author Indexes. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. The index lists over 350 technical articles in the last six years of publication

  1. Index to Nuclear Safety. A technical progress review by chronology, permuted title, and author. Vol. 11, No. 1--Vol. 17, No. 6

    Energy Technology Data Exchange (ETDEWEB)

    Cottrell, W.B.; Klein, A.

    1977-02-23

    This index to Nuclear Safety covers articles in Nuclear Safety Vol. 11, No. 1 (Jan.-Feb. 1970), through Vol. 17, No. 6 (Nov.-Dec. 1976). The index includes a chronological list of articles (including abstract) followed by KWIC and Author Indexes. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. The index lists over 350 technical articles in the last six years of publication.

  2. Sample size planning for composite reliability coefficients: accuracy in parameter estimation via narrow confidence intervals.

    Science.gov (United States)

    Terry, Leann; Kelley, Ken

    2012-11-01

    Composite measures play an important role in psychology and related disciplines. Composite measures almost always have error. Correspondingly, it is important to understand the reliability of the scores from any particular composite measure. However, the point estimates of the reliability of composite measures are fallible and thus all such point estimates should be accompanied by a confidence interval. When confidence intervals are wide, there is much uncertainty in the population value of the reliability coefficient. Given the importance of reporting confidence intervals for estimates of reliability, coupled with the undesirability of wide confidence intervals, we develop methods that allow researchers to plan sample size in order to obtain narrow confidence intervals for population reliability coefficients. We first discuss composite reliability coefficients and then provide a discussion on confidence interval formation for the corresponding population value. Using the accuracy in parameter estimation approach, we develop two methods to obtain accurate estimates of reliability by planning sample size. The first method provides a way to plan sample size so that the expected confidence interval width for the population reliability coefficient is sufficiently narrow. The second method ensures that the confidence interval width will be sufficiently narrow with some desired degree of assurance (e.g., 99% assurance that the 95% confidence interval for the population reliability coefficient will be less than W units wide). The effectiveness of our methods was verified with Monte Carlo simulation studies. We demonstrate how to easily implement the methods with easy-to-use and freely available software. ©2011 The British Psychological Society.

  3. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophonoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  4. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  5. NJB VOL.34 Original Lower.cdr

    African Journals Online (AJOL)

    important sources of renewable biological ... The plantain (Musa paradisiaca) and banana chemicals (Nowak et ... fermentable sugars available for bio-ethanol ..... peels. Afr. J. Biochem. Res. 9(9): 104 - 109. 70. Osho et al./ Nig. J. Biotech. Vol.

  6. Central African Journal of Medicine - Vol 60, No 9-12 (2016)

    African Journals Online (AJOL)

    Central African Journal of Medicine - Vol 60, No 9-12 (2016). Journal Home > Archives > Vol 60, No 9-12 (2016). Supplementary Issue. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register · Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue ...

  7. Clinics in Mother and Child Health - Vol 5, No 1 (2008)

    African Journals Online (AJOL)

    Clinics in Mother and Child Health - Vol 5, No 1 (2008). Journal Home > Archives > Vol 5, No 1 (2008). Special Edition - Congress Abstracts. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register · Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue ...

  8. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    Energy Technology Data Exchange (ETDEWEB)

    Cornwell, Paris A [ORNL; Bunn, Jeffrey R [ORNL; Schmidlin, Joshua E [ORNL; Hubbard, Camden R [ORNL

    2012-04-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the

  9. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    International Nuclear Information System (INIS)

    Cornwell, Paris A.; Bunn, Jeffrey R.; Schmidlin, Joshua E.; Hubbard, Camden R.

    2012-01-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the scan arm creates. Once

  10. Proceedings of the Seventh Conference of Nuclear Sciences and Applications. Vol.1,2,3

    International Nuclear Information System (INIS)

    Aly, H.F.

    2000-01-01

    The publication has been set up as a textbook for nuclear sciences and applications vol.1: (1) radiochemistry; (2) radiation chemistry; (3) isotope production; (4) waste management; vol.2: (1) nuclear and reactor; (2) physics; (3) plasma physics; (4) instrumentation and devices; (5) trace and ultra trace analysis; (6) environmental; vol.3: (1) radiation protection; (2) radiation health hazards; (3) nuclear safety; (4) biology; (5) agriculture

  11. Proceedings of the Seventh Conference of Nuclear Sciences and Applications. Vol.1,2,3

    Energy Technology Data Exchange (ETDEWEB)

    Aly, H F [ed.

    2000-07-01

    The publication has been set up as a textbook for nuclear sciences and applications vol.1: (1) radiochemistry; (2) radiation chemistry; (3) isotope production; (4) waste management; vol.2: (1) nuclear and reactor; (2) physics; (3) plasma physics; (4) instrumentation and devices; (5) trace and ultra trace analysis; (6) environmental; vol.3: (1) radiation protection; (2) radiation health hazards; (3) nuclear safety; (4) biology; (5) agriculture.

  12. Spatial Distribution and Sampling Plans With Fixed Level of Precision for Citrus Aphids (Hom., Aphididae) on Two Orange Species.

    Science.gov (United States)

    Kafeshani, Farzaneh Alizadeh; Rajabpour, Ali; Aghajanzadeh, Sirous; Gholamian, Esmaeil; Farkhari, Mohammad

    2018-04-02

    Aphis spiraecola Patch, Aphis gossypii Glover, and Toxoptera aurantii Boyer de Fonscolombe are three important aphid pests of citrus orchards. In this study, spatial distributions of the aphids on two orange species, Satsuma mandarin and Thomson navel, were evaluated using Taylor's power law and Iwao's patchiness. In addition, a fixed-precision sequential sampling plant was developed for each species on the host plant by Green's model at precision levels of 0.25 and 0.1. The results revealed that spatial distribution parameters and therefore the sampling plan were significantly different according to aphid and host plant species. Taylor's power law provides a better fit for the data than Iwao's patchiness regression. Except T. aurantii on Thomson navel orange, spatial distribution patterns of the aphids were aggregative on both citrus. T. aurantii had regular dispersion pattern on Thomson navel orange. Optimum sample size of the aphids varied from 30-2061 and 1-1622 shoots on Satsuma mandarin and Thomson navel orange based on aphid species and desired precision level. Calculated stop lines of the aphid species on Satsuma mandarin and Thomson navel orange ranged from 0.48 to 19 and 0.19 to 80.4 aphids per 24 shoots according to aphid species and desired precision level. The performance of the sampling plan was validated by resampling analysis using resampling for validation of sampling plans (RVSP) software. This sampling program is useful for IPM program of the aphids in citrus orchards.

  13. Proceedings of the second international conference on environmental impact assessment of all economical activities. Vol. 1

    International Nuclear Information System (INIS)

    1993-01-01

    Proceedings of the conference consist of 3 volumes: Vol. 1 - 'Environmental Impact Assessment of all Economical Activities including Industry'; Vol. 2 - 'Air Pollution Control and Prevention'; Vol. 3 - Waste Management and Environmental Problems in Construction Industry'. Out of 32 papers contained in Vol. 1, 2 were inputted to INIS. They deal with models of radionuclide transport in food chains and the use of aerial monitoring in the study of environmental contamination. (Z.S.)

  14. Radiotracers in medical applications, vols 1-2

    International Nuclear Information System (INIS)

    Rayudu, G.V.S.

    1983-01-01

    These volumes will serve as a basis for instruction and reference for professionals such as radiopharmaceutical chemists, radiopharmacologists, radiopharmacists, radiobiochemists, and others involved in the medical applications of radiotracers. Vol. I: Topics include radiohalogenated compounds, including radioiodine; Tc-labeled compounds; and in-house prepared radiopharmaceuticals. The charge particle range vs. energy in every element is tabulated for protons for cyclotrons users. Discussions are also provided on nonimaging radiotracer methods; 11 C, 13 N, 15 O, 67 Ga. 111 In, 75 Se, /SUP 123m/ Te compounds; radioactive noble gases; and miscellaneous radiotracers for imaging. Vol. II: Pertinent nuclear science data such as radiation dosimetry, radionuclide production modes, radionuclides for therapy, human experimentation regulations and consent forms, and radiotracer laboratory designs are presented

  15. Z Physics at LEP 1. Vol. 3

    International Nuclear Information System (INIS)

    Altarelli, G.; Kleiss, R.; Verzegnassi, C.

    1989-01-01

    The contents of this final report from the Workshop on Z Physics at LEP can be divided into two parts. The first part, comprising Vols. 1 and 2, is a relatively concise but fairly complete handbook on the physics of e + e - annihilation near the Z peak (with normal LEP luminosity and unpolarized beams, appropriate for the first phase of LEP operation). The second part (Vol. 3) is devoted to a review of the existing Monte Carlo event generators for LEP physics. A special effort has been made to co-ordinate the different parts of this report, with the aim of achieving a systematic and balanced review of the subject, rather than having simply a collection of separate contributions. (orig.)

  16. Z physics at LEP 1. Vol. 1

    International Nuclear Information System (INIS)

    Altarelli, G.; Kleiss, R.; Verzegnassi, C.

    1989-01-01

    The contents of this final report from the Workshop on Z Physics at LEP can be divided into two parts. The first part, comprising Vols. 1 and 2, is a relatively concise but fairly complete handbook on the physics of e + e - annihilation near the Z peak (with normal LEP luminosity and unpolarized beams, appropriate for the first phase of LEP operation). The second part (Vol. 3) is devoted to a review of the existing Monte Carlo event generators for LEP physics. A special effort has been made to co-ordinate the different parts of this report, with the aim of achieving a systematic and balanced review of the subject, rather than having simply a collection of separate contributions. (orig.)

  17. Determination of the influence of dispersion pattern of pesticide-resistant individuals on the reliability of resistance estimates using different sampling plans.

    Science.gov (United States)

    Shah, R; Worner, S P; Chapman, R B

    2012-10-01

    Pesticide resistance monitoring includes resistance detection and subsequent documentation/ measurement. Resistance detection would require at least one (≥1) resistant individual(s) to be present in a sample to initiate management strategies. Resistance documentation, on the other hand, would attempt to get an estimate of the entire population (≥90%) of the resistant individuals. A computer simulation model was used to compare the efficiency of simple random and systematic sampling plans to detect resistant individuals and to document their frequencies when the resistant individuals were randomly or patchily distributed. A patchy dispersion pattern of resistant individuals influenced the sampling efficiency of systematic sampling plans while the efficiency of random sampling was independent of such patchiness. When resistant individuals were randomly distributed, sample sizes required to detect at least one resistant individual (resistance detection) with a probability of 0.95 were 300 (1%) and 50 (10% and 20%); whereas, when resistant individuals were patchily distributed, using systematic sampling, sample sizes required for such detection were 6000 (1%), 600 (10%) and 300 (20%). Sample sizes of 900 and 400 would be required to detect ≥90% of resistant individuals (resistance documentation) with a probability of 0.95 when resistant individuals were randomly dispersed and present at a frequency of 10% and 20%, respectively; whereas, when resistant individuals were patchily distributed, using systematic sampling, a sample size of 3000 and 1500, respectively, was necessary. Small sample sizes either underestimated or overestimated the resistance frequency. A simple random sampling plan is, therefore, recommended for insecticide resistance detection and subsequent documentation.

  18. 300-FF-1 remedial action sampling and analysis plan DQO process summary report

    International Nuclear Information System (INIS)

    Carlson, R.A.

    1997-01-01

    The scope of the 300-FF-1 Operable Unit (OU) data quality objective (DQO) process includes the soil and debris from the waste sites identified in the Proposed Plan for the 300-FF-1 and 300-FF-5 Operable units and, as the DQO process evolved, refined by the 300-FF-1 Record of Decision (ROD). Exclusions are identified in Section 1.3. The 300-FF-1 waste sites are addressed throughout the DQO process as they were subdivided in the proposed plan. The waste sites are divided into areas or zones known to be above the cleanup standards, zones below the cleanup standards, and zones where the contamination level is currently unknown. The project objectives are (1) to identify the criteria by which 300-FF-1 contaminated soil and debris may be shipped to the Environmental Restoration Disposal Facility (ERDF), (2) to identify the criteria by which the 300-FF-1 waste sites can be demonstrated as meeting the cleanup criteria, and (3) to develop a sampling and analysis plan (SAP) that adequately allows the evaluation of soil and debris analysis against the criteria

  19. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  20. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael George

    2016-01-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  1. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  2. Specified assurance level sampling procedure

    International Nuclear Information System (INIS)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level

  3. Proceedings of the 1. Arabic conference on chemical applications (Chemia 2). Vol. 2

    International Nuclear Information System (INIS)

    1997-11-01

    The conference of chemical application was held on 1-5 Nov 1997 in Cairo, This vol.2 contains of chemical application on nuclear materials. Studies on these vol.This second volume covers papers presented on the subjects

  4. Proceedings of the second international conference on environmental impact assessment of all economical activities. Vol. 2

    International Nuclear Information System (INIS)

    1993-01-01

    Proceedings of the conference consist of 3 volumes: Vol. 1 - 'Environmental Impact Assessment of all Economical Activities including Industry'; Vol. 2 - 'Air Pollution Control and Prevention'; Vol. 3 - Waste Management and Environmental Problems in Construction Industry'. Out of 32 papers contained in Vol. 2, 4 were inputted to INIS. They deal with nuclear fusion as a potential energy source, with environmental aspects of disposal of ashes from power plants in the Czech Republic, and with land reclamation after mining activities. (Z.S.)

  5. UMTRA project water sampling and analysis plan, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-07-01

    Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing

  6. Index to Nuclear Safety. A technical progress review by chronology, permuted title, and author. Vol 11, No. 1 through Vol. 16, No. 6

    International Nuclear Information System (INIS)

    Cottrell, W.B.; Klein, A.

    1976-04-01

    This index to Nuclear Safety covers articles in Nuclear Safety Vol. 11, No. 1 (Jan.-Feb. 1970) through Vol. 16, No. 6 (Nov.-Dec. 1975). Included in the index is a chronological list of articles (including abstract) followed by both a KWIC index and an Author Index. Nuclear Safety is a bimonthly technical progress review prepared by the Nuclear Safety Information Center and covers all safety aspects of nuclear power reactors and associated facilities. The index lists over 300 technical articles in the last six years of publication

  7. Index to Nuclear Safety. A technical progress review by chronology, permuted title, and author. Vol 11, No. 1 through Vol. 16, No. 6

    Energy Technology Data Exchange (ETDEWEB)

    Cottrell, W.B.; Klein, A.

    1976-04-01

    This index to Nuclear Safety covers articles in Nuclear Safety Vol. 11, No. 1 (Jan.-Feb. 1970) through Vol. 16, No. 6 (Nov.-Dec. 1975). Included in the index is a chronological list of articles (including abstract) followed by both a KWIC index and an Author Index. Nuclear Safety is a bimonthly technical progress review prepared by the Nuclear Safety Information Center and covers all safety aspects of nuclear power reactors and associated facilities. The index lists over 300 technical articles in the last six years of publication.

  8. Zoonoses action plan Salmonella monitoring programme: an investigation of the sampling protocol.

    Science.gov (United States)

    Snary, E L; Munday, D K; Arnold, M E; Cook, A J C

    2010-03-01

    The Zoonoses Action Plan (ZAP) Salmonella Programme was established by the British Pig Executive to monitor Salmonella prevalence in quality-assured British pigs at slaughter by testing a sample of pigs with a meat juice enzyme-linked immunosorbent assay for antibodies against group B and C(1) Salmonella. Farms were assigned a ZAP level (1 to 3) depending on the monitored prevalence, and ZAP 2 or 3 farms were required to act to reduce the prevalence. The ultimate goal was to reduce the risk of human salmonellosis attributable to British pork. A mathematical model has been developed to describe the ZAP sampling protocol. Results show that the probability of assigning a farm the correct ZAP level was high, except for farms that had a seroprevalence close to the cutoff points between different ZAP levels. Sensitivity analyses identified that the probability of assigning a farm to the correct ZAP level was dependent on the sensitivity and specificity of the test, the number of batches taken to slaughter each quarter, and the number of samples taken per batch. The variability of the predicted seroprevalence was reduced as the number of batches or samples increased and, away from the cutoff points, the probability of being assigned the correct ZAP level increased as the number of batches or samples increased. In summary, the model described here provided invaluable insight into the ZAP sampling protocol. Further work is required to understand the impact of the program for Salmonella infection in British pig farms and therefore on human health.

  9. Technology Development and Advanced Planning for Curation of Returned Mars Samples

    Science.gov (United States)

    Lindstrom, David J.; Allen, Carlton C.

    2002-01-01

    NASA Johnson Space Center (JSC) curates extraterrestrial samples, providing the international science community with lunar rock and soil returned by the Apollo astronauts, meteorites collected in Antarctica, cosmic dust collected in the stratosphere, and hardware exposed to the space environment. Curation comprises initial characterization of new samples, preparation and allocation of samples for research, and clean, secure long-term storage. The foundations of this effort are the specialized cleanrooms (class 10 to 10,000) for each of the four types of materials, the supporting facilities, and the people, many of whom have been doing detailed work in clean environments for decades. JSC is also preparing to curate the next generation of extraterrestrial samples. These include samples collected from the solar wind, a comet, and an asteroid. Early planning and R\\&D are underway to support post-mission sample handling and curation of samples returned from Mars. One of the strong scientific reasons for returning samples from Mars is to search for evidence of current or past life in the samples. Because of the remote possibility that the samples may contain life forms that are hazardous to the terrestrial biosphere, the National Research Council has recommended that all samples returned from Mars be kept under strict biological containment until tests show that they can safely be released to other laboratories. It is possible that Mars samples may contain only scarce or subtle traces of life or prebiotic chemistry that could readily be overwhelmed by terrestrial contamination . Thus, the facilities used to contain, process, and analyze samples from Mars must have a combination of high-level biocontainment and organic / inorganic chemical cleanliness that is unprecedented. JSC has been conducting feasibility studies and developing designs for a sample receiving facility that would offer biocontainment at least the equivalent of current maximum containment BSL-4 (Bio

  10. Dispersion patterns and sampling plans for Diaphorina citri (Hemiptera: Psyllidae) in citrus.

    Science.gov (United States)

    Sétamou, Mamoudou; Flores, Daniel; French, J Victor; Hall, David G

    2008-08-01

    The abundance and spatial dispersion of Diaphorina citri Kuwayama (Hemiptera: Psyllidae) were studied in 34 grapefruit (Citrus paradisi Macfad.) and six sweet orange [Citrus sinensis (L.) Osbeck] orchards from March to August 2006 when the pest is more abundant in southern Texas. Although flush shoot infestation levels did not vary with host plant species, densities of D. citri eggs, nymphs, and adults were significantly higher on sweet orange than on grapefruit. D. citri immatures also were found in significantly higher numbers in the southeastern quadrant of trees than other parts of the canopy. The spatial distribution of D. citri nymphs and adults was analyzed using Iowa's patchiness regression and Taylor's power law. Taylor's power law fitted the data better than Iowa's model. Based on both regression models, the field dispersion patterns of D. citri nymphs and adults were aggregated among flush shoots in individual trees as indicated by the regression slopes that were significantly >1. For the average density of each life stage obtained during our surveys, the minimum number of flush shoots per tree needed to estimate D. citri densities varied from eight for eggs to four flush shoots for adults. Projections indicated that a sampling plan consisting of 10 trees and eight flush shoots per tree would provide density estimates of the three developmental stages of D. citri acceptable enough for population studies and management decisions. A presence-absence sampling plan with a fixed precision level was developed and can be used to provide a quick estimation of D. citri populations in citrus orchards.

  11. 78 FR 75843 - Pacific Halibut Fisheries; Catch Sharing Plan for Guided Sport and Commercial Fisheries in Alaska

    Science.gov (United States)

    2013-12-12

    ... balance the differing needs of the charter and commercial sectors over a wide range of halibut abundance... Plan for Guided Sport and Commercial Fisheries in Alaska; Final Rule #0;#0;Federal Register / Vol. 78... and Commercial Fisheries in Alaska AGENCY: National Marine Fisheries Service (NMFS), National Oceanic...

  12. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2000-01-01

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  13. Assumption-Based Planning; A Planning Tool for Very Uncertain Times

    Science.gov (United States)

    1993-01-01

    Ansoff , Igor H,, "Conceptual Underpinnings of Systematic Strategic Management," European Journal of Operational Research, Vol. 1, 1985, pp. 2-19...2Ansoff, Igor fI., *Conceptual Underpinnings of Systematic Strategic Management," European Journal ofOperational Resarch, Vol. 1, 1995, pp. 2-19. 72

  14. Optimal sampling plan for clean development mechanism lighting projects with lamp population decay

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2014-01-01

    Highlights: • A metering cost minimisation model is built with the lamp population decay to optimise CDM lighting projects sampling plan. • The model minimises the total metering cost and optimise the annual sample size during the crediting period. • The required 90/10 criterion sampling accuracy is satisfied for each CDM monitoring report. - Abstract: This paper proposes a metering cost minimisation model that minimises metering cost under the constraints of sampling accuracy requirement for clean development mechanism (CDM) energy efficiency (EE) lighting project. Usually small scale (SSC) CDM EE lighting projects expect a crediting period of 10 years given that the lighting population will decay as time goes by. The SSC CDM sampling guideline requires that the monitored key parameters for the carbon emission reduction quantification must satisfy the sampling accuracy of 90% confidence and 10% precision, known as the 90/10 criterion. For the existing registered CDM lighting projects, sample sizes are either decided by professional judgment or by rule-of-thumb without considering any optimisation. Lighting samples are randomly selected and their energy consumptions are monitored continuously by power meters. In this study, the sampling size determination problem is formulated as a metering cost minimisation model by incorporating a linear lighting decay model as given by the CDM guideline AMS-II.J. The 90/10 criterion is formulated as constraints to the metering cost minimisation problem. Optimal solutions to the problem minimise the metering cost whilst satisfying the 90/10 criterion for each reporting period. The proposed metering cost minimisation model is applicable to other CDM lighting projects with different population decay characteristics as well

  15. Proceedings of the second international conference on environmental impact assessment of all economical activities. Vol. 3

    International Nuclear Information System (INIS)

    1993-01-01

    Proceedings of the conference consist of 3 volumes: Vol. 1 - 'Environmental Impact Assessment of all Economical Activities including Industry'; Vol. 2 - 'Air Pollution Control and Prevention'; Vol. 3 - Waste Management and Environmental Problems in Construction Industry'. Out of 39 papers contained in Vol. 3, 3 were inputted to INIS. They deal with the use of portable radioisotope X-ray fluorescence analyzers in the determination of building material contamination by toxic elements, with underground waste repositories and ground water contamination, and the impact of the Temelin nuclear power plant on the hydrosphere and other environmental components. (Z.S.)

  16. AJESMS_ Vol 8 2010 August 15 2011

    African Journals Online (AJOL)

    Prof. Mereku

    2010-08-15

    Aug 15, 2010 ... African Journal of Educational Studies in Mathematics and Sciences Vol. 8, 2010 ... environs, a mining area in Wassa West District of Ghana .... This finding is based on autopsy data and on reports showing that blood levels in.

  17. Water SA - Vol 30, No 3 (2004)

    African Journals Online (AJOL)

    Application of a residential end-use model for estimating cold and hot water demand ... of multistage filtration using different filter media against conventional water ... (Germs et al., 2004), published in the April 2004 (Vol 30 No 2) issue of Water ...

  18. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

    1992-02-01

    This field sampling and analysis (S ampersand A) plan has been developed as part of the Department of Energy's (DOE's) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S ampersand A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S ampersand A plan; the scope and implementation of the first 2 years of effort of the S ampersand A plan and includes recent information about contaminants of concern, organization of S ampersand A activities, interactions with other programs, and quality assurance specific to the S ampersand A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan

  19. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  20. Sampling and analysis plan for sampling of liquid waste streams generated by 222-S Laboratory Complex operations

    International Nuclear Information System (INIS)

    Benally, A.B.

    1997-01-01

    This Sampling and Analysis Plan (SAP) establishes the requirements and guidelines to be used by the Waste Management Federal Services of Hanford, Inc. personnel in characterizing liquid waste generated at the 222-S Laboratory Complex. The characterization process to verify the accuracy of process knowledge used for designation and subsequent management of wastes consists of three steps: to prepare the technical rationale and the appendix in accordance with the steps outlined in this SAP; to implement the SAP by sampling and analyzing the requested waste streams; and to compile the report and evaluate the findings to the objectives of this SAP. This SAP applies to portions of the 222-S Laboratory Complex defined as Generator under the Resource Conservation and Recovery Act (RCRA). Any portion of the 222-S Laboratory Complex that is defined or permitted under RCRA as a treatment, storage, or disposal (TSD) facility is excluded from this document. This SAP applies to the liquid waste generated in the 222-S Laboratory Complex. Because the analytical data obtained will be used to manage waste properly, including waste compatibility and waste designation, this SAP will provide directions for obtaining and maintaining the information as required by WAC173-303

  1. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104. Revision 1

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophenoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  2. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  3. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  4. Gender and Behaviour - Vol 5, No 2 (2007)

    African Journals Online (AJOL)

    Gender and Behaviour. ... Gender and Behaviour - Vol 5, No 2 (2007) ... Home Type, Age and Gender on The Antisocial Behaviour of Secondary School Students. ... Gender-Wise Comparison on Emotional Intelligence and Marital Satisfaction.

  5. Afican Health Sciences Vol 10 No 4.pmd

    African Journals Online (AJOL)

    Administrator

    African Health Sciences Vol 10 No 4 December 2010. 353. Effect of ... Key words: Rumex steudelii, Antifertility, Folliculogenesis, Endometrium, uterus, ovary, ovarian follicles, corpus luteum,. Rats. ..... first cycle in intrauterine growth-related and.

  6. Preliminary evaluation of rotational Vol-oxidizer for hot cell operation - 5320

    International Nuclear Information System (INIS)

    Kim, Y.H.; Lee, J.W.; Cho, Y.Z.; Ahn, D.H.; Song, K.C.

    2015-01-01

    KAERI is developing a mechanical head-end process for pyro-processing. As a piece of the processing equipment, a vol-oxidizer that can handle several tens of kg of HM/batch is under development to supply U 3 O 8 powders to an electrolytic reduction (ER) reactor. To operate a vol-oxidizer in a hot cell, the reactor should be optimized by the mechanical design, and the vol-oxidizer should have a high hull recovery rate. In addition, a vol-oxidizer for hot cell demonstrations that handles the spent fuel of high radiation virulence in a limited space should have a small size and not scatter in its outlet. In this paper, we aim at a preliminary evaluation of a rotational vol-oxidizer for hot cell operation. To evaluate the preliminary situation, we produced a theoretical equation of an optimum reactor size, and verification tests were conducted using an acryl vessel and zircaloy-4 tube according to various weights and lengths. In addition, we predicted the terminal velocity of U 3 O 8 using the terminal velocity of SiO 2 , which will determine the optimum air flux, and through an oxidation experiment, we verified the theory form to detect the existence of U 3 O 8 powder in a discharge filter. In addition, hull separation tests were conducted using a reactor and hulls with a 50 kg HM/batch for the recovery rate of the hulls. The results indicate that we obtained an appropriate air flux so as to not cause U 3 O 8 powder dispersion from using a Stokes equation and density ratio equation prior to the demonstration. The optimum flow and experimental results of the hull separation test have been applied for the design of the demonstration oxidizer, and the operation conditions of the oxidizer were produced. (authors)

  7. Joyo progress report, vol. 8

    International Nuclear Information System (INIS)

    1983-01-01

    Following Joyo Reactor Technology Progress Reports (Vol. 1 to Vol. 7), the name was changed to Joyo Progress Report from this volume, and the activities concerning the fast breeder experimental reactor Joyo as a whole are to be reported as quarterly report. In the fast breeder experimental reactor Joyo, the change to the core for irradiation (MK-2) from the core for breeding (MK-1) was carried out since January, 1982, in order to utilize the reactor as an irradiation facility for the development of fuel and materials. The main work was the construction of the core for irradiation by exchanging 290 fuel elements, and the exchange of upper and lower guide pipes for control rods, the reconstruction of the driving mechanism, the installation of standby neutron detector system, the acceptance and inspection of new fuel, and the transfer of spent fuel between pools were carried out. As scheduled, the core for irradiation attained the initial criticality on November 22, and the works of constructing the core were completed on December 23, 1982. Thereafter, the 100 MW performance test was begun. Various experience and valuable data were obtained in the regular inspection and the maintenance and repair works carried out at the same time, regarding the operation and maintenance of the Joyo facilities. (Kako, I.)

  8. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  9. Dosimetry of parotid glands in IMRT plan of nasopharyngeal carcinoma

    International Nuclear Information System (INIS)

    Lian Jiancheng; Yu Xinsheng; Jiang Guoliang

    2007-01-01

    Objective: To evaluate the effect of different intensity-modulated radiation therapy (IMRT) plan on the dosimetry of parotid in patients with nasopharyngeal carcinoma. Methods: Under the same constraints and objections, the IMRT plan of nasopharyngeal carcinoma with sparing unilateral parotid and the IMRT plan added plan tumor volume (PTV) margin for parotid gland was investigated. Results: Between conventional IMRT plan and the IMRT plan spared unilateral parotid, their target coverage, homogeneity index and conformal index of PTV 70 is similar. On PTV 60 , D min in the plan of sparing one parotid gland was more than that in normal IMRT plan (P 95 in the plan of sparing one parotid gland have improved (P 50%VOL and D mean of parotid gland were similar between the two plans. Between conventional IMRT plan and the IMRT plan added 2 or 3 mm margin for parotid gland, their target coverage, homogeneity index and conformal index of PTV 70 is similar. D min , D mean and D 95 of PTV 60 have decreased tendency from normal IMRT plan to 2 mm margin plan to 3 mm margin plan. D max of brainstem and spine cord have increased tendency from normal IMRT plan to 2 mm margin plan to 3 mm margin plan. Conclusions: The IMRT plan of nasopharyngeal carcinoma with sparing unilateral parotid may be adopted not to protect both two parotids, while PTV margin for parotid added as parotid move. (authors)

  10. Tanzania Veterinary Journal - Vol 32, No 1 (2017)

    African Journals Online (AJOL)

    Tanzania Veterinary Journal - Vol 32, No 1 (2017) ... factors for porcine cysticercosis transmission and animal welfare in selected villages in Nyasa, Tanzania ... Thoracic radiographic anatomy in sheep · EMAIL FULL TEXT EMAIL FULL TEXT

  11. African Research Review - Vol 5, No 1 (2011)

    African Journals Online (AJOL)

    African Research Review - Vol 5, No 1 (2011) .... Gender and Occupational Preferences among Senior High School Students in Cross River State ... Academic Achievement in Physics · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  12. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  13. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  14. Forecasting the Number of Soil Samples Required to Reduce Remediation Cost Uncertainty

    OpenAIRE

    Demougeot-Renard, Hélène; de Fouquet, Chantal; Renard, Philippe

    2008-01-01

    Sampling scheme design is an important step in the management of polluted sites. It largely controls the accuracy of remediation cost estimates. In practice, however, sampling is seldom designed to comply with a given level of remediation cost uncertainty. In this paper, we present a new technique that allows one to estimate of the number of samples that should be taken at a given stage of investigation to reach a forecasted level of accuracy. The uncertainty is expressed both in terms of vol...

  15. GLOBAL JOURNAL OF SOCIAL SCIENCES VOL 8, NO

    African Journals Online (AJOL)

    Ada

    GLOBAL JOURNAL OF SOCIAL SCIENCES VOL 8, NO. ... media. From the over fifty tertiary institutions in the country graduates are churned .... few were collected at the contact addresses, ... acquisition is paramount for successful job hunting.

  16. AFRREV STECH, Vol. 3(1) February, 2014

    African Journals Online (AJOL)

    Toshiba

    Indexed African Journals Online: www.ajol.info. AFRREV STECH. An International Journal of Science and Technology. Bahir Dar, Ethiopia. Vol. 3 (1), S/No 6, February, 2014: 1-11. ISSN 2225-8612 (Print) ISSN 2227-5444 (Online). EFFECTS OF DEFORESTATION ON NATURAL. BIO-DIVERSITY IN DELTA NORTH ...

  17. Engineering task plan for development, fabrication, and deployment of nested, fixed depth fluidic sampling and at-tank analysis systems

    International Nuclear Information System (INIS)

    REICH, F.R.

    1999-01-01

    An engineering task plan was developed that presents the resources, responsibilities, and schedules for the development, test, and deployment of the nested, fixed-depth fluidic sampling and at-tank analysis system. The sampling system, deployed in the privatization contract double-shell tank feed tank, will provide waste samples for assuring the readiness of the tank for shipment to the privatization contractor for vitrification. The at-tank analysis system will provide ''real-time'' assessments of the sampled wastes' chemical and physical properties. These systems support the Hanford Phase 1B Privatization Contract

  18. African Health Sciences - Vol 15, No 4 (2015)

    African Journals Online (AJOL)

    African Health Sciences. ... African Health Sciences - Vol 15, No 4 (2015) .... H Madubedube, Andre P Kengne, Rajiv T Erasmus, Tahir S Pillay, Tandi E ... on lung function and cardiorespiratory fitness in both cigarette and hookah smokers.

  19. Determination of acrolein, ethanol, volatile acidity, and copper in different samples of sugarcane spirits Determinação de acroleína, etanol, acidez volátil e cobre em diferentes amostras de aguardentes de cana

    Directory of Open Access Journals (Sweden)

    José Masson

    2012-09-01

    Full Text Available Seventy-one samples of sugarcane spirits from small and average size stills produced in the northern and southern Minas Gerais (Brazil were analyzed for acrolein using HPLC (High Performance Liquid Chromatography. Ethanol and copper concentrations and volatile acidity were also determined according to methods established by the Ministry of Agriculture, Livestock and Supply (MAPA. A total of 9.85% of the samples tested showed levels of acrolein above the legal limits, while the copper concentrations of 21.00% of the samples and the volatile acidity of 8.85% of the samples were higher than the limits established by the Brazilian legislation. The concentration of acrolein varied from 0 to 21.97 mg.100 mL-1 of ethanol. However, no significant difference at 5% of significance was observed between the samples produced in the northern and southern Minas Gerais. The method used for determination of acrolein in sugarcane spirits involved the formation of a derivative with 2,4-dinitrophenylhydrazine (2,4-DNPH and subsequent analysis by HPLC.As setenta e uma amostras de aguardentes de cana coletadas em alambiques de pequeno e médio porte, provenientes das regiões norte e sul de Minas Gerais, foram avaliadas por CLAE (Cromatografia Líquida de Alta Eficiência quanto ao teor de acroleína. Avaliaram-se também as concentrações de etanol, acidez volátil e cobre, utilizando-se as metodologias estabelecidas pelo Ministério da Agricultura, Pecuária e Abastecimento (MAPA. Do total de amostras, 9,85% apresentaram níveis de acroleína acima do limite legal, 21,00% apresentaram teores de cobre e 8,85% de acidez volátil acima dos limites estabelecidos pela legislação brasileira. Os teores de acroleína variaram de 0 a 21,97 mg.100 mL-1 de etanol. Entretanto, não ocorreu diferença significativa no nível de 5% de significância entre as amostras do norte e as do sul de Minas Gerais. O método aplicado para a determinação de acroleína em aguardente de

  20. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Energy Systems to prepare a Phase II Sampling Plan to describe the field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of the Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to the applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures

  1. Treatment planning for MLC based robotic radiosurgery for brain metastases: plan comparison with circular fields and suggestions for planning strategies

    Directory of Open Access Journals (Sweden)

    Schmitt Daniela

    2017-09-01

    Full Text Available To evaluate the possible range of application of the new InCise2 MLC for the CyberKnife M6 system in brain radiosurgery, a plan comparison was made for 10 brain metastases sized between 1.5 and 9cm3 in 10 patients treated in a single fraction each. The target volumes consist of a PTV derived by expanding the GTV by 1mm and were chosen to have diversity in the cohort regarding regularity of shape, location and the structures needed to be blocked for beam transmission in the vicinity. For each case, two treatment plans were optimized: one using the MLC and one using the IRIS-collimator providing variable circular fields. Plan re-quirements were: dose prescription to the 70% isodose line (18 or 20Gy, 100% GTV coverage, ≥98% PTV coverage, undisturbed central high dose region (95% of maximum dose and a conformity index as low as possible. Plan com-parison parameters were: conformity index (CI, high-dose gradient index (GIH, low-dose gradient index (GIL, total number of monitor units (MU and expected treatment time (TT. For all cases, clinically acceptable plans could be gen-erated with the following results (mean±SD for CI, GIH, GIL, MU and TT, respectively for the MLC plans: 1.09±0.03, 2.77±0.26, 2.61±0.08, 4514±830MU and 27±5min and for the IRIS plans: 1.05±0.01, 3.00±0.35, 2.46±0.08, 8557±1335MU and 42±7min. In summary, the MLC plans were on average less conformal and had a shallower dose gradient in the low dose region, but a steeper dose gradient in the high dose region. This is accompanied by a smaller vol-ume receiving 10Gy. A plan by plan comparison shows that usage of the MLC can spare about one half of the MUs and one third of treatment time. From these experiences and results suggestions for MLC planning strategy can be de-duced.

  2. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  3. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  4. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field

  5. Measurement of radioactivity in the environment - Soil - Part 2: Guidance for the selection of the sampling strategy, sampling and pre-treatment of samples

    International Nuclear Information System (INIS)

    2007-01-01

    This part of ISO 18589 specifies the general requirements, based on ISO 11074 and ISO/IEC 17025, for all steps in the planning (desk study and area reconnaissance) of the sampling and the preparation of samples for testing. It includes the selection of the sampling strategy, the outline of the sampling plan, the presentation of general sampling methods and equipment, as well as the methodology of the pre-treatment of samples adapted to the measurements of the activity of radionuclides in soil. This part of ISO 18589 is addressed to the people responsible for determining the radioactivity present in soil for the purpose of radiation protection. It is applicable to soil from gardens, farmland, urban or industrial sites, as well as soil not affected by human activities. This part of ISO 18589 is applicable to all laboratories regardless of the number of personnel or the range of the testing performed. When a laboratory does not undertake one or more of the activities covered by this part of ISO 18589, such as planning, sampling or testing, the corresponding requirements do not apply. Information is provided on scope, normative references, terms and definitions and symbols, principle, sampling strategy, sampling plan, sampling process, pre-treatment of samples and recorded information. Five annexes inform about selection of the sampling strategy according to the objectives and the radiological characterization of the site and sampling areas, diagram of the evolution of the sample characteristics from the sampling site to the laboratory, example of sampling plan for a site divided in three sampling areas, example of a sampling record for a single/composite sample and example for a sample record for a soil profile with soil description. A bibliography is provided

  6. African Health Sciences - Vol 13, No 2 (2013)

    African Journals Online (AJOL)

    African Health Sciences. ... African Health Sciences - Vol 13, No 2 (2013) ... S Musisi, D Akena, E Nakimuli-Mpungu, C Abbo, J Okello, 205-218 .... Alcohol consumption and cigarette smoking pattern among brothelbased female sex workers in ...

  7. Initial analysis and curation plans for MUSES-C asteroidal samples

    Science.gov (United States)

    Yano, H.; Kushiro, I.; Fujiwara, A.

    that there are a few more areas of expertise still lacked within the recommended members. Thus, the competition shall be repeated one or two more times (in early 2003 after the launch, and possibly in 2005 after in-situ data is obtained) in order to collect the best Japanese experts in the whole range of different types of analyses at the time of the sample return. The final members of the MASPET will be appointed about 2 years prior to the Earth return. Then they will conduct a Stest runT of the whole initial analysis procedures at the ISAS asteromaterial curation facility, to be newly created in next a few years, and their respective analysis facilities. This talk also covers the current concepts of the facility and plans of analysis procedure flow.

  8. Sampling Based Trajectory Planning for Robots in Dynamic Human Environments

    DEFF Research Database (Denmark)

    Svenstrup, Mikael

    2010-01-01

    Open-ended human environments, such as pedestrian streets, hospital corridors, train stations etc., are places where robots start to emerge. Hence, being able to plan safe and natural trajectories in these dynamic environments is an important skill for future generations of robots. In this work...... the problem is formulated as planning a minimal cost trajectory through a potential field, defined from the perceived position and motion of persons in the environment. A modified Rapidlyexploring Random Tree (RRT) algorithm is proposed as a solution to the planning problem. The algorithm implements a new...... for the uncertainty in the dynamic environment. The planning algorithm is demonstrated in a simulated pedestrian street environment....

  9. AJESMS Vol 9 2011 October 23 2012 final

    African Journals Online (AJOL)

    Owner

    2011-10-23

    Oct 23, 2011 ... African Journal of Educational Studies in Mathematics and Sciences Vol. ... alveolar re-circulation and gravity orientation are key factors in determining the ..... Comp. Biomed. Res. 3, pp 675-689. Pich, J. (1972). Theory of ...

  10. African Research Review - Vol 4, No 4 (2010)

    African Journals Online (AJOL)

    African Research Review - Vol 4, No 4 (2010) .... Educational Policy and Technological Development in Africa: An X-Ray of Problems and Solutions in the .... Tradition and Art Appreciation: A Boost to Cultural Tourism in Nigeria · EMAIL FREE ...

  11. Editorial - International Journal of Sustainable Energy Planning and Management Vol 9

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2016-06-01

    Full Text Available This editorial introduces the ninth volume of the International Journal of Sustainable Energy Planning and Management. The volume addresses alternative ways of providing diesel fuel through emulsification ow waste cooking oil and fat, estimation of global solar energy potentials based on publically available data, and a large review of global grid connected electricity storage systems. Finally, an article applies stochastic programming to analyse optimal district heating expansion scenarios with particular focus on the phasing issue of investments in district heating grids.

  12. Sampling and analysis plan for the preoperational environmental survey for the immobilized low activity waste (ILAW) project W-465

    International Nuclear Information System (INIS)

    Mitchell, R.M.

    1998-01-01

    This document provides a detailed description of the Sampling and Analysis Plan for the Preoperational Survey to be conducted at the Immobilized Low Activity Waste (ILAW) Project Site in the 200 East Area

  13. Measuring attachment to life in old age: the Portuguese version of the Positive Valuation of Life Scale (Positive VOL).

    Science.gov (United States)

    Araújo, Lia; Ribeiro, Oscar; Teixeira, Laetitia; Azevedo, Maria João; Jopp, Daniela S; Rott, Christoph; Paúl, Constança

    2015-10-01

    This study aims to present the psychometric properties of the Portuguese version of the Positive Valuation of Life Scale (Lawton et al. in J Aging Ment Healt 13:3-31, 2001). Sample included 207 community-dwelling elders (129 women; M Age = 77.2 years, SD = 7.5). The data collection included the translated and adapted Portuguese version of Positive Valuation of Life Scale, Life Satisfaction Index Z, Meaning in Life Questionnaire and Geriatric Depression Scale. From exploratory factor analysis, two factors emerged, existential beliefs and perceived control, explaining 49 % of the total variance. Both factors were positively related with meaning in life and life satisfaction and negatively related with depression (p 0.75). The Portuguese version of Positive VOL Scale represents a reliable and valid measure to capture the subjective experience of attachment to one's life. The two-factor structure is an update to Lawton's previous work and in line with findings obtained in the USA (Dennis et al. in What is valuation of life for frail community-dwelling older adults: factor structure and criterion validity of the VOL, Thomas Jefferson University, Center for Applied Research on Aging and Health Research, 2005) and Japan (Nakagawa et al. in Shinrigaku Kenkyu 84:37-46, 2013). Future research is required to investigate VOL predictors and the potential changes toward the end of the life span.

  14. Physics at LEP2. Vol. 2

    International Nuclear Information System (INIS)

    Altarelli, G.; Sjoestrand, T.; Zwirner, F.

    1995-01-01

    This is final report of the Workshop on Physics at LEP2, held at CERN during 1995. The first part of vol. 1 is devoted to aspects of machine physics of particular relevance to experiments, including the energy, luminosity and interaction regions, as well as the measurement of beam energy. The second part of vol. 1 is a relatively concise, but fairly complete, handbook on the physics of e + e - annihilation above the WW threshold and up to √s∼200 GeV. It contains discussions on WW cross-sections and distributions, W mass determination, Standard Model processes, QCD and gamma-gamma physics, as well as aspects of discovery physics, such as Higgs, new particle searches, triple gauge boson couplings and Z'. The second volume contains a review of the existing Monte Carlo generators for LEP2 physics. These include generators for WW physics, QCD and gamma-gamma processes, Bhabha scattering and discovery physics. A special effort was made to co-ordinate the different parts, with a view to achieving a systematic and balanced review of the subject, rather than just publishing a collection of separate contributions. (orig.)

  15. Physics at LEP2. Vol. 1

    International Nuclear Information System (INIS)

    Altarelli, G.; Sjoestrand, T.; Zwirner, F.

    1996-01-01

    This is the final report of the Workshop on Physics at LEP2, held at CERN during 1995. The first part of vol. 1 is devoted to aspects of machine physics of particular relevance to experiments, including the energy, luminosity and interaction regions, as well as the measurement of beam energy. The second part of vol. 1 is a relatively concise, but fairly complete, handbook on the physics of e + e - annihilation above the WW threshold and up to √s∼200 GeV. It contains discussions on WW cross-sections and distributions, W mass determination, Standard Model processes, QCD and gamma-gamma physics, as well as aspects of discovery physics, such as Higgs, new particle searches, triple gauge boson couplings and Z'. The second volume contains a review of the existing Monte Carlo generators for LEP2 physics. These include generators for WW physics, QCD and gamma-gamma processes, Bhabha scattering and discovery physics. A special effort was made to co-ordinate the different parts, with a view to achieving a systematic and balanced review of the subject, rather than just publishing a collection of separate contributions. (orig.)

  16. Physics at LEP2. Vol. 2

    Energy Technology Data Exchange (ETDEWEB)

    Altarelli, G [ed.; Sjoestrand, T [ed.; Zwirner, F [ed.

    1995-02-19

    This is final report of the Workshop on Physics at LEP2, held at CERN during 1995. The first part of vol. 1 is devoted to aspects of machine physics of particular relevance to experiments, including the energy, luminosity and interaction regions, as well as the measurement of beam energy. The second part of vol. 1 is a relatively concise, but fairly complete, handbook on the physics of e{sup +}e{sup -} annihilation above the WW threshold and up to {radical}s{approx}200 GeV. It contains discussions on WW cross-sections and distributions, W mass determination, Standard Model processes, QCD and gamma-gamma physics, as well as aspects of discovery physics, such as Higgs, new particle searches, triple gauge boson couplings and Z`. The second volume contains a review of the existing Monte Carlo generators for LEP2 physics. These include generators for WW physics, QCD and gamma-gamma processes, Bhabha scattering and discovery physics. A special effort was made to co-ordinate the different parts, with a view to achieving a systematic and balanced review of the subject, rather than just publishing a collection of separate contributions. (orig.).

  17. Meteorological monitoring sampling and analysis plan for the environmental monitoring plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses meteorological monitoring activities that wall be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. Meteorological monitoring of various climatological parameters (e.g., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model

  18. Handbook on criticality. Vol. 1. Criticality and nuclear safety; Handbuch zur Kritikalitaet. Bd. 1. Kritikalitaet und nukleare Sicherheit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-04-15

    This handbook was prepared primarily with the aim to provide information to experts in industry, authorities or research facilities engaged in criticality-safety-related problems that will allow an adequate and rapid assessment of criticality safety issues already in the planning and preparation of nuclear facilities. However, it is not the intention of the authors of the handbook to offer ready solutions to complex problems of nuclear safety. Such questions have to remain subject to an in-depth analysis and assessment to be carried out by dedicated criticality safety experts. Compared with the previous edition dated December 1998, this handbook has been further revised and supplemented. The proven basic structure of the handbook remains unchanged. The handbook follows in some ways similar criticality handbooks or instructions published in the USA, UK, France, Japan and the former Soviet Union. The expedient use of the information given in this handbook requires a fundamental understanding of criticality and the terminology of nuclear safety. In Vol. 1, ''Criticality and Nuclear Safety'', therefore, first the most important terms and fundamentals are introduced and explained. Subsequently, experimental techniques and calculation methods for evaluating criticality problems are presented. The following chapters of Vol. 1 deal i. a. with the effect of neutron reflectors and absorbers, neutron interaction, measuring methods for criticality, and organisational safety measures and provide an overview of criticality-relevant operational experience and of criticality accidents and their potential hazardous impact. Vol. 2 parts 1 and 2 finally compile criticality parameters in graphical and tabular form. The individual graph sheets are provided with an initially explained set of identifiers, to allow the quick finding of the information of current interest. Part 1 includes criticality parameters for systems with {sup 235}U as fissile material, while part

  19. Afican Health Sciences Vol 9 No 2.pmd

    African Journals Online (AJOL)

    Administrator

    African Health Sciences Vol 9 No 2 June 2009 ... Background:The under five mortality rate (U5MR) is measure of wellbeing and decreasing the U5MR by two .... under three scenarios 1-3. ... Negative indicates increase in childhood mortalities.

  20. Seasonal phenology, spatial distribution, and sampling plan for the invasive mealybug Phenacoccus peruvianus (Hemiptera: Pseudococcidae).

    Science.gov (United States)

    Beltrá, A; Garcia-Marí, F; Soto, A

    2013-06-01

    Phlenacoccus peruvianus Granara de Willink (Hemiptera: Pseudococcidae) is an invasive mealybug of Neotropical origin. In recent years it has invaded the Mediterranean Basin causing significant damages in bougainvillea and other ornamental plants. This article examines its phenology, location on the plant and spatial distribution, and presents a sampling plan to determine P. peruvianus population density for the management of this mealybug in southern Europe. Six urban green spaces with bougainvillea plants were periodically surveyed between March 2008 and September 2010 in eastern Spain, sampling bracts, leaves, and twigs. Our results show that P. peruvianus abundance was high in spring and summer, declining to almost undetectable levels in autumn and winter. The mealybugs showed a preference for settling on bracts and there were no significant migrations between plant organs. P. peruvianus showed a highly aggregated distribution on bracts, leaves, and twigs. We recommend abinomial sampling of 200 leaves and an action threshold of 55% infested leaves for integrated pest management purposes on urban landscapes and enumerative sampling for ornamental nursery management and additional biological studies.

  1. Corganiser: a web-based software tool for planning time-sensitive sampling of whole rounds during scientific drilling

    DEFF Research Database (Denmark)

    Marshall, Ian

    2014-01-01

    with a wide range of core and section configurations and can thus be used in future drilling projects. Corganiser is written in the Python programming language and is implemented both as a graphical web interface and command-line interface. It can be accessed online at http://130.226.247.137/.......Corganiser is a software tool developed to simplify the process of preparing whole-round sampling plans for time-sensitive microbiology and geochemistry sampling during scientific drilling. It was developed during the Integrated Ocean Drilling Program (IODP) Expedition 347, but is designed to work...

  2. A binary logistic regression model with complex sampling design of unmet need for family planning among all women aged (15-49) in Ethiopia.

    Science.gov (United States)

    Workie, Demeke Lakew; Zike, Dereje Tesfaye; Fenta, Haile Mekonnen; Mekonnen, Mulusew Admasu

    2017-09-01

    Unintended pregnancy related to unmet need is a worldwide problem that affects societies. The main objective of this study was to identify the prevalence and determinants of unmet need for family planning among women aged (15-49) in Ethiopia. The Performance Monitoring and Accountability2020/Ethiopia was conducted in April 2016 at round-4 from 7494 women with two-stage-stratified sampling. Bi-variable and multi-variable binary logistic regression model with complex sampling design was fitted. The prevalence of unmet-need for family planning was 16.2% in Ethiopia. Women between the age range of 15-24 years were 2.266 times more likely to have unmet need family planning compared to above 35 years. Women who were currently married were about 8 times more likely to have unmet need family planning compared to never married women. Women who had no under-five child were 0.125 times less likely to have unmet need family planning compared to those who had more than two-under-5. The key determinants of unmet need family planning in Ethiopia were residence, age, marital-status, education, household members, birth-events and number of under-5 children. Thus the Government of Ethiopia would take immediate steps to address the causes of high unmet need for family planning among women.

  3. Sampling and Analysis Plan for Release of the 105-C Below-Grade Structures and Underlying Soils

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1998-02-01

    This sampling and analysis plan (SAP) presents the rationale and strategies for the sampling, field measurements, and analyses of the below-grade concrete structures from the Hanford 105-C Reactor Building and the underlying soils consistent with the land-use assumptions in the Record of Decision for the U.S. Department of Energy 100-BC-1, 100-DR-1, and 100-HR-1 Operable Units (ROD) (EPA 1995). This structure is one of nine surplus production reactors in the 100 Area of the Hanford Site. This SAP is based on the data quality objectives developed for the 105-C below-grade structures and underlying soils (BHI 1997)

  4. Planning for the Collection and Analysis of Samples of Martian Granular Materials Potentially to be Returned by Mars Sample Return

    Science.gov (United States)

    Carrier, B. L.; Beaty, D. W.

    2017-12-01

    NASA's Mars 2020 rover is scheduled to land on Mars in 2021 and will be equipped with a sampling system capable of collecting rock cores, as well as a specialized drill bit for collecting unconsolidated granular material. A key mission objective is to collect a set of samples that have enough scientific merit to justify returning to Earth. In the case of granular materials, we would like to catalyze community discussion on what we would do with these samples if they arrived in our laboratories, as input to decision-making related to sampling the regolith. Numerous scientific objectives have been identified which could be achieved or significantly advanced via the analysis of martian rocks, "regolith," and gas samples. The term "regolith" has more than one definition, including one that is general and one that is much more specific. For the purpose of this analysis we use the term "granular materials" to encompass the most general meaning and restrict "regolith" to a subset of that. Our working taxonomy includes the following: 1) globally sourced airfall dust (dust); 2) saltation-sized particles (sand); 3) locally sourced decomposed rock (regolith); 4) crater ejecta (ejecta); and, 5) other. Analysis of martian granular materials could serve to advance our understanding areas including habitability and astrobiology, surface-atmosphere interactions, chemistry, mineralogy, geology and environmental processes. Results of these analyses would also provide input into planning for future human exploration of Mars, elucidating possible health and mechanical hazards caused by the martian surface material, as well as providing valuable information regarding available resources for ISRU and civil engineering purposes. Results would also be relevant to matters of planetary protection and ground-truthing orbital observations. We will present a preliminary analysis of the following, in order to generate community discussion and feedback on all issues relating to: What are the

  5. Southern African Business Review - Vol 21, No 1 (2017)

    African Journals Online (AJOL)

    Southern African Business Review - Vol 21, No 1 (2017) ... Pre-packaged applications in business reorganisations: International principles · EMAIL ... Microcredit supply under Islamic Banking in Khartoum State, Sudan · EMAIL FREE FULL ...

  6. Environmental mining plan of the construction materials industry in Cartagena, Phase 1 Diagnostic. Vol.1 and Vol.2(Annex); Plan de manejo minero ambiental de la industria extractiva de materiales de construccion en Cartagena Fase 1 Diagnostico. Vol.1 y Vol.2(Anexo)

    Energy Technology Data Exchange (ETDEWEB)

    Castiblanco, Carmen Rosa; Franco Serna, Jose Vicente; Nino, Jaime

    1996-07-01

    INGEOMINAS carried out this project in the cities of Cartagena, Bucaramanga, Cali and Bogota, in two phases: Phase 1 (Diagnostic) and Phase II (Formulation of Handling Plan). The phase 1 that here is described, it upgrades the knowledge of the extractive industry of the construction materials for the city of Cartagena, through bibliographical revision and field work, carried out in 50 quarries that supply from these materials to the city. This study, besides the economic and legal handling, identifies technical aspects related with the geology, the mining and the environmental situation. In accordance with their likeness, geologic, morphological and of exploitation (extraction methods and mining development), the quarries met in five groups: Exploitations on calcareous deposits of the La Popa Formation, exploitations on clay deposits of the La Popa Formation, exploitations on detritus deposits of half grain to thick (La Popa-Arenosa Formation; Pendales Conglomerate and Rotinet Formation) and exploitation of calcareous of the Arroyo de Piedra Formation. The extraction of these materials is characterized by its low degree of development technician, lack of planning mining, lack of appropriate infrastructure that allows a better development of the sector, is also evident the control lack on the part of the entities in charge of the handling of this industry. These factors added to a demand every time in increase of these materials, they have taken to a progressive deterioration in the landscape, increase of the noise and particles in the air and in the waters. The low control in this activity has generated the proliferation of informal exploitations that they find in this activity a way of subsistence.

  7. Journal of Applied Sciences and Environmental Management - Vol ...

    African Journals Online (AJOL)

    Journal of Applied Sciences and Environmental Management. ... AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search · USING ... Journal of Applied Sciences and Environmental Management - Vol 22, No 5 (2018) .... Growth Performance of Five Bean (Phaseolus spp) Varieties as Influenced by Organic ...

  8. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental, LLC

    2011-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding

  9. Assessment of heavy metal pollution in soils along major roadside ...

    African Journals Online (AJOL)

    EJIRO

    African Journal of Environmental Science and Technology Vol. 5(3), pp ... of Agricultural Engineering and Land Planning, Botswana College of Agriculture, Private Bag 0027, .... Collected soil samples were air-dried to constant weight and then ...

  10. AJESMS_ Vol 8 2010 August 15 2011

    African Journals Online (AJOL)

    Prof. Mereku

    2010-08-15

    Aug 15, 2010 ... African Journal of Educational Studies in Mathematics and Sciences Vol. ... girls from two Senior High Schools in Accra, the capital of Ghana in West Africa. .... On the face of it, the Brazilian and Swedish children might seem to have the ... The two profile dimensions that have been specified for teaching, ...

  11. Sampling and analysis plan for the 116-C-5 retention basins characteristic dangerous waste determination

    International Nuclear Information System (INIS)

    Bauer, R.G.; Dunks, K.L.

    1996-03-01

    Cooling water flow from the rear face of the 100-B and 100-C reactors was diverted to large retention basins prior to discharge to the Columbia River. These retention basins delayed the release of the reactor coolant for decay of the short-lived activation products and for thermal cooling. Some of the activation products were deposited in sludge that settled in the basins and discharge lines. In addition, some contamination was deposited in soil around the basins and associated piping. The sampling objective of this project is to determine if regulated levels of leachable lead are present in the abrasive materials used to decontaminate the retention basin tank walls, in the material between the tank base plate and the concrete foundation, and in the soils immediately surrounding the perimeter of the retention basins. Sampling details, including sampling locations, frequencies, and analytical requirements, are discussed. Also described is the quality assurance plan for this project

  12. Editorial - International Journal of Sustainable Energy Planning and Management Vol 6

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2015-06-01

    Full Text Available This editorial introduces the sixth volume of the International Journal of Sustainable Energy Planning and Management. Topics include methodology for assessing solar power and solar heat potentials using geographical information systems using Swiss cases, a similar analysis focusing on solar power in Kenya and the spatio-temporal distribution of the production, and the establishment of the correct economic framework conditions or incentives to promote changes towards renewable energy systems taking a Danish community as a case. Lastly, an article investigates the Chinese district heating sector with a view to identifying alternatives to the present coal-based heating infrastructure.

  13. The U.S. Geological Survey Geologic Collections Management System (GCMS)—A master catalog and collections management plan for U.S. Geological Survey geologic samples and sample collections

    Science.gov (United States)

    ,

    2015-01-01

    The U.S. Geological Survey (USGS) is widely recognized in the earth science community as possessing extensive collections of earth materials collected by research personnel over the course of its history. In 2006, a Geologic Collections Inventory was conducted within the USGS Geology Discipline to determine the extent and nature of its sample collections, and in 2008, a working group was convened by the USGS National Geologic and Geophysical Data Preservation Program to examine ways in which these collections could be coordinated, cataloged, and made available to researchers both inside and outside the USGS. The charge to this working group was to evaluate the proposition of creating a Geologic Collections Management System (GCMS), a centralized database that would (1) identify all existing USGS geologic collections, regardless of size, (2) create a virtual link among the collections, and (3) provide a way for scientists and other researchers to obtain access to the samples and data in which they are interested. Additionally, the group was instructed to develop criteria for evaluating current collections and to establish an operating plan and set of standard practices for handling, identifying, and managing future sample collections. Policies and procedures promoted by the GCMS would be based on extant best practices established by the National Science Foundation and the Smithsonian Institution. The resulting report—USGS Circular 1410, “The U.S. Geological Survey Geologic Collections Management System (GCMS): A Master Catalog and Collections Management Plan for U.S. Geological Survey Geologic Samples and Sample Collections”—has been developed for sample repositories to be a guide to establishing common practices in the collection, retention, and disposal of geologic research materials throughout the USGS.

  14. Comparison and Field Validation of Binomial Sampling Plans for Oligonychus perseae (Acari: Tetranychidae) on Hass Avocado in Southern California.

    Science.gov (United States)

    Lara, Jesus R; Hoddle, Mark S

    2015-08-01

    Oligonychus perseae Tuttle, Baker, & Abatiello is a foliar pest of 'Hass' avocados [Persea americana Miller (Lauraceae)]. The recommended action threshold is 50-100 motile mites per leaf, but this count range and other ecological factors associated with O. perseae infestations limit the application of enumerative sampling plans in the field. Consequently, a comprehensive modeling approach was implemented to compare the practical application of various binomial sampling models for decision-making of O. perseae in California. An initial set of sequential binomial sampling models were developed using three mean-proportion modeling techniques (i.e., Taylor's power law, maximum likelihood, and an empirical model) in combination with two-leaf infestation tally thresholds of either one or two mites. Model performance was evaluated using a robust mite count database consisting of >20,000 Hass avocado leaves infested with varying densities of O. perseae and collected from multiple locations. Operating characteristic and average sample number results for sequential binomial models were used as the basis to develop and validate a standardized fixed-size binomial sampling model with guidelines on sample tree and leaf selection within blocks of avocado trees. This final validated model requires a leaf sampling cost of 30 leaves and takes into account the spatial dynamics of O. perseae to make reliable mite density classifications for a 50-mite action threshold. Recommendations for implementing this fixed-size binomial sampling plan to assess densities of O. perseae in commercial California avocado orchards are discussed. © The Authors 2015. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  15. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented

  16. Household waste behaviours among a community sample in Iran: an application of the theory of planned behaviour.

    Science.gov (United States)

    Pakpour, Amir H; Zeidi, Isa Mohammadi; Emamjomeh, Mohammad Mahdi; Asefzadeh, Saeed; Pearson, Heidi

    2014-06-01

    Understanding the factors influencing recycling behaviour can lead to better and more effective recycling programs in a community. The goal of this study was to examine factors associated with household waste behaviours in the context of the theory of planned behaviour (TPB) among a community sample of Iranians that included data collection at time 1 and at follow-up one year later at time 2. Study participants were sampled from households under the coverage of eight urban health centers in the city of Qazvin. Of 2000 invited households, 1782 agreed to participate in the study. A self-reported questionnaire was used for assessing socio-demographic factors and the TPB constructs (i.e. attitude, subjective norms, perceived behavioural control, and intention). Furthermore, questions regarding moral obligation, self-identity, action planning, and past recycling behaviour were asked, creating an extended TPB. At time 2, participants were asked to complete a follow-up questionnaire on self-reported recycling behaviours. All TPB constructs had positive and significant correlations with each other. Recycling behaviour at time 1 (past behaviour) significantly related to household waste behaviour at time 2. The extended TPB explained 47% of the variance in household waste behaviour at time 2. Attitude, perceived behavioural control, intention, moral obligation, self-identity, action planning, and past recycling behaviour were significant predictors of household waste behaviour at time 2 in all models. The fact that the expanded TPB constructs significantly predicted household waste behaviours holds great promise for developing effective public campaigns and behaviour-changing interventions in a region where overall rates of household waste reduction behaviours are low. Our results indicate that educational materials which target moral obligation and action planning may be particularly effective. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Journal of Applied Sciences and Environmental Management - Vol ...

    African Journals Online (AJOL)

    Journal of Applied Sciences and Environmental Management. ... AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search · USING ... Journal of Applied Sciences and Environmental Management - Vol 22, No 4 (2018) ... Evaluating the effect of mobility speed on the performance of three handover algorithms in ...

  18. Shostakovich: The Orchestral Songs Vol. 2 / Michael Tanner

    Index Scriptorium Estoniae

    Tanner, Michael

    1996-01-01

    Uuest heliplaadist "Shostakovich: The Orchestral Songs Vol. 2: Six Romances on texts by Japanese poets, Op. 21. Six Poems on Marina Tsvetayeva, Op. 143. Suite on Verses of Michelangelo, Op. 145. Gothenburg Symphony Orchestra, Neeme Järvi". DG 447 085-2GH (71 minutes:DDD)

  19. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

    1992-02-01

    This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.

  20. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-08-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Martin Marietta Energy Systems, Inc. to prepare a Phase H Sampling Plan to describe field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures. To address deficiencies noted by the regulators, the following activities will be conducted: Background surface soil and surface water/sediment samples will be collected based on statistical considerations for comparison to site data. Existing and new data to be collected will be used to support a human health risk assessment that includes the future homesteader scenario. Biological surveys, samples, and measurements will be collected/conducted to augment existing data and support an ecological risk assessment. Another round of groundwater sampling will be conducted, including on-site wells and the wells on Chestnut Ridge downgradient of the Security Pits. Borings will be completed in the FCAP to collect samples from below the surface depth to describe the chemical characteristics and volume of the ash. The volume of ash associated with sluice channel on Chestnut Ridge will be determined. Soil samples will be corrected below the coal ash in the FCAP and adjacent to sluice channel to evaluate soil contamination and migration of contaminants

  1. African Journal of Biotechnology - Vol 14, No 18 (2015)

    African Journals Online (AJOL)

    African Journal of Biotechnology - Vol 14, No 18 (2015). Journal Home ... Isolation of microalgae species from arid environments and evaluation of their potentials for biodiesel production · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  2. Jolivet: Complete Flute Music, Vol. 2 / Guy S. Rickards

    Index Scriptorium Estoniae

    Rickards, Guy S.

    1996-01-01

    Uuest heliplaadist "Jolivet: Complete Flute Music, Vol. 2. Kroumata Percussion Ensemble, Tapiola Sinfonietta, Paavo Järvi". BIS CD 739 (64 minutes: DDD). Item marked from CD630 (6/94), CD272, remainder new to UK

  3. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  4. Environmental mining plan of the construction materials industry in Cartagena, Phase 1 Diagnostic. Vol.1 and Vol.2(Annex)

    International Nuclear Information System (INIS)

    Castiblanco, Carmen Rosa; Franco Serna, Jose Vicente; Nino, Jaime

    1996-01-01

    INGEOMINAS carried out this project in the cities of Cartagena, Bucaramanga, Cali and Bogota, in two phases: Phase 1 (Diagnostic) and Phase II (Formulation of Handling Plan). The phase 1 that here is described, it upgrades the knowledge of the extractive industry of the construction materials for the city of Cartagena, through bibliographical revision and field work, carried out in 50 quarries that supply from these materials to the city. This study, besides the economic and legal handling, identifies technical aspects related with the geology, the mining and the environmental situation. In accordance with their likeness, geologic, morphological and of exploitation (extraction methods and mining development), the quarries met in five groups: Exploitations on calcareous deposits of the La Popa Formation, exploitations on clay deposits of the La Popa Formation, exploitations on detritus deposits of half grain to thick (La Popa-Arenosa Formation; Pendales Conglomerate and Rotinet Formation) and exploitation of calcareous of the Arroyo de Piedra Formation. The extraction of these materials is characterized by its low degree of development technician, lack of planning mining, lack of appropriate infrastructure that allows a better development of the sector, is also evident the control lack on the part of the entities in charge of the handling of this industry. These factors added to a demand every time in increase of these materials, they have taken to a progressive deterioration in the landscape, increase of the noise and particles in the air and in the waters. The low control in this activity has generated the proliferation of informal exploitations that they find in this activity a way of subsistence

  5. African Journal of Clinical and Experimental Microbiology - Vol 5, No ...

    African Journals Online (AJOL)

    African Journal of Clinical and Experimental Microbiology - Vol 5, No 1 (2004) ... ASYMPTOMATIC SIGNIFICANT BACTERIURIA AMONG PREGNANT WOMEN IN ... TO PARASITISM AND THE IMPLICATION ON TREATMENT APPROACH ...

  6. Perception and acceptance of technological risks. Vol. 3

    Energy Technology Data Exchange (ETDEWEB)

    Renn, O

    1981-01-01

    Vol. 3 discusses the problem of attitudes towards nuclear power. Data are compiled for five communities in North-Rhine Westphalia with nuclear facilities and the control community of Kerpen, which has no nuclear power plant. At the same time, the empirical and theoretical investigations are comprehensively evaluated.

  7. Southern African Journal of Environmental Education - Vol 8 (1988)

    African Journals Online (AJOL)

    Southern African Journal of Environmental Education - Vol 8 (1988) ... An interaction of archaeology with school history in a museum education context ... The child in the outdoor classroom · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  8. Research in Hospitality Management - Vol 5, No 2 (2015)

    African Journals Online (AJOL)

    Research in Hospitality Management - Vol 5, No 2 (2015) ... Hotel quality in the European Capital of Culture: Leeuwarden 2018 · EMAIL FREE FULL ... Consumer patronage and willingness-to-pay at different levels of restaurant attributes: A ...

  9. Addendum to Sampling and Analysis Plan (SAP) for Assessment of LANL-Derived Residual Radionuclides in Soils within Tract A-16-d for Land Conveyance and Transfer for Sewage Treatment Facility Area

    Energy Technology Data Exchange (ETDEWEB)

    Whicker, Jeffrey Jay [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gillis, Jessica Mcdonnel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-21

    This report summarizes the sampling design used, associated statistical assumptions, as well as general guidelines for conducting post-sampling data analysis. Sampling plan components presented here include how many sampling locations to choose and where within the sampling area to collect those samples. The type of medium to sample (i.e., soil, groundwater, etc.) and how to analyze the samples (in-situ, fixed laboratory, etc.) are addressed in other sections of the sampling plan.

  10. Development on the High-throughput Vol-oxidizer for Decladding and Voloxidation of Spent Fuel Rod-cuts

    International Nuclear Information System (INIS)

    Kim, Young Hwang; Jung, Jae Hoo; Kim, Ki Ho; Park, Byung Buk; Lee, Hyo Jik; Kim, Sung Hyun; Park, Hee Sung; Lee, Jong Kwang; Kim, Ho Dong

    2009-12-01

    A high-throughput vol-oxidizer which can handle a several ten kg HM/batch is being developed to supply U 3 O 8 powders to an electrolytic reduction reactor in pyro-processing. At the first year step(2007), for enhancement of oxidation and recovery rate, we analyzed the mechanical and chemical methods, and devised the main mechanism with ball drop methods and rotary kiln type. Also, the main devices for oxidation and recovery of rod-cuts were designed by using the Solid Works and COSMOS program tools, and manufactured after thermal/mechanical analysis. In order to verify the main devices, simulation fuels(W 90%+SiO 2 10%) were manufactured and the main devices were tested for the oxidation and recovery rate of its. Here the expansion ratio of simulation fuel is similar to U 3 O 8 (2.7). At the second year step(2008), with the constant ration of rod-cuts volume and expansion ratio of U 3 O 8 (2.7), we produced a theoretical equation that can estimate the volume of rod-cuts according to a variation of their weight and lengths. We considered various materials such as ceramics and Ni-Cr, finally, the APM material which can constantly maintain against high temperature(1,200 .deg. C) and vacuum(1 torr) was selected and a vol-oxidizer was designed. At the third year step(2009), in order to manufacture a high-throughput vol-oxidizer, we have analyzed the vol-oxidizer for remote operability and maintainability, also the remote assembling and disassembling possibilities of the selected modules have been analyzed in terms of visibility, interference, approach, weight, and so on. We have presented final modular design and manufactured a high-throughput vol-oxidizer. Also, we have conducted the blank, heating(over 500 .deg. C) and hull separation test(capacity : 50 kg HM/batch, hull length 50mm) on the high-throughput vol-oxidizer. Also, these design technologies for the high-throughput vol-oxidizer will be utilized in the development of a more efficient vol-oxidizer with higher

  11. South African Journal of Higher Education - Vol 19 (2005)

    African Journals Online (AJOL)

    South African Journal of Higher Education - Vol 19 (2005) ... The 'idea of engagement' and 'the African University in the 21st Century': Some ... The challenges of knowledge production by researchers in Public Administration, a South African ...

  12. FUZZY ACCEPTANCE SAMPLING AND CHARACTERISTIC CURVES

    Directory of Open Access Journals (Sweden)

    Ebru Turano?lu

    2012-02-01

    Full Text Available Acceptance sampling is primarily used for the inspection of incoming or outgoing lots. Acceptance sampling refers to the application of specific sampling plans to a designated lot or sequence of lots. The parameters of acceptance sampling plans are sample sizes and acceptance numbers. In some cases, it may not be possible to define acceptance sampling parameters as crisp values. These parameters can be expressed by linguistic variables. The fuzzy set theory can be successfully used to cope with the vagueness in these linguistic expressions for acceptance sampling. In this paper, the main distributions of acceptance sampling plans are handled with fuzzy parameters and their acceptance probability functions are derived. Then the characteristic curves of acceptance sampling are examined under fuzziness. Illustrative examples are given.

  13. Mizan Law Review - Vol 5, No 2 (2011)

    African Journals Online (AJOL)

    Mizan Law Review - Vol 5, No 2 (2011) ... Ethiopian Law of International Carriage by Air: An Overview · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT ... Comment: Overview of the Core Changes in the New Ethiopian Urban Land Leasehold Proclamation · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  14. (JASR) Vol. 12, No. 2, 2012 DEPLETING FOREST RESOURCES

    African Journals Online (AJOL)

    HP

    deteriorating forest resources of Nigeria and its impact on climate change. Key words: Forest Resources, ... Mangrove Forest. Sub Total. 905,930 .... South America” Global Biogeographical Cycle vol 9, pp 329-350. Miller, K. R., Reid, W. V., ...

  15. Pan African Medical Journal - Vol 16, No 1 (2014)

    African Journals Online (AJOL)

    Pan African Medical Journal - Vol 16, No 1 (2014) .... Cancer incidence in Morocco: report from Casablanca registry 2005-2007 · EMAIL FREE FULL .... Maladie de Leo-Buerger faisant suite à une intoxication au cannabis · EMAIL FREE FULL ...

  16. African Heath Sciences Vol 8 No 1.p65

    African Journals Online (AJOL)

    Harriet

    African Health Sciences Vol 8 No 1 March 2008. 36 ... Objective:To highlight difficulties in the diagnosis and management of non-traumatic perforation of small bowel. Material and ..... of three operations for typhoid perforation. Br J Surg. 1997;.

  17. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  18. Evaluation of sampling plans to detect Cry9C protein in corn flour and meal.

    Science.gov (United States)

    Whitaker, Thomas B; Trucksess, Mary W; Giesbrecht, Francis G; Slate, Andrew B; Thomas, Francis S

    2004-01-01

    StarLink is a genetically modified corn that produces an insecticidal protein, Cry9C. Studies were conducted to determine the variability and Cry9C distribution among sample test results when Cry9C protein was estimated in a bulk lot of corn flour and meal. Emphasis was placed on measuring sampling and analytical variances associated with each step of the test procedure used to measure Cry9C in corn flour and meal. Two commercially available enzyme-linked immunosorbent assay kits were used: one for the determination of Cry9C protein concentration and the other for % StarLink seed. The sampling and analytical variances associated with each step of the Cry9C test procedures were determined for flour and meal. Variances were found to be functions of Cry9C concentration, and regression equations were developed to describe the relationships. Because of the larger particle size, sampling variability associated with cornmeal was about double that for corn flour. For cornmeal, the sampling variance accounted for 92.6% of the total testing variability. The observed sampling and analytical distributions were compared with the Normal distribution. In almost all comparisons, the null hypothesis that the Cry9C protein values were sampled from a Normal distribution could not be rejected at 95% confidence limits. The Normal distribution and the variance estimates were used to evaluate the performance of several Cry9C protein sampling plans for corn flour and meal. Operating characteristic curves were developed and used to demonstrate the effect of increasing sample size on reducing false positives (seller's risk) and false negatives (buyer's risk).

  19. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, Jaquelin M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palchak, Joseph D [National Renewable Energy Lab. (NREL), Golden, CO (United States); McBennett, Brendan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ehlen, Ali [National Renewable Energy Lab. (NREL), Golden, CO (United States); Deshmukh, Ranjit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Abhyankar, Nikit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Soonee, Sushil Kumar [Power System Operation Corporation Limited (POSOCO), New Delhi (India); Narasimhan, S. R. [Power System Operation Corporation Limited (POSOCO), New Delhi (India); Joshi, Mohit [Power System Operation Corporation Limited (POSOCO), New Delhi (India); Sreedharan, Priya [U.S. Agency for International Development (USAID), Washington, DC (United States)

    2017-10-27

    The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission

  20. Schostakowitsch. Orchesterlieder (Vol. 2), Neeme Järvi / Werner Pfister

    Index Scriptorium Estoniae

    Pfister, Werner

    1996-01-01

    Uuest heliplaadist "Schostakowitsch. Orchesterlieder (Vol. 2): Sechs Romanzen op. 21, Sechs Gedichte op. 143a, Suite auf Verse von Michelangelo Buonarroti op. 145a. Göteborger Sinfoniker, Neeme Järvi". DG CD 447 085-2 (WD: 71'06") DDD

  1. Author Details

    African Journals Online (AJOL)

    Yemanu, H. Vol 3 (1968) - Articles An example of a small Design Gravity Dams Abstract PDF · Vol 4 (1970) - Articles Project orientated planning, scheduling and controlling technique. Abstract PDF · Vol 4 (1970) - Articles Development of the Awash Valley Abstract PDF · Vol 5 (1971) - Articles Planning and financing of ...

  2. ALARA ASSESSMENT OF SETTLER SLUDGE SAMPLING METHODS

    International Nuclear Information System (INIS)

    Nelsen, L.A.

    2009-01-01

    The purpose of this assessment is to compare underwater and above water settler sludge sampling methods to determine if the added cost for underwater sampling for the sole purpose of worker dose reductions is justified. Initial planning for sludge sampling included container, settler and knock-out-pot (KOP) sampling. Due to the significantly higher dose consequence of KOP sludge, a decision was made to sample KOP underwater to achieve worker dose reductions. Additionally, initial plans were to utilize the underwater sampling apparatus for settler sludge. Since there are no longer plans to sample KOP sludge, the decision for underwater sampling for settler sludge needs to be revisited. The present sampling plan calls for spending an estimated $2,500,000 to design and construct a new underwater sampling system (per A21 C-PL-001 RevOE). This evaluation will compare and contrast the present method of above water sampling to the underwater method that is planned by the Sludge Treatment Project (STP) and determine if settler samples can be taken using the existing sampling cart (with potentially minor modifications) while maintaining doses to workers As Low As Reasonably Achievable (ALARA) and eliminate the need for costly redesigns, testing and personnel retraining

  3. ALARA ASSESSMENT OF SETTLER SLUDGE SAMPLING METHODS

    Energy Technology Data Exchange (ETDEWEB)

    NELSEN LA

    2009-01-30

    The purpose of this assessment is to compare underwater and above water settler sludge sampling methods to determine if the added cost for underwater sampling for the sole purpose of worker dose reductions is justified. Initial planning for sludge sampling included container, settler and knock-out-pot (KOP) sampling. Due to the significantly higher dose consequence of KOP sludge, a decision was made to sample KOP underwater to achieve worker dose reductions. Additionally, initial plans were to utilize the underwater sampling apparatus for settler sludge. Since there are no longer plans to sample KOP sludge, the decision for underwater sampling for settler sludge needs to be revisited. The present sampling plan calls for spending an estimated $2,500,000 to design and construct a new underwater sampling system (per A21 C-PL-001 RevOE). This evaluation will compare and contrast the present method of above water sampling to the underwater method that is planned by the Sludge Treatment Project (STP) and determine if settler samples can be taken using the existing sampling cart (with potentially minor modifications) while maintaining doses to workers As Low As Reasonably Achievable (ALARA) and eliminate the need for costly redesigns, testing and personnel retraining.

  4. Nigerian Journal of Chemical Research 29 Vol. 15, 2010 ...

    African Journals Online (AJOL)

    Hp

    Nigerian Journal of Chemical Research. 29. Vol. 15, 2010. Antibacterial & Antifungal Studies On Some Coordination Compound Of Metals. With Ampicillin. Pranay Guru. Department of Engineering Chemistry, People's College of Research & Technology, Bhopal. (M. P.) India, email:pranayguru@rediffmail.com. ABSTRACT.

  5. African Journal of Biotechnology - Vol 12, No 21 (2013)

    African Journals Online (AJOL)

    African Journal of Biotechnology - Vol 12, No 21 (2013) ... Studies of the genetics of inheritance of stem rust resistance in bread wheat · EMAIL FREE .... Evaluation of the effect of ginger modified cassava starch as thickener in the formulation of ...

  6. Cross sections for atomic processes, vol. 2

    International Nuclear Information System (INIS)

    Takayanagi, Kazuo; Suzuki, Hiroshi; Otani, Shunsuke

    1977-09-01

    This data collection book contains the data on all processes involving hydrogen and helium isotopes, their ions, electrons and photons, collected systematically and comprehensively, and is compiled subsequently to Vol. 1 as one of the works of the data collection study group in the Institute of Plasma Physics, Nagoya University, Japan. The items of the contents will include energy level, multiplicately excited state, radiation process, electron collision, ionic collision, recombination, collision of neutral atoms, colliding process involving molecules, and other processes. However, the first edition this time contains energy level, radiation process, electron collision and ionic collision, and the data on remaining items are now under collection. Though some criticisms have been heard about Vol. 1, the authors consider that such comprehensive collection based on systematic classification is the foundation of making a generalized data bank expected to become necessary in future. Thus the data collection book includes all relevant processes, and records the experimental data and theoretically calculated results in principle without modification by selecting them systematically. This year, investigation on data evaluation is taken up also as one of the tasks of the study group. (Wakatsuki, Y.)

  7. Whole arm manipulation planning based on feedback velocity fields and sampling-based techniques.

    Science.gov (United States)

    Talaei, B; Abdollahi, F; Talebi, H A; Omidi Karkani, E

    2013-09-01

    Changing the configuration of a cooperative whole arm manipulator is not easy while enclosing an object. This difficulty is mainly because of risk of jamming caused by kinematic constraints. To reduce this risk, this paper proposes a feedback manipulation planning algorithm that takes grasp kinematics into account. The idea is based on a vector field that imposes perturbation in object motion inducing directions when the movement is considerably along manipulator redundant directions. Obstacle avoidance problem is then considered by combining the algorithm with sampling-based techniques. As experimental results confirm, the proposed algorithm is effective in avoiding jamming as well as obstacles for a 6-DOF dual arm whole arm manipulator. Copyright © 2013 ISA. Published by Elsevier Ltd. All rights reserved.

  8. Engineering task plan for upgrades to the leveling jacks on core sample trucks number 3 and 4; TOPICAL

    International Nuclear Information System (INIS)

    KOSTELNIK, A.J.

    1999-01-01

    Characterizing the waste in underground storage tanks at the Hanford Site is accomplished by obtaining a representative core sample for analysis. Core sampling is one of the numerous techniques that have been developed for use given the environmental and field conditions at the Hanford Site. Core sampling is currently accomplished using either Push Mode Core Sample Truck No.1 or; Rotary Mode Core Sample Trucks No.2, 3 or 4. Past analysis (WHC 1994) has indicated that the Core Sample Truck (CST) leveling jacks are structurally inadequate when lateral loads are applied. WHC 1994 identifies many areas where failure could occur. All these failures are based on exceeding the allowable stresses listed in the American Institute of Steel Construction (AISC) code. The mode of failure is for the outrigger attachments to the truck frame to fail resulting in dropping of the CST and possible overturning (Ref. Ziada and Hundal, 1996). Out of level deployment of the truck can exceed the code allowable stresses in the structure. Calculations have been performed to establish limits for maintaining the truck level when lifting. The calculations and the associated limits are included in appendix A. The need for future operations of the CSTS is limited. Sampling is expected to be complete in FY-2001. Since there is limited time at risk for continued use of the CSTS with the leveling controls without correcting the structural problems, there are several design changes that could give incremental improvements to the operational safety of the CSTS with limited impact on available operating time. The improvements focus on making the truck easier to control during lifting and leveling. Not all of the tasks identified in this ETP need to be performed. Each task alone can improve the safety. This engineering task plan is the management plan document for implementing the necessary additional structural analysis. Any additional changes to meet requirements of standing orders shall require a

  9. Editorial - International Journal of Sustainable Energy Planning and Management Vol 11

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2016-12-01

    Full Text Available This editorial introduces the 11th volume of the International Journal of Sustainable Energy Planning and Management. The volume addresses smart energy systems and the optimal ways of integrating renewable energy into these. Two of the contributions are from the perspective of energy storage with one arguing that other storage options are preferable to designated electricity storage. This includes thermal storages for house heating and gas and liquid fuel storage for e.g. the transportation sector. Secondly, a paper investigates more narrowly communal vs individual electricity storage in residential PV systems with a view to lowering grid dependency. Lastly, an analysis investigates the role of flexible electricity demand as a means to integrate fluctuating renewable energy sources such as wind and PV.

  10. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  11. Y-12 Plant Groundwater Protection Program: Groundwater and surface water sampling and analysis plan for Calendar Year 1998

    International Nuclear Information System (INIS)

    1997-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 1998 at the Department of Energy (DOE) Y-12 Plant. These monitoring activities are managed by the Y-12 Plant Environmental Compliance Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Groundwater and surface water monitoring during CY 1998 will be performed in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. Groundwater and surface water monitoring will be performed during CY 1998 to comply with: (1) requirements specified in Resource Conservation and Recover Act (RCRA) post-closure permits regarding RCRA corrective action monitoring and RCRA detection monitoring; (2) Tennessee Department of Environment and Conservation regulations governing detection monitoring at nonhazardous solid waste management facilities; and (3) DOE Order 5400.1 surveillance monitoring and exit pathway monitoring. Data from some of the sampling locations in each regime will be used to meet the requirements of more than one of the monitoring drivers listed above. Modifications to the CY 1998 monitoring program may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected monitoring wells, or wells could be removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  12. Preconception health: awareness, planning, and communication among a sample of US men and women.

    Science.gov (United States)

    Mitchell, Elizabeth W; Levis, Denise M; Prue, Christine E

    2012-01-01

    It is important to educate both men and women about preconception health (PCH), but limited research exists in this area. This paper examines men's and women's awareness of exposure to PCH information and of specific PCH behaviors, PCH planning, and PCH discussions with their partners. Data from Porter Novelli's 2007 Healthstyles survey were used. Women and men of reproductive age were included in the analysis (n = 2,736) to understand their awareness, planning, and conversations around PCH. Only 27.9% of women and men reported consistently using an effective birth control method. The majority of men (52%) and women (43%) were unaware of any exposure to PCH messages; few received information from their health care provider. Women were more aware than men of specific pre-pregnancy health behaviors. Women in the sample reported having more PCH conversations with their partners than did men. PCH education should focus on both women and men. Communication about PCH is lacking, both between couples and among men and women and their health care providers. PCH education might benefit from brand development so that consumers know what to ask for and providers know what to deliver.

  13. Sampling and analysis plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study, and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that impact ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of media testing. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetlands. This plan will be implemented as part of the BCV Phase II Treatability Study Best Management Practices Plan and in conjunction with the BCV Phase II Treatability Study Health and Safety Plan and the BCV Phase II Treatability Study Waste Management Plan

  14. Sampling and analysis plan for the characterization of eight drums at the 200-BP-5 pump-and-treat systems

    International Nuclear Information System (INIS)

    Laws, J.R.

    1995-01-01

    Samples will be collected and analyzed to provide sufficient information for characterization of mercury and aluminum contamination in drums from the final rinse of the tanks in the two pump-and-treat systems supporting the 200-BP-5 Operable Unit. The data will be used to determine the type of contamination in the drums to properly designate the waste for disposal or treatment. This sampling plan does not substitute the sampling requirements but is a separate sampling event to manage eight drums containing waste generated during an unanticipated contamination of the process water with mercury and aluminum nitrate nonahydrate (ANN). The Toxicity Characteristic Leaching Procedure (TCLP) will be used for extraction, and standard US Environmental Protection Agency (EPA) methods will be used for analysis

  15. 51. Meeting of the Chemical Societies: Almanac of Contributions, Vol. Program, 1, 2, 3, 4 Molecular Models (Workshop)

    International Nuclear Information System (INIS)

    Uher, M.; Benes, P.; Carsky, J.; Ctrnactova, H.; Fecenko, J.; Fellner, P.; Hodul, P.; Koprda, V.; Kratochvil, B.; Krkoska, P.; Kuruc, J.; Lehotay, J.; Matousek, J.; Milichovsky, P.; Omastova, M.; Petrus, L. jr.; Petrus, L. sr.; Schwendt, P.; Silny, P.; Sevcik, P.; Toma, S.; Uherova, R.; Zachar, P.

    1999-09-01

    The publication has been set up as a abstracts of the meeting dealing with different chemical problems. The book (Vol. 1) consists of the sections: All-plenary lectures (9 papers); (D) History of the chemistry (14); (K) Didactics of chemistry (32); The book (Vol. 2) consists of the sections: (A) Analytical chemistry (48); (B) Inorganic chemistry (75); (C) Physical chemistry (27); (F) Nuclear chemistry and radioecology (12); (L) Environmental chemistry and toxicology (33); (M) Agricultural chemistry (20). The book (Vol. 3) consists of the sections: (E) Wood, pulp, paper (15); (G) Macromolecular chemistry (42); (H) Organic chemistry, bio-organic chemistry and pharmaceutical chemistry (96); (I) Food chemistry and biochemistry (34); (J) Textile, fibres and foil materials (9). The book (Vol. 4) consists of the workshop Molecular models (3 papers)

  16. Sampling and analysis plan for sludge located on the floor and in the pits of the 105-K basins

    International Nuclear Information System (INIS)

    BAKER, R.B.

    1998-01-01

    This Sampling and Analysis Plan (SAP) provides direction for the sampling of the sludge found on the floor and in the remote pits of the 105-K Basins to provide: (1) basic data for the sludges that have not been characterized to-date and (2) representative Sludge material for process tests to be made by the SNF Project/K Basins sludge treatment process subproject. The sampling equipment developed will remove representative samples of the radioactive sludge from underwater at the K Basins, depositing them in shielded containers for transport to the Hanford Site laboratories. Included in the present document is the basic background logic for selection of the samples to meet the requirements established in the Data Quality Objectives (DQO), HNF-2033, for this sampling activity. The present document also includes the laboratory analyses, methods, procedures, and reporting that will be required to meet the DQO

  17. Planning with Reachable Distances

    KAUST Repository

    Tang, Xinyu

    2009-01-01

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the robot\\'s number of degrees of freedom. In addition to supporting efficient sampling, we show that the RD-space formulation naturally supports planning, and in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1000 links in time comparable to open chain sampling, and we can generate samples for 1000-link multi-loop systems of varying topology in less than a second. © 2009 Springer-Verlag.

  18. Ghana Medical Journal - Vol 47, No 2 (2013)

    African Journals Online (AJOL)

    Ghana Medical Journal - Vol 47, No 2 (2013). Journal Home > Archives ... DOWNLOAD FULL TEXT. AB Olokoba, W Gashau, S Bwala, A Adamu, FK Salawu, 79-81 ... DOWNLOAD FULL TEXT. EY Bonney, NA Addo, NAA Ntim, F Addo-Yobo, P Bondzie, KE Aryee, J Barnor, J brandful, V Bekoe, SA Ohene, W Ampofo, 82-86 ...

  19. Afican Health Sciences Vol 10 No 1.pmd

    African Journals Online (AJOL)

    Administrator

    African Health Sciences Vol 10 No 1 March 2010. 89. Rethinking ... There is a worsening scarcity of Human Resource for ... This is not in any way lowering standards of oncologic diagnosis but filling the otherwise ... for health ratios stand at 0.8 health workers per 1000 ... cancer occurs 10-15years earlier in black women.

  20. South African Medical Journal - Vol 88, No 3 (1998)

    African Journals Online (AJOL)

    Tuberculosis and anorexia nervosa · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Christopher Paul Szabo, 275-276. Books Advances in Pediatric Pulmonology. Pediatric and Adolescent Medicine Vol. 7 · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  1. African Journal of Clinical and Experimental Microbiology - Vol 5, No ...

    African Journals Online (AJOL)

    African Journal of Clinical and Experimental Microbiology - Vol 5, No 3 (2004) ... In Peripheral Leukocyte And Body Fluids Of Onchocerciasis Patients Treated With ... A Study Of Asymptomatic Bacteriuria In Pregnancy In Ile - Ife, Southwestern ...

  2. African Journal of Chemical Education - Vol 7, No 1 (2017)

    African Journals Online (AJOL)

    African Journal of Chemical Education - Vol 7, No 1 (2017). Journal Home ... Hybridization and molecular geometry: A number game · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD ... AJOL African Journals Online. HOW TO ...

  3. Afican Health Sciences Vol 9 No 1.pmd

    African Journals Online (AJOL)

    Administrator

    African Health Sciences Vol 9 No 1 March 2009. 41 compounds isolated from the extracts can be applied as weed killers and have been tested on the water hyacinth .... dispensing serial dilutions of the test extract, concentrations ranging from 5.0 mg/ml to 50.0 mg/ ml. McFarland No.1 standard was used in the preparation ...

  4. International Journal of Health Research - Vol 2, No 4 (2009)

    African Journals Online (AJOL)

    International Journal of Health Research - Vol 2, No 4 (2009) ... Psychosocial characteristics of patients admitted to a drug rehabilitation unit in Nigeria · EMAIL ... Hepatoprotective and antioxidant activities of fruit pulp of limonia acidissima linn ...

  5. West African Journal of Industrial and Academic Research - Vol 4 ...

    African Journals Online (AJOL)

    West African Journal of Industrial and Academic Research - Vol 4, No 1 (2012) ... Open Access DOWNLOAD FULL TEXT Subscription or Fee Access ... on Gas Turbine Engine Data · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  6. Sample-Starved Large Scale Network Analysis

    Science.gov (United States)

    2016-05-05

    As reported in our journal publication (G. Marjanovic and A. O. Hero, ”l0 Sparse Inverse Covariance Estimation,” IEEE Trans on Signal Processing, vol... Marjanovic and A. O. Hero, ”l0 Sparse Inverse Covariance Estimation,” in IEEE Trans on Signal Processing, vol. 63, no. 12, pp. 3218-3231, May 2015. 6. G

  7. Sampling-Based Motion Planning Algorithms for Replanning and Spatial Load Balancing

    Energy Technology Data Exchange (ETDEWEB)

    Boardman, Beth Leigh [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-12

    The common theme of this dissertation is sampling-based motion planning with the two key contributions being in the area of replanning and spatial load balancing for robotic systems. Here, we begin by recalling two sampling-based motion planners: the asymptotically optimal rapidly-exploring random tree (RRT*), and the asymptotically optimal probabilistic roadmap (PRM*). We also provide a brief background on collision cones and the Distributed Reactive Collision Avoidance (DRCA) algorithm. The next four chapters detail novel contributions for motion replanning in environments with unexpected static obstacles, for multi-agent collision avoidance, and spatial load balancing. First, we show improved performance of the RRT* when using the proposed Grandparent-Connection (GP) or Focused-Refinement (FR) algorithms. Next, the Goal Tree algorithm for replanning with unexpected static obstacles is detailed and proven to be asymptotically optimal. A multi-agent collision avoidance problem in obstacle environments is approached via the RRT*, leading to the novel Sampling-Based Collision Avoidance (SBCA) algorithm. The SBCA algorithm is proven to guarantee collision free trajectories for all of the agents, even when subject to uncertainties in the knowledge of the other agents’ positions and velocities. Given that a solution exists, we prove that livelocks and deadlock will lead to the cost to the goal being decreased. We introduce a new deconfliction maneuver that decreases the cost-to-come at each step. This new maneuver removes the possibility of livelocks and allows a result to be formed that proves convergence to the goal configurations. Finally, we present a limited range Graph-based Spatial Load Balancing (GSLB) algorithm which fairly divides a non-convex space among multiple agents that are subject to differential constraints and have a limited travel distance. The GSLB is proven to converge to a solution when maximizing the area covered by the agents. The analysis

  8. Soil sampling and analysis plan for the Bear Creek Valley Floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. In addition to this SAP, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19&D2) presents background information pertaining to this floodplain investigation.

  9. Soil sampling and analysis plan for the Bear Creek Valley Floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-03-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. In addition to this SAP, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19 ampersand D2) presents background information pertaining to this floodplain investigation

  10. Volatile profile of heated soybean oil treated with quercetin and chlorogenic acid Perfil de compostos voláteis do óleo de soja aquecido e tratado com quercetina e ácido clorogênico

    Directory of Open Access Journals (Sweden)

    Adriana Leão de Miranda

    2008-12-01

    Full Text Available Changes in the profile of volatile compounds after the heating of refined soybean oil without adding antioxidants, and treated with quercetin and chlorogenic acid (5-CQA were investigated by GC/FID, GC/MS, and GC/SNIFFING. The heating temperature of the oil sample was 20 °C for the first minute, and then it was increased up to 160 °C at the rate of 10 °C min-1. The final temperature was kept for 10 minutes. 19 volatiles were identified in the heated samples without antioxidants. Medium-chain carbonyls predominated in the volatile fraction, mainly 2-heptenal, 2,4-heptadienal and 2,4-decadienal. Around 11 to 15 volatile compounds were detected in the heated samples treated with 5-CQA and quercetin, respectively. 5-CQA was not very efficient in delaying the formation of oxidative volatile compounds. The samples quercetin presented lower proportion of carbonyls with C6-C9.. The GC peak area data were used as an approach to estimate the relative content of each volatile compound and indicate that the samples treated with quercetin (p As alterações no perfil de compostos voláteis, após o aquecimento de óleo de soja refinado sem a adição de antioxidantes e tratado previamente com quercetina e ácido clorogênico (5-ACQ, foram investigadas através da CG/DIC, CG/EM e CG/SNIFFING. A temperatura de aquecimento do óleo foi de 20 °C no primeiro minuto e aumentada até 160 °C à taxa de 10 °C min-1. A temperatura final foi mantida por 10 minutos. Um total de 19 compostos voláteis foi identificado nas amostras aquecidas sem a adição de antioxidantes. As carbonilas de cadeia média predominaram na fração volátil. Cerca de 15 e 11 compostos voláteis foram detectados no óleo aquecido com adição prévia de quercetina e 5-ACQ, respectivamente. As amostras tratadas com quercetina mostraram uma menor proporção de carbonilas com esqueletos de carbono C6-C9. A composição estimada de compostos voláteis mostrou que amostras tratadas com

  11. Journal of Business Research - Vol 6, No 1-2 (2012)

    African Journals Online (AJOL)

    Journal of Business Research - Vol 6, No 1-2 (2012) ... Economic Cost of Breast Cancer in Ghana: The Komfo Anokye Teaching Hospital ... Capital Adequacy and the Performance of Ghanaian Banks · EMAIL FULL TEXT EMAIL FULL TEXT

  12. West African Journal of Industrial and Academic Research - Vol 17 ...

    African Journals Online (AJOL)

    West African Journal of Industrial and Academic Research - Vol 17, No 1 (2017) ... Open Access DOWNLOAD FULL TEXT Subscription or Fee Access ... The effect of electricity and gas losses on Nigeria`s Gross Domestic Product · EMAIL ...

  13. Studies in Gender and Development in Africa - Vol 2 (2008)

    African Journals Online (AJOL)

    Studies in Gender and Development in Africa - Vol 2 (2008) ... I don't love my husband” Advice Columns as Teaching Resource for Gender and Sexuality: Experiences from the University of Cape Coast, Ghana ... Current Issue Atom logo

  14. B-cell waste classification sampling plan

    International Nuclear Information System (INIS)

    HOBART, R.L.

    1999-01-01

    This report documents the methods used to collect samples and analyze data necessary to verify and/or determine the radionuclide content of the 324 Facility B-Cell decontamination and decommissioning waste stream

  15. African Journal for Physical Activity and Health Sciences - Vol 21 ...

    African Journals Online (AJOL)

    African Journal for Physical Activity and Health Sciences - Vol 21, No 3 (2015) ... Factors Influencing the Health of Men in Polygynous Relationship · EMAIL FULL ... Views of HIV Positive Pregnant Women on Accessibility of the Prevention of ...

  16. Journal of Community Medicine and Primary Health Care - Vol 23 ...

    African Journals Online (AJOL)

    Journal of Community Medicine and Primary Health Care - Vol 23, No 1-2 (2011) ... The Nigerian National Health Bill 2011: Delay of Presidential Assent to an Act: ... Knowledge And Practice of Occupational Safety Among Quarry Workers in A ...

  17. Nigerian Journal of Chemical Research Vol. 20, 2015 39 Seasonal ...

    African Journals Online (AJOL)

    Dr M Waziri

    Vol. 20, 2015. 39. Seasonal Variations in Physicochemical Properties of Water, Sediment and Fish of ... The levels of some physicochemical parameters in the dam water were determined in wet and dry seasons .... Water, Waste and Health in ...

  18. Rhodium. Suppl. Vol. B1

    International Nuclear Information System (INIS)

    Griffith, W.P.; Jehn, H.; McCleverty, J.A.; Raub, C.J.; Robinson, S.D.

    1982-01-01

    The present rhodium vol. B1 is concerned largely with linary compounds and coordination complexes of this important metal, which is used either alone or in alloy form for fabrication of other materials or for heterogeneous catalysis. In first two chapters are devoted for hydrides, oxides, ternary and quaternary oxorhodates. Third chapter is on different type of complexes with nitrogen. From chapter four to seven is on halogen complexes with this metal. Next chapters are on sulphides, sulphoxide and sulphito complexes, sulphates and sulphato complexes, selenides and tellurides, borides, borane complexes, carbides, carbonato, cyno, fulminato and thiocyanato complexes. Finally, silicide, phosphides, phosphito and arsenides are treated over here. (AB)

  19. Journal of EEA, Vol. 30, 2013 SIEVE TRAY EFFICIENCY USING ...

    African Journals Online (AJOL)

    dell

    Journal of EEA, Vol. 30, 2013. SIEVE TRAY EFFICIENCY USING CFD MODELING AND SIMULATION ... ABSTRACT. In this work, computational fluid dynamics (CFD) .... per unit volume, MG is the molecular weight of the gas/vapor, kL and kG ...

  20. High priority tank sampling and analysis report

    International Nuclear Information System (INIS)

    Brown, T.M.

    1998-01-01

    In July 1993, the Defense Nuclear Facilities Board issued Recommendation 93-5 (Conway 1993) which noted that there was insufficient tank waste technical information and the pace to obtain it was too slow to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. In response, the US Department of Energy, in May 1996, issued Revision 1 of the Recommendation 93-5 Implementation Plan (DOE-RL 1996). The Implementation Plan presented a modified approach to achieve the original plan's objectives, concentrating on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program could be obtained. The Implementation Plan proposed 28 High Priority tanks for near term core sampling and analysis, which along with sampling and analysis of other non-High Priority tanks, could provide the scientific and technical data to confirm assumptions, calibrate models, and.measure safety related phenomenology of the waste. When the analysis results of the High Priority and other-tank sampling were reviewed, it was expected that a series of 12 questions, 9 related to safety issues and 3 related to planning for the disposal process, should be answered allowing key decisions to be made. This report discusses the execution of the Implementation Plan and the results achieved in addressing the questions. Through sampling and analysis, all nine safety related questions have been answered and extensive data for the three disposal planning related questions have been collected, allowing for key decision making. Many more tanks than the original 28 High Priority tanks identified in the Implementation Plan were sampled and analyzed. Twenty-one High Priority tanks and 85 other tanks were core sampled and used to address the questions. Thirty-eight additional tanks were auger

  1. South African Journal of Education - Vol 28, No 4 (2008)

    African Journals Online (AJOL)

    South African Journal of Education - Vol 28, No 4 (2008) ... in Italian high-school prospective mathematics and physics teachers · EMAIL FREE FULL TEXT ... Critical thinking: are the ideals of OBE failing us or are we failing the ideals of OBE?

  2. South African Journal of Education - Vol 31, No 1 (2011)

    African Journals Online (AJOL)

    South African Journal of Education - Vol 31, No 1 (2011) ... How an analysis of reviewers' reports can enhance the quality of submissions to a journal of education ... Doctoral learning: a case for a cohort model of supervision and support ...

  3. Test plan for the Sample Transfer Canister system

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1998-01-01

    The Sample Transfer Canister will be used by the Waste Receiving and Processing Facility (WRAP) for the transport of small quantity liquid samples that meet the definition of a limited quantity radioactive material, and may also be corrosive and/or flammable. These samples will be packaged and shipped in accordance with the US Department of Transportation (DOT) regulation 49 CFR 173.4, ''Exceptions for small quantities.'' The Sample Transfer Canister is of a ''French Can'' design, intended to be mated with a glove box for loading/unloading. Transport will typically take place north of the Wye Barricade between WRAP and the 222-S Laboratory. The Sample Transfer Canister will be shipped in an insulated ice chest, but the ice chest will not be a part of the small quantity package during prototype testing

  4. UMAPRM: Uniformly sampling the medial axis

    KAUST Repository

    Yeh, Hsin-Yi Cindy

    2014-05-01

    © 2014 IEEE. Maintaining clearance, or distance from obstacles, is a vital component of successful motion planning algorithms. Maintaining high clearance often creates safer paths for robots. Contemporary sampling-based planning algorithms That utilize The medial axis, or The set of all points equidistant To Two or more obstacles, produce higher clearance paths. However, They are biased heavily Toward certain portions of The medial axis, sometimes ignoring parts critical To planning, e.g., specific Types of narrow passages. We introduce Uniform Medial Axis Probabilistic RoadMap (UMAPRM), a novel planning variant That generates samples uniformly on The medial axis of The free portion of Cspace. We Theoretically analyze The distribution generated by UMAPRM and show its uniformity. Our results show That UMAPRM\\'s distribution of samples along The medial axis is not only uniform but also preferable To other medial axis samplers in certain planning problems. We demonstrate That UMAPRM has negligible computational overhead over other sampling Techniques and can solve problems The others could not, e.g., a bug Trap. Finally, we demonstrate UMAPRM successfully generates higher clearance paths in The examples.

  5. Sampling pig farms at the abattoir in a cross-sectional study − Evaluation of a sampling method

    DEFF Research Database (Denmark)

    Birkegård, Anna Camilla; Hisham Beshara Halasa, Tariq; Toft, Nils

    2017-01-01

    slaughter pigs. It was not possible to visit farms within the designated timeframe. Therefore, it was decided to use convenience sampling at the abattoir. Our approach was carried out in three steps: 1) planning: using data from meat inspection to plan at which abattoirs and how many farms to sample; 2......A cross-sectional study design is relatively inexpensive, fast and easy to conduct when compared to other study designs. Careful planning is essential to obtaining a representative sample of the population, and the recommended approach is to use simple random sampling from an exhaustive list...... of units in the target population. This approach is rarely feasible in practice, and other sampling procedures must often be adopted. For example, when slaughter pigs are the target population, sampling the pigs on the slaughter line may be an alternative to on-site sampling at a list of farms. However...

  6. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  7. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants

  8. African Journal of Finance and Management - Vol 8, No 2 (2000)

    African Journals Online (AJOL)

    African Journal of Finance and Management - Vol 8, No 2 (2000) ... Effects of Mergers and Acquisitions to Shareholders' Wealth: Evidence from the United Kingdom. ... Matching Managerial Skills and Behaviour with Business Strategy - ...

  9. Sophia: An African Journal of Philosophy - Vol 10, No 2 (2008)

    African Journals Online (AJOL)

    Sophia: An African Journal of Philosophy - Vol 10, No 2 (2008) ... Spiritual intelligence (SQ), leadership and good governance: A treatise ... Traditional religion of Ogbaland: Distinguishing characteristics · EMAIL FULL TEXT EMAIL FULL TEXT

  10. Global Journal of Medical Sciences - Vol 10, No 1-2 (2011)

    African Journals Online (AJOL)

    Global Journal of Medical Sciences - Vol 10, No 1-2 (2011) ... Implications for Global Standards to Promote International Collaboration and Advanced ... Clinical Nursing Research: A Tool for Professional Development · EMAIL FREE FULL ...

  11. Seeps and springs sampling and analysis plant for the Environmental Monitoring Plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the U.S. Department of Energy and operated by Lockheed Martin Energy System, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  12. Seeps and springs sampling and analysis plant for the Environmental Monitoring Plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the U.S. Department of Energy and operated by Lockheed Martin Energy System, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources

  13. Innovative solutions: sample financial management business plan: neurosurgical intensive care unit.

    Science.gov (United States)

    Villanueva-Baldonado, Analiza; Barrett-Sheridan, Shirley E

    2010-01-01

    This article describes one institution's intention to implement a financial management business plan for a neurosurgical intensive care unit in a level I trauma center. The financial objective of this proposed business plan includes a service increase in the patient population requiring critical care in a way that will help control costs.

  14. Final work plan : indoor air and ambient air sampling near the former CCC/USDA grain storage facility in Everest, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2010-05-24

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the western edge of Everest, Kansas, from the early 1950s to the early 1970s. Sampling by the Kansas Department of Health and Environment (KDHE) in 1997 resulted in the detection of carbon tetrachloride in one domestic well (the Nigh well) northwest of the former facility. On behalf of the CCC/USDA, Argonne National Laboratory subsequently conducted a series of investigations to characterize the contamination (Argonne 2003, 2006a,b,c). Automatic, continuous monitoring of groundwater levels began in 2002 and is ongoing at six locations. The results have consistently indicated groundwater flow toward the north-northwest from the former CCC/USDA property to the Nigh property, then west-southwest from the Nigh property to the intermittent creek. Sitewide periodic groundwater and surface water sampling with analysis for volatile organic compounds (VOCs) began in 2008. Argonne's combined data indicate no significant downgradient extension of contamination since 2000. At present, the sampling is annual, as approved by the KDHE (2009) in response to a plan developed for the CCC/USDA (Argonne 2009). This document presents a plan for collecting indoor air samples in homes located along and adjacent to the defined extent of the carbon tetrachloride contamination. The plan was requested by the KDHE. Ambient air samples to represent the conditions along this pathway will also be taken. The purpose of the proposed work is to satisfy KDHE requirements and to collect additional data for assessing the risk to human health due to the potential upward migration of carbon tetrachloride and its primary degradation product (chloroform) into homes located in close proximity to the former grain storage facility, as well as along and within 100 ft laterally from the currently defined plume emanating from the former Everest facility. Investigation of the indoor air

  15. Marine environment news Vol. 4, no. 1, June 2006

    International Nuclear Information System (INIS)

    2006-06-01

    The last six months have been a frenetically busy time for us in Monaco. Our Marine Programmes have been positively reviewed by the Standing Advisory Group on Nuclear Applications (SAGNA) and by an External Evaluation of our Programme. Both Groups report to the Director General, Mr Mohammed ElBaradei, and we hope that new investment in personnel and equipment may eventually result from their evaluations and feedback. We were honoured by the visit of His Serene Highness Prince Albert II of Monaco in March 2006 to our facilities. HSH continues to take a personal interest in MEL's isotopic and pollutant analyses of biota and environmental samples from the Arctic environment which we sampled during His Highness' cruise in June 2005 (see Vol. 3. No 2. MEL Newsletter). This issue also shows that MEL has hosted several important workshops and meetings. The US Research Vessel Endeavour visited the port of Monaco in April and MEL hosted an informal reception for the crew. The visit was in connection with ongoing, joint MEL-US studies in ocean carbon sinks in the Mediterranean (the MEDFLUX programme). More recently, MEL has been involved in discussion with Gulf Member States for a Marine Radioactivity Baseline Study. Finally, I am pleased to note that our MEL Newsletter is clearly having a positive outreach with Member States, since we are currently witnessing a doubling in Member States requests through the TC Concept Proposals (2007-2008) for fellowships, courses and capacity building in marine environment

  16. Browse Title Index

    African Journals Online (AJOL)

    Items 4651 - 4700 of 11090 ... FA Khan, MUR Khattak, M Zahoor. Vol 11, No 9 (2012), Estimation of larval density of Liriomyza sativae Blanchard (Diptera: Agromyzidae) in cucumber greenhouses using fixed precision sequential sampling plans, Abstract PDF. P Namvar, MH Safaralizadeh, V Baniameri, AA Pourmirza, ...

  17. Fabrication and characterization of microstructure of stainless steel matrix composites containing up to 25 vol% NbC

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wen Hao, E-mail: wkan6795@uni.sydney.edu.au [School of Civil Engineering, The University of Sydney, NSW 2006 (Australia); Ye, Zi Jie; Zhu, Yue [School of Civil Engineering, The University of Sydney, NSW 2006 (Australia); Bhatia, Vijay Kumar [School of Aerospace, Mechanical and Mechatronic Engineering, The University of Sydney, NSW 2006 (Australia); Australian Centre for Microscopy and Microanalysis, The University of Sydney, NSW 2006 (Australia); Dolman, Kevin; Lucey, Timothy; Tang, Xinhu [Weir Minerals Australia, Artarmon, NSW 2064 (Australia); Proust, Gwénaëlle [School of Civil Engineering, The University of Sydney, NSW 2006 (Australia); Cairney, Julie [School of Aerospace, Mechanical and Mechatronic Engineering, The University of Sydney, NSW 2006 (Australia); Australian Centre for Microscopy and Microanalysis, The University of Sydney, NSW 2006 (Australia)

    2016-09-15

    AISI 440 stainless steels reinforced with various volume fractions of niobium carbide (NbC) particles of up to 25 vol% were fabricated in-situ using an argon arc furnace and then heat-treated to produce a martensitic matrix. Optical and scanning electron microscopy (SEM), energy dispersive X-ray spectroscopy (EDS) and electron back-scatter diffraction (EBSD) techniques were used to analyze the microstructure, phases and composition of these composites. Interestingly, it was found that Chinese-script NbC could nucleate on existing primary NbC particles creating NbC clusters with complex microstructures. Additionally, hardness tests were used to evaluate viability in mining and mineral processing applications. The increase in NbC content resulted in an overall increase in the hardness of the composites while causing a marginal decrease in the amount of Cr in solid solution with the matrix, which could be a concern for corrosion resistance. The latter was due to the fact that the NbC lattice could dissolve a minor amount of Cr. Thermodynamic simulations also attributed this to a slight increase in M{sub 7}C{sub 3} precipitation. Nonetheless, these novel composites show great promise for applications in wear and corrosive environments. - Highlights: •Stainless steels reinforced with NbC particles of up to 25 vol% were fabricated. •NbC was formed in-situ in the steels using an arc melter. •Martensitic transformation of the matrix of each sample was achieved. •NbC reinforcements increased the bulk hardness values of the steels. •Dissolved Cr in the matrix of each sample was sufficient for passivity in theory.

  18. Sampling and analysis plan for ORNL filter press cake waste from the Liquid and Gaseous Waste Operations Department

    International Nuclear Information System (INIS)

    Bartling, M.H.; Bayne, C.K.; Cunningham, G.R.

    1994-09-01

    This document defines the sampling and analytical procedures needed for the initial characterization of the filter press cake waste from the Process Waste Treatment Plant (PWTP) at the Oak Ridge National Laboratory (ORNL). It is anticipated that revisions to this document will occur as operating experience and sample results suggest appropriate changes be made. Application of this document will be controlled through the ORNL Waste Management and Remedial Action Division. The sampling strategy is designed to ensure that the samples collected present an accurate representation of the waste process stream. Using process knowledge and preliminary radiological activity screens, the filter press cake waste is known to contain radionuclides. Chemical characterization under the premise of this sampling and analysis plan will provide information regarding possible treatments and ultimately, disposal of filter press cake waste at an offsite location. The sampling strategy and analyses requested are based on the K-25 waste acceptance criteria and the Nevada Test Site Defense Waste Acceptance Criteria, Certification, and Transfer Requirements [2, NVO-325, Rev. 1]. The sampling strategy will demonstrate that for the filter press cake waste there is (1) an absence of RCRA and PCBs wastes, (2) an absence of transuranic (TRU) wastes, and (3) a quantifiable amount of radionuclide activity

  19. Quality Assurance Program Plan for the Waste Sampling and Characterization Facility

    International Nuclear Information System (INIS)

    Grabbe, R.R.

    1995-01-01

    The objective of this Quality Assurance Plan is to provide quality assurance (QA) guidance, implementation of regulatory QA requirements, and quality control (QC) specifications for analytical service. This document follows the Department of Energy (DOE)-issued Hanford Analytical Services Quality Assurance Plan (HASQAP) and additional federal [10 US Code of Federal Regulations (CFR) 830.120] QA requirements that HASQAP does not cover. This document describes how the laboratory implements QA requirements to meet the federal or state requirements, provides what are the default QC specifications, and/or identifies the procedural information that governs how the laboratory operates. In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. This document also covers QA elements that are required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAPPs), (QAMS-004), and Interim Guidelines and Specifications for Preparing Quality Assurance Product Plans (QAMS-005) from the Environmental Protection Agency (EPA). A QA Index is provided in the Appendix A

  20. Soil sampling and analysis plan for the Bear Creek Valley floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. It is an addendum to a previously issued document, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19&D2), which presents background information pertaining to this floodplain investigation. The strategy presented in the SAP is to divide the investigation into three component parts: a large-scale characterization of the floodplain; a fine-scale characterization of the floodplain beginning with a known contaminated location; and a stream sediment characterization. During the large-scale and the fine-scale characterizations, soil and biota samples (i.e., small mammals, earthworms, and vegetation) will be collected in order to characterize the nature and extent of floodplain soil contamination and the impact of this contamination on floodplain biota. The fine-scale characterization will begin with an investigation of a site corresponding to the location noted in the Remedial Investigation Work Plan (ES/ER-19&D2) as an area where uranium and PCBs are concentrated in discrete strata. During this fine-scale characterization, a 1 m deep soil profile excavation will be dug into the creek berm, and individual soil strata in the excavation will be screened for alpha radiation, PCBs, and VOCs. After the laboratory analysis results are received, biota samples will be collected in the vicinity of those locations.

  1. Fabrication and Characterization of 5 vol.% (Al2O3p + 8 vol.% (Al2O3f/A336 Hybrid Micron and Nano-Composites

    Directory of Open Access Journals (Sweden)

    Ren Luyang

    2017-01-01

    Full Text Available Hybrid composites are fabricated by adding two reinforcements into matrix materials so that the expected excellent properties can be achieved through the combined advantages of short fibres, and different size particles (micron or nano, which provide a high degree of design freedom. In this paper, hybrid preforms were produced with the different size reinforcement of the Al2O3 particles and short fibres. The Al-Si alloy-based hybrid composites reinforced by 5 vol. % Al2O3 particles and 8 vol. % Al2O3 fibres were fabricated by preform-squeezing casting route. The structure and performance of composite materials were studied with Transmission Electron Microscopy (TEM and Scanning Electron Microscopy (SEM. The results show that the reinforcements, both particles and fibres, distribute homogeneously in the matrix materials, and the properties of composites are found to improve in comparison with the matrix Al-Si alloy.

  2. Egyptian Journal of Medical Human Genetics - Vol 14, No 3 (2013)

    African Journals Online (AJOL)

    Egyptian Journal of Medical Human Genetics - Vol 14, No 3 (2013) ... Comparative study: Parameters of gait in Down syndrome versus matched obese and ... episodes in a Japanese child: Clinical, radiological and molecular genetic analysis ...

  3. Arvustuse piirid ja auhinnad : mõtteid kirjanduskriitikast vol 2 / Jan Kaus

    Index Scriptorium Estoniae

    Kaus, Jan, 1971-

    2007-01-01

    Tänapäeva eesti kirjanduskriitikast. Vt. ka vol. 1: Kaus, Jan. Eetika, taburetiefekt ja jätkuv objektivisatsioon, Sirp, 15. juuni., lk. 7. Vastukaja: Raudam, Toomas. Arvustuse piiritused //Sirp (2007) 10. aug., lk. 9

  4. South African Journal of Higher Education - Vol 16, No 2 (2002)

    African Journals Online (AJOL)

    South African Journal of Higher Education - Vol 16, No 2 (2002) ... Rewarding quality teaching in higher education: the evading dream? ... Employers' perceptions of the profile of MBA graduates · EMAIL FULL TEXT EMAIL FULL TEXT

  5. International Journal of Natural and Applied Sciences - Vol 5, No 2 ...

    African Journals Online (AJOL)

    International Journal of Natural and Applied Sciences - Vol 5, No 2 (2009) ... Illustration of decimation in digital signal processing (DSP) systems using ... of diesel polluted soils on hydrocarbon-utilizing microbial counts and oil degradation ...

  6. Lwati: A Journal of Contemporary Research - Vol 10, No 3 (2013)

    African Journals Online (AJOL)

    Lwati: A Journal of Contemporary Research - Vol 10, No 3 (2013) ... Evaluation of Social Studies Curriculum on Compassion Dispositions in Students of ... European Trading Companies and Economic Development in the Cross River Basin of ...

  7. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  9. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  10. Baltische Musik für Streichorchester (Vol. 2) / Hans-Christian Dadelsen

    Index Scriptorium Estoniae

    Dadelsen, Hans-Christian

    1995-01-01

    Uuest heliplaadist "Baltische Musik für Streichorchester (Vol. 2). Ostrobothnian Chamber Orchestra, Juha Kangas". Finlandia/East West Records CD 4509-9789-2 (WD: 64'34") Plaadil ka Erkki-Sven Tüüri teos "Insula Deserta"

  11. Journal of Agriculture and Social Research, Vol. 13, No.1, 2013 ...

    African Journals Online (AJOL)

    Adesope

    Journal of Agriculture and Social Research, Vol. 13, No.1, 2013. 56. EFFECT .... respondents who would soon become young entrepreneurs after their training period. The .... world congress on public health, Rio de Janeiro, Brazil. Mohammed ...

  12. Proceedings of the third arab conference on the peaceful uses of atomic energy, vol.a,b

    International Nuclear Information System (INIS)

    El-Mashri, S.M.

    1998-06-01

    The publication has been set up as a textbook for peaceful uses of atomic energy vol.A: (1) reactor,materials,energy; (2) nuclear raw materials; (3) radiocesium-waste; (4) nuclear safety; (5) nuclear physics; (6) radiochemistry; (7) radiobiology; vol.B: (1) nuclear medicine; (2) agriculture and soil science; (3) isotope hydrology; (4) food preservation; (5) insect eradication; (6 )industrial application; (7) nuclear activation analysis; (8) health physics and environmental studies

  13. Proceedings of the third arab conference on the peaceful uses of atomic energy, vol.a,b

    Energy Technology Data Exchange (ETDEWEB)

    El-Mashri, S M [ed.

    1998-06-01

    The publication has been set up as a textbook for peaceful uses of atomic energy vol.A: (1) reactor,materials,energy; (2) nuclear raw materials; (3) radiocesium-waste; (4) nuclear safety; (5) nuclear physics; (6) radiochemistry; (7) radiobiology; vol.B: (1) nuclear medicine; (2) agriculture and soil science; (3) isotope hydrology; (4) food preservation; (5) insect eradication; (6 )industrial application; (7) nuclear activation analysis; (8) health physics and environmental studies.

  14. Health and safety work plan for sampling colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Marsh, J.D.; McCarthy, J.F.

    1994-07-01

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid sampling project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program manual, and applicable ORNL, Martin Marietta Energy Systems, Inc., and US Department of Energy (DOE) policies and procedures

  15. Substâncias voláteis em mel floral e mel de melato

    Directory of Open Access Journals (Sweden)

    CAMPOS Gisélia

    2000-01-01

    Full Text Available Embora pareça existir um "flavor" característico de mel, a grande variedade de flores disponíveis para a abelha, possibilita uma grande diversidade de flavor e aroma, indicando a presença de vários componentes voláteis. Alguns destes dependem da fisiologia da abelha, dos procedimentos após a colheita e no mel de melato há também a interferência de insetos sugadores e das formigas. Várias substâncias voláteis já foram identificadas, sendo algumas características de determinados méis uniflorais. Com o objetivo de encontrar uma substância volátil característica do mel de melato, seis amostras deste tipo de mel e seis amostras de mel floral foram analisadas usando extração por arraste de gás hidrogênio e cromatografia a gás acoplada a espectrometria de massas. Ácido acético foi encontrado em quatro amostras de mel de melato e em uma amostra de mel floral porém, com menor abundância.

  16. South African Journal of Animal Science - Vol 30, No 2 (2000)

    African Journals Online (AJOL)

    South African Journal of Animal Science - Vol 30, No 2 (2000) ... Relationship between performance measurements and sale price of Dorper rams in the Northern Cape ... Factors affecting goat production in a communal farming system in the ...

  17. International Journal of Arts and Humanities (IJAH) Ethiopia Vol. 7 (1 ...

    African Journals Online (AJOL)

    Prof

    2018-01-24

    Jan 24, 2018 ... International Journal of Arts and Humanities (IJAH). Ethiopia. Vol. 7 (1), S/No ... Department of International and Strategic Studies. Faculty of Arts and ..... American political science review, 98(01), 171-. 189. Stiglitz, J. (2002).

  18. Tank 241-A-104 tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of auger samples from tank 241-A-104. This Tank Characterization Plan will identify characterization objectives pertaining to sample collection, hot cell sample isolation, and laboratory analytical evaluation and reporting requirements in addition to reporting the current contents and status of the tank as projected from historical information

  19. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process

  20. Egyptian Journal of Medical Human Genetics - Vol 13, No 2 (2012)

    African Journals Online (AJOL)

    Egyptian Journal of Medical Human Genetics - Vol 13, No 2 (2012) ... as independent indicators for B-CLL: Correlation to response to treatment and disease ... Profile of disorders of sexual differentiation in the Northeast region of Cairo, Egypt ...

  1. Sophia: An African Journal of Philosophy - Vol 13, No 1 (2010)

    African Journals Online (AJOL)

    Sophia: An African Journal of Philosophy - Vol 13, No 1 (2010) ... Letting die: A moral defence · EMAIL FULL TEXT EMAIL FULL TEXT ... Corporate culture: It's impact on corporate life and business practices in ... Current Issue Atom logo

  2. Journal of Agricultural Extension Vol. 17 (1) June, 2013 ISSN 1119 ...

    African Journals Online (AJOL)

    Onyii Ogbonna

    Journal of Agricultural Extension. Vol. ... Nigeria one of the largest importers of fish in the developing world, importing ... stratum formed the third stage. ..... Quarterly. 28 (3 & 4): 8-13. Binyotubo, T.E (2011). A guide to fishing gear technology.

  3. Egyptian Journal of Medical Human Genetics - Vol 11, No 1 (2010)

    African Journals Online (AJOL)

    Egyptian Journal of Medical Human Genetics - Vol 11, No 1 (2010) ... Gene polymorphisms of TNF-α and IL-10 related to rheumatic heart disease · EMAIL ... with familial Mediterranean fever · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  4. UMTRA project water sampling and analysis plan, Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    Surface remedial action is scheduled to begin at the Naturita UMTRA Project processing site in the spring of 1994. No water sampling was performed during 1993 at either the Naturita processing site (NAT-01) or the Dry Flats disposal site (NAT-12). Results of previous water sampling at the Naturita processing site indicate that ground water in the alluvium is contaminated as a result of uranium processing activities. Baseline ground water conditions have been established in the uppermost aquifer at the Dry Flats disposal site. Water sampling activities scheduled for April 1994 include preconstruction sampling of selected monitor wells at the processing site, surface water sampling of the San Miguel River, sampling of several springs/seeps in the vicinity of the disposal site, and sampling of two monitor wells in Coke Oven Valley. The monitor well locations provide sampling points to characterize ground water quality and flow conditions in the vicinity of the sites. The list of analytes has been updated to reflect constituents related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted annually at minimum during the period of construction activities

  5. 59 East and Central African Journal of Pharmaceutical Sciences Vol ...

    African Journals Online (AJOL)

    pharm-chem

    East and Central African Journal of Pharmaceutical Sciences. Vol. 16 (2013). There is a misconception that traditional medicine is unique to developing countries of Africa, Asia and. South America. This is certainly not true. Traditional medicine, often referred to as "alternative medicine", is widely used in developed countries ...

  6. Determination of three-dimensional stress orientations in the Wenchuan earthquake Fault Scientific Drilling (WFSD) hole-1: A preliminary result by anelastic strain recovery measurements of core samples

    Science.gov (United States)

    Cui, J.; Lin, W.; Wang, L.; Tang, Z.; Sun, D.; Gao, L.; Wang, W.

    2010-12-01

    A great and destructive earthquake (Ms 8.0; Mw 7.9), Wunchuan earthquake struck on the Longmen Shan foreland trust zone in Sichuan province, China on 12 May 2008 (Xu et al., 2008; Episodes, Vol.31, pp.291-301). As a rapid response scientific drilling project, Wenchuan earthquake Fault Scientific Drilling (WFSD) started on 6 November 2008 shorter than a half of year from the date of earthquake main shock. The first pilot borehole (hole-1) has been drilled to the target depth (measured depth 1201 m MD, vertical depth 1179 m) at Hongkou, Dujianyan, Sichuan and passed through the main fault of the earthquake around 589 m MD. We are trying to determine three dimensional in-situ stress states in the WFSD boreholes by a core-based method, anelastic strain recovery (ASR) method (Lin et al., 2006; Tectonophysics, Vol4.26, pp.221-238). This method has been applied in several scientific drilling projects (TCDP: Lin et al., 2007; TAO, Vol.18, pp.379-393; NanTtoSEIZE: Byrne et al., 2009; GRL, Vol.36, L23310). These applications confirm the validity of using the ASR technique in determining in situ stresses by using drilled cores. We collected total 15 core samples in a depth range from 340 m MD to 1180 m MD, approximately for ASR measurements. Anelastic normal strains, measured every ten minutes in nine directions, including six independent directions, were used to calculate the anelastic strain tensors. The data of the ASR tests conducted at hole-1 is still undergoing analysis. As a tentative perspective, more than 10 core samples showed coherent strain recovery over one - two weeks. However, 2 or 3 core samples cannot be re-orientated to the global system. It means that we cannot rink the stress orientation determined by the core samples to geological structure. Unfortunately, a few core samples showed irregular strain recovery and were not analyzed further. The preliminary results of ASR tests at hole-1 show the stress orientations and stress regime changes a lot with the

  7. Soil sampling and analysis plan for the Bear Creek Valley floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-11-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. It is an addendum to a previously issued document, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19 ampersand D2), which presents background information pertaining to this floodplain investigation. The strategy presented in the SAP is to divide the investigation into three component parts: a large-scale characterization of the floodplain; a fine-scale characterization of the floodplain beginning with a known contaminated location; and a stream sediment characterization. During the large-scale and the fine-scale characterizations, soil and biota samples (i.e., small mammals, earthworms, and vegetation) will be collected in order to characterize the nature and extent of floodplain soil contamination and the impact of this contamination on floodplain biota. The fine-scale characterization will begin with an investigation of a site corresponding to the location noted in the Remedial Investigation Work Plan (ES/ER-19 ampersand D2) as an area where uranium and PCBs are concentrated in discrete strata. During this fine-scale characterization, a 1 m deep soil profile excavation will be dug into the creek berm, and individual soil strata in the excavation will be screened for alpha radiation, PCBs, and VOCs. After the laboratory analysis results are received, biota samples will be collected in the vicinity of those locations

  8. Organic petrology of subbituminous carbonaceous shale samples from Chalaw, Kabul Province, Afghanistan: Considerations for paleoenvironment and energy resource potential

    Energy Technology Data Exchange (ETDEWEB)

    Hackley, Paul C.; SanFilipo, John R. [U.S. Geological Survey, MS 956 National Center, Reston VA, 20192 (United States); Azizi, Gul Pacha [Afghanistan Geological Survey, Macroryan Square, Kabul (Afghanistan); Davis, Philip A. [U.S. Geological Survey, 520 N. Park Avenue, Tucson AZ, 85719 (United States); Starratt, Scott W. [U.S. Geological Survey, MS 910, 345 Middlefield Rd, Menlo Park CA, 94025 (United States)

    2010-04-01

    Neogene (?) subbituminous carbonaceous shale deposits from Chalaw, Afghanistan, were investigated through organic petrology techniques and standard coal analyses to determine paleoenvironment and potential for resource utilization. The Chalaw deposit, approximately 30 km southeast of Kabul, currently is exploited for brick making and domestic heating and cooking. Three multiple-bench channel samples of the mined bed at Chalaw were collected and evaluated. The presence of significant huminite (ranging from 0.2 to 59.0 vol.%, mineral-inclusive basis) is suggestive of a terrestrial lignin-rich precursor plant material. Measured reflectance values of 0.38-0.55% indicate subbituminous rank. This rank suggests burial depths of approximately 1500 m and maximum temperatures of approximately 50 C. Structured liptinite macerals generally are absent except for some fluorescing morphologies interpreted to be poorly-preserved root cork suberinite. Sponge spicule bioliths including gemmoscleres and megascleres are common. These petrographic observations, in addition to high mineral matter content (33 to > 95 vol.%), medium to high sulfur content (2.1-11.5 wt.%, dry basis; db), and the presence of common gastropod? shell fragments and an aragonite-needle chalk bed are consistent with, but not directly indicative of, a marginal marine or estuarine mangrove depositional environment. However, additional data are necessary to confirm this hypothesis and deposition in a freshwater environment cannot be ruled out at this time. Commercial-scale development and utilization of the Chalaw deposit as a thermal fuel resource may be possible using a fluidized bed combustion system which could accept the low-quality mine product currently produced. Samples examined herein contain high-ash yield (45-90 wt.%, db), high total moisture content (17-39 wt.%), low calorific value (980-6860 Btu/lb, m,mmf), and have poor agglomerating properties (FSI = 0), consistent with fuels utilized in fluidized

  9. Waste retrieval sluicing system vapor sampling and analysis plan for evaluation of organic emissions, process test phase III

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained to address vapor issues related to the sluicing of tank 241-C-106. Sampling will be performed in accordance with Waste Retrieval Sluicing System Emissions Collection Phase III (Jones 1999) and Process Test Plan Phase III, Waste Retrieval Sluicing System Emissions Collection (Powers 1999). Analytical requirements include those specified in Request for Ecology Concurrence on Draft Strategy/Path Forward to Address Concerns Regarding Organic Emissions from C-106 Sluicing Activities (Peterson 1998). The Waste Retrieval Sluicing System was installed to retrieve and transfer high-heat sludge from tank 241-C-106 to tank 241-AY-102, which is designed for high-heat waste storage. During initial sluicing of tank 241-C-106 in November 1998, operations were halted due to detection of unexpected high volatile organic compounds in emissions that exceeded regulatory permit limits. Several workers also reported smelling sharp odors and throat irritation. Vapor grab samples from the 296-C-006 ventilation system were taken as soon as possible after detection; the analyses indicated that volatile and semi-volatile organic compounds were present. In December 1998, a process test (phase I) was conducted in which the pumps in tanks 241-C-106 and 241-AY-102 were operated and vapor samples obtained to determine constituents that may be present during active sluicing of tank 241-C-106. The process test was suspended when a jumper leak was detected. On March 7, 1999, phase I1 of the process test was performed; the sluicing system was operated for approximately 7 hours and was ended using the controlled shutdown method when the allowable amount of solids were transferred to 241-AY-102. The phase II test was successful, however, further testing is required to obtain vapor samples at higher emission levels

  10. Bulletin of the Chemical Society of Ethiopia - Vol 23, No 1 (2009)

    African Journals Online (AJOL)

    Bulletin of the Chemical Society of Ethiopia - Vol 23, No 1 (2009) ... CHEMICAL REGENERATION OF GRANULAR ACTIVATED CARBON USED IN CITRIC ... FLUORESCENCE PROPERTIES OF 4-ACYL ISOCHROMAN-1,3-DIONES · EMAIL ...

  11. Journal of Agriculture and Social Research (JASR) - Vol 6, No 1 ...

    African Journals Online (AJOL)

    Journal of Agriculture and Social Research (JASR) - Vol 6, No 1 (2006) ... Econometric analysis of the effect of marketing costs on grain prices in Kaduna State of ... Impact of mass media on adoption of agricultural innovations in Kaduna State, ...

  12. Characterization of spatial distribution of Tetranychus urticae in peppermint in California and implication for improving sampling plan.

    Science.gov (United States)

    Rijal, Jhalendra P; Wilson, Rob; Godfrey, Larry D

    2016-02-01

    Twospotted spider mite, Tetranychus urticae Koch, is an important pest of peppermint in California, USA. Spider mite feeding on peppermint leaves causes physiological changes in the plant, which coupling with the favorable environmental condition can lead to increased mite infestations. Significant yield loss can occur in absence of pest monitoring and timely management. Understating the within-field spatial distribution of T. urticae is critical for the development of reliable sampling plan. The study reported here aims to characterize the spatial distribution of mite infestation in four commercial peppermint fields in northern California using spatial techniques, variogram and Spatial Analysis by Distance IndicEs (SADIE). Variogram analysis revealed that there was a strong evidence for spatially dependent (aggregated) mite population in 13 of 17 sampling dates and the physical distance of the aggregation reached maximum to 7 m in peppermint fields. Using SADIE, 11 of 17 sampling dates showed aggregated distribution pattern of mite infestation. Combining results from variogram and SADIE analysis, the spatial aggregation of T. urticae was evident in all four fields for all 17 sampling dates evaluated. Comparing spatial association using SADIE, ca. 62% of the total sampling pairs showed a positive association of mite spatial distribution patterns between two consecutive sampling dates, which indicates a strong spatial and temporal stability of mite infestation in peppermint fields. These results are discussed in relation to behavior of spider mite distribution within field, and its implications for improving sampling guidelines that are essential for effective pest monitoring and management.

  13. Site study plan for regional hydrologic sampling and monitoring: Preliminary draft

    International Nuclear Information System (INIS)

    Dutton, A.R.

    1987-01-01

    The purpose of the Regional Hydrologic Studies Plan is to describe those field activities required for completion of the objectives of hydrologic activities. Many of these activities are regional in scope and are designed to provide a framework for understanding the hydrologic setting of the site and the hydrologic processes that influence site characteristics. Site Study Plans (SSPs) define activates at and in the immediate vicinity of the site. The activities specified in the Regional Hydrologic Studies Plan are performed beyond the confines of the site because the hydrologic systems extend beyond the site boundaries, because pertinent data that bear on site suitability are available outside of the site, and because natural analogues exist outside of the site that allow analysis of processes that are expected to operate within the site. 15 refs., 5 figs., 1 tab

  14. Sampling and chemical analysis in environmental samples around Nuclear Power Plants and some environmental samples

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yong Woo; Han, Man Jung; Cho, Seong Won; Cho, Hong Jun; Oh, Hyeon Kyun; Lee, Jeong Min; Chang, Jae Sook [KORTIC, Taejon (Korea, Republic of)

    2002-12-15

    Twelve kinds of environmental samples such as soil, seawater, underground water, etc. around Nuclear Power Plants(NPPs) were collected. Tritium chemical analysis was tried for the samples of rain water, pine-needle, air, seawater, underground water, chinese cabbage, a grain of rice and milk sampled around NPPs, and surface seawater and rain water sampled over the country. Strontium in the soil that sere sampled at 60 point of district in Korea were analyzed. Tritium were sampled at 60 point of district in Korea were analyzed. Tritium were analyzed in 21 samples of surface seawater around the Korea peninsular that were supplied from KFRDI(National Fisheries Research and Development Institute). Sampling and chemical analysis environmental samples around Kori, Woolsung, Youngkwang, Wooljin Npps and Taeduk science town for tritium and strontium analysis was managed according to plans. Succeed to KINS after all samples were tried.

  15. Journal of Computer Science and Its Application - Vol 20, No 2 (2013)

    African Journals Online (AJOL)

    Journal of Computer Science and Its Application - Vol 20, No 2 (2013) ... Fuzzy analysis and adaptive anthropometry model for object identification in surveillance system ... Natural language processing techniques for automatic test questions ...

  16. Sorption and desorption studies of some radionuclides by soil samples. Vol. 4

    Energy Technology Data Exchange (ETDEWEB)

    El-Naggar, H A; Ezz El-Din, M R; Abd El-Gawad, A S [Hot Laborities Center, National Center for Nuclear Safety and Radiation control, Authority, Cairo (Egypt)

    1996-03-01

    The different factors influencing the sorption/desorption of {sup 137} Cs, {sup 60} Co, {sup 241} Am and {sup (152+154)}Eu by soil samples of Inshas area were investigated. Mineralogical analysis of the soil samples were carried out. The amount sorbed per gram soil (X/m) increased as the carrier concentration [C] increased from (10{sup -9} to 10{sup -}1 mol) following a freundlich type isotherm. The distribution coefficient [K d] of the radionuclides was found to be affected by pH. The presence of K{sup +}, Ca{sup 2+}, and Fe{sup 3+} as competing ions decreases the sorption capacity of the radioisotopes studied. The presence of complexing agents has a significant effect on the mobility of these radioisotopes. On the basis of the results obtained an attempt is being carried out to calculate different transport rates of the relevant isotopes in the investigated media. The mathematical model for the dispersion of the radioisotopes investigated in the groundwater environment was also elucidated. 4 figs., 2 tabs.

  17. Wildlife Conservation Planning Using Stochastic Optimization and Importance Sampling

    Science.gov (United States)

    Robert G. Haight; Laurel E. Travis

    1997-01-01

    Formulations for determining conservation plans for sensitive wildlife species must account for economic costs of habitat protection and uncertainties about how wildlife populations will respond. This paper describes such a formulation and addresses the computational challenge of solving it. The problem is to determine the cost-efficient level of habitat protection...

  18. Sampling and Analysis Plan for Disposition of the Standing Legacy Wastes in the 105-B, -D, -H, -KE, and -KW Reactor Buildings

    International Nuclear Information System (INIS)

    McGuire, J. J.

    1999-01-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities that support disposition of legacy waste in the Hanford Site's 105-B, 105-D, 105-H,105-KE, 105-KW Reactor buildings. For the purpose of this SAP, legacy waste is identified as any item present in a facility that is not permanently attached to the facility and is easily removed without the aid of equipment larger than a standard forklift

  19. Sampling and Analysis Plan for Disposition of the Standing Legacy Wastes in the 105-B, -D, -H, -KE, and -KW Reactor Buildings

    International Nuclear Information System (INIS)

    McGuire, J.J.

    1999-01-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities that support disposition of legacy waste in the Hanford Site's 105-B, 105-D, 105-H, 105-KE, 105-KW Reactor buildings. For the purpose of this SAP, legacy waste is identified as any item present in a facility that is not permanently attached to the facility and is easily removed without the aid of equipment larger than a standard forklift

  20. MANHATTAN DISTRICT HISTORY PROJECT Y THE LOS ALAMOS PROJECT VOL. I INCEPTION UNTIL AUGUST 1945

    Energy Technology Data Exchange (ETDEWEB)

    Hawkins, D.

    1961-12-01

    THESE TWO VOLUMES CONSTITUTE A RECORD OF THE TECHNICAL, ADMINISTRATIVE , AND POLICY-MAKING ACTIVITIES OF THE LOS ALAMOS PROJECT (PROJECT Y) FROM ITS INCEPTION UNDER THE MANHATTAN DISTRICT THROUGH THE DEVELOPMENT OF THE ATOMIC BOMB (VOL. I), AND DURING THE PERIOD FOLLOWING THE END OF WORLD WAR II UNTIL THE MANHATTAN DISTRICT RELINQUISHED CONTROL TO THE ATOMIC ENERGY COMMISSION AS OF JANUARY 1947 (VOL. II). ALTHOUGH SECURITY REGULATIONS HAVE REQUIRED SOME DELETIONS IN THE ORIGINAL TEXT OF THE TWO VOLUMES, EVERY EFFORT HAS BEEN MADE TO RETAIN THE ORIGINAL LANGUAGE AND EXPRESSIONS OF THE AUTHORS.

  1. Siim Nestor soovitab : Tallinn Doom Night vol.1. Odessa Pop / Siim Nestor

    Index Scriptorium Estoniae

    Nestor, Siim, 1974-

    2006-01-01

    Soome doom-metal ansambel Reverend Bizarre üritusel "Tallinn Doom Night vol.1" 8. dets. klubis Rockstar's. Indipoppi viljelev Rootsi duo My Darling Yoy! üritusel "Odessa Pop" 9. dets. Tallinnas klubis KuKu

  2. Sample-Based Motion Planning in High-Dimensional and Differentially-Constrained Systems

    Science.gov (United States)

    2010-02-01

    path planning and motion primitives to enable crawling gaits on rough terrain e.g. [Rebula et al., 2007, Kolter et al., 2008,Pongas et al., 2007,Ratliff...demonstrating robust planning and locomotion over quite challenging terrain (e.g., [Rebula et al., 2007, Kolter et al., 2008, Pongas et al., 2007, Zucker, 2009...and Systems. [ Kolter et al., 2008] Kolter , J. Z., Rodgers, M. P., and Ng, A. Y. (2008). A control architecture for quadruped locomotion over rough

  3. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  6. ASJP_vol11_Special_Issue_2013 ODD SIZE NEW.indd

    African Journals Online (AJOL)

    opperwjj

    African Safety Promotion Journal, Vol. 11, No. ... ABSTRACT. This article takes as its starting point that crime fiction is a public and political response to ... Finally, Hart, Orford's hard-boiled female detective figure, is assessed to ..... Four of Orford's Clare Hart novels are situated in the Cape where Anene Booysen died. In.

  7. Statistical methods for the planning of inspections

    International Nuclear Information System (INIS)

    Hough, C.G.; Beetle, T.M.

    1976-01-01

    Inspection plans are designed to detect diversions of M kilograms of nuclear material with a high degree of confidence. Attribute sample plans were first developed and applied at a zero-energy fast reactor in the United Kingdom in co-operation with the Agency. Battelle-Northwest in the United States of America proposed a variables sample plan based on decision theory. The Karlsruhe Research Center in the Federal Republic of Germany developed the strategic points concept and sample plans based on game theory considerations. All these approaches were combined into a common approach which is summarized in this report. (author)

  8. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  9. Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995

    International Nuclear Information System (INIS)

    1994-10-01

    This plan provides a description of the groundwater and surface-water quality monitoring activities planned for calendar year (CY) 1995 at the Department of Energy Y-12 Plant. Included in this plan are the monitoring activities managed by the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Other groundwater and surface water monitoring activities (e.g. selected Environmental Restoration Program activities, National Pollution Discharge Elimination System (NPDES) monitoring) not managed through the Y-12 Plant GWPP are not addressed in this report. Several monitoring programs will be implemented in three hydrogeologic regimes: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. For various reasons, modifications to the 1995 monitoring programs may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected wells, or wells could be added to or deleted from the monitoring network. All modifications to the monitoring programs will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  10. Triangular Geometrized Sampling Heuristics for Fast Optimal Motion Planning

    Directory of Open Access Journals (Sweden)

    Ahmed Hussain Qureshi

    2015-02-01

    Full Text Available Rapidly-exploring Random Tree (RRT-based algorithms have become increasingly popular due to their lower computational complexity as compared with other path planning algorithms. The recently presented RRT* motion planning algorithm improves upon the original RRT algorithm by providing optimal path solutions. While RRT determines an initial collision-free path fairly quickly, RRT* guarantees almost certain convergence to an optimal, obstacle-free path from the start to the goal points for any given geometrical environment. However, the main limitations of RRT* include its slow processing rate and high memory consumption, due to the large number of iterations required for calculating the optimal path. In order to overcome these limitations, we present another improvement, i.e, the Triangular Geometerized-RRT* (TG-RRT* algorithm, which utilizes triangular geometrical methods to improve the performance of the RRT* algorithm in terms of the processing time and a decreased number of iterations required for an optimal path solution. Simulations comparing the performance results of the improved TG-RRT* with RRT* are presented to demonstrate the overall improvement in performance and optimal path detection.

  11. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    Science.gov (United States)

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  12. Automated sample plan selection for OPC modeling

    Science.gov (United States)

    Casati, Nathalie; Gabrani, Maria; Viswanathan, Ramya; Bayraktar, Zikri; Jaiswal, Om; DeMaris, David; Abdo, Amr Y.; Oberschmidt, James; Krause, Andreas

    2014-03-01

    It is desired to reduce the time required to produce metrology data for calibration of Optical Proximity Correction (OPC) models and also maintain or improve the quality of the data collected with regard to how well that data represents the types of patterns that occur in real circuit designs. Previous work based on clustering in geometry and/or image parameter space has shown some benefit over strictly manual or intuitive selection, but leads to arbitrary pattern exclusion or selection which may not be the best representation of the product. Forming the pattern selection as an optimization problem, which co-optimizes a number of objective functions reflecting modelers' insight and expertise, has shown to produce models with equivalent quality to the traditional plan of record (POR) set but in a less time.

  13. Improvement of sampling plans for Salmonella detection in pooled table eggs by use of real-time PCR

    DEFF Research Database (Denmark)

    Pasquali, Frédérique; De Cesare, Alessandra; Valero, Antonio

    2014-01-01

    Eggs and egg products have been described as the most critical food vehicles of salmonellosis. The prevalence and level of contamination of Salmonella on table eggs are low, which severely affects the sensitivity of sampling plans applied voluntarily in some European countries, where one to five...... pools of 10 eggs are tested by the culture based reference method ISO 6579:2004. In the current study we have compared the testing-sensitivity of the reference culture method ISO 6579:2004 and an alternative real-time PCR method on Salmonella contaminated egg-pool of different sizes (4-9 uninfected eggs...... mixed with one contaminated egg) and contamination levels (10°-10(1), 10(1)-10(2), 10(2)-10(3)CFU/eggshell). Two hundred and seventy samples corresponding to 15 replicates per pool size and inoculum level were tested. At the lowest contamination level real-time PCR detected Salmonella in 40...

  14. Soil-structure interaction Vol.3. Influence of ground water

    Energy Technology Data Exchange (ETDEWEB)

    Costantino, C J

    1986-04-01

    This study has been performed for the Nuclear Regulatory Commission (NRC) by the Structural Analysis Division of Brookhaven National Laboratory (BNL). The study was conducted during the fiscal year 1965 on the program entitled 'Benchmarking of Structural Engineering Problems' sponsored by NRC. The program considered three separate but complementary problems, each associated with the soil-structure interaction (551) phase of the seismic response analysis of nuclear plant facilities. The reports, all entitled Soil-Structure Interaction, are presented in three separate volumes, namely: Vol. 1 Influence of Layering by AJ Philippacopoulos, Vol. 2 Influence of Lift-Off by C.A. Miller, Vol. 3 Influence of Ground Water by C.J. Costantino. The two problems presented in Volumes 2 and 3 were conducted at the City University of New York (CUNY) under subcontract to BNL. This report, Volume 3 of the report, presents a summary of the first year's effort on the subject of the influence of foundation ground water on the SSI phenomenon. A finite element computer program was developed for the two-phased formulation of the combined soil-water problem. This formulation is based on the Biot dynamic equations of motion for both the solid and fluid phases of a typical soil. Frequency dependent interaction coefficients were generated for the two-dimensional plane problem of a rigid surface footing moving against a saturated linear soil. The results indicate that interaction coefficients are significantly modified as compared to the comparable values for a dry soil, particularly for the rocking mode of response. Calculations were made to study the impact of the modified interaction coefficients on the response of a typical nuclear reactor building. The amplification factors for a stick model placed atop a dry and saturated soil were computed. It was found that pore water caused the rocking response to decrease and translational response to increase over the frequency range of interest, as

  15. Tank 241-C-101 tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-101

  16. Tank 241-U-111 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-U-111

  17. Tank 241-C-105 tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-105

  18. Tank 241-BY-106 tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, PNL 325 Analytical Chemistry Laboratory, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BY-106

  19. Tank 241-BX-104 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-BX-104

  20. Tank 241-AP-107 tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-AP-107

  1. Tank 241-AX-104 tank characterization plan

    International Nuclear Information System (INIS)

    Sathyanarayana, P.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of auger samples from tank 241-AX-104

  2. Tank 241-AX-102 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of auger samples from tank 241-AX-102

  3. Tank 241-U-103 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-U-103

  4. Tank 241-TX-118 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1994-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TX-118

  5. Tank 241-T-111 tank characterization plan

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-T-111

  6. Tank 241-TY-101 Tank Characterization Plan

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TY-101

  7. Tank 241-T-107 tank characterization plan

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-T-107

  8. Análisis de los compuestos volátiles de la ciruela amarilla (Prunus domestica L. ssp. domestica

    Directory of Open Access Journals (Sweden)

    Yineth Ruiz

    2011-01-01

    Full Text Available El aroma de las frutas se debe a los constituyentes volátiles presentes que, aunque se encuentran en muy bajas concentraciones, contribuyen al aroma global en grados muy diversos. Se hace necesario usar técnicas de aislamiento y concentración que garanticen el análisis de una composición química semejante a la de la fruta. Este trabajo tuvo como objetivo el análisis de los compuestos volátiles de la ciruela amarilla (Prunus domestica L. ssp. domestica por el método de evaporación del aroma asistida por solvente (SAFE. Este método utiliza un equipo de destilación conectado a una bomba de alto vacío que ofrece la posibilidad de aislar rápidamente compuestos volátiles sin daño térmico en diferentes matrices alimentarias. La separación e identificación de los compuestos volátiles se realizó por cromatografía de gases-espectrometría de masas (GC-MS. Se identificaron 47 compuestos (6,55 mg/kg de pulpa de fruta, entre ellos 14 alcoholes, 8 aldehídos, 7 ésteres, 5 cetonas, 4 ácidos carboxílicos, 4 hidrocarburos aromáticos, 3 lactonas, un compuesto azufrado y una hidroxicetona; 16 de ellos se informan por primera vez. El acetato de etilo (2,88 mg/kg, etanol (1 mg/kg y ácido octanoico (0,78 mg/kg fueron los constituyentes volátiles mayoritarios de esta variedad de ciruela.

  9. Análisis de los compuestos volátiles de la ciruela amarilla (Prunus domestica L. ssp. domestica

    Directory of Open Access Journals (Sweden)

    Yineth Ruiz

    2011-06-01

    Full Text Available El aroma de las frutas se debe a los constituyentes volátiles presentes que, aunque se encuentran en muy bajas concentraciones, contribuyen al aroma global en grados muy diversos. Se hace necesario usar técnicas de aislamiento y concentración que garanticen el análisis de una composición química semejante a la de la fruta. Este trabajo tuvo como objetivo el análisis de los compuestos volátiles de la ciruela amarilla (Prunus domestica L. ssp.domestica por el método de evaporación del aroma asistida por solvente (SAFE. Este método utiliza un equipo de destilación conectado a una bomba de alto vacío que ofrece la posibilidad de aislar rápidamente compuestos volátiles sin daño térmico en diferentes matrices alimentarias. La separación e identificación de los compuestos volátiles se realizó por cromatografía de gases-espectrometría de masas (GC-MS. Se identificaron 47 compuestos (6,55 mg/kg de pulpa de fruta, entre ellos 14 alcoholes, 8 aldehídos, 7 ésteres, 5 cetonas, 4 ácidos carboxílicos, 4 hidrocarburos aromáticos, 3 lactonas, un compuesto azufrado y una hidroxicetona; 16 de ellos se informan por primera vez. El acetato de etilo (2,88 mg/kg, etanol (1 mg/kg y ácido octanoico (0,78 mg/kg fueron los constituyentes volátiles mayoritarios de esta variedad de ciruela.

  10. Journal of Agriculture, Forestry and the Social Sciences - Vol 5, No 2 ...

    African Journals Online (AJOL)

    Journal of Agriculture, Forestry and the Social Sciences - Vol 5, No 2 (2007) ... Marketing Of Bushmeat In Peri-Urban Areas Of Ibadan Metropolis Of Oyo State, ... Sport Fisheries Potentials Of Agbokim Waterfalls, Cross River State, Nigeria ...

  11. Bulletin of the Chemical Society of Ethiopia - Vol 3, No 2 (1989)

    African Journals Online (AJOL)

    Bulletin of the Chemical Society of Ethiopia - Vol 3, No 2 (1989) ... Synthesis and characterization of gold (III) halide complexes of some pyridine ... Molluscicidal activities of some alkaloids · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  12. Bulletin of the Chemical Society of Ethiopia - Vol 27, No 3 (2013)

    African Journals Online (AJOL)

    Bulletin of the Chemical Society of Ethiopia - Vol 27, No 3 (2013) ... of the psychoactive phenylpropylamino alkaloids of khat (Catha edulis Forsk) chewing ... Synthesis and characterization of CdTe quantum dots by one-step method · EMAIL ...

  13. Tanzania Dental Journal Vol. 14 No. 1, May 2007 In vitro efficacy of ...

    African Journals Online (AJOL)

    user

    2007-05-30

    May 30, 2007 ... Tanzania Dental Journal Vol. 14 No. ... 2 Centre for Stomatological Research, School of Dentistry, University of Pretoria, Pretoria, South Africa. ..... Interestingly, clinical trials .... International Organization for Standardization,.

  14. Estudo comparativo dos óleos voláteis de algumas espécies de Piperaceae

    Directory of Open Access Journals (Sweden)

    J.M.O. Mesquita

    Full Text Available O presente trabalho teve por objetivo a análise comparativa dos óleos voláteis de espécies da família Piperaceae. As espécies estudadas foram as seguintes: Piper aduncum, P. amalago, P. arboreum, P. cernuum, P. hispidum, P. regnelii, P. submarginalum, P. vicosanum e Pothomorphe umbellata. A análise dos óleos voláteis foi efetuada pela combinação de técnicas de Cromatografia de Fase Gasosa (CG e de Cromatografia de Fase Gasosa acoplada a Espectrometria de Massa (CG/EM. A porcentagem de identificação dos constituintes nas análises dos óleos voláteis de Piper aduncum, P. amalago, P. vicosanum, P. submarginalum e Pothomorphe umbellata, atingiu valores superiores a 80%. Houve predominância de compostos de natureza sesquiterpênica nas composições químicas das espécies analisadas, com exceção de P. hispidum, P. submarginalum e P. vicosanum onde a predominância na composição foi de monoterpenos. Pelos dados apresentados observou-se que, dentre os compostos majoritários, os mais freqüentes, nas 9 espécies estudadas, foram beta-pineno (9/9 e espatulenol (9/9, seguidos por E-cariofileno (8/9, óxido de cariofileno (8/9, germacreno D (7/9, alfa-pineno (7/9 e limoneno (6/9. Pela primeira vez se relata a composição dos óleos voláteis de P. submarginalum e P vicosanum.

  15. Journal of Medicine and Biomedical Research - Vol 14, No 1 (2015)

    African Journals Online (AJOL)

    Journal of Medicine and Biomedical Research - Vol 14, No 1 (2015) ... Histopathological effects of oral and subcutaneous administration of Roselle Calyx ... Ameliorative effect of Vitamin C on lead induced hepatotoxicty in rats · EMAIL ... Effect of Hibiscus sabdariffa calyx extract on stressed rabbit plasma cholesterol status ...

  16. Mars Sample Return Architecture Overview

    Science.gov (United States)

    Edwards, C. D.; Vijendran, S.

    2018-04-01

    NASA and ESA are exploring potential concepts for a Sample Retrieval Lander and Earth Return Orbiter that could return samples planned to be collected and cached by the Mars 2020 rover mission. We provide an overview of the Mars Sample Return architecture.

  17. Supersymmetric mechanics. Vol. 2. The attractor mechanism and space time singularities

    International Nuclear Information System (INIS)

    Bellucci, S.; Marrani, A.; Ferrara, S.

    2006-01-01

    This is the second volume in a series of books on the general theme of Supersymmetric Mechanics; the series is based on lectures and discussions held in 2005 and 2006 at the INFN-Laboratori Nazionali di Frascati. The first volume appears as Lect. Notes Physics, Vol. 698 ''Supersymmetric Mechanics, Vol.1: Supersymmetry, Noncommutativity and Matrix Models'' (2006) ISBN: 3-540-33313-4. The present extensive lecture supplies a pedagogical introduction, at the non-expert level, to the attractor mechanism in space-time singularities. In such a framework, supersymmetry seems to be related to dynamical systems with fixed points, describing the equilibrium state and the stability features of the thermodynamics of black holes. After a qualitative overview, explicit examples realizing the attractor mechanism are treated at some length; they include relevant cases of asymptotically flat, maximal and non-maximal, extended supergravities in 4 and 5 dimensions. A number of recent advances along various directions of research on the attractor mechanism are also given. (orig.)

  18. Sampling and analysis plan for Mount Plant D ampersand D soils packages, Revision 1

    International Nuclear Information System (INIS)

    1991-02-01

    There are currently 682 containers of soils in storage at Mound Plant, generated between April 1 and October 31, 1990 as a result of excavation of soils containing plutonium-238 at two ongoing Decontamination and Decommissioning (D ampersand D) Program sites. These areas are known as Area 14, the waste transfer system (WTS) hillside, and Area 17, the Special Metallurgical (SM) Building area. The soils from these areas are part of Mound Plant waste stream number AMDM-000000010, Contaminated Soil, and are proposed for shipment to the Nevada Test Site (NTS) for disposal as low-level radioactive waste. The sealed waste packages, constructed of either wood or metal, are currently being stored in Building 31 and at other locations throughout the Mound facility. At a meeting in Las Vegas, Nevada on October, 26, 1990, DOE Nevada Operations Office (DOE-NV) and NTS representatives requested that the Mound Plant D ampersand D soils proposed for shipment to NTS be sampled for Toxicity Characteristic Leaching Procedure (TCLP) constituents. On December 14, 1990, DOE-NV also requested that additional analyses be performed on the soils from one of the soils boxes for polychlorinated biphenyls (PCBs), particle size distribution, and free liquids. The purpose of this plan is to document the proposed sampling and analyses of the packages of D ampersand D soils produced prior to October 31, 1990. In order to provide a thorough description of the soils excavated from the WTS and SM areas, sections 1.1 and 1.2 provide historical Information concerning the D ampersand D soils, including waste stream evaluations and past sampling data

  19. EJOTMAS: Ekpoma Journal of Theatre and Media Arts - Vol 4, No 1 ...

    African Journals Online (AJOL)

    EJOTMAS: Ekpoma Journal of Theatre and Media Arts - Vol 4, No 1-2 (2013) ... Dance for children: a functional education for national growth · EMAIL FREE FULL ... From 'folkism' to performance: a new scenic strategy for audience integration ...

  20. Tank 241-TX-105 tank characterization plan

    International Nuclear Information System (INIS)

    Carpenter, B.C.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TX-105