WorldWideScience

Sample records for safety review document

  1. ESRS guidelines for software safety reviews. Reference document for the organization and conduct of Engineering Safety Review Services (ESRS) on software important to safety in nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    The IAEA provides safety review services to assist Member States in the application of safety standards and, in particular, to evaluate and facilitate improvements in nuclear power plant safety performance. Complementary to the Operational Safety Review Team (OSART) and the International Regulatory Review Team (IRRT) services are the Engineering Safety Review Services (ESRS), which include reviews of siting, external events and structural safety, design safety, fire safety, ageing management and software safety. Software is of increasing importance to safety in nuclear power plants as the use of computer based equipment and systems, controlled by software, is increasing in new and older plants. Computer based devices are used in both safety related applications (such as process control and monitoring) and safety critical applications (such as reactor protection). Their dependability can only be ensured if a systematic, fully documented and reviewable engineering process is used. The ESRS on software safety are designed to assist a nuclear power plant or a regulatory body of a Member State in the review of documentation relating to the development, application and safety assessment of software embedded in computer based systems important to safety in nuclear power plants. The software safety reviews can be tailored to the specific needs of the requesting organization. Examples of such reviews are: project planning reviews, reviews of specific issues and reviews prior final acceptance. This report gives information on the possible scope of ESRS software safety reviews and guidance on the organization and conduct of the reviews. It is aimed at Member States considering these reviews and IAEA staff and external experts performing the reviews. The ESRS software safety reviews evaluate the degree to which software documents show that the development process and the final product conform to international standards, guidelines and current practices. Recommendations are

  2. Documents preparation and review

    International Nuclear Information System (INIS)

    1999-01-01

    Ignalina Safety Analysis Group takes active role in assisting regulatory body VATESI to prepare various regulatory documents and reviewing safety reports and other documentation presented by Ignalina NPP in the process of licensing of unit 1. The list of main documents prepared and reviewed is presented

  3. Criteria Document for B-plant's Surveillance and Maintenance Phase Safety Basis Document

    International Nuclear Information System (INIS)

    SCHWEHR, B.A.

    1999-01-01

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S and M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S and M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S and M Phase safety basis document

  4. LESSONS LEARNED IN DEVELOPMENT OF THE HANFORD SWOC MASTER DOCUMENTED SAFETY ANALYSIS (MDSA) and IMPLEMENTATION VALIDATION REVIEW (IVR)

    International Nuclear Information System (INIS)

    MORENO, M.R.

    2004-01-01

    DOE set clear expectations on a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (20 CFR 830, Nuclear Safety Rule), which ensured long-term benefit to Hanford, via issuance of a nuclear safety strategy in February 2003. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development with the goal of a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was approved to standardize methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was approved for the evaluation of radiological consequences for accident scenarios often postulated at Hanford. Standard safety management program chapters were approved for use as a means of compliance with the programmatic chapters of DOE-STD-3009, ''Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports''. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. The new Documented Safety Analysis (DSA) developed to address the operations of four facilities within the Solid Waste Operations Complex (SWOC) necessitated development of an Implementation Validation Review (IVR) process. The IVR process encompasses the following objectives: safety basis controls and requirements are adequately incorporated into appropriate facility documents and work instructions, facility personnel are knowledgeable of controls and requirements, and the DSA/TSR controls have been implemented. Based on DOE direction and safety analysis tools, four waste management nuclear facilities were integrated into one safety basis document. With successful completion of implementation of this safety document, lessons-learned from the in-process review, safety analysis tools and IVR process were documented for future action

  5. ITER final design report, cost review and safety analysis (FDR) and relevant documents

    International Nuclear Information System (INIS)

    1999-01-01

    This volume contains the fourth major milestone report and documents associated with its acceptance, review and approval. This ITER Final Design Report, Cost Review and Safety Analysis was presented to the ITER Council at its 13th meeting in February 1998 and was approved at its extraordinary meeting on 25 June 1998. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics and schedule and cost estimates are given

  6. Generic safety documentation model

    International Nuclear Information System (INIS)

    Mahn, J.A.

    1994-04-01

    This document is intended to be a resource for preparers of safety documentation for Sandia National Laboratories, New Mexico facilities. It provides standardized discussions of some topics that are generic to most, if not all, Sandia/NM facilities safety documents. The material provides a ''core'' upon which to develop facility-specific safety documentation. The use of the information in this document will reduce the cost of safety document preparation and improve consistency of information

  7. Reviewing industrial safety in nuclear power plants

    International Nuclear Information System (INIS)

    1990-02-01

    This document contains guidance and reference materials for Operational Safety Review Team (OSART) experts, in addition to the OSART Guidelines (TECDOC-449), for use in the review of industrial safety activities at nuclear power plants. It sets out objectives for an excellent industrial safety programme, and suggests investigations which should be made in evaluating industrial safety programmes. The attributes of an excellent industrial safety programme are listed as examples for comparison. Practical hints for reviewing industrial safety are discussed, so that the necessary information can be obtained effectively through a review of documents and records, discussions with counterparts, and field observations. There are several annexes. These deal with major features of industrial safety programmes such as safety committees, reporting and investigation systems and first aid and medical facilities. They include some examples which are considered commendable. The document should be taken into account not only when reviewing management, organization and administration but also in the review of related areas, such as maintenance and operations, so that all aspects of industrial safety in an operating nuclear power plant are covered

  8. Review of Policy Documents for Nuclear Safety and Regulation

    International Nuclear Information System (INIS)

    Kim, Woong Sik; Choi, Kwang Sik; Choi, Young Sung; Kim, Hho Jung; Kim, Ho Ki

    2006-01-01

    The goal of regulation is to protect public health and safety as well as environment from radiological hazards that may occur as a result of the use of atomic energy. In September 1994, the Korean government issued the Nuclear Safety Policy Statement (NSPS) to establish policy goals of maintaining and achieving high-level of nuclear safety and also help the public understand the national policy and a strong will of the government toward nuclear safety. It declares the importance of establishing safety culture in nuclear community and also specifies five nuclear regulatory principles (Independence, Openness, Clarity, Efficiency and Reliability) and provides the eleven regulatory policy directions. In 2001, the Nuclear Safety Charter was declared to make the highest goal of safety in driving nuclear business clearer; to encourage atomic energy- related institutions and workers to keep in mind the mission and responsibility for assuring safety; to guarantee public confidence in related organizations. The Ministry of Science and Technology (MOST) also issues Yearly Regulatory Policy Directions at the beginning of every year. Recently, the third Atomic Energy Promotion Plan (2007-2011) has been established. It becomes necessary for the relevant organizations to prepare the detailed plans on such areas as nuclear development, safety management, regulation, etc. This paper introduces a multi-level structure of nuclear safety and regulation policy documents in Korea and presents some improvements necessary for better application of the policies

  9. Review of Policy Documents for Nuclear Safety and Regulation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woong Sik; Choi, Kwang Sik; Choi, Young Sung; Kim, Hho Jung; Kim, Ho Ki [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of)

    2006-07-01

    The goal of regulation is to protect public health and safety as well as environment from radiological hazards that may occur as a result of the use of atomic energy. In September 1994, the Korean government issued the Nuclear Safety Policy Statement (NSPS) to establish policy goals of maintaining and achieving high-level of nuclear safety and also help the public understand the national policy and a strong will of the government toward nuclear safety. It declares the importance of establishing safety culture in nuclear community and also specifies five nuclear regulatory principles (Independence, Openness, Clarity, Efficiency and Reliability) and provides the eleven regulatory policy directions. In 2001, the Nuclear Safety Charter was declared to make the highest goal of safety in driving nuclear business clearer; to encourage atomic energy- related institutions and workers to keep in mind the mission and responsibility for assuring safety; to guarantee public confidence in related organizations. The Ministry of Science and Technology (MOST) also issues Yearly Regulatory Policy Directions at the beginning of every year. Recently, the third Atomic Energy Promotion Plan (2007-2011) has been established. It becomes necessary for the relevant organizations to prepare the detailed plans on such areas as nuclear development, safety management, regulation, etc. This paper introduces a multi-level structure of nuclear safety and regulation policy documents in Korea and presents some improvements necessary for better application of the policies.

  10. Advanced Photon Source experimental beamline Safety Assessment Document: Addendum to the Advanced Photon Source Accelerator Systems Safety Assessment Document (APS-3.2.2.1.0)

    International Nuclear Information System (INIS)

    1995-01-01

    This Safety Assessment Document (SAD) addresses commissioning and operation of the experimental beamlines at the Advanced Photon Source (APS). Purpose of this document is to identify and describe the hazards associated with commissioning and operation of these beamlines and to document the measures taken to minimize these hazards and mitigate the hazard consequences. The potential hazards associated with the commissioning and operation of the APS facility have been identified and analyzed. Physical and administrative controls mitigate identified hazards. No hazard exists in this facility that has not been previously encountered and successfully mitigated in other accelerator and synchrotron radiation research facilities. This document is an updated version of the APS Preliminary Safety Analysis Report (PSAR). During the review of the PSAR in February 1990, the APS was determined to be a Low Hazard Facility. On June 14, 1993, the Acting Director of the Office of Energy Research endorsed the designation of the APS as a Low Hazard Facility, and this Safety Assessment Document supports that designation

  11. Nuclear Safety Review for the Year 2012

    International Nuclear Information System (INIS)

    2012-07-01

    The Nuclear Safety Review for the Year 2012 contains an analytical overview of the dominant trends, issues and challenges worldwide in 2011 and the Agency's efforts to strengthen the global nuclear safety framework. This year's report also highlights issues and activities related to the accident at the Fukushima Daiichi nuclear power plant. The analytical overview is supported by the Appendix at the end of this document, entitled: The IAEA Safety Standards: Activities during 2011. A draft version of the Nuclear Safety Review for the Year 2012 was submitted to the March 2012 session of the Board of Governors in document GOV/2012/6. The final version of the Nuclear Safety Review for the Year 2012 was prepared in light of the discussions held during the Board of Governors and also of the comments received.

  12. Regulatory review of safety cases and safety assessments - associated challenges

    International Nuclear Information System (INIS)

    Bennett, D.G.; Ben Belfadhel, M.; Metcalf, P.E.

    2006-01-01

    Regulatory reviews of safety cases and safety assessments are essential for credible decision making on the licensing or authorization of radioactive waste disposal facilities. Regulatory review also plays an important role in developing the safety case and in establishing stakeholders' confidence in the safety of the facility. Reviews of safety cases for radioactive waste disposal facilities need to be conducted by suitably qualified and experienced staff, following systematic and well planned review processes. Regulatory reviews should be sufficiently comprehensive in their coverage of issues potentially affecting the safety of the disposal system, and should assess the safety case against clearly established criteria. The conclusions drawn from a regulatory review, and the rationale for them should be reproducible and documented in a transparent and traceable way. Many challenges are faced when conducting regulatory reviews of safety cases. Some of these relate to issues of project and programme management, and resources, while others derive from the inherent difficulties of assessing the potential long term future behaviour of engineered and environmental systems. The paper describes approaches to the conduct of regulatory reviews and discusses some of the challenges faced. (author)

  13. Review of SKB's Code Documentation and Testing

    International Nuclear Information System (INIS)

    Hicks, T.W.

    2005-01-01

    SKB is in the process of developing the SR-Can safety assessment for a KBS 3 repository. The assessment will be based on quantitative analyses using a range of computational codes aimed at developing an understanding of how the repository system will evolve. Clear and comprehensive code documentation and testing will engender confidence in the results of the safety assessment calculations. This report presents the results of a review undertaken on behalf of SKI aimed at providing an understanding of how codes used in the SR 97 safety assessment and those planned for use in the SR-Can safety assessment have been documented and tested. Having identified the codes us ed by SKB, several codes were selected for review. Consideration was given to codes used directly in SKB's safety assessment calculations as well as to some of the less visible codes that are important in quantifying the different repository barrier safety functions. SKB's documentation and testing of the following codes were reviewed: COMP23 - a near-field radionuclide transport model developed by SKB for use in safety assessment calculations. FARF31 - a far-field radionuclide transport model developed by SKB for use in safety assessment calculations. PROPER - SKB's harness for executing probabilistic radionuclide transport calculations using COMP23 and FARF31. The integrated analytical radionuclide transport model that SKB has developed to run in parallel with COMP23 and FARF31. CONNECTFLOW - a discrete fracture network model/continuum model developed by Serco Assurance (based on the coupling of NAMMU and NAPSAC), which SKB is using to combine hydrogeological modelling on the site and regional scales in place of the HYDRASTAR code. DarcyTools - a discrete fracture network model coupled to a continuum model, recently developed by SKB for hydrogeological modelling, also in place of HYDRASTAR. ABAQUS - a finite element material model developed by ABAQUS, Inc, which is used by SKB to model repository buffer

  14. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  15. Guidelines for the review research reactor safety. Reference document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    1997-01-01

    In 1992, the IAEA published new safety standards for research reactors as part of the set of publications considered by its Research Reactor Safety Programme (RRSP). This set also includes publications giving guidance for all safety aspects related to the lifetime of a research reactor. In addition, the IAEA has also revised the Safety Standards for radiation protection. Consequently, it was considered advisable to revise the Integrated Safety Assessment of Research Reactors (INSARR) procedures to incorporate the new requirements and guidance as well as to extend the scope of the safety reviews to currently operating research reactors. The present report is the result of this revision. The purpose of this report is to give guidance on the preparation, execution, reporting and follow-up of safety review mission to research reactors as conducted by the IAEA under its INSARR missions safety service. However, it will also be of assistance to operators and regulators in conducting: (a) ad hoc safety assessments of research reactors to address individual issues such as ageing or safety culture; and (b) other types of safety reviews such as internal and peer reviews and regulatory inspections

  16. Using resources for scientific-driven pharmacovigilance: from many product safety documents to one product safety master file.

    Science.gov (United States)

    Furlan, Giovanni

    2012-08-01

    Current regulations require a description of the overall safety profile or the specific risks of a drug in multiple documents such as the Periodic and Development Safety Update Reports, Risk Management Plans (RMPs) and Signal Detection Reports. In a resource-constrained world, the need for preparing multiple documents reporting the same information results in shifting the focus from a thorough scientific and medical evaluation of the available data to maintaining compliance with regulatory timelines. Since the aim of drug safety is to understand and characterize product issues to take adequate risk minimization measures rather than to comply with bureaucratic requirements, there is the need to avoid redundancy. In order to identify core drug safety activities that need to be undertaken to protect patient safety and reduce the number of documents reporting the results of these activities, the author has reviewed the main topics included in the drug safety guidelines and templates. The topics and sources that need to be taken into account in the main regulatory documents have been found to greatly overlap and, in the future, as a result of the new Periodic Safety Update Report structure and requirements, in the author's opinion this overlap is likely to further increase. Many of the identified inter-document differences seemed to be substantially formal. The Development Safety Update Report, for example, requires separate presentation of the safety issues emerging from different sources followed by an overall evaluation of each safety issue. The RMP, instead, requires a detailed description of the safety issues without separate presentation of the evidence derived from each source. To some extent, however, the individual documents require an in-depth analysis of different aspects; the RMP, for example, requires an epidemiological description of the indication for which the drug is used and its risks. At the time of writing this article, this is not specifically

  17. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  18. Nuclear Safety Review for the Year 2003

    International Nuclear Information System (INIS)

    2004-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. In line with the suggestions made by the Board of Governors in March 2002, the first part is more analytical and less descriptive. This short analytical overview is supported by a second part, which describes significant safety related events and issues worldwide during 2003. A Draft Nuclear Safety Review for the Year 2003 was submitted to the March 2004 session of the Board of Governors in document GOV/2004/3. The final version of the Nuclear Safety Review for the Year 2003 was prepared in the light of the discussion by the Board.

  19. Safety Review Committee - Annual Report 1991-1992

    International Nuclear Information System (INIS)

    1993-01-01

    During the year under review. The Safety Review Committee (SRC) assessed the safety of ANSTO's operations. This was done by site visits, examination of documentation and briefing by ANSTO officers responsible for particular operations, and includes HIFAR and Moata reactors, radioisotope production, packing and dispatch, radioactive waste management practices, occupational health and safety activities and ANSTO's arrangements for public health and safety beyond the site. This report describes the activities and findings of the SRC during the year ending 30 June 1992. 8 figs., ills

  20. Guidelines for the Review of Research Reactor Safety: Revised Edition. Reference Document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    2013-01-01

    The Integrated Safety Assessment of Research Reactors (INSARR) is an IAEA safety review service available to Member States with the objective of supporting them in ensuring and enhancing the safety of their research reactors. This service consists of performing a comprehensive peer review and an assessment of the safety of the respective research reactor. The reviews are based on IAEA safety standards and on the provisions of the Code of Conduct on the Safety of Research Reactors. The INSARR can benefit both the operating organizations and the regulatory bodies of the requesting Member States, and can include new research reactors under design or operating research reactors, including those which are under a Project and Supply Agreement with the IAEA. The first IAEA safety evaluation of a research reactor operated by a Member State was completed in October 1959 and involved the Swiss 20 MW DIORIT research reactor. Since then, and in accordance with its programme on research reactor safety, the IAEA has conducted safety review missions in its Member States to enhance the safety of their research reactor facilities through the application of the Code of Conduct on the Safety of Research Reactors and the relevant IAEA safety standards. About 320 missions in 51 Member States were undertaken between 1972 and 2012. The INSARR missions and other limited scope safety review missions are conducted following the guidelines presented in this publication, which is a revision of Guidelines for the Review of Research Reactor Safety (IAEA Services Series No. 1), published in December 1997. This publication details those IAEA safety standards and guidance publications relevant to the safety of research reactors that have been revised or published since 1997. The purpose of this publication is to give guidance on the preparation, implementation, reporting and follow-up of safety review missions. It is also intended to be of assistance to operators and regulators in conducting

  1. Safety review and approval process for the TFTR

    International Nuclear Information System (INIS)

    Levine, J.D.; Howe, H.J.; Howe, K.E.

    1983-01-01

    The design, construction, and operation of the Tokamak Fusion Test Reactor (TFTR) has undergone an extensive safety and enviromental analysis involving Princeton Plasma Physics Laboratory (PPPL), the U.S. Department of Energy (DOE), the Ebasco/Grumman Industrial Subcontractor Team, and other organizations. This analysis, which is continuing during the TFTR operational phase, has been facilitated by the preparation, review and approval of several documents, including an Environmental Statement (Draft and Final), a Preliminary Safety Analysis Report (PSAR), a Final Safety Analysis Report (FSAR), Operations Safety Requirements (OSRs) and Safety Requirements (SRs), and various Operating and Maintenance Manuals. Through TFTR Safety Group participation in formal system design evaluations, change control boards, and reviews of project procurement and installation documentation, the TFTR Management Configuration Control System assures that all aspects of the project, including proposed design, installation and operational changes, receive prompt and thorough safety analyses. These efforts will continue as the TFTR Program moves into the neutral beam and D-T operational phases. The safety review and approval experience that has been acquired on the TFTR Project should serve as a foundation for similar efforts on future fusion devices

  2. Review of IAEA documentation on Nuclear and radiological emergency

    International Nuclear Information System (INIS)

    Mukhono, P. M.

    2014-10-01

    The project focuses on the review of IAEA documentation on nuclear or radiological emergencies with main focus on methodology for developing and arrangement for nuclear and radiological emergencies. The main objective of this work is to identify limitations in IAEA documentation on emergency preparedness and response (EPR) and provide recommendation on the main actions needed to fill the gaps identified thus aiding in improvement of emergency preparedness and response to nuclear and radiological accidents. The review of IAEA documentation on nuclear and radiological emergency has been carried out by evaluating various emergency response elements. Several elements for EPR were highlighted covering the safety fundamentals, general safety requirements and EPR methods for development of an effective emergence response capability for nuclear or radiological emergencies. From these issues, the limitations of IAEA documentation on EPR were drawn and recommendations suggested as a means of improving EPR methods. Among them was the need for IAEA consider establishment of follow up and inspection programmes to facilitate implementation of EPR requirements in most developing countries, establishment of programmes that provide platforms for the countries to be motivated to update their system in line with the current status of emergency preparedness, review of the international information exchange aspects of nuclear emergencies in order to improve capabilities to communicate reliable data, information and decisions quickly and effectively among national authorities and their emergency and emergency response centres. (au)

  3. Safety reviews of next-generation light-water reactors

    International Nuclear Information System (INIS)

    Kudrick, J.A.; Wilson, J.N.

    1997-01-01

    The Nuclear Regulatory Commission (NRC) is reviewing three applications for design certification under its new licensing process. The U.S. Advanced Boiling Water Reactor (ABWR) and System 80+ designs have received final design approvals. The AP600 design review is continuing. The goals of design certification are to achieve early resolution of safety issues and to provide a more stable and predictable licensing process. NRC also reviewed the Utility Requirements Document (URD) of the Electric Power Research Institute (EPRI) and determined that its guidance does not conflict with NRC requirements. This review led to the identification and resolution of many generic safety issues. The NRC determined that next-generation reactor designs should achieve a higher level of safety for selected technical and severe accident issues. Accordingly, NRC developed new review standards for these designs based on (1) operating experience, including the accident at Three Mile Island, Unit 2; (2) the results of probabilistic risk assessments of current and next-generation reactor designs; (3) early efforts on severe accident rulemaking; and (4) research conducted to address previously identified generic safety issues. The additional standards were used during the individual design reviews and the resolutions are documented in the design certification rules. 12 refs

  4. An approach for Periodic Safety Review (PSR) of units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Kichev, Emil

    2014-01-01

    Periodic Safety Reviews (PSR) is complementary to the routine and special safety reviews and does not replaced them. It determines the level of compliance with current safety requirements and covers all safety aspects of NPP operation and all equipment (SSCs) on site. Three levels of importance are defined for the documents in PSR (towards higher conservatism): Bulgarian documents; IAEA documents; Documents of manufactures and suppliers of the equipment (SSCs). The scope and activities consists of four stages and includes 14 safety factors (SF). Cooperation with external companies and organizations in areas with proved experience is used.

  5. NPP Krsko periodic safety review. Safety assessment and analyses

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Thaulez, F.

    2002-01-01

    Definition of a PSR (Periodic Safety Review) project is a comprehensive safety review of a plant after ten years of operation. The objective is a verification by means of a comprehensive review using current methods that the plant remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. The overall goals of the NEK PSR Program are defined in compliance with the basic role of a PSR and the current practice typical for most of the countries in EU. This practice is described in the related guides and good practice documents issued by international organizations. The overall goals of the NEK PSR are formulated as follows: to demonstrate that the plant is as safe as originally intended; to evaluate the actual plant status with respect to aging and wear-out identifying any structures, systems or components that could limit the life of the plant in the foreseeable future, and to identify appropriate corrective actions, where needed; to compare current level of safety in the light of modern standards and knowledge, and to identify where improvements would be beneficial for minimizing deviations at justifiable costs. The Krsko PSR will address the following safety factors: Operational Experience, Safety Assessment, EQ and Aging Management, Safety Culture, Emergency Planning, Environmental Impact and Radioactive Waste.(author)

  6. Environment, Health, and Safety - Construction Subcontractors Documents |

    Science.gov (United States)

    NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and with these requirements before submitting proposals and/or environment, health and safety plans for the

  7. PUREX Deactivation Health and Safety documentation

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, E.N. III

    1995-01-01

    The purpose of the PUREX Deactivation Project is to establish a passively safe and environmentally secure configuration of PUREX at the Hanford Site, and to preserve that configuration for a 10-year horizon. The 10-year horizon is used to predict future maintenance requirements and represents they typical time duration expended to define, authorize, and initiate the follow-on Decontamination and Decommissioning (D&D) activities. This document was prepared to increase attention to worker safety issues during the deactivation project and, as such, identifies the documentation and programs associated with PUREX Deactivation Health and Safety.

  8. SNF fuel retrieval sub project safety analysis document

    International Nuclear Information System (INIS)

    BERGMANN, D.W.

    1999-01-01

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed

  9. SNF fuel retrieval sub project safety analysis document

    Energy Technology Data Exchange (ETDEWEB)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  10. PUREX Deactivation Health and Safety documentation

    International Nuclear Information System (INIS)

    Dodd, E.N. III.

    1995-01-01

    The purpose of the PUREX Deactivation Project is to establish a passively safe and environmentally secure configuration of PUREX at the Hanford Site, and to preserve that configuration for a 10-year horizon. The 10-year horizon is used to predict future maintenance requirements and represents they typical time duration expended to define, authorize, and initiate the follow-on Decontamination and Decommissioning (D ampersand D) activities. This document was prepared to increase attention to worker safety issues during the deactivation project and, as such, identifies the documentation and programs associated with PUREX Deactivation Health and Safety

  11. Upgraded safety analysis document including operations policies, operational safety limits and policy changes. Revision 2

    International Nuclear Information System (INIS)

    Batchelor, K.

    1996-03-01

    The National Synchrotron Light Source Safety Analysis Reports (1), (2), (3), BNL reports number-sign 51584, number-sign 52205 and number-sign 52205 (addendum) describe the basic Environmental Safety and Health issues associated with the department's operations. They include the operating envelope for the Storage Rings and also the rest of the facility. These documents contain the operational limits as perceived prior or during construction of the facility, much of which still are appropriate for current operations. However, as the machine has matured, the experimental program has grown in size, requiring more supervision in that area. Also, machine studies have either verified or modified knowledge of beam loss modes and/or radiation loss patterns around the facility. This document is written to allow for these changes in procedure or standards resulting from their current mode of operation and shall be used in conjunction with the above reports. These changes have been reviewed by NSLS and BNL ES and H committee and approved by BNL management

  12. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  13. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    International Nuclear Information System (INIS)

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs

  14. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  15. Environmental restoration and decontamination and decommissioning safety documentation

    International Nuclear Information System (INIS)

    Hansen, J.L.; Frauenholz, L.H.; Kerr, N.R.

    1993-01-01

    This document presents recommendations of a working group designated by the Environmental Restoration and Remediation (ER) and Decontamination and Decommissioning (D ampersand D) subcommittees of the Westinghouse M ampersand O (Management and Operation) Nuclear Facility Safety Committee. A commonalty of approach to safety documentation specific to ER and D ampersand D activities was developed and is summarized below. Allowance for interpretative tolerance and documentation flexibility appropriate to the activity, graded for hazard category, duration, and complexity, was a primary consideration in development of this guidance

  16. Nuclear safety review for the year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6.

  17. Nuclear safety review for the year 2002

    International Nuclear Information System (INIS)

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6

  18. Measures to strengthen international co-operation in nuclear, radiation and transport safety and waste management. Nuclear safety review for the year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    The Nuclear Safety Review for the Year 2003 presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety during 2003. As in 2002 the overview is supported by more detailed Notes by the Secretariat: Safety Related Events and Issues Worldwide during 2003 (document 2004/Note 6), The Agency's Safety Standards: Activities during 2003 (document 2004/Note 7) and Providing for the Application of the Safety Standards (document 2004/Note 8). In January 2003, the Agency implemented an organization change and developed an integrated approach to reflect a broader assignment of nuclear safety and nuclear security and to better exploit synergy between them. The Office of Physical Protection and Material Security renamed to Office of Nuclear Security was transferred from the Department of Safeguards to the Department of Nuclear Safety, which became the Department of Nuclear Safety and Security to reflect the change. This Review provides information primarily on nuclear safety, and nuclear security will be addressed in a separate report

  19. Occupational Safety Review of High Technology Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee Cadwallader

    2005-01-31

    This report contains reviews of operating experiences, selected accident events, and industrial safety performance indicators that document the performance of the major US DOE magnetic fusion experiments and particle accelerators. These data are useful to form a basis for the occupational safety level at matured research facilities with known sets of safety rules and regulations. Some of the issues discussed are radiation safety, electromagnetic energy exposure events, and some of the more widespread issues of working at height, equipment fires, confined space work, electrical work, and other industrial hazards. Nuclear power plant industrial safety data are also included for comparison.

  20. Periodic safety reviews of nuclear power plants

    International Nuclear Information System (INIS)

    Toth, Csilla

    2009-01-01

    Operational nuclear power plants (NPPs) are generally subject to routine reviews of plant operation and special safety reviews following operational events. In addition, many Member States of the International Atomic Energy Agency (IAEA) have initiated systematic safety reassessment, termed periodic safety review (PSR), to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments, site specific, organizational and human aspects. These reviews include assessments of plant design and operation against current safety standards and practices. PSRs are considered an effective way of obtaining an overall view of actual plant safety, to determine reasonable and practical modifications that should be made in order to maintain a high level of safety throughout the plant's operating lifetime. PSRs can be used as a means to identify time limiting features of the plant. The trend is to use PSR as a condition for deciding whether to continue operation of the plant beyond the originally established design lifetime and for assessing the status of the plant for long term operation. To assist Member States in the implementation of PSR, the IAEA develops safety standards, technical documents and provides different services: training courses, workshops, technical meetings and safety review missions for the independent assessment of the PSR at NPPs, including the requirements for PSR, the review process and the PSR final reports. This paper describes the PSR's objectives, scopes, methods and the relationship of PSR with other plant safety related activities and recent experiences of Member States in implementation of PSRs at NPPs. (author)

  1. Design review report for modifications to RMCS safety class equipment

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1997-01-01

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable

  2. Design review report for modifications to RMCS safety class equipment

    Energy Technology Data Exchange (ETDEWEB)

    Corbett, J.E.

    1997-05-30

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable.

  3. Upgrading safety documentation for exported nuclear power plants

    International Nuclear Information System (INIS)

    Rosen, M.

    1978-01-01

    In view of the generally small regulatory staffs of importing countries, suggestions are given for upgrading the ''export edition'' of the traditionally supplied safety documentation by use of a Supplementary Information Report, written specifically for the needs of a smaller and/or less technically qualified staff, which would highlight the differences that exist between the facility to be constructed and the supposedly similar reference plant of the supplier country; by improvement of supporting safety documentation to allow for adequate understanding of significant safety parameters; and by attention to the needs of smaller countries in the critical operating regulations (Technical Specifications for Operation). (author)

  4. International review on safety requirements for the prototype fast breeder reactor “Monju” (Translated document)

    International Nuclear Information System (INIS)

    2016-02-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  5. Nuclear Safety Review for 2014

    International Nuclear Information System (INIS)

    2014-07-01

    The Nuclear Safety Review 2014 focuses on the dominant nuclear safety trends, issues and challenges in 2013. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: strengthening safety in nuclear installations; improving radiation, transport and waste safety; enhancing emergency preparedness and response (EPR); improving regulatory infrastructure and effectiveness; and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards, and activities relevant to the Agency’s safety standards. The global nuclear community has made steady and continuous progress in strengthening nuclear safety in 2013, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”) and reported in Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2013/8-GC(57)/INF/5), and the Supplementary Information to that report and Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2014/2). • Significant progress continues to be made in several key areas, such as assessments of safety vulnerabilities of nuclear power plants (NPPs), strengthening of the Agency’s peer review services, improvements in EPR capabilities, strengthening and maintaining capacity building, and protecting people and the environment from ionizing radiation. The progress that has been made in these and other areas has contributed to the enhancement of the global nuclear safety framework. • Significant progress has also been made in reviewing the Agency’s safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on vitally important areas such as design and operation of NPPs, protection of NPPs against severe accidents, and EPR. • The Agency continued to

  6. [Patient safety in home care - A review of international recommendations].

    Science.gov (United States)

    Czakert, Judith; Lehmann, Yvonne; Ewers, Michael

    2018-06-08

    In recent years there has been a growing trend towards nursing care at home in general as well as towards intensive home care being provided by specialized home care services in Germany. However, resulting challenges for patient safety have rarely been considered. Against this background we aimed to explore whether international recommendations for patient safety in home care in general and in intensive home care in particular already exist and how they can stimulate further practice development in Germany. A review of online English documents containing recommendations for patient safety in intensive home care was conducted. Available documents were analyzed and compared in terms of their form and content. Overall, a small number of relevant documents could be identified. None of these documents exclusively refer to the intensive home care sector. Despite their differences, however, the analysis of four selected documents showed similarities, e. g., regarding specific topics of patient safety (communication, involvement of patients and their relatives, risk assessment, medication management, qualification). Furthermore, strengths and weaknesses of the documents became apparent: e. g., an explicit understanding of patient safety, a literature-based introduction to safety topics or an adaptation of the recommendations to the specific features of home care were occasionally lacking. This document analysis provides interesting input to the formal and content-related development of specific recommendations and to practice development in Germany to improve patient safety in home care. Copyright © 2018. Published by Elsevier GmbH.

  7. Status of High Flux Isotope Reactor (HFIR) post-restart safety analysis and documentation upgrades

    International Nuclear Information System (INIS)

    Cook, D.H.; Radcliff, T.D.; Rothrock, R.B.; Schreiber, R.E.

    1990-01-01

    The High Flux Isotope Reactor (HFIR), an experimental reactor located at the Oak Ridge National Laboratory (ORNL) and operated for the US Department of Energy by Martin Marietta Energy Systems, was shut down in November, 1986 after the discovery of unexpected neutron embrittlement of the reactor vessel. The reactor was restarted in April, 1989, following an extensive review by DOE and ORNL of the HFIR design, safety, operation, maintenance and management, and the implementation of several upgrades to HFIR safety-related hardware, analyses, documents and procedures. This included establishing new operating conditions to provide added margin against pressure vessel failure, as well as the addition, or upgrading, of specific safety-related hardware. This paper summarizes the status of some of the follow-on (post-restart) activities which are currently in progress, and which will result in a comprehensive set of safety analyses and documentation for the HFIR, comparable with current practice in commercial nuclear power plants. 8 refs

  8. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  9. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  10. Safety review on unit testing of safety system software of nuclear power plant

    International Nuclear Information System (INIS)

    Liu Le; Zhang Qi

    2013-01-01

    Software unit testing has an important place in the testing of safety system software of nuclear power plants, and in the wider scope of the verification and validation. It is a comprehensive, systematic process, and its documentation shall meet the related requirements. When reviewing software unit testing, attention should be paid to the coverage of software safety requirements, the coverage of software internal structure, and the independence of the work. (authors)

  11. A graded approach to safety documentation at processing facilities

    International Nuclear Information System (INIS)

    Cowen, M.L.

    1992-01-01

    Westinghouse Savannah River Company (WSRC) has over 40 major Safety Analysis Reports (SARs) in preparation for non-reactor facilities. These facilities include nuclear material production facilities, waste management facilities, support laboratories and environmental remediation facilities. The SARs for these various projects encompass hazard levels from High to Low, and mission times from startup, through operation, to shutdown. All of these efforts are competing for scarce resources, and therefore some mechanism is required for balancing the documentation requirements. Three of the key variables useful for the decision making process are Depth of Safety Analysis, Urgency of Safety Analysis, and Resource Availability. This report discusses safety documentation at processing facilities

  12. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    International Nuclear Information System (INIS)

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals

  13. Documents pertaining to safety control of nuclear facilities

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls the safety of nuclear facilities in Finland. This control encompasses on one hand the evaluation of plant safety on the basis of plans and analyses pertaining to the plant and on the other hand the inspection of plant structures, systems and components as well as of operational activity. STUK also monitors plants operational experience feedback and technical developments in the field, as well as the development of safety research and takes the necessary measures on their basis. Guide YVL 1.1 describes how STUK controls the design, construction and operation of nuclear power plants. The documents to be submitted to STUK are described in the nuclear energy legislation and YVL guides. This guide presents the mode of delivery, quality, contents and number of documents to be submitted to STUK

  14. DSRS guidelines. Reference document for the IAEA Design Safety Review Services

    International Nuclear Information System (INIS)

    1999-01-01

    The publication covers the general topic of design safety review of a nuclear power plant. It is intended to make Member States aware of the possibility of a service through which they can have a better appreciation of the overall design of a facility or of a plant already in operation. It includes a generic and procedural part followed by a technical part corresponding to different systems of a nuclear power plant. It is intended to be used mainly in preparation and execution of a design review service by the IAEA and to provide information to potential recipients of the service regarding the effort involved and the topics that can be covered. it is expected to be useful if Member States decide to conduct such reviews themselves either through regulatory authorities or as part of self assessment activities by plant management

  15. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  16. Tank waste remediation system nuclear criticality safety program management review

    International Nuclear Information System (INIS)

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  17. Intranet-based safety documentation in management of major hazards and occupational health and safety.

    Science.gov (United States)

    Leino, Antti

    2002-01-01

    In the European Union, Council Directive 96/82/EC requires operators producing, using, or handling significant amounts of dangerous substances to improve their safety management systems in order to better manage the major accident potentials deriving from human error. A new safety management system for the Viikinmäki wastewater treatment plant in Helsinki, Finland, was implemented in this study. The system was designed to comply with both the new safety liabilities and the requirements of OHSAS 18001 (British Standards Institute, 1999). During the implementation phase experiences were gathered from the development processes in this small organisation. The complete documentation was placed in the intranet of the plant. Hyperlinks between documents were created to ensure convenience of use. Documentation was made accessible for all workers from every workstation.

  18. Safety Review Services, Site Review Services and IRRS

    International Nuclear Information System (INIS)

    Yllera, Javier

    2010-01-01

    The selection and the evaluation of the site for a nuclear power plant are crucial parts of establishing a nuclear power programme and can be significantly affected by costs, public acceptance and safety considerations. Siting is the process of selecting a suitable site for a facility. This is area containing the plant, defined by a boundary and under effective control of the Plant Management. For safety related issues comparison within topics is generally quite straightforward. For example, sites with relatively higher seismic hazard would be penalized in comparison with those in more stable areas. The site for the NPP is generally chosen at a relatively ‘aseismic’ part of the country. This generally means that well known seismogenic sources are more than at least 50 kms from the site. The proposed sites for nuclear installations shall be examined with respect to the frequency and the severity of natural and human induced events and phenomena that could affect the safety of the installation. The Events unconnected with the operation of a facility or activity which could have an effect on the safety of the facility or activity. The relationship between the site and the design for the nuclear installation shall be examined to ensure that the radiological risk to the public and the environment arising from releases defined by the source terms is acceptably low. The Nuclear Regulatory Authority should issue a document that sets out the technical safety and security criteria against which the Site Permit Application for a new NPP will be reviewed. The objective of the Site Safety Review Services (SSRS) is provided upon request from a Member State. An independent review and assessment of the site and nuclear installation safety in relation to external natural and man induced hazards. This is to make recommendations on additional analysis or plant modifications to be carried out in order to comply with the IAEA Safety Standards and to enhance safety

  19. Safety review for human factors engineering and control rooms of nuclear power plants

    International Nuclear Information System (INIS)

    Yang Mengzhuo

    1998-01-01

    Safety review for human factors engineering and control rooms of nuclear power plants (NPP) is in a forward position of science and technology, which began at American TMI severe accident and had been implemented in China. The importance and the significance of the safety review are expounded, the requirements of its scope and profundity are explained in detail. In addition, the situation of the technical document system for nuclear safety regulation on human factors engineering and control rooms of NPP in China is introduced briefly, on which the safety review is based

  20. Evolution of Safety Basis Documentation for the Fernald Site

    International Nuclear Information System (INIS)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure

  1. Synthesis of the IRSN report on its analysis of the safety guidance package (DOrS) of the ASTRID reactor project. Safety guidance document for the ASTRID prototype: Referral to the GPR. Opinion related to the safety guidance document of the ASTRID reactor project. ASTRID prototype: Safety guidance document for the ASTRID prototype

    International Nuclear Information System (INIS)

    Lachaume, Jean-Luc; Niel, Jean-Christophe

    2013-01-01

    A first document indicates the improvement guidelines for the ASTRID project based on the French experience in the field of sodium-cooled fast neutron reactors, addresses the safety objectives as they are presented for the ASTRID project, discusses how the project includes a regulation and design referential, and how it addresses various aspects of the design approach (ranking and analysis of operation situations, defence in depth, use of probabilistic studies, safety classification and qualification to accidental situations, taking internal and external aggressions into account and taking severe accidents into account at the design level). It comments the guidelines related to the first two barriers, to main safety functions (control of reactivity and of reactor cooling, containment of radioactive and toxic materials), to dismantling, to R and D for safety support. A second document is a letter sent by the ASN to the GPR (permanent group of experts in charge of nuclear reactors) about the safety guidance document for the ASTRID prototype. The third document is the answer and contains comments and recommendations by this group about the content of this document, and therefore addresses the same topics as the first document. The last document defines the framework of the approach to this document

  2. Reactor safety review of permanent changes

    International Nuclear Information System (INIS)

    Lam, K.F.

    1997-01-01

    Operational compliance engineers review all changes as part of a change control process. Each change, permanent or temporary, is required to undergo an intricate review process to ensure that the benefits associated with the change outweigh the risk. For permanent changes, it is necessary to ensure that the proposed design meets the nuclear safety requirements, conforms to the licensing requirements and complies with regulatory requirements. In addition, during installation of the permanent change and prior to in-service, a configuration management process is in place to align the change with operating and maintenance documents. (author)

  3. Packaging review guide for reviewing safety analysis reports for packagings: Revision 1

    International Nuclear Information System (INIS)

    Fisher, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1988-10-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. The principal purpose of this document is to assure the quality and uniformity of PCS reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The Packaging Review Guide (PRG) also sets forth solutions and approaches determined to be acceptable in the past in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented. It is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 77 refs., 16 figs., 15 tabs

  4. Preparation of safety and regulatory document for BARC Facilities

    International Nuclear Information System (INIS)

    Prasad, S.S.; Jayarajan, K.

    2017-01-01

    In India, the necessary codes and safety guidelines for achieving the safety objectives are provided by the Atomic Energy Regulatory Board (AERB), which are in conformity with the principles of radiation protection as formulated by the International Council of Radiation Protection (ICRP) and International Atomic Energy Agency (IAEA). The same is followed by BARC Safety Council (BSC), which is the regulatory body for the BARC facilities. In addition to all types of fuel cycle facilities, BSC regulates safety of many types of conventional facilities. Many such types of facilities and projects are not under the regulatory purview of AERB. Therefore, the Council has also initiated a programme for development and publication of safety documents for installations in BARC in the fields/ topics yet not addressed by IAEA or AERB. This makes the task pioneering, as some of the areas taken up for defining the regulatory requirements are new, where standard regulatory documents are not available

  5. IAEA activities in preparation of reglamentary documents on nuclear power plant safety

    International Nuclear Information System (INIS)

    Konstantinov, L.V.

    1976-01-01

    The activities of the IAEA in the field of working out practical rules and recommendations ensuring the nuclear power plant safety are discussed. The practical rules will establish the aims and the minimum of requirements, that must be carried out to ensure the necessary safety of systems, components and equipment of the nuclear power plant throughout the whole period of its exploitation. Described is the procedure of the document preparation, consisting of the collection of documents, edited in different countries, the integration of documents by the IAEA Secretariat, the consideratiom of documents by the Group of senior advisers, the preparation of the draft document, the additional wort at the document in accordaqce with the remarks of the IAEA member-countries, the edition and dissemination of documents. The necessity for the active participation of the CMEA member-countries in the development and discussion of documents concerning the nuclear power plant safety is stated [ru

  6. Using Addenda in Documented Safety Analysis Reports

    International Nuclear Information System (INIS)

    Swanson, D.S.; Thieme, M.A.

    2003-01-01

    This paper discusses the use of addenda to the Radioactive Waste Management Complex (RWMC) Documented Safety Analysis (DSA) located at the Idaho National Engineering and Environmental Laboratory (INEEL). Addenda were prepared for several systems and processes at the facility that lacked adequate descriptive information and hazard analysis in the DSA. They were also prepared for several new activities involving unreviewed safety questions (USQs). Ten addenda to the RWMC DSA have been prepared since the last annual update

  7. Planning Document for an NBSR Conversion Safety Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond D. J.; Baek J.; Hanson, A.L.; Cheng, L-Y.; Brown, N.; Cuadra, A.

    2013-09-25

    The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the National Bureau of Standards Reactor (NBSR). The NBSR is a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a planning document for the conversion Safety Analysis Report (SAR) that would be submitted to, and approved by, the Nuclear Regulatory Commission (NRC) before the reactor could be converted.This report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis herein is on the SAR chapters that require significant changes as a result of conversion, primarily Chapter 4, Reactor Description, and Chapter 13, Safety Analysis. The document provides information on the proposed design for the LEU fuel elements and identifies what information is still missing. This document is intended to assist ongoing fuel development efforts, and to provide a platform for the development of the final conversion SAR. This report contributes directly to the reactor conversion pillar of the GTRI program, but also acts as a boundary condition for the fuel development and fuel fabrication pillars.

  8. Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  9. Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-10-01

    This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  10. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  11. A literature review of safety culture.

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Kerstan Suzanne; Stevens-Adams, Susan Marie; Wenner, Caren A.

    2013-03-01

    Workplace safety has been historically neglected by organizations in order to enhance profitability. Over the past 30 years, safety concerns and attention to safety have increased due to a series of disastrous events occurring across many different industries (e.g., Chernobyl, Upper Big-Branch Mine, Davis-Besse etc.). Many organizations have focused on promoting a healthy safety culture as a way to understand past incidents, and to prevent future disasters. There is an extensive academic literature devoted to safety culture, and the Department of Energy has also published a significant number of documents related to safety culture. The purpose of the current endeavor was to conduct a review of the safety culture literature in order to understand definitions, methodologies, models, and successful interventions for improving safety culture. After reviewing the literature, we observed four emerging themes. First, it was apparent that although safety culture is a valuable construct, it has some inherent weaknesses. For example, there is no common definition of safety culture and no standard way for assessing the construct. Second, it is apparent that researchers know how to measure particular components of safety culture, with specific focus on individual and organizational factors. Such existing methodologies can be leveraged for future assessments. Third, based on the published literature, the relationship between safety culture and performance is tenuous at best. There are few empirical studies that examine the relationship between safety culture and safety performance metrics. Further, most of these studies do not include a description of the implementation of interventions to improve safety culture, or do not measure the effect of these interventions on safety culture or performance. Fourth, safety culture is best viewed as a dynamic, multi-faceted overall system composed of individual, engineered and organizational models. By addressing all three components of

  12. Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Higgins, J.; Fleger, Stephen

    2011-01-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.

  13. SRTC criticality safety technical review: Nuclear Criticality Safety Evaluation 93-04 enriched uranium receipt

    International Nuclear Information System (INIS)

    Rathbun, R.

    1993-01-01

    Review of NMP-NCS-930087, open-quotes Nuclear Criticality Safety Evaluation 93-04 Enriched Uranium Receipt (U), July 30, 1993, close quotes was requested of SRTC (Savannah River Technology Center) Applied Physics Group. The NCSE is a criticality assessment to determine the mass limit for Engineered Low Level Trench (ELLT) waste uranium burial. The intent is to bury uranium in pits that would be separated by a specified amount of undisturbed soil. The scope of the technical review, documented in this report, consisted of (1) an independent check of the methods and models employed, (2) independent HRXN/KENO-V.a calculations of alternate configurations, (3) application of ANSI/ANS 8.1, and (4) verification of WSRC Nuclear Criticality Safety Manual procedures. The NCSE under review concludes that a 500 gram limit per burial position is acceptable to ensure the burial site remains in a critically safe configuration for all normal and single credible abnormal conditions. This reviewer agrees with that conclusion

  14. Hanford Site Wide Transportation Safety Document [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    MCCALL, D L

    2002-06-01

    This safety evaluation report (SER) documents the basis for the US Department of Energy (DOE), Richland Operations Office (RL) to approve the Hanford Sitewide Transportation Safety Document (TSD) for onsite Transportation and Packaging (T&P) at Hanford. Hanford contractors, on behalf of DOE-RL, prepared and submitted the Hanford Sitewide Transportation Safety Document, DOE/RL-2001-0036, Revision 0, (DOE/RL 2001), dated October 4, 2001, which is referred to throughout this report as the TSD. In the context of the TSD, Hanford onsite shipments are the activities of moving hazardous materials, substances, and wastes between DOE facilities and over roadways where public access is controlled or restricted and includes intra-area and inter-area movements. The TSD sets forth requirements and standards for onsite shipment of radioactive and hazardous materials and wastes within the confines of the Hanford Site on roadways where public access is restricted by signs, barricades, fences, or other means including road closures and moving convoys controlled by Hanford Site security forces.

  15. Electronic Medical Record Documentation of Driving Safety for Veterans with Diagnosed Dementia.

    Science.gov (United States)

    Vair, Christina L; King, Paul R; Gass, Julie; Eaker, April; Kusche, Anna; Wray, Laura O

    2018-01-01

    Many older adults continue to drive following dementia diagnosis, with medical providers increasingly likely to be involved in addressing such safety concerns. This study examined electronic medical record (EMR) documentation of driving safety for veterans with dementia (N = 118) seen in Veterans Affairs primary care and interdisciplinary geriatrics clinics in one geographic region over a 10-year period. Qualitative directed content analysis of retrospective EMR data. Assessment of known risk factors or subjective concerns for unsafe driving were documented in fewer than half of observed cases; specific recommendations for driving safety were evident for a minority of patients, with formal driving evaluation the most frequently documented recommendation by providers. Utilizing data from actual clinical encounters provides a unique snapshot of how driving risk and safety concerns are addressed for veterans with dementia. This information provides a meaningful frame of reference for understanding potential strengths and possible gaps in how this important topic area is being addressed in the course of clinical care. The EMR is an important forum for interprofessional communication, with documentation of driving risk and safety concerns an essential element for continuity of care and ensuring consistency of information delivered to patients and caregivers.

  16. Safety evaluation report of the Waste Isolation Pilot Plant safety analysis report: Contact-handled transuranic waste disposal operations

    International Nuclear Information System (INIS)

    1997-02-01

    DOE 5480.23, Nuclear Safety Analysis Reports, requires that the US Department of Energy conduct an independent, defensible, review in order to approve a Safety Analysis Report (SAR). That review and the SAR approval basis is documented in this formal Safety Evaluation Report (SER). This SER documents the DOE's review of the Waste Isolation Pilot Plant SAR and provides the Carlsbad Area Office Manager, the WIPP SAR approval authority, with the basis for approving the safety document. It concludes that the safety basis documented in the WIPP SAR is comprehensive, correct, and commensurate with hazards associated with planned waste disposal operations

  17. Preliminary standard review guide for Environmental Restoration/Decontamination and Decommissioning safety analyses

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1993-06-01

    The review guide is based on the shared experiences, approaches, and philosophies of the Environmental Restoration/Decontamination and Decommissioning (ER/D ampersand D) subgroup members. It is presented in the form of a review guide to maximize the benefit to both the safety analyses practitioner and reviewer. The guide focuses on those challenges that tend to be unique to ER/D ampersand D cleanup activities. Some of these experiences, approaches, and philosophies may find application or be beneficial to a broader spectrum of activities such as terminal cleanout or even new operations. Challenges unique to ER/D ampersand D activities include (1) consent agreements requiring activity startup on designated dates; (2) the increased uncertainty of specific hazards; and (3) the highly variable activities covered under the broad category of ER/D ampersand D. These unique challenges are in addition to the challenges encountered in all activities; e.g., new and changing requirements and multiple interpretations. The experiences in approaches, methods, and solutions to the challenges are documented from the practitioner and reviewer's perspective, thereby providing the viewpoints on why a direction was taken and the concerns expressed. Site cleanup consent agreements with predetermined dates for restoration activity startup add the dimension of imposed punitive actions for failure to meet the date. Approval of the safety analysis is a prerequisite to startup. Actions that increase expediency are (1) assuring activity safety; (2) documenting that assurance; and (3) acquiring the necessary approvals. These actions increase the timeliness of startup and decrease the potential for punitive action. Improvement in expediency has been achieved by using safety analysis techniques to provide input to the line management decision process rather than as a review of line management decisions. Expediency is also improved by sharing the safety input and resultant decisions with

  18. Development of Safety Review Guide for the Periodic Safety Review of Reactor Vessel Internals

    International Nuclear Information System (INIS)

    Park, Jeongsoon; Ko, Hanok; Kim, Seonjae; Jhung, Myungjo

    2013-01-01

    Aging management of the reactor vessel internals (RVIs) is one of the important issues for long-term operation of nuclear power plants (NPPs). Safety review on the assessment and management of the RVI aging is conducted through the process of a periodic safety review (PSR). The regulatory body should check that reactor facilities sustain safety functions in light of degradation due to aging and that the operator of a nuclear power reactor establishes and implements management program to deal with degradation due to aging in order to guarantee the safety functions and the safety margin as a result of PSR. KINS(Korea Institute of Nuclear Safety) has utilized safety review guides (SRG) which provide guidance to KINS staffs in performing safety reviews in order to assure the quality and uniformity of staff safety reviews. The KINS SRGs for the continued operation of pressurized water reactors (PWRs) published in 2006 contain areas of review regarding aging management of RVIs in chapter 2 (III.2.15, Appendix 2.0.1). However unlike the SRGs for the continued operation, KINS has not officially published the SRGs for the PSR of PWRs, but published them as a form of the research report. In addition to that, the report provides almost same review procedures for aging assessment and management of RVIs with the ones provided in the SRGs for the continued operation, it cannot provide review guidance specific to PSRs. Therefore, a PSR safety review guide should be developed for RVIs in PWRs. In this study, a draft PSR safety review guide for reactor vessel internals in PWRs is developed and provided. In this paper, a draft PSR safety review guide for reactor vessel internals (PSR SRG-RVIs) in PWRs is introduced and main contents of the draft are provided. However, since the PSR safety review guides for areas other than RVIs in the pressurized water reactors (PWRs) are expected to be developed in the near future, the draft PSR SRG-RVIs should be revisited to be compatible with

  19. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapter 1, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  20. Nuclear Safety Review for 2015

    International Nuclear Information System (INIS)

    2015-06-01

    Safety in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant; and IAEA Report on Radiation Protection After the Fukushima Daiichi Accident: Promoting Confidence and Understanding3. The Agency’s report on severe accident management in the light of the accident at the Fukushima Daiichi NPP is currently in the publication process. Furthermore, during this reporting period, significant progress has been made in preparing the Agency’s report on the Fukushima Daiichi accident. The report will be formally presented to the 59th session of the General Conference in 2015. The Sixth Review Meeting of the Contracting Parties to the Convention on Nuclear Safety (CNS) concluded in April 2014. Of the 76 Contracting Parties, 33 Contracting Parties have NPPs, while 43 Contracting Parties have no NPPs. Sixty-nine of the 76 Contracting Parties participated in the Review Meeting and 65 Contracting Parties provided National Reports which were presented and discussed at the six Country Group sessions. Additionally, to reinforce the effectiveness of the Convention peer review process, the Contracting Parties approved modifications to the CNS guideline documents recommended by the Working Group on Effectiveness and Transparency, set up after the Second Extraordinary Meeting of the Contracting Parties to the Convention in August 2012. These modifications aim, for example, to ensure greater consistency in reporting and to enhance international cooperation. The next Review Meeting will be convened in April 2017. At the CNS review meeting, the Contracting Parties agreed to convene a Diplomatic Conference within one year to examine a proposal from Switzerland to amend Article 18 of the Convention addressing the design and construction of both existing and new NPPs. • The Agency organized the third International Conference on Challenges Faced by Technical and Scientific Support Organizations (TSOs) in Enhancing Nuclear Safety and Security: Strengthening Cooperation and

  1. Standard Review Plan for the review of safety analysis reports for nuclear power plants: LWR edition

    International Nuclear Information System (INIS)

    1987-06-01

    The Standard Review Plan (SRP) is prepared for the guidance of staff reviewers in the Office of Nuclear Reactor Regulation in performing safety reviews of applications to construct or operate nuclear power plants. The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. It is also a purpose of the SRP to make information about regulatory matters widely available and to improve communication and understanding of the staff review process by interested members of the public and the nuclear power industry. The safety review is primarily based on the information provided by an applicant in a Safety Analysis Report (SAR). The SAR must be sufficiently detailed to permit the staff to determine whether the plant can be built and operated without undue risk to the health and safety of the public. The SAR is the principal document in which the applicant provides the information needed to understand the basis upon which this conclusion has been reached. The individual SRP sections address, in detail, who performs the review, the matters that are reviewed, the basis for review, how the review is accomplished, and the conclusions that are sought. The safety review is performed by 25 primary branches. One of the objectives of the SRP is to assign the review responsibilities to the various branches and to define the sometimes complex interfaces between them. Each SRP section identifies the branch that has the primary review responsibility for that section. In some review areas the primary branch may require support, and the branches that are assigned these secondary review responsibilities are also identified for each SRP section

  2. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  3. Peer review of the Barselina Level 1 probabilistic safety assessment of the Ignalina Nuclear Power Plant, Unit 2

    International Nuclear Information System (INIS)

    McKay, S.L.; Coles, G.A.

    1995-01-01

    The Barselina Project is a Swedish-funded, cooperative effort among Lithuania, Russia and Sweden to transfer Western probabilistic safety assessment (PSA) methodology to the designers/operators of Ignalina Nuclear Power Plant (INPP). The overall goal is to use the PSA as a tool for assessing plant operational safety. The INPP is a two-unit, Former Soviet Union-designed nuclear facility located in Lithuania. The results of this PSA will ultimately be used to identify plant-specific improvements in system design and the conduct of facility operations, allowing improved operational safety. Pacific Northwest Laboratory (PNL) was asked to perform an independent expert peer review of the Barselina PSA. This report documents the findings of this review. This review, financed with nuclear safety assistance funds through the US Agency for International Development (USAID) and the US Department of Energy (DOE), satisfies Task II of the PNL peer review of the Barselina project. The objective is to provide an independent, in-proce ss examination of the Barselina Level 1 PSA of Ignalina Nuclear Power Plant, Unit 2. The review consisted of an investigation of the project documentation, interviews, and extensive discussions with the PSA staff during critical stages of the project. PNL assessed the readability, completeness, consistency, validity, and applicability of the PSA. The major aspects explored were its purpose, major assumptions, analysis/modeling, results, and interpretation. It was not within the scope of this review to perform plant walkdowns or to review material other than the PSA documentation

  4. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapters 2--13, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  5. Medication safety programs in primary care: a scoping review.

    Science.gov (United States)

    Khalil, Hanan; Shahid, Monica; Roughead, Libby

    2017-10-01

    measures. The objectives, inclusion criteria and methods for this scoping review were specified in advance and documented in a protocol that was previously published. This scoping review included nine studies published over an eight-year period that investigated or described the effects of medication safety programs in primary care settings. We classified each of the nine included studies into three main sections according to whether they included an organizational, professional or patient component. The organizational component is aimed at changing the structure of the organization to implement the intervention, the professional component is aimed at the healthcare professionals involved in implementing the interventions, and the patient component is aimed at counseling and education of the patient. All of the included studies had different types of medication safety programs. The programs ranged from complex interventions including pharmacists and teams of healthcare professionals to educational packages for patients and computerized system interventions. The outcome measures described in the included studies were medication error incidence, adverse events and number of drug-related problems. Multi-faceted medication safety programs are likely to vary in characteristics. They include educational training, quality improvement tools, informatics, patient education and feedback provision. The most likely outcome measure for these programs is the incidence of medication errors and reported adverse events or drug-related problems.

  6. Design Review Report for formal review of safety class features of exhauster system for rotary mode core sampling

    International Nuclear Information System (INIS)

    JANICEK, G.P.

    2000-01-01

    Report documenting Formal Design Review conducted on portable exhausters used to support rotary mode core sampling of Hanford underground radioactive waste tanks with focus on Safety Class design features and control requirements for flammable gas environment operation and air discharge permitting compliance

  7. Design Review Report for formal review of safety class features of exhauster system for rotary mode core sampling

    Energy Technology Data Exchange (ETDEWEB)

    JANICEK, G.P.

    2000-06-08

    Report documenting Formal Design Review conducted on portable exhausters used to support rotary mode core sampling of Hanford underground radioactive waste tanks with focus on Safety Class design features and control requirements for flammable gas environment operation and air discharge permitting compliance.

  8. Nuclear Safety Review 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis.

  9. Nuclear Safety Review 2013

    International Nuclear Information System (INIS)

    2013-07-01

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis

  10. Assessment by peer review of the effectiveness of a regulatory programme for radiation safety. Interim report for comment

    International Nuclear Information System (INIS)

    2002-06-01

    This document covers assessment of those aspects of a radiation protection and safety infrastructure that are implemented by the Regulatory Authority for radiation sources and practices using such sources and necessarily includes those ancillary technical services, such as dosimetry services, which directly affect the ability of the Regulatory Authority to discharge its responsibilities. The focus of the guidance in this TECDOC is on assessment of a regulatory programme intended to implement the BSS. The BSS address transportation and waste safety mainly by reference to other IAEA documents. When conducting an assessment, the Review Team members should be aware of the latest IAEA documents (or similar national documents) concerning transportation and waste safety and, if appropriate, nuclear safety, and take them into account to the extent applicable when assessing the effectiveness of the regulatory programme governing radiation protection and safety of radiation source practices in a particular State

  11. Assessment by peer review of the effectiveness of a regulatory programme for radiation safety. Interim report for comment

    International Nuclear Information System (INIS)

    2001-05-01

    This document covers assessment of those aspects of a radiation protection and safety infrastructure that are implemented by the Regulatory Authority for radiation sources and practices using such sources and necessarily includes those ancillary technical services, such as dosimetry services, which directly affect the ability of the Regulatory Authority to discharge its responsibilities. The focus of the guidance in this TECDOC is on assessment of a regulatory programme intended to implement the BSS. The BSS address transportation and waste safety mainly by reference to other IAEA documents. When conducting an assessment, the Review Team members should be aware of the latest IAEA documents (or similar national documents) concerning transportation and waste safety and, if appropriate, nuclear safety, and take them into account to the extent applicable when assessing the effectiveness of the regulatory programme governing radiation protection and safety of radiation source practices in a particular State

  12. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    International Nuclear Information System (INIS)

    Sagar, Budhi; Egan, Michael; Roehlig, Klaus-Juergen; Chapman, Neil; Wilmot, Roger

    2008-03-01

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM review team requested that consideration be given

  13. Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  14. Aging evaluation methodology of periodic safety review in Korea

    International Nuclear Information System (INIS)

    Park, Heung-Bae; Jung, Sung-Gyu; Jin, Tae-Eun; Jeong, Ill-Seok

    2002-01-01

    reference Code and Standards. At the stage of evaluation of SSCs, evaluation of SSCs is performed using Code and Standards reviewed, and based on these results safety improvement items are drawn. The contents of evaluation of SSCs are as follows: use of experience from other nuclear NPPs and of research findings: reviewing the failure experience, operating experience, and research findings; actual condition of the NPP: identifying component and functions, reviewing design and operating parameters, reviewing test, inspection and maintenance histories, reviewing aging management programs, and reviewing document management system; management of aging: analyzing aging phenomena, identifying safety margin for safe operation, and expecting future status of SSCs Finally, safety issues are suggested. Safety issues are classified into 3 groups according to their importance and emergency, such as, safety issue, improvement items and recommendations. The PSR has been performed firstly in Korea. So, many efforts are needed, such as, consolidating regulating laws, adjusting scope of evaluation, improving evaluation technology and so on

  15. Periodic safety review of the HTR-10 safety analysis

    International Nuclear Information System (INIS)

    Chen Fubing; Zheng Yanhua; Shi Lei; Li Fu

    2015-01-01

    Designed by the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University, the 10 MW High Temperature Gas-cooled Reactor-Test Module (HTR-10) is the first modular High Temperature Gas-cooled Reactor (HTGR) in China. According to the nuclear safety regulations of China, the periodic safety review (PSR) of the HTR-10 was initiated by INET after approved by the National Nuclear Safety Administration (NNSA) of China. Safety analysis of the HTR-10 is one of the key safety factors of the PSR. In this paper, the main contents in the review of safety analysis are summarized; meanwhile, the internal evaluation on the review results is presented by INET. (authors)

  16. Regulatory review of probabilistic safety assessment (PSA) level 1

    International Nuclear Information System (INIS)

    2000-02-01

    Probabilistic safety assessment (PSA) is increasingly being used as part of the decision making process to assess the level of safety of nuclear power plants. The methodologies in use are maturing and the insights gained from the PSAs are being used along with those from the deterministic analysis. Many regulatory authorities consider that the current state of the art in PSA (especially Level 1 PSA) is sufficiently well developed that it can be used centrally in the regulatory decision making process - referred to as 'risk informed regulation'. For these applications to be successful, it will be necessary for regulatory authorities to have a high degree of confidence in PSA. However, at the IAEA Technical Committee Meeting on Use of PSA in the Regulatory Process in 1994 and at the OECD Nuclear Energy Agency Committee for Nuclear Regulatory Activities (CNRA) 'Special Issues' Meeting in 1997 on Review Procedures and Criteria for Different Regulatory Applications of PSA, it was recognized that formal regulatory review guidance for PSA did not exist. The senior regulators noted that there was a need to produce some international guidance for reviewing PSAs to establish an agreed basis for assessing whether important technological and methodological issues in PSAs are treated adequately and to verify that conclusions reached are appropriate. In 1997 the IAEA and OECD Nuclear Energy Agency agreed to produce in co-operation a technical document on the regulatory review of PSA. This publication is intended to provide guidance to regulatory authorities on how to review the PSA for a nuclear power plant to gain confidence that it has been carried out to an acceptable standard so that it can be used as the basis for taking risk informed decisions within a regulatory decision making process. The document gives guidance on how to set about reviewing a PSA and on the technical issues that need to be addressed. This publication gives guidance for the review of Level 1 PSA for

  17. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M., E-mail: ottoncf@tecnatom.com.br, E-mail: emfreire46@gmail.com, E-mail: robcrepaldi@hotmail.com [Tecnatom do Brasil Engenharia e Servicos Ltda, Rio de Janeiro, RJ (Brazil); Campello, Sergio A., E-mail: sacampe@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  18. Second periodic safety review of Angra Nuclear Power Station, unit 1

    International Nuclear Information System (INIS)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M.; Campello, Sergio A.

    2015-01-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  19. Aviation and healthcare: a comparative review with implications for patient safety.

    Science.gov (United States)

    Kapur, Narinder; Parand, Anam; Soukup, Tayana; Reader, Tom; Sevdalis, Nick

    2016-01-01

    Safety in aviation has often been compared with safety in healthcare. Following a recent article in this journal, the UK government set up an Independent Patient Safety Investigation Service, to emulate a similar well-established body in aviation. On the basis of a detailed review of relevant publications that examine patient safety in the context of aviation practice, we have drawn up a table of comparative features and a conceptual framework for patient safety. Convergence and divergence of safety-related behaviours across aviation and healthcare were derived and documented. Key safety-related domains that emerged included Checklists, Training, Crew Resource Management, Sterile Cockpit, Investigation and Reporting of Incidents and Organisational Culture. We conclude that whilst healthcare has much to learn from aviation in certain key domains, the transfer of lessons from aviation to healthcare needs to be nuanced, with the specific characteristics and needs of healthcare borne in mind. On the basis of this review, it is recommended that healthcare should emulate aviation in its resourcing of staff who specialise in human factors and related psychological aspects of patient safety and staff wellbeing. Professional and post-qualification staff training could specifically include Cognitive Bias Avoidance Training, as this appears to play a key part in many errors relating to patient safety and staff wellbeing.

  20. Review of the DOE Packaging and Transportation Safety Program

    International Nuclear Information System (INIS)

    Snyder, B.J.; Cece, J.M.

    1992-12-01

    This report documents the results of a year-long self-assessment of DOE-EH transportation and packaging safety activities. The self-assessment was initiated in September 1991 and concluded in August 1992. The self-assessment identified several significant issues, some of which have been resolved by EH. Also, improvements in the EH program were made during the course of the self-assessment. The report reflects the status of the EH transportation and packaging safety activities at the conclusion of the self-assessment. This report consists of several sections which discuss background, objectives and description of the review. Another section includes summary discussion and key conclusions. Appendix A, Issues, Observations and Recommendations, lists fifteen issues, including appropriate observations and recommendations. A Corrective Action Plan, which documents EH managements resolve to implement the agreed-upon recommendations, is included. The Corrective Action Plan reflects the status of completed and planned actions as of the date of the report

  1. Prioritized schedule for review of industrial safety and occupational health programs

    International Nuclear Information System (INIS)

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC's compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ''The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.''

  2. KHNP special safety review

    International Nuclear Information System (INIS)

    Lee, Tae-Ho; Lee, Bang-Jin; Lee, Soung-Hee; Park, Goon-Cherl

    2009-01-01

    Commemorating the 30 year anniversary of commercial nuclear power plant operation in KOREA, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has conducted a Special Safety Review (SSR) of its 20 operating units to understand their safety performance and to identify any areas that need improvement. The SSR reviewed all 20 operating units for 2 weeks per site. Areas that were reviewed are Safety Margins, Plant Performance, Employee Safety, Employee Performance and Performance Improvement Process. Each review team consisted of international and domestic members. The international reviewers were from IAEA, WANO and INPO. The domestic reviewers consisted of professors, Engineering Company, Research Institute and KHNP experts. The review confirmed safe and reliable operations of the 20 nuclear units. The common understanding resulted from the SSR is as follows. Firstly, KHNP corporate and its plants confirmed and shared mutual understanding on recurring areas for improvements, especially in the areas of Organizational Effectiveness, Industrial Safety, Human Performance, Configuration Management, Operations, Equipment Performance and Material Condition. Secondly, KHNP understood that plant and department level performances are directly related to the leadership and competency of the management team including supervisors. Thirdly, the strengths of individual stations that consistently have produced good results need to be shared with the other KHNP stations. Finally, KHNP learned that strong corporate leadership and support are needed to resolve most of the areas for improvement since they are common to all KHNP stations. (author)

  3. Review of probabilistic safety assessments by regulatory bodies

    International Nuclear Information System (INIS)

    2002-01-01

    This report provides guidance to assist regulatory bodies in carrying out reviews of the PSAs produced by utilities. In following this guidance, it is important that the regulatory body is able to satisfy itself that the PSA has been carried out to an acceptable standard and that it can be used for its intended applications. The review process becomes an important phase in determining the acceptability of the PSA since this provides a degree of assurance of the PSA scope, validity and limitations, as well as a better understanding of plants themselves. This report is also intended to assist technical experts managing or performing PSA reviews. A particular aim is to promote a standardized framework, terminology and form of documentation for the results of PSA reviews. The information presented in this report supports IAEA Safety Guide No. GS-G-1.2. Recommendations on the scope and methods to be used by the utility in the preparation of a PSA study is provided in IAEA Safety Guide No. NSG- 1.2. Information on these Safety Guides and other IAEA safety standards for nuclear power plants can be found on the following Internet site: http://www.iaea.org/ns/coordinet. The scope of this report covers the review of Level 1, 2 and 3 PSAs for event sequences occurring in all modes of plant operation (including full power, low power and shutdown). Where the scope of the analysis is narrower than this, a subset of the guidance can be identified and used. Information is provided on carrying out the review of a PSA throughout the PSA production process, i.e. from the initial decision to carry out the PSA through to the completion of the study and the production of the final PSA report. However, the same procedure can be applied to a completed PSA or to one already in progress. As a result of the performance of a PSA, changes to the design or operation of the plant are often identified that would increase the level of safety. This might include the addition of further safety

  4. Regulatory review of safety cases and safety assessments for near surface

    International Nuclear Information System (INIS)

    Nys, V.

    2003-01-01

    The activities of the ASAM Regulatory Review Working Group are presented. Regulatory review of the safety assessment is made. It includes the regulatory review of post-closure safety assessment; safety case development and confidence building. The ISAM methodology is reviewed and SA system description is presented. Recommendations on the review process management are given

  5. End of mission report on seismic safety review mission for Belene NPP site

    International Nuclear Information System (INIS)

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  6. Final Safety Analysis Document for Building 693 Chemical Waste Storage Building at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Salazar, R.J.; Lane, S.

    1992-02-01

    This Safety Analysis Document (SAD) for the Lawrence Livermore National Laboratory (LLNL) Building 693, Chemical Waste Storage Building (desipated as Building 693 Container Storage Unit in the Laboratory's RCRA Part B permit application), provides the necessary information and analyses to conclude that Building 693 can be operated at low risk without unduly endangering the safety of the building operating personnel or adversely affecting the public or the environment. This Building 693 SAD consists of eight sections and supporting appendices. Section 1 presents a summary of the facility designs and operations and Section 2 summarizes the safety analysis method and results. Section 3 describes the site, the facility desip, operations and management structure. Sections 4 and 5 present the safety analysis and operational safety requirements (OSRs). Section 6 reviews Hazardous Waste Management's (HWM) Quality Assurance (QA) program. Section 7 lists the references and background material used in the preparation of this report Section 8 lists acronyms, abbreviations and symbols. Appendices contain supporting analyses, definitions, and descriptions that are referenced in the body of this report

  7. Development of a draft of human factors safety review procedures for the Korean Next Generation Reactor

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C.

    2000-02-01

    In this study, a draft of Human Factors Engineering (HFE) Safety Review Procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE program management, human factors analyses, human factors design, and HFE verification and validation, based on section 15.1 'human factors engineering design process' and 15.2 'control room human factors engineering' of KNGR specific safety requirements and chapter 15 'human factors engineering' of KNGR safety regulatory guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system

  8. Transportation Safety Excellence in Operations Through Improved Transportation Safety Document

    International Nuclear Information System (INIS)

    Dr. Michael A. Lehto; MAL

    2007-01-01

    A recent accomplishment of the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) Nuclear Safety analysis group was to obtain DOE-ID approval for the inter-facility transfer of greater-than-Hazard-Category-3 quantity radioactive/fissionable waste in Department of Transportation (DOT) Type A drums at MFC. This accomplishment supported excellence in operations through safety analysis by better integrating nuclear safety requirements with waste requirements in the Transportation Safety Document (TSD); reducing container and transport costs; and making facility operations more efficient. The MFC TSD governs and controls the inter-facility transfer of greater-than-Hazard-Category-3 radioactive and/or fissionable materials in non-DOT approved containers. Previously, the TSD did not include the capability to transfer payloads of greater-than-Hazard-Category-3 radioactive and/or fissionable materials using DOT Type A drums. Previous practice was to package the waste materials to less-than-Hazard-Category-3 quantities when loading DOT Type A drums for transfer out of facilities to reduce facility waste accumulations. This practice allowed operations to proceed, but resulted in drums being loaded to less than the Waste Isolation Pilot Plant (WIPP) waste acceptance criteria (WAC) waste limits, which was not cost effective or operations friendly. An improved and revised safety analysis was used to gain DOE-ID approval for adding this container configuration to the MFC TSD safety basis. In the process of obtaining approval of the revised safety basis, safety analysis practices were used effectively to directly support excellence in operations. Several factors contributed to the success of MFC's effort to obtain approval for the use of DOT Type A drums, including two practices that could help in future safety basis changes at other facilities. (1) The process of incorporating the DOT Type A drums into the TSD at MFC helped to better integrate nuclear safety

  9. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sagar, Budhi (Center for Nuclear Waste Regulatory Analyses, Southwest Research Inst., San Antonio, TX (US)); Egan, Michael (Quintessa Limited, Henley-on-Thames (GB)); Roehlig, Klaus-Juergen (Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (DE)); Chapman, Neil (Independent Consultant (XX)); Wilmot, Roger (Galson Sciences Limited, Oakham (GB))

    2008-03-15

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM

  10. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  11. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  12. 14 CFR Appendix B of Part 415 - Safety Review Document Outline

    Science.gov (United States)

    2010-01-01

    ... Performance Graphs 2.0Launch Operator Organization (§ 415.111) 2.1Launch Operator Organization (§ 415.111 and... Plan 4.3.1Flight Safety Personnel 4.3.2Flight Safety Rules 4.3.3Flight Safety System Summary and... Instrumentation Plan 6.2Configuration Management and Control Plan 6.3Frequency Management Plan 6.4Flight...

  13. Safety review advisor

    International Nuclear Information System (INIS)

    Boshers, J.A.; Uhrig, R.E.; Alguindigue, I.A.; Burnett, C.G.

    1991-01-01

    The University of Tennessee's Nuclear Engineering department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, increase the efficiency, consistency, and thoroughness of the evaluation process, and provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer

  14. Review on conformance of JMTR reactor facility to safety design examination guides for water-cooled reactors for test and research

    International Nuclear Information System (INIS)

    Ide, Hiroshi; Naka, Michihiro; Sakuta, Yoshiyuki; Hori, Naohiko; Matsui, Yoshinori; Miyazawa, Masataka

    2009-03-01

    The safety design examination guides for water-cooled reactors for test and research are formulated as fundamental judgements on the basic design validity for licensing from a viewpoint of the safety. Taking the refurbishment opportunity of the JMTR, the conformance of the JMTR reactor facility to current safety design examination guides was reviewed with licensing documents, annexes and related documents. As a result, it was found that licensing documents fully satisfied the requirements of the current guides. Moreover, it was found that the JMTR reactor facility itself also satisfied the guides requirements as well as the safety performance, since the facility with safety function such as structure, systems, devices had been installed based on the licensing documents under the permission by the regulation authority. Important devices for safety have been produced under authorization of regulating authority. Therefore, it was confirmed that the licensing was conformed to guides, and that the JMTR has enough performance. (author)

  15. Grasping at Straws: Comments on the Alberta Pipeline Safety Review

    Directory of Open Access Journals (Sweden)

    Jennifer Winter

    2013-09-01

    Full Text Available The release last month of the Alberta Pipeline Safety Review was meant to be a symbol of the province’s renewed commitment to environmental responsibility as it aims for new export markets. The report’s authors, Group 10 Engineering, submitted 17 recommendations covering public safety and pipeline incidents, pipeline integrity management and pipeline safety near bodies of water — and many of them run the gamut from the obvious to the unhelpful to the contradictory. That the energy regulator ought to be staffed to do its job should go without saying; in fact, staffing levels were never identified as an issue. The recommendation that record retention and transfer requirements be defined for mergers and acquisitions, sales and takeovers is moot. There is no reason a purchasing party would not want all relevant documents, and no real way to enforce transparency if the seller opts to withhold information. Harmonizing regulations between provinces could reduce companies’ cost of doing business, but could also prove challenging if different jurisdictions use performance-based regulations — which is what the Review recommended Alberta consider. This very brief paper pries apart the Review’s flaws and recommends that the province go back to the drawing board. Safety is a serious issue; a genuine statistical review linking pipeline characteristics to failures and risk-mitigation activities would be a better alternative by far.

  16. System specification/system design document comment review: Plutonium Stabilization and Packaging System. Notes of conference

    International Nuclear Information System (INIS)

    1996-01-01

    A meeting was held between DOE personnel and the BNFL team to review the proposed resolutions to DOE comments on the initial issue of the system specification and system design document for the Plutonium Stabilization and Packaging System. The objectives of this project are to design, fabricate, install, and start up a glovebox system for the safe repackaging of plutonium oxide and metal, with a requirement of a 50-year storage period. The areas discussed at the meeting were: nitrogen in can; moisture instrumentation; glovebox atmosphere; can marking bar coding; weld quality; NFPA-101 references; inner can swabbing; ultimate storage environment; throughput; convenience can screw-top design; furnacetrays; authorization basis; compactor safety; schedule for DOE review actions; fire protection; criticality safety; applicable standards; approach to MC and A; homogeneous oxide; resistance welder power; and tray overfill. Revised resolutions were drafted and are presented

  17. Dam safety review using non-destructive methods for reinforced concrete structure

    Energy Technology Data Exchange (ETDEWEB)

    Philibert, Alain; Saint-Pierre, Francois; Turcotte, Bernard [Le Groupe S.M. International Inc., Sherbrooke, (Canada)

    2010-07-01

    Dams built at the beginning of the twentieth century include concrete structures that were put in under rehabilitation works. In some cases, the details of the structures are not well documented. In other cases, concrete damage can be hidden under new layers of undamaged material. This requires that the dam safety review in a real investigation gather the information necessary for carrying out the hydraulic and stability studies required by the Dam Safety Act. This paper presented the process of dam safety review using non-destructive methods for reinforced concrete structures. Two reinforced concrete dams built in the 1900's, the Eustic dam on the Coaticook River and the Frontenac dam on the Magog River near Sherbrooke, were evaluated by S.M. International using non-destructive methods such as sonic and ground penetrating radar methods. The studies allowed mapping of concrete damage and provided geometric information on some non visible structure elements that were part of previous reinforcement operations.

  18. US nuclear safety review and experience

    International Nuclear Information System (INIS)

    Gilinsky, V.

    1977-01-01

    The nuclear safety review of commercial nuclear power reactors has changed over the years from the relatively simple review of Dresden 1 in 1955 to the highly complex and sophisticated regulatory process which characterizes today's reviews. Four factors have influenced this evolution: (1) maturing of the technology and industry; (2) development of the regulatory process and associated staff; (3) feedback of operating experience; and (4) public awareness and participation. The NRC's safety review responsibilities start before an application is tendered and end when the plant is decommissioned. The safety review for reactor licensing is a comprehensive, two-phase process designed to assure that all the established conservative acceptance criteria are satisfied. Operational safety is assured through a strong inspection and enforcement program which includes shutting down operating facilities when necessary to protect the health and safety of the public. The safety of operating reactors is further insured through close regulation of license changes and selective backfitting of new regulatory requirements. An effective NRC standards development program has been implemented and coordinates closely with the national standards program. A confirmatory safety research program has been developed. Both of these efforts are invaluable to the nuclear safety review because they provide the staff with key tools needed to carry out its regulatory responsibilities. Both have been given increased emphasis since the formation of the NRC in 1975. The safety review process will continue to evolve, but changes will be slower and more deliberate. It will be influenced by standardization, early site reviews and development of advanced reactor concepts. New legislation may make possible changes which will simplify and shorten the regulatory process. Certainly the experience provided by the increasing number and types of operating plants will have a very strong impact on future trends in the

  19. Re-assessment of seismic loads in conjunction with periodic safety review

    International Nuclear Information System (INIS)

    Jonczyk, Josef

    2002-01-01

    The objective of this paper is the fundamental consideration of a safeguard-aim-oriented approach for use in the re-assessment of seismic events with regard to the periodic safety review (PSR) of nuclear power plants (NPP). The re-assessment aspects of site-specific design earthquakes (DEQ), specially the procedure for seismic hazard analysis, will not, however, be considered in detail here. The proposed assessment concept clearly presents a general approach for safety assessments. The approach is based on a successive screening review of components that are considered sufficiently earthquake-resistant. In this respect, the principle of maximum practical application of the design documentation has been considered in the re-assessment process. On the other hand, the safeguard-aim-oriented evaluation will also be applied with regard to whether the requirements of the safety regulations are fulfilled with respect to the safety goals. The review in conjunction with PSR does not, however, attempt to perform this under all technical aspects. Moreover, it is possible to make extensive use of experimental knowledge and engineering judgement with regard to the structural capacity behaviour in case of a seismic event. Compared with design procedures, however, this proposed approach differs from the one applied in licensing procedures, in which such assessment freedom will not usually be exhausted. (author)

  20. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  1. Safety review advisor

    International Nuclear Information System (INIS)

    Boshers, J.A.; Alguindigue, I.E.; Uhrig, R.E.

    1989-01-01

    The University of Tennessee's Nuclear Engineering Department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to (1) aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, (2) increase the efficiency, consistency, and thoroughness of the evaluation process, and (3) provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer. 6 refs., 2 figs

  2. Development of safety and regulatory requirements for Korean next generation reactor - Development of human factors design review guidelines (II)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Lee, Hyun Chul; Cheon, Se Woo [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-02-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25. Human Factors Engineering Program Review Model' and '26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and the characteristics of the KNGR design, and reviewing the reference documents of NURGE-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides at KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system design review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we updated the guidelines by reviewing the literature related to alarm design that published after 1994. 12 refs., 11 figs., 2 tabs. (Author)

  3. Development of safety and regulatory requirements for Korean next generation reactor - Development of human factors design review guidelines (II)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Lee, Hyun Chul; Cheon, Se Woo [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-02-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25. Human Factors Engineering Program Review Model' and '26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and the characteristics of the KNGR design, and reviewing the reference documents of NURGE-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides at KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system design review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we updated the guidelines by reviewing the literature related to alarm design that published after 1994. 12 refs., 11 figs., 2 tabs. (Author)

  4. Development of a draft of human factors safety review procedures for the Korean next generation reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-02-01

    In this study, a draft of human factors engineering (HFE) safety review procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE Program Management, Human Factors Analyses, Human Factors Design, and HFE Verification and Validation, based on Section 15.1 'Human Factors Engineering Design Process' and 15.2 'Control Room Human Factors Engineering' of KNGR Specific Safety Requirements and Chapter 15 'Human Factors Engineering' of KNGR Safety Regulatory Guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system. 8 refs., 2 figs. (Author)

  5. Human Factors Evaluation of Procedures for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the results of human factors assessment on the plant operating procedures as part of Periodic Safety Review(PSR) of Yonggwang Nuclear Power Plant Unit no. 1, 2. The suitability of item and appropriateness of format and structure in the key operating procedures of nuclear power plants were investigated by the review of plant operating experiences and procedure documents, field survey, and experimental assessment on some part of procedures. A checklist was used to perform this assessment and record the review results. The reviewed procedures include EOP(Emergency Operating Procedures), GOP(General Operating Procedures), AOP(Abnormal Operating Procedures), and management procedures of some technical departments. As results of the assessments, any significant problem challenging the safety was not found on the human factors in the operating procedures. However, several small items to be changed and improved were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on the operating procedure.

  6. A review of the report ''IAEA safety targets and probabilistic risk assessment'' prepared for Greenpeace International

    International Nuclear Information System (INIS)

    1991-01-01

    At the request of the Director General, INSAG reviewed the report ''IAEA Safety Targets and Probabilistic Risk Assessment'' prepared for Greenpeace International by the Gesellschaft fuer Oekologische Forschung und Beratung mbH, Hannover, Germany. The conclusions of the report as well as the review results of INSAG experts are reproduced in this document

  7. 33 CFR 96.250 - What documents and reports must a safety management system have?

    Science.gov (United States)

    2010-07-01

    ... safety management system have? 96.250 Section 96.250 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.250 What documents and...

  8. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Lee, K. H.; Hur, K. Y.; Lee, S. J.; Choi, S. S.; Kang, C. M.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS (Korea Institute of Nuclear Safety). The Safety Review Advisory System(SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  9. Review of SKB's Safety Assessment SR-Can: Contributions in Support of SKI's and SSI's Review by External Consultants

    International Nuclear Information System (INIS)

    2008-03-01

    The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear fuel in Sweden 2010. In support of this application SKB will present a safety report, SR-Site, on the repository's long-term safety and radiological consequences. As a preparation for SR-Site, SKB published the preliminary safety assessment SR-Can in November 2006. The purposes were to document a first evaluation of long-term safety for the two candidate sites at Forsmark and Laxemar and to provide feedback to SKB's future programme of work. An important objective of the authorities' review of SR-Can is to provide guidance to SKB on the complete safety reporting for the license application. The authorities have engaged external experts for independent modelling, analysis and review, with the aim to provide a range of expert opinions related to the sufficiency and appropriateness of various aspects of SR-Can. The conclusions and judgments in this report are those of the authors and may not necessarily coincide with those of SKI and SSI. The authorities own review will be published separately (SKI Report 2008:23, SSI Report 2008:04 E). This report compiles contributions from several specific research projects. The separate reviews cover topics regarding the engineered barrier system, the quality assurance, the climate evolution and its effects, and the ecosystems and environmental impacts. All contributions are in English apart from the review concerning ecosystems and environmental impacts, which is presented in Swedish

  10. Human factors evaluation of man-machine interface for periodic safety review of nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang; Hwang, In Koo; Lee, Hyun Cheol; Jang, Tong Il; Ku, Jin Young; Kim, Soo Jin

    2004-12-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Nuclear Power Plants(NPPs). As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  11. SKI's and SSI's review of SKB's safety report SR-Can

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Stroemberg, Bo

    2008-03-01

    This report summarises SKI's and SSI's joint review of the Swedish Nuclear Fuel and Waste Management Co's (SKB) safety report SR-Can (SKB TR-06-09). SR-Can is the first assessment of post-closure safety for a KBS-3 spent nuclear fuel repository at the candidate sites Forsmark and Laxemar, respectively. The analysis builds on data from the initial stage of SKB's surface-based site investigations and on data from full-scale manufacturing and testing of buffer and copper canisters. SR-Can can be regarded as a preliminary version of the safety report that will be required in connection with SKB's planned licence application for a final repository in late 2009. The main purpose of the authorities' review is to provide feedback to SKB on their safety reporting as part of the pre-licensing consultation process. However, SR-Can is not part of the formal licensing process. In support of the authorities' review three international peer review teams were set up to make independent reviews of SR-Can from three perspectives, namely integration of site data, representation of the engineered barriers and safety assessment methodology, respectively. Further, several external experts and consultants have been engaged to review detailed technical and scientific issues in SR-Can. The municipalities of Oesthammar and Oskarshamn where SKB is conducting site investigations, as well NGOs involved in SKB's programme, have been invited to provide their views on SR-Can as input to the authorities' review. Finally, the authorities themselves, and with the help of consultants, have used independent models to reproduce part of SKB's calculations and to make complementary calculations. All supporting review documents are published in SKI's and SSI's report series. The main findings of the review are: -SKB's safety assessment methodology is overall in accordance with applicable regulations, but part of the methodology needs to be further developed for the licence application. -SKB's quality

  12. CP-50 calibration facility radiological safety assessment document

    International Nuclear Information System (INIS)

    Chilton, M.W.; Hill, R.L.; Eubank, B.F.

    1980-03-01

    The CP-50 Calibration Facility Radiological Safety Assessment document, prepared at the request of the Nevada Operations Office of the US Department of Energy to satisfy provisions of ERDA Manual Chapter 0531, presents design features, systems controls, and procedures used in the operation of the calibration facility. Site and facility characteristics and routine and non-routine operations, including hypothetical incidents or accidents are discussed and design factors, source control systems, and radiation monitoring considerations are described

  13. Response to Absorber-Focus Coil Preliminary Safety Review Panel

    International Nuclear Information System (INIS)

    Barr, Giles; Baynham, Elwyn; Black, Edgar; Bradshaw, Tom; Cummings, Mary Anne; Green, Michael A.; Ishimoto, Shigeru; Ivanyushenkov, Yury; Lau, Wing; Zisman, Michael S.

    2004-01-01

    In this document we provide responses to the various issues raised in the report of the Preliminary Safety Review Panel (see http://mice.iit.edu/mnp/MICE0069.pdf). In some cases we have made design changes in response to the Panels suggestions. In other cases, we have chosen not to do so. In a few cases, we indicate our plans, although the tasks have not yet been completed. For simplicity, the responses are organized along the same lines as those of the Panel Report

  14. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Hur, K. Y.; Lee, S. J.; Choi, S. J.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS. Safety Review Advisory System (SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  15. Review and assessments of potential environmental, health and safety impacts of MHD technology. Final draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The purpose of this document is to develop an environmental, health and safety (EH and S) assessment and begin a site - specific assessment of these and socio - economic impacts for the magnetohydrodynamics program of the United States Department of Energy. This assessment includes detailed scientific and technical information on the specific EH and S issues mentioned in the MHD Environmental Development Plan. A review of current literature on impact-related subjects is also included. This document addresses the coal-fired, open-cycle MHD technology and reviews and assesses potential EH and S impacts resulting from operation of commercially-installed technology.

  16. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    International Nuclear Information System (INIS)

    Song, Tae Young

    2007-01-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas

  17. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    Energy Technology Data Exchange (ETDEWEB)

    Song, Tae Young [Nuclear Engineering and Technology Institute, Daejeon (Korea, Republic of)

    2007-07-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas.

  18. International review of Kursk unit 1 in-depth safety analysis report

    International Nuclear Information System (INIS)

    Chouha, M.; Bolshov, L.; Butcher, P.; Janke, R.; Parsons, T.; Weber, J.P.

    2004-01-01

    The paper presents the objectives, organisation, main findings and conclusions of the international review of the Kursk unit 1 safety analysis report (K1IRSR). The K1IRSR was administered by RISKAUDIT IRSN/GRS international and carried out by international experts from 7 western countries plus the Russian Federation, under the supervision of the safety review group (SRG) of the European bank for reconstruction and development (EBRD). The project was financed by the nuclear safety account (NSA) administered by the EBRD. The Russian experts worked under a contract with IBRAE financed by Rosenergoatom. The main conclusions were that the SAR followed a correct approach, broadly in line with Russian and international guidance documents, but needed improvement in structure and content. It established that the safety level of the unit has been increased significantly by the modernisation programme. The important deviations of the unit from current Russian regulations and the IAEA safety issues for RBMK are either fully resolved or are being addressed to the extent possible by compensatory measures to further reduce the risk. The K1IRSR experts have made a number of recommendations for improvement of the K1SAR. The authors agreed to take the recommendations into account in future revision of the K1SAR. (orig.)

  19. Regulatory Aspect of Periodic Safety Review Performed in Nuclear Power Plants in the Slovak Republic

    International Nuclear Information System (INIS)

    Baszo, Z.

    2010-01-01

    The paper deals with the regulatory aspect of Nuclear Power Plant (NPP) Periodic Safety Review (PSR) as a part of license renewal process in the Slovak Republic. It summarizes the history of activities similar to PSR performed in the past for NPPs operated in the Slovak Republic. Furthermore, it describes both the requirements involved in the current Slovak legislation to be met by licensee in the Slovak Republic in this field and the procedures concerning the PSR as well. The objective and rules of PSR to be performed for NPPs in the Slovak Republic were derived from the internationally accepted International Atomic Energy Agency (IAEA) document and have been implemented into national legislation. PSR of two twin units located in Bohunice NPP and Mochovce NPP, respectively, has been initiated in the Slovak Republic based on evaluation of each area to be reviewed (safety factors) using recent methodology and practice. Other significant factors, such as ageing, modifications of NPP and the safe operation for a specified future period, have to be assessed in the frame of PSR. Report on performed PSR outlines the results of review for each area, the corrective plan, which considering mutual relations between assessed areas specifies the issues to be solved with the aim to eliminate shortcomings identified in the frame of PSR and to adopt safety improvements. The findings from PSR in the evaluated areas also serve as a source of information for updating of all documents to be attached to the written application of licensee for renewal of a nuclear power plant operating license. The presented procedure describes how the Nuclear Regulatory Authority of the Slovak Republic (UJD SR) has reviewed the documents submitted during PSR. Based on results of submitted documents evaluation and licensee application for license renewal the license for next 10 years operation has been issued for Bohunice NPP. At present, similar procedure for Mochovce NPP unit 1 and 2 is underway.(author).

  20. Health Information Technology, Patient Safety, and Professional Nursing Care Documentation in Acute Care Settings.

    Science.gov (United States)

    Lavin, Mary Ann; Harper, Ellen; Barr, Nancy

    2015-04-14

    The electronic health record (EHR) is a documentation tool that yields data useful in enhancing patient safety, evaluating care quality, maximizing efficiency, and measuring staffing needs. Although nurses applaud the EHR, they also indicate dissatisfaction with its design and cumbersome electronic processes. This article describes the views of nurses shared by members of the Nursing Practice Committee of the Missouri Nurses Association; it encourages nurses to share their EHR concerns with Information Technology (IT) staff and vendors and to take their place at the table when nursing-related IT decisions are made. In this article, we describe the experiential-reflective reasoning and action model used to understand staff nurses' perspectives, share committee reflections and recommendations for improving both documentation and documentation technology, and conclude by encouraging nurses to develop their documentation and informatics skills. Nursing issues include medication safety, documentation and standards of practice, and EHR efficiency. IT concerns include interoperability, vendors, innovation, nursing voice, education, and collaboration.

  1. Critical Review of Commercial Secondary Lithium-Ion Battery Safety Standards

    Science.gov (United States)

    Jones, Harry P.; Chapin, Thomas, J.; Tabaddor, Mahmod

    2010-09-01

    The development of Li-ion cells with greater energy density has lead to safety concerns that must be carefully assessed as Li-ion cells power a wide range of products from consumer electronics to electric vehicles to space applications. Documented field failures and product recalls for Li-ion cells, mostly for consumer electronic products, highlight the risk of fire, smoke, and even explosion. These failures have been attributed to the occurrence of internal short circuits and the subsequent thermal runaway that can lead to fire and explosion. As packaging for some applications include a large number of cells, the risk of failure is likely to be magnified. To address concerns about the safety of battery powered products, safety standards have been developed. This paper provides a review of various international safety standards specific to lithium-ion cells. This paper shows that though the standards are harmonized on a host of abuse conditions, most lack a test simulating internal short circuits. This paper describes some efforts to introduce internal short circuit tests into safety standards.

  2. IMPLEMENTING CHANGES TO AN APPROVED AND IN-USE DOCUMENTED SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    KING JP

    2008-01-01

    The Plutonium Finishing Plant (PFP) has refined a process to ensure a comprehensive and complete DSA/TSR change implementation. Successful Nuclear Facility Safety Basis implementation is essential to avoid creating a Potential Inadequacy in Safety Analysis (PISA) situation, or implementing a facility into a non-compliance that can result in a TSR violation. Once past initial implementation, additional changes to Documented Safety Analysis (DSA) and Technical Safety Requirements (TSRs) are often needed due to needed requirement clarifications, operating experience indicating that Conditions/Required Actions/Surveillance Requirements could be improved, changes in facility conditions, or changes in facility mission etc. An effective change implementation process is essential to ensuring compliance with 10 CFR 830.202(a), 'The contractor responsible for a hazard category 1,2, or 3 DOE nuclear facility must establish and maintain the safety basis for the facility'

  3. Guidelines for the review of accident management programmes in nuclear power plants. Reference document for the IAEA safety service missions on review of accident management programmes in nuclear power plants

    International Nuclear Information System (INIS)

    2003-01-01

    Similarly as for other IAEA safety services, the objectives of accident management safety service are to assist the Member States in ensuring and enhancing the safety of NPPs. In particular, the objective is to assist at the utility and NPP (i.e. licensee) level in effective plant specific AMP preparation, development and implementation. However, assistance can also be provided to the regulatory body in its reviewing of AMPs. Objectives of the safety service can be summarized as follows: To explain to licensee personnel principles and possible approaches in effective implementation of AMP based on experience world-wide; To give opportunities to experts from the host plant to broaden their experience and knowledge in the field; To perform an objective assessment of the status in various phases of AMP implementation, compared with international experience and practices; To provide the licensee with suggestions and assistance for improvements in various stages of AMP implementation. The objective of the IAEA safety services is to offer two options to respond to individual requirements. These options include missions to review accident analysis needed for accident management and missions to review the whole AMP. Review of accident analysis for accident management (RAAAM): this review is intended to check completeness and quality of accident analysis covering BDBA and severe accidents. The review should be typically performed prior to use of accident analysis for development of AMP. It is considered that 2 experts and 1 IAEA team leader in one-week mission can perform the review. Detailed guidelines for review of analysis are provided in Section 2. Reference is also made to another IAEA Safety Report (Safety Standards Series No. NS-R-1) which is devoted to guidance for accident analysis of nuclear power plants (NPPs). Review of AMP (RAMP): this review of AMP, which is in particular appropriate prior to its implementation, is intended to check its quality, consistency

  4. IAEA Concludes Safety Review at Gravelines Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted a series of good practices and made recommendations to reinforce some safety measures during a review of operational safety at France's Gravelines Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 12 November 2012, focused on aspects essential to the safe operation of the NPP. The team was composed of experts from Bulgaria, China, Germany, Hungary, Japan, Romania, Slovakia, South Africa, Spain, Ukraine and the IAEA. The review covered the areas of management, organization and administration; training and qualification; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their possible use elsewhere. Examples include the following: - The Power Plant uses a staff-skills mapping process that significantly enhances knowledge of the facility's collective and individual skills and provides proactive management to address the loss of such skills; - As a measure to reduce the risk of workers' radiation exposure, the Power Plant uses a system to ensure that dose rate measurements are carried out at a precise distance from the source of radiation; and - Flood protection of the Power Plant is supported by special technical guidance documents and associated arrangements. The team identified a number of proposals for improvements to operational safety at Gravelines NPP. Examples include the following: - The Power Plant should reinforce its measures to prevent foreign objects from entering plant systems; - The Power Plant should ensure the 24-hour presence of an operator

  5. Report of the review committee on evaluation of the R and D subjects in the field of nuclear safety research

    International Nuclear Information System (INIS)

    2000-09-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee and Research Evaluation Committee, the Ad Hoc Review Committee on Nuclear Safety Research composed of twelve experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY2000 in the Nuclear Safety Research Center (Department of Reactor Safety Research, Department of Fuel Cycle Safety Research and Department of Safety Research Technical Support). The Ad Hoc Review Committee meeting was held on January 20, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  6. Review Document: Full Software Trigger

    CERN Document Server

    Albrecht, J; Raven, G

    2014-01-01

    This document presents a trigger system for the upgraded LHCb detector, scheduled to begin operation in 2020. This document serves as input for the internal review towards the "DAQ, online and trigger TDR". The proposed trigger system is implemented entirely in software. In this document we show that track reconstruction of a similar quality to that available in the offline algorithms can be performed on the full inelastic $pp$-collision rate, without prior event selections implemented in custom hardware and without relying upon a partial event reconstruction. A track nding eciency of 98.8 % relative to oine can be achieved for tracks with $p_T >$ 500 MeV/$c$. The CPU time required for this reconstruction is about 40 % of the available budget. Proof-of-principle selections are presented which demonstrate that excellent performance is achievable using an inclusive beauty trigger, in addition to exclusive beauty and charm triggers. Finally, it is shown that exclusive beauty and charm selections that do not intr...

  7. Documented Safety Analysis for the B695 Segment

    Energy Technology Data Exchange (ETDEWEB)

    Laycak, D

    2008-09-11

    This Documented Safety Analysis (DSA) was prepared for the Lawrence Livermore National Laboratory (LLNL) Building 695 (B695) Segment of the Decontamination and Waste Treatment Facility (DWTF). The report provides comprehensive information on design and operations, including safety programs and safety structures, systems and components to address the potential process-related hazards, natural phenomena, and external hazards that can affect the public, facility workers, and the environment. Consideration is given to all modes of operation, including the potential for both equipment failure and human error. The facilities known collectively as the DWTF are used by LLNL's Radioactive and Hazardous Waste Management (RHWM) Division to store and treat regulated wastes generated at LLNL. RHWM generally processes low-level radioactive waste with no, or extremely low, concentrations of transuranics (e.g., much less than 100 nCi/g). Wastes processed often contain only depleted uranium and beta- and gamma-emitting nuclides, e.g., {sup 90}Sr, {sup 137}Cs, or {sup 3}H. The mission of the B695 Segment centers on container storage, lab-packing, repacking, overpacking, bulking, sampling, waste transfer, and waste treatment. The B695 Segment is used for storage of radioactive waste (including transuranic and low-level), hazardous, nonhazardous, mixed, and other waste. Storage of hazardous and mixed waste in B695 Segment facilities is in compliance with the Resource Conservation and Recovery Act (RCRA). LLNL is operated by the Lawrence Livermore National Security, LLC, for the Department of Energy (DOE). The B695 Segment is operated by the RHWM Division of LLNL. Many operations in the B695 Segment are performed under a Resource Conservation and Recovery Act (RCRA) operation plan, similar to commercial treatment operations with best demonstrated available technologies. The buildings of the B695 Segment were designed and built considering such operations, using proven building

  8. Documented Safety Analysis for the B695 Segment

    International Nuclear Information System (INIS)

    Laycak, D.

    2008-01-01

    This Documented Safety Analysis (DSA) was prepared for the Lawrence Livermore National Laboratory (LLNL) Building 695 (B695) Segment of the Decontamination and Waste Treatment Facility (DWTF). The report provides comprehensive information on design and operations, including safety programs and safety structures, systems and components to address the potential process-related hazards, natural phenomena, and external hazards that can affect the public, facility workers, and the environment. Consideration is given to all modes of operation, including the potential for both equipment failure and human error. The facilities known collectively as the DWTF are used by LLNL's Radioactive and Hazardous Waste Management (RHWM) Division to store and treat regulated wastes generated at LLNL. RHWM generally processes low-level radioactive waste with no, or extremely low, concentrations of transuranics (e.g., much less than 100 nCi/g). Wastes processed often contain only depleted uranium and beta- and gamma-emitting nuclides, e.g., 90 Sr, 137 Cs, or 3 H. The mission of the B695 Segment centers on container storage, lab-packing, repacking, overpacking, bulking, sampling, waste transfer, and waste treatment. The B695 Segment is used for storage of radioactive waste (including transuranic and low-level), hazardous, nonhazardous, mixed, and other waste. Storage of hazardous and mixed waste in B695 Segment facilities is in compliance with the Resource Conservation and Recovery Act (RCRA). LLNL is operated by the Lawrence Livermore National Security, LLC, for the Department of Energy (DOE). The B695 Segment is operated by the RHWM Division of LLNL. Many operations in the B695 Segment are performed under a Resource Conservation and Recovery Act (RCRA) operation plan, similar to commercial treatment operations with best demonstrated available technologies. The buildings of the B695 Segment were designed and built considering such operations, using proven building systems, and keeping

  9. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-01-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  10. Safety assessment of Olkiluoto NPP units 1 and 2. Decision of the Radiation and Nuclear Safety Authority regarding the periodic safety review of the Olkiluoto NPP

    International Nuclear Information System (INIS)

    2010-02-01

    the principle of continuous improvement of safety provided in section 7 a of the Nuclear Energy Act.The safety of the plant will be further improved during the current operating licence period. Based on the periodic safety review, TVO has submitted to STUK action plans for the observed points requiring improvement. STUK included also some additional requirements in the decision relating to the periodic safety review. Action plans and additional requirements were for example related to diversification of the safety related systems, development of the lifecycle management of electronic and I and C equipment qualified for demanding conditions and ensuring the competence of personnel. As a summary of the review of the issues and documentation pertaining to the periodic safety review and the continuous oversight results, STUK notes that the safety of the Olkiluoto nuclear power plant units 1 and 2 is sufficient and the licensee utilises the necessary arrangements to continue the safe operation of the plants. (orig.)

  11. An international review of patient safety measures in radiotherapy practice

    International Nuclear Information System (INIS)

    Shafiq, Jesmin; Barton, Michael; Noble, Douglas; Lemer, Claire; Donaldson, Liam J.

    2009-01-01

    Errors from radiotherapy machine or software malfunction usually are well documented as they affect hundreds of patients, whereas random errors affecting individual patients are more difficult to be discovered and prevented. Although major clinical radiotherapy incidents have been reported, many more have remained unrecognised or have not been reported. The literature in this field is limited as it is mostly published as a result of investigation of major errors. We present a review of radiotherapy incidents internationally with the aim of identifying the domains where most errors occur through extensive review and synthesis of published reports, unpublished 'Grey literature' and departmental incident data. Our review of radiotherapy-related events in the last three decades (1976-2007) identified more than seven thousand (N = 7741) incidents and near misses. Three thousand one hundred and twenty-five incidents reported patient harm of variable intensity ranging from underdose increasing the risk of recurrence, to overdose causing toxicity, and even death for 1% (N = 38); 4616 events were near misses with no recognisable patient harm. Based on our review, a radiotherapy risk profile has been published by the WHO World Alliance for Patient Safety that highlights the role of communication, training and strict adherence to guidelines/protocols in improving the safety of radiotherapy process.

  12. The value of safety and safety as a value

    NARCIS (Netherlands)

    Ratilainen, H.; Salminen, S.; Zwetsloot, G.I.J.M.; Perttula, P.; Starren, A.; Steijn, W.; Pahkin, K.; Drupsteen, L.; Puro, V.; Räsänen, T.; Aaltonen, M.; Berkers, F.; Kalakoski, V.

    2016-01-01

    The research presented in this document analyzes how safety values are defined and used in practice, in particular by managers, and how they affect employers’ and employees’ decisions and behaviour at work. The work comprises three complementary activities: a literature review on the value of safety

  13. International experts conclude IAEA peer review of Iran's safety regulation of Bushehr NPP

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear safety experts today completed an IAEA mission to review the effectiveness of Iran's safety regulation of its first nuclear power plant and to identify possible improvements before the plant begins operation. Upon invitation of the Islamic Republic of Iran, the International Atomic Energy Agency (IAEA) assembled a team of senior regulators from seven Member States for an Integrated Regulatory Review Service (IRRS) mission. The scope of the mission was limited to the safety regulation of Bushehr nuclear power plant (BNPP-1). The IRRS review took place from 20 February to 2 March at the INRA offices in Tehran and included a technical visit to the BNPP-1 site. The mission was an objective peer review based on IAEA safety standards, and was neither an inspection, nor an audit. Ms. Olena Mykolaichuk, IRRS Team Leader and Head of the State Nuclear Regulatory Committee of Ukraine, commended her INRA counterparts: 'The regulatory work performed on the Bushehr construction and in preparation for commissioning has demonstrated significant progress of INRA as a nuclear regulatory authority,' she said. Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division, added: 'Through this IRRS mission, both Iran and the international experts contribute to the enhancement of nuclear safety and worldwide experience sharing.' In the course of its review the IRRS team identified the following strengths: - INRA has a dedicated, conscientious staff, demonstrating clear commitments to further improvements. - INRA clearly recognizes the value of peer reviews and international cooperation regarding nuclear safety. - Despite a shortage of staff, INRA demonstrated strong leadership while performing both review and assessment and inspection tasks during the BNPP-1 construction and pre-commissioning. - INRA has developed an excellent computerized documentation control system. Recommendations and suggestions to improve INRA's regulatory

  14. Review of Nuclear Criticality Safety Requirements Implementation for Hanford Tank Farms Facility

    International Nuclear Information System (INIS)

    DEFIGH PRICE, C.

    2000-01-01

    In November 1999, the Deputy Secretary of the Department of Energy directed a series of actions to strengthen the Department's ongoing nuclear criticality safety programs. A Review Plan describing lines of inquiry for assessing contractor programs was included. The Office of River Protection completed their assessment of the Tank Farm Contractor program in May 2000. This document supports that assessment by providing a compliance statement for each line of inquiry

  15. Pharmacist medication reviews to improve safety monitoring in primary care patients.

    Science.gov (United States)

    Gallimore, Casey E; Sokhal, Dimmy; Zeidler Schreiter, Elizabeth; Margolis, Amanda R

    2016-06-01

    Patients prescribed psychotropic medications within primary care are at risk of suboptimal monitoring. It is unknown whether pharmacists can improve medication safety through targeted monitoring of at risk populations. Access Community Health Centers implemented a quality improvement pilot project that included pharmacists on an integrated care team to provide medication reviews for patients. Aims were to determine whether inclusion of a pharmacist performing medication reviews within a primary care behavioral health (PCBH) practice is feasible and facilitates safe medication use. Pharmacists performed medication reviews of the electronic health record for patients referred for psychiatry consultation. Reviews were performed 1-3 months following consultation and focused on medications with known suboptimal monitoring rates. Reviews were documented within the EHR and routed to the primary care provider. Primary outcome measures were change in percentage up-to-date on monitoring and AIMS assessment, and at risk of experiencing drug interaction(s) between baseline and 3 months postreview. Secondary outcome was provider opinion of medication reviews collected via electronic survey. Reviews were performed for 144 patients. Three months postreview, percentage up-to-date on recommended monitoring increased 18% (p = .0001), at risk for drug interaction decreased 20% (p improved safety monitoring of psychotropic medications. Results identify key areas for improvement that other clinics considering integration of similar pharmacy services should consider. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  16. International Nuclear Officials Discuss IAEA Peer Reviews of Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    2011-01-01

    Board of Governors meeting in November. ''The strong support expressed by senior regulators for the IAEA peer reviews of the nuclear regulatory framework and their concrete proposals for improvement will contribute significantly to the effective implementation of the IAEA Nuclear Safety Action Plan,'' said Denis Flory, IAEA Deputy Director General for Nuclear Safety and Security. ''There was a general recognition that these peer reviews provide national nuclear regulators with an objective view of their strengths and weaknesses and contribute to the continuous strengthening of nuclear safety.'' Background IRRS missions are designed to strengthen and enhance the effectiveness of the national nuclear regulatory infrastructure of States, while recognizing the ultimate responsibility of each State to ensure safety in this area. The reviews are invited by individual Member States, who undergo a rigorous self-assessment in advance of the mission. In accordance with the approved IAEA Nuclear Safety Action Plan the host nations are encouraged to invite a follow-up mission within 3 years. Nineteen nations have hosted IRRS reviews since the service became available in 2006, and there have been two lessons-learned workshops, in 2007 and 2008. The IRRS reviews consider regulatory, technical and policy issues, with comparisons against IAEA Safety Standards and, where appropriate, good practices elsewhere. During an IRRS mission, recommendations and suggestions are offered to the host country. Recommendations are related to items of direct relevance to safety as referenced in IAEA Safety Requirements, while suggestions relate to items not essential to compliance with international standards, but which might enhance the effectiveness of the national nuclear and radiation safety regime and/or improve the organization or performance of the regulatory body. Commendable good practices may be identified and documented for consideration by other States. (IAEA)

  17. Guidance for preparation of safety analysis reports for nonreactor facilities and operations

    International Nuclear Information System (INIS)

    1992-01-01

    Department of Energy (DOE) Orders 5480.23, ''Nuclear Safety Analysis Reports,'' and 5481.1B, ''Safety Analysis and Review System'' require the preparation of appropriate safety analyses for each DOE operation and subsequent significant modifications including decommissioning, and independent review of each safety analysis. The purpose of this guide is to assist in the preparation and review of safety documentation for Oak Ridge Field Office (OR) nonreactor facilities and operation. Appendix A lists DOE Orders, NRC Regulatory Guides and other documents applicable to the preparation of safety analysis reports

  18. Research on review technology for three key safety factors of periodic safety review (PSR) and its application to Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Xu Shoulv; Yao Weida; Dou Yikang; Lin Shaoxuan; Cao Yenan; Zhou Quanfu; Zheng Jiong; Zhang Ming

    2009-04-01

    In 2001, after 10 years' operation, Qinshan Nuclear Power Plant (Q1) started to carry out periodic safety review (PSR) based on a nuclear safety guideline, Periodic Safety Review for Operational Nuclear Power Plants (HAF0312), issued by National Nuclear Safety Administration of China (NNSA). Entrusted by the owner of Q1, Shanghai Nuclear Engineering Research and Design Institute (SNERDI) implemented reviews of three key safety factors including safety analysis, equipment qualification and ageing. PSR was a challenging work in China at that time and through three years' research and practice, SNERDI summarized a systematic achievement for the review including review methodology, scoping, review contents and implementation steps, etc.. During the process of review for the three safety factors, totally 148 review reports and 341 recommendations for corrections were submitted to Q1. These reports and recommendations have provided guidance for correction actions as follow-up of PSR. This paper focuses on technical aspects to carry out PSR for the above-mentioned three safety factors, including review scoping, contents, methodology and main steps. The review technology and relevant experience can be taken for reference for other NPPs to carry out PSR. (authors)

  19. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  20. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    International Nuclear Information System (INIS)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang

    2006-01-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  1. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area.

  2. Lift truck safety review

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter`s Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given.

  3. Lift truck safety review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter's Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given

  4. Community Documentation Centre on Industrial Risk. Bulletin no. 8

    International Nuclear Information System (INIS)

    Masera, M.; Rasmussen, K.

    1993-01-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  5. Community Documentation Centre on Industrial Risk. Bulletin no. 4

    International Nuclear Information System (INIS)

    Gow, H.B.F.

    1991-01-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  6. Community Documentation Centre on Industrial Risk. Bulletin no. 10

    International Nuclear Information System (INIS)

    Perschke, A.; Kirchsteiger, C.

    1996-01-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  7. Community Documentation Centre on Industrial Risk. Bulletin no. 5

    International Nuclear Information System (INIS)

    Gow, H.B.F.

    1991-11-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  8. Community Documentation Centre on Industrial Risk. Bulletin no. 7

    International Nuclear Information System (INIS)

    Gow, H.B.F.; Carditello, I.

    1993-04-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  9. Community Documentation Centre on Industrial Risk. Bulletin no. 9

    International Nuclear Information System (INIS)

    Perschke, A.

    1995-01-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  10. Community Documentation Centre on Industrial Risk. Bulletin no. 6

    International Nuclear Information System (INIS)

    Gow, H.B.F.

    1992-06-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  11. Community Documentation Centre on Industrial Risk. Bulletin no. 11

    International Nuclear Information System (INIS)

    Perschke, A.; Kirchsteiger, C.; Carnevali, C.

    1997-01-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  12. Report of the IPERS (International Peer Review Service) review mission for the Cernavoda nuclear power plant probabilistic safety evaluation (CPSE -PHASE B) in Romania 3 to 14 July 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services review of the internal events Level 1 probabilistic safety assessment (PSA) for the Cernavoda, Unit 1 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. 7 refs, figs, tabs

  13. Periodic safety review of the experimental fast reactor JOYO. Review of the activity for safety

    International Nuclear Information System (INIS)

    Maeda, Yukimoto; Kashimura, Youichi; Suzuki, Toshiaki; Isozaki, Kazunori; Hoshiba, Hideaki; Kitamura, Ryoichi; Nakano, Tomoyuki; Takamatsu, Misao; Sekine, Takashi

    2005-02-01

    Periodic safety review (Review of the activity for safety) which consisted of 'Comprehensive evaluation of operation experience' and Incorporation of the latest technical knowledge' was carried out up to January 2005. 1. Comprehensive evaluation of operation experience. It was confirmed that the effectual activities for safety through the operation of JOYO were carried out in terms of (1) Operation management, (2) Maintenance management, (3) Fuel management, (4) Radiation management, (5) Radioactive waste management, (6) Emergency planning and (7) Feedback of incidents and failures. 2. Reflection of the latest technical knowledge. It was confirmed that the latest technical knowledge including regulation and guide line established by Nuclear Safety Commission of Japan until March 31st. 2003 were properly reflected in impressing the safety of the reactor. As a result, it was evaluated that the activity for safety was carried out effectually, and no additional measure was identified continual safe operation of the reactor. (author)

  14. Analysis of compatibility of current Czech initial documentation in the area of technical assurance of nuclear safety with the requirements of the EUR document

    International Nuclear Information System (INIS)

    Zdebor, J.; Zdebor, R.; Kratochvil, L.

    2001-11-01

    The publication is structured as follows: Description of existing documentation. General requirements, goals, principles and design principles: Documents being compared; Method of comparison; Results and partial evaluation of comparison of requirements between EUR and Czech regulations (basic goals and safety philosophy; quantitative safety objectives; basic design requirements; extended design requirements; external and internal threats; technical requirements; site conditions); Summary of the comparison of safety requirements. Comparison of requirements for the systems: Requirements for the nuclear reactor unit systems; Barrier systems (fuel system; reactor cooling system; containment system); Remaining systems (control systems; protection systems; coolant makeup and purification system; residual heat removal system; emergency cooling system; power systems); Common technical requirements for systems (technical requirements for systems; internal and external events). (P.A.)

  15. Review of domestic and international experience on optimization of tests planning for safety related systems at NPP

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Komarov, Yu.A.; Kolykanov, V.N.; Kochneva, V.Yu.; Gablaya, T.V.

    2009-01-01

    There are represented the basic requirements of normative and operating documents on test periodicity of safety related systems at NPPs, sets out the theoretical methods of test optimization of the technical systems, and analyses foreign engineering methods for changing test periodicity of the NPP systems. Based on this review analyses further tasks are formulated for improvement of the methodical base of optimization of tests planning for safety related systems

  16. 49 CFR 659.27 - Internal safety and security reviews.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Internal safety and security reviews. 659.27... State Oversight Agency § 659.27 Internal safety and security reviews. (a) The oversight agency shall... safety and security reviews in its system safety program plan. (b) The internal safety and security...

  17. Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)

    Science.gov (United States)

    Duarte, Alberto

    2007-01-01

    Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a

  18. THE FORMATION OF THE CONTOUR OF THE DOCUMENTED AND REAL FLIGHT SAFETY IN THE SYSTEM OF THE INFORMATION PROVISION OF SAFETY OF FLIGHTS

    Directory of Open Access Journals (Sweden)

    B. I. Bachkalo

    2015-01-01

    Full Text Available The article discusses the principles and mechanisms of formation of the contour of the real safety of flights and contour of the documented safety, allowing us to obtain information to control fligh safety. The proposed approach can be used in the algorithms of active on-board flight safety management system for the implementation of information support to the crew in flight and automatic control of flight safety.

  19. Development of Safety Review Guidance for Research and Training Reactors

    International Nuclear Information System (INIS)

    Oh, Kju-Myeng; Shin, Dae-Soo; Ahn, Sang-Kyu; Lee, Hoon-Joo

    2007-01-01

    The KINS already issued the safety review guidance for pressurized LWRs. But the safety review guidance for research and training reactors were not developed. So, the technical standard including safety review guidance for domestic research and training reactors has been applied mutates mutandis to those of nuclear power plants. It is often difficult for the staff to effectively perform the safety review of applications for the permit by the licensee, based on peculiar safety review guidance. The NRC and NSC provide the safety review guidance for test and research reactors and European countries refer to IAEA safety requirements and guides. The safety review guide (SRG) of research and training reactors was developed considering descriptions of the NUREG- 1537 Part 2, previous experiences of safety review and domestic regulations for related facilities. This study provided the safety review guidance for research and training reactors and surveyed the difference of major acceptance criteria or characteristics between the SRG of pressurized light water reactor and research and training reactors

  20. Model review and evaluation for application in DOE safety basis documentation of chemical accidents - modeling guidance for atmospheric dispersion and consequence assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lazaro, M. A. [Argonne National Lab. (ANL), Argonne, IL (United States); Woodarad, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Hanna, S. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Hesse, D. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Huang, J. -C. [Argonne National Lab. (ANL), Argonne, IL (United States); Lewis, J. [Argonne National Lab. (ANL), Argonne, IL (United States); Mazzola, C. A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    1997-09-01

    The U.S. Department of Energy (DOE), through its Defense Programs (DP), Office of Engineering and Operations Suppon, established the Accident Phenomenology and Consequence (AP AC) Methodology Evaluation Program to identify and evaluate methodologies and computer codes to support accident phenomenological and consequence calculations for both radiological and nonradiological materials at DOE facilities and to identify development needs. The program is also intended to define and recommend "best or good engineering/safety analysis practices" to be followed in preparing ''design or beyond design basis" assessments to be included in DOE nuclear and nonnuclear facility safety documents. The AP AC effort is intended to provide scientifically sound and more consistent analytical approaches, by identifying model selection procedures and application methodologies, in order to enhance safety analysis activities throughout the DOE complex.

  1. Computerising documentation

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The nuclear power generation industry is faced with public concern and government pressures over safety, efficiency and risk. Operators throughout the industry are addressing these issues with the aid of a new technology - technical document management systems (TDMS). Used for strategic and tactical advantage, the systems enable users to scan, archive, retrieve, store, edit, distribute worldwide and manage the huge volume of documentation (paper drawings, CAD data and film-based information) generated in building, maintaining and ensuring safety in the UK's power plants. The power generation industry has recognized that the management and modification of operation critical information is vital to the safety and efficiency of its power plants. Regulatory pressure from the Nuclear Installations Inspectorate (NII) to operate within strict safety margins or lose Site Licences has prompted the need for accurate, up-to-data documentation. A document capture and management retrieval system provides a powerful cost-effective solution, giving rapid access to documentation in a tightly controlled environment. The computerisation of documents and plans is discussed in this article. (Author)

  2. Development of safety review advisory system for nuclear power plants

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Park, W. J.; Lee, J. I.; Hur, K. Y.; Choi, S. S.; Lee, S. J.; Kang, C. M.

    2001-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application program was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they were investigated by the safety review experts at KINS. Safety Review Advisory System (SRAS), the windows application on client-server environment was developed according to the above specifications. Reviewers can do their safety reviewing regardless of speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into three groups, administrator, project manager, and reviewer. Each user group has appropriate access capability. The function and some screen shots of SRAS are described in this paper

  3. Conducting organizational safety reviews - requirements, methods and experience

    International Nuclear Information System (INIS)

    Reiman, T.; Oedewald, P.; Wahlstroem, B.; Rollenhagen, C.; Kahlbom, U.

    2008-03-01

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  4. Conducting organizational safety reviews - requirements, methods and experience

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, T.; Oedewald, P.; Wahlstroem, B. [Technical Research Centre of Finland, VTT (Finland); Rollenhagen, C. [Royal Institute of Technology, KTH, (Sweden); Kahlbom, U. [RiskPilot (Sweden)

    2008-03-15

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  5. Safety assessment of research reactors and preparation of the safety analysis report

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide presents guidelines, approved by international consensus, for the preparation, review and assessment of safety documentation for research reactors such as the Safety Analysis Report. While the Guide is most applicable to research reactors in the design and construction stage, it is also recommended for use during relicensing or reassessment of existing reactors

  6. Internal safety review team at Comanche Peak SES

    Energy Technology Data Exchange (ETDEWEB)

    Davis, D [Comanche Peak Steam Electric Staion, Texas Utilities, TX (United States)

    1997-09-01

    The presentations describes the following issues: levels of defense in depth; internal safety review organizations; methods used to perform safety assessment; safety committee review; quality verification; root cause analysis; human performance program; industry operating experience.

  7. Documented Safety Analysis for the Waste Storage Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Laycak, D

    2008-06-16

    This documented safety analysis (DSA) for the Waste Storage Facilities was developed in accordance with 10 CFR 830, Subpart B, 'Safety Basis Requirements', and utilizes the methodology outlined in DOE-STD-3009-94, Change Notice 3. The Waste Storage Facilities consist of Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area portion of the DWTF complex. These two areas are combined into a single DSA, as their functions as storage for radioactive and hazardous waste are essentially identical. The B695 Segment of DWTF is addressed under a separate DSA. This DSA provides a description of the Waste Storage Facilities and the operations conducted therein; identification of hazards; analyses of the hazards, including inventories, bounding releases, consequences, and conclusions; and programmatic elements that describe the current capacity for safe operations. The mission of the Waste Storage Facilities is to safely handle, store, and treat hazardous waste, transuranic (TRU) waste, low-level waste (LLW), mixed waste, combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL (as well as small amounts from other DOE facilities).

  8. Nuclear safety review for 1984

    International Nuclear Information System (INIS)

    1985-08-01

    This publication is based on the fourth Nuclear Safety Review prepared by the IAEA Secretariat for presentation to the Board of Governors. It discusses relevant international activities in 1984 and the current status of nuclear safety and radiation protection, and looks ahead to anticipated developments

  9. Engineering design guidelines for nuclear criticality safety

    International Nuclear Information System (INIS)

    Waltz, W.R.

    1988-08-01

    This document provides general engineering design guidelines specific to nuclear criticality safety for a facility where the potential for a criticality accident exists. The guide is applicable to the design of new SRP/SRL facilities and to major modifications Of existing facilities. The document is intended an: A guide for persons actively engaged in the design process. A resource document for persons charged with design review for adequacy relative to criticality safety. A resource document for facility operating personnel. The guide defines six basic criticality safety design objectives and provides information to assist in accomplishing each objective. The guide in intended to supplement the design requirements relating to criticality safety contained in applicable Department of Energy (DOE) documents. The scope of the guide is limited to engineering design guidelines associated with criticality safety and does not include other areas of the design process, such as: criticality safety analytical methods and modeling, nor requirements for control of the design process

  10. Operating experience and systems analysis at Trillo NPP: A program intended for systematic review of plant safety systems to assess design basis requirements compliance

    International Nuclear Information System (INIS)

    Vega, R. de la

    1996-01-01

    The program was defined to apply to all plant safety systems and/or systems included in plant Technical Specifications. The goal of the program was to ensure, by systematic design, construction, and commissioning review, the adequacy of safety systems, structures and components to fulfill their safety functions. Also, as a result of the program, it was established that a complete, unambiguous, systematic, design basis definition shall take place. And finally, a complete documental review of the plant design shall result from the program execution

  11. Internet Safety and Security Surveys - A Review

    DEFF Research Database (Denmark)

    Sharp, Robin

    This report gives a review of investigations into Internet safety and security over the last 10 years. The review covers a number of surveys of Internet usage, of Internet security in general, and of Internet users' awareness of issues related to safety and security. The focus and approach...... of the various surveys is considered, and is related to more general proposals for investigating the issues involved. A variety of proposals for how to improve levels of Internet safety and security are also described, and they are reviewed in the light of studies of motivational factors which affect the degree...

  12. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapter 1, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  13. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed.

  14. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    International Nuclear Information System (INIS)

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed

  15. The Interagency Nuclear Safety Review Panel's Galileo safety evaluation report

    International Nuclear Information System (INIS)

    Nelson, R.C.; Gray, L.B.; Huff, D.A.

    1989-01-01

    The safety evaluation report (SER) for Galileo was prepared by the Interagency Nuclear Safety Review Panel (INSRP) coordinators in accordance with Presidential directive/National Security Council memorandum 25. The INSRP consists of three coordinators appointed by their respective agencies, the Department of Defense, the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA). These individuals are independent of the program being evaluated and depend on independent experts drawn from the national technical community to serve on the five INSRP subpanels. The Galileo SER is based on input provided by the NASA Galileo Program Office, review and assessment of the final safety analysis report prepared by the Office of Special Applications of the DOE under a memorandum of understanding between NASA and the DOE, as well as other related data and analyses. The SER was prepared for use by the agencies and the Office of Science and Technology Policy, Executive Office of the Present for use in their launch decision-making process. Although more than 20 nuclear-powered space missions have been previously reviewed via the INSRP process, the Galileo review constituted the first review of a nuclear power source associated with launch aboard the Space Transportation System

  16. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    Energy Technology Data Exchange (ETDEWEB)

    Chopra, Omesh K. [Argonne National Lab., IL (United States). Environmental Science Division; Diercks, Dwight R. [Argonne National Lab., IL (United States). Nuclear Engineering Division; Ma, David Chia-Chiun [Argonne National Lab., IL (United States). Environmental Science Division; Garud, Yogendra S. [Argonne National Lab., IL (United States). Environmental Science Division

    2013-12-17

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes. In the U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978

  17. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    International Nuclear Information System (INIS)

    Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun; Garud, Yogendra S.

    2013-01-01

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC's assessment processes. In the U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978 and

  18. Evolution of International Space Station Program Safety Review Processes and Tools

    Science.gov (United States)

    Ratterman, Christian D.; Green, Collin; Guibert, Matt R.; McCracken, Kristle I.; Sang, Anthony C.; Sharpe, Matthew D.; Tollinger, Irene V.

    2013-01-01

    the new ISS hazard system utilized focused user research and iterative design methods employed by the Human Computer Interaction Group at NASA Ames Research Center. Particularly, the approach emphasized the reduction of workload associated with document and data management activities so more resources can be allocated to the operational use of data in problem solving, safety analysis, and recurrence control. The methods and techniques used to understand existing processes and systems, to recognize opportunities for improvement, and to design and review improvements are described with the intent that similar techniques can be employed elsewhere in safety operations. A second goal of this paper is to provide and overview of the web-based data system implemented by ISS. The software selected for the ISS hazard systemMission Assurance System (MAS)is a NASA-customized vairant of the open source software project Bugzilla. The origin and history of MAS as a NASA software project and the rationale for (and advantages of) using open-source software are documented elsewhere (Green, et al., 2009).

  19. Nuclear safety review for qualification of class 1E motor inside containment for nuclear power stations

    International Nuclear Information System (INIS)

    Li Shixin; Wu Qi; Zhang Yunbo; Wu Caixia

    2013-01-01

    In nuclear power plants with pressurized water reactors, the review for class 1E motor inside containment qualification process and documents is an important aspect of nuclear safety equipment review, and the reviewers should make evaluations for the qualification test results in terms of the compliance with standard and regulation, and the consistency with inside containment environment. Firstly, this paper introduces the qualification test of class 1E motor inside containment for nuclear power generating stations, such as aging test and design-basis-event test. Second, there is a discussion about typical problems of review. At last, comparison of IEEE334 with RCC-E is conducted and explored. (authors)

  20. Review of SKB's Safety Assessment SR-Can: Contributions in Support of SKI's and SSI's Review by External Consultants

    Energy Technology Data Exchange (ETDEWEB)

    2008-03-15

    The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear fuel in Sweden 2010. In support of this application SKB will present a safety report, SR-Site, on the repository's long-term safety and radiological consequences. As a preparation for SR-Site, SKB published the preliminary safety assessment SR-Can in November 2006. The purposes were to document a first evaluation of long-term safety for the two candidate sites at Forsmark and Laxemar and to provide feedback to SKB's future programme of work. An important objective of the authorities' review of SR-Can is to provide guidance to SKB on the complete safety reporting for the license application. The authorities have engaged external experts for independent modelling, analysis and review, with the aim to provide a range of expert opinions related to the sufficiency and appropriateness of various aspects of SR-Can. The conclusions and judgments in this report are those of the authors and may not necessarily coincide with those of SKI and SSI. The authorities own review will be published separately (SKI Report 2008:23, SSI Report 2008:04 E). This report compiles contributions from several specific research projects. The separate reviews cover topics regarding the engineered barrier system, the quality assurance, the climate evolution and its effects, and the ecosystems and environmental impacts. All contributions are in English apart from the review concerning ecosystems and environmental impacts, which is presented in Swedish

  1. The Role of Documentation Quality in Anesthesia-Related Closed Claims: A Descriptive Qualitative Study.

    Science.gov (United States)

    Wilbanks, Bryan A; Geisz-Everson, Marjorie; Boust, Rebecca R

    2016-09-01

    Clinical documentation is a critical tool in supporting care provided to patients. Sound documentation provides a picture of clinical events that can be used to improve patient care. However, many other uses for clinical documentation are equally important. Such documentation informs clinical decision support tools, creates a legal record of patient care, assists in financial reimbursement of services, and serves as a repository for secondary data analysis. Conversely, poor documentation can impair patient safety and increase malpractice risk exposure by reflecting poor or inaccurate information that ultimately may guide patient care decisions.Through an examination of anesthesia-related closed claims, a descriptive qualitative study emerged, which explored the antecedents and consequences of documentation quality in the claims reviewed. A secondary data analysis utilized a database generated by the American Association of Nurse Anesthetists Foundation closed claim review team. Four major themes emerged from the analysis. Themes 1, 2, and 4 primarily describe how poor documentation quality can have negative consequences for clinicians. The third theme primarily describes how poor documentation quality that can negatively affect patient safety.

  2. Periodic safety review of the experimental fast reactor JOYO. Review of aging management

    International Nuclear Information System (INIS)

    Isozaki, Kazunori; Ogawa, To-ru; Nishino, Kazunari

    2005-05-01

    Periodic safety review (Review of the aging management) which consisted of ''Technical review on aging for the safety related structures, systems and components'' and ''Establishment a long term maintenance program'' was carried out up to April 2005. 1. Technical review on aging for the safety related structures, systems and components. It was technically confirmed to prevent the loss of function of the safety related structures, systems and components due to aging phenomena, which (1) irradiation damage, (2) corrosion, (3) abrasion and erosion, (4) thermal aging, (5) creep and fatigue, (6) Stress Corrosion Cracking, (7) insulation deterioration and (8) general deterioration, under the periodic monitoring or renewal of them. 2. Establishment of long term maintenance program. The long term maintenance during JFY2005 to 2014 were established based on the technical review on aging for the safety related structures, systems and components. It was evaluated that the inspection and renewal based on the long term maintenance program, in addition to the spontaneous inspection of the long term voluntary long-term inspection plan, could prevent the loss of function of the safety related structures, systems and components. (author)

  3. International Review Team (IRT) Safety Case Recommendations for the Yucca Mountain Total System Performance Assessment (TSPA) Supporting the Site Recommendation

    International Nuclear Information System (INIS)

    Van Luik, Abraham E.

    2004-01-01

    The session started with Abe Van Luik (IGSC Chair, US-DOE-YM, USA) who presented the feedback of the international peer review of the US-DOE Yucca Mountain TSPA (Total System Performance Assessment) supporting the successful designation of the site by the Congress and the President of the U.S. In particular, he listed key implications of the IRT (International Review team) recommendations on the forthcoming US-DOE documentation of its case for safety to be submitted to the regulator, the U.S. Nuclear Regulatory Commission, mainly: - The documentation submitted to the licensing authority should address technical aspects and compliance with regulatory criteria. - That documentation should reflect sound science and good engineering practice; it should present detailed and rigorous modelling. - In addition, it should present both quantitative and qualitative arguments, make a statement on why there can be confidence in the face of uncertainty, acknowledge remaining issues and provide the strategy to resolve them. - Demonstrating understanding is as important as demonstrating compliance. - There is a need to provide a clear explanation of the case made to the regulator for more general audiences to complement the large amount of technical documents that will be produced. The US-DOE response to these recommendations for the License Application, which is under preparation, is that the recommendations will be implemented to the maximum extent possible. In subsequent discussion, with respect to the License Application, it was acknowledged that detailed guidance from the U.S. regulator was very useful, and guidance of this type would be generally useful. At the current time, the words 'safety case' are not mentioned in U.S. regulations, but if one reads both the regulation and guidance documents it becomes evident that all aspects of a safety case need to be provided in the License Application and its accompanying documents

  4. Nuclear safety in Slovak Republic. Safety analysis reports for WWER 440 reactors

    International Nuclear Information System (INIS)

    Rohar, S.

    1999-01-01

    Implementation of nuclear power program is connected to establishment of regulatory body for safe regulation of siting, construction, operation and decommissioning of nuclear installations. Licensing being one of the most important regulatory surveillance activity is based on independent regulatory review and assessment of information on nuclear safety for particular nuclear facility. Documents required to be submitted to the regulatory body by the licensee in Slovakia for the review and assessment usually named Safety Analysis Report (SAR) are presented in detail in this paper. Current status of Safety Analysis Reports for Bohunice V-1, Bohunice V-2 and Mochovce NPP is shown

  5. Safety Design Criteria of Indian Sodium Cooled Fast Reactors

    International Nuclear Information System (INIS)

    Pillai, P.; Chellapandi, P.; Chetal, S.C.; Vasudeva Rao, P.R.

    2013-01-01

    • Important feedback has been gained through the design and safety review of PFBR. • The safety criteria document prepared by AERB and IGCAR would provide important input to prepare the dedicated document for the Sodium cooled Fast Reactors at the national and international level. • A common approach with regard to safety, among countries pursuing fast reactor program, is desirable. • Sharing knowledge and experimental facilities on collaborative basis. • Evolution of strong safety criteria – fundamental to assure safety

  6. SKI's and SSI's joint review of SKB's safety assessment report, SR 97. Summary

    International Nuclear Information System (INIS)

    2001-01-01

    The Swedish Nuclear Fuel and Waste Management Co (SKB) has a programme for the siting of a repository for spent nuclear fuel in Swedish bedrock. In 1996, the Swedish Government decided that SKB must perform an assessment of the repository's long-term safety before undertaking the next step of the programme which entails drilling in a minimum of two municipalities (site investigations). SKB has presented such a safety assessment in SR 97 Post-closure Safety (henceforth referred to as SR 97). SR 97 is one of the documents in the comprehensive reporting that SKB must provide when it proposes sites for investigation. The Swedish Nuclear Power Inspectorate (SKI) and the Swedish Radiation Protection Institute (SSI) have evaluated SR 97 in terms of its purposes which are to demonstrate a methodology for safety assessment, to show that Swedish bedrock can provide a safe repository using SKB's method, to provide a basis for specifying the factors that are important for site selection and to derive preliminary requirements on the function of the engineered barriers. The authorities have reached the following conclusions: SR 97 does not indicate any conditions that would mean that geological final disposal in accordance with SKB's method would have significant deficiencies in relation to the safety and radiation protection requirements of the authorities. SR 97 contains the elements required for a comprehensive assessment of safety and radiation protection. SKB's safety assessment methodology has improved within several important areas, such as the documentation of processes and properties that can affect repository performance and the development of models for safety assessment calculations. The methodology used in SR 97 has some deficiencies, for example, the specification of future events to be described in the safety assessment. SR 97 has not, to an adequate extent, dealt with unfavourable conditions that can affect the future safety of a repository. SKB states that the

  7. Activity of safety review for the facilities using nuclear material (2). Safety review results and maintenance experiences for hot laboratories

    International Nuclear Information System (INIS)

    Amagai, Tomio; Fujishima, Tadatsune; Mizukoshi, Yasutaka; Sakamoto, Naoki; Ohmori, Tsuyoshi

    2009-01-01

    In the site of O-arai Research and Development Center of Japan Atomic Energy Agency (JAEA), five hot laboratories for post-irradiation examination and development of plutonium fuels are operated more than 30 years. A safety review method for preventive maintenance on these hot laboratories includes test facilities and devices are established in 2003. After that, the safety review of these facilities and devices are done and taken the necessary maintenance based on the results in each year. In 2008, 372 test facilities and devices in these hot laboratories were checked and reviewed by this method. As a results of the safety review, repair issues of 38 facilities of above 372 facilities were resolved. This report shows the review results and maintenance experiences based on the results. (author)

  8. International Expert Team Concludes IAEA Peer Review of Poland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    the development of the nuclear power programme; and PAA's proactive approach to coordination with Poland's Office of Technical Inspection. The IRRS team made several recommendations and suggestions for PAA as it grows in the next few years, facing challenges and increasing demands as its nuclear power programme expands. To position PAA to address its growth, additional responsibilities, and the retirement of many senior managers, and to maintain its strong focus on safety for currently regulated facilities and activities, the IRRS team advised PAA to: Establish and frequently review that there is a clear link between PAA's organizational goals and objectives, and resource planning, such as staffing and strategies for external support; Consider strengthening and documenting PAA's management system; and Develop and strengthen internal guidance to document authorization processes, review, assessment and inspection procedures. In its preliminary report, the IAEA team's main conclusions have been conveyed to PAA. A final report will be submitted to the Government of Poland in about three months. PAA has informed the team that the final report will be made publicly available. The IAEA encourages nations to invite a follow-up IRRS mission about two years after the mission has been completed. Background The team reviewed the legal and regulatory framework for nuclear safety and addressed all facilities regulated by PAA. This was the 46th IRRS mission conducted by the IAEA. About IRRS Missions IRRS missions are designed to strengthen and enhance the effectiveness of the national nuclear regulatory infrastructure of States, while recognizing the ultimate responsibility of each State to ensure safety in this area. This is done through consideration of regulatory, technical and policy issues, with comparisons against IAEA safety standards and, where appropriate, good practices elsewhere. (IAEA)

  9. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapters 2-13, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  10. Lessons learned from the Galileo and Ulysses flight safety review experience

    International Nuclear Information System (INIS)

    Bennett, Gary L.

    1998-01-01

    In preparation for the launches of the Galileo and Ulysses spacecraft, a very comprehensive aerospace nuclear safety program and flight safety review were conducted. A review of this work has highlighted a number of important lessons which should be considered in the safety analysis and review of future space nuclear systems. These lessons have been grouped into six general categories: (1) establishment of the purpose, objectives and scope of the safety process; (2) establishment of charters defining the roles of the various participants; (3) provision of adequate resources; (4) provision of timely peer-reviewed information to support the safety program; (5) establishment of general ground rules for the safety review; and (6) agreement on the kinds of information to be provided from the safety review process

  11. Nuclear Safety

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1989-01-01

    This document is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  12. Safety evaluation review of the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  13. Periodic Safety Review of Nuclear Power Plants: Experience of Member States

    International Nuclear Information System (INIS)

    2010-04-01

    Routine reviews of nuclear power plant operation (including modifications to hardware and procedures, operating experience, plant management and personnel competence) and special reviews following major events of safety significance are the primary means of safety verification. In addition, many Member States of the IAEA have initiated systematic safety reassessments, termed periodic safety reviews, of nuclear power plants, to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments and siting aspects. The reviews include an assessment of plant design and operation against current safety standards and practices, and they have the objective of ensuring a high level of safety throughout the plant's operating lifetime. They are complementary to the routine and special safety reviews and do not replace them. Periodic safety reviews of nuclear power plants are considered an effective way to obtain an overall view of actual plant safety, and to determine reasonable and practical modifications that should be made in order to maintain a high level of safety. They can be used as a means of identifying time limiting features of the plant in order to determine nuclear power plant operation beyond the designed lifetime. The periodic safety review process can be used to support the decision making process for long term operation or licence renewal. Since 1994, the use of periodic safety reviews by Member States has substantially broadened and confirmed its benefits. Periodic safety review results have, for example, been used by some Member States to help provide a basis for continued operation beyond the current licence term, to communicate more effectively with stakeholders regarding nuclear power plant safety, and to help identify changes to plant operation that enhance safety. This IAEA-TECDOC is intended to assist Member States in the implementation of a periodic safety review. This publication complements the

  14. Safety of RBMK reactors: Setting the technical framework

    International Nuclear Information System (INIS)

    Lederman, L.

    1996-01-01

    This article reviews major efforts for improving the safety of RBMK reactors through a co-operative IAEA programme initiated in 1992. Specifically covered are technical findings of safety reviews related to the design and operation of the plants, and the documentation of findings through an Agency database intended to facilitate the technical co-ordination of ongoing national and international efforts for improving RBMK safety

  15. The second periodic safety review report of Tokai Reprocessing Plant [JAEA-Technology--2016-007-PT1

    International Nuclear Information System (INIS)

    Shirai, Nobutoshi; Miura, Yasushi; Tachibana, Ikuya; Omori, Satoru; Wake, Junichi; Fukuda, Kazuhito; Nakano, Takafumi; Nagasato, Yoshihiko

    2016-07-01

    The periodic safety review of Tokai Reprocessing Plant (TRP) is an activity to confirm the application of the safety activity implementation and to give effective additional measures for the facility safety and the improvement of its reliability. We implemented 4 items as follows; (1) evaluation of safety activity implementation, (2) evaluation of status of safety activities reflecting the latest technical knowledges, (3) technical evaluation about aging degradation, and (4) planning measures about a 10-years-plan that the operator shall implement in order to keep the facility condition. We summarized this report as the result of research and evaluation of above 4 items as the second periodic safety review at TRP. About (1), we researched about the 8 items that are QA activities, operation management, maintenance management, etc. We confirmed the result that we are adequately expanding its safety activities by preparing the necessary documents and schemes, and so on. About (2), we researched them in view point of safety research results and technology development results and confirmed that we reflect latest knowledges into our facility and make efforts for improvement of safety and reliability. About (3), we can keep the safety of the facilities important to safety and the sea discharge line, under assumption of the present maintenance till the next aging evaluation, because no 'focuses for aging degradation' exist which we cannot deny the gap between the initial prediction and actual condition, by measurements and technical view. About (4), by the technical results of aging degradation evaluation, we found no additional safety plans into maintenance strategies. (author)

  16. Probabilistic safety criteria at the safety function/system level

    International Nuclear Information System (INIS)

    1989-09-01

    A Technical Committee Meeting was held in Vienna, Austria, from 26-30 January 1987. The objectives of the meeting were: to review the national developments of PSC at the level of safety functions/systems including future trends; to analyse basic principles, assumptions, and objectives; to compare numerical values and the rationale for choosing them; to compile the experience with use of such PSC; to analyse the role of uncertainties in particular regarding procedures for showing compliance. The general objective of establishing PSC at the level of safety functions/systems is to provide a pragmatic tool to evaluate plant safety which is placing emphasis on the prevention principle. Such criteria could thus lead to a better understanding of the importance to safety of the various functions which have to be performed to ensure the safety of the plant, and the engineering means of performing these functions. They would reflect the state-of-the-art in modern PSAs and could contribute to a balance in system design. This report, prepared by the participants of the meeting, reviews the current status and future trends in the field and should assist Member States in developing their national approaches. The draft of this document was also submitted to INSAG to be considered in its work to prepare a document on safety principles for nuclear power plants. Five papers presented at the meeting are also included in this publication. A separate abstract was prepared for each of these papers. Refs, figs and tabs

  17. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Maskin, Mazleha [Korea Advanced Institute for Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  18. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    International Nuclear Information System (INIS)

    Maskin, Mazleha; Choi, Kwang Sik

    2010-01-01

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  19. Workplace training for senior trainees: a systematic review and narrative synthesis of current approaches to promote patient safety.

    Science.gov (United States)

    Walton, Merrilyn; Harrison, Reema; Burgess, Annette; Foster, Kirsty

    2015-10-01

    Preventable harm is one of the top six health problems in the developed world. Developing patient safety skills and knowledge among advanced trainee doctors is critical. Clinical supervision is the main form of training for advanced trainees. The use of supervision to develop patient safety competence has not been established. To establish the use of clinical supervision and other workplace training to develop non-technical patient safety competency in advanced trainee doctors. Keywords, synonyms and subject headings were used to search eight electronic databases in addition to hand-searching of relevant journals up to 1 March 2014. Titles and abstracts of retrieved publications were screened by two reviewers and checked by a third. Full-text articles were screened against the eligibility criteria. Data on design, methods and key findings were extracted. Clinical supervision documents were assessed against components common to established patient safety frameworks. Findings from the reviewed articles and document analysis were collated in a narrative synthesis. Clinical supervision is not identified as an avenue for embedding patient safety skills in the workplace and is consequently not evaluated as a method to teach trainees these skills. Workplace training in non-technical patient safety skills is limited, but one-off training courses are sometimes used. Clinical supervision is the primary avenue for learning in postgraduate medical education but the most overlooked in the context of patient safety learning. The widespread implementation of short courses is not matched by evidence of rigorous evaluation. Supporting supervisors to identify teaching moments during supervision and to give weight to non-technical skills and technical skills equally is critical. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Topical session proceedings of the 5. IGSC meeting on: observations regarding the safety case in recent safety assessment studies

    International Nuclear Information System (INIS)

    Hooper, Alan J.; Voinis, Sylvie; Van Luik, Abraham E.

    2004-01-01

    Within the NEA, the IGSC (Integration Group for the Safety Case) has, as an essential role, to develop common views on such key aspects of the safety case. Therefore, since the inauguration of the IGSC in 2000, four meetings were organised with topical sessions to explore various of these key aspects. This is a report on the fifth such topical session, held as part of the 5. plenary meeting of the IGSC. The session was attended by 36 participants, representing waste management organisations and regulatory authorities from 16 NEA member countries, the IAEA and the European Commission. The purpose of this topical session was to provide support to the finalising of the IGSC safety case brochure by getting a description of the safety case content of the IAEA Draft Safety Requirements document and by getting an overview of progress that could be observed from national organisations on developing their cases for system safety and/or developing the required methodologies. The objective was that the IGSC safety case brochure should be supportive of the IAEA/NEA document, and be reflective of the experience of the IGSC member programmes and organisations. The topical session was mainly aimed at exchanging information on: - The safety case related content of the proposed IAEA/NEA document (currently titled: 'IAEA Safety Standards Series, Geological Disposal of Radioactive Waste, Draft Safety Requirements (DS-154)'). - National programmes where safety assessments have recently been completed, e.g. ONDRAF/NIRAS, Nagra and Andra. - Feedback from international peer reviews, e.g. the Andra Dossier 2001 Argile, the Belgian SAFIR 2 report, the SR 97 report and the US-DOE Yucca Mountain TSPA. - The evolution of some national assessment methods and approaches e.g. SKB and Nagra. - The content of the draft IGSC safety case brochure entitled: 'The Nature and Purpose of the Post-closure Safety Case in Geological Disposal'. This document presents the various

  1. 49 CFR 659.29 - Oversight agency safety and security reviews.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Oversight agency safety and security reviews. 659... Role of the State Oversight Agency § 659.29 Oversight agency safety and security reviews. At least... safety program plan and system security plan. Alternatively, the on-site review may be conducted in an on...

  2. Chyawanprash: A review of therapeutic benefits as in authoritative texts and documented clinical literature.

    Science.gov (United States)

    Narayana, D B Anantha; Durg, Sharanbasappa; Manohar, P Ram; Mahapatra, Anita; Aramya, A R

    2017-02-02

    Chyawanprash (CP), a traditional immune booster recipe, has a long history of ethnic origin, development, household preparation and usage. There are even mythological stories about the origin of this recipe including its nomenclature. In the last six decades, CP, because of entrepreneurial actions of some research Vaidyas (traditional doctors) has grown to industrial production and marketing in packed forms to a large number of consumers/patients like any food or health care product. Currently, CP has acquired a large accepted user base in India and in a few countries out-side India. Authoritative texts, recognized by the Drugs and Cosmetics Act of India, describe CP as an immunity enhancer and strength giver meant for improving lung functions in diseases with compromised immunity. This review focuses on published clinical efficacy and safety studies of CP for correlation with health benefits as documented in the authoritative texts, and also briefs on its recipes and processes. Authoritative texts were searched for recipes, processes, and other technical details of CP. Labels of marketing CP products (Indian) were studied for the health claims. Electronic search for studies of CP on efficacy and safety data were performed in PubMed/MEDLINE and DHARA (Digital Helpline for Ayurveda Research Articles), and Ayurvedic books were also searched for clinical studies. The documented clinical studies from electronic databases and Ayurvedic books evidenced that individuals who consume CP regularly for a definite period of time showed improvement in overall health status and immunity. However, most of the clinical studies in this review are of smaller sample size and short duration. Further, limitation to access and review significant data on traditional products like CP in electronic databases was noted. Randomized controlled trials of high quality with larger sample size and longer follow-up are needed to have significant evidence on the clinical use of CP as immunity

  3. Safety codes and guides for nuclear power plants

    International Nuclear Information System (INIS)

    Iansiti, E.

    1976-01-01

    The Codes of Practice and Safety Guides that are being developed by the International Atomic Energy Agency are divided in five topical areas: Governmental Organization, Siting, Design, Operation and Quality Assurance. In each area, a scientific secretary is responsible for developing the documents and five Technical Review Committees composed of 10 to 12 experts from various Members Countries revise the drafts at different stages. A Senior Advisory Group supervises the entire programme and revises the document. A scientific co-ordinator is responsible for the co-ordination within the programme with other sections of the IAEA, and with other international organizations. In preparing a document, information on the practice adopted by Member States is collected, a group of experts is convened for preparing a preliminary draft on the basis of this material and the draft is then reviewed by the appropriate Technical Review Committee. The document is translated into various languages, reviewed by the Senior Advisory Group and sent to Member States for comments. After the comments of Member States have been received, the Technical Review Committee and then the Senior Advisory Group are convened again for the final revision of the document. Some 25 drafts, are in different stages of development. The preparation of a document in its final form takes about two years. The programme started in 1975 and to date most of the safety codes and a few safety guides have been sent to Member States for comments. These documents will have gone through the entire development procedure by early 1977. The Senior Advisory Groups and the Technical Review Committees meet on the average four times a year for a week at a time. Until now these meetings have been mainly concerned with the development of new documents or with that part of the procedure which precedes the transmission of the draft to Member States for comments. The next series of meetings will deal with the revisions needed to

  4. Systematic evaluation program review of NRC Safety Topic VI-10.A associated with the electrical, instrumentation and control portions of the testing of reactor trip system and engineered safety features, including response time for the Dresden station, Unit II nuclear power plant

    International Nuclear Information System (INIS)

    St Leger-Barter, G.

    1980-11-01

    This report documents the technical evaluation and review of NRC Safety Topic VI-10.A, associated with the electrical, instrumentation, and control portions of the testing of reactor trip systems and engineered safety features including response time for the Dresden II nuclear power plant, using current licensing criteria

  5. New IAEA guidance on safety culture

    International Nuclear Information System (INIS)

    Haage, Monica; )

    2012-01-01

    Monica Haage described a project for Kozloduy Nuclear Power Plant in Bulgaria which was also funded by the Norwegian government. This project included the development of guidance documents and training on self-assessment and continuous improvement of safety culture. A draft IAEA safety culture survey was also developed as part of this project in collaboration with St Mary's University, Canada. This project was conducted in parallel with an IAEA project to develop new safety reports on safety culture self-assessment and continuous improvement. A safety report on safety culture during the pre-operational phases of NPPs has also been drafted. The IAEA approach to safety culture assessment was outlined and core principles of the approach were discussed. These include the use of several assessment methods (survey, interview, observation, focus groups, document review), and two distinct levels of analysis. The first is a descriptive analysis of the observed cultural characteristics from each assessment method and overarching themes. This is followed by a 'normative' analysis comparing what has been observed with the desirable characteristics of a strong, positive, safety culture, as defined by the IAEA safety culture framework. The application of this approach during recent Operational Safety Assessment Review Team (OSART) missions was described along with key learning points

  6. Setting clear expectations for safety basis development

    International Nuclear Information System (INIS)

    MORENO, M.R.

    2003-01-01

    DOE-RL has set clear expectations for a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (10 CFR 830, Nuclear Safety Rule) which will ensure long-term benefit to Hanford. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development resulting in a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was issued to standardized methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was issued for the evaluation of radiological consequences for accident scenarios often postulated for Hanford. A standard Site Documented Safety Analysis (DSA) detailing the safety management programs was issued for use as a means of compliance with a majority of 3009 Standard chapters. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. As a result of setting expectations and providing safety analysis tools, the four Hanford Site waste management nuclear facilities were able to integrate into one Master Waste Management Documented Safety Analysis (WM-DSA)

  7. The practical implementation of integrated safety management for nuclear safety analysis and fire hazards analysis documentation

    International Nuclear Information System (INIS)

    COLLOPY, M.T.

    1999-01-01

    the integrated safety management system approach for having a uniform and consistent process: a method has been suggested by the U S . Department of Energy at Richland and the Project Hanford Procedures when fire hazard analyses and safety analyses are required. This process provides for a common basis approach in the development of the fire hazard analysis and the safety analysis. This process permits the preparers of both documents to jointly participate in the development of the hazard analysis process. This paper presents this method to implement the integrated safety management approach in the development of the fire hazard analysis and safety analysis that provides consistency of assumptions. consequences, design considerations, and other controls necessarily to protect workers, the public. and the environment

  8. Usability and Safety in Electronic Medical Records Interface Design: A Review of Recent Literature and Guideline Formulation.

    Science.gov (United States)

    Zahabi, Maryam; Kaber, David B; Swangnetr, Manida

    2015-08-01

    The objectives of this study were to (a) review electronic medical record (EMR) and related electronic health record (EHR) interface usability issues, (b) review how EMRs have been evaluated with safety analysis techniques along with any hazard recognition, and (c) formulate design guidelines and a concept for enhanced EMR interfaces with a focus on diagnosis and documentation processes. A major impact of information technology in health care has been the introduction of EMRs. Although numerous studies indicate use of EMRs to increase health care quality, there remain concerns with usability issues and safety. A literature search was conducted using Compendex, PubMed, CINAHL, and Web of Science databases to find EMR research published since 2000. Inclusion criteria included relevant English-language papers with subsets of keywords and any studies (manually) identified with a focus on EMR usability. Fifty studies met the inclusion criteria. Results revealed EMR and EHR usability problems to include violations of natural dialog, control consistency, effective use of language, effective information presentation, and customization principles as well as a lack of error prevention, minimization of cognitive load, and feedback. Studies focusing on EMR system safety made no objective assessments and applied only inductive reasoning methods for hazard recognition. On the basis of the identified usability problems and structure of safety analysis techniques, we provide EMR design guidelines and a design concept focused on the diagnosis process and documentation. The design guidelines and new interface concept can be used for prototyping and testing enhanced EMRs. © 2015, Human Factors and Ergonomics Society.

  9. Improved safety at CERN

    CERN Multimedia

    2006-01-01

    As announced in Weekly Bulletin No. 43/2006, a new approach to the implementation of Safety at CERN has been decided, which required taking some managerial decisions. The guidelines of the new approach are described in the document 'New approach to Safety implementation at CERN', which also summarizes the main managerial decisions I have taken to strengthen compliance with the CERN Safety policy and Rules. To this end I have also reviewed the mandates of the Safety Commission and the Safety Policy Committee (SAPOCO). Some details of the document 'Safety Policy at CERN' (also known as SAPOCO42) have been modified accordingly; its essential principles, unchanged, remain the basis for the safety policy of the Organisation. I would also like to inform you that I have appointed Dr M. Bona as the new Head of the Safety Commission until 31.12.2008, and that I will proceed soon to the appointment of the members of the new Safety Policy Committee. All members of the personnel are deemed to have taken note of the d...

  10. Nuclear safety review for the year 1997

    International Nuclear Information System (INIS)

    1998-12-01

    The Nuclear Safety Review attempts to summarize the global nuclear safety scene during 1997. It starts with discussion of significant safety related events worldwide: International cooperation; reactor facilities; radioactive waste management; medical uses of radiation sources; events at other facilities and transport of radioactive material. This is followed by a description of principal IAEA activities that contributed to global nuclear safety, namely: legally binding international agreements; non-binding safety standards and their application. The third part highlights developments in Member States as they reported them. The review closes with a description of issues that are likely to be prominent in the coming year(s). A draft version was submitted to the March 1998 session of the IAEA Board of Governors, and this final version has been prepared in light of the discussion in the Board and was submitted for information to the 42nd session of the IAEA General Conference

  11. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan; Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report

  12. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed.

  13. SSI and SKI's Review of SKB's Updated Final Safety Report for SFR 1. Review Report

    International Nuclear Information System (INIS)

    2003-10-01

    previous safety assessments for SFR 1. The review committee particularly emphasises the high quality of the site-specific description prepared for the biosphere and biosphere evolution. Significant progress has also been made with respect to the basis for analyses of the inventory of radioactive substances and model descriptions for hydrogeology and near field transport. The safety assessment has also been updated with a modern system description and database for FEPs (features, events and processes). The requirements made on a repository and on the content and presentation of a safety report have been stipulated in the form of new regulations since permission was granted for the operation of SFR 1. The regulations stipulate that the consequences of radioactive releases are to be evaluated in relation to a risk criterion and that environmental impact must also be reported. In connection with the evaluation of SKB's new safety assessment, the authorities identified certain deviations in relation to the requirements of the new regulations. A significant deviation is that SSR 2001 lacks a thorough analysis which shows the impact of identified uncertainties on calculated future consequences. There are also deficiencies in the documentation which make it difficult to reproduce or judge the suitability of certain models and data, e.g. for the near field and biosphere. Confidence in SKB's risk assessment is also limited by the lack of clarity of the scenario descriptions. Furthermore, SKB has not convincingly shown that the assessment can be limited to 10,000 years. In the opinion of the review committee, the radionuclide inventory that SKB refers to as conservative, and which has been used as an assumption in the calculations, is beyond the limits of the present licence. In the case of the realistic inventory, there is adequate agreement with the licensed inventory. It cannot be excluded that the inventory of certain long-lived and significant radionuclides may be underestimated

  14. The effects of ionizing radiation and review of the Young-Woollard document

    International Nuclear Information System (INIS)

    Marko, A.M.; Myers, D.K.

    1983-04-01

    A review of a document entitled 'The Health Dangers of Uranium Mining and Jurisdictional Questions' has been prepared. E.R. Young and R.F. Woollard submitted, in 1980, this document to the British Columbia Royal Commission of Inquiry, Health and Environmental Protection - Uranium Mining (INIS-mf--7757). When we reviewed the document it became clear that the views concerning effects of low-level radiation including alpha irradiation do not have scientific consensus. For this reason we have included a brief summary of conclusions produced by various international and national bodies on the effects of radiation on humans

  15. Peer review of RELAP5/MOD3 documentation

    International Nuclear Information System (INIS)

    Craddick, W.G.

    1993-01-01

    A peer review was performed on a portion of the documentation of the RELAP5/MOD3 computer code. The review was performed in two phases. The first phase was a review of Volume 3, Developmental Assessment problems, and Volume 4, Models and Correlations. The reviewers for this phase were Dr. Peter Griffith, Dr. Yassin Hassan, Dr. Gerald S. Lellouche, Dr. Marino di Marzo and Mr. Mark Wendel. The reviewers recommended a number of improvements, including using a frozen version of the code for assessment guided by a validation plan, better justification for flow regime maps and extension of models beyond their data base. The second phase was a review of Volume 6, Quality Assurance of Numerical Techniques in RELAP5/MOD3. The reviewers for the second phase were Mr. Mark Wendel and Dr. Paul T. Williams. Recommendations included correction of numerous grammatical and typographical errors and better justification for the use of Lax's Equivalence Theorem

  16. Management services, quality assurance, and safety

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Broad technical and administrative support for the programmatic research and development activities of the Fusion Energy Division is provided by the Management Services Section and by the division's quality assurance (QA) and safety programs. Support is provided through effective communication with division programmatic staff and through the coordination of resources from disciplines outside the division. The QA activity in the division emphasizes the development and documentation of a QA program that conforms to national standards, the review and approval of engineering documents, supplier surveillance, identification and documentation of nonconforming items, audits, and QA assessments/plans. The division's safety activities include a formal safety program, emergency planning activities, and environmental protection services. Efforts devoted to the removal of hazardous wastes from division facilities were expanded during 1986

  17. On some aspects of nuclear safety surveillance and review

    International Nuclear Information System (INIS)

    Li Ganjie; Zhu Hong; Zhou Shanyuan

    2004-01-01

    Five aspects of the nuclear safety surveillance and review are discussed: Strict implementation of nuclear safety regulation, making the nuclear safety surveillance and review more normalization, procedurization, scientific decision-making; Strictly requiring the applicant to comply with the requirements of codes, do not allowing the utilization of mixing of codes; Properly controlling the strictness for the review on significant non-conformance; Strengthening the co-operation between regional offices and technical support units, Properly treat the relations between administrational management unit and technical support units. (authors)

  18. A review of models relevant to road safety.

    Science.gov (United States)

    Hughes, B P; Newstead, S; Anund, A; Shu, C C; Falkmer, T

    2015-01-01

    It is estimated that more than 1.2 million people die worldwide as a result of road traffic crashes and some 50 million are injured per annum. At present some Western countries' road safety strategies and countermeasures claim to have developed into 'Safe Systems' models to address the effects of road related crashes. Well-constructed models encourage effective strategies to improve road safety. This review aimed to identify and summarise concise descriptions, or 'models' of safety. The review covers information from a wide variety of fields and contexts including transport, occupational safety, food industry, education, construction and health. The information from 2620 candidate references were selected and summarised in 121 examples of different types of model and contents. The language of safety models and systems was found to be inconsistent. Each model provided additional information regarding style, purpose, complexity and diversity. In total, seven types of models were identified. The categorisation of models was done on a high level with a variation of details in each group and without a complete, simple and rational description. The models identified in this review are likely to be adaptable to road safety and some of them have previously been used. None of systems theory, safety management systems, the risk management approach, or safety culture was commonly or thoroughly applied to road safety. It is concluded that these approaches have the potential to reduce road trauma. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  20. Nuclear Criticality Safety Data Book

    Energy Technology Data Exchange (ETDEWEB)

    Hollenbach, D. F. [Y-12 National Security Complex, Oak Ridge, TN (United States)

    2016-11-14

    The objective of this document is to support the revision of criticality safety process studies (CSPSs) for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex (Y-12). This design analysis and calculation (DAC) document contains development and justification for generic inputs typically used in Nuclear Criticality Safety (NCS) DACs to model both normal and abnormal conditions of processes at UPF to support CSPSs. This will provide consistency between NCS DACs and efficiency in preparation and review of DACs, as frequently used data are provided in one reference source.

  1. Nuclear Criticality Safety Data Book

    International Nuclear Information System (INIS)

    Hollenbach, D. F.

    2016-01-01

    The objective of this document is to support the revision of criticality safety process studies (CSPSs) for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex (Y-12). This design analysis and calculation (DAC) document contains development and justification for generic inputs typically used in Nuclear Criticality Safety (NCS) DACs to model both normal and abnormal conditions of processes at UPF to support CSPSs. This will provide consistency between NCS DACs and efficiency in preparation and review of DACs, as frequently used data are provided in one reference source.

  2. Technical basis for the ITER detailed design report, cost review and safety analysis (DDR)

    International Nuclear Information System (INIS)

    1997-01-01

    The ITER Detailed Design Report (DDR), Cost Review and Safety Analysis is the 3rd major milestone representing the progress made in the ITER Engineering Design Activities. With the approval of the Interim Design Report (IDR), it has been possible to freeze the main concepts and system approaches for ITER and to develop the design in more detail for the individual components and sub-systems. This report, although designed to be fully understandable as a separate document, focusses particularly on the main changes since the IDR

  3. IRSN safety research carried out for reviewing geological disposal safety case

    International Nuclear Information System (INIS)

    Serres, Christophe; Besnus, Francois; Gay, Didier

    2010-01-01

    The Radiation Protection and Nuclear Safety Institute develops a research programme on scientific issues related to geological disposal safety in order to supporting the technical assessment carried out in the framework of the regulatory review process. This research programme is organised along key safety questions that deal with various scientific disciplines as geology, hydrogeology, mechanics, geochemistry or physics and is implemented in national and international partnerships. It aims at providing IRSN with sufficient independent knowledge and scientific skills in order to be able to assess whether the scientific results gained by the waste management organisation and their integration for demonstrating the safety of the geological disposal are acceptable with regard to the safety issues to be dealt with in the Safety Case. (author)

  4. Narrative review: the promotion of gabapentin: an analysis of internal industry documents.

    Science.gov (United States)

    Steinman, Michael A; Bero, Lisa A; Chren, Mary-Margaret; Landefeld, C Seth

    2006-08-15

    Internal documents from the pharmaceutical industry provide a unique window for understanding the structure and methods of pharmaceutical promotion. Such documents have become available through litigation concerning the promotion of gabapentin (Neurontin, Pfizer, Inc., New York, New York) for off-label uses. To describe how gabapentin was promoted, focusing on the use of medical education, research, and publication. Court documents available to the public from United States ex. rel David Franklin vs. Pfizer, Inc., and Parke-Davis, Division of Warner-Lambert Company, mostly from 1994-1998. All documents were reviewed by 1 author, with selected review by coauthors. Marketing strategies and tactics were identified by using an iterative process of review, discussion, and re-review of selected documents. The promotion of gabapentin was a comprehensive and multifaceted process. Advisory boards, consultants meetings, and accredited continuing medical education events organized by third-party vendors were used to deliver promotional messages. These tactics were augmented by the recruitment of local champions and engagement of thought leaders, who could be used to communicate favorable messages about gabapentin to their physician colleagues. Research and scholarship were also used for marketing by encouraging "key customers" to participate in research, using a large study to advance promotional themes and build market share, paying medical communication companies to develop and publish articles about gabapentin for the medical literature, and planning to suppress unfavorable study results. Most available documents were submitted by the plaintiff and may not represent a complete picture of marketing practices. Activities traditionally considered independent of promotional intent, including continuing medical education and research, were extensively used to promote gabapentin. New strategies are needed to ensure a clear separation between scientific and commercial activity.

  5. Performance Testing Methodology for Safety-Critical Programmable Logic Controller

    International Nuclear Information System (INIS)

    Kim, Chang Ho; Oh, Do Young; Kim, Ji Hyeon; Kim, Sung Ho; Sohn, Se Do

    2009-01-01

    The Programmable Logic Controller (PLC) for use in Nuclear Power Plant safety-related applications is being developed and tested first time in Korea. This safety-related PLC is being developed with requirements of regulatory guideline and industry standards for safety system. To test that the quality of the developed PLC is sufficient to be used in safety critical system, document review and various product testings were performed over the development documents for S/W, H/W, and V/V. This paper provides the performance testing methodology and its effectiveness for PLC platform conducted by KOPEC

  6. Occupational safety and health management in the construction industry: a review.

    Science.gov (United States)

    Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin

    2017-09-11

    The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.

  7. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  8. Domestic Regulation for Periodic Safety Review of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Daesik; Ahn, Seunghoon; Auh, Geunsun; Lee, Jonghyeok

    2015-01-01

    The so-called Periodic Safety Review (PSR) has been carried out such safety assessment throughout its life, on a periodic basis. In January 2001, the Atomic Energy Act and related regulations were amended to adopt the PSR institutional scheme from IAEA Nuclear Safety Guide 50-SG-O12. At that time the safety assessment was made to review the plant safety on 10 safety factors, such as aging management and emergency planning, where the safety factor indicates the important aspects of safety of an operating NPP to be addressed in the PSR. According to this legislation, the domestic utility, the KHNP has conducted the PSR for the operating NPP of 10 years coming up from operating license date, starting since May 2000. Some revisions in the PSR rule were made to include the additional safety factors last year. This paper introduces the current status of the PSR review and regulation, in particular new safety factors and updated technical regulation. Comprehensive safety assessment for Korea Nuclear Power Plants have performed a reflecting design and procedure changes and considering the latest technology every 10 years. This paper also examined the PSR system changes in Korea. As of July 2015, reviews for PSR of 18 units have been completed, with 229 nuclear safety improvement items. And implementation have been completed for 165 of them. PSR system has been confirmed that it has contributed to improvement of plant safety. In addition, this paper examined the PSR system change in Korea

  9. Nuclear safety review for the year 2001

    International Nuclear Information System (INIS)

    2002-07-01

    The Nuclear Safety Review for the Year 2001 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts. Part 1 describes those events in 2001 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety. Part 2 describes some of the IAEA's efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2001. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2001. Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2001 was presented to the March 2002 session of IAEA's Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2002 that were considered pertinent to the discussion of events during 2001

  10. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement

  11. Interagency Nuclear Safety Review Panel Power System Subpanel review for the Ulysses mission

    International Nuclear Information System (INIS)

    McCulloch, W.H.

    1991-01-01

    As part of the Interagency Nuclear Safety Review Panel's assessment of the nuclear safety of NASA's Ulysses Mission to investigate properties of the sun, the Power System Subpanel has reviewed the safety analyses and risk evaluations done for the General Purpose Heat Source-Radioisotope Thermoelectric Generator which provides on-board electrical power for the spacecraft. This paper summarizes the activities and results of that review. In general, the approach taken in the primary analysis, executed by the General Electric Company under contract to the Department of Energy, and the resulting conclusions were confirmed by the review. However, the Subpanel took some exceptions and modified the calculations accordingly, producing an independent evaluation of potential releases of radioactive fuel in launch and reentry accidents. Some of the more important of these exceptions are described briefly

  12. Integrated Plant Safety Assessment, Systematic Evaluation Program: Yankee Nuclear Power Station (Docket No. 50-29)

    International Nuclear Information System (INIS)

    1987-10-01

    The US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to the final Integrated Plant Safety Assessment Report (IPSAR) (NUREG-0825), under the scope of the Systematic Evaluation Program (SEP), for Yankee Atomic Electric Company's Yankee Nuclear Power Station located in Rowe, Massachusetts. The SEP was initiated by the NRC to review the design of older operating nuclear power plants to reconfirm and document their safety. This report documents the review completed under the SEP for those issues that required refined engineering evaluations or the continuation of ongoing evaluations after the Final IPSAR for the Yankee plant was issued. The review has provided for (1) an assessment of the significance of differences between current technical positions on selected safety issues and those that existed when Yankee was licensed, (2) a basis for deciding how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. 2 tabs

  13. Documented Safety Analysis for the Waste Storage Facilities March 2010

    Energy Technology Data Exchange (ETDEWEB)

    Laycak, D T

    2010-03-05

    This Documented Safety Analysis (DSA) for the Waste Storage Facilities was developed in accordance with 10 CFR 830, Subpart B, 'Safety Basis Requirements,' and utilizes the methodology outlined in DOE-STD-3009-94, Change Notice 3. The Waste Storage Facilities consist of Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area portion of the DWTF complex. These two areas are combined into a single DSA, as their functions as storage for radioactive and hazardous waste are essentially identical. The B695 Segment of DWTF is addressed under a separate DSA. This DSA provides a description of the Waste Storage Facilities and the operations conducted therein; identification of hazards; analyses of the hazards, including inventories, bounding releases, consequences, and conclusions; and programmatic elements that describe the current capacity for safe operations. The mission of the Waste Storage Facilities is to safely handle, store, and treat hazardous waste, transuranic (TRU) waste, low-level waste (LLW), mixed waste, combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL (as well as small amounts from other DOE facilities).

  14. Report of the IPERS (International Peer Review Service) review mission for the Bohunice-V2 nuclear power plant Level 1 probabilistic safety assessment in the Slovak Republic 17 to 28 January 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services (IPERS) review of the probabilistic safety assessment (PSA) for the Bohunice-V2 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. The results presented herein reflect the views of the international experts carrying out the review. They are provided for consideration by the responsible authorities of the Slovak Republic. 12 refs, 4 tabs

  15. Nitrogen-system safety study: Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    1982-07-01

    The Department of Energy has primary responsibility for the safety of operations at DOE-owned nuclear facilities. The guidelines for the analysis of credible accidents are outlined in DOE Order 5481.1. DOE has requested that existing plant facilities and operations be reviewed for potential safety problems not covered by standard industrial safety procedures. This review is being conducted by investigating individual facilities and documenting the results in Safety Study Reports which will be compiled to form the Existing Plant Final Safety Analysis Report which is scheduled for completion in September, 1984. This Safety Study documents the review of the Plant Nitrogen System facilities and operations and consists of Section 4.0, Facility and Process Description, and Section 5.0, Accident Analysis, of the Final Safety Analysis Report format. The existing nitrogen system consists of a Superior Air Products Company Type D Nitrogen Plant, nitrogen storage facilities, vaporization facilities and a distribution system. The system is designed to generate and distribute nitrogen gas used in the cascade for seal feed, buffer systems, and for servicing equipment when exceptionally low dew points are required. Gaseous nitrogen is also distributed to various process auxiliary buildings. The average usage is approximately 130,000 standard cubic feet per day

  16. Peer review of RELAP5/MOD3 documentation

    International Nuclear Information System (INIS)

    Craddick, W.G.

    1994-01-01

    A peer review was performed on a portion of the documentation of the RELAP5/MOD3 computer code. The review was performed in two phases. The first phase was a review of Vol. III, Developmental Assessment Problems, and Vol. IV, Models and Correlations. The reviewers for this phase were Dr. Peter Griffith, Dr. Yassin Hassan, Dr. Gerald S. Lellouche, Dr. Marino di Marzo and Mr. Mark Wendel. The reviewers recommended a number of improvements, including using a frozen version of the code for assessment guided by a validation plan, better discussion of discrepancies between the code and experimental data, and better justification for flow regime maps and extension of models beyond their data base. The second phase was a review of Vol. VI, Quality Assurance of Numerical Techniques in RELAP5/MOD3. The reviewers for the second phase were Mr. Mark Wendel and Dr. Paul T. Williams. Recommendations included correction of numerous grammatical and typographical errors and better justification for the use of Lax's Equivalence Theorem

  17. Integrated plant safety assessment. Systematic evaluation program, Big Rock Point Plant (Docket No. 50-155). Final report

    International Nuclear Information System (INIS)

    1984-05-01

    The Systematic Evaluation Program was initiated in February 1977 by the U.S. Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when the supplement to the Final Integrated Plant Safety Assessment Report has been issued. This report documents the review of the Big Rock Point Plant, which is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. It also addresses a majority of the pending licensing actions for Big Rock Point, which include TMI Action Plan requirements and implementation criteria for resolved generic issues. Equipment and procedural changes have been identified as a result of the review

  18. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  19. Review of Public Safety in Viewpoint of Complex Networks

    International Nuclear Information System (INIS)

    Gai Chengcheng; Weng Wenguo; Yuan Hongyong

    2010-01-01

    In this paper, a brief review of public safety in viewpoint of complex networks is presented. Public safety incidents are divided into four categories: natural disasters, industry accidents, public health and social security, in which the complex network approaches and theories are need. We review how the complex network methods was developed and used in the studies of the three kinds of public safety incidents. The typical public safety incidents studied by the complex network methods in this paper are introduced, including the natural disaster chains, blackouts on electric power grids and epidemic spreading. Finally, we look ahead to the application prospects of the complex network theory on public safety.

  20. Technical basis for the ITER detailed design report, cost review and safety analysis (DDR)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The ITER Detailed Design Report (DDR), Cost Review and Safety Analysis is the 3rd major milestone representing the progress made in the ITER Engineering Design Activities. With the approval of the Interim Design Report (IDR), it has been possible to freeze the main concepts and system approaches for ITER and to develop the design in more detail for the individual components and sub-systems. This report, although designed to be fully understandable as a separate document, focusses particularly on the main changes since the IDR. Refs, figs, tabs

  1. The necessity of periodic fire safety review

    International Nuclear Information System (INIS)

    Mowrer, D.S.

    1998-01-01

    Effective fire safety requires the coordinated integration of many diverse elements. Clear fire safety objectives are defined by plant management and/or regulatory authorities. Extensive and time-consuming systematic analyses are performed. Fire safety features (both active and passive) are installed and maintained, and administrative programs are established and implemented to achieve the defined objectives. Personnel are rigorously trained. Given the time, effort and monetary resources expended to achieve a specific level of fire safety, conducting periodic assessments to verify that the specified level of fire safety has been achieved and is maintained is a matter of common sense. Periodic fire safety reviews and assessment play an essential role in assuring continual nuclear safety in the world's power plants

  2. IAEA activities to prepare safety codes and guides for thermal neutron nuclear power plants

    International Nuclear Information System (INIS)

    Iansiti, E.

    1977-01-01

    In accordance with the programme presented to, and endorsed by, the eighteenth General Conference in September 1974, the IAEA is now developing a complete set of safety codes and guides that will represent recommendations for the safety of thermal neutron power plants. The safety codes outline the minimum requirements for achieving this safety, and the safety guides set forth the criteria, procedures and methods to implement the safety codes. The whole programme is directed towards the five areas of Governmental Organization, Siting, Design, Operation, and Quality Assurance. One Scientific Secretary from the Agency Secretariat is responsible for each of these areas and a Co-ordinator takes care of common problems. For the development of each of these documents a working group of a few world experts is first convened which prepare a preliminary draft. This draft is then reviewed by a larger, international Technical Review Committee (one for each of the five areas) and a subsequent review by the Senior Advisory Group - with representatives from 20 states - ensures that the document is well coordinated within the programme. At this stage, it is sent to Member States for comments. The Technical Review Committee concerned is reconvened to integrate these comments into the document, and, after a final review by the Senior Advisory Group, the document is ready for transmission to the Director General of the Agency for endorsement and publication. A preliminary to this procedure is the collation by the Secretariat of large amounts of information submitted by Member States so that the first draft is really based on a very complete knowledge of what is done in each area all over the world. This collation frequently reveals differences in approach which are not random but due, rather, to the local conditions and the types of reactors. These differences must be harmonized in the documents produced without detracting from the effectiveness of the code or guide. The whole

  3. Technical Review Report for the Model 9975-96 Package Safety Analysis Report for Packaging (S-SARP-G-00003, Revision 0, January 2008)

    International Nuclear Information System (INIS)

    West, M.

    2009-01-01

    This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the U.S. Department of Energy (DOE), on the Safety Analysis Report for Packaging, Model 9975, Revision 0, dated January 2008 (S-SARP-G-00003, the SARP). The review includes an evaluation of the SARP, with respect to the requirements specified in 10 CFR 71, and in International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9975-96 Package is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The safety analysis of the Model 9975-85 Packaging is documented in the Safety Analysis Report for Packaging, Model 9975, B(M)F-85, Revision 0, dated December 2003. The Model 9975-85 Package is certified by DOE Certificate of Compliance (CoC) package identification number, USA/9975/B(M)F-85, for the transportation of Type B quantities of uranium metal/oxide, 238 Pu heat sources, plutonium/uranium metals, plutonium/uranium oxides, plutonium composites, plutonium/tantalum composites, 238 Pu oxide/beryllium metal.

  4. Nuclear safety review for the year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The nuclear safety review for the year 2000 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts: Part 1 describes those events in 2000 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety; Part 2 describes some of the IAEA efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2000. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2000; Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2000 was presented to the March 2001 session of the IAEA Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2001 that were considered pertinent to the discussion of events during 2000. In such cases, a note containing the more recent information has been provided in the form of a footnote

  5. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  6. Nuclear Criticality Safety Assessment Using the SCALE Computer Code Package. A demonstration based on an independent review of a real application

    International Nuclear Information System (INIS)

    Mennerdahl, Dennis

    1998-06-01

    The purpose of this project was to instruct a young scientist from the Lithuanian Energy Institute (LEI) on how to carry out an independent review of a safety report. In particular, emphasis, was to be put on how to use the personal computer version of the calculation system SCALE 4.3 in this process. Nuclear criticality safety together with radiation shielding from gamma and neutron sources were areas of interest. This report concentrates on nuclear criticality safety aspects while a separate report covers radiation shielding. The application was a proposed storage cask for irradiated fuel assemblies from the Ignalina RBMK reactors in Lithuania. The safety report contained various documents involving many design and safety considerations. A few other documents describing the Ignalina reactors and their operation were available. The time for the project was limited to approximately one month, starting 'clean' with a SCALE 4.3 CD-ROM, a thick safety report and a fast personal computer. The results should be of general interest to Swedish authorities, in particular related to shielding where experience in using advanced computer codes like those available in SCALE is limited. It has been known for many years that criticality safety is very complicated, and that independent reviews are absolutely necessary to reduce the risk from quite common errors in the safety assessments. Several important results were obtained during the project. Concerning use of SCALE 4.3, it was confirmed that a young scientist, without extensive previous experience in the code system, can learn to use essentially all options. During the project, it was obvious that familiarity with personal computers, operating systems (including network system) and office software (word processing, spreadsheet and Internet browser software) saved a lot of time. Some of the Monte Carlo calculations took several hours. Experience is valuable in quickly picking out input or source document errors. Understanding

  7. Integrated plant safety assessment: systematic evaluation program. Haddam Neck Plant, Connecticut Yankee Atomic Power Company. Docket No. 50-213

    International Nuclear Information System (INIS)

    1983-03-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Haddam Neck Plant, operated by Connecticut Yankee Atomic Power Company. The Haddam Neck Plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  8. Integrated plant safety assessment: Systematic Evaluation Program. LaCrosse Boiling Water Reactor, Dairyland Power Cooperative, Docket No. 50-409

    International Nuclear Information System (INIS)

    1983-04-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the La Crosse Boiling Water Reactor, operated by Dairyland Power Cooperative. The La Crosse plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addresed. Equipment and procedural changes have been identified as a result of the review

  9. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  10. Desonide: a review of formulations, efficacy and safety.

    Science.gov (United States)

    Kahanek, Nr; Gelbard, Cg; Hebert, Aa

    2008-07-01

    Desonide is a low-potency topical corticosteroid that has been used for decades in the treatment of steroid-responsive dermatoses. The favorable safety profile of this topical agent makes it ideal for patients of all ages. This article provides a review of desonide's history, pharmacodynamic properties, vehicle technology, efficacy and safety. Randomized controlled trials, as well as open-label and non-comparative studies, case series and reports, experimental models, and data from the Galderma pharmacovigiliance program were reviewed in order to address the clinical efficacy and safety of desonide. Clinical efficacy and safety have been proven in multiple clinical trials. In addition to cream, lotion and ointment formulations, the recently developed hydrogel and foam preparations have increased desonide's versatility and patient tolerability.

  11. Seismic safety review mission Almaty WWR 10 MW research reactor Almaty, Kazakhstan. Final report

    International Nuclear Information System (INIS)

    Gurpinar, A.; Slemmons, D.B.; David, M.; Masopust, R.

    1995-06-01

    On the request of the government of Kazakhstan and within the scope of the TC project KAZ/0/004, a seismic safety review mission was conducted in Almaty, 8-19 May 1995 for the WWR 10 Mw research reactor. This review followed the fact finding mission which visited Almaty in November 1993 together with an INSARR mission. At that time some information regarding the seismotectonic setting of the site as well as the seismic capacity of the facility was obtained. This document presents the results of further work carried out on both the issues. It discusses technical session findings on geology, seismology, structures and equipments. In the end conclusions and recommendations of the mission are given. 4 refs, figs, tabs, 18 photos

  12. The regulatory review: general comments, current status of review, identification of critical issues

    International Nuclear Information System (INIS)

    Vigfusson, J.; Franck, E.

    2004-01-01

    Typically, a lot of interesting and important details add up to give a coherent and convincing picture of a safe repository. A good portion of these details must be studied and the scientific basis of the system must be clearly understood by the reviewing authority in order to be able to pass a judgement on the safety case. HSK has already received a large part of the documentation relating to the project, including the three high level documents that summarize the synthesis of the geological information, the demonstration of repository design and construction feasibility and the safety case. After a first look at the contents of the documentation we would like to complement Nagra on the maturity and clarity of the presentation in these reports. At this early stage, we shall not present any review judgements. The reviewer usually is dependent upon having not only the high level documents but also all the detailed reference reports in front of him in order to do his job, and HSK is still receiving very relevant documents. Thus we are still at the very beginning of our review. Here, we offer some comments of general nature about the review process and mention a few points that seem to be uppermost in our mind at this stage. (author)

  13. A systematic review of the safety climate intervention literature: Past trends and future directions.

    Science.gov (United States)

    Lee, Jin; Huang, Yueng-Hsiang; Cheung, Janelle H; Chen, Zhuo; Shaw, William S

    2018-04-26

    Safety climate represents the meaningfulness of safety and how safety is valued in an organization. The contributions of safety climate to organizational safety have been well documented. There is a dearth of empirical research, however, on specific safety climate interventions and their effectiveness. The present study aims at examining the trend of safety climate interventions and offering compiled information for designing and implementing evidence-based safety climate interventions. Our literature search yielded 384 titles that were inspected by three examiners. Using a stepwise process that allowed for assessment of interobserver agreement, 19 full articles were selected and reviewed. Results showed that 10 out of the 19 articles (52.6%) were based on a quasi-experimental pre- and postintervention design, whereas 42.1% (n = 8) studies were based on a mixed-design approach (including both between- and within-subject design). All interventions in these 19 studies involved either safety-/health-related communication or education/training. Improvement of safety leadership was also a common component of safety climate interventions. According to the socio-technical systems classification of intervention strategies, all studies were categorized as interventions focusing on improving organizational and managerial structure as well as the personnel subsystem; four of them also aimed at improving technological aspects of work, and five of them aimed at improving the physical work subsystem. In general, a vast majority of the studies (89.5%, n = 17) showed a statistically significant improvement in safety climate across their organizations postintervention. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  14. Convention on nuclear safety. Final act

    International Nuclear Information System (INIS)

    1994-01-01

    The Diplomatic Conference, which was convened by the International Atomic Energy Agency at its Headquarters from 14 to 17 June 1994, adopted the Convention on Nuclear Safety reproduced in document INFCIRC/449 and the Final Act of the Conference. The text of the Final Act of the Conference, including an annexed document entitled ''Some clarification with respect to procedural and financial arrangements, national reports, and the conduct of review meetings, envisaged in the Convention on Nuclear Safety'', is reproduced in the Attachment hereto for the information of all Member States

  15. 78 FR 11902 - Review of Gun Safety Technologies

    Science.gov (United States)

    2013-02-20

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1615] Review of Gun Safety...'s Plan to reduce gun violence released on January 16, 2013, the U.S. Department of Justice, Office... emerging gun safety technologies and plans to issue a report on the availability and use of those...

  16. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  17. Review of fuel safety criteria in France

    Energy Technology Data Exchange (ETDEWEB)

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier [Institut de Radioprotection et du Surete Nucleaire, Fontenay-aux-Roses (France)

    2018-01-15

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  18. Review of fuel safety criteria in France

    International Nuclear Information System (INIS)

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier

    2018-01-01

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  19. A review of midwifery education curriculum documents in Jordan.

    Science.gov (United States)

    Shaban, Insaf; Leap, Nicky

    2012-12-01

    There is worldwide recognition that midwives are specialists in normal pregnancy, labour and birth and the postnatal period and that they should be educated to be primary providers of maternity care. In Jordan midwives currently have limited opportunities to fulfil this role. Since the mid-1980s, two public community colleges have offered three-year diploma midwifery education programmes in two major cities in Jordan. In 2002 the first and only four-year bachelor of midwifery education programme was established in one public university. A review to describe the design and content of midwifery education programmes in Jordan and address the question: Does the design of midwifery education programmes in Jordan encourage confidence that graduates will be competent to practise to the full capacity of the internationally defined role and scope of practice of the midwife and undertake the role of primary maternity care providers for women with low-risk pregnancies? A review of Jordanian midwifery education curriculum documents was undertaken using information and documents provided by midwifery programme coordinators. Programme coordinators in all institutions in Jordan providing midwifery education programmes. The curriculum documents reflected a medical model, with an emphasis on illness and intervention rather than preparation for the internationally defined full role and scope of practice of the midwife. This study provides a profile of midwifery education curriculum documents in Jordan with recommendations for changes that would position midwives as potential primary maternity care providers for women in Jordan who have uncomplicated pregnancies. Copyright © 2011 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  20. Standard review plan for reviewing safety analysis reports for dry metallic spent fuel storage casks

    International Nuclear Information System (INIS)

    1988-01-01

    The Cask Standard Review Plan (CSRP) has been prepared as guidance to be used in the review of Cask Safety Analysis Reports (CSARs) for storage packages. The principal purpose of the CSRP is to assure the quality and uniformity of storage cask reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The CSRP also sets forth solutions and approaches determined to be acceptable in the past by the NRC staff in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a CSAR does not have to follow the solutions or approaches presented in the CSRP. However, applicants should recognize that the NRC staff has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches

  1. Packaging review guide for reviewing safety analysis reports for packagings: Revision 0

    International Nuclear Information System (INIS)

    Fischer, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1987-09-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. These certification review policies and procedures are established to ensure that DOE packaging designs and operations meet safety criteria at least equivalent to the standards prescribed by the Nuclear Regulatory Commission (NRC) certification process for packaging. The Packaging Review Guide (PRG) is not a DOE order, but has been prepared as guidance for the Packaging Certification Staff (PCS) under the Certifying Official, Office of Security Evaluations, or designated representatives. The principal purpose of the PRG is to assure the quality and uniformity of PCS reviews, and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The PRG also sets forth solutions and approaches determined to be acceptable in the past by the PCS in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented in the PRG. However, applicants should recognize that the PCS has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches. Finally, it is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 7 refs., 15 figs., 14 tabs

  2. An International Peer Review of the Safety Options Dossier of the Project for Disposal of Radioactive Waste in Deep Geological Formations (Cigéo). Final Report of the IAEA International Review Team November 2016

    International Nuclear Information System (INIS)

    2017-07-01

    The French Nuclear Safety Authority (Autorité de sûreté nucléaire, ASN) is preparing the evaluation of a licence application for the creation of a deep geological disposal facility in 2018, called Cigéo, for intermediate level, high level and long lived radioactive waste. This licence is preceded by the submission of a Safety Options Dossier to ASN, which provides the French National Radioactive Waste Management Agency (Agence nationale pour la gestion des déchets radioactifs, Andra) the possibility to receive advice from ASN on the preparation of the licence application on the safety principles and approach. The Safety Options Dossier sets out the chosen objectives, concepts and principles for ensuring the safety of the facility. ASN requested the IAEA to organize an international peer review of the Safety Options Dossier. This publication presents the consensus view of the international group of experts convened by the IAEA to conduct the review against the relevant IAEA safety standards and proven international practice and experience. The experts acted in a personal capacity and the views expressed do not necessarily reflect those of the IAEA, the governments of the nominating Member States or the nominating organizations. The basis of this peer review is the set of documents provided by Andra, as the agency responsible for the development of the Cigéo project and for its safety. Consequently, the findings of the reviews are addressed directly to Andra. This publication, however, is primarily submitted to ASN to review the outcomes of the Andra project.

  3. Review on JMTR safety design for LEU core conversion

    International Nuclear Information System (INIS)

    Komori, Yoshihiro; Yokokawa, Makoto; Saruta, Toru; Inada, Seiji; Sakurai, Fumio; Yamamoto, Katsumune; Oyamada, Rokuro; Saito, Minoru

    1993-12-01

    Safety of the JMTR was fully reviewed for the core conversion to low enriched uranium fuel. Fundamental policies for the JMTR safety design were reconsidered based on the examination guide for safety design of test and research reactors, and safety of the JMTR was confirmed. This report describes the safety design of the JMTR from the viewpoint of major functions for reactor safety. (author)

  4. [Improving patient safety through voluntary peer review].

    Science.gov (United States)

    Kluge, S; Bause, H

    2015-01-01

    The intensive care unit (ICU) is one area of the hospital in which processes and communication are of primary importance. Errors in intensive care units can lead to serious adverse events with significant consequences for patients. Therefore quality and risk-management are important measures when treating critically ill patients. A pragmatic approach to support quality and safety in intensive care is peer review. This approach has gained significant acceptance over the past years. It consists of mutual visits by colleagues who conduct standardised peer reviews. These reviews focus on the systematic evaluation of the quality of an ICU's structure, its processes and outcome. Together with different associations, the State Chambers of Physicians and the German Medical Association have developed peer review as a standardized tool for quality improvement. The common goal of all stakeholders is the continuous and sustainable improvement in intensive care with peer reviews significantly increasing and improving communication between professions and disciplines. Peer reviews secure the sustainability of planned change processes and consequently lead the way to an improved culture of quality and safety.

  5. Report of the IPERS (International Peer Review Service) phase 1 review mission for the Temelin nuclear power plant Level 1 probabilistic safety assessment in the Czech Republic 24 April to 5 May 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services Phase 1 review of the internal events, Level 1 probabilistic safety assessment (PSA) for the Temelin Unit 1 and 2 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and future plant operator. The results presented herein reflect the views of the international experts carrying out the review. They are provided for consideration by the responsible authorities of the Czech Republic. 2 refs, 1 fig., 5 tabs

  6. Hazardous Waste/Mixed Waste Treatment Building Safety Information Document (SID)

    International Nuclear Information System (INIS)

    Fatell, L.B.; Woolsey, G.B.

    1993-01-01

    This Safety Information Document (SID) provides a description and analysis of operations for the Hazardous Waste/Mixed Waste Disposal Facility Treatment Building (the Treatment Building). The Treatment Building has been classified as a moderate hazard facility, and the level of analysis performed and the methodology used are based on that classification. Preliminary design of the Treatment Building has identified the need for two separate buildings for waste treatment processes. The term Treatment Building applies to all these facilities. The evaluation of safety for the Treatment Building is accomplished in part by the identification of hazards associated with the facility and the analysis of the facility's response to postulated events involving those hazards. The events are analyzed in terms of the facility features that minimize the causes of such events, the quantitative determination of the consequences, and the ability of the facility to cope with each event should it occur. The SID presents the methodology, assumptions, and results of the systematic evaluation of hazards associated with operation of the Treatment Building. The SID also addresses the spectrum of postulated credible events, involving those hazards, that could occur. Facility features important to safety are identified and discussed in the SID. The SID identifies hazards and reports the analysis of the spectrum of credible postulated events that can result in the following consequences: Personnel exposure to radiation; Radioactive material release to the environment; Personnel exposure to hazardous chemicals; Hazardous chemical release to the environment; Events leading to an onsite/offsite fatality; and Significant damage to government property. The SID addresses the consequences to the onsite and offsite populations resulting from postulated credible events and the safety features in place to control and mitigate the consequences

  7. Hazardous Waste/Mixed Waste Treatment Building Safety Information Document (SID)

    Energy Technology Data Exchange (ETDEWEB)

    Fatell, L.B.; Woolsey, G.B.

    1993-04-15

    This Safety Information Document (SID) provides a description and analysis of operations for the Hazardous Waste/Mixed Waste Disposal Facility Treatment Building (the Treatment Building). The Treatment Building has been classified as a moderate hazard facility, and the level of analysis performed and the methodology used are based on that classification. Preliminary design of the Treatment Building has identified the need for two separate buildings for waste treatment processes. The term Treatment Building applies to all these facilities. The evaluation of safety for the Treatment Building is accomplished in part by the identification of hazards associated with the facility and the analysis of the facility`s response to postulated events involving those hazards. The events are analyzed in terms of the facility features that minimize the causes of such events, the quantitative determination of the consequences, and the ability of the facility to cope with each event should it occur. The SID presents the methodology, assumptions, and results of the systematic evaluation of hazards associated with operation of the Treatment Building. The SID also addresses the spectrum of postulated credible events, involving those hazards, that could occur. Facility features important to safety are identified and discussed in the SID. The SID identifies hazards and reports the analysis of the spectrum of credible postulated events that can result in the following consequences: Personnel exposure to radiation; Radioactive material release to the environment; Personnel exposure to hazardous chemicals; Hazardous chemical release to the environment; Events leading to an onsite/offsite fatality; and Significant damage to government property. The SID addresses the consequences to the onsite and offsite populations resulting from postulated credible events and the safety features in place to control and mitigate the consequences.

  8. Using systematic review in occupational safety and health.

    Science.gov (United States)

    Howard, John; Piacentino, John; MacMahon, Kathleen; Schulte, Paul

    2017-11-01

    Evaluation of scientific evidence is critical in developing recommendations to reduce risk. Healthcare was the first scientific field to employ a systematic review approach for synthesizing research findings to support evidence-based decision-making and it is still the largest producer and consumer of systematic reviews. Systematic reviews in the field of occupational safety and health are being conducted, but more widespread use and adoption would strengthen assessments. In 2016, NIOSH asked RAND to develop a framework for applying the traditional systematic review elements to the field of occupational safety and health. This paper describes how essential systematic review elements can be adapted for use in occupational systematic reviews to enhance their scientific quality, objectivity, transparency, reliability, utility, and acceptability. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  9. An international benchmark on safety review practices at nuclear power plants

    International Nuclear Information System (INIS)

    Wahlstroem, B.; Kettunen, J.

    2000-02-01

    A benchmarking exercise on safety review practices at nuclear power plants in Finland, Sweden and the United Kingdom has been carried out. In the exercise a comparison was made between documented practices at the Forsmark, Hinkley Point A and Olkiluoto nuclear power plants. In addition a total of 28 persons at FKA, Magnox and TVO were interviewed on their views on the efficiency of the plant modification processes in the later half of 1997. One specific example of a plant modification was selected from each of the nuclear power plant sites to provide a basis for the comparison. The report gives an account of the methodology used, a description of the plant modification projects, impressions from the interviews, potential problem areas and suggestions for possible improvements. (orig.)

  10. Area 5 Radioactive Waste Management Site Safety Assessment Document

    International Nuclear Information System (INIS)

    Horton, K.K.; Kendall, E.W.; Brown, J.J.

    1980-02-01

    The Area 5 Radioactive Waste Management Safety Assessment Document evaluates site characteristics, facilities and operating practices which contribute to the safe handling and storage/disposal of radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. Also considered, as a separate section, are facilities and operating practices such as monitoring; storage/disposal criteria; site maintenance, equipment, and support; transportation and waste handling; and others which are adequate for the safe handling and storage/disposal of radioactive wastes. In conclusion, the Area 5 Radioactive Waste Management Site is suitable for radioactive waste handling and storage/disposal for a maximum of twenty more years at the present rate of utilization

  11. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  12. A study to develop the domestic functional requirements of the specific safety systems of CANDU

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Woong [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Lee, Jae Young; Park, Kun Chul [Handong Global Univ., Pohang (Korea, Republic of)] (and others)

    2003-03-15

    The present research has been made to develop and review critically the functional requirements of the specific safety systems of CANDU such as SDS-1, SDS2, ECCS, and containment. Based on R documents for this, a systematic study was made to develop the domestic regulation statements. Also, the conventional laws are carefully reviewed to see the compatibility to CANDU. Also, the safety assessment method for CANDU was studied by reviewing C documents and recommendation of IAEA. Through the present works, the vague policy in the CANDU safety regulation is cleaning up in a systematic form and a new frame to measure the objective risk of nuclear power plants was developed.

  13. A study to develop the domestic functional requirements of the specific safety systems of CANDU

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Woong; Lee, Jae Young; Bang, Kwang Hyun [Handong Global Univ., Pohang (Korea, Republic of)] (and others)

    2001-03-15

    The present research has been made to develop and review critically the functional requirements of the specific safety systems of CANDU such as SOS-1, SOS-2, ECCS and containment. Based on R documents for this, a systematic study was made to develop the domestic regulation statements. Also, the conventional laws are carefully reviewed to see the compatibility to CANDU. Also, the safety assessment method for CANDU was studied by reviewing C documents and recommendation of IAEA. Through the present works, the vague policy in the CANDU safety regulation is cleaning up in a systematic form and a new frame to measure the objective risk of nuclear power plants was developed.

  14. Immunization safety review: influenza vaccines and neurological complications

    National Research Council Canada - National Science Library

    Stratton, Kathleen R

    ..., unlike other vaccines. The Immunization Safety Review committee reviewed the data on influenza vaccine and neurological conditions and concluded that the evidence favored rejection of a causal relationship...

  15. IAEA Completes First Ever Corporate Safety Review, at Czech Republic's CEZ

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency (IAEA) today completed a review of corporate safety performance at CEZ a.s., the largest national electricity company in the Czech Republic. For the first time since the Agency launched its Operational Safety Review Team (OSART) missions in 1982, the team addressed corporate aspects of a company in relation to nuclear safety. The team noted a series of good practices and proposed recommendations to strengthen some safety measures. Assembled at the request of the Government of the Czech Republic, the first ''Corporate OSART'' review, which ran from 30 September to 9 October 2013, addressed corporate aspects necessary to ensure the safe operation of the Dukovany and Temelin Nuclear Power Plants (NPPs). The mission included experts from Finland, France, Romania, USA and the IAEA. OSART services aim to improve operational safety at nuclear facilities by objectively assessing safety performance using the IAEA's Safety Standards and proposing recommendations for improvement where appropriate. The missions serve as a channel to exchange information and experience and provide Member States with good practices. A ''Corporate OSART'' is an OSART mission organized to review those centralized functions of the corporate organization of a utility with multiple nuclear plant sites and conventional plant sites that affect all the operational safety aspects of the nuclear power plants of this utility. ''OSART missions are one of the most important tools of the Agency to ensure better and wider implementation of the IAEA Safety Standards,'' said Denis Flory, Deputy Director General in the IAEA Department of Nuclear Safety and Security. ''Since 1982, we have conducted close to 200 safety review missions around the globe; however, this mission is the first of its kind because we focused on the corporate performance that is a necessity for a safe operation of NPPs,'' Flory added

  16. Documenting Quality Improvement and Patient Safety Efforts: The Quality Portfolio. A Statement from the Academic Hospitalist Taskforce

    OpenAIRE

    Taylor, Benjamin B.; Parekh, Vikas; Estrada, Carlos A.; Schleyer, Anneliese; Sharpe, Bradley

    2013-01-01

    Physicians increasingly investigate, work, and teach to improve the quality of care and safety of care delivery. The Society of General Internal Medicine Academic Hospitalist Task Force sought to develop a practical tool, the quality portfolio, to systematically document quality and safety achievements. The quality portfolio was vetted with internal and external stakeholders including national leaders in academic medicine. The portfolio was refined for implementation to include an outlined fr...

  17. SKI's and SSI's review of SKB's safety report SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Dverstorp, Bjoern; Stroemberg, Bo (and others)

    2008-03-15

    This report summarises SKI's and SSI's joint review of the Swedish Nuclear Fuel and Waste Management Co's (SKB) safety report SR-Can (SKB TR-06-09). SR-Can is the first assessment of post-closure safety for a KBS-3 spent nuclear fuel repository at the candidate sites Forsmark and Laxemar, respectively. The analysis builds on data from the initial stage of SKB's surface-based site investigations and on data from full-scale manufacturing and testing of buffer and copper canisters. SR-Can can be regarded as a preliminary version of the safety report that will be required in connection with SKB's planned licence application for a final repository in late 2009. The main purpose of the authorities' review is to provide feedback to SKB on their safety reporting as part of the pre-licensing consultation process. However, SR-Can is not part of the formal licensing process. In support of the authorities' review three international peer review teams were set up to make independent reviews of SR-Can from three perspectives, namely integration of site data, representation of the engineered barriers and safety assessment methodology, respectively. Further, several external experts and consultants have been engaged to review detailed technical and scientific issues in SR-Can. The municipalities of Oesthammar and Oskarshamn where SKB is conducting site investigations, as well NGOs involved in SKB's programme, have been invited to provide their views on SR-Can as input to the authorities' review. Finally, the authorities themselves, and with the help of consultants, have used independent models to reproduce part of SKB's calculations and to make complementary calculations. All supporting review documents are published in SKI's and SSI's report series. The main findings of the review are: -SKB's safety assessment methodology is overall in accordance with applicable regulations, but part of the methodology needs to be

  18. Safety culture in industrial radiography facility

    International Nuclear Information System (INIS)

    Vincent-Furo, Evelyn

    2015-02-01

    This project reviewed published IAEA materials and other documents on safety culture with specific references to industrial radiography. Safety culture requires all duties important to safety to be carried out correctly, with alertness, due thought and full knowledge, sound judgment and a proper sense of accountability. The development and maintenance of safety culture in an operating organization has to cover management systems, policies, responsibilities, procedures and organizational arrangements. The essence is to control radiation hazard, optimize radiation protection to prevent or reduce exposures and mitigate the consequences of accidents and incidents. To achieve a high degree of safety culture appropriate national and international infrastructure should exist to ensure effective training of workers and management system that supports commitment to safety culture at all level of the organization; management, managers and workforce. The result of the review revealed that all accidents in industrial radiography facilities were due to poor safety culture practices including inadequate regulatory control oversight. Some recommendations are provided and if implemented could improve safety culture leading to good safety performance which will significantly reduce accidents and their consequences in industrial radiography. These examples call for a review of safety culture in Industrial radiography. (au)

  19. Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    1999-01-01

    The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; and protect human health and the environment

  20. Prospects for nuclear safety research

    Energy Technology Data Exchange (ETDEWEB)

    Beckjord, E.S.

    1995-04-01

    This document is the text of a paper presented by Eric S. Beckjord (Director, Nuclear Regulatory Research/NRC) at the 22nd Water Reactor Safety Meeting in Bethesda, MD in October 1994. The following topics are briefly reviewed: (1) Reactor vessel research, (2) Probabilistic risk assessment, (3) Direct containment heating, (4) Advanced LWR research, (5) Nuclear energy prospects in the US, and (6) Future nuclear safety research. Subtopics within the last category include economics, waste disposal, and health and safety.

  1. Integrated plant safety assessment. Systematic Evaluation Program. La Crosse Boiling Water Reactor. Dairyland Power Cooperative, Docket No. 50-409. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the La Crosse Boiling Water Reactor, operated by Dairyland Power Cooperative. The La Crosse plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  2. Integrated Plant Safety Assessment: Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  3. Integrated Plant Safety Assessment, Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Draft report

    International Nuclear Information System (INIS)

    1983-02-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  4. Integrated Plant Safety Assessment: Systematic Evaluation Program. Haddam Neck Plant, Connecticut Yankee Atomic Power Company, Docket No. 50-213. Final report

    International Nuclear Information System (INIS)

    1983-01-01

    The Systematic Evaluation Progam was initiated in February 1977 by the US Nuclear Regulatory Commission review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with curent licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Haddam Neck Plant, operated by Connecticut Yankee Atomic Power Company. The Haddam Neck Plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  5. Towards an International Approach to Nuclear Safety

    International Nuclear Information System (INIS)

    Tomihiro Taniguchi

    2006-01-01

    This document presents in a series of transparencies the different activities of the IAEA: Introduction of International Atomic Energy Agency, Changing world, Changing Technology, Changing Global Security, Developing Innovative Nuclear Energy Systems, Global Nuclear Safety Regime, IAEA Safety Standards: Hierarchy - Global Reference for Striving for Excellence, IAEA Safety Reviews and Services: Integrated Safety Approach, Global Knowledge Network - Asian Nuclear Safety Network, Safety Issues and Challenges, Synergy between Safety and Security, Recent Developments: Safety and Security of Radioactive Sources, Convention on Physical Protection of Nuclear Material (CPPNM), Incident and Emergency Preparedness and Response, Holistic Approach for Safety and Security, Sustainable Development. (J.S.)

  6. Surgical Safety Training of World Health Organization Initiatives.

    Science.gov (United States)

    Davis, Christopher R; Bates, Anthony S; Toll, Edward C; Cole, Matthew; Smith, Frank C T; Stark, Michael

    2014-01-01

    Undergraduate training in surgical safety is essential to maximize patient safety. This national review quantified undergraduate surgical safety training. Training of 2 international safety initiatives was quantified: (1) World Health Organization (WHO) "Guidelines for Safe Surgery" and (2) Department of Health (DoH) "Principles of the Productive Operating Theatre." Also, 13 additional safety skills were quantified. Data were analyzed using Mann-Whitney U tests. In all, 23 universities entered the study (71.9% response). Safety skills from WHO and DoH documents were formally taught in 4 UK medical schools (17.4%). Individual components of the documents were taught more frequently (47.6%). Half (50.9%) of the additional safety skills identified were taught. Surgical societies supplemented safety training, although the total amount of training provided was less than that in university curricula (P < .0001). Surgical safety training is inadequate in UK medical schools. To protect patients and maximize safety, a national undergraduate safety curriculum is recommended. © 2013 by the American College of Medical Quality.

  7. RADWASS update. Radioactive Waste Safety Standards Programme

    International Nuclear Information System (INIS)

    Delattre, D.

    2000-01-01

    By the late 1980s, the issue of radioactive wastes and their management was becoming increasingly politically important. The IAEA responded by establishing a high profile family of safety standards, the Radioactive Waste Safety Standards (RADWASS). By this means, the IAEA intended to draw attention to the fact that well-established procedures for the safe management of radioactive wastes already were in place. The programme was intended to establish an ordered structure for safety documents on waste management and to ensure comprehensive coverage of all relevant subject areas. RADWASS documents are categorized under four subject areas - discharges, predisposal, disposal, and environmental restoration. The programme is overseen through a formalized review and approval mechanism that was established in 1996 for all safety standards activities. The Waste Safety Standards Committee (WASSC) is a standing body of senior regulatory officials with technical expertise in radioactive waste safety. To date, three Safety Requirements and seven Safety Guides have been issued

  8. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    KRIPPS, L.J.

    2005-03-03

    This document describes the qualitative evaluation of frequency and consequences for DST and SST representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant structures, systems and components (SSCs) and/or technical safety requirements (TSRs) were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support WP-13033, Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  9. Statin Therapy: Review of Safety and Potential Side Effects.

    Science.gov (United States)

    Ramkumar, Satish; Raghunath, Ajay; Raghunath, Sudhakshini

    2016-11-01

    Hydroxymethyl glutaryl coenzyme A reductase inhibitors, commonly called statins, are some of the most commonly prescribed medications worldwide. Evidence suggests that statin therapy has significant mortality and morbidity benefit for both primary and secondary prevention from cardiovascular disease. Nonetheless, concern has been expressed regarding the adverse effects of long term statin use. The purpose of this article was to review the current medical literature regarding the safety of statins. Major trials and review articles on the safety of statins were identified in a search of the MEDLINE database from 1980 to 2016, which was limited to English articles. Myalgia is the most common side effect of statin use, with documented rates from 1-10%. Rhabdomyolysis is the most serious adverse effect from statin use, though it occurs quite rarely (less than 0.1%). The most common risk factors for statin-related myopathy include hypothyroidism, polypharmacy and alcohol abuse. Derangement in liver function tests is common, affecting up to 1% of patients; however, the clinical significance of this is unknown. Some statin drugs are potentially diabetogenic and the risk appears to increase in those patients on higher doses. Pitavastatin has not been associated with increased risk of diabetes. Statins have not been proven to increase the risk of malignancy, dementia, mood disorders or acute interstitial nephritis. However, statins do have multiple drug interactions, primarily those which interact with the cytochrome p450 enzyme group. Overall, statin drugs appear to be safe for use in the vast majority of patients. However, patients with multiple medical co-morbidities are at increased risk of adverse effects from long-term statin use.

  10. Patient safety culture in care homes for older people: a scoping review

    Directory of Open Access Journals (Sweden)

    Emily Gartshore

    2017-11-01

    Full Text Available Abstract Background In recent years, there has been an increasing focus on the role of safety culture in preventing incidents such as medication errors and falls. However, research and developments in safety culture has predominantly taken place in hospital settings, with relatively less attention given to establishing a safety culture in care homes. Despite safety culture being accepted as an important quality indicator across all health and social care settings, the understanding of culture within social care settings remains far less developed than within hospitals. It is therefore important that the existing evidence base is gathered and reviewed in order to understand safety culture in care homes. Methods A scoping review was undertaken to describe the availability of evidence related to care homes’ patient safety culture, what these studies focused on, and identify any knowledge gaps within the existing literature. Included papers were each reviewed by two authors for eligibility and to draw out information relevant to the scoping review. Results Twenty-four empirical papers and one literature review were included within the scoping review. The collective evidence demonstrated that safety culture research is largely based in the USA, within Nursing Homes rather than Residential Home settings. Moreover, the scoping review revealed that empirical evidence has predominantly used quantitative measures, and therefore the deeper levels of culture have not been captured in the evidence base. Conclusions Safety culture in care homes is a topic that has not been extensively researched. The review highlights a number of key gaps in the evidence base, which future research into safety culture in care home should attempt to address.

  11. Development and Application of Level 2 Probabilistic Safety Assessment for Nuclear Power Plants. Specific Safety Guide

    International Nuclear Information System (INIS)

    2010-01-01

    The objective of this Safety Guide is to provide recommendations for meeting the IAEA safety requirements in performing or managing a level 2 probabilistic safety assessment (PSA) project for a nuclear power plant; thus it complements the Safety Guide on level 1 PSA. One of the aims of this Safety Guide is to promote a standard framework, standard terms and a standard set of documents for level 2 PSAs to facilitate regulatory and external peer review of their results. It describes all elements of the level 2 PSA that need to be carried out if the starting point is a fully comprehensive level 1 PSA. Contents: 1. Introduction; 2. PSA project management and organization; 3. Identification of design aspects important to severe accidents and acquisition of information; 4. Interface with level 1 PSA: Grouping of sequences; 5. Accident progression and containment analysis; 6. Source terms for severe accidents; 7. Documentation of the analysis: Presentation and interpretation of results; 8. Use and applications of the PSA; Annex I: Example of a typical schedule for a level 2 PSA; Annex II: Computer codes for simulation of severe accidents; Annex III: Sample outline of documentation for a level 2 PSA study.

  12. Intergrated plant safety assessment. Systematic evaluation program. Palisades plant, Consumers Power Company, Docket No. 50-255. Final report

    International Nuclear Information System (INIS)

    1982-10-01

    The Nuclear Regulatory Commission (NRC) has published its Final Integrated Plant Safety Assessment Report (IPSAR) (NUREG-0820), under the scope of the Systematic Evaluation Program (SEP), for Consumers Power Company's Palisades Plant located in Covert, Van Buren County, Michigan. The SEP was initiated by the NRC to review the design of older operating nuclear reactor plants to reconfirm and document their safety. This report documents the review completed under the SEP for the Palisades Plant. The review has provided for (1) as assessment of the significance of differences between current technical positions on selected safety issues and those that existed when the Palisades Plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when all supplements to the Final IPSAR and the Safety Evaluation Report for converting the license from a provisional to a full-term license have been issued. The report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in April 1982

  13. IAEA Completes Safety Review at Czech Nuclear Power Plant

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of nuclear safety experts, led by the International Atomic Energy Agency (IAEA), today completed a review of safety practices at Temelin Nuclear Power Station in the Czech Republic. The team highlighted the Power Plant's good practices and also recommended improvements to some safety measures. At the request of the Government of the Czech Republic, the IAEA assembled a team of nuclear installation safety experts to send an Operational Safety Review Team (OSART) to the Power Plant, and the mission was conducted from 5 to 22 November 2012. The team was comprised of experts from Brazil, Hungary, Slovakia, South Africa, Sweden, Ukraine and the United Kingdom. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the Plant's overall safety status. The team at Temelin conducted an in-depth review of the functions essential to the safe operation of the Power Plant, which are under the responsibility of the site's management. The review covered the areas of management, organization and administration; operations; maintenance; technical support; operating experience; radiation protection; chemistry; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of potential application elsewhere. Examples include the following: - The Power Plant has adopted effective computer software to improve the efficiency of the plant to prepare and isolate equipment for maintenance; - The Power Plant undertakes measures to control precisely the chemical parameters that limit corrosion in the reactor's coolant system, which in turn reduce radiation exposure to the workforce; and - The Temelin

  14. Integrated program of using of Probabilistic Safety Analysis in Spain

    International Nuclear Information System (INIS)

    1998-01-01

    Since 25 June 1986, when the CSN (Nuclear Safety Conseil) approve the Integrated Program of Probabilistic Safety Analysis, this program has articulated the main activities of CSN. This document summarize the activities developed during these years and reviews the Integrated programme

  15. Adolescent bariatric surgery: a systematic review of recommendation documents.

    Science.gov (United States)

    Childerhose, Janet E; Alsamawi, Amal; Mehta, Tanvi; Smith, Judith E; Woolford, Susan; Tarini, Beth A

    2017-10-01

    Bariatric surgery has been performed on adolescents since the 1970s, but little is known about the guidance offered to providers in recommendation documents published in the United States. A systematic review was conducted to generate a complete record of all US recommendation documents and describe variability across the documents. This study had 3 aims: to identify the developers, examine selection criteria, and document reasons why developers have recommended this intervention for adolescents. Four databases (MEDLINE, National Guidelines Clearinghouse, Trip, and Embase) ertr searched, followed by a hand search. Documents were eligible for inclusion if they satisfied 5 criteria: written in the English language; developed and published by a US organization; comprised a clinical practice guideline, position statement, or consensus statement; offered a minimum 1-sentence recommendation on bariatric surgery for the treatment of obesity or related co-morbidities; and offered a minimum 1-sentence recommendation on bariatric surgery for children, adolescents, or both. No date limits were applied. Sixteen recommendation documents published between 1991 and 2013 met our inclusion criteria: 10 clinical practice guidelines, 4 position statements, and 2 consensus statements. Nine were produced by medical organizations, 3 by surgical organizations, and 4 by public health/governmental bodies. One document recommended against bariatric surgery for minors, and 15 endorsed the intervention for this population. Body mass index (a measure of obesity calculated by dividing weight in kilograms by the square of height in meters) thresholds were the selection criteria most often provided. Minimum age varied widely. Of the 15 endorsing documents, 10 provided a reason for performing bariatric surgery on minors, most often to treat obesity-related co-morbidities that threaten the health of the adolescent. We make 3 suggestions to improve the quality of future recommendation documents

  16. Existing and future international standards for the safety of radioactive waste disposal

    International Nuclear Information System (INIS)

    Linsley, G.

    1999-01-01

    In this paper the essential features of the current international safety standards are summarised and the issues being raised for inclusion in future standards are discussed. The safety standards of the IAEA are used as the basis for the review and discussion. The IAEA has established a process for establishing international standards of safety for radioactive waste management through its Radioactive Waste Safety Standards (RADWASS) programme. The RADWASS documents are approved by a comprehensive process involving regulatory and other experts from all concerned IAEA Member States. A system of committees for approving the IAEAs safety standards has been established. For radioactive waste safety the committee for review and approval is the Waste Safety Standards Advisory Committee (WASSAC). In 1995 the IAEA published 'The Principles of Radioactive Waste Management' as the top level document in the RADWASS programme. The report sets out the basis principles which most experts believe are fundamental to the safe management of radioactive wastes

  17. Independent peer review of nuclear safety computer codes

    International Nuclear Information System (INIS)

    Boyack, B.E.; Jenks, R.P.

    1993-01-01

    A structured, independent computer code peer-review process has been developed to assist the US Nuclear Regulatory Commission (NRC) and the US Department of Energy in their nuclear safety missions. This paper describes a structured process of independent code peer review, benefits associated with a code-independent peer review, as well as the authors' recent peer-review experience. The NRC adheres to the principle that safety of plant design, construction, and operation are the responsibility of the licensee. Nevertheless, NRC staff must have the ability to independently assess plant designs and safety analyses submitted by license applicants. According to Ref. 1, open-quotes this requires that a sound understanding be obtained of the important physical phenomena that may occur during transients in operating power plants.close quotes The NRC concluded that computer codes are the principal products to open-quotes understand and predict plant response to deviations from normal operating conditionsclose quotes and has developed several codes for that purpose. However, codes cannot be used blindly; they must be assessed and found adequate for the purposes they are intended. A key part of the qualification process can be accomplished through code peer reviews; this approach has been adopted by the NRC

  18. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  19. Nuclear Safety Review for the Year 2005

    International Nuclear Information System (INIS)

    2006-01-01

    view of waste management and disposal that takes into account all factors and considers the entire life cycle. There is also increasing interest in multinational approaches and solutions. More Member States now recognize that decommissioning will be required for all facilities that have used or produced radioactive material. In 2005, the Chernobyl Forum completed its work and issued its reports as consensus documents. In addition to assessing the health and environmental consequences of the 1986 Chernobyl accident, the Forum provided recommendations for future activities. There is a need to further harmonize and make compatible international emergency assistance and communications to facilitate more effective and timely responses. This will involve enhancing emergency preparedness programmes, including modernizing emergency management centres and conducting broader emergency exercises. Expeditious transmission of accurate information in the case of an emergency to neighbouring and potentially affected countries continues to be a challenge. Continuous effort to improve safety is the key to maintaining a high level of safety. In light of the strong performance already achieved, the future challenge will be to maintain this momentum. Safety assessments and international peer reviews must continue to play an important role in assessing and improving safety levels in all areas. It is also essential that more proactive and integrated approaches to safety become the norm. Safety and security synergies are being better explored and used for the common goal of protecting people and the environment. Before implementing safety or security measures, consideration must be given to the impact of such measures on each other.

  20. Innovative safety features of the modular HTGR

    International Nuclear Information System (INIS)

    Silady, F.A.; Simon, W.A.

    1992-04-01

    In this document the innovative safety features of the MHTGR are reviewed by examining the safety response to events challenging the functions relied on to retain radionuclides within the coated fuel particles. A broad range of challenges to core heat removal are examined, including a loss of helium pressure and a simultaneous loss of forced cool of the core

  1. Authorization Basis Safety Classification of Transfer Bay Bridge Crane at the 105-K Basins

    International Nuclear Information System (INIS)

    CHAFFEE, G.A.

    2000-01-01

    This supporting document provides the bases for the safety classification for the K Basin transfer bay bridge crane and the bases for the Structures, Systems, and Components (SSC) safety classification. A table is presented that delineates the safety significant components. This safety classification is based on a review of the Authorization Basis (AB). This Authorization Basis review was performed regarding AB and design baseline issues. The primary issues are: (1) What is the AB for the safety classification of the transfer bay bridge crane? (2) What does the SSC safety classification ''Safety Significant'' or ''Safety Significant for Design Only'' mean for design requirements and quality requirements for procurement, installation and maintenance (including replacement of parts) activities for the crane during its expected life time? The AB information on the crane was identified based on review of Department of Energy--Richland Office (RL) and Spent Nuclear Fuel (SNF) Project correspondence, K Basin Safety Analysis Report (SAR) and RL Safety Evaluation Reports (SERs) of SNF Project SAR submittals. The relevant correspondence, actions and activities taken and substantive directions or conclusions of these documents are provided in Appendix A

  2. A review of technology and trends in document delivery services

    Energy Technology Data Exchange (ETDEWEB)

    Bourne, C P [DIALOG Information Services, Inc., Palo Alto, CA (United States)

    1990-05-01

    This paper reviews the major lines of technical development being pursued to extend or replace traditional inter-library loan and photocopy service and to facilitate the delivery of source documents to individual end users. Examples of technical approaches discussed are: (1) the inclusion of full text and image data in central online systems; (2) image workstations such as the ADONIS and UMI systems; and (3) the use of electronic networks for document ordering and delivery. Some consideration is given to the policy implications for libraries and information systems. (author). 11 tabs.

  3. A review of technology and trends in document delivery services

    International Nuclear Information System (INIS)

    Bourne, C.P.

    1990-05-01

    This paper reviews the major lines of technical development being pursued to extend or replace traditional inter-library loan and photocopy service and to facilitate the delivery of source documents to individual end users. Examples of technical approaches discussed are: 1) the inclusion of full text and image data in central online systems; 2) image workstations such as the ADONIS and UMI systems; and 3) the use of electronic networks for document ordering and delivery. Some consideration is given to the policy implications for libraries and information systems. (author). 11 tabs

  4. Nuclear Installation Safety: General Observations and Trends from IAEA Peer Reviews

    International Nuclear Information System (INIS)

    Rzentkowski, G.

    2016-01-01

    The Safety Review Services (SRSs) for nuclear installations address the needs of Member States at all stages of installations’ lifecycle. SRSs are based on the IAEA Safety Standards and are provided on Member States’ request to peer review national regulatory frameworks and safety provisions for nuclear installations. They result in recommendations and suggestions to improve national regulations and operational safety, and serve to exert peer pressure to ensure that that every Member State with nuclear installations recognizes its safety responsibility and the need to comply with the IAEA Safety Standards. This presentation provides an overview of SRSs for Nuclear Installations, including their structure and main subject areas. The presentation also summarizes general findings and trends which clearly demonstrate that there is continuous improvement in regulation of nuclear installations and in safety of their operation. Nevertheless, there is the need to further enhance the efficiency and effectiveness of SRSs through review of the overall governance model and service delivery to better serve the needs of Member States. The presentation points out some areas of improvements which have already been implemented or are being considered for implementation. Just as important, SRSs are conducted by teams of experts from around the world to strengthening international cooperation, ensure diversity and impartiality, and improve the overall quality of the safety review being conducted. The review team members are also provided with the opportunity for mutual learning and sharing good practices among themselves and with the Member State undergoing the review. As a result, SRAs play an important role in a quest to harmonize regulatory requirements and approaches globally. (author)

  5. Safety Experts Complete IAEA Nuclear Regulatory Review of the United States

    International Nuclear Information System (INIS)

    2010-01-01

    nuclear regulators. Such missions also help to build mutual confidence between States in the field of nuclear regulation.'' The IRRS team identified several strengths in the U.S. regulatory system, including: The achievement of a mature safety regulation system that meets its clearly defined strategic goals, organizational values, and the NRC's principles of good regulation; A transparent licensing process that accepts input from public citizens and environmental reviews, and ensures that key documents are publicly available; and A high level of human resource development, due to rigorous staff training at all levels and efforts to ensure long-term knowledge management. The IRRS team also made suggestions to improve the overall performance of the U.S. regulatory system. Examples include: The NRC should consider increasing its effort to use IAEA safety standards in its own regulations; The NRC should develop a fully integrated management system that will coordinate a number of programs and processes that are currently not fully integrated; and The NRC should incorporate lessons learned by the practice of other nations using licensee-conducted periodic safety reviews as a way to improve the NRC's assessment process. IAEA Deputy Director General Denis Flory said, ''I have been impressed by the worldwide interest and international participation in the IAEA's IRRS program. I appreciate the U.S. willingness to invite this mission and demonstrate the value of this service for all nations.'' General information about the Integrated Regulatory Review Service (IRRS) and previous missions can be found on the IAEA website. (IAEA)

  6. LNG Safety Assessment Evaluation Methods

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Angela Christine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  7. Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report

    Energy Technology Data Exchange (ETDEWEB)

    PARSONS, J.E.

    1999-10-28

    The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; and protect human health and the environment.

  8. DART - for design basis justification and safety related information management

    International Nuclear Information System (INIS)

    Billington, A.; Blondiaux, P.; Boucau, J.; Cantineau, B.; Doumont, C.; Mared, A.

    2000-01-01

    DART is the acronym for Design Analysis Re-engineering Tool. It embodies a systematic and integrated approach to NPP safety re-assessment and configuration management, that makes use of Reverse Failure Mode and Effect Analysis in conjunction with a state-of-the-art relational database and a standardized data format, to permit long-term management of plant safety related information. The plant design is reviewed in a step-by-step logical fashion by constructing fault trees that identify the link between undesired consequences and their causes. Each failure cause identified in a fault tree is addressed by defining functional requirements, which are in turn addressed by documenting the specific manner in which the plant complies with the requirement. The database can be used to generate up-to-date plant safety related documents, including: SAR, Systems Descriptions, Technical Specifications and plant procedures. The approach is open-minded by nature and therefore is not regulatory driven, however the plant licensing basis will also be reviewed and documented within the same database such that a Regulatory Conformance Program may be integrated with the other safety documentation. This methodology can thus reconstitute the plant design bases in a comprehensive and systematic way, while allowing to uncover weaknesses in design. The original feature of the DART methodology is that it links all the safety related documents together, facilitating the evaluation of the safety impact resulting from any plant modification. Due to its capability to retrieve the basic justifications of the plant design, it is also a useful tool for training the young generation of plant personnel. The DART methodology has been developed for application to units 2, 3 and 4 at Vattenfall's Ringhals site in Sweden. It may be applied to any nuclear power plant or industrial facility where public safety is a concern. (author)

  9. DART - for design basis justification and safety related information management

    International Nuclear Information System (INIS)

    Billington, A.; Blondiaux, B.; Boucau, J.; Cantineau, B.; Mared, A.

    2001-01-01

    DART is the acronym for Design Analysis Re-Engineering Tool. It embodies a systematic and integrated approach to NPP safety re-assessment and configuration management, that makes use of Reverse Failure Mode and Effect Analysis in conjunction with a state-of-the-art relational database and a standardized data format, to permit long-term management of plant safety related information. The plant design is reviewed in a step-by-step logical fashion by constructing fault trees that identify the link between undesired consequences and their causes. Each failure cause identified in a fault tree is addressed by defining functional requirements, which are in turn addressed by documenting the specific manner in which the plant complies with the requirement. The database can then be used to generate up-to-date plant safety related documents, including: SAR, Systems Descriptions, Technical Specifications and plant procedures. The approach is open-minded by nature and therefore is not regulatory driven, however the plant licensing basis will also be reviewed and documented within the same database such that a Regulatory Conformance Program may be integrated with the other safety documentation. This methodology can thus reconstitute the plant design bases in a comprehensive and systematic way, while allowing to uncover weaknesses in design. The original feature of the DART methodology is that it links all the safety related documents together, facilitating the evaluation of the safety impact resulting from any plant modification. Due to its capability to retrieve the basic justifications of the plant design, it is also a useful tool for training the young generation of plant personnel. The DART methodology has been developed for application to units 2, 3 and 4 at Vattenfall's Ringhals site in Sweden. It may be applied to any nuclear power plant or industrial facility where public safety is a concern. (author)

  10. IAEA codes and guides for safety of nuclear power plants

    International Nuclear Information System (INIS)

    Raisic, N.

    1980-01-01

    The objectives and scope of the Agency's programme of nuclear safety standards are described and the role of these documents in regulation of nuclear power im Member States is discussed. For each of the five areas of safety standards development, i.e. siting, design, operation, quality assurance and governmental organization, a set of principles underlying requirements and recommendations contained in the Code of Practice and Safety Guides will be presented. Safety Guides in each of the five areas will be reviewed in respect of the scope and content. A consideration will be given to the future development of the safety standards and to the revision and updating of the published documents. (orig./RW)

  11. Quality assurance application in the documentation of nuclear research reactor

    International Nuclear Information System (INIS)

    Nababan, N.

    1999-01-01

    For each nuclear research reactor a document control system should be established and should be provide for preparation, review, approval, issuance, distribution, revision and validation (where appropriate) of documents essential to the management, performance and verification of work. In the document control system the responsibilities for each participating organization or individual should be defined in writing. The types of document include, but are not limited to document comprising the QA program, safety requirements, maintenance and operating procedures, inspection instructions, inspection and test reports, assessment reports, drawings, data files, calculations, specifications, computer codes, purchase orders and related documents, vendor supplied documents and work instruction. Management should identify the need for documents and should provide guidance to the organizations and people preparing them. The guidance should cover the status, scope and contents and the policies, standards and codes witch apply. It should also explain the need for feedback of experience. Plant modification or the results of assessments could also give rise to the need for a new document

  12. Organization and conduct of IAEA fire safety reviews at nuclear power plants

    International Nuclear Information System (INIS)

    1998-01-01

    The importance of fire safety in the safe and productive operation of nuclear power plants is recognized worldwide. Lessons learned from experience in nuclear power plants indicate that fire poses a real threat to nuclear safety and that its significance extends far beyond the scope of a conventional fire hazard. With a growing understanding of the close correlation between the fire hazard in nuclear power plants and nuclear safety, backfitting for fire safety has become necessary for a number of operating plants. However, it has been recognized that the expertise necessary for a systematic independent assessment of fire safety of a NPP may not always be available to a number of Member States. In order to assist in enhancing fire safety, the IAEA has already started to offer various services to Member States in the area of fire safety. At the request of a Member State, the IAEA may provide a team of experts to conduct fire safety reviews of varying scope to evaluate the adequacy of fire safety at a specific nuclear power plant during various phases such as construction, operation and decommissioning. The IAEA nuclear safety publications related to fire protection and fire safety form a common basis for these reviews. This report provides guidance for the experts involved in the organization and conduct of fire safety review services to ensure consistency and comprehensiveness of the reviews

  13. Nulcear Safety: Technical progress review, October--December 1988

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1988-01-01

    Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  14. International Nuclear Safety Experts Conclude IAEA Peer Review of Swiss Regulatory Framework

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: A team of international nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the regulatory framework for nuclear safety in Switzerland. The Integrated Regulatory Review Service (IRRS) mission noted good practices in the Swiss system and also made recommendations for the nation's nuclear regulatory authority, the Swiss Federal Nuclear Safety Inspectorate (ENSI). ''Our team developed a good impression of the independent Swiss regulator - ENSI - and the team considered that ENSI deserves particular credit for its actions to improve Swiss safety capability following this year's nuclear accident in Japan,'' said IRRS Team Leader Jean-Christophe Niel of France. The mission's scope covered the Swiss nuclear regulatory framework for all types of nuclear-related activities regulated by ENSI. The mission was conducted from 20 November to 2 December, mainly at ENSI headquarters in Brugg. The team held extensive discussions with ENSI staff and visited many Swiss nuclear facilities. IRRS missions are peer reviews, not inspections or audits, and are conducted at the request of host nations. For the Swiss review, the IAEA assembled a team of 19 international experts from 14 countries. The experts came from Belgium, Brazil, the Czech Republic, Finland, France, Germany, Italy, the Republic of Korea, Norway, Russia, Slovakia, Sweden, the United Kingdom, and the United States. ''The findings of the IRRS mission will help us to further improve our work. That is part of our safety culture,'' said ENSI Director General Hans Wanner. ''As Switzerland argued at international nuclear safety meetings this year for a strengthening of the international monitoring of nuclear power, we will take action to fulfil the recommendations.'' The IRRS team highlighted several good practices of the Swiss regulatory system, including the following: ENSI requires Swiss nuclear operators to back-fit their facilities by continuously upgrading

  15. Development of Onsite Transportation Safety Documents for Nevada Test Site

    International Nuclear Information System (INIS)

    Frank Hand; Willard Thomas; Frank Sciacca; Manny Negrete; Susan Kelley

    2008-01-01

    Department of Energy (DOE) Orders require each DOE site to develop onsite transportation safety documents (OTSDs). The Nevada Test Site approach divided all onsite transfers into two groups with each group covered by a standalone OTSD identified as Non-Nuclear and Nuclear. The Non-Nuclear transfers involve all radioactive hazardous material in less than Hazard Category (HC)-3 quantities and all chemically hazardous materials. The Nuclear transfers involve all radioactive material equal to or greater than HC-3 quantities and radioactive material mated with high explosives regardless of quantity. Both OTSDs comply with DOE O 460.1B requirements. The Nuclear OTSD also complies with DOE O 461.1A requirements and includes a DOE-STD-3009 approach to hazard analysis (HA) and accident analysis as needed. All Nuclear OTSD proposed transfers were determined to be non-equivalent and a methodology was developed to determine if 'equivalent safety' to a fully compliant Department of Transportation (DOT) transfer was achieved. For each HA scenario, three hypothetical transfers were evaluated: a DOT-compliant, uncontrolled, and controlled transfer. Equivalent safety is demonstrated when the risk level for each controlled transfer is equal to or less than the corresponding DOT-compliant transfer risk level. In this comparison the typical DOE-STD-3009 risk matrix was modified to reflect transportation requirements. Design basis conditions (DBCs) were developed for each non-equivalent transfer. Initial DBCs were based solely upon the amount of material present. Route-, transfer-, and site-specific conditions were evaluated and the initial DBCs revised as needed. Final DBCs were evaluated for each transfer's packaging and its contents

  16. International Expert Team Concludes IAEA Peer Review of Slovakia's Regulatory Framework for Nuclear Safety

    International Nuclear Information System (INIS)

    2012-01-01

    that consideration of these would enhance the overall performance of the regulatory system: Coordination and allocation of responsibilities among State Authorities in the area of safety and improvement of planning and coordination of their activities; The development of a national policy and strategy document for nuclear safety; and A unified national radiation monitoring system to ensure its results could be used by competent authorities in normal situations as well as during emergencies. In a preliminary report, the IAEA has conveyed the team's main conclusions to UJD SR. A final report will be submitted to the Government of Slovakia in about three months. UJD SR has informed the team that the final report will be publicly available. The IAEA encourages nations to invite a follow-up IRRS mission about two years after the mission has been completed. Background. The IRRS mission to Slovakia was conducted from 28 May to 7 June 2012, mainly in Bratislava. The IRRS team carried out a review of nuclear legal and regulatory framework for nuclear safety. Special attention was given to the review of the regulatory implications for Slovakia of the TEPCO Fukushima Daiichi accident. The review addressed all facilities regulated by UJD SR including nine nuclear power units, as well as spent fuel and waste management facilities. The IRRS mission did not include a comprehensive review of the national regulatory infrastructure for radiation safety of Slovakia, which is planned to be covered in the IRRS follow-up mission. Team experts came from twelve different countries: Belgium, Brazil, Czech Republic, Finland, France, Hungary, Romania, Slovenia, South Korea, Sweden, Ukraine and United Kingdom. The IRRS team consisted also of 6 IAEA staff members. Quick Facts. Slovakia has nine nuclear power reactors at two sites (Bohunice, Mochovce): 3 units are in decommissioning, four units are in operation and two units under construction. Slovakia has no other fuel cycle facilities or research

  17. CERN's new safety policy

    CERN Multimedia

    2014-01-01

    The documents below, published on 29 September 2014 on the HSE website, together replace the document SAPOCO 42 as well as Safety Codes A1, A5, A9, A10, which are no longer in force. As from the publication date of these documents any reference made to the document SAPOCO 42 or to Safety Codes A1, A5, A9 and A10 in contractual documents or CERN rules and regulations shall be deemed to constitute a reference to the corresponding provisions of the documents listed below.   "The CERN Safety Policy" "Safety Regulation SR-SO - Responsibilities and organisational structure in matters of Safety at CERN" "General Safety Instruction GSI-SO-1 - Departmental Safety Officer (DSO)" "General Safety Instruction GSI-SO-2 - Territorial Safety Officer (TSO)" "General Safety Instruction GSI-SO-3 - Safety Linkperson (SLP)" "General Safety Instruction GSI-SO-4 - Large Experiment Group Leader In Matters of Safety (LEXGLI...

  18. Assessment by peer review of the effectiveness of a regulatory programme for radiation safety. Interim report for comment; Evaluacion mediante examen por pares de la efectividad de un programa regulador para la seguridad radiologica. Informe provisional para formular comentarios

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    This document covers assessment of those aspects of a radiation protection and safety infrastructure that are implemented by the Regulatory Authority for radiation sources and practices using such sources and necessarily includes those ancillary technical services, such as dosimetry services, which directly affect the ability of the Regulatory Authority to discharge its responsibilities. The focus of the guidance in this TECDOC is on assessment of a regulatory programme intended to implement the BSS. The BSS address transportation and waste safety mainly by reference to other IAEA documents. When conducting an assessment, the Review Team members should be aware of the latest IAEA documents (or similar national documents) concerning transportation and waste safety and, if appropriate, nuclear safety, and take them into account to the extent applicable when assessing the effectiveness of the regulatory programme governing radiation protection and safety of radiation source practices in a particular State.

  19. Community Documentation Centre on Industrial Risk. Volume 3 (consolidated volume containing also content of vol. 1 and 2)

    International Nuclear Information System (INIS)

    1990-09-01

    The Directorate-General for Environment, Nuclear Safety and Civil Protection of the Commission of the European Communities is responsible for the effective and harmonized implementation of the Directive 82/501/EEC on the major-accident hazards of certain industrial activities. To this end, the Commission, in collaboration with the Committee of Competent Authorities responsible for the implementation of this Directive in the twelve Member States, carries out a whole range of activities. One of the most essential areas for action identified was the need for a systematic diffusion of information concerning the practical implementation of the Directive in the Member States, including the technical rules and guidelines applied, the safety practices and the lessons learnt from major accidents. Therefore, the Commission decided to set up a Community Documentation Centre on Industrial Risks (CDCIR). This Documentation Centre is run by the European Commission, Joint Research Centre, Institute for Systems Engineering and Informatics (ISEI), at Ispra, Italy, among its support activities on the implementation of the Directive. The Documentation Centre will collect, classify and review technical rules, guidelines and documents concerning the requirements of the Directive, as well as the safety of industrial installations produced by governments, administrative, scientific or technical bodies, national or international organizations and industrial or professional associations. Documents on major accidents in the form of reports, videotapes will also be collected and reviewed. The Centre is accessible to interested visitors, documents which are not covered by copyright and are not restricted can be obtained from the Documentation Centre on request. Periodical volumes which will feature the inventory, including abstracts, of the collected material will be published and made available to all interested parties. The Centre will also publish documents devoted to compare existing

  20. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  1. Plutonium Finishing Plant safety evaluation report

    International Nuclear Information System (INIS)

    1995-01-01

    The Plutonium Finishing Plant (PFP) previously known as the Plutonium Process and Storage Facility, or Z-Plant, was built and put into operation in 1949. Since 1949 PFP has been used for various processing missions, including plutonium purification, oxide production, metal production, parts fabrication, plutonium recovery, and the recovery of americium (Am-241). The PFP has also been used for receipt and large scale storage of plutonium scrap and product materials. The PFP Final Safety Analysis Report (FSAR) was prepared by WHC to document the hazards associated with the facility, present safety analyses of potential accident scenarios, and demonstrate the adequacy of safety class structures, systems, and components (SSCs) and operational safety requirements (OSRs) necessary to eliminate, control, or mitigate the identified hazards. Documented in this Safety Evaluation Report (SER) is DOE's independent review and evaluation of the PFP FSAR and the basis for approval of the PFP FSAR. The evaluation is presented in a format that parallels the format of the PFP FSAR. As an aid to the reactor, a list of acronyms has been included at the beginning of this report. The DOE review concluded that the risks associated with conducting plutonium handling, processing, and storage operations within PFP facilities, as described in the PFP FSAR, are acceptable, since the accident safety analyses associated with these activities meet the WHC risk acceptance guidelines and DOE safety goals in SEN-35-91

  2. 49 CFR 209.501 - Review of rail transportation safety and security route analysis.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of rail transportation safety and security....820 § 209.501 Review of rail transportation safety and security route analysis. (a) Review of route... establish that the route chosen by the carrier poses the least overall safety and security risk, the...

  3. School Survey on Crime and Safety (SSOCS) 2000 Public-Use Data Files, User's Manual, and Detailed Data Documentation. [CD-ROM].

    Science.gov (United States)

    National Center for Education Statistics (ED), Washington, DC.

    This CD-ROM contains the raw, public-use data from the 2000 School Survey on Crime and Safety (SSOCS) along with a User's Manual and Detailed Data Documentation. The data are provided in SAS, SPSS, STATA, and ASCII formats. The User's Manual and the Detailed Data Documentation are provided as .pdf files. (Author)

  4. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    at the end of 1999 when Posiva Ltd, the current implementer of the disposal programme, submitted the application for a decision-in-principle (DiP, 2000) for a spent fuel disposal facility in the Olkiluoto. The DiP was given by the government in late 2000, approved by the host municipality and ratified by the parliament in early 2001. It gave Posiva the authorisation to start to construct an underground rock characterisation facility, to the depth of the actual planned disposal, as required by regulation. The safety case to support the decision-in-principle application was compiled for 1999. The safety case included a concept description, proposed site characteristics, general facility layout and a safety assessment. The application was further supported by an environmental impact assessment report. Posiva has submitted a construction license application for a spent fuel encapsulation and disposal facility at the end of 2012. STUK is currently finalising the decisions related to the initial review phase and starting the detailed review. The preparatory phase has included among other things a systematic requirement and education programme, negotiation of framework agreements with external support experts and stepwise review of Posiva's developing safety case documents which included the draft construction license application documents. (authors)

  5. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    KRIPPS, L.J.

    2005-02-18

    This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  6. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  7. The Safety Case and Safety Assessment for the Disposal of Radioactive Waste

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-09-15

    This Safety Guide provides guidance and recommendations on meeting the safety requirements in respect of the safety case and supporting safety assessment for the disposal of radioactive waste. The safety case and supporting safety assessment provide the basis for demonstration of safety and for licensing of radioactive waste disposal facilities and assist and guide decisions on siting, design and operations. The safety case is also the main basis on which dialogue with interested parties is conducted and on which confidence in the safety of the disposal facility is developed. This Safety Guide is relevant for operating organizations preparing the safety case as well as for the regulatory body responsible for developing the regulations and regulatory guidance that determine the basis and scope of the safety case. Contents: 1. Introduction; 2. Demonstrating the safety of radioactive waste disposal; 3. Safety principles and safety requirements; 4. The safety case for disposal of radioactive waste; 5. Radiological impact assessment for the period after closure; 6. Specific issues; 7. Documentation and use of the safety case; 8. Regulatory review process.

  8. A document-driven method for certifying scientific computing software for use in nuclear safety analysis

    International Nuclear Information System (INIS)

    Smith, W. Spencer; Koothoor, Mimitha

    2016-01-01

    This paper presents a documentation and development method to facilitate the certification of scientific computing software used in the safety analysis of nuclear facilities. To study the problems faced during quality assurance and certification activities, a case study was performed on legacy software used for thermal analysis of a fuel pin in a nuclear reactor. Although no errors were uncovered in the code, 27 issues of incompleteness and inconsistency were found with the documentation. This work proposes that software documentation follow a rational process, which includes a software requirements specification following a template that is reusable, maintainable, and understandable. To develop the design and implementation, this paper suggests literate programming as an alternative to traditional structured programming. Literate programming allows for documenting of numerical algorithms and code together in what is termed the literate programmer's manual. This manual is developed with explicit traceability to the software requirements specification. The traceability between the theory, numerical algorithms, and implementation facilitates achieving completeness and consistency, as well as simplifies the process of verification and the associated certification

  9. A document-driven method for certifying scientific computing software for use in nuclear safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Smith, W. Spencer; Koothoor, Mimitha [Computing and Software Department, McMaster University, Hamilton (Canada)

    2016-04-15

    This paper presents a documentation and development method to facilitate the certification of scientific computing software used in the safety analysis of nuclear facilities. To study the problems faced during quality assurance and certification activities, a case study was performed on legacy software used for thermal analysis of a fuel pin in a nuclear reactor. Although no errors were uncovered in the code, 27 issues of incompleteness and inconsistency were found with the documentation. This work proposes that software documentation follow a rational process, which includes a software requirements specification following a template that is reusable, maintainable, and understandable. To develop the design and implementation, this paper suggests literate programming as an alternative to traditional structured programming. Literate programming allows for documenting of numerical algorithms and code together in what is termed the literate programmer's manual. This manual is developed with explicit traceability to the software requirements specification. The traceability between the theory, numerical algorithms, and implementation facilitates achieving completeness and consistency, as well as simplifies the process of verification and the associated certification.

  10. System Design and the Safety Basis

    International Nuclear Information System (INIS)

    Ellingson, Darrel

    2008-01-01

    The objective of this paper is to present the Bechtel Jacobs Company, LLC (BJC) Lessons Learned for system design as it relates to safety basis documentation. BJC has had to reconcile incomplete or outdated system description information with current facility safety basis for a number of situations in recent months. This paper has relevance in multiple topical areas including documented safety analysis, decontamination and decommissioning (D and D), safety basis (SB) implementation, safety and design integration, potential inadequacy of the safety analysis (PISA), technical safety requirements (TSR), and unreviewed safety questions. BJC learned that nuclear safety compliance relies on adequate and well documented system design information. A number of PIS As and TSR violations occurred due to inadequate or erroneous system design information. As a corrective action, BJC assessed the occurrences caused by systems design-safety basis interface problems. Safety systems reviewed included the Molten Salt Reactor Experiment (MSRE) Fluorination System, K-1065 fire alarm system, and the K-25 Radiation Criticality Accident Alarm System. The conclusion was that an inadequate knowledge of system design could result in continuous non-compliance issues relating to nuclear safety. This was especially true with older facilities that lacked current as-built drawings coupled with the loss of 'historical knowledge' as personnel retired or moved on in their careers. Walkdown of systems and the updating of drawings are imperative for nuclear safety compliance. System design integration with safety basis has relevance in the Department of Energy (DOE) complex. This paper presents the BJC Lessons Learned in this area. It will be of benefit to DOE contractors that manage and operate an aging population of nuclear facilities

  11. Preparation of NPP Dukovany periodic safety review

    International Nuclear Information System (INIS)

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  12. IAEA Concludes Safety Review at Chooz Nuclear Power Plant in France

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted good practices and made recommendations to reinforce safety measures during a review of operational safety at France's Chooz Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 17 June, focused on aspects essential to the safe operation of the NPP. The team comprised experts from Switzerland, Belgium, Germany, China, India, United Kingdom, Czech Republic, Canada, Hungary and the IAEA. The review covered the areas of management, organization and administration; training and qualification of personnel; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team identified good plant practices that will be shared with the rest of the nuclear industry for consideration. Examples include: The plant has a professional development programme as part of a joint employment effort shared by the plant and its contractors. This enables trainees to develop professional capability, understand practices and gain experience from other nuclear power plants in terms of work planning and coordination; The plant has built a strong relationship between the on-shift response team of the plant and the local fire brigade to improve firefighting and rescue operations; Self-assessment groups discuss and resolve specific issues within operations, empowering operations personnel to take ownership of improvement programmes; and The plant has improved warnings at entrances to all o range zones , areas of elevated dose rates to which only authorized staff have access. The team identified a number of improvements to operational safety at Chooz NPP. Examples include: The plant should review its process for the

  13. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  14. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  15. Safety assessment for the underground disposal of radioactive wastes

    International Nuclear Information System (INIS)

    1981-01-01

    This document is addressed to authorities and specialists responsible for or involved in planning, performing and reviewing safety assessments of underground radioactive waste repositories. It introduces and discusses in a general manner approaches and areas to be considered in making such safety assessments; its emphasis is on repositories for long-lived radioactive wastes in deep geological formations. It is hoped that this document will contribute to providing a base for a common understanding among the authorities and specialists concerned with the numerous studies involving a variety of scientific disciplines. While providing guidance, the document is also intended to stimulate further international discussion on this subject. It is the intention of the IAEA to develop more specific reports providing examples for the application of safety analyses for underground waste disposal

  16. Safety assessment for the underground disposal of radioactive wastes

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This document is addressed to authorities and specialists responsible for or involved in planning, performing and reviewing safety assessments of underground radioactive waste repositories. It introduces and discusses in a general manner approaches and areas to be considered in making such safety assessments; its emphasis is on repositories for long-lived radioactive wastes in deep geological formations. It is hoped that this document will contribute to providing a base for a common understanding among the authorities and specialists concerned with the numerous studies involving a variety of scientific disciplines. While providing guidance, the document is also intended to stimulate further international discussion on this subject. It is the intention of the IAEA to develop more specific reports providing examples for the application of safety analyses for underground waste disposal.

  17. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  18. Topics raised by the summary report of the first review meeting

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 7 of the document contains topics raised by the summary report of the first review meeting. The chapter covers status and position of the regulatory body, collective doses, effluents release trends, adoption of the ICRP 60 and basic safety standards, regulatory strategy, quality assurance, monitoring safety management, international cooperation, probabilistic safety assessment and safety improvement programmes

  19. Patient Safety and Workplace Bullying: An Integrative Review.

    Science.gov (United States)

    Houck, Noreen M; Colbert, Alison M

    Workplace bullying is strongly associated with negative nursing outcomes, such as work dissatisfaction, turnover, and intent to leave; however, results of studies examining associations with specific patient safety outcomes are limited or nonspecific. This integrative review explores and synthesizes the published articles that address the impact of workplace nurse bullying on patient safety.

  20. Regulatory regime and its influence in the nuclear safety

    International Nuclear Information System (INIS)

    Laaksonen, J.

    1999-01-01

    Main elements of nuclear regulatory regime in general is presented. These elements are: national rules and safety regulations, system of nuclear facility licensing, activities of regulatory body. Regulatory body is needed to specify the national safety regulations, review and assess the safety documentation presented to support license application, make inspections to verify fulfilment of safety regulations and license conditions, monitor the quality of work processes of user organization, and to assess whether these processes provide a high safety level, promote high safety culture, promote maintenance and development of national infrastructure relevant to nuclear safety, etc

  1. The transport safety programme

    International Nuclear Information System (INIS)

    Selling, H.A.

    1994-01-01

    The transport safety programme is one of the smaller technical sub-programmes in the Radiation Safety Section of the Division of Nuclear Safety, in terms of both regular budget and professional staff allocations. The overall aim of the programme is to promote the safe movement of radioactive material worldwide. The specific objectives are the development, review and maintenance of the Regulations for the Safe Transport of Radioactive Material, Safety Series No 6, and its supporting documents Safety Series Nos 7, 37 and 80 and the assistance to Member States and International Organizations in the proper implementation of the Regulations. One of the important issues that emerged during an ongoing Review/Revision process is the transport of Low-Specific Activity (LSA) material and Surface Contaminated Objects (SCO). Many of the radioactive waste materials fall in one of these categories. The subject has gained substance because it is expected that in the next decade radioactive waste could become available in so far unprecedented quantities and volumes due to decontamination and decommissioning of nuclear facilities. (author)

  2. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  3. Integrated plant safety assessment systematic evaluation program. R.E. Ginna Nuclear Power Plant, Rochester Gas and Electric Corporation, Docket No. 50-244

    International Nuclear Information System (INIS)

    1982-05-01

    The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the R.E. Ginna Nuclear Power Plant (located in Wayne County near Rochester, NY), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  4. Monitoring and reviewing research reactor safety in Australia

    International Nuclear Information System (INIS)

    Cairns, R.C.; Greenslade, G.K.

    1990-01-01

    Th research reactors operated by the Australian Nuclear Science and Technology Organization (ANSTO) comprise the 10 MW reactor HIFAR and the 100 kW reactor Moata. Although there are no power reactors in Australia the problems and issues of public concern which arise in the operation of research reactors are similar to those of power reactors although on a smaller scale. The need for independent safety surveillance has been recognized by the Australian Government and the ANSTO Act, 1987, required the Board of ANSTO to establish a Nuclear Safety Bureau (NSB) with responsibility to the Minister for monitoring and reviewing the safety of nuclear plant operated by ANSTO. The Executive Director of ANSTO operates HIFAR subject to compliance with requirements and arrangements contained in a formal Authorization from the Board of ANSTO. A Ministerial Direction to the Board of ANSTO requires the NSB to report to him, on a quarterly basis, matters relating to its functions of monitoring and reviewing the safety of ANSTO's nuclear plant. Experience has shown that the Authorization provides a suitable framework for the operational requirements and arrangements to be organised in a disciplined and effective manner, and also provides a basis for audits by the NSB by which compliance with the Board's safety requirements are monitored. Examples of the way in which the NSB undertakes its monitoring and reviewing role are given. Moata, which has a much lower operating power level and fission product inventory than HIFAR, has not been subject to a formal Authorization to date but one is under preparation

  5. RBMK safety issues

    International Nuclear Information System (INIS)

    Weber, J.P.; Reichenbach, D.; Tscherkashow, J.M.

    1995-01-01

    On the basis of information and documents from the RBMK operation countries, the Western consortium mainly examined the two most modern plants, Ignalin-2 and Smolensk-3. The identification of numerous shortcomings, some of which had already been recongized by the participating Eastern organizations, resulted in some 300 specific recommendations to reactor designers, operators and licensing authorities. These recommendations are to be acted upon at once; only a small number did not meet with the approval of the Eastern partners. The safety review provided the Western consotrium with a profound insight into the design and safety of third-generation RBMK reactors; the Eastern partners were able to accumulate experience in working with Western safety philosophy. (orig.) [de

  6. Improving the safety and reliability of Monju

    International Nuclear Information System (INIS)

    Itou, Kazumoto; Maeda, Hiroshi; Moriyama, Masatoshi

    1998-01-01

    Comprehensive safety review has been performed at Monju to determine why the Monju secondary sodium leakage accident occurred. We investigated how to improve the situation based on the results of the safety review. The safety review focused on five aspects of whether the facilities for dealing with the sodium leakage accident were adequate: the reliability of the detection method, the reliability of the method for preventing the spread of the sodium leakage accident, whether the documented operating procedures are adequate, whether the quality assurance system, program, and actions were properly performed and so on. As a result, we established for Monju a better method of dealing with sodium leakage accidents, rapid detection of sodium leakage, improvement of sodium drain facilities, and way to reduce damage to Monju systems after an accident. We also improve the operation procedures and quality assurance actions to increase the safety and reliability of Monju. (author)

  7. Integrated Plant Safety Assessment, Systematic Evaluation Program, Palisades Plant (Docket No. 50-255)

    International Nuclear Information System (INIS)

    1983-11-01

    This report documents the review completed under the SEP for those issues that required refined engineering evaluations or the continuation of ongoing evaluations after the Final IPSAR for the Palisades Plant was issued. The review has provided for (1) an assessment of the significance of differences between current technical positions on selected safety issues and those that existed when the Palisades Plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when the supplement to the Final IPSAR and the Safety Evaluation Report for converting the license from a provisional to a full-term license have been issued. The Final IPSAR and its supplement will form part of the bases for considering the conversion of the provisional operating license to a full-term operating license

  8. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review

    Science.gov (United States)

    Hall, Louise H.; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O’Connor, Daryl B.

    2016-01-01

    Objective To determine whether there is an association between healthcare professionals’ wellbeing and burnout, with patient safety. Design Systematic research review. Data Sources PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Eligibility Criteria for Selecting Studies Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Results Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Conclusions Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. Implications This review illustrates the need for healthcare organisations to consider improving employees’ mental health as well as creating safer work environments when planning interventions to improve patient safety. Systematic Review Registration PROSPERO registration number: CRD42015023340. PMID:27391946

  9. Development of human factors design review guidelines

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1997-10-01

    The Objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, Human factors engineering program review model' and '26, Review criteria for human actors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides be ing performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we well update the guidelines by reviewing the literature related to alarm design published after 1994

  10. Development of human factors design review guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea)

    1997-10-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: 25. Human Factors Engineering Program Review Model and 26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation, which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994. (author). 12 refs., 5 figs., 2 tabs.

  11. Best Estimate plus Uncertainty (BEPU) Analyses in the IAEA Safety Standards

    International Nuclear Information System (INIS)

    Dusic, Milorad; )

    2013-01-01

    The Safety Standards Series establishes an essential basis for safety and represents the broadest international consensus. Safety Standards Series publications are categorized into: Safety Fundamental (Present the overall objectives, concepts and principles of protection and safety, they are the policy documents of the safety standards), Safety Requirements (Establish requirements that must be met to ensure the protection and safety of people and the environment, both now and in the future), and Safety Guides (Provide guidance, in the form of more detailed actions, conditions or procedures that can be used to comply with the Requirements). The incorporation of more detailed requirements, in accordance with national practice, may still be necessary. There should be only one set of international safety standards. Each safety standard will be reviewed by the relevant committee or by the commission every five years. Best Estimate plus Uncertainty (BEPU) Analyses are approached in the following IAEA Safety Standards: - Safety Requirements SSR 2/1 - Safety of NPPs, Design (Revision of NS-R-1); - General Safety Requirement GSR Part 4: Safety Assessment for Facilities and Activities; - Safety Guide SSG-2 Deterministic Safety Analysis for Nuclear Power Plants. NUSSC suggested that new safety guides should be accompanied by documents like TECDOCs or Safety Reports describing in detail their recommendations where appropriate. Special review is currently underway to identify needs for revision in the light of the Fukushima accident. Revision will concern, first, the Safety Requirements, and then, the Selected Safety Guides

  12. The management of electronic documents generated from compilation and revision processes of nuclear and radiation safety regulations and standards

    International Nuclear Information System (INIS)

    Wang Wenhai; Fan Yun; Shang Zhaorong

    2010-01-01

    As the Secretary Group of Regulations and Standards Review Committee on nuclear and radiation safe needs to deal with a large number of electronic documents in course of the regulation and standard review meetings, the article gives a systematical method including electronic document file naming and management as well as procedures of file transfer, storage and usage. (authors)

  13. Nuclear Safety: Technical progress review, January--March 1989

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E. G. [ed.

    1989-01-01

    This review journal covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  14. Integrated-plant-safety assessment Systematic Evaluation Program. Dresden Nuclear Power Station, Unit 2, Commonwealth Edison Company, Docket No. 50-237

    International Nuclear Information System (INIS)

    1982-10-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of Dresden Nuclear Generating Station, Unit 2 owned and operated by the Commonwealth Edison Company and located in Grundy County, Illinois. Dresden Unit 2 is one of ten plants reviewed under Phase II of this program, which indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  15. Applications for electronic documents

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1995-01-01

    This paper discusses the application of electronic media to documents, specifically Safety Analysis Reports (SARs), prepared for Environmental Restoration and Waste Management (ER ampersand WM) programs being conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). Efforts are underway to upgrade our document system using electronic format. To satisfy external requirements (DOE, State, and Federal), ER ampersand WM programs generate a complement of internal requirements documents including a SAR and Technical Safety Requirements along with procedures and training materials. Of interest, is the volume of information and the difficulty in handling it. A recently prepared ER ampersand WM SAR consists of 1,000 pages of text and graphics; supporting references add 10,000 pages. Other programmatic requirements documents consist of an estimated 5,000 pages plus references

  16. The role of international atomic energy agency in maintaining nuclear safety competence

    International Nuclear Information System (INIS)

    Aro, I.; Mazour, T.

    2000-01-01

    This paper provides information how International Atomic Energy Agency can assist Member States in maintaining and developing nuclear safety competence. The topics covered include the development of safety standards, organisation of nuclear safety related conferences, provision of safety reviews, organisation of training courses and topical workshops and publication of training related documents. Usefulness of these activities for competence development is discussed. (author)

  17. Use of FPGA and CPLD in nuclear reactor safety systems and its regulatory review requirements for reactor safety

    International Nuclear Information System (INIS)

    Roy, Suvadip; Biswas, Animesh; Pradhan, S.K.

    2015-01-01

    Field Programmable Gate Arrays (FPGA) and Complex Programmable Logic Devices (CPLD) is being used widely in safety critical and safety related systems in nuclear power plans like in trip logic units, Engineered Safety Feature (ESF) actuation decision logic and neutronic signal processing for their reprogrammability feature and compact design. These HDL Programmable devices (HPD) are complex devices consisting of both hardware and software which is used to implement the logic on the FPGA. It is observed that these Programmable devices suffer from various modes of failure and the major failures in these devices are due to Single Event Upset (SEU), where a highly energetic ionizing radiation may lead to device failure which can even occur in radiologically benign environment. Other failures can occur during steps of developing the hardware using software tools like during Synthesis and placement and routing of the desired hardware. Here a study on use of such devices in Nuclear Reactors, study on mode of failures of these devices, way to tackle such failure and development of review guidelines for review of such devices used in safety critical and safety related systems with special emphasis on choice of software tools, way to mitigate effects of SEU and simulation and hardware testing results to be reviewed by regulatory body during design safety review is done. (author)

  18. Fuel safety criteria and review by OECD / CSNI task force

    International Nuclear Information System (INIS)

    Van Doesburg, W.

    1999-01-01

    Full text of publication follows: with the advent of advanced fuel and core designs, and the implementation of more accurate (best estimate or statistical) design and analysis methods, there is a general feeling that safety margins have been or are being reduced. Historically, fuel safety margins were defined by adding conservatism to the safety limits, which in turn were also fixed in a conservative manner, here, the expression 'conservatism' expresses the fact that bounding or limiting numbers were chosen for model parameters, plant and fuel design data, and fuel operating history values. Unfortunately, as these conservatisms were not quantified (or quantifiable), the amount of safety available or the reduction thereof is difficult to substantiate. For the regulator, it is important to know the margin available with the utilities' request for approval of new fuel or methods; likewise, for the utility and vendor it is important to know what margins exist and what they are based on, to identify in which direction they can make further progress and optimize fuel and fuel cycle cost. Naturally, each party involved will have to decide on how much margin should be in place, to establish operational criteria and ensure that these can actually be met during operation. To assess the margins issue, safety criteria themselves need to be reviewed first. Most - if not all - of the currently existing safety criteria were established during the 60's and early 70's, and verified against experiments with fuel available at that time - mostly at zero exposure. Of course, verification was performed as designs progressed in later years, primarily with the aim to be able to prove that safety criteria were adequate as long as the said conservatisms would be retained, and not with the aim to reestablish limits. The mandate to the OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria (TFFSC) is to assess the adequacy of existing fuel safety criteria, in view of the 'new design' elements (new

  19. Implementation in Russia and the European Union of International Safety Standards of Identity Documents with Biometric Data: Legal Regulation and Perspectives

    Directory of Open Access Journals (Sweden)

    Alexander Grigoryevich Volevodz

    2015-01-01

    Full Text Available The article contains the findings of a research into particular aspects of use of identity documents with personal biometric data. It considers the international safety standards of documents with biometric data worked out by the International Civil Aviation Organization (ICAO, pursuant to which those data should be included into machine-readable documents used by their holders for travel to various states. It contains the information on the implementation of these international standards in Russian and European Union law. The author has substantiated a conclusion to the effect that the procedure established in Russia for production and issuance, as well as for use of international, diplomatic and service passports identifying the Russian Federation citizen outside the Russian Federation territory, containing electronic information carriers with personal and biometric personal data, currently conforms to the international safety standards of documents with biometric data. The article surveys the experience of introducing domestic biometric identity documents - electronic passports in various countries of the world, and the problems arising therefrom. It substantiates the advantages and disadvantages of determining a passport of the Russian Federation citizen issued in the form of an identity card with an electronic information carrier, as the main document of the Russian Federation citizen identifying him domestically within the country's territory.

  20. Economic evaluation in patient safety: a literature review of methods.

    Science.gov (United States)

    de Rezende, Bruna Alves; Or, Zeynep; Com-Ruelle, Laure; Michel, Philippe

    2012-06-01

    Patient safety practices, targeting organisational changes for improving patient safety, are implemented worldwide but their costs are rarely evaluated. This paper provides a review of the methods used in economic evaluation of such practices. International medical and economics databases were searched for peer-reviewed publications on economic evaluations of patient safety between 2000 and 2010 in English and French. This was complemented by a manual search of the reference lists of relevant papers. Grey literature was excluded. Studies were described using a standardised template and assessed independently by two researchers according to six quality criteria. 33 articles were reviewed that were representative of different patient safety domains, data types and evaluation methods. 18 estimated the economic burden of adverse events, 3 measured the costs of patient safety practices and 12 provided complete economic evaluations. Healthcare-associated infections were the most common subject of evaluation, followed by medication-related errors and all types of adverse events. Of these, 10 were selected that had adequately fulfilled one or several key quality criteria for illustration. This review shows that full cost-benefit/utility evaluations are rarely completed as they are resource intensive and often require unavailable data; some overcome these difficulties by performing stochastic modelling and by using secondary sources. Low methodological transparency can be a problem for building evidence from available economic evaluations. Investing in the economic design and reporting of studies with more emphasis on defining study perspectives, data collection and methodological choices could be helpful for strengthening our knowledge base on practices for improving patient safety.

  1. Harnessing implementation science to improve care quality and patient safety: a systematic review of targeted literature.

    Science.gov (United States)

    Braithwaite, Jeffrey; Marks, Danielle; Taylor, Natalie

    2014-06-01

    Getting greater levels of evidence into practice is a key problem for health systems, compounded by the volume of research produced. Implementation science aims to improve the adoption and spread of research evidence. A linked problem is how to enhance quality of care and patient safety based on evidence when care settings are complex adaptive systems. Our research question was: according to the implementation science literature, which common implementation factors are associated with improving the quality and safety of care for patients? We conducted a targeted search of key journals to examine implementation science in the quality and safety domain applying PRISMA procedures. Fifty-seven out of 466 references retrieved were considered relevant following the application of exclusion criteria. Included articles were subjected to content analysis. Three reviewers extracted and documented key characteristics of the papers. Grounded theory was used to distil key features of the literature to derive emergent success factors. Eight success factors of implementation emerged: preparing for change, capacity for implementation-people, capacity for implementation-setting, types of implementation, resources, leverage, desirable implementation enabling features, and sustainability. Obstacles in implementation are the mirror image of these: for example, when people fail to prepare, have insufficient capacity for implementation or when the setting is resistant to change, then care quality is at risk, and patient safety can be compromised. This review of key studies in the quality and safety literature discusses the current state-of-play of implementation science applied to these domains. © The Author 2014. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.

  2. Radioactive Waste Isolation in Salt: Peer review of documents dealing with geophysical investigations

    International Nuclear Information System (INIS)

    McGinnis, L.D.; Bowen, R.H.

    1987-03-01

    The Salt Repository Project, a US Department of Energy program to develop a mined repository in salt for high-level radioactive waste, is governed by a complex and sometimes inconsistent array of laws, administrative regulations, guidelines, and position papers. In conducting multidisciplinary peer reviews of contractor documents in support of this project, Argonne National Laboratory has needed to inform its expert reviewers of these governmental mandates, with particular emphasis on the relationship between issues and the technical work undertaken. This report acquaints peer review panelists with the regulatory framework as it affects their reviews of site characterization plans and related documents, including surface-based and underground test plans. Panelists will be asked to consider repository performance objectives and issues as they judge the adequacy of proposed geophysical testing. All site-specific discussions relate to the Deaf Smith County site in Texas, which was approved for site characterization by the President in May 1986. Natural processes active at the Deaf Smith County site and the status of geophysical testing near the site are reviewed briefly. 25 refs., 4 figs., 5 tabs

  3. 78 FR 25476 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2013-05-01

    ... Safety Officer Medal of Valor Review Board AGENCY: Bureau of Justice Assistance (BJA), Department of...) of the Public Safety Officer Medal of Valor Review Board to consider a range of issues of [email protected] . SUPPLEMENTARY INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out...

  4. 77 FR 26790 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2012-05-07

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Bureau of Justice... meeting (via conference call-in) of the Public Safety Officer Medal of Valor Review Board (``Board'') to... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions...

  5. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    International Nuclear Information System (INIS)

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs

  6. Nuclear Fuel Safety Criteria Technical Review - Second edition

    International Nuclear Information System (INIS)

    Beck, Winfried; Blanpain, Patrick; Fuketa, Toyoshi; Gorzel, Andreas; Hozer, Zoltan; Kamimura, Katsuichiro; Koo, Yang-Hyun; Maertens, Dietmar; Nechaeva, Olga; Petit, Marc; Rehacek, Radomir; Rey-Gayo, Jose Maria; Sairanen, Risto; Sonnenburg, Heinz-Guenther; Valach, Mojmir; Waeckel, Nicolas; Yueh, Ken; Zhang, Jinzhao; Voglewede, John

    2012-01-01

    Most of the current nuclear fuel safety criteria were established during the 1960's and early 1970's. Although these criteria were validated against experiments with fuel designs available at that time, a number of tests were based on unirradiated fuels. Additional verification was performed as these designs evolved, but mostly with the aim of showing that the new designs adequately complied with existing criteria, and not to establish new limits. In 1996, the OECD Nuclear Energy Agency (NEA) reviewed existing fuel safety criteria, focusing on new fuel and core designs, new cladding materials and industry manufacturing processes. The results were published in the Nuclear Fuel Safety Criteria Technical Review of 2001. The NEA has since re-examined the criteria. A brief description of each criterion and its rationale are presented in this second edition, which will be of interest to both regulators and industry (fuel vendors, utilities)

  7. Environmental qualification - walkdowns: The documentation of configuration information for safety related components, equipment and systems

    International Nuclear Information System (INIS)

    Melmer, J.; Waters, M.

    1995-01-01

    Environmental Qualification walkdowns are conducted to collect field data to verify/validate/document configurations of safety related equipment and systems. This paper describes the process for conducting walkdowns and the justification for using an electronic format. The following are described: a) Background; b) Preparing, executing and processing walkdowns; c) Hardware/software; d) Impact of a paperless system on walkdown execution, maintenance and work planning; e) Other applications for the technology

  8. The periodic safety review of nuclear power plants. Practices in OECD countries

    International Nuclear Information System (INIS)

    1992-01-01

    This report gives an overview of the regulatory concepts and practices for the periodic safety review of nuclear power plants in OECD countries with nuclear power programmes. The statutory bases for such reviews, their objectives and the processes adopted are summarised against the background of each country's regulatory practices. Although periodic safety reviews are now, or will soon be, part of the regulatory process in the majority of countries, the national approaches to these reviews still differ considerably. This report includes numerous examples of the different concepts and practices in OECD countries, thereby illustrating the variety of ways adopted to reach the common goal of maintaining and improving nuclear safety

  9. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  10. Integrated-plant-safety assessment Systematic Evaluation program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245

    International Nuclear Information System (INIS)

    1982-11-01

    The Systematic Evaluation Program was initiated in February 1977 to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  11. 29 CFR 2200.108 - Official Seal of the Occupational Safety and Health Review Commission.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Official Seal of the Occupational Safety and Health Review... Occupational Safety and Health Review Commission. The seal of the Commission shall consist of: A gold eagle... background, encircled by a white band edged in black and inscribed “Occupational Safety and Health Review...

  12. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  13. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  14. Development of regulatory guidance on safety reviews of nuclear power plants in Germany. A survey on accomplished and current PSA activities

    International Nuclear Information System (INIS)

    Berg, H.-P.; Froehmel, T.; Goertz, R.; Rehs, B.

    2005-01-01

    The paper describes the key points of the accomplished and current regulatory activities in order to revise PSA guide and the corresponding technical documents in Germany. The regulatory German PSA guide covers the fundamental requirements concerning the performance of PSAs in the frame of comprehensive safety reviews. The technical details regarding the performance of PSA are set out in two technical documents (PSA Methods and PSA Data) that have been developed by a working group of PSA experts (FAK PSA). Based on the experiences from the first series of PSRs, international experiences and the fact that PSR is mandatory since April 2002 revisions of all guides are underway. The first guide to be updated is the PSA guide together with the corresponding technical documents. The working programme and the revision process of FAK PSA was finished at the end of 2004 and the technical documents have recently been republished. (author)

  15. Technical basis document for natural event hazards

    International Nuclear Information System (INIS)

    CARSON, D.M.

    2003-01-01

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for natural event hazards (NEH)-initiated representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report

  16. Digital Documentation of Ships in Cultural Heritage: a European Review

    Science.gov (United States)

    Colson, A.

    2017-08-01

    Ships of different shapes and times are lying in harbours, on land or in museums, all over the world. Our aim with this paper was to review work done on digital documentation of ships in Cultural Heritage based on different initiatives in Europe using Coordinate Measuring Machine (Newport Ship and Doel 1); Total Station Theodolite (Vasa and Mary-Rose) and Laser scanning (LaScanMar and Traditional boats of Ireland). Our results showed that some discrepancy exist between the projects, in terms of techniques and expertise at hand. Furthermore, few guidelines have been in practice but only for Archaeology and Ethnology. However, no standards are existing. Three focuses have emerged: documentation of single ship elements, monitoring of the long-term deformation processes and the documentation of collections of ships. We discussed the diversity of expert's background and the complexity of comparability between projects. In conclusion, guidelines are necessary to enable a common ground for all professions to work together, e.g. in Architecture. This path must be taken now for digital documentation of ships, if not information and knowledge will be lost on the way.

  17. Development of human factors design review guidelines(II)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-06-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: 25. Human Factors Engineering Program Review Model and 26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation, which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994. (author). 11 refs., 2 figs., 2 tabs.

  18. Effect of electronic device use on pedestrian safety : a literature review.

    Science.gov (United States)

    2016-04-01

    This literature review on the effect of electronic device use on pedestrian safety is part of a research project sponsored by the Office of Behavioral Safety Research in the National Highway Traffic Safety Administration (NHTSA). An extensive literat...

  19. Integrated plant safety assessment: Systematic Evaluation Program, San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206): Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of San Onofre Nuclear Generating Station, Unit 1, operated by Southern California Edison Company. The San Onofre plant is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. This report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the draft report issued in April 1985

  20. Nuclear Safety: Volume 29, No. 3: Technical progress review

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1988-07-01

    Nuclear Safety is a review journal that covers significant development in the field of nuclear safety. Its scope included the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Individual papers have been cataloged separately.

  1. SCART guidelines. Reference report for IAEA Safety Culture Assessment Review Team (SCART)

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA Director General stressed the role of safety culture in his concluding remarks at the Meeting of the Contracting Parties to the Convention on Nuclear Safety in 2002: 'As we have learned in other areas, it is not enough simply to have a structure; it is not enough to say that we have the necessary laws and the appropriate regulatory bodies. All these are important, but equally important is that we have in place a safety culture that gives effect to the structure that we have developed. To me, effectiveness and transparency are keys. So, it is an issue which I am pleased to see, you are giving the attention it deserves and we will continue to work with you in clarifying, developing and applying safety culture through our programmes and through our technical cooperation activities.' The concept of safety culture was initially developed by the International Nuclear Safety Advisory Group (INSAG) after the Chernobyl accident in 1986. Since then the IAEA's perspective of safety culture has expanded with time as its recognition of the complexities of the concept developed. Safety culture is considered to be specific organizational culture in all types of organizations with activities that give rise to radiation risks. The aim is to make safety culture strong and sustainable, so that safety becomes a primary focus for all activities in such organizations, even for those, which might not look safety-related at first. SCART (Safety Culture Assessment Review Team) is a safety review service, which reflects the expressed interest of Members States for methods and tools for safety culture assessment. It is a replacement for the earlier service ASCOT (Assessment of Safety Culture in Organizations Team). The IAEA Safety Fundamentals, Requirements and Guides (Safety Standards) are the basis for the SCART Safety Review Service. The reports of INSAG, identifying important current nuclear safety issues, serve also as references during a SCART mission. SCART missions are based

  2. Safety evaluation for packaging CPC metal boxes

    International Nuclear Information System (INIS)

    Romano, T.

    1995-01-01

    This Safety Evaluation for Packaging (SEP) provides authorization for the use of Container Products Corporation (CPC) metal boxes, as described in this document, for the interarea shipment of radioactive contaminated equipment and debris for storage in the Central Waste Complex (CWC) or T Plant located in the 200 West Area. Authorization is granted until November 30, 1995. The CPC boxes included in this SEP were originally procured as US Department of Transportation (DOT) Specification 7A Type A boxes. A review of the documentation provided by the manufacturer revealed the documentation did not adequately demonstrate compliance to the 4 ft drop test requirement of 49 CFR 173.465(c). Preparation of a SEP is necessary to document the equivalent safety of the onsite shipment in lieu of meeting DOT packaging requirements until adequate documentation is received. The equivalent safety of the shipment is based on the fact that the radioactive contents consist of contaminated equipment and debris which are not dispersible. Each piece is wrapped in two layers of no less than 4 mil plastic prior to being placed in the box which has an additional 10 mil liner. Pointed objects and sharp edges are padded to prevent puncture of the plastic liner and wrapping

  3. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  4. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  5. Hanford surplus facilities hazards identification document

    International Nuclear Information System (INIS)

    Egge, R.G.

    1997-01-01

    This document provides general safety information needed by personnel who enter and work in surplus facilities managed by Bechtel Hanford, Inc. The purpose of the document is to enhance access control of surplus facilities, educate personnel on the potential hazards associated with these facilities prior to entry, and ensure that safety precautions are taken while in the facility

  6. The international standard for protection from ionizing radiation and safety of radiation sources

    Energy Technology Data Exchange (ETDEWEB)

    Schlesinger, T [Israel Atomic Energy Commission, Yavne (Israel). Soreq Nuclear Research Center

    1995-06-01

    This document is a review in hebrew of the new 1994 international standard of the IAEA. The new standard title is `Basic safety standards for radiation protection and for the safety of radiation sources`, which were published in the ICRP Pub. 9.

  7. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Science.gov (United States)

    Hall, Louise H; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O'Connor, Daryl B

    2016-01-01

    To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety. Systematic research review. PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety. PROSPERO registration number: CRD42015023340.

  8. Safety and efficacy of fenproporex for obesity treatment: a systematic review

    OpenAIRE

    Paumgartten,Francisco José Roma; Pereira,Sabrina Schaaf Teixeira Costa; Oliveira,Ana Cecilia Amado Xavier de

    2016-01-01

    ABSTRACT OBJECTIVE To evaluate clinical evidence on the safety and efficacy of fenproporex for treating obesity. METHODS MEDLINE, LILACS and Cochrane Controlled Trials Register were searched as well as references cited by articles and relevant documents. Two authors independently assessed the studies for inclusion and regarding risk of bias, collected data, and accuracy. Eligible studies were all those placebo-controlled that provided data on the efficacy and safety of Fenproporex to trea...

  9. Patient participation in patient safety and nursing input - a systematic review.

    Science.gov (United States)

    Vaismoradi, Mojtaba; Jordan, Sue; Kangasniemi, Mari

    2015-03-01

    This systematic review aims to synthesise the existing research on how patients participate in patient safety initiatives. Ambiguities remain about how patients participate in routine measures designed to promote patient safety. Systematic review using integrative methods. Electronic databases were searched using keywords describing patient involvement, nursing input and patient safety initiatives to retrieve empirical research published between 2007 and 2013. Findings were synthesized using the theoretical domains of Vincent's framework for analysing risk and safety in clinical practice: "patient", "healthcare provider", "task", "work environment", "organisation & management". We identified 17 empirical research papers: four qualitative, one mixed-method and 12 quantitative designs. All 17 papers indicated that patients can participate in safety initiatives. Improving patient participation in patient safety necessitates considering the patient as a person, the nurse as healthcare provider, the task of participation and the clinical environment. Patients' knowledge, health conditions, beliefs and experiences influence their decisions to engage in patient safety initiatives. An important component of the management of long-term conditions is to ensure that patients have sufficient knowledge to participate. Healthcare providers may need further professional development in patient education and patient care management to promote patient involvement in patient safety, and ensure that patients understand that they are 'allowed' to inform nurses of adverse events or errors. A healthcare system characterised by patient-centredness and mutual acknowledgement will support patient participation in safety practices. Further research is required to improve international knowledge of patient participation in patient safety in different disciplines, contexts and cultures. Patients have a significant role to play in enhancing their own safety while receiving hospital care. This

  10. A LITERATURE REVIEW ON GLOBAL OCCUPATIONAL SAFETY AND HEALTH PRACTICE & ACCIDENTS SEVERITY

    Directory of Open Access Journals (Sweden)

    Kassu Jilcha

    2016-06-01

    Full Text Available This literature review focuses on researches undertaken since 1980s onwards. The purpose of the study is to identify existing gaps on workplace safety and health management and propose future research areas. The review adds value to existing electronic database through integration of researches' results. To identify existing gaps, a systematic literature review approach has been used. The reviews were undertaken through keywords and safety related topics. In the literature, various characteristics of workplace safety and health problems were found emanating from the lack of operational activities of the employees, internal working environment and external environment those impose hazards on employee temporarily, permanently and on working environments. The integration of multidisciplinary approaches and collaborative model of hub and peripheral industries to protect workplace safety hazards to develop multilevel model has been undermined in many researches. The other face of finding is that knowledge transfer mechanism and industrial topology factors are left. Some researches finding showed that they have focused on single problems related to health and health factors leaving universal improving workplace safety. In general, this literature reviews compare various studies output based on their research method and findings to fills gap and add value to a body of knowledge.

  11. Concepts and examples of safety analyses for radioactive waste repositories in continental geological formations

    International Nuclear Information System (INIS)

    1983-01-01

    This document is addressed to authorities and specialists responsible for or involved in planning, performing and/or reviewing safety assessments of underground radioactive waste repositories. It is a companion to a general introductory document on the subject ''Safety Assessment for the Underground Disposal of Radioactive Wastes'', IAEA Safety Series No. 56, 1981, and reference to this earlier document will facilitate the reader's understanding of the present report. Since examples of safety analyses are summarized here, it is hoped that this document will contribute to providing a basis for a common understanding among authorities and specialists concerned with the numerous studies involving a variety of scientific disciplines. While providing technical information, this document is also intended to stimulate further international discussion. The purposes of this report are: a) to identify the factors to be taken into account in radiological safety analyses of deep geological repositories, indicating as far as possible their relative importance during the various phases of system development; b) to show how these factors have been analysed in various safety assessment studies; and c) to comment on the merits of the selected and alternative approaches

  12. Concepts and examples of safety analyses for radioactive waste repositories in continental geological formations

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    This document is addressed to authorities and specialists responsible for or involved in planning, performing and/or reviewing safety assessments of underground radioactive waste repositories. It is a companion to a general introductory document on the subject ''Safety Assessment for the Underground Disposal of Radioactive Wastes'', IAEA Safety Series No. 56, 1981, and reference to this earlier document will facilitate the reader's understanding of the present report. Since examples of safety analyses are summarized here, it is hoped that this document will contribute to providing a basis for a common understanding among authorities and specialists concerned with the numerous studies involving a variety of scientific disciplines. While providing technical information, this document is also intended to stimulate further international discussion. The purposes of this report are: a) to identify the factors to be taken into account in radiological safety analyses of deep geological repositories, indicating as far as possible their relative importance during the various phases of system development; b) to show how these factors have been analysed in various safety assessment studies; and c) to comment on the merits of the selected and alternative approaches.

  13. Second review meeting of the Contracting Parties to the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Rafferty, Barbara

    2002-01-01

    The Second Review Meeting of the Contracting Parties to the Convention on Nuclear Safety was held in the Headquarters of the International Atomic Energy Agency in Vienna from 15-26 April 2002, under the chairmanship of the President, Mr Miroslav Gregoric, Director of the Slovenian Nuclear Safety Authority. The Convention on Nuclear Safety entered into force in October 1996, has been signed by sixty-five States and ratified by fifty-four, bringing within its scope 428 of the 448 nuclear reactors worldwide. The Convention aims to achieve and maintain a high level of nuclear safety worldwide, through inter alia enhancement of national measures and international co-operation. Obligations on Contracting Parties in accordance with the Convention include: the establishment and maintenance of a legislative and regulatory framework to govern the safety of land-based civil nuclear installations; the allocation of adequate financial and human resources to support the safety objectives; ensuring that all reasonably practicable improvements to safety are made as a matter of urgency. Adherence to this Convention entails two basic commitments by each Contracting Party: to prepare and make available a national report for review; and to subject its national report to a peer review by the other Contracting Parties. Thus, being a Contracting Party to this Convention involves: including in the national report a self-assessment of steps and measures already taken and in progress to implement the Convention obligations; taking an active part in an open and transparent review of its national report and the Reports of other Contracting Parties; and a commitment to a continuous learning and improving process, something which is a key element of a strong safety culture. The peer review of national reports takes place every three years, the first having been held in 1999. The Second Review Meeting was attended by delegates from 46 contracting parties. During the review certain issues were

  14. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  15. Integrated plant safety assessment: systematic evaluation program. Oyster Creek nuclear generating station. GPU Nuclear Corporation and Jersey Central Power and Light Company. Docket No. 50-219

    International Nuclear Information System (INIS)

    1982-09-01

    The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Oyster Creek Nuclear Generating Station (located in Ocean County, New Jersey), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  16. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  17. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  18. A review of the nuclear safety activities in Italy

    International Nuclear Information System (INIS)

    Merelli, A.

    1989-01-01

    A review of research programs carried out in Italy in the field of nuclear reactor safety was done in 1986, in the frame of the activities of the Commission of the European Communities, the International Energy Agency and the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The report contains information on these programs, as well as information on the organization of safety research in Italy and the evolution of safety research programs

  19. Bases of updating of nuclear safety regulations for NPP in Romania

    International Nuclear Information System (INIS)

    Biro, Lucian; Serbanescu, Dan

    1999-01-01

    The paper presents the basic principles of reviewing and updating process of the regulatory environment pyramid. The main part of this review process refers to Cernavoda NPP Unit 2. However, there is an important impact on Cernavoda NPP Unit 1. The basic principles were defined in 1993/1994 when the licensing process for Unit 1 was resumed in order to be in accordance with the latest developments of Candu 600 worldwide and with the IAEA and NEA latest recommended documents and practices. After the licensing process for the Unit 1 was completed up to operation stage, CNCAN developed new updated regulations on nuclear safety and the regulatory pyramid in the framework of the RAMG PHARE project. CNCAN issued in 1996 the regulatory Policy for Unit 2, self-sustained and independent of future possible revisions of the regulations. The use of the concept of hierarchical systems, systematic review of safety criteria and objectives and margins along with the feedback from international and national experience on this topic ensured issuance of a reference document for future approach of nuclear safety in Romania. (authors)

  20. Packaging Review Guide for Reviewing Safety Analysis Reports for Packagings

    Energy Technology Data Exchange (ETDEWEB)

    DiSabatino, A; Biswas, D; DeMicco, M; Fisher, L E; Hafner, R; Haslam, J; Mok, G; Patel, C; Russell, E

    2007-04-12

    This Packaging Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his or her review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. This PRG is generally organized at the section level in a format similar to that recommended in Regulatory Guide 7.9 (RG 7.9). One notable exception is the addition of Section 9 (Quality Assurance), which is not included as a separate chapter in RG 7.9. Within each section, this PRG addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards. This Packaging Review Guide (PRG) provides guidance for DOE review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE O 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. The primary objectives of this PRG are to: (1) Summarize the regulatory requirements for package approval; (2) Describe the technical review procedures by which DOE determines that these requirements have been satisfied; (3) Establish and maintain the quality and uniformity of reviews; (4) Define the base from which to evaluate proposed changes in scope

  1. Canister storage building design basis accident analysis documentation

    International Nuclear Information System (INIS)

    KOPELIC, S.D.

    1999-01-01

    This document provides the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  2. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  3. Safety Committees for Argentinean Research Reactor - Regulatory Issues

    International Nuclear Information System (INIS)

    Perrin, Carlos D.

    2009-01-01

    In the field of radiological and nuclear safety, the Nuclear Regulatory Authority (ARN) of Argentina controls three research reactors and three critical assemblies, by means of evaluations, audits and inspections, in order to ensure the fulfillment of the requirements established in the Licenses, in the Regulatory Standards and in the Mandatory Documentation in general. From the Nuclear Regulatory Authority's point of view, within the general process of research reactors safety management, the Operational Organization self verification of radiological and nuclear safety plays an outstanding role. In this aspect the ARN has established specific requirements in the Regulatory Standards, in the Operation Licenses and in the Operational Limits and Conditions. These requirements include the figure of different safety committees, which act as reviewers or advisers in diverse situations. This paper describes the main characteristics of the committees, their function, scope and the regulatory documents where the requirements are included. (author)

  4. K Basins Spent Nuclear Fuel (SNF) Project Safety Analysis Report for Packaging (SARP) approval plan

    International Nuclear Information System (INIS)

    1995-01-01

    This document delineates the plan for preparation, review, and approval of the K Basins Spent Nuclear Fuel (SNF) Packaging Design Criteria (PDC) document and the on-site Safety Analysis Report for Packaging (SARP). The packaging addressed in these documents is used to transport SNF in a Multi- canister Overpack (MCO) configuration

  5. Basins 4.0 Climate Assessment Tool (Cat): Supporting Documentation and User Manual (External Review Draft)

    Science.gov (United States)

    EPA has released of the draft document solely for the purpose of pre-dissemination peer review under applicable Information Quality Guidelines (IQGs). This document has not been formally disseminated by EPA. It does not represent and should not be construed to represent any Agenc...

  6. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Directory of Open Access Journals (Sweden)

    Louise H Hall

    Full Text Available To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety.Systematic research review.PsychInfo (1806 to July 2015, Medline (1946 to July 2015, Embase (1947 to July 2015 and Scopus (1823 to July 2015 were searched, along with reference lists of eligible articles.Quantitative, empirical studies that included i either a measure of wellbeing or burnout, and ii patient safety, in healthcare staff populations.Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all subscales of the burnout measures employed, and patient safety.Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed.This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety.PROSPERO registration number: CRD42015023340.

  7. Systematic evaluation program review of NRC Safety Topic VI-7.3 associated with the electrical, instrumentation and control portions of the ECCS actuation system for the Dresden II Nuclear Power Plant

    International Nuclear Information System (INIS)

    St Leger-Barter, G.

    1980-11-01

    This report documents the technical evaluation and review of NRC Safety Topic VI-7.A.3, associated with the electrical, instrumentation, and control portions of the classification of the ECCS actuation system for the Dresden II nuclear power plant, using current licensing criteria

  8. Defining initiating events for purposes of probabilistic safety assessment

    International Nuclear Information System (INIS)

    1993-09-01

    This document is primarily directed towards technical staff involved in the performance or review of plant specific Probabilistic Safety Assessment (PSA). It highlights different approaches and provides typical examples useful for defining the Initiating Events (IE). The document also includes the generic initiating event database, containing about 300 records taken from about 30 plant specific PSAs. In addition to its usefulness during the actual performance of a PSA, the generic IE database is of the utmost importance for peer reviews of PSAs, such as the IAEA's International Peer Review Service (IPERS) where reference to studies on similar NPPs is needed. 60 refs, figs and tabs

  9. Development of human factors design review guidelines(III)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-02-15

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994.

  10. Development of human factors design review guidelines(III)

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1999-02-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994

  11. Development of human factors design review guidelines(II)

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1998-06-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994

  12. Development of human factors design review guidelines(III)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-02-15

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994.

  13. Comprehensive review of the maritime safety regimes.

    NARCIS (Netherlands)

    S. Knapp (Sabine); Ph.H.B.F. Franses (Philip Hans)

    2007-01-01

    textabstractThis report presents a comprehensive review of the maritime safety regimes and provides recommendations on how to improve the system. The results show a complex legal framework which generates a high amount of inspections and overlapping of inspection areas where no cross-recognition is

  14. SRTC criticality safety technical review of SRT-CMA-930039

    International Nuclear Information System (INIS)

    Rathbun, R.

    1993-01-01

    Review of SRT-CMA-930039, ''Nuclear Criticality Safety Evaluation (NCSE): DWPF Melter-Batch 1,'' December 1, 1993, has been performed by the Savannah River Technical Center (SRTC) Applied Physics Group. The NCSE is a criticality assessment of the Melt Cell in the DWPF. Additionally, this pertains only to Batch 1 operation, which differs from batches to follow. Plans for subsequent batch operations call for fissile material in the Salt Cell feed-stream, which necessitates a separate criticality evaluation in the future. The NCSE under review concludes that the process is safe from criticality events, even in the event that all lithium and boron neutron poisons are lost, provided uranium enrichments are less than 40%. Furthermore, if all the lithium and as much as 98% of the boron would be lost, uranium enrichments of 100% would be allowable. After a thorough review of the NCSE, this reviewer agrees with that conclusion. This technical review consisted of: an independent check of the methods and models employed, independent calculations application of ANSI/ANS 8.1, verification of WSRC Nuclear Criticality Safety Manual( 2 ) procedures

  15. Plant safety review from mass criticality accident

    International Nuclear Information System (INIS)

    Susanto, B.G.

    2000-01-01

    The review has been done to understand the resent status of the plant in facing postulated mass criticality accident. From the design concept of the plant all the components in the system including functional groups have been designed based on favorable mass/geometry safety principle. The criticality safety for each component is guaranteed because all the dimensions relevant to criticality of the components are smaller than dimensions of 'favorable mass/geometry'. The procedures covering all aspects affecting quality including the safety related are developed and adhered to at all times. Staff are indoctrinated periodically in short training session to warn the important of the safety in process of production. The plant is fully equipped with 6 (six) criticality detectors in strategic places to alert employees whenever the postulated mass criticality accident occur. In the event of Nuclear Emergency Preparedness, PT BATAN TEKNOLOGI has also proposed the organization structure how promptly to report the crisis to Nuclear Energy Control Board (BAPETEN) Indonesia. (author)

  16. Shift and night work and long working hours--a systematic review of safety implications.

    Science.gov (United States)

    Wagstaff, Anthony Sverre; Sigstad Lie, Jenny-Anne

    2011-05-01

    In order to devise effective preventive strategies, it is important to study workplace stressors that might increase the risk of workplace accidents - both affecting workers themselves as well as causing harm to third-parties. The aim of this report is to provide a systematic, updated overview and scientific review of empirical research regarding accidents in relation to long work hours and shift work, primarily based on epidemiological studies. The search for articles was part of a large review study on the effects of work hours on various health outcomes, safety, and performance. The search strategy included 5 international scientific databases, and nearly 7000 articles were initially identified using our search string. Following the application of inclusion and exclusion criteria, 443 publications were found and evaluated using a pre-defined scoring system. Of these, 43 concerned safety and accidents but only 14 were considered to be of high quality (total score 2 or 3 on a scale from 0-3) and therefore used for this study. Both shift work and long working hours present a substantial and well-documented detrimental effect on safety - all the studies that are included in this review have one or more significant findings in this respect. The trends are quite coherent although the increases in accident rates are mostly from 50% to 100%. In epidemiological terms, this may be seen as rather small differences. The use of such data is therefore only of importance if the accident incidence is high or if accidents may have large effects. The findings are most relevant to safety-critical activities such as the transport and health sectors. Work periods >8 hours carry an increased risk of accidents that cumulates, so that the increased risk of accidents at around 12 hours is twice the risk at 8 hours. Shift work including nights carries a substantial increased risk of accidents, whereas "pure" night work may bring some protection against this effect due to

  17. Traceability of Software Safety Requirements in Legacy Safety Critical Systems

    Science.gov (United States)

    Hill, Janice L.

    2007-01-01

    How can traceability of software safety requirements be created for legacy safety critical systems? Requirements in safety standards are imposed most times during contract negotiations. On the other hand, there are instances where safety standards are levied on legacy safety critical systems, some of which may be considered for reuse for new applications. Safety standards often specify that software development documentation include process-oriented and technical safety requirements, and also require that system and software safety analyses are performed supporting technical safety requirements implementation. So what can be done if the requisite documents for establishing and maintaining safety requirements traceability are not available?

  18. Canister storage building design basis accident analysis documentation

    Energy Technology Data Exchange (ETDEWEB)

    KOPELIC, S.D.

    1999-02-25

    This document provides the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  19. A Review of General Aviation Safety (1984-2017).

    Science.gov (United States)

    Boyd, Douglas D

    2017-07-01

    General aviation includes all civilian aviation apart from operations involving paid passenger transport. Unfortunately, this category of aviation holds a lackluster safety record, accounting for 94% of civil aviation fatalities. In 2014, of 1143 general aviation accidents, 20% were fatal compared with 0 of 29 airline mishaps in the United States. Herein, research findings over the past 30 yr will be reviewed. Accident risk factors (e.g., adverse weather, geographical region, post-impact fire, gender differences) will be discussed. The review will also summarize the development and implementation of stringent crashworthiness designs with multi-axis dynamic testing and head-injury protection and its impact on mitigating occupant injury severity. The benefits and drawbacks of new technology and human factor considerations associated with increased general aviation automation will be debated. Data on the safety of the aging general aviation population and increased drug usage will also be described. Finally, areas in which general aviation occupant survival could be improved and injury severity mitigated will be discussed with the view of equipping aircraft with 1) crash-resistant fuel tanks to reduce post-impact conflagration; 2) after-market ballistic parachutes for older aircraft; and 3) current generation electronic locator beacons to hasten site access by first responders.Boyd DD. A review of general aviation safety (1984-2017). Aerosp Med Hum Perform. 2017; 88(7):657-664.

  20. Overview of the Nuclear Regulatory Commission's safety research program

    International Nuclear Information System (INIS)

    Beckjord, E.S.

    1989-01-01

    Accomplishments during 1988 of the Office of Nuclear Regulatory Research and the program of safety research are highlighted, and plans, expections, and needs of the next year and beyond are discussed. Topics discussed include: ECCS Appendix K Revision; pressurized thermal shock; NUREG-1150, or the PRA method performance document; resolution of station blackout; severe accident integration plan; nuclear safety research review committee; and program management

  1. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  2. Review of actinide nitride properties with focus on safety aspects

    Energy Technology Data Exchange (ETDEWEB)

    Albiol, Thierry [CEA Cadarache, St Paul Lez Durance Cedex (France); Arai, Yasuo [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-12-01

    This report provides a review of the potential advantages of using actinide nitrides as fuels and/or targets for nuclear waste transmutation. Then a summary of available properties of actinide nitrides is given. Results from irradiation experiments are reviewed and safety relevant aspects of nitride fuels are discussed, including design basis accidents (transients) and severe (core disruptive) accidents. Anyway, as rather few safety studies are currently available and as many basic physical data are still missing for some actinide nitrides, complementary studies are proposed. (author)

  3. Safety management systems and their role in achieving high standards of operational safety

    International Nuclear Information System (INIS)

    Coulston, D.J.; Baylis, C.C.

    2000-01-01

    Achieving high standards of operational safety requires a robust management framework that is visible to all personnel with responsibility for its implementation. The structure of the management framework must ensure that all processes used to manage safety interlink in a logical and coherent manner, that is, they form a management system that leads to continuous improvement in safety performance. This Paper describes BNFL's safety management system (SMS). The SMS has management processes grouped within 5 main elements: 1. Policy, 2. Organisation, 3. Planning and Implementation, 4. Measuring and Reviewing Performance, 5. Audit. These elements reflect the overall process of setting safety objective (from Policy), measuring success and reviewing the performance. Effective implementation of the SMS requires senior managers to demonstrate leadership through their commitment and accountability. However, the SMS as a whole reflects that every employee at every level within BNFL is responsible for safety of operations under their control. The SMS therefore promotes a proactive safety culture and safe operations. The system is formally documented in the Company's Environmental, Health and Safety (EHS) Manual. Within in BNFL Group, the Company structures enables the Manual to provide overall SMS guidance and co-ordination to its range of nuclear businesses. Each business develops the SMS to be appropriate at all levels of its organisation, but ensuring that each level is consistent with the higher level. The Paper concludes with a summary of BNFL's safety performance. (author)

  4. Nuclear Safety Bureau. Annual Report 1996-1997

    International Nuclear Information System (INIS)

    1997-01-01

    Throughout the year the Nuclear Safety Bureau (NSB) continued its regulatory approach to monitor and review the safety of nuclear plant operated by the Australian Nuclear Science and Technology Organisation (ANSTO). This included an ongoing regime of safety audits against the authorised arrangements in ANSTO's safety documentation and the bureau's expectations for nuclear plant drawn from international best practice. The NSB invited the participation of officers of the Australian Radiation Laboratory in these audits. Aspects of ANSTO's operation of nuclear plant reviewed by the NSB included training and accreditation of operations staff, abnormal occurrences, modifications to plant and emergency arrangements and exercises for the Lucas Heights Science and Technology Centre. Audits of HIFAR were also conducted on operating logs, radiation protection and radioactive discharges. Based on the reviews and audits conducted by the NSB, and ANSTO's actions in responding to the bureau's requests and requirements for actions, the NSB concluded that ANSTO's nuclear plant operated safely throughout the year, and that risks to on-site personnel and the public were maintained at acceptably low levels

  5. Safety Justification and Safety Case for Safety-critical Software in Digital Reactor Protection System

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Jang-Soo; Jee, Eunkyoung

    2016-01-01

    Nuclear safety-critical software is under strict regulatory requirements and these regulatory requirements are essential for ensuring the safety of nuclear power plants. The verification & validation (V and V) and hazard analysis of the safety-critical software are required to follow regulatory requirements through the entire software life cycle. In order to obtain a license from the regulatory body through the development and validation of safety-critical software, it is essential to meet the standards which are required by the regulatory body throughout the software development process. Generally, large amounts of documents, which demonstrate safety justification including standard compliance, V and V, hazard analysis, and vulnerability assessment activities, are submitted to the regulatory body during the licensing process. It is not easy to accurately read and evaluate the whole documentation for the development activities, implementation technology, and validation activities. The safety case methodology has been kwon a promising approach to evaluate the level and depth of the development and validation results. A safety case is a structured argument, supported by a body of evidence that provides a compelling, comprehensible, and valid case that a system is safe for a given application in a given operating environment. It is suggested to evaluate the level and depth of the results of development and validation by applying safety case methodology to achieve software safety demonstration. A lot of documents provided as evidence are connected to claim that corresponds to the topic for safety demonstration. We demonstrated a case study in which more systematic safety demonstration for the target system software is performed via safety case construction than simply listing the documents

  6. Safety Justification and Safety Case for Safety-critical Software in Digital Reactor Protection System

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Kee-Choon; Lee, Jang-Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Jee, Eunkyoung [KAIST, Daejeon (Korea, Republic of)

    2016-10-15

    Nuclear safety-critical software is under strict regulatory requirements and these regulatory requirements are essential for ensuring the safety of nuclear power plants. The verification & validation (V and V) and hazard analysis of the safety-critical software are required to follow regulatory requirements through the entire software life cycle. In order to obtain a license from the regulatory body through the development and validation of safety-critical software, it is essential to meet the standards which are required by the regulatory body throughout the software development process. Generally, large amounts of documents, which demonstrate safety justification including standard compliance, V and V, hazard analysis, and vulnerability assessment activities, are submitted to the regulatory body during the licensing process. It is not easy to accurately read and evaluate the whole documentation for the development activities, implementation technology, and validation activities. The safety case methodology has been kwon a promising approach to evaluate the level and depth of the development and validation results. A safety case is a structured argument, supported by a body of evidence that provides a compelling, comprehensible, and valid case that a system is safe for a given application in a given operating environment. It is suggested to evaluate the level and depth of the results of development and validation by applying safety case methodology to achieve software safety demonstration. A lot of documents provided as evidence are connected to claim that corresponds to the topic for safety demonstration. We demonstrated a case study in which more systematic safety demonstration for the target system software is performed via safety case construction than simply listing the documents.

  7. Integrated plant safety assessment, Systematic Evaluation Program: Dresden Nuclear Power Station, Unit 2 (Docket No. 50-237)

    International Nuclear Information System (INIS)

    1989-10-01

    The US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to the final Integrated Plant Safety Assessment Report (IPSAR) (NUREG-0823), under the scope of the Systematic Evaluation Program (SEP), for the Commonwealth Edison Company (CECo) Dresden Nuclear Power Station, Unit 2 located in Grundy County, Illinois. The NRC initiated the SEP to provide the framework for reviewing the design of older operating nuclear reactor plants to reconfirm and document their safety. This report documents the review completed by means of the SEP for those issues that required refined engineering evaluations or the continuation of ongoing evaluations subsequent to issuing the final IPSAR for Dresden Unit 2. The review was provided for (1) an assessment of the significance of differences between current technical positions on selected issues and those that existed when Dresden Unit 2 was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. The final IPSAR and this supplement forms part of the bases for considering the conversion of the existing provisional operating license to a full-term operating license. 83 refs., 9 tabs

  8. Classification of antecedents towards safety use of health information technology: A systematic review.

    Science.gov (United States)

    Salahuddin, Lizawati; Ismail, Zuraini

    2015-11-01

    This paper provides a systematic review of safety use of health information technology (IT). The first objective is to identify the antecedents towards safety use of health IT by conducting systematic literature review (SLR). The second objective is to classify the identified antecedents based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model and an extension of DeLone and McLean (D&M) information system (IS) success model. A systematic literature review (SLR) was conducted from peer-reviewed scholarly publications between January 2000 and July 2014. SLR was carried out and reported based on the preferred reporting items for systematic reviews and meta-analyses (PRISMA) statement. The related articles were identified by searching the articles published in Science Direct, Medline, EMBASE, and CINAHL databases. Data extracted from the resultant studies included are to be analysed based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model, and also from the extended DeLone and McLean (D&M) information system (IS) success model. 55 articles delineated to be antecedents that influenced the safety use of health IT were included for review. Antecedents were identified and then classified into five key categories. The categories are (1) person, (2) technology, (3) tasks, (4) organization, and (5) environment. Specifically, person is attributed by competence while technology is associated to system quality, information quality, and service quality. Tasks are attributed by task-related stressor. Organisation is related to training, organisation resources, and teamwork. Lastly, environment is attributed by physical layout, and noise. This review provides evidence that the antecedents for safety use of health IT originated from both social and technical aspects. However, inappropriate health IT usage potentially increases the incidence of errors and produces new safety risks. The review cautions future

  9. Program Management at the National Nuclear Security Administration Office of Defense Nuclear Security: A Review of Program Management Documents and Underlying Processes

    International Nuclear Information System (INIS)

    Madden, Michael S.

    2010-01-01

    The scope of this paper is to review the National Nuclear Security Administration Office of Defense Nuclear Security (DNS) program management documents and to examine the underlying processes. The purpose is to identify recommendations for improvement and to influence the rewrite of the DNS Program Management Plan (PMP) and the documentation supporting it. As a part of this process, over 40 documents required by DNS or its stakeholders were reviewed. In addition, approximately 12 other documents produced outside of DNS and its stakeholders were reviewed in an effort to identify best practices. The complete list of documents reviewed is provided as an attachment to this paper.

  10. 41 CFR 128-1.8009 - Review of Seismic Safety Program.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Review of Seismic Safety Program. 128-1.8009 Section 128-1.8009 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program...

  11. Additional safety assessments, follow-up of stress tests of the French nuclear power stations. Action plan of the nuclear safety authority

    International Nuclear Information System (INIS)

    2012-01-01

    This document presents the French national action plan defined by the Nuclear Safety Authority (ASN) in compliance with the recommendations made by the ENSREG (European nuclear safety regulators group). It refers to decisions taken at the national level after the Fukushima accident, recommendations after European stress tests, and recommendations after the extraordinary meeting of contracting parties at the Convention on Nuclear Safety of August 2012. For different topics, this document recalls the recommendations made by the peer review, indicates the ASN's opinion and progress or ASN's requirements for different power stations. The first part addresses the recommendations made by peers and based on the European review. Topics concern natural hazards (effects, detection, inspections and controls related to earthquakes, margin assessment with respect to flooding and natural hazards), the loss of safety systems (cooling systems, electricity supplies, actions, instruments, training, and so on), the management of a severe accident (reference levels, measures, guides, exercises, training, management of contaminated water, radiation protection, premises). The second part deals with topics addressed within the frame of the Convention: national organisations, organisations in an emergency and post-accidental situation, international cooperation. A third part addresses the follow-up of additional measures issued by the ASN

  12. IAEA safety fundamentals: the safety of nuclear installations and the defence in depth concept

    International Nuclear Information System (INIS)

    Aro, I.

    2005-01-01

    This presentation is a replica of the similar presentation provided by the IAEA Basic Professional Training Course on Nuclear Safety. The presentation utilizes the IAEA Safety Series document No. 110, Safety Fundamentals: the Safety of Nuclear Installations. The objective of the presentation is to provide the basic rationale for actions in provision of nuclear safety. The presentation also provides basis to understand national nuclear safety requirements. There are three Safety Fundamentals documents in the IAEA Safety Series: one for nuclear safety, one for radiation safety and one for waste safety. The IAEA is currently revising its Safety Fundamentals by combining them into one general Safety Fundamentals document. The IAEA Safety Fundamentals are not binding requirements to the Member States. But, a very similar text has been provided in the Convention on Nuclear Safety which is legally binding for the Member State after ratification by the Parliament. This presentation concentrates on nuclear safety. The Safety Fundamentals documents are the 'policy documents' of the IAEA Safety Standards Series. They state the basic objectives, concepts and principles involved in ensuring protection and safety in the development and application of atomic energy for peaceful purposes. They will state - without providing technical details and without going into the application of principles - the rationale for actions necessary in meeting Safety Requirements. Chapter 7 of this presentation describes the basic features of defence in depth concept which is referred to in the Safety Fundamentals document. The defence in depth concept is a key issue in reaching high level of safety specifically at the design stage but as the reader can see the extended concept also refers to the operational stage. The appendix has been taken directly from the IAEA Basic Professional Training Course on Nuclear Safety and applied to the Finnish conditions. The text originates from the references

  13. NASA Aviation Safety Program Systems Analysis/Program Assessment Metrics Review

    Science.gov (United States)

    Louis, Garrick E.; Anderson, Katherine; Ahmad, Tisan; Bouabid, Ali; Siriwardana, Maya; Guilbaud, Patrick

    2003-01-01

    The goal of this project is to evaluate the metrics and processes used by NASA's Aviation Safety Program in assessing technologies that contribute to NASA's aviation safety goals. There were three objectives for reaching this goal. First, NASA's main objectives for aviation safety were documented and their consistency was checked against the main objectives of the Aviation Safety Program. Next, the metrics used for technology investment by the Program Assessment function of AvSP were evaluated. Finally, other metrics that could be used by the Program Assessment Team (PAT) were identified and evaluated. This investigation revealed that the objectives are in fact consistent across organizational levels at NASA and with the FAA. Some of the major issues discussed in this study which should be further investigated, are the removal of the Cost and Return-on-Investment metrics, the lack of the metrics to measure the balance of investment and technology, the interdependencies between some of the metric risk driver categories, and the conflict between 'fatal accident rate' and 'accident rate' in the language of the Aviation Safety goal as stated in different sources.

  14. SAFETY INSTRUCTION AND SAFETY NOTE

    CERN Multimedia

    TIS Secretariat

    2002-01-01

    Please note that the SAFETY INSTRUCTION N0 49 (IS 49) and the SAFETY NOTE N0 28 (NS 28) entitled respectively 'AVOIDING CHEMICAL POLLUTION OF WATER' and 'CERN EXHIBITIONS - FIRE PRECAUTIONS' are available on the web at the following urls: http://edms.cern.ch/document/335814 and http://edms.cern.ch/document/335861 Paper copies can also be obtained from the TIS Divisional Secretariat, email: TIS.Secretariat@cern.ch

  15. Safety assessment document for spent fuel handling, packaging, and storage demonstrations at the E-MAD facility on the Nevada Test Site

    International Nuclear Information System (INIS)

    1985-04-01

    The objectives for spent fuel handling and packaging demonstration are to develop the capability to satisfactorily encapsulate typical commercial nuclear reactor spent fuel assemblies and to establish the suitability of interim dry surface and near surface storage concepts. To accomplish these objectives, spent fuel assemblies from a pressurized water reactor have been received, encapsulated in steel canisters, and emplaced in on-site storage facilities and subjected to other tests. As an essential element of these demonstrations, a thorough safety assessment of the demonstration activities conducted at the E-MAD facility has been completed. This document describes the site location and characteristics, the existing E-MAD facility, and the facility modifications and equipment additions made specifically for the demonstrations. The document also summarizes the Quality Assurance Program utilized, and specifies the principal design criteria applicable to the facility modifications, equipment additions, and process operations. Evaluations have been made of the radiological impacts of normal operations, abnormal operations, and postulated accidents. Analyses have been performed to determine the affects on nuclear criticality safety of postulated accidents and credible natural phenomena. The consequences of postulated accidents resulting in fission product gas release have also been estimated. This document identifies the engineered safety features, procedures, and site characteristics that (1) prevent the occurrence of potential accidents or (2) assure that the consequences of postulated accidents are either insignificant or adequately mitigated

  16. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    This document describes the calculations performed to determine the accident consequences for the W-058 safety analysis. Project W-058 is the replacement cross site transfer system (RCSTS), which is designed to transort liquid waste between the 200 W and 200 E areas. Calculations for RCSTS safety analyses used the same methods as the calculations for the Tank Waste Remediation System (TWRS) Basis for Interim Operation (BIO) and its supporting calculation notes. Revised analyses were performed for the spray and pool leak accidents since the RCSTS flows and pressures differ from those assumed in the TWRS BIO. Revision 1 of the document incorporates review comments

  17. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  18. 75 FR 54915 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2010-09-09

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Justice. ACTION... Officer Medal of Valor Review Board to vote on recommendations for the 2009-2010 Medal of Valor... Public Safety Officer Medal of Valor Review Board carries out those advisory functions specified in 42 U...

  19. Overview of the periodic safety review of nuclear power plants as practised in India

    International Nuclear Information System (INIS)

    Jhamb, N.K.; Chande, S.K.

    1997-01-01

    In India, routine and periodic safety reviews of nuclear facilities are carried out through a multitiered hierarchy of committees at the plant level, the operating organization level and the regulatory body level. In 1993, it was decided by the Atomic Energy Regulatory Board (AERB, the regulatory body) that, as a policy, authorization for operation of nuclear power plants (NPPs) shall have a validity period of 5 years, after which this authorization will have to be renewed. NPPs have to carry out a self-assessment according to an established procedure, prepare a Safety Assessment Report for Renewal of Authorization (SARRA) and submit it to the AERB for review. The procedure defines the objectives of the report and gives guidelines on the required review of the self-assessment of the operational plant safety. The paper discusses the objectives, the elements of the SARRA review, the review process, the SARRA review carried out in 1993-1994, the basis for acceptability of continued plant operation, and the lessons learned for future periodic safety reviews in India and for exchange of operating experience feedback. (author)

  20. General safety considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This document presents the full filling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 4 of the document contains some details about the priority to safety, financial and human resources, human factors, quality assurance, safety assessment and verification, radiation protection and emergency preparedness.

  1. General safety considerations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the full filling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 4 of the document contains some details about the priority to safety, financial and human resources, human factors, quality assurance, safety assessment and verification, radiation protection and emergency preparedness

  2. General safety considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    This document presents the full filling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 4 of the document contains some details about the priority to safety, financial and human resources, human factors, quality assurance, safety assessment and verification, radiation protection and emergency preparedness.

  3. General safety considerations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the full filling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 4 of the document contains some details about the priority to safety, financial and human resources, human factors, quality assurance, safety assessment and verification, radiation protection and emergency preparedness

  4. Classification of Aeronautics System Health and Safety Documents

    Data.gov (United States)

    National Aeronautics and Space Administration — Most complex aerospace systems have many text reports on safety, maintenance, and associated issues. The Aviation Safety Reporting System (ASRS) spans several...

  5. Convention on nuclear safety. Rules of procedure and financial rules

    International Nuclear Information System (INIS)

    1998-01-01

    The document presents the Rules of Procedure and Financial Rules that apply mutatis mutandis to any meeting of the Contracting Parties to the Convention on Nuclear Safety (INFCIRC/449) convened in accordance with Chapter 3 of the Convention. It includes four parts: General provisions, Preparatory process for review meetings, Review meetings, and Amendment and interpretation of rules

  6. General safety basis development guidance for environmental restoration decontamination and decommissioning

    International Nuclear Information System (INIS)

    Ellingson, D.R.; Kerr, N.; Bohlander, K.; Hansen, J.; Crowley, W.

    1994-02-01

    Safety analyses have the objective of contributing to two essential ingredients of a successful operation. The first is promoting the safety of the operation through worker involvement in information development (safety basis). The second is obtaining approval to conduct the operation (authorization). Typically these ingredients are assembled under separate programs covered by separate DOE requirements. DOE authorization relies on successful development of a document containing up to 21 topics written in terms and language suited to reviewers and approvers. Safety relies on successful training and procedures that convert the technical documented information into terms and language understandable to the worker. This separation can lead to successful incorporation of one ingredient independent of the other. At best, this separation may result in a safe but unauthorized operation; at worst, the separation may result in an unsafe operation authorized to proceed. This guide is based on experiences gained by contractors who have integrated rather than separated the safety and authorization. The short duration of ER/D ampersand D activities, the uncertainties of hazards, and the publicly expressed desire for demonstrable progress in cleanup activities add emphasis to the need to integrate rather than separate and develop new programs. Experience-based information has been useful to workers, safety analysis practitioners, and reviewers in the following ways: (1) Acquiring or developing the needed information in a useful form; (2) Managing the uncertainties during activity development and operation; (3) Identifying the subset of applicable requirements for an activity; (4) Developing the appropriate level of documentation detail for a specific activity; and (5) Increasing the usefulness and use of safety analysis (ownership)

  7. NRU licence extension via integrated safety review

    Energy Technology Data Exchange (ETDEWEB)

    Mantifel, N. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2014-07-01

    The National Research Reactor, NRU at AECL Chalk River Laboratories achieved first criticality in November 1957. The completion of an Integrated Safety Review (ISR) in 2011, and subsequent Global Assessment Report (GAR), and Integrated Implementation Plan (IIP) has given confidence in the safe and reliable operation of NRU, therefore extending the licensing case to safely and reliably operate NRU until 2021 and beyond (64+ years of operation). The key vehicle to achieve this confidence is the IIP, that resulted from the ISR. NRU's IIP is a 10 year plan that addresses the gaps identified in the ISR between modern codes and standards in a prioritized approach. AECL is currently in year 3 of the IIP execution, is on or ahead of schedule to complete the identified improvements. The IIP in conjunction with a License Condition Handbook has replaced the licensing protocol with the Canadian Nuclear Safety Commission, (CNSC). Execution of the IIP to plan supports the continued safe operation of NRU. The ISR was carried out with the recognition that the NRU reactor is a research and isotope producing reactor approaching license renewal and not a power reactor undergoing refurbishment and life extension. Therefore, the IIP is being executed while NRU continues to deliver on its three missions: production of medical isotopes, support for fuels and materials research, and serving as a high flux neutron source in support of research relying on neutron scattering. The IIP is grouped into 5 Global Issue Groups, (GIGs) to support focused execution. The activities and tasks within the five GIGs are being executed via a matrix organization through the use of the Chalk River Laboratories Corrective Action Program to ensure the assignment of actions, completion and evidence to support closure is documented and retained. This paper discusses the approach taken by AECL to license and ensure safe, reliable operation of NRU until 2021 and beyond. (author)

  8. IAEA Issues Report on Mission to Review Japan's Nuclear Power Plant Safety Assessment Process

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: A team of international nuclear safety experts has delivered its report on a mission it conducted from 21-31 January 2012 to review Japan's process for assessing nuclear safety at the nation's nuclear power plants. International Atomic Energy Agency (IAEA) officials delivered the IAEA Mission Report to Japanese officials yesterday and made it publicly available today. Following the 11 March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station, Japan's Nuclear and Industrial Safety Agency (NISA) announced the development of a revised safety assessment process for the nation's nuclear power reactors. At the request of the Government of Japan, the IAEA organized a team of five IAEA and three international nuclear safety experts and visited Japan to review NISA's approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. A Preliminary Summary Report was issued on 31 January. 'The mission report provides additional information regarding the team's recommendations and overall finding that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, Director of the IAEA's Nuclear Installation Safety Division. National safety assessments and their peer review by the IAEA are a key component of the IAEA Action Plan on Nuclear Safety, which was approved by the Agency's Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. The IAEA safety review mission held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety Organization (JNES), and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. In its report delivered today

  9. The safety evaluation guide for laboratories and plants a tool for enhancing safety

    International Nuclear Information System (INIS)

    Lhomme, Veronique; Daubard, Jean-Paul

    2013-01-01

    of safety file (safety options file, general operating rules, on site emergency plan, periodic safety review documents, incident analysis...). In each chapter, the aforesaid Parts 1, 2 and 3 are developed. A first draft of the guide was published in March 2010 for use by assessment's teams of IRSN, and to obtain an operational feedback to improve it. Beyond that, the guide is also intended to be, on the topic of safety assessment for the fuel cycle facilities, laboratories, irradiators, particle accelerators, under-decommissioning reactors and radioactive waste management, a tool for tutoring (inside and outside the IRSN) and a reference to make available, outside of the IRSN, the approach of expertise and the 'know-how' of IRSN. In this context, the IRSN's methodology of assessment regarding 'criticality' and 'fire' have been put online, on the IRSN's web site. The paper presents the purpose and the structure of the guide and its interest for the safety assessment of fuel cycle facilities; in this frame, the chapters 'Assessment of the risk from handling operations' and 'Assessment of the periodic safety review documents' are presented in details as illustrations. It gives also information about its others uses. (authors)

  10. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan [Swedish Radiation Protection Authority, Stockholm (Sweden); Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report.

  11. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    International Nuclear Information System (INIS)

    CROWE, R.D.; PIEPHO, M.G.

    2000-01-01

    This document provided the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report''. All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  12. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    International Nuclear Information System (INIS)

    CROWE, R.D.

    1999-01-01

    This document provides the detailed accident analysis to support ''HNF-3553, Spent Nuclear Fuel Project Final Safety, Analysis Report, Annex A,'' ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  13. Instructions for submittal and control of FFTF design documents and design related documentation

    International Nuclear Information System (INIS)

    Grush, R.E.

    1976-10-01

    This document provides the system and requirements for management of FFTF technical data prepared by Westinghouse Hanford (HEDL), and design contractors, the construction contractor and lower tier equipment suppliers. Included in this document are provisions for the review, approval, release, change control, and accounting of FFTF design disclosure and base documentation. Also included are provisions for submittal of other design related documents for review and approval consistent with applicable requirements of RDT-Standard F 2-2, ''Quality Assurance Program Requirements.''

  14. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  15. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  16. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  17. K Basin safety analysis

    International Nuclear Information System (INIS)

    Porten, D.R.; Crowe, R.D.

    1994-01-01

    The purpose of this accident safety analysis is to document in detail, analyses whose results were reported in summary form in the K Basins Safety Analysis Report WHC-SD-SNF-SAR-001. The safety analysis addressed the potential for release of radioactive and non-radioactive hazardous material located in the K Basins and their supporting facilities. The safety analysis covers the hazards associated with normal K Basin fuel storage and handling operations, fuel encapsulation, sludge encapsulation, and canister clean-up and disposal. After a review of the Criticality Safety Evaluation of the K Basin activities, the following postulated events were evaluated: Crane failure and casks dropped into loadout pit; Design basis earthquake; Hypothetical loss of basin water accident analysis; Combustion of uranium fuel following dryout; Crane failure and cask dropped onto floor of transfer area; Spent ion exchange shipment for burial; Hydrogen deflagration in ion exchange modules and filters; Release of Chlorine; Power availability and reliability; and Ashfall

  18. Reviewing surveillance activities in nuclear power plants

    International Nuclear Information System (INIS)

    1989-03-01

    This document provides guidance to Operational Safety Review Teams (OSARTs) for reviewing surveillance activities at a nuclear power plant. In addition, the document contains reference material to support the review of surveillance activities, to assist within the Technical Support area and to ensure consistency between individual reviews. Drafts of the document have already been used on several OSART missions and found to be useful. The document first considers the objectives of an excellent surveillance programme. Investigations to determine the quality of the surveillance programme are then discussed. The attributes of an excellent surveillance programme are listed. Advice follows on how to phrase questions so as to obtain an informative response on surveillance features. Finally, specific equipment is mentioned that should be considered when reviewing functional tests. Four annexes provide examples drawn from operating nuclear power plants. They were selected to supplement the main text of the document with the best international practices as found in OSART reviews. They should in no way limit the acceptance and development of alternative approaches that lead to equivalent or better results. Refs, figs and tabs

  19. A Review of Research on Driving Styles and Road Safety.

    Science.gov (United States)

    Sagberg, Fridulv; Selpi; Piccinini, Giulio Francesco Bianchi; Engström, Johan

    2015-11-01

    The aim of this study was to outline a conceptual framework for understanding driving style and, on this basis, review the state-of-the-art research on driving styles in relation to road safety. Previous research has indicated a relationship between the driving styles adopted by drivers and their crash involvement. However, a comprehensive literature review of driving style research is lacking. A systematic literature search was conducted, including empirical, theoretical, and methodological research, on driving styles related to road safety. A conceptual framework was proposed whereby driving styles are viewed in terms of driving habits established as a result of individual dispositions as well as social norms and cultural values. Moreover, a general scheme for categorizing and operationalizing driving styles was suggested. On this basis, existing literature on driving styles and indicators was reviewed. Links between driving styles and road safety were identified and individual and sociocultural factors influencing driving style were reviewed. Existing studies have addressed a wide variety of driving styles, and there is an acute need for a unifying conceptual framework in order to synthesize these results and make useful generalizations. There is a considerable potential for increasing road safety by means of behavior modification. Naturalistic driving observations represent particularly promising approaches to future research on driving styles. Knowledge about driving styles can be applied in programs for modifying driver behavior and in the context of usage-based insurance. It may also be used as a means for driver identification and for the development of driver assistance systems. © 2015, Human Factors and Ergonomics Society.

  20. TECHNICAL BASIS DOCUMENT FOR NATURAL EVENT HAZARDS

    International Nuclear Information System (INIS)

    KRIPPS, L.J.

    2006-01-01

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls

  1. The IAEA radioactive waste safety standards programme

    International Nuclear Information System (INIS)

    Tourtellotte, James R.

    1995-01-01

    The IAEA is currently reviewing more than thirty publications in its Safety Series with a view toward consolidating and organizing information pertaining to radioactive waste. the effort is entitled Radioactive Waste Safety Standards programme (RADWASS). RADWASS is a significant undertaking and may have far reaching effects on radioactive waste management both in the international nuclear community and in individual nuclear States. This is because IAEA envisions the development of a consensus on the final document. In this circumstance, the product of RADWASS may ultimately be regarded as an international norm against which future actions of Member States may be measured. This program is organized in five subjects: planning, pre-disposal, disposal, uranium and thorium waste management and decommissioning, which has four levels: safety fundamentals, safety standards, safety guides and safety practices. (author)

  2. Immunization Safety Review: Thimerosal - Containing Vaccines and Neurodevelopmental Disorders

    National Research Council Canada - National Science Library

    Stratton, Kathleen; Gable, Alicia; McCormick, Marie C

    2001-01-01

    In this report, the Immunization Safety Review committee examines the hypothesis of whether or not the use of vaccines containing the preservative thimerosal can cause neurodevelopmental disorders (NDDs...

  3. A probabilistic safety assessment PEER review: Case study on the use of probabilistic safety assessment for safety decisions

    International Nuclear Information System (INIS)

    1989-10-01

    The purpose of this case study is to illustrate, using an actual example, the organizing and carrying out of an independent peer review of a draft full-scope (level 3) probabilistic safety assessment. The specific findings of the peer review are of less importance than the approach taken, the interaction between sponsor and study team, and the technical and administrative issues that can arise during a peer review. This case study will examine the following issues: how the scope of the peer review was established, based on how it was to be used by the review sponsoring body; how the level of effort was determined, and what this determination meant for the technical quality of the review; how the team of peer reviewers was selected; how the review itself was carried out; what findings were made; what was done with these findings by both the review sponsoring body and the PSA analysis team. 9 refs, 2 figs, 1 tab

  4. Safety analysis report for the Waste Storage Facility. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Bengston, S.J.

    1994-05-01

    This safety analysis report outlines the safety concerns associated with the Waste Storage Facility located in the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The three main objectives of the report are: define and document a safety basis for the Waste Storage Facility activities; demonstrate how the activities will be carried out to adequately protect the workers, public, and environment; and provide a basis for review and acceptance of the identified risk that the managers, operators, and owners will assume.

  5. ITER safety

    International Nuclear Information System (INIS)

    Raeder, J.; Piet, S.; Buende, R.

    1991-01-01

    As part of the series of publications by the IAEA that summarize the results of the Conceptual Design Activities for the ITER project, this document describes the ITER safety analyses. It contains an assessment of normal operation effluents, accident scenarios, plasma chamber safety, tritium system safety, magnet system safety, external loss of coolant and coolant flow problems, and a waste management assessment, while it describes the implementation of the safety approach for ITER. The document ends with a list of major conclusions, a set of topical remarks on technical safety issues, and recommendations for the Engineering Design Activities, safety considerations for siting ITER, and recommendations with regard to the safety issues for the R and D for ITER. Refs, figs and tabs

  6. Recommendations and comments on the report of the Ontario Nuclear Safety Review

    International Nuclear Information System (INIS)

    1988-12-01

    The report of the Ontario Nuclear Safety Review (ONSR) prepared by Dr. F. Kenneth Hare in March 1988, is reviewed by the Advisory Committee on Nuclear Safety (ACNS) to assess for the Atomic Energy Control Board the relevance and importance of the ONSR recommendations and comments. The ACNS conclusions from this study are embodied in nineteen recommendations, as well as several suggestions and some specific comments

  7. IAEA Team Concludes Peer Review of Greece's Regulatory Framework for Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts yesterday concluded an 11-day mission to review the regulatory framework for nuclear and radiation safety in Greece. The Integrated Regulatory Review Service (IRRS) mission, which was conducted at the request of the Government of the Hellenic Republic, noted good practices in the country's nuclear regulatory system and also identified issues for improvement for the Greek Atomic Energy Commission (GAEC) and the Greek competent authorities. These are aimed at strengthening the effectiveness of the country's regulatory framework and functions in line with IAEA Safety Standards. ''The IRRS team enjoyed excellent cooperation from the GAEC throughout its mission,'' said Tom Ryan, mission leader and Director of Regulations and Information Management at the Radiological Protection Institute of Ireland. ''The GAEC staff were very open and candid in their discussions and provided the fullest practicable assistance.'' The main observations of the IRRS Review team included: While the Greek Government's commitment to safety is being demonstrated through its actions, the development of a comprehensive national policy and strategy expressed in a consolidated statement would provide a valuable framework and guidance for future actions in terms of safety; and GAEC has effective independence. The Greek government has ensured that GAEC is effectively independent in its safety-related decision-making and that it has functional separation from entities having responsibility or interests that could unduly influence its decision making. Strengths and good practices identified by the IRRS team included: Greece actively participates in the global safety regime including all relevant safety conventions; The nation's radiation monitoring system for the detection of illicit trafficking contributes significantly to identifying potential radiation emergencies due to events within or outside the country

  8. Energy Storage System Safety: Plan Review and Inspection Checklist

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Pam C (PNNL); Conover, David R (PNNL)

    2017-03-01

    Codes, standards, and regulations (CSR) governing the design, construction, installation, commissioning, and operation of the built environment are intended to protect the public health, safety, and welfare. While these documents change over time to address new technology and new safety challenges, there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until the codes and standards are adopted. Until existing model codes and standards are updated or new ones are developed and then adopted, one seeking to deploy energy storage technologies or needing to verify the safety of an installation may be challenged in trying to apply currently implemented CSRs to an energy storage system (ESS). The Energy Storage System Guide for Compliance with Safety Codes and Standards1 (CG), developed in June 2016, is intended to help address the acceptability of the design and construction of stationary ESSs, their component parts, and the siting, installation, commissioning, operations, maintenance, and repair/renovation of ESS within the built environment.

  9. [Evidence-based effectiveness of road safety interventions: a literature review].

    Science.gov (United States)

    Novoa, Ana M; Pérez, Katherine; Borrell, Carme

    2009-01-01

    Only road safety interventions with scientific evidence supporting their effectiveness should be implemented. The objective of this study was to identify and summarize the available evidence on the effectiveness of road safety interventions in reducing road traffic collisions, injuries and deaths. All literature reviews published in scientific journals that assessed the effectiveness of one or more road safety interventions and whose outcome measure was road traffic crashes, injuries or fatalities were included. An exhaustive search was performed in scientific literature databases. The interventions were classified according to the evidence of their effectiveness in reducing road traffic injuries (effective interventions, insufficient evidence of effectiveness, ineffective interventions) following the structure of the Haddon matrix. Fifty-four reviews were included. Effective interventions were found before, during and after the collision, and across all factors: a) the individual: the graduated licensing system (31% road traffic injury reduction); b) the vehicle: electronic stability control system (2 to 41% reduction); c) the infrastructure: area-wide traffic calming (0 to 20%), and d) the social environment: speed cameras (7 to 30%). Certain road safety interventions are ineffective, mostly road safety education, and others require further investigation. The most successful interventions are those that reduce or eliminate the hazard and do not depend on changes in road users' behavior or on their knowledge of road safety issues. Interventions based exclusively on education are ineffective in reducing road traffic injuries.

  10. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; and Bzostek, J.

    2009-09-30

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M&T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M&Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M&Ts. The M&Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M&Ts for each trend, and (2) whether M&Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M&T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  11. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; Bzostek, J.

    2009-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M and T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M and Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M and Ts. The M and Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M and Ts for each trend, and (2) whether M and Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M and T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  12. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  13. Nuclear Safety Review for the Year 2007

    International Nuclear Information System (INIS)

    2008-07-01

    In 2007, the 50th anniversary year of the Agency, the safety performance of the nuclear industry, on the whole, remained high, although incidents and accidents with no significant impact on public health and safety continue to make news headlines and challenge operators and regulators. It is therefore essential to maintain vigilance, continuously improve safety culture and enhance the international sharing and utilization of operating and other safety experience, including that resulting from natural events. The establishment and sustainability of infrastructures for all aspects of nuclear, radiation, transport and waste safety will remain a high priority. Member States embarking on nuclear power programmes will need to be active participants in the global nuclear safety regime. Harmonized safety standards, the peer review mechanism among contracting parties of the safety conventions, and sharing safety knowledge and best practices through networking are key elements for the continuous strengthening of the global nuclear safety regime. Technical and scientific support organizations (TSOs), whether part of the regulatory body or a separate organization, are gaining increased importance by providing the technical and scientific basis for safety related decisions and activities. There is a need for enhanced interaction and cooperation between TSOs. Academic and industrial expert communities also play a vital role in improving safety cooperation and capacity building. Countries embarking on nuclear power programmes, as well as countries expanding existing programmes, have to meet the challenge of building a technically qualified workforce. A vigorous knowledge transfer programme is key to capacity building - particularly in view of the ageing of experienced professionals in the nuclear field. National and regional safety networks, and ultimately a global safety network will greatly help these efforts. Changes in world markets and technology are having an impact on both

  14. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  15. Preliminary safety analysis report for the Waste Characterization Facility

    International Nuclear Information System (INIS)

    1994-10-01

    This safety analysis report outlines the safety concerns associated with the Waste Characterization Facility located in the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The three main objectives of the report are to: define and document a safety basis for the Waste Characterization Facility activities; demonstrate how the activities will be carried out to adequately protect the workers, public, and environment; and provide a basis for review and acceptance of the identified risk that the managers, operators, and owners will assume. 142 refs., 38 figs., 39 tabs

  16. REVIEW OF SAFETY AND TOLERANCE OF OMALIZUMAB

    Directory of Open Access Journals (Sweden)

    A.V. Emel'yanov

    2008-01-01

    Full Text Available The review of safety of monoclonal anti-ige-antibodies (xolair — a new medication for the treatment of severe allergic bronchial asthma is presented. Local and system adverse events, originating after injection of medicament in clinical studies and following administration in patients are discussed.Key words: children, bronchial asthma, monoclonal anti Ige antibodies.

  17. Experience in the review of utility control room design review and safety parameter display system programs

    International Nuclear Information System (INIS)

    Moore, V.A.

    1985-01-01

    The Detailed Control Room Design Review (DCRDR) and the Safety Parameter Display System (SPDS) had their origins in the studies and investigations conducted as the result of the TMI-2 accident. The President's Commission (Kemeny Commission) critized NRC for not examining the man-machine interface, over-emphasizing equipment, ignoring human beings, and tolerating outdated technology in control rooms. The Commission's Special Inquiry Group (Rogovin Report) recommended greater application of human factors engineering including better instrumentation displays and improved control room design. The NRC Lessons Learned Task Force concluded that licensees should review and improve control rooms using NRC Human engineering guidelines, and install safety parameter display systems (then called the safety staff vector). The TMI Action Plan Item I.D.1 and I.D.2 were based on these recommendations

  18. Audit of data and code use in the SR-Can safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hicks, T.W.; Baldwin, T.D. [Galson Sciences Ltd, 5 Grosvenor House, Melton R oad, Oakham, Rutland LE15 6AX (United Kingdom)

    2008-03-15

    assessment should be obtained from controlled sources or suitable external references such as textbooks or peer-reviewed journals. Information should be provided on how data are managed and controlled such that the data are selected and used appropriately in safety assessment calculations. Procedures for ensuring that controlled and quality assured data and parameter values are obtained for use in the safety assessment should be explained. - Comprehensive references to controlled data sources and documentation on data abstraction to derive parameter values for all data sets should be included in the Data Report. The Data Report should become the primary reference for data and parameter values used in the safety assessment to build confidence that data and parameter values are used consistently and traceable throughout the safety assessment. - Information on the review criteria or procedures used by SKB to determine whether a particular data set is acceptable for use in the safety assessment should be provided. Procedures for accepting data for use in the safety assessment should include a check that the data qualification process has been documented, and confirmation that data were acquired under appropriate quality assurance procedures or that suitable data qualification methods have been applied (such as confirmation testing, peer review, or independent technical assessment). - To build confidence in SKB's process of review and approval of safety assessment reports, information should be provided on the method of selection of reviewers, the review criteria, the process of comment resolution, and the availability of review records. - The role of each code used in the safety assessment should be explained in the Model Summary Report, with cross-references to where associated features, events, and processes, input data, and code applications are presented, and to where results are used in the safety assessment documentation, possibly through greater use of the Assessment

  19. OPG waterways public safety program

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Ontario Power Generation Inc., Niagara Falls, ON (Canada)

    2009-07-01

    Ontario Power Generation (OPG) has 64 hydroelectric generating stations, 241 dams, and 109 dams in Ontario's registry with the International Commission on Large Dams (ICOLD). In 1986, it launched a formal dam safety program. This presentation addressed the importance of public safety around dams. The safety measures are timely because of increasing public interaction around dams; the public's unawareness of hazards; public interest in extreme sports; easier access by recreational vehicles; the perceived right of public to access sites; and the remote operation of hydroelectric stations. The presentation outlined the OPG managed system approach, with particular reference to governance; principles; standards and procedures; and aspects of implementation. Specific guidelines and governing documents for public safety around dams were identified, including guidelines for public safety of waterways; booms and buoys; audible warning devices and lights; public safety signage; fencing and barricades; and risk assessment for public safety around waterways. The presentation concluded with a discussion of audits and management reviews to determine if safety objectives and targets have been met. figs.

  20. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.