  1. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  2. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    Energy Technology Data Exchange (ETDEWEB)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.

  3. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    International Nuclear Information System (INIS)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included

  4. Williamsport Area Community College Long Range Planning: The Long Range Plan, Update 1987.

    Science.gov (United States)

    Williamsport Area Community Coll., PA.

    This update to Williamsport Area Community College's (WACC's) 1984-89 long-range plan offers a status report on each of the plan's 78 objectives, reassigns responsibility for specific objectives to make the plan responsive to the current organizational structure of the college, and offers 11 new objectives for the 1986-87 academic year. After…

  5. Down the Road...Long Range Planning for Automation.

    Science.gov (United States)

    Texas State Library, Austin. Dept. of Library Development.

    The materials in this manual/workbook were prepared to assist participants in a workshop on long-range planning for library automation. Chapters cover the following topics: (1) "What Is Long-Range Planning?" (2) "Why Plan?" (3) "Who Needs to Participate?" (4) "Planning to Plan"; (5) "Determining Needs"; (6) "Description and Introduction"; (7)…

  6. Report of the Long-Range Planning Committee

    International Nuclear Information System (INIS)

    1984-01-01

    This is the final report of the Long-Range Planning Committee of the Lawrence Livermore National Laboratory. It describes the make-up, purpose, working assumptions, and activities of the Committee and discusses the work done by the Committee on defense matters, energy, a number of additional topics, and future long-range planning activities

  7. Look Ahead: Long-Range Learning Plans

    Science.gov (United States)

    Weinstein, Margery

    2010-01-01

    Faced with an unsteady economy and fluctuating learning needs, planning a learning strategy designed to last longer than the next six months can be a tall order. But a long-range learning plan can provide a road map for success. In this article, four companies (KPMG LLP, CarMax, DPR Construction, and EMC Corp.) describe their learning plans, and…

  8. A Model for Long Range Planning for Seminole Community College.

    Science.gov (United States)

    Miner, Norris

    A model for long-range planning designed to maximize involvement of college personnel, to improve communication among various areas of the college, to provide a process for evaluation of long-range plans and the planning process, to adjust to changing conditions, to utilize data developed at a level useful for actual operations, and to have…

  9. The third stage of hospital long-range planning: the marketing approach.

    Science.gov (United States)

    Rynne, T J

    1980-01-01

    Today most hospital administrators are convinced they should implement long-range planning. The marketing approach to long-range planning is an effective strategy that is consumer oriented. It starts the planning process with the consumer, letting the consumer's needs and wants guide the organization's planning.

  10. INEL D&D long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Buckland, R.J.; Kenoyer, D.J.; LaBuy, S.A.

    1995-09-01

    This Long-Range Plan presents the Decontamination and Dismantlement (D&D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D&D Program objectives, management criteria, and policy; discusses current activities; and documents the INEL D&D Program cost and schedule estimate projections for the next 15 years. Appendices are included that provide INEL D&D project historical information, a comprehensive descriptive summary of each current D&D surplus facility, and a summary database of all INEL contaminated facilities awaiting or undergoing the facility transition process.

  11. Long-range research plan. FY 1987-FY 1991. Volume 3

    International Nuclear Information System (INIS)

    1986-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  12. Long-Range Research Plan, FY 1986-FY 1990. Volume 2

    International Nuclear Information System (INIS)

    1985-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  13. Information resources management long-range plan, FY1994--1998

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  14. Information resources management long-range plan, FY1994--1998

    International Nuclear Information System (INIS)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  15. INEL D ampersand D Long-Range Plan

    International Nuclear Information System (INIS)

    Buckland, R.J.; Kenoyer, D.J.; Preussner, D.H.

    1993-10-01

    This Long-Range Plan presents the Decontamination and Decommissioning (D ampersand D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D ampersand D Program objectives, management criteria, and philosophy; discusses current activities; and documents the INEL D ampersand D Program cost and schedule estimate projections for the next 15 years. appendices are included that provide INEL D ampersand D project historical information and a comprehensive descriptive summary of each current surplus facility

  16. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  17. INEL D ampersand D long-range plan

    International Nuclear Information System (INIS)

    Buckland, R.J.; Kenoyer, D.J.; LaBuy, S.A.

    1995-09-01

    This Long-Range Plan presents the Decontamination and Dismantlement (D ampersand D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D ampersand D Program objectives, management criteria, and policy; discusses current activities; and documents the INEL D ampersand D Program cost and schedule estimate projections for the next 15 years. Appendices are included that provide INEL D ampersand D project historical information, a comprehensive descriptive summary of each current D ampersand D surplus facility, and a summary database of all INEL contaminated facilities awaiting or undergoing the facility transition process

  18. Long range planning of radiotherapy facilities in the Netherlands

    NARCIS (Netherlands)

    Postma, T.J.B.M.; Terpstra, S.

    2000-01-01

    The subject of this paper is long range planning or policy development for healthcare in the Netherlands. Especially the co-ordinating function of planning will be discussed. In healthcare different actors or stakeholders are involved. Each of these actors may have their own interests, expectations,

  19. Strategic Long Range Planning for Universities. AIR Forum 1980 Paper.

    Science.gov (United States)

    Baker, Michael E.

    The use of strategic long-range planning at Carnegie-Mellon University (CMU) is discussed. A structure for strategic planning analysis that integrates existing techniques is presented, and examples of planning activities at CMU are included. The key concept in strategic planning is competitive advantage: if a university has a competitive…

  20. DIII-D tokamak long range plan. Revision 3

    International Nuclear Information System (INIS)

    1992-08-01

    The DIII-D Tokamak Long Range Plan for controlled thermonuclear magnetic fusion research will be carried out with broad national and international participation. The plan covers: (1) operation of the DIII-D tokamak to conduct research experiments to address needs of the US Magnetic Fusion Program; (2) facility modifications to allow these new experiments to be conducted; and (3) collaborations with other laboratories to integrate DIII-D research into the national and international fusion programs. The period covered by this plan is 1 November 19983 through 31 October 1998

  1. What moves you Arizona : long-range transportation plan : 2010-2035.

    Science.gov (United States)

    2011-11-01

    "What Moves You Arizona is the Arizona Department of Transportations (ADOT) Long-Range Transportation Plan (LRTP). The LRTP, or Plan, defines visionary, yet pragmatic, investment choices Arizona will make over the next 25 years to maintain a...

  2. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Science.gov (United States)

    2010-04-01

    ... Program Facilities Long-Range Transportation Planning § 170.410 What is the purpose of tribal long-range... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of tribal long-range transportation planning? 170.410 Section 170.410 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND...

  3. Long-Range Planning Can Improve the Efficiency of Agricultural Research and Development.

    Science.gov (United States)

    1981-07-24

    planning is not done » Conclusions Recommendat ion Agency comments ADVISORY BODIES HAVE HAD MIXED SUCCESS IN AFFECTING LONG-RANGE PLANNING... kfc r Their efforts have more impact on determining priorities for the short-range budgeting cycle rather than influencing development of long...cultural products, (2) developing an efficient marketing and processing system, (3) conserving natural resources, and (4) im- proving the well-being of

  4. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  5. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  6. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  7. 25 CFR 170.413 - What is the public role in developing the long-range transportation plan?

    Science.gov (United States)

    2010-04-01

    ... Roads Program Facilities Long-Range Transportation Planning § 170.413 What is the public role in developing the long-range transportation plan? BIA or the tribe must solicit public involvement. If there are... newspapers when the draft long-range transportation plan is complete. In the absence of local public...

  8. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  9. 25 CFR 170.412 - How is the tribal IRR long-range transportation plan developed and approved?

    Science.gov (United States)

    2010-04-01

    ...-range transportation plan developed and approved? (a) The tribal IRR long-range transportation plan is... 25 Indians 1 2010-04-01 2010-04-01 false How is the tribal IRR long-range transportation plan developed and approved? 170.412 Section 170.412 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  10. Library Services and Construction Act. Long Range Plan, 1982-1986 Updates.

    Science.gov (United States)

    Seidenberg, Edward

    This 1982-86 update to long-range planning designed to continue the improvement of library facilities and services in Texas includes a review of how the plan developed, the various environmental factors affecting library operations, the present development of libraries, information needs and approaches to satisfying those needs, and methods for…

  11. Enhancing Transportation Equity Analysis for Long Range Planning and Decision Making

    OpenAIRE

    Bills, Tierra Suzan

    2013-01-01

    Metropolitan Planning Organizations (MPOs) regularly perform equity analyses for their long-range transportation plans, as this is required by Environmental Justice regulations. These regional-level plans may propose hundreds of transportation infrastructure and policy changes (e.g. highway and transit extensions, fare changes, pricing schemes, etc.) as well as land-use policy changes. The challenge is to assess the distribution of impacts from all the proposed changes across different popula...

  12. 25 CFR 170.411 - What may a long-range transportation plan include?

    Science.gov (United States)

    2010-04-01

    ...) Social and economic development planning to identify transportation improvements or needs to accommodate... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN...

  13. Context and meter enhance long-range planning in music performance

    Directory of Open Access Journals (Sweden)

    Brian eMathias

    2015-01-01

    Full Text Available Neural responses demonstrate evidence of resonance, or oscillation, during the production of periodic auditory events. Music contains periodic auditory events that give rise to a sense of beat, which in turn generates a sense of meter on the basis of multiple periodicities. Metrical hierarchies may aid memory for music by facilitating similarity-based associations among sequence events at different periodic distances that unfold in longer contexts. A fundamental question is how metrical associations arising from a musical context influence memory during music performance. Longer contexts may facilitate metrical associations at higher hierarchical levels more than shorter contexts, a prediction of the range model, a formal model of planning processes in music performance (Palmer and Pfordresher, 2003; Pfordresher et al., 2007. Serial ordering errors, in which intended sequence events are produced in incorrect sequence positions, were measured as skilled pianists performed musical pieces that contained excerpts embedded in long or short musical contexts. Pitch errors arose from metrically similar positions and further sequential distances more often when the excerpt was embedded in long contexts compared to short contexts. Musicians’ keystroke intensities and error rates also revealed influences of metrical hierarchies, which differed for performances in long and short contexts. The range model accounted for contextual effects and provided better fits to empirical findings when metrical associations between sequence events were included. Longer sequence contexts may facilitate planning during sequence production by increasing conceptual similarity between hierarchically associated events. These findings are consistent with the notion that neural oscillations at multiple periodicities may strengthen metrical associations across sequence events during planning.

  14. Integration of long-range planning for management of defense transuranic waste

    International Nuclear Information System (INIS)

    Gilbert, K.V.; McFadden, M.H.; Raudenbush, M.H.; Smith, L.J.

    1984-01-01

    As described in The Defense Waste Management Plan, the defense TRU program goal is to achieve permanent disposal and to end interim storage. TRU waste is currently stored at six Department of Energy (DOE) sites, and new waste is generated at several more sites. The Waste Isolation Pilot Plant (WIPP) project is well defined, and it has been necessary to integrate the activities of other parts of the TRU program in support of DOE Headquarters policy and the WIPP schedules and technical requirements. The strategy is described in the Defense Transuranic Waste Program Strategy Document. More detailed, quantitative plans have been developed through the use of several system models, with a Long-Range Master Plan for Defense Transuranic Waste Management as the focal point for coordination of proposed plans with all the parties involved

  15. Prospects for bioenergy use in Ghana using Long-range Energy Alternatives Planning model

    DEFF Research Database (Denmark)

    Kemausuor, Francis; Nygaard, Ivan; Mackenzie, Gordon A.

    2015-01-01

    biomass sources, through the production of biogas, liquid biofuels and electricity. Analysis was based on moderate and high use of bioenergy for transportation, electricity generation and residential fuel using the LEAP (Long-range Energy Alternatives Planning) model. Results obtained indicate...

  16. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  17. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  18. Opportunities in Nuclear Science: A Long-Range Plan for the Next Decade

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-04-01

    The DOE/NSF Nuclear Science Advisory Committee of the Department of Energy and the National Science Foundation is charged with providing advice on a continuing basis regarding the management of the national basic nuclear science research program. In July 2000, the Committee was asked to study the opportunities and priorities for U.S. nuclear physics research, and to develop a long-range plan that will serve as a frame-work for the coordinated advancement of the field for the next decade. The plan contained here is the fifth that has been pre-pared since the Committee was established. Each of the earlier plans has had substantial impact on new directions and initiatives in the field.

  19. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  20. Long-range planning cost model for support of future space missions by the deep space network

    Science.gov (United States)

    Sherif, J. S.; Remer, D. S.; Buchanan, H. R.

    1990-01-01

    A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.

  1. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  2. The Frontiers of Nuclear Science: A Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-01

    In a letter dated July 17, 2006, the Department of Energy’s (DOE) Office of Science for Nuclear Physics and the National Science Foundation’s (NSF) Mathematical and Physical Sciences Directorate charged the Nuclear Science Advisory Committee (NSAC) to “conduct a study of the opportunities and priorities for U.S. nuclear physics research and recommend a long range plan that will provide a framework for coordinated advancement of the nation’s nuclear science research programs over the next decade.” This request set in motion a bottom-up review and forward look by the nuclear science community. With input from this community-wide process, a 59 member working group, which included the present NSAC members, gathered at the beginning of May, 2007, to develop guidance on how to optimize the future research directions for the field based on the projected resources outlined in the charge letter from DOE and NSF. A new long range plan—The Frontiers of Nuclear Science—grew out of this meeting. For the last decade, the top priority for nuclear science has been to utilize the flagship facilities that were built with investments by the nation in the 1980s and 1990s. Research with these facilities has led to many significant new discoveries that have changed our understanding of the world in which we live. But new discoveries demand new facilities, and the successes cannot continue indefinitely without new investment.

  3. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  4. RANGE RAM: a long-term planning method for managing grazing lands

    Science.gov (United States)

    Henricus C. Jansen

    1976-01-01

    Range RAM (Resource Allocation Method) is a computerized planning method designed to assist range managers in developing and selecting alternatives in spatial and temporal allocation of resources. The technique is applicable at the frest or district management levels, or their equivalents. Range RAM can help formulate plans that maximize the production of range outputs...

  5. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  6. Critical human-factors issues in nuclear-power regulation and a recommended comprehensive human-factors long-range plan. Executive summary

    International Nuclear Information System (INIS)

    Hopkins, C.O.; Snyder, H.L.; Price, H.E.; Hornick, R.J.; Mackie, R.R.; Smillie, R.J.; Sugarman, R.C.

    1982-08-01

    This comprehensive long-range human factors plan for nuclear reactor regulation was developed by a Study Group of the Human Factors Society, Inc. This Study Group was selected by the Executive Council of the Society to provide a balanced, experienced human factors perspective to the applications of human factors scientific and engineering knowledge to nuclear power generation. The report is presented in three volumes. Volume 1 contains an Executive Summary of the 18-month effort and its conclusions. Volume 2 summarizes all known nuclear-related human factors activities, evaluates these activities wherever adequate information is available, and describes the recommended long-range (10-year) plan for human factors in regulation. Volume 3 elaborates upon each of the human factors issues and areas of recommended human factors involvement contained in the plan, and discusses the logic that led to the recommendations

  7. Long Range Aircraft Trajectory Prediction

    OpenAIRE

    Magister, Tone

    2009-01-01

    The subject of the paper is the improvement of the aircraft future trajectory prediction accuracy for long-range airborne separation assurance. The strategic planning of safe aircraft flights and effective conflict avoidance tactics demand timely and accurate conflict detection based upon future four–dimensional airborne traffic situation prediction which is as accurate as each aircraft flight trajectory prediction. The improved kinematics model of aircraft relative flight considering flight ...

  8. Study of the proper contribution of independent power producing business in the long-range power supply and demand plan

    Energy Technology Data Exchange (ETDEWEB)

    Jo, S.B. [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1997-12-01

    The independent power producing business has expanded its size and process through the Long-range Power Supply and Demand Plan of 1993, 1995, and it is high time that full-scale competition in the power generation market began to emerge. This report assesses the marginal costs of independent and general power producing businesses on a theoretical basis on the proper size of independent power producing business, and presents the methods to compare these. But, since there follows several problems in applying this theoretical model, a practical standard to decide the proper level of independent power production amount is presented. That is, while not much burdening the existing industrial structure, I search for ways to present the amount of independent power production and the methods of power generation to make sure that the competition effect is maximized when full-scale competition started. However, in the long-term, the allotment of independent power production itself could be a violation to the basic spirit of competition. A more desirable way is to allow independent power producers and the Korea Power Corp. to freely compete on all types of power generation and facilities. The supply plan should be also operated smoothly and flexibly since the types of power generation and the amounts reflect the result of competition not the predetermined ones. Therefore, a long-range power supply and demand plan should be converted from a planning-oriented concept to a market-oriented base with the structural overhaul of the power generation industry for the effective resources distribution of power supply facilities. 18 refs., 2 figs., 7 tabs.

  9. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    Science.gov (United States)

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  10. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Science.gov (United States)

    2013-10-03

    ...-0030] RIN 2132-AB20; 2132-AB07 The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... Public Transportation Safety Program (National Safety Program) and the requirements of the new transit...

  11. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  12. Long-term storage of radioactive waste: IAEA perspectives on safety and sustainability

    International Nuclear Information System (INIS)

    Rowat, J.H.; Louvat, D.; Metcalf, P.E.

    2006-01-01

    As the amounts of radioactive waste in surface storage have increased, concern has grown over the safety and sustainability of storage in the long term. In response to increasing concerns, the International Atomic Energy Agency (IAEA) has included an action to address the safety implications of the long-term storage (LTS) of radioactive waste in its action plan for waste safety; the action plan was endorsed by the IAEA's Member States in 2001. In 2003, the IAEA published a position paper on the safety and sustainability of LTS as part fulfilment of the action in question. A key theme of the position paper is the contrast of safety and sustainability implications of LTS with those of disposal. The present paper provides a summary of the position paper, describes current IAEA activities that deal with the subject of LTS, and discusses findings from the 2004 Cordoba symposium on disposal of low activity radioactive waste that pertain to LTS. (author)

  13. NUMO's approach for long-term safety assessment - 59404

    International Nuclear Information System (INIS)

    Ebashi, Takeshi; Kaku, Kenichi; Ishiguro, Katsuhiko

    2012-01-01

    One of NUMO's policies for ensuring safety is staged and flexible project implementation and decision-making based on iterative confirmation of safety. The safety assessment takes the central role in multiple lines of reasoning and argumentation by providing a quantitative evaluation of long-term safety; a key aspect is uncertainty management. This paper presents NUMO's basic strategies for long-term safety assessment based on the above policy. NUMO's approach considering Japanese boundary conditions is demonstrated as a starting-point for evaluating the long-term safety of an actual site. In Japan, the Act on Final Disposal of Specified Radioactive Waste states that the siting process shall consist of three stages. The Nuclear Waste Management Organization of Japan (NUMO) is responsible for geological disposal of vitrified high-level waste and some types of TRU waste. NUMO has chosen to implement a volunteer approach to siting. NUMO decided to prepare the so-called 2010 technical report, which sets out three safety policies, one of which is staged project implementation and decision-making based on iterative confirmation of safety. Based on this policy, NUMO will gradually integrate relevant interdisciplinary knowledge to build a safety case when a formal volunteer application is received that would allow site investigations to be initiated. The safety assessment takes the central role in multiple lines of reasoning and argumentation by providing a quantitative evaluation of long-term safety; one of a key aspect is uncertainty management. This paper presents the basic strategies for NUMO's long-term safety assessment based on the above policy. In concrete terms, the common procedures involved in safety assessment are applied in a stepwise manner, based on integration of knowledge obtained from site investigations/evaluations and engineered measures. The results of the safety assessment are then reflected in the planning of site investigations and engineered

  14. 29 CFR 1915.502 - Fire safety plan.

    Science.gov (United States)

    2010-07-01

    ... implement a written fire safety plan that covers all the actions that employers and employees must take to ensure employee safety in the event of a fire. (See Appendix A to this subpart for a Model Fire Safety... safety plan for their employees, and this plan must comply with the host employer's fire safety plan. ...

  15. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-28

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  16. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  17. 2011 NASA Range Safety Annual Report

    Science.gov (United States)

    Dumont, Alan G.

    2012-01-01

    Welcome to the 2011 edition of the NASA Range Safety Annual Report. Funded by NASA Headquarters, this report provides a NASA Range Safety overview for current and potential range users. As is typical with odd year editions, this is an abbreviated Range Safety Annual Report providing updates and links to full articles from the previous year's report. It also provides more complete articles covering new subject areas, summaries of various NASA Range Safety Program activities conducted during the past year, and information on several projects that may have a profound impact on the way business will be done in the future. Specific topics discussed and updated in the 2011 NASA Range Safety Annual Report include a program overview and 2011 highlights; Range Safety Training; Range Safety Policy revision; Independent Assessments; Support to Program Operations at all ranges conducting NASA launch/flight operations; a continuing overview of emerging range safety-related technologies; and status reports from all of the NASA Centers that have Range Safety responsibilities. Every effort has been made to include the most current information available. We recommend this report be used only for guidance and that the validity and accuracy of all articles be verified for updates. Once again the web-based format was used to present the annual report. We continually receive positive feedback on the web-based edition and hope you enjoy this year's product as well. As is the case each year, contributors to this report are too numerous to mention, but we thank individuals from the NASA Centers, the Department of Defense, and civilian organizations for their contributions. In conclusion, it has been a busy and productive year. I'd like to extend a personal Thank You to everyone who contributed to make this year a successful one, and I look forward to working with all of you in the upcoming year.

  18. The long range DIII-D plan

    International Nuclear Information System (INIS)

    Simonen, T.C.

    1993-02-01

    The mission of the DIII-D tokamak research program is to provide data needed by ITER and to develop a conceptual physics blueprint for a commercially attractive electrical demonstration plant (DEMO) that would open a path to fusion power commercialization. The National Energy Strategy calls for the development of magnetic fusion as an energy option with operation of a DEMO by 2025. The DEMO will be based on nuclear technology demonstrated in ITER and the physics and engineering database established in magnetic fusion facilities during the next two decades. On the present path, based on extrapolation of current conventional operating modes, ITER is twice as large as Joint European Tokamak (JET), and DEMO, using the same logic, will be even larger. However, successful development of advanced tokamak operating modes could open the way for significantly improved confinement and stability, leading to a smaller, more commercially attractive DEMO, provided new diverter concepts are developed to handle the accompanying high divertor power density. A smaller and lower cost DEMO opens up the possibility that multiple nations, utilities, and industries could build DEMOs simultaneously and, therefore, more rapidly optimize the tokamak for commercialization. Results from experiments at DIII-D and other tokamaks indicate that plasma and divertor performance can be increased transiently beyond the baseline conceptual design of ITER. A simultaneous long pulse demonstration of such improved tokamak plasma and divertor operation for steady state would establish an advanced physics foundation for the tokamak physics experiment program, provide new operating options for ITER, and open a path to an attractive DEMO. The planned DIII-D program incorporates new theory and technology developments to extend the tokamak experimental physics database toward steady state. This research program will also continue to provide increased understanding in many areas of fusion science and technology

  19. Reducing the sensitivity of IMPT treatment plans to setup errors and range uncertainties via probabilistic treatment planning

    International Nuclear Information System (INIS)

    Unkelbach, Jan; Bortfeld, Thomas; Martin, Benjamin C.; Soukup, Martin

    2009-01-01

    Treatment plans optimized for intensity modulated proton therapy (IMPT) may be very sensitive to setup errors and range uncertainties. If these errors are not accounted for during treatment planning, the dose distribution realized in the patient may by strongly degraded compared to the planned dose distribution. The authors implemented the probabilistic approach to incorporate uncertainties directly into the optimization of an intensity modulated treatment plan. Following this approach, the dose distribution depends on a set of random variables which parameterize the uncertainty, as does the objective function used to optimize the treatment plan. The authors optimize the expected value of the objective function. They investigate IMPT treatment planning regarding range uncertainties and setup errors. They demonstrate that incorporating these uncertainties into the optimization yields qualitatively different treatment plans compared to conventional plans which do not account for uncertainty. The sensitivity of an IMPT plan depends on the dose contributions of individual beam directions. Roughly speaking, steep dose gradients in beam direction make treatment plans sensitive to range errors. Steep lateral dose gradients make plans sensitive to setup errors. More robust treatment plans are obtained by redistributing dose among different beam directions. This can be achieved by the probabilistic approach. In contrast, the safety margin approach as widely applied in photon therapy fails in IMPT and is neither suitable for handling range variations nor setup errors.

  20. ORNL Long-Range Environmental and Waste Management Plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1987-12-01

    The primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirments. The document also provides an estimate of the resources required to implenent the current plan. As with any document of this nature, the near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and relects the efforts preceived to be necesary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. 15 figs., 10 tabs

  1. Long-range dependence in returns and volatility of Central European Stock Indices

    Czech Academy of Sciences Publication Activity Database

    Krištoufek, Ladislav

    2010-01-01

    Roč. 2010, č. 3 (2010), s. 1-19 R&D Projects: GA ČR GD402/09/H045 Institutional research plan: CEZ:AV0Z10750506 Keywords : long-range dependence * rescaled range * modified rescaled range * bootstrapping Subject RIV: AH - Economics http://library.utia.cas.cz/separaty/2010/E/kristoufek-long-range dependence in returns and volatility of central european stock indices.pdf

  2. USNRC HTGR safety research program overview

    International Nuclear Information System (INIS)

    Foulds, R.B.

    1982-01-01

    An overview is given of current activities and planned research efforts of the US Nuclear Regulatory Commission (NRC) HTGR Safety Program. On-going research at Brookhaven National Laboratory, Oak Ridge National Laboratory, Los Alamos National Laboratory, and Pacific Northwest Laboratory are outlined. Tables include: HTGR Safety Issues, Program Tasks, HTGR Computer Code Library, and Milestones for Long Range Research Plan

  3. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  4. Political Mechanisms for Long-Range Survival and Development

    Science.gov (United States)

    Marshall, W.

    As the first species aware of extinction and capable of proactively ensuring our long-term survival and development, it is striking that we do not do so with the rigor, formality, and foresight it requires. Only from a reactive posture have we responded to the challenges of global warfare, human rights, environmental concerns, and sustainable development. Despite our awareness of the possibility for extinction and apocalyptic set-backs to our evolution, and despite the existence of long-range studies-which must still be dramatically increased-proactive global policy implementation regarding our long-term survival and development is arguably non-existent. This lack of long-term policy making can be attributed in part to the lack of formal political mechanisms to facilitate longer-range policy making that extends 30 years or more into the future. Political mechanisms for infusing long-range thinking, research, and strategic planning into the policy-making process can help correct this shortcoming and provide the motivation needed to adequately address long-term challenges with the political rigor required to effectively establish and implement long-term policies. There are some efforts that attempt to address longer-range issues, but those efforts often do not connect to the political process, do not extend 30 or more years into the future, are not well-funded, and are not sufficiently systemic. Political mechanisms for long-range survival and prosperity could correct these inadequacies by raising awareness, providing funding, and most importantly, leveraging political rigor to establish and enforce long-range strategic planning and policies. The feasibility of such mechanisms should first be rigorously studied and assessed in a feasibility study, which could then inform implementation. This paper will present the case for such a study and suggest some possible political mechanisms that should be investigated further in the proposed study. This work is being further

  5. Emergency planning and long-term care: least paid, least powerful, most responsible.

    Science.gov (United States)

    Covan, Eleanor Krassen; Fugate-Whitlock, Elizabeth

    2010-11-01

    As disasters can occur anywhere, planning to avoid emergencies is an international concern. Our research specifically addresses planning for the needs and safety of a vulnerable population, long-term care residents. Our initial purposes in this evaluation research were to assess the utility of a template to gather emergency management information for individual long-term care communities, to report on how prepared they are to cope with emergencies that have occurred elsewhere in areas like ours, and to assess the effectiveness of employing gerontology students in the planning process. As we began analyzing our data, we realized that it is imperative to consider whether it is possible for long-term care communities to respond effectively to disasters. In our findings we focus on the impact of gender in the planning process, the importance of size with regard to template utility, the positive and negative consequences of student aid, and the fact that gathering plans for individual long-term care communities may have detracted from collaborative community planning.

  6. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    International Nuclear Information System (INIS)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-01-01

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  7. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-05-14

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  8. Critical human-factors issues in nuclear-power regulation and a recommended comprehensive human-factors long-range plan. Critical discussion of human factors areas of concern

    International Nuclear Information System (INIS)

    Hopkins, C.O.; Snyder, H.L.; Price, H.E.; Hornick, R.J.; Mackie, R.R.; Smillie, R.J.; Sugarman, R.C.

    1982-08-01

    This comprehensive long-range human factors plan for nuclear reactor regulation was developed by a Study Group of the Human Factors Society, Inc. This Study Group was selected by the Executive Council of the Society to provide a balanced, experienced human factors perspective to the applications of human factors scientific and engineering knowledge to nuclear power generation. The report is presented in three volumes. Volume 1 contains an Executive Summary of the 18-month effort and its conclusions. Volume 2 summarizes all known nuclear-related human factors activities, evaluates these activities wherever adequate information is available, and describes the recommended long-range (10-year) plan for human factors in regulation. Volume 3 elaborates upon each of the human factors issues and areas of recommended human factors involvement contained in the plan, and discusses the logic that led to the recommendations

  9. Autonomous system for launch vehicle range safety

    Science.gov (United States)

    Ferrell, Bob; Haley, Sam

    2001-02-01

    The Autonomous Flight Safety System (AFSS) is a launch vehicle subsystem whose ultimate goal is an autonomous capability to assure range safety (people and valuable resources), flight personnel safety, flight assets safety (recovery of valuable vehicles and cargo), and global coverage with a dramatic simplification of range infrastructure. The AFSS is capable of determining current vehicle position and predicting the impact point with respect to flight restriction zones. Additionally, it is able to discern whether or not the launch vehicle is an immediate threat to public safety, and initiate the appropriate range safety response. These features provide for a dramatic cost reduction in range operations and improved reliability of mission success. .

  10. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  11. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  12. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  13. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  14. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  15. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  16. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  17. Safety analysis SFR 1. Long-term safety

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-15

    An updated assessment of the long-term safety of SKB's final repository for radioactive operational waste, SFR 1, is presented in this report. The report is included in the safety analysis report for SFR 1. The most recent account of long-term safety was submitted to the regulatory authorities in 2001. The present report has been compiled on SKB's initiative to address the regulatory authorities' viewpoints regarding the preceding account of long-term safety. Besides the new mode of working with safety functions there is another important difference between the 2001 safety assessment and the current assessment: The time horizon in the current assessment has been extended to 100,000 years in order to include the effect of future climate changes. The purpose of this renewed assessment of the long-term safety of SFR 1 is to show with improved data that the repository is capable of protecting human health and the environment against ionizing radiation in a long-term perspective. This is done by showing that calculated risks lie below the risk criteria stipulated by the regulatory authorities. SFR 1 is built to receive, and after closure serve as a passive repository for, low. and intermediate-level radioactive waste. The disposal chambers are situated in rock beneath the sea floor, covered by about 60 metres of rock. The underground part of the facility is reached via two tunnels whose entrances are near the harbour. The repository has been designed so that it can be abandoned after closure without further measures needing to be taken to maintain its function. The waste in SFR 1 is short-lived low- and intermediate-level waste. After 100 years the activity is less than half, and after 1,000 years only about 2% of the original activity remains. The report on long-term safety comprises eleven chapters. Chapter 1 Introduction. The chapter describes the purpose, background, format and contents of SAR-08, applicable regulations and injunctions, and the regulatory

  18. Safety analysis SFR 1. Long-term safety

    International Nuclear Information System (INIS)

    2008-12-01

    An updated assessment of the long-term safety of SKB's final repository for radioactive operational waste, SFR 1, is presented in this report. The report is included in the safety analysis report for SFR 1. The most recent account of long-term safety was submitted to the regulatory authorities in 2001. The present report has been compiled on SKB's initiative to address the regulatory authorities' viewpoints regarding the preceding account of long-term safety. Besides the new mode of working with safety functions there is another important difference between the 2001 safety assessment and the current assessment: The time horizon in the current assessment has been extended to 100,000 years in order to include the effect of future climate changes. The purpose of this renewed assessment of the long-term safety of SFR 1 is to show with improved data that the repository is capable of protecting human health and the environment against ionizing radiation in a long-term perspective. This is done by showing that calculated risks lie below the risk criteria stipulated by the regulatory authorities. SFR 1 is built to receive, and after closure serve as a passive repository for, low. and intermediate-level radioactive waste. The disposal chambers are situated in rock beneath the sea floor, covered by about 60 metres of rock. The underground part of the facility is reached via two tunnels whose entrances are near the harbour. The repository has been designed so that it can be abandoned after closure without further measures needing to be taken to maintain its function. The waste in SFR 1 is short-lived low- and intermediate-level waste. After 100 years the activity is less than half, and after 1,000 years only about 2% of the original activity remains. The report on long-term safety comprises eleven chapters. Chapter 1 Introduction. The chapter describes the purpose, background, format and contents of SAR-08, applicable regulations and injunctions, and the regulatory

  19. Safety analysis SFR 1. Long-term safety

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-15

    An updated assessment of the long-term safety of SKB's final repository for radioactive operational waste, SFR 1, is presented in this report. The report is included in the safety analysis report for SFR 1. The most recent account of long-term safety was submitted to the regulatory authorities in 2001. The present report has been compiled on SKB's initiative to address the regulatory authorities' viewpoints regarding the preceding account of long-term safety. Besides the new mode of working with safety functions there is another important difference between the 2001 safety assessment and the current assessment: The time horizon in the current assessment has been extended to 100,000 years in order to include the effect of future climate changes. The purpose of this renewed assessment of the long-term safety of SFR 1 is to show with improved data that the repository is capable of protecting human health and the environment against ionizing radiation in a long-term perspective. This is done by showing that calculated risks lie below the risk criteria stipulated by the regulatory authorities. SFR 1 is built to receive, and after closure serve as a passive repository for, low. and intermediate-level radioactive waste. The disposal chambers are situated in rock beneath the sea floor, covered by about 60 metres of rock. The underground part of the facility is reached via two tunnels whose entrances are near the harbour. The repository has been designed so that it can be abandoned after closure without further measures needing to be taken to maintain its function. The waste in SFR 1 is short-lived low- and intermediate-level waste. After 100 years the activity is less than half, and after 1,000 years only about 2% of the original activity remains. The report on long-term safety comprises eleven chapters. Chapter 1 Introduction. The chapter describes the purpose, background, format and contents of SAR-08, applicable regulations and injunctions, and the

  20. ORNL long-range environmental and waste management plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs

  1. Chemical Hygiene and Safety Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  2. Range Flight Safety Requirements

    Science.gov (United States)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  3. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  4. Disposal of radioactive waste: can long-term safety be evaluated

    International Nuclear Information System (INIS)

    1991-01-01

    The long-term safety of any hazardous waste disposal system must be convincingly shown prior to its implementation. For radioactive wastes, safety assessments over timescales far beyond the normal horizon of social and technical planning have already been conducted in many countries. These assessments provide the principal means to investigate, quantify, and explain long-term safety of each selected disposal concept and site for the appropriate authorities and the public. Such assessments are based on four main elements: definition of the disposal system and its environment, identification of possible processes and events that may affect the integrity of the disposal system, quantification of the radiological impact by predictive modelling, and description of associated uncertainties. The NEA Radioactive Waste Management Committee and the IAEA International Radioactive Waste Management Advisory Committee have carefully examined the current scientific methods for safety assessments of radioactive waste disposal systems, as briefly summarized in this report. The Committees have also reviewed the experience now available from using safety assessment methods in many countries, for different disposal concepts and formations, and in the framework of both nationally and internationally conducted studies, as referenced in this report [fr

  5. Long-range dependence in returns and volatility of Central European Stock Indices

    Czech Academy of Sciences Publication Activity Database

    Krištoufek, Ladislav

    2010-01-01

    Roč. 17, č. 27 (2010), s. 50-67 ISSN 1212-074X R&D Projects: GA ČR GD402/09/H045; GA ČR GA402/09/0965 Grant - others:GA UK(CZ) 5183/2010 Institutional research plan: CEZ:AV0Z10750506 Keywords : long-range dependence * bootstrapping * rescaled range analysis * rescaled variance analysis Subject RIV: AH - Economics http://library.utia.cas.cz/separaty/2010/E/kristoufek-long-range dependence in returns and volatility of central european stock indices bces.pdf

  6. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  7. Transuranic waste: long-term planning

    International Nuclear Information System (INIS)

    Young, K.C.

    1985-07-01

    Societal concerns for the safe handling and disposal of toxic waste are behind many of the regulations and the control measures in effect today. Transuranic waste, a specific category of toxic (radioactive) waste, serves as a good example of how regulations and controls impact changes in waste processing - and vice versa. As problems would arise with waste processing, changes would be instituted. These changes improved techniques for handling and disposal of transuranic waste, reduced the risk of breached containment, and were usually linked with regulatory changes. Today, however, we face a greater public awareness of and concern for toxic waste control; thus, we must anticipate potential problems and work on resolving them before they can become real problems. System safety analyses are valuable aids in long-term planning for operations involving transuranic as well as other toxic materials. Examples of specific system safety analytical methods demonstrate how problems can be anticipated and resolution initiated in a timely manner having minimal impacts upon allocation of resource and operational goals. 7 refs., 1 fig

  8. Global transportation cost modeling for long range planning

    International Nuclear Information System (INIS)

    Pope, R.B.; Michelhaugh, R.D.; Singley, P.T.; Lester, P.B.

    1998-01-01

    The U.S. Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost-estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to significant number of shipping campaigns of radioactive waste. This cost-estimating model, known as the TEn-year Plan TRAnsportation cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for recovering and processing of the wastes, packaging the wastes for transport, and the carriage of the waste. It also provides a rough order-of-magnitude estimate of labor costs associated with preparing nd undertaking the shipments. At the user's direction, the model can also consider the cost of DOE's interactions with its external stakeholders (e.g., state and local governments and tribal entities) and the cost associated with tracking and communicating with the shipments. By considering all of these sources of costs, it provides a mechanism for assessing and comparing the costs of various waste processing and shipping campaign alternatives to help guide decision-making. Recent analyses of specific planned shipments of transuranic (TRU) waste which consider alternative packaging options are described. These analyses show that options are available for significantly reducing total costs while still satisfying regulatory requirements. (authors)

  9. Advanced Range Safety System for High Energy Vehicles

    Science.gov (United States)

    Claxton, Jeffrey S.; Linton, Donald F.

    2002-01-01

    The advanced range safety system project is a collaboration between the National Aeronautics and Space Administration and the United States Air Force to develop systems that would reduce costs and schedule for safety approval for new classes of unmanned high-energy vehicles. The mission-planning feature for this system would yield flight profiles that satisfy the mission requirements for the user while providing an increased quality of risk assessment, enhancing public safety. By improving the speed and accuracy of predicting risks to the public, mission planners would be able to expand flight envelopes significantly. Once in place, this system is expected to offer the flexibility of handling real-time risk management for the high-energy capabilities of hypersonic vehicles including autonomous return-from-orbit vehicles and extended flight profiles over land. Users of this system would include mission planners of Space Launch Initiative vehicles, space planes, and other high-energy vehicles. The real-time features of the system could make extended flight of a malfunctioning vehicle possible, in lieu of an immediate terminate decision. With this improved capability, the user would have more time for anomaly resolution and potential recovery of a malfunctioning vehicle.

  10. Global transportation cost modeling for long-range planning

    International Nuclear Information System (INIS)

    Pope, R.B.; Michelhaugh, R.D.; Singley, P.T.; Lester, P.B.

    1998-02-01

    The US Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to a significant number of shipping campaigns of radioactive waste. This cost estimating model, known as the Ten-year Plan Transportation Cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for (a) recovering and processing of the wastes, (b)packaging the wastes for transport, and (c) the carriage of the waste. It also provides a rough order of magnitude estimate of labor costs associated with preparing and undertaking the shipments. At the user's direction, the model can also consider the cost of DOE's interactions with its external stakeholders (e.g., state and local governments and tribal entities) and the cost associated with tracking and communicating with the shipments. By considering all of these sources of costs, it provides a mechanism for assessing and comparing the costs of various waste processing and shipping campaign alternatives to help guide decision-making. Recent analyses of specific planned shipments of transuranic (TRU) waste which consider alternative packaging options are described. These analyses show that options are available for significantly reducing total costs while still satisfying regulatory requirements

  11. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  12. Long-Range WindScanner System

    DEFF Research Database (Denmark)

    Vasiljevic, Nikola; Lea, Guillaume; Courtney, Michael

    2016-01-01

    The technical aspects of a multi-Doppler LiDAR instrument, the long-range WindScanner system, are presented accompanied by an overview of the results from several field campaigns. The long-range WindScanner system consists of three spatially-separated, scanning coherent Doppler LiDARs and a remote......-rangeWindScanner system measures the wind field by emitting and directing three laser beams to intersect, and then scanning the beam intersection over a region of interest. The long-range WindScanner system was developed to tackle the need for high-quality observations of wind fields on scales of modern wind turbine...

  13. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  14. The long-term forecast of Pakistan's electricity supply and demand: An application of long range energy alternatives planning

    International Nuclear Information System (INIS)

    Perwez, Usama; Sohail, Ahmed; Hassan, Syed Fahad; Zia, Usman

    2015-01-01

    The long-term forecasting of electricity demand and supply has assumed significant importance in fundamental research to provide sustainable solutions to the electricity issues. In this article, we provide an overview of structure of electric power sector of Pakistan and a summary of historical electricity demand & supply data, current status of divergent set of energy policies as a framework for development and application of a LEAP (Long-range Energy Alternate Planning) model of Pakistan's electric power sector. Pakistan's LEAP model is used to analyze the supply policy selections and demand assumptions for future power generation system on the basis of economics, technicality and implicit environmental implications. Three scenarios are enacted over the study period (2011–2030) which include BAU (Business-As-Usual), NC (New Coal) & GF (Green Future). The results of these scenarios are compared in terms of projected electricity demand & supply, net present cost analysis (discount rate at 4%, 7% and 10%) and GHG (greenhouse gas) emission reductions, along with sensitivity analysis to study the effect of varying parameters on total cost. A concluding section illustrates the policy implications of model for futuristic power generation and environmental policies in Pakistan. - Highlights: • Pakistan-specific electricity demand model is presented. • None of the scenarios exceeded the price of 12 US Cents/kWh. • By 2030, fuel cost is the most dominant factor to influence electricity per unit cost. • By 2030, CO_2 emissions per unit electricity will increase significantly in coal scenario relative to others. • By 2030, the penetration of renewable energy and conservation policies can save 70.6 tWh electricity.

  15. Long-Term Safety Analysis of Baldone Radioactive Waste Repository and Updating of Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    2001-12-01

    The main objective of the project was to provide advice to the Latvian authorities on the safety enhancements and waste acceptance criteria for near surface radioactive waste disposal facilities of the Baldone repository. The project included the following main activities: Analysis of the current status of the management of radioactive waste in Latvia in general and, at the Baldone repository in particular Development of the short and long-term safety analysis of the Baldone repository, including: the planned increasing of capacity for disposal and long term storage, the radiological analysis for the post-closure period Development of the Environment Impact Statement, for the new foreseen installations, considering the non radiological components Proposal of recommendations for future updating of radioactive waste acceptance criteria Proposal of recommendations for safety upgrades to the facility. The work programme has been developed in phases and main tasks as follows. Phase 0: Project inception, Phase 1: Establishment of current status, plans and practices (Legislation, regulation and standards, Radioactive waste management, Waste acceptance criteria), Phase 2: Development of future strategies for long-term safety management and recommendations for safety enhancements. The project team found the general approach use at the installation, the basic design and the operating practices appropriate to international standards. Nevertheless, a number of items subject to potential improvements were also identified. These upgrading recommendations deal with general aspects of the management (mainly storage versus disposal of long-lived sources), site and environmental surveillance, packaging (qualification of containers, waste characterization requirements), the design of an engineered cap and strategies for capping. (author)

  16. Application of long range energy alternative planning (LEAP) model for Thailand energy outlook 2030 : reference case

    International Nuclear Information System (INIS)

    Charusiri, W.; Eua-arporn, B.; Ubonwat, J.

    2008-01-01

    In 2004, the total energy consumption in Thailand increased 8.8 per cent, from 47,806 to 60,260 ktoe. Long-range Energy Alternatives Planning (LEAP) is an accounting tool that simulates future energy scenarios. According to a Business As Usual (BAU) case, the overall energy demand in Thailand is estimated to increase from 61,262 to 254,200 ktoe between 2004 and 2030. Commercial energy consumption, which comprises petroleum products, natural gas, coal and its products, and electricity, increased by 9.0 per cent in Thailand in 2004, and new and renewable energy increased by 7.8 per cent. Nearly 60 per cent of the total commercial energy supply in Thailand was imported and increased for a fifth year in a row. The changes in energy consumption can be attributed to population growth and increase in economic activity and development. 10 refs., 5 tabs., 14 figs

  17. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  18. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  19. Long-term surveillance plan for the South Clive disposal site Clive, Utah

    International Nuclear Information System (INIS)

    1997-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. This LSTP describes the long-term surveillance program the DOE will implement to ensure the South Clive disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  20. OCRWM [Office of Civilian Radioactive Waste Management] Safety Plan

    International Nuclear Information System (INIS)

    1986-12-01

    The OCRWM Safety Plan sets forth management policies and general requirements for the safety of the public and of personnel associated with the Civilian Radioactive Waste Management Program (hereinafter called the ''Program''). It is applicable to all individuals and organizational elements of the Program, including all facilities and activities controlled by the Program pursuant to the Act, and to all phases of the Program. The plan defines the responsibilities assigned by the Director of the OCRWM to the various OCRWM line organizations, and to the contractors and the projects. It discusses the means by which safety policies and requirements will be communicated, and summarizes the applicable DOE Orders, and the procedures for reviewing, reporting, and evaluating safety problems. In addition, the OCRWM Safety Plan addresses DOE Orders applicable to occupational health and safety, worker protection, and public health and safety. OCRWM believes that it has an equally high level of commitment to both public safety and worker safety. The Plan also summarizes applicable NRC criteria and regulations that will be imposed through the formal licensing proceedings. While the Safety Plan sets forth OCRWM policy, it is not intended to be prescriptive in the details of implementation. Each OCRWM program element must develop and control its own set of detailed requirements for the protection of its workers and the public based on the principles set forth herein

  1. Strategic Planning and the Long-term R&D Plan

    International Nuclear Information System (INIS)

    Cooley, J.

    2015-01-01

    The Department of Safeguards of the International Atomic Energy Agency implements a structured strategic planning process to ensure that safeguards will continue to be both effective and efficient in the future. This process provides the Department with a comprehensive and coherent planning framework for the short (2 years), medium (6 years) and long (12 years) term. The Department's suite of planning documents includes a long-term strategic plan and an associated long-term research and development plan as well as a biennial development and implementation support programme. The Department's Long-Term Strategic Plan 2012-2023 addresses the conceptual framework for safeguards implementation, legal authority, technical capabilities (expertise, equipment and infrastructure) and the human and financial resources necessary for Agency verification activities. As research and development (R&D) are essential to meet the safeguards needs of the future, the Department-s Long-Term R&D Plan 2012-2023 is designed to support the Long-Term Strategic Plan 2012-2023 by setting out the capabilities that the Department needs to achieve its strategic objectives, and key milestones towards achieving those capabilities for which Member State R&D support is needed. The Long-Term R&D Plan 2012-2023 addresses the Department's R&D requirements in areas such as safeguards concepts and approaches; detection of undeclared nuclear material and activities; safeguards equipment and communication; information technology, collection, analysis and security; analytical services; new mandates; and training. Long-term capabilities discussed in the presentation include deployed systems (e.g., equipment at facilities); analytical (e.g., sample analysis), operational (e.g., staff expertise and skills) and readiness (e.g., safeguarding new types of facilities) capabilities. To address near-term development objectives and support the implementation of its verification activities as well as to

  2. Is it necessary to plan with safety margins for actively scanned proton therapy?

    Science.gov (United States)

    Albertini, F.; Hug, E. B.; Lomax, A. J.

    2011-07-01

    In radiation therapy, a plan is robust if the calculated and the delivered dose are in agreement, even in the case of different uncertainties. The current practice is to use safety margins, expanding the clinical target volume sufficiently enough to account for treatment uncertainties. This, however, might not be ideal for proton therapy and in particular when using intensity modulated proton therapy (IMPT) plans as degradation in the dose conformity could also be found in the middle of the target resulting from misalignments of highly in-field dose gradients. Single field uniform dose (SFUD) and IMPT plans have been calculated for different anatomical sites and the need for margins has been assessed by analyzing plan robustness to set-up and range uncertainties. We found that the use of safety margins is a good way to improve plan robustness for SFUD and IMPT plans with low in-field dose gradients but not necessarily for highly modulated IMPT plans for which only a marginal improvement in plan robustness could be detected through the definition of a planning target volume.

  3. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  4. Development plan. High activity-long living wastes project. Abstract

    International Nuclear Information System (INIS)

    2007-01-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  5. Challenges in miniaturized automotive long-range lidar system design

    Science.gov (United States)

    Fersch, Thomas; Weigel, Robert; Koelpin, Alexander

    2017-05-01

    This paper discusses the current technical limitations posed on endeavors to miniaturize lidar systems for use in automotive applications and how to possibly extend those limits. The focus is set on long-range scanning direct time of flight LiDAR systems using APD photodetectors. Miniaturization evokes severe problems in ensuring absolute laser safety while maintaining the systems' performance in terms of maximum range, signal-to-noise ratio, detection probability, pixel density, or frame rate. Based on hypothetical but realistic specifications for an exemplary system the complete lidar signal path is calculated. The maximum range of the system is used as a general performance indicator. It is determined with the minimum signal-to-noise ratio required to detect an object. Various system parameters are varied to find their impact on the system's range. The reduction of the laser's pulse width and the right choice for the transimpedance amplifier's amplification have shown to be practicable measures to double the system's range.

  6. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  7. Long-range research plan: FY 1984-FY 1988

    International Nuclear Information System (INIS)

    1982-08-01

    Information is presented concerning planned research activities related to LOCA and transients; LOFT; accident evaluation and mitigation; LMFBR and HTGR type reactors; facility operations and safeguards; waste management; siting and environment; and system and reliability analysis

  8. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  9. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  10. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  11. Climate Considerations in Long-Term Safety Assessments for Nuclear Waste Repositories

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, Jens-Ove; Brandefelt, Jenny; Claesson Liljedahl, Lillemor [Svensk Kaernbraenslehantering AB, Stockholm (Sweden)], E-mail: jens-ove.naslund@skb.se

    2013-05-15

    For a deep geological repository for spent nuclear fuel planned in Sweden, the safety assessment covers up to 1 million years. Climate scenarios range from high-end global warming for the coming 100 000 years, through deep permafrost, to large ice sheets during glacial conditions. In contrast, in an existing repository for short-lived waste the activity decays to low levels within a few tens of thousands of years. The shorter assessment period, 100 000 years, requires more focus on climate development over the coming tens of thousands of years, including the earliest possibility for permafrost growth and freezing of the engineered system. The handling of climate and climate change in safety assessments must be tailor-made for each repository concept and waste type. However, due to the uncertain future climate development on these vast time scales, all safety assessments for nuclear waste repositories require a range of possible climate scenarios.

  12. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  13. Long-term surveillance plan for the Mexican Hat disposal site Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1997-06-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Mexican Hat, Utah, disposal site. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Mexican Hat disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  14. Long-term surveillance plan for the Estes Gulch disposal site near Rifle, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site near Rifle, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Estes Gulch disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  15. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  16. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  17. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  18. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  19. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  20. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  1. The capabilities and constraints of the LEAP (Long-range Energy Alternatives Planning System) for development of energy matrix; As potencialidades e restricoes do LEAP (Long-range Energy Alternatives Planning System) para o desenvolvimento de matriz energetica

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Cruz, Ricardo Alexandre Passos da; Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    This paper seeks to introduce and discuss the main features of the LEAP model preparing energy matrixes, in the medium and long term energy planning context. These characteristics are analyzed and compared to other known simulation models used worldwide, checking potentialities and existing barriers of using the LEAP program (author)

  2. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  3. Climate considerations in long-term safety assessments for nuclear waste repositories.

    Science.gov (United States)

    Näslund, Jens-Ove; Brandefelt, Jenny; Liljedahl, Lillemor Claesson

    2013-05-01

    For a deep geological repository for spent nuclear fuel planned in Sweden, the safety assessment covers up to 1 million years. Climate scenarios range from high-end global warming for the coming 100 000 years, through deep permafrost, to large ice sheets during glacial conditions. In contrast, in an existing repository for short-lived waste the activity decays to low levels within a few tens of thousands of years. The shorter assessment period, 100 000 years, requires more focus on climate development over the coming tens of thousands of years, including the earliest possibility for permafrost growth and freezing of the engineered system. The handling of climate and climate change in safety assessments must be tailor-made for each repository concept and waste type. However, due to the uncertain future climate development on these vast time scales, all safety assessments for nuclear waste repositories require a range of possible climate scenarios.

  4. Planning report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    2003-06-01

    This document is a planning report for SKB's next assessment of long-term safety for a KBS 3 repository. The assessment, SR-Can, is to be finished by the end of 2005 and will be used for SKB's application to build an Encapsulation plant for spent nuclear fuel. Apart from outlining the methodology, the report discusses the handling in SR-Can of a number of important issues regarding the near field, the geosphere, the biosphere, the climatic evolution etc. The Swedish nuclear safety and radiation protection authorities have recently issued regulations concerning the final disposal of nuclear waste. The principal compliance criterion states that the annual risk of harmful effects must not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. There are also a number of requirements on methodological aspects of the safety assessment as well as on the contents of a safety report. The regulations are reproduced in an Appendix to this report. The primary safety function of the KBS 3 system is to completely isolate the spent nuclear fuel within copper canisters over the entire assessment period, which will be one million years in SR-Can. Should a canister be damaged, the secondary safety function is to retard any releases from the canisters. The main steps of the assessment are the following: 1. Qualitative system description, FEP processing: This step consists of defining a system boundary and of describing the system on a format suitable for the safety assessment. Databases of relevant features, events and processes influencing long-term safety are structured and used as one starting point for the assessment. 2. Initial state descriptions. 3. Process descriptions: In this step all identified processes within the system boundary involved in the long-term evolution of the system are described in detail. 4. Description of boundary conditions: This step is a broad description of the evolution of the boundaries of the system, focussing mainly

  5. Prospects for bioenergy use in Ghana using Long-range Energy Alternatives Planning model

    International Nuclear Information System (INIS)

    Kemausuor, Francis; Nygaard, Ivan; Mackenzie, Gordon

    2015-01-01

    As Ghana's economy grows, the choice of future energy paths and policies in the coming years will have a significant influence on its energy security. A Renewable Energy Act approved in 2011 seeks to encourage the influx of renewable energy sources in Ghana's energy mix. The new legal framework combined with increasing demand for energy has created an opportunity for dramatic changes in the way energy is generated in Ghana. However, the impending changes and their implication remain uncertain. This paper examines the extent to which future energy scenarios in Ghana could rely on energy from biomass sources, through the production of biogas, liquid biofuels and electricity. Analysis was based on moderate and high use of bioenergy for transportation, electricity generation and residential fuel using the LEAP (Long-range Energy Alternatives Planning) model. Results obtained indicate that introducing bioenergy to the energy mix could reduce GHG (greenhouse gas) emissions by about 6 million tonnes CO_2e by 2030, equivalent to a 14% reduction in a business-as-usual scenario. This paper advocates the use of second generation ethanol for transport, to the extent that it is economically exploitable. Resorting to first generation ethanol would require the allocation of over 580,000 ha of agricultural land for ethanol production. - Highlights: • This paper examines modern bioenergy contribution to Ghana's future energy mix. • Three scenarios are developed and analysed. • Opportunities exist for modern bioenergy to replace carbon intensive fuels. • Introducing modern bioenergy to the mix could result in a 14% reduction in GHG.

  6. Resonant long-range interactions between polar macromolecules

    International Nuclear Information System (INIS)

    Preto, Jordane; Pettini, Marco

    2013-01-01

    Motivated by its prospective biological relevance, the issue of resonant long-range interactions between two molecules displaying oscillating dipole moments is reinvestigated within the framework of classical electrodynamics. In particular, our findings shed new light on Fröhlich's theory of selective long-range interactions between biomolecules. First, terms of a very long-range kind – which have never been reported so far – are found in the interaction potential, due to field retardation. Second, at variance with a long-standing belief, it is shown that sizable resonant long-range interactions may exist only if the interacting system is out of thermal equilibrium.

  7. Development plan. High activity-long living wastes project. Abstract; Plan de developpement. Projet HAVL. Resume

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  8. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  9. Long-range correlated percolation

    International Nuclear Information System (INIS)

    Weinrib, A.

    1984-01-01

    This paper is a study of the percolation problem with long-range correlations in the site or bond occupations. An extension of the Harris criterion for the relevance of the correlations is derived for the case that the correlations decay as x/sup -a/ for large distances x. For a d the correlations are relevant if dν-2<0. Applying this criterion to the behavior that results when the correlations are relevant, we argue that the new behavior will have ν/sub long/ = 2/a. It is shown that the correlated bond percolation problem is equivalent to a q-state Potts model with quenched disorder in the limit q→1. With the use of this result, a renormalization-group study of the problem is presented, expanding in epsilon = 6-d and in delta = 4-a. In addition to the normal percolation fixed point, we find a new long-range fixed point. The crossover to this new fixed point follows the extended Harris criterion, and the fixed point has exponents ν/sub long/ = 2/a (as predicted) and eta/sub long/ = (1/11)(delta-epsilon). Finally, several results on the percolation properties of the Ising model at its critical point are shown to be in agreement with the predictions of this paper

  10. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  11. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  12. 12 CFR 308.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... time within which those steps will be taken. (c) Review of safety and soundness compliance plans... PRACTICE RULES OF PRACTICE AND PROCEDURE Submission and Review of Safety and Soundness Compliance Plans and... compliance plan. (a) Schedule for filing compliance plan—(1) In general. A bank shall file a written safety...

  13. Probing the role of long-range interactions in the dynamics of a long-range Kitaev chain

    Science.gov (United States)

    Dutta, Anirban; Dutta, Amit

    2017-09-01

    We study the role of long-range interactions (more precisely, the long-range superconducting gap term) on the nonequilibrium dynamics considering a long-range p -wave superconducting chain in which the superconducting term decays with distance between two sites in a power-law fashion characterized by an exponent α . We show that the Kibble-Zurek scaling exponent, dictating the power-law decay of the defect density in the final state reached following a slow (in comparison to the time scale associated with the minimum gap in the spectrum of the Hamiltonian) quenching of the chemical potential μ across a quantum critical point, depends nontrivially on the exponent α as long as α 2 , we find that the exponent saturates to the corresponding well-known value of 1 /2 expected for the short-range model. Furthermore, studying the dynamical quantum phase transitions manifested in the nonanalyticities in the rate function of the return possibility I (t ) in subsequent temporal evolution following a sudden change in μ , we show the existence of a new region; in this region, we find three instants of cusp singularities in I (t ) associated with a single sector of Fisher zeros. Notably, the width of this region shrinks as α increases and vanishes in the limit α →2 , indicating that this special region is an artifact of the long-range nature of the Hamiltonian.

  14. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  15. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  16. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  17. Long-term criticality safety concerns associated with surplus fissile material disposition

    International Nuclear Information System (INIS)

    Choi, J.S.

    1995-01-01

    A substantial inventory of surplus fissile material would result from ongoing and planned dismantlement of US and Russian nuclear weapons. This surplus fissile material could be dispositioned by irradiation in nuclear reactors, and the resulting spent MOx fuel would be similar in radiation characteristics to regular LWR spent UO2 fuel. The surplus fissile material could also be immobilized into high-level waste forms, such as borosilicate glass, synroc, or metal-alloy matrix. The MOx spent fuel, or the immobilized waste forms, could then be directly disposed of in a geologic repository. Long-term criticality safety concerns arise because the fissile contents (i.e., Pu-239 and its decay daughter U-235) in these waste forms are higher than in LWR spent UO2 fuel. MOx spent fuel could contain 3 to 4 wt% of reactor-grade plutonium, compared to only 0.9 wt% of plutonium in LWR spent UO2 fuel. At some future time (tens of thousand of years), when the waste forms had deteriorated due to intruding groundwater, the water could mix with the long-lived fissile materials to form into a critical system. If the critical system is self-sustaining, somewhat like the natural-occurring reactor in OKLO, fission products produced could readily be available for dissolution and release out to the accessible environment, adversely affecting public health and safety. This paper will address ongoing activities to evaluate long-term criticality safety concerns associated with disposition of fissile material in a geologic setting. Issues to be addressed include the identification of a worst-case water-intrusion scenario and waste-form geometries which present the most concern for long-term criticality safety; and suggests of technical solutions for such concerns

  18. Long-term safety of the maintenance and decommissioning waste of the encapsulation plant

    International Nuclear Information System (INIS)

    Nummi, O.; Kylloenen, J.; Eurajoki, T.

    2012-12-01

    This report, Long-term safety of the maintenance and decommissioning waste of the encapsulation plant, presents the disposal concept for the low and intermediate level waste (L/ILW) that is generated during the operation and decommissioning of the encapsulation plant, and assesses the long-term safety of the disposal of the waste. Radioactive waste originates from the spent nuclear fuel transferred and dried in the encapsulation plant. Radioactive waste accumulates also in the maintenance of the components and systems of the encapsulation plant. The waste is collected, exempted from control if possible and treated for final disposal if necessary. The waste is disposed of in the L/ILW hall which is currently planned to be located at a depth of -180 meters along the access tunnel to the repository for spent fuel. The main engineered barrier in the L/ILW hall is a concrete basin that encases the dried liquid waste. The safety concept of L/ILW disposal is based on the slow release of radioactivity from the L/ILW hall and its limited transport through the bedrock into biosphere. The release and transport of the radioactivity is described by the assessment scenarios, which include expected evolution and unlikely events affecting the long-term safety. The scenarios act as guidelines according to which the conceptual and mathematical models are formed. The long-term safety of the L/ILW hall is assessed using deterministic and probabilistic modeling. Special issues such as human intrusion and radiation effects on other biota are also assessed. The most significant contributor to the dose rates is the short-lived radionuclide 90 Sr followed by long-lived nuclides 129 I and 108 mAg. The annual doses to the public, and release rates of radioactive substances stay below the regulatory constraints in all analyzed scenarios. (orig.)

  19. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  20. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  1. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  2. Pitavastatin demonstrates long-term efficacy, safety and tolerability in elderly patients with primary hypercholesterolaemia or combined (mixed) dyslipidaemia

    DEFF Research Database (Denmark)

    Stender, Steen; Budinski, Dragos; Hounslow, Neil

    2013-01-01

    Aims: To assess the long-term efficacy, safety and tolerability of pitavastatin (2 and 4 mg) in elderly patients (≥65 years of age) with primary hypercholesterolaemia or combined (mixed) dyslipidaemia.Design: Patients (n = 545) who had completed a 12-week double-blind comparative study (core study...... Cholesterol Education Program Adult Treatment Plan III (NCEP ATP III) targets for low-density lipoprotein cholesterol (LDL-C) was determined.Results: Of the patients enrolled, 539 received at least one dose of pitavastatin (safety population: men, 45.5%; Caucasian, 99.1%; mean age, 70.3 years; range, 65......-89 years). Only 17% of patients required up-titration to pitavastatin 4 mg. After 60 weeks, NCEP ATP III and EAS targets were attained by 93.8% and 89.0% of patients, respectively. Plasma LDL-C declined by 43.4% and high-density lipoprotein cholesterol increased by 9.6% versus core-study baseline values...

  3. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  4. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  5. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  6. Long-term capital planning considering nuclear plant life-cycle management

    International Nuclear Information System (INIS)

    Negin, C.A.; Simpson, J.M.; Hostetler, D.R.

    1992-09-01

    The creation of a Life Cycle Management (LCM) group at utilities to evaluate the long term capital refurbishment needs is gaining favor. Among the functions of such groups can be the responsibility for recommending long term capital planning projects based on results of evaluations of systems, structures, and components that are not only essential to achieving the full current license term of operation, but also to extend the service life of the plant. Making such recommendations, in content and timing, requires the ability to view all recommendations in the context of an overall capital budget and long range outage impacts. This report illustrates an approach for creating a Long-Term Capital Plan with methods for deciding on, compiling, integrating, and presenting projects from the perspective of an LCM program for a nuclear power plant. It also addresses a rationale for capitalization of LCM program activities that would not be allowed under current accounting treatment

  7. A Long-term Plan for Kalk

    DEFF Research Database (Denmark)

    2017-01-01

    In this case, the author demonstrates together with the owner-manager of KALK A/S, Mr Rasmus Jorgensen, how to use the Family Business Map to frame a constructive discussion about long-term planning. The Family Business Map is a tool for long-term planning in family firms developed by Professor...

  8. Long-range spin deformations around quasiparticles

    International Nuclear Information System (INIS)

    Godfrey, M.; Gunn, M.

    1989-01-01

    The quasi-particle formed by a hole in a Heisenberg antiferromagnet has an associated long-range spin distortion whose amplitude increases with the velocity of the hole. The authors show that the existence and properties of this distortion follow from simple classical arguments based on the long-wavelength equations of motion for the spin system. A similar long-range distortion is found in the quantum-mechanical problem of an electron exchange coupled to a Heisenberg antiferromagnet

  9. Long-term surveillance plan for the Burro Canyon disposal cell Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Burro Canyon disposal cell in San Miguel County, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Burro Canyon disposal cell performs as designed and is cared for in a manner that protects the public health and safety and the environment. The program is based on site inspections to identify threats to disposal cell integrity. Before each disposal cell is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  10. Heart rate, multiple body temperature, long-range and long-life telemetry system for free-ranging animals

    Science.gov (United States)

    Lund, G. F.; Westbrook, R. M.; Fryer, T. B.

    1980-01-01

    The design details and rationale for a versatile, long-range, long-life telemetry data acquisition system for heart rates and body temperatures at multiple locations from free-ranging animals are presented. The design comprises an implantable transmitter for short to medium range transmission, a receiver retransmitter collar to be worn for long-range transmission, and a signal conditioner interface circuit to assist in signal discrimination and demodulation of receiver or tape-recorded audio outputs. Implanted electrodes are used to obtain an ECG, from which R-wave characteristics are selected to trigger a short RF pulse. Pulses carrying heart rate information are interrupted periodically by a series of pulse interval modulated RF pulses conveying temperature information sensed at desired locations by thermistors. Pulse duration and pulse sequencing are used to discriminate between heart rate and temperature pulses as well as radio frequency interference. The implanted transmitter may be used alone for medium and short-range tracking, or with a receiver-transmitter collar that employs commercial tracking equipment for transmissions of up to 12 km. A system prototype has been tested on a dog.

  11. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  12. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  13. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  14. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  15. Planning report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    This document is a planning report for SKB's next assessment of long-term safety for a KBS 3 repository. The assessment, SR-Can, is to be finished by the end of 2005 and will be used for SKB's application to build an Encapsulation plant for spent nuclear fuel. Apart from outlining the methodology, the report discusses the handling in SR-Can of a number of important issues regarding the near field, the geosphere, the biosphere, the climatic evolution etc. The Swedish nuclear safety and radiation protection authorities have recently issued regulations concerning the final disposal of nuclear waste. The principal compliance criterion states that the annual risk of harmful effects must not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk. There are also a number of requirements on methodological aspects of the safety assessment as well as on the contents of a safety report. The regulations are reproduced in an Appendix to this report. The primary safety function of the KBS 3 system is to completely isolate the spent nuclear fuel within copper canisters over the entire assessment period, which will be one million years in SR-Can. Should a canister be damaged, the secondary safety function is to retard any releases from the canisters. The main steps of the assessment are the following: 1. Qualitative system description, FEP processing: This step consists of defining a system boundary and of describing the system on a format suitable for the safety assessment. Databases of relevant features, events and processes influencing long-term safety are structured and used as one starting point for the assessment. 2. Initial state descriptions. 3. Process descriptions: In this step all identified processes within the system boundary involved in the long-term evolution of the system are described in detail. 4. Description of boundary conditions: This step is a broad description of the evolution of the boundaries of the system

  16. Ares-I-X Vehicle Preliminary Range Safety Malfunction Turn Analysis

    Science.gov (United States)

    Beaty, James R.; Starr, Brett R.; Gowan, John W., Jr.

    2008-01-01

    Ares-I-X is the designation given to the flight test version of the Ares-I rocket (also known as the Crew Launch Vehicle - CLV) being developed by NASA. As part of the preliminary flight plan approval process for the test vehicle, a range safety malfunction turn analysis was performed to support the launch area risk assessment and vehicle destruct criteria development processes. Several vehicle failure scenarios were identified which could cause the vehicle trajectory to deviate from its normal flight path, and the effects of these failures were evaluated with an Ares-I-X 6 degrees-of-freedom (6-DOF) digital simulation, using the Program to Optimize Simulated Trajectories Version 2 (POST2) simulation framework. The Ares-I-X simulation analysis provides output files containing vehicle state information, which are used by other risk assessment and vehicle debris trajectory simulation tools to determine the risk to personnel and facilities in the vicinity of the launch area at Kennedy Space Center (KSC), and to develop the vehicle destruct criteria used by the flight test range safety officer. The simulation analysis approach used for this study is described, including descriptions of the failure modes which were considered and the underlying assumptions and ground rules of the study, and preliminary results are presented, determined by analysis of the trajectory deviation of the failure cases, compared with the expected vehicle trajectory.

  17. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  18. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  19. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  20. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  1. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  2. Validation and verification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V ampersand V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements

  3. Unitarity corrections to short-range order long-range rapidity correlations

    CERN Document Server

    Capella, A

    1978-01-01

    Although the effective hadronic forces have short range in rapidity space, one nevertheless expects long-range dynamical correlations induced by unitarity constraints. This paper contains a thorough discussion of long-range rapidity correlations in high-multiplicity events. In particular, the authors analyze in detail the forward- backward multiplicity correlations, measured recently in the whole CERN ISR energy range. They find from these data that the normalized variance of the number n of exchanged cut Pomerons, ((n/(n)-1)/sup 2/) , is most probably in the range 0.32 to 0.36. They show that such a number is obtained from Reggeon theory in the eikonal approximation. The authors also predict a very specific violation of local compensation of charge in multiparticle events: The violation should appear in the fourth-order zone correlation function and is absent in the second-order correlation function, the only one measured until now. (48 refs).

  4. Passive long range acousto-optic sensor

    Science.gov (United States)

    Slater, Dan

    2006-08-01

    Alexander Graham Bell's photophone of 1880 was a simple free space optical communication device that used the sun to illuminate a reflective acoustic diaphragm. A selenium photocell located 213 m (700 ft) away converted the acoustically modulated light beam back into sound. A variation of the photophone is presented here that uses naturally formed free space acousto-optic communications links to provide passive multichannel long range acoustic sensing. This system, called RAS (remote acoustic sensor), functions as a long range microphone with a demonstrated range in excess of 40 km (25 miles).

  5. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  6. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  7. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  8. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  9. 12 CFR 30.4 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...

  10. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  11. Long-range correlation and market segmentation in bond market

    Science.gov (United States)

    Wang, Zhongxing; Yan, Yan; Chen, Xiaosong

    2017-09-01

    This paper investigates the long-range auto-correlations and cross-correlations in bond market. Based on Detrended Moving Average (DMA) method, empirical results present a clear evidence of long-range persistence that exists in one year scale. The degree of long-range correlation related to maturities has an upward tendency with a peak in short term. These findings confirm the expectations of fractal market hypothesis (FMH). Furthermore, we have developed a method based on a complex network to study the long-range cross-correlation structure and applied it to our data, and found a clear pattern of market segmentation in the long run. We also detected the nature of long-range correlation in the sub-period 2007-2012 and 2011-2016. The result from our research shows that long-range auto-correlations are decreasing in the recent years while long-range cross-correlations are strengthening.

  12. Priming patient safety: A middle-range theory of safety goal priming via safety culture communication.

    Science.gov (United States)

    Groves, Patricia S; Bunch, Jacinda L

    2018-05-18

    The aim of this paper is discussion of a new middle-range theory of patient safety goal priming via safety culture communication. Bedside nurses are key to safe care, but there is little theory about how organizations can influence nursing behavior through safety culture to improve patient safety outcomes. We theorize patient safety goal priming via safety culture communication may support organizations in this endeavor. According to this theory, hospital safety culture communication activates a previously held patient safety goal and increases the perceived value of actions nurses can take to achieve that goal. Nurses subsequently prioritize and are motivated to perform tasks and risk assessment related to achieving patient safety. These efforts continue until nurses mitigate or ameliorate identified risks and hazards during the patient care encounter. Critically, this process requires nurses to have a previously held safety goal associated with a repertoire of appropriate actions. This theory suggests undergraduate educators should foster an outcomes focus emphasizing the connections between nursing interventions and safety outcomes, hospitals should strategically structure patient safety primes into communicative activities, and organizations should support professional development including new skills and the latest evidence supporting nursing practice for patient safety. © 2018 John Wiley & Sons Ltd.

  13. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1996-05-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment.For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP

  14. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  15. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  16. Long-range plan for buried transuranic waste studies at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Berreth, P.D.; Fischer, D.K.; Suckel, R.A.

    1984-11-01

    This document presents a plan to perform detailed studies of alternatives considered for the long-term management of buried transuranic waste at the INEL. The studies will provide the technical basis for DOE to make a decision on the future management of that waste. Although the waste is currently being handled in an acceptable manner, new solutions are continually being researched to improve handling techniques. Three alternatives are being considered: (a) leave the waste as is; (b) improve in situ confinement of the waste; (c) retrieve, process, and certify the waste for disposal at a federal repository. Fifteen studies are described in this plan for the latter two alternatives. The leave-as-is alternative involves continuing present procedures for managing the buried waste. An ongoing environmental surveillance program, a low-level-waste stabilization program, and enhanced subsurface migration studies begun in FY-1984 at the INEL will provide data for the decision-making process for INEL buried TRU waste. These ongoing studies for the leave-as-is alternative are summarized in this plan in limited detail. The improved-confinement alternative involves leaving the waste in place, but providing additional protection against wind water penetration, erosion, and plant and animal intrusion. Several studies proposed will examine special techniques to immobilize or encapsulate the buried waste. Studies of the third alternative will investigate improved retrieval, processing and certification techniques. New equipment, such as industrial manipulators and excavating machinery, will be tested in the retrieval studies. Processing and certification studies will examine rapidly changing or new technologies. 19 references, 8 figures, 4 tables

  17. Degeneracy and long-range correlation: A simulation study

    Directory of Open Access Journals (Sweden)

    Marmelat Vivien

    2011-12-01

    Full Text Available We present in this paper a simulation study that aimed at evidencing a causal relationship between degeneracy and long-range correlations. Long-range correlations represent a very specific form of fluctuations that have been evidenced in the outcomes time series produced by a number of natural systems. Long-range correlations are supposed to sign the complexity, adaptability and flexibility of the system. Degeneracy is defined as the ability of elements that are structurally different to perform the same function, and is presented as a key feature for explaining the robustness of complex systems. We propose a model able to generate long-range correlated series, and including a parameter that account for degeneracy. Results show that a decrease in degeneracy tends to reduce the strength of long-range correlation in the series produced by the model.

  18. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  19. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal year 2016

    International Nuclear Information System (INIS)

    Ishimaru, Tsuneari; Yasue, Kenichi; Kokubu, Yoko; Niwa, Masakazu; Asamori, Koichi; Watanabe, Takahiro; Yokoyama, Tatsunori; Fujita, Natsuko; Shimizu, Mayuko; Hama, Yuki

    2016-08-01

    This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of high-level radioactive waste (HLW) in Japan Atomic Energy Agency, in fiscal year 2016. The objectives and contents in fiscal year 2016 are described in detail based on the outline of 7 years plan (fiscal years 2015-2021). Background of this research is clarified with the necessity and the significance for site investigation and safety assessment, and the past progress in this report. In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  20. Characterizing short-range vs. long-range spatial correlations in dislocation distributions

    International Nuclear Information System (INIS)

    Chevy, Juliette; Fressengeas, Claude; Lebyodkin, Mikhail; Taupin, Vincent; Bastie, Pierre; Duval, Paul

    2010-01-01

    Hard X-ray diffraction experiments have provided evidence of a strongly heterogeneous distribution of dislocation densities along the axis of cylindrical ice single crystals oriented for basal slip in torsion creep. The dislocation arrangements showed a complex scale-invariant character, which was analyzed by means of statistical and multifractal techniques. A trend to decreasing autocorrelation of the dislocation distribution was observed as deformation proceeds. At low strain levels, long-range spatial correlations control the distribution, but short-range correlations in relation with cross-slip progressively prevail when strain increases. This trend was reproduced by a model based on field dislocation dynamics, a theory accounting for both long-range elastic interactions and short-range interactions through transport of dislocation densities.

  1. Characterizing short-range vs. long-range spatial correlations in dislocation distributions

    Energy Technology Data Exchange (ETDEWEB)

    Chevy, Juliette, E-mail: juliette.chevy@gmail.com [Laboratoire de Glaciologie et Geophysique de l' Environnement-CNRS, 54 rue Moliere, 38402 St. Martin d' Heres (France)] [Laboratoire Science et Ingenierie des Materiaux et Procedes, Grenoble INP-CNRS-UJF, BP 75, 38402 St. Martin d' Heres Cedex (France); Fressengeas, Claude; Lebyodkin, Mikhail; Taupin, Vincent [Laboratoire de Physique et Mecanique des Materiaux, Universite Paul Verlaine-Metz/CNRS, Ile du Saulcy, 57045 Metz Cedex (France); Bastie, Pierre [Laboratoire de Spectrometrie Physique, BP 87, 38402 St. Martin d' Heres Cedex (France)] [Institut Laue Langevin, BP 156, 38042 Grenoble Cedex 9 (France); Duval, Paul [Laboratoire de Glaciologie et Geophysique de l' Environnement-CNRS, 54 rue Moliere, 38402 St. Martin d' Heres (France)

    2010-03-15

    Hard X-ray diffraction experiments have provided evidence of a strongly heterogeneous distribution of dislocation densities along the axis of cylindrical ice single crystals oriented for basal slip in torsion creep. The dislocation arrangements showed a complex scale-invariant character, which was analyzed by means of statistical and multifractal techniques. A trend to decreasing autocorrelation of the dislocation distribution was observed as deformation proceeds. At low strain levels, long-range spatial correlations control the distribution, but short-range correlations in relation with cross-slip progressively prevail when strain increases. This trend was reproduced by a model based on field dislocation dynamics, a theory accounting for both long-range elastic interactions and short-range interactions through transport of dislocation densities.

  2. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  3. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    International Nuclear Information System (INIS)

    T. Haney R. VanHorn

    2007-01-01

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used to determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality

  4. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  5. French Approach for Long Term Storage Safety

    International Nuclear Information System (INIS)

    Marciano, Jacob; Carreton, Jean-Pierre; Lizot, Marie Therese; Lhomme, Veronique

    2014-01-01

    IRSN presents its statement regarding long-term storage facilities; in France, the regulatory documents do not define the long term duration. The storage facility lifetime can only be appreciated according to the needs and materials stored therein. However, the magnitude of the long-term can be estimated at a few hundred years compared to a few decades for current storage. Usually, in France, construction of storage facilities is driven from the necessity various necessities, linked to the management of radioactive material (eg spent fuel) and to the management of radioactive waste. Because of the variety of 'stored materials and objects' (fission product solutions, plutonium oxide powders, activated solids, drums containing technological waste, spent fuel...), a great number of storage facility design solutions have been developed (surface, subsurface areas, dry or wet conditions...) in the World. After describing the main functions of a storage facility, IRSN displays the safety principles and the associated design principles. The specific design principles applied to particular storage (dry or wet spent fuel storage, depleted uranium or reprocessed uranium storage, plutonium storage, waste containing tritium storage, HLW and ILLW storage...) are also presented. Finally, the concerns due to the long-term duration storage and related safety assessment are developed. After discussing these issues, IRSN displays its statement. The authorization procedures governing the facility lifetime are similar to those of any basic nuclear installation, the continuation of the facility operation remaining subject to periodic safety reviews (in France, every 10 years). The applicant safety cases have to show, that the safety requirements are always met; this requires, at minimum, to take into account at the design stage, comfortable design margins. (author)

  6. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  7. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  8. Heteronuclear Long-Range Correlation

    DEFF Research Database (Denmark)

    Sørensen, Ole W.

    The lecture will cover heteronuclear long-range correlation techniques like HMBC, H2BC, and HAT HMBC with the emphasis on determining the number of covalent bonds between two spins being correlated. H2BC and HMBC spectra are quite complementary as a peak can be strong in one of the two spectra...

  9. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  10. EG and G long-range hazardous waste program plan

    International Nuclear Information System (INIS)

    1985-02-01

    The purpose of this document is to develop and implement a program for safe, economic management of hazardous and radioactive mixed waste generated, transported, treated, stored, or disposed of by EG and G Idaho operated facilities. The initial part of this program involves identification and characterization of EG and G-generated hazardous and radioactive mixed waste, and activities for corrective action, including handling, packaging, and shipping of these wastes off site for treatment, storage, and/or disposal, or for interim remedial action. The documentation necessary for all areas of the plan is carefully defined, so as to ensure compliance, at every step, with the requisite orders and guidelines. A second part of this program calls for assessment, and possible development and implementation of a treatment, storage, and disposal (T/S/D) program for special hazardous and radioactive mixed wastes which cannot practically, economically, and safely be disposed of at off-site facilities. This segment of the plan addresses obtaining permits for the existing Waste Experimental Reduction Facility (WERF) incinerator and for the construction of an adjacent hazardous waste solidification facility and a storage area. The permitting and construction of a special hazardous waste treatment and storage facility is also explored. The report investigates permitting the Hazardous Waste Storage Facility (HWSF) as a permanent storage facility

  11. Continuous limit of discrete systems with long-range interaction

    International Nuclear Information System (INIS)

    Tarasov, Vasily E

    2006-01-01

    Discrete systems with long-range interactions are considered. Continuous medium models as continuous limit of discrete chain system are defined. Long-range interactions of chain elements that give the fractional equations for the medium model are discussed. The chain equations of motion with long-range interaction are mapped into the continuum equation with the Riesz fractional derivative. We formulate the consistent definition of continuous limit for the systems with long-range interactions. In this paper, we consider a wide class of long-range interactions that give fractional medium equations in the continuous limit. The power-law interaction is a special case of this class

  12. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  13. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  14. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  15. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  16. Long range correlations in condensed matter

    International Nuclear Information System (INIS)

    Bochicchio, R.C.

    1990-01-01

    Off diagonal long range order (ODLRO) correlations are strongly related with the generalized Bose-Einstein condensation. Under certain boundary conditions, one implies the other. These phenomena are of great importance in the description of quantum situations with a macroscopic manifestation (superfluidity, superconductivity, etc.). Since ion pairs are not bosons, the definition of ODLRO is modified. The information contained with the 2-particle propagator (electron pairs) and the consequences that lead to pairs statistics are shown in this presentation. The analogy between long range correlations and fluids is also analyzed. (Author). 17 refs

  17. Spectral long-range interaction of temporal incoherent solitons.

    Science.gov (United States)

    Xu, Gang; Garnier, Josselin; Picozzi, Antonio

    2014-02-01

    We study the interaction of temporal incoherent solitons sustained by a highly noninstantaneous (Raman-like) nonlinear response. The incoherent solitons exhibit a nonmutual interaction, which can be either attractive or repulsive depending on their relative initial distance. The analysis reveals that incoherent solitons exhibit a long-range interaction in frequency space, which is in contrast with the expected spectral short-range interaction described by the usual approach based on the Raman-like spectral gain curve. Both phenomena of anomalous interaction and spectral long-range behavior of incoherent solitons are described in detail by a long-range Vlasov equation.

  18. Long-range plan for buried transuranic waste studies at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Low, J.O.

    1985-12-01

    This document presents a plan to perform detailed studies of alternatives considered for the long-term management of buried transuranic waste at the Idaho National Engineering Laboratory (INEL). The studies will provide the technical basis for DOE to make a decision on the future management of that waste. Although the waste is currently being handled in an acceptable manner, new solutions are continually being researched to improve management techniques. Three alternatives are being considered: (a) leave the waste as is; (b) improve in situ confinement of the waste; and (c) retrieve, process, and certify the waste for disposal at a federal repository. Fourteen studies are described in this plan for Alternatives 2 and 3. The leave-as-is alternative involves continuing present procedures for managing the buried waste. An ongoing environmental surveillance program, a low-level-waste stabilization program, and enhanced subsurface migration studies begun in FY-1984 at the INEL will provide data for the decision-making process for the INEL buried TRU waste. These ongoing studies for the leave-as-is alternative are summarized in this plan in limited detail. The improved-confinement alternative involves leaving the waste in place, but providing additional protection against wind, water penetration, erosion, and plant and animal intrusion. Several studies proposed under this alternative will examine special techniques to immobilize or encapsulate the buried waste. An in situ grouting study was implemented at the INEL starting in FY-1985 and will be completed at the end of FY-1986 with the grouting of a simulated INEL buried TRU waste trench. Studies of the third alternative will investigate improved retrieval, processing, and certification techniques. New equipment, such as industrial manipulators and excavating machinery, will be tested in the retrieval studies. Processing and certification studies will examine rapidly changing or new technologies

  19. Long-term surveillance plan for the Gunnison, Colorado disposal site. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance

  20. Long-range interactions in lattice field theory

    International Nuclear Information System (INIS)

    Rabin, J.M.

    1981-06-01

    Lattice quantum field theories containing fermions can be formulated in a chirally invariant way provided long-range interactions are introduced. It is established that in weak-coupling perturbation theory such a lattice theory is renormalizable when the corresponding continuum theory is, and that the continuum theory is indeed recovered in the perturbative continuum limit. In the strong-coupling limit of these theories one is led to study an effective Hamiltonian describing a Heisenberg antiferromagnet with long-range interactions. Block-spin renormalization group methods are used to find a critical rate of falloff of the interactions, approximately as inverse distance squared, which separates a nearest-neighbor-antiferromagnetic phase from a phase displaying identifiable long-range effects. A duality-type symmetry is present in some block-spin calculations

  1. Long-range interactions in lattice field theory

    Energy Technology Data Exchange (ETDEWEB)

    Rabin, J.M.

    1981-06-01

    Lattice quantum field theories containing fermions can be formulated in a chirally invariant way provided long-range interactions are introduced. It is established that in weak-coupling perturbation theory such a lattice theory is renormalizable when the corresponding continuum theory is, and that the continuum theory is indeed recovered in the perturbative continuum limit. In the strong-coupling limit of these theories one is led to study an effective Hamiltonian describing a Heisenberg antiferromagnet with long-range interactions. Block-spin renormalization group methods are used to find a critical rate of falloff of the interactions, approximately as inverse distance squared, which separates a nearest-neighbor-antiferromagnetic phase from a phase displaying identifiable long-range effects. A duality-type symmetry is present in some block-spin calculations.

  2. Long-term surveillance plan for the Rifle, Colorado, Disposal site

    International Nuclear Information System (INIS)

    1996-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site in Garfield County, Colorado. The U.S. Environmental Protection Agency (EPA) has developed regulations for the issuance of a general license by the U.S. Nuclear Regulatory Commission (NRC) for the custody and long-term care of UMTRA Project disposal Sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites, will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Estes Gulch disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Estes Gulch site and the NRC formally accepts this LTSP

  3. Evaluation procedure of software safety plan for digital I and C of KNGR

    International Nuclear Information System (INIS)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4

  4. Evaluation procedure of software safety plan for digital I and C of KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4.

  5. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  6. Long range implantation by MEVVA metal ion source

    International Nuclear Information System (INIS)

    Zhang Tonghe; Wu Yuguang; Ma Furong; Liang Hong

    2001-01-01

    Metal vapor vacuum arc (MEVVA) source ion implantation is a new technology used for achieving long range ion implantation. It is very important for research and application of the ion beam modification of materials. The results show that the implanted atom diffusion coefficient increases in Mo implanted Al with high ion flux and high dose. The implanted depth is 311.6 times greater than that of the corresponding ion range. The ion species, doses and ion fluxes play an important part in the long-range implantation. Especially, thermal atom chemistry have specific effect on the long-range implantation during high ion flux implantation at transient high target temperature

  7. Long-range eye tracking: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Jayaweera, S.K.; Lu, Shin-yee

    1994-08-24

    The design considerations for a long-range Purkinje effects based video tracking system using current technology is presented. Past work, current experiments, and future directions are thoroughly discussed, with an emphasis on digital signal processing techniques and obstacles. It has been determined that while a robust, efficient, long-range, and non-invasive eye tracking system will be difficult to develop, such as a project is indeed feasible.

  8. Long-range goal setting in the nuclear utility industry

    International Nuclear Information System (INIS)

    Beard, P.M.

    1986-01-01

    The Institute of Nuclear Power Operation's (INPO's) programs support the industry's efforts to improve performance in nuclear plant safety and reliability. The success of these programs can best be measured by the progress of the industry. As utilities focused their attention on nuclear plant performance, the Institute's goal was to make sure its programs and activities provided the best possible support for these efforts. INPO continues to coordinate an industry-wide plant performance indicator program to assist member utilities in assessing station performance. Closely related to this effort is the nuclear industry's establishment of long-range plant performance goals. The US nuclear utility industry currently sends INPO quarterly data on 28 key performance indicators. INPO analyzes these data and provides periodic reports to its members and participants. Selected highlights of INPO's Performance Indicators for the US Nuclear Utility, dated June 1986, are discussed. Throughout 1985, INPO interacted with members, participants, and three external ad hoc review groups to refine the overall performance indicators and to develop background for each unit. By April 1986, each utility had developed long-term goals for each unit. By April 1986, each utility had developed long-term goals for most of the overall indicators. These goals represent a commitment to achievement of excellence when applied to the day-to-day conduct of plant operations, and provide a framework for action

  9. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney disposal site. The site is in Mesa County near Grand Junction, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects public health and safety and the environment. Before each disposal site may be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Cheney disposal site. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete and the NRC formally accepts this plan. This document describes the long-term surveillance program the DOE will implement to ensure that the Cheney disposal site performs as designed. The program is based on site inspections to identify potential threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  10. Long-range antigravity

    Energy Technology Data Exchange (ETDEWEB)

    Macrae, K.I.; Riegert, R.J. (Maryland Univ., College Park (USA). Center for Theoretical Physics)

    1984-10-01

    We consider a theory in which fermionic matter interacts via long-range scalar, vector and tensor fields. In order not to be in conflict with experiment, the scalar and vector couplings for a given fermion must be equal, as is natural in a dimensionally reduced model. Assuming that the Sun is not approximately neutral with respect to these new scalar-vector charges, and if the couplings saturate the experimental bounds, then their strength can be comparable to that of gravity. Scalar-vector fields of this strength can compensate for a solar quadrupole moment contribution to Mercury's anomalous perihelion precession.

  11. Long-range antigravity

    International Nuclear Information System (INIS)

    Macrae, K.I.; Riegert, R.J.

    1984-01-01

    We consider a theory in which fermionic matter interacts via long-range scalar, vector and tensor fields. In order not to be in conflict with experiment, the scalar and vector couplings for a given fermion must be equal, as is natural in a dimensionally reduced model. Assuming that the Sun is not approximately neutral with respect to these new scalar-vector charges, and if the couplings saturate the experimental bounds, then their strength can be comparable to that of gravity. Scalar-vector fields of this strength can compensate for a solar quadrupole moment contribution to Mercury's anomalous perihelion precession. (orig.)

  12. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  13. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  14. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  15. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  16. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  17. Assessment of the long-term safety of repositories. Scientific basis

    International Nuclear Information System (INIS)

    Noseck, Ulrich; Becker, Dirk; Fahrenholz, Christine

    2008-12-01

    The project contributed to increase the scientific knowledge on the long-term safety assessment and the safety cases of a radioactive waste repository. International guidelines and more recent safety cases from other countries were evaluated. The feasibility study of the three safety indicators ''individual dose rate'', ''radiotoxicity concentration in the biosphere water'' and ''radiotoxicity flux from the geosphere'' showed that due to the independently derived corresponding reference values these indicators describe three different safety statements. The combination of the three values can give a stronger argument for the safety of the repository system. Another important methodological aspect of the safety cases is the definition and selection of scenarios, one of these the human intrusion scenario. Various human intrusion scenarios are considered in the different nations, which differ significantly with respect to type and time scale, the exposition type and exposition pathway. Further progress has been achieved in how to treat human intrusion scenarios in a German post-closure safety case. Another port of the project dealt with the impact of specific geochemical processes on the long-term safety of the repository. The impact of climate changes on the long-term safety of a radioactive waste repository in rock salt was investigated with respect to processes in the overburden and the biosphere where highest impact is expected. Sofa simplified models and only discrete climate estates have been considered

  18. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  19. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  20. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  1. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  2. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  3. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  4. Are long physician working hours harmful to patient safety?

    Science.gov (United States)

    Ehara, Akira

    2008-04-01

    Pediatricians of Japanese hospitals including not only residents but also attending physicians work long hours, and 8% work for >79 h per week. Most of them work consecutively for >or=32 h when they are on call. The aim of the present study was to evaluate the effect of long work hours on patient safety. The electronic databases MEDLINE and EMBASE to searched identify the English- and Japanese-language literature for studies on work hours, medical errors, patient safety, and malpractice for years 1966-2005. Studies that analyzed the relationship between physician work hours and outcomes directly related to patient safety were selected. Seven studies met the criteria. Four studies suggest that reduction of work hours has a favorable effect on patient safety indicators. In the other three studies no significant changes of the indicators were observed, but no report found that shorter work hours were harmful to patient safety. Decrease of physician work hours is not harmful but favorable to patient safety.

  5. Memory and long-range correlations in chess games

    Science.gov (United States)

    Schaigorodsky, Ana L.; Perotti, Juan I.; Billoni, Orlando V.

    2014-01-01

    In this paper we report the existence of long-range memory in the opening moves of a chronologically ordered set of chess games using an extensive chess database. We used two mapping rules to build discrete time series and analyzed them using two methods for detecting long-range correlations; rescaled range analysis and detrended fluctuation analysis. We found that long-range memory is related to the level of the players. When the database is filtered according to player levels we found differences in the persistence of the different subsets. For high level players, correlations are stronger at long time scales; whereas in intermediate and low level players they reach the maximum value at shorter time scales. This can be interpreted as a signature of the different strategies used by players with different levels of expertise. These results are robust against the assignation rules and the method employed in the analysis of the time series.

  6. Assessment of the long-term safety for SFR

    Energy Technology Data Exchange (ETDEWEB)

    Greis Dahlberg, Christina; Vahlund, Frederik [Svensk Kaernbraenslehantering AB, Stockholm (Sweden)

    2015-07-01

    During operation and decommissioning of the Swedish nuclear facilities, radioactive waste is generated that must be disposed of. Besides waste from the nuclear facilities, some waste derives from other activities such as industry, research, medical care, etc. Short-lived low- and intermediate-level waste from these activities is disposed of in the final repository for short-lived radioactive waste, SFR, in Forsmark. The facility, which has been in operation since 1988, is owned and operated by Svensk Karnbranslehantering AB, SKB. The existing facility has neither sufficient space nor a license to receive decommissioning waste. SFR must therefore be extended so that shortlived low- and intermediate-level decommissioning waste from the nuclear facilities can also be received. The need for additional capacity has been accentuated by the closure of two reactors in Barseback. These reactors cannot be dismantled until the SFR facility has been extended. The existing repository is built to receive, and after closure serve as a passive repository for, low- and intermediate-level radioactive waste. The disposal rooms are situated in the bedrock beneath the sea floor, covered by about 60 metres of rock. The repository has been designed so that it can be abandoned after closure without requiring further measures to maintain its function. The extension of SFR, is done at the -120 m level immediately adjacent to, and within the same depth range as, the existing facility. The basic function of the existing SFR and of the extended one will be the same. However, a clear difference is the design of the tunnel and the rock vault that are required to permit transport and storage of whole reactor pressure vessels. The application for a license to build this extension includes an assessment of the long-term safety (post-closure safety) of the facility. The safety assessment also contains an updated assessment of the long-term safety of the existing facility. The safety assessment for

  7. Planning and evaluation of plant under safety aspects

    International Nuclear Information System (INIS)

    Strnad, H.

    1985-01-01

    Plant denotes a technical product characterized as being structured, complex, comprising the use of energy, and that of measuring, automatic control and monitoring systems to keep track of present, control and monitor processes. Particular attention is paid to methods of developing plant concepts, measures to exclude or detect risks, integration of safety engineering into the course of planning, safety concept and ergonomics in plant design. (DG) [de

  8. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  9. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant (PFP); FINAL

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  10. Nordic nuclear safety research. Summary report for 1995. Plans for 1996 and 1997

    International Nuclear Information System (INIS)

    1996-04-01

    NKS (Nordic Nuclear Safety Research) is a cooperative body in nuclear safety and radiation protection. Its purpose is to carry out cost-effective Nordic projects, thus producing research results, exercises, information, recommendations, manuals and other types of background material, to be used by decision makers and other concerned staff members at authorities and within the nuclear industry. This is the annual report for 1995. The report also contains plans for the rest of the program period. The program comprises four major fields of research: reactor safety; radioactive waste; radioecology; and emergency preparedness. Finland and Sweden presently operate a total of 16 power producing reactors. Denmark, Norway and Sweden operate research reactors. There is a plant for nuclear fuel manufacture in Sweden. All five Nordic countries have intermediate waste storage facilities. In addition, there are a number of power, research and naval reactors and other nuclear installations in Nordic surroundings, both in Eastern and Western Europe. Hence, nuclear safety, radiation protection, waste management, environmental impact and emergency preparedness issues are of common interest to all Nordic countries. Environmental impact of radioactive releases is studied in two radioecology projects. The project on marine radioecology, including sediment research (EKO-1), includes sampling, analysis and modeling. These are also key issues in the project on long ecological half-lives in semi-natural systems (EKO-2). The transfer of the seven presently ongoing projects are summarized in this report by the project leaders, both in terms of results in 1995 and plans for 1996/97. (EG)

  11. Facility Effluent Monitoring Plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  12. Long-range corrected DFT calculations of charge-transfer integrals in model metal-free phthalocyanine complexes

    Czech Academy of Sciences Publication Activity Database

    Mikolajczyk, M. M.; Zalesny, R.; Czyznikowska, Z.; Toman, Petr; Leszczynski, J.; Bartkowiak, W.

    2011-01-01

    Roč. 17, č. 9 (2011), s. 2143-2149 ISSN 1610-2940 R&D Projects: GA ČR(CZ) GAP205/10/2280; GA MŠk MEB051010 Institutional research plan: CEZ:AV0Z40500505 Keywords : charge-transfer integral * density functional theory * long-range corrected functionals Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 1.797, year: 2011

  13. Resources and Long-Range Forecasts

    Science.gov (United States)

    Smith, Waldo E.

    1973-01-01

    The author argues that forecasts of quick depletion of resources in the environment as a result of overpopulation and increased usage may not be free from error. Ignorance still exists in understanding the recovery mechanisms of nature. Long-range forecasts are likely to be wrong in such situations. (PS)

  14. Long-term surveillance plan for the Maybell, Colorado Disposal Site

    International Nuclear Information System (INIS)

    1997-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  15. Safety assessment of outdoor live fire range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-05-01

    The following Safety Assessment (SA) pertains to the outdoor live fire range facility (LFR). The purpose of this facility is to supplement the indoor LFR. In particular it provides capacity for exercises that would be inappropriate on the indoor range. This SA examines the risks that are attendant to the training on the outdoor LFR. The outdoor LFR used by EG&G Mound is privately owned. It is identified as the Miami Valley Shooting Grounds. Mondays are leased for the exclusive use of EG&G Mound.

  16. Samish Indian Nation Long-Term Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  17. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  18. Present state and long term planning on nuclear power plants in principal countries in the world

    International Nuclear Information System (INIS)

    Nomura, Junichi

    1978-01-01

    The situation of nuclear power stations and the long term planning in each major country in the world were summarized, but the situation is changing from time to time, therefore it is difficult to make the long term prediction. The advanced countries in terms of nuclear power established the long term plans to adopt nuclear power generation largely owing to the oil crisis, but thereafter the revision was carried out again and again in respective countries. The developing countries already started the operation of nuclear power generation occupy only 2 to 3% of the total installed capacity in the world, but the countries constructing or planning nuclear power generation are many, and if the operation will be started as scheduled, their capacity will reach 30 million kW by 1985, and occupy about 10% of the total installed capacity of nuclear power generation in the world. As for the range of investigation of this report, the countries where the long term plans are unknown or the number of construction is small, Japan, Great Britain, USA and communist countries are excluded. As a rule, the light water reactors with power output of more than 200,000 kW are listed. The number of nuclear power plants in operation, under construction and in planning stage, national situation, long term plan, and others in each country are described. (Kako, I.)

  19. Long-range contributions to double beta decay revisited

    Energy Technology Data Exchange (ETDEWEB)

    Helo, J.C. [Universidad Técnica Federico Santa María, Centro-Científico-Tecnológico de Valparaíso,Casilla 110-V, Valparaíso (Chile); Departamento de Física, Facultad de Ciencias, Universidad de La Serena, Avenida Cisternas 1200, La Serena (Chile); Hirsch, M. [HEP Group, Instituto de Física Corpuscular,C.S.I.C./Universitat de València Edificio Institutos de Investigacion,Parc Cientific de Paterna, Apartado 22085, E-46071 València (Spain); Ota, T. [Department of Physics, Saitama University,Shimo-Okubo 255, 338-8570 Saitama-Sakura (Japan)

    2016-06-01

    We discuss the systematic decomposition of all dimension-7 (d=7) lepton number violating operators. These d=7 operators produce momentum enhanced contributions to the long-range part of the 0νββ decay amplitude and thus are severely constrained by existing half-live limits. In our list of possible models one can find contributions to the long-range amplitude discussed previously in the literature, such as the left-right symmetric model or scalar leptoquarks, as well as some new models not considered before. The d=7 operators generate Majorana neutrino mass terms either at tree-level, 1-loop or 2-loop level. We systematically compare constraints derived from the mass mechanism to those derived from the long-range 0νββ decay amplitude and classify our list of models accordingly. We also study one particular example decomposition, which produces neutrino masses at 2-loop level, can fit oscillation data and yields a large contribution to the long-range 0νββ decay amplitude, in some detail.

  20. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  1. 77 FR 58488 - Hawaii State Plan for Occupational Safety and Health

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health AGENCY: Occupational... announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State...

  2. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  3. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  4. 33 CFR 165.151 - Safety Zones; Long Island Sound annual fireworks displays.

    Science.gov (United States)

    2010-07-01

    ... annual fireworks displays. 165.151 Section 165.151 Navigation and Navigable Waters COAST GUARD... § 165.151 Safety Zones; Long Island Sound annual fireworks displays. (a) Safety Zones. The following...) Indian Harbor Yacht Club Fireworks Safety Zone. All waters of Long Island Sound off Greenwich CT, within...

  5. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  6. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  7. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    DAVIS, W.E.

    2000-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years

  8. Report of the subpanel on long-range planning for the US High-Energy-Physics Program of the High-Energy-Physics Advisory Panel

    International Nuclear Information System (INIS)

    1982-01-01

    The US High Energy Program remains strong, but it faces vigorous competition from other regions of the world. To maintain its vitality and preeminence over the next decade it requires the following major ingredients: (1) strong exploitation of existing facilities; (2) the expeditious completion of construction projects which will expand these facilities over the next few years; (3) the construction of a substantial new facility to be ready for research by the end of the 1980's; and (4) the vigorous pursuit of a wide range of advanced accelerator R and D programs in preparation for the design and construction of a higher energy accelerator which would probably be initiated near the end of this decade. The Subpanel has considered how best to accomplish these goals under two different budgetary assumptions; namely, average yearly support levels of $440M DOE, $35M NSF, and $395M DOE, $34M NSF (FY 1982 dollars). It has also considered the impact of a yet lower support level of $360M DOE and $32M NSF. A description of facilities in high energy physics is given, and facility recommendations and long range plans are discussed. Recommendations for international collaboration are included

  9. Facility effluent monitoring plan for the B plant

    International Nuclear Information System (INIS)

    Lesser, J.E.

    1994-09-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plant assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated every three years

  10. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  11. A review on the long-range strategy of nuclear power development

    International Nuclear Information System (INIS)

    An, Shigehiro; Kondo, Shunsuke; Ishida, Hiroshi.

    1979-01-01

    Nuclear power generation in Japan is proceeding steadily, such as the world's second in power generating capacity and the nation's own development of power reactors. Meanwhile, however, there are number of problems for future solution, like the establishment of nuclear fuel cycle, before nuclear energy is fully harnessed. Looking as far ahead as the 21st century, the long-range strategy of nuclear power development is reviewed: politics on uranium supply outlook, a compromise between uranium enrichment and nuclear nonproliferation, LWR technology with safety, FBR development scheme, uranium resources saving and heavy water reactor, HTGR development, a 2nd fuel reprocessing plant, high level wastes management, reactors decommissioning, research in nuclear energy development, and fostering of a nuclear power industry. (J.P.N.)

  12. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.

  13. Progress of nuclear safety research. 2001

    Energy Technology Data Exchange (ETDEWEB)

    Anoda, Yoshinari; Sasajima, Hideo; Nishiyama, Yutaka (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-10-01

    JAERI is conducting nuclear safety research primarily at the Nuclear Safety Research Center in close cooperation with the related departments in accordance with the Long Term Plan for Development and Utilization of Nuclear Energy or the Safety Research Annual Plan issued by the Japanese government. The safety research at JAERI concerns the engineering safety of nuclear power plants and nuclear fuel cycle facilities, and radioactive waste management as well as advanced technology for safety improvement or assessment. Also, JAERI has conducted international collaboration to share the information on common global issues of nuclear safety. This report summarizes the nuclear safety research activities of JAERI from April 1999 through March 2001. (author)

  14. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  15. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  16. Facility effluent monitoring plan for the plutonium uranium extraction facility

    International Nuclear Information System (INIS)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  17. Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility

    International Nuclear Information System (INIS)

    Greager, E.M.

    1997-01-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years

  18. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  19. Long-range correlations from colour confinement

    International Nuclear Information System (INIS)

    Jurkiewicz, J.; Zenczykowski, P.

    1979-01-01

    A class of independent parton emission models is generalized by the introduction of the colour degrees of freedom. In the proposed models colour confinement extorts strong long-range forward-backward correlations, the rise of one-particle inclusive distribution and the KNO scaling. It leads to the analytically calculable definite asymptotic predictions for the D/ ratio which depends only on the choice of the colour group. Multiplicity distribution develops a remarkably long tail. (author)

  20. Stochastic processes and long range dependence

    CERN Document Server

    Samorodnitsky, Gennady

    2016-01-01

    This monograph is a gateway for researchers and graduate students to explore the profound, yet subtle, world of long-range dependence (also known as long memory). The text is organized around the probabilistic properties of stationary processes that are important for determining the presence or absence of long memory. The first few chapters serve as an overview of the general theory of stochastic processes which gives the reader sufficient background, language, and models for the subsequent discussion of long memory. The later chapters devoted to long memory begin with an introduction to the subject along with a brief history of its development, followed by a presentation of what is currently the best known approach, applicable to stationary processes with a finite second moment. The book concludes with a chapter devoted to the author’s own, less standard, point of view of long memory as a phase transition, and even includes some novel results. Most of the material in the book has not previously been publis...

  1. Facility effluent monitoring plan for 242-A evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years

  2. Short-range/Long-range Integrated Target (SLIT) for Video Guidance Sensor Rendezvous and Docking

    Science.gov (United States)

    Roe, Fred D. (Inventor); Bryan, Thomas C. (Inventor)

    2009-01-01

    A laser target reflector assembly for mounting upon spacecraft having a long-range reflector array formed from a plurality of unfiltered light reflectors embedded in an array pattern upon a hemispherical reflector disposed upon a mounting plate. The reflector assembly also includes a short-range reflector array positioned upon the mounting body proximate to the long-range reflector array. The short-range reflector array includes three filtered light reflectors positioned upon extensions from the mounting body. The three filtered light reflectors retro-reflect substantially all incident light rays that are transmissive by their monochromatic filters and received by the three filtered light reflectors. In one embodiment the short-range reflector array is embedded within the hemispherical reflector,

  3. Boundary Associated Long Noncoding RNA Mediates Long-Range Chromosomal Interactions.

    Directory of Open Access Journals (Sweden)

    Ifeoma Jane Nwigwe

    Full Text Available CCCTC binding factor (CTCF is involved in organizing chromosomes into mega base-sized, topologically associated domains (TADs along with other factors that define sub-TAD organization. CTCF-Cohesin interactions have been shown to be critical for transcription insulation activity as it stabilizes long-range interactions to promote proper gene expression. Previous studies suggest that heterochromatin boundary activity of CTCF may be independent of Cohesin, and there may be additional mechanisms for defining topological domains. Here, we show that a boundary site we previously identified known as CTCF binding site 5 (CBS5 from the homeotic gene cluster A (HOXA locus exhibits robust promoter activity. This promoter activity from the CBS5 boundary element generates a long noncoding RNA that we designate as boundary associated long noncoding RNA-1 (blncRNA1. Functional characterization of this RNA suggests that the transcript stabilizes long-range interactions at the HOXA locus and promotes proper expression of HOXA genes. Additionally, our functional analysis also shows that this RNA is not needed in the stabilization of CTCF-Cohesin interactions however CTCF-Cohesin interactions are critical in the transcription of blncRNA1. Thus, the CTCF-associated boundary element, CBS5, employs both Cohesin and noncoding RNA to establish and maintain topologically associated domains at the HOXA locus.

  4. Long-range correlation in cosmic microwave background radiation.

    Science.gov (United States)

    Movahed, M Sadegh; Ghasemi, F; Rahvar, Sohrab; Tabar, M Reza Rahimi

    2011-08-01

    We investigate the statistical anisotropy and gaussianity of temperature fluctuations of Cosmic Microwave Background (CMB) radiation data from the Wilkinson Microwave Anisotropy Probe survey, using the Multifractal Detrended Fluctuation Analysis, Rescaled Range, and Scaled Windowed Variance methods. Multifractal Detrended Fluctuation Analysis shows that CMB fluctuations has a long-range correlation function with a multifractal behavior. By comparing the shuffled and surrogate series of CMB data, we conclude that the multifractality nature of the temperature fluctuation of CMB radiation is mainly due to the long-range correlations, and the map is consistent with a gaussian distribution.

  5. School Climate: An Essential Component of a Comprehensive School Safety Plan

    Science.gov (United States)

    Stark, Heidi

    2017-01-01

    The intentional assessment and management of school climate is an essential component of a comprehensive school safety plan. The value of this preventive aspect of school safety is often diminished as schools invest resources in physical security measures as a narrowly focused effort to increase school safety (Addington, 2009). This dissertation…

  6. Long-range order in canary song.

    Science.gov (United States)

    Markowitz, Jeffrey E; Ivie, Elizabeth; Kligler, Laura; Gardner, Timothy J

    2013-01-01

    Bird songs range in form from the simple notes of a Chipping Sparrow to the rich performance of the nightingale. Non-adjacent correlations can be found in the syntax of some birdsongs, indicating that the choice of what to sing next is determined not only by the current syllable, but also by previous syllables sung. Here we examine the song of the domesticated canary, a complex singer whose song consists of syllables, grouped into phrases that are arranged in flexible sequences. Phrases are defined by a fundamental time-scale that is independent of the underlying syllable duration. We show that the ordering of phrases is governed by long-range rules: the choice of what phrase to sing next in a given context depends on the history of the song, and for some syllables, highly specific rules produce correlations in song over timescales of up to ten seconds. The neural basis of these long-range correlations may provide insight into how complex behaviors are assembled from more elementary, stereotyped modules.

  7. The feasibility of long range battery electric cars in New Zealand

    International Nuclear Information System (INIS)

    Duke, Mike; Andrews, Deborah; Anderson, Timothy

    2009-01-01

    New Zealand transport accounts for over 40% of the carbon emissions with private cars accounting for 25%. In the Ministry of Economic Development's recently released 'New Zealand Energy Strategy to 2050', it proposed the wide scale deployment of electric vehicles as a means of reducing carbon emissions from transport. However, New Zealand's lack of public transport infrastructure and its subsequent reliance on private car use for longer journeys could mean that many existing battery electric vehicles (BEVs) will not have the performance to replace conventionally fuelled cars. As such, this paper discusses the potential for BEVs in New Zealand, with particular reference to the development of the University of Waikato's long-range UltraCommuter BEV. It is shown that to achieve a long range at higher speeds, BEVs should be designed specifically rather than retrofitting existing vehicles to electric. Furthermore, the electrical energy supply for a mixed fleet of 2 million BEVs is discussed and conservatively calculated, along with the number of wind turbines to achieve this. The results show that approximately 1350 MW of wind turbines would be needed to supply the mixed fleet of 2 million BEVs, or 54% of the energy produced from NZ's planned and installed wind farms.

  8. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  9. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  10. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  11. Long-term surveillance plan for the Gunnison, Colorado disposal site

    International Nuclear Information System (INIS)

    1996-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  12. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  13. Long-term surveillance plan for the Gunnison, Colorado disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  14. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  15. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  16. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1996-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  17. Long-range interactions in dilute granular systems

    NARCIS (Netherlands)

    Müller, M.K

    2008-01-01

    In this thesis, on purpose, we focussed on the most challenging, longest ranging potentials. We analyzed granular media of low densities obeying 1/r long-range interaction potentials between the granules. Such systems are termed granular gases and differ in their behavior from ordinary gases by

  18. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  19. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  20. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.; Olson, Karl R.; Grether, Donald F.; Clary, Mary M.; Smith, Brian M.; Stevens, David F.; Ross, Loren; Alper, Mark D.; Dairiki, Janis M.; Fong, Pauline L.; Bartholomew, James C.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  1. The uranium industry: long-term planning for short-term competition

    International Nuclear Information System (INIS)

    Vottero, X.; Georges Capus, G.

    2001-01-01

    Long term planning for short term competition Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. Firstly, the risk of investing in new mining projects in western countries is growing because, on the one hand, of very erratic market conditions and, on the other hand, of increasingly lengthy, complex and unpredictable regulatory conditions. Secondly, the supply of other sources of uranium (uranium derived from nuclear weapons, uranium produced in CIS countries, ...) involve other risks, mainly related to politics and commercial restrictions. Consequently, competitive uranium supply requires not only technical competence but also financial strength and good marketing capabilities in order to anticipate long-term market trends, in terms of both demand and supply. It also requires taking into account new parameters such as politics, environment, regulations, etc. Today, a supplier dedicated to the sustainable production of nuclear electricity must manage a broad range of long-term risks inherent to the procurement of uranium. Taking into account all these parameters in a context of short-term, fast-changing market is a great challenge for the future generation. World Uranium Civilian Supply and Demand. (authors)

  2. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  3. Plutonium ocean shipment safety between Europe and Japan

    International Nuclear Information System (INIS)

    Pierce, J.D.; Hohnstreiter, G.F.; McClure, J.D.; Smith, J.D.; Dukart, R.J.; Koski, J.A.; Braithwate, J.W.; Sorenson, N.R.; Yamamoto, K.; Kitamura, T.; Shibata, K.; Ouchi, Y.; Ito, T.

    2004-01-01

    Sandia National Laboratories (SNL) and Japan Nuclear Cycle Development Institute (JNC) have conducted an extensive emergency response planning study of the safety of the sea transport of plutonium for JNC. This study was conducted in response to international concerns about the safety of the marine transport of PuO2 powder that began with the sea transport of plutonium powder from France to Japan in 1992 using a purposebuilt ship. This emergency response planning study addressed four topics to better define the accident environment for long-range sea transport of nuclear materials. The first topic is a probabilistic safety analysis that evaluates the technical issues of transporting plutonium between Europe and Japan. An engine-room fire aboard a purposebuilt ship is evaluated as the second topic to determine the vulnerability and safety margin of radioactive material packaging for plutonium designed to meet International Atomic Energy Agency (IAEA) standards. The third topic is a corrosion study performed for generic plutonium packaging to estimate the time required to breach the containment boundary in the event of submersion in seawater. The final study topic is a worldwide survey of information on high-value cargo salvage capabilities from sunken ships. The primary purpose of this overall emergency response planning study is to describe and analyze the safety of radioactive material transportation operations for the international transportation of radioactive materials by maritime cargo vessels

  4. Plutonium ocean shipment safety between Europe and Japan

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, J D; Hohnstreiter, G F; McClure, J D; Smith, J D; Dukart, R J; Koski, J A; Braithwate, J W; Sorenson, N R [Sandia National Labs., Albuquerque, NM (United States); Yamamoto, K; Kitamura, T; Shibata, K; Ouchi, Y; Ito, T [Japan Nuclear Cycle Development Inst., Tokai-mura (Japan)

    2004-07-01

    Sandia National Laboratories (SNL) and Japan Nuclear Cycle Development Institute (JNC) have conducted an extensive emergency response planning study of the safety of the sea transport of plutonium for JNC. This study was conducted in response to international concerns about the safety of the marine transport of PuO2 powder that began with the sea transport of plutonium powder from France to Japan in 1992 using a purposebuilt ship. This emergency response planning study addressed four topics to better define the accident environment for long-range sea transport of nuclear materials. The first topic is a probabilistic safety analysis that evaluates the technical issues of transporting plutonium between Europe and Japan. An engine-room fire aboard a purposebuilt ship is evaluated as the second topic to determine the vulnerability and safety margin of radioactive material packaging for plutonium designed to meet International Atomic Energy Agency (IAEA) standards. The third topic is a corrosion study performed for generic plutonium packaging to estimate the time required to breach the containment boundary in the event of submersion in seawater. The final study topic is a worldwide survey of information on high-value cargo salvage capabilities from sunken ships. The primary purpose of this overall emergency response planning study is to describe and analyze the safety of radioactive material transportation operations for the international transportation of radioactive materials by maritime cargo vessels.

  5. Properties of short-range and long-range correlation energy density functionals from electron-electron coalescence

    International Nuclear Information System (INIS)

    Gori-Giorgi, Paola; Savin, Andreas

    2006-01-01

    The combination of density-functional theory with other approaches to the many-electron problem through the separation of the electron-electron interaction into a short-range and a long-range contribution is a promising method, which is raising more and more interest in recent years. In this work some properties of the corresponding correlation energy functionals are derived by studying the electron-electron coalescence condition for a modified (long-range-only) interaction. A general relation for the on-top (zero electron-electron distance) pair density is derived, and its usefulness is discussed with some examples. For the special case of the uniform electron gas, a simple parametrization of the on-top pair density for a long-range only interaction is presented and supported by calculations within the ''extended Overhauser model.'' The results of this work can be used to build self-interaction corrected short-range correlation energy functionals

  6. Long-term surveillance plan for the South Clive Disposal Site, Clive, Utah

    International Nuclear Information System (INIS)

    1996-03-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CRF Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the South Clive disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the South Clive site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the South Clive disposal site performs as designed. The program's primary activity is site inspections to identify threats to disposal cell integrity

  7. ENSEMBLE methods to reconcile disparate national long range dispersion forecasts

    DEFF Research Database (Denmark)

    Mikkelsen, Torben; Galmarini, S.; Bianconi, R.

    2003-01-01

    ENSEMBLE is a web-based decision support system for real-time exchange and evaluation of national long-range dispersion forecasts of nuclear releases with cross-boundary consequences. The system is developed with the purpose to reconcile among disparatenational forecasts for long-range dispersion...... emergency and meteorological forecasting centres, which may choose to integrate them directly intooperational emergency information systems, or possibly use them as a basis for future system development.......ENSEMBLE is a web-based decision support system for real-time exchange and evaluation of national long-range dispersion forecasts of nuclear releases with cross-boundary consequences. The system is developed with the purpose to reconcile among disparatenational forecasts for long-range dispersion....... ENSEMBLE addresses the problem of achieving a common coherent strategy across European national emergency management when national long-range dispersion forecasts differ from one another during an accidentalatmospheric release of radioactive material. A series of new decision-making “ENSEMBLE” procedures...

  8. Safety research basic plan of JNC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan Nuclear Cycle Development Institute (JNC) formally succeeded to Power Reactor and Nuclear Fuel Development Corporation (PNC) on October, 1 1998. This report describes the basic plan for major program of JNC which consists of two parts: management philosophy of the new institute and the latest revised medium term program. In the first part, the primary mission of JNC is to perform its R and D concentrating on fast breeder reactor and its fuel cycle, and treatment and disposal of high-level radioactive wastes, while at the same time giving special consideration to safety. In the second, individual programs in the new basic plan are discussed in detail. The outline and schedule of each program are also attached in the table form. (H. Itami)

  9. ENSEMBLE methods to reconcile disparate national long range dispersion forecasts

    OpenAIRE

    Mikkelsen, Torben; Galmarini, S.; Bianconi, R.; French, S.

    2003-01-01

    ENSEMBLE is a web-based decision support system for real-time exchange and evaluation of national long-range dispersion forecasts of nuclear releases with cross-boundary consequences. The system is developed with the purpose to reconcile among disparatenational forecasts for long-range dispersion. ENSEMBLE addresses the problem of achieving a common coherent strategy across European national emergency management when national long-range dispersion forecasts differ from one another during an a...

  10. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  11. Outages 1999 and 2000, investments in safety and long-term operation of NE Krsko

    International Nuclear Information System (INIS)

    Sirola, P.; Krajnc, J.; Androjna, F.

    1999-01-01

    Plant outage is an important part of nuclear power plant operation. During that time the conditions are established for the performance of specific activities, such as refueling, tests, inspections, preventive and corrective maintenance and modifications, that are intended to confirm proper condition and availability of safety and other important components and improve overall plant safety and reliability. It is well know that in Nuclear Power Plant Krsko (Nuklearna elektrarna Krsko NEK) during Outage 2000 new Steam Generators (SGs) will be placed in service, while Outage '99 was used for preparatory works. But the importance of those two outages is even greater, because they are implementing a broad number of improvements and establishing a basis for long-term plant operation. Outage '99 required very detailed planning to assure a good control over the outage activities and operational plant systems necessary for safe shutdown. Numerous activities took place in a relatively narrow space in the Reactor Building. Some of these activities will have a big significance for the future. The article treats the status update and summarizes the specifics and importance of the mentioned activities to long-term plant safe and reliable operation.(author)

  12. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontage, S.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  13. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  14. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  15. Clear Purpose...Complete Commitment: A Long-Range Program To Provide Louisianians with Library and Information Services Adequate to Their Needs, 1993-1997.

    Science.gov (United States)

    Jaques, Thomas F.

    This long range plan, which was prepared in compliance with the Library Services and Construction Act (LSCA), begins with an overview of the library public and the state library agency in Louisiana. Identification of needs and action plans are presented in the following goal areas: (1) improving state library administration; (2) extending services…

  16. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  17. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  18. Laser long-range remote-sensing program experimental results

    Science.gov (United States)

    Highland, Ronald G.; Shilko, Michael L.; Fox, Marsha J.; Gonglewski, John D.; Czyzak, Stanley R.; Dowling, James A.; Kelly, Brian; Pierrottet, Diego F.; Ruffatto, Donald; Loando, Sharon; Matsuura, Chris; Senft, Daniel C.; Finkner, Lyle; Rae, Joe; Gallegos, Joe

    1995-12-01

    A laser long range remote sensing (LRS) program is being conducted by the United States Air Force Phillips Laboratory (AF/PL). As part of this program, AF/PL is testing the feasibility of developing a long path CO(subscript 2) laser-based DIAL system for remote sensing. In support of this program, the AF/PL has recently completed an experimental series using a 21 km slant- range path (3.05 km ASL transceiver height to 0.067 km ASL target height) at its Phillips Laboratory Air Force Maui Optical Station (AMOS) facility located on Maui, Hawaii. The dial system uses a 3-joule, (superscript 13)C isotope laser coupled into a 0.6 m diameter telescope. The atmospheric optical characterization incorporates information from an infrared scintillometer co-aligned to the laser path, atmospheric profiles from weather balloons launched from the target site, and meteorological data from ground stations at AMOS and the target site. In this paper, we report a description of the experiment configuration, a summary of the results, a summary of the atmospheric conditions and their implications to the LRS program. The capability of such a system for long-range, low-angle, slant-path remote sensing is discussed. System performance issues relating to both coherent and incoherent detection methods, atmospheric limitations, as well as, the development of advanced models to predict performance of long range scenarios are presented.

  19. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  20. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  1. Exploring flavor-dependent long-range forces in long-baseline neutrino oscillation experiments

    Science.gov (United States)

    Chatterjee, Sabya Sachi; Dasgupta, Arnab; Agarwalla, Sanjib Kumar

    2015-12-01

    The Standard Model gauge group can be extended with minimal matter content by introducing anomaly free U(1) symmetry, such as L e - L μ or L e - L τ . If the neutral gauge boson corresponding to this abelian symmetry is ultra-light, then it will give rise to flavor-dependent long-range leptonic force, which can have significant impact on neutrino oscillations. For an instance, the electrons inside the Sun can generate a flavor-dependent long-range potential at the Earth surface, which can suppress the ν μ → ν e appearance probability in terrestrial experiments. The sign of this potential is opposite for anti-neutrinos, and affects the oscillations of (anti-)neutrinos in different fashion. This feature invokes fake CP-asymmetry like the SM matter effect and can severely affect the leptonic CP-violation searches in long-baseline experiments. In this paper, we study in detail the possible impacts of these long-range flavor-diagonal neutral current interactions due to L e - L μ symmetry, when (anti-)neutrinos travel from Fermilab to Homestake (1300 km) and CERN to Pyhäsalmi (2290 km) in the context of future high-precision superbeam facilities, DUNE and LBNO respectively. If there is no signal of long-range force, DUNE (LBNO) can place stringent constraint on the effective gauge coupling α eμ < 1.9 × 10-53 (7.8 × 10-54) at 90% C.L., which is almost 30 (70) times better than the existing bound from the Super-Kamiokande experiment. We also observe that if α eμ ≥ 2 × 10-52, the CP-violation discovery reach of these future facilities vanishes completely. The mass hierarchy measurement remains robust in DUNE (LBNO) if α eμ < 5 × 10-52 (10-52).

  2. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  3. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  4. The Safety Assessment of Long term Interim Storage at Sellafield

    International Nuclear Information System (INIS)

    Buchan, Andrew B.

    2014-01-01

    that are most significant in terms of frequency and unmitigated potential consequences PSA looks at the full range of fault sequences and allows full incorporation of the reliability and failure probability of the safety measures and other features of the design and operations SAA considers significant but unlikely accidents where off-site consequences are likely to significantly affect the critical group and provides information on their progression, within the facility and also beyond the site boundary. The paper will illustrate how these techniques have been utilised to facilitate design, operation, resilience evaluation and accident management of facilities supporting long term interim storage at Sellafield. (author)

  5. A novel respiratory motion compensation strategy combining gated beam delivery and mean target position concept - A compromise between small safety margins and long duty cycles

    International Nuclear Information System (INIS)

    Guckenberger, Matthias; Kavanagh, Anthony; Webb, Steve; Brada, Michael

    2011-01-01

    Purpose: To evaluate a novel respiratory motion compensation strategy combining gated beam delivery with the mean target position (MTP) concept for pulmonary stereotactic body radiotherapy (SBRT). Materials and methods: Four motion compensation strategies were compared for 10 targets with motion amplitudes between 6 mm and 31 mm: the internal target volume concept (plan ITV ); the MTP concept where safety margins were adapted based on 4D dose accumulation (plan MTP ); gated beam delivery without margins for motion compensation (plan gated ); a novel approach combining gating and the MTP concept (plan gated and MTP ). Results: For 5/10 targets with an average motion amplitude of 9 mm, the differences in the mean lung dose (MLD) between plan gated and plan MTP were gated and MTP . Despite significantly shorter duty cycles, plan gated reduced the MLD by gated and MTP . The MLD was increased by 18% in plan MTP compared to that of plan gated and MTP . Conclusions: For pulmonary targets with motion amplitudes >10-15 mm, the combination of gating and the MTP concept allowed small safety margins with simultaneous long duty cycles.

  6. Long-Range Piping Inspection by Ultrasonic Guided Waves

    International Nuclear Information System (INIS)

    Joo, Young Sang; Lim, Sa Hoe; Eom, Heung Seop; Kim, Jae Hee

    2005-01-01

    The ultrasonic guided waves are very promising for the long-range inspection of large structures because they can propagate a long distance along the structures such as plates, shells and pipes. The guided wave inspection could be utilized for an on-line monitoring technique when the transmitting and receiving transducers are positioned at a remote point on the structure. The received signal has the information about the integrity of the monitoring area between the transmitting and receiving transducers. On-line monitoring of a pipe line using an ultrasonic guided wave can detect flaws such as corrosion, erosion and fatigue cracking at an early stage and collect useful information on the flaws. However the guided wave inspection is complicated by the dispersive characteristics for guided waves. The phase and group velocities are a function of the frequency-thickness product. Therefore, the different frequency components of the guided waves will travel at different speeds and the shape of the received signal will changed as it propagates along the pipe. In this study, we analyze the propagation characteristics of guided wave modes in a small diameter pipe of nuclear power plant and select the suitable mode for a long-range inspection. And experiments will be carried out for the practical application of a long-range inspection in a 26m long pipe by using a high-power ultrasonic inspection system

  7. Long-range beam-beam experiments in the relativistic heavy ion collider

    International Nuclear Information System (INIS)

    Calaga, R; Fischer, W; Milas, N; Robert-Demolaize, G

    2014-01-01

    Long-range beam-beam effects are a potential limit to the LHC performance with the nominal design parameters, and certain upgrade scenarios under discussion. To mitigate long-range effects, current carrying wires parallel to the beam were proposed and space is reserved in the LHC for such wires. Two current carrying wires were installed in RHIC to study the effect of strong long-range beam-beam effects in a collider, as well as test the compensation of a single long-range interaction. The experimental data were used to benchmark simulations. We summarize this work

  8. Long range supergravity coupling strengths

    International Nuclear Information System (INIS)

    Kenyon, I.R.

    1991-01-01

    A limit of 2x10 -13 has recently been deduced for the fractional difference between the gravitational masses of the K 0 and anti K 0 mesons. This limit is applied here to put stringent limits on the strengths of the long range vector-scalar gravitational couplings envisaged in supergravity theories. A weaker limit is inferred from the general relativistic fit to the precession of the orbit of the pulsar PSR1913+16. (orig.)

  9. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  10. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  11. One-dimensional long-range percolation: A numerical study

    Science.gov (United States)

    Gori, G.; Michelangeli, M.; Defenu, N.; Trombettoni, A.

    2017-07-01

    In this paper we study bond percolation on a one-dimensional chain with power-law bond probability C /rd +σ , where r is the distance length between distinct sites and d =1 . We introduce and test an order-N Monte Carlo algorithm and we determine as a function of σ the critical value Cc at which percolation occurs. The critical exponents in the range 0 values for Cc are compared with a known exact bound, while the critical exponent ν is compared with results from mean-field theory, from an expansion around the point σ =1 and from the ɛ -expansion used with the introduction of a suitably defined effective dimension deff relating the long-range model with a short-range one in dimension deff. We finally present a formulation of our algorithm for bond percolation on general graphs, with order N efficiency on a large class of graphs including short-range percolation and translationally invariant long-range models in any spatial dimension d with σ >0 .

  12. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  13. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  14. Fast long-range connections in transportation networks

    International Nuclear Information System (INIS)

    Palhares Viana, Matheus; Fontoura Costa, Luciano da

    2011-01-01

    Multidimensional scaling is applied in order to visualize an analogue of the small-world effect implied by edges having different displacement velocities in transportation networks. Our findings are illustrated for two real-world systems, namely the London urban network (streets and underground) and the US highway network enhanced by some of the main US airlines routes. We also show that the travel time in these two networks is drastically changed by attacks targeting the edges with large displacement velocities. - Highlights: → Multidimensional scaling used to visualize the effects of fast long-range connections. → Fast long-range connections are important to decrease the average travel time. → The average travel time diverges quickly when the network is under target attacks.

  15. Safety Aspects of Long Term Spent Fuel Dry Storage

    International Nuclear Information System (INIS)

    Botsch, Wolfgang; Smalian, S.; Hinterding, P.; Drotleff, H.; Voelzke, H.; Wolff, D.; Kasparek, E.

    2014-01-01

    As a consequence of the lack of a final repository for spent nuclear fuel (SF) and high level waste (HLW), long term interim storage of SF and HLW will be necessary. As with the storage of all radioactive materials, the long term storage of SF and HLW must conform to safety requirements. Safety aspects such as safe enclosure of radioactive materials, safe removal of decay heat, sub-criticality and avoidance of unnecessary radiation exposure must be achieved throughout the complete storage period. The implementation of these safety requirements can be achieved by dry storage of SF and HLW in casks as well as in other systems such as dry vault storage systems or spent fuel pools, where the latter is neither a dry nor a passive system. After the events of Fukushima, the advantages of passively and inherently safe dry storage systems have become more obvious. In Germany, dry storage of SF in casks fulfils both transport and storage requirements. Mostly, storage facilities are designed as concrete buildings above the ground; one storage facility has also been built as a rock tunnel. In all these facilities the safe enclosure of radioactive materials in dry storage casks is achieved by a double-lid sealing system with surveillance of the sealing system. The safe removal of decay heat is ensured by the design of the storage containers and the storage facility, which also secures to reduce the radiation exposure to acceptable levels. TUV and BAM, who work as independent experts for the competent authorities, inform about spent fuel management and issues concerning dry storage of spent nuclear fuel, based on their long experience in these fields. All relevant safety issues such as safe enclosure, shielding, removal of decay heat and sub-criticality are checked and validated with state-of-the-art methods and computer codes before the license approval. In our presentation we discuss which of these aspects need to be examined closer for a long term interim storage. It is shown

  16. Long-range interactions among three alkali-metal atoms

    International Nuclear Information System (INIS)

    Marinescu, M.; Starace, A.F.

    1996-01-01

    The long-range asymptotic form of the interaction potential surface for three neutral alkali-metal atoms in their ground states may be expressed as an expansion in inverse powers of inter-nuclear distances. The first leading powers are proportional to the dispersion coefficients for pairwise atomic interactions. They are followed by a term responsible for a three body dipole interaction. The authors results consist in evaluation of the three body dipole interaction coefficient between three alkali-metal atoms. The generalization to long-range n atom interaction terms will be discussed qualitatively

  17. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Erhart, Steven C. [National Nuclear Security Administration (NNSA), Washington, DC (United States); Spencer, Charles G. [Y-12 National Security Complex, Oak Ridge, TN (United States)

    2013-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  18. Long-Range Coulomb Effect in Intense Laser-Driven Photoelectron Dynamics.

    Science.gov (United States)

    Quan, Wei; Hao, XiaoLei; Chen, YongJu; Yu, ShaoGang; Xu, SongPo; Wang, YanLan; Sun, RenPing; Lai, XuanYang; Wu, ChengYin; Gong, QiHuang; He, XianTu; Liu, XiaoJun; Chen, Jing

    2016-06-03

    In strong field atomic physics community, long-range Coulomb interaction has for a long time been overlooked and its significant role in intense laser-driven photoelectron dynamics eluded experimental observations. Here we report an experimental investigation of the effect of long-range Coulomb potential on the dynamics of near-zero-momentum photoelectrons produced in photo-ionization process of noble gas atoms in intense midinfrared laser pulses. By exploring the dependence of photoelectron distributions near zero momentum on laser intensity and wavelength, we unambiguously demonstrate that the long-range tail of the Coulomb potential (i.e., up to several hundreds atomic units) plays an important role in determining the photoelectron dynamics after the pulse ends.

  19. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  20. Long-range interaction between spins

    International Nuclear Information System (INIS)

    Naik, P.C.; Pradhan, T.

    1981-01-01

    It is shown that invariance of Lagrangian field theory under a class of the coordinate-dependent Lorentz group of transformations requires the introduction of a massless axial vector gauge field which gives rise to a super-weak long-range spin-spin force between particles in vacuum. Recent experiments demonstrating repulsion and attraction between circularly polarised laser beams are interpreted to be due to such a force enhanced by spin polarisation of sodium vapour, through which these beams pass. (author)

  1. Safety and performance indicators for the assessment of long-term safety of deep geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    Hugi, M.; Schneider, J.W.; Dorp, F. van; Zuidema, P.

    2005-01-01

    The evaluation of the ability to isolate radioactive waste and the assessment of the long-term safety of a deep geological repository is usually done in terms of the calculated dose and/or risk for an average individual of the population which is potentially most affected by the potential impacts of the repository. At present, various countries and international organisations are developing so-called complementary indicators to supplement such calculations. These indicators are called ''safety indicators'' if they refer to the safety of the whole repository system; if they address the isolation capability of individual system components or the whole system from a more technical perspective, they are called ''performance indicators''. The need for complementary indicators follows from the long time frames which characterise the safety assessment of a geological repository, and the corresponding uncertainty of the calculated radiation dose. The main reason for these uncertainties is associated with the uncertain long-term prognosis of the surface environment and the related human behaviour. (orig.)

  2. GEOSAF Part II. Demonstration of the operational and long-term safety of geological disposal facilities for radioactive waste. IAEA international intercomparison and harmonization project

    Energy Technology Data Exchange (ETDEWEB)

    Kumano, Yumiko; Bruno, Gerard [International Atomic Energy Agency, Vienna (Austria). Vienna International Centre; Tichauer, Michael [IRSN, Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France); Hedberg, Bengt [Swedish Radiation Safety Authority, Stockholm (Sweden)

    2015-07-01

    International intercomparison and harmonization projects are one of the mechanisms developed by the IAEA for examining the application and use of safety standards, with a view to ensuring their effectiveness and working towards harmonization of approaches to the safety of radioactive waste management. The IAEA has organized a number of international projects on the safety of radioactive waste management; in particular on the issues related to safety demonstration for radioactive waste management facilities. In 2008, GEOSAF, Demonstration of The Operational and Long-Term Safety of Geological Disposal Facilities for Radioactive Waste, project was initiated. This project was completed in 2011 by delivering a project report focusing on the safety case for geological disposal facilities, a concept that has gained in recent years considerable prominence in the waste management area and is addressed in several international safety standards. During the course of the project, it was recognized that little work was undertaken internationally to develop a common view on the safety approach related to the operational phase of a geological disposal although long-term safety of disposal facility has been discussed for several decades. Upon completion of the first part of the GEOSAF project, it was decided to commence a follow-up project aiming at harmonizing approaches on the safety of geological disposal facilities for radioactive waste through the development of an integrated safety case covering both operational and long-term safety. The new project was named as GEOSAF Part II, which was initiated in 2012 initially as 2-year project, involving regulators and operators. GEOSAF Part II provides a forum to exchange ideas and experience on the development and review of an integrated operational and post-closure safety case for geological disposal facilities. It also aims at providing a platform for knowledge transfer. The project is of particular interest to regulatory

  3. A Process for Planning.

    Science.gov (United States)

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  4. Long-Range Nondestructive Testing System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal is for the development of a long range, multi-point non-destructive system for the detection of subsurface flaws in metallic and composite materials of...

  5. Travel: a long-range goal of retired women.

    Science.gov (United States)

    Staats, Sara; Pierfelice, Loretta

    2003-09-01

    The authors surveyed retired persons (predominately women) with regard to their immediate, intermediate, and long-range activities following retirement. As predicted, leisure travel emerged as a frequent long-range goal for persons retired more than 5 years. The travel activity preferences of long-retired older women present challenges and opportunities to both researchers and marketers. Length of trips and frequency of trips have been predicted from regression models, with trip length in particular being well predicted by the problem of daily life hassles. A theoretical model of continued post-retirement travel is presented as a variant of Solomon's opponent process theory of affect (R. L. Solomon, 1980). The authors suggest that to the degree that places traveled to are varied and different, older people may remain stimulated and continue to enjoy retirement.

  6. UTag: Long-range Ultra-wideband Passive Radio Frequency Tags

    Energy Technology Data Exchange (ETDEWEB)

    Dowla, F

    2007-03-14

    Long-range, ultra-wideband (UWB), passive radio frequency (RF) tags are key components in Radio Frequency IDentification (RFID) system that will revolutionize inventory control and tracking applications. Unlike conventional, battery-operated (active) RFID tags, LLNL's small UWB tags, called 'UTag', operate at long range (up to 20 meters) in harsh, cluttered environments. Because they are battery-less (that is, passive), they have practically infinite lifetimes without human intervention, and they are lower in cost to manufacture and maintain than active RFID tags. These robust, energy-efficient passive tags are remotely powered by UWB radio signals, which are much more difficult to detect, intercept, and jam than conventional narrowband frequencies. The features of long range, battery-less, and low cost give UTag significant advantage over other existing RFID tags.

  7. Relationships Between Long-Range Lightning Networks and TRMM/LIS Observations

    Science.gov (United States)

    Rudlosky, Scott D.; Holzworth, Robert H.; Carey, Lawrence D.; Schultz, Chris J.; Bateman, Monte; Cummins, Kenneth L.; Cummins, Kenneth L.; Blakeslee, Richard J.; Goodman, Steven J.

    2012-01-01

    Recent advances in long-range lightning detection technologies have improved our understanding of thunderstorm evolution in the data sparse oceanic regions. Although the expansion and improvement of long-range lightning datasets have increased their applicability, these applications (e.g., data assimilation, atmospheric chemistry, and aviation weather hazards) require knowledge of the network detection capabilities. The present study intercompares long-range lightning data with observations from the Lightning Imaging Sensor (LIS) aboard the Tropical Rainfall Measurement Mission (TRMM) satellite. The study examines network detection efficiency and location accuracy relative to LIS observations, describes spatial variability in these performance metrics, and documents the characteristics of LIS flashes that are detected by the long-range networks. Improved knowledge of relationships between these datasets will allow researchers, algorithm developers, and operational users to better prepare for the spatial and temporal coverage of the upcoming GOES-R Geostationary Lightning Mapper (GLM).

  8. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  9. 76 FR 55056 - Toy Safety Standard: Strategic Outreach and Education Plan

    Science.gov (United States)

    2011-09-06

    ... to test and certify to the toy safety standard. We plan to use traditional and social media to... testing and certification requirements for children's toys and toy chests and their compliance with ASTM... manufacturers of children's toys must ensure that covered toys are tested for compliance with the toy safety...

  10. 12 CFR 263.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... member bank will take to correct the deficiency and the time within which those steps will be taken. (c... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Submission and Review of Safety and Soundness... safety and soundness compliance plan. (a) Schedule for filing compliance plan—(1) In general. A State...

  11. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  12. Force induced unzipping of DNA with long range correlated noise

    International Nuclear Information System (INIS)

    Lam, Pui-Man; Zhen, Yi

    2011-01-01

    We derive and solve a Fokker–Planck equation for the stationary distribution of the free energy, in a model of unzipping of double-stranded DNA under external force. The autocorrelation function of the random DNA sequence can be of a general form, including long range correlations. In the case of Ornstein–Uhlenbeck noise, characterized by a finite correlation length, our result reduces to the exact result of Allahverdyan et al, with the average number of unzipped base pairs going as (X) ∼ 1/f 2 in the white noise limit, where f is the deviation from the critical force. In the case of long range correlated noise, where the integrated autocorrelation is divergent, we find that (X) is finite at f = 0, with its value decreasing as the correlations become of longer range. This shows that long range correlations actually stabilize the DNA sequence against unzipping. Our result is also in agreement with the findings of Allahverdyan et al obtained using numerical generation of the long range correlated noise

  13. Long-range-corrected Rung 3.5 density functional approximations

    Science.gov (United States)

    Janesko, Benjamin G.; Proynov, Emil; Scalmani, Giovanni; Frisch, Michael J.

    2018-03-01

    Rung 3.5 functionals are a new class of approximations for density functional theory. They provide a flexible intermediate between exact (Hartree-Fock, HF) exchange and semilocal approximations for exchange. Existing Rung 3.5 functionals inherit semilocal functionals' limitations in atomic cores and density tails. Here we address those limitations using range-separated admixture of HF exchange. We present three new functionals. LRC-ωΠLDA combines long-range HF exchange with short-range Rung 3.5 ΠLDA exchange. SLC-ΠLDA combines short- and long-range HF exchange with middle-range ΠLDA exchange. LRC-ωΠLDA-AC incorporates a combination of HF, semilocal, and Rung 3.5 exchange in the short range, based on an adiabatic connection. We test these in a new Rung 3.5 implementation including up to analytic fourth derivatives. LRC-ωΠLDA and SLC-ΠLDA improve atomization energies and reaction barriers by a factor of 8 compared to the full-range ΠLDA. LRC-ωΠLDA-AC brings further improvement approaching the accuracy of standard long-range corrected schemes LC-ωPBE and SLC-PBE. The new functionals yield highest occupied orbital energies closer to experimental ionization potentials and describe correctly the weak charge-transfer complex of ethylene and dichlorine and the hole-spin distribution created by an Al defect in quartz. This study provides a framework for more flexible range-separated Rung 3.5 approximations.

  14. A tailored online safety and health intervention for women experiencing intimate partner violence: the iCAN Plan 4 Safety randomized controlled trial protocol

    Directory of Open Access Journals (Sweden)

    Marilyn Ford-Gilboe

    2017-03-01

    Full Text Available Abstract Background Intimate partner violence (IPV threatens the safety and health of women worldwide. Safety planning is a widely recommended, evidence-based intervention for women experiencing IPV, yet fewer than 1 in 5 Canadian women access safety planning through domestic violence services. Rural, Indigenous, racialized, and immigrant women, those who prioritize their privacy, and/or women who have partners other than men, face unique safety risks and access barriers. Online IPV interventions tailored to the unique features of women’s lives, and to maximize choice and control, have potential to reduce access barriers, and improve fit and inclusiveness, maximizing effectiveness of these interventions for diverse groups. Methods/Design In this double blind randomized controlled trial, 450 Canadian women who have experienced IPV in the previous 6 months will be randomized to either a tailored, interactive online safety and health intervention (iCAN Plan 4 Safety or general online safety information (usual care. iCAN engages women in activities designed to increase their awareness of safety risks, reflect on their plans for their relationships and priorities, and create a personalize action plan of strategies and resources for addressing their safety and health concerns. Self-reported outcome measures will be collected at baseline and 3, 6, and 12 months post-baseline. Primary outcomes are depressive symptoms (Center for Epidemiological Studies Depression Scale, Revised and PTSD Symptoms (PTSD Checklist, Civilian Version. Secondary outcomes include helpful safety actions, safety planning self-efficacy, mastery, and decisional conflict. In-depth qualitative interviews with approximately 60 women who have completed the trial and website utilization data will be used to explore women’s engagement with the intervention and processes of change. Discussion This trial will contribute timely evidence about the effectiveness of online safety and

  15. Long-term care: a substantive factor in financial planning.

    Science.gov (United States)

    Willis, D A

    2000-01-01

    More than 50 percent of women will enter a nursing home at some point in their lives. About one-third of men living to age 65 will also need nursing home care. Planning for long-term care is even more important since Medicare covers very little of the cost of such care. The Indiana Partnership Plan is one program designed to help fund the long-term care costs while allowing individuals protect other financial assets.

  16. Facility Effluent Monitoring Plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Carter, G.J.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updates as a minimum every three years

  17. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    International Nuclear Information System (INIS)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.; Thieme, R.E.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a ''transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as ''buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containing mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs

  18. Long-range terms in atomic collisions

    International Nuclear Information System (INIS)

    McGuire, J.H.; Weaver, O.L.

    1986-01-01

    Various separations, or ''gauge choices,'' are possible for the decomposition of the total Hamiltonian into electronic and internuclear terms. We show that, for one particular choice, all long-range Coulomb terms are associated with the internuclear motion. The potential then associated with electronic transitions is non-Coulombic. Some practical consequences of this gauge choice are discussed

  19. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, Charles G

    2012-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.

  20. Conformal invariance in the long-range Ising model

    Directory of Open Access Journals (Sweden)

    Miguel F. Paulos

    2016-01-01

    Full Text Available We consider the question of conformal invariance of the long-range Ising model at the critical point. The continuum description is given in terms of a nonlocal field theory, and the absence of a stress tensor invalidates all of the standard arguments for the enhancement of scale invariance to conformal invariance. We however show that several correlation functions, computed to second order in the epsilon expansion, are nontrivially consistent with conformal invariance. We proceed to give a proof of conformal invariance to all orders in the epsilon expansion, based on the description of the long-range Ising model as a defect theory in an auxiliary higher-dimensional space. A detailed review of conformal invariance in the d-dimensional short-range Ising model is also included and may be of independent interest.

  1. Conformal Invariance in the Long-Range Ising Model

    CERN Document Server

    Paulos, Miguel F; van Rees, Balt C; Zan, Bernardo

    2016-01-01

    We consider the question of conformal invariance of the long-range Ising model at the critical point. The continuum description is given in terms of a nonlocal field theory, and the absence of a stress tensor invalidates all of the standard arguments for the enhancement of scale invariance to conformal invariance. We however show that several correlation functions, computed to second order in the epsilon expansion, are nontrivially consistent with conformal invariance. We proceed to give a proof of conformal invariance to all orders in the epsilon expansion, based on the description of the long-range Ising model as a defect theory in an auxiliary higher-dimensional space. A detailed review of conformal invariance in the d-dimensional short-range Ising model is also included and may be of independent interest.

  2. Conformal invariance in the long-range Ising model

    Energy Technology Data Exchange (ETDEWEB)

    Paulos, Miguel F. [CERN, Theory Group, Geneva (Switzerland); Rychkov, Slava, E-mail: slava.rychkov@lpt.ens.fr [CERN, Theory Group, Geneva (Switzerland); Laboratoire de Physique Théorique de l' École Normale Supérieure (LPTENS), Paris (France); Faculté de Physique, Université Pierre et Marie Curie (UPMC), Paris (France); Rees, Balt C. van [CERN, Theory Group, Geneva (Switzerland); Zan, Bernardo [Institute of Physics, Universiteit van Amsterdam, Amsterdam (Netherlands)

    2016-01-15

    We consider the question of conformal invariance of the long-range Ising model at the critical point. The continuum description is given in terms of a nonlocal field theory, and the absence of a stress tensor invalidates all of the standard arguments for the enhancement of scale invariance to conformal invariance. We however show that several correlation functions, computed to second order in the epsilon expansion, are nontrivially consistent with conformal invariance. We proceed to give a proof of conformal invariance to all orders in the epsilon expansion, based on the description of the long-range Ising model as a defect theory in an auxiliary higher-dimensional space. A detailed review of conformal invariance in the d-dimensional short-range Ising model is also included and may be of independent interest.

  3. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  4. Safety evaluation report on Tennessee Valley Authority: Watts Bar Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This safety evaluation report on the information submitted by the Tennessee Valley Authority in its Nuclear Performance Plan for the Watts Bar Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific corrective actions as part of the recovery program for licensing of Unit 1. The staff will be monitoring and inspecting the implementation of the programs. The plan does not address all licensing matters that will be required for fuel load and operation of Unit 1. Those remaining licensing matters have been addressed in previous safety evaluations or will be addressed in accordance with routing NRC licensing practices. 97 refs

  5. The Role of the Government and the Public in the Planning of Long Term Management for Nuclear Fuel Wastes in Canada

    International Nuclear Information System (INIS)

    Diah Hidayanti; Yudi Pramono

    2007-01-01

    The generation of electricity from nuclear power has the consequence of producing some wastes that are radioactive, especially in the form of spent fuels which are classified as high level nuclear wastes. Nuclear fuel wastes must be managed properly in order to protect public and environment from its big potential hazard. One type of long term management for nuclear fuel wastes is the final disposal in a permanent storage. Because of the importance of safety aspects for final disposal, it needs the involvement of government and the public to determine the reliability and the acceptance of final disposal concept. Those involvements can be implemented in some aspects such as regulation aspect, review and assessment process, and the public feedback. The evaluation on the plan of long term management for nuclear fuel wastes in Canada provides Indonesia an overview of its long term management plans for all radioactive materials, including nuclear fuel wastes generated from the nuclear power plant which is planned to be in service by 2016. (author)

  6. Strong asymmetry for surface modes in nonlinear lattices with long-range coupling

    International Nuclear Information System (INIS)

    Martinez, Alejandro J.; Vicencio, Rodrigo A.; Molina, Mario I.

    2010-01-01

    We analyze the formation of localized surface modes on a nonlinear cubic waveguide array in the presence of exponentially decreasing long-range interactions. We find that the long-range coupling induces a strong asymmetry between the focusing and defocusing cases for the topology of the surface modes and also for the minimum power needed to generate them. In particular, for the defocusing case, there is an upper power threshold for exciting staggered modes, which depends strongly on the long-range coupling strength. The power threshold for dynamical excitation of surface modes increases (decreases) with the strength of long-range coupling for the focusing (defocusing) cases. These effects seem to be generic for discrete lattices with long-range interactions.

  7. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  8. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  9. Observed Orbit Effects during Long Range Beam-Beam Studies

    CERN Document Server

    Alemany, R; Buffat, X; Calaga, R; Fitterer, M; Giachino, R; Hemelsoet, GH; Herr, W; Papotti, G; Pieloni, T; Poyer, M; Schaumann, M; Trad, G; Wollmann, D

    2012-01-01

    Possible limitations due to long range beam-beam effects at the LHC have been studied and are presented in this note. With a larger number of bunches and collisions in all interaction points, the crossing angles were reduced to enhance long range beam-beam effects. The analysis of the effects on the dynamic aperture and losses are documented in [1]. This note concentrates on the bunch-by-bunch orbit effects observed during the experiment.

  10. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  11. Imaging using long range dipolar field effects

    International Nuclear Information System (INIS)

    Gutteridge, Sarah

    2002-01-01

    The work in this thesis has been undertaken by the author, except where indicated in reference, within the Magnetic Resonance Centre, at the University of Nottingham during the period from October 1998 to March 2001. This thesis details the different characteristics of the long range dipolar field and its application to magnetic resonance imaging. The long range dipolar field is usually neglected in nuclear magnetic resonance experiments, as molecular tumbling decouples its effect at short distances. However, in highly polarised samples residual long range components have a significant effect on the evolution of the magnetisation, giving rise to multiple spin echoes and unexpected quantum coherences. Three applications utilising these dipolar field effects are documented in this thesis. The first demonstrates the spatial sensitivity of the signal generated via dipolar field effects in structured liquid state samples. The second utilises the signal produced by the dipolar field to create proton spin density maps. These maps directly yield an absolute value for the water content of the sample that is unaffected by relaxation and any RF inhomogeneity or calibration errors in the radio frequency pulses applied. It has also been suggested that the signal generated by dipolar field effects may provide novel contrast in functional magnetic resonance imaging. In the third application, the effects of microscopic susceptibility variation on the signal are studied and the relaxation rate of the signal is compared to that of a conventional spin echo. (author)

  12. Scintillation mitigation for long-range surveillance video

    CSIR Research Space (South Africa)

    Delport, JP

    2010-09-01

    Full Text Available Atmospheric turbulence is a naturally occurring phenomenon that can severely degrade the quality of long-range surveillance video footage. Major effects include image blurring, image warping and temporal wavering of objects in the scene. Mitigating...

  13. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  14. Intergenerational equity and long-term stewardship plans

    International Nuclear Information System (INIS)

    Hocking, E. K.

    2002-01-01

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment, some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information

  15. Long range diffusion of hydrogen in yttrium

    International Nuclear Information System (INIS)

    Anderson, I.S.; Scherrer, P.; Ross, D.K.

    1989-01-01

    The diffusion of H in single crystals of YH 0.2 is investigated by means of Quasielastic neutron scattering between 593 K and 695 K. Individual jump rates giving rise to long range and local diffusion are determined. (orig.)

  16. Testing for long-range dependence in world stock markets

    OpenAIRE

    Cajueiro, Daniel Oliveira; Tabak, Benjamin Miranda

    2008-01-01

    In this paper, we show a novel approach to rank stock market indices in terms of weak form efficiency using state of the art methodology in statistical physics. We employ the R/S and V/S methodologies to test for long-range dependence in equity returns and volatility. Empirical results suggests that although emerging markets possess stronger long-range dependence in equity returns than developed economies, this is not true for volatility. In the case of volatility, Hurst exponents...

  17. Urban planning, traffic planning and traffic safety of pedestrians and cyclists : report presented to the 1979 Road Research Symposium on Safety of Pedestrians and Cyclists, OECD Headquarters, Paris, 14-16 May 1979. Session III: Physical Countermeasures; Subsession III.1: Urban planning and traffic planning.

    NARCIS (Netherlands)

    Wegman, F.C.M.

    1979-01-01

    The traffic safety of pedestrians and cyclists can be improved by means of urban planning and traffic planning, as one of the possibilities. This paper discusses the framework of these measures and activities and also the effects on the field of traffic planning. Chapter I show that it is not

  18. Long range diffusion of hydrogen in yttrium

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, I S; Scherrer, P [Paul Scherrer Inst., Villigen (Switzerland); Ross, D K [Birmingham Univ. (UK). Dept. of Physics; Bonnet, J E [Laboratoire pour l' Utilisation du Rayonnement Electromagnetique (LURE), Paris-11 Univ., 91 - Orsay (France)

    1989-01-01

    The diffusion of H in single crystals of YH{sub 0.2} is investigated by means of Quasielastic neutron scattering between 593 K and 695 K. Individual jump rates giving rise to long range and local diffusion are determined. (orig.).

  19. Long-range correlations and universality in plasma edge turbulence

    International Nuclear Information System (INIS)

    Milligen, B.Ph. van; Pedrosa, M.A.; Carreras, B.A.

    1999-01-01

    Long-range correlations in turbulence, associated with self-similarity of the fluctuations, are a signature of transport by avalanches as occurs in Self-Organized Critical systems. We have investigated long-range correlations in plasma edge fluctuations in a variety of fusion devices, using the Rescaled-Range and similar techniques. We find that the degree of self-similarity in confining devices is high and similar between devices, and much different from non-confining devices where it is low. Likewise, we find that turbulent spectra show a high degree of similarity between devices. These findings strongly indicate the existence of universality in plasma edge (ohmic) turbulence, and demonstrate its non-Gaussian character. (author)

  20. Long-Range Planning: Finding Fiscal Certainty in a Time of Uncertainty

    Science.gov (United States)

    Malinowski, Matthew J.

    2012-01-01

    To navigate today's fiscal challenges successfully, school districts must constantly examine the long-term fiscal implications of policy, programmatic, and human resource decisions on their organization. They must look at the effect of such items as bargaining agreements, contracted services, placement costs, transportation costs, benefits,…

  1. Greenhouse gas mitigation potential of biomass energy technologies in Vietnam using the long range energy alternative planning system model

    International Nuclear Information System (INIS)

    Kumar, Amit; Bhattacharya, S.C.; Pham, H.L.

    2003-01-01

    The greenhouse gas (GHG) mitigation potentials of number of selected Biomass Energy Technologies (BETs) have been assessed in Vietnam. These include Biomass Integrated Gasification Combined Cycle (BIGCC) based on wood and bagasse, direct combustion plants based on wood, co-firing power plants and Stirling engine based on wood and cooking stoves. Using the Long-range Energy Alternative Planning (LEAP) model, different scenarios were considered, namely the base case with no mitigation options, replacement of kerosene and liquefied petroleum gas (LPG) by biogas stove, substitution of gasoline by ethanol in transport sector, replacement of coal by wood as fuel in industrial boilers, electricity generation with biomass energy technologies and an integrated scenario including all the options together. Substitution of coal stoves by biogas stove has positive abatement cost, as the cost of wood in Vietnam is higher than coal. Replacement of kerosene and LPG cookstoves by biomass stove also has a positive abatement cost. Replacement of gasoline by ethanol can be realized after a few years, as at present the cost of ethanol is more than the cost of gasoline. The replacement of coal by biomass in industrial boiler is also not an attractive option as wood is more expensive than coal in Vietnam. The substitution of fossil fuel fired plants by packages of BETs has a negative abatement cost. This option, if implemented, would result in mitigation of 10.83 million tonnes (Mt) of CO 2 in 2010

  2. Aerospace Safety Advisory Panel

    Science.gov (United States)

    1999-01-01

    little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

  3. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  4. Study of beam-beam long range compensation with octupoles

    CERN Document Server

    AUTHOR|(CDS)2068329; Pieloni, Tatiana; Buffat, Xavier; Tambasco, Claudia

    2017-01-01

    Long range beam-beam effects are responsible for particle losses and define fundamental operational parameters of colliders (i.e. crossing angles, intensities, emittances, ${\\beta}$${^∗}$). In this study we propose octuple magnets as a possible scheme to efficiently compensate long-range beam-beam interactions with a global correction scheme. The impact and improvements on the dynamic aperture of colliding beams together with estimates of the luminosity potentials are dis- cussed for the HL-LHC upgrade and extrapolations made for the FCC project.

  5. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  6. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations

  7. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  8. Facility effluent monitoring plan for K area spent fuel storage basin

    International Nuclear Information System (INIS)

    Hunacek, G.S.

    1996-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity of the effluent monitoring system shall be ensured with updates of this report whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  9. A security/safety survey of long term care facilities.

    Science.gov (United States)

    Acorn, Jonathan R

    2010-01-01

    What are the major security/safety problems of long term care facilities? What steps are being taken by some facilities to mitigate such problems? Answers to these questions can be found in a survey of IAHSS members involved in long term care security conducted for the IAHSS Long Term Care Security Task Force. The survey, the author points out, focuses primarily on long term care facilities operated by hospitals and health systems. However, he believes, it does accurately reflect the security problems most long term facilities face, and presents valuable information on security systems and practices which should be also considered by independent and chain operated facilities.

  10. Planning in the Continuous Operations Environment of the International Space Station

    Science.gov (United States)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  11. The aviation safety reporting system

    Science.gov (United States)

    Reynard, W. D.

    1984-01-01

    The aviation safety reporting system, an accident reporting system, is presented. The system identifies deficiencies and discrepancies and the data it provides are used for long term identification of problems. Data for planning and policy making are provided. The system offers training in safety education to pilots. Data and information are drawn from the available data bases.

  12. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references

  13. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.

  14. Long-range hybrid ridge and trench plasmonic waveguides

    Energy Technology Data Exchange (ETDEWEB)

    Bian, Yusheng [State Key Laboratory for Mesoscopic Physics, Department of Physics, Peking University, Beijing 100871 (China); Gong, Qihuang, E-mail: qhgong@pku.edu.cn [State Key Laboratory for Mesoscopic Physics, Department of Physics, Peking University, Beijing 100871 (China); Collaborative Innovation Center of Quantum Matter, Beijing 100871 (China)

    2014-06-23

    We report a class of long-range hybrid plasmon polariton waveguides capable of simultaneously achieving low propagation loss and tight field localization at telecommunication wavelength. The symmetric (quasi-symmetric) hybrid configurations featuring high-refractive-index-contrast near the non-uniform metallic nanostructures enable significantly improved optical performance over conventional hybrid waveguides, exhibiting considerably longer propagation distances and dramatically enhanced figure of merits for similar degrees of confinement. Compared to their traditional long-range plasmonic counterparts, the proposed hybrid waveguides put much less stringent requirements on index-matching conditions, demonstrating nice performance under a wide range of physical dimensions and robust characteristics against certain fabrication imperfections. Studies concerning crosstalk between adjacent identical waveguides further reveal their potential for photonic integrations. In addition, alternative configurations with comparable guiding properties to the structures in our case studies are also proposed, which can potentially serve as attractive prototypes for numerous high-performance nanophotonic components.

  15. Nordic nuclear safety research program 1994-1997. Project coordination incl. SAM-4 general information issues. Report 1996. Plans for 1997

    International Nuclear Information System (INIS)

    1997-04-01

    NKS (Nordic Nuclear Safety Research) is a cooperative body in nuclear safety, radiation protection and emergency preparedness. Its purpose is to carry out cost-effective Nordic projects, thus producing research results, exercises, information, recommendations, manuals etc., to be used by decision makers and other concerned staff members at authorities and within the nuclear industry. This is the annual report for 1996, the third year of the fifth four-year NKS program (1994-1997). The report also contains plans for the rest of the program period, including budget proposals. The following major fields of research have been identified: reactor safety; radioactive waste; radioecology; emergency preparedness; and information issues. A total of nine projects are now under way within that framework. One project (RAK-1) is dedicated to reactor safety strategies: how to avoid serious accidents. A parallel project (RAK-2) deals with minimizing releases in case of an accident. When can an overheated reactor core still be water-cooled? What might be the consequences of the cooling? All Nordic countries have long-lived low and medium level radioactive waste that requires final disposal. One project (AFA-1) addresses that issue. Environmental impact of radioactive releases is studied in two radioecology projects. The project on marine radioecology, including sediment research (EKO-1), encompasses sampling, analysis and modeling. These are also key issues in the project on long ecological half-lives in semi-natural systems (EKO-2). The transfer of radioactive cesium and strontium in the chains soil - vegetation - sheep and mushroom - roe deer is studied, along with freshwater systems. Long-term doses to main is the ultimate output from the obtained models. Another aspect of environmental impact is emergency preparedness. A recently started project, EKO-5, addresses the issue of early planning for cleanup operations following a fallout. 'Early' in this context means within the

  16. Survivorship Care Plan Information Needs: Perspectives of Safety-Net Breast Cancer Patients.

    Science.gov (United States)

    Burke, Nancy J; Napoles, Tessa M; Banks, Priscilla J; Orenstein, Fern S; Luce, Judith A; Joseph, Galen

    2016-01-01

    Despite the Institute of Medicine's (IOM) 2005 recommendation, few care organizations have instituted standard survivorship care plans (SCPs). Low health literacy and low English proficiency are important factors to consider in SCP development. Our study aimed to identify information needs and survivorship care plan preferences of low literacy, multi-lingual patients to support the transition from oncology to primary care and ongoing learning in survivorship. We conducted focus groups in five languages with African American, Latina, Russian, Filipina, White, and Chinese medically underserved breast cancer patients. Topics explored included the transition to primary care, access to information, knowledge of treatment history, and perspectives on SCPs. Analysis of focus group data identified three themes: 1) the need for information and education on the transition between "active treatment" and "survivorship"; 2) information needed (and often not obtained) from providers; and 3) perspectives on SCP content and delivery. Our data point to the need to develop a process as well as written information for medically underserved breast cancer patients. An SCP document will not replace direct communication with providers about treatment, symptom management and transition, a communication that is missing in participating safety-net patients' experiences of cancer care. Women turned to peer support and community-based organizations in the absence of information from providers. "Clear and effective" communication of survivorship care for safety-net patients requires dedicated staff trained to address wide-ranging information needs and uncertainties.

  17. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  18. Long-range plasmonic waveguides with hyperbolic cladding

    DEFF Research Database (Denmark)

    Babicheva, Viktoriia E.; Shalaginov, Mikhail Y.; Ishii, Satoshi

    2015-01-01

    waveguides. We show that the proposed structures support long-range surface plasmon modes, which exist when the permittivity of the core matches the transverse effective permittivity component of the metamaterial cladding. In this regime, the surface plasmon polaritons of each cladding layer are strongly...

  19. Fluctuation-induced long-range interactions in polymer systems

    International Nuclear Information System (INIS)

    Semenov, A N; Obukhov, S P

    2005-01-01

    We discover a new universal long-range interaction between solid objects in polymer media. This polymer-induced interaction is directly opposite to the van der Waals attraction. The predicted effect is deeply related to the classical Casimir interactions, providing a unique example of universal fluctuation-induced repulsion rather than normal attraction. This universal repulsion comes from the subtracted soft fluctuation modes in the ideal counterpart of the real polymer system. The effect can also be interpreted in terms of subtracted (ghost) large-scale polymer loops. We establish the general expressions for the energy of polymer-induced interactions for arbitrary solid particles in a concentrated polymer system. We find that the correlation function of the polymer density in a concentrated solution of very long chains follows a scaling law rather than an exponential decay at large distances. These novel universal long-range interactions can be of importance in various polymer systems. We discuss the ways to observe/simulate these fluctuation-induced effects

  20. Long-Range Big Quantum-Data Transmission

    Science.gov (United States)

    Zwerger, M.; Pirker, A.; Dunjko, V.; Briegel, H. J.; Dür, W.

    2018-01-01

    We introduce an alternative type of quantum repeater for long-range quantum communication with improved scaling with the distance. We show that by employing hashing, a deterministic entanglement distillation protocol with one-way communication, one obtains a scalable scheme that allows one to reach arbitrary distances, with constant overhead in resources per repeater station, and ultrahigh rates. In practical terms, we show that, also with moderate resources of a few hundred qubits at each repeater station, one can reach intercontinental distances. At the same time, a measurement-based implementation allows one to tolerate high loss but also operational and memory errors of the order of several percent per qubit. This opens the way for long-distance communication of big quantum data.

  1. LBNL Institutional Plan, FY 1996--2001. Draft

    International Nuclear Information System (INIS)

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions

  2. LBNL Institutional Plan, FY 1996--2001. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  3. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  4. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  5. Progress of nuclear safety research-2004

    International Nuclear Information System (INIS)

    Anoda, Yoshinari; Ebine, Noriya; Chuto, Toshinori; Sato, Satoshi; Ishikawa, Jun; Yamamoto, Toshihiro; Munakata, Masahiro; Asakura, Toshihide; Yamaguchi, Tetsuji; Kida, Takashi; Matsui, Hiroki; Haneishi, Akihiro; Araya, Fumimasa

    2005-03-01

    JAERI is conducting nuclear safety research primarily at the Nuclear Safety Research Center in close cooperation with the related departments in accordance with the Long Term Plan for Development and Utilization of Nuclear Energy and Annual Plan for Safety Research issued by the Japanese government. The fields of conducting safety research at JAERI are the engineering safety of nuclear power plants and nuclear fuel cycle facilities, and radioactive waste management as well as advanced technology for safety improvement or assessment. Also, JAERI has conducted international collaboration to share the information on common global issues of nuclear safety and to supplement own research. Moreover, when accidents occurred at nuclear facilities, JAERI has taken a responsible role by providing technical experts and investigation for assistance to the government or local public body. This report summarizes the nuclear safety research activities of JAERI from April 2002 through March 2004 and utilized facilities. (author)

  6. Long term safety requirements and safety indicators for the assessment of underground radioactive waste repositories

    International Nuclear Information System (INIS)

    Vovk, Ivan

    1998-01-01

    This presentation defines: waste disposal, safety issues, risk estimation; describes the integrated waste disposal process including quality assurance program. Related to actinides inventory it shows the main results of calculated activity obtained by deterministic estimation. It includes the Radioactive Waste Safety Standards and requirements; features related to site, design and waste package characteristics, as technical long term safety criteria for radioactive waste disposal facilities. Fundamental concern regarding the safety of radioactive waste disposal systems is their radiological impact on human beings and the environment. Safety requirements and criteria for judging the level of safety of such systems have been developed and there is a consensus among the international community on their basis within the well-established system of radiological protection. So far, however, little experience has been gained in applying long term safety criteria to actual disposal systems; consequently, there is an international debate on the most appropriate nature and form of the criteria to be used, taking into account the uncertainties involved. Emerging from the debate is the increasing conviction that the combined use of a variety of indicators would be advantageous in addressing the issue of reasonable assurance in the different time frames involved and in supporting the safety case for any particular repository concept. Indicators including risk, dose, radionuclide concentration, transit time, toxicity indices, fluxes at different points within the system, and barrier performance have all been identified as potentially relevant. Dose and risk are the indicators generally seen as most fundamental, as they seek directly to describe the radiological impact of a disposal system, and these are the ones that have been incorporated into most national standards to date. There are, however, certain problems in applying them. Application of a variety of different indicators

  7. System safety program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1976-01-01

    The safety engineering effort to be undertaken in achieving an acceptable level of safety in the Brayton Isotope Power System (BIPS) development program is discussed. The safety organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are described. The plan will be updated periodically as the need arises

  8. Direct Observation of Long-Range Transport Using Continuously Sounding Balloons and Near-Real-Time Trajectory Modeling

    Science.gov (United States)

    Voss, P. B.; Zaveri, R. A.; Berkowitz, C. M.

    2009-12-01

    Controlled Meteorological (CMET) balloons have been used in several recent studies to measure long-range transport over periods as long as 30 hours and distances up to 1000 kilometers. By repeatedly performing shallow soundings as they drift, CMET balloons can quantify evolving atmospheric structure, mixing events, shear advection, and dispersion during transport. In addition, the quasi-Lagrangian wind profiles can be used to drive a multi-layer trajectory model in which the advected air parcels follow the underlying terrain, or are constrained by altitude, potential temperature, or tracer concentration. Data from a coordinated balloon-aircraft study of long range transport over Texas (SETTS 2005) show that the reconstructed trajectories accurately track residual-layer urban outflow (and at times even its fine-scale structure) over distances of many hundreds of kilometers. The reconstructed trajectories and evolving profile visualizations are increasingly being made available in near-real time during balloon flights, supporting data-driven flight planning and sophisticated process studies relevant to atmospheric chemistry and climate. Multilayer trajectories (black grids) derived from CMET balloon flight paths (grey lines) for a transport event across Texas in 2005.

  9. Electricity demand and supply scenarios for Maharashtra (India) for 2030: An application of long range energy alternatives planning

    International Nuclear Information System (INIS)

    Kale, Rajesh V.; Pohekar, Sanjay D.

    2014-01-01

    Forecasting of electricity demand has assumed a lot of importance to provide sustainable solutions to the electricity problems. LEAP has been used to forecast electricity demand for the target year 2030, for the state of Maharashtra (India). Holt’s exponential smoothing method has been used to arrive at suitable growth rates. Probable projections have been generated using uniform gross domestic product (GDP) growth rate and different values of elasticity of demands. Three scenarios have been generated which include Business as Usual (BAU), Energy Conservation (EC) and Renewable Energy (REN). Subsequent analysis on the basis of energy, environmental influence and cost has been done. In the target year 2030, the projected electricity demand for BAU and REN has increased by 107.3 per cent over the base year 2012 and EC electricity demand has grown by 54.3 per cent. The estimated values of green house gas (GHG) for BAU and EC, in the year 2030, are 245.2 per cent and 152.4 per cent more than the base year and for REN it is 46.2 per cent less. Sensitivity analysis has been performed to study the effect on the total cost of scenarios. Policy implications in view of the results obtained are also discussed. - Highlights: • Forecasted electricity scenarios by Long Range Energy Alternatives Planning (LEAP). • Critically analyzed the demand and supply prior to 2012 for a period of six years. • Used Holt’s exponential smoothing method ARIMA (0,1,1) for finding growth rates. • Devised suitable LEAP model for the generated scenarios. • Discussed policy implications for the generated scenarios

  10. Long-range alpha detector (LRAD)

    International Nuclear Information System (INIS)

    MacArthur, D.W.; McAtee, J.L.

    1991-01-01

    Historically, alpha detectors have been limited by the very short range of alpha particles in air and by relatively poor sensitivity, even if the particles are intercepted. Of necessity, these detectors are operated in a vacuum or in close proximity to the source if reasonable efficiency is desired. In our new long-range alpha detector (LRAD), alpha particles interact with the ambient air, producing ionization in the air at the rate of about 30,000 ion pairs per MeV of alpha energy. These charges can be transported over significant distances (several meters) in a moving current of air generated by a small fan. An ion chamber located in front of the fan measures the current carried by the moving ions. The LRAD-based monitor is more sensitive and more thorough than conventional monitors. We present current LRAD sensitivity limits and results, practical monitor designs, and proposed uses for LRAD monitors. 4 refs., 7 figs

  11. Power plants and safety 1982

    International Nuclear Information System (INIS)

    1982-01-01

    The papers of this volume deal with the whole range of safety issues from planning and construction to the operation of power plants, and discuss also issues like availability and safety of power plants, protective clothes and their incommodating effect, alternatives for rendering hot-water generators safe and the safety philosophy in steam turbine engineering. (HAG) [de

  12. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  13. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  14. Long-term safety assessment of trench-type surface repository at Chernobyl, Ukraine - computer model and comparison with results from simplified models

    International Nuclear Information System (INIS)

    Haverkamp, B.; Krone, J.; Shybetskyi, I.

    2013-01-01

    The Radioactive Waste Disposal Facility (RWDF) Buryakovka was constructed in 1986 as part of the intervention measures after the accident at Chernobyl NPP (ChNPP). Today, the surface repository for solid low and intermediate level waste (LILW) is still being operated but its maximum capacity is nearly reached. Long-existing plans for increasing the capacity of the facility shall be implemented in the framework of the European Commission INSC Programme (Instrument for Nuclear Safety Co-operation). Within the first phase of this project, DBE Technology GmbH prepared a safety analysis report of the facility in its current state (SAR) and a preliminary safety analysis report (PSAR) for a future extended facility based on the planned enlargement. In addition to a detailed mathematical model, also simplified models have been developed to verify results of the former one and enhance confidence in the results. Comparison of the results show that - depending on the boundary conditions - simplifications like modeling the multi trench repository as one generic trench might have very limited influence on the overall results compared to the general uncertainties associated with respective long-term calculations. In addition to their value in regard to verification of more complex models which is important to increase confidence in the overall results, such simplified models can also offer the possibility to carry out time consuming calculations like probabilistic calculations or detailed sensitivity analysis in an economic manner. (authors)

  15. Sandia National Laboratories land use permit for operations at Oliktok Alaska Long Range Radar Station.

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher Spyros

    2013-02-01

    The property subject to this Environmental Baseline Survey (EBS) is located at the Oliktok Long Range Radar Station (LRRS). The Oliktok LRRS is located at 70À 30 W latitude, 149À 53 W longitude. It is situated at Oliktok Point on the shore of the Beaufort Sea, east of the Colville River. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

  16. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  17. Sexual Safety Planning as an HIV Prevention Strategy for Survivors of Domestic Violence.

    Science.gov (United States)

    Foster, Jill; Núñez, Ana; Spencer, Susan; Wolf, Judith; Robertson-James, Candace

    2016-06-01

    Victims of domestic violence (DV) are not only subject to physical and emotional abuse but may also be at increased risk for less recognized dangers from infection with human immunodeficiency virus (HIV) and other sexually transmitted pathogens. Because of the close link between DV and sexual risk, women need to be educated about the consequences of acquiring a life-threatening sexually transmitted infection, risk reduction measures, and how to access appropriate HIV services for diagnosis and treatment. It is therefore critical for DV workers to receive sufficient training about the link between DV and HIV risk so that sexual safety planning can be incorporated into activities with their clients in the same way as physical safety plans. In this article, we discuss how the Many Hands Working Together project provides interactive training for workers in DV and DV-affiliated agencies to increase their knowledge about HIV and teach sexual safety planning skills to achieve HIV risk reduction.

  18. Safety assessment of indoor live fire range, May 1989

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-05-01

    The following Safety Assessment (SA) pertains to the indoor live fire range (LFR) at EG&G Mound Applied Technology plant. The purpose of the indoor LFR is to conduct training with live ammunition for all designated personnel. The SA examines the risks that are attendant to the operation of an indoor LFR for this purpose.

  19. Quantum transport with long-range steps on Watts-Strogatz networks

    Science.gov (United States)

    Wang, Yan; Xu, Xin-Jian

    2016-07-01

    We study transport dynamics of quantum systems with long-range steps on the Watts-Strogatz network (WSN) which is generated by rewiring links of the regular ring. First, we probe physical systems modeled by the discrete nonlinear schrödinger (DNLS) equation. Using the localized initial condition, we compute the time-averaged occupation probability of the initial site, which is related to the nonlinearity, the long-range steps and rewiring links. Self-trapping transitions occur at large (small) nonlinear parameters for coupling ɛ=-1 (1), as long-range interactions are intensified. The structure disorder induced by random rewiring, however, has dual effects for ɛ=-1 and inhibits the self-trapping behavior for ɛ=1. Second, we investigate continuous-time quantum walks (CTQW) on the regular ring ruled by the discrete linear schrödinger (DLS) equation. It is found that only the presence of the long-range steps does not affect the efficiency of the coherent exciton transport, while only the allowance of random rewiring enhances the partial localization. If both factors are considered simultaneously, localization is greatly strengthened, and the transport becomes worse.

  20. Netherlands Army Long Range Anti Armour Study - Status Report

    OpenAIRE

    Schagen, P.A.B. van

    1989-01-01

    At the end of the nineties the munition for the TOW weapon system in use at The Netherlands army, has to be replaced. The Life of Type of The Tow carrier ends in 2005. The long range anti armour study is to gain insight into the possibilities and limitations for the Netherlands army to deploy future (time period 1995-2000) weapon systems in the long range anti armour battle. The first study results are expected at the end of 1989. The study is sponsored by the Netherlands army and is carried ...

  1. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  2. Segmentation of time series with long-range fractal correlations

    Science.gov (United States)

    Bernaola-Galván, P.; Oliver, J.L.; Hackenberg, M.; Coronado, A.V.; Ivanov, P.Ch.; Carpena, P.

    2012-01-01

    Segmentation is a standard method of data analysis to identify change-points dividing a nonstationary time series into homogeneous segments. However, for long-range fractal correlated series, most of the segmentation techniques detect spurious change-points which are simply due to the heterogeneities induced by the correlations and not to real nonstationarities. To avoid this oversegmentation, we present a segmentation algorithm which takes as a reference for homogeneity, instead of a random i.i.d. series, a correlated series modeled by a fractional noise with the same degree of correlations as the series to be segmented. We apply our algorithm to artificial series with long-range correlations and show that it systematically detects only the change-points produced by real nonstationarities and not those created by the correlations of the signal. Further, we apply the method to the sequence of the long arm of human chromosome 21, which is known to have long-range fractal correlations. We obtain only three segments that clearly correspond to the three regions of different G + C composition revealed by means of a multi-scale wavelet plot. Similar results have been obtained when segmenting all human chromosome sequences, showing the existence of previously unknown huge compositional superstructures in the human genome. PMID:23645997

  3. Segmentation of time series with long-range fractal correlations.

    Science.gov (United States)

    Bernaola-Galván, P; Oliver, J L; Hackenberg, M; Coronado, A V; Ivanov, P Ch; Carpena, P

    2012-06-01

    Segmentation is a standard method of data analysis to identify change-points dividing a nonstationary time series into homogeneous segments. However, for long-range fractal correlated series, most of the segmentation techniques detect spurious change-points which are simply due to the heterogeneities induced by the correlations and not to real nonstationarities. To avoid this oversegmentation, we present a segmentation algorithm which takes as a reference for homogeneity, instead of a random i.i.d. series, a correlated series modeled by a fractional noise with the same degree of correlations as the series to be segmented. We apply our algorithm to artificial series with long-range correlations and show that it systematically detects only the change-points produced by real nonstationarities and not those created by the correlations of the signal. Further, we apply the method to the sequence of the long arm of human chromosome 21, which is known to have long-range fractal correlations. We obtain only three segments that clearly correspond to the three regions of different G + C composition revealed by means of a multi-scale wavelet plot. Similar results have been obtained when segmenting all human chromosome sequences, showing the existence of previously unknown huge compositional superstructures in the human genome.

  4. Efficient Long-Range Hole Transport Through G-Quadruplexes.

    Science.gov (United States)

    Wu, Jingyuan; Meng, Zhenyu; Lu, Yunpeng; Shao, Fangwei

    2017-10-09

    DNA offers a means of long-range charge transport for biology and electric nanodevices. Here, a series of tetra-stranded G-quadruplexes were assembled within a dendritic DNA architecture to explore oxidative charge transport (hole transport) through the G-quadruplex. Efficient charge transport was achieved over 28 Å upon UV irradiation. Over a longer G-quadruplex bridge, hole transport was escalated to a higher efficiency, which resulted in a higher yield than that of the optimal duplex DNA for charge transport, that is, the adenine tract. Efficient long-range hole transport suggests tetra-stranded G-quadruplexes, instead of an oxidation hotspot, hold better potential as an electron conduit than duplex DNA. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  5. 78 FR 979 - Petition for Positive Train Control Safety Plan Approval and System Certification of the...

    Science.gov (United States)

    2013-01-07

    ...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP) approval and system certification of the Electronic Train Management System (ETMS) as required by 49 U.S.C...

  6. Jefferson Proving Ground, South of the Firing Line Health and Safety Plan, Volume 4

    National Research Council Canada - National Science Library

    1992-01-01

    .... The purpose of this Site Health and Safety Plan (SHSP) is to assign SECD personnel health and safety responsibilities, to prescribe mandatory operating procedures, and to establish personal-protective-equipment (PPE...

  7. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  8. Gauge hierarchy and long range forces

    International Nuclear Information System (INIS)

    Pal, P.B.; Keung, Wai-Yee; Chang, D.

    1990-01-01

    With the aid of simple examples, we show how a long range attractive force can arise in a gauge theory with a hierarchy. The force is due to the exchange of a Higgs boson whose mass and matter couplings are both naturally suppressed by the hierarchical mass ratio. Such bosons appear if there is an accidental global symmetry in the low-energy renormalizable Lagrangian after the high energy symmetry breaking. 6 refs

  9. Long-range forecasting of intermittent streamflow

    OpenAIRE

    F. F. van Ogtrop; R. W. Vervoort; G. Z. Heller; D. M. Stasinopoulos; R. A. Rigby

    2011-01-01

    Long-range forecasting of intermittent streamflow in semi-arid Australia poses a number of major challenges. One of the challenges relates to modelling zero, skewed, non-stationary, and non-linear data. To address this, a statistical model to forecast streamflow up to 12 months ahead is applied to five semi-arid catchments in South Western Queensland. The model uses logistic regression through Generalised Additive Models for Location, Scale and Shape (GAMLSS) to determine th...

  10. Long-range forecasting of intermittent streamflow

    OpenAIRE

    F. F. van Ogtrop; R. W. Vervoort; G. Z. Heller; D. M. Stasinopoulos; R. A. Rigby

    2011-01-01

    Long-range forecasting of intermittent streamflow in semi-arid Australia poses a number of major challenges. One of the challenges relates to modelling zero, skewed, non-stationary, and non-linear data. To address this, a probabilistic statistical model to forecast streamflow 12 months ahead is applied to five semi-arid catchments in South Western Queensland. The model uses logistic regression through Generalised Additive Models for Location, Scale and Shape (GAMLSS) to determine the probabil...

  11. Management plan of useful life; Plan de gestion de vida util

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Zapata, J. D.

    2009-07-01

    The Cofrentes NPP Life Management Plan is a plant management program that covers all those activities aimed at monitoring, controlling and mitigating the effects of ageing in the safety-related structures, systems and components, as well as in the equipment that is of particular importance for long-term availability of the plant. the methodology used is based on the system and methods of the so-called UNESA Methodology, whose safety-related aspects have been updated with the application of criteria defined in Licensing Renewal regulation 10 CFR 54. the text develops the details of this plan and describes its status at the present time. (Author)

  12. Annual plan of research on safety techniques against low level radioactive wastes, 1984-1988

    International Nuclear Information System (INIS)

    1984-01-01

    The establishment of the countermeasures for treating and disposing radioactive wastes has become an important subject for promoting the utilization of atomic energy. Especially as to low level radioactive wastes, the cumulative quantity has reached about 460,000 in terms of 200 l drums as of the end of March, 1983, and accompanying the development of the utilization of atomic energy, its rapid increase is expected. So far, as for the disposal of low level radioactive wastes, the research and development and the preparation of safety criteria and safety evaluation techniques have been carried out, following the basic policy of the Atomic Energy Commission to execute land disposal and ocean disposal in combination, first to make the test disposal after preliminary safety evaluation, and to shift to the full scale disposal based on the results. The annual plan was decided on July 22, 1983, and the first revision was carried out this time, therefore, it is reported here. The basic policy of establishing this annual plan, and the annual plan for safety technique research are described. (Kako, I.)

  13. A study of the long-range inspection method for on-line monitoring of pipes in nuclear power plants

    International Nuclear Information System (INIS)

    Eom, Heung Seop; Lim, Sa Hoe; Kim, Jae Hee; Kim, Young H.; Song, Sung Jin

    2005-01-01

    Deployment of an advanced on-line monitoring of the component integrity offers the prospect of an improved performance, enhanced safety, and reduced overall cost for nuclear power plants (NPPs). Also ultrasonic guided ultrasonic wave has been known as one of the promising techniques that could be utilized for on-line monitoring, because it enables us to undertake a long-range inspection of structures such as plates and pipes. The present work is aimed at developing a new method using ultrasonic guided waves for the on-line monitoring of pipes. For this purpose we fabricated the necessary hardware and carried out transmitter tuning, group velocity measurement, receiver tuning, and mode identification. Finally we carried out an experiment on a long-range inspection with the developed hardware and the techniques. In the experiment, we could detect the flaws at a distance of about 20M from the transmitter, and we could verify the possibility of using the developed hardware and techniques for on-line monitoring of pipes in NPPs

  14. Consideration of environmental change in the safety evaluation: Long-term climate scenarios in the Iberian Peninsula

    International Nuclear Information System (INIS)

    Recreo Jimenez, F.; Ruiz Rivas, C.

    1997-01-01

    The main objective of this report is twofold. On the one hand, to define the most likely sequences of climate states in the Iberian Peninsula for a period of 125 Ka into the future, to the next interglacial stage, 125 Ka AP; on the other hand, to establish potential climate scenarios during such a period of time determining also the variability ranges of primary climate and climate-related variables of interest to the post-closure performance assessment and underground repository safety evaluations. The report reviews the potential effects of environmental changes on the performance of underground radioactive waste repositories, emphasizing the consideration given to long-term climatic changes in radioactive waste disposal system safety evaluations. (Author)

  15. Regional and long-range transport of air pollution

    International Nuclear Information System (INIS)

    Sandroni, S.

    1987-01-01

    The Course lectures presented are organised in four sections: atmospheric transport, conversion, deposition of atmospheric trace constituents and associated problems; conventional and sophisticated techniques for atmospheric sounding (e.g., Sodar, Lidar, Cospec, tetroons, instrument-carrying aircraft) and simulation techniques (non-reactive tracers); models available for various applications (long-range episodes, long-term averages, photochemical and deposition processes); a comparison of performances of different models and the linearity problem in the formation of acid deposition

  16. Merging long range transportation planning with public health: a case study from Utah's Wasatch Front.

    Science.gov (United States)

    Burbidge, Shaunna K

    2010-01-01

    US transportation systems have been identified as a problem for public health, as they often encourage automobile transportation and discourage physical activity. This paper provides a case study examination of the Public Health Component of the Wasatch Front Regional Council's Regional Transportation Plan. This plan provides an example of what transportation planners at Utah's largest metropolitan planning organization (MPO) are doing to encourage physical activity through transportation. Existing active living research was used to guide recommendations using a process that included a comprehensive literature review and a review of existing state programs, advisory group and stakeholder meetings, and policy recommendations based on existing local conditions. Stakeholders from a diversity of background and interests came together with one common goal: to improve public health. Based on this collaborative process, nine policy approaches were specifically recommended for approval and integration in the Wasatch Front Regional Transportation Plan. By using current research as a guide and integrating a variety of interests, the Wasatch Front Regional Council is setting a new standard for a collaborative multi-modal focus in transportation planning, which can be replicated nationwide.

  17. Measurement based scenario analysis of short-range distribution system planning

    DEFF Research Database (Denmark)

    Chen, Peiyuan; Bak-Jensen, Birgitte; Chen, Zhe

    2009-01-01

    This paper focuses on short-range distribution system planning using a probabilistic approach. Empirical probabilistic distributions of load demand and distributed generations are derived from the historical measurement data and incorporated into the system planning. Simulations with various...... feasible scenarios are performed based on a local distribution system at Støvring in Denmark. Simulation results provide more accurate and insightful information for the decision-maker when using the probabilistic analysis than using the worst-case analysis, so that a better planning can be achieved....

  18. Identification of training and emergency-planning needs through job-safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Veltrie, J.

    1987-01-01

    Training and emergency-planning needs within the photovoltaic industry may be more accurately determined through the performance of detailed job-safety analysis. This paper outlines the four major components of such an analysis, namely operational review, hazards evaluation, personnel review and resources evaluation. It then shows how these may be developed into coherent training and planning recommendations, for both emergency and non-emergency situations.

  19. Long-range alpha detector

    International Nuclear Information System (INIS)

    MacArthur, D.W.; McAtee, J.L.

    1991-01-01

    Historically, alpha-particle and alpha-contamination detectors have been limited by the very short range of alpha particles in air and by relatively poor sensitivity even if the particles are intercepted. Alpha detectors have had to be operated in a vacuum or in close proximity to the source if reasonable efficiency is desired. Alpha particles interact with the ambient air, producing ionization in the air at the rate of ∼30,000 ion pairs per mega-electron-volt of alpha energy. These charges can be transported over significant distances (several meters) in a moving current of air generated by a small fan. An ion chamber located in front of the fan measures the current carried by the moving ions. The long-range alpha detector (LRAD) offers several advantages over more traditional alpha detectors. First and foremost, it can operate efficiently even if the contamination is not easily accessible. Second, ions generated by contamination in crevices and other unmonitorable locations can be detected if the airflow penetrates those areas. Third, all of the contamination on a large surface will generate ions that can be detected in a single detector; hence, the detector's sensitivity to distributed sources is not limited by the size of the probe. Finally, a simple ion chamber can detect very small electric currents, making this technique potentially quite sensitive

  20. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  1. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  2. Long-term energy planning with uncertain environmental performance metrics

    International Nuclear Information System (INIS)

    Parkinson, Simon C.; Djilali, Ned

    2015-01-01

    Highlights: • Environmental performance uncertainty considered in a long-term energy planning model. • Application to electricity generation planning in British Columbia. • Interactions with climate change mitigation and adaptation strategy are assessed. • Performance risk-hedging impacts the technology investment strategy. • Sensitivity of results to model formulation is discussed. - Abstract: Environmental performance (EP) uncertainties span a number of energy technology options, and pose planning risk when the energy system is subject to environmental constraints. This paper presents two approaches to integrating EP uncertainty into the long-term energy planning framework. The methodologies consider stochastic EP metrics across multiple energy technology options, and produce a development strategy that hedges against the risk of exceeding environmental targets. Both methods are compared within a case study of emission-constrained electricity generation planning in British Columbia, Canada. The analysis provides important insight into model formulation and the interactions with concurrent environmental policy uncertainties. EP risk is found to be particularly important in situations where environmental constraints become increasingly stringent. Model results indicate allocation of a modest risk premium in these situations can provide valuable hedging against EP risk

  3. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  4. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  5. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  6. Structure function analysis of long-range correlations in plasma turbulence

    International Nuclear Information System (INIS)

    Yu, C.X.; Gilmore, M.; Peebles, W.A.; Rhodes, T.L.

    2003-01-01

    Long-range correlations (temporal and spatial) have been predicted in a number of different turbulence models, both analytical and numerical. These long-range correlations are thought to significantly affect cross-field turbulent transport in magnetically confined plasmas. The Hurst exponent, H - one of a number of methods to identify the existence of long-range correlations in experimental data - can be used to quantify self-similarity scalings and correlations in the mesoscale temporal range. The Hurst exponent can be calculated by several different algorithms, each of which has particular advantages and disadvantages. One method for calculating H is via structure functions (SFs). The SF method is a robust technique for determining H with several inherent advantages that has not yet been widely used in plasma turbulence research. In this article, the SF method and its advantages are discussed in detail, using both simulated and measured fluctuation data from the DIII-D tokamak [J. L. Luxon and L. G. Davis, Fusion Technol. 8, 441 (1985)]. In addition, it is shown that SFs used in conjunction with rescaled range analysis (another method for calculating H) can be used to mitigate the effects of coherent modes in some cases

  7. Health and Safety Management Plan for the Plutonium Stabilization and Packaging System

    International Nuclear Information System (INIS)

    1996-01-01

    This Health and Safety Management Plan (HSMP) presents safety and health policies and a project health and safety organizational structure designed to minimize potential risks of harm to personnel performing activities associated with Plutonium Stabilization and Packaging System (Pu SPS). The objectives of the Pu SPS are to design, fabricate, install, and startup of a glovebox system for the safe repackaging of plutonium oxides and metals, with a requirement of a 50-year storage period. This HSMP is intended as an initial project health and safety submittal as part of a three phase effort to address health and safety issues related to personnel working the Pu SPS project. Phase 1 includes this HSMP and sets up the basic approach to health and safety on the project and addresses health and safety issues related to the engineering and design effort. Phase 2 will include the Site Specific Construction health and Safety Plan (SSCHSP). Phase 3 will include an additional addendum to this HSMP and address health and safety issues associated with the start up and on-site test phase of the project. This initial submittal of the HSMP is intended to address those activities anticipated to be performed during phase 1 of the project. This HSMP is intended to be a living document which shall be modified as information regarding the individual tasks associated with the project becomes available. These modifications will be in the form of addenda to be submitted prior to the initiation of each phase of the project. For additional work authorized under this project this HSMP will be modified as described in section 1.4

  8. Force-induced unzipping of DNA with long-range correlated sequence

    OpenAIRE

    Allahverdyan, A. E.; Gevorkian, Zh. S.

    2002-01-01

    We consider force-induced unzipping transition for a heterogeneous DNA model with a long-range correlated base-sequence. It is shown that as compared to the uncorrelated situation, long-range correlations smear the unzipping phase-transition, change its universality class and lead to non-self-averaging: the averaged behavior strongly differs from the typical ones. Several basic scenarios for this typical behavior are revealed and explained. The results can be relevant for explaining the biolo...

  9. Long-range Coulomb interactions in low energy (e,2e) data

    International Nuclear Information System (INIS)

    Waterhouse, D.

    2000-01-01

    Full text: Proper treatment of long-range Coulomb interactions has confounded atomic collision theory since Schrodinger first presented a quantum-mechanical model for atomic interactions. The long-range Coulomb interactions are difficult to include in models in a way that treats the interaction sufficiently well but at the same time ensures the calculation remains tractable. An innovative application of an existing multi-parameter (e,2e) data acquisition system will be described. To clarify the effects of long-range Coulomb interactions, we will report the correlations and interactions that occur at low energy, observed by studying the energy sharing between outgoing electrons in the electron-impact ionisation of krypton

  10. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  11. Safety in times of crises - the importance of industrial emergency plans

    International Nuclear Information System (INIS)

    Rademacher, H.; Schulten, R.

    1989-01-01

    Technical and organizational precautions cannot always avoid everyday risks such as accidents, fire, explosions, and other critical situations which without appropriate countermeasures can easily develop into emergencies. While in recent years considerable efforts have been going into improving the technical safety of industrial plants particularly susceptible to accidents (e.g. the nuclear and chemical industry), organizational safety seems to have been neglected. An analysis of different accidents reveals human fallibility rather than technical failures to be causing damage in many cases. Industrial emergency plans are considered to be contributing to the improvement of organizational safety. (orig.) [de

  12. Regulating the long-term safety of geological disposal of radioactive waste: practical issues and challenges

    International Nuclear Information System (INIS)

    2008-01-01

    Regulating the long-term safety of geological disposal of radioactive waste is a key part of making progress on the radioactive waste management issue. A survey of member countries has shown that differences exist both in the protection criteria being applied and in the methods for demonstrating compliance, reflecting historical and cultural differences between countries which in turn result in a diversity of decision-making approaches and frameworks. At the same time, however, these differences in criteria are unlikely to result in significant differences in long-term protection, as all the standards being proposed are well below levels at which actual effects of radiological exposure can be observed and a range of complementary requirements is foreseen. In order to enable experts from a wide range of backgrounds to debate the various aspects of these findings, the NEA organised an international workshop in November 2006 in Paris, France. Discussions focused on diversity in regulatory processes; the basis and tools for assuring long-term protection; ethical responsibilities of one generation to later generations and how these can be discharged; and adapting regulatory processes to the long time frames involved in implementing geological disposal. These proceedings include a summary of the viewpoints expressed as well as the 22 papers presented at the workshop. (author)

  13. Status of nuclear safety research - 2000

    International Nuclear Information System (INIS)

    Sobajima, Makoto; Sasajima, Hideo; Umemoto, Michitaka; Yamamoto, Toshihiro; Tanaka, Tadao; Togashi, Yoshihiro; Nakata, Masahito

    2000-11-01

    The nuclear safety research at JAERI is performed in accordance with the long term plan on nuclear research, development and use and the safety research yearly plan determined by the government and under close relationship to the related departments in and around the Nuclear Safety Research Center. The criticality accident having occurred in Tokai-mura in 1999 has been the highest level nuclear accident in Japan and ensuring safety in whole nuclear cycle is severely questioned. The causes of such an accident have to be clarified not only technical points but also organizational points, and it is extremely important to make efforts in preventing recurrence, to fulfill emergency plan and to improve the safety of whole nuclear fuel cycle for restoring the reliability by the people to nuclear energy system. The fields of conducting safety research are engineering safety research on reactor facilities and nuclear fuel cycle facilities including research on radioactive waste processing and disposal and research and development on future technology for safety improvement. Also, multinational cooperation and bilateral cooperation are promoted in international research organizations in the center to internationally share the recognition of world-common issues of nuclear safety and to attain efficient promotion of research and effective utilization of research resources. (author)

  14. The Nordic programme for nuclear safety 1990-1993. Plan for 1993

    International Nuclear Information System (INIS)

    1993-04-01

    In 1993 the fourth Nordic Nuclear Safety Research programme will be concluded with final reports on all of the eighteen projects. Each report will contain the results of the work carried out which has taken four years to complete and, at the same time, give a more general survey of the Northern countries' competence within the fields of emergency readiness in situations of abnormal radiation, radioactive waste and its disposal, radioecology and nuclear reactor safety - accessibility of appropriate information. Some of the reports will be published in the form of reference books or in the form of databases of direct assistance to the authorities. A number of seminars will be held so that the results and professional level of the reports can be discussed. The coordinators' and project leaders' plans for these activities are presented with the the amounts of money that project organizers have asked the Nordic Nuclear Safety Research programme to finance them with. During 1993 the plans for the programme starting in 1994 must be laid, and future researchers, project leaders, involved organizations and sponsors determined. (AB)

  15. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  16. 75 FR 35651 - Safety Zone, Long Island Sound Annual Fireworks Displays

    Science.gov (United States)

    2010-06-23

    ... Zone, Long Island Sound Annual Fireworks Displays AGENCY: Coast Guard, DHS. ACTION: Notice of enforcement of regulation. SUMMARY: The Coast Guard will enforce annual fireworks display safety zones for thirteen fireworks displays taking place throughout the Sector Long Island Sound Captain of the Port Zone...

  17. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  18. Segurança e produção: um modelo para o planejamento e controle integrado Safety and production: an integrated planning and control model

    Directory of Open Access Journals (Sweden)

    Tarcisio A. Saurin

    2002-01-01

    Full Text Available Este artigo apresenta um modelo de planejamento e controle da segurança no trabalho (PCS integrado ao processo de planejamento e controle da produção (PCP. O modelo foi desenvolvido por meio de dois estudos empíricos em obras industriais, adotando-se a pesquisa ação como estratégia de pesquisa. Os requisitos de segurança são integrados ao PCP em três níveis hierárquicos deste processo. No nível de longo prazo, o planejamento da segurança é configurado pelo desenvolvimento de análises preliminares de risco dos processos construtivos. A atualização e detalhamento da implantação destes planos é então feita por meio de sua integração aos níveis de médio e curto prazo do PCP.This paper presents a safety planning and control model (SPC that has been integrated to the production planning and control process. The model was developed through two action research empirical studies in industrial construction projects. Safety requirements are integrated into three hierarchical levels of planning and control process. At the long-term level, safety planning is featured by preliminary hazard analysis of construction processes. These plans are updated and detailed through its integration into both medium-term and short-term planning levels.

  19. Scenario-based transportation planning with involvement of metropolitan planning organizations.

    Science.gov (United States)

    2009-01-01

    The Office of Virginia's Secretary of Transportation identified 21 transportation policies and 42 performance criteria in Virginia's long-range multimodal transportation plan, VTrans2025. A subsequent planning effort, VTrans2035, provided direction f...

  20. Long range order in the ground state of two-dimensional antiferromagnets

    International Nuclear Information System (INIS)

    Neves, E.J.; Perez, J.F.

    1985-01-01

    The existence of long range order is shown in the ground state of the two-dimensional isotropic Heisenberg antiferromagnet for S >= 3/2. The method yields also long range order for the ground state of a larger class of anisotropic quantum antiferromagnetic spin systems with or without transverse magnetic fields. (Author) [pt

  1. Rapidly solidified long-range-ordered alloys

    International Nuclear Information System (INIS)

    Lee, E.H.; Koch, C.C.; Liu, C.T.

    1981-01-01

    The influence of rapid solidification processing on the microstructure of long-range-ordered alloys in the (Fe, Co, Ni) 3 V system has been studied by transmission electron microscopy. The main microstructural feature of the as-quenched alloys was a fine cell structure (approx. 300 nm diameter) decorated with carbide particles. This structure was maintained aftr annealing treatments which develop the ordered crystal structure. Other features of the microstructures both before and after annealing are presented and discussed. 6 figures

  2. Testing for long-range dependence in the Brazilian term structure of interest rates

    International Nuclear Information System (INIS)

    Cajueiro, Daniel O.; Tabak, Benjamin M.

    2009-01-01

    This paper presents empirical evidence of fractional dynamics in interest rates for different maturities for Brazil. A variation of a newly developed test for long-range dependence, the V/S statistic, with a post-blackening bootstrap is employed. Results suggest that Brazilian interest rates possess strong long-range dependence in volatility, even when considering the structural break in 1999. These findings imply that the development of policy models that give rise to long-range dependence in interest rates' volatility could be very useful. The long-short-term interest rates spread has strong long-range dependence, which suggests that traditional tests of expectation hypothesis of the term structure of interest rates may be misspecified.

  3. Population-based health promotion perspective for older driver safety: Conceptual framework to intervention plan

    Science.gov (United States)

    Classen, Sherrilene; Lopez, Ellen DS; Winter, Sandra; Awadzi, Kezia D; Ferree, Nita; Garvan, Cynthia W

    2007-01-01

    The topic of motor vehicle crashes among the elderly is dynamic and multi-faceted requiring a comprehensive and synergistic approach to intervention planning. This approach must be based on the values of a given population as well as health statistics and asserted through community, organizational and policy strategies. An integrated summary of the predictors (quantitative research), and views (qualitative research) of the older drivers and their stakeholders, does not currently exist. This study provided an explicit socio-ecological view explaining the interrelation of possible causative factors, an integrated summary of these causative factors, and empirical guidelines for developing public health interventions to promote older driver safety. Using a mixed methods approach, we were able to compare and integrate main findings from a national crash dataset with perspectives of stakeholders. We identified: 11 multi-causal factors for safe elderly driving; the importance of the environmental factors - previously underrated in the literature- interacting with behavioral and health factors; and the interrelatedness among many socio-ecological factors. For the first time, to our knowledge, we conceptualized the fundamental elements of a multi-causal health promotion plan, with measurable intermediate and long-term outcomes. After completing the detailed plan we will test the effectiveness of this intervention on multiple levels. PMID:18225470

  4. Long-range analysis of density fitting in extended systems

    Science.gov (United States)

    Varga, Scarontefan

    Density fitting scheme is analyzed for the Coulomb problem in extended systems from the correctness of long-range behavior point of view. We show that for the correct cancellation of divergent long-range Coulomb terms it is crucial for the density fitting scheme to reproduce the overlap matrix exactly. It is demonstrated that from all possible fitting metric choices the Coulomb metric is the only one which inherently preserves the overlap matrix for infinite systems with translational periodicity. Moreover, we show that by a small additional effort any non-Coulomb metric fit can be made overlap-preserving as well. The problem is analyzed for both ordinary and Poisson basis set choices.

  5. Long-range correlations and asymmetry in the Bitcoin market

    Science.gov (United States)

    Alvarez-Ramirez, J.; Rodriguez, E.; Ibarra-Valdez, C.

    2018-02-01

    This work studies long-range correlations and informational efficiency of the Bitcoin market for the period from June 30, 2013 to June 3rd, 2017. To this end, the detrended fluctuation analysis (DFA) was implemented over sliding windows to estimate long-range correlations for price returns. It was found that the Bitcoin market exhibits periods of efficiency alternating with periods where the price dynamics are driven by anti-persistence. The pattern is replicated by prices samples at day, hour and second frequencies. The Bitcoin market also presents asymmetric correlations with respect to increasing and decreasing price trending, with the former trend linked to anti-persistence of returns dynamics.

  6. Long-range correlation analysis of urban traffic data

    International Nuclear Information System (INIS)

    Peng, Sheng; Jun-Feng, Wang; Shu-Long, Zhao; Tie-Qiao, Tang

    2010-01-01

    This paper investigates urban traffic data by analysing the long-range correlation with detrended fluctuation analysis. Through a large number of real data collected by the travel time detection system in Beijing, the variation of flow in different time periods and intersections is studied. According to the long-range correlation in different time scales, it mainly discusses the effect of intersection location in road net, people activity customs and special traffic controls on urban traffic flow. As demonstrated by the obtained results, the urban traffic flow represents three-phase characters similar to highway traffic. Moreover, compared by the two groups of data obtained before and after the special traffic restrictions (vehicles with special numbered plates only run in a special workday) enforcement, it indicates that the rules not only reduce the flow but also avoid irregular fluctuation. (general)

  7. Verification of reactor safety codes

    International Nuclear Information System (INIS)

    Murley, T.E.

    1978-01-01

    The safety evaluation of nuclear power plants requires the investigation of wide range of potential accidents that could be postulated to occur. Many of these accidents deal with phenomena that are outside the range of normal engineering experience. Because of the expense and difficulty of full scale tests covering the complete range of accident conditions, it is necessary to rely on complex computer codes to assess these accidents. The central role that computer codes play in safety analyses requires that the codes be verified, or tested, by comparing the code predictions with a wide range of experimental data chosen to span the physical phenomena expected under potential accident conditions. This paper discusses the plans of the Nuclear Regulatory Commission for verifying the reactor safety codes being developed by NRC to assess the safety of light water reactors and fast breeder reactors. (author)

  8. 23 CFR 450.214 - Development and content of the long-range statewide transportation plan.

    Science.gov (United States)

    2010-04-01

    ...., transportation, safety, economic development, social and environmental effects, or energy) that were relevant to... time of adoption, that provides for the development and implementation of the multimodal transportation... consultation with affected non-metropolitan officials with responsibility for transportation using the State's...

  9. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  10. Regulatory Practices on Ageing Management and Long Term Operation of Nuclear Power Plants in the Ibero-American Region. Results of the FORO/IAEA Programme on Nuclear and Radiation Safety in Ibero-America

    International Nuclear Information System (INIS)

    2014-09-01

    Although the operating lifetime of a nuclear power plant was originally anticipated to be in the range of 30-40 years, 200 of the 434 currently in operation are over 30 years old. In this context, Member States have assigned high priority to continuing the operation of nuclear power plants beyond the lifetime initially planned - while also maintaining the highest safety conditions possible. It is thus essential to encourage international cooperative efforts in the development of safety regulatory practices on ageing management and long term operation. Established in 1997, the Ibero-American Forum of Radiological and Nuclear Regulatory Agencies (FORO) aims to strengthen its members' radiological and nuclear safety regulatory organizations. Through a regional network of radiological and nuclear safety regulators, States in the Ibero-American region have worked together to strengthen radiation protection for patients, to improve safety at radiation installations, to tightten controls on radioactive sources used in medicine, agriculture and industry, and to improve safety and security at nuclear power plants. Since FORO's creation, it has cooperated with the IAEA in areas of mututal interest, and a technical programme administered by the IAEA was established in 2003 and formalized in Practical Arrangements signed in 2010. This publication presents the results of the 2009-2010 FORO/IAEA project on regulatory practices on ageing management and safety considerations for extending the operating lifetime of nuclear power plants. The purpose of the project was to provide nuclear regulators in the region with guidance on regulatory criteria, assessment, regulatory inspection and periodic safety reviews relating to ageing management and long term operation of nuclear power plants. The results are presented in a set of four reports, with guidelines for FORO members and a summary report of the project. These reports contain valuable information for the development of future

  11. Long-term planning frame of controlled fusion research in the Federal Republic of Germany and within the scope of EURATOM

    International Nuclear Information System (INIS)

    1989-01-01

    Current R and D activities in the field of controlled nuclear fusion are investigating physics and technological problems rather than economic efficiency aspects of future fusion reactor systems. The report in hand compares the long-term plans and programmes set up on the European level with other countries' programmes, explains the international cooperative framework and activities, and goes into details of the Federal German research programme. Aspects of safety and environmental impacts are discussed. (HP) [de

  12. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  13. Safety evaluation report on Tennessee Valley Authority: Browns Ferry nuclear performance plan

    International Nuclear Information System (INIS)

    1989-10-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory commission staff. The Browns Ferry Nuclear Plant consists of three boiling-water reactors at a site in Limestone County, Alabama. The plan addresses the plant-specific concerns requiring resolution before the startup of Unit 2. The staff will inspect implementation of those TVA programs that address these concerns. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 85 refs

  14. Discharge-planning for long-term care needs: the values and priorities of older people, their younger relatives and health professionals.

    Science.gov (United States)

    Denson, Linley A; Winefield, Helen R; Beilby, Justin J

    2013-03-01

    Discharge-planning decisions about long-term care (LTC) can be difficult and distressing for older people, families and discharge-planning health professionals. Retrospective research suggests that despite good intentions and a shared focus on the best interests of the older person, stakeholders may hold very different values about good outcomes and how to decide them. We aimed to compare the opinions and values of frail elders living at home, younger relatives and health professionals experienced in discharge-planning, prospectively: before, not after, a LTC decision. We interviewed three types of stakeholders (10 older people, 8 relatives and 18 health professionals) using a hypothetical vignette about a frail elder leaving hospital. In a mixed methods design, we quantitatively compared the discharge plans and decision-makers that stakeholders suggested, and qualitatively analysed the 36 interview transcripts for participants' articulation of underlying values during these discussions. Older participants often suggested safe restrictive options (residential care, proxy decision-making) for the hypothetical frail elder, while advocating autonomy for themselves. Younger people generally endorsed autonomous decision-making and less restrictive discharge options especially if the elder was mentally competent, but reported difficult ethical tensions between safety and autonomy. Individual personality and preferences, mental capacity, and the importance of personal care in supporting autonomy were central themes consistent with the Ecological Theory of Aging. Accordingly, discharge planners can usefully articulate the balance of safety and autonomy, conceptualizing home care as maintaining independence rather than accepting dependence. Ethical training should incorporate sophisticated models of practice specifying both psychological and physical safety as components of beneficence. Few elders adopt a consumer approach to LTC: health professionals can encourage mid

  15. Strategic plan and strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below

  16. Experiences of care planning in England: interviews with patients with long term conditions

    Directory of Open Access Journals (Sweden)

    Newbould Jenny

    2012-07-01

    Full Text Available Abstract Background The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority in England for chronic disease management. However, it is not clear how care planning is currently understood, translated and implemented in primary care. This study explores experience of care planning in patients with long term conditions in three areas in England. Methods We conducted semi-structured interviews with 23 predominantly elderly patients with multiple long term conditions. The interviews were designed to explore variations in and emergent experiences of care planning. Qualitative analysis of interview transcripts involved reflexively coding and re-coding data into categories and themes. Results No participants reported experiencing explicit care planning discussions or receiving written documentation setting out a negotiated care plan and they were unfamiliar with the term ‘care planning’. However, most described some components of care planning which occurred over a number of contacts with health care professionals which we term”reactive” care planning. Here, key elements of care planning including goal setting and action planning were rare. Additionally, poor continuity and coordination of care, lack of time in consultations, and patient concerns about what was legitimate to discuss with the doctor were described. Conclusions Amongst this population, elements of care planning were present in their accounts, but a structured, comprehensive process and consequent written record (as outlined in English Department of Health policy was not evident. Further research needs to explore the advantages and disadvantages of different approaches to care planning for different patient groups.

  17. Long-term (5 year) safety of bronchial thermoplasty: Asthma Intervention Research (AIR) trial

    DEFF Research Database (Denmark)

    Thomson, Neil C; Rubin, Adalberto S; Niven, Robert M

    2011-01-01

    Bronchial thermoplasty (BT) is a bronchoscopic procedure that improves asthma control by reducing excess airway smooth muscle. Treated patients have been followed out to 5 years to evaluate long-term safety of this procedure.......Bronchial thermoplasty (BT) is a bronchoscopic procedure that improves asthma control by reducing excess airway smooth muscle. Treated patients have been followed out to 5 years to evaluate long-term safety of this procedure....

  18. Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN). The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections

  19. Comparing Safety and Efficacy of "Third-Generation" Antiepileptic Drugs: Long-Term Extension and Post-marketing Treatment.

    Science.gov (United States)

    Kwok, Charlotte S; Johnson, Emily L; Krauss, Gregory L

    2017-11-01

    Four "third-generation" antiepileptic drugs (AEDs) were approved for adjunctive treatment of refractory focal onset seizures during the past 10 years. Long-term efficacy and safety of the drugs were demonstrated in large extension studies and in reports of subgroups of patients not studied in pivotal trials. Reviewing extension study and post-marketing outcome series for the four newer AEDs-lacosamide, perampanel, eslicarbazepine acetate and brivaracetam-can guide clinicians in treating and monitoring patients. AED extension studies evaluate treatment retention, drug tolerability, and drug safety during individualized treatment with flexible dosing and thus provide information not available in rigid pivotal trials. Patient retention in the studies ranged from 75 to 80% at 1 year and from 36 to 68% at 2-year treatment intervals. Safety findings were generally similar to those of pivotal trials, with no major safety risks identified and with several specific adverse drug effects, such as hyponatremia, reported. The third-generation AEDs, some through new mechanisms and others with improved tolerability compared to related AEDs, provide new options in efficacy and tolerability.

  20. An overview of Ontario's 2013 long term energy plan

    International Nuclear Information System (INIS)

    Jobe, C.

    2014-01-01

    Ontario's 2013 Long Term Energy /Plan (LTEP) takes a pragmatic approach. The plan is designed to balance the following five principles namely: Cost effectiveness, Reliability, Clean energy, Community engagement, and Emphasis on conservation and demand management before building new generation. By taking a pragmatic and flexible approach and balancing these principles, Ontario's 2013 Long Term Energy Plan builds on the foundation laid by the 2010 LTEP while also lowering the projected total system costs. The key elements of the 2013 LTEP are described in this paper by highlighting the major features of these elements. (author)

  1. Evolution of a holistic systems approach to planning and managing road safety: the Victorian case study, 1970-2015.

    Science.gov (United States)

    Muir, Carlyn; Johnston, Ian R; Howard, Eric

    2018-06-01

    The Victorian Safe System approach to road safety slowly evolved from a combination of the Swedish Vision Zero philosophy and the Sustainable Safety model developed by the Dutch. The Safe System approach reframes the way in which road safety is viewed and managed. This paper presents a case study of the institutional change required to underpin the transformation to a holistic approach to planning and managing road safety in Victoria, Australia. The adoption and implementation of a Safe System approach require strong institutional leadership and close cooperation among all the key agencies involved, and Victoria was fortunate in that it had a long history of strong interagency mechanisms in place. However, the challenges in the implementation of the Safe System strategy in Victoria are generally neither technical nor scientific; they are predominantly social and political. While many governments purport to develop strategies based on Safe System thinking, on-the-ground action still very much depends on what politicians perceive to be publicly acceptable, and Victoria is no exception. This is a case study of the complexity of institutional change and is presented in the hope that the lessons may prove useful for others seeking to adopt more holistic planning and management of road safety. There is still much work to be done in Victoria, but the institutional cultural shift has taken root. Ongoing efforts must be continued to achieve alert and compliant road users; however, major underpinning benefits will be achieved through focusing on road network safety improvements (achieving forgiving infrastructure, such as wire rope barriers) in conjunction with reviews of posted speed limits (to be set in response to the level of protection offered by the road infrastructure) and by the progressive introduction into the fleet of modern vehicle safety features. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights

  2. ENSEMBLE methods to reconcile disparate national long range dispersion forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Mikkelsen, T; Galmarini, S; Bianconi, R; French, S [eds.

    2003-11-01

    ENSEMBLE is a web-based decision support system for real-time exchange and evaluation of national long-range dispersion forecasts of nuclear releases with cross-boundary consequences. The system is developed with the purpose to reconcile among disparate national forecasts for long-range dispersion. ENSEMBLE addresses the problem of achieving a common coherent strategy across European national emergency management when national long-range dispersion forecasts differ from one another during an accidental atmospheric release of radioactive material. A series of new decision-making 'ENSEMBLE' procedures and Web-based software evaluation and exchange tools have been created for real-time reconciliation and harmonisation of real-time dispersion forecasts from meteorological and emergency centres across Europe during an accident. The new ENSEMBLE software tools is available to participating national emergency and meteorological forecasting centres, which may choose to integrate them directly into operational emergency information systems, or possibly use them as a basis for future system development. (au)

  3. ENSEMBLE methods to reconcile disparate national long range dispersion forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Mikkelsen, T.; Galmarini, S.; Bianconi, R.; French, S. (eds.)

    2003-11-01

    ENSEMBLE is a web-based decision support system for real-time exchange and evaluation of national long-range dispersion forecasts of nuclear releases with cross-boundary consequences. The system is developed with the purpose to reconcile among disparate national forecasts for long-range dispersion. ENSEMBLE addresses the problem of achieving a common coherent strategy across European national emergency management when national long-range dispersion forecasts differ from one another during an accidental atmospheric release of radioactive material. A series of new decision-making 'ENSEMBLE' procedures and Web-based software evaluation and exchange tools have been created for real-time reconciliation and harmonisation of real-time dispersion forecasts from meteorological and emergency centres across Europe during an accident. The new ENSEMBLE software tools is available to participating national emergency and meteorological forecasting centres, which may choose to integrate them directly into operational emergency information systems, or possibly use them as a basis for future system development. (au)

  4. Ranges of ions in metals for use in particle treatment planning

    International Nuclear Information System (INIS)

    Jaekel, Oliver

    2006-01-01

    In proton and ion radiotherapy, the range of particles is calculated from x-ray computed tomography (CT) numbers. Due to the strong absorption of x-rays in a metal and a cut-off for large Hounsfield units (HU) in the software of most CT-scanners, a range calculation in metals cannot be based on the measured HU. This is of special importance when metal implants such as gold fillings or hip prostheses are close to the treatment volume. In order to overcome this problem in treatment planning for heavy charged particles, the correct ranges of ions in the metal relative to water have to be assigned in the CT data. Measurements and calculations of carbon ion ranges in various metals are presented that can be used in treatment planning to allow for a more accurate range calculation of carbon ion beams in titanium, steel, tungsten and gold. The suggested values for the relative water-equivalent range and their uncertainties are 3.13 (±3%) for titanium, 5.59 (±3%) for stainless steel and 10.25 (±4%) for gold. (note)

  5. Safety relevant aspects of the long-term intermediate storage of spent fuel elements and vitrified high-level radioactive wastes; Sicherheitstechnische Aspekte der langfristigen Zwischenlagerung von bestrahlten Brennelementen und verglastem HAW

    Energy Technology Data Exchange (ETDEWEB)

    Ellinger, A.; Geupel, S.; Gewehr, K.; Gmal, B.; Hannstein, V.; Hummelsheim, K.; Kilger, R.; Wagner, M. [Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (GRS), Koeln (Germany); Schmidt, G.; Spieth-Achtnich, A. [Oeko-Institut e.V. - Institut fuer angewandte Oekolgie (Germany)

    2010-04-15

    The currently in Germany pursued concept for management of spent fuel from nuclear power plants provides intermediate dry cask storage at the NPP sites until direct disposal in a deep geologic repository. In addition the earlier commissioned centralized dry storage facilities are being used for storage of high level radioactive waste returned from foreign reprocessing of German spent fuel performed so far. The dry interim storage facilities are licensed for 40 years of operation time. According to the German regulations a full scope periodic safety review is not required so far, neither practical experience on dry storage for this period of time is available. With regard to this background the report at hand is dealing with long term effects, which may affect safety of the interim storage during the 40 years period or beyond if appropriate, and with the question, whether additional analyses or monitoring measures may be required. Therefore relevant publications have been evaluated, calculations have been performed as well as a systematic screening with regard to loads and possible ageing effects has been applied to structures and components important for safety of the storage, in order to identify relevant long term effects, which may not have been considered sufficiently so far and to provide proposals for an improved ageing management. The report firstly provides an overview on the current state of technology describing shortly the national and international practice and experience. In the following chapters safety aspects of interim storage with regard to time dependent effects and variations are being analyzed and discussed. Among this not only technical aspects like the long term behavior of fuel elements, canisters and storage systems are addressed, but also operational long term aspects regarding personnel planning, know how conservation, documentation and quality management are taken into account. A separate chapter is dedicated to developing and describing

  6. Resolution of issues with renewable energy penetration in a long-range power system demand-supply planning

    International Nuclear Information System (INIS)

    Ogimoto, Kazuhiko; Ikeda, Yuichi; Kataoka, Kazuto; Ikegami, Takashi; Nonaka, Shunsuke; Azuma, Hitoshi

    2012-01-01

    Under the anticipated high penetration of variable renewable energy generation such as photovoltaic, the issue of supply demand balance should be evaluated and fixed. Technologies such as demand activation, and energy storage are expected to solve the issue. Under the situation, a long-range power system supply demand analysis should have the capability for the evaluation in its analysis steps of demand preparation, maintenance scheduling, and economic dispatch analysis. This paper presents results of a parametric analysis of the reduction of PV and Wind generation curtailment reduction by deployment of batteries. Based on a set of scenarios of the prospects of Japan's 10 power system demand-supply condition in 2030, the demand-supply balance capability are analyzed assuming PV and wind generation variation, demand activation and dispatchable batteries. (author)

  7. Improving food safety in the supply chain: Integrating traceability in production and distribution planning

    DEFF Research Database (Denmark)

    Grunow, Martin; Rong, Aiying; Akkerman, Renzo

    2008-01-01

    on production and distribution planning. Here, we develop a methodology for production and distribution planning in food supply chains which minimizes production and logistics costs and at the same time reduces food safety concerns, limits the size of potential recalls, and satisfies product quality...... with traceability from the viewpoint of information system development and technology development such as radio frequency identification (RFID) and DNA-based techniques. However, traceability and its implications for food safety are thus far not incorporated in the standard operations management literature...

  8. Modelling control of epidemics spreading by long-range interactions.

    Science.gov (United States)

    Dybiec, Bartłomiej; Kleczkowski, Adam; Gilligan, Christopher A

    2009-10-06

    We have studied the spread of epidemics characterized by a mixture of local and non-local interactions. The infection spreads on a two-dimensional lattice with the fixed nearest neighbour connections. In addition, long-range dynamical links are formed by moving agents (vectors). Vectors perform random walks, with step length distributed according to a thick-tail distribution. Two distributions are considered in this paper, an alpha-stable distribution describing self-similar vector movement, yet characterized by an infinite variance and an exponential power characterized by a large but finite variance. Such long-range interactions are hard to track and make control of epidemics very difficult. We also allowed for cryptic infection, whereby an infected individual on the lattice can be infectious prior to showing any symptoms of infection or disease. To account for such cryptic spread, we considered a control strategy in which not only detected, i.e. symptomatic, individuals but also all individuals within a certain control neighbourhood are treated upon the detection of disease. We show that it is possible to eradicate the disease by using such purely local control measures, even in the presence of long-range jumps. In particular, we show that the success of local control and the choice of the optimal strategy depend in a non-trivial way on the dispersal patterns of the vectors. By characterizing these patterns using the stability index of the alpha-stable distribution to change the power-law behaviour or the exponent characterizing the decay of an exponential power distribution, we show that infection can be successfully contained using relatively small control neighbourhoods for two limiting cases for long-distance dispersal and for vectors that are much more limited in their dispersal range.

  9. National consultation leads to agrivita research to practice plan for Canada.

    Science.gov (United States)

    Asselin, Johanne; MacLeod, Martha L P; Dosman, James A

    2009-01-01

    A gap exists between research development and its implementation in agricultural health and safety. In order to fill this gap, the goal of this project was to consult agricultural stakeholders across Canada in order to identify the health and safety priorities in research and knowledge translation, and then to propose an approach to bridge the gap. Between April and August 2007, "A National Stakeholder Consultation on Health and Safety Research and its Effective Translation to the Agricultural Sector" was initiated by the Canadian Centre for Heath and Safety in Agriculture. The experiences and opinions of stakeholders across Canada were gathered through focus groups with over 150 participants in seven Canadian provinces and a survey of 289 individuals across Canada. Stakeholders identified a range of health and safety research priorities. Chemical exposure, stress, and farm safety issues were immediate concerns and issues surrounding labor and trained workers, whereas health problems and environmental issues were long-term concerns. Results identified research and knowledge translation priorities, which provided elements for a proposed program aiming at bridging the gap existing between research development and its translation into practice. A request for a knowledge translation/transfer mechanism, where all agricultural stakeholders from researchers to end users are involved in the process, was identified. Findings from the national consultation were used to develop a business plan entitled "Agrivita Research to Practice Program: A Partnership Plan for Health and Safety and its Effective Transfer to the Agricultural Sector in Canada." The plan provides for a coordinated and integrated approach in Canada, conceptually drawing on the American experience established by The National Institute for Occupational Safety and Health.

  10. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  12. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  13. Relative phase asynchrony and long-range correlation of long-term solar magnetic activity

    Science.gov (United States)

    Deng, Linhua

    2017-07-01

    Statistical signal processing is one of the most important tasks in a large amount of areas of scientific studies, such as astrophysics, geophysics, and space physics. Phase recurrence analysis and long-range persistence are the two dynamical structures of the underlying processes for the given natural phenomenon. Linear and nonlinear time series analysis approaches (cross-correlation analysis, cross-recurrence plot, wavelet coherent transform, and Hurst analysis) are combined to investigate the relative phase interconnection and long-range correlation between solar activity and geomagnetic activity for the time interval from 1932 January to 2017 January. The following prominent results are found: (1) geomagnetic activity lags behind sunspot numbers with a phase shift of 21 months, and they have a high level of asynchronous behavior; (2) their relative phase interconnections are in phase for the periodic scales during 8-16 years, but have a mixing behavior for the periodic belts below 8 years; (3) both sunspot numbers and geomagnetic activity can not be regarded as a stochastic phenomenon because their dynamical behaviors display a long-term correlation and a fractal nature. We believe that the presented conclusions could provide further information on understanding the dynamical coupling of solar dynamo process with geomagnetic activity variation, and the crucial role of solar and geomagnetic activity in the long-term climate change.

  14. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S ampersand H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures

  15. Density of states and magnetotransport in Weyl semimetals with long-range disorder

    Science.gov (United States)

    Pesin, D. A.; Mishchenko, E. G.; Levchenko, A.

    2015-11-01

    We study the density of states and magnetotransport properties of disordered Weyl semimetals, focusing on the case of a strong long-range disorder. To calculate the disorder-averaged density of states close to nodal points, we treat exactly the long-range random potential fluctuations produced by charged impurities, while the short-range component of disorder potential is included systematically and controllably with the help of a diagram technique. We find that, for energies close to the degeneracy point, long-range potential fluctuations lead to a finite density of states. In the context of transport, we discuss that a self-consistent theory of screening in magnetic field may conceivably lead to nonmonotonic low-field magnetoresistance.

  16. Long Term Planning at IQ Metal

    DEFF Research Database (Denmark)

    2017-01-01

    This is a Danish version. This case about long term planning at the owner-managed manufacturing firm IQ Metal shows how the future management and ownership may be organized to utilize owner assets and minimize roadblocks. Initially, the owner-manager Bo Fischer Larsen explains how he acquired...... a stake in 2007 in the company which at that time was named Braendstrup Maskinfabrik. He furthermore expalins how he has developed the company based on a strategic plan focusing on professionalization and outsourcing. Next, the video shows how to type Bo Fischer Larsen's replies to the questions...... in The Owner Strategy Map into the questionnaire available on www.ejerstrategi-kortet.dk. Lastly, the Owner Strategy Map's recommendation of how to organize the future management and ownership of IQ Metal is explained....

  17. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  18. Long-range surface polaritons in thin layers of absorbing materials

    NARCIS (Netherlands)

    Zhang, Y.

    2011-01-01

    Long-range surface polaritons (LRSPs) are electromagnetic surface modes confined at the interfaces of an thin film surrounded by a homogeneous dielectric. These modes are generally characterized by the subwavelength confinement and the long propagation length. In case of a metallic thin film, the

  19. van der Waals forces in density functional theory: Perturbational long-range electron-interaction corrections

    International Nuclear Information System (INIS)

    Angyan, Janos G.; Gerber, Iann C.; Savin, Andreas; Toulouse, Julien

    2005-01-01

    Long-range exchange and correlation effects, responsible for the failure of currently used approximate density functionals in describing van der Waals forces, are taken into account explicitly after a separation of the electron-electron interaction in the Hamiltonian into short- and long-range components. We propose a 'range-separated hybrid' functional based on a local density approximation for the short-range exchange-correlation energy, combined with a long-range exact exchange energy. Long-range correlation effects are added by a second-order perturbational treatment. The resulting scheme is general and is particularly well adapted to describe van der Waals complexes, such as rare gas dimers

  20. Long Duration Head-Down Tilt Bed Rest Studies: Safety Considerations Regarding Vision Health

    Science.gov (United States)

    Cromwell, Ronita L.; Zanello, S. B.; Yarbough, P. O.; Ploutz-Snyder, Robert; Taibbi, G.; Vizzeri, G.

    2012-01-01

    Visual symptoms reported in astronauts returning from long duration missions in low Earth orbit, including hyperopic shift, choroidal folds, globe flattening and papilledema, are thought to be related to fluid shifts within the body due to microgravity exposure. Because of this possible relation to fluid shifts, safety considerations have been raised regarding the ocular health of head-down tilt (HDT) bed rest subjects. HDT is a widely used ground ]based analog that simulates physiological changes of spaceflight, including fluid shifts. Thus, vision monitoring has been performed in bed rest subjects in order to evaluate the safety of HDT with respect to vision health. Here we report ocular outcomes in 9 healthy subjects (age range: 27-48 years; Male/Female ratio: 8/1) completing bed rest Campaign 11, an integrated, multidisciplinary 70-day 6 degrees HDT bed rest study. Vision examinations were performed on a weekly basis, and consisted of office-based (2 pre- and 2 post-bed rest) and in-bed testing. The experimental design was a repeated measures design, with measurements for both eyes taken for each subject at each planned time point. Findings for the following tests were all reported as normal in each testing session for every subject: modified Amsler grid, red dot test, confrontational visual fields, color vision and fundus photography. Overall, no statistically significant differences were observed for any of the measures, except for both near and far visual acuity, which increased during the course of the study. This difference is not considered clinically relevant as may result from the effect of learning. Intraocular pressure results suggest a small increase at the beginning of the bed rest phase (p=0.059) and lesser increase at post-bed rest with respect to baseline (p=0.046). These preliminary results provide the basis for further analyses that will include correlations between intraocular pressure change pre- and post-bed rest, and optical coherence

  1. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  2. On discriminating between long-range dependence and changes in mean

    OpenAIRE

    Berkes, István; Horváth, Lajos; Kokoszka, Piotr; Shao, Qi-Man

    2006-01-01

    We develop a testing procedure for distinguishing between a long-range dependent time series and a weakly dependent time series with change-points in the mean. In the simplest case, under the null hypothesis the time series is weakly dependent with one change in mean at an unknown point, and under the alternative it is long-range dependent. We compute the CUSUM statistic Tn, which allows us to construct an estimator k̂ of a change-point. We then compute the statistic Tn,1 based on the observa...

  3. What Should Stay Put? Campus Landscape Planning for the Long Term.

    Science.gov (United States)

    Yahres, Mike Van

    2000-01-01

    Discusses campus landscape long-term planning and design decision making during campus alterations and upgrades. Those campus landscape elements that tend to remain in place and planning for their continued existence are discussed. (GR)

  4. Considering timescales in the post-closure safety of geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    2009-01-01

    A key challenge in the development of safety cases for the deep geological disposal of radioactive waste is handling the long time frame over which the radioactive waste remains hazardous. The intrinsic hazard of the waste decreases with time, but some hazard remains for extremely long periods. Safety cases for geological disposal typically address performance and protection for thousands to millions of years into the future. Over such periods, a wide range of events and processes operating over many different timescales may impact on a repository and its environment. Uncertainties in the predictability of such factors increase with time, making it increasingly difficult to provide definite assurances of a repository's performance and the protection it may provide over longer timescales. Timescales, the level of protection and the assurance of safety are all linked. Approaches to handling timescales for the geological disposal of radioactive waste are influenced by ethical principles, the evolution of the hazard over time, uncertainties in the evolution of the disposal system (and how these uncertainties themselves evolve) and the stability and predictability of the geological environment. Conversely, the approach to handling timescales can affect aspects of repository planning and implementation including regulatory requirements, siting decisions, repository design, the development and presentation of safety cases and the planning of pre- and post-closure institutional controls such as monitoring requirements. This is an area still under discussion among NEA member countries. This report reviews the current status and ongoing discussions of this issue. (author)

  5. A better understanding of long-range temporal dependence of traffic flow time series

    Science.gov (United States)

    Feng, Shuo; Wang, Xingmin; Sun, Haowei; Zhang, Yi; Li, Li

    2018-02-01

    Long-range temporal dependence is an important research perspective for modelling of traffic flow time series. Various methods have been proposed to depict the long-range temporal dependence, including autocorrelation function analysis, spectral analysis and fractal analysis. However, few researches have studied the daily temporal dependence (i.e. the similarity between different daily traffic flow time series), which can help us better understand the long-range temporal dependence, such as the origin of crossover phenomenon. Moreover, considering both types of dependence contributes to establishing more accurate model and depicting the properties of traffic flow time series. In this paper, we study the properties of daily temporal dependence by simple average method and Principal Component Analysis (PCA) based method. Meanwhile, we also study the long-range temporal dependence by Detrended Fluctuation Analysis (DFA) and Multifractal Detrended Fluctuation Analysis (MFDFA). The results show that both the daily and long-range temporal dependence exert considerable influence on the traffic flow series. The DFA results reveal that the daily temporal dependence creates crossover phenomenon when estimating the Hurst exponent which depicts the long-range temporal dependence. Furthermore, through the comparison of the DFA test, PCA-based method turns out to be a better method to extract the daily temporal dependence especially when the difference between days is significant.

  6. Helioseismology with long-range dark matter-baryon interactions

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Ilídio [Centro Multidisciplinar de Astrofísica, Instituto Superior Técnico, Universidade Tecnica de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa (Portugal); Panci, Paolo [CP3-Origins and DIAS, University of Southern Denmark, DK-5230 Odense (Denmark); Silk, Joseph, E-mail: ilidio.lopes@tecnico.ulisboa.pt, E-mail: panci@iap.fr, E-mail: silk@astro.ox.ac.uk [Institut d' Astrophysique, UMR 7095 CNRS, Université Pierre et Marie Curie, 98bis Blvd Arago, F-75014 Paris (France)

    2014-11-10

    Assuming the existence of a primordial asymmetry in the dark sector, we study how long-range dark matter (DM)-baryon interactions, induced by the kinetic mixing of a new U(1) gauge boson and a photon, affect the evolution of the Sun and, in turn, the sound speed the profile obtained from helioseismology. Thanks to the explicit dependence on the exchanged momenta in the differential cross section (Rutherford-like scattering), we find that DM particles with a mass of ∼10 GeV, kinetic mixing parameter of the order of 10{sup –9}, and a mediator with a mass smaller than a few MeV improve the agreement between the best solar model and the helioseismic data without being excluded by direct detection experiments. In particular, the LUX detector will soon be able to either constrain or confirm our best-fit solar model in the presence of a dark sector with long-range interactions that reconcile helioseismology with thermal neutrino results.

  7. Study on mid and long-term strategic plan formulation for newly-constructed NPP

    International Nuclear Information System (INIS)

    Song Lin

    2014-01-01

    Mid and Long-term strategic plan plays a key role for the management of a newly constructed nuclear power company. Among others, process, goals, and risk management, are the primary concerns during plan preparing. The article analyzed these three areas for Fuqing NPP, including the formulating process for the plan, the mid and long-term goal setting of the company, the major risk analysis and countermeasure selection therefore. Through that solutions and suggestions for strategic plan formulation were concluded for newly-constructed NPP. (author)

  8. Long-term surveillance plan for the Mexican Hat disposal site Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1997-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Mexican Hat, Utah, disposal site. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Mexican Hat disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the disposal site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Mexican Hat disposal site performs as designed. The program is based on two distinct types of activities: (1) site inspections to identify potential threats to disposal cell integrity, and (2) monitoring of selected seeps to observe changes in flow rates and water quality. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03. 18 refs., 6 figs., 1 tab

  9. Long-term surveillance plan for the Burro Canyon disposal cell, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1998-05-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Burro Canyon disposal cell in San Miguel County, Colorado. The US Nuclear Regulatory Commission (NRC) developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Burro Canyon disposal cell. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete at the Burro Canyon disposal cell and the NRC formally accepts this LTSP. Attachment 1 contains the concurrence letters from NRC. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Burro Canyon disposal cell performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. Ground water monitoring will not be required at the Burro Canyon disposal cell because the ground water protection strategy is supplemental standards based on low yield from the uppermost aquifer

  10. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  11. Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange : an RPSCB Peer Exchange

    Science.gov (United States)

    2014-08-01

    This report summarizes the Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange, held in Birmingham, Alabama, sponsored by the Federal Highway Administration (FHWA) Office of Safetys Roadway Safety Professi...

  12. The World Health Organization's water safety plan is much more than just an integrated drinking water quality management plan.

    Science.gov (United States)

    Viljoen, F C

    2010-01-01

    South Africa is a country of contrasts with far ranging variations in climate, precipitation rates, cultures, demographics, housing levels, education, wealth and skills levels. These differences have an impact on water services delivery as do expectations, affordability and available resources. Although South Africa has made much progress in supplying drinking water, the same cannot be said regarding water quality throughout the country. A concerted effort is currently underway to correct this situation and as part of this drive, water safety plans (WSP) are promoted. Rand Water, the largest water services provider in South Africa, used the World Health Organization (WHO) WSP framework as a guide for the development of its own WSP which was implemented in 2003. Through the process of implementation, Rand Water found the WHO WSP to be much more than just another integrated quality system.

  13. Planning India's long-term energy shipment infrastructures for electricity and coal

    International Nuclear Information System (INIS)

    Bowen, Brian H.; Canchi, Devendra; Lalit, Vishal Agarwal; Preckel, Paul V.; Sparrow, F.T.; Irwin, Marty W.

    2010-01-01

    The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both transmission and generation capacity expansions. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions.

  14. A computer simulation of a long-range CWFM radar showing the tradeoffs of performance as a function of range

    Science.gov (United States)

    Gordy, Robert S.; Zoledziowski, Severyn

    2011-06-01

    This paper describes a study of the operation of a long range CWFM radar using "System View" software for modeling and simulation. The System View software is currently offered by Agilent. The models that were studied include: a model illustrating the basic principle of operation of the CWFM radar, the range resolution of the radar, the effect of long range processing and the resultant approach with the tradeoff of detected range resolution due to Doppler frequency shift as a function of range distance. The study was performed as part of the design of an airborne CWFM radar. The radar can be designed with a single antenna or a dual antenna. The dual antenna approach is presented in this paper.

  15. Proceedings of the seminar on nuclear safety research and the workshop on reactor safety research

    International Nuclear Information System (INIS)

    2001-07-01

    The seminar on the nuclear safety research was held on November 20, 2000 according to the start of new five year safety research plan (FY2001-2005: established by Nuclear Safety Commission) with 79 participants. In the seminar, Commissioner Dr. Kanagawa gave the outline of the next five year safety research plan. Following this presentation, progresses and future scopes of safety researches in the fields of reactor facility, fuel cycle facility, radioactive waste and environmental impact on radiation at Japan Atomic Energy Research Institute (JAERI) were reported. After the seminar, the workshop on reactor safety research was held on November 21-22, 2000 with 141 participants. In the workshop, four sessions titled safety of efficient and economic utilization of nuclear fuel, safety related to long-term utilization of power reactors, research on common safety-related issues and toward further improvement of nuclear safety were organized and, outcomes and future perspectives in these wide research R and D in the related area at other organizations including NUPEC, JAPEIC and Kansai Electric Power Co. was presented in each session. This report compiles outlines of the presentations and used materials in the seminar and the workshop to form the proceedings for the both meetings. (author)

  16. 77 FR 51912 - Safety Zone; Tom Lyons Productions Fireworks, Long Island Sound, Sands Point, NY

    Science.gov (United States)

    2012-08-28

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket Number USCG-2012-0618] RIN 1625-AA00 Safety Zone; Tom Lyons Productions Fireworks, Long Island Sound, Sands Point, NY AGENCY.... 165.T01-0618 to read as follows: Sec. 165.T01-0618 Safety Zone; Tom Lyons Productions Fireworks, Long...

  17. Long-term Safety of a Geologic Repository: What does the public want to know?

    International Nuclear Information System (INIS)

    Kotra, Janet

    2008-01-01

    Janet Kotra of the U.S. NRC recounted the questions most frequently asked of the Commission's staff, concerning the long-term safety of the planned Yucca Mountain repository. The first question was related to who would decide whether the facility is safe enough. The next question linked to it is if regulatory staff is sufficiently qualified, and if they have access to independent sources of information or depend merely on the information provided by the implementer. The subsequent questions were about what criteria the regulator used and whether they were comprehensive enough. A separate group of questions addressed the safety of the technology, including the geologic features of the site, the engineered structures and the packaging of waste. Issues of documentation, operational control, long-term monitoring, oversight, and enforcement were also raised, along with the transparency of such processes and the accessibility of documents to the public. In addition, several questions were related to the fairness of decision making, public involvement, and the flexibility of the implementation process with regard to future knowledge and RD and D. Ms Kotra propounded that a single question was behind those cited above, namely whether one could rely on the regulator or not. Since it is not realistic to expect an overall consensus on the decision of the regulator agency, the goal should rather be to build confidence in the decision-making process. Key factors of confidence include openness on the part of the regulator and other decision-making institutions, and access to trustworthy representatives of these organisations

  18. Long-Term Hydrologic Monitoring Program. Project Shoal site, Sand Springs Range, Churchill County, Nevada

    International Nuclear Information System (INIS)

    1984-05-01

    The Shoal site is located in Churchill County in the northern part of the Sand Springs Range, approximately 30 miles (48.3 kilometers) southeast of Fallon, Nevada. Project Shoal, with a yield of 12 kilotons, was detonated October 26, 1963. It was conducted as part of the Vela program to obtain event measurements relating to the detection of underground nuclear detonations. The purpose of the Long-Term Hydrologic Monitoring Program at the Shoal site is to obtain data that will assure public safety; inform the public, the news media, and the scientific community relative to radiological contamination; and to document compliance with federal, state, and local antipollution requirements. The Shoal site geographical setting, climate, geology, and hydrology are described. Site history, including Shoal event information and Shoal monitoring is described. The final radiological surveys following the Shoal site cleanup described in this report indicate that there are no radiation levels above natural background on or near the land surface and that no hazard exists or is likely to occur during public use of the surface of the Shoal site. The Long-Term Hydrologic Monitoring Program for the Shoal site is described. 17 references, 4 figures

  19. Long-range airplane study: The consumer looks at SST travel

    Science.gov (United States)

    Landes, K. H.; Matter, J. A.

    1980-01-01

    The attitudes of long-range air travelers toward several basic air travel decisions, were surveyed. Of interest were tradeoffs involving time versus comfort and time versus cost as they pertain to supersonic versus conventional wide-body aircraft on overseas routes. The market focused upon was the segment of air travelers most likely to make that type of tradeoff decision: those having flown overseas routes for business or personal reasons in the recent past. The information generated is intended to provide quantifiable insight into consumer demand for supersonic as compared to wide-body aircraft alternatives for long-range overseas air travel.

  20. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program