WorldWideScience

Sample records for safety lesson plans

  1. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  2. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  3. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  4. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  5. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  6. With Interest It Comes To...Unconscionable Clauses in Sales Contracts. A Student's Lesson Plan [and] A Teacher's Lesson Plan [and] A Lawyer's Lesson Plan.

    Science.gov (United States)

    Howard, Estelle; And Others

    One of a series of secondary level teaching units presenting case studies with pro and con analysis of particular legal problems, the document presents a student's lesson plan, a teacher's lesson plan, and a lawyer's lesson plan on unconscionable clauses in sales contracts. The unit acquaints students with the operation of sales contracts and…

  7. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  8. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  9. Cost-effective facility disposition planning with safety and health lessons learned and good practices from the Oak Ridge Decontamination and Decommissioning Program

    International Nuclear Information System (INIS)

    1998-05-01

    An emphasis on transition and safe disposition of DOE excess facilities has brought about significant challenges to managing worker, public, and environmental risks. The transition and disposition activities involve a diverse range of hazardous facilities that are old, poorly maintained, and contain radioactive and hazardous substances, the extent of which may be unknown. In addition, many excess facilities do not have historical facility documents such as operating records, plant and instrumentation diagrams, and incident records. The purpose of this report is to present an overview of the Oak Ridge Decontamination and Decommissioning (D and D) Program, its safety performance, and associated safety and health lessons learned and good practices. Illustrative examples of these lessons learned and good practices are also provided. The primary focus of this report is on the safety and health activities and implications associated with the planning phase of Oak Ridge facility disposition projects. Section 1.0 of this report provides the background and purpose of the report. Section 2.0 presents an overview of the facility disposition activities from which the lessons learned and good practices discussed in Section 3.0 were derived

  10. "Frankenstein." [Lesson Plan].

    Science.gov (United States)

    Simon, Melanie

    Based on Mary Shelley's novel "Frankenstein," this lesson plan presents activities designed to help students understand that active readers interpret a novel (its characters, plot, setting, and theme) in different ways; and the great literature can be and has been adapted in many ways over time. The main activity of the lesson involves students…

  11. Bead Game Simulation. Lesson Plan.

    Science.gov (United States)

    Ripp, Ken

    This lesson plan offers students the opportunity to participate in the three basic economic systems (market, command, and tradition). By working in each of the systems, students will internalize the fundamental values present in each system and will gain insights into the basic advantages and disadvantages of each system. The lesson plan provides…

  12. Planning geometry lessons with learning platforms

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    mathematics teachers’ joint planning of a lesson in geometry with a learning platform called Meebook is analyzed using the instrumental approach. It is concluded that the interface in Meebook orients the teachers work toward what the students should do rather than what they should learn, although the latter......This paper investigates how mathematics teachers plan lessons with a recently implemented Danish learning platform designed to support teachers in planning lessons in line with a recent objective-oriented curriculum. Drawing on data from observations of and interviews with teachers, three...... is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  13. Lesson Planning with the Common Core

    Science.gov (United States)

    Estes, Linda A.; McDuffie, Amy Roth; Tate, Cathie

    2014-01-01

    Planning a lesson can be similar to planning a road trip--a metaphor the authors use to describe how they applied research and theory to their lesson planning process. A map and mode of transportation, the Common Core State Standards for Mathematics (CCSSM) and textbooks as resources, can lead to desired destinations, such as students engaging in…

  14. Supporting teachers' technology integration in lesson plans

    NARCIS (Netherlands)

    Janssen, Noortje

    2017-01-01

    Lesson planning offers rich opportunities for teachers to consider and implement technology in the classroom. This dissertation investigated the design and effectiveness of supplementary information to assist pre-service teachers during the lesson planning process. Based on the Technological,

  15. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  16. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  17. Keiko, Killer Whale. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities designed to help students understand that Keiko, the killer whale, lived for a long time in an aquarium and had to be taught to live independently; and that computer users can get updates on how Keiko is doing. The main activity of the lesson involves middle school students working in small groups to produce a…

  18. Development of short Indonesian lesson plan to improve teacher performance

    Science.gov (United States)

    Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.

    2018-01-01

    The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.

  19. Lessons learned on digital systems safety

    International Nuclear Information System (INIS)

    Sivertsen, Terje

    2005-06-01

    A decade ago, in 1994, lessons learned from Halden research activities on digital systems safety were summarized in the reports HWR-374 and HWR-375, under the title 'A Lessons Learned Report on Software Dependability'. The reports reviewed all activities made at the Halden Project in this field since 1977. As such, the reports provide a wealth of information on Halden research. At the same time, the lessons learned from the different activities are made more accessible to the reader by being summarized in terms of results, conclusions and recommendations. The present report provides a new lessons learned report, covering the Halden Project research activities in this area from 1994 to medio 2005. As before, the emphasis is on the results, conclusions and recommendations made from these activities, in particular how they can be utilized by different types of organisations, such as licensing authorities, safety assessors, power companies, and software developers. The contents of the report have been edited on the basis of input from a large number of Halden work reports, involving many different authors. Brief summaries of these reports are included in the last part of the report. (Author)

  20. Plant Identification Characteristics for Deciduous Trees & Shrubs. Lesson Plans.

    Science.gov (United States)

    Burkholder, Kathy

    This manual contains a group of lesson plans designed for use with a slide series (not included here). Its purpose is to introduce students to the basic concepts and terminology used in the identification of deciduous trees and shrubs. The manual is composed of 12 lesson plans. The first lesson is an introduction to plant identification. The…

  1. Recycling Lesson Plan

    Science.gov (United States)

    Okaz, Abeer Ali

    2013-01-01

    This lesson plan designed for grade 2 students has the goal of teaching students about the environmental practice of recycling. Children will learn language words related to recycling such as: "we can recycle"/"we can't recycle" and how to avoid littering with such words as: "recycle paper" and/or "don't throw…

  2. Medical faculty members' attitude on lesson planning Semnan University of Medical Sciences

    Directory of Open Access Journals (Sweden)

    Masomeh Saberian

    2003-01-01

    Full Text Available Background: Lesson planning has a distinct role in enhancing education quality, as well as maintaining the friendly and dynamic atmosphere of the academic environment and increasing student's initiatives for achieving better educational attainments. Lesson planning is a process for defining the goals, understanding the needs, and specifying available tools and possible limitations. Lesson planning is a written description of this process, which shows the materials, the route, the time, and the place of instructions, as well as a method for evaluating students. Purpose: to identify the attitudes of Semnan University of Medical Sciences (SUMS on lesson planning. Methods: Fifty-three faculty members of the SUMS participated in this study. A questionnaire was used, which contained 8 demographic questions, and 24 r questions for identification the faculty members' attitude. Questionnaires were distributed among the faculty members in sealed envelopes, without denoting their names. The questionnaires were gathered after being completed. Results were analyzed by calculating the mean, standard deviation, absolute and relative frequencies, and using Chi-square and Fischer exact test at the level of 5%. Results: II was shown that 88% of faculty members favoured lesson planning before the beginning of the semester. But they found lesson planning a difficult task, because of their heavy workload. Of the faculty members, 60.4% organized their teaching classes according to a designed lesson plan, and believed that it did affect the quality of their teaching, but 49.1% disagreed with distributing the designed lesson plan among the students. Discussion: Although professor favoured lesson planning and find it necessary to work according to such a plan, workload and lack of knowledge are defined as two main obstacles in doing so. It is believed that by decreasing the professor's workload and provision of lesson planning workshops, these problems could be solved

  3. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  4. Integrating self-regulated learning and discovery learning into English lesson plan

    Directory of Open Access Journals (Sweden)

    Sayukti Ni Kadek Heny

    2018-01-01

    Full Text Available The notion of learner-centeredness has been embedded in the National Curriculum of Indonesia, 2013 Curriculum. However, most of the teachers seem to be hardly acquainted with the concept of Self-Regulated Learning (SRL and discovery learning in the lesson planning. Considering the phenomenon, this study intends to explore the concept of Self-Regulated Learning in the lesson plan of English subject for a tenth-grade level by employing a qualitative design with data obtained from a teacher-made lesson plan and a semi-structured interview. The researcher used content analysis to analyze the lesson plan. Meanwhile, the qualitative data from interview result were preceded through a coding sheet and transcribed modified figure. The findings revealed an integration of SRL cyclical phase and discovery learning in the teacher-made lesson plan. Based on the discussion, the results need to be applied in a considerably large context, in order to see thoroughly dynamic integration between Self-Regulated Learning model, lesson planning and the concept of learner autonomy.

  5. Validitas Lesson Plan Berbasis Multiple Intelligences untuk Pembelajaran Matematika

    Directory of Open Access Journals (Sweden)

    Vigih Hery Kristanto

    2017-12-01

    Full Text Available The purpose of this research is to know the validity of Lesson Plan based on multiple intelligences for learning mathematics in junior high school students. This research is a simple research with qualitative type. The validity of Lesson Plan is seen through two aspects, namely the linguistic aspect and the substance (content aspect. Thus, the instrument used in this research is the Linguistic Aspects Validation Guidance and the Substance Validation Guidelines (contents Guidance. Validation is done by two validators Lingusitic expert field and Mathematics expert field. The results showed that the validity of linguistic aspects of 3.35 and the validity of the substance (content of 3.82, so it can be concluded Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on the language aspect. In addition, Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on aspects of substance (content.

  6. Basic safety principles: Lessons learned

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1997-01-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report)

  7. Basic safety principles: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Erp, J.B. van [Argonne National Lab., IL (United States)

    1997-09-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report).

  8. Lessons Learned for Decommissioning Planning

    International Nuclear Information System (INIS)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun

    2015-01-01

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1

  9. Teen worker safety training: methods used, lessons taught, and time spent.

    Science.gov (United States)

    Zierold, Kristina M

    2015-05-01

    Safety training is strongly endorsed as one way to prevent teens from performing dangerous tasks at work. The objective of this mixed methods study was to characterize the safety training that teenagers receive on the job. From 2010 through 2012, focus groups and a cross-sectional survey were conducted with working teens. The top methods of safety training reported were safety videos (42 percent) and safety lectures (25 percent). The top lessons reported by teens were "how to do my job" and "ways to spot hazards." Males, who were more likely to do dangerous tasks, received less safety training than females. Although most teens are getting safety training, it is inadequate. Lessons addressing safety behaviors are missing, training methods used are minimal, and the time spent is insignificant. More research is needed to understand what training methods and lessons should be used, and the appropriate safety training length for effectively preventing injury in working teens. In addition, more research evaluating the impact of high-quality safety training compared to poor safety training is needed to determine the best training programs for teens. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  10. Space reactor safety, 1985--1995 lessons learned

    International Nuclear Information System (INIS)

    Marshall, A.C.

    1995-01-01

    Space reactor safety activities and decisions have evolved over the last decade. Important safety decisions have been made in the SP-100, Space Exploration Initiative, NEPSTP, SNTP, and Bimodal Space Reactor programs. In addition, international guidance on space reactor safety has been instituted. Space reactor safety decisions and practices have developed in the areas of inadvertent criticality, reentry, radiological release, orbital operation, programmatic, and policy. In general, the lessons learned point out the importance of carefully reviewing previous safety practices for appropriateness to space nuclear programs in general and to the specific mission under consideration

  11. Space reactor safety, 1985--1995 lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, A.C.

    1995-12-31

    Space reactor safety activities and decisions have evolved over the last decade. Important safety decisions have been made in the SP-100, Space Exploration Initiative, NEPSTP, SNTP, and Bimodal Space Reactor programs. In addition, international guidance on space reactor safety has been instituted. Space reactor safety decisions and practices have developed in the areas of inadvertent criticality, reentry, radiological release, orbital operation, programmatic, and policy. In general, the lessons learned point out the importance of carefully reviewing previous safety practices for appropriateness to space nuclear programs in general and to the specific mission under consideration.

  12. How to Analyze Routines in Teachers' Thinking Processes during Lesson Planning.

    Science.gov (United States)

    Bromme, Rainer

    A justification for the study of teachers' routines, as they affect the preparation of lesson plans, prefaces this paper on teachers' thought processes during lesson planning. In focusing on the importance of research into teachers' routines, it is pointed out that lesson preparation and classroom routines permit teachers to direct attention to…

  13. Brothers Grimm. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  14. Smart Consumer Lesson Plans.

    Science.gov (United States)

    New Jersey Consortium for Consumer Education, Newark.

    Lesson plans are provided for use with different populations of pre-K through senior high school students in four different areas of consumer education. Eight units in advertising are included: A First Look at Ads (pre-K-Grade 3), Don't Judge a Book by Its Cover (Grades 1-3), Fatal Distraction (Junior High), Package Labeling (Junior High), Product…

  15. Development of a harmonized approach to safety assessment of decommissioning: Lessons learned from international experience (DeSa project)

    International Nuclear Information System (INIS)

    Percival, K.; Nokhamzon, J.-G.; Ferch, R.; Batandjieva, B.

    2006-01-01

    The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources. The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, i.e.; (i) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework; description of the facility; definition of decommissioning activities; hazard identification and analysis; calculation of consequences; and analysis of results; (ii) a deterministic approach to safety assessment is most commonly applied; (iii) a

  16. English language-in-education: A lesson planning model for subject ...

    African Journals Online (AJOL)

    English language-in-education: A lesson planning model for subject teachers. ... lack of critical academic language skills in English as the Language of Learning and ... process of lesson design and the 'forward' process of lesson presentation.

  17. The Paper Airplane Challenge: A Market Economy Simulation. Lesson Plan.

    Science.gov (United States)

    Owens, Kimberly

    This lesson plan features a classroom simulation that helps students understand the characteristics of a market economic system. The lesson plan states a purpose; cites student objectives; suggests a time duration; lists materials needed; and details a step-by-step teaching procedure. The "Paper Airplane Challenge" handout is attached. (BT)

  18. Lessons learned from the Galileo and Ulysses flight safety review experience

    International Nuclear Information System (INIS)

    Bennett, Gary L.

    1998-01-01

    In preparation for the launches of the Galileo and Ulysses spacecraft, a very comprehensive aerospace nuclear safety program and flight safety review were conducted. A review of this work has highlighted a number of important lessons which should be considered in the safety analysis and review of future space nuclear systems. These lessons have been grouped into six general categories: (1) establishment of the purpose, objectives and scope of the safety process; (2) establishment of charters defining the roles of the various participants; (3) provision of adequate resources; (4) provision of timely peer-reviewed information to support the safety program; (5) establishment of general ground rules for the safety review; and (6) agreement on the kinds of information to be provided from the safety review process

  19. Children of War. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities in which students read, analyze, and discuss excerpts from children's war diaries; and create a storyboard for a public service announcement on children's rights in wartime. It includes objectives, materials, procedures, extension activities, excerpts of children's war diaries, suggested readings, and web…

  20. Patient safety: lessons learned

    International Nuclear Information System (INIS)

    Bagian, James P.

    2006-01-01

    The traditional approach to patient safety in health care has ranged from reticence to outward denial of serious flaws. This undermines the otherwise remarkable advances in technology and information that have characterized the specialty of medical practice. In addition, lessons learned in industries outside health care, such as in aviation, provide opportunities for improvements that successfully reduce mishaps and errors while maintaining a standard of excellence. This is precisely the call in medicine prompted by the 1999 Institute of Medicine report ''To Err Is Human: Building a Safer Health System.'' However, to effect these changes, key components of a successful safety system must include: (1) communication, (2) a shift from a posture of reliance on human infallibility (hence ''shame and blame'') to checklists that recognize the contribution of the system and account for human limitations, and (3) a cultivation of non-punitive open and/or de-identified/anonymous reporting of safety concerns, including close calls, in addition to adverse events. (orig.)

  1. Anticipating students' reasoning and planning prompts in structured problem-solving lessons

    Science.gov (United States)

    Vale, Colleen; Widjaja, Wanty; Doig, Brian; Groves, Susie

    2018-02-01

    Structured problem-solving lessons are used to explore mathematical concepts such as pattern and relationships in early algebra, and regularly used in Japanese Lesson Study research lessons. However, enactment of structured problem-solving lessons which involves detailed planning, anticipation of student solutions and orchestration of whole-class discussion of solutions is an ongoing challenge for many teachers. Moreover, primary teachers have limited experience in teaching early algebra or mathematical reasoning actions such as generalising. In this study, the critical factors of enacting the structured problem-solving lessons used in Japanese Lesson Study to elicit and develop primary students' capacity to generalise are explored. Teachers from three primary schools participated in two Japanese Lesson Study teams for this study. The lesson plans and video recordings of teaching and post-lesson discussion of the two research lessons along with students' responses and learning are compared to identify critical factors. The anticipation of students' reasoning together with preparation of supporting and challenging prompts was critical for scaffolding students' capacity to grasp and communicate generality.

  2. The 'Amistad' Case. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    Teaching about the Amistad case provides correlations to the National Standards for History, and Civics and Government. An overview of the events of 1839 is given in this lesson plan. Seven student activities include reading and using primary source documents, writing journal articles, viewing the movie "Amistad," and giving…

  3. Machiavelli's "The Prince." [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Machiavelli's book "The Prince," this lesson plan presents activities designed to help students understand that Machiavelli's enumeration of leadership qualities for a prince has always been controversial; and that leaders and followers may differ in what they identify as the qualities of a good leader. The main activity of the lesson…

  4. "Pride and Prejudice". [Lesson Plan].

    Science.gov (United States)

    Soderquist, Alisa

    Based on Jane Austen's novel "Pride and Prejudice," this lesson plan presents activities designed to help students understand that classics are those pieces of literature that continue to be popular long after they were written; classics tend to have universal themes; and Austen's writing has been updated and dramatized and, most likely, will…

  5. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  6. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    Science.gov (United States)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  7. The impact of curricula and lesson planning in the teaching process

    OpenAIRE

    Majlinda Lika

    2017-01-01

    Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide i...

  8. For Sale: Your Lesson Plans

    Science.gov (United States)

    Greene, Kim

    2016-01-01

    The last several years has seen an increasingly popular trend of teachers buying and selling their lesson plans and other self-created classroom materials in online marketplaces. The leader in this space is a website called Teachers Pay Teachers, which boasts 3.8 million active users. In this article, the author examines why these sites became…

  9. The Great Gatsby. [Lesson Plan].

    Science.gov (United States)

    Zelasko, Ken

    Based on F. Scott Fitzgerald's novel "The Great Gatsby," this lesson plan presents activities designed to help students understand that adapting part of a novel into a dramatic reading makes students more intimate with the author's intentions and craft; and that a part of a novel may lend itself to various oral interpretations. The main activity…

  10. Go West: Imagining the Oregon Trail. [Lesson Plan].

    Science.gov (United States)

    National Endowment for the Humanities (NFAH), Washington, DC.

    In this lesson plan, students in grades 3-5 compare imagined travel experiences of their own with the actual experiences of 19th-century pioneers on the Oregon Trail. After the 4 lessons students will have: (1) learned about the pioneer experience on the Oregon Trail; (2) compared and contrasted modern-day travel experiences with those of the 19th…

  11. Lessons from Fukushima for Improving the Safety of Nuclear Reactors

    Science.gov (United States)

    Lyman, Edwin

    2012-02-01

    The March 2011 accident at the Fukushima Daiichi nuclear power plant has revealed serious vulnerabilities in the design, operation and regulation of nuclear power plants. While some aspects of the accident were plant- and site-specific, others have implications that are broadly applicable to the current generation of nuclear plants in operation around the world. Although many of the details of the accident progression and public health consequences are still unclear, there are a number of lessons that can already be drawn. The accident demonstrated the need at nuclear plants for robust, highly reliable backup power sources capable of functioning for many days in the event of a complete loss of primary off-site and on-site electrical power. It highlighted the importance of detailed planning for severe accident management that realistically evaluates the capabilities of personnel to carry out mitigation operations under extremely hazardous conditions. It showed how emergency plans rooted in the assumption that only one reactor at a multi-unit site would be likely to experience a crisis fail miserably in the event of an accident affecting multiple reactor units simultaneously. It revealed that alternate water injection following a severe accident could be needed for weeks or months, generating large volumes of contaminated water that must be contained. And it reinforced the grim lesson of Chernobyl: that a nuclear reactor accident could lead to widespread radioactive contamination with profound implications for public health, the economy and the environment. While many nations have re-examined their policies regarding nuclear power safety in the months following the accident, it remains to be seen to what extent the world will take the lessons of Fukushima seriously and make meaningful changes in time to avert another, and potentially even worse, nuclear catastrophe.

  12. Iranian EFL Teachers' Attitudes towards Lesson Planning Based on Their Gender

    Science.gov (United States)

    Heidari, Mina; Azizifar, Akbar; Gowhary, Habib; Abbasi, Zahra

    2015-01-01

    The purpose of this study was to examine Iranian EFL teachers' attitudes towards lesson plan based on their gender. The research is a quantitative study in which the data is obtained to get a great understanding on the relationship between lesson plan of Iranian English as Foreign Language (EFL) teachers and teachers' gender. The population…

  13. Most Effective Practices in Lesson Planning

    Science.gov (United States)

    Womack, Sid T.; Pepper, Stephanie; Hanna, Shellie L.; Bell, Columbus David

    2015-01-01

    In a previous study with 130 undergraduate teacher candidates from all licensure levels, data on candidate effectiveness were examined using factor analysis. Four factors were found in effective teaching, those being lesson planning, teacher and student reflection, safe school environment, and teacher professionalism. The present study followed…

  14. From Autopsy to Biopsy: A Metacognitive View of Lesson Planning and Teacher Trainees in ELT

    Science.gov (United States)

    Liyanage, Indika; Bartlett, Brendan John

    2010-01-01

    Lesson planning and implementation of those plans are complex and cognitively demanding for English Language Teacher trainees preparing for the profession. Many find it difficult to develop a lesson holistically and to maintain alignment across aims, procedural steps, and evaluation when planning and implementing a lesson. We attempted to address…

  15. Home Kitchen Safety Lessons for Children and Adults

    OpenAIRE

    Wingfield, Amanda

    2014-01-01

    The purpose of this project was to design a series of lessons introducing food safety concepts and hand washing to children ages three to five, which is a group that is considered an ‘at risk’ population with food safety regards. There are other curriculum that reach this audience, but the intent of this one is to target stay-at-home mothers, whose children are not in preschool. The project goal is to teach the mother and child food safety concepts while simultaneously using hands on cooking ...

  16. Lessons learned from recent safety related incidents at A Canadian uranium conversion facility

    International Nuclear Information System (INIS)

    Jaferi, Jafir

    2013-01-01

    This paper presents the Canadian Nuclear Safety Commission's (CNSC) regulatory requirements for nuclear fuel facility licensees to report any situation or incident that results or is likely to result in a hazard to the health or safety of any person or the environment and to submit its incident investigation report with cause(s) of the incident and corrective actions taken or planned. In addition, the paper presents two recent safety-related incidents that occurred at a uranium conversion facility in Canada along with their consequences, causes, corrective actions and any lessons learned. The first incident resulted in a release of uranium hexafluoride (UF6) inside the UF6 cylinder filling station and the second one resulted in a spill of uranium tetrafluoride (UF 4 ) slurry inside the UF6 plant. Both incidents had no impact on the workers or the environment. (authors)

  17. Transformation of topic-specific professional knowledge into personal pedagogical content knowledge through lesson planning

    Science.gov (United States)

    Stender, Anita; Brückmann, Maja; Neumann, Knut

    2017-08-01

    This study investigates the relationship between two different types of pedagogical content knowledge (PCK): the topic-specific professional knowledge (TSPK) and practical routines, so-called teaching scripts. Based on the Transformation Model of Lesson Planning, we assume that teaching scripts originate from a transformation of TSPK during lesson planning: When planning lessons, teachers use their TSPK to create lesson plans. The implementation of these lesson plans and teachers' reflection upon them lead to their improvement. Gradually, successful lesson plans are mentally stored as teaching scripts and can easily be retrieved during instruction. This process is affected by teacher's beliefs, motivation and self-regulation. In order to examine the influence of TSPK on teaching scripts as well as the moderating effects of beliefs, motivation and self-regulation, we conducted a cross-sectional study with n = 49 in-service teachers in physics. The TSPK, beliefs, motivation, self-regulation and the quality of teaching scripts of in-service teachers were assessed by using an online questionnaire adapted to teaching the force concept and Newton's law for 9th grade instruction. Based on the measurement of the quality of teaching scripts, the results provide evidence that TSPK influences the quality of teaching scripts. Motivation and self-regulation moderate this influence.

  18. Lesson plan profile of senior high school biology teachers in Subang

    Science.gov (United States)

    Rohayati, E.; Diana, S. W.; Priyandoko, D.

    2018-05-01

    Lesson plan have important role for biology teachers in teaching and learning process. The aim of this study was intended to gain an overview of lesson plan of biology teachers’ at Senior High Schools in Subang which were the members of biology teachers association in Subang. The research method was descriptive method. Data was collected from 30 biology teachers. The result of study showed that lesson plan profile in terms of subject’s identity had good category with 83.33 % of average score. Analysis on basic competence in fair category with 74.45 % of average score. The compatibility of method/strategy was in fair category with average score 72.22 %. The compatibility of instrument, media, and learning resources in fair category with 71.11 % of average score. Learning scenario was in good category with 77.00 % of average score. The compatibility of evaluation was in low category with 56.39 % of average score. It can be concluded that biology teachers in Subang were good enough in making lesson plan, however in terms of the compatibility of evaluation needed to be fixed. Furthermore, teachers’ training for biology teachers’ association was recommended to increasing teachers’ skill to be professional teachers.

  19. Planning for Campus Safety

    Science.gov (United States)

    Dessoff, Alan

    2009-01-01

    From natural disasters to criminal violence, facilities officers are often called on to address campus safety and security issues beyond their usual responsibilities. Their experiences in coping with unanticipated events have produced a catalogue of lessons learned that can help them and their peers at other institutions who might face the same…

  20. Safety Requirements / Design Criteria for SFR. Lessons Learned from the Fukushima Dai-ichi Accident

    International Nuclear Information System (INIS)

    Yllera, Javier

    2013-01-01

    After the Fukushima event (March 2011) the IAEA has started an action to review and revise, if necessary, all Safety Standards to take into consideration the lessons learned from the accident. The Safety Standards that need to be revised have been identified. A Prioritization Approach has been established: The first priority is to review safety guides applicable for NPPs and spent fuel storage with focus on the measures for the prevention and mitigation of severe accident due to external hazards - ● Regulatory framework, Safety assessment, Management system, Radiation protection and Emergency Preparedness and response; ● Sitting, Design, Operation of NPPs ● Decommissioning and Waste Management. Original sources for lessons learned: IAE fact Finding Mission, Japan´s report to the Ministerial Conference, INSAG Report, etc. Later, other lesson sources considered

  1. Winter Secrets: An Instant Lesson Plan.

    Science.gov (United States)

    Collyer, Cam

    1997-01-01

    Outdoor lesson plan aims to stimulate student interest in animals' adaptations to winter and the various signs and clues to animal behavior. Includes questions for class discussion, tips for guiding the hike, and instructions for two games that illustrate the predator-prey relationship. Notes curriculum connections to the East York (Ontario) Board…

  2. Twain's "Hannibal." Learning Page Lesson Plan.

    Science.gov (United States)

    Wood, Jan; Thiese, Norma

    Writers are influenced by their environment including family, community, lifestyle, or location. One such writer was Mark Twain. With this lesson plan the learner will become familiar with and analyze life around Mark Twain's hometown, Hannibal, Missouri, during the latter half of the 19th century by using various online and print resources to…

  3. Interrogating the Lesson Plan in a Pre-Service Methods Course: Evidence from a University in Kenya

    Science.gov (United States)

    Simwa, Kefa L.; Modiba, Maropeng

    2015-01-01

    The paper reports on research that examined how the content of a History methods course, taught in a university in Kenya, influenced student teachers' lesson planning and pedagogical skills. A lecture on a lesson plan, micro-teaching lesson plan documents and presentations were examined to determine student teachers' preparedness for teaching the…

  4. The Media and Controlled Substances; Anti-Drug Legislation. Lesson Plans.

    Science.gov (United States)

    Laverdure, Sharon

    1991-01-01

    Provides two lesson plans for classroom use. Focuses on media influence on the use of alcohol and tobacco and on regulatory laws and their effect on drug use. Identifies connections that can be made to textbooks and magazine articles, as well as suggestions for opening, developing, and concluding each lesson. (DK)

  5. Seeking Comfort: How and Why Preservice Teachers Use Internet Resources for Lesson Planning

    Science.gov (United States)

    Sawyer, Amanda G.; Myers, Joy

    2018-01-01

    This study examined 158 lesson plans at one institution across two teacher education programs, inclusive early childhood and elementary education, to determine the impact of Internet usage as inspiration on preservice teachers' lesson plans. Fisher's exact test determined statistically significant differences between the Internet use of preservice…

  6. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  7. No Light at the End of Tunnel Vision: Steps for Improving Lesson Plans

    Science.gov (United States)

    Dunn, Rita; Craig, Martin; Favre, Lois; Markus, Doron; Pedota, Paul; Sookdeo, Gale; Stock, Jessica; Terry, Brian

    2010-01-01

    The authors of this article believe that the current structure of lesson plans impede differentiation, individualization, and innovation and offer little in assessing the quality of teaching and learning. Concrete steps will be offered for planning to better respond to student diversity in meeting lesson objectives. (Contains 1 figure.)

  8. Righting Your Future: LRE Lesson Plans for Today and Tomorrow.

    Science.gov (United States)

    CRADLE: Center for Research and Development in Law-Related Education, Winston-Salem, NC.

    A compilation of more than 50 lesson plans on law related education, these materials were written by middle school and high school teachers from around the United States. The lessons cover a broad range of topics including "DNA Fingerprints and the Constitutional Right to Privacy"; "Censorship and Book Banning in Public Schools"; "The Death…

  9. Lessons learned - development of the tritium facilities 5480.23 safety analysis report and technical safety requirements

    International Nuclear Information System (INIS)

    Cappucci, A.J. Jr.; Bowman, M.E.; Goff, L.

    1997-01-01

    A review was performed which identified open-quotes Lessons Learnedclose quotes from the development of the 5480.23 Tritium Safety Analysis Report (SAR) and the Technical Safety Requirements (TSR) for the Tritium Facilities (TF). The open-quotes Lessons Learnedclose quotes were based on an evaluation of the use of the SRS procedures, processes, and work practices which contributed to the success or lack thereof. This review also identified recommendations and suggestions for improving the development of SARs and TSRs at SRS. The 5480.23 SAR describes the site for the TF, the various process systems in the process buildings, a complete hazards and accident analysis of the most significant hazards affecting the nearby offsite population, and the selection of safety systems, structures, and components to protect both the public and site workers. It also provides descriptions of important programs and processes which add defense in depth to public and worker protection

  10. Post-earthquake building safety inspection: Lessons from the Canterbury, New Zealand, earthquakes

    Science.gov (United States)

    Marshall, J.; Jaiswal, Kishor; Gould, N.; Turner, F.; Lizundia, B.; Barnes, J.

    2013-01-01

    The authors discuss some of the unique aspects and lessons of the New Zealand post-earthquake building safety inspection program that was implemented following the Canterbury earthquake sequence of 2010–2011. The post-event safety assessment program was one of the largest and longest programs undertaken in recent times anywhere in the world. The effort engaged hundreds of engineering professionals throughout the country, and also sought expertise from outside, to perform post-earthquake structural safety inspections of more than 100,000 buildings in the city of Christchurch and the surrounding suburbs. While the building safety inspection procedure implemented was analogous to the ATC 20 program in the United States, many modifications were proposed and implemented in order to assess the large number of buildings that were subjected to strong and variable shaking during a period of two years. This note discusses some of the key aspects of the post-earthquake building safety inspection program and summarizes important lessons that can improve future earthquake response.

  11. Lessons Learned from Implementing National Nuclear Safety Knowledge Platforms

    International Nuclear Information System (INIS)

    Simo, A.

    2016-01-01

    The Integrated Nuclear Security Advisory Services (INSServ) took place in Cameroon from 21st to 25th April 2014 and the Integrated Regulatory Review Service (IRRS) from 12th to 21st October 2014. This was after the government requested the Director General of International Atomic Energy Agency (IAEA) through an official correspondence on 11th June 2013, for these missions. The main objective was to further improve the effectiveness of the Cameroon governmental, legal and regulatory framework for safety and security. Revision of the legal and regulatory framework so that all international safety and security standards are addressed in laws and statutes have been done with documents downloaded from Nuclear portal sites found in GNSSN. Establishment and implementation of integrated management systems by NRPA is being done with documentation under the National Nuclear Portal with lessons learned from the IAEA review missions. The regulatory documents have been uploaded on the platform and can be accessed through FNRBA and NRPA website (www.anrp.cm). UN organizations implementing projects in Cameroon are also linked to the platform. The action plans and progress reports for IAEA/AFRA projects are also available. Moreover, NRPA regulatory activities and licensing sources are available on this platform.

  12. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Science.gov (United States)

    2013-10-03

    ...-0030] RIN 2132-AB20; 2132-AB07 The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... Public Transportation Safety Program (National Safety Program) and the requirements of the new transit...

  13. Organizational safety factors research lessons learned

    International Nuclear Information System (INIS)

    Ryan, T.G.

    1995-01-01

    This Paper reports lessons learned and state of knowledge gained from an organizational factors research activity involving commercial nuclear power plants in the United States, through the end of 1991, as seen by the scientists immediately involved in the research. Lessons learned information was gathered from the research teams and individuals using a question and answer format. The following five questions were submitted to each team and individual: (1) What organizational factors appear to influence safety performance in some systematic way, (2) Should organizational factors research focus at the plant level, or should it extend beyond the plant level to the parent company, rate setting commissions, regulatory agencies, (3) How important is having direct access to plants for doing organizational factors research, (4) What lessons have been learned to date as the result of doing organizational factors research in a nuclear regulatory setting, and (5) What organizational research topics and issues should be pursued in the future? Conclusions based on the responses provided for this report are that organizational factors research can be conducted in a regulatory setting and produce useful results. Technologies pioneered in other academic, commercial, and military settings can be adopted for use in a nuclear regulatory setting. The future success of such research depends upon the cooperation of regulators, contractors, and the nuclear industry

  14. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  15. Planning, managing and organizing the decommissioning of nuclear facilities: Lessons learned

    International Nuclear Information System (INIS)

    2004-05-01

    This publication is intended to encourage the development and improvement of decommissioning planning and management techniques, with the focus on organizational aspects, reduce the duplication of efforts by different parties by transfer of experience and know-how, and provide useful results for those Member States planning or implementing decommissioning projects. In general it can be stated that any decommissioning project can be completed without any deleterious effects on the safety of the workforce and the public or any identifiable impact on the environment. However, timeliness and cost-effectiveness are not always optimal. It has been noted on several occasions that the major weakness in decommissioning projects (as well as in other industrial projects) is often not the lack of technologies, but rather poor planning and management. This publication intends to stimulate awareness of the need for early and efficient planning and to foster developments in management and organization in association with planned or ongoing decommissioning projects. A companion report on Organization and Management for Decommissioning of Large Nuclear Facilities was published by the IAEA in 2000 (Technical Report Series (TRS) No. 399). That TRS provides generic guidance on organizational and management aspects. This TECDOC is complementary to the existing report in that it highlights practical experience - in particular, typical issues, evidence of poor management, undue delays, and lack of timely funding - and distils lessons learned from this experience

  16. Strengthening safety of nuclear power by learning lessons from the accident at TEPCO's Fukushima-Daiichi Nuclear Power Plant

    International Nuclear Information System (INIS)

    Omoto, Akira

    2011-01-01

    The paper first discusses ongoing onsite stabilization activities at Fukushima-Daiichi NPP and a plan for onsite and offsite remedial actions including decontamination and defueling. Four key lessons learned (LL) are raised; safety regulation and safety culture, workable/executable severe accident management procedure, crisis management and design. Global actions for strengthening safety in post-Fukushima era would be built around the IAEA action plan, under recognition of national responsibility. For specific country and plant, a combination of the following may help; a) overall assessment of safety and reflection of Fukushima LL in the light of principles in INSAG-12, b) specific plant assessment of risks from internal, external and security-related events for identifying vulnerabilities and continuous safety improvement, and c) international peer review for comprehensiveness, objectivity and confidence building. In this context, the followings could be worth receiving attention; a) to revisit defense-in-depth, while utilizing risk information, for its completeness and effectiveness (especially, strengthened defense against environmental contamination by effective combination of provisions and management as well as attentiveness and careful attitude towards uncertainties across all layers of defense-in-depth), b) to restore public confidence, c) to cooperate for safety infrastructure in newcomers, d) to build internationally harmonized and cooperative scheme for liability. (author)

  17. Analysis of the CNSC Staffs Action Plan to Reflect Lessons Learned from Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sangkyu; Yune, Young Gill; Ahn, Hyungjoon; Kim, Byungjik; Lee, Jinho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    On September 30, 2011, the Task Force completed its review and presented the public with the findings and recommendations in the CNSC Fukushima Task Force Report. The Task Force made 13 recommendations to further enhance the safety of nuclear power plants in Canada. After that, the CNSC established the CNSC Staffs Action Plan based on the Fukushima Task Force's recommendations. In Canada, 19 nuclear power reactor units are currently producing electric power, and all of them are pressurized heavy water-reactor (PHWR) types. Also, considering 2 power reactor units in Korea, Wolsung unit 1 and 2, are the same reactor type, the analysis of the CNSC Staffs Action Plan will be of benefit to determining recommendations of Korea to address lessons learned from the Fukushima Daiichi nuclear power plant. Therefore, the CNSC Staffs Action Plan was introduced and analyzed in this study. From the results of the above analysis, it is recognized that the strengthening of defense in depth, emergency preparedness and the regulatory oversight of nuclear power plants in Canada were emphasized and much similar to practices of other countries. Public consultation process establishing the CNSC Staffs action plan has been carried out several times, in order to ensure regulatory transparency, by the CNSC staffs, and this is comparable with other countries. It is expected that the detail analysis results of the above plan will be helpful to enhance the safety of domestic operating nuclear power plants.

  18. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  19. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen-sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo-cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  20. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen?sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo?cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  1. Lessons Learned and Regulatory Countermeasures of Nuclear Safety Issues Last Year

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y. E. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    Competitiveness of nuclear as the electric resource in terms of the least cost and the carbon abatement has been debated. Some institutions insist that the radioactive wastes management cost, nuclear accident cost and cheap shale gas would make the nuclear energy less competitive, while others still address the ability of nuclear energy as economical and low-carbon electric resource. This situation reminds that ensuring nuclear safety is the most important prerequisite to use of nuclear energy. Therefore, this paper will compare the different views on future nuclear competitiveness discussed right after the Fukushima accident and summarize the lessons learned and regulatory countermeasures from nuclear safety issues last year. Korea has improved the effectiveness of safety regulation up to now and still has been making efforts on further enhancing nuclear safety. The outcomes of these efforts have resulted in a high level of safety in Korean NPPs and contributing largely to the global nuclear safety through sharing and exchanging the information and knowledge of our nuclear experiences. However, now we are faced with the new challenges such as decreasing the public. Additionally, public criticism of the regulatory activities demands more clear regulatory guides and transparent process. Recently, new president announced the 'Priority to Safety and Public Trust' as the precondition to utilize the nuclear energy. We will continue to make much more efforts for the improvement of the quality of regulatory activities and effectiveness of regulatory decision making process than we have done so far. Competence through effective capacity building would be a helpful pathway to build up the public trust and ensure the acceptable level of nuclear safety. We are set to prepare the action items to be taken in the near future for improving the technical competency and transparency as the essential components of the national safety and will make efforts to implement them

  2. Collaborative Lesson Planning as Professional Development for Beginning Primary Teachers

    Science.gov (United States)

    Bauml, Michelle

    2014-01-01

    This qualitative case study describes how one beginning primary grade teacher benefited from collaborative lesson-planning meetings with her grade-level colleagues. The teacher accumulated knowledge of curriculum, pedagogy, and professional contexts as she participated in planning meetings each week during her first year of teaching. Furthermore,…

  3. 29 CFR 1915.502 - Fire safety plan.

    Science.gov (United States)

    2010-07-01

    ... implement a written fire safety plan that covers all the actions that employers and employees must take to ensure employee safety in the event of a fire. (See Appendix A to this subpart for a Model Fire Safety... safety plan for their employees, and this plan must comply with the host employer's fire safety plan. ...

  4. Using Activity Theory to Examine How Teachers' Lesson Plans Meet Students' Learning Needs

    Science.gov (United States)

    Chizhik, Estella Williams; Chizhik, Alexander Williams

    2018-01-01

    How is lesson planning useful? This research study used Cultural Historical Activity Theory and intersubjectivity to answer this questions. This research explored to what extent teacher candidates' lesson plans (i.e., alignment among objectives, assessment, and instruction), and analyses of assessment data mediate their thinking about students'…

  5. Aviation Safety Risk Modeling: Lessons Learned From Multiple Knowledge Elicitation Sessions

    Science.gov (United States)

    Luxhoj, J. T.; Ancel, E.; Green, L. L.; Shih, A. T.; Jones, S. M.; Reveley, M. S.

    2014-01-01

    Aviation safety risk modeling has elements of both art and science. In a complex domain, such as the National Airspace System (NAS), it is essential that knowledge elicitation (KE) sessions with domain experts be performed to facilitate the making of plausible inferences about the possible impacts of future technologies and procedures. This study discusses lessons learned throughout the multiple KE sessions held with domain experts to construct probabilistic safety risk models for a Loss of Control Accident Framework (LOCAF), FLightdeck Automation Problems (FLAP), and Runway Incursion (RI) mishap scenarios. The intent of these safety risk models is to support a portfolio analysis of NASA's Aviation Safety Program (AvSP). These models use the flexible, probabilistic approach of Bayesian Belief Networks (BBNs) and influence diagrams to model the complex interactions of aviation system risk factors. Each KE session had a different set of experts with diverse expertise, such as pilot, air traffic controller, certification, and/or human factors knowledge that was elicited to construct a composite, systems-level risk model. There were numerous "lessons learned" from these KE sessions that deal with behavioral aggregation, conditional probability modeling, object-oriented construction, interpretation of the safety risk results, and model verification/validation that are presented in this paper.

  6. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  7. "1984": How Much Fact in Fiction? [Lesson Plan].

    Science.gov (United States)

    Hedberg, Betsy

    Based on George Orwell's novel "1984," this lesson plan presents activities designed to help students understand that the historical context of the novel is based on the mood and political climate of 1949 Europe; the society Orwell created and modern society in the United States have similarities and differences; and modern privacy issues and the…

  8. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  9. Text Linguistics in Research Papers Prepared by University Students: Teaching through Lesson Plans and Textbooks

    Directory of Open Access Journals (Sweden)

    Manuel Albarrán-Santiago

    2015-01-01

    Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach.  The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education.  According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing.  Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes.  In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.

  10. BiteScis: Connecting K-12 teachers with science graduate students to produce lesson plans on modern science research

    Science.gov (United States)

    Battersby, Cara

    2016-01-01

    Many students graduate high school having never learned about the process and people behind modern science research. The BiteScis program addresses this gap by providing easily implemented lesson plans that incorporate the whos, whats, and hows of today's scienctific discoveries. We bring together practicing scientists (motivated graduate students from the selective communicating science conference, ComSciCon) with K-12 science teachers to produce, review, and disseminate K-12 lesson plans based on modern science research. These lesson plans vary in topic from environmental science to neurobiology to astrophysics, and involve a range of activities from laboratory exercises to art projects, debates, or group discussion. An integral component of the program is a series of short, "bite-size" articles on modern science research written for K-12 students. The "bite-size" articles and lesson plans will be made freely available online in an easily searchable web interface that includes association with a variety of curriculum standards. This ongoing program is in its first year with about 15 lesson plans produced to date.

  11. The effectiveness of Concept Mapping Content Representation Lesson Study (ComCoReLS) model to improve skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher

    Science.gov (United States)

    Purwaningsih, E.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.

  12. General Mechanical Repair. Minor Automotive Maintenance, Small Engine [Repair, and] Welding: Curriculum Guide and Lesson Plans.

    Science.gov (United States)

    Hamlin, Larry

    This document contains a curriculum guide and lesson plans for a general mechanical repair course with three sections: minor automotive maintenance, small engine repair, and welding. The curriculum guide begins with a matrix that relates the lesson plans to essential elements of math, science, language arts, and social studies and to Texas…

  13. Key regulatory and safety issues emerging NEA activities. Lessons Learned from Fukushima Dai-ichi NPS Accident - Key Regulatory and Safety Issues

    International Nuclear Information System (INIS)

    Nakoski, John

    2013-01-01

    A presentation was provided on the key safety and regulatory issues and an update of activities undertaken by the NEA and its members in response to the accident at the Fukushima Daiichi nuclear power stations (NPS) on 11 March 2011. An overview of the accident sequence and the consequences was provided that identified the safety functions that were lost (electrical power, core cooling, and primary containment) that lead to units 1, 2, and 3 being in severe accident conditions with large off-site releases. Key areas identified for which activities of the NEA and member countries are in progress include accident management; defence-in-depth; crisis communication; initiating events; operating experience; deterministic and probabilistic assessments; regulatory infrastructure; radiological protection and public health; and decontamination and recovery. For each of these areas, a brief description of the on-going and planned NEA activities was provided within the three standing technical committees of the NEA with safety and regulatory mandates (the Committee on Nuclear Regulatory Activities - CNRA, the Committee on the Safety of Nuclear Installations - CSNI, and the Committee on Radiation Protection and Public Health - CRPPH). On-going activities of CNRA include a review of enhancement being made to the regulatory aspects for the oversight of on-site accident management strategies and processes in light of the lessons learned from the accident; providing guidance to regulators on crisis communication; and supporting the peer review of the safety assessments of risk-significant research reactor facilities in light of the accident. Within the scope of the CSNI mandate, activities are being undertaken to better understand accident progression; characteristics of new fuel designs; and a benchmarking study of fast-running software for estimating source term under severe accident conditions to support protective measure recommendations. CSNI also has ongoing work in human

  14. Five Years after the Fukushima Daiichi Accident: Nuclear Safety Improvements and Lessons Learnt

    International Nuclear Information System (INIS)

    Magwood, William D. IV; Niel, Jean-Christophe; Fuketa, Toyoshi; Sheron, Brian; Boyd, Michael; McGarry, Ann; Dussart-Desart, Roland; Reig, Javier; Hah, Yeonhee; Nieh, Ho; Vasquez-Maignan, Ximena; Salgado, Nancy; White, Andrew; Lazo, Edward; Creswell, Len; Leeds, Eric; Gannon-Picot, Cynthia; Griffiths, Janice

    2016-01-01

    Countries around the world continue to implement safety improvements and corrective actions based on lessons learnt from the 11 March 2011 accident at the Fukushima Daiichi nuclear power plant. This report provides a high-level summary and update on these activities, and outlines further lessons learnt and challenges identified for future consideration. It focuses on actions taken by NEA committees and NEA member countries, and as such is complementary to reports produced by other international organisations. It is in a spirit of openness and transparency that NEA member countries share this information to illustrate that appropriate actions are being taken to maintain and enhance the level of safety at their nuclear facilities. Nuclear power plants are safer today because of these actions. High-priority follow-on items identified by NEA committees are provided to assist countries in continuously benchmarking and improving their nuclear safety practices. (authors)

  15. "Split" Character Studies in "Crime and Punishment." [Lesson Plan].

    Science.gov (United States)

    O'Brien, Mary

    Based on Fyodor Dostoevsky's novel "Crime and Punishment," this lesson plan presents activities designed to help students understand that: a close study of the characters of a literary classic will yield important clues to an understanding of the work as a whole; an effective analysis of stylistic devices depends upon selection and interpretation…

  16. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    Science.gov (United States)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  17. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Maskin, Mazleha [Korea Advanced Institute for Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  18. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    International Nuclear Information System (INIS)

    Maskin, Mazleha; Choi, Kwang Sik

    2010-01-01

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  19. U. S. Department of energy actions to ensure nuclear safety at its nuclear facilities in response to lessons being learned from the Fukushima dacha accident

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Dae; O' Brien, James [U. S. Department of Energy, Washington (United States)

    2012-03-15

    The U. S. Department of Energy (DOE) has established a rigorous nuclear safety regulatory infrastructure for the protection of workers, the public, and the environment. An essential part of this infrastructure is a safety culture that promotes organizational learning and includes a commitment to safety by senior leaders that is demonstrated through their actions and behaviors. The tragic Fukushima Dacha accident presented an important challenge for DOE leaders to demonstrate a robust safety culture by critically examining the Department' s regulatory infrastructure and its implementation to ensure that appropriate safety provisions were in place. This paper discusses the actions DOE has taken to date in this regard and further planned action to ensure safety at DOE facilities in light of lessons being learned from the Fukushima Dacha accident.

  20. U. S. Department of energy actions to ensure nuclear safety at its nuclear facilities in response to lessons being learned from the Fukushima dacha accident

    International Nuclear Information System (INIS)

    Chung, Dae; O'Brien, James

    2012-01-01

    The U. S. Department of Energy (DOE) has established a rigorous nuclear safety regulatory infrastructure for the protection of workers, the public, and the environment. An essential part of this infrastructure is a safety culture that promotes organizational learning and includes a commitment to safety by senior leaders that is demonstrated through their actions and behaviors. The tragic Fukushima Dacha accident presented an important challenge for DOE leaders to demonstrate a robust safety culture by critically examining the Department' s regulatory infrastructure and its implementation to ensure that appropriate safety provisions were in place. This paper discusses the actions DOE has taken to date in this regard and further planned action to ensure safety at DOE facilities in light of lessons being learned from the Fukushima Dacha accident

  1. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  2. 49 Stories That Make an Ultimate STEM Lesson Plan

    Science.gov (United States)

    Mehta, Swati; Mehta, Rohit; Berzina-Pitcher, Inese; Seals, Christopher; Mishra, Punya

    2016-01-01

    In this paper we reviewed what 49 large urban public school district STEM teachers enrolled in a year-long graduate certificate and fellowship program at a large Midwestern university considered as their amazing teaching moments. They were asked to share their amazing teaching moments that would make an Ultimate Lesson Plan in STEM. In smaller…

  3. Comparison of plant-specific probabilistic safety assessments and lessons learned

    International Nuclear Information System (INIS)

    Balfanz, H.P.; Berg, H.P.; Steininger, U.

    2001-01-01

    Probabilistic safety assessments (PSA) have been performed for all German nuclear power plants in operation. These assessments are mainly based on the recent German PSA guide and an earlier draft, respectively. However, comparison of these PSA show differences in the results which are discussed in this paper. Lessons learned from this comparison and further development of the PSA methodology are described. (orig.) [de

  4. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  5. Outline of the Fukushima Daiichi Accident. Lessons Learned and Safety Enhancements

    Directory of Open Access Journals (Sweden)

    Hirano Masashi

    2017-01-01

    This paper briefly presents the outline of the Fukushima Daiichi accident and summarizes the major lessons learned having been drawn and safety enhancements having been done in Japan for the purpose of giving inputs to the discussions to be taken place in the Special Invited Session “Fukushima, 5 years after”.

  6. Learning Lessons from TMI to Fukushima and Other Industrial Accidents: Keys for Assessing Safety Management Practices

    International Nuclear Information System (INIS)

    Dechy, N.; Rousseau, J.-M.; Dien, Y.; Montmayeul, R.; Llory, M.

    2016-01-01

    The main objective of the paper is to discuss and to argue about transfer, from an industrial sector to another industrial sector, of lessons learnt from accidents. It will be achieved through the discussion of some theoretical foundations and through the illustration of examples of application cases in assessment of safety management practices in Nuclear Power Plant (NPP). The nuclear energy production industry has faced three big ones in 30 years (TMI, Chernobyl, Fukushima) involving three different reactor technologies operated in three quite different cultural, organizational and regulatory contexts. Each of those accident has been the origin of questions, but also generator of lessons, some changing the worldview (see Wilpert and Fahlbruch, 1998) of what does cause an accident in addition to the engineering view about the importance of technical failures (human error, safety culture, sociotechnical interactions). Some of their main lessons were implemented such as improvements of human-machine interfaces ergonomics, recast of some emergency operating procedures, severe accident mitigation strategies and crisis management. Some lessons did not really provide deep changes. It is the case for organizational lessons such as, organizational complexity, management of production pressures, regulatory capture, and failure to learn, etc.

  7. The Use of Lesson Study Combined with Content Representation in the Planning of Physics Lessons During Field Practice to Develop Pedagogical Content Knowledge

    Science.gov (United States)

    Juhler, Martin Vogt

    2016-08-01

    Recent research, both internationally and in Norway, has clearly expressed concerns about missing connections between subject-matter knowledge, pedagogical competence and real-life practice in schools. This study addresses this problem within the domain of field practice in teacher education, studying pre-service teachers' planning of a Physics lesson. Two means of intervention were introduced. The first was lesson study, which is a method for planning, carrying out and reflecting on a research lesson in detail with a learner and content-centered focus. This was used in combination with a second means, content representations, which is a systematic tool that connects overall teaching aims with pedagogical prompts. Changes in teaching were assessed through the construct of pedagogical content knowledge (PCK). A deductive coding analysis was carried out for this purpose. Transcripts of pre-service teachers' planning of a Physics lesson were coded into four main PCK categories, which were thereafter divided into 16 PCK sub-categories. The results showed that the intervention affected the pre-service teachers' potential to start developing PCK. First, they focused much more on categories concerning the learners. Second, they focused far more uniformly in all of the four main categories comprising PCK. Consequently, these differences could affect their potential to start developing PCK.

  8. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  9. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  10. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  11. Chemical Hygiene and Safety Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  12. Lessons Learned for Space Safety from the Fukushima Nuclear Power Plant Accident

    Science.gov (United States)

    Nogami, Manami; Miki, Masami; Mitsui, Masami; Kawada, Ysuhiro; Takeuchi, Nobuo

    2013-09-01

    On March 11 2011, Tohoku Region Pacific Coast Earthquake hit Japan and caused the devastating damage. The Fukushima Nuclear Power Station (NPS) was also severely damaged.The Japanese NPSs are designed based on the detailed safety requirements and have multiple-folds of hazard controls to the catastrophic hazards as in space system. However, according to the initial information from the Tokyo Electric Power Company (TEPCO) and the Japanese government, the larger-than-expected tsunami and subsequent events lost the all hazard controls to the release of radioactive materials.At the 5th IAASS, Lessons Learned from this disaster was reported [1] mainly based on the "Report of the Japanese Government to the IAEA Ministerial Conference on Nuclear Safety" [2] published by Nuclear Emergency Response Headquarters in June 2011, three months after the earthquake.Up to 2012 summer, the major investigation boards, including the Japanese Diet, the Japanese Cabinet and TEPCO, published their final reports, in which detailed causes of this accident and several recommendations are assessed from each perspective.In this paper, the authors examine to introduce the lessons learned to be applied to the space safety as findings from these reports.

  13. The Planning of Teaching in the Context of Lesson Study: Research Findings

    Science.gov (United States)

    Kanellopoulou, Eurydice-Maria; Darra, Maria

    2018-01-01

    The main purpose of the present study is to examine the attitudes, perceptions and experiences of the teachers participating in the planning of teaching in the context of the Lesson Study. The present work, which is part of a wider research effort, followed a mixed methodological planning for reasons of triangulation. The survey was conducted from…

  14. Supporting Pre-Service Teachers in Designing Technology-Infused Lesson Plans

    Science.gov (United States)

    Janssen, N.; Lazonder, A. W.

    2016-01-01

    The present study compared the effectiveness of two types of just-in-time support for lesson planning. Both types contained the same technological information but differed regarding pedagogical and content information. The first type presented this information separately (i.e., separate support); the second type presented this information in an…

  15. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  16. Capacity building in the IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Caruso, Gustavo

    2014-01-01

    Conclusion and Future Challenges: • Momentum on Nuclear Safety; • To continue strengthening, developing, maintaining and implementing capacity building programmes, including education, training and exercises at the national, regional and international levels; • To ensure sufficient and competent human resources necessary to assume responsibility for safety; • To incorporate lessons learned from the accident based on the IEMs and IAEA Fukushima Report

  17. Lessons Learnt in the Development of Level 1 PUSPATI TRIGA Reactor Probability Safety Assessment: A Collaboration Project under the Norwegian Extra Budgetary Fund

    International Nuclear Information System (INIS)

    Mazleha Maskin; Tom, P.P.; Ahmad Hassan Sallehudin Mohd Sarif; Faizal Mohamed; Mohd Fazli Zakaria; Muhamad Puad Abu

    2014-01-01

    This article reports about the lessons learnt from the development of level 1 probabilistic safety assessment (PSA) project that was implemented under the IAEA mentoring program for TRIGA MARK II PUSPATI research reactor (RTP). As a project that involved more than 3 organizations, a strategic planning of the management and implementation of individual assignment is truly a hectic task. This report compiles all related activities from the forming of the Malaysian PSA team up to the final report submitted to the IAEA. (author)

  18. Lessons learned from the shut down, planning, and the preparatory activities of decommissioning the research reactor VVR-S Magurele, Bucharest

    International Nuclear Information System (INIS)

    Dragusin, M.; Copaciu, V.

    2006-01-01

    The nuclear research reactor type VVR was shut down in December 1997 after forty years of operation. The main characteristics of this reactor are: Thermal power 2 MW, Thermal energy - 9.59 GWhd, Average flux of thermal neutrons-10 13 n/cm 2 .s, nine horizontal channels, sixteen vertical exposure channels, three biological channels, reactor type tank, water used as a moderator, coolant and reflector. The reactor was used in research and radioisotope production. The reactor has been permanently shut down since April 2002, when the decommissioning was officially announced. Discussions regarding funding mechanisms for the conservation phase, and decommissioning (planning, preparatory activities, spent nuclear fuel management), have taken place since five years ago when the final decision of permanent shut down was taken. Quality management includes procedures for recording and archiving the lessons learned. The planning of decommissioning started in 1990 when the reactor was still operational. After fifteen years the regulatory body has not yet approved the decommissioning plan for the reactor. In this paper the following aspects are discussed: decommissioning strategy from safe enclosure to immediate dismantling, specific features of the site (treatment of radioactive waste near reactor) and state of decommissioning, use of the lessons learned in the planning of decommissioning for the other two small nuclear facilities situated in the same area with VVR-reactor: Sub critical Assembly 'HELEN' and Zero Power Critical Reactor RP-0, AFR ponds for spent nuclear fuel, other radiological facilities for radioisotopes production facilities radiation processing and accelerators. Preparatory activities for decommissioning have included: elaboration of a plan (inter alia, justification of the selected strategy, management of the radioactive waste in accordance with the waste acceptance criteria), reactor storage in parallel with the removal of the equipment and materials used in

  19. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  20. Treating Social Anxiety in Adolescents: Ten Group Therapy Lesson Plans

    Science.gov (United States)

    Mazur-Elmer, Alison; McBride, Dawn

    2009-01-01

    This project provides a comprehensive overview of the research literature on social anxiety disorder (SAD) in adolescents and concludes by offering a set of 10 group therapy lesson plans for SAD that therapists can use in their practice. The overview includes a description of social anxiety disorder and highlights various theories of anxiety. The…

  1. Figuring Somepin 'bout the Great Depression. Learning Page Lesson Plan.

    Science.gov (United States)

    McElroy, Amy; Pietsch, Chris

    These 10th and 11th grade lessons plans related to the Great Depression and the novel "The Grapes of Wrath" help students to: develop research skills and strategies, such as keyword searches, for finding information; recognize and use the different voices of migrants; and understand the politics of migration and the Great Depression. By…

  2. The attitudinal and cognitive effects of interdisciplinary collaboration on elementary pre-service teachers development of biological science related lesson plans

    Science.gov (United States)

    Mills, Jada Jamerson

    There is a need for STEM (science, technology, engineering, and mathematics) education to be taught effectively in elementary schools. In order to achieve this, teacher preparation programs should graduate confident, content strong teachers to convey knowledge to elementary students. This study used interdisciplinary collaboration between the School of Education and the College of Liberal Arts through a Learning-by-Teaching method (LdL): Lernen durch Lernen in German. Pre-service teacher (PST) achievement levels of understanding science concepts based on pretest and posttest data, quality of lesson plans developed, and enjoyment of the class based on the collaboration with science students. The PSTs enrolled in two treatment sections of EDEL 404: Science in the Elementary Classroom collaborated with science students enrolled in BISC 327: Introductory Neuroscience to enhance their science skills and create case-based lesson plans on neurothology topics: echolocation, electrosensory reception, steroid hormones, and vocal learning. The PSTs enrolled in the single control section of EDEL 404 collaborated with fellow elementary education majors to develop lesson plans also based on the same selected topics. Qualitative interviews of education faculty, science faculty, and PSTs provided depth to the quantitative findings. Upon lesson plan completion, in-service teachers also graded the two best and two worst plans for the treatment and control sections and a science reviewer graded the plans for scientific accuracy. Statistical analyses were conducted for hypotheses, and one significant hypothesis found that PSTs who collaborated with science students had more positive science lesson plan writing attitudes than those who did not. Despite overall insignificant statistical analyses, all PSTs responded as more confident after collaboration. Additionally, interviews provided meaning and understanding to the insignificant statistical results as well as scientific accuracy of

  3. The Education and Lifestyle of the Chinese Literati. Lesson Plan.

    Science.gov (United States)

    Smithsonian Institution, Washington, DC. Arthur M. Sackler Gallery.

    This teaching package describes the education and lifestyle of the Chinese literati, popular from the Ming to the Qing dynasties (1368-1911). It consists of four lesson plans and a teacher's guide to a slide set. The latter illustrates painting formats popular during the late Ming period (1573-1644), hanging scrolls, handscrolls, the album leaf,…

  4. Planning lessons with learning platforms - problem and prospects for mathematics education

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    2018-01-01

    is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  5. Reflective Lesson Planning in Refresher Training Programs for Experienced Physics Teachers.

    Science.gov (United States)

    Chung, C. M.; And Others

    1995-01-01

    Reports on a refresher training program that introduces experienced physics teachers to a reflective lesson-planning model and a more constructivist approach to physics teaching. Three instructional strategies developed by participants in the program and the corresponding suggestions made by their peers are presented and analyzed. (29 references)…

  6. Institutionalizing planning, enactment and reflection of daily lessons through appropriate organizational restructuring

    NARCIS (Netherlands)

    Raval, Harini; McKenney, Susan; Pieters, Julius Marie

    2011-01-01

    This study describes a professional development program aimed at supporting para-teachers in an Indian educational NGO to adopt learner-centered approaches. Organizational factors inhibiting para-teacher learning were modified. A routine of lesson planning before, and reflection after daily

  7. The Date That Lives in Infamy: Pearl Harbor Lesson Plans.

    Science.gov (United States)

    Department of the Navy, Washington, DC.

    This lesson plan can help teachers and students understand what happened on December 7, 1941, beginning with the first U.S. treaty with Japan in 1854 through the attacks in 1941. Students use primary sources to synthesize information and draw conclusions about the role of the U.S. Navy in foreign policy and to understand how people in 1941 reacted…

  8. Understanding public sexual harassment : lesson plans and session guidance, key Stages 3 & 4.

    OpenAIRE

    Vera-Gray, F.; Bullough, J.

    2017-01-01

    These lesson plans have been written by Dr. Fiona Vera-Gray at Durham University and Jayne Bullough from Rape Crisis South London (RASASC). They were created through a partnership project with Doll’s Eye Theatre, Purple Drum, RASASC, Dr. Maria Garner, and Dr. Fiona Vera-Gray. Lessons on public sexual harassment were drawn from the work of Dr. Vera-Gray at Durham University. The project was made possible by Durham Law School’s Impact Acceleration Grant from the Economics and ...

  9. Strategic Program Planning Lessons Learned in Developing the LTS S&T Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Duane Hanson; Brent Dixon; Gretchen Matthern

    2003-07-01

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy’s Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  10. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  11. The Construction and Pilot Application of a Scoring Rubric for Creative Drama Lesson Planning

    Science.gov (United States)

    Korkut, Perihan

    2018-01-01

    Instructional planning is an important part of successful teaching. Therefore, quality lesson planning is accepted as an important indicator of teacher knowledge and ability. This is no different for creative drama. Although drama is strongly rooted in the participating group's creativity and spontaneity, its success depends on a careful and…

  12. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  13. Supporting Elementary Education in-Service Teachers' Proficiency in Planning STEM-Centric Lessons

    Science.gov (United States)

    Bowers, Sharon W.

    The purpose of this study was to explore the McDaniel College Elementary STEM Instructional Leader (ESIL) pilot cohort's ability to proficiently plan lessons that incorporated the Maryland State STEM Standards of Practice (SOP), targeting integration of STEM content, inquiry learning, students' abilities to collaborate as a STEM team and students' strategic application of technology. Data collection, in the form of reviewing and analyzing study participants' lesson plans and self-reflections, was completed by three independent assessors. The researcher examined the interrater reliability among the three assessors using the Fleiss' kappa statistic. A 0.91 proportion of agreement consensus was documented among the three assessors. A test of hypothetical value was conducted using the nonparametric Wilcoxonsigned- rank Test. Interpretation of the Wilcoxon-signed-rank Test results suggest that the sample population demonstrated proficient planning abilities for the four targeted Maryland State STEM SOP. Findings from this research add to the field's knowledge of elements in the promotion of graduate coursework that leads to elementary in-service teachers' proficiency in planning STEM-centric lessons, however the findings also have broader implications for teacher education at large. The McDaniel College ESIL model could frame K-12 teacher education for both preservice and in-service teachers. The pragmatic, hybrid experience maximizes flexibility, promotes analytical thinking and self-reflection and builds communication skills. The introduction and development of inquiry and design-based learning through the 7E Learning Cycle develops the teachers' understanding of practices promoted not only within the Maryland State STEM SOP, but also within the Next Generation Science Standards. The McDaniel College ESIL model also builds upon the collective efforts of academia, a non-profit STEM research facility, and local school divisions to align efforts that may lead to

  14. Tobacco Use Prevention Education. K-12 Lesson Plans from the Montana Model Curriculum for Health Enhancement.

    Science.gov (United States)

    Montana State Office of Public Instruction, Helena.

    This publication presents K-12 tobacco use prevention lesson plans for schools in the state of Montana. Lessons for students in grades K-6 include: family connections; body tracing; smokeless tobacco; prenatal development; tobacco look-alikes; tobacco chemicals; analyzing tobacco and alcohol ads; tobacco use and the lungs; and a personal health…

  15. Leading in crisis: lessons for safety leaders.

    Science.gov (United States)

    George, William W; Denham, Charles R; Burgess, L Hayley; Angood, Peter B; Keohane, Carol

    2010-03-01

    The National Quality Forum (NQF) Safe Practices are a group of 34 evidence-based Safe Practices that should be universally used to reduce the risk of harm to patients. Four of these practices specifically address leadership. A recently published book, 7 Lessons for Leading in Crisis, offers practical advice on how to lead in crisis. An analysis of how concepts from the 7 lessons could be applied to the Safe Practices was presented nationally by webinar to assess the audience's reaction to the information. The objective of this article was to present the information and the audience's reaction to it. Recommendations for direct actions that health care leaders can take to accelerate adoption of NQF Safe Practices were presented to health care leaders, followed by an immediate direct survey that used Reichheld's "Net Promoter Score" to assess whether the concepts presented were considered applicable and valuable to the audience. In a separate presentation, the challenges and crises facing nursing leaders were addressed by nursing leaders. Six hundred seventy-four hospitals, with an average of 4.5 participants per hospital, participated in the webinar. A total of 272 safety leaders responded to a survey immediately after the webinar. A Net Promoter Score assessment revealed that 58% of those surveyed rated the value of the information at 10, and 91% scored the value of the webinar to be between 8 and 10, where 10 is considered a strong recommendation that those voting would recommend this program to others. The overwhelmingly high score indicated that the principles presented were important and valuable to this national audience of health care leadership. The 2010 environment of uncertainty and shrinking financial resources poses significant risk to patients and new challenges for leaders at all levels. A values-grounded focus on personal accountability for leading in crisis situations strongly resonates with those interested in or leading patient safety initiatives.

  16. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  17. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  18. OCRWM [Office of Civilian Radioactive Waste Management] Safety Plan

    International Nuclear Information System (INIS)

    1986-12-01

    The OCRWM Safety Plan sets forth management policies and general requirements for the safety of the public and of personnel associated with the Civilian Radioactive Waste Management Program (hereinafter called the ''Program''). It is applicable to all individuals and organizational elements of the Program, including all facilities and activities controlled by the Program pursuant to the Act, and to all phases of the Program. The plan defines the responsibilities assigned by the Director of the OCRWM to the various OCRWM line organizations, and to the contractors and the projects. It discusses the means by which safety policies and requirements will be communicated, and summarizes the applicable DOE Orders, and the procedures for reviewing, reporting, and evaluating safety problems. In addition, the OCRWM Safety Plan addresses DOE Orders applicable to occupational health and safety, worker protection, and public health and safety. OCRWM believes that it has an equally high level of commitment to both public safety and worker safety. The Plan also summarizes applicable NRC criteria and regulations that will be imposed through the formal licensing proceedings. While the Safety Plan sets forth OCRWM policy, it is not intended to be prescriptive in the details of implementation. Each OCRWM program element must develop and control its own set of detailed requirements for the protection of its workers and the public based on the principles set forth herein

  19. Implementing and measuring safety goals and safety culture. 2. Extensive Efforts to Learn Lessons from Overseas Nuclear Power Plants

    International Nuclear Information System (INIS)

    Maki, Nobuo

    2001-01-01

    1992. The missions of INSS are to raise the safety and reliability level of NPPs and to achieve harmony with society and the environment in the areas of technology, human engineering, and social science. For these missions, INSS is conducting research from a broad perspective, developing policies, and offering guidance to Japanese utilities. The research results are published to contribute to the growth and development of nuclear power generation. INSS consists of two institutes: the Institute of Social Research and the Institute of Nuclear Technology. The Institute of Social Research has three projects: the Human Factor Research project, Social Awareness Research project, and Energy Issue Research project. The Institute of Nuclear Technology has four projects: the Nuclear Power Information project, Abnormal Occurrence Prevention project, Material Aging project, and Technical Support project. The Nuclear Power Information project has an important role to provide Japanese utilities with lessons learned on NPP safety. Event reports from INPO, WANO, and the U.S. Nuclear Regulatory Commission are analyzed by the project. The event information and the analyzed results are accumulated in Nuclear Information Database. The number of the events stored in the database over the past 6 yr is more than 22 000. Recently, the database has been improved to offer a Web-based interface. In the evaluation of gas accumulation in safety injection system piping of pressurized water reactors (PWRs) performed by the project, it was clarified that gas accumulation in piping between the safety injection tank and residual heat removal system should be quantitatively investigated regarding Japanese PWRs. The cause of the event is coolant leakage to the interfacing system with lower pressure and gas dissolution of primary coolant by the pressure drop. The gas inspection method using UT was demonstrated at MTC and planned to be applied to actual KEPCO plants. INSS is providing Japanese utilities

  20. The safety problems of the nuclear power. The lessons of Chernobyl

    International Nuclear Information System (INIS)

    Prister, B.S.; Klyuchnikov, A.A.; Shestopalov, V.M.; Kukhar', V.P.

    2013-01-01

    The problems of nuclear safety as a complex system are considered. It is shown that the reliability and safety of a nuclear power plant determined does not only reliable structures of the main equipment and qualification of the staff, but especially strict compliance with the priorities of the Security over the economic, political and other factors. Failure to observe this principle has become a real cause of several accidents in the global nuclear power industry, accompanied by the release of radionuclides into the environment. The lessons of Chernobyl remain unlearned, what confirmed the accident at the Fukushima-1 in Japan. The most important of these is the readiness to respond and protect the public, not only from radiation, but also from a psychological stress. For specialists in the field of nuclear and radiation safety, radiobiology, ecology, environment, agriculture, graduates and university students

  1. Beyond the Playing Field: Jackie Robinson, Civil Rights Advocate. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    This packet provides primary source documents and lesson plans relating to the study of Jackie Robinson as a civil rights advocate. The legendary baseball player, Jack Roosevelt Robinson, was the first black man to "officially" play in the big leagues in the 20th century. Jackie Robinson was not only a stellar baseball player, but he…

  2. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  3. Experiences and lessons learned for planning and supply of micronutrient powders interventions

    Science.gov (United States)

    Schauer, Claudia; Sunley, Nigel; Nyhus Dhillon, Christina; Roca, Claudia; Tapia, Gustavo; Mathema, Pragya; Walton, Shelley; Situma, Ruth; Zlotkin, Stanley; DW Klemm, Rolf

    2017-01-01

    Abstract Realistic planning for a nutrition intervention is a critical component of implementation, yet effective approaches have been poorly documented. Under the auspices of “The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance,” 3 working groups were formed to summarize experiences and lessons across countries regarding micronutrient powders (MNP) interventions for young children. This paper focuses on programmatic experiences in the planning stages of an MNP intervention, encompassing assessment, enabling environment and adaptation, as well as considerations for supply. Methods included a review of published and grey literature, key informant interviews, and deliberations throughout the consultation process. We found that assessments helped justify adopting an MNP intervention, but these assessments were often limited by their narrow scope and inadequate data. Establishing coordinating bodies and integrating MNP into existing policies and programmes have helped foster an enabling environment and support programme stability. Formative research and pilots have been used to adapt MNP interventions to specific contexts, but they have been insufficient to inform scale‐up. In terms of supply, most countries have opted to procure MNP through international suppliers, but this still requires understanding and navigating the local regulatory environment at the earliest stages of an intervention. Overall, these findings indicate that although some key planning and supply activities are generally undertaken, improvements are needed to plan for effective scale‐up. Much still needs to be learned on MNP planning, and we propose a set of research questions that require further investigation. PMID:28960875

  4. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  5. Integrating safety and health during deactiviation: With lessons learned from PUREX

    International Nuclear Information System (INIS)

    1995-01-01

    This report summarizes an integrated safety and health approach used during facility deactivation activities at the Department of Energy (DOE) Plutonium-Uranium Extraction (PUREX) Facility in Hanford, Washington. Resulting safety and health improvements and the potential, complex-wide application of this approach are discussed in this report through a description of its components and the impacts, or lessons-learned, of its use during the PUREX deactivation project. As a means of developing and implementing the integrated safety and health approach, the PUREX technical partnership was established in 1993 among the Office of Environment, Safety and Health's Office of Worker Health and Safety (EH-5); the Office of Environmental Management's Offices of Nuclear Material and Facility Stabilization (EM-60) and Compliance and Program Coordination (EM-20); the DOE Richland Operations Office; and the Westinghouse Hanford Company. It is believed that this report will provide guidance for instituting an integrated safety and health approach not only for deactivation activities, but for decommissioning and other clean-up activities as well. This confidence is based largely upon the rationality of the approach, often termed as common sense, and the measurable safety and health and project performance results that application of the approach produced during actual deactivation work at the PUREX Facility

  6. Science and Math Lesson Plans to Meet the Ohio Revised Science Standards and the Next Generation of Standards for Today; Technology (Excel

    Directory of Open Access Journals (Sweden)

    Suzanne Lunsford

    2015-02-01

    Full Text Available Pre-service teachers (K-12 developed and taught lesson plans that met the state and national science and technology standards by integrating Excel and PowerPoint into their lesson. A sample of 74 pre-service teachers in our science education program were required to integrate technology (Excel as they developed science and math lesson plans with graphing as a requirement. These students took pre-test and post-test (n=74 to determine their understanding of Excel in relation to the need of current technology for todays' science classroom. The test results showed that students obtained content gains in Excel graphing in all the inquiry-based lab experiments. They also gained experience in developing math skills, inquiry-based science lesson plans, and communication and presentation skills.

  7. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2018-06-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  8. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2017-04-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  9. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  10. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  11. Lesson Plans for "Not for Ourselves Alone: The Story of Elizabeth Cady Stanton and Susan B. Anthony."

    Science.gov (United States)

    Prososki, Lisa; Krouse, Judith; Harper, Judith E.

    These lesson plans for high school students were developed to accompany the documentary film by Ken Burns and Paul Barnes which tells the story of Elizabeth Cady Stanton and Susan B. Anthony and their lifelong fight for women's rights. In the lessons students write editorials about women's rights around the world today, interview senior citizens…

  12. Provider-Sponsored Health Plans: Lessons Learned over Three Decades.

    Science.gov (United States)

    Breon, Richard C

    2016-01-01

    Healthcare's movement to value-based care is causing health systems across the country to consider whether owning or partnering with a health plan could benefit their organizations. Although organizations have different reasons for wanting to enter the insurance business, potential benefits include improving care quality, lowering costs, managing population health, expanding geographic reach, and diversifying the organization's revenue stream. However, the challenges and risks of owning a health plan are formidable: Assuming 100 percent financial risk for a patient population requires considerable financial resources, as well as competencies that are wholly different from those needed to run a hospital or physician group. For Spectrum Health, an integrated, not-for-profit health system based in Grand Rapids, Michigan, owning a health plan has been vital to fulfilling its mission of improving the health of the communities it serves, as well as its value proposition of providing highquality care at lower costs. This article weighs the pros and cons of operating a health plan; explores key business factors and required competencies that organizations need to consider when deciding whether to buy, build, or partner; examines the current environment for provider-sponsored health plans; and shares some of the lessons Spectrum Health has learned over three decades of running its health plan, Priority Health.

  13. "The State of Chihuahua", Lesson Plan for "Cultural Unit: Focus on Mexico."

    Science.gov (United States)

    Llewellyn, Marianne

    This lesson plan was designed for students in Montana schools. The objectives for this culture unit are having: (1) students recognize the similarities between their home stat of Montana and the Mexican state of Chihuahua; (2) students learn about features unique to Chihuahua; and (3) students create an advertising brochure marketing Chihuahua to…

  14. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  15. Chemical and nuclear emergencies: Interchanging lessons learned from planning and accident experience

    International Nuclear Information System (INIS)

    Adler, V.; Sorensen, J.H.; Rogers, G.O.

    1989-01-01

    Because the goal of emergency preparedness for both chemical and nuclear hazards is to reduce human exposure to hazardous materials, this paper examines the interchange of lessons learned from emergency planning and accident experience in both industries. While the concerns are slightly different, sufficient similarity is found for each to draw implications from the others experience. Principally the chemical industry can learn from the dominant planning experience associated with nuclear power plants, while the nuclear industry can chiefly learn from the chemical industry's accident experience. 23 refs

  16. Observations and lessons learnt from more than a decade of water safety planning in South-East Asia.

    Science.gov (United States)

    Sutherland, David

    2017-09-01

    In many countries of the World Health Organization (WHO) South-East Asia Region, drinking water is not used directly from the tap and faecal contamination of water sources is prevalent. As reflected in Sustainable Development Goal 6, access to safer drinking water is one of the most successful ways of preventing disease. The WHO Water Safety Framework promotes the use of water safety plans (WSPs), which are structured tools that help identify and mitigate potential risks throughout a water-supply system, from the water source to the point of use. WSPs not only help prevent outbreaks of acute and chronic waterborne diseases but also improve water-supply management and performance. During the past 12 years, through the direct and indirect work of a water quality partnership supported by the Australian Government, more than 5000 urban and rural WSPs have been implemented in the region. An impact assessment based on pre- and post-WSP surveys suggests that WSPs have improved system operations and management, infrastructure and performance; leveraged donor funds; increased stakeholder communication and collaboration; increased testing of water quality; and increased monitoring of consumer satisfaction. These achievements, and their sustainability, are being achieved through national legislation and regulatory frameworks for water supply, including quality standards for drinking water; national training tools and extensive training of sector professionals and creation of WSP experts; model WSPs; WSP auditing systems; and the institution of longterm training and support. More than a decade of water safety planning using the WSP approach has shown that supplying safe drinking water at the tap throughout the WHO South-East Asia Region is a realistic goal.

  17. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  18. Inadequacies of Belgium nuclear emergency plans: lessons from the Fukushima catastrophe have not been learned

    International Nuclear Information System (INIS)

    Boilley, David; Josset, Mylene

    2015-01-01

    After having outlined that some Belgium regional authorities made some statements showing that they did not learn lessons neither from the Chernobyl catastrophe, nor from the Fukushima accident, this report aims at examining whether Belgium is well prepared to face a severe nuclear accident occurring within its borders or in neighbouring countries, whether all hypotheses have actually been taken into account, and whether existing emergency plans are realistic. After a presentation of Belgium's situation regarding nuclear plants (Belgium plants and neighbouring French plants), the report presents the content and organisation of the nuclear emergency plan for the Belgium territory at the national, provincial and municipal levels. While outlining inadequacies and weaknesses of the Belgium plan regarding the addressed issues, it discusses the main lessons learned from the Fukushima accident in terms of emergency planning areas, of population sheltering, of iodine-based prophylaxis, of population evacuation, of food supply, of tools (measurement instruments) and human resources, and of public information. In the next parts, the report addresses and discusses trans-border issues, and the commitment of stakeholders

  19. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  20. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  1. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  2. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  3. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  4. Nuclear fuel cycle facilities, laboratories, irradiators, particle accelerators, under-decommissioning reactors and radioactive waste management facilities safety. Lessons learned from events notified between 2005 and 2008

    International Nuclear Information System (INIS)

    2001-01-01

    and abroad. This part - which makes no claims to be exhaustive - aims to illustrate the Institute's analysis of the significant events brought to its knowledge, using concrete representative scenarios. - the final section (chapter 7) presents a cross-disciplinary analysis of notified events, under two complementary angles (analysis of types of event and analysis of generic causes), to make general lessons available. The Institute plans to provide this type of analysis report periodically in future years, in order to present a regular update on trends noted and areas for improvement with the overall goal of encouraging on-going enhancement of facility safety. (authors)

  5. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  6. Nuclear power safety

    International Nuclear Information System (INIS)

    1988-01-01

    The International Atomic Energy Agency, the organization concerned with worldwide nuclear safety has produced two international conventions to provide (1) prompt notification of nuclear accidents and (2) procedures to facilitate mutual assistance during an emergency. IAEA has also expanded operational safety review team missions, enhanced information exchange on operational safety events at nuclear power plants, and planned a review of its nuclear safety standards to ensure that they include the lessons learned from the Chernobyl nuclear plant accident. However, there appears to be a nearly unanimous belief among IAEA members that may attempt to impose international safety standards verified by an international inspection program would infringe on national sovereignty. Although several Western European countries have proposed establishing binding safety standards and inspections, no specific plant have been made; IAEA's member states are unlikely to adopt such standards and an inspection program

  7. Statement to Second Extraordinary Meeting of Contracting Parties to Convention on Nuclear Safety, 27 August 2012, Vienna, Austria

    International Nuclear Information System (INIS)

    Amano, Y.

    2012-01-01

    Full Text: I am pleased to address this Second Extraordinary Meeting of the Contracting Parties to the Convention on Nuclear Safety. This important meeting will be closely watched by the global nuclear community. I know you will make good use of this opportunity to consider further measures to strengthen nuclear safety throughout the world in the light of the lessons which we are still learning from the Fukushima Daiichi accident. One year after the adoption of the IAEA Action Plan on Nuclear Safety, significant progress has been made in several key areas. These include the assessment of safety vulnerabilities of nuclear power plants, strengthening IAEA peer review services, improving emergency preparedness and response capabilities and reviewing IAEA safety standards. Your work this week will address the request to Contracting Parties, expressed in the Action Plan, to explore mechanisms to enhance the effective implementation of Safety Conventions and to consider proposals to amend the Convention on Nuclear Safety. You will recall that last year's Ministerial Declaration stressed 'the importance of universal adherence to, and the effective implementation and continuous review of, the relevant international instruments on nuclear safety'. The Action Plan encouraged Member States to work cooperatively to maximize the lessons learned from the Fukushima Daiichi accident and to produce concrete results as soon as possible. The IAEA has reported periodically to Member States about its work to implement the Action Plan. We have also organised a number of international expert meetings to analyse technical aspects of the accident and ensure that the right lessons are learned. The results of this Extraordinary Meeting will provide an important input to future considerations of implementation of the Action Plan. Our Member States will review implementation at the Agency's 56th General Conference next month, while the Fukushima Ministerial Conference on Nuclear Safety in

  8. Safety culture in nuclear installations: Bangladesh perspectives and key lessons learned from major events

    International Nuclear Information System (INIS)

    Jalil, A.; Rabbani, G.

    2002-01-01

    Steps necessary to be taken to ensure safety in nuclear installations are suggested. One of the steps suggested is enhancing the safety culture. It is necessary to gain a common understanding of the concept itself, the development stages of safety culture by way of good management practices and leadership for safety culture improvement in the long-term. International topical meetings on safety culture may serve as an important forum for exchange of experiences. From such conventions new initiatives and programmes may crop up which when implemented around the world is very likely to improve safety management and thus boost up the safety culture in nuclear installations. International co-operation and learning are to be prompted to facilitate the sharing of the achievements to face the challenges involved in the management of safety and fixing priorities for future work and identify areas of co-operations. Key lessons learned from some major events have been reported. Present status and future trend of nuclear safety culture in Bangladesh have been dealt with. (author)

  9. Learning with and about Advertising in Chemistry Education with a Lesson Plan on Natural Cosmetics--A Case Study

    Science.gov (United States)

    Belova, Nadja; Eilks, Ingo

    2015-01-01

    This paper describes a case study on the chemistry behind natural cosmetics in five chemistry learning groups (grades 7-11, age range 13-17) in a German comprehensive school. The lesson plan intends to promote critical media literacy in the chemistry classroom and specifically emphasizes learning with and about advertising. The lessons of four…

  10. French PWR safety philosophy

    International Nuclear Information System (INIS)

    Conte, M.

    1986-05-01

    Increasing knowledge and lessons learned from starting and operating experience of French nuclear power plants, completed by the experience learned from the operation of foreign reactors, has contributed to the improvement of French PWR design and safety philosophy. Based on a deterministic approach, the French safety analysis was progressively completed by a probabilistic approach, each of them having possibilities and limits. As a consequence of the global risk objective set in 1977 for nuclear reactors, safety analysis was extended to the evaluation of events more complex than the conventional ones, and later to the evaluation of the feasibility of the offsite emergency plans in case of severe accidents

  11. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  12. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  13. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  14. French PWR Safety Philosophy

    International Nuclear Information System (INIS)

    Conte, M. M.

    1986-01-01

    The first 900 MWe units, built under the American Westinghouse licence and with reference to the U. S. regulation, were followed by 28 standardized units, C P1 and C P2 series. Increasing knowledge and lessons learned from starting and operating experience of French nuclear power plants, completed by the experience learned from the operation of foreign reactors, has contributed to the improvement of French PWR design and safety philosophy. As early as 1976, this experience was taken into account by French Safety organisms to discuss, with Electricite de France, the safety options for the planned 1300 MWe units, P4 and P4 series. In 1983, the new reactor scheduled, Ni4 series 1400 MWe, is a totally French design which satisfies the French regulations and other French standards and codes. Based on a deterministic approach, the French safety analysis was progressively completed by a probabilistic approach each of them having possibilities and limits. Increasing knowledge and lessons learned from operating experience have contributed to the French safety philosophy improvement. The methodology now applied to safety evaluation develops a new facet of the in depth defense concept by taking highly unlikely events into consideration, by developing the search of safety consistency of the design, and by completing the deterministic approach by the probabilistic one

  15. Generating a city's first report on bicyclist safety: lessons from the field.

    Science.gov (United States)

    Lopez, Dahianna S; Hemenway, David

    2017-08-03

    For cities aiming to create a useful surveillance system for bicycle injuries, a common challenge is that city crash reporting is scattered, faulty or non-existent. We document some of the lessons we learnt in helping the city of Boston, Massachusetts, USA, do the following: (1) Create a prototype for a comprehensive police crash data set (2) Produce the city's first cyclist safety report, (3) Make crash data available to the public and (4) Generate policy recommendations for both specific roadside improvements and for sustainable changes to the police department's crash reporting database. We provided research and technical assistance to government partners to generate the report and used participant-observation field notes to generate the list of learnt lessons. After the release of the report, the city implemented immediate activities aimed at making an effort to prevent injuries, including: (1) Furnishing over 1800 taxis with stickers to prevent 'dooring,' (2) Adding pavement markings at trolley tracks to decrease the likelihood that cyclists would fall from getting their wheels lodged in the tracks, (3) Conducting targeted enforcement of traffic laws and (4) Working directly with state and federal agencies to fund a more comprehensive surveillance system. As of January of 2017, nearly 4 years after its public release, 19 170 users have viewed the crash data set 23 247 times. Some of the lessons include finding and using committed champions, prioritising the use of existing data, creating opportunities to bridge divisions between stakeholders, partnering with local universities for assistance with advanced analytics and using deliverables, such as a cyclist safety report, to advocate for sustainability. Providing an initial report on bicycle crashes in Boston served to identify specific problems, showed the value of a data system, and provided a blueprint for an improved data system. Building a useful surveillance system depends in no small part on the

  16. Literacy Models and the Reconstruction of History Education: A Comparative Discourse Analysis of Two Lesson Plans

    Science.gov (United States)

    Collin, Ross; Reich, Gabriel A.

    2015-01-01

    This article presents discourse analyses of two lesson plans designed for secondary school history classes. Although the plans focus on the same topic, they rely on different models of content area literacy: disciplinary literacy, or reading and writing like experts in a given domain, and critical literacy, or reading and writing to address…

  17. 12 CFR 308.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... time within which those steps will be taken. (c) Review of safety and soundness compliance plans... PRACTICE RULES OF PRACTICE AND PROCEDURE Submission and Review of Safety and Soundness Compliance Plans and... compliance plan. (a) Schedule for filing compliance plan—(1) In general. A bank shall file a written safety...

  18. Operation of TRR-1/M1 for 25 years and lessons learned in management of safety and safety culture

    International Nuclear Information System (INIS)

    Keinmeesuke, Sirichai

    2002-01-01

    The first Thai Research Reactor, TRR-1, was installed and put into operation in 1962. In 1975 the reactor was converted to a 2 MW TRIGA Mark III by replacing of the reactor core and the control system. The renamed TRR-1/M1 research reactor went critical again in November 1977. TRR-1/M1 has been operated safely for 25 years with its main utilization in research, isotope production and training. Safety management and safety culture have been implemented for 25 years both in the legislation level and the operation level. There was no nuclear incident and there were a few radiological incidents during the 25 years of operation of TRR-1/M1. The lessons learned from the incident events such as the release of N-16 and Ar-41, the release of radioactive Bromine gave valued opportunities to improve our operation procedure, safety procedure and safety culture. All type of activities with respect to safety culture such as individual awareness, commitment, motivation, supervision and responsibility have been seriously reviewed and being set as normal practices. (author)

  19. Safety Culture: Lessons Learned from the US Chemical Safety and Hazard Investigations Board

    International Nuclear Information System (INIS)

    Griffon, M.

    2016-01-01

    investigate the Macondo incident, it became clear that there were similarities with the BP Texas City situation. In 2014 the CSB released two other investigation reports, Tesoro, Anacortes,WA and Chevron, Richmond, CA, which noted deficient safety cultures as contributing to the incidents. The on-going trend of a great deal of focus on personal safety and a lack of adequate focus on process safety was recently discussed in a DNV-GL report. DNV-GL, an international oil and gas technical consulting group, concluded that personal injury rates in offshore oil and gas operations have shown a ten-fold magnitude of improvement. The report concluded that the available data for looking at process safety in the last five years shows no unified global trend toward improved performance. This presentation will examine the lessons learned from the CSBs investigations regarding safety management systems and safety culture as contributing factors to some major incidents in the oil and gas and chemical industrial sectors. (author)

  20. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  1. Health Care Consumerism: Lessons My 401(k) Plan Taught Me.

    Science.gov (United States)

    Steinberg, Allen T

    2015-01-01

    Changes to the U.S. health care system are here. As we think about how individuals will pay for health care--while actively employed and while retired--our experiences with 401(k) plans provide some valuable lessons. In order to support employees in this new health care world--a challenge arguably more daunting than the 401(k) challenge we faced 20 years ago--some very different types of support are needed. Employers should consider providing their employees with the resources to manage health care changes.

  2. Outline of the Fukushima Daiichi Accident. Lessons Learned and Safety Enhancements

    Science.gov (United States)

    Hirano, Masashi

    2017-09-01

    Abstract. On March 11, 2011, an earthquake and subsequent tsunamis off the Pacific coastline of Japan's Tohoku region caused widespread devastation in Japan. As of June 10, 2016, it is reported that a total of 15,894 people lost their lives and 2,558 people are still unaccounted for. In Fukushima Prefecture, approximately 100,000 people are still obliged to live away from their homes due to the earthquake and tsunami as well as the Fukushima Daiichi accident. On the day, the earthquake and tsunami caused severe damages to the Tokyo Electric Power Company (TEPCO)'s Fukushima Daiichi Nuclear Power Station (NPS). All the units in operation, namely Units 1 to 3, were automatically shut down on seismic reactor protection system trips but the earthquake led to the loss of all off-site electrical power supplies to that site. The subsequent tsunami inundated the site up to 4 to 5 m above its ground level and caused, in the end, the loss of core cooling function in Units 1 to 3, resulting in severe core damages and containment vessel failures in these three units. Hydrogen was released from the containment vessels, leading to explosions in the reactor buildings of Units 1, 3 and 4. Radioactive materials were released to the atmosphere and were deposited on the land and in the ocean. One of the most important lessons learned is an importance to prevent such large scale common cause failures due to extreme natural events. This leads to a conclusion that application of the defense-in-depth philosophy be enhanced because the defense-in-depth philosophy has been and continues to be an effective way to account for uncertainties associated with risks. From the human and organizational viewpoints, the final report from the Investigation Committee of the Government pointed out so-called "safety myth" that existed among nuclear operators including TEPCO as well as the government, that serious severe accidents could never occur in nuclear power plants in Japan. After the accident, the

  3. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  4. Designing Innovative Lessons Plans to Support the Next Generation Science Standards (NGSS)

    Science.gov (United States)

    Passow, M. J.

    2013-12-01

    The Next Generation Science Standards (NGSS) issued earlier in 2013 provide the opportunity to enhance pre-college curricula through a new focus on the ';Big Ideas' in Science, more attention to reading and writing skills needed for college and career readiness, and incorporation of engineering and technology. We introduce a set of lesson plans about scientific ocean drilling which can serve as a exemplars for developing curricula to meet NGSS approaches. Designed for middle and high school students, these can also be utilized in undergraduate courses. Development of these lessons was supported through a grant from the Deep Earth Academy of the Consortium for Ocean Leadership. They will be disseminated through websites of the Deep Earth Academy (http://www.oceanleadership.org/education/deep-earth-academy/) and Earth2Class Workshops for Teachers (http://www.earth2class.org), as well as through workshops at science education conferences sponsored by the National Earth Science Teachers Association (www.nestanet.org) and other organizations. Topics include 'Downhole Logging,' 'Age of the Ocean Floors,' 'Tales of the Resolution,' and 'Continental Shelf Sediments and Climate Change Patterns.' 'Downhole Logging' focuses on the engineering and technology utilized to obtain more information about sediments and rocks cored by the JOIDES Resolution scientific drilling vessel. 'Age of the Ocean Floor' incorporates the GeoMap App visualization tools (http://www.geomapapp.org/) to compare sea bottom materials in various parts of the world. 'Tales of the Resolution' is a series of ';graphic novels' created to describe the scientific discoveries, refitting of the JOIDES Resolution, and variety of careers available in the marine sciences (http://www.ldeo.columbia.edu/BRG/outreach/media/tales/). The fourth lesson focuses on discoveries made during Integrated Ocean Drilling Program Expedition 313, which investigated patterns in the sediments beneath the continental shelf off New

  5. From resilience thinking to Resilience Planning: Lessons from practice.

    Science.gov (United States)

    Sellberg, M M; Ryan, P; Borgström, S T; Norström, A V; Peterson, G D

    2018-07-01

    Resilience thinking has frequently been proposed as an alternative to conventional natural resource management, but there are few studies of its applications in real-world settings. To address this gap, we synthesized experiences from practitioners that have applied a resilience thinking approach to strategic planning, called Resilience Planning, in regional natural resource management organizations in Australia. This case represents one of the most extensive and long-term applications of resilience thinking in the world today. We conducted semi-structured interviews with Resilience Planning practitioners from nine organizations and reviewed strategic planning documents to investigate: 1) the key contributions of the approach to their existing strategic planning, and 2) what enabled and hindered the practitioners in applying and embedding the new approach in their organizations. Our results reveal that Resilience Planning contributed to developing a social-ecological systems perspective, more adaptive and collaborative approaches to planning, and that it clarified management goals of desirable resource conditions. Applying Resilience Planning required translating resilience thinking to practice in each unique circumstance, while simultaneously creating support among staff, and engaging external actors. Embedding Resilience Planning within organizations implied starting and maintaining longer-term change processes that required sustained multi-level organizational support. We conclude by identifying four lessons for successfully applying and embedding resilience practice in an organization: 1) to connect internal "entrepreneurs" to "interpreters" and "networkers" who work across organizations, 2) to assess the opportunity context for resilience practice, 3) to ensure that resilience practice is a learning process that engages internal and external actors, and 4) to develop reflective strategies for managing complexity and uncertainty. Copyright © 2018 The Authors

  6. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  7. Culturally Responsive Education: Developing Lesson Plans for Vietnamese Students in the American Diaspora

    Science.gov (United States)

    Douglas, Cynthia M.

    2015-01-01

    This article focuses on the application of the philosophical principles of John Dewey and Culturally Responsive Education in the creation of lesson plans for Vietnamese students in the American Diaspora. Through a Fulbright-Hayes Program a group of teachers from the New York City Public School System and Long Island spent six weeks in Vietnam…

  8. EC6 safety enhancement - including impact of Fukushima lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Zemdegs, R.; Boyle, S.; Soulard, M., E-mail: stephen.yu@candu.com [Candu Energy Inc., Mississauga, Ontario (Canada)

    2012-09-15

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date regulatory requirements and customer expectations. EC6 builds on the proven high performance design inch as the Qinshan CANDU 6 units and has made improvements to safety and operational performance, and has incorporated extensive operational feedback including Fukushima. The Fukushima Dai-ichi March 11, 2011 event has demonstrated the importance of defence-in-depth considerations for beyond-design basis events, including severe accidents. The EC6 design is based on the defence-in-depth principles and provides further design features that address the lessons learned from Fukushima. (author)

  9. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  10. A Relevant Lesson: Hitler Goes to the Mall

    Science.gov (United States)

    Gerwin, David

    2003-01-01

    A "Motivation" eliciting the "Aim" of each lesson initiates each lesson in the orthodox "developmental lesson-plan" that has dominated classroom instruction in NYC public schools for at least the past half-century. An action-research study of 38 lesson-plans (over 5 each from 5 teachers) drawn from student-teaching…

  11. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  12. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  13. Creating more effective health plan quality reports for consumers: lessons from a synthesis of qualitative testing.

    Science.gov (United States)

    Harris-Kojetin, L D; McCormack, L A; Jaël, E F; Sangl, J A; Garfinkel, S A

    2001-07-01

    Social marketing techniques such as consumer testing have only recently been applied to develop effective consumer health insurance information. This article discusses lessons learned from consumer testing to create consumer plan choice materials. Data were collected from 268 publicly and privately insured consumers in three studies between 1994 and 1999. Iterative testing and revisions were conducted to design seven booklets to help Medicaid, Medicare, and employed consumers choose a health plan. Standardized protocols were used in 11 focus groups and 182 interviews to examine the content, comprehension, navigation, and utility of the booklets. A method is suggested to help consumers narrow their plan choices by breaking down the process into smaller decisions using a set of guided worksheets. Implementing these lessons is challenging and not often done well. This article gives examples of evidence-based approaches to address cognitive barriers that designers of consumer health insurance information can adapt to their needs.

  14. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  15. Safety design criteria for the next generation Sodium-cooled fast reactors based on lessons learned from the Fukushima NPS accident

    International Nuclear Information System (INIS)

    Sakai, Takaaki

    2012-01-01

    In this presentation, architecture of the safety design criteria as requirements for SFR system and the activities on safety research works to establish safety evaluation methods for the next generation SFRs are summarized with the basis on lessons learned from the Fukushima NPS accident. Nuclear safety is a grovel issue which should be achieved by the international cooperation. In respect of the development for the next generation reactor, it is necessary to build the harmonized safety criteria and evaluation methods to establish the next level of safety

  16. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  17. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  18. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  19. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  20. Regulatory analysis and lessons learned from the LLRW [low-level radioactive waste] disposal area at West Valley, New York: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The New York State Energy Research and Development Authority has sponsored a project to develop an integrated set of site management plans for the West Valley low-level radioactive waste (LLRW) disposal area. The plans were directed to upgrade the disposal area so that passive custodial care and monitoring activities would be sufficient to protect public health and safety and the environment. Tasks 5 and 6, Regulatory Analysis and Lessons Learned, are the subject of this report. The regulatory analysis identified areas of inconsistencies between the historic site operations and the current state and federal LLRW disposal regulations and guidelines. The lessons learned task identified the causes of the disposal problems at West Valley, discussed the lessons learned, and described the responses developed by the NRC and industry to the lessons learned. 85 refs., 6 figs., 19 tabs

  1. Strategic Program Planning Lessons Learned In Developing The Long-Term Stewardship Science and Technology Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, B.W.; Hanson, D.J.; Matthern, G.E.

    2003-04-24

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy's Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  2. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  3. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  4. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  5. A Lesson about the Circular Flow. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Landfried, Janet

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a lesson description; appropriate grade level; economic concepts; content standards and benchmarks; related subjects; instructional objectives; time…

  6. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  7. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  8. Insight and Lessons Learned on Organizational Factors and Safety Culture from the Review of Human Error-related Events of NPPs in Korea

    International Nuclear Information System (INIS)

    Kim, Ji Tae; Lee, Dhong Hoon; Choi, Young Sung

    2014-01-01

    Event investigation is one of the key means of enhancing nuclear safety deriving effective measures and preventing recurrences. However, it is difficult to analyze organizational factors and safety culture. This paper tries to review human error-related events from perspectives of organizational factors and safety culture, and to derive insights and lessons learned in developing the regulatory infrastructure of plant oversight on safety culture

  9. Insight and Lessons Learned on Organizational Factors and Safety Culture from the Review of Human Error-related Events of NPPs in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ji Tae; Lee, Dhong Hoon; Choi, Young Sung [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-08-15

    Event investigation is one of the key means of enhancing nuclear safety deriving effective measures and preventing recurrences. However, it is difficult to analyze organizational factors and safety culture. This paper tries to review human error-related events from perspectives of organizational factors and safety culture, and to derive insights and lessons learned in developing the regulatory infrastructure of plant oversight on safety culture.

  10. Validation and verification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V ampersand V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements

  11. Research-Based Development of a Lesson Plan on Shower Gels and Musk Fragrances Following a Socio-Critical and Problem-Oriented Approach to Chemistry Teaching

    Science.gov (United States)

    Marks, Ralf; Eilks, Ingo

    2010-01-01

    A case is described of the development of a lesson plan for 10th grade (age range 15-16) chemistry classes on the chemistry of shower gels. The lesson plan follows a socio-critical and problem-oriented approach to chemistry teaching. This means that, aside from learning about the basic chemistry of the components making up modern shower gels in…

  12. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  13. Examining the Effect of Lesson Study on Prospective Primary Teachers’ Knowledge of Lesson Planning [Ders İmecesinin Sınıf Öğretmeni Adaylarının Matematik Dersini Planlama Bilgilerine Etkisinin İncelenmesi

    Directory of Open Access Journals (Sweden)

    Müjgan Baki

    2015-08-01

    Full Text Available This article reflects a special part of a research conducted to examine the effect of lesson study on prospective classroom teachers’ mathematical pedagogical content knowledge (MPCK. In this article, the special part consists of prospective teachers’ knowledge of lesson planning including a mastery of planning an affective lesson taking into account student’s current knowledge, understanding and difficulties within mathematics. Therefore, the research question is how lesson study practices affect prospective classroom teachers’ knowledge of lesson planning as a sub component of MPCK. The research is conducted with 12 prospective classroom teachers, six of them have already assisted to lesson study and the others have not. Data collection tools consist of video records, class observations, field notes, interviews and lesson plans prepared and used by prospective teachers participated in lesson study. Findings indicated that the prospective classroom teachers who participated in lesson study improved their knowledge in terms of planning an affective lesson taking student’s current knowledge and understanding into consideration. They appeared to be aware of selecting and ordering appropriate activities related to the actual objectives of the mathematical topics. They also appeared to be better in lesson organization and lesson presentation comparing to the other group of prospective teachers who did not participated in lesson study. [Bu makale, Öğretmenlik Uygulaması derslerinde uygulanan ders imecesi modelinin sınıf öğretmeni adaylarının alanı öğretme bilgilerine etkisini izlemek amacıyla yapılan bir araştırmanın bir bölümünü yansıtmaktadır. Makalede alanı öğretme bilgisinin alt bileşenlerinden olan öğrenme-öğretme sürecini planlama boyutuna odaklanılarak ‘Ders imecesi uygulaması, sınıf öğretmeni adaylarının öğrenme öğretme sürecini planlama bilgilerinin gelişimini nasıl etkilemektedir

  14. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  15. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  16. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  17. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    Gould, J.

    1999-01-01

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  18. [Economics] Introductory Lesson (Begin Day One). Lesson Plan.

    Science.gov (United States)

    Lewin, Roland

    This introductory lesson on teaching economics concepts contains sections on the following: purpose; objectives; time; materials needed; and step-by-step classroom procedures. The focus is on the economic problem of scarcity and opportunity costs. Attached is an original skit, "There's no such thing as a free lunch," and a chart that…

  19. 12 CFR 30.4 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...

  20. Lessons learned from accidents investigations

    Energy Technology Data Exchange (ETDEWEB)

    Zuniga-Bello, P. [Consejo Nacional de Ciencia y Tecnologia (CONACYT), Mexico City (Mexico); Croft, J. [National Radiological Protection Board (United Kingdom); Glenn, J

    1997-12-31

    Accidents from three main practices: medical applications, industrial radiography and industrial irradiators are used to illustrate some common causes of accidents and the main lessons to be learned. A brief description of some of these accidents is given. Lessons learned from the described accidents are approached by subjects covering: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  1. Lessons learned from accident investigations

    International Nuclear Information System (INIS)

    Zuniga-Bello, P.; Croft, J.R.; Glenn, J.

    1998-01-01

    Accidents in three main practices - medical applications, industrial radiography and industrial irradiators - are used to illustrate some common causes of accidents and the main lessons to be learned from them. A brief description of some of these accidents is given. Lessons learned from the accidents described are approached bearing in mind: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  2. International R&M/Safety Cooperation Lessons Learned Between NASA and JAXA

    Science.gov (United States)

    Fernandez, Rene; Havenhill, Maria T.; Zampino, Edward J.; Kiefer, Dwayne E.

    2013-01-01

    Presented are a number of important experiences gained and lessons learned from the collaboration of the National Aeronautics and Space Administration (NASA) and the Japanese Aerospace Exploration Agency (JAXA) on the CoNNeCT (Communications, Navigation, and Networking re-Configurable Testbed) project. Both space agencies worked on the CoNNeCT Project to design, assemble, test, integrate, and launch a communications testbed facility mounted onto the International Space Station (ISS) truss. At the 2012 RAMS, two papers about CoNNeCT were presented: one on Ground Support Equipment Reliability & System Safety, and the other one on combined application of System Safety & Reliability for the flight system. In addition to the logistics challenges present when two organizations are on the opposite side of the world, there is also a language barrier. The language barrier encompasses not only the different alphabet, it encompasses the social interactions; these were addressed by techniques presented in the paper. The differences in interpretation and application of Spaceflight Requirements will be discussed in this paper. Although many, but definitely not all, of JAXA's Spaceflight Requirements were inspired by NASA, there were significant and critically important differences in how they were interpreted and applied. This paper intends to summarize which practices worked and which did not for an international collaborative effort so that future missions may benefit from our experiences. The CoNNeCT flight system has been successfully assembled, integrated, tested, shipped, launched and installed on the ISS without incident. This demonstrates that the steps taken to facilitate international understanding, communication, and coordination were successful and warrant discussion as lessons learned.

  3. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  4. KHNP Safety Culture Framework based on Global Standard, and Lessons learned from Safety Culture Evaluation

    International Nuclear Information System (INIS)

    Kim, Younggab; Hur, Nam Young; Jeong, Hyeon Jong

    2015-01-01

    In order to eliminate the vague fears of the people about the nuclear power and operate continuously NPPs, a strong safety culture of NPPs should be demonstrated. Strong safety culture awareness of workers can overcome social distrust about NPPs. KHNP has been a variety efforts to improve and establish safety culture of NPPs. Safety culture framework applying global standards was set up and safety culture assessment has been carried out periodically to enhance safety culture of workers. In addition, KHNP developed various safety culture contents and they are being used in NPPs by workers. As a result of these efforts, safety culture awareness of workers is changed positively and the safety environment of NPPs is expected to be improved. KHNP makes an effort to solve areas for improvement derived from safety culture assessment. However, there are some areas to take a long time in completing the work. Therefore, these actions are necessary to be carried out consistently and continuously. KHNP also developed recently safety culture enhancement system based on web. All information related to safety culture in KHNP will be shared through this web system and this system will be used to safety culture assessment. In addition to, KHNP plans to develop safety culture indicators for monitoring the symptoms of safety culture weakening

  5. KHNP Safety Culture Framework based on Global Standard, and Lessons learned from Safety Culture Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Younggab; Hur, Nam Young; Jeong, Hyeon Jong [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    In order to eliminate the vague fears of the people about the nuclear power and operate continuously NPPs, a strong safety culture of NPPs should be demonstrated. Strong safety culture awareness of workers can overcome social distrust about NPPs. KHNP has been a variety efforts to improve and establish safety culture of NPPs. Safety culture framework applying global standards was set up and safety culture assessment has been carried out periodically to enhance safety culture of workers. In addition, KHNP developed various safety culture contents and they are being used in NPPs by workers. As a result of these efforts, safety culture awareness of workers is changed positively and the safety environment of NPPs is expected to be improved. KHNP makes an effort to solve areas for improvement derived from safety culture assessment. However, there are some areas to take a long time in completing the work. Therefore, these actions are necessary to be carried out consistently and continuously. KHNP also developed recently safety culture enhancement system based on web. All information related to safety culture in KHNP will be shared through this web system and this system will be used to safety culture assessment. In addition to, KHNP plans to develop safety culture indicators for monitoring the symptoms of safety culture weakening.

  6. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  7. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    Science.gov (United States)

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  8. Cost-effective conservation planning: lessons from economics.

    Science.gov (United States)

    Duke, Joshua M; Dundas, Steven J; Messer, Kent D

    2013-08-15

    Economists advocate that the billions of public dollars spent on conservation be allocated to achieve the largest possible social benefit. This is "cost-effective conservation"-a process that incorporates both monetized benefits and costs. Though controversial, cost-effective conservation is poorly understood and rarely implemented by planners. Drawing from the largest publicly financed conservation programs in the United States, this paper seeks to improve the communication from economists to planners and to overcome resistance to cost-effective conservation. Fifteen practical lessons are distilled, including the negative implications of limiting selection with political constraints, using nonmonetized benefit measures or benefit indices, ignoring development risk, using incomplete cost measures, employing cost measures sequentially, and using benefit indices to capture costs. The paper highlights interrelationships between benefits and complications such as capitalization and intertemporal planning. The paper concludes by identifying the challenges at the research frontier, including incentive problems associated with adverse selection, additionality, and slippage. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Planning adaptation for food and farming: lessons from 40 year's research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Hannah; Chambwera, Muyeye; Murray, Laurel

    2012-05-15

    Local farmers and pastoralists in poor countries have long coped with droughts, floods and variable rainfall patterns. This first-hand experience is invaluable for those working on climate change adaptation policies, but how do we access it? The International Institute for Environment and Development (IIED) has 40 years' experience working alongside vulnerable communities to help inform regional, national and global policies. Our research has shown that measures to increase climate change resilience must view food, energy, water and waste management systems as interconnected and mutually dependent. This holistic approach must also be applied to economic analysis on adaptation planning. Similarly, it is vital to use traditional knowledge and management skills, which can further support adaptation planning. Taking these lessons into account, we can then address the emerging policy challenges that we face.

  10. Lessons learned related to packaging and transportation

    International Nuclear Information System (INIS)

    Wallen, C.

    1995-01-01

    The use of lessons learned as a tool for learning from past experiences is well established, especially by many organizations within the nuclear industry. Every person has, at some time, used the principles of lessons learned to adopt good work practices based on their own experiences or the experiences of others. Lessons learned can also help to avoid the recurrence of adverse practices, which is often an area that most lessons-learned programs tend to focus on. This paper will discuss how lessons learned relate to packaging and transportation issues and events experienced at Department of Energy (DOE) facilities. It will also discuss the role performed by the Office of Nuclear and Facility Safety's Office of Operating Experience Analysis and Feedback in disseminating lessons learned and operating experience feedback to the DOE complex. The central concept of lessons learned is that any organization should be able to learn from its own experiences and events. In addition, organizations should implement methodologies to scan external environments for lessons learned, to analyze and determine the relevance of lessons learned, and to bring about the necessary changes learned from these experiences. With increased concerns toward facility safety, the importance of utilizing the lessons-learned principles and the establishment of lessons-learned programs can not be overstated

  11. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  12. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  13. Comparison of plant-specific probabilistic safety assessments and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Balfanz, H.P. [TUeV Nord, Hamburg (Germany); Berg, H.P. [Bundesamt fuer Strahlenschutz, Salzgitter (Germany); Steininger, U. [TUeV Energie- und Systemtechnik GmbH, Unternehmensgruppe TUeV Sueddeutschland, Muenchen (Germany)

    2001-11-01

    Probabilistic safety assessments (PSA) have been performed for all German nuclear power plants in operation. These assessments are mainly based on the recent German PSA guide and an earlier draft, respectively. However, comparison of these PSA show differences in the results which are discussed in this paper. Lessons learned from this comparison and further development of the PSA methodology are described. (orig.) [German] Probabilistische Sicherheitsanalysen (PSA) sind fuer alle in Betrieb befindlichen deutschen Kernkraftwerke durchgefuehrt worden. Diese Analysen basierten in der Regel auf dem aktuellen deutschen PSA-Leitfaden bzw. einem frueheren Entwurf. Ein Vergleich dieser PSA zeigt Unterschiede in den Ergebnissen, die in diesem Beitrag diskutiert werden. Erfahrungen und Erkenntnisse, die aus diesem Vergleich abgeleitet werden koennen, und weitere Entwicklungen der PSA-Methoden werden beschrieben. (orig.)

  14. NS [Nuclear Safety] update. Current safety and security activities and developments taking place in the Department of Nuclear Safety and Security, Issue no. 9, December 2008

    International Nuclear Information System (INIS)

    2008-12-01

    The current issue presents information about the following activities: 1) IRRS Lessons Learned Workshop held on 3-5 November 2008, Seville. The main purpose of the workshop was to provide information to interested Member States regarding the IRRS, to discuss their experiences and lessons learned from the regulatory review conducted at the CSN and to explore further improvements in the planning and implementation of the IRRS, including the establishment of a network of experts from regulatory authorities. 2) Highlights of the 52 General Conference. 3) The 2008 IAEA General Conference welcomed the endorsement of the new International Nuclear and Radiological Event Scale (INES) User's Manual. 4) Safety and Security Infrastructure for Countries Embarking on Nuclear Power Programmes

  15. Lessons drawn from the operation of EDF 900MW nuclear power plants to evaluate and improve safety

    International Nuclear Information System (INIS)

    Brisbois, J.; Dupuis, M.C.; Marcille, R.

    1986-06-01

    The lessons drawn from operation are used to detect the weak points not taken sufficiently into account by the design studies and to check that system availability remains at least equal to the level defined at the design stage. In both cases, they aim at deciding what remedial actions are to be taken. The latter may result in additional obligations (modification or addition of equipment or operating rules) and, in certain cases, may slacken obligations. This paper examines in turn: how are the events recorded and then analyzed, what lessons are drawn using concrete examples, what contribution is made by probabilistic risk studies using experience feedback in evaluating overall safety [fr

  16. Strengthening Regulatory Effectiveness in India – Lessons Learnt from Fukushima Accident

    International Nuclear Information System (INIS)

    Solanki, R.

    2016-01-01

    Following the Fukushima Daiichi accident in Japan, one of the most important lessons learnt, among other things, was the issue of strengthening the effectiveness of the regulatory bodies. Immediately after the Fukushima accident, National level safety audits were conducted on all operating NPPs in India to review safety of NPPs in India. A national action plan has been prepared to implement the identified short term, midterm and long term measures. The assessment indicates that national response to the Fukushima Accident for safety assessment of NPPs and subsequent actions and initiatives taken for safety enhancement of the NPPs in India are in-line with the objectives of the IAEA Action plan. This paper highlights the actions taken by India in the light of Fukushima Daiichi accident in order to strengthen the regulatory effectiveness through improvements in the existing core processes, challenges faced, Insights gained from the recent initiatives on safety performance indicators and assessment of safety culture, relevant observations of IRRS mission report and Indian perspectives on the further cooperation among the member states for enhancing the regulatory effectiveness for nuclear oversight of regulated organizations. (author)

  17. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  18. Working material. IAEA seismic safety of nuclear power plants. International workshop on lessons learned from strong earthquake

    International Nuclear Information System (INIS)

    2008-08-01

    The International Workshop on Lessons Learned from Strong Earthquake was held at Kashiwazaki civic plaza, Kashiwazaki, Niigata-prefecture, Japan, for three days in June 2008. Kashiwazaki-Kariwa NPP (KK-NPP) is located in the city of Kashiwazaki and the village of Kariwa, and owned and operated by Tokyo Electric Power Company Ltd. (TEPCO). After it experienced the Niigata-ken Chuetsu-oki earthquake in July 2007, IAEA dispatched experts' missions twice and held technical discussions with TEPCO. Through such activities, the IAEA secretariat and experts obtained up-dated information of plant integrity, geological and seismological evaluation and developments of the consultation in the regulatory framework of Japan. Some of the information has been shared with the member states through the reports on findings and lessons learned from the missions to Japan. The international workshop was held to discuss and share the information of lessons learned from strong earthquakes in member states' nuclear installations. It provided the opportunity for participants from abroad to share the information of the recent earthquake and experience in Japan and to visit KK-NPP. And for experts in Japan, the workshop provided the opportunity to share the international approach on seismic-safety-related measures and experiences. The workshop was organised by the IAEA as a part of an extra budgetary project, in cooperation with OECD/NEA, hosted by Japanese organisations including Nuclear and Industrial Safety Agency (NISA), Nuclear Safety Commission (NSC), and Japan Nuclear Energy Safety Organization (JNES). The number of the workshop participants was 70 experts from outside Japan, 27 countries and 2 international organisations, 154 Japanese experts and 81 audience and media personnel, totalling to 305 participants. The three-day workshop was open to the media including the site visit, and covered by NHK (the nation's public broadcasting corporation) and nation-wide and local television

  19. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    International Nuclear Information System (INIS)

    G. L. Sharp; R. T. McCracken

    2004-01-01

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzed in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety

  20. Safety at civil basic nuclear installations other than nuclear power plants in France. Lessons learned by IRSN from significant events reported in 2013 and 2014

    International Nuclear Information System (INIS)

    2016-01-01

    IRSN publishes the lessons learned from its analysis of significant events which have occurred in 2013 and 2014 at 82 civil basic nuclear installations (INBs) other than nuclear power plants (NPPs). Produced every two year since 2009, this report concerns 73 facilities such as plants, laboratories, facilities for the treatment, disposal and storage of waste, and facilities which have been decommissioned, and 9 research reactors, operated by around twenty different licensees in France. 210 and 227 significant events were respectively reported in 2013 and 2014 to the French Nuclear Safety Authority (ASN). This number remains similar to previous years and tends to 'stabilize' at around 200 to 220. On the one hand, among the improvements observed in 2013 and 2014, IRSN found two subjects of particular interest: - Efforts made by the licensees to increase reliability of organisational and human measures related to handling operations, in particular at the spent fuel reprocessing plant of AREVA NC La Hague and in the radioactive waste storage facilities operated by the CEA. - Important improvement program deployed by the licensee of the FBFC plant in Romans-sur-Isere (Drome) to enhance operating practices, particularly regarding management of criticality risks (prevention of uncontrolled chain reactions). On the other hand, three subjects still require special vigilance by licensees: - Ensuring full control over the safety documentation of facilities. IRSN's cross-cutting analysis of events reveal a large number of cases for which parts of the safety documentation are not fully understood at the facilities, are not applied, are inaccurate or not applicable to the situation. - Ensuring in-depth and comprehensive planning of installation clean-up and dismantling operations. Risks of worker exposure to ionising radiation are higher during these operations which may require personnel to work in close proximity to radioactive materials. - Ensuring more

  1. Evolution of a holistic systems approach to planning and managing road safety: the Victorian case study, 1970-2015.

    Science.gov (United States)

    Muir, Carlyn; Johnston, Ian R; Howard, Eric

    2018-06-01

    The Victorian Safe System approach to road safety slowly evolved from a combination of the Swedish Vision Zero philosophy and the Sustainable Safety model developed by the Dutch. The Safe System approach reframes the way in which road safety is viewed and managed. This paper presents a case study of the institutional change required to underpin the transformation to a holistic approach to planning and managing road safety in Victoria, Australia. The adoption and implementation of a Safe System approach require strong institutional leadership and close cooperation among all the key agencies involved, and Victoria was fortunate in that it had a long history of strong interagency mechanisms in place. However, the challenges in the implementation of the Safe System strategy in Victoria are generally neither technical nor scientific; they are predominantly social and political. While many governments purport to develop strategies based on Safe System thinking, on-the-ground action still very much depends on what politicians perceive to be publicly acceptable, and Victoria is no exception. This is a case study of the complexity of institutional change and is presented in the hope that the lessons may prove useful for others seeking to adopt more holistic planning and management of road safety. There is still much work to be done in Victoria, but the institutional cultural shift has taken root. Ongoing efforts must be continued to achieve alert and compliant road users; however, major underpinning benefits will be achieved through focusing on road network safety improvements (achieving forgiving infrastructure, such as wire rope barriers) in conjunction with reviews of posted speed limits (to be set in response to the level of protection offered by the road infrastructure) and by the progressive introduction into the fleet of modern vehicle safety features. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights

  2. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  3. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The liabilities include shutdown research and prototype power reactors, fuel handling facilities, radiochemical laboratories, support buildings, radioactive waste storage facilities, and contaminated lands at several sites located across eastern Canada from Quebec to Manitoba. The largest site, Chalk River Laboratories (CRL) in Ontario, will continue as an operational nuclear site for the foreseeable future. Planning and delivery of the Program is managed by the Liability Management Unit (LMU), a group that was formed within AECL for the purpose. The composition and progress of the NLLP has been reported in recent conferences. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites, and by various technical groups as suppliers to the LMU. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (which will conclude 2011 March), in planning the five-year second phase (which is currently being finalized), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Progress in executing the Program was slower than anticipated due to less than ideal alignment between some planned technical solutions and the actual requirements, as well as the

  4. Effects of Teacher Preparation Courses: Do Graduates Use What They Learned to Plan Mathematics Lessons?

    Science.gov (United States)

    Morris, Anne K.; Hiebert, James

    2017-01-01

    We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…

  5. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  6. A sample lesson plan for the course English Composition II

    Directory of Open Access Journals (Sweden)

    Córdoba Cubillo, Patricia

    2005-03-01

    Full Text Available The goal of this article is to present a lesson plan and a series of sample tasks to help the instructors from the course English Composition II, at the School of Modern Languages from the University of Costa Rica, to guide students write an essay integrating the four skills: listening, speaking, reading, and writing. These activities will be a source of comprehensible input for the learners that will hopefully result in a good writing piece. El objetivo de este artículo es presentar un plan de lección y una serie de actividades que le ayudarán a los y las instructoras del curso Composición Inglesa II de la Escuela de Lenguas Modernas de la Universidad de Costa Rica a guiar a sus estudiantes a escribir un ensayo integrando las cuatro macro-destrezas, a saber comprensión auditiva, conversación, lectura y escritura. Mediante estas actividades se espera que los estudiantes elaboren un ensayo de calidad.

  7. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  8. Nuclear Safety through International Cooperation

    International Nuclear Information System (INIS)

    Flory, Denis

    2013-01-01

    The Fukushima Daiichi nuclear accident was the worst at a nuclear facility since the Chernobyl accident in 1986. It caused deep public anxiety and damaged confidence in nuclear power. Following this accident, strengthening nuclear safety standards and emergency response has become an imperative at the global level. The IAEA is leading in developing a global approach, and the IAEA Action Plan on Nuclear Safety is providing a comprehensive framework and acting as a significant driving force to identify lessons learned and to implement safety improvements. Strengthening nuclear safety is addressed through a number of measures proposed in the Action Plan including 12 main actions focusing on safety assessments in the light of the accident. Significant progress has been made in assessing safety vulnerabilities of nuclear power plants, strengthening the IAEA's peer review services, improvements in emergency preparedness and response capabilities, strengthening and maintaining capacity building, as well as widening the scope and enhancing communication and information sharing with Member States, international organizations and the public. Progress has also been made in reviewing the IAEA's safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on accident prevention, in particular severe accidents, and emergency preparedness and response.

  9. The effectiveness of CCDSR learning model to improve skills of creating lesson plan and worksheet science process skill (SPS) for pre-service physics teacher

    Science.gov (United States)

    Limatahu, I.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.

  10. Safety, safety case and society - Lessons from the experience of the Forum on Stakeholder Confidence and other NEA initiatives

    International Nuclear Information System (INIS)

    Pescatore, Claudio

    2014-01-01

    public, even if the legal responsibilities are different for each of the actors. The safety case should serve as the liaison amongst these three groups. One must be aware that trust, familiarity and control are important components of safety. This is true for both the specialists and the non-specialists, even if each grouping may hold different expectations. When the context and purpose of the study are described in the safety case, some broader issues may usefully be mentioned/discussed: prevention, precaution, public control, justice, fairness, balance between short- and long-term protection, long-term (passive) safety. It is advisable to make it clearer in the safety case that, although they are not needed for arguing the intrinsic safety of the system after closure, further actions are planned today, such as continued oversight and RK and M preservation, that add to the system robustness both in a technical sense (reduced potential for human intrusion) and in a societal sense (continued responsibility). It would be good if, in the safety case, the provider indicated how confidence in the results was earned and that the processes for gaining confidence were made visible.5 Similarly, in decision making, the regulator, when issuing permits or licenses, should describe the basis for their confidence. The NEA has elaborated a vast literature on radioactive waste governance. It would be worthwhile to analyse it for drawing further lessons from a safety case perspective. (authors)

  11. The significance of the human factor in the safety of nuclear reactors: the French experience and the lessons of Three Mile Island

    International Nuclear Information System (INIS)

    Houze, C.; Oury, J.M.

    1982-05-01

    The importance of the human factor to French nuclear safety policy and the application of human fallibility as a parameter of safety analysis are described. The impact of reactor operating experience on future theoretical and practical application considerations is discussed. Particular reference is given to the lessons of Three Mile Island

  12. Main lessons based on the Chernobyl nuclear power plant accident liquidation experience

    International Nuclear Information System (INIS)

    Vasil'chenko, V.N.; Nosovskij, A.V.

    2006-01-01

    The authors review the main lessons of the Chernobyl nuclear power plant accident and the liquidation of its consequences in the area of the nuclear reactors safety operation, any major accident management, liquidation accident consequences criteria, emergency procedures, preventative measures and treatment irradiated victims, the monitoring methods etc. The special emphasis is put on the questions of the emergency response and the antiaccidental measures planning in frame of international cooperation program

  13. Lessons learnt from the development of the Patient Safety Incidents Reporting an Learning System for the Spanish National Health System: SiNASP.

    Science.gov (United States)

    Vallejo-Gutiérrez, Paula; Bañeres-Amella, Joaquim; Sierra, Eduardo; Casal, Jesús; Agra, Yolanda

    2014-01-01

    To describe the development process and characteristics of a patient safety incidents reporting system to be implemented in the Spanish National Health System, based on the context and the needs of the different stakeholders. Literature review and analysis of most relevant reporting systems, identification of more than 100 stakeholder's (patients, professionals, regional governments representatives) expectations and requirements, analysis of the legal context, consensus of taxonomy, development of the software and pilot test. Patient Safety Events Reporting and Learning system (Sistema de Notificación y Aprendizajepara la Seguridad del Paciente, SiNASP) is a generic reporting system for all types of incidents related to patient safety, voluntary, confidential, non punitive, anonymous or nominative with anonimization, system oriented, with local analysis of cases and based on the WHO International Classification for Patient Safety. The electronic program has an on-line form for reporting, a software to manage the incidents and improvement plans, and a scoreboard with process indicators to monitor the system. The reporting system has been designed to respond to the needs and expectations identified by the stakeholders, taking into account the lessons learned from the previous notification systems, the characteristics of the National Health System and the existing legal context. The development process presented and the characteristics of the system provide a comprehensive framework that can be used for future deployments of similar patient safety systems. Copyright © 2013 SECA. Published by Elsevier Espana. All rights reserved.

  14. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  15. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  16. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  17. A Grounded Theory of Preservice Music Educators' Lesson Planning Processes within Field Experience Methods Courses

    Science.gov (United States)

    Parker, Elizabeth Cassidy; Bond, Vanessa L.; Powell, Sean R.

    2017-01-01

    The purpose of this grounded theory study was to understand the process of field experience lesson planning for preservice music educators enrolled in choral, general, and instrumental music education courses within three university contexts. Data sources included multiple interviews, written responses, and field texts from 42 participants. Four…

  18. Safety and Mission Assurance Knowledge Management Retention: Managing Knowledge for Successful Mission Operations

    Science.gov (United States)

    Johnson, Teresa A.

    2006-01-01

    Knowledge Management is a proactive pursuit for the future success of any large organization faced with the imminent possibility that their senior managers/engineers with gained experiences and lessons learned plan to retire in the near term. Safety and Mission Assurance (S&MA) is proactively pursuing unique mechanism to ensure knowledge learned is retained and lessons learned captured and documented. Knowledge Capture Event/Activities/Management helps to provide a gateway between future retirees and our next generation of managers/engineers. S&MA hosted two Knowledge Capture Events during 2005 featuring three of its retiring fellows (Axel Larsen, Dave Whittle and Gary Johnson). The first Knowledge Capture Event February 24, 2005 focused on two Safety and Mission Assurance Safety Panels (Space Shuttle System Safety Review Panel (SSRP); Payload Safety Review Panel (PSRP) and the latter event December 15, 2005 featured lessons learned during Apollo, Skylab, and Space Shuttle which could be applicable in the newly created Crew Exploration Vehicle (CEV)/Constellation development program. Gemini, Apollo, Skylab and the Space Shuttle promised and delivered exciting human advances in space and benefits of space in people s everyday lives on earth. Johnson Space Center's Safety & Mission Assurance team work over the last 20 years has been mostly focused on operations we are now beginning the Exploration development program. S&MA will promote an atmosphere of knowledge sharing in its formal and informal cultures and work processes, and reward the open dissemination and sharing of information; we are asking "Why embrace relearning the "lessons learned" in the past?" On the Exploration program the focus will be on Design, Development, Test, & Evaluation (DDT&E); therefore, it is critical to understand the lessons from these past programs during the DDT&E phase.

  19. Charismatic Leaders: A Lesson Plan.

    Science.gov (United States)

    Johns, Robert W.

    1983-01-01

    Focusing upon Franklin D. Roosevelt and Adolf Hitler, these lessons for high school students in U.S. or world history courses deal with what charismatic leadership is, what circumstances and personality factors generate charismatic movements, and the role, results, and dangers of charismatic leadership. (RM)

  20. International Nuclear Officials Discuss IAEA Peer Reviews of Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Senior nuclear regulators today concluded a Workshop on the Lessons Learned from the IAEA Integrated Regulatory Review Service (IRRS) Missions. The U.S. Nuclear Regulatory Commission (NRC) hosted the workshop, in cooperation with the International Atomic Energy Agency, in Washington, DC, from 26 to 28 October 2011. About 60 senior regulators from 22 IAEA Member States took part in this workshop. The IRRS programme is an international peer review service offered by the IAEA to its Member States to provide an objective evaluation of their nuclear safety regulatory framework. The review is based on the internationally recognized IAEA Safety Standards. ''The United States Nuclear Regulatory Commission was pleased to host the IAEA's IRRS meeting this week. The discussions over the past three days have provided an important opportunity for regulators from many countries to come together to strengthen the international peer review process,'' said U.S. NRC Chairman Gregory B. Jaczko. ''Especially after the Fukushima Daiichi accident, the global community recognizes that IRRS missions fill a vital role in strengthening nuclear safety and security programs around the world, and we are proud to be a part of this important effort.'' The IAEA Action Plan on Nuclear Safety includes actions focused towards strengthening the existing IAEA peer reviews, incorporating lessons learned and improving their effectiveness. The workshop provided a platform for the exchange of information, experience and lessons learned from the IRRS missions, as well as expectations for the IRRS programme for the near future. Further improvements in the planning and implementation of the IRRS missions in the longer term were discussed. A strong commitment of all relevant national authorities to the IRRS programme was identified as a key element of an effective regulatory framework. The conclusions of the workshop will be issued in November 2011 and the main results will be reported to the IAEA

  1. Transparent stakeholder engagement in practice: Lessons learned from applying comprehensive environmental assessment to research planning for nanomaterials.

    Science.gov (United States)

    Powers, Christina; Hendren, Christine; Wang, Amy; Davis, J Michael

    2014-10-01

    As efforts to develop new applications of engineered nanoscale materials (ENMs) continue to grow, so too has interest in the environmental, health, and safety (EHS) implications of these materials. However, thorough evaluation and interpretation of such implications could require substantial resources (e.g., estimated as >$120 million per year in federal funding 2013-2017). A structured, strategic approach for transparently planning research would support improved linkages between ENM research and risk assessments, and thereby enhance the utility of financial and other resources for EHS studies of ENMs. For this reason, we applied Comprehensive Environmental Assessment (CEA) as an approach to provide transparent input into research planning for 2 types of ENMs: nanoscale titanium dioxide and nanoscale silver. For each of these CEA applications, we employed a collective judgment method known as Nominal Group Technique (NGT) in 2 workshops sponsored by the US Environmental Protection Agency (USEPA). The objective of this paper is to present the outcomes of these CEA applications in the context of how our methodology can inform future efforts to identify collective goals in science (e.g., research priorities) through structured decision support approaches. Outcomes include clear lists of research priorities for each ENM developed through transparently engaging stakeholders having diverse technical and sector perspectives. In addition, we identified several procedural aspects that could be refined, including emphasizing breakout group interactions, identifying broad information priorities before more detailed research questions, and using rating rather than ranking prioritization methods. Beyond the research directions identified for specific ENMs, lessons learned about engaging stakeholders in research planning are expected to inform future research planning efforts for ENMs and other emerging materials across the scientific community. © 2014 SETAC.

  2. Advances in global development and deployment of small modular reactors and incorporating lessons learned from the Fukushima Daiichi accident into the designs of engineered safety features of advanced reactors

    International Nuclear Information System (INIS)

    Hadid Subki, M.; )

    2014-01-01

    The IAEA has been facilitating the Member States in incorporating the lessons-learned from the Fukushima Dai-ichi Accident into the designs of engineered safety features of advanced reactors, including small modular reactors. An extended assessment is required to address challenges for advancing reactor safety in the new evolving generation of SMR plants to preserve the historic lessons in safety, through: assuring the diversity in emergency core cooling systems following loss of onsite AC power; ensuring diversity in reactor depressurization following a transient or accident; confirming independence in reactor trip and safety systems for sensors, power supplies and actuation systems, and finally diversity in maintaining containment integrity following a severe accident

  3. Effective Lesson Planning: Field Trips in the Science Curriculum

    Science.gov (United States)

    Rieger, C. R.

    2010-10-01

    Science field trips can positively impact and motivate students. However, if a field trip is not executed properly, with appropriate preparation and follow-up reinforcement, it can result in a loss of valuable educational time and promote misconceptions in the students. This study was undertaken to determine if a classroom lesson before an out-of-the-classroom activity would affect learner gain more or less than a lesson after the activity. The study was based on the immersive theater movie ``Earth's Wild Ride'' coupled with a teacher-led Power Point lesson. The participants in the study were students in a sixth grade physical science class. The order of lessons showed no detectable effect on final learner outcomes. Based on pre- and post-testing, improvement in mean learning gain came from the teacher-led lesson independent of the movie. The visit to the immersive theater, however, had significant positive effects that did not show up in the quantitative results of the testing.

  4. Improving the primary school science learning unit about force and motion through lesson study

    Science.gov (United States)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  5. Convincing American Women to Join in the Efforts to Win World War I: A Lesson Plan.

    Science.gov (United States)

    Sunal, Cynthia S.; Haas, Mary E.

    1994-01-01

    Asserts that World War I, unlike previous wars, was not fought by small groups of professional soldiers, but with large groups of citizens, including women. Presents a lesson plan using poster and postcards that examines methods used by the U.S. government to rally women to join the war effort. (CFR)

  6. Evaluation procedure of software safety plan for digital I and C of KNGR

    International Nuclear Information System (INIS)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4

  7. Evaluation procedure of software safety plan for digital I and C of KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4.

  8. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  9. Denakenaga' for Children. Lesson Plans for Teaching Denakenaga' (Minto-Nenana Tanana) to Children in Elementary Grades.

    Science.gov (United States)

    Thompson, Chad; Frank, Ellen

    This curriculum for elementary school-level instruction in Denakenaga' is intended for development of oral native language skills. Included are plans for 60 25-minute lessons, arranged in 11 units: basic conversation; food and eating; hunting and animals; clothing and morning routine; weather; body parts; dogs and sleds; numbers; the village;…

  10. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  11. Accidents in industrial radiography and lessons to be learned. A review of IAEA Safety Report

    International Nuclear Information System (INIS)

    Modupe, M.S.; Oresegun, O.

    1998-01-01

    This IAEA Safety Report Series publication is the result of a review of a large selection of accidents in industrial radiography which Regulatory Authorities, professional associations and scientific journals have reported. The review's objective was to draw lessons from the initiating events of the accidents, contributing factors and the consequences. A small, representative selection of accident descriptions is used to illustrate the primary causes of radiography accidents and a set of recommendations to prevent recurrence of such accidents or to mitigate the consequences of those that do occur is provided. By far the most common primary cause of over-exposure was 'Failure to follow operational procedures' and specifically failure to perform radiation monitoring to locate the position of the source. The information in the Safety Report is intended for use by Regulatory Authorities, operating organizations, workers manufacturers and client organizations having responsibilities for radiation protection and safety in industrial radiography. (author)

  12. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  13. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  14. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  15. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  16. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  17. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  18. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  19. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  20. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  1. Evaluating Eyewitness Reports [Lesson Plan].

    Science.gov (United States)

    2000

    This lesson offers students experience in making historical meaning from eyewitness accounts that present a range of different perspectives. Students begin with a case study in working with alternative reports of a single event: the Great Chicago Fire of 1871. First, they compare two newspaper reports on the fire, then two memoirs of the fire…

  2. Support and Dissemination of Teacher-Authored Lesson Plans: a Digital Library for Earth System Education (DLESE) and Geological Society of America (GSA) Collaboration

    Science.gov (United States)

    Devaul, H.; Pandya, R. E.; McLelland, C. V.

    2003-12-01

    The Digital Library for Earth System Education (www.dlese.org) and the Geological Society of America (www.geosociety.org) are working together to publish and disseminate teacher-authored Earth science lesson plans. DLESE is a community-based effort involving teachers, students, and scientists working together to create a library of educational resources and services to support Earth system science education. DLESE offers free access to electronic resources including lesson plans, maps, images, data sets, visualizations, and assessment activities. A number of thematic collections have recently been accessioned, which has substantially increased library holdings. Working in concert with GSA, a non-profit organization dedicated to the advancement of the geosciences, small-scale resource creators such as classroom teachers without access to a web server can also share educational resources of their own design. Following a two-step process, lesson plans are submitted to the GSA website, reviewed and posted to the K-12 resource area: http://www.geosociety.org/educate/resources.htm. These resources are also submitted to the DLESE Community Collection using a simple cataloging tool. In this way resources are available to other teachers via the GSA website as well as via the DLESE collection. GSA provides a template for lesson plan developers which assists in providing the necessary information to help users find and understand the intent of the activity when searching in DLESE. This initial effort can serve as a prototype for important services allowing individual community members to contribute their work to DLESE with little technical overhead.

  3. Planning and evaluation of plant under safety aspects

    International Nuclear Information System (INIS)

    Strnad, H.

    1985-01-01

    Plant denotes a technical product characterized as being structured, complex, comprising the use of energy, and that of measuring, automatic control and monitoring systems to keep track of present, control and monitor processes. Particular attention is paid to methods of developing plant concepts, measures to exclude or detect risks, integration of safety engineering into the course of planning, safety concept and ergonomics in plant design. (DG) [de

  4. I Can Hardly Wait to See What I Am Going to Do Today: Lesson Planning Perspectives of Experienced Band Teachers

    Science.gov (United States)

    Shaw, Ryan D.

    2017-01-01

    The purpose of this study was to investigate the lesson planning practices of three experienced band teachers at the high school level. For the purposes of this study, experienced teachers were those with 25 or more years of teaching experience. Research questions were: (a) how do experienced high school band teachers plan for teaching, and (b)…

  5. Safety and communication, a winning combination

    CERN Multimedia

    HSE Unit

    2014-01-01

    Since 2013, in line with its mission to support CERN’s proactive communication policy in matters of safety, the HSE unit has been following an annual plan for disseminating information on occupational health and safety and environmental protection.   Safety information designed to underline the importance of prevention is published through a variety of channels: Announcements in the CERN Bulletin, Safety bulletins, notably outlining lessons to be learned in the wake of accidents/incidents occuring at CERN, Safety alerts calling for immediate action, sent by e-mail to the services concerned, Prevention campaigns on the CERN site, Poster campaigns in well frequented public areas. Photo: Christoph Balle. Please heed all prevention messages and apply them in your everyday life. Also, we will be pleased to receive any information or suggestions you may have on safety matters. If you have questions about the HSE unit’s communication activities, please send us an e...

  6. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  7. Beautiful Beads: A Lesson in Making Beads with Friendly Clay. AMACO[R] Lesson.

    Science.gov (United States)

    Gamble, Harriet; Gamble, David

    This lesson resource includes a brief summary of the history of bead making and historic fascination with beads as adornment. A focus on design elements, color theory, craftsmanship, and technical skill in bead making is encouraged. The plan includes lesson goals and objectives; background preparation; a glossary of terms; a list of supplies; and…

  8. Roadmap on R&D and Human Resource for Light Water Reactors Safety and Knowledge Management: Status in Japan

    International Nuclear Information System (INIS)

    Sekimura, N.

    2016-01-01

    Full text: The roadmap for light water reactor safety technology and human resource has been constructed by the Special Committee on Nuclear Safety Research Roadmap in the Atomic Energy Society of Japan (AESJ). Based upon the lessons learned from the Fukushima Daiichi accident, effective planning of research activities to improve safety can also contribute to enhance human resource and management of accumulated knowledge-base in the future domestic and international community. (author

  9. Nuclear Safety Review 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis.

  10. Nuclear Safety Review 2013

    International Nuclear Information System (INIS)

    2013-07-01

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis

  11. Definitions and Basic Concepts of Supply and Demand Analysis Used to Determine Market Equilibrium. Principles of Economics II (Microeconomics), Lesson Plan No. 6.

    Science.gov (United States)

    Chiu-Irion, Vicky

    Developed as part of a 37.5-hour microeconomics course, this lesson plan focuses on the concepts of supply and demand analysis used to determine market equilibrium. The objectives of the 50-minute lesson are to enable the student to: (1) explain how a demand schedule is derived from raw data; (2) graph a demand curve from the demand schedule; (3)…

  12. National Training Course. Emergency Medical Technician. Paramedic. Instructor's Lesson Plans. Module II. Human Systems and Patient Assessment.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This instructor's lesson plan guide on human systems and patient assessment is one of fifteen modules designed for use in the training of emergency medical technicians (paramedics). Four units are presented: (1) medical terminology, which covers some common prefixes and suffixes and the use of the medical dictionary; (2) an overview of the…

  13. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  14. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  15. Spent Nuclear Fuel Transportation: An Examination of Potential Lessons Learned From Prior Shipping Campaigns

    International Nuclear Information System (INIS)

    M. Keister; K, McBride

    2006-01-01

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, assigned the Department of Energy (DOE) responsibility for developing and managing a Federal system for the disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for accepting, transporting, and disposing of SNF and HLW at the Yucca Mountain repository (if licensed) in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. OCRWM faces a near-term challenge--to develop and demonstrate a transportation system that will sustain safe and efficient shipments of SNF and HLW to a repository. To better inform and improve its current planning, OCRWM has extensively reviewed plans and other documents related to past high-visibility shipping campaigns of SNF and other radioactive materials within the United States. This report summarizes the results of this review and, where appropriate, lessons learned. The objective of this lessons learned study was to identify successful, best-in-class trends and commonalities from past shipping campaigns, which OCRWM could consider when planning for the development and operation of a repository transportation system. Note: this paper is for analytical and discussion purposes only, and is not an endorsement of, or commitment by, OCRWM to follow any of the comments or trends. If OCRWM elects to make such commitments at a future time, they will be appropriately documented in formal programmatic policy statements, plans and procedures. Reviewers examined an extensive study completed in 2003 by DOE's National Transportation Program (NTP), Office of Environmental Management (EM), as well as plans and documents related to SNF shipments since issuance of the NTP report. OCRWM examined specific planning, business, institutional and operating practices that have been identified by DOE, its transportation contractors

  16. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  17. 77 FR 58488 - Hawaii State Plan for Occupational Safety and Health

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health AGENCY: Occupational... announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State...

  18. The implementation of school-based lesson study at elementary school

    Directory of Open Access Journals (Sweden)

    Purnomo Purnomo

    2017-07-01

    Full Text Available This study aims to describe and interpret the implementation of school-based lesson study in SDN I Kretek. This study uses the qualitative research. The data were collected through in-depth interviews, participant observation, field notes, and documentation. The data validity was determined through sources and techniques triangulation. The data were analyzed using the Interactive Analysis Model from Miles and Huberman. The results show: (1 the planning of school-based lesson study program at SDN 1 Kretek has been implemented from the beginning of the school year 2014/2015 by establishing school-based lesson study team. This team is responsible for planning, managing, and evaluating school-based lesson study program at SDN 1 Kretek, (2 school-based lesson study at SDN 1 Kretek is implemented in three phases, namely planning, implementation, and reflection, and (3 The evaluation of lesson study is conducted by each teacher who has conducted the open class and conducted thoroughly with a meeting by a team of school-based lesson study SDN 1 Kretek at the end of the school year.

  19. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  20. Development of a health safety culture under different social and cultural conditions: lessons from the experiences of Japanese utilities

    International Nuclear Information System (INIS)

    Taniguchi, Taketoshi

    1998-01-01

    In anticipation of the steady expansion of nuclear power in Asia, all organizations involved in operating nuclear facilities are emphasizing the importance of regional cooperation in the development and enhancement of a safety culture. This paper, based on employees' attitudinal surveys, provides some lessons learned from the experiences of Japanese electric utilities in developing and enhancing a sound safety culture within the organizations which are operating nuclear power plants and related facilities, and discusses approaches for cooperation in Asia, taking into account the different socio-cultural environments. (author)

  1. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  2. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  3. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  4. Good Practice Lessons from the Urban Traffic Project, Denmark

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    In 1990, as the first government in the world, the Danish Cabinet approved a national action plan for sustainable transport. In 1992, as part of the implementation of this plan, the Urban Traffic Project was set up with the EPA. The policy situation was one of a state agency trying to motivate...... urban municipalities to work with T&E (transport and environment) integration, i.e. integration of concerns for safety, energy, air quality, noise etc. in urban traffic planning. 50 major urban municipalities participated in the project. The most important lessons to be learned from the project are: (1......) With a fairly modest investment (DKK 150 million in seed money) it has been possible on a voluntary basis to motivate the majority of urban municipalities to work with T&E integration. (2) The top motivating factor for municipalities to participate was a desire for organisational and professional learning. (3...

  5. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  6. Developing strategic plans for effective utilization of research reactors

    International Nuclear Information System (INIS)

    Ridikas, Danas

    2015-01-01

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  7. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  8. School Climate: An Essential Component of a Comprehensive School Safety Plan

    Science.gov (United States)

    Stark, Heidi

    2017-01-01

    The intentional assessment and management of school climate is an essential component of a comprehensive school safety plan. The value of this preventive aspect of school safety is often diminished as schools invest resources in physical security measures as a narrowly focused effort to increase school safety (Addington, 2009). This dissertation…

  9. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  10. Lessons Learned from Process Safety Management: A Practical Guide to Defence in Depth

    Energy Technology Data Exchange (ETDEWEB)

    Langerman, N., E-mail: neal@chemical-safety.com [Advanced Chemical Safety, Inc., San Diego (United States)

    2014-10-15

    Full text: Beginning with the experiences of Alfred Nobel, the chemical enterprise has learned from failures and implemented layers of protection to prevent unwanted incidents. Nobel developed dynamite as a more stable alternative to nitroglycerin, a process we would today call “inherently safer technology”. In recent years, the USA has issued regulations requiring formal “risk management plans” to identify and mitigate production risks. The USA set up the “Chemical Safety and Hazard Investigation Board” as an independent investigator of serious chemical enterprise incidents with a mission to issue recommendations aimed at preventing repeated incidents based on lessons learned. Following a particularly violent explosion in Texas in 1989, the US Occupational Safety and Health Administration issued the “Process Safety Management” (PSM) rule. PSM is a singular guide to defence in depth for preventing large-scale production incidents. The formalism is equally applicable to the chemical enterprise and the nuclear installation enterprise. This presentation will discuss the key elements of PSM and offer suggestions on using PSM as a guide to developing multiple layers of protection. The methods of PSM are applicable to Nuclear Generating Stations, research reactors, fuel reprocessing plants and fissile material storage and handling. Examples from both the chemical and nuclear enterprises will be used to illustrate key points. (author)

  11. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  12. Action plan in response to March 1981 report to NFPQT Committee

    International Nuclear Information System (INIS)

    1981-03-01

    This plan of action has been prepared at the direction of the Acting Under Secretary in response to the report of the Nuclear Facilities Personnel Qualifications and Training (NFPQT) Committee on A Safety Assessment of Department of Energy Nuclear Reactors. Senior Department officials with Headquarters responsibilities for the safety of nuclear facilities owned by and operated for the Department have developed this plan with input from the operations office managers having operational responsibility for such facilities. A summary of the plan's objectives and a cross-reference to the findings of the NFPQT Committee Report is attached to the plan. Appendix A contains implementing actions and Appendix B contains a summary of actions responsive to lessons learned from the TMI accident that have been completed or are well underway. Although the plan is written in definitive language, the specific actions (such as organization realignments and proposals) will be subject to appropriate review and approval. Also, other adjustments may be required as the actions are implemented

  13. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  14. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  15. Mathematics teachers’ reflective practice within the context of adapted lesson study

    Directory of Open Access Journals (Sweden)

    Barbara Posthuma

    2012-11-01

    Full Text Available There seems to be paucity of research in South Africa on mathematics teachers’ reflective practice. In order to study this phenomenon, the context of lesson study (in an adapted form was introduced to five mathematics teachers in a rural school in the Free State. The purpose was to investigate their reflective practice whilst they collaboratively planned mathematics lessons and reflected on the teaching of the lessons. Data were obtained through interviews, video-recorded lesson observations, field notes taken during the lesson study group meetings and document analyses (lesson plans and reflective writings. The adapted lesson study context provided a safe space for teachers to reflect on their teaching and they reported an increase in self-knowledge and finding new ways of teaching mathematics to learners. This finding has some potential value for planning professional learning programmes in which teachers are encouraged to talk about their classroom experiences, share their joys and challenges with one another and strive to build a community of reflective practitioners to enhance their learners’ understanding of mathematics.

  16. Effect of tailored on-road driving lessons on driving safety in older adults: A randomised controlled trial.

    Science.gov (United States)

    Anstey, Kaarin J; Eramudugolla, Ranmalee; Kiely, Kim M; Price, Jasmine

    2018-06-01

    We evaluated the effectiveness of individually tailored driving lessons compared with a road rules refresher course for improving older driver safety. Two arm parallel randomised controlled trial, involving current drivers aged 65 and older (Mean age 72.0, 47.4% male) residing in Canberra, Australia. The intervention group (n = 28) received a two-hour class-based road rules refresher course, and two one-hour driving lessons tailored to improve poor driving skills and habits identified in a baseline on-road assessment. The control group (n = 29) received the road rules refresher course only. Tests of cognitive performance, and on-road driving were conducted at baseline and at 12-weeks. Main outcome measure was the Driver safety rating (DSR) on the on-road driving test. The number of Critical Errors made during the on-road was also recorded. 55 drivers completed the trial (intervention group: 27, control group: 28). Both groups showed reduction in dangerous/hazardous driver errors that required instructor intervention. From baseline to follow-up there was a greater reduction in the number of critical errors made by the intervention group relative to the control group (IRR = 0.53, SE = 0.1, p = .008). The intervention group improved on the DSR more than the control group (intervention mean change = 1.07 SD = 2.00, control group mean change = 0.32 SD = 1.61). The intervention group had 64% remediation of unsafe driving, where drivers who achieved a score of 'fail' at baseline, 'passed' at follow-up. The control group had 25% remediation. Tailored driving lessons reduced the critical driving errors made by older adults. Longer term follow-up and larger trials are required. Copyright © 2018 Elsevier Ltd. All rights reserved.

  17. Lessons in Nuclear Safety, Panel on Integration of People and Programs

    International Nuclear Information System (INIS)

    Pinkston, David

    2015-01-01

    Four slides present a historical perspective on the evolution of nuclear safety, a description of systemic misalignment (available resources do not match expectations, demographic cliff developing, promulgation of increased expectations and new requirements proceeds unabated), and needs facing nuclear safety (financial stability, operational stability, and succession planning). The following conclusions are stated under the heading ''Nuclear Safety - 'The System''': the current universe of requirements is too large for the resource pool available; the current universe of requirements has too many different sources of interpretation; there are so many indicators that it's hard to know what is leading (or important); and the net result can come to defy integrated comprehension at the worker level.

  18. Safety and operating experience at EBR-II: lessons for the future

    International Nuclear Information System (INIS)

    Sackett, J.I.; Golden, G.H.

    1981-01-01

    EBR-II is a small LMFBR power plant that has performed safely and reliably for 16 years. Much has been learned from operating it to facilitate the design, licensing, and operation of large commercial LMFBR power plants in the US. EBR-II has been found relatively easy to keep in conformity with evolving safety requirements, largely because of inherent safety features of the plant. Such features reduce dependence on active safety systems to protect against accidents. EBR-II has experienced a number of plant-transient incidents, some planned, others inadvertent; none has resulted in any significant plant damage. The operating experience with EBR-II has led to the formulation of an Operational Reliability Test Program (ORTP), aimed at showing inherently safe performance of fuel and plant systems

  19. Lessons and challenges from adaptation pathways planning applications

    Science.gov (United States)

    Haasnoot, M.; Lawrence, J.; Kwakkel, J. H.; Walker, W.; Timmermans, J.; Bloemen, P.; Thissen, W.

    2015-12-01

    Planning for adaptation to dynamic risks (e.g., because of climate change) is a critical need. The concept of 'adaptive policies' is receiving increasing attention as a way of performing strategic planning that is able to address many of the inherent challenges of uncertainty and dynamic change. Several approaches for developing adaptive policies are available in the literature. One approach, for which several applications already exist, is Dynamic Adaptive Policy Pathways (DAPP). Pathway maps enable policy analysts, decision makers, and stakeholders to recognize potential 'locked-in' situations and to assess the flexibility, robustness, and efficacy of decision alternatives. Most of the applications of DAPP have been in deltas, coastal cities, or floodplains, often within the context of climate change adaptation. In this talk, we describe the DAPP approach and present a framework for designing signposts as adaptation signals, together with an illustrative application for the Rhine River in the Netherlands. We also draw lessons and challenges from pathways applications that differ in environment, culture, and institutional context. For example, the Dutch Delta Programme has used pathways to identify short-term decisions and long-term policy options. In Bangladesh, an application is in its early phase. Steps before generating pathways - such as long- term thinking in multiple possible futures and acknowledging uncertainties - are already a big challenge there. In New Zealand, the 'Sustainable Delta Game' has been used as the catalyst for pathways thinking by two local councils. This has led to its application in decision making for coastal and flood risk management and economic analysis of policy options.

  20. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  1. Fourteen lessons learned from the successful nuclear power program of the Republic of Korea

    International Nuclear Information System (INIS)

    Choi, Sungyeol; Jun, Eunju; Hwang, IlSoon; Starz, Anne; Mazour, Tom; Chang, SoonHeung; Burkart, Alex R.

    2009-01-01

    This paper summarized a development history and lessons of Korean nuclear power infrastructures from the beginning of the nuclear power program in 1956 to the localization of complete scope of PWR technology in 1990. The objective of this paper is to show the guideline on the issues that the development of a national infrastructure for nuclear power using the realistic experiences in order to help the developing countries newly starting nuclear power program as a long-term energy supply option. Development strategies and lessons learned from the successful Korean experience have been presented based on milestones structure of IAEA in order to help decision makers, advisers, senior managers and national planners of nuclear power program. Lessons for national nuclear power programs include considerations before launching a program, preparation and decision making, and the construction of the first nuclear power plant. Scope of these lessons includes knowledge and human resources management, financial and industrial infrastructure development, nuclear safety, legislative and regulatory experiences, fuel cycle and waste management, international cooperation. Fourteen lessons learned either positive or not are derived from the Korean case and are suggested for incorporation in the IAEA's efforts in support of developing countries' development of nuclear infrastructure and planning.

  2. Implementing and measuring safety goals and safety culture. 4. Utility's Activities for Better Safety Culture After the JCO Accident

    International Nuclear Information System (INIS)

    Omoto, Akira

    2001-01-01

    The criticality accident at the JCO plant prompted the Government to enact a law for nuclear emergency preparedness. The nuclear industry established NSnet to facilitate opportunities for peer review among its members. This paper describes the activities by NSnet and TEPCO's Kashiwazaki-Kariwa nuclear power station (NPS) for a better safety culture. Created as a voluntary organization by the nuclear industry in 1999, NSnet has 35 members and is assisted by CRIEPI and NUPEC for its activities relevant to human factors. Given the fact that nuclear facility operators not belonging to WANO had no institutional system available for exchange of experiences and good practices for better safety among themselves, NSnet's activities focus on peer review by member organizations and onsite seminars. Starting April 2000 with visits to three fuel fabricators, NSnet intends to have 23 peer-review visits in 2 yr (Ref. 1). The six-member review team stays on-site for 4 days, during which time they review-using guidelines available from WANO and IAEA-OSART-six areas: organization/management, emergency preparedness, education/training, operation/ maintenance, protection against occupational radiation exposure, and prevention of accidents. A series of on-site seminars is held at members' nuclear facilities, to which NSnet dispatches experts for lectures. NSnet plans to hold such seminars twice per month. Other activities include information-sharing through a newsletter, a Web site (www. nsnet.gr.jp), and others. Although considerable differences exist in the design and the practices in operation/maintenance between power reactors and JCO, utilities can extract lessons from the accident that will be worth consideration for their own facilities in the areas of safety culture, education and training, and interface between design and operation. This thinking prompted the Nuclear Safety Promotion Center at Kashiwazaki-Kariwa NPS, to which the author belonged at that time, to launch the

  3. Safety research basic plan of JNC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan Nuclear Cycle Development Institute (JNC) formally succeeded to Power Reactor and Nuclear Fuel Development Corporation (PNC) on October, 1 1998. This report describes the basic plan for major program of JNC which consists of two parts: management philosophy of the new institute and the latest revised medium term program. In the first part, the primary mission of JNC is to perform its R and D concentrating on fast breeder reactor and its fuel cycle, and treatment and disposal of high-level radioactive wastes, while at the same time giving special consideration to safety. In the second, individual programs in the new basic plan are discussed in detail. The outline and schedule of each program are also attached in the table form. (H. Itami)

  4. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  5. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  6. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  7. Lessons Learned in the Update of a Safety Limit for the High Flux Isotope Reactor

    International Nuclear Information System (INIS)

    Cook, David Howard

    2009-01-01

    A recent unreviewed safety question (USQ) regarding a portion of the High Flux Isotope Reactor (HFIR) transient decay heat removal analysis focused on applicability of a heat transfer correlation at the low flow end of reactor operations. During resolution of this issue, review of the correlations used to establish the safety limit (SL) on reactor flux-to-flow ratio revealed the need to change the magnitude of the SL at the low flow end of reactor operations and the need to update the hot spot fuel damage criteria to incorporate current knowledge involving parallel channel flow stability. Because of the original safety design strategy for the reactor, resolution of the issues for the flux-to-flow ratio involved reevaluation of all key process variable SLs and limiting control settings (LCSs) using the current version of the heat transfer analysis code for the reactor. Goals of the work involved updating and upgrading the SL analysis where necessary, while preserving the safety design strategy for the reactor. Changes made include revisions to the safety design criteria at low flows to address the USQ, update of the process- and analysis input-variable uncertainty considerations, and upgrade of the safety design criteria at high flow. The challenges faced during update/upgrade of this SL and LCS are typical of the problems found in the integration of safety into the design process for a complex facility. In particular, the problems addressed in the area of instrument uncertainties provide valuable lessons learned for establishment and configuration control of SLs for large facilities

  8. Lessons learned from early criticality accidents

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1996-01-01

    Four accidents involving the approach to criticality occurred during the period July, 1945, through May, 1996. These have been described in the format of the OPERATING EXPERIENCE WEEKLY SUMMARY which is distributed by the Office of Nuclear and Facility Safety. Although the lessons learned have been incorporated in standards, codes, and formal procedures during the last fifty years, this is their first presentation in this format. It is particularly appropriate that they be presented in the forum of the Nuclear Criticality Technology Safety Project Workshop closest to the fiftieth anniversary of the last of the four accidents, and that which was most instrumental in demonstrating the need to incorporate lessons learned

  9. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  10. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  11. AREVA General Inspectorate Annual Report 2013 - Status of safety in nuclear facilities

    International Nuclear Information System (INIS)

    Oursel, Luc; Riou, Jean

    2014-06-01

    This annual report by AREVA's General Inspectorate deals with the status of nuclear safety and radiation protection in the group's facilities and operations over the course of 2013. Based on the findings made during implementation of the annual inspection program, this annual report also includes the results of the analysis of significant events and the observations and assessments of specialists in the Safety Health Security Sustainable Development Department (SHSSDD), supplemented by regular interaction with the safety regulators, different government agencies, stakeholders and other nuclear operators. Additionally, this report presents the action plans put into motion and the directions taken for continuous improvement in risk prevention for operations conducted in France and internationally. In 2013, the level of safety in the group's nuclear facilities and operations remained satisfactory, although improvements are necessary in some domains. This report is based on established indicators, analyses of reported events, responses to commitments made to the regulators, and the results of different improvement actions reported on in the inspected and supported entities. In 2013, no level 2 event on the International Nuclear and Radiological Event Scale (INES) was reported, the bottom-up reporting of weak signals was confirmed, dose levels were low and there were no radiological impacts on the environment. The General Inspectorate conducted 45 inspections in 30 of the group's entities in 2013. Of these, 10 concerned sites outside France and 7 were conducted following events or particular situations. These inspections gave rise to 176 recommendations, which the inspected entities have translated into action plans. Verification of these different action plans according to planned procedures and announced schedules gave rise to 16 follow-up inspections. The major lessons learned from these inspections relate to project management, facility compliance and operational

  12. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  13. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  14. Considering lessons learned about safety culture and their reflection to activity. After Fukushima Daiichi Nuclear Power Plant accident experience

    International Nuclear Information System (INIS)

    Obu, Etsuji; Hamada, Jun; Fukano, Takuya

    2011-01-01

    Fukushima Daiichi Nuclear Power Plant accident forced neighboring residents to evacuate for a long time and gave Public anxieties greatly and significant effects to social activities in Japan. Public trust of nuclear power was lost by not preventing the accident and future of nuclear power became reconsidered, which nuclear industry people regretted deeply. Japan Nuclear Technology Institute (JANTI) had conducted activities enhancing safety culture in nuclear industry. It would be necessary to consider improvements of accident prevention and mitigation measures after evaluating the accident in a viewpoint of 'safety culture'. Based on published information and knowledge accumulated by activities of JANTI, the accident was examined taking account of greatness of nuclear accident and its effects from the side of safety culture. Lessons learned about safety culture were pointed out as; (1) reconfirmation of specialty of nuclear technology. (2) reinforcement of questioning and learning attitudes and (3) improvement of evaluation capability of nuclear safety and safety assurance against external event. These were reflected in activities such as; (1) reconsideration of safety culture assessment, (2) strengthening further support to improve safety culture consciousness and (3) improvement of peer review activity. (T. Tanaka)

  15. National planning guidelines for environment ally sustainable development in Scotland and lessons learnt for Pakistan

    International Nuclear Information System (INIS)

    Qamar-ul-Islam; Anjum, G.A.; Shahzad, M.

    2005-01-01

    This piece of research work reflects the researcher's academic as well as the practical experiences of Scottish planning about the concept, issues and policy formulations. It is in the context of National Planning Policy Guidelines, originated in Scotland with particular reference to it's Fife Region. The first part reflects the general overview of Scotland followed by brief description of the region. Another part deals with the existing strategic issues in the region which are related to land and the environment notably rural planning priorities, agricultural scarce land, conservation of recreational and tourist areas, forest land potentials, landscape resources, national scenic areas, petro-chemical, industrial zones, river pollution and future land use for housing. This study has suggested National Planning Policy Guidelines to these issues. Last section deals with the lessons learnt from Scotland and appropriate application of these guidelines in case of Pakistan. The establishment of the relevant National Planning Guidelines according to our local environmental and socio-economic conditions can also play a significant role to safe guard our rural and urban landscapes and their respective environments. These broad guidelines must therefore be recommended in the broader spectrum in spatial linkage. Moreover these guidelines must therefore synthesize and articulated specifically at structure plans, master plans at district, sub district or local plans and planning processes which can lead Pakistan towards environmentally sustainable development. (author)

  16. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  17. A Qualitative Study on Primary School Mathematics Lesson Evaluation

    Science.gov (United States)

    Zhao, Dongchen; Ma, Yunpeng

    2009-01-01

    Through the qualitative interviews of five implementers of primary school mathematics curriculum, this study addresses the ways in which mathematics lessons are evaluated. Results show that each evaluator recognizes different aspects of a "good lesson," however, among all criteria, the design of the lesson plan, realization of the lesson…

  18. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  19. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  20. Sharing Lessons Learned Between Industries in EU

    International Nuclear Information System (INIS)

    Muehleisen, A.; Strucic, M.

    2012-01-01

    Recent events in nuclear industry remind us on importance of continuous sharing of the knowledge and experience gained through evaluations of incidents and accidents. We frequently use experience from our daily life activities to improve our performance and avoid some mistakes or unwanted events. In the similar way we can use other industries experience. These experiences can be applied to improve nuclear safety. For example, Safety Culture, which has a great influence on the level of nuclear power plants safety, is similarly presented in other industries. Mechanisms which led to accidents from weak safety culture in one branch of other industry could be comparable to those in nuclear industry. Some other industries have many more cumulative years of experience than nuclear industry. Aviation and Oil industries are typical representatives. Part of their experience can be used in nuclear industry too. Number of reports from nuclear power plants showed us that not only specific equipment related causes lay behind accidents; there are also other causes and contributors which are more common for all industries. Hence lessons learned in other industry should be assessed and used in nuclear industry too. In the European Union, a regional initiative has been set up in 2008 in support of EU Member State nuclear safety authorities, but also EU technical support organizations, international organizations and the broader nuclear community, to enhance nuclear safety through improvement of the use of lessons learned from operational experience of nuclear power plants (NPPs). The initiative, called ''the EU Clearinghouse on Operational Experience Feedback for NPP'', is organized as a network operated by a centralized office located at the Joint Research Centre of the European Commission. The reduction of occurrence and significance of events in NPPs and their safe operation is its ultimate goal. Among others EU Clearinghouse provides services such as technical and scientific

  1. Lessons learned from accidents in radiotherapy. An IAEA Safety Report

    International Nuclear Information System (INIS)

    Ortiz, P.

    1998-01-01

    Radiotherapy is a very special application from the view point of protection because humans are deliberately exposed to high doses of radiation, and no physical barrier can be placed between the source and the patient. It deserves, therefore, special considerations from the point of view of potential exposure. An IAEA's Safety Report (in preparation) reviews a large collection of accident information, their initiating events and contributing factors, followed by a set of lessons learned and measures for prevention. The most important causes were: deficiencies in education and training, lack of procedures and protocols for essential tasks (such as commissioning, calibration, commissioning and treatment delivery), deficient communication and information transfer, absence of defence in depth and deficiencies in design, manufacture, testing and maintenance of equipment. Often a combination of more than one of these causes was present in an accident, thus pointing to a problem of management. Arrangements for a comprehensive quality assurance and accident prevention should be required by regulations and compliance be monitored by a Regulatory Authority. (author)

  2. Safety activities and human resource development at NCA

    International Nuclear Information System (INIS)

    Kumanomido, Hironori; Sakurada, Koichi; Yanagisawa, Shigeru; Masuyama, Tadaharu

    2015-01-01

    Toshiba Nuclear Critical Assembly (NCA) has been safely operated since the first criticality in December 1963. The topics covered in this Yayoi Meeting Report are: (1) the outline of NCA, (2) the safety control situation mainly after the Great East Japan Earthquake in 2011, (3) educational training incorporates the lessons learned in this earthquake, and (4) human resource development during 2008-2015. Regarding safety control, facility maintenance has been conducted systematically according to the maintenance plan from the viewpoint of preventive maintenance. Regarding educational training, two disaster handling training based on the safety regulation and one nuclear emergency drill based on the emergency drill plan for licensee of nuclear energy activity based on the Act of Special Measures Concerning Nuclear Emergency Preparedness every year. Regarding human resource development, development training was given to 358 people including students. This year, training that does not require NCA operation was conducted including gamma-ray spectrum measurement of NCA fuel rod and neutron deceleration property measurement using 252 Cf neutron source. (S.K.)

  3. Lessons learned: wrong intraocular lens.

    Science.gov (United States)

    Schein, Oliver D; Banta, James T; Chen, Teresa C; Pritzker, Scott; Schachat, Andrew P

    2012-10-01

    To report cases involving the placement of the wrong intraocular lens (IOL) at the time of cataract surgery where human error occurred. Retrospective small case series, convenience sample. Seven surgical cases. Institutional review of errors committed and subsequent improvements to clinical protocols. Lessons learned and changes in procedures adapted. The pathways to a wrong IOL are many but largely reflect some combination of poor surgical team communication, transcription error, lack of preoperative clarity in surgical planning or failure to match the patient, and IOL calculation sheet with 2 unique identifiers. Safety in surgery involving IOLs is enhanced both by strict procedures, such as an IOL-specific "time-out," and the fostering of a surgical team culture in which all members are encouraged to voice questions and concerns. Copyright © 2012 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.

  4. Upper School Maths: Lesson Plans and Activities for Ages 9-11 Years. Series of Caribbean Volunteer Publications, No. 9.

    Science.gov (United States)

    Voluntary Services Overseas, Castries (St. Lucia).

    This collection of lesson plans and activities for students aged 9-11 years is based on a science curriculum developed by a group of Caribbean nations. The activities pertain to topics such as place value, prime and composite numbers, the sieve of Eratosthenes, square numbers, factors and multiples, sequences, averages, geometry, symmetry,…

  5. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  6. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  7. "Hamlet" Meets "Chushingura": Traditions of the Revenge Tragedy. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson seeks to sensitize students to the similarities and difference between cultures by comparing the Shakespearean and the Bunraki/Kabuki dramas of Japan. In the lesson, the focus of this comparison is the complex nature of revenge explored in "The Tragedy of Hamlet, Prince of Denmark" and "Chusingura," or "The…

  8. You plan, you test and then it happens: Lessons learned from the Schneider warehouse tornado recovery.

    Science.gov (United States)

    Marotz, William T

    2017-12-01

    This paper is about the experience gained and lessons learned while dealing with the long-term recovery of Schneider's Port Logistics Division following extensive damage to three warehouse/ office facilities in Savannah, GA on 25th April, 2015. This paper will provide insight into how the initial assessments were handled, how the skill sets needed by the response teams were determined, and what further actions were triggered as more detailed information was received and assessed by the leadership team. This paper will also provide information as to how closely the company followed its existing contingency and disaster recovery plans, as well as where those plans fell short and where it was necessary to make adjustments as the recovery progressed.

  9. VVER operational safety improvements: lessons learnt from European co-operation and future research needs

    International Nuclear Information System (INIS)

    Pazdera, F.; Vasa, I.; Zd'arek, J.

    2003-01-01

    The paper summarises involvement of Nuclear Research Institute Rez (NRI) in the areas which are directly related to Reactor Operational Safety and Plant Life Management, it also gives an idea how results of the research projects can be used to enhance safety of VVER reactors. These issues are for many years subject of a wide international co-operation effort, covered by such programmes as PHARE, OECD/NEA TACIS, 5th Framework Programme. Nuclear Research Institute participated in the majority of these programmes and projects, which allowed us to evaluate benefits (especially for VVER reactors) of the projects already finalised or running, as well as to formulate so-called 'future research needs', which possibly may be pursued within 6th Framework Programme. The paper highlights the main features of some projects our Institute was and is involved in, emphasising the most important results, expectations and future needs. It also very briefly, deals with some general and particular lessons learnt within these projects and their application to VVER reactors, especially as to their safety improvement. The paper also mentions VVER-focused projects and activities, co-ordinated by the OECD, which should enable to extend multilateral contacts already existing between organisations of the EU countries to include organisations from Russia, USA, Japan and possibly some other countries

  10. Arizona Traffic Safety Education, K-8. Passenger Safety, Grade 3.

    Science.gov (United States)

    Mesa Public Schools, AZ.

    One in a series designed to assist Arizona elementary and junior high school teachers in developing children's traffic safety skills, this curriculum guide contains four lessons and an appendix of school bus safety tips for use in grade 3. Introductory information provided for the teacher includes basic highway safety concepts, stressing…

  11. Environment, safety and health progress assessment manual

    International Nuclear Information System (INIS)

    1992-12-01

    On June 27, 1989, the Secretary of Energy announced a 10-Point Initiative to strengthen environment, safety, and health (ES ampersand H) programs, and waste management activities at DOE production, research, and testing facilities. One of the points involved conducting dent Tiger Team Assessments of DOE operating facilities. The Office of Special independent Projects (OSP), EH-5, in the Office of the Assistant Secretary for Environment, Safety and Health, EH-1, was assigned the responsibility to conduct the Tiger Team Assessments. Through June 1992, a total of 35 Tiger Team Assessments were completed. The Secretary directed that Corrective Action Plans be developed and implemented to address the concerns identified by the Tiger Teams. In March 1991, the Secretary approved a plan for assessments that are ''more focused, concentrating on ES ampersand H management, ES ampersand H corrective actions, self-assessment programs, and root-cause related issues.'' In July 1991, the Secretary approved the initiation of ES ampersand H Progress Assessments, as a followup to the Tiger Team Assessments, and in the continuing effort to institutionalize the self-assessment process and line management accountability in the ES ampersand H areas. This manual documents the processes to be used to perform the ES ampersand H Progress Assessments. It was developed based upon the lessons learned from Tiger Team Assessments, the two pilot Progress Assessments, and Progress Assessments that have been completed. The manual will be updated periodically to reflect lessons learned or changes in policy

  12. Addressing conflicts of interest in nanotechnology oversight: lessons learned from drug and pesticide safety testing

    International Nuclear Information System (INIS)

    Elliott, Kevin C.; Volz, David C.

    2012-01-01

    Financial conflicts of interest raise significant challenges for those working to develop an effective, transparent, and trustworthy oversight system for assessing and managing the potential human health and ecological hazards of nanotechnology. A recent paper in this journal by Ramachandran et al., J Nanopart Res, 13:1345–1371 (2011) proposed a two-pronged approach for addressing conflicts of interest: (1) developing standardized protocols and procedures to guide safety testing; and (2) vetting safety data under a coordinating agency. Based on past experiences with standardized test guidelines developed by the international Organization for Economic Cooperation and Development (OECD) and implemented by national regulatory agencies such as the U.S. Environmental Protection Agency (EPA) and Food and Drug Administration (FDA), we argue that this approach still runs the risk of allowing conflicts of interest to influence toxicity tests, and it has the potential to commit regulatory agencies to outdated procedures. We suggest an alternative approach that further distances the design and interpretation of safety studies from those funding the research. In case the two-pronged approach is regarded as a more politically feasible solution, we also suggest three lessons for implementing this strategy in a more dynamic and effective manner.

  13. Addressing conflicts of interest in nanotechnology oversight: lessons learned from drug and pesticide safety testing

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Kevin C., E-mail: ke@sc.edu [University of South Carolina, Department of Philosophy, USC NanoCenter (United States); Volz, David C. [University of South Carolina, Department of Environmental Health Sciences, Arnold School of Public Health (United States)

    2012-01-15

    Financial conflicts of interest raise significant challenges for those working to develop an effective, transparent, and trustworthy oversight system for assessing and managing the potential human health and ecological hazards of nanotechnology. A recent paper in this journal by Ramachandran et al., J Nanopart Res, 13:1345-1371 (2011) proposed a two-pronged approach for addressing conflicts of interest: (1) developing standardized protocols and procedures to guide safety testing; and (2) vetting safety data under a coordinating agency. Based on past experiences with standardized test guidelines developed by the international Organization for Economic Cooperation and Development (OECD) and implemented by national regulatory agencies such as the U.S. Environmental Protection Agency (EPA) and Food and Drug Administration (FDA), we argue that this approach still runs the risk of allowing conflicts of interest to influence toxicity tests, and it has the potential to commit regulatory agencies to outdated procedures. We suggest an alternative approach that further distances the design and interpretation of safety studies from those funding the research. In case the two-pronged approach is regarded as a more politically feasible solution, we also suggest three lessons for implementing this strategy in a more dynamic and effective manner.

  14. Addressing conflicts of interest in nanotechnology oversight: lessons learned from drug and pesticide safety testing

    Science.gov (United States)

    Elliott, Kevin C.; Volz, David C.

    2012-01-01

    Financial conflicts of interest raise significant challenges for those working to develop an effective, transparent, and trustworthy oversight system for assessing and managing the potential human health and ecological hazards of nanotechnology. A recent paper in this journal by Ramachandran et al., J Nanopart Res, 13:1345-1371 (2011) proposed a two-pronged approach for addressing conflicts of interest: (1) developing standardized protocols and procedures to guide safety testing; and (2) vetting safety data under a coordinating agency. Based on past experiences with standardized test guidelines developed by the international Organization for Economic Cooperation and Development (OECD) and implemented by national regulatory agencies such as the U.S. Environmental Protection Agency (EPA) and Food and Drug Administration (FDA), we argue that this approach still runs the risk of allowing conflicts of interest to influence toxicity tests, and it has the potential to commit regulatory agencies to outdated procedures. We suggest an alternative approach that further distances the design and interpretation of safety studies from those funding the research. In case the two-pronged approach is regarded as a more politically feasible solution, we also suggest three lessons for implementing this strategy in a more dynamic and effective manner.

  15. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  16. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  17. Design lessons from using programmable controllers in the MFTF-B personnel safety and interlocks system

    International Nuclear Information System (INIS)

    Branum, J.D.

    1983-01-01

    Applying programmable controllers in critical applications such as personnel safety and interlocks systems requires special considerations in the design of both hardware and software. All modern programmable controller systems feature extensive internal diagnostic capabilities to protect against problems such as program memory errors; however most, if not all present designs lack an intrinsic capability for detecting and countering failures on the field-side of their I/O modules. Many of the most common styles of I/O modules can also introduce potentially dangerous sneak circuits, even without component failure. This paper presents the most significant lessons learned to date in the design of the MFTF-B Personnel Safety and Interlocks System, which utilizes two non-redundant programmable controllers with over 800 I/O points each. Specific problems recognized during the design process as well as those discovered during initial testing and operation are discussed along with their specific solutions in hardware and software

  18. Developing Effective Corrective Action Plan in Krsko NPP

    International Nuclear Information System (INIS)

    Bach, Bruno; Cizmek, Rudi; Bozin, Bojan

    2014-01-01

    Experience shows that many events could have been prevented if lessons had been learned from previous incidents. Event reporting thus has become an increasingly important aspect of the operation and regulation of all safety-related and public health industries. Different industries such as aeronautics, chemicals, transport and of course nuclear depend on Operating Experience (OE) feedback programs to provide lessons learned about safety. The information available under an OE programme for these organizations comprises internal event reports and analysis and external operating experience including reports on low level events and near misses and other relevant operating performance information. The worldwide OE programme (such as WANO OE) in nuclear power plants provides opportunity to learn from events at other plants. In particular, it alerts plants to mistakes or events that have occurred at other nuclear power plants and enables them to take corrective actions to prevent similar occurrences at their own plant. The intent of the effective and efficient OE program is therefore to improve personnel/plant safety, reliability and commercial performance of the operating nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff and to the relevant national and international organizations and corrective actions are effectively implemented. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed its own OE program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The OE is a part of the Corrective Action Program (CAP), which is among top management programs. The purpose of this article is to present a part of the Krško NPP

  19. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  20. Safety considerations for graphene: lessons learnt from carbon nanotubes.

    Science.gov (United States)

    Bussy, Cyrill; Ali-Boucetta, Hanene; Kostarelos, Kostas

    2013-03-19

    Many consider carbon nanomaterials the poster children of nanotechnology, attracting immense scientific interest from many disciplines and offering tremendous potential in a diverse range of applications due to their extraordinary properties. Graphene is the youngest in the family of carbon nanomaterials. Its isolation, description, and mass fabrication has followed that of fullerenes and carbon nanotubes. Graphene's development and its adoption by many industries will increase unintended or intentional human exposure, creating the need to determine its safety profile. In this Account, we compare the lessons learned from the development of carbon nanotubes with what is known about graphene, based on our own investigations and those of others. Despite both being carbon-based, nanotubes and graphene are two very distinct nanomaterials. We consider the key physicochemical characteristics (structure, surface, colloidal properties) for graphene and carbon nanotubes at three different physiological levels: cellular, tissue, and whole body. We summarize the evidence for health effects of both materials at all three levels. Overall, graphene and its derivatives are characterized by a lower aspect ratio, larger surface area, and better dispersibility in most solvents compared to carbon nanotubes. Dimensions, surface chemistry, and impurities are equally important for graphene and carbon nanotubes in determining both mechanistic (aggregation, cellular processes, biodistribution, and degradation kinetics) and toxicological outcomes. Colloidal dispersions of individual graphene sheets (or graphene oxide and other derivatives) can easily be engineered without metallic impurities, with high stability and less aggregation. Very importantly, graphene nanostructures are not fiber-shaped. These features theoretically offer significant advantages in terms of safety over inhomogeneous dispersions of fiber-shaped carbon nanotubes. However, studies that directly compare graphene with

  1. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  2. 76 FR 55056 - Toy Safety Standard: Strategic Outreach and Education Plan

    Science.gov (United States)

    2011-09-06

    ... to test and certify to the toy safety standard. We plan to use traditional and social media to... testing and certification requirements for children's toys and toy chests and their compliance with ASTM... manufacturers of children's toys must ensure that covered toys are tested for compliance with the toy safety...

  3. 12 CFR 263.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... member bank will take to correct the deficiency and the time within which those steps will be taken. (c... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Submission and Review of Safety and Soundness... safety and soundness compliance plan. (a) Schedule for filing compliance plan—(1) In general. A State...

  4. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  5. A tailored online safety and health intervention for women experiencing intimate partner violence: the iCAN Plan 4 Safety randomized controlled trial protocol

    Directory of Open Access Journals (Sweden)

    Marilyn Ford-Gilboe

    2017-03-01

    Full Text Available Abstract Background Intimate partner violence (IPV threatens the safety and health of women worldwide. Safety planning is a widely recommended, evidence-based intervention for women experiencing IPV, yet fewer than 1 in 5 Canadian women access safety planning through domestic violence services. Rural, Indigenous, racialized, and immigrant women, those who prioritize their privacy, and/or women who have partners other than men, face unique safety risks and access barriers. Online IPV interventions tailored to the unique features of women’s lives, and to maximize choice and control, have potential to reduce access barriers, and improve fit and inclusiveness, maximizing effectiveness of these interventions for diverse groups. Methods/Design In this double blind randomized controlled trial, 450 Canadian women who have experienced IPV in the previous 6 months will be randomized to either a tailored, interactive online safety and health intervention (iCAN Plan 4 Safety or general online safety information (usual care. iCAN engages women in activities designed to increase their awareness of safety risks, reflect on their plans for their relationships and priorities, and create a personalize action plan of strategies and resources for addressing their safety and health concerns. Self-reported outcome measures will be collected at baseline and 3, 6, and 12 months post-baseline. Primary outcomes are depressive symptoms (Center for Epidemiological Studies Depression Scale, Revised and PTSD Symptoms (PTSD Checklist, Civilian Version. Secondary outcomes include helpful safety actions, safety planning self-efficacy, mastery, and decisional conflict. In-depth qualitative interviews with approximately 60 women who have completed the trial and website utilization data will be used to explore women’s engagement with the intervention and processes of change. Discussion This trial will contribute timely evidence about the effectiveness of online safety and

  6. Oil prices: demand and supply. Lesson plan

    OpenAIRE

    anonymous

    2005-01-01

    Upon completion of this lesson, students will be able to list the determinants of demand and supply, recognize which factors will cause demand curves or supply curves to shift, determine equilibrium using a demand/supply graph, and show the effects on price and quantity when equilibrium changes.

  7. Safety evaluation report on Tennessee Valley Authority: Watts Bar Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This safety evaluation report on the information submitted by the Tennessee Valley Authority in its Nuclear Performance Plan for the Watts Bar Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific corrective actions as part of the recovery program for licensing of Unit 1. The staff will be monitoring and inspecting the implementation of the programs. The plan does not address all licensing matters that will be required for fuel load and operation of Unit 1. Those remaining licensing matters have been addressed in previous safety evaluations or will be addressed in accordance with routing NRC licensing practices. 97 refs

  8. Gross Domestic Pizza. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Zaleskiene, Irena; Venger, Anatoly; MacDonald, Rich; Davis, Debbie

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a lesson description; appropriate age level; economic concepts; content standards and benchmarks; related subject areas; instructional objectives; time…

  9. Pacemaker Primary Curriculum; Lesson Book Level B.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the second in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subjects areas on the primary grade level: arithmetic, reading, vocabulary, listening, planning, problem solving, social behavior, art, music, and…

  10. Pacemaker Primary Curriculum; Lesson Book Level C.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the third in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subject areas on the primary grade level: arithmetic, reading, vocabulary, spelling, printing, listening, planning, problem solving, social behavior,…

  11. Pacemaker Primary Curriculum; Lesson Book Level D.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the last in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subject areas on the primary level: arithmetic, reading, vocabulary, spelling, printing, listening, planning and problem solving, social behavior,…

  12. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  13. Is it necessary to plan with safety margins for actively scanned proton therapy?

    Science.gov (United States)

    Albertini, F.; Hug, E. B.; Lomax, A. J.

    2011-07-01

    In radiation therapy, a plan is robust if the calculated and the delivered dose are in agreement, even in the case of different uncertainties. The current practice is to use safety margins, expanding the clinical target volume sufficiently enough to account for treatment uncertainties. This, however, might not be ideal for proton therapy and in particular when using intensity modulated proton therapy (IMPT) plans as degradation in the dose conformity could also be found in the middle of the target resulting from misalignments of highly in-field dose gradients. Single field uniform dose (SFUD) and IMPT plans have been calculated for different anatomical sites and the need for margins has been assessed by analyzing plan robustness to set-up and range uncertainties. We found that the use of safety margins is a good way to improve plan robustness for SFUD and IMPT plans with low in-field dose gradients but not necessarily for highly modulated IMPT plans for which only a marginal improvement in plan robustness could be detected through the definition of a planning target volume.

  14. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  15. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  16. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  17. Knowledge and Cognitive Process Dimensions of Technology Teachers' Lesson Objectives

    Science.gov (United States)

    Mathumbu, David; Rauscher, Willem; Braun, Max

    2014-01-01

    A clearly stated lesson objective is considered an essential component of a well-planned lesson. Many teachers of Technology, a relatively new subject in South African schools, teach Technology with rather limited training both in content and methodological approaches. This study sought to investigate and classify lesson objectives framed or…

  18. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  19. Urban planning, traffic planning and traffic safety of pedestrians and cyclists : report presented to the 1979 Road Research Symposium on Safety of Pedestrians and Cyclists, OECD Headquarters, Paris, 14-16 May 1979. Session III: Physical Countermeasures; Subsession III.1: Urban planning and traffic planning.

    NARCIS (Netherlands)

    Wegman, F.C.M.

    1979-01-01

    The traffic safety of pedestrians and cyclists can be improved by means of urban planning and traffic planning, as one of the possibilities. This paper discusses the framework of these measures and activities and also the effects on the field of traffic planning. Chapter I show that it is not

  20. More than Solfège and Hand Signs: Philosophy, Tools, and Lesson Planning in the Authentic Kodály Classroom

    Science.gov (United States)

    Bowyer, James

    2015-01-01

    Four components of the Kodály concept are delineated here: philosophy, objectives, essential tools, and lesson planning process. After outlining the tenets of the Kodály philosophy and objectives, the article presents the Kodály concept's essential tools, including singing, movable "do" solfège, rhythm syllables, hand signs, singing on…

  1. Saving Resources - Lesson plan of ESD in Geography

    Science.gov (United States)

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  2. The Global Polio Eradication Initiative: Progress, Lessons Learned, And Polio Legacy Transition Planning.

    Science.gov (United States)

    Cochi, Stephen L; Hegg, Lea; Kaur, Anjali; Pandak, Carol; Jafari, Hamid

    2016-02-01

    The world is closer than ever to achieving global polio eradication, with record-low polio cases in 2015 and the impending prospect of a polio-free Africa. Tens of millions of volunteers, social mobilizers, and health workers have participated in the Global Polio Eradication Initiative. The program contributes to efforts to deliver other health benefits, including health systems strengthening. As the initiative nears completion after more than twenty-five years, it becomes critical to document and transition the knowledge, lessons learned, assets, and infrastructure accumulated by the initiative to address other health goals and priorities. The primary goals of this process, known as polio legacy transition planning, are both to protect a polio-free world and to ensure that investments in polio eradication will contribute to other health goals after polio is completely eradicated. The initiative is engaged in an extensive transition process of consultations and planning at the global, regional, and country levels. A successful completion of this process will result in a well-planned and -managed conclusion of the initiative that will secure the global public good gained by ending one of the world's most devastating diseases and ensure that these investments provide public health benefits for years to come. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Demonstration of safety of decommissioning of facilities using radioactive material

    International Nuclear Information System (INIS)

    Batandjieva, Borislava; O'Donnell, Patricio

    2008-01-01

    Full text:The development of nuclear industry worldwide in the recent years has particular impact on the approach of operators, regulators and interested parties to the implementation of the final phases (decommissioning) of all facilities that use radioactive material (from nuclear power plants, fuel fabrication facilities, research reactors to small research or medical laboratories). Decommissioning is becoming an increasingly important activity for two main reasons - termination of the practice in a safe manner with the view to use the facility or the site for other purposes, or termination of the practice and reuse the facility or site for new built nuclear facilities. The latter is of special relevance to multi-facility sites where for example new nuclear power plants and envisaged. However, limited countries have the adequate legal and regulatory framework, and experience necessary for decommissioning. In order to respond to this challenge of the nuclear industry and assist Member States in the adequate planning, conduct and termination of decommissioning of wide range of facilities, over the last decade the IAEA has implemented and initiated several projects in this field. One of the main focuses of this assistance to operators, regulators and specialists involved in decommissioning is the evaluation and demonstration of safety of decommissioning. This importance of these Agency activities was also highlighted in the International Action Plan on Decommissioning, during the second Joint Convention meeting in 2006 and the International Conference on Lessons Learned from Decommissioning in Athens in 2006. The IAEA has been providing technical support to its Member States in this field through several mechanisms: (1) the establishment of a framework of safety standards on decommissioning and development of a supporting technical documents; (2) the establishment of an international peer review mechanism for decommissioning; (3) the technical cooperation projects

  4. Jackie Steals Home. Learning Page Lesson Plan.

    Science.gov (United States)

    Pulda, Arnold

    In this lesson, students draw on their previous studies of American history and culture as they analyze primary sources from "Jackie Robinson and Other Baseball Highlights, 1860s-1960s" in the American Memory collection. A close reading of two documents relating to Jackie Robinson's breaking of the racial barrier in professional baseball…

  5. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  6. LESSONS LEARNED IN DEVELOPMENT OF THE HANFORD SWOC MASTER DOCUMENTED SAFETY ANALYSIS (MDSA) and IMPLEMENTATION VALIDATION REVIEW (IVR)

    International Nuclear Information System (INIS)

    MORENO, M.R.

    2004-01-01

    DOE set clear expectations on a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (20 CFR 830, Nuclear Safety Rule), which ensured long-term benefit to Hanford, via issuance of a nuclear safety strategy in February 2003. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development with the goal of a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was approved to standardize methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was approved for the evaluation of radiological consequences for accident scenarios often postulated at Hanford. Standard safety management program chapters were approved for use as a means of compliance with the programmatic chapters of DOE-STD-3009, ''Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports''. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. The new Documented Safety Analysis (DSA) developed to address the operations of four facilities within the Solid Waste Operations Complex (SWOC) necessitated development of an Implementation Validation Review (IVR) process. The IVR process encompasses the following objectives: safety basis controls and requirements are adequately incorporated into appropriate facility documents and work instructions, facility personnel are knowledgeable of controls and requirements, and the DSA/TSR controls have been implemented. Based on DOE direction and safety analysis tools, four waste management nuclear facilities were integrated into one safety basis document. With successful completion of implementation of this safety document, lessons-learned from the in-process review, safety analysis tools and IVR process were documented for future action

  7. Resources to Support Faculty Writing Data Management Plans: Lessons Learned from an Engineering Pilot

    Directory of Open Access Journals (Sweden)

    Natsuko H. Nicholls

    2014-07-01

    Full Text Available Recent years have seen a growing emphasis on the need for improved management of research data. Academic libraries have begun to articulate the conceptual foundations, roles, and responsibilities involved in data management planning and implementation. This paper provides an overview of the Engineering data support pilot at the University of Michigan Library as part of developing new data services and infrastructure. Through this pilot project, a team of librarians had an opportunity to identify areas where the library can play a role in assisting researchers with data management, and has put forth proposals for immediate steps that the library can take in this regard. The paper summarizes key findings from a faculty survey and discusses lessons learned from an analysis of data management plans from accepted NSF proposals. A key feature of this Engineering pilot project was to ensure that these study results will provide a foundation for librarians to educate and assist researchers with managing their data throughout the research lifecycle.

  8. Computer-based lesson planning for the subject of Islamic Culture History

    Directory of Open Access Journals (Sweden)

    Guntur Cahyono

    2017-08-01

    Full Text Available Abstract This study aims to describe the planning, implementation, evaluation, constraints and advantages of computer utilization in the History of Islamic Culture subject in MAN Salatiga. This research is a field study, aimed at studying intensively the background, current state, and environmental interaction of a social unit. Viewed from the type of data collected, this research is included in the category of qualitative research. Qualitative research is a research procedure that produces descriptive data in the form of written or spoken words from the people, or their behavior that can be observed. Subjects of this study are teachers and students. Data collection techniques used are observation, interviews, and documentation. Data analysis uses data reduction, data presentation, and conclusions. The results of this study indicate that the planning is done by classroom teachers by making lesson plan based on 2013 Curriculum guideline. Teachers have written the utilization of computers on the lesson plan components. Utilization of computers in the classroom is as a medium and the one in the computer laboratory as media and learning resources. Computers are used as a substitute for books due to their limited availability. It is also practiced as a habituation for preparing the computer-based national examination (UNBK.   Keywords: computer utilization, learning, history of Islamic culture subject   Abstrak Penelitian ini bertujuan untuk mendeskripsikan perencanaan, pelaksanaan, evaluasi, kendala dan kelebihan pemanfaatan komputer dalam pembelajaran mata pelajaran Sejarah Kebudayaan Islam di MAN Salatiga. Penelitian ini merupakan penelitian lapangan bertujuan mempelajari secara intensif latar belakang, keadaan sekarang, dan interaksi lingkungan suatu unit sosial. Jika dilihat dari jenis data yang dikumpulkan, maka penelitian ini termasuk dalam kategori penelitian kualitatif. Penelitian kualitatif sebagai prosedur penelitian yang menghasilkan

  9. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  10. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  11. Modernization of Unit 2 at Oskarshamn NPP- Main Objectives, Experience from Design, Separation of Operational and Nuclear Safety Equipment - Lessons Learned

    International Nuclear Information System (INIS)

    Kanaan, Salah K.

    2015-01-01

    This paper aims to give a picture of Oskarshamn Nuclear Power Plant (OKG) experience from design for one of the biggest modernization project in the world and focuses on what was learned that is specific to robustness of electrical power systems, especially through Fukushima Station Blackout (SBO). The planning for unit 2 at OKG was initiated in 1967 and the plant was completed on time and was synchronized to the grid October 2, 1974 and is of type BWR. Unit 2 was originally on 580 MW. In 1982 a thermal power up-rate was performed, from 1700 MWh to 1800 MWh (106% reactor output). A decision was made to perform a modernization and a new power up-rate to 850 MW and there were several reasons for this decision; New safety regulations from Swedish Radiation Safety Authority (SSM), Ageing of important components and the initial focus was on safety and availability - Project Plant Life Extension (Plex) was established and became the largest nuclear power modernization in the world. The modernization will lead to: - New safety concept with 4 divisions instead for existing 2 with 2 new buildings South Electrical Building (SEB) and North Electrical Building (NEB); - Completely new software - based equipments for monitoring, control and I and C; - New Low Pressure Turbine, new generator and main transformer; - New MCR and simulator; - Compliance with modern reactor safety requirements; - Redundancy, Separation, Diversification, Earthquake; - Reinforcement of existing safety functions; - New Electricity - I and C (electric power incl. reinforced emergency power and control systems); - New buildings for Electricity - I and C; - Reinforcement of existing process systems as well as installation of new ones. Based on studies and good experiences on how to separate the operational and the safety equipment, the project led to a completely new safety concept. The safety concept is based on fully understanding the safety system that shall encompass all of the elements required to

  12. International Symposium on Nuclear Safety

    International Nuclear Information System (INIS)

    2013-03-01

    Nuclear Regulatory Authority of the Slovak Republic and the Embassy of Japan in the Slovak Republic, under the auspices of the Deputy Prime Minister and Minister of Foreign and European Affairs Mr Lajcak organized International Symposium on Nuclear Safety on 14 and 15 March 2013. The symposium took place almost exactly two years after the occurrence of accidents at the Japanese nuclear power plant Fukushima Daichi. The main mission of the symposium was an attempt to contribute to the improvement of nuclear safety by sharing information and lessons presented by Japanese experts with experts from the region, the International Atomic Energy Agency (IAEA) and the European Commission. The aim of the symposium, unlike many other events organized in connection with the events in Fukushima Daichi NPP, was a summary of the results of stress tests and measures update adopted by the international community, especially within Europe. Panel discussion was included to the program of the symposium for this aim was, mainly focused on the current state of implementation of the National Action Plan of the Slovak Republic, the Czech Republic, Poland, Ukraine and Switzerland and the IAEA Action Plan.

  13. Lessons learned from Three Mile Island (TMI), USNRC long-term trends, industry response

    International Nuclear Information System (INIS)

    Szalay, R.A.

    1981-01-01

    Studies resulting from Three Mile Island (TMI) showed that corrections were needed in information processing, operator training and procedures, and certain aspects of the safety review process. These have been undertaken by industry and NRC and the results are positive. New safety instructions have been set up. The Nuclear Safety Analysis Center (NSAC) is providing a focus for analysis of issues which have generic elements affecting a number of plants of similar or related design. The Institute of Nuclear Power Operations (INPO) is setting industry standards for training and certification of operators and supervisory personnel, and for training of the managerial chain which oversees safety practices. Changes in procedures and in some design features called for in the recommendations of the NRC Lessons Learned Task Force (NUREG-0578) have been simplemented by utilities. Other requirements included in the NRC Action Plan (NUREG-0660) and its companion document clarification of TMI Action Plan Requirements (NUREG-0737), are also being addressed. Improved operator training and emergency procedures provide a continuing opportunity to make safety gains. Problems remain to be faced in the regulatory and political arenas. The long-term licensing trend will be affected by the manner in which degraded core issues and the development of a safety goal proceed. The Industry Degraded Core Rulemaking (IDCOR) program has been undertaken to develop the nuclear industry's position in anticipation of an impending rulemaking. Both industry and NRC are working on the development of a safety goal and standard risk assessment methodology. (AF)

  14. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  15. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  16. A Model of Microteaching Lesson Study Implementation in the Prospective History Teacher Education

    Science.gov (United States)

    Utami, Indah Wahyu Puji; Mashuri; Nafi'ah, Ulfatun

    2016-01-01

    Microteaching lesson study is a model to improve prospective teacher quality by incorporating several element of microteaching and lesson study. This study concern on the implementation of microteaching lesson study in prospective history teacher education. Microteaching lesson study model implemented in this study consist of three stages: plan,…

  17. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  18. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  19. The Fukushima Daiichi Nuclear Power Plant Accident: OECD/NEA Nuclear Safety Response and Lessons Learnt

    International Nuclear Information System (INIS)

    2013-01-01

    research programmes designed to improve understanding of how the accident progressed as well as to obtain safety-related information during the decommissioning and dismantling of the damaged facilities. This report outlines international efforts to strengthen nuclear regulation, safety, research and radiological protection in the post-Fukushima context. It also highlights key messages and lessons learnt, notably as related to assurance of safety, shared responsibilities, human and organisational factors, defence-in-depth, stakeholder engagement, crisis communication and emergency preparedness

  20. Progress of experimental research on nuclear safety in NPIC

    Energy Technology Data Exchange (ETDEWEB)

    Gong, Houjun; Zan, Yuanfeng; Peng, Chuanxin; Xi, Zhao; Zhang, Zhen; Wang, Ying; He, Yanqiu; Huang, Yanping [Nuclear Power Institute of China, Chengdu (China)

    2016-05-15

    Two kinds of Generation III commercial nuclear power plants have been developed in CNNC (China National Nuclear Corporation), one is a small modular reactor ACP100 having an equivalent electric power 100 MW, and the other is HPR1000 (once named ACP1000) having an equivalent electric power 1 000 MW. Both NPPs widely adopted the design philosophy of advanced passive safety systems and considered the lessons from Fukushima Daichi nuclear accident. As the backbone of the R and D of ACP100 and HPR1000, NPIC (Nuclear power Institute of China) has finished the engineering verification test of main safety systems, including passive residual heat removal experiments, reactor cavity injection experiments, hydrogen combustion experiments, and passive autocatalytic recombiner experiments. Above experimental work conducted in NPIC and further research plan of nuclear safety are introduced in this paper.

  1. System safety program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1976-01-01

    The safety engineering effort to be undertaken in achieving an acceptable level of safety in the Brayton Isotope Power System (BIPS) development program is discussed. The safety organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are described. The plan will be updated periodically as the need arises

  2. The Level and Quality of Accountability Talk in the Science Lessons

    Science.gov (United States)

    Motlhabane, Abraham

    2016-01-01

    Teachers are actively encouraged to plan their lessons such that there is maximum classroom talk, namely accountability talk. However, many lessons do not display sufficient accountability talk. This study attempted to better understand the level and quality of accountability talk in six science lessons. The study aimed to provide teachers with…

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  4. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  5. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  6. Reperes, the information magazine of the Institute for Radiation Protection and Nuclear Safety - IRSN, No. 12 - January 2012, Special issue Fukushima - First lessons from the accident

    International Nuclear Information System (INIS)

    2012-01-01

    A first set of articles addresses the nuclear crisis in Japan (description of the accident, information mission sent by France, and support actions undertaken by France in Japan in the fields of education, civilian security, culture, sailing, media, dosimeters, robotics). A second set discusses lessons learned in terms of nuclear safety (complementary safety assessments, stress test in Gravelines), radiological consequences (impact on Japanese population, the Symbiose software, the Teleray network), crisis management, and research

  7. Sexual Safety Planning as an HIV Prevention Strategy for Survivors of Domestic Violence.

    Science.gov (United States)

    Foster, Jill; Núñez, Ana; Spencer, Susan; Wolf, Judith; Robertson-James, Candace

    2016-06-01

    Victims of domestic violence (DV) are not only subject to physical and emotional abuse but may also be at increased risk for less recognized dangers from infection with human immunodeficiency virus (HIV) and other sexually transmitted pathogens. Because of the close link between DV and sexual risk, women need to be educated about the consequences of acquiring a life-threatening sexually transmitted infection, risk reduction measures, and how to access appropriate HIV services for diagnosis and treatment. It is therefore critical for DV workers to receive sufficient training about the link between DV and HIV risk so that sexual safety planning can be incorporated into activities with their clients in the same way as physical safety plans. In this article, we discuss how the Many Hands Working Together project provides interactive training for workers in DV and DV-affiliated agencies to increase their knowledge about HIV and teach sexual safety planning skills to achieve HIV risk reduction.

  8. Safety upgrading activities against tsunami, earthquake, and severe accident at Hamaoka NPPs

    International Nuclear Information System (INIS)

    Watanabe, Tetsuya; Wakunaga, Takao; Ishida, Takahisa

    2013-01-01

    As the lessons learned by the Fukushima Daiichi NPPs accident, Chubu Electric Power carried out the Emergency Safety Measures at Hamaoka NPPs immediately, and announced the plan for tsunami countermeasures including the construction of 18m-height tsunami protection wall in July 2011. Furthermore, the company announced the additional severe accident and tsunami countermeasures, and etc. in December 2012 and in April 2013, such as the installation of Filtered Containment Venting System and increasing the height of the tsunami protection wall from 18m to 22m. In this paper, we present major safety upgrading activities against tsunami, earthquake and severe accident at Hamaoka NPPs. (author)

  9. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  10. Couriers in the Inca Empire: Getting Your Message Across. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson shows how the Inca communicated across the vast stretches of their mountain realm, the largest empire of the pre-industrial world. The lesson explains how couriers carried messages along mountain-ridge roads, up and down stone steps, and over chasm-spanning footbridges. It states that couriers could pass a message from Quito (Ecuador)…

  11. Higher Education ERP: Lessons Learned.

    Science.gov (United States)

    Swartz, Dave; Orgill, Ken

    2001-01-01

    Shares experiences and lessons learned by chief information officers of large universities about enterprise resource planning (ERP). Specifically, provides a framework for approaching an ERP that could save universities millions of dollars. (EV)

  12. 78 FR 979 - Petition for Positive Train Control Safety Plan Approval and System Certification of the...

    Science.gov (United States)

    2013-01-07

    ...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP) approval and system certification of the Electronic Train Management System (ETMS) as required by 49 U.S.C...

  13. Jefferson Proving Ground, South of the Firing Line Health and Safety Plan, Volume 4

    National Research Council Canada - National Science Library

    1992-01-01

    .... The purpose of this Site Health and Safety Plan (SHSP) is to assign SECD personnel health and safety responsibilities, to prescribe mandatory operating procedures, and to establish personal-protective-equipment (PPE...

  14. [Heritage Education Lesson Plans and Slide Presentations].

    Science.gov (United States)

    Van Buren, Maurie

    Field tested in 27 schools and in grades four through twelve, this teaching unit stresses heritage education through the study of southern U.S. architectural styles for homes from the pioneer log structures to the 1950s ranch home. Each of the four lessons in this unit focuses around a slide presentation of 20 slides designed to fit into one…

  15. Applying lessons learned from the USAID family planning graduation experience to the GAVI graduation process.

    Science.gov (United States)

    Shen, Angela K; Farrell, Marguerite M; Vandenbroucke, Mary F; Fox, Elizabeth; Pablos-Mendez, Ariel

    2015-07-01

    As low income countries experience economic transition, characterized by rapid economic growth and increased government spending potential in health, they have increased fiscal space to support and sustain more of their own health programmes, decreasing need for donor development assistance. Phase out of external funds should be systematic and efforts towards this end should concentrate on government commitments towards country ownership and self-sustainability. The 2006 US Agency for International Development (USAID) family planning (FP) graduation strategy is one such example of a systematic phase-out approach. Triggers for graduation were based on pre-determined criteria and programme indicators. In 2011 the GAVI Alliance (formerly the Global Alliance for Vaccines and Immunizations) which primarily supports financing of new vaccines, established a graduation policy process. Countries whose gross national income per capita exceeds $1570 incrementally increase their co-financing of new vaccines over a 5-year period until they are no longer eligible to apply for new GAVI funding, although previously awarded support will continue. This article compares and contrasts the USAID and GAVI processes to apply lessons learned from the USAID FP graduation experience to the GAVI process. The findings of the review are 3-fold: (1) FP graduation plans served an important purpose by focusing on strategic needs across six graduation plan foci, facilitating graduation with pre-determined financial and technical benchmarks, (2) USAID sought to assure contraceptive security prior to graduation, phasing out of contraceptive donations first before phasing out from technical assistance in other programme areas and (3) USAID sought to sustain political support to assure financing of products and programmes continue after graduation. Improving sustainability more broadly beyond vaccine financing provides a more comprehensive approach to graduation. The USAID FP experience provides a

  16. Nuclear safety cooperation in Southeast Asia. Lessons from Asia's regional networks

    International Nuclear Information System (INIS)

    Trajano, Julius Cesar I.

    2017-01-01

    Debate has been ongoing among key stakeholders on whether South-east Asia should use or reject nuclear power. However, there are still significant regional concerns over nuclear safety and security in South-east Asia. As some ASEAN countries plan to pursue nuclear power, they need to create and maintain a pool of local nuclear professionals with actual relevant experience in the nuclear industry. While the IAEA does not influence a country's decision on introducing nuclear power, it supports Member States' efforts to evaluate all options towards making a knowledgeable decision. Nuclear safety is the responsibility of every nation that utilizes nuclear technology. National governments are responsible for regulations that govern how safety at nuclear facilities is maintained, as well as to reduce radiation risks, including emergency response and recovery actions. But nuclear energy has transboundary/ regional implications if nuclear safety in each member state is not strengthened. ASEAN countries share a common goal in achieving high level of public safety and confidence in nuclear and radiation related issues. Can regional cooperation help ASEAN Member-States strengthen nuclear safety? The paper examines the importance of regional cooperation on nuclear energy governance and the role of regional organisations in Asia in strengthening nuclear safety cooperation and emergency preparedness and response in Southeast Asia. (author)

  17. Annual plan of research on safety techniques against low level radioactive wastes, 1984-1988

    International Nuclear Information System (INIS)

    1984-01-01

    The establishment of the countermeasures for treating and disposing radioactive wastes has become an important subject for promoting the utilization of atomic energy. Especially as to low level radioactive wastes, the cumulative quantity has reached about 460,000 in terms of 200 l drums as of the end of March, 1983, and accompanying the development of the utilization of atomic energy, its rapid increase is expected. So far, as for the disposal of low level radioactive wastes, the research and development and the preparation of safety criteria and safety evaluation techniques have been carried out, following the basic policy of the Atomic Energy Commission to execute land disposal and ocean disposal in combination, first to make the test disposal after preliminary safety evaluation, and to shift to the full scale disposal based on the results. The annual plan was decided on July 22, 1983, and the first revision was carried out this time, therefore, it is reported here. The basic policy of establishing this annual plan, and the annual plan for safety technique research are described. (Kako, I.)

  18. Towards a lessons learned system for critical software

    International Nuclear Information System (INIS)

    Andrade, J.; Ares, J.; Garcia, R.; Pazos, J.; Rodriguez, S.; Rodriguez-Paton, A.; Silva, A.

    2007-01-01

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists

  19. Towards a lessons learned system for critical software

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: jag@udc.es; Ares, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: juanar@udc.es; Garcia, R. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: rafael@udc.es; Pazos, J. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: jpazos@fi.upm.es; Rodriguez, S. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: santi@udc.es; Rodriguez-Paton, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: arpaton@fi.upm.es; Silva, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: asilva@fi.upm.es

    2007-07-15

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists.

  20. The International Technical Safety Forum

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The International Technical Safety Forum is a meeting of safety experts from several physics labs in Europe and the US. Since 1998 participants have been meeting every couple of years to discuss common challenges in safety matters. The Forum helps them define best practices and learn from the important lessons learned by others.   The Forum's participants in front of building 40. This year, the meeting took place at CERN from 12 to 16 April. “This year's meeting covered subjects ranging from communication and training in matters of safety, to cryogenic safety, emergency preparedness and risk analysis”, explains Ralf Trant, head of the CERN Safety Commission and organiser of this year’s Forum. Radiation protection issues are not discussed at the meeting since they involve different expertise. The goal of the Forum is to allow participants to share experience, learn lessons and acquire specific knowledge in a very open way. Round-table discussions, dedicated time for ...

  1. Identification of training and emergency-planning needs through job-safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Veltrie, J.

    1987-01-01

    Training and emergency-planning needs within the photovoltaic industry may be more accurately determined through the performance of detailed job-safety analysis. This paper outlines the four major components of such an analysis, namely operational review, hazards evaluation, personnel review and resources evaluation. It then shows how these may be developed into coherent training and planning recommendations, for both emergency and non-emergency situations.

  2. Introduction to the Tort of Negligence as It Pertains to the Medical Office. Medical Law and Economics, Lesson Plan No. 3.

    Science.gov (United States)

    Young, Joan

    Designed as part of a 40-hour course in medical law and economics, this lesson plan was developed to enable students to: (1) define and give examples of the tort of negligence in the medical profession; (2) distinguish between and give examples of personal and professional negligence; (3) be able to identify, for a given situation, the three major…

  3. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  4. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  5. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  6. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  7. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  8. Teaching Norwegian to Beginners: Six Principles to Guide Lesson Planning

    Directory of Open Access Journals (Sweden)

    Anna Krulatz

    2014-01-01

    Full Text Available Teaching a foreign language is no simple task. There are several factors to consider, from curriculum design, to material selection and lesson implementation, to assessment. The challenge, however, is even greater, if you are teaching a less commonly taught language such as Norwegian – a language spoken by fewer than six million native speakers, used almost exclusively in one country, and with a limited number of available pedagogical materials. Under such circumstances, the task of preparing high quality communicative lessons is immense, even for an experienced language instructor. The goal of this article is to present how a successful language lesson can be developed even if one is using a textbook that does not foster communicative competence. As an example, I am using a unit from a Norwegian textbook for beginners: På vei, often used in Norwegian as a second language course for adults in Norway. The lesson focuses on routines and times of the day, and it concludes with the students comparing and contrasting their daily routines with a partner. Prior to this lesson, students have learned to provide basic information about themselves (where they come from, what languages they speak, what they do for work, expressions for greetings and goodbyes, basic verbs relating to daily activities such as ‘snakker’ (to speak, ‘kjører’ (to drive, ‘kjøpper’ (to buy, ‘jobber’ (to work, ‘leser’ (to read, ‘scriver’ (to write, ordinal numerals, meals, some food items, some basic prepositions and locations, words for family members, and subject and object pronouns for all persons. If you were to closely follow the textbook in teaching this unit, you would begin by teaching the students how to tell time, then briefly go over some verbs to express daily routines, listen to and read a text titled ‘Jeg står opp klokka seks,’ a narrative about Monica’s day (Monica is one of the characters in the book, and finally ask the students

  9. THE EFFORT TO IMPROVE TEACHERS’PERFORMANCE OF SMA TMI ROUDLATUL QUR’AN IN COMPOSING LESSON PLAN AND EVALUATION INSTRUMENT OF CHARACTER EDUCATION THROUGH WORKSHOP ACADEMIC YEAR 2015/2016

    Directory of Open Access Journals (Sweden)

    Budi Raharjo

    2015-10-01

    Full Text Available Abstract: Difficulties found in Senior High School (SMA TMI Roudlatul Qur’an, teachers were not able to integrate character value into their lesson plan and to identify which behaviour must be success indicators of character education. Out of 18 Character value existed, the measurement of students’success as the better change of their behaviour, some only covering observation and lack of triangulation consideration to more accountable result. Worskhop potentially becomes one of the ways to up grade teachers’performance in determining the instrument of character value education, at the same time, train them the way composing lesson plan which integrates character education. This school action research was aimed to carry out workshop at SMA TMI Roudlatul Qur’an of Metro Municipal City, to improve teachers’performance in composing evaluation instrumen of value character education, to improve teachers’performance in composing integrated character value education.The research took place at SMA TMI Roudlatul Qur’an, located at Mulyojati, Metro Barat, Metro Municipal City. It was done in odd semester, continually to one month. Started in early Academic Year 2015/2016, July to August.The researcher concluded that teachers of SMA TMI Roudlatul Qur’an improved their performance well in composing evaluation instrument of value character education and integrated value character lesson plan through workshop. Facts: Workshop process was considered fair 11 teachers, good by 16 teachers, and very good by 12 teachers. At cycle II, the performance of composing evaluation instrument of character education showed 11 teachers were less sufficient performance, 16 teachers were good performance, and 12 teachers were very good. And the performance of composing integrated character value at cycle II showed 8 moderate teachers, 19 good teachers, and 12 excellent teachers. Key words: Workshop, Lesson Plan, Character Education Evaluation

  10. Health and Safety Management Plan for the Plutonium Stabilization and Packaging System

    International Nuclear Information System (INIS)

    1996-01-01

    This Health and Safety Management Plan (HSMP) presents safety and health policies and a project health and safety organizational structure designed to minimize potential risks of harm to personnel performing activities associated with Plutonium Stabilization and Packaging System (Pu SPS). The objectives of the Pu SPS are to design, fabricate, install, and startup of a glovebox system for the safe repackaging of plutonium oxides and metals, with a requirement of a 50-year storage period. This HSMP is intended as an initial project health and safety submittal as part of a three phase effort to address health and safety issues related to personnel working the Pu SPS project. Phase 1 includes this HSMP and sets up the basic approach to health and safety on the project and addresses health and safety issues related to the engineering and design effort. Phase 2 will include the Site Specific Construction health and Safety Plan (SSCHSP). Phase 3 will include an additional addendum to this HSMP and address health and safety issues associated with the start up and on-site test phase of the project. This initial submittal of the HSMP is intended to address those activities anticipated to be performed during phase 1 of the project. This HSMP is intended to be a living document which shall be modified as information regarding the individual tasks associated with the project becomes available. These modifications will be in the form of addenda to be submitted prior to the initiation of each phase of the project. For additional work authorized under this project this HSMP will be modified as described in section 1.4

  11. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  12. Safety in times of crises - the importance of industrial emergency plans

    International Nuclear Information System (INIS)

    Rademacher, H.; Schulten, R.

    1989-01-01

    Technical and organizational precautions cannot always avoid everyday risks such as accidents, fire, explosions, and other critical situations which without appropriate countermeasures can easily develop into emergencies. While in recent years considerable efforts have been going into improving the technical safety of industrial plants particularly susceptible to accidents (e.g. the nuclear and chemical industry), organizational safety seems to have been neglected. An analysis of different accidents reveals human fallibility rather than technical failures to be causing damage in many cases. Industrial emergency plans are considered to be contributing to the improvement of organizational safety. (orig.) [de

  13. PENERAPAN LESSON STUDY UNTUK MENINGKATAN KEMAMPUAN MENGAJAR MAHASISWA CALON GURU FISIKA

    Directory of Open Access Journals (Sweden)

    Rif’ati Dina Handayani

    2015-02-01

    ABSTRAK Lesson study merupakan suatu model pengembangan kemampuan mengajar melalui pengkajian pembelajaran secara kolaboratif dan berkelanjutan. Lesson study dilaksanakan dalam tiga tahapan, yaitu plan, do, see yang dilaksanakan secara terstruktur, bersiklus dan berkelanjutan. Dalam penelitian ini subjek dari pelaksanaan lesson study adalah empat orang  mahasiswa calon guru fisika yang sedang melaksanakan PPL di salah satu SMP Negeri di Bondowoso. Hasil penelitian menunjukkan bahwa penerapan lesson study dapat meningkatkan kemampuan mengajar mahasiswa calon guru fisika dari kriteria kurang baik menjadi kriteria sangat baik. Kata kunci: Calon guru fisika, Lesson Study, Kemampuan Mengajar

  14. Outline of Fukushima nuclear accident and future action. Lessons learned from accident and countermeasure plan

    International Nuclear Information System (INIS)

    Fukuda, Toshihiko

    2012-01-01

    Fukushima nuclear accident was caused by loss of all AC power sources (SBO) and loss of ultimate heat sink (LUHS) at Fukushima Daiichi Nuclear Power Plants (NPPs) hit by the Great East Japan Earthquake. This article reviewed outline of Fukushima nuclear accident progression when on year had passed since and referred to lessons learned from accident and countermeasure plan to prevent severe accident in SBO and LUHS events by earthquake and tsunami as future action. This countermeasure would be taken to (1) prevent serious flooding in case a tsunami overwhelms the breakwater, with improving water tightness of rooms for emergency diesel generator, batteries and power centers, (2) enhance emergency power supply and cooling function with mobile electricity generator, high pressure fire pump car and alternate water supply source, (3) mitigate environmental effects caused by core damage with installing containment filtered venting, and (4) enforce emergency preparedness in case of severe accident. Definite countermeasure plan for Kashiwazaki-Kariwa NPPs was enumerated. (T. Tanaka)

  15. The Nordic programme for nuclear safety 1990-1993. Plan for 1993

    International Nuclear Information System (INIS)

    1993-04-01

    In 1993 the fourth Nordic Nuclear Safety Research programme will be concluded with final reports on all of the eighteen projects. Each report will contain the results of the work carried out which has taken four years to complete and, at the same time, give a more general survey of the Northern countries' competence within the fields of emergency readiness in situations of abnormal radiation, radioactive waste and its disposal, radioecology and nuclear reactor safety - accessibility of appropriate information. Some of the reports will be published in the form of reference books or in the form of databases of direct assistance to the authorities. A number of seminars will be held so that the results and professional level of the reports can be discussed. The coordinators' and project leaders' plans for these activities are presented with the the amounts of money that project organizers have asked the Nordic Nuclear Safety Research programme to finance them with. During 1993 the plans for the programme starting in 1994 must be laid, and future researchers, project leaders, involved organizations and sponsors determined. (AB)

  16. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  17. Current Activities on Nuclear Safety Culture in Korea. How to meet the challenges for Safety and Safety Culture?

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Chaewoon [International Policy Department Policy and Standard Division, Korea Institute of Nuclear Safety, 19 Gusung-Dong Yuseong-Ku, 305-338 DAEJEON (Korea, Republic of)

    2008-07-01

    'Statement of Nuclear Safety Policy' declared by the Korean Government elucidates adherence to the principle of 'priority to safety'. The 3. Comprehensive Nuclear Energy Promotion Plan (2007-2011) more specifically addressed the necessity to develop and apply 'safety culture evaluation criteria' and to strengthen safety management of concerned organizations in an autonomous way. Putting these policies as a backdrop, Korean Government has taken diverse safety culture initiatives and has encouraged the relevant organizations to develop safety culture practices of their own accord. Accordingly, KHNP, the operating organization in Korea, developed a 'safety culture performance indicator', which has been used to evaluate safety mind of employees and the evaluation results have been continuously reflected in operational management and training programs. Furthermore, KHNP inserted 'nuclear safety culture subject' into every course of more than two week length, and provided employees with special lectures on safety culture. KINS, the regulatory organization, developed indicators for the safety culture evaluation based on the IAEA Guidelines. Also, KINS has hosted an annual Nuclear Safety Technology Information Meeting to share information between regulatory organizations and industries. Furthermore, KINS provided a nuclear safety culture class to the new employees and they are given a chance to participate in performance of a role-reversal socio-drama. Additionally, KINS developed a safety culture training program, published training materials and conducted a 'Nuclear Safety Culture Basic Course' in October 2007, 4 times of which are planed this year. In conclusion, from Government to relevant organizations, 'nuclear safety culture' concept is embraced as important and has been put into practice on a variety of forms. Specifically, 'education and training' is a starting line and sharing

  18. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  19. Lessons drawn from serious accidents in nuclear power stations

    International Nuclear Information System (INIS)

    Kosciusko-Morizet, F.; Tanguy, P.

    1981-01-01

    Taking a number of serious accidents considered to be particularly representative (Windscale, Enrico Fermi, Lucens, Browns Ferry, Three Mile Island and Saint-Laurent-des-Eaux), the paper analyses the conclusions reached in subsequent enquiries and the lessons drawn from them by the responsible authorities. While design problems sometimes come to light, it is much more generally operational safety - problems related to instructions, the training of operators, the man/machine relationship - which appears to be inadequate. The organization of relations between the different partners - builders, operators and safety bodies - likewise gives rise to some observations. Certain measures should be pursued on a broader scale in order to improve our ability to prevent serious accidents: (i) incidents important from the standpoint of safety must be identified; (ii) these incidents must be brought to the knowledge of all partners concerned, in all interested countries; (iii) the lessons drawn from them must be exchanged and compared; and (iv) the lessons must be made generally available in a directly usable form (i.e. as design modifications, changes in instructions and so on). Particular attention must be given to the problems of countries which are embarking on nuclear programmes and which, with a small number of installations, need direct and permanent access to all the lessons drawn from the operation of a large power station park, and must be able to call upon the assistance of teams from outside in the event of an accident. (author)

  20. PUREX/UO3 Facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1996-09-19

    accompanied by and were an integral part of sweeping ``culture changes,`` the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of ``right to left`` project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks.This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping the limited

  1. Applying failure mode effects and criticality analysis in radiotherapy: Lessons learned and perspectives of enhancement

    International Nuclear Information System (INIS)

    Scorsetti, Marta; Signori, Chiara; Lattuada, Paola; Urso, Gaetano; Bignardi, Mario; Navarria, Pierina; Castiglioni, Simona; Mancosu, Pietro; Trucco, Paolo

    2010-01-01

    Introduction: The radiation oncology process along with its unique therapeutic properties is also potentially dangerous for the patient, and thus it should be delivered under a systematic risk control. To this aim incident reporting and analysis are not sufficient for assuring patient safety and proactive risk assessment should also be implemented. The paper accounts for some methodological solutions, lessons learned and opportunities for improvement, starting from the systematic application of the failure mode effects and criticality analysis (FMECA) technique to the radiotherapy process of an Italian hospital. Materials and methods: The analysis, performed by a working group made of experts of the radiotherapy unit, was organised into the following steps: (1) complete and detailed analysis of the process (integration definition for function modelling); (2) identification of possible failure modes (FM) of the process, representing sources of adverse events for the patient; (3) qualitative risk assessment of FMs, aimed at identifying priorities of intervention; (4) identification and planning of corrective actions. Results: Organisational and procedural corrective measures were implemented; a set of safety indexes for the process was integrated within the traditional quality assurance indicators measured by the unit. A strong commitment of all the professionals involved was observed and the study revealed to be a powerful 'tool' for dissemination of patient safety culture. Conclusion: The feasibility of FMECA in fostering radiotherapy safety was proven; nevertheless, some lessons learned as well as weaknesses of current practices in risk management open to future research for the integration of retrospective methods (e.g. incident reporting or root cause analysis) and risk assessment.

  2. Nuclear safety: what is the price to pay? Press file

    International Nuclear Information System (INIS)

    Lheureux, Yves; Leclerc, Nathalie

    2016-01-01

    After having outlined that the ANCCLI's concern about French contradictions in the field of nuclear safety, this publication proposes an overview of the situation of nuclear safety in France in 2016 from the ANCCLI's point of view: big lessons and (too) small changes after Chernobyl and Fukushima, what has changed since Chernobyl and Fukushima. It outlines why emergency measures are not adapted according to the work of the joint ANCCLI-ACRO scientific committee. The following issues are thus commented: too many remaining questions, age and safety level of a nuclear plant, the specific intervention plans (PPI), sheltering, iodine distribution, population evacuation, evacuation time about nuclear sites, hosting sites in case of evacuation, refugees, safety and security. Recommendations are then given, based on European, Japanese, American, Canadian and Indian experiences. The project of a white paper on the post-accidental situation is presented. Several illustrations are proposed about some of the above issues

  3. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  4. Risk-informed decision making a keystone in advanced safety assessment

    International Nuclear Information System (INIS)

    Reinhart, M.

    2007-01-01

    Probabilistic Safety Assessment (PSA) has provided extremely valuable complementary insight, perspective, comprehension, and balance to deterministic nuclear reactor safety assessment. This integrated approach of risk-informed management and decision making has been called Risk-Informed Decision Making (RIDM). RIDM provides enhanced safety, reliability, operational flexibility, reduced radiological exposure, and improved fiscal economy. Applications of RIDM continuously increase. Current applications are in the areas of design, construction, licensing, operations, and security. Operational phase safety applications include the following: technical specifications improvement, risk-monitors and configuration control, maintenance planning, outage planning and management, in-service inspection, inservice testing, graded quality assurance, reactor oversight and inspection, inspection finding significance determination, operational events assessment, and rulemaking. Interestingly there is a significant spectrum of approaches, methods, programs, controls, data bases, and standards. The quest of many is to assimilate the full compliment of PSA and RIDM information and to achieve a balanced international harmony. The goal is to focus the best of the best, so to speak, for the benefit of all. Accordingly, this presentation will address the principles, benefits, and applications of RIDM. It will also address some of the challenges and areas to improve. Finally it will highlight efforts by the IAEA and others to capture the international thinking, experience, successes, challenges, and lessons in RIDM. (authors)

  5. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  6. Safety evaluation report on Tennessee Valley Authority: Browns Ferry nuclear performance plan

    International Nuclear Information System (INIS)

    1989-10-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory commission staff. The Browns Ferry Nuclear Plant consists of three boiling-water reactors at a site in Limestone County, Alabama. The plan addresses the plant-specific concerns requiring resolution before the startup of Unit 2. The staff will inspect implementation of those TVA programs that address these concerns. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 85 refs

  7. Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN). The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections

  8. The implementation of the IAEA accident response plan in Yugoslav practice

    International Nuclear Information System (INIS)

    Orlic, M.; Pavlovic, R.; Markovic, S.; Pavlovic, S.

    1996-01-01

    One of the important lessons from the Chernobyl accident is the necessity of existence of operational national emergency response plan. Summarizing consequences and experiences after Chernobyl accident, expert groups from IAEA, ICRP and other international scientific organizations, have been extensively worked on reviewing old ones, and preparing new radiation protection and nuclear safety principals and codes. One of the important issue is national emergency response plan for radiological accident. The nuclear accident response plan in Yugoslavia is presented in this paper. It is essentially based on IAEA model national response plan for radiological accident. This model has to be adjusted to the specificity of member states. The optimum society organization for emergency management in the case of accidents in ionizing radiation sources practices is suggested in this paper. Specific characteriztics of Yugoslav state organization relating to accident response are emphasised. (author)

  9. NEA/IAEA Workshop on Leadership and Management for Safety. ONR approach

    International Nuclear Information System (INIS)

    Harvey, Paul

    2012-01-01

    Paul Harvey summarised the progress made by the UK ONR on oversight of LMfS since the previous workshop in 2007. The ONR approach is based on published Safety Assessment Principles (SAPs) on Leadership and Management for Safety. The four principles cover Leadership, Capable Organisation, Decision Making and Learning. Safety culture is embodied within the LMfS SAPs/strategy rather than being treated as a specific topic. The ONR LMfS strategy draws on the lessons from major events (e.g., Texas City, Davis Besse, Columbia) and includes integration of LMfS into existing types of regulatory interventions. Key elements of the strategy include more attention to organisational and cultural factors, increased focus on Board/Director/Executive Team levels in licensees, more focus on how licensees oversee themselves, and improving ONR ability to identify precursors and influencing in combination with regulation. Guidance on Leadership and Management for safety has been produced and is undergoing trial use by ONR inspectors. The guidance is structured around the four LMfS safety assessment principles. It provides help on what to look for during interactions with licensees. ONR staff record significant points (both potential concerns and good practices) in their Intervention Reports under the 'LMfS' heading. This should enable ONR to build up a picture of strengths and weaknesses and plan interventions. Workshops on LMfS have been held for inspectors and managers. These cover organisational and cultural lessons from a range of major events and relate these to ONR LMfS strategy and draft guidance. Other interventions which form part of the strategy include 'deep slice' inspections on specific LMfS topics, and interactions with some licensee Company Boards on lessons from major events and the ONR LMfS strategy. These have been received positively by licensees. It was concluded that ongoing effort is needed to fully implement and embed the ONR LMfS strategy

  10. The elements of a commercial human spaceflight safety reporting system

    Science.gov (United States)

    Christensen, Ian

    2017-10-01

    In its report on the SpaceShipTwo accident the National Transportation Safety Board (NTSB) included in its recommendations that the Federal Aviation Administration (FAA) ;in collaboration with the commercial spaceflight industry, continue work to implement a database of lessons learned from commercial space mishap investigations and encourage commercial space industry members to voluntarily submit lessons learned.; In its official response to the NTSB the FAA supported this recommendation and indicated it has initiated an iterative process to put into place a framework for a cooperative safety data sharing process including the sharing of lessons learned, and trends analysis. Such a framework is an important element of an overall commercial human spaceflight safety system.

  11. "Hamlet" and the Elizabethan Revenge Ethic in Text and Film. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson seeks to sensitize students to the complex nature of revenge as it is portrayed in William Shakespeare's "The Tragedy of Hamlet, Prince of Denmark." In the lesson, students learn how Shakespeare's play interprets Elizabethan attitudes toward revenge, as reflected in the structure of the Elizabethan revenge tragedy, one of the…

  12. Improving food safety in the supply chain: Integrating traceability in production and distribution planning

    DEFF Research Database (Denmark)

    Grunow, Martin; Rong, Aiying; Akkerman, Renzo

    2008-01-01

    on production and distribution planning. Here, we develop a methodology for production and distribution planning in food supply chains which minimizes production and logistics costs and at the same time reduces food safety concerns, limits the size of potential recalls, and satisfies product quality...... with traceability from the viewpoint of information system development and technology development such as radio frequency identification (RFID) and DNA-based techniques. However, traceability and its implications for food safety are thus far not incorporated in the standard operations management literature...

  13. Introduction of the Amendment of IAEA Safety Requirements Reflected Lessons Learned from Fukushima Nuclear Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sang-Kyu; Ahn, Hyung-Joon; Kim, Sun-Hae; Cheong, Jae-Hak [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-10-15

    The following five Safety Requirements publications were amended: Governmental, Legal and Regulatory Framework for Safety (GSR Part 1, 2010), Site Evaluation for Nuclear Installations (NS-R-3, 2003), Safety of Nuclear Power Plants: Design (SSR-2/1, 2012), Safety of Nuclear Power Plants: Commissioning and Operation (SSR-2/2, 2011), and Safety Assessment for Facilities and Activities (GSR Part 4, 2009). Figure 1 shows IAEA Safety Standards Categories Major amendments of five Safety Requirements publications were introduced and analyzed in this study. The five IAEA safety requirements publications which are GSR Part 1 and 4, NS-R-3 and SSR-2/1 and 2, were amended to reflect the lesson learned from the Fukushima accident and other operating experiences. Specially, 36 provisions were modified and the new 29 provision with 1 requirement (No. 67: Emergency response facilities on the site) of the SSR-2/1 were established. Since the Fukushima accident happened, a new word, design extension conditions (DECs) which cover substantially the beyond design basis accidents (BDBA), including severe accident conditions, was created and more elaborated by the world nuclear experts. Design extension conditions could include conditions in events without significant fuel degradation and conditions with core melting. Figure 2 shows the range of the DECs. The amendment of the five IAEA safety requirements publications are focused at the prevention of initiating events, which would lead to the DECs, and mitigation of the consequences of DECs by the enhanced defense in depth principle. The following examples of the IAEA requirements to prevent the initiating events are: margins for withstanding external events; margins for avoiding cliff edge effects; safety assessment for multiple facilities or activities at a single site; safety assessment in cases where resources at a facility are shared; consideration of the potential occurrence of events in combination; establishing levels of hazard

  14. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    Science.gov (United States)

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  16. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  17. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  18. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S ampersand H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures

  19. Maximizing value for planned maintenance and turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Crager, John [Asset Performance Canada, ULC (Canada)

    2011-07-01

    In this presentation, Asset Performance Canada elaborates on turnaround management, and provides insight into managing strategies and risks associated with turnaround processes. Value is created fast as turnarounds progress from the strategy and scope definition phases towards the planning and execution phases. Turnarounds employ best practice solutions through common processes proven effective by data, research, and experience, ensuring consistent value creation, performance tracking, and shared lesson-learning. Adherence to the turnaround work process by carefully selected planning team members with clearly defined responsibilities and expectations, as well as an effective process for scope collection and management, are crucial to turnaround success. Further to this, a formal risk management process, employing automated risk tracking software and a safety management plan for assessing risks and their severity is also invaluable in avoiding any additional costs and schedule delays. Finally, assessment of team readiness and alignment through use of the turnaround readiness index, and rapid management of discovery work, can aid in contingency management.

  20. PNRA Process for Utilizing Experience Feedback for Enhancing Nuclear Safety

    International Nuclear Information System (INIS)

    Shah, Z.H.

    2016-01-01

    One of the elements essential for any organization to become a learning organization is to learn from its own and others experience. The importance of utilizing experience feedback for enhancing operational safety is highlighted in nuclear industry again and again and this has resulted in establishment of several national and international forums. In addition, IAEA action plan on nuclear safety issued after Fukushima accident further highlighted the importance of experience sharing among nuclear community to enhance global nuclear safety regime. PNRA utilizes operating experience feedback gathered through different sources in order to improve its regulatory processes. During the review of licensing submissions, special emphasis is given to utilize the lessons learnt from experience feedback relating to nuclear industry within and outside the country. This emphasis has gradually resulted in various safety improvements in the facilities and processes. Accordingly, PNRA has developed a systematic process of evaluation of international operating experience feedback with the aim to create safety conscious approach. This process includes collecting information from different international forums such as IAEA, regulatory bodies of other countries and useful feedback of past accidents followed by its screening, evaluation and suggesting recommendations both for PNRA and its licensees. As a result of this process, several improvements concerning regulatory inspection plans of PNRA as well as in regulatory decision making and operational practices of licensees have been highlighted. This paper will present PNRA approach for utilizing experience feedback in its regulatory processes for enhancing / improving nuclear safety. (author)

  1. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  2. Useful Measures in the Field of Time and Dimensional Rationalisation of Manual Training Lessons

    Science.gov (United States)

    Fosnaric, Samo; Planinsec, Jurij

    2010-01-01

    Schoolwork, especially lessons in manual skills is often associated with various ergonomics stresses. These stresses are the result not only of school obligations but also of the physical working environment and inadequate lesson planning. Much can be done in this field if certain approaches are taken into consideration at the work planning stage.…

  3. Status of IAEA CRPI31018 “Development of Methodologies for the Assessment of Passive Safety System Performance in Advanced Reactors”

    International Nuclear Information System (INIS)

    Subki, Hadid M.

    2011-01-01

    Purpose of research coordination meeting: • To review progress and milestones on all research activities; • To discuss the preliminary experimental data obtained from the Natural Circulation Loop Facility L2 in Italy constructed for the assessment of different methodologies for the evaluation of the reliability of passive safety system; • To discuss lessons-to be-learned from the Fukushima Daiichi Accident in Japan and its implications to near future R&D needs on thermal-hydraulics and reactor safety; • To develop an outline of integrated annual technical report and future collaboration plan

  4. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  5. Safety lessons from aviation.

    Science.gov (United States)

    Higton, Phil

    2005-07-01

    Thirty years ago the world of Commercial Aviation provided a challenging environment. In my early flying days, aircraft accidents were not unusual, flying was seen as a risky business and those who took part, either as a provider or passenger, appeared grudgingly willing to accept the hazards involved. A reduction in the level of risk was sought in technological advances, greater knowledge of physics and science, and access to higher levels of skill through simulation, practice and experience. While these measures did have an impact, the expected safety dividend was not realized. The most experienced, technically competent individuals with the best equipment featured far too regularly in the accident statistics. We had to look at the human element, the impact of flaws or characteristics of the human condition. We call this area Human Factors. My paper describes the concept of Human Factors, its establishment as a key safety tool in aviation and the impact of this on my working life.

  6. Design Safety Considerations for Water Cooled Small Modular Reactors Incorporating Lessons Learned from the Fukushima Daiichi Accident

    International Nuclear Information System (INIS)

    2016-03-01

    The global future deployment of advanced nuclear reactors for electricity generation depends primarily on the ability of nuclear industries, utilities and regulatory authorities to further enhance their reliability and economic competitiveness while satisfying stringent safety requirements. The IAEA has a project to help coordinate Member States efforts in the development and deployment of small and medium sized or small modular reactor (SMR) technology. This project aims simultaneously to facilitate SMR technology developers and potential SMR uses, particularly States embarking on a nuclear power programme, in identifying key enabling technologies and enhancing capacity building by resolving issues relevant to deployment, including nuclear reactor safety. The objective of this publication is to explore common practices for Member States, which will be an essential resource for future development and deployment of SMR technology. The accident at the Fukushima Daiichi nuclear power plant was caused by an unprecedented combination of natural events: a strong earthquake, beyond the design basis, followed by a series of tsunamis of heights exceeding the design basis tsunami considered in the flood analysis for the site. Consequently, all the operating nuclear power plants and advanced reactors under development, including SMRs, have been incorporating lessons learned from the accident to assure and enhance the performance of the engineered safety features in coping with such external events

  7. Sulfur dioxide control in China: policy evolution during the 10th and 11th Five-year Plans and lessons for the future

    International Nuclear Information System (INIS)

    Schreifels, Jeremy J.; Fu, Yale; Wilson, Elizabeth J.

    2012-01-01

    China's Central government established national goals to reduce sulfur dioxide (SO 2 ) emissions by 10% in both the 10th and 11th Five-year Plan periods, 2001–2005 and 2006–2010, respectively. But the early policies were unsuccessful at reducing emissions—emissions increased 28% during the 10th Five-year Plan. After adapting a number of policies and introducing new instruments during the 11th Five-year Plan, SO 2 emissions declined by 14%. We examine the evolution of these policies, their interplay with technical and institutional factors, and capture lessons from the 11th Five-year Plan to guide future pollution control programs. We find that several factors contributed to achievement of the 11th Five-year Plan SO 2 reduction goal: (1) instrument choice, (2) political accountability, (3) emission verification, (4) political support, (5) streamlined targets, and (6) political and financial incentives. The approach integrated multiple policy instruments—market-based, command-and-control, and administrative instruments specific to the Chinese context. The evolution of SO 2 reduction policies and programs has implications for further SO 2 reductions from power plants and other sources, as well as control of other atmospheric pollutants such as nitrogen oxides (NO X ) and carbon dioxide (CO 2 ) in China. - Highlights: ► This paper assesses China's SO 2 reduction policies between 2000 and 2010. ► Government used a variety of policy instruments to achieve emission targets. ► Experience shows that accountability, incentives, and political support were key. ► The policy lessons can aid future policies for SO 2 , NO x , and CO 2 reductions.

  8. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    Science.gov (United States)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  9. The Investigation of the Effects of Physical Education Lessons Planned in Accordance with Cooperative Learning Approach on Secondary School Students' Problem Solving Skills

    Science.gov (United States)

    Gorucu, Alpaslan

    2016-01-01

    The purpose of the present research was to investigate the effects of physical education lessons planned in accordance with cooperative learning approach on secondary school students' problem solving skills. The research was conducted on 48 students studying at Konya/Selçuklu Sehit Mustafa Çuhadar Secondary School in fall semester of 2015-2016…

  10. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  11. Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead

    International Nuclear Information System (INIS)

    Shimizu, Y.

    2016-01-01

    On 19 September, 2012, the Nuclear Regulation Authority (NRA) was established in light of lessons learned from the Fukushima Daiichi accident of 11 March 2011, to ensure that such accidents never happen again, to restore public trust in regulator both in Japan and abroad and to rebuild and foster a genuine safety culture by placing the highest priority on public safety. The NRA, an independent administrative commission of the Ministry of the Environment, is organized to separate the regulatory functions from the promotional functions of the use of nuclear energy within the government, and to independently implement its duties from the perspectives of neutrality and fairness based on its expertise. Having learned the lessons from the Fukushima Daiichi accident and with reference to IAEA safety standards, since its establishment, the NRA has endeavored to strengthen the regulatory requirements, in particular, for hazards such as tsunamis and earthquakes which may lead to common cause failures, and countermeasures against severe accidents. Under the new regulatory scheme, a back-fitting system was introduced. Emergency preparedness and response measures for nuclear facilities were also enhanced. As of end of March 2016, five reactors received NRA’s permission for changing their reactor installations based on the new regulatory requirements, and two nuclear power reactors have restarted their operations. In January 2016, at the request of Japan, the IAEA sent the IRRS mission team to Japan to assess the regulatory framework for nuclear and radiation safety. Through the self-assessment prior to the mission, the NRA has developed 22 action plans, including a) improvement of regulatory inspection, b) capacity building, and c) strengthening of safety research capability. The mission team has found that Japan’s nuclear regulator has demonstrated independence and transparency since it was set up in 2012. The team also noted that the NRA needs to improve the inspection

  12. A Rooster and a Bean Seed. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Lelyuk, Julia

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a description of the lesson; appropriate age level; economic concepts; content standards and benchmarks; related subject areas; instructional objectives;…

  13. Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange : an RPSCB Peer Exchange

    Science.gov (United States)

    2014-08-01

    This report summarizes the Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange, held in Birmingham, Alabama, sponsored by the Federal Highway Administration (FHWA) Office of Safetys Roadway Safety Professi...

  14. Improving patient safety: lessons from rock climbing.

    Science.gov (United States)

    Robertson, Nic

    2012-02-01

    How to improve patient safety remains an intractable problem, despite large investment and some successes. Academics have argued that the root of the problem is a lack of a comprehensive 'safety culture' in hospitals. Other safety-critical industries such as commercial aviation invest heavily in staff training to develop such a culture, but comparable programmes are almost entirely absent from the health care sector. In rock climbing and many other dangerous activities, the 'buddy system' is used to ensure that safety systems are adhered to despite adverse circumstances. This system involves two or more people using simple checks and clear communication to prevent problems causing harm. Using this system as an example could provide a simple, original and entertaining way of introducing medical students to the idea that human factors are central to ensuring patient safety. Teaching the buddy system may improve understanding and acceptance of other patient safety initiatives, and could also be used by junior doctors as a tool to improve the safety of their practice. © Blackwell Publishing Ltd 2012.

  15. Nuclear Safety Review for 2014

    International Nuclear Information System (INIS)

    2014-07-01

    The Nuclear Safety Review 2014 focuses on the dominant nuclear safety trends, issues and challenges in 2013. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: strengthening safety in nuclear installations; improving radiation, transport and waste safety; enhancing emergency preparedness and response (EPR); improving regulatory infrastructure and effectiveness; and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards, and activities relevant to the Agency’s safety standards. The global nuclear community has made steady and continuous progress in strengthening nuclear safety in 2013, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”) and reported in Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2013/8-GC(57)/INF/5), and the Supplementary Information to that report and Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2014/2). • Significant progress continues to be made in several key areas, such as assessments of safety vulnerabilities of nuclear power plants (NPPs), strengthening of the Agency’s peer review services, improvements in EPR capabilities, strengthening and maintaining capacity building, and protecting people and the environment from ionizing radiation. The progress that has been made in these and other areas has contributed to the enhancement of the global nuclear safety framework. • Significant progress has also been made in reviewing the Agency’s safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on vitally important areas such as design and operation of NPPs, protection of NPPs against severe accidents, and EPR. • The Agency continued to

  16. Improving patient safety in Libya: insights from a British health system perspective.

    Science.gov (United States)

    Elmontsri, Mustafa; Almashrafi, Ahmed; Dubois, Elizabeth; Banarsee, Ricky; Majeed, Azeem

    2018-04-16

    Purpose Patient safety programmes aim to make healthcare safe for both patients and health professionals. The purpose of this paper is to explore the UK's patient safety improvement programmes over the past 15 years and explore what lessons can be learnt to improve Libyan healthcare patient safety. Design/methodology/approach Publications focusing on UK patient safety were searched in academic databases and content analysed. Findings Several initiatives have been undertaken over the past 15 years to improve British healthcare patient safety. Many stakeholders are involved, including regulatory and professional bodies, educational providers and non-governmental organisations. Lessons can be learnt from the British journey. Practical implications Developing a national patient safety strategy for Libya, which reflects context and needs is paramount. Above all, Libyan patient safety programmes should reference internationally approved guidelines, evidence, policy and learning from Britain's unique experience. Originality/value This review examines patient safety improvement strategies adopted in Britain to help developing country managers to progress local strategies based on lessons learnt from Britain's unique experience.

  17. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  18. Food safety assurance systems: Microbiological testing, sampling plans, and microbiological criteria

    NARCIS (Netherlands)

    Zwietering, M.H.; Ross, T.; Gorris, L.G.M.

    2014-01-01

    Microbiological criteria give information about the quality or safety of foods. A key component of a microbiological criterion is the sampling plan. Considering: (1) the generally low level of pathogens that are deemed tolerable in foods, (2) large batch sizes, and (3) potentially substantial

  19. Groundwater well services site safety and health plan

    International Nuclear Information System (INIS)

    Tuttle, B.G.

    1996-08-01

    This Site Specific Health and Safety Plan covers well servicing in support of the Environmental Restoration Contractor Groundwater Project. Well servicing is an important part of environmental restoration activities supporting several pump and treat facilities and assisting in evaluation and servicing of various groundwater wells throughout the Hanford Site. Remediation of contaminated groundwater is a major part of the ERC project. Well services tasks help enhance groundwater extraction/injection as well as maintain groundwater wells for sampling and other hydrologic testing and information gathering

  20. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  1. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water

  2. Connected vehicle pilot deployment program phase 1, safety management plan - Tampa (THEA).

    Science.gov (United States)

    2016-04-01

    This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot : Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the : infrastr...

  3. Medical support to Sri Lanka in the wake of tsunamis: planning considerations and lessons learned.

    Science.gov (United States)

    Lane, David A

    2006-10-01

    When massive tsunamis affected the coast of Sri Lanka and other Indian Ocean littorals, elements of the Third Force Service Support Group and assigned Navy, Air Force, Army, and Coast Guard units from the U.S. Pacific Command were "task organized" to form Combined Support Group-Sri Lanka (CSG-SL), charged to conduct humanitarian assistance/disaster relief (HA/DR) operations. The specific mission was to provide immediate relief to the affected population of Sri Lanka and the Maldives, to minimize loss of life, and to mitigate human suffering. A 30-person health care team deployed to the northern province of Jaffna and provided medical assistance to that chronically underserved and acutely overstressed region. For a 12-day period, the team served as the principal medical staff of an under-resourced government hospital and conducted mobile primary care clinics at nearby welfare camps housing > 7,000 internally displaced persons made homeless by the tsunamis. By every measurable standard, CSG-SL accomplished its assigned HA/DR task in Sri Lanka, including the medical mission. In doing so, the medical team learned many important lessons, including five of particular value to planners of similar relief operations in the future. This article discusses the context in which CSG-SL planned and executed the medical aspects of its HA/DR operations in Sri Lanka, and it describes the most significant medical lessons learned.

  4. Human and organizational factors in nuclear safety

    International Nuclear Information System (INIS)

    Garcia, A.; Barrientos, M.; Gil, B.

    2015-01-01

    Nuclear installations are socio technical systems where human and organizational factors, in both utilities and regulators, have a significant impact on safety. Three Mile Island (TMI) accident, original of several initiatives in the human factors field, nevertheless became a lost opportunity to timely acquire lessons related to the upper tiers of the system. Nowadays, Spanish nuclear installations have integrated in their processes specialists and activities in human and organizational factors, promoted by the licensees After many years of hard work, Spanish installations have achieved a better position to face new challenges, such as those posed by Fukushima. With this experience, only technology-centered action plan would not be acceptable, turning this accident in yet another lost opportunity. (Author)

  5. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    Energy Technology Data Exchange (ETDEWEB)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.

  6. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    International Nuclear Information System (INIS)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included

  7. Lessons learned from the NRU vessel leak repair and return to service projects

    International Nuclear Information System (INIS)

    Heeney, P.; Turcotte, J.

    2011-01-01

    In May 2009 the National Research Universal (NRU) reactor was shut down due to a small leak detected from the reactor vessel into the annulus surrounding the reactor. What ensued was a challenging, yet successful, 15 month long Repair and Return to Service Outage. This Repair and Return to Service Outage presented many first-of-a-kind challenges that provide learning opportunities which have been incorporated into subsequent planned outages. These lessons learned are invaluable tools to be used in the planning and execution of future outages. Following the repair of the NRU vessel, AECL was required to conduct annual inspections of the vessel wall. These inspections require an annual Extended Outage (up to 4 weeks in length). A planned Extended Outage was conducted in May/June 2011 and provided an opportunity to implement some of the lessons learned during the Repair and Return to Service Outage. Lessons learned from that Extended Outage have been incorporated in the subsequent monthly maintenance outages, with lessons learned sessions being held after each outage to ensure that the execution of outages is constantly improving. (author)

  8. Analisis Kepatuhan Supervisor Terhadap Implementasi Program Occupational Health & Safety (Ohs) Planned Inspection Di PT. Ccai

    OpenAIRE

    Sarah, Dewi; Ekawati, Ekawati; Widjasena, Baju

    2015-01-01

    The Government has issued Regulation Legislation No. 50 Year 2012 on Health and Safety Management System (SMK3). CCAI is a company that has implemented SMK3. The application of the CCAI SMK3 supported by K3 program one of them is OHS Planned Inspection. This study aimed to analyze the implementation of Occupational Health & Safety (OHS) program Planned Inspection in CCAI. The subjects of this study amounted to five people as the main informants and 2 as an informant triangulation. The res...

  9. Lessons to be learned from an analysis of ammonium nitrate disasters in the last 100 years

    Energy Technology Data Exchange (ETDEWEB)

    Pittman, William; Han, Zhe; Harding, Brian; Rosas, Camilo; Jiang, Jiaojun; Pineda, Alba; Mannan, M. Sam, E-mail: mannan@tamu.edu

    2014-09-15

    Highlights: • Root causes and contributing factors from ammonium nitrate incidents are categorized into 10 lessons. • The lessons learned from the past 100 years of ammonium nitrate incidents can be used to improve design, operation, and maintenance procedures. • Improving organizational memory to help improve safety performance. • Combating and changing organizational cultures. - Abstract: Process safety, as well as the safe storage and transportation of hazardous or reactive chemicals, has been a topic of increasing interest in the last few decades. The increased interest in improving the safety of operations has been driven largely by a series of recent catastrophes that have occurred in the United States and the rest of the world. A continuous review of past incidents and disasters to look for common causes and lessons is an essential component to any process safety and loss prevention program. While analyzing the causes of an accident cannot prevent that accident from occurring, learning from it can help to prevent future incidents. The objective of this article is to review a selection of major incidents involving ammonium nitrate in the last century to identify common causes and lessons that can be gleaned from these incidents in the hopes of preventing future disasters. Ammonium nitrate has been involved in dozens of major incidents in the last century, so a subset of major incidents were chosen for discussion for the sake of brevity. Twelve incidents are reviewed and ten lessons from these incidents are discussed.

  10. Lessons to be learned from an analysis of ammonium nitrate disasters in the last 100 years

    International Nuclear Information System (INIS)

    Pittman, William; Han, Zhe; Harding, Brian; Rosas, Camilo; Jiang, Jiaojun; Pineda, Alba; Mannan, M. Sam

    2014-01-01

    Highlights: • Root causes and contributing factors from ammonium nitrate incidents are categorized into 10 lessons. • The lessons learned from the past 100 years of ammonium nitrate incidents can be used to improve design, operation, and maintenance procedures. • Improving organizational memory to help improve safety performance. • Combating and changing organizational cultures. - Abstract: Process safety, as well as the safe storage and transportation of hazardous or reactive chemicals, has been a topic of increasing interest in the last few decades. The increased interest in improving the safety of operations has been driven largely by a series of recent catastrophes that have occurred in the United States and the rest of the world. A continuous review of past incidents and disasters to look for common causes and lessons is an essential component to any process safety and loss prevention program. While analyzing the causes of an accident cannot prevent that accident from occurring, learning from it can help to prevent future incidents. The objective of this article is to review a selection of major incidents involving ammonium nitrate in the last century to identify common causes and lessons that can be gleaned from these incidents in the hopes of preventing future disasters. Ammonium nitrate has been involved in dozens of major incidents in the last century, so a subset of major incidents were chosen for discussion for the sake of brevity. Twelve incidents are reviewed and ten lessons from these incidents are discussed

  11. Patient safety in the care of mentally ill people in Switzerland: Action plan 2016

    Science.gov (United States)

    Richard, Aline; Mascherek, Anna C; Schwappach, David L B

    2017-01-01

    Background: Patient safety in mental healthcare has not attracted great attention yet, although the burden and the prevalence of mental diseases are high. The risk of errors with potential for harm of patients, such as aggression against self and others or non-drug treatment errors is particularly high in this vulnerable group. Aim: To develop priority topics and strategies for action to foster patient safety in mental healthcare. Method: The Swiss patient safety foundation together with experts conducted round table discussions and a Delphi questionnaire to define topics along the treatment pathway, and to prioritise these topics. Finally, fields of action were developed. Results: An action plan was developed including the definition and prioritization of 9 topics where errors may occur. A global rating task revealed errors concerning diagnostics and structural errors as most important. This led to the development of 4 fields of action (awareness raising, research, implementation, and education and training) including practice-oriented potential starting points to enhance patient safety. Conclusions: The action plan highlights issues of high concern for patient safety in mental healthcare. It serves as a starting point for the development of strategies for action as well as of concrete activities.

  12. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  13. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  14. Effects of the Original Versus Revised Bloom's Taxonomy on Lesson Planning Skills: A Turkish Study Among Pre-Service Teachers

    Science.gov (United States)

    Bümen, Nilay T.

    2007-07-01

    The original taxonomy of educational objectives, developed by Benjamin S.␣Bloom and his associates in the 1950s, was revised several decades later by a group of educationists and cognitive psychologists, who developed a revised taxonomy (RT). This article describes a Turkish study carried out among a group of pre-service teachers in order to compare the influence of the two systems on lesson planning skills. The results confirmed other studies that have indicated a number of advantages of the revised system over the earlier one.

  15. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  16. Safety in the Air: A Curriculum about Flight and Air Traffic Control Designed for Middle School Students.

    Science.gov (United States)

    Colton, Ted

    This six-lesson unit is designed to familiarize sixth, seventh, and eighth grade students with air traffic safety and the individuals who make air traffic safety possible. Each lesson consists of a statement of the concept fostered, a list of objectives, a brief discussion on the focus of the unit, and instructional strategies for lesson topics…

  17. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    Energy Technology Data Exchange (ETDEWEB)

    DiVincenzo, E.P.

    1994-09-27

    The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

  18. Leadership and Management for Safety. General Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factor, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations (registrants and licensees) and other organizations concerned with facilities and activities that give rise to radiation risks

  19. Plan of Nordic research in nuclear safety 1994-97

    International Nuclear Information System (INIS)

    1993-04-01

    A new four-year Nordic research programme in the field of nuclear safety and radiation protection is to start in 1994 as a followup of several preceding Nordic programmes. It will include seven projects and a joint coordination function. The programme is intended to sustain a common understanding among safety authorities in the Nordic countries with respect to reactor safety and radiation protection. It mainly deals with questions that are actual within the Nordic region, but it may also include problems of concern to its eastern neighbours. Two of the projects deal with reactor safety, and one with radioactive waste. The other four projects are on environmental aspects: two of them deal with radioecology, and two with questions related to emergency preparedness. The programme is managed by the Nordic Committee for Safety Research, NKS, consisting of representatives from regulatory authorities, research bodies, and industry. Basic financing is provided by one consortium member from each of the five Nordic countries, whereby an annual budget of approximately 8 million Danish Kroner will be provided. Additional financing comes from sponsors interested in the programme as well as from those organizations taking part in the project work. Definite project plans are to be elaborated within the more general frames described in the present outline. The flexibility of the programme is enhanced by limiting the duration of individual activities to one or two years. This will make it possible to adjust the programme to actual needs in the Nordic countries. (au)

  20. Fukushima Ministerial Conference Urges Continued Work to Strengthen Nuclear Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: Strengthening nuclear safety is a continuous process that leaves no room for complacency, the Co-Presidents of the Fukushima Ministerial Conference on Nuclear Safety said in a statement today. Koichiro Gemba, Japan's Minister of Foreign Affairs, and Fadillah bin Haji Yusof, Malaysia's Deputy Minister of Science, Technology and Innovation, released the Co-Presidents' Statement at the conclusion of the Conference's Ministerial Plenary, on day one of the three-day event. ''It was stressed that nuclear safety is a prerequisite for the peaceful uses of nuclear energy, that strengthening nuclear safety is a continuous process and that there should be no complacency in safety matters,'' the statement said. The statement recognized progress reported by Japan in the response to the Fukushima Daiichi accident, including the achievement of the present stable status of the nuclear power station and the significant decrease in radioactive releases at the accident site. It stressed the importance of continued transparency in sharing objective information on the progress of decommissioning the plant, remediation and waste management, and encouraged Japan to lead an international effort to obtain data from the damaged reactors. ''The lessons learned from these activities, through their dissemination and related cooperation with the international community, are expected to contribute to enhancing the safety and effectiveness of future decommissioning and remediation activities worldwide,'' it said. The statement emphasized the importance of strengthening the IAEA's central role in international efforts to enhance global nuclear safety, underlining the Agency's Safety Standards and the IAEA Action Plan on Nuclear Safety. It urged IAEA Member States to strengthen efforts to implement the Action Plan fully, including the use of international peer reviews and putting the recommendations of such reviews into practice. It stressed the ''utmost importance of establishing and