WorldWideScience

Sample records for safe-end replacement experience

  1. Maintenance service for major component of PWR plant. Replacement of pressurizer safe end weld

    International Nuclear Information System (INIS)

    Miyoshi, Yoshiyuki; Kobayashi, Yuki; Yamamoto, Kazuhide; Ueda, Takeshi; Suda, Naoki; Shintani, Takashi

    2017-01-01

    In October 2016, MHI completed the replacement of safe end weld of pressurizer (Pz) of Ringhals unit 3, which was the first maintenance work for main component of pressurized water reactor (PWR) plant in Europe. For higher reliability and longer lifetime of PWR plant, MHI has conducted many kinds of maintenance works of main components of PWR plants in Japan against stress corrosion cracking due to aging degradation. Technical process for replacement of Pz safe end weld were established by MHI. MHI has experienced the work for 21 PWR units in Japan. That of Ringhals unit 3 was planned and conducted based on the experiences. In this work, Alloy 600 used for welds of nozzles of Pz was replaced with Alloy 690. Alloy 690 is more corrosive-resistant than Alloy 600. Specially designed equipment and technical process were developed and established by MHI to replace safe end weld of Pz and applied for the Ringhals unit 3 as a first application in Europe. The application had been performed in success and achieved the planned replacement work duration and total radiation dose by using sophisticated machining and welding equipment designed to meet the requirements to be small, lightweight and remote-controlled and operating by well skilled MHI personnel experienced in maintenance activities for major components of PWR plant in Japan. The success shows that the experience, activities and technology developed in Japan for main components of PWR plant shall be applicable to contribute reliable operations of nuclear power plants in Europe and other countries. (author)

  2. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  3. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  4. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  5. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  6. Monetary benefits of preventing childhood lead poisoning with lead-safe window replacement.

    Science.gov (United States)

    Nevin, Rick; Jacobs, David E; Berg, Michael; Cohen, Jonathan

    2008-03-01

    Previous estimates of childhood lead poisoning prevention benefits have quantified the present value of some health benefits, but not the costs of lead paint hazard control or the benefits associated with housing and energy markets. Because older housing with lead paint constitutes the main exposure source today in the US, we quantify health benefits, costs, market value benefits, energy savings, and net economic benefits of lead-safe window replacement (which includes paint stabilization and other measures). The benefit per resident child from improved lifetime earnings alone is $21,195 in pre-1940 housing and $8685 in 1940-59 housing (in 2005 dollars). Annual energy savings are $130-486 per housing unit, with or without young resident children, with an associated increase in housing market value of $5900-14,300 per housing unit, depending on home size and number of windows replaced. Net benefits are $4490-5,629 for each housing unit built before 1940, and $491-1629 for each unit built from 1940-1959, depending on home size and number of windows replaced. Lead-safe window replacement in all pre-1960 US housing would yield net benefits of at least $67 billion, which does not include many other benefits. These other benefits, which are shown in this paper, include avoided Attention Deficit Hyperactivity Disorder, other medical costs of childhood lead exposure, avoided special education, and reduced crime and juvenile delinquency in later life. In addition, such a window replacement effort would reduce peak demand for electricity, carbon emissions from power plants, and associated long-term costs of climate change.

  7. SYBR safeTM efficiently replaces ethidium bromide in Aspergillus fumigatus gene disruption.

    Science.gov (United States)

    Canela, H M S; Takami, L A; Ferreira, M E S

    2017-02-08

    Invasive aspergillosis is a disease responsible for high mortality rates, caused mainly by Aspergillus fumigatus. The available drugs are limited and this disease continues to occur at an unacceptable frequency. Gene disruption is essential in the search for new drug targets. An efficient protocol for A. fumigatus gene disruption was described but it requires ethidium bromide, a genotoxic agent, for DNA staining. Therefore, the present study tested SYBR safe TM , a non-genotoxic DNA stain, in A. fumigatus gene disruption protocol. The chosen gene was cipC, which has already been disrupted successfully in our laboratory. A deletion cassette was constructed in Saccharomyces cerevisiae and used in A. fumigatus transformation. There was no statistical difference between the tested DNA stains. The success rate of S. cerevisiae transformation was 63.3% for ethidium bromide and 70% for SYBR safe TM . For A. fumigatus gene disruption, the success rate for ethidium bromide was 100 and 97% for SYBR safe TM . In conclusion, SYBR safe TM efficiently replaced ethidium bromide, making this dye a safe and efficient alternative for DNA staining in A. fumigatus gene disruption.

  8. Stress distribution at the dissimilar metal weld of safety injection nozzle according to safe-end length and SMW thickness

    International Nuclear Information System (INIS)

    Kim, Tae Jin; Jeong, Woo Chul; Huh, Nam Su

    2015-01-01

    In the present paper, we evaluate the effects of the safe-end length and thickness of the similar metal weld (SMW) of safety injection nozzles on stress distributions at the dissimilar metal weld (DMW). For this evaluation, we carry out detailed 2-D axisymmetric finite element analyses by considering four different values of the safe-end length and four different values of the thickness of SMW. Based on the results obtained, we found that the SMW thickness affects the axial stresses at the center of the DMW for the shorter safe-end length; on the other hand, it does not affect the hoop stresses. In terms of the safe-end length, the values of the axial and hoop stresses at the inner surface of the DMW center increase as the safe-end length increases. In particular, for the cases considered in the present study, the stress distributions at the DMW center can be categorized according to certain values of safe-end length

  9. Monetary benefits of preventing childhood lead poisoning with lead-safe window replacement

    OpenAIRE

    Nevin, Rick; Jacobs, David / E.; Berg, Michael; Cohen, Jonathan

    2007-01-01

    Previous estimates of childhood lead poisoning prevention benefits have quantified the present value of some health benefits, but not the costs of lead paint hazard control or the benefits associated with housing and energy markets. Because older housing with lead paint constitutes the main exposure source today in the U.S., we quantify health benefits, costs, market value benefits, energy savings, and net economic benefits of lead-safe window replacement (which includes paint stabilization ...

  10. Experiences from the Architectural Migration of a Joint Replacement Surgery Information System

    Directory of Open Access Journals (Sweden)

    Samuli Niiranen

    2008-01-01

    Full Text Available The goal of this study is to present the experiences gathered from the migration of an existing and deployed joint replacement surgery information system from a classical 2-tier architecture to a 4-tier architecture. These include discussion on the motivation for the migration and on the technical benefits of the chosen technical migration path and an evaluation of user experiences. The results from the analysis of clinical end-user and administrator experiences show an increase in the perceived performance and maintainability of the system and a high level of acceptance for the new system version.

  11. Estimation of residual stress distribution for pressurizer nozzle of Kori nuclear power plant considering safe end

    Energy Technology Data Exchange (ETDEWEB)

    Song, Tae Kwang; Bae, Hong Yeol; Chun, Yun Bae; Oh, Chang Young; Kim, Yun Jae [Korea University, Seoul (Korea, Republic of); Lee, Kyoung Soo; Park, Chi Yong [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2008-08-15

    In nuclear power plants, ferritic low alloy steel nozzle was connected with austenitic stainless steel piping system through alloy 82/182 butt weld. Accurate estimation of residual stress for weldment is important in the sense that alloy 82/182 is susceptible to stress corrosion cracking. There are many results which predict residual stress distribution for alloy 82/182 weld between nozzle and pipe. However, nozzle and piping system usually connected through safe end which has short length. In this paper, residual stress distribution for pressurizer nozzle of Kori nuclear power plant was predicted using FE analysis, which considered safe end. As a result, existing residual stress profile was redistributed and residual stress of inner surface was decreased specially. It means that safe end should be considered to reduce conservatism when estimating the piping system.

  12. International conference on safe decommissioning for nuclear activities: Assuring the safe termination of practices involving radioactive materials. Contributed papers

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Thousands of operations involving the use of radioactive substances will end during the current century. While there is considerable regulatory experience in the 'front end' of the regulatory system for practices, the experience at the back end is more limited as fewer practices have actually been terminated. When a practice is terminated because the facility has reached the end of its useful life, action has to betaken to ensure the safe shutdown of the facility and allow the removal of regulatory controls. There are many issues involved in the safe termination of practices. These include setting criteria for the release of material and sites from regulatory control; determining the suitability of the various options for decommissioning nuclear facilities, managing the waste and material released from control (recycling, reuse or disposal), and the eventual remediation of the site. Some countries have put in place regulatory infrastructures and have developed programmes to manage the associated decommissioning and remediation activities. Other countries are at the stage of assessing what is involved in terminating such practices. The purpose of this Conference is to foster an information exchange on the safe an orderly termination of practices that involve the use of radioactive substances, including both decommissioning and environmental remediation, and to promote improved coherence internationally on strategies and criteria for the safe termination of practices.

  13. International conference on safe decommissioning for nuclear activities: Assuring the safe termination of practices involving radioactive materials. Contributed papers

    International Nuclear Information System (INIS)

    2002-01-01

    Thousands of operations involving the use of radioactive substances will end during the current century. While there is considerable regulatory experience in the 'front end' of the regulatory system for practices, the experience at the back end is more limited as fewer practices have actually been terminated. When a practice is terminated because the facility has reached the end of its useful life, action has to betaken to ensure the safe shutdown of the facility and allow the removal of regulatory controls. There are many issues involved in the safe termination of practices. These include setting criteria for the release of material and sites from regulatory control; determining the suitability of the various options for decommissioning nuclear facilities, managing the waste and material released from control (recycling, reuse or disposal), and the eventual remediation of the site. Some countries have put in place regulatory infrastructures and have developed programmes to manage the associated decommissioning and remediation activities. Other countries are at the stage of assessing what is involved in terminating such practices. The purpose of this Conference is to foster an information exchange on the safe an orderly termination of practices that involve the use of radioactive substances, including both decommissioning and environmental remediation, and to promote improved coherence internationally on strategies and criteria for the safe termination of practices

  14. Commercial experience with facility deactivation to safe storage

    Energy Technology Data Exchange (ETDEWEB)

    Sype, T.T. [Sandia National Labs., Albuquerque, NM (United States); Fischer, S.R. [Los Alamos National Lab., NM (United States); Lee, J.H. Jr.; Sanchez, L.C.; Ottinger, C.A.; Pirtle, G.J. [Sandia National Labs., Albuquerque, NM (United States)

    1995-09-01

    The Department of Energy (DOE) has shutdown many production reactors; the Department has begun a major effort to also shutdown a wide variety of other nuclear facilities. Because so many facilities are being closed, it is necessary to place many of them into a safe- storage status, i.e., deactivation, before conducting decommissioning- for perhaps as long as 20 years. The challenge is to achieve this safe-storage condition in a cost-effective manner while remaining in compliance with applicable regulations. The DOE Office of Environmental Management, Office of Transition and Management, commissioned a lessons-learned study of commercial experience with safe storage and decommissioning. Although the majority of the commercial experience has been with reactors, many of the lessons learned presented in this document can provide insight into transitioning challenges that Will be faced by the DOE weapons complex.

  15. Commercial experience with facility deactivation to safe storage

    International Nuclear Information System (INIS)

    Sype, T.T.; Fischer, S.R.; Lee, J.H. Jr.; Sanchez, L.C.; Ottinger, C.A.; Pirtle, G.J.

    1995-09-01

    The Department of Energy (DOE) has shutdown many production reactors; the Department has begun a major effort to also shutdown a wide variety of other nuclear facilities. Because so many facilities are being closed, it is necessary to place many of them into a safe- storage status, i.e., deactivation, before conducting decommissioning- for perhaps as long as 20 years. The challenge is to achieve this safe-storage condition in a cost-effective manner while remaining in compliance with applicable regulations. The DOE Office of Environmental Management, Office of Transition and Management, commissioned a lessons-learned study of commercial experience with safe storage and decommissioning. Although the majority of the commercial experience has been with reactors, many of the lessons learned presented in this document can provide insight into transitioning challenges that Will be faced by the DOE weapons complex

  16. The End-To-End Safety Verification Process Implemented to Ensure Safe Operations of the Columbus Research Module

    Science.gov (United States)

    Arndt, J.; Kreimer, J.

    2010-09-01

    The European Space Laboratory COLUMBUS was launched in February 2008 with NASA Space Shuttle Atlantis. Since successful docking and activation this manned laboratory forms part of the International Space Station(ISS). Depending on the objectives of the Mission Increments the on-orbit configuration of the COLUMBUS Module varies with each increment. This paper describes the end-to-end verification which has been implemented to ensure safe operations under the condition of a changing on-orbit configuration. That verification process has to cover not only the configuration changes as foreseen by the Mission Increment planning but also those configuration changes on short notice which become necessary due to near real-time requests initiated by crew or Flight Control, and changes - most challenging since unpredictable - due to on-orbit anomalies. Subject of the safety verification is on one hand the on orbit configuration itself including the hardware and software products, on the other hand the related Ground facilities needed for commanding of and communication to the on-orbit System. But also the operational products, e.g. the procedures prepared for crew and ground control in accordance to increment planning, are subject of the overall safety verification. In order to analyse the on-orbit configuration for potential hazards and to verify the implementation of the related Safety required hazard controls, a hierarchical approach is applied. The key element of the analytical safety integration of the whole COLUMBUS Payload Complement including hardware owned by International Partners is the Integrated Experiment Hazard Assessment(IEHA). The IEHA especially identifies those hazardous scenarios which could potentially arise through physical and operational interaction of experiments. A major challenge is the implementation of a Safety process which owns quite some rigidity in order to provide reliable verification of on-board Safety and which likewise provides enough

  17. Year-end technical stop: train to work safely

    CERN Multimedia

    Rosaria Marraffino

    2016-01-01

    As mentioned in the previous issue of the Bulletin (see here), the accelerators are currently undergoing maintenance as part of the year-end technical stop (YETS). Hundreds of people are working simultaneously on different machines, and many of them need to be trained in order to work safely underground. From a Safety Training point of view, this has resulted in a significant increase in training requests, most of them at the last minute, which are now being handled – but not without difficulties.     In the LHC mock-up, a helium leak is simulated. In this stressful situation, the trainees learn how to put their mask on in less than 40 seconds.   "The most requested course is the Self-Rescue Mask classroom training,” explains Christoph Balle, Safety Training Section Leader. “In this course, people are trained to face the oxygen deficiency hazards that may occur in CERN's underground areas, learning...

  18. A safe procedure for connecting a continuous renal replacement therapy device into an extracorporeal membrane oxygenation circuit.

    Science.gov (United States)

    Suga, Natsumi; Matsumura, Yosuke; Abe, Ryuzo; Hattori, Noriyuki; Nakada, Taka-Aki; Oda, Shigeto

    2017-06-01

    Patients receiving extracorporeal membrane oxygenation (ECMO) often require continuous renal replacement therapy (CRRT). The intra-circuit pressure of adult ECMO usually deviates from the physiological range. We investigated the use of CRRT connected to an ECMO circuit with physiological intra-circuit pressures (0-150 mmHg, defined as the "safety range") using an in vitro experiment involving a water-filled ECMO circuit. The intra-circuit pressure pre-pump, post-pump, and post-oxygenator were measured while varying the height of the pump or ECMO flow. The bypass conduit pressure and distance from the post-oxygenator port were measured to find the "safety point", where the bypass pressure remained within the safety range. Both drainage and return limbs of the CRRT machine were connected to the safety point and the inlet and outlet pressures of the hemofilter were recorded while varying the ECMO and CRRT flow. The pre-pump pressure only remained within the safety range for heights >75 cm (ECMO flow = 4 L/min) or ECMO flow machine safely under physiological pressures in adult patients receiving ECMO.

  19. Esophageal Resection for End-Stage Achalasia.

    Science.gov (United States)

    Aiolfi, Alberto; Asti, Emanuele; Bonitta, Gianluca; Siboni, Stefano; Bonavina, Luigi

    2018-04-01

    Achalasia is a rare disease characterized by impaired lower esophageal sphincter relaxation loss and of peristalsis in the esophageal body. Endoscopic balloon dilation and laparoscopic surgical myotomy have been established as initial treatment modalities. Indications and outcomes of esophagectomy in the management of end-stage achalasia are less defined. A literature search was conducted to identify all reports on esophagectomy for end-stage achalasia between 1987 and 2017. MEDLINE, Embase, and Cochrane databases were consulted matching the terms "achalasia," "end-stage achalasia," "esophagectomy," and "esophageal resection." Seventeen articles met the inclusion criteria and 1422 patients were included in this narrative review. Most of the patients had previous multiple endoscopic and/or surgical treatments. Esophagectomy was performed through a transthoracic (74%) or a transhiatal (26%) approach. A thoracoscopic approach was used in a minority of patients and seemed to be safe and effective. In 95 per cent of patients, the stomach was used as an esophageal substitute. The mean postoperative morbidity rate was 27.1 per cent and the mortality rate 2.1 per cent. Symptom resolution was reported in 75 to 100 per cent of patients over a mean follow-up of 43 months. Only five series including 195 patients assessed the long-term follow-up (>5 years) after reconstruction with gastric or colon conduits, and the results seem similar. Esophagectomy for end-stage achalasia is safe and effective in tertiary referral centers. A thoracoscopic approach is a feasible and safe alternative to thoracotomy and may replace the transhiatal route in the future.

  20. Renal Replacement Therapy in End-Stage Sickle Cell Nephropathy: Presentation of Two Cases and Literature Review

    International Nuclear Information System (INIS)

    Al-Mueilo, Samir H.

    2005-01-01

    Chronic renal failure develops in 4-18% of patients with sickle cell anemia. Hemodialysis and kidney transplant are viable options in the management of end-stage renal disease in patients with sickle cell diseases (SCD). Information on kidney disease among Saudi patients with SCD is non-existing. In this report, the clinical course of two adult males with end-stage sickle cell nephropathy from Eastern Saudi Arabia is described. Literature on renal replacement therapy in sickle cell anemia (SCA) is discussed. (author)

  1. Ultrasonic examination for safe end to nozzle dissimilar metal welds of steam generator

    International Nuclear Information System (INIS)

    Wang Zhuowei; Yu Jingsheng; Wang Jianjun

    2014-01-01

    The safe-end weld of steam generator is narrow seam weld with dissimilar metal, the filling material is nickel alloy 152/182 (material 690). The interior structure is of great anisotropic, and fake signal may occur during the defect detection by ultrasonic wave and the error for defect location may be increased. Stratified inspection by ultrasonic transducers with different angle and focus is a practical method which is verified by the real inspection while the linear indication in the inside surface besides the interior flaws are detected. (authors)

  2. Hydration characteristics of zirconium oxide replaced Portland cement for use as a root-end filling material.

    Science.gov (United States)

    Camilleri, J; Cutajar, A; Mallia, B

    2011-08-01

    Zirconium oxide can be added to dental materials rendering them sufficiently radiopaque. It can thus be used to replace the bismuth oxide in mineral trioxide aggregate (MTA). Replacement of Portland cement with 30% zirconium oxide mixed at a water/cement ratio of 0.3 resulted in a material with adequate physical properties. This study aimed at investigating the microstructure, pH and leaching in physiological solution of Portland cement replaced zirconium oxide at either water-powder or water-cement ratios of 0.3 for use as a root-end filling material. The hydration characteristics of the materials which exhibited optimal behavior were evaluated. Portland cement replaced by zirconium oxide in varying amounts ranging from 0 to 50% in increments of 10 was prepared and divided into two sets. One set was prepared at a constant water/cement ratio while the other set at a constant water/powder ratio of 0.3. Portland cement and MTA were used as controls. The materials were analyzed under the scanning electron microscope (SEM) and the hydration products were determined. X-ray energy dispersive analysis (EDX) was used to analyze the elemental composition of the hydration products. The pH and the amount of leachate in Hank's balanced salt solution (HBSS) were evaluated. A material that had optimal properties that satisfied set criteria and could replace MTA was selected. The microstructure of the prototype material and Portland cement used as a control was assessed after 30 days using SEM and atomic ratio diagrams of Al/Ca versus Si/Ca and S/Ca versus Al/Ca were plotted. The hydration products of Portland cement replaced with 30% zirconium oxide mixed at water/cement ratio of 0.3 were calcium silicate hydrate, calcium hydroxide and minimal amounts of ettringite and monosulphate. The calcium hydroxide leached in HBSS solution resulted in an increase in the pH value. The zirconium oxide acted as inert filler and exhibited no reaction with the hydration by-products of Portland

  3. Disparities in abortion experience and access to safe abortion ...

    African Journals Online (AJOL)

    In Ghana, abortion mortality constitutes 11% of maternal mortality. Empirical studies on possible disparities in abortion experience and access to safe abortion services are however lacking. Based on a retrospective survey of 1,370 women aged 15-49 years in two districts in Ghana, this paper examines disparities in ...

  4. Lessons learned from commercial experience with nuclear plant decontamination to safe storage

    International Nuclear Information System (INIS)

    Fischer, S.R.; Partain, W.L.; Sype, T.

    1995-01-01

    The Department of Energy (DOE) has successfully performed decontamination and decommissioning (D ampersand D) on many production reactors it. DOE now has the challenge of performing D ampersand D on a wide variety of other nuclear facilities. Because so many facilities are being closed, it is necessary to place many of them into a safe-storage status before conducting D ampersand D-for perhaps as much as 20 yr. The challenge is to achieve this safe-storage condition in a cost-effective manner while remaining in compliance with applicable regulations. The DOE Office of Environmental Management, Office of Transition and Management, commissioned a lessons learned study of commercial experience with safe storage and transition to D ampersand D. Although the majority of the commercial experience has been with reactors, many of the lessons learned presented in this paper are directly applicable to transitioning the DOE Weapons Complex

  5. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  6. 30 years of experience in safe transportation of nuclear materials

    International Nuclear Information System (INIS)

    Kaneko, K.

    2004-01-01

    In April 2003, Nuclear Fuel Transport Co., Ltd. (NFT) marked the 30 th anniversary of its founding. NFT was established in 1973 and in 1978, commenced SF transport to the reprocessing plant in Tokai-mura. And then, after making preparations to transport nuclear materials to the various facilities at the Nuclear Fuel Cycle Center in Rokkasho-mura, NFT successfully started transportation of LLW (low level waste) to Rokksho-mura's LLW disposal center in 1992, domestic land transportation of HLW returned from overseas to the HLW storage center in 1995, domestic land transportation of natural hexafluoride delivered from overseas to the uranium enrichment plant in 1996, and transportation of SF to the reprocessing plant in 2000. NFT has realized an annual SF transportation capacity of 300 MTU and is currently making great company wide efforts to meet the Rokkasho Reprocessing Plant's future SF annual reprocessing capacity of 800MTU. At the end of FY2003, NFT had successfully transported 560 casks (about 1,730 MTU) of SF in more than 200 voyages in total, about 160,000 drums of LLW in around 100 voyages in total. This paper introduces the record of safe transport and its experience over the past 30 years and prospect for future transport business

  7. 30 years of experience in safe transportation of nuclear materials

    Energy Technology Data Exchange (ETDEWEB)

    Kaneko, K. [Nuclear Fuel Transport Co., Ltd., Tokyo (Japan)

    2004-07-01

    In April 2003, Nuclear Fuel Transport Co., Ltd. (NFT) marked the 30{sup th} anniversary of its founding. NFT was established in 1973 and in 1978, commenced SF transport to the reprocessing plant in Tokai-mura. And then, after making preparations to transport nuclear materials to the various facilities at the Nuclear Fuel Cycle Center in Rokkasho-mura, NFT successfully started transportation of LLW (low level waste) to Rokksho-mura's LLW disposal center in 1992, domestic land transportation of HLW returned from overseas to the HLW storage center in 1995, domestic land transportation of natural hexafluoride delivered from overseas to the uranium enrichment plant in 1996, and transportation of SF to the reprocessing plant in 2000. NFT has realized an annual SF transportation capacity of 300 MTU and is currently making great company wide efforts to meet the Rokkasho Reprocessing Plant's future SF annual reprocessing capacity of 800MTU. At the end of FY2003, NFT had successfully transported 560 casks (about 1,730 MTU) of SF in more than 200 voyages in total, about 160,000 drums of LLW in around 100 voyages in total. This paper introduces the record of safe transport and its experience over the past 30 years and prospect for future transport business.

  8. Replacement of the JRR-3 computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-10-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  9. Replacement of the JRR-3 computer system

    International Nuclear Information System (INIS)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu

    2000-01-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  10. End-to-End Beam Simulations for the New Muon G-2 Experiment at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Korostelev, Maxim [Cockcroft Inst. Accel. Sci. Tech.; Bailey, Ian [Lancaster U.; Herrod, Alexander [Liverpool U.; Morgan, James [Fermilab; Morse, William [RIKEN BNL; Stratakis, Diktys [RIKEN BNL; Tishchenko, Vladimir [RIKEN BNL; Wolski, Andrzej [Cockcroft Inst. Accel. Sci. Tech.

    2016-06-01

    The aim of the new muon g-2 experiment at Fermilab is to measure the anomalous magnetic moment of the muon with an unprecedented uncertainty of 140 ppb. A beam of positive muons required for the experiment is created by pion decay. Detailed studies of the beam dynamics and spin polarization of the muons are important to predict systematic uncertainties in the experiment. In this paper, we present the results of beam simulations and spin tracking from the pion production target to the muon storage ring. The end-to-end beam simulations are developed in Bmad and include the processes of particle decay, collimation (with accurate representation of all apertures) and spin tracking.

  11. Poignancy: Mixed Emotional Experience in the Face of Meaningful Endings

    Science.gov (United States)

    Ersner-Hershfield, Hal; Mikels, Joseph A.; Sullivan, Sarah J.; Carstensen, Laura L.

    2009-01-01

    The experience of mixed emotions increases with age. Socioemotional selectivity theory suggests that mixed emotions are associated with shifting time horizons. Theoretically, perceived constraints on future time increase appreciation for life, which, in turn, elicits positive emotions such as happiness. Yet, the very same temporal constraints heighten awareness that these positive experiences come to an end, thus yielding mixed emotional states. In 2 studies, the authors examined the link between the awareness of anticipated endings and mixed emotional experience. In Study 1, participants repeatedly imagined being in a meaningful location. Participants in the experimental condition imagined being in the meaningful location for the final time. Only participants who imagined “last times” at meaningful locations experienced more mixed emotions. In Study 2, college seniors reported their emotions on graduation day. Mixed emotions were higher when participants were reminded of the ending that they were experiencing. Findings suggest that poignancy is an emotional experience associated with meaningful endings. PMID:18179325

  12. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel's capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007. Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE's long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the

  13. Experience from replacement and check of thermocouples during reconstruction of in-reactor temperature measurements at Bohunice V-1 units 1 and 2

    International Nuclear Information System (INIS)

    Slanina, M.; Stanc, J.

    2001-01-01

    Replacement of thermocouples in the protection tube blocks was a key phase of the reconstruction of in-reactor temperature measurements at Bohunice V-1 with regard to the success, reliability and impact on safety of unit operation. The replacement consisted of reliable and safe withdrawal of 216 old thermocouples, their disposal and installation of new thermocouples into dry channels. In the material presented, this phase of reconstruction is described in details, with focus on the evaluation of replacement quality and check activities carried out at the new installed thermocouples. (Authors)

  14. Replacing PS controls front end minicomputers by VME based 32-bit processors

    International Nuclear Information System (INIS)

    Gagnaire, A.; Metz Noblat, N. de; Serre, Ch.; Sicard, Cl.H.

    1992-01-01

    The PS controls have started the first phase of system rejuvenation, targeted towards the LEP Preinjector Controls. The main impact of this phase is in the architectural change, as both the front-end minicomputers and the CAMAC embedded microprocessors are replaced by microprocessor based VME crates called Device Stub Controllers (DSC). This paper discusses the different steps planned for this first phase, i.e: (1) implementing the basic set of CERN Accelerator common facilities for DSCs (error handling, system surveillance, remote boot and network access); (2) porting the equipment access software layer; (3) applying the Real-time tasks to the LynxOS operating system and I/O architecture, conforming to the real-time constraints for control and acquisition; (4) defining the number and contents of the different DSC needed, according to geographical and cpu-load constraints; (5) providing the general services outside the DSC crates (file servers, data-base services); (6) emulating the current Console programs onto the new workstations. (author)

  15. Effect of replacing maize with pride of barbados ( Delonix regia ...

    African Journals Online (AJOL)

    The five dietary treatments contained 0, 25, 50, 75 and 100% replacement levels of Delonix regia seed meal (DRSM) for maize in a completely randomized design experiment. The parameters investigated during the study were: feed intake, weight gain, feed conversion ratio and feed cost. At the end of the feeding trial, ...

  16. Nuclear power failure signals end of an era

    International Nuclear Information System (INIS)

    Mariotte, M.

    1996-01-01

    In the United States, open-quotes the nuclear industry is dead, kaput, finishedclose quotes says Michael Mariotte, executive director of the Nuclear Information and Resource Service in Washington, D.C. Why? Investors are reluctant to gamble their money on a future generation of supposedly safe, economic nuclear power plants. open-quotes in 1979, the 'safe' Three Mile Island-2 reactor turned a several-hundred-million-dollar investment into a billion-dollar loss in a matter of hours,close quotes Mariotte says. open-quotes In fact, investing in nuclear power at this point would be like investing in the Titanic II.close quotes However, diehard proponents of nuclear energy persist in their optimism for a new nuclear age, Mariotte says. These nuclear backers see the need to replace aging plants with a new generation of safer plants. But would a new generation of reactors really be safer? open-quotes To date, the industry may spur some new nuclear plants, it is more likely to lead to alternative renewable sources of energy that are more economical. open-quotes The nuclear age has ended as a result of inefficiency and unacceptable risks...After 50 years of sustained abuse, the Earth has finally and deservedly entered the end of the nuclear age,close quotes Mariotte says

  17. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  18. Use of seismic experience data for technical evaluation of commercial grade replacement items

    International Nuclear Information System (INIS)

    Cushing, R.W.; Campbell, R.D.

    1991-01-01

    This paper reports that the purchase of commercial grade replacement items which are dedicated for use in nuclear safety related systems requires a technical evaluation for those items which cannot be purchased as like-for-like replacements. One of the requirements for performing a technical evaluation is verification of seismic adequacy. Studying the performance and failure modes of equipment which has been subjected to strong motion earthquakes has provided the industry with the ability to predict the behavior characteristics of many types of commonly replaced components and parts. The use of Seismic Experience Data has developed into an efficient means of satisfying the seismic adequacy requirement

  19. Renal replacement therapy in Latin American end-stage renal disease.

    Science.gov (United States)

    Rosa-Diez, Guillermo; Gonzalez-Bedat, Maria; Pecoits-Filho, Roberto; Marinovich, Sergio; Fernandez, Sdenka; Lugon, Jocemir; Poblete-Badal, Hugo; Elgueta-Miranda, Susana; Gomez, Rafael; Cerdas-Calderon, Manuel; Almaguer-Lopez, Miguel; Freire, Nelly; Leiva-Merino, Ricardo; Rodriguez, Gaspar; Luna-Guerra, Jorge; Bochicchio, Tomasso; Garcia-Garcia, Guillermo; Cano, Nuria; Iron, Norman; Cuero, Cesar; Cuevas, Dario; Tapia, Carlos; Cangiano, Jose; Rodriguez, Sandra; Gonzalez, Haydee; Duro-Garcia, Valter

    2014-08-01

    The Latin American Dialysis and Renal Transplant Registry (RLADTR) was founded in 1991; it collects data from 20 countries which are members of Sociedad Latinoamericana de Nefrología e Hipertension. This paper presents the results corresponding to the year 2010. This study is an annual survey requesting data on incident and prevalent patients undergoing renal replacement treatment (RRT) in all modalities: hemodialysis (HD), peritoneal dialysis (PD) and living with a functioning graft (LFG), etc. Prevalence and incidence were compared with previous years. The type of renal replacement therapy was analyzed, with special emphasis on PD and transplant (Tx). These variables were correlated with the gross national income (GNI) and the life expectancy at birth. Twenty countries participed in the surveys, covering 99% of the Latin American. The prevalence of end stage renal disease (ESRD) under RRT in Latin America (LA) increased from 119 patients per million population (pmp) in 1991 to 660 pmp in 2010 (HD 413 pmp, PD 135 pmp and LFG 111 pmp). HD proportionally increased more than PD, and Tx HD continues to be the treatment of choice in the region (75%). The kidney Tx rate increased from 3.7 pmp in 1987 to 6.9 pmp in 1991 and to 19.1 in 2010. The total number of Tx's in 2010 was 10 397, with 58% deceased donors. The total RRT prevalence correlated positively with GNI ( r 2 0.86; P chronic kidney disease (CKD) and its associated risk factors. PD is still an underutilized strategy for RRT in the region. Even though renal Tx is feasible, its growth rate is still not as fast as it should be in order to compensate for the increased prevalence of patients on waiting lists. Diagnostic and prevention programs for hypertension and diabetes, appropriate policies promoting the expansion of PD and organ procurement as well as transplantation as cost-effective forms of RRT are needed in the region. Regional cooperation among Latin American countries, allowing the more developed to

  20. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  1. Replacing textbook problems with lab experiences

    Science.gov (United States)

    Register, Trevor

    2017-10-01

    End-of-the-chapter textbook problems are often the bread and butter of any traditional physics classroom. However, research strongly suggests that students be given the opportunity to apply their knowledge in multiple contexts as well as be provided with opportunities to do the process of science through laboratory experiences. Little correlation has been shown linking the number of textbook problems solved with conceptual understanding of topics in mechanics. Furthermore, textbook problems as the primary source of practice for students robs them of the joy and productive struggle of learning how to think like an experimental physicist. Methods such as Modeling Instruction tackle this problem head-on by starting each instructional unit with an inquiry-based lab aimed at establishing the important concepts and equations for the unit, and this article will discuss ideas and experiences for how to carry that philosophy throughout a unit.

  2. replacement of the heart of the CMS experiment - the pixel #detector.

    CERN Multimedia

    AUTHOR|(CDS)2070299

    2017-01-01

    This week, one of the Large Hadron Collider’s experiments gets a “heart transplant”. --- Physicists and engineers are replacing the heart of the CMS experiment - the pixel #detector. This will improve CMS’s ability to make precise measurements on aspects of the Standard Model, including the properties of the #HiggsBoson. The #LHC and its experiments are currently preparing to wake up this spring, when the accelerator will begin to collide particles once more at close to the speed of light. --- Today at 12:15 CET, join us live on #Facebook and ask us anything: https://www.facebook.com/cern/

  3. Gender dysphoria and the controversy over the Safe Schools program.

    Science.gov (United States)

    Parkinson, Patrick

    2017-10-01

    The Safe Schools program has attracted great controversy. On one end of the spectrum, it is defended as an anti-bullying program for young people who identify themselves as gay or lesbian, or have issues concerning their gender identity. On the other end of the spectrum, it is regarded as social engineering. This article seeks to promote a discussion of the way in which gender identity issues are addressed in the Safe Schools program. It is argued that the information in this program to Principals, teachers and young people is inaccurate and misleading. The program, as presently designed, may actually cause harm to children and young people who experience gender identity issues because it promotes gender transitioning without expert medical advice. The Safe Schools materials do not acknowledge that the great majority of children resolve gender dysphoria issues around the time of puberty. It may be much more difficult for a child to accept his or her gender at puberty if he or she has already changed name and gender identity in primary school. These deficits need to be addressed if the program is to continue.

  4. Eight year experience in open ended instrumentation laboratory

    Science.gov (United States)

    Marques, Manuel B.; Rosa, Carla C.; Marques, Paulo V. S.

    2015-10-01

    When designing laboratory courses in a Physics Major we consider a range of objectives: teaching Physics; developing lab competencies; instrument control and data acquisition; learning about measurement errors and error propagation; an introduction to project management; team work skills and scientific writing. But nowadays we face pressure to decrease laboratory hours due to the cost involved. Many universities are replacing lab classes for simulation activities, hiring PhD. and master students to give first year lab classes, and reducing lab hours. This leads to formatted lab scripts and poor autonomy of the students, and failure to enhance creativity and autonomy. In this paper we present our eight year experience with a laboratory course that is mandatory in the third year of Physics and Physical Engineering degrees. Since the students had previously two standard laboratory courses, we focused on teaching instrumentation and giving students autonomy. The course is divided in two parts: one third is dedicated to learn computer controlled instrumentation and data acquisition (based in LabView); the final 2/3 is dedicated to a group project. In this project, the team (2 or 3 students) must develop a project and present it in a typical conference format at the end of the semester. The project assignments are usually not very detailed (about two or three lines long), giving only general guidelines pointing to a successful project (students often recycle objectives putting forward a very personal project); all of them require assembling some hardware. Due to our background, about one third of the projects are related to Optics.

  5. 9 CFR 82.15 - Replacement birds and poultry.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Replacement birds and poultry. 82.15... AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.15 Replacement birds and poultry. Birds...

  6. The Replacement of Safe Assets: Evidence from the U.S. Bond Portfolio

    OpenAIRE

    Bertaut, Carol C.; Tabova, Alexandra M.; Wong, Vivian

    2014-01-01

    The expansion in financial sector "safe" assets, largely in the form of structured products from the U.S. and the Caribbean, in the lead-up to the global financial crisis has by now been fairly well documented. Using a unique dataset derived from security-level data on U.S. portfolio holdings of foreign securities, we show that since the crisis, it is mostly the foreign financial sector that appears to have met U.S. demand for safe and liquid investment assets by expanding its supply of debt ...

  7. Safe Software for Space Applications: Building on the DO-178 Experience

    Science.gov (United States)

    Dorsey, Cheryl A.; Dorsey, Timothy A.

    2013-09-01

    DO-178, Software Considerations in Airborne Systems and Equipment Certification, is the well-known international standard dealing with the assurance of software used in airborne systems [1,2]. Insights into the DO-178 experiences, strengths and weaknesses can benefit the international space community. As DO-178 is an excellent standard for safe software development when used appropriately, this paper provides lessons learned and suggestions for using it effectively.

  8. Arteriovenous renal replacement therapy in end-stage left-sided heart failure patients has a detrimental effect on patients with impaired right ventricular function.

    Science.gov (United States)

    Repasos, Evangelos; Kaldara, Elisabeth; Pantsios, Christos; Kapelios, Chris; Nana, Emmeleia; Vernadakis, Spiridon; Melexopoulou, Christina; Malliaras, Konstantinos; Boletis, John; Nanas, John N

    Chronic intermittent renal replacement therapy(RRT) is an alternate method of decongestion for patients presenting with diuretic-resistant, end-stage heart failure(HF) and cardiorenal syndrome. The optimal method of vascular access has not been confirmed. This study investigated the 6-month outcomes of patients with end-stage HF after the creation of arteriovenous communications (AVC) compared with other means of RRT. We treated 40 patients with chronic, intermittent, ambulatory RRT, of whom 15 (37.5%; Group A) underwent creation of AVC, and 25 (62.5%; Group B) received intraperitoneal (n=6) or internal jugular catheters (n=19) with the goal of achieving body weight stabilization and relief from congestion. The characteristics of the two groups were similar. According to Cox regression analysis, the 6-month rate of death or re-hospitalization for HF was significantly higher in Group A (73%) than in Group B (44%); hazard ratio (HR): 2.58; 95% confidence interval (CI) 1.2-6.2; P=0.02. Over a 6-month follow-up, the cumulative survival was significantly shorter (P=0.03) in Group A (13.8±10 weeks) than in Group B (20.7±7 weeks). In the 15 patients who received AVC, the only independent predictor of adverse outcome at 6 months was serum total bilirubin concentration (HR 2.5; 95% CI 1.1-5.7, p=0.02), whereas in the 25 patients who underwent other means of RRT, pulmonary vascular resistance (PVR) was identified as a risk factor for hospitalization or death at 1-year follow-up (HR 1.26; 95% CI 1.1-1.57, p=0.04). In patients with end-stage HF, the creation of AVC for intermittent RRT was followed by a significant increase in morbidity and mortality in comparison to the safe and effective placement of permanent central venous catheters. Patients with elevated PVR seem to comprise a group at high risk for adverse outcomes after central catheter insertion. Copyright © 2016 Hellenic Society of Cardiology. Published by Elsevier B.V. All rights reserved.

  9. TOTAL JOINT REPLACEMENT OF THE LOWER EXTREMITY IN PATIENTS WITH JUVENILE IDIOPATHIC ARTHRITIS

    Directory of Open Access Journals (Sweden)

    Стюарт Б. Гудмэн

    2014-03-01

    Full Text Available Joint replacement of the lower extremity in Juvenile Idiopathic Arthritis (JIA is becoming more commonly performed worldwide. These young adults experience severe pain and disability from end-stage arthritis, and require joint replacement of the hip or knee to alleviate pain, and restore ambulation and function. These procedures are very challenging from the anesthesia and surgical point of view, due to small overall proportions, numerous bony and other deformities and soft tissue contractures. Joint replacement operations for JIA are best performed by experienced teams, where pre-operative and peri-operative care, and post-operative rehabilitation can be optimized in a collaborative, patient-centered environment.

  10. Your Turn to Run Your Country Just Ended: Global-Reach Regime Replacement

    National Research Council Canada - National Science Library

    Scott, Paul J

    2007-01-01

    Global-Reach Regime Replacement, alternately referred to as GR3, is a proposed method to forcibly remove an existing regime from power, replace it with a new government, and conduct appropriate levels...

  11. Light water ultra-safe plant concept: First annual report

    International Nuclear Information System (INIS)

    Klevans, E.

    1987-01-01

    Since the accident at Three Mile Island (TMI) Penn State Nuclear Engineering Department Faculty and Staff have considered various methods to improve already safe reactor designs and public perception of the safety of Nuclear Power. During the last year, the Department of Energy funded the study of a plant reconfiguration originally proposed by M.A. Shultz. This report presents the status of the project at the end of the first year. A broad set of specifications to improve safety and public perception were set forth and the realization of these goals is achieved in a plant design named, ''The Light Water Ultra-Safe Plant Concept.'' The most significant goals of the concept address the station black-out problem and simplification of required operator actions during abnormal situations. These goals are achieved in the Ultra-Safe Concept by addition of an in-containment atmospheric tank containing a large quantity of cool water, replacement of the conventional PWR pressurizer system with a pressurizing pump, internal emergency power generation, and arrangement of components to utilize natural circulation at shut-down. The first year effort included an evaluation of the normal operation characteristics of the primary system pressurizing concept, evaluating parameters and modeling for analysis of the shutdown scenario, design of a low power density core, design of a low-pressure waste handling system, arrangement of a drainage system for pipe break considerations, and failure modes and effects analysis

  12. Use of seismic experience data for replacement and new equipment

    International Nuclear Information System (INIS)

    Johnson, H.W.; Hardy, G.S.; Horstman, N.G.; Baughman, P.D.

    1990-01-01

    Over the past seven years the use of seismic experience data to address seismic concerns has received a great deal of attention, particularly regarding the NRC Unresolved Safety Issue (USI) A-46. The Seismic Qualification Utility Group (SQUG) was formed in January 1982 to develop a practical alternative to the rigorous seismic qualification of equipment for resolution of USI A-46. The alternative method chosen is seismic experience technology. The purpose of this paper is to explore two additional potential applications of seismic experience technology: Replacement parts and New equipment/design change process. The need for, and benefits of, these applications are summarized. The available technology and the methodologies proposed are described. The methodology descriptions include a summary of the requirements for the seismic evaluations, an outline of the method, and the documentation requirements. (orig./HP)

  13. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  14. Pain relief at the end of life: nurses' experiences regarding end-of-life pain relief in patients with dementia.

    Science.gov (United States)

    Brorson, Hanna; Plymoth, Henrietta; Örmon, Karin; Bolmsjö, Ingrid

    2014-03-01

    Patients with dementia receive suboptimal palliative care, and this patient group is at risk to have pain at the end of life. Because communicative impairments are common in this patient group, nurses play an important caregiver role in identifying, assessing, and relieving patients' pain. This study aimed to describe nurses' experiences regarding end-of-life pain relief in patients with dementia. This descriptive exploratory qualitative study was based on seven semistructured interviews. Burnard's content analysis inspired the data analysis. Two main categories were identified: (1) nurses' experience of difficulties concerning pain relief and (2) nurses' experience of resources concerning pain relief. Nurses experienced difficulties, such as feeling of powerlessness because of difficulties in obtaining adequate prescriptions for analgesics, ethical dilemmas, feeling of inadequacy because analgesia did not have the desired effect, and a feeling of not being able to connect with the patient. Factors, including knowledge about the patient, professional experience, utilization of pain assessment tools, interpersonal relationships, and interprofessional cooperation, served as resources and enabled end-of-life pain relief. The results of this study highlight the complexity of pain relief in patients with dementia at the end of life from a nursing perspective. The inability of patients with dementia to verbally communicate their pain makes them a vulnerable patient group, dependent on their caregivers. Knowing the life story of the patient, professional experience, teamwork based on good communication, and use of a pain assessment tool were reported by the nurses to improve pain relief at the end of life for patients with dementia. Copyright © 2014 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  15. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  16. Replacement rod

    International Nuclear Information System (INIS)

    Hatfield, S.C.

    1989-01-01

    This patent describes in an elongated replacement rod for use with fuel assemblies of the type having two end fittings connected by guide tubes with a plurality of rod and guide tube cell defining spacer grids containing rod support features and mixing vanes. The grids secured to the guide tubes in register between the end fittings at spaced intervals. The fuel rod comprising: an asymmetrically beveled tip; a shank portion having a straight centerline; and a permanently diverging portion between the tip and the shank portion

  17. Fluorescent Lamp Replacement Study

    Science.gov (United States)

    2017-07-01

    not be cited for purposes of advertisement. DISPOSITION INSTRUCTIONS: Destroy this document when no longer needed. Do not return to the... recycling , and can be disposed safely in a landfill. (2) LEDs offer reduced maintenance costs and fewer bulb replacements, significantly reducing... recycling . Several fixtures, ballasts and energy efficient fluorescent bulbs that were determined to be in pristine condition were returned to ATC

  18. A new challenges in international cooperation. Via interdisciplinary approach towards safe nuclear industry back-end

    International Nuclear Information System (INIS)

    Dreimanis, Andrejs

    2011-01-01

    Development of multinational radioactive waste and spent nuclear fuel repositories requires safe nuclear industry back-end. We propose an interdisciplinary synergetic approach to multilevel consensus building for siting shared multinational repositories, based on self-organization, chaos and fuzziness concepts. An entire partnering country is considered as a higher-level stakeholder - the national stakeholder, being faced to simultaneous seeking an upward (international) and a downward (intra-national) consensus in the environment, being characterized by diverse political, economic and social interests. There is deduced: a) building of international stakeholder consensus could be promoted by activating the international scale multilateral interactions between intra- and international stakeholders, b) gradual progress in intergovernmental consensus and reaching multilateral agreements - the result of dialogue, via observing the whole set of various interests and common resolving of emerged controversies, and c) knowledge, mental flexibility and systems thinking - basic prerogatives for elevating the level of mutual understanding and consensus. (author)

  19. Continuous vasopressin replacement in diabetes insipidus.

    OpenAIRE

    Ralston, C; Butt, W

    1990-01-01

    Five children who developed diabetes insipidus as a manifestation of severe brain injury received continuous intravenous treatment with a solution containing both aqueous vasopressin and appropriate crystalloid replacement. Polyuria, hypernatraemia, and decreased urine osmolalities were safely corrected in all patients within eight to 28 hours.

  20. Value of the regurgitant volume to end diastolic volume ratio to predict the regression of left ventricular dimensions after valve replacement in aortic insufficiency

    NARCIS (Netherlands)

    P.M. Fioretti (Paolo); C. Tirtaman; E. Bos (Egbert); P.W.J.C. Serruys (Patrick); J.R.T.C. Roelandt (Jos)

    1987-01-01

    textabstractThe aim of this study was to assess the value of regurgitant stroke volume (RSV) to end-diastolic volume (EDV) ratio to predict the regression of left ventricular (LV) dimensions after uncomplicated valve replacement in 34 patients with severe pure aortic insufficiency. The RSV/EDV ratio

  1. Integrated Life Cycle Management: A Strategy for Plants to Extend Operating Lifetimes Safely with High Operational Reliability

    International Nuclear Information System (INIS)

    Esselman, Thomas; Bruck, Paul; Mengers, Charles

    2012-01-01

    Nuclear plant operators are studying the possibility of extending their existing generating facilities operating lifetime to 60 years and beyond. Many nuclear plants have been granted licenses to operate their facilities beyond the original 40 year term; however, in order to optimize the long term operating strategies, plant decision-makers need a consistent approach to support their options. This paper proposes a standard methodology to support effective decision-making for the long-term management of selected station assets. Methods detailed are intended to be used by nuclear plant site management, equipment reliability personnel, long term planners, capital asset planners, license renewal staff, and others that intend to look at operation between the current time and the end of operation. This methodology, named Integrated Life Cycle Management (ILCM), will provide a technical basis to assist decision makers regarding the timing of large capital investments required to get to the end of operation safely and with high plant reliability. ILCM seeks to identify end of life cycle failure probabilities for individual plant large capital assets and attendant costs associated with their refurbishment or replacement. It will provide a standard basis for evaluation of replacement and refurbishment options for these components. ILCM will also develop methods to integrate the individual assets over the entire plant thus assisting nuclear plant decision-makers in their facility long term operating strategies. (author)

  2. Arteriovenous renal replacement therapy in end-stage left-sided heart failure patients has a detrimental effect on patients with impaired right ventricular function

    Directory of Open Access Journals (Sweden)

    Evangelos Repasos, MD

    2017-07-01

    Conclusion: In patients with end-stage HF, the creation of AVC for intermittent RRT was followed by a significant increase in morbidity and mortality in comparison to the safe and effective placement of permanent central venous catheters. Patients with elevated PVR seem to comprise a group at high risk for adverse outcomes after central catheter insertion.

  3. replacement of the heart of the CMS experiment - the pixel #detector. Part2

    CERN Multimedia

    Brice, Maximilien

    2017-01-01

    This week, one of the Large Hadron Collider’s experiments gets a “heart transplant”. --- Physicists and engineers are replacing the heart of the CMS experiment - the pixel #detector. This will improve CMS’s ability to make precise measurements on aspects of the Standard Model, including the properties of the #HiggsBoson. The #LHC and its experiments are currently preparing to wake up this spring, when the accelerator will begin to collide particles once more at close to the speed of light. --- Today at 12:15 CET, join us live on #Facebook and ask us anything: https://www.facebook.com/cern/

  4. Intra-articular enzyme replacement therapy with rhIDUA is safe, well-tolerated, and reduces articular GAG storage in the canine model of mucopolysaccharidosis type I.

    Science.gov (United States)

    Wang, Raymond Y; Aminian, Afshin; McEntee, Michael F; Kan, Shih-Hsin; Simonaro, Calogera M; Lamanna, William C; Lawrence, Roger; Ellinwood, N Matthew; Guerra, Catalina; Le, Steven Q; Dickson, Patricia I; Esko, Jeffrey D

    2014-08-01

    Treatment with intravenous enzyme replacement therapy and hematopoietic stem cell transplantation for mucopolysaccharidosis (MPS) type I does not address joint disease, resulting in persistent orthopedic complications and impaired quality of life. A proof-of-concept study was conducted to determine the safety, tolerability, and efficacy of intra-articular recombinant human iduronidase (IA-rhIDUA) enzyme replacement therapy in the canine MPS I model. Four MPS I dogs underwent monthly rhIDUA injections (0.58 mg/joint) into the right elbow and knee for 6 months. Contralateral elbows and knees concurrently received normal saline. No intravenous rhIDUA therapy was administered. Monthly blood counts, chemistries, anti-rhIDUA antibody titers, and synovial fluid cell counts were measured. Lysosomal storage of synoviocytes and chondrocytes, synovial macrophages and plasma cells were scored at baseline and 1 month following the final injection. All injections were well-tolerated without adverse reactions. One animal required prednisone for spinal cord compression. There were no clinically significant abnormalities in blood counts or chemistries. Circulating anti-rhIDUA antibody titers gradually increased in all dogs except the prednisone-treated dog; plasma cells, which were absent in all baseline synovial specimens, were predominantly found in synovium of rhIDUA-treated joints at study-end. Lysosomal storage in synoviocytes and chondrocytes following 6 months of IA-rhIDUA demonstrated significant reduction compared to tissues at baseline, and saline-treated tissues at study-end. Mean joint synovial GAG levels in IA-rhIDUA joints were 8.62 ± 5.86 μg/mg dry weight and 21.6 ± 10.4 μg/mg dry weight in control joints (60% reduction). Cartilage heparan sulfate was also reduced in the IA-rhIDUA joints (113 ± 39.5 ng/g wet weight) compared to saline-treated joints (142 ± 56.4 ng/g wet weight). Synovial macrophage infiltration, which was present in all joints at baseline, was

  5. The end-to-end testbed of the optical metrology system on-board LISA Pathfinder

    Energy Technology Data Exchange (ETDEWEB)

    Steier, F; Cervantes, F Guzman; Marin, A F GarcIa; Heinzel, G; Danzmann, K [Max-Planck-Institut fuer Gravitationsphysik (Albert-Einstein-Institut) and Universitaet Hannover (Germany); Gerardi, D, E-mail: frank.steier@aei.mpg.d [EADS Astrium Satellites GmbH, Friedrichshafen (Germany)

    2009-05-07

    LISA Pathfinder is a technology demonstration mission for the Laser Interferometer Space Antenna (LISA). The main experiment on-board LISA Pathfinder is the so-called LISA Technology Package (LTP) which has the aim to measure the differential acceleration between two free-falling test masses with an accuracy of 3 x 10{sup -14} ms{sup -2} Hz{sup -1/2} between 1 mHz and 30 mHz. This measurement is performed interferometrically by the optical metrology system (OMS) on-board LISA Pathfinder. In this paper, we present the development of an experimental end-to-end testbed of the entire OMS. It includes the interferometer and its sub-units, the interferometer backend which is a phasemeter and the processing of the phasemeter output data. Furthermore, three-axes piezo-actuated mirrors are used instead of the free-falling test masses for the characterization of the dynamic behaviour of the system and some parts of the drag-free and attitude control system (DFACS) which controls the test masses and the satellite. The end-to-end testbed includes all parts of the LTP that can reasonably be tested on earth without free-falling test masses. At its present status it consists mainly of breadboard components. Some of those have already been replaced by engineering models of the LTP experiment. In the next steps, further engineering and flight models will also be inserted in this testbed and tested against well-characterized breadboard components. The presented testbed is an important reference for the unit tests and can also be used for validation of the on-board experiment during the mission.

  6. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  7. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  8. Some competition experiments with alang-alang (Imperata cylindrica (L.) Beauv.) in replacement series.

    Science.gov (United States)

    Eussen, J H H

    1979-01-01

    The interaction between alang-alang (Imperata cylindrica) and maize or sorghum was studied in competition experiments according to the replacement principle. Dry matter yield of alang-alang in these experiments appeared hardly affected by the presence of maize or sorghum, while this yield of the latter two was strongly reduced by the presence of alang-alang. The relative yield total (RYT) reached unity except in one experiment in which a value of 0.6 was obtained.The results suggest that the allelopathic activity of alang-alang will find expression in an RYT deviating from one only if alang-alang is not able to utilize all available space.

  9. A qualitative study of safe abortion and post-abortion family planning service experiences of women attending private facilities in Kenya.

    Science.gov (United States)

    Penfold, Suzanne; Wendot, Susy; Nafula, Inviolata; Footman, Katharine

    2018-04-24

    To inform improvements in safe abortion and post-abortion family planning (PAFP) services, this study aimed to explore the pathways, decision-making, experiences and preferences of women receiving safe abortion and post-abortion family planning (PAFP) at private clinics in western Kenya. We conducted semi-structured interviews with 22 women who had recently used a safe abortion service from a private clinic. Interviews explored abortion-seeking behaviour and decision-making, abortion experience, use and knowledge of contraception, experience of PAFP counselling, and perceived facilitators of and challenges to family planning use. Respondents discovered their pregnancies due to physical symptoms, which were confirmed using pregnancy testing kits, often purchased from pharmacies. Respondents usually discussed their abortion decision with their partner, and, sometimes, carefully-selected friends or family members. Some reported being referred to private clinics for abortion services directly from other providers. Others had more complex pathways, first seeking care from unsafe providers, trying to self-induce abortion, being turned away from alternative safe facilities that were closed or too busy, or taking time to gather financial resources to pay for care. Participants wanted to use abortion services at facilities reputed for being accessible, clean, medically safe, and offering quick, respectful, private and courteous services. Awareness of reputable clinics was gained through personal experience, and recommendations from contacts and other health providers. Most participants had previously used contraception, with some reports of incorrect use and many reports of side effects. PAFP counselling was valued by clients, but some accounts suggested the counselling lacked comprehensive information. Many women chose contraception immediately following PAFP counselling; but others wanted to delay decision-making about contraception until the abortion was complete

  10. Dual-sided electrosurgery handpiece for simultaneous tissue cutting and coagulation: first report on a conceptual design validated by an animal experiment.

    Science.gov (United States)

    Tawfik, Hatem A; Fouad, Yousef A; Hafez, Rashad

    2015-01-01

    To introduce and evaluate the safety of a novel dual-sided electrosurgery handpiece design for simultaneous tissue cutting and coagulation. We designed a prototype double-sided handpiece allowing automatic switching between two electrodes with a simple handpiece flip. The concept of the system as a surgical instrument was assessed by an animal experiment. The skin of 15 Wistar albino white rats could be successfully incised and coagulated using both ends of the handpiece, thereby confirming the prospects and clinical applications of the system. The dual-sided electrosurgery handpiece is a simple and safe alternative to the traditional electrosurgery pencil, allowing the simultaneous use of two electrodes without the hassle of frequent electrode replacement.

  11. Compilation and analysis of national and international OPEX for Safe Enclosure prior to decommissioning

    International Nuclear Information System (INIS)

    Dinner, Paul J.C.; Heimlich, Karel

    2016-01-01

    Around the world, a large number of aging nuclear plants are approaching final shutdown. While this is largely driven by plants reaching the end of their design life, economic factors such as low gas prices (in North America) and the smaller unit size of early commercial reactors are important contributors to this trend. In several instances, economic pressures have resulted in a need for a more rapid transition to Safe Enclosure than originally anticipated. Thus plans for this transition taking into account experience with Safe Enclosure periods of varying lengths are being actively prepared in many jurisdictions. The IAEA as well as other national and international authorities have long recognized the importance of the topic of Safe Enclosure and provided guidance, and the IAEA has recently undertaken a study of 'Lessons Learned from Deferred Decommissioning of Nuclear Facilities'. Beginning with preliminary experience from Canadian CANDU reactors in extended shutdown or safe enclosure, this paper aims to compare this experience with the larger pool of experience from the international community to: - classify the main issues or themes, - examine means to mitigate these, and - formulate general measures of 'good practice'. Compilation of this experience represents the first steps towards a comprehensive, searchable database potentially of use to many in the decommissioning community. Tabulation and analysis of the complete list (comprising approximately 70 cases) has provided the 'short list' of issues presented in Table 1. Examples of the most important listed issues are discussed. The authors' objective is to stimulate interest in extending this compilation. In this way it will continue to grow and benefit all those preparing for transition to decommissioning. (authors)

  12. Compilation and analysis of national and international OPEX or safe enclosure prior to decommissioning

    International Nuclear Information System (INIS)

    Dinner, Paul J.C.; Heimlich, Karel

    2016-01-01

    Around the world, a large number of aging nuclear plants are approaching final shutdown. While this is largely driven by plants reaching the end of their design life, economic factors such as low gas prices (in North America) and the smaller unit size of early commercial reactors are important contributors to this trend. In several instances, economic pressures have resulted in a need for a more rapid transition to Safe Enclosure than originally anticipated. Thus plans for this transition taking into account experience with Safe Enclosure periods of varying lengths are being actively prepared in many jurisdictions. The IAEA as well as other national and international authorities have long recognized the importance of the topic of Safe Enclosure and provided guidance [1-7], and the IAEA has recently undertaken a study of 'Lessons Learned from Deferred Decommissioning of Nuclear Facilities' [8]. Beginning with preliminary experience from Canadian CANDU reactors in extended shutdown or safe enclosure, this paper aims to compare this experience with the larger pool of experience from the international community to: - classify the main issues or themes, - examine means to mitigate these, and - formulate general measures of 'good practice'. Compilation of this experience represents the first steps towards a comprehensive, searchable database potentially of use to many in the decommissioning community. Tabulation and analysis of the complete list (comprising approximately 70 cases) has provided the 'short list' of issues presented. Examples of the most important listed issues are discussed. The authors' objective is to stimulate interest in extending this compilation. In this way it will continue to grow and benefit all those preparing for transition to decommissioning. (authors)

  13. Doctors' learning experiences in end-of-life care

    DEFF Research Database (Denmark)

    Fosse, Anette; Ruths, Sabine; Malterud, Kirsti

    2017-01-01

    death could even be welcomed. Through challenging dialogues dealing with family members’ hope and trust, they learnt how to adjust words and decisions according to family and patient’s life story. Interdisciplinary role models helped them balance uncertainty and competence in the intermediate position......Background: Doctors often find dialogues about death difficult. In Norway, 45% of deaths take place in nursing homes. Newly qualified medical doctors serve as house officers in nursing homes during internship. Little is known about how nursing homes can become useful sites for learning about end-of-life...... care. The aim of this study was to explore newly qualified doctors’ learning experiences with end-of-life care in nursing homes, especially focusing on dialogues about death. Methods: House officers in nursing homes (n = 16) participated in three focus group interviews. Interviews were audiotaped...

  14. Safe delivery practices: experience from cross-sectional data of Bangladeshi women.

    Science.gov (United States)

    Kabir, M A; Goh, Kim-Leng; Khan, M M H; Al-Amin, Abul Quasem; Azam, Mohammad Nurul

    2015-03-01

    This study examines the safe delivery practices of Bangladeshi women using data on 4905 ever-married women aged 15 to 49 years from the 2007 Bangladesh Demographic and Health Survey. Variables that included age, region of origin, education level of respondent and spouse, residence, working status, religion, involvement in NGOs, mass media exposure, and wealth index were analyzed to find correlates of safe delivery practices. More than 80% of the deliveries took place at home, and only 18% were under safe and hygienic conditions. The likelihood of safe deliveries was significantly lower among younger and older mothers than middle-aged mothers and higher among educated mothers and those living in urban areas. Economically better-off mothers and those with greater exposure to mass media had a significantly higher incidence of safe delivery practices. A significant association with religion and safe delivery practices was revealed. Demographic, socioeconomic, cultural, and programmatic factors that are strongly associated with safe delivery practices should be considered in the formulation of reproductive health policy. © 2012 APJPH.

  15. Risks and benefits of citrate anticoagulation for continuous renal replacement therapy.

    Science.gov (United States)

    Shum, H P; Yan, W W; Chan, T M

    2015-04-01

    Heparin, despite its significant side-effects, is the most commonly used anticoagulant for continuous renal replacement therapy in critical care setting. In recent years, citrate has gained much popularity by improving continuous renal replacement therapy circuit survival and decreasing blood transfusion requirements. However, its complex metabolic consequences warrant modification in the design of the citrate-based continuous renal replacement therapy protocol. With thorough understanding of the therapeutic mechanism of citrate, a simple and practicable protocol can be devised. Citrate-based continuous renal replacement therapy can be safely and widely used in the clinical setting with appropriate clinical staff training.

  16. Learning end-of-life care within a constructivist model: Undergraduate nursing students’ experiences

    Directory of Open Access Journals (Sweden)

    Anna E. van der Wath

    2015-11-01

    Full Text Available Background: Although nursing education aims to equip nursing students to provide care to dying patients and their families, nurses often feel ill-prepared to cope with the emotional labour involved in end-of-life care. Objectives: The aim of the study was to explore and describe nursing students’ experiences of end-of-life care through experiential learning within a constructivist educational model. Method: A qualitative, descriptive design was used. As part of introducing experiential learning, innovative educational practices were initiated during a second year level undergraduate nursing module on end-of-life care. Qualitative data on second-year nursing students’ experiences were collected through written reflections and analysed using open coding. Results: The themes that emerged revealed participants’ sensory and emotional experiences during the learning opportunities. Participants reflected on what they learnt and clarified their values related to death and dying. They indicated how they would apply the new meanings constructed in clinical practice. Conclusion: A constructivist educational model of experiential learning holds potential to enhance value clarification and nursing students’ sensory and emotional awareness of death and dying. Experiential learning is recommended to develop nursing students’ competency inproviding end-of-life care.

  17. The current status of mitigation, experience and repair regarding Alloy 600 issues on Japanese steam generator nozzles

    International Nuclear Information System (INIS)

    Hiro, T.; Okabe, T.; Inoue, T.

    2009-01-01

    One conspicuous problem seen in aged PWR plants is the PWSCC, which is considered to be caused by three factors, which are environment, material and stress. The degradation caused by PWSCC on high nickel content alloy (Alloy 600) at dissimilar material weld joints of steam generator nozzles has became conspicuous in Japan. This paper describes the mitigation technique used for the PWSCC, recent experiences on PWSCC issues and repair techniques implemented on Japanese steam generator nozzles with Alloy 600 weld. As a countermeasure against the PWSCC, ultrasonic shot peening (USP) was planned and conducted on the SG nozzles as a preventive maintenance in Japan. It has been confirmed that the stress near the inner surface can be converted into compressive stress by applying plastic strain to the surface using collision force of the shot material during the shot peening. USP employs the ultrasonic-wave vibration. The effects of this peening technique were confirmed by qualified test if there were undetectable cracks by ECT on the surface of the material. In Japan, there were 15 plants with SG nozzles which had Alloy 600 welds and these SG nozzles were inspected by ECT or VT as a confirmatory inspection before conducting the USP operation from 2006 to 2008. In these inspections, defects have been found at 19 hot nozzles in 8 plants. In addition, the defect in one of the plants has been found at the safe-end base metal made from stainless steel. In the root cause investigation result, it was confirmed that these cracks were typical PWSCC induced by high residual stress. These nozzles with defects were repaired by replacing the Alloy 600 welding material on surfaces exposed to primary water with the Alloy 690 welding material which has excellent PWSCC resistance. These material replacements were performed by cladding or replacement of nozzle safe end joint. These techniques are used not only to repair but also as a preventive maintenance. These mitigation or repair

  18. Renal replacement therapy in Latin American end-stage renal disease

    Science.gov (United States)

    Rosa-Diez, Guillermo; Gonzalez-Bedat, Maria; Pecoits-Filho, Roberto; Marinovich, Sergio; Fernandez, Sdenka; Lugon, Jocemir; Poblete-Badal, Hugo; Elgueta-Miranda, Susana; Gomez, Rafael; Cerdas-Calderon, Manuel; Almaguer-Lopez, Miguel; Freire, Nelly; Leiva-Merino, Ricardo; Rodriguez, Gaspar; Luna-Guerra, Jorge; Bochicchio, Tomasso; Garcia-Garcia, Guillermo; Cano, Nuria; Iron, Norman; Cuero, Cesar; Cuevas, Dario; Tapia, Carlos; Cangiano, Jose; Rodriguez, Sandra; Gonzalez, Haydee; Duro-Garcia, Valter

    2014-01-01

    The Latin American Dialysis and Renal Transplant Registry (RLADTR) was founded in 1991; it collects data from 20 countries which are members of Sociedad Latinoamericana de Nefrología e Hipertension. This paper presents the results corresponding to the year 2010. This study is an annual survey requesting data on incident and prevalent patients undergoing renal replacement treatment (RRT) in all modalities: hemodialysis (HD), peritoneal dialysis (PD) and living with a functioning graft (LFG), etc. Prevalence and incidence were compared with previous years. The type of renal replacement therapy was analyzed, with special emphasis on PD and transplant (Tx). These variables were correlated with the gross national income (GNI) and the life expectancy at birth. Twenty countries participed in the surveys, covering 99% of the Latin American. The prevalence of end stage renal disease (ESRD) under RRT in Latin America (LA) increased from 119 patients per million population (pmp) in 1991 to 660 pmp in 2010 (HD 413 pmp, PD 135 pmp and LFG 111 pmp). HD proportionally increased more than PD, and Tx HD continues to be the treatment of choice in the region (75%). The kidney Tx rate increased from 3.7 pmp in 1987 to 6.9 pmp in 1991 and to 19.1 in 2010. The total number of Tx's in 2010 was 10 397, with 58% deceased donors. The total RRT prevalence correlated positively with GNI (r2 0.86; P < 0.05) and life expectancy at birth (r2 0.58; P < 0.05). The HD prevalence and the kidney Tx rate correlated significantly with the same indexes, whereas the PD rate showed no correlation with these variables. A tendency to rate stabilization/little growth was reported in the most regional countries. As in previous reports, the global incidence rate correlated significantly only with GNI (r2 0.63; P < 0.05). Diabetes remained the leading cause of ESRD. The most frequent causes of death were cardiovascular (45%) and infections (22%). Neoplasms accounted for 10% of the causes of death. The

  19. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  20. Inspection and replacement of baffle assembly screws inside American reactor vessels

    International Nuclear Information System (INIS)

    Neal, K.; Chaumont, J.C.

    1999-01-01

    The baffle assembly inside the vessel of a 900 MWe reactor designed by Framatome, is made up of 44 plates fixed on 8 horizontal supports by a system of about 1000 screws. These plates undergo high neutron flux and the problem of screw cracking appeared at the end of the eighties in the first-generation reactors. The first operation on a large scale concerning the screws of a Westinghouse type reactor, was performed on the Tihange-1 power plant where Framatome controlled 960 screws and replaced 91. In 1997 as a consequence of the Belgian and French feedback experience, American plant operators launched a vast program of preventive actions: material analysis, inspection of baffle plate screws and replacement of defective screws. This program was held in cooperation with EPRI (electric power research institute) and under the control of NRC (nuclear regulatory commission). Framatome Technologies Inc (FTI) was in charge of the in-situ inspection and replacement of the screws. FTI designed special tools and equipment adapted to the 2-loop American reactors but the basis ideas were those applied on the Tihange reactor. The successful experience of FTI has allowed the firm to be commissioned for 6 2-loops American reactors. (A.C.)

  1. End plug welding of nuclear fuel elements-AFFF experience

    International Nuclear Information System (INIS)

    Bhatt, R.B.; Singh, S.; Aniruddha Kumar; Amit; Arun Kumar; Panakkal, J.P.; Kamath, H.S.

    2004-01-01

    Advanced Fuel Fabrication Facility is engaged in the fabrication of mixed oxide (U,Pu)O 2 fuel elements of various types of nuclear reactors. Fabrication of fuel elements involves pellet fabrication, stack making, stack loading and end plug welding. The requirement of helium bonding gas inside the fuel elements necessitates the top end plug welding to be carried out with helium as the shielding gas. The severity of the service conditions inside a nuclear reactor imposes strict quality control criteria, which demands for almost defect free welds. The top end plug welding being the last process step in fuel element fabrication, any rejection at this stage would lead to loss of effort prior to this step. Moreover, the job becomes all the more difficult with mixed oxide (MOX) as the entire fabrication work has to be carried out in glove box trains. In the case of weld rejection, accepted pellets are salvaged by cutting the clad tube. This is a difficult task and recovery of pellets is low (requiring scrap recovery operation) and also leads to active metallic waste generation. This paper discusses the experience gained at AFFF, in the past 12 years in the area of end plug welding for different types of MOX fuel elements

  2. FELIX: The New Approach for Interfacing to Front-end Electronics for the ATLAS Experiment

    CERN Document Server

    AUTHOR|(SzGeCERN)754725; The ATLAS collaboration; Anderson, John Thomas; Borga, Andrea; Boterenbrood, Hendrik; Chen, Hucheng; Chen, Kai; Drake, Gary; Donszelmann, Mark; Francis, David; Gorini, Benedetto; Guest, Daniel; Lanni, Francesco; Lehmann Miotto, Giovanna; Levinson, Lorne; Roich, Alexander; Schreuder, Frans Philip; Schumacher, J\\"orn; Vandelli, Wainer; Zhang, Jinlong

    2016-01-01

    From the ATLAS Phase-I upgrade and onward, new or upgraded detectors and trigger systems will be interfaced to the data acquisition, detector control and timing (TTC) systems by the Front-End Link eXchange (FELIX). FELIX is the core of the new ATLAS Trigger/DAQ architecture. Functioning as a router between custom serial links and a commodity network, FELIX is implemented by server PCs with commodity network interfaces and PCIe cards with large FPGAs and many high speed serial fiber transceivers. By separating data transport from data manipulation, the latter can be done by software in commodity servers attached to the network. Replacing traditional point-to-point links between Front-end components and the DAQ system by a switched network, FELIX provides scaling, flexibility uniformity and upgradability and reduces the diversity of custom hardware solutions in favour of software.

  3. Identification of efforts required for continued safe operation of KANUPP

    International Nuclear Information System (INIS)

    Ghafoor, M.A.; Hashmi, J.A.; Siddiqui, Z.H.

    1991-01-01

    Kanupp, the first commercial CANDU PHWR, rated at 137 MWe, was built on turnkey basis by the Canadian General Electric Company for the Pakistan Atomic Energy Commission, and went operational in October, 1972 near Karachi. It has operated since then with a lifetime average availability factor of 51.5% and capacity factor of 25%. In 1976, Kanupp suffered loss of technical support from its original vendors due to the Canadian embargo on export of nuclear technology. Simultaneously, the world experienced the most explosive development and advancement in electronic and computer technology, accelerating the obsolescence of such equipment and systems installed in Kanupp. Replacement upgrading of obsolete computers, control and instrumentation was thus the first major set of efforts realized as essential f or continued safe operation. On the other hand, Kanupp was able to cope with the normal maintenance of its process, mechanical and electrical equipment till the late 80's. But now many of these components are reaching the end of their useful life, and developing chronic problems due to ageing, which can only be solved by complete replacement. This is much more difficult for custom-made nuclear process equipment, e.g. the reactor internals and the fuelling machine. Public awareness and international concern about nuclear safety have increased significantly since the TMI and Chernobyl events. Corresponding realization of the critical role of human factors and the importance of operational experience feedback, has helped Kanupp by opening international channels of communication, including renewed cooperation on CANDU technology. The safety standards and criteria for CANDU as well as other NPPs have matured and evolved gradually over the past two decades. First Kanupp has to ensure that its present ageing-induced equipment problems are resolved to satisfy the original safety requirements and public risk targets which are still internationally acceptable. But as a policy, we

  4. Identification of efforts required for continued safe operation of KANUPP

    Energy Technology Data Exchange (ETDEWEB)

    Ghafoor, M A; Hashmi, J A; Siddiqui, Z H [Karachi Nuclear Power Plant, Karachi (Pakistan)

    1991-04-01

    Kanupp, the first commercial CANDU PHWR, rated at 137 MWe, was built on turnkey basis by the Canadian General Electric Company for the Pakistan Atomic Energy Commission, and went operational in October, 1972 near Karachi. It has operated since then with a lifetime average availability factor of 51.5% and capacity factor of 25%. In 1976, Kanupp suffered loss of technical support from its original vendors due to the Canadian embargo on export of nuclear technology. Simultaneously, the world experienced the most explosive development and advancement in electronic and computer technology, accelerating the obsolescence of such equipment and systems installed in Kanupp. Replacement upgrading of obsolete computers, control and instrumentation was thus the first major set of efforts realized as essential f or continued safe operation. On the other hand, Kanupp was able to cope with the normal maintenance of its process, mechanical and electrical equipment till the late 80's. But now many of these components are reaching the end of their useful life, and developing chronic problems due to ageing, which can only be solved by complete replacement. This is much more difficult for custom-made nuclear process equipment, e.g. the reactor internals and the fuelling machine. Public awareness and international concern about nuclear safety have increased significantly since the TMI and Chernobyl events. Corresponding realization of the critical role of human factors and the importance of operational experience feedback, has helped Kanupp by opening international channels of communication, including renewed cooperation on CANDU technology. The safety standards and criteria for CANDU as well as other NPPs have matured and evolved gradually over the past two decades. First Kanupp has to ensure that its present ageing-induced equipment problems are resolved to satisfy the original safety requirements and public risk targets which are still internationally acceptable. But as a policy, we

  5. Both movement-end and task-end are critical for error feedback in visuomotor adaptation: a behavioral experiment.

    Directory of Open Access Journals (Sweden)

    Takumi Ishikawa

    Full Text Available An important issue in motor learning/adaptation research is how the brain accepts the error information necessary for maintaining and improving task performance in a changing environment. The present study focuses on the effect of timing of error feedback. Previous research has demonstrated that adaptation to displacement of the visual field by prisms in a manual reaching task is significantly slowed by delayed visual feedback of the endpoint, suggesting that error feedback is most effective when given at the end of a movement. To further elucidate the brain mechanism by which error information is accepted in visuomotor adaptation, we tested whether error acceptance is linked to the end of a given task or to the end of an executed movement. We conducted a behavioral experiment using a virtual shooting task in which subjects controlled their wrist movements to meet a target with a cursor as accurately as possible. We manipulated the timing of visual feedback of the impact position so that it occurred either ahead of or behind the true time of impact. In another condition, the impact timing was explicitly indicated by an additional cue. The magnitude of the aftereffect significantly varied depending on the timing of feedback (p < 0.05, Friedman's Test. Interestingly, two distinct peaks of aftereffect were observed around movement-end and around task-end, irrespective of the existence of the timing cue. However, the peak around task-end was sharper when the timing cue was given. Our results demonstrate that the brain efficiently accepts error information at both movement-end and task-end, suggesting that two different learning mechanisms may underlie visuomotor transformation.

  6. A new three-dimensional, print-on-demand temporomandibular prosthetic total joint replacement system: Preliminary outcomes.

    Science.gov (United States)

    Dimitroulis, George; Austin, Stephen; Sin Lee, Peter Vee; Ackland, David

    2018-05-16

    The aim of this study is to present the preliminary clinical data on the OMX Temporomandibular Joint (TMJ) Prosthetic total joint replacement system. A prospective, cohort, clinical study was undertaken of consecutive adult patients with Category 5 end-stage joint disease who were implanted with the OMX TMJ prosthesis between May 2015 and April 2017. A total of 50 devices were implanted in 38 patients, with 12 patients receiving bilateral prosthetic joints. There were 31 females and 7 males in this cohort, who ranged in age from 20 to 66 years, with a mean of 43.8 years (±14.0 years). Ten of the 50 prosthetic joints (20%) were fully customized, while the remaining were patient matched using virtual planning software. Based on a mean follow-up period of 15.3 months (range 12-24 months) following the TMJ total joint replacement, preliminary results suggest the OMX TMJ prosthesis has made a positive impact on clinical outcomes, with a mean 74.4% reduction in joint pain levels and significant improvements (p < 0.05) in jaw function as measured by the visual analogue scales for mouth opening (30.8%), diet (77.1%), and function (59.2%). No device failures were reported during the study period. This study suggests that the print-on-demand OMX TMJ prosthesis, designed for rapid delivery of both patient-matched and fully customize devices, represents a safe, reliable and versatile implantable joint replacement system for the treatment of category 5 end-stage TMJ disease. Copyright © 2018 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  7. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  8. Replacing fuel alignment in Germany

    International Nuclear Information System (INIS)

    Poetz, F.; Kalthoff, W.

    1991-01-01

    Up to the end of 1989 varying numbers of broken fuel alignment pins were detected in several German PWRs (80 broken pins in all). The distribution of these broken pins over the core cross-section was more or less random. The problem was due to the stress corrosion cracking of the pin material and was restricted to individual pins. It was concluded that all fuel alignment pins made of Inconel X-750 should be replaced. The development of a new pin, more resistant to intergranular stress corrosion, and the replacement technique are outlined. (author)

  9. Logistic Vehicle System Replacement Cost Estimate

    National Research Council Canada - National Science Library

    Stinson, Margaret

    1998-01-01

    The Logistics Vehicle System (LVS) was originally fielded from 1985-1989. Most of the LVS fleet will reach end-of-service life in 2005, therefore the goal of the Logistics Vehicle System Replacement (LVSR...

  10. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  11. Prosthetic valve sparing aortic root replacement: an improved technique.

    Science.gov (United States)

    Leacche, Marzia; Balaguer, Jorge M; Umakanthan, Ramanan; Byrne, John G

    2008-10-01

    We describe a modified surgical technique to treat patients with a previous history of isolated aortic valve replacement who now require aortic root replacement for an aneurysmal or dissected aorta. This technique consists of replacing the aortic root with a Dacron conduit, leaving intact the previously implanted prosthesis, and re-implanting the coronary arteries in the Dacron graft. Our technique differs from other techniques in that we do not leave behind any aortic tissue remnant and also in that we use a felt strip to obliterate any gap between the old sewing ring and the newly implanted graft. In our opinion, this promotes better hemostasis. We demonstrate that this technique is safe, feasible, and results in acceptable outcomes.

  12. Synthesis of Hollow Gold-Silver Alloyed Nanoparticles: A "Galvanic Replacement" Experiment for Chemistry and Engineering Students

    Science.gov (United States)

    Jenkins, Samir V.; Gohman, Taylor D.; Miller, Emily K.; Chen, Jingyi

    2015-01-01

    The rapid academic and industrial development of nanotechnology has led to its implementation in laboratory teaching for undergraduate-level chemistry and engineering students. This laboratory experiment introduces the galvanic replacement reaction for synthesis of hollow metal nanoparticles and investigates the optical properties of these…

  13. The Effects of Response Effort on Safe Performance by Therapists at an Autism Treatment Facility

    Science.gov (United States)

    Casella, Sarah E.; Wilder, David A.; Neidert, Pamela; Rey, Catalina; Compton, Megan; Chong, Ivy

    2010-01-01

    The effects of response effort on safe behaviors (i.e., glove wearing, hand sanitizing, and electrical outlet replacement) exhibited by therapists at an autism treatment center were examined. Participants were exposed to 2 or 3 levels of effort (i.e., high, medium, low) for each dependent variable. Results showed increased safe performance during…

  14. A study of the impact of disease burden in quality of life of people with pre-End-Stage and End-Stage Renal Disease

    Directory of Open Access Journals (Sweden)

    Helen Georgiadou

    2017-10-01

    Full Text Available Introduction: Diabetes Mellitus (DM is a common chronic disease accompanied by severe complications. It is the leading cause of End-Stage Renal Disease (ESRD requiring management either by haemodialysis (HD or peritoneal dialysis (PD. The chronicity of the disease, and its complications, affects the psychological, family and social life of the patients and their Quality of Life (QoL. Aim: of the present study was to estimate the disease burden of patients with diabetic nephropathy (DN during pre-ESRD and during End-Stage Renal Disease. Methods: A sample of 103 patients with DN treated at the General Hospital of Veria were studied during May and June 2016. The study was conducted using the Dialysis Symptoms Index (DSI for the assessment of Chronic Kidney Disease (CKD symptom load and the European Quality of Life (EuroQol questionnaire for assessing the QoL of patients in the Renal Outpatient Clinic, Haemodialysis and Peritoneal Dialysis Unit. Results: It was found that the Renal Replacement Method (HD or PD, the presence of DM and CKD’s stage affect significantly the patients’ self-assessment regarding painful symptoms of DN. Furthermore, the above factors have major impact on some aspects of patients’ QoL, such as mobility and self-care. Conclusions: Pre-End Stage patients experience more severe painful symptoms of DN compared to patients on Renal Replacement Therapies.

  15. Heart valve replacement with the Sorin tilting-disc prosthesis. A 10-year experience.

    Science.gov (United States)

    Milano, A; Bortolotti, U; Mazzucco, A; Mossuto, E; Testolin, L; Thiene, G; Gallucci, V

    1992-02-01

    From 1978 to 1988, 697 patients with a mean age of 48 +/- 11 years (range 5 to 75 years) received a Sorin tilting-disc prosthesis; 358 had had aortic valve replacement, 247 mitral valve replacement, and 92 mitral and aortic valve replacement. Operative mortality rates were 7.8%, 11.3%, and 10.8%, respectively, in the three groups. Cumulative duration of follow-up is 1650 patient-years for aortic valve replacement (maximum follow-up 11.4 years), 963 patient-years for mitral valve replacement (maximum follow-up 9.9 years) and 328 patient-years for mitral and aortic valve replacement (maximum follow-up 9.4 years). Actuarial survival at 9 years is 72% +/- 4% after mitral valve replacement, 70% +/- 3% after aortic valve replacement, and 50% +/- 12% after mitral and aortic valve replacement, and actuarial freedom from valve-related deaths is 97% +/- 2% after mitral valve replacement, 92% +/- 2% after aortic valve replacement, and 62% +/- 15% after mitral and aortic valve replacement. Thromboembolic events occurred in 21 patients with aortic valve replacement (1.3% +/- 0.2%/pt-yr), in 12 with mitral valve replacement (1.2% +/- 0.3% pt-yr), and in seven with mitral and aortic valve replacement (2.1% +/- 0.8%), with one case of prosthetic thrombosis in each group; actuarial freedom from thromboembolism at 9 years is 92% +/- 3% after mitral valve replacement, 91% +/- 3% after aortic valve replacement, and 74% +/- 16% after mitral and aortic valve replacement. Anticoagulant-related hemorrhage was observed in 15 patients after aortic valve replacement (0.9% +/- 0.2%/pt-yr), in 9 after mitral valve replacement (0.9% +/- 0.3%/pt-yr), and in 6 with mitral and aortic valve replacement (0.9% +/- 0.5%/pt-yr); actuarial freedom from this complication at 9 years is 94% +/- 2% after aortic valve replacement, 91% +/- 4% after mitral valve replacement, and 68% +/- 16% after mitral and aortic valve replacement. Actuarial freedom from reoperation at 9 years is 97% +/- 2% after mitral and

  16. [EU-Cosmetics: timetables for the replacement of animal experiments].

    Science.gov (United States)

    Ruhdel, Irmela Wiltrud

    2005-01-01

    According to the 7(th) Amendment of the Cosmetics Directive the European Commission had to establish timetables for the phasing out of the various animal tests for the safety evaluation of ingredients used in cosmetics. However, the published timetables do not reflect the objectives of the 7(th) Amendment but contain longer deadlines for the ban on animal experiments of several endpoints. The European Commission also had to draw up a Directive for establishing an Annex IX that should list validated alternative methods which are not already listed in Annex V of the Dangerous Substances Directive. Although various alternative methods could have been listed in this Annex IX, the Commission published an empty table. From the point of view of the German Animal Welfare Federation amendments of the timetables and the Directive establishing Annex IX are urgently required. Additionally, the Commission has to provide optimal conditions for the replacement of alternative methods.

  17. Reposição de cães em área endêmica para leishmaniose visceral Dog replacement in an area endemic for visceral leishmaniasis

    Directory of Open Access Journals (Sweden)

    Andréa Maria Andrade

    2007-10-01

    Full Text Available Esse trabalho objetivou estimar a reposição de cães em área endêmica para leishmaniose visceral, onde a eutanásia de animais soropositivos é indicada como medida de controle, e avaliar os motivos que levaram a aquisição ou não de novos animais. Houve a reposição em 44,5% dos casos, principalmente devido à necessidade de companhia ou guarda. O principal motivo para a não-reposição foi o temor da leishmaniose visceral.This study aimed to estimate the dog replacement rate in an area endemic for visceral leishmaniasis, in which slaughter of seropositive animals was indicated as a control measure, and to evaluate the reasons why new animals were or were not acquired. The animals were replaced in 44.5% of the cases, and this was done mainly because of the need for a companion or guard dog. The main reason for not replacing the dog was fear of visceral leishmaniasis.

  18. An experience of renal replacement therapy in children

    International Nuclear Information System (INIS)

    Jamal, A.; Ramzan, A.

    2002-01-01

    Objective: To determine the prevalence of renal failure in children requiring renal replacement therapy (RRT), the types of RRT being performed, problems encountered during the procedure and the outcome of the RRT in pediatric age group. Design: It was a retrospective study on pediatric patients with renal failure undergoing RRT. Place and Duration of Study: The study was carried out at National Institute of Child Health (N. I. C. H) covering a period of four years. Subjects and Methods: The study included all pediatric patients of acute renal failure, chronic renal failure and end stage renal disease who underwent RRT at N. I. C. H. Results: 17% of the patients with renal disease came in renal failure. A total of 65. 04 % patients received RT. Out of these, 84.7% underwent peritoneal dialysis (PD) while 15.3 % required hemodialysis and 2 were successfully transplanted. High cost of the RRT was the most commonly encountered problem during the procedure. Peritonitis was the commonest complication faced during the peritoneal dialysis while hypotension and complications related to vascular access were commonest during hemodialysis. About 50% of the patients undergoing peritoneal dialysis were left with persistent renal impairment while hemodialysis revealed a mortality of 37%. The two transplanted patients were doing well. Conclusion: The study showed that renal failure was a fairly common problem in pediatric age group and the prospects of successful RRT in Pakistan were quite high with a little effort on the part of medical professionals along with some financial assistance from the affluent of the country. (author)

  19. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  20. NDT: Replication avoids unnecessary replacement of power plant components

    International Nuclear Information System (INIS)

    Neubauer, B.; Wedel, U.

    1984-01-01

    Effective fracture prevention for components operating at high temperatures can be achieved without sacrificing useful life. This is done by nondestructive-metallographic examination at crack-susceptible locations of the components. Creep microcracks approximately one micron in size can be detected. RWTUV experience shows that, in general, the components need not be replaced or repaired until these microcracks have grown to form small creep macrocracks. The long prewarning period before macrocracks form provides assurance of safe operation for the full useful life of the components tested. The economic benefit achieved is considerable. Replication techniques have been widely applied by the authors in operating power plants since 1977. This nondestructive-evaluation method involves polishing small areas of selected piping-system components, preparing replicas of the polished areas, and examining the replicas under microscope for evidence of cavities, microcracks, or macrocracks

  1. Placement of the radiochemical processing plant at Oak Ridge National Laboratory into a safe standby condition

    International Nuclear Information System (INIS)

    Holladay, D.W.; Bopp, C.D.; Farmer, A.J.; Johnson, J.K.; Miller, C.H.; Powers, B.A.; Collins, E.D.

    1986-01-01

    Extensive upgrade, cleanup, and decontamination efforts are being conducted for appropriate areas in the Radiochemical Processing Plant (RPP) with the goal of achieving safe standby condition by the end of FY 1989. The ventilation system must maintain containment thus, it is being upgraded via demolition and replacement of marginally adequate ductwork, fans, and control systems. Areas that are being decontaminated and stripped of various services (e.g., piping, ductwork, and process tanks) include hot cells, makeup rooms, and pipe tunnels. Operating equipment that is being decontaminated includes glove boxes and hoods. Replacement of the ventilation system and removal of equipment from pipe tunnels, cells, and makeup rooms are accomplished by contact labor by workers using proper attire, safety rules, and shielding, Removal of contaminated ductwork and piping is conducted with containment enclosures that are strategically located at breakpoints, and methods of separation are chosen to conform with health physics requirements. The methods of cutting contaminated piping and ductwork include portable reciprocating saws, pipe cutters, burning, and plasma torch. Specially designed containment enclosures will be used to prevent the spread of radioactive contamination while maintaining adequate ventilation

  2. Placement of the radiochemical processing plant at Oak Ridge National Laboratory into a safe standby condition

    International Nuclear Information System (INIS)

    Holladay, D.W.; Bopp, C.D.; Farmer, A.J.; Johnson, J.K.; Miller, C.H.; Powers, B.A.; Collins, E.D.

    1986-01-01

    Extensive upgrade, cleanup, and decontamination efforts are being conducted for appropriate areas in the Radiochemical Processing Plant (RPP) with the goal of achieving ''safe standby'' condition by the end of FY 1989. The ventilation system must maintain containment; thus, it is being upgraded via demolition and replacement of marginally adequate ductwork, fans, and control systems. Areas that are being decontaminated and stripped of various services (e.g., piping, ductwork, and process tanks) include hot cells, makeup rooms, and pipe tunnels. Operating equipment that is being decontaminated includes glove boxes and hoods. Replacement of the ventilation system and removal of equipment from pipe tunnels, cells, and makeup rooms are accomplished by contact labor by workers using proper attire, safety rules, and shielding. Removal of contaminated ductwork and piping is conducted with containment enclosures that are strategically located at breakpoints, and methods of separation are chosen to conform with health physics requirements. The methods of cutting contaminated piping and ductwork include portable reciprocating saws, pipe cutters, burning, and plasma torch. Specially designed containment enclosures will be used to prevent the spread of radioactive contamination while maintaining adequate ventilation. 6 figs

  3. Comparing 30-day all-cause readmission rates between tibiotalar fusion and total ankle replacement.

    Science.gov (United States)

    Merrill, Robert K; Ferrandino, Rocco M; Hoffman, Ryan; Ndu, Anthony; Shaffer, Gene W

    2018-01-12

    End-stage ankle arthritis is a debilitating condition that negatively impacts patient quality of life. Tibiotalar fusion and total ankle replacement are treatment options for managing ankle arthritis. Few studies have examined short term readmission rates of these two procedures. The objective of this study was compare all-cause 30-day readmission rates between patients undergoing tibiotalar fusion vs. total ankle replacement. This study queried the Nationwide Readmission Database (NRD) from 2013-2014 and used international classification of disease, 9th revision (ICD-9) procedure codes to identify all patients who underwent a tibiotalar fusion or a total ankle replacement. Comorbidities, insurance status, hospital characteristics, and readmission rates were statistically compared between the two cohorts. Risk factors were then identified for 30-day readmission. A total of 5660 patients were analyzed with 2667 in the tibiotalar fusion cohort and 2993 in the total ankle replacement cohort. Univariate analysis revealed that the readmission rate after tibiotalar fusion (4.4%) was statistically greater than after total ankle replacement (1.4%). Multivariable regression analysis indicated that deficiency anemia (OR 2.18), coagulopathy (OR 3.51), renal failure (OR 2.83), other insurance relative to private (OR 3.40), and tibiotalar fusion (OR 2.51) were all statistically significant independent risk factors for having a readmission within 30-days. These findings suggest that during the short-term period following discharge from the hospital, patients who received a tibiotalar fusion are more likely to experience a 30-day readmission. These findings are important for decision making when a surgeon encounters a patient with end stage ankle arthritis. Level III, cohort study. Published by Elsevier Ltd.

  4. Safe Day Case Adenotonsillectomy: Experience from a Private ...

    African Journals Online (AJOL)

    ... hypertrophy. Conclusion: Day case tonsillectomies in private hospitals settings are safe with few complications that are often not life threatening. It should be encouraged in our environment in private hospitals where the facilities are available. Key Words Day case tonsillectomy, adenotonsillectomy, otolaryngology ...

  5. End-to-end experiment management in HPC

    Energy Technology Data Exchange (ETDEWEB)

    Bent, John M [Los Alamos National Laboratory; Kroiss, Ryan R [Los Alamos National Laboratory; Torrez, Alfred [Los Alamos National Laboratory; Wingate, Meghan [Los Alamos National Laboratory

    2010-01-01

    Experiment management in any domain is challenging. There is a perpetual feedback loop cycling through planning, execution, measurement, and analysis. The lifetime of a particular experiment can be limited to a single cycle although many require myriad more cycles before definite results can be obtained. Within each cycle, a large number of subexperiments may be executed in order to measure the effects of one or more independent variables. Experiment management in high performance computing (HPC) follows this general pattern but also has three unique characteristics. One, computational science applications running on large supercomputers must deal with frequent platform failures which can interrupt, perturb, or terminate running experiments. Two, these applications typically integrate in parallel using MPI as their communication medium. Three, there is typically a scheduling system (e.g. Condor, Moab, SGE, etc.) acting as a gate-keeper for the HPC resources. In this paper, we introduce LANL Experiment Management (LEM), an experimental management framework simplifying all four phases of experiment management. LEM simplifies experiment planning by allowing the user to describe their experimental goals without having to fully construct the individual parameters for each task. To simplify execution, LEM dispatches the subexperiments itself thereby freeing the user from remembering the often arcane methods for interacting with the various scheduling systems. LEM provides transducers for experiments that automatically measure and record important information about each subexperiment; these transducers can easily be extended to collect additional measurements specific to each experiment. Finally, experiment analysis is simplified by providing a general database visualization framework that allows users to quickly and easily interact with their measured data.

  6. Safe 15 Terawatt of Temelin NPP

    International Nuclear Information System (INIS)

    Sula, M.

    2010-01-01

    In this work author presents a project Safe 15 Terawatt realised on the Temelin NPP. This project is one of the eight key projects of the CEZ group, associated in the 'Programme of efficiency'. The project started in June 2007 with long-term goals for horizon of year 2012. The safety indicators will be reached of the first quarter level of world's nuclear power plant - by the end of the first decade. By the end of year 2012 we will have achieved annual production of 15 billion kWh - in the Czech Republic: 15 Terawatt.

  7. Preparation and planning for the replacement of the Oregon State University TRIGA reactor rotary specimen rack assembly

    International Nuclear Information System (INIS)

    Anderson, T.V.; Dodd, B.; Johnson, A.G.; Carpenter, W.T.

    1984-01-01

    Recently there have been a number of indications that the rotating rack may be approaching the end of its useful life. In order to benefit from the experience of other reactors who have removed and replaced their rotating racks, General Atomic (GA) was contacted and previous TRIGA Conference proceedings were scanned. It was determined that a number of facilities, had experienced difficulties with their lazy susans and eventually had to replace them. However, most of the written descriptions of this project were not sufficiently detailed to be of great use. The purpose of this paper is to identify some of the more important questions related to the replacement of our rotating rack assembly and OSU's currently proposed solutions, with a view towards soliciting ideas from other members of the TRIGA reactor community

  8. Experiences and attitudes towards end-of-life decisions amongst Danish physicians

    DEFF Research Database (Denmark)

    Folker, Anna Paldam; Holtug, Nils; Jensen, Annette B

    1996-01-01

    In this survey we have investigated the experiences and attitudes of Danish physicians regarding end-of-life decisions. Most respondents have made decisions that involve hastening the death of a patient, and almost all find it acceptable to do so. Such decisions are made more often, and considered...

  9. Dissecting the fuel element replacement machine in the NPP Muehlheim-Kaerlich using a wire saw

    International Nuclear Information System (INIS)

    Keller, Melanie; Ambos, Frank; Platt, Klaus

    2008-01-01

    By the end of 2000 the NPP Muehlheim-Kaerlich is decommissioned and has to be dismantled. The authors describe the demolition of the fuel element replacement machine. The work is aimed to declassify the waste without restraints for conventional disposal. Within 7 weeks the component has to be dissected using a wire saw. The authors describe the concept and its adaptation to the boundary conditions and experiences during the realization of the demolition concept.

  10. The patient's experience of temporary paralysis from spinal anaesthesia, a part of total knee replacement

    DEFF Research Database (Denmark)

    Bager, Louise; Konradsen, Hanne; Dreyer, Pia Sander

    2015-01-01

    AIMS AND OBJECTIVES: The aim of this study was to describe the meaning of being temporary paralysed from spinal anaesthesia when undergoing total knee replacement. BACKGROUND: Total knee arthroplasty is a common procedure, and regional anaesthesia is used as a method for anaesthetising the patient...... of the experience of spinal anaesthesia, as a part of having a total knee replacement. METHODS: Twelve patients were interviewed in March 2014 after undergoing an elective total knee arthroplasty under spinal anaesthesia. The interviews were analysed with a Ricoeur-inspired interpretation method. RESULTS: Three...... TO CLINICAL PRACTICE: The results of this study contribute to insights and deeper knowledge that can enhance staff's ability to provide care for patients undergoing total knee arthroplasty in spinal anaesthesia. The results provide perspectives that argue for care in accordance to individual needs....

  11. Continuous Renal Replacement Therapy Applications on Extracorporeal Membrane Oxygenation Circuit.

    Science.gov (United States)

    Yetimakman, Ayse Filiz; Tanyildiz, Murat; Kesici, Selman; Kockuzu, Esra; Bayrakci, Benan

    2017-06-01

    Continuous venovenous hemofiltration or hemodiafiltration is used frequently in pediatric patients, but experience of continuous renal replacement therapy (CRRT) application on extracorporeal membrane oxygenation (ECMO) circuit is still limited. Among several methods used for applying CRRT on ECMO patients, we aim to share our experience on inclusion of a CRRT device in the ECMO circuit which we believe is easier and safer to apply. The data were collected on demographics, outcomes, and details of the treatment of ECMO patients who had CRRT. During the study period of 3 years, venous cannula of ECMO circuit before pump was used for CRRT access for both the filter inlet and outlet of CRRT machine to minimize the thromboembolic complications. The common indication for CRRT was fluid overload. CRRT was used in 3.68% of a total number of patients admitted and 43% of patients on ECMO. The patients have undergone renal replacement therapy for periods of time ranging between 24 h and 25 days (260 h mean). The survival rate of this group of patients with multiorgan failure was 33%. Renal recovery occurred in all of the survivors. Complications such as electrolyte imbalance, hypothermia, and bradykinin syndrome were easily managed. Adding a CRRT device on ECMO circuit is a safe and effective technique. The major advantages of this technique are easy to access, applying CRRT without extra anticoagulation process, preventing potential hemodynamic disturbances, and increased clearance of solutes and fluid overload using larger hemofilter.

  12. Integrated vehicle's lateral safety: the LATERAL SAFE experience

    NARCIS (Netherlands)

    Amditis, A.; Floudas, N.; Kaiser-Dieckhoff, U.; Hackbarth, T.; Broek, S.P. van den; Miglietta, M.; Danielson, L.; Gemou, M.; Bekiaris, E.

    2008-01-01

    The applications developed and the evaluation results of the EU funded automotive safety PReVENT IP subproject LATERAL SAFE are described. The data synthesis algorithms that aim at achieving a reliable representation of the objects and their kinematics, in the lateral and rear fields of the host

  13. Designing safe and inclusive streets in India | CRDI - Centre de ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    17 nov. 2016 ... Safe streets play a crucial role in enabling livelihoods, mobility, and access to services. In fast-growing Indian cities such as Ahmedabad, streets are also the site of conflict. With incomes and vehicle ownership on the rise, traffic has replaced people as the central point of street design. Vehicle-focused street ...

  14. "Not a replacement": emotional experiences and practical consequences of Israeli second couplehood stepfamilies constructed in old age.

    Science.gov (United States)

    Koren, Chaya; Lipman-Schiby, Sharon

    2014-12-01

    The increase in life expectancy enhances phenomena such as second couplehood in old age following widowhood or divorce as an alternative way of coping with changes that occur with aging. Research on the phenomenon has focused mainly on individual and dyadic perspectives of the repartnered. The aim of this article was to explore repartnering from the stepfamily's perspective, which has scarcely been studied. Nineteen Israeli stepfamilies (38 multigenerational families) were recruited using criterion sampling, of men who repartnered at age 65+ and women at 60+, with children and grandchildren from a lifelong marriage that ended in widowhood or divorce. We audio-recorded and transcribed verbatim 107 semi-structured, qualitative interviews with older partners, their adult children, and grandchildren. Analysis was based on grounded theory and dyadic analysis principles adapted to families. It showed how repartnering in old age changed the family structure, constructing complex stepfamilies, which require further study. Emotional experiences refer to repartnering being a replacement for couplehood but not for parenthood/grandparenthood. Practical consequences refer to "knowing their place" within the stepfamily and included the following subthemes: showing affection; participating in memorials for the deceased spouse; sharing, listening, and assisting. Findings are discussed regarding life course and family life cycle perspectives. Copyright © 2014 Elsevier Inc. All rights reserved.

  15. Refurbishment and replacement efforts to mitigate ageing at Tarapur Atomic Power Station - an overview

    International Nuclear Information System (INIS)

    Katiyar, S.C.; Thattey, V.; Das, P.K.

    2006-01-01

    Tarapur Atomic Power Station (TAPS) - a twin Boiling Water Reactor unit and India's first Atomic Power Station was commissioned in April 1969, and was declared commercial in November 1969. Since then the light water moderated, low enriched uranium BWR with its demonstrated reliability and favourable economics is playing a vital role as a reliable source of power for the states of Maharashtra and Gujarat. The Power Station played a key role as a technology demonstrator validating the nuclear energy as safe and environmentally benign and economically viable alternate source of power generation in India. Built in the late sixties with state-of-the-art safety features prevailing then, TAPS has further evolved to be a safe plant with renovation and refurbishment efforts. Ageing Management Programme is in place at TAPS. Identification of systems, structures and components (SSCs) important to safety and availability, assessment of ageing degradation of these SSCs and mitigation through repair, replacement and refurbishment based on the investigations have enhanced the plant safety and reliability. The station's operating experience and feedback from BWRs operating abroad have also given inputs to Ageing Management Programme. A good number of major equipment have been replaced to mitigate ageing. Primary system piping, process heat exchangers, feed water heaters, turbine extraction system piping, turbine blades, emergency condenser tube bundles, various pumps, station batteries, electrical cables, circuit breakers etc. are some of them. Obsolescence is another aspect of ageing of a plant. Replacement of obsolete equipment and components particularly in C and I is another area where much headway has been made. Replacement and refurbishment of equipment have been done after detailed study and analysis so that current standards are met. Retrofitting the indigenously developed and fabricated equipment in a compact plant like TAPS was a difficult task and required lot of

  16. Commissioning Test of ATLAS End-Cap Toroidal Magnets

    CERN Document Server

    Dudarev, A; Foussat, A; Benoit, P; Jeckel, M; Olyunin, A; Kopeykin, N; Stepanov, V; Deront, L; Olesen, G; Ponts, X; Ravat, S; Sbrissa, K; Barth, J; Bremer, J; Delruelle, J; Metselaar, J; Pengo, R; Pirotte, O; Buskop, J; Baynham, D E; Carr, F S; Holtom, E

    2009-01-01

    The system of superconducting toroids in the ATLAS experiment at CERN consists of three magnets. The Barrel Toroid was assembled and successfully tested in 2006. Next, two End-Cap Toroids have been tested on surface at 77 K and installed in the cavern, 100-m underground. The End Cap Toroids are based on Al stabilized Nb-Ti/Cu Rutherford cables, arranged in double pancake coils and conduction cooled at 4.6 K. The nominal current is 20.5 kA at 4.1 T peak field in the windings and the stored energy is 250 MJ per toroid. Prior to final testing of the entire ATLAS Toroidal system, each End Cap Toroid passed a commissioning test up to 21 kA to guarantee a reliable performance in the final assembly. In this paper the test results are described. It includes the stages of test preparation, isolation vacuum pumping and leak testing, cooling down, step-by-step charging to full current, training quenches and quench recovery. By fast discharges the quench detection and protection system was checked to demonstrate a safe e...

  17. Isoeugenol is an important contact allergen: can it be safely replaced with isoeugenyl acetate?

    DEFF Research Database (Denmark)

    White, I R; Johansen, Jeanne Duus; Arnau, E G

    1999-01-01

    The prevalence of contact allergy to the fragrance mix in individuals with eczema is up to 10%. Within the mix, isoeugenol (CAS 97-54-1) is an important individual allergen. Until May 1998, the IFRA (International Fragrance Association) guidelines suggested that isoeugenol could safely be used at...

  18. Third-year Australian nursing students' attitudes, experiences, knowledge, and education concerning end-of-life care.

    Science.gov (United States)

    Adesina, Oluwatomilayo; DeBellis, Anita; Zannettino, Lana

    2014-08-01

    Nurses have a vital role in providing end-of-life care to patients and their families, and it is important that nursing students are adequately prepared for this role. This article reports on qualitative findings from research that explored a cohort of third-year undergraduate Australian nursing students' attitudes, experiences, knowledge, and education concerning end-of-life care. The study used open-ended questions in a purpose-designed, self-administered questionnaire and thematic analysis of the responses. Five themes emerged from the analysis: the importance of the students' values and beliefs, the influence of experience, their views on what constitutes a good or bad death, their knowledge of ethics and legislation surrounding end-of-life care, and how they perceived their level of education and knowledge. The need for more education on end-of-life care has implications for curriculum development in undergraduate nursing programmes, which need to provide graduating nurses with the necessary knowledge and skills to deliver quality care to patients who are dying and their families.

  19. Promise and deceit: pharmakos, drug replacement therapy, and the perils of experience.

    Science.gov (United States)

    Meyers, Todd

    2014-06-01

    The problem of lying as a feature of medication compliance has been well documented in anthropological and clinical literatures. Yet the role of the lie-its destabilizing effects on the continuity of drug treatment and therapy, as a technology of drug misuse, or as a way to understand the neuro-chemical processes of treatment (pharmacotherapy "tricking" or lying to the brain)-has been less considered, particularly in the context of opioid replacement therapy. The following paper is set against the backdrop of a three-year study of adolescents receiving a relatively new drug (buprenorphine) for the treatment of opiate dependency inside and outside of highly monitored treatment environments in the United States. Lies give order not only to the experience of addiction but also to the experience of therapy as well. In order to better understand this ordering of experience, the paper puts the widely discussed conceptual duality of the pharmakon (healing and poison) in conversation with a perilously overlooked subject in the critical study of pharmacotherapy, namely the pharmakos or the personification of sacrifice. The paper demonstrates how the patient-subject comes to represent therapeutic promise by allowing for the possibility of (and often performing) deceit.

  20. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  1. Experience with an end-of-life practice at a university hospital.

    Science.gov (United States)

    Campbell, M L; Frank, R R

    1997-01-01

    To describe a 10-yr experience with an end-of-life practice in a hospital. A nonexperimental, prospective, descriptive design was used to record variables from a convenience sample of patients transferred to the Comprehensive Supportive Care Team. Detroit Receiving Hospital is an urban, university-affiliated, Level I trauma/emergency hospital. Patients who are not expected to survive hospitalization, and for whom a decision has been made to focus care on palliative interventions, are candidates for care by this practice. None. Patient demographics, including the following information: age, gender; diagnoses; illness severity; mortality rate; and disposition. Measures of resource utilization included: referral sources; Therapeutic intervention Scoring System values; bed costs; and length of hospital stay. Satisfactory patient/family care with a measurable reeducation in the use of resources can be achieved in the hospital setting. A hands-on approach to the care of dying patients by this specialty, palliative care service has provided patients, families, and clinicians with the type of support needed for satisfactory end-of-life care. A summary of our experience may be useful to others.

  2. AB19. Testosterone replacement therapy: how safe is it?

    Science.gov (United States)

    Goldenberg, Larry

    2014-01-01

    controversies surrounding testosterone replacement therapy (TRT) have been addressed in the past few years. Although the androgenic effects of TRT on normal and malignant prostate cells have been studied for over 70 years, little clinical prospective research exists on the physiological responses of prostate tissues to a wide range of serum testosterone levels. The early, well-designed in vivo studies formed the basis of the concept that testosterone has a threshold or saturation level in all types of androgen-dependent prostate cells. That is, the stimulatory effects of androgens on the prostate reach a point within physiological serum levels above which they no longer have any proliferative effect and serum levels of testosterone and dihydrotestosterone can decrease substantially in both the eugonadal and hypogonadal states without affecting the amount of androgen within the nucleus of the cell. At a certain threshold level (possibly ‘castrate’ level), the intranuclear level of androgen will begin to decrease and the appropriate physiological changes will be triggered. Questions remain as to whether results from experimental studies in the rat can be extrapolated to the situation in humans. Is the human prostate subject to the same homeostatic constraints as has been so well defined in animal experiments, and if so, what is the threshold or saturation level for maximal intracellular androgens and physiological responses in man? The sensitivity of an individual to varying levels of testosterone is also influenced by his genetic makeup, particularly polymorphisms in the androgen receptor, and other upstream signaling and downstream metabolic events, including diabetes mellitus and obesity. Despite decades of research, no compelling evidence exists that increasing testosterone beyond this threshold level has a causative role in prostate cancer, or indeed changes the biology of the disease. Notwithstanding this, the reluctance to utilize testosterone replacement has been

  3. GPs and end of life decisions : views and experiences

    OpenAIRE

    Abela, Jurgen

    2015-01-01

    The views and experiences of GPs with respect to end of life (EoL) care are seldom addressed. The aim of this article is to better understand this aspect of care. A cross-sectional survey of all doctors in the country was designed and set up. The overall response was 396 (39.7%), 160 of which were GPs. 28.7% of GPs received no formal training in palliative medicine. 89.8% of respondents declared that their religion was important in EoL care. 45.3% agreed with the right of a patient to decide ...

  4. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy....... This review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes...... in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin...

  5. Targeted Regression of Hepatocellular Carcinoma by Cancer-Specific RNA Replacement through MicroRNA Regulation.

    Science.gov (United States)

    Kim, Juhyun; Won, Ranhui; Ban, Guyee; Ju, Mi Ha; Cho, Kyung Sook; Young Han, Sang; Jeong, Jin-Sook; Lee, Seong-Wook

    2015-07-20

    Hepatocellular carcinoma (HCC) has a high fatality rate and limited therapeutic options with side effects and low efficacy. Here, we proposed a new anti-HCC approach based on cancer-specific post-transcriptional targeting. To this end, trans-splicing ribozymes from Tetrahymena group I intron were developed, which can specifically induce therapeutic gene activity through HCC-specific replacement of telomerase reverse transcriptase (TERT) RNA. To circumvent side effects due to TERT expression in regenerating liver tissue, liver-specific microRNA-regulated ribozymes were constructed by incorporating complementary binding sites for the hepatocyte-selective microRNA-122a (miR-122a), which is down-regulated in HCC. The ribozyme activity in vivo was assessed in mouse models orthotopically implanted with HCC. Systemic administration of adenovirus encoding the developed ribozymes caused efficient anti-cancer effect and the least hepatotoxicity with regulation of ribozyme expression by miR-122a in both xenografted and syngeneic orthotopic murine model of multifocal HCC. Of note, the ribozyme induced local and systemic antitumor immunity, thereby completely suppressing secondary tumor challenge in the syngeneic mouse. The cancer specific trans-splicing ribozyme system, which mediates tissue-specific microRNA-regulated RNA replacement, provides a clinically relevant, safe, and efficient strategy for HCC treatment.

  6. Other people as means to a safe end: vicarious extinction blocks the return of learned fear.

    Science.gov (United States)

    Golkar, Armita; Selbing, Ida; Flygare, Oskar; Ohman, Arne; Olsson, Andreas

    2013-11-01

    Information about what is dangerous and safe in the environment is often transferred from other individuals through social forms of learning, such as observation. Past research has focused on the observational, or vicarious, acquisition of fears, but little is known about how social information can promote safety learning. To address this issue, we studied the effects of vicarious-extinction learning on the recovery of conditioned fear. Compared with a standard extinction procedure, vicarious extinction promoted better extinction and effectively blocked the return of previously learned fear. We confirmed that these effects could not be attributed to the presence of a learning model per se but were specifically driven by the model's experience of safety. Our results confirm that vicarious and direct emotional learning share important characteristics but that social-safety information promotes superior down-regulation of learned fear. These findings have implications for emotional learning, social-affective processes, and clinical practice.

  7. The experience of providing end-of-life care to a relative with advanced dementia: an integrative literature review.

    Science.gov (United States)

    Peacock, Shelley C

    2013-04-01

    The number of people with dementia is growing at an alarming rate. An abundance of research over the past two decades has examined the complex aspects of caring for a relative with dementia. However, far less research has been conducted specific to the experiences of family caregivers providing end-of-life care, which is perplexing, as dementia is a terminal illness. This article presents what is known and highlights the gaps in the literature relevant to the experiences of family caregivers of persons with dementia at the end of life. A thorough search of the Cumulative Index to Nursing and Allied Health Literature (CINAHL) and PubMed databases from 1960 to 2011 was conducted. Ten studies were identified that specifically addressed the experience of family caregivers providing end-of-life care to a relative with advanced dementia. Common themes of these studies included: 1) the experience of grief, 2) guilt and burden with decision making, 3) how symptoms of depression may or may not be resolved with death of the care receiver, 4) how caregivers respond to the end-stage of dementia, and 5) expressed needs of family caregivers. It is evident from this literature review that much remains to be done to conceptualize the experience of end-of-life caregiving in dementia.

  8. Postural and Object-Oriented Experiences Advance Early Reaching, Object Exploration, and Means-End Behavior

    Science.gov (United States)

    Lobo, Michele A.; Galloway, James C.

    2008-01-01

    The effects of 3 weeks of social (control), postural, or object-oriented experiences on 9- to 21-week-old infants' (N = 42) reaching, exploration, and means-end behaviors were assessed. Coders recorded object contacts, mouthing, fingering, attention, and affect from video. Postural and object-oriented experiences advanced reaching, haptic…

  9. Effect of sodium butyrate supplementation in milk replacer and starter diet on rumen development in calves

    DEFF Research Database (Denmark)

    Gorka, P; Kowalski, Z M; Pietrzak, P

    2009-01-01

    the effect of sodium butyrate (NaB) supplementation in milk replacer and starter diet on rumen development in rearing calves. Fourteen bull calves (5-day-old) were randomly allocated to two groups: Control (C) and NaB. The later received 0.3 % NaB in milk replacer and starter diet. Animals were in experiment...... up to age of 26 days. Addition of NaB to milk replacer and starter diet had no effect on daily growth rate, but reduced the weight loss observed in C calves in first 11 days of age. Additionally, the NaB calves weighed more at the end of the study and tended to have higher growth rate in the whole......, and no change in muscle layer thickness, as compared to control. Plasma glucagon-like peptide-2 relative increase was higher in NaB group than in C group, and may be involved in rumen development. In conclusion, supplementation of the diet (milk replacer and starter diet) with NaB may enhance rumen development...

  10. CUSTOM TRIFLANGE ACETABULAR COMPONENTS IN REVISION HIP REPLACEMENT (EXPERIENCE REVIEW

    Directory of Open Access Journals (Sweden)

    A. A. Korytkin

    2017-01-01

    Full Text Available Extensive defects of acetabulum especially accompanied by pelvis discontinuity at the level of acetabulum pose a serious challenge in revision hip replacement and create additional complexity in fixing the acetabular component. One of the perspective options to solve the above issue is the use of custom triflange acetabular components (CTAC designed based on preoperative computer tomography given the specifics of bone defects of the patient. Purpose of the study — to evaluate the outcomes of CTAC use in revision hip replacement.Materials and methods. The authors analyzed treatment outcomes of 12 patients after revision hip replacement using additive techniques of computer simulation and 3D printing CTAC. Follow up period after the surgery averaged 7±3 months (from one to ten months. 7 out of 12 patients had acetabular defects of Paprosky 3B type, 4 patients had defects of Paprosky 3A and in one patient — of Paprosky 2C.Results. Two out of twelve patients had prosthesis dislocations that required revision hip surgery, one of those patients underwent open reduction of dislocation with wound debridement, another patient underwent replacement of articulating couple of acetabular component. Total scores under Harris Hip Score and paint VAS score prior to treatment was 28±7 and 7±1 points respectively, postoperative scores were 76±9 and 3±1 respectively.Conclusion. The application of additive techniques for revision hip replacement in patients with extensive acetabular and pelvic defects allows to make a precise preoperative planning, to restore joint rotation center, to reconstruct bone defects and to securely fix triflange acetabular component that altogether significantly improve treatment outcomes and patients satisfaction with the surgery.

  11. THE ROLE OF TEENAGEERS’ LIFE EXPERIENCE ACTUALIZATION IN THE FRAMEWORK OF THE SAFE SOCIAL ENVIRONMENT FORMATION

    Directory of Open Access Journals (Sweden)

    O. A. Selivanov

    2013-01-01

    Full Text Available The paper looks at the problem of social security and emphasizes the urgent need for developing the general theory of social security, its concepts and models designed to meet the requirements of time and specify different aspects and levels of socialization process – federal, regional and municipal. The author regards actualization of teenagers’ life experience as a promising direction for exploring the opportunities for creating the safe social environment.The individual socio-psychological functioning is delineated as a multilevel correlation of internal and external human resources used for resolving difficult situations. According to the author, the prompt mobilization of internal resources of a teenager, training the ability to apply the external resources for solving the problem and developing the safe behavior can improve the quality of life in the modern society. Along with the risks of modern information society, the author emphasizes a number of dangerous social trends: disruption of social institutions, ifantilization of education, distortion of historical cultural channels, and devaluation of the collectivism idea.In author’s opinion, teenagers should get some special knowledge and individual training to develop the skills of safe behavior in actual situations; and the prospects of the modern society considerably depend on the above procedures. 

  12. Testing of CFC replacement fluids for arc-induced toxic by-products

    Energy Technology Data Exchange (ETDEWEB)

    Cravey, W.R.; Goerz, D.A.; Hawley-Fedder, R.A.

    1993-06-01

    The authors have developed a unique test-stand for quantifying the generation of perfluoroisobutylene (PFIB) in chlorofluorocarbon (CFC) replacement fluids when they are subjected to high electrical stress/breakdown environments. PFIB is an extremely toxic gas with a threshold limit value of 10 ppbv as set by the American Conference of Governmental Industrial Hygienists. They have tested several new fluids from various manufacturers for their potential to generate PFIB. Their goal is to determine breakdown characteristics and quantify toxic by-products of these replacement fluids to determine a safe, usable alternative for present CFC`s.

  13. Hierarchical Control of the ATLAS Experiment

    CERN Document Server

    Barriuso-Poy, Alex; Llobet-Valero, E

    2007-01-01

    Control systems at High Energy Physics (HEP) experiments are becoming increasingly complex mainly due to the size, complexity and data volume associated to the front-end instrumentation. In particular, this becomes visible for the ATLAS experiment at the LHC accelerator at CERN. ATLAS will be the largest particle detector ever built, result of an international collaboration of more than 150 institutes. The experiment is composed of 9 different specialized sub-detectors that perform different tasks and have different requirements for operation. The system in charge of the safe and coherent operation of the whole experiment is called Detector Control System (DCS). This thesis presents the integration of the ATLAS DCS into a global control tree following the natural segmentation of the experiment into sub-detectors and smaller sub-systems. The integration of the many different systems composing the DCS includes issues such as: back-end organization, process model identification, fault detection, synchronization ...

  14. Investment, replacement and scrapping in a vintage capital model with embodied technological change

    OpenAIRE

    Bitros, George C.; Hritonenko, Natali; Yatsenko, Yuri

    2007-01-01

    This paper analyzes and compares two alternative policies of determining the service life and replacement demand for vintage equipment under embodied technological change. The policies are the infinite-horizon replacement and the transitory replacement ending with scrapping. The corresponding vintage capital models are formulated in the dynamic optimization framework. These two approaches lead to different estimates of the duration of replacements and the impact of technological change on the...

  15. Playing it safe: Patron safety strategies and experience of violence in night-time entertainment districts.

    Science.gov (United States)

    Zhou, Jin; Droste, Nicolas; Curtis, Ashlee; Zinkiewicz, Lucy; Miller, Peter

    2018-03-01

    Incidences of violence are elevated in night-time entertainment districts. Research suggests that safety-related behavioural strategies adopted while drinking can reduce negative alcohol-related outcomes. The current study investigates the use of safety strategies and its association with experiences of violence among patrons from the general population. Patron interviews (N = 3949) were conducted in and around licenced venues in Newcastle (New South Wales) and Geelong (Victoria) during peak trading hours (Friday and Saturday, 21:00-01:00 h). Participants (mean age = 24.3, SD = 5.8; male 54.4%) were asked to report what measures, if any, they used to keep safe when drinking and whether they had been involved in a violent incident in the last 12 months. After controlling for patron demographics and location, the use of multiple (more than one) safety strategies was significantly associated with reduced odds of involvement in a violent incident (odds ratio = 0.64, 95% confidence interval 0.49-0.85, P = 0.002). Significant gender differences were observed in the number and type of safety strategies reported. Increasing the number of safety-related behaviours during drinking occasions is associated with a small but significant reduction in experiencing alcohol-related harms, such as violence. [Zhou J, Droste N, Curtis A, Zinkiewicz L, Miller P. Playing it safe: Patron safety strategies and experience of violence in night-time entertainment districts. © 2017 Australasian Professional Society on Alcohol and other Drugs.

  16. Key issues surrounding the health impacts of electronic nicotine delivery systems (ENDS) and other sources of nicotine.

    Science.gov (United States)

    Drope, Jeffrey; Cahn, Zachary; Kennedy, Rosemary; Liber, Alex C; Stoklosa, Michal; Henson, Rosemarie; Douglas, Clifford E; Drope, Jacqui

    2017-11-01

    Answer questions and earn CME/CNE Over the last decade, the use of electronic nicotine delivery systems (ENDS), including the electronic cigarette or e-cigarette, has grown rapidly. More youth now use ENDS than any tobacco product. This extensive research review shows that there are scientifically sound, sometimes competing arguments about ENDS that are not immediately and/or completely resolvable. However, the preponderance of the scientific evidence to date suggests that current-generation ENDS products are demonstrably less harmful than combustible tobacco products such as conventional cigarettes in several key ways, including by generating far lower levels of carcinogens and other toxic compounds than combustible products or those that contain tobacco. To place ENDS in context, the authors begin by reviewing the trends in use of major nicotine-containing products. Because nicotine is the common core-and highly addictive-constituent across all tobacco products, its toxicology is examined. With its long history as the only nicotine product widely accepted as being relatively safe, nicotine-replacement therapy (NRT) is also examined. A section is also included that examines snus, the most debated potential harm-reduction product before ENDS. Between discussions of NRT and snus, ENDS are extensively examined: what they are, knowledge about their level of "harm," their relationship to smoking cessation, the so-called gateway effect, and dual use/poly-use. CA Cancer J Clin 2017;67:449-471. © 2017 American Cancer Society. © 2017 American Cancer Society.

  17. Population dynamics of the species Plantago major L. and Poa annua L. in a replacement series experiment

    Directory of Open Access Journals (Sweden)

    Mijović A.

    2009-01-01

    Full Text Available Population dynamics of the species Plantago major L. and Poa annua L., typical representatives of ruderal vegetation, was analyzed in a replacement series experiment. The analyzed species were sown in an area with meadow vegetation, where the vegetation present had been previously removed by a total herbicide and additionally by hoeing. The objective of the experiment was to monitor growth dynamics and the effect of intra- and inter-specific interaction of the species Plantago major and Poa annua in conditions of different sowing densities and proportions. The effects of intra- and inter-specific interference and the density-dependent responses were assessed on the basis of several parameters (natality, mortality, age structure, and measures of ontogenetic changes. Based on the study results, it can be concluded that the responses of the species in the experiment were different, which is explained by different adaptive mechanisms, i.e., strategies, in the specific environmental conditions. An effect of the density dependent response was present in both species in the replacement series experiment. The response was amplified by water deficit caused by intensive evapora­tion of the bare soil. No effect of inter-specific interference was observed at the given densities of the study species on the sample plots. An effect of intra-specific interference of the species Plantago major and Poa annua was observed in the guise of a density-negative response of the rate of ontogenetic changes and fecundity.

  18. Pyrochemical head-end treatment for spent nuclear fuels

    International Nuclear Information System (INIS)

    Bowersox, D.F.

    1977-01-01

    A program based upon thermodynamic values and scouting experiments at Argonne National Laboratory is proposed for development of a pyrochemical head-end treatment of spent nuclear fuels to replace the proposed chopping and leaching operation in the Purex process. The treatment consists of separation of the cladding from the oxide fuel by dissolution into liquid zinc; oxide reduction of uranium and plutonium and dissolution into a zinc--magnesium alloy; separation of alkali, alkaline earth, and rare earth fission products into a molten salt; and, finally, separation and recovery of the plutonium and uranium in the alloy. Uranium and plutonium would be separated from the fuel cladding and selected fission products in a form readily dissolvable in nitric acid. The head-end process could be developed eventually into an optimum method for recovering uranium, plutonium, and selected fission products and for minimizing wastes as compact, stable solids. Developmental expenses are not known clearly, but the potential advantages of the process are impressive

  19. Rural end-of-life care from the experiences and perspectives of patients and family caregivers: A systematic literature review.

    Science.gov (United States)

    Rainsford, Suzanne; MacLeod, Roderick D; Glasgow, Nicholas J; Phillips, Christine B; Wiles, Robert B; Wilson, Donna M

    2017-12-01

    End-of-life care must be relevant to the dying person and their family caregiver regardless of where they live. Rural areas are distinct and need special consideration. Gaining end-of-life care experiences and perspectives of rural patients and their family caregivers is needed to ensure optimal rural care. To describe end-of-life care experiences and perspectives of rural patients and their family caregivers, to identify facilitators and barriers to receiving end-of-life care in rural/remote settings and to describe the influence of rural place and culture on end-of-life care experiences. A systematic literature review utilising the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines. Four databases (PubMed, CINAHL, Scopus and Web of Science) were searched in January 2016, using a date filter of January 2006 through January 2016; handsearching of included article references and six relevant journals; one author contacted; pre-defined search terms and inclusion criteria; and quality assessment by at least two authors. A total of 27 articles (22 rural/remote studies) from developed and developing countries were included, reporting rural end-of-life care experiences and perspectives of patients and family caregivers. Greatest needs were informational (developed countries) and medications (developing countries). Influence of rural location included distances, inaccessibility to end-of-life care services, strong community support and importance of home and 'country'. Articulation of the rural voice is increasing; however, there still remain limited published rural studies reporting on patient and family caregivers' experiences and perspectives on rural end-of-life care. Further research is encouraged, especially through national and international collaborative work.

  20. A 'simple anterior fish excluder' (SAFE for mitigating penaeid-trawl bycatch.

    Directory of Open Access Journals (Sweden)

    Matthew J McHugh

    Full Text Available Various plastic strips and sheets (termed 'simple anterior fish excluders'-SAFEs were positioned across the openings of penaeid trawls in attempts at reducing the unwanted bycatches of small teleosts. Initially, three SAFEs (a single wire without, and with small and large plastic panels were compared against a control (no SAFE on paired beam trawls. All SAFEs maintained targeted Metapenaeus macleayi catches, while the largest plastic SAFE significantly reduced total bycatch by 51% and the numbers of Pomatomus saltatrix, Mugil cephalus and Herklotsichthys castelnaui by up to 58%. A redesigned SAFE ('continuous plastic' was subsequently tested (against a control on paired otter trawls, significantly reducing total bycatch by 28% and P. saltatrix and H. castelnaui by up to 42%. The continuous-plastic SAFE also significantly reduced M. macleayi catches by ~7%, but this was explained by ~5% less wing-end spread, and could be simply negated through otter-board refinement. Further work is required to refine the tested SAFEs, and to quantify species-specific escape mechanisms. Nevertheless, the SAFE concept might represent an effective approach for improving penaeid-trawl selectivity.

  1. End-of-life expectations and experiences among nursing home patients and their relatives

    DEFF Research Database (Denmark)

    Fosse, Anette; Schaufel, Margrethe Aase; Ruths, Sabine

    2014-01-01

    . CONCLUSION: Nursing home patients and their relatives wanted doctors more involved in end-of-life care. They expected doctors to acknowledge their preferences and provide guidance and symptom relief. PRACTICE IMPLICATIONS: High-quality end-of-life care in nursing homes relies on organization, funding......OBJECTIVE: Synthesize research about patients' and relatives' expectations and experiences on how doctors can improve end-of-life care in nursing homes. METHODS: We systematically searched qualitative studies in English in seven databases (Medline, Embase, PsycINFO, CINAHL, Ageline, Cochrane...... decision-makers reported uncertainty and distress when guidance from health personnel was lacking. They worried about staff shortage and emphasized doctor availability. Relatives and health personnel seldom recognized patients' ability to consent, and patients' preferences were not always recognized...

  2. The experience of the Republic of Belarus in the field of safe and secure transport of radioactive material

    International Nuclear Information System (INIS)

    Astashka, R.; Kronava, Z.; Prykhodzka, A.; Tkachonak, I.

    2016-01-01

    The experience of the safe and secure transport of radioactive material of the Republic of Belarus includes domestic and international movements. Transit is a substantial part of international movements taking into account the location of the country. Legislative and regulatory requirements on safety and security of radioactive material transport being in force in the country include the demands making by such state structures as the Department on Nuclear and Radiation Safety, the Department on supervision for the safe industrial activities, the Ministry of Health of the Republic of Belarus. At the same time response to accidents and security events belongs to the scope of activity of special subdivisions of the Ministry for Emergency Situations and the Ministry of Internal Affairs of the Republic of Belarus. For safety purposes all the above-mentioned structures are executing their duties in close collaboration with each other and are following the IAEA safety and security recommendations. The regulatory infrastructure concerning the safe and secure transport of radioactive material of the Republic of Belarus is the subject of the contributed paper. (author)

  3. Periodic Peritoneal Dialysis in End Stage Renal Disease: Is it Still ...

    African Journals Online (AJOL)

    peritoneal dialysis (PD) in India has made renal replacement therapy out of reach of many patients with ... Keywords: Peritoneal dialysis, End stage renal disease, Renal replacement therapy ..... adherence to the dialysis program is often poor.

  4. Development of remote replacement system for armor tiles of first wall of FER

    International Nuclear Information System (INIS)

    Adachi, Junichi; Yoshizawa, Shunji; Nakano, Yasuo; Kuboyama, Takashi; Shibanuma, Kiyoshi; Kakudate, Satoshi; Oka, Kiyoshi.

    1993-01-01

    A remote system has been developed to replace automatically armor tiles of first walls with a single manipulator arm for the Fusion Experimental Reactor (FER). The system is composed of a manipulator arm and an end-effector (a tile replacement hand), which have a gripper of the tiles, a nutrunner to rotate attatching bolts of them and a vision sensor to measure positions of them. The system can replace the tiles by means of a visual feedback system using vision sensor, even if the positions of the tiles would have changed. As a result of tests, it has been proved that the end-effector is useful and the control system is practicable. (author)

  5. Midterm Results of Aortic Valve Replacement with Cryopreserved Homografts

    Directory of Open Access Journals (Sweden)

    Emre Özker

    2012-06-01

    Full Text Available Objective: The aim of this study was to analyze the midterm clinical results of aortic valve replacement with cryopreserved homografts.Materials and Methods: Aortic valve replacement was performed in 40 patients with cryopreserved homograft. The indications were aortic valve endocarditis in 20 patients (50%, truncus arteriosus in 6 patients (15%, and re-stenosis or regurtitation after aortic valve reconstruction in 14 (35% patients. The valve sizes ranged from 10 to 27mm. A full root replacement technique was used for homograft replacement in all patients.Results: The 30-day postoperative mortality rate was 12.5% (5 patients. There were four late deaths. Only one of them was related to cardiac events. Overall mortality was 22.5%. Thirty-three patients were followed up for 67±26 months. Two patients needed reoperation due to aortic aneurysm caused by endocarditis. The mean transvalvular gradient significantly decreased after valve replacement (p<0.003. The last follow up showed that the 27 (82% patients had a normal left ventricular function.Conclusion: Cryopreserved homografts are safe alternatives to mechanical valves that can be used when there are proper indications. Although it has a high perioperative mortality rate, cryopreserved homograft implantation is an alternative for valve replacement, particularly in younger patients and for complex surgical problems such as endocarditis that must be minimalized.

  6. Communication as care at end of life: an emerging issue from an exploratory action research study of renal end-of-life care for ethnic minorities in the UK.

    Science.gov (United States)

    Wilkinson, Emma; Randhawa, Gurch; Brown, Edwina A; Da Silva Gane, Maria; Stoves, John; Warwick, Graham; Akhtar, Tahira; Magee, Regina; Sharman, Sue; Farrington, Ken

    2014-09-01

    South Asian people have a higher risk of developing kidney disease, are disproportionately represented in the patient population requiring renal replacement therapy and wait longer to receive a kidney transplant, compared with white Europeans. As a result, there is a demand for end-of-life care, which meets the needs of this group of patients. Providing end-of-life care to patients from different cultures is a challenge for renal services as there can be barriers to communication in the form of language, delegated decision-making within families and reluctance to discuss death. To explore end-of-life care for South Asians with kidney disease, 16 interviews with patients and 14 focus groups with care providers were conducted at four research sites in the UK with large South Asian populations. Using an action research design the data were analysed thematically and fed back to inform the research in a cyclical manner. If patients are not fully aware of their condition or of what end-of-life care is, it is less likely that they will be able to be involved in decision-making about their care and this is compounded where there are communication barriers. Variations in care provider awareness and experience of providing end-of-life care to South Asian patients, in turn, contributes to lack of patient awareness of end-of-life care. Communication as care at the end of life should be explored further. Researching the South Asian patient experience of end of life highlights many relevant and generalisable issues. © 2014 European Dialysis and Transplant Nurses Association/European Renal Care Association.

  7. Integrated vehicle’s lateral safety: the LATERAL SAFE experience

    NARCIS (Netherlands)

    Amditis, A.; Floudas, N.; Kaiser-Dieckhoff, U.; Hackbarth, T.; Broek, S.P. van den; Miglietta, M.; Danielson, L.; Gemou, M.; Bekiaris, E.

    2008-01-01

    The applications developed and the evaluation results of the EU funded automotive safety PReVENT IP subproject LATERAL SAFE are described. The data synthesis algorithms that aim at achieving a reliable representation of the objects and their kinematics, in the lateral and rear fields of the host

  8. Exploring the changing multidimensional experiences of frail older people towards the end of life: a narrative study

    OpenAIRE

    Lloyd, Anna Elizabeth

    2015-01-01

    Background Palliative care services have widened beyond cancer in recent years, yet frail older adults rarely receive such services. There is a need to understand the dynamic multidimensional end-of-life experiences of this group in order to assess how or if a palliative approach could be beneficial. Physical end-of-life trajectories for frail older people have been described but there remains little person centred research that describes changing experiences across physical...

  9. Replacing Phosphorus-Containing Food Additives With Foods Without Additives Reduces Phosphatemia in End-Stage Renal Disease Patients: A Randomized Clinical Trial.

    Science.gov (United States)

    de Fornasari, Margareth Lage Leite; Dos Santos Sens, Yvoty Alves

    2017-03-01

    The purpose of the study was to verify the effects of replacing phosphorus-containing food additives with foods without additives on phosphatemia in end-stage renal disease (ESRD) patients. Randomized clinical trial. Adult patients on hemodialysis for ≥6 months at a single center. A total of 134 patients with phosphorus levels of >5.5 mg/dL were included and were randomized into an intervention group (n = 67) and a control group (n = 67). The IG received individual orientation to replace processed foods that have phosphorus additives with foods of similar nutritional value without these additives. The CG received only the nutritional orientation given before the study. Clinical laboratory data, nutritional status, energy and protein intake, and normalized protein nitrogen appearance (nPNA) were evaluated at the beginning of the study and after 90 days. There was no initial difference between the groups in terms of serum phosphorus levels, nutritional status, and energy intake. After 3 months, there was a decline in phosphorus levels in the IG (from 7.2 ± 1.4 to 5.0 ± 1.3 mg/dL, P food additives with foods without additives reduced serum phosphorus without interfering in the nutritional status of ESRD patients. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  10. Experience of using MOSFET detectors for dose verification measurements in an end-to-end 192Ir brachytherapy quality assurance system.

    Science.gov (United States)

    Persson, Maria; Nilsson, Josef; Carlsson Tedgren, Åsa

    Establishment of an end-to-end system for the brachytherapy (BT) dosimetric chain could be valuable in clinical quality assurance. Here, the development of such a system using MOSFET (metal oxide semiconductor field effect transistor) detectors and experience gained during 2 years of use are reported with focus on the performance of the MOSFET detectors. A bolus phantom was constructed with two implants, mimicking prostate and head & neck treatments, using steel needles and plastic catheters to guide the 192 Ir source and house the MOSFET detectors. The phantom was taken through the BT treatment chain from image acquisition to dose evaluation. During the 2-year evaluation-period, delivered doses were verified a total of 56 times using MOSFET detectors which had been calibrated in an external 60 Co beam. An initial experimental investigation on beam quality differences between 192 Ir and 60 Co is reported. The standard deviation in repeated MOSFET measurements was below 3% in the six measurement points with dose levels above 2 Gy. MOSFET measurements overestimated treatment planning system doses by 2-7%. Distance-dependent experimental beam quality correction factors derived in a phantom of similar size as that used for end-to-end tests applied on a time-resolved measurement improved the agreement. MOSFET detectors provide values stable over time and function well for use as detectors for end-to-end quality assurance purposes in 192 Ir BT. Beam quality correction factors should address not only distance from source but also phantom dimensions. Copyright © 2017 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  11. New piezo driven gas inlet valve for fusion experiments

    International Nuclear Information System (INIS)

    Usselmann, E.; Hemmerich, J.L.; How, J.; Holland, D.; Orchard, J.; Winkel, T.; Schargitz, U.; Pocheim, N.

    1989-01-01

    The gas inlet valves used at the JET experiment are described and their performances are discussed. A new gas-valve development suitable to replace the existing valves at JET and for future use in large fusion experiments is presented. The new valve is equipped with a piezo-electric translator and has a dosing range of 0-800 mbarls -1 for D 2 . The operating mode of the valve is fail-safe closed with a leak-rate of ≤ 10 -9 mbarls -1 . The design, the test results and throughput values in dependence of filling pressure and control voltage are presented and experiences with the prototype valve as a new gas inlet valve for the JET operation are described

  12. VME as a front-end electronics system in high energy physics experiments

    International Nuclear Information System (INIS)

    Ohska, T.K.

    1990-01-01

    It is only a few years since the VME became a standard system, yet the VME system is already so much more popular than other systems. The VME system was developed for industrial applications and not for the scientific research, and high energy physics field is a tiny market when compared with the industrial market. Considerations made here indicate that the VME system would be a good one for a rear-end system, but would not be a good candidate for front-end electronics in physics experiments. Furthermore, there is a fear that the VXI bus could become popular in this field of instrumentation since the VXI system is backed up by major suppliers of instrumentation in the high energy physics field. VXI would not be an adequate system for front-end electronics, yet advertised to be one. It would be worse to see the VXI system to become a standard system for high energy physics instrumentation than the VME system to be one. The VXI system would do a mediocre job so that people might be misled to think that the VXI system can be used as front-end system. (N.K.)

  13. Discussing End-of-Life Decisions in a Clinical Ethics Committee: An Interview Study of Norwegian Doctors' Experience.

    Science.gov (United States)

    Bahus, Marianne K; Førde, Reidun

    2016-09-01

    With disagreement, doubts, or ambiguous grounds in end-of-life decisions, doctors are advised to involve a clinical ethics committee (CEC). However, little has been published on doctors' experiences with discussing an end-of-life decision in a CEC. As part of the quality assurance of this work, we wanted to find out if clinicians have benefited from discussing end-of-life decisions in CECs and why. We will disseminate some Norwegian doctors' experiences when discussing end-of-life decisions in CECs, based on semi-structured interviews with fifteen Norwegian physicians who had brought an end-of-life decision case to a CEC. Almost half of the cases involved conflicts with the patients' relatives. In a majority of the cases, there was uncertainty about what would be the ethically preferable solution. Reasons for referring the case to the CEC were to get broader illumination of the case, to get perspective from people outside the team, to get advice, or to get moral backing on a decision already made. A great majority of the clinicians reported an overall positive experience with the CECs' discussions. In cases where there was conflict, the clinicians reported less satisfaction with the CECs' discussions. The study shows that most doctors who have used a CEC in an end-of-life decision find it useful to have ethical and/or legal aspects illuminated, and to have the dilemma scrutinized from a new perspective. A systematic discussion seems to be significant to the clinicians.

  14. A Safe Protocol for Amalgam Removal

    Directory of Open Access Journals (Sweden)

    Dana G. Colson

    2012-01-01

    Full Text Available Today's environment has different impacts on our body than previous generations. Heavy metals are a growing concern in medicine. Doctors and individuals request the removal of their amalgam (silver mercury restorations due to the high mercury content. A safe protocol to replace the silver mercury filling will ensure that there is minimal if any absorption of materials while being removed. Strong alternative white composite and lab-processed materials are available today to create a healthy and functioning mouth. Preparation of the patient prior to the procedure and after treatment is vital to establish the excretion of the mercury from the body.

  15. Back-end and interface implementation of the STS-XYTER2 prototype ASIC for the CBM experiment

    International Nuclear Information System (INIS)

    Kasinski, K.; Szczygiel, R.; Zabolotny, W.

    2016-01-01

    Each front-end readout ASIC for the High-Energy Physics experiments requires robust and effective hit data streaming and control mechanism. A new STS-XYTER2 full-size prototype chip for the Silicon Tracking System and Muon Chamber detectors in the Compressed Baryonic Matter experiment at Facility for Antiproton and Ion Research (FAIR, Germany) is a 128-channel time and amplitude measuring solution for silicon microstrip and gas detectors. It operates at 250 kHit/s/channel hit rate, each hit producing 27 bits of information (5-bit amplitude, 14-bit timestamp, position and diagnostics data). The chip back-end implements fast front-end channel read-out, timestamp-wise hit sorting, and data streaming via a scalable interface implementing the dedicated protocol (STS-HCTSP) for chip control and hit transfer with data bandwidth from 9.7 MHit/s up to 47 MHit/s. It also includes multiple options for link diagnostics, failure detection, and throttling features. The back-end is designed to operate with the data acquisition architecture based on the CERN GBTx transceivers. This paper presents the details of the back-end and interface design and its implementation in the UMC 180 nm CMOS process.

  16. Implementation of Safe-by-Design for Nanomaterial Development and Safe Innovation: Why We Need a Comprehensive Approach.

    Science.gov (United States)

    Kraegeloh, Annette; Suarez-Merino, Blanca; Sluijters, Teun; Micheletti, Christian

    2018-04-14

    Manufactured nanomaterials (MNMs) are regarded as key components of innovations in various fields with high potential impact (e.g., energy generation and storage, electronics, photonics, diagnostics, theranostics, or drug delivery agents). Widespread use of MNMs raises concerns about their safety for humans and the environment, possibly limiting the impact of the nanotechnology-based innovation. The development of safe MNMs and nanoproducts has to result in a safe as well as functional material or product. Its safe use, and disposal at the end of its life cycle must be taken into account too. However, not all MNMs are similarly useful for all applications, some might bear a higher hazard potential than others, and use scenarios could lead to different exposure probabilities. To improve both safety and efficacy of nanotechnology, we think that a new proactive approach is necessary, based on pre-regulatory safety assessment and dialogue between stakeholders. On the basis of the work carried out in different European Union (EU) initiatives, developing and integrating MNMs Safe-by-Design and Trusted Environments (NANoREG, ProSafe, and NanoReg2), we present our point of view here. This concept, when fully developed, will allow for cost effective industrial innovation, and an exchange of key information between regulators and innovators. Regulators are thus informed about incoming innovations in good time, supporting a proactive regulatory action. The final goal is to contribute to the nanotechnology governance, having faster, cheaper, effective, and safer nano-products on the market.

  17. Seismic Performances of Replaceable Steel Connection with Low Yield Point Metal

    Directory of Open Access Journals (Sweden)

    Haoxiang He

    2015-01-01

    Full Text Available Compared with the traditional steel rigid connection, the beam-column connections with weakened beam end have better ductility, but the local buckling in the weakened zone and the overall lateral deformation may occur in strong earthquake. The replaceable steel connection with low yield point metal is proposed based on the concept of earthquake resilient structure. In this connection, the weakened parts in the flange slab and web plate are filled with low yield point metal, and the metal firstly yields and dissipates energy sufficiently in earthquake; hence, the main parts are intact and the yield point metal can be replaced. The seismic performances of the three types of connections which include traditional connection, beam end weakened connection, and replaceable connection with low yield point steel under low cycle reciprocating load are studied. In addition, the energy dissipation capacity and damage characteristics of different connections are compared. The multiscale finite element models for the steel frames with different connections are analyzed by time-history method; both the computational efficiency and the accuracy are assured. The analysis results approve that the replaceable connection can confine the major damage in the replacement material and have better energy dissipation ability, safety reserves, and resilient ability.

  18. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  19. 'Your whole life is lived through your teeth': biographical disruption and experiences of tooth loss and replacement.

    Science.gov (United States)

    Rousseau, Nikki; Steele, Jimmy; May, Carl; Exley, Catherine

    2014-03-01

    The experience and meaning of tooth loss and replacement has varied historically and culturally but has received relatively little attention from social scientists. Our study set out to understand these experiences in the context of the arrival of newer, dental implant treatments. Semi-structured qualitative interviews were carried out with 39 men and women who had experienced tooth loss and replacement. A thematic analysis was sensitised by previous sociological work on chronic illness, particularly Bury's notion of biographical disruption. We found that while for some individuals the loss of a tooth was relatively insignificant, for others it was devastating and disruptive. In seeking to understand this difference, the concept of biographical disruption was a helpful analytical tool. Our analysis identified two forms of disruption. The first related to the meanings of tooth loss (the neglected mouth) and denture wearing (a marker of old age). The second, embodied, disruption concerned the relationship between the self and mouth in those wearing dentures (the invaded, unreliable mouth) and could occur even where tooth loss and denture wearing had been biographically anticipated. © 2013 The Authors. Sociology of Health & Illness © 2013 Foundation for the Sociology of Health & Illness/John Wiley & Sons Ltd.

  20. [Valve-sparing Replacement in Patients with Aortic Root Dilatation].

    Science.gov (United States)

    Yamazaki, Kazuhiro; Minatoya, Kenji; Ueda, Ryoma; Takehara, Masato; Sakamoto, Kazuhisa; Ide, Yujiro; Kanemitsu, Hideo; Ueyama, Koji; Ikeda, Tadashi

    2018-01-01

    Valve-sparing root replacement is increasingly used to overcome drawbacks associated with valvular prostheses. In our institution, 7 patients underwent valve-sparing root replacement from August 2016 to July 2017. The mean age was 45 years (range, 14~69 years). Three patients had Marfan syndrome and 1 had Loeys-Dietz syndrome with acute aortic dissection. All patients underwent surgery with reimplantation technique using a Valsalva graft. Two patients required repair of aortic valve leaflet prolapse. All patients had an excellent clinical course, with mild or no aortic regurgitation and a decrease in end-diastolic volume on echocardiography. These results support the continued use of valve-sparing root replacement in selected patients.

  1. Feedback from operational experience in front-end transportation

    International Nuclear Information System (INIS)

    Mondonel, J.L.; Parison, C.

    1998-01-01

    Transport forms an integral part of the nuclear fuel cycle, representing the strategic link between each stage of the cycle. In a way there is a transport cycle that parallels the nuclear fuel cycle. This concerns particularly the front-end of the cycle whose steps - mining conversion, enrichment and fuel fabrication - require numerous transports. Back-end shipments involve a handful of countries, but front-end transports involve all five continents, and many exotic countries. All over Europe such transports are routinely performed with an excellent safety track record. Transnucleaire dominates the French nuclear transportation market and carries out both front and back-end transports. For instance in 1996 more than 28,400 front-end packages were transported as well as more than 3,600 back-end packages. However front-end transport is now a business undergoing much change. A nuclear transportation company must now cope with an evolving picture including new technical requirements, new transportation schemes and new business conditions. This paper describes the latest evolutions in terms of front-end transportation and the way this activity is carried out by Transnucleaire, and goes on to discuss future prospects. (authors)

  2. Assessment of the Patient-Centered and Family-Centered Care Experience of Total Joint Replacement Patients Using a Shadowing Technique.

    Science.gov (United States)

    Marcus-Aiyeku, Ulanda; DeBari, Margaret; Salmond, Susan

    2015-01-01

    In 2030, when baby boomers reach 65 years of age and represent 18% of the population, it is anticipated that 67 million adults will have a diagnosis of arthritis increasing the demand for total hip and knee arthroplasty. With the growing emphasis on patient- and family-centered care, the aim of this project was to assess the patient experience of patients and families throughout the entire spectrum of the total joint replacement service line care at a university regional trauma hospital. A shadowing methodology as defined by the Institute for Health Improvement was utilized. Eight patient/family groups undergoing total joint replacements were shadowed. The mapped care experience included time, caregiver, activity, shadower observations, and impressions. Findings revealed inconsistencies in the delivery of patient- and family-centered care. Communication and interactions were predominantly provider-centric, with a focus on care routines versus the patient and family, and anticipation that care would be medically directed.

  3. Safe sex

    Science.gov (United States)

    ... sex; Sexually transmitted - safe sex; GC - safe sex; Gonorrhea - safe sex; Herpes - safe sex; HIV - safe sex; ... contact. STIs include: Chlamydia Genital herpes Genital warts Gonorrhea Hepatitis HIV HPV Syphilis STIs are also called ...

  4. End-stage renal failure and national resources: the Brazilian experience.

    Science.gov (United States)

    Zatz, Roberto; Romão, João Egídio

    2006-01-01

    Brazil is the fifth largest and the fifth most populous nation in the world. Its economy rivals Mexico as the strongest in Latin America and ranks among the 15 largest economies in the world. Despite these achievements, a substantial fraction of the Brazilian population still lives in poverty, and many still have limited access to medical assistance. There are currently about 380 patients on hemodialysis per million populations (pmp), approximately one third of the U.S. prevalence, suggesting that a large fraction of end-stage renal disease (ESRD) patients are not diagnosed and treated properly. In Brazil, access to renal replacement therapy (RRT), including renal transplantation, is universal, and the corresponding costs, including those of medications (immunosuppressors and treatment of ESRD complications), are covered by the Brazilian government. However, given the continuous growth of the ESRD population and of the costs incurred by RRT, the efficacy and reach of this system may be severely limited in years to come. In the current struggle against the ESRD epidemics, the Brazilian medical community and health authorities face a triple challenge: to limit the incidence of renal disease, slow or detain the progression of established chronic nephropathies, and ensure that access to quality RRT remains granted to all those who, despite all efforts, reach ESRD.

  5. WNA position statement on safe management of nuclear waste and used nuclear fuel

    International Nuclear Information System (INIS)

    Saint-Pierre, S.

    2006-01-01

    This World nuclear association (W.N.A.) Position Statement summarizes the worldwide nuclear industry's record, progress and plans in safely managing nuclear waste and used nuclear fuel. The global industry's safe waste management practices cover the entire nuclear fuel-cycle, from the mining of uranium to the long-term disposal of end products from nuclear power reactors. The Statement's aim is to provide, in clear and accurate terms, the nuclear industry's 'story' on a crucially important subject often clouded by misinformation. Inevitably, each country and each company employs a management strategy appropriate to a specific national and technical context. This Position Statement reflects a confident industry consensus that a common dedication to sound practices throughout the nuclear industry worldwide is continuing to enhance an already robust global record of safe management of nuclear waste and used nuclear fuel. This text focuses solely on modern civil programmes of nuclear-electricity generation. It does not deal with the substantial quantities of waste from military or early civil nuclear programmes. These wastes fall into the category of 'legacy activities' and are generally accepted as a responsibility of national governments. The clean-up of wastes resulting from 'legacy activities' should not be confused with the limited volume of end products that are routinely produced and safely managed by today's nuclear energy industry. On the significant subject of 'Decommissioning of Nuclear Facilities', which is integral to modern civil nuclear power programmes, the W.N.A. will offer a separate Position Statement covering the industry's safe management of nuclear waste in this context. The safe management of nuclear waste and used nuclear fuel is a widespread, well-demonstrated reality. This strong safety record reflects a high degree of nuclear industry expertise and of industry responsibility toward the well-being of current and future generations

  6. Failure analysis of the Ringhals unit 3 EDM surfaces removed from the RPV outlet nozzle to safe end weld

    International Nuclear Information System (INIS)

    Efsing, Pal; Embring, Goeran; Forssgren, Bjoern; Kroes, Bert; Lundstroem, Roger

    2006-09-01

    During the 2000 RFO (Re-Fueling Outage) In-Service Inspection of the nozzle to safe end weld of the Hot Leg Reactor Pressure Vessel Nozzles in Ringhals 3 and 4, axially oriented defects in the Alloy 182 weld metal were detected. In the case of Ringhals 3, the defects were initially considered as being embedded and thus left for future consideration, whereas the defects in Ringhals 4 were judged as being surface breaking and removed by EDM (Electro Discharge Machining). During the RFO 2001, the defects in Ringhals 3 were also removed by EDM without applying any surface treatment subsequent to the sampling. The cavities were inspected using a standard ET technique for manufacturing control before the plant was allowed to return to service. After one cycle of operation, the cavities resulting from the boat sampling were inspected by ET and UT techniques and indications of renewed, shallow cracking were identified. The indications were pre-dominantly axially oriented, of limited depth and with surface breaking lengths varying from 4 to 18 mm. To investigate the cause of this cracking, it was decided to remove a second series of small boat samples from the areas with indications, prior to implementation of a permanent repair. To minimize the impact on the RFO schedule and the material loss that would have resulted from EDM boat sample removal, mini samples were removed manually, using a small axial grinder. The sampling was performed after nozzle decontamination and used a dry nozzle access system that had been specifically developed for the nozzle repair. The sample removal was completed in approximately two hours and a total of three samples were shipped to the Studsvik hot cell laboratories for failure analysis. The failure analysis revealed a typical surface morphology, resulting from the EDM process and confirmed that numerous micro-fissures may result from the process if it is utilized without proper optimization and care. On one of the boat samples, surface areas

  7. "Without this program, women can lose their lives": migrant women's experiences with the Safe Abortion Referral Programme in Chiang Mai, Thailand.

    Science.gov (United States)

    Tousaw, Ellen; La, Ra Khin; Arnott, Grady; Chinthakanan, Orawee; Foster, Angel M

    2017-11-01

    For displaced and migrant women in northern Thailand, access to health care is often limited, unwanted pregnancy is common, and unsafe abortion is a major contributor to maternal death and disability. Based on a pilot project and situational analysis research, in 2015 a multinational team introduced the Safe Abortion Referral Programme (SARP) in Chiang Mai, Thailand, to reduce the socio-linguistic, economic, documentation, and transportation barriers women from Burma face in accessing safe and legal abortion care in Thailand. Our qualitative study documented the experiences of women with unwanted pregnancies who accessed the SARP in order to inform programme improvement and expansion. We conducted 22 in-depth, in-person interviews and analysed them for content and themes using deductive and inductive techniques. Women were overwhelmingly positive about their experiences using the SARP. They reported lack of costs, friendly programme staff, accompaniment to and interpretation at the providing facility, and safety of services as key features. Financial and legal circumstances shaped access to the programme and women learned about the SARP through word-of-mouth and community workshops. After accessing the SARP and receiving support, women became community advocates for reproductive health. Efforts to expand the programme and raise awareness in migrant communities appear warranted. Our findings suggest that referral programmes for safe and legal abortion can be successful in settings with large displaced and migrant populations. Identifying ways to work within legal constraints to expand access to safe services has the potential to reduce harm from unsafe abortion even in humanitarian settings.

  8. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  9. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  10. Safety at the End of a Nuclear Facility's Life

    International Nuclear Information System (INIS)

    Geis, John A.; McEahern, Patrice; Evans, Brad

    2004-01-01

    The objective of this paper is to capture the changes that are caused by the transition from nuclear operation through closure of defense nuclear facilities and convey lessons learned from their deactivation, decontamination and demolition. The specific area of discussion is focused on the planned reduction of safety equipment and consequent shift in hazard controls and safety management programs as the facility moves toward closure. The premise of the paper is that as the dominant hazards transition from nuclear to radiological and/or industrial, the facility control of the hazards and response to the potential upset conditions must transition as well to ensure safe and efficient operations. Using recent experience of the accelerated closure mission for U. S. Department of Energy (DOE) defense nuclear facilities at Rocky Flats Environmental Technology Site, the current culture with respect to developing and implementing hazard controls and response to upset conditions is illustrated. Several events have been documented that provide insight into the challenges facing line managers and safety professionals at the end of a facility's life cycle. Replacing permanent systems with temporary equipment challenges the traditional concept of reliability. Workers disassemble safety systems daily, but must rely on some of these components or redundant systems as work continues. Decisions governing upkeep of systems that await demolition balance the risk of running to failure against the cost benefit of maintenance and repair. This is further complicated as regulators and safety professionals are often unfamiliar with these new conditions and continue to view facility work activities and potential upset conditions from a nuclear operations perspective. The results of this paper evaluate the differences in how regulatory, safety basis, and operational practices must adapt to the dynamic environment of decontamination and decommissioning in contrast to the relatively constant

  11. EXPERIENCE WITH FPGA-BASED PROCESSOR CORE AS FRONT-END COMPUTER

    International Nuclear Information System (INIS)

    HOFF, L.T.

    2005-01-01

    The RHIC control system architecture follows the familiar ''standard model''. LINUX workstations are used as operator consoles. Front-end computers are distributed around the accelerator, close to equipment being controlled or monitored. These computers are generally based on VMEbus CPU modules running the VxWorks operating system. I/O is typically performed via the VMEbus, or via PMC daughter cards (via an internal PCI bus), or via on-board I/O interfaces (Ethernet or serial). Advances in FPGA size and sophistication now permit running virtual processor ''cores'' within the FPGA logic, including ''cores'' with advanced features such as memory management. Such systems offer certain advantages over traditional VMEbus Front-end computers. Advantages include tighter coupling with FPGA logic, and therefore higher I/O bandwidth, and flexibility in packaging, possibly resulting in a lower noise environment and/or lower cost. This paper presents the experience acquired while porting the RHIC control system to a PowerPC 405 core within a Xilinx FPGA for use in low-level RF control

  12. Experience with mechanical segmentation of reactor internals

    International Nuclear Information System (INIS)

    Carlson, R.; Hedin, G.

    2003-01-01

    Operating experience from BWE:s world-wide has shown that many plants experience initial cracking of the reactor internals after approximately 20 to 25 years of service life. This ''mid-life crisis'', considering a plant design life of 40 years, is now being addressed by many utilities. Successful resolution of these issues should give many more years of trouble-free operation. Replacement of reactor internals could be, in many cases, the most favourable option to achieve this. The proactive strategy of many utilities to replace internals in a planned way is a market-driven effort to minimize the overall costs for power generation, including time spent for handling contingencies and unplanned outages. Based on technical analyses, knowledge about component market prices and in-house costs, a cost-effective, optimized strategy for inspection, mitigation and replacements can be implemented. Also decommissioning of nuclear plants has become a reality for many utilities as numerous plants worldwide are closed due to age and/or other reasons. These facts address a need for safe, fast and cost-effective methods for segmentation of internals. Westinghouse has over the last years developed methods for segmentation of internals and has also carried out successful segmentation projects. Our experience from the segmentation business for Nordic BWR:s is that the most important parameters to consider when choosing a method and equipment for a segmentation project are: - Safety, - Cost-effectiveness, - Cleanliness, - Reliability. (orig.)

  13. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  14. Is Lumbosacral Plexus Block an Effective and Safe Alternative as Surgical Anesthesia for Total Hip Replacement?

    DEFF Research Database (Denmark)

    Nielsen, Niels Dalsgaard; Larsen, Jens Rolighed; Børglum, Jens

    BACKGROUND An increasing number of patients for total hip replacement presents with cardiovascular comorbidities, that render them fragile to traditional methods of anesthesia. The aim of this intended study is to compare lumbosacral plexus blockade with continuous spinal anesthesia for surgical ...

  15. Lifetime risk of renal replacement therapy in Europe

    DEFF Research Database (Denmark)

    van den Brand, Jan A J G; Pippias, Maria; Stel, Vianda S

    2017-01-01

    Background: Upcoming KDIGO guidelines for the evaluation of living kidney donors are expected to move towards a personal risk-based evaluation of potential donors. We present the age and sex-specific lifetime risk of renal replacement therapy (RRT) for end-stage renal disease in 10 European...

  16. The Lived Experience of Patients Receiving Hemodialysis Treatment for End-Stage Renal Disease: A Qualitative Study.

    Science.gov (United States)

    Chiaranai, Chantira

    2016-06-01

    End-stage renal disease (ESRD), the last stage of chronic kidney disease, is the point at which the kidneys are no longer able to support the body's needs. Thus, ESRD significantly impacts the day-to-day life of patients. To improve bodily functions and prolong life, patients with ESRD require renal replacement therapy in the form of either hemodialysis (HD) or kidney transplantation. Research has documented the impact of ESRD and HD on quality of life. There is a lack of qualitative studies that describe how ESRD sufferers in Thailand cope with daily life. This study aimed to better understand the daily life experiences of Thai patients with ESRD who are on HD. This study used a phenomenological approach and a semistructured interview guide. Thai men and women with ESRD and on HD were purposively recruited from an HD unit at one hospital in Thailand between February and May 2013. Inclusion criteria included (a) currently being treated for HD, (b) ability to communicate in Thai, and (c) age of over 18 years. Participants were asked to describe their problems, feelings, thoughts, and attitudes as well as how they experienced their lives. Data saturation was reached after the completion of 26 interviews. The data were analyzed using thematic analysis. The following themes emerged from the data: (a) facing life's limitations, (b) living with uncertainty, and (c) dependence on medical technology. The authors hope that the findings increase the understanding of healthcare providers about the lived experience of Thai patients with ESRD on HD. Greater understanding is critical in helping healthcare providers identify the changes in practice that will be necessary to better care for and integrate the best holistic practices into standardized care for this population.

  17. Plutonium safe handling

    International Nuclear Information System (INIS)

    Tvehlov, Yu.

    2000-01-01

    The abstract, prepared on the basis of materials of the IAEA new leadership on the plutonium safe handling and its storage (the publication no. 9 in the Safety Reports Series), aimed at presenting internationally acknowledged criteria on the radiation danger evaluation and summarizing the experience in the safe management of great quantities of plutonium, accumulated in the nuclear states, is presented. The data on the weapon-class and civil plutonium, the degree of its danger, the measures for provision of its safety, including the data on accident radiation consequences with the fission number 10 18 , are presented. The recommendations, making it possible to eliminate the super- criticality danger, as well as ignition and explosion, to maintain the tightness of the facility, aimed at excluding the radioactive contamination and the possibility of internal irradiation, to provide for the plutonium security, physical protection and to reduce irradiation are given [ru

  18. Reducing replacement donors in Sub-Saharan Africa: challenges and affordability.

    Science.gov (United States)

    Bates, I; Manyasi, G; Medina Lara, A

    2007-12-01

    In 1975, the World Health Assembly recommended that blood for transfusion should come from voluntary, non-remunerated donors; yet, in Africa, 75-80% of blood for transfusion still comes from hospital-based replacement donors. Although comprehensive economic data are scarce, evidence indicates that blood from voluntary donors recruited and screened at centralized transfusion centres, costs four to eight times as much as blood from a hospital-based, replacement donor system. Donor recruitment, quality assurance systems and distribution mechanisms in the centralized system are major reasons for the cost difference. There are concerns about the sustainability of centralized voluntary donor systems and their compatibility with the levels of health care that exist in many poor countries yet burdening patients' families with the responsibility of finding replacement blood donors will exacerbate poverty and reduce the safety of the blood supply. There are measures that can be introduced into hospital-based systems to improve safe blood supply in Africa but their effectiveness in different contexts needs to be evaluated.

  19. Outcomes of Reoperative Valve Replacement in Patients with Prosthetic Valve Endocarditis: A 20-Year Experience

    Directory of Open Access Journals (Sweden)

    Young Woong Kim

    2018-02-01

    Full Text Available Background: Prosthetic valve endocarditis (PVE is a serious complication of cardiac valve replacement, and many p atients with P VE r equire r eoperation. The aim of t his study was to r eview our institutional 2 0 -year experience of surgical reoperative valve replacement in patients with PVE. Methods: A retrospective study was performed on 84 patients (mean age, 54.8±12.7 years; 51 males who were diagnosed with PVE and underwent reoperative valve replacement from January 1995 to December 2016. Results: PVE was found in 1 valve in 61 cases (72.6%, and in 2 or more valves in 23 cases (27.4%. The median follow-up duration was 47.3 months (range, 0 to 250 months. Postoperative complications occurred in 39 patients (46.4%. Reinfection occurred in 6 cases, all within 1 year. The freedom from reinfection rate at 5 years was 91.0%±3.5%. The overall survival rates at 5 and 10 years were 64.4%±5.8% and 54.3%±7.3%, respectively. In stepwise multivariable Cox proportional hazard models, older age (hazard ratio [HR], 1.48; 95% confidence interval [CI], 1.05 to 2.10; p=0.027 and cardiopulmonary bypass (CPB time (HR, 1.03; 95% CI, 1.00 to 1.0 1; p =0 . 0 33 e merged a s independent risk f actors f or d eath. Conclusion: Older age and a longer CPB time were associated with an increased risk of overall mortality in PVE patients.

  20. Experimental and thermodynamic studies of beryllium replacement materials for CANDU brazed joints

    Energy Technology Data Exchange (ETDEWEB)

    Potter, K.N.; Ferrier, G.A.; Corcoran, E.C., E-mail: Kieran.Potter@rmc.ca [Royal Military College of Canada, Kingston, ON (Canada)

    2015-07-01

    Currently, appendages are joined to CANDU fuel elements via a brazing process, which uses beryllium as the filler material. A potential reduction in the occupational limit on airborne beryllium particulates has motivated research into alternative brazing materials. To this end, the Canadian nuclear industry has funded an initiative to identify and evaluate the suitability of several candidate materials. This work describes contributions toward the assessment of alternative brazing materials from the Royal Military College of Canada. Thermodynamic modelling was performed to predict the aqueous behaviour of each candidate material in CANDU coolant conditions characteristic of reactor shutdown, and experiments are underway to support modelling predictions. These results will assist in selecting a suitable replacement material for beryllium. (author)

  1. Clinical study on postoperative steroid hormon replacement for preclinical Cushing's syndrome

    International Nuclear Information System (INIS)

    Furuta, Nozomu; Koide, Haruhisa; Sasaki, Hiroshi; Miki, Jun; Kimura, Takahiro; Egawa, Shin

    2009-01-01

    replacement. Decrease starting dose of steroid hormone replacement for appropriate patients could shorten the period of steroid hormone replacement safely. (author)

  2. Building world-wide nuclear industry success stories - Safe management of nuclear waste and used nuclear fuel

    International Nuclear Information System (INIS)

    Saint-Pierre, S.

    2005-01-01

    Full text: This WNA Position Statement summarizes the worldwide nuclear industry's record, progress and plans in safely managing nuclear waste and used nuclear fuel. The global industry's safe waste management practices cover the entire nuclear fuel-cycle, from the mining of uranium to the long-term disposal of end products from nuclear power reactors. The Statement's aim is to provide, in clear and accurate terms, the nuclear industry's 'story' on a crucially important subject often clouded by misinformation. Inevitably, each country and each company employs a management strategy appropriate to a specific national and technical context. This Position Statement reflects a confident industry consensus that a common dedication to sound practices throughout the nuclear industry worldwide is continuing to enhance an already robust global record of safe management of nuclear waste and used nuclear fuel. This text focuses solely on modern civil programmes of nuclear-electricity generation. It does not deal with the substantial quantities of waste from military or early civil nuclear programmes. These wastes fall into the category of 'legacy activities' and are generally accepted as a responsibility of national governments. The clean-up of wastes resulting from 'legacy activities' should not be confused with the limited volume of end products that are routinely produced and safely managed by today's nuclear energy industry. On the significant subject of 'Decommissioning of Nuclear Facilities', which is integral to modern civil nuclear power programmes, the WNA will offer a separate Position Statement covering the industry's safe management of nuclear waste in this context. The safe management of nuclear waste and used nuclear fuel is a widespread, well-demonstrated reality. This strong safety record reflects a high degree of nuclear industry expertise and of industry responsibility toward the well-being of current and future generations. Accumulating experience and

  3. Effect of safe water on arsenicosis: A follow-up study

    Directory of Open Access Journals (Sweden)

    Kunal K Majumdar

    2014-01-01

    Full Text Available Background: Arsenic pollution in groundwater, used for drinking purposes, has been envisaged as a problem of global concern. Treatment options for the management symptoms of chronic arsenicosis are limited. Mitigation option available for dealing with the health problem of ground water arsenic contamination rests mainly on supply of arsenic safe water in arsenic-endemic region of Indo-Bangladesh subcontinent. Limited information is available regarding the long-term effect of chronic arsenic toxicity after stoppage of consumption of arsenic-containing water. Objective: The current study was, therefore, done to assess, objectively, the effect of drinking arsenic safe water (<50 μg/L on disease manifestation of arsenicosis. Results: Manifestations of various skin lesions and systemic diseases associated with chronic arsenic exposure were ascertained initially by carrying on baseline study on 208 participants in Nadia (Cohort-I, with skin lesion and Cohort-II, without skin lesion using a scoring system, as developed by us, and compared objectively at the end of each year for 3 year follow-up period. All the participants who had arsenic contaminated drinking water source in their houses were supplied with arsenic removal filters for getting arsenic-free water during the follow-up period. In participants belonging to Cohort-I, the skin score was found to improve significantly at the end of each year, and it was found to be reduced significantly from 2.17 ± 1.09 to 1.23 ± 1.17; P < 0.001 at the end of 3 year′s intervention study indicating beneficial effect of safe water on skin lesions. The systemic disease symptom score was also found to improve, but less significantly, at the end of 3 years in both the cohorts. Most important observation during the follow-up study was persistence of severe symptoms of chronic lung disease and severe skin lesion including Bowen′s disease in spite of taking arsenic-safe water. Further, death could not be

  4. Dual-sided electrosurgery handpiece for simultaneous tissue cutting and coagulation: first report on a conceptual design validated by an animal experiment

    Directory of Open Access Journals (Sweden)

    Tawfik HA

    2015-08-01

    Full Text Available Hatem A Tawfik,1 Yousef A Fouad,2 Rashad Hafez3 1Department of Ophthalmology, Oculoplastics Service, Ain Shams University, 2Faculty of Medicine, Ain Shams University, 3Eye Subspecialty Centre, Cairo, Egypt Objective: To introduce and evaluate the safety of a novel dual-sided electrosurgery handpiece design for simultaneous tissue cutting and coagulation. Methods: We designed a prototype double-sided handpiece allowing automatic switching between two electrodes with a simple handpiece flip. The concept of the system as a surgical instrument was assessed by an animal experiment. Results: The skin of 15 Wistar albino white rats could be successfully incised and coagulated using both ends of the handpiece, thereby confirming the prospects and clinical applications of the system. Conclusion: The dual-sided electrosurgery handpiece is a simple and safe alternative to the traditional electrosurgery pencil, allowing the simultaneous use of two electrodes without the hassle of frequent electrode replacement. Keywords: radiosurgery, ablative surgery, laser resurfacing, electrocautery, electrosurgery

  5. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  6. End-of-life experiences and expectations of Africans in Australia: cultural implications for palliative and hospice care.

    Science.gov (United States)

    Hiruy, Kiros; Mwanri, Lillian

    2014-03-01

    The ageing and frail migrants who are at the end of life are an increasing share of migrants living in Australia. However, within such populations, information about end-of-life experiences is limited, particularly among Africans. This article provides some insights into the sociocultural end-of-life experiences of Africans in Australia and their interaction with the health services in general and end-of-life care in particular. It provides points for discussion to consider an ethical framework that include Afro-communitarian ethical principles to enhance the capacity of current health services to provide culturally appropriate and ethical care. This article contributes to our knowledge regarding the provision of culturally appropriate and ethical care to African patients and their families by enabling the learning of health service providers to improve the competence of palliative care systems and professionals in Australia. Additionally, it initiates the discussion to highlight the importance of paying sufficient attention to a diverse range of factors including the migration history when providing palliative and hospice care for patients from African migrant populations.

  7. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  8. Canadian Organ Replacement Register (CORR: Reflecting the Past and Embracing the Future

    Directory of Open Access Journals (Sweden)

    Louise M Moist

    2014-10-01

    Full Text Available Introduction: The Canadian Organ Replacement Register (CORR is the only Canadian information system on kidney and extra-kidney organ failure and transplantation in Canada. CORR's mandate is to record and analyze the level of activity and outcomes of vital organ transplantation and treatment of end stage kidney disease using dialysis, either hemodialysis or peritoneal dialysis, activities across Canada. The Canadian Organ Replacement Register was officially launched in 1987, and it included transplantation of extra-renal vital organs (liver, heart, lung, pancreas, bowel, in addition to renal transplantation and replacement therapy, with new financial support from the provinces. Objective: This manuscript describes the process of data acquisition and reporting, focusing on the patients with end stage kidney disease on dialysis, with data reported from the 2014 CORR Annual Data Report and the Center-Specific Reports on Clinical Measures. Methods: CORR is currently housed in the Canadian Institute for Health Information and collects data from hospital dialysis programs, regional transplant programs, organ procurement organizations and kidney dialysis services offered at independent health facilities. Data on patients is collected by completion of survey forms for each patient at the start of dialysis or receiving a transplant, using the Initial Registration form, and yearly follow up forms, which collects data on the status of the patient as of October 31 st . Results: The incident rate per million population (RPMP has remained stable with the exception of the 65+ age group with has experience a modest decrease since 2001. However, there has been an increasing prevalence of ESKD diagnoses, with the highest rate per million population (RPMP amongst the age group 65+ years. This is likely attributed to gradual improving patient survival. Between 2003 and 2012, nearly 90% of dialysis patients younger than < 18 and 26% of patients 75+ years survived for

  9. Perceptions and experiences of nursing students enrolled in a palliative and end-of-life nursing elective: A qualitative study.

    Science.gov (United States)

    Hold, Judith L; Blake, Barbara J; Ward, Elizabeth N

    2015-06-01

    The Carnegie Foundation has identified three professional apprenticeships in nursing that are key to helping students acquire a professional identity. These apprenticeships integrate knowledge acquisition (cognitive apprenticeship), practical experience (practical apprenticeship), and an ethical identity (ethical comportment) for guiding conduct. To ensure that patients have a good death, it is important that faculty incorporate diverse teaching strategies from all three apprenticeships into palliative and end-of life nursing education. The purpose of this study was to examine perceptions and experiences of nursing students enrolled in a palliative and end-of-life nursing elective that was developed and implemented using the three professional apprenticeships. A qualitative research design was used to obtain data from students who completed the palliative and end-of-life nursing elective. The study was implemented at a state supported baccalaureate nursing program located in the south eastern United States. A purposive sample of 19 students who had completed the palliative and end-of-life nursing elective was included in the study. After completing the course, focus groups were conducted with the student participants. Discussion was guided by questions to elicit which experiences were most helpful to student learning. Thematic analysis of the data was conducted by three researchers. Three themes reflecting the apprenticeships were identified: learning from stories, learning from being there, and learning from caring. Students' understandings about end-of-life care were enhanced by incorporating teaching strategies addressing the apprenticeships. In end-of-life nursing education, teaching strategies must provide meaningful connections between the student, course content, practical experience, and the dying patient. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. Engineering of small interfering RNA-loaded lipidoid-poly(DL-lactic-co-glycolic acid) hybrid nanoparticles for highly efficient and safe gene silencing: A quality by design-based approach

    DEFF Research Database (Denmark)

    Thanki, Kaushik; Zeng, Xianghui; Justesen, Sarah

    2017-01-01

    used and poorly tolerated cationic lipids might be replaced with more efficacious and safe lipidoids as the lipid component of siRNA-loaded lipid-polymer hybrid nanoparticles (LPNs) for achieving more efficient gene silencing at lower and safer doses. However, formulation design of such a complex...... formulation is highly challenging due to a strong interplay between several contributing factors. Hence, critical formulation variables, i.e. the lipidoid content and siRNA:lipidoid ratio, were initially identified, followed by a systematic quality-by-design approach to define the optimal operating space (OOS......), eventually resulting in the identification of a robust, highly efficacious and safe formulation. A 17-run design of experiment with an I-optimal approach was performed to systematically assess the effect of selected variables on critical quality attributes (CQAs), i.e. physicochemical properties...

  11. Nuclear spent fuel management. Experience and options

    International Nuclear Information System (INIS)

    1986-01-01

    Spent nuclear fuel can be stored safely for long periods at relatively low cost, but some form of permanent disposal will eventually be necessary. This report examines the options for spent fuel management, explores the future prospects for each stage of the back-end of the fuel cycle and provides a thorough review of past experience and the technical status of the alternatives. Current policies and practices in twelve OECD countries are surveyed

  12. Rear end collision: Causes and avoidance techniques

    NARCIS (Netherlands)

    Nekovee, Maziar; Bie, Jing; Naja, Rola

    2013-01-01

    Rear-end collision is one of the most frequent accidents occurring on roadways. This chapter investigates how vehicle’s local parameters in a platoon of cars (i.e., perception and information collection, vehicle speed, safe distance, braking parameters) affect the global behavior of the traffic

  13. "Parents a dead end life": The main experiences of parents of children with leukemia.

    Science.gov (United States)

    Jadidi, Rahmatollah; Hekmatpou, Davood; Eghbali, Aziz; Memari, Fereshteh; Anbari, Zohreh

    2014-11-01

    The quantitative studies show that due to the widespread prevalence, high death rate, high treatment expenses, and long hospital stay, leukemia influences the families and their children to a great extent. In this regard, no qualitative study has been conducted in Iran. So, this study was conducted in Arak in 2011 with the aim of expressing the experiences of the parents whose children suffered from leukemia. Using qualitative research approach, by applying content analysis method, 22 participants were interviewed in two educational hospitals during 2 months. The study was started by purposive sampling and continued by theoretical one. The data were analyzed based on the content analysis method. Data analysis showed that insolvency, knapsack problems, cancer secrecy, trust on God, self-sacrifice, adaptation, medical malpractice, and hospital facilities were the level 3 codes of parents' experiences and "parents a dead end life" was the main theme of this study. In this study, the experiences of the parents whose children suffered from cancer were studied deeply by the use of qualitative method, especially by the use of resources syncretism rather than studying quantitatively. Parents a dead end life emerged as the main theme of this study, emphasizing the necessity of paying further attention to the parents. On the other hand, making more use of parents' experiences and encouraging them helps make the treatment more effective. It is suggested that these experiences be shared with parents in the form of pamphlets distributed right at the beginning of the treatment process.

  14. Contribution of V(H replacement products in mouse antibody repertoire.

    Directory of Open Access Journals (Sweden)

    Lin Huang

    Full Text Available VH replacement occurs through RAG-mediated recombination between the cryptic recombination signal sequence (cRSS near the 3' end of a rearranged VH gene and the 23-bp RSS from an upstream unrearranged VH gene. Due to the location of the cRSS, VH replacement leaves a short stretch of nucleotides from the previously rearranged VH gene at the newly formed V-D junction, which can be used as a marker to identify VH replacement products. To determine the contribution of VH replacement products to mouse antibody repertoire, we developed a Java-based VH Replacement Footprint Analyzer (VHRFA program and analyzed 17,179 mouse IgH gene sequences from the NCBI database to identify VH replacement products. The overall frequency of VH replacement products in these IgH genes is 5.29% based on the identification of pentameric VH replacement footprints at their V-D junctions. The identified VH replacement products are distributed similarly in IgH genes using most families of VH genes, although different families of VH genes are used differentially. The frequencies of VH replacement products are significantly elevated in IgH genes derived from several strains of autoimmune prone mice and in IgH genes encoding autoantibodies. Moreover, the identified VH replacement footprints in IgH genes from autoimmune prone mice or IgH genes encoding autoantibodies preferentially encode positively charged amino acids. These results revealed a significant contribution of VH replacement products to the diversification of antibody repertoire and potentially, to the generation of autoantibodies in mice.

  15. Experiences and Preferences for End-of-Life Care for Young Adults with Cancer and Their Informal Carers: A Narrative Synthesis.

    Science.gov (United States)

    Ngwenya, Nothando; Kenten, Charlotte; Jones, Louise; Gibson, Faith; Pearce, Susie; Flatley, Mary; Hough, Rachael; Stirling, L Caroline; Taylor, Rachel M; Wong, Geoff; Whelan, Jeremy

    2017-06-01

    To review the qualitative literature on experiences of and preferences for end-of-life care of people with cancer aged 16-40 years (young adults) and their informal carers. A systematic review using narrative synthesis of qualitative studies using the 2006 UK Economic and Social Research Council research methods program guidance. Seven electronic bibliographic databases, two clinical trials databases, and three relevant theses databases were searched from January 2004 to October 2015. Eighteen articles were included from twelve countries. The selected studies included at least 5% of their patient sample within the age range 16-40 years. The studies were heterogeneous in their aims, focus, and sample, but described different aspects of end-of-life care for people with cancer. Positive experiences included facilitating adaptive coping and receiving palliative home care, while negative experiences were loss of "self" and nonfacilitative services and environment. Preferences included a family-centered approach to care, honest conversations about end of life, and facilitating normality. There is little evidence focused on the end-of-life needs of young adults. Analysis of reports including some young adults does not explore experience or preferences by age; therefore, it is difficult to identify age-specific issues clearly. From this review, we suggest that supportive interventions and education are needed to facilitate open and honest communication at an appropriate level with young people. Future research should focus on age-specific evidence about the end-of-life experiences and preferences for young adults with cancer and their informal carers.

  16. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  17. PMS49 – Empirical comparison of discrete choice experiment and best-worst scaling to estimate stakeholders' risk tolerance for hip replacement surgery

    NARCIS (Netherlands)

    van Dijk, J.D.; Groothuis-Oudshoorn, Karin; Marshall, D.; IJzerman, Maarten Joost

    2013-01-01

    Objectives Empirical comparison of two preference elicitation methods, discrete choice experiment (DCE) and profile case best-worst scaling (BWS), regarding the estimation of the risk tolerance for hip replacement surgery (total hip arthroplasty and total hip resurfacing arthroplasty). Methods An

  18. Exploring family experiences of nursing aspects of end-of-life care in the ICU: A qualitative study.

    Science.gov (United States)

    Noome, Marijke; Dijkstra, Boukje M; van Leeuwen, Evert; Vloet, Lilian C M

    2016-04-01

    The aim of this study was to examine the experience(s) of family with the nursing aspects of End-of-life care in the intensive care unit after a decision to end life-sustaining treatment, and to describe what nursing care was most appreciated and what was lacking. A phenomenological approach including inductive thematic analysis was used. Twenty-six family members of deceased critically ill-patients were interviewed within two months after the patient's death about their experiences with nursing aspects of end-of-life care in the intensive care unit. Most family members experienced nursing contribution to end-of-life care of the patient and themselves, especially supportive care. Families mentioned the following topics: Communication between intensive care nurses, critically ill patients and family; Nursing care for critically ill patients; Nursing care for families of critically ill patients; Pre-conditions. Families appreciated that intensive care nurses were available at any time and willing to answer questions. But care was lacking because families had for example, a sense of responsibility for obtaining information, they had problems to understand their role in the decision-making process, and were not invited by nurses to participate in the care. Most family appreciated the nursing EOLC they received, specifically the nursing care given to the patient and themselves. Some topics needed more attention, like information and support for the family. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    Science.gov (United States)

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  20. Flexible End2End Workflow Automation of Hit-Discovery Research.

    Science.gov (United States)

    Holzmüller-Laue, Silke; Göde, Bernd; Thurow, Kerstin

    2014-08-01

    The article considers a new approach of more complex laboratory automation at the workflow layer. The authors purpose the automation of end2end workflows. The combination of all relevant subprocesses-whether automated or manually performed, independently, and in which organizational unit-results in end2end processes that include all result dependencies. The end2end approach focuses on not only the classical experiments in synthesis or screening, but also on auxiliary processes such as the production and storage of chemicals, cell culturing, and maintenance as well as preparatory activities and analyses of experiments. Furthermore, the connection of control flow and data flow in the same process model leads to reducing of effort of the data transfer between the involved systems, including the necessary data transformations. This end2end laboratory automation can be realized effectively with the modern methods of business process management (BPM). This approach is based on a new standardization of the process-modeling notation Business Process Model and Notation 2.0. In drug discovery, several scientific disciplines act together with manifold modern methods, technologies, and a wide range of automated instruments for the discovery and design of target-based drugs. The article discusses the novel BPM-based automation concept with an implemented example of a high-throughput screening of previously synthesized compound libraries. © 2014 Society for Laboratory Automation and Screening.

  1. A knowledge synthesis of culturally- and spiritually-sensitive end-of-life care: findings from a scoping review

    OpenAIRE

    Fang, Mei Lan; Sixsmith, Judith; Sinclair, Shane; Horst, Glen

    2016-01-01

    Background Multiple factors influence the end-of-life (EoL) care and experience of poor quality services by culturally- and spiritually-diverse groups. Access to EoL services e.g. health and social supports at home or in hospices is difficult for ethnic minorities compared to white European groups. A tool is required to empower patients and families to access culturally-safe care. This review was undertaken by the Canadian Virtual Hospice as a foundation for this tool. Methods To explore atti...

  2. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  3. Tester of the TRT front-end electronics for the ATLAS-experiment

    CERN Document Server

    Hajduk, Z; Kisielewski, B; Kotarba, A; Malecki, P; Natkaniec, Z; Olszowska, J; Ostrowicz, W; Krupinska, G

    2000-01-01

    The VME based tester for front-end electronics of the TRT (Transition Radiation Tracker) detector of the ATLAS-LHC experiment at CERN, Geneva, is described. The TRT read-out electronics for 424576 proportional tubes grouped on many thousands of cards requires stringent quality control after assembly and during installation. The tester provides all required data, pulses, timing and power supplies for tested cards. The essential part of the tester is its software that allows for device handling as well as facilitates functional and statistical tests. The prototype, present design as well as the new design for mass production tests are discussed. (17 refs).

  4. The experiences of pediatric social workers providing end-of-life care.

    Science.gov (United States)

    Muskat, Barbara; Brownstone, David; Greenblatt, Andrea

    2017-07-01

    Pediatric social workers working in acute care hospital settings may care for children and their families in end-of-life circumstances. This qualitative study is part of a larger study focusing on the experiences of health care providers working with dying children. This study consisted of 9 semi-structured interviews of acute care pediatric social workers who work with dying children and their families. Themes included the role of social work with dying children, the impact of their work and coping strategies. Authors suggest a hospital-worker partnership in supporting staff and promotion of supportive resources.

  5. Fail-safe system for activity cooled supersonic and hypersonic aircraft. [using liquid hydrogen fuel

    Science.gov (United States)

    Jones, R. A.; Braswell, D. O.; Richie, C. B.

    1975-01-01

    A fail-safe-system concept was studied as an alternative to a redundant active cooling system for supersonic and hypersonic aircraft which use the heat sink of liquid-hydrogen fuel for cooling the aircraft structure. This concept consists of an abort maneuver by the aircraft and a passive thermal protection system (TPS) for the aircraft skin. The abort manuever provides a low-heat-load descent from normal cruise speed to a lower speed at which cooling is unnecessary, and the passive TPS allows the aircraft skin to absorb the abort heat load without exceeding critical skin temperature. On the basis of results obtained, it appears that this fail-safe-system concept warrants further consideration, inasmuch as a fail-safe system could possibly replace a redundant active cooling system with no increase in weight and would offer other potential advantages.

  6. Reconstruction of lower end of radius using vascularized upper end of fibula

    Directory of Open Access Journals (Sweden)

    Koul Ashok

    2007-01-01

    Full Text Available Background: Giant cell tumor is a fairly common locally invasive tumor in young adults. The lower end of the radius is the second commonest site for this tumor. The most common treatment for this tumor is curettage with or without bone grafting but it carries a significant rate of recurrence. Excision is the treatment of choice, especially for cases in which the cortex has been breached. After excision of the distal end of the radius, different procedures have been described to reconstruct the defect of distal radius. These include partial arthrodesis and hemiarthroplasty using the upper end of the fibula. The upper end of the fibula has a morphological resemblance to the lower end of the radius and has been used to replace the latter. Traditionally it was used as a ′free′ (non-vascularized graft. More recently the upper end of the fibula has been transferred as a vascularized transfer for the same purpose. Though vascularized transfer should be expected to be more physiological, its superiority over the technically simpler non-vascularized transfer has not been conclusively proven. Materials and Methods: Two patients are presented who had giant cell tumor of distal radius. They underwent wide local excision and reconstruction with free vascularized upper end of the fibula. Result: Follow-up period was two and a half years and 12 months respectively. Both patients have returned to routine work. One patient has excellent functional result and the other has a good result. Conclusion: Vascularized upper end of fibula transfer is a reliable method of reconstruction for loss of the distal end of the radius that restores local anatomy and physiology.

  7. Hospice family members’ perceptions and experiences with end-of-life care in the nursing home

    Science.gov (United States)

    Washington, Karla; Kruse, Robin L.; Albright, David L; Lewis, Alexandria; Demiris, George

    2014-01-01

    Objective Despite the fact that more than 25% of Americans die in nursing homes, end-of-life care has consistently been found to be less than adequate in this setting. Even for those residents on hospice, end-of-life care has been found to be problematic. This study had two research questions; 1) How do family members of hospice nursing home residents differ in their anxiety, depression, quality of life, social networks, perceptions of pain medication, and health compared to family members of community dwelling hospice patients? 2) What are family members’ perceptions of and experiences with end-of-life care in the nursing home setting? Methods This study is a secondary mixed methods analysis of interviews with family members of hospice nursing home residents and a comparative statistical analysis of standard outcome measures between family members of hospice patients in the nursing home and family member of hospice patients residing in the community. Results Outcome measures for family members of nursing home residents were compared (n=176) with family members of community dwelling hospice patients (n=267). The family members of nursing home residents reported higher quality of life however, levels of anxiety, depression, perceptions of pain medicine, and health were similar for hospice family members in the nursing home and in the community. Lending an understanding to the stress for hospice family members of nursing home residents concerns were found with collaboration between the nursing home and the hospice, nursing home care that did not meet family expectations, communication problems, and resident care concerns including pain management. Some family members reported positive end-of-life care experiences in the nursing home setting. Conclusion These interviews identify a multitude of barriers to quality end-of-life care in the nursing home setting, and demonstrate that support for family members is an essential part of quality end-of-life care for

  8. Working to End Family Homelessness. Annual Report

    Science.gov (United States)

    National Center on Family Homelessness (NJ1), 2012

    2012-01-01

    The National Center on Family Homelessness is determined to end family homelessness. Sheltering families provides a temporary safe haven. Connecting families to permanent housing, essential services, and critical supports can change their lives forever. Through research the Center learns what families need to rebound from the housing, economic,…

  9. Low-temperature thermionics in space nuclear power systems with the safe-type fast reactor

    International Nuclear Information System (INIS)

    Zrodnikov, A.V.; Yarygin, V.I.; Lazarenko, G.E.; Zabudko, A.N.; Ovcharenko, M.K.; Pyshko, A.P.; Mironov, V.S.; Kuznetsov, R.V.

    2007-01-01

    The potentialities of the use of the low-temperature thermionic converters (TIC) with the emitter temperature ≤ 1500 K in the space nuclear power system (SNPS) with the SAFE-type (Safe Affordable Fission Engine) fast reactor proposed and developed by common efforts of American experts have been considered. The main directions of the 'SAFE-300-TEG' SNPS (300 kW(thermal)) design update by replacing the thermoelectric converters with the low-temperature high-performance thermionic converters (with the barrier index V B ≤ 1.9 eV and efficiency ≥ 10%) meant for a long-term operation (5 years at least) as the components of the SAFE-300-TIC SNPS for a Lunar base have been discussed. The concept of the SNPS with the SAFE-type fast reactor and low-temperature TICs with specific electric power of about 1.45 W/cm 2 as the components of the SAFE-300-TIC system meeting the Nasa's initial requirements to a Lunar base with the electric power demand of about 30 kW(electrical) for robotic mission has been considered. The results, involving optimization and mass-and-size estimation, show that the SAFE-300-TIC system meets the initial requirements by Nasa to the lunar base power supply. The main directions of the system update aimed at the output electric power increase up to 100 kW(electrical) have also been presented. (authors)

  10. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  11. Smart aircraft fastener evaluation (SAFE) system: a condition-based corrosion detection system for aging aircraft

    Science.gov (United States)

    Schoess, Jeffrey N.; Seifert, Greg; Paul, Clare A.

    1996-05-01

    The smart aircraft fastener evaluation (SAFE) system is an advanced structural health monitoring effort to detect and characterize corrosion in hidden and inaccessible locations of aircraft structures. Hidden corrosion is the number one logistics problem for the U.S. Air Force, with an estimated maintenance cost of $700M per year in 1990 dollars. The SAFE system incorporates a solid-state electrochemical microsensor and smart sensor electronics in the body of a Hi-Lok aircraft fastener to process and autonomously report corrosion status to aircraft maintenance personnel. The long-term payoff for using SAFE technology will be in predictive maintenance for aging aircraft and rotorcraft systems, fugitive emissions applications such as control valves, chemical pipeline vessels, and industrial boilers. Predictive maintenance capability, service, and repair will replace the current practice of scheduled maintenance to substantially reduce operational costs. A summary of the SAFE concept, laboratory test results, and future field test plans is presented.

  12. MANAGEMENT OF FAILED MITRAL VALVE REPLACEMENT. THE DURBAN EXPERIENCE.

    Science.gov (United States)

    Kistan, D; Booysen, M; Alexander, G; Madiba, T E

    2017-06-01

    Mitral valve replacement is the procedure of choice in patients with severe mitral valve disease. However, these patients are surviving longer and are thus at an increased risk of prosthesis failure or valve-related complications. Study setting: Inkosi Albert Luthuli Central Hospital, a tertiary referral Hospital in Durban. Study population: All patients undergoing redo mechanical mitral valve replacement surgery between January 2005 and December 2014. Study design: Retrospective analysis of patients undergoing redo mitral valve replacement. Patients were identified from theatre record books, their files were electronically accessed and pertinent information extracted onto a data capture sheet. Information documented included demographics, duration to failure, INR, Albumin, HIV status, clinical findings and outcome. The data was stored on an Excel datasheet. Fifty-eight patients were documented (mean age 32 ± 15.81 years; M:F 1:3). Ten patients (17%) were HIV positive (median CD4 count 478). Mean duration between first surgery and redo was 8.8 years. Thirty-five patients (60%) had no co-morbidities. Presenting features at redo surgery were congestive cardiac failure (27), chest pain (11) and palpitations (17). Mean preoperative Ejection Fraction was 51.65 %. Twenty-nine patients (55%) had emergency redo surgery. Twenty-two patients (75%) had acute prosthetic valve thrombosis. Thirty-two patients had tricuspid regurgitation. Original pathology was documented in 23 patients (40%) as Rheumatic valve disease. Prosthetic valve thrombosis was documented in 31 patients (54%). The most commonly used valve was the On-X. Mean presenting INR was 1.96 + 1.2 and mean presenting serum albumin was 36.7 + 7.8 g/l. Forty-one patients (71%) were found to be compliant to Warfarin therapy prior to redo surgery. Mean ICU stay was 6 +9 days. Two patients died postoperatively. Mean followup was 32 + 26.6 months. Twelve patients (20.7%) developed postoperative complications. Patients

  13. World Nuclear Association position statement: Safe management of nuclear waste and used nuclear fuel

    International Nuclear Information System (INIS)

    Saint-Pierre, Sylvain

    2006-01-01

    This WNA Position Statement summarises the worldwide nuclear industry's record, progress and plans in safely managing nuclear waste and used nuclear fuel. The global industry's safe waste management practices cover the entire nuclear fuel-cycle, from the mining of uranium to the long-term disposal of end products from nuclear power reactors. The Statement's aim is to provide, in clear and accurate terms, the nuclear industry's 'story' on a crucially important subject often clouded by misinformation. Inevitably, each country and each company employs a management strategy appropriate to a specific national and technical context. This Position Statement reflects a confident industry consensus that a common dedication to sound practices throughout the nuclear industry worldwide is continuing to enhance an already robust global record of safe management of nuclear waste and used nuclear fuel. This text focuses solely on modern civil programmes of nuclear-electricity generation. It does not deal with the substantial quantities of waste from military or early civil nuclear programmes. These wastes fall into the category of 'legacy activities' and are generally accepted as a responsibility of national governments. The clean-up of wastes resulting from 'legacy activities' should not be confused with the limited volume of end products that are routinely produced and safely managed by today's nuclear energy industry. On the significant subject of 'Decommissioning of Nuclear Facilities', which is integral to modern civil nuclear power programmes, the WNA will offer a separate Position Statement covering the industry's safe management of nuclear waste in this context. The paper's conclusion is that the safe management of nuclear waste and used nuclear fuel is a widespread, well-demonstrated reality. This strong safety record reflects a high degree of nuclear industry expertise and of industry responsibility toward the well-being of current and future generations. Accumulating

  14. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  15. When Safe Oral Feeding Is Threatened: End-of-Life Options and Decisions

    Science.gov (United States)

    Groher, Michael E.; Groher, Tammy Peutz

    2012-01-01

    Managing one's dysphagia at the end-of-life is challenging for the patient and the medical care team. Decisions surrounding oral feeding safety and the use of artificially administered hydration and nutrition require the medical care team to provide its best advice, taking into consideration the patient's health-related goals and the impact the…

  16. Anesthetic implication of tricuspid valve replacement in a patient with acute intermittent porphyria

    Directory of Open Access Journals (Sweden)

    Kianoush Saberi

    2016-01-01

    Full Text Available Facing a patient with acute intermittent porphyria (AIP, there is narrow safety margin which circumscribe all the therapeutic actions including choice of drugs. This would become even more complicated when it comes to a stressful and drug-dependent process like a cardiopulmonary bypass. According to author′s researches, no specific AIP case of tricuspid valve (TV replacement is reported recently. Furthermore, fast-track anesthesia was safely used in this 37-year-old male known the case of AIP, who was a candidate for TV replacement and removing the port catheter. The patient was extubated subsequently, only 3 h after entering the Intensive Care Unit.

  17. Devoluming and stabilizing method for end piece

    International Nuclear Information System (INIS)

    Ikeda, Satoshi; Shiotsuki, Msao; Kawamura, Shigeyoshi; Komatsu, Fumiaki.

    1991-01-01

    As a first method, end pieces and other radioactive metal wastes are filled as a mixture in a vessel, and preliminary compression is conducted. Then, the bulk density of the radioactive metal wastes is reduced and gaps in the end pieces are filled with radioactive metal wastes. If they are applied with heat treatment under high pressure in this state together with the vessel, they are devolumed and stabilized without damaging the vessel. As a second method, metal powders are mixed and filled in the vessel together with the end pieces. The gaps in the end pieces are filled with the metal powders and if they are applied with heat treatment under high pressure in this state together with the vessel, the end pieces are devolumed and stabilized without damaging the vessel in the same manner. This can devolume and stabilize the end pieces separated from nuclear fuel assemblies easily and safely. (T.M.)

  18. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1990-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. The methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and is expected to continue operation for at least and additional 25 years. Aging evaluations are in progress to address additional replacements that may be needed during this period

  19. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1989-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. Methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and will continue operation for perhaps another 20 years. Aging evaluations are in program to address additional replacements that may be needed during this extended time period. 3 figs

  20. Choosing and Using Safe Water Technologies: Evidence from a Field Experiment in Kenya

    OpenAIRE

    Luoto, Jill Emily

    2010-01-01

    This dissertation examines the decision-making of poor rural Kenyan households with respect to the adoption of point-of-use (POU) safe water technologies designed to expand access to safe drinking water in the developing world. Low-cost POU products such as chlorine and filters substantially reduce diarrhea, which kills two million children in poor countries each year. Nevertheless, POU products remain little used in many parts of the developing world, even when they are widely available at s...

  1. End-of-life dreams and visions: a longitudinal study of hospice patients' experiences.

    Science.gov (United States)

    Kerr, Christopher W; Donnelly, James P; Wright, Scott T; Kuszczak, Sarah M; Banas, Anne; Grant, Pei C; Luczkiewicz, Debra L

    2014-03-01

    End-of-life dreams and visions (ELDVs) have been well documented throughout history and across cultures. The impact of pre-death experiences on dying individuals and their loved ones can be profoundly meaningful. Our aim was to quantify the frequency of dreams/visions experienced by patients nearing the end of life, examine the content and subjective significance of the dreams/visions, and explore the relationship of these factors to time/proximity to death. This mixed-methods study surveyed patients in a hospice inpatient unit using a semi-structured interview. Sixty-six patients admitted to a hospice inpatient unit between January 2011 and July 2012 provided informed consent and participated in the study. The semi-structured interviews contained closed and open-ended questions regarding the content, frequency, and comfort/distress of dreams/visions. Fifty-nine participants comprised the final sample. Most participants reported experiencing at least one dream/vision. Almost half of the dreams/visions occurred while asleep, and nearly all patients indicated that they felt real. The most common dreams/visions included deceased friends/relatives and living friends/relatives. Dreams/visions featuring the deceased (friends, relatives, and animals/pets) were significantly more comforting than those of the living, living and deceased combined, and other people and experiences. As participants approached death, comforting dreams/visions of the deceased became more prevalent. ELDVs are commonly experienced phenomena during the dying process, characterized by a consistent sense of realism and marked emotional significance. These dreams/visions may be a profound source of potential meaning and comfort for the dying, and therefore warrant clinical attention and further research.

  2. Failure rate of cemented and uncemented total hip replacements

    DEFF Research Database (Denmark)

    Makela, K. T.; Matilainen, M.; Pulkkinen, P.

    2014-01-01

    ). Participants 347 899 total hip replacements performed during 1995-2011. Main outcome measures Probability of implant survival (Kaplan-Meier analysis) along with implant survival with revision for any reason as endpoint (Cox multiple regression) adjusted for age, sex, and diagnosis in age groups 55-64, 65......Objective To assess the failure rate of cemented, uncemented, hybrid, and reverse hybrid total hip replacements in patients aged 55 years or older. Design Register study. Setting Nordic Arthroplasty Register Association database (combined data from Sweden, Norway, Denmark, and Finland......-74, and 75 years or older. Results The proportion of total hip replacements using uncemented implants increased rapidly towards the end of the study period. The 10 year survival of cemented implants in patients aged 65 to 74 and 75 or older (93.8%, 95% confidence interval 93.6% to 94.0% and 95.9%, 95...

  3. Thrombocytopenia after aortic valve replacement with freedom solo bioprosthesis: a propensity study.

    Science.gov (United States)

    Piccardo, Alessandro; Rusinaru, Dan; Petitprez, Benoit; Marticho, Paul; Vaida, Ioana; Tribouilloy, Christophe; Caus, Thierry

    2010-05-01

    The incidence of postoperative thrombocytopenia after aortic valve replacement with the Freedom Solo bioprosthesis remains unclear. This propensity-matched study was carried out to evaluate the incidence and clinical impact of thrombocytopenia in patients receiving the Freedom Solo bioprosthesis. Patients who underwent aortic valve replacement with a Freedom Solo or Carpentier-Edwards Perimount pericardial prosthesis at our institution between 2006 and 2008 were screened retrospectively. Exclusion criteria included double valve replacement, redo surgery, and active endocarditis. Two hundred six patients were considered eligible for this analysis. Using propensity scores 36 matched pairs of patients with a Freedom Solo or Perimount bioprosthesis were obtained. The primary end point was the occurrence of postoperative thrombocytopenia. Secondary end points were postoperative thromboembolic or hemorrhagic events and 30-day mortality. Before matching, severe thrombocytopenia (Solo bioprosthesis and 1% with a Perimount bioprosthesis (p Solo (p Solo and Perimount bioprostheses, respectively (p Solo implantation. However, this complication was not related to any deleterious events in our study population. Copyright (c) 2010 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  4. The beginning of the end for chimpanzee experiments?

    Science.gov (United States)

    2008-01-01

    The advanced sensory, psychological and social abilities of chimpanzees confer upon them a profound ability to suffer when born into unnatural captive environments, or captured from the wild – as many older research chimpanzees once were – and when subsequently subjected to confinement, social disruption, and involuntary participation in potentially harmful biomedical research. Justifications for such research depend primarily on the important contributions advocates claim it has made toward medical advancements. However, a recent large-scale systematic review indicates that invasive chimpanzee experiments rarely provide benefits in excess of their profound animal welfare, bioethical and financial costs. The approval of large numbers of these experiments – particularly within the US – therefore indicates a failure of the ethics committee system. By 2008, legislative or policy bans or restrictions on invasive great ape experimentation existed in seven European countries, Japan, Australia and New Zealand. In continuing to conduct such experiments on chimpanzees and other great apes, the US was almost completely isolated internationally. In 2007, however, the US National Institutes of Health National Center for Research Resources implemented a permanent funding moratorium on chimpanzee breeding, which is expected to result in a major decline in laboratory chimpanzee numbers over the next 30 years, as most are retired or die. Additionally, in 2008, The Great Ape Protection Act was introduced to Congress. The bill proposed to end invasive research and testing on an estimated 1,200 chimpanzees confined within US laboratories, and, for approximately 600 federally-owned, to ensure their permanent retirement to sanctuaries. These events have created an unprecedented opportunity for US legislators, researchers, and others, to consider a global ban on invasive chimpanzee research. Such a ban would not only uphold the best interests of chimpanzees, and other research

  5. Landscape planning for a safe city

    Directory of Open Access Journals (Sweden)

    M. Ishikawa

    2002-06-01

    Full Text Available To create a safe city free from natural disasters has been one of the important criteria in city planning. Since large cities have suffered from large fires caused by earthquakes, the planning of open spaces to prevent the spread of fires is part of the basic structure of city planning in Japan. Even in the feudal city of Edo, the former name of Tokyo, there had been open spaces to prevent fire disasters along canals and rivers. This paper discusses the historical evolution of open space planning, that we call landscape planning, through the experiences in Tokyo, and clarifies the characteristics and problems for achieving a safe city.

  6. Development of an Intrinsic Continuum Robot and Attitude Estimation of Its End-effector Based on a Kalman Filter

    International Nuclear Information System (INIS)

    Kang, Chang Hyun; Bae, Ji Hwan; Kang, Bong Soo

    2015-01-01

    This paper presents the design concept of an intrinsic continuum robot for safe man-machine interface and characteristic behaviors of its end-effector based on real experiments. Since pneumatic artificial muscles having similar antagonistic actuation to human muscles are used for main backbones of the proposed robot as well as in the role of the actuating devices, variable stiffness of robotic joints can be available in the actual environment. In order to solve the inherent shortcoming of an intrinsic continuum robot due to bending motion of the backbone materials, a Kalman filter scheme based on a triaxial accelerometer and a triaxial gyroscope was proposed to conduct an attitude estimation of the end-effector of the robot. The experimental results verified that the proposed method was effective in estimating the attitude of the end-effector of the intrinsic continuum robot

  7. Development of an Intrinsic Continuum Robot and Attitude Estimation of Its End-effector Based on a Kalman Filter

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Chang Hyun; Bae, Ji Hwan; Kang, Bong Soo [Hannam University, Daejeon (Korea, Republic of)

    2015-04-15

    This paper presents the design concept of an intrinsic continuum robot for safe man-machine interface and characteristic behaviors of its end-effector based on real experiments. Since pneumatic artificial muscles having similar antagonistic actuation to human muscles are used for main backbones of the proposed robot as well as in the role of the actuating devices, variable stiffness of robotic joints can be available in the actual environment. In order to solve the inherent shortcoming of an intrinsic continuum robot due to bending motion of the backbone materials, a Kalman filter scheme based on a triaxial accelerometer and a triaxial gyroscope was proposed to conduct an attitude estimation of the end-effector of the robot. The experimental results verified that the proposed method was effective in estimating the attitude of the end-effector of the intrinsic continuum robot.

  8. Incidence and outcome of patients starting renal replacement therapy for end-stage renal disease due to multiple myeloma or light-chain deposit disease: an ERA-EDTA Registry study

    DEFF Research Database (Denmark)

    Tsakiris, D.J.; Stel, V.S.; Finne, P.

    2010-01-01

    Background. Information on demographics and survival of patients starting renal replacement therapy (RRT) for end-stage renal disease (ESRD) due to multiple myeloma (MM) or light-chain deposit disease (LCDD) is scarce. The aim of this study was to describe the incidence, characteristics, causes...... causes (non-MM) was observed overtime. Patient survival on RRT was examined, unadjusted and adjusted for age and gender. Results. Of the 159 637 patients on RRT, 2453 (1.54%) had MM or LCDD. The incidence of RRT for ESRD due to MM or LCDD, adjusted for age and gender, increased from 0.70 pmp in 1986...

  9. Novice Nurses' Experiences With Palliative and End-of-Life Communication.

    Science.gov (United States)

    Hendricks-Ferguson, Verna L; Sawin, Kathleen J; Montgomery, Kitty; Dupree, Claretta; Phillips-Salimi, Celeste R; Carr, Barb; Haase, Joan E

    2015-01-01

    Health care providers recognize that delivery of effective communication with family members of children with life-threatening illnesses is essential to palliative and end-of-life care (PC/EOL). Parents value the presence of nurses during PC/EOL of their dying child. It is vital that nurses, regardless of their years of work experience, are competent and feel comfortable engaging family members of dying children in PC/EOL discussions. This qualitative-descriptive study used focus groups to explore the PC/EOL communication perspectives of 14 novice pediatric oncology nurses (eg, with less than 1 year of experience). Audio-taped focus group discussions were reviewed to develop the following 6 theme categories: (a) Sacred Trust to Care for the Child and Family, (b) An Elephant in the Room, (c) Struggling with Emotional Unknowns, (d) Kaleidoscope of Death: Patterns and Complexity, (e) Training Wheels for Connectedness: Critical Mentors during PC/EOL of Children, and (f) Being Present with an Open Heart: Ways to Maintain Hope and Minimize Emotional Distress. To date, this is the first study to focus on PC/EOL communication perspectives of novice pediatric oncology nurses. © 2015 by Association of Pediatric Hematology/Oncology Nurses.

  10. 76 FR 12719 - Safe Schools/Healthy Students Program; Office of Safe and Drug-Free Schools; Safe Schools/Healthy...

    Science.gov (United States)

    2011-03-08

    ... DEPARTMENT OF EDUCATION Safe Schools/Healthy Students Program; Office of Safe and Drug- Free Schools; Safe Schools/Healthy Students Program; Catalog of Federal Domestic Assistance (CFDA) Numbers: 84... priorities, requirements, and definitions under the Safe Schools/Healthy Students (SS/HS) program. Since...

  11. "It makes us really look inferior to outsiders": Coping with psychosocial experiences associated with the lack of access to safe water and sanitation.

    Science.gov (United States)

    Bisung, Elijah; Elliott, Susan J

    2017-11-09

    This paper explores daily experiences and coping resources related to the lack of access to safe water and adequate sanitation in Usoma, a lakeshore community in Western Kenya. A qualitative approach that involved 10 focus group discussions and 9 key informant interviews with community leaders, volunteers and professionals was used to explore the research objectives. Data were collected from June to August 2013. Daily practices and experiences around water and sanitation, such as water collection, open defecation and shared toilets, were a major concern to residents. In the absence of safe water, residents used social networks and support, financial resources and the nearby Lake Victoria as coping resources. Findings from this study are important for mobilizing resources in vulnerable settings as a first step towards designing community-based interventions. For public health practice, practitioners must work with - and collaborate across - sectors to enhance and strengthen social networks and cohesion, and protect the natural environment while working toward addressing water-related challenges in deprived settings.

  12. The lived experience of family caregivers who provided end-of-life care to persons with advanced dementia.

    Science.gov (United States)

    Peacock, Shelley; Duggleby, Wendy; Koop, Priscilla

    2014-04-01

    Dementia is a terminal illness, and family caregivers play a vital role in providing end-of-life care to their relative. The present study begins to address the paucity of research regarding end-of-life caregiving experience with dementia. This study utilized Munhall's methodology for interpretive phenomenology. Seven women and four men were interviewed two to three times within a year of their relative's death; interviews were transcribed verbatim and hermeneutically analyzed. Findings reveal two essential aspects of end-of-life dementia caregiving: being-with and being-there. Further findings are organized according to the existential life worlds. Examination of the life worlds demonstrates that 1) spatiality provided a sense or lack of feeling welcome to provide end-of-life care; 2) temporality was an eternity or time melting away quickly, or the right or wrong time to die; 3) corporeality revealed feelings of exhaustion; and 4) relationality was felt as a closeness to others or in tension-filled relationships. An understanding from bereaved caregivers' perspectives will help healthcare practitioners better support and empathize with family caregivers. Further research is warranted that focuses on other places of death and differences in experience based on gender or relationship to the care receiver.

  13. Three steam generator replacement projects in 1995: Consortium Siemens Framatome is well prepared to contribute its experience to the SGR at the Krsko NPP

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S.A. joined their experience and efforts in the field of steam generators replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 2. Further projects will follow in 1996, i.e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  14. Process and device for in situ replacing sealing faces in large valves

    International Nuclear Information System (INIS)

    Francois, M.; Garit, J.; Mantes, G.

    1995-01-01

    A milling machine is fitted in the interior of the valve and first machines the sealing face of the opposite seat of the seat to be replaced so that this face can act as a reference for the tool and then machines out the seat ending up by machining a new recess for the replacement seat which is then inserted in position and fixed to the body of the valve by a circular welded joint. 23 figs

  15. Mitral-valve repair versus replacement for severe ischemic mitral regurgitation.

    Science.gov (United States)

    Acker, Michael A; Parides, Michael K; Perrault, Louis P; Moskowitz, Alan J; Gelijns, Annetine C; Voisine, Pierre; Smith, Peter K; Hung, Judy W; Blackstone, Eugene H; Puskas, John D; Argenziano, Michael; Gammie, James S; Mack, Michael; Ascheim, Deborah D; Bagiella, Emilia; Moquete, Ellen G; Ferguson, T Bruce; Horvath, Keith A; Geller, Nancy L; Miller, Marissa A; Woo, Y Joseph; D'Alessandro, David A; Ailawadi, Gorav; Dagenais, Francois; Gardner, Timothy J; O'Gara, Patrick T; Michler, Robert E; Kron, Irving L

    2014-01-02

    Ischemic mitral regurgitation is associated with a substantial risk of death. Practice guidelines recommend surgery for patients with a severe form of this condition but acknowledge that the supporting evidence for repair or replacement is limited. We randomly assigned 251 patients with severe ischemic mitral regurgitation to undergo either mitral-valve repair or chordal-sparing replacement in order to evaluate efficacy and safety. The primary end point was the left ventricular end-systolic volume index (LVESVI) at 12 months, as assessed with the use of a Wilcoxon rank-sum test in which deaths were categorized below the lowest LVESVI rank. At 12 months, the mean LVESVI among surviving patients was 54.6±25.0 ml per square meter of body-surface area in the repair group and 60.7±31.5 ml per square meter in the replacement group (mean change from baseline, -6.6 and -6.8 ml per square meter, respectively). The rate of death was 14.3% in the repair group and 17.6% in the replacement group (hazard ratio with repair, 0.79; 95% confidence interval, 0.42 to 1.47; P=0.45 by the log-rank test). There was no significant between-group difference in LVESVI after adjustment for death (z score, 1.33; P=0.18). The rate of moderate or severe recurrence of mitral regurgitation at 12 months was higher in the repair group than in the replacement group (32.6% vs. 2.3%, P<0.001). There were no significant between-group differences in the rate of a composite of major adverse cardiac or cerebrovascular events, in functional status, or in quality of life at 12 months. We observed no significant difference in left ventricular reverse remodeling or survival at 12 months between patients who underwent mitral-valve repair and those who underwent mitral-valve replacement. Replacement provided a more durable correction of mitral regurgitation, but there was no significant between-group difference in clinical outcomes. (Funded by the National Institutes of Health and the Canadian Institutes of

  16. Is lumbosacral plexus blockade effective and safe for surgical anesthesia in total hip replacement?

    DEFF Research Database (Denmark)

    Nielsen, Niels Dalsgaard; Larsen, Jens Rolighed; Børglum, Jens

    Background and Aims Patients scheduled for total hip replacement often presents cardiovascular comorbidity, which increases perioperative risk of complications. This pilot study aimed to compare lumbosacral plexus blockade with continuous and single-dose spinal anesthesia for surgical anesthesia...... had lumbosacral plexus blockade (lumbar plexus block, sacral plexus block and fascia transversalis plane block) with ropivacaine. Group 2 had continuous spinal anesthesia with repeated bupivacaine-doses. Group 3 had single-dose spinal anesthesia with bupivacaine. Hemodynamic data were recorded during...... vascular resistance, and arterial and central venous pressures. (table 1) No patients in group 1 achieved complete surgical anesthesia due to lack of anesthesia of the cranial part of the surgical incision. Conclusions Neither lumbosacral plexus block nor continuous spinal anesthesia affected any...

  17. Mortality risk disparities in children receiving chronic renal replacement therapy for the treatment of end-stage renal disease across Europe

    DEFF Research Database (Denmark)

    Chesnaye, Nicholas C; Schaefer, Franz; Bonthuis, Marjolein

    2017-01-01

    HR) and the explained variation were modelled for patient-level and country-level factors with multilevel Cox regression. The primary outcome studied was all-cause mortality while on renal replacement therapy. FINDINGS: Between Jan 1, 2000, and Dec 31, 2013, the overall 5 year renal replacement therapy mortality rate......BACKGROUND: We explored the variation in country mortality rates in the paediatric population receiving renal replacement therapy across Europe, and estimated how much of this variation could be explained by patient-level and country-level factors. METHODS: In this registry analysis, we extracted...... patient data from the European Society for Paediatric Nephrology/European Renal Association-European Dialysis and Transplant Association (ESPN/ERA-EDTA) Registry for 32 European countries. We included incident patients younger than 19 years receiving renal replacement therapy. Adjusted hazard ratios (a...

  18. Users’ Perceptions Using Low-End and High-End Mobile-Rendered HMDs: A Comparative Study

    Directory of Open Access Journals (Sweden)

    M.-Carmen Juan

    2018-02-01

    Full Text Available Currently, it is possible to combine Mobile-Rendered Head-Mounted Displays (MR HMDs with smartphones to have Augmented Reality platforms. The differences between these types of platforms can affect the user’s experiences and satisfaction. This paper presents a study that analyses the user’s perception when using the same Augmented Reality app with two MR HMD (low-end and high-end. Our study evaluates the user’s experience taking into account several factors (control, sensory, distraction, ergonomics and realism. An Augmalpha-lowerented Reality app was developed to carry out the comparison for two MR HMDs. The application had exactly the same visual appearance and functionality for both devices. Forty adults participated in our study. From the results, there were no statistically significant differences for the users’ experience for the different factors when using the two MR HMDs, except for the ergonomic factors in favour of the high-end MR HMD. Even though the scores for the high-end MR HMD were higher in nearly all of the questions, both MR HMDs provided a very satisfying viewing experience with very high scores. The results were independent of gender and age. The participants rated the high-end MR HMD as the best one. Nevertheless, when they were asked which MR HMD they would buy, the participants chose the low-end MR HMD taking into account its price.

  19. The trajectory of experience of critical care nurses in providing end-of-life care: A qualitative descriptive study.

    Science.gov (United States)

    Ong, Keh Kiong; Ting, Kit Cheng; Chow, Yeow Leng

    2018-01-01

    To understand the perceptions of critical care nurses towards providing end-of-life care. There has been an increasing interest in end-of-life care in the critical care setting. In Singapore, approximately half of deaths in the hospital occur during critical care. While nurses are well positioned to provide end-of-life care to patients and their family members, they faced barriers to providing end-of-life care. Also, providing end-of-life care has profound positive and negative psychological effects on nurses, with the latter being more prominent. Qualitative descriptive design. Data collection was performed in a medical intensive care unit of a public tertiary hospital in Singapore. Ten registered nurses were purposively sampled and interviewed individually using a semi-structured interview guide. A codebook was developed to guide coding, and data were thematically analysed. Rigour was maintained. Nurses went through a trajectory of experience. They experienced the culture of care and developed dissatisfaction with it. The tension shaped their perception and meaning of life and death, and they developed mechanisms to reach resolution. This study provides insight on nurses' perception as a trajectory of experience and raised several implications on clinical practice, policy and research. There is a need to alleviate the tension nurses face and to facilitate coming to terms with the tension by improving the culture of care and supporting nurses. Nurses could be involved more in decision-making and empowered to start end-of-life care conversations within the team and with family members. Communication with family members and between nurses and doctors could be improved. Support for nurses providing end-of-life care could be enhanced through promoting social networks, education and bereavement support. Further research is needed to explore ways to support and empower nurses to provide end-of-life care in critical care. © 2017 John Wiley & Sons Ltd.

  20. First reported experience with intramuscular diaphragm pacing in replacing positive pressure mechanical ventilators in children.

    Science.gov (United States)

    Onders, Raymond P; Ponsky, Todd A; Elmo, MaryJo; Lidsky, Karen; Barksdale, Edward

    2011-01-01

    Diaphragm pacing (DP) has been shown to successfully replace mechanical ventilators for adult tetraplegic patients with chronic respiratory insufficiency. This is the first report of DP in ventilator-dependent children. This was a prospective interventional experience under institutional review board approval. Diaphragm pacing involves outpatient laparoscopic diaphragm motor point mapping to identify the site where stimulation causes maximum diaphragm contraction with implantation of 4 percutaneous intramuscular electrodes. Diaphragm conditioning ensues to wean the child from the ventilator. Six children were successfully implanted ranging from 5 to 17 years old with the smallest 15 kg in weight. Length of time on mechanical ventilation ranged from 11 days to 7.6 years with an average of 3.2 years. In all patients, DP provided tidal volumes above basal needs. Five of the patients underwent a home-based weaning program, whereas one patient who was implanted only 11 days post spinal cord injury never returned to the ventilator with DP use. Another patient was weaned from the ventilator full time but died of complications of his underlying brain stem tumor. The remaining patients weaned from the ventilator for over 14 hours a day and/or are actively conditioning their diaphragms. Diaphragm pacing successfully replaced mechanical ventilators, which improves quality of life. Copyright © 2011 Elsevier Inc. All rights reserved.

  1. Nurses' Experiences of End-of-life Photography in NICU Bereavement Support.

    Science.gov (United States)

    Martel, Sara; Ives-Baine, Lori

    2018-06-07

    To qualitatively explore neonatal intensive care nurses' experiences with end-of-life photography as part of their bereavement support work with families. An Interpretive Phenomenological Analysis with data collected through a focus group (n = 6) and one semi-structured interview (n = 1) with neonatal nurses from a Level 3/4 NICU in a Canadian pediatric hospital. Participants' comfort with EOL photography developed over time through exposure to bereavement scenarios and positive experiences with families. Participants' experienced a feeling of pressure to balance the photography with clinical responsibilities and find the right time to introduce photography while being sensitive to family experiences. Participants experienced EOL photography as something tangible to give families and were satisfied knowing the images might play an important role in the family's healing after the NICU. All participants had come to value EOL photography as a positive and meaningful part of their work with bereaved families. Identified challenges related to balancing the practice with the unpredictable flow and demands of critical care and to developing an appreciation for and comfort with the photography as part of their healing and the families' healing. Findings contribute insight into care-provider experience that can inform best practices, training, and staff support for palliative and bereavement work in neonatal and pediatric settings. The findings suggest a need to support nurses emotionally and clinically in carrying out this photography as part of their care for families. Copyright © 2018 Elsevier Inc. All rights reserved.

  2. Decision-Making of Patients With Implantable Cardioverter-Defibrillators at End of Life: Family Members' Experiences.

    Science.gov (United States)

    Lee, Mei Ching; Sulmasy, Daniel P; Gallo, Joseph; Kub, Joan; Hughes, Mark T; Russell, Stuart; Kellogg, Anela; Owens, Sharon G; Terry, Peter; Nolan, Marie T

    2017-07-01

    Many patients with advanced heart failure (HF) experience the life-extending benefits of implantable cardioverter-defibrillators (ICD), but at the end stage of HF, patients may experience shocks with increasing frequency and change the plan for end-of-life (EOL) care including the deactivation of the ICD. This report describes family members' experiences of patients with ICD making decisions at EOL. Understanding the decision-making of patients with ICD at EOL can promote informed decision-making and improve the quality of EOL care. This pilot study used a mixed methods approach to test the effects of a nurse-guided discussion in decision-making about ICD deactivation (turning off the defibrillation function) at the EOL. Interviews were conducted, audiotaped, and transcribed in 2012 to 2013 with 6 family members of patients with advanced HF and ICDs. Three researchers coded the data and identified themes in 2014. Three main themes described family members' experiences related to patients having HF with ICDs making health-care decision at EOL: decision-making preferences, patients' perception on ICD deactivation, and communication methods. Health-care providers need to have knowledge of patients' decision-making preferences. Preferences for decision-making include the allowing of appropriate people to involve and encourages direct conversation with family members even when advance directives is completed. Information of ICD function and the option of deactivation need to be clearly delivered to patients and family members. Education and guidelines will facilitate the communication of the preferences of EOL care.

  3. Cool and Safe: Multiplicity in Safe Innovation at Unilever

    Science.gov (United States)

    Penders, Bart

    2011-01-01

    This article presents the making of a safe innovation: the application of ice structuring protein (ISP) in edible ices. It argues that safety is not the absence of risk but is an active accomplishment; innovations are not "made safe afterward" but "safe innovations are made". Furthermore, there are multiple safeties to be accomplished in the…

  4. Safe Space Oddity: Revisiting Critical Pedagogy

    Science.gov (United States)

    Redmond, Melissa

    2010-01-01

    Inspired by an incident in a social work graduate classroom in which she was a teaching assistant, the author reflects on her commitment to constructivist teaching methods, critical theory, and critical pedagogy. Exploring the educational utility of notions such as public space and safe space, the author employs this personal experience to examine…

  5. Arthroscopic treatment of patients with moderate arthrofibrosis after total knee replacement.

    Science.gov (United States)

    Jerosch, Joerg; Aldawoudy, Akram M

    2007-01-01

    The purpose of this study was to document the effect of arthroscopic management in patients with knee stiffness after total knee replacement. We present a case series study, in which 32 patients have been treated for moderate arthrofibrosis of the knee after total knee replacement, with the same regimen. We have excluded all cases of stiffness, because of infection, mechanical mal-alignment, loosening of the implants and other obvious reasons of stiffness of the knee, rather than pure arthrofibrosis. All patients first underwent a trial of conservative treatment before going for arthroscopic management. A pain catheter for femoral nerve block was inserted just before anesthesia for post-operative pain management. Arthroscopic arthrolysis of the intra-articular pathology was performed in a standardized technique with release of all fibrous bands in the suprapatellar pouch, reestablishing the medial and lateral gutter, release of the patella, resection of the remaining meniscal tissue or an anterior cyclops, if needed. Intensive physiotherapy and continuous passive motion were to start immediately post-operatively. All the patients were available for the follow up and they were evaluated using the knee society rating system. A total of 25 of the 32 procedures resulted in an improvement of the patients knee score. All the knees operated upon had intra-articular fibrous bands, hypertrophic synovitis and peri-patellar adhesions. A total of eight patients suffered from an anterior cyclops lesion and six patients showed pseudomenicus. In 19 cases a medial and lateral relapse of the patella was performed; only 5 patients got an isolated lateral release. The mean knee flexion was 119 degrees (100-130) at the end of arthroscopy and was 97 degrees (75-115) at the last follow up. The eight patients with extension lags decreased from 27 degrees (10 degrees-35 degrees) pre-operatively to 4 degrees (0-10) at time of follow up. The average knee society ratings increased from 70

  6. Radiation control report on intermediate heat exchanger replacement and related works

    International Nuclear Information System (INIS)

    Kanou, Y.; Yamanaka, T.; Sasajima, T.; Hoshiba, H.; Emori, S.; Shindou, K.

    2002-03-01

    The 13th periodical inspection of the experimental fast reactor JOYO is being made from Jun. 2000 to Jan. 2003. While this inspection, from the end of Oct. 2000 to Nov. 2001, the MK-III modification work on heat transport system was made in lower region of the reactor containment vessel in the reactor facility (under floor area). In the MK-III modification work, the works important to radiation control were the replacement of intermediate heat exchangers (IHXs) and fixtures, and the picking out of the surveillance material from primary heat transport piping carried out in the maintenance building. Because the working areas of these works were executed in small space around the complicated primary heat transport piping, workability was bad and dose rate from the corrosion products (CP) in piping or fixtures was high. In such condition, radiation control was performed mainly concerned about external exposure. The planted total external exposure of the IHX replacement and related works was 7135 man-mSv (target of total dose control: less than 5708 man-mSv, 80% of the plan), derived from special radiation work plants for segmental works, concerned about work procedure, number of workers, period of work, dose rate of working area and surface dose rate of equipments. The special radiation control organization was established for such long and large-scale work. The spatial organization held detailed discussion about radiation control of this work with the execution section and contractors appropriately, performance careful external/internal exposure control and surface contamination control and made efforts to reduce te external exposure thoroughly. As a result of these action, the total external exposure was 2386 man·mSv (≅33% of the plan, ≅42% of the target) and the maximum individual exposure were 24.7 mSv for staffs and 21.7mSv for contractors. The dose rate, surface contamination and air contamination while the works were kept under the control level with the

  7. Patients' perceptions of information and education for renal replacement therapy: an independent survey by the European Kidney Patients' Federation on information and support on renal replacement therapy

    NARCIS (Netherlands)

    van Biesen, Wim; van der Veer, Sabine N.; Murphey, Mark; Loblova, Olga; Davies, Simon

    2014-01-01

    Selection of an appropriate renal replacement modality is of utmost importance for patients with end stage renal disease. Previous studies showed provision of information to and free modality choice by patients to be suboptimal. Therefore, the European Kidney Patients' Federation (CEAPIR) explored

  8. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  9. Inherently safe reactors

    International Nuclear Information System (INIS)

    Maartensson, Anders

    1992-01-01

    A rethinking of nuclear reactor safety has created proposals for new designs based on inherent and passive safety principles. Diverging interpretations of these concepts can be found. This article reviews the key features of proposed advanced power reactors. An evaluation is made of the degree of inherent safety for four different designs: the AP-600, the PIUS, the MHTGR and the PRISM. The inherent hazards of today's most common reactor principles are used as reference for the evaluation. It is concluded that claims for the new designs being inherently, naturally or passively safe are not substantiated by experience. (author)

  10. Fifteen years of GH replacement improves body composition and cardiovascular risk factors.

    Science.gov (United States)

    Elbornsson, Mariam; Götherström, Galina; Bosæus, Ingvar; Bengtsson, Bengt-Åke; Johannsson, Gudmundur; Svensson, Johan

    2013-05-01

    Few studies have determined the effects of more than 5-10 years of GH replacement in adults on body composition and cardiovascular risk factors. In this prospective, single-center, open-label study, the effects of 15 years of GH replacement on body composition and cardiovascular risk factors were determined in 156 hypopituitary adults (93 men) with adult-onset GH deficiency (GHD). Mean age was 50.5 (range 22-74) years at study start. Body composition was measured using dual-energy X-ray absorptiometry. The mean initial GH dose of 0.55 (S.E.M. 0.03) mg/day was gradually lowered to 0.40 (0.01) mg/day after 15 years. The mean serum IGF1 SDS increased from -1.53 (0.10) at baseline to 0.74 (0.13) at study end (Plevel at study end (Pbody fat (BF) started to increase and had returned to the baseline level after 15 years. Serum levels of total cholesterol and LDL-cholesterol decreased and serum HDL-cholesterol level increased. Fasting plasma glucose increased from 4.4 (0.1) at baseline to 4.8 (0.1) mmol/l at study end (P<0.001). However, blood HbA1c decreased from 5.0 (0.1) to 4.6 (0.1) % (P<0.001). Fifteen-year GH replacement in GHD adults induced a transient decrease in BF and sustained improvements of LST and serum lipid profile. Fasting plasma glucose increased whereas blood HbA1c was reduced.

  11. From unwanted pregnancy to safe abortion: Sharing information about abortion in Asia through animation.

    Science.gov (United States)

    Krishnan, Shweta; Dalvie, Suchitra

    2015-05-01

    Although unsafe abortion continues to be a leading cause of maternal mortality in many countries in Asia, the right to safe abortion remains highly stigmatized across the region. The Asia Safe Abortion Partnership, a regional network advocating for safe abortion, produced an animated short film entitled From Unwanted Pregnancy to Safe Abortion to show in conferences, schools and meetings in order to share knowledge about the barriers to safe abortion in Asia and to facilitate conversations on the right to safe abortion. This paper describes the making of this film, its objectives, content, dissemination and how it has been used. Our experience highlights the advantages of using animated films in addressing highly politicized and sensitive issues like abortion. Animation helped to create powerful advocacy material that does not homogenize the experiences of women across a diverse region, and at the same time emphasize the need for joint activities that express solidarity. Copyright © 2015. Published by Elsevier Ltd.

  12. New coil end design for the RHIC Arc dipole

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, G.H.; Morgillo, A.; Power, K.; Thompson, P.

    1994-06-01

    To simplify production, the number of parts in the ends, about 64 in each coil end, was reduced by using thicker spacers between the turns, to about 23. A new computer program was written which gives a description of each turn closely resembling the turn as made. The output of this program is processed by newly written computer programs which change the parts descriptions into forms which are used by a computer-controlled, 5-axis milling machine. The solid spacers replace spacers assembled from laminations and improve the fit as well. The parts will be molded during production. The calculated harmonic content of the ends is compared with measurements on the first magnets built with the new ends.

  13. New coil end design for the RHIC Arc dipole

    International Nuclear Information System (INIS)

    Morgan, G.H.; Morgillo, A.; Power, K.; Thompson, P.

    1994-01-01

    To simplify production, the number of parts in the ends, about 64 in each coil end, was reduced by using thicker spacers between the turns, to about 23. A new computer program was written which gives a description of each turn closely resembling the turn as made. The output of this program is processed by newly written computer programs which change the parts descriptions into forms which are used by a computer-controlled, 5-axis milling machine. The solid spacers replace spacers assembled from laminations and improve the fit as well. The parts will be molded during production. The calculated harmonic content of the ends is compared with measurements on the first magnets built with the new ends

  14. A protocol for hit and control synchronous transfer for the front-end electronics at the CBM experiment

    Energy Technology Data Exchange (ETDEWEB)

    Kasinski, K., E-mail: kasinski@agh.edu.pl [AGH University of Science and Technology, Department of Measurement and Electronics, Av. Mickiewicza 30, 30-059 Cracow (Poland); Szczygiel, R. [AGH University of Science and Technology, Department of Measurement and Electronics, Av. Mickiewicza 30, 30-059 Cracow (Poland); Zabolotny, W. [Institute of Electronic Systems, Warsaw University of Technology, ul. Nowowiejska 15/19, 00-665 Warsaw (Poland); Lehnert, J.; Schmidt, C.J. [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Planckstrasse 1, 64-291 Darmstadt (Germany); Müller, W.F.J. [FAIR Facility for Antiproton and Ion Research in Europe GmbH, Planckstrasse 1, 64-291 Darmstadt (Germany)

    2016-11-01

    The Silicon Tracking System, Muon Chamber, Transition Radiation Detector and Time-Of-Flight among others are the detector systems of the Compressed Baryonic Matter (CBM) experiment at the FAIR facility. These detector systems will be built with tens of thousands of front-end ASICs exposed to high radiation doses and difficult environmental and interference conditions. A CERN's GBTx-based solution was chosen for combining data from multiple front-end ASICs into an optical link before further concentration and preprocessing in the common Data Processing Board data hub. This paper presents the protocol design addressing the DAQ system requirements, simplifying the ASIC's back-end design and presents its adaptation for the STS and MUCH detector's conditions. A specific link synchronization technique, hit data bandwidth optimization and time synchronization method for the self-triggered front-end chip are presented.

  15. A protocol for hit and control synchronous transfer for the front-end electronics at the CBM experiment

    International Nuclear Information System (INIS)

    Kasinski, K.; Szczygiel, R.; Zabolotny, W.; Lehnert, J.; Schmidt, C.J.; Müller, W.F.J.

    2016-01-01

    The Silicon Tracking System, Muon Chamber, Transition Radiation Detector and Time-Of-Flight among others are the detector systems of the Compressed Baryonic Matter (CBM) experiment at the FAIR facility. These detector systems will be built with tens of thousands of front-end ASICs exposed to high radiation doses and difficult environmental and interference conditions. A CERN's GBTx-based solution was chosen for combining data from multiple front-end ASICs into an optical link before further concentration and preprocessing in the common Data Processing Board data hub. This paper presents the protocol design addressing the DAQ system requirements, simplifying the ASIC's back-end design and presents its adaptation for the STS and MUCH detector's conditions. A specific link synchronization technique, hit data bandwidth optimization and time synchronization method for the self-triggered front-end chip are presented.

  16. Revisiting Sex Equality With Transcatheter Aortic Valve Replacement Outcomes: A Collaborative, Patient-Level Meta-Analysis of 11,310 Patients.

    Science.gov (United States)

    O'Connor, Stephen A; Morice, Marie-Claude; Gilard, Martine; Leon, Martin B; Webb, John G; Dvir, Danny; Rodés-Cabau, Josep; Tamburino, Corrado; Capodanno, Davide; D'Ascenzo, Fabrizio; Garot, Philippe; Chevalier, Bernard; Mikhail, Ghada W; Ludman, Peter F

    2015-07-21

    There has been conflicting clinical evidence as to the influence of female sex on outcomes after transcatheter aortic valve replacement. The aim of this study was to evaluate the impact of sex on early and late mortality and safety end points after transcatheter aortic valve replacement using a collaborative meta-analysis of patient-level data. From the MEDLINE, Embase, and the Cochrane Library databases, data were obtained from 5 studies, and a database containing individual patient-level time-to-event data was generated from the registry of each selected study. The primary outcome of interest was all-cause mortality. The safety end point was the combined 30-day safety end points of major vascular complications, bleeding events, and stroke, as defined by the Valve Academic Research Consortium when available. Five studies and their ongoing registry data, comprising 11,310 patients, were included. Women constituted 48.6% of the cohort and had fewer comorbidities than men. Women had a higher rate of major vascular complications (6.3% vs. 3.4%; p women and men (2.6 % vs. 2.2% [p = 0.24] and 6.5% vs. 6.5% [p = 0.93], respectively), but female sex was independently associated with improved survival at median follow-up of 387 days (interquartile range: 192 to 730 days) from the index procedure (adjusted hazard ratio: 0.79; 95% confidence interval: 0.73 to 0.86; p = 0.001). Although women experience more bleeding events, as well as vascular and stroke complications, female sex is an independent predictor of late survival after transcatheter aortic valve replacement. This should be taken into account during patient selection for this procedure. Copyright © 2015 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  17. The beginning of the end for chimpanzee experiments?

    Directory of Open Access Journals (Sweden)

    Knight Andrew

    2008-06-01

    Full Text Available Abstract The advanced sensory, psychological and social abilities of chimpanzees confer upon them a profound ability to suffer when born into unnatural captive environments, or captured from the wild – as many older research chimpanzees once were – and when subsequently subjected to confinement, social disruption, and involuntary participation in potentially harmful biomedical research. Justifications for such research depend primarily on the important contributions advocates claim it has made toward medical advancements. However, a recent large-scale systematic review indicates that invasive chimpanzee experiments rarely provide benefits in excess of their profound animal welfare, bioethical and financial costs. The approval of large numbers of these experiments – particularly within the US – therefore indicates a failure of the ethics committee system. By 2008, legislative or policy bans or restrictions on invasive great ape experimentation existed in seven European countries, Japan, Australia and New Zealand. In continuing to conduct such experiments on chimpanzees and other great apes, the US was almost completely isolated internationally. In 2007, however, the US National Institutes of Health National Center for Research Resources implemented a permanent funding moratorium on chimpanzee breeding, which is expected to result in a major decline in laboratory chimpanzee numbers over the next 30 years, as most are retired or die. Additionally, in 2008, The Great Ape Protection Act was introduced to Congress. The bill proposed to end invasive research and testing on an estimated 1,200 chimpanzees confined within US laboratories, and, for approximately 600 federally-owned, to ensure their permanent retirement to sanctuaries. These events have created an unprecedented opportunity for US legislators, researchers, and others, to consider a global ban on invasive chimpanzee research. Such a ban would not only uphold the best interests of

  18. The TOTEM front end driver, its components and applications in the TOTEM experiment

    OpenAIRE

    Antchev G; Aspell P; Barney D; Reynaud S; Snoeys W; Vichoudis P

    2007-01-01

    The TOTEM Front End Driver, so-called TOTFED, receives and handles trigger building and tracking data from the TOTEM detectors, and interfaces to the global trigger and data acquisition systems. The TOTFED is based on the VME64x standard and has deliberately been kept modular. It is very flexible and programmable to deal with the different TOTEM sub-detectors and possible evolution of the data treatment and trigger algorithms over the duration of the experiment. The main objectives for each u...

  19. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  20. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  1. Radiological and environmental safety in front-end fuel cycle facilities

    International Nuclear Information System (INIS)

    Puranik, V.D.

    2011-01-01

    The front end nuclear fuel cycle comprises of mining and processing of beach mineral sands along the southern coast of Kerala, Tamilnadu and Orissa, mining and processing of uranium ore in Singhbhum-East in Jharkhand and refining and fuel fabrication at Hyderabad. The Health Physics Units (HPUs)/Environmental Survey Laboratories (ESLs) set up at each site from inception of operation to carry out regular in-plant, personnel monitoring and environmental surveillance to ensure safe working conditions, evaluate radiation exposure of workers, ensure compliance with statutory norms, help in keeping the environmental releases well within the limits and advise appropriate control measures. This paper describes the occupational and environmental radiological safety measures associated with the operations of front end of nuclear fuel cycle. Radiological monitoring in these facilities is important to ensure safe working environment, protection of workers against exposure to radiation and comply with regulatory limits of exposure. The radiation exposure of workers in different units of the front end nuclear fuels cycle facilities operated by IREL, UCIL and NFC and environmental monitoring results are summarised in this paper

  2. NORTH END ROADLESS AREA, ARIZONA.

    Science.gov (United States)

    Drewes, Harald; Bigsby, P.R.

    1984-01-01

    Studies conducted in the North End Roadless Area, Arizona indicate probable or substantiated metallic mineral-resource potential in about one-fifth of the area. The area has potential for disseminated or stockwork-type molybdenum mineralization, copper-lead-zinc-silver veins, lead-zinc-silver limestone replacement deposits, and tungsten-bearing contact metamorphic skarn deposits. The area also contains cement rock and marble dimension stone, but has only slight promise for the occurrence of petroleum and natural gas.

  3. Waiting for a kidney transplant: the experience of patients with end-stage renal disease in South Korea.

    Science.gov (United States)

    Chong, Hye Jin; Kim, Hyun Kyung; Kim, Sung Reul; Lee, Sik

    2016-04-01

    To explore the experiences of Korean patients with end-stage renal disease awaiting kidney transplantation. The need for kidney transplantation has increased worldwide, while the number of kidney donors has not increased commensurately. This mismatch is a serious issue in South Korea. Prolonged waits for transplantation may cause physical and psychosocial issues and lead to poor outcomes. Nevertheless, the experience of waiting for kidney transplantation in South Korea has never been explored in depth. A qualitative descriptive design was used. The participants were eight patients diagnosed with end-stage renal disease on the waiting list for kidney transplantation in South Korea. Data were collected through individual in-depth interviews. All conversations during interviews were recorded and transcribed verbatim. Transcribed data were analysed using conventional content analysis. The experience of waiting for kidney transplantation consisted of six categories: (1) the light at the end of the tunnel, (2) being on call without any promise, (3) a tough tug of war between excitement and frustration, (4) doubts in the complexity, (5) A companion on the hard journey and (6) getting ready for D-day. Kidney transplantation candidates experience psychosocial difficulties and concerns while waiting for long periods of time without any assurance of resolution. Systematic education and psychosocial support from health care professionals and family members help patients get through what they describe as a difficult journey. Comprehensive management programs for kidney transplantation candidates are needed. Health care professionals need to recognise the psychosocial concerns of patients awaiting kidney transplantation. Clinicians should provide patients with information and support throughout the waiting period. © 2016 John Wiley & Sons Ltd.

  4. [Treatment of painful neuromas via end-to-side neurorraphy].

    Science.gov (United States)

    Aszmann, O C; Moser, V; Frey, M

    2010-08-01

    Management of the painful neuroma has been subject to controversy since the earliest descriptions of this disabling problem. Today, treatment is limited to resection of the neuroma and implantation of the nerve in a muscle at a location where it is safe from irritation and trauma. This however is not attainable in many cases and it is our clinical experience, that nerves without a target remain a source of constant discomfort and pain. Recently we reported of the feasibility of neuroma prevention through end-to-side neurorraphy into adjacent sensory and/or motor nerves to provide a target for axons deprived of their endorgan. Here we report of our first clinical experience with this method in sixteen patients with longstanding upper and lower extremity neuromas. 16 patients were included in this study. All had neuromas of different sensory nerves of both the upper and lower extremity. 11 were of iatrogenic origin, 5 were caused by different traumas. 8 had previous attempts to surgically treat the neuroma. Finally, all were treated by end-to-side neurorraphy into adjacent nerves. Postoperatively quantitative sensorymotor testing was performed to evaluate possible changes of nerve function of the recipient nerves. Pain was evaluated by visual analogue score and changes in pain medication. In no patient a sensory or motor deficit or painful sensations were induced in the target area of the recipient nerve. Some had dysaesthesias for about 6 months, which finally subsided. All but 1 patient improved in their symptoms at a follow-up of more than 2 years. Previous experimental work and present clinical results suggest that axons of a severed peripheral nerve that are provided with a pathway and target through an end-to-side coaptation will either be pruned or establish some type of end-organ contact so that a neuroma can be prevented without inducing sensory or motor dysfunctions in the recipient nerve. Georg Thieme Verlag KG Stuttgart New York.

  5. Engineering status of the superconducting end cap toroid magnets for the ATLAS experiment at LHC

    CERN Document Server

    Baynham, D Elwyn; Carr, F S; Courthold, M J D; Cragg, D A; Densham, C J; Evans, D; Holtom, E; Rochford, J; Sole, D; Towndrow, Edwin F; Warner, G P

    2000-01-01

    The ATLAS experiment at LHC, CERN will utilise a large, superconducting, air-cored toroid magnet system for precision muon measurements. The magnet system will consist of a long barrel and two end-cap toroids. Each end-cap toroid will contain eight racetrack coils mounted as a single cold mass in cryostat vessel of ~10 m diameter. The project has now moved from the design/specification stage into the fabrication phase. This paper presents the engineering status of the cold masses and vacuum vessels that are under fabrication in industry. Final designs of cold mass supports, cryogenic systems and control/protection systems are presented. Planning for toroid integration, test and installation is described. (3 refs).

  6. Multi-ligament instability after early dislocation of a primary total knee replacement - case report.

    Science.gov (United States)

    Sisak, Krisztian; Lloyd, John; Fiddian, Nick

    2011-01-01

    Peripheral nerve blocks have found increased popularity in providing prolonged post-operative analgesia following total knee replacement surgery. They generally provide effective analgesia with fewer complications than epidurals. This report describes an acute low-energy knee dislocation after a well balanced, fixed bearing, cruciate-retaining primary total knee replacement performed under a spinal anaesthetic with combined complimentary femoral and sciatic nerve blocks. The dislocation was not accompanied by neurovascular compromise. Due to the subsequent instability and injury to both collaterals, the posterior cruciate ligament and posterolateral corner structures, the knee was treated with a rotating-hinge revision total knee replacement. The dislocation occurred whilst the peripheral nerve blocks (PNB) were still working. We review our incidence of PNB related complications and conclude that PNB remain a safe and effective analgesia for total knee replacements. However, we advocate that ward staff and patients should be sufficiently educated to ensure that unaided post-operative mobilisation is prevented until such a time that patients have regained complete voluntary muscle control. Copyright © 2009 Elsevier B.V. All rights reserved.

  7. Application of GelGreen™ in Cesium Chloride Density Gradients for DNA-Stable Isotope Probing Experiments.

    Directory of Open Access Journals (Sweden)

    Jingfeng Gao

    Full Text Available In this study, GelGreen™ was investigated as a replacement for SYBR® Safe to stain DNA in cesium chloride (CsCl density gradients for DNA-stable isotope probing (SIP experiments. Using environmental DNA, the usage of GelGreen™ was optimized for sensitivity compared to SYBR® Safe, its optimal concentration, detection limit for environmental DNA and its application in environmental DNA-SIP assay. Results showed that GelGreen™ was more sensitive than SYBR® Safe, while the optimal dosage (15X concentration needed was approximately one-third of SYBR® Safe, suggesting that its sensitivity was three times more superior than SYBR® Safe. At these optimal parameters, the detection limit of GelGreen™-stained environmental DNA was as low as 0.2 μg, but the usage of 0.5 μg environmental DNA was recommended to produce a more consistent DNA band. In addition, a modified needle extraction procedure was developed to withdraw DNA effectively by fractionating CsCl density gradients into four or five fractions. The successful application of GelGreen™ staining with 13C-labeled DNA from enriched activated sludge suggests that this stain was an excellent alternative of SYBR® Safe in CsCl density gradients for DNA-SIP assays.

  8. Political Participation Online: The Replacement and the Mobilisation Hypotheses Revisited

    DEFF Research Database (Denmark)

    Jensen, Jakob Linaa

    2013-01-01

    This article discusses the state of political participation online more than ten years after the Internet’s great popular breakthrough as an everyday medium. Denmark is used as a case study to critically re-examine the frequently discussed replacement and mobilisation hypotheses on behalf of the ...... participation, efficacy and social capital seem to have less impact on online political participation. In the end, these findings are related to more overall discussions on the democratising potential of the Internet.......This article discusses the state of political participation online more than ten years after the Internet’s great popular breakthrough as an everyday medium. Denmark is used as a case study to critically re-examine the frequently discussed replacement and mobilisation hypotheses on behalf...... of the Internet. The pure replacement hypothesis is rejected. Instead, it is found that the Internet still supplements rather than replaces other media, even among heavy Internet users. The Internet is one among several media used by ‘media omnivores’, and political participation online supplements rather than...

  9. Nuclear equipment recalsification based on the service experience

    International Nuclear Information System (INIS)

    Geambasu, A.; Segarceanu, D.

    2000-01-01

    The paper presents some considerations concerning the need of comparison between equipment performance proven by test and the service experience in Cernavoda Nuclear Plant. Service performance dana obtain partly from service failures (failures times) and partly from service experience without failure (running times) can be statistically analyzed to obtain predictions of the number of failures of unfailed units in specified period of time, means time to first failure, means time of median failure, a.s.o. These informations can be used during the operation of Nuclear Power Plant to estimate when a equipment should be replaced with a new one in order to prevent getting to the life end point. (author)

  10. Preheating in an asymptotically safe quantum field theory

    DEFF Research Database (Denmark)

    Svendsen, Ole; Moghaddam, Hossein Bazrafshan; Brandenberger, Robert

    2016-01-01

    . High Energy Phys. 01 (2016) 081]. These theories allow for an inflationary phase in the very early universe. Inflation ends with a period of reheating. Since the models contain many scalar fields which are intrinsically coupled to the inflaton there is the possibility of parametric resonance...... fluctuations induced by the parametrically amplified entropy modes do not exceed the upper observational bounds puts a lower bound on the number of fields which the model followed in [D. F. Litim and F. Sannino, Asymptotic safety guaranteed, J. High Energy Phys. 12 (2014) 178; D. F. Litim, M. Mojaza, and F......We consider reheating in a class of asymptotically safe quantum field theories recently studied in [D. F. Litim and F. Sannino, Asymptotic safety guaranteed, J. High Energy Phys. 12 (2014) 178; D. F. Litim, M. Mojaza, and F. Sannino, Vacuum stability of asymptotically safe gauge-Yukawa theories, J...

  11. Environmentally friendly joining of tubes by their ends

    DEFF Research Database (Denmark)

    Silva, Carlos M.A.; Nielsen, Chris Valentin; Alves, Luis M.

    2015-01-01

    This paper proposes an environmentally friendly joining process for connecting tubes by their ends that has the potential to replace current solutions based on fastened, crimped, welded, brazed or adhesive bonded joints. The process is based on a new type of tubular lap joint produced by local...... of deformation and the process feasibility window, and destructive testing to establish the working limits of tubular lap joints under different type of loading conditions. Results demonstrate that the proposed joining process is a flexible and cost-effective technology for connecting tubes by their ends...

  12. SafeLand guidelines for landslide monitoring and early warning systems in Europe - Design and required technology

    Science.gov (United States)

    Bazin, S.

    2012-04-01

    decisions. The deliverable was compiled with contributions from experts on landslides, monitoring technologies, remote sensing, and social researchers from 16 European institutions. The deliverable addresses one of the main objectives of the SafeLand project, namely to merge experience and expert judgment and create synergies on European level towards guidelines for early warning and to make these results available to end-users and local stakeholders.

  13. Global and Local Page Replacement Algorithms on Virtual Memory Systems for Image Processing

    OpenAIRE

    WADA, Ben Tsutom

    1985-01-01

    Three virtual memory systems for image processing, different one another in frame allocation algorithms and page replacement algorithms, were examined experimentally upon their page-fault characteristics. The hypothesis, that global page replacement algorithms are susceptible to thrashing, held in the raster scan experiment, while it did not in another non raster-scan experiment. The results of the experiments may be useful also in making parallel image processors more efficient, while they a...

  14. Iron replacement therapy

    DEFF Research Database (Denmark)

    Nielsen, Ole Haagen; Coskun, Mehmet; Weiss, Günter

    2016-01-01

    PURPOSE OF REVIEW: Approximately, one-third of the world's population suffers from anemia, and at least half of these cases are because of iron deficiency. With the introduction of new intravenous iron preparations over the last decade, uncertainty has arisen when these compounds should...... be administered and under which circumstances oral therapy is still an appropriate and effective treatment. RECENT FINDINGS: Numerous guidelines are available, but none go into detail about therapeutic start and end points or how iron-deficiency anemia should be best treated depending on the underlying cause...... of iron deficiency or in regard to concomitant underlying or additional diseases. SUMMARY: The study points to major issues to be considered in revisions of future guidelines for the true optimal iron replacement therapy, including how to assess the need for treatment, when to start and when to stop...

  15. Unilateral vs one stage bilateral total knee replacement in rheumatoid and osteoarthritis - A comparative study

    Directory of Open Access Journals (Sweden)

    Kiran E

    2005-01-01

    Full Text Available Background : A controversy exists regarding simultaneous or staged bilateral total knee replacement. Methods: Fifty patients undergoing simultaneous bilateral and 50 undergoing unilateral total knee arthroplasty were evaluated prospectively to compare the clinical, radiological results and complication rates. Eighty-four patients belonged to ASA category II or III preoperatively. The study included a high proportion of rheumatoid patients and osteoarthritis patients with severe deformities. Results: Bilateral group had greater blood loss and required more blood transfusion, but there was no difference in requirement of postoperative intensive care and the complication rates. Rheumatoid knees had lower pre and postoperative knee score and functional score as compared to osteoarthritic knees. Morbidity and mortality of one stage bilateral knee replacement was no greater than unilateral operation. Conclusion: Simultaneous bilateral knee replacement in younger patients with advanced rheumatoid arthritis is safe and effective

  16. Microstructure of a safe-end dissimilar metal weld joint (SA508-52-316L) prepared by narrow-gap GTAW

    Energy Technology Data Exchange (ETDEWEB)

    Ming, Hongliang [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning Key Laboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); University of Chinese Academy of Sciences, 19 Yuquan Road, Beijing 100049 (China); Zhang, Zhiming [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning Key Laboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Wang, Jianqiu, E-mail: wangjianqiu@imr.ac.cn [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning Key Laboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Han, En-Hou [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning Key Laboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Wang, Peipei; Sun, Zhiyuan [Shanghai Research Center for Weld and Detection Engineering Technique of Nuclear Equipment, Shanghai 201306 (China)

    2017-01-15

    The microstructure, residual strain and interfacial chemical composition distribution of a safe-end dissimilar metal weld joint (DMWJ, SA508-52-316L) prepared by narrow-gap gas-tungsten arc welding (NG-GTAW) were studied by optical microscope (OM) and scanning electron microscope equipped with an energy dispersive X-ray microanalysis (SEM/EDX) and an electron back scattering diffraction (EBSD) system. Complex microstructure and chemical composition distribution are found, especially at the SA508-52 interface and the 52-316L interface. In brief, a complicated microstructure transition exists within the SA508 heat affected zone (HAZ); the residual strain, the fraction of high angle random grain boundaries and low angle boundaries decrease with increasing the distance from the fusion boundary in 316L HAZ; neither typical type II boundary nor obvious carbon-depleted zone is found near the SA508-52 interface; dramatic and complicated changes of the contents of the main elements, Fe, Cr and Ni, are observed at the distinct interfaces, especially at the SA508-52 interface. No carbon concentration is found at the SA508-52 interface. - Highlights: •Residual strain and GBCD change as a function of the distance from FB in 316L HAZ. •Neither type II boundary nor obvious carbon-depleted zone is found in SA508 HAZ. •No carbon concentration is found at the SA508-52 interface. •The middle part of the DMWJ has the highest residual strain.

  17. Experimental and thermodynamic assessment of beryllium-replacement materials for CANDU brazed joints

    Energy Technology Data Exchange (ETDEWEB)

    Potter, K.N.; Ferrier, G.A.; Corcoran, E.C., E-mail: Kieran.Potter@rmc.ca [Royal Military College of Canada, Kingston ON, (Canada); Dimayuga, F.C. [Canadian Nuclear Laboratories, Chalk River, ON (Canada)

    2015-07-01

    Currently, appendages are joined to CANDU fuel elements via a brazing process, with beryllium as the filler material. A potential reduction in the occupational limit on airborne beryllium particulates has motivated research into alternative brazing materials. To this end, the Canadian nuclear industry has funded an initiative to identify and evaluate the suitability of several candidate brazing materials. This work describes contributions toward the assessment of alternative brazing materials from the Royal Military College of Canada (RMCC). An impact testing method was developed to evaluate the mechanical strength of candidate braze joints.Thermodynamic modelling was performed to predict the aqueous behaviour of each candidate material in CANDU coolant conditions characteristic of reactor shutdown, and corrosion experiments are underway to support modelling predictions.The results of these activities will assist in selecting a suitable replacement material for beryllium. (author)

  18. Radiological and environmental surveillance in front-end fuel cycle facilities

    International Nuclear Information System (INIS)

    Khan, A.H.; Sahoo, S.K.; Tripathi, R.M.

    2004-01-01

    This paper describes the occupational and environmental radiological safety measures associated with the operations of front end nuclear fuel cycle. Radiological monitoring in the facilities is important to ensure safe working environment, protection of workers against exposure to radiation and comply with regulatory limits of exposure. The radiation exposure of workers in different units of the front end nuclear fuels cycle facilities operated by IREL, UCIL and NFC and environmental monitoring results are summarised

  19. Large scale replacement of fuel channels in the Pickering CANDU reactor using a man-in-the-loop remote control system

    International Nuclear Information System (INIS)

    Stratton, D.

    1991-01-01

    Spar Aerospace Limited of Toronto is presently under contract to Ontario Hydro to design a Remote Manipulation and Control System (RMCS) to be used during the large scale replacement of the fuel channels in the Pickering A Nuclear Generating Station. The system is designed to support the replacement of all 390 fuel channels in each of the four reactors at the Pickering A station in a safe manner that minimizes worker radiation exposure and unit outage time

  20. Initial Experience with the Machine Protection System for LHC

    CERN Document Server

    Schmidt, Ruediger; Dehning, Bernd; Ferro-Luzzi, Massimiliano; Goddard, Brennan; Lamont, Mike; Siemko, Andrzej; Uythoven, Jan; Wenninger, Jorg; Zerlauth, Markus

    2010-01-01

    For nominal beam parameters at 7 TeV/c each proton beam with a stored energy of 362 MJ threatens to damage accelerator equipment in case of uncontrolled beam loss. These parameters will only be reached after some years of operation, however, a small fraction of this energy is already sufficient to damage accelerator equipment or experiments. The correct functioning of the machine protection systems is vital during the different operational phases already for initial operation. When operating the complex magnet system, with and without beam, safe operation relies on the protection and interlock systems for the superconducting circuits. For safe injection and transfer of the beams from SPS to LHC, transfer line parameters are monitored, beam absorbers must be in the correct position and the LHC must be ready to accept beam. At the end of a fill and in case of failures beams must be properly extracted onto the dump blocks, for some types of failure within less than few hundred microseconds. Safe operation requir...

  1. Willingness to pay for replacing traditional energies with renewable energy in South Korea

    International Nuclear Information System (INIS)

    Lee, Chul-Yong; Lee, Min-Kyu; Yoo, Seung-Hoon

    2017-01-01

    This study aims to estimate consumers' willingness to pay (WTP) for replacing traditional energy generated from nuclear and coal sources with renewable energy, using a contingent valuation (CV) model. To this end, it reports the results from a CV survey of 1000 respondents and a spike model. The estimate obtained shows that consumers are willing to pay an additional USD 3.3 per month to replace nuclear power and USD 3.0 per month to replace coal energy. The total WTPs for the substitution of nuclear power and coal-fired power with renewable energy sources are calculated as USD 722 million and USD 659 million, respectively. When such a WTP is provided for installing photovoltaic equipment, the photovoltaic capacity of 372 MW for nuclear power substitution and 339 MW for coal-fired power substitution can be built every year, taking into consideration the backup cost and opportunity cost. Given that the WTP means the level of public acceptability of a rising energy bill, Korean consumers would accept an increase in their electricity bills caused by solar photovoltaic energy equivalent to 31–32 GW in the medium and long term. - Highlights: • There is a growing need to replace traditional energies with renewable energy. • We estimate consumers' willingness to pay (WTP) for the replacement. • To this end, a contingent valuation survey of 1000 households was conducted. • Monthly WTPs are USD 3.3 and 3.0 for nuclear power and coal, respectively. • These values amount to solar photovoltaic energy equivalent to 31–32 GW.

  2. Exploring drivers for safe male circumcision: Experiences with health education and understanding of partial HIV protection among newly circumcised men in Wakiso, Uganda.

    Directory of Open Access Journals (Sweden)

    Simon P S Kibira

    Full Text Available About 2.5 million men have voluntarily been circumcised since Uganda started implementing the WHO recommendation to scale up safe male circumcision to reduce HIV transmission. This study sought to understand what influences men's circumcision decisions, their experiences with health education at health facilities and their knowledge of partial HIV risk reduction in Wakiso district.Data were collected in May and June 2015 at five public health facilities in Wakiso District. Twenty-five in-depth interviews were held with adult safe male circumcision clients. Data were analysed using thematic network analysis.Safe male circumcision decisions were mainly influenced by sexual partners, a perceived need to reduce the risk of HIV/STIs, community pressure and other benefits like hygiene. Sexual partners directly requested men to circumcise or indirectly influenced them in varied ways. Health education at facilities mainly focused on the surgical procedure, circumcision benefits especially HIV risk reduction, wound care and time to resumption of sex, with less focus on post-circumcision sexual behaviour. Five men reported no health education. All men reported that circumcision only reduces and does not eliminate HIV risk, and could mention ways it protects, although some extended the benefit to direct protection for women and prevention of other STIs. Five men thought social marketing messages were 'misleading' and feared risk compensation within the community.Participants reported positive community perception about safe male circumcision campaigns, influencing men to seek services and enabling female partners to impact this decision-making process. However, there seemed to be gaps in safe male circumcision health education, although all participants correctly understood that circumcision offers only partial protection from HIV. Standard health education procedures, if followed at health facilities offering safe male circumcision, would ensure all

  3. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    International Nuclear Information System (INIS)

    Miller, M.H.

    1995-01-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT trademark Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS

  4. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.H. [Duke Power Co., Seneca, SC (United States)

    1995-04-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT{trademark} Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS.

  5. Enzyme Replacement Therapy for Fabry Disease

    Directory of Open Access Journals (Sweden)

    Maria Dolores Sanchez-Niño PhD

    2016-11-01

    Full Text Available Fabry disease is a rare X-linked disease caused by the deficiency of α-galactosidase that leads to the accumulation of abnormal glycolipid. Untreated patients develop potentially lethal complications by age 30 to 50 years. Enzyme replacement therapy is the current standard of therapy for Fabry disease. Two formulations of recombinant human α-galactosidase A (agalsidase are available in most markets: agalsidase-α and agalsidase-β, allowing a choice of therapy. However, the US Food and Drug Administration rejected the application for commercialization of agalsidase-α. The main difference between the 2 enzymes is the dose. The label dose for agalsidase-α is 0.2 mg/kg/2 weeks, while the dose for agalsidase-β is 1.0 mg/kg/2 weeks. Recent evidence suggests a dose-dependent effect of enzyme replacement therapy and agalsidase-β is 1.0 mg/kg/2 weeks, which has been shown to reduce the occurrence of hard end points (severe renal and cardiac events, stroke, and death. In addition, patients with Fabry disease who have developed tissue injury should receive coadjuvant tissue protective therapy, together with enzyme replacement therapy, to limit nonspecific progression of the tissue injury. It is likely that in the near future, additional oral drugs become available to treat Fabry disease, such as chaperones or substrate reduction therapy.

  6. The SafeCOP ECSEL Project: Safe Cooperating Cyber-Physical Systems Using Wireless Communication

    DEFF Research Database (Denmark)

    Pop, Paul; Scholle, Detlef; Hansson, Hans

    2016-01-01

    This paper presents an overview of the ECSEL project entitled "Safe Cooperating Cyber-Physical Systems using Wireless Communication" (SafeCOP), which runs during the period 2016 -- 2019. SafeCOP targets safety-related Cooperating Cyber-Physical Systems (CO-CPS) characterised by use of wireless...... detection of abnormal behaviour, triggering if needed a safe degraded mode. SafeCOP will also develop methods and tools, which will be used to produce safety assurance evidence needed to certify cooperative functions. SafeCOP will extend current wireless technologies to ensure safe and secure cooperation...

  7. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  8. The iDuo Bi-compartmental Knee Replacement: Our Early Experience.

    Directory of Open Access Journals (Sweden)

    Peter Jemmett

    2016-12-01

    Our early results suggest that the iDuo knee is a good option for those with isolated bi-compartmental disease and outcome scores are comparable with those reported for the BKA. This bi-compartmental design may bridge the gap between the uni-compartmental and total knee replacement. The choice between monolithic or modular designs remains in debate. We will continue to use this prosthesis for a carefully selected group of patients.

  9. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  10. In Situ Surgery: Is It Safe ? (Experience with 60 cases) | El Sadat ...

    African Journals Online (AJOL)

    Conclusion: NSU is a safe place for performing in-situ surgery (ISS) without increased risk of infection. Successful operative intervention within NSU requires good planning and cooperation between anesthesiologist, surgeons, neonatologist and nursing staff. Maximum benefit is observed in neonates who have definite risk ...

  11. Environmentally safe system for treatment of bio corrosion of ETICS

    Directory of Open Access Journals (Sweden)

    Minarovičová Katarína

    2018-01-01

    Full Text Available Effects of microorganisms on building facades are responsible for aesthetic, bio-geophysical and biogeochemical deterioration. The process of cleaning of contaminated facades involves the removal and eradication of micro flora on the surface of insulation using chemical products, killing cells and eliminating all living mass, including organic ingredients. The removal of bio corrosion coating from ETICS structure by means of chemical and preservative substances (biocides is currently the only effective and most used technology. Uncontrolled leaching of the used biocides is unacceptable. Meantime, new technology for environmentally safe maintenance of ETICS is needed. Scientists have been working on replacement the biocides currently used in facades treatment with eco-friendly biocides that have no negative effects on the environment or human beings. While the eco- treatment will be available, safe dewatering of chemicals being leached from the surface of the facade could be provided by e.g. special drain systems adjusted to the building type, use and age. The paper gives an overview of the problem in context of Slovakia and examples of leaching systems designed for new and renovated buildings.

  12. Evolution and development of laws, regulations, criteria and human resources to ensure the safe decommissioning of nuclear facilities in Thailand

    International Nuclear Information System (INIS)

    Keinmeesuke, S.

    2006-01-01

    The Research Reactor, TRR-1 (renamed TRR-1/M1 after core replacement) in Thailand has been operated for more than 43 years. This ageing reactor will be facing shutdown in the near future. Laws and Regulations have been continually developed to assure the safe operation of nuclear facilities, particularly of the research reactor, and to ensure the safe decommissioning of the reactor after its operational life. However, the Thai nuclear legislation is still not applicable to a number of areas. Office of Atoms for Peace is working toward development of a new consolidated Act. In addition, the licensing steps for modification and decommissioning are added to the new Ministerial Regulation and to the new guidance documents on the licensing process for research reactors. Regulations, guidance and criteria for approval of decommissioning are being developed using the IAEA Safety Standards Series as the main basis for drafting. Human resource development is considered as one of the key important factor to ensure safe decommissioning of the installation. Staffing and training of the operating organization and the regulatory body personnel have been addressed to ensure the achievement of competency level. Simple methods and technologies are the best means for implementation while learning from experience of others will help and support us in our attempt to be the 'second First'. IAEA advice and assistance on the decommissioning of nuclear facilities in countries with limited resources is desirable. (author)

  13. Defining the Optimal Dietary Approach for Safe, Effective and Sustainable Weight Loss in Overweight and Obese Adults

    Directory of Open Access Journals (Sweden)

    Chrysi Koliaki

    2018-06-01

    Full Text Available Various dietary approaches with different caloric content and macronutrient composition have been recommended to treat obesity in adults. Although their safety and efficacy profile has been assessed in numerous randomized clinical trials, reviews and meta-analyses, the characteristics of the optimal dietary weight loss strategy remain controversial. This mini-review will provide general principles and practical recommendations for the dietary management of obesity and will further explore the components of the optimal dietary intervention. To this end, various dietary plans are critically discussed, including low-fat diets, low-carbohydrate diets, high-protein diets, very low-calorie diets with meal replacements, Mediterranean diet, and diets with intermittent energy restriction. As a general principle, the optimal diet to treat obesity should be safe, efficacious, healthy and nutritionally adequate, culturally acceptable and economically affordable, and should ensure long-term compliance and maintenance of weight loss. Setting realistic goals for weight loss and pursuing a balanced dietary plan tailored to individual needs, preferences, and medical conditions, are the key principles to facilitate weight loss in obese patients and most importantly reduce their overall cardiometabolic risk and other obesity-related comorbidities.

  14. Safe Kids Worldwide

    Science.gov (United States)

    ... Blog Videos Newsletter facebook twitter instagram pinterest gplus youtube Search Menu Why It Matters Who We Are What We Do Find Your Safe Kids Safe Kids Day Main menu Keeping All Kids Safe Safety Tips Get Involved 4 Star Charity Donate Text Burns and Scalds 4 tips ...

  15. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  16. Effect of Safe Water on Arsenicosis: A Follow-up Study.

    Science.gov (United States)

    Majumdar, Kunal K; Ghose, Aloke; Ghose, Nilima; Biswas, Anirban; Mazumder, D N Guha

    2014-04-01

    Arsenic pollution in groundwater, used for drinking purposes, has been envisaged as a problem of global concern. Treatment options for the management symptoms of chronic arsenicosis are limited. Mitigation option available for dealing with the health problem of ground water arsenic contamination rests mainly on supply of arsenic safe water in arsenic-endemic region of Indo-Bangladesh subcontinent. Limited information is available regarding the long-term effect of chronic arsenic toxicity after stoppage of consumption of arsenic-containing water. The current study was, therefore, done to assess, objectively, the effect of drinking arsenic safe water (water source in their houses were supplied with arsenic removal filters for getting arsenic-free water during the follow-up period. In participants belonging to Cohort-I, the skin score was found to improve significantly at the end of each year, and it was found to be reduced significantly from 2.17 ± 1.09 to 1.23 ± 1.17; P water on skin lesions. The systemic disease symptom score was also found to improve, but less significantly, at the end of 3 years in both the cohorts. Most important observation during the follow-up study was persistence of severe symptoms of chronic lung disease and severe skin lesion including Bowen's disease in spite of taking arsenic-safe water. Further, death could not be prevented to occur because of lung cancer and severe lung disease. It is, therefore, an urgent need to make arrangement for availability of safe water source among the arsenic-affected people in the district. Many of the people in the affected villages are not aware of contamination of their home tube wells with arsenic. Awareness generation and motivation of the people for testing their drinking water sources for arsenic and environmental interventions like rain water harvesting, ground water recharge, and restricting excessive use of ground water for domestic and agricultural purposes are also important to prevent further

  17. Primary Total Knee Replacement: Is Suction a Portal of Infection?

    Science.gov (United States)

    Budnar, Vijaya M; Amirfeyz, Rouin; Ng, Michael; Bannister, Gordon C; Blom, Ashley W

    2009-01-01

    INTRODUCTION Pulsed lavage during a total knee replacement usually leaves a pool of fluid on the surgical drapes. It is common practice to suck away this fluid using the same suction device used intra-operatively. This could be a cause of direct wound contamination. We hypothesised that bacteria contaminate fluid that collects around the foot in total knee replacement surgery and that suction equipment could be a portal of contamination. We also hypothesised that bacterial count in the fluid is lower if chlorhexidine, rather than saline, is used in the pulsed lavage. PATIENTS AND METHODS Forty patients undergoing primary total knee replacement were divided into two groups. The first group had pulsed lavage with normal saline and the second with 0.05% chlorhexidine. RESULTS At the end of the operation, 20 ml of fluid, pooled on the surgical drapes was aspirated and cultured for bacterial growth. None of the fluid samples showed bacterial growth. CONCLUSIONS Suction device used peri-operatively during knee replacement is unlikely to be a cause of wound contamination. Pulsed lavage with normal saline is as effective as lavage with chlorhexidine. PMID:19335972

  18. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    Energy Technology Data Exchange (ETDEWEB)

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  19. New energy replacement method for resonant power supplies

    International Nuclear Information System (INIS)

    Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab

  20. Systems for the safe operation of the JET tokamak with tritium

    International Nuclear Information System (INIS)

    Stork, D.; Ageladarakis, P.; Bell, A.C.

    1999-01-01

    In 1997, the JET device was operated for an extensive campaign with deuterium-tritium (D-T) plasmas (the DTE1 campaign). A comprehensive network of machine protection systems was necessary so that this experimental campaign could be executed safely without damage to the machine or release of activated material. This network had been developed over many years of JET deuterium plasma operation and therefore the modifications for D-T operation was not a significant problem. The DTE1 campaign was executed successfully and safely and the machine protection systems proved reliable and robust and, in the limited cases where they were required to act, functioned correctly. The machine protection systems at JET are described and their categorisation and development over time are summarised. The management, commissioning and operational experience during DTE1 are discussed and some examples of fault scenarios are described. The experience with protection systems at JET highlights the importance of correct design and philosophy decisions being taken at an early stage. It is shown that this experience will be invaluable data input to the safe operation of future large fusion machines. (orig.)

  1. Means-End based Functional Modeling for Intelligent Control: Modeling and Experiments with an Industrial Heat Pump System

    DEFF Research Database (Denmark)

    Saleem, Arshad

    2007-01-01

    The purpose of this paper is to present a Multilevel Flow Model (MFM) of an industrial heat pump system and its use for diagnostic reasoning. MFM is functional modeling language supporting an explicit means-ends intelligent control strategy for large industrial process plants. The model is used...... in several diagnostic experiments analyzing different fault scenarios. The model and results of the experiments are explained and it is shown how MFM based intelligent modeling and automated reasoning can improve the fault diagnosis process significantly....

  2. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  3. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  4. "Same Room, Safe Place".

    Science.gov (United States)

    Keene Woods, Nikki

    2017-04-01

    There are many different professional stances on safe sleep and then there is the reality of caring for a newborn. There is a debate among professionals regarding safe sleep recommendations. The continum of recommendations vary from the American Academy of Pediatrics (AAP) Safe Sleep Guidelines to the bed-sharing recommendations from the Mother-Baby Behavioral Sleep Laboratory. The lack of consistent and uniform safe sleep recommendations from health professionals has been confusing for families but has more recently raised a real professional ethical dilemma. Despite years of focused safe sleep community education and interventions, sleep-related infant deaths are on the rise in many communities. This commentary calls for a united safe sleep message from all health professionals to improve health for mothers and infants most at-risk, "Same Room, Safe Place."

  5. Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement.

    Science.gov (United States)

    Whitcomb, Winthrop F; Lagu, Tara; Krushell, Robert J; Lehman, Andrew P; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K

    2015-09-01

    Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls-patients treated before bundle implementation-45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p=.24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p=.43), and lower median posthospital payments ($704 versus $1,121, p=.002), and were more likely to receive guideline-consistent care (99% versus 95%, p=.05). The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams.

  6. Experiences of non-specialist nurses caring for patients and their significant others undergoing transitions during palliative end-of-life cancer care

    DEFF Research Database (Denmark)

    Thorn, Hrønn; Uhrenfeldt, Lisbeth

    2017-01-01

    electronic databases and seven websites were searched. Methodological quality: Methodological validity of the qualitative papers was assessed independently by two reviewers using the standardized critical appraisal instruments from the Joanna Briggs Institute Qualitative Assessment and Review Instrument (JBI...... knowledge and personal growth. Objective/question: What are non-specialist nurses’ experiences when providing palliative end-of-life cancer care that involves the psychosocial and existential transitions of their patients and significant others? Inclusion criteria Types of participants: The current review...... considered studies that included a description of the experiences of non-specialist trained registered nurses (RNs) working in non-specialist wards. Phenomena of interest: The current review considered studies that investigated experiences of RNs when providing palliative end-of-life cancer care...

  7. Grapples for manipulating end fittings for nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1982-01-01

    A nuclear fuel assembly includes control rod guide tubes the upper ends of which protrude beyond a spider and are locked in place by means of a cellular lattice seated in grooves in the outer surfaces of the sleeves. A grapple is provided for disengaging the structure comprising lattice, spider, springs and a grill from the end of the fuel assembly to enable these components to be removed in an assembly state and subsequently replaced after inspection and repair. (author)

  8. Seventeen years of LMFBR experience: Experimental Breeder Reactor II (EBR-II)

    International Nuclear Information System (INIS)

    Perry, W.H.; Lentz, G.L.; Richardson, W.J.; Wolz, G.C.

    1982-01-01

    Operating experience at EBR-II over the past 17 years has shown that a sodium-cooled pool-type reactor can be safely and efficiently operated and maintained. The reactor has performed predictably and benignly during normal operation and during both unplanned and planned plant upsets. The duplex-tube evaporators and superheaters have never experienced a sodium/water leak, and the rest of the steam-generating system has operated without incident. There has been no noticeable degradation of the heat transfer efficiency of the evaporators and superheaters, except for the one superheater replaced in 1981. There has been no need to perform any chemical cleaning of steam-system components

  9. Safe transport of radioactive materials in Egypt

    International Nuclear Information System (INIS)

    El-Shinawy, R.M.K.

    1994-01-01

    In Egypt the national regulations for safe transport of radioactive materials (RAM) are based on the International Atomic Energy Agency (IAEA) regulations. In addition, regulations for the safe transport of these materials through the Suez Canal (SC) were laid down by the Egyptian Atomic Energy Authority (EAEA) and the Suez Canal Authority (SCA). They are continuously updated to meet the increased knowledge and the gained experience. The technical and protective measures taken during transport of RAM through SC are mentioned. Assessment of the impact of transporting radioactive materials through the Suez Canal using the INTERTRAN computer code was carried out in cooperation with IAEA. The transported activities and empty containers, the number of vessels carrying RAM through the canal from 1963 and 1991 and their nationalities are also discussed. The protective measures are mentioned. A review of the present situation of the radioactive wastes storage facilities at the Atomic Energy site at Inshas is given along with the regulation for safe transportation and disposal of radioactive wastes. (Author)

  10. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  11. Family caregiver's experiences of providing care to patients with End-Stage Renal Disease in South-West Nigeria.

    Science.gov (United States)

    Oyegbile, Yemisi Okikiade; Brysiewicz, Petra

    2017-09-01

    To describe the experiences of family caregivers providing care for patients living with End-Stage Renal Disease in Nigeria BACKGROUND: Family caregiving is where an unpaid volunteer, usually a close family member, attends to the needs of a loved one with a chronic, disabling illness within the home. Much research has been conducted in the area of family caregiving in high-income countries. However, the same cannot be said for many of the low-resource, multicultural African countries. Qualitative descriptive study. This qualitative descriptive study used manifest content analysis to analyse data from semi-structured, individual interviews, with 15 purposively selected family caregivers. Two tertiary institutions providing renal care in South-Western Nigeria: the research setting for this study. Five categories were identified, and these included disconnectedness with self and others, never-ending burden, 'a fool being tossed around', obligation to care and promoting a closer relationship. Experiences associated with the caregiving of patients diagnosed with End-Stage Renal Disease evoked a number of emotions from the family caregivers, and the study revealed that caregiving imposed some burdens that are specific to low-resource countries on participants. Nurses need to engage family caregivers on disease-specific teachings that might promote understanding of the disease process and role expectation. Family caregivers may benefit from social support services. © 2016 John Wiley & Sons Ltd.

  12. Pulmonary Valve Replacement : Twenty-Six Years of Experience With Mechanical Valvar Prostheses

    NARCIS (Netherlands)

    Freling, Hendrik G.; van Slooten, Ymkje J.; van Melle, Joost P.; Ebels, Tjark; Hoendermis, Elke S.; Berger, Rolf M. F.; Hillege, Hans L.; Waterbolk, Tjalling W.; van Veldhuisen, Dirk J.; Willems, Tineke P.; Pieper, Petronella G.

    BACKGROUND: Although the thromboembolic risk after pulmonary valve replacement (PVR) with mechanical valves is presumed to be high, recent studies suggest promising short-term and mid-term results. However, large studies reporting long-term mortality and valve-related complications are missing.

  13. Using the renal pelvis flap to replace the whole hypoplastic ureter: a ...

    African Journals Online (AJOL)

    Background Hypoplastic ureter is a rare condition usually associated with hypoplastic kidney, and it ends with nephrectomy in most of the cases. Many techniques have been described as ureteric substitutes in the literature. Here, we describe a new technique using the renal pelvis flap to replace the whole hypoplastic ...

  14. Evaluation of biochemical parameters and productive performance of japanese quail in response to the replacement of soybean meal with canola meal

    Directory of Open Access Journals (Sweden)

    Ali Asghar Saki

    2017-02-01

    Full Text Available The present study was conducted to evaluation the different levels canola meal (CM replacement by soybean meal (SBM in Japanese quails diets on productive performance, egg quality trails and blood parameters including blood protein, minerals concentration, liver enzymes and thyroid hormones. In this study, 160 of Japanese quails in second laying phase from 46 to 56 weeks of age were divided in four treatments with four replicates and 10 quail in each per replicate, on a completely randomized design (CRD.Treatments consisted:T1 control (without CM, T2, T3 and T4 replacing 30, 60 and 90% of SBM with CM respectively. The results were shown no significant variation in body weight between treatments in initial and end of the experiment (p > 0.05. There was significant decrease in feed intake by increasing level of CM (p 0.05. However, the egg shell thickness showed significantly decreased with increasing levels of canola meal in the diet  (p < 0.05. According to this study results, 30% replacement of SBM by CM in the diet (contained 10% CM has no adverse effect on quail’s performance.

  15. ATLAS end-cap detector

    CERN Multimedia

    Maximilien Brice

    2003-01-01

    Three scientists from the Institute of Nuclear Phyiscs at Novossibirsk with one of the end-caps of the ATLAS detector. The end-caps will be used to detect particles produced in the proton-proton collisions at the heart of the ATLAS experiment that are travelling close to the axis of the two beams.

  16. Evaluation of the Ride-Through Capability of an Active-Front-End Adjustable Speed Drive under Real Grid Conditions

    DEFF Research Database (Denmark)

    Liserre, Marco; Klumpner, Christian; Blaabjerg, Frede

    2004-01-01

    Better quality of the input currents, unity power factor and regenerative capability are not the only benefits of equipping an Adjustable Speed Drive (ASD) with an active front-end-stage. Controlling the power inflow may enable also the reduction of the dc-link energy storage, which will then lead...... to the replacement of the electrolytic capacitors with film capacitors, which have lower energy density meaning that the volume is similar, but will increase the ASD lifetime. In these circumstances, operation under unbalanced and distorted supply voltage as well as high dynamic operation of the ASD makes...... the control task more challenging. The aim of this paper is to investigate the ride-through capability of an ASD with active front-end under real grid conditions and in view of the minimum dc-link storage. Experiments validate the theoretical analysis....

  17. Feeling safe and motivated to achieve better health: Experiences with a partnership-based nursing practice programme for in-home patients with chronic obstructive pulmonary disease.

    Science.gov (United States)

    Leine, Marit; Wahl, Astrid Klopstad; Borge, Christine Råheim; Hustavenes, Magne; Bondevik, Hilde

    2017-09-01

    To explore chronic obstructive pulmonary disease patients' experiences with a partnership-based nursing practice programme in the home setting. Patients with chronic obstructive pulmonary disease suffer from psychological and physiological problems, especially when they return home after hospitalisation from exacerbation. Many express a need for information and knowledge about chronic obstructive pulmonary disease. Partnership as practice is a patient-centred framework providing an individualised practice for each patient. This study intends to achieve a nuanced and improved understanding of chronic obstructive pulmonary disease patients' experiences with a partnership-based nursing practice programme comprising home visits from a respiratory nurse after hospital discharge, alongside interdisciplinary collaboration. This study has a qualitative design with interviews. Six individual semi-structured interviews collected in 2012-2013 constitute the material. Interviews were recorded, transcribed to written text and analysed using systematic text condensation. Three key themes were identified: to be seen, talked with and understood; healthcare support at home-continuity, practical support and facilitation; and exchange of knowledge. However, there were two generic themes that permeated the material: feeling safe and comforted, and motivation to achieve better health. Patients with chronic obstructive pulmonary disease can experience feeling safe and comforted, and be motivated to make changes in order to achieve better health after participating in a partnership-based nursing practice programme that includes home visits from a respiratory nurse and interdisciplinary cooperation after hospital discharge. To feel safe is of great importance, and how this relates to the patient's ability to cope with illness should be explored in further research. The results suggest that the partnership-based nursing practice programme that includes home visits and interdisciplinary

  18. CDF End Plug calorimeter Upgrade Project

    International Nuclear Information System (INIS)

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R ampersand D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R ampersand D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, γ and π 0 has been designed. Its performance requirements, R ampersand D results and mechanical design are discussed

  19. Analysis of the interim safe storage of reactors at the Hanford site

    International Nuclear Information System (INIS)

    Wang Hailiang

    2014-01-01

    The nine production reactors, i.e. B, C, D, DR, F, H, KE, KW and N, at the Hanford site are all water-cooled and graphite-moderated reactors with natural uranium fuel. In 1993, the U.S. Department of Energy (DOE) decided to put eight production reactors (except for B) into Interim Safe Storage (ISS) for 75 years followed by deferred one-piece removal. Reactor B will remain as a national historical landmark. By the end of 2013, six reactors C, F, D, DR, H and N had been successfully put into the ISS. Reactors KE and KW will be put into the ISS in the coming years. Taking reactor C as an example, this paper mainly talks about how to put the production reactors in the Interim Safe Storage, e.g. how to make site preparation, how to construct the safe storage enclosure (SSE) and how to perform surveillance and maintenance during the ISS period, etc. (authors)

  20. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  1. DroidSafe

    Science.gov (United States)

    2016-12-01

    Massachusetts Avenue, Build E19-750 Cambridge , MA 02139-4307 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS...Activity objects illustrating the challenges of points-to and information flow analysis...measure how many malicious flows Droid- Safe was able to detect). As these results illustrate , DroidSafe implements an analysis of unprece- dented

  2. Increasing gas producer profitability with virtual well visibility via an end-to-end, wireless Internet gas monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    McDougall, M.; Coleman, K.; Beck, R.; Lyon, R.; Potts, R. [Northrock Resources Ltd., Calgary, AB (Canada); Benterud, K. [Zed.i solutions, Calgary, AB (Canada)

    2003-07-01

    Most gas producing companies still use 100-year old technology to measure gas volumes because of the prohibitive costs of implementing corporate wide electronic information systems to replace circular mechanical chart technology. This paper describes how Northrock Resources Ltd. increased profitability using Smart-Alek{sup TM} while avoiding high implementation costs. Smart-Alek is a new type of fully integrated end-to-end electronic gas flow measurement (GFM) system based on Field Intelligence Network and End User Interference (FINE). Smart-Alek can analyze gas production through public wireless communications and a web-browser delivery system. The system has enabled Northrock to increase gas volumes with more accurate measurement and reduced downtime. In addition, operating costs were also decreased because the frequency of well visits was reduced and the administrative procedures of data collection was more efficient. The real-time well visibility of the tool has proven to be very effective in optimizing business profitability. 9 refs., 1 tab., 9 figs.

  3. Total ankle joint replacement.

    Science.gov (United States)

    2016-02-01

    Ankle arthritis results in a stiff and painful ankle and can be a major cause of disability. For people with end-stage ankle arthritis, arthrodesis (ankle fusion) is effective at reducing pain in the shorter term, but results in a fixed joint, and over time the loss of mobility places stress on other joints in the foot that may lead to arthritis, pain and dysfunction. Another option is to perform a total ankle joint replacement, with the aim of giving the patient a mobile and pain-free ankle. In this article we review the efficacy of this procedure, including how it compares to ankle arthrodesis, and consider the indications and complications. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  4. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  5. Valve-sparing aortic root replacement in children: intermediate-term results.

    Science.gov (United States)

    Patel, Nishant D; Arnaoutakis, George J; George, Timothy J; Allen, Jeremiah G; Alejo, Diane E; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2011-03-01

    Valve-sparing root replacement (VSRR) is an attractive option for aortic aneurysm in children with low-operative risk, but mid- and late-term results are not yet known. Between 1997 and 2009, 56 children (mean age 11.5 years) underwent VSRR at our institution. Twenty-six (46.4%) had Marfan syndrome and 24 (42.8%) had Loeys-Dietz syndrome. Mean preoperative max sinus diameter was 4.2±0.8 cm (Z-score 7.7±2.9). Five (8.9%) had >2+ aortic insufficiency (AI). Two (3.6%) underwent David I reimplantation with a straight-tube, 12 (21.4%) had a Yacoub remodeling procedure, and 42 (75.0%) had reimplantation using a Valsalva-graft. There were one (1.8%) operative and three (5.4%) late deaths. One patient required reoperation for bleeding and one required late repair of a distal pseudoaneurysm. Mean follow-up was 5.2 years (range 0-12 years). No patients suffered thromboembolic events or had endocarditis. Of the 12 remodeling patients, four (33.3%) developed >2+ AI and required aortic valve repair or replacement. No patient developed >2+ AI after reimplantation. VSRR in children is a safe alternative to aortic root replacement with mechanical or biological prostheses. In this particular group of patients with connective tissue disorders and proclivity toward annular dilation and late AI, reimplantation is superior to remodeling.

  6. Spark-safe mechanical fluctuation sensor

    Energy Technology Data Exchange (ETDEWEB)

    Retek, S; Galisz, T

    1979-04-20

    The subject of the invention is a mechanical fluctuation sensor in a spark-safe design for use at mines which are dangerous for gas, as an element of different systems for remote control information transfer. The patented sensor of mechanical fluctuations contains: magnetic-induction transformer characterized by the fact that its inert mass consists of a plane permanent magnet placed in the suspended state on springs between 2 coils, which together with their cores are rigidly fixed to the walls of the ferromagnetic vessels. The ends of the coil windings are interconnected, while the beginnings of the windings are lead out with connection to the outlet of the electronic amplifier with binary outlet signal. The electronic amplifier is placed between the transformer in the common ferromagnetic housing which is a screen for protection from the effect of external magnetic fields.

  7. Safe havens in Europe

    DEFF Research Database (Denmark)

    Paldam, Martin

    2013-01-01

    Eleven safe havens exist in Europe providing offshore banking and low taxes. Ten of these states are very small while Switzerland is moderately small. All 11 countries are richer than their large neighbors. It is shown that causality is from small to safe haven to wealth, and that theoretically...... equilibriums are likely to exist where a certain regulation is substantially lower in a small country than in its big neighbor. This generates a large capital inflow to the safe havens. The pool of funds that may reach the safe havens is shown to be huge. It is far in excess of the absorptive capacity...... of the safe havens, but it still explains, why they are rich. Microstates offer a veil of anonymity to funds passing through, and Switzerland offers safe storage of funds....

  8. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  9. Traveling Safely with Medicines

    Science.gov (United States)

    ... Medications Safely My Medicine List How to Administer Traveling Safely with Medicines Planes, trains, cars – even boats ... your trip, ask your pharmacist about how to travel safely with your medicines. Make sure that you ...

  10. Overview of FEED, the feeding experiments end-user database.

    Science.gov (United States)

    Wall, Christine E; Vinyard, Christopher J; Williams, Susan H; Gapeyev, Vladimir; Liu, Xianhua; Lapp, Hilmar; German, Rebecca Z

    2011-08-01

    The Feeding Experiments End-user Database (FEED) is a research tool developed by the Mammalian Feeding Working Group at the National Evolutionary Synthesis Center that permits synthetic, evolutionary analyses of the physiology of mammalian feeding. The tasks of the Working Group are to compile physiologic data sets into a uniform digital format stored at a central source, develop a standardized terminology for describing and organizing the data, and carry out a set of novel analyses using FEED. FEED contains raw physiologic data linked to extensive metadata. It serves as an archive for a large number of existing data sets and a repository for future data sets. The metadata are stored as text and images that describe experimental protocols, research subjects, and anatomical information. The metadata incorporate controlled vocabularies to allow consistent use of the terms used to describe and organize the physiologic data. The planned analyses address long-standing questions concerning the phylogenetic distribution of phenotypes involving muscle anatomy and feeding physiology among mammals, the presence and nature of motor pattern conservation in the mammalian feeding muscles, and the extent to which suckling constrains the evolution of feeding behavior in adult mammals. We expect FEED to be a growing digital archive that will facilitate new research into understanding the evolution of feeding anatomy.

  11. Development of a dedicated front-end electronics for straw tube trackers in the bar PANDA experiment

    Science.gov (United States)

    Przyborowski, D.; Fiutowski, T.; Idzik, M.; Kajetanowicz, M.; Korcyl, G.; Salabura, P.; Smyrski, J.; Strzempek, P.; Swientek, K.; Terlecki, P.; Tokarz, J.

    2016-08-01

    The design and tests of front-end electronics for straw tube trackers in the bar PANDA experiment at FAIR are presented. The challenges for the front-end electronics, comprising operation at high counting rate up to 1 MHz per straw tube, are discussed and the proposed architecture comprising a switched gain charge sensitive preamplifier (CSP), a pole-zero cancellation circuit (PZC), a second order variable peaking time shaper, a trimming ion tail cancellation circuit, and a baseline holder (BLH), is described. The front-end provides an analogue output and a discriminator with LVDS differential driver for the Time-of-Arrival (ToA) and Time-over-Threshold (ToT) measurements. A prototype readout ASIC featuring four channels was fabricated in 0.35 μm CMOS technology consuming 15.5 mW (analog part) and 12 mW (LVDS) per channel. The results of measurements of peaking time (25-67 ns), gain, noise (ENC 800-2500 el. for various gains), time walk and jitter are presented as well as the first results obtained with prototype straw tubes connected.

  12. Replacement of major nuclear power plant components for service life extension

    International Nuclear Information System (INIS)

    Novak, S.

    1987-01-01

    Problems are discussed associated with replacement of nuclear power plant components with the aim to extend their original scheduled life. The existing foreign experience shows that it is technically feasible to replace practically all basic components for which the necessity of replacement is established. Data is summed up on the replacement of steam generators in US and West German nuclear power plants showing the duration of the job, the total consumption of manhours, the collective dose equivalent and the cost. Attention is also focused on implemented and projected replacements of circulation pipes in nuclear power plants abroad. Based on these figures, the cost is estimated of the replacement of the reactor vessel and the steam generators for WWER-440 nuclear power plants. The conclusion is arrived at that even based on a conservative estimate, the extension by 20 years of the service life of a nuclear power plant is economically more effective than the construction of a new plant. (Z.M.) 2 tabs., 15 refs., 3 figs

  13. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  14. A comparison of conventional surgery, transcatheter aortic valve replacement, and sutureless valves in "real-world" patients with aortic stenosis and intermediate- to high-risk profile.

    Science.gov (United States)

    Muneretto, Claudio; Alfieri, Ottavio; Cesana, Bruno Mario; Bisleri, Gianluigi; De Bonis, Michele; Di Bartolomeo, Roberto; Savini, Carlo; Folesani, Gianluca; Di Bacco, Lorenzo; Rambaldini, Manfredo; Maureira, Juan Pablo; Laborde, Francois; Tespili, Maurizio; Repossini, Alberto; Folliguet, Thierry

    2015-12-01

    We sought to investigate the clinical outcomes of patients with isolated severe aortic stenosis and an intermediate- to high-risk profile treated by means of conventional surgery (surgical aortic valve replacement), sutureless valve implantation, or transcatheter aortic valve replacement in a multicenter evaluation. Among 991 consecutive patients with isolated severe aortic stenosis and an intermediate- to high-risk profile (Society of Thoracic Surgeons score >4 and logistic European System for Cardiac Operative Risk Evaluation I >10), a propensity score analysis was performed on the basis of the therapeutic strategy: surgical aortic valve replacement (n = 204), sutureless valve implantation (n = 204), and transcatheter aortic valve replacement (n = 204). Primary end points were 30-day mortality and overall survival at 24-month follow-up; the secondary end point was survival free from a composite end point of major adverse cardiac events (defined as cardiac-related mortality, myocardial infarction, cerebrovascular accidents, and major hemorrhagic events) and periprosthetic regurgitation greater than 2. Thirty-day mortality was significantly higher in the transcatheter aortic valve replacement group (surgical aortic valve replacement = 3.4% vs sutureless = 5.8% vs transcatheter aortic valve replacement = 9.8%; P = .005). The incidence of postprocedural was 3.9% in asurgical aortic valve replacement vs 9.8% in sutureless vs 14.7% in transcatheter aortic valve replacement (Prisk factor for overall mortality hazard ratio (hazard ratio, 2.5; confidence interval, 1.1-4.2; P = .018). The use of transcatheter aortic valve replacement in patients with an intermediate- to high-risk profile was associated with a significantly higher incidence of perioperative complications and decreased survival at short- and mid-term when compared with conventional surgery and sutureless valve implantation. Copyright © 2015 The American Association for Thoracic Surgery. Published by

  15. Pickering NGS end of commercial operations

    Energy Technology Data Exchange (ETDEWEB)

    Swami, L. [Ontario Power Generation, Pickering, ON (Canada)

    2015-07-01

    • Pickering continues as a valued asset for the Province • OPG's current business plan is to continue to operate Pickering to the end of 2020 • Planning its shutdown is underway and includes the following activities to: • Place the units into safe store • Manage the wastes arising • Repurpose the Pickering lands and facilities • Decommissioning will take place in the future and will include appropriate waste management activities. © Copyright 2015 by the Canadian Nuclear Society. All rights reserved.

  16. Replacement of steam generators at Dampierre 1 France

    International Nuclear Information System (INIS)

    Bacot, J.; Chorain, M.; Collot, Y.; Dorimini, G.

    1991-01-01

    1990 was the year of the first steam generator replacement operation on EdF's facilities. The site chosen was Dampierre 1 (900 MW PWR unit with 3 primary coolant loops). The project was a thorough success characterized by: (1) A work schedule which was entirely met and even improved on: 70 work days from the end of fuel unloading authorizing start of work in the reactor building up to the end of refitting in readiness for the primary circuit hydraulic tests, i.e. a gain of one week compared with the forecast work schedule, (2) A final dosimetry less than 230 man-rem for a target of 450 man-rem, (3) Safety: no serious accidents during the 300,000 hours worked. It also provided practical proof of French industry's capacity to undertake an SGR operation. (author)

  17. Meal replacements and fibre supplement as a strategy for weight loss. Proprietary PGX® meal replacement and PGX® fibre supplement in addition to a calorie-restricted diet to achieve weight loss in a clinical setting.

    Science.gov (United States)

    Reichert, Ronald G; Reimer, Raylene A; Kacinik, Veronica; Pal, Sebely; Gahler, Roland J; Wood, Simon

    2013-01-01

    Meal replacements and viscous soluble fibre represent safe and sustainable aids for weight loss. Our purpose was to determine if PGX® meal replacements and PGX(®) fibre complex in combination with a calorie-restricted diet would aid in weight loss in a clinical setting. Fifty-two overweight and obese participants (49 women, 3 men; average age 47.1 years) with a mean body mass index (BMI) of 33.8 ± 6.4 kg/m(2) consumed 57 g of proprietary PGX® meal replacement product at breakfast and another 57 g at lunch for 12 weeks. In addition to the meal replacements, they were also asked to consume 5 g/day of PGX® fibre in the form of granules, powder or capsules together with 250 mlwater. A registered dietician recommended low-fat, low-glycaemic-index foods for snacks and the dinner menus such that each volunteer was consuming a total of 1200 kcal/day. All participants (n = 52) lost a significant amount of weight from baseline (-4.69 ± 3.73 kg), which was further reflected in the reductions in their waist (-7.11 ± 6.35 cm) and hip circumference (-5.59 ± 3.58 cm) over the 12-week study (p meal replacements and PGX(®) fibre along with a controlled dietary caloric intake is of benefit for short-term weight loss.

  18. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  19. Effect of preoperative education of patients before hip or knee replacement surgery: A systematic review

    DEFF Research Database (Denmark)

    Aydin, Dogu; Klit, Jakob; Husted, Henrik

    2013-01-01

    Background Total hip (THA) and knee arthroplasty (TKA) are standard procedures for treatment of end stage osteoarthritis, and much is done to optimize results. It is usually hypothesized that education of patients before surgery reduces anxiety, secures more realistic patient expectations...... and enhances postoperative outcomes. Objectives To determine whether results reported in the literature proves an effect of preoperative education on postoperative outcomes in replacement surgery patients regarding anxiety, pain, length of hospital stay, patient satisfaction, postoperative complications...... visual) given by health professionals to patients were included. Results Seven studies involving 677 participants met the inclusion criteria. Two studies involved patients undergoing THA replacement, while five studies involved patients undergoing both THA and TKA replacement surgery. Mean number...

  20. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  1. The Elderly Perceived Meanings and Values of Virtual Reality Leisure Activities: A Means-End Chain Approach

    Directory of Open Access Journals (Sweden)

    Cheng-Shih Lin

    2018-04-01

    Full Text Available This study uses means-end chain (MEC techniques to examine the awareness, decision-making procedure, and personal values of the elderly with regard to virtual reality leisure activities. The results of the study show that elderly respondents value virtual reality leisure activities that are fun, safe, and easy. In terms of outcome benefits, elderly respondents value feeling physically and mentally healthy, firsthand experience, and satisfied curiosity. In value terms, elderly respondents hope that their chosen virtual reality leisure activities improve not only their relationships with others, but also their enjoyment, quality of life, and sense of belonging. The results show that, while consumers with different awarenesses of virtual reality leisure activities have different decision-making processes, they share creating “good memories” as the terminal value with the most significant effect. This presents a potential opportunity to promote virtual reality leisure activities. Relevant bodies or enterprises can seek to create good memories in consumers by developing activities that are safe and fun, promote good health, and provide good service, thereby attracting the interest of elderly consumers.

  2. The Elderly Perceived Meanings and Values of Virtual Reality Leisure Activities: A Means-End Chain Approach

    Science.gov (United States)

    Lin, Cheng-Shih; Jeng, Mei-Yuan

    2018-01-01

    This study uses means-end chain (MEC) techniques to examine the awareness, decision-making procedure, and personal values of the elderly with regard to virtual reality leisure activities. The results of the study show that elderly respondents value virtual reality leisure activities that are fun, safe, and easy. In terms of outcome benefits, elderly respondents value feeling physically and mentally healthy, firsthand experience, and satisfied curiosity. In value terms, elderly respondents hope that their chosen virtual reality leisure activities improve not only their relationships with others, but also their enjoyment, quality of life, and sense of belonging. The results show that, while consumers with different awarenesses of virtual reality leisure activities have different decision-making processes, they share creating “good memories” as the terminal value with the most significant effect. This presents a potential opportunity to promote virtual reality leisure activities. Relevant bodies or enterprises can seek to create good memories in consumers by developing activities that are safe and fun, promote good health, and provide good service, thereby attracting the interest of elderly consumers. PMID:29614012

  3. The Elderly Perceived Meanings and Values of Virtual Reality Leisure Activities: A Means-End Chain Approach.

    Science.gov (United States)

    Lin, Cheng-Shih; Jeng, Mei-Yuan; Yeh, Tsu-Ming

    2018-04-03

    This study uses means-end chain (MEC) techniques to examine the awareness, decision-making procedure, and personal values of the elderly with regard to virtual reality leisure activities. The results of the study show that elderly respondents value virtual reality leisure activities that are fun, safe, and easy. In terms of outcome benefits, elderly respondents value feeling physically and mentally healthy, firsthand experience, and satisfied curiosity. In value terms, elderly respondents hope that their chosen virtual reality leisure activities improve not only their relationships with others, but also their enjoyment, quality of life, and sense of belonging. The results show that, while consumers with different awarenesses of virtual reality leisure activities have different decision-making processes, they share creating "good memories" as the terminal value with the most significant effect. This presents a potential opportunity to promote virtual reality leisure activities. Relevant bodies or enterprises can seek to create good memories in consumers by developing activities that are safe and fun, promote good health, and provide good service, thereby attracting the interest of elderly consumers.

  4. Managing radioactive waste safely. Engaging Scotland

    International Nuclear Information System (INIS)

    Elrick, D.; Boyes, L.; McCormick, J.

    2002-01-01

    Between January and May 2002 the Scottish Council Foundation undertook a research project to assess 1 the level of public awareness about and interest in engaging the public in decision-making on managing radioactive waste safely in Scotland. This paper presents the main findings from the research that involved 70 people from across Scotland, aged between 14 and over 65 years old, and a literature review of Scottish, UK and international experience in engaging the public

  5. The safety of peri-articular local anaesthetic injection for patients undergoing total knee replacement with autologous blood transfusion: a randomised trial.

    Science.gov (United States)

    Wallace, D F; Emmett, S R; Kang, K K; Chahal, G S; Hiskens, R; Balasubramanian, S; McGuinness, K; Parsons, H; Achten, J; Costa, M L

    2012-12-01

    Intra-operative, peri-articular injection of local anaesthesia is an increasingly popular way of controlling pain following total knee replacement. At the same time, the problems associated with allogenic blood transfusion have led to interest in alternative methods for managing blood loss after total knee replacement, including the use of auto-transfusion of fluid from the patient's surgical drain. It is safe to combine peri-articular infiltration with auto-transfusion from the drain. We performed a randomised clinical trial to compare the concentration of local anaesthetic in the blood and in the fluid collected in the knee drain in patients having either a peri-articular injection or a femoral nerve block. Clinically relevant concentrations of local anaesthetic were found in the fluid from the drains of patients having peri-articular injections (4.92 μg/ml (sd 3.151)). However, none of the patients having femoral nerve blockade had detectable levels. None of the patients in either group had clinically relevant concentrations of local anaesthetic in their blood after re-transfusion. The evidence from this study suggests that it is safe to use peri-articular injection in combination with auto-transfusion of blood from peri-articular drains during knee replacement surgery.

  6. The never-ending digital journey creating new consumer experiences through technology

    CERN Document Server

    Angelani, Andres; Migoya, Martin

    2016-01-01

    The Never-Ending Digital Journey provides readers with the concepts and steps needed to create successful user experiences. The authors look ahead and explore digital scenarios of the future. They probe how technology is changing the way users interact with brands, and they address today's digital challenges with new ways of surprising consumers, integrating design and engineering. The authors leverage knowledge gleaned from working with renowned global companies to describe the recipe needed to build a Digital Journey. With a strong focus on Agile Pods, they dive into technolo- gies, processes, team building, motivation, and met- rics that enable businesses to construct and nurture the dynamic ecosystems necessary in this digital era to foster success. Over the last several years, customers, employees, and partners have become tech-savvy users whose expectations of “Give me more and deliver it faster" require manageable solutions. The desire to interact with digital ecosystems anywhere, anytime demands that...

  7. Semi-automated categorization of open-ended questions

    Directory of Open Access Journals (Sweden)

    Matthias Schonlau

    2016-08-01

    Full Text Available Text data from open-ended questions in surveys are difficult to analyze and are frequently ignored. Yet open-ended questions are important because they do not constrain respondents’ answer choices. Where open-ended questions are necessary, sometimes multiple human coders hand-code answers into one of several categories. At the same time, computer scientists have made impressive advances in text mining that may allow automation of such coding. Automated algorithms do not achieve an overall accuracy high enough to entirely replace humans. We categorize open-ended questions soliciting narrative responses using text mining for easy-to-categorize answers and humans for the remainder using expected accuracies to guide the choice of the threshold delineating between “easy” and “hard”. Employing multinomial boosting avoids the common practice of converting machine learning “confidence scores” into pseudo-probabilities. This approach is illustrated with examples from open-ended questions related to respondents’ advice to a patient in a hypothetical dilemma, a follow-up probe related to respondents’ perception of disclosure/privacy risk, and from a question on reasons for quitting smoking from a follow-up survey from the Ontario Smoker’s Helpline. Targeting 80% combined accuracy, we found that 54%-80% of the data could be categorized automatically in research surveys.

  8. A feasibility study to assess the effectiveness of safe dates for teen mothers.

    Science.gov (United States)

    Herrman, Judith W; Waterhouse, Julie K

    2014-01-01

    To determine the effectiveness of the adapted Safe Dates curriculum as an intervention for pregnant and/or parenting teens to prevent teen dating violence (TDV). This pre-/posttest, single-sample study provided a means to assess the effectiveness of an adapted Safe Dates curriculum for teen mothers. The adapted Safe Dates curriculum was implemented in three schools designed for the unique needs of teens who are pregnant and/or parenting. The final sample of 41 teen participants, with a mean age of 16.27, completed 80% of the curriculum and two of the three assessments. Most of the teens were pregnant during participation in the curriculum, and six had infants between age 1 and 3 months. The teen mothers completed the pretest, participated in the 10-session adapted Safe Dates curriculum, and completed the posttest at the end of the program and 1 month after program completion. The pre/posttest was adapted from the Safe Dates curriculum-specific evaluation instrument. Senior, undergraduate nursing students were trained in and implemented the curriculum. Participation in the adapted Safe Dates program yielded significant differences in the areas of responses to anger, gender stereotyping, awareness of resources for perpetrators and victims, and psychological violence perpetration. This adapted program may be effective in changing selected outcomes. The implementation of a larger scale, experimental/control group study may demonstrate the program's efficacy at reducing the incidence of TDV among teen mothers. © 2014 AWHONN, the Association of Women's Health, Obstetric and Neonatal Nurses.

  9. Network analysis on skype end-to-end video quality

    NARCIS (Netherlands)

    Exarchakos, Georgios; Druda, Luca; Menkovski, Vlado; Liotta, Antonio

    2015-01-01

    Purpose – This paper aims to argue on the efficiency of Quality of Service (QoS)-based adaptive streamingwith regards to perceived quality Quality of Experience (QoE). Although QoS parameters are extensivelyused even by high-end adaptive streaming algorithms, achieved QoE fails to justify their use

  10. Attitudes, experiences, and beliefs affecting end-of-life decision-making among homeless individuals.

    Science.gov (United States)

    Tarzian, Anita J; Neal, Maggie T; O'Neil, J Anne

    2005-02-01

    Individuals who are homeless may encounter various barriers to obtaining quality end-of-life (EOL) care, including access barriers, multiple sources of discrimination, and lack of knowledge among health care providers (HCPs) of their preferences and decision-making practices. Planning for death with individuals who have spent so much energy surviving requires an understanding of their experiences and preferences. This study sought to increase HCPs' awareness and understanding of homeless or similarly marginalized individuals' EOL experiences and treatment preferences. Focus groups were conducted with homeless individuals using a semi-structured interview guide to elicit participants' EOL experiences, decision-making practices, and personal treatment preferences. Five focus groups were conducted with 20 inner-city homeless individuals (4 per group) at a free urban health care clinic for homeless individuals in the United States. Sixteen of the 20 participants were African American; 4 were Caucasian. None were actively psychotic. All had experienced multiple losses and drug addiction. Five main themes emerged: valuing an individual's wishes; acknowledging emotions; the primacy of religious beliefs and spiritual experience; seeking relationship-centered care; and reframing advance care planning. The narrative process of this qualitative study uncovered an approach to EOL decision-making in which participants' reasoning was influenced by emotions, religious beliefs, and spiritual experience. Relationship-centered care, characterized by compassion and respectful, two-way communication, was obvious by its described absence--reasons for this are discussed. Recommendations for reframing advance care planning include ways for HCPs to transform advance care planning from that of a legal document to a process of goal-setting that is grounded in human connection, respect, and understanding.

  11. Process and device for replacing heater in PWR pressurizer

    International Nuclear Information System (INIS)

    Gente, D.; Giron, M.

    1990-01-01

    To assure the tight fixation of replacing heater on a pressurizer penetration sleeve, a gas metal-arc welding single pass is executed. A tubular shaft is fixed over end of heater projecting from penetration sleeve. Over shaft is fixed tubular support for the torch which can rotate about axis of support axis heater. Welding torch and welding wire feeder roll are rotated in synchronisation by appropriate motors. Weld is made in single pass round periphery of heater and penetration sleeve [fr

  12. Electronic nicotine delivery system (ENDS) use during smoking cessation: a qualitative study of 40 Oklahoma quitline callers.

    Science.gov (United States)

    Vickerman, Katrina A; Beebe, Laura A; Schauer, Gillian L; Magnusson, Brooke; King, Brian A

    2017-04-01

    Approximately 10% (40 000) of US quitline enrollees who smoke cigarettes report current use of electronic nicotine delivery systems (ENDS); however, little is known about callers' ENDS use. Our aim was to describe why and how quitline callers use ENDS, their beliefs about ENDS and the impact of ENDS use on callers' quit processes and use of FDA-approved cessation medications. Qualitative interviews conducted 1-month postregistration. Interviews were recorded, transcribed, double-coded and analysed to identify themes. Oklahoma Tobacco Helpline. 40 callers aged ≥18 who were seeking help to quit smoking were using ENDS at registration and completed ≥1 programme calls. At 1-month postregistration interview, 80% of callers had smoked cigarettes in the last 7 days, almost two-thirds were using ENDS, and half were using cessation medications. Nearly all believed ENDS helped them quit or cut down on smoking; however, participants were split on whether they would recommend cessation medications, ENDS or both together for quitting. Confusion and misinformation about potential harms of ENDS and cessation medications were reported. Participants reported using ENDS in potentially adaptive ways (eg, using ENDS to cut down and nicotine replacement therapy to quit, and stepping down nicotine in ENDS to wean off ENDS after quitting) and maladaptive ways (eg, frequent automatic ENDS use, using ENDS in situations they did not previously smoke, cutting down on smoking using ENDS without a schedule or plan to quit), which could impact the likelihood of quitting smoking or continuing ENDS use. These qualitative findings suggest quitline callers who use ENDS experience confusion and misinformation about ENDS and FDA-approved cessation medications. Callers also use ENDS in ways that may not facilitate quitting smoking. Opportunities exist for quitlines to educate ENDS users and help them create a coordinated plan most likely to result in completely quitting combustible tobacco

  13. Procedure of safe handling with cytostatic drugs

    Directory of Open Access Journals (Sweden)

    Kodžo Dragan

    2003-01-01

    Full Text Available Working group for safe handling with cytostatic drugs has been formed by the Ministry of Health, and it consists of professionals from IORS, Federal Bureau of Weights and Measures, Industrial Medicine, Institute of Hematology, Military Medical Academy, and Crown Agents. The aim of this working group is to prepare procedures for safe handling with cytostatic drugs, as well as program for educational seminar for nurses, medical technicians, and pharmaceutical technicians. The procedures will serve as a guide of good practice of oncology health care, and will refer to all actions that health care professionals carry out from the moment of drugs arrival to the pharmacy to the moment of their application. In the first segment of this procedure, general rules are given for working with cytotoxic agents, control for risky exposures, safe system of work, control of working environment, monitoring of the employees' health condition adequate protection in the working environment, protective equipment of the employees (gloves, mask, cap, eyeglasses, shoe covers, coats and chambers for vertical laminary air stream. Storing of cytostatics, procedure in case of accident, and waste handling and removal are also described in this segment. Fifty-three standard operational procedures are described in detail in the second segment. Training scheme for preparation of chemotherapy is given in the third segment - education related to various fields and practical part, which would be carried out through workshops, and at the end of the course participants would pass a test and obtain certificate. After the procedures for safe handling with cytostatics are legally regulated employer will have to provide minimum of protective equipment, special rooms for the drugs dissolving, chambers with laminar airflow, 6 hours working time, rotation of the staff working with drugs dissolving in intervals of every five years, higher efficiency, better health control. In conclusion

  14. An Empirical Comparison of Discrete Choice Experiment and Best-Worst Scaling to Estimate Stakeholders' Risk Tolerance for Hip Replacement Surgery.

    Science.gov (United States)

    van Dijk, Joris D; Groothuis-Oudshoorn, Catharina G M; Marshall, Deborah A; IJzerman, Maarten J

    2016-06-01

    Previous studies have been inconclusive regarding the validity and reliability of preference elicitation methods. The aim of this study was to compare the metrics obtained from a discrete choice experiment (DCE) and profile-case best-worst scaling (BWS) with respect to hip replacement. We surveyed the general US population of men aged 45 to 65 years, and potentially eligible for hip replacement surgery. The survey included sociodemographic questions, eight DCE questions, and twelve BWS questions. Attributes were the probability of a first and second revision, pain relief, ability to participate in sports and perform daily activities, and length of hospital stay. Conditional logit analysis was used to estimate attribute weights, level preferences, and the maximum acceptable risk (MAR) for undergoing revision surgery in six hypothetical treatment scenarios with different attribute levels. A total of 429 (96%) respondents were included. Comparable attribute weights and level preferences were found for both BWS and DCE. Preferences were greatest for hip replacement surgery with high pain relief and the ability to participate in sports and perform daily activities. Although the estimated MARs for revision surgery followed the same trend, the MARs were systematically higher in five of the six scenarios using DCE. This study confirms previous findings that BWS or DCEs are comparable in estimating attribute weights and level preferences. However, the risk tolerance threshold based on the estimation of MAR differs between these methods, possibly leading to inconsistency in comparing treatment scenarios. Copyright © 2016 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  15. [End-of-life and euthanasia, an intensive care team's experience].

    Science.gov (United States)

    Baruteau, J; Devilliers, A; François, I; Blettery, B

    2002-04-20

    The improvement in the medical techniques used in intensive care units over the last 30 years has led to a different approach towards the end of life and death. Our study has underlined the feelings of all the staff of an intensive care unit towards the various difficulties engendered by death and the question of euthanasia. Conducted in the particular context of an intensive care unit, this work is a survey on the staff's feelings and factual experiences, in order to promote discussions on this painful subject. Sixty-one percent of the persons surveyed declared that euthanasia was ethically acceptable. The patients take the initiative of the request (92%) and the cohesion of the team is unanimously required. Pain and corporeal deterioration are the first motivations. Euthanasia is a difficult question, sometimes impassionate, and the care units have to consider whether they are concerned by the quality of their patients' care. The press regularly issues reports on this. But beyond these quantified questions, the staff who care for these ill patients are often very discreet. The regular confrontation with this situation changes the medical team's view of the profession.

  16. End-of-Life Nursing Care and Education: End-of-Life Nursing Education: Past and Present.

    Science.gov (United States)

    DʼAntonio, Jocelyn

    The dying experience is forever carried in the life story of those for whom the nurse cares. A goal of end-of-life nursing education is to produce nurses who are comfortable with death and dying and who have had the opportunity to reflect on their thoughts and feelings about end-of-life care. This article reviews the history, development, and teaching methods of end-of-life care, offering recommendations for future education.

  17. Heavy-atom neutral beams for tandem-mirror end plugs

    International Nuclear Information System (INIS)

    Post, D.E.; Grisham, L.R.; Santarius, J.F.; Emmert, G.A.

    1981-05-01

    The advantages of neutral beams with Z greater than or equal to 3 formed from negative ions, accelerated to 0.5 to 1.0 MeV/amu, and neutralized with high efficiency, are investigated for use in tandem mirror reactor end plugs. These beams can produce Q's of 20 to 30, and thus can replace the currently proposed 200 to 500 keV neutral proton beams presently planned for tandem mirror reactors. Thus, these Z greater than or equal to 3 neutral beams increase the potential attractiveness of tandem mirror reactors by offering a substitute for difficult high energy neutral hydrogen end plug beams

  18. Esophageal replacement in children: Challenges and long-term outcomes

    Directory of Open Access Journals (Sweden)

    Giampiero Soccorso

    2016-01-01

    Full Text Available Replacement of a nonexistent or damaged esophagus continues to pose a significant challenge to pediatric surgeons. Various esophageal replacement grafts and techniques have not produced consistently good outcomes to emulate normal esophagus. Therefore, many techniques are still being practiced and recommended with no clear consensus. We present a concise literature review of the currently used techniques and with discussions on the advantages and anticipated morbidity. There are no randomized controlled pediatric studies to compare different types of esophageal replacements. Management and graft choice are based on geographical and personal predilections rather than on any discernible objective data. The biggest series with long-term outcome are reported for gastric transposition and colonic replacement. Comparison of different studies shows no significant difference in early (graft necrosis and anastomotic leaks or late complications (strictures, poor feeding, gastro-esophageal reflux, tortuosity of the graft, and Barrett′s esophagus. The biggest series seem to have lower complications than small series reflecting the decennials experience in their respective centers. Long-term follow-up is recommended following esophageal replacement for the development of late strictures, excessive tortuosity, and Barrett′s changes within the graft. Once child overcomes initial morbidity and establishes oral feeding, long-term consequences and complications of pediatric esophageal replacement should be monitored and managed in adult life.

  19. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    The main intention of this paper is to present feedback from the implementation of the new Turbine Control System (TCS) replacement project at Nuclear Power Plant (NPP) NEK - Krsko. From the plant construction time and the first plant start-up in 1981, the NPP NEK TG (Turbine-Generator) set was controlled and monitored by DEH (Digital Electro Hydraulic) Mod II Control System designed in 70's based on P2500 CPU and number of I/O controllers and modules. The P2500 CPU and associated controllers were built with discrete TTL components (TTL logic chips) and the P2500 CPU had 64k of 16 bit words of ferrite core memory. For that time, DEH Mod II had sophisticated MCR (Main Control Room) HMI (Human Machine Interface) based on digital functional keyboards, one alphanumeric black and white CRT monitor and printer. After twenty eight years of operation and because of several other reasons that are explained in the paper, NEK decided to replace the old DEH Mod II Control system with the new Emerson Ovation based DCS (Distributed Control System) on redundant platform for the control and monitoring of secondary plant systems in the NPP Krsko (NEK), and the new system was named PDEH (Programmable Digital Electro Hydraulic) TCS. In May 2007, NEK signed the turn-key contract with Westinghouse Electric Company (WEC) for the project of replacement of the TCS, Turbine Emergency Trip System (ETS), Moisture Separator Reheater (MSR) control and some other control and monitoring functions. WEC subcontracted a number of other companies for equipment delivery, AE (Architect Engineering Design) activities, specific software development tasks (changes of KFSS - Krsko Full Scope Simulator and PIS - Process Information System interface) and field installation activities. The subject project enveloped implementation of PDEH system on three application platforms: BG KFSS (Background KFSS), FG KFSS (Foreground KFSS) and PDEH system installed in the plant. The HMI for the BG KFSS platform

  20. Development and evaluation of the EOL-ICDQ as a measure of experiences, attitudes and knowledge in end-of-life in patients living with an implantable cardioverter defibrillator.

    Science.gov (United States)

    Thylén, Ingela; Wenemark, Marika; Fluur, Christina; Strömberg, Anna; Bolse, Kärstin; Årestedt, Kristofer

    2014-04-01

    Due to extended indications and resynchronization therapy, many implantable cardioverter defibrillator (ICD) recipients will experience progressive co-morbid conditions and will be more likely to die of causes other than cardiac death. It is therefore important to elucidate the ICD patients' preferences when nearing end-of-life. Instead of avoiding the subject of end-of-life, a validated questionnaire may be helpful to explore patients' experiences and attitudes about end-of-life concerns and to assess knowledge of the function of the ICD in end-of-life. Validated instruments assessing patients' perspective concerning end-of-life issues are scarce. The purpose of this study was to develop and evaluate respondent satisfaction and measurement properties of the 'Experiences, Attitudes and Knowledge of End-of-Life Issues in Implantable Cardioverter Defibrillator Patients' Questionnaire' (EOL-ICDQ). The instrument was tested for validity, respondent satisfaction, and for homogeneity and stability in the Swedish language. An English version of the EOL-ICDQ was validated, but has not yet been pilot tested. The final instrument contained three domains, which were clustered into 39 items measuring: experiences (10 items), attitudes (18 items), and knowledge (11 items) of end-of-life concerns in ICD patients. In addition, the questionnaire also contained items on socio-demographic background (six items) and ICD-specific background (eight items). The validity and reliability properties were considered sufficient. The EOL-ICDQ has the potential to be used in clinical practice and future research. Further studies are needed using this instrument in an Anglo-Saxon context with a sample of English-speaking ICD recipients.

  1. The effect of replacing lactose by starch on protein and fat digestion in milk-fed veal calves

    NARCIS (Netherlands)

    Pluschke, A.M.; Gilbert, M.S.; Williams, B.A.; Borne, van den J.J.G.C.; Schols, H.A.; Gerrits, W.J.J.

    2016-01-01

    Replacing dairy components from milk replacer (MR) with vegetable products has been previously associated with decreased protein and fat digestibility in milk-fed calves resulting in lower live weight gain. In this experiment, the major carbohydrate source in MR, lactose, was partly replaced with

  2. Fuel element replacement and cooling water radioactivity at the Musashi reactor

    International Nuclear Information System (INIS)

    Nozaki, T.; Honda, T.; Horiuchi, N.; Aizawa, O.; Sato, T.

    1988-01-01

    The Musashi reactor (TRIGA-II, 100kW) has been operated without any serious troubles since 1963. In 1985 the old Al-cladded fuel elements were replaced with new stainless cladded ones in order to insure a long and safe operation. By using a semi-automatic equipment the old fuel elements have been transferred into the bulk-shielding experimental pool, which was remodelled for the spent-fuel storage. In order to reduce the exposure during the transfer work, the old fuel elements were cooled in the core tank for 3 months. After the replacement, the radioactivities in the cooling water have been drastically changed. The activity of Na-24 decreased about one decade, and the activities of Cr-51, Mn-54, Mn-56, Co-58 and Co-60 increased about two decades. At this conference we will report on the following points: (1) semi-automatic equipment for the transportation of the Al-cladded spent fuel, (2) structure of spent-fuel storage pool, and (3) radioactivity change in the cooling water. (author)

  3. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  4. The recent fall in postperinatal mortality in New Zealand and the Safe Sleep programme.

    Science.gov (United States)

    Mitchell, Edwin A; Cowan, Stephanie; Tipene-Leach, David

    2016-11-01

    Postneonatal mortality rates changed very little from 2000 until recently. There has been a decrease in mortality in New Zealand from 2009 to 2015. This study describes an infant Safe Sleep programme and postulates it is the cause for the recent decrease in deaths. The Safe Sleep programme involved as follows: a focus on preventing accidental suffocation, a 'blitz' approach to SUDI education, the targeted provision of portable infant Safe Sleep devices (ISSD) and the development of Safe Sleep policy across all district health boards (DHBs). Participation in the education 'blitz' by health professionals exceeded one in 23 live births, distribution of Safe Sleep leaflets exceeded two for every live birth, and over 16 500 ISSDs have been distributed to vulnerable infants. Postperinatal mortality fell 29% from 2009 to 2015 (2.8 to 2.0/1000 live births). The fall has been greatest for Māori and in regions with the most intensive programmes. The recent fall in postperinatal mortality has not happened by chance. It is likely that the components of end-stage prevention strategy, a focus on preventing accidental suffocation, the education 'blitz', the targeted supply of ISSDs and strengthened health policy, have all contributed to varying degrees. ©2016 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  5. Fast front-end electronics for COMPASS MWPCs

    CERN Document Server

    Colantoni, M L; Ferrero, A; Frolov, V; Grasso, A; Heinz, S; Maggiora, A; Maggiora, M G; Panzieri, D; Popov, A; Tchalyshev, V

    2000-01-01

    In the COMPASS experiment, under construction at CERN, about 23000 channels of MWPCs will be used. The very high rate of the muon and hadron beams, and the consequently high trigger rate, require front- end electronics with innovative conceptual design. A new MWPC front- end electronics that fulfills the main COMPASS requirement to have a fast DAQ with a minimum dead-time has been designed. The general concept of the front-end cards is described; the comparative tests of two front-end chips, and different fast gas mixtures, are also shown. The commissioning of the experiment will start in the summer 2000, and production running, using the muon beam, is foreseen for the year 2001. (8 refs).

  6. The safe use of radiation sources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    As a means of promoting safety in the use of radiation sources, as well as encouraging consistency in regulatory control, the IAEA has from time to time organized training courses with the co-operation of Member State governments and organizations, to inform individuals from developing countries with appropriate responsibilities on the provisions for the safe use and regulation of radiation sources. Three such courses on the safe use of radiation sources have been held in both the USA, with the co-operation of the United States Government, and in Dublin, Ireland, with the co-operation of the Irish Government. The Training Course on the Safe Use and Regulation of Radiation Sources has been successfully given to over 77 participants from over 30 countries during the last years. The course is aimed at providing a basis of radiation protection knowledge in all aspects of the uses of radiation and of radiation sources that are used today. It is the intention of this course to provide a systematic enhancement of radioisotope safety in countries with developing radiological programmes through a core group of national authorities. The IAEA's training programmes provide an excellent opportunity for direct contact with lecturers that have extensive experience in resolving issues faced by developing countries and in providing guidance documents useful in addressing their problems. This document uses this collective experience and provides valuable technical information regarding the safety aspects of the uses not only of sealed and unsealed sources of radiation, but also for those machines that produce ionizing radiation. The first of these training courses, 'Safety and Regulation of Unsealed Sources' was held in Dublin, Ireland, June through July 1989 with the co-operation of the Nuclear Energy Board and Trinity College. This was an interregional training course, the participants came from all over the world. The second and third interregional courses, 'Safety and Regulation

  7. The safe use of radiation sources

    International Nuclear Information System (INIS)

    1995-01-01

    As a means of promoting safety in the use of radiation sources, as well as encouraging consistency in regulatory control, the IAEA has from time to time organized training courses with the co-operation of Member State governments and organizations, to inform individuals from developing countries with appropriate responsibilities on the provisions for the safe use and regulation of radiation sources. Three such courses on the safe use of radiation sources have been held in both the USA, with the co-operation of the United States Government, and in Dublin, Ireland, with the co-operation of the Irish Government. The Training Course on the Safe Use and Regulation of Radiation Sources has been successfully given to over 77 participants from over 30 countries during the last years. The course is aimed at providing a basis of radiation protection knowledge in all aspects of the uses of radiation and of radiation sources that are used today. It is the intention of this course to provide a systematic enhancement of radioisotope safety in countries with developing radiological programmes through a core group of national authorities. The IAEA's training programmes provide an excellent opportunity for direct contact with lecturers that have extensive experience in resolving issues faced by developing countries and in providing guidance documents useful in addressing their problems. This document uses this collective experience and provides valuable technical information regarding the safety aspects of the uses not only of sealed and unsealed sources of radiation, but also for those machines that produce ionizing radiation. The first of these training courses, 'Safety and Regulation of Unsealed Sources' was held in Dublin, Ireland, June through July 1989 with the co-operation of the Nuclear Energy Board and Trinity College. This was an interregional training course, the participants came from all over the world. The second and third interregional courses, 'Safety and Regulation

  8. SAFE Newsletter

    OpenAIRE

    2013-01-01

    The Center of Excellence SAFE – “Sustainable Architecture for Finance in Europe” – is a cooperation of the Center for Financial Studies and Goethe University Frankfurt. It is funded by the LOEWE initiative of the State of Hessen (Landes-Offensive zur Entwicklung wissenschaftlich-ökonomischer Exzellenz). SAFE brings together more than 40 professors and just as many junior researchers who are all dedicated to conducting research in support of a sustainable financial architecture. The Center has...

  9. Beta-Cell Replacement: Pancreas and Islet Cell Transplantation.

    Science.gov (United States)

    Niclauss, Nadja; Meier, Raphael; Bédat, Benoît; Berishvili, Ekaterine; Berney, Thierry

    2016-01-01

    Pancreas and islet transplantation are 2 types of beta-cell replacement therapies for type 1 diabetes mellitus. Since 1966, when pancreas transplantation was first performed, it has evolved to become a highly efficient procedure with high success rates, thanks to advances in surgical technique and immunosuppression. Pancreas transplantation is mostly performed as simultaneous pancreas-kidney transplantation in patients with end-stage nephropathy secondary to diabetes. In spite of its efficiency, pancreas transplantation is still a major surgical procedure burdened by high morbidity, which called for the development of less invasive and hazardous ways of replacing beta-cell function in the past. Islet transplantation was developed in the 1970s as a minimally invasive procedure with initially poor outcomes. However, since the report of the 'Edmonton protocol' in 2000, the functional results of islet transplantation have substantially and constantly improved and are about to match those of whole pancreas transplantation. Islet transplantation is primarily performed alone in nonuremic patients with severe hypoglycemia. Both pancreas transplantation and islet transplantation are able to abolish hypoglycemia and to prevent or slow down the development of secondary complications of diabetes. Pancreas transplantation and islet transplantation should be seen as two complementary, rather than competing, therapeutic approaches for beta-cell replacement that are able to optimize organ donor use and patient care. © 2016 S. Karger AG, Basel.

  10. Periodic Peritoneal Dialysis in End Stage Renal Disease: Is it Still ...

    African Journals Online (AJOL)

    ... replacement therapy out of reach of many patients with end stage renal disease (ESRD). Repeated puncture PD although inferior to HD biochemically, is easily and freely available across Rajasthan, India, and is simple to perform, and does not require sophisticated machines, thus making it an attractive option for dialysis ...

  11. Selective Heart, Brain and Body Perfusion in Open Aortic Arch Replacement.

    Science.gov (United States)

    Maier, Sven; Kari, Fabian; Rylski, Bartosz; Siepe, Matthias; Benk, Christoph; Beyersdorf, Friedhelm

    2016-09-01

    Open aortic arch replacement is a complex and challenging procedure, especially in post dissection aneurysms and in redo procedures after previous surgery of the ascending aorta or aortic root. We report our experience with the simultaneous selective perfusion of heart, brain, and remaining body to ensure optimal perfusion and to minimize perfusion-related risks during these procedures. We used a specially configured heart-lung machine with a centrifugal pump as arterial pump and an additional roller pump for the selective cerebral perfusion. Initial arterial cannulation is achieved via femoral artery or right axillary artery. After lower body circulatory arrest and selective antegrade cerebral perfusion for the distal arch anastomosis, we started selective lower body perfusion simultaneously to the selective antegrade cerebral perfusion and heart perfusion. Eighteen patients were successfully treated with this perfusion strategy from October 2012 to November 2015. No complications related to the heart-lung machine and the cannulation occurred during the procedures. Mean cardiopulmonary bypass time was 239 ± 33 minutes, the simultaneous selective perfusion of brain, heart, and remaining body lasted 55 ± 23 minutes. One patient suffered temporary neurological deficit that resolved completely during intensive care unit stay. No patient experienced a permanent neurological deficit or end-organ dysfunction. These high-risk procedures require a concept with a special setup of the heart-lung machine. Our perfusion strategy for aortic arch replacement ensures a selective perfusion of heart, brain, and lower body during this complex procedure and we observed excellent outcomes in this small series. This perfusion strategy is also applicable for redo procedures.

  12. Analog front end circuit design of CSNS beam loss monitor system

    International Nuclear Information System (INIS)

    Xiao Shuai; Guo Xian; Tian Jianmin; Zeng Lei; Xu Taoguang; Fu Shinian

    2013-01-01

    The China Spallation Neutron Source (CSNS) beam loss monitor system uses gas ionization chamber to detect beam losses. The output signals from ionization chamber need to be processed in the analog front end circuit, which has been designed and developed independently. The way of transimpedance amplifier was used to achieve current-voltage (I-V) conversion measurement of signal with low repetition rate, low duty cycle and low amplitude. The analog front end circuit also realized rapid response to the larger beam loss in order to protect the safe operation of the accelerator equipment. The testing results show that the analog front end circuit meets the requirements of beam loss monitor system. (authors)

  13. The use of port-a-caths in adult patients with Lysosomal Storage Disorders receiving Enzyme Replacement Therapy-one centre experience

    Directory of Open Access Journals (Sweden)

    Mairead McLoughlin

    2017-12-01

    Full Text Available Port-a-cath is a widely used device in patients with long-term venous access demand such as frequent or continuous administration of medications such as Enzyme Replacement Therapy (ERT, chemotherapy delivery, blood transfusions, blood products, and fluids. Patients with Lysosomal Storage Diseases (LSDs often require recurrent courses of ERT. We reviewed our experience of using port-a-caths in patients with LSDs with the focus on challenges and complications associated with these catheters. Among 245 adult patients who were treated with ERT, twenty patients (8.2% had a port-a-cath inserted due to poor venous access. Six patients were using their first port whereas five other patients had their port-a-caths replaced at least once. The remaining six patients had inactive port-a-caths. The majority of patients with active port-a-caths never missed more than one consecutive infusion, although one patient missed 2 consecutive infusions whilst on holiday. We identified significant gaps in patients' and their families' understanding of the management of port-a-caths and risks associated with them. It resulted in producing a leaflet and designing an educational program for our LSD patients.

  14. Evaluation of total alloplastic temporo-mandibular joint replacement with two different types of prostheses: A three-year prospective study.

    Science.gov (United States)

    Gonzalez-Perez, L-M; Gonzalez-Perez-Somarriba, B; Centeno, G; Vallellano, C; Montes-Carmona, J-F

    2016-11-01

    Temporo-Mandibular Joint (TMJ) replacement has been used clinically for years. The objective of this study was to evaluate outcomes achieved in patients with two different categories of TMJ prostheses. All patients who had a TMJ replacement (TMJR) implanted during the study period from 2006 through 2012 were included in this 3-year prospective study. All procedures were performed using the Biomet Microfixation TMJ Replacement System, and all involved replacing both the skull base component (glenoid fossa) and the mandibular condyle. Fifty-seven patients (38 females and 19 males), involving 75 TMJs with severe disease requiring reconstruction (39 unilateral, 18 bilateral) were operated on consecutively, and 68 stock prostheses and 7 custom-made prostheses were implanted. The mean age at surgery was 52.6±11.5 years in the stock group and 51.8±11.7 years in the custom-made group. In the stock group, after three years of TMJR, results showed a reduction in pain intensity from 6.4±1.4 to 1.6±1.2 (p<0.001), and an improvement in jaw opening from 2.7±0.9 cm to 4.2±0.7 cm (p<0.001). In the custom-made group, after three years of TMJR, results showed a reduction in pain intensity from 6.0±1.6 to 2.2±0.4 (p<0.001), and an improvement in jaw opening from 1.5±0.5 cm to 4.3±0.6 cm (p<0.001). No statistically significant differences between two groups were detected. The results of this three-year prospective study support the surgical placement of TMJ prostheses (stock prosthetic, and custom-made systems), and show that the approach is efficacious and safe, reduces pain, and improves maximum mouth opening movement, with few complications. As such, TMJR represents a viable technique and a stable long-term solution for cranio-mandibular reconstruction in patients with irreversible end-stage TMJ disease. Comparing stock and custom-made groups, no statistically significant differences were detected with respect to pain intensity reduction and maximum mouth opening

  15. Development of a dedicated front-end electronics for straw tube trackers in the P-bar ANDA experiment

    International Nuclear Information System (INIS)

    Przyborowski, D.; Fiutowski, T.; Idzik, M.; Swientek, K.; Terlecki, P.; Tokarz, J.; Kajetanowicz, M.; Korcyl, G.; Salabura, P.; Smyrski, J.; Strzempek, P.

    2016-01-01

    The design and tests of front-end electronics for straw tube trackers in the P-bar ANDA experiment at FAIR are presented. The challenges for the front-end electronics, comprising operation at high counting rate up to 1 MHz per straw tube, are discussed and the proposed architecture comprising a switched gain charge sensitive preamplifier (CSP), a pole-zero cancellation circuit (PZC), a second order variable peaking time shaper, a trimming ion tail cancellation circuit, and a baseline holder (BLH), is described. The front-end provides an analogue output and a discriminator with LVDS differential driver for the Time-of-Arrival (ToA) and Time-over-Threshold (ToT) measurements. A prototype readout ASIC featuring four channels was fabricated in 0.35 μm CMOS technology consuming 15.5 mW (analog part) and 12 mW (LVDS) per channel. The results of measurements of peaking time (25–67 ns), gain, noise (ENC 800–2500 el. for various gains), time walk and jitter are presented as well as the first results obtained with prototype straw tubes connected.

  16. FELIX: a High-Throughput Network Approach for Interfacing to Front End Electronics for ATLAS Upgrades

    International Nuclear Information System (INIS)

    Anderson, J; Drake, G; Ryu, S; Zhang, J; Borga, A; Boterenbrood, H; Schreuder, F; Vermeulen, J; Chen, H; Chen, K; Lanni, F; Francis, D; Gorini, B; Miotto, G Lehmann; Schumacher, J; Vandelli, W; Levinson, L; Narevicius, J; Roich, A; Plessl, C

    2015-01-01

    The ATLAS experiment at CERN is planning full deployment of a new unified optical link technology for connecting detector front end electronics on the timescale of the LHC Run 4 (2025). It is estimated that roughly 8000 GBT (GigaBit Transceiver) links, with transfer rates up to 10.24 Gbps, will replace existing links used for readout, detector control and distribution of timing and trigger information. A new class of devices will be needed to interface many GBT links to the rest of the trigger, data-acquisition and detector control systems. In this paper FELIX (Front End LInk eXchange) is presented, a PC-based device to route data from and to multiple GBT links via a high-performance general purpose network capable of a total throughput up to O(20 Tbps). FELIX implies architectural changes to the ATLAS data acquisition system, such as the use of industry standard COTS components early in the DAQ chain. Additionally the design and implementation of a FELIX demonstration platform is presented and hardware and software aspects will be discussed. (paper)

  17. Electropolishing of replacement steam generator channel heads at Millstone-2 PWR

    International Nuclear Information System (INIS)

    Hudson, M.J.B.; Raney, H.; Raney, D.; Spalaris, C.N.

    1992-07-01

    A field application of EPRI-developed steam generator electropolishing technique was performed at Millstone-2 PWR. The process was qualified under previous programs on a laboratory scale, but it was thought appropriate to scale up application to full size components. Replacement of steam generators at Millstone-2 provided a unique opportunity to demonstrate that electropolishing can be applied safely and at a cost which was judged to be recoverable after a small number of fuel cycles. The project, preparation, electropolishing and cleanup, was completed at the reactor site in 25 working days. An alternate, less costly electrolyte solution was qualified for use in future applications

  18. Target Trailing With Safe Navigation With Colregs for Maritime Autonomous Surface Vehicles

    Science.gov (United States)

    Kuwata, Yoshiaki (Inventor); Wolf, Michael T. (Inventor); Zarzhitsky, Dimitri V. (Inventor); Aghazarian, Hrand (Inventor); Huntsberger, Terrance L. (Inventor); Howard, Andrew B. (Inventor)

    2014-01-01

    Systems and methods for operating autonomous waterborne vessels in a safe manner. The systems include hardware for identifying the locations and motions of other vessels, as well as the locations of stationary objects that represent navigation hazards. By applying a computational method that uses a maritime navigation algorithm for avoiding hazards and obeying COLREGS using Velocity Obstacles to the data obtained, the autonomous vessel computes a safe and effective path to be followed in order to accomplish a desired navigational end result, while operating in a manner so as to avoid hazards and to maintain compliance with standard navigational procedures defined by international agreement. The systems and methods have been successfully demonstrated on water with radar and stereo cameras as the perception sensors, and integrated with a higher level planner for trailing a maneuvering target.

  19. The Wonderland of Operating the ALICE Experiment

    CERN Document Server

    Augustinus, A; Pinazza, O; Rosinský, P; Lechman, M; Jirdén, L; Chochula, P

    2011-01-01

    ALICE is one of the experiments at the Large Hadron Collider (LHC), CERN, Geneva, Switzerland. Composed of 18 sub-detectors each with numerous subsystems that need to be controlled and operated in a safe and efficient way. The Detector Control System (DCS) is the key to this and has been used by detector experts with success during the commissioning of the individual detectors. During the transition from commissioning to operation, more and more tasks were transferred from detector experts to central operators. By the end of the 2010 datataking campaign, the ALICE experiment was run by a small crew of central operators, with only a single controls operator. The transition from expert to non-expert operation constituted a real challenge in terms of tools, documentation and training. A relatively high turnover and diversity in the operator crew that is specific to the HEP experiment environment (as opposed to the more stable operation crews for accelerators) made this challenge even bigger. Thi...

  20. Comparing the level of dexterity offered by latex and nitrile SafeSkin gloves.

    Science.gov (United States)

    Sawyer, Jo; Bennett, Allan

    2006-04-01

    An increase in the occurrence of latex allergy has been concurrent with the increasing use of latex gloves by laboratory and healthcare workers. In recent years nitrile gloves have been used to replace latex gloves to prevent latex allergy. Nitrile gloves offer a comparable level of protection against chemical and biological agents and are more puncture resistant. However, if manual dexterity is compromised by nitrile gloves to a greater degree than latex then this may increase the risk of sharps injuries. The Purdue pegboard test, which measures both gross and fine finger dexterity, was used to test the dexterity levels of two glove types used at HPA CEPR; Kimberly-Clark SafeSkin nitrile and latex laboratory gloves. There was a statistically significant 8.6% increase in fine finger dexterity provided by latex compared with nitrile SafeSkin laboratory gloves but no difference in gross dexterity between the glove types. There was no significant relationship between glove dexterity and age or gender. The selection of glove size was influenced by the digit length of participants. Moreover, those with longer, thinner fingers appeared to have an advantage when using nitrile SafeSkin gloves. The level of dexterity provided by latex and nitrile SafeSkin gloves for tasks on a gross dexterity level are comparable and health workers will benefit from the non-allergenic properties of nitrile. For tasks requiring fine finger dexterity nitrile SafeSkin gloves may impede dexterity. Despite this, the degree of restriction appears to have a negligible impact on safety in this study when compared with the risk of latex sensitization and subsequent allergy. In addition to glove material, working practices must also take into account glove size, fit, grip and thickness, as these factors can all influence dexterity.

  1. Contact stresses, pressure and area in a fixed-bearing total ankle replacement: a finite element analysis.

    Science.gov (United States)

    Martinelli, Nicolo; Baretta, Silvia; Pagano, Jenny; Bianchi, Alberto; Villa, Tomaso; Casaroli, Gloria; Galbusera, Fabio

    2017-11-25

    Mobile-bearing ankle implants with good clinical results continued to increase the popularity of total ankle arthroplasty to address endstage ankle osteoarthritis preserving joint movement. Alternative solutions used fixed-bearing designs, which increase stability and reduce the risk of bearing dislocation, but with a theoretical increase of contact stresses leading to a higher polyethylene wear. The purpose of this study was to investigate the contact stresses, pressure and area in the polyethylene component of a new total ankle replacement with a fixed-bearing design, using 3D finite element analysis. A three-dimensional finite element model of the Zimmer Trabecular Metal Total Ankle was developed and assembled based on computed tomography images. Three different sizes of the polyethylene insert were modeled, and a finite element analysis was conducted to investigate the contact pressure, the von Mises stresses and the contact area of the polyethylene component during the stance phase of the gait cycle. The peak value of pressure was found in the anterior region of the articulating surface, where it reached 19.8 MPa at 40% of the gait cycle. The average contact pressure during the stance phase was 6.9 MPa. The maximum von Mises stress of 14.1 MPa was reached at 40% of the gait cycle in the anterior section. In the central section, the maximum von Mises stress of 10.8 MPa was reached at 37% of the gait cycle, whereas in the posterior section the maximum stress of 5.4 MPa was reached at the end of the stance phase. The new fixed-bearing total ankle replacement showed a safe mechanical behavior and many clinical advantages. However, advanced models to quantitatively estimate the wear are need. To the light of the clinical advantages, we conclude that the presented prosthesis is a good alternative to the other products present in the market.

  2. Amyotrophic lateral sclerosis: the Midwestern surgical experience with the diaphragm pacing stimulation system shows that general anesthesia can be safely performed.

    Science.gov (United States)

    Onders, Raymond P; Carlin, Arthur M; Elmo, MaryJo; Sivashankaran, Subhalakashmi; Katirji, Bashar; Schilz, Robert

    2009-03-01

    There is a paucity of literature concerning general anesthesia and surgery in patients with amyotrophic lateral sclerosis (ALS or Lou Gehrig's disease). This report summarizes the largest series of surgical cases in ALS during multicenter prospective trials of the laparoscopic diaphragm pacing system (DPS) to delay respiratory failure. The overall strategy outlined includes the use of rapidly reversible short-acting analgesic and amnestic agents with no neuromuscular relaxants. Fifty-one patients were implanted from March 2005 to March 2008 at 2 sites. Age at implantation ranged from 42 to 73 years and the percent predicted forced vital capacity (FVC) ranged from 20% to 87%. On preoperative blood gases, Pco(2) was as high as 60. Using this protocol, there were no failures to extubate or 30-day mortalities. The DPS system increases the respiratory system compliance by decreasing posterior lobe atelectasis and can stimulate respirations at the end of each case. Laparoscopic surgery with general anesthesia can be safely performed in patients with ALS undergoing DPS.

  3. Open-ended guidewire for percutaneous therapy of varicocele

    International Nuclear Information System (INIS)

    Benea, G.; Galeotti, R.; Tartari, S.; Mannella, P.

    1989-01-01

    Percutaneous transvenous treatment has become the elective therapy for varicocele because it is a simple, safe, economic and reliable procedure. The presence of proximal anastomoses connecting a competent valved spermatic trunk with the renal vein can be responsible for a varicocele and make its treatment difficult. In such cases, the valve of the spermatic venous trunk can be bypassed using an open-ended guidewire with a removable mandril core, and then injecting the sclerosing agent through the guide. Moreover, the guidewire can facilitate the insertion of catheter through the competent valve, thus allowing the placement of Gianturco coils. During the past 12 months the authors have successfully treated 4 patients affected by varicocele with competent valved venous trunk using the open-ended guidewire

  4. Replacement of the instrumentation and control system of Tore Supra

    International Nuclear Information System (INIS)

    Leveque, P.

    1995-02-01

    The control system of the Tore-Supra is a wide and complex system that cannot be interrupted while running without significant consequences on the operating of the machine. Replacing the current system cannot be achieved in a global way without immobilisation and high costs. Therefore partial changes have been decided on. This work presents the detailed analysis of the arrangements and the operating of the system that will be replaced: the pro's and con's that have appeared through experience are related. The possibilities that the new apparatus offers are also examined. A method of step by step replacements had to be set up in order to assess the means, funds, term of achievement, performance and quality of the overall project. (TEC). 15 refs., 29 figs

  5. Neutron beam facilities at the Australian Replacement Research Reactor

    International Nuclear Information System (INIS)

    Kennedy, Shane; Robinson, Robert; Hunter, Brett

    2001-01-01

    Australia is building a research reactor to replace the HIFAR reactor at Lucas Heights by the end of 2005. Like HIFAR, the Replacement Research Reactor will be multipurpose with capabilities for both neutron beam research and radioisotope production. It will be a pool-type reactor with thermal neutron flux (unperturbed) of 4 x 10 14 n/cm 2 /sec and a liquid D 2 cold neutron source. Cold and thermal neutron beams for neutron beam research will be provided at the reactor face and in a large neutron guide hall. Supermirror neutron guides will transport cold and thermal neutrons to the guide hall. The reactor and the associated infrastructure, with the exception of the neutron beam instruments, is to be built by INVAP S.E. under contract. The neutron beam instruments will be developed by ANSTO, in consultation with the Australian user community. This status report includes a review the planned scientific capabilities, a description of the facility and a summary of progress to date. (author)

  6. End-Effector Position Analysis Using Forward Kinematics For 5 Dof Pravak Robot Arm

    Directory of Open Access Journals (Sweden)

    Jolly Atit Shah

    2013-03-01

    Full Text Available Automatic control of the robotic manipulator involves study of kinematics and dynamics as a major issue. This paper involves the kinematic analysis of a Pravak Robot arm which is used for doing successful robotic manipulation task in its workspace. The Pravak Robot Arm is a 5-DOF robot having all the joints revolute. The kinematics problem is defined as the transformation from the Cartesian space to the joint space and vice versa. In this study the Denavit- Hartenberg (D-H model is used to model robot links and joints. Pravak Robot Arm is a simple and safe robotic system designed for laboratory training and research applications. This robot allows to gain theoretical and practical experience in robotics, automation and control systems. The MATLAB R2007 is used to analyse end effectors position for a set of joint parameter.

  7. VegeSafe: A community science program measuring soil-metal contamination, evaluating risk and providing advice for safe gardening.

    Science.gov (United States)

    Rouillon, Marek; Harvey, Paul J; Kristensen, Louise J; George, Steven G; Taylor, Mark P

    2017-03-01

    The extent of metal contamination in Sydney residential garden soils was evaluated using data collected during a three-year Macquarie University community science program called VegeSafe. Despite knowledge of industrial and urban contamination amongst scientists, the general public remains under-informed about the potential risks of exposure from legacy contaminants in their home garden environment. The community was offered free soil metal screening, allowing access to soil samples for research purposes. Participants followed specific soil sampling instructions and posted samples to the University for analysis with a field portable X-ray Fluorescence (pXRF) spectrometer. Over the three-year study period, >5200 soil samples, primarily from vegetable gardens, were collected from >1200 Australian homes. As anticipated, the primary soil metal of concern was lead; mean concentrations were 413 mg/kg (front yard), 707 mg/kg (drip line), 226 mg/kg (back yard) and 301 mg/kg (vegetable garden). The Australian soil lead guideline of 300 mg/kg for residential gardens was exceeded at 40% of Sydney homes, while concentrations >1000 mg/kg were identified at 15% of homes. The incidence of highest soil lead contamination was greatest in the inner city area with concentrations declining towards background values of 20-30 mg/kg at 30-40 km distance from the city. Community engagement with VegeSafe participants has resulted in useful outcomes: dissemination of knowledge related to contamination legacies and health risks; owners building raised beds containing uncontaminated soil and in numerous cases, owners replacing all of their contaminated soil. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. REPLACEMENT SPARE PART INVENTORY MONITORING USING ADAPTIVE NEURO FUZZY INFERENCE SYSTEM

    Directory of Open Access Journals (Sweden)

    Hartono Hartono

    2016-01-01

    Full Text Available Abstract   The amount of inventory is determined on the basis of the demand. So that users can know the demand forecasts need to be done on the request. This study uses the data to implement a replacement parts on the electronic module production equipment in the telecommunications transmission systems, switching, access and power, ie by replacing the electronic module in the system is trouble  or damaged parts of a good electronic module spare parts inventory, while the faulty electronic modules shipped to the Repair Center for repaired again, so that the results of these improvements can replenish spare part  inventory. Parameters speed on improvement process of electronic module broken (repaired, in the form of an average repair time at the repair centers, in order to get back into the electronic module that is ready for used as spare parts in compliance with the safe supply inventory  warehouse.  This research using the method  of  Adaptive Neuro Fuzzy Inference System (ANFIS in developing a decision support system for inventory control of spare parts available in Warehouse Inventory taking into account several parameters supporters, namely demand, improvement and fulfillment of spare parts and repair time. This study uses a recycling input parameter repair faulty electronic module of the customer to immediately replace the module in inventory warehouse,  do improvements in the Repair Center. So the acceleration restoration factor is very influential as the input spare parts inventory supply in the warehouse and using the Adaptive Neuro-Fuzzy Inference System (ANFIS method.   Keywords: ANFIS, inventory control, replacement

  9. Steam generator replacement at Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Kimura, S.; Dodo, Takashi; Negishi, Kazuo

    1995-01-01

    Eleven nuclear units are in operation at the Kansai Electric Power Co., Inc.. In seven of them, Mihama-1·2·3, Takahama-1·2, and Ohi-1·2, comparatively long duration for tube inspection and repair have been required during late annual outages. KEPCO decided to replace all steam generators in these 7 units with the latest model which was improved upon the past degradation experiences, as a result of comprehensive considerations including public confidence in nuclear power generation, maintenability, and economic efficiency. This report presents the design improvements in new steam generators, replacement techniques, and so on. (author)

  10. Matched cohort study of topical tranexamic acid in cementless primary total hip replacement.

    Science.gov (United States)

    Sanz-Reig, Javier; Mas Martinez, Jesus; Verdu Román, Carmen; Morales Santias, Manuel; Martínez Gimenez, Enrique; Bustamante Suarez de Puga, David

    2018-03-29

    Tranexamic acid has been shown to be effective in reducing blood loss after total hip replacement. The purpose of this study was to prospectively assess the effectiveness of topical TXA use to reduce blood loss after primary total hip replacement and to compare these outcomes with those of a matched control group from a similar cohort that did not have received tranexamic acid. This is a prospective matched control study to assess the effect of a 2 g topical tranexamic acid in 50 mL physiological saline solution in total hip replacement. Primary outcomes were hemoglobin and hematocrit drop, and total blood loss. Secondary outcomes were transfusion rates, length of hospital stay, deep vein thrombosis, and pulmonary embolism events. We could match 100 patients to a control group. There were no statistical significantly differences between the two groups. The hemoglobin and hematocrit postoperative values were significantly higher in topical tranexamic acid group than in control group (P tranexamic acid group and 1163 in control group with significant differences (P = 0.001), which meant 34% reduction in total blood loss. Length of stay was lower in topical tranexamic acid group. The risk of deep vein thrombosis and pulmonary events did not increase. A single dose of 2 g tranexamic acid in 50 mL physiological saline solution topical administration was effective and safe in reducing bleeding in patients undergoing unilateral primary non-cemented total hip replacement compared to a matched control group.

  11. Safe new reactor for radionuclide production

    International Nuclear Information System (INIS)

    Gray, P.L.

    1995-01-01

    In late 1995, DOE is schedule to announce a new tritium production unit. Near the end of the last NPR (New Production Reactors) program, work was directed towards eliminating risks in current designs and reducing effects of accidents. In the Heavy Water Reactor Program at Savannah River, the coolant was changed from heavy to light water. An alternative, passively safe concept uses a heavy-water-filled, zircaloy reactor calandria near the bottom of a swimming pool; the calandria is supported on a light-water-coolant inlet plenum and has upflow through assemblies in the calandria tubes. The reactor concept eliminates or reduces significantly most design basis and severe accidents that plague other deigns. The proven, current SRS tritium cycle remains intact; production within the US of medical isotopes such as Mo-99 would also be possible

  12. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  13. Safe Grid

    Science.gov (United States)

    Chow, Edward T.; Stewart, Helen; Korsmeyer, David (Technical Monitor)

    2003-01-01

    The biggest users of GRID technologies came from the science and technology communities. These consist of government, industry and academia (national and international). The NASA GRID is moving into a higher technology readiness level (TRL) today; and as a joint effort among these leaders within government, academia, and industry, the NASA GRID plans to extend availability to enable scientists and engineers across these geographical boundaries collaborate to solve important problems facing the world in the 21 st century. In order to enable NASA programs and missions to use IPG resources for program and mission design, the IPG capabilities needs to be accessible from inside the NASA center networks. However, because different NASA centers maintain different security domains, the GRID penetration across different firewalls is a concern for center security people. This is the reason why some IPG resources are been separated from the NASA center network. Also, because of the center network security and ITAR concerns, the NASA IPG resource owner may not have full control over who can access remotely from outside the NASA center. In order to obtain organizational approval for secured remote access, the IPG infrastructure needs to be adapted to work with the NASA business process. Improvements need to be made before the IPG can be used for NASA program and mission development. The Secured Advanced Federated Environment (SAFE) technology is designed to provide federated security across NASA center and NASA partner's security domains. Instead of one giant center firewall which can be difficult to modify for different GRID applications, the SAFE "micro security domain" provide large number of professionally managed "micro firewalls" that can allow NASA centers to accept remote IPG access without the worry of damaging other center resources. The SAFE policy-driven capability-based federated security mechanism can enable joint organizational and resource owner approved remote

  14. Membrane Lipid Replacement for chronic illnesses, aging and cancer using oral glycerolphospholipid formulations with fructooligosaccharides to restore phospholipid function in cellular membranes, organelles, cells and tissues.

    Science.gov (United States)

    Nicolson, Garth L; Ash, Michael E

    2017-09-01

    Membrane Lipid Replacement is the use of functional, oral supplements containing mixtures of cell membrane glycerolphospholipids, plus fructooligosaccharides (for protection against oxidative, bile acid and enzymatic damage) and antioxidants, in order to safely replace damaged, oxidized, membrane phospholipids and restore membrane, organelle, cellular and organ function. Defects in cellular and intracellular membranes are characteristic of all chronic medical conditions, including cancer, and normal processes, such as aging. Once the replacement glycerolphospholipids have been ingested, dispersed, complexed and transported, while being protected by fructooligosaccharides and several natural mechanisms, they can be inserted into cell membranes, lipoproteins, lipid globules, lipid droplets, liposomes and other carriers. They are conveyed by the lymphatics and blood circulation to cellular sites where they are endocytosed or incorporated into or transported by cell membranes. Inside cells the glycerolphospholipids can be transferred to various intracellular membranes by lipid globules, liposomes, membrane-membrane contact or by lipid carrier transfer. Eventually they arrive at their membrane destinations due to 'bulk flow' principles, and there they can stimulate the natural removal and replacement of damaged membrane lipids while undergoing further enzymatic alterations. Clinical trials have shown the benefits of Membrane Lipid Replacement in restoring mitochondrial function and reducing fatigue in aged subjects and chronically ill patients. Recently Membrane Lipid Replacement has been used to reduce pain and other symptoms as well as removing hydrophobic chemical contaminants, suggesting that there are additional new uses for this safe, natural medicine supplement. This article is part of a Special Issue entitled: Membrane Lipid Therapy: Drugs Targeting Biomembranes edited by Pablo V. Escribá. Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights

  15. The role of the safety analysis organization in steam generators replacement and reactor vessel head replacement evaluations

    International Nuclear Information System (INIS)

    Choe, Whee G.; Boatwright, W.J.

    2004-01-01

    When a major component in a nuclear power plant is replaced, especially the steam generators, the plant operator is presented a rare opportunity to learn from operating experience and significantly improve the performance, reliability and robustness of the plant. In addition to the use of improved materials, improved design margins can be built into the component specification that can later be used to provide meaningful operating margins. A Safety Analysis organization that is well-integrated with other plant organizations and possesses a detailed knowledge of the plant design and licensing bases can effectively balance the wants and needs of each organization to optimize the benefits realized by the plant as a whole. Knowledge of the assumptions, limitations, and available margins, both analytical and operating, can be used to specify a replacement steam generator design that optimizes costs and operating improvements. The work scope required to support the new design can be controlled through carefully selected and evaluated restrictions in operations, development of alternate operating strategies, and imposition of appropriate limitations. The important point is that the effective Safety Analysis organization must possess both the breadth and depth of knowledge of the plant design and operations and proactively use this information to support the replacement steam generator project. (author)

  16. Influence of suture technique and suture material selection on the mechanics of end-to-end and end-to-side anastomoses.

    Science.gov (United States)

    Baumgartner, N; Dobrin, P B; Morasch, M; Dong, Q S; Mrkvicka, R

    1996-05-01

    Experiments were performed in dogs to evaluate the mechanics of 26 end-to-end and 42 end-to-side artery-vein graft anastomoses constructed with continuous polypropylene sutures (Surgilene; Davis & Geck, Division of American Cyanamid Co., Danbury, Conn.), continuous polybutester sutures (Novafil; Davis & Geck), and interrupted stitches with either suture material. After construction, the grafts and adjoining arteries were excised, mounted in vitro at in situ length, filled with a dilute barium sulfate suspension, and pressurized in 25 mm Hg steps up to 200 mm Hg. Radiographs were obtained at each pressure. The computed cross-sectional areas of the anastomoses were compared with those of the native arteries at corresponding pressures. Results showed that for the end-to-end anastomoses at 100 mm Hg the cross-sectional areas of the continuous Surgilene anastomoses were 70% of the native artery cross-sectional areas, the cross-sectional areas of the continuous Novafil anastomoses were 90% of the native artery cross-sectional areas, and the cross-sectional areas of the interrupted anastomoses were 107% of the native artery cross-sectional areas (p anastomoses demonstrated no differences in cross-sectional areas or compliance for the three suture techniques. This suggests that, unlike with end-to-end anastomoses, when constructing an end-to-side anastomosis in patients any of the three suture techniques may be acceptable.

  17. Limited versus full sternotomy for aortic valve replacement.

    Science.gov (United States)

    Kirmani, Bilal H; Jones, Sion G; Malaisrie, S C; Chung, Darryl A; Williams, Richard Jnn

    2017-04-10

    Aortic valve disease is a common condition that is easily treatable with cardiac surgery. This is conventionally performed by opening the sternum longitudinally down the centre ("median sternotomy") and replacing the valve under cardiopulmonary bypass. Median sternotomy is generally well tolerated, but as less invasive options have become available, the efficacy of limited incisions has been called into question. In particular, the effects of reducing the visibility and surgical access has raised safety concerns with regards to the placement of cannulae, venting of the heart, epicardial wire placement, and de-airing of the heart at the end of the procedure. These difficulties may increase operating times, affecting outcome. The benefits of smaller incisions are thought to include decreased pain; improved respiratory mechanics; reductions in wound infections, bleeding, and need for transfusion; shorter intensive care stay; better cosmesis; and a quicker return to normal activity. To assess the effects of minimally invasive aortic valve replacement via a limited sternotomy versus conventional aortic valve replacement via median sternotomy in people with aortic valve disease requiring surgical replacement. We performed searches of CENTRAL, MEDLINE, Embase, clinical trials registries, and manufacturers' websites from inception to July 2016, with no language limitations. We reviewed references of identified papers to identify any further studies of relevance. Randomised controlled trials comparing aortic valve replacement via a median sternotomy versus aortic valve replacement via a limited sternotomy. We excluded trials that performed other minimally invasive incisions such as mini-thoracotomies, port access, trans-apical, trans-femoral or robotic procedures. Although some well-conducted prospective and retrospective case-control and cohort studies exist, these were not included in this review. Two review authors independently assessed trial papers to extract data

  18. Changing of the guard: reducing infection when replacing neural pacemakers.

    Science.gov (United States)

    Pepper, Joshua; Meliak, Lara; Akram, Harith; Hyam, Jonathan; Milabo, Catherine; Candelario, Joseph; Foltynie, Thomas; Limousin, Patricia; Curtis, Carmel; Hariz, Marwan; Zrinzo, Ludvic

    2017-04-01

    OBJECTIVE Infection of deep brain stimulation (DBS) hardware has a significant impact on patient morbidity. Previous experience suggests that infection rates appear to be higher after implantable pulse generator (IPG) replacement surgery than after the de novo DBS procedure. In this study the authors examine the effect of a change in practice during DBS IPG replacements at their institution. METHODS Starting in January 2012, patient screening for methicillin-resistant Staphylococcus aureus (MRSA) and, and where necessary, eradication was performed prior to elective DBS IPG change. Moreover, topical vancomycin was placed in the IPG pocket during surgery. The authors then prospectively examined the infection rate in patients undergoing DBS IPG replacement at their center over a 3-year period with at least 9 months of follow-up. RESULTS The total incidence of infection in this prospective consecutive series of 101 IPG replacement procedures was 0%, with a mean follow-up duration of 24 ± 11 months. This was significantly lower than the authors' previously published historical control group, prior to implementing the change in practice, where the infection rate for IPG replacement was 8.5% (8/94 procedures; p = 0.003). CONCLUSIONS This study suggests that a change in clinical practice can significantly lower infection rates in patients undergoing DBS IPG replacement. These simple measures can minimize unnecessary surgery, loss of benefit from chronic stimulation, and costly hardware replacement, further improving the cost efficacy of DBS therapies.

  19. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  20. Meal replacements as a weight loss tool in a population with severe mental illness.

    Science.gov (United States)

    Gelberg, Hollie A; Kwan, Crystal L; Mena, Shirley J; Erickson, Zachary D; Baker, Matthew R; Chamberlin, Valery; Nguyen, Charles; Rosen, Jennifer A; Shah, Chandresh; Ames, Donna

    2015-12-01

    Weight gain and worsening metabolic parameters are often side effects of antipsychotic medications used by individuals with severe mental illness. To address this, a randomized, controlled research study of a behavioral weight management program for individuals with severe mental illness was undertaken to assess its efficacy. Patients unable to meet weight loss goals during the first portion of the year-long study were given the option of using meal replacement shakes in an effort to assist with weight loss. Specific requirements for use of meal replacement shakes were specified in the study protocol; only five patients were able to use the shakes in accordance with the protocol and lose weight while improving metabolic parameters. Case studies of two subjects are presented, illustrating the challenges and obstacles they faced, as well as their successes. Taking responsibility for their own weight loss, remaining motivated through the end of the study, and incorporating the meal replacement shakes into a daily routine were factors found in common with these patients. Use of meal replacements shakes with this population may be effective. Published by Elsevier Ltd.

  1. Experiments of progressive replacement in Cesar at operation temperature. Uranium-plutonium fuels. Study performed within the frame of the CEA-EURATOM - No. 002 64 9 TRUF contract - 'Plutonium recycling'

    International Nuclear Information System (INIS)

    Bosser, Roland; Cuny, Gerard; Hoffmann, Alain; Langlet, Gerard; Laponche, Bernard; Morier, Francis; Penet, Francois; Charbonneau, Serge

    1969-08-01

    Experiments of progressive replacement (or substitution) of uranium-plutonium alloy fuels are part of a general program of experimental studies which are aimed at testing the methods used by the CEA to calculate the evolution of nuclear power reactors (calculation of spectrum in plutonium-containing fuels and validity of data used in these calculations, calculation of cross sections). Such progressive replacements have been performed in Aquilon (with heavy water as moderator) and measurements have been performed by oscillation in Marius and Cesar (graphite moderator). Herein reported experiments have been performed at 20, 100 and 200 C during a first campaign in 1966, and at 300, 400 and 450 C during a second campaign in 1968. Measurements are interpreted by means of the Coregraf 2 code. The report presents experimental conditions in Cesar, the measurement principle and the interpretation method (substitution experiments, enriched uranium calibration, interpretation steps, and temperature coefficient measurement), the obtained results and their discussion [fr

  2. Jejunal Replacement of Stomach in Two Children with Total Gastric Necrosis

    Directory of Open Access Journals (Sweden)

    Onder Ozden

    2014-04-01

    Full Text Available Total gastrectomy is an extremely rare procedure in children and experience with its replacement is very limited. We present two patients who had jejunal replacement due to total gastric necrosis. The first patient was a- 2-year-old boy who admitted with a history of caustic ingestion. He was taken operation because of gastric perforation and necrosis. Anastomosis was applied by using jejunal segments. The second patient was an 11-years-old girl who left diaphragmatic hernia and acute gastric volvulus. At laparotomy, Total gastrectomy and Hunt-Lawrence type gastroesophostomy were made. Reconstruction with jejunum is thought as a good option in total gastric necrosis according to our 2 patient experiences. [Cukurova Med J 2014; 39(2.000: 403-407

  3. Safety Case for Safe-store

    International Nuclear Information System (INIS)

    Woollam, Paul B.

    2002-01-01

    Magnox Electric plc (Magnox), a wholly owned subsidiary of BNFL, owns 26 gas-cooled, graphite-moderated units on 11 sites in the UK. Eight units have been permanently shutdown and the remainder will shut this decade in a currently declared closure programme. The first of these reactors went to power in 1952 and the fleet has generated typically 9% of the UK's electricity during the last five decades. In accordance with UK Government policy, BNFL aims for a systematic and progressive reduction in hazards on its decommissioning sites. The end-point of the decommissioning process is that the reactors will be dismantled and their sites de-licensed. This will be done through minimising both the risks to the public, workers and the environment and also the lifetime cost, consistent with world class safety. There will be passive safe storage during deferment periods and it is BNFL's clear intent that the reactors will not be Safe-stored indefinitely. The main hazard associated with any decommissioned nuclear site is the spent fuel. Hence the reactors will be de-fuelled as soon as practicable after shutdown. After this work is complete, Cs-137 contaminated plant (e.g. fuel pools, effluent plant, and drains) will be dismantled when it is no longer needed. All other plant and buildings will also be dismantled when they are no longer needed, except for the reactor buildings which will be put into passive safe storage. Co-60 contaminated plant, such as steam generators, will be dismantled with the reactors. The reactors will be dismantled in a sequenced programme, with a notional start time around 100 years from shutdown. Magnox Electric is ensuring that the reactors and primary circuits on all its sites are well characterised. We have carried out a detailed, peer reviewed hazard identification on the lead site from which we have generated a rolling 25-year basic safety case. We have then searched for cliff edge effects and possible long-term changes to generate the 100-year

  4. Challenge of Replacing Obsolete Equipment and Systems on Brownfield Sites

    International Nuclear Information System (INIS)

    Teasdale, St.

    2009-01-01

    The Nuclear Decommissioning Authority (NDA) is responsible for the decommissioning and clean-up of the UK's civil public sector nuclear sites. One of their top priorities is the retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP) at Sellafield site which is one of the most complex and compact nuclear sites in the world. The FGMSP plant is currently undergoing a series of major modifications in preparation for the retrievals operations. One of the most challenging modifications undertaken in the facility has been the Control and Surveillance Project which covered replacement of the existing Environmental Monitoring System, this presented the complex challenge of replacing an existing system whilst maintaining full functionality on a live radiological safety system with a constant radiological hazard. The Control and Surveillance Project involved the design, procurement, installation, changeover and commissioning of a new Radiological Surveillance System (alpha, beta and gamma monitoring) along with Building Evacuation Systems within the FGMSP complex to replace the existing obsolete system. This Project was a key enabler to future FGMSP retrievals and decommissioning activities. The project objective was to create and maintain a safe radiological working environment for over 450 personnel working in the plant up to 2020. The Legacy Ponds at Sellafield represent one of the biggest challenges in the civil nuclear clean up portfolio in the UK. Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP), and its safe long term storage is one of the NDA's top priorities. In June 2002 Sellafield Ltd contracted with the ACKtiv Nuclear Joint Venture to progress the risk mitigation, asset restoration and the early enabling works associated with preparation for clean up. Since then significant progress has been made in preparing the facility, and it's support systems, for the clean-up operations. This has been

  5. 836: Developing a Cooperative Communication System for Safe, Effective, and Efficient Patient Care

    Science.gov (United States)

    2014-01-01

    cally ill patients (pts) for hemodynamic monitoring using novel VPS’s can be performed efficiently and safely. Methods: In an adult academic medical...for hemodynamic monitoring was selected. Open ended PICCs were inserted using a novel Dop- pler and intravascular EKG positioning system and CXR was...unclear responsibility for task comple- tion; time spent tracking down in-process items like meds and labs; reliance on nurses to track and fix

  6. Safe semi-supervised learning based on weighted likelihood.

    Science.gov (United States)

    Kawakita, Masanori; Takeuchi, Jun'ichi

    2014-05-01

    We are interested in developing a safe semi-supervised learning that works in any situation. Semi-supervised learning postulates that n(') unlabeled data are available in addition to n labeled data. However, almost all of the previous semi-supervised methods require additional assumptions (not only unlabeled data) to make improvements on supervised learning. If such assumptions are not met, then the methods possibly perform worse than supervised learning. Sokolovska, Cappé, and Yvon (2008) proposed a semi-supervised method based on a weighted likelihood approach. They proved that this method asymptotically never performs worse than supervised learning (i.e., it is safe) without any assumption. Their method is attractive because it is easy to implement and is potentially general. Moreover, it is deeply related to a certain statistical paradox. However, the method of Sokolovska et al. (2008) assumes a very limited situation, i.e., classification, discrete covariates, n(')→∞ and a maximum likelihood estimator. In this paper, we extend their method by modifying the weight. We prove that our proposal is safe in a significantly wide range of situations as long as n≤n('). Further, we give a geometrical interpretation of the proof of safety through the relationship with the above-mentioned statistical paradox. Finally, we show that the above proposal is asymptotically safe even when n(')experiments illustrate the performance of these methods. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The DOE-Idaho Operations Office (DOE-ID) has prepared an environmental assessment (EA) on the replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory at the Idaho National Engineering Laboratory (INEL). The purpose of this project is to replace the existing Health Physics Instrumentation Laboratory (HPIL) with a new facility to provide a safe environment for maintaining and calibrating radiation detection instruments used at the Idaho National Engineering Laboratory. The existing HPIL facility provides portable health physics monitoring instrumentation and direct reading dosimetry procurement, maintenance and calibration of radiation detection instruments, and research and development support-services to the INEL and others. However, the existing facility was not originally designed for laboratory activities and does not provide an adequate, safe environment for calibration activities. The EA examined the potential environmental impacts of the proposed action and evaluated reasonable alternatives, including the no action alternative in accordance with the Council on Environmental Quality (CEQ) Regulations (40 CFR Parts 1500-1508). Based on the environmental analysis in the attached EA, the proposed action will not have a significant effect on the human environment within the meaning of the National Environmental Policy Act (NEPA) and 40 CFR Parts 1508.18 and 1508.27. The selected action (the proposed alternative) is composed of the following elements, each described or evaluated in the attached EA on the pages referenced. The proposed action is expected to begin in 1997 and will be completed within three years: design and construction of a new facility at the Central Facility Area of the INEL; operation of the facility, including instrument receipt, inspections and repairs, precision testing and calibration, and storage and issuance. The selected action will result in no significant environmental impacts

  8. Physicians' experiences with end-of-life decision-making: Survey in 6 European countries and Australia

    Directory of Open Access Journals (Sweden)

    Mortier Freddy

    2008-02-01

    Full Text Available Abstract Background In this study we investigated (a to what extent physicians have experience with performing a range of end-of-life decisions (ELDs, (b if they have no experience with performing an ELD, would they be willing to do so under certain conditions and (c which background characteristics are associated with having experience with/or being willing to make such ELDs. Methods An anonymous questionnaire was sent to 16,486 physicians from specialities in which death is common: Australia, Belgium, Denmark, Italy, the Netherlands, Sweden and Switzerland. Results The response rate differed between countries (39–68%. The experience of foregoing life-sustaining treatment ranged between 37% and 86%: intensifying the alleviation of pain or other symptoms while taking into account possible hastening of death between 57% and 95%, and experience with deep sedation until death between 12% and 46%. Receiving a request for hastening death differed between 34% and 71%, and intentionally hastening death on the explicit request of a patient between 1% and 56%. Conclusion There are differences between countries in experiences with ELDs, in willingness to perform ELDs and in receiving requests for euthanasia or physician-assisted suicide. Foregoing treatment and intensifying alleviation of pain and symptoms are practiced and accepted by most physicians in all countries. Physicians with training in palliative care are more inclined to perform ELDs, as are those who attend to higher numbers of terminal patients. Thus, this seems not to be only a matter of opportunity, but also a matter of attitude.

  9. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  10. Nuclear Energy: A Competitive and Safe Option, The EDF Experience

    International Nuclear Information System (INIS)

    Colas, F.

    1998-01-01

    Today, nuclear energy seems challenged by fossil energies, especially gas. However, the 1997's French government survey over energy options still places nuclear energy at the top of the list. The reasons why and how safe nuclear energy is still competitive are detailed in this paper. Most recent data from EDF's reactor will be discussed in terms of environmental and electricity production issues. The methods and management used to attain these results are explained for the different phases: design, construction, operation, and maintenance. The beneficial aspects over industrial development and local employment will be underlined. The influence of nuclear energy on EDF's financial results are shown, from past programme to today's operation. As most of french reactors are designed to adapt their output to the changes of load in the national grid, results are, as a conclusion, discussed in a small and medium electrical grid perspective. (author)

  11. Thematic and athematic present endings in Balto-Slavic and Indo-European

    Directory of Open Access Journals (Sweden)

    Frederik Kortlandt

    2015-09-01

    Full Text Available While the original primary thematic endings were preserved quite well in Balto-Slavic, they were often replaced by the corresponding athematic endings following the thematic vowel *‑e/o‑ in the other Indo-European languages, thus bringing them into line with the secondary endings. Without taking the semantics of the thematic flexion into consideration, Warren Cowgill has forcefully defended the traditional view that apart from the 1st sg. ending *‑ō, the thematic endings were identical with the athematic endings preceded by the thematic vowel *‑e/o‑ in Proto-Indo-European. The main point to be taken into consideration is that the rich and heterogeneous material of Balto-Slavic allows a reconstruction which is on the same level as that of Indo-Iranian and Greek. It confirms the view that our reconstructions have a bias toward the languages on which they are primarily based (Cowgill’s “trusty trio Hittite, Sanskrit, Greek”. The history of linguistic reconstruction shows a gradual shift away from the principal languages.

  12. Delayed primary end-to-end anastomosis for traumatic long segment urethral stricture and its short-term outcomes

    Directory of Open Access Journals (Sweden)

    Rajarshi Kumar

    2017-01-01

    Full Text Available Background: The purpose of this study is to evaluate the aetiology of posterior urethral stricture in children and analysis of results after delayed primary repair with extensive distal urethral mobilisation. Materials and Methods: This was a retrospective study carried out in a tertiary care centre from January 2009 to December 2013. Results: Eight children with median age 7.5 years (range 4–11 years, underwent delayed anastomotic urethroplasty: Six through perineal and two through combined perineal and transpubic approach. All the eight children had long-segment >2 cm stricture: Three posterior and five anterior urethral stricture. On a mean follow-up period of 33 months (range 24–48 m, all were passing urine with good flow and stream. Conclusion: End-to-end anastomosis in post-traumatic long segment posterior urethral stricture between prostatic and penile urethra in children is possible by perineal or combined perineal and transpubic approach with good results without any urethral replacement.

  13. First Demonstration of Real-Time End-to-End 40 Gb/s PAM-4 System using 10-G Transmitter for Next Generation Access Applications

    DEFF Research Database (Denmark)

    Wei, Jinlong; Eiselt, Nicklas; Griesser, Helmut

    We demonstrate the first known experiment of a real-time end-to-end 40-Gb/s PAM-4 system for next generation access applications using 10G class transmitters only. Up to 25-dB upstream link budget for 20 km SMF is achieved.......We demonstrate the first known experiment of a real-time end-to-end 40-Gb/s PAM-4 system for next generation access applications using 10G class transmitters only. Up to 25-dB upstream link budget for 20 km SMF is achieved....

  14. From vulnerability to passion in the end-of-life care: The lived experience of nurses.

    Science.gov (United States)

    Liu, Ying-Chun; Chiang, Hsien-Hsien

    2017-12-01

    End-of-life (EOL) care is considered to be inherently difficult and vulnerable for patients and nurses. It also seems hard to develop passion for care during these problematic times. This study elucidates how EOL nurses interpret their care experience and how they transform their experience and mindset. This study was conducted by organizing a reflective group based on the concept of group analysis for oncology and hospice nurses to share their experience. Thirteen registered nurses were enrolled from a medical center in northern Taiwan. Data drawn from the group dialogue was derived from six digitally recorded sessions and then analysed alone with the researcher's diaries and participants' feedback sheets. Interpretative Phenomenological Analysis (IPA) was used to analyze the data. The results showed that nurses who provide EOL care actually experience suffering by witnessing patients' suffering. However, the suffering authentically drives the nurses to encounter their own inner selves, to induce the shift of mindset, and then allow them to continuously provide and maintain the passion in EOL care. This study provides a new viewpoint for understanding of EOL nurses' experiences, indicating that this line of work may be recognized as a privilege. We recommend that the setting of a nurse reflective group is important and it may be considered in providing EOL care training for nurses. Hopefully the study results could shed lights for future policies regarding EOL care. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Pacemaker replacement in nonagenarians: Procedural safety and long-term follow-up.

    Science.gov (United States)

    Loirat, Aurélie; Fénéon, Damien; Behaghel, Albin; Behar, Nathalie; Le Helloco, Alain; Mabo, Philippe; Daubert, Jean-Claude; Leclercq, Christophe; Martins, Raphaël P

    2015-01-01

    The rate of pacemaker implantation is rising. Given that the life expectancy of the population is projected to increase, a large number of elderly patients are likely to be implanted in the future. As pacemaker batteries can last for 8-10years, an increasing number of pacemaker recipients will require replacement of their devices when they become nonagenarians. To analyse the short- and long-term outcomes after device replacement in nonagenarians. Patients aged≥90years referred to a tertiary centre for pacemaker replacement from January 2004 to July 2014 were included retrospectively. Clinical follow-up data were obtained from clinical visits or telephone interviews with patients or their families. The primary clinical endpoint was total mortality. Secondary endpoints included early and delayed procedure-related complications and predictive risk factors for total mortality. Sixty-two patients were included (mean age 93.3±2.9years at time of pacemaker replacement). Mean procedure duration was 35.7±17.2minutes. Mean hospital stay was 2.2±1.1days. One patient died from a perioperative complication. Thirty-seven patients (59.7%) died during a median follow-up of 22.1months (interquartile range, 11.8-39.8months). Survival rates were 84.2% (95% confidence interval [CI] 71.8-91.5%) at 1year, 66.9% (95% CI 51.8-78.2%) at 2years and 22.7% (95% CI 10.6-37.7%) at 5years. Atrial fibrillation (hazard ratio 2.47, 95% CI 1.1-5.6) and non-physiological pacing (i.e. VVI pacing in patients in sinus rhythm) (hazard ratio 2.20, 95% CI 1.0-4.9) were predictors of mortality. Pacemaker replacement in nonagenarians is a safe and straightforward procedure. These data suggest that procedures can be performed securely in this old and frail population, with patients living for a median of 30months afterwards. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  16. A painful, never ending story: older women's experiences of living with an osteoporotic vertebral compression fracture.

    Science.gov (United States)

    Svensson, H K; Olofsson, E H; Karlsson, J; Hansson, T; Olsson, L-E

    2016-05-01

    Vertebral compression fractures (VCF) cause pain and decreased physical ability, with no known well-established treatment. The aim of this study was to illuminate the experience of living with a VCF. The results show that fear and concerns are a major part of daily life. The women's initial contact with health-care providers should focus on making them feel acknowledged by offering person-centered and tailored support. In the past decade, osteoporotic-related fractures have become an increasingly common and costly public health problem worldwide. Vertebral compression fracture (VCF) is the second most common osteoporotic fracture, and patients with VCF describe an abrupt descent into disability, with a subsequent desire to regain independence in everyday life; however, little is known of their situation. The aim of this study was to illuminate the lived experience of women with an osteoporotic VCF. Ten women were interviewed during 2012-2013, starting with an open-ended question: could you tell me what it is like to live with a vertebral compression fracture? The verbatim transcribed interviews were analyzed using a phenomenological hermeneutical approach. The narrative provided descriptions of living in turmoil and chaos, unable to find stability in their life with little improvement regarding pain and physical function. Shifts from periods of constant pain to periods of fear of constant pain created a loss of confidence and an increased sense of confinement. The structural analysis revealed fear and concerns as the most prominent experience building on five themes: struggling to understand a deceiving body, breakthrough pain fueling fear, fearing a trajectory into isolation, concerns of dependency, and fearing an uncertain future. Until researchers find a successful prevention or medical/surgical treatment for osteoporotic VCFs, health-care providers and society abandon these women to remain in a painful and never ending story.

  17. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  18. Development of a research simulator for the study of human factors and experiments

    International Nuclear Information System (INIS)

    Kawano, R.; Shibuya, S.

    1999-01-01

    A research simulator of nuclear power plant for Human Factors was developed. It simulates the behaviors of the 1100MWe BWR nuclear power plant and has almost same functions ant scope of the simulation as a full-scope training simulator. Physical models installed in the system enable us to execute experiments with multi-malfunction scenario. A severe accident simulation package replaces the running simulation code when the maximum core temperature exceeds 1200 deg C and the core approaches meltdown conditions. The central control panel was simulated by soft panels, indicator and operational switches on the panels by computer graphics, displayed on 22 console boxes containing CRT. The introduction of soft panels and EWSs connected with LAN accomplished flexibility and extendibility. Some experiments by using the simulator were executed and the system has been improved based on the experience from the experiments. It is important to evaluate the effectiveness of any new system by using an actual plant size research simulator before its practical application to keep steady and safe operation of nuclear power plants. (author)

  19. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  20. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    International Nuclear Information System (INIS)

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of 'As Low As Reasonably Achievable' would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  1. Options of sustainable groundwater supply from safe aquifers in areas with elevated arsenic - a case study from Bangladesh

    Science.gov (United States)

    Jakariya, M.; Bhattacharya, P.; Bromssen, M. V.

    2008-05-01

    given to the human resource development stage of any project implementation. Local drillers need to be trained on how to handle and disseminate the invented method of installing safe tube wells. Capacity of the local level stakeholders and end users must be improved by providing training and conducting awareness campaigns. Based on the experiences and multidisciplinary research, Water Safety Plans needs to be formulated as well as adopted for long term monitoring and management of implemented mitigation options.

  2. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  3. Management of large scale coolant channel replacement programme for Indian PHWRs

    International Nuclear Information System (INIS)

    Bhatnagar, V.K.; Chadda, S.K.; Arya, R.C.

    1994-01-01

    Coolant channel assemblies form most important core components of pressurised heavy water reactors. Zirconium alloy pressure tube which form part of coolant channel assemblies are subjected to environment of high neutron flux, high pressure and temperature. Under those operating environmental conditions, the pressure tubes material undergoes degradation of metallurgical and mechanical properties in addition to dimensional changes. The coolant channels are subjected to an in-service inspection (ISI) programme for monitoring the health particularly of the pressure tubes. The en-mass replacement of pressure tubes is needed after most of the pressure tubes show unacceptable conditions for an assured safe and reliable operation. An overview of various issues pertaining to this aspect is presented. (author). 4 figs

  4. Fast reactor fuel reprocessing plant D1206: disassembly cave window 4 replacement

    International Nuclear Information System (INIS)

    Sutherland, H.G.; Beckitt, S.; Potts, A.B.

    1996-01-01

    At UKAEA's fast reactor reprocessing plant at Dounreay, the containment glass on the zinc bromide cave viewing window tank failed after 13 years active use. External shielding was fitted and the window tank subsequently drained to make it safe. Fuel cropping operations carried out behind the window were resited to enable cave work to continue whilst a project team made arrangements and plans to replace the damaged window. Because of the complexity of the task and high (alpha, beta, gamma and neutron) radiation levels in excess of 500 Sv/hr a rehearsal facility was built to develop the remote handling techniques to be employed in the task. (UK)

  5. Fuel cell end plate structure

    Science.gov (United States)

    Guthrie, Robin J.; Katz, Murray; Schroll, Craig R.

    1991-04-23

    The end plates (16) of a fuel cell stack (12) are formed of a thin membrane. Pressure plates (20) exert compressive load through insulation layers (22, 26) to the membrane. Electrical contact between the end plates (16) and electrodes (50, 58) is maintained without deleterious making and breaking of electrical contacts during thermal transients. The thin end plate (16) under compressive load will not distort with a temperature difference across its thickness. Pressure plate (20) experiences a low thermal transient because it is insulated from the cell. The impact on the end plate of any slight deflection created in the pressure plate by temperature difference is minimized by the resilient pressure pad, in the form of insulation, therebetween.

  6. Cardioprotection of Electroacupuncture for Enhanced Recovery after Surgery on Patients Undergoing Heart Valve Replacement with Cardiopulmonary Bypass: A Randomized Control Clinical Trial

    Directory of Open Access Journals (Sweden)

    Fangxiang Zhang

    2017-01-01

    Full Text Available We attempted to investigate cardioprotection of electroacupuncture (EA for enhanced recovery after surgery on patients undergoing heart valve replacement with cardiopulmonary bypass. Forty-four patients with acquired heart valve replacement were randomly allocated to the EA group or the control group. Patients in the EA group received EA stimulus at bilateral Neiguan (PC6, Ximen (PC4, Shenting (GV24, and Baihui (GV20 acupoints twenty minutes before anesthesia induction to the end of surgery. The primary end point was cardioprotection effect of electroacupuncture postoperatively and the secondary endpoints were quality of recovery and cognitive functioning postoperatively. The present study demonstrated that electroacupuncture reduced the occurrence of complications and played a role of cardioprotective effect on patients after heart valve replacement surgery with cardiopulmonary bypass, and it benefits patients more comfortable and contributes to recovery after surgery. This trial is registered with ChiCTR-IOC-16009123.

  7. Comparison between major repair and replacement options for a bridge deck life cycle assessment: A case study

    Directory of Open Access Journals (Sweden)

    Abu Dabous Saleh

    2017-01-01

    Full Text Available Material production, manufacturing, transportation, usage, and end of lifeprocessing are usually the main contributors defining the life cycle assessment (LCA. Bridge infrastructure is important to the economy and the society. Over their life cycle, highway bridges experience several stressors that can significantly affect their structural performance and therefore require rehabilitation. This paper discusses the life cycle analysis of bridge rehabilitation decisions and demonstrates the analysis with a case study of a bridge located in Ontario, Canada. The LCA of the bridge deck is analyzed for two rehabilitation strategies: major repair and replacement. The study focuses on evaluating the different life cycle phases of the bridge deck by assessing their carbon dioxide emission, energy consumption and cost. Also, the paper presents the impact of the different elements within each phase to identify the most contributing elements. The LCA of the bridge deck is analyzed and estimated with the aid of CES EduPack 2016 software that includes a database of more than 4000 different materials and more than 200 manufacturing processes. Analysis of the case study shows that material phase causes significant life cycle impact. The study concluded that the deck replacement yields higher environmental impact and life cycle cost compared to repairing and strengthening the deck.

  8. 'Safe', yet violent? Women's experiences with obstetric violence during hospital births in rural Northeast India.

    Science.gov (United States)

    Chattopadhyay, Sreeparna; Mishra, Arima; Jacob, Suraj

    2017-11-03

    The majority of maternal health interventions in India focus on increasing institutional deliveries to reduce maternal mortality, typically by incentivising village health workers to register births and making conditional cash transfers to mothers for hospital births. Based on over 15 months of ethnographically informed fieldwork conducted between 2015 and 2017 in rural Assam, the Indian state with the highest recorded rate of maternal deaths, we find that while there has been an expansion in institutional deliveries, the experience of childbirth in government facilities is characterised by obstetric violence. Poor and indigenous women who disproportionately use state facilities report both tangible and symbolic violence including iatrogenic procedures such as episiotomies, in some instances done without anaesthesia, improper pelvic examinations, beating and verbal abuse during labour, with sometimes the shouting directed at accompanying relatives. While the expansion of institutional deliveries and access to emergency obstetric care is likely to reduce maternal mortality, in the absence of humane care during labour, institutional deliveries will continue to be characterised by the paradox of "safe" births (defined as simply reducing maternal deaths) and the deployment of violent practices during labour, underscoring the unequal and complex relationship between the bodies of the poor and reproductive governance.

  9. Challenges of safe medication practice in paediatric care--a nursing perspective.

    Science.gov (United States)

    Star, Kristina; Nordin, Karin; Pöder, Ulrika; Edwards, I Ralph

    2013-05-01

    To explore nurses' experiences of handling medications in paediatric clinical practice, with a focus on factors that hinder and facilitate safe medication practices. Twenty nurses (registered nurses) from four paediatric wards at two hospitals in Sweden were interviewed in focus groups. The interviews were analysed using content analysis. Six themes emerged from the analysed interviews: the complexity specific for nurses working on paediatric wards is a hindrance to safe medication practices; nurses' concerns about medication errors cause a considerable psychological burden; the individual nurse works hard for safe medication practices and values support from other nurse colleagues; circumstances out of the ordinary are perceived as critical challenges for maintaining patient safety; nurses value clear instructions, guidelines and routines, but these are often missing, variable or changeable; management, other medical professionals, the pharmacy, the pharmaceutical industry and informatics support need to respond to the requirements of the nurses' working situations to improve safe medication practices. Weaknesses were apparent in the long chain of the medication-delivery process. A joint effort by different professions involved in that delivery process, and a nationwide collaboration between hospitals is recommended to increase safe medication practices in paediatric care. ©2013 Foundation Acta Paediatrica. Published by Blackwell Publishing Ltd.

  10. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  11. Assessment of the Swedish EQ-5D experience-based value sets in a total hip replacement population.

    Science.gov (United States)

    Nemes, Szilárd; Burström, Kristina; Zethraeus, Niklas; Eneqvist, Ted; Garellick, Göran; Rolfson, Ola

    2015-12-01

    All patients undergoing elective total hip replacement (THR) in Sweden are asked to complete a survey, including the EQ-5D. Thus far, EQ-5D values have been presented using the UK TTO value set based on hypothetical values. Shift to the use of the recently introduced Swedish experience-based value set, derived from a representative Swedish population, is an appealing alternative. To investigate how accurate the Swedish experience-based VAS value set predicts observed EQ VAS values and to compare correlations between Swedish and UK value sets including two provisional value sets derived from the THR population. Pre- and one-year postoperative data from 56,062 THR patients from the Swedish Hip Arthroplasty Register were used. Agreement between the observed and the predicted EQ VAS values was assessed with correlation. Based on pre- and postoperative data, we constructed two provisional VAS value sets. Correlations between observed and calculated values using the Swedish VAS value set were moderate (r = 0.46) in preoperative data and high (r = 0.72) in postoperative data. Correlations between UK and register-based value sets were constantly lower compared to Swedish value sets. Register-based values and Swedish values were highly correlated. The Swedish value sets are more accurate in terms of representation of the Swedish THR patients than the currently used UK TTO value set. We find it feasible to use the experience-based Swedish value sets for further presentation of EQ-5D values in the Swedish THR population.

  12. ATLAS End-cap Part II

    CERN Multimedia

    2007-01-01

    The epic journey of the ATLAS magnets is drawing to an end. On Thursday 12 July, the second end-cap of the ATLAS toroid magnet was lowered into the cavern of the experiment with the same degree of precision as the first (see Bulletin No. 26/2007). This spectacular descent of the 240-tonne component, is one of the last transport to be completed for ATLAS.

  13. Replacement value of millet for maize on performance and ...

    African Journals Online (AJOL)

    The experiment was conducted to determine the performance characteristics and haematological indices of broiler chickens fed varying levels of millet as a replacement for maize. Three hundred and thirty day old Marshal Broiler chickens were assigned to 5 dietary treatment groups. Each treatment was replicated 3 times ...

  14. Challenging Heteronormativity: Creating a Safe and Inclusive Environment for LGBTQ Students

    Science.gov (United States)

    Steck, Andy K.; Perry, David

    2018-01-01

    Lesbian, gay, bisexual, transgender, and queer/questioning (LGBTQ) youth face hostile and exclusionary learning environments. A qualitative phenomenographic method involving semistructured interviews of seven secondary school administrators was conducted to identify perceptions of experiences creating a safe and inclusive environment for students…

  15. Better prevention than cure: optimal patient preparation for renal replacement therapy.

    Science.gov (United States)

    Huang, Xiaoyan; Carrero, Juan Jesús

    2014-03-01

    A generous proportion of end-stage renal disease patients may not be adequately prepared for initiation of renal replacement therapy (RRT). Here we review potential benefits of early patient referral to nephrologists and optimal preparation for RRT. We place this evidence in the context of the epidemiological study by Kurella Tamura et al., which shows that voluntary community kidney disease screening and education is associated with better patient preparation and, importantly, improved survival upon initiation of RRT.

  16. Safe Handling of Radioisotopes

    International Nuclear Information System (INIS)

    1958-01-01

    Under its Statute the International Atomic Energy Agency is empowered to provide for the application of standards of safety for protection against radiation to its own operations and to operations making use of assistance provided by it or with which it is otherwise directly associated. To this end authorities receiving such assistance are required to observe relevant health and safety measures prescribed by the Agency. As a first step, it has been considered an urgent task to provide users of radioisotopes with a manual of practice for the safe handling of these substances. Such a manual is presented here and represents the first of a series of manuals and codes to be issued by the Agency. It has been prepared after careful consideration of existing national and international codes of radiation safety, by a group of international experts and in consultation with other international bodies. At the same time it is recommended that the manual be taken into account as a basic reference document by Member States of the Agency in the preparation of national health and safety documents covering the use of radioisotopes.

  17. Development of safe mechanism for surgical robots using equilibrium point control method.

    Science.gov (United States)

    Park, Shinsuk; Lim, Hokjin; Kim, Byeong-sang; Song, Jae-bok

    2006-01-01

    This paper introduces a novel mechanism for surgical robotic systems to generate human arm-like compliant motion. The mechanism is based on the idea of the equilibrium point control hypothesis which claims that multi-joint limb movements are achieved by shifting the limbs' equilibrium positions defined by neuromuscular activity. The equilibrium point control can be implemented on a robot manipulator by installing two actuators at each joint of the manipulator, one to control the joint position, and the other to control the joint stiffness. This double-actuator mechanism allows us to arbitrarily manipulate the stiffness (or impedance) of a robotic manipulator as well as its position. Also, the force at the end-effector can be estimated based on joint stiffness and joint angle changes without using force transducers. A two-link manipulator and a three-link manipulator with the double-actuator units have been developed, and experiments and simulation results show the potential of the proposed approach. By creating the human arm-like behavior, this mechanism can improve the performance of robot manipulators to execute stable and safe movement in surgical environments by using a simple control scheme.

  18. Does early use of enzyme replacement therapy alter the natural history of mucopolysaccharidosis I? Experience in three siblings.

    Science.gov (United States)

    Laraway, Sarah; Breen, Catherine; Mercer, Jean; Jones, Simon; Wraith, James E

    2013-07-01

    Enzyme replacement therapy is widely used as treatment for mucopolysaccharidosis I (MPS I), and there is evidence that this produces improvement in certain clinical domains. There does appear to be variation in the response of clinical features to treatment once these are established. In a reported sibling pair, when enzyme replacement therapy was commenced pre-symptomatically in the younger child, the natural history of the condition appeared to be affected. We present data from three siblings treated with enzyme replacement therapy at different ages which supports this finding. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Early identification of risk factors for refractory secondary hyperparathyroidism in patients with long-term renal replacement therapy

    NARCIS (Netherlands)

    Jorna, Francisca Hillegonda; Tobe, TJM; Huisman, RM; de Jong, PE; Plukker, JTM; Stegeman, CA

    Background. Secondary hyperparathyroidism can complicate renal replacement therapy (RRT) in patients with end-stage renal disease. Current medical therapies often result in hypercalcaemia and fail to correct hyperparathyroidism, but might be more effective at an early stage of disease. The aim of

  20. Dysfunction of mechanical heart valve prosthesis: experience with surgical management in 48 patients

    Science.gov (United States)

    Ma, Wei-Guo; Hou, Bin; Abdurusul, Adiljan; Gong, Ding-Xu; Tang, Yue; Chang, Qian; Xu, Jian-Ping

    2015-01-01

    Background Dysfunction of mechanical heart valve prostheses is an unusual but potentially lethal complication after mechanical prosthetic valve replacement. We seek to report our experience with mechanical valve dysfunction regarding etiology, surgical techniques and early outcomes. Methods Clinical data of 48 patients with mechanical valve dysfunction surgically treated between October 1996 and June 2011 were analyzed. Results Mean age was 43.7±10.9 years and 34 were female (70.8%). The median interval from primary valve implantation to dysfunction was 44.5 months (range, 1 hour to 20 years). There were 21 emergent and 27 elective reoperations. The etiology was thrombosis in 19 cases (39.6%), pannus in 12 (25%), thrombosis and pannus in 11 (22.9%), improper disc orientation in 2 (4.1%), missing leaflet in 1 (2.1%), excessively long knot end in 1 (2.1%), endogenous factor in 1 (2.1%) and unidentified in 1 (2.1%). Surgical procedure was mechanical valve replacement in 37 cases (77.1%), bioprosthetic valve replacement in 7 (14.9%), disc rotation in 2 (4.2%) and excision of excessive knot end in 1 (2.1%). Early deaths occurred in 7 patients (14.6%), due to low cardiac output in 3 (6.3%), multi-organ failure in 2 (4.2%) and refractory ventricular fibrillation in 2 (4.2%). Complications occurred in 10 patients (20.8%). Conclusions Surgical management of mechanical valve dysfunction is associated with significant mortality and morbidity. Earlier identification and prompt reoperation are vital to achieving better clinical outcomes. The high incidence of thrombosis in this series highlights the need for adequate anticoagulation and regular follow-up after mechanical valve replacement. PMID:26793354

  1. Meal replacements as a strategy for weight loss in obese hemodialysis patients.

    Science.gov (United States)

    Lassemillante, Annie-Claude M; Oliver, Veronica; Hickman, Ingrid; Murray, Eryn; Campbell, Katrina L

    2016-10-01

    Introduction There is currently limited evidence on the use or safety of meal replacements as part of a low- or very-low-calorie diet in patients with renal insufficiency; however, these are occasionally used under dietetic supervision in clinical practice to achieve the desired weight loss for kidney transplant. This case series reports on the safety and efficacy of a weight loss practice utilizing meal replacements among hemodialysis patients, who needed to lose weight for kidney transplant. Methods Five hemodialysis patients were prescribed a modified low-calorie diet (950 kcal and 100 g protein per day) comprising three meal replacements (Optifast ® ), one main meal, and two low-potassium fruits per day. Dietary requirements and restrictions were met for all participants. Dialysis prescriptions, weight (predialysis and postdialysis), interdialytic weight gain, biochemistry, and medications were monitored during the study period for up to 12 months. Findings Participants were aged between 46 and 61 years, and the median time on the low-calorie diet was 364 days. Phosphate binders were temporarily ceased for one participant for reasons unrelated to this program and no other safety concerns were recorded. The low-calorie diet resulted in energy deficits ranging from 1170 kcal to 2160 kcal, and all participants lost weight (median 7% [range 5.2%-11.4%]). The most dramatic weight change appeared to occur by week 12, and declining adherence led to erratic weight change thereafter. Discussion This modified low-calorie diet was safe and effective to use in this population. Meal replacements are a useful weight loss strategy in hemodialysis patients, therefore, offering an alternative to usual weight loss protocols. © 2016 International Society for Hemodialysis.

  2. Contact replacement for NMR resonance assignment.

    Science.gov (United States)

    Xiong, Fei; Pandurangan, Gopal; Bailey-Kellogg, Chris

    2008-07-01

    Complementing its traditional role in structural studies of proteins, nuclear magnetic resonance (NMR) spectroscopy is playing an increasingly important role in functional studies. NMR dynamics experiments characterize motions involved in target recognition, ligand binding, etc., while NMR chemical shift perturbation experiments identify and localize protein-protein and protein-ligand interactions. The key bottleneck in these studies is to determine the backbone resonance assignment, which allows spectral peaks to be mapped to specific atoms. This article develops a novel approach to address that bottleneck, exploiting an available X-ray structure or homology model to assign the entire backbone from a set of relatively fast and cheap NMR experiments. We formulate contact replacement for resonance assignment as the problem of computing correspondences between a contact graph representing the structure and an NMR graph representing the data; the NMR graph is a significantly corrupted, ambiguous version of the contact graph. We first show that by combining connectivity and amino acid type information, and exploiting the random structure of the noise, one can provably determine unique correspondences in polynomial time with high probability, even in the presence of significant noise (a constant number of noisy edges per vertex). We then detail an efficient randomized algorithm and show that, over a variety of experimental and synthetic datasets, it is robust to typical levels of structural variation (1-2 AA), noise (250-600%) and missings (10-40%). Our algorithm achieves very good overall assignment accuracy, above 80% in alpha-helices, 70% in beta-sheets and 60% in loop regions. Our contact replacement algorithm is implemented in platform-independent Python code. The software can be freely obtained for academic use by request from the authors.

  3. Choice consistency and preference stability in test-retests of discrete choice experiment and open-ended willingness to pay elicitation formats

    NARCIS (Netherlands)

    Brouwer, R.; Logar, I.; Sheremet, O.I.

    2017-01-01

    This study tests the temporal stability of preferences, choices and willingness to pay (WTP) values using both discrete choice experiment (DCE) and open-ended (OE) WTP elicitation formats. The same sample is surveyed three times over the course of two years using each time the same choice sets.

  4. Replacing soybean meal for cottonseed meal on performance of lactating dairy cows.

    Science.gov (United States)

    Imaizumi, Hugo; De Souza, Jonas; Batistel, Fernanda; Santos, Flávio Augusto Portela

    2016-01-01

    Cottonseed meal (CSM) is an alternative source of protein, and previous studies have been shown that it can replace soybean meal (SBM) without decrease animal performance. However, Brazilian CSM has a different chemical composition compared with the usual CSM reported in the literature. The objective of this experiment was to evaluate the effects of replacing SBM for Brazilian CSM on performance and energy balance of mid-lactating dairy cows. Forty-two Holstein cows were used in a replicate 3 × 3 Latin square design. Increasing contents of CSM (0, 15, and 30% of dry matter (DM)) were fed in diets to replace SBM. Milk yield and feed efficiency were linearly reduced with the replacement of CSM for SBM (P = 0.001). Milk fat content tended to increase quadratically (P = 0.07) with CSM addition. Replacing SBM for CSM affected milk protein content quadratically (P = 0.05). Milk urea nitrogen and plasma urea nitrogen (PUN) tended to respond quadratically (P = 0.06 and 0.10) when CSM replaced SBM to the diets. Variation in body weight (BW) also responded quadratically as CSM replaced SBM (P = 0.05). Altogether, the findings suggest better performance when cows receive SBM diet compared with the Brazilian CSM diet.

  5. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  6. Changing pattern of landslide risk in Europe - The SafeLand project

    Science.gov (United States)

    Nadim, F.; Kalsnes, B.

    2012-04-01

    The need to protect people and property with a changing pattern of landslide hazard and risk caused by climate change and changes in demography, and the reality for societies in Europe to live with the risk associated with natural hazards, were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). The project started on 1 May 2009 and will end on 30 April 2012. It involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://safeland-fp7.eu/. Main results achieved in SafeLand include: - Various guidelines related to landslide triggering processes and run-out modelling. - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides, and development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Guideline for landslide susceptibility, hazard and risk assessment and zoning. - New methodologies for physical and societal vulnerability assessment. - Identification of landslide hazard and risk hotspots for Europe. The results show clearly where areas with the largest landslide risk are located in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional and local climate model simulations over selected regions of Europe at spatial resolutions of 10x10 km and 2.8x2.8 km

  7. Is it the end of history for LWR safety?

    International Nuclear Information System (INIS)

    Sehgal, Bal Raj

    2004-01-01

    In this essay a parallel is drawn between the struggle for recognition, which is argued by Fukuyama as the 'motor' of human history and that waged by the LWR safety for the public to recognize the LWR plants as a source of safe nuclear power. The end of history for the ''human struggle for recognition'' as the capitalistic liberal democracy is equated with the ''end of history'' for the LWR safety to provide assurance to the public of termination of a severe accident it ever would occur. It is suggested that we are near ''the end of history'' of the LWR safety for the new-design LWR plants but fall short for the presently-installed plants. The essay bases these suggestions on an examination of the history of nuclear power development in U.S.A., but also considering the more recent regulatory and public acceptance developments in Europe and the rest of the World. (author)

  8. Unmanned Aircraft Systems Minimum Operations Performance Standards End-to-End Verification and Validation (E2-V2) Simulation

    Science.gov (United States)

    Ghatas, Rania W.; Jack, Devin P.; Tsakpinis, Dimitrios; Vincent, Michael J.; Sturdy, James L.; Munoz, Cesar A.; Hoffler, Keith D.; Dutle, Aaron M.; Myer, Robert R.; Dehaven, Anna M.; hide

    2017-01-01

    As Unmanned Aircraft Systems (UAS) make their way to mainstream aviation operations within the National Airspace System (NAS), research efforts are underway to develop a safe and effective environment for their integration into the NAS. Detect and Avoid (DAA) systems are required to account for the lack of "eyes in the sky" due to having no human on-board the aircraft. The current NAS relies on pilot's vigilance and judgement to remain Well Clear (CFR 14 91.113) of other aircraft. RTCA SC-228 has defined DAA Well Clear (DAAWC) to provide a quantified Well Clear volume to allow systems to be designed and measured against. Extended research efforts have been conducted to understand and quantify system requirements needed to support a UAS pilot's ability to remain well clear of other aircraft. The efforts have included developing and testing sensor, algorithm, alerting, and display requirements. More recently, sensor uncertainty and uncertainty mitigation strategies have been evaluated. This paper discusses results and lessons learned from an End-to-End Verification and Validation (E2-V2) simulation study of a DAA system representative of RTCA SC-228's proposed Phase I DAA Minimum Operational Performance Standards (MOPS). NASA Langley Research Center (LaRC) was called upon to develop a system that evaluates a specific set of encounters, in a variety of geometries, with end-to-end DAA functionality including the use of sensor and tracker models, a sensor uncertainty mitigation model, DAA algorithmic guidance in both vertical and horizontal maneuvering, and a pilot model which maneuvers the ownship aircraft to remain well clear from intruder aircraft, having received collective input from the previous modules of the system. LaRC developed a functioning batch simulation and added a sensor/tracker model from the Federal Aviation Administration (FAA) William J. Hughes Technical Center, an in-house developed sensor uncertainty mitigation strategy, and implemented a pilot

  9. Safe Spaces in Online Places: Social Media and LGBTQ Youth

    Science.gov (United States)

    Lucero, Leanna

    2017-01-01

    This study responds to a need for research in a fast-growing and significant area of study, that of exploring, understanding and documenting the numerous ways that multiply marginalized LGBTQ youth use social media as part of their everyday experiences in an attempt to safely navigate their lives through learning, participating, engaging,…

  10. Are Detox Diets Safe?

    Science.gov (United States)

    ... Safe Videos for Educators Search English Español Are Detox Diets Safe? KidsHealth / For Teens / Are Detox Diets ... seguras las dietas de desintoxicación? What Is a Detox Diet? The name sounds reassuring — everyone knows that ...

  11. EXPERIMENTAL RESEARCH OF REGENERATIVE FEATURES IN BONE TISSUES AROUND IMPLANTS AFTER ONE-STAGE BILATERAL TOTAL HIP REPLACEMENT

    Directory of Open Access Journals (Sweden)

    V. M. Mashkov

    2012-01-01

    Full Text Available Objective: to research the specific features of regenerative processes of bone tissue around implants after one-stage bilateral total hip replacement in experiment. Material and methods: 27 total hip replacement operations have been performed in 18 rabbits of breed "chinchilla" to which bipolar femoral endoprosthesis made of titanic alloy PT-38, one type-size, with friction pair metal-on-metal and neck-shaft angle 165 degrees have been implanted: total unilateral hip replacement operations have been performed in 9 animals (control group, one-stage bilateral total hip replacement operations have been performed in 9 animals (experimental group. During research they have been on radiological and clinical checking-up. After the experiment the animals had histological tests of the tissues around endoprosthesis components. Results and conclusions: After one-stage bilateral total hip replacement in early terms of research more expressed changes of bone tissue in the form of its thinning and decompaction were found around implants. One-stage bilateral total hip replacement did not essentially influence on the speed of osteogenesis around endoprothesis components in comparison with unilateral total hip replacement, so in late terms of observation in both groups the fixing of endoprothesis components did not differ.

  12. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  13. ETHEL's systems and facilities for safe management of tritiated wastes

    International Nuclear Information System (INIS)

    Mannone, F.; Dworschak, H.; Vassallo, G.

    1992-01-01

    The European Tritium Handling Experimental Laboratory (ETHEL) is a new tritium facility at the Commission of the European Community's Joint Research Centre, Ispra Site. The laboratory, destined to handle multigram amounts of tritium for safety related R and D purposes, is foreseen to start radioactive operations in late 1992. The general operation and maintenance of laboratory systems and future experiments will generate tritiated wastes in gaseous, liquid and solid forms. The management of such wastes under safe working conditions is a stringent laboratory requirement aimed at minimizing the risk of unacceptable tritium exposures to workers and the general public. This paper describes the main systems and facilities installed in ETHEL for the safe management of tritiated wastes

  14. Laparoscopic adrenalectomy: Single centre experience.

    LENUS (Irish Health Repository)

    O'Farrell, N J

    2012-02-01

    BACKGROUND: Laparoscopic adrenalectomy is an attractive alternative to the traditional open approach in the surgical excision of an adrenal gland. It has replaced open adrenalectomy in our institution and we review our experience to date. METHODS: All cases of laparoscopic adrenalectomies in our hospital over eight years (from 2001 to May 2009) were retrospectively reviewed. Patient demographics, diagnosis, length of hospital stay, histology and all operative and post-operative details were evaluated. RESULTS: Fifty-five laparoscopic adrenalectomies (LA) were performed on 51 patients over eight years. The mean age was 48 years (Range 16-86 years) with the male: female ratio 1:2. Twenty-three cases had a right adrenalectomy, 24 had a left adrenalectomy and the remaining four patients had bilateral adrenalectomies. 91% were successfully completed laparoscopically with five converted to an open approach. Adenomas (functional and non functional) were the leading indication for LA, followed by phaeochromocytomas. Other indications for LA included Cushing\\'s disease, adrenal malignancies and rarer pathologies. There was one mortality from necrotising pancreatitis following a left adrenalectomy for severe Cushing\\'s disease, with subsequent death 10 days later. CONCLUSION: Laparoscopic adrenalectomy is effective for the treatment of adrenal tumours, fulfilling the criteria for the ideal minimally invasive procedure. It has replaced the traditional open approach in our centre and is a safe and effective alternative. However, in the case of severe Cushing\\'s disease, laparoscopic adrenalectomy has the potential for significant adverse outcomes and mortality.

  15. Loop versus end colostomy reversal: has anything changed?

    Science.gov (United States)

    Bruns, B R; DuBose, J; Pasley, J; Kheirbek, T; Chouliaras, K; Riggle, A; Frank, M K; Phelan, H A; Holena, D; Inaba, K; Diaz, J; Scalea, T M

    2015-10-01

    Though primary repair of colon injuries is preferred, certain injury patterns require colostomy creation. Colostomy reversal is associated with significant morbidity and healthcare cost. Complication rates may be influenced by technique of diversion (loop vs. end colostomy), though this remains ill-defined. We hypothesized that reversal of loop colostomies is associated with fewer complications than end colostomies. This is a retrospective, multi-institutional study (four, level-1 trauma centers) of patients undergoing colostomy takedown for trauma during the time period 1/2006-12/2012. Data were collected from index trauma admission and subsequent admission for reversal and included demographics and complications of reversal. Student's t test was used to compare continuous variables against loop versus end colostomy. Discrete variables were compared against both groups using Chi-squared tests. Over the 6-year study period, 218 patients underwent colostomy takedown after trauma with a mean age of 30; 190 (87%) were male, 162 (74%) had penetrating injury as their indication for colostomy, and 98 (45%) experienced at least one complication. Patients in the end colostomy group (n = 160) were more likely to require midline laparotomy (145 vs. 18, p colostomy (n = 58). Local takedown of a loop colostomy is safe and leads to shorter hospital stays, less intra-operative blood loss, and fewer complications when compared to end colostomy.

  16. Experimental research on end-to-side anastomosis of peripheral nerves and effect of FK506 on end-to-side anastomosis.

    Science.gov (United States)

    Yang, L M; Wu, Y X; Zhang, X P; Li, X H

    2014-01-01

    To study the effects of end-to-side anastomosis of initially-denatured nerves at different times. 60 male Wistar albino rats were used to fabricate animal models for the experiment on end-to-side anastomosis of peripheral nerves and 50 female Wistar albino rats were used to fabricate animal models for the experiment on the effect of FK506 on end-to-side anastomosis. Bilateral common peroneal nerve, tibialis anterior muscle electrophysiological and histological examinations, tibialis anterior muscle wet muscle weight determination, and motor end plate examination were performed 3 months after operation. All recovery rates of action potential, single muscle contraction force and tetanic contraction force of the FK506 experimental group are significantly higher than those of the control group and the sectional area of muscle fiber is also higher than that of the control group of normal saline. The best time for end-to-side anastomosis of nerves should be controlled within 2 weeks and the effect of end-to-side anastomosis of nerves will gradually become unsatisfactory. FK506 plays a role in promoting functional rehabilitation following nerve end-to-side anastomosis (Tab. 7, Fig. 4, Ref. 31).

  17. Internet end-to-end performance monitoring for the High Energy Nuclear and Particle Physics community

    International Nuclear Information System (INIS)

    Matthews, W.

    2000-01-01

    Modern High Energy Nuclear and Particle Physics (HENP) experiments at Laboratories around the world present a significant challenge to wide area networks. Petabytes (1015) or exabytes (1018) of data will be generated during the lifetime of the experiment. Much of this data will be distributed via the Internet to the experiment's collaborators at Universities and Institutes throughout the world for analysis. In order to assess the feasibility of the computing goals of these and future experiments, the HENP networking community is actively monitoring performance across a large part of the Internet used by its collaborators. Since 1995, the pingER project has been collecting data on ping packet loss and round trip times. In January 2000, there are 28 monitoring sites in 15 countries gathering data on over 2,000 end-to-end pairs. HENP labs such as SLAC, Fermi Lab and CERN are using Advanced Network's Surveyor project and monitoring performance from one-way delay of UDP packets. More recently several HENP sites have become involved with NLANR's active measurement program (AMP). In addition SLAC and CERN are part of the RIPE test-traffic project and SLAC is home for a NIMI machine. The large End-to-end performance monitoring infrastructure allows the HENP networking community to chart long term trends and closely examine short term glitches across a wide range of networks and connections. The different methodologies provide opportunities to compare results based on different protocols and statistical samples. Understanding agreement and discrepancies between results provides particular insight into the nature of the network. This paper will highlight the practical side of monitoring by reviewing the special needs of High Energy Nuclear and Particle Physics experiments and provide an overview of the experience of measuring performance across a large number of interconnected networks throughout the world with various methodologies. In particular, results from each project

  18. Internet end-to-end performance monitoring for the High Energy Nuclear and Particle Physics community

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, W.

    2000-02-22

    Modern High Energy Nuclear and Particle Physics (HENP) experiments at Laboratories around the world present a significant challenge to wide area networks. Petabytes (1015) or exabytes (1018) of data will be generated during the lifetime of the experiment. Much of this data will be distributed via the Internet to the experiment's collaborators at Universities and Institutes throughout the world for analysis. In order to assess the feasibility of the computing goals of these and future experiments, the HENP networking community is actively monitoring performance across a large part of the Internet used by its collaborators. Since 1995, the pingER project has been collecting data on ping packet loss and round trip times. In January 2000, there are 28 monitoring sites in 15 countries gathering data on over 2,000 end-to-end pairs. HENP labs such as SLAC, Fermi Lab and CERN are using Advanced Network's Surveyor project and monitoring performance from one-way delay of UDP packets. More recently several HENP sites have become involved with NLANR's active measurement program (AMP). In addition SLAC and CERN are part of the RIPE test-traffic project and SLAC is home for a NIMI machine. The large End-to-end performance monitoring infrastructure allows the HENP networking community to chart long term trends and closely examine short term glitches across a wide range of networks and connections. The different methodologies provide opportunities to compare results based on different protocols and statistical samples. Understanding agreement and discrepancies between results provides particular insight into the nature of the network. This paper will highlight the practical side of monitoring by reviewing the special needs of High Energy Nuclear and Particle Physics experiments and provide an overview of the experience of measuring performance across a large number of interconnected networks throughout the world with various methodologies. In particular, results

  19. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  20. Microstructure, local mechanical properties and stress corrosion cracking susceptibility of an SA508-52M-316LN safe-end dissimilar metal weld joint by GTAW

    Energy Technology Data Exchange (ETDEWEB)

    Ming, Hongliang; Zhu, Ruolin [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning KeyLaboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); University of Chinese Academy of Sciences, 19 Yuquan Road, Beijing 100049 (China); Zhang, Zhiming [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning KeyLaboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Wang, Jianqiu, E-mail: wangjianqiu@imr.ac.cn [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning KeyLaboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Han, En.-Hou.; Ke, Wei [Key Laboratory of Nuclear Materials and Safety Assessment, Liaoning KeyLaboratory for Safety and Assessment Technique of Nuclear Materials, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Su, Mingxing [Shanghai Research Center for Weld and Detection Engineering Technique of Nuclear Equipment, Shanghai 201306 (China)

    2016-07-04

    The microstructure, local mechanical properties and local stress corrosion cracking susceptibility of an SA508-52M-316LN domestic dissimilar metal welded safe-end joint used for AP1000 nuclear power plant prepared by automatic gas tungsten arc welding was studied in this work by optical microscopy, scanning electron microscopy (with electron back scattering diffraction and an energy dispersive X-ray spectroscopy system), micro-hardness testing, local mechanical tensile testing and local slow strain rate tests. The micro-hardness, local mechanical properties and stress corrosion cracking susceptibility across this dissimilar metal weld joint vary because of the complex microstructure across the fusion area and the dramatic chemical composition change across the fusion lines. Briefly, Type I boundaries and Type II boundaries exist in 52Mb near the SA508-52Mb interface, a microstructure transition was found in SA508 heat affected zone, the residual strain and grain boundary character distribution changes as a function of the distance from the fusion boundary in 316LN heat affected zone, micro-hardness distribution and local mechanical properties along the DMWJ are heterogeneous, and 52Mw-316LN interface has the highest SCC susceptibility in this DMWJ while 316LN base metal has the lowest one.

  1. CERN: End of LEP's Z era

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-11-15

    Full text: Achapter of history at CERN's LEP electron-positron collider closed in October when the four big experiments, Aleph, Delphi, L3 and Opal, logged their final data at the Z energy, just over six years after LEP's first Z was detected. The LEP Z era has been one of great success, both in terms of physics results and the advances which have been made with the machine itself. LEP now takes a step towards becoming LEP2, when the energy is wound up from around 45 GeV to about 70 GeV per beam (September, page 6). By the end of LEP's 1995 run, each of the four LEP experiments had seen almost five million Zs. Now the spotlight at LEP shifts to producing pairs of W particles, the electrically charged counterparts of the Z. LEP's first Zs were recorded in August 1989, one month after the machine's first circulating beam. The 30,000 Z decays recorded by each experiment in 1989 confirmed that matter comes in just three distinct families of quarks and leptons. The values of the Z mass and width quoted in 1990 were 91.161 ± 0.031 GeV and 2.534 ± 0.027 GeV. By the beginning of 1995, these had been fine-tuned to the extraordinary accuracy of 91.1884 ± 0.0022 GeV and 2.4963 ± 0.0032 GeV, and when data from this year's run is included, will be even better. These results, combined with precision data from neutrino experiments and from Fermilab's Tevatron protonantiproton collider, have put the Standard Model of quarks and leptons through its most gruelling test yet. Right from the start, collaboration between LEP experiments and the accelerator team has been close, with frequent scheduling meetings determining how the machine is run. For the first few years, LEP ran on a diet of four bunches of electrons and four of positrons, but by the end of 1992, a way had been found to increase the luminosity by squeezing in more bunches. In 1993, the 'pretzel' scheme (October 1992, page 17), so called because of the shape traced out by the circulating beams, was running with eight

  2. FAST: towards safe and effective subcutaneous immunotherapy of persistent life-threatening food allergies

    Directory of Open Access Journals (Sweden)

    Zuidmeer-Jongejan Laurian

    2012-03-01

    Full Text Available Abstract The FAST project (Food Allergy Specific Immunotherapy aims at the development of safe and effective treatment of food allergies, targeting prevalent, persistent and severe allergy to fish and peach. Classical allergen-specific immunotherapy (SIT, using subcutaneous injections with aqueous food extracts may be effective but has proven to be accompanied by too many anaphylactic side-effects. FAST aims to develop a safe alternative by replacing food extracts with hypoallergenic recombinant major allergens as the active ingredients of SIT. Both severe fish and peach allergy are caused by a single major allergen, parvalbumin (Cyp c 1 and lipid transfer protein (Pru p 3, respectively. Two approaches are being evaluated for achieving hypoallergenicity, i.e. site-directed mutagenesis and chemical modification. The most promising hypoallergens will be produced under GMP conditions. After pre-clinical testing (toxicology testing and efficacy in mouse models, SCIT with alum-absorbed hypoallergens will be evaluated in phase I/IIa and IIb randomized double-blind placebo-controlled (DBPC clinical trials, with the DBPC food challenge as primary read-out. To understand the underlying immune mechanisms in depth serological and cellular immune analyses will be performed, allowing identification of novel biomarkers for monitoring treatment efficacy. FAST aims at improving the quality of life of food allergic patients by providing a safe and effective treatment that will significantly lower their threshold for fish or peach intake, thereby decreasing their anxiety and dependence on rescue medication.

  3. FAST: towards safe and effective subcutaneous immunotherapy of persistent life-threatening food allergies

    Science.gov (United States)

    2012-01-01

    The FAST project (Food Allergy Specific Immunotherapy) aims at the development of safe and effective treatment of food allergies, targeting prevalent, persistent and severe allergy to fish and peach. Classical allergen-specific immunotherapy (SIT), using subcutaneous injections with aqueous food extracts may be effective but has proven to be accompanied by too many anaphylactic side-effects. FAST aims to develop a safe alternative by replacing food extracts with hypoallergenic recombinant major allergens as the active ingredients of SIT. Both severe fish and peach allergy are caused by a single major allergen, parvalbumin (Cyp c 1) and lipid transfer protein (Pru p 3), respectively. Two approaches are being evaluated for achieving hypoallergenicity, i.e. site-directed mutagenesis and chemical modification. The most promising hypoallergens will be produced under GMP conditions. After pre-clinical testing (toxicology testing and efficacy in mouse models), SCIT with alum-absorbed hypoallergens will be evaluated in phase I/IIa and IIb randomized double-blind placebo-controlled (DBPC) clinical trials, with the DBPC food challenge as primary read-out. To understand the underlying immune mechanisms in depth serological and cellular immune analyses will be performed, allowing identification of novel biomarkers for monitoring treatment efficacy. FAST aims at improving the quality of life of food allergic patients by providing a safe and effective treatment that will significantly lower their threshold for fish or peach intake, thereby decreasing their anxiety and dependence on rescue medication. PMID:22409908

  4. Safe Anesthesia For Every Tot

    DEFF Research Database (Denmark)

    Weiss, Markus; Vutskits, Laszlo; Hansen, Tom G

    2015-01-01

    PURPOSE OF REVIEW: The term 'safe use of anesthesia in children is ill-defined and requires definition of and focus on the 'safe conduct of pediatric anesthesia'. RECENT FINDINGS: The Safe Anesthesia For Every Tot initiative (www.safetots.org) has been set up during the last year to focus...... on the safe conduct of pediatric anesthesia. This initiative aims to provide guidance on markers of quality anesthesia care. The introduction and implementation of national regulations of 'who, where, when and how' are required and will result in an improved perioperative outcome in vulnerable children....... The improvement of teaching, training, education and supervision of the safe conduct of pediatric anesthesia are the main goals of the safetots.org initiative. SUMMARY: This initiative addresses the well known perioperative risks in young children, perioperative causes for cerebral morbidity as well as gaps...

  5. Plasma characteristics of the end-cell of the GAMMA 10 tandem mirror for the divertor simulation experiment

    International Nuclear Information System (INIS)

    Nakashima, Y.; Sakamoto, M.; Yoshikawa, M.; Takeda, H.; Ichimura, K.; Hosoi, K.; Hirata, M.; Ichimura, M.; Ikezoe, R.; Imai, T.; Kariya, T.; Katanuma, I.; Kohagura, J.; Minami, R.; Numakura, T.; Oki, K.; Ueda, H.; Asakura, Nobuyuki; Furuta, T.; Hatayama, A.; Toma, M.; Hirooka, Y.; Masuzaki, S.; Sagara, A.; Shoji, M.; Kado, S.; Matsuura, H.; Nagata, S.; Nishino, N.; Ohno, N.; Tonegawa, A.; Ueda, Y.

    2012-11-01

    In this paper, detailed characteristics and controllability of plasmas emitted from the end-cell of the GAMMA 10 tandem mirror are described from the viewpoint of divertor simulation studies. The energy analysis of ion flux by using end-loss ion energy analyzer (ELIEA) proved that the obtained high ion temperature (100 - 400 eV) was comparable to SOL plasma parameters in toroidal devices and was controlled by changing the ICRF power. Parallel ion temperature T i∥ determined from the probe and calorimeter shows a linear relationship with the ICRF power in the central-cell and agrees with the results of ELIEA. Additional ICRF heating revealed a significant enhancement of particle flux, which indicated an effectiveness of additional plasma heating in adjacent cells toward the improvement of the performance. Superimposing the ECH pulse of 380 kW, 5 ms attained the maximum heat-flux more than 10 MW/m 2 on axis. This value comes up to the heat-load of the divertor plate of ITER, which gives a clear prospect of generating the required heat density for divertor studies by building up heating systems to the end-mirror cell. Initial results of plasma irradiation experiment and construction of new divertor module are also described. (author)

  6. Front end designs for the 7-GeV advanced photon source

    International Nuclear Information System (INIS)

    Shu, D.; Barraza, J.; Sanchez, T.; Nielsen, R.W.; Collins, J.T.; Kuzay, T.M.

    1992-01-01

    The conceptual designs for the insertion device (ID) and bending magnet (BM) front ends have been completed for the 7-GeV Advanced Photon Source (APS) under construction at Argonne National Laboratory. These designs satisfy the generic front end functions. However, the high power and high heat fluxes imposed by the X-ray sources of the 7-GeV APS have presented various design engineering challenges for the front end. Consideration of such challenges and their solutions have led to novel and advanced features including modularized systems, enhanced heat transfer concepts in the fixed mask and the photon shutter designs, a radiation safety philosophy based on multiple photon shutters for a fail-safe operation, a sub-micron resolution beam position monitor for beam monitoring and ring feedback information, and minimal beam filtering concepts to deliver maximized beam power and spectra to the experimenters. The criteria and special features of the front end design are discussed in this paper

  7. Aortic valve replacement during acute rheumatic fever.

    Science.gov (United States)

    Khan, A; Chi, S; Gonzalez-Lavin, L

    1978-07-01

    Emergency aortic valve replacement was performed during an attack of acute rheumatic fever in a 12-year-old black boy. He had an uneventful recovery and has remained asymptomatic 27 months after operation. In the light of this experience and that of others, one might conclude that the decision to operate on these patients should be based on the severity of the haemodynamic derangement rather than on the state of activity in the rheumatic process.

  8. The CBM Experiment at FAIR-New challenges for Front-End Electronics, Data Acquisition and Trigger Systems

    International Nuclear Information System (INIS)

    Mueller, Walter F J

    2006-01-01

    The 'Compressed Baryonic Matter' (CBM) experiment at the new 'Facility for Antiproton and Ion Research' (FAIR) in Darmstadt is designed to study the properties of highly compressed baryonic matter produced in nucleus-nucleus collisions in the 10 to 45 A GeV energy range. One of the key observables is hidden (J/ψ) and open (D 0 , D ± ) charm production. To achieve an adequate sensitivity extremely high interaction rates of up to 10 7 events/second are required, resulting in major technological challenges for the detectors, front-end electronics and data processing. The front-end electronics will be self-triggered, autonomously detect particle hits, and output hit parameter together with a precise absolute time-stamp. Several layers of feature extraction and event selection will reduce the primary data flow of about 1 TByte/sec to a level of 1 GByte/sec. This new architecture avoids many limitations of conventional DAQ/Trigger systems and is for example essential for open charm detection, which requires the reconstruction of displaced vertices, in a high-rate heavy ion environment

  9. Understanding why people do or do not engage in activities following total joint replacement: a longitudinal qualitative study.

    Science.gov (United States)

    Webster, F; Perruccio, A V; Jenkinson, R; Jaglal, S; Schemitsch, E; Waddell, J P; Venkataramanan, V; Bytautas, J; Davis, A M

    2015-06-01

    Numerous studies report large and significant improvements in basic mobility and activities of daily living following total hip or knee replacement (TJR). Nevertheless, quantitative research has shown minimal increase in participation in activities that benefit overall health. This study explored why people do or do not engage in activities following hip or knee TJR. This was a longitudinal qualitative study. Sampling was guided by constructivist grounded theory and data collected using open-ended, semi-structured interviews. Participants were recruited using maximum variation sampling based on age, sex and joint replaced (hip or knee). Data were analysed using a constant comparative approach and coded for thematic patterns and relationships from which overarching themes were constructed. Twenty-nine patients participated in interviews prior to, and 8 and 18 months post following TJR. A high degree of variability with regard to participants' return to activities was found and five emergent themes were identified that accounted for this variability. These themes highlight the importance of issues beyond medical factors alone, such as socio-cultural factors that partially determine participants' participation in activity following TJR. Findings suggest that multi-faceted experiences impact participation in activity following TJR. These experiences include changes in identity and lifestyle that preclude a 'return to normal'. There is an urgent need for supports to increase people's activity post-TJR in order to facilitate enhancement of post-surgery levels of engagement. Approaches that take into consideration more personalized interventions may be critical to promoting healthy aging in people with TJR. Copyright © 2015 Osteoarthritis Research Society International. Published by Elsevier Ltd. All rights reserved.

  10. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  11. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  12. Aortic Root Replacement for Children With Loeys-Dietz Syndrome.

    Science.gov (United States)

    Patel, Nishant D; Alejo, Diane; Crawford, Todd; Hibino, Narutoshi; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2017-05-01

    Loeys-Dietz syndrome (LDS) is an aggressive aortopathy with a proclivity for aortic aneurysm rupture and dissection at smaller diameters than other connective tissue disorders. We reviewed our surgical experience of children with LDS to validate our guidelines for prophylactic aortic root replacement (ARR). We reviewed all children (younger than 18 years) with a diagnosis of LDS who underwent ARR at our institution. The primary endpoint was mortality, and secondary endpoints included complications and the need for further interventions. Thirty-four children with LDS underwent ARR. Mean age at operation was 10 years, and 15 (44%) were female. Mean preoperative root diameter was 4 cm. Three children (9%) had composite ARR with a mechanical prosthesis, and 31 (91%) underwent valve-sparing ARR. Concomitant procedures included arch replacement in 2 (6%), aortic valve repair in 1 (3%), and patent foramen ovale closure in 16 (47%). There was no operative mortality. Two children (6%) required late replacement of the ascending aorta, 5 (15%) required arch replacement, 1 (3%) required mitral valve replacement, and 2 (6%) had coronary button aneurysms/pseudoaneurysms requiring repair. Three children required redo valve-sparing ARR after a Florida sleeve procedure, and 2 had progressive aortic insufficiency requiring aortic valve replacement after a valve-sparing procedure. There were 2 late deaths (6%). These data confirm the aggressive aortopathy of LDS. Valve-sparing ARR should be performed when feasible to avoid the risks of prostheses. Serial imaging of the arterial tree is critical, given the rate of subsequent intervention. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  13. Spouses of Military Members' Experiences and Insights: Qualitative Analysis of Responses to an Open-Ended Question in a Survey of Health and Wellbeing

    Science.gov (United States)

    Runge, Catherine E.; Waller, Michael; MacKenzie, Alison; McGuire, Annabel C. L.

    2014-01-01

    Introduction There are few studies on the experiences of spouses of military members, with most focused on adverse impacts of deployment. Responses to an open-ended question in a survey of spouses' health and wellbeing enabled access to perceptions and insights on a broad range of topics. The objective of this investigation was to examine how respondents used the open-ended question and what they discussed, in aim of informing support service agencies and spouses of military members. Methods Thematic analysis was conducted on responses to the open-ended question. Descriptive analysis was performed on the demographics, military member characteristics and self-reported health of respondents and non-respondents to the open-ended question. Findings Over a quarter (28.5%) of the 1,332 survey participants answered the open-ended question, with respondents having a significantly higher level of education than non–respondents. Respondents expressed negative and positive experiences and insights on military life, provided personal information, commented on the survey, and qualified their responses to closed-ended questions. Topics included ‘inadequate support’, ‘deployment impacts’, ‘suggestions for supporting agencies’, ‘appraisal of experiences’ and ‘coping strategies’. Conclusions This investigation uncovered issues of importance to spouses of military members that were not included or identified in a quantitative study. The findings provide a platform from which to explore these issues further, particularly the impact of military life on the non-serving spouse's career. The findings also provide support agencies with evidence to strengthen their services and they give spouses an opportunity to reflect on their own and others' feelings and evaluations of military life. PMID:25479135

  14. An update on renal replacement therapy in Europe: ERA-EDTA Registry data from 1997 to 2006

    NARCIS (Netherlands)

    Kramer, Anneke; Stel, Vianda; Zoccali, Carmine; Heaf, James; Ansell, David; Grönhagen-Riska, Carola; Leivestad, Torbjørn; Simpson, Keith; Pálsson, Runólfur; Postorino, Maurizio; Jager, Kitty

    2009-01-01

    Background. Recent studies have indicated a stabilization in the incidence rates of renal replacement therapy (RRT) for end-stage renal disease (ESRD) in a number of European countries. The aim of this study was to provide an update on the incidence, prevalence and outcomes of RRT in Europe over the

  15. Replacing coal by tire powder in ceramic industry

    Energy Technology Data Exchange (ETDEWEB)

    Mothe, C.G. [Dept. de Processos Organicos, Escola de Quimica/CT/UFRJ, Rio de Janeiro, RJ (Brazil); Mothe Filho, H.F. [Dept. de Geociencias, Inst. de Agronomia/UFRRJ, Seropedica, RJ (Brazil)

    2005-07-01

    Nowadays preserving nature, recycling or reusing materials are good policies. Around ten million tires are put out by year in Brazil, and it is not known for how long they will remain in environment till their complete degradation. This research used tires to replace coal in ceramic processing. In this way it helps to protect environment, to reduce the consumption of mineral deposits and to save money. Results show that tire powder can replace coal to obtain ceramic material, using one percent of tire. Experiments were carried out using TA instruments SDT 2960, in air or nitrogen atmospheres, at heating rate of 10 C/min., flow 120 ml/min. TG/DTA curves of tire and coal have exothermic events at close temperatures between 450-600 C. At range of temperatures clay have endothermic events. (orig.)

  16. Analysis of fuel end-temperature peaking

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Z.; Jiang, Q.; Lai, L.; Shams, M. [CANDU Energy Inc., Fuel Engineering Dept., Mississauga, Ontario (Canada)

    2013-07-01

    During normal operation and refuelling of CANDU® fuel, fuel temperatures near bundle ends will increase due to a phenomenon called end flux peaking. Similar phenomenon would also be expected to occur during a postulated large break LOCA event. The end flux peaking in a CANDU fuel element is due to the fact that neutron flux is higher near a bundle end, in contact with a neighbouring bundle or close to heavy water coolant, than in the bundle mid-plane, because of less absorption of thermal neutrons by Zircaloy or heavy water than by the UO{sub 2} material. This paper describes Candu Energy experience in analysing behaviour of bundle due to end flux peaking using fuel codes FEAT, ELESTRES and ELOCA. (author)

  17. A safe place with space for learning: Experiences from an interprofessional training ward.

    Science.gov (United States)

    Hallin, Karin; Kiessling, Anna

    2016-01-01

    Interprofessional learning in a real ward context effectively increases collaborative and professional competence among students. However, less is known on the processes behind this. The aim of this study was to explore medical, nurse, physiotherapy, and occupational therapy students' perspectives on the process of their own learning at an interprofessional training ward (IPTW). We performed a qualitative content analysis on free-text answers of 333 student questionnaires from the years 2004 to 2011. Two main themes emerged: first, students found that the IPTW provided an enriching learning environment--a safe place with space. It included authentic and relevant patients, well-composed and functioning student teams, competent and supportive supervisors, and adjusted ward structures to support learning. Second, they developed an awareness of their own development with faith in the future--from chaos to clarity. It included personal, professional, and interprofessional development towards a comprehensive view of practice and a faith in their ability to work as professionals in the future. Our findings are discussed with a social constructivist perspective. This study suggests that when an IPTW provides a supportive and permissive learning environment with possibilities to interact with one another--a safe place with space--it enables students to move from insecurity to faith in their abilities--from chaos to clarity. However, if the learning environment is impaired, the students' development could be halted.

  18. Strategies for early metabolic disturbances in patients with an end jejunostomy or end ileostomy. Experience from a specialized Home Parenteral Nutrition (HPN center

    Directory of Open Access Journals (Sweden)

    Michał Ławiński

    2016-03-01

    Full Text Available Introduction : An end stoma syndrome is usually the result of an intentional surgical intervention in the course of staged treatment or a complication of surgery. These patients most frequently suffer from water and electrolyte disturbances, malnutrition syndromes caused by malabsorption of trace elements and/or vitamins, and undernutrition. Aim : To present early metabolic disturbances observed in patients with an end jejunostomy or end ileostomy syndrome on the first day of their hospitalization in a specialist Home Parenteral Nutrition (HPN center. Material and methods : The study included 142 patients with an end stoma syndrome (76 women and 66 men, hospitalized between 2004 and 2014. Patients were divided into two main groups. Group A consisted of 90 patients with an end jejunostomy and group B consisted of 52 patients with an end ileostomy. Results : After comparing the patients with an end jejunostomy vs. those with an end ileostomy, significant differences were found as regards pH (7.34 vs. 7.39, p = 0.043 and BE (3.24 vs. –0.86, p = 0.005. Depending on the lack or possibility of oral food intake, patients in the end jejunostomy group had different levels of the markers phosphate, Mg, Ca, urea, and creatinine, with all of these parameters within normal laboratory limits. When the end ileostomy group was divided into subgroups depending on the lack or possibility of oral food intake, differences in C-reactive protein activity were found (55.6 vs. 25.7, p = 0.041. Conclusions : Patients with an end jejunostomy syndrome are more prone to metabolic acidosis with significant alkali deficiencies.

  19. The end-state comfort effect in bimanual grip selection.

    Science.gov (United States)

    Fischman, Mark G; Stodden, David F; Lehman, Davana M

    2003-03-01

    During a unimanual grip selection task in which people pick up a lightweight dowel and place one end against targets at variable heights, the choice of hand grip (overhand vs. underhand) typically depends on the perception of how comfortable the arm will be at the end of the movement: an end-state comfort effect. The two experiments reported here extend this work to bimanual tasks. In each experiment, 26 right-handed participants used their left and right hands to simultaneously pick up two wooden dowels and place either the right or left end against a series of 14 targets ranging from 14 to 210 cm above the floor. These tasks were performed in systematic ascending and descending orders in Experiment 1 and in random order in Expiment 2. Results were generally consistent with predictions of end-state comfort in that, for the extreme highest and lowest targets, participants tended to select opposite grips with each hand. Taken together, our findings are consistent with the concept of constraint hierarchies within a posture-based motion-planning model.

  20. One stage functional end-to-end stapled intestinal anastomosis and resection performed by nonexpert surgeons for the treatment of small intestinal obstruction in 30 dogs.

    Science.gov (United States)

    Jardel, Nicolas; Hidalgo, Antoine; Leperlier, Dimitri; Manassero, Mathieu; Gomes, Aymeric; Bedu, Anne Sophie; Moissonnier, Pierre; Fayolle, Pascal; Begon, Dominique; Riquois, Elisabeth; Viateau, Véronique

    2011-02-01

    To describe stapled 1-stage functional end-to-end intestinal anastomosis for treatment of small intestinal obstruction in dogs and evaluate outcome when the technique is performed by nonexpert surgeons after limited training in the technique. Case series. Dogs (n=30) with intestinal lesions requiring an enterectomy. Stapled 1-stage functional end-to-end anastomosis and resection using a GIA-60 and a TA-55 stapling devices were performed under supervision of senior residents and faculty surgeons by junior surgeons previously trained in the technique on pigs. Procedure duration and technical problems were recorded. Short-term results were collected during hospitalization and at suture removal. Long-term outcome was established by clinical and ultrasonographic examinations at least 2 months after surgery and from written questionnaires, completed by owners. Mean±SD procedure duration was 15±12 minutes. Postoperative recovery was uneventful in 25 dogs. One dog had anastomotic leakage, 1 had a localized abscess at the transverse staple line, and 3 dogs developed an incisional abdominal wall abscess. No long-term complications occurred (follow-up, 2-32 months). Stapled 1-stage functional end-to-end anastomosis and resection is a fast and safe procedure in the hand of nonexpert but trained surgeons. © Copyright 2011 by The American College of Veterinary Surgeons.

  1. The safe home project.

    Science.gov (United States)

    Arphorn, Sara; Jiraniratisai, Sopaphan; Rungtakul, Rungsri; Phutta, Nikom

    2011-12-01

    The Thai Health Promotion Foundation supported the Improvement of Quality of Life of Informal Workers project in Ban Luang District, Amphur Photaram, Ratchaburi Province. There were many informal workers in Ban Luang District. Sweet-crispy fish producers in Ban Luang were the largest group among the sweet-crispy fish producers in Thailand. This project was aimed at improving living and working conditions of informal workers, with a focus on the sweet-crispy fish group. Good practices of improved living and working conditions were used to help informal workers build safe, healthy and productive work environments. These informal workers often worked in substandard conditions and were exposed to various hazards in the working area. These hazards included risk of exposure to hot work environment, ergonomics-related injuries, chemical hazards, electrical hazards etc. Ergonomics problems were commonly in the sweet-crispy fish group. Unnatural postures such as prolonged sitting were performed dominantly. One hundred and fifty informal workers participated in this project. Occupational health volunteers were selected to encourage occupational health and safety in four groups of informal workers in 2009. The occupational health volunteers trained in 2008 were farmers, beauty salon workers and doll makers. The occupational health and safety knowledge is extended to a new informal worker group: sweet-crispy fish producer, in 2009. The occupational health and safety training for sweet-crispy fish group is conducted by occupational health volunteers. The occupational health volunteers increased their skills and knowledge assist in to make safe home and safe community through participatory oriented training. The improvement of living and working condition is conducted by using a modified WISH, Work Improvement for Safe Home, checklist. The plans of improvement were recorded. The informal workers showed improvement mostly on material handling and storage. The safe uses and safe

  2. Effect of dietary citric acid supplementation and partial replacement ...

    African Journals Online (AJOL)

    Beluga is one of the most important fishes in Caspian Sea. The purpose of this experiment were to evaluate the effect of soybean meal (SBM) as a fishmeal (FM) partial replacement and citric acid (CA) supplement on the calcium (Ca) and phosphorus (P) of muscle, scute and serum of Beluga diets. Three isonitrogenous and ...

  3. Coloured cornea replacements with anti-infective properties: expanding the safe use of silver nanoparticles in regenerative medicine

    Science.gov (United States)

    Alarcon, E. I.; Vulesevic, B.; Argawal, A.; Ross, A.; Bejjani, P.; Podrebarac, J.; Ravichandran, R.; Phopase, J.; Suuronen, E. J.; Griffith, M.

    2016-03-01

    Despite the broad anti-microbial and anti-inflammatory properties of silver nanoparticles (AgNPs), their use in bioengineered corneal replacements or bandage contact lenses has been hindered due to their intense yellow coloration. In this communication, we report the development of a new strategy to pre-stabilize and incorporate AgNPs with different colours into collagen matrices for fabrication of corneal implants and lenses, and assessed their in vitro and in vivo activity.Despite the broad anti-microbial and anti-inflammatory properties of silver nanoparticles (AgNPs), their use in bioengineered corneal replacements or bandage contact lenses has been hindered due to their intense yellow coloration. In this communication, we report the development of a new strategy to pre-stabilize and incorporate AgNPs with different colours into collagen matrices for fabrication of corneal implants and lenses, and assessed their in vitro and in vivo activity. Electronic supplementary information (ESI) available: Collagen hydrogel, moulded as a cornea, prepared containing collagen protected AgNPs and representative images for collagen hydrogels, moulded as corneas, containing Blue AgNPs either unprotected or protected with LL37-SH; representative TEM images for Green-1 AgNPs prepared in this work; changes on surface plasmon band after synthesis for Green-2 AgNPs without LL37-SH; representative picture of the powder obtained for Green-1 AgNPs capped with LL37-SH after 72 h lyophilization, see main text; representative TEM images for Blue and Green-1 AgNPs prepared in this work; absorption spectra for the supernatants for collagen hydrogels containing Blue AgNPs; absorbance at 600 nm of PAO1 cultures prepared in 25% LB media incubated for 14 h at 37 °C in the presence of different concentrations of AgNPs, Green-1 or Blue, or silver nitrate; HECC cell density (cells per cm2) measured on gels with and without silver nitrate after 1 day of cell incubation; total silver concentration

  4. Preparing an ATLAS toroid magnet end-cap for lowering

    CERN Multimedia

    Claudia Marcelloni

    2007-01-01

    One of the two 13-m high toroid magnet end-caps for the ATLAS experiment being transported from the construction hall to the experimental area. The end-cap will be lowered into the ATLAS cavern and attached to an end of the detector.

  5. Topform '92: the safe and reliable operation of LWR NPPs. Vol. II

    International Nuclear Information System (INIS)

    1993-01-01

    Out of the 54 poster papers contained in the proceedings, 53 were inputted to the INIS system. The topics covered include operational training and simulation, inspection, maintenance and component replacement, backfitting experience, instrumentation, man-machine interface, software and procedures. (Z.S.)

  6. DAQ system for testing RPC front-end electronics of the INO experiment

    International Nuclear Information System (INIS)

    Hari Prasad, K.; Sukhwani, Menka; Kesarkar, Tushar A.; Kumar, Sandeep; Chandratre, V.B.; Das, D.; Shinde, R.R.; Satyanarayana, B.

    2015-01-01

    The Resistive Plate Chamber (RPC) is the active detector element in the INO experiment. The in-house developed ANUSPARSH-III ASICs are being used as front-end electronics of the detector. The 2 m X 2 m RPC being used has 64-readout channels on X-side and 64-readout channels on Y-side. In order to test and validate the FE along with the RPC, a 64-channel DAQ system has been designed and developed. The detector parameters to be measured are noise rate, efficiency, hit pattern register and time resolution. The salient features of the DAQ system are: 64-channel LVDS receiver in FPGA, FPGA based parameter calculations and a micro controller for acquiring the processed data from FPGAs and sent through Ethernet and USB interfaces. The DAQ system consists of following parts: Two FPGAs each receiving 32 LVDS channels, FPGA firm-ware, micro controller firm-ware, Ethernet interface, embedded web server hosting data analysis software, USB interface, and Lab-windows based data analysis software. The DAQ system has been tested at TIFR with 1 m X 1 m RPC

  7. Social Influence and Safe Behavior in Manufacturing

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft

    2018-01-01

    This research presents a model designed to explore the cognitive and social mechanisms that mediate the relationship between organizational safety climate and safety behaviors. Specifically the presented research demonstrates the usefulness of Sussmann and Vecchio (1982) social influence interpre......This research presents a model designed to explore the cognitive and social mechanisms that mediate the relationship between organizational safety climate and safety behaviors. Specifically the presented research demonstrates the usefulness of Sussmann and Vecchio (1982) social influence...... interpretation of worker motivation to understand safety motivation. Survey data was collected from 428 employees in seven factories within the electronics industry in China. The data were analyzed using structural modelling. The results suggest that factory workers with more knowledge about the products...... that the total effects of a factory workers experience with safety and health problems seems to affect safe work behavior negatively, and that this is caused by a decrease in confidence and abilities to work safely. In relation to practical implications the present study demonstrate how manufacturing managers...

  8. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  9. Experimental evaluation of end-to-end delay in switched Ethernet application in the automotive domain

    OpenAIRE

    Beretis , Kostas; Symeonidis , Ieroklis

    2013-01-01

    International audience; This article presents an approach for deriving upper bound for end-to-end delay in a double star switched Ethernet network. Four traffic classes, following a strict priority queuing policy, were considered. The theoretical analysis was based on network calculus. An experimental setup, which accu-rately reflects an automotive communication network, was implemented in or-der to evaluate the theoretical model. The results obtained by the experiments provided valuable feed...

  10. How safe is safe?

    International Nuclear Information System (INIS)

    Hughes, C.F.; Flood, M.

    1996-01-01

    Full text: The Australian Register of Therapeutic Goods lists over 25,000 medical device types currently supplied to Australian consumers. It is widely assumed that all goods listed on this register have been fully evaluated for safety and efficacy by the Therapeutic Goods Administration. However, only 1,010 devices are registered and thereby subject to full premarket evaluation. Five classes of registerable devices were arbitrarily assigned in 1986 based on overseas experience (Canada and the USA) and the work of several Advisory Panels convened by the then Minister of Health, Dr Neal Blewett. Some products have been removed from registerable categories, while others have been added. These decisions were made after reviewing device performance and problems. In May 1987, the Therapeutic Device Evaluation Committee (TDEC) and the Therapeutic Goods Administration introduced the Australian Therapeutic Device Problem Reporting Scheme. Under this scheme, any interested person can report medical device related problems to the Department for investigation. Each problem is investigated, a cause and/or outcome assigned and appropriate action is taken. Analysis of problem reports received indicates that no regulatory action was necessary in 34% of investigations. However, 24% of products required product improvement and recalls and/or safety alerts were issued for approximately 10% of problems investigated. In only 5% was the problem not confirmed by departmental investigation. The actual effect of the problem reported was temporary or minor injury in 10% of patients. In 2%, death or serious injury resulted. Forty-four percent of problems did not lead to patient injury at all and in 44% the problem was not related to the patient and/or his well being. However, the potential effect of death or serious injury was present in 17% of device problems. In 26% of reported events, temporary or minor injury could have occurred. Specific device related problems include the Bjork Shiley

  11. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    CERN Document Server

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  12. Transition: the experiences of support workers caring for people with learning disabilities towards the end of life.

    Science.gov (United States)

    O'Sullivan, Gavan; Harding, Richard

    2017-06-01

    This research aims to provide a better understanding of the experience of support workers, as paid carers, caring for adults with learning disabilities (LDs) nearing the end of life in residential settings. In the past 100 years, people with LDs (also referred to as 'learning difficulty', 'mental retardation' and 'intellectual disability' internationally) are living longer with life expectancy approaching the population norm and more likely to die from diseases such as cancer, respiratory and vascular diseases. Community-based supported accommodation has become the foremost provider for people with LDs in their late 30 s or over in the UK. In the midst of the transition from living to dying for people with LDs, and even postdeath, the needs of support workers are often neglected against a background where most are unqualified, often with little experience of death and dying event, and with limited access to clinical supervision and education. 3 focus groups involving 13 support workers were conducted at 3 independent service provider settings for people with LDs in London. In recounting the experiences of these groups of support workers, 6 themes are described: strong emotional bond and identification; collaboration with other services; training issues around the extended role; support within the organisation; relationship with family/other residents; and grieving the 'loss'. Although support workers play a key role in meeting the end-of-life care needs of people with LDs in residential settings, their own needs are often neglected. There are still significant gaps in understanding these needs and practice development in this area. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  13. From safe yield to sustainable development of water resources - The Kansas experience

    Science.gov (United States)

    Sophocleous, M.

    2000-01-01

    This paper presents a synthesis of water sustainability issues from the hydrologic perspective. It shows that safe yield is a flawed concept and that sustainability is an idea that is broadly used but perhaps not well understood. In general, the sustainable yield of an aquifer must be considerably less than recharge if adequate amounts of water are to be available to sustain both the quantity and quality of streams, springs, wetlands, and ground-water-dependent ecosystems. To ensure sustainability, it is imperative that water limits be established based on hydrologic principles of mass balance. To establish water-use policies and planning horizons, the transition curves of aquifer systems from ground-water storage depletion to induced recharge of surface water need to be developed. Present-day numerical models are capable of generating such transition curves. Several idealized examples of aquifer systems show how this could be done. Because of the complexity of natural systems and the uncertainties in characterizing them, the current philosophy underlying sustainable management of water resources is based on the interconnected systems approach and on adaptive management. Examples of water-resources management from Kansas illustrate some of these concepts in a real-world setting. Some of the hallmarks of Kansas water management are the formation of local ground-water management districts, the adoption of minimum streamflow standards, the use of modified safe-yield policies in some districts, the implementation of integrated resource planning by the City of Wichita, and the subbasin water-resources management program in potential problem areas. These are all appropriate steps toward sustainable development. The Kansas examples show that local decision-making is the best way to fully account for local variability in water management. However, it is imperative that public education and involvement be encouraged, so that system complexities and constraints are better

  14. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  15. SAFE/SNAP application to shipboard security

    International Nuclear Information System (INIS)

    Grady, L.M.; Walker, J.L.; Polito, J.

    1981-11-01

    An application of the combined Safeguards Automated Facility Evaluation/Safeguards Network Analysis Procedure (SAFE/SNAP) modeling technique to a physical protection system (PPS) aboard a generic ship is described. This application was performed as an example of how the SAFE and SNAP techniques could be used. Estimates of probability of interruption and neutralization for the example shipboard PPS are provided by SAFE as well as an adversary scenario, which serves as input to SNAP. This adversary scenario is analyzed by SNAP through four cases which incorporate increasingly detailed security force tactics. Comparisons between the results of the SAFE and SNAP analyses are made and conclusions drawn on the validity of each technique. Feedback from SNAP to SAFE is described, and recommendations for upgrading the ship based on the results of the SAFE/SNAP application are also discussed

  16. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Topform '92: the safe and reliable operation of LWR NPPs. Vol. I

    International Nuclear Information System (INIS)

    1993-01-01

    The proceedings contain 23 invited plenary session papers. All have been inputted to INIS. The topics covered include safety principles, management and organization, operational training and simulation, inspection, maintenance and component replacement, backfitting experience, instrumentation, man-machine interface, software and procedures. (Z.S.)

  18. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of `As Low As Reasonably Achievable` would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  19. Rethinking priorities: experience of an educational initiative to change attitudes, behaviours and clinical practice in end-of-life care.

    Science.gov (United States)

    Edwards, Annette; Barros D'Sa, Viv; Hicks, Fiona

    2017-05-08

    To implement the National End of Life Care strategy and enable more people to express and achieve their preferences about care at the end of life, senior clinicians outside palliative medicine need to make it a routine part of their practice. However, it is acknowledged that recognising that people are entering the last phase of their illness is not always straightforward, and having conversations about aims of treatment and planning for future care may not be easy. In order to begin to address these challenges, funding was sought from the Yorkshire and the Humber Strategic Health Authority (SHA), and subsequently Health Education England, Yorkshire and the Humber (HEEYH), to pilot a development programme in 2 acute trusts. 2 palliative medicine consultants shared the trainer role at each site, supporting hospital consultants from a range of specialties, with a GP to give a community perspective. The programme involved individual clinicians identifying their own learning needs and specific issues for end-of-life care in their patients. The group met together monthly in action learning sets to discuss issues in a safe yet challenging environment. Following evaluation using a combination of training needs analyses, feedback questionnaires, audits and service evaluations, it was modified slightly and repiloted in 2 further trusts as 'Rethinking Priorities'. This paper describes the programme and its outcomes, especially in relation to participants' learning, service development and leadership. It also highlights the challenges, including different learning styles, the concept of action learning, obtaining funding and dedicated time, and how to evaluate the effectiveness of a programme. Overall, it suggests that an educational initiative based on clinicians identifying their own learning needs, and using an action learning approach to explore issues with other colleagues, with the addition of some targeted sessions, can result in positive change in knowledge, behaviour

  20. Carbon replacement and stability changes in short-term silvo-pastoralo experiments in Colombian Amazonia

    NARCIS (Netherlands)

    Mosquera Vidal, O.; Buurman, P.; Ramirez, B.L.; Amezquita, M.C.

    2012-01-01

    There is little information on the effects of land use change on soil Carbon stocks in Colombian Amazonia. Such information would be needed to assess the impact of this area on the global C cycle and the sustainability of agricultural systems that are replacing native forest. The aim of this study