WorldWideScience
 
 
1

Mechanical jacks meant to support the movable shielding wall (Proton Room side) of the SC  

CERN Document Server

This mechanical version was soon after changed into a hydraulic jack one (the reason being a number of serious constructional defects).

1955-01-01

2

Device for advancing the base of a stoping unit  

Energy Technology Data Exchange (ETDEWEB)

The purpose of the invention is to increase reliability in the operation of the device for advancing the base of a stoping unit. This is achieved because the device includes alternation hydraulic jacks of advance and control connected by hinges between themselves by the sections of the base and equipped with hydraulic locks, distributors of the hydraulic jacks of advance. In this case the hydraulic locks connected to the hydraulic jacks of control are doubled and connected to the distributors of the neighboring sections through reverse valves.

1980-12-13

3

UTK-EERC ~ Staff - Jack N. Barkenbus  

Wastenet

... Tschantz, Performance Evaluation of Constructed Urban Stormwater Detention Ponds in the Knoxville Area, proceedings and presentation to International Conference on Decision Making in Urban and Civil Engineering, Lyon, France, November 22, 2000. B.A. Tschanz, Current Problems, Practices, and ...

4

8:00am - Jack Marburger's Remarks to the Committee - NASA  

Science.gov (United States)

Aug 5, 2009 ... and the intelligence community as well. The subsequent process was carried ..... The source of this criticism ranges from concern over technical capability to .... universe with both human and robotic missions, and open ...

5

Shock absorber for the leg structure of offshore jack-up rig  

Energy Technology Data Exchange (ETDEWEB)

A shock absorber mechanism and method for use on the leg structure of a jack-up offshore drilling rig is described. It is mounted on the bottom of each existing leg of a drilling rig and comprises a pointed piston member which is positioned on the bottom of the leg structure and projects downwards through the can/footing of the rig leg. The piston member is held in place by a resilient tension member which is designed to absorb shock forces during vertical/axial impact of the leg structure when contact is made with the ocean floor. (author).

1992-02-19

6

New drilling rigs  

Energy Technology Data Exchange (ETDEWEB)

Friede and Goldman Ltd. of New Orleans, Louisiana has a successful drilling rig, the L-780 jack-up series. The triangular-shaped drilling vessel measures 180 x 176 ft. and is equipped with three 352 ft legs including spud cans. It is designed to work in up to 250 ft waters and drill to 20,000 ft depths. The unit is scheduled to begin initial drilling operations in the Gulf of Mexico for Arco. Design features are included for the unit. Davie Shipbuilding Ltd. has entered the Mexican offshore market with the signing of a $40,000,000 Canadian contract for a jack-up to work in 300 ft water depths. Baker Marine Corporation has contracted with the People's Republic of China for construction of two self-elevating jack-ups. The units will be built for Magnum Marine, headquartered in Houston. Details for the two rigs are given. Santa Fe International Corporation has ordered a new jack-up rig to work ...

1981-02-01

7

Foundations  

Energy Technology Data Exchange (ETDEWEB)

This Health and Safety (HSE) document offers technical information on the design of foundations for supports in offshore installations, and relates particularly to the North Sea. It is based largely on guidance offered earlier in Section 20 of the Fourth Edition of the Health and Safety Executive's 'Offshore Installations; Guidance on Design, Construction and Certification', which was withdrawn in 1998. The document contains a general section on foundations and the rest of the document comprises sections on: (a) piled foundations (planning, problems, pile make-up, steel stresses, design of pile foundations, axial pile capacity, factors of safety for piled foundations, load-deflection of piles, and piles for tethered buoyant structures); (b) foundations for gravity structures (foundation types, loads and reactions during installation, operating loads and reactions, foundation problems, cyclic load failure, factors of safety, foundation response and performance ...

2002-07-01

8

Offshore hydraulics: tough, reliable, and failsafe  

Energy Technology Data Exchange (ETDEWEB)

The Offshore Comet is a modern offshore drilling rig with a hydraulic-cylinder-actuated jacking (raising and lowering) system. Hydraulic-cylinder jacking provides a safe and efficient method for placing the rig at the desired height above the water and insuring that it can withstand the expected heavy loads imposed by machinery, supplies, and the ocean environment. The drilling rig consists of a steel-hulled barge that is floated to the site and then supported during drilling operations by four steel triangular-cross-section lattice legs. The legs are planted firmly on the ocean bottom by a procedure called preloading. Each leg with its integral footing weighs 657 tons. The barge with its deck load can weigh up to 9200 tons.

1983-08-01

9

Innovative production system goes in off Ivory Coast  

Energy Technology Data Exchange (ETDEWEB)

The phased field development of the Lion and Panthere fields, offshore the Ivory Coast, includes a small floating production, storage, and offloading (FPSO) tanker with minimal processing capability as an early oil production system (EPS). For the long-term production scheme, the FPSO will be replaced by a converted jack up mobile offshore production system (MOPS) with full process equipment. The development also includes guyed-caisson well platforms, pipeline export for natural gas to fuel an onshore power plant, and a floating storage and offloading (FSO) tanker for oil export. Pipeline export for oil is a future possibility. This array of innovative strategies and techniques seldom has been brought together in a single project. The paper describes the development plan, early oil, jack up MOPS, and transport and installation.

1995-07-17

10

MAGIC Telescope observations of high energy gamma-rays from globular cluster M13  

Energy Technology Data Exchange (ETDEWEB)

Globular clusters are quite compact (size {proportional_to}10 pc) objects distributed spherically around the galaxy. They contain about 10{sup 5}-10{sup 6} mostly old stars. The number of millisecond pulsars in typical globular cluster is expected to be large (of the order of 100). We investigate the possible mechanism of production of high energy gamma-rays in those objects. Part of the wind energy of pulsars (energy conversion factor) is converted into relativistic leptons. Those leptons can upscatter in inverse Compton process low energy starlight and CMB photons and produce gamma-rays. MAGIC is an Imaging Atmospheric Cerenkov Telescopes located at Canary island of La Palma. We present results and discussion of the MAGIC observations of globular cluster M13.

2008-07-01

11

Transversal bearing device for a nuclear reactor component, transversal bearing device for a PWR steam generator and its adjusting process  

International Nuclear Information System (INIS)

The lateral bearing device is made of 7 lateral supports, each positioned to allow the displacement of the steam generator due to thermal or seismic effects. Each support includes a buffer plate that can be positioned on the steam generator using a position control assembly. This control assembly consists of a screw jack arrangement where the nut is fastened via an energy absorbing layer to a footplate that is fixed to the concrete wall of the steam generator enclosure. 4 figs.

1992-03-31

12

Internal stresses analysis in telectroformed nickel shells for thermoplastics injection mold core (rapid tooling); Analisis de las tensiones internas en las cascaras de niquel electroconformadas que se utilizan como inserto de un molde de inyeccion de termoplasticos (rapid tooling)  

Energy Technology Data Exchange (ETDEWEB)

This study deals with a research field started at the LFI (Laboratorio de Fabricacion Integrada) of the ULPGC (Universidad de Las Palmas de Gran Canaria). Its aim is to analyse and propose improvements in the electroformed nickel cores manufacture. The main application of these cores is to be used as plastic injection molds. It has been considered an important part of this study taking under consideration internal stresses that appear in the nickel electroformed core. These stresses play a determinant role towards reaching a dimensional and resistant quality standard of the shells, which will be later transformed into cores. The investigation includes not only a theoretic study but also an experimental one. the testing method has the remarkable advantage of a wide industrial application because of its simplicity, low cost and reproducibility of the electrolytic bath actual conditions. (Author) 7 refs.

2005-07-01

13

Transversal bearing device for a nuclear reactor component, transversal bearing device for a PWR steam generator and its adjusting process. Dispositif de maintien transversal d'un composant d'un reacteur nucleaire, ensemble de maintien transversal d'un generateur de vapeur d'un reacteur nucleaire a eau sous pression et son procede de reglage  

Energy Technology Data Exchange (ETDEWEB)

The lateral bearing device is made of 7 lateral supports, each positioned to allow the displacement of the steam generator due to thermal or seismic effects. Each support includes a buffer plate that can be positioned on the steam generator using a position control assembly. This control assembly consists of a screw jack arrangement where the nut is fastened via an energy absorbing layer to a footplate that is fixed to the concrete wall of the steam generator enclosure. 4 figs.

1993-10-01

14

Study on a transportation and emplacement system of pre-assembled EBS module for HLW geological disposal  

International Nuclear Information System (INIS)

HLW disposal is one of the largest issue to utilize Nuclear power safely. In the past study, the concept, which buffer materials and Overpacked waste were transported into underground respectively, have shown. The concept of pre-assembled engineered barrier has advantage to simplify the logistics and emplacement procedure, however there are difficulties to support heavy weight of pre-assembled package by equipment under the condition of little clearance between tunnel and package. In this study, Combination of air bearing and two degree-of-freedom wheels were suggested for transportation, and air jack was suggested for unloading and emplacement system. Also, whole system for transportation and emplacement procedure was designed, and Scale model test was examined to evaluate the feasibility of these concept and functions. (author)

2009-11-01

15

Assessment of the efficiency of short term countermeasures following a severe accident on a PWR  

Energy Technology Data Exchange (ETDEWEB)

In case of a severe nuclear accident at a PWR plant, countermeasures will be initiated in the short term by authorities to reduce the consequences of the atmospheric radioactive releases on the neighbouring population. Various factors influence the level of protection afforded by countermeasures. For instance, a too late intervention would lead to a Jack of efficiency in terms of dose reduction if the actual evolution of the accident is not considered. Thus, implementation of countermeasures should be optimized. In general, the projected doses (those without countermeasure) are compared with those expected when a particular countermeasure or strategy is implemented. In this paper, an in-depth analysis associates the kinetics of the release with the corresponding evolution of the dosimetric efficiency of countermeasures. This is done at different times in the short term of the accident and for various distances from the plant. Results are presented for different ...

2001-07-01

16

Amazon.com: Chicken Soup for the Soul: Power Moms - 101 Stories Celebrating the Power of Choice for Stay-at-Home and Work-from-Home Moms (97819350963  

Wastenet

...com: Chicken Soup for the Soul: Power Moms - 101 Stories Celebrating the Power of Choice for Stay-at-Home and Work-from-Home Moms (9781935096313)...com: Chicken Soup for the Soul: Power Moms - 101 Stories Celebrating the Power of Choice for Stay-at-Home and Work-from-Home Moms (9781935096313)...Victor Hansen, Wendy Walker: Books Jack Canfield, Mark Victor Hansen, Wendy Walker,Chicken Soup for the Soul: Power Moms - 101 Stories Celebrating ...the Power of Choice for Stay-at-Home and Work- from-Home Moms,Chicken Soup for the Soul,1935096311,I9781935096313,Child Care/Parenting,Employment,Literary collections,Motherhood,...

17

HPLC-APCI-MS analysis of triacylglycerols (TAGs) in historical pharmaceutical ointments from the eighteenth century.  

Science.gov (United States)

The lipid fractions of residues from historical pharmaceutical ointments were analysed by reversed-phase liquid chromatography coupled with atmospheric pressure chemical ionization and mass spectrometer detection. The residues were contained in a series of historical apothecary jars, dating from the eighteenth century and conserved at the "Aboca Museum" in Sansepolcro (Arezzo, Italy) and at the pharmacy of the "Real Cartuja de Valldemossa" in Palma de Majorca (Spain). The analytical protocol was set up using a comparative study based on the evaluation of triacylglycerol (TAG) compositions in raw natural lipid materials and in laboratory-reproduced ointments. These ointments were prepared following pharmaceutical recipes reported in historical treatises and used as reference materials. The reference materials were also subjected to stress treatments in order to evaluate the modification occurring in the TAG profiles as an effect of ageing. TAGs were successfully ...

2011-06-29

18

Report two. Safety offshore eastern Canada. Summary of studies and seminars  

Energy Technology Data Exchange (ETDEWEB)

In 1982 the semi-submersible drilling unit Ocean Ranger capsized and sank off the Grand Banks, resulting in the loss of the entire 84-man crew. A Royal Commission was set up to conduct an enquiry into the incident, and to carry out a process of research and opinion-gathering towards providing recommendations to both federal and Newfoundland governments. The primary purpose of the Commission was to determine why the Ocean Ranger sank, why none of the crew were saved, and how to avoid similar disasters. A number of studies and seminars were held to focus expert knowledge and opinion in several key fields and to update studies and fill gaps in the data base. Summaries of selected study reports and the seminar proceedings are presented in the following areas: the environment, including ice, marine climatology, weather forecasting services, wave climatology, oceanographic information, and seabed information; design, including mobile offshore drilling rig design evolution, continuity from ...

1984-05-01

19

Linear chain tensioning of moored production vessels  

Energy Technology Data Exchange (ETDEWEB)

As need for development of marginal and deepwater oil fields grows, demand increases for floating production vessels (FPVs) such as floating production, storage and offloading (FPSO) units; spread-moored production semi-submersibles; and turret-moored production vessels. The FPV may be purpose-built; or an existing vessel such as an exploration drilling semi-sub or ship-shape vessel may be modified to suit the purpose. In either case, requirements for tensioning systems for the mooring lines on the FPV are quite unique, and are not without the potential for problems when traditional chain windlasses or wire rope systems are employed. This two-part article discusses the range of available technologies and systems for tensioning mooring lines on FPVs. It examines problems of size, weight and safety associated with some available designs; and it considers in detail a specific family of new units. Part 1, presented here, discusses the FPV market, worldwide potential locations and different ...

1993-04-01

20

Petroleum potential of western Newfoundland's Cambro-Ordovician succession  

Energy Technology Data Exchange (ETDEWEB)

The Cambro-Ordovician platform was formed along the margin of the old super-continent of Laurentia approximately 470 million years ago, and is a prolific producer of hydrocarbons. This presentation provided a geological review of the region as well as estimates of the amounts of oil in place. A simplified geological cross-section of the formation was presented, as well as a chart of the Anticosti Basin of western Newfoundland. Details of exploration wells targeting the Cambro-Ordovician carbonate platform and current west coast land holdings were provided. An outline of the area's petroleum system included details of source rock, reservoirs, traps and seals and migration and timing. Offshore prospects for the platform were estimated to be in the region of 100 to 200 million barrels. Onshore prospects were estimated to be in the region of 30 million to 150 million barrels. It was noted that limited coverage by onshore seismic data may mean that larger structures have yet to be ...

2006-07-01

 
 
 
 
21

Natural gas in Lake Erie: a reconnaissance survey of discharges from an offshore drilling rig  

Energy Technology Data Exchange (ETDEWEB)

Field studies were conducted May 28-June 1, 1979, to determine the chemical composition and physical behavior of discharges from an offshore gas drilling rig in the central basin of Lake Erie. The drilling operation was observed for four days, from rig jackup to the circulation of mud through the borehole after drilling had been completed. Resuspension studies using nephelometry, supplemented with chemical analyses, indicated little resuspension of lake bottom materials or release of metals to the water column during rig jack-up. Portions of the turbidity plumes generated during drilling were buoyant. Three surface turbidity plumes were mapped with nephelometry to a point at which particulate concentrations reached background levels in the Lake. Detectable plumes were approx. 400 to 1500 m in length and had maximum widths < 230 m. A chemical survey conducted in the plume during early gas shows indicated that discharged inorganic chemical species were rapidly ...

1980-10-01

22

Design and construction of 125,000kl industrial water tank foundations for Tachibanawan power plant. Deformation in large pile foundations on inclined rockbed and evaluation thereof; Tachibanawan hatsudensho 125,000 kl kogyoyosui tank kiso no sekkei to seko. Keisha kiso ganbanjo no ogata kui kiso no henkei tokusei to hyoka  

Energy Technology Data Exchange (ETDEWEB)

The two tank (125,000kl each) foundations under construction are as large as 85m in diameter, and the north-side tank is to be placed over a sharper slope. The tanks are greatly different in their height from the rockbed since they are to be placed at the same level. For reduction in construction cost and time, a pile foundation design is chosen as the basic concept for foundation construction. After an overall evaluation of stability upon exposure to seismic torsion and of the deformation characteristics of piles and concrete slabs, a total pile foundation design with rock debris replaced with crushed rock is determined to be the design to be adopted. Since the piles to be driven in are greatly different in length, error in the pile supporting force will be too grave under the conventional pile landing control system. Therefore, a high-accuracy pile landing control system is employed, established after a rapid load test in addition to the dynamic load test for the confirmation of the ...

1998-09-05