ContextCost advantage has been one of the primary drivers of successful offshoring engagements of Indian software and services companies. However, the emphasis has shifted to the ability of the vendors to provide high quality over cost advantage in delivering software products and services. Meeting high quality requirements of the clients is a challenge due to the very nature of development and delivery of software through offshoring. ObjectiveThe objective of this research paper is to identify and evaluate the key determinants of quality in the case of software projects delivered through offshoring model. MethodA detailed survey was conducted among project managers/project leaders (leads) of a leading midsize Indian IT services company to evaluate the relationship of the determinants on t...
Recessive mutations of the early phase change (epc) gene in maize affect several aspects of plant development. These mutations were identified initially because of...Full Text Available
Oil and gas resources in the offshore areas of the US constitute a significant portion of US recoverable hydrocarbon resources. The exploration, development and production of these offshore resources in California, however, could have significant air quality implications for coastal air basins. This study was developed to address a problem that frequently arises with offshore air quality assessments. Typically, such assessments are performed for a specific activity scenario (e.g., a Federal OCS Lease Sale involving a projected number of drilling rigs, platforms, pipelines, etc.) and assume a projected (but uncertain) level of recoverable oil and gas resources. This study enables interested parties to estimate air emissions and impacts for a wide range of OCS-related development scenarios. The modular emission calculation procedure and the generic impact assessment provide for ...
A shock absorber mechanism and method for use on the leg structure of a jack-up offshore drilling rig is described. It is mounted on the bottom of each existing leg of a drilling rig and comprises a pointed piston member which is positioned on the bottom of the leg structure and projects downwards through the can/footing of the rig leg. The piston member is held in place by a resilient tension member which is designed to absorb shock forces during vertical/axial impact of the leg structure when contact is made with the ocean floor. (author).
Procedures followed in designing for offshore production rigs in the Northeastern Areas of the Campos Basin are presented. Various advantages afforded by the mast in the performance of required tasks are analyzed, along with all calculation premises and methods for adequate sizing. Standards covering mast design, materials used in manufacture, and test routines are also examined. (author). 16 figs., 3 tabs., 11 refs
The Mittelplate oilfield is located in the Waddensea tidelands 8 km off the north sea coast and represents Germany's largest oilfield. Since Mittelplate oil production has started in 1987, RWE Dea AG being the operator in a 50/50 joint venture with Wintershall AG, has continually implemented and improved the sophisticated technology required to exploit natural resources by using safe and environmentally compatible means in the sensitive tideland environment of Mittelplate. Besides the sucessful offshore operations from the man-made Mittelplate Drilling and Production Island, further onshore development has started in 2000 by producing from high-tech ERD wells drilled from onshore locations. The offshore oil production had been transported so far by specially designed tug and tow barges and had been restricted by weather and tide. To overcome this bottleneck and to enable an accelerated offshore drilling and ...
The Hebron offshore drilling project in Atlantic Canada was discontinued in 2002 due to economic challenges. Chevron-Texaco has conducted small-scale studies to find ways to improve the project's viability. One of the main challenges facing this offshore drilling project is the issue of iceberg scour and its effect on seafloor equipment. This paper demonstrates how advances in ice engineering have resulted in new and cost-effective development concepts for: central gravity base structures; wellhead gravity base structures; floating production, storage and offloading (FPSO) subsea facilities; and, long subsea tieback and trench optimization. New studies have provided a better understanding of ice contact pressures, drift velocities, iceberg management and interaction processes. New designs for gravity base structures can reduce wave loads. The selection of a new development ...
The state of exploration in the Terra Nova field offshore Newfoundland, and the progress in constructing the floating production, storage and offloading (FPSO) at Bull Arm, the assembly site west of St. John's for the Terra Nova vessel, are described. Comparisons are made between the excitement created by the first production well at Leduc in Western Canada in 1947, and the offshore developments currently underway and accelerating offshore Newfoundland. It is estimated that exploration and development offshore had barely touched the surface, with only 160 wells of all types drilled to date, of which 48 exploration wells have uncovered 1.7 billion barrels of oil. The area is practically unexplored; the source rock is there, and the current estimate is that there are a number of basins in the offshore area that are several times the size of the Jeanne d'Arc Basin, ...
CETCO Oilfield Services, suppliers of environmental systems, have undertaken a project to treat contaminated water returns on a Floating, Production, Storage and Offloading (FPSO) facility in the North Sea. The solution sees fluids treated during oil well clean-up operations, reducing the potential for overboard oil discharges, and resulting production upsets.
In 1994, after four years of preparation, the first off-shore wind farm in the Netherlands was erected. The ``Lely`` wind farm comprises four NedWind 500 kW wind turbines, of rotor diameter 40.77 m. The turbines are placed on unique single-pile foundations. An interesting engineering aspect of the project is the interaction between the foundations and the turbine. (author)
Before expanding on the development of the Terra Nova oilfield, the author discussed the overall business strategy of Petro-Canada and identified where the Terra Nova and offshore Newfoundland oil have their place within this strategy. The principal basins and oilfields offshore Newfoundland were reviewed, then the emphasis shifted to rest on the Terra Nova development project. A whole range of topics were brought up, including the Floating Production, Storage and Offloading (FPSO) facility, the modules layout, the FPSO located at Bull Arm, and the floating production systems. The physical environment of the Grand Banks was highlighted, and the next few sections were devoted to the Terra Nova FPSO, FPSO and drill centres, the Turret General Arrangement, and Spider buoy including the disconnect/reconnect. The last four sections dealt with the animation of riser movement, the wellhead protection animation, Henry Goodrich, and ...
The phased field development of the Lion and Panthere fields, offshore the Ivory Coast, includes a small floating production, storage, and offloading (FPSO) tanker with minimal processing capability as an early oil production system (EPS). For the long-term production scheme, the FPSO will be replaced by a converted jack up mobile offshore production system (MOPS) with full process equipment. The development also includes guyed-caisson well platforms, pipeline export for natural gas to fuel an onshore power plant, and a floating storage and offloading (FSO) tanker for oil export. Pipeline export for oil is a future possibility. This array of innovative strategies and techniques seldom has been brought together in a single project. The paper describes the development plan, early oil, jack up MOPS, and transport and installation.
Foinaven and Schiehallion/Loyal are the first oilfields West of Shetland (WoS). They were developed using Floating Production, Storage and Offloading (FPSO) technology in water depths of between 350m and 550m and arguably the harshest environmental conditions yet experienced offshore. Traditional project time scales were halved by shortening and overlapping the reservoir and facilities developments. This paper describes some of the challenges faced by the geotechnical engineers working on these projects and summarises lessons learnt from site investigations and the design and installation of foundations. (author)
As a result of a lower value of the energy efficiency coefficient (EPC) for houses and the implementation of the Energy Performance Building Directive (EPBD), both in 2006, the interest in applying renewable energy systems is growing. Therefore, this issue is dedicated to renewable energy and related energy systems. [Dutch] Het begrip 'duurzaam' is van toepassing op twee pijlers: een pijler betreft het gebruik van duurzame materialen, de tweede pijler is duurzame energie. Door verlaging van de Energieprestatiecoefficient (EPC) voor woningen per 2006 en de invoering van de Europese richtlijn Energy Performance Building Directive (EPBD) in 2006, krijgt duurzame energie een nieuwe impuls. Reden voor de redactie van ThemaTech om deze aflevering te wijden aan duurzame energie en verwante ystemen.
Husky Oil Operations Ltd (Husky) is considering the development of the South White Rose Expansion (SWRX) area, located approximately 4 km south of the current Southern Glory Hole (SGH) in approximately 120 m of water. Within the new glory hole, one new drill centre will be constructed with wells tied back and into the SGH manifolds. The SWRX drill centre will comprise three horizontal production wells and two horizontal water injection wells with expansion capacity for eight wells. Husky is intending to submit a Development Plan Amendment to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) as part of the development. This document presented the results of a study that assessed the potential impact of the new development on existing White Rose safety studies. The study reviewed existing safety studies that were developed for the White Rose project to determine the potential impact of the new SWRX development. These studies ...
The development of the Aasgard field complex off mid Norway represents one of the largest technical and economic challenges yet faced by the Norwegian offshore industry. The article deals briefly with this development. The project comprises a floating production, storage and offloading (FPSO) vessel for the oil production, and a large semisubmersible for the gas phase. More than 60 subsea completed wells for production and injection on 15 seabed templates are planned, with some 300 km of seabed pipelines also to be installed on the field which will produce for 30 years. The total investment will be NOK 31 billion. 1 fig.
The Northeast Gateway Energy Bridge Deepwater Port project was commissioned in 2005 and is based on a proprietary energy bridge shipboard regasification technology. The offshore liquefied natural gas (LNG) facility will be located in federal waters 13 miles southeast of Gloucester and was designed to cope with the extreme weather of the Massachusetts Bay. A dual-buoy system will be capable of ensuring continuous delivery of natural gas. Throughput capacity will range from 400 to over 800 MMcf/d. Vessels used at the port have capacities of 138,000 m{sup 3} and 150,900 m{sup 3} with peak sendout rates of 600 MMcf/d. The vessels have the capacity to rapidly increase and decrease their delivery rates. During periods of peak demand, 2 vessels can be simultaneously accommodated at the port, which has been designed to accommodate larger vessels to maximize future throughput. This presentation presented details of the port's design phases and ...
Canada's offshore Atlantic petroleum industry is celebrating its tenth anniversary in 2001. This article chronicles the development of the industry discussing the many challenges and setbacks and the eventual triumphs that accompanied the industry's development over the years. Highlights discussed include shipping first oil from the Cohasset Field in July 1992; the financial crisis caused by the withdrawal of Gulf Oil from the Hibernia consortium in the same year; new funding and the beginning of the gravity-based structure construction at Bulls Arm in 1993; striking oil in the Hibernia Field in 1994; the start of exploration and development of the Terra Nova field by Petro-Canada in the same year, based on the floating production, storage and offloading (FPSO) system, which heralded a new era of offshore development in eastern Canada. Approval by the Nova Scotia government of the third and final phase of the Sable ...
The White Rose Oil Project, located in the Jeanne d'Arc Basin 350 km east of St. John's, is reported to continue paying benefits for the oil and gas industry in eastern Canada. The operator, Husky Energy, is said to be on target and expects first oil from the project in late 2005 or early 2006. Peak production for the White Rose Field is projected at 100,000 bbl/d. The project has a total capital cost of $2.35 billion. The first phase of the project, comprised of four wells, including an oil producer, was completed in July. The estimated productive capacity of this well is between 25,000 and 35,000 bbl/d. Other major milestones achieved at the White Rose project include movement of the topside modules onto the Sea Rose floating production, storage and offloading (FPSO) vessel, consisting of 17 lifts during the seven-week program. Individual ...
A project on the title is a special study of TRC (Technology Research Center) Japan National Oil Corporation, which aims at developing a system collecting many data near well bottom while drilling. The project is a 3-year project from 1993 to 1995 succeeding to results of a project on real-time drilling control technology which was finished in fiscal 1992. This paper is a record in fiscal 1993. In 1993, the first year, TRC starts a joint study with relational enterprises aiming at utilizing an EM-MWD (electromagnetic-measurement while drilling) system practically. Based on the past fruit of the study, the EM-MWD system was applied to an highly inclined well or a horizontal well. A total system was constructed, which improved electromagnetic radiation transmission efficiency, and reliability, and workability. An electromagnetic radiation receiver system for an offshore drilling rig ...
This bibliography deals with the foundation of offshore structures like drilling or working platforms (oil and gas exploitation) or offshore tanks. Different kinds of foundations, e.g. pile foundations or shallow foundations, are described. Aspects of soil-structure interaction, engineering geology and soil mechanics are also discussed. (orig.).
A discussion covers the LOOP project to construct an offshore pipeline system, which will connect with onshore facilities at Fourchon, La., and two onshore pipelines (26 mi 48 in. Clovelly line and 53 mi 48 in. LOCAP line) connecting Fourchon with the existing Capline system at St. James, La.; the three-phase construction schedule, the first phase due to begin in the third quarter of 1978 with, e.g., onshore pipeline and salt dome storage facility construction which will yield an expected initial throughput of 1.4 million bbl/day; the marine terminal complex, consisting of control and pumping platforms, and three 7000 hp pumps to operate the system at 45,000-100,000 bbl/hr; the offshore lines, including lines between single-point mooring units and the pumping platform, the 21 mi 48 in. pipe to Fourchon, and corrosion protection of lines by an asphalt-sand mixture or a semiplasticized coal-tar enamel; the onshore system, ...
The main businesses of the Aker Group were outlined. The Aker Group has an operating revenue of 51.7 billion with operational experience in deepwater floaters, subsea infrastructure, onshore oil and gas plants, fixed offshore platforms, petrochemical refining, power generation, pulping, and mining. The company plans and executes capital projects, provides technology solutions and life-cycle operations, service and maintenance. The Aker Group owns 50 per cent of the Aker Kvaener offshore drilling rig located in the North Sea. This presentation outlined the challenges of working in a harsh environment. The area is characterized by a short productive season, low temperatures and limited sunlight. The direct environmental issues include spills and the impact of oil and gas infrastructure. Indirect issues include lowering the entry barriers for other kinds of resource exploitation. Other challenges of field development in Arctic ...
There is a clear incentive, therefore, for early consideration of the measures required to meet noise and vibration standards. The platform or rig owner and the operator are jointly responsible for agreeing a noise and vibration control policy and approach at the conceptual design stage, and for then passing on their requirements to the engineering design teams. The engineering design teams and acoustic and vibration specialists for their part need to use all their skill and judgement to apply that policy to the intensely complex job of designing and fabricating topsides facilities. With these concerns as background, UEG started, and has nearly completed, a two-phase study to provide detailed guidance to project managers and designers to assist them to develop appropriate policy and procedures and to help them put those procedures into practice. This paper describes the development of UEG's study, its application and benefits.
This paper reports that more than 800 miles of pipeline will come into service on the U.K. continental shelf during 1993, surpassing by 75% the previous record set in 1977. About 3,500 miles of pipeline is in place. Commissioning of the Miller natural gas pipeline and Scottish Area Gas Evacuation (SAGE) network this year and start-up of the Central Area Transmission System (CATS) next year will bring more than 600 miles of pipeline into use during 1993. The projects are part of a recent development boom in the central North Sea. In a review of U.K. offshore pipeline, analyst County Natwest Woodmac reported that projects totaling about 1,250 miles of pipeline have been sanctioned but are not yet operating. Two thirds of this total is gas pipeline, while 60s made up of main lines from shore to platform. County Natwest says that in most cases spur lines will be used to connect new fields with existing infrastructure. The ...
A brief overview is given of the developments in the Dutch offshore industry where new offshore sites appear to be retrofitted or recycled platforms and contractors take over the work from petroleum companies (e.g. as so-called Floating Production Storage Offloading or FPSO). It is expected that in ten years from now a large number of oil platforms will be disappeared or transported to the Chinese Bohai Sea where a new oil field will be explored.
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
This book discusses problems and topics important for the design and construction of fixed offshore platforms used for drilling and producing petroleum from beneath the sea. A general description of offshore platforms serves as an introduction to the whole problem of offshore structures. A chapter on the hydrodynamic analysis of fixed offshore platforms gives the basis for the layout and construction of such structures. A guide to soil investigation methods essential for the geotechnical analysis of foundation designs for all types of offshore structures concentrates on the instrumentation equipment actually used. Detailed information is given on pile foundations with special emphasis on steel jacket platforms. The behaviour of gravity platforms during the final construction stage is analysed. The basis for the design of subsea pipelines and their stability is treated as well as the ...
This spring, Newfoundland will send off a floating production, storage and offloading (FPSO) vessel to the offshore Terra Nova field. The Terra Nova will proceed southeast through Bull Arm, then northeast out of Trinity Bay, then heads southeast to the Jeanne d'Arc Basin on the Grand Banks. The Terra Nova is expected to produce 115,000 barrels of oil per day for six years, when it reaches full capacity. The consortium, headed by Petro-Canada as senior ownership partner and operator, built an environment protection program into every aspect of the project. Some of the features of the environment protection program include glory holes excavated on the ocean floor for the protection of production equipment from icebergs, to a flare stack on the platform, which has four legs to provide stability in rough seas. The FPSO was designed to withstand sea ice, icebergs, and severe winter storms. Flow lines are also protected, and in the event ...
Canadian oilfields are a prime breeding ground for talent, technology and industrial management. This paper described how Canadian talent was recognized in 2001 for three major projects which included a cold-ocean production platform in the Sea of Okhotsk in Siberia, a mountain pipeline project in South America, and an in-situ underground extraction technology in the oilsands of Alberta. The cold-ocean production platform project was recruited by Sakhalin Energy Investment Co., an international consortium originally led by Marathon Oil Co which is now led by Royal Dutch Shell. The oil production platform is stationed 16 kilometres offshore of Sakhalin Island in the Sea of Okhotsk. Sakhalin Energy bought and converted the Molikpaq, an innovative platform made in the 1980s for the Beaufort Sea by Gulf Canada Resources Ltd. The second project included Calgary's Hydroconsult ...
More details about the construction of the Terra Nova floating production, storage and offloading (FPSO) vessel are provided. The vessel was built in the Daewoo shipyard in South Korea, and is now undergoing final fitting at Bull Arm, near St. John's, Newfoundland. When complete, the vessel will operate 350 km offshore, southeast of St. John's. It is 291 metres long and 45.5 metres wide and has a capacity of 960,000 barrels of oil. Although the FPSO will hold less than half of the last giant supertanker which sailed for Irving Oil, it has a crew of 81, four times the size of the supertanker, reflecting the technical uniqueness of the vessel and the intense pre-occupation with safety associated with the combination of winds, ice, waves, and shallow water around the Grand Banks. Also described is the alliance system of partnership between the oil companies and the main contractors. The deal stipulates that if the project ran ...
The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FG26-01BC15336 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under another grant because funding resources have been exhausted under The scope of work objectives for the eight projects covered under this grant is as follows: (1) Improve uniformity within state oil and gas data management efforts. (2) Conduct environmental compliance workshops and related educational projects on natural gas and oil exploration and production. (3) Improve regulatory ...
In August 1989, representatives from the Alberta Oil Sands Technology and Research Authority (AOSTRA) were the guests of the USSR Interbranch Scientific Technological Complex, Oil Recovery Institute (MNTK) in an extensive visit to heavy oil and gas fields and to various research institutes. Observations made during this tour concerning developments in the USSR heavy oil/bitumen industry, enhanced oil recovery, research programs, proposals for joint ventures, and technological developments are reported. It is noted that oil production in the USSR seems to have peaked and is in a state of decline, indicating the vital importance of enhanced recovery projects in reversing this trend. The areas visited included the Yarega field, where underground thermal recovery methods are used; the Sakhalin Island area, where successful thermal methods are used and where the USSR's largest offshore drilling rig is located; the Krasnodar/Black Sea area, ...
Husky Oil received approval from the government to begin development of its White Rose properties located in the Jean d'Arc Basin, 350 km east of St. John's, offshore Newfoundland and Labrador. First oil is expected by the end of 2005. The South Avalon Pool was discovered in 1988 and is estimated to contain approximately 200-250 million barrels of oil. Husky Oil and Petro-Canada filed a development application with the Canada-Newfoundland Offshore Petroleum Board in January 2001. Approval of the $2.35 billion project was received in December 2001. The development plan is based on a newly-built floating production, storage and offloading (FPSO) vessel. Initial development will focus on the South Avalon Pool that has been tested in excess of 5,000 barrels per day. The pool will be developed using eight production wells, 11 water injection wells and two gas injection wells. An estimated 150 million cubic feet ...
...Heinz Dahl: presenting offshore wind energy for Australia NexTgen Wind. Next month, Heinz L Dahl will speak about offshore wind energy and its prospects for Australia. Skip to the navigation. Skip to the content. Events Models Movements Opinion Policies Research SCRT Videos Seeking ... August guest speaker: Heinz Dahl, managing director, NexTgen Wind. Next month, Heinz L Dahl will speak about offshore wind energy and its prospects for Australia. Heinz is the managing director of NexTgen Wind, a leading edge company that is focused on the cost ...
This book presents the papers given at a conference on offshore platforms. Topics considered in this book include risk assessment, crack propagation, fracture control, stress corrosion, the reliability of pile foundations, the thermal conductivity of offshore pipeline coating material, economic analysis, hydrodynamics, simulation, Arctic structure design, composite materials, buoys, deep water drilling, corrosion protection, pollution control equipment, and subsea exhaust gas compressors.
The EPA proposed effluent limitations guidelines and standards for the offshore segment of the oil and gas industry on August 26, 1985. On November 26, 1990, and March 13, 1991, the Agency reproposed effluent limitations guidelines and standards for both drilling and production wastes. The report is primarily concerned with the total annualized cost incurred by the offshore oil and gas industry in complying with the regulations.
A description of LOOP covers the single point mooring (SPM) system; the offshore pipelines connecting each SPM to the pumping platform; the offshore platform complex, a pumping platform and a control platform; the onshore pipelines; and the Clovelly Dome storage terminal.
Beyond a great number of applications in mineral process, the hydrocyclone separation has been used recently in an increasing number of fields, such as: environmental engineering, petrochemical engineering, food engineering, electrochemical engineering, pulp bioengineering, processes and paper industries, among others. Nowadays, the produced water is treated and then reinjected in the surface and also in return to the formation. In the offshore platforms, the produced water can be directly discarded in the ocean, since the dispersed phase concentration (oil) is according to Brazilian regulating agency limits. The basic principle used in hydrocyclone separation is the centrifugal sedimentation machine: the suspended particles are submitted to centrifugal acceleration, which separates them from the fluid. The basic geometry of a hydrocyclone consists of four parts: a cylindrical section for feeding, a conical section for swirling, an overflow and an under flow. The ...
The proceedings include the following lectures: Facing the challenges - new structures for electricity production. Renewable energies in Europe - chances and challenges. Nuclear outlook in the UK. Sustainable energy for Europe. Requirements of the market and the grid operator at the electricity production companies. Perspectives for the future energy production. Pumped storage plants - status and perspectives. Nuclear power/renewable energies -partners or opponents? New fossil fired power stations in Europe - status and perspectives. Nuclear energy: outlook for new build and lifetime extension in Europe. Biomass in the future European energy market - experiences for dong energy. Meeting the EU 20:20 renewable energy targets: the offshore challenges. DESERTEC: sustainable electricity for Europe, Middle East and North Africa. New power plants in Europe - a challenge for project and quality management. Consideration of safely in new build ...
The performance of more than 3,000 offshore platforms in the Gulf of Mexico was observed during the passage of Hurricane Andrew in August 1992. This event provided an opportunity to test the procedures used for platform analysis and design. A global bias was inferred for overall platform capacity and loads in the Andrew Joint Industry Project (JIP) Phase 1. It was predicted that the pile foundations of several platforms should have failed, but did not. These results indicated that the biases specific to foundation failure modes may be higher than those of jacket failure modes. The biases in predictions of foundation failure modes were therefore investigated further in this study. The work included capacity analysis and calibration of predictions with the observed behavior for 3 jacket platforms and 3 caissons using Bayesian updating. Bias factors for two foundation failure modes, lateral shear and overturning, were determined for each ...
The ruptured offshore oil well 80 miles from Mexican town of Ciudad del Carmen, which poured 8000 barrels of light oil a day into the Gulf of Mexico, provided marine scientists with the opportunity to monitor the spill and see what happens to petroleum hydrocarbons in sea water. Scientists followed changes in viscosity, surface tension, and buoyancy of individual oil globs as they moved through the water and interacted with the surface slick. Using gas chromatography and mass spectroscopy, chemists are gaining an understanding of the unique characteristics of the oil. Computer-generated models projected the slick's movement in the Gulf in response to wind and wave pressures, but the sophisticated system did not give an accurate daily prediction. Immediate damage to fish, turtles, and sea birds was documented by tagging. Long-term effects will take longer to ascertain since 25 years is generally required to flush oil out of sediments. ...
Petro-Canada's Terra Nova offshore oil platform was designed with the expectation that its Floating, Production, Storage and Offloading (FPSO) vessel would be taken off location for maintenance and modifications work within the first 10 years of operation. Petro-Canada's 2006 extended Turnaround project was initiated to prepare for the maintenance and transport of the FPSO. The project aimed to execute an extended turnaround in approximately 90 days. The cost of the project was estimated at $190.5 million. Shutdown occurred early on May 7, 2006 due to the failure of a generator gearbox. Staff were increased from 80 to 120 to complete critical preparation work. On June 17, the FPSO was disconnected and departed for Conception Bay. A turret cover plate was installed, and the FPSO began its voyage to a Rotterdam shipyard in the Netherlands. In order to complete the journey, a ...
A lower energy efficiency standard for buildings (EPC) can have a negative impact on thermal comfort and indoor air quality. Cooperation and integrated design are preconditions for a correct use, installation and maintenance of heating and ventilation systems in buildings. [Dutch] Er komt steeds meer kritiek op de wijze waarop in ons land woningen en gebouwen worden gebouwd. Op dit moment is het vooral woonhuisventilatie waar veel om te doen is. Van beleidsmakers tot aannemers en van Consumentenbond tot gezondheidsdiensten; iedereen vraagt zich af of we met vergaande isolatie onze woningen en gebouwen nog wel leefbaar houden. In dit artikel wordt een pleidooi gehouden voor onderlinge samenwerking en integraal ontwerp als randvoorwaarden voor een goede toepassing, installatie en onderhoud van verwarmings- en ventilatiesystemen in gebouwen.
The influence of membrane pH gradients on the transbilayer distribution of some common phospholipids has been investigated. The authors demonstrate that the transbilayer equilibrium of the acidic phospholipids egg phosphatidylglycerol (EPG) and egg phosphatidic acid (EPA) can be manipulated by membrane proton gradients, whereas phosphatidylethanolamine, a zwitterionic phospholipid, remains equally distributed between the inner and outer monolayers of large unilamellar vesicles (LUVs). Asymmetry of EPG is examined in detail and demonstrated by employing three independent techniques: ion-exchange chromatography, {sup 13}C NMR, and periodic acid oxidation of the (exterior) EPG headgroup. In the absence of a transmembrane pH gradient ({Delta}pH) EPG is equally distributed between the outer and inner monolayers of LuVs. When vesicles composed of either egg phosphatidylcholine (EPC) or DOPC together with 5 mol % EPG are prepared with a transmembrane {Delta}pH. EPG ...
Authors already reported the integrated system so called SODAS (System Of Design and Assembling for Shipbuilding) which was based on product model concept. And products in shipbuilding industry today are not limited to ship structures alone. Therefore, it is desirable that a more global product model which can describe another products such as offshore structures should be considered. In this paper, a product model of offshore structures is discussed. Compared with the case of ship structures, the distinctive feature in the design stage of offshore structures lies in the initial design stage. Thus in this paper, some of the new model in initial design stage are introduced. Some of them are `Function Element Model` which expresses functional concept by designers. In the other design stage, product information such as `Room` and `Part` which were already introduced in SODAS are used effectively for a product model of ...
Floating Production, Offshore Storage and Offloading (FPSO) of hydrocarbons is not new. However, offshore crude oil development has to face the increasing need of the geopolitical interests to develop smaller or difficult reservoir in remote areas in deeper water and harsher environment. Such a trend can only be sustained if the offshore technology provides the right tools at the right time and at an acceptable price. This article will attempt to describe the relative merits of FPSO systems and discuss its main components. An overview of the present world situation shows the excellent performance of the FPSO with the type of development strategy undertaken in P.R.C.
The Maritime Transportation Security Act of 2002 amended the Deepwater Port Act of 1974 to permit the construction of offshore liquefied natural gas (LNG) terminals. Terminals with environmentally destructive open-loop regasification systems were quickly approved in the Gulf of Mexico. This study analyzed the political methods of the George W. Bush administration to determine how it developed offshore LNG. Findings showed that the Bush administration worked closely with the energy industry to promote national energy security and limited the role of certain federal and state agencies through a centralized policy process.
The article presents briefly the plans of the British Petroleum Oil Company for a new hydrogen power plant that includes an offshore platform in the North Sea.
On April 20, 2010 the Deepwater Horizon offshore drilling rig located in the Gulf of Mexico experienced an explosion resulting in at least 11 deaths and creating ...
Safety in general and harmonization of International Maritime Organization rules on mobile offshore drilling rig operation in particular are discussed. The improvement of the industry's safety record is also discussed.
The offshore and inshore wave energy resource in Asturias (N Spain) is studied using wave buoy data and a hindcast dataset spanning 44 years (1958-2001). Offshore average wave power and annual wave energy values are found to exceed 30 kW/m and 250 MWh/m, respectively, at 7 of the 11 study sites. This substantial resource is characterised in terms of the sea states involved. Most of the energy is provided by IV quadrant waves with significant wave heights between 2 m and 5 m and energy periods between 11 s and 13 s. After analysing the offshore resource, numerical modelling is used to investigate the inshore wave patterns. A coastal wave model is validated with wave buoy data and applied to three case studies representative of storm, winter and summer conditions. Inshore wave energy concent...
Jan 12, 2010 ... Visual simulation of offshore liquefied natural gas (lng) terminals in a decision-making context. Baird, Brian E.; Sheppard, Stephen R. J.; ...
May 13, 2010 ... Abstract: On April 20, 2010, an explosion occurred on the semi-submersible offshore drilling rig Deepwater Horizon in the Gulf of Mexico, ...
Due to the advantages of the flexibility and economics in exploration and production of offshore liquefied natural gas (LNG), the floating production storage and offloading unit for liquefied natural gas (LNG-FPSO) has attracted wide attentions in recent years. The offloading system for LNG transportation from LNG-FPSO to LNG carrier is one of the most important parts in LNG-FPSO. The influences of the main parameters such as the mass flow rate and the height difference of the pipeline. on the performance of LNG offloading in offshore associated gas fields were investigated. A model based on a typical offshore LNG offloading system was first established and simulations were conducted. The governing equations were then used to evaluate the effects of parameters together with the simulation ...
IntroductionFocusing on people and organizations, this paper aims to contribute to offshore safety assessment by proposing a methodology to model causal relationships.MethodThe methodology is proposed in a general sense that it will be capable of accommodating modeling of multiple risk factors considered in offshore operations and will have the ability to deal with different types of data that may come from different resources. Reason's ?Swiss cheese?? model is used to form a generic offshore safety assessment framework, and Bayesian Network (BN) is tailored to fit into the framework to construct a causal relationship model. The proposed framework uses a five-level-structure model to address latent failures within the causal sequence of events. The five levels include Root causes level, Tr...
The model was based on a SEDCO 700 series semi-submersible offshore drilling rig used for operations in the North Sea. This report supplements earlier work on wind-heeling moments which are required to establish stability criteria on semi-submersibles. Wi...
Wind-tunnel measurements were taken of the time-average aerodynamic forces and moments on a notional model of a semi-submersible offshore drilling rig at two heights and at various attitudes to the wind. Attempts were made to analyze the separate effects ...
Pile foundations are extensively used to support off-shore and on-shore structures. Under dynamic loads, the behavior of single pile is well understood. However the soil-pile-soil interaction studies are confusing, on which account the analyses do not necessarily predict response of the systems which may match satisfactorily with the performances. In this paper, the nature of dynamic loads is described, and solutions for soil-pile and pile-soil-pile interaction solutions by several authors are presented and a critical evaluation is made.
The position paper will provide the basis for further strategies on offshore wind power development in consideration of ecological and conservation aspects. [German] Das Positionspapier des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit (BMU) einschliesslich des Umweltbundesamtes (UBA) und des Bundesamtes fuer Naturschutz (BfN) ist Ergebnis der Arbeiten der BMU-Projektgruppe 'Windenergienutzung im Offshore-Bereich im Hinblick auf die BMU-Anliegen'. Es beschreibt den derzeitigen Stand einer Strategie zur umwelt- und naturvertraeglichen Erschliessung der Windenergienutzung auf See (Offshore). Es bildet die Grundlage fuer die Weiterentwicklung dieser Strategie und dabei insbesondere zur Abstimmung mit den Anliegen anderer Bundesressorts und den Kuestenlaendern, sowie zur intensiveren Einbeziehung beteiligter Verbaende und Fachkreise. Vor dem Hintergrund der zur Genehmigung eingereichten ...
The invention deals with an offshore drilling or production platform in particular designed for quake-active areas. The platform rests on the sea bed with a low-gravitational weight and anchored to stabilized pile foundations absorbing the horizontal and vertical acting forces from earthquakes. The platform including pillars can be made of different materials, prestressed concrete in particular. 3 figs.
This book shows the severe environmental price we pay for offshore oil drilling, and shows how citizens can take action to protect the nation's shores. This is a handbook for anyone with a stake in the health of the environment. It includes alternatives for decreasing our reliance on offshore drilling, and guidelines for citizens who want to make their opposition heard.
Clastic sediments of Albian age provide hydrocarbon source rocks, reservoirs and seals. Major reservoirs occur in sandstones to the north, and have a limited reservoir potential in offshore Qatar. Distal shales are a major seal in offshore Qatar, the United Arab Emirates and Oman. Local source-rock potential exists in the northern part of the Arabian Gulf and in the extreme SE of Saudi Arabia (in the Rub Al Khali Basin). (author)
The purpose of the invention is to simplify assembly and to reduce labor intensity. This is achieved by the fact that the assembly shaft is positioned in a hawser, while its wall which is turned towards the body of the installation is combined with the hawser wall, where a U shaped opening is made in the wall of the assembly shaft, along the edges of which there is a hermetically sealing device, while the bottom of the body of the offshore drilling rig is equipped with a rigid insert attached with the capability of adjoining it with the hermetically sealing device.
As its indigenous gas supplies decline, the UK will need to import more gas. In November 2006, the Department of Trade and Industry issued a consultation on revising the consent regime for offshore gas storage and offshore liquefied natural gas unloading. A total of 27 responses had been received by the closing date of 16 February 2007 from a variety of interest parties including developers and their representative organisations, consultants, environmental organisations, maritime organisations, heritage organisations and other public bodies. This report presents the Government's response to the views expressed by these respondents. The majority of respondents supported the Government's proposals to put in place new legislation to permit offshore gas storage activities. Many believed new legislation was necessary to provide the legal certainty necessary ro encourage offshore development ...
A modified boundary element approach was used to analyze the response of offshore piles subjected to external soil movements. The computer model employed to solve the pile-soil problem was able to model pile head and tip loading, and loading caused by lateral movement of soil. A nonlinear pile-soil interface element with the ability to represent a hardening or softening plastic response prior to reaching an ultimate state was incorporated. With the program, 4 failure modes can be determined: flow of the soil slide past an intact stationary pile; rotation of the pile with the soil at failure along the full pile length; translation of the pile with the sliding soil, resulting in failure of the supporting soil; and the long-pile mode, in which the maximum bending moment in the pile reaches the yield moment of the pile before complete development of the other 3 modes. Theoretical solutions for a realistic hypothetical offshore pile subjected to ...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). It was prepared following the Canada-Newfoundland and Labrador Atlantic Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation (Newfoundland) Act. In December 2001, the C-NLOPB approved the White Rose Benefits Plan. This document described the work that Husky proposes to undertake within its significant discovery license areas 1043 and 1044 for the development of the South White Rose Extension (SWRX) Tie-back to the White Rose Floating Production, Storage and Offloading (FPSO) vessel as it will require an amendment to the original White Rose Development Plan and is subject to the review and approval of the C-NLOPB. The statutory requirements as well as the actual policies and procedures were identified ...
The South White Rose oilfield, offshore Newfoundland, owned jointly by Husky Oil (82.5 per cent ) and Petro-Canada (17.5 per cent) is being developed using a floating production storage and offloading (FPSO) system. Some industry stakeholders claim that the oil should be produced using a concrete gravity base system as used in the Hibernia Field. However, Husky Oil officials are confident that the choice of the FPSO is well justified, based on its cost effectiveness and economic viability. Several production facility options have been assessed, taking into account feasibility, deliverability, economic attributes. risk and safety . The assessment results clearly pointed to FPSO as the preferred system based on its commercial and technical flexibility, proven track record in harsh environments, its ability to produce both oil and gas in sequential development, its promise of production at full capacity earlier than a gravity base system, and easier decommissioning ...
The Terra Nova offshore oil project is described, with emphasis on the construction of the Terra Nova Floating Production Storage and Offloading (FPSO) vessel, the first such vessel constructed for the harsh environment of the North Atlantic off Newfoundland, the site of an oil field that is expected to produce 125,000 to 150,000 barrels of oil per day starting in 2001. The vessel has a double-hull, made of 3,000 tons of reinforced steel to protect it from ice in the form of massive icebergs or crusty 'packs'. The vessel has the world's largest quick release turret, meaning that the vessel can be quickly disconnected from its turret and mooring in the event of an encroaching iceberg, and then reconnected in an environmentally sound way. Apart from its extremely rugged construction, protecting the FPSO vessel against icebergs is accomplished by way of 'hosing down' (by melting by powerful streams of ...
The Dalia field is located 210 km north west of Luanda (Angola), about 140 km from shore in 1400 meter water-depth. It was the second major discovery out of 15 made in the block 17 operated by Total. The Dalia Umbilical, Flow lines and Risers EPCI Contract was awarded in 2003. The sea-line network to connect and control the 71 wells and 9 manifolds consist of the following: 40 km of insulated pipe in pipe (12 inches into 17 inches) production flow lines; 45 km of 12 inches water and gas injection lines; 6 off 1.7 km flexible water and gas injection risers; 8 off 1.65 km flexible Integrated Production Bundle (IPB) risers; 75 km of control umbilicals. The flow assurance and associated insulation requirement of the production transport system was one of the main challenges of the project. With a crude temperature of 45 deg C at the wellhead and the required minimum temperature of 35 deg C on arrival at the FPSO, this problem was complex. Understanding that, due to the ...
The Offshore Comet is a modern offshore drilling rig with a hydraulic-cylinder-actuated jacking (raising and lowering) system. Hydraulic-cylinder jacking provides a safe and efficient method for placing the rig at the desired height above the water and insuring that it can withstand the expected heavy loads imposed by machinery, supplies, and the ocean environment. The drilling rig consists of a steel-hulled barge that is floated to the site and then supported during drilling operations by four steel triangular-cross-section lattice legs. The legs are planted firmly on the ocean bottom by a procedure called preloading. Each leg with its integral footing weighs 657 tons. The barge with its deck load can weigh up to 9200 tons.
Background, Aim, and Scope The identification and assessment of environmental tradeoffs is a strongpoint of life cycle assessment (LCA). A tradeoff made in many product systems is the exchange of potential for occupational accidents with the additional use of energy and materials. Net benefits of safety measures with respect to human health are best illustrated if the consequences avoided and health impacts induced by additional emissions are assessed using commensurable metrics. Our aim is to develop a human health impact indicator for offshore crane lifts. Crane lifts are a major cause of accidents on offshore oil and gas (O & G) rigs, and health impacts from crane lift accidents should be included in comparative LCA of O & G technologies if the alternatives differ in the use of crane li...
The PARLOC Pipeline and Incident Databases provide the most complete information available on North Sea pipelines and risers from 1975. The database information enables the frequency of incidents which either result, or have a potential to result, in loss of containment to be related to the pipeline population as a whole or expressed as a function of particular pipeline characteristics. The importance of the PARLOC study in risk assessments of offshore pipelines is acknowledged worldwide and it is recognized as having contributed positively to their safer operation. Continuing improvements ensure that it remains a key reference in risk assessment studies. This paper describes the improvements which are being made to the study and shows how PARLOC is being used by the offshore industry in the consideration of pipeline safety. The rationalization of current arrangements for regulating pipeline safety presented in the new UK Pipeline Safety ...
Mobile offshore drilling rigs are used to drill, complete and workover wellbores in marine environments. The fleet that exists today consists of a wide variety of vessels built to various specifications over the past three decades, and because they operate in harsh, corrosive environments, they wear out structurally and require periodic maintenance. Rig designs have evolved with changes in operating requirements and new technology and rigs are frequently modified and upgraded, depending upon market conditions, operator preferences and other factors. The construction and replacement costs of offshore rigs are often used for management planning, financial valuation and insurance analysis, and because of the wide variety of designs, specifications and upgrades, cost estimates vary widely. In ...
Remote, offshore gas reserves have long been a challenging deepwater petroleum resource to tap. Natural gas in many offshore regions is plentiful, but lacks access to the market because of the logistical challenges and costs. Most large offshore gas discoveries are capped, and gas associated with oil production is re-injected into the reservoir or is flared. A more attractive option is to convert the gas into a liquid product on a floating production, storage, and offloading (FPSO) vessel. However, some conventional process technologies are not well suited for operation on floating vessels that are highly space and weight constrained and may challenge vessel stability during inclement weather. Microchannel process technology units under development offer intensified processes that are suit...
In 1982 the semi-submersible drilling unit Ocean Ranger capsized and sank off the Grand Banks, resulting in the loss of the entire 84-man crew. A Royal Commission was set up to conduct an enquiry into the incident, and to carry out a process of research and opinion-gathering towards providing recommendations to both federal and Newfoundland governments. The primary purpose of the Commission was to determine why the Ocean Ranger sank, why none of the crew were saved, and how to avoid similar disasters. A number of studies and seminars were held to focus expert knowledge and opinion in several key fields and to update studies and fill gaps in the data base. Summaries of selected study reports and the seminar proceedings are presented in the following areas: the environment, including ice, marine climatology, weather forecasting services, wave climatology, oceanographic information, and seabed information; design, including mobile offshore drilling rig design ...
Apr 25, 2010... oil per day were leaking from an oil well in the Gulf of Mexico in late April, following an explosion at an offshore drilling rig on April 20, 2010. ...
The first offshore wind farm in Sweden; Bockstigen, consists of five 500 kW stall controlled wind turbines on mono pile foundations. The main objectives of the technical evaluation are to verify the original design assumptions made for a load carrying mono pile and bedrock, investigate offshore power production versus onshore ditto as well as to determine park effects and analyse meteorological multi-mast statistics which serve as reference data to a newly developed computer code for offshore wind energy potential mapping. The 'main' measurement system has continuously been acquiring data at 1 and 20 Hz/channel since the summer of 1998. A 40 m meteorological mast was built within the wind farm in the summer of 1999 in order to acquire relatively undisturbed wind speed data from 'free' sectors as well as to enable wake measurements. The mono pile and tower of one of the turbines are ...
Field campaigns were conducted in 1981 and 1982/83 on the Dutch coast near Egmond. Measurements were made of surface elevations, water velocities and sediment concentrations in 3 to 8 surf zone locations and 2 to 5 offshore locations simultaneously. A des...
Due to the advantages of the flexibility and economics in exploration and production of offshore liquefied natural gas (LNG), the floating production storage and offloading unit for liquefied natural gas (LNG-FPSO) has attracted wide attentions in recent years. The offloading system for LNG transportation from LNG-FPSO to LNG carrier is one of the most important parts in LNG-FPSO. The influences of the main parameters such as the mass flow rate and the height difference of the pipeline. on the performance of LNG offloading in offshore associated gas fields were investigated. A model based on a typical offshore LNG offloading system was first established and simulations were conducted. The governing equations were then used to evaluate the effects of parameters together with the simulation results. It was found that there was an economic mass flow rate for practical design on balance of the cost in pump head and BOG. The ...
Independent drilling contractors own all offshore drilling rigs, which they lease to oil and gas companies for use in their pursuit of their exploration and development plans. Oil and gas companies' demand for these rigs can vary quickly and dramatically in response to changes in the world market for oil and natural gas. As a result, drilling contractors often try to manage excess capacity by idling rigs (known in the industry as "stacking" a rig), reactivating them when demand recovers. This paper examines these decisions over the course of a price cycle in 1998-2000 to investigate the role of firm and rig heterogeneity in determining drillers' decisions about idling and reactivating capacity.
This paper describes the safety system and training for personnel on board the floating production storage and offloading (FPSO II) currently working in the Cadlao Field, offshore Palawan in the Philippine Islands. (See Figure 1). The crude oil being produced has wellstream hydrogen sulfide concentrations up to 6000 PPM. Concentrations of hydrogen sulfide at 700 PPM or higher can be immediately dangerous to life and every effort must be made to ensure personnel safety.
This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)
The Eiric Raude offshore drilling rig is a powerful machine that is suitable for drilling in harsh environments in ultra deep water. It has a total drilling depth of 8,200 to 10,000 metres and an operational displacement of 53,400 mt. The rig complies with the regulatory regimes of Norway, the United Kingdom and Canada. The Eiric Raude has drilled 5 deepwater wells offshore eastern Canada, 1 well offshore Cuba, 1 well west of Shetland, and 3 offshore Norway. The environmental criteria for extreme weather conditions consider wave, current and wind forces. The general operational guidelines were discussed along with key areas for prevention of environmental impact, including emissions from well testing, air emissions from diesel engines, cooling water, bunkering operations, discharges from drilling, accidental discharges, drain water, and domestic sewage. It was noted that the zero discharge philosophy is ...
The results of an extensive, detailed geologic and geophysical evaluation of the offshore South Florida basin show this area to have considerable hydrocarbon exploration potential. Geophysical mapping on six key horizons identified numerous structural closures at Dollar Bay through Bone Island mapping levels. Geologic evaluation indicated at least four viable potential reservoir horizons, including the Sunniland formation - the main producing unit onshore in what is called the Sunniland trend. Mature, organic rich carbonate source rocks are found in several stratigraphic intervals throughout the basin, and extensively developed seals consisting of micritic limestones and anhydrites are also common in the stratigraphic section. All the critical factors for hydrocarbon accumulation - source, reservoir, trap, and seal - appear to be present in the offshore Pulley ridge area of the South Florida basin. Using high-resolution seismic data, additional ...
Recent organic geochemical studies differ radically in their interpretation of the origin of the Gulf coast oils. However all studies since (and including) Thompson, et al. 1989, emphasize the considerable geographic variation in genetic oil types and are in generalized agreement as to the genetic oil types present and their spatial and stratigraphic relationships. In particular it is accepted that the Gulf rim (both north and south) is encircled by a ring of Mesozoic carbonate-sourced oils and that there is also at least one major deep water trend of carbonate-sourced oils in the northern Gulf. It is also generally agreed that many of the Gulf rim oils are of Oxfordian-Kimmeridgian age, though some, like the Sunniland oils of Florida, are of lower Cretaceous origin. Major disagreement still occurs over the sources of the Louisiana offshore oils and onshore Wilcox reservoired oils. One {open_quotes}school of thought{close_quotes} assigns all these oils to Mesozoic ...
BHP Petroleum (BHPP) has now operated the 164 tonne per day Methanol Research Plant (MRP) located on the outskirts of Melbourne, Australia for over one year. This plant was commissioned in 1994 making first methanol on 17th October and has operated since then, selling product by pipeline to two local customers, ICI Adhesives and Borden Australia. The plant is based on the Leading Concept Methanol technology (LCM) licensed from ICI Katalco. Since 1985 BHPP has been involved in the development of Floating Production Storage and Offloading (FPSO) technology for the production of oil and gas offshore. In order to utilize the gas associated with oil on remote offshore oil production facilities the combination of gas conversion to methanol and existing FPSO technology is being investigated. The LCM technology being commercialized at the MRP is part of the strategy to demonstrate and develop LCM technology such that it could be located on the deck of ...
The US Environmental Protection Agency (EPA) conducted a cost-effectiveness (CE) analysis to estimate the incremental cost of complying with the proposed effluent limitation guidelines (ELGs) for the coastal oil and gas industry (EPA 1995a). EPA`s CE analysis calculates the pounds of each pollutant that would be removed if the chosen discharge option is selected. In 1993, EPA issued final ELGs for the offshore oil and gas industry and published an offshore CE analysis. The chemical characteristics of produced water from the offshore region are essentially the same as those of produced water from the coastal region. It was surprising, therefore, that EPA chose a much longer list of pollutants and generally stricter weighting factors for the coastal CE analysis. This report reviews the data, assumptions, and analyses used in EPA`s coastal CE analysis and identifies alternate data, assumptions, and analyses that could lead to ...
This paper considers the technical progress in offshore pipeline construction with limitation to some general subjects covering pipeline design, installation and start-up. In future the use of limit state pipeline design philosophy, may be implemented as an alternative to the stress based design commonly used to day giving a potential for further optimisation of the pipeline design and consequently reduction of the initial investment. Comprehensive research and development efforts in Norway in the second half of the 1970`s, made it technically feasible to cross the deep water Norwegian Trench in the 1980`s. In addition, the development of several offshore pipeline systems until to day including gas distribution systems to the European continent, have brought Norway to the forefront of technical expertise
On ships, tankers and similar vessels structural defects such as cracks and corrosion damage are typically repaired by welding. However, welding is unwanted hotwork on floating offshore units (FOUs) such as floating, production, storage and offloading (FPSO) and floating, storage and offloading (FSO) vessels because it requires shutdown of parts of the vessel thus resulting in expensive production delays. Bonded fibre composite material patch repairs can be used as an alternative to overcome the hazards of hotwork associated with welding. The patches are bonded over the defect and the integrity of the original structure is hence restored. The patch repair technology can also be utilised to provide upgrades, such as life extensions and higher design requirements. A recommended practice (RP)...
The moderate earthquake of magnitude 5.2 was occurred at the offshore Uljin on the 29 May 2004. The magnitude of the event is the largest one which is equal to that of the Sokrisan earthquake on the 16 September 1978 since the beginning of the instrumental recording by the Korean Metrological Administration (KMA) in 1978. The magnitude of the event was large enough to be felt in a wide area of the southern Korea. It did not affect the safety of the Uljin nuclear power plant (NPP) site which is about 80 km away from the epicenter. In this article, we estimate source parameters of the event and evaluate preliminary seismic safety of the Uljin NPP site regarding the event as an empirical Green's function (EGF)
The use of Floating Production Storage and Offloading (FPSO) vessels to develop UK offshore oil fields looks certain to increase. Of the 64 new offshore fields due for development in the next few years, 15 are expected to use FPSO vessels for their production. Most of these are small, short-life fields in the central North Sea which would not justify investment in a fixed platform. Three, however, are large fields west of Shetland, and one, the Foinaven field, is scheduled to be the first commercial development in this area, perhaps setting a precedent. Floating production systems with substantial storage capacity can be the best option in deepwater locations which are remote from existing infrastructure, where the cost of an export pipeline would be prohibitive. (author)
The purpose of this rulemaking is to amend the effluent limitations guidelines and standards for the control of discharges of certain pollutants associated with the use of synthetic-based drilling fluids (SBFs) and other non-aqueous drilling fluids in portions of the Offshore Subcategory and Cook Inlet portion of the Coastal Subcategory of the Oil and Gas Extraction Point Source Category. These proposed limitations apply to discharges or effluent generated when oil and gas wells are drilled using SBFs or other non-aqueous drilling fluids (collectively referred to simply as SBFs) in coastal and offshore regions in locations where drilling wastes may be discharged.
The Jeanne d`Arc Basin is located 320 km offshore in the Grand Banks of Newfoundland. It is a Mesozoic failed-rift basin with recoverable oil reserves of about 2 billion barrels. Its huge Hibernia Field will be in production by late 1997. The basin has been reappraised using sequence stratigraphic concepts, and renewed exploration in the area is expected. The Upper Jurassic - Lower Cretaceous sedimentary accumulation in the Basin was formed by the extensional tectonics that created the North Atlantic Ocean. The sedimentary packages were placed in chronostratigraphic order by calibrating the biostratigraphy of the Oxfordian to Maastrichtian section to the detailed ammonite zonation from the North Sea.
ObjectivesThe practical exploitation of tidal stream energy is limited by man's activities in coastal waters: navigation, fishing and~%~leisure pursuits. It is important therefore to make the best use of the sites, which are available. The main objective of the~%~Proposed study is to assess the limits imposed by waves on the performance of tidal stream rotors, and to investigate way:~%~in which these limits might be related by refinements in rotor design and the control of operating conditions. Secondary~ [continued...]DescriptionHorizontal aids wind turbines have been recognised as one of the most successful renewable energy saving devices. The use of the similar concept as a 'tidy stream rotor' in offshore environment appears to be even more compelling. However, the application of this concept will require the confirmation of various operational and environmental limitations due to complexities of offshore environment compared to those of on ...
A historical review of floating production storage and offloading (FPSO) systems for marginal fields is presented. The areas in which such systems are operating, ranges of model tests, and current applicability of mooring systems are reviewed to present capabilities of these concepts. Limitations are reviewed to assess the applicability of these concepts to similar sites. Consideration of processing operations on floating vessels are identified. Particularly, the effects of vessel motion on the processing equipment, gas disposal, and crude offloading are addressed. It will be shown that operations are becoming well understood and routine. Future problem areas and solutions under development are identified. Specific examples are cited and design refinements are noted. While various floating production systems have been in operation for only a few years, their potential for solving the problems of producing small offshore fields and for achieving early production is ...
Various theories and examples of modelling, forecasting and optimization designing in the different parts of the petroleum and gas industries are presented, stochastic programming for long term planning in the refining industry, stochastic model for gasoline blending, feedstock optimization, location and sizing for offshore platforms, hydrocarbon exploration simulation rapid method, valuation of oil field development leases, economic models for petroleum allocation, models for oil supply market, trade embargo game theory, stochastic programming of gas contract portfolio management, scheduling transportation of oil and gas, strategic planning in an oil pipeline company, simulation of offshore oil terminal systems, hierarchical selection of oil and gas distribution systems.
Corrosion is said to be the most dominant factor which affects the physical life of ships and offshore structures. In order to secure the structural safety of ships and offshore structures, it is necessary to take measures to corrosion based on the prediction of condition of progressive corrosion. But such prediction is difficult because the behavior of corrosion`s progress is probabilistic. In this paper, probabilistic model, which could evaluate the degradation of coatings and the successive corrosion of steel members, was proposed in order to explain the tendency of the actual corrosion conditions of existing ships. Then, statistical inferences on the proposed model were made by applying the actual data on plate thickness measurements of Bulk Carriers` Cargo Hold. And validity of the proposed model was verified.
A procedure for lowering an offshore rig support block into water, one with water displacement elements, including transfering a structure ready for installation from construction supports onto the grillage that has been set up on the slide, and then lowering the structure together with the grillage into the water. With the goal of dereasing the volume of hydrotechnical operations, the slides have been extended only to the waterline, and the water-displacing elements of the support block are mounted or the structure in a manner whereby the following conditions are fulfilled: Msigmaless than or equal toM /SUB wi/ sigma-W/Lless than or equal toq where Msigma, M /SUB w/ - are the mass moments of the support block and bouyancy forces correspond to the threshhold; sigma and W - the weight force and bouyancy; L - the support length of the block on the grillage; q - the allowable linear load for the support block structure.
This document gathers the available presentations (articles and transparencies) given at this annual meeting, the 2007 topic of which was the technological, geopolitical, economical, environmental, societal and development stakes of energy. 1 - technological stakes - which energies for the future: new energies, illusion or solution of the future; the Lorraine region, an energy land: strategies and stakes for a sustainable development; from China to Brazil: understanding the nuclear energy revival; hydroelectric power: renewable and sustainable energy; renewable energies and environment protection: the contribution of biofuels; wind power in Germany between success and contestation; 2 - geopolitical stakes - energy levier of power: the Gulf of Guinea hydrocarbons: between development and geopolitics; the complex evaluation of resources and reserves between technology, market and geopolitics; the new Bakou-Tbilissi-Ceyhan pipeline: what impacts for Turkey and the European Union; 3 - ...
HOAI und Vergabe - erste Erfahrungen mit den Novellen 29. Stahlbauseminar INTAB+ Seminar 2010 Verbundbrucken mit integralen Widerlagern Hamburg Offshore Wind Conference 2010Perfect know-HOW Leichtbausysteme aus Stahl fur Dach und Fassade. Energie- und kosteneffiziente Losungen fur Neu- und Bestandsbau Lubecker Bautag
An integrated multiwell floating production, storage, and offloading (FPSO) facility was successfully installed at the Tazerka field offshore Tunisia in 1982. Because there is good reason to believe that the installation techniques developed for the Tazerka FPSO can be applied to even larger systems in deeper waters, this paper presents the design and step-by-step installation procedures developed at Tazerka.
An atlas series about the offshore northern Gulf of Mexico will group gas and oil reservoirs into subregional plays and will display reservoir data on a computerized geographical information system. The atlas series will provide critically compiled reservoir engineering data to help the private sector explore and develop hydrocarbons and to help the public sector analyze the hydrocarbon endowment in this basin. In this report, we cover aspects of the play-analysis procedure and provide specific examples of lower Miocene plays from the upper Texas coast and Federal Outer Continental Shelf (OCS). Play analysis emphasizes using broad classes of structural style, depositional style and environments, and defining attributes to group reservoirs into plays. To date, we have identified 4 Oligocene and 25 Miocene plays in Texas State offshore waters and 115 plays in the Federal OCS. Texas State offshore plays are gas prone ...
This book provides discusses recent developments in oil pollution control instrumentation. Some of the topics covered are as follows: 1. Technical requirements of the IMCO International Performance and Test Specification A393x concerning oil content meters; and 2. Oil in water detection; and 3. Methods for the disposal of recovered oil and oily sludge; and 4. Oil content monitoring at ballast water treatment facilities and offshore production platforms.
Separate abstracts were prepared for 20 papers in this conference report and includes all papers in the ''engineering'' section (program E). Ocean thermal energy conversion (OTEC), moorings, cables, corrosion protection, corrosion testing, coatings, offshore platforms, pipelines, OTEC models and pilot plants, and energy transfer are topics discussed.
A case study of a hypothetical offshore production fixed leg platform facility is presented. The purpose of the case study is to demonstrate the advantages offered by modern, fuel efficient large gas turbines in central power generation service for offshore production. The case study was presented using the Rolls- Royce RB211 large gas turbine with facility production of approximately 240,000 BPD of oil and 540 MMSCFD of associated gas. The gas was subjected to three stages of separation for removal of hydrocarbon liquids and water. The liquids, natural gas, and crude oil were exported from the production platform to an onshore receiving terminal. Gas compression is the service that requires the greatest amount of power for any given production facility. For this case study, gas compression represented approximately 70 per cent of the power load with the remainder represented by the liquid export pumps (16 per cent), and by general utilities ...
The use of an SCR-controlled power system on an offshore drilling rig has lead to an increased acceptance of high technology equipment. Such equipment increases drilling productivity, reduces maintenance, and improves reliability. Most new rigs now have AC squirrel cage motors, brushless AC generators, silicon controlled rectifiers, DC motors, and swtichgear and motor starters. Several opportunities for cost reductions in SCR systems, such as improving the power factor, are studied in this paper.
Explosives have been used in the removal of offshore wellhead devices for a number of years. In 1975, the first liquid explosives were run to remove wellheads and have proved to be a safe and reliable method of severing and salvaging the wellhead equipment from most depths of water. Methods of explosive wellhead removal and the areas of safety, reliability, and economics are discussed.
This report describes outer continental shelf oil and gas activities in the Atlantic Region. This edition of the Atlantic Update includes an overview of the Mid-Atlantic Planning Area and a summary of the Manteo Prospect off-shore North Carolina. 6 figs., 8 tabs.
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
The work reported here encompasses analyses of specific potential spill scenarios for oil exploration activity planned offshore of Namibia. The analyses are carried out with the SINTEF Oil Spill Contingency and Response (OSCAR) 3-dimensional model systems. A spill scenario using 150 m{sup 3} of marine diesel demonstrates the rapidity with which such a spill will dissipate naturally, even in light winds. Vertical and horizontal mixing bring subsurface hydrocarbon concentrations to background levels within a few days. A hypothetical 10 day blowout scenario releasing 11,000 bbl per day of light crude oil is investigated in terms of the potential for delivering oil to selected bird and marine mammal areas along the Namibian coast. Worst case scenarios are selected to investigate the potential mitigating effects of planned oil spill response actions. Mechanical recovery significantly reduces, and in some cases eliminates, potential environmental consequences of these ...
This review updates a previous review entitled ''Impact of Oil on the Marine Environment''. It covers oil and individual hydrocarbons, used lubricating oils, chemical control agents for oil spills, and wastes from offshore petroleum operations. It considers all major knowledge generated since the mid-1970s. The review covers its topics comprehensively, from a consideration of the composition, sources and inputs of oil to its ecological and human health effects and its effects on man's use of the sea. The review addresses several key questions on the present levels of contamination, the impact of hydrocarbons and related chemicals on marine biota, the recovery potential of marine ecosystems exposed to these contaminants, the degree of protection required for marine ecosystems known to be vulnerable and sensitive, and recommended research and other actions to fill gaps in knowledge. The review describes the hazards of marine oil pollution and associated chemicals and ...
This Health and Safety (HSE) document offers technical information on the design of foundations for supports in offshore installations, and relates particularly to the North Sea. It is based largely on guidance offered earlier in Section 20 of the Fourth Edition of the Health and Safety Executive's 'Offshore Installations; Guidance on Design, Construction and Certification', which was withdrawn in 1998. The document contains a general section on foundations and the rest of the document comprises sections on: (a) piled foundations (planning, problems, pile make-up, steel stresses, design of pile foundations, axial pile capacity, factors of safety for piled foundations, load-deflection of piles, and piles for tethered buoyant structures); (b) foundations for gravity structures (foundation types, loads and reactions during installation, operating loads and reactions, foundation problems, cyclic load failure, factors of ...
An unmanned aerial vehicle called RAVEN, said to be capable of remote tracking of onshore and offshore oil and gas facilities, has been developed by a group of graduate students from Memorial University of Newfoundland. RAVEN is claimed to be capable of performing a number of tasks under its own control without the need for human intervention, including checking onshore pipelines for damage, or scouting the path of hazardous icebergs offshore. The RAVEN was created to meet the need for real time iceberg tracking and early hazard detection, supplementing or replacing the present method of RADARSAT images and tracking by manned aircraft. The RAVEN can be launched from any platform; it can fly under conditions that would be too dangerous for a manned aircraft. Currently in the prototype stage, the first trial flight for the RAVEN is expected to take place in September 2002. The first flight will consist of five GPS waypoints set relatively close ...
A method is described for testing a diverter system on an offshore drilling rig of a type having a marine riser assembly extending to a subsea well, the diverter system having a packer element and at least one port located below the packer element for the passage of drilling fluid flowing upward from the marine riser assembly during drilling. The method consists of connecting a tubular member to the upper end of a packer having an elastomeric expansive seal element; placing the packer in an upper portion of the marine riser assembly below the diverter system and expanding the seal element against the interior of the upper portion; closing the packer element of the diverter system around the tubular member; and finally applying fluid pressure in the space between the packer element of the diverter system and the seal element of the packer to determine if any leakage in the diverter system exists. The patent also describes an offshore drilling ...
A system and method for installing a fluid flow controller and telescoping spools beneath an offshore bottom supported drilling rig rotary table is disclosed. Upper and lower telescoping spools are provided for initially connecting a Diverter/BOP convertible fluid flow controller between structural casing in the well and a permanent housing beneath the drilling rig rotary table. Clamp means are provided for clamping the rig vent line to an opening in the housing wall of the fluid flow controller during drilling of the borehole through the structural casing in preparation for setting and cementing the conductor casing. In that mode, the system is adapted as a diverter system. After the well is drilled for the conductor casing and the conductor casing is cemented and cut off at its top, a mandrel is fitted at the top of the conductor casing to which the lower end of the lower spool may be connected. The system may be used in this configuration as a diverter system, ...
An offshore drilling rig is described for use in drilling into a formation below a body of water comprising a barge hull having a drilling slot extending inwardly from the peripheral boundary of the barge hull, means for supporting the barge hull in a position above the water, a cantilever structure mounted on the barge hull and movable horizontally with respect to such barge hull, the cantilever structure being so located relative to the drilling slot as to be movable horizontally into a position in vertical alignment with the drilling slot, a derrick and drilling machinery mounted to the cantilever structure and movable into a position above the drilling slot whereby well drilling operations may be conducted through the drilling slot, the cantilever structure also being movable horizontally to a position which locates the derrick and the drilling machinery outboard of the peripheral boundary of the barge hull, whereby a drilling operations may be conducted ...
Objectives~%~~%~The practical exploitation of tidal stream energy is limited by man's activities in coastal waters: navigation, fishing and~%~leisure pursuits. It is important therefore to make the best use of the sites, which are available. The main objective of the~%~Proposed study is to assess the limits imposed by waves on the performance of tidal stream rotors, and to investigate way:~%~in which these limits might be related by refinements in rotor design and the control of openiting conditions. S~%~ [continued...]DescriptionHorizontal aids wind turbines have been recognised as one of the most successful renewable energy saving devices. The use of the similar concept as a 'tidy~%~~%~stream rotor' in offshore environment appears to be even more compelling. However, the application of this concept will require the confirmation of various operational and environmental limitations due to complexities o ...
This article examines the potential threat of marine pollution caused by offshore oil and gas development activities in the disputed areas of the South China Sea (SCS) and the Spratly Islands. After addressing the potential threat of marine pollution, it discusses the legal obligations and political commitment of the SCS littoral states regarding the protection of the marine environment in the area. The role that Taiwan can play in these matters is also examined.
Voestalpine AG (Linz, Austria) produces heavy steel for steam turbines, compressors for the promotion of oil and gas as well as for the chemical industry, mechanical engineering and for the offshore technology. A weight range between 1 and 200 tons can be covered. The author of the contribution under consideration is limited to characteristics which have to be managed by a large steel foundry within the range of the steam power plants. This is described on the basis of produced steam turbines for power stations in the highest performance segment (1,600 MW).
The Marine Technology Society 1994 conference was held in Washington, D.C., September 7-9, 1994. Titled Challenges and Opportunities in the Marine Environment, the conference offered a wide variety of presentations. State-of-the-art technology, government policies and regulations, and environmental concerns were addressed. Offshore mining, coastal zone management, marine engineering, oceanographic research, educational issues, and global climate change were also well represented in the presentations. The conference proceedings are organized around the daily sessions and roughly 70% of the papers are included.
The marine ram-type blowout preventer deployed from an offshore drilling rig has one serious disadvantage, its inaccessibility. A development to promote reliability of the subsea ram-type preventer and reduce the excess running and pulling to charge out rams, is the variable bare ram (VBR). Unlike the standard ram, the VBR has the ability to pack off a range of pipe sizes. Interest in VBR's has been revived and research and development in this equipment goes on at each of three manufacturer's facilities in Houston.
ObjectivesObjectives Not AvailableDescriptionThis proposal seeks to extend what is currently the most comprehensive offshore environmental data collection programme at a platform on the UKGS involving continuous collection of wave height and direction, wind speed and direction, current and wave particle kinematics. Data has been collected with this system since 1994 and the proposal is to extend this until 1999 thus providing an extensive set of storm data collected at 5Hz which will allow examination of the joint behaviour of wave, wind [continued...
The problem of pile groups subjected to lateral loads is of interest particularly in offshore and coastal regions. An understanding of pile-soil interaction is essential in designing such pile foundations. In this paper, a simplified finite element analysis in conjunction with Yegian and Wright approach has been presented to study the behavior of pile groups under lateral loads. The pile is treated as a shear beam and the soil media is assumed to be linear elastic. The results of the analysis are used to estimate: (1) Lateral Group Efficiency and (2) Extent of stress influence around the pile. The results obtained from the theoretical predictions are found to be reasonably in good agreement with the published literature.
A new highly alloyed (Cr, Mo, W, N) super austenitic grade has been developed. This grade offers high mechanical properties combined with excellent corrosion resistance in chloride acid media. This grade is particularly designed for applications in chloride, oxidizing acid media encountered in the chemical, transportation, pollution control, offshore and pulp and paper industries. Mechanical properties, corrosion resistance and weldability of this grade are presented and compared to that of other stainless steels and nickel base alloys.
Organizational risk indicators are proposed as a tool for risk control during operation of offshore installations, as a complement to QRA-based indicators. An organizational factor framework is developed based on a review of existing organizational factor frameworks, research on safety performance indicators, and previous work on QRA-based indicators. The results comprise a qualitative organizational model, proposed organizational risk indicators, and a quantification methodology for assessing the impact of the organization on risk. The risk indicators, when validated, will aid in a frequent control of the risk in the periods between the updating of the quantitative risk assessments.
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.
Oil, in various forms, has been used for thousands of years and has even been recommended as a medicinal product. Starting in the mid-19. century, however, mineral oil production became an economic, political, social and scientific gold mine. Subterranean and offshore drilling rigs have created colossal fortunes among multinationals and made certain nations extremely wealthy. Starting in the 1920's, oil companies began to explore the possibilities of undersea drilling, but it was only in 1947 that the first offshore drilling rig was set up. With three-quarters of the planet covered by water, it was inevitable that oil companies would turn to offshore drilling - especially as sub-sea oil fields may cover as much as 84 million square kilometres. Drilling rigs now go deeper than ever and are able to operate in up to 3000 meters water depth. This paper will present the technical merits of two similar all-electric ...
The Cambro-Ordovician platform was formed along the margin of the old super-continent of Laurentia approximately 470 million years ago, and is a prolific producer of hydrocarbons. This presentation provided a geological review of the region as well as estimates of the amounts of oil in place. A simplified geological cross-section of the formation was presented, as well as a chart of the Anticosti Basin of western Newfoundland. Details of exploration wells targeting the Cambro-Ordovician carbonate platform and current west coast land holdings were provided. An outline of the area's petroleum system included details of source rock, reservoirs, traps and seals and migration and timing. Offshore prospects for the platform were estimated to be in the region of 100 to 200 million barrels. Onshore prospects were estimated to be in the region of 30 million to 150 million barrels. It was noted that limited coverage by onshore seismic data may mean that larger ...
Calls for containers to transport compressed natural gas, and a ship or barge to house some 200 employees in the Terra Nova offshore oilfield while the oil field's floating production, storage and offloading (FPSO) system is undergoing a major overhaul, are attracting attention on Canada's east coast offshore oilpatch. The FPSO is located offshore, 350 km east of St. John's, Newfoundland. Petro-Canada, operators of the FPSO anticipate that by having all required personnel nearby, the total shutdown time for the overhaul could be minimized. The CNG container was designed by Trans Ocean Gas Inc. in response to an invitation by Husky Oil and Petro-Canada, the White Rose field partners. Trans Ocean Gas strongly believes that CNG will become the technology of choice for getting natural gas ashore and to markets from stranded hydrocarbon pools in Atlantic Canada and the rest of the world where pipeline ...
There are over 4,500 petroleum platforms in the north-central Gulf of Mexico. Explosives are commonly used to remove platforms and have the potential to kill nearby sea turtles. From June 1988-June 1990, the authors used aerial surveys to study turtle density and the spatial relationship between turtles and platforms offshore of Louisiana. They sighted 316 turtles most of which (92%) were loggerheads. Seventy-eight percent were sighted just east of the Mississippi River offshore of the Chandeleur Islands. East of the river, turtle densities ranged from 0.92 (winter) to 4.83 turtles/100 sq km (spring). West of the river, annual densities ranged from 0.11-0.50 turtles/100 sq km. East of the river, three statistical tests indicated that turtles were generally closer to platforms than expected by chance alone. West of the river, turtles were randomly located with respect to platform locations. Before explosives are used, current mitigation measures ...
The Lowell Hydroelectric Project (Eldred L. Field) is a key feature of the Departments of Energy's National Low Head Hydroelectric Power Demonstration Program. This report summarizes the Project's Construction which began in October 1983 and was completed in November 1985. It also details project construction costs.
This document presents our proposal to continue the activities of Boston University researchers in eight projects in high energy physics research: Colliding Beams Physics; Accelerator Design Physics; MACRO Project; Proton Decay Project; Theoretical Particle Physics; Muon G-2 Project; and Hadron Collider Physics. The scope of each of these projects is presented in detail in this paper.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
The Atlantic Wind Test Site was established in 1980 as a laboratory to facilitate the evaluation and demonstration of wind energy systems and equipment. This annual report describes its organization and management, facilities, major projects, and the outlook for the future. Major projects include wind diesel; AWTS-IREQ collaboration; remote community data acquisition; lagerwey test program; Alaska Energy Authority Project; public education; Atlantic Orient Corporation 15/50 Project; and the soft VAWT project.
This presentation summarizes the present upgrade R&D projects in the TileCal collaboration. One project studies the possibility to divide the drawers into smaller minidrawers to simplify maintenance. There are three different front-end projects. There are also projects dealing with high voltage and low voltage distribution, projects for developing PMT dividers, low voltage electronics, data transmission and off-detector electronics.
This is the quarterly progress review report for Wolsung NPP 2, 3, 4 NSSS design and engineering which evaluates the performance of project and describes the project highlight, manpower loading status, design and engineering and project related meeting by...
The status of the South American Geocentric reference System (SIRGAS) Project is presented, including the project goals, objectives and tasks already carried out by the Working Groups. (author). 2 refs., 1 fig., 1 tab
...and biological processes acting on recruitment and post-recruitment EU-Agrinet - Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quality indicator ... Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quali EU-Agrinet - Project sheet: Genetic evaluation of European ...
The NASA/DoD Aerospace Knowledge Diffusion Research Project is a cooperative effort sponsored by NASA, Office of Aeronautics, Exploration and Technology (OAET), and DoD, SAF/AQT Deputy for Scientific and Technical Information. The research project is a jo...
The Sunshine Project of Japan was inaugurated in 1974. Since 1980 it has been promoting priority projects such as coal liquefaction. Japan is now promoting the basic and applied research that underpins this development and is increasing the efficiency of technical development. With regard to risk dispersion, the expansion of international cooperation such as the IEA is being promoted.
Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint project prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. It was originally written in English and translated into Japanese with some corrections. (author)
This Fact Sheet presents the mission of the West Valley Demonstration Project and information on the 1994 pollution prevention and recycling accomplishments.
Project methodology, analysis of the occupational and training situation, task analysis process, design process for a systematic training plan specific to the job position are described.
... Materials Research - Major Instrumentation Project (IMR-MIP) program in the Division of Materials ... for materials preparation and characterization essential for researchers studying materials in a ...
A design is proposed for forming the rear screen of a chamber firebox at the point of aerodynamic projection and a design for attaching the pipes of the aerodynamic projection using girders linked with the screen by hinges and movable connections.
Project finance is asset-based financing, meaning that the project lenders have recourse only to the underlying assets of a project. It involves both debt and equity, where the debt-to-equity ratio is typically large (e.g., 70% debt to 30% equity). Debt is used when available and when it is the least expensive form of financing, with equity still needed for credit worthiness. Most important, revenue from the project must be able to generate a return to the equity investors, and pay for interest and principal on the debt, transaction costs associated with developing and structuring the project, and operations and maintenance costs. Successful project financing must provide a structure to manage and share risks in an optimal way that benefits all participants, allocating risks to those entities that are able to mitigate each specific risk, and to share information ...
This comprehensive guide offers several tried and true steps to help you successfully manage the complex process of developing free software. Topics include project management, developer motivation, technical infrastructure to support collaboration, and project promotion. Producing Open Source Software is ideal for developers starting their own free software projects, or people who simply want to participate in the process.
I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.
Climate change and limited primary energy resources require indigenous renewable electricity generation options to change the current coal-dominated power source matrix in China. The wind power is such a solution for the above challenges, and it still has large space for improvement in China. In this paper several critical factors related to Chinese wind power were studied in details, including the wind resources, the wind turbine industry and the policies from the Chinese government. Based on the study, the perspective of wind power in China was discussed. With outstanding advantages, the offshore wind power has a bright future in China, so its main characteristics are discussed. Based on the discussions, suggestions were given to improve the development of Chinese wind power, and the gov...
Climate change and limited primary energy resources require indigenous renewable electricity generation options to change the current coal-dominated power source matrix in China. The wind power is such a solution for the above challenges, and it still has large space for improvement in China. In this paper several critical factors related to Chinese wind power were studied in details, including the wind resources, the wind turbine industry and the policies from the Chinese government. Based on the study, the perspective of wind power in China was discussed. With outstanding advantages, the offshore wind power has a bright future in China, so its main characteristics are discussed. Based on the discussions, suggestions were given to improve the development of Chinese wind power, and the government's further measures are also recommended. (author)
The North-West Borneo Trough is bordered along its south-east margin by a melange wedge that has been the subject of disagreement with insufficient discussion. Offshore Palawan it has been interpreted as an accretionary prism that has been preserved in place when subduction ceased in the Middle Miocene. It is unconformably overlain by undeformed Upper Miocene to Holocene draping strata. Farther south-west along the Trough, the seismically identical melange wedge has been named a Major Thrust Sheet System, which was assumed to have been thrust as a nappe north-westwards over the autochthonous Dangerous Grounds terrane of attenuated continental crust of the South China Sea passive margin. The accretionary prism model is the simplest, resulting in interpretation of the North-West Borneo Troug...
The discovery of large reserves of oil has resulted in a proliferation of drilling and production platforms in the North Sea, and other offshore areas around the UK will probably be developed. The exploitation of marginal oil fields, particularly in those developing countries which have only limited energy resources, has been made possible by the development of a floating production, storage and offloading (f.p.s.o.) unit consisting of a large tonnage oil tanker converted for the purpose and moored. The increased electrical power demands imposed by the addition of process plant, extra accommodation, and so on, usually necessitate additions to onboard generation and distribution systems, which must of course be integrated with the existing equipment.
Abstract Ecosystem processes function at many scales, and capturing these processes is a challenge for ecosystem models. Nevertheless, it is a necessary step for considering many management issues pertaining to shelf and coastal systems. In this paper, we explore one method of modeling large areas with a focus at a range of scales. We develop an ecosystem model that can be used for strategic management decision support by modeling the waters off southeastern Australia using a polygon telescoping approach, which incorporates fine-scale detail at the coastal zone, increasing in scale to a very coarse scale in the offshore areas. This telescoping technique is a useful tool for incorporating a wide range of habitats at different scales into a single model.
This paper addresses the unique structural requirements for successful conversion of tankers for floating production storage and offloading (FPSO) or floating storage and offloading (FSO) service. A description is given of the steps undertaken during two recent and very different conversions of a highly optimized 1980s VLCC to FPSO service, and a typical robust 1970s ULCC to FSO service. The paper describes the steps needed for ensuring the FPSO or FSO requirements are successfully met during conversion of the two tankers - each having its own history, e.g. date of build, original design, material choices, class society, voyage history and repairs. Firstly, the paper describes the procedure and results of an early initial structural assessment procedure on the basis of an American Bureau o...
Pipelines are normally made in low-alloyed steels and the design is based on technical and economical criteria. For the transportation of corrosive fluids, a corrosion evaluation will determine what materials can be used. In the event that stainless steel must be used, investment costs will increase significantly. Use of life cycle cost evaluation may also apply, but we may question how often that is used properly. One must, furthermore, differ between onshore and offshore pipelines, because of differences in pipe laying conditions and in maintenance and repair costs. The consequences of a rupture may differ dramatically between onshore pipelines, too, i.e. a large gas pipeline in a populated area and a small oil pipeline in a nonpopulated area. (author)
The paper seeks to illuminate everyday work practices in the economic spaces of Malaysia's business process outsourcing (BPO) industry. It draws upon empirical evidence from call centre staff and promotes analytical sensitivity to the experience of labour and spatiotemporal relations within the offshore back offices of multinational corporations located in Cyberjaya, Malaysia. The analysis provides an empirical snapshot of how IT-facilitated work practices in the global information economy are embedded and socially reproduced in everyday settings. To this end, the paper engages anthropologically with BPO labour, and critiques -globalist- representations of economic and social transformation frequently articulated through an abstract, dehumanized space of networks and flows often seen to wa...
Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific emergency response planning. ...
In order to improve the working conditions for the operators of drilling rigs, the work area for handling of pipes and tubes is arranged on a main deck convered by a drill deck, which has openings closable by hatch cover panels. The derrick is enclosed in a cover, from which tunnels extend out over the drill deck and comprises lifting means for handling of pipes and tubes between the decks. The tunnels are connected to the cover of the derrick by raised enclosures permitting the swinging of pipes from a horizontal position in the tunnel to a vertical position in the derrick, and vice versa. There is a door, at least at one of the enclosures, permitting handling of especially long objects. Basically, the handling of pipes and tubes can be performed within areas fully protected from the weather.
Maldives comprise some of the most characteristic and significant atoll systems, but the meiobenthic assemblages of these islands are still largely unknown. A study on meiofauna was conducted on three Maldivian sandy back-reef platforms differently exposed to stronger westerly monsoons. Clear high energy effects of the waves causing currents and erosions were observed at the completely exposed and isolated offshore reef of Thoddoo Island. Wave energy of medium intensity was confirmed at Rasdhoo by depositional structures (finolhu), while a medium to low energy level was recorded at Gulhi on the basis of the presence of a low sandy bar. The meiofaunal assemblage counted 17 major taxa. Copepods and nematodes were dominant, followed by platyhelminthes and polychaetes. The nematode assemblage ...
Man's wastes are polluting the oceans from various sources and delivered by various routes. The result has been the loss of habitat and the irreversible altering of marine ecosystems. Development in the coastal zones and offshore activities that disrupt biologically sensitive areas have led to international negotiations to regulate these impacts and develop a law of the sea. Basic to international cooperation, however, is the need to develop answers to questions about the ecological consequences of development programs and the carrying capacity of the oceans. Current information does not demonstrate long-term global impacts, making it difficult to detect and predict incremental changes and causal relationships. Society needs to determine how much environmental damage it will accept and then to develop appropriate technology, such as biomonitoring. Society also needs to reexamine its positions on technology-based regulatory controls to see if the effects of ...
Purpose - The purpose of this paper is to explain some tax management complications for onshore and offshore hedge funds posed by US FIN 48, Uncertain Tax Positions, and to emphasize the hedge fund manager's responsibility for careful tax planning and compliance. Design/methodology/approach - The paper discusses a hedge fund's objective to deliver tax-efficient results to investors, explains the background of FIN 48, and illustrates five types of situations in which conservative auditors following FIN 48 may raise "red flags." Findings - With the advent of FIN 48's standards careful tax planning and compliance are more important than ever for a hedge fund. Significant complications may arise from unwise, tardy, or missed tax elections; filing an IRS Form 8275, Disclosure Statement, stating...
Often oil/gas and other hydrocarbons discovered and produced offshore are transported to onshore facilities via submarine pipelines. The route of such pipelines traverses through coastal/shore approach regions. For a rational/economic design, safe installation and subsequent operation it is of utmost importance to review, evaluate and finalize various environmental hazard such as winds, waves, currents, seabed topography, seabed and sub-bottom soils, seabed erosion and soil accretion. This paper addresses the above described environmental hazards, their assessment and techniques to prepare design parameters which must be used for stability analysis, installation methods, long term operation and maintenance for the shore approaches. Additionally, various proven pipeline installation and stabilization techniques for the shore approach region are detailed. As case histories, three approaches installed in the Dutch North Sea are described.
Abstract We provide the first firm-level evidence of the impact of the trade in producer services (-offshoring-) on the labour market. Using a new data set from the UK that measures trade in services at the firm level, we find no evidence that importing intermediate services is associated with job losses or greater worker turnover. Using regression to control for observable differences between firms that import service inputs and those that do not, we show that firms that start importing intermediate services experience faster employment growth than equivalent firms that do not. This seems likely to be the result of positive demand shocks, which cause a simultaneous increase in employment, output, and use of imported service inputs.
Hydrous pyrolysis of immature Monterey Phosphatic or Siliceous rock at progressively higher temperatures causes systematic changes in biomarker thermal maturity parameters of the generated hydrocarbons. Biomarker ratios based on proposed carbon-carbon cracking or aromatization reactions increase during hydrous pyrolysis along similar pathways for both Siliceous and Phosphatic members. An increase in these biomarker ratios is also observed for oils of increasing thermal maturity from the offshore Santa Maria Basin, although the rates of changes for each parameter differ between the hydrous pyrolysis and natural samples. Changes in some cracking parameters during maturation appear to result from differential thermal stability of the compounds rather than conversion of precursors to products. (author).
Development drilling from Chevron-operated Platform Hermosa, located on OCS-P 0316 of the Point Arguello field, began on January 30, 1987. To date, seven development wells have been drilled in to the northwest-southeast-trending, doubly plunging anticlinal structure. The results from drilling have confirmed the presence of intense folding and fracturing in the targeted Monterey Formation. Over 700 ft of conventional core were recovered from the B-2 well in the lower Sisquoc and Monterey Formations. Analysis of the core material has yielded important information on lithologic variations and fracture patterns in the productive Monterey Formation. Initial results of core studies, DST data, and wireline studies indicate a correlation between rock type and fracturing. Fracture trends and directional permeability suggested by drill-stem testing may affect future drilling patterns in the field.
The total amount of uranium dissolved in seawater at a uniform concentration of 3 mg U/m{sup 3} in the world's oceans is 4.5 billion tons. An adsorption method using polymeric adsorbents capable of specifically recovering uranium from seawater is reported to be economically feasible. A uranium-specific nonwoven fabric was used as the adsorbent packed in an adsorption cage 16 m{sup 2} in cross-sectional area and 16 cm in height. We submerged three adsorption cages in the Pacific Ocean at a depth of 20 m at 7 km offshore of Japan. The three adsorption cages consisted of stacks of 52 000 sheets of the uranium-specific non-woven fabric with a total mass of 350 kg. The total amount of uranium recovered by the nonwoven fabric was >1 kg in terms of yellow cake during a total submersion time of 240 days in the ocean.
The total amount of uranium dissolved in seawater at a uniform concentration of 3 mg U/m3 in the world's oceans is 4.5 billion tons. An adsorption method using polymeric adsorbents capable of specifically recovering uranium from seawater is reported to be economically feasible. A uranium-specific nonwoven fabric was used as the adsorbent packed in an adsorption cage 16 m2 in cross-sectional area and 16 cm in height. We submerged three adsorption cages in the Pacific Ocean at a depth of 20 m at 7 km offshore of Japan. The three adsorption cages consisted of stacks of 52 000 sheets of the uranium-specific non-woven fabric with a total mass of 350 kg. The total amount of uranium recovered by the nonwoven fabric was >1 kg in terms of yellow cake during a total submersion time of 240 days in the ocean.
In recent years, offshore reservoirs have been developed in deeper and deeper water environments. Steel catenary risers (SCRs) are being considered in deepwater development such as Northern North Sea. SCRs used in conjunction with a semi-submersible or floating production, storage and offloading (FPSO) in deepwater harsh environments present significant design challenges. The large vertical motions at the semi or FPSO induce severe riser response, which results in difficulty meeting strength and fatigue criteria at the hang off and touch down point locations. To improve the understanding of SCR behaviour and increase the confidence in the design of such systems in deepwater harsh environments, a parametric study on a SCR connected to a semi-submersible was carried out in this paper to deal...
A new semi-submersible floating structure is proposed on which three wind turbine towers are installed. This paper presents a basic characteristic of the wave-induced motion of this semi-submersible floating structure via. numerical computations and 1/150 scaled rigid model experiments in a wave tank. In the numerical computations, nonlinear damping effect due to drag forces modeled by the Morison's formula is considered in the equation of motion, where the linear hydrodynamic forces are obtained from the Green's function model. As a result, the response characteristics around the resonant frequency region were successfully improved. In addition to such basic examination, major results of feasibility studies, including the structural stability for severe wave conditions and the long-term fatigue limit state, are presented for a realistic situation.
A reduced grid model of a transmission system with a number of central power plants, consumption centers, local wind turbines and a large offshore wind farm is developed and implemented in the simulation tool PowerFactory (DIgSILENT). The reduced grid model is given by Energinet.dk, Transmission System Operator of Denmark (TSO) for Natural Gas and Electricity, to the Danish Universities and the Risoe National Laboratory. Its intended usage is education and studying of interaction between electricity-producing wind turbines and a realistic transmission system. Focus in these studies is on voltage stability issues and on the ride-through capability of different wind turbine concepts, equipped with advanced controllers, developed by the Risoe National Laboratory.
While substantial research has examined the control of information systems (IS) projects, most studies in this area have only examined how one controller manages a single group of controllees. However, many IS projects, especially enterprise systems projects (often initiated by an organization's corporate headquarters, and involving business unit users and consultants), have multiple stakeholders. The corporate headquarters (the project's principal controller) must simultaneously ensure that the various stakeholders are aligned with the project's goals despite their diverse motivations, and that the stakeholders collaborate with each other to achieve project success. Behavior control theory argues that the controller enacts a control portfolio of formal and informal controls. However, the ...
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry`s impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the third ...
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)
The development of new steels is always a challenge for the manufacturer of filler metals. In many cases it is obvious that some properties of the base metal cannot be fulfilled with matching filler metals. In some cases, dissimilar filler metals can solve the problem in some cases, there is no chance to meet the requirements of the base metal (for example yield strengths of new ultra high strength steels). This paper deals with different kinds of new steels and the requirements for the weld metal with examples from motor car industry (Mangan Austenite), crane (Ultra high strength steels), earthmoving machinery (Wear-resistant steels) and offshore (Supermartensitic steels). Specific problems will be discussed and best solutions will be highlighted. These examples make clear that the success of new kinds of steels in the market depends on solving the joining problems of these steels. (Abstract Copyright [2007], Wiley Periodicals, Inc.) [German] Die Entwicklung von ...
In the last two decades the performance of numerical wind-wave models has improved considerably. Several models have been routinely producing good quality wave estimates globally since the mid-1980s. The verifications of wind-wave models have mainly focused on the evaluation of the error of the significant wave height H{sub s} estimates. However, for wave energy purposes, the main parameters to be assessed are the wave power P{sub w} and the mean (energy) period T{sub e}. Since P{sub w} is proportional to H{sub s}{sup 2}T{sub e}, its expected error is much larger than for the single-wave parameters. This paper summarizes the intercomparison of two wind-wave models against buoy data in the North Atlantic and the Mediterranean Sea to select the most suitable one for the construction of an Atlas of the wave energy resource in European waters. A full verification in the two basins of the selected model--the WAM model, implemented in the routine operation of the European Centre for ...
Many features from the background for an intensified application of fracture mechanics concepts in many industries world-wide. These include requirements for a permanent increase of the level of performance of technical components and structures by the introduction of new materials, joining technologies and design principles, the problem of ageing components and life extension, an increased emphasis on non-destructive in-service inspection combined with improved NDT techniques, and also a number of failure events caused by fatigue and fracture The aim of the present paper is to give a brief state-of-the-art review on how fracture mechanics is applied in different industrial branches today. This is based on standards and guidelines in the aerospace industry, in the nuclear and fossil power generation, in the chemical and petrochemical and the pipeline industry, in civil engineering, offshore technique and other fields. Based on the review an outlook is given on a ...
Part I of this thesis is on long-term iceberg collision-risk assessment methods for fixed offshore structures. Estimates for the long-term probability that an iceberg will hit a fixed offshore structure are based on estimates of the total volume of produced iceberg, a model for the size distribution of icebergs and a description of how iceberg trajectories ``fill`` the plane (the ocean`s surface). Part II of the thesis discusses methods for analysis of low resolution data in the sense that the size of the area covered by each pixel is not small compared to the dominating floes. Still, this type of data can provide estimates of the ice extent (and hence the ice edge) and ice concentration. The estimates of the ice edge (at least) seem to be physically significant in the sense that ``in some way`` they can reflect ice drift in an image time sequence. A priori this is far from obvious. A central idea is that the ``ice edge`` is close to a ...
Amoco Trinidad Oil Company produces 60,000 bbl/d of oil from the Trinidadian offshore. The oil is pipelined ashore where it is processed and returned offshore to a buoy mooring for transport up Trinidad's east coast. Amoco Trinidad has developed comprehensive oil spill contingency plans, starting from computer models of spill scenarios. The models used initially assumed that the oils would emulsify quickly and the spills would become highly viscous and persistent, reaching the shoreline in 15-24 h. Such behavior would render ineffective the use of dispersants as a spill countermeasure. Studies showed a poor potential capability of physical recovery systems for spills off the Trinidad east coast due to high sea states, strong winds, and other factors. These results led to questioning of the spill model's assumptions, and laboratory tests were conducted to study the actual behavior of the crude oils. It was found that the oil was difficult to ...
The grey-black mudstones of the Sonehat Formation form part of the Middle Jurassic fill of the Jameson Land Basin in East Greenland. The formation is exposed in the southernmost part of the north south-trending, Mesozoic rift system in East Greenland that was part of the epeiric seaway betaveen East Greenland and Norway. Sedimentological observations of the Sortehat Formation indicate deposition in an offshore marine setting that was typically low energy and periodically oxygen-deficient but was influenced by storm currents on occasion. Detailed palynological studies of the Sortehat Formation have resulted in the definition of theee palynological assemblage zones recognised at four localities, namely Enhjoerningen Dal and Pelion (north Jameson Land), the type section at Sortehat (central Jameson Land) and Albuen at Neill Klinter along Hurry Inlet (south-east Jameson Land). In stratigraphic order, these zones are termed the Botryococcus Assemblage Zone, the ...
Friede and Goldman Ltd. of New Orleans, Louisiana has a successful drilling rig, the L-780 jack-up series. The triangular-shaped drilling vessel measures 180 x 176 ft. and is equipped with three 352 ft legs including spud cans. It is designed to work in up to 250 ft waters and drill to 20,000 ft depths. The unit is scheduled to begin initial drilling operations in the Gulf of Mexico for Arco. Design features are included for the unit. Davie Shipbuilding Ltd. has entered the Mexican offshore market with the signing of a $40,000,000 Canadian contract for a jack-up to work in 300 ft water depths. Baker Marine Corporation has contracted with the People's Republic of China for construction of two self-elevating jack-ups. The units will be built for Magnum Marine, headquartered in Houston. Details for the two rigs are given. Santa Fe International Corporation has ordered a new jack-up rig to work initially in the Gulf of Suez. The newly ordered unit, Rig 136, ...
Field studies were conducted May 28-June 1, 1979, to determine the chemical composition and physical behavior of discharges from an offshore gas drilling rig in the central basin of Lake Erie. The drilling operation was observed for four days, from rig jackup to the circulation of mud through the borehole after drilling had been completed. Resuspension studies using nephelometry, supplemented with chemical analyses, indicated little resuspension of lake bottom materials or release of metals to the water column during rig jack-up. Portions of the turbidity plumes generated during drilling were buoyant. Three surface turbidity plumes were mapped with nephelometry to a point at which particulate concentrations reached background levels in the Lake. Detectable plumes were approx. 400 to 1500 m in length and had maximum widths < 230 m. A chemical survey conducted in the plume during early gas shows indicated that discharged inorganic chemical species were rapidly ...
Reinterpretation of the South Florida basin reveals that it was a keep-up carbonate shelf during the Lower Cretaceous. Until the Cenomanian, it was connected to the Bahamas and the Cay Sal Bank north of Cuba. The Cenomanian sea level rise was at least partially responsible for the formation of the Florida Straits, isolating the platform. The combination of an abrupt worldwide rise in sea level and subsidence caused the South Florida platform to founder, ending shallow-water and evaporitic sedimentation over the majority of the shelf. The Cay Sal and Bahamian platforms remained as active shallow shelves separated by the Old Bahamas Channel. The Lower Cretaceous sediments are characterized by shallow shelf limestones, dolomites, and evaporites (mostly anhydrite). The evaporite-rich sections, originally thought to represent basinal facies, are reinterpreted as supratidal to shallow subtidal evaporites, based on examination of core and cuttings. Influx of normal marine waters over rudist ...
One of the challenges facing Clean Development Mechanism (CDM) projects today is their limited ability to secure financing for the underlying greenhouse gas emission reduction activities, particularly in the least developed countries. Among the key reasons for this is the fact that most financial intermediaries in the CDM host countries have limited or no knowledge of the CDM Modalities and Procedures. Moreover, approaches, tools and skills for CDM project appraisal are lacking or are asymmetrical to the skills in comparable institutions in developed countries. Consequently, developing country financial institutions are unable to properly evaluate the risks and rewards associated with investing or lending to developers undertaking CDM projects, and therefore have, by-and-large, refrained from financing these projects. In addition, some potential project proponents lack experience in ...
The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.
We combine data from the Latin American Migration Project and the Mexican Migration Project to estimate models predicting the likelihood of taking of first and later trips to the United States...Full Text Available
The energy strategy of the UK Overseas Development Administration is outlined with specific emphasis on energy efficiency and renewable energies. Based on 29 case studies concerning projects and programmes in both developed and developing countries, critical success factors for renewable energy projects are identified. UK)
It has been of interest whether and when the rearrangement of neuronal circuits can be induced after projection patterns are formed during development. Earlier studies using cats reported that the rearrangement...Full Text Available
... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... ...
Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)
million for advanced energy projects Thu, Sep 29, 2011 - Project Aims to Bring Bio-based Jet Fuel Production to the Northwest Mon, Sep 12, 2011 - Drive like the wind Thu, Aug 25,...
This quarterly update contains information on the National Bioenergy Center Biochemical Platform Integration Project, R&D progress and related activities.
... Highly-Functional Materials" was launched in JFY1996 under the New Materials field. This project was ... Bio-mimetic materials" (1) Advanced stimuli responsive materials (2) Harmonized molecular materials ...
Phase 2 of the four phase NASA/DoD Aerospace Knowledge Diffusion Research Project was undertaken to study the transfer of scientific and technical information (STI) from government to the aerospace industry and the role of librarians and technical informa...
...PROJECTS We are funded by industry, public bodies, charities and research councils and we are proud of the research projects undertaken by our world-class research groups . Research News To read more about our latest research to hit the media go to our News & Events page ...
As the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program initiates new cost-shared solar energy R&D under the Solar America Initiative (SAI), it is useful to analyze the experience gained from cost-shared R&D projects that have been funded through the program to date. This report summarizes lessons learned from two DOE-sponsored photovoltaic (PV) projects: the Photovoltaic Manufacturing Technology/PV Manufacturing R&D (PVMaT/PVMR&D) project and the Thin-Film PV Partnership project. During the past 10-15 years, these two projects have invested roughly $330 million of government resources in cost-shared R&D and leveraged another $190 million in private-sector PV R&D investments. Following a description of key findings and brief descriptions of the PVMaT/PVMR&D and Thin-Film PV Partnership ...
This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005
...October 2006 - present: University of Leeds, UK PhD Candidate in Geochemistry Thesis Title: Magnetite formation in reducing natural environments Supervisors: Dr Liane G. Benning ...Germany Bachelor of Science in Geosciences and Astrophysics Project Details Project Title: \\
funded these sensors as the first Discovery Mission of. Opportunity, part of the ... aboard a Russian Soyuz rocket. .... the Swedes on other projects, mainly sounding rocket projects. ..... incoming applications for the Fellowship Program, fielding ...
In summer 2000, the Cushing/Whitney Medical Library at Yale University began a demonstration project to digitize classic articles in neurosurgery from the late 1800s and early 1900s. The objective of...Full Text Available
The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a ren...
Objective: The paper describes and evaluates the use of Clinical Digital Libraries Project (CDLP) digital library collections in terms of their facilitation of timely clinical information...Full Text Available
The ''biotechnology 2000'' project is supervised by the project sponsor ''biology, energy, ecology'' at Forschungszentrum Juelich on behalf of the Federal Ministry for Research and Technology. The project activities cover the development of techniques and methods, cell biology, gene structure and gene regulation, photosynthetic production processes, biological hydrogen production, synthetic biology, protein design, neurobiological research, biosystems, plant breeding, phytomedicine and plant protection, the biology of waste disposal methods, research into methods which replace animal experiments, biological safety research, technology risk assessment, and ethical aspects. A general survey introduces the promoted projects, and standardized data sheets briefly introduce the individual activities. The appendix gives the ...
This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.
... due to the evolving nature of the Strategy Maps and the changing priority roles, it was decided not to link the SMSP directly with any Strategic Plans. ...
This forum showcases the work of a variety of different heritage-based centers, organizations, and projects dedicated to research, education, and preservation of tangible and intangible forms of cultural heritage. The descriptions of these centers demonstrate the diversity of heritage work being done today. The centers and projects described in the forum vary in their contexts, missions, and outcomes. Highlighted in the forum are preservation organizations, university-based heritage centers, and a global collaborative cultural heritage project. Each organization in the forum provides information about their missions and goals, their approaches or methods to heritage work, and a brief description of some of their initiatives.
... Title : Refining the Magnetic Forming Capability. ... Abstract : The purpose of this project was to refine the in-house magnetic forming capability. ...
One of the essential steps in the main scope Project Management is the Time Management made by the planning and control of the project schedule. In this work is presented the resource constrained scheduling problem beyond its mathematical formulation and a review of papers about this issue. In sequence is presented a practical example of this model considering a simplified model of an engineering project schedule of oil production equipment. The results obtained with the model application are shown and the conclusions about the work with resource constrained scheduling problems. (author)
The projects described in this report represent the Laboratory's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides, a) a director's statement, b) an overview of the laboratory's LDRD program, including PNNL's management process and a self-assessment of the program, c) a five-year project funding table, and d) project summaries for each LDRD project.
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
...Development of an Agroforestry Sequestration Project in Khammam District of India | International Energy Studies International Energy Studies News | Researchers | Publications ...Technologies Division Industrial Innovations Industrial Energy Analysis Copyright &1692006 Disclaimer Development of an Agroforestry Sequestration Project in Khammam District of India Authors:P. Sudha; V.... Vasistha 2006-10-10 0 Development of an Agroforestry Sequestration Project in Khammam District of India P. Sudha, V. Ramprasad, M.D.V. Nagendra,...
The first objective is to utilize reservoir characterization and advanced technologies to optimize the design of a carbon dioxide (CO{sub 2}) project for the South Cowden Unit (SCU) located in Ector County, Texas. The SCU is a mature, relatively small, shallow shelf carbonate unit nearing, waterflood depletion. The second objective is to demonstrate the performance and economic viability of the project in the field. This report includes work on the reservoir characterization and project design objective and the demonstration project objective.
This article describes the steps taken to mitigate the impact to existing wetlands by creating new wetlands in an airport expansion project. The project addressed maintaining suitable amounts of wetlands to accommodate peak waterfowl populations, moving of high voltage power transmission towers, and maintaining agricultural and hunting interests. This project involved recreating of open water areas, marsh habitat, mud flat habitat, saline meadow habitat, maintaining two existing wetlands in the area of the new wetlands without disturbing them, and improving upland habitat surrounding the new wetlands.
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the ...
A project to demonstrate residential heating and cooling with a well-water source heat pump is documented. The system is schematically illustrated and described, and project experience is discussed. The system is capable of using source water as cool as 40/sup 0/F. Project expenses are accounted for. (LEW)
This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.
The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.
DescriptionThis project is part of the BBSRCs special initiative on plant and microbial metabolomics. The project will primarily focus on the trichothecene mycotoxin producing Ascomycete fungus Fusarium graminearum (Fg) which causes ear blight disease of small grain cereals. The project aims to explore the metabolome of various wild-type and single gene deletion Fg strains and to compare some of these with the identical gene mutation in the budding yeast, S. cerevisiae (Sc) and the saprophytic filamentous [continued...
This project is designed to establish one basis for empirically linking aspects of management and organizational design to the safe operation of nuclear power plants. Current work is focusing on (a) reviewing existing literature relevant to this linkage, and (b) isolating and incorporating numerous safety relevant indicators. Later stages of this project will involve hypothesis development, data collection and analysis.
The Coordinated Research Project is a topical collection of research agreements and contracts. The research contracts are awarded with financial support of about 10-20% of the total contract cost. Among the activities of the project is the organization of consultant group meetings and workshops involving several international experts and representatives of users and developers of border radiation monitoring equipment. The project also supports in coordinating the development of equipment and techniques for up-to-date border monitoring and in establishing of a process for providing nuclear forensics support to member states
Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.
Daya Bay Nuclear Power Station is the largest joint-venture project which is also the largest commercial nuclear power plant currently under construction in China mainland. Organized and executed strictly in accordance with international standards, the Daya Bay project is seen as the first step taken by China in the development programme of large-capacity commercial nuclear power units.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
Biofuels may contribute to both rural economic development and climate change mitigation and adaptation. The Gota Verde Project in Yoro, Honduras, attempts to demonstrate the technical and economic feasibility of small-scale biofuel production for local use by implementing a distinctive approach to feedstock production that encourages small farm sizes, mixed cropping of biofuel feedstock from Jatropha and food crops, particularly corn and beans, grown side by side on the same farmland and the total involvement of small rural farmers. But is the project sustainable? Using EC-Assess, the Earth Charter ethics-based assessment tool, to assess the sustainability of this project, the author found that in some assessment categories the actions surpassed the intended objectives, showing that the project was achieving certain Earth Charter goals without specifically stating its intention to address them. ...
In the context of the LHC Computing Grid (LCG) project, the Applications Area develops and maintains that part of the physics applications software and associated infrastructure that is shared among the LHC experiments. The "Physicist Interface" (PI) project of the LCG Application Area encompasses the interfaces and tools by which physicists will directly use the software, providing implementations based on agreed standards like the AIDA interfaces for data analysis. In collaboration with users from the experiments, work has started with implementing the AIDA interfaces for (binned and unbinned) histogramming, fitting and minimization as well as manipulation of tuples. These implementations have been developed by re-using existing packages either directly or by using a (thin) layer of wrappers. In addition, bindings of these interfaces to the Python interpreted language have been done using the dictionary subsystem of the LCG-AA/SEAL ...
SummaryPrimary visual cortex recombines inputs from magnocellular (M) and parvocellular (P) streams to create functionally specialized outputs. Understanding these input-output relationships is complicated by the fact that layer 4B, which provides outputs to dorsal visual areas, contains multiple cell types. Using a modified rabies virus that expresses green fluorescent protein, we show that layer 4B neurons projecting to MT are a majority spiny stellate, whereas those projecting to V2 are overwhelmingly pyramidal. Regardless of cell type, MT-projecting neurons have larger cell bodies, more dendritic length, and are deeper within layer 4B. Furthermore, MT-projecting pyramidal neurons are located preferentially underneath cytochrome oxidase blobs, indicating that MT-projecting neurons of bo...
The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.
For pt.I see ibid., vol.516, p.426-48, 1998. Manifest N=2 supersymmetric hypermultiplet mass terms can be introduced in the projective N=2 superspace formalism. In the case of complex hypermultiplets, where the gauge covariantized spinor derivatives have an explicit representation in terms of gauge prepotentials, it is possible to interpret such masses as vacuum expectation values of an Abelian vector multiplet. The duality transformation that relates the N=2 off-shell projective description of the hypermultiplet to the on-shell description involving two N=1 chiral superfields allows us to obtain the massive propagators of the N=1 complex linear fields in the projective hypermultiplet. The N=1 massive propagators of the component superfields in the projective hypermultiplet suggest a possible ansatz for the N=2 massive propagator, which agrees with an explicit calculation in N=2 superspace. (orig.).
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada submitted a Development Application (DA) to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) for the White Rose Development. This DA was prepared following the Canada-Newfoundland Atlantic Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act. In December 2001, the C-NLOPB approved the White Rose DA. This document outlined a proposed amendment to the original Development Plan involving an expansion of its White Rose Development in the Jeanne d'Arc Basin on the Grand Bank. The expansion will consist of a subsea tie-back to the Floating Production, Storage and Offloading (FPSO) vessel through the existing Southern Glory Hole (SGH) and utilizing a new glory hole constructed approximately 4 km south of the SGH. The document presented an overview of the development; geology, ...
At the Huizhou oil field in China the FPSO Munin of Bluewater completely relies on five computer controlled propulsion screws to position itself, a so-called Dynamic Positioning (DP) system. In this article report is given of training given to the crew of the FPSO Munin. A floating production, storage and offloading (FPSO) unit is a floating vessel used by the offshore industry for the processing and storage of oil and gas. [Dutch] Op het Huizhou oileveld in China vertrouwt de FPSO (floating production, storage and offloading unit) Munin van Bluewater uitsluitend op een vijftal computergestuurde voorstuwingsschroeven om zichzelf in positie te houden, een zogenaamd Dynamisch Positionering (DP) systeem. In dit artikel wordt verslag gedaan van en uitleg gegeven over trainingen die zijn gegeven aan de bemanning van de FPSO Munin.
The deep water parts of the Moere and Southern Voering Basins are large frontier areas, which are considered to contain significant undiscovered hydrocarbon resources, within Cretaceous and Paleogene reservoirs. PGS Reservoir AS have evaluated the Cretaceous and Paleogene successions of the shallow and deep water areas offshore Mid-Norway using high-resolution sequence stratigraphic techniques. The successions have been subdivided into about 20 stratigraphic sequences. The results are: (1) A more acurate and higher resolution stratigraphy, (2) Greater constraints on basin palaeoenvironmental and palaeogeographic reconstructions, (4) Fully integrated sandstone fairway models, with increased ability to reservoir and seal quality and continuity, (5) In addition to several obvious giant domal traps, subtler yet significant structural and stratigraphic leads and prospects can be identified, (6) The timing, volume and phase of hydrocarbon generation may be estimated more ...
The National Survey and Cadastre - Denmark (KMS) has for several years produced gravity anomaly maps over the oceans derived from satellite altimetry. During the last four years, KMS has also conducted airborne gravity surveys along the coast of Greenland dedicated to complement the existing onshore gravity coverage and fill in new data in the very-near coastal area, where altimetry data may contain gross errors. The airborne surveys extend from the coastline to approximately 100 km offshore, along 6000 km of coastline. An adequate merging of these different data sources is important for the use of gravity data especially, when computing geoid models in coastal regions. The presence of reliable marine gravity data for independent control offers an opportunity to study procedures for the merging of airborne and satellite data around Greenland. Two different merging techniques, both based on collocation, are investigated in this paper. Collocation offers a way of ...
The report outlines the role of the IEA Greenhouse Gas R and D Programme, gives details of participants and of publications and summarises achievements of 1998. A successful conference on Greenhouse Gas Control Technologies was held in Interlaken, Switzerland. Technical studies reported include novel power generation concepts for removing carbon dioxide prior to or after combustion, using seawater for CO{sub 2} capture, investigating carbon dioxide sequestration in conjunction with enhanced coalbed methane recovery and applying retrofitting to power plants and to offshore oil and gas platforms. Systems studies taking a broader view include investigating the potential for combined energy systems (power generation with district heating, power with district cooling etc.) to reduce CO{sub 2} abatement cost, studies on the LNG/power generation fuel cycle, assessing the potential of methanol as an energy carrier investigating methods of making natural gas usable by the ...
High-resolution sequence stratigraphy concepts are applied to Erema, a Miocene onshore field of the Niger delta. The field's production is decreasing and an up-to-date geological model is essential to monitor the production. We aim to show an approach, using subsurface data and sequence stratigraphic concepts, which results in a time-line (Maximum Flooding Surfaces) correlation scheme. This scheme is based upon a facies model and is destined to guide the study of the characterization of reservoir heterogeneities. Using the cored well as a reference point, the facies model consists of shoreface dunes (planar tabular cross-stratified sandstones) changing landward into fluvial distributary deposits (through cross-stratified sandstones) via a tide-influenced coastal plain facies. The stacking pattern of genetic units shows a seaward stepping phase at the reservoir scale (sixty metres thick) with an abrupt deepening at the top of the reservoir. The proposed geological scheme, at ...
The Sunoco Felda oil trend of the South Florida basin has been a prolific oil producer. All the oil is produced from the Cretaceous Sunniland formation, a leached limestone bioherm. Although the producing section has been considered reefal in the literature, petrographic and biostratigraphic analyses of various cores in producing fields have determined that these deposits are composed of particles of fragmented rudist and other fauna deposited in a tidal shoal. Atop this debris an algae and gastropod section has been deposited, typical of a mound deposited on a tidal mud flat. This model is exemplified in the Sunoco Felda and West Sunoco fields and was used in exploring the Sunoco Felda trend. From the petrological analysis of these two fields and from knowledge of other wells in the basin, biostratigraphic and lithologic trends can be determined and extended offshore into the eastern Gulf of Mexico. The author stresses petrology in exploring the Sunniland ...
The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department ...
The success in developing of the oil industry operating in offshore-onshore terminals, connected by pipelines with the facilities of the coastal zone, can be attributed partially to the beach morpho dynamic monitoring. This study represents a solution to the concerns of the technical operations in coastal zones because it minimizes the impact of the petroleum production and it assures the environmental protection associated to the risks of the pipelines breaking. This impact type results mainly of the vertical and horizontal displacements of the beach, from the coastal dunes to the shore face. The mobility of the profile is associated to the magnitude of the sedimentary processes, which reproduce naturally or not, in scale of time that can vary among few days, years or decades. For the monitoring and interpretation of the beach profile mobility the following methods are recommended: calculation of the closure depth with base in the wave data; bathymetric survey ...
This patent describes a system adapted for alternative use as a diverter or a blowout preventer for a bottom supported drilling rig and adapted for positioning beneath a rotary table of the drilling rig, the system comprising: a fluid flow controller having a controller housing with a lower opening and an upper opening and a vertical flow path therebetween and an outlet passage provided in its housing wall, and at least two bases. A method is described for installing a system adapted for alternative connection as a diverter or a blowout preventer for a bottom supported drilling rig positioned beneath a rotary table of the drilling rig after structural casing has been set in a borehole. The method comprises: positioning a first telescoping spool having a lower end and an upper end below the rotary table, the first spool having a first base disposed at its upper end, the first base having a port disposed in its wall; aligning a fluid flow controller having a controller housing wall ...
Recent data from the northwest Gulf of Alaska reveal a coastal current which flows westward along the Kenai Peninsula (mainly within 30 km of shore), enters Shelifof Strait, and exits to the southwest of Kodiak Island. This flow, which we call the Kenai Current, has a large seasonal variation in baroclinic transport and maximum surface speed; transport is typically about 0.3 x 10/sup 6/ m/sup 3//s but exceeds 1.0 x 10/sup 6/ m/sup 3//s in fall, with concurrent speed increases from 15--30 cm/s to over 100 cm/s. The coastal flow is clearly distinct from the offshore Alaskan Stream; its seasonal signal is mainly related to a cross-shelf pressure gradient, which responds to an annual hydrological cycle. Current records from Shelikof Srait substantiante the presence of an annual signal and indicate that wind forcing has maximum effect from December through February, but it does not appear to augment flow at other times.
Pile foundations in several coastal and offshore structures are subjected to significant amounts of lateral loads due to wave action. Usually batter piles are adopted to resist large lateral loads. In this investigation an attempt has been made to study the behavior of batter pile in clayey soils through an experimental program carried out on instrumented model aluminium piles of 26 mm diameter in a test tank of size, 1,200 mm x 800mm x 1,100 mm. The pile was instrumented with electrical resistance type strain gauges to determine the bending moment variations along the depth of embedment of pile. Bending moment vis depth relationships were used to determine the Soil reaction (p) and lateral displacement (y) along the length of the pile for the applied load. From the bending moment vs depth curves it is found that depth of maximum bending moment is greater for negative batter pile than for vertical and positive batter pile. The data of soil reaction and lateral ...
The European demonstration project Hip Hip (house integrated photovoltaic high-tech in public) led the French photovoltaic market to reach a level comparable to those of the other European countries in terms of relevance of implemented solutions and costs. This document presents the best realizations and the experience gained through the Hip Hip project. Its aim is to convince the designers and managers of building projects of the advantages of photovoltaic installations integrated to the structure and connected to the power distribution grid: 1 - presentation of the technology; 2 - status of the Hip Hip demonstration project (goals, results: main innovations and impact on the French market); 3 - different possibilities of integration to the building structure; 4 - examples of projects realized in France in the framework of the Hip Hip project: integration in ...
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry's impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the third ...
The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report ...
The Fifteenmile Basin Habitat Improvement Project is an ongoing multi-agency effort to improve habitat in the Fifteenmile drainage and increase production of the depressed wild, winter steelhead run. Cooperating agencies include the Oregon Department of Fish and Wildlife, USDA Forest Service. USDA Soil Conservation Service and Bonneville Power Administration. in consultation with the Confederated Tribes of Warm Springs. The Oregon Department of Fish and Wildlife is administering project work on state and private lands and the U.S.D.A. Forest Service is administering project work on National Forest land. Project work on the Forest has been sub-divided into four components; (1) Ramsey Creek, (2) Eightmile Creek, (3) Fifteenmile Creek, and (4) Fivemile Creek. Forest Service activities in the Fifteenmile basin during 1988 involved habitat improvement work on Ramsey Creek, continuation of physical and ...
The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the ...
The leading environmental problem facing coastal Louisiana regions is the loss of wetlands. Oil and gas exploration and production activities have contributed to wetland damage through erosion at numerous sites where canals have been cut through the marsh to access drilling sites. An independent oil and gas producer, working with Southeastern Louisiana University and two oil field service companies, developed a process to stabilize drill cuttings so that they could be used as a substrate to grow wetlands vegetation. The U.S. Department of Energy (DOE) funded a project under which the process would be validated through laboratory studies and field demonstrations. The laboratory studies demonstrated that treated drill cuttings support the growth of wetlands vegetation. However, neither the Army Corps of Engineers (COE) nor the U.S. Environmental Protection Agency (EPA) would grant regulatory approval for afield trial of the process. Argonne National Laboratory was ...
DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current ...
One of the aims of SILMU, the Finnish Research Programme for Climate Change, was to produce information for decision-makers concerning climate change and its mitigation. One integrative project for this purpose was PAATE, an inquiry into the present state and future possibilities of interaction between researchers and decision-makers. The aims of the PAATE project can be summarised as follows: (1) to conduct a survey of the state of climate change research and climate policy in Finland, (2) to develop the interaction between climate research, policy makers and different societal organisations, (3) to acquire methodological experiences on the realisation of projects of this type, (4) to provide material for the final report of the SILMU project and for further action, and (5) to promote the rational development of climate policy. Methodologically, the PAATE project used the Delphi ...
This report contains the proceedings of the NKS-B Summary Seminar held on 24-25 October 2005 in Tartu, Estonia. The aim of the seminar was to provide a forum for presenting and discussing the results obtained in the NKS-B programme during the project period 2002 - 2005. The main attention was focused on radioecology and measurement techniques including presentations on the work done in the Projects INDOFERN (New Indicator Organisms for Environmental Radioactivity), LABINCO (Intercomparison of Laboratory Analyses of Radionuclides in Environmental Samples) and ECODOSES (Improving Radiological Assessments of Doses to Humans from Terrestrial Ecosystems). The total number of presentations in the seminar was 27. The seminar was also the final seminar of the four-year INDOFERN Project. The objective of the project was to identify new indicator organisms and biomarkers for assessment of environmental ...
Work at Institutt for energiteknikk (IFE) comprises both nuclear and non-nuclear activities. The main nuclear program is centered on the Halden Reactor Project. In 1958, the first Halden Reactor Project Agreement was signed by organisations representing 12 European countries. During 1994 France became a full member and associate membership was established with Russia. Accordingly, 16 countries were participating in the Project by the end of the year. The objectives have evolved from being simply a demonstration of the operation of a boiling heavy-water reactor to becoming a substantial research and development programme covering the domains of human-machine interaction, fuel behaviour, materials testing, water chemistry, and instrumentation. In 1994, significant progress was achieved in all of the areas addressed by the project, including the re-instrumentation of irradiated fuel rods, fission gas ...
The primary objective of this project is to enhance domestic petroleum production by demonstration and technology transfer of an advanced oil recovery technology in the Paradox basin, southeastern Utah. If this project can demonstrate technical and economic feasibility, the technique can be applied to approximately 100 additional small fields in the Paradox basin alone, and result in increased recovery of 150 to 200 million barrels of oil. This project is designed to characterize five shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation and choose the best candidate for a pilot demonstration project for either a waterflood or carbon dioxide (CO{sub 2}-)flood project. The field demonstration, monitoring of field performance, and associated validation activities will take place in the Paradox basin within the Navajo Nation. The results of this ...
Taiwan has completed a very successful five-year industrial waste minimization (IWM) demonstration and promotion project sponsored by the government. From 1990 to 1995, the project successfully disseminated the IWM concept of pollution prevention (P2) to industries. It effectively reduced industrial waste while significantly benefitting the economy by assisting industries in implementing in-plant IWM programs. In July 1995, the second stage of the five-year IWM and ISO 14000 promotion project was initiated for further promoting the IWM, P2, and cleaner production and, in particular, coping with the upcoming international environmental management standards (ISO 14000). To assist industries in establishing an environmental management system (EMS) and accumulating related experience, an EMS pilot demonstration project of five model industries and an ISO 14001 EMS demonstration and promotion ...
The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational ...
GAO's review of the H-Coal and Exxon projects showed inadequacies in DOE's contracting practices and a failure by DOE to properly plan, manage, and monitor, especially the H-Coal project. The initial Government-industry H-Coal agreements regarding the level of investment by private sponsors and the ceilings imposed on sharing in cost growth were imbalanced. Larger investments by private sponsors and sharing of cost growth provides an incentive to private sponsors to control costs and helps to assure that each party is fully committed to the success of the project. DOE started the H-Coal project prematurely before sufficiently detailed designs were available and without adequate project planning for functions such as construction scheduling, materials handling, inventory systems, and quality control. DOE staffing was inadequate at both projects ...
'The primary objective of this research project is to acquire a deeper fundamental knowledge of acoustic cavitation and cavitation chemistry, and in doing so, to ascertain how ultrasonic irradiation can be more effectively applied to environmental problems. Four on-going projects will be described in this progress report, The first project is the destruction of carbofuran in a Near-Field Acoustical Processor (NAP), and the hydrodynamic characterization of the reactor. The second project is a comprehensive study of how ultrasonic frequency influences sonochemical reaction rates; the substrate it, the preliminary portion of this study has been hydrogen peroxide formation. The third project in progress is destruction of four polychlorinated biphenyls at 20 kHz. Work so far has been at 20 kHz, but the most significant portion of this project will involve a ...
SummaryInitial results from the use of activated dolomite from QUESTOR project L1 have proved extremely encouraging in terms of metallic ion (also phosphate, nitrate and dye) removal from wastewater, with capacities in some instances in excess of commercially available activated carbons.This new project involves investigating actual plant effluent in laboratory scale columns and the design of a pilot scale rig for on site trials. The project also involves investigating disposal options and an economic [continued...
The purpose of the project was to evaluate the potential influence of global warming on the Finnish economy and well-being during the next 50 to 100 years. In order to achieve this goal a cost-benefit analysis was conducted which produced a quantitative estimate of the economic and partially non-economic effects of the climate change projected to happen in Finland. The analysis utilised the natural scientific evidence produced by other SILMU projects in partial sector models. Also a broader view of the phenomena and the possibilities for restricting greenhouse gas emissions was briefly discussed and surveyed. Two of the more important side-goals were to develop the methodology for country analysis and study the possibilities for adaptation
Using the past diffusion trends of four renewable energy technologies for irrigation water pumping in India (SPV pumps, windmill pumps and biogas/producer gas driven dual fuel engine pumps), results of an attempt to project their future dissemination levels, have been presented in this study. The likely contribution of the renewable energy options considered in the study to the projected energy demand for irrigation water pumping in India has been estimated. Estimates of the associated investment requirements taking into account the learning effect have also been presented. (author)
The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.
The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D&D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the {open_quotes}devil you know{close_quotes} than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies.
The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.
The Austrian sugar industry has developed a project for the manufacture of alcohol that is geared to the conditions in that country and is based on sugar beet as raw material. An alcohol production plant could be integrated in a sugar factory and operate all the year round at a capacity of 120,000 l/d. In this factory, the fermentation raw material would be in the form of green syrup (also thick juice if the need arose) and would be supplied from other sugar factories operating without molasses. The vinasse is to be concentrated and used or burnt. The project provides new possibilities for agriculture, and the sugar industry expects an improvement in plant utilization and a diversification.
Purpose: Assess the feasibility of using NASA satellite data to monitor persistent saltwater intrusion in coastal marshes. End User: USGS National Wetlands ...
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)
Challenges of robotic cars, sponsored by the Defense Advanced Research Projects Agency (DARPA) of the U.S. Defense Department. Carroll Cordes, recently retired USGS branch chief,...
Summary We describe the initiation and establishment of The University of Zambia - University College London Medical School (UNZA-UCLMS) Research and Training Project, an entirely African scientist-led, south-north partnership. In its 16 year existence, the project, by successfully obtaining competitive grant funding, has transformed itself into one of Africa's most productive African-led R&D programmes with training and visible research outputs. The project serves as a role model and now networks R&D and training activities with six southern African (10 institutions) and six European countries. This project case study illustrates that deep commitment is essential for success and that the factors which facilitate success in R&D in Africa need to be evaluated. The long-term prospects for su...
Energy projects are extremely capitalistic and the costs involved have a significant weight on the balance sheets of companies. This paper describes the general rules of financing policies used by companies from the natural gas and petroleum industries: constraints (external and financial markets, partnership, warranties..); implication of financiers; risk analysis (political (nationalization, civil or military troubles, difficult transfer of profits outside the project..), financial (property developer, nature of the project, delay, cost overruns, performance, market..)); financial instruments (proper funds and debt, bankers and insurers, loans etc..). These rules are illustrated with several examples of recent projects of gas pipelines and exploitation of oil fields abroad. (J.S.)
The book tries about the International and national aspects, natural gas situation, production, consumption, prices, demand projection, energetic plans, norms and laws of the natural gas in Colombia
Three companies--Amerada Hess Ltd., Shell Expro (a 50/50 joint partnership between Shell and Esso) and Texaco--have joined forces in a project that will combine their expertise. The Triton project will allow three fields (Bittern, Guillemot West and Gullemot Northwest) to be developed simultaneously using subsea technology, with the wellheads on the seafloor and 68 miles (110 km) of flowlines taking oil and gas produced from the fields to a central floating production storage and offloading (FPSO) vessel. These fields are located in the central area of the North Sea, about 118 miles from Aberdeen in 295 ft of water. The paper discusses the development of the fields, subsea technology, technical challenges, laying the pipeline, and project completion.
In the context of the LHC computing grid (LCG) project, the applications area develops and maintains that part of the physics applications software and associated infrastructure that is shared among the LHC experiments. The "physicist interface" (PI) project of the LCG application area encompasses the interfaces and tools by which physicists will directly use the software, providing implementations based on agreed standards like the analysis systems subsystem (AIDA) interfaces for data analysis. In collaboration with users from the experiments, work has started with implementing the AIDA interfaces for (binned and unbinned) histogramming, fitting and minimization as well as manipulation of tuples. These implementations have been developed by re-using existing packages either directly or by using a (thin) layer of wrappers. In addition, bindings of these interfaces to the Python interpreted language have been done using the dictionary subsystem ...
Oct 2, 2007 ... Other payloads included the Orbiter Experiments Autonomous Supporting Instrumentation System-1 (OASIS-1), a cooling system designed for ...
This document presents a summary of the work performed in support of the Buried Waste Robotics Program Subsurface Mapping Project. The project objective was to demonstrate the feasibility of remotely characterizing buried waste sites. To fulfill this objective, a remotely-operated vehicle, equipped with several sensors, was deployed at the Idaho National Engineering Laboratory. Descriptions of the equipment and areas involved in the project are included in this report. Additionally, this document provides data that was obtained during characterization operations at the Cold Test Pit and the Subsurface Disposal Area, both at the Idaho National Engineering Laboratory's Radioactive Waste Management Complex, and at the Idaho Chemical Processing Plant. The knowledge gained from the experience, that can be applied to the next generation remote-characterization system, is extensive and is presented in this report.
This report updates the status of 32 large projects having EPRI authorizations of $5 million or more. It also describes 86 smaller projects that have EPRI authorizations of less than $5 million and that have a high likelihood of producing a utility-useful new near-term accomplishment within the next two years. Finally, there are 45 examples of analytical, experimental and bench-scale projects that were influential in confirming or redirecting EPRI's research program. These examples cover the entire spectrum of electric R and D: (1) fuel processing, (2) electric power generation, (3) transmission and distribution, (4) energy storage and management, (5) energy analysis, and (6) environmental assessment and control.
ObjectivesTo improving the livelihoods of resource-poor farmers in developing countries through plant sciences research.Information on individual projects in the programme can be found by selecting this programme in the advanced search page. Please note that expenditure given in the project records contributes towards the overall expenditure of the programme.DescriptionProject Background: The PSP broad spectrum of research encompasses the latest biotechnology techniques for screening and breeding for drought/disease tolerance through to the development of key technologies - simple, low-cost interventions, the impacts of which are large enough to induce farmers to make other, perhaps more risky or more costly, changes in agronomic practices in order to make yet further gains. The Plant Sciences Research Programme funds projects under five research theme [continued...
The objective of this project was to develop new photocatalytic or other innovative process chemistry for the treatment of pink water and related contaminated water.
Strategies are needed for assessing the risks of exposures to airborne toxicants that vary over concentrations and durations. The goal of this project was to describe the relationship between the concentration...Full Text Available
of Earth Science data and information management capabilities. Dale Schulz/400 . For your exceptional achievement in leading the joint LaRC/GSFC team in ...
Apr 9, 2003 ... Adam Kissiah Jr., a retired KSC engineer, will be honored for his development of the digital hearing aid technology that led to the cochlear ...
Jun 20, 2011 ... NASA and the Defense Advanced Research Projects Agency (DARPA) are offering high school students the opportunity to design experiments ...
This report gives a brief introduction to the project `Probabilistic Design Tool for Wind Turbines` - PRODETO - which was carried out during the years 1996-98 with partial funding from the European Commission under the Non-Nuclear Energy Programme JOULE III. The report gives an overview of the objectives and motivation for the project, and the methodology used. In this context, an example of reliability-based wind turbine design against fatigue failure is outlined with emphasis on the various important steps herein, which include probabilistic load and resistance modelling, calculation of failure probability, and calibration of partial safety factors for use with a deterministic design code format. The results of the project are presented with emphasis on a developed computer program and its capabilities, and the various elements of an executed case study are outlined. A list of project reports ...
The Bantam System Technology Project is one element of the Advanced Space Transportation Program -- a NASA initiative to reduce the cost of space launch and ...
KEPCO (Korean Electric Power Corp.) with the support of AECL and other Korean and Canadian subcontractors has created a strong multi-company team to execute design and construction of the Wolsung-2 CANDU 6 power plant. Key concepts of the project team are: 1. KEPCO is the project manager, and AECL is the major engineering and supply contractor; 2. Significant participation by Korean companies in design work in Canada and Korea; 3. Significant manufacturing in both Canada and Korea; 4. Construction by Korean contractors. Key concepts of the Wolsung 2 design are: 1. Evolutionary improvement of the Wolsung-1 plant which balances proven technology and necessary design improvements including current codes and standards. 2. Sharing some structures with the Wolsung-1 plant. This paper describes the successful establishment and operation of the complex project interfaces along with the current project status ...
The funding for a coal-liquefaction demonstration plant near Morgantown, W.Va., appears more certain since Japan has committed $175 million toward the project. West Germany has already signed a memorandum of understanding to contribute 25% of the expected $700 million cost. West Virginia Governor J. Rockefeller has said that he feels sure the Carter Administration will approve the project since half the money is assured. The solvent-refined-coal (SRC) demonstration program began in July 1978 with the award of two separate multiphased contracts for development of a solid process, SRC-I, and a liquid process, SRC-II. The US Department of Energy is expected to choose one of the projects for detailed design and construction by the end of fiscal 1979.
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
Purpose: This preliminary report describes the development and implementation of a project to improve access to literature in Latin American social medicine (LASM).Methods:...Full Text Available
We investigate the possibility of implementing a given projection measurement using linear optics and arbitrarily fast feedforward based on the continuous detection of photons. In particular, we systematically derive the so-called Dolinar scheme that achieves the minimum-error discrimination of binary coherent states. Moreover, we show that the Dolinar-type approach can also be applied to projection measurements in the regime of photonic-qubit signals. Our results demonstrate that for implementing a projection measurement with linear optics, in principle, unit success probability may be approached even without the use of expensive entangled auxiliary states, as they are needed in all known (near-)deterministic linear-optics proposals.
Studies continued on organic tracers for use as hydrologic tracers as part of the Yucca Mountain Site Characterization project. This subject report for the quarter 01/01/93 through 03/31/93 discusses the following issues: project organization and responsibilities; quality assurance program; design control; procurement document control; instructions, procedures, and drawings; document control; control of purchased items and services; identification and control of items; control of processes; inspection; test control; control of measuring and test equipment; handling, storage, and shipping; inspection, test, and operating status; control of nonconforming items and conditions; corrective action; quality assurance records; audits; software quality assurance; and scientific investigation.
The Hyperion project was developed to determine an algorithm for assessing the risk of hydrate plug formation in the pipeline transport oil-water-gas mixtures at low temperatures. The project is a collaboration between physicists, chemists and engineers within the petroleum industry. This paper provided an overview of the project and outlined results obtained as the project entered its third and final year. The main objective of the project has been to understand the inherent mitigation effects of some oils on gas hydrate formation as well as to develop methods of predicting the risk of hydrate plugging. To date, the project has extracted and studied natural inhibiting components (NICs) in oils. Molecular modelling techniques have been used to study hydrate and fluid interfaces in order to estimate the driving force of agglomeration and growth through mechanical ...
This report is a description of the West Valley Demonstration Project`s radioactive waste storage facility, the Chemical Process Cell (CPC). This facility is currently being used to temporarily store vitrified waste in stainless steel canisters. These canisters are stacked two-high in a seismically designed rack system within the cell. Approximately 300 canisters will be produced during the Project`s vitrification campaign which began in June 1996. Following the completion of waste vitrification and solidification, these canisters will be transferred via rail or truck to a federal repository (when available) for permanent storage. All operations in the CPC are conducted remotely using various handling systems and equipment. Areas adjacent to or surrounding the cell provide capabilities for viewing, ventilation, and equipment/component access.
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
Through the dedicated collaborative efforts of many individuals interested in supporting local education, computer laboratories were established at two urban high schools. The purchasing and implementation of the project was handled by the Alliance for Education, a local non-profit education advocate. Funds were supplied by the Air Force as part of a 3-year research activity utilizing artificial intelligence technology to tutor 9th grade students. NCR (now AT7T Global Information Solutions) corporate leaders provided the computers and network equipment at a considerable savings to the project. Each lab is a state-of-the-art facility with air-conditioning, carpeting, special computer tables, computer projection screens, and on-site technical support. Student and teacher enthusiasm toward the project has been gratifying and quantitative results are currently being evaluated for both attitude, skills, and ...
The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)
Space Network Ku-band service. ... Completed GLAST mission schedule and budget assessment .... Utilize Ku band SN link (TDRSS) for science data return ...
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
This document is the annual update of the FFTF and Advanced Reactors Transition Program Resource Loaded Schedule for FY 2002 using current project direction and authorized funding levels
An Environmental Impact Assessment (EIA) study for any project is a time- consuming process because it has a large number of dependent and independent variables that must be taken into account. Although EIAs are dependent on geo-spatial information in order to make an assessment, there are no standard rules for conducting an environmental assessment. In addition, each assessment objective is case-dependent, based on what information is available. This paper presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for projects, based on the integration between remote sensing technology, geographic information systems, and spatial modeling. The framework comprehensively analyzes the environmental vulnerability around the project areas and its impact on the...
Jan 31, 2002 ... Sequential Flow of EDA Functionality for Flow with Separation ...... for Automated Air Traffic Management," AGARD Lecture Series No. ...
Abstract: The NASA Landsat Pathfinder Humid Tropical Deforestation Project mapped global deforestation for the humid tropics. Data sets from both the TM ...
diet and genetic obesity metabolic defects and inflammation. To determine the role of adipocyte death in promoting adipose tissue inflammation and insulin resistance in animal...
... teaching and learning; Creating learning materials and teaching strategies; Developing faculty ... achieve educational innovations. Educational Materials Development (EMD): A project under the former ...
... grants to adopt or adapt courses and materials developed by CCD projects at other institutions, and ... to adopt or adapt CCD-developed courses and materials. -iv- Accomplishments The CCD program has ...
The goal of this effort Composability, Provability, Reusability (CPR) for Survivability is to address the problem of composition of survivable systems. The particular objective of this project is to construct a formal specification of the Java Virtual Mac...
This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.
Abstract The potential impact of climate change on areas of strategic importance for water resources remains a concern. Here, river flow projections for the River Medway, above Teston in southeast England are presented, which is just such an area of strategic importance. The river flow projections use climate inputs from the Hadley Centre Regional Climate Model (HadRM3) for the time period 1960 2080 (a subset of the early release UKCP09 projections). River flow predictions are calculated using CATCHMOD, the main river flow prediction tool of the Environment Agency (EA) of England and Wales. In order to use this tool in the best way for climate change predictions, model setup and performance are analysed using sensitivity and uncertainty analysis. The model's representation of hydrological ...
[Originating_Center='Centro Nacional Patagonico-Laboratorio de Mamiferos Marinos ']. Refine by Category. Please select a field, Projects, Data Centers ...
The next generation of particle accelerator is currently being designed at CERN. An understanding of the market forces in the computer industry will play a crucial role in the success of the project.
... being designed for projected Minotaur IV launch load environments, with design objectives of light weight, integrated vibration isolation, low shock ...
who was appointed in July to lead the Defense Advanced Research Projects Agency, or DARPA, made visits last week to UC Berkeley, Stanford, UCLA and the California Institute of...
Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It the...
with Science, Dr. Barbara McQuiston of the Defense Advanced Research Projects Agency (DARPA), spoke about a few interesting ways the Department of Defense is trying to...
2011 Department of Energy Investments in Carbon Capture Technologies 2010 Smart Meter Installations DOE Recovery Field Projects and State Memos Advanced Vehicle...
The major projects of the Los Alamos National Laboratory's Accelerator Technology Division are discussed, covering activities that occurred during the first six months of calendar 1982.
It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development ...
The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important ...
Argonne National Laboratory (ANL) is implementing waste minimization and pollution prevention activities into its conduct of decontamination and decommissioning (D&D) projects. Many of these activities are rather straight forward and simple approaches, yet they are often overlooked and not implemented as often as they should or could be. Specific activities involving recycling and reuse of materials and structures, which have proven useful in lowering decommissioning and disposal costs on D&D projects at ANL are presented.
The project on the free electron laser (FEL) of continuous action of the IR-range with the average power of 100 kW for conducting photochemical studies is described. The electron energy recovery by means of a linear accelerator-recuperator (AR) is applied in the FEL. The FEL and AR basic parameters are presented. It is supposed that the above project will be accomplished in two stages: the first order FEL-AR stage and the full-scale FEL-AR one. The possibilities of applying these facilities are indicated
The objectives of this project are to detect and characterize fractures in a naturally fractured tight gas reservoir, using surface seismic methods, borehole imaging logs, and in-situ stress field data. Further, the project aims to evaluate the various seismic methods as to their effectiveness in characterizing the fractures, and to formulate the optimum employment of the seismic methods as regards fracture characterization.
A series of questions and answers addresses issues related to developing synthetic fuels, including the potential supplies, regulatory road blocks, and development incentives to promote the role of the private sector. Chevron's efforts in the area of synfuels are aimed at shale oil tar sands and coal conversion. The status of these research and development projects and the projected recoverable reserves from each are summarized. (DCK)
The current status and future plans of the Ok Ridge Spallation Neutron Source (ORSNS) are reviewed. The ORSNS is a new project initiated by the U.S. Department of Energy (DOE) beginning October 1, 1995, to prepare the conceptual for a new spallation neutron source. (author) 2 refs.
The objective was to find out whether international research has now provided sufficiently reliable models to assess the corrosion behavior of spent fuel in groundwater and by this to contribute to answering the question whether the highly radioactive used fuel from nuclear reactors can be disposed of safely in a geological repository. Principal project results are described in the paper
This paper shows and describes the actions and methodologies adopted in commercialization of rural electrification projects in Parana State, Brazil. The actions evaluated aims to feasible the techniques to farm owners provides them properties with electric power. 7 figs., 2 tabs., 1 ref.
A detailed definitive cost estimate is given for an ethanol/gasohol storage and blending terminal serving a planned distillery at a Louisiana sugar factory. Included are an analysis of the accuracy of the estimate, labor rates efficiency, materials and labor escalation, as well as detailed calculations for each account of the project. (LEW)
BackgroundTwo randomized controlled trials of lung cancer screening initiated in the 1970's, the Johns Hopkins Lung Project and the Memorial Sloan-Kettering Lung...Full Text Available
Neutron Science Project was started at Japan Atomic Energy Research Institute since 1996 for promoting futuristic basic science and nuclear technology utilizing neutrons. For this purpose, research and developments of intense proton accelerator and spallation neutron target were initiated. The present paper describes the current status of such research and developments. (author)
Sponsored by the Defense Advanced Research Projects Agency the Image Understanding Workshop is a forum for the presentation of new research in vision, image analysis, and geometric modeling. Leading scientists present overviews of projects underway at major universities and corporate research sites, as well as results of individual work. The 1987 volume contains 94 articles and technical reports in two volumes.
The major purpose of the Police Family Life Education Project (FLEP) is 'to develop and deliver a program that will provide police recruits and their immediate family members with stress management education that focuses on the role and responsibilities o...
The IAEA Department of Safeguards established a project in 1996 for the year 2000 (Y2K) conversion activities. This project covered assessment, conversion and testing of the software applications, instrument evaluation software, embedded systems and Personal Computer (PC) hardware attached to various equipment. Significant progress has been made in converting the applications and instruments to be year 2000 compliant. At the same time Member states have made an effort as well in converting the systems used jointly at the facilities
Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.
Although the U.S. aerospace industry continues to be the leading positive contributor to the balance of trade among all merchandise industries, it is experiencing significant changes whose implications may not be well understood. Increasing U.S. collabora...
... News In Practice UK work Key facts & information Mass Balance Projects Resources & Library Technical Area Contacts Site Map Benchmarking solvent waste in the UK furniture manufacturing industry OrganisationBritish Furniture Manufacturers Ltd Project ReportSolvent Waste in Furniture Manufacturing Website: www.bfmenvironment.co.uk Return to list RSWT | Website Design Quiet Storm Solutions Ltd Please consider upgrading your browser! If you can see this ...
The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ...
Activities and results are reported of a project to investigate the application of remote sensing technology developed for the LACIE, AgRISTARS, Forestry and other NASA remote sensing projects for the environmental monitoring of strip mining, industrial pollution, and acid rain. Following a remote sensing workshop for EPA personnel, the EOD clustering algorithm CLASSY was selected for evaluation by EPA as a possible candidate technology. LANDSAT data acquired for a North Dakota test sight was clustered in order to compare CLASSY with other algorithms.
This issue of the newsletter on Engineering Design Activities (EDA) for the ITER Tokamak project contains a report on Second International Industries' Liaison meeting which was held in Tokyo on 2-4 April 1997 (by Y. Kaneki, JAIF, Japan); an overview report on the Blanket project (by A. Cardella, I.Ioki (ITER Central Team), W. Daenner (EU Home Team)); and a progress report on microwave reflectometry (by J. Sanchez, Madrid, Spain).
Decision-making is strongly based on modelling in two of our water supply projects concerning artificial ground water. The model used is a 2-dimensional flow and transport model using the element method. Due to sharp variations in Finnish soils, the modelling process is based on careful and detailed evaluation of basic hydrogeological data before and during model calibration.
Power generated by manufacturers and third-party suppliers in venture capital projects is available to military and other government users at a cost 10 to 20% lower. Tax benefits and other financial incentives keep suppliers' costs low. Users are required to contract for a minimum amount of energy over a 20- to 30-year period. Military use of these energy projects includes sources based on solar energy, cogeneration, geothermal heat, and refuse-derived fuel. (DCK)
Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by ...
We investigate theories of gravitation, in which spacetime is non-Riemannian and the metric g/sub munu/ is nonsymmetric, for ghosts and tachyons, using a spin-projection operator formalism. Ghosts are removed not by gauge invariance but by a Lagrange multiplier W/sub ..mu../, which occurs due to the breaking of projective invariance in the theory. Unified theories based on a Lagrangian containing a term lambdag/sup munu/g/sub / are proved to contain ghosts or tachyons.
Accounts are given of the history of coal liquefaction research and projects (indirect liquefaction, direct liquefaction, plus the recent state of Japanese developments and of process development), and of the significance of the petroleum age, the energy crisis and of coal liquefaction itself. (10 refs.) (In Japanese)
This report for the Swiss Federal Office of Energy (SFOE) presents the overview reports made by SFOE Heads of Program on work done in 2007. Projects reported on in the natural gas-fired fuel cell area include the EU-project REAL-SFOC, the long-term testing of anode-supported SOFC stacks, intermediate-temperature fuel cells based on proton conducting electrolytes, the interdisciplinary ONEBAT project and lifetime-enhancement of SOFC stacks for CHP applications. In the polymer-electrolyte fuel cell (PEFC) area, projects concerning proton-conducting polymer membranes, factors limiting the lifetime of fuel cell membranes, a new highly active oxygen reduction electrode for PEM fuel cell and zinc/air battery applications, the enhancement of PEFC durability and reliability, model-based investigation of PEFC performance, and local gas analysis of PE fuel cells are briefly reported on. Long-term research ...
A proposed project by which the island of Jersy could buy electric power from France is discussed. The interconnector will be capable of transmitting up to 50MW. Included in the project will be 27 km of submarine cable and 23 km of underground cable. An oil-filled cable containing 120 mm diameter copper conductors and weighing 47 kg/m is used. Details of the installation and oil system are given.
The author describes the feasibility study on implementing 18-months fuel cycle project in Daya Bay NPP: content, steps and major results including objective determination, benefit/cost assessment, electric net demands investigation, risk assessment, technical targets
Feasibility study is conducted for introduction of a top pressure recovery turbine (TRT) in China's Panzhihua Iron and Steel (Group) Company, Sichuan Province, for the potential project to simultaneously contribute to abatement of the greenhouse effect gases and to sustainable economic development of the counterpart country. This project considers to adopt the TRTs in 3 blast furnaces (No.1 to 3) of the 4 furnaces in service at the works, producing 2,500,000 t/y of crude steel, where the No.4 furnace is already provided with the model system and not considered in this project. According to the feasibility study results, the total fund required is 5.46 billion yen (Japan-made facilities: 4.172 billion yen, and China-made facilities: 1.288 billion yen), energy-saving effect is 36,467 t/y as crude, greenhouse effect gas emission abatement effect: 112,830 t/y as CO2, and pay-off period is 8.3 years. This plan considers ...
Abstract The success of software projects is quite subjective in nature and is fettered by many risks, the perception of which varies from individual to individual and largely depends on the demographic characteristics of the executives and even the characteristics of the project. This study aims to identify and gauge the software risk dimensions and analyze the differences of perception among executives toward software risks. The contributions of this study untangle the issues underlying risks in the software industry and associates these issues with the perception of the -human- factor present in the industry.
This article examines the developing market for independent power projects in Canada. The topics of the article include bidding in Ontario, the Quebec market, powering British Columbia, and market forces at work in Canada. Discussed are current projects in all stages of completion from bidding to production and includes gas-fired cogeneration, gas-fired combined-cycle electricity generation and cogeneration, wood-waste fired plants, repowering of existing utility plants, and hydroelectric power plants.
The U.S. Department of Energy and EPRI have co-funded this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project investigated catalytic oxidation of vapor-pha...
DescriptionFollowing publication of the Curry report, DEFRA have made a commitment to establish a number of pilot projects supporting a network of demonstration and development farms. These 'farms' are intended to support the process of technology transfer by giving free access to information on the practical application of new, emerging and best practice technologies. Protected Horticulture has been identified as a sub-sector requiring the establishment of one of these projects. One of the major pressures [continued...
Marshall Hall was selected by the US Army Corps of Engineers to participate in the Energy Efficiency Analysis Program. The objective of this program is to assist military installations in identifying energy usage and cost saving projects at their facilities and possibly provide funding for projects. Entech Engineering, Inc. was selected to perform this study.
This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and EDIN-sponsored renewable energy and energy efficiency projects.
Geothermal heat pump systems necessitate a comprehensive approach to geology and building facilities in order to be energetically useful and efficient. Cooperation with geothermal experts should be sought at an early projecting stage in order to obtain reliable data. Geothermal data and the technical facilities of the building must be matched for the project to be both effective and efficient. (orig.)
The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.
The Sacramento Municipal Utility District is developing a number of demonstration projects using geothermal heat pumps. This paper discusses some of the barriers and issues that have emerged over the past two years. The most important barriers are: regulatory impediments; high first cost; and a lack of local design and installation infrastructure.
The report summarizes results of the flue gas desulfurization (FGD) waste disposal field evaluation project sponsored by EPA at TVA's Shawnee steam plant, Paducah, KY. This pilot-scale project, initiated in 1974 and completed in September 1980, evaluated methods and costs for dis...
This report presents the methodologies and results of the field/laboratory experiments and mathematical modeling defined for the phase III of the project. Results from test cases 2-6 are given in separate chapters of the report (which have been indexed separately), and the last chapter discusses the lessons learned from the three phases of the DECOVALEX project.
This demonstration project uses modern simulation techniques to illustrate the important technologies and design variables that an auto-designer would consider in production a high efficiency, low emissions vehicle. Simulation and modeling techniques use the idea of capturing the relationships between real components of the systems with mathematical equations. These equations are then solved on a computer to simulate the behavior or performance of the system under various conditions. In the current demonstration project, we focus on many variations of a hydrogen-powered vehicle.
Compton scatter tomography utilizes the electronic collimation characteristics available through the Compton scattering angle-energy correlation to obtain tomographic images. In this work we present particular aspects of the technique, which are relevant to the inverse radiation transport problem of reducing marginal projection data to radial two-phase flow regime maps. The results indicate a viable technique for the tomographic imaging of tow-phase flow using practical source strengths and reasonably few detectors.
A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly S shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.
Tabulated data are presented from air monitoring studies in the vicinity of the Chalk Point fossil-fuel power plant located in a coastal region of Maryland. (ERA citation 02:057363)
The `biotechnology 2000` project is supervised by the project sponsor `biology, energy, ecology` at Forschungszentrum Juelich on behalf of the Federal Ministry for Research and Technology. The project activities cover the development of techniques and methods, cell biology, gene structure and gene regulation, photosynthetic production processes, biological hydrogen production, synthetic biology, protein design, neurobiological research, biosystems, plant breeding, phytomedicine and plant protection, the biology of waste disposal methods, research into methods which replace animal experiments, biological safety research, technology risk assessment, and ethical aspects. A general survey introduces the promoted projects, and standardized data sheets briefly introduce the individual activities. The appendix gives the project indices, the indices of joint projects, a ...
The Bureau of Mines has two projects in the remote sensing field as it pertains to mining. One of these is a completed contract that studied the use of aircraft mounted cameras and the results of photogrammetry. The second project is an ongoing contract to study the effectiveness of using an instrumentation system wired to remote data collection station to record embankment data. 6 refs.
A central problem in diagnostic radiology is to compare a new X-ray picture with a previous picture and from this comparison be able to decide if anatomical changes have occurred in the patient or not. It is of primary interest that these pictures are identical in projection. If not it is difficult to decide with confidence if differences between the pictures are due to anatomical changes or differences in their projection geometry. In this thesis we present a non invasive method that makes it possible to find the relative changes in the projection geometry between the exposure of a previous picture and a new picture. The method presented is based on the projection slice theorem (central section theorem). Instead of an elaborate search for a single new picture a pre-planned set of pictures are exposed from a circular orbit above the patient. By using 3D Fourier transform techniques we are able to ...
Progress in four research areas on this project are summarized under the following topics: (1) Geminate charge pair recombination in hexane; (2) Fast current measurements resulting from excitation of charge transfer (CT) states; (3) Measurement of the dipole moment of excited states by DC conductivity; and (4) Charge separation at macroscopic interfaces between electron donor and acceptor solids. In a final section, personnel who have contributed to the project during the past budget period are described.
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at ...
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is verified with post-construction energy-use data from a geothermal heat pump ESPC at ...
This article discussed a project formed to develop innovative seismic imaging technologies. The Kaleidoscope project aims to accelerate the processing of seismic sound waves by several orders of magnitude using advanced computer-based techniques to reveal oil and gas deposits buried deep in the earth in a manner that is both cost-effective and efficient. It is expected that the technology will be used in deep water applications with massive untapped reserves. The seismic technology will be used to locate hydrocarbons and oil reserves buried 20,000 feet beneath the seabed. It is estimated that the Gulf of Mexico contains 56 billion barrels of oil equivalent worth nearly $6 trillion. However, the reserves are difficult to locate due to the interbedded salt bodies in the subsurface. The project is simultaneously working on both hardware and software applications, and are currently writing the first petascale set of seismic ...
The Thai-Canadian Nuclear Human Resources Development Linkage Project (the ''Project'') was initiated in 1994 in order to develop the engineering and scientific expertise needed for Thailand to decide whether and how the country can best benefit from the establishment of a nuclear power program. The Project was designed to upgrade current academics and people in industry, and to develop an adequate supply of new technical personnel for academic, industry, utility, regulatory and other government institutions. The key Project objectives included the establishment of a Chair in Nuclear Engineering at Chulalongkorn University, the upgrading of the current Masters level curriculum, the establishment of undergraduate and doctorate level curricula, development and delivery of an industrial training program for people in industry and government, exchanges of Thai and ...
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance ...
Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the ...
In consistency with the increasing requests from Member States for establishing radiotherapy programmes, an IAEA Technical Co-operation project was initiated in Latin America aimed at improving the physical aspects (as a complement to the clinical issues) of quality assurance in radiotherapy; this ARCAL XXX project (RLA/6/032) was classified as a Model Project of the IAEA. Among the important outcomes of the project were (i) the training of a considerable number of medical physicists in hospitals of the region, (ii) the development of a protocol for quality control procedures, and (iii) the organization of quality audit site visits (to the participant countries) where the implementation in hospitals of the developed quality control procedures is verified. The present publication is the protocol for quality control of the physical aspects of radiotherapy. It contains detailed procedures on what should be ...
Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international ...
Floating Production, Storage and Offloading (FPSO) systems have become a popular choice in recent years for marginal, fast-track or deepwater field developments world wide. However, the majority of these developments have incurred significant project delays and budget overruns as a result of commercial structure, project management and design/operating problems. The Health and Safety Executive (HSE) commissioned IGL Engineering Ltd to perform a study to highlight specific areas where safety concerns have arisen. The study also aims to identity the fundamental causes of problems and identify key lessons to be learned from such projects which can be used to the benefit of future developments. In summary, there are five fundamental areas where weaknesses can and have lead to the problems experienced in FPSO developments. The areas are all interrelated and many problems stem from deficiencies in more than one area. The areas ...
This document defines the quality system requirements for the US Department of Energy, Richland Operations Office (DOE-RL), Environmental Restoration (ER) Project at the Hanford Site. The Environmental Restoration Project Quality System Requirements for the Hanford Site integrates quality assurance requirements from the DOE Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), the Hanford Facility Resource Conservation and Recovery Act of 1976 (RCRA) Permit, and applicable Federal and Washington State regulations. This document, based on ten criteria, provides user organizations with the flexibility to incorporate only those criteria and paragraphs applicable to their specific scopes of work. The requirements of this document are to be applied based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities. The user ...
The major problem plaguing the synfuels industry is the financing of large capital requirements in a technologically unproven field. This is exemplified by the 2 to 3 billion dollar investment required by oil shale development. Despite an unquestionable resource which is well characterized and a wealth of information from processes which have undergone extensive pilot development work, financing of a project is difficult because of the risk. In recent studies on a worldwide basis as a background for evaluating the Cottonwood Wash project in the Uinta Basin, Utah, the concept of small scale or modular development of this type of resource can lead to acceptable economics with a substantially higher probability of actual completion. This study discusses Uinta Basin oil shale resources and current developments and evaluates the economics of small scale or modular development for the Cottonwood Wash project processes. This ...
This project is part of PETC`s Advanced Power Systems Program, whose mission is to accelerate the commercialization of affordable, high- efficiency, low emission, coal-fueled electric generating technologies. A process concept - Clear Liquor Scrubbing with Anhydrite Production - was proposed and accepted by PETC as a Phase I project in its Mega-PRDA program. the project integrated three process operations - chloride control upstream of the flue gas desulfurization (FGD) system, a clear liquor process for enhanced SO{sub 2} removal performance, and production of anhydrite (anhydrous calcium sulfate) rather than calcium sulfite or gypsum (calcium sulfate dihydrate). The first step in the project was to perform batch and flow-through experiments in the laboratory to confirm theoretical calculations and preliminary laboratory results concerning anhydrite formation, these laboratory experiments were designed ...
Renewable Energy Technologies (RETS) have over the years become an integral part of the energy supply chain in most developed countries. Recent projections show that 13.5% of the world's primary energy supply comes from renewable and this figure has an aggregated annual growth rate of 16%. Wind has the highest annual growth rate of 22% while the least annual growth rate of 2% is for hydropower. The main push for renewable like wind in the OECD countries are environmental concerns and the business aspect in power generation. The situation is however completely different in Africa, where the thrust for RETs is developmental based. Although the continent has abundant renewable energy resources like solar, biomass, wind and hydro potential, they have remained largely unexploited. Several efforts have been made to help African countries like Zimbabwe to exploit such resources. The main objectives of this country study included review of Zimbabwe's ...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada- Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). This revised document provided the case for requesting an increase in the facility maximum daily production rate and the average annual production rate for the White Rose field from 100,000 barrels per day (bpd) as stated in the approved White Rose Development Plan to 140,000 bpd. In order to determine the potential for increasing oil production through the Floating Production, Storage and Offloading (FPSO) vessel, two things were considered, namely the proper reservoir management of the White Rose field to ensure optimum resource recovery, and the capacity of the FPSO topsides processing system and supporting utilities to accommodate increased production. This document presented a detailed review of all the implications of increased production ...
Plasma arc welding processes are used in off-shore industry for construction and maintenance in the wet surrounding of underwater structures and pipelines. In greater water depth the density of the plasma gas increase because of the greater hydrostatic pressure. This causes the increase of conductive heat losses to the wet surrounding. To keep up the energy flux to the workpiece to be welded, the plasma arc has to burn in a local dry area with an inside pressure of 1 bar. This requirement can be fulfilled by a rotating cylinder with a liquid film flowing down the inner wall. The flow around the rotating cylinder to create a local dry area around the plasma arc under water is experimentally investigated. The rotating cylinder is placed above the work surface which is simulated by a flat plate. According to the centrifugal forces of the rotating flow inside the gap between the lower end of the cylinder and the flat plate the water is forced out of the cylinder. The ...
Satellite imagery is a cost-effective tool for creating and updating basemaps of coastal zones, especially where existing maps and aerial photographs are unavailable, are out-of-date, or provide limited information. Reliable maps of coastal zones are particularly important for oil spill modelling programs. Color IR (multispectral) images with 20m x 20m ground resolution and black & white (panchromatic) images with 10m x 10m ground resolution of many coastlines around the globe have been acquired from 1986 to present by SPOT Image Corporation. We have digitally merged same-day SPOT panchromatic and multispectral imagery to provide maximum spatial resolution and permit excellent color differentiation of coastal zone features. This combination adequately discriminates individual features, including pipelines, offshore platforms, storage tanks, jetties, and shoreline type. The SPOT images were interpreted within a workstation environment and the coastline ...
This presentation outlined the energy policy in the United States and its impact on frontier development in Alaska, deepwater offshore fields and in the western oil shale resources. The energy strategy focuses on technologies that increase domestic production from existing resources as well as technologies that create new sources of energy. In addition to emphasizing the cooperation between Canada and the United States in ensuring energy supply security and stability, this paper discussed the importance of overall bilateral trade between the 2 countries. It was noted that Canada is the United State's most secure and reliable energy partner and is the number 1 supplier of imported oil, natural gas, electricity and uranium. The Bush administration's energy policy is based on the mandate to supply stable, reliable, secure, affordable and environmentally sound energy for the country's growing economy. The energy strategy focuses on increasing ...
An increased use of floating production facilities for offshore oil production in the past fifteen years was due in part to advances in technology, the opening of new frontiers and the increased emphasis on value driven development. Throughout the world, a total of 121 floating production systems were in operation in February 2001, and orders had been placed for an additional 27. Located near the nose of the Grand Banks, approximately 350 kilometres east-southeast of St. John's, Newfoundland is the Terra Nova development. Twelve years elapsed between the discovery of the field in 1984 and the granting of the approval for development in 1996. The decision was made to use a floating production system as the Terra Nova was not considered robust enough to support a gravity base, ice resistant structure development concept, especially considering that it came on the heels of the Hibernia development. The first Floating Production, Storage and Offloading (FPSO) ...
Calgary-based TAG Oil is an exploration company that manages 4.1 million acres of major producing oil and gas fields in New Zealand. The enormous Maui field, with 4 tcf of natural gas in place, has dominated the gas market in New Zealand by meeting nearly 90 per cent of the country's energy demand at costs much lower than world prices. However, the maturing field is in decline and will cease production by 2008. New gas field discoveries will only meet 60 per cent of the country's energy requirements for 5 additional years. Unless new large reserves of gas are discovered, the supply and demand situation will get worse. Lead time to place new production on-stream requires 5 to 10 years, which creates a large supply gap over the next decade. Public resistance to coal-fired power plants, new hydroelectric dams and nuclear power has left the country with no viable alternative to natural gas. TAG Oil has taken this unique opportunity to create value when gas demand is at its maximum and ...
The Georges Bank, off southwestern Nova Scotia, is one of the most biologically productive continental shelf ecosystems in the world. It supports a wide diversity of species, including many seabirds. In 1988, federal and provincial legislation placed a moratorium on petroleum exploration and drilling on the Georges Bank, directing the ministers of Natural Resources Canada, and of the Nova Scotia Department of Natural Resources to make a decision regarding the moratorium by January 1, 2000. This report by the Ecology Action Centre (EAC) asks the Georges Bank Review Panel to recommend extending the moratorium on Georges Bank and adjacent areas until 2012, in part to match the American moratorium. Other reasons why the panel made this recommendation were explored. The principal reason is the EAC concern that when the moratorium is lifted, several oil and gas developments will proceed in this ecologically significant offshore area that could result in the loss of the ...
Detailed quantitative sequence stratigraphic analysis and three-dimensional (3-D) modeling of the fluvio-deltaic Pikeville, Hyden, and four Corners formations of the Breathitt Group, eastern Kentucky, indicate that it is possible to make confident deterministic correlations of sand bodies at offshore development well spacings. The key to high-confidence correlation is the delineation of the 3-D architecture of third-order composite sequences, which are seismically mappable, and the recognition of internal fourth-order sequences, which are stacked into lowstand, transgressive, and highstand sequence sets. Volumetric partitioning of reservoir sand bodies between systems tracts and sequences allows prediction of channel sandstone geometries and channel: crevasse splay ratios. Furthermore, channel-fill type is predictable from the sequence stratigraphy. Within 13 studied fourth-order sequences, incised valley fills represent the main reservoirs, which are laterally ...
The seismic reflection exploration technique which is one of the geophysical methods for oil exploration became effectively to image the subsurface structure with rapid development of computer. As a tool to perform seismic inversion, seismic forward modeling program using ray tracing should be developed. In this study, we have developed the algorithm that is to calculate the travel time of the complex geological structure using ray tracing by subdividing the geologic model into triangular element (finite element) having the constant velocity. We can analytically calculate Jacobian with some information by this current ray tracing. With this Jacobian, we will develop new algorithm which is to obtain geological properties and to image the subsurface. After subdividing subsurface into triangular element we shoot off the ray into subsurface by the Snell`s law. And then after taking the ray path which is similar to proper assumption we can calculate travel time. With this new ray tracing ...
Oil exploration began in Florida in 1901, but no oil was found until 1943. In November of that year, Humble Oil and Refining Co. made a discovery near Sunniland in southern Florida. This field and the producing zone were called Sunniland. No further discoveries were made in southern Florida until 1954 when the Forty-Mile field was discovered by Gulf Oil Co. Ten years later, in 1964, the Sunoco Felda field was discovered by Sun Oil Co., followed by West Sunoco Felda field in 1968. The examination of numerous cores and thin sections of this formation, both from producing fields and wildcat wells, reveals a sequence of deposition in the Sunniland formation. It has been reported that tintinnids or calpionellids have been observed in the lower mud section, but investigation of many thin sections from this section revealed only ostracod particles. Above the mudstone, the section becomes increasingly plentiful in fragmented microbored rudist particles and forams such as Orbitolina texana, ...
Statoil is operating an increasing number of offshore and onshore pipelines in the North Sea area and elsewhere. Cathodic protection is a significant part of the corrosion management for these lines and we have collected a significant amount of experience with respect to design and operation of the systems. This paper deals with our comprehensive program for the onshore cathodic protection systems and the various challenges in different countries with respect to technical matters, such as operating conditions and different terrain. Generally, the systems are based on automatically controlled rectifier systems with a wide range of current drainage and very comprehensive monitoring of potentials and current flowing. The use of coupons, polarisation cells and buried reference cells are essential, as well as the use of intensive measurements along the route. The use of online monitoring of selected test posts and all rectifier units is considered essential for remote ...
Pipeline leak detection technologies can be classified according to their specificity, such as their application to offshore or onshore installations or to multi-phase or single-phase flow regimes. They can also be classified according to the technology on which they are based. Available technologies can be categorized into the following 4 groups: (1) compensated mass balance, solving steady state equations which model a specific pipeline, known as real time mode (RTM), (2) the same as group 1, but solving transient equations, known as real time transient model (RTTM), (3) pressure wave behavior, and (4) statistical modeling. Hybrids schemes can also be found. Effective leak detection systems are needed to address the increasing transformation of very large crude cargo (VLCC) ships into floating production, storage and offloading (FPSO) systems. These operations make use of short and large diameters exporting lines, and often involve the use of hoses instead of ...
The present situation of the researches that have been made for predicting the process and range of diffusion of warm drain is reviewed. This review is divided into eight sections. The first section deals with the present situation of warm drain from power plants. For the establishment of drainage standard, there are many difficult problems to be solved because water temperature differs in its nature from other regulation items. In the second section, the process of diffusion and cooling of warm drain is explained. The third section deals with the diffusion characteristics of warm drain in Japanese coastal sea due to water temperature. Two types of diffusion are known. One is dominant irregular current, and the other is periodical reciprocating stream. The fourth section deals with the methods of prediction of diffusion. Research methods and simulation models are described. The fifth section deals with the prediction with single layer model. Fundamental consideration on the simulation ...
This paper describes the development, design, and fabrication of the crude oil process facilities, and the conversion of an existing tanker for use at the Liuhua 11-1 Field. Over a 16-month period spanning 1994 and 1995, Amoco Orient Petroleum Company, and partners, China Offshore Oil Nanhai East Corporation (CONHE), and Kerr-McGee China Petroleum Ltd., converted a crude oil tanker originally built in 1975 to the Nanhai Sheng Li, the floating production, storage and offloading (FPSO) facility for the Liuhua 11-1 Field. The FPSO will process up to 65,000 BOPD produced from 20 subsea wells located 1.7 miles away. In addition to the processing facilities for produced oil and water, the FPSO has a processed crude oil storage capacity of 715,000 bbls. The ship`s propulsion system was removed during the conversion, because the FPSO is permanently moored at site by means of a 10-point, ``soft`` mooring. The mooring system was designed to survive the 100-year-return-period ...
Work over the last few years at the Idaho National Engineering and Environmental Laboratory (INEEL) has included a major focus on applying human performance and human reliability knowledge and methods as an integral element of system design and development. This work has been pursued in programs in a wide variety of technical domains, beginning with nuclear power plant operations. Since the mid-1980`s the laboratory has transferred the methods and tools developed in the nuclear domain to military weapons systems and aircraft, offshore oil and shipping operations, and commercial aviation operations and aircraft design. Through these diverse applications the laboratory has developed an integrated approach and framework for application of human performance analysis, human reliability analysis (HRA), operational data analysis, and simulation studies of human performance to the design and development of complex systems. This approach was recently tested in the NASA ...
The poster illustrates how the recent developments in genetic stratigraphy have contributed to constrain reservoir layering and to improve prediction of reservoir quality in the oil-bearing reservoir of N`KOSSA. The mixed lithology deposits formed during Albian times. Thanks to the excellent core coverage of the reservoir (4 cored wells over the entire reservoir interval), continuous sedimentological examination and interpretation of the facies succession have been carried out. The reservoir can be subdivided into composite sequences (50 to 150 in thick) which are made up of stacked metre-scale genetic units. Three different stacking patterns of genetic units have been identified; retrogradation, aggradation and progradation. These patterns reflect a gradual change of depositional regimes through time. Facies variations (texture, bio-association, geometry, spatial distribution) and early diagenetic overprints can be related to each type of stacking pattern. One additional model ...
During secondary oil recovery, water is injected into the formation to sweep out the residual oil. The injected water, however, follows the path of least resistance through the high-permeability zones, leaving oil in the low-permeability zones. Selective plugging of these their zones would divert the waterflood to the residual oil and thus increase the life of the well. Bacteria have been suggested as an alternative plugging agent to the current method of polymer injection. Starved bacteria can penetrate deeply into rock formations where they attach to the rock surfaces, and given the right nutrients can grow and produce exo-polymer, reducing the permeability of these zones. The application of microbial enhanced oil recovery has only been applied to shallow, cool, onshore fields to date. This study has focused on the ability of bacteria to enhance oil recovery offshore in the North Sea, where the environment can be considered extreme. A screen of produced water ...
Occurrence and distribution of harbour porpoises (Phocoena phocoena) in and around the off-shore wind farm on Horns Reef, Denmark, was investigated. This report describes data collected in 2003 as part of an ongoing monitoring program, covering a period before construction of the wind farm (baseline), the construction period in 2002 and one year following construction of the wind farm. Data from acoustic dataloggers (T-PODs) and visual surveys conducted from ships confirmed the presence of harbour porpoises inside the wind farm area during all periods investigated. Comparison with baseline data from 1999-2001 and with control areas outside the wind farm did not show a statistical significant change in sighting rates inside the wind farm area in the first year following construction relative to baseline. T-POD data showed a pronounced effect of the construction of the wind farm on the indicators 'encounter duration' (measure of how long porpoises ...
There are at present 116 floating production systems and 60 storage vessels dotting the oceans involved in hydrocarbon exploration and production activities. Although concentrated mostly in the North Sea, they can be found also off the coast of Australia, eastern Canada, Brazil, some African nations and the Gulf of Mexico. They range from converted tankers to purpose built rigs. The most adaptable of the various systems is the floating production, storage and offloading (FPSO) vessel, first developed as a cost-effective means of developing fields in Brazil's very deep offshore areas. Still being tested and modified for work in widely different environments, FPSOs appear to have met all requirements in producing expenditure efficiencies, maximizing profits, and protecting workers. One of the most efficient and most technically advanced is a 292-metre long FPSO built for the Terra Nova Alliance by Daewoo Shipyards in South Korea. It arrived at ...
Norway is privileged with extensive resources of natural gas, oil and hydropower. Location of gas fired combined cycle (CC) power plants in Norway offers advantages due to the availability of natural gas from the Norwegian continental shelf and fairly low ambient temperatures, giving high fuel-to-electricity conversion efficiency. The continental shelf provides large storage capacity for CO{sub 2} in deep saline aquifers and in drained gas fields. In this paper the results of extensive work on CO{sub 2} capture carried out during the last years by Statoil in co-operation with several engineering contractors, are presented. The goal has been to develop a commercially viable concept for a combined cycle power plant including CO{sub 2} capture and sequestration. The main concept is based on CO{sub 2} capture from exhaust gas from a combined cycle power plant, using absorption by amine (MEA) solutions. The CO{sub 2} is compressed, transported by pipeline and stored in a deep saline aquifer ...
The Economic Analysis (EA) report is written to address the impacts of this proposed Effluent Limitation Guidelines and Standards for Synthetic-Based and Other Non-Aqueous Drilling Fluids. Currently, effluent guidelines pertaining to the discharge of drilling fluids address two specific types of fluids: Oil-based drilling fluids (OBFs) that use diesel and mineral oil, which are prohibited from being discharged; and Water-based drilling Fluids (WBFs), which can be discharged subject to meeting certain discharge requirements, including a sheen test and an aqueous toxicity test, in certain limited offshore regions. Section Two presents sources of data, Section Three presents the industry profile, Section Four discusses the regulatory costs of options under consideration for the proposed rulemaking, and Section Five discusses the impacts of the proposed rule on firms, well drilling, and production, and also briefly discusses secondary impacts such as those on ...
A system is described adapted for alternative use as a diverter or a blowout preventer for a bottom supported drilling rig and adapted for connection to a permanent housing attached to rig structural members beneath a drilling rig rotary table, the permanent housing having an outlet connectable to a rig fluid system flow line. The system consists of: a fluid flow controller having a controller housing with a lower cylindrical opening and an upper cylindrical opening and a vertical path therebetween and a first outlet passage and a second outlet passage provided in its wall, a packing element disposed within the controller housing, and annular piston means adapted for moving from a first position to a second position, whereby in the first position the piston means wall prevents interior fluid from communicating with the outlet passages in the controller housing wall and in the second position the piston means wall allows fluid communication of interior fluid with the outlet passages and ...
Case studies were made of the following dislocated worker programs: Cummins Engine Company Dislocated Worker Project; GM-UAW Metropolitan Pontiac Retraining and Employment Program; Minnesota Iron Range Dislocated Worker Project; Missouri Dislocated Worker Program Job Search Assistance, Inc.; Hillsborough, North Carolina, Dislocated Worker Project; Cleveland, Ohio, United Labor Agency Dislocated Worker Project; Houston Community College-Texas Employment Commission Dislocated Worker Project; Tacoma, Washington, ASARCO Copper Smelter Dislocated Worker Project; and Dane County, Wisconsin, Dislocated Worker Project. All of these programs had placement rates higher than those of Comprehensive Employment and Training Act (CETA)-funded demonstrations, and only two of the programs for which a wage replacement ratio could be calculated had ratios ...
The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate ...
The EMS Energy Institute at The Pennsylvania State University (Penn State) has managed the Gas Storage Technology Consortium (GSTC) since its inception in 2003. The GSTC infrastructure provided a means to accomplish industry-driven research and development designed to enhance the operational flexibility and deliverability of the nation's gas storage system, and provide a cost-effective, safe, and reliable supply of natural gas to meet domestic demand. The GSTC received base funding from the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) Oil & Natural Gas Supply Program. The GSTC base funds were highly leveraged with industry funding for individual projects. Since its inception, the GSTC has engaged 67 members. The GSTC membership base was diverse, coming from 19 states, the District of Columbia, and Canada. The membership was comprised of natural gas storage field operators, service companies, industry ...
Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results ...
The objective of the three-phase Holly Sugar Geothermal Project was to replace fossil fuels with geothermal energy for sugar beet processing at the Holly Sugar plant located in Brawley, California, in a technically straightforward, economically sound and environmentally acceptable manner. The first phase of the project, discussed in this final report, encompassed the design and analysis of a geothermal industrial heat system for Holly Sugar and addresses: (1) assessment of the geothermal resource; (2) development of a preliminary system design; (3) analysis and publication of an environmental analysis and monitoring report; (4) preliminary economic analyses; (5) dissemination of project related information; and (6) the development of a proposal for the follow-on phases.
This research will be helpful for people to display the 2-dimensiona projective models of 4-variable actual problems in many fields, in order to investigate deeply those actual problems. By using the theory of N-dimensional finite rotation group of the regular polytopes, the author established the 2-dimensional projective model of 4-dimensional rectangular coordinate system, and deduced a transformation matrix, and adopt it to display successfully the 2-dimensional overall shapes of two most complicated regular polytopes 120-Cell and 600-Cell. In the meantime, the author calculated all the vertex coordinates and determine the joint relationships between adjacent vertices of the regular polytopes 120-Cell and 600-Cell. Also, this provided a pattern for displaying the 2-dimensional projective model of 4-variable actual problem.
Integrated resource planning is rapidly emerging as the preferred planning process for electric utilities. Under IRP, planners project the initial and annual operating costs of different resource options and compare them using the revenue-requirements method (RRM)- a project-evaluation technique that discounts future costs (i.e., revenue requirements) into present values. The discount rate used for these computations is usually the firm's weighted-average cost of capital (WACC)-the weighted-average cost of the firm's equity and debt. The project alternative with the lowest present-value revenue requirement (PVRR) (i.e., lowest costs) emerges as the economic choice.
A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of ''passive'' Advanced Light Water Reactors. The effects of aerosols that may result from hypothetical severe accidents are also considered. The construction of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA, has been completed. First steady-state tests have been performed on PANDA. The other facilities are now in their commissioning phases. Scaling studies have guided the design of the experimental facilities. Several small-scale experimental and studies have already produced valuable results which can be used to direct the experimental work, as well as the design of the passive ALWRs. (author). 23 refs, 6 figs.
The Surry low power and shutdown probabilistic risk analysis (PRA) is an ongoing project at Brookhaven National Laboratory (BNL) to identify and quantify potential accident scenarios that may occur in a pressurized water reactor (PWR) during low power and shutdown. It was initiated as a result of various incidents and accidents that have occurred within the United States and overseas. The project involves review and evaluation of PWR experience at shutdown, identification of accident scenarios, determination of methods to mitigate the accidents, and performance a level 1 PRA. An evaluation of accident progression, source terms and consequences has also been initiated. The results will be used to address issues related to shutdown conditions. The objective of this paper is to provide a progress report on the project, and to present the approach used as well as the preliminary results of the ongoing and completed tasks.
This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of research done in the third phase of a research project that investigated components for small heat pump systems that use ammonia as a working fluid. The report includes a summary of the findings of the first two phases of the project and goes on to describe tests done with rotary vane and scroll compressors. The aims of the project are discussed and the work done is listed chronologically. The construction and the components of the test installation are described in detail. Also, the heat pump testing facilities at the University of Applied Science in Rapperswil, Switzerland, are described. The results of the measurements made for various temperature gradients are presented in detail and commented on; also, the various types of compressor tested and other heat pump compressors are compared.
This pilot project was carried out for the purpose of testing methods for active biological monitoring. It covered a period of three years (until September 1994), including two years of exposure. The measurements served to determine pollutant levels in plants used as animal fodder and dust-borne heavy metal concentrations in different sites and, on this basis, to obtain indirect information on human exposure. Among others, the pilot project investigated the suitability of Italian rye-grass as a biological indicator for aluminium, arsenic, cadmium, cobalt, chromium, copper, iron, mercury, magnesium, manganese, nickel, lead, platinum, antimony, titanium, and zinc. (orig./GL).
The objective of this paper is to give an overview on the seismic evaluation and retrofitting procedures of reinforced concrete buildings within JICA technical cooperation project in Romania. The content of the paper covers a) an outline of the seismic evaluation; history and comparison of Romanian seismic design codes with the Japanese seismic evaluation guidelines, b) an outline of the retrofitting techniques which were transferred from Japan to Romania and structural tests for retrofitting techniques employed in Romania and c) retrofitting details that were used by JICA/NCSRR in the retrofitting design of two vulnerable buildings in Bucharest. The above-mentioned retrofitting projects are now under development of detailed design and therefore, in the near future, refining and improvement of solutions will be performed. (authors)
Just below the Arctic Circle, about 200 kilometres off the Helgeland coastal region of Norway, lies the Skarv oil and gas field. Discovered in 1998, the greater Skarv development project now includes the Idun gas field. The Skarv development has begun to take shape, now roughly half-way to commencement, so Scandinavian Oil-Gas Magazine decided it was time to take a look at the project's progress thus far and what's left to do before production that's slated to begin in late summer, 2011. The Skarv Project include subsea wells connected to a floating production storage and offloading (FPSO) vessel to process oil and condensate and a gas export pipeline that ties back to the Aasgard Transport system. (AG)
Variability in production is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced practical limitations in their application. A multiobjective analytic model (MAM) is proposed to develop a graphical solution for the design of Work-In-Process (WIP) Bf in order to overcome these practical limitations to Bf application, being demonstrated through the scheduling of repetitive building projects. Multiobjective analytic modeling is based on Simulation?Optimization (SO) modeling and Pareto Fronts concepts. Simulation...
ABB High Voltage Cables AB started the MPS (More Power Submarine cables) project in 1993 with a view to exploring new technology opportunities. The goal is to design and type test a submarine HVDC cable for a capacity of 1200 MW at 600 kV. On the day before ABB announced its success in winning the contract for the world`s largest ever submarine HVDC link project for the gigantic Bakun project in Malaysia, ABB Power Systems described progress to date at a symposium in Karlskrona. The proceedings included a test demonstration on an extruded cable which eventually broke down at a stress of over 935 kV -not in the insulation itself but in the end terminations. The electric field was in excess of 200 kV/mm which is higher than ever before reported. (UK)
To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No ...
Information technology allows national and local governments to satisfy the needs of citizens in a cost effective way. Unfortunately, citizens still tend to prefer traditional, more costly channels, such as the front desk, phone and mail. Through pilot projects government agencies attempt to influence this behavior of citizens, directing them towards the online channel. With this paper we provide insight into the possibility to influence citizens' behavior in the complex landscape of multi-channel service provision. The paper systematically compares five pilot projects using a framework that is based on organizational and marketing literature. The results show that socio-psychological factors are crucial in multi-channel management, much more than the technology itself. We conclude that ci...
Four interrelated projects are underway whose purpose is to migrate the LAMPF-PSR Accelerator Complex control systems to a system with a common set of hardware and software components. Project goals address problems in performance, maintenance and growth potential. Front-end hardware, operator interface hardware and software, computer systems, network systems and data system software are being simultaneously upgraded as part of these efforts. The efforts are being coordinated to provide for a smooth and timely migration to a client-sever model-based data acquisition and control system. An increased use of the distributed intelligence at both the front-end and operator interface is a key element of the projects. 2 refs., 2 figs.
Biomass combustion is an important part in a sustainable energy system, but as well a source of submicron (particles < 1 #mu#m) particles in the air. Consequently, to obtain a good air quality together with increased biomass combustion there is a need for a better understanding of particle formation. This work is a part of a larger project about formation and emissions of particles from biofuel combustion. The report includes the work performed in the project during the year 2004. The aim of the project is to describe the release of inorganic components, which cause particle emissions, during combustion of single fuel particles of biofuel, e.g. wood pellets. The work is carried out by emission measurements, systematic combustion experiments and modelling work. The results are expected to contribute to the understanding of which parameters that influence the formation of fine particles and thus gain a better insight into ...
There are two fundamental reasons or motivations for energy conservation: (1) economics; and (2) consideration of energy - its sources and availability. Economics speaks for itself and needs little explanation: a project is undertaken, the cost is recovered in a given period of time (we hope) and our company realizes cost savings thereafter. We study and propose a project; we estimate the payback. If approved, we implement the project. Then, we eagerly watch for its effectiveness - for the proposed payback. The second consideration in regard to energy conservation might - in the foreseeable future - become by far the most important - that of availability. Very knowledgeable persons have stated that this - in reality - is the most serious problem facing our nation today. Readily available, reasonably priced energy has given to the US the high form of living experienced today. An interruption in this flow could catapult our ...
This report is based on a study carried out by the NEA Decommissioning Cost Estimation Group (DCEG) on decommissioning cost elements, estimation practices and reporting requirements. Its findings indicate that cost methodologies need to be updated continuously using cost data from actual decommissioning projects and hence, systematic approaches need to be implemented to collect these data. The study also concludes that changes in project scope may have the greatest impact on project costs. Such changes must therefore be identified immediately and incorporated into the estimate. Finally, the report notes that more needs to be done to facilitate the comparison of estimates, for example by providing a reporting template for national estimates. (authors)
In accordance with federal legislation, the U.S. Department of Energy (DOE) has conducted a project to demonstrate use of its Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High-Rise Residential Buildings; Mandatory for New Federal Buildings; Interim Rule (referred to in this report as DOE-1993). A key requisite of the legislation requires DOE to develop commercial building energy standards that are cost effective. During the demonstration project, DOE specifically addressed this issue by assessing the impacts of the standards on (1) construction costs, (2) builders (and especially small builders) of multi-family, high-rise buildings, and (3) the ability of low-to moderate-income persons to purchase or rent units in such buildings. This document reports on this project.
A large number of proven technical solutions exists for the use of renewable energies. However, their dissemination is still too slow to meet the political goal of substituting for 8-15% of the primary energy demand in the European Union by the year 2010. Even renewable energy systems (RES) with an economic potential are only partly exploited. The FIRE research project financed partly in the JOULE program analyses and compares the means of financing RES in Austria, Denmark, Germany, the Netherlands, Spain, Sweden and the United Kingdom to put forward best practice recommendations so that renewable energy depolyments will occur at a faster rate. FIRE addresses to politicians, to potential investors and to project-developers. (orig./RHM)
The U.S. Department of Energy (DOE) Office of Pollution Prevention (EM-77) created is successful internally competed program to fund innovative projects based on projected returns. This is called the Return-on-Investment (ROI) program. EM-77 conducted a successful ROI pilot, developed and implemented sound management practices, and successfully transferred the program to several Operations Offices. Over the past 4 years sites have completed 262 ROI projects (costing $18.8 million) with claimed first-year savings of $88 million and claimed life cycle savings exceeding $300 million. EM-77 requested that Oak Ridge National Laboratory perform an independent evaluation of the site-led, DOE-HQ-funded pollution prevention (P2) ROI program to assist the Department in determining whether claimed savings are real.
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
Purpose - The purpose of this paper is to encourage other libraries to provide access to their own original content via the web. By way of case study, the process of identifying materials, scanning them and creating web access to original content will be explored. Design/methodology/approach - To implement a book digitization project, three major things need to be present. The library must own material that was published prior to 1923, making them safely out of copyright in the USA; the library needs access to server space on the web and the library needs to own scanning equipment. Findings - This project demonstrated that a library does not necessarily need to obtain grant funding to begin an effective and successful digitization program. It also revealed a few things that would improve t...
This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.