Acceptance test report for the Westinghouse 100 ton hydraulic trailer  

Energy Technology Data Exchange (ETDEWEB)

The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

1995-03-06

2

Preliminary investigation of the magnetostratigraphy of the Ringold Formation  

International Nuclear Information System (INIS)

The Ringold Formation consists of lacustrine and fluvial deposits overlying the Columbia River Basalt. The Ringold Formation, because of its thickness, extent, and age, is an excellent unit in which to detect and possibly data the deformation that has occurred since deposition of the basalt. One objective of this study was to investigate the paleomagnetism of the upper Ringold unit exposed at one location in the White Bluffs in enough detail to resolve, with reasonable confidence, the magnetostratigraphy of the rock units sampled. The other objective was to evaluate, in a preliminary manner, the paleomagnetic favorability and magnetostratigraphy of the subsurface Ringold Formation in the Pasco Basin and at selected exposures outside the Pasco Basin. The scope of this study was the collection of 300 paleomagnetic samples, their measurement, and analysis. Samples were collected from the White Bluffs, from core recovered from six drill holes on ...

3

FFTF report: FFTF piping installation and welding techniques  

International Nuclear Information System (INIS)

The main sodium piping with a diameter of 16'' or 28 '' is being installed at the FFTF construction site starting in December 1974. The supplier and authority demarcations are: Combustion Engineering supplies the reactor vessel, guard vessel and adjoining pipes and uses the machine welding equipment ''Dimetrics''; for the piping system of the primary and secondary loops the pipes manufactured by Rollmet at HUICO, Pasco, were delivered and prefabricated there, as far as compatible with the installation. ''Astroarc'' welding machines are used by Bechtel for the piping prefabrication in the weld laboratory as well as on site at the construction site. Technical welding problems occurring during the course of the installation at the construction site and several during this time are described. At present 6 weld seams in the reactor and 14 weld seams in the secondary loop are accepted. The requirement exists to carry out as many welds as possible automatically, in order ...