The reinforced concrete artificial iced course, constructed first in Japan as a bobsleigh and luge track for the Nagano Olympic Games, has a total extension of 1,700 m and an altitude difference of 113 m. It contains 15 curves and 2 up-grades and is divided into 43 blocks with spans ranging from 20 m to 80 m, all of which consist of lightwall RC members supported by pile foundations. The surface is cooled to -15 centigrade by the cooling pipes embedded in concrete and is iced by spraying water, and iced surface is shaved to make a course. Since the course scarcely has same profiles, the finished wall thickness is secured by fixing wire gauzes on the required positions without using shutterings. As there is not existed concrete satisfying all the required quality, two kinds of concrete were selected for filling in the arrangement of reinforcement and pipes and for surface finishing. Special notice was taken of the accuracy of finished surface. For the construction ...