...Project objectives to restore/create network of secure lapwing breeding sites to provide conservation management advice to planners, developers and land managers to raise awareness of lapwing conservation issues in the local areaKey dates so far First pair of lapwing breeding at Parc Bryn Bach, mitigation site for loss of a nearby large lapwing breeding colony, in May 2008Work planned or underway Continued working with developers and landowners to ...
Energy Technology Data Exchange (ETDEWEB)
The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. In this quarterly report, we present a preliminary comparison of the carbon sequestration potential of forests growing on 14 mined sites in a seven-state region in the Midwestern and Eastern Coalfields. Carbon contents of these forests were compared to adjacent forests on non-mined land. The study was installed as a 3 x 3 factorial in a random complete block design with three replications at each location. The treatments include three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots requires 4.5 acres, and the ...
2004-06-04
The vital importance of GIS : a workshop in project siting and development
Energy Technology Data Exchange (ETDEWEB)
Geographic information system (GIS) technology is now being used by wind energy developers who are required to consider and accommodate a wide variety of environmental and social considerations. This poster presentation discussed some of the new features available in current GIS technologies. High resolution imagery from satellites is being used to verify the accuracy of collected spatial data, as well as to investigate potential locations for meteorological towers, turbine sites, and roads. Slopes are easily calculated using GIS software tools, and digital elevation data can be used with high resolution aerial photography to determine routes for new roads and to establish available sites for crane pads. The GIS tools allow developers to consider protected ecological areas, wetlands and forests, and gives them the ability to better report project development considerations at public consultations. Wind resource grid outputs can also be projected using GIS software. The ability to ...
2010-07-01
Proceedings of CanWEA's 2006 conference and trade show
International Nuclear Information System (INIS)
The Canadian wind energy industry is experiencing rapid and unprecedented growth. The year 2006 saw the installation of 534 MW of wind energy across Canada, representing approximately $1 billion in new investment. It is anticipated that the wind energy industry will help to create jobs and training opportunities for many Canadians, as well as provide ongoing economic benefits to local communities through municipal tax and land lease payments. However, many challenges remain if Canada is to meet, or exceed, its objective of a total of 10,000 MW in installed wind energy by 2015. This conference provided a forum for wind industry member, academics and representatives of both governmental and non-governmental agencies to discuss issues related to wind energy development. The conference was divided into 3 streams. The policy stream examined issues related to the Canadian Wind Power Production Incentive (WPPI) program, as well as various federal policies regarding environmental assessments ...
2006-10-22
Energy Technology Data Exchange (ETDEWEB)
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and ...
2003-11-01
Website Policies and Important Links Comments
WorldWideScience.org is maintained by the U.S. Department of Energy's
Office of Scientific and Technical Information as the Operating Agent
for the WorldWideScience Alliance.