Development Application - Terra Nova Development - Supplement B to the Application  

Energy Technology Data Exchange (ETDEWEB)

Supplement B to the Terra Nova Development Application provides a description of the floating production storage and offloading (FPSO) vessel system selected for the development, a summary of the reasons for selecting the system, and the impact of this selection on the Development Plan, the Benefits Plan, the Environmental Impact Statement and the Socio-Economic Impact Statement. There is also a description of the contractor alliance approach to be used in the Terra Nova Development. Refs., tabs., figs.

1997-02-01

2

The Terra Nova oil field development  

Energy Technology Data Exchange (ETDEWEB)

Before expanding on the development of the Terra Nova oilfield, the author discussed the overall business strategy of Petro-Canada and identified where the Terra Nova and offshore Newfoundland oil have their place within this strategy. The principal basins and oilfields offshore Newfoundland were reviewed, then the emphasis shifted to rest on the Terra Nova development project. A whole range of topics were brought up, including the Floating Production, Storage and Offloading (FPSO) facility, the modules layout, the FPSO located at Bull Arm, and the floating production systems. The physical environment of the Grand Banks was highlighted, and the next few sections were devoted to the Terra Nova FPSO, FPSO and drill centres, the Turret General Arrangement, and Spider buoy including the disconnect/reconnect. The last four sections dealt with the animation of riser movement, the wellhead protection ...

2001-07-01

3

DECEMBER 2002 Paul Menzel - MODIS - NASA  

Science.gov (United States)

A comparison of MODIS Terra regression-based surface skin temperature with that measured by the infrared thermometer (IRT) at the SGP ARM-CART ...

4

NASA Surfs the Skies Above Oahu, Hawaii  

National Aeronautics and Space Administration (NASA)

This flyover of the Hawaiian island of Oahu was made by draping Jan. 13, 2010, image data from the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) instrument on NASA's Terra spacecraft over new ASTER Version 2 digital elevation data.

2011-10-17

5

A-Train 2010 Abstract Submissions - NASA  

Science.gov (United States)

particle mass with diameter smaller than 2.5 microns.) Our expectation has been that California's ...... MODIS Aqua and Terra products to visualize the movement of ...... correlation in hydrometeor (cloud and precipitation) occurrence, ...

6

Terra Nova tow-out poised as next East Coast event  

Energy Technology Data Exchange (ETDEWEB)

This spring, Newfoundland will send off a floating production, storage and offloading (FPSO) vessel to the offshore Terra Nova field. The Terra Nova will proceed southeast through Bull Arm, then northeast out of Trinity Bay, then heads southeast to the Jeanne d'Arc Basin on the Grand Banks. The Terra Nova is expected to produce 115,000 barrels of oil per day for six years, when it reaches full capacity. The consortium, headed by Petro-Canada as senior ownership partner and operator, built an environment protection program into every aspect of the project. Some of the features of the environment protection program include glory holes excavated on the ocean floor for the protection of production equipment from icebergs, to a flare stack on the platform, which has four legs to provide stability in rough seas. The FPSO was designed to withstand sea ice, icebergs, and severe winter storms. Flow lines are also protected, ...

2001-01-15

7

All aboard: Terra Nova 'not for the faint hearted'  

Energy Technology Data Exchange (ETDEWEB)

The state of exploration in the Terra Nova field offshore Newfoundland, and the progress in constructing the floating production, storage and offloading (FPSO) at Bull Arm, the assembly site west of St. John's for the Terra Nova vessel, are described. Comparisons are made between the excitement created by the first production well at Leduc in Western Canada in 1947, and the offshore developments currently underway and accelerating offshore Newfoundland. It is estimated that exploration and development offshore had barely touched the surface, with only 160 wells of all types drilled to date, of which 48 exploration wells have uncovered 1.7 billion barrels of oil. The area is practically unexplored; the source rock is there, and the current estimate is that there are a number of basins in the offshore area that are several times the size of the Jeanne d'Arc Basin, where the Hibernia field is currently producing about 135,000 ...

2001-08-06

8

Terra Nova FPSO on the Grand Banks of Canada  

Energy Technology Data Exchange (ETDEWEB)

An increased use of floating production facilities for offshore oil production in the past fifteen years was due in part to advances in technology, the opening of new frontiers and the increased emphasis on value driven development. Throughout the world, a total of 121 floating production systems were in operation in February 2001, and orders had been placed for an additional 27. Located near the nose of the Grand Banks, approximately 350 kilometres east-southeast of St. John's, Newfoundland is the Terra Nova development. Twelve years elapsed between the discovery of the field in 1984 and the granting of the approval for development in 1996. The decision was made to use a floating production system as the Terra Nova was not considered robust enough to support a gravity base, ice resistant structure development concept, especially considering that it came on the heels of the Hibernia development. The first Floating Production, Storage ...

2001-07-01

9

Terra Nova: taming the North Atlantic  

Energy Technology Data Exchange (ETDEWEB)

The Terra Nova offshore oil project is described, with emphasis on the construction of the Terra Nova Floating Production Storage and Offloading (FPSO) vessel, the first such vessel constructed for the harsh environment of the North Atlantic off Newfoundland, the site of an oil field that is expected to produce 125,000 to 150,000 barrels of oil per day starting in 2001. The vessel has a double-hull, made of 3,000 tons of reinforced steel to protect it from ice in the form of massive icebergs or crusty 'packs'. The vessel has the world's largest quick release turret, meaning that the vessel can be quickly disconnected from its turret and mooring in the event of an encroaching iceberg, and then reconnected in an environmentally sound way. Apart from its extremely rugged construction, protecting the FPSO vessel against icebergs is accomplished by way of 'hosing down' (by melting by powerful streams of ...

2000-08-01

10

Terra Nova 2006 turnaround  

Energy Technology Data Exchange (ETDEWEB)

Petro-Canada's Terra Nova offshore oil platform was designed with the expectation that its Floating, Production, Storage and Offloading (FPSO) vessel would be taken off location for maintenance and modifications work within the first 10 years of operation. Petro-Canada's 2006 extended Turnaround project was initiated to prepare for the maintenance and transport of the FPSO. The project aimed to execute an extended turnaround in approximately 90 days. The cost of the project was estimated at $190.5 million. Shutdown occurred early on May 7, 2006 due to the failure of a generator gearbox. Staff were increased from 80 to 120 to complete critical preparation work. On June 17, the FPSO was disconnected and departed for Conception Bay. A turret cover plate was installed, and the FPSO began its voyage to a Rotterdam shipyard in the Netherlands. In order to complete the journey, a comprehensive marine transit manual and emergency response plan was needed. ...

2006-07-01

11

FPSOs assuming key role in harsh environments  

Energy Technology Data Exchange (ETDEWEB)

There are at present 116 floating production systems and 60 storage vessels dotting the oceans involved in hydrocarbon exploration and production activities. Although concentrated mostly in the North Sea, they can be found also off the coast of Australia, eastern Canada, Brazil, some African nations and the Gulf of Mexico. They range from converted tankers to purpose built rigs. The most adaptable of the various systems is the floating production, storage and offloading (FPSO) vessel, first developed as a cost-effective means of developing fields in Brazil's very deep offshore areas. Still being tested and modified for work in widely different environments, FPSOs appear to have met all requirements in producing expenditure efficiencies, maximizing profits, and protecting workers. One of the most efficient and most technically advanced is a 292-metre long FPSO built for the Terra Nova Alliance by Daewoo Shipyards in South Korea. It arrived at ...

2001-01-22

12

Terra Nova Environmental effects monitoring program  

Energy Technology Data Exchange (ETDEWEB)

Elements of the environmental effects monitoring program in the Terra Nova oil field, about 350 km east-southeast of St. John's, Newfoundland, are described. This oilfield is being developed using a floating production storage and offloading (FPSO) facility. A total of 24 wells are expected to be drilled through seven subsea templates located in four glory holes to protect them from icebergs. Subsea installations will be linked to the FPSO by trenched flowlines connected to flexible risers. The FPSO will offload to shuttle tankers. First oil is expected in 2001. The environmental effects monitoring program will be conducted annually for the first two years beginning in 2000. Subsequent scheduling will be determined after a review of monitoring data collected during the first three years. Input to the design of the monitoring program was provided by all stakeholders, i. e. owners, local public, government agencies and regional and international experts. A ...

2000-07-01

13

An assessment of the number of seabirds at risk during the November 2004 Terra Nova FPSO oil spill on the Grand Banks  

Energy Technology Data Exchange (ETDEWEB)

This paper reported on the number of seabirds impacted by the Terra Nova floating production, storage and offloading (FPSO) vessel, which released 160,000 litres of crude oil after it struck the Grand Banks, an area located approximately 340 km east of St. John's, Newfoundland. An area of approximately 340 km{sup 2} was impacted by the spill, which occurred at a time when large numbers of dovekies and murres inhabit the region. After the spill, both vessel-based and helicopter-based surveys were conducted in order to estimate seabird densities in the immediate region. Densities were then compared to other data from similar time periods. The number of birds at risk was estimated base on seabird densities noted from on-vessel surveys. A mean density of 3.46 murres per km{sup 2} and 1.07 dovekies per km{sup 2} were recorded. Mean density increased when birds in flight were also considered. Density estimates were similar to data previously reported. The ...

2006-09-15

14

Ship of challenges: Braced for perfect storms, icebergs and oilfield hazards  

Energy Technology Data Exchange (ETDEWEB)

More details about the construction of the Terra Nova floating production, storage and offloading (FPSO) vessel are provided. The vessel was built in the Daewoo shipyard in South Korea, and is now undergoing final fitting at Bull Arm, near St. John's, Newfoundland. When complete, the vessel will operate 350 km offshore, southeast of St. John's. It is 291 metres long and 45.5 metres wide and has a capacity of 960,000 barrels of oil. Although the FPSO will hold less than half of the last giant supertanker which sailed for Irving Oil, it has a crew of 81, four times the size of the supertanker, reflecting the technical uniqueness of the vessel and the intense pre-occupation with safety associated with the combination of winds, ice, waves, and shallow water around the Grand Banks. Also described is the alliance system of partnership between the oil companies and the main contractors. The deal stipulates that if the project ran over its budget, the oil ...

2001-08-06

15

A decade of petroleum developments  

Energy Technology Data Exchange (ETDEWEB)

Canada's offshore Atlantic petroleum industry is celebrating its tenth anniversary in 2001. This article chronicles the development of the industry discussing the many challenges and setbacks and the eventual triumphs that accompanied the industry's development over the years. Highlights discussed include shipping first oil from the Cohasset Field in July 1992; the financial crisis caused by the withdrawal of Gulf Oil from the Hibernia consortium in the same year; new funding and the beginning of the gravity-based structure construction at Bulls Arm in 1993; striking oil in the Hibernia Field in 1994; the start of exploration and development of the Terra Nova field by Petro-Canada in the same year, based on the floating production, storage and offloading (FPSO) system, which heralded a new era of offshore development in eastern Canada. Approval by the Nova Scotia government of the third and final phase of the Sable Offshore Energy Project followed ...

2001-03-01

16

Getting gas to shore  

Energy Technology Data Exchange (ETDEWEB)

Calls for containers to transport compressed natural gas, and a ship or barge to house some 200 employees in the Terra Nova offshore oilfield while the oil field's floating production, storage and offloading (FPSO) system is undergoing a major overhaul, are attracting attention on Canada's east coast offshore oilpatch. The FPSO is located offshore, 350 km east of St. John's, Newfoundland. Petro-Canada, operators of the FPSO anticipate that by having all required personnel nearby, the total shutdown time for the overhaul could be minimized. The CNG container was designed by Trans Ocean Gas Inc. in response to an invitation by Husky Oil and Petro-Canada, the White Rose field partners. Trans Ocean Gas strongly believes that CNG will become the technology of choice for getting natural gas ashore and to markets from stranded hydrocarbon pools in Atlantic Canada and the rest of the world where pipeline systems would be too expensive to build ...

2004-10-01

17

White Rose oilfield development application. CD-ROM ed.  

Energy Technology Data Exchange (ETDEWEB)

Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 cubic meters (850,000 ...

2001-01-01

18

Aerosol Properties Over the United Arab Emirates and Arabian Gulf from MISR Multi-angle Satellite Imaging  

Science.gov (United States)

The MISR instrument aboard NASA's Terra satellite participated in the UAE-2 campaign, August-October 2004. This campaign represented a unique opportunity to study the complex aerosol situation in the Arabian Gulf region, in the context of a first-rate collection of aircraft and surface-based instruments, giving us the opportunity to do some groundbreaking satellite aerosol validation work. We aimed (1) to validate MISR aerosol retrieval results for dust and pollution particles over dark and light surfaces, and (2) to contribute regional maps of aerosol optical thickness (AOT) and particle micro-physical properties, giving spatial context to the field-instrument measurements, and moving toward a satellite-based regional aerosol climatology. The validation effort benefited from the combination of an instrumented aircraft and a regional network of surface-based sun photometers. We obtained high-quality sub-orbital data coincident with MISR overpasses on three days: ...

2005-12-01